FACILITY REPORT OF PRODUCED GAS DISPOSITION
/operator /Field(S)
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU
Month/Year of Disposition
01/2004
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
1. Sold
3. Flared or vented less than 1 hour.
141
Pool Name Code Percent
PRUDHOE 640150 99.75%
PBU Midnight Sun Undefined 640158 0.25%
4,404,112
2. Reinjected
232,446,196
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
o
5. Pilot and Purge
30,789
6. Used for lease operations
Fuel
Assist
7,613,373
o
7. Other
Lift Gas, Off Field
o
TOTAL items 1 - 7
244,494,611
1. Safety
MCF
8. NGL gas equivalent produced
o
2. Lease Use
MCF
9. Purchased gas
o
3. Conserv. Purposes
MCF
10. Transferred from: FS 1, FS2, FS3, GC1, GC2, GC3
263,320,141
Commissioner
Date
11. Transferred to: CGF
21,375,556
Remarks:
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
I hereby ceryty' that tt¡ foregoirw ~s true and correct to the best of my knowledge.
Signature: IL - a. Il ~ Title: SUPERVISOR
Form 10-422 (Revised 4/95)
JÞ
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
January 2004
Page 1
IUnplanned Events less than or equal to 1 hour
1/24/2004
1120-1125
141 Not required for unplanned events which
are less than or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
141
IUnplanned Events greater than 1 hour
See attachments
See attachments
TOTAL
o
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
See attachments
TOTAL
o
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mct
See attachments
See attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
o
o
o
30,930
2/6/2004
10:41 AM
I Facility
CENTRAL COMPRESSOR PLANT
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
loperator IField(S)
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU
I Month/Year of Disposition
02/2004
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
3. Flared or vented less than 1 hour.
o
Pool Name Code Percent
PRUDHOE 640150 99.75%
PBU Midnight Sun Undefined 640158 0.25%
1. Sold
3,355,538
2. Reinjected
223,639,378
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
o
5. Pilot and Purge
31,138
6. Used for lease operations
Fuel
Assist
5,805,121
o
7. Other
Lift Gas, Off Field
o
TOTAL items 1 - 7
232,831 ,175
1. Safety
MCF
8. NGL gas equivalent produced
o
2. Lease Use
MCF
9. Purchased gas
o
3. Conserv. Purposes
MCF
10. Transferred from: FS1, FS2, FS3, GC1, GC2, GC3
250,103,543
Commissioner
Date
11. Transferred to: CGF
20,165,352
Remarks:
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
I hereby cert~ that th! foregoing is true and correct to the best of my knowledge.
Signature: (1,0. I\. ~ Title: SUPERVISOR
Form 10-422 (Revised 4/95)
,
.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
February 2004
Page 1
Events less than or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
o
Events greater than 1 hour
See attachments
See attachments
TOTAL
o
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
See attachments
TOTAL
o
Events Exceeding 1 Hour OR Exceeding 5000 Mct
attachments
See attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
o
o
o
TOTAL FLARED VOLUME
31,138
3/5/2004
2:06 PM
I Facility
CENTRAL COMPRESSOR PLANT
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
operator I Field(s)
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU
I Month/Year of Disposition
03/2004
Disposition
Volume MCF*
'Indicate contribution of each pool to total.
3. Flared or vented less than 1 hour.
411
Pool Name Code Percent
PRUDHOE 640150 99.75%
PBU Midnight Sun Undefined 640158 0.25%
1. Sold
4,271,968
2. Reinjected
237,308,858
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
o
5. Pilot and Purge
33,778
6. Used for lease operations
Fuel
Assist
6,264,920
o
7. Other
Lift Gas, Off Field
o
TOTAL items 1 - 7
247,879,935
1. Safety
MCF
8. NGL gas equivalent produced
o
2. Lease Use
MCF
9. Purchased gas
o
3. Conserv. Purposes
MCF
10. Transferred from: FS1, FS2, FS3, GC1, GC2, GC3
266,487,605
Commissioner
Date
11. Transferred to: CGF
21,669,978
Remarks:
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
I hereby ce~ t~t thr foregoin?js ,true and correct to the best of my knowledge.
Signature: (..¿ ·w. l\. ~ Title: SUPERVISOR
Form 10-422 (Revised 4/95)
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT· CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
March 2004
Page 1
Events less than or equal to 1 hour
2/1 9/2004
1500-1505
135 Not required for unplanned events which
are less than or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
135
IUnplanned Events greater than 1 hour
See attachments
See attachments
TOTAL
o
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
2/6/2004
2/19/2004
1145-1155
0810-0815
135
141
See attachments
TOTAL
276
Events Exceeding 1 Hour OR Exceeding 5000 Mcf
See attachments
See attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
o
276
o
34,189
4/8/2004
3:06 PM
REPORT NO: 04-0076
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP
DATE: 06 Mar 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLU1IIIE
1. Flare/Relief Valve 11 :45 11 :55 0 Hrs 10Mins 0 0 ~ 135 MSCF
TOTAL VOLUME
135 MSCF
First Determination of Cause:
1. TC 1801 shut down for maintenance. Replaced broken springs in fuel gas stop/ratio valves.
Action Taken to Stop Flaring:
1. Completed shutdown.
Tuesday, March 30, 2004
Page 1 of 1
FACILITY: CCP
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
REPORT NO: 04-0088
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 19 Mar 2004
TIME OF FLARING
Start Stop Duration
08:10 08:15 OHrs
15:00 15:05 0 Hrs
First Determination of Cause:
1. Shut-Down T/C1801 for maint.
2. T /C 1801 shut down after startup
Action Taken to Stop Flaring:
1. Gas Train depressured
2. Restarted turbine
Tuesday, March 30, 2004
Black
Intermittent Smoke
5Mins 0 0
5Mins 0 0
Planned
.~.
o
TOTAL VOLUME
VOLUME
J4:LMSCF
135 MSCF
276 MSCF
Page 1 of 1
I Facility
CENTRAL COMPRESSOR PLANT
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
loperator I Field(s)
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU
I Month/Year of Disposition
04/2004
Disposition
Volume MCF'
'Indicate contribution of each pool to total.
