Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPBU GC 3 / BP Exploration STATE OF ALASKA AOGCC GAS DISPOSITION FILES YEAR: 2003 FACILITY: PBU GC 3 OPERATOR: BP EXPLORATION (ALASKA) IN C GATHERING CENTER 3 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION I Operator I Field(s) I Month/Year of Disposition I BP EXPLORATION, ALASKA IWESTERN OPERATING AREA-PBU I 01/2003 Facility Disposition Volume MCF* *Indicate contribution of each pool to total. 1. Sold o Pool Name Code Percent 2. Reinjected o PRUDHOE 640150 100.00% 3. Flared or vented less than 1 hour. 2,833 4. Flared or vented greater than 1 hour (Supplemental report required - See 20 AAC 25.235) 229 5. Pilot and Purge 19,358 6. Used for lease operations Fuel Assist 534,708 o 7. Other Lift Gas, Off Field o TOTAL items 1 - 7 557,128 1. Safety Z.Zcr MCF (113«... 8. NGL gas equivalent produced o 2. Lease Use MCF 9. Purchased gas o 3. Conserv. Purposes MCF 10. Transferred from: o Æ~~ L ~ "--- Commissioner Date 11. Transferred to: CCP 28,680,637 I hereby ce Signature: Form 10-422 (Revised 4/95) true and correct to the best of my knowledge. Title: SUPERVISOR Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Remarks: BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING INCIDENT REPORT January 2003 Junplanned Events less than or equal to 1 hour DATE TIME VOLUME GF;SCR,pTtONioFINcIDeNTi¥<iCAUSE 1/8/2003 0232-0304 111 Not required for unplanned events which 118/2003 1324-1358 240 are less than or equal to 1 hour 1/11/2003 0533-0604 323 1/13/2003 1445-1453 56 1/15/2003 1110-1115 35 1/16/2003 2151-2157 50 1/18/2003 0625-0640 104 1/19/2003 0936-0957 219 1/20/2003 0407-0412 49 1/21/2003 0115-0129 204 1/2212003 1321-1358 514 1/2312003 2051-2110 198 1/24/2003 0557-0621 333 1/25/2003 0917-0921 36 1/26/2003 1718-1728 104 1/27/2003 0358-0435 257 Page 1 - TOTAL 2,833 ~unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 1/27/2003 2203-2314 229 See Attachments TOTAL 229 Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See Attachments ACTION TAKEN TO EUMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO EUMINATE CAUSE See Attachments TOTAL o ACTION TAKEN TO EUMINATE CAUS See Attachments Planned Events Exceeding 1 Hour OR Exceedin 5000 Mct DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See Attachments TOTAL o Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME 229 o o 22,420 ACTION TAKEN TO EUMINATE CAUSE See Attachments 217/2003 9:25 AM REPORT NO: 03-0063 BPXA FLARE REPORT PRUDHOE BAY FACILITY: GC3 DATE: 27 Jan 2003 SYSTEM 1. Flare/Relief Valve 2. Flare/Relief Valve TIME OF FLARING Black Start Stop Duration Intermittent Smoke Planned VOLUME 03:58 04:35 OHrs 37 Mins 0 0 0 257 MSCF 22:03 23:14 1 Hrs 11 Mins ~ 0 0 229 MSCF TOTAL VOLUME 486 MSCF First Determination of Cause: 1. Due to rising ambient temps and gas transit line pressure, A HP separator flared. 2. Due to rising ambient temps and gas transit line pressure, A HP separator flared. Action Taken to Stop Flaring: 1. Four wells chokes were reduced to minimum, equal 60mmscfpd gas rate. Flaring stopped. 2. Four wells chokes were reduced to minimum, equal to 60mmscfpd gas rate. Flaring stopped. Tuesday, January 28, 2003 Page 1 of 1 Facility ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) Month/Year of Disposition BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 02/2003 GATHERING CENTER 3 Disposition Volume MCF* 1, Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour. 806 4, Flared or vented greater than 1 hour 0 (Supplemental report required - See 20 AAC 25,235) 5. Pilot and Purge 16,311 6. Used for lease operations Fuel 503,419 Assist 0 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 520,536 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: CCP 26,024,960 Remarks: I hereby certD_that tT fOregOin~iS true and correct to the best of my knowledge. Signature: ~(\ 1 J ANI 11 Title: SUPERVISOR Form 10-422 (Revised 4/95) *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING INCIDENT REPORT February 2003 Page 1 ~Unplanned Events less than or equal to 1 hour . DATE· .. TIME.·· . . ... . VOLUME DE$CRIPTlON OF INCIDENT & CAUSE . ... ..... .. .".......,..",.........,..,.......,..",.........".,.......,.,,,.-.....,..".....,...,."........".,_......"."_.....".,....,...,,. ,,,...,,,,........,,. ..... 2/25/2003 0707-0721 778 Not required for unplanned events which 2/28/2003 0420-0424 28 are less than or equal to 1 hour . ACTION TAKEN TO ELIMINATE CAUSE ... Not required for unplanned events which are less than or equal to 1 hour TOTAL 806 See Attachments See Attachments TOTAL o ~Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE . TIME· VOLUME DESCRIPTION OF INCIDENT & CAUSE . See Attachments ACTION TAKEN TO ELIMINATE CAUSE See Attachments f TOTAL o Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf See Attachments See Attachments TOTAL o Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist 806 o o o TOTAL FLARED VOLUME 17,117 3/7/2003 3:33 PM GATHERING CENTER 3 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION perator Field s) Month/Year of Disposition BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 03/2003 Facility Disposition Volume MCF* *Indicate contribution of each pool to total. 1. Sold o Pool Name Code Percent 2. Reinjected o PRUDHOE 640150 100.00% 3. Flared or vented less than 1 hour. 3,737 3,655 5. Pilot and Purge 18,398 6. Used for lease operations Fuel Assist 533,500 o 7. Other Lift Gas, Off Field o TOTAL items 1 -7 559,290 1. Safety 5,.