ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
perator leld(s) Month/Year of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 01/2002
GATHERING CENTER 3
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 7,822
4. Flared or vented greater than 1 hour 8,937
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 21,680
6. Used for lease operations Fuel 607,281
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 645,720
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 29,003,032
Remarks:
I hereby C~h(tgOing i~ and B:ect to thffest of my knowledge.
Signature: , A R.. A7\ 1) ~ Title: SUPERVISOR
Form 1 0-422 Revis~ 4/95 ..,
*Indicate contribution of each pool to total.
Pool Name
Code
Percent
PRUDHOE
640150
100.00%
1. Safety
MCF
2. Lease Use
(13 J-
MCF
3. Conserv. Purposes
MCF
G.~t,{' ~
Commissi. r
:sf I'¡-(PZ.
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
JANUARY, 2002
Page 1
Iunplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTIONOFiINCIDENT&CAUSE
1/4/2002 2125-2130 21 Not required for unplanned events which
1/9/2002 2334-2338 125 are less than or equal to 1 hour
1/10/2002 1353-1357 56
1/10/2002 1542-1547 52
1/11/2002 0522-0526 42
1/11/2002 2211-2216 52
1/15/2002 0503-0554 642 Intermittent
1/15/2002 2234-2313 813
1/16/2002 0436-0525 242 Intermittent
1/16/2002 1132-1200 1,944
1/25/2002 0426-0442 167 Intermittent
1/25/2002 1042-1048 125
1/26/2002 0709-0717 63 Intermittent
1/27/2002 1306-1325 330
1/28/2002 1007-1040 597
1/28/2002 1549-1628 1,788
1/29/2002 0201-0238 308
1/30/2002 0718-0745 281
1/30/2002 2209-2214 174
TOTAL
7,822
tunplanned Events greater than 1 hour
DATE TIME
1/23/2002 0952-1100
1/27/2002 1536-1715
TOTAL
VOLUME DESCRIPTION OF INCIDENT & CAUSE
7,697 See Attachments
1,240 Intermittent
8,937
tPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL 0
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
Iplanned Events Exceedin~ 1 Hour OR ExceedinQ 5000 Mct
DATE TIME 'VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL 0
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour & not
exceeding 5,000 MCF
Planned Events> 1 hour and
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL
7,822
8,937
o
o
TOTAL FLARED VOLUME
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
REPORT NO: 02-0035
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 23 Jan 2002
SYSTEM
TIME OF FLARING
Start Stop Duration
09:52 11 :00 1 Hrs 8 Mins
Black
Intermittent Smoke
o 0
Planned VOLUME
o 7,697 MSCF
1. Flare/Relief Valve
TOTAL VOLUME 7,697 MSCF
First Determination of Cause: j
1. High gas transit line pressure caused by CGF compressor problems due to shut down of Boosters
1801, 1802 and 1857.
Action Taken to Stop Flaring:
1. WOA reduced production rates and shut-in wells equaling 1,141 mmscfd. EOA reduced production
rates and shut-in wells equaling 1,000 mmscfd. Wells were shut-in or choked back starting at 09:52
hours.
Monday, January 28, 2002
Page 1 of 1
REPORT NO: 02-0054
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 27 Jan 2002
SYSTEM
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
13:06 13:25 OHrs 19 Mins 0 0 0 330 MSCF
15:36 17:15 1 Hrs 25 Mins ~ 0 0 1,240 MSCF
TOTAL VOLUME 1,570 MSCF
1. Flare/Relief Valve
2. Flare/Relief Valve
First Determination of Cause:
1. High gas transit line pressure caused by CGF compressor switching.
j
2. High gas transit line pressure caused by CGF 1876 tandam compressor shutdown for scheduled
maintenance.
Action Taken to Stop Flaring:
1. WOA reduced production rates equaling 20 mmscfd. EOA reduced production rates equaling 30
mmscfd. Wells were shut-in or choked back starting at 1300 hours.
2. WOA reduced production rates equaling 60 mmscfd. EOA reduced production rates equaling 110
mmscfd. Wells were shut-in or choked back starting at 1540 hours.
Monday, January 28,2002
Page 1 of 1
GPB Flaring incident
Subject: GPB Flaring incident
Date: Sat, 26 Jan 2002 00:00:31 -0600
From: "Bolkovatz, Mike J" <BolkovMJ@BP.com>
To: "Steve McMains (E-mail)..<steve_mcmains@admin.state.ak.us>
CC: "Fiedler, Anne M" <FiedleAM@BP.com>, "Benson, Gary A" <BensonGA@BP.com>,
"Pfeiffer, Jim A" <PfeiffJA@BP.com>,
"GPB, Environ Advisor East" <GPBEnvironAdvisorEast@BP.com>
To:
Steve McMains, AOGCC
steve mcmains@admin.state.ak.us
907-793-1241, fax 907-276-7542
From:
Michael Bolkovatz, GPB Prod Optim Team Leader, 907-659-5566
This note is to inform you of a flaring incident which occurred on January
23, 2002. At 09:52, GC3 started flaring
because CGF booster compressors 1801, 1802, and 1857 shutdown. At 09:56, the
flare relief valve at GC1 opened.
