Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutPBU CCP-FFGU / BP Exploration
STATE OF ALASKA
AOGCC
GAS DISPOSITION FILES
YEAR: 2003
FACILITY: PBU CCP/FFGU
OPERATOR: BP EXPLORATION
(ALASKA) IN C
I Facility
CENTRAL COMPRESSOR PLANT
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
I Operator I Field(s)
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU
I Month/Year of Disposition
01/2003
Disposition
Volume MCF"
"Indicate contribution of each pool to total.
3. Flared or vented less than 1 hour.
2,453
Pool Name Code Percent
PRUDHOE 640150 99.75%
PBU Midnight Sun Undefined 640158 0.25%
1. Sold
3,501,870
2. Reinjected
223,903,820
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
o
5. Pilot and Purge
33,180
6. Used for lease operations
Fuel
Assist
6,212,032
o
7. Other
Lift Gas, Off Field
o
TOTAL items 1 - 7
233,653,355
1. Safety
MCF
8. NGL gas equivalent produced
o
2. Lease Use
MCF
9. Purchased gas
o
3. Conserv. Purposes
MCF
10. Transferred from: FS1, FS2, FS3, GC1, GC2, GC3
250,851,946
Commissioner
Date
11. Transferred to: CGF
20,460,411
Remarks:
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
I hereby cert~ that t'}f foregoing~s true and correct to the best of my knowledge.
Signature: 'I.. O.l0u~ Title: SUPERVISOR
Form 10-422 (Revised 4/95)
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
January 2003
Page 1
IUnplanned Events less than or equal to 1 hour
1/29/2003
1/29/2003
1/29/2003
1/29/2003
1/29/2003
1010-1020
1340-1350
1356-1406
1440-1450
1655-1705
408 Not required for unplanned events which
408 are less than or equal to 1 hour
408
109
408
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
1,741
IUnplanned Events greater than 1 hour
See attachments
See attachments
TOTAL
o
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Met
1/3/2003
1/4/2003
1/18/2003
2143-2148
0215-0220
0020-0025
408 See attachments
152
152
See attachments
TOTAL
712
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Met
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
See attachments
See attachments
TOTAL
o
1,741
o
712
o
TOTAL FLARED VOLUME
35,633
217/2003
9:31 AM
bp
REPORT NO: 03-0004
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP
DATE: 03 Jan 2003
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
OHrs OMins 0 0 0 o MSCF
21:43 21:48 OHrs 5Mins 0 0 ~ 408 MSCF
TOTAL VOLUME 408 MSCF
First Determination of Cause:
1. Shut down tic 1878 for maint.
Action Taken to Stop Flaring:
1. Depressured unit
Monday, January 20,2003
Page 1 of 1
FACILITY: CCP
SYSTEM
1. Flare/Relief Valve
REPORT NO: 03-0005
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 04 Jan 2003
TIME OF FLARING
Start Stop Duration
02:15 02:20 0 Hrs 5Mins
First Determination of Cause:
1. Vented tic 1878 to zero after spin cool
Action Taken to Stop Flaring:
1. Depressured unit
Monday, January 20, 2003
Black
Intermittent Smoke
o 0
Planned
TOTAL VOLUME
~
VOLUME
152 MSCF
152 MSCF
Page 1 of 1
FACILITY: CCP
SYSTEM
1. Flare/Relief Valve
REPORT NO: 03-0044
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 18 Jan 2003
TIME OF FLARING
Start Stop Duration
00:20 00:25 OHrs 5Mins
First Determination of Cause:
1. Pressure test for start up of T /C 1878
Action Taken to Stop Flaring:
1. Pressure test complete
Wednesday, January 29, 2003
Black
Intermittent Smoke
o 0
Planned
TOTAL VOLUME
~
VOLUME
152 MSCF
152 MSCF
Page 1 of 1
IFacility
CENTRAL COMPRESSOR PLANT
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
I Operator Field(S)
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU
Month/Year of Disposition
02/2003
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
1. Sold
3. Flared or vented less than 1 hour.
276
Pool Name Code Percent
PRUDHOE 640150 99.75%
PBU Midnight Sun Undefined 640158 0.25%
2,922,481
2. Reinjected
211,262,386
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
o
5. Pilot and Purge
30,220
6. Used for lease operations
Fuel
Assist
5,563,421
o
7. Other
Lift Gas, Off Field
o
TOTAL items 1 . 7
219,778,784
1. Safety
MCF
8. NGL gas equivalent produced
o
2. Lease Use
MCF
9. Purchased gas
o
3. Conserv. Purposes
MCF
10. Transferred from: FS 1, FS2, FS3, GC1, GC2, GC3
235,638,195
Commissioner
Date
11. Transferred to: CGF
18,995,335
I hereby cerpty that
Signature: l¿ ..Q-
Form 10-422 (Revised 4/95)
is true and correct to the best of my knowledge.
Title: SUPERVISOR
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
Remarks:
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT· CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
February 2003
Page 1
IUnplanned Events less than or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
o
IUnplanned Events greater than 1 hour
See attachments
See attachments
TOTAL
o
Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Met
2/21/2003
2/22/2003
2120-2125
1220-1225
135 See attachments
141
See attachments
TOTAL
276
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Met
See attachments
See attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
o
276
o
TOTAL FLARED VOLUME
30,496
3/10/2003
4:29 PM
FACILITY: CCP
SYSTEM
1. Flare/Relief Valve
REPORT NO: 03-0098
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 21 Feb 2003
TIME OF FLARING
Start Stop Duration
21 :20 21 :25 0 Hrs 5 Mins
First Determination of Cause:
1. SID 1802 for maintenance
Action Taken to Stop Flaring:
1. Unit depressured
Monday, February 24, 2003
Black
Intermittent Smoke
o 0
Planned
TOTAL VOLUME
~
VOLUME
135 MSCF
135 MSCF
Page 1 of 1
FACILITY: CCP
SYSTEM
1. Flare/Relief Valve
REPORT NO: 03-0099
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 22 Feb 2003
TIME OF FLARING
Start Stop Duration
12:20 12:25 OHrs 5Mins
Black
Intermittent Smoke
o 0
TOTAL VOLUME
First Determination of Cause:
1. depressured T /C 1802 with ESD switch after spin cool
Action Taken to Stop Flaring:
1. system depressured
Monday, February 24, 2003
Planned
~
VOLUME
141 MSCF
141 MSCF
Page 1 of 1
IFacility
CENTRAL COMPRESSOR PLANT
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
operator I Field(s)
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU
Month/Year of Disposition
03/2003
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
3. Flared or vented less than 1 hour.
o
Pool Name Code Percent
PRUDHOE 640150 99.75%
PBU Midnight Sun Undefined 640158 0.25%
1. Sold
3,776,739
2. Reinjected
231,026,807
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 MC 25.235)
o
5. Pilot and Purge
32,580
6. Used for lease operations
Fuel
Assist
6,185,758
o
7. Other
Lift Gas, Off Field
o
TOTAL items 1 -7
241,021,884
1. Safety
MCF
8. NGL gas equivalent produced
o
2. Lease Use
MCF
9. Purchased gas
,
o
3. Conserv. Purposes
MCF
10. Transferred from: FS1, FS2, FS3, GC1, GC2, GC3
258,862,804
Commissioner
Date
11. Transferred to: CGF
20,380,223
Remarks:
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
I hereby cert~ that tne fOregOinrt true and correct to the best of my knowledge.