1. Sold
3. Flared or vented less than 1 hour.
3,091
Pool Name Code Percent
PRUDHOE 640150 99.75%
PBU Midnight Sun Undefined 640158 0.25%
3,147,781
2. Reinjected
219,353,183
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
o
5. Pilot and Purge
32,650
6. Used for lease operations
Fuel
Assist
6,021,933
o
7. Other
Lift Gas, Off Field
o
TOTAL items 1 - 7
228,558,638
1. Safety
MCF
8. NGL gas equivalent produced
o
2. Lease Use
MCF
9. Purchased gas
o
3. Conserv. Purposes
MCF
10. Transferred from: FS1, FS2, FS3, GC1, GC2, GC3
245,301,240
Commissioner
Date
11. Transferred to: CGF
20,036,123
is true and correct to the best of my knowledge.
Title: SUPERVISOR
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
Remarks:
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
April 2004
Page 1
IUnplanned Events less than or equal to 1 hour
4/14/2004
4/17/2004
4/17/2004
4/27/2004
Not required for unplanned events which
are less than or equal to 1 hour
1638-1643
1235-1238
1822-1825
0905-0910
135 Not required for unplanned events which
8 are less than or equal to 1 hour
45
141
TOTAL
329
IUnplanned Events greater than 1 hour
See attachments
See attachments
TOTAL
o
Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
See attachments
4/14/2004
4/14/2004
4/16/2004
4/17/2004
4/17/2004
4/17/2004
4/17/2004
4/17/2004
4/17/2004
4/17/2004
4/17/2004
4/17/2004
4/17/2004
4/17/2004
4/17/2004
4/18/2004
4/18/2004
4/18/2004
4/18/2004
4/18/2004
4/18/2004
4/18/2004
0030-0035
0350-0355
2325-2328
0140-0145
0225-0235
0410-0413
0525-0530
0800-0805
11 00-11 03
1155-1205
1335-1340
1430-1435
1600-1603
2028-2033
2307-2312
0035-0038
0350-0353
0440-0450
0730-0733
0735-0745
1 000-1 003
2110-2115
135
14
8
135
156
14
35
135
14
156
141
35
8
135
35
14
14
159
32
141
14
32
5/11/2004
1 :27 PM
4/19/2004
4/19/2004
4/19/2004
4/19/2004
4/19/2004
4/20/2004
4/20/2004
4/20/2004
4/20/2004
4/21/2004
4/21/2004
4/21/2004
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT· CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
April 2004
Page 2
0030-0033
0125-0135
0240-0250
0440-0445
2020-2023
0505-0508
0830-0840
1100-1103
2040-2043
0200-021 0
0418-0423
2050-2055
14
156
135
35
8
14
141
14
14
408
152
109
TOTAL
2,762
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
See
See attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour 0
Planned Events < 1 hour and not 2,762
exceeding 5,000 MCF
Planned Events> 1 hour or 0
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME 35,741
5/11/2004
1 :27 PM
REPORT NO: 04-0116
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP
DATE: 14 Apr 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke
1. Flare/Relief Valve 00:30 00:35 0 Hrs 5 Mins 0 0
2. Flare/Relief Valve 03:50 03:55 0 Hrs 5 Mins 0 0
3. Flare/Relief Val'le" 16:38 16:43 ''ß'Hrs''SMins' 0 0
Planned: 'VOLUME
~ .135 MSCF
~ 14 MSCF
o '135MSCF
TOTAL VOLUME.284MSCF
First DeterminationotCause:
1. Planned Shut Down of T /C 1804 for maint. T -shell pull and water wash, PSV work.
2. T/C Spin cool completed, train depressured for maint. and water wash.
3. T /C 1806 Tripped off line, undeterrntnedre-ason'1oT·trip.;'1nst'Te·chs. Looked for p rob1 ems replaced
a speedtronics card.
Action Taken to Stop Flaring:
1. T /C 1804 depressured for spin cool.
2. T/C 1804 depressured, spin cool complete, planned maint. Schedule.
3. T/C 1806 vented down. Unit was restarted.
Sunday, April 25, 2004
Page 1 of 1
FACILITY: CCP
SYSTEM
1. Flare/Relief Valve
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 16 Apr 2004
TIME OF FLARING Black
Start Stop Dur~ttionlntermittent 'Smoke
23:25 23:28 o.Hrs 3Mins ..D 0
REPORT NO: 04-011 9
Planned VOLUME
~ 8 MSCF
TOTAL VOLUME
8 MSCF
First Determination of Cause:
1. T/C Stopped after SpinCooling
Action Taken to Stop Flaring:
1. Restarted T /C
Sunday, April 25, 2004
Page 1 of 1
REPORT NO: 04-0120
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP DATE: 17 Apr 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve ,.01:40 01:45 O.Hrs 5 Mins 0 0 ~ 135 MSCF
2. Flare/Relief Valve 02:25 02:35 OHrs 10 Mins 0 0 ~ 156 MSCF
3. Flare/Relief Valve '04:10 '04:1'3 ····OHT$ 3N1ins 0 0 ~ 14 MSCF
4. Flare/Relief Valve 05:25 05:30 o Hrs 5Mins 0 0 ~ 35 MSCF
5. Flare/Relief Valve 08:00 08:05 o Hrs 5 Mins 0 0 ~ 135 MSCF
6. Flare/Relief Valve 11 :00 11:03 ,. OArs 3Mins ''0 0 ~ 14 MSCF
7. Flare/Relief Valve 11:55 12:05 o Hrs 10 Mins 0 0 ~ 156 MSCF
8. Flare/Relief Valve 12:35 12:38 OHrs 3Mins 0 0 0 8 MSCF
9. Flare/Relief Valve 13:35 13:40" "OHrs' 5Mins 0 0 .~ . 141 MSCF
10. Flare/Relief Valve 14:30 14:35 OHrs 5Mins 0 0 ~ 35 MSCF
11. Flare/Relief Valve 16:00 16:03 OHrs 3Mins 0 0 ~ 8 MSCF
12. Flare/Relief Valve 18:22 18:25 OArs 3Mins 0 0 0 45 MSCF
13. Flare/Relief Valve 20:28 20:33 OHrs 5Mins 0 0 ~ 135 MSCF
14. Flare/Relief Valve 23:07 23:12 o Hrs 5Mins 0 0 ~ 35 MSCF
TOTAL VOLUME . 1,052 MSCF
First Determination of Cause:
1. T /C 1806 Stopped - Planned Shutdown for Maint & W aterW ash
2. T /C 1810 Stopped - Planned Shutdown for Maint & W aterW ash
3. T/C 1806 ESD'd after Spin Cooling
4. T/C ESD'd after SpinCooling
5. T/C 1803 Stopped - Planned Shutdown Maint & WaterWash
6. T/C 1803 ESD'd after SpinCooling
Sunday, April 25, 2004
Page 1 of 3
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP
DATE: 17 Apr 2004
7 j.8": T/C 1811 Stopped - Planned Shutdown for Maint & WaterWash
<6 yr. T/C 1803 Tripped while SpinCooling ?
i :Hf." T/C 1807 ESO'd for Planned Maint & WaterWash
l 0 % T/c 1811 ESO'd after SpinCooling
( [ 98. T/C 1807 Stopped after SpinCooling
12.. 21: T/C 1807 Tripped?
(?7 22. T/C 1813 Stopped - Planned Shutdown for'Maint &Waterwash
I Lf ~. T/C 1811 ESO'd after W aterW ash
Action Taken to Stop Flaring:
1. T/C Oepressured
2. T /C Oepressured
3. T/C Oepressured
4. T /C Oepressured
5. T/C Oepressured
6. T /C Oepressured
7. T/C Oepressured
8. T /C Restarted
9. T/C Oepressured
10. T/C Oepressured
11. T /C Oepressured
12. T/C Oepressured
13. T/C Oepressured
Sunday, April 25, 2004
REPORT NO: 04-0120
Page 2 of 3
REPORT NO: 04-0120
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP DATE: 17 Apr 2004
~ L\- y! T/C Depressured
Sunday, April 25, 2004 Page 3 of 3
REPORT NO: 04-0122
bp
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP DATE: 18 Apr 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 00:35 ...00:38. .. o.Hrs 3.Mins 0 0 ~ 14 .MSCF
2. Flare/Relief Valve 03:50 03:53 o Hrs 3Mins 0 0 ~ 14 MSCF
3. Flare/Relief Valve 04:40 04:50 o Hrs 1 01'íili ns 0 0 ~ '159 MSCf
4. Flare/Relief Valve 07:30 07:33 o Hrs 3Mins 0 0 ~ 32 MSCF
5. Flare/Relief Valve 07:35 07:45 OHrs 10 Mins 0 0 ~ 141 MSCF
6. Flare/Relief Valve 10:00 10:03 o Hrs 3Mins 0 0 ~ 14 MSCF
7. Flare/Relief Valve 21 :10 21:15 o Hrs 5Mins 0 0 ~ 32 MSCF
TOTAL VOLUME 406 MSCF
First Determination of Cause:
1. T/C 1813 ESO'd - Finished Spin Cooling
2. T/C ESO'd - Finished Water Washing
3. T /C 1809 ESO'd - Planned Shutdown for Maint & Water Washing
4. T/C 1809 Stopped - Finished Spin Cooling
5. T/C 1802 ESO'd - Planned Shitdown for Maint & Water Wash
6. T/C 1802 ESO'd - Finished Spin Cooling
7. T/C 1809 Stopped - Finished Water Washing
Action Taken to Stop Flaring:
1. T/C Oepressured
2. T/C Oepressured
3. T/C Oepressured
4. T/C Oepressured
Sunday, April 25, 2004
Page 1 of 2
FACILITY: CCP
ç Æ T /C Oepressured
b % T/C Oepressured
l J%' I'
l(
Sunday, April 25, 2004
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 18 Apr 2004
REPORT NO: 04-0122
Page 2 of 2