(,'55 MCF:JÉf'- 8. NGL gas equivalent produced o 2. Lease Use MCF 9. Purchased gas o 3. Conserv. Purposes MCF , 10. Transferred from: o /ê--fj ~d--~ Commissi er 5/81°3 . Date 11. Transferred to: CCP 28,035,695 Remarks: Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Signature: Form 10-422 (Revised 4/ 5) Title: SUPERVISOR BP EXPLORATION (ALASKA) INC. PRUDHOE SAY UNIT· GC-a GAS FLARING INCIDENT REPORT March 2003 lunplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 3/1/2003 0200-0204 42 Not required for unplanned events which 3/1/2003 0225-0230 35 are less than or equal to 1 hour 3/3/2003 0250-0255 69 3/6/2003 1145-1245 1,667 3/6/2003 1626-1638 167 3/1 0/2003 0335-0341 83 3/13/2003 0315-0330 45 3/13/2003 1155·1231 215 3/16/2003 1233-1250 177 3/18/2003 0517-0531 146 3/18/2003 0850-0855 52 3/21/2003 1356-1400 50 3/23/2003 1535-1539 100 3/28/2003 0205-0221 167 3/28/2003 2128-2135 97 3/29/2003 2014-2020 625 Page 1 TOTAL 3,737 ~unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 3/1212003 1930-2400 806 See Attachments 3/13/2003 0000-0156 346 3/30/2003 0140-0323 2,503 TOTAL 3,655 Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct DATE TIME VOLUME DESCRIPTION.OF INCIDENT & CAUSE See Attachments TOTAL o JPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mct DATE TIME VOLUME DESCRIPTION OFINCIDENT & CAUSE See Attachments t TOTAL o Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME TOTAL 3,737 3,655 o o 25,790 ACTION TAKEN TO EUMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO EUMINATE CAUSE See Attachments ACTION TAKEN TO EUMINATE CAUSE See Attachments ACTION. TAKEN TO ELIMINATE CAUSE See Attachments 4/812003 11:41 AM REPORT NO: 03-0134 BPXA FLARE REPORT PRUDHOE BAY FACILITY: GC3 DATE: 12 Mar 2003 SYSTEM 1. Flare/Relief Valve TIME OF FLARING Start Stop Duration 19:30 24:00 4Hrs 30Mins Black Intermittent Smoke Planned o 0 o VOLUME 806 MSCF 806 MSCF TOTAL VOLUME First Determination of Cause: 1. K5500 Shut Down due to PCM132A Glitch. Action Taken to Stop Flaring: 1. Flaring was permitted to continue while GC operations personnel attempted to restart the equipment. K5500 did not restart in time alloted per procedure so at 2330 Choked to minimum 28 wells equaling 220mmscf/d. Monday, March 31, 2003 Page 1 of 1 REPORT NO: 03-0135 BPXA FLARE REPORT PRUDHOE BAY FACILITY: GC3 DATE: 13 Mar 2003 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 00:00 01:56 1 Hrs 56 Mins 0 0 0 346 MSCF 2. Flare/Relief Valve 03:15 03:30 OHrs 15 Mins 0 0 0 45 MSCF 3. Flare/Relief Valve 11:55 12:31 OHrs 31 Mins ~ 0 0 215 MSCF TOTAL VOLUME 606 MSCF First Determination of Cause: 1. K-5500 SID due to instrumentation problem. 2. K-5500 SID due to instrumentation problem 3. High gas transit line pressure caused by CCP compressor problems due to 6 degree increase in temperature. Action Taken to Stop Flaring: 1. Reduced production on 28 wells until K-5500 was restarted. 2. Corrected instrumentation problem and restarted K-5500 3. CCP loaded 1878 tandem compressor and flaring ceased. Monday, March 31, 2003 Page 1 of 1 REPORT NO: 03-0156 BPXA FLARE REPORT PRUDHOE BAY FACILITY: GC3 DATE: 30 Mar 2003 SYSTEM 1. Flare/Relief Valve TIME OF FLARING Start Stop Duration 01 :40 03:23 1 Hrs 43Mins Black Intermittent Smoke o 0 Planned VOLUME o 2,503 MSCF TOTAL VOLUME 2,503 MSCF First Determination of Cause: 1. GC shut down due to lPS/PlC malfunction. Extended flaring event occurred while awaiting GC operator/maintenance to restart compressors/ plant. Action Taken to Stop Flaring: 1. All rate was shut in to GC-3 until repairs were made to PLC. (Replaced data highway) Rate started back to plant for compressor restart.Problems with compressor restart delayed start up. Turbine techs called out to assist with start up. Monday, March 31, 2003 Page 1 of 1 GPB Flaring Incident Subject: GPB Flaring Incident Date: Sun, 30 Mar 2003 19:15:30 -0600 From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com> To: steve_mcmains@admin.state.ak.us CC: "Fiedler, Anne M" <FiedleAM@BP.com>, "Benson, Gary A" <BensonGA@BP.com>, "Pfeiffer, Jim A" <PfeiffJA@BP.com>, "GPB, Environ Advisor West" <GPBEnvironAdvisorWest@BP.com>, "GPB, Environ TL" <GPBEnvironTL@BP.com>, "GPB, Environ Advisor East" <GPBEnvironAdvisorEast@BP.com> > > steve mcmains@admin.state.ak.us > 907-276-7542 > > Team Leader, 907-659-4472 To: Steve McMains, AOGCC 907-793-1241, fax From: Michael Bolkovatz, GPB Prod Optim > > An extended flare incident occurred on March 30, 2003 at GC3. The entire plant shutdown due to a PLC (process logic controller) failure. After the PLC was repaired, the Operators started reestablishing rate to the plant. One of the LPS compressors would not restart. Flaring occurred for 1 hr, 43 mins for a total volume of 2,503 MSCF until the LPS machine was started. > > If you require additional information, please don't hesitate to call me. > > > > > > > Michael Bolkovatz GPB production Optimization TL 659-4472, 659-5566 GPB Flaring Incident Subject: GPB Flaring Incident Date: Thu, 13 Mar 200320:12:22 -0600 From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com> To: steve _ mcmains@admin.state.ak.us cc: "Fiedler, Anne M" <FiedleAM@BP.com>, "Benson, Gary A" <BensonGA@BP.com>, "Pfeiffer, Jim A" <PfeifDA@BP.com>, "GPB, Environ Advisor West" <GPBEnvironAdvisorWest@BP.com>, "GPB, Environ TL" <GPBEnvironTL@BP.com>, "GPB, Environ Advisor East" <GPBEnvironAdvisorEast@BP.com> To: Steve McMains, AOGCC steve mcmains@admin.state.ak.us 907-793-1241, fax 907-276-7542 From: Hal Tucker, GPB Prod Optim Team Leader, 907-659-4472 An extended flare incident occurred on March 13, 2003 at GC3. K5500 wet gas compressor shut down due