FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
Disposition
Volume MCF'
1. Sold Fuel 14,609
NGL 135,091
To Badami 0
2. Reinjected 11,700,435
3. Flared or vented less than 1 hour 3,665
4. Flared or vented greater than 1 hour 6,394 V
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge 10,199
6. Used for lease operations Assist 23,343
Fuel 1 126033
7. Other 0
TOTAL items 1-7 13,019,769
8. NGL gas equivalent produced 135,091
9. Purchased gas
10. Transferred from:
11. Transferred to:
Signature
foregoing is true and correct to the best of my knowledge.
Title ýVl-&(L ì ~ K Date ¿/ ~ (0"3
Delta, Eider
Month/Year of Disposition
Jan-03
'Indicate contribution of each pool to total.
Pool Name voae Percent
Endicott 220100 97.32%
Saa Delta 220150 0.13%
Eider 220165 2.55%
1. Safety
b,.314 MCF Ã j2--
2. Lease
MCF
3. Conserv. Purposes
MCF
f0 ~Á:.J.. J/ðtlrg
commis2ner Date' (
Note: All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60 degrees F. Report due
by the 20th of the month folowing the
month of disposition. Authority 20 AAC
25.235.
Beginning with Jan 2003, Endicott, Sag Delta, and Eider Participating Areas are combined on one form.
Form 10-422
Rev. 4/95
2/6/2003
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT· ENDICOTT
Jan-2003
Page 1
lunplanned Events less than or equal to 1 hour
DATE TIME VOLUME
TOTAL 3,665
DESCRIPTION OF'INCIDENTé&: CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
IUnplanned Events greater than 1 hour
DATE TIME VOLUME
1/18/2003 1810-2110 4620
1/20/2003 1300-1630 324
1/24/2003 1020-0000 911
1/25/2003 0000-0510 297
1/27/2003 1310-1910 242
TOTAL 6,394
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
TOTAL
DESCRIPTION OF INCIDENT &: CAUSE
Plant SID - Close SDV due to DCS com failure
MI compressor startup
MI compressor startup
MI compressor startup
MI compressor startup
ACTIONJAK!;t4TQJ;LIMINATECAUSE
Secure plant. Fixed DCS control logic.
Started MI compressor
Started MI compressor
Started MI compressor
Started MI compressor
ACTION TAKEN TO ELIMINATE CAUSE
o
ACTION TAKEN TO ELIMINATE CAUSE
~Planned Events Exceeding 1 Hour OR Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
TOTAL
Volume flared less than 1 hr
Volume flared greater than
1 hr
Pilot Purge
Assist Gas
TOTAL FLARED VOLUME
0
TOTAL EIDR SDN ENDICOTT
3,665 93 5 3,567
6,394 163 8 6,223
10,199 260 13 9,926
~ ~ 29 22.Z.1a
43,601 1,111 55 42,435
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Disposition
Operator
BP Exploration (Alaska) Inc.
Volume MCF'
Delta, Eider
Month/Year of Disposition
Feb-03
Facility
Endicott
'Indicate contribution of each pool to total.
1. Sold
Fuel
NGL
To Badami
13,571
121,348
o
10,416,446
Pool Name o e Percent
Endicott 220100 97.29%
Sa Delta 220150 0.06%
Eider 220165 2.64%
2. Reinjected
3. Flared or vented less than 1 hour
3,317
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235)
1,722
1. Safety
I 7 l..z-- MCF ....:f.M---
5. Pilot and Purge
9,212
6. Used for lease operations
Assist
Fuel
21,032
1 045 094
o
7. Other
2. Lease
MCF
TOTAL items 1-7
11,631,742
3. Conserv. Purposes
MCF
8. NGL gas equivalent produced
121,348
9. Purchased gas
i~4.oi )J
4v( f! 1i/03
Date
Commissioner
10. Transferred from:
11. Transferred to:
I hereby ce~ that the
Signature {¿. Lt.
Title 1\I\,~e1.. i Ax Date 3JI7./0 3
Note: All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60 degrees F. Report due
by the 20th of the month folowing the
month of disposition. Authority 20 AAC
25.235.
Beginning with Jan 2003, Endicott, Sag Delta, and Eider Participating Areas are combined on one form.
Form 1 0-422
Rev. 4/95
3/10/2003
IUnplanned Events less than or equal to 1 hour
DATE TIME VOLUME
TOTAL 3,317
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
Feb-2003
Page 1
DESCRIPTION OF INCIDENT & CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
lunPlanned Events greater than 1 hour
DATE TIME VOLUME
2/13/2003 0850-11 00 1 035
2/9/2003 1510-1730 687
TOTAL 1,722
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTIONTAKENTOEL.IMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL 0
DESCRIPTION OF INCIDENT & CAUSE
A MGC suction valve closed
MI Compressor Startup Attempt
ACTION TAKENTOEL.IMINATE CAUSE
Stablized Plant.
Shut MI Compressor down
ACTION TAKEN TO ELIMINATE CAUSE
Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT &: CAUSE
TOTAL
0
TOTAL EIDR
3,317 88
1,722 ~ 45
9,212 243
2.L.QJ2 552
35,283 932
Volume flared less than 1 hr
Volume flared greater than
1 hr
Pilot Purge
Assist Gas
TOTAL FLARED VOLUME
ACTION TAKEN TO ELIMINATE CAUSE
SDN
2
6
.1A
23
ENDICOTT
3,227
1,676
8,963
2M22
34,328
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
Disposition
1. Sold
2. Reinjected
3. Flared or vented less than 1 hour
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge
6. Used for lease operations
7. Other
TOTAL items 1-7
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to:
Fuel
NGL
To Badami
Assist
Fuel
Alaska) Inc.