Signature: k'.O. II ÁA~ Title: SUPERVISOR
Form 10-422 (Revised 4/95)
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT· CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
Mareh 2003
Page 1
1..~~P~:~~;d.:~~~t:I::~ .t.~~~··..~~¥~1~~;~~~:~~~fi!m!º""'ºI5;!f!!ºI[)Bt1I:l:ª"º~º~§T ......·...........···.·.·~º.[!ºt1I[~~¡:¡¡f!!.Tº;E;lÄIftI!~IE;.º~º~¡:¡¡.t.··...·.·.········
Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
TOTAL
o
IUnplanned Events greater than 1 hour
>.DATE < rIME. < .. ...' > ...VQLtJMEDE$Q:IIPT:!()NQfINCI[)!õ"'Tª,ÇA.t,I$~ ....... ........ .··..·Aør.º~fr~ENT()ELlI1IIIAA:rE¢~tJ$t:.···
See attachments See attachments
TOTAL
o
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Met
....!>þ.T¡:¡¡.. .·..t··..··.··..··...TIME;;..·..···....¥()¡¡,uME;.ºE;~ºJ;¡!fi!mI(),.".ºI5.I,.,,º!PE;t1IT.~º~º~E;. ..t·.·..···..i.~º[!()J¡m~~¡:¡¡f!!.T()TE;LlftI!~IE;.~~!l!Sl:·············
See attachments See attachments
TOTAL
o
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Met
....... .DATE<>TIME.><·..VOLUftle.[)E$ç¡;¡!PTI()N()f!N(:IDE~T&ÇAUSE".'>(AÇ""9!'iI~K!:ttTqE;UM!~TEºAU$E<"'" ....
See attachments See attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
o
o
o
t
o
32,580
4/8/2003
11:06 AM
I Facility
CENTRAL COMPRESSOR PLANT
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
operator I Field(s)
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU
Month/Year of Disposition
04/2003
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
1. Sold
3,684,956
Pool Name
Code
Percent
2. Reinjected
208,569,533
PRUDHOE
640150
99.75%
3. Flared or vented less than 1 hour.
3,829
PBU Midnight Sun Undefined
640158
0.25%
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
180
./
5. Pilot and Purge
32,247
6. Used for lease operations
Fuel
Assist
5,756,384
o
7. Other
Lift Gas, Off Field
o
TOTAL items 1 - 7
218,047,129
1. Safety
/30 MCF -.:rS,L
8. NGL gas equivalent produced
o
2. Lease Use
MCF
9. Purchased gas
o
3. Conserv. Purposes
MCF
10. Transferred from: FS 1, FS2, FS3, GC1, GC2, GC3
233,661,157
t!m';j!:Á "\
6/'I/ðJ
Date
11. Transferred to: CGF
18,349,335
Remarks:
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
I hereby ce')il{' that¡the foregoing is true and correct to the best of my knowledge.
Signature: k~(ll~ J...~ Title: SUPERVISOR
Form 10-422 (Revised 4/95)
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
April 2003
IUnplanned Events less than or equal to 1 hour
4/3/2003
4/4/2003
4/4/2003
4/4/2003
4/5/2003
4/5/2003
4/6/2003
4/6/2003
4/8/2003
4/8/2003
4/8/2003
4/8/2003
4/13/2003
0800-0802
0140-0145
2020-2025
2145-2150
0345-0350
0740-0745
1900-1905
2127-2210
0525-0530
0825-0830
0910-0915
1730-1735
1950-1952
TOTAL
8 Not required for unplanned events which
8 are less than or equal to 1 hour
156
159
141
14
159
312
109
408
109
109
8
1,700
IUnplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL
o
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Met
4/1/2003
4/1/2003
4/1/2003
4/1/2003
4/1/2003
4/1/2003
4/1/2003
4/2/2003
4/2/2003
4/2/2003
4/3/2003
4/3/2003
4/3/2003
4/4/2003
4/5/2003
4/6/2003
4/6/2003
4/7/2003
4/13/2003
0110-0115
0205-0207
0215-0217
0420-0422
0730-0732
0845-0847
1140-1145
0334-0339
1 030-1 035
1300-1 302
0725-0730
1230-1235
1730-1735
1900-1905
0245-0250
1240-1245
1550-1555
0140-0600
2050-2052
156 See attachments
45
45
45
45
45
135
45
141
14
135
14
32
141
32
156
35
560 Intermittent, 10 minutes
8
Page 1
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
5/7/2003
4:07 PM
4/13/2003
4/13/2003
4/14/2003
4/14/2003
4/15/2003
2200-2204
2335-2337
2230-2234
2250-2252
0040-0042
TOTAL
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
April 2003
Page 2
135
8
135
8
14
2,129
IPlanned Events Exceedin~ 1 Hour OR Exceedin~ 5000 Met
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
4/1/2003 2020-2345 180 See attachments
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
ACTION TAKEN TO EUMINATE CAUSE
See attachments
180
1,700
o
2,129
180
36,256
5/7/2003
4:07 PM
REPORT NO: 03-0160
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP DATE: 01 Apr 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 01:10 01:15 OHrs 5Mins ~ 0 ~ 156 MSCF
2. Flare/Relief Valve 02:05 02:07 OHrs 2 Mins ~ 0 ~ 45 MSCF
3. Flare/Relief Valve 02:15 02:17 OHrs 2Mins ~ 0 ~ 45 MSCF
4. Flare/Relief Valve 04:20 04:22 OHrs 2Mins ~ 0 ~ 45 MSCF
5. Flare/Relief Valve 07:30 07:32 OHrs 2Mins ~ 0 ~ 45 MSCF
6. Flare/Relief Valve 08:45 08:47 OHrs 2Mins ~ 0 ~ 45 MSCF
7. Flare/Relief Valve 11:40 11:45 OHrs 5Mins ~ 0 ~ 135 MSCF
8. Flare/Relief Valve 20:20 23:45 3Hrs 25 Mins ~ 0 ~ 180 MSCF
TOTAL VOLUME 696 MSCF
First Determination of Cause:
1. T /C 1810 SID for spring water wash.
2. T/C 1810 given a stop due to spin cool problem.
3. T/C 1810 given a stop due to spin cool problem.
4. T/C 1810 off spin cool.
5. T /C 1806 spin cooling.
6. T /C 1806 off spin cool.
7. T/C 1813 SID for spring water wash.
8. T /C 1807 SID for spring water wash.
Action Taken to Stop Flaring:
1. Unit depressured.
Wednesday, April 30, 2003
Page 1 of 2
FACILITY: CCP
).. ~ Unit given another start.
..3 K Unit given another start.
~ y£ Unit depressured.
ç £ Unit depressured.
b 14:' Unit depressured.
7 16 Unit depressured.
g 1ß:' Unit depressured.
