HomeMy WebLinkAboutPBU GC 2 / BP Exploration
STATE OF ALASKA
AOGCC
GAS DISPOSITION FILES
YEAR: 2003
FACILITY: PBU GC 2
OPERATOR: BP EXPLORATION
(ALASKA) INC
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 01/2003
GATHERING CENTER 2
Disposition Volume MCF"
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 2,731
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 MC 25.235)
5. Pilot and Purge 26,402
6. Used for lease operations Fuel 632,236
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 . 7 661,369
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 20,438,923
Remarks:
I hereby ce~ ~that ~e fOregOin~Js true and correct to the best of my knowledge.
Signature: : 0 . J. J.II/ñ. 'JI Title: SUPERVISOR
Form 10-422 (Revised 4/95)
"Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 MC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BA V UNIT - GC-2
GAS FLARING INCIDENT REPORT
January 2003
Page 1
runplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT 8. CAUSE
1/6/2003 1340-1349 125 Not required for unplanned events which
1/11/2003 1759-1854 1,719 are less than or equal to 1 hour
1/12/2003 1437-1448 95
1/20/2003 2238-2253 104
1/20/2003 2318-2344 181
1/21/2003 0226-0312 319
1/25/2003 0916-0934 188
TOTAL
2,731
rUnplanned Events greater than 1 hour
DATE TIME VOLUME
DESCRIPTION OF INCIDENT 8. CAUSE
See Attachments
TOTAL
o
~Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Met
DATE TIME VOLUME DESCRIPTION OF INCIDENT 8. CAUSE
See Attachments
TOTAL
o
~Planned Events Exceeding 1 Hour OR Exceeding 5000 Met
DATE TIME VOLUME DESCRIPTION OF INCIDENT 8. CAUSE
See Attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
2,731
o
o
o
TOTAL FLARED VOLUME
29,133
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
217/2003
9:26 AM
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator I Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 02/2003
GATHERING CENTER 2
Disposition Volume MCF"
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 7,690
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 25,010
6. Used for lease operations Fuel 610,141
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 642,841
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 18,511,425
Remarks:
I hereby certZ1hat theL:g~true and correct to the best of my knowledge.
Signature: O. Â 1J Title: SUPERVISOR
~
Form 10-422 (Revised 4/95)
"Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-2
GAS FLARING INCIDENT REPORT
February 2003
Page 1
lunplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
2/13/2003 1354-1408 97 Not required for unplanned events which
2/24/2003 1115-1150 4,253 are less than or equal to 1 hour
2/25/2003 2000-2013 3,340
TOTAL
7,690
~Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL
o
,
~Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL
o
~
~Planned Events Exceeding 1 Hour OR Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
o
o
o
32,700
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
3/7/2003
3:33 PM
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
perator Field(s Month/Year of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 03/2003
GATHERING CENTER 2
Disposition Volume MCF"
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 1,163
4. Flared or vented greater than 1 hour 1,834 .,/
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 22,941
6. Used for lease operations Fuel 707,504
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL.items 1 -7 733,442
8. NGL gas equivalent produced 0
9. Purchased gas t 0
10. Transferred from: 0
11. Transferred to: CCP 20,676,001
Remarks:
I hereby ce~ lj th~fOregOi~VS true and correct to the best of my knowledge.
Signature: . . Á.AM A I Title: SUPERVISOR
Form 10-422 Revised 4/95
"Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
II '3:34 MCF JßJ<L
2. Lease Use
MCF
3. Conserv. Purposes
MCF
~~~~
Commissioner
51B( 0")
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BA V UNIT· Gc-2
GAS FLARING INCIDENT REPORT
March 2003
IUnplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT 8. CAUSE
3/3/2003 0939-1023 153 Not required for unplanned events which
3/6/2003 1413-1422 81 are less than or equal to 1 hour
3/6/2003 1425-1430 35
3/6/2003 1614-1628 146
3/6/2003 1641-1650 113
3/6/2003 2112-2133 130
3/7/2003 0309-0335 100
3/10/2003 0845-0856 76
3/17/2003 2345-2355 69
3/19/2003 1234-1248 204
0325-03 1642-1650 56
Page 1
TOTAL
1,163
lunPlanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT 8. CAUSE
3/1/2003 0334-0650 681 See Attachments
3/1/2003 0725-0849 292
3/6/2003 1146-1248 861
TOTAL
;../
1,834
ACTIONTAKENTO ELIMINATE CAUSE
Not required tor unplanned events which
are less than or equal to 1 hour
ACTION·TAKENTO·ELIMINATECAUSE
See Attachments
'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Met
DATE TIME VOLUME DESCRIPTION OF INCIDENT 8. CAUSE
See Attachments
TOTAL
o
~Planned Events Exceeding 1 Hour OR Exceeding 5000 Met
DATE TIME VOLUME DESCRIPTION OF INCIDENT 8. CAUSE
See Attachments
TOTAL
o
,
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
TOTAL
1,163
1,834
o
o
25,938
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
4/8/2003
11:33AM
REPORT NO: 03-01 08
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC2
DATE: 01 Mar 2003
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
03:34 06:50 3Hrs 16 Mins 0 0 0 681 MSCF
07:25 08:49 1 Hrs 24Mins 0 0 0 292 MSCF
TOTAL VOLUME 973 MSCF
First Determination of Cause:
