Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutDIU Endicott / BP Exploration STATE OF AIASKA AOGCC GAS DISPOSITION FILES YEAR: 2003 FACILITY: DIU Endicott OPERATOR: BP EXPLORATION (AIASKA) IN C ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Endicott Disposition Volume MCF' 1. Sold Fuel 14,609 NGL 135,091 To Badami 0 2. Reinjected 11,700,435 3. Flared or vented less than 1 hour 3,665 4. Flared or vented greater than 1 hour 6,394 V (Supplemental report required--See 20 AAC 25.235) 5. Pilot and Purge 10,199 6. Used for lease operations Assist 23,343 Fuel 1 126033 7. Other 0 TOTAL items 1-7 13,019,769 8. NGL gas equivalent produced 135,091 9. Purchased gas 10. Transferred from: 11. Transferred to: Signature foregoing is true and correct to the best of my knowledge. Title ýVl-&(L ì ~ K Date ¿/ ~ (0"3 Delta, Eider Month/Year of Disposition Jan-03 'Indicate contribution of each pool to total. Pool Name voae Percent Endicott 220100 97.32% Saa Delta 220150 0.13% Eider 220165 2.55% 1. Safety b,.314 MCF à j2-- 2. Lease MCF 3. Conserv. Purposes MCF f0 ~Á:.J.. J/ðtlrg commis2ner Date' ( Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Beginning with Jan 2003, Endicott, Sag Delta, and Eider Participating Areas are combined on one form. Form 10-422 Rev. 4/95 2/6/2003 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL NO. 202.4 GAS FLARING INCIDENT REPORT· ENDICOTT Jan-2003 Page 1 lunplanned Events less than or equal to 1 hour DATE TIME VOLUME TOTAL 3,665 DESCRIPTION OF'INCIDENTé&: CAUSE Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour IUnplanned Events greater than 1 hour DATE TIME VOLUME 1/18/2003 1810-2110 4620 1/20/2003 1300-1630 324 1/24/2003 1020-0000 911 1/25/2003 0000-0510 297 1/27/2003 1310-1910 242 TOTAL 6,394 Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE TOTAL DESCRIPTION OF INCIDENT &: CAUSE Plant SID - Close SDV due to DCS com failure MI compressor startup MI compressor startup MI compressor startup MI compressor startup ACTIONJAK!;t4TQJ;LIMINATECAUSE Secure plant. Fixed DCS control logic. Started MI compressor Started MI compressor Started MI compressor Started MI compressor ACTION TAKEN TO ELIMINATE CAUSE o ACTION TAKEN TO ELIMINATE CAUSE ~Planned Events Exceeding 1 Hour OR Exceeding 5000 Mct DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE TOTAL Volume flared less than 1 hr Volume flared greater than 1 hr Pilot Purge Assist Gas TOTAL FLARED VOLUME 0 TOTAL EIDR SDN ENDICOTT 3,665 93 5 3,567 6,394 163 8 6,223 10,199 260 13 9,926 ~ ~ 29 22.Z.1a 43,601 1,111 55 42,435 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Disposition Operator BP Exploration (Alaska) Inc. Volume MCF' Delta, Eider Month/Year of Disposition Feb-03 Facility Endicott 'Indicate contribution of each pool to total. 1. Sold Fuel NGL To Badami 13,571 121,348 o 10,416,446 Pool Name o e Percent Endicott 220100 97.29% Sa Delta 220150 0.06% Eider 220165 2.64% 2. Reinjected 3. Flared or vented less than 1 hour 3,317 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 1,722 1. Safety I 7 l..z-- MCF ....:f.M--- 5. Pilot and Purge 9,212 6. Used for lease operations Assist Fuel 21,032 1 045 094 o 7. Other 2. Lease MCF TOTAL items 1-7 11,631,742 3. Conserv. Purposes MCF 8. NGL gas equivalent produced 121,348 9. Purchased gas i~4.oi )J 4v( f! 1i/03 Date Commissioner 10. Transferred from: 11. Transferred to: I hereby ce~ that the Signature {¿. Lt. Title 1\I\,~e1.. i Ax Date 3JI7./0 3 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Beginning with Jan 2003, Endicott, Sag Delta, and Eider Participating Areas are combined on one form. Form 1 0-422 Rev. 4/95 3/10/2003 IUnplanned Events less than or equal to 1 hour DATE TIME VOLUME TOTAL 3,317 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL NO. 202.4 GAS FLARING INCIDENT REPORT - ENDICOTT Feb-2003 Page 1 DESCRIPTION OF INCIDENT & CAUSE Not required for unplanned events which are less than or equal to 1 hour lunPlanned Events greater than 1 hour DATE TIME VOLUME 2/13/2003 0850-11 00 1 035 2/9/2003 1510-1730 687 TOTAL 1,722 IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTIONTAKENTOEL.IMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour TOTAL 0 DESCRIPTION OF INCIDENT & CAUSE A MGC suction valve closed MI Compressor Startup Attempt ACTION TAKENTOEL.IMINATE CAUSE Stablized Plant. Shut MI Compressor down ACTION TAKEN TO ELIMINATE CAUSE Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mct DATE TIME VOLUME DESCRIPTION OF INCIDENT &: CAUSE TOTAL 0 TOTAL EIDR 3,317 88 1,722 ~ 45 9,212 243 2.L.QJ2 552 35,283 932 Volume flared less than 1 hr Volume flared greater than 1 hr Pilot Purge Assist Gas TOTAL FLARED