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP DATE: 19 Apr 2004
TIME OF FLARING
SYSTEM Start Stop Duration Intermittent
1. Flare/Relief Valve 00:3000;33 .0,,Hrs. . .3.Mins.fl
2. Flare/Relief Valve 0
3. Flare/Relief ValveD
4. Flare/Relief Valve 0
5. Flare/Relief Valve 0
01:25 01:35 OHrs 10 Mins
02:40 02:50 . 'O'Hrs'OMins
04:40 04:45 OBrs 5Mins
20:20 20:23 OHrs 3Mins
First Determination of Cause:
1. T/C 1813 ESD'd - Finished Water Washing
2. T/C 1812 Stopped - Planned Shutdown for Maint & Water Wash
3. T /C 1805 Stopped - Planned Shutdown for Maint & W ater Wash
4. T/C 1812 ESD'd - Finished Spin Cooling
5. T/C 1802 Stopped - Finished Water Wash
Action Taken to Stop Flaring:
1. T /C Depressured
2. T/C Depressured
3. T/C Oepressured
4. T/C Depressured
5. T /C Depressured
Sunday, April 25, 2004
REPORT NO: 04-0128
Black
Smoke Planned VOLUME
0 ~ ".... .14..MSCF
0 ~ 156 MSCF
0 ~ . "'1'35"MSCF
0 ~ 35.MSCF
0 ~ 8 MSCF
TOTAL VOLUME 348 MSCF
Page 1 of 1
REPORT NO: 04-0130
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP DATE: 20 Apr 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 05:05 05:08 OHrs 3Mins 0 0 ~ 14..,MSCF
2. Flare/Relief Valve 08:30 08:40 OHrs 10 Mins 0 0 ~ 141 MSCF
3. Flare/Relief Valve 11:00 11:03 OHrs 3Mins 0 0 ~ '14 "MSCF
4. Flare/Relief Valve 20:40 20:43 OHrs 3Mins 0 0 ~ 14 MSCF
TOTAL VOLUME 183 MSCF
First Determination of Cause:
1. T /C 1805 ESD'd - Finished Water Wash
2. T /C 1808 ESD'd - Planned shutdown for Maiflt '&·WaterWash
3. T/C 1808 ESD'd - Finished Spin Cooling
4. T /C 1808 ESD'd - Finished Water Wash
Action Taken to Stop Flaring:
1. T/C Depressured
2. T/C Depressured
3. T/C Depressured
4. T/C Depressured
Sunday, April 25, 2004
Page 1 of 1
FACILITY: CCP
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
3. Flare/Relief Valve
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 21 Apr 2004
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke
02:00,·,02;1D OHrs,.lO.MinsQQ
04:18 04:23 0 Hrs 5Mins 0 0
20:50' "20:"55 0 Hrs "5'MínsDO
REPORT NO: 04-0131
Planned VOLUME
~ ','" 408¡.,MSCF
~ 152 MSCF
~ ,~ 109 MSCf
TOT:AL VOLUME
First Determination of Cause:
1. T/C 1878 Stopped - Planned shutdown for Maint & Water Wash
2. T/C 1878 ESD'D - Finished Spin Cooling
3. T /C 1878 Stopped after water wash
Action Taken to Stop Flaring:
1. T /C Depressured
2. T /C Depressured
3. T/C 1878 Depressured
Sunday, April 25, 2004
,.669 ,MSCF
Page 1 of 1
~.,
STATE OF ALASKA
ALASKA Oil AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000000
12. Facility Name
PBU CCP/FFGU
Disposition
3. Field
PBU - EOA
Volume MCF
6. Sold
3,395,826
7. Reinjected
218,545,906
8. Flared or vented 1 hour or less
o
9. Flared or vented more than 1 hour (see instr.)
o
10. Pilot and Purge
33,778
11. Used for lease operations (specify in Remarks)
5,990,961
12. Other (see instructions)
°
13. TOTAL VOLUME (ITEMS 6-12)
227,966,471
14. NGL Gas Equivalent
°
15. Purchased gas
°
16. Transferred from: FS1, FS2, FS3, GC1, GC2, GC3
244,079,986
17. Transferred to: (Express as a negative #) CGF
-19,558,997
18. Remarks: Block 11: Fuel Gas = 5,990,961 mscf and Assist Gas = ° mscf
I h~:;::::~'Q. õ~l::;;:ro~' b~' m my ,_,dg'.
14. Operator 15. Month/Year of Disposition
BP May-2004
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
Pool Name
PRUDHOE
PBU Midnight Sun Undefined
Pool Code
Percent
640150
640158
99.75%
0.25%
Authorization MCF
Safety
MCF
Lease Use
MCF
Conservation
Waste: MCF
Commissioner Date
Printed Name
Robert A. Reynolds
Phone (907)564-5028
Title Manager, State Taxes and Royalty
Date eo! 10{ 0'-1
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authoritv 20 AAC25.235.
Form 10-422 Rev. 1/2004
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT· CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
May 2004
Page 1
IUnplanned Events less than or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
o
Events greater than 1 hour
See attachments
See attachments
TOTAL
o
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
See attachments
TOTAL
o
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
See attachments
See attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
o
o
o
TOTAL FLARED VOLUME
33,778
6/4/2004
10:06 AM
.