Booster 1802 shutdown due to an exhaust gas temperature problem. Then,
booster 1801 shutdown because of
vibration problems when 1802 shutdown. Then, booster 1857 shutdown because
of a fuel control problem. The
WOA immediately started reducing productionrates and shutin 1141 MMSCF. The
EOA immediately started
reducing production and shut in 1000 MMSCF. This gas cut was enough to lower
the gas transit header pressure
to stop flaring. GCltlared a total of 6,433 MSCF for 59 minutes, and GC3
flared a total of 7,697 MSCF for 1 hr,
8 minutes. Due to the significant amount of production (approximately 60
wells) that had to be shut in in order to
reduce the pressure enough to close the flare relief valve, the flaring
event at GC3 lasted over 1 hr. Because of the
gas piping hydraulics, the pressure at GCl was reduced sooner and they were
able to stop flaring in just under 1 hr.
Please don't hesitate to call me with any questions.
Michael Bolkovatz
GPB Production Optimization TL
659-5566
1 of 1
1/26/028:33 AM
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION! ALASKA WESTERN OPERATING AREA-PBU 02/2002
GATHERING CENTER 3
Disposition Volume MCF-
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 9,226
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 15,068
6. Used for lease operations Fuel 531,413
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 555,707
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 25,919,373
Remarks:
I hereby ceV:Ö ~tegOing jiÖ true and correct to the best of my knowledge.
Signature: ". .Å """ II Title: SUPERVISOR
Form 1 0-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
FEBRUARY, 2002
IUnplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
2/1/2002 1320-1358 1,056 Not required for unplanned events which
2/1/2002 1419-1445 813 are less than or equal to 1 hour
2/1/2002 1639-1651 208
2/3/2002 1416-1425 156
2/4/2002 1103-1201 4,028
2/4/2002 2106-2132 632
2/14/2002 1823-1827 33
2/15/2002 1220-1300 1,389
2/16/2002 2336-2342 63
2/17/2002 0151-0159 89
2/23/2002 0607-0618 76
2/23/2002 1359-1407 56
2/25/2002 1325-1342 106
2/26/2002 1029-1039 69
2/26/2002 1122-1134 83
2/26/2002 1502-1522 15 Intermittent
2/27/2002 2312-2317 104
2/28/2002 0034-0046 250
Page 1
TOTAL
9,226
~Unplanned Events greater than 1 hour
DATE TIME VOLUME
DESCRIPTION OF INCIDENT & CAUSE
See Attachments
Intermittent
o
TOTAL
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
~Planned Events Less Than or Equal 1 Hour AND Not Exceedin9 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL 0
~Planned Events Exceedin9 1 Hour OR Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL 0
ACTION TAKEN TO ELlMIIIIATE CAUSE
See Attachments
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
o
o
o
24,294
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
PHILLIPS
W
PHILLIPS Alaska, Inc.
A Subsidiary of PHILLIPS PETROLEUM COMPANY
Post Office Box 100360
Anchorage AK 99510-0360
Telephone 907-276-1215
March 19, 2002
TO: Recipients of the Alpine Participating Area Monthly Production
Report of Gas Disposition
Enclosed is the Produced Gas Disposition Report for February 2002.
Please address any questions to Irina Manelick at (907) 263-4607.
Sincerely,
~~
~~pson, Supervisor
Production & Revenue Accounting
GS/jf
Ol/alp
Enclosures
RECEIVED
MAR 2 0 2007
Alaska Oil & Gas Cons. Commission
Anchorage
COLVILLE RIVER UNIT PRODUCERS REPORT
OF GAS DISPOSITION
ALASKA On.. & GAS CONS. COMM.
Attn: Mr. Steve McMains
333 W. 7th Avenue, Suite 100
Anchorage, AK 99501
ARCTIC SLOPE REGIONAL CORPORATION
Attn: Ms. Teresa Imm
301 Arctic Slope A venue, Suite 300
Anchorage, AK 99518-3035
ANADARKO PETROLEUM CORPORATION
Attn: Ms. Catherine Lively
P.O. Box 1330
Houston, TX 77251-1330
C. L. Crabtree
Donnelly & Manson
S. R. Edwards
M. D. Erwin
I. Manelick
A TO 848
NSK 25
ATO 1666
A TO 810
ATO 1658
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 03/2002
GATHERING CENTER 3
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 3,628
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 17,528
6. Used for lease operations Fuel 582,689
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 603,845
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 28,969,163
Remarks:
I hereby ceVr\th/tregoing i~»ue and correct to the best of my knowledge.