VOLUME ACTION TAKEN TO ELIMINATE CAUSE SDN 2 6 .1A 23 ENDICOTT 3,227 1,676 8,963 2M22 34,328 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Endicott Disposition 1. Sold 2. Reinjected 3. Flared or vented less than 1 hour 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 5. Pilot and Purge 6. Used for lease operations 7. Other TOTAL items 1-7 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from: 11. Transferred to: Fuel NGL To Badami Assist Fuel Alaska) Inc. Volume MCF' 14,734 136,503 o 11,531,693 1,086 1,262 10,199 23,663 1 149663 o 12,868,803 136,503 Signature true and correct to the best of my knowledge. Title M6et TAx Date Delta, Eider Month/Year of Disposition Mar-03 'Indicate contribution of each pool to total. Pool Name o e Percent Endicott 220100 97.41% Sa Delta 220150 0.05% Eider 220165 2.54% 1. Safety II Zfc Z--- MCFS ~ 2. Lease MCF 3. Conserv. Purposes MCF ~ JL.-.LiA- J/8(p3 Commissia ef Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Beginning with Jan 2003, Endicott, Sag Delta, and Eider Participating Areas are combined on one form. Form 1 0-422 Rev. 4/95 4/4/2003 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL NO. 202.4 GAS FLARING INCIDENT REPORT - ENDICOTT Mar-2003 Page 1 Unplanned Events less than or e ual to 1 hour DATE TIME VOLUME TOTAL 1,086 Not required for unplanned events which are less th~n or equal to 1 hour Not required for unplanned events which are less than or equal to 1 hour IUnplanned Events greater than 1 hour DATE TIME VOLUME 3/21/2003 1710-2150 1062 3/21/2003 2250-0000 96 3/22/2003 0000-0200 72 3/30/2003 0530-0630 32 TOTAL 1,262 DESCRIPTIONOFINCIDENT;;&;CAUSE Module 303 - O-ring failure at injection water line pig launcher Module 303 - Coring failure at injection water line pig launcher Module 303 - Coring failure at injection water line pig launcher B-MGC Shut Down due to failed thermocouple ACTION TAKEN TO ELIMINATE CAUSE Taken out of service while cause is under investigation Taken out of service while cause is under investigation Taken out of service while cause is under investigation Override thermo couple, repair at planned plant shutdown Planned Events Less Than or Equal 1 Hour AND Not Exceedin 5000 Mct DATE TIME VOLUMEDESCRIPTIONOF'INCIDENT"&1CAUSE TOTAL o Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mct DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE TOTAL 0 TOTAL EIDR 1,086 28 1,262 32 10,199 259 .2MQ.a .6.Q1 36,210 920 Volume flared less than 1 hr Volume flared greater than 1 hr Pilot Purge Assist Gas TOTAL FLARED VOLUME ACTION TAKEN TO ELIMINATE CAUSE ACTION TAKEN TO ELIMINATE CAUSE SDN 1 5 ~ 20 ENDICOTT 1,057 1,229 9,935 ~ 35,270 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Endicott Disposition Operator BP Exploration (Alaska) Inc. Volume MCF' 1. Sold Fuel 14,553 NGL 138,780 To Badami 0 2. Reinjected 11 ,053,149 3. Flared or vented less than 1 hour 1,408 4. Flared or vented greater than 1 hour 0 (Supplemental report required-oSee 20 AAC 25.235) 5. Pilot and Purge 9,870 6. Used for lease operations Assist 23,277 Fuel 1 116 592 7. Other 0 TOTAL items 1-7 12,357,629 8. NGL gas equivalent produced 138,780 9. Purchased gas 10. Transferred from: 11. Transferred to: Signature Date v I hereby certify that the foregoing is true and correct to the best of my knowledge. (1, Title rnú a "'T'"Ak Delta, Eider 'Indicate contribution of each pool to total. Pool Name voae Percent Endicott 220100 97.34% Saa Delta 220150 0.04% Eider 220165 2.62% 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Beginning with Jan 2003, Endicott, Sag Delta, and Eider Participating Areas are combined on one form. Form 1 0-422 Rev. 4/95 .. 5/6/2003 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL NO. 202.4 GAS FLARING INCIDENT REPORT - ENDICOTT Apr-2003 Page 1 lunplanned Events less than or equal to 1 hour DATE TIME VOLUME TOTAL 1,408 DESCRIPTION OF INCIDENT & CAUSE Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour lunplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL o Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL o ~Planned Events Exceeding 1 Hour OR Exceeding 5000 Mct DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL o Volume flared less than 1 hr 1 ,408 37 1,370 Volume flared greater than 0 0 0 0 1 hr Pilot Purge 9,870 258 4 9,608 Assist Gas 23.2ll 21Q .G ~ TOTAL FLARED VOLUME 34,555 905 14 33,636 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Endicott Disposition Operator BP Exploration (Alaska) Inc. Volume MCF' 1. Sold Fuel 14,424 NGL 141,764 To Badami 0 2. Reinjected 10,998,487 3. Flared or vented less than 1 hour 2,395 4. Flared or vented greater than 1 hour 879 I (Supplemental report required--See 20 AAC 25.235) 5. Pilot and Purge 10,199 6. Used for lease operations Assist 24,258 Fuel 1 079 407 7. Other 0 TOTAL items 1-7 12,271,813 8. NGL gas equivalent produced 141,764 9. Purchased gas 10. Transferred from: 11. Transferred to: Signature Title f\l\,e:.