to a glitch from PCM132A.. After 4 hours K5500 still had not restarted so 28 wells were choked to minimum, per procedure, to reduce flare volume. Total flare time was 6 hours and 26 minutes, total flare volume was 1152 MSCF. If you require additional information, please don't hesitate to call me. Hal Tucker GPB production Optimization TL 659-4472, 659-5566 Facility ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) Month/Year of Disposition BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 04/2003 GATHERING CENTER 3 Disposition Volume MCF* 1, Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour, 728 4. Flared or vented greater than 1 hour 0 (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 17,367 6, Used for lease operations Fuel 511,585 Assist 0 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 529,680 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: CCP 27,505,406 Remarks: I hereby cert~lJ ttforegOi~,iS true and correct to the best of my knowledge. Signature: . . - .Å A.... 11 Title: SUPERVISOR Form 10-422 (Revised 4/95) *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235, BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING INCIDENT REPORT April 2003 Page 1 Not required for unplanned events which are less than or equal to 1 hour 4/2/2003 4/10/2003 4/14/2003 4/15/2003 4/16/2003 4/29/2003 1200-1205 0012-0026 0106-0120 0350-0356 1516-1552 0623-0632 50 Not required for unplanned events which 97 are less than or equal to 1 hour 204 27 275 75 TOTAL 728 lunplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See Attachments TOTAL o Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Met DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See Attachments TOTAL o 5000 Met See Attachments TOTAL o Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist 728 o o o TOTAL FLARED VOLUME 18,095 ACTION TAKEN TO ELIMINATE CAUSE See Attachments ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments 517/2003 3:48 PM GC-3 FlaringlK-5500 Wet Gas Compressor Shutdown Procedure Page 1 of2 Authority: Scope: GPB Operations Manager GPB Custodian: Document Administrator: Issuing Dept: Control Tier: GPB Optimm.tion Engineer BPXA HSE Web Specialist Issue Date: Revision Date: Next Review Date: April 28, 1999 April 6, 2003 June 3, 2004 Operations 3 -GPB Purpose Full compliance at all times with Alaska Oil and Gas Conservation Commission Gas Flaring Regulations. General The Gathering Center 3 (GC-3) and Central Control Room Operators will make every attempt to minimize and eliminate flaring. Flaring to maintain production is not allowed. The Control Room Operator will maintain close communications with GC-3 Operators to keep an updated status of K-5500 and related flaring. The Control Room Operator will coordinate with GC-3 Operators to ensure that specific actions are taken within established time guidelines. Any required production rate changes to minimize and eliminate flaring will be coordinated with the Eastern Operations Center (EOC) to coordinate production rate changes. Specific Action In the event of a shutdown of the GC-3 Wet Gas Compressor, K-5500, the following actions will be taken to minimize flaring: . If K-5500 shuts down, the flare gas assist valves will remain closed unless black smoke is observed (black smoke will not nonnally appear with K-5500 flaring). A period of up to one hour is allowed to restart the compressor or estimate the downtime for repairs. The flare rate under this mode will be approximately 4.3 MMSCFD. · If K-5500 has not restarted after one hour, CRC operators will decrease water rate in 10 mbwpd increments over the next four hours, by notifying F5-3 and pipe-lining water to them. This mode of operation will reduce flaring by approximately 0.6 mmscfd (roughly 3.7 MMSCFD) and will reduce purge gas through the on-line skim tank. · If K-5500 has not restarted after a total of four hours from when the compressor first shut down, GC-3 water rates are reduced to 50 MBWD by shutting in high water cut wells and all produced water is transferred from GC-3 to Flow Station 3. The online skim tank is shut down and isolated. The produced water surge tank, and the slop oil tank are also shut down. This eliminates all flared gas from the water handling facility and reduces flared gas volumes to approximately 2.2 MMSCFD. This mode of operation will be used for an additional three hours to allow further time for returning K-5500 to operation. Note: During very cold weather or during phase weather conditions, it may be prudent to continue flaring rather than shutting in high water cut wells. Shutting the wet wells under extreme conditions could increase the risk of frozen piping, spills, and personnel exposure. The Offtake TL, Field OTL, GC-3 OTL, and Operations Manager should discuss the situation before implementing this step. · If K-5500 has not restarted after a total of seven hours from when the compressor first shut down, all High Pressure production into GC-3 is shut down, eliminating flared gas from the condensate associated with high-pressure production. At this point flared gas volumes are reduced to approximately 1.8 MMSCFD. Production at the Gathering Center is now limited to relatively dry low-pressure production with all water routed to FS-3. Control Tier: 3 - GPB Revision Date: 06/0312001 Document Number: UPS-US-AK-GPB-PCC-HSE-DOC-D0346-3 Print Date: 6/1912003 PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://alaska.bpweb.bp.com/ems/ GC-3 Flaring/K-SSOO Wet Gas Compressor Shutdown Procedure Page 2 of 2 . Finally, after a