Wednesday, April 30, 2003
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 01 Apr 2003
REPORT NO: 03-0160
Page 2 of 2
REPORT NO: 03-0164
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP DATE: 02 Apr 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 03:37 03:39 OHrs 2 Mins ~ 0 ~ 45 MSCF
2. Flare/Relief Valve 10:30 10:35 OHrs 5Mins 0 0 ~ 141 MSCF
3. Flare/Relief Valve 13:00 13:02 OHrs 2Mins 0 0 ~ 14 MSCF
TOTAL VOLUME 200 MSCF
First Determination of Cause:
1. T /C 1807 tripped low seal oil overhead tank lev.
2. T /C 1808 ESD for water wash
3. shut down for psv work
Action Taken to Stop Flaring:
1. Corrected level and restarted.
2. restarted for spin cool
3. conpleted psv work
Wednesday, April 30, 2003
Page 1 of 1
REPORT NO: 03-0169
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP DATE: 03 Apr 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 07:25 07:30 OHrs 5Mins 0 0 ~ 135 MSCF
2. Flare/Relief Valve 08:00 08:02 OHrs 2Mins 0 0 0 8 MSCF
3. Flare/Relief Valve 12:30 12:35 OHrs 5Mins 0 0 ~ 14 MSCF
4. Flare/Relief Valve 17:30 17:35 OHrs 5Mins 0 0 ~ 32 MSCF
TOTAL VOLUME 189 MSCF
First Determination of Cause:
1. normal stop for spin cool T /C 1803
2. T/C 1803 shut down on instrument problem
3. T /C 1803 shut down for water wash ( esd )
4. T /C 1810 stopped from water wash normal stop
Action Taken to Stop Flaring:
1. started spinning cooling
2. restarted spin cool
3. maintenance work
4. maintenance work
Wednesday, April 30, 2003
Page 1 of 1
REPORT NO: 03-0170
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP DATE: 04 Apr 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 01:40 01:45 OHrs 5 Mins 0 0 0 8 MSCF
2. Flare/Relief Valve 19:00 19:05 OHrs 5Mins 0 0 ~ 141 MSCF
3. Flare/Relief Valve 20:20 20:25 OHrs 5Mins 0 0 0 156 MSCF
4. Flare/Relief Valve 21:45 21:50 OHrs 5Mins 0 0 0 159 MSCF
TOTAL VOLUME 464 MSCF
First Determination of Cause:
1. Shut-Down T /e 1804 after spin Cool
2. Shut down T /C 1801 for waterwash
3. T/C 1810 shutdown during start up for mechanical problem
4. T /C 1811 shut down for water wash
Action Taken to Stop Flaring:
1. system depressured
2. gas train depressured
3. repaired and restarted turbine
4. gas train depressured
Wednesday, April 30, 2003
Page 1 of 1
REPORT NO: 03-0173
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP DATE: 05 Apr 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 02:45 02:50 OHrs 5Mins 0 0 ~ 32 MSCF
2. Flare/Relief Valve 03:45 03:50 OHrs 5Mins 0 0 0 141 MSCF
3. Flare/Relief Valve 07:40 07:45 OHrs 5Mins 0 0 0 14 MSCF
TOTAL VOLUME 187 MSCF
First Determination of Cause:
1. Shut Down T /C 1811 after Spin Cool
2. Shut Down T/C 1805 for water wash
3. 1805 Spin cool complete
Action Taken to Stop Flaring:
1. system depressured
2. gas train depressured
3. Depressured T /C
Wednesday, April 30, 2003
Page 1 of 1
REPORT NO: 03-0180
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP DATE: 06 Apr 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 12:40 12:45 OHrs 5Mins 0 0 ~ 156 MSCF
2. Flare/Relief Valve 15:50 15:55 OHrs 5 Mins 0 0 ~ 35 MSCF
3. Flare/Relief Valve 19:00 19:05 OHrs 5Mins 0 0 0 159 MSCF
4. Flare/Relief Valve 21:27 22:10 OHrs 43 Mins ~ 0 0 312 MSCF
TOTAL VOLUME 662 MSCF
First Determination of Cause:
1. T /C 1809 shut down for spin cool
2. T /C 1809 shut down from spin cooling
3. Shut Down T/C 1812 for Maint. Load test overhead crane
4. After start of T/C 1812 a fuse blew in the local control room panel resulting in a shut down of the
turbine
2nd trip of turbine occured after restart - same problem
Action Taken to Stop Flaring:
1. depressured system
2. Depreesured with ESD
3. Depressured gas train
4. gas train depressured, fixed problem and restarted unit
Wednesday, April 30, 2003
Page 1 of 1
FACILITY: CCP
SYSTEM
1. Flare/Relief Valve
REPORT NO: 03-0189
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 07 Apr 2003
TIME OF FLARING
Start Stop Duration
01 :40 06:00 Hrs 10 Mins
First Determination of Cause:
1. Shut down T /C 1876 for waterwash
2nd time Shut down after spin cool
Action Taken to Stop Flaring:
1. depressured gas train
Wednesday, April 30, 2003
Black
Intermittent Smoke
~ 0
Planned
TOTAL VOLUME
~
VOLUME
560 MSCF
560 MSCF
Page 1 of 1
REPORT NO: 03-0210
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP DATE: 13 Apr 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 19:50 19:52 OHrs 2Mins 0 0 0 8 MSCF
2. Flare/Relief Valve 20:50 20:52 OHrs 2Mins 0 0 ~ 8 MSCF
3. Flare/Relief Valve 22:00 22:04 OHrs 4Mins 0 0 ~ 135 MSCF
4. Flare/Relief Valve 23:35 23:37 OHrs 2Mins 0 0 ~ 8 MSCF
TOTAL VOLUME 159 MSCF
First Determination of Cause:
1. T /C 1813 tripped during Water Wash
2. T/C 1813 shutdown - Water Wash complete
3. T/C 1813 shutdown for maintenance - repair vib probe and misc leaks
4. T/C 1813 shutdown - spincool completed
Action Taken to Stop Flaring:
1. T/C 1813 depressured
2. T /C 1813 depressured
3. T/C 1813 depressured
4. T /C 1813 depressured
Wednesday, April 30, 2003
Page 1 of 1
REPORT NO: 03-0217
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP
DATE: 14 Apr 2003
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
22:30 22:34 OHrs 4Mins 0 0 ~ 135 MSCF
22:50 22:52 OHrs 2Mins 0 0 ~ 8 MSCF
TOTAL VOLUME 143 MSCF
First Determination of Cause:
1. T /C 1813 was shutdown to repair an oil leak
2. T/C 1813 tried to spincool turbine - wouldn't engage starting turbine
Action Taken to Stop Flaring:
1. T/C 1813 depressured
2. T/C 1813 depressured
Wednesday, April 30, 2003
Page 1 of 1
FACILITY: CCP
SYSTEM
1. Flare/Relief Valve
REPORT NO: 03-0216
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 15 Apr 2003
TIME OF FLARING
Start Stop Duration
00:40 00:42 0 Hrs 2 Mins
First Determination of Cause:
1. T /C 1813 shutdown - spincool completed
Action Taken to Stop Flaring:
1. T /C 1813 depressured
Wednesday, April 30, 2003
Black
Intermittent Smoke
o 0
Planned
TOTAL VOLUME
~
VOLUME
14 MSCF
14 MSCF
Page 1 of 1
IFacility
CENTRAL COMPRESSOR PLANT
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
operator I Field(s)
