Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutEndicott Eider / BP Exploration
STATE OF ALASKA OIL & GAS
CONSERVATION COMMISSION
FIELD & POOL: ENDICOTT, EIDER OIL
PRODUCTION FILES
YEAR: 2003
OPERATOR: BP Exploration
Run Date:
Run Time:
PA:
OA:
02/06/2003
10:10:03
EIDR
END
BP Exploration (Alaska) Inc.
Oil Movement Accounting & Reporting
Alaska Oil and Gas Conservation Commission Oil Reconciliation Report
From Date:
To Date:
01/01/2003
01/31/2003
Description
Pipeline Deliveries END
TOTAL PIPELINE DELIVERIES
NGL Deliveries
END/NONE
TOTAL NGL & TIK RECEIVED
Allocation of SLP to END/EPA
Allocation of SLP to END/SDN
FIELD PRODUCTION TOTAUEIDR
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed: Q O. ~~iL TOle: (VIGil TA>-:
Oil Volume
845,710
845,710
-103,916
-103,916
-686,730
-21,637
33,427
Date:
Page 1
Report # SUMDUD - 05
t../Ii 103
Run Date: 02/06/2003
Run Time: 10:06:57
BP Exploration (Alaska) Inc.
Well API T Field M
Name Number Y & E
50- P Pool T
E Code H
2-30A/E102 0292222801 1 220165 1
State of Alaska
Alaska Oil and Gas Conservation Commission
Monthly Production Report
Days
In
Oper.
220165 Ivishak Undefined (Eider) Pool Production Totals..........................
31
Form 10-405
20 AAC 25.230
Endicott Operating Area
Daily Average Production
Tubing Oil Water Gas
PSIG BBL BBL MCF
355
1,078
10,713
2,841
Page 5
January, 2003
Total Monthly Production
Oil Water Gas
BBL BBL MCF
33,427
88,076
33,427
88,076
332,114
332,114
Run Date: 02/06/2003
Run Time: 10:09:45
BP Exploration (Alaska) Inc.
Well API T Field M Days
Name Number Y & E In
50- P Pool T Oper.
E Code H
2-56A/E101 0292286301 4 220165 6 31
220165 Pool Injection Totals......................
END Gathering Center Totals..........................................
Field Injection Total................................................................................
Form 10-406
State of Alaska
Alaska Oil and Gas Conservation Commission
Monthly Injection Report
20 AAC 25.432
Endicott Operating Area Eider
Tubing Pressure Casing Pressure
Max Average Max Average
PSIG PSIG PSIG PSIG
Daily Average Injection
Liquid Gas
BBL MCF
Page 1
January, 2003
Total Monthly Injection
Liquid Gas
BBL MCF
2,644.00 2,408.90 0.00 0.00 3,704 0 114,826 0
114,826 0
114,826 0
114,826 0
Run Date:
Run Time:
PA:
OA:
Signed:
03/10/2003
14:43:25
EIDR
END
Report # SUMDUD - 05 .
BP Exploration (Alaska) Inc.
Oil Movement Accounting & Reporting
Alaska Oil and Gas Conservation Commission Oil Reconciliation Report
From Date:
To Date:
02/01/2003
02/28/2003
I hereby certify that the foregoing is true and correct to the best of my knowledge.
(2 Q. LA~
Description
Pipeline Deliveries END
TOTAL PIPELINE DELIVERIES
NGL Deliveries
END/NONE
TOTAL NGL & TIK RECEIVED
Allocation of SLP to END/EPA
Allocation of SLP to END/SDN
FIELD PRODUCTION TOTAUEIDR
Title:
fl1 ~ Q. TAX
Page 1
Oil Volume
751,758
751,758
-93,346
-93,346
-620,428
-8,471
29,513
Date:
.3/1"7. /0 3
Run Date: 03/10/2003
Run Time: 13:59:58
BP Exploration (Alaska) Inc.
Well API T Field M
Name Number y & E
50- P Pool T
E Code H
2-30A/E102 0292222801 1 220165 1
State of Alaska
Alaska Oil and Gas Conservation Commission
Monthly Production Report
Days
In
Oper.
220165 Ivishak Undefined (Eider) Pool Production Totals..........................
28
Form 10-405
20 AAC 25.230
Endicott Operating Area
Daily Average Production
Tubing Oil Water Gas
PSIG BBL BBL MCF
347
1,054
10,973
2,702
Page 5
February, 2003
Total Monthly Production
Oil Water Gas
BBL BBL MCF
29,513
75,642
29,513
75,642
307,251
307,251
Run Date: 03/10/2003
Run Time: 14:30:32
BP Exploration (Alaska) Inc.
Well A'" T Field M Days
1"'1
Name Number Y & E In
50- P Pool T Oper.
E Code H
2-56A/E101 0292286301 4 220165 6 28
220165 Pool Injection Totals......................
END Gathering Center Totals..........................................
Field Injection Total.......................................................... ......................
