STATE OF AlASKA
AOGCC
GAS DISPOSITION FILES
YEAR: 2003
FACILITY: PBU GC 1
OPERATOR: BP EXPLORATION
(AlASKA) INC
GATHERING CENTER 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) IMonthNear of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 01/2003
Facility
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 12,286
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 37,360
6. Used for lease operations Fuel 983,435
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 1,033,081
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 71,152,270
Remarks:
I hereby ceO' that t"fOregOino ,is true and correct to the best of my knowledge.
Signature: (\ . .A A - J J Title: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 MC 25.235.
1/2/2003
1/9/2003
1/11/2003
1/12/2003
1/13/2003
1/13/2003
1/14/2003
1/14/2003
1/15/2003
1/18/2003
1/19/2003
1/21/2003
1/22/2003
1/25/2003
1/26/2003
1/26/2003
1/26/2003
1/26/2003
1/26/2003
1/26/2003
1/26/2003
1/27/2003
1/27/2003
1/27/2003
1/28/2003
1/29/2003
1/30/2002
1/31/2003
1/31/2003
0059-0104
1551-1600
0553-0602
1429-1439
1548-1600
2136-2143
1421-1428
2338-2344
1916-1928
0635-0642
0944-0955
0126-0134
0133+0154
0504-0513
0400-0410
0515-0525
0721-0728
0925-0934
0936-0942
1730-1740
1825-1835
0010-0020
0755-0818
2323-2338
1019-1026
0930-0936
1633-1640
2151-2158
2257-2324
TOTAL
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS FLARING INCIDENT REPORT
January 2003
52 are less than or equal to 1 hour
156
156
173
208
68
122
104
150
49
76
100
510
229
694
694
486
625
417
694
694
694
1,597
313
486
417
486
481
938
12,286
Page 1
are less than or equal to 1 hour
IUnplanned Events greater than 1 hour
DATE TIME VOI;UME DESCRIPTION OF !NCIDEN! a CAUSE
See attachments
TOTAL
o
ACTION TAKEN TO EUMINATE CAUSE
See aUachments
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Met
DArE TIME .. VOI;UME DESCRIPTIQN.oF INCIDENT a CAUse
See aUachments
TOTAL 0
TOTAL
1 Hour OR Exceedin 5000 Met
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
49,646
o
o
ACTION TAKEN TQ EUMINATE CAUSE
See attachments
2/7/2003
9:25 AM
GATHERING CENTER 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
loperator Field(s) MonthNear of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 02/2003
Facility
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
1, Sold
o
Pool Name
Code
Percent
2. Reinjected
o
PRUDHOE
640150
100.00%
3. Flared or vented less than 1 hour.
10,244
4. Flared or vented greater than 1 hour
(Supplemental report re uired - See 20 AAC 25.235)
2,569
5. Pilot and Purge
33,740
6. Used for lease operations
Fuel
Assist
910,417
o
7. Other
Lift Gas, Off Field
o
TOTAL items 1 - 7
956,970
1. Safety
?t S'b <1 MCF -.:ß;e-.
8. NGL gas equivalent produced
o
2. Lease Use
MCF
9. Purchased gas
o
3. Conserv. Purposes
MCF
10. Transferred from:
o
/~) ~~~
ff/r~J
.
Commissioner
Date
11. Transferred to: CCP
65,508,805
Signature:
Form 10-422 (Revised 4/95)
true and correct to the best of my knowledge.
Title: SUPERVISOR
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25,235.
Remarks:
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT· GC-1
GAS FLARING INCIDENT REPORT
February 2003
Page 1
~Unplanned Events less than .or equal t.o 1 h.our
DATE TIME VOI..UME DESCRJPTIONOFiINCIDENT&CAUSE
2/1/2003 0846-0854 556 Not required for unplanned events which
2/1/2003 1627-1628 0 are less than or equal to 1 hour
2/1/2003 1645-1652 486
2/2/2003 2337-2358 1,094
2/3/2003 0824-0831 486
2/3/2003 1704-1710 417
2/4/2003 0004-0015 573
2/4/2003 0030-0037 486
2/4/2003 2045-2100 781
2/10/2003 2008-2022 292
2/12/2003 0733-0740 486
2/13/2003 2245-2320 122
2/13/2003 23º-0-2359 4,097
2/19/2003 2323-2330 243
2/28/2003 0420-0432 125
TOTAL
10,244
~Unplanned Events ~reater than 1 h.our
DATE TIME VOI..UME DESCRIPTION OF INCfDENT& CAUSE
2/14/2003 0001-0115 2,569 See attachments
TOTAL
2,569
~Planned Events Less Than .or Equal 1 Hour AND N.ot Exceeding 5000 Met
DAtE tiME VOLUME DESCRIPtlöN öFII'lCIDEl'lt & CAuse
See attachments
TOTAL 0
~Planned Events Exceeding 1 Hour OR Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL 0
TOTAL
10,244
2,569
o
ACTION TAKEN TO eLIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
o
TOTAL FLARED VOLUME
46,553
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
3/7/2003
3;33 PM
REPORT NO: 03-0088
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC1
DATE: 14 Feb 2003
SYSTEM
1. Flare/Relief Valve
TIME OF FLARING
Start Stop Duration
00:01 01:15 1 Hrs 14Mins
Black
Intermittent Smoke
o 0
Planned VOLUME
o 2,569 MSCF
TOTAL VOLUME 2,569 MSCF
First Determination of Cause:
1. Data highway errors, K-700 and K-7001 shutdown.
Action Taken to Stop Flaring:
1. All LP production, shut-in. K-7000 restarted. Flaring stopped.
Monday, February 24, 2003
Page 1 of 1
GPB Flaring Incidents
Subject: GPB Flaring Incidents
Date: Mon, 17 Feb 2003 13:36:11 -0600
From: "Tucker, Hal E" <TuckerHE@BP.com>
To: steve _ mcmains@admin.state.ak.us
CC: "Fiedler, Anne M" <FiedleAM@BP.com>, "Benson, Gary A" <BensonGA@BP.com>,
"Pfeiffer, Jim A" <PfeiffJA@BP.com>,
"GPB, Environ Advisor West" <GPBEnvironAdvisorWest@BP.com>,
"GPB, Environ TL" <GPBEnvironTL@BP.com>,
"GPB, Environ Advisor East" <GPBEnvironAdvisorEast@BP.com>,
"GPB, CGF Ops Lead" <GPBCGFOpsLead@BP.com>
>
>
steve mcmains@admin.state.ak.us
>
907-276-7542
To:
Steve McMains, AOGCC
907-793-1241, fax
>
>
Leader, 907-659-4472
>
> An extended flare incident occurred at GC-1
on February 13 - 14 , 2003. Data highway errors on the backup data highway
caused both LPS compressors to shut down instantaneously. The flaring event
began at 22:45 on 2/13 and ended at 01:15 on 2/14. This is broken into 2
flare reports to accomodate database limitations, but was one, continuous
event. All LP production was choked to minimum to reduce flaring, however
due to the -37 deg ambient, production was not shut completely in, to keep
fluids moving in the LDF's. Total flare time was 2 hours and 29 minutes.
Total flare volume was 6,788 MSCF.
From:
Hal Tucker, GPB Prod Optim Team
>
> If you require additional information,
please don't hesitate to call me.
>
>
>
>
>
>
Hal Tucker
GPB Production Optimization TL
659-4472, 659-5566
GPB Flaring Incidents
Subj.:,GPB llarmg'lDeideBu
Date: Thu, 13 Feb 2003 13:47:35 -0600
From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com>
To: steve _ mcmains@admin.state.ak.us
CC: "Fiedler, Anne M" <FiedleAM@BP.com>, "Benson, Gary A" <BensonGA@BP.com>,
"Pfeiffer, Jim A" <PfeiffJA@BP.com>,
"GPB, Environ Advisor West" <GPBEnvironAdvisorW est@BP .com>,
"GPB, Environ TL" <GPBEnvironTL@BP.com>,
"GPB, Environ Advisor East" <GPBEnvironAdvisorEast@BP.com>,
"GPB, Prod Opt TL" <GPBProdOptTL@BP.com>,
"GPB, CGF Ops Lead" <GPBCGFOpsLead@BP.com>
>
>
steve mcmains@admin.state.ak.us
>
907-276-7542
To:
Steve McMains, AOGCC
907-793-1241, fax
>
>
Leader, 907-659-4472
>
From:
Hal Tucker, GPB Prod Optim Team
An extended flare incident occurred
on February 11, 2003, during performance testing of the recently overhauled
MI turbine 19-1855. Performance testing was required to collect data for
engineering calculations of maximum firing temperatures. The appropriate
data was successfully acquired. During the testing MI 19-1855 shut down 4
times due to process stability problems. Total flare time was 9 hours and 8
minutes. Total flare volume was 29, 281 MSCF.
> If you require additional information,
please don't hesitate to call me.
>
Hal Tucker
GPB production Optimization TL
659-4472, 659-5566
GATHERING CENTER 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s MonthNear of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 03/2003
Facility
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
1. Sold
o
Pool Name
Code Percent
2. Reinjected
o
PRUDHOE
640150 100.00%
3. Flared or vented less than 1 hour.
8,985
1,250
5. Pilot and Purge
37,354
6. Used for lease operations
Fuel
Assist
997,746
o
7. Other
Lift Gas, Off Field
o
TOTAL items 1 -7
1,045,335
1. Safety
I, z5D MCF (]13P--
8. NGL gas equivalent produced
o
2. Lease Use
MCF
9. Purchased gas
,
o
3. Conserv. Purposes
MCF
10. Transferred from:
o
~L4~
Commissioner
sjS(03
Date
11. Transferred to: CCP
73,278,328
I hereby ce
Signature:
Form 10-422 (Revised 4/95)
is true and correct to the best of my knowledge.
Title: SUPERVISOR
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 MC 25.235.
