Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutPBU Lisburne Prod(GrPtMc/BP Ex
STATE OF ALASKA
AOGCC
GAS DISPOSITION FILES
YEAR: 2003
FACILITY: PBU Lisburne Prod
(Gr PtMcArea)
OPERATOR: BP EXPLORATION
(ALASKA) INC
I Facility
LISBURNE PRODUCTION CENTER #1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
I Operator I Field(s)
BP EXPLORATION, ALASKA PRUDHOE BAY/PT MCINTYRE
IMonth/Year of Disposition
01/2003
Disposition
Volume MCF*
1. Sold
128,301
2. Reinjected
10,270,663
3. Flared or vented less than 1 hour.
131
4. Flared or vented greater than 1 hour
(Supplemental report required-oSee 20 AAC 25.235)
121
5. Pilot and Purge
43,004
6. Used for lease operations
Fuel
Assist
1,064,077
99,938
7. Other
Lift Gas, Off Field
339,220
TOTAL items 1 - 7
11,945,455
8. NGL gas equivalent produced
128,301
9. Purchased gas
o
10. Transferred from:
o
11. Transferred to:
o
Remarks:
hat the fo~oing is true and correct to the best of my knowledge. I I. /
{l:. ~ Title:~. Q...c.i:t', Date: ;). / I 'ì /0 S
/95)
*Indicate contribution of each pool to total.
Pool Name
Code
Percent
LISBURNE
NIAKUK
N_PRUDHOE
PTMAC
W _BEACH
West Niakuk
/
640144
640148
640152
666100
640186
640149
52.16%
1.15%
0.00%
45.54%
0.00%
1.15%
1. Safety
/ZI MCF ~L
2. Lease Use
MCF
3. Conserv. Purposes
MCF
o þd~~ f}3/~/jo3
/LÞ-~ '/' °1'
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
DATE
1/17/2003
1/22/2003
1/22/2003
Volume Flared
TIME
0545-1510
0545-0546
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-03
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
Total Flare <= 1 Hour 0
1416-1614
Total Flare> 1 Hour
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
22,907
52,006
74,913
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
o
o
EOR Compressor SD, Intrumentation Glitch
Bad contacts on switch caused the EOR 1830 compressor to LD
Unplanned
Unplanned
o
Startup of the EOR 1830 compressor after an unplanned shutdown
Unplanned Faulty switch was fixed
o
o
Restarted EOR 1830 Compressor
Backup 1855 compressor was loaded while fixing 1830 compressor
DATE
01/17/03
01/22/03
01/22/03
Volume Flared
TIME
0545-1510
0545-0546
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-03
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
109
22
Total Flare <= 1 Hour 131
1416-1614
Total Flare> 1 Hour
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
121
121
252
19,134
45,618
65,004
EOR Compressor SD, Intrumentation Glitch
Bad contacts on switch caused the EOR 1830 compressor to LD
Startup of the EOR 1830 compressor after an unplanned shutdown
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Restarted EOR 1830 Compressor
Backup 1855 compressor was loaded while fixing 1830 compressor
Unplanned Faulty switch was fixed
REPORT NO: 03-0052
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: LPC
DATE: 22 Jan 2003
TIME OF FLARING
SYSTEM Start Stop Duration
1. HP Flare/Relief Valv 14:16 16:14 1 Hrs 58Mins
Black
Intermittent Smoke
~ D
Planned
TOTAL VOLUME
D
First Determination of Cause:
1. Start up of the 1830 EOR compressor after a unplanned shutdown.
Total incremental flaring was 16 minutes.
Action Taken to Stop Flaring:
1. Faulty switch was fixed.
Wednesday, February 19,2003
VOLUME
121 MSCF
121 MSCF
Page 1 of 1
DATE
01/17/03
01/22/03
01/22/03
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-03
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
0545-1510
0545-0546
Total Flare <= 1 Hour 0
1416-1614
Volume Flared 0
Total Flare> 1 Hour 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
o
o
EaR Compressor SD, Intrumentation Glitch
Bad contacts on switch caused the EaR 1830 compressor to LD
o
Startup of the EaR 1830 compressor after an unplanned shutdown
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Restarted EaR 1830 Compressor
Backup 1855 compressor was loaded while fixing 1830 compressor
Unplanned Faulty switch was fixed
DATE
01/17/03
01/22/03
01/22/03
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-03
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
0545-1510
0545-0546
Total Flare <= 1 Hour 0
1416-1614
Volume Flared 0
Total Flare> 1 Hour 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
o
o
EaR Compressor SD, Intrumentation Glitch
Bad contacts on switch caused the EaR 1830 compressor to LD
o
Startup of the EaR 1830 compressor after an unplanned shutdown
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned Restarted EaR 1830 Compressor
Unplanned Backup 1855 compressor was loaded while fixing 1830 compressor
Unplanned Faulty switch was fixed
DATE
01/17/03
01/22/03
01/22/03
TIME
VOLUME
(Mscf)
0545-1510
0545-0546
o
o
Total Flare <= 1 Hour 0
1416-1614
o
Volume Flared 0
Total Flare> 1 Hour 0
Measured Safety Pilot 496
Continuous Assist 1,139
TOTAL FLARED 1,635
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-03
DESCRIPTION OF INCIDENTS & CAUSE
EaR Compressor SD, Intrumentation Glitch
Bad contacts on switch caused the EaR 1830 compressor to LD
Startup of the EaR 1830 compressor after an unplanned shutdown
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned Restarted EaR 1830 Compressor
Unplanned Backup 1855 compressor was loaded while fixing 1830 compressor
Unplanned Faulty switch was fixed
DATE
01/17/03
01/22/03
01/22/03
TIME
VOLUME
(Mscf)
0545-1510
0545-0546
o
o
Total Flare <= 1 Hour 0
1416-1614
o
Volume Flared 0
Total Flare> 1 Hour 0
Measured Safety Pilot 467
Continuous Assist 1,175
TOTAL FLARED 1,642
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-03
DESCRIPTION OF INCIDENTS & CAUSE
EaR Compressor SD, Intrumentation Glitch
Bad contacts on switch caused the EaR 1830 compressor to LD
Startup of the EaR 1830 compressor after an unplanned shutdown
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned Restarted EaR 1830 Compressor
Unplanned Backup 1855 compressor was loaded while fixing 1830 compressor
Unplanned Faulty switch was fixed
I Facility
LISBURNE PRODUCTION CENTER #1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
I Operator I Field(s)
BP EXPLORATION, ALASKA PRUDHOE BAY/PT MCINTYRE
I Month/Year of Disposition
02/2003
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
1. Sold
112,264
Pool Name
Code
Percent
3. Flared or vented less than 1 hour.
82
LISBURNE
NIAKUK
N_PRUDHOE
PTMAC
W _BEACH
West Niakuk
640144
640148
640152
666100
640186
640149
54.25%
1 .46%
0.00%
43.20%
0.00%
1.10%
2. Reinjected
9,284,780
4. Flared or vented greater than 1 hour
(Supplemental report required-oSee 20 AAC 25.235)
o
5. Pilot and Purge
12,532
6. Used for lease operations
Fuel
Assist
997,295
72,515
7. Other
Lift Gas, Off Field
127,809
TOTAL items 1 - 7
10,607,277
1. Safety
MCF
8. NGL gas equivalent produced
112,264
2. Lease Use
MCF
9. Purchased gas
o
3. Conserv. Purposes
MCF
10. Transferred from:
o
Commissioner
Date
11. Transferred to:
o
Remarks:
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
I hereby certi y that the foregoing is true and correct to the best of my knowledge.
Signature' í ~ Title: v--o-€ ~ Date: 3>/{ g /ò.3
Form 10-422 (Rev d 4/95)
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-03
DATE
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
2/24/2003
2/26/2003
1432-1445
1327-1328
13
35
EOA Compressor 1830 shutdown
Working on turnine control for 1807 compressor
Unplanned
Unplanned
1855 Compressor was loaded
Manually closed flare valve and completed task
Total Flare <= 1 Hour 48
Total Flare> 1 Hour 0
Volume Flared 48
Measured Safety Pilot 6,797
Continuous Assist 39,412
TOTAL FLARED 46,257
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-03
DATE
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
02/24/03
02/26/03
1432-1445
1327-1328
9
23
EOA Compressor 1830 shutdown
Working on turnine control for 1807 compressor
Unplanned
Unplanned
1855 Compressor was loaded
Manually closed flare valve and completed task
Total Flare <= 1 Hour 32
Total Flare> 1 Hour 0
Volume Flared 32
Measured Safety Pilot 5,414
Continuous Assist 31,262
TOTAL FLARED 36,708
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-03
DATE
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
02/24/03
02/26/03
1432-1445
1327-1328
o
o
EOA Compressor 1830 shutdown
Working on turnine control for 1807 compressor
Unplanned
Unplanned
1855 Compressor was loaded
Manually closed flare valve and completed task
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-03
DATE
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
02/24/03
02/26/03
1432-1445
1327-1328
o
o
EOA Compressor 1830 shutdown
Working on turnine control for 1807 compressor
Unplanned 1855 Compressor was loaded
Unplanned Manually closed flare valve and completed task
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
DATE
02/24/03
02/26/03
Volume Flared
TIME
1432-1445
1327-1328
Total Flare <= 1 Hour
VOLUME
(Mscf)
o
1
Total Flare> 1 Hour 0
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
183
1,047
1,231
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-03
DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
EOA Compressor 1830 shutdown
Working on turnine control for 1807 compressor
Unplanned 1855 Compressor was loaded
Unplanned Manually closed flare valve and completed task
DATE
02/24/03
02/26/03
Volume Flared
TIME
1432-1445
1327-1328
Total Flare <= 1 Hour
Total Flare> 1 Hour 0
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
VOLUME
(Mscf)
o
1
138
794
933
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-03
DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
EOA Compressor 1830 shutdown
Working on turnine control for 1807 compressor
Unplanned 1855 Compressor was loaded
Unplanned Manually closed flare valve and completed task
I Facility
LISBURNE PRODUCTION CENTER #1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
I Operator \ Field(s)
BP EXPLORATION, ALASKA PRUDHOE BAY/PT MCINTYRE
I Month/Year of Disposition
03/2003
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
1. Sold
128,071
Pool Name
Code
Percent
3. Flared or vented less than 1 hour.
533
LISBURNE
NIAKUK
N_PRUDHOE
PTMAC
W _BEACH
West Niakuk
640144
640148
640152
666100
640186
640149
59.58%
1.61%
0.00%
37.69%
0.00%
1.12%
2. Reinjected
9,545,277
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 MC 25.235)
o
5. Pilot and Purge
13,872
6. Used for lease operations
Fuel
Assist
7. Other
Lift Gas, Off Field
1,107,644
125,248
122
TOTAL items 1 -7
10,920,767
1. Safety
MCF
8. NGL gas equivalent produced
128,071
2. Lease Use
MCF
9. Purchased gas
o
3. Conserv. Purposes
MCF
10. Transferred from:
o
Commissioner
Date
11. Transferred to:
o
is true and correct to the best of my knowledge.
