YEAR: 2003
FACILITY: KRU CPF 1
OPERATOR: CONOCOPHILLIPS
ALASKAINC
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
CENTRAL PROCESSING FACILITY #1
Operator
CONOCOPHILLIPS ALASKA, INC.
Field( s)
KUPARUK RIVER UNIT
MonthlY ear of Disposition
1/03
Disposition Volume MCF*
1. Sold 12.203
2. Reinjected 2,360,233
3. Flared or vented less than I hour 6,898
4. Flared or vented greater than 1 hour 1.871 V
(Suoolemental reoort reauired--See 20 AAC 25.235)
5. Pilot and Purge 10.192
6. Used for lease operations Fuel 78~.~~ ~
A«¡<t
7. Other 0
TOTAL items 1 -7 3.184.141
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: PBU CGF (LSEOR NGLS) 255.257
II. Transferred to: CPF 3 0
CPF2 644,754
Remarks: Reinjected vol does not include volumes ofPBU NGLS aquired for LSEOR
reflected on line 10 or Naptha used in SSEOR meter #201
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature:~~ Title: Supervisor 1/20/2003
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK RIVER UNIT 490100 99.53%
KRU WEST SAK 490150 0.47%
Official Use OnlynFlaring Authorization> 1 hr.
I. Safety tB7 MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
¡;Þ<~ ~d<- t.Å-, OJI°t(°3
Commissioner Date
:ß~
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
DATE
TIME
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
CONOCOPHILLIPS ALASKA, INC.
CONSERVATION ORDER NO, 219
GAS FLARING OR VENTING INCIDENTS
CPF #1
January 2003
VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
117/2003
0428-0546
0551-0652
TOTAL OVER 1liOUR
1,871
1,871
PLANNED EVENTS LESS THAN 1 HOUR
Flare or Vent Volumes:
Greater than 1 hour
Less than 1 hour
Continuous Assist
Pilot and Purge
TOTAL FLAREDNENTED
o
1,871
6,898
9,813
10.192
28,774
ElectricaVinstrumentation malfunction; A-GLC shutdown on
suspected low fuel gas pressure.
unplanned Started/restarted TIC #C2-101A; reduced inlet gas
rates; switched fuel gas filters for A-GLC
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility I~perator Wield(S) - rMonthIY ear of Disposition
CENTRAL PROCESSING FACILITY #1 CONOCOPHlLLIPS ALASKA, INC. KUPARUK RIVER UNIT 2/03
Disposition Volume MCF* *Indicate contribution of each pool to total.
1. Sold 11.082 Pool Name Code Percent
2. Reinjected 1,918,501 KUPARUK RIVER UNIT 490100 99.32%
3. Flared or vented less than 1 hour 1,259 /KRu WEST SAK 490150 0.68%
4. Flared or vented greater than I hour 6.667
(Suoolemental reoart reQuired-oSee 20 AAC 25.235\
5. Pilot and Purge 15.881
6. Used for lease ooerations Fuel 77~-N~
A«i<t
7. Other 0
Official Use OnlynFlaring Authorization> 1 hr.
TOT AL items 1 - 7 2.737.533 1. Safetv ~/b6 '7 MCF
8. NGL gas equivalent produced 0 2. Lease Use MCF
9. Purchased gas 0 3. Conserv. Purposes MCF
10. Transferred from: PBU CGF (LSEOR NGLS) 245.220 ~7 L~/~ l~tÝ03
Commissioner Date
11. Transferred to: CPF 3 0
CPF2 385,458 Note: All volumes must be corrected to
Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR pressure of 14.65 psi a and to a temperature of
reflected on line 10 or Naotha used in SSEOR meter #201 60 degrees F. Report due by the 20th of the
I hereby certify that the foregoing is true and correct to the best of my knowledge. month following the month of disposition.
. Authority 20 AAC 25.235.