1. Sk-18lP compressor shut down because of a High level V-220 that initated a stop production
2. Sk-18lP compressor (K-205) was shut down due to excessive noise after restart.
Action Taken to Stop Flaring:
1. Flaring was permitted to continue while GC operations personnel attempted to reset stop production
and restart the equipment. Z, l & V pads SID at same time.
2. Flaring was permitted to continue while GC operations personnel attempted to start off-line
compressor (K-206). Stopped bring up rate to GC @ 0730 hrs.
Monday, March 31, 2003
Page 1 of 1
REPORT NO: 03-0118
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC2 DATE: 06 Mar 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 11:46 12:48 1 Hrs 2Mins 0 0 0 861 MSCF
2. Flare/Relief Valve 14:13 14:22 OHrs 9Mins 0 0 0 81 MSCF
3. Flare/Relief Valve 14:25 14:30 OHrs 5Mins 0 0 0 35 MSCF
4. Flare/Relief Valve 16:14 16:28 OHrs 14Mins 0 0 0 146 MSCF
5. Flare/Relief Valve 16:41 16:50 OHrs 9Mins 0 0 0 113 MSCF
6. Flare/Relief Valve 21:12 21:33 OHrs 17 Mins ~ 0 0 130 MSCF
TOTAL VOLUME 1,366 MSCF
First Determination of Cause:
1. High gas transit line pressure caused by CGF compressor 1801 shut down due to bad RTD card that
signaled a false high bearing temperature SID.
2. High gas transit line pressure caused by CGF compressor 1801 shut down due to bad power supply
card. Slug catcher flared due to high transit gas pressure.
3. High gas transit line pressure caused by CGF compressor 1801 shut down due to bad power supply
card. Slug catcher flared due to high transit gas pressure.
4. High gas transit line pressure caused by CGF compressor 1801 going down due to a bad RTD card.
5. High gas transit line pressure caused by CGF compressor 1801 going down due to a bad RTD card.
6. While bringing production rates up following CGF problem, LPS compressors exceeded maximum
gas capacity and discharged to flare. Seems ambient temperature has increased causing less
compressor efficiency
Action Taken to Stop Flaring:
1. WOA reduced production rates and shut-in 30 wells equaling 500 mmscfd. EOA reduced production
rates and shut-in 18 wells equaling 500 mmscfd. Wells were shut-in or choked back starting at 1143
hours.
Monday, March 31, 2003
Page 1 of 2
REPORT NO: 03-0118
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC2
DATE: 06 Mar 2003
;)- ft'Moved wells to HP system, and choked back a well.
3 X Moved a well over to GC-1 LP through H-pad.
'1 JÆr. WOA stopped bringing up rates and cut back to previous 500 mmcf rate cut.
&" j;I-: Cut a couple more LP wells to get B-Slug catcher out of flare, due to high trransit.
b 1.2:' WOA reduced production rates equaling 15 mmscfd. Wells were choked back starting at 2120
hours.
Monday, March 31, 2003
Page 2 of 2
Gl.B 1< Janng Incident
Subject: GPB Flaring Incident
Date: Sat, 1 Mar 2003 16:12:29 -0600
From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com>
To: steve_mcmains@admin.state.ak.us
CC: "Fiedler, Anne M" <FiedleAM@BP.com>, "Benson, Gary A" <BensonGA@BP.com>,
"Pfeiffer, Jim A" <PfeifDA@BP.com>,
"GPB, Environ Advisor West" <GPBEnvironAdvisorWest@BP.com>,
"GPB, Environ TL" <GPBEnvironTL@BP.com>,
"GPB, Environ Advisor East" <GPBEnvironAdvisorEast@BP.com>
>
>
steve mcmains@admin.state.ak.us
>
907-276-7542
To:
Steve McMains, AOGCC
907-793-1241, fax
>
>
Team Leader, 907-659-5566
From:
Michael Bolkovatz, GPB Prod Optim
>
> An extended flare incident occurred on March
I, 2003 at GC2. The Skid 18 LP compressor shutdown because of a high level
on the knockout vessel which in turn initiates a stop production for that
part of the facility. The incoming rate to the plant was immediately reduced
from 1 BCFPD to 450 MMSCFPD and flaring was initiated off of the 3rd stage
vessels. Assist gas was started to prevent black smoke. The compressor was
down for 3 hrs, 16 mins and 681 MSCF was flared while repeated attempts were
made to restart the machine. After restart, the machine was shut back down
due to excessive noise. The machine was down a 2nd time for 1 hr and 24 mins
and 292 MSCF was flared. Total flare time was 4 hours and 40 minutes. Total
flare volume was 973 MSCF.