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU
I Month/Year of Disposition
OS/2003
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
1. Sold
3. Flared or vented less than 1 hour.
2,125
Pool Name Code Percent
PRUDHOE 640150 99.75%
PBU Midnight Sun Undefined 640158 0.25%
2,643,873
2. Reinjected
196,800,817
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
o
5. Pilot and Purge
33,129
6. Used for lease operations
Fuel
Assist
6,339,334
o
7. Other
Lift Gas, Off Field
o
TOTAL items 1 . 7
205,819,278
1. Safety
MCF
8. NGL gas equivalent produced
o
2. Lease Use
MCF
9. Purchased gas
o
3. Conserv. Purposes
MCF
10. Transferred from: FS1, FS2, FS3, GC1, GC2, GC3
221,067,400
Commissioner
Date
11. Transferred to: CGF
17,636,542
Remarks:
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
I hereby cert~that We foregoi g is true and correct to the best of my knowledge.
Signature: '-/.0. (l Title: SUPERVISOR
Form 10-422 (Revised 4/95)
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
May 2003
IUnplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
5/16/2003 1210-1215 135 Not required for unplanned events which
5/16/2003 1415-1420 135 are less than or equal to 1 hour
5/17/2003 1630-1635 135
5/19/2003 1615-1620 45
5/20/2003 2101-2102 683
5/22/2003 0400-0405 135
5/25/2003 0337-0342 135
5/27/2003 1010-1013 32
TOTAL
1 ,435
IUnplanned Events greater than 1 hour
DATE TIME VOLUME
DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL
o
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Met
DATE TIME VOLUME DESCRIPTION OF INCIDENT& CAUSE
5/15/2003 0930-0935 135
5/15/2003 1115-1117 14
5/16/2003 1705-1710 135
5/16/2003 2030-2032 51
5/17/2003 1805-1810 135
5/23/2003 0130-0135 32
5/23/2003 1320-1325 32
5/27/2003 0900-0905 156
TOTAL
690
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Met
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
TOTAL
1,435
o
690
o
35,254
Page 1
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTIONTAKEN·TO· ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
6/9/2003
11:25AM
REPORT NO: 03-0307
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP
DATE: 15 May 2003
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
09:30 09:35 o Hrs 5Mins 0 0 ~ 135 MSCF
11 :15 11 :17 OHrs 2Mins 0 0 ~ 14 MSCF
TOTAL VOLUME 149 MSCF
First Determination of Cause:
1. tic 1803 shut down to repair oil leak
2. tic 1803 shut down after spin cool
Action Taken to Stop Flaring:
1. depressured unit
2. depressured unit
Friday, May 23,2003
Page 1 of 1
REPORT NO: 03-0314
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP DATE: 16 May 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 12:10 12:15 OHrs 5Mins 0 0 0 135 MSCF
2. Flare/Relief Valve 14:15 14:20 OHrs 5Mins 0 0 0 135 MSCF
3. Flare/Relief Valve 17:05 17:10 OHrs 5Mins 0 0 ~ 135 MSCF
4. Flare/Relief Valve 20:30 20:32 OHrs 2Mins 0 0 ~ 51 MSCF
TOTAL VOLUME 456 MSCF
First Determination of Cause:
1. tic 1803 tripped on start up
2. tic 1803 tripped on restart
3. shut down tic 1803 coupling guard leak
4. shut down tic 1803 after spin cool to repair coupling guard
Action Taken to Stop Flaring:
1. depressured unit
2. depressured unit
3. depressured unit
4. depressured unit
Friday, May 23, 2003
Page 1 of 1
REPORT NO: 03-0320
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP
DATE: 17 May 2003
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
16:30 16:35 OHrs 5Mins 0 0 0 135 MSCF
18:05 18:10 OHrs 5Mins 0 0 ~ 135 MSCF
TOTAL VOLUME 270 MSCF
First Determination of Cause:
1. Shut down tic 1803 coupling guard leaking
2. A Normal stop from spin cool T /c 1803
Action Taken to Stop Flaring:
1. Depressured unit
2. Depressured unit
Friday, May 23, 2003
Page 1 of 1
REPORT NO: 03-0340
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP
DATE: 23 May 2003
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
01:30 01:35 OHrs 5Mins 0 0 ~ 32 MSCF
13:20 13:25 OHrs 5Mins 0 0 ~ 32 MSCF
TOTAL VOLUME 64 MSCF
First Determination of Cause:
1. Pressure testing T/C 1812. Found a gasket that was leaking.
2. Depressured tic 1812 after leak check
Action Taken to Stop Flaring:
1. Depressured T/C 1812
2. Depressured unit
Tuesday, May 27, 2003
Page 1 of 1
REPORT NO: 03-0347
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP
DATE: 27 May 2003
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
09:00 09:05 OHrs 5Mins 0 0 ~ 156 MSCF
10:10 10:13 OHrs 3Mins 0 0 0 32 MSCF
TOTAL VOLUME 188 MSCF
First Determination of Cause:
1. Shut down t'c 1812 to repair PSV 65 D.
2. tic 1812 tripped on start up. Flame failure
Action Taken to Stop Flaring:
1. Depressured unit
2. depressured unit
Sunday, June 01, 2003
Page 1 of 1
IFacility
CENTRAL COMPRESSOR PLANT
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
operator Field(S)
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU
IMonth/Year of Disposition
06/2003
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
1. Sold
3,631,742
3. Flared or vented less than 1 hour.
135
Pool Name Code Percent
PRUDHOE 640150 99.75%
PBU Midnight Sun Undefined 640158 0.25%
2. Reinjected
194,750,504
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
o
5. Pilot and Purge
32,167
6. Used for lease operations
Fuel
Assist
5,629,158
o
7. Other
Lift Gas, Off Field
o
TOTAL items 1 - 7
204,043,706
1. Safety
MCF
8. NGL gas equivalent produced
o
2. Lease Use
MCF
9. Purchased gas
o
3. Conserv. Purposes
MCF
10. Transferred from: FS1, FS2, FS3, GC1, GC2, GC3
218,102,184
Commissioner
Date
11. Transferred to: CGF
16,728,639
I hereby ce~ that th
Signature: ',¿. G.