Signature: ~ . ..Å...f iVVI .. . OJ Title: SUPERVISOR
Form 10-422 (Revised 4/95)
'Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
MARCH, 2002
~Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
3/1/2002 1005-1011 117 Not required for unplanned events which
3/1/2002 1323-1330 73 are less than or equal to 1 hour
3/1/2002 1705-1720 604
3/8/2002 0519-0529 125
3/8/2002 0636-0641 139
3/9/2002 0935-0940 104
3/11/2002 1130-1135 52
3/11/2002 1338-1344 167
3/13/2002 2343-2359 111
3/14/2002 0001-0013 83
3/16/2002 1625-1640 135
3/17/2002 0339-0345 42
3/17/2002 0714-0728 97
3/17/2002 1354-1421 263
3/18/2002 1249-1325 225
3/19/2002 1059-1221 188 Intermittent
3/19/2002 1807-1810 10
3/20/2002 1328-1340 83
3/21/2002 1547-1557 111
3/21/2002 1639-1644 38
3/30/2002 0140-0211 861
Page 1
TOTAL
3,628
~Unplanned Events greater than 1 hour
DATE TIME VOLUME
DES(;RIP'tIONOF INCIDENT·& CAUSE
See Attachments
o
TOTAL
~Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL 0
Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Met
DATE TIME VOLuME DESCRIPTIONOFJNCIDENT & CAUSE
See Attachments
TOTAL 0
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL
3,628
o
o
o
TOTAL FLARED VOLUME
21,156
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
Facility
GATHERING CENTER 3
Disposition
1. Sold
2. Reinjected
3. Flared or vented less than 1 hour.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 04/2002
Fuel
Assist
Volume MCF"
0
0
6,299
188 v
21 739
506,088
0
0
534,314
0
0
0
27,196,747
4. Flared or vented greater than 1 hour
(Supplemental re ort required - See 20 AAC 25.235)
5. Pilot and Purge
6. Used for lease operations
7. Other
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to: CCP
Remarks:
TOTAL items 1 - 7
Signature:
Form 10-422 (Revised 4/95)
Lift Gas, Off Field
and correct to the best of my knowledge.
Title: SUPERVISOR
"Indicate contribution of each pool to total.
Pool Name
Code
Percent
PRUDHOE
640150
100.00%
1. Safety ISg MCF <T~
2. Lease Use MCF
3. Conserv. Purposes MCF
~~'~ (plloto ~
Commis~ner Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
April 2002
~~nplanned Events less than or equal to 1 hour
:'[)~:rISi·· .. .............. ····:rJI\í1E)) . . ............ . .............. :V.OLUMISi ·[)t:S§~FJI~:rIQN:ºF'N~!DI:N:r8ECAu§E
4/1/2002 0017-0025 222 Not required for unplanned events which
4/4/2002 1254-1306 292 are less than or equal to 1 hour
4/4/2002 2320-2335 125
4/7/2002 2054-2058 50
4/7/2002 2309-2400 885
4/8/2002 0000-0005 35
4/8/2002 0147-0229 1 ,458
4/8/2002 0447-0512 115
4/8/2002 0907-0919 333
4/13/2002 0438-0456 313
4/13/2002 1 015-1049 236
4/14/2002 1547-1553 208
4/17/2002 0529-0534 17
4/17/2002 2234-2304 208
4/18/2002 0318-0352 165
4/18/2002 0422-0435 90
4/18/2002 0918-0927 25
4/18/2002 0941-0956 42
4/20/2002 1718-1727 19
4/21/2002 0826-0834 83
4/23/2002 1035-1044 75
4/23/2002 2324-2332 83
4/24/2002 0616-0624 22
4/24/2002 1718-1438 417
4/25/2002 1056-1119 479
4/26/2002 1533-1540 24
4/28/2002 1034-1054 278
Page 1
TOTAL
6,299
tunplanned Events greater than 1 hour
DATE . . . . TIME . .. VOLUME· DESCRIPTION OF INCIDENT & CAUSE
4/21/2002 2236-2355 188 See Attachments
TOTAL
188
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
I
. ACTION TAKEN TO ELIMINATE CAUSE .
Not required for unplanned events which
are less than or equal to 1 hour
. ACTION TAKEN TO ELIMINATE CAUSE .
See Attachments
BP EXPLORATION (ALASKA) INC.
PRUDHOE SAY UNIT - GC·3
GAS FLARING INCIDENT REPORT
April 2002
Page 2
See Attachments
See Attachments
TOTAL
o
Iplanned Events Exceedin~ 1 Hour OR Exceeding 5000 Mcf
DATE· TIME· . . VOLUME D.ESCRIPTlONOF INCIDENT ~ CAI,ISE
See Attachments
...... ACTION TAKEN TO.ELlI'.!J'NATE CAUSE· .
See Attachments
I
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
188
o
o
TOTAL FLARED VOLUME
28,226
bp
REPORT NO: 02-0243
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3 DATE: 21 Apr 2002
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve OHrs OMins 0 0 0 o MSCF
2. Flare/Relief Valve 08:26 08:34 OHrs 8Mins 0 0 0 83 MSCF
3. Flare/Relief Valve 22:36 23:55 1 Hrs 19 Mins 0 0 0 188 MSCF
TOTAL VOLUME 271 MSCF
First Determination of Cause:
1. High gas transit line pressure caused by CCP compressor problems due to Compressor 1878
switching to LPS 1 & 2.
2. High gas transit line pressure caused by CCP compressor problems due to compressor 1878
switching to LPS.
Action Taken to Stop Flaring:
1. WOA reduced production rates and shut-in 18 wells equaling 228 mmscfd. EOA reduced production
rates and shut-in 8 wells equaling 180 mmscfd. Wells were shut-in or choked back starting at 0826
hours.
2. WOA stopped bringing production rates up until wells unloaded and flaring was ceased. WOA also
cut 4 wells equaling 55 mmcf/d.
Tuesday,Apnl30,2002
Page 1 of 1
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Vear of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU OS/2002
GATHERING CENTER 3
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 5,689
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 21,452
6. Used for lease operations Fuel 528,697
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 555,838
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 27,640,477
Remarks:
I hereby certfi that th~ and correct to the best of my knowledge.