>
> If you require additional information,
please don't hesitate to call me.
>
>
>
>
>
>
Michael Bolkovatz
GPB production Optimization TL
659-4472, 659-5566
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 04/2003
GATHERING CENTER 2
Disposition Volume MCF"
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 1,909
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 25,079
6. Used for lease operations Fuel 657,298
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 684,286
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 19,171,357
Remarks:
I hereby ceQ¡that Re foregoing is true and correct to the best of my knowledge.
Signature: . O. ..A A ~ Title: SUPERVISOR
Form 10-422 (Revised 4/95)
"Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BA Y UNIT - GC-2
GAS FLARING INCIDENT REPORT
April 2003
Page 1
~UnP/anned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
4/5/2003 1850-1858 56 Not required for unplanned events which
4/7/2003 0000-0010 69 are less than or equal to 1 hour
4/13/2003 1557-1613 267
4/13/2003 2122-2144 183
4/14/2003 1235-1244 69
4/14/2003 1340-1356 333
4/14/2003 1632-1654 275
4/16/2003 2036-2045 31
4/17/2003 1510-1514 56
4/18/2003 0118-0147 101
4/18/2003 2257-2302 35
4/25/2003 2210-2352 350
4/26/2003 0150-0159 38
4/26/2003 0811-0818 29
4/28/2003 0205-0345 17 Intermittent, 29 min
TOTAL
1,909
ACTlONTAKEN TO EUMINATe CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
~Unplanned Events greater than 1 hour
DATE TIME VOLUME
DESCRIPTION OF INCIDENT & CAUSE
See Attachments
ACTION TAKEN TO EUMINATE CAUSE
See Attachments
TOTAL
o
ACTION TAKEN TO EUMINATE CAUSE
See Attachments
~Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL
o
ACTION TAKEN TO EUMINATE CAUSE
See Attachments
~Planned Events Exceeding 1 Hour OR Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5.000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
TOTAL
1,909
o
o
o
26.988
5/7/2003
3:49 PM
GATHERING CENTER 2
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator I Field(s) I Month/Year of Disposition
I BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU OS/2003
Facility
Disposition Volume MCF" "Indicate contribution of each pool to total.
1. Sold 0 Pool Name Code Percent
2. Reinjected 0 PRUDHOE 640150 100.00%
3. Flared or vented less than 1 hour. 783
4. Flared or vented greater than 1 hour 4,743 ¡/
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 25,954
6. Used for lease operations Fuel 661,865
Assist 0
7. Other Lift Gas, Off Field 0 btfir' i»
i
TOTAL items 1 - 7 693,345 1. Safety +74'3 MCF
f
8. NGL gas equivalent produced 0 2. Lease Use MCF
9. Purchased gas 0 3. Conserv. Purposes MCF
.#'
10. Transferred from: 0 ~~ 7/3/ß
~>
Commissioner Date
11. Transferred to: CCP 19,220,197
Note: All volumes must be corrected to pressure of 14.65
Remarks: psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
I hereby certtzthat tlforegp~ is true and correct to the best of my knowledge. Authority 20 AAC 25.235.
Signature: :Q .A A_Ah. Title: SUPERVISOR
Form 10-422 (Revised 4/95)
3:«--
BP EXPLORATION (ALASKA) INC.
PRUDHOE BA V UNIT - GC-2
GAS FLARING INCIDENT REPORT
May 2003
Page 1
rUnplanned Events less than or equal to 1 hour
OA1'Ë 1'IMË VOIlOMË· . DËSCFtIl>tIONOFINOIOËN'f8tOAUSE
5/9/2003 0242-0306 300 Not required for unplanned events which
5/9/2003 0307-0320 92 are less than or equal to 1 hour
5/11/2003 0948-0955 49
5/12/2003 0930-0939 75
5/15/2003 2315-2319 28
5/21/2003 0240-0244 22
5/21/2003 0950-1002 92
5/23/2003 0026-0038 83
5/23/2003 0123-0129 42
TOTAL
783
~Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
5/19/2003 1300-2359 3,538 Intermittent - See Attachments
5/20/2003 0001-0308 649
5/25/2003 1517-2120 556 Intermittent
TOTAL
4,743
~Planned Events Less Than or Equal 1 Hour AND Not Exceedin~ 5000 Met
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL
o
rPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
4,743
o
o
TOTAL FLARED VOLUME
31,480
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
6/9/2003
11:36AM
REPORT NO: 03-0324
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC2
DATE: 19 May 2003
SYSTEM
1. Flare/Relief Valve
TIME OF FLARING
Start Stop Duration
13:00 23:59 16 Hrs 59 Mins
Black
Intermittent Smoke
~ 0
Planned VOLUME
o 3,538 MSCF
TOTAL VOLUME 3,538 MSCF
First Determination of Cause:
1. Extended flaring event occurred during required ESD testing and start up of LP and IP compressors.
LP and IP compressors use low pressure gas which is dependent on HP gas flow rates.