Signature~~ fr' tJ ¿ ~Title: Supervisor 3/1812003
Form 10-422 (Revised 4/95)
~
DATE
TIME
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
CONOCOPHILLIPS ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CPF #1
FEBRUARY 2003
VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
2/2/2003
1122-1426
2/22/2003
0227-0408
TOTAL OVER 1 HOUR
4,951
1,716
6,667
PLANNED EVENTS LESS THAN 1 HOUR
Flare or Vent Volumes:
Greater than 1 hour
Less than 1 hour
Continuous Assist
Pilot and Purge
TOTALFLAREDNENTED
o
Faulty shutdown on A and C Gas lift
SID TIC A GLC; Instrumentation malfunction
6,667
1,259
6,810
15.881
30,617
unplanned Reduced/increased inlet gas rates
unplanned Reduced inlet gas rates
ALASKA OIL AND GAS CONSERV A TION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility I~perator I~ield(s) ¡MonthlY ear of Disposition
CENTRAL PROCESSING FACILITY #1 CONOCOPHILLIPS ALASKA, INC. KUPARUK RIVER UNIT 3/03
Disposition Volume MCF* *Indicate contribution of each pool to total.
1. Sold 12.102 Pool Name Code Percent
2. Reinjected 2,188,265 KUPARUK RIVER UNIT 490100 98.65%
3. Flared or vented less than 1 hour 423 KRU WEST SAK 490150 1.35%
4. Flared or vented greater than 1 hour 0
(SuopIemental reoort reouired--See 20 AAC 25.235)
5. Pilot and Purge 18.461
6. Used for lease operations ~uel 92~:~g~
,~~i~t
7. Other 0
Official Use Only--Flaring Authorization> 1 hr.
TOTAL items 1 - 7 3.150.311 1. S afetv MCF
8. NGL gas equivalent produced 0 2. Lease Use MCF
9. Purchased gas 0 3. Conserv. Purposes MCF
10. Transferred from: PBU CGF (LSEOR NGLS) 206.142
Commissioner Date
11. Transferred to: CPF 3 0
CPF2 449,271 Note: All volumes must be corrected to
Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR pressure of 14.65 psia and to a temperature of
reflected on line 10 or Naptha used in SSEOR meter #201 60 degrees F. Report due by the 20th of the
I hereby certify that the foregoing is true and correct to the best of my knowledge, month following the month of disposition.
Signature:7Î dJ,~ Authority 20 AAC 25.235.
Title: Supervisor 4/16/2003
Form 10-422 (Revised 4/95)
CONOCOPHILLlPS ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CPF #1
MARCH 2003
DATE
TIME
VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
TOTAL OVER 1 HOUR
PLANNED EVENTS LESS THAN 1 HOUR
Flare or Vent Volumes:
Greater than 1 hour
Less than 1 hour
Continuous Assist
Pilot and Purge
TOTAL FLAREDNENTED
o
o
o
423
7,197
18.461
26,081
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
CENTRAL PROCESSING FACILITY #1
Operator
CONOCOPHILLIPS ALASKA, INC.
Field( s)
KUPARUKRIVER UNIT
MonthlY ear of Disposition
4/03
Disposition Volume MCF*
1. Sold 11.871
2. Reinjected 2,453,995
..
3. Flared or vented less than I hour 6,154
4. Flared or vented greater than I hour 0
(Supolemental reoort reQuired--See 20 AAC 25.235)
5. Pilot and Purge 16.342
6. Used for lease oDerations Fuel 8ig:~~~
A«i<t
7. Other 0
TOTAL items 1 - 7 3.380.050
8. NGL gas eauivalent produced 0
9. Purchased gas 0
10. Transferred from: PBU CGF (LSEOR NGLS) 238.923
11. Transferred to: CPF 3 0
CPF2 650,940
Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR
reflected on line 10 or Navtha used in SSEOR meter #201
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature~ldt, fJ;&O Title: Supervisor 5/19/2003
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK RIVER UNIT 490100 99.47%
KRU WEST SAK 490150 0.53%
Official Use Only--Flaring Authorization> 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th ofthe
month following the month of disposition.
Authority 20 AAC 25.235.
Form 10-422 (Revised 4/95)
CONOCOPHILLlPS ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CPF #1
APRIL 2003
DATE
TIME
VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
TOTAL OVER 1 HOUR
o
PLANNED EVENTS LESS THAN 1 HOUR
o
Flare or Vent Volumes:
Greater than 1 hour
Less than 1 hour
Continuous Assist
Pilot and Purge
o
6,154
12,753
16,342
TOTALFLAREDNENTED
35,249
1 Q-14 State test
Subject: lQ-14 State test
Date: Thu, 10 Apr 2003 10:57:00 -0800
From: "NSK Problem Well Supv" <n1617@conocophillips.com>
To: Iou _grimaldi@admin.state.ak. us, tom _maunder@admin.state.ak.us,
jim Jegg@admin.state.ak.us
cc: "n1617" <n1617@conocophillips.com>
Gentlemen,
Per Lou Girmaldi's request I am forwarding you confirmation that we
troubleshot and flushed the panel on 1Q-14 (PTD # 1850450) following the
failed LPP SVS test yesterday (4/9/03). The LPP failed to trip on the
first test and after initial investigation the State Inspector (Lou) and
our State Tester (Bob) discovered an apparent blockage in the panel. They
were able to bleed the panel and reset and retest the LPP before leaving
the location. Additionally panel was purged and inspected the next day and
the pilot was function tested several times.