Signature: .0. . Title: SUPERVISOR
Form 10-422 (Revised 4/95)
-Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT· GC-3
GAS FLARING INCIDENT REPORT
May 2002
Page 1
lunplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT)&)CAUSE
5/8/2002 0325-0405 750 Not required for unplanned events which
5/9/2002 0301-0314 190 are less than or equal to 1 hour
5/9/2002 1128-1202 354
5/11/2002 1531-1602 323
5/13/2002 1752-1816 200
5/13/2002 1931-1936 28
5/14/2002 1605-1641 250
5/16/2002 0629-0636 63
5/16/2002 0714-0737 176
5/16/2002 1229-1313 336
5/16/2002 1422-1509 365
5/16/2002 1534-1540 50
5/16/2002 1802-1814 250
5/17/2002 0726-0736 90
5/17/2002 1018-1030 100
5/18/2002 0728-0741 117
5/18/2002 1143-1155 92
5/18/2002 1158-1222 183
5/18/2002 1229-1236 58
5/20/2002 1548-1552 44
5/24/2002 0849-0911 122
5/24/2002 0923-0934 61
5/28/2002 1533-1539 33
5/29/2002 0115-0126 69
5/29/2002 1736-1833 1,385
TOTAL
5,689
~unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OFJNCIDENT& CAUSE
See Attachments
TOTAL
o
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTIONOFINCIDENT & CAUSE
See Attachments
TOTAL
o
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to' 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
6/6/2002
1:04 PM
SP EXPLORATION (ALASKA) INC.
PRUDHOE SAY UNIT· GC-3
GAS FLARING INCIDENT REPORT
May 2002
Page 2
Planned Events Exceedin 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments '
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
TOTAL
5,689
o
o
o
27,141
6/6/2002
1:04 PM
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 06/2002
GATHERING CENTER 3
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 1,291
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 18,105
6. Used for lease operations Fuel 512,793
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 532,189
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 25,604,836
Remarks:
I hereby ce~y thaKhe foregoing is true and correct to the best of my knowledge.
Signature: f). Â.A /VVI) h Title: SUPERVISOR
Form 10-422 (Revised 4/95)
-Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT· GC·3
GAS FLARING INCIDENT REPORT
June 2002
Page 1
'Unplanned Events less than or equal to 1 hour
pATEr· ... . ... . . .... . ·f!'IIIo1Ei ..... .... .... YOLUMEDESPfUP1'\qNºFINPIDENI8<CAUSE
6/2/2002 1651-1658 97 Not required for unplanned events which
61812002 0257-0301 28 are less than or equal to 1 hour
6/14/2002 1128-1135 73
6/15/2002 1058-1126 292
6/15/2002 1544-1606 183
6/20/2002 0403-0412 56
6/21/2002 1829-1947 228 Intermittent
6/25/2002 0337-0347 63
6/29/2002 1947-1954 73
6/30/2002 1356-1405 125
6/30/2002 1632-1639 73
TOTAL
1,291
tunplanned Events greater than 1 hour
DATE TIME· VOLUME DESCRIPTION OF INCIDENT 8< CAUSE .
See Attachments
TOTAL
o
~Planned Events Less Than or Equal 1 Hour AND Not Exceedin!) 5000 Met
DATE ... . . ·TIME . . VOLUME.· . DESCRIPTIONO¡: INCIDENT & CAUSE
See Attachments
TOTAL
o
~Planned Events Exceeding 1 Hour OR Exceeding 5000 Met
DATE . lIME VOLUME DESCRIPTION OF INCIDI:NT & CAUSE . .
See Attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5.000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
o
o
o
19,396
. ACTION TAKENIO ELIMINATE CAUSE . ..
Not required for unplanned events which
are less than or equal to 1 hour
. ACTION TAKEN TO ELIMINATE CAUSE·
See Attachments
ACTION. TAKEN. 10 ELIMINATE CAUSE
See Attachments
. ACTION TAKEN 10.ELlMINATECAUSE
See Attachments
7/9/2002
10:54 AM
GATHERING CENTER 3
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 07/2002
Facility
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 6,186
4. Flared or vented greater than 1 hour 1,274
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 18,130
6. Used for lease operations Fuel 410,625
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 436,215
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 21,239,812
Remarks:
I hereby cert{) ~h~trtregOing i,~rue and correct to the best of my knowledge.
Signature: . . .1 J A AA '1, Title: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety 1,'2-14
2. Lease Use MCF
3. Conserv. Purposes MCF
~.~~ ct~c ~
Commis . ner 6 Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 MC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
July 2002
Page 1
JunPlanned Events less than or equal to 1 hour
P'A11;£, .. ...... . TIME' ..... VOCU.ME7~ES.~al~;rIºIiI:¡º~!I~~IJ.)E~T'¿~Xi;Ä"'$1;
7/1/2002 2338-2343 35 Not required for unplanned events which
7/2/2002 1207-1302 542 are less than or equal to 1 hour
7/4/2002 2155-2209 243
717/2002 1039-1046 97
7/10/2002 1112-1125 135
7/12/2002 1510-1547 514
7/12/2002 1609-1613 42
7/12/2002 1705-1715 104
7/14/2002 0210-0229 66
7/14/2002 1647-1742 191
7/15/2002 1727-1749 104
7/15/2002 0818-0852 94
7/24/2002 0006-0041 2,431
7/24/2002 1711-1750 813
7/25/2002 0023-0054 775
TOTAL
6,186
7/16/2002
7/31/2002
1430-1620
1242-1624
TOTAL
300
554
1,274
. ACTION TAKEN TO EUMJNATE CAU$E. ....