Action Taken to Stop Flaring:
1. WOA increased HP rates to allow compressors enough gas to start. IP and then LP @ 2215. Assist
gas was used during this process.
Friday, May 23, 2003
Page 1 of 1
REPORT NO: 03-0325
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC2
DATE: 20 May 2003
SYSTEM
1. Flare/Relief Valve
TIME OF FLARING
Start Stop Duration
00:01 03:08 3 Hrs 7Mins
Black
Intermittent Smoke
Planned
o 0
o
VOLUME
649 MSCF
649 MSCF
TOTAL VOLUME
First Determination of Cause:
1. Intermittent flaring event occurred during startup of the LP compressor after the required ESD
testing.
Action Taken to Stop Flaring:
1. WOA increased HP rates to allow compressors enough gas to start. LP started @ 0229.
Friday, May 23, 2003
Page 1 of 1
REPORT NO: 03-0343
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC2
DATE: 25 May 2003
SYSTEM
1. Flare/Relief Valve
TIME OF FLARING
Start Stop Duration
15:17 21 :20 4 Hrs 27Mins
Black
Intermittent Smoke
Planned
~ 0
o
VOLUME
556 MSCF
556 MSCF
TOTAL VOLUME
First Determination of Cause:
1. Produced water leak initated reduction in rate to be able to repair the leak. Sk-18 LP compressor
shut down because of a problem associated with low gas rates in the plant.
Action Taken to Stop Flaring:
1. WOA reduced production rates and shut-in 90 wells equaling 660mmscfd. Wells were shut-in or
choked back starting at 1450 hours.
Tuesday, May 27,2003
Page 1 of 1
GPB Flaring Incident
Subject: GPB Flaring Incident
Date: Tue, 20 May 2003 19:09:50 -0500
From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com>
To: steve _ mcmains@admin.state.ak.us
CC: "Fiedler, Anne M" <FiedleAM@BP.com>, "Benson, Gary A" <BensonGA@BP.com>,
"Pfeiffer, Jim A" <PfeifflA@BP.com>,
"GPB, Environ AdvisorWest" <GPBEnvironAdvisorWest@BP.com>,
"GPB, Environ TL" <GPBEnvironTL@BP.com>,
"GPB, Environ Advisor East" <GPBEnvironAdvisorEast@BP.com>
>
>
steve mcmains@admin.state.ak.us
To:
Steve McMains, AOGCC
>
907-793-1241, fax
907-276-7542
>
>
Team Leader, 907-659-5566
From:
Michael Bolkovatz, GPB Prod Optim
>
> An extended flare incident occurred on May
19-20, 2003 at GC2. The plant was shutdown for ESD testing. The LP & IP
compressors compress gas from the 2nd and 3rd stage vessels. Because of the
reduced flow through the facility, these compressors did not have enough gas
to stay running and in order to prevent overpressuring the vessels, the only
option is for this gas to be flared (this automatically occurs as the vessel
pressure increases). Additional gas rate was put back online until enough
gas rate was flashing off of the 2nd and 3rd stage vessels to keep the IP &
LP compressors online. Total flare time was 20 hours and 6 minutes, total
flare volume was 4187 MSCF.
>
>
If you require additional information,
please don't hesitate to call me.
>
>
>
>
>
>
>
Michael Bolkovatz
GPB production Optimization TL
659-5566
I of I
5/21/20036:06 AM
GPB Flaring Incident
Subject: GPB Flaring Incident
Date: Mon, 26 May 2003 17:40:10 -0500
From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com>
To: steve _ mcmains@admin.state.ak.us
cc: "Fiedler, Anne M" <FiedleAM@BP.com>, "Benson, Gary A" <BensonGA@BP.com>,
"Pfeiffer, Jim A" <PfeiffJA@BP.com>,
"GPB, Environ Advisor West" <GPBEnvironAdvisorWest@BP.com>,
"GPB, Environ TL" <GPBEnvironTL@BP.com>,
"GPB, Environ Advisor East" <GPBEnvironAdvisorEast@BP.com>
>
>
steve mcmains@admin.state.ak.us
To:
Steve McMains, AOGCC
>
907-793-1241, fax
907-276-7542
>
>
Team Leader, 907-659-5566
From:
Michael Bolkovatz, GPB Prod Optim
>
> An extended flare incident occurred on May
25, 2003 at GC2. The produced water section of the plant was shutdown due to
a corrosion failure on the discharge piping. When this occurred, all of the
produced water flow had to be shutin, 90 wells and 660 MM/D was shut in. As a
result, there was not enough gas off of the 2nd and 3rd stage vessels to
keep the LP & IP compressors loaded and running the full time. After the
initial rate was shutin, we moved dry wells from LP to HP, and from GCl HP
to GC2 HP to keep enough gas flashing off of the final stage separators to
keep the LP and IP compressors running. Total flare time was 4 hours and 27
minutes (note, there was intermittent flaring during this period, most of
the time the IP & LP compressors were running) , total flare volume was 556
MSCF.