Form 10-422 (Revised 4/95)
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
Remarks:
Title: SUPERVISOR
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
June 2003
IUnplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
6/18/2003 1515·1520 135 Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
135
IUnplanned Events greater than 1 hour
DATE TIME VOLUME
DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL
o
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAIJSE
TOTAL
o
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Met
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
TOTAL
135
o
o
o
32,302
Page 1
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKENTOELIMINA TECAUSE
See attachments
7/9/2003
2:05 PM
I Facility
CENTRAL COMPRESSOR PLANT
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
loperator I Field(s)
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU
I Month/Year of Disposition
07/2003
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
1. Sold
3,571,858
3. Flared or vented less than 1 hour.
1,800
Pool Name Code Percent
PRUDHOE 640150 99.75%
PBU Midnight Sun Undefined 640158 0.25%
2. Reinjected
188,940,065
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
o
5. Pilot and Purge
33,138
6. Used for lease operations
Fuel
Assist
5,462,774
o
7. Other
Lift Gas, Off Field
o
TOTAL items 1 - 7
198,009,635
1. Safety
MCF
8. NGL gas equivalent produced
o
2. Lease Use
MCF
9. Purchased gas
o
3. Conserv. Purposes
MCF
10. Transferred from: FS1, FS2, FS3, GC1, GC2, GC3
208,957,922
Commissioner
Date
11. Transferred to: CGF
13,498,367
I hereby cert~ that t
Signature: {I.G..
Form 10-422 (Revised 4/95)
is true and correct to the best of my knowledge.
Title: SUPERVISOR
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
Remarks:
Page 1
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT· CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
July 2003
IUnplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION'OFINCIDENT'&CAUSE
7/2/2003 0210-0215 135 Not required for unplanned events which
7/11/2003 1000-1010 420 are less than or equal to 1 hour
TOTAL
555
IUnplanned Events greater than 1 hour
DATE TIME VOLUME
TOTAL
DESCRIPTION OF INCIDENT & CAUSE
See attachments
o
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Met
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
7/1/2003 1145-1150 156
7/1/2003 2400-0005 135
7/2/2003 0740-0745 35
7/3/2003 1250-1255 141
7/8/2003 0815-0820 408
7/8/2003 0915-0920 109
7/8/2003 1020-1025 109
7/8/2003 1240-1245 152
TOTAL
1,245
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
o
TOTAL
555
o
1,245
o
34,938
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTIONTAKEN'TOELlMINATE.CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
8/11/2003
11:07AM
REPORT NO: 03-0407
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP
DATE: 01 Jul 2003
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
11:45 11:50 OHrs 5Mins 0 0 ~ 156 MSCF
24:00 00:05 OHrs 5Mins 0 0 ~ 135 MSCF
TOTAL VOLUME 291 MSCF
First Determination of Cause:
1: ShùlàoWh TIC 1'812 for maintenance
2. Shut down T /C 1808 for maintenance
Action Taken to Stop Flaring:
1. depressured unit
2. depressured unit
Monday, July 21,2003
Page 1 of 1
REPORT NO: 03-0409
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP
DATE: 02 Jul 2003
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
02:10 02:15 OHrs 5Mins 0 0 0 135 MSCF
07:40 07:45 OHrs 5Mins 0 0 ~ 35 MSCF
TOTAL VOLUME 170 MSCF
First Determination of Cause:
1. T /C 1805 tripped reason unknown
2. ESDed T/C 1812 from the local control room.
Action Taken to Stop Flaring:
1. Depressured unit
2. Depressured unit.
Monday, July 21, 2003
Page 1 of 1
FACILITY: CCP
SYSTEM
1. Flare/Relief Valve
REPORT NO: 03-0412
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 03 Jul 2003
TIME OF FLARING
Start Stop Duration
12:50 12:55 0 Hrs 5 Mins
First Determination of Cause:
1. ESDed T /C 1813 from the local control room.
Action Taken to Stop Flaring:
1. Depressured unit.
Monday, July 21, 2003
Black
Intermittent Smoke
o 0
Planned
~
TOTAL VOLUME
VOLUME
141 MSCF
141 MSCF
Page 1 of 1
bp
REPORT NO: 03-0419
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP DATE: 08 Jul 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 08:15 08:20 OHrs 5Mins 0 0 ~ 408 MSCF
2. Flare/Relief Valve 09:15 09:20 OHrs 5Mins 0 0 ~ 109 MSCF
3. Flare/Relief Valve 10:20 10:25 OHrs 5Mins 0 0 ~ 109 MSCF
4. Flare/Relief Valve 12:40 12:45 OHrs 5Mins 0 0 ~ 152 MSGF
TOTAL VOLUME 778 MSCF
First Determination of Cause:
1. Gave T /C 1878 a stop.
2. Pressured T/C 1878 up and then gave it a stop.
3. Pressured T/C 1878 up and then gave it a stop.
4. Pressured unit up and then gave it a ESD.
Action Taken to Stop Flaring:
1. Depressured unit down to 175 psi.
2. Depressured unit down to 175 psi.
3. Depressured unit down to 175 psi.
4. Depressured unit down to 0 psi
Monday, July 21, 2003
Page 1 of 1
I Facility
CENTRAL COMPRESSOR PLANT
Disposition
1. Sold
2. Reinjected
3. Flared or vented less than 1 hour.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
\operator I Field(s)
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU
Fuel
Assist
Volume MCF*
3,730,175
202,768,036
0
151 .../
33,281
5,222,228
0
0
211,753,871
0
0
224,913,669
15,355,655
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge
6. Used for lease operations
7. Other
TOTAL items 1 - 7
8. NGL gas equivalent produced
9. Purchased gas
Lift Gas, Off Field
10. Transferred from: FS 1, FS2, FS3, GC1, GC2, GC3
11. Transferred to: CGF
Remarks:
I ~erebY ce~ that th foregoing is true and correct to the best of my knowledge.
Signature: l/.. O. Title: SUPERVISOR
Form 10-422 (Revised 4/95)
I Month/Year of Disposition
08/2003
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 99.75%
PBU Midnight Sun Undefined 640158 0.25%
1. Safety
t 6 I MCF :::5BlL
2. Lease Use
MCF
3. Conserv. Purposes
MCF
M~~
Commissioner
:[0/7
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
August 2003
Page 1
IUnplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
o
IUnplanned Events greater than 1 hour
attachments
TOTAL
o
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Met
attachments
TOTAL
o
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
8/11/2003 1230-1630 151 See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
TOTAL
151
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
o
o
151
33,432
9/9/2003
9:04 AM
REPORT NO: 03-0478
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP
DATE: 11 Aug 2003
SYSTEM
TIME OF FLARING
Start Stop Duration
Black
Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 12:30 16:30 4Hrs OMins
~
o
~
151 MSCF
151 MSCF
TOTAL VOLUME
First Determination of Cause:
1. Shutdown TC 1813 for waterwash.
Action Taken to Stop Flaring:
1. System depressured.
Thursday, August 21, 2003
Page 1 of 1
Facility
CENTRAL COMPRESSOR PLANT
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
loperator Field(S)
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU
I MonthlYear of Disposition
09/2003
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
1. Sold
3. Flared or vented less than 1 hour.
321
Pool Name Code Percent
PRUDHOE 640150 99.75%
PBU Midnight Sun Undefined 640158 0.25%
4,089,235
2. Reinjected
195,737,890
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
o
5. Pilot and Purge
30,298
6. Used for lease operations
Fuel
Assist
5,329,931
o
7. Other
Lift Gas, Off Field
o
TOTAL items 1 . 7
205,187,675
1. Safety
MCF
8. NGL gas equivalent produced
o
2. Lease Use
MCF
9. Purchased gas
o
3. Conserv. Purposes
MCF
10. Transferred from: FS1, FS2, FS3, GC1, GC2, GC3
218,915,538
Commissioner
Date
11. Transferred to: CGF
15,848,305
Remarks:
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
I hereby ce~ that t~e foregoinA! is true and correct to the best of my knowledge.