Please let me know if you would like more information or have any questions
MJ Loveland
Problem Well Supervisor
ConocoPhillips Alaska Inc.
(907) 659-7224, 659-7043
----- Forwarded by NSK Problem Well Supv/PPCO on 04/10/2003 09:59 AM -----
CPF1 DS Lead Techs
04/10/2003 09:54 AM
To: NSK Problem Well Supv/PPCO@Phillips
cc: CPF1 DS Lead Techs/PPCO@Phillips, CPF1 Prod
Supv/PPCO@Phillips
Subject:
1Q-14 State test
M.J.
In regards to 1Q-14 : Our instrument tech. trouble shot and purged
hydraulic panel this A.M. The pilot was tripped and tested several times
and function properly each time.This appears to have cured any problem we
had .
Thanks, Greg
1 of 1
4/10/20031:53 PM
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility I~perator IField(S) I MonthlY ear of Disposition
CENTRAL PROCESSING FACILITY #1 CONOCOPHILLIPS ALASKA, INC KUP ARUK RIVER UNIT 5/03
Disposition Volume MCF* *Indicate contribution of each pool to total.
1. Sold 11. 924 Pool Name Code Percent
2. Reinjected 3,061,933 KUPARUK RIVER UNIT 490100 99.51 %
3. Flared or vented less than 1 hour 1,296 KRU WEST SAK 490150 0.49%
/
4. Flared or vented greater than I hour 3.259 .'
(SuDolemental reoort reauired--See 20 AAC 25.235\
5. Pilot and Purge 13.713
6. Used for lease operations ~uel 905.005
'00;0\ R'i21
7. Other 0
Official Use OnlynFlaring Authorization> 1 hr.
TOTAL items 1 - 7 4.005.651 1. Safetv :3¡ ~,;cl MCF
8. NGL gas equivalent produced 0 2. Lease Use MCF
9. Purchased gas 0 3. Conserv. Purposes MCF
/"\ -
10. Transferred from: PBU CGF (LSEOR NGLS) 242.167 V)~~ ?/ ~1/3
IV/ z/ " { t
Commissioner Date
11. Transfened to: CPF 3 0
CPF2 1,081,191 Note: All volumes must be cOlTected to
Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR pressure of 14.65 psia and to a temperature of
reflected on line 10 or Naotha used in SSEOR meter #201 60 degrees F. Report due by the 20th of the
I hereby certify that the foregoing is true and correct to the best of my knowledge. month following the month of disposition.
Signature: Y71.£t ~ Authority 20 AAC 25.235.
Title: Supervisor 6/19/2003
:J8f!-
Form 10-422 (Revised 4/95)
DATE
TIME
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
CONOCOPHILLlPS ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CPF #1
MAY 2003
VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
5/1/2003
0852-1142
TOTAL OVER 1 HOUR
PLANNED EVENTS LESS THAN 1 HOUR
Flare or Vent Volumes:
Greater than 1 hour
Less than 1 hour
Continuous Assist
Pilot and Purge
TOTAL FLAREDNENTED
3,259
3,259
o
ESD Tests
3,259
1,296
8,521
13.713
26,789
Planned
Completed ESD test
þ.
ALASKA OIL AND GAS CONSERV A TION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
CENTRAL PROCESSING FACILITY #1
Operator
CONOCOPIllLLIPS ALASKA, INC.
Field(s)
KUPARUKRIVER UNIT
MonthlY ear of Disposition
6/03
Disposition Volume MCF* *Indicate contribution of each pool to total.
I. Sold 11.716 Pool Name Code Percent
2. Reinjected 2,514,488 KUPARUK RIVER UNIT 490100 99.32%
3. Flared or vented less than 1 hour 181 KRU WEST SAK 490150 0.68%
4. Flared or vented greater than 1 hour 435 /I
CSuoolementaI reoort reauired--See 20 AAC 25.235\
5. Pilot and Purge 12.465
6. Used for lease operations Fuel RSR:.rH 81~'~~~
A s<i <I
7. Other 0
Official Use OnlyuFlaring Authorization> 1 hr.