Remarks:
BP EXPI..ORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS Fl..ARING INCIDENT REPORT
March 2003
Page 1
'unplanned Events less than .or equal t.o 1 h.our
DATE TIME VOLUME DESCRIPTION OF INCIDENT &.CAUSE
3/3/2003 0309-0316 146 Not required for unplanned events which
3/3/2003 0329-0405 250 are less than or equal to 1 hour
3/3/2003 1453-1459 25
3/4/2003 0843-0849 167
3/6/2003 1624-1655 431
3/18/2003 0527-0549 764
3/18/2003 0907-0937 6,250
3/23/2003 1209-1215 208
3/26/2003 1339-1342 21
3/28/2003 1133-1152 330
3/28/2003 2133-2142 81
3/30/2003 1441-1454 135
3/30/2003 1229-1246 177
TOTAL
8,985
'unplanned Events greater than 1 h.our
DATE TIME VOI..UME DESCRIPTION OF INCIDENT & CAUSE
3/6/2003 1145-1247 1 ,250 See attachments
TOTAL
1,250
'Planned Events Less Than .or Equal 1 H.our AND N.ot Exceeding 5000 Mcf
DATE TIME VOI..UME DESCRIPTION·OFINCIDENT&CÄUSE
See attachments
TOTAL 0
~Planned Events Exceeding 1 H.our OR Exceeding 5000 Mcf t
DATE TIME VOI..UME DESCRIPTIONOFINCIDENT&CAUSE
See attachments
TOTAL 0
ACTION TAKEN TO·EI..IMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION .TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FI..ARED VOLUME
TOTAL
8,985
1,250
o
o
47,589
ACTION TAKEN TO EI..IMINATE CAUSE
See attachments
4/8/2003
11:26AM
REPORT NO: 03-0117
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC1
DATE: 06 Mar 2003
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
11:45 12:47 1Hrs 2Mins 0 0 0 1 ,250 MSCF
16:24 16:55 OHrs 31 Mins 0 0 0 431 MSCF
TOTAL VOLUME 1,681 MSCF
First Determination of Cause:
1. High gas transit line pressure caused by CGF compressor 1801 shut down due to bad RTD card that
signaled a false high bearing temperature SID.
2. High gas transit line pressure caused by CGF compressor 1801 shut down due to bad RTD card that
signaled a false high bearing temperature SID.
Action Taken to Stop Flaring:.
1. WOA reduced production rates and shut-in 30 wells equaling 500 mmscfd. EOA reduced production
rates and shut-in 18 wells equaling 500 mmscfd. Wells were shut-in or choked back starting at 1143
hours.
2. WOA stopped bringing up rates and cut back to previous 500 mmcf rate cut.
Monday, March 31, 2003
Page 1 of 1
GPB Flaring Incidents
Subject: GPB Flaring Incidents
Date: Sun, 9 Mar 2003 13:12:12 -0600
From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com>
To: steve _ mcmains@admin.state.ak.us
CC: "Fiedler, Anne M" <FiedleAM@BP.com>, "Benson, Gary A" <BensonGA@BP.com>,
"Pfeiffer, Jim A" <PfeiffJA@BP.com>,
"GPB, Environ Advisor West" <GPBEnvironAdvisorWest@BP.com>,
"GPB, Environ TL" <GPBEnvironTL@BP.com>,
"GPB, Environ Advisor East" <GPBEnvironAdvisorEast@BP.com>
To: Steve McMains, AOGCC
steve mcmains@admin.state.ak.us
907-793-1241, fax
907-276-7542
From:
Hal Tucker, GPB Prod Optim
Team Leader, 907-659-4472
An extended flare incident occurred
on March 6, 2003 at GPB WOA. CGF booster 1801 shut down on a false high
bearing temperature reading. This requires cutting 800 MMSCFD to get out of
flare. Gas cuts began immediately upon losing 1801, with all 3 GC's out of
flare at just over an hour after flaring began. WOA cut 500 MMSCFD and EOA
cut an additional 500 MMSCFD.
and 3 are as follows:
Final flaring results for GC's 1, 2,
GC1 62 minutes 1250
GC2 62 minutes 861
GC3 60 minutes 1667
MSCF
MSCF
MSCF
Total flare volume 3778
MSCF
If you require additional
information, please don't hesitate to call me.
Hal Tucker
GPB production Optimization TL
659-4472, 659-5566
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) MonthNear of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 04/2003
GATHERING CENTER 1
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 22,274
4, Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 35,450
6. Used for lease operations Fuel 909,383
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 967,107
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 67,053,442
Remarks:
I hereby cefj/hat r::foregoffg is true and correct to the best of my knowledge.
Signature: IQ I '"". 1 J Title: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100,00%
1, Safety
MCF
2. Lease Use
MCF
3. Conserv, Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14,65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235,
BP EXPI..ORATION (ALASKA) INC.
PRUDHOE BAY UNIT· GC-1
GAS Fl..ARING INCIDENT REPORT
April 2003
Page 1
~Unplanned Events less than or equal to 1 hour
DATE TIME YOLUMEDESCRIPTIONOF'INCIDENT&CAUSE
4/3/2003 0515-0548 160 Not required for unplanned events which
4/4/2004 1925-2013 1,033 are less than or equal to 1 hour
4/4/2003 2229-2241 225
4/5/2003 1230-1235 17
4/6/2003 1222-1228 417
4/6/2003 1929-1940 764
418/2003 1626-1643 130
4/9/2003 1639-1645 208
4/10/2003 1244-1250 208
4/10/2003 1340-1346 208
4/10/2003 1602-1608 208
4/10/2003 1727-1802 2,431
4/11/2003 2205-2210 347
4/12/2003 2133-2139 417
4/14/2003 1428-1434 208
4/14/2003 2058-2108 694
4/14/2003 2301-2307 417
4/15/2003 0012-0024 833
4/15/2003 0552-0606 486
4/15/2003 1024-1030 208
4/15/2003 1559-1604 90
4/15/2003 2220-2232 833
4/16/2003 0210-0216 208
4/16/2003 0335-0341 208
4/16/2003 0453-0459 208
4/16/2003 0655-0701 208
4/16/2003 2200-2218 1 ,250
4/17/2003 1340-1422 694
4/17/2003 1511-1522 344
4/17/2003 1542-1600 556
4/18/2003 1537-1654 1,667 Intermittent, 48 minutes
4/18/2003 1751-1820 2,014
4/19/2003 1621-1627 208
4/20/2003 1800-1822 1,528
4/22/2003 2220-2225 347
4/22/2003 231 0-2316 417
4/23/2003 0020-0025 347
4/23/2003 1208-1218 139
4/26/2003 1058-1105 486
4/26/2003 1901-1908 486
4/28/2003 0638-0644 417
TOTAL
22,274
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
5/7/2003
3:47 PM
BP EXPI..ORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS Fl..ARING INCIDENT REPORT
April 2003
Page 2
¡unplanned Events greater than 1 h.our
DATE TIME VOLUME
DESCRIPTION OF INCIDENT & CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
TOTAL
o
¡Planned Events Less Than .or Equal 1 Hour AND N.ot Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL 0
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
~Planned Events Exceeding 1 H.our OR Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL 0
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
22,274
o
o
o
TOTAL FI..ARED VOLUME
57,724
5/7/2003
3:47 PM
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) MonthNear of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU OS/2003
GATHERING CENTER 1
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 9,208
4. Flared or vented greater than 1 hour 1,069
(Supplemental report required - See 20 AAC 25.235)
5, Pilot and Purge 37,862
6. Used for lease operations Fuel 985,489
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 1,033,628
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 68,529,621
Remarks:
I hereby ce~ that tt fOregO~ is true and correct to the best of my knowledge.