Not required for unplanned events which
are less than or equal to 1 hour
~Planned Events Less Than or Equal 1 Hour AND Not Exceedin~ 5000 Mct
DATE TIME VOLUME . DESCRIPTIONOf>INCIDENT & CAUSE
See Attachments
TOTAL
o
ACTION T AKE~ TC) ELIMINATE CAt;1§E' .
See Attachments
~Planned Events Exceeding 1 Hour OR Exceeding 5000 Mct
··DATE . . TIME .. VOCUME DESCRI>TlON OPINCIDENT & CAUSE
See Attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
1,274
o
o
TOTAL FLARED VOLUME
25,590
ACTION TAKE~ TOECIMINATE CÄU§E¿ . ,) .
See Attachments
8/1212002
2:44 PM
bp
REPORT NO: 02-0450
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 16 Jul2002
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
06:50 09:30 2 Hrs l(9-Mins ~ 0 0 420 MSCF
14:30 16:20 I!Hrs ~Mins ~ 0 0 300 MSCF
( So 720 MSCF
TOTAL VOLUME
First Determination of Cause:
1. Intermittent LPS flaring from A-slugcatcher due to high outlet line pressure and high gas transit line
pressure
2. Intermittent LPS flaring from A-slugcatcher during restart of LPS compressor K-7000 after
maintenance
Action Taken to Stop Flaring:
1. WOA reduced production rates equaling 75 mmscfd. Wells were shut-in or choked back starting at
0650 hours.
2. WOA reduced production rates equaling 55 mmscfd. Wells were shut-in or choked back starting at
1430 hours.
Monday, July 22, 2002
Page 1 of 1
REPORT NO: 02-0504
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 31 Jul 2002
SYSTEM
1. Flare/Relief Valve
TIME OF FLARING
Start Stop Duration
12:42 16:24 2 Hrs 20 Mins
Black
Intermittent Smoke
Planned
~ 0
o
VOLUME
554 MSCF
554 MSCF
TOTAL VOLUME
First Determination of Cause:
1. While bringing production rates up following GC shutdown, LPS compressors failed to start up.
Action Taken to Stop Flaring:
1. Flaring was permitted to continue while GC operations personnel attempted to restart the
equipment. Started to cut rate to get out of flare. Looked like compressor was going to start.
Opened rate back up. Compressor didn't make it. Started cutting rate again. Compressor finally on
after turbine tech arrived. Brought rate back up.
Thursday, August 01, 2002
Page 1 of 1
Facility
GATHERING CENTER 3
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
I Operator I Field(s) IMonth/Year of Disposition
I BP EXPLORATION, ALASKA IWESTERN OPERATING AREA-PBU I 08/2002
Disposition
1. Sold
2. Reinjected
3. Flared or vented less than 1 hour.
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge
6. Used for lease operations
7. Other
TOTAL items 1 . 7
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to: CCP
Remarks:
Fuel
Assist
Lift Gas, Off Field
Volume MCF*
0
0
1,260 v
7,692 V~
22,341
494,846
0
0
526,139
0
0
0
25,808,551
I hereby cer¡rty thatphe foregoAng is true and correct to the best of my knowledge.
Signature: ~)() l\....-lA MAV 1. Title: SUPERVISOR
Form 10-422 Revised 4/96)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
'7, ~ q'2- MCF (~ß.u--
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Cil~~~ ~
Commlss ner
~ II
;X ",t!'
,
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT· GC-3
GAS FLARING INCIDENT REPORT
August 2002
~UnPlanned Events less than or equal to 1 hour
DATE . TIME VOLUME OESCRIPTlON<OFINCIOENT&'<<iAUSE
8/2/2002 1203-1208 35 Not required for unplanned events which
8/8/2002 0150-0202 100 are less than or equal to 1 hour
8/23/2002 1 031·1 053 118
8/23/2002 1359-1404 35
8/25/2002 1459-1512 63
8/25/2002 2103-2108 24
8/26/2002 0221-0233 67
8/27/2002 0925-0948 192
8/28/2002 0243-0253 104
8/28/2002 0312-0315 42
8/29/2002 2005-2036 237
8/30/2002 1124-1134 243
1,260 V
TOTAL
ACTION TAKEN TO EUMINA TE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
Junplanned Events greater than 1 hour
PATE TIME VOt:U!ìØEDESCRIPTIONOFINCIDENT&CAUSE
8/9/2002 1516·2400 ~,358 See Attachments
8/10/2002 0000-2359 V'3.498
8/11/2002 0000-1017 /i,503
8/16/2002 1245-1420 /323
TOTAL
7,682 /'
'planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DATE .. TIME .... VOLUME·· . DESCRIPTION OF INCIDENT & CAuSE
See Attachments
TOTAL
o
~Planned Events Exceeding 1 Hour OR Exceeding 5000 Met
DATE . TIME VOLUME. DESCRIPTION OF INCIDENT Iii CA'USE
See Attachments
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL
1,260
7,682
o
TOTAL FLARED VOLUME
o
o
31,283
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
~.