TOTAL items 1 - 7 3.397.496 I. Safety 435 MCF
8. NGL gas equivalent produced 0 2. Lease Use MCF
9. Purchased gas 0 3'JP\erv. Purposes MCF
/~
10. Transferred from: PBU CGF (LSEOR NGLS) 140.524 I())~ 7/1J /. r-f
.~ Pa/' ' t
CotnllÚssion Date
11. Transferred to: CPF 3 0
CPF2 1,113,109 Note: All volumes must be corrected to
Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR pressure of 14.65 psia and to a temperature of
reflected on line 10 or Naotha used in SSEOR meter #201 60 degrees F. Report due by the 20th of the
I hereby certify that the foregojng is true and correct to the best of my knowledge. month following the month of disposition.
Signature7'Îtf£,~ Authority 20 AAC 25.235.
Title: Supervisor 7/1812003
S6p-
Form 10-422 (Revised 4/95)
#'
DATE
TIME
VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE
CONOCOPHILLIPS ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CPF #1
JUNE 2003
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
6/29/2003
1230-1351
TOTAL OVER 1 HOUR
PLANNED EVENTS LESS THAN 1 HOUR
Flare or Vent Volumes:
Greater than 1 hour
Less than 1 hour
Continuous Assist
Pilot and Purge
TOTALFLAREDNENTED
435
435
o
Process upset in NGUMI section of facility; Shutdown of
P2-GD04/5 MI pump caused by shutdown of CPF-1 NGL
transfer pumps GC-403's
435
181
11,792
12,465
24,873
Unplanned Reducedlincreased inlet gas rates; Restart GC-403's
transfer pumps then P2-GD04/5 MI pumps
ALASKA OIL AND GAS CONSERV A TION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
CENTRAL PROCESSING FACILITY #1
Operator
CONOCOPHlLLIPS ALASKA, INC.
Field(s)
KUPARUK RIVER UNIT
MonthlY ear of Disposition
7/03
Disposition Volume MCF*
1. Sold 11.1 04
2. Reinjected 2,722,022
3. Flared or vented less than 1 hour 2,138
,),
4. Flared or vented greater than I hour t:.. I 2. '" 7.097 ,/
(suooIementaI renort reauired--See 20 AAC 25.235)
5. Pilot and Purge 12.686
6. Used for lease operations Fuel ~ ~ ~ ~3 3 8~~.~~¡
A..i.t
7. Other 0
TOTAL items 1 - 7 3.623.280
8. NGL gas equivalent oroduced 0
9. Purchased gas 0
10. Transferred from: PBU CGF (LSEOR NGLS) 212.336
11. Transferred to: CPF 3 0
CPF2 1,128,117
Remarks: Reinjected vol does not include volumes ofPBU NGLS aquired for LSEOR
reflected on line 10 or Naotha used in SSEOR meter #201
I hereby certify that the foregoing is true and correct to the best of my knowledge.
..
Signature: -y'} I'l¿ (}11il Title: Supervisor 8/1912003
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK RIVER UNIT 490100 99.13%
KRU WEST SAK 490150 0.87%
Official Use Only--Flaring Authorization> 1 hr.
1. Safety {/ clt7MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
/f-1·ÄR~~ t?/2~ "5
Commissioner Date
J e.,,----
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
..