Volume MCF'
14,734
136,503
o
11,531,693
1,086
1,262
10,199
23,663
1 149663
o
12,868,803
136,503
Signature
true and correct to the best of my knowledge.
Title M6et TAx Date
Delta, Eider
Month/Year of Disposition
Mar-03
'Indicate contribution of each pool to total.
Pool Name o e Percent
Endicott 220100 97.41%
Sa Delta 220150 0.05%
Eider 220165 2.54%
1. Safety
II Zfc Z--- MCFS ~
2. Lease
MCF
3. Conserv. Purposes
MCF
~ JL.-.LiA- J/8(p3
Commissia ef Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60 degrees F. Report due
by the 20th of the month folowing the
month of disposition. Authority 20 AAC
25.235.
Beginning with Jan 2003, Endicott, Sag Delta, and Eider Participating Areas are combined on one form.
Form 1 0-422
Rev. 4/95
4/4/2003
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
Mar-2003
Page 1
Unplanned Events less than or e ual to 1 hour
DATE TIME VOLUME
TOTAL 1,086
Not required for unplanned events which
are less th~n or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
IUnplanned Events greater than 1 hour
DATE TIME VOLUME
3/21/2003 1710-2150 1062
3/21/2003 2250-0000 96
3/22/2003 0000-0200 72
3/30/2003 0530-0630 32
TOTAL 1,262
DESCRIPTIONOFINCIDENT;;&;CAUSE
Module 303 - O-ring failure at injection water line pig launcher
Module 303 - Coring failure at injection water line pig launcher
Module 303 - Coring failure at injection water line pig launcher
B-MGC Shut Down due to failed thermocouple
ACTION TAKEN TO ELIMINATE CAUSE
Taken out of service while cause is under investigation
Taken out of service while cause is under investigation
Taken out of service while cause is under investigation
Override thermo couple, repair at planned plant shutdown
Planned Events Less Than or Equal 1 Hour AND Not Exceedin 5000 Mct
DATE TIME VOLUMEDESCRIPTIONOF'INCIDENT"&1CAUSE
TOTAL
o
Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
TOTAL
0
TOTAL EIDR
1,086 28
1,262 32
10,199 259
.2MQ.a .6.Q1
36,210 920
Volume flared less than 1 hr
Volume flared greater than
1 hr
Pilot Purge
Assist Gas
TOTAL FLARED VOLUME
ACTION TAKEN TO ELIMINATE CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
SDN
1
5
~
20
ENDICOTT
1,057
1,229
9,935
~
35,270
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
Disposition
Operator
BP Exploration (Alaska) Inc.
Volume MCF'
1. Sold Fuel 14,553
NGL 138,780
To Badami 0
2. Reinjected 11 ,053,149
3. Flared or vented less than 1 hour 1,408
4. Flared or vented greater than 1 hour 0
(Supplemental report required-oSee 20 AAC 25.235)
5. Pilot and Purge 9,870
6. Used for lease operations Assist 23,277
Fuel 1 116 592
7. Other 0
TOTAL items 1-7 12,357,629
8. NGL gas equivalent produced 138,780
9. Purchased gas
10. Transferred from:
11. Transferred to:
Signature
Date v
I hereby certify that the foregoing is true and correct to the best of my knowledge.
(1,
Title rnú a "'T'"Ak
Delta, Eider
'Indicate contribution of each pool to total.
Pool Name voae Percent
Endicott 220100 97.34%
Saa Delta 220150 0.04%
Eider 220165 2.62%
1. Safety
MCF
2. Lease
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60 degrees F. Report due
by the 20th of the month folowing the
month of disposition. Authority 20 AAC
25.235.
Beginning with Jan 2003, Endicott, Sag Delta, and Eider Participating Areas are combined on one form.
Form 1 0-422
Rev. 4/95
..
5/6/2003
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
Apr-2003
Page 1
lunplanned Events less than or equal to 1 hour
DATE TIME VOLUME
TOTAL 1,408
DESCRIPTION OF INCIDENT & CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
lunplanned Events greater than 1 hour
DATE TIME VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
TOTAL
o
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
TOTAL
o
~Planned Events Exceeding 1 Hour OR Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
TOTAL
o
Volume flared less than 1 hr 1 ,408 37 1,370
Volume flared greater than 0 0 0 0
1 hr
Pilot Purge 9,870 258 4 9,608
Assist Gas 23.2ll 21Q .G ~
TOTAL FLARED VOLUME 34,555 905 14 33,636
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
Disposition
Operator
BP Exploration (Alaska) Inc.
Volume MCF'
1. Sold Fuel 14,424
NGL 141,764
To Badami 0
2. Reinjected 10,998,487
3. Flared or vented less than 1 hour 2,395
4. Flared or vented greater than 1 hour 879 I
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge 10,199
6. Used for lease operations Assist 24,258
Fuel 1 079 407
7. Other 0
TOTAL items 1-7 12,271,813
8. NGL gas equivalent produced 141,764
9. Purchased gas
10. Transferred from:
11. Transferred to:
Signature
Title f\l\,e:.(L.,Äx Date ~
Delta, Eider
'Indicate contribution of each pool to total.
