Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutNorthstar / BP Exploration STATE OF ALASKA OIL & GAS CONSERVATION COMMISSION FIELD & POOL: NORTHSTAR PRODUCTION FILES YEAR: 2002 OPERATOR: BP Exploration Run Date: Run Time: PA: OA: 02/18/2002 13:12:56 NSTR NSTR Report # SUM DUO - 05 BP Exploration (Alaska) Inc. Oil Movement Accounting & Reporting Alaska Oil and Gas Conservation Commission Oil Reconciliation Report From Date: To Date: 01/01/2002 01/31/2002 Oil Volume 1,106,528 1,106,528 o o -135 1,106,393 I hereby certrrat the ãregOing is true and correct to the best of my knowledge. Signed: ¡¿ O. JJ ~A Title: (\t bit ,Ax Description Pipeline Deliveries NSTR TOTAL PIPELINE DELIVERIES NGL Deliveries NSTR/NONE TOTAL NGL & TIK RECEIVED Load Diesel NSTR/NSTR FIELD PRODUCTION TOTAUNSTR Page 1 Date: ~I or ( oz..- Run Date: 02/18/2002 Run Time: 13:12:42 BP Exploration (Alaska) Inc. Well Name API Number 50- NS09 NS13 NS27 0292305200 0292301700 0292300300 T Y P E 1 1 1 Field & Pool Code 590100 590100 590100 M E T H 1 1 1 590100 Northstar Pool Production Totals.......................... Form 10-405 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Production Report Days In Oper. 16 31 31 20 AAC 25.230 Northstar Page 1 January, 2002 Total Monthly Production Oil Water Gas BBL BBL MCF Daily Average Production Tubing Oil Water Gas PSIG BBL BBL MCF 1,241 10,543 29 23,443 168,685 467 375,089 800 10,269 39 21,819 318,341 1,204 676,399 1,032 19,980 76 42,596 619,367 2,354 1,320,463 1 ,106,393 4,025 2,371,951 Run Date: 02/18/2002 Run Time: 13: 12:48 BP Exploration (Alaska) Inc. Well API T Field M Days Name Number Y & E In so- P Pool T Oper. E Code H NS10 0292298500 5 590036 9 31 590036 Pool Injection Totals...................... NS29 0292300500 4 590100 NS31 0292300900 4 590100 590100 Pool Injection Totals...................... 8 7 N1 Gathering Center Totals.......................................... Field Injection Total................................................................................ Form 10-406 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Injection Report 20 AAC 25.432 Northstar Tubing Pressure Max Average PSIG PSIG 750.03 711.60 o 30 0.00 6,652.48 0.00 4,984.30 Northstar Casing Pressure Max Average PSIG PSIG 0.00 0.00 0.00 0.00 0.00 0.00 Daily Average Injection Liquid Gas BBL MCF 2,057 o o o 112,367 Page 1 January, 2002 Total Monthly Injection Liquid Gas BBL MCF o 63,768 0 63,768 0 0 0 0 3,371,029 0 3,371,029 63,768 3,371,029 63,768 3,371,029 Run Date: Run Time: PA: OA: 03/18/2002 15:02:30 NSTR NSTR Report # SUMDÚD - 05 ' BP Exploration (Alaska) Inc. Oil Movement Accounting & Reporting Alaska Oil and Gas Conservation Commission Oil Reconciliation Report From Date: To Date: Description Pipeline Deliveries NSTR TOTAL PIPELINE DELIVERIES NGL Deliveries NSTR/NONE TOTAL NGL & TIK RECEIVED Load Diesel NSTR/NSTR FIELD PRODUCTION TOTAUNSTR I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed: QQ. L~ Title: M~r¿ -r: Ax.. Page 1 02/01/2002 02/28/2002 Oil Volume 1,011,330 1,011,330 o o -109 1,011,221 Date: ~o'Z- Run Date: 03/18/2002 Run Time: 15:02: 14 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Production Report BP Exploration (Alaska) Inc. Well API T Field M Days Name Number Y & E In so- P Pool T Oper. E Code H NS09 0292305200 1 590100 1 23 NS13 0292301700 1 590100 1 28 NS14 0292302600 1 590100 8 8 NS27 0292300300 1 590100 1 27 590100 Northstar Pool Production Totals.......................... Form 10-405 20 AAC 25.230 Northstar Page 1 February, 2002 Total Monthly Production Oil Water Gas BBL BBL MCF Daily Average Production Tubing Oil Water Gas PSIG BBL BBL MCF 1,050 10,917 22 19,873 251 ,1 00 497 457,077 1,201 8,461 20 15,196 236,900 553 425,483 446 10,253 26 16,484 82,021 209 131,873 1,293 16,341 35 29,408 441,200 933 794,021 1,011,221 2,192 1,808,454 Run Date: 03/18/2002 Run Time: 15:02:23 BP Exploration (Alaska) Inc. Well API T Field M Days Name Number Y & E In so- P Pool T Oper. E Code H NS10 0292298500 5 590036 9 28 590036 Pool Injection Totals...................... NS29 0292300500 4 590100 NS31 0292300900 4 590100 590100 Pool Injection Totals...................... 