Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutMilne Point / BP Exploration STATE OF ALASKA AOGCC GAS DISPOSITION FILES YEAR: 2003 FACILITY: Milne Point Central OPERATOR: BP EXPLORATION (ALASKA) IN C ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Milne Point Field(s) Milne Point Disposition Volume MCF* 1. Sold Fuel 16,018 2. Reinjected 561,822 3. Flared or vented less than 1 hour 1,776 4. Flared or vented ç¡reater than 1 hour ~ A1r7 (Supplemental report required-oSee 20 MC 25.235) 5. Pilot and Purç¡e 372 6. Used for lease operations Fuel 265,301 Assist 1 0 758 7. Other TOTAL items 1-7 856,473 8. NGL ç¡as equivalent produced 9. Purchased ç¡as 10. Transferred from: PBU CGF (NGLS) 76,429 11. Transferred to: Remarks: Reinjected volume does not include PBU NGLS used to make MI. Signature Title VV1&Q, ïM Date Z{ III fl.'} I hereby certify that the oregoing is tr e and correct to the best of my knowledge. Form 10-422 Rev. 4/95 Month/Year of Disposition Jan-03 *Indicate contribution of each pool to total. 1. Safety 42-1 MCF .5ße- 2. Lease MCF 3. Conserv. Purposes MCF i¿lð-~ . Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. · 0210612003 08:Jl Milne Point Unit Monthly Gas Flaring Incident Report For: Jan 2003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration =Volume (MSCF) = Start Time (hh:mm) Flare Assist Cause Comment 01/01/200321:59:1 00:01 0.3 0.0 01/03/200318:44:1 00:01 0.2 0.0 01/04/200306:55:1 00:05 3.1 0.0 01/04/200307:14:1 00:01 2.0 0.1 01/04/200308:44:1 00:01 0.5 0.0 01/04/200309:59:1 00:01 1.6 0.0 01/0412003 10:44:1 00:01 0.5 0.0 01/04/2003 10:57:1 00:03 2.1 0.0 01/04/2003 13:52:« 00:53 362.2 107.9 01/04/2003 14:47:t 00:13 31.7 9.5 01/04/2003 18:14:1 00:01 0.5 0.0 01/04/2003 22:26:1 00:04 4.5 0.6 01/05/200300:44:1 00:01 0.2 0.0 01/05/200304:39:1 00:06 2.5 0.0 01/05/200304:57:( 00:03 1.0 0.0 01/05/200305:12:1 00:03 1.1 0.0 01/05/2003 22:28:1 00:02 0.9 0.0 01/06/200320:43:1 00:02 0.9 0.0 01/071200322:41:1 00:04 2.1 0.0 01/071200323:11:( 00:04 5.6 0.9 01/081200304:44:« 00:01 0.4 0.0 01/0812003 18:44:1 00:01 0.5 0.0 01/091200305:14:1 00:01 0.5 0.0 01/0912003 12:58:1 00:02 0.3 0.0 01/09/2003 19:29:1 00:01 0.5 0.0 01/1012003 22:57:1 00:03 1.3 0.0 01/11/2003 11:14:1 00:01 2.4 0.2 01/11/200311:16:1 00:14 76.8 21.5 01/11/200311:37:1 00:23 148.9 71.3 01/11/2003 12:02:1 00:13 76.3 38.5 01/11/2003 12:29:1 00:01 5.1 4.3 01/11/2003 13:11:1 00:04 10.6 4.7 01/1112003 16:29:1 00:46 16.0 0.5 01/11/2003 17:18:1 00:12 4.4 0.2 01/11/200320:57:1 00:03 3.9 1.3 01/121200302:29:1 00:01 0.5 0.0 01/12/200308:03:1 00:12 3.8 0.0 01/121200308:27:1 00:03 1.1 0.0 01/12/200319:28:1 00:02 0.5 0.0 01/131200301:44:( 00:01 0.6 0.0 01/131200318:57:1 00:03 1.1 0.0 BP Exploration Page I of 4 Milne Point. Alaska ,0210612003 08:11 Milne Point Unit Monthly Gas Flaring Incident Report For: Jan 2003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration =Volume(MSCF) = Start Time (hh:mm) Flare Assist Cause Comment 01/13/2003 23:29:1 00:01 0.4 0.0 01/1412003 19:14:( 00:01 0.7 0.0 01/15/2003 22:28:1 00:02 1.0 0.0 01/161200305:29:1 00:01 0.4 0.0 01/161200319:57:1 00:03 1.2 0.0 01/1712003 20:55:t 00:05 2.7 0.3 01/181200320:59:1 00:01 0.1 0.0 01/19/2003 16:58:1 00:02 0.4 0.0 01/19/2003 17:08:1 00:07 9.3 4.2 01/19/2003 19:44:1 00:01 0.2 0.0 01/20/2003 10:48:1 00:12 12.4 5.5 01/2012003 11:11:1 00:04 1.4 0.4 01/2012003 11 :25:1 00:05 3.0 0.7 01/2012003 18:37:1 00:08 38.6 12.4 01120/2003 18:53:1 00:07 24.6 13.8 01124/2003 10:57:1 00:03 3.9 0.8 011241200311:14:( 00:01 5.2 1.9 01124/200312:12:1 00:03 2.5 0.3 01/24/2003 12:29:1 00:01 0.8 0.7 0112412003 18:28:1 00:02 1.6 0.2 011241200319:41:1 00:04 8.0 2.0 01/24/200322:23:1 00:07 9.8 1.7 01/2412003 22:38:1 00:07 8.0 2.1 01124/2003 23:58:1 00:02 2.3 0.2 01/2512003 00: 10:1 00:05 3.1 1.2 01/25/200301:29:1 00:01 0.1 0.0 011251200301 :33:1 00:12 13.3 5.3 011251200301:58:1 00:02 1.9 1.2 011251200303:58:1 00:02 0.5 0.0 01125/200304:37:1 00:08 14.8 6.8 01/27/2003 18:57:( 00:03 1.6 0.0 01/27/2003 19:12:1 00:03 3.3 1.7 01/27/200322:56:1 00:04 4.1 1.4 01/281200300:50:1 00:10 30.0 14.4 01128/200301:02:1 00:13 51.8 27.0 01128/200301: 17:1 00:13 44.8 22.3 01128/200301:33:1 00:42 201.3 98.0 01128/200302: 17:1 00:13 35.3 16.8 011281200302:33:1 00:12 43.1 22.0 01128/200302:50:1 00:10 42.2 19.2 01128/200303:01:( 00:14 53.9 19.8 BP Exploration Page 2 of 4 Milne Point. Alaska .0210612003 08:11 Milne Point Unit Monthly Gas Flaring Incident Report For: Jan 2003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration =Volume (MSCF) = (hh:mm) Flare Assist Cause Start Time Comment 01/281200303:19:1 01/28/200303:41:( 0112812003 03:50:1 01/28/200304:33:1 01/28/200304:53:1 01/281200306:43:( 00:11 00:04 00:40 00:12 00:07 00:02 45.7 13.6 173.2 47.2 32.0 1.1 17.7 5.8 66.4 18.2 13.4 0.7 BP Exploration Page 3 of 4 Milne Point. Alaska ,0210612003 08: II Milne Point Unit Monthly Gas Flaring Incident Report For: Jan 2003 Flare Name: Flare 1 Unplanned Events greater than 1 hour Duration =Volume (MSCF) = (hh:mm) Flare Assist Cause Start Time Comment 01128/200305:23:1 01:07 426.6 169.1 A backfire relief disk on the C-pad gas compressor failed causing a high temperaure shutdown. The relief disk was repaired and the compressor was restarted. Flare Assist Unplanned Events <= 1 hour 1,775.6 688.1 Unplanned Events> 1 hour Planned Events <= 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF 426.6 169.1 0.0 0.0 0.0 0.0 Unmetered Assist Gas IO,~13 . \ TOTAL FLARED VOLUME 2,202.2 U, 130.3 MSCF BP Exploration Page 4 of 4 Milne Point, Alaska ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1 . Safety 2(Zb~ MCF S~ 2. Lease MCF 890,724 3. Conserv. Purposes MCF ~L~~ tl/~)03 Comm' sioner Date Facility Milne Point Disposition Volume MCF* 1. Sold Fuel 16,750 2. Reinjected 592,250 3. Flared or vented less than 1 hour 4. Flared or vented ç¡reater than 1 hour (Supplemental report required-oSee 20 AAC 25.235) 5. Pilot and Purç¡e 6. Used for lease operations Fuel Assist 268,468 10103 7. Other TOTAL items 1-7 8. NGL ç¡as equivalent produced 9. Purchased ç¡as 10. Transferred from: PBU CGF (NGLS) 11. Transferred to: Remarks: Reinjected volume does not include PBU NGLS used to make MI. Signature Title fJ1,6 (L TAX Form 1 0-422 Rev. 4/95 Field(s) Milne Point 554 2,263 336 o Date "3/r¿/03 Month/Year of Disposition Feb-03 *Indicate contribution of each pool to total. o e Percent 525100 525150 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. 03/0612003 14:49 Milne Point Unit Monthly Gas Flaring Incident Report For: Feb 2003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration = Volume (MSCF) = Start Time (hh:mm) Flare Assist Cause Comment 02/0312003 09:41 :t 00:04 5.7 1.6 02/08/200321:09:1 00:06 7.0 2.2 02/10/2003 09:22:1 00:08 4.8 0.7 02/101200309:33:1 00:12 6.4 0.5 02/1012003 09:50:( 00:10 34.3 14.0 02/10/200314:17:1 00:13 33.8 21.4 02/11/2003 23:44:1 00:01 0.4 0.0 02/13/200303:43:1 00:02 0.8 0.0 02/14/200301:58:1 00:02 0.5 0.0 02/14/2003 18:59:1 00:01 0.4 0.0 02/1612003 18:58:1 00:02 0.3 0.0 02/17l2oo320:59:t 00:01 0.2 0.0 02/17I2oo323:57:t 00:03 5.0 2.5 02/18/200300:14:1 00:01 2.7 2.6 02/18/200301:30:1 00:30 214.2 115.4 02/18/200302:06:1 00:09 36.5 23.9 02/19/200301:28:1 00:02 0.4 0.0 02/1912003 19: 13:1 00:02 0.7 0.0 021201200319:12:1 00:03 0.9 0.0 02/21/2oo321:44:t 00:01 0.7 0.0 02/22/2003 03:24:1 00:06 9.5 5.0 02/22/2003 03:40:1 00:05 5.2 2.8 02/221200305:41:1 00:04 2.4 0.7 02/22/2oo305:52:t 00:08 18.0 9.6 02/22/2003 06: 14:1 00:01 1.0 1.2 02/2212003 06:22:1 00:08 7.5 3.8 02/22/200307: 11:1 00:04 2.0 0.4 02/22/200307:26:1 00:04 2.5 0.9 02/22/200307:44:( 00:01 0.7 0.6 02/2212003 18:58:( 00:02 0.7 0.0 021241200316:13:( 00:02 1.2 0.0 02/2412003 16:20:1 00:10 48.8 29.3 02/24/2003 16:38:1 00:07 21.7 22.5 02/24/2003 17:42:1 00:03 5.4 4.8 02/24/2003 17:55:1 00:05 5.8 5.4 02/24/2003 18: 13: 1 00:02 2.4 0.7 02/241200319:13:1 00:02 0.7 0.0 0212612003 12:37:1 00:08 6.6 1.3 02/26/2003 13: 11 :1 00:04 8.1 1.0 0212612003 13: 16:1 00:14 23.2 7.7 02126/2003 13:32:1 00:13 23.8 7.3 BP Exploration Page I of 3 Milne Point. Alaska 03/0612003 14:49 Milne Point Unit Monthly Gas Flaring Incident Report For: Feb 2003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration =Volume (MSCF) = (hh:mm) Flare Assist Cause Start Time Comment 02127/2003 14:58:1 00:02 1.2 0.0 BP Exploration Page 2 of 3 Milne Point, Alaska '03/06/2003 14:49 Milne Point Unit Monthly Gas Flaring Incident Report For: Feb 2003 Flare Name: Flare 1 Unplanned Events greater than 1 hour Duration =Volume (MSCF) = (hh:mm) Flare Assist Cause Start Time Comment 02/101200311:13:1 03:02 798.9 398.6 Vibration alarm caused unexpected shut Following turbine and gas compression down of -08 turbine. Power diverted to shutdown, high GOR wells remaining the -07 turbine caused immediate load on line were shut in. Maintenance shed and shut down. Various crews investigated and a restart equipment and wells were shed and half performed. Possible shutdown causes of the gas compression went down, are still under investigation with turbine causing unplanned flaring. manufacturer. 471.5 While thawing out frozen level control After the production plant equipment equipment on a gas vent scrubber, the was safely depressurized to the flare, extra high-level alarm switch was the facility and field were brought back accidentally tripped. A level 3 field on-line. shutdown occurred. 02126/200309:21:1 03:09 1,464.3 Flare Assist Unplanned Events <= 1 hour 553.9 290.0 Unplanned Events> 1 hour Planned Events <= 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF 2,263.2 870.1 0.0 0.0 0.0 0.0 Unmetered Assist Gas q 2.1ß. q TOTAL FLARED VOLUME 2,817.1 IO£t3Q,o MSCF BP Exploration Page 3 of 3 Milne Point. Alaska ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Milne Point Field(s) Milne Point Disposition Volume MCF* 1. Sold Fuel 18,449 2. Reinjected 718,006 3. Flared or vented less than 1 hour 1,022 4. Flared or vented ç¡reater than 1 hour 394 ¡,/ (Supplemental report required·-See 20 AAC 25,235) 5. Pilot and Purç¡e 372 6. Used for lease operations Fuel 295,885 Assist 10483 7. Other TOTAL items 1-7 1,044,611 8. NGL ç¡as equivalent produced 9. Purchased ç¡as 10. Transferred from: PBU CGF (NGLS) 0 11. Transferred to: Month/Year of Disposition Mar-03 *Indicate contribution of each pool to total. Remarks: Reinjected volume does not include PBU NGLS used to make MI. I hereby certi~at the f regoing is true and correct to the best of my knowledge. Signature {¿( . Title /'ltl,6 fl..