Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutKRU CPF 2 / Conoco Phillips STATE OF ALASKA AOGCC GAS DISPOSITION FILES YEAR: 2003 FACILITY: KRU CPF 2 OPERATOR: CONOCOPHILLIPS ALASKA INC ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility CENTRAL PROCESSING FACILITY #2 Operator CONOCOPHILLIPS ALASKA, INC. Field( s) KUPARUK RIVER UNIT MonthlYear of Disposition 1/03 Disposition Volume MCF* I. Sold 35.107 2. Reinjected 6,046,321 3. Flared or vented less than I hour 20,118 4. Flared or vented greater than I hour 18,995 / ISunnlemental renort reCluired--See 20 AAC 25.235) 5. Pilot and Purge 17,159 6. Used for lease operations Fuel 772,536 A ..i.t 0 7. Other 0 TOTAL items 1 -7 6.910.236 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: PBU CGF (LSEOR NGLS) 920.111 CPFI 644,754 II. Transferred to: 0 Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR reflected on line 10 or Naptha used in SSEOR meter #201 I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature7)d£~ Title: Supervisor 1/20/2003 *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK RIVER UNIT 490100 88.80% KUPARUK RIVER UNIT MELTWATER 490140 3.64% KUPARUK RIVER UNIT TABASCO 490160 0.08% KUPARUK RIVER UNIT TARN 490165 7.48% Official Use Only--Flaring Authorization> 1 hr. 1. Safety 181 qc¡.s MCF 2. Lease Use MCF 3. Conserv. Purposes MCF ~~ hÞ-//t--) tJ 3/0(,/ á:l Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 (Revised 4/95) CONOCOPHILlIPS ALASKA, INC. CONSERVATION ORDER NO. 219 GAS FLAR/tIIG OR VENTING INCIDENTS , CPF #2 January DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 1/18/2003 0631-0736 2,687 Electrical/instr. malfunction; power failure Unplanned Reduced/increased inlet gas rates; stabilized facility process and operation 1/18/2003 1933-2208 5,107 Electrical/instrum. Malfunction at other facility; power Unplanned Reduced/increased inlet gas rates; stabilized failure/load shed facility process & operation; S/I 9 wells totalling 30000 msctd 1/19/2003 0103-0231 5,659 Excessive/insufficient inlet gas rates into facility; process Unplanned Reduced/increased inlet gase rates; stabilized upset in gas section of facility; pressure spike into facility process and operation; re-started GLC's primary sep. casued 2 GLC's to SID on surge events after several trys. S/I 15 wells totalling 45000 mscfd 1/20/2093 1600-1703 1,924 Electrical/instrumentation malfunction; facility shutdown Unplanned Reduced/increased inlet gas rates; stabilized on B GLC facility process and operation; restarted B GLC 1/21/2003 1838-2036 3,618 Process upset in gas section of facility; C-2-1 01 C Unplanned Reduced inlet gas rates; repaired equipment shutdown difficulties with C2-101C TOTAL OVER 1 HOUR 18,995 PLANNED EVENTS LESS THAN 1 HOUR o Flare or Vent Volumes: Greater than 1 hour Less than 1 hour Continuous Assist Pilot and Purge 18,995 20,118 o 17.159 TOTAL FLAREDNENTED 56,272 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility I¡operator 1 iield( s) 1Month/Y ear of Disposition CENTRAL PROCESSING FACILITY #2 CONOCOPHILLlPS ALASKA, INC. KUPARUK RIVER UNIT 2/03 Disposition Volume MCF* *Indicate contribution of each pool to total. 