Title: M(~ "f1J(>(. Date: ttP1/D3
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
Remarks:
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-03
DATE
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
3/4/2003
3/6/2003
1618-2114 (intermittent)
0835-1541 (intermittent)
81
230
Startup purge and depressure during EaR compressor startup
Startup purge and depressure during EaR compressor startup
Unplanned
Unplanned
Startup discontinued and depressured
EaR compressor startup completed
Total Flare <= 1 Hour 311
Total Flare> 1 Hour 0
Volume Flared 311
Measured Safety Pilot 8,265
Continuous Assist 74,486
TOTAL FLARED 83,062
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-03
DATE
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
03/04/03
03/06/03
1618-2114 (intermittent)
0835-1541 (intermittent)
53
154
Startup purge and depressure during EaR compressor startup
Startup purge and depressure during EaR compressor startup
Unplanned
Unplanned
Startup discontinued and depressured
EaR compressor startup completed
Total Flare <= 1 Hour 207
Total Flare> 1 Hour 0
Volume Flared 207
Measured Safety Pilot 5,227
Continuous Assist 47,340
TOTAL FLARED 52,774
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-03
DATE
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
03/04/03
03/06/03
1618-2114 (intermittent)
0835-1541 (intermittent)
o
o
Startup purge and depressure during EaR compressor startup
Startup purge and depressure during EaR compressor startup
Unplanned
Unplanned
Startup discontinued and depressured
EaR compressor startup completed
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
DATE
TIME
03/04/03 1618-2114 (intermittent)
03/06/03 0835-1541 (intermittent)
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-03
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
o
o
Startup purge and depressure during EaR compressor startup
Startup purge and depressure during EaR compressor startup
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned Startup discontinued and depressured
Unplanned EaR compressor startup completed
DATE
03/04/03
03/06/03
TIME
VOLUME
(Mscf)
1618-2114 (intermittent)
0835-1541 (intermittent)
2
6
Total Flare <= 1 Hour 8
Volume Flared 8
Total Flare> 1 Hour 0
Measured Safety Pilot 224
Continuous Assist 2,013
TOTAL FLARED 2,245
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-03
DESCRIPTION OF INCIDENTS & CAUSE
Startup purge and depressure during EaR compressor startup
Startup purge and depressure during EaR compressor startup
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned Startup discontinued and depressured
Unplanned EaR compressor startup completed
DATE
03/04/03
03/06/03
TIME
1618-2114 (intermittent)
0835-1541 (intermittent)
VOLUME
(Mscf)
Total Flare <= 1 Hour 7
Total Flare> 1 Hour 0
Volume Flared 7
Measured Safety Pilot 156
Continuous Assist 1,409
TOTAL FLARED 1,572
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-03
DESCRIPTION OF INCIDENTS & CAUSE
2
5
Startup purge and depressure during EaR compressor startup
Startup purge and depressure during EaR compressor startup
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned Startup discontinued and depressured
Unplanned EaR compressor startup completed
I Facility
LISBURNE PRODUCTION CENTER #1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
I Operator I Field(s)
BP EXPLORATION, ALASKA PRUDHOE BAY/PT MCINTYRE
Month/Year of Disposition
04/2003
Disposition
Volume MCF*
<Indicate contribution of each pool to total.
1. Sold
86,480
Pool Name
Code
2. Reinjected
5,648,370
LISBURNE
NIAKUK
N_PRUDHOE
PTMAC
W _BEACH
West Niakuk
640144
640148
640152
666100
640186
640149
3. Flared or vented less than 1 hour.
2,653
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235)
,/
7,874
5. Pilot and Purge
13,668
6. Used for lease operations
Fuel
Assist
718,413
210,169
7. Other
Percent
62.51%
2.72%
0.00%
33.20%
0.00%
1.56%
o
Lift Gas, Off Field
TOTAL items 1 - 7
6,687,627
1. Safety
8. NGL gas equivalent produced
86,480
2. Lease Use
9. Purchased gas
o
3. Conserv. Purposes
10. Transferred from:
c~nef~~ ~
tI<I&
o
11. Transferred to:
o
ì 874 MCF Oßf2...-
r
MCF
MCF
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
Remarks:
I hereby cef"r t}\at tMe foregoinn is true and correct to the best of my knowledge.
Signature: ~~. U. I ~~ ~ Title: MG (L TA-X Date: .sI/<tID3
Form 10-422 (Revised 4/95)
DATE
4/1/2003
4/12/2003
4/12/2003
4/14/2003
4/15/2003
4/16/2003
4/18/2003
4/20/2003
4/21/2003
4/23/2003
4/24/2003
4/25/2003
4/4/2003
4/12/2003
Volume Flared
TIME
1352-1354
0309-0355
0718-0733
2053-2106
0242-2109 (Intermittent)
0323-0345
1718-1730
1649-2349 (Intermittent)
1456-1507
0825-1215 (Intermittent)
0331-1351 (Intermittent)
2147-2232 (Intermittent)
VOLUME
(MSCF)
o
174
37
65
143
57
21
208
29
87
119
o
Total Flare <= 1 Hour 940
0045-1250 (Intermittent)
1507-1918 (Intermittent)
Total Flare> 1 Hour
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
3,726
3,410
7,136
8,076
8,402
133,729
150,207
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-03
DESCRIPTION OF INCIDENTS & CAUSE
SD EaR compressor 1830 to prepare for upcoming maintenance
Compressor 1800 went down on low suction pressure, would not restart-
Compressor 1801 went down on low suction pressure
Compressor 1801 went down on low suction pressure
Compressor 1801 went down on low suction pressure due to common line
Compressor 1801 went down on low suction pressure due to common line
Compressor 1800 went down on low suction pressure due to common line
Start attempts and shutdowns of 1808 T/C reinjection
SD compressor 1800 due to high level in suction scrubber
SD compressor 1807 for inspection and water wash, replaced communication
SD compressor 1808 for post overhaul gearbox inspection
MI Compressor 1830 startup
SD compressor 1808 for planned maintenance
Bleeding down west side production line in prep. For removal of stuck guage pig
/
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Planned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Planned
Unplanned
Unplanned
Planned
Unplanned
Completed the shut down
Started backup compressor 1801
Compressor 1801 restarted and online
Compressor 1801 restarted and online
Compressor 1801 restarted and online
Compressor 1801 restarted and online
Restarted turbine
1808 T/C reinjection machine depressured
Restarted compressor 1800
Shut down and completed depressure of compressor 1807
1808 initial depressurization completed, flare valve closed
MI Compressor 1830 on line
Planned maintenance to proceed
Production line bled down
DATE
04/01/03
04/12/03
04/12/03
04/14/03
04/15/03
04/16/03
04/18/03
04/20/03
04/21/03
04/23/03
04/24/03
04/25/03
04/04/03
04/12/03
Volume Flared
TIME
1352-1354
0309-0355
0718-0733
2053-2106
0242-2109 (Intermittent)
0323-0345
1718-1730
1649-2349 (Intermittent)
1456-1507
0825-1215 (Intermittent)
0331-1351 (Intermittent)
2147-2232 (Intermittent)
VOLUME
(MSCF)
22
11
3
20
184
95
62
600
71
217
202
92
Total Flare <= 1 Hour 1,579
0045-1250 (Intermittent)
1507-1918 (Intermittent)
Total Flare> 1 Hour
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
38
228
266
1,845
4,616
65,857
72,318
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-03
DESCRIPTION OF INCIDENTS & CAUSE
SD EaR compressor 1830 to prepare for upcoming maintenance
Compressor 1800 went down on low suction pressure, would not restart-
Compressor 1801 went down on low suction pressure
Compressor 1801 went down on low suction pressure
Compressor 1801 went down on low suction pressure due to common line
Compressor 1801 went down on low suction pressure due to common line
Compressor 1800 went down on low suction pressure due to common line
Start attempts and shutdowns of 1808 T/C reinjection
SD compressor 1800 due to high level in suction scrubber
SD compressor 1807 for inspection and water wash, replaced
SD compressor 1808 for post overhaul gearbox inspection
MI Compressor 1830 startup
SD compressor 1808 for planned maintenance
Bleeding down west side production line in prep. For removal of stuck
./
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Planned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Planned
Unplanned
Unplanned
Planned
Unplanned
Completed the shut down
Started backup compressor 1801
Compressor 1801 restarted and online
Compressor 1801 restarted and online
Compressor 1801 restarted and online
Compressor 1801 restarted and online
Restarted turbine
1808 T/C reinjection machine depressured
Restarted compressor 1800
Shut down and completed depressure of compressor 1807
1808 initial depressurization completed, flare valve closed
MI Compressor 1830 on line
Planned maintenance to proceed
Production line bled down
DATE
04/01/03
04/12/03
04/12/03
04/14/03
04/15/03
04/16/03
04/18/03
04/20/03
04/21/03
04/23/03
04/24/03
04/25/03
04/04/03
04/12/03
Volume Flared
TIME
1352-1354
0309-0355
0718-0733
2053-2106
0242-2109 (Intermittent)
0323-0345
1718-1730
1649-2349 (Intermittent)
1456-1507
0825-1215 (Intermittent)
0331-1351 (Intermittent)
2147-2232 (Intermittent)
Total Flare <= 1 Hour 90
0045-1250 (Intermittent)
1507-1918 (Intermittent)
Total Flare> 1 Hour
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
VOLUME
(Mscf)
153
134
287
377
413
6,725
7,515
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-03
DESCRIPTION OF INCIDENTS & CAUSE
o
7
2
4
13
6
3
31
4
10
10
o
SD EaR compressor 1830 to prepare for upcoming maintenance
Compressor 1800 went down on low suction pressure, would not restart-
Compressor 1801 went down on low suction pressure
Compressor 1801 went down on low suction pressure
Compressor 1801 went down on low suction pressure due to common line
Compressor 1801 went down on low suction pressure due to common line
Compressor 1800 went down on low suction pressure due to common line
Start attempts and shutdowns of 1808 T/C reinjection
SD compressor 1800 due to high level in suction scrubber
SD compressor 1807 for inspection and water wash, replaced
SD compressor 1808 for post overhaul gearbox inspection
MI Compressor 1830 startup
SD compressor 1808 for planned maintenance
Bleeding down west side production line in prep. For removal of stuck
V'
PLANNED
UNPLANNED
Planned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Planned
Unplanned
Unplanned
Planned
Unplanned
ACTION TAKEN TO ELIMINATE CAUSE
Completed the shut down
Started backup compressor 1801
Compressor 1801 restarted and online
Compressor 1801 restarted and online
Compressor 1801 restarted and online
Compressor 1801 restarted and online
Restarted turbine
1808 T/C reinjection machine depressured
Restarted compressor 1800
Shut down and completed depressure of compressor 1807
1808 initial depressurization completed, flare valve closed
MI Compressor 1830 on line
Planned maintenance to proceed
Production line bled down
DATE
04/01/03
04/12/03
04/12/03
04/14/03
04/15/03
04/16/03
04/18/03
04/20/03
04/21/03
04/23/03
04/24/03
04/25/03
04/04/03
04/12/03
Volume Flared
TIME
1352-1354
0309-0355
0718-0733
2053-2106
0242-2109 (Intermittent)
0323-0345
1718-1730
1649-2349 (Intermittent)
1456-1507
0825-1215 (Intermittent)
0331-1351 (Intermittent)
2147-2232 (Intermittent)
Total Flare <= 1 Hour 44
0045-1250 (Intermittent)
1507-1918 (Intermittent)
Total Flare> 1 Hour
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
VOLUME
(Mscf)
185
229
237
3,858
4,324
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-03
DESCRIPTION OF INCIDENTS & CAUSE
o
4
1
1
9
3
1
9
2
7
7
o
SD EaR compressor 1830 to prepare for upcoming maintenance
Compressor 1800 went down on low suction pressure, would not restart-
Compressor 1801 went down on low suction pressure
Compressor 1801 went down on low suction pressure
Compressor 1801 went down on low suction pressure due to common line
Compressor 1801 went down on low suction pressure due to common line
Compressor 1800 went down on low suction pressure due to common line
Start attempts and shutdowns of 1808 T/C reinjection
SD compressor 1800 due to high level in suction scrubber
SD compressor 1807 for inspection and water wash, replaced
SD compressor 1808 for post overhaul gearbox inspection
MI Compressor 1830 startup
98
87
SD compressor 1808 for planned maintenance
