HomeMy WebLinkAboutPBU GC 3 / BP Exploration
STATE OF ALASKA
AOGCC
GAS DISPOSITION FILES
YEAR: 2003
FACILITY: PBU GC 3
OPERATOR: BP EXPLORATION
(ALASKA) IN C
GATHERING CENTER 3
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
I Operator I Field(s) I Month/Year of Disposition
I BP EXPLORATION, ALASKA IWESTERN OPERATING AREA-PBU I 01/2003
Facility
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
1. Sold
o
Pool Name
Code
Percent
2. Reinjected
o
PRUDHOE
640150
100.00%
3. Flared or vented less than 1 hour.
2,833
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
229
5. Pilot and Purge
19,358
6. Used for lease operations
Fuel
Assist
534,708
o
7. Other
Lift Gas, Off Field
o
TOTAL items 1 - 7
557,128
1. Safety
Z.Zcr MCF (113«...
8. NGL gas equivalent produced
o
2. Lease Use
MCF
9. Purchased gas
o
3. Conserv. Purposes
MCF
10. Transferred from:
o
Æ~~ L ~ "---
Commissioner Date
11. Transferred to: CCP
28,680,637
I hereby ce
Signature:
Form 10-422 (Revised 4/95)
true and correct to the best of my knowledge.
Title: SUPERVISOR
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
Remarks:
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
January 2003
Junplanned Events less than or equal to 1 hour
DATE TIME VOLUME GF;SCR,pTtONioFINcIDeNTi¥<iCAUSE
1/8/2003 0232-0304 111 Not required for unplanned events which
118/2003 1324-1358 240 are less than or equal to 1 hour
1/11/2003 0533-0604 323
1/13/2003 1445-1453 56
1/15/2003 1110-1115 35
1/16/2003 2151-2157 50
1/18/2003 0625-0640 104
1/19/2003 0936-0957 219
1/20/2003 0407-0412 49
1/21/2003 0115-0129 204
1/2212003 1321-1358 514
1/2312003 2051-2110 198
1/24/2003 0557-0621 333
1/25/2003 0917-0921 36
1/26/2003 1718-1728 104
1/27/2003 0358-0435 257
Page 1
-
TOTAL
2,833
~unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
1/27/2003 2203-2314 229 See Attachments
TOTAL
229
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
ACTION TAKEN TO EUMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO EUMINATE CAUSE
See Attachments
TOTAL
o
ACTION TAKEN TO EUMINATE CAUS
See Attachments
Planned Events Exceeding 1 Hour OR Exceedin 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
229
o
o
22,420
ACTION TAKEN TO EUMINATE CAUSE
See Attachments
217/2003
9:25 AM
REPORT NO: 03-0063
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 27 Jan 2003
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
03:58 04:35 OHrs 37 Mins 0 0 0 257 MSCF
22:03 23:14 1 Hrs 11 Mins ~ 0 0 229 MSCF
TOTAL VOLUME 486 MSCF
First Determination of Cause:
1. Due to rising ambient temps and gas transit line pressure, A HP separator flared.
2. Due to rising ambient temps and gas transit line pressure, A HP separator flared.
Action Taken to Stop Flaring:
1. Four wells chokes were reduced to minimum, equal 60mmscfpd gas rate. Flaring stopped.
2. Four wells chokes were reduced to minimum, equal to 60mmscfpd gas rate. Flaring stopped.
Tuesday, January 28, 2003
Page 1 of 1
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 02/2003
GATHERING CENTER 3
Disposition Volume MCF*
1, Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 806
4, Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25,235)
5. Pilot and Purge 16,311
6. Used for lease operations Fuel 503,419
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 520,536
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 26,024,960
Remarks:
I hereby certD_that tT fOregOin~iS true and correct to the best of my knowledge.
Signature: ~(\ 1 J ANI 11 Title: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name
Code
Percent
PRUDHOE
640150
100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
February 2003
Page 1
~Unplanned Events less than or equal to 1 hour
. DATE· .. TIME.·· . . ... . VOLUME DE$CRIPTlON OF INCIDENT & CAUSE .
... ..... .. .".......,..",.........,..,.......,..",.........".,.......,.,,,.-.....,..".....,...,."........".,_......"."_.....".,....,...,,. ,,,...,,,,........,,. .....
2/25/2003 0707-0721 778 Not required for unplanned events which
2/28/2003 0420-0424 28 are less than or equal to 1 hour
. ACTION TAKEN TO ELIMINATE CAUSE ...
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
806
See Attachments
See Attachments
TOTAL
o
~Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE . TIME· VOLUME DESCRIPTION OF INCIDENT & CAUSE .
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
f
TOTAL
o
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
See Attachments
See Attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
806
o
o
o
TOTAL FLARED VOLUME
17,117
3/7/2003
3:33 PM
GATHERING CENTER 3
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
perator Field s) Month/Year of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 03/2003
Facility
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
1. Sold
o
Pool Name
Code Percent
2. Reinjected
o
PRUDHOE
640150 100.00%
3. Flared or vented less than 1 hour.
3,737
3,655
5. Pilot and Purge
18,398
6. Used for lease operations
Fuel
Assist
533,500
o
7. Other
Lift Gas, Off Field
o
TOTAL items 1 -7
559,290
1. Safety
5,.(,'55 MCF:JÉf'-
8. NGL gas equivalent produced
o
2. Lease Use
MCF
9. Purchased gas
o
3. Conserv. Purposes
MCF
,
10. Transferred from:
o
/ê--fj ~d--~
Commissi er
5/81°3
.