7 7 N1 Gathering Center Totals.......................................... Field Injection Total................................................................................ Form 10-406 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Injection Report 20 AAC 25.432 Northstar Tubing Pressure Max Average PSIG PSIG 750.03 719.60 13 24 5,066.83 8,426.32 4,320.70 4,476.40 Northstar Casing Pressure Max Average PSIG PSIG 0.00 0.00 0.00 0.00 0.00 0.00 Daily Average Injection Liquid Gas BBL MCF 3,246 o o 52,871 82,605 Page 1 February, 2002 Total Monthly Injection Liquid Gas BBL MCF o 90,894 0 90,894 0 0 687,334 0 1,982,529 0 2,669,863 90,894 2,669,863 90,894 2,669,863 Run Date: Run Time: PA: OA: 04/15/2002 15:43:16 NSTR NSTR Report # SUMDUD - 05 BP Exploration (Alaska) Inc. Oil Movement Accounting & Reporting Alaska Oil and Gas Conservation Commission Oil Reconciliation Report From Date: To Date: Description Pipeline Deliveries NSTR TOTAL PIPELINE DELIVERIES NGL Deliveries NSTR/NONE TOTAL NGL & TIK RECEIVED Load Diesel NSTR/NSTR FIELD PRODUCTION TOTAUNSTR I hereby certify that t e foregoing is true and correct to the best of my knowledge. Signed: Title: ~ (l 'f A )( Page 1 03/01/2002 03/31/2002 Oil Volume 1,554,155 1,554,155 o o -64 1,554,091 Date: ~O-z.. Run Date: 04/15/2002 Run Time: 15:36:06 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Production Report 20 AAC 25.230 Page 1 BP Exploration (Alaska) Inc. Northstar March, 2002 Daily Average Production Total Monthly Production Well API T Field M Days Tubing Oil Water Gas Oil Water Gas Name Number Y & E In PSIG BBL BBL MCF BBL BBL MCF so- P Pool T Oper. E Code H NS08 0292306800 1 590100 1 10 1,890 7,103 0 14,034 71,034 4 140,341 NS09 0292305200 1 590100 1 31 1,153 11 ,217 0 20,997 347,712 2 650,895 NS13 0292301700 1 590100 1 31 1,128 8,297 0 15,257 257,219 0 472,972 NS14 0292302600 1 590100 1 31 1,137 14,744 2 27,529 457,057 53 853,387 NS27 0292300300 1 590100 1 31 1,140 13,583 70 28,641 421,069 2,155 887,863 590100 Northstar Pool Production Totals.......................... 1,554,091 2,214 3,005,458 Form 10-405 Run Date: 04/15/2002 Run Time: 15:36:18 BP Exploration (Alaska) Inc. Well API T Field M Days Name Number y & E In so- P Pool T Oper. E Code H NS10 0292298500 5 590036 9 31 590036 Pool Injection Totals...................... NS29 0292300500 4 590100 NS31 0292300900 4 590100 590100 Pool Injection Totals...................... 7 7 N1 Gathering Center Totals.......................................... Field Injection Total................................................................................ Form 10-406 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Injection Report 20 AAC 25.432 Northstar Tubing Pressure Max Average PSIG PSIG 1,220.71 929.40 31 31 5,876.24 5,680.19 4,780.60 4,817.80 Northstar Casing Pressure Max Average PSIG PSIG 0.00 0.00 0.00 0.00 0.00 0.00 Daily Average Injection Liquid Gas BBL MCF 3,446 o o 69,553 94,861 Page 1 March, 2002 Total Monthly Injection Liquid Gas BBL MCF o 106,840 0 106,840 0 0 2,156,170 0 2,940,709 0 5,096,879 106,840 5,096,879 106,840 5,096,879 Run Date: Run Time: PA: OA: 05/15/2002 10:07:26 NSTR NSTR Report # SUMDUD - 05' BP Exploration (Alaska) Inc. Oil Movement Accounting & Reporting Alaska Oil and Gas Conservation Commission Oil Reconciliation Report From Date: To Date: Description Pipeline Deliveries NSTR TOTAL PIPELINE