Form 10-406
State of Alaska
Alaska Oil and Gas Conservation Commission
Monthly Injection Report
20 AAC 25.432
Endicott Operating Area Eider
Tubing Pressure Casing Pressure
Max Average Max Average
PSIG PSIG PSIG PSIG
Page 1
February, 2003
Total Monthly Injection
Liquid Gas
BBL MCF
Daily Average Injection
Liquid Gas
BBL MCF
2,598.00 2,074.90 0.00 0.00 2,502 0 70,080 0
70,080 0
70,080 0
70,080 0
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
MONTHLY PRODUCTION REPORT
20 AAC 25.230
BP EXPLORATION (ALASKA), INC. EIDER PRODUCTION FACILITY GAS LIQUIDS Feb 2003
Name of Operator Field and Pool Month and Year of Production
1. WEll 2. API NUMBER 3. 4. FIELD 5. 6. DAYS 7. TUBING DAilY AVERAGE PRODUCTION TOTAL MONTHLY PRODUCTION
NO. 50- T & POOL MET~ IN PSIG 8. Oil I 9. WATER 10. GAS 11. Oil 12. WATER 13. GAS
Y CODE OPER (BPD) (BPD) (MCF) (BBl) (BBl) (MCF)
No NGLs from Eider this month or in the future per the Duck Island Unit Ballot Agreement 98-55.
I hereby certify that the foregoing is true and correct to the best of my knowledge 14.
Siç¡ned: O. O. /...A .I A I~.
(
Title: Manaaer, State Taxes & Rovaltv Date: .~ 111.-/0:> TOTAL 0 0 0
Form 10-405 REV 7-29-99
Submit in Duplicate
Run Date:
Run Time:
PA:
OA:
04/04/2003
12:38:29
EIDR
END
BP Exploration (Alaska) Inc.
Oil Movement Accounting & Reporting
Alaska Oil and Gas Conservation Commission Oil Reconciliation Report
From Date:
To Date:
03/01/2003
03/31/2003
Oil Volume
911,126
911,126
-104,999
-104,999
-767,860
-10,959
27,308
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed: Q O. L.-yr-1.M Title: fhGIL 1&
Description
Pipeline Deliveries END
TOTAL PIPELINE DELIVERIES
NGL Deliveries
END/NONE
TOTAL NGL & TIK RECEIVED
Allocation of SLP to ENDIEPA
Allocation of SLP to END/SDN
FIELD PRODUCTION TOTAUEIDR
Page 1
Date:
Report # SUMDUD - 05
'-(IR/os
Run Date: 04/04/2003
Run Time: 12:35:43
State of Alaska
Alaska Oil and Gas Conservation Commission
Monthly Production Report
BP Exploration (Alaska) Inc.
Well API T Field M Days
Name Number Y & E In
50- P Pool T Oper.
E Code H
2-30A/E102 0292222801 1 220165 1 31
220165 Ivishak Undefined (Eider) Pool Production Totals..........................
Form 10-405
20 AAC 25.230
Endicott Operating Area
Daily Average Production
Tubing Oil Water Gas
PSIG BBL BBL MCF
346
881
2,430
10,538
Page 5
March, 2003
Total Monthly Production
Oil Water Gas
BBL BBL MCF
27,308
75,342
326,690
27,308
75,342
326,690
Run Date: 04/04/2003
Run Time: 12:38:15
BP Exploration (Alaska) Inc.
Well API T Field M Days
Name Number y & E In
50- P Pool T Oper.
E Code H
2-56A1EI01 0292286301 4 220165 6 31
220165 Pool Injection Totals......................
END Gathering Center Totals..........................................
Field Injection Total................................................................................
Form 10-406
State of Alaska
Alaska Oil and Gas Conservation Commission
Monthly Injection Report
20 AAC 25.432
Endicott Operating Area Eider
Tubing Pressure Casing Pressure
Max Average Max Average
PSIG PSIG PSIG PSIG
Daily Average Injection
Liquid Gas
BBL MCF
Page 1
March,2003
Total Monthly Injection
Liquid Gas
BBL MCF
1,862.00 1,779.40 0.00 0.00 2,147 0 66,577 0
66,577 0
66,577 0
66,577 0
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
MONTHLY PRODUCTION REPORT
20 AAC 25.230
BP EXPLORATION (ALASKA), INC. EIDER PRODUCTION FACILITY GAS LIQUIDS Mar 2003
Name of Operator Field and Pool Month and Year of Production
1. WELL 2. API NUMBER 3. 4. FIELD 5. 6.DAYS 7. TUBING DAILY AVERAGE PRODUCTION TOTAL MONTHLY PRODUCTION
NO. 50- T & POOL MET~ IN PSIG 8. OIL I 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS
Y CODE OPER (BPD) (BPD) (MCF) (BBL) (BBL) (MCF)
No NGLs from Eider this month or in the future per the Duck Island Unit Ballot Agreement 98-55.