Date
11. Transferred to: CCP
28,035,695
Remarks:
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
Signature:
Form 10-422 (Revised 4/ 5)
Title: SUPERVISOR
BP EXPLORATION (ALASKA) INC.
PRUDHOE SAY UNIT· GC-a
GAS FLARING INCIDENT REPORT
March 2003
lunplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
3/1/2003 0200-0204 42 Not required for unplanned events which
3/1/2003 0225-0230 35 are less than or equal to 1 hour
3/3/2003 0250-0255 69
3/6/2003 1145-1245 1,667
3/6/2003 1626-1638 167
3/1 0/2003 0335-0341 83
3/13/2003 0315-0330 45
3/13/2003 1155·1231 215
3/16/2003 1233-1250 177
3/18/2003 0517-0531 146
3/18/2003 0850-0855 52
3/21/2003 1356-1400 50
3/23/2003 1535-1539 100
3/28/2003 0205-0221 167
3/28/2003 2128-2135 97
3/29/2003 2014-2020 625
Page 1
TOTAL
3,737
~unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
3/1212003 1930-2400 806 See Attachments
3/13/2003 0000-0156 346
3/30/2003 0140-0323 2,503
TOTAL
3,655
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION.OF INCIDENT & CAUSE
See Attachments
TOTAL
o
JPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OFINCIDENT & CAUSE
See Attachments t
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
TOTAL
3,737
3,655
o
o
25,790
ACTION TAKEN TO EUMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO EUMINATE CAUSE
See Attachments
ACTION TAKEN TO EUMINATE CAUSE
See Attachments
ACTION. TAKEN TO ELIMINATE CAUSE
See Attachments
4/812003
11:41 AM
REPORT NO: 03-0134
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 12 Mar 2003
SYSTEM
1. Flare/Relief Valve
TIME OF FLARING
Start Stop Duration
19:30 24:00 4Hrs 30Mins
Black
Intermittent Smoke
Planned
o 0
o
VOLUME
806 MSCF
806 MSCF
TOTAL VOLUME
First Determination of Cause:
1. K5500 Shut Down due to PCM132A Glitch.
Action Taken to Stop Flaring:
1. Flaring was permitted to continue while GC operations personnel attempted to restart the equipment.
K5500 did not restart in time alloted per procedure so at 2330 Choked to minimum 28 wells equaling
220mmscf/d.
Monday, March 31, 2003
Page 1 of 1
REPORT NO: 03-0135
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3 DATE: 13 Mar 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 00:00 01:56 1 Hrs 56 Mins 0 0 0 346 MSCF
2. Flare/Relief Valve 03:15 03:30 OHrs 15 Mins 0 0 0 45 MSCF
3. Flare/Relief Valve 11:55 12:31 OHrs 31 Mins ~ 0 0 215 MSCF
TOTAL VOLUME 606 MSCF
First Determination of Cause:
1. K-5500 SID due to instrumentation problem.
2. K-5500 SID due to instrumentation problem
3. High gas transit line pressure caused by CCP compressor problems due to 6 degree increase in
temperature.
Action Taken to Stop Flaring:
1. Reduced production on 28 wells until K-5500 was restarted.
2. Corrected instrumentation problem and restarted K-5500
3. CCP loaded 1878 tandem compressor and flaring ceased.
Monday, March 31, 2003
Page 1 of 1
REPORT NO: 03-0156
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 30 Mar 2003
SYSTEM
1. Flare/Relief Valve
TIME OF FLARING
Start Stop Duration
01 :40 03:23 1 Hrs 43Mins
Black
Intermittent Smoke
o 0
Planned VOLUME
o 2,503 MSCF
TOTAL VOLUME 2,503 MSCF
First Determination of Cause:
1. GC shut down due to lPS/PlC malfunction. Extended flaring event occurred while awaiting GC
operator/maintenance to restart compressors/ plant.
Action Taken to Stop Flaring:
1. All rate was shut in to GC-3 until repairs were made to PLC. (Replaced data highway) Rate started
back to plant for compressor restart.Problems with compressor restart delayed start up. Turbine
techs called out to assist with start up.
Monday, March 31, 2003
Page 1 of 1
GPB Flaring Incident
Subject: GPB Flaring Incident
Date: Sun, 30 Mar 2003 19:15:30 -0600
From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com>
To: steve_mcmains@admin.state.ak.us
CC: "Fiedler, Anne M" <FiedleAM@BP.com>, "Benson, Gary A" <BensonGA@BP.com>,
"Pfeiffer, Jim A" <PfeiffJA@BP.com>,
"GPB, Environ Advisor West" <GPBEnvironAdvisorWest@BP.com>,
"GPB, Environ TL" <GPBEnvironTL@BP.com>,
"GPB, Environ Advisor East" <GPBEnvironAdvisorEast@BP.com>
>
>
steve mcmains@admin.state.ak.us
>
907-276-7542
>
>
Team Leader, 907-659-4472
To:
Steve McMains, AOGCC
907-793-1241, fax
From:
Michael Bolkovatz, GPB Prod Optim
>
> An extended flare incident occurred on March
30, 2003 at GC3. The entire plant shutdown due to a PLC (process logic
controller) failure. After the PLC was repaired, the Operators started
reestablishing rate to the plant. One of the LPS compressors would not
restart. Flaring occurred for 1 hr, 43 mins for a total volume of 2,503 MSCF
until the LPS machine was started.