- íA)( Date Form 1 0-422 Rev. 4/95 1 . Safety 314 MCF <r~ 2. Lease 3. Conserv. Purposes ~^'1 ~,^^-JL- '5' ßltr> Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. MCF MCF 04/07/2003 13:54 Milne Point Unit Monthly Gas Flaring Incident Report For: Mar 2003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration =Volume(MSCF) = Start Time (hh:mm) Flare Assist Cause Comment 03/01/2003 20: 17:1 00:13 35.8 3.6 03/0112003 20:37:1 00:08 13.6 1.1 03/01/200320:50:( 00:10 13.9 0.0 03/011200321:13:( 00:02 2.4 0.0 03/0212003 11 :42:1 00:03 1.9 0.0 03/02/2003 11:57:1 00:03 1.9 0.0 03/061200304:24:1 00:06 73.8 24.2 03/06/200304:35:1 00:25 193.1 93.8 03/06/200305:08:1 00:07 25.4 13.9 03/061200310:27:1 00:03 1.7 0.0 03/0612003 23:28:1 00:02 0.5 0.0 03/06/2003 23:43:1 00:02 1.5 0.1 03/061200323:48:1 00:12 10.4 4.6 03/07/2003 10:41:1 00:04 14.8 7.7 03/07/200310:55:« 00:05 11.8 6.3 03/07/2003 14:28:1 00:02 0.8 0.0 03/0712003 14:33:1 00:12 10.8 5.6 03/07/2003 14:50:1 00:10 9.2 4.9 03/07/2003 16:13:1 00:02 2.5 0.6 03/07/2003 18:22:t 00:08 7.3 2.9 03/0712003 18:42:1 00:03 1.6 0.5 03/0712003 18 :54:~ 00:06 5.1 1.9 03/0712003 19:12:1 00:03 2.0 0.4 03/07/2003 19:44:t 00:01 0.1 0.0 03/08/2003 09:43:1 00:02 0.7 0.0 03/11/2003 13:29:1 00:01 0.4 0.0 03/1112003 13:43:1 00:02 0.9 0.0 03/12/2003 11:59:1 00:01 0.0 0.0 03/12/2003 12:14:1 00:01 0.9 0.0 03/131200307: 13:1 00:02 0.7 0.0 03/14/200307:44:( 00:01 0.4 0.0 03/14/200307:59:( 00:01 0.3 0.0 03/15/2003 10:43:t 00:02 0.8 0.0 03/161200309:28:1 00:02 0.9 0.0 03/171200313:58:( 00:02 1.0 0.0 03/171200315:13:1 00:02 67.1 0.8 03/17/2003 15:18:1 00:12 50.4 9.9 03/181200306:43:1 00:02 0.2 0.0 03/1812003 08:29:( 00:01 0.6 0.0 03/1812003 21 :21 :1 00:09 8.7 3.5 03/1812003 21 :46:1 00:14 15.7 6.8 BP Exploration Page I of 4 Milne Point, AlaskD 04/0712003 13:54 Milne Point Unit Monthly Gas Flaring Incident Report For: Mar 2003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration = Volume (MSCF) = Start Time (hh:mm) Flare Assist Cause Comment 03/1812003 22: 10:1 00:05 2.4 1.6 03/181200323:10:1 00:05 7.4 2.3 03/18/200323:24:( 00:06 4.8 2.8 03/18/200323:35:1 00:10 9.5 4.3 03/18/200323:47:1 00:13 19.9 9.3 03/19/2003 00:09:1 00:06 3.1 1.7 03/19/200300:49:1 00:11 12.5 5.6 03/19/200301:25:1 00:05 6.4 2.5 03/191200301:38:' 00:07 5.0 1.9 03/19/200301:48:1 00:12 9.7 4.3 03/191200303:26:1 00:04 2.9 0.8 03/191200303:39:( 00:06 3.4 1.0 03/19/200303:51:1 00:09 15.1 7.1 03/19/200304:41:1 00:04 7.6 2.4 03/19/200304:59:( 00:01 1.6 1.5 03/19/200305:56:1 00:04 6.7 2.7 03/19/2003 10:58:1 00:02 0.7 0.0 03/21/2003 11:08:1 00:07 6.9 2.3 03/2112003 11: 17:1 00:13 5.5 1.7 03/2112003 11:42:1 00:03 1.9 1.1 03/21/2003 13:58:1 00:02 0.6 0.0 03/21/2003 17:41:1 00:04 1.7 0.1 0312112003 20:46:1 00:14 35.4 17.0 03/21/200321:04:( 00:26 78.0 37.9 03121/200321:43:1 00:02 2.6 1.7 03/211200321:54:1 00:06 8.9 3.7 03/21/200322:01 :1 00:14 22.7 11.5 03/21/200322:55:1 00:05 10.0 4.3 03/21/200323:29:( 00:16 22.1 9.7 03121/200323:51:1 00:09 20.8 ILl 03/221200301:34:1 00:11 9.5 3.5 03/2212003 01 :54:( 00:06 5.2 3.0 03/2212003 02:38:1 00:07 9.1 3.7 03/22/2003 03:39:1 00:06 8.8 3.8 03122/2003 04:20:1 00:10 13.2 4.7 0312212003 04:42:1 00:03 6.3 4.1 0312212003 05: 19:1 00:11 15.3 6.5 03/22/200305:39:1 00:06 8.5 4.7 0312212003 06: 11 :1 00:04 2.4 0.3 03/221200306:25:1 00:05 8.1 3.0 0312212003 07: 14:1 00:01 0.4 0.0 BP Exploration Page 2 of 4 Milne Point. Alaska 04/07/2003 13:54 Milne Point Unit Monthly Gas Flaring Incident Report For: Mar 2003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration = Volume (MSCF) = Start Time (hh:mm) Flare Assist Cause 03/23/200309:58:1 00:02 0.7 0.0 03/241200307:43:1 00:02 0.5 0.0 03/251200323:29:1 00:01 0.3 0.0 03/28/2003 17:58:1 00:02 1.1 0.0 03128/2003 18:08:1 00:07 5.3 2.4 Comment BP Exploration Page 3 of 4 Milne Point. Alaska 0410712003 13:54 Milne Point Unit Monthly Gas Flaring Incident Report For: Mar 2003 Flare Name: Flare 1 Unplanned Events greater than 1 hour Duration =Volume (MSCF) = (hh:mm) Flare Assist Cause Start Time Comment 03/21/200308:42:1 01:48 393.8 195.9 An emergency shutdown of the Big A Operations and Engineering staff are gas lift compressor was required to evaluating the cracked pipe to repair a crack in piece of pipe leading to determine the cause. Corrective action a process safety valve. Twenty three recommendations will be developed high gas producing wells were shut in to from the evaluation. minimize the flaring. Flare Assist Unplanned Events <= 1 hour 1,022.0 386.4 Unplanned Events> 1 hour Planned Events <= 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF 393.8 195.9 0.0 0.0 0.0 0.0 Unmetered Assist Gas 102.73.\ TOTAL FLARED VOLUME 1,415.8 10 ß 5S. &f MSCF BP Exploration Page 4 of 4 Milne Point, Alaska ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Milne Point Disposition 1. Sold 2. Reinjected 3. Flared or vented less than 1 hour 4. Flared or vented ç¡reater than 1 hour (Supplemental report requlred--See 20 AAC 25.235) 5. Pilot and Purç¡e 6. Used for lease operations 7. Other TOTAL items 1-7 8. NGL ç¡as equivalent produced 9. Purchased ç¡as 10. Transferred from: PBU CGF (NGLS) 11. Transferred to: Operator BP Exploration (Alaska Inc. Volume MCF* Fuel 17,773 758,480 Fuel Assist 282,390 1 0 256 1,072,598 Remarks: Reinjected volume does not include PBU NGLS used to make MI. is true and correct to the best of my knowledge. Form 10-422 Rev. 4/95 Title Y/.1k>fG ~ Field(s) Milne Point 1,233 2,106 360 o Date 6- 8 *Indicate contribution of each pool to total. 1 . Safety 2 \ ójo MCF ~ 2. Lease 3. Conserv. Purposes !<A-tJ.¡ ~~ 1.ø/¿'f/b3 Commissioner Dat~ Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. MCF MCF · 05/0612003 12: 17 Milne Point Unit Monthly Gas Flaring Incident Report For: Apr 2003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration =Volume (MSCF) = Start Time (hh:mm) Flare Assist Cause 04/02/2003 16:40:1 00:05 10.0 3.0 04/02/2003 16:58:1 00:02 1.5 0.7 04/02/2003 20:46:1 00:14 29.1 13.8 04/031200307:39:1 00:06 3.7 0.5 04/03/200307:58:1 00:02 1.9 1.5 04/03/200309:10:1 00:05 2.1 0.0 04/03/200309:27:1 00:18 27.8 4.4 04/0312003 09:59:1 00:01 1.2 0.3 04/03/2003 13:38:t 00:07 13.6 1.9 04/03/2003 13:49:1 00:11 13.7 2.5 04/0412003 17:22:t 00:08 8.2 0.7 04/041200320:23:1 00:07 4.2 0.0 04/0512003 03:28:t 00:02 1.8 0.0 04/051200303:37:1 00:08 10.3 1.3 04/051200306:17:1 00:13 9.2 0.4 04/05/2003 06:34:1 00:11 6.8 0.0 ~ 04/061200307:19:( 00:11 59.0 12.8 04/0612003 10:26:t 00:04 2.2 0.0 04/06/2003 10:41:1 00:04 3.1 0.0 04/06/2003 10:56:1 00:04 2.1 0.0 04/06/2003 11:13:1 00:02 0.7 0.0 04/0612003 11:25:1 00:05 1.7 0.0 04/0612003 11 :42:1 00:03 1.3 0.0 04/0612003 11 :56:1 00:04 2.4 0.0 04/0612003 12: l1:t 00:04 3.0 0.0 04/06/200312:42:1 00:03 1.1 0.0 04/06/2003 12:56:( 00:04 2.2 0.0 04/06/2003 13:12:1 00:03 1.8 0.0 04/06/2003 13:24:1 00:06 3.3 0.0 04/0612003 13:43:1 00:02 1.4 0.0 04/06/2003 14:26:1 00:04 3.3 0.0 04/06/2003 14:41:1 00:04 2.0 0.0 04/0612003 14:56:( 00:04 2.5 0.0 04/06/2003 16:40:( 00:05 3.4 0.0 04/06/2003 16:56:1 00:04 2.6 0.0 04/061200317:12:1 00:03 1.6 0.0 04/06/200317:28:1 00:02 1.6 0.0 04/06/2003 17:38:1 00:07 2.5 0.0 04/0612003 17 :57:( 00:03 1.1 0.0 04/06/2003 18:07:( 00:08 66.9 25.2 04/0612003 18:28:1 00:02 10.5 9.2 BP Exploration Page I of9 Comment 4(/0 -7 ~ v.X r.e --5te .se re/~ 4(b(03 (~~3~ t.LvyJ~ (5tt..8s:llil.,JdQ~ ~ .h fd1 ¿;-.. dt~¿J( pft'b ðlAe eM.. <jas C~æg5co-C-~I~I_ ? .!J I 5&(Z. 6\ 17t1>;' Milne Point. Alask" · 05/0612003 12:17 Milne Point Unit Monthly Gas Flaring Incident Report For: Apr 2003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration =Volume(MSCF) = Start Time (hh:mm) Flare Assist Cause Comment 04/06/2003 18:56:1 00:04 3.4 1.0 04/06/200319:12:1 00:03 1.4 0.0 Á-'{ b{ 03 04/0612003 20:44:( 00:01 0.7 0.0 t 10, 4 µCJ2 04/06/2003 21 :28:1 00:02 0.5 0.0 04/0612003 21 :44:1 00:01 0.2 0.0 +-/7/ì5'3 ¿fl Z- JA-CÝ 04/061200321:58:1 00:02 0.9 0.0 04/07/2003 01 : 12:1 00:03 3.2 0.8 04/07/200301:26:1 00:04 3.0 1.2 04/071200302:27:1 00:03 2.8 0.7 "3 '37" <e f-\.c.F 04/071200302:58:1 00:02 1.3 0.0 ::58 (L. 04/07/200303:12:1 00:03 2.1 0.4 \0\ \'b\l)~ 04/07/2oo305:12:t 00:03 1.8 0.2 04/071200306:58:1 00:02 1.4 0.0 04/07/200307:11:1 00:04 2.1 0.6 04/07/200307:43:1 00:02 1.6 0.1 04/07/200309:12:( 00:03 1.4 0.0 04/071200309:28:1 00:02 0.5 0.0 04/071200309:58:1 00:02 1.6 0.0 04/0712003 10:57:1 00:03 2.2 0.4 04/0712003 11:28:1 00:02 1.0 0.0 04/07/2003 11 :57:1 00:03 2.0 0.2 04/0712003 15:57:t 00:03 29.2 2.8 04/0712003 16:07:t 00:08 41.7 15.4 04/07/2003 16:58:t 00:02 0.8 0.0 04/07/2003 17:06:1 00:09 10.4 0.4 04/07/2003 18:06:( 00:09 9.3 0.6 04/07/200318:28:1 00:02 2.5 0.0 04/0712003 18:40:1 00:05 4.1 0.0 04/0712003 19:08:1 00:07 6.8 0.5 04/07/2003 19:27:1 00:03 2.2 0.0 04/07/200320:12:1 00:03 1.8 0.0 04/071200320:28:1 00:02 1.9 0.0 04/071200321:26:1 00:04 5.2 0.2 041 7/200323:26:1 00:04 3.3 0.0 04/08/200303:42:1 00:03 2.5 0.0 04/09/2003 04:42:1 00:03 0.8 0.0 04/10/2003 05:28:1 00:02 0.9 0.0 04/111200300: 14:( 00:01 0.2 0.0 04/1112003 15:44:1 00:01 0.5 0.0 04/121200302:58:1 00:02 0.7 0.0 04/1312003 00:44:( 00:01 0.0 0.0 BP Exploration Page 2 of9 Milne Point. Alaska · 05/0612003 12:17 Milne Point Unit Monthly Gas Flaring Incident Report For: Apr 2003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration =Volume(MSCF) = Start Time (hh:mm) Flare Assist Cause Comment 04/13/200300:58:1 00:02 1.0 0.0 04/131200315:14:( 00:01 0.1 0.0 04/13/2003 15:27:1 00:03 1.3 0.0 04/13/2003 18:39:1 00:06 8.9 1.1 04/131200319:14:1 00:01 0.3 0.0 04/1312003 19:27:1 00:03 1.8 0.0 04/1312003 19:44:1 00:01 0.1 0.0 04/1312003 19:57:( 00:03 2.2 0.0 04/13/2003 20: 11:1 00:04 2.7 0.0 04/131200320:58:1 00:02 1.1 0.0 04/1312003 21: 10:1 00:05 1.7 0.0 04/131200321:28:1 00:02 1.0 0.0 