DELIVERIES NGL Deliveries NSTR/NONE TOTAL NGL & TIK RECEIVED FIELD PRODUCTION TOTAUNSTR I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed: _(2.0. ~~ Title: Me, It ~X Page 1 04/01/2002 04/30/2002 Oil Volume 1,092,774 1,092,774 o o 1,092,774 Date: ~()~ Run Date: 05/15/2002 Run Time: 10:07:05 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Production Report 20 AAC 25.230 Page 1 BP Exploration (Alaska) Inc. Northstar April, 2002 Daily Average Production Total Monthly Production Well API T Field M Days Tubing Oil Water Gas Oil Water Gas Name Number Y & E In PSIG BBL BBL MCF BBL BBL MCF SO- P Pool T Oper. E Code H NS08 0292306800 1 590100 1 15 1,339 14,086 0 28,705 211,293 0 430,579 NS09 0292305200 1 590100 1 15 869 14,356 1 29,872 215,345 17 448,083 NS13 0292301700 1 590100 1 17 762 9,494 0 18,812 161,404 0 319,809 NS14 0292302600 1 590100 1 28 1,522 13,147 7 28,592 368,128 204 800,587 NS27 0292300300 1 590100 1 17 1,954 8,036 10 20,562 136,604 163 349,561 590100 Northstar Pool Production Totals.......................... 1,092,774 384 2,348,619 Form 10-405 Run Date: 05/15/2002 Run Time: 10:07:15 BP Exploration (Alaska) Inc. Well API T Field M Days Name Number Y & E In so- P Pool T Oper. E Code H NS10 0292298500 5 590036 9 30 590036 Pool Injection Totals...................... NS29 0292300500 4 590100 NS31 0292300900 4 590100 590100 Pool Injection Totals...................... 7 7 N1 Gathering Center Totals.......................................... Field Injection Total................................................................................ Form 10-406 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Injection Report 20 AAC 25.432 Northstar Tubing Pressure Max Average PSIG PSIG 1,203.62 1,086.00 29 27 5,679.15 5,546.60 4,817.00 4,814.30 Northstar Casing Pressure Max Average PSIG PSIG 0.00 0.00 0.00 0.00 0.00 0.00 Daily Average Injection Liquid Gas BBL MCF 2,234 o o 62,003 90,716 Page 1 April, 2002 Total Monthly Injection Liquid Gas BBL MCF o 67,025 0 67,025 0 0 1,798,110 0 2,449,350 0 4,247,460 67,025 4,247,460 67,025 4,247,460 Run Date: Run Time: PA: OA: 06/18/2002 13:35:47 NSTR NSTR BP Exploration (Alaska) Inc. Oil Movement Accounting & Reporting Alaska Oil and Gas Conservation Commission Oil Reconciliation Report From Date: 05/01/2002 To Date: 05/31/2002 Description Pipeline Deliveries NSTR TOTAL PIPELINE DELIVERIES NGL Deliveries NSTR/NONE TOTAL NGL & TIK RECEIVED Load Diesel NSTR/NSTR FIELD PRODUCTION TOTAUNSTR I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed: ~±-~ Title: ~ot1 \ kId,! ~ 1- Page 1 Oil Volume 1,083,395 1,083,395 o o -7 1,083,388 Date: IJ /, fJ / ()'Z- I I Report # SUMDUÕ - 05 . Run Date: 06/18/2002 Run Time: 13:35:30 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Production Report 20 AAC 25.230 Page 1 BP Exploration (Alaska) Inc. Northstar May, 2002 Daily Average Production Total Monthly Production Well API T Field M Days Tubing Oil Water Gas Oil Water Gas Name Number y & E In PSIG BBL BBL MCF BBL BBL MCF so- P Pool T Oper. E Code H NS08 0292306800 1 590100 1 22 1,913 7,963 0 14,033 175,185 0 308,725 NS09 0292305200 1 590100 1 22 1,498 7,705 0 13,817 169,510 10 303,965 NS13 0292301700 1 590100 1 23 1,246 7,181 17 15,755 165,153 402 362,361 NS14 0292302600 1 590100 1 26 1,453 12,824 29 34,949 333,436 751 908,677 NS15 0292307300 1 590100 1 14 2,083 3,744 5 7,493 52,409 67 104,906 NS27 0292300300 1 590100 1 25 1,815 7,508 0 20,299 187,695 1 507,482 590100 Northstar Pool Production Totals.......................... 