FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) MonthNear of Disposition
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 01/2003
CENTRAL GAS FACILITY
Disposition Volume MCF*
1. Sold 2,880,729
2. Reinjected 12,385,310
3. Flared or vented less than 1 hour. 1,419
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 MC 25.235)
5. Pilot and Purge 30,536
6. Used for lease operations Fuel 3,404,235
Assist 35,890
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 18,738,119
.
8. NGL gas equivalent produced 2,880,729
9. Purchased gas 0
10. Transferred from: CCP 20,460,411
11. Transferred to: FS1, FS2, FS3 1,722,292
Remarks:
I hereby ceO. that t~ foregoing is true and correct to the best of my knowledge.
Signature: . D. ..A A MA 0 iA Title: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
January 2003
Page 1
Unplanned Events less than or equal to 1 hour
1/17/2003
1/19/2003
1345-1351
0935-0959
825 Not required for unplanned events which
88 are less than or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
913
See attachments
See attachments
TOTAL
o
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
. DATE ...... .TJME ..... .. VOLUME DESCRIPTION OF INCIDENT & CAUSE
1/4/2003 0147-0216 43 See attachments
1/11/2003 0445-051 0 33
1/18/2003 0245-0300 430
> ACTION TAKEN TO ELIMINATE CAUSE
See attachments
TOTAL
506
See attachments
See attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
o
506
o
67,845
2/7/2003
9:31 AM
REPORT NO: 03-0007
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF
DATE: 04 Jan 2003
SYSTEM
1. Flare/Relief Valve
TIME OF FLARING
Start Stop Duration
01:47 02:16 OHrs 29Mins
Black
Intermittent Smoke
Planned
o 0
~
VOLUME
43 MSCF
43 MSCF
TOTAL VOLUME
First Determination of Cause:
1. FLARED FOR CCP T/C1876 TANDEM SWAP TO LTS#1&2, USING
01 P203BIC, (RESIDUE GAS TO CCP). CCP UNABLE TO OPEN BYPASS LINE TO EQUALIZE
PRESSURE.
Action Taken to Stop Flaring:
1. CCP RELOADED T/C1876, PULLING OFF OF LTS#3, UNTIL VALVE
SHOP IS ABLE TO REPAIR BYPASS VALVE.
METER 664
Monday, January 20, 2003
Page 1 of 1
REPORT NO: 03-0039
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF
DATE: 11 Jan 2003
SYSTEM
1. Flare/Relief Valve
TIME OF FLARING
Start Stop Duration
04:45 05:10 0 Hrs 25Mins
Black
Intermittent Smoke
o 0
Planned
~
VOLUME
33 MSCF
33 MSCF
TOTAL VOLUME
First Determination of Cause:
1. Manipulated Residue Gas to HP flare valve P203AV to minimize upset to field associated with CCP
swapping T/C 1876 from L TS 3 feed to L TS1/2 feed.
Action Taken to Stop Flaring:
1. Completed compressor feed gas swapover, closed flare valve.
Monday, January 20,2003
Page 1 of 1
FACILITY: CGF
SYSTEM
1. Flare/Relief Valve
REPORT NO: 03-0035
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 18 Jan 2003
TIME OF FLARING
Start Stop Duration
02:45 03:00 0 Hrs 15 Mins
Black
Intermittent Smoke
o 0
TOTAL VOLUME
~
First Determination of Cause:
1. Flared during the planned shutdown of 1885 Tandem compressor for
the engine overhaul.
Action Taken to Stop Flaring:
1. Compresor case depressured and flare valves closed.
Monday, January 20, 2003
Planned
VOLUME
430 MSCF
430 MSCF
Page 1 of 1
CENTRAL GAS FACILITY
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) MonthNear of Disposition
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 02/2003
Facility
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
1. Sold
2,630,287
Pool Name
Code
Percent
2. Reinjected
11,464,387
PRUDHOE
640150
100.00%
3. Flared or vented less than 1 hour.
3,583
4. Flared or vented greater than 1 hour
(Supplemental report re uired - See 20 AAC 25.235)
26,851
5. Pilot and Purge
27,827
6. Used for lease operations
Fuel
Assist
7. Other
Lift Gas, Off Field
3,250,498
33,096
o
TOTAL items 1 - 7
17,436,529
1. Safety
'2(., gs I MCF J[5p-
I
8. NGL gas equivalent produced
2,630,287
2. Lease Use
MCF
9. Purchased gas
o
3. Conserv. Purposes
MCF
10. Transferred from: CCP
18,995,335
c~7
om miSSioner
~~~ t/;~3
Date
11. Transferred to: FS1, FS2, FS3
1,558,806
I hereby ce
Signature:
Form 10-422 (Revised 4/95)
is true and correct to the best of my knowledge.
Title: SUPERVISOR
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
Remarks:
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
February 2003
Page 1
lunplanned Events less than or equal to 1 hour
DATE TIME U:V:ºIl"IJIVII:' :'DESCFlIPTIºN'ºF'INC:lgEI'f['~º,A:IJ§¡;
2110/2003 2032-2042 328 Not required for unplanned events which
2/11/2003 0811-0823 387 are less than or equal to 1 hour
11/2003 1052-1103 387
2/11/2003 1305-1316 328
2/11/2003 1330-1340 387
2/11/2003 1348-1358 328
8
328
387
ACTION TAKEN TO EUMINATECAUSE
Not required for unplanned events which
are less than or equal to 1 hour
~~~
,-tv~
0.<t>kH less +L1ti.'^- 1 ~e-"\
b.,<J- OCCc...J..Jr........., ~
@ ~~, -h~ i1r
(~r s]:) :J.ßr2.-
4(It(Ò3
1613-1623
1716-1726
TOTAL
3,188 ~ ZA73)-?
IUnplanned Events ~reater than 1 hour
DATE TIME VOL\JME .. DESCRIPTION OF INCIDENT & CAUSE
2/11/2003 0812-0936 5,560 See attachments
11/2003 1052-1204 3'856~ 3'fi7 )?
111/2003 1300-1513 8,712 :+ 104.3) ?
/11/2003 1515-1808 8,293 + 1af-3) ~
TOTAL 26,421 (+ 2 +73) ?
tPlanned Events Less Than or Equal 1 Hour AND Not Exceedin~ 5000 Mcf
DATE . .. TIME VOLUME '. DESCRIPTION OF INCIDENT ~ CAUSE· .
2/912003 0125-0140 387 See attachments
2/10/2003 0930-1015 8
ACTI(>f\I TAKEN TO EUMINATECAUSE
See attachments
ACTlÔN TAKEN TO EUMINATE CAUSE' .
See attachments
TOTAL
395
tPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME . DESCRIPTION OF INCIDENT & CAUSE
2/1712003 0625-0730 430 See attachments
.. ACTION TAKEN TO EUMINATE CAIJSE. .