04/131200321:58:1 00:02 0.7 0.0 04/13/2003 22: 12:t 00:03 1.4 0.0 04/131200322:26:1 00:04 2.2 0.0 04/13/2003 22:56:1 00:04 1.8 0.0 04/13/2003 23: 12:1 00:03 1.7 0.0 04/13/2003 23:27:1 00:03 2.0 0.0 04/131200323:58:1 00:02 1.8 0.0 04/1412003 00: 11 :1 00:04 3.0 0.0 04/14/200300:41:1 00:04 2.4 0.0 04/14/200301:12:1 00:03 1.9 0.0 04/14/200301:26:1 00:04 2.5 0.0 04/14/200301 :57:t 00:03 1.6 0.0 04/14/200302:14:1 00:01 0.1 0.0 04/14/200302:27:1 00:03 2.1 0.0 04/14/200302:43:1 00:02 1.5 0.0 04/14/2003 03: 13:( 00:02 1.1 0.0 04/14/200303:27:1 00:03 1.9 0.0 04/14/200303:42:1 00:03 2.0 0.0 04/14/200304:12:( 00:03 1.4 0.0 04/14/200304:26:1 00:04 2.7 0.0 04/14/200304:44:1 00:01 0.9 0.0 04/14/2003 04:59:1 00:01 0.5 0.0 04/14/200305:26:( 00:04 2.6 0.0 04/141200305:44:1 00:01 0.1 0.0 04/14/200305:58:1 00:02 2.5 0.0 041141200306:43:1 00:02 1.5 0.0 04/14/200306:57:1 00:03 2.9 0.0 04/14/200307:27:( 00:03 2.4 0.0 04/141200307:57:( 00:03 2.0 0.0 BP Exploration Page 3 of9 Milne Point. AlaskD ·0510612003 12: 17 Milne Point Unit Monthly Gas Flaring Incident Report For: Apr 2003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration =Volume (MSCF) = (hh:mm) Flare Assist Cause Start Time Comment 04/14/200308:28:1 04/141200308:41 :( 04/1412003 09: 12:( 04/14/2003 09:43:1 04/141200309:57:1 04/14/2003 10:42:1 04/14/2003 10:59:1 04/14/2oo311:14:t 04/1412003 11:27:1 04/1412003 11:43:1 04/1412003 11 :59:1 04/1412003 12:12:1 04/14/2003 12:27:1 04/14/2003 12:43:4 04/14/2003 12:57:1 04/14/2003 13:26:1 04/1412003 13:44:( 04/14/2003 13:58:1 04/1412003 14:12:1 04/14/2003 14:42:t 04/1412003 14:56:1 04/1412003 15:11:1 04/1412003 15:28:( 04/14/2003 15:43:« 04/1412003 15:57:1 04/1412003 16:07:1 04/14/2003 16:23:1 04/1412003 16:37:1 04/1412003 16:54:1 04/14/2003 17:06:1 04/14/200317:21:1 04/14/2003 17:37:( 04/1412003 17:57:1 04/14/2003 18: 11:1 04/14/2003 18:26:( 04/14/2003 18:41:t 04/14/2003 18:54:( 04/1412003 19: 10:1 04/14/200319:21 :1 04/14/2003 19:40:( 04/1412003 19:57:1 00:02 00:04 00:03 00:02 00:03 00:03 00:01 00:01 00:03 00:02 00:01 00:03 00:03 00:02 00:03 00:04 00:01 00:02 00:03 00:03 00:04 00:04 00:02 00:02 00:03 00:08 00:07 00:08 00:06 00:09 00:09 00:08 00:03 00:04 00:04 00:04 00:06 00:05 00:09 00:05 00:03 0.7 2.6 1.9 1.5 2.4 1.8 0.6 1.1 1.4 1.0 0.5 2.5 1.9 1.5 2.5 2.3 0.4 1.7 2.0 1.5 3.0 3.3 1.2 2.0 2.6 5.7 5.2 4.0 3.2 5.1 6.2 4.6 1.2 3.6 3.1 3.2 3.2 2.8 6.2 3.7 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 BP Exploration Milne Point. Alaska Page 4 of9 -05/0612003 12:17 Milne Point Unit Monthly Gas Flaring Incident Report For: Apr 2003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration = Volume (MSCF) = Start Time (hh:mm) Flare Assist Cause Comment 04/14/200320:12:1 00:03 2.0 0.0 04/14/200320:28:( 00:02 2.2 0.0 04/14/2003 20:41:1 00:04 3.1 0.0 04/14/2003 20:59:1 00:01 0.5 0.0 04/14/2003 21 :09:( 00:06 4.1 0.0 04/14/200321:26:1 00:04 2.5 0.0 04/14/2003 21 :41:1 00:04 3.0 0.0 04/14/200321:57:1 00:03 2.2 0.0 04/141200322: 14:t 00:01 0.8 0.0 04/1412003 22:26:1 00:04 3.8 0.0 04/1412003 22:41:1 00:04 3.0 0.0 04/14/200322:58:1 00:02 0.8 0.0 04/14/200323:14:1 00:01 0.5 0.0 04/14/2003 23:28:1 00:02 2.1 0.0 04/141200323:41:( 00:04 3.4 0.0 04/14I2oo323:59:t 00:01 0.5 0.0 04/151200300:13:( 00:02 0.7 0.0 04/15/200301:58:( 00:02 1.6 0.0 04/15/200302:12:1 00:03 1.7 0.0 04/1512003 03: 11:( 00:04 2.6 0.0 04/15/200303:41:« 00:04 2.8 0.0 04/15/2003 18:20:1 00:10 8.0 0.5 04/15/2003 18:37:1 00:08 9.3 1.2 04/15/2oo319:13:t 00:02 1.1 0.0 04/1512003 19:23:( 00:07 8.0 0.9 04/151200321:14:1 00:01 1.1 0.0 04/15/2003 21: 17 :( 00:13 9.0 0.4 04/1512003 22:26:1 00:04 1.0 0.0 04/16/200301:29:1 00:01 1.0 0.0 04/161200309:13:1 00:02 0.8 0.0 04/161200309:58:1 00:02 0.8 0.0 04/1612003 10:25:( 00:05 3.7 0.0 04/16/2003 10:42:1 00:03 1.8 0.0 04/16/2003 11:27:1 00:03 1.4 0.0 04/16/2003 11:57:1 00:03 2.0 0.0 04/16/2003 12: 1 3:t 00:02 1.0 0.0 04/1612003 12:29:1 00:01 0.9 0.0 04/16/2003 12:42:1 00:03 1.4 0.0 04/16/200313:13:1 00:02 0.6 0.0 04/161200320:28:1 00:02 0.7 0.0 04/17/2003 19:57:1 00:03 1.2 0.0 BP Exploration Page 5 of9 Milne Point. Alask;' 05/06/2003 12:17 Milne Point Unit Monthly Gas Flaring Incident Report For: Apr 2003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration = Volume (MSCF) = Start Time (hh:mm) Flare Assist Cause Comment 04/18/2003 11 :34:1 00:11 85.2 23.3 04/1812003 11:46:1 00:14 48.9 31.3 04/18/2003 12:56:( 00:04 8.5 5.0 04/18/200313:10:1 00:05 6.0 3.6 04/18/2003 13:34:1 00:11 13.4 8.0 04/18/2003 13:52:( 00:08 7.8 5.5 04/1812003 14:07:1 00:08 8.4 4.7 04/1812003 14:22:1 00:08 6.8 4.7 04/1812003 14:34:1 00:11 9.7 6.8 04/181200314:51:1 00:09 10.0 6.5 04/18/2003 15:05:1 00:10 16.9 10.5 04/18/2003 15:25:1 00:05 7.7 5.9 04/181200317:58:1 00:02 0.9 0.0 04/181200318:13:1 00:02 2.3 0.8 04/18/2003 18:28:1 00:02 1.1 0.0 04/1812003 18:55:1 00:05 4.6 0.0 04/1812003 19: 10:1 00:05 3.0 0.0 04/1812003 19:24:1 00:06 2.6 0.0 04/18/2003 19:38:1 00:07 4.3 0.0 04/1812003 19:53:1 00:07 4.5 0.0 04/181200320:10:1 00:05 4.1 0.0 04/181200320:55:1 00:05 3.7 0.0 04/181200321:11:1 00:04 3.7 0.0 04/18/200321:25:4 00:05 3.6 0.0 04/1812003 21 :56:t 00:04 3.3 0.0 04/19/2003 08:44:( 00:01 0.5 0.0 04/19/2003 08:59:( 00:01 1.0 0.0 04/19/2003 10:28:1 00:02 1.7 0.0 04/19/2003 13:43:1 00:02 1.1 0.0 04/1912003 15:57:1 00:03 2.3 0.6 04/19/200316:12:1 00:03 2.5 0.9 04/19/2003 16:27:1 00:03 2.1 0.7 04/19/2003 16:42:1 00:03 2.0 0.5 04/191200318:13:1 00:02 1.5 0.2 04/19/2003 19:28:4 00:02 1.0 0.0 04/19/200321:44:1 00:01 0.5 0.0 04/19/2003 21 :59:( 00:01 1.0 0.2 04/19/2003 22:44:( 00:01 0.5 0.0 04/19/2003 22:59:1 00:01 0.9 0.0 04/191200323:27:( 00:03 1.7 0.4 04/19/200323:58:1 00:02 1.1 0.0 BP Exploration Page 6of9 Milne Point, Alaska · 05/0612003 12:17 Milne Point Unit Monthly Gas Flaring Incident Report For: Apr 2003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration =Volume (MSCF) = Start Time (hh:mm) Flare Assist Cause Comment 04/20/200300:27:1 00:03 2.0 0.5 04/20/2003 00:58:( 00:02 1.1 0.0 04/20/200301:27:1 00:03 1.5 0.3 04/20/2003 03:43:1 00:02 0.9 0.0 04/20/2oo304:43:t 00:02 1.4 0.1 04/201200305:43:1 00:02 0.9 0.0 04/2012003 06:59:1 00:01 0.3 0.0 041201200307:14:1 00:01 0.0 0.0 04/20/200307:29:1 00:01 0.7 0.0 041201200307:43:1 00:02 1.4 0.2 04120/200308:28:1 00:02 0.7 0.0 04/20I2oo308:58:t 00:02 1.3 0.1 04120/2003 09: 13:t 00:02 0.9 0.0 04/2012003 09:58:( 00:02 1.3 0.0 04/2012003 1O:27:t 00:03 1.7 0.4 0412012003 11: 13:1 00:02 1.4 0.3 0412012003 11:27:1 00:03 2.0 0.7 04/2012003 11:58:1 00:02 0.9 0.1 04/20/2003 12:28:t 00:02 1.2 0.3 04/2012003 13: 13:1 00:02 1.2 0.4 04/20/2003 13:58:1 00:02 1.5 0.7 04/201200314:12:1 00:03 2.2 1.4 0412012003 14:28:1 00:02 1.1 0.4 04120/2oo315:13:t 00:02 1.3 0.4 04120/2003 15:43:1 00:02 1.2 0.4 04/20/2003 15:59:1 00:01 1.0 0.3 04/20/200316:14:1 00:01 0.9 0.1 04/2012003 16:58:( 00:02 0.7 0.0 04/20/200317:14:1 00:01 0.3 0.0 04/20/2003 17:43:1 00:02 1.9 1.1 04/20/2003 18:12:1 00:03 1.7 0.9 04/20/2003 18:28:1 00:02 1.2 0.3 04/20/2003 19:29:1 00:01 0.1 0.0 04/20/2003 19:44:1 00:01 1.0 0.4 04120/2003 20:28:1 00:02 1.5 0.7 04/20/2003 21 :28:1 00:02 1.1 0.3 04/20/2003 21 :43:( 00:02 1.4 0.7 0412012003 23:28:1 00:02 1.5 0.7 04121/200300:28:( 00:02 1.1 0.3 04121/200301 :42:1 00:03 1.5 0.7 04/21/200302:13:1 00:02 1.1 0.4 BP Exploration Page 7 of9 Milne Point. Alasb , 05/0612003 12: 17 Milne Point Unit Monthly Gas Flaring Incident Report For: Apr 2003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration =Volume (MSCF) = Start Time (hh:mm) Flare Assist Cause 04/21/200302:43:( 00:02 0.7 0.0 04/21/200303:43:1 00:02 1.4 0.6 04/21/200305:28:1 00:02 2.2 1.1 041211200305:44:1 00:01 0.2 0.2 04/21I2oo305:59:t 00:01 0.8 0.3 04121/200306:28:1 00:02 2.2 1.0 04121/200307:58:1 00:02 1.0 0.3 04/2112003 22:58:1 00:02 0.9 0.1 0412212003 11 :44:1 00:01 2.0 0.3 0412212003 11 :55:« 00:05 25.3 23.7 04/2212003 12:14:t 00:01 0.2 0.0 04122/2003 12:24:t 00:06 4.0 3.1 0412212003 12:38:1 00:07 12.5 10.5 04125I2oo320:53:t 00:07 8.8 7.3 041261200303:07:1 00:08 54.2 11.8 041271200307:24:1 00:06 4.1 0.0 04/27I2oo307:40:t 00:05 2.9 0.0 Comment BP Exploration Page8of9 Milne Point. Alaska ,05/0612003 12: 17 Milne Point Unit Monthly Gas Flaring Incident Report For: Apr 2003 Flare Name: Flare 1 Unplanned Events greater than 1 hour Duration =Volume (MSCF) = (hh:mm) Flare Assist Cause Start Time Comment 041261200301:50:« 01:10 691.1 225.6 Unplanned gas plant shutdown due to Gas compressors were purged high discharge pressure on gas immediately and brought back on line. compressor C-5501111B. Cooling fan Cooling fan maintenance will attempt to was shut down for annual maintenance be coordinated with planned gas and caused an increase in the gas temp, compressor shutdowns. causing high pressure in the compressor. 147.2 An emergency shutdown of the Big A Operations and engineering staff are gas lift compressor was required to evaluating the cracked pipe to repair a crack in piece of pipe leading to determine the cause. Corrective action a process safety valve. Three wells were recommendations will be developed shut in to minimize the flaring. from the evaluation. 04/06/200305:23:1 01:52 1,415.3 Flare Assist Unplanned Events <= 1 hour 1,232.6 301.5 Unplanned Events> 1 hour Planned Events <= 1 hour and not exceeding 5,000 MCF 2,106.4 372.9 0.0 0.0 Planned Events> 1 hour or exceeding 5,000 MCF 0.0 0.0 Unmetered Assist Gas ~1C¡1.t1.7 TOTAL FLARED VOLUME 3,338.9 IO,~I~.1 MSCF BP Exploration Page 9 of 9 Milne Point. Alaska ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Milne Point Inc. Field(s) Milne Point Disposition Volume MCF* 1. Sold Fuel 18,388 2. Reinjected 737,733 3. Flared or vented less than 1 hour 299 4. Flared or vented ç¡reater than 1 hour 0 (Supplemental report required--See 20 AAC 25.235) 5. Pilot and Purç¡e 372 6. Used for lease operations Fuel 294,187 Assist 9983 7. Other TOTAL items 1-7 1,060,962 8. NGL ç¡as equivalent produced 9. Purchased ç¡as 10. Transferred from: PBU CGF (NGLS) 0 11. Transferred to: Remarks: Reinjected volume does not include PBU NGLS used to make MI. I hereby certify that t Signature (2. Q true and correct to the best of my knowledge. Date Title YJIL.