Signature: I\. ..Å.A d 11 Title: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
JObCJ MCF ~.R-
2. Lease Use
MCF
3, Conserv. Purposes
MCF
7;]1!--"3
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPI..ORATION (AI..ASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS FLARING INCIDENT REPORT
May 2003
Page 1
IUn~lannedEvents less than .or equal t.o 1 h.our
DATE TIME VOL.t.lME DESCAIPtIONO.FIIIICIDENTS(CAOSE
5/3/2003 0032-0040 556 Not required for unplanned events which
5/8/2003 2327-2334 53 are less than or equal to 1 hour
5/9/2003 0543-0610 375
5/9/2003 1256-1302 42
5/9/2003 1558-1620 306
5/10/2003 0906-0922 222
5/10/2003 1957-2011 136
5/11/2003 1154-1159 35
5/12/2003 1750-1755 49
5/17/2003 0304-0327 192
5/17/2003 0455-0503 83
5/17/2003 0541-0547 20
/17/2 3 0728-0821 920
517/2003 -083 350
5/17/2003 1600-1617 590
5/18/2003 0620-0641 115
5/20/2003 0307-0400 552
5/20/2003 2244-2250 67
5/21/2003 0142-0146 39
5/21/2003 0838-0844 1 00
5/2 3 0858-0904 208
5/21/2003 0910-1020 3,125 Intermittent - 45 minutes
2/200 5 -
5/31/2003 1521-1544
TOTAL
399
9,208
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
lunplanned Events ~reater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
5/9/2003 0222-0343 1,069 See attachments
TOTAL
1,069
~Planned Events Less Than .or Equal 1 H.our AND N.ot Exeeedin~ 5000 Mef
DATE TIME VOI..UME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL 0
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO EL.IMINATE CAUSE
See attachments
6/9/2003
11:36AM
BP EXPI..ORATION (AI..ASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS Fl..ARING INCIDENT REPORT
May 2003
Page 2
¡Planned Events Exceeding 1 H.our OR Exceeding 5000 Mcf
DATE TIME VOI..UME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL 0
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
1,069
o
o
TOTAL FLARED VOI..UME
48,139
6/9/2003
11:36AM
REPORT NO: 03-0283
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC1 DATE: 09 May 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 02:22 03:43 1 Hrs 21 Mins 0 0 0 1,069 MSCF
2. Flare/Relief Valve 05:43 06:10 OHrs 27 Mins 0 0 0 375 MSCF
3. Flare/Relief Valve 12:56 13:02 OHrs 6Mins 0 0 0 42 MSCF
4. Flare/Relief Valve 15:58 16:20 OHrs 22 Mins 0 0 0 306 MSCF
TOTAL VOLUME 1,792 MSCF
First Determination of Cause:
1. High gas transit line pressure caused by CCP compressor problems due to adjusting field line up for
fuel gas supply pressure.
2. High gas transit line pressure caused by CCP compressor problems due to 1808 re-cycle problem.
3. High ambient temperature swings resulted in flaring and required cuts in production. Ambient
temperature increased by rF.
4. High ambient temperature swings resulted in flaring and required cuts in production. Ambient
temperature increased by 3°F.
Action Taken to Stop Flaring:
1. WOA reduced production rates and shut-in 36 wells equaling 320 mmscfd. Wells were shut-in or
choked back starting at 0222 hours.
2. WOA reduced production rates and shut-in wells equaling 94 mmscfd. Wells were shut-in or choked
back starting at 05:43.
3. WOA reduced production rates and shut-in wells equaling 24 mmscfd. Wells were shut-in or choked
back starting at 12:56.
4. WOA reduced production rates and shut-in wells equaling 90 mmscfd. Wells were shut-in or choked
back starting at 15:58.
Friday, May 23, 2003
Page 1 of 1
bp
REPORT NO: 03-0311
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC1 DATE: 17 May 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 03:04 03:27 o Hrs 23Mins ~ 0 0 192 MSCF
2. Flare/Relief Valve 04:55 05:03 OHrs 8Mins 0 0 0 83 MSCF
3. Flare/Relief Valve 05:41 05:47 OHrs 6Mins 0 0 0 208 MSCF
4. Flare/Relief Valve 07:28 08:21 o Hrs 53 Mins 0 0 0 920 MSCF
5. Flare/Relief Valve 08:26 08:36 o Hrs 10 Mins 0 0 0 350 MSCF
6. Flare/Relief Valve 16:00 16:17 OHrs 17 Mins 0 0 0 590 MSCF
TOTAL VOLUME 2,343 MSCF
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient
temperature limited the performance of the LPS turbines causing the slugcatchers to flare.