1,083,388 1,231 2,496,116 Form 10-405 Run Date: 06/18/2002 Run Time: 13:35:39 BP Exploration (Alaska) Inc. Well API T Field M Days Name Number Y & E In so- P Pool T Oper. E Code H NS10 0292298500 5 590036 9 31 590036 Pool Injection Totals...................... State of Alaska Alaska Oil and Gas Conservation Commission Monthly Injection Report 20 AAC 25.432 Northstar Tubing Pressure Max Average PSIG PSIG Northstar Casing Pressure Max Average PSIG PSIG Daily Average Injection Liquid Gas BBL MCF Page 1 May, 2002 Total Monthly Injection Liquid Gas BBL MCF NS29 0292300500 4 590100 NS31 0292300900 4 590100 590100 Pool Injection Totals...................... 7 7 N1 Gathering Center Totals.......................................... Field I njection Total................................................................................ Form 10-406 1,242.48 944.40 31 30 4,534.30 4,540.80 5,875.12 6,029.66 0.00 0.00 0.00 0.00 0.00 0.00 2,036 o o 45,244 67,256 o 63,138 0 63,138 0 0 1,402,579 0 2,017,695 0 3,420,274 63,138 3,420,274 63,138 3,420,274 Run Date: Run Time: PA: OA: 07/17/2002 14:13:59 NSTR NSTR BP Exploration (Alaska) Inc. Oil Movement Accounting & Reporting Alaska Oil and Gas Conservation Commission Oil Reconciliation Report From Date: To Date: 06/01/2002 06/30/2002 Description Pipeline Deliveries NSTR TOTAL PIPELINE DELIVERIES NGL Deliveries NSTR/NONE TOTAL NGL & TIK RECEIVED FIELD PRODUCTION TOTAUNSTR I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed: (2. Q. Yp Tille: ¡U6Q.. ,A"X Oil Volume 1,827,325 1,827,325 o o 1,827,325 Date: Page 1 1/11/07.- . Report # SUMDUD - 05 . Run Date: 07/17/2002 Run Time: 14: 13:42 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Production Report 20 AAC 25.230 Page 1 BP Exploration (Alaska) Inc. Northstar June, 2002 Daily Average Production Total Monthly Production Well API T Field M Days Tubing Oil Water Gas Oil Water Gas Name Number Y & E In PSIG BBL BBL MCF BBL BBL MCF so- P Pool T Oper. E Code H NS08 0292306800 1 590100 1 29 1,236 14,246 0 30,182 413,123 0 875,270 NS09 0292305200 1 590100 1 30 1,051 11 ,502 25 23,036 345,059 735 691,081 NS13 0292301700 1 590100 1 27 903 8,480 0 17,744 228,952 0 479,098 NS14 0292302600 1 590100 1 28 1,155 13,913 0 45,257 389,567 0 1,267,187 NS15 0292307300 1 590100 1 30 2,020 4,927 99 9,564 147,800 2,980 286,931 NS27 0292300300 1 590100 1 29 1,536 10,442 0 30,020 302,824 4 870,574 590100 Northstar Pool Production Totals.......................... 1,827,325 3,719 4,470,141 Form 10-405 Run Date: 07/17/2002 Run Time: 14:13:51 BP Exploration (Alaska) Inc. Well API T Field M Days Name Number y & E In so- P Pool T Oper. E Code H NS10 0292298500 5 590036 9 30 590036 Pool Injection Totals...................... NS29 0292300500 4 590100 NS31 0292300900 4 590100 590100 Pool Injection Totals...................... 7 7 N1 Gathering Center Totals.......................................... Field Injection Total................................................................................ Form 10-406 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Injection Report 20 AAC 25.432 Northstar Tubing Pressure Max Average PSIG PSIG 1,139.78 982.00 29 29 23,779.53 23,957.10 5,897.20 5,947.70 Northstar Casing Pressure Max Average PSIG PSIG 0.00 0.00 0.00 0.00 0.00 0.00 Daily Average Injection Liquid Gas BBL MCF 2,409 o o 77,958 111,960 Page 1 June, 2002 Total Monthly Injection Liquid Gas BBL MCF o 72,281 0 72,281 0 0 2,260,791 0 3,246,840 0 5,507,631 72,281 5,507,631 72,281 5,507,631 I hereby certify that the foregoing is true and correct to the best of my knowledge. rZO. ~~ Run Date: Run Time: PA: OA: Signed: 08/15/2002 16:22:59 NSTR NSTR BP Exploration (Alaska) Inc. Oil Movement Accounting & Reporting Alaska Oil and Gas Conservation Commission Oil Reconciliation Report From Date: 07/01/2002 To Date: 07/31/2002 Description Pipeline Deliveries NSTR Oil Volume 1,772,281 1,772,281 TOTAL PIPELINE DELIVERIES NGL Deliveries NSTR/NONE o TOTAL NGL & TIK RECEIVED o Load Diesel NSTR/NSTR -12 FIELD PRODUCTION TOTAUNSTR 