>
> If you require additional information,
please don't hesitate to call me.
>
>
>
>
>
>
>
Michael Bolkovatz
GPB production Optimization TL
659-4472, 659-5566
GPB Flaring Incident
Subject: GPB Flaring Incident
Date: Thu, 13 Mar 200320:12:22 -0600
From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com>
To: steve _ mcmains@admin.state.ak.us
cc: "Fiedler, Anne M" <FiedleAM@BP.com>, "Benson, Gary A" <BensonGA@BP.com>,
"Pfeiffer, Jim A" <PfeifDA@BP.com>,
"GPB, Environ Advisor West" <GPBEnvironAdvisorWest@BP.com>,
"GPB, Environ TL" <GPBEnvironTL@BP.com>,
"GPB, Environ Advisor East" <GPBEnvironAdvisorEast@BP.com>
To: Steve McMains, AOGCC
steve mcmains@admin.state.ak.us
907-793-1241, fax
907-276-7542
From:
Hal Tucker, GPB Prod Optim
Team Leader, 907-659-4472
An extended flare incident occurred
on March 13, 2003 at GC3. K5500 wet gas compressor shut down due to a glitch
from PCM132A.. After 4 hours K5500 still had not restarted so 28 wells were
choked to minimum, per procedure, to reduce flare volume. Total flare time
was 6 hours and 26 minutes, total flare volume was 1152 MSCF.
If you require additional
information, please don't hesitate to call me.
Hal Tucker
GPB production Optimization TL
659-4472, 659-5566
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 04/2003
GATHERING CENTER 3
Disposition Volume MCF*
1, Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour, 728
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 17,367
6, Used for lease operations Fuel 511,585
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 529,680
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 27,505,406
Remarks:
I hereby cert~lJ ttforegOi~,iS true and correct to the best of my knowledge.
Signature: . . - .Å A.... 11 Title: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235,
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
April 2003
Page 1
Not required for unplanned events which
are less than or equal to 1 hour
4/2/2003
4/10/2003
4/14/2003
4/15/2003
4/16/2003
4/29/2003
1200-1205
0012-0026
0106-0120
0350-0356
1516-1552
0623-0632
50 Not required for unplanned events which
97 are less than or equal to 1 hour
204
27
275
75
TOTAL
728
lunplanned Events greater than 1 hour
DATE TIME VOLUME
DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL
o
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Met
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL
o
5000 Met
See Attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
728
o
o
o
TOTAL FLARED VOLUME
18,095
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
See Attachments
517/2003
3:48 PM
GC-3 FlaringlK-5500 Wet Gas Compressor Shutdown Procedure
Page 1 of2
Authority:
Scope:
GPB Operations Manager
GPB
Custodian:
Document
Administrator:
Issuing Dept:
Control Tier:
GPB Optimm.tion Engineer
BPXA HSE Web Specialist
Issue Date:
Revision Date:
Next Review
Date:
April 28, 1999
April 6, 2003
June 3, 2004
Operations
3 -GPB
Purpose
Full compliance at all times with Alaska Oil and Gas Conservation Commission Gas Flaring
Regulations.
General
The Gathering Center 3 (GC-3) and Central Control Room Operators will make every attempt to
minimize and eliminate flaring. Flaring to maintain production is not allowed.
The Control Room Operator will maintain close communications with GC-3 Operators to keep an
updated status of K-5500 and related flaring. The Control Room Operator will coordinate with
GC-3 Operators to ensure that specific actions are taken within established time guidelines. Any
required production rate changes to minimize and eliminate flaring will be coordinated with the
Eastern Operations Center (EOC) to coordinate production rate changes.
Specific Action
In the event of a shutdown of the GC-3 Wet Gas Compressor, K-5500, the following actions will
be taken to minimize flaring:
. If K-5500 shuts down, the flare gas assist valves will remain closed unless black smoke is
observed (black smoke will not nonnally appear with K-5500 flaring). A period of up to one
hour is allowed to restart the compressor or estimate the downtime for repairs. The flare rate
under this mode will be approximately 4.3 MMSCFD.
· If K-5500 has not restarted after one hour, CRC operators will decrease water rate in 10
mbwpd increments over the next four hours, by notifying F5-3 and pipe-lining water to them.
This mode of operation will reduce flaring by approximately 0.6 mmscfd (roughly 3.7
MMSCFD) and will reduce purge gas through the on-line skim tank.
· If K-5500 has not restarted after a total of four hours from when the compressor first shut
down, GC-3 water rates are reduced to 50 MBWD by shutting in high water cut wells and all
produced water is transferred from GC-3 to Flow Station 3. The online skim tank is shut
down and isolated. The produced water surge tank, and the slop oil tank are also shut down.
This eliminates all flared gas from the water handling facility and reduces flared gas volumes
to approximately 2.2 MMSCFD. This mode of operation will be used for an additional three
hours to allow further time for returning K-5500 to operation. Note: During very cold weather
or during phase weather conditions, it may be prudent to continue flaring rather than shutting
in high water cut wells. Shutting the wet wells under extreme conditions could increase the
risk of frozen piping, spills, and personnel exposure. The Offtake TL, Field OTL, GC-3 OTL,
and Operations Manager should discuss the situation before implementing this step.