2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient
temperature limited the performance of the LPS turbines causing the slugcatchers to flare.
3. The Carry Over Prevention System initiated LPS flare valve opening to prevent contactor
floodinglTEG carryover due to high contactor differential pressure.
4. High ambient temperature swings resulted in flaring and required cuts in production. Ambient
temperature limited the performance of the LPS turbines causing the slugcatchers to flare.
5. The Carry Over Prevention System initiated LPS flare valve opening to prevent contactor
floodinglTEG carryover due to high contactor differential pressure. Large rate cut to stop flaring
caused large pressure drop in transit line
6. The Carry Over Prevention System initiated LPS flare valve opening to prevent contactor
foodinglTEG carryover due to high contactor differential pressure.
Action Taken to Stop Flaring:
1. WOA reduced production rates and shut-in 4 wells equaling 52 mmscfd. Wells were shut-in or
choked back starting at 0304 hours.
Friday, May 23, 2003
Page 1 of 2
bp
REPORT NO: 03-0311
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC1
DATE: 17 May 2003
:l. / WOA reduced production rates and shut-in 4 wells equaling 52 mmscfd. Wells were shut-in or
choked back starting at 0455 hours.
) ¡f. Wells unloaded and flaring was ceased.
'-t Vf. WOA reduced production rates equaling 170 mmscfd. Wells were shut-in or choked back starting at
0730 hours.
~ y( Wells unloaded and flaring was ceased.
b J.i Wells unloaded and flaring was ceased.
Friday, May 23, 2003
Page 2 of 2
bp
REPORT NO: 03-0330
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC1 DATE: 21 May 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 01:42 01:46 o Hrs 4Mins D D C 39 MSCF
2. Flare/Relief Valve 08:38 08:44 OHrs 6Mins D D C 100 MSCF
3. Flare/Relief Valve 08:58 09:04 OHrs 6Mins D D C 208 MSCF
4. Flare/Relief Valve 09:10 10:20 o Hrs 45Mins ~ D C 3,125 MSCF
TOTAL VOLUME 3,472 MSCF
First Determination of Cause:
1. While unloading a well to the LP system after a logging job the slugcatchers went to flare.
2. While unloading a well while logging, LPS compressors exceeded maximum gas capacity and
discharged to flare.
3. The Carry Over Prevention System initiated LPS flare valve opening to prevent contactor
fJooding/TEG carryover when gas rates exceeded the 1140 mmscfd operability limit.
4. The Carry Over Prevention System initiated LPS flare valve opening to prevent contactor
flooding/TEG carryover when gas rates exceeded the high OP across Odd contactor limit.
Action Taken to Stop Flaring:
1. Moved well number 0-30 to the HP system at 0142hrs.
2. Switched well back to HP
3. WOA well unloaded and flaring was ceased.
4. Reduced gas rate, which lowered OP across contactor.
Friday, May 23, 2003
Page 1 of 1
GATHERING CENTER 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 06/2003
Facility
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
1. Sold
o
Pool Name
Code
Percent
2. Reinjected
o
PRUDHOE
640150
100,00%
3. Flared or vented less than 1 hour.
8,171
/
4, Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
12,535
-
5. Pilot and Purge
36,152
6, Used for lease operations
Fuel
Assist
871,616
o
7. Other
Lift Gas, Off Field
o
-.-. . .. _. .
. ,
> 1 nr.
TOTAL items 1 - 7
928,474
1. Safety
lZ( <;'35 MCF 55J?-'
8. NGL gas equivalent produced
o
2. Lease Use
MCF
o
3. Conserv. Purposes
~ ...-
W~~
Commissioner /
MCF
9. Purchased gas
o
10. Transferred from:
lß/ /3
D~t'
11. Transferred to: CCP
63,820,984
Remarks:
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
I hereby ce~ ~t t~e foregoi~ is true and correct to the best of my knowledge.
Signature: \) 1 J. ^-. .Å. A ",,)i 11 Title: SUPERVISOR
Form 1 0-422 (Revised 4/95)
BP EXPI..ORATION (AI..ASKA) INC.
PRUDHOE BAY UNIT· GC-1
GAS FI..ARING INCIDENT REPORT
June 2003
Page 1
~Un)lanned Events less than .or equal t.o 1 hour
DATE TIME VOI..UMEDESCRIP1'ION:OFINCIOENT&CAOSE
6/1/2003 0350-0401 92 Not required for unplanned events which
6/1/2003 0840-0858 250 are less than or equal to 1 hour
6/5/2003 1216-1223 243
6/7/2003 1555-1606 382
6/8/2003 2029-2037 111
6/9/2003 1812-1841 3,021
6/11/2003 0530-0556 1,632
6/12/2003 1218-1223 175
6/12/2003 1440-1445 175
6/16/2003 2155-2220 1,736
6/20/2003 1110-1116 146
6/30/2003 2114-2120 208
TOTAL
8,171
IUnplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
6/9/2003 0828-0933 11,285 See attachments
6/30/2003 2115-2230 1,250
TOTAL 12,535
~Planned Events Less Than .or Equal 1 H.our AND Not Exceedin~ 5000 Mcf
DATE TIME VOI..UME DESCRIPTIOIII OF INCIDENT & CAUSE
See attachments
TOTAL 0
Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL 0
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
12,535
o
o
TOTAl.. FLARED VOLUME
56,858
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEIII TO EI..IMIIIIATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
7/9/2003
1:59PM
FACILITY: GC1
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
REPORT NO: 03-0403
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 30 Jun 2003
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
21:14 21:20 OHrs 6Mins 0 0 0 208 MSCF
21:15 22:30 1 Hrs 15 Mins 0 0 0 1 ,250 MSCF
TOTAL VOLUME 1 ,458 MSCF
First Determination of Cause:
1. The Carry Over Prevention System initiated LPS flare valve opening to prevent contactor
floodingfTEG carryover when gas rates exceeded the 1140 mmscfd operability limit.