>
> If you require additional information,
please don't hesitate to call me.
>
>
>
>
>
>
>
Michael Bolkovatz
GPB production Optimization TL
659-5566
1 of!
5/27/20037:16 AM
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) MonthlYear of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 06/2003
GATHERING CENTER 2
Disposition Volume MCF" "Indicate contribution of each pool to total.
1. Sold 0 Pool Name Code Percent
2. Reinjected 0 PRUDHOE 640150 100.00%
3. Flared or vented less than 1 hour. 88
4. Flared or vented greater than 1 hour 513 v
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 26,769
6. Used for lease operations Fuel 615,032
Assist 0
7. Other Lift Gas, Off Field 0 .........< <....................<
<... ........< .................. < «
TOTAL items 1 - 7 642,402 1. Safety :5'J3 MCF
8. NGL gas equivalent produced 0 2. Lease Use MCF
9. Purchased gas 0 3. Conserv. Purposes MCF
l,..o-... .#'
10. Transferred from: 0 ~/A -zþ¡þ
'V......, .V / Date· .
Commissioner
11. Transferred to: CCP 19,066,236
Note: All volumes must be corrected to pressure of 14.65
Remarks: psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
I hereby cety.(jt re fOregOi~9 is true and correct to the best of my knowledge. Authority 20 AAC 25.235.
Signature: . . 1 ~ ^"'^ 1J. Title: SUPERVISOR
Form 10-422 (Revised 4/95)
~¡C-
BP EXPLORATION (ALASKA) INC.
PRUDHOE BA V UNIT· GC-2
GAS FLARING INCIDENT REPORT
June 2003
rUnplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
6/9/2003 0846-0900 88 Not required for unplanned events which
are less than or equal to 1 hour
Page 1
TOTAL
88
~Unplanned Events ~reater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
6/2/2003 1012-2359 267 Intermittent - See Attachments
6/3/2003 0001-0310 246
Intermittent
TOTAL
513
~Planned Events Less Than or Equal 1 Hour AND Not Exeeedin~ 5000 Mef
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL
o
rPlanned Events Exceeding 1 Hour OR Exceeding 5000 Met
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
513
o
o
TOTAL FLARED VOLUME
27,370
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
7/9/2003
1:59 PM
FACILITY: GC2
SYSTEM
1. Flare/Relief Valve
REPORT NO: 03-0352
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 02 Jun 2003
TIME OF FLARING
Start Stop Duration
10:12 23:59 2Hrs 8Mins
Black
Intermittent Smoke
~ 0
TOTAL VOLUME
o
First Determination of Cause:
1. Sk-18 IP compressor shut down because of a problem associated with
water plant shutdown.
Action Taken to Stop Flaring:
1. Cut all LP rate and kept the very dryest HP wells flowing.
Thursday, June 26, 2003
Planned
VOLUME
267 MSCF
267 MSCF
Page 1 of 1
bp
FACILITY: GC2
SYSTEM
1. Flare/Relief Valve
REPORT NO: 03-0354
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 03 Jun 2003
TIME OF FLARING
Start Stop Duration
00:01 03:10 1 Hrs 58Mins
Black
Intermittent Smoke
~ 0
TOTAL VOLUME
o
First Determination of Cause:
1. Sk-18 IP compressor shut down because of a problem associated with
water plant shutdown.
Action Taken to Stop Flaring:
1. Cut all LP rate and kept the very dryest HP wells flowing.
Thursday, June 26, 2003
Planned
VOLUME
246 MSCF
246 MSCF
Page 1 of 1
~.H U da1Jug Incident
Subject: GPB Flaring Incident
Date: Sat, 7 Jun 2003 16:26:21 -0500
From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com>
To: steve _ mcmains@admin.state.ak.us
CC: "Fiedler, Anne M" <FiedleAM@BP.com>, "Benson, Gary A" <BensonGA@BP.com>,
"Pfeiffer, Jim A" <PfeiffJA@BP.com>,
"GPB, Environ Advisor West" <GPBEnvironAdvisorW est@BP . com>,
"GPB, Environ TL" <GPBEnvironTL@BP.com>,
"GPB, Environ Advisor East" <GPBEnvironAdvisorEast@BP.com>
To:
Steve McMains, AOGCC
steve mcmains@admin.state.ak.us
907-793-1241, fax 907-276-7542
From:
Hal Tucker, GPB Prod Optim Team Leader, 907-659-4472
An extended flare incident occurred on June 02, 2003 at GC2. The
produced water section of the plant was shutdown due to a low level in the
surge drum. Following the shut down, a flange leak developed in the produced
water header relief piping. As a result of being unable to re-start the
produced water section until the flange leak was repaired, the surge tank
level climbed to maximum as all high water cut wells were being shut in.