Pool Name (.;oae Percent
Endicott 220100 97.68%
Saa Delta 220150 0.02%
Eider 220165 2.30%
1 . Safety tJ 1 &1 MCF 3-
2. Lease MCF
3. Conserv. Purposes MCF
Note: All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60 degrees F. Report due
by the 20th of the month folowing the
month of disposition. Authority 20 AAC
25.235.
Beginning with Jan 2003, Endicott, Sag Delta, and Eider Participating Areas are combined on one form.
Form 10-422
Rev. 4/95
6/4/2003
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT· ENDICOTT
May-2003
Page 1
'UnPlanned Events less than or equal to 1 hour
DATE TIME VOLUME
TOTAL 2,395
IUnplanned Events greater than 1 hour
DATE TIME VOLUME
5/3/2003 0310-0440 120
5/3/2003 0710-0830 415
5/3/2003 2030-2150 37
5/4/2003 0340-0500 50
5/26/2003 1250-1610 182
5/31/2003 0220-0320 75
TOTAL 879
DESCRIPTION OF INCIDENT & CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
DESCRIPTIONOFINCIDENT·S,·CAUSE
A main gas compressor maintenance
A main gas compressor maintenance
B main gas compressor maintenance
B main gas compressor control issues
MI compressor shut down
Booster shut down
ACTION TAKEN TO ELIMINATE CAUSE
Shut in additional wells to stabilize plant
Shut in additional wells to stabilize plant
Stabilize plant
Stabilize plant
Shut the MI Compressor down and stabilize plant
Stabilize plant
~Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCf!!P'T!QN!QF!!INCIPENT,!.s,cAuSE
TOTAL
o
ACTJQN TAKI;NTO ELIMINATE CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
'Planned Events Exceeding 1 Hour OR Exceedin~ 5000 Met
DATE TIME VOLUME DESCRIPTION OF INCIDENT &: CAUSE
TOTAL
Volume flared less than 1 hr
Volume flared greater than
1 hr
Pilot Purge
Assist Gas
TOTAL FLARED VOLUME
0
TOTAL ENDICOTT
2,395 55 ° 2,340
879 20 0 859
10,199 235 2 9,962
~ ~ ~ ~
37,731 869 7 36,855
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
Disposition
Operator
BP Exploration (Alaska) Inc.
Volume MCF'
1. Sold Fuel 13,564
NGL ,t¡.O pT~ 137,30g
To Badami
2. Reinjected 10,635,021
3. Flared or vented less than 1 hour 4,347
4. Flared or vented greater than 1 hour 2,257 /
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge 9,870
6. Used for lease operations Assist \Ö14'~ 22,681
Fuel 1 051 481
7. Other 0
TOTAL items 1-7 11 ,876,529
8. NGL gas equivalent produced 137,308
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby ce~ that t e foregoing is true and correct to the best of my knowledge.
Signature fia. Title vvt.GfL -rAK Date 7(403
Delta, Eider
Month/Year of Disposition
Jun-03
'Indicate contribution of each pool to total.
Pool Name vooe Percent
Endicott 220100 98.01 %
Sao Delta 220150 0.04%
Eider 220165 1.95%
1. Safety
¿; 2.'77 MCF 513#/
2. Lease
MCF
3. Conserv. Purposes
MCF
Note: All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60 degrees F. Report due
by the 20th of the month folowing the
month of disposition. Authority 20 AAC
25.235.
Beginning with Jan 2003, Endicott, Sag Delta, and Eider Participating Areas are combined on one form.
Form 10-422
Rev. 4/95
7/10/2003
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
Jun-2003
Page 1
Unplanned Events less than or equal to 1 hour
TOTAL
4,347
Not required for unplanned events which
are less than or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
Complete plant SID due to injection water pump 1802 SID on controller
problem
Complete plant SID due to injection water pump 1802 SID on controller
problem
MI compressor tripped during software upgrades / programming problems
MI compressor tripped during software upgrades / programming problems
MI compressor tripped during software upgrades / programming problems
Replaced control panel.
6/9/2003 1130-2330 1283
6/10/2003 1340-1740 394
6/26/2003 1720-1920 298
6/29/2003 1630-1730 159
6/30/2003 1100-1210 123
TOTAL 2,257
Replaced control panel.
Resolved programming problems
Resolved programming problems
Resolved programming problems
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
TOTAL
o
TOTAL
o
Volume flared less than 1 hr 4,347 85 2 4,260
Volume flared greater than 2,257 44 2,212
1 hr
Pilot Purge 9,870 193 4 9,673
Assist Gas 22..6.8.1 ~ ~ ~
TOTAL FLARED VOLUME 39,155 765 16 38,374
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
Disposition
Volume MCF'
1. Sold Fuel 14,523
NGL If" Á1t.P01,776
To Badami
.
2. Reinjected 10,064,828
3. Flared or vented less than 1 hour 1 ,453
4. Flared or vented greater than 1 hour <'. f &<. 11 ,1 03 ¡/
(Supplemental report required-oSee 20 AAC 25.235)
5. Pilot and Purge 10,199
6. Used for lease operations Assist I~ ):2. '" ~ / 23,726
Fuel ð 3 997 305
7. Other 0
TOTAL items 1-7 11 ,224,908
8. NGL gas equivalent produced 101,771
9. Purchased gas
10. Transferred from:
11. Transferred to:
Signature
Title Mbll. '1ìOc>< Date
ð/I:5'/O'7:.