Signature: (),Q. ~ Jv... Title: SUPERVISOR
Form 10-422 (Revised 4/95)
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
September 2003
Page 1
IUnplanned Events less than or equal to 1 hour
9/22/2003
1440-1445
135 Not required for unplanned events which
are less than or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
135
Events greater than 1 hour
See attachments
See attachments
TOTAL
o
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
9/26/2003
9/26/2003
0230-0235
0540-0545
135
51
See attachments
TOTAL
186
'Planned Events Exceeding 1 Hour OR Exceeding 5000 Met
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
135
o
186
o
TOTAL FLARED VOLUME
30,619
10/7/2003
10:29 AM
REPORT NO: 03-0543
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP DATE: 26 Sep 2003
TIME OF FLARING
SYSTEM Start .stop Duration
1. Flare/Relief Valve 02:30 02:35 OHrs 5Mins
2. Flare/Relief Valve 05:40 05:45 OHrs 5Mins
Black
fntermittent Smoke Planned V6LUME
0 0 ~ 135 MSCF
0 0 ~ 51 MSCF
TOTAL VOLUME 186 MSCF
First Determination of Cause:
1. Shut down Turbine Compressor 1806 for maint. and water wash.
2. Shut down turbine compressor 1806 from spin cooling for maint. and water wash.
Action Taken to Stop Flaring:
1. TIC train shut down complete.
2. TIC train shut down complete.
Monday, September 29, 2003
Page 1 of 1
~
I Facility
CENTRAL COMPRESSOR PLANT
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
operator Field(S)
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU
Month/Year of Disposition
1 0/2003
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
1. Sold
3. Flared or vented less than 1 hour.
3,827
Pool Name Code Percent
PRUDHOE 640150 99.75%
PBU Midnight Sun Undefined 640158 0.25%
4,475,763
2. Reinjected
206,960,141
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
o
5. Pilot and Purge
30,584
6. Used for lease operations
Fuel
Assist
5,636,792
o
7. Other
Lift Gas, Off Field
o
TOTAL items 1 - 7
217,107,107
1. Safety
MCF
8. NGL gas equivalent produced
o
2. Lease Use
MCF
9. Purchased gas
o
3. Conserv. Purposes
MCF
10. Transferred from: FS1, FS2, FS3, GC1, GC2, GC3
234,349,271
Commissioner
Date
11. Transferred to: CGF
19,736,545
I ~erebY ce~ t~t th
Signature: '<" U.
Form 10-422 (Revised 4/95)
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
"Remarks:
Title: SUPERVISOR
...
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
October 2003
IUnplanned Events less than or equal to 1 hour
10/4/2003
10/4/2003
10/4/2003
10/4/2003
10/4/2003
10/5/2003
10/5/2003
10/5/2003
10/5/2003
10/5/2003
10/6/2003
10/7/2003
10/7/2003
1715-1720
1735-1740
1805-1810
2234-2237
2341-2344
0435-0440
1210-1215
1245-1250
1415-1420
2223-2226
0555-0600
1315-1320
1405-1410
45 Not required for unplanned events which
45 are less than or equal to 1 hour
45
45
45
45
45
45
45
45
135
156
156
TOTAL
897
IUnplanned Events greater than 1 hour
See attachments
TOTAL
o
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Met
º~¡[I?Y¡¡¡[!I\III? "~f)~MI?:ºI?~ºfll~¡[IºNf)l"l!~.IºI?f\!]7!f<FºAUSI?
1 0/4/2003 0020-0025 156
10/4/2003 0100-0105 135
10/4/2003 1945-1948 135
10/4/2003 2250-2253 51
10/5/2003 0127-0132 135
10/5/2003 0745-0750 135
10/6/2003 0115-0120 135
10/7/2003 2215-2220 156
10/7/2003 2245-2250 32
10/8/2003 0250-0255 93
10/9/2003 2345-2350 156
Page 1
Not required for unplanned events which
are less than or equal to 1 hour
See attachments
. ACTION TAKEN Tf)EUMINA¡[ECAUSE :...
See attachments
11n/2003
1:55PM
10/10/2003
10/10/2003
10/10/2003
10/10/2003
1 0/11/2003
10/11/2003
10/11/2003
10/11/2003
10/11/2003
10/11/2003
10/28/2003
1 0/29/2003
10/29/2003
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
October 2003
Page 2
1250-1255
2020-2025
2240-2245
2330-2335
0845-0848
1005-1013
1335-1340
1735-1740
1805-1810
1835-1840
2345-2350
0245-0250
0250-0255
159
159
32
32
59
408
109
109
109
109
156
35
135
TOTAL
2,930
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Met
See attachments
See attachments
TOTAL 0
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour 0
Planned Events < 1 hour and not 2.930
exceeding 5,000 MCF
Planned Events> 1 hour or 0
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME 34,411
11/7/2003
1:55 PM
REPORT NO: 03-0552
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP DATE: 04 Oct 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 00:20 00:25 OHrs 5Mins 0 0 ~ 156 MSCF
2. Flare/Relief Valve 01:00 01:05 OHrs 5Mins 0 0 ~ 135 MSCF
3. Flare/Relief Valve 17:15 17:20 OHrs 5Mins ~ 0 0 45 MSCF
4. Flare/Relief Valve 17:35 17:40 OHrs 5Mins ~ 0 0 45 MSCF
5. Flare/Relief Valve 18:05 18:10 OHrs 5Mins ~ 0 0 45 MSCF
6. Flare/Relief Valve 19145 t9:48 .·.OHr.s .3Mins 0 0 ~ l35MSCF
7. Flare/Relief Valve 22:34 22:37 OHrs 3Mins ~ 0 0 45 MSCF
8. Flare/Relief Valve 22:50 22:53 OHrs 3Mins 0 0 ~ 51 MSCF
9. Flare/Relief Valve 23:4:1 23:44 OHrs 3Mins ~ 0 0 45· MSCF
TOTAL VOLUME 702 MSCF
First Determination of Cause:
1. Shut down 1811 for schedule maintenance. (Second stag nozzle replacement
2. Shut down 1007 fØf'6Cfleaulewat€f wash.
3. Depressured 1807 after water wash.
4. Depressured 1807 after water wash.
5. Depressured 1807 after water wash
6. Shut down tic 1803 for spin cool
7. Tried to restart tic 1807, tripped on flame failure
8. Esd tic 1803 for maintainance
9. Tried to start tic 1807, tripped on flame failure
Tuesday, October 21,2003
Page 1 of 2
FACILITY: CCP
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 04 Oct 2003
Action Taken to Stop Flaring:
1. Planned event.
2. Planned event.
3. Restarted unit.
4. Restarted unit.
5. Restarted unit.
6. Depressured unit
7. Depressured unit
8. Depressured unit
9. Depressured unit
Tuesday, October 21, 2003
REPORT NO: 03-0552
Page 2 of 2
REPORT NO: 03-0556
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP DATE: 05 Oct 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 01:27 01:32 OHrs 5Mins 0 0 ~ 135 MSCF
2. Flare/Relief Valve 04:35 04:40 OHrs 5Mins ~ 0 0 45 MSCF
3. Flare/Relief Valve 07:45 07:50 OHrs 5Mins 0 0 ~ .. 135.MSCF
4. Flare/Relief Valve 12:10 12:15 OHrs 5Mins ~ 0 0 45 MSCF
5. Flare/Relief Valve 12:45 12:50 OHrs 5Mins ~ 0 0 45 MSCF
6. Flare/Relief Valve 14:15 14:20 OHrs 5Mins ~ 0 0 45 MSCF
7. Flare/Relief Valve 22:23 22:26 OHrs 3Mins ~ 0 0 45 MSCF
TOTAL VOLUME 495 MSCF
First Determination of Cause:
1. Shut down T /C 1801 for water wash
2. Shut down T/C 1801
3. Shut down T /C 1813 for water wash
4. Shut down T/C 1813 spin cool
5. Shut down T/C 1813
6. Shut down T/C 1801
7. T/c 1801shut down. Bad fire eye
Action Taken to Stop Flaring:
1. Depressured unit
2. Depressured unit
3. Depressured unit
4. Depressured unit
Tuesday, October 21 , 2003
Page 1 of 2
FACILITY: CCP
ç µepressured unit.
h ~Depressured unit
7 ~epressured unit
Tuesday, October 21, 2003
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 05 Oct 2003
REPORT NO: 03-0556
Page 2 of 2
FACILITY: CCP
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
REPORT NO: 03-0560
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 06 Oct 2003
TIME OF FLARING
Start Stop Duration
01:15 01:20 OHrs
05:55 06:00 0 Hrs
First Determination of Cause:
1. Shut down T /C 1804 water wash.
Black
Intermittent Smoke
5Mins 0 0
5Mins ~ 0
Planned
~
o
TOTAL VOLUME
2. Shut down T/C 1813 repair exhaust thermocouple.
Action Taken to Stop Flaring:
1. Depressured unit.
2. Depressured unit.
Tuesday, October 21,2003
VOLUME
135 MSCF
135 MSCF
270MSGf
Page 1 of 1
REPORT NO: 03-0569
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP DATE: 07 Oct 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 13:15 13:20 OHrs 5Mins ~ 0 0 156 MSCF
2. Flare/Relief Valve 14:05 14:10 OHrs 5Mins ~ 0 0 156 MSCF
3. Flare/Relief Valve 22:15 22:20 OHrs 5Mins 0 0 ~ 156 MSCF
4. Flare/Relief Valve 22:45 22:50 OHrs 5Mins 0 0 ~ 32 MSCF
TOTAL VOLUME 500 MSCF
First Determination of Cause:
1. T/c 1811 tripped.cause unknown
2. T/c 1811 tripped. Flame failure
3. Gave tic 1810 normal stop to spin cool
4. Gave tic 1810 a stop. Instrumentation problem.
Action Taken to Stop Flaring:
1. Depressured unit
2. Depressured unit
3. Depressured unit
4. Depressured unit.
Tuesday, October 21, 2003
Page 1 of 1
REPORT NO: 03-0568
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP
DATE: 08 Oct 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 02:50 02:55 0 Hrs 5Mins 0 0 ~ 93 MSCF
TOTAL VOLUME
93 MSCF
First Determination of Cause:
1. Esd tic 1810 for maintainance
Action Taken to Stop Flaring:
1. Depressured unit
Tuesday, October 21, 2003
Page 1 of 1
REPORT NO: 03-0572
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP
DATE: 09 Oct 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 23:45 23:50 OHrs 5Mins 0 0 ~ 156 MSCF
TOTAL VOLUME
156 MSCF
First Determination of Cause:
1. Shutdown T/C 1812 for inspection & waterwash
Action Taken to Stop Flaring:
1. Depressured T/C 1812
Tuesday, October 21, 2003
Page 1 of 1
REPORT NO: 03-0574
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP DATE: 10 Oct 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 12:50 12:55 OHrs 5Mins 0 0 ~ 159 MSCF
2. Flare/Relief Valve 20:20 20:25 OHrs 5Mins 0 0 ~ 159 MSCF
3. Flare/Relief Valve 22:40 22:45 OHrs 5Mins 0 0 ~ 32,MSCF
4. Flare/Relief Valve 23:30 23:35 OHrs 5Mins 0 0 ~ 32 MSCF
TOTAL VOLUME 382 MSCF
First Determination of Cause:
1. Shutdown for P3A V repair & seal oil pump replacement on T/C 1811
2. Shutdown T /C 1809 for overhead crane load test
3. Shutdown T/C 1809 due to instrumentation problem
4. Shutdown T /C 1809 due to instrumentation problem
Action Taken to Stop Flaring:
1. Depressured T /C 1811
2. Depressured T/C 1809
3. Depressured T/C 1809
4. Depressured T/C 1809
Tuesday, October 21, 2003
Page 1 of 1
REPORT NO: 03-0575
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP DATE: 11 Oct 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 08:45 08:48 OHrs 3Mins 0 0 ~ 59 MSCF
2. Flare/Relief Valve 10:05 10:13 OHrs 8Mins 0 0 ~ 408 MSCF
3. Flare/Relief Valve 13:35 13:40 OHrs 5Mins 0 0 ~ t09MSCF
4. Flare/Relief Valve 17:35 17:40 OHrs 5Mins 0 0 ~ 109 MSCF
5. Flare/Relief Valve 18:05 18:10 OHrs 5Mins 0 0 ~ 109 MSCF
6. Flare/Relief Valve 18:35 18:40 OHrs 5Mins 0 0 ~ 109 MSCF
TOTAL VOLUME 903 MSCF
First Determination of Cause:
1. Igniter problems on start-up of T/C 1809.
2. SID T /C 1878 for water wash.
3. Shut down T/C 1878, spin cool complete.
4. T/C 1878 tripped on high vibration during start up.
5. TIC 1878 tripped on high vibration during start up.
6. T/C 1878 tripped on high vibration during start up.
Action Taken to Stop Flaring:
1. Unit depressured.
2. Unit depressured.
3. Unit depressured.
4. Unit depressured.
5. Unit depressured.
6. Unit depressured.
Tuesday, October 21, 2003
Page 1 of 1
REPORT NO: 03-0604
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP
DATE: 28 Oct 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 23:45 23:50 0 Hrs 5 Mins 0 0 ~ 156 MSCF
TOTAL VOLUME
156 MSCF
First Determination of Cause:
1. SID tic 1809 for planned maintenance
Action Taken to Stop Flaring:
1. depressured tic 1809 to 50 psi
Thursday, October 30, 2003
Page 1 of 1
-
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP
DATE: 29 Oct 2003
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING
Start Stop Duration
02:45 02:50 0 Hrs
02:50 02:55 0 Hrs
Intermittent
5 Mins 0
5 Mins 0
First Determination of Cause:
1. shut down tic 1809 from spin cool
2. sId tic 1805 from recycle for planned maintenance
Action Taken to Stop Flaring:
1. tic 1809 depressured to 0 psi
2. 1805 depressured to 50 psi
Thursday, October 30, 2003
REPORT NO: 03-0605
Black
Smoke Planned VOLUME
0 ~ 35 MSCF
0 ~ 135 MSCF
TOTAL VOLUME 12Q,MSCF
Page 1 of 1
I Facility
CENTRAL COMPRESSOR PLANT
Disposition
1. Sold
2. Reinjected
3. Flared or vented less than 1 hour.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
operator Field(S)
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU
Fuel
Assist
Volume MCF*
4,089,693
208,153,612
1,389
340 /
28,020
5,663,641
0
0
217,936,695
0
0
234,854,803
19,296,983
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge
6. Used for lease operations
7. Other
TOTAL items 1 . 7
8. NGL gas equivalent produced
9. Purchased gas
Lift Gas, Off Field
10. Transferred from: FS1, FS2, FS3, GC1, GC2, GC3
11. Transferred to: CGF
Remarks:
I hereby ce¡Hfy that Jhe fOregOin~ i~ true and correct to the best of my knowledge.
Signature: I..{. Q . \~~Å Title: SUPERVISOR
Form 10-422 (Revised 4/95)
Month/Year of Disposition
11/2003
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 99.75%
PBU Midnight Sun Undefined 640158 0.25%
1. Safety
'340 MCF J8,e-.
2. Lease Use
MCF
MCF
/! 2/ 4-
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
November 2003
IUnplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
11/19/2003 1415-1420 135 Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
135
IUnplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL
o
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mef
DATE TIME VOLUME DESCRIPTION OFINCIDENT& CAUSE
11/4/2003 0715-0745 135
11/4/2003 1020-1025 135
11/4/2003 1420-1435 135
11/4/2003 2310-2315 8
11/9/2003 1035-1040 135
11/9/2003 1330-1335 51
11/9/2003 1615-1620 408
11/12/2003 1845-1850 77
11/12/2003 1900-1905 14
11/12/2003 2150-2155 156
TOTAL
1,254
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Met
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
11/8/2003 0820-1100 340 See attachments
TOTAL
340
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
o
1,254
340
TOTAL FLARED VOLUME
29,749
Page 1
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
12/5/2003
10:20 AM
FACILITY: CCP
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
3. Flare/Relief Valve
4. Flare/Relief Valve
REPORT NO: 03-0612
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 04 Nav 2003
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
07:15 07:45 OHrs 30 Mins 0 0 ~ 135 MSCF
10:20 10:25 OHrs 5Mins 0 0 ~ "185'MS0f
14:20 14:35 OHrs 15Mins 0 0 ~ 135 MSCF
23:10 23:15 OHrs 5Mins 0 0 ~ 8 MSCF
TOTAL VOt::UME "4-13·'MS0F
First Determination of Cause:
1. Shut down T/C 1813 and depressure F104 header for valve repair and perimeter valve leak testing.
Manual vent down of unit.
2. Shut down T/C 1806 and depressurefoftubjngrepair:on F-56at.
3. Shut Down T/C 1802 forT-sheil pull, second stage bucket replacement and inspection. Depressure
F104 south wing header for perimeter.valve leak test. Manual vent down of unit.
4. Shutdown T /C 1805 after water-wash for shake test.
Action Taken to Stop Flaring:
1. T/C train and header depressured. F104av upstream manual blk valve repaired.
2. T/C train depressured. Repairs completed. T/C train restarted.
3. Shut down and leak test complete.
4. Depressured unit
Wednesday, November 19, 2003
Page 1 of 1
REPORT NO: 03-0620
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP
DATE: 08 Nav 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 08:20 11 :00 2 Hrs 40Mins 0 0 ~ 340 MSCF
TOTAL VOLUME'MO'MSCF
First Determination of Cause:
1. operational depressuring of injection line
Action Taken to Stop Flaring:
1. depressured line
Wednesday, November 19, 2003
Page 1 of 1
REPORT NO: 03-0623
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP DATE: 09 Nov 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 10:35 10:40 OHrs 5Mins 0 0 ~ 135 MSCF
2. Flare/Relief Valve 13:30 13:35 OHrs 5Mins 0 0 ~ 51'MSGf
3. Flare/Relief Valve 16:15 16:20 OHrs 5Mins 0 0 ~ 408 MSCF
TOTAL VOLUME 594 MSCF
First Determination of Cause:
1. Shut down T /C 1808 for T -Shell Pull /Bucket replacement
2. Shut down T /C 1808 after spincool
3. Shut down T /C 1878 for maintenance
Action Taken to Stop Flaring:
1. Depressured T /C 1808
2. Depressured TIGl808
3. Depressured T /C 1878
Wednesday, November 19, 2003
Page 1 of 1
REPORT NO: 03-0626
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP DATE: 12 Nov 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 18:45 18:50 OHrs 5Mins 0 0 ~ 77 MSCF
2. Flare/Relief Valve 19:00 19:05 OHrs 5Mins 0 0 ~ ''''I4''MSCf
3. Flare/Relief Valve 21:50 21:55 OHrs 5Mins 0 0 2J 156 MSCF
TOTAL VOLUME 247 MSCF
First Determination of Cause:
1. Valve sequence problems on T /C 1809 during startup
2. Valve sequence problems()n TIC 1808 during startup
3. Shutdown (normal stop) T/C 1809 duetoa oiUeak on the gearbox.
Action Taken to Stop Flaring:
1. Closed flare valve on TIC 1809 after reaching correct pressure
2. Depressured T/C'1808 to 50 psi
3. Depressured T /C 1809 to 50 psi
Wednesday, November 19, 2003
Page 1 of 1
I Facility
CENTRAL COMPRESSOR PLANT
1. Sold
2. Reinjected
Disposition
3. Flared or vented less than 1 hour.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
loperator I Field(s)
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU
Month/Year of Disposition
12/2003
Volume MCF*
*Indicate contribution of each pool to total.
4,463,249
Pool Name Code Percent
PRUDHOE 640150 99.75%
PBU Midnight Sun Undefined 640158 0.25%
231,427,227
o
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge
6. Used for lease operations
7. Other
8. NGL gas equivalent produced
9. Purchased gas
TOTAL items 1 - 7
o
29,878
Fuel
Assist
6,236,168
o
Lift Gas, Off Field
o
242,156,522
1. Safety
MCF
o
2. Lease Use
MCF
o
3. Conserv. Purposes
MCF
10. Transferred from: FS1, FS2, FS3, GC1, GC2, GC3
11. Transferred to: CGF
Remarks:
I hereby ce~that th
Signature: {¿. a..
Form 10-422 (Revised 4/95)
260,859,491
Commissioner
Date
21,346,857
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
true and correct to the best of my knowledge.
Title: SUPERVISOR
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
December 2003
Page 1
IUnplanned Events less than or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
o
Events greater than 1 hour
See attachments
See attachments
TOTAL
o
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
See attachments
TOTAL
o
Events
1 Hour OR Exceeding 5000 Mcf
See attachments
See attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
o
o
o
29,878
1/6/2004