(,(l. T?\)(" Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name l;ooe Percent KUPARUK 525100 41.8 1::il;H. I:ILUr-r- bl.ö SAG RIVER 525150 0.4 IUl:iNU V.V 1 . Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. 0610612003 07:53 Milne Point Unit , Monthly Gas Flaring Incident Report For: May 2003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration =Volume(MSCF) = Start Time (hh:mm) Flare Assist Cause Comment 05/01/2003 11:14:1 00:01 0.5 0.0 0510112003 11:24:( 00:06 5.7 0.2 05106/2003 14:13:1 00:02 1.0 0.0 05107/200307:43:1 00:02 1.0 0.0 05/0812003 07:28:1 00:02 0.9 0.0 05/09/200303:40:1 00:20 29.1 6.6 05/09/2003 04: 11:( 00:04 4.7 3.3 05/09/200309:27:( 00:03 1.2 0.0 05/1012003 08:41:( 00:04 1.6 0.0 05/11/2003 17:29:1 00:01 0.9 0.0 05112/2003 13:59:1 00:01 0.2 0.0 051121200314:14:1 00:01 0.6 0.2 05113/2003 13:58:1 00:02 0.7 0.0 05/15/2003 15:58:1 00:02 1.2 0.0 05/16/200309:58:1 00:02 1.1 0.0 05/1712003 13:44:1 00:01 0.7 0.0 05/18/200307:58:1 00:02 0.9 0.0 05/1812003 19:53:1 00:07 8.4 0.7 05/18/2oo321:1l:f 00:04 5.2 0.3 05/191200300:26:( 00:04 3.6 0.0 05/19/200300:43:1 00:02 1.8 0.3 051191200301:43:1 00:02 0.5 0.0 05/191200301:54:1 00:06 10.4 1.4 05/19/200302:33:1 00:12 12.8 2.6 05119/200302:58:1 00:02 1.5 1.6 05119/200303:53:1 00:07 13.9 7.7 05/19/2003 04:29:1 00:01 0.3 0.0 05/191200305: 10:1 00:05 2.7 0.0 05119/2003 07:13:1 00:02 1.4 0.0 05119/200307:23:1 00:07 7.6 0.8 05/19/200307:55:( 00:05 3.7 0.0 05119/2003 08: 12:1 00:03 0.9 0.0 05/19/200308:20:1 00:10 14.4 1.5 05/191200308:40:1 00:05 5.5 0.8 OS/26/200301: 12:1 00:03 1.9 0.0 05/26/2003 0 1:22:( 00:08 5.5 0.0 0512712003 0 1:07:( 00:08 6.3 0.2 0512712003 12: 17:1 00:13 12.5 1.2 OS/27/2003 13: 12:1 00:03 5.0 0.2 0512712003 13:28:1 00:02 3.8 0.9 OS/27/2003 13:59:1 00:01 0.2 0.0 BP Exploration Page lof2 Milne Point, Alaska 06106/2003 07:53 Milne Point Unit Monthly Gas Flaring Incident Report For: May 2003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration =Volume (MSCF) = Start Time (hh:mm) Flare Assist Cause 05128/2003 11 :58:1 00:02 1.1 0.0 OS/2812003 13:39:1 00:06 13.0 1.9 OS/2812003 15:42:( 00:03 1.7 0.0 OS/28/2003 15:55:1 00:05 1.8 0.0 05128/2003 16:57:1 00:03 2.0 0.0 05128/2003 17 :41:1 00:04 6.8 0.7 OS/28/2003 19:38:1 00:07 6.3 0.3 05/30/2003 12:44:1 00:01 0.3 0.0 05/30/2003 12:57:( 00:03 0.5 0.0 05/31/2003 14:36:1 00:09 13.2 1.8 05/31/200316:12:1 00:03 1.2 0.0 05/31/2003 16:29:1 00:01 0.6 0.0 05/31/200316:38:( 00:07 7.9 0.8 05/3112003 18:38:1 00:07 7.2 2.7 05/3112003 19:39:1 00:06 11.0 4.9 05/3112003 20:36:( 00:09 6.1 5.2 05/31/2003 21 :23:1 00:07 14.9 12.5 05/31/200321:43:1 00:02 3.6 5.4 05/3112003 22:23:1 00:07 6.8 5.7 05/31/2003 22:42:( 00:03 1.8 2.2 05/3112003 23:23:1 00:07 8.8 7.6 Comment Flare Assist Unplanned Events <= 1 hour 298.5 82.2 Unplanned Events> 1 hour Planned Events <= 1 hour and not exceeding 5,000 MCF 0.0 0.0 0.0 0.0 Planned Events> 1 hour or exceeding 5,000 MCF 0.0 0.0 102.73. , ~ Unmetered Assist Gas TOTAL FLARED VOLUME 298.5 'o,?>SS.3 MSCF BP Exploration Page 2 of 2 Milne Point. Alaska ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Milne Point Disposition Volume MCF* 1. Sold Fuel 17,664 2. Reinjected 751,332 3. Flared or vented less than 1 hour 4. Flared or vented ç¡reater than 1 hour (Supplemental report required--See 20 AAC 25.235) 5. Pilot and Purç¡e 6. Used for lease operations Fuel Assist .. '~J 5 / 275,901 10350 7. Other TOTAL items 1-7 1,057,566 8. NGL ç¡as equivalent produced 9. Purchased ç¡as 10. Transferred from: PBU CGF (NGLS) 11. Transferred to: Remarks: Reinjected volume does not include PBU NGLS used to make MI. Signature Title (/Ah~ "f~ Form 1 0-422 Rev. 4/95 Field(s) Milne Point 1,245 714 360 o Date l/,o{c)~ Month/Year of Disposition Jun-03 *Indicate contribution of each pool to total. o e Percent 525100 525150 1'4- MCF Jg,a- MCF MCF 1. Safety 2. Lease Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. '07107/2003 08:27 Milne Point Unit Monthly Gas Flaring Incident Report For: Jun 2003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration =Volume (MSCF) = Start Time (hh:mm) Flare Assist Cause Comment 06/0212003 14:40:t 00:05 7.6 8.7 06/0212003 14:57:1 00:03 1.2 0.6 06/02/2003 15:25:1 00:05 3.1 2.5 06/0212003 15:53:1 00:07 40.5 39.8 0610212003 16:09:1 00:06 7.1 6.8 0610212003 17:29:1 00:01 0.0 0.0 0610312003 17:25:1 00:05 9.7 9.1 06/03/200322:14:1 00:01 0.4 0.0 0610412003 23:29:1 00:01 0.7 0.0 06/05/200316:14:1 00:01 0.7 0.1 0610512003 20:40:1 00:05 4.4 3.8 06/0612003 00:22:1 00:08 10.8 10.1 061061200301:11:1 00:04 1.9 1.2 0610612003 01 :57:1 00:03 1.9 0.7 06/06/2oo302:02:t 00:13 6.6 6.6 0610612003 02:53:1 00:07 11.1 10.2 061061200303:13:1 00:02 0.8 0.0 06/061200304:07:1 00:08 6.9 2.7 06/06/200304:43:1 00:02 1.3 0.0 0610612003 18:28:1 00:02 1.3 0.0 06107/2003 15:04:t 00:11 56.1 26.7 0610712003 15: 17:1 00:13 17.2 8.9 06/07/2003 15:42:( 00:03 1.3 0.6 0610712003 16:44:t 00:01 0.5 0.0 06107/2003 16:52:1 00:08 7.8 3.4 06/071200322:13:1 00:02 1.2 0.0 06/081200309:57:( 00:03 5.0 1.9 06/08/2003 14:39:1 00:06 4.1 1.3 06/08/2003 14:52:1 00:08 11.3 5.0 06/08/2003 15:11:1 00:04 1.2 0.0 06/08/2003 15:22:1 00:08 4.3 1.1 06/08/2003 15:37:1 00:08 2.6 0.2 06/0812003 16:10:1 00:05 3.0 0.6 06/08/2003 16: 17:1 00:13 26.2 12.0 06/08/2003 16:37:1 00:08 5.0 2.8 06/08/2oo317:19:t 00:11 11.0 4.1 06108/200317:43:1 00:02 1.9 1.4 06/0812003 18:13:1 00:02 3.4 0.7 06/08/200318:19:1 00:11 20.9 10.0 0610812003 18:38:1 00:07 7.8 4.4 .06/0812003 18:58:1 00:02 0.8 0.0 BP Exploration Page I of 4 Milne Point. Alaska · 0710712003 08:27 Milne Point Unit Monthly Gas Flaring Incident Report For: Jun 2003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration =Volume (MSCF) = (hh:mm) Flare Assist Cause Start Time Comment 06/08/2003 19:43:1 06/08/2003 19:54:1 06/08/2003 20: 10:1 06/08/200320:25:1 06/081200321:10:1 06/0812003 22:28:1 06/0812003 22:39:t 06/081200323:55:1 061091200321:58:4 0611012003 19:28:1 06/1112003 03:40:1 061111200303:56:1 06/11/2003 14:36:1 06/U/2oo3 14:54:1 06/11/200321:42:( 061121200322:58:1 061131200320:59:1 06/1412003 18:44:1 06/14/2003 18:59:1 06114/2003 19:11:t 06I14I2oo321:09:t 06/14I2oo321:28:t 06/141200321:41:1 06114/200322:12:. 06/16I2oo321:44:t 06/16/200321:59:1 06/25/2003 12:55:1 00:02 00:06 00:05 00:05 00:05 00:02 00:06 00:05 00:02 00:02 00:05 00:04 00:09 00:06 00:03 00:02 00:01 00:01 00:01 00:04 00:06 00:02 00:04 00:03 00:01 00:01 00:05 0.6 6.7 10.2 3.4 2.8 0.7 2.1 7.9 0.8 0.7 8.5 3.3 93.3 42.3 1.4 1.2 0.5 0.2 0.6 6.0 9.8 2.9 3.8 2.7 0.4 0.2 19.0 0.0 2.1 4.6 2.1 0.7 0.0 0.0 3.3 0.0 0.0 3.6 1.2 47.0 24.7 0.0 0.0 0.0 0.0 0.0 2.4 8.0 3.5 2.8 0.6 0.0 0.0 10.5 BP E'Iploration Milne Point. Alaska Page 2 of 4 · 0710712003 08:27 Milne Point Unit Monthly Gas Flaring Incident Report For: Jun 2003 Flare Name: Flare 1 Unplanned Events greater than 1 hour Duration =Volume (MSCF) = (hh:mm) Flare Assist Cause Start Time 06/02/200311:26:1 03:04 714.2 Comment 408.1 High water cut and slugging led to a high oil levels in the slugcatcher, resulting in a field wide shutdown. Oil levels were reduced in the oil separation trains. Gas compressors were purged for start up. Plant and field operations were brought on line and flaring ceased. BP Exploration Milne Point. Alaska Page 3 of 4 07107/2003 08:27 Milne Point Unit Monthly Gas Flaring Incident Report For: Jun 2003 . Flare Name: Flare 1 Planned Events less than or equal to 1 hour AND Volume Not Exceeding 5000 MCF Duration =Volume (MSCF) = (hh:mm) Flare Assist Cause Start Time Comment 06/29/200307:49:1 06/2912003 08:32:1 06/2912003 08:51:1 00:41 00:13 00:09 391.1 224.2 86.9 50.2 0.0 4.4 Flare Assist Unplanned Events <= 1 hour 542.8 305.3 Unplanned Events> 1 hour Planned Events <= 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF 714.2 408.1 702.2 54.7 0.0 0.0 Unmetered Assist Gas "q~1.7 TOTAL FLARED VOLUME 1,959.2 ID.10"ß MSCF BP Exp~ration Page 4 of 4 Milne Point. Alaska BPXA Planned Flaring Notification Subject: BPXA Planned Flaring Notification I, Date: Tue, 24 Jun 2003 13:04:13 -0500 ",,('ZÁt\,1C? From: "ACT, ENV Advisor" <ACTENVADVISOR@BP.com>'-<.Jì V To: "Jim Regg (E-mail)..<jimJegg@admin.state.ak.us> 0V cc: "Pfeiffer, Jim A" <PfeifDA@BP.com>, "MPU, Facilities Supervisor" <MPUFacilitiesSupervisor@BP.com>, "MPU, Facility Lead Tech" <MPUFacilityLeadTech@BP.com> Jim: I am sending you this note to provide the AOGCC with notification of a planned flaring event that will occur at the BP Exploration - Milne Point Production Facility. This planned flaring event will occur as part of a production facility maintenance slowdown scheduled for the month of July 2003. The actual dates during which the planned flaring will occur are July 9 - 10. During this time period, production will be reduced to minimize the volume of gas that must be flared. If you have any questions regarding this flaring event, please feel free to call me at (907) 670-3382. Ron Youngs Koreen Burrow / Ron Youngs ACT! Environmental Advisors Phone: 907-670-3382 (MPU) 907-659-6592 (End) Fax: 907-670-3175 1 of 1 6/24/2003 10:56 AM [Fwd: Planned Flaring - MPU Production Facility] Subject: [Fwd: Planned Flaring - MPU Production Facility] Date: Thu, 12 Jun 200308:44:02 -0800 From: Jim Regg <jim_regg@admin.state.ak.us> Organization: AOGCC To: Steve McMains <steve _ mcmains@admin.state.ak.us> Do you keep copies of notes like this? Jim Subject: Planned Flaring - MPU Production Facility Date: Wed, 11 Jun 2003 12:16:42 -0500 From: "ACT, ENV Advisor" <ACTENVADVISOR@BP.com> To: Jim Regg <jimJegg@admin.state.ak.us>, Tom Maunder <tom_maunder@admin.state.ak.us> CC: "MPU, Facility Lead Tech" <MPUFacilityLeadTech@BP.com>, "Pfeiffer, Jim A" <PfeiffJA@BP.com> Jim / Tom, The MilMPoiatUnit<MPU) Productronfaciltty is planning to perform some vibration testing on one of the main compressors in the facility. This will entail shutting down the compressor and will likely to lead to flaring. The flaring event is not expected to last more than 30 minutes; the volume flared should not exceed 500 MSCF. In an attempt to minimize the flaring event, crews will be mobilized on site, ready to begin collecting data as soon as feasible. Additionally, operations personnel are ready to shutdown IWAG systems as needed and an MPU E-pad well has been capped to provided gas flow to preclude a turbine shutdown. The work is expected to take place today. The purpose of this email was just to provide a courtesy notification of the planned flaring event. Please feel free to contact our office with any questions regarding this information. Regards, Koreen Koreen Burrow / Ron Youngs ACTI Environmental Advisors Phone: 907-670-3382 Fax: 907-670-3175 lof2 6/12/20039:18 AM ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Milne Point Field(s) Milne Point Disposition Volume MCF* 1. Sold Fuel 13,245 2. Reinjected 482,390 3. Flared or vented less than 1 hour 1,278 4. Flared or vented ç¡reater than 1 hour <' ,\i ~ 6,378 ,/ (Supplemental report required--See 20 AAC 25.235) 5. Pilot and Purç¡e 372 6. Used for lease operations Fuel 203,290 Assist 11141 7. Other TOTAL items 1-7 718,094 8. NGL ç¡as equivalent produced 9. Purchased ç¡as 10. Transferred from: PBU CGF (NGLS) 0 11. Transferred to: Remarks: Reinjected volume does not include PBU NGLS used to make MI. that the oregoing is true and correct to the best of my knowledge. Date Title m<>I'L-- TJOc'>c Signature Form 10-422 Rev. 4/95 Month/Year of Disposition Jul-03 *Indicate contribution of each pool to total. Pool Name lJoae Percent KUPARUK 525100 59.2 1::;l;H. t:SLUt-t- 4V.