.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000000
12. Facility Name
PBU CCP/FFGU
Disposition
3. Field
PBU - EOA
Volume MCF
14. Operator 15. Month/Year of Disposition
BP June-2004
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
2,455,565
Pool Name
PRUDHOE
PBU Midnight Sun Undefined
Pool Code
640150
640158
Percent
99.75%
0.25%
7. Reinjected
190,079,946
8. Flared or vented 1 hour or less
1,301
9. Flared or vented more than 1 hour (see instr.)
o
10. Pilot and Purge
32,689
11. Used for lease operations (specify in Remarks)
5,380,005
12. Other (see instructions)
o
Authorization> 1 hr:
Safety
13. TOTAL VOLUME (ITEMS 6-12)
197,949,506
MCF
Lease Use
14. NGL Gas Equivalent
o
Conservation
MCF
15. Purchased gas
o
Waste:
MCF
16. Transferred from: FS1, FS2, FS3, GC1, GC2, GC3
210,944,965
17. Transferred to: (Express as a negative #) CGF
-16,065,847
Commissioner
Date
18. Remarks: Block 11: Fuel Gas = 5,380,005 msef and Assist Gas = 0 msef
I hereby certify that the foregoing is true and correct to the best of my knowledge.
S;gM"m (2,0. fu ~
Printed Name
Robert A. Reynolds
Phone (907)564-5028
Date 7/-z,JoÎ
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authoritv 20 AAC25.235.
Title Manager, State Taxes and Royalty
Form 10-422 Rev. 1/2004
Submit in Duplicate
-
Page 1
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
June 2004
lU~~lanned~v.~~ts les~ tha~orequal to.1~~ur
.. ...... P~TE.··· ... ··.TIME .. ... . .VQLUMIS. ..... P!:i$CF\,pT'º!IIQF INCI[)ENT;!¡C;A!)$E·· .
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
o
···Ä:ç'tlºN!~K:çN¡Tºr;!4!M!~Ä:re;cÄQ$Ç'············
Not required for unplanned events which
are less than or equal to 1 hour
IUnplanned Events greater than 1 hour
. .. . DATE .... .. ..... .... . TIME. . .. .. ·VOLUMEDESCFUPTION OF INCIDENT &.CAUSE >.. .. . ... ..ACTI.ONTAKENTOEUMINATECAUSE··
See attachments See attachments
TOTAL
o
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
·····º~Tr;\ ........... ...... ... . ·TIMi:. ...... V(j),,"UME .. ···I);$(;;i\\If!l"(j)!II·(j)¡FI(\lÇIPl:foIT.\C;A!JSE
6/5/2004 0035-0045 156
6/5/2004 0400-0403 11
6/5/2004 0830-0835 141
6/5/2004 1 055-11 00 14
6/5/2004 1535-1540 141
6/6/2004 1115-1120 141
6/6/2004 1345-1350 14
6/6/2004 1935-1940 159
6/6/2004 2220-2223 35
6/8/2004 2145-2150 91
6/22/2004 2230-2235 135
6/23/2004 1647-1705 263
TOTAL
1,301
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
See attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
o
1,301
o
TOTAL FLARED VOLUME
33,990
. ACTION TAKEN TO ELIMINATE CAUSE.
See attachments
See attachments
7/8/2004
10:00 AM
REPORT NO: 04-0206
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP DATE: 05 Jun 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 00:35 00:45 OHrs 10 Mins 0 0 ~ 156 MSCF
2. Flare/Relief Valve 04:00 04:03 OHrs 3Mins 0 0 ~ 11 MSCF
3. Flare/Relief Valve 08:30 08:35 OHrs 5Mins 0 0 ~ 141 MSCF
4. Flare/Relief Valve 10:55 11:00 OHrs 5Mins 0 0 ~ 14 MSCF
5. Flare/Relief Valve 15:35 15:40 OHrs 5 Mins 0 0 ~ 141 MSCF
TOTAL VOLUME 463 MSCF
First Determination of Cause:
1. Shut down T/C 1811 for maintenance work.
2. T/C 1811 ESD'd after spin cool.
3. T/C 1804 Shut down for maintenance work. ESD Test acomplished.
4. T/C 1804 spin Cooling complete, unit shut down for maintenance.
5. T/C 1802 Shut Down For maintenance repairs and controls systems upgrades. ESD shutdown
tested.
Action Taken to Stop Flaring:
1. T/C depressured
2. T /C depressured
3. T/C train depressured, unit restarted for spin cool.
4. T/C train depressured, for maint.
5. T/C train depressured, for maint. Ratchet cool down.
Friday, June 18, 2004
Page 1 of 1
\
REPORT NO: 04-0210
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP DATE: 06 Jun 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 11 :15 11:20 OHrs 5Mins 0 0 ~ 141 MSCF
2. Flare/Relief Valve 13:45 13:50 OHrs 5 Mins 0 0 ~ 14 MSCF
3. Flare/Relief Valve 19:35 19:40 OHrs 5Mins 0 0 ~ 159 MSCF
4. Flare/Relief Valve 22:20 22:23 OHrs 3Mins 0 0 ~ 35 MSCF
TOTAL VOLUME 349 MSCF
First Determination of Cause:
1. Unloaded and Shut Down T /C 1801 for maint. Repairs, water wash and Functional ESD Switch,
Testing.