Page 1
~
9/11/2002
3:14PM
REPORT NO: 02-0537
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 09 Aug 2002
SYSTEM
1. Flare/Relief Valve
TIME OF FLARING
Start Stop Duration
15:16 24:00 8 Hrs 44Mins
Black
Intermittent Smoke
o 0
Planned VOLUME
o 2,358 MSCF
TOTAL VOLUME 2,358 MSCF
First Determination of Cause:
1. Low stage compressor K-5500 developed an axial thrust bearing vibration shortly after compressor
cartidrige change-out and plant re-start. Operations personnel determined that this new cartridge
should be changed out and replaced with the old cartidge.
Action Taken to Stop Flaring:
1. GC-3 reduced production rates and shut-in 52 wells equaling 329 mmscfd. Wells were shut-in or
choked back starting at 15:00 hours. Assist gas was added to clean the flare.
VVednesday, August 21, 2002
Page 1 of 1
GPB Flaring Incident
Subject: GPB Flaring Incident
Date: Mon, 12 Aug 2002 19:59:15 -0500
From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com>
To: 'steve_mcmains@admin.state.ak.us'
CC: "Fiedler, Anne M" <FiedleAM@BP.com>, "Benson, Gary A" <BensonGA@BP.com>,
"Pfeiffer, Jim A" <PfeiffJA@BP.com>,
"GPB, Environ Advisor West" <GPBEnvironAdvisorWest@BP.com>
>
>
>
>
>
> 907-659-4472
>
>
> incident at GC3.
>
> On August 9, GC3 low stage compressor K5500
> developed an axial thrust bearing vibration problem. The last time that a
> similar bearing vibration was allowed to continue, the compressor failed
> completely. The decision was made to shutdown the machine to replace the
> compressor cartridge. K5500 was shutdown at 15:16 hrs on 8/9/02. This
> compressor normally processes 4.9 MMSCFPD. When the compressor was
> shutdown, we SI all production from A & X Pads (330 MM/D) and added assist
> gas to the flare to prevent black smoke. This reduction in rate coming
> into the plant reduced the volume that K5500 would normally process to 3.5
> MM/D (K5500 processes the gas left in the oil from the PW tanks, stripping
> gas from TEG regeneration and gas from the condensate collection vessel).
> This was the effective flare rate until K5500 was restarted. K5500 was
> restarted on August 11 at 10:17 hrs. The flarin~~ted for 43
> hrs and 1 minute, and the total volume flared ~_ 7,359 MSCF~
There was a side beñê'riL [yOm --rIÎis incident.
FS3 took their C Train down on 8/9 for cleanout/inspection/repair and they
weren't going to be able to handle the full rate coming from GC3 anyway, so
SI the gas from GC3 minimized the rate that was cut at FS3 for their work.
To:
Steve McMains, AOGCC
steve mcmains@admin.state.ak.us
907-793-1241, fax 907-276-7542
From:
Mike Bolkovatz, GPB Prod Optim Team Leader,
This note is to inform you of an extended flaring
> If you require additional information, please don't
> hesitate to call me.
>
Michael Bolkovatz
GPB Production Optimization TL
659-5566, 659-4472
1 of 1
8/13/2002 8:26 AM
REPORT NO: 02-0543
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 10 Aug 2002
SYSTEM
1. Flare/Relief Valve
TIME OF FLARING
Start Stop Duration
00:00 23:59 24 Hrs 0 Mins
Black
Intermittent Smoke
~ 0
Planned VOLUME
o 3,498 MSCF
TOTAL VOLUME 3,498 MSCF
First Determination of Cause:
1. Low stage compressor K-5500 developed an axial thrust bearing vibration shortly after compressor
cartidrige change-out and plant re-start. Operations personnel determined that this new cartridge
should be changed out and replaced with the old cartidge.
Action Taken to Stop Flaring:
1. GC-3 reduced production rates and shut-in 52 wells equaling 329 mmscfd. Wells were shut-in or
choked back starting at 15:00 hours. Assist gas was added to clean the flare.
VVednesday,August21,2002
Page 1 of 1
REPORT NO: 02-0547
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 11 Aug 2002
SYSTEM
1. Flare/Relief Valve
TIME OF FLARING
Start Stop Duration
00:00 10:17 10Hrs 17Mins
Black
Intermittent Smoke
o 0
Planned VOLUME
o 1,503 MSCF
TOTAL VOLUME 1,503 MSCF
First Determination of Cause:
1. Low stage compressor K-5500 developed an axial thrust bearing vibration shortly after compressor
cartidrige change-out and plant re-start. Operations personnel determined that this new cartridge
should be changed out and replaced with the old cartidge.
Action Taken to Stop Flaring:
1. GC-3 reduced production rates and shut-in 52 wells equaling 329 mmscfd. Wells were shut-in or
choked back starting at 15:00 hours. Assist gas was added to clean the flare. K-5500 was re-started
@ 10:17 hrs and loaded flaring stopped.