Ö SAG RIVER 525150 0.0 IUuNU V.V 1 . Safety 0¡37ß MCF~.e- 2. Lease MCF 3. Conserv. Purposes MCF í7Ø'~~. v' Commissioner Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. '0810512003 11 :00 Milne Point Unit Monthly Gas Flaring Incident Report For: Ju12003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration =Volume (MSCF) = (hh:mm) Flare Assist Cause Start Time Comment 07/0112003 14:59:f 07/02/200304:29:1 07/021200304:37:1 07/02/200304:58:1 07/02/200305:28:1 07/02/200307:59:1 07/0212003 10:59:1 07/0212003 11:13:1 07/02/2003 11:44:1 07/0212003 11:59:1 07/0212003 12:48:1 07/02/200314:14:1 - 07/02/200321:34:1 07/021200321:58:1 07/021200323:27:1 <' 07/0212003 23:59:1 07/031200307:48:1 07/03/200309:33:1 07/03/2003 11:39:1 07/0312003 12:24:1 07/0312003 15:24:1 07/03/2003 17:12:( 07/03/2003 17:24:1 07/0312003 17:43:1 07/0312003 17:54:1 07/03/2003 18:09:1 07/03/2003 18:25:1 07/0312003 18:50:1 07/0312003 19:08:( 07/04/200300:03:1 07/04/200300:19:1 07/04/200300:42:1 07/04/200300:56:1 07/04/200301: 11:1 07/04/200301:49:1 07/04/2003 02:07:1 07/0412003 05: 10:1 07/04/200305:38:1 07/041200305:58:1 07/041200306:58:1 07/041200307:44:1 00:01 00:01 00:08 00:02 00:02 00:01 00:01 00:02 00:01 00:01 00:12 00:01 00:11 00:02 00:03 00:01 00:12 00:12 00:36 00:06 00:06 00:03 00:06 00:02 00:06 00:06 00:20 00:10 00:07 00:12 00:11 00:03 00:04 00:34 00:11 00:08 00:05 00:07 00:02 00:02 00:01 0.6 0.6 7.2 1.3 1.7 0.4 2.0 3.7 0.3 0.1 6.6 0.4 5.3 0.9 1.7 0.3 124.5 5.2 73.1 7.8 2.2 1.2 5.1 0.6 1.6 2.0 36.0 7.0 2.2 41.2 8.4 2.5 3.1 24.8 4.7 4.1 5.2 10.1 4.6 0.7 0.2 0.0 0.0 2.8 0.2 0.2 0.0 0.4 1.3 0.0 0.0 2.2 0.0 0.0 0.0/ 0.0 0.0 6.1 0.0 0.8 0.0 0.0 0.0 0.011 0.0,\ o.ol[ I, 0.0 'I 0.0 t 0.0 \ 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 '7 ~ - . (;¥<:\ f/ .~\ I" \^-^ ef~ .cl~ " k~.A·JV DQt1v~ r1\Ã" ~ -\V~ ¡'" _ (lAY' .Ii r' \,r ll\1Y :\, cvx" (r~ ~ . '"1'W U J¥,l:71,; ~µ.t!/"'v . .~\Y ~ . . c rel~t4~ ~'- C,\ \, \~ß.,'V r-; ¿\\þ< 6) BP Exploration Milne Point. Alaskr, Page I of6 ·08105/2003 11:00 Milne Point Unit Monthly Gas Flaring Incident Report For: Jul2003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration =Volume(MSCF) = Start Time (hh:mm) Flare Assist Cause Comment 07/04/200308:29:1 00:01 0.7 0.0 07/051200302:56:1 00:04 1.4 0.0 07/051200303:12:1 00:03 2.2 0.0 07/051200303:59:1 00:01 0.3 0.0 07/05/200304:42:1 00:03 0.9 0.0 07/051200305:42:1 00:03 0.8 0.0 07/05/2oo305:55: 00:05 2.1 0.0 07/051200306:07:1 00:08 4.6 0.0 07/05/200306:23:( 00:07 3.0 0.0 07/05/2003 06:44:1 00:01 0.3 0.0 07/05/200309:25:( 00:05 2.0 0.0 07/051200309:37:1 00:08 4.0 0.0 07/0512003 11:18:( 00:12 14.7 0.0 07/0512003 11:38:1 00:07 12.6 0.0 07/05/2003 18:57:( 00:03 13.5 0.0 07/05/2003 19:05:( 00:10 30.0 0.0 07/05/200319:17:1 00:13 36.0 0.0 07/05/2003 19:39:1 00:06 10.8 4.9 07/06/200300:50:1 00:10 18.5 15.5 07/06/200301: 13:1 00:02 1.1 1.5 07/06/2oo301:29:f 00:01 0.1 0.0 07/06/200304:43:1 00:02 0.6 0.0 07/06/200309:43:1 00:02 0.9 0.1 07/071200302:56:1 00:04 9.7 3.7 07/07/200303:11:1 00:04 8.6 6.7 07/07/200307:05:1 00:10 4.4 0.5 07/07/2003 07: 17:f 00:13 5.3 1.2 07/07/200307:35:1 00:10 4.2 1.2 07/07/2003 11: 11 :1 00:04 1.6 0.0 07/07/2003 16: 14:1 00:01 0.3 0.0 07/07/2003 16:44:( 00:01 0.4 0.0 07/07/200322:44:( 00:01 0.5 0.0 07/07/200323:29:1 00:01 0.5 0.0 07/08/200300:29:1 00:01 0.3 0.0 07/08/200300:59:1 00:01 0.4 0.0 07/08/200301:28:1 00:02 0.5 0.0 07/08/200305:41 :1 00:04 18.4 7.7 07/08/200305:57:1 00:03 1.8 0.8 07/08/2oo307:28:f 00:02 0.9 0.0 07/08/2003 11:14:( 00:01 0.2 0.0 07/08/2003 15:29:( 00:01 0.2 0.0 BP Exploration Page 2 of 6 Milne Point, Alaska -08/05/2003 11:00 Milne Point Unit Monthly Gas Flaring Incident Report For: Ju12003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration =Volume (MSCF) = Start Time (hh:mm) Flare Assist Cause Comment 07/08/2003 15:59:1 00:01 0.5 0.0 07/0812003 16:29:1 00:01 0.1 0.0 07/08/200321:29:( 00:01 0.1 0.0 07/081200323:59:1 00:01 0.2 0.0 07/09/200302:43:1 00:02 0.7 0.0 07/091200309:29:1 00:01 0.5 0.0 07/09/200314:12:1 00:03 1.7 0.0 07/0912003 14:42:1 00:03 1.9 0.1 07/0912003 15:59:1 00:01 0.7 0.0 07/09/200316:14:1 00:01 0.9 0.0 07/09/2003 18:44:1 00:01 0.1 0.0 07/09/2003 20: 10:1 00:05 2.6 0.4 07/09/2003 20:29:1 00:01 0.7 0.5 07/09/200320:44:1 00:01 0.2 0.0 07/10/200304:13:1 00:02 0.6 0.0 07/11/2003 10:59:1 00:01 0.3 0.0 07/12/2003 13:29:1 00:01 0.4 0.0 07/14/2003 16:59:1 00:01 0.7 0.0 07/15/200307:44:1 00:01 0.3 0.0 07/19/2003 10:28:1 00:02 0.3 0.0 07/19/2003 1O:38:t 00:07 4.1 2.1 07/19/2003 10:56:1 00:04 3.8 3.4 07/19/2003 13:27:1 00:03 4.5 3.8 07/1912003 13:57:1 00:03 1.4 0.8 07/19/200314:13:1 00:02 2.7 2.3 07/19/2003 15:43:1 00:02 0.5 0.0 07/19/2003 16:43:( 00:02 1.2 0.6 07119/200321:58:1 00:02 0.4 0.0 07/19/200322:40:1 00:05 2.4 1.6 07/20/200303:37:( 00:08 18.4 12.8 07/20/200303:53:1 00:07 7.4 7.9 0712012003 19:23:1 00:07 21.6 9.2 07/20/2003 19:41:1 00:04 4.4 1.9 07/20/2003 21 :56:1 00:04 7.5 1.7 07/20/200322:13:1 00:02 2.6 1.7 07121/200317:07:1 00:08 65.0 10.3 07/21/2003 20:02:1 00:43 417.6 140.3 07/21/200320:56:1 00:04 38.8 16.8 07122/200301:26:1 00:04 6.2 2.2 07/26/2003 12:56:1 00:04 1.7 0.0 07/27/200300:14:1 00:01 0.4 0.0 BP ExplQration Page 3 of 6 Milne Point. Alaska " 08105/2003 11:00 Milne Point Unit Monthly Gas Flaring Incident Report For: Jul2003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration =Volume (MSCF) = (hh:mm) Flare Assist Cause Start Time Comment 07/29/2oo322:59:f 07/31/200320:55:1 00:01 00:05 0.5 20.6 0.0 7.3 BP Exploration Page 4 of 6 Milne Point. Alaska -0810512003 11 :00 Milne Point Unit Monthly Gas Flaring Incident Report For: Ju12003 Flare Name: Flare 1 Unplanned Events greater than 1 hour Duration =Volume (MSCF) = Start Time (hh:mm) Flare Assist Cause Comment 07/02/2003 20:03:1 01:27 378.0 11.4 An unexpected power interruption Production was minimized for the caused a closure of the facility maintenance slowdown period prior to auto-isolation valve and a series of the unexpected upset. Maintenance alarms that eventually caused water teams were dispatched to immediately injection to go down and triggered a to re-start compressor 5511A. flare event. 07/031200304:15:1 03:30 1,941.7 352.7 A radiator glycol leak in compressor Maintenance teams were dispatched to 5511 A caused moisture build-up in the immediately to re-start compressor motor, leading to a shutdown of the 5511A. The automation team had to compressor. An immediate start of the release the safety shutdown from the direct water injection system power failure and re-set the system unexpectedly caused a turbine failure, allowing for power and compressor field-wide shutdown and flaring. restart. 07/031200308: 12:1 01:18 332.6 2.6 A radiator glycol leak in compressor Maintenance teams were dispatched to 5511A caused moisture build-up in the immediately to re-start compressor motor, leading to a shutdown of the 5511A. The automation team had to compressor. An immediate start of the release the safety shutdown from the direct water injection system power failure and re-set the system unexpectedly caused a turbine failure, allowing for power and compressor field-wide shutdown and flaring. restart. 07/03/2003 12:42:1 02:33 50.9 0.0 A radiator glycol leak in compressor Maintenance teams were dispatched to 55 11 A caused moisture build-up in the immediately to re-start compressor motor, leading to a shutdown of the 5511A. The automation team had to compressor. An immediate start of the release the safety shutdown from the direct water injection system power failure and re-set the system unexpectedly caused a turbine failure, allowing for power and compressor field-wide shutdown and flaring. restart. 07/03/2003 19:23:1 04:37 1,233.4 0.0 A radiator glycol leak in compressor Maintenance teams were dispatched to 5511A caused moisture build-up in the immediately to re-start compressor motor, leading to a shutdown of the 5511A. The automation team had to compressor. An immediate start of the release the safety shutdown from the direct water injection system power failure and re-set the system unexpectedly caused a turbine failure, allowing for power and compressor field-wide shutdown and flaring. restart. 