(L.,Äx Date ~ Delta, Eider 'Indicate contribution of each pool to total. Pool Name (.;oae Percent Endicott 220100 97.68% Saa Delta 220150 0.02% Eider 220165 2.30% 1 . Safety tJ 1 &1 MCF 3- 2. Lease MCF 3. Conserv. Purposes MCF Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Beginning with Jan 2003, Endicott, Sag Delta, and Eider Participating Areas are combined on one form. Form 10-422 Rev. 4/95 6/4/2003 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL NO. 202.4 GAS FLARING INCIDENT REPORT· ENDICOTT May-2003 Page 1 'UnPlanned Events less than or equal to 1 hour DATE TIME VOLUME TOTAL 2,395 IUnplanned Events greater than 1 hour DATE TIME VOLUME 5/3/2003 0310-0440 120 5/3/2003 0710-0830 415 5/3/2003 2030-2150 37 5/4/2003 0340-0500 50 5/26/2003 1250-1610 182 5/31/2003 0220-0320 75 TOTAL 879 DESCRIPTION OF INCIDENT & CAUSE Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour DESCRIPTIONOFINCIDENT·S,·CAUSE A main gas compressor maintenance A main gas compressor maintenance B main gas compressor maintenance B main gas compressor control issues MI compressor shut down Booster shut down ACTION TAKEN TO ELIMINATE CAUSE Shut in additional wells to stabilize plant Shut in additional wells to stabilize plant Stabilize plant Stabilize plant Shut the MI Compressor down and stabilize plant Stabilize plant ~Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCf!!P'T!QN!QF!!INCIPENT,!.s,cAuSE TOTAL o ACTJQN TAKI;NTO ELIMINATE CAUSE ACTION TAKEN TO ELIMINATE CAUSE 'Planned Events Exceeding 1 Hour OR Exceedin~ 5000 Met DATE TIME VOLUME DESCRIPTION OF INCIDENT &: CAUSE TOTAL Volume flared less than 1 hr Volume flared greater than 1 hr Pilot Purge Assist Gas TOTAL FLARED VOLUME 0 TOTAL ENDICOTT 2,395 55 ° 2,340 879 20 0 859 10,199 235 2 9,962 ~ ~ ~ ~ 37,731 869 7 36,855 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Endicott Disposition Operator BP Exploration (Alaska) Inc. Volume MCF' 1. Sold Fuel 13,564 NGL ,t¡.O pT~ 137,30g To Badami 2. Reinjected 10,635,021 3. Flared or vented less than 1 hour 4,347 4. Flared or vented greater than 1 hour 2,257 / (Supplemental report required--See 20 AAC 25.235) 5. Pilot and Purge 9,870 6. Used for lease operations Assist \Ö14'~ 22,681 Fuel 1 051 481 7. Other 0 TOTAL items 1-7 11 ,876,529 8. NGL gas equivalent produced 137,308 9. Purchased gas 10. Transferred from: 11. Transferred to: I hereby ce~ that t e foregoing is true and correct to the best of my knowledge. Signature fia. Title vvt.GfL -rAK Date 7(403 Delta, Eider Month/Year of Disposition Jun-03 'Indicate contribution of each pool to total. Pool Name vooe Percent Endicott 220100 98.01 % Sao Delta 220150 0.04% Eider 220165 1.95% 1. Safety ¿; 2.'77 MCF 513#/ 2. Lease MCF 3. Conserv. Purposes MCF Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Beginning with Jan 2003, Endicott, Sag Delta, and Eider Participating Areas are combined on one form. Form 10-422 Rev. 4/95 7/10/2003 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL NO. 202.4 GAS FLARING INCIDENT REPORT - ENDICOTT Jun-2003 Page 1 Unplanned Events less than or equal to 1 hour TOTAL 4,347 Not required for unplanned events which are less than or equal to 1 hour Not required for unplanned events which are less than or equal to 1 hour Complete plant SID due to injection water pump 1802 SID on controller problem Complete plant SID due to injection water pump 1802 SID on controller problem MI compressor tripped during software upgrades / programming problems MI compressor tripped during software upgrades / programming problems MI compressor tripped during software upgrades / programming problems Replaced control panel. 6/9/2003 1130-2330 1283 6/10/2003 1340-1740 394 6/26/2003 1720-1920 298 6/29/2003 1630-1730 159 6/30/2003 1100-1210 123 TOTAL 2,257 Replaced control panel. Resolved programming problems Resolved programming problems Resolved programming problems Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct TOTAL o TOTAL o Volume flared less than 1 hr 4,347 85 2 4,260 Volume flared greater than 2,257 44 2,212 1 hr Pilot Purge 9,870 193 4 9,673 Assist Gas 22..6.8.1 ~ ~ ~ TOTAL FLARED VOLUME 39,155 765 16 38,374 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Endicott Disposition Volume MCF' 1. Sold Fuel 14,523 NGL If" Á1t.P01,776 To Badami . 2. Reinjected 10,064,828 3. Flared or vented less than 1 hour 1 ,453 4. Flared or vented greater than 1 hour <'. f &<. 