Wednesday, August 21,2002
Page 1 of 1
bp
REPORT NO: 02-0556
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 16 Aug 2002
SYSTEM
1. Flare/Relief Valve
TIME OF FLARING
Start Stop Duration
12:45 14:20 1 Hrs 35Mins
Black
Intermittent Smoke
Planned
o 0
o
VOLUME
323 MSCF
323 MSCF
TOTAL VOLUME
First Determination of Cause:
1. Extended flaring event occurred while awaiting GC operator/maintenance evaluation.K-5500
Calibrated Slide Valve.
Action Taken to Stop Flaring:
1. As A-Pad was already SID, no action was needed.
VVednesday, August 21, 2002
Page 1 of 1
Facility
GATHERING CENTER 3
Disposition
1. Sold
2. Reinjected
3. Flared or vented less than 1 hour.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of is position
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 09/2002
Volume MCF"
"Indicate contribution of each pool to total.
o
Pool Name
Code
Percent
o
PRUDHOE
640150
100.00%
9,165
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge
6. Used for lease operations
7. Other
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to: CCP
Remarks:
TOTAL items 1 - 7
Signature:
Form 10-422 (Revised 4/95)
true and correct to the best of my knowledge.
Title: SUPERVISOR
Fuel
Assist
800
18,063
502,890
o
Lift Gas, Off Field
o
530,918
1. Safety
ßOo MCF ~
o
2. Lease Use
MCF
o
3. Conserv. Purposes
MCF
o
10, .r-(o J-
Date
.¡
28,801,330
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
September 2002
Page 1
IUnplanned Events less than or e«:ual to 1 hour
DATE TIME VOLuME DESCRIPTION DFINCII)!N)'8,CAU$!
9/1/2002 1346-1413 . 7~.CeqUired for un.. planned events which
9/4/2002 1309-1327 C'-·2Ö~ ess than or equal to 1 hour
9/6/2002 1219-1317-725
9/7/2002 0536-0635 820 \~ A.Mb~/;t Ìè^'\fS'
9/7/2002 1138-1214 500
9/10/2002 0820-0859 650
9/14/2002 1411-1504 663
9/17/2002 1500-1546 1,086
9/20/2002 0054-0130 625
9/20/2002 1410-1421 115
9/20/2002 2016-2046 500
9/21/2002 1349-1443 638
9/21/2002 1516-1546 250
9/23/2002 0232-0244 100
9/23/2002 1043-1110 225
9/24/2002 0858-0932 213
9/24/2002 0959-1010 92
9/26/2002 0436-0442 33
9/26/2002 0958-1006 83
9/27/2002 0338-0400 183
9/27/2002 1347-1352 35
9/27/2002 2347-2353 33
9/28/2002 1823-1854 646
Cõ q b5'"
;
TOTAL
~
ACTION TAKEN TO EUMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
()S~.. .
t z.{ n~{ , -r..---
IUnplanned Events IIreater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
9/4/2002 1532-1649 800 See Attachments '\he¡'" ~è:J- ~achments
TOTAL
,f)/dff'
I roO
I
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
OAT! TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL
o
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
800
o
o
28,028
GfIL. (Lf ¡~/ùV'
I
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
10/4/2002
2:31 PM
bp
REPORT NO: 02-0610
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 04 Sep 2002
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
13:09 13:27 OHrs 18 Mins 0 0 0 200 MSCF
15:32 16:49 1 Hrs 17Mins 0 0 0 800 MSCF
TOTAL VOLUME 1,000 MSCF
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient
temperature increased by 10°F.
2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient
temperature increased by 10°F (65°F).
Action Taken to Stop Flaring:
1. WOA reduced production rates equaling 100 mmscfd. Wells were shut-in or choked back starting at
1315 hours.
2. WOA reduced production rates equaling 450 mmscfd. EOA reduced production rates 140 mmscfd.
Wells were shut-in or choked back starting at 14:45 hours.
Wednesday, September 25,2002
Page 1 of 1
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 10/2002
GATHERING CENTER 3
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 5,727
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 18,233
6. Used for lease operations Fuel 545,999
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 . 7 569,959
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 28,888,190
Remarks:
A
I hereby cer¿ thë1t f~ing is t~~ and correct to the best of my knowledge.
Signature: . ( 1 A^ 1. Title: SUPERVISOR
Form 10-422 (Revised 4/95)
'-.:'
>Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
SP EXPLORATION (ALASKA) INC.
PRUDHOE SAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
October 2002
10/5/2002
10/8/2002
1 0/8/2002
1 0/9/2002
10/12/2002
10/12/2002
1 0/16/2002
10/16/2002
10/19/2002
10/20/2002
1 0/22/2002
10/24/2002
10/25/2002
10/25/2002
10/25/2002
10/25/2002
1 0/25/2002
1 0/26/2002
10/26/2002
10/27/2002
10/27/2002
10/28/2002
1 0/28/2002
1 0/29/2002
10/29/2002
10/30/2002
10/31/2002
0635-0711
0315-0323
1259-1316
0347-0354
1110-1151
1925-1935
0924-1019
1046-1054
0745-0838
1418·1432
1133-1138
1327-1345
0323-0329
0833-0846
0859-0906
1212-1222
2323-2327
1854-1859
2223-2228
1332-1347
2322-2326
1438-1445
2014-2021
1426-1446
1735-1813
2245-2337
0636-0710
TOTAL
375 are less than or equal to 1 hour
50
150
39
513
56
229
33
1,104
78
35
188
83
135
49
69
42
28
42
104
28
49
122
139
660
975
302
5,727
TOTAL
o
Page 1
are less than or equal to 1 hour
TOTAL
o
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events" 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
5000 Met
o
o
o
23,960
11f712002
3:09 PM
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 11/2002
GATHERING CENTER 3
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 4,928
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 20,519
6. Used for lease operations Fuel 496,089
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 521,536
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 24,730,842
Remarks:
I hereby ce, D th(OregOing iV:ue and correct to the best of my knowledge.