07/09/200321:54:1 02:06 933.1 192.2 Gas lift compressor 5511A was shut Maintenance and operations personnel down for planned maintenance activity. were redirected to compressor start up. Compressor 551lB had just been A bad vibration switch and logic panel returned to service from a maintenance problems with the compressor was shutdown. An unexpected high finally resolved and the compressor was discharge spike forced B compressor off put back into service. line, leading to unexpected flaring. BP Exploration Page 5 of6 Milne Poinl. Alaska .08105/2003 11:00 Milne Point Unit Monthly Gas Flaring Incident Report For: JuI 2003 Flare Name: Flare 1 Unplanned Events greater than 1 hour Duration =Volume (MSCF) = (hh:mm) Flare Assist Cause Start Time Comment 07/20/2003 16:59:1 02:16 1,507.9 396.0 Gas compressors shutdown due to high ambient temperatures (74 degrees F). The facility's process cooling system was unable to operate properly at that temperature. All available operators and maintenance personnel were dispatched to the plant to restart compressors, bleed of liquid levels from equipment, and to install temporary cooling systems. Flare Assist Unplanned Events <= 1 hour 1,277.8 285.5 Unplanned Events> 1 hour Planned Events <= 1 hour and not exceeding 5,000 MCF 6,377.7 954.8 0.0 0.0 Planned Events> 1 hour or exceeding 5,000 MCF 0.0 0.0 Unmetered Assist Gas 10.2.73,1 TOTAL FLARED VOLUME 7,655.5 II, Sf~.J.t MSCF BP Exploration Page 6 of 6 Milne Point. Alaska MPU Planned Flare Event - 6/29103 Subject: MPU Planned Flare Event - 6/29/03 Date: Sat, 28 Jun 2003 23:36:49 -0500 From: "ACT, ENV Advisor" <ACTENVADVISOR@BP.com> To: Jim Regg <jimJegg@admin.state.ak.us> CC: "Pfeiffer, Jim A" <PfeifÐA@BP.com>, "Coutts, Jack" <Jack_Coutts@dec.state.ak.us>, "MPU, Facility Lead Tech" <MPUFacilityLeadTech@BP.com>, "MPU, Facilities Supervisor" <MPUFacilitiesSupervisor@BP.com> Jim, The purpose of this email is to notify you of a planned flaring event at the Milne Point Production Facility. Operations and maintenance crews at the facility plan to perform a flare back pressure test prior to an upcoming major slowdown at the facility. The slowdown is scheduled to begin on J'uly2, 2003. The purpose of the test is to ensure that we do not have significant back pressure from the flare that may cause safety and operational concerns, especially during the slowdown. We expect the event to last less than one hour. It is scheduled to commence on 6/29/03 around 0730. Please feel free to contact our office with any questions. Regards, Koreen Burrow Koreen Burrow / Ron Youngs ACTI Environmental Advisors Phone: 907-670-3382 Fax: 907-670-3175 I of I 6/30/20033:15 PM ". ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Milne Point Operator BP Exploration (Alaska) Inc. Field(s) Milne Point Disposition Volume MCF* *Indicate contribution of each pool to total. 1. Sold Fuel 17,695 2. Reinjected 684,068 3. Flared or vented less than 1 hour 1,592 4. Flared or vented ç¡reater than 1 hour 0 (Supplemental report required--See 20 AAC 25.235) 5. Pilot and Purç¡e 372 6. Used for lease operations Fuel 265,606 Assist 10 698 7. Other TOTAL items 1-7 980,031 8. NGL ç¡as equivalent produced 9. Purchased ç¡as 10. Transferred from: PBU CGF (NGLS) 0 11. Transferred to: 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Remarks: Reinjected volume does not include PBU NGLS used to make MI. Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Signature Title ntúlL ,Þr-'x'" Date q /17../0") Form 10-422 Rev. 4/95 , 09/09/2003 09:31 Milne Point Unit Monthly Gas Flaring Incident Report For: Aug 2003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration =Volume (MSCF) = Start Time (hh:mm) Flare Assist Cause Comment 08/01/200302:43:1 00:02 0.7 0.0 08/01/200304:29:1 00:46 171.6 81.8 08/011200305: 17:( 00:13 53.3 28.5 08/021200300:03:1 00:12 4.7 0.3 08/02/200300:23:1 00:07 3.0 0.7 08/0212003 00:42:1 00:03 0.9 0.0 08/0212003 00:58:1 00:02 1.3 0.0 08/0212003 03:34:1 00:11 5.2 0.9 08/02/2003 03:57:1 00:03 1.6 0.8 08/03/2003 00:46:1 00:14 70.1 28.4 08/03/2003 01:0 I :1 00:44 170.3 82.8 08/03/200301:55:1 00:05 18.5 10.4 08/0312003 10:52:( 00:08 13.2 5.9 08/0412003 0 I: 14:1 00:01 0.6 0.0 08/04/2003 22:29:1 00:01 0.2 0.0 08/0612003 21: 13:1 00:02 0.2 0.0 08/08/2003 10:58:1 00:02 2.8 0.5 08/08/2003 11: II :1 00:04 22.8 11.6 08/10/2003 22:58:1 00:02 0.5 0.0 08/l4/2oo3 0 1:22:1 00:53 235.6 110.6 08/14/200302:18:1 00:42 136.9 63.5 08/14/200303:04:1 00:11 32.1 16.9 08/l4/2oo303:23:1 00:07 33.2 12.2 08/l4I2oo303:36:1 00:09 33.8 17.8 08/14/200303:52:1 00:08 32.0 16.3 08114/200304:07:1 00:08 29.3 12.2 08/14/200304:22:1 00:08 27.4 14.2 08/1412003 04:39:1 00:06 19.4 9.9 08/l4/2oo304:53:( 00:07 33.6 15.7 08/141200305:04:1 00:11 23.3 11.8 08/1412003 05: 21 :1 00:09 32.5 15.0 08/14/200305:36:1 00:09 29.4 13.4 08/14/200305:56:1 00:04 21.2 10.1 081141200306:07:( 00:08 20.9 9.3 08/141200306:18:1 00:12 24.8 10.5 08/141200306:40:1 00:05 18.4 10.9 0811412003 19:13:1 00:02 1.0 0.0 08/14/2003 19:58:1 00:02 1.0 0.0 081151200302:42:1 00:03 3.2 0.9 08/15/200305: 13:1 00:02 1.6 0.1 08/1512003 19:08:1 00:07 3.5 0.5 BP Exploration Page I of2 Milne Point. Alaska 09/09/2003 09:31 S Milne Point Unit Monthly Gas Flaring Incident Report For: Aug 2003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration =Volume (MSCF) = Start Time (hh:mm) Flare Assist Cause 08/16/2003 14:41:1 00:04 2.8 0.7 08116/2003 15: 10:1 00:05 4.3 1.5 08/17/200302:42:\ 00:03 1.8 0.2 08121/2003 19:41:1 00:04 12.8 2.6 08/21/2003 19:59:1 00:01 1.6 4.0 08/21/200320:42:1 00:03 2.2 0.4 08121/2003 20:58:1 00:02 0.6 0.0 08/22/200308:29:1 00:01 0.6 0.0 08/2212003 08:42:1 00:03 10.8 5.1 08/2212003 13:58:\ 00:02 1.7 0.2 08/2212003 16:43:1 00:02 1.5 0.0 08/24/2003 17:43:1 00:32 132.9 107.6 08124/2003 18:28:1 00:02 2.6 3.8 0812512003 07:28:1 00:17 14.1 12.8 08125/200307:52:1 00:08 6.3 6.9 08/26/200304:12:1 00:03 4.7 1.6 08/26/200304:29:1 00:01 1.2 1.1 08/26/2003 15:29:1 00:01 0.4 0.0 08/27/200308:59:1 00:01 0.4 0.0 08/2812003 16:35:1 00:10 27.2 12.2 08/28/2003 16:57:1 00:03 1.3 1.2 08/28/2003 17:51:1 00:09 19.9 9.3 08/28/2003 18: 10:1 00:05 4.1 1.8 Comment Flare Assist Unplanned Events <= 1 hour 1,591.5 797.5 Unplanned Events> 1 hour Planned Events <= 1 hour and not exceeding 5,000 MCF 0.0 0.0 0.0 0.0 Planned Events> 1 hour or exceeding 5,000 MCF 0.0 0.0 Unmetered Assist Gas (0,213. \ TOTAL FLARED VOLUME 1,591.5 11,070,(, MSCF BP Exploration Page 2 of 2 Milne Point, Alaska " ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Milne Point Inc. Field(s) Milne Point Disposition Volume MCF* 1. Sold Fuel 17,605 2. Reinjected 658,274 3. Flared or vented less than 1 hour 660 4. Flared or vented ç¡reater than 1 hour 0 (Supplemental report required--See 20 AAC 25.235) 5. Pilot and Purç¡e 360 6. Used for lease operations Fuel 264,175 Assist 9895 7. Other TOTAL items 1-7 950,969 8. NGL ç¡as equivalent produced 9. Purchased ç¡as 10. Transferred from: PBU CGF (NGLS) 0 11. Transferred to: Remarks: I hereby ce;tï)Y that t e foregoing is true and correct to the best of my ~OWledge. Signature L/( . Title IVU') fL /ItX Date 16(cttó3 Form 1 0-422 Rev. 4/95 *Indicate contribution of each pool to total. o e Percent 525100 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. 1010612003 09:47 Milne Point Unit Monthly Gas Flaring Incident Report For: Sep 2003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration =Volume (MSCF) = (hh:mm) Flare Assist Cause Start Time Comment 09/011200315:12:1 0910212003 10: 14:1 09/03/200308:57:1 09/03/2003 09: 10:1 09/03/2003 09:20:1 09/03/2oo309:37:t 09/03/2003 10:26:1 09/03/2003 II :03:1 09/0312003 11 :26:4 09/03/2003 11 :41:1 09/03/2003 12: 10:1 09/03/2003 12: 19:1 09/0312003 12:39:1 09/03/2003 13:43:( 09/04/2003 10:44:1 09/05/200309:43:1 09/06/2003 15:44:1 09/06/2003 16:44:1 09/07/200308:14:1 09/171200320:13:1 09/1912003 10:43:1 09119/2003 10:55:1 09/2212003 22: 14:1 09/2212003 22:43:1 09128/2003 10: 11:1 09/28/2003 13:28:1 09/2812003 13:56:1 0912812003 14:11:1 09/28/200314:18:1 09/2912003 13:46:1 09/2912003 14:12:1 00:03 00:01 00:03 00:05 00:10 00:08 00:04 00:12 00:04 00:04 00:05 00:11 00:06 00:02 00:01 00:02 00:46 00:01 00:01 00:02 00:02 00:05 00:16 00:02 00:04 00:17 00:04 00:04 00:12 00:14 00:03 0.8 0.5 0.9 2.2 12.9 8.2 4.8 18.5 2.5 9.4 9.3 15.9 3.8 1.0 0.3 0.4 352.3 2.8 0.3 1.0 4.2 25.0 80.2 2.6 3.3 38.9 11.0 6.3 16.4 21.6 1.9 0.0 0.0 0.0 0.6 5.3 4.1 1.8 8.1 0.6 4.9 3.5 7.6 2.4 0.0 0.0 0.0 174.5 3.2 0.0 0.0 0.5 13.4 35.1 1.8 0.9 16.9 7.1 2.6 7.5 9.8 0.8 BP Exploration Page lof2 Milne Point. Alask, 1010612003 09:47 Milne Point Unit Monthly Gas Flaring Incident Report For: Sep 2003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration =Volume (MSCF) = (hh:mm) Flare Assist Cause Start Time Comment 09/30/2003 11 :29:1 00:0 I 0.5 0.0 Flare Assist Unplanned Events <= 1 hour 659.6 313.0 Unplanned Events> 1 hour Planned Events <= 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF 0.0 0.0 0.0 0.0 0.0 0.0 ~q~ .7 Unmetered Assist Gas TOTAL FLARED VOLUME 659.6 lO2.S4.7 MSCF. BP Exploration Page 2 of 2 Milne Point. Alaska ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Milne Point Disposition Operator BP Exploration (Alaska) Inc. Volume MCF* 1. Sold Fuel 18,627 2. Reinjected 707,483 3. Flared or vented less than 1 hour 1,699 4. Flared or vented greater than 1 hour 0 (Supplemental report required--See 20 AAC 25.235) 5. Pilot and Purge 373 6. Used for lease operations Assist 10,960 Fuel 283 494 7. Other TOTAL items 1-7 1,022,636 8. NGL gas equivalent produced 0 9. Purchased gas 10. Transferred from: 11. Transferred to: Signature Title YJlt6 (L., ""fA:X Date Form 1 0-422 Rev. 4/95 Month/Year of Disposition Oct-03 *Indicate contribution of each pool to total. Pool Name LioC1e Percent Kuparuk 525100 41.21% Shrader 525140 55.85% Sag River 525150 2.94% Ugnu 525160 0.00% 1 . Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. J 110712003 08:30 Milne Point Unit Monthly Gas Flaring Incident Report For: Oct 2003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration =Volume (MSCF) = Start Time (hh:mm) Flare Assist Cause Comment 10/02/200303:58:1 00:02 0.3 0.0 10/0312003 0 1:29:1 00:01 0.1 0.0 10/04/2003 21 :29:1 00:01 0.2 0.0 10/0612003 02:59:1 00:01 0.4 0.0 10/06/2003 10:09:1 00:06 6.6 4.1 10/06/2003 11:06:1 00:09 9.8 6.6 10/0612003 12:11:( 00:04 1.9 0.6 10/06/2003 12:43:1 00:02 0.6 0.0 10/06/2003 12:46:1 00:14 17.4 12.7 10/06/2003 13:39:1 00:06 13.5 8.7 10/06/2003 13:54:~ 00:06 3.9 2.9 10/06/2003 14:08:1 00:07 8.4 5.7 10/06/200314:21:1 00:09 10.2 7.1 10/0612003 14:35:1 00:10 15.5 9.9 10/06/2003 14:55:1 00:05 6.8 5.7 10/0612003 15:24:1 00:06 12.1 7.3 10/0612003 15:36:1 00:09 9.5 8.2 10/06/2003 15:49:1 00:11 12.9 9.3 10/06/2003 16: 16:( 00:14 17.8 11.3 10/06/2003 16:40:1 00:05 7.6 7.0 10/0612003 16:57:~ 00:03 2.6 1.4 10/0612003 17:23:1 00:07 18.4 12.0 10/0612003 17:35:~ 00:10 6.0 5.1 10/06/2003 17 :51 :t 00:09 4.8 3.0 10/0612003 18:07:1 00:08 6.6 4.5 10/06/2003 18: 18:1 00:12 20.8 15.9 10/061200318:58:1 00:17 16.6 11.1 10/06/2003 19:22:1 00:08 10.5 8.4 10/0612003 20: 12:1 00:03 4.2 0.9 10/06/200320:23:1 00:07 15.7 13.4 10/06/2003 20:44:( 00:01 0.2 0.0 10/06/200320:53:( 00:22 24.0 17.0 10/06/2003 21 :22:1 00:08 6.1 4.8 10/06/200321:54:1 00:06 12.0 7.5 - < 10/06/2003 22:06:1 00:09. 