Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPBU GC 1 / BP exploration STATE OF AlASKA AOGCC GAS DISPOSITION FILES YEAR: 2003 FACILITY: PBU GC 1 OPERATOR: BP EXPLORATION (AlASKA) INC GATHERING CENTER 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) IMonthNear of Disposition BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 01/2003 Facility Disposition Volume MCF* 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour. 12,286 4. Flared or vented greater than 1 hour 0 (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 37,360 6. Used for lease operations Fuel 983,435 Assist 0 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 1,033,081 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: CCP 71,152,270 Remarks: I hereby ceO' that t"fOregOino ,is true and correct to the best of my knowledge. Signature: (\ . .A A - J J Title: SUPERVISOR Form 10-422 (Revised 4/95) *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 MC 25.235. 1/2/2003 1/9/2003 1/11/2003 1/12/2003 1/13/2003 1/13/2003 1/14/2003 1/14/2003 1/15/2003 1/18/2003 1/19/2003 1/21/2003 1/22/2003 1/25/2003 1/26/2003 1/26/2003 1/26/2003 1/26/2003 1/26/2003 1/26/2003 1/26/2003 1/27/2003 1/27/2003 1/27/2003 1/28/2003 1/29/2003 1/30/2002 1/31/2003 1/31/2003 0059-0104 1551-1600 0553-0602 1429-1439 1548-1600 2136-2143 1421-1428 2338-2344 1916-1928 0635-0642 0944-0955 0126-0134 0133+0154 0504-0513 0400-0410 0515-0525 0721-0728 0925-0934 0936-0942 1730-1740 1825-1835 0010-0020 0755-0818 2323-2338 1019-1026 0930-0936 1633-1640 2151-2158 2257-2324 TOTAL BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-1 GAS FLARING INCIDENT REPORT January 2003 52 are less than or equal to 1 hour 156 156 173 208 68 122 104 150 49 76 100 510 229 694 694 486 625 417 694 694 694 1,597 313 486 417 486 481 938 12,286 Page 1 are less than or equal to 1 hour IUnplanned Events greater than 1 hour DATE TIME VOI;UME DESCRIPTION OF !NCIDEN! a CAUSE See attachments TOTAL o ACTION TAKEN TO EUMINATE CAUSE See aUachments IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Met DArE TIME .. VOI;UME DESCRIPTIQN.oF INCIDENT a CAUse See aUachments TOTAL 0 TOTAL 1 Hour OR Exceedin 5000 Met Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME 49,646 o o ACTION TAKEN TQ EUMINATE CAUSE See attachments 2/7/2003 9:25 AM GATHERING CENTER 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION loperator Field(s) MonthNear of Disposition BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 02/2003 Facility Disposition Volume MCF* *Indicate contribution of each pool to total. 1, Sold o Pool Name Code Percent 2. Reinjected o PRUDHOE 640150 100.00% 3. Flared or vented less than 1 hour. 10,244 4. Flared or vented greater than 1 hour (Supplemental report re uired - See 20 AAC 25.235) 2,569 5. Pilot and Purge 33,740 6. Used for lease operations Fuel Assist 910,417 o 7. Other Lift Gas, Off Field o TOTAL items 1 - 7 956,970 1. Safety ?t S'b <1 MCF -.:ß;e-. 8. NGL gas equivalent produced o 2. Lease Use MCF 9. Purchased gas o 3. Conserv. Purposes MCF 10. Transferred from: o /~) ~~~ ff/r~J . Commissioner Date 11. Transferred to: CCP 65,508,805 Signature: Form 10-422 (Revised 4/95) true and correct to the best of my knowledge. Title: SUPERVISOR Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25,235. Remarks: BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT· GC-1 GAS FLARING INCIDENT REPORT February 2003 Page 1 ~Unplanned Events less than .or equal t.o 1 h.our DATE TIME VOI..UME DESCRJPTIONOFiINCIDENT&CAUSE 2/1/2003 0846-0854 556 Not required for unplanned events which 2/1/2003 1627-1628 0 are less than or equal to 1 hour 2/1/2003 1645-1652 486 2/2/2003 2337-2358 1,094 2/3/2003 0824-0831 486 2/3/2003 1704-1710 417 2/4/2003 0004-0015 573 2/4/2003 0030-0037 486 2/4/2003 2045-2100 781 2/10/2003 2008-2022 292 2/12/2003 0733-0740 486 2/13/2003 2245-2320 122 2/13/2003 23º-0-2359 4,097 2/19/2003 2323-2330 243 2/28/2003 0420-0432 125 TOTAL 10,244 ~Unplanned Events ~reater than 1 h.our DATE TIME VOI..UME DESCRIPTION OF INCfDENT& CAUSE 2/14/2003 0001-0115 2,569 See attachments TOTAL 2,569 ~Planned Events Less Than .or Equal 1 Hour AND N.ot Exceeding 5000 Met DAtE tiME VOLUME DESCRIPtlöN öFII'lCIDEl'lt & CAuse See attachments TOTAL 0 ~Planned Events Exceeding 1 Hour OR Exceeding 5000 Mct DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments TOTAL 0 TOTAL 10,244 2,569 o ACTION TAKEN TO eLIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE See attachments ACTION TAKEN TO ELIMINATE CAUSE See attachments Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist o TOTAL FLARED VOLUME 46,553 ACTION TAKEN TO ELIMINATE CAUSE See attachments 3/7/2003 3;33 PM REPORT NO: 03-0088 BPXA FLARE REPORT PRUDHOE BAY FACILITY: GC1 DATE: 14 Feb 2003 SYSTEM 1. Flare/Relief Valve TIME OF FLARING Start Stop Duration 00:01 01:15 1 Hrs 14Mins Black Intermittent Smoke o 0 Planned VOLUME o 2,569 MSCF TOTAL VOLUME 2,569 MSCF First Determination of Cause: 1. Data highway errors, K-700 and K-7001 shutdown. Action Taken to Stop Flaring: 1. All LP production, shut-in. K-7000 restarted. Flaring stopped. Monday, February 24, 2003 