1,772,269 Title: flA6fL íAX Date: Page 1 ð {/<.. ! crt.. Report # SUMDUO - 05 . Run Date: 08/15/2002 Run Time: 16:22:36 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Production Report 20 AAC 25.230 Page 1 BP Exploration (Alaska) Inc. Northstar July, 2002 Daily Average Production Total Monthly Production Well API T Field M Days Tubing OiL Water Gas Oil Water Gas Name Number Y & E In PSIG BBL BBL MCF BBL BBL MCF so- P Pool T Oper. E Code H NS07 0292308100 1 590100 1 31 1 ,443 9,935 3 19,242 307,991 87 596,512 NS08 0292306800 1 590100 1 26 993 16,647 0 43,908 432,820 0 1,141,603 NS09 0292305200 1 590100 1 26 928 12,349 54 28,974 321,063 1 ,407 753,333 NS13 0292301700 1 590100 1 25 783 7,686 0 19,222 192,160 0 480,550 NS14 0292302600 1 590100 1 26 2,062 6,662 77 30,525 173,211 1,993 793,653 NS15 0292307300 1 590100 1 26 1,056 6,764 220 16,585 175,875 5,732 431,201 NS27 0292300300 1 590100 1 16 1,469 10,572 19 45,145 169,149 308 722,313 590100 Northstar Pool Production Totals.......................... 1 ,772,269 9,527 4,919,165 Form 10-405 Run Date: 08/15/2002 Run Time: 16:22:49 BP Exploration (Alaska) Inc. Well API T Field M Days Name Number y & E In so- P Pool T Oper. E Code H NS10 0292298500 5 590036 9 31 590036 Pool Injection Totals...................... State of Alaska Alaska Oil and Gas Conservation Commission Monthly Injection Report 20 AAC 25.432 Northstar Tubing Pressure Max Average PSIG PSIG Northstar Casing Pressure Max Average PSIG PSIG Daily Average Injection Liquid Gas BBL MCF Page 1 July, 2002 Total Monthly Injection Liquid Gas BBL MCF NS29 0292300500 4 590100 NS31 0292300900 4 590100 590100 Pool Injection Totals...................... 7 7 N1 Gathering Center Totals.......................................... Field I njection Total................................................................................ Form 10-406 1,222.36 1,086.40 31 31 6,133.39 6,116.35 5,270.00 5,277.10 0.00 0.00 0.00 0.00 0.00 0.00 2,765 o o 92,491 121,558 o 85,741 0 85,741 0 0 2,867,230 0 3,768,318 0 6,635,548 85,741 6,635,548 85,741 6,635,548 Run Date: Run Time: PA: OA: 09/17/2002 12:13:45 NSTR NSTR BP Exploration (Alaska) Inc. Oil Movement Accounting & Reporting Alaska Oil and Gas Conservation Commission Oil Reconciliation Report From Date: 08/01/2002 To Date: 08/31/2002 Description Pipeline Deliveries NSTR Oil Volume 1,846,225 TOTAL PIPELINE DELIVERIES 1,846,225 NGL Deliveries NSTR/NONE o TOTAL NGL & TIK RECEIVED o Load Diesel NSTR/NSTR -5 FIELD PRODUCTION TOTAUNSTR 1,846,220 I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed: 0. Q. ~~.L Date: ~O1- Title: V\1,~Q TA:x Page 1 Report # SUMDUD - 05 Run Date: 09/17/2002 Run Time: 12: 13:36 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Production Report 20 AAC 25.230 Page 1 BP Exploration (Alaska) Inc. Northstar August, 2002 Daily Average Production Total Monthly Production Well API T Field M Days Tubing Oil Water Gas Oil Water Gas Name Number Y & E In PSIG BBL BBL MCF BBL BBL MCF so- P Pool T Oper. E Code H NS07 0292308100 1 590100 1 31 962 11 ,802 171 27,946 365,868 5,300 866,337 NS08 0292306800 1 590100 1 31 1,046 14,187 0 43,898 439,807 9 1,360,832 NS09 0292305200 1 590100 1 31 828 11 ,568 169 28,507 358,596 5,240 883,718 NS13 0292301700 1 590100 1 31 771 6,573 6 17,493 203,757 195 542,275 NS14 0292302600 1 590100 1 31 1,243 9,943 192 47,850 308,226 5,965 1 ,483,350 NS15 0292307300 1 590100 1 30 730 5,666 23 14,236 169,966 693 427,083 590100 Northstar Pool Production Totals.......................... 