· If K-5500 has not restarted after a total of seven hours from when the compressor first shut
down, all High Pressure production into GC-3 is shut down, eliminating flared gas from the
condensate associated with high-pressure production. At this point flared gas volumes are
reduced to approximately 1.8 MMSCFD. Production at the Gathering Center is now limited to
relatively dry low-pressure production with all water routed to FS-3.
Control Tier: 3 - GPB Revision Date: 06/0312001
Document Number: UPS-US-AK-GPB-PCC-HSE-DOC-D0346-3 Print Date: 6/1912003
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://alaska.bpweb.bp.com/ems/
GC-3 Flaring/K-SSOO Wet Gas Compressor Shutdown Procedure
Page 2 of 2
. Finally, after a total of twenty-four hours from when the compressor shut down and if start-up
of K-5500 is not expected imminently, the operating mode of the facility will be reviewed and
approved by the Operations Manager.
Approval:
PBU Operations Manager / PBU Production TL
Date Approved
Revision Log
Revision Date Authority Reviser
April 27, 1999 Matt Werner Kelly Eager
June, 1999 Matt Werner PCC Staff
Sept.. 1999 Matt Werner K. Eager
May 8, 2000 Tom French PCC Staff
June 3, 2001 Hal Tucker PCC Staff
April 6,2003 Hal Tucker PCC Staff
Revision Details
Version 1
Update position titles.
Revision of estimated flared gas volumes based
on decommissioning of GFCs and Dirty Water
Tank. Notes on wet well shut in.
Recertification Review
Recertification Review
GC has taken one skim tank (T=8512) out of
service. Revision to cut gas rate with remaining
skim tank.
Control Tier: 3 - GPB Revision Date: 06/03/2001
Document Number: UPS-US-AK-GPB-PCC-HSE-DOC-D0348-3 Print Date: 6/19/2003
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://alaska.bpweb.bp,com/ems/
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU OS/2003
GATHERING CENTER 3
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 7,469
4, Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 18,709
6. Used for lease operations Fuel 547,436
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 573,614
8, NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11, Transferred to: CCP 27,173,132
Remarks:
I hereby cert21öt, t! foregoing ð true and correct to the best of my knowledge.
Signature: . . --Á ~" Title: SUPERVISOR
Form 1 0-422 Revised 4/95 (
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1, Safety
MCF
2. Lease Use
MCF
3. Conserv, Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25,235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
May 2003
Page 1
5/1/2003
5/3/2003
5/4/2003
5/6/2003
5/6/2003
5/6/2003
5/9/2003
5/10/2003
5/11/2003
5/13/2003
5/13/2003
5/13/2003
5/15/2003
5/15/2003
5/15/2003
5/16/2003
5/17/2003
5/17/2003
5/17/2003
5/17/2003
5/18/2003
5/18/2003
5/19/2003
5/19/2003
5/19/2003
5/20/2003
5/25/2003
5/25/2003
0056-0112
1846-1855
1540-1552
0434-0439
0451-0520
1106-1143
0225-0303
0340-0353
0725-0732
1007-1031
1044-1106
1604-1615
0931-0941
0948-0954
2159-2239
1438-1450
0400-0406
0723-0736
1331-1337
1346-1356
0258-0319
0623-0634
0455-0500
0530-0536
1305-1310
0306-0354
0035-0059
2335-2340
278 Not required for unplanned events which
94 are less than or equal to 1 hour
117
42
100
2,235
924
181
49
200
183
92
104
63
472
167
75
226
63
104
394
153
104
63
69
567
333
17
TOTAL
7,469
Not required for unplanned events which
are less than or equal to 1 hour
6/9/2003
11:37 AM
SP EXPLORATION (ALASKA) INC.
PRUDHOE SAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
May 2003
Page 2
See Attachments
See Attachments
TOTAL
o
Planned Events Less Than or Equal 1 Hour AND Not Exeeedin 5000 Mef
See Attachments
See Attachments
TOTAL
o
See Attachments
See Attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
o
o
o
TOTAL FLARED VOLUME
26,178
6/9/2003
11:37 AM
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 06/2003
GATHERING CENTER 3
Disposition Volume MCF* *Indicate contribution of each pool to total.
1. Sold 0 Pool Name Code Percent
2. Reinjected 0 PRUDHOE 640150 100.00%
3. Flared or vented less than 1 hour, 2,478
k
4. Flared or vented greater than 1 hour 1,124 ./
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 11,028
6. Used for lease operations Fuel 329,103
Assist 0
7. Other Lift Gas, Off Field 0 1/> ....... 1Ît1.lthørîza >
Ln. .............<
TOTAL items 1 - 7 343,733 1. Safety ¡ , ... 4- MCF
, I I '-,
8, NGL gas equivalent produced 0 2. Lease Use MCF
9, Purchased gas 0 3. Conserv. purpos/ MCF
~ .-
10. Transferred from: 0 lL) ~4 7A/b
Con1 v-:. ./ I . ,[
miSSioner Date
11. Transferred to: CCP 20,400,765
Note: All volumes must be corrected to pressure of 14,65
Remarks: psia and to a temperature of 60 degrees F, Report due by
the 20th of the month following the month of disposition.
I hereby cert0 t) tt fOregOi] is true and correct to the best of my knowledge. Authority 20 AAC 25,235.