Page 1 of 1 GPB Flaring Incidents Subject: GPB Flaring Incidents Date: Mon, 17 Feb 2003 13:36:11 -0600 From: "Tucker, Hal E" <TuckerHE@BP.com> To: steve _ mcmains@admin.state.ak.us CC: "Fiedler, Anne M" <FiedleAM@BP.com>, "Benson, Gary A" <BensonGA@BP.com>, "Pfeiffer, Jim A" <PfeiffJA@BP.com>, "GPB, Environ Advisor West" <GPBEnvironAdvisorWest@BP.com>, "GPB, Environ TL" <GPBEnvironTL@BP.com>, "GPB, Environ Advisor East" <GPBEnvironAdvisorEast@BP.com>, "GPB, CGF Ops Lead" <GPBCGFOpsLead@BP.com> > > steve mcmains@admin.state.ak.us > 907-276-7542 To: Steve McMains, AOGCC 907-793-1241, fax > > Leader, 907-659-4472 > > An extended flare incident occurred at GC-1 on February 13 - 14 , 2003. Data highway errors on the backup data highway caused both LPS compressors to shut down instantaneously. The flaring event began at 22:45 on 2/13 and ended at 01:15 on 2/14. This is broken into 2 flare reports to accomodate database limitations, but was one, continuous event. All LP production was choked to minimum to reduce flaring, however due to the -37 deg ambient, production was not shut completely in, to keep fluids moving in the LDF's. Total flare time was 2 hours and 29 minutes. Total flare volume was 6,788 MSCF. From: Hal Tucker, GPB Prod Optim Team > > If you require additional information, please don't hesitate to call me. > > > > > > Hal Tucker GPB Production Optimization TL 659-4472, 659-5566 GPB Flaring Incidents Subj.:,GPB llarmg'lDeideBu Date: Thu, 13 Feb 2003 13:47:35 -0600 From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com> To: steve _ mcmains@admin.state.ak.us CC: "Fiedler, Anne M" <FiedleAM@BP.com>, "Benson, Gary A" <BensonGA@BP.com>, "Pfeiffer, Jim A" <PfeiffJA@BP.com>, "GPB, Environ Advisor West" <GPBEnvironAdvisorW est@BP .com>, "GPB, Environ TL" <GPBEnvironTL@BP.com>, "GPB, Environ Advisor East" <GPBEnvironAdvisorEast@BP.com>, "GPB, Prod Opt TL" <GPBProdOptTL@BP.com>, "GPB, CGF Ops Lead" <GPBCGFOpsLead@BP.com> > > steve mcmains@admin.state.ak.us > 907-276-7542 To: Steve McMains, AOGCC 907-793-1241, fax > > Leader, 907-659-4472 > From: Hal Tucker, GPB Prod Optim Team An extended flare incident occurred on February 11, 2003, during performance testing of the recently overhauled MI turbine 19-1855. Performance testing was required to collect data for engineering calculations of maximum firing temperatures. The appropriate data was successfully acquired. During the testing MI 19-1855 shut down 4 times due to process stability problems. Total flare time was 9 hours and 8 minutes. Total flare volume was 29, 281 MSCF. > If you require additional information, please don't hesitate to call me. > Hal Tucker GPB production Optimization TL 659-4472, 659-5566 GATHERING CENTER 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s MonthNear of Disposition BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 03/2003 Facility Disposition Volume MCF* *Indicate contribution of each pool to total. 1. Sold o Pool Name Code Percent 2. Reinjected o PRUDHOE 640150 100.00% 3. Flared or vented less than 1 hour. 8,985 1,250 5. Pilot and Purge 37,354 6. Used for lease operations Fuel Assist 997,746 o 7. Other Lift Gas, Off Field o TOTAL items 1 -7 1,045,335 1. Safety I, z5D MCF (]13P-- 8. NGL gas equivalent produced o 2. Lease Use MCF 9. Purchased gas , o 3. Conserv. Purposes MCF 10. Transferred from: o ~L4~ Commissioner sjS(03 Date 11. Transferred to: CCP 73,278,328 I hereby ce Signature: Form 10-422 (Revised 4/95) is true and correct to the best of my knowledge. Title: SUPERVISOR Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 MC 25.235. Remarks: BP EXPI..ORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-1 GAS Fl..ARING INCIDENT REPORT March 2003 Page 1 'unplanned Events less than .or equal t.o 1 h.our DATE TIME VOLUME DESCRIPTION OF INCIDENT &.CAUSE 3/3/2003 0309-0316 146 Not required for unplanned events which 3/3/2003 0329-0405 250 are less than or equal to 1 hour 3/3/2003 1453-1459 25 3/4/2003 0843-0849 167 3/6/2003 1624-1655 431 3/18/2003 0527-0549 764 3/18/2003 0907-0937 6,250 3/23/2003 1209-1215 208 3/26/2003 1339-1342 21 3/28/2003 1133-1152 330 3/28/2003 2133-2142 81 3/30/2003 1441-1454 135 3/30/2003 1229-1246 177 TOTAL 8,985 'unplanned Events greater than 1 h.our DATE TIME VOI..UME DESCRIPTION OF INCIDENT & CAUSE 3/6/2003 1145-1247 1 ,250 See attachments TOTAL 1,250 'Planned Events Less Than .or Equal 1 H.our AND N.ot Exceeding 5000 Mcf DATE TIME VOI..UME DESCRIPTION·OFINCIDENT&CÄUSE See attachments TOTAL 0 ~Planned Events Exceeding 1 H.our OR Exceeding 5000 Mcf t DATE TIME VOI..UME DESCRIPTIONOFINCIDENT&CAUSE See attachments TOTAL 0 ACTION TAKEN TO·EI..IMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour ACTION .TAKEN TO ELIMINATE CAUSE See attachments ACTION TAKEN TO ELIMINATE CAUSE See attachments Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FI..ARED VOLUME TOTAL 8,985 1,250 o o 47,589 ACTION TAKEN TO EI..IMINATE CAUSE See attachments 4/8/2003 11:26AM REPORT NO: 03-0117 BPXA FLARE REPORT PRUDHOE BAY FACILITY: GC1 DATE: 06 Mar 2003 SYSTEM 1. Flare/Relief Valve 2. Flare/Relief Valve TIME OF FLARING Black Start Stop Duration Intermittent Smoke Planned VOLUME 11:45 12:47 1Hrs 2Mins 0 0 0 1 ,250 MSCF 16:24 16:55 OHrs 31 Mins 0 0 0 431 MSCF TOTAL VOLUME 1,681 MSCF First Determination of Cause: 1. High gas transit line pressure caused by CGF compressor 1801 shut down due to bad RTD card that signaled a false high bearing temperature SID. 2. High gas transit line pressure caused by CGF compressor 1801 shut down due to bad RTD card that signaled a false high bearing temperature SID. Action Taken to Stop Flaring:. 