CONOCOPHILLIPS ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CPF #1
JULY 2003
DATE
TIME
VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
7/2/2003 0505-0927 1,427 SID T/C# 'A' GLC; electrical malfunction
7/18/2003 0611-0721 594 Emergency shutdown; added additional fuel gas to flare to
improve combustion characteristics
7/18/2003 0723-0941 3,464 Emergency shutdown
7/19/2003 2204-0021 1,017 Excessive inlet gas rates into facility; facility start up
7/20/2003 0200-0503 192 Excessive inlet gas rates into facility; facility start up
7/20/2003 0700-0806 403 Instrumentation malfunction
1050-1326
1334-1604
TOTAL OVER 1 HOUR 7,097 ../
PLANNED EVENTS LESS THAN 1 HOUR
o
Flare or Vent Volumes:
Greater than 1 hour
Less than 1 hour
Continuous Assist
Pilot and Purge
7,097
2,138
11,551
12.686
TOTALFLAREDNENTED
33,472
Unplanned Reduced inlet gas rates; corrected E&I failure
Planned Corrected E&I fluctuation/failure
Planned Added additional fuel gas to flare to improve
combustion characteristics
Planned Started facility
Planned Started facility
Unplanned
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
CENTRAL PROCESSING FACILITY #1
Operator
CONOCOPHILLIPS ALASKA, INC
Field(s)
KUPARUKRIVER UNIT
MonthlY ear of Disposition
8/03
Disposition Volume MCF*
1. Sold 11.582
2. Reinjected 3,376,256
3. Flared or vented less than 1 hour 696
4. Flared or vented greater than 1 hour 0
(SuoolementaI reoort reauired--See 20 AAC 25.235\
5. Pilot and Purge 10.290
6. Used for lease operations Fuel 89~:gý~
A ssi st
7. Other 0
TOTAL items 1 - 7 4.297,910
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: PBU CGF (LSEOR NGLS) 246.073
11. Transferred to: CPF 3 0
CPF2 1,342,562
Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR
reflected on line 10 or Naptha used in SSEOR meter #201
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature: f7fJi.1~ Title: Supervisor 9/17/2003
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK RIVER UNIT 490100 99.12%
KRU WEST SAK 490150 0.88%
Official Use Only--Flaring Authorization> 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
Form 10-422 (Revised 4/95)
CONOCOPHILLIPS ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CPF #1
AUGUST 2003
DATE
TIME
VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
TOTAL OVER 1 HOUR
PLANNED EVENTS LESS THAN 1 HOUR
Flare or Vent Volumes:
Greater than 1 hour
Less than 1 hour
Continuous Assist
Pilot and Purge
TOTALFLAREDNENTED
o
o
o
696
8,018
10.290
19,004
..
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
CENTRAL PROCESSING FACILITY #1
Operator
ICONOCOPHILLIPS ALASKA, INC
¡Field(S)
KUPARUKRIVER UNIT
Disposition Volume MCF*
1. Sold 11.527
2. Reinjected 2,739,584
3. Flared or vented less than 1 hour 2,907
4. Flared or vented greater than 1 hour 0
(SuDolemental reoort reauired--See 20 AAC 25.235)
5. Pilot and Purge 12.022
6. Used for lease operations Àuel 855.891
Issi<t 4'i17
7. Other 0
TOTAL items I - 7 3.626.463
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: PBU CGF (LSEOR NGLS) 285.158
II. Transferred to: CPF 3 0
CPF2 957,979
Remarks: Reinjected vol does not include volumes ofPBU NGLS aquired for LSEOR
reflected on line 10 or NaPtha used in SSEOR meter #201
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature: --¡/}Ilé ~ Title: Supervisor 10/16/2003
Form 10-422 (Revised 4/95)
¡MonthlY ear of Disposition
9/03
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK RIVER UNIT 490100 99.08%
KRU WEST SAK 490150 0.92%
Official Use Only--Flaring Authorization> 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
DATE
TIME
VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE
CONOCOPHILLIPS ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CPF #1
SEPTEMBER 2003
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
TOTAL OVER 1 HOUR
PLANNED EVENTS LESS THAN 1 HOUR
Flare or Vent Volumes:
Greater than 1 hour
Less than 1 hour
Continuous Assist
Pilot and Purge
TOTALFLAREDNENTED
o
o
o
2,907
4,532
12.022
19,461
"I
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
CENTRAL PROCESSING FACILITY #1
Operator
CONOCOPHILLIPS ALASKA, INC
Field( s)
KUPARUK RIVER UNIT
MonthlY ear of Disposition
10103
o
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK RIVER UNIT 490100 98.77%
KRU WEST SAK 490150 1.23%
Disposition
Volume MCF*
1. Sold
11.015
2. Reinjected
2,948,407
3. Flared or vented less than I hour
2,796
5. Pilot and Purge
I 1.045
6. Used for lease operations
Fuel
844.475
7. Other
o
Official Use Only--Flaring Authorization> 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
TOTAL items 1 - 7
3.822.497
8. NGL gas eauivalent produced
o
9. Purchased gas
o
10. Transferred from: PBU CGF (LSEOR NGLS)
289.650
11. Transferred to: CPF 3
CPF2
Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR
reflected on line 10 or Na tha used in SSEOR meter #201
I hereby certify that the foregoing is true and correct to the best of my knowledge.