total of twenty-four hours from when the compressor shut down and if start-up of K-5500 is not expected imminently, the operating mode of the facility will be reviewed and approved by the Operations Manager. Approval: PBU Operations Manager / PBU Production TL Date Approved Revision Log Revision Date Authority Reviser April 27, 1999 Matt Werner Kelly Eager June, 1999 Matt Werner PCC Staff Sept.. 1999 Matt Werner K. Eager May 8, 2000 Tom French PCC Staff June 3, 2001 Hal Tucker PCC Staff April 6,2003 Hal Tucker PCC Staff Revision Details Version 1 Update position titles. Revision of estimated flared gas volumes based on decommissioning of GFCs and Dirty Water Tank. Notes on wet well shut in. Recertification Review Recertification Review GC has taken one skim tank (T=8512) out of service. Revision to cut gas rate with remaining skim tank. Control Tier: 3 - GPB Revision Date: 06/03/2001 Document Number: UPS-US-AK-GPB-PCC-HSE-DOC-D0348-3 Print Date: 6/19/2003 PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://alaska.bpweb.bp,com/ems/ Facility ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) Month/Year of Disposition BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU OS/2003 GATHERING CENTER 3 Disposition Volume MCF* 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour. 7,469 4, Flared or vented greater than 1 hour 0 (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 18,709 6. Used for lease operations Fuel 547,436 Assist 0 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 573,614 8, NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11, Transferred to: CCP 27,173,132 Remarks: I hereby cert21öt, t! foregoing ð true and correct to the best of my knowledge. Signature: . . --Á ~" Title: SUPERVISOR Form 1 0-422 Revised 4/95 ( *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1, Safety MCF 2. Lease Use MCF 3. Conserv, Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25,235. BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING INCIDENT REPORT May 2003 Page 1 5/1/2003 5/3/2003 5/4/2003 5/6/2003 5/6/2003 5/6/2003 5/9/2003 5/10/2003 5/11/2003 5/13/2003 5/13/2003 5/13/2003 5/15/2003 5/15/2003 5/15/2003 5/16/2003 5/17/2003 5/17/2003 5/17/2003 5/17/2003 5/18/2003 5/18/2003 5/19/2003 5/19/2003 5/19/2003 5/20/2003 5/25/2003 5/25/2003 0056-0112 1846-1855 1540-1552 0434-0439 0451-0520 1106-1143 0225-0303 0340-0353 0725-0732 1007-1031 1044-1106 1604-1615 0931-0941 0948-0954 2159-2239 1438-1450 0400-0406 0723-0736 1331-1337 1346-1356 0258-0319 0623-0634 0455-0500 0530-0536 1305-1310 0306-0354 0035-0059 2335-2340 278 Not required for unplanned events which 94 are less than or equal to 1 hour 117 42 100 2,235 924 181 49 200 183 92 104 63 472 167 75 226 63 104 394 153 104 63 69 567 333 17 TOTAL 7,469 Not required for unplanned events which are less than or equal to 1 hour 6/9/2003 11:37 AM SP EXPLORATION (ALASKA) INC. PRUDHOE SAY UNIT - GC-3 GAS FLARING INCIDENT REPORT May 2003 Page 2 See Attachments See Attachments TOTAL o Planned Events Less Than or Equal 1 Hour AND Not Exeeedin 5000 Mef See Attachments See Attachments TOTAL o See Attachments See Attachments TOTAL o Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist o o o TOTAL FLARED VOLUME 26,178 6/9/2003 11:37 AM Facility ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) Month/Year of Disposition BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 06/2003 GATHERING CENTER 3 Disposition Volume MCF* *Indicate contribution of each pool to total. 1. Sold 0 Pool Name Code Percent 2. Reinjected 0 PRUDHOE 640150 100.00% 3. Flared or vented less than 1 hour, 2,478 k 4. Flared or vented greater than 1 hour 1,124 ./ (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 11,028 6. Used for lease operations Fuel 329,103 Assist 0 7. Other Lift Gas, Off Field 0 1/> ....... 1Ît1.lthørîza > Ln. .............< TOTAL items 1 - 7 343,733 1. Safety ¡ , ... 4- MCF , I I '-, 8, NGL gas equivalent produced 0 2. Lease Use MCF 9, Purchased gas 0 3. Conserv. purpos/ MCF ~ .- 10. Transferred from: 0 lL) ~4 7A/b Con1 v-:. ./ I . ,[ miSSioner Date 11. Transferred to: CCP 20,400,765 Note: All volumes must be corrected to pressure of 14,65 Remarks: psia and to a temperature of 60 degrees F, Report due by the 20th of the month following the month of disposition. I hereby cert0 t) tt fOregOi] is true and correct to the best of my knowledge. Authority 20 AAC 25,235. Signature: .). j "^ )J. Title: SUPERVISOR Form 10-422 (Revised 4/95) BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT· GC-3 GAS FLARING INCIDENT REPORT June 2003 Page 1 'Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCiDENT & CAUSE 6/7/2003 1658-1735 206 Not required for unplanned events which 6/11/2003 0808-0824 100 are less than or equal to 1 hour 6/11/2003 1530-1535 69 6/13/2003 0806-0812 645 6/13/2003 1314-1322 556 6/13/2003 1409·1425 222 6/13/2003 1604-1616 125 6/14/2003 1434-1439 69 6/24/2003 1512-1532 486 TOTAL 2,478 ~UnPlanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 6/7/2003 1500-1658 410 See Attachments 6/7/2003 1750-2130 694 6/7/2003 2130-2359 10 6/8/2003 0001-0915 10 TOTAL 1,124 rPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See Attachments TOTAL o rPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See Attachments TOTAL o Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME 1,124 o o 14,630 ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE See Attachments ACTION TAKEN TO ELIMINATE CAUSE See Attachments ACTION TAKEN TO ELIMINATE CAUSE See Attachments 7/9/2003 2:00 PM REPORT NO: 03· ~- ~\R- df ~~ --b ~ WiI\. .h. - (I Ji.e. ðJ4.. W ßp~ ~~t"~ ~9J; ~~ BPXA FLARE REPORT PRUDHOE BAY FACILITY: GC3 DATE: 07 Jun 2003 SYSTEM 1. Flare/Relief Valve 2. Flare/Relief Valve 3. Flare/Relief Valve 4. Flare/Relief Valve TIME OF FLARING Black Start Stop Duration Intermittent Smoke Planned VOLUME 15:00 ~8) 1 Hrs 58 Mins ~ ~ 0 410 MSCF / ~ r-.