11 ,1 03 ¡/ (Supplemental report required-oSee 20 AAC 25.235) 5. Pilot and Purge 10,199 6. Used for lease operations Assist I~ ):2. '" ~ / 23,726 Fuel ð 3 997 305 7. Other 0 TOTAL items 1-7 11 ,224,908 8. NGL gas equivalent produced 101,771 9. Purchased gas 10. Transferred from: 11. Transferred to: Signature Title Mbll. '1ìOc>< Date ð/I:5'/O'7:. I hereby certify that the foregoing is true and correct to the best of my knowledge. Delta, Eider Month/Year of Disposition Jul-03 'Indicate contribution of each pool to total. Pool Name voae Percent Endicott 220100 97.69% Sag Delta 220150 0.00% Eider 220165 2.31% 1. Safety MCF (fß~' 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Beginning with Jan 2003, Endicott, Sag Delta, and Eider Participating Areas are combined on one form. Form 1 0-422 Rev. 4/95 ... 8/8/2003 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL NO. 202.4 GAS FLARING INCIDENT REPORT - ENDICOTT Jul-2003 Page 1 ¡Unplanned Events less than or equal to 1 hour DATE TIME VOLUME TOTAL 1,453 DESCRIPTION OF INblDENT & CAUSE Not required for unplanned events which are less than or equal to 1 hour , ACTION TAKEN TO ELIMII'lATE ,CAUSE Not required for unplanned events which are less than or equal to 1 hour ~UnPlanned Events greater than 1 hour 'IjAtI:TIMI: VolEl.1MI: 07/01/03 05:40-07:20 287 07/01/03 08:00-11 :30 48 07/17/03 00:00-00:00 1277 07/18/03 00:00-05:10 377 07/18/03 06:40-22:00 _449 07/19/03 00:00-00:00 1305 07/20/03 00:00-20:20 1202 07/20/03 20:40-00:00 421 07/21/03 00:00-02:40 -' 428 07/21/03 04:50-06:10 30 07/21/03 12:30-00:00 2342 07/22/03 00:00-02:40 410 07/22/03 08:00-12:20 133 07/22/03 13:00-18:50 277 07/24/03 09:10-13:20 65 TOTAL 9,051 ølË$~~!P'TIONOJ?INCIDI:NT&:CAtJS.1: MI compressor shut down on leaking PSV MI compressor shut down on leaking PSV Module 303 NGL and MI Skid PM's - work schedule overruns. Module 303 NGL and MI Skid PM's - work schedule overruns. Module 303 NGL and MI Skid PM's - work schedule overruns. Module 303 NGL and MI Skid PM's - work schedule overruns. Module 303 NGL and MI Skid PM's - work schedule overruns. Module 303 NGL and MI Skid PM's - work schedule overruns. MI compressor shut down on high ambient temperatures. MI compressor shut down on high ambient temperatures. MI compressor shut down on high ambient temperatures. MI compressor shut down on high ambient temperatures. MI compressor shut down on high ambient temperatures. MI compressor shut down on high ambient temperatures. MI compressor shut down on high ambient temperatures. Ä~.'tjQ!\I;TÄ~~'totlË!f;IM.!!\I'ÄTI:'CAUS.I:;'" Repaired leaking PSV Repaired leaking PSV Completed preventative maintenance. Completed preventative maintenance. Completed preventative maintenance. Completed preventative maintenance. Completed preventative maintenance. Completed preventative maintenance. ¡Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Met DATI: ' , , , TIME VOIEUME' , DI:SCRIP'TION OJ? INCIDENt &: CAUSE , TOTAL o ACTION TAKEN TO I:LlMINATE CAUSE ¡Planned Events Exceeding 1 Hour OR Exceeding 5000 Met ºA'I't: TIME VOLUME º!?l?ci'lIIi':TIOI'lCof'lNclº!?Þi'fcB.;P.Aul?!? 07/12/03 00:10-00:00 405 Module 303 NGL and MI Skid PM's 07/13/03 00:00-00:00 71 Module 303 NGL and MI Skid PM's 07/14/03 00:00-00:00 91 Module 303 NGL and MI Skid PM's & Water System PM's at SOl and Mod 401 07/15/03 00:00-09:30 247 Module 303 NGL and MI Skid PM's & Water System PM's at SOl and Mod 399 07/15/03 17:50-00:00 130 Module 303 NGL and MI Skid PM's & Water System PM's at SOl and Mod 400 07/16/03 00:00-00:00 1,108 Module 303 NGL and MI Skid PM's & Water System PM's at SOl and Mod 401 TOTAL 2,052 'ACTIONTAKEN TO ELIMINATE CAUSE Completed preventative maintenance. Completed preventative maintenance. Completed preventative maintenance. Completed preventative maintenance. Completed preventative maintenance. Completed preventative maintenance. Volume flared less than 1 hr 1 ,453 34 0 1,419 Volume flared greater than 11,103 256 0 10,847 1 hr Pilot Purge 10,199 236 0 9,963 Assist Gas 2U26. Ma º 23J.l8. TOTAL FLAREO VOLUME 46,481 1,074 0 45,407 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Endicott Disposition Volume MCF' 1. Sold Fuel 14,455 NGL I i.f() 4 7/126,01~ To Badami 2. Reinjected 10,297,075 3. Flared or vented less than 1 hour 974 4. Flared or vented greater than 1 hour 1,412 ¡/" (Supplemental report required--See 20 AAC 25.235) 5. Pilot and Purge 10,199 6. Used for lease operations Assist '001 g~,953 Fuel 1 044 905 7. Other 0 TOTAL items 1-7 11,517,989 8. NGL gas equivalent produced 126,016 9. Purchased gas 10. Transferred from: 11. Transferred to: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature (). 