I hereby certify that the foregoing is true and correct to the best of my knowledge 14.
Siç¡ned: (2. Q ~ ~ . 11J.
J
Title: Manaqer. State Taxes & Rovaltv Date: '-{ (c,.¡f 03 TOTAL 0 0 0
Form 10-405 REV 7-29-99
Submit in Duplicate
I hereby certify that the foregoing is true and correct to the best of my knowledge.
t20 L;L
Run Date:
Run Time:
PA:
OA:
Signed:
05/06/2003
15:52:06
EIDR
END
BP Exploration (Alaska) Inc.
Oil Movement Accounting & Reporting
Alaska Oil and Gas Conservation Commission Oil Reconciliation Report
From Date:
To Date:
04/01/2003
04í30/2003
Description
Pipeline Deliveries END
Oil Volume
TOTAL PIPELINE DELIVERIES
956,732
956,732
NGL Deliveries
END/NONE
-106,750
TOTAL NGL & TIK RECEIVED
-106,750
Allocation of SLP to END/EPA
-819,139
Allocation of SLP to END/SDN
-7,234
FIELD PRODUCTION TOTAUEIDR
23,609
Title:
rnGfl ,~.><
Date:
Page 1
Report # SUMDUD - 05
0iel/)3
Run Date: 05/06/2003
Run Time: 15:49:26
State of Alaska
Alaska Oil and Gas Conservation Commission
Monthly Production Report
20 AAC 25.230
BP Exploration (Alaska) Inc. Endicott Operating Area
Daily Average Production
Well API T Field M Days Tubing Oil Water Gas
Name Number Y & E In PslG BBL BBL MCF
50- P Pool T Oper.
E Code H
2-30A/E102 0292222801 1 220165 1 30 339 787 2,430 10,787
220165 Ivishak Undefined (Eider) Pool Production Totals..........................
Form 10-405
Page 5
April, 2003
Total Monthly Production
Oil Water Gas
BBL BBL MCF
23,609
72,897
323,623
23,609
72,897
323,623
Run Date: 05/06/2003
Run Time: 15:51:52
BP Exploration (Alaska) Inc.
Well API T Field M Days
Name Number Y & E In
50- P Pool T Oper.
E Code H
2-56A/E101 0292286301 4 220165 6 30
220165 Pool Injection Totals......................
END Gathering Center Totals..........................................
Field Injection Total................................................................................
Form 10-406
State of Alaska
Alaska Oil and Gas Conservation CommisSion
Monthly Injection Report
20 AAC 25.432
Endicott Operating Area Eider
Tubing Pressure Casing Pressure
Max Average Max Average
PslG PslG PslG PslG
Page 1
April, 2003
Total Monthly Injection
Liquid Gas
BBL MCF
Daily Average Injection
Liquid Gas
BBL MCF
2,476.00 2,098.40 0.00 0.00 3,489 0 104,683 0
104,683 0
104,683 0
104,683 0
Run Date:
Run Time:
PA:
OA:
06/05/2003
08:32:33
EIDR
END
BP Exploration (Alaska) Inc.
Oil Movement Accounting & Reporting
Alaska Oil and Gas Conservation Commission Oil Reconciliation Report
From Date: 05/01/2003
To Date: 05/31/2003
Description
Pipeline Deliveries END
Oil Volume
966,753
TOTAL PIPELINE DELIVERIES
966,753
NGL Deliveries
END/NONE
-109,052
TOTAL NGL & TIK RECEIVED
-109,052
Allocation of SLP to END/EPA
-827,879
Allocation of SLP to END/SDN
-4,579
FIELD PRODUCTION TOTAUEIDR
25,243
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed: Q.O. Á A...~ Title: I1'!brL-rAX
Page 1
Date:
(P/IC/Ò~
Report # SUM DUD - 05
Run Date: 06/05/2003
Run Time: 08:30:33
State of Alaska
Alaska Oil and Gas Conservation Commission
Monthly Production Report
BP Exploration (Alaska) Inc.
Well API T Field M Days
Name Number Y & E In
50- P Pool T Oper.
E Code H
2-30A/E102 0292222801 1 220165 1 30
20 AAC 25.230
Endicott Operating Area
Daily Average Production
Tubing Oil Water Gas
PslG BBL BBL MCF
Page 5
May, 2003
Total Monthly Production
Oil Water Gas
BBL BBL MCF
220165 Ivishak Undefined (Eider) Pool Production Totals..........................
Form 10-405
324
841
2,421
9,423
25,243
72,615
282,694
25,243
72,615
282,694
Run Date: 06/05/2003
Run Time: 08:32:23
BP Exploration (Alaska) Inc.
Well API T Field M Days
Name Number Y & E In
50- P Pool T Oper.
E Code H
2-56A/E101 0292286301 4 220165 6 31
220165 Pool Injection Totals......................
END Gathering Center Totals..........................................
Field Injection Total................................................................................