Signature: .). j "^ )J. Title: SUPERVISOR
Form 10-422 (Revised 4/95)
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT· GC-3
GAS FLARING INCIDENT REPORT
June 2003
Page 1
'Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCiDENT & CAUSE
6/7/2003 1658-1735 206 Not required for unplanned events which
6/11/2003 0808-0824 100 are less than or equal to 1 hour
6/11/2003 1530-1535 69
6/13/2003 0806-0812 645
6/13/2003 1314-1322 556
6/13/2003 1409·1425 222
6/13/2003 1604-1616 125
6/14/2003 1434-1439 69
6/24/2003 1512-1532 486
TOTAL
2,478
~UnPlanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
6/7/2003 1500-1658 410 See Attachments
6/7/2003 1750-2130 694
6/7/2003 2130-2359 10
6/8/2003 0001-0915 10
TOTAL
1,124
rPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL
o
rPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
1,124
o
o
14,630
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
7/9/2003
2:00 PM
REPORT NO:
03·
~-
~\R- df
~~
--b ~ WiI\. .h.
- (I Ji.e. ðJ4..
W ßp~
~~t"~
~9J; ~~
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 07 Jun 2003
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
3. Flare/Relief Valve
4. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
15:00 ~8) 1 Hrs 58 Mins ~ ~ 0 410 MSCF
/ ~
r-.¡;¿
~ 17:35 OHrs 37 Mins ~ ~ 0 206 MSCF
1~:3()' 4Hrs 10Mins ~ ~ 0 694 MSCF
(f~ªQ')2~;~~~ 2 Hrs 29Mins ~ ~ 0 10 MSCF
TOTAL VOLUME 1 ,320 MSCF
First Determination of Cause:
1. Starting plant from a planned maintenance shutdown. Flaring occurred to the burn pit while bringing
in minimal rate to allow LPS machi~~~
2. Flaring occurred to allow depressuring C-slugcatcher to equalize inlet SDV for LDE'Ð
3. Flaring occurred off of V320 LP knockout during ~;;f vent gas blowers and K5500 LP
compressor
4. Estimated five to ten percent opacity with sporadic fifteen to thirty second puffs of black smoke. Most
likely from small valve leakage from remaining safe out (volume too small to calculate, estimated at
ten).
Action Taken to Stop Flaring:
1. Started LPS compressor 7001
2. Equalized and opened Inlet to C slugcatcher
3. Started vent gas blowers and K5500 LP compressor
4. Allowed to continue as a SID would have likely caused a bigger black smoke incident. GC3
personnel continue to look for possible leaks to the flare system.
Thursday, June 26, 2003
Page 1 of 1
REPORT NO: 03-0367
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 08 Jun 2003
SYSTEM
1. Flare/Relief Valve
TIME OF FLARING
Start Stop Duration
00:01 09:15 9Hrs 14Mins
Black
Intermittent Smoke
~ ~
Planned
o
VOLUME
10 MSCF
10 MSCF
TOTAL VOLUME
First Determination of Cause:
1. Allowed to continue as a SID would have likely caused a bigger flaring incident. GC3 personnel
continue to look for possible leaks to the flare system. Found the flare valve on C-slug catcher
leaking.
Action Taken to Stop Flaring:
1. Took all production out of C-slugcatcher and the intermittent flaring stopped completely
~/1fJI7
-tk~
r~~?
,
Thursday, June 26, 2003
Page 1 of 1
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 07/2003
GATHERING CENTER 3
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
Disposition Volume MCF*
1, Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 1,572
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 16,282
6. Used for lease operations Fuel 473,063
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 490,917
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11, Transferred to: CCP 27,864,936
Remarks:
I hereby ce~~r; t~orego::p true and correct to the best of my knowledge.
Signature: . . 1 '" ~ I, Title: SUPERVISOR
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
July 2003
Page 1
lunplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
7/1/2003 1129-1132 15 Not required for unplanned events which
7/7/2003 1245-1258 108 are less than or equal to 1 hour
7/7/2003 2028-2036 83
7/8/2003 0434-0437 21
7/8/2003 0532-0539 58
7/10/2003 1512-1532 833
7/24/2003 1256-1300 61
7/26/2003 1020-1040 278
7/28/2003 1844-1855 115
TOTAL
1,572
IUnplanned Events greater than 1 hour
DATE TIME VOLUME
DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL
o
JPlanned Events Less Than or Equal 1 Hour AND Not Exceedin~ 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL
o
Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Met
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
o
o
o
TOTAL FLARED VOLUME
17,854
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE: CAUSE
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
8/11/2003
1 :39 PM
....
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 08/2003
GATHERING CENTER 3
Form 10 422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1, Safety
MCF
Disposition Volume MCF*
1, Sold 0
2. Reinjected 0
3, Flared or vented less than 1 hour. 424
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 15,384
6. Used for lease operations Fuel 487,442
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 . 7 503,250
8, NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 28,684,213
Remarks:
I hereby ceC5.that t~egOing is true and correct to the best of my knowledge.
Signature: ~0 . "/I'&" 0 J 1 Title: SUPERVISOR
- \
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 MC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
August 2003
Page 1
lunplanned Events less than or equal to 1 hour
DATE ..... ...... TIME .. ... . ·VOLUMEDESPRIPTlONOF INCIDENT & CAUSE . .. ....