See attachments
TOTAL
430
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
26,421
395
430
TOTAL FLARED VOLUME
91.357
3/10/2003
4:30 PM
FACILITY: CGF
SYSTEM
1. Flare/Relief Valve
REPORT NO: 03-0080
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 09 Feb 2003
TIME OF FLARING
Start Stop Duration
01 :25 01 :40 0 Hrs 15Mins
First Determination of Cause:
1. blewdown T /C 1855 ,
meter 618
Action Taken to Stop Flaring:
1. completed blowdown
Monday, February 24, 2003
Black
Intermittent Smoke
o 0
Planned
TOTAL VOLUME
~
VOLUME
387 MSCF
387 MSCF
Page 1 of 1
REPORT NO: 03-0081
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF
DATE: 10 Feb 2003
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
09:30 10:15 OHrs 45Mins 0 0 ~ 8 MSCF
20:32 20:42 OHrs 10 Mins 0 0 0 328 MSCF
TOTAL VOLUME 336 MSCF
First Determination of Cause:
1. MI 2 purge and pressurize for starting
2. MI2 SD ON HIGH SUCTION DRUM LEVEL,METER 618
Action Taken to Stop Flaring:
1.
2. BLEW DOWN TO SET PRESSURE
Monday, February 24, 2003
Page 1 of 1
REPORT NO: 03-0083
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF DATE: 11 Feb 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 08:12 09:36 1 Hrs 24Mins ~ 0 0 5,560 MSCF
2. Flare/Relief Valve 10:52 12:04 1 Hrs 12 Mins ~ 0 0 3,856 MSCF
3. Flare/Relief Valve 13:00 15:13 2Hrs 13 Mins ~ 0 0 8,712 MSCF
4. Flare/Relief Valve 15:15 18:08 2Hrs 53 Mins ~ 0 0 8,293 MSCF
TOTAL VOLUME 26,421 MSCF
First Determination of Cause:
1. Shutdown MI#2 to install a fitting on recently overhauled turbine. Turbine was received from Rolls
Royce factory with part missing. Flare volume indicated by Meter 660
2. Performing performance testing of MI#2 to reverify data. Retesting due to missing fitting on turbine.
During testing, unit became unstable and shutdown. Flare volume indicated by meter 660
3. Several shutdowns during this period of performance testing of MI#2. Performance testing caused
process upset. Flaring indicated by meter 660
4. Performance testing of MI#2 caused process upset. PERFORMANCE TESTING COMPLETE Unit
went down on high level in HP suction drum. Flaring indicated by Meter 660
Action Taken to Stop Flaring:
1. Restarted MI #2 stabilized process
2. Restarted MI#2 stabilized process
3. Adjusted process to minimize flare. Restarted MI#2 after several restart attempts.
4. Several restarts attemptted on MI#2. Adjusted process to minimize flaring. Restarted MI#2.
Monday, February 24, 2003
Page 1 of 1
FACILITY: CGF
SYSTEM
1. Flare/Relief Valve
REPORT NO: 03-0093
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 17 Feb 2003
TIME OF FLARING
Start Stop Duration
06:25 07:30 1 Hrs 5Mins
First Determination of Cause:
1. Vented WGlline for welding. Point Mac line work!!
Action Taken to Stop Flaring:
1. Completed venting.
Monday, February 24, 2003
Black
Intermittent Smoke
o 0
Planned
~
TOTAL VOLUME
VOLUME
430 MSCF
430 MSCF
Page 1 of 1
CENTRAL GAS FACILITY
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 03/2003
Facility
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
1. Sold
2,834,061
Pool Name
Code Percent
2. Reinjected
12,164,922
PRUDHOE
640150 100.00%
3. Flared or vented less than 1 hour.
5,642
20,629
5. Pilot and Purge
30,810
6. Used for lease operations
Fuel
Assist
3,584,084
35,317
7. Other
Lift Gas, Off Field
o
TOTAL items 1 - 7
18,675,465
1. Safety
ZD,bZ}1 MCF (J&e-
8. NGL gas equivalent produced
2,834,061
2. Lease Use
MCF
9. Purchased gas
o
3. Conserv. Purposes
MCF
,
10. Transferred from: CCP
20,380,223
fw.-Þ¡ ~~ ~
Commissioner
Date
11. Transferred to: FS 1, FS2, FS3
1,704,758
I hereby ce
Signature:
Form 10-422 (Revised 4/9 )
is true and correct to the best of my knowledge.
Title: SUPERVISOR
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
Remarks:
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT· CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
March 2003
IUnplanned Events less than or equal to 1 hour
. ······[)·E··· ··················TIMET············ ·····¥ºIZt!M'ª·º§ª~I¡!J~Iºf,Iº;i·.~Iº"ªf,I;ri~º.IJª'ªTnT ··········r.ºmf,litmf,l';rºr§!+IMII\I.~·'l1§tº~t!$,§·.···.·,·,····.............
3/6/2003 1140-1144 195 Not required for unplanned events which Not required for unplanned events which
3/6/2003 1147-1200 328 are less than or equal to 1 hour are less than or equal to 1 hour
3/6/2003 1147-1200 387
3/6/2003 1554-155 195
3/7/2003 1529-1545 387
~..,( -!-v 3/7/2003 1529-1629 3,750
(6$5 ¿;J bcl-êr..3/27/2003 1803-1818 400
),(J:: ~Kr;;&E.'.--s. ;;
l
TOTAL
5,642
(unplanned Events ~reater than 1 hour . .
... . PATE .... ...... TIME . ". ···..VOIZUM.E.< PESCRIPTIQ"'O~INÇIP·EtIIT~C"USE. ..... ..... <ACTlØt,¡TA~E'HØ·EUMINJ'.l1n:;"U$E. ....,.
3/6/2003 1147-1307 20,629 See attachments See attachments
TOTAL
20,629
tPlanned E~entsLe~s Than or E9ual1 Hour AND N()t ExceedinH 5000 Mct .1
···,··.··.···...PATE··'·· ···············,······"··TIME.·..·········· .···,..·.··..VØ2,UME·UPESCRIPrløtll.Q~·INÇIPEtIIT!rtU~USE.·'···, ··,·····,··········.···A.¢rIQ!Itl[:AKE!!!::)¡Q:.EUJMI~tE:ÇÂ!.!$e'H..:..:..........