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Delta, Eider
Month/Year of Disposition
Jul-03
'Indicate contribution of each pool to total.
Pool Name voae Percent
Endicott 220100 97.69%
Sag Delta 220150 0.00%
Eider 220165 2.31%
1. Safety
MCF (fß~'
2. Lease
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60 degrees F. Report due
by the 20th of the month folowing the
month of disposition. Authority 20 AAC
25.235.
Beginning with Jan 2003, Endicott, Sag Delta, and Eider Participating Areas are combined on one form.
Form 1 0-422
Rev. 4/95
...
8/8/2003
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
Jul-2003
Page 1
¡Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME
TOTAL 1,453
DESCRIPTION OF INblDENT & CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
, ACTION TAKEN TO ELIMII'lATE ,CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
~UnPlanned Events greater than 1 hour
'IjAtI:TIMI: VolEl.1MI:
07/01/03 05:40-07:20 287
07/01/03 08:00-11 :30 48
07/17/03 00:00-00:00 1277
07/18/03 00:00-05:10 377
07/18/03 06:40-22:00 _449
07/19/03 00:00-00:00 1305
07/20/03 00:00-20:20 1202
07/20/03 20:40-00:00 421
07/21/03 00:00-02:40 -' 428
07/21/03 04:50-06:10 30
07/21/03 12:30-00:00 2342
07/22/03 00:00-02:40 410
07/22/03 08:00-12:20 133
07/22/03 13:00-18:50 277
07/24/03 09:10-13:20 65
TOTAL 9,051
ølË$~~!P'TIONOJ?INCIDI:NT&:CAtJS.1:
MI compressor shut down on leaking PSV
MI compressor shut down on leaking PSV
Module 303 NGL and MI Skid PM's - work schedule overruns.
Module 303 NGL and MI Skid PM's - work schedule overruns.
Module 303 NGL and MI Skid PM's - work schedule overruns.
Module 303 NGL and MI Skid PM's - work schedule overruns.
Module 303 NGL and MI Skid PM's - work schedule overruns.
Module 303 NGL and MI Skid PM's - work schedule overruns.
MI compressor shut down on high ambient temperatures.
MI compressor shut down on high ambient temperatures.
MI compressor shut down on high ambient temperatures.
MI compressor shut down on high ambient temperatures.
MI compressor shut down on high ambient temperatures.
MI compressor shut down on high ambient temperatures.
MI compressor shut down on high ambient temperatures.
Ä~.'tjQ!\I;TÄ~~'totlË!f;IM.!!\I'ÄTI:'CAUS.I:;'"
Repaired leaking PSV
Repaired leaking PSV
Completed preventative maintenance.
Completed preventative maintenance.
Completed preventative maintenance.
Completed preventative maintenance.
Completed preventative maintenance.
Completed preventative maintenance.
¡Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Met
DATI: ' , , , TIME VOIEUME' , DI:SCRIP'TION OJ? INCIDENt &: CAUSE ,
TOTAL
o
ACTION TAKEN TO I:LlMINATE CAUSE
¡Planned Events Exceeding 1 Hour OR Exceeding 5000 Met
ºA'I't: TIME VOLUME º!?l?ci'lIIi':TIOI'lCof'lNclº!?Þi'fcB.;P.Aul?!?
07/12/03 00:10-00:00 405 Module 303 NGL and MI Skid PM's
07/13/03 00:00-00:00 71 Module 303 NGL and MI Skid PM's
07/14/03 00:00-00:00 91 Module 303 NGL and MI Skid PM's & Water System PM's at SOl and Mod 401
07/15/03 00:00-09:30 247 Module 303 NGL and MI Skid PM's & Water System PM's at SOl and Mod 399
07/15/03 17:50-00:00 130 Module 303 NGL and MI Skid PM's & Water System PM's at SOl and Mod 400
07/16/03 00:00-00:00 1,108 Module 303 NGL and MI Skid PM's & Water System PM's at SOl and Mod 401
TOTAL 2,052
'ACTIONTAKEN TO ELIMINATE CAUSE
Completed preventative maintenance.
Completed preventative maintenance.
Completed preventative maintenance.
Completed preventative maintenance.
Completed preventative maintenance.
Completed preventative maintenance.
Volume flared less than 1 hr 1 ,453 34 0 1,419
Volume flared greater than 11,103 256 0 10,847
1 hr
Pilot Purge 10,199 236 0 9,963
Assist Gas 2U26. Ma º 23J.l8.
TOTAL FLAREO VOLUME 46,481 1,074 0 45,407
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
Disposition
Volume MCF'
1. Sold Fuel 14,455
NGL I i.f() 4 7/126,01~
To Badami
2. Reinjected 10,297,075
3. Flared or vented less than 1 hour 974
4. Flared or vented greater than 1 hour 1,412 ¡/"
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge 10,199
6. Used for lease operations Assist '001 g~,953
Fuel 1 044 905
7. Other 0
TOTAL items 1-7 11,517,989
8. NGL gas equivalent produced 126,016
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature (). 0 _ ilA ~ ..I... Title fVl.6 r¿. í1"<->< Date 'r Þ/ö :3
Delta, Eider
'Indicate contribution of each pool to total.