0 _ ilA ~ ..I... Title fVl.6 r¿. í1"<->< Date 'r Þ/ö :3 Delta, Eider 'Indicate contribution of each pool to total. Pool Name voce Percent Endicott 220100 97.45% Saa Delta 220150 0.00% Eider 220165 2.55% 1. Safety IA(l..-MCF 2. Lease MCF 3. Conserv. Purposes MCF c~ ommlssloner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Beginning with Jan 2003, Endicott, Sag Delta, and Eider Participating Areas are combined on one form. Form 1 0-422 Rev. 4/95 ,,:}ß,a--- .. 9/8/2003 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL NO. 202.4 GAS FLARING INCIDENT REPORT - ENDICOTT Aug-2003 Page 1 Unplanned Events less than or equal to 1 hour TOTAL 974 Not required for unplanned events which are less than or equal to 1 hour Not required for unplanned events which are less than or equal to 1 hour I/.. _8/14/2003 'If 8/15/2003 ~ 8/15/2003 8/15/2003 8/22/2003 8/22/2003 8/23/2003 1350-1500 1300-1400 1640-1740 1900-0000 1030-1200 1810-0000 0000-0340 TOTAL 325 98 91 308 106 360 124 1,412 Control system ground fault on 'A' and 'B' Main Gas Compressors Control system ground fault on 'A' and 'B' Main Gas Compressors Control system ground fault on 'A' and 'B' Main Gas Compressors Control system ground fault on 'A' and 'B' Main Gas Compressors Short in wiring for DCS power supply caused shut down. Short in wiring for DCS power supply caused shut down. Short in wiring for DCS power supply caused shut down. ~Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME ... VOLUNiiE..DE$CRIPTIPN OFIN.CIDENl'BtCAUSE Repaired short in wiring Repaired short in wiring Repaired short in wiring Repaired short in wiring Repaired wiring Repaired wiring Repaired wiring TOTAL o Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE " ...,.".'" TIME ,..'" VPLUME , ' " " DESCRIPTlpNOF INCIDENT & CAUSE" ACTION TAI(EN TOiE.LIMINATEÇAUSË TOTAL o < ACTION TAI(EN TO ELIMINATE CAIJSE Volume flared less than 1 hr 974 25 0 949 Volume flared greater than 1,412 36 0 1,376 1 hr Pilot Purge 10,199 260 0 9,939 Assist Gas 22.953 ~ º 22,368 TOTAL FLARED VOLUME 35,538 906 0 34,632 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Endicott Delta, Eider Disposition Volume MCF' 'Indicate contribution of each pool to total. 1. Sold Fuel NGL To Badami 13,568 113,115 o 9,020,335 Pool Name o e Percent Endicott 220100 97.46% Sa Delta 220150 0.03% Eider 220165 2.50% 2. Reinjected 3. Flared or vented less than 1 hour 1,128 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 1,536 5. Pilot and Purge 9,870 6. Used for lease operations Assist Fuel 22,517 946 402 7. Other 1. Safety 153io MCF CSBr:-- o 2. Lease MCF TOTAL items 1-7 10,128,471 8. NGL gas equivalent produced 3. Conserv. Purposes MCF 113,115 II;/tI/3 Dáte . 9. Purchased gas 10. Transferred from: 11. Transferred to: I hereby certify that the foregoing is true and correct to the best of my knowledge. Title rw-6 f'l..- ~ Date 10 c, Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Signature Beginning with Jan 2003, Endicott, Sag Delta, and Eider Participating Areas are combined on one form. Form 1 0-422 Rev. 4/95 10/6/2003 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL NO. 202.4 GAS FLARING INCIDENT REPORT - ENDICOTT Sep-2003 Page 1 lunplanned Events less than or equal to 1 hour DATE TIME VOLUME TOTAL 139 DESCRIPTIONOFINCIDENT&CAUSE Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour IUnplanned Events greater than 1 hour DATE TIME VOLUME 9/9/2003 2110-2230 63 TOTAL 63 DESCRIPTION OF INCIDENT & CAUSE Broken belt on fin fan cooler on booster gas compressor ACTION TAKEN TO ELIMINATE CAUSE Installed new belt Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct DATE TIME VOLUME DESCRIPTION OF INCI DENT & CAUSE 9/26/2003 00:50-00:50 2 9/26/2003 01 :20-01 :20 48 ACTION TAKEN TO ELIMINATE CAUSE 9/26/2003 01 :40-01 :50 117 9/26/2003 04:30-04:30 20 9/26/2003 04:50-04:50 12 9/26/2003 11 :40-11 :40 14 9/26/2003 22:20-23:00 292 9/27/2003 02:20-02:20 36 9/27/2003 03:00-03:00 46 9/27/2003 03:40-03:40 65 9/28/2003 03:40-03:40 27 9/28/2003 04:40-04:40 18 9/28/2003 05:20-05:40 184 9/28/2003 08:00-08: 1 0 43 9/29/2003 13:30-13:30 13 9/29/2003 17:10-17:20 14 9/29/2003 20:50-20:50 4 9/30/2003 05:50-05:50 32 9/30/2003 06:10-06:10 2 TOTAL 989 Major plant slowdown / shutdown - maintenance on main compressors Planned maintenance Major plant slowdown / shutdown - maintenance on main compressors Planned maintenance Major plant slowdown / shutdown - maintenance on main compressors Planned maintenance IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mct DATE TIME VOLUME )ESCRIPTfONOFINCIDENT&CAUSE Major plant slowdown / shutdown - maintenance on main 9/28/2003 0600-0710 348 compressors Major plant slowdown / shutdown - maintenance on main 9/28/2003 1530-1630 253 compressors ACTION TAKEN TO ELIMINATE CAUSE Planned maintenance Planned maintenance · . 