Bleeding down west side production line in prep. For removal of stuck
./
PLANNED
UNPLANNED
Planned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Planned
Unplanned
Unplanned
Planned
Unplanned
ACTION TAKEN TO ELIMINATE CAUSE
Completed the shut down
Started backup compressor 1801
Compressor 1801 restarted and online
Compressor 1801 restarted and online
Compressor 1801 restarted and online
Compressor 1801 restarted and online
Restarted turbine
1808 T/C reinjection machine depressured
Restarted compressor 1800
Shut down and completed depressure of compressor 1807
1808 initial depressurization completed, flare valve closed
MI Compressor 1830 on line
Planned maintenance to proceed
Production line bled down
DATE
04/01/03
04/12/03
04/12/03
04/14/03
04/15/03
04/16/03
04/18/03
04/20/03
04/21/03
04/23/03
04/24/03
04/25/03
04/04/03
04/12/03
TIME
1352-1354
0309-0355
0718-0733
2053-2106
0242-2109 (Intermittent)
0323-0345
1718-1730
1649-2349 (Intermittent)
1456-1507
0825-1215 (Intermittent)
0331-1351 (Intermittent)
2147-2232 (Intermittent)
Total Flare <= 1 Hour 0
0045-1250 (Intermittent)
1507-1918 (Intermittent)
Total Flare> 1 Hour 0
VOLUME
(MSCF)
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-03
DESCRIPTION OF INCIDENTS & CAUSE
o
o
o
o
o
o
o
o
o
o
o
o
SD EaR compressor 1830 to prepare for upcoming maintenance
Compressor 1800 went down on low suction pressure, would not restart-
Compressor 1801 went down on low suction pressure
Compressor 1801 went down on low suction pressure
Compressor 1801 went down on low suction pressure due to common line
Compressor 1801 went down on low suction pressure due to common line
Compressor 1800 went down on low suction pressure due to common line
Start attempts and shutdowns of 1808 T/C reinjection
SD compressor 1800 due to high level in suction scrubber
SD compressor 1807 for inspection and water wash, replaced
SD compressor 1808 for post overhaul gearbox inspection
MI Compressor 1830 startup
o
o
SD compressor 1808 for planned maintenance
Bleeding down west side production line in prep. For removal of stuck
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Planned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Planned
Unplanned
Unplanned
Planned
Unplanned
Completed the shut down
Started backup compressor 1801
Compressor 1801 restarted and online
Compressor 1801 restarted and online
Compressor 1801 restarted and online
Compressor 1801 restarted and online
Restarted turbine
1808 T/C reinjection machine depressured
Restarted compressor 1800
Shut down and completed depressure of compressor 1807
1808 initial depressurization completed, flare valve closed
MI Compressor 1830 on line
Planned maintenance to proceed
Production line bled down
DATE
04/01/03
04/12/03
04/12/03
04/14/03
04/15/03
04/16/03
04/18/03
04/20/03
04/21/03
04/23/03
04/24/03
04/25/03
04/04/03
04/12/03
TIME
1352-1354
0309-0355
0718-0733
2053-2106
0242-2109 (Intermittent)
0323-0345
1718-1730
1649-2349 (Intermittent)
1456-1507
0825-1215 (Intermittent)
0331-1351 (Intermittent)
2147-2232 (Intermittent)
Total Flare <= 1 Hour 0
0045-1250 (Intermittent)
1507-1918 (Intermittent)
Total Flare> 1 Hour 0
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-03
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
o
o
o
o
o
o
o
o
o
o
o
SD EaR compressor 1830 to prepare for upcoming maintenance
Compressor 1800 went down on low suction pressure, would not restart-
Compressor 1801 went down on low suction pressure
Compressor 1801 went down on low suction pressure
Compressor 1801 went down on low suction pressure due to common line
Compressor 1801 went down on low suction pressure due to common line
Compressor 1800 went down on low suction pressure due to common line
Start attempts and shutdowns of 1808 T/C reinjection
SD compressor 1800 due to high level in suction scrubber
SD compressor 1807 for inspection and water wash, replaced
SD compressor 1808 for post overhaul gearbox inspection
MI Compressor 1830 startup
o
o
SD compressor 1808 for planned maintenance
Bleeding down west side production line in prep. For removal of stuck
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Planned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Planned
Unplanned
Unplanned
Planned
Unplanned
Completed the shut down
Started backup compressor 1801
Compressor 1801 restarted and online
Compressor 1801 restarted and online
Compressor 1801 restarted and online
Compressor 1801 restarted and online
Restarted turbine
1808 T/C reinjection machine depressured
Restarted compressor 1800
Shut down and completed depressure of compressor 1807
1808 initial depressurization completed, flare valve closed
MI Compressor 1830 on line
Planned maintenance to proceed
Production line bled down
FACILITY: LPC
SYSTEM
1. Flare/Relief Valve
REPORT NO: 03-0163
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 01 Apr 2003
TIME OF FLARING
Start Stop Duration
13:52 13:54 0 Hrs 2 Mins
Black
Intermittent Smoke
D D
Planned
g
TOTAL VOLUME
First Determination of Cause: .
1. Shut down EOR compressor 1830, to prepare for upcoming turn around.
Action Taken to Stop Flaring:
1. Completed the shut down.
Wednesday, April 30, 2003
VOLUME
22 MSCF
22 MSCF
Page 1 of 1
REPORT NO: 03-0250
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: LPC
DATE: 23 Apr 2003
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
08:25 08:29 OHrs 4Mins D D g 221 MSCF
12:12 12:15 OHrs 3Mins D D ¡;t 101 MSCF
TOTAL VOLUME 322 MSCF
First Determination of Cause:
1. Shutdown 1807 for inspection and water wash.
2. Replaced communication link on 1807.
Action Taken to Stop Flaring:
1. Shutdown 1807
2. Completed depressurize of 1807.
Wednesday, April 30, 2003
Page 1 of 1
REPORT NO: 03-0206
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: LPC- DATE: 12 Apr 2003
TIME OF FLARING
SYSTEM Start Stop Duration
1. Flare/Relief Valve 07:18 07:33 0 Hrs 15 Mins
2. Controlled Blowdow 15:07 19: 18 4 Hrs 11 Mins
Black
Intermittent Smoke Planned VOLUME
D 0 D 43 MSCF
~ 0 D 3,859 MSCF
TOTAL VOLUME 3,902 MSCF
First Determination of Cause:
1. STV /IP T/C 1801 went down on low suction pressure. This was through the LP flare tip.
2. Bleeding down of west side production line in preparation for removal of stuck gauge pig. This was
through the HP flare tip.
Action Taken to Stop Flaring:
1. STV /IP T/C 1801 restarted and online.
2. Production line bled down.
Wednesday, April 30, 2003
Page 1 of 1
REPORT NO: 03-0179
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: LPC
DATE: 04 Apr 2003
SYSTEM
1. Flare/Relief Valve
TIME OF FLARING
Start Stop Duration
00:45 12:50 12 Hrs 5 Mins
Black
Intermittent Smoke
~ D
Planned VOLUME
~ 4,015 MSCF
TOTAL VOLUME 4,015 MSCF
First Determination of Cause:
1. Shut down T/C 1808 for turnaround.
Action Taken to Stop Flaring:
1.
Wednesday, April 30, 2003
Page 1 of 1
IFacility
LISBURNE PRODUCTION CENTER #1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
I Operator I Field(s)
BP EXPLORATION, ALASKA PRUDHOE BAY/PT MCINTYRE
Month/Year of Disposition
OS/2003
Disposition
Volume MCF'
'Indicate contribution of each pool to total.
1. Sold
119,198
Pool Name
Code
2. Reinjected
9,132,657
LISBURNE
NIAKUK
N_PRUDHOE
PTMAC
W _BEACH
West Niakuk
640144
640148
640152
666100
640186
640149
3. Flared or vented less than 1 hour.
182
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235)
o
5. Pilot and Purge
13,780
6. Used for lease operations
Fuel
Assist
1,033,297
152,642
7. Other
Lift Gas, Off Field
264,967
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
TOTAL items 1 - 7
10,716,723
1. Safety
8. NGL gas equivalent produced
119,198
2. Lease Use
9. Purchased gas
o
3. Conserv. Purposes
10. Transferred from:
o
Commissioner
Date
11. Transferred to:
o
Remarks:
that the foregoing is true and correct to the best of my knowledge.
~ Title:\M. ~ Date:/-7-0)
"
Percent
56.77%
1.92%
0.00%
40.21 %
0.00%
1.10%
MCF
MCF
MCF
DATE
5/1/2003
5/2/2003
5/14/2003
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-03
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
1633-1634
0332-0426
1318-1333
o
o
59
Total Flare <= 1 Hour 59
Volume Flared 59
Total Flare> 1 Hour 0
Measured Safety Pilot 7,810
Continuous Assist 86,353
TOTAL FLARED 94,222
Lost EaR compressor 1830 due to plant upset
Venting during compressor 1830 startup
Compressor 1800 SD due to fuel control system problem
Unplanned
Planned
Unplanned
Venting complete
Compressor 1830 started and online
Restarted compressor 1800
DATE
05/01/03
05/02/03
05/14/03
Volume Flared
TIME
1633-1634
0332-0426
1318-1333
Total Flare <= 1 Hour
Total Flare> 1 Hour
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-03
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
23
56
41
120
120
5,552
61,652
67,324
Lost EaR compressor 1830 due to plant upset
Venting during compressor 1830 startup
Compressor 1800 SD due to fuel control system problem
Unplanned
Planned
Unplanned
o
Venting complete
Compressor 1830 started and online
Restarted compressor 1800
DATE
05/01/03
05/02/03
05/14/03
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-03
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
1633-1634
0332-0426
1318-1333
Total Flare <= 1 Hour 0
Volume Flared 0
Total Flare> 1 Hour 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
o
o
o
Lost EaR compressor 1830 due to plant upset
Venting during compressor 1830 startup
Compressor 1800 SD due to fuel control system problem
Unplanned
Planned
Unplanned
Venting complete
Compressor 1830 started and online
Restarted compressor 1800
DATE
05/01/03
05/02/03
05/14/03
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-03
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
1633-1634
0332-0426
1318-1333
Total Flare <= 1 Hour 0
Volume Flared 0
Total Flare> 1 Hour 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
o
o
o
Lost EaR compressor 1830 due to plant upset
Venting during compressor 1830 startup
Compressor 1800 SD due to fuel control system problem
Unplanned
Planned
Unplanned
Venting complete
Compressor 1830 started and online
Restarted compressor 1800
DATE
05/01/03
05/02/03
05/14/03
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-03
TIME
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
1633-1634
0332-0426
1318-1333
Total Flare <= 1 Hour 2
Volume Flared 2
Total Flare> 1 Hour 0
Measured Safety Pilot 265
Continuous Assist 2,938
TOTAL FLARED 3,205
o
o
2
Lost EaR compressor 1830 due to plant upset
Venting during compressor 1830 startup
Compressor 1800 SD due to fuel control system problem
Unplanned
Planned
Unplanned
Venting complete
Compressor 1830 started and online
Restarted compressor 1800
DATE
05/01/03
05/02/03
05/14/03
Volume Flared
TIME
1633-1634
0332-0426
1318-1333
Total Flare <= 1 Hour
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-03
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare> 1 Hour 0
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
153
1,699
1,853
o
o
1
Lost EaR compressor 1830 due to plant upset
Venting during compressor 1830 startup
Compressor 1800 SD due to fuel control system problem
Unplanned
Planned
Unplanned
Venting complete
Compressor 1830 started and online
Restarted compressor 1800
I Facility
LISBURNE PRODUCTION CENTER #1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
loperator - IField(S)
BP EXPLORATION, ALASKA PRUDHOE BAY/PT MCINTYRE
I Month/Year of Disposition
06/2003
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
1. Sold
105,347
Pool Name
Code
2. Reinjected
8,593,480
LISBURNE
NIAKUK
N_PRUDHOE
PTMAC
W _BEACH
West Niakuk
640144
640148
640152
666100
640186
640149
3. Flared or vented less than 1 hour.
2,810
4. Flared or vented greater than 1 hour
(Supplemental report requirednSee 20 AAC 25.235)
o
5. Pilot and Purge
13,248
6. Used for lease operations
Fuel
Assist
_ _ 928,576
(ð 9 Y7(Jtt 166,128
Percent
50.57%
1.93%
0.00%
45.73%
0.58%
1.19%
7. Other
47,157
Lift Gas, Off Field
TOTAL items 1 - 7
9,856,746
1. Safety
8. NGL gas equivalent produced
105,347
2. Lease Use
9. Purchased gas
o
3. Conserv. Purposes
10. Transferred from:
o
Commissioner
11. Transferred to:
o
MCF
MCF
MCF
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
Remarks:
I hereby ce~ that tf'e fO;?egOin is true and correct to the best of my knowledge.