¡;¿ ~ 17:35 OHrs 37 Mins ~ ~ 0 206 MSCF 1~:3()' 4Hrs 10Mins ~ ~ 0 694 MSCF (f~ªQ')2~;~~~ 2 Hrs 29Mins ~ ~ 0 10 MSCF TOTAL VOLUME 1 ,320 MSCF First Determination of Cause: 1. Starting plant from a planned maintenance shutdown. Flaring occurred to the burn pit while bringing in minimal rate to allow LPS machi~~~ 2. Flaring occurred to allow depressuring C-slugcatcher to equalize inlet SDV for LDE'Ð 3. Flaring occurred off of V320 LP knockout during ~;;f vent gas blowers and K5500 LP compressor 4. Estimated five to ten percent opacity with sporadic fifteen to thirty second puffs of black smoke. Most likely from small valve leakage from remaining safe out (volume too small to calculate, estimated at ten). Action Taken to Stop Flaring: 1. Started LPS compressor 7001 2. Equalized and opened Inlet to C slugcatcher 3. Started vent gas blowers and K5500 LP compressor 4. Allowed to continue as a SID would have likely caused a bigger black smoke incident. GC3 personnel continue to look for possible leaks to the flare system. Thursday, June 26, 2003 Page 1 of 1 REPORT NO: 03-0367 BPXA FLARE REPORT PRUDHOE BAY FACILITY: GC3 DATE: 08 Jun 2003 SYSTEM 1. Flare/Relief Valve TIME OF FLARING Start Stop Duration 00:01 09:15 9Hrs 14Mins Black Intermittent Smoke ~ ~ Planned o VOLUME 10 MSCF 10 MSCF TOTAL VOLUME First Determination of Cause: 1. Allowed to continue as a SID would have likely caused a bigger flaring incident. GC3 personnel continue to look for possible leaks to the flare system. Found the flare valve on C-slug catcher leaking. Action Taken to Stop Flaring: 1. Took all production out of C-slugcatcher and the intermittent flaring stopped completely ~/1fJI7 -tk~ r~~? , Thursday, June 26, 2003 Page 1 of 1 Facility ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) Month/Year of Disposition BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 07/2003 GATHERING CENTER 3 Form 10-422 (Revised 4/95) *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1. Safety MCF Disposition Volume MCF* 1, Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour. 1,572 4. Flared or vented greater than 1 hour 0 (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 16,282 6. Used for lease operations Fuel 473,063 Assist 0 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 490,917 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11, Transferred to: CCP 27,864,936 Remarks: I hereby ce~~r; t~orego::p true and correct to the best of my knowledge. Signature: . . 1 '" ~ I, Title: SUPERVISOR 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING INCIDENT REPORT July 2003 Page 1 lunplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 7/1/2003 1129-1132 15 Not required for unplanned events which 7/7/2003 1245-1258 108 are less than or equal to 1 hour 7/7/2003 2028-2036 83 7/8/2003 0434-0437 21 7/8/2003 0532-0539 58 7/10/2003 1512-1532 833 7/24/2003 1256-1300 61 7/26/2003 1020-1040 278 7/28/2003 1844-1855 115 TOTAL 1,572 IUnplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See Attachments TOTAL o JPlanned Events Less Than or Equal 1 Hour AND Not Exceedin~ 5000 Mct DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See Attachments TOTAL o Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Met DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See Attachments TOTAL o Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist o o o TOTAL FLARED VOLUME 17,854 ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE: CAUSE See Attachments ACTION TAKEN TO ELIMINATE CAUSE See Attachments ACTION TAKEN TO ELIMINATE CAUSE See Attachments 8/11/2003 1 :39 PM .... Facility ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) Month/Year of Disposition BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 08/2003 GATHERING CENTER 3 Form 10 422 (Revised 4/95) *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1, Safety MCF Disposition Volume MCF* 1, Sold 0 2. Reinjected 0 3, Flared or vented less than 1 hour. 424 4. Flared or vented greater than 1 hour 0 (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 15,384 6. Used for lease operations Fuel 487,442 Assist 0 7. Other Lift Gas, Off Field 0 TOTAL items 1 . 7 503,250 8, NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: CCP 28,684,213 Remarks: I hereby ceC5.that t~egOing is true and correct to the best of my knowledge. Signature: ~0 . "/I'&" 0 J 1 Title: SUPERVISOR - \ 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 MC 25.235. BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING INCIDENT REPORT August 2003 Page 1 lunplanned Events less than or equal to 1 hour DATE ..... ...... TIME .. ... . ·VOLUMEDESPRIPTlONOF INCIDENT & CAUSE . .. .... 