1. WOA reduced production rates and shut-in 30 wells equaling 500 mmscfd. EOA reduced production rates and shut-in 18 wells equaling 500 mmscfd. Wells were shut-in or choked back starting at 1143 hours. 2. WOA stopped bringing up rates and cut back to previous 500 mmcf rate cut. Monday, March 31, 2003 Page 1 of 1 GPB Flaring Incidents Subject: GPB Flaring Incidents Date: Sun, 9 Mar 2003 13:12:12 -0600 From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com> To: steve _ mcmains@admin.state.ak.us CC: "Fiedler, Anne M" <FiedleAM@BP.com>, "Benson, Gary A" <BensonGA@BP.com>, "Pfeiffer, Jim A" <PfeiffJA@BP.com>, "GPB, Environ Advisor West" <GPBEnvironAdvisorWest@BP.com>, "GPB, Environ TL" <GPBEnvironTL@BP.com>, "GPB, Environ Advisor East" <GPBEnvironAdvisorEast@BP.com> To: Steve McMains, AOGCC steve mcmains@admin.state.ak.us 907-793-1241, fax 907-276-7542 From: Hal Tucker, GPB Prod Optim Team Leader, 907-659-4472 An extended flare incident occurred on March 6, 2003 at GPB WOA. CGF booster 1801 shut down on a false high bearing temperature reading. This requires cutting 800 MMSCFD to get out of flare. Gas cuts began immediately upon losing 1801, with all 3 GC's out of flare at just over an hour after flaring began. WOA cut 500 MMSCFD and EOA cut an additional 500 MMSCFD. and 3 are as follows: Final flaring results for GC's 1, 2, GC1 62 minutes 1250 GC2 62 minutes 861 GC3 60 minutes 1667 MSCF MSCF MSCF Total flare volume 3778 MSCF If you require additional information, please don't hesitate to call me. Hal Tucker GPB production Optimization TL 659-4472, 659-5566 Facility ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) MonthNear of Disposition BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 04/2003 GATHERING CENTER 1 Disposition Volume MCF* 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour. 22,274 4, Flared or vented greater than 1 hour 0 (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 35,450 6. Used for lease operations Fuel 909,383 Assist 0 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 967,107 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: CCP 67,053,442 Remarks: I hereby cefj/hat r::foregoffg is true and correct to the best of my knowledge. Signature: IQ I '"". 1 J Title: SUPERVISOR Form 10-422 (Revised 4/95) *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100,00% 1, Safety MCF 2. Lease Use MCF 3. Conserv, Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14,65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235, BP EXPI..ORATION (ALASKA) INC. PRUDHOE BAY UNIT· GC-1 GAS Fl..ARING INCIDENT REPORT April 2003 Page 1 ~Unplanned Events less than or equal to 1 hour DATE TIME YOLUMEDESCRIPTIONOF'INCIDENT&CAUSE 4/3/2003 0515-0548 160 Not required for unplanned events which 4/4/2004 1925-2013 1,033 are less than or equal to 1 hour 4/4/2003 2229-2241 225 4/5/2003 1230-1235 17 4/6/2003 1222-1228 417 4/6/2003 1929-1940 764 418/2003 1626-1643 130 4/9/2003 1639-1645 208 4/10/2003 1244-1250 208 4/10/2003 1340-1346 208 4/10/2003 1602-1608 208 4/10/2003 1727-1802 2,431 4/11/2003 2205-2210 347 4/12/2003 2133-2139 417 4/14/2003 1428-1434 208 4/14/2003 2058-2108 694 4/14/2003 2301-2307 417 4/15/2003 0012-0024 833 4/15/2003 0552-0606 486 4/15/2003 1024-1030 208 4/15/2003 1559-1604 90 4/15/2003 2220-2232 833 4/16/2003 0210-0216 208 4/16/2003 0335-0341 208 4/16/2003 0453-0459 208 4/16/2003 0655-0701 208 4/16/2003 2200-2218 1 ,250 4/17/2003 1340-1422 694 4/17/2003 1511-1522 344 4/17/2003 1542-1600 556 4/18/2003 1537-1654 1,667 Intermittent, 48 minutes 4/18/2003 1751-1820 2,014 4/19/2003 1621-1627 208 4/20/2003 1800-1822 1,528 4/22/2003 2220-2225 347 4/22/2003 231 0-2316 417 4/23/2003 0020-0025 347 4/23/2003 1208-1218 139 4/26/2003 1058-1105 486 4/26/2003 1901-1908 486 4/28/2003 0638-0644 417 TOTAL 22,274 ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour 5/7/2003 3:47 PM BP EXPI..ORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-1 GAS Fl..ARING INCIDENT REPORT April 2003 Page 2 ¡unplanned Events greater than 1 h.our DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments ACTION TAKEN TO ELIMINATE CAUSE See attachments TOTAL o ¡Planned Events Less Than .or Equal 1 Hour AND N.ot Exceeding 5000 Mct DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments TOTAL 0 ACTION TAKEN TO ELIMINATE CAUSE See attachments ~Planned Events Exceeding 1 H.our OR Exceeding 5000 Mct DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments TOTAL 0 ACTION TAKEN TO ELIMINATE CAUSE See attachments Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist 22,274 o o o TOTAL FI..ARED VOLUME 57,724 5/7/2003 3:47 PM Facility ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) MonthNear of Disposition BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU OS/2003 GATHERING CENTER 1 Disposition Volume MCF* 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour. 9,208 4. Flared or vented greater than 1 hour 1,069 (Supplemental report required - See 20 AAC 25.235) 5, Pilot and Purge 37,862 6. Used for lease operations Fuel 985,489 Assist 0 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 1,033,628 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: CCP 68,529,621 Remarks: I hereby ce~ that tt fOregO~ is true and correct to the best of my knowledge. Signature: I\. ..