See attachments See attachments
TOTAL
o
rPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mct ...... .1
······PÞi'rE·:···:··································.·..·'rIME··..·.····T··················.·.·¥Q!i,t!ME·········g§ªºRII>:'rlQ!!!:º¡;;'I~lg§f,I'ri!R'º~tJª/;···:·····,·,··· ···········:'TA'I¡:'I'.IQI[fT'I'.Hf;f,I'rQ§UJMlt'I.Þi'r§:c'ÞiIJ$,/;'U···
See attachments See attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
20,629
o
o
92.398
Page 1
J
I
4/14/2003
11:15AM
FACILITY: CGF2
SYSTEM
1. Flare/Relief Valve
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 06 Mar 2003
TIME OF FLARING
Start Stop Duration
11:47 13:07 1Hrs 20Mins
Black
Intermittent Smoke
~ 0
TOTAL VOLUME 20,629 MSCF
REPORT NO: 03-0121
Planned VOLUME
o 20,629 MSCF
First Determination of Cause:
1. Loss of both MI compressors due to loss of feed. Booster Compressor 1801 tripped off line and
caused upset in the L TS section of plant. Volume indicated by meter 660
Action Taken to Stop Flaring:
1. Both MI trains restarted
Monday, March 31, 2003
Page 1 of 1
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) MonthNear of Disposition
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 04/2003
CENTRAL GAS FACILITY
Disposition Volume MCF*
1. Sold 2,585,512
2. Reinjected 10,844,580
3. Flared or vented less than 1 hour. 6,508
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 28,988
6. Used for lease operations Fuel 3,281,551
Assist 45,247
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 16,792,386
8. NGL gas equivalent produced 2,585,512
9. Purchased gas 0
10. Transferred from: CCP 18,349,335
11. Transferred to: FS1, FS2, FS3 1,556,949
Remarks:
I hereby certiL)O,ttoregOing is true and correct to the best of my knowledge.
Signature: ...Å... A J 1. Title: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
April 2003
IUnplanned Events less than or equal to 1 hour
DATE TIME VOI..UMEDESCRIPTIONUOFUINCIDENTU&UCAUSE
4/8/2003 0419-0427 20 Not required for unplanned events which
4/16/2003 0047-0057 86 are less than or equal to 1 hour
4/17/2003 0145-0200 72
4/17/2003 0205-0210 72
4/17/2003 0215-0220 72
4/17/2003 0230-0235 72
4/17/2003 0707-0712 72
4/17/2003 1010-1110 98
4/17/2003 1458-1505 72
4/20/2003 1238-1255 387
4/20/2003 1240-1337 2,019
4/20/2003 1407-1420 387
4/20/2003 1529-1542 387
4/20/2003 1530-1600 735
4/26/2003 0700-0705 246
Page 1
TOTAL
4,797
IUnplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL
o
~Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
4/1/2003 0205-0300 544 See attachments
4/1 0/2003 0020-0050 190
4/11/2003 0030-0100 190
4/16/2003 0106-0150 387
4/16/2003 1720-1740 400
TOTAL
1,711
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
5/7/2003
4:11 PM
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
April 2003
Page 2
Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
4,797
o
1,711
80,743
o
o
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
5n /2003
4:11 PM
REPORT NO: 03-0162
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF
DATE: 01 Apr 2003
SYSTEM
1. Flare/Relief Valve
TIME OF FLARING
Start Stop Duration
02:05 03:00 0 Hrs 55 Mins
Black
Intermittent Smoke
Planned
o 0
~
VOLUME
544 MSCF
544 MSCF
TOTAL VOLUME
First Determination of Cause:
1. Depressuring the WGlline for removing valave and installing spool on PT. Mac tie to WGI.
Meter 618
Action Taken to Stop Flaring:
1. Line was depressured for repair and modifications.
Wednesday, April 30, 2003
Page 1 of 1
FACILITY: CGF
SYSTEM
1. Flare/Relief Valve
REPORT NO: 03-0199
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 10 Apr 2003
TIME OF FLARING
Start Stop Duration
00:20 00:50 0 Hrs 30Mins
First Determination of Cause:
1. SID Tandem #4 for a Waterwash
Action Taken to Stop Flaring:
1. Flaring complete---MTR#618
Wednesday, April 30, 2003
Black
Intermittent Smoke
o 0
Planned
TOTAL VOLUME
~
VOLUME
190 MSCF
190 MSCF
Page 1 of 1
FACILITY: CGF
SYSTEM
1. Flare/Relief Valve
REPORT NO: 03-0200
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 11 Apr 2003
TIME OF FLARING
Start Stop Duration
00:30 01:00 0 Hrs 30 Mins
First Determination of Cause:
1. SID Tandem #2 for Waterwash
Action Taken to Stop Flaring:
1. Oepressure Completed--Mtr#618
Wednesday, April 30, 2003
Black
Intermittent Smoke
o 0
Planned
TOTAL VOLUME
~
VOLUME
190 MSCF
190 MSCF
Page 1 of 1
REPORT NO: 03-0222
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF DATE: 16 Apr 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 00:47 00:57 OHrs 10 Mins 0 0 0 ~ MSCF
2. Flare/Relief Valve 01:06 01:50 OHrs 44 Mins 0 0 ~ 387 MSCF
3. Flare/Relief Valve 17:20 17:40 OHrs 20Mins 0 0 ~ 400 MSCF
TOTAL VOLUME 873 MSCF
First Determination of Cause:
1. Upset in stabs when MI1 SID for maint. Meter 660
2. SID 1805 for a GG Change-out
3. Tandem 2 SID for maint./testing
Action Taken to Stop Flaring:
1. Adjusted process
2. Depressure Comptete--MTR#660
3. Work complete and machine restarted
Wednesday, April 30, 2003
Page 1 of 1
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) MonthNear of Disposition
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU OS/2003
CENTRAL GAS FACILITY
Disposition Volume MCF*
1. Sold 2,465,541
2. Reinjected 9,389,312
3. Flared or vented less than 1 hour. 5,239
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 29,342
6. Used for lease operations Fuel 3,251,592
Assist 39,338
7. Other Lift Gas, Off Field 0
MI to GPMA 978,788
TOTAL items 1 - 7 16,159,152
8. NGL gas equivalent produced 2,465,541
9. Purchased gas 0
10. Trånsferred from: CCP 17,636,542
11. Transferred to: FS1, FS2, FS3 1,477,390
Remarks:
I hereby ceTI. Cr tr fOregOi~VS true and correct to the best of my knowledge.