8/10/2003 0544-0607 160 Not required for unplanned events which 8/13/2003 1940-1946 21 are less than or equal to 1 hour 8/31/2003 1404-1429 243 .... .... ACTlONTAKENTOELIMINATt;PAU~E··· Not required for unplanned events which are less than or equal to 1 hour J TOTAL 424 See Attachments See Attachments TOTAL o Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf See Attachments See Attachments TOTAL o Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf See Attachments See Attachments TOTAL o Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist o o o TOTAL FLARED VOLUME 15,808 9/9/2003 9:02 AM Facility ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) Month/Year of Disposition BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 09/2003 GATHERING CENTER 3 Disposition Volume MCF* 1, Sold 0 2, Reinjected 0 3. Flared or vented less than 1 hour. 10,880 4, Flared or vented greater than 1 hour 0 (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 13,561 6. Used for lease operations Fuel 468,572 Assist 0 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 493,013 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: CCP 27,780,610 Remarks: I hereby certC¿that tht fOreg~;Vs true and correct to the best of my knowledge, Signature: w Q..1 .P I Title: SUPERVISOR - Form 10 422 (Revised 4/95) *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1, Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14,65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition, Authority 20 AAC 25.235. BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC·3 GAS FLARING INCIDENT REPORT September 2003 Page 1 lunPlanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 9/9/2003 1045-1052 486 Not required for unplanned events <= 1 hr 9/9/2003 1745-1918 359 Intermittent 9/10/2003 1448-1207 330 9/16/2003 1432-1438 42 9/17/2003 2347-2400 451 9/18/2003 0000-0044 1,528 9/19/2003 0752-0800 261 9/20/2003 1638-1654 667 9/22/2003 0533-0537 56 9/22/2003 1437-1516 4,333 9/26/2003 1930-2015 1,406 9/26/2003 2156-2224 778 9/29/2003 1049-1122 183 TOTAL 10,880 IUnplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See Attachments TOTAL o Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See Attachments TOTAL o Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mct DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See Attachments TOTAL o Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME TOTAL 10,880 o o o 24,441 ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE See Attachments ACTION TAKEN TO ELIMINATE CAUSE See Attachments ACTION TAKEN TO ELIMINATE CAUSE See Attachments 1 0/7/2003 10:26 AM Facility ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) Month/Year of Disposition BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 10/2003 GATHERING CENTER 3 Disposition Volume MCF* 1. Sold 0 2. Reinjected 0 3, Flared or vented less than 1 hour. 759 4, Flared or vented greater than 1 hour 0 (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 14,702 6. Used for lease operations Fuel 505,727 Assist 0 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 521,188 8, NGL gas equivalent produced 0 9. Purchased gas 0 10, Transferred from: 0 11. Transferred to: CCP 28,489,676 Remarks: I hereby cert(}.7\thet:;.going ~ true and correct to the best of my knowledge. Signature:. A ~.... 1, Title: SUPERVISOR Form 10-422 (Revised 4/95) *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ,þ SP EXPLORATION (ALASKA) INC. PRUDHOE SAY UNIT - GC-3 GAS FLARING INCIDENT REPORT October ~03 Page 1 Unplanned Events less than or equal to 1 hour 10/2/2003 1 0/2/2003 10/5/2003 1 0/15/2003 10/15/2003 1 0/19/2003 10/19/2003 10/27/2003 0222-0238 2334-2340 1936-1945 0115-0120 1015-1030 2033-2055 2249-2259 0428-0434 TOTAL 56 Not required for unplanned events <= 1 hr 21 63 35 229 153 139 63 759 Not required for unplanned events which are less than or equal to 1 hour lunPlanned Events greater than 1 hour DATE TIME VOLUME TOTAL DESCRIPTION OF INCIDENT & CAUSE See Attachments .. o ACTION TAKEN TO ELIMINATE CAUSE See Attachments Iplanned Events Less Than or Equal 1 Hour AND Not Exceedin9 5000 Mct DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See Attachments TOTAL o tPlanned Events Exceeding 1 Hour OR Exceeding 5000 Met DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See Attachments ACTION TAKEN TO ELIMINATE CAUSE See Attachments TOTAL Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME o ~. o o o 15,461 ACTION TAKEN TO ELIMINATE CAUSE See Attachments 111712003 1 :52 PM . . Facility ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) Month/Year of Disposition BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 11/2003 GATHERING CENTER 3 Disposition Volume MCF* 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour, ~,t,b? 4. Flared or vented greater than 1 hour yqt¡'lû (Supplemental report required - See 20 AAC 25.235) 5, Pilot and Purge 14,300 6. Used for lease operations Fuel 516,761 Assist 0 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 542,244 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: CCP 25,259,785 Remarks: I hereby ce(J.C;~ te fOregO! is true and correct to the best of my knowledge. Signature: . . A. ". ~ Title: SUPERVISOR Form 10-422 Revised 4/951l *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% ~. ~&a- 1. Safety 9,QZO MCF ~ 2. Lease Use MCF 3. Conserv, Purposes MCF 1/1/9-- { Date t ' Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Junplanned Events less than or equal to 1 hour ... .D)%TE . .. .. .. TIME·· . . . VOLUME .. . . DESCRIPTION OF INCIDENT & CAUSE 11/12/2003 0850-0908 175 Not required for unplanned events <= 1 hr 11/14/2003 1306-1330 1,OQO --- 11/15/2003 0416-0515 /Ü6 - 11/20/2003 2037-2043 46 1'1Þf) ~ ~ 1/21/2003 0920-0941 88 1 { A" BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC·3 GAS FLARING INCIDENT REPORT November 2003 Page 1 .. ACTION TAKEN TO EUMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour TOTAL ,1.A-85 - I 2-0 3 ~3.-'2- Oi- Unplanned Events reater than 1 hour 11/15/2003 11/15/2003 11/15/2003 11/16/2003 11/17/2003 11/18/2003 11/19/2003 0515-0735 0735-1042 1042-2400 0000-2400 0000-2400 0000-2400 0000-1435 360 See Attachments 286 998 2,640 1,800 2,520 1,094 See Attachments TOTAL ;ßß8"/ tj'1''lð !'lee ...