Å.A d 11 Title: SUPERVISOR Form 10-422 (Revised 4/95) *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1. Safety JObCJ MCF ~.R- 2. Lease Use MCF 3, Conserv. Purposes MCF 7;]1!--"3 Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP EXPI..ORATION (AI..ASKA) INC. PRUDHOE BAY UNIT - GC-1 GAS FLARING INCIDENT REPORT May 2003 Page 1 IUn~lannedEvents less than .or equal t.o 1 h.our DATE TIME VOL.t.lME DESCAIPtIONO.FIIIICIDENTS(CAOSE 5/3/2003 0032-0040 556 Not required for unplanned events which 5/8/2003 2327-2334 53 are less than or equal to 1 hour 5/9/2003 0543-0610 375 5/9/2003 1256-1302 42 5/9/2003 1558-1620 306 5/10/2003 0906-0922 222 5/10/2003 1957-2011 136 5/11/2003 1154-1159 35 5/12/2003 1750-1755 49 5/17/2003 0304-0327 192 5/17/2003 0455-0503 83 5/17/2003 0541-0547 20 /17/2 3 0728-0821 920 517/2003 -083 350 5/17/2003 1600-1617 590 5/18/2003 0620-0641 115 5/20/2003 0307-0400 552 5/20/2003 2244-2250 67 5/21/2003 0142-0146 39 5/21/2003 0838-0844 1 00 5/2 3 0858-0904 208 5/21/2003 0910-1020 3,125 Intermittent - 45 minutes 2/200 5 - 5/31/2003 1521-1544 TOTAL 399 9,208 ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour lunplanned Events ~reater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 5/9/2003 0222-0343 1,069 See attachments TOTAL 1,069 ~Planned Events Less Than .or Equal 1 H.our AND N.ot Exeeedin~ 5000 Mef DATE TIME VOI..UME DESCRIPTION OF INCIDENT & CAUSE See attachments TOTAL 0 ACTION TAKEN TO ELIMINATE CAUSE See attachments ACTION TAKEN TO EL.IMINATE CAUSE See attachments 6/9/2003 11:36AM BP EXPI..ORATION (AI..ASKA) INC. PRUDHOE BAY UNIT - GC-1 GAS Fl..ARING INCIDENT REPORT May 2003 Page 2 ¡Planned Events Exceeding 1 H.our OR Exceeding 5000 Mcf DATE TIME VOI..UME DESCRIPTION OF INCIDENT & CAUSE See attachments TOTAL 0 ACTION TAKEN TO ELIMINATE CAUSE See attachments Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist 1,069 o o TOTAL FLARED VOI..UME 48,139 6/9/2003 11:36AM REPORT NO: 03-0283 BPXA FLARE REPORT PRUDHOE BAY FACILITY: GC1 DATE: 09 May 2003 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 02:22 03:43 1 Hrs 21 Mins 0 0 0 1,069 MSCF 2. Flare/Relief Valve 05:43 06:10 OHrs 27 Mins 0 0 0 375 MSCF 3. Flare/Relief Valve 12:56 13:02 OHrs 6Mins 0 0 0 42 MSCF 4. Flare/Relief Valve 15:58 16:20 OHrs 22 Mins 0 0 0 306 MSCF TOTAL VOLUME 1,792 MSCF First Determination of Cause: 1. High gas transit line pressure caused by CCP compressor problems due to adjusting field line up for fuel gas supply pressure. 2. High gas transit line pressure caused by CCP compressor problems due to 1808 re-cycle problem. 3. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by rF. 4. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by 3°F. Action Taken to Stop Flaring: 1. WOA reduced production rates and shut-in 36 wells equaling 320 mmscfd. Wells were shut-in or choked back starting at 0222 hours. 2. WOA reduced production rates and shut-in wells equaling 94 mmscfd. Wells were shut-in or choked back starting at 05:43. 3. WOA reduced production rates and shut-in wells equaling 24 mmscfd. Wells were shut-in or choked back starting at 12:56. 4. WOA reduced production rates and shut-in wells equaling 90 mmscfd. Wells were shut-in or choked back starting at 15:58. Friday, May 23, 2003 Page 1 of 1 bp REPORT NO: 03-0311 BPXA FLARE REPORT PRUDHOE BAY FACILITY: GC1 DATE: 17 May 2003 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 03:04 03:27 o Hrs 23Mins ~ 0 0 192 MSCF 2. Flare/Relief Valve 04:55 05:03 OHrs 8Mins 0 0 0 83 MSCF 3. Flare/Relief Valve 05:41 05:47 OHrs 6Mins 0 0 0 208 MSCF 4. Flare/Relief Valve 07:28 08:21 o Hrs 53 Mins 0 0 0 920 MSCF 5. Flare/Relief Valve 08:26 08:36 o Hrs 10 Mins 0 0 0 350 MSCF 6. Flare/Relief Valve 16:00 16:17 OHrs 17 Mins 0 0 0 590 MSCF TOTAL VOLUME 2,343 MSCF First Determination of Cause: 1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature limited the performance of the LPS turbines causing the slugcatchers to flare. 2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature limited the performance of the LPS turbines causing the slugcatchers to flare. 3. The Carry Over Prevention System initiated LPS flare valve opening to prevent contactor floodinglTEG carryover due to high contactor differential pressure. 4. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature limited the performance of the LPS turbines causing the slugcatchers to flare. 