2. Sk-18 LP compressor lost suction because of a problem associated with high ambient temperature
and changing rate. Assist gas was used to prevent black smoke.
Action Taken to Stop Flaring:
1. WOA reduced production rates equaling 20 mmscfd. Wells were choked back starting at 2115
hours.
2. Inspected separators to check for possible blow-by from second stage. Reloaded compressor after
several tries.
Tuesday, July 01, 2003
Page 1 of 1
»I~
~J:fo
O~~
~
REPORT NO: 03-0371
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC1
DATE: 09 Jun 2003
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
08:28 09:33 1 Hrs 5Mins 0 0 0 11,285 MSCF
18:12 18:41 OHrs 29 Mins 0 0 0 3,021 MSCF
TOTAL VOLUME 14,306 MSCF
First Determination of Cause:
1. High gas transit line pressure caused by CGF compressor problems due to Booster compressor
1802 shutdown.
2. Due to CGF compressor problem, gas transit line pressured up, Annex wet gas flare valve to
300mmscfpd flare rate.
Action Taken to Stop Flaring:
1. WOA reduced production rates and shut-in 16 wells equaling 256 mmscfd. Wells were shut-in or
choked back starting at 08:31 hours.
2. Reduced chokes on 14 wells to minimum, equal to 300mmscfpd gas rate, flaring stopped.
Thursday, June 26, 2003
Page 1 of 1
Ld.B t'Janng Incident
Subject: GPB Flaring Incident
Date: Tue, 1 Jul2003 19:22:00 -0500
From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com>
To: steve _ mcmains@admin.state.ak.us
CC: "Fiedler, Anne Mil <FiedleAM@BP.com>, "Benson, Gary A" <BensonGA@BP.com>,
"Pfeiffer, Jim A" <PfeiffJA@BP.com>,
"GPB, Environ Advisor West" <GPBEnvironAdvisorWest@BP.com>,
"GPB, Environ TL" <GPBEnvironTL@BP.com>,
"GPB, Environ Advisor East" <GPBEnvironAdvisorEast@BP.com>
To:
Steve McMains, AOGCC
steve mcmains@admin.state.ak.us
907-793-1241, fax 907-276-7542
From:
Hal Tucker, GPB Prod Optim Team Leader, 907-659-4472
An extended flare event occurred on June 30, 2003 at GC1. The Carry
OVer Protection System initiated flaring off the slug catchers when the
pressure drop across the TEG/gas contactor exceeded the operability limit.
20 MMSCFD of gas was cut, closing the slug catcher flare valves within 6
minutes. The combination of high ambient temperature and rate change caused
the skid 18 LP compressor to lose suction and shut down. Several attempts
were required to restart the LP compressor resulting in a 1 hour and 15
minute flare event. Assist gas was added to the LP gas to avoid black smoke.
Total flare volume for the 1 hour event was 1250 MSCF.
If you require additional information, please don't hesitate to call
me.
Hal Tucker
GPB Production Optimization TL
659-4472
lof!
7/2/20036:27 AM
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) MonthNear of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 07/2003
GATHERING CENTER 1
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1 . Safety
MCF
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3, Flared or vented less than 1 hour. 5,566
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5, Pilot and Purge 37,355
6. Used for lease operations Fuel 859,061
Assist 0
7, Other Lift Gas, Off Field 0
TOTAL items 1 - 7 901,982
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 63,391,380
Remarks:
I hereby ce~ 2r t1 foregoing j, true and correct to the best of my knowledge.
Signature: ~. _ Å.A ~A J ~ Title: SUPERVISOR
2, Lease Use
MCF
3. Conserv, Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPI..ORATlON (AI..ASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS Fl..ARING INCIDENT REPORT
July 2003
~Unplanned Events less than .or equal t.o 1 h.our
DATE TIMEVOL.UMET º¡¡¡$:c;III?TIºNºFP"'ºlpE;NT.~.º~USE
7/6/2003 2052-2058 417 Not required for unplanned events which
717/2003 0822-0829 243 are less than or equal to 1 hour
7/7/2003 0852-0904 417
7/7/2003 1458-1512 486
7/8/2003 1724-1736 417
7/8/2003 1738-1744 417
7/9/2003 0945-0951 208
7/9/2003 1232-1259 938
7/9/2003 1541/1548 243
7/9/2003 1627-1657 1,042
7/26/2003 1405-1416 688
7/28/2003 1855-1859 50
Page 1
ACTION TAKEN TO EUMINATECAUSE
Not required for unplanned events which
are less than or equal to 1 hour
.~
TOTAL
5,566
~Unplanned Events greater than 1 h.our
DATE TIME VOL.UME DESCRIPTION OF INCIDENT & CAUSE .