1. Sold 32.006 Pool Name Code Percent 2. Reinjected 5,397,846 KUPARUK RIVER UNIT 490100 88.13% 3. Flared or vented less than I hour 13,216 KUPARUK RIVER UNIT MELTWATER 490140 3.53% 4. Flared or vented greater than 1 hour 4,809 V KUPARUKRIVER UNITTABASCO 490160 0.09% !Suoolemental reoort reauired--See 20 AAC 25.235) 5. Pilot and Purge 16,122 KUPARUK RIVER UNIT TARN 490165 8.25% 6. Used for lease operations Fuel 684,975 Assi.t 0 7. Other 0 Official Use Only--Flaring Authorization> 1 hr. TOTAL items 1 - 7 6.148.974 1. Safety 4-\ 'tØt MCF 8. NGL gas equivalent Droduced 0 2. Lease Use MCF 9. Purchased gas 0 3. Conserv. Purposes MCF 10. Transferred from: PBU CGF (LSEOR NGLS) 784.036 Þ /- Af> _ J_¿ / Wð] CPFI 385,458 7 Commissioner Date 11. Transferred to: 0 Note: All volumes must be corrected to Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR pressure of 14.65 psia and to a temperature of reflected on line 10 or Naptha used in SSEOR meter #201 60 degrees F. Report due by the 20th of the I hereby certify that the foregoing is true and correct to the best of my knowledge. month following the month of disposition. Signature~Ý ¡,) t... ~itle: Supervisor Authority 20 AAC 25.235. 3/lB/2003 0Î3fL. Form 10-422 (Revised 4/95) DATE TIME CONOCOPHILLIPS ALASKA, INC. CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF #2 FEBRUARY 2003 VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 2/16/2003 1451-1558 2/24/2003 2153-2347 TOTAL OVER 1 HOUR 2,734 2,075 4,809 PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Volumes: Greater than 1 hour Less than 1 hour Continuous Assist Pilot and Purge TOTAL FLAREDNENTED o 4,809 13,216 o 16.122 34,147 Faulty shutdown on Lost C GLC on surge Electrical malfunction; electrical malfunction at other facility PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Unplanned Reduced/increased inlet gas rates; stabilized facility process and operation; shut in 77 mmscf total of 31 wells Unplanned Reduced inlet gas rates; corrected E&I fluctuation/ failure at other facility (T&D) ALASKA OIL AND GAS CONSERV A TION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility CENTRAL PROCESSING FACILITY #2 Operator CONOCOPHILLIPS ALASKA, INC. Field(s) KUPARUK RIVER UNIT MonthlY ear of Disposition 3/03 Disposition Volume MCF* *Indicate contribution of each pool to total. 1. Sold 35.645 Pool Name Code Percent 2. Reinjected 5,931,092 KUPARUK RIVER UNIT 490100 83.30% 3. Flared or vented less than 1 hour 13,487 KUPARUK RIVER UNIT MELTWATER 490140 5.09% 4. Flared or vented greater than 1 hour 2,137 ./' KUPARUK RIVER UNIT TABASCO 490160 0.17% (Suoolemental renort ret1uired--See 20 AAC 25.235) 5. Pilot and Purge 18,313 KUPARUKRIVER UNIT TARN 490165 I 1.44% 6. Used for lease operations Fuel 737,651 Assist n 7. Other 0 Official Use Only--Flaring Authorization> 1 hr. TOTAL items 1 - 7 6.738.325 1. Safetv 2r ':!/7 MCF 8. NGL gas eauivalent produced 0 2. Lease Use MCF 9. Purchased gas 0 3. Conserv. Purposes MCF 10. Transferred from: PBU CGF (LSEOR NGLS) 827.935 ~ ~LÅ- !; g1ð-; CPFI 449,271 Commissioner Date II. Transferred to: 0 Note: All volumes must be corrected to Remarks: Reinjected vol does not include volumes ofPBU NGLS aquired for LSEOR pressure of 14.65 psia and to a temperature of reflected on line 10 or Naptha used in SSEOR meter #201 60 degrees F. Report due by the 20th of the I hereby certify that the foregoing is true and correct to the best of my knowledge. month following the month of disposition. SignatureY7IJLA.