That production cut caused the IP and LP compressors to trip due to low gas
volumes. Once the surge tank level stabilized we begin to re-establish
enough dry production to re-start the IP and LP compressors. Total flare
time was 4 hours and 8 minutes, total flare volume was 513 MSCF.
If you require additional information, please don't hesitate to call
me.
Hal Tucker
GPB Production Optimization TL
659-4472
I of I
6/9/2003 5:49 AM
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 07/2003
GATHERING CENTER 2
Disposition Volume MCF"
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 21,186
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 27,078
6. Used for lease operations Fuel 618,443
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 666,707
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 19,042,234
Remarks:
I hereby ce~that t4oing, true and correct to the best of my knowledge.
Signature: 0 ,A I J Title: SUPERVISOR
.
Form 10-422 (Revised 4/95)
"Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BA V UNIT - GC-2
GAS FLARING INCIDENT REPORT
July 2003
Page 1
~~~Planned Events less than or equal to 1 hour
DATE·· .. ......... ... ... .. ··TIME ...... ... .... ..... .... ···V.OtUME . ·~!>çf't!~º"'º!",I",çlºg"'!/"Jç~º$EYr
7/1/2003 2114-2120 42 Not required for unplanned events which
7/8/2003 2144-2150 42 are less than or equal to 1 hour
7/10/2003 1338-1342 8
7/14/2003 2146-2246 12,889
7/21/2003 0901-0915 3,889
7/23/2003 0227-0324 3,958
7/24/2003 0849-0854 52
7/29/2003 0227-0312 250
7/29/2003 0313-0329 56
TOTAL
21,186
Un lanned Events reater than 1 hour
. ACTION TAKEN TO ELIMINATE CAUSE·
Not required for unplanned events which
are less than or equal to 1 hour
Intermittent -
See Attachments
Jl;Merfflittt:fI~.
TOTAL
o
JPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Met
. DATE TIME· VOLUME DESCRIPTION OF INCIDI:NT & CAUSE
See Attachments
TOTAL
o
rPlanned Events Exceedin~ 1 Hour OR Exceeding 5000 Met
DATE·· . . TIME VOLUME. DESCRIPTION OF INCIDENT & CAUSf.
See Attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
o
o
o
TOTAL FLARED VOLUME
48,264
ACTION tAKEN TO ELIMINAtE CAUSE ..
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE .
See Attachments
8/11/2003
1 :36 PM
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 08/2003
GATHERING CENTER 2
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 4,264
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 23,599
6. Used for lease operations Fuel 647,967
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 . 7 675,830
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 20,739,887
Remarks:
I hereby ceL¿that tht.regOing lf~ue and correct to the best of my knowledge.
Signature: .0. ..Á ..I AA d 1 Title: SUPERVISOR
- ,
Form 10 422 (Revised 4/95)
"Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE SAY UNIT· GC-2
GAS FLARING INCIDENT REPORT
August 2003
Page 1
~Unplanned Events less than or equal to 1 hour
DATE·· .. .. ... ... TIME.·· . . . VOLUME .·DESCRIPTION OF INCIDENT & CAUSE .. .
8/8/2003 1610-1655 3,906 Not required for unplanned events which
8/9/2003 2311-2316 35 are less than or equal to 1 hour
8/14/2003 1406-1437 323
TOTAL
4,264
Unplanned Events reater than 1 hour
ACTION. TAKEN TO. ELIMINATE CAUSE .. ... ..
Not required for unplanned events which
are less than or equal to 1 hour
Intermittent - See Attachments
See Attachments
f ntermittent
TOTAL
o
.~
JPlanned Events Less Than or E'Iual1 Hour AND Not Exeeedin~ 5000 Met
.... DATE· . . ··TIME . . 'VOLUME . . . DeSCRIPTION 01=' INCIDENT & CAUSE ...
See Attachments
TOTAL
o
IPlanned Events Exeeedin!:J 1 Hour OR Exeeedin~ 5000 Met
. DATE.·· .. . . . TIME .. . VOLUME . DESCRIPTION OF INCIDEI'iT & CAUSE
See Attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
o
o
o
TOTAL FLARED VOLUME
27,863
ACTION TAKEN 10 EUMINATECAUSE . ....