5. The Carry Over Prevention System initiated LPS flare valve opening to prevent contactor floodinglTEG carryover due to high contactor differential pressure. Large rate cut to stop flaring caused large pressure drop in transit line 6. The Carry Over Prevention System initiated LPS flare valve opening to prevent contactor f oodinglTEG carryover due to high contactor differential pressure. Action Taken to Stop Flaring: 1. WOA reduced production rates and shut-in 4 wells equaling 52 mmscfd. Wells were shut-in or choked back starting at 0304 hours. Friday, May 23, 2003 Page 1 of 2 bp REPORT NO: 03-0311 BPXA FLARE REPORT PRUDHOE BAY FACILITY: GC1 DATE: 17 May 2003 :l. / WOA reduced production rates and shut-in 4 wells equaling 52 mmscfd. Wells were shut-in or choked back starting at 0455 hours. ) ¡f. Wells unloaded and flaring was ceased. '-t Vf. WOA reduced production rates equaling 170 mmscfd. Wells were shut-in or choked back starting at 0730 hours. ~ y( Wells unloaded and flaring was ceased. b J.i Wells unloaded and flaring was ceased. Friday, May 23, 2003 Page 2 of 2 bp REPORT NO: 03-0330 BPXA FLARE REPORT PRUDHOE BAY FACILITY: GC1 DATE: 21 May 2003 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 01:42 01:46 o Hrs 4Mins D D C 39 MSCF 2. Flare/Relief Valve 08:38 08:44 OHrs 6Mins D D C 100 MSCF 3. Flare/Relief Valve 08:58 09:04 OHrs 6Mins D D C 208 MSCF 4. Flare/Relief Valve 09:10 10:20 o Hrs 45Mins ~ D C 3,125 MSCF TOTAL VOLUME 3,472 MSCF First Determination of Cause: 1. While unloading a well to the LP system after a logging job the slugcatchers went to flare. 2. While unloading a well while logging, LPS compressors exceeded maximum gas capacity and discharged to flare. 3. The Carry Over Prevention System initiated LPS flare valve opening to prevent contactor fJooding/TEG carryover when gas rates exceeded the 1140 mmscfd operability limit. 4. The Carry Over Prevention System initiated LPS flare valve opening to prevent contactor flooding/TEG carryover when gas rates exceeded the high OP across Odd contactor limit. Action Taken to Stop Flaring: 1. Moved well number 0-30 to the HP system at 0142hrs. 2. Switched well back to HP 3. WOA well unloaded and flaring was ceased. 4. Reduced gas rate, which lowered OP across contactor. Friday, May 23, 2003 Page 1 of 1 GATHERING CENTER 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) Month/Year of Disposition BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 06/2003 Facility Disposition Volume MCF* *Indicate contribution of each pool to total. 1. Sold o Pool Name Code Percent 2. Reinjected o PRUDHOE 640150 100,00% 3. Flared or vented less than 1 hour. 8,171 / 4, Flared or vented greater than 1 hour (Supplemental report required - See 20 AAC 25.235) 12,535 - 5. Pilot and Purge 36,152 6, Used for lease operations Fuel Assist 871,616 o 7. Other Lift Gas, Off Field o -.-. . .. _. . . , > 1 nr. TOTAL items 1 - 7 928,474 1. Safety lZ( <;'35 MCF 55J?-' 8. NGL gas equivalent produced o 2. Lease Use MCF o 3. Conserv. Purposes ~ ...- W~~ Commissioner / MCF 9. Purchased gas o 10. Transferred from: lß/ /3 D~t' 11. Transferred to: CCP 63,820,984 Remarks: Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. I hereby ce~ ~t t~e foregoi~ is true and correct to the best of my knowledge. Signature: \) 1 J. ^-. .Å. A ",,)i 11 Title: SUPERVISOR Form 1 0-422 (Revised 4/95) BP EXPI..ORATION (AI..ASKA) INC. PRUDHOE BAY UNIT· GC-1 GAS FI..ARING INCIDENT REPORT June 2003 Page 1 ~Un )lanned Events less than .or equal t.o 1 hour DATE TIME VOI..UMEDESCRIP1'ION:OFINCIOENT&CAOSE 6/1/2003 0350-0401 92 Not required for unplanned events which 6/1/2003 0840-0858 250 are less than or equal to 1 hour 6/5/2003 1216-1223 243 6/7/2003 1555-1606 382 6/8/2003 2029-2037 111 6/9/2003 1812-1841 3,021 6/11/2003 0530-0556 1,632 6/12/2003 1218-1223 175 6/12/2003 1440-1445 175 6/16/2003 2155-2220 1,736 6/20/2003 1110-1116 146 6/30/2003 2114-2120 208 TOTAL 8,171 IUnplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 6/9/2003 0828-0933 11,285 See attachments 6/30/2003 2115-2230 1,250 TOTAL 12,535 ~Planned Events Less Than .or Equal 1 H.our AND Not Exceedin~ 5000 Mcf DATE TIME VOI..UME DESCRIPTIOIII OF INCIDENT & CAUSE See attachments TOTAL 0 Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments TOTAL 0 Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist 12,535 o o TOTAl.. FLARED VOLUME 56,858 ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE See attachments ACTION TAKEIII TO EI..IMIIIIATE CAUSE See attachments ACTION TAKEN TO ELIMINATE CAUSE See attachments 7/9/2003 1:59PM FACILITY: GC1 SYSTEM 1. Flare/Relief Valve 2. Flare/Relief Valve REPORT NO: 03-0403 BPXA FLARE REPORT PRUDHOE BAY DATE: 30 Jun 2003 TIME OF FLARING Black Start Stop Duration Intermittent Smoke Planned VOLUME 21:14 21:20 OHrs 6Mins 0 0 0 208 MSCF 21:15 22:30 1 Hrs 15 Mins 0 0 0 1 ,250 MSCF TOTAL VOLUME 1 ,458 MSCF First Determination of Cause: 1. The Carry Over Prevention System initiated LPS flare valve opening to prevent contactor floodingfTEG carryover when gas rates exceeded the 1140 mmscfd operability limit. 