Pool Name voce Percent
Endicott 220100 97.45%
Saa Delta 220150 0.00%
Eider 220165 2.55%
1. Safety
IA(l..-MCF
2. Lease
MCF
3. Conserv. Purposes
MCF
c~
ommlssloner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60 degrees F. Report due
by the 20th of the month folowing the
month of disposition. Authority 20 AAC
25.235.
Beginning with Jan 2003, Endicott, Sag Delta, and Eider Participating Areas are combined on one form.
Form 1 0-422
Rev. 4/95
,,:}ß,a---
..
9/8/2003
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
Aug-2003
Page 1
Unplanned Events less than or equal to 1 hour
TOTAL
974
Not required for unplanned events which
are less than or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
I/.. _8/14/2003
'If 8/15/2003
~ 8/15/2003
8/15/2003
8/22/2003
8/22/2003
8/23/2003
1350-1500
1300-1400
1640-1740
1900-0000
1030-1200
1810-0000
0000-0340
TOTAL
325
98
91
308
106
360
124
1,412
Control system ground fault on 'A' and 'B' Main Gas Compressors
Control system ground fault on 'A' and 'B' Main Gas Compressors
Control system ground fault on 'A' and 'B' Main Gas Compressors
Control system ground fault on 'A' and 'B' Main Gas Compressors
Short in wiring for DCS power supply caused shut down.
Short in wiring for DCS power supply caused shut down.
Short in wiring for DCS power supply caused shut down.
~Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME ... VOLUNiiE..DE$CRIPTIPN OFIN.CIDENl'BtCAUSE
Repaired short in wiring
Repaired short in wiring
Repaired short in wiring
Repaired short in wiring
Repaired wiring
Repaired wiring
Repaired wiring
TOTAL
o
Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE " ...,.".'" TIME ,..'" VPLUME , ' " " DESCRIPTlpNOF INCIDENT & CAUSE"
ACTION TAI(EN TOiE.LIMINATEÇAUSË
TOTAL
o
< ACTION TAI(EN TO ELIMINATE CAIJSE
Volume flared less than 1 hr 974 25 0 949
Volume flared greater than 1,412 36 0 1,376
1 hr
Pilot Purge 10,199 260 0 9,939
Assist Gas 22.953 ~ º 22,368
TOTAL FLARED VOLUME 35,538 906 0 34,632
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
Delta, Eider
Disposition
Volume MCF'
'Indicate contribution of each pool to total.
1. Sold
Fuel
NGL
To Badami
13,568
113,115
o
9,020,335
Pool Name o e Percent
Endicott 220100 97.46%
Sa Delta 220150 0.03%
Eider 220165 2.50%
2. Reinjected
3. Flared or vented less than 1 hour
1,128
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235)
1,536
5. Pilot and Purge
9,870
6. Used for lease operations
Assist
Fuel
22,517
946 402
7. Other
1. Safety
153io MCF CSBr:--
o
2. Lease
MCF
TOTAL items 1-7
10,128,471
8. NGL gas equivalent produced
3. Conserv. Purposes
MCF
113,115
II;/tI/3
Dáte .
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Title rw-6 f'l..- ~ Date 10 c,
Note: All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60 degrees F. Report due
by the 20th of the month folowing the
month of disposition. Authority 20 AAC
25.235.
Signature
Beginning with Jan 2003, Endicott, Sag Delta, and Eider Participating Areas are combined on one form.
Form 1 0-422
Rev. 4/95
10/6/2003
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
Sep-2003
Page 1
lunplanned Events less than or equal to 1 hour
DATE TIME VOLUME
TOTAL 139
DESCRIPTIONOFINCIDENT&CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
IUnplanned Events greater than 1 hour
DATE TIME VOLUME
9/9/2003 2110-2230 63
TOTAL 63
DESCRIPTION OF INCIDENT & CAUSE
Broken belt on fin fan cooler on booster gas compressor
ACTION TAKEN TO ELIMINATE CAUSE
Installed new belt
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCI DENT & CAUSE
9/26/2003 00:50-00:50 2
9/26/2003 01 :20-01 :20 48
ACTION TAKEN TO ELIMINATE CAUSE
9/26/2003 01 :40-01 :50 117
9/26/2003 04:30-04:30 20
9/26/2003 04:50-04:50 12
9/26/2003 11 :40-11 :40 14
9/26/2003 22:20-23:00 292
9/27/2003 02:20-02:20 36
9/27/2003 03:00-03:00 46
9/27/2003 03:40-03:40 65
9/28/2003 03:40-03:40 27
9/28/2003 04:40-04:40 18
9/28/2003 05:20-05:40 184
9/28/2003 08:00-08: 1 0 43
9/29/2003 13:30-13:30 13
9/29/2003 17:10-17:20 14
9/29/2003 20:50-20:50 4
9/30/2003 05:50-05:50 32
9/30/2003 06:10-06:10 2
TOTAL 989
Major plant slowdown / shutdown - maintenance on main
compressors
Planned maintenance
Major plant slowdown / shutdown - maintenance on main
compressors
Planned maintenance
Major plant slowdown / shutdown - maintenance on main
compressors
Planned maintenance
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mct
DATE TIME VOLUME )ESCRIPTfONOFINCIDENT&CAUSE
Major plant slowdown / shutdown - maintenance on main
9/28/2003 0600-0710 348 compressors
Major plant slowdown / shutdown - maintenance on main
9/28/2003 1530-1630 253 compressors
ACTION TAKEN TO ELIMINATE CAUSE
Planned maintenance
Planned maintenance
· .