See Attachments
. ACTIOf'fTAKEN TO ELI"IINATECAuse . .
See Attachments
9/9/2003
9:01 AM
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 09/2003
acility
GATHERING CENTER 2
"Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
Disposition Volume MCF"
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 478
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 21,715
6. Used for lease operations Fuel 628,852
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 651,045
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 19,571,126
Remarks:
I hereby cert~~hat :r fOregOinþi~ true and correct to the best of my knowledge.
Signature: ~O. J A ' ø , Title: SUPERVISOR
-
:': .i.,.··...·,{
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
Form 10 422 (Revised 4/95)
BP EXPLORATION (ALASKA) INC.
PRUDHOE BA V UNIT· GC-2
GAS FLARING INCIDENT REPORT
September 2003
ual to 1 hour
9/7/2003
9/8/2003
9/11/2003
9/12/2003
9/18/2003
10 Not required unplanned events which
35 are less than or equal to 1 hour
69
156
208
1313-1318
0011-0016
0004-0008
0408-0423
1012-1042
TOTAL
478
~UnPlanned Events ~reater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
Intermittent - See Attachments
Intermittent
TOTAL
o
'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL
o
Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mef
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
o
o
o
22,193
Page 1
Not required events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
1 0/7/2003
10:26 AM
v HH.;lU......Ill
Subject: GPB Flaring Incident
Date: Fri, 10 Oct 200300:53:45 -0500
From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com>
To: steve _ mcmains@admin.state.ak.us
CC: "Fiedler, Anne M" <FiedleAM@BP.com>, "Benson, Gary A" <BensonGA@BP.com>,
"Pfeiffer, Jim A" <PfeiffJA@BP.com>,
"GPB, Environ Advisor West" <GPBEnvironAdvisorWest@BP.com>,
"GPB, Environ TL" <GPBEnvironTL@BP.com>,
"GPB, Environ Advisor East" <GPBEnvironAdvisorEast@BP.com>
>
>
>
>
>
907-659-5566
To:
Steve McMains, AOGCC
steve mcmains@admin.state.ak.us
907-793-1241, fax 907-276-7542
From:
Michael Bolkovatz, GPB Prod Optim Team Leader,
>
> An extended flare event occurred on October 9, 2003. GC2
experienced a plant upset which caused D Bank to shutdown. This in turn
caused the LP & IP compressors to shutdown at midnight due to reduced gas
rate. The IP compressor was restarted at 03:56. Shutting in additional rate
would have reduced the gas available to this compressor and would have
prolonged the restart & lengthened the time of flare. The LP compressor was
restarted after 08:40, then it shutdown again at 09:49 and finally restarted
and stayed running at 11:50. Volume flared from midnight to 08:40 was 5417
MSCF and the volume flared from 09:49 to 11:50 was 1260 MSCF for a total of
6677 MSCF.
>
>
to call me.
>
>
>
>
>
>
>
>
If you require additional information, please don't hesitate
Michael Bolkovatz
GPB Production Optimization TL
659-5566
of}
} OJ} 0/2003 6:55 AM
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 10/2003
GATHERING CENTER 2
Disposition Volume MCF"
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 7,767
4. Flared or vented greater than 1 hour 7,977 /
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 22,450
6. Used for lease operations Fuel 588,512
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 626,706
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 15,714,021
Remarks:
I hereby cee¿ that t! fOregOi] is true and correct to the best of my knowledge.
Signature: .... () .A.......... 1 t Title: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name
Code
Percent
PRUDHOE
100.00%
640150
1. Safety
tt(77MCF ~
2. Lease Use
MCF
3. Conserv. Purposes
MCF
[
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-2
GAS FLARING INCIDENT REPORT
October 2003
Page 1
IUnplanned Events less than or e9ual to 1 hour
DATE TIME VOLUME·· . DESCRIPTION OF INCIDENT&: CAUSE
10/212003 0646-0656 174 Not required for unplanned events which
10/4/2003 1743-1759 300 are less than or equal to 1 hour
10/4/2003 1858-1910 125
10/6/2003 0621-0634 135
10/6/2003 0825-0835 70
1016/2003 1009-1014 35
10/7/2003 1823-1836 90
10/7/2003 2107-2127 139
10/7/2003 2153-2202 63
10/8/2003 0114-0128 97
10/8/2003 0340-0348 56
10/9/2003 2219-2224 11
1 0/25/2003 0020-0032 125
10/27/2003 0200-0220 4,167
10/27/2003 1324-1331 97
10/28/2003 2000-2010 2,083
TOTAL
7,767
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
¡Unplanned Events !;¡reater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
10/9/2003 0000-0840 5,417 See Attachments
10/9/2003 0949-1150 1 ,260
10/31/2003 0200-1155 1,300 Intermittent
TOTAL
7,977
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
Iplanned Events Less Than or Equal 1 Hour AND Not ExceedinJ 5000 Mct
DATE TIME VOLOME DESCRIPTION OFINCIDENT 8. CAUSE
See Attachments
TOTAL
o
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
¡Planned Events Exceedinll1 Hour OR Exceedin!il5000 Met
DATE TIME· VOLUME DESCRIPTION OF INCIDENT 8. CAUSE
See Attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
7,977
o
o
38,194
ACTION TAKEN TO ELIMINATE CAUSE .