~ Authority 20 AAC 25.235. Title: Supervisor 4/16/2003 ..Jßr- Form 10-422 (Revised 4/95) CONOCOPHILLlPS ALASKA, INC. CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF #2 MARCH 2003 DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 3/17/2003 0920-1057 1,172 Electrical malfunction; Faulty shutdown on C'G/C Unplanned Reduced inlet gas rates; stabilized facility process and operation; CPF-1 started spare GIC total of 31 wells 3/18/2003 1415-1530 690 Instrumentation malfunction; Started fuel gas stripping Unplanned Reduced inlet gas rates; Stabilized facility process unit in preparing GEX for start-up; Start-up took longer and operation than anticipated 3/19/2003 1057-1158 275 Instrumentation malfunction; GEX case drains were Unplanned Reduced inlet gas rates; Stabilized facility process open; valve was out of sequence and operation; Closed case drains TOTAL OVER 1 HOUR 2,137 PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Volumes: Greater than 1 hour Less than 1 hour Continuous Assist Pilot and Purge 2,137 13,487 o 18.313 TOTALFLAREDNENTED 33,937 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility CENTRAL PROCESSING FACILITY #2 Operator cONOCOPHILLIPS ALASKA, INC. Field(s) KUPARUK RIVER UNIT 4/03 Disposition Volume MCF* 1. Sold 32.216 2. Reinjected 5,545,778 3. Flared or vented less than 1 hour 9,207 4. Flared or vented greater than 1 hour 0 ISunnlemental renort reauired--See 20 AAc 25.235\ 5. Pilot and Purge 16,917 6. Used for lease operations Fuel 732,357 A .si.t 0 7. Other 0 TOTAL items 1 - 7 6.336.475 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: PBU CGF (LSEOR NGLS) 752.430 CPF1 650,940 11. Transferred to: 0 Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR reflected on line 10 or Naptha used in SSEOR meter #201 I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature'ijtR.tJju., Title: Supervisor 5/1912003 Form 10-422 (Revised 4/95) MonthlY ear of Disposition *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUKRIVER UNIT 490100 88.18% KUPARUK RIVER UNIT MEL TW ATER 490140 4.07% KUPARUK RIVER UNIT TABASCO 490160 0.12% KUPARUKRIVER UNIT TARN 490165 7.63% Official Use Only--Flaring Authorization> 1 hr. 1. Safetv MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. CONOCOPHILLlPS ALASKA, INC. CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF #2 APRIL 2003 DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR TOTAL OVER 1 HOUR o PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Volumes: Greater than 1 hour Less than 1 hour Continuous Assist Pilot and Purge o 9,207 o 16.917 TOTALFLAREDNENTED 26,124 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility CENTRAL PROCESSING FACILITY #2 Operator CONOCOPHILLIPS ALASKA, INC. Disposition Volume MCF* 1. Sold 35.950 2. Reinjected 5,508,316 3. Flared or vented less than 1 hour 2,828 10,391 5. Pilot and Purge 17,477 6. Used for lease operations Fuel 745,921 7. Other TOTAL items 1 - 7 6.320.883 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from: PBU CGF (LSEOR NGLS) CPFl 727.216 1,081,191 11. Transferred to: Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR reflected on line 10 or Na tha used in SSEOR meter #201 I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature:~ø..~ Title: Supervisor 6/19/2003 Form 10-422 (Revised 4/95) Field(s) KUPARUK RIVER UNIT MonthlYear of Disposition *Indicate contribution of each pool to total. Pool Name KUP ARUK RIVER UNIT KUP ARUK RIVER UNIT MEL TW A TER KUPARUK RIVER UNIT TABASCO KUPARUK RIVER UNIT TARN o Official Use Only--Flaring Authorization> 1 hr. 1. Safetv o 2. Lease Use o 3. Conserv. Purposes Commissioner o Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. 5/03 Code Percent 490100 88.36% 490140 3.86% 490160 0.11% 490165 7.67% ¡D,3G((MCF ..