2. Sk-18 LP compressor lost suction because of a problem associated with high ambient temperature and changing rate. Assist gas was used to prevent black smoke. Action Taken to Stop Flaring: 1. WOA reduced production rates equaling 20 mmscfd. Wells were choked back starting at 2115 hours. 2. Inspected separators to check for possible blow-by from second stage. Reloaded compressor after several tries. Tuesday, July 01, 2003 Page 1 of 1 »I~ ~J:fo O~~ ~ REPORT NO: 03-0371 BPXA FLARE REPORT PRUDHOE BAY FACILITY: GC1 DATE: 09 Jun 2003 SYSTEM 1. Flare/Relief Valve 2. Flare/Relief Valve TIME OF FLARING Black Start Stop Duration Intermittent Smoke Planned VOLUME 08:28 09:33 1 Hrs 5Mins 0 0 0 11,285 MSCF 18:12 18:41 OHrs 29 Mins 0 0 0 3,021 MSCF TOTAL VOLUME 14,306 MSCF First Determination of Cause: 1. High gas transit line pressure caused by CGF compressor problems due to Booster compressor 1802 shutdown. 2. Due to CGF compressor problem, gas transit line pressured up, Annex wet gas flare valve to 300mmscfpd flare rate. Action Taken to Stop Flaring: 1. WOA reduced production rates and shut-in 16 wells equaling 256 mmscfd. Wells were shut-in or choked back starting at 08:31 hours. 2. Reduced chokes on 14 wells to minimum, equal to 300mmscfpd gas rate, flaring stopped. Thursday, June 26, 2003 Page 1 of 1 Ld.B t'Janng Incident Subject: GPB Flaring Incident Date: Tue, 1 Jul2003 19:22:00 -0500 From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com> To: steve _ mcmains@admin.state.ak.us CC: "Fiedler, Anne Mil <FiedleAM@BP.com>, "Benson, Gary A" <BensonGA@BP.com>, "Pfeiffer, Jim A" <PfeiffJA@BP.com>, "GPB, Environ Advisor West" <GPBEnvironAdvisorWest@BP.com>, "GPB, Environ TL" <GPBEnvironTL@BP.com>, "GPB, Environ Advisor East" <GPBEnvironAdvisorEast@BP.com> To: Steve McMains, AOGCC steve mcmains@admin.state.ak.us 907-793-1241, fax 907-276-7542 From: Hal Tucker, GPB Prod Optim Team Leader, 907-659-4472 An extended flare event occurred on June 30, 2003 at GC1. The Carry OVer Protection System initiated flaring off the slug catchers when the pressure drop across the TEG/gas contactor exceeded the operability limit. 20 MMSCFD of gas was cut, closing the slug catcher flare valves within 6 minutes. The combination of high ambient temperature and rate change caused the skid 18 LP compressor to lose suction and shut down. Several attempts were required to restart the LP compressor resulting in a 1 hour and 15 minute flare event. Assist gas was added to the LP gas to avoid black smoke. Total flare volume for the 1 hour event was 1250 MSCF. If you require additional information, please don't hesitate to call me. Hal Tucker GPB Production Optimization TL 659-4472 lof! 7/2/20036:27 AM Facility ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) MonthNear of Disposition BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 07/2003 GATHERING CENTER 1 Form 10-422 (Revised 4/95) *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1 . Safety MCF Disposition Volume MCF* 1. Sold 0 2. Reinjected 0 3, Flared or vented less than 1 hour. 5,566 4. Flared or vented greater than 1 hour 0 (Supplemental report required - See 20 AAC 25.235) 5, Pilot and Purge 37,355 6. Used for lease operations Fuel 859,061 Assist 0 7, Other Lift Gas, Off Field 0 TOTAL items 1 - 7 901,982 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: CCP 63,391,380 Remarks: I hereby ce~ 2r t1 foregoing j, true and correct to the best of my knowledge. Signature: ~. _ Å.A ~A J ~ Title: SUPERVISOR 2, Lease Use MCF 3. Conserv, Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP EXPI..ORATlON (AI..ASKA) INC. PRUDHOE BAY UNIT - GC-1 GAS Fl..ARING INCIDENT REPORT July 2003 ~Unplanned Events less than .or equal t.o 1 h.our DATE TIMEVOL.UMET º¡¡¡$:c ;III?TIºNºFP "'ºlpE;NT.~.º~USE 7/6/2003 2052-2058 417 Not required for unplanned events which 717/2003 0822-0829 243 are less than or equal to 1 hour 7/7/2003 0852-0904 417 7/7/2003 1458-1512 486 7/8/2003 1724-1736 417 7/8/2003 1738-1744 417 7/9/2003 0945-0951 208 7/9/2003 1232-1259 938 7/9/2003 1541/1548 243 7/9/2003 1627-1657 1,042 7/26/2003 1405-1416 688 7/28/2003 1855-1859 50 Page 1 ACTION TAKEN TO EUMINATECAUSE Not required for unplanned events which are less than or equal to 1 hour .~ TOTAL 5,566 ~Unplanned Events greater than 1 h.our DATE TIME VOL.UME DESCRIPTION OF INCIDENT & CAUSE . See attachments TOTAL o ~Planned Events Less Than .or E9ual1 Hour AND N.ot Exceedin~ 5000 Met DATE TIME VOLUME· DESCRIPTION OF INCIDENT & CAUSE· See attachments TOTAL 0 IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Met DATE TIME VOI.UME . . DESCRIPTION OF INCIDENT & CAUSI!: See attachments TOTAL 0 ACTION TAKEN TO EL.IMINATE CAUSE· See attachments . ACTION T AKENT() El.IMINATE CAUSE See attachments Unplanned Events < 1 Hour 5,566 Unplanned Events> 1 Hour 0 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events> 1 hour or 0 exceeding 5,000 MCF Pilot Purge Assist TOTAl.. FLARED VOI..UME 42,921 ACTION TAKEN TO ELIMINATE¡. CAUSE·· See attachments 8/11/2003 1:27PM Facility ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) MonthNear of Disposition BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 08/2003 GATHERING CENTER 1 Disposition