o
913,353
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
Signature:
Form 10-422 (Revised 4/95)
Title: Supervisor
III 1712003
.~
"
DATE
TIME
VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE
CONOCOPHILLIPS ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CPF #1
OCTOBER 2003
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
TOTAL OVER 1 HOUR
PLANNED EVENTS LESS THAN 1 HOUR
Flare or Vent Volumes:
Greater than 1 hour
Less than 1 hour
Continuous Assist
Pilot and Purge
TOTALFLAREDNENTED
o
o
o
2,796
4,759
11.045
18,600
.,
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility I~perator Field(S) MonthIY ear of Disposition
CENTRAL PROCESSING FACILITY #1 CONOCOPHILLlPS ALASKA. INC. KUPARUK RIVER UNIT I 1/03
Disposition Volume MCF* *Indicate contribution of each pool to total.
1. Sold 11.418 Pool Name Code Percent
2. Reinjected 2,885,088 KUPARUKRIVER UNIT 490100 99.04%
3. Flared or vented less than 1 hour 7,580 KRU WEST SAK 490150 0.96%
4. Flared or vented greater than 1 hour 0
(Suoolemental reoort reauired--See 20 AAC 25.235'
5. Pilot and Purge 11.326
6. Used for lease operations ~~el 88¡.~~
.~~j~t
7. Other 0
Official Use Only--Flaring Authorization> 1 hr.
TOTAL items 1 - 7 3.809.319 1. Safety MCF
8. NGL gas eauivalent produced 0 2. Lease Use MCF
9. Purchased gas 0 3. Conserv. Purposes MCF
10. Transferred from: PBU CGF (LSEOR NGLS) 249.945
Commissioner Date
II. Transferred to: CPF 3 0
CPF2 875,524 Note: All volumes must be corrected to
Remarks: Reinjected yol does not include volumes ofPBU NGLS aquired for LSEOR pressure of 14.65 psia and to a temperature of
reflected on line 10 or Naptha used in SSEOR meter #201 60 degrees F. Report due by the 20th of the
I hereby certify that the foregoing is true and correct to the best of my knowledge. month following the month of disposition.
Signature: ~di A aì. tJ Authority 20 AAC 25.235.
Title: Supervisor 12/1212003
Form 10-422 (Reyjsed 4/95)
#<
CONOCOPHILLIPS ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CPF #1
NOVEMBER 2003
DATE
TIME
VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
TOTAL OVER 1 HOUR
PLANNED EVENTS LESS THAN 1 HOUR
Flare or Vent Volumes:
Greater than 1 hour
Less than 1 hour
Continuous Assist
Pilot and Purge
TOTALFLAREDIVENTED
o
o
o
7,580
4,798
11.326
23,704
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
CENTRAL PROCESSING FACILITY #1
Operator
ICONOCOPHILLIPS ALASKA. INC.
IField(s)
I KUPARUK RIVER UNIT
I MonthN ear of Disposition
I 12103
Disposition Volume MCF*
I. Sold 11.604
2. Reinjected 3,419,172
3. Flared or vented less than 1 hour 5,031
4. Flared or vented greater than 1 hour 0
(Supplemental repOrt required-oSee 20 AAC 25.235'
5. Pilot and Purge 12.232
6. Used for lease operations Fuel 92H~1
A~~;~t
7. Other 0
TOTAL items 1 -7 4.381.538
8. NGL gas eauivalent produced 0
9. Purchased gas 0
10. Transferred from: PBU CGF (LSEOR NGLS) 259.615
11. Transferred to: CPF 3 0
CPF2 1,182,885
Remarks: Reinjected vol does not include yolumes of PBU NGLS aquired for LSEOR
reflected on line 10 or Naptha used in SSEOR meter #201
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature: ì/} ILlJ Á ~ Title: Supervisor I /1'1/0'1
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK RIVER UNIT 490100 97.04%
KRU WEST SAK 490150 2.96%
Official Use Only--FIaring Authorization> 1 hr.
I. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
.
Form 10-422 (ReYlsed 4/95)
CONOCOPHILLIPS ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CPF #1
DECEMBER 2003
DATE
TIME
VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
TOTAL OVER 1 HOUR
PLANNED EVENTS LESS THAN 1 HOUR
Flare or Vent Volumes:
Greater than 1 hour
Less than 1 hour
Continuous Assist
Pilot and Purge
TOTALFLARED/VENTED
o
o
o
5,031
5,114
12.232