Signature: «'.0. I\... Á _LJ.. Title: ~fL ("P(~ Date: 7/n/o>
Form 10-422 (Revised 4/95
VOLUME
DATE TIME (MSCF)
6/4/2003 1628-1629 0
6/5/2003 0113-0421 (Intermittent) 0
6/7/2003 2036-2130 (ntermittent) 0
6/8/2003 0234-2046 (Intermittent) 0
6/26/2003 1514-2306 (Intermittent) 1,071
6/28/2003 1349-1448 (Intermittent) 101
6/29/2003 1405-1426 (Intermittent) 0
6/30/2003 0457-1635 (Intermittent) 0
Total Flare <= 1 Hour
1,172
Total Flare> 1 Hour
Volume Flared
1,172
Measured Safety Pilot
Continuous Assist
6,686
83,926
TOTAL FLARED
91,784
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-03
DESCRIPTION OF INCIDENTS & CAUSE
EaR compressor 1830 went down
MI compressor in inadvertent loading step for possible startup
MI compo Unknown shutdown, Intermittent venting while starting MI corn pressor
Intermittent venting while starting MI compressor
T/C 1807 SD due to fuel gas valve failure. EaR compressor aso SD due to gas
Startup of 1830 EaR compressor
1830 EaR compressor had an upset due to high ambient conditions
1830 EaR compressor SD due to control problems
o
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Planned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
venting complete
MI compressor backed down to beginning step in prep. For startup
MI machine online
MI machine blowdown completed and compressor online.
1807 & 1830 Compressors SD and depressured
Compressor startup completed
Increased gas flow into compressor
Loaded up 1855 Off gas compressor, compo 1830 stopped venting
DATE
06/04/03
06/05/03
06/07/03
06/08/03
06/26/03
06/28/03
06/29/03
06/30/03
Volume Flared
TIME
1628-1629
0113-0421 (Intermittent)
2036-2130 (ntermittent)
0234-2046 (Intermittent)
1514-2306 (Intermittent)
1349-1448 (Intermittent)
1405-1426 (Intermittent)
0457-1635 (Intermittent)
Total Flare <= 1 Hour
Total Flare> 1 Hour
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-03
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
22
62
75
75
1,088
83
71
39
1,515
1,515
6,055
75,831
83,401
EaR compressor 1830 went down
MI compressor in inadvertent loading step for possible startup
MI compo Unknown shutdown, Intermittent venting while starting MI
Intermittent venting while starting MI compressor
T/C 1807 SD due to fuel gas valve failure. EaR compressor aso SD due to
Startup of 1830 EaR compressor
1830 EaR compressor had an upset due to high ambient conditions
1830 EaR compressor SD due to control problems
o
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Planned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
venting complete
MI compressor backed down to beginning step in prep. For startup
MI machine online
MI machine blowdown completed and compressor online.
1807 & 1830 Compressors SD and depressured
Compressor startup completed
Increased gas flow into compressor
Loaded up 1855 Off gas compressor, compo 1830 stopped venting
DATE
06/04/03
06/05/03
06/07/03
06/08/03
06/26/03
06/28/03
06/29/03
06/30/03
TIME
1628-1629
0113-0421 (Intermittent)
2036-2130 (ntermittent)
0234-2046 (Intermittent)
1514-2306 (Intermittent)
1349-1448 (Intermittent)
1405-1426 (Intermittent)
0457-1635 (Intermittent)
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-03
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
Total Flare <= 1 Hour 32
Total Flare> 1 Hour 0
Volume Flared 32
Measured Safety Pilot 83
Continuous Assist 1,040
TOTAL FLARED 1,155
o
o
o
o
30
2
o
o
EaR compressor 1830 went down
MI compressor in inadvertent loading step for possible startup
MI compo Unknown shutdown, Intermittent venting while starting MI
Intermittent venting while starting MI compressor
T/C 1807 SD due to fuel gas valve failure. EaR compressor aso SD due to
Startup of 1830 EaR compressor
1830 EaR compressor had an upset due to high ambient conditions
1830 EaR compressor SD due to control problems
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Planned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
venting complete
MI compressor backed down to beginning step in prep. For startup
MI machine online
MI machine blowdown completed and compressor online.
1807 & 1830 Compressors SD and depressured
Compressor startup completed
Increased gas flow into compressor
Loaded up 1855 Off gas compressor, compo 1830 stopped venting
DATE
06/04/03
06/05/03
06/07/03
06/08/03
06/26/03
06/28/03
06/29/03
06/30/03
TIME
1628-1629
0113-0421 (Intermittent)
2036-2130 (ntermittent)
0234-2046 (Intermittent)
1514-2306 (Intermittent)
1349-1448 (Intermittent)
1405-1426 (Intermittent)
0457-1635 (Intermittent)
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-03
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
o
o
o
o
o
o
o
o
EaR compressor 1830 went down
MI compressor in inadvertent loading step for possible startup
MI compo Unknown shutdown, Intermittent venting while starting MI
Intermittent venting while starting MI compressor
T/C 1807 SD due to fuel gas valve failure. EaR compressor aso SD due to
Startup of 1830 EaR compressor
1830 EaR compressor had an upset due to high ambient conditions
1830 EaR compressor SD due to control problems
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Planned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
venting complete
MI compressor backed down to beginning step in prep. For startup
MI machine online
MI machine blowdown completed and compressor online.
1807 & 1830 Compressors SD and depressured
Compressor startup completed
Increased gas flow into compressor
Loaded up 1855 Off gas compressor, compo 1830 stopped venting
DATE
06/04/03
06/05/03
06/07/03
06/08/03
06/26/03
06/28/03
06/29/03
06/30/03
TIME
1628-1629
0113-0421 (Intermittent)
2036-2130 (ntermittent)
0234-2046 (Intermittent)
1514-2306 (Intermittent)
1349-1448 (Intermittent)
1405-1426 (Intermittent)
0457-1635 (Intermittent)
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-03
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
Total Flare <= 1 Hour 56
Total Flare> 1 Hour 0
Volume Flared 56
Measured Safety Pilot 262
Continuous Assist 3,292
TOTAL FLARED 3,610
o
o
o
o
52
4
o
o
EaR compressor 1830 went down
MI compressor in inadvertent loading step for possible startup
MI compo Unknown shutdown, Intermittent venting while starting MI
Intermittent venting while starting MI compressor
T/C 1807 SD due to fuel gas valve failure. EaR compressor aso SD due to
Startup of 1830 EaR compressor
1830 EaR compressor had an upset due to high ambient conditions
1830 EaR compressor SD due to control problems
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Planned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
venting complete
MI compressor backed down to beginning step in prep. For startup
MI machine online
MI machine blowdown completed and compressor online.
1807 & 1830 Compressors SD and depressured
Compressor startup completed
Increased gas flow into compressor
Loaded up 1855 Off gas compressor, compo 1830 stopped venting
DATE
06/04/03
06/05/03
06/07/03
06/08/03
06/26/03
06/28/03
06/29/03
06/30/03
TIME
1628-1629
0113-0421 (Intermittent)
2036-2130 (ntermittent)
0234-2046 (Intermittent)
1514-2306 (Intermittent)
1349-1448 (Intermittent)
1405-1426 (Intermittent)
0457-1635 (Intermittent)
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-03
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
Total Flare <= 1 Hour 35
Total Flare> 1 Hour 0
Volume Flared 35
Measured Safety Pilot 162
Continuous Assist 2,039
TOTAL FLARED 2,236
o
o
o
o
33
2
o
o
EaR compressor 1830 went down
MI compressor in inadvertent loading step for possible startup
MI compo Unknown shutdown, Intermittent venting while starting MI
Intermittent venting while starting MI compressor
T/C 1807 SD due to fuel gas valve failure. EaR compressor aso SD due to
Startup of 1830 EaR compressor
1830 EaR compressor had an upset due to high ambient conditions
1830 EaR compressor SD due to control problems
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Planned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
venting complete
MI compressor backed down to beginning step in prep. For startup
MI machine online
MI machine blowdown completed and compressor online.
1807 & 1830 Compressors SD and depressured
Compressor startup completed
Increased gas flow into compressor
Loaded up 1855 Off gas compressor, compo 1830 stopped venting
bp
FACILITY: LPC
SYSTEM
1. Flare/Relief Valve
REPORT NO: 03-0363
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 07 Jun 2003
TIME OF FLARING
Start Stop Duration
20:36 21:30 OHrs 54Mins
First Determination of Cause:
1. Intermittent venting while starting MI machine.
Action Taken to Stop Flaring:
1. MI machine online.
Tuesday, June 17, 2003
Black
Intermittent Smoke
~ 0
Planned
TOTAL VOLUME
~
VOLUME
75 MSCF
75 MSCF
Page 1 of 1
I Facility
LISBURNE PRODUCTION CENTER #1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
loperator I Field(s)
BP EXPLORATION, ALASKA PRUDHOE BAY/PT MCINTYRE
Month/Year of Disposition
07/2003
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
1. Sold
Pool Name
Code
73,958
2. Reinjected
LISBURNE
NIAKUK
N_PRUDHOE
PTMAC
W _BEACH
West Niakuk
640144
640148
640152
666100
640186
640149
7,929,598
3. Flared or vented less than 1 hour.
1,074
4. Flared or vented greater than 1 hour
(Supplemental report required-oSee 20 AAC 25.235)
o
5. Pilot and Purge
13,636
6. Used for lease operations
Fuel
Assist
846,935
202,178
Percent
44.02%
2.12%
0.00%
51.48%
1.10%
1.28%
7. Other
72,122
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
Lift Gas, Off Field
TOTAL items 1 - 7
9,139,501
1. Safety
8. NGL gas equivalent produced
73,958
2. Lease Use
9. Purchased gas
o
3. Conserv. Purposes
10. Transferred from:
o
Commissioner
11. Transferred to:
o
Remarks:
I ~erebY ce~ that t
Signature: , ¿. O.
Form 10-422 (Revised 4/95)
is true and correct to the best of my knowledge.