Signature: . . 1 A ~ '^ Title: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
May 2003
Page 1
IUnplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDeNT 8< CAUSE
5/1/2003 0048-0052 4 Not required tor unplanned events which
5/1/2003 0130-0133 4 are less than or equal to 1 hour
5/6/2003 0615-0620 387
5/6/2003 0714-0719 387
5/6/2003 0728-0733 387
5/6/2003 1010-1019 142
5/6/2003 1047-1054 923
5/6/2003 1101-1104 422
5/6/2003 1232-1253 822
5/6/2003 1324-1329 350
5/10/2003 1944-1955 430
5/22/2003 0354-0430 41
TOTAL
4,299
IUnplanned Events greater than 1 hour
DATE TIME VOLUME
DESCRIPTION OF INCIDENT 8< CAUSE
See attachments
TOTAL
o
~Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATe TIME VOLUME DeSCRIPTIONOF INCIDENT·& CAUSE
5/9/2003 0230-0251 450 See attachments
5/9/2003 0917-0947 60
5/31/2003 0007-0010 400
5/31/2003 0227-0229 30
TOTAL
940
~Planned Events Exceeding 1 Hour OR Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT 8< CAUSE
See attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
TOTAL
4,299
o
940
o
73.919
ACTION TAKEN TO ELIMINATE CAUSE
Not required tor unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
6/9/2003
11:25AM
REPORT NO: 03-0284
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF
DATE: 09 May 2003
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
02:30 02:51 o Hrs 21 Mins 0 0 ~ 450 MSCF
09:17 09:47 OHrs 30 Mins 0 0 ~ 60 MSCF
TOTAL VOLUME 510 MSCF
First Determination of Cause:
1. Booster 1801 SD and Booster 1802 SD and blowdown for water wash and valve repair on 1802
2. Booster 1801 Depressured for Valve work
Action Taken to Stop Flaring:
1. Depressure Completed
2. Depressure Completed
Friday, May 23, 2003
Page 1 of 1
REPORT NO: 03-0348
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF
DATE: 31 May 2003
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
00:07 00:10 OHrs 3Mins 0 0 ~ 400 MSCF
02:27 02:29 OHrs 2Mins 0 0 ~ 30 MSCF
TOTAL VOLUME 430 MSCF
First Determination of Cause:
1. Shutdown of 1883 Tandem T/C for turbine overhaul.
2. Completed depressurizing 1883 compressor
Action Taken to Stop Flaring:
1. Let it depressure to 60 psi
2. Pressure taken to 0 psi
Sunday, June 01, 2003
Page 1 of 1
Facility
CENTRAL GAS FACILITY
Disposition
1. Sold
2. Reinjected
3. Flared or vented less than 1 hour.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) MonthNear of Disposition
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 06/2003
Volume MCF*
2,317,576
8,222,536
3,822
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge
6. Used for lease operations
7. Other
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from: CCP
11. Transferred to: FS1, FS2, FS3
Remarks:
TOTAL items 1 - 7
Signature:
Form 10-422 (Revised 4/95)
is true and correct to the best of my knowledge.
Title: SUPERVISOR
350
28,438
Fuel
Assist
Lift Gas, Off Field
MI to GPMA
o
1,575,854
15,144,145
2,317,576
o
16,728,639
1,584,494
*Indicate contribution of each pool to total.
Pool Name
Code
Percent
PRUDHOE
640150
100.00%
../
1. Safety
3'50
~Bp-
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
7#!Þ
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
June 2003
~UnPlanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
6/4/2003 1916-1933 80 Not required for unplanned events which
6/9/2003 0827-0837 195 are less than or equal to 1 hour
6/9/2003 1011-1021 400
6/9/2003 0832-0848 14
6/11/2003 1526-1528 5
6/22/2003 2225-2240 195
6/22/2003 2230-2245 387
6/22/2003 2240-2245 2
6/22/2003 2340-2355 195
6/23/2003 2230-2245 328
6/23/2003 2240-2245 2
6/26/2003 1500-1518 430
Page 1
TOTAL
2,233
~UnPlanned Events greater than 1 hour
DATE TIME VOLUME
DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL
o
¡Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
6/2/2003 0156-0159 300 See attachments
6/2/2003 0331-0352 350
6/9/2003 2048-2140 920
6/29/2003 0300-0310 19
TOTAL
1,589
~Planned Events Exceeding 1 Hour OR Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
6/2/2003 1350-1500 350 See attachments
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
TOTAL 350
TOTAL
Unplanned Events < 1 Hour 2,233
Unplanned Events> 1 Hour 0
Planned Events < 1 hour and not 1,589
exceedin9 5,000 MCF
Planned Events> 1 hour or 350
exceeding 5,000 MCF
Pilot Purge
Assist 7/9/2003
TOTAL FLARED VOLUME 72,870 2:43PM
REPORT NO: 03-0351
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF DATE: 02 Jun 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 01:56 01:59 OHrs 3Mins 0 0 ~ 300 MSCF
2. Flare/Relief Valve 03:31 03:52 OHrs 21 Mins 0 0 ~ 350 MSCF
3. Flare/Relief Valve 13:50 15:00 1 Hrs 10 Mins 0 0 ~ 350 MSCF
TOTAL VOLUME 1,000 MSCF
First Determination of Cause:
1. Blew down compressor 1857 after shutdown to clear axial vibration to allow cranking for cool down
2. Blew down compressor after crank cooling complete
3. Slow leakby on battery isolation valves allowed compressor to repressurize before scheduled
maintenance could be done. Compressor needed to be depressured for scheduled maint work.
Action Taken to Stop Flaring:
1. Shut flare valve when axial vibration cleared at 90 psi
2. Let compressor depressure to 0 psi
3. Depressured compressor to 0 psi for maint. Meter 618
Thursday, June 26, 2003
Page 1 of 1
FACILITY: CGF
SYSTEM
1. Flare/Relief Valve
REPORT NO: 03-0377
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 09 Jun 2003
TIME OF FLARING
Start Stop Duration
20:48 21:40 OHrs 52Mins
Black
Intermittent Smoke
~ 0
TOTAL VOLUME
~
First Determination of Cause:
1. 1883 tandem compressor depressure startup purge
Action Taken to Stop Flaring:
1. Compressor start sequence completed and compressor loaded
Meter Number 549
Thursday, June 26, 2003
Planned
VOLUME
920 MSCF
920 MSCF
Page 1 of 1
FACILITY: CGF
SYSTEM
1. Flare/Relief Valve
REPORT NO: 03-0400
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 29 Jun 2003
TIME OF FLARING
Start Stop Duration
03:00 03:10 0 Hrs 10Mins
First Determination of Cause:
1. Depressured fuel gas line for a valve replacement.
Action Taken to Stop Flaring:
1. Line depressured. Volume indicated by meter 618
Monday, June 30, 2003
Black
Intermittent Smoke
o 0
Planned
TOTAL VOLUME
~
VOLUME
19 MSCF
19 MSCF
Page 1 of 1
GPB Flaring Incident
Subject: GPB Flaring Incident
Date: Thu, 12 Jun 2003 12:23:25 -0500
From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com>
To: steve_mcmains@admin.state.ak.us
CC: "Fiedler, Anne M" <FiedleAM@BP.com>, "Benson, Gary A" <BensonGA@BP.com>,
"Pfeiffer, Jim A" <PfeiffJA@BP.com>,
"GPB, Environ Advisor West" <GPBEnvironAdvisorWest@BP . com>,
"GPB, Environ TL" <GPBEnvironTL@BP.com>,
"GPB, Environ Advisor East" <GPBEnvironAdvisorEast@BP.com>
>
From:
Michael Bolkovatz, GPB Prod Optim Team Leader, 907-659-5566
>
> An extended flare incident occurred on June 09, 2003~;i'~,},Booster
compressor 1802 shutdown due to a governor malfunction at 08:30 a~. Later
that same day, the CGF boosters unloaded due to a similar instrumentation
malfunction. In order to alleviate the high gas transit line pressure that
these compressor shutdowns caused, flaring was initiated at FS1 and GC1.