8/10/2003 0544-0607 160 Not required for unplanned events which
8/13/2003 1940-1946 21 are less than or equal to 1 hour
8/31/2003 1404-1429 243
.... .... ACTlONTAKENTOELIMINATt;PAU~E···
Not required for unplanned events which
are less than or equal to 1 hour
J
TOTAL
424
See Attachments
See Attachments
TOTAL
o
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
See Attachments
See Attachments
TOTAL
o
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
See Attachments
See Attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
o
o
o
TOTAL FLARED VOLUME
15,808
9/9/2003
9:02 AM
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 09/2003
GATHERING CENTER 3
Disposition Volume MCF*
1, Sold 0
2, Reinjected 0
3. Flared or vented less than 1 hour. 10,880
4, Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 13,561
6. Used for lease operations Fuel 468,572
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 493,013
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 27,780,610
Remarks:
I hereby certC¿that tht fOreg~;Vs true and correct to the best of my knowledge,
Signature: w Q..1 .P I Title: SUPERVISOR
-
Form 10 422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1, Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14,65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition,
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC·3
GAS FLARING INCIDENT REPORT
September 2003
Page 1
lunPlanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
9/9/2003 1045-1052 486 Not required for unplanned events <= 1 hr
9/9/2003 1745-1918 359 Intermittent
9/10/2003 1448-1207 330
9/16/2003 1432-1438 42
9/17/2003 2347-2400 451
9/18/2003 0000-0044 1,528
9/19/2003 0752-0800 261
9/20/2003 1638-1654 667
9/22/2003 0533-0537 56
9/22/2003 1437-1516 4,333
9/26/2003 1930-2015 1,406
9/26/2003 2156-2224 778
9/29/2003 1049-1122 183
TOTAL
10,880
IUnplanned Events greater than 1 hour
DATE TIME VOLUME
DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL
o
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL
o
Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
TOTAL
10,880
o
o
o
24,441
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
1 0/7/2003
10:26 AM
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 10/2003
GATHERING CENTER 3
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3, Flared or vented less than 1 hour. 759
4, Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 14,702
6. Used for lease operations Fuel 505,727
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 521,188
8, NGL gas equivalent produced 0
9. Purchased gas 0
10, Transferred from: 0
11. Transferred to: CCP 28,489,676
Remarks:
I hereby cert(}.7\thet:;.going ~ true and correct to the best of my knowledge.
Signature:. A ~.... 1, Title: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
,þ
SP EXPLORATION (ALASKA) INC.
PRUDHOE SAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
October ~03
Page 1
Unplanned Events less than or equal to 1 hour
10/2/2003
1 0/2/2003
10/5/2003
1 0/15/2003
10/15/2003
1 0/19/2003
10/19/2003
10/27/2003
0222-0238
2334-2340
1936-1945
0115-0120
1015-1030
2033-2055
2249-2259
0428-0434
TOTAL
56 Not required for unplanned events <= 1 hr
21
63
35
229
153
139
63
759
Not required for unplanned events which
are less than or equal to 1 hour
lunPlanned Events greater than 1 hour
DATE TIME VOLUME
TOTAL
DESCRIPTION OF INCIDENT & CAUSE
See Attachments
..
o
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
Iplanned Events Less Than or Equal 1 Hour AND Not Exceedin9 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL
o
tPlanned Events Exceeding 1 Hour OR Exceeding 5000 Met
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
o
~.
o
o
o
15,461
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
111712003
1 :52 PM
.
.
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 11/2003
GATHERING CENTER 3
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour, ~,t,b?
4. Flared or vented greater than 1 hour yqt¡'lû
(Supplemental report required - See 20 AAC 25.235)
5, Pilot and Purge 14,300
6. Used for lease operations Fuel 516,761
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 542,244
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 25,259,785
Remarks:
I hereby ce(J.C;~ te fOregO! is true and correct to the best of my knowledge.
Signature: . . A. ". ~ Title: SUPERVISOR
Form 10-422 Revised 4/951l
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
~.
~&a-
1. Safety
9,QZO MCF ~
2. Lease Use
MCF
3. Conserv, Purposes
MCF
1/1/9--
{ Date t '
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
Junplanned Events less than or equal to 1 hour
... .D)%TE . .. .. .. TIME·· . . . VOLUME .. . . DESCRIPTION OF INCIDENT & CAUSE
11/12/2003 0850-0908 175 Not required for unplanned events <= 1 hr
11/14/2003 1306-1330 1,OQO
--- 11/15/2003 0416-0515 /Ü6
- 11/20/2003 2037-2043 46
1'1Þf) ~ ~ 1/21/2003 0920-0941 88
1 { A"
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC·3
GAS FLARING INCIDENT REPORT
November 2003
Page 1
.. ACTION TAKEN TO EUMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
,1.A-85 - I 2-0 3 ~3.-'2-
Oi-
Unplanned Events reater than 1 hour
11/15/2003
11/15/2003
11/15/2003
11/16/2003
11/17/2003
11/18/2003
11/19/2003
0515-0735
0735-1042
1042-2400
0000-2400
0000-2400
0000-2400
0000-1435
360 See Attachments
286
998
2,640
1,800
2,520
1,094
See Attachments
TOTAL ;ßß8"/ tj'1''lð !'lee ...~Z/04-
JPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
. DATE . TIME· . . V()LOME .. . DESCRIPTION Of INCIDENT & CAUSE
See Attachments
ACTION TAt<:ENTO ELIMINATE CAUSE·
See Attachments
TOTAL
o
tPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
. . DATE TIME . . VOLUME DE$CFUPTIONOF INClDENT& CAUSE
See Attachments
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5.000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
ACTION TAKEN TO Et,.IMINATECAUSE . .