Title: (J1,brL ~ Date: 8 ICf 107
MCF
MCF
MCF
Date
DATE
7/1/2003
m/2003
7/8/2003
7/14/2003
7/18/2003
7/20/2003
7/27/2003
7/28/2003
Volume Flared
TIME
0901-1025 (Intermittent)
0825-2003 (Intermittent)
0213-1923 (Intermittent)
0727-2015 (Intermittent)
0020-2359 (Intermittent)
0312-0513 (Intermittent)
0046-1746 (Intermittent)
0046-2315 (Intermittent)
Total Flare <= 1 Hour
Total Flare> 1 Hour
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul-03
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5,971
89,674
95,645
o
o
o
o
o
o
o
o
EaR 1830 MI Compressor startup attempts
EaR 1830 MI Compressor startup attempts
EaR 1830 MI Compressor startup attempts
Start and shutdown of EaR 1830 MI Compressor
EaR 1830 MI Compressor startup attempts
Depressured 1830 EaR Compressor after shutdown
EaR 1830 MI Compressor startup attempts
EaR 1830 MI Compressor startup attempts
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
o
o
o
Stopped attempting to start compressor. Insturmentation problems
Stopped attempting to start compressor. High ambient temperatures
Stopped atternpting to start compressor. High ambient temperatures
Put online to drillsites. Left shutdown and in standby.
Put online to drillsites. Left shutdown and in standby.
Completed depressure of compressor
Stopped attempting to start compressor. High ambient temperatures
EaR compressor startup completed
DATE
07/01/03
07/07/03
07/08/03
07/14/03
07/18/03
07/20/03
07/27/03
07/28/03
Volume Flared
TIME
0901-1025 (Intermittent)
0825-2003 (Intermittent)
0213-1923 (Intermittent)
0727-2015 (Intermittent)
0020-2359 (Intermittent)
0312-0513 (Intermittent)
0046-1746 (Intermittent)
0046-2315 (Intermittent)
Total Flare <= 1 Hour
Total Flare> 1 Hour
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul-03
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
137
182
65
202
169
21
184
114
1,074
1,074
7,043
103,422
111,539
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
EaR 1830 MI Compressor startup attempts
EaR 1830 MI Compressor startup attempts
EaR 1830 MI Compressor startup attempts
Start and shutdown of EaR 1830 MI Compressor
EaR 1830 MI Compressor startup attempts
Depressured 1830 EaR Compressor after shutdown
EaR 1830 MI Compressor startup attempts
EaR 1830 MI Compressor startup attempts
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
o
Stopped attempting to start compressor. Insturmentation problems
Stopped attempting to start compressor. High ambient temperatures
Stopped attempting to start compressor. High ambient temperatures
Put online to drillsites. Left shutdown and in standby.
Put online to drillsites. Left shutdown and in standby.
Completed depressure of compressor
Stopped attempting to start compressor. High ambient temperatures
EaR compressor startup completed
DATE
07/01/03
07/07/03
07/08/03
07/14/03
07/18/03
07/20/03
07/27/03
07/28/03
TIME
0901-1025 (Intermittent)
0825-2003 (Intermittent)
0213-1923 (Intermittent)
0727-2015 (Intermittent)
0020-2359 (Intermittent)
0312-0513 (Intermittent)
0046-1746 (Intermittent)
0046-2315 (Intermittent)
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul-03
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Volume Flared 0
Measured Safety Pilot 152
Continuous Assist 2,227
TOTAL FLARED 2,379
o
o
o
o
o
o
o
o
EaR 1830 MI Compressor startup attempts
EaR 1830 MI Compressor startup attempts
EaR 1830 MI Compressor startup attempts
Start and shutdown of EaR 1830 MI Compressor
EaR 1830 MI Compressor startup attempts
Depressured 1830 EaR Compressor after shutdown
EaR 1830 MI Compressor startup attempts
EaR 1830 MI Compressor startup attempts
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Stopped attempting to start compressor. Insturmentation problems
Stopped attempting to start compressor. High ambient ternperatures
Stopped attempting to start compressor. High ambient temperatures
Put online to drillsites. Left shutdown and in standby.
Put online to drillsites. Left shutdown and in standby.
Completed depressure of compressor
Stopped attempting to start compressor. High ambient temperatures
EaR compressor startup completed
DATE
07/01/03
07/07/03
07/08/03
07/14/03
07/18/03
07/20/03
07/27/03
07/28/03
TIME
0901-1025 (Intermittent)
0825-2003 (Intermittent)
0213-1923 (Intermittent)
0727-2015 (Intermittent)
0020-2359 (Intermittent)
0312-0513 (Intermittent)
0046-1746 (Intermittent)
0046-2315 (Intermittent)
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul-03
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
o
o
o
o
o
o
o
o
EaR 1830 MI Compressor startup attempts
EaR 1830 MI Compressor startup attempts
EaR 1830 MI Compressor startup attempts
Start and shutdown of EaR 1830 MI Compressor
EaR 1830 MI Compressor startup attempts
Depressured 1830 EaR Cornpressor after shutdown
EaR 1830 MI Compressor startup attempts
EaR 1830 MI Compressor startup attempts
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Stopped attempting to start compressor. Insturmentation problems
Stopped attempting to start !:ompressor. High ambient temperatures
Stopped attempting to start compressor. High ambient temperatures
Put online to drillsites. Left shutdown and in standby.
Put online to drillsites. Left shutdown and in standby.
Completed depressure of compressor
Stopped attempting to start compressor. High ambient temperatures
EaR compressor startup completed
DATE
07/01/03
07/07/03
07/08/03
07/14/03
07/18/03
07/20/03
07/27/03
07/28/03
TIME
0901-1025 (Intermittent)
0825-2003 (Intermittent)
0213-1923 (Intermittent)
0727-2015 (Intermittent)
0020-2359 (Intermittent)
0312-0513 (Intermittent)
0046-1746 (Intermittent)
0046-2315 (Intermittent)
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul-03
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Volume Flared 0
Measured Safety Pilot 294
Continuous Assist 4,272
TOTAL FLARED 4,566
o
o
o
o
o
o
o
o
EaR 1830 MI Compressor startup attempts
EaR 1830 MI Compressor startup attempts
EaR 1830 MI Compressor startup attempts
Start and shutdown of EaR 1830 MI Compressor
EaR 1830 MI Compressor startup attempts
Depressured 1830 EaR Compressor after shutdown
EaR 1830 MI Compressor startup attempts
EaR 1830 MI Compressor startup attempts
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Stopped attempting to start compressor. Insturmentation problems
Stopped attempting 10 SIRrt comprAssor High Ambient temperatures
Stopped attempting to start compressor. High ambient temperatures
Put online to drillsites. Left shutdown and in standby.
Put online to drillsites. Left shutdown and in standby.
Completed depressure of compressor
Stopped attempting to start compressor. High ambient temperatures
EaR compressor startup completed
DATE
07/01/03
07/07/03
07/08/03
07/14/03
07/18/03
07/20/03
07/27/03
07/28/03
TIME
0901-1025 (Intermittent)
0825-2003 (Intermittent)
0213-1923 (Intermittent)
0727-2015 (Intermittent)
0020-2359 (Intermittent)
0312-0513 (Intermittent)
0046-1746 (Intermittent)
0046-2315 (Intermittent)
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul-03
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Volume Flared 0
Measured Safety Pilot 176
Continuous Assist 2,583
TOTAL FLARED 2,759
o
o
o
o
o
o
o
o
EaR 1830 MI Compressor startup attempts
EaR 1830 MI Compressor startup attempts
EaR 1830 MI Compressor startup attempts
Start and shutdown of EaR 1830 MI Compressor
EaR 1830 MI Compressor startup attempts
Depressured 1830 EaR Compressor after shutdown
EaR 1830 MI Compressor startup attempts
EaR 1830 MI Compressor startup attempts
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Stopped attempting to start compressor. Insturmentation problerns
Stopped attempting to start comrrA~~or High RmhiAnt temperatures
Stopped attempting to start compressor. High ambient temperatures
Put online to drillsites. Left shutdown and in standby.
Put online to drillsites. Left shutdown and in standby.
Completed depressure of compressor
Stopped attempting to start compressor. High ambient temperatures
EaR compressor startup completed
I Facility
LISBURNE PRODUCTION CENTER #1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
operator I Field(s)
BP EXPLORATION, ALASKA PRUDHOE BAY/PT MCINTYRE
Month/Year of Disposition
08/2003
Disposition
1. Sold
2. Reinjected
3. Flared or vented less than 1 hour.
4. Flared or vented greater than 1 hour
(Supplemental report required-oSee 20 AAC 25.235)
5. Pilot and Purge
6. Used for lease operations
Fuel
Assist
7. Other
Lift Gas, Off Field
TOTAL items 1 - 7
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to:
Remarks:
I hereby ce~ that t~e foregoing is true and correct to the best of my knowledge.
Signature: \LQ. ~ A~ L-\ Title: 1'V\.(">(t, "fìOc"X Date:
Form 1 0-422 (Revised 4/95)
Volume MCF*
18,143
6,548,566
4,703
17,324
13,754
693,482
169,682
32,872
7,498,526
18,143
<t(n/o,
*Indicate contribution of each pool to total.