See attachments
TOTAL
o
~Planned Events Less Than .or E9ual1 Hour AND N.ot Exceedin~ 5000 Met
DATE TIME VOLUME· DESCRIPTION OF INCIDENT & CAUSE·
See attachments
TOTAL 0
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Met
DATE TIME VOI.UME . . DESCRIPTION OF INCIDENT & CAUSI!:
See attachments
TOTAL 0
ACTION TAKEN TO EL.IMINATE CAUSE·
See attachments
. ACTION T AKENT() El.IMINATE CAUSE
See attachments
Unplanned Events < 1 Hour 5,566
Unplanned Events> 1 Hour 0
Planned Events < 1 hour and not 0
exceeding 5,000 MCF
Planned Events> 1 hour or 0
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAl.. FLARED VOI..UME 42,921
ACTION TAKEN TO ELIMINATE¡. CAUSE··
See attachments
8/11/2003
1:27PM
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) MonthNear of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 08/2003
GATHERING CENTER 1
Disposition Volume MCF*
1, Sold 0
2, Reinjected 0
3, Flared or vented less than 1 hour. 313
4, Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 35,238
6. Used for tease operations Fuel 901,597
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 937,148
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 65,804,777
Remarks:
I hereby certD.tat r fOregOin~S true and correct to the best of my knowledge.
Signature: ~(\. .A J AI/^ J A Title: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPI..ORATION (AI..ASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS FI..ARING INCIDENT REPORT
August 2003
Page 1
rUnl:'lanned Events less than or e9ual t.o 1 h.our
DATE .... TIME VOLUMEDESCRIPTION()F INCIDENT & CAUSE.···
8/31/2003 1411-1420 313 Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
313
rUnplanned Events greater than 1 h.our
DATE. TIME VOLUMi:DESCRIPTIONOF INCIDENr & CAUSE·
See attachments
TOTAL
o
IPlanned Events Less Than .or Equal 1 H.our AND N.ot Exceeding 5000 Mcf
. . . DATE. . . TIME . . . VOL.uME DESCRI¡:>TION OF INCIDENT & CAUSE
See attachments
TOTAL 0
Iplanned Events Exceeding 1 H.our OR Exceeding 5000 Mcf
.. DATE.· .. TIME VOLUME DESCRIPTION OF INCIDENT&.CAUSE
See attachments
TOTAL 0
ACTION TAKEN TOELIMI~ATE CAUSE·· .
Not required for unplanned events which
are less than or equal to 1 hour
. . . . . ApTION TAKEN rOELlMINATE CAUSE .
See attachments
.. ACTION. TAKEN TO ELIMINATE CAUSE ....
See attachments
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
o
o
o
TOTAL FLARED VOLUME
35,551
... ACTION TAKEN TO ELIMINATE CAUSE
See attachments
9/9/2003
9:01 AM
,
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) MonthNear of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU I 09/2003
GATHERING CENTER 1
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 9,792
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 33,803
6. Used for lease operations Fuel 870,086
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 913,681
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 66,165,983
Remarks:
I hereby cerz¿tö~ ttforego:f'jiS true and correct to the best of my knowledge,
Signature:· . 1 A Æ. 'lt Title: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1, Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
. " ¡
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS FLARING INCIDENT REPORT
September 2003
Page 1
lunPlanned Events less than or equal to 1 hour
. DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
9/9/2003 1046-1133 9,792 Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELlII.1INATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
9,792
lunplanned Events greater than 1 hour
DATE TIME VOLUME
DESCRIPTION OF INCIDENT & CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
TOTAL
o
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DATE TIME . VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL 0
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mct
DATE TIME. VOLUME DESCRIPTION OF INCIDENT & CAUSE .
See attachments
TOTAL 0
ACTION TAKEN TO ELIMINATE CAUSE ·
See attachments
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
9,792
o
o
o
TOTAL FLARED VOLUME
43,595
10/7/2003
10:25 AM
Disposition Volume MCF*
1. Sold 0
2, Reinjected 0
3, Flared or vented less than 1 hour. 416
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 41 ,593
6. Used for lease operations Fuel 962,939
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 1,004,948
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 69,526,789
Remarks:
I hereby ce~?)at tor~"is true and correct to the best of my knowledge.
Signature: . Å '.11 Title: SUPERVISOR
,
Facility
GATHERING CENTER 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) MonthNear of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 10/2003
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100,00%
1 . Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
Form 10-422 (Revised 4/95)
..
4Þ
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS FLARING INCIDENT REPORT
October 2003
Unplanned Events less than or equal to 1 hour
10/15/2003
1 0/16/2003
1015-1030
0854-0900
208 Not required for unplanned events which
208 are less than or equal to 1 hour
TOTAL
416
I
Iunplanned Events ~reater than 1 hour
. ·.DATE· '. ". TIMEVOWME '. . DESCRIPTION OF INCIDENT & CAUSE . ."
See attachments
TOTAL
o
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
. .·DATE.·· .... TIME. . . ." .·.VOLUME··.DESCRfPTlONOfINCIDENT&CAUSE·
See attachments
TOTAL 0
Not required for unplanned events which
are less than or equal to 1 hour
." ACTlO'4TAKENTOEUMINAreCAUSE' .... '.
See attachments
'. ACTlONTAKENTOeUMINATECAuSE '. .
See attachments
Page 1
Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
. DATE ". ··TIME . . . VOLUME > .·I)ESCRfPTION OF,NCIPENT & CAUSE
See attachments
TOTAL 0
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
416
o
o
o
42,009
··ACTlONTAKENTOEUMINATECAuse· '.