~Z/04- JPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf . DATE . TIME· . . V()LOME .. . DESCRIPTION Of INCIDENT & CAUSE See Attachments ACTION TAt<:ENTO ELIMINATE CAUSE· See Attachments TOTAL o tPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf . . DATE TIME . . VOLUME DE$CFUPTIONOF INClDENT& CAUSE See Attachments Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5.000 MCF Pilot Purge Assist TOTAL FLARED VOLUME ACTION TAKEN TO Et,.IMINATECAUSE . . See Attachments TOTAL o 9.698 o o 25,483 1 2/5/2003 10:26 AM REPORT NO: 03-0631 BPXA FLARE REPORT PRUDHOE BAY FACILITY: GC3 DATE: 15 Nov 2003 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 04:16 05:15 OHrs 59 Mins 0 0 0 176 MSCF I ./ " 2. Flare/Relief Valve 05:15 07:35 2Hrs 20 Mins 0 0 0 560 ''MSCF 3. Flare/Relief Valve 07:35 10:42 3Hrs 7Mins 0 0 0 286 MSCF ./ 4. Flare/Relief Valve 10:42 24:00 13Hrs 18 Mins 0 0 0 998 MSCF ./ TOTAL VOLUME "1;'820' 'MSCf First Determination of Cause: 1. Sk-18 LP compressor K-5500.sbutdown.becauseotcontrol/instrumentation failure ,associated wUh purge for control panel. 2. K-5500 Shut down 3. K-5500 Shut down. 4. K-5500 Shut down. Action Taken to Stop Flaring: 1: Flaring was "Permitted' to continuewhifeGO;'Operationspersonnel attempted to restart"the'~t:lipment. After trouble shooting the compressor woúld not start. Following procedure, the assist gas was blocked in. Flaring 4.3 mmscfd. 2. Following procedure, started decreasing water rates in 10 mbwpd over the next four hours. At 0735 shut in skim tanks. Flare rate was 3.7 mmscfd. 3. Shut in skim tanks reduced flare rate to 2.2 mmscfd. 4. All HP production was choked to minimum or shut in, reducing flare rate to 1.8 mmscfd. Ambient was -20 so OTL decided not to shut in all wells. Wells are being cycled off and on for freeze protection. Wednesday, November 19, 2003 Page 1 of 1 bp REPORT NO: 03-0634 BPXA FLARE REPORT PRUDHOE BAY FACILITY: GC3 DATE: 16 Nav 2003 SYSTEM 1. Flare/Relief Valve TIME OF FLARING Black Start Stop Duration Intermittent Smoke Planned 00:00 24:00 ., Hrs IMins 0 0 0 o VOLUME 2,640 MSCF TOTAL VOLUME J 2,62!:O'MSCF First Determination of Cause: 1. K-5500 Shut down. Action Taken to Stop Flaring: 1. All HP production was choked to minimumUf'shut in, reducing flare rate to 1.8 mmscfd. Ambient was -20 so OTL decided not to shut in all wells. Wells are being cycled off and onJor freeze protection. VVednesday, November19,2003 Page 1 of 1 REPORT NO: 03-0637 BPXA FLARE REPORT PRUDHOE BAY FACILITY: GC3 DATE: 17 Nov 2003 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 00:00 24:00 24 Hrs OMins 0 0 0 1,800 MSCF TOTAL VOLUME'" 1 ;aOO'MSCF J First Determination of Cause: 1. K-5500 shut down Action Taken to Stop Flaring: 1. Skim tanks are blocked in, all HP production was choked to minimum or shut in, reducing flare rate to 1.8 mmscfd. Ambient was -20 so. OILdec.idecLooUo shut in all wells. HP wells .are.bejog .cycled on and off for freeze protection. Wednesday, November 19, 2003 Page 1 of 1 REPORT NO: 03-0638 BPXA FLARE REPORT PRUDHOE BAY FACILITY: GC3 DATE: 18 Nov 2003 SYSTEM 1. Flare/Relief Valve TIME OF FLARING Black Start Stop ~uratio~ Intermittent Smoke 00:00 24:00 ~Hrs .Mins 0 0 Planned o VOLUME 2,520 MSCF 2;520'MSCF/ TOTAL VOLUME First Determination of Cause: 1. K-5500 compressor Shut down. Changing out compressor seal and repairing slide valve. Action Taken to Stop Flaring: 1. Skim tanks are blocked in, all HP production was choked to minimum or shut in, reducing flare rate to 1.8 mmscfd. Ambient was -20 so OTL decided not to shut in all wells. HP wells are being çycled on and off for freeze protection. Assist gas added to prevent black smoke. VVednesday, November19,2003 Page 1 of 1 REPORT NO: 03-0639 BPXA FLARE REPORT PRUDHOE BAY FACILITY: GC3 DATE: 19 Nov 2003 SYSTEM 1. Flare/Relief Valve TIME OF FLARING Black Start Stop Duration Intermittent Smoke Planned 00:00 14:35 14Hrs 35Mins [] 0 0 TOTAL VOLUME VOLUME 1,094 MSCF 1;994'MSOF j First Determination of Cause: 1. K-5500 compressor Shut down. Changing out compressor seal and repairing slide valve. Action Taken to Stop Flaring: 1. Skim tanks are blocked in, all HP production was choked to minimum or shut in, reducing flare rate to 1.8 mmscfd. Ambient was -20 so OTL decided not to shut in all wells. HP wells are being cycled on and oft for freeze protection. Assist gas added to prevent black smoke. Thursday, November 20, 2003 Page 1 of 1 Greater Prudhoe Bay Flaring Event Subject: Greater Prudhoe Bay Flaring Event Date: Sat, 15 Nov 2003 16:14:43 -0900 From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com> To: steve_mcmains@admin.state.ak.us Steve, Today GC3's wet gas compressor (K5500) shut down unexpectedly due to "loss of purge in the instrument cabinet". After reviewing the issues that will have to be dealt with in order to restart K5500, we have determined that the most efficient course of action is to replace the compressor immediately. In order to restart K5500 in its current condition we would have to open up the compressor to repair a stuck slide valve. Repairing the stuck slide valve would take, at a minimum, as much time as replacing the compressor with a strong likelihood of a longer duration. This course of action will enable us to confidently return the machine to service for the long term. We had already planned to replace the compressor in the summer of 2004 ~, due to a slowly deteriorating vibration problem. ' We will follow the agreed procedure for