Signature: . . ...A .4 A"" P,. Title: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1 . Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
November 2002
Page 1
~UnPlanned Events less than or equal to 1 hour
DATE TIME vOLUME DESCRIPTION ofINcIPI;NT&:CAUSI;
11/9/2002 2149-2155 42 Not required for unplanned events which
11/9/2002 2224-2230 63 are less than or equal to 1 hour
11/10/2002 0031-0043 83
11/10/2002 0151-0243 542
11/11/2002 1319-1324 42
11/12/2002 2107-2133 181
11/13/2002 0858-0952 177 Intermittent
11/13/2002 1150-1212 229
11/14/2002 1130-1137 49
11/15/2002 0233-0305 200 Intermittent
11/15/2002 1556-1620 666
11/15/2002 2344-2359 104
11/16/2002 0042-0053 100
11/16/2002 0115-0207 550
11/16/2002 1144-1223 1,760
11/20/2002 2143-2148 38
11/23/2002 1400-1430 1 02
TOTAL
4,928
ACTION TAKEN TO EUMINATE CAUSE
See Attachments
~Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL
o
ACTION TAKEN TO EUMINATe CAUSe
See Attachments
~Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DATE TIME vOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL
o
~Planned Events Exceeding 1 Hour OR Exceeding 5000 Mct
DATE TIME VOLUME DeSCRIPTION OF INCIDENT & CAuse
See Attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
o
o
o
25,447
ACTION TAKEN TO EUMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO EUMINATE CAUSE
See Attachments
12/9/2002
11:10AM
GATHERING CENTER 3
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 12/2002
Facility
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 2,751
4. Flared or vented greater than 1 hour 3,438 ./
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 20,054
6. Used for lease operations Fuel 558,077
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 584,320
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 29,369,556
Remarks:
I hereby ce~(ytre:jg is true and correct to the best of my knowledge.
Signature:, · . J, Title: SUPERVISOR
Form 10-422 (Revised 4/951
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
~ 43<1) MCF CJ''ß,&2...-
2. Lease Use
MCF
3. Conserv. Purposes
MCF
:10 /0 j
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
SP EXPLORATION (ALASKA) INC.
PRUDHOE SA V UNIT - GC·3
GAS FLARING INCIDENT REPORT
December 2002
Page 1
~UnPlanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTIONOF INCIPENT & CAUSE
12/3/2002 1626-1642 167 Not required for unplanned events which
12/4/2002 0258-0304 50 are less than or equal to 1 hour
12/7/2002 1036-1131 764
12/7/2002 2310-2340 125
12/8/2002 2033-2052 79
12/9/2002 0510-0526 67
12/11/2002 0318-0330 42
12/11/2002 0337-0346 31
12/11/2002 2033-2039 25
12/12/2002 0103-0111 44
12/12/2002 1254-1715 556 Intermittent - 40 mins
12/19/2002 1611-1619 67
12/20/2002 1320-1329 1 06
12/21/2002 0941-0945 28
12/21/2002 1410-1415 38
12/24/2002 0739-1039 347 Intermittent - 50 mins
12/30/2002 1018-1040 153
12/31/2002 0640-0651 38
12/31/2002 1658-1705 24
TOTAL 2,751
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
lunplanned Events greater than 1 hour
PATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
12/4/2002 0345-0710 3.438 See Attachments
TOTAL
3.438
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
Planned Events Less Than or Equal 1 Hour AND Not Exceedin 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT Ø'CAUSE
See Attachments
TOTAL
o
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mct
DATE TIME VOL.UME PESCRIPTIONOFINCIPENT&CAUSE
See Attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5.000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
TOTAL
2,751
3,438
o
o
26,243
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
1/10/2003
3:20 PM
REPORT NO: 02-0856
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 04 Dee 2002
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
02:58 03:04 OHrs 6Mins 0 0 0 50 MSCF
03:45 07:10 3Hrs 25 Mins 0 0 0 3,438 MSCF /'
TOTAL VOLUME 3,488 MSCF
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient
temperature increased by 10°F.
2. Extended flaring event occurred while awaiting GC operator/maintenance evaluation. Determined
PSV malfunction off of LPS discharge in piperack.
Action Taken to Stop Flaring:
1. WOA stopped bringing production rates up and moved rate to Annex
2. WOA reduced production rates and moved 4 wells equaling 75 mmscfd to Annex, also moved
another 125mm from LP to HP to reduce flaring. (200mm total cut) Wells were shut-in or choked
back starting at 0415 hours. 0640 cut an additional 11 Omm. PSV crew is on location.
Thursday, December 26, 2002