See attachments
I
11/7/2003
1:51 PM
, .
Facility
GATHERING CENTER 1
Disposition
1. Sold
2. Reinjected
3. Flared or vented less than 1 hour.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) MonthNear of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 11/2003
Fuel
Assist
Volume MCF*
0
0
3,063
1,653 ./"
34,163
906,746
0
0
945,525
0
0
0
61,934,030
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge
6. Used for lease operations
7. Other
TOTAL items 1 - 7
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to: CCP
Remarks:
I hereby ce
Signature:
Form 10-422 (Revised 4/95)
Lift Gas, Off Field
is true and correct to the best of my knowledge.
Title: SUPERVISOR
*Indicate contribution of each pool to total.
Pool Name
Code
Percent
PRUDHOE
640150
100.00%
1. Safetÿ
if" '5 3 MCF J8p-
2. Lease Use
MCF
Note: All volumes must be corrected to pressure of 14,65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS FLARING INCIDENT REPORT
November 2003
lunplanned Events less than or equal to 1 hour
... .DATETJME . . VOLUME DESCRIPTION OF I\'IiCIDENT & CAUSE
11/12/2003 0850-0910 306 Not required for unplanned events which
11/12/2003 1937-1945 167 are less than or equal to 1 hour
11/12/2003 1948-2002 1 ,944
11/14/2003 1311-1322 382
11/14/2003 1552-1611 264
Page 1
TOTAL
3,063
tunplanned Events greater than 1 hour
.. .. DATE .. . TIME· . . VOL.UMEDEsCRIPTION OF INCIDENT & CAUSE .
11/5/2003 1224-1622 1,653 See attachments
TOTAL
1,653
tPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DATE .. . . TIME VOLUME .DESCRIPTlONOF INCIDENT & CAUSE
See attachments
TOTAL 0
.. ACTION TAKEN TO ELIMINATE CAUSE .
Not required for unplanned events which
are less than or equal to 1 hour
. .... ACTION TAKEN TO ELIMINATE CAUSE
See attachments
. ACTION TAKEN TO ELIMINATE CAUSE.
See attachments
Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Met
. . DATE . TIME VOLUME .. .. DEsCRIPTIONÇ)F INCIDENT & CAliSE .
See attachments
TOTAL 0
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
3,063
1,653
o
o
38,879
.... ACTION TAKEN TO ELIMINATE CAUSE
See attachments
12/5/2003
10:26 AM
REPORT NO: 03-0613
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC1
DATE: 05 Nav 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 12:24 16:22 3 Hrs 58Mins 0 0 0 1,653 MSCF
TOTAL VOLUME r;õ53''MSCF
First Determination of Cause:
1. Started bringing rate into GC. Sk-18 LP compressor discharge coolers were frozen.
Action Taken to Stop Flaring:
1. Flaring was permitted to continue while trouble shooting and thawing coolers.
Wednesday, November 19, 2003
Page 1 of 1
Flare Report for 11/5103
Subject: Flare Report for 11/5/03
Date: Thu, 06 Nov 200307:20:24 -0900
From: "GPB, Optimization Engr" <GPBOptimizationEngr@BP.com>
To: steve _ mcmains@admin.state.ak.us
Steve
We flared for 3 hrs 58 mins starting at 12:24 on 11/5 . The volume flared
was 1,653 mscf . There was no black smoke.
The event happened during start-up of GC1 after a planned shut-down for ESD testing
and maintenance.
The event was caused by frozen LP compressor discharge coolers in skid 18.
Flaring was permitted to continue while troubleshooting the problem and thawing the
coolers.
regards
Lynda Hutchins
659-4382
I.of I
1116/2003 7:26 AM
GATHERING CENTER 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) MonthNear of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 12/2003
Facility
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
1. Sold
o
Pool Name
Code
Percent
2. Reinjected
o
PRUDHOE
640150
100.00%
3. Flared or vented less than 1 hour.
9,803
o
5. Pilot and Purge
37,360
6. Used for lease operations
Fuel
Assist
1,003,434
o
7. Other
Lift Gas, Off Field
o
TOTAL items 1 - 7
1,050,597
1. Safety
MCF
8. NGL gas equivalent produced
o
2. Lease Use
MCF
9, Purchased gas
o
3. Conserv. Purposes
MCF
10. Transferred from:
o
Commissioner
Date
11. Transferred to: CCP
72,471,818
I hereby certi
true and correct to the best of my knowledge.
Title: SUPERVISOR
Note: All volumes must be corrected to pressure of 14,65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235,
Remarks:
SP EXPLORATION (ALASKA) INC.
PRUDHOE SAY UNIT· GC-1
GAS FLARING INCIDENT REPORT
December 2003
12/5/2003
12/18/2003
12/23/2003
12/29/2003
1001-1009
0413-0428
0610-0650
0134-0140
TOTAL
1,389 Not required for unplanned events which
10 are less than or equal to 1 hour
8,333
71
9,803
IUnplanned Events ~reater than 1 hour
OATE. .. .TIME . VOLUME·· OESCRIPTION OF INCIDENT & CAUSE
See attachments
Not required for unplanned events which
are less than or equal to 1 hour
Page 1
TOTAL
o
Planned Events Less Than or Equal 1 Hour AND Not Exceedin
TOTAL
See attachments
o
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
See attachments
o
o
o
o
47,163
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
See attachments
1/6/2004
3:54 PM