See Attachments
TOTAL
o
9.698
o
o
25,483
1 2/5/2003
10:26 AM
REPORT NO: 03-0631
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3 DATE: 15 Nov 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 04:16 05:15 OHrs 59 Mins 0 0 0 176 MSCF I
./ "
2. Flare/Relief Valve 05:15 07:35 2Hrs 20 Mins 0 0 0 560 ''MSCF
3. Flare/Relief Valve 07:35 10:42 3Hrs 7Mins 0 0 0 286 MSCF ./
4. Flare/Relief Valve 10:42 24:00 13Hrs 18 Mins 0 0 0 998 MSCF ./
TOTAL VOLUME "1;'820' 'MSCf
First Determination of Cause:
1. Sk-18 LP compressor K-5500.sbutdown.becauseotcontrol/instrumentation failure ,associated wUh
purge for control panel.
2. K-5500 Shut down
3. K-5500 Shut down.
4. K-5500 Shut down.
Action Taken to Stop Flaring:
1: Flaring was "Permitted' to continuewhifeGO;'Operationspersonnel attempted to restart"the'~t:lipment.
After trouble shooting the compressor woúld not start. Following procedure, the assist gas was
blocked in. Flaring 4.3 mmscfd.
2. Following procedure, started decreasing water rates in 10 mbwpd over the next four hours. At 0735
shut in skim tanks. Flare rate was 3.7 mmscfd.
3. Shut in skim tanks reduced flare rate to 2.2 mmscfd.
4. All HP production was choked to minimum or shut in, reducing flare rate to 1.8 mmscfd. Ambient
was -20 so OTL decided not to shut in all wells. Wells are being cycled off and on for freeze
protection.
Wednesday, November 19, 2003
Page 1 of 1
bp
REPORT NO: 03-0634
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 16 Nav 2003
SYSTEM
1. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned
00:00 24:00 ., Hrs IMins 0 0 0
o
VOLUME
2,640 MSCF
TOTAL VOLUME
J
2,62!:O'MSCF
First Determination of Cause:
1. K-5500 Shut down.
Action Taken to Stop Flaring:
1. All HP production was choked to minimumUf'shut in, reducing flare rate to 1.8 mmscfd. Ambient
was -20 so OTL decided not to shut in all wells. Wells are being cycled off and onJor freeze
protection.
VVednesday, November19,2003
Page 1 of 1
REPORT NO: 03-0637
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 17 Nov 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 00:00 24:00 24 Hrs OMins 0 0 0 1,800 MSCF
TOTAL VOLUME'" 1 ;aOO'MSCF J
First Determination of Cause:
1. K-5500 shut down
Action Taken to Stop Flaring:
1. Skim tanks are blocked in, all HP production was choked to minimum or shut in, reducing flare rate
to 1.8 mmscfd. Ambient was -20 so. OILdec.idecLooUo shut in all wells. HP wells .are.bejog .cycled
on and off for freeze protection.
Wednesday, November 19, 2003
Page 1 of 1
REPORT NO: 03-0638
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 18 Nov 2003
SYSTEM
1. Flare/Relief Valve
TIME OF FLARING Black
Start Stop ~uratio~ Intermittent Smoke
00:00 24:00 ~Hrs .Mins 0 0
Planned
o
VOLUME
2,520 MSCF
2;520'MSCF/
TOTAL VOLUME
First Determination of Cause:
1. K-5500 compressor Shut down. Changing out compressor seal and repairing slide valve.
Action Taken to Stop Flaring:
1. Skim tanks are blocked in, all HP production was choked to minimum or shut in, reducing flare rate
to 1.8 mmscfd. Ambient was -20 so OTL decided not to shut in all wells. HP wells are being çycled
on and off for freeze protection. Assist gas added to prevent black smoke.
VVednesday, November19,2003
Page 1 of 1
REPORT NO: 03-0639
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 19 Nov 2003
SYSTEM
1. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned
00:00 14:35 14Hrs 35Mins [] 0 0
TOTAL VOLUME
VOLUME
1,094 MSCF
1;994'MSOF j
First Determination of Cause:
1. K-5500 compressor Shut down. Changing out compressor seal and repairing slide valve.
Action Taken to Stop Flaring:
1. Skim tanks are blocked in, all HP production was choked to minimum or shut in, reducing flare rate
to 1.8 mmscfd. Ambient was -20 so OTL decided not to shut in all wells. HP wells are being cycled
on and oft for freeze protection. Assist gas added to prevent black smoke.