1 ,846,220 17,402 5,563,595 Form 10-405 Run Date: 09/17/2002 Run Time: 13:06:08 BP Exploration (Alaska) Inc. Well API T Field M Days Name Number Y & E In SO- P Pool T Oper. E Code H NS10 0292298500 5 590036 9 31 590036 Pool Injection Totals...................... State of Alaska Alaska Oil and Gas Conservation Commission Monthly Injection Report 20 AAC 25.432 Northstar Tubing Pressure Max Average PSIG PSIG Northstar Casing Pressure Max Average PSIG PSIG 1,305.01 1,153.90 0.00 0.00 NS27 0292300300 4 590100 7 25 5,241.29 4,731.10 0.00 0.00 NS29 0292300500 4 590100 7 31 5,384.20 5,006.00 0.00 0.00 NS31 0292300900 4 590100 7 31 5,432.40 5,013.60 0.00 0.00 590100 Pool Injection Totals...................... N1 Gathering Center Totals.......................................... Field Injection Total................................................................................ Form 10-406 Daily Average Injection Liquid Gas BBL MCF 1,824 o 79,743 o 71,797 o 94,157 Page 1 August, 2002 Total Monthly Injection Liquid Gas BBL MCF o 56,560 0 56,560 0 0 1,993,575 0 2,225,734 0 2,918,884 0 7,138,193 56,560 7,138,193 56,560 7,138,193 I hereby certify thaf 1l:go¡ng is true and correct to the best of my knowledge. SIgned: Q,O. rJ J.. TIlle: I'Ÿ>ha Run Date: Run Time: PA: OA: 1 0/16/2002 09:36:42 NSTR NSTR BP Exploration (Alaska) Inc. Oil Movement Accounting & Reporting Alaska Oil and Gas Conservation Commission Oil Reconciliation Report Report # SUMDUD - 05· From Date: 09/01/2002 To Date: 09/30/2002 Description Pipeline Deliveries NSTR Oil Volume 1 ,356,559 1,356,559 TOTAL PIPELINE DELIVERIES NGL Deliveries NSTR/NONE o TOTAL NGL & TIK RECEIVED o Load Diesel NSTR/NSTR -4 FIELD PRODUCTION TOTAUNSTR 1,356,555 1)C()( lD/L(o{07.. Date: Page 1 Run Date: 10/16/2002 Run Time: 11: 17:26 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Production Report 20 AAC 25.230 Page 1 BP Exploration (Alaska) Inc. Northstar September, 2002 Daily Average Production Total Monthly Production Well API T Field M Days Tubing Oil Water Gas Oil Water Gas Name Number Y & E In PSIG BBL BBL MCF BBL BBL MCF so- P Pool T Oper. E Code H NS07 0292308100 1 590100 1 27 922 11 ,252 221 23,571 303,808 5,980 636,416 NS08 0292306800 1 590100 1 28 1,177 12,115 49 38,589 339,225 1,361 1,080,502 NS09 0292305200 1 590100 1 27 954 10,577 72 23,888 285,571 1,946 644,985 NS13 0292301700 1 590100 1 29 946 5,427 40 12,226 157,394 1,161 354,556 NS14 0292302600 1 590100 1 19 1 ,469 8,361 117 37,645 158,855 2,216 715,246 NS15 0292307300 1 590100 1 28 896 3,989 46 8,189 111 ,702 1,299 229,297 590100 Northstar Pool Production Totals.......................... 1 ,356,555 13,963 3,661,002 Form 10-405 Run Date: 10/16/2002 Run Time: 09:36:32 BP Exploration (Alaska) Inc. Well API T Field M Days Name Number Y & E In so- P Pool T Oper. E Code H NS10 0292298500 5 590036 9 30 590036 Pool Injection Totals...................... NS27 0292300300 4 590100 NS29 0292300500 4 590100 NS31 0292300900 4 590100 590100 Pool Injection Totals...................... 7 7 7 N1 Gathering Center Totals.......................................... Field Injection Total................................................................................ Form 10-406 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Injection Report 20 AAC 25.432 Northstar Tubing Pressure Max Average PSIG PSIG 1,301.05 1,161.30 30 30 30 5,265.95 5,320.78 5,324.82 4,663.10 4,705.50 4,679.70 Northstar Casing Pressure Max Average PSIG PSIG 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Daily Average Injection Liquid Gas BBL MCF 2,324 o o o 60,016 39,755 70,103 Page 1 September, 2002 Total Monthly Injection Liquid Gas BBL MCF o 69,746 0 69,746 0 0 1 ,800,483 0 1,192,664 0 2,103,116 0 5,096,263 69,746 5,096,263 69,746 5,096,263 Run Date: Run Time: PA: OA: 11/14/2002 16:40:00 NSTR NSTR BP Exploration (Alaska) Inc. Oil Movement Accounting & Reporting Alaska Oil and Gas Conservation Commission Oil Reconciliation Report From Date: To Date: Description Pipeline Deliveries NSTR TOTAL PIPELINE