5.7 4.2 10/06/200322:24:1 00:06 8.0 4.5 10/06/2003 22:38:1 00:07 8.4 7.2 10/06/2003 22:53:1 00:07 9.5 6.7 10/06/200323:05:1 00:10 9.8 6.8 10/06/2003 23:43:t 00:02 0.9 0.0 10/061200323:50:1 00:10 13.4 9.3 BP Exploration Page I of5 Milne Point. Alaska 1110712003 08:30 Milne Point Unit Monthly Gas Flaring Incident Report For: Oct 2003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration =Volume (MSCF) = Start Time (hh:mm) Flare Assist Cause Comment 10/07/200300:04:1 00:11 14.8 11.6 10/07/200300:27:1 00:03 3.5 1.1 10107/200300:36:1 00:09 9.6 6.7 10107/200300:46:1 00:14 22.9 17.8 10/07/200301:09:1 00:06 6.7 4.7 10/07/200301:20:1 00:10 9.6 7.2 10/07/200301:34:1 00:11 14.0 8.9 10/07/200301:46:1 00:14 22.9 18.5 10/07/200302:05:' 00:10 9.2 6.5 10/07/2oo302:19:t 00:26 20.4 14.0 10/071200302:50:1 00:10 17.3 13.5 10107/2oo303:1O:t 00:05 6.9 4.1 101071200303:22:1 00:08 13.1 9.9 10/071200303:36:1 00:09 15.8 11.4 10/071200304: 10:1 00:05 3.4 1.6 10/07/200304:26:« 00:19 32.9 23.8 10/071200304:53;1 00:07 5.1 4.3 10/071200305:04;1 00:41 42.2 31.0 10/071200305:58:1 00:02 0.8 0.6 10107/200306:05:1 00:10 14.2 8.7 10/07/200306:21:1 00:09 14.0 11.5 10/07/200306:31:1 00:14 11.7 8.2 10/071200306:54:1 00:06 4.1 2.7 10/071200307:03:1 00:12 12.6 8.2 10/071200307: 17:1 00:13 20.4 15.5 10/07/200307:38:1 00:07 5.2 3.8 10/07/200307:46:1 00:14 17.4 12.9 10/07/2oo308:06:t 00:24 30.9 22.8 10/07/200308:34:1 00:11 6.6 4.5 10/07/200308:49:1 00:11 7.9 5.1 10/07/200309:04:1 00:11 21.9 17.0 10107/200309:20:1 00:10 13.7 9.6 10/071200309:33:( 00:42 53.3 39.4 10/0712003 10:22:1 00:08 7.1 5.5 10/07/2003 10:37:1 00:08 10.0 6.8 - < 10/0712003 10:58:1 00:02 0.9 0.7 10/07/2003 11 :02:' 00:13 13.3 9.2 10/071200311:21:1 00:09 11.9 8.9 10/0712003 11:36:1 00:09 8.7 6.0 1010712003 11 :52:1 00:08 2.0 0.4 10/07/2oo312:14:t 00:01 0.1 0.0 BP Exploration Page 2 of 5 Milne Point, AlaskD 1110712003 08:30 Milne Point Unit Monthly Gas Flaring Incident Report For: Oct 2003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration =Volume (MSCF) = Start Time (hh:mm) Flare Assist Cause Comment 10/0712003 12:24:t 00:06 6.8 4.6 10/07/2003 12:40:1 00:05 6.1 3.6 10/07/2003 12:48:1 00:12 12.3 8.7 10/07/2003 13:09:1 00:06 4.5 3.9 10/07/2003 13:22:( 00:08 12.6 8.9 10/07/2003 13:39:t 00:06 7.2 4.9 10/07/200313:57:1 00:03 2.1 1.0 10/0712003 14:09:1 00:06 4.9 3.0 10/07/200314:16:1 00:14 10.1 7.2 10/0712003 14:35:1 00:25 18.7 13.4 10/0712003 15:11:1 00:04 3.1 2.8 10/07/2003 15:38:1 00:07 9.7 6.6 10/0712003 15:54:1 00:06 5.8 3.1 10/0712003 16:03:1 00:12 11.0 8.9 10/0712003 16:25:1 00:05 8.1 5.4 10/0712003 16:42:1 00:03 0.6 0.1 10/0712003 16:53:1 00:07 8.3 5.5 10/0712003 17: 11:1 00:04 3.8 2.5 10/07/2003 17:23:1 00:07 6.3 4.1 10/08/2003 20:06:1 00:09 5.3 2.8 10/081200320:27:1 00:03 1.9 1.8 10/08/200321:41:1 00:04 2.1 0.8 10/0812003 21 :59:1 00:01 0.5 0.5 10/0812003 22:09:1 00:06 8.5 5.1 10/0812003 22:29:1 00:01 0.7 1.2 10/09/2003 00:06:1 00:09 3.0 1.5 10/09/2003 00:21:1 00:09 5.0 3.1 10/09/200300:42:( 00:03 0.5 0.0 10/0912003 01:06:1 00:09 7.9 5.3 10/09/2003 04:09:1 00:06 5.5 3.5 10/091200305:23:1 00:07 3.4 1.6 1O/<}9l2oo305:41:1 00:04 4.3 3.5 10/09/200306:12:1 00:03 2.6 0.8 10/09/200306:25:1 00:05 5.3 4.4 10/0912003 06:54:1 00:06 3.7 1.9 10/09/200307:08:1 00:07 3.1 2.2 10/09/2003 08:39:1 00:06 9.0 6.1 10/0912003 09:54:1 00:06 3.2 1.4 10/09/2003 10:27:1 00:03 3.1 1.3 1O/~l2oo3 10:38:1 00:07 7.1 5.7 10/<fl2oo3 12:38:t 00:07 4.0 2.4 ~ration Page 3 of5 . . Milne Point. Alaska 11/0712003 08:30 Milne Point Unit Monthly Gas Flaring Incident Report For: Oct 2003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration =Volume (MSCF) = Start Time (hh:mm) Flare Assist Cause Comment 10/0912003 12:55:1 00:05 5.6 3.7 10/09/2003 18:09:( 00:06 3.4 1.5 10/09/2003 18:23:1 00:07 9.8 6.9 10/09/2003 18:40:1 00:05 1.5 0.4 10/09/2003 20:09:1 00:06 4.0 2.2 10/091200320:24:1 00:06 2.7 2.1 10/101200317:57:1 00:03 1.0 0.0 10/101200318:14:1 00:01 0.1 0.0 10/10/2003 18:23:1 00:07 10.8 7.6 10/1012003 18:39:1 00:06 1.8 0.6 10/10/2003 20:04:1 00:11 7.5 4.4 10/1012003 20:25:1 00:05 3.1 2.5 10/10/2003 22:54:1 00:06 11.3 7.9 10/10/200323:17:1 00:13 22.7 4.8 10/1112003 02:20:1 00:10 6.8 2.8 10/11/2003 02:58:( 00:02 0.5 0.0 10/111200303:29:1 00:01 0.3 0.0 10/1112003 03:41:1 00:04 2.3 0.1 10/11/2003 03:52:( 00:08 5.2 2.0 1011112003 06:39:1 00:06 7.4 3.0 10/11/2003 06:52:1 00:08 5.3 2.2 10/111200307:32:1 00:13 11.0 4.4 10/1112003 08:08:1 00:07 9.3 4.1 10/11/2003 13:09:1 00:06 3.0 0.2 10/1112003 15:32:1 00:13 13.7 5.8 10/1112003 16:09:1 00:06 10.8 4.6 10/11/2003 16:56:( 00:04 1.8 0.0 10114/200305:27:1 00:03 0.8 0.0 10/14/200305:42:1 00:03 2.5 0.9 10/15/2003 12:23:1 00:07 31.9 13.1 10121/200317:58:1 00:32 210.3 92.9 10121/2003 18:32:1 00:13 57.6 30.1 10/2212003 10:44:1 00:01 0.4 0.0 10/23/2003 10: 13:1 00:02 0.3 0.0 -' 10/24/200308:14:1 00:01 0.6 0.0 10/24/200314:13:1 00:02 1.7 0.2 1012412003 18:51:1 00:39 74.8 36.7 10/24/2003 19:38:( 00:07 3.9 1.9 10/2512003 14:59:1 00:01 0.2 0.0 101261200316:14:1 00:01 0.2 0.0 1012712003 11 :28:1 00:02 0.2 0.0 BP Exploration Page 4 of 5 Milne Point. Alaska 11107/2003 08:30 Milne Point Unit Monthly Gas Flaring Incident Report For: Oct 2003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration =Volume(MSCF) = (hh:mm) Flare Assist Cause Start Time Comment 10/28/200308:43:1 10/3112003 08:44:1 00:02 00:01 0.3 0.4 0.0 0.0 Flare Assist Unplanned Events <= 1 hour 1,699.3 1,059.9 Unplanned Events> 1 hour Planned Events <= 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF 0.0 0.0 0.0 0.0 0.0 0.0 10 213. I , Unmetered Assist Gas TOTAL FLARED VOLUME 1,699.3 \ \ \ 3 3 ~ . 0 MSCF BP Exploration Page 5 of 5 Milne Poinl. Ala.' ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Milne Point Field(s) Milne Point Operator BP Exploration (Alaska) Inc. Disposition Volume MCF* 1. Sold Fuel 18,451 2. Reinjected 679,379 3. Flared or vented less than 1 hour 237 4. Flared or vented greater than 1 hour 1,497 (Supplemental report required--See 20 AAC 25.235) 5. Pilot and Purge 360 6. Used for lease operations Assist 10,558 Fuel 277 602 7. Other TOTAL items 1-7 988,084 8. NGL gas equivalent produced 0 9. Purchased gas 10. Transferred from: 11. Transferred to: Signature Title M.ú (L \P\x Date l-z..{t l'f/O} Form 1 0-422 Rev. 4/95 Month/Year of Disposition Nov-03 *Indicate contribution of each pool to total. Pool Name '-'Ode Percent Kuparuk 525100 42.07% Schrader 525140 55.22% Sag River 525150 2.71% Ugnu 525160 0.01% 1. Safety -f,13,a- 4q7 MCF 2. Lease MCF 3. Conserv. Purposes MCF Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ·12/0812003 10:38 Milne Point Unit Monthly Gas Flaring Incident Report For: Nov 2003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration =Volume (MSCF) = (hh:mm) Flare Assist Cause Start Time Comment 11/0212003 13:14:1 11/03/2003 10:29:1 11/041200307:13:1 11/06/200301:44:1 11/0612003 16:59:1 11/10/2003 10:59:1 11/1212oo301:21:t 11/1412003 13:25:1 11/14/2003 13:43:1 11/1512003 19:07:t 11/191200303: 14:t 111191200303:29:1 11121/200302:57:1 11121/2oo303:09:t 11121/200321:12:1 11123/2oo321:43:t 11125/2003 02:44:t 11/25/2003 19: 13:« 1112612003 09:25:j 1112612003 09:34:1 111261200311:37:( 1112612003 12:54:1 11126/200320: 14:1 11126/2003 22:44:1 11/2812003 19:14:1 11128/200323:07:1 11/29/200320:14:1 11/30/200305:55:1 11/30/2003 06: 10:1 11/30/2003 16:59:1 00:01 00:01 00:02 00:01 00:01 00:01 00:09 00:05 00:02 00:08 00:01 00:01 00:03 00:06 00:03 00:02 00:01 00:02 00:05 00:11 00:08 00:06 00:01 00:01 00:01 00:08 00:01 00:05 00:05 00:01 0.6 0.4 0.3 0.1 0.4 6.1 60.3 32.2 1.0 21.5 0.5 0.4 27.1 19.6 1.1 0.5 0.7 0.9 3.2 4.4 17.7 9.9 0.5 0.4 0.5 14.4 0.4 4.1 6.8 0.6 0.0 0.0 0.0 0.0 0.0 2.3 16.4 11.0 0.0 23.1 0.0 0.1 2.8 16.2 0.0 0.0 0.0 0.0 0.8 0.0 10.0 4.3 0.0 0.0 0.0 6.6 0.0 1.3 2.8 0.0 BP Exploration Page lof2 Milne Point. Alaska .1210812003 10:38 Milne Point Unit Monthly Gas Flaring Incident Report For: Nov 2003 Flare Name: Flare 1 Unplanned Events greater than 1 hour Duration =Volume (MSCF) = (hh:mm) Flare Assist Cause Start Time Comment 11/26/2003 10:04:1 01 :26 163.7 118.4 A gas leak developed on the 1st stage The gas lift wells were shut in to reduce discharge cylinder on the B gas lift the amount of gas being flared during compressor. Had to shut down the B the repair. compressor to repair the leak. 681.4 PLC units failed causing IW AG All B-pad gas lift wells wer shut in at compressors to shutdown leading to a the choke. C-pad wells were shut in complete C-pad and C5502B with the pad shutdown. Flare was compressor outage. monitored and assist gas increased to prevent an opacity excursion. Maintenance repaired the faulty units and returned system to normal. 78.9 The Big A gas lift compressor was Thirty high gas-oil ratio (GOR) wells shutdown to repair a leaking valve cover were shut in to minimize the amount of on a cylinder discharge valve. gas flared during the valve cover repair work. 11/10/200309:40:1 01:05 613.0 11/1512003 16:00:1 03:00 720.7 Unplanned Events> 1 hour Planned Events <= 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF 878.7 , )\..L-. \ 5t;1'\L ( (Oi;~ .1 J. wt. I. _ .J-~ U- Jö¡µA; ~~ ,lC' A ,,°0 '" ~ \&.r Flare Assist Unplanned Events <= 1 hour 236.5 r;,~ ~:0 97.8 __- ---- ".,,,,,--~ 0.0 0.0 0.0 0.0 Unmetered Assist Gas ~qLiI,7 TOTAL FLARED VOLUME 1,733.9 \0918.2 MSCF ,BP Exploration Page 2 of 2 Milne Point, Alaska '. ~. ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Milne Point Operator BP Exploration (Alaska) Inc. Field(s) Milne Point Disposition Volume MCF* 1. Sold Fuel 17,673 2. Reinjected 605,159 3. Flared or vented less than 1 hour 4,106 4. Flared or vented greater than 1 hour 2,766 V (Supplemental report requlred--See 20 AAC 25.235) 5. Pilot and Purge 372 6. Used for lease operations Assist 12,695 Fuel 268 262 7. Other TOTAL items 1-7 911,033 8. NGL gas equivalent produced 0 9. Purchased gas 10. Transferred from: 11. Transferred to: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature Title fVL Cs rl...- 1" kJ( Date Form 10-422 Rev. 4/95 Month/Year of Disposition Dec-03 *Indicate contribution of each pool to total. Pool Name l,;ode Percent Kuparuk 525100 46.45% Schrader 525140 51.87% Sag River 525150 1.66% Ugnu 525160 0.02% 1. Safety Z{ '1bÇ:, MCF .6'{!¡L 2. Lease MCF 3. Conserv. Purposes MCF Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. O1107nOO4 08:43 Milne Point Unit Monthly Gas Flaring Incident Report For: Dec 2003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration = Volume (MSCF) = Start Time (hh:mm) Flare Assist Cause Comment 12/011200302:14:1 00:01 1.4 0.9 12101/200311:12:( 00:03 0.7 0.0 12/0112003 16:39:1 00:06 8.6 1.9 12/061200304:28:1 00:02 1.4 0.4 12/06/200304:50:1 00:10 20.3 5.2 12/061200307:42:1 00:03 1.0 0.0 12/06/2003 10:29:1 00:01 0.7 0.0 12/06/200310:44:1 00:01 0.1 0.0 12/06/2003 10:57:1 00:03 5.5 1.0 12/06/2003 11 :29:1 00:01 1.0 0.0 12/09/200308:17:1 00:43 74.0 72.6 12/09/200309:02:1 00:43 70.7 70.1 12/091200309:46:1 00:29 51.1 51.4 1210912003 10:24:1 00:06 10.1 10.5 12/09/2003 10:36:1 00:09 8.6 7.6 12109/2003 10:53:1 00:07 7.3 6.1 12/09/200311:10:1 00:05 7.4 8.0 12/09/2003 11 :22:( 00:08 10.9 10.2 12/09/2003 11 :37:1 00:08 9.5 8.2 12/09/2003 11:54:1 00:06 6.9 6.2 12/09/2003 12:09:1 00:06 9.3 9.7 12/09/2003 12:22:1 00:08 9.5 8.8 12/09/2003 12:38:1 00:07 9.9 8.2 12/09/2003 12:54:1 00:06 6.2 6.8 12/091200313:12:1 00:03 4.9 4.7 12/09/2003 13:57:1 00:03 1.3 0.7 12/11/2003 10:56:( 00:04 2.6 1.9 12/111200311:14:1 00:01 0.2 0.0 12/11/2003 11:28:1 00:02 0.7 0.3 12/11/2003 11:59:1 00:01 0.1 0.0 12/1112003 13:43:1 00:02 2.1 0.6 12/1112003 13:52:1 00:08 10.5 11.3 12/11/200314:13:1 00:02 1.3 0.7 12/11/200315:12:1 00:03 1.3 0.4 12/11/2003 15:28:1 00:02 1.4 1.6 12/11/200321:40:( 00:05 26.4 24.3 12/1212003 04:34:1 00:11 12.1 11.5 12/14/200301:23:1 00:07 16.2 13.6 12/14/200301:42:1 00:03 3.9 5.5 12/141200301 :54:t 00:06 5.8 5.2 12/14/200307:13:( 00:02 1.8 0.7 BP Exploration Page I of6 Milne Point. Alaska 01/0712004 08:43 Milne Point Unit Monthly Gas Flaring Incident Report For: Dec 2003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration =Volume(MSCF) = Start Time (hh:mm) Flare Assist Cause Comment 121141200307:24:1 00:06 6.2 5.7 12114/200307:43:1 00:02 2.5 2.9 12/2412003 10:02:1 00:58 324.7 62.0 12124/2003 15:49:1 00:11 9.3 3.5 12/2412003 16: 15:1 00:30 21.5 6.5 12/24/2003 16:58:1 00:02 0.8 0.0 1212412003 17:20:1 00:10 5.0 0.5 12/241200320:46:1 00:14 17.1 5.8 12/241200321:14:1 00:01 0.5 0.0 12/24/200321:41:1 00:04 4.9 0.8 12/241200321:54:1 00:06 6.9 3.3 12124/2003 22: 10:1 00:05 3.1 0.6 12/25/2003 00: 17:1 00:13 46.5 16.4 12/25/2oo300:43:t 00:02 6.5 4.2 12125/200300:48:1 00:12 31.2 10.4 12/25/200301:02:1 00:13 40.6 16.8 12125/2003 0 I : 18:1 00:12 31.6 12.8 12/25/200301:41:1 00:04 14.5 5.5 12/25I2oo301:51:t 00:24 65.4 29.9 12125/200302:21:1 00:09 30.5 15.5 12/25/2oo302:41:t 00:04 5.7 2.5 12/25/200304:43:( 00:02 4.4 0.1 12/25/200304:53:1 00:07 35.3 18.8 12/25/2oo305:49:t 00:41 102.5 49.9 12/251200306:32:1 00:13 28.8 19.8 12125/200306:48:1 00:27 55.5 50.5 12125/200307:18:1 00:12 27.3 21.9 12/251200307:34:1 00:11 24.6 19.1 12/2512003 07:46:1 00:14 29.3 23.9 12/251200308:05:1 00:10 20.3 15.9 121251200308:21:( 00:09 17.1 13.1 12125/200308:32:1 00:13 22.9 17.3 12/25/2003 08:55:1 00:05 10.2 8.4 12125/2003 09:24:1 00:06 5.9 3.8 12/2512003 09:41:1 00:04 12.7 9.7 12/251200309:49:1 00:11 18.9 13.7 12/2512003 10:02:1 00:13 17.3 13.9 12/2512003 10:28:1 00:02 3.5 3.4 12/2512003 1O:42:t 00:03 5.8 2.4 1212512003 10:51:( 00:09 25.2 19.7 12/2512003 11:0 I :1 00:29 38.3 31.4 BP Exploration Page 2 of 6 Milne Point. Alaska 01107/2004 08:43 Milne Point Unit Monthly Gas Flaririg Incident Report For: Dee 2003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration =Volume (MSCF) = Start Time (hh:mm) Flare Assist Cause Comment 12/25/2003 11:33:1 00:12 21.6 16.1 12/25/2003 II :49:1 00:11 20.5 16.3 12125/2003 12:07:1 00:08 17.4 13.5 12/251200312:21:1 00:09 25.2 19.0 12/2512003 12:35:1 00:10 21.7 18.2 12/2512003 12:49:1 00:11 22.0 17.7 12/25/2003 13:07:1 00:08 18.6 14.5 1212512003 13:20:1 00:10 25.8 19.3 12/25/2003 13:37:1 00:08 21.7 16.8 12/2512003 13:50:1 00:10 20.4 16.7 12/2512003 14:13:1 00:02 1.7 0.4 12/25/200314:19:1 00:11 30.8 24.1 12/2512003 14:32:1 00:13 16.9 13.8 12/25/2003 14:50:( 00:10 32.2 24.4 12/25/2003 15:06:1 00:09 17.0 13.3 12/2512003 15:17:. 00:13 29.3 22.3 12/25/2003 15:41:1 00:04 16.6 9.4 12/25/2003 15:54:1 00:06 23.9 21.6 12/25/2003 16:05:1 00:10 20.0 16.8 12/2512003 16:27:1 00:03 12.5 9.8 12/25/2003 16:42:t 00:03 9.4 5.7 12/2512003 16:52:1 00:08 17.5 13.6 12/2512003 17:08:1 00:07 12.8 11.1 1212512003 17 :21 :« 00:09 23.4 18.1 12/25/200317:34:1 00:11 25.1 19.0 12125/2003 17:52:1 00:08 12.2 9.1 12/25/2003 18:05:1 00:10 21.1 15.6 12/25/2003 18:22:1 00:08 16.4 13.5 12/25/2003 18:33:1 00:12 13.6 10.7 12/25/2003 18:50:1 00:10 11.4 9.5 12/2512003 19:02:1 00:13 21.4 16.2 12125/200319:18:1 00:12 20.9 15.8 12/25/2003 19:38:1 00:07 12.7 11.0 12/2512003 19:52:1 00:08 21.8 16.9 121251200320:05:1 00:10 18.9 14.7 12/25/200320:23:1 00:07 10.8 8.1 12/25/2003 20:39:1 00:06 9.7 6.4 12/2512003 20:51:1 00:09 24.3 19.3 12/251200321 :08:1 00:07 20.5 16.6 12/251200321:22:1 00:08 19.1 14.8 12/25/200321:33:( 00:12 23.3 17.9 BP Exploration Page 3 of6 Milne Point. Alaska 01/07/2004 08:43 Milne Point Unit Monthly Gas Flaring Incident Report For: Dee 2003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration =Volume (MSCF) = Start Time (hh:mm) Flare Assist Cause Comment 12/25/200321:47:1 00:13 18.4 14.2 12/251200322:05:1 00:10 16.7 12.8 12/251200322:24:1 00:06 13.5 10.0 12/2512003 22:33:( 00:12 20.2 17.1 12/25/200322:56:1 00:04 6.5 5.0 12/25/2oo323:08:t 00:22 35.4 26.5 12/25/200323:35:( 00:10 13.4 11.5 12/2512003 23:51:1 00:09 21.3 16.6 12/261200300:08:1 00:07 10.8 8.3 12/261200301:59:1 00:01 0.0 0.0 12/261200302:05:1 00:10 26.1 20.3 12/26/200302:57:1 00:03 3.6 2.2 12/26/2003 03: 13:1 00:47 112.1 87.9 12/261200304:08:1 00:07 29.2 24.5 12/26/200306:27:1 00:03 2.1 1.0 12/26/200308:29:1 00:01 0.4 0.0 12126/200309:23:1 00:07 9.4 6.8 12/26/2003 16:24:1 00:06 3.3 1.8 12/26/200316:41:1 00:04 2.1 1.3 12/28/2oo305:04:t 00:26 64.6 50.4 12/28/200305:33:1 00:27 97.2 76.8 12/281200306:07:1 00:53 127.7 24.9 12/28/2003 07:0 I :1 00:44 79.7 14.6 12/281200307:47:1 00:43 65.9 11.2 12/28/200308:33:1 00:12 8.6 0.6 12/28/200308:47:1 00:13 15.6 2.5 12/28/200309:04:1 00:11 9.5 0.7 12/28/200309:27:1 00:03 0.9 0.0 12128/200309:52:1 00:38 35.4 3.7 12/28/2003 11:24:1 00:06 9.7 1.2 12/28/2003 22: l1:t 00:04 2.1 0.0 12/281200322:57:1 00:03 2.0 0.0 12/29/2003 02: 11:1 00:04 4.5 0.0 12/29/200303:38:1 00:07 8.5 0.9 12/29/200303:56:« 00:04 3.3 0.0 12/29/200304:22:1 00:23 95.2 17.8 12/29/200304:46:1 00:14 37.3 7.8 12/29/200305:02:1 00:28 97.1 19.1 12129/200305:34:1 00:11 42.9 8.2 12/29/200305:46:1 00:14 22.8 4.0 1212912003 06:08:1 00:07 14.7 2.3 BP Exploration Page 4 of 6 Milne Point. Alaska 0110712004 08:43 Milne Point Unit Monthly Gas Flaring Incident Report For: Dec 2003 Flare Name: Flare 1 Unplanned Events less than or equal to 1 hour Duration =Volume (MSCF) = Start Time (hh:mm) Flare Assist Cause 12/2912003 06: 17:1 00:13 11.3 1.5 12/29/2oo306:43:f 00:02 1.3 0.0 12/29/200306:58:1 00:02 0.4 0.0 12/2912003 07: 10:1 00:05 6.8 0.6 12/29/200307:21:1 00:09 7.7 0.7 12/29I2oo307:37:t 00:08 3.5 0.0 12/29/200307:55:1 00:05 7.3 0.9 12/29I2oo308:11:f 00:04 4.3 0.1 12/29/2oo308:20:t 00:10 10.7 1.1 12/29/2003 08:40:1 00:05 10.8 1.7 12/291200308:47:1 00:43 398.5 138.4 12/291200309:34:1 00:11 66.6 34.8 Comment BP Exploration Page 5 of 6 Milne Point. Alaska 01/07/2004 08:43 Milne Point Unit Monthly Gas Flaring Incident Report For: Dee 2003 Flare Name: Flare 1 Unplanned Events greater than 1 hour Duration =Volume(MSCF) = Start Time (hh:mm) Flare Assist Cause Comment 12/01/200300:38:1 01:22 420.2 154.7 A well head transmitter at C pad froze Maintenance personnel were called out up resulting in a false indication of low to investigate the upset. The transmitter pressure. This false low pressure was repaired thus allowing operations to indication resulted in the automatic safely restart the wells and equipment. shutdown of the wells, line heaters, and IW AG compressor. 12/06/2003 00:05:1 04:10 1,554.7 296.7 Turbine PU-0801 malfunctioned and A replacement turbine was installed. shutdown. As a result, the facility's gas The facility's operations and plant, water flood operation, and several maintenance departments will be well pads where shut down. The flaring working with the turbine manufacturer occurred as the shut down equipment to determine the root cause of the safely depressurized and again during malfunction. the subsequent restart. 12/2412003 11 :02:t 01:43 426.9 52.8 The "A" Gas Compressor was shutdown Thirty one high gas producing wells to investigate the cause of some were shut in to minimize the amount of knocking it was experiencing. flaring during the event. After Compressor was restarted when compressor restart, a Compressor Maintenance Dept. verified the Analysis Specialist was brought on-site knocking did not pose imminent danger for further evaluation. Subsequent of equipment failure. repairs were completed. 12124/200312:46:1 02:59 363.7 48.3 Continuation of event that started at Continuation of event that started at 11:02 11:02 Flare Assist Unplanned Events <= 1 hour 4,106.7 2,241.3 Unplanned Events> 1 hour Planned Events <= 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF 2,765.6 552.5 0.0 0.0 0.0 0.0 Unmetered Assist Gas IO,l13.1 TOTAL FLARED VOLUME 6,872.3 1310('~.C¡ MSCF BP Exploration Page 6 of 6 Milne Point. Alaska