10/6/2003 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL NO. 202.4 GAS FLARING INCIDENT REPORT - ENDICOTT Sep-2003 Page 2 9/29/2003 0740-0920 TOTAL Volume flared less than 1 hr Volume flared greater than 1 hr Pilot Purge Assist Gas TOTAL FLARED VOLUME 872 1,473 Major plant slowdown / shutdown - maintenance on main compressors Planned maintenance TOTAL 1,128 SDN o ENDICOTT 1,100 EIDR 28 1,536 39 1 ,496 9,870 247 3 9,620 22.517 5.6.3 8 21,946 35,051 877 12 34,162 [Fwd: Planned Flaring Event at Endicott Facility - 9/4/2003] Subject: [Fwd: Planned Flaring Event at Endicott Facility - 9/4/2003] Date: Thu, 04 Sep 2003 10:47:13 -0800 From: Jim Regg <jimJegg@admin.state.ak.us> Organization: AOGCC To: Steve McMains <steve_mcmains@admin.state.ak.us> Subject: Planned Flaring Event at Endicott Facility - 9/4/2003 Date: Thu, 4 Sep 2003 12:25:32 -0500 From: "ACT, ENV Advisor" <ACTENVADVISOR@BP.com> To: Jim Regg <jimJegg@admin.state.ak.us> CC: "Cooke, Alison D" <CookeAD@BP.com>, "END, Operations Lead Tech" <ENDOperationsLeadTech@BP.com>, "END, Enviro Tech (ACS)" <ENDEnviroTechACS@BP.com> Jim, The purpose of this email is to provide a courtesy notification that Endicott is planning to perform some maintenance on a TK block valve on well 5-01 which will likely cause intermittent flaring throughout the day. An operator located a failed seal early this morning in the block valve and much of the production facility will have to be safed out in order to replace the seal. Safe out work will begin this morning and the repair is expected to be completed this afternoon. Please contact our office with any questions or concerns regarding this information. Thanks for your consideration, -Koreen Koreen Burrow / Ron Youngs ACT! Environmental Advisors Phone: 907-670-3382 Fax: 907-670-3175 Jim Regg <iim regg@admin.state.ak.us> Petroleum Engineer AOGCC Administration . . 10f2 9/4/2003 1 :27 PM [Fwd: 2nd UPDATE: Planned Flaring Event at BP's Endicott Facility - 9/6/2003] Koreen Burrow I Ron Youngs ACT! Environmental Advisors Phone: 907-670-3382 Fax: 907-670-3175 ------------------------------------------------------ ------------------------------------------------------ Jim, The purpose of this email is to provide a courtesy notification that Endicott is planning to perform some maintenance on a TK block valve on well 5-01 which will likely cause intermittent flaring throughout the day. An operator located a failed seal early this morning in the block valve and much of the production facility will have to be safed out in order to replace the seal. Safe out work will begin this morning and the repair is expected to be completed this afternoon. Please contact our office with any questions or concerns regarding this information. Thanks for your consideration, -Koreen Koreen Burrow I Ron Youngs ACT! Environmental Advisors Phone: 907-670-3382 Fax: 907-670-3175 Jim Regg <iim regg@admin.state.ak.us> Petroleum Engineer AOGCC Administration t' 20f2 9/8/2003 8:48 AM [Fwd: 2nd UPDATE: Planned Flaring Event at BP's Endicott Facility - 9/6/2003] Subject: [Fwd: 2nd UPDATE: Planned Flaring Event at BP's Endicott Facility - 9/6/2003] Date: Mon, 08 Sep 2003 08:31 :30 -0800 From: Jim Regg <jimJegg@admin.state.ak.us> Organization: AOGCC To: Steve McMains <steve_mcmains@admin.state.ak.us> Subject: 2nd UPDATE: Planned Flaring Event at BP's Endicott Facility - 9/6 /2003 Date: Sat, 6 Sep 2003 12:38:12 -0500 From: "ACT, ENV Advisor" <ACTENVADVISOR@BP.com> To: Jim Regg <jimJegg@admin.state.ak.us> CC: "Cooke, Alison D" <CookeAD@BP.com>, "END, Operations Lead Tech" <ENDOperationsLeadTech@BP.com>, "END, Enviro Tech (ACS)" <ENDEnviroTechACS@BP.com> Jim: The leak from the block valve discussed below has been stopped without the need for a facility shutdown. Therefore, the reported potential flaring event did not occur. There is going to be a maintenance slowdown at the BP Endicott facility from September 25 through approximately October 1. During this event, the block valve that had the leak will be replaced. All feasible attempts will be made during the maintenance slowdown to minimize the potential for flaring. If you have any questions regarding this information, please call me at 907-670-3382. Thanks, Ron Koreen Burrow I Ron Youngs ACT! Environmental Advisors Phone: 907-670-3382 (Milne Point) 907 -659-6592 (Endicott) Fax: 907-670-3175 ------------------------------------------ ------------------------------------------ Jim, During the safe out and troubleshooting the leaking valve with the manufacturer representative, the team now feels that the entire valve, rather than just the seal, will need to be replaced. Therefore, the planned maintenance was not completed today as expected. A replacement valve is being prepared and tested and we hope to perform the replacement on 9/5 or 9/6. All feasible attempts will be made to minimize prepare the site to minimize the potential for flaring during the valve replacement. Thanks for your consideration. Please feel free to contact our office with any questions regarding this information. Regards, -Koreen I . lof2 9/8/2003 8:48 AM [Fwd: Planned Flaring Event for Endicott Facility] Subject: [Fwd: Planned Flaring Event for Endicott Facility] Date: Mon, 22 Sep 2003 08:00:45 -0800 From: Jim Regg <jim_regg@admin.state.ak.us> Organization: AOGCC To: Steve McMains <steve_mcmains@admin.state.ak.us> Subject: Planned Flaring Event for Endicott Facility Date: Mon, 22 Sep 2003 09:56:40 -0500 From: "ACT, ENV Advisor" <ACTENVADVISOR@BP.com> To: Jim Regg <jimJegg@admin.state.ak.us> CC: "END, Maint Lead" <ENDMaintLead@BP.com>, "END, Enviro Tech (ACS)" <ENDEnviroTechACS@BP.com> Hello Jim, The purpose of this email is to provide courtesy notification of planned flaring events scheduled to be performed at the Endicott Production Facility. Planned flaring is scheduled to occur in two phases. One on Friday morning and again Sunday morning (Sept 26 and 28). The purpose is for cooling down the turbine internals for water wash. We will shutdown around midnight and the turbine will cool naturally for about 5-6 hours then in order to complete the cooling we will crank the cop pus and draw outside air through the turbine to get it to about 184 deg F internally prior to introducing 150 F deg water for the wash. We do not expect to exceed one hour for either event. Please feel free to contact our office with any questions or concerns you may have regarding this information. -Koreen Koreen Burrow / Ron Youngs ACT! Environmental Advisors Phone: 907-670-3382 Fax: 907-670-3175 Jim Regg <Urn regg@admin.state.ak.us> Petroleum Engineer AOGCC Administration 10f2 9/22/2003 8:45 AM ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Endicott Disposition Volume MCF' 1. Sold Fuel NGL To Badami 13,815 135,149 o 11,200,167 2. Reinjected 3. Flared or vented less than 1 hour 4. Flared or vented greater than 1 hour (Supplemental report required-oSee 20 AAC 25.235) 5. Pilot and Purge 10,199 6. Used for lease operations Assist Fuel 23,200 1 067136 o 7. Other TOTAL items 1-7 12,456,333 8. NGL gas equivalent produced 135,149 9. Purchased gas 10. Transferred from: 11. Transferred to: 4,865 1,802 Signature Title fVt.0tG, ~ Date rzJa/o;> Delta, Eider Month/Year of Disposition Oct-03 'Indicate contribution of each pool to total. Pool Name o e Percent Endicott 220100 99.75% Sa Delta 220150 0.07% Eider 220165 0.18% 1. Safety I,Cjpv MCF ð'Pf- 2. Lease MCF 3. Conserv. Purposes MCF Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Beginning with Jan 2003, Endicott, Sag Delta, and Eider Participating Areas are combined on one form. Form 1 0-422 Rev. 4/95 Revised 12/4/2003 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL NO. 202.4 GAS FLARING INCIDENT REPORT - ENDICOTT Oct-2003 Revised Page 1 REV1 Unplanned Events less than or equal to 1 hour TOTAL 4,865 Not required for unplanned events which are less than or equal to 1 hour Not required for unplanned events which are less than or equal to 1 hour SDI tie line slugging. SDI tie line slugging. P1907 booster pump recirc valve failure. Attempt to reduce production from high gas slugging wells on SDI Attempt to reduce production from high gas slugging wells on SDI Attempt to reduce production from high gas slugging wells on SDI Replace booster valve on P1907. 10/13/2003 1220-1330 172 10/14/2003 0720-0950 240 10/20/2003 1540-1750 155 10/29/2003 0620-1610 1235 TOTAL 1,802 SDI tie line slugging. SDI tie line slugging. Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct DATE ",TIME ' 'VOLlIME "....'