2. Spin cooling of T /C1801 complete, unit shut down for maint. Repairs and water wash.
3. T/C 1810 ESD'd for planned maintenance.
4. T/C 1810 ESD'd after spin cool.
Action Taken to Stop Flaring:
1. T /C 1801 depressured for spin cooling.
2. T/C 1801 depressured for maint. Repairs and water wash.
3. T/C 1810 compressor depressured to Opsi
4. T/C 1810 compressor depressured to Opsi.
Friday, June 18, 2004
Page 1 of 1
,
REPORT NO: 04-0216
BPXA FLARE REPORT
PRUDHOE BAY
FACILlTY:CCP
DATE: 08 Jun 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 21 :45 21 :50 0 Hrs 5 Mins 0 0 ~ 91 MSCF
TOTAL VOLUME
91 MSCF
First Determination of Cause:
1. T /C 1810 depressured after pressure test.
Action Taken to Stop Flaring:
1. T/C 1810 depressured
Friday, June 18, 2004
Page 1 of 1
,
REPORT NO: 04-0244
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP
DATE: 22 Jun 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 22:30 22:35 0 Hrs 5 Mins 0 0 ~ 135 MSCF
TOTAL VOLUME
135 MSCF
First Determination of Cause:
1. T /C 1803 shut down for major overhaul and mark VI upgrade
Action Taken to Stop Flaring:
1. compressor vented down to 50 psi
Thursday, July 01, 2004
Page 1 of 1
REPORT NO: 04-0245
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP
DATE: 23 Jun 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 16:47 17:05 OHrs 18Mins 0 0 ~ 263 MSCF
TOTAL VOLUME
263 MSCF
First Determination of Cause:
1. T /C 1803 ESD'd after spin-cool
Action Taken to Stop Flaring:
1. T /C depressured to Opsi
Thursday, July 01, 2004
Page 1 of 1
..
1. Facility Number
0290000000
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION R~v í SEat
12. Facility Name 3. Field 14. Operator 15. MonthNear of Disposition
PBU CCP/FFGU PBU - EOA BP July-2004
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
2,474,795
Pool Name
PRUDHOE
PBU Midnight Sun Undefined
Pool Code
640150
640158
Percent
99.75%
0.25%
7. Reinjected
182,072,429
8. Flared or vented 1 hour or less
2,459
9. Flared or vented more than 1 hour (see instr.)
o
10. Pilot and Purge
33,778
11. Used for lease operations (specify in Remarks)
5,761,318
12. Other (see instructions)
o
Authorization> 1 hr:
Safety
MCF
13. TOTAL VOLUME (ITEMS 6-12)
190,344,779
MCF
Lease Use
14. NGL Gas Equivalent
o
Conservation
MCF
15. Purchased gas
o
Waste:
MCF
16. Transferred from: FS1, FS2, FS3, GC1, GC2, GC3
201,989,195
17. Transferred to: (Express as a negative #) CGF
-14,838,597
Commissioner
Date
18. Remarks: Block II: Fuel Gas = 5,761,318 mscf and Assist Gas = ° mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature~~ -V
Printed Nam: ~o~ert AQeynOldS
Title Manager, State Taxes a;¡ROya¡
Phone (907)564-5028 Date ~ 2-b¡ 0 't
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authoritv 20 AAC25.235.
Form 10-422 Rev. 1/2004
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT· CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
July 2004
IUnplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
7/11/2004 1120-1125 152 Not required for unplanned events which
7/11/2004 1140-1145 152 are less than or equal to 1 hour
7/11/2004 1330-1335 152
7/11/2004 1410-1415 152
7/11/2004 1445-1450 45
7/11/2004 1510-1515 152
7/11/2004 1545-1550 45
7/11/2004 1555-1600 152
7/12/2004 1025-1030 156
TOTAL
1,158
IUnplanned Events greater than 1 hour
DATE TIME VOLUME
DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL
o
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTIONOFINCIDENT&CAUSE
7/1/2004 1205-1207 8 See attachments
7/9/2004 2020-2025 135
7/9/2004 2055-2100 156
7/10/2004 0000-0005 8
7/10/2004 0015-0020 135
7/10/2004 0040-0045 35
7/10/2004 0515-0520 408
7/10/2004 1051-1056 408
7/10/2004 1100-1105 8
TOTAL
1,301
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mct
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
o
1,301
o
TOTAL FLARED VOLUME
36,237
Page 1
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO EUMINATE CAUSE
See attachments
attachments
8/26/2004
10:44 AM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000000
12. Facility Name
PBU CCP/FFGU
Disposition
6. Sold
7. Reinjected
8. Flared or vented 1 hour or less
9. Flared or vented more than 1 hour (see instr.)
10. Pilot and Purge
11. Used for lease operations (specify in Remarks)
12. Other (see instructions)
13. TOTAl VOLUME (ITEMS 6-12)
14. NGL Gas Equivalent
15. Purchased gas
16'Tranet1~;~3M'f'[~! -'1
17. TranUd ~ 3SS a~! 'ititð= ~ I
.1.I;j. -
18. Remarks: Block 11: Fuel Gas = 5,761,318 mscf and Assist Gas = 0 mscf
~ -~~- 2/:X:J'-j
I hereby certify that the foregoing is true and correct to the best of my knowledge.
",,,rure Qü ¥
Printed Name Robert A. Reynolds
Form 10-422 Rev. 1/2004
3. Field
PBU - EOA
Volume MCF
2,474,795
182,070,897
2,459
1,532
33,778
5,761,318
o
190,344,779
o
o
201,989,195
-14,838,597
14. Operator 15. Month/Year of Disposition
BP July-2004
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
Pool Name
PRUDHOE
PBU Midnight Sun Undefined
Pool Code
640150
640158
Percent
99.75%
0.25%
Authorization> 1 hr:
Safety
MCF
Lease Use
Conservation
Waste:
Commissioner
Phone (907)564-5028
Title Manager, State Taxes and Royalty
Date t1/ ~{oy
MCF
MCF
MCF
Date
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authoritv 20 AAC25.235.