Volume MCF* 1, Sold 0 2, Reinjected 0 3, Flared or vented less than 1 hour. 313 4, Flared or vented greater than 1 hour 0 (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 35,238 6. Used for tease operations Fuel 901,597 Assist 0 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 937,148 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: CCP 65,804,777 Remarks: I hereby certD.tat r fOregOin~S true and correct to the best of my knowledge. Signature: ~(\. .A J AI/^ J A Title: SUPERVISOR Form 10-422 (Revised 4/95) *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP EXPI..ORATION (AI..ASKA) INC. PRUDHOE BAY UNIT - GC-1 GAS FI..ARING INCIDENT REPORT August 2003 Page 1 rUnl:'lanned Events less than or e9ual t.o 1 h.our DATE .... TIME VOLUMEDESCRIPTION()F INCIDENT & CAUSE.··· 8/31/2003 1411-1420 313 Not required for unplanned events which are less than or equal to 1 hour TOTAL 313 rUnplanned Events greater than 1 h.our DATE. TIME VOLUMi:DESCRIPTIONOF INCIDENr & CAUSE· See attachments TOTAL o IPlanned Events Less Than .or Equal 1 H.our AND N.ot Exceeding 5000 Mcf . . . DATE. . . TIME . . . VOL.uME DESCRI¡:>TION OF INCIDENT & CAUSE See attachments TOTAL 0 Iplanned Events Exceeding 1 H.our OR Exceeding 5000 Mcf .. DATE.· .. TIME VOLUME DESCRIPTION OF INCIDENT&.CAUSE See attachments TOTAL 0 ACTION TAKEN TOELIMI~ATE CAUSE·· . Not required for unplanned events which are less than or equal to 1 hour . . . . . ApTION TAKEN rOELlMINATE CAUSE . See attachments .. ACTION. TAKEN TO ELIMINATE CAUSE .... See attachments Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist o o o TOTAL FLARED VOLUME 35,551 ... ACTION TAKEN TO ELIMINATE CAUSE See attachments 9/9/2003 9:01 AM , Facility ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) MonthNear of Disposition BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU I 09/2003 GATHERING CENTER 1 Disposition Volume MCF* 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour. 9,792 4. Flared or vented greater than 1 hour 0 (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 33,803 6. Used for lease operations Fuel 870,086 Assist 0 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 913,681 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: CCP 66,165,983 Remarks: I hereby cerz¿tö~ ttforego:f'jiS true and correct to the best of my knowledge, Signature:· . 1 A Æ. 'lt Title: SUPERVISOR Form 10-422 (Revised 4/95) *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1, Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. . " ¡ BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-1 GAS FLARING INCIDENT REPORT September 2003 Page 1 lunPlanned Events less than or equal to 1 hour . DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 9/9/2003 1046-1133 9,792 Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELlII.1INATE CAUSE Not required for unplanned events which are less than or equal to 1 hour TOTAL 9,792 lunplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments ACTION TAKEN TO ELIMINATE CAUSE See attachments TOTAL o Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct DATE TIME . VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments TOTAL 0 ACTION TAKEN TO ELIMINATE CAUSE See attachments Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mct DATE TIME. VOLUME DESCRIPTION OF INCIDENT & CAUSE . See attachments TOTAL 0 ACTION TAKEN TO ELIMINATE CAUSE · See attachments Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist 9,792 o o o TOTAL FLARED VOLUME 43,595 10/7/2003 10:25 AM Disposition Volume MCF* 1. Sold 0 2, Reinjected 0 3, Flared or vented less than 1 hour. 416 4. Flared or vented greater than 1 hour 0 (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 41 ,593 6. Used for lease operations Fuel 962,939 Assist 0 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 1,004,948 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: CCP 69,526,789 Remarks: I hereby ce~?)at tor~"is true and correct to the best of my knowledge. Signature: . Å '.11 Title: SUPERVISOR , Facility GATHERING CENTER 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) MonthNear of Disposition BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 10/2003 *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100,00% 1 . Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 (Revised 4/95) .. 4Þ BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-1 GAS FLARING INCIDENT REPORT October 2003 Unplanned Events less than or equal to 1 hour 10/15/2003 1 0/16/2003 1015-1030 0854-0900 208 Not required for unplanned events which 208 are less than or equal to 1 hour TOTAL 416 I Iunplanned Events ~reater than 1 hour . ·.DATE· '. ". TIMEVOWME '. . DESCRIPTION OF INCIDENT & CAUSE . ." See attachments TOTAL o Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf . .·DATE.·· .... TIME. . . ." .·.VOLUME··.DESCRfPTlONOfINCIDENT&CAUSE· See attachments TOTAL 0 Not required for unplanned events which are less than or equal to 1 hour ." ACTlO'4TAKENTOEUMINAreCAUSE' .... '. See attachments '. ACTlONTAKENTOeUMINATECAuSE '. . See attachments Page 1 Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf . DATE ". ··TIME . . . VOLUME > .