DELIVERIES NGL Deliveries NSTR/NONE TOTAL NGL & TIK RECEIVED Load Diesel NSTR/NSTR FIELD PRODUCTION TOTAUNSTR I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed: fZ8 IA~ - - Title: mGrL. TAX Page 1 1 % 1/2002 1 0/31/2002 Oil Volume 1,858,526 1,858,526 o o -2 1 ,858,524 Date: 1l¡/'0/6?. Report # SUMDUD - 05 Run Date: 11/14/2002 Run Time: 16:39:31 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Production Report 20 AAC 25.230 Page 1 BP Exploration (Alaska) Inc. Northstar October, 2002 Daily Average Production Total Monthly Production Well API T Field M Days Tubing Oil Water Gas Oil Water Gas Name Number Y & E In PSIG BBL BBL MCF BBL BBL MCF so- P Pool T Oper. E Code H NS07 0292308100 1 590100 1 29 799 12,597 461 26,164 365,314 13,377 758,747 NS08 0292306800 1 590100 1 29 921 15,038 60 53,898 436,103 1,733 1,563,056 NS09 0292305200 1 590100 1 29 832 12,285 96 30,039 356,263 2,783 871,136 NS13 0292301700 1 590100 1 29 752 5,558 39 11,716 161,173 1,137 339,773 NS14 0292302600 1 590100 1 29 1,050 12,167 264 57,539 352,845 7,667 1,668,627 NS15 0292307300 1 590100 1 29 790 6,442 261 13,368 186,826 7,572 387,664 590100 Northstar Pool Production Totals.......................... 1,858,524 34,269 5,589,003 Form 10-405 Run Date: 11/14/2002 Run Time: 16:39:47 BP Exploration (Alaska) Inc. Well API T Field M Days Name Number Y & E In so- P Pool T Oper. E Code H NS10 0292298500 5 590036 9 31 590036 Pool Injection Totals...................... NS27 0292300300 4 590100 NS29 0292300500 4 590100 NS31 0292300900 4 590100 590100 Pool Injection Totals...................... 7 7 7 N1 Gathering Center Totals.......................................... Field Injection Total................................................................................ Form 10-406 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Injection Report 20 AAC 25.432 Northstar Tubing Pressure Max Average PSIG PSIG 1,204.47 1,114.60 31 31 31 5,357.25 5,449.11 5,457.08 5,029.70 5,127.50 5,087.20 Northstar Casing Pressure Max Average PSIG PSIG 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Daily Average Injection Liquid Gas BBL MCF 2,699 o o o 76,147 48,729 99,003 Page 1 October, 2002 Total Monthly Injection Liquid Gas BBL MCF o 83,675 0 83,675 0 0 2,360,559 0 1,510,609 0 3,069,115 0 6,940,283 83,675 6,940,283 83,675 6,940,283 Run Date: 12/17/2002 Run Time: 10:29:34 P A: NSTR OA: NSTR BP Exploration (Alaska) Inc. Oil Movement Accounting & Reporting Alaska Oil and Gas Conservation Commission Oil Reconciliation Report From Date: To Date: 11/01/2002 11/30/2002 Description Pipeline Deliveries NSTR TOTAL PIPELINE DELIVERIES NGL Deliveries NSTR/NONE TOTAL NGL & TIK RECEIVED FIELD PRODUCTION TOTAUNSTR I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed: QO. ~ J Title: r1/IA.:s/Z, TAX Oil Volume 1,678,500 1,678,500 o o 1,678,500 Date: Page 1 ,'- /Iv:> /0 v Report # SUMDUD - 05 Run Date: 12/17/2002 Run Time: 10:57:33 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Production Report 20 AAC 25.230 Page 1 BP Exploration (Alaska) Inc. Northstar November, 2002 Daily Average Production Total Monthly Production Well API T Field M Days Tubing Oil Water Gas Oil Water Gas Name Number Y & E In PSIG BBL BBL MCF BBL BBL MCF SO- P Pool T Oper. E Code H NS07 0292308100 1 590100 1 28 780 11,521 487 23,973 322,595 13,637 671,245 NS08 0292306800 1 590100 1 28 931 13,866 67 58,416 388,247 1,867 1,635,646 NS09 0292305200 1 590100 1 28 813 11,545 73 29,528 323,266 2,048 826,784 NS13 0292301700 1 590100 1 28 767 4,580 38 10,414 128,227 1,054 291,602 NS14 0292302600 1 590100 1 28 1,019 10,838 210 55,458 303,453 5,876 1,552,818 NS15 0292307300 1 590100 1 28 736 7,597 156 15,678 212,712 4,379 438,979 590100 Northstar Pool Production Totals.......................... 