Form 10-406
State of Alaska
Alaska Oil and Gas Conservation Commission
Monthly Injection Report
20 AAC 25.432
Endicott Operating Area Eider
Tubing Pressure Casing Pressure
Max Average Max Average
PslG PslG PslG PslG
Daily Average Injection
Liquid Gas
BBL MCF
Page 1
May, 2003
Total Monthly Injection
Liquid Gas
BBL MCF
2,559.00 2,407.50 0.00 0.00 4,287 0 132,908 0
132,908 0
132,908 0
132,908 0
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Q.O L.~~
Run Date:
Run Time:
PA:
OA:
Signed:
07/10/2003
09:54:06
EIDR
END
BP Exploration (Alaska) Inc.
Oil Movement Accounting & Reporting
Alaska Oil and Gas Conservation Commission Oil Reconciliation Report
From Date:
To Date:
06/01/2003
06/30/2003
Description
Pipeline Deliveries END
Oil Volume
933,175
933,175
TOTAL PIPELINE DELIVERIES
NGL Deliveries
END/NONE
-105,620
TOTAL NGL & TIK RECEIVED
-105,620
Allocation of SLP to ENDIEPA
-804,055
Allocation of SLP to END/SDN
-4,900
FIELD PRODUCTION TOTAUEIDR
18,600
Title:
Y1Ilú Q. 1" p..;:x
Date:
Page 1
1{'O(03
Report # SUMDUD - 05
Run Date: 07/10/2003
Run Time: 09:52:55
State of Alaska
Alaska Oil and Gas Conservation Commission
Monthly Production Report
20 AAC 25.230
BP Exploration (Alaska) Inc. Endicott Operating Area
Daily Average Production
Well API T Field M Days Tubing Oil Water Gas
Name Number Y & E In PslG BBL BBL MCF
50- P Pool T Oper.
E Code H
2-30A/E102 0292222801 1 220165 1 30 313 620 2,980 7,727
220165 Ivishak Undefined (Eider) Pool Production Totals..........................
Form 10-405
Page 5
June,2003
Total Monthly Production
Oil Water Gas
BBL BBL MCF
18,600
89,413
231,806
18,600
89,413
231,806
Run Date: 07/10/2003
Run Time: 09:53:51
BP Exploration (Alaska) Inc.
Well API T Field M Days
Name Number Y & E In
so- P Pool T Oper.
E Code H
2-56A/E101 0292286301 4 220165 6 30
220165 Pool Injection Totals......................
END Gathering Center Totals..........................................
Field Injection Total.. ........ ........ ............ ..................... ......... .... ................
Form 10-406
State of Alaska
Alaska Oil and Gas Conservation Commission
Monthly Injection Report
20 AAC 25.432
Endicott Operating Area Eider
Tubing Pressure Casing Pressure
Max Average Max Average
PslG PslG PslG PslG
Page 1
June, 2003
Total Monthly Injection
Liquid Gas
BBL MCF
Daily Average Injection
Liquid Gas
BBL MCF
2,565.00 2,521.00 0.00 0.00 4,649 0 139,490 0
139,490 0
139,490 0
139,490 0
BP EXPLORATION (ALASKA), INC. EIDER PRODUCTION FACILITY GAS LIQUIDS Jun 2003
Name of Operator Field and Pool Month and Year of Production
1. WELL 2. API NUMBER 3. 4. FIELD 5. 6.DAYS 7. TUBING DAILY AVERAGE PRODUCTION TOTAL MONTHLY PRODUCTION
NO. 50- T & POOL MET~ IN PSIG 8. OIL I 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS
Y CODE OPER (BPD) (BPD) (MCF) (BBL) (BBL) (MCF)
No NGLs from Eider this month or in the future per the Duck Island Unit Ballot Agreement 98-55.
I hereby certify that the ~egOing is trÕ and correct to the best of my knowledge 14.
Sianed: f2 Q, A - ~A '/,
T
Title: Manaaer, State Taxes & Rovaltv Date: TOTAL 0 0 0
Form 10-405 REV 7-29-99
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
MONTHLY PRODUCTION REPORT
20 AAC 25.230
Submit in Duplicate
Run Date:
Run Time:
PA:
OA:
Signed:
08/08/2003
13:28:45
EIDR
END
BP Exploration (Alaska) Inc.
Oil Movement Accounting & Reporting
Alaska Oil and Gas Conservation Commission Oil Reconciliation Report
From Date:
To Date:
07/01/2003
07/31/2003
I hereby certify that the foregoing is true and correct to the best of my knowledge.
O,a ~1~
Description
Pipeline Deliveries END
TOTAL PIPELINE DELIVERIES
NGL Deliveries
END/NONE
TOTAL NGL & TIK RECEIVED
Allocation of SLP to END/EPA
Allocation of SLP to END/SDN
FIELD PRODUCTION TOTAUEIDR
Title:
YVJbIL ~
Page 1
Oil Volume
858,764
858,764
-78,284
-78,284
-759,149
-140
21,191
Date:
Report # SUMDUD - 05
f)J¡ siD')
Run Date: 08/08/2003
Run Time: 13:26: 16
State of Alaska
Alaska Oil and Gas Conservation Commission
Monthly Production Report
BP Exploration (Alaska) Inc.