Thursday, November 20, 2003
Page 1 of 1
Greater Prudhoe Bay Flaring Event
Subject: Greater Prudhoe Bay Flaring Event
Date: Sat, 15 Nov 2003 16:14:43 -0900
From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com>
To: steve_mcmains@admin.state.ak.us
Steve,
Today GC3's wet gas compressor (K5500) shut down unexpectedly due to "loss
of purge in the instrument cabinet". After reviewing the issues that will have to be
dealt with in order to restart K5500, we have determined that the most efficient
course of action is to replace the compressor immediately. In order to restart K5500
in its current condition we would have to open up the compressor to repair a stuck
slide valve. Repairing the stuck slide valve would take, at a minimum, as much time
as replacing the compressor with a strong likelihood of a longer duration. This
course of action will enable us to confidently return the machine to service for the
long term. We had already planned to replace the compressor in the summer of 2004 ~,
due to a slowly deteriorating vibration problem. '
We will follow the agreed procedure for minimizing flared gas during K5500
shut down events. The final step in the procedure calls for full shut down of the
plant if after 24 hours, restart of K5500 is not imminent. The current ambient
temperature is -20F, with the forecast calling for lows between -20F and -30F
through Monday. We feel that the most prudent course of action, under these
conditions, is to allow GC3 to continue to flare (approximately 2 MMSCFPD) in order
to keep the plant partially on line. Our best estimate is that K5500 should be ready
for a restart Monday afternoon.
When K5500 is back on line and the flaring event is over, I will submit a
follow up note.
If you have an questions, please do not hesitate to call me at 659-4472.
Thank you,
Hal Tucker
Greater Prudhoe Bay Production Optimization Team Leader
'1 of 1
11/16/20039:09 AM
FW Grea"ær Prudhoe Bay Flaring Event
Steve,
GC3's K5500 flaring event, which began at 04:16 on 11/15, ended at
14:35 on 11/19. Total flare duration was 106 hours and 19 minutes.
The total flared volume for this event was 9.874 mmscf.
During the four day flare event, technicians had to go back into
K5500 for two separate repairs, once to replace a leaking
compressor mechanical seal and again to repair an excessive lube
oil leak. The mechanical seal failure occurred during the initial
restart attempt on 11/17 and required replacement of the mechanical
seal. The oil leak was discovered prior to the second restart
attempt on 11/18 and required replacement of a compressor slide
valve "0" ring. K5500 was restarted and loaded up on 11/19 and has
been running smoothly since then..
High pressure production wells were cycled on and off periodically
during the four days to prevent flow line freeze up. Additionally,
produced water was stacked in the skim tank and the produced water
pumps brought on briefly each day to warm up injection wells and
lines.
If you have any questions, please do not hesitate to call me at
659-4472.
Thank you,
Hal Tucker
Greater Prudhoe Bay production Optimization Team Leader
-----Original Message-----
From: GPB, Prod Opt TL
Sent: Saturday, November 15, 2003 4:15 PM
To: 'steve mcmains@admin.state.ak.us'
Subject: Greater Prudhoe Bay Flaring Event
Steve,
10f2
11/24/20037:23 AM
FW: Greafer Prudhoe Bay Flaring Event
Today GC3's wet gas compressor (K5500) shut down unexpectedly due
to "loss of purge in the instrument cabinet". After reviewing the
issues that will have to be dealt with in order to restart K5500,
we have determined that the most efficient course of action is to
replace the compressor immediately. In order to restart K5500 in
its current condition we would have to open up the compressor to
repair a stuck slide valve. Repairing the stuck slide valve
would take, at a minimum, as much time as replacing the
compressor with a strong likelihood of a longer duration. This
course of action will enable us to confidently return the machine
to service for the long term. We had already planned to replace
the compressor in the summer of 2004 due to a slowly
deteriorating vibration problem.
We will follow the agreed procedure for minimizing flared gas
during K5500 shut down events. The final step in the procedure
calls for full shut down of the plant if after 24 hours, restart
of K5500 is not imminent. The current ambient temperature is
-20F, with the forecast calling for lows between -20F and -30F
through Monday. We feel that the most prudent course of action,
under these conditions, is to allow GC3 to continue to flare
(approximately 2 MMSCFPD) in order to keep the plant partially on
line. Our best estimate is that K5500 should be ready for a
restart Monday afternoon.
When K5500 is back on line and the flaring event is over, I will
submit a follow up note.
If you have an questions, please do not hesitate to call me at
659-4472.
Thank you,
Hal Tucker
Greater Prudhoe Bay Production Optimization Team Leader
2 óf2
11124/20037:23 AM
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 12/2003
GATHERING CENTER 3
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour, 3,714
4, Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 16,277
6. Used for lease operations Fuel 530,877
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 550,868
8, NGL gas equivalent produced 0
9. Purchased gas 0
10, Transferred from: 0
11. Transferred to: CCP 29,953,478
Remarks:
I hereby certttð th~OregOing ltrue and correct to the best of my knowledge.
Signature: . L -^^ li Title: SUPERVISOR
- ,
Form 10 422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
December 2003
Page 1
Unplanned Events less than or equal to 1 hour
12/4/2003
12/5/2003
12/5/2003
12/5/2003
12/5/2003
12/14/2003
12/19/2003
12/22/2003
12/22/2003
12/24/2003
0110-0115
1004-1011
1448-1508
1521-1551
1821-1829
1154-1224
0623-0630
1442-1456
1548-1605
1320-1326
TOTAL
139 Not required for unplanned events <= 1 hr Not required for unplanned events which
131
1,347
354
28
1,305 are less than or equal to 1 hour
73
194
118
25
3,714
Iunplanned Events greater than 1 hour
DATE TIME VOLUME. DESCRIPTION OF INCIDENT & CAUSE
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
TOTAL
o
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
See Attachments
See Attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
1 Hour OR Exceeding 5000 Mcf
See Attachments
See Attachments
TOTAL
o
3,714
o
o
o
19,991
1/6/2004
3:56 PM