~ MCF MCF 7/:Jì/3 l ( Date DATE TIME CONOCOPHILLlPS ALASKA, INC. CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF #2 MAY 2003 VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 5/6/2003 0500-0708 5/11/2003 2016-2145 TOTAL OVER 1 HOUR 4,314 6,077 10,391 PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Volumes: Greater than 1 hour Less than 1 hour Continuous Assist Pilot and Purge TOTAL FLAREDNENTED 10,391 2,828 o 17.4 77 30,696 Excessive/insufficient inlet gas rates into facility; process upset in gas section of facility; lost D-GLC due to ins!. malfunction; lost NGL pump due to OPL shutdown; lost D-GLC due to high psi in system Electrical/instrumentation malfunction; process upset in Gas/EOR section of facility; Bailey DCS PLC card failed - GD01-0SD PLC card PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Unplanned Stabilized facility process and operation; shut in wells to eliminate flare Unplanned Reduced/increased inlet gas rates; stabilized facility process and operation; repaired equipment difficulties with Bailey; shut in 23 production wells for a total of -70 mmscfd gas and -17,400 bpd oil ALASKA OIL AND GAS CONSERV A TION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility CENTRAL PROCESSING FACILITY #2 Operator CONOcOPHlLLlPS ALASKA, INC. Field(s) KUPARUK RIVER UNIT 6/03 Disposition Volume MCF* 1. Sold 34.749 2. Reinjected 4,937,074 3. Flared or vented less than 1 hour 8,852 4. Flared or vented greater than I hour 0 !SuDolemental reoort reauired--See 20 AAc 25.235) 5. Pilot and Purge 17,203 6. Used for lease operations Fuel 690,547 A..i.t 0 7. Other 0 TOTAL items 1 - 7 5.688.425 8. NGL gas eauivalent produced 0 9. Purchased gas 0 10. Transferred from: PBU CGF (LSEOR NGLS) J 9 ' 78)... 801.673 CPF1 j 't 1,113,109 11. Transferred to: 0 Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR reflected on line 10 or Naptha used in SSEOR meter #201 I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature: '77~~ Title: Supervisor 7/18/2003 Form 10-422 (Revised 4/95) MonthlY ear of Disposition *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK RIVER UNIT 490 100 88.67% KUPARUK RIVER UNIT MELTWATER 490140 2.88% KUPARUK RIVER UNIT TABASCO 490160 0.14% KUPARUK RIVER UNIT TARN 490165 8.31% Official Use Only--Flaring Authorization> 1 hr. 1. Safetv MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. CONOCOPHILLlPS ALASKA, INC. CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF #2 JUNE 2003 DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR TOTAL OVER 1 HOUR o PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Volumes: Greater than 1 hour Less than 1 hour Continuous Assist Pilot and Purge o 8,852 o 17.203 TOTALFLAREDNENTED 26,055 ALASKA OIL AND GAS CONSERV A TION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility 1operator iield(S) I MonthlY ear of Disposition CENTRAL PROCESSING FACILITY #2 CONOCOPHILLIPS ALASKA, INC. KUPARUK RIVER UNIT 7/03 Disposition Volume MCF* *Indicate contribution of each pool to total. 1. Sold 34,102 Pool Name Code Percent 2. Reinjected 4,865,189 KUPARUK RIVER UNIT 490100 88.14% 3. Flared or vented less than 1 hour 7,067 KUPARUK RIVER UNIT MELTWATER 490140 3.07% 4. Flared or vented greater than 1 hour Iå, 118 ¡/ KUPARUK RIVER UNIT TABASCO 490160 0.13% ISunnlemental renort reauired--See 20 AAC 25.235) 5. Pilot and Purge 24,253 KUPARUKRIVER UNIT TARN 490t65 8.66% 6. Used for lease operations Fuel 700,502 A oo;ot 0 7. Other 0 Official Use Only--Flaring Authorization> 1 hr. TOTAL items I - 7 5.631.231 1. Safetv IIß MCF 8. NGL gas equivalent produced 0 2. Lease Use MCF 9. Purchased gas 0 3. Conserv. Purposes MCF 10. Transferred from: PBU CGF (LSEOR NGLS) /87 f3Z,.746.259 ¡e--~ ~YL- fi!:!1/-C0 CPFl ,128,117 Commissioner Date 11. Transferred to: 0 