Pool Name
Code Percent
640144 61.26%
640148 2.24%
640152 0.00%
666100 34.87%
640186 0.58%
640149 1.05%
LISBURNE
NIAKUK
N_PRUDHOE
PTMAC
W _BEACH
~est Niakuk
1. Safety I 7, ? Z4~ MCF :1t..e-
2. Lease Use MCF
o
3. Conserv. Purposes MCF
o
~ ðL-JL ~ 1f'~~3
Commissioner Date
o
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
VOLUME
DATE TIME (MSCF)
8/14/2003 2300-2305 148
8/17/2003 1122-2108 (intermittent) 516
8/18/2003 0033-2338 (intermittent) 558
8/19/2003 2014-2312 (intermittent) 2,626
8/20/2003 0152-0453 (intermittent) 40
8/24/2003 1401-1453 (intermittent) 387
8/29/2003 1640-1727 (intermittent) 54
Total Flare <= 1 Hour 4,329
8/15/2003
8/23/2003
0222-1048 (intermittent)
1244-1551 (intermittent)
14,690
2,114
Total Flare> 1 Hour
16,804
Volume Flared
21,133
Measured Safety Pilot
Continuous Assist
9,162
121,704
TOTAL FLARED
151,999
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-03
DESCRIPTION OF INCIDENTS & CAUSE
Purge resulting from SD of 1808 Reinjection gas turbine compo For maintenance
Purging comps. 1807 & 1808 while SD of 1808 for maintenance
Depressuring common line for pigging and 1808 SD from water wash
Depressuring common line for pigging and 1808 SD from water wash
Nitrogen purge and depressure of compo 1808 to ready for energy isolation
Pre-start purge of Gas compo 1808
Startup of 1808 reinjection turbine/compressor
Depressurized drillsites common line for Smart-Pig job
Depressured common line after displacer Smart Pig run
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Planned
Planned
Planned
Planned
Planned
Planned
Planned
Planned
Planned
Shutdown completed
Shutdown completed
Shutdown completed
Shutdown completed
Depressured
Startup attempted
Shutdown completed
Depressurizing completed
Depressurizing completed
DATE
08/14/03
08/17/03
08/18/03
08/19/03
08/20/03
08/24/03
08/29/03
08/15/03
08/23/03
Volume Flared
TIME
2300-2305
1122-2108 (intermittent)
0033-2338 (intermittent)
2014-2312 (intermittent)
0152-0453 (intermittent)
1401-1453 (intermittent)
1640-1727 (intermittent)
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-03
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
90
o
o
o
o
o
143
Total Flare <= 1 Hour 233
0222-1048 (intermittent)
1244-1551 (intermittent)
Total Flare> 1 Hour
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
233
4,061
41,571
45,865
Purge resulting from SD of 1808 Reinjection gas turbine compo For
Purging comps. 1807 & 1808 while SD of 1808 for maintenance
Depressuring common line for pigging and 1808 SD from water wash
Depressuring common line for pigging and 1808 SD from water wash
Nitrogen purge and depressure of compo 1808 to ready for energy isolation
Pre-start purge of Gas compo 1808
Startup of 1808 reinjection turbine/compressor
o
o
Depressurized drillsites common line for Smart-Pig job
Depressured common line after displacer Smart Pig run
o
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Planned
Planned
Planned
Planned
Planned
Planned
Planned
Planned
Planned
Shutdown completed
Shutdown completed
Shutdown completed
Shutdown completed
Depressured
Startup attempted
Shutdown completed
Depressurizing completed
Depressurizing completed
DATE
08/14/03
08/17/03
08/18/03
08/19/03
08/20/03
08/24/03
08/29/03
08/15/03
08/23/03
TIME
2300-2305
1122-2108 (intermittent)
0033-2338 (intermittent)
2014-2312 (intermittent)
0152-0453 (intermittent)
1401-1453 (intermittent)
1640-1727 (intermittent)
Total Flare <= 1 Hour 2
0222-1048 (intermittent)
1244-1551 (intermittent)
Total Flare> 1 Hour 0
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-03
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
Volume Flared 2
Measured Safety Pilot 65
Continuous Assist 576
TOTAL FLARED 643
2
o
o
o
o
o
o
Purge resulting from SD of 1808 Reinjection gas turbine compo For
Purging comps. 1807 & 1808 while SD of 1808 for maintenance
Depressuring common line for pigging and 1808 SD from water wash
Depressuring common line for pigging and 1808 SD from water wash
Nitrogen purge and depressure of compo 1808 to ready for energy isolation
Pre-start purge of Gas compo 1808
Startup of 1808 reinjection turbine/compressor
o
o
Depressurized drillsites common line for Smart-Pig job
Depressured common line after displacer Smart Pig run
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Planned
Planned
Planned
Planned
Planned
Planned
Planned
Planned
Planned
Shutdown completed
Shutdown completed
Shutdown completed
Shutdown completed
Depressured
Startup attempted
Shutdown completed
Depressurizing completed
Depressurizing completed
DATE
08/14/03
08/17/03
08/18/03
08/19/03
08/20/03
08/24/03
08/29/03
08/15/03
08/23/03
TIME
2300-2305
1122-2108 (intermittent)
0033-2338 (intermittent)
2014-2312 (intermittent)
0152-0453 (intermittent)
1401-1453 (intermittent)
1640-1727 (intermittent)
Total Flare <= 1 Hour 0
0222-1048 (intermittent)
1244-1551 (intermittent)
Total Flare> 1 Hour 0
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-03
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
o
o
o
o
o
o
o
Purge resulting from SD of 1808 Reinjection gas turbine compo For
Purging comps. 1807 & 1808 while SD of 1808 for maintenance
Depressuring common line for pigging and 1808 SD from water wash
Depressuring common line for pigging and 1808 SD from water wash
Nitrogen purge and depressure of compo 1808 to ready for energy isolation
Pre-start purge of Gas compo 1808
Startup of 1808 reinjection turbine/compressor
o
o
Depressurized drillsites common line for Smart-Pig job
Depressured common line after displacer Smart Pig run
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Planned
Planned
Planned
Planned
Planned
Planned
Planned
Planned
Planned
Shutdown completed
Shutdown completed
Shutdown completed
Shutdown completed
Depressured
Startup attempted
Shutdown completed
Depressurizing completed
Depressurizing completed
DATE
08/14/03
08/17/03
08/18/03
08/19/03
08/20/03
08/24/03
08/29/03
08/15/03
08/23/03
TIME
2300-2305
1122-2108 (intermittent)
0033-2338 (intermittent)
2014-2312 (intermittent)
0152-0453 (intermittent)
1401-1453 (intermittent)
1640-1727 (intermittent)
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-03
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
Total Flare <= 1 Hour 109
0222-1048 (intermittent)
1244-1551 (intermittent)
354
47
Total Flare> 1 Hour 401
Volume Flared 510
Measured Safety Pilot 318
Continuous Assist 3,986
TOTAL FLARED 4,814
5
16
15
57
1
9
6
Purge resulting from SD of 1808 Reinjection gas turbine compo For
Purging comps. 1807 & 1808 while SD of 1808 for maintenance
Depressuring common line for pigging and 1808 SD from water wash
Depressuring common line for pigging and 1808 SD from water wash
Nitrogen purge and depressure of compo 1808 to ready for energy isolation
Pre-start purge of Gas compo 1808
Startup of 1808 reinjection turbine/compressor
Depressurized drillsites common line for Smart-Pig jOb
Depressured common line after displacer Smart Pig run
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Planned
Planned
Planned
Planned
Planned
Planned
Planned
Planned
Planned
Shutdown completed
Shutdown completed
Shutdown completed
Shutdown completed
Depressured
Startup attempted
Shutdown completed
Depressurizing completed
Depressurizing completed
DATE
08/14/03
08/17/03
08/18/03
08/19/03
08/20/03
08/24/03
08/29/03
08/15/03
08/23/03
TIME
2300-2305
1122-2108 (intermittent)
0033-2338 (intermittent)
2014-2312 (intermittent)
0152-0453 (intermittent)
1401-1453 (intermittent)
1640-1727 (intermittent)
Total Flare <= 1 Hour 30
0222-1048 (intermittent)
1244-1551 (intermittent)
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-03
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
Total Flare> 1 Hour 119
Volume Flared 149
Measured Safety Pilot 148
Continuous Assist 1,845
TOTAL FLARED 2,142
2
3
3
13
o
6
3
Purge resulting from SD of 1808 Reinjection gas turbine compo For
Purging comps. 1807 & 1808 while SD of 1808 for maintenance
Depressuring common line for pigging and 1808 SD from water wash
Depressuring common line for pigging and 1808 SD from water wash
Nitrogen purge and depressure of compo 1808 to ready for energy isolation
Pre-start purge of Gas compo 1808
Startup of 1808 reinjection turbine/compressor
80
39
Depressurized drillsites common line for Smart-Pig job
Depressured common line after displacer Smart Pig run
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Planned
Planned
Planned
Planned
Planned
Planned
Planned
Planned
Planned
Shutdown completed
Shutdown completed
Shutdown completed
Shutdown completed
Depressured
Startup attempted
Shutdown completed
Depressurizing completed
Depressurizing completed
REPORT NO: 03-0484
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: LPC
DATE: 14 Aug 2003
SYSTEM
1. Flare/Relief Valve
TIME OF FLARING
Start Stop Duration
23:00 23:05 0 Hrs 5Mins
Black
Intermittent Smoke
o D
Planned
d
VOLUME
247 MSCF
247 MSCF
TOTAL VOLUME
First Determination of Cause:
1. Purge resulting from shutdown of 52-1808 Reinjection Gas Turbine/Compressor for maintenance
during LPC Waterwheel Shutdown.
Action Taken to Stop Flaring:
1. Shutdown completed.
Friday, August 22, 2003
Page 1 of 1
REPORT NO: 03-0486
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: LPC DATE: 15 Aug 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 02:22 04:22 2Hrs OMins 0 0 g 4,876 MSCF
2. Flare/Relief Valve 04:24 04:45 OHrs 21 Mins 0 0 0' 741 MSCF
3. Flare/Relief Valve 05:53 10:48 4Hrs 55Mins D 0 ~ 9.507 MSCF
TOTAL VOLUME 15,124 MSCF
First Determination of Cause:
1. Oepressuring Orillsites Common-line for Smart-Pig job.
2. Oepressuring Orillsites Common-line for Smart-Pig job.
3. Oepressuring Orillsites Common-line for Smart-Pig job.
Action Taken to Stop Flaring:
1. Oepressuring paused.
2. Depressuring paused.
3. Oepressuring completed.
Friday, August 22, 2003
Page 1 of 1
REPORT NO: 03-0488
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: LPC DATE: 17 Aug 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. FlarelRelief Valve 11:22 11:25 OHrs 3Mins 0 D ~ 81 MSCF
2. Flare/Relief Valve 13:42 13:45 OHrs 3Mins D D g 79 MSCF
3. Flare/Relief Valve 17:06 17:12 OHrs 6Mins 0 0 g' 2G3MSCF
4. Flare/Relief Valve 18:42 18:44 OHrs 2Mins D D ~ 11 MSCF
5. Flare/Relief Valve 20:44 20:46 OHrs 2Mins D D ~ 21 MSCF
6. Flare/Relief Valve 21:05 21:08 OHrs 3Mins D D bi 80 MSCf
TOTAL VOLUME 535 MSCF
First Determination of Cause:
1. Pre-start purge of Reinjection Gas Turbine/Compressor 52-1807.
2. Start-up purge of Reinjection Gas Turbine/Compressor 52-1807.
3. Shutdown Reinjection Gas Turbine/Compressor 52-1808 for maintenance.
4. Reinjection Gas Turbine/Compressor 52-1808 case depressured on Seal OilleveJ trJp
(instrumentation malfunction).
5. Reinjection Gas Turbine/Compressor 52-1808 case depressured on Seal Oil level trip
(instrumentation malfunction).
6. System purge of Reinjection Gas Turbine/Compressor 52-1808 after fast-cooldown.
Action Taken to Stop Flaring:
1. Purge completed.
2. Start-up completed.
3. Shutdown completed.
Friday, August 22, 2003
Page 1 of 2
REPORT NO: 03-0489
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: LPC DATE: 18 Aug 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 00:33 00:36 OHrs 3Mins D D g 76 MSCF
2. Flare/Relief Valve 08:53 08:54 OHrs 1 Mins D D g' 11 MSCF
3. Flare/Relief Valve 08:56 09:05 OHrs 9Mins D D ~ ct26c.MSCF
4. Flare/Relief Valve 12:31 12:34 OHrs 3Mins D D ~ 86 MSCF
5. Flare/Relief Valve 23:33 23:38 OHrs 5Mins D D ~ 277 MSCF
TOTAL VOLUME "5'76 MSCF
First Determination of Cause:
1. Case depressure of Reinjection Gas Turbine/Compressor 52-1808 after fast-cooldown/shutdown.
2. Depressuring common line for pigging
3. Depressuring common line for pigging
4. 1808 shutdown from water wash
5. Emergency shutdown of Reinjection Gas Turbine/Compressor 52-1808 after gas I'eaktletected.
Action Taken to Stop Flaring:
1. Shutdown completed.
2. Common line depressured
3. Depressured common line
4. 1808 shutdown completed
5. Shutdown completed.
Friday, August 22, 2003
Page 1 of 1
REPORT NO: 03-0491
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: LPC DATE: 19 Aug 2003
TIME OF FLARING
SYSTEM Start Stop Duration
1. Flare/Relief Valve 20:14 20:19 OHrs 5Mins
2. Flare/Relief Valve 21 :16 22:11
3. Flare/Retief·,Valve . ·,22:l2·22:l5
4. Flare/Relief Valve 23:10 23:12
OHrs 55 Mins
~'¡"¡fS 3Mins
OHrs 2Mins
Black
Intermittent Smoke Planned VOL.,yME
0 0 ~ 283 MSCF
D 0 lit' 2,353 MSCF
0 D ~ 1ô,MSCF
D D d 44 MSCF
TOTAL VOLUME 2,696 MSCF
First Determination of Cause:
1. Shutdown purge of Reinjection Gas Turbine/Compressor 1808.
2. Depressure of Drillsites 24" common-line.
3. Depressure of Drillsites 24" common-line.
4. Case depressure of Reinjection Gas Turbine/Compressor 1808 for leak repair.
Action Taken to Stop Flaring:
1.