.' , '" DE$CRIP110NOF INCIDEI\IT &CAUS~ o TOTAL 0 ACTIÖN T À (EN TO EU.,.INÀTE CAUSE Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Met DATE "'TIME "" ,. VOLUME> '" < DESCRlpTIOI\I OF INCIDENT & CAUSE o TOTAL 0 .,..,. ,~CTIºI\ITA (EN TOELIMINA.TECAUSE ..... Volume flared less than 1 hr 4,865 9 4 4,852 Volume flared greater than 1,802 3 1 1,798 1 hr Pilot Purge 10,199 19 7 10,173 Assist Gas 23.200 ~ 17 23,141 TOTAL FLARED VOLUME 40,066 73 29 39,964 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Endicott Disposition Operator BP Exploration (Alaska Volume MCF' 1. Sold Fuel 13,997 NGL 128,227 To Badami 0 2. Reinjected 11,103,054 3. Flared or vented less than 1 hour 2,010 4. Flared or vented greater than 1 hour 1,067 ./ (Supplemental report required-oSee 20 AAC 25.235) 5. Pilot and Purge 9,870 6. Used for lease operations Assist 22,465 Fuel 1074615 7. Other 0 TOTAL items 1-7 12,355,305 8. NGL gas equivalent produced 128,227 9. Purchased gas 10. Transferred from: 11. Transferred to: Signature true and correct to the best of my knowledge. Title fVU.o("¿ í~ Date z.. 0 Delta, Eider Month/Year of Disposition Nov-03 'Indicate contribution of each pool to total. Pool Name voue Percent Endicott 220100 99.68% Sag Delta 220150 0.04% Eider 220165 0.27% 1 . Safety ¡,Ob 7 MCF ...:5'Bf- 2. Lease MCF Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Beginning with Jan 2003, Endicott, Sag Delta, and Eider Participating Areas are combined on one form. Form 1 0-422 Rev. 4/95 12/4/2003 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL NO. 202.4 GAS FLARING INCIDENT REPORT - ENDICOTT Nov-2003 Page 1 Unplanned Events less than or equal to 1 hour TOTAL 2,010 Not required for unplanned events which are less than or equal to 1 hour Not required for unplanned events which are less than or equal to 1 hour Iunplanned Events greater than 1 hour q,qq,DATE::qq¡q¡¡:¡¡:¡:¡:¡tttTIME VOEUME,qq:u"m ...-..................,...,...,...,...,-....,...,............-.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,...,.........,.,.,."..-,..-,......-,., 11/12/2003 2120-2300 113 11/13/2003 0000-0840 769 11/24/2003 0000-0220 185 TOTAL 1,067 , , ""~'ª§§BI~'I'I~f'féI~I5I'f'f~Ifi?:§ll1tlt~~'ªi§t: Hydrated off 2nd stage cooler Hydrated off 2nd stage cooler Hydrated off 2nd stage cooler q~~m'~f'ftl1~I§f'ftm~Ƨ'ªIMIf'f~'I''ª~~~;§§ Warm up 2nd stage cooler Warm up 2nd stage cooler Warm up 2nd stage cooler Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Met DATE ,TIME ",",' 'VOEUME "" , , ,~ESCRIPTIONOF INCIDENT & CAUSE o TOTAL 0 """" 'ACTIONTAKEN TO ELIMINATE CAUSE " '" Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Met ',:"DATE TIME ' VQI,;t)ME ': DESCRIPTION QflNCIDENT & CAUSE o TOTAL 0 " , ",,:¡;,,' ACTIO",JAKENTOELlMINATECAUSE Volume flared less than 1 hr 2,010 5 1 2,004 Volume flared greater than 1,067 3 0 1,064 1 hr Pilot Purge 9,870 27 4 9,839 Assist Gas 22.465 21 ~ 22,395 TOTAL FLARED VOLUME 35,412 96 14 35,302 " , ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Endicott Alaska) Inc. Volume MCF' Disposition 1. Sold 2. Reinjected 3. Flared or vented less than 1 hour 4. Flared or vented greater than 1 hour (Supplemental report required-oSee 20 AAC 25.235) 5. Pilot and Purge 6. Used for lease operations 7. Other TOTAL items 1-7 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from: 11. Transferred to: Fuel NGL To Badami 14,468 131,371 o 11,436,946 3,180 727 10,199 Assist Fuel 23,637 1 102768 o 12,723,296 131,371 Signature that the foregoing is true and correct to the best of my knowledge. Title VVv() CL 1AX Date ( Delta, Eider MonthlY ear of Disposition Dec-03 'Indicate contribution of each pool to total. Pool Name o e Percent Endicott 220100 98.82% Sa Delta 220150 0.03% Eider 220165 1.15% v 1. Safety 727 MCF SBf- 2. Lease MCF 3. Conserv. Purposes MCF Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Beginning with Jan 2003, Endicott, Sag Delta, and Eider Participating Areas are combined on one form. Form 10-422 Rev. 4/95 .. .. 1/612004 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL NO. 202.4 GAS FLARING INCIDENT REPORT· ENDICOTT Dec-2003 Page 1 Unplanned Events less than or equal to 1 hour TOTAL 3,180 Not required for unplanned events which are less than or equal to 1 hour Not required for unplanned events which are less than or equal to 1 hour Iunplanned Events greater than 1 hour [)AIt;é[' ,,' ""m",t;I ,,'," '" , ,myºa.:YME' 12/9/2003 0600-0700 180 12/20/2003 1800-2000 547 TOTAL 727 """"""'..'.,.'.'.....,',','.,'"X[)g§~R'PI!º~,º¡:¡1f;f~I[)t;NI.I.8(..~A\.I§t; Row 1 & 2 81 Due to high gas flow. Plant 81 due to slugging from 8DI tie-line ACTION TAKEN TO ELIMINATE CAUSE ......_...n...........________,_."_,_,.,..,,..,........,.....____.n..........,..."..,.,.,...,,____.........__..................__..__..__..."."_.......,,........... Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct DATE TIME VOL.UME DESCRIPTION OF INCIDENT & CAUSE o TOTAL 0 ACTIQNTAKEN TO ELIMINATE CAUSE Planned Events Exceeding 1 Hour OR Exceeding 5000 Mct o TOTAL 0 Volume flared less than 1 hr 3,180 36 1 3,143 Volume flared greater than 727 8 0 719 1 hr Pilot Purge 10,199 117 3 10,079 Assist Gas 23.637 ill Z 23.359 TOTAL FLARED VOLUME 37,743 432 11 37,300