Note: All volumes must be corrected to Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR pressure of 14.65 psia and to a temperature of reflected on line 10 or Naptha used in SSEOR meter #201 60 degrees F. Report due by the 20th of the I hereby certify that the foregoing is true and correct to the best of my knowledge. month following the month of disposition. Signature: --r7Æ ~ Authority 20 AAC 25.235. Title: Supervisor 8/19/2003 08,- Form 10-422 (Revised 4/95) CONOCOPHILLlPS ALASKA, INC. CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF #2 JULY 2003 DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 7/18/2003 118 FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 1310-1418 TOTAL OVER 1 HOUR 118 PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Volumes: Greater than 1 hour Less than 1 hour Continuous Assist Pilot and Purge 118 7,067 o 24,253 TOTALFLAREDNENTED 31,438 Faulty shutdown on 7/18/03 (CPF1); West Sak wells flow diverted to et oil line while CPF-1 down for EDS testing causing excess gas to vent off Sec. Sep. because A-STV is down for motor replacement Unplanned Wet oil line flow swapped from secondary sep. to primary sep. removing gas load from STV Compo 'B' and flare ~ ., ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility CENTRAL PROCESSING FACILITY #2 Operator CONOCOPHILLIPS ALASKA, INC. Field(s) KUPARUK RIVER UNIT MonthlY ear of Disposition 8/03 Disposition Volume MCF* *Indicate contribution of each pool to total. 1. Sold 34,655 Pool Name Code Percent 2. Reinjected 5,116,559 KUPARUK RIVER UNIT 490100 90.30% 3. Flared or vented less than 1 hour 5,404 KUPARUK RIVER UNIT MELTWATER 490140 2.95% 4. Flared or vented greater than 1 hour 6,330 7 KUPARUK RIVER UNIT TAB AS CO 490160 0.11% ISuoolemental reoort reauired--See 20 AAC 25.235) 5. Pilot and Purge 25,888 KUPARUKRIVER UNIT TARN 490165 6.64% 6. Used for lease operations Fuel 696,781 A..i.t 0 7. Other 0 Official Use Only--Flaring Authorization> 1 hr. TOTAL items 1 - 7 5.885,617 1. Safety 6. 330 MCF 8. NGL gas equivalent produced 0 2. Lease Use MCF 9. Purchased gas 0 3. Conserv. Purposes MCF A ;{J_ /~ Jt': - /", ~ /1/~/O3 10. Transferred from: PBU CGF (LSEOR NGLS) 785.127 I 7 ,..., CPFl 1,342,562 / Commissioner Date 11. Transferred to: 0 Note: All volumes must be corrected to Remarks: Reinjected vol does not include volumes ofPBU NGLS aquired for LSEOR pressure of 14.65 psia and to a temperature of reflected on line 10 or Naptha used in SSEOR meter #201 60 degrees F. Report due by the 20th of the I hereby certify that the foregoing is true and correct to the best of my knowledge. month following the month of disposition. Signature: 77~ Authority 20 AAC 25.235. Title: Supervisor 9/17/2003 Qß;- Form 10-422 (Revised 4/95) - " '" DATE TIME CONOCOPHILLlPS ALASKA, INC. CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF #2 AUGUST 2003 VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 8/6/2003 1909-2352 8/28/2003 0441-0654 TOTAL OVER 1 HOUR 1,203 Faulty shutdown on "B" STY Hi Hi Temp; "B" STV compressor shut down on high temperature due to suction valve failure on second stage. "A" STV out of service, waiting on replacement motor 5,127 Excessive/insufficient inlet gas rates into facility; process upset in gas section of facility; insufficient inlet gas to PS caused all three turbine driven GLCs to surge and shut down 6,330 PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Volumes: Greater than 1 hour Less than 1 hour Continuous Assist Pilot and Purge TOTALFLAREDNENTED 6,330 5,404 o 25.888 37,622 PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Unplanned Compressor/train depressured; repaired equipment difficulties with new valves; called out mechanics to repair compressor. Had to replace all the suction valves on #3 cylinder. Unplanned Reduced inlet gas rates; stabilized facility process and operation; restarted all 3 GLCs, shut-in 8 production wells totaling 55.5 MMSCFD gas and 8,300 BPD oil. .. ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility CENTRAL PROCESSING FACILITY #2 Operator CONOCOPHILLIPS ALASKA, INC. Field(s) KUPARUK RIVER UNIT MonthlY ear of Disposition 9/03 Disposition Volume MCF* *Indicate contribution of each pool to total. 1. Sold 34.451 Pool Name Code Percent 2. Reinjected 5,098,560 KUPARUK RIVER UNIT 490100 89.93% 3. Flared or vented less than I hour 24,749 KUPARUK RIVER UNIT MEL TW A TER 490140 2.61% / 4. Flared or vented greater than 1 hour 9,401 1.-1 KUPARUK RIVER UNIT TABASCO 490160 0.11% ISunnlemental renort renuired--See 20 AAC 25.235\ 5. Pilot and Purge 24,161 KUPARUK RIVER UNIT TARN 490165 7.35% 6. Used for lease operations Fuel 664,754 A..i.t () 7. Other 0 Official Use Only--Flaring Authorization> 1 hr. TOTAL items I - 7 5.856.076 1. Safetv Ct401 MCF 8. NGL gas equivalent produced 0 2. Lease Use MCF 9. Purchased gas 0 3. Conserv. Purposes MCF . 10. Transferred from: PBU CGF (LSEOR NGLS) 719.616 CPFl 957,979 Commissioner Date 11. Transferred to: 0 Note: All volumes must be corrected to Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR pressure of 14.65 psi a and to a temperature of reflected on line 10 or Naptha used in SSEOR meter #201 60 degrees F. Report due by the 20th of the I hereby certify that the foregoing is true and correct to the best of my knowledge. month following the month of disposition. Signature: 7J1lL ~ Authority 20 AAC 25.235. Title: Supervisor 10/16/2003 Form 10-422 (Revised 4/95) ". DATE TIME CONOCOPHILLlPS ALASKA, INC. CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF #2 SEPTEMBER 2003 VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 9/8/2003 2308-0127 9/9/2003 1146-1256 9/15/2003 1131-1303 TOTAL OVER 1 HOUR 8,025 542 834 9,401 PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Volumes: Greater than 1 hour Less than 1 hour Continuous Assist Pilot and Purge TOTALFLAREDNENTED 9,401 24,749 o 24.161 58,311 Electricallinstrumentation malfunction; faulty shutdown on loss of electrical power Valve leaking by while performing emergency depressure of process line due to gas leak on ROV-1399 in the GEX module Facility maintenance GEX module PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Unplanned Started/restarted T/C # 42028 Gen; reduced/in- creased inlet gas rates; stabilized facility process and operation; had to start both "A" & "B" emergency generators Unplanned Line was depressured and valve serviced that was leaking by Unplanned Repaired equipment difficulties with D GLC;fIaring during restart on 0 GLC """ ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility CENTRAL PROCESSING FACILITY #2 Operator CONOCOPHILLlPS ALASKA, INC. Disposition Volume MCF* 1. Sold 34.457 2. Reinjected 5,475,716 3. Flared or vented less than I hour 19,413 4. Flared or vented greater than I hour Su lemental re ort re uired--See 20 AAC 25.235 5. Pilot and Purge 26,185 6. Used for lease operations Fuel 690,293 7. Other TOTAL items I - 7 6.246.886 8. NGL gas eauivalent produced 9. Purchased gas 10. Transferred from: PBU CGP (LSEOR NGLS) CPFl 796.705 913,353 11. Transferred to: Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR reflected on line 10 or Na tha used in SSEOR meter #201 I hereby certify that the foregoing is true and correct to the best of my knowledge. .. Title: Supervisor 11117/2003 Fonn 10-422 (Revised 4/95) 822 Field(s) KUPARUK RIVER UNIT MonthlY ear of Disposition *Indicate contribution of each pool to total. Pool Name KUPARUK RIVER UNIT KUPARUK RIVER UNIT MEL TW A TER KUPARUKRIVER UNITTABASCO KUPARUKRIVER UNIT TARN o Official Use Only--Flarin Authorization> 1 hr. I. Safety o 2. Lease Use o 3. Conserv. Purposes o Note: All volumes must be corrected to pressure of 14.65 psi a and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. 10/03 Code Percent 490100 89.49% 490140 2.98% 490160 0.10% 490165 7.43% ~&z...- MCF ~.Æ-- MCF MCF / Date ., DATE TIME CONOCOPHILLlPS ALASKA, INC. CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF #2 OCTOBER 2003 VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 10/1/2003 2245-2345 TOTAL OVER 1 HOUR 822 822 PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Volumes: Greater than 1 hour Less than 1 hour Continuous Assist Pilot and Purge TOTAL FLAREDNENTED 822 19,413 o 26.185 46,420 High ambient temperatures; wind direction changed increasing GLC's inlet temps. Also caused 'B' GLC 2nd sig. To recycle harder. PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Unplanned Reduced inlet gas rates; CPF-1 lowered tie-line pressure ~ ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility CENTRAL PROCESSING FACILITY #2 Field(s) KUPARUK RIVER UNIT 11/03 MonthlY ear of Disposition Operator CONOCOPHILLIPS ALASKA, INC. Disposition Volume MCF* *Indicate contribution of each pool to total. 1. Sold 34.447 Pool Name Code Percent 2. Reinjected 5,648,331 KUPARUK RIVER UNIT 490100 90.88% 3. Flared or vented less than 1 hour 10,848 KUPARUK RIVER UNIT MELTWATER 490140 2.87% .' 4. Flared or vented greater than 1 hour 87 l' KUPARUK RIVER UNITTABASCO 490160 0.09% !Suoolemental reoort reauired--See 20 AAC 25.235) 5. Pilot and Purge 24,694 KUPARUK RIVER UNIT TARN 490165 6.16% 6. Used for lease operations Fuel 702,715 A.~i.t 0 7. Other 0 Official Use Only--Flaring Authorization> 1 hr. TOTAL items 1 - 7 6.421.122 1. Safety 87 MCF 8. NGL gas eauivalent produced 0 2. Lease Use MCF 9. Purchased gas 0 3. Conserv. Purposes // MCF ""' ,j 10. Transferred from: PBU CGF (LSEOR NGLS) 802.771 {J '\ Y-z: A 'l II;;; / 1- CPFl 875,524 / \:::y/ / ,t/ / L ( ! Commissioner Date I 1. Transferred to: 0 Note: All volumes must be corrected to Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR pressure of 14.65 psi a and to a temperature of çk reflected on line 10 or NaPtha used in SSEOR meter #201 60 degrees F. Report due by the 20th of the 1 hereby certify that the foregoing is true and correct to the best of my knowledge. month following the month of disposition. J/b( Signature: ~ ~ Authority 20 AAC 25.235. Title: Supervisor 12/12/2003 \ Form 10-422 (Revised 4/95) 6'&- ~\ \ \ \Le -tv ~w ~~. IO,CbU~. l .. L \ h~ '/ 15 M~ ~ ~.. 9U-UL ~. ðßR .. CONOCOPHILLlPS ALASKA, INC. CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF #2 NOVEMBER 2003 DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 11/26/2003 1642-1747 87 FLARING OR VENTING EVENTS GREATER THAN 1 HOUR TOTAL OVER 1 HOUR 87 PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Volumes: Greater than 1 hour Less than 1 hour Continuous Assist Pilot and Purge 87 10,848 o 24.694 TOTAL FLAREDNENTED 35,629 Process upset in NGL section of facility; valve leaking to flare Unplanned Stabilized facility process and operation; started