2. Depressured.
3. Depressure complete.
4. Case depressured.
Friday, August 22, 2003
Page 1 of 1
REPORT NO: 03-0490
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: LPC
DATE: 20 Aug 2003
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING
Start Stop Duration
01:52 01:54 OHrs 2Mins
04:51 04:53 0 Hrs 2Mins
Black
Intermittent Smoke
D 0
D D
Planned VOL1:fME
Iii 12 MSCF
¡;i 29 MSCF
TOTAL VOLUME
41''MSCf
First Determination of Cause:
1. Nitrogen purge and depressure of Reinjection Gas Turbine/Comp to ready for enrgy isolation.
2. Nitrogen purge and depressure of Reinjection Gas Turbine/Camp to ready for enrgy isolation.
Action Taken to Stop Flaring:
1. Depressured.
2. Depressured.
Friday, August 22, 2003
Page 1 of 1
REPORT NO: 03-0494
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: LPC
DATE: 23 Aug 2003
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
12:44 12:47 OHrs 3Mins 0 0 ~ 40 MSCF
14:16 15:51 1 Hrs 35 Mins 0 0 g 2,160 MSCF
TOTAL VOLUME" 2¡200~SGF
First Determination of Cause:
1. Oepressure OS common-line after Oisplacer Pig run.
2. Oepressure OS common-line after Smart Pig run.
Action Taken to Stop Flaring:
1. Oepressure completed.
2. Oepressure completed.
Monday,August25,2003
Page 1 of 1
REPORT NO: 03-0495
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: LPC DATE: 24 Aug 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 14:01 14:03 OHrs 2Mins D 0 ~ 31 MSCF
2. Flare/Relief Valve 14:13 14:17 OHrs 4Mins 0 D g 68 MSCF
3. Flare/Relief Valve 14:46 14:53 OHrs 7Mins 0 D Gi 3Oa.MSCF
TOTAL VOLUME 402 MSCF
First Determination of Cause:
1. Pre-start purge of Reinjection Gas Turbine/Compressor 1808.
2. Pre-start purge of Reinjection Gas Turbine/Compressor 1808.
3. Shutdown purge of Reinjection Gas Turbine/Compressor 1808 after leak detected inHP compressor.
Action Taken to Stop Flaring:
1. Continued start-up.
2. Continued start-up.
3. Shutdown completed.
Monday, August25,2003
Page 1 of 1
REPORT NO: 03-0498
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: LPC DATE: 29 Aug 2003
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 16:40 16:42 OHrs 2Mins 0 0 g 7 MSCF
2. Flare/Relief Valve 17:05 17:08 OHrs 3Mins 0 0 g' 12 MSCF
3. Flare/Relief Valve l7: 1{) 17:11 OHrs 1 Mins 0 0 5i HMSCF
4. Flare/Relief Valve 17:12 17:14 OHrs 2Mins D 0 ~ 8 MSCF
5. Flare/Relief Valve 17:17 17:18 OHrs 1 Mins 0 0 d 18 MSCF
6. Flare/Relief Valve 17:26 17:22 OHrs 2Mins 0 0 ø '80 MSCF
7. Flare/Relief Valve 17:25 17:27 OHrs 2Mins 0 D ~ 70 MSCF
TOTAL VOLUME 206 MSCF
First Determination of Cause:
1. Pre-start purge of 1808 reinjection turbine/compressor
2. Pre-start purge of 1808 reinjection turbine/compressor
3. Start-up of 1808 reinjection turbine/compressor
4. Start-up of 1808 reinjection turbine/compressor
5. Start-up of 1808 reinjection turbine/compressor
6. Start-up of 1808 reinjection turbine/compressor
7. Start-up of 1808 reinjection turbine/compressor
Action Taken to Stop Flaring:
1. Continued start-up procedure
2. Continued start-up procedure
Tuesday, September 02, 2003
Page 1 of 2
I Facility
LISBURNE PRODUCTION CENTER #1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
operator I Field(s)
BP EXPLORATION, ALASKA PRUDHOE BAY/PT MCINTYRE
Month/Year of Disposition
09/2003
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
1. Sold
72,861
Pool Name
Code
Percent
2. Reinjected
3. Flared or vented less than 1 hour.
1,368
LISBURNE
NIAKUK
N_PRUDHOE
PTMAC
W _BEACH
West Niakuk
640144
640148
640152
666100
640186
640149
56.44%
2.10%
0.00%
40.54%
0.00%
0.92%
8,586,772
4. Flared or vented greater than 1 hour
(Supplemental report required-oSee 20 AAC 25.235)
o
5. Pilot and Purge
13,074
6. Used for lease operations
Fuel
Assist
894,961
192,541
7. Other
Lift Gas, Off Field
83,165
TOTAL items 1 - 7
9,844,742
1. Safety
MCF
8. NGL gas equivalent produced
72,861
2. Lease Use
MCF
9. Purchased gas
o
3. Conserv. Purposes
MCF
10. Transferred from:
o
Commissioner
Date
11. Transferred to:
o
Remarks:
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
I hereby ceS" that the 10'09o;ng ;5 true and correct to the best of my knowledge. ( /
Signature: ! ~ Title: \/ o-e.~.t Date:!O l'f.{ 0 '3
Form 10-422 (Revis 4/95)
VOLUME
DATE TIME (MSCF)
9/5/2003 1544-2314 (Intermittent) 415
9/6/2003 0842-0938 329
9/13/2003 0311-1336 (Intermittent 57
9/22/2003 0937-2146 (Intermittent) 55
9/23/2003 0404-2139 (Intermittent) 110
Total Flare <= 1 Hour
966
Total Flare> 1 Hour
Volume Flared
966
Measured Safety Pilot
Continuous Assist
7,470
113,891
TOTAL FLARED
122,327
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-03
DESCRIPTION OF INCIDENTS & CAUSE
SD west side drill sites for possible common line leak and depressured common
1808 Compressor SD on high whru temp
Intermittent 15 mins. Flare time dur to start attempts of 1830 MI compressor
Startup attempts of the 1830 EaR Compressor
Startup attempts of the 1830 EaR Compressor
o
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Finished depressuring common'ine pressure
Restarted compressor
Trouble shooting of compressor over and compressor on standby
Shutdown/depressured 1830 EaR Compressor
Shutdown/depressured 1830 EaR Compressor
DATE
09/05/03
09/06/03
09/13/03
09/22/03
09/23/03
Volume Flared
TIME
1544-2314 (Intermittent)
0842-0938
0311-1336 (Intermittent
0937-2146 (Intermittent)
0404-2139 (Intermittent)
Total Flare <= 1 Hour
Total Flare> 1 Hour
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-03
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
179
o
44
44
89
356
356
5,206
72,714
78,276
SD west side drill sites for possible cornmon line leak and depressured
1808 Compressor SD on high whru temp
Intermittent 15 mins. Flare time dur to start attempts of 1830 MI compressor
Startup attempts of the 1830 EaR Cornpressor
Startup attempts of the 1830 EaR Compressor
o
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Finished depressuring commonline pressure
Restarted compressor
Trouble shooting of compressor over and compressor on standby
Shutdown/depressured 1830 EaR Compressor
Shutdown/depressured 1830 EaR Compressor
DATE
09/05/03
09/06/03
09/13/03
09/22/03
09/23/03
TIME
1544-2314 (Intermittent)
0842-0938
0311-1336 (Intermittent
0937-2146 (Intermittent)
0404-2139 (Intermittent)
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-03
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
o
o
o
o
o
SD west side drill sites for possible common line leak and depressured
1808 Compressor SD on high whru temp
Intermittent 15 mins. Flare time dur to start attempts of 1830 MI
Startup attempts of the 1830 EaR Compressor
Startup attempts of the 1830 EaR Compressor
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Finished depressuring commonline pressure
Restarted compressor
Trouble shooting of compressor over and compressor on standby
Shutdown/depressured 1830 EaR Compressor
Shutdown/depressured 1830 EaR Compressor
DATE
09/05/03
09/06/03
09/13/03
09/22/03
09/23/03
TIME
1544-2314 (Intermittent)
0842-0938
0311-1336 (Intermittent
0937-2146 (Intermittent)
0404-2139 (Intermittent)
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-03
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
o
o
o
o
o
SD west side drill sites for possible common line leak and depressured
1808 Compressor SD on high whru temp
Intermittent 15 mins. Flare time dur to start attempts of 1830 MI compressor
Startup attempts of the 1830 EaR Compressor
Startup attempts of the 1830 EaR Compressor
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Finished depressuring commonline pressure
Restarted compressor
Trouble shooting of compressor over and compressor on standby
Shutdown/depressured 1830 EaR Compressor
Shutdown/depressured 1830 EaR Compressor
DATE
09/05/03
09/06/03
09/13/03
09/22/03
09/23/03
TIME
1544-2314 (Intermittent)
0842-0938
0311-1336 (Intermittent
0937-2146 (Intermittent)
0404-2139 (Intermittent)
Total Flare <= 1 Hour 31
Total Flare> 1 Hour 0
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-03
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
Volume Flared 31
Measured Safety Pilot 277
Continuous Assist 4,114
TOTAL FLARED 4,422
14
10
2
2
3
SD west side drill sites for possible common line leak and depressured
1808 Compressor SD on high whru temp
Intermittent 15 mins. Flare time dur to start attempts of 1830 MI compressor
Startup attempts of the 1830 EaR Compressor
Startup attempts of the 1830 EaR Compressor
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Finished depressuring common line pressure
Restarted compressor
Trouble shooting of compressor over and compressor on standby
Shutdown/depressured 1830 EaR Compressor
Shutdown/depressured 1830 EaR Compressor
.. <i, 1
DATE
09/05/03
09/06/03
09/13/03
09/22/03
09/23/03
TIME
1544-2314 (Intermittent)
0842-0938
0311-1336 (Intermittent
0937-2146 (Intermittent)
0404-2139 (Intermittent)
Total Flare <= 1 Hour 15
Total Flare> 1 Hour 0
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-03
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
Volume Flared 15
Measured Safety Pilot 121
Continuous Assist 1,822
TOTAL FLARED 1,958
6
5
1
1
2
SD west side drill sites for possible common line leak and depressured
1808 Compressor SD on high whru temp
Intermittent 15 mins. Flare time dur to start attempts of 1830 MI compressor
Startup attempts of the 1830 EaR Compressor
Startup attempts of the 1830 EaR Compressor
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Finished depressuring commonline pressure
Restarted compressor
Trouble shooting of compressor over and compressor on standby
Shutdown/depressured 1830 EaR Compressor
Shutdown/depressured 1830 EaR Compressor
>"'.
I Facility
LISBURNE PRODUCTION CENTER #1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
operator I Field(s)
BP EXPLORATION, ALASKA PRUDHOE BAY/PT MCINTYRE
Month/Year of Disposition
10/2003
Disposition
Volume MCF*
-Indicate contribution of each pool to total.
1. Sold
127,917
Pool Name
Code
Percent
2. Reinjected
9,228,166
3. Flared or vented less than 1 hour.
437
LISBURNE
NIAKUK
N_PRUDHOE
PTMAC
W _BEACH
West Niakuk
640144
640148
640152
666100
640186
640149
51.01%
1.51%
0.00%
46.70%
0.00%
0.78%
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235)
o
5. Pilot and Purge
13,763
6. Used for lease operations
Fuel
Assist
1,017,670
164,989
7. Other
Lift Gas, Off Field
106,099
TOTAL items 1 - 7
10,659,041
1. Safety
MCF
8. NGL gas equivalent produced
127,917
2. Lease Use
MCF
9. Purchased gas
o
3. Conserv. Purposes
MCF
10. Transferred from:
o
Commissioner
Date
11. Transferred to:
o
I hereby ce~hat th, foregoing is true and correct to the best of my knowledge.