During the first event, FS1 flared 17.1 MMSCF over 1 hr, 17 mins, and GC1
flared 11.3 MMSCF over 1 hr, 5 mins. During the 2nd event, FS1 flared 3.9
MMSCF over 26 mins, and GC1 flared 3.0 MMSCF over 29 mins. Total flare time
was 4 hours and 8 minutes, total flare volume was 513 MSCF.
>
> If you require additional information, please don't hesitate to call
me.
>
> Mi chael Bolkova tz
> GPB Production Optimization TL
> 659-5566
>
>
>
10fl
6/12/20039:30 AM
CENTRAL GAS FACILITY
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
I Operator I Field(s)
I BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU
I MonthNear of Disposition
I 07/2003
Facility
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
1. Sold
2,102,550
Pool Name
Code
Percent
2. Reinjected
5,705,208
PRUDHOE
640150
100.00%
3. Flared or vented less than 1 hour.
1,267
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
1,158
5. Pilot and Purge
28,766
6. Used for lease operations
Fuel
Assist
2,821,171
34,600
7. Other
Lift Gas, Off Field
MI to GPMA
o
1,252,412
TOTAL items 1 - 7
11,947,132
1. Safety
/JJt5"~MCF ~¡L
8. NGL gas equivalent produced
2,102,550
2. Lease Use
MCF
9. Purchased gas
o
3. Conserv. Purposes
MCF
10. Transferred from: CCP
13,498,367
/~~A þ~> ¿£ t/l
./ L....
Commissioner
ß/lzÞ3
{ t
Date
11. Transferred to: FS1, FS2, FS3
1,551,235
Remarks:
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
Signature:
Form 10-422 (Revised 4/95)
Title: SUPERVISOR
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
July 2003
Page 1
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTIONOFINCIOEN'U'CAUSE
7/11/2003 1435-1450 76 Not required for unplanned events which
7/22/2003 0338-0405 56 are less than or equal to 1 hour
7/22/2003 0425-0432 33
7/22/2003 0715-0723 387
7/27/2003 0108-0111 328
TOTAL
880
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTIONTAKENTO ELIMINATE CAUSE
See attachments
~Unplanned Events greater than 1 hour
DATE TIME vOLUME DESCRIPTION OFINCIDENT& CAUSE
7/3/2003 1526-1829 1,158 See attachments
TOTAL
1,158
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
¡Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OFINCIDENT & CAUSE
7/12/2003 0800-0815 387 See attachments
TOTAL
387
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OFINCIDENT & CAUSE
See attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
TOTAL
880
1,158
387
o
65,791
8/11/2003
11:10AM
bp
REPORT NO: 03-0413
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF
DATE: 03 Jul 2003
SYSTEM
1. Flare/Relief Valve
TIME OF FLARING
Start Stop Duration
15:26 18:29 3 Hrs 3 Mins
Black
Intermittent Smoke
o 0
Planned VOLUME
o 1,158 MSCF
TOTAL VOLUME 1,158 MSCF
First Determination of Cause:
1. MI T/C 1805 SHUT DOWN ON ENTRONICS CONTROL PANEL
SEQUENCER FAULT, CAUSED BY A BLOWN FUSE.
Action Taken to Stop Flaring:
1. INSTRUMENT TECH TROUBLE SHOOTED AND REPLACE BLOWN
FUSE. UNIT WAS RESTARTED AT 1755, AND LOADED AT 1835
Monday, July 21, 2003
Page 1 of 1
FACILITY: CGF
SYSTEM
1. Flare/Relief Valve
REPORT NO: 03-0429
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 12 Jul 2003
TIME OF FLARING
Start Stop Duration
08:00 08:15 0 Hrs 15Mins
First Determination of Cause:
1. T /C 1805 Shutdown to repair oil leak. BESD
Action Taken to Stop Flaring:
1. Blowdown completed
Meter #618
Monday, July 21,2003
Black
Intermittent Smoke
o 0
Planned
TOTAL VOLUME
~
VOLUME
387 MSCF
387 MSCF
Page 1 of 1
CENTRAL GAS FACILITY
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) MonthNear of Disposition
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 08/2003
Facility
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
1. Sold
2,183,172
Pool Name
Code
Percent
2. Reinjected
8,093,380
PRUDHOE
640150
100.00%
3. Flared or vented less than 1 hour.
9,853
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
4,890
5. Pilot and Purge
22,862
6. Used for lease operations
Fuel
Assist
2,988,224
5,468
7. Other
Lift Gas, Off Field
MI to GPMA
o
512,655
TOTAL items 1 ·7
13,820,504
1. Safety
4<¿/tv MCF 'cø¡e-
I
8. NGL gas equivalent produced
2,183,172
2. Lease Use
MCF
9. Purchased gas
o
3. Conserv. Purposes
MCF
10. Transferred from: CCP
15,355,655
~ ß~~-C
Commissioner
/llr/LJ
Date
11. Transferred to: FS1, FS2, FS3
1,535,151
Remarks:
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
Signature:
Form 10-422 (Revised 4/95)
Title: SUPERVISOR
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GA$ FACILITY
GAS FLARING INCIDENT REPORT
August 2003
Page 1
lunplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
8/11/2003 1234-1242 387 Not required for unplanned events which
8/11/2003 1235-1312 2,112 are less than or equal to 1 hour
8/12/2003 1110-1120 387
8/12/2003 1326-1400 387
8/12/2003 2257-2333 387
8/12/2003 2312-2400 1,712
8/13/2003 1924-1930 148
8/13/2003 1938-2012 754
8/13/2003 2116-2200 1,646
8/29/2003 0810-0825 387
8/29/2003 0810-0830 1,546
TOTAL
9,853
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Junplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
8/12/2003 1220-1325 2,155 See attachments
8/23/2003 0145-0330 15
TOTAL
2,170
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOWME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL
o
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
8/23/2003 0922-1115 2,720 See attachments
TOTAL
2,720
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5.000 MCF
Planned Events> 1 hour or
exceeding 5.000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
2,170
o
2.720
43,073
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
9/9/2003
9:03 AM
FACILITY: CGF
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
3. Flare/Relief Valve
4. Flare/Relief Valve
5. Flare/Relief Valve
..
REPORT NO: 03-0479
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 12 Aug 2003
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
11 :10 11:20 OHrs 10Mins 0 0 0 --:1
s r
12:20 13:25 1 Hrs 5Mins ~ 0 0 2.155MßCF· - l"'fle
13:26 14:00 OHrs 34 Mins 0 0 0 38J'"~ ~?