Well API T Field M Days
Name Number Y & E In
50- P Pool T Oper.
E Code H
2-30A/E102 0292222801 1 220165 1 31
20 AAC 25.230
Endicott Operating Area
Daily Average Production
Tubing Oil Water Gas
PslG BBL BBL MCF
Page 5
July, 2003
Total Monthly Production
Oil Water Gas
BBL BBL MCF
220165 Ivishak Undefined (Eider) Pool Production Totals..........................
Form 10-405
305
684
2,944
8,366
21,191
91,267
259,347
21,191
91,267
259,347
Run Date: 08/08/2003
Run Time: 13:28:32
BP Exploration (Alaska) Inc.
Well API T Field M Days
Name Number Y & E In
50- P Pool T Oper.
E Code H
2-56A/E101 0292286301 4 220165 6 31
220165 Pool Injection Totals......................
END Gathering Center Totals..........................................
Field Injection Total................................................................................
Form 10-406
State of Alaska
Alaska Oil and Gas Conservation Commission
Monthly Injection Report
20 AAC 25.432
Endicott Operating Area Eider
Tubing Pressure Casing Pressure
Max Average Max Average
PslG PslG PslG PslG
Page 1
July, 2003
Total Monthly Injection
Liquid Gas
BBL MCF
Daily Average Injection
Liquid Gas
BBL MCF
2,483.00 2,400.70 0.00 0.00 4,353 0 134,973 0
134,973 0
134,973 0
134,973 0
BP EXPLORATION (ALASKA), INC. EIDER PRODUCTION FACILITY GAS LIQUIDS Jul2003
Name of Operator Field and Pool Month and Year of Production
1. WELL 2. API NUMBER 3. 4. FIELD 5. 6. DAYS 7. TUBING DAILY AVERAGE PRODUCTION TOTAL MONTHLY PRODUCTION
NO. 50- T & POOL MEn IN PSIG 8. OIL I 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS
Y CODE OPER (BPD) (BPD) (MCF) (BBL) (BBL) (MCF)
No NGLs from Eider this month or in the future per the Duck Island Unit Ballot Agreement 98-55.
I hereby certify that the foregoing is true and correct to the best of my knowledge 14.
Sioned: D. (lJ. Æ A.. PI
Title: Manaqer, State Taxes & Rovaltv Date: bl '5/0') TOTAL 0 0 0
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
MONTHLY PRODUCTION REPORT
20 AAC 25.230
Form 10-405 REV 7-29-99
Submit in Duplicate
Run Date:
Run Time:
PA:
OA:
09/08/2003
15:24:18
EIDR
END
BP Exploration (Alaska) Inc.
Oil Movement Accounting & Reporting
Alaska Oil and Gas Conservation Commission Oil Reconciliation Report
From Date:
To Date:
08/01/2003
08/31/2003
Description
Pipeline Deliveries END
Oil Volume
921,847
TOTAL PIPELINE DELIVERIES
921,847
NGL Deliveries
END/NONE
-96,935
TOTAL NGL & TIK RECEIVED
-96,935
Allocation of SLP to ENDIEPA
-807,509
Allocation of SLP to END/SDN
o
FIELD PRODUCTION TOTAUEIDR
17,403
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed: Q o. ~ A ~ Title: h'1. '" Q. TI'<")(
Page 1
Date:
'/(~l()3
Report # SUMDUD - 05
Run Date: 09/08/2003
Run Time: 15:09:50
State of Alaska
Alaska Oil and Gas Conservation Commission
Monthly Production Report
20 AAC 25.230
BP Exploration (Alaska) Inc. Endicott Operating Area
Daily Average Production
Well API T Field M Days Tubing Oil Water Gas
Name Number Y & E In PslG BBL BBL MCF
50- P Pool T Oper.
E Code H
2-30A/E102 0292222801 1 220165 1 31 321 561 3,140 9,472
220165 Ivishak Undefined (Eider) Pool Production Tötals..........................
Form 10-405
Page 5
August, 2003
Total Monthly Production
Oil Water Gas
BBL BBL MCF
17,403
97,329
293,643
17,403
97,329
293,643
Run Date: 09/08/2003
Run Time: 15:24:10
BP Exploration (Alaska) Inc.
Well API T Field M Days
Name Number y & E In
50- P Pool T Oper.
E Code H
2-56A/E101 0292286301 4 220165 6 31
220165 Pool Injection Totals......................
END Gathering Center Totals..........................................
Field Injection Total................................................................................
Form 10-406
State of Alaska
Alaska Oil and Gas Conservation Commission
Monthly Injection Report
, , .