10/6/2003
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
Sep-2003
Page 2
9/29/2003 0740-0920
TOTAL
Volume flared less than 1 hr
Volume flared greater than
1 hr
Pilot Purge
Assist Gas
TOTAL FLARED VOLUME
872
1,473
Major plant slowdown / shutdown - maintenance on main
compressors
Planned maintenance
TOTAL
1,128
SDN
o
ENDICOTT
1,100
EIDR
28
1,536
39
1 ,496
9,870 247 3 9,620
22.517 5.6.3 8 21,946
35,051 877 12 34,162
[Fwd: Planned Flaring Event at Endicott Facility - 9/4/2003]
Subject: [Fwd: Planned Flaring Event at Endicott Facility - 9/4/2003]
Date: Thu, 04 Sep 2003 10:47:13 -0800
From: Jim Regg <jimJegg@admin.state.ak.us>
Organization: AOGCC
To: Steve McMains <steve_mcmains@admin.state.ak.us>
Subject: Planned Flaring Event at Endicott Facility - 9/4/2003
Date: Thu, 4 Sep 2003 12:25:32 -0500
From: "ACT, ENV Advisor" <ACTENVADVISOR@BP.com>
To: Jim Regg <jimJegg@admin.state.ak.us>
CC: "Cooke, Alison D" <CookeAD@BP.com>,
"END, Operations Lead Tech" <ENDOperationsLeadTech@BP.com>,
"END, Enviro Tech (ACS)" <ENDEnviroTechACS@BP.com>
Jim,
The purpose of this email is to provide a courtesy notification that Endicott is planning to perform some
maintenance on a TK block valve on well 5-01 which will likely cause intermittent flaring throughout the day.
An operator located a failed seal early this morning in the block valve and much of the production facility
will have to be safed out in order to replace the seal. Safe out work will begin this morning and the repair is
expected to be completed this afternoon.
Please contact our office with any questions or concerns regarding this information.
Thanks for your consideration,
-Koreen
Koreen Burrow / Ron Youngs
ACT! Environmental Advisors
Phone: 907-670-3382
Fax: 907-670-3175
Jim Regg <iim regg@admin.state.ak.us>
Petroleum Engineer
AOGCC
Administration
.
.
10f2
9/4/2003 1 :27 PM
[Fwd: 2nd UPDATE: Planned Flaring Event at BP's Endicott Facility - 9/6/2003]
Koreen Burrow I Ron Youngs
ACT! Environmental Advisors
Phone: 907-670-3382
Fax: 907-670-3175
------------------------------------------------------
------------------------------------------------------
Jim,
The purpose of this email is to provide a courtesy notification that Endicott is planning to
perform some maintenance on a TK block valve on well 5-01 which will likely cause intermittent
flaring throughout the day. An operator located a failed seal early this morning in the block
valve and much of the production facility will have to be safed out in order to replace the seal.
Safe out work will begin this morning and the repair is expected to be completed this
afternoon.
Please contact our office with any questions or concerns regarding this information.
Thanks for your consideration,
-Koreen
Koreen Burrow I Ron Youngs
ACT! Environmental Advisors
Phone: 907-670-3382
Fax: 907-670-3175
Jim Regg <iim regg@admin.state.ak.us>
Petroleum Engineer
AOGCC
Administration
t'
20f2
9/8/2003 8:48 AM
[Fwd: 2nd UPDATE: Planned Flaring Event at BP's Endicott Facility - 9/6/2003]
Subject: [Fwd: 2nd UPDATE: Planned Flaring Event at BP's Endicott Facility - 9/6/2003]
Date: Mon, 08 Sep 2003 08:31 :30 -0800
From: Jim Regg <jimJegg@admin.state.ak.us>
Organization: AOGCC
To: Steve McMains <steve_mcmains@admin.state.ak.us>
Subject: 2nd UPDATE: Planned Flaring Event at BP's Endicott Facility - 9/6 /2003
Date: Sat, 6 Sep 2003 12:38:12 -0500
From: "ACT, ENV Advisor" <ACTENVADVISOR@BP.com>
To: Jim Regg <jimJegg@admin.state.ak.us>
CC: "Cooke, Alison D" <CookeAD@BP.com>,
"END, Operations Lead Tech" <ENDOperationsLeadTech@BP.com>,
"END, Enviro Tech (ACS)" <ENDEnviroTechACS@BP.com>
Jim:
The leak from the block valve discussed below has been stopped without the need for a facility shutdown.
Therefore, the reported potential flaring event did not occur. There is going to be a maintenance slowdown at the
BP Endicott facility from September 25 through approximately October 1. During this event, the block valve that
had the leak will be replaced. All feasible attempts will be made during the maintenance slowdown to minimize the
potential for flaring.
If you have any questions regarding this information, please call me at 907-670-3382.
Thanks,
Ron
Koreen Burrow I Ron Youngs
ACT! Environmental Advisors
Phone: 907-670-3382 (Milne Point)
907 -659-6592 (Endicott)
Fax: 907-670-3175
------------------------------------------
------------------------------------------
Jim,
During the safe out and troubleshooting the leaking valve with the manufacturer
representative, the team now feels that the entire valve, rather than just the seal, will need to
be replaced. Therefore, the planned maintenance was not completed today as expected. A
replacement valve is being prepared and tested and we hope to perform the replacement on
9/5 or 9/6. All feasible attempts will be made to minimize prepare the site to minimize the
potential for flaring during the valve replacement.