22:57 23:33 OHrs 36Mins 0 0 0 387 MSCF
23:12 24:00 OHrs 48Mins ~ 0 0 1,712 MSCF
TOTAL VOLUME 5,028 MSCF
First Determination of Cause:
1. MI1 on Recycle trip Meter 618
2. Unloading MI 2 in attempt to get MI 1 to take load Meter 660
3. MI1 on Recycle trip Meter 618
4. Mi1 tripped on hp drum high level.Meter618
5. Stabilizer overhead drom high pressure due to the loss of M11. Meter660
Action Taken to Stop Flaring:
1. completed blowdown
2. Warmed up L TS bottoms to reduce MI make
3. completed blowdoan
4. Completed blowdown.
5. Loaded MI#2
Thursday, August 21, 2003
Page 1 of 1
REPORT NO: 03-0493
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF
DATE: 23 Aug 2003
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
01:45 03:30 1 Hrs 45Mins ~ 0 0 15 MSCF
09:22 11 :15 1 Hrs 53 Mins ~ 0 ~ 2,720 MSCF
TOTAL VOLUME 2;735'MSCf ./
First Determination of Cause:
1. PROCESS UPSET DUE TO L TS 3 DERIME
2. LTS 3 BESD FOR MAl NT.
Action Taken to Stop'Ffaring:
1. STABILIZED PROCESS
2. COMPLETED BLOWDOWN
VVednesday, August27,2003
Page 1 of 1
..
CENTRAL GAS FACILITY
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
I Operator I Field(s)
I BP EXPLORATION, ALASKA I EASTERN OPERATING AREA-PBU
I Month/Year of Disposition
I 09/2003
Facility
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
1. Sold
2,115,953
Pool Name
Code
Percent
2. Reinjected
7,767,317
PRUDHOE
640150
100.00%
3. Flared or vented less than 1 hour.
7,141
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
19,033
5. Pilot and Purge
22,974
6. Used for lease operations
Fuel
Assist
2,736,967
18,183
7. Other
Lift Gas, Off Field
MI to GPMA
o
1,636,855
TOTAL items 1 - 7
14,324,423
1. Safety
14 D3.3 MCF ü6l1-
(
8. NGL gas equivalent produced
2,115,953
2. Lease Use
MCF
9. Purchased gas
o
3. Conserv. Purposes
MCF
10. Transferred from: CCP
15,848,305
)Ihb
f
Commissioner
Date
11. Transferred to: FS1, FS2, FS3
1,523,882
I hereby ceMy that t e foregoi g is true and correct to the best of my knowledge.
Signature:~'¿ .0, Title: SUPERVISOR
Form 10-422 (Revised 4/95)
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
Remarks:
,
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT· CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
September 2003
Page 1
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
9/9/2003 1040-1055 195 Not required for unplanned events which
9/9/2003 1042-1059 328 are less than or equal to 1 hour
9/9/2003 1141-1204 387
9/9/2003 1340-1355 328
9/9/2003 1900-1925 328
9/9/2003 1950-1955 328
9/9/2003 2015-2017 328
9/13/2003 0350-0400 328
9/14/2003 2300-2400 2,720
9/20/2003 0956-1008 23
9/20/2003 1640-1653 387
9/20/2003 1653-1736 346
9/29/2003 1040-1112 400
TOTAL
6,426
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
¡UnPlanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
9/9/2003 1042-1336 11,882 See attachments
TOTAL
11,882
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
¡Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
917/2003 0735-0742 190 See attachments
9/17/2003 2345-2400 430
9/26/2003 2129-2155 95
TOTAL
715
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
tPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
9/15/2003 1050-1210 3,111 See attachments
9/15/2003 2310-0040 4,040
TOTAL
7,151
TOTAL
6.426
11,882
715
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
7,151
TOTAL FLARED VOLUME
67,331
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
10/7/2003
10:29 AM
FACILITY: CGF
SYSTEM
1. Flare/Relief Valve
REPORT NO: 03-0508
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 07 Sep 2003
TIME OF FLARING
Start Stop Duration
07:35 07:42 0 Hrs 7Mins
Black
Intermittent Smoke
Planned
o 0
~
TOTAL VOLUME
First Determination of Cause:
1. Shut down tandem turbine 1885 to investigate a compressor seal/drain problem.
Action Taken to Stop Flaring:
1. Compleded venting of compressor: Mtr (618)
Tuesday, September 23, 2003
VOLUME
190 MSCF
190 MSCF
Page 1 of 1
REPORT NO: 03-0516
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF DATE: 09 Sep 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Controlled Blowdow 10:40 10:55 OHrs 15 Mins 0 0 0 195 MSCF
2. Controlled Blowdow 10:42 10:59 OHrs 17Mins 0 0 0 328 MSCF
3. Flare/Relief Valve 10:42 13:36 2Hrs 54Mins 0 0 0 11,882 MSCF
4. Controlled Blowdow 11:41 12:04 OHrs 23Mins 0 0 0 387 MSCF
5. Controlled Blowdow 13:40 13:55 OHrs 15Mins 0 0 0 328 MSCF
6. Flare/Relief Valve 19:00 19:25 OHrs . 25Mins 0 0 0 328 MSCF
7. Flare/Relief Valve 19:50 19:55 OHrs 5Mins 0 0 0 328 MSCF
8. Flare/Relief Valve 20:15 20:17 OHrs 2Mins 0 0 0 328 MSCF
TOTAL VOLUME 14,104 MSCF
First Determination of Cause:
1. Compressor 1801 shutdown on discharge temperature sensor failure (T 49)
2. Compressor 1855 shutdown on High High Suction Drum Level.
3. Loss of compressors 1805 (governor malfunction) and 1855 (high high suction drum level).
4. Compressor 1805 shutdown on Governor Malfunction
5. Shutdown compressor 1855 to troubleshoot governor problems.
6. Compressor 1855 shutdown on Governor Malfunction
7. Compressor 1855 shutdown on Governor Malfunction
8. Compressor 1855 shutdown on Governor Malfunction
Action Taken to Stop Flaring:
1. Replaced T 49 sensor and restarted compressor. MTR 618
Tuesday, September 23, 2003
Page 1 of 2
REPORT NO: 03-0516
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF
DATE: 09 Sep 2003
)... ~ Cleared high level and restarted compressor. MTR 618
3 }if:' Restarted and loaded compressor 1805. MTR 660
V- ~ Reset Governor Malfunction and restarted compressor. MTR 618
~ ~ No cause found, lift iln standby mode (compressor not needed. MTR 618
b 1,.0(" Reset Governor Malfunction and restarted compressor. MTR 618
1 ").K Reset Governor Malfunction and restarted compressor. MTR 618
g 1,Æ( Reset Governor Malfunction and restarted compressor. MTR 618
Tuesday, September 23,2003
Page 2 of 2
REPORT NO: 03-0525
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF
DATE: 15 Sep 2003
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
10:50 12:10 1 Hrs 20Mins ~ 0 ~ 3,111 MSCF
23:10 00:40 1 Hrs 30 Mins ~ 0 ~ 4,040 MSCF
TOTAL VOLUME 7;'151 MSCf
First Determination of Cause:
1. Blewdown L TS-3 from 500,psig íD repair Jeaks.
2. Blewdown L TS-3 from 650 psig to repair leaks.
Action Taken to Stop Flaring:
1. De-pressured tower and repaired leaking flanges. Reported flared volume on meter #618.
2. De-pressured tower. Reported flared volume on meter #618.
Tuesday, September 23,2003
Page 1 of 1
REPORT NO: 03-0532
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF
DATE: 17 Sep 2003
SYSTEM
1. Flare/Relief Valve
TIME OF FLARING
Start Stop Duration
23:45 24:00 OHrs 15Mins
First Determination of Cause:
1. Shutdown T /C 1886 & BESD; For Major Overhaul.
Meter # 618
Action Taken to Stop Flaring:
1. Blowdown Completed.
Tuesday, September 23, 2003
Black
Intermittent Smoke
o 0
Planned
TOTAL VOLUME
~
VOLUME
430 MSCF
430 MSCF
Page 1 of 1
REPORT NO: 03-0544
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF
DATE: 26 Sep 2003
SYSTEM
1. Flare/Relief Valve
TIME OF FLARING
Start Stop Duration
21 :29 21 :55 0 Hrs 26Mins
Black
Intermittent Smoke
Planned
o 0
~
VOt.1JME
95 MSCF
95 MSCF
TOTAL VOLUME
First Determination of Cause:
1. Gave Tandem #4 a Type "B" sid due to Instrumentation reasons",Train was only pressurized to
1700 psi.
Action Taken toStQP Flaring:
1. De-pressure completed.
Monday, September 29, 2003
Page 1 of 1
GPB Flaring Incident
Subject: GPB Flaring Incident
Date: Wed, 10 Sep 2003 19:11 :00 -0500
From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com>
To: steve _ mcmains@admin.state.ak.us
CC: "Fiedler, Anne M" <Fied1eAM@BP.com>, "Benson, Gary A" <BensonGA@BP.com>,
"Pfeiffer, Jim A" <PfeiffJA@BP.com>,
"GPB, Environ Advisor West" <GPB EnvironAdvi sorW est@BP . com>,
"GPB, Environ TL" <GPBEnvironTL@BP.com>,
"GPB, Environ Advisor East" <GPBEnvironAdvisorEast@BP.com>
To:
Steve McMains, AOGCC
steve mcmains@admin.state.ak.us
907-793-1241, fax 907-276-7542
>
>
>
>
>
>
From:
Michael Bolkovatz, GPB Prod Optim Team Leader, 907-659-5566
> An extended flare event occurred on September 9, 2003. CGF Booster
compressor 1801 shutdown due to a discharge temperature sensor failure. In
order to control the gas transit line pressure, CGF, FS1, GC1, and GC3
immediately started flaring while simultaneously reducing gas production by
550 MMSCFPD. Also, CGF lost both MI compressors as a result of Booster 1801
shutting down. Several attempts were required to restart the MI compressors.
The CGF Booster was down for 15 minutes, the MI machines were down
intermittently for 10 hrs and 21 minutes. Total CGF flare volume was 14,104
MSCF (10 hrs, 21 mins intermittent flare), FS1 flare volume was 13,153 MSCF
(1 hr, 5 mins), GC1 flare volume was 9,792 MSCF (47 minutes), and GC3 flare
volume was 845 MSCF (54 minutes) .
>
> If you require additional information, please don't hesitate to call
me.
>
>
>
>
>
>
>
Michael Bolkovatz
GPB Production Optimization TL
659-5566
",1 of 1
9/ll/2003 7:16 AM
-
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 10/2003
CENTRAL GAS FACILITY
Disposition Volume MCF*
1. Sold 2,610,540
2. Reinjected 10,585,874
3. Flared or vented less than 1 hour. 13,234
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 24,545
6. Used for lease operations Fuel 2,593,539
Assist 37,828
7. Other Lift Gas, Off Field 0
MI to GPMA 2,261,499
TOTAL items 1 - 7 18,127,059
8. NGL gas equivalent produced 2,610,540
9. Purchased gas 0
10. Transferred from: CCP 19,736,545
11. Transferred to: FS1, FS2, FS3 1,609,486
Remarks:
I hereby CeðfY G~t ;te foregoing is true and correct to the best of my knowledge.
Signature:. .Å A/vJ/Ja Title: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
October 2003
Page 1
IUnplanned Events less than or equal to 1 hour
DATE. . · . TIME, ' , . , , · VOLUME. DESCRIPTION OF INCIDENT & CAUSE'
10/4/2003 1525-1540 387 Not required for unplanned events which
10/4/2003 1530-1544 35 are less than or equal to 1 hour
10/14/2003 0840-0842 22
TOTAL
444
IUnplanned Events greater than 1 hour
DATE < TIME; '. VOLuMEDESCl:tlPTION OF INCIDENT & CAUSE
See attachments
TOTAL
o
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE '
10/12/2003 0009-0035 400 See attachments
10/1512003 1008-1023 430
10/15/2003 1008-1046 11 ,450
10/29/2003 0033-0110 255
10/29/2003 0146-0201 255
TOTAL
12,790
J
Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mct
, DATE TIME VOLUME PESCRIPTlON OF INCIDENT & CAUSE
See attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Plannect Events> 1 hour or
exceeding 5.000 MCF
Pilot Purge
Assist
o
12,790
o
TOTAL FLARED VOLUME
75.607
ACTION TAKEN TO EUMINATE CAUSE '
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE, · ,
See attachments
ACTION TAKEN TO EUMINATECAUSE
See attachments
ACTION TAKEN TO EUMINATE CAUSE
See attachments
11/7/2003
1:53PM
REPORT NO: 03-0578
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF
DATE: 12 Oct 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 00:09 00:35 0 Hrs 26Mins 0 0 ~ 400 MSCF
TOTAL VOLUME
400 MSCF
First Determination of Cause:
1. Planned shutdown of 1883
Action Taken to Stop Flaring:
1. completed venting of 1883 turbine compressor. MTR#618
Tuesday, October 21, 2003
Page 1 of 1
REPORT NO: 03-0582
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF DATE: 15 Oct 2003
TIME OF FLARING
SYSTEM Start Stop Duration Intermittent
1. Flare/Relief Valve 10:08 10:23 0 Hrs 15 Mins 0
2. Flare/Relief Valve 10:08 10:46 0 Hrs 38 Mins 0
Black
Smoke Planned VOLUME
0 ~ 430 MSCF
0 ~ 11 ,450 MSCF
TOTAL VOLUME 11 ,880 MSCF
First Determination of Cause:
1. T /C 1886 "C" computer failure caused a BESD.
Meter #618
2. T/C 1886 Shutdown to repair "C" computer; Mark 4 Turbine control failure. Meter #664
Note Volume was calculated from 01 F2151
Action Taken to Stop Flaring:
1. Blowdown Completed
2. EOC Cut gas to stop flaring.
Tuesday, October 21, 2003
Page 1 of 1
REPORT NO: 03-0601
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF
DATE: 29 Oct 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Controlled Blowdow 00:33 01: 1 0 0 Hrs 37 Mins 0 0 ~ 255 MSCF
TOTAL VOLUME
255 MSCF
First Determination of Cause:
1. Control modifications to T/C 1801 Mark VI Controls. Shut down turbine and depressured
compressor.