1,678,500 28,861 5,417,074 Form 10-405 Run Date: 12/17/2002 Run Time: 10:57:42 BP Exploration (Alaska) Inc. Well API T Field M Days Name Number y & E In so- P Pool T Oper. E Code H NS10 0292298500 5 590036 9 30 590036 Pool Injection Totals...................... NS27 0292300300 4 590100 NS29 0292300500 4 590100 NS31 0292300900 4 590100 590100 Pool Injection Totals...................... 7 7 7 N1 Gathering Center Totals.......................................... Field Injection Total........................................................ ........................ Form 10-406 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Injection Report 20 AAC 25.432 Northstar Tubing Pressure Max Average PSIG PSIG 1,241.11 1,030.40 28 28 28 5,351.95 5,314.59 5,360.47 4,996.40 5,063.70 5,049.00 Northstar Casing Pressure Max Average PSIG PSIG 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Daily Average Injection Liquid Gas BBL MCF 3,268 o o o 79,730 60,281 99,067 Page 1 November, 2002 Total Monthly Injection Liquid Gas BBL MCF o 98,065 0 98,065 0 0 2,232,462 0 1,687,874 0 2,773,881 0 6,694,217 98,065 6,694,217 98,065 6,694,217 Run Date: Run Time: PA: OA: Signed: 01/14/2003 15:52:06 NSTR NSTR BP Exploration (Alaska) Inc. Oil Movement Accounting & Reporting Alaska Oil and Gas Conservation Commission Oil Reconciliation Report From Date: To Date: 12/01/2002 12/31/2002 I hereby certify that the foregoing is true and correct to the best of my knowledge. QO. ~ A./,',? ~ Description Pipeline Deliveries NSTR TOTAL PIPELINE DELIVERIES NGL Deliveries NSTR/NONE TOTAL NGL & TIK RECEIVED Load Diesel NSTR/NSTR FI ELD PRODUCTION TOT AUNSTR Title: I1/t G(l -rA:X Date: Page 1 Oil Volume 1,715,395 1,715,395 o o -2 1,715,393 I ! I :yj 0 ~ Report # SUM DUD - 05 Run Date: 01/14/2003 Run Time: 16:07:09 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Production Report 20 AAC 25.230 Page 1 BP Exploration (Alaska) Inc. Northstar December, 2002 Daily Average Production Total Monthly Production Well API T Field M Days Tubing Oil Water Gas Oil Water Gas Name Number y & E In PSIG BBL BBL MCF BBL BBL MCF so- P Pool T Oper. E Code H NS07 0292308100 1 590100 1 31 777 11,385 594 25,590 352,924 18,417 793,304 NS08 0292306800 1 590100 1 29 959 11,968 75 58,197 347,079 2,186 1,687,699 NS09 0292305200 1 590100 1 31 824 11,958 81 33,570 370,702 2,505 1,040,683 NS13 0292301700 1 590100 1 31 732 4,028 40 9,848 124,880 1,255 305,301 NS14 0292302600 1 590100 1 31 1,014 10,455 215 55,313 324,098 6,670 1,714,695 NS15 0292307300 1 590100 1 31 728 6,313 117 13,658 195,710 3,641 423,390 590100 Northstar Pool Production Totals.......................... 1,715,393 34,674 5,965,072 Form 10-405 Run Date: 01/14/2003 Run Time: 15:51:57 BP Exploration (Alaska) Inc. Well API T Field M Days Name Number y & E In so- P Pool T Oper. E Code H NS10 0292298500 5 590036 9 31 590036 Pool Injection Totals...................... NS27 0292300300 4 590100 NS29 0292300500 4 590100 NS31 0292300900 4 590100 590100 Pool Injection Totals...................... 7 7 7 N1 Gathering Center Totals.......................................... Field Injection Total................................................................................ Form 10-406 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Injection Report 20 AAC 25.432 Northstar Tubing Pressure Max Average PSIG PSIG 1,107.28 980.90 31 31 31 5,649.80 5,788.85 5,726.09 5,081.50 5,177.90 5,151.20 Northstar Casing Pressure Max Average PSIG PSIG 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Daily Average Injection Liquid Gas BBL MCF 2,496 o o o 83,176 59,723 101,571 Page 1 December, 2002 Total Monthly Injection Liquid Gas BBL MCF o 77,386 0 77,386 0 0 2,578,480 0 1,851,430 0 3,148,727 0 7,578,637 77,386 7,578,637 77,386 7,578,637