NGL injection pump Re: CPF-2 Flaring Data for November Jeff - Thanks for the clarification about flaring at CPF2, and the document summarizing general causes of flaring at CPF2. The information provided answered our questions. Seems like a very unusual temp swing for November. Jim Regg NSK Env Proj wrote: Steve/Jim: As requested, we have compiled for your review a comprehensive list of all flaring events that occurred at CPF2 from November 15th to 26th as well as some general causes for flaring at CPF2. We only had 1 flare event that lasted greater than 1 hour during this time period: Date - 11/26/03 Time - 4:42pm to 5:47pm, 65 minutes Volume - 87.43 Mscfs Description: The Prudhoe Bay NGL pipeline was shutdown resulting in an unplanned shutdown and subsequent restart of the CPF2 NGL pump. During the restart, any NGLs that have flashed in the pump case must be bled off prior to starting the pump. The 3/4-inch bleed valve did not get closed tightly after the pump case was bled off. This led to a very small amount of gaslngls bleeding off through this valve to the flare via our sump. The operations personnel identified the source of the flare, reseated the valve, and thus elíminated any further leakage. «November Flare Events Nov 15-26.xls» «Causes of Flaring at CPF2-1-04.doc» You will notice that one of the causes for flaring is rapid change in ambient temperature. During the Nov 15th to Nov 26th time frame, the ambient temperatures ranged from negative 30 degrees F to 30 degrees F with much fluctuation in between. lof2 1/30/20049:18 AM ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility CENTRAL PROCESSING FACILITY #2 Operator CONOCOPHILLIPS ALASKA, INC. Field(s) KUPARUK RIVER UNIT MonthlY ear of Disposition 12/03 Disposition Volume MCF* *Indicate contribution of each pool to total. 1. Sold 25,827 Pool Name Code Percent 2. Reinjected 5,873,463 KUPARUK RIVER UNIT 490100 88.12% . 3. Flared or vented less than 1 hour 10,913 KUPARUK RIVER UNIT MELTWATER 490140 3.80% 4. Flared or vented greater than 1 hour 1,276 ,/ KUPARUK RIVER UNIT T ABASCO 490160 0.12% ISunnlemental remrt reCluired--See 20 AAC 25.235) 5. Pilot and Purge 26,794 KUPARUK RIVER UNIT TARN 490165 7.96% 6. Used for lease operations Fuel 761,242 A..i.t 0 7. Other 0 Official Use Only--Flaring Authorization> 1 hr. TOTAL items I - 7 6.699515 1. Safety I¡Z7(p MCF 8. NGL gas equivalent produced 0 2. Lease Use MCF 9. Purchased gas 0 3. Conserv. Purposes MCF - ~ 10. Transferred from: PBU CGF (LSEOR NGLS) 926,817 1í"f~ m/Æ CPFI 1,182,885 ~ 7/V / .I -/ /' ~issioner Date 11. Transferred to: 0 Note: All volumes must be corrected to Remarks: Reinjected vol does not include volumes ofPBU NGLS aquired for LSEOR pressure of 14.65 psia and to a temperature of reflected on line 10 or Naptha used in SSEOR meter #201 60 degrees F. Report due by the 20th of the I hereby certify that the foregoing is true and correct to the best of my knowledge. month following the month of disposition. Signature: ~ Ittt ~ Title: Supervisor //19~ Authority 20 AAC 25.235. 5ap- Form 10-422 (RevIsed 4/95) CONOCOPHILLlPS ALASKA, INC. CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF #2 DECEMBER 2003 DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 12/14/2003 1530-1631 1,276 Process upset in gas section of facility Unplanned Started/restarted T/C #C2-101A TOTAL OVER 1 HOUR 1,276 PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Volumes: Greater than 1 hour Less than 1 hour Continuous Assist Pilot and Purge 1,276 10,913 o 26.794 TOTALFLAREDNENTED 38,983