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT· CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
July 2004
Page 1
IUnplanned Events less than or equal to 1 hour
7/1
7/11/2004
7/11/2004
7/11/2004
7/11/2004
7/11/2004
7/11/2004
7/11/2004
7/12/2004
1120-1
1140-1145
1330-1335
1410-1415
1445-1450
1510-1515
1545-1550
1555-1600
1025-1030
TOTAL
152 Not unplanned events
152 are less than or equal to 1 hour
152
152
45
152
45
152
156
required for unplanned events which
are less than or equal to 1 hour
1,158
IUnplanned Events greater than 1 hour
TOTAL
o
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
8 attachments
7/9/2004 2020-2025 135
7/9/2004 2055-2100 156
7/1 0/2004 0000-0005 8
7/1 0/2004 0015-0020 135
7/10/2004 0040-0045 35
7/1 0/2004 0515-0520 408
7/1 0/2004 1051-1056 408
7/1 0/2004 1100-1105 8
TOTAL 1,301
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mct
TOTAL
1,532
See attachments
1,532
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour 0
Planned Events < 1 hour and not 1,301
exceeding 5,000 MCF
Planned Events> 1 hour or 1,532
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME 37,769
8/9/2004
9:39 AM
REPORT NO: 04-0265
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP
DATE: 01 Jul 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 12:05 12:07 0 Hrs 2 Mins 0 0 ~ 8 MSCF
TOTAL VOLUME
8 MSCF
First Determination of Cause:
1. T /C 1803 vented down after valve sequence.
Action Taken to Stop Flaring:
1. T /C 1803 depressured to stand by pressure
Wednesday, July 28, 2004
Page 1 of 1
REPORT NO: 04-0266
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP
DATE: 02 Jul 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 13:05 16:30 3 Hrs 25 Mins 0 0 ~ 1 ,532 MSCF
TOTAL VOLUME 1,532 MSCF
Wednesday, July 28,2004 Page 1 of 1
FACILITY: CCP
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
REPORT NO: 04-0281
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 09 Jul 2004
TIME OF FLARING
Start Stop Duration
20:20 20:25 0 Hrs
20:55 21 :00 0 Hrs
First Determination of Cause:
1. Shut down T /C 1805 for maint.
2. Shut down T/C 1810 for maint.
Action Taken to Stop Flaring:
1. Depressured unit
2. Depressured unit
Wednesday, July 28,2004
Intermittent
5 Mins 0
5 Mins 0
Black
Smoke Planned VOLUME
0 ~ 135 MSCF
0 ~ 156 MSCF
TOTAL VOLUME 291 MSCF
Page 1 of 1
REPORT NO: 04-0282
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP DATE: 10 Jul 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 00:00 00:05 OHrs 5Mins 0 0 ~ 8 MSCF
2. Flare/Relief Valve 00:15 00:20 OHrs 5Mins 0 0 ~ 135 MSCF
3. Flare/Relief Valve 00:40 00:45 OHrs 5Mins 0 0 ~ 35 MSCF
4. Flare/Relief Valve 05:15 05:20 OHrs 5Mins 0 0 ~ 408 MSCF
5. Flare/Relief Valve 10:51 10:56 OHrs 5Mins 0 0 ~ 408 MSCF
6. Flare/Relief Valve 11:00 11:05 o Hrs 5 Mins 0 0 ~ 8 MSCF
TOTAL VOLUME 1,002 MSCF
First Determination of Cause:
1. T/C 1805 spin cooling.
2. Shut down T/C 1806 due taps slow down.
3. T/C 1810 spin cooling.
4. T/C 1876 shut down for maint.
5. T/C 1878 shut down for maint.
6. T/C 1805 taken out of crank mode.
Action Taken to Stop Flaring:
1. Unit taken off of spin cool.
2. Oepressured unit.
3. Unit taken off spin cool.
4. Unit depressured.
5. Unit depressured
6. Unit given a stop.
Wednesday, July 28, 2004
Page 1 of 1
".
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000000
12. Facility Name
PBU CCP/FFGU
Disposition
3. Field
PBU - EOA
Volume MCF
14. Operator 15. MonthNear of Disposition
BP August-2004
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
2,905,641
Pool Name
PRUDHOE
PBU Midnight Sun Undefined
Pool Code
640150
640158
Percent
7. Reinjected
178,436,298
99.75%
0.25%
8. Flared or vented 1 hour or less
2,760
9. Flared or vented more than 1 hour (see instr.)
o
10. Pilot and Purge
33,907
11. Used for lease operations (specify in Remarks)
5,337,810
12. Other (see instructions)
o
Authorization >1 hr:
Safety
MCF
13. TOTAL VOLUME (ITEMS 6-12)
186,716,416
Lease Use
MCF
14. NGL Gas Equivalent
o
Conservation
MCF
15. Purchased gas
o
Waste:
MCF
16. Transferred from: FS1. FS2, FS3, GC1. GC2. GC3
199,846,239
17. Transferred to: (Express as a negative #) CGF
-15,380,164
Commissioner
Date
18. Remarks: Block 11: Fuel Gas = 5,337,810 rosef and Assist Gas = 0 rosef
'hore:::::'hQn]:;Z:'"" Om 00& ~ my k_',dg'.