Not required for unplanned events which
are less than or equal to 1 hour
11/7/2003
1:51 PM
FACILITY: GC2
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
3. Flare/Relief Valve
REPORT NO: 03-0571
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 09 Oct 2003
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME ./
00:00 08:40 8Hrs 40Mins 0 0 0 5,417 MSCF j
09:49 11:50 2Hrs 1 Mins 0 0 0 1 ,260 MSCF
22:19 22:24 OHrs 5Mins 0 0 0 ll. MSCF
TOTAL VOLUME 6,688 MSCF
First Determination of Cause:
1. Sk-18 I P/LP compressor shut down because of a problem associated with "0" bank shutdown.
2. Sk-18 LP compressor shut down because of a problem associated with not enough gas rate through
the GC.
3. Low oil rates through GC caused the LPcompressor:s.t05urge.
Action Taken to Stop Flaring:
1. Flaring was permitted to continue while GC operations personnel attempted to restart the
equipment. IP compressor was restarts at 03:56 hrs. LP compressor was restarted at 08:40 hrs.
2. Equipment was restarted at 11 :50 hours. Gas rate was increased following card change out for TEG
reboilers.
3. Pressure on V-220 was raised to increase suction pressure to LP machines
Tuesday, October 21, 2003
Page 1 of 1
REPORT NO: 03-0608
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC2
DATE: 31 Oct 2003
TIME OF FLARING Slack
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 02:00 11 :55 3 Hrs 10 Mins ~ 0 0 1,300 MSCF
TOTAL VOLUME 1,300 MSCF
First Determination of Cause:
1. Compressor loading problem due to plant start-up and low gas rates. Assist gas was used to
prevent black smoke.
Action Taken to Stop Flaring:
1. Brought up plant and restarted compressors
Monday, November 03, 2003
Page 1 of 1
..
Facility
GATHERING CENTER 2
Disposition
1. Sold
2. Reinjected
3. Flared or vented less than 1 hour.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 11/2003
Volume MCF"
o
o
1,007
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
12,500 ¡,.../".
5. Pilot and Purge
6. Used for lease operations
7. Other
TOTAL items 1 - 7
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to: CCP
Remarks:
I hereby ce
22,159
Fuel
Assist
645,328
o
Lift Gas, Off Field
o
680,994
o
o
o
18,092,390
g is true and correct to the best of my knowledge.
Title: SUPERVISOR
"Indicate contribution of each pool to total.
Pool Name
Code
Percent
PRUDHOE
640150
100.00%
1. Safety
IZ{ ':;-00 MCF (il),<-
2. Lease Use
MCF
MCF
~
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BA V UNIT - GC-2
GAS FLARING INCIDENT REPORT
November 2003
Page 1
lunPlanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
11/7/2003 2130-2159 1,007 Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
1,007
lunplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
11/19/2003 0505-1205 12,500 See Attachments
TOTAL
12,500
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL
o
Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
12,500
o
o
TOTAL FLARED VOLUME
35,666
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
12/5/2003
10:27 AM
REPORT NO: 03-0642
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC2
DATE: 19 Nov 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 05:05 12:05 7Hrs OMins ~ 0 0 12,500 MSCF
TOTAL VOLUME'12;50ß''MSCf
First Determination of Cause:
1. Power failure in PWX section
Action Taken to Stop Flaring:
1. Cut gas / water rate to GC-2 , 500mm, assist gas was used to control black smoke
Thursday, November 20,2003
Page 1 of 1
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 12/2003
GATHERING CENTER 2
Disposition Volume MCP
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 167
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 21,133
6. Used for lease operations Fuel 727,166
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 748,466
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 20,089,652
Remarks:
I hereby cert!:)hat thl fOregOin1 true and correct to the best of my knowledge.
Signature: . Q. ÁÅ AA 1 } Title: SUPERVISOR
Form 10-422 (Revised 4/95)
"Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-2
GAS FLARING INCIDENT REPORT
December 2003
Page 1
Unplanned Events less than or equal to 1 hour
12/22/2003
0658-0718
167 Not required for unplanned events which
are less than or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
167
Iunplanned Events greater than 1 hour
DATE . TIME VOLUME
DESCRIPTION OF INCIDENT & CAUSE
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
TOTAL
o
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
See Attachments
See Attachments
TOTAL
o
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mct
'DATE . TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE .
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
167
o
o
o
21,300
1/6/2004