·I)ESCRfPTION OF,NCIPENT & CAUSE See attachments TOTAL 0 Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME 416 o o o 42,009 ··ACTlONTAKENTOEUMINATECAuse· '. See attachments I 11/7/2003 1:51 PM , . Facility GATHERING CENTER 1 Disposition 1. Sold 2. Reinjected 3. Flared or vented less than 1 hour. ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) MonthNear of Disposition BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 11/2003 Fuel Assist Volume MCF* 0 0 3,063 1,653 ./" 34,163 906,746 0 0 945,525 0 0 0 61,934,030 4. Flared or vented greater than 1 hour (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 6. Used for lease operations 7. Other TOTAL items 1 - 7 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from: 11. Transferred to: CCP Remarks: I hereby ce Signature: Form 10-422 (Revised 4/95) Lift Gas, Off Field is true and correct to the best of my knowledge. Title: SUPERVISOR *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1. Safetÿ if" '5 3 MCF J8p- 2. Lease Use MCF Note: All volumes must be corrected to pressure of 14,65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-1 GAS FLARING INCIDENT REPORT November 2003 lunplanned Events less than or equal to 1 hour ... .DATETJME . . VOLUME DESCRIPTION OF I\'IiCIDENT & CAUSE 11/12/2003 0850-0910 306 Not required for unplanned events which 11/12/2003 1937-1945 167 are less than or equal to 1 hour 11/12/2003 1948-2002 1 ,944 11/14/2003 1311-1322 382 11/14/2003 1552-1611 264 Page 1 TOTAL 3,063 tunplanned Events greater than 1 hour .. .. DATE .. . TIME· . . VOL.UMEDEsCRIPTION OF INCIDENT & CAUSE . 11/5/2003 1224-1622 1,653 See attachments TOTAL 1,653 tPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct DATE .. . . TIME VOLUME .DESCRIPTlONOF INCIDENT & CAUSE See attachments TOTAL 0 .. ACTION TAKEN TO ELIMINATE CAUSE . Not required for unplanned events which are less than or equal to 1 hour . .... ACTION TAKEN TO ELIMINATE CAUSE See attachments . ACTION TAKEN TO ELIMINATE CAUSE. See attachments Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Met . . DATE . TIME VOLUME .. .. DEsCRIPTIONÇ)F INCIDENT & CAliSE . See attachments TOTAL 0 Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME 3,063 1,653 o o 38,879 .... ACTION TAKEN TO ELIMINATE CAUSE See attachments 12/5/2003 10:26 AM REPORT NO: 03-0613 BPXA FLARE REPORT PRUDHOE BAY FACILITY: GC1 DATE: 05 Nav 2003 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 12:24 16:22 3 Hrs 58Mins 0 0 0 1,653 MSCF TOTAL VOLUME r;õ53''MSCF First Determination of Cause: 1. Started bringing rate into GC. Sk-18 LP compressor discharge coolers were frozen. Action Taken to Stop Flaring: 1. Flaring was permitted to continue while trouble shooting and thawing coolers. Wednesday, November 19, 2003 Page 1 of 1 Flare Report for 11/5103 Subject: Flare Report for 11/5/03 Date: Thu, 06 Nov 200307:20:24 -0900 From: "GPB, Optimization Engr" <GPBOptimizationEngr@BP.com> To: steve _ mcmains@admin.state.ak.us Steve We flared for 3 hrs 58 mins starting at 12:24 on 11/5 . The volume flared was 1,653 mscf . There was no black smoke. The event happened during start-up of GC1 after a planned shut-down for ESD testing and maintenance. The event was caused by frozen LP compressor discharge coolers in skid 18. Flaring was permitted to continue while troubleshooting the problem and thawing the coolers. regards Lynda Hutchins 659-4382 I.of I 1116/2003 7:26 AM GATHERING CENTER 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) MonthNear of Disposition BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 12/2003 Facility Disposition Volume MCF* *Indicate contribution of each pool to total. 1. Sold o Pool Name Code Percent 2. Reinjected o PRUDHOE 640150 100.00% 3. Flared or vented less than 1 hour. 9,803 o 5. Pilot and Purge 37,360 6. Used for lease operations Fuel Assist 1,003,434 o 7. Other Lift Gas, Off Field o TOTAL items 1 - 7 1,050,597 1. Safety MCF 8. NGL gas equivalent produced o 2. Lease Use MCF 9, Purchased gas o 3. Conserv. Purposes MCF 10. Transferred from: o Commissioner Date 11. Transferred to: CCP 72,471,818 I hereby certi true and correct to the best of my knowledge. Title: SUPERVISOR Note: All volumes must be corrected to pressure of 14,65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235, Remarks: SP EXPLORATION (ALASKA) INC. PRUDHOE SAY UNIT· GC-1 GAS FLARING INCIDENT REPORT December 2003 12/5/2003 12/18/2003 12/23/2003 12/29/2003 1001-1009 0413-0428 0610-0650 0134-0140 TOTAL 1,389 Not required for unplanned events which 10 are less than or equal to 1 hour 8,333 71 9,803 IUnplanned Events ~reater than 1 hour OATE. .. .TIME . VOLUME·· OESCRIPTION OF INCIDENT & CAUSE See attachments Not required for unplanned events which are less than or equal to 1 hour Page 1 TOTAL o Planned Events Less Than or Equal 1 Hour AND Not Exceedin TOTAL See attachments o Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf TOTAL Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME See attachments o o o o 47,163 ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments See attachments 1/6/2004 3:54 PM