Thanks for your consideration. Please feel free to contact our office with any questions
regarding this information.
Regards,
-Koreen
I
.
lof2
9/8/2003 8:48 AM
[Fwd: Planned Flaring Event for Endicott Facility]
Subject: [Fwd: Planned Flaring Event for Endicott Facility]
Date: Mon, 22 Sep 2003 08:00:45 -0800
From: Jim Regg <jim_regg@admin.state.ak.us>
Organization: AOGCC
To: Steve McMains <steve_mcmains@admin.state.ak.us>
Subject: Planned Flaring Event for Endicott Facility
Date: Mon, 22 Sep 2003 09:56:40 -0500
From: "ACT, ENV Advisor" <ACTENVADVISOR@BP.com>
To: Jim Regg <jimJegg@admin.state.ak.us>
CC: "END, Maint Lead" <ENDMaintLead@BP.com>,
"END, Enviro Tech (ACS)" <ENDEnviroTechACS@BP.com>
Hello Jim,
The purpose of this email is to provide courtesy notification of planned flaring events scheduled to be
performed at the Endicott Production Facility.
Planned flaring is scheduled to occur in two phases. One on Friday morning and again Sunday morning (Sept
26 and 28). The purpose is for cooling down the turbine internals for water wash. We will shutdown around
midnight and the turbine will cool naturally for about 5-6 hours then in order to complete the cooling we will
crank the cop pus and draw outside air through the turbine to get it to about 184 deg F internally prior to
introducing 150 F deg water for the wash. We do not expect to exceed one hour for either event.
Please feel free to contact our office with any questions or concerns you may have regarding this
information.
-Koreen
Koreen Burrow / Ron Youngs
ACT! Environmental Advisors
Phone: 907-670-3382
Fax: 907-670-3175
Jim Regg <Urn regg@admin.state.ak.us>
Petroleum Engineer
AOGCC
Administration
10f2
9/22/2003 8:45 AM
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
Disposition
Volume MCF'
1. Sold
Fuel
NGL
To Badami
13,815
135,149
o
11,200,167
2. Reinjected
3. Flared or vented less than 1 hour
4. Flared or vented greater than 1 hour
(Supplemental report required-oSee 20 AAC 25.235)
5. Pilot and Purge
10,199
6. Used for lease operations
Assist
Fuel
23,200
1 067136
o
7. Other
TOTAL items 1-7
12,456,333
8. NGL gas equivalent produced
135,149
9. Purchased gas
10. Transferred from:
11. Transferred to:
4,865
1,802
Signature
Title fVt.0tG, ~ Date rzJa/o;>
Delta, Eider
Month/Year of Disposition
Oct-03
'Indicate contribution of each pool to total.
Pool Name o e Percent
Endicott 220100 99.75%
Sa Delta 220150 0.07%
Eider 220165 0.18%
1. Safety
I,Cjpv MCF ð'Pf-
2. Lease
MCF
3. Conserv. Purposes
MCF
Note: All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60 degrees F. Report due
by the 20th of the month folowing the
month of disposition. Authority 20 AAC
25.235.
Beginning with Jan 2003, Endicott, Sag Delta, and Eider Participating Areas are combined on one form.
Form 1 0-422
Rev. 4/95
Revised
12/4/2003
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
Oct-2003
Revised
Page 1
REV1
Unplanned Events less than or equal to 1 hour
TOTAL
4,865
Not required for unplanned events which
are less than or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
SDI tie line slugging.
SDI tie line slugging. P1907 booster pump recirc valve failure.
Attempt to reduce production from high gas slugging
wells on SDI
Attempt to reduce production from high gas slugging
wells on SDI
Attempt to reduce production from high gas slugging
wells on SDI
Replace booster valve on P1907.
10/13/2003 1220-1330 172
10/14/2003 0720-0950 240
10/20/2003 1540-1750 155
10/29/2003 0620-1610 1235
TOTAL 1,802
SDI tie line slugging.
SDI tie line slugging.
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DATE ",TIME ' 'VOLlIME "....'.' , '" DE$CRIP110NOF INCIDEI\IT &CAUS~
o
TOTAL 0
ACTIÖN T À(EN TO EU.,.INÀTE CAUSE
Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Met
DATE "'TIME "" ,. VOLUME> '" < DESCRlpTIOI\I OF INCIDENT & CAUSE
o
TOTAL 0
.,..,. ,~CTIºI\ITA(EN TOELIMINA.TECAUSE .....
Volume flared less than 1 hr 4,865 9 4 4,852
Volume flared greater than 1,802 3 1 1,798
1 hr
Pilot Purge 10,199 19 7 10,173
Assist Gas 23.200 ~ 17 23,141
TOTAL FLARED VOLUME 40,066 73 29 39,964
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
Disposition
Operator
BP Exploration (Alaska
Volume MCF'
1. Sold Fuel 13,997
NGL 128,227
To Badami 0
2. Reinjected 11,103,054
3. Flared or vented less than 1 hour 2,010
4. Flared or vented greater than 1 hour 1,067 ./
(Supplemental report required-oSee 20 AAC 25.235)
5. Pilot and Purge 9,870
6. Used for lease operations Assist 22,465
Fuel 1074615
7. Other 0
TOTAL items 1-7 12,355,305
8. NGL gas equivalent produced 128,227
9. Purchased gas
10. Transferred from:
11. Transferred to:
Signature
true and correct to the best of my knowledge.