minimizing flared gas during K5500 shut down events. The final step in the procedure calls for full shut down of the plant if after 24 hours, restart of K5500 is not imminent. The current ambient temperature is -20F, with the forecast calling for lows between -20F and -30F through Monday. We feel that the most prudent course of action, under these conditions, is to allow GC3 to continue to flare (approximately 2 MMSCFPD) in order to keep the plant partially on line. Our best estimate is that K5500 should be ready for a restart Monday afternoon. When K5500 is back on line and the flaring event is over, I will submit a follow up note. If you have an questions, please do not hesitate to call me at 659-4472. Thank you, Hal Tucker Greater Prudhoe Bay Production Optimization Team Leader '1 of 1 11/16/20039:09 AM FW Grea"ær Prudhoe Bay Flaring Event Steve, GC3's K5500 flaring event, which began at 04:16 on 11/15, ended at 14:35 on 11/19. Total flare duration was 106 hours and 19 minutes. The total flared volume for this event was 9.874 mmscf. During the four day flare event, technicians had to go back into K5500 for two separate repairs, once to replace a leaking compressor mechanical seal and again to repair an excessive lube oil leak. The mechanical seal failure occurred during the initial restart attempt on 11/17 and required replacement of the mechanical seal. The oil leak was discovered prior to the second restart attempt on 11/18 and required replacement of a compressor slide valve "0" ring. K5500 was restarted and loaded up on 11/19 and has been running smoothly since then.. High pressure production wells were cycled on and off periodically during the four days to prevent flow line freeze up. Additionally, produced water was stacked in the skim tank and the produced water pumps brought on briefly each day to warm up injection wells and lines. If you have any questions, please do not hesitate to call me at 659-4472. Thank you, Hal Tucker Greater Prudhoe Bay production Optimization Team Leader -----Original Message----- From: GPB, Prod Opt TL Sent: Saturday, November 15, 2003 4:15 PM To: 'steve mcmains@admin.state.ak.us' Subject: Greater Prudhoe Bay Flaring Event Steve, 10f2 11/24/20037:23 AM FW: Greafer Prudhoe Bay Flaring Event Today GC3's wet gas compressor (K5500) shut down unexpectedly due to "loss of purge in the instrument cabinet". After reviewing the issues that will have to be dealt with in order to restart K5500, we have determined that the most efficient course of action is to replace the compressor immediately. In order to restart K5500 in its current condition we would have to open up the compressor to repair a stuck slide valve. Repairing the stuck slide valve would take, at a minimum, as much time as replacing the compressor with a strong likelihood of a longer duration. This course of action will enable us to confidently return the machine to service for the long term. We had already planned to replace the compressor in the summer of 2004 due to a slowly deteriorating vibration problem. We will follow the agreed procedure for minimizing flared gas during K5500 shut down events. The final step in the procedure calls for full shut down of the plant if after 24 hours, restart of K5500 is not imminent. The current ambient temperature is -20F, with the forecast calling for lows between -20F and -30F through Monday. We feel that the most prudent course of action, under these conditions, is to allow GC3 to continue to flare (approximately 2 MMSCFPD) in order to keep the plant partially on line. Our best estimate is that K5500 should be ready for a restart Monday afternoon. When K5500 is back on line and the flaring event is over, I will submit a follow up note. If you have an questions, please do not hesitate to call me at 659-4472. Thank you, Hal Tucker Greater Prudhoe Bay Production Optimization Team Leader 2 óf2 11124/20037:23 AM Facility ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) Month/Year of Disposition BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 12/2003 GATHERING CENTER 3 Disposition Volume MCF* 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour, 3,714 4, Flared or vented greater than 1 hour 0 (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 16,277 6. Used for lease operations Fuel 530,877 Assist 0 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 550,868 8, NGL gas equivalent produced 0 9. Purchased gas 0 10, Transferred from: 0 11. Transferred to: CCP 29,953,478 Remarks: I hereby certttð th~OregOing ltrue and correct to the best of my knowledge. Signature: . L -^^ li Title: SUPERVISOR - , Form 10 422 (Revised 4/95) *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING INCIDENT REPORT December 2003 Page 1 Unplanned Events less than or equal to 1 hour 12/4/2003 12/5/2003 12/5/2003 12/5/2003 12/5/2003 12/14/2003 12/19/2003 12/22/2003 12/22/2003 12/24/2003 0110-0115 1004-1011 1448-1508 1521-1551 1821-1829 1154-1224 0623-0630 1442-1456 1548-1605 1320-1326 TOTAL 139 Not required for unplanned events <= 1 hr Not required for unplanned events which 131 1,347 354 28 1,305 are less than or equal to 1 hour 73 194 118 25 3,714 Iunplanned Events greater than 1 hour DATE TIME VOLUME. DESCRIPTION OF INCIDENT & CAUSE See Attachments ACTION TAKEN TO ELIMINATE CAUSE See Attachments TOTAL o Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf See Attachments See Attachments TOTAL o Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME 1 Hour OR Exceeding 5000 Mcf See Attachments See Attachments TOTAL o 3,714 o o o 19,991 1/6/2004 3:56 PM