Action Taken to Stop Flaring:
1. Completed depressurization.
Thursday, October 30, 2003
Page 1 of 1
REPORT NO: 03-0602
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF
DATE: 29 Oct 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Controlled Bowdow 01 :46 02:01 0 Hrs 15 Mins 0 0 ~ 255 MSCF
TOTAL VOLUME
255 MSCF
First Determination of Cause:
1. Control modifications to T /C 1802 Mark VI controls. Shut down turbine and depressured
compressor.
Action Taken to Stop Flaring:
1. Completed depressurization.
Thursday, October 30, 2003
Page 1 of 1
·
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) MonthNear of Disposition
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 11/2003
CENTRAL GAS FACILITY
Disposition Volume MCF*
1. Sold 2,587,458
2. Reinjected 9,648,855
3. Flared or vented less than 1 hour. 2,147
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 24,975
6. Used for lease operations Fuel 3,204,848
Assist 36,560
7. Other Lift Gas, Off Field 0
MI to GPMA 2,158,159
TOTAL items 1 - 7 17,663,002
8. NGL gas equivalent produced 2,587,458
9. Purchased gas 0
10. Transferred from: CCP 19,296,983
11. Transferred to: FS1, FS2, FS3 1,633,981
Remarks:
I hereby ce(.J,(5t t~re~s true and correct to the best of my knowledge.
Signature:' Å.11 Title: SUPERVISOR
,
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
..
.;
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
November 2003
lunplanned Events less than or equal to 1 hour
',' ,DATE ".' '" TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
11/6/2003 1335-1350 195 Not required for unplanned events which
11/6/2003 1929-1944 195 are less than or equal to 1 hour
11/8/2003 1500-1530 195
11/27/20031055-1125 1,562
Page 1
TOTAL
2,147
lunplanned Events greater than 1 hour
DATE, ' TIME' , , VOLUME ,. ,DIESCRIPTlON OF INC,IDENT & CAUSE
See attachments
TOTAL
o
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
,DATE "'., TIME ,. VOLUME DESCRIPTION 01=' INCIDENT & CAUSE
See attachments
TOTAL
o
~Planned Events Exceeding 1 Hour OR Exceeding 5000 Mct
"DATE " TIME, VOLUME, DESCRIPTION ,OF INCIDENT & CAUSE
See attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5.000 MCF
Pilot Purge
Assist
o
o
o
TOTAL FLARED VOLUME
63,682
ACTION TAKEN TO EUMINATE CAUSE,
Not required for unplanned events which
are less than or equal to 1 hour
,ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO EUMINAtE CAUSE,
See attachments
ACTION TAKEN TO ELIMINATE CAUSE ,
See attachments
12/5/2003
10.21 AM
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 12/2003
CENTRAL GAS FACILITY
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
'2L¡ð~"Z.·_MCF 3&a-
Disposition Volume MCF*
1. Sold 2,934,132
2. Reinjected 10,945,657
3. Flared or vented less than 1 hour. 1,224
4. Flared or vented greater than 1 hour 22,882
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 25,554
6. Used for lease operations Fuel 3,467,721
Assist 39,849
7. Other Lift Gas, Off Field 0
MI to GPMA 2,199,238
TOTAL items 1 - 7 19,636,257
8. NGL gas equivalent produced 2,934,132
9. Purchased gas 0
10. Transferred from: CCP 21,346,857
11. Transferred to: FS1, FS2, FS3 1,710,600
Remarks:
I hereby cet) Q th[ foregoing 0 true and correct to the best of my knowledge.
Signature: . Á J\ .N\ I' Title: SUPERVISOR
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
December 2003
Page 1
Unplanned Events less than or equal to 1 hour
12/4/2003
12/5/2003
12/24/2003
0830-0850
1000-1016
0718-0724
TOTAL
387 Not required for unplanned events which
774 are less than or equal to 1 hour
63
Not required for unplanned events which
are less than or equal to 1 hour
1,224
Unplanned Events greater than 1 hour
12/4/2003
12/5/2003
0630-1015
0955-1135
TOTAL
1,337 See attachments
21,545
See attachments
22,882
Planned Events Less Than or Equal 1 Hour AND Not Exceedin 5000 Met
TOTAL
See attachments
See attachments
o
Planned Events Exceeding 1 Hour OR Exceedin 5000 Met
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
See attachments
See attachments
o
1,224
22,882
o
o
89,509
1/6/2004
3:42 PM
REPORT NO: 03-0654
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF
DATE: 04 Dee 2003
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
06:30 10:15 3Hrs 45Mins 0 0 0 1,387, MSGF
08:30 08:50 OHrs 20Mins 0 0 0 387 MSCF
TOTAL VOLUME 1 ,724 MSCF
First Determination of Cause:
1. M I 1855 upset'ami'shutdown'due"to-a,1aiIed'moore::ca:nhin.the gas generator speed controffs Ftared
MI through the 431 Stabilizer over head vent10 flare.
2. Shutdown and depressrued 1855 MI compressortórêpairfailed moore card.
Action Taken to Stop Flaring:
1. Replaced moore card and restarted the compressor
Meter 660
2. Compressor bled down to zero PSI.
Emergency Est. meter 618
Thursday, December 18, 2003
Page 1 of 1
REPORT NO: 03-0657
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF
DATE: 05 Dee 2003
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke
09:55 11 :35 1 Hrs 40Mins 0 0
10:00 10:16 OHrs 16Mins 0 0
Planned VOLUME
o 21,545.,MSCF
o 774 MSCF
TOTAL VOLUME 22,319 MSCF
First Determination of Cause:
1. Both 1805 and 1855 MI compressors shut down due to HP Fuel gas low pressure which-was"8'fesult
of 1801 and 1802 Booster compressors going to cool stop. This was caused by instrumentation
working in the panel.
2. Both MI Compressors shutdown and depressuTed to the flare due to the HP Fuel Gas system HI
pressure.OSQ"thathappened.whenthe:boostersgojog to cool stop while instrumentation was
working in the panel.
Action Taken to Stop Flaring:
1. Restarted both 1805 and 1855 M I Compressors.
METER 660
~~
~~
~<
-~
~tS
" 0Þ-5
. ~",,(Q /~
~~~
-~
~ù:s
? off
2. Compressors depressured to zero PSI
METER 618
Thursday, December 18, 2003
Page 1 of 1