Title fVU.o("¿ í~ Date z.. 0
Delta, Eider
Month/Year of Disposition
Nov-03
'Indicate contribution of each pool to total.
Pool Name voue Percent
Endicott 220100 99.68%
Sag Delta 220150 0.04%
Eider 220165 0.27%
1 . Safety
¡,Ob 7 MCF ...:5'Bf-
2. Lease
MCF
Note: All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60 degrees F. Report due
by the 20th of the month following the
month of disposition. Authority 20 AAC
25.235.
Beginning with Jan 2003, Endicott, Sag Delta, and Eider Participating Areas are combined on one form.
Form 1 0-422
Rev. 4/95
12/4/2003
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
Nov-2003
Page 1
Unplanned Events less than or equal to 1 hour
TOTAL
2,010
Not required for unplanned events which
are less than or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
Iunplanned Events greater than 1 hour
q,qq,DATE::qq¡q¡¡:¡¡:¡:¡:¡tttTIME VOEUME,qq:u"m
...-..................,...,...,...,...,-....,...,............-.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,...,.........,.,.,."..-,..-,......-,.,
11/12/2003 2120-2300 113
11/13/2003 0000-0840 769
11/24/2003 0000-0220 185
TOTAL 1,067
, , ""~'ª§§BI~'I'I~f'féI~I5I'f'f~Ifi?:§ll1tlt~~'ªi§t:
Hydrated off 2nd stage cooler
Hydrated off 2nd stage cooler
Hydrated off 2nd stage cooler
q~~m'~f'ftl1~I§f'ftm~Ƨ'ªIMIf'f~'I''ª~~~;§§
Warm up 2nd stage cooler
Warm up 2nd stage cooler
Warm up 2nd stage cooler
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Met
DATE ,TIME ",",' 'VOEUME "" , , ,~ESCRIPTIONOF INCIDENT & CAUSE
o
TOTAL 0
"""" 'ACTIONTAKEN TO ELIMINATE CAUSE " '"
Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Met
',:"DATE TIME ' VQI,;t)ME ': DESCRIPTION QflNCIDENT & CAUSE
o
TOTAL 0
" , ",,:¡;,,' ACTIO",JAKENTOELlMINATECAUSE
Volume flared less than 1 hr 2,010 5 1 2,004
Volume flared greater than 1,067 3 0 1,064
1 hr
Pilot Purge 9,870 27 4 9,839
Assist Gas 22.465 21 ~ 22,395
TOTAL FLARED VOLUME 35,412 96 14 35,302
"
,
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
Alaska) Inc.
Volume MCF'
Disposition
1. Sold
2. Reinjected
3. Flared or vented less than 1 hour
4. Flared or vented greater than 1 hour
(Supplemental report required-oSee 20 AAC 25.235)
5. Pilot and Purge
6. Used for lease operations
7. Other
TOTAL items 1-7
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to:
Fuel
NGL
To Badami
14,468
131,371
o
11,436,946
3,180
727
10,199
Assist
Fuel
23,637
1 102768
o
12,723,296
131,371
Signature
that the foregoing is true and correct to the best of my knowledge.
Title VVv() CL 1AX Date (
Delta, Eider
MonthlY ear of Disposition
Dec-03
'Indicate contribution of each pool to total.
Pool Name o e Percent
Endicott 220100 98.82%
Sa Delta 220150 0.03%
Eider 220165 1.15%
v
1. Safety 727 MCF SBf-
2. Lease MCF
3. Conserv. Purposes MCF
Note: All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60 degrees F. Report due
by the 20th of the month following the
month of disposition. Authority 20 AAC
25.235.
Beginning with Jan 2003, Endicott, Sag Delta, and Eider Participating Areas are combined on one form.
Form 10-422
Rev. 4/95
..
..
1/612004
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT· ENDICOTT
Dec-2003
Page 1
Unplanned Events less than or equal to 1 hour
TOTAL
3,180
Not required for unplanned events which
are less than or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
Iunplanned Events greater than 1 hour
[)AIt;é[' ,,' ""m",t;I ,,'," '" , ,myºa.:YME'
12/9/2003 0600-0700 180
12/20/2003 1800-2000 547
TOTAL 727
""""""'..'.,.'.'.....,',','.,'"X[)g§~R'PI!º~,º¡:¡1f;f~I[)t;NI.I.8(..~A\.I§t;
Row 1 & 2 81 Due to high gas flow.
Plant 81 due to slugging from 8DI tie-line
ACTION TAKEN TO ELIMINATE CAUSE
......_...n...........________,_."_,_,.,..,,..,........,.....____.n..........,..."..,.,.,...,,____.........__..................__..__..__..."."_.......,,...........
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DATE TIME VOL.UME DESCRIPTION OF INCIDENT & CAUSE
o
TOTAL 0
ACTIQNTAKEN TO ELIMINATE CAUSE
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mct
o
TOTAL 0
Volume flared less than 1 hr 3,180 36 1 3,143
Volume flared greater than 727 8 0 719
1 hr
Pilot Purge 10,199 117 3 10,079
Assist Gas 23.637 ill Z 23.359
TOTAL FLARED VOLUME 37,743 432 11 37,300