Signature: {..¿~Q. I\.~ Title: /I1I¡(j((, -(A><. Date:
Form 10-422 (Revised 4/95)
11/11/07,
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
Remarks:
DATE
10/3/2003
10/5/2003
10/6/2003
1 0/9/2003
10/10/2003
10/24/2003
1 0/28/2003
Volume Flared
TIME
1337-1548 (Intermittent)
1118-1723 (Intermttent)
0523-1804 (Intermittent)
1455-1718 (Intermittent)
0759-1002 (Intermittent)
1224-1225
1719-1734
Total Flare <= 1 Hour
Total Flare> 1 Hour
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-03
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
7,025
84,084
91,179
o
o
o
o
o
8
62
Attempting to start the MI compressor 4930
Trouble shooting and attempting to start the MI compressor 4930
Trouble shooting and attempting to start the MI compressor 4930
Trouble shooting MI compressor 4930
Trouble shooting MI compressor 4930
High pressure on Deproponizer tower during startup of NGL plant
1801 STV/IP compressor SD due to high temp. on bearing
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
70
o
70
Stopped MI startup attempts
Stopped MI startup attempts
Stopped M/ startup attempts
Completed troubleshooting
Completed troubleshooting
NGL plant retumed to service
1801 STV//P compressor restarted after SD condition cleared
DATE
10/03/03
10/05/03
10/06/03
1 0/09/03
10/10/03
10/24/03
1 0/28/03
Volume Flared
TIME
1337·1548 (Intermittent)
1118-1723 (Intermttent)
0523-1804 (Intermittent)
1455-1718 (Intermittent)
0759-1002 (Intermittent)
1224·1225
1719-1734
Total Flare <= 1 Hour
Total Flare> 1 Hour
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-03
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
51
64
67
61
56
7
58
364
364
6,421
77,076
83,861
Attempting to start the MI compressor 4930
Trouble shooting and attempting to start the MI compressor 4930
Trouble shooting and attempting to start the MI compressor 4930
Trouble shooting MI compressor 4930
Trouble shooting MI compressor 4930
High pressure on Deproponizer tower during startup of NGL plant
1801 STV/IP compressor SD due to high temp. on bearing
o
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Stopped MI startup attempts
Stopped MI startup attempts
Stopped MI startup attempts
Completed troubleshooting
Completed troubleshooting
NGL plant retumed to service
1801 STV//P compressor restarted after SD condition cleared
DATE
1 0/03/03
1 0/05/03
10/06/03
10/09/03
10/10/03
10/24/03
10/28/03
TIME
1337-1548 (Intermittent)
1118-1723 (Intermttent)
0523-1804 (Intermittent)
1455-1718 (Intermittent)
0759-1002 (Intermittent)
1224-1225
1719-1734
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-03
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
o
o
o
o
o
o
o
Attempting to start the MI compressor 4930
Trouble shooting and attempting to start the MI compressor 4930
Trouble shooting and attempting to start the MI compressor 4930
Trouble shooting MI compressor 4930
Trouble shooting MI compressor 4930
High pressure on Deproponizer tower during startup of NGL plant
1801 STV/IP compressor SD due to high temp. on bearing
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Stopped MI startup attempts
Stopped M/ startup attempts
Stopped MI startup attempts
Completed troubleshooting
Completed troubleshooting
NGL plant retumed to service
1801 STV//P compressor restarted after SD condition cleared
DATE
1 0/03/03
1 0/05/03
10/06/03
1 0/09/03
10/10/03
10/24/03
1 0/28/03
TIME
1337-1548 (Intermittent)
1118-1723 (Intermttent)
0523-1804 (Intermittent)
1455-1718 (Intermittent)
0759-1002 (Intermittent)
1224-1225
1719-1734
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-03
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
o
o
o
o
o
o
o
Attempting to start the MI compressor 4930
Trouble shooting and attempting to start the MI compressor 4930
Trouble shooting and attempting to start the MI compressor 4930
Trouble shooting MI cornpressor 4930
Trouble shooting MI compressor 4930
High pressure on Deproponizer tower during startup of NGL plant
1801 STV/IP compressor SD due to high temp. on bearing
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Stopped MI startup attempts
Stopped MI startup attempts
Stopped MI startup attempts
Completed troubleshooting
Completed troubleshooting
NGL plant returned to service
1801 STV/IP compressor restarted after SD condition cleared
DATE
10/03/03
1 0/05/03
10/06/03
1 0/09/03
10/10/03
10/24/03
1 0/28/03
TIME
1337-1548 (Intermittent)
1118-1723 (Intermttent)
0523-1804 (Intermittent)
1455-1718 (Intermittent)
0759-1002 (Intermittent)
1224-1225
1719-1734
Total Flare <= 1 Hour 2
Total Flare> 1 Hour 0
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-03
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
Volume Flared 2
Measured Safety Pilot 209
Continuous Assist 2,531
TOTAL FLARED 2,742
o
o
o
o
o
o
2
Attempting to start the MI compressor 4930
Trouble shooting and attempting to start the MI compressor 4930
Trouble shooting and attempting to start the MI compressor 4930
Trouble shooting MI compressor 4930
Trouble shooting MI compressor 4930
High pressure on Deproponizer tower during startup of NGL plant
1801 STV/IP compressor SD due to high temp. on bearing
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Stopped MI startup attempts
Stopped MI startup attempts
Stopped MI startup attempts
Completed troubleshooting
Completed troubleshooting
NGL plant returned to service
1801 STV/IP compressor restarted after SD condition cleared
·
DATE
10/03/03
1 0/05/03
10/06/03
10/09/03
10/10/03
10/24/03
1 0/28/03
Volume Flared
TIME
1337-1548 (Intermittent)
1118-1723 (Intermttent)
0523-1804 (Intermittent)
1455-1718 (Intermittent)
0759-1002 (Intermittent)
1224-1225
1719-1734
Total Flare <= 1 Hour
Total Flare> 1 Hour 0
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-03
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
108
1,298
1,407
o
o
o
o
o
o
1
Attempting to start the MI compressor 4930
Trouble shooting and attempting to start the M/ compressor 4930
Trouble shooting and attempting to start the MI corn pressor 4930
Trouble shooting MI compressor 4930
Trouble shooting MI compressor 4930
High pressure on Deproponizer tower during startup of NGL plant
1801 STV//P compressor SD due to high temp. on bearing
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Stopped MI startup attempts
Stopped MI startup attempts
Stopped MI startup attempts
Completed troubleshooting
Completed troubleshooting
NGL plant returned to service
1801 STV/IP compressor restarted after SD condition cleared
I Facility
LISBURNE PRODUCTION CENTER #1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
loperator IField(S)
BP EXPLORATION, ALASKA PRUDHOE BAY/PT MCINTYRE
I Month/Year of Disposition
11/2003
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
1. Sold
Pool Name
Code
134,128
2. Reinjected
LISBURNE
NIAKUK
N_PRUDHOE
PTMAC
W _BEACH
West Niakuk
640144
640148
640152
666100
640186
640149
9,522,325
3. Flared or vented less than 1 hour.
o
4. Flared or vented greater than 1 hour
(Supplemental report required-oSee 20 AAC 25.235)
o
5. Pilot and Purge
13,449
6. Used for lease operations
Fuel
Assist
985,463
108,911
Percent
52.45%
1.26%
0.00%
45.57%
0.00%
0.72%
7. Other
105,214
Lift Gas, Off Field
TOTAL items 1 - 7
10,869,490
1. Safety
8. NGL gas equivalent produced
134,128
2. Lease Use
9. Purchased gas
o
3. Conserv. Purposes
10. Transferred from:
o
Commissioner
11. Transferred to:
o
MCF
MCF
MCF
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
Remarks:
I hereby ce~ that Ire foregoing is true and correct to the best of my knowledge.
Signature: t¿{'t l \. ~ Title: f1tL0rL íP<k Date: I t/IS'/Ù3
Form 10-422 (Revised 4/95)
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-03
DATE
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 7,050
Continuous Assist 57,387
TOTAL FLARED 64,437
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-03
DATE
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 6,132
Continuous Assist 49,516
TOTAL FLARED 55,648
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-03
DATE
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-03
DATE
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-03
DATE
TIME
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 169
Continuous Assist 1,259
TOTAL FLARED 1,428
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-03
DATE
TIME
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 98
Continuous Assist 749
TOTAL FLARED 847
Facility
. LISBURNE PRODUCTION CENTER #1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
operator I Field(s)
BP EXPLORATION, ALASKA PRUDHOE BAY/PT MCINTYRE
I Month/Year of Disposition
12/2003
Disposition
Volume MCF*
"Indicate contribution of each pool to total.
1. Sold
138,725
Pool Name
Code
Percent
3. Flared or vented less than 1 hour.
162
LISBURNE
NIAKUK
N_PRUDHOE
PTMAC
W _BEACH
West Niakuk
640144
640148
640152
666100
640186
640149
49.74%
1.89%
0.00%
47.51%
0.00%
0.86%
2. Reinjected
9,848,983
4. Flared or vented greater than 1 hour
(Supplemental report required-oSee 20 AAC 25.235)
o
5. Pilot and Purge
13,990
6. Used for lease operations
Fuel
Assist
1,049,324
132,920
7. Other
Lift Gas, Off Field
98,454
TOTAL items 1 - 7
11,282,558
1. Safety
MCF
8. NGL gas equivalent produced
138,725
2. Lease Use
MCF
9. Purchased gas
o
3. Conserv. Purposes
MCF
10. Transferred from:
o
Commissioner
Date
11. Transferred to:
o
I hereby cert~ that t
Signature: (J.O
Form 10-422 (Revised 4/95)
is true and correct to the best of my knowledge.
Title: ¥\A..(,!L. "t'1'o-'::x Date:
I { I~l Q'f
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
Remarks:
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-03
DATE
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
12/7/2003
1412-1434
84
STV//P Compressor shut down unexpectedly
Unplanned Restarted compressor 1801
Total Flare <= 1 Hour 84
Total Flare> 1 Hour 0
Volume Flared 84
Measured Safety Pilot 6,956
Continuous Assist 66,170
TOTAL FLARED 73,210
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-03
DATE
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
12/07/03
1412-1434
74
STV//P Corn pressor shut down unexpectedly
Unplanned Restarted compressor 1801
Total Flare <= 1 Hour 74
Total Flare> 1 Hour 0
Volume Flared 74
Measured Safety Pilot 6,649
Continuous Assist 63,087
TOTAL FLARED 69,810
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-03
DATE
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
12/07/03
1412-1434
o
STV//P Compressor shut down unexpectedly
Unplanned Restarted compressor 1801
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-03
DATE
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
12/07/03
1412-1434
o
STV/IP Compressor shut down unexpectedly
Unplanned Restarted compressor 1801
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
..
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-03
DATE
TIME
VOLUME
(Mscf> DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
12/07/03
1412-1434
2
STV/IP Compressor shut down unexpectedly
Unplanned Restarted compressor 1801
Total Flare <= 1 Hour 2
Total Flare> 1 Hour 0
Volume Flared 2
Measured Safety Pilot 265
Continuous Assist 2,516
TOTAL FLARED 2,783
..
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-03
DATE
TIME
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
12/07/03
1412-1434
2
STV/IP Compressor shut down unexpectedly
Unplanned Restarted compressor 1801
Total Flare <= 1 Hour 2
Total Flare> 1 Hour 0
Volume Flared 2
Measured Safety Pilot 120
Continuous Assist 1,147
TOTAL FLARED 1,269