20 AAC 25.432
Endicott Operating Area Eider
Tubing Pressure Casing Pressure
Max Average Max Average
PslG PslG PslG PslG
Page 1
August, 2003
Total Monthly Injection
Liquid Gas
BBL MCF
Daily Average Injection
Liquid Gas
BBL MCF
2,469.00 2,411.40 0.00 0.00 4,463 0 138,361 0
138,361 0
138,361 0
138,361 0
BP EXPLORATION (ALASKA), INC. EIDER PRODUCTION FACILITY GAS LIQUIDS Aua 2003
Name of Operator Field and Pool Month and Year of Production
1. WELL 2. API NUMBER 3. 4. FIELD 5. 6. DAYS 7. TUBING DAILY AVERAGE PRODUCTION TOTAL MONTHLY PRODUCTION
NO. 50- T & POOL MET~ IN PSIG 8. OIL I 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS
Y CODE OPER (BPD) (BPD) (MCF) (BBL) (BBL) (MCF)
No NGLs from Eider this month or in the future per the Duck Island Unit Ballot Agreement 98-55.
I hereby certify that the foregoing is true and correct to the best of my knowledge 14.
Sianed: 0 n. Á 1 A -Aß il.
(
Title: Manaaer, State Taxes & Rovaltv Date: q {tv/03 TOTAL 0 0 0
Form 10-405 REV 7-29-99
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
MONTHLY PRODUCTION REPORT
20 AAC 25.230
Submit in Duplicate
Run Date:
Run Time:
PA:
OA:
10/06/2003
12:38:24
EIDR
END
BP Exploration (Alaska) Inc.
Oil Movement Accounting & Reporting
Alaska Oil and Gas Conservation Commission Oil Reconciliation Report
Description
Pipeline Deliveries END
From Date: 09/01/2003
To Date: 09/30/2003
Oil Volume
820,911
TOTAL PIPELINE DELIVERIES
NGL Deliveries
TOTAL NGL & TIK RECEIVED
Allocation of SLP to ENDIEPA
Allocation of SLP to END/SDN
820,911
END/NONE
-87,010
-87,010
-715,369
-5,503
FIELD PRODUCTION TOTAUEIDR
13,029
Title:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed: Q O~l) A ~--« J
V
VV\-~ft
ífö<
Date:
Page 1
Report # SUMDUD - 05
ID/~/o3
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
MONTHLY PRODUCTION REPORT
20 AAC 25.230
BP EXPLORATION (ALASKA), INC. EIDER PRODUCTION FACILITY GAS LIQUIDS Sep 2003
Name of Operator Field and Pool Month and Year of Production
1. WELL 2. API NUMBER 3. 4. FIELD 5. 6. DAYS 7. TUBING DAILY AVERAGE PRODUCTION TOTAL MONTHLY PRODUCTION
NO. 50- T & POOL METI- IN PSIG 8. OIL I 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS
Y CODE OPER (BPD) (BPD) (MCF) (BBL) (BBL) (MCF)
No NGLs from Eider this month or in the future per the Duck Island Unit Ballot Agreement 98-55.
I hereby certify that the foregoing is true and correct to the best of my knowledge 14.
Signed: r<~ o. ~ J ",L} ~ J
- I
Title: Manaaer, State Taxes & Rovaltv Date: to (c¡Jo ') TOTAL 0 0 0
Form 10-405 REV 7-29-99
Submit in Duplicate
Run Date: 10/06/2003
Run Time: 12:37:20
0lét(tI ul Alét::;l\ét
Alaska Oil and Gas Conservation Commission
Monthly Production Report
20 AAC 25.230
BP Exploration (Alaska) Inc. Endicott Operating Area
Daily Average Production
Well API T Field M Days Tubing Oil Water Gas
Name Number Y & E In PslG BBL BBL MCF
50- P Pool T Oper.
E Code H
2-30A/E102 0292222801 1 220165 1 26 322 501 3,076 9,748
220165 Ivishak Undefined (Eider) Pool Production Totals..........................
Form 10-405
Page 5
September, 2003
Total Monthly Production
Oil Water
BBL BBL
13,029
79,977
13,029
79,977
Gas
MCF
253,436
253,436
Run Date: 10/06/2003
Run Time: 12:38: 15
BP Exploration (Alaska) Inc.
Well API T Field M Days
Name Number Y & E In
50- P Pool T Oper.
E Code H
2-56A/E101 0292286301 4 220165 6 28
220165 Pool Injection Totals......................
State of Alaska
Alaska Oil and Gas Conservation Commission
Monthly Injection Report
20 AAC 25.432
Endicott Operating Area Eider
Tubing Pressure Casing Pressure
Max Average Max Average
PslG PSIG PslG PslG
Daily Average Injection
Liquid Gas
BBL MCF
Page 1
September, 2003
Total Monthly Injection
Liquid Gas
BBL MCF
END Gathering Center Totals..........................................
Field Injection Total................................................................................
Form 10-406
2,478.00 2,409.50 0.00 0.00 4,313 0 120,790 0
120,790 0
120,790 0
120,790 0
Run Date:
Run Time:
PA:
OA:
11/07/2003
08:14:25
EIDR
END
BP Exploration (Alaska) Inc.
Oil Movement Accounting & Reporting
Alaska Oil and Gas Conservation Commission Oil Reconciliation Report
From Date: 10/01/2003
To Date: 10/31/2003
Description
Pipeline Deliveries END
Oil Volume
906,935
906,935
TOTAL PIPELINE DELIVERIES
NGL Deliveries
END/NONE
-103,954
TOTAL NGL & TIK RECEIVED
-103,954
Allocation of SLP to END/EPA
-787,219
Allocation of SLP to END/SDN
-14,451
Load Diesel
END/EIDR
-4
FIELD PRODUCTION TOTAUEIDR
1,307
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed: Q. Q. ~A~~ Title: lnúíl. :TI:'<"
Page 1
Date:
Ie {JotO}
Report # SUMDUD - 05
Run Date: 11/07/2003
Run Time: 08:13:14
State of Alaska
Alaska Oil and Gas Conservation Commission
Monthly Production Report
20 AAC 25.230
BP Exploration (Alaska) Inc. Endicott Operating Area
Daily Average Production
Well API T Field M Days Tubing Oil Water Gas
Name Number Y & E In PslG BBL BBL MCF
50- P Pool T Oper.
E Code H
2-30A/E102 0292222801 1 220165 2 23 288 57 1,874 986
220165 Ivishak Undefined (Eider) Pool Production Totals..........................
Form 10-405
Page 5
October, 2003
Total Monthly Production
Oil Water Gas
BBL BBL MCF
1,307
43,104
1,307
43,104
22,684
22,684
Run Date: 11/07/2003
Run Time: 08:14:18
BP Exploration (Alaska) Inc.
Well API T Field M Days
Name Number Y & E In
50- P Pool T Oper.
E Code H
2-56A/E101 0292286301 4 220165 6 31
220165 Pool Injection Totals......................
END Gathering Center Totals..........................................
Field Injection Total................................................................................
Form 10-406
State of Alaska
Alaska Oil and Gas Conservation Commission
Monthly Injection Report
20 AAC 25.432
Endicott Operating Area Eider
Tubing Pressure Casing Pressure
Max Average Max Average
PslG PslG PslG PslG
Daily Average Injection
Liquid Gas
BBL MCF
.
Page 1
October, 2003
Total Monthly Injection
Liquid Gas
BBL MCF
2,535.00 2,433.90 0.00 0.00 4,468 0 138,521 0
138,521 0
138,521 0
138,521 0
Run Date:
Run Time:
PA:
OA:
12/03/2003
13:15:10
EIDR
END
BP Exploration (Alaska) Inc.
Oil Movement Accounting & Reporting
Alaska Oil and Gas Conservation Commission Oil Reconciliation Report
From Date:
To Date:
11/01/2003
11/30/2003
Oil Volume
874,225
874,225
-98,637
-98,637
-755,239
-8,329
12,020
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed: r2 Q ¥& TOle: /1!1,bll.. íì"CX
Page 1
Description
Pipeline Deliveries END
TOTAL PIPELINE DELIVERIES
NGL Deliveries
END/NONE
TOTAL NGL & TIK RECEIVED
Allocation of SLP to ENDIEPA
Allocation of SLP to END/SDN
FIELD PRODUCTION TOTAUEIDR
Date: It- /'ß! 0>
Report # SUMDUD - 05
Run Date: 12/03/2003
Run Time: 13: 11 :35
':;>1"'1'" VI I-\'Qo>"'"
Alaska Oil and Gas Conservation Commission
Monthly Production Report
BP Exploration (Alaska) Inc.
Well API T Field M Days
Name Number y & E In
50- P Pool T Oper.
E Code H
2·30AlE102 0292222801 1 220165 2 30
220165 Ivishak Undefined (Eider) Pool Production Totals..........................
Form 10-405
20 AAC 25.230
Endicott Operating Area
Daily Average Production
Tubing Oil Water Gas
PslG BBL BBL MCF
308
401
4,106
1,125
Page 5
November, 2003
Total Monthly Production
Oil Water Gas
BBL BBL MCF
12,020
123,181
12,020
123,181
33,752
33,752
Run Date: 12/03/2003
Run Time: 13:14:56
BP Exploration (Alaska) Inc.
Well API T Field M Days
Name Number y & E In
50- P Pool T Oper.
E Code H
2-56A/E101 0292286301 4 220165 6 30
220165 Pool Injection Totals......................
~tate or AlaSKa
Alaska Oil and Gas Conservation Commission
Monthly Injection Report
20 AAC 25.432
Endicott Operating Area Eider
Tubing Pressure Casing Pressure
Max Average Max Average
PslG PslG PslG PslG
Daily Average Injection
Liquid Gas
BBL MCF
P<>n.. 1
. -~- .
November, 2003
Total Monthly Injection
Liquid Gas
BBL MCF
END Gathering Center Totals..........................................
Field Injection T otal......................................................................... .......
Form 10-406
2,554.00 2,521.30 0.00 0.00 4,645 0 139,366 0
139,366 0
'. 139,366 0
139,366 0
BP EXPLORATION (ALASKA), INC. EIDER PRODUCTION FACILITY GAS LIQUIDS Nov 2003
Name of Operator Field and Pool Month and Year of Production
1. WELL 2. API NUMBER 3. 4. FIELD 5. 6.DAYS 7. TUBING DAILY AVERAGE PRODUCTION TOTAL MONTHLY PRODUCTION
NO. 50- T & POOL MEn IN PSIG a.OIL I 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS
Y CODE OPER (BPD) (BPD) (MCF) (BBL) (BBL) (MCF)
No NGLs from Eider this month or in the future per the Duck Island Unit Ballot Agreement 98-55.
I hereby certify that the fo egoing is true and correct to the best of my knowledge 14.
Siqned: Q.G. I .J . ~1I
I
Title: Manaaer. State Taxes & Rovaltv Date: i 1.. J '13/3 TOTAL 0 0 0
Form 10-405 REV 7-29-99
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
MONTHLY PRODUCTION REPORT
20 AAC 25.230
Submit in Duplicate
Run Date: 01/09/2004
Run Time: 08:43:26
PA: EIDR
OA: END
BP Exploration (Alaska) Inc.
Oil Movement Accounting & Reporting
Alaska Oil and Gas Conservation Commission Oil Reconciliation Report
From Date:
To Date:
12/01/2003
12/31/2003
Description
Pipeline Deliveries END
Oil Volume
882,304
TOTAL PIPELINE DELIVERIES
882,304
NGL Deliveries
END/NONE
-101,056
TOTAL NGL & TIK RECEIVED
-101,056
Allocation of SLP to ENDIEPA
-755,923
Allocation of SLP to END/SDN
-5,840
FIELD PRODUCTION TOTAUEIDR
19,485
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed:
O~Q. ~h
Title: V'\1G(L TAY
Date:
Page 1
l ! ,~/oY
Report # SUMDUD - 05
Run Date: 01/08/2004
Run Time: 13:42:01
State of Alaska
Alaska Oil and Gas Conservation Commission
Monthly Production Report
20 AAC 25.230
BP Exploration (Alaska) Inc. Endicott Operating Area
Daily Average Production
Well API T Field M Days Tubing Oil Water Gas
Name Number y & E In PslG BBL BBL MCF
so- P Pool T Oper.
E Code H
2-30AlE102 0292222801 1 220165 2 31 338 629 4,060 4,709
220165 Ivishak Undefined (Eider) Pool Production Totals..........................
Form 10-405
Page 5
December, 2003
Total Monthly Production
Oil Water Gas
BBL BBL MCF
19,485
125,868
19,485
125,868
145,968
145,968
Run Date: 01/09/2004
Run Time: 08:28:54
BP Exploration (Alaska) Inc.
Well API T Field M Days
Name Number V & E In
50- P Pool T Oper.
E Code H
2-56A/E101 0292286301 4 220165 6 29
220165 Pool Injection Totals......................
State of Alaska
Alaska Oil and Gas Conservation Commission
Monthly Injection Report
20 AAC 25.432
Endicott Operating Area Eider
Tubing Pressure Casing Pressure
Max Average Max Average
PslG PslG PSIG PslG
Daily Average Injection
Liquid Gas
BBL MCF
Page 1
December, 2003
Total Monthly Injection
Liquid Gas
BBL MCF
END Gathering Center Totals..........................................
Field Injection T otal....... ......... ........ ... ................................ .......... ...........
Form 10-406
2,604.00 2,492.60 0.00 0.00 2,948 0 85,512 0
85,512 0
85,512 0
85,512 0
BP EXPLORATION (ALASKA), INC. EIDER PRODUCTION FACILITY GAS LIQUIDS Dee 2003
Name of Operator Field and Pool Month and Year of Production
1. WELL 2. API NUMBER 3. 4. FIELD 5. 6. DAYS 7. TUBING DAILY AVERAGE PRODUCTION TOTAL MONTHLY PRODUCTION
NO. 50- T & POOL MET!- IN PSIG 8. OIL I 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS
Y CODE OPER (BPD) (BPD) (MCF) (BBL) (BBL) (MCF)
No NGLs from Eider this month or in the future per the Duck Island Unit Ballot Agreement 98-55.
I hereby certify that the foregoing is true and correct to the best of my knowledge 14.
Sianed: (). (\). Á J AAi 1.A.
I
Title: Manaaer. State Taxes & Rovaltv Date: 1/11../ oy TOTAL 0 0 0
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
MONTHLY PRODUCTION REPORT
20 AAC 25.230
Form 10-405 REV 7-29-99
Submit in Duplicate