Printed Name
Robert A. Reynolds
Phone (907)564-5028
Title Manager, State Taxes and Royalty
Date ~ J /:>'/ b 7'
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authoritv 20 AAC25.235.
Form 10-422 Rev. 1/2004
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
August 2004
IUnplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
8/18/2004 0220-0225 135 Not required for unplanned events which
8/18/2004 1615-1620 109 are less than or equal to 1 hour
8/18/2004 1650-1655 109
8/18/2004 1755-1800 109
8/18/2004 2100-2105 109
8/18/2004 2205-2210 109
8/19/2004 0440-0445 109
8/22/2004 1130-1135 135
8/23/2004 1515-1520 135
TOTAL
1,059
IUnplanned Events greater than 1 hour
DATE TIME VOWME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL
o
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Met
DATE TIME VOLUME DESCRIPTION OFJNCIDENT & CAUSE
8/12/2004 0030-0035 135 See attachments
8/12/2004 0400-0405 51
8/12/2004 0710-0715 135
8/12/2004 1 000-1 005 51
8/12/2004 1545-1550 135
8/13/2004 1230-1235 51
8/14/2004 2000-2015 420
8/16/2004 0030-0040 420
8/16/2004 0430-0435 135
8/17/2004 1100-1105 51
8/20/2004 0745-0750 109
8/22/2004 0700-0703 8
TOTAL
1,701
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Met
See attachments
TOTAL
o
Unplanned Events" 1 Hour
Unplanned Events;. 1 Hour
Planned Events" 1 hour and not
exceeding 5,000 MCF
Planned Events;. 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
o
1,701
o
TOTAL FLARED VOLUME
36,667
Page 1
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
9/10/2004
11:09AM
REPORT NO: 04-0344
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP DATE: 12 Aug 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 00:30 00:35 OHrs 5Mins 0 0 ~ 135 MSCF
2. Flare/Relief Valve 04:00 04:05 OHrs 5 Mins 0 0 ~ 51 MSCF
3. Flare/Relief Valve 07:10 07:15 OHrs 5Mins 0 0 ~ 135 MSCF
4. Flare/Relief Valve 10:00 10:05 OHrs 5Mins 0 0 ~ 51 MSCF
5. Flare/Relief Valve 15:45 15:50 OHrs 5 Mins 0 0 ~ 135 MSCF
TOTAL VOLUME 507 MSCF
First Determination of Cause:
1. Shut down T /C 1802 for scheduled maintenance.
2. T/C 1802 shut down, for scheduled maintenance.
3. T/C 1805 shut down, for spin cool, prep for scheduled maintenance.
4. T/C 1805 spin cooling complete.
5. T/C 1804 shut down for scheduled maintenance.
Action Taken to Stop Flaring:
1. Turbine Compressor 1802 depressured for spin cooling.
2. T/C 1802 shut down, depressured for scheduled maint. Spin cooling complete.
3. T/C 1805 shut down, depressured. Spin Cooling started.
4. T/C 1805 shut down, depressured for scheduled maint. Spin cooling complete.
5. T/C 1804 depressured for scheduled maint.
VVednesday,August25,2004
Page 1 of 1
FACILITY: CCP
SYSTEM
1. Flare/Relief Valve
REPORT NO: 04-0349
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 13 Aug 2004
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned
12:30 12:35 OHrs 5Mins 0 0 ~
TOTAL VOLUME
First Determination of Cause:
1. T /C 1804 Shut down after water wash completed for maintenance.
Action Taken to Stop Flaring:
1. T /C 1804 depressured in preperation for maintenance work.
VVednesday,August25,2004
VOLUME
51 MSCF
51 MSCF
Page 1 of 1
REPORT NO: 04-0351
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP
DATE: 14 Aug 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 20:00 20:15 OHrs 15Mins 0 0 ~ 420 MSCF
TOTAL VOLUME
420 MSCF
First Determination of Cause:
1. Shutdown (ESD) T/C 1878 for maintenance
Action Taken to Stop Flaring:
1. Depressured T/C 1878
VVednesday, August 25, 2004
Page 1 of 1
REPORT NO: 04-0353
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP
DATE: 16 Aug 2004
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
00:30 00:40 OHrs 10 Mins 0 0 ~ 420 MSCF
04:30 04:35 OHrs 5Mins 0 0 ~ 135 MSCF
TOTAL VOLUME 555 MSCF
First Determination of Cause:
1. Shutdown T /C 1876 for scheduled maintenance
2. Shutdown T/C 1808 for scheduled maintenance
Action Taken to Stop Flaring:
1. Depressured T/C 1876
2. Depressured T /C 1808
Friday, September 03, 2004
Page 1 of 1
REPORT NO: 04-0372
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP
DATE: 17 Aug 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 11 :00 11 :05 0 Hrs 5 Mins 0 0 ~ 51 MSCF
TOTAL VOLUME
51 MSCF
First Determination of Cause:
1. T/C 1808 shut down water wash complete, ready for maintenance.
Action Taken to Stop Flaring:
1. T/C 1808 depressured, ready for maintenance.
VVednesday, August 25, 2004
Page 1 of 1
REPORT NO: 04-0385
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP
DATE: 20 Aug 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 07:45 07:50 0 Hrs 5 Mins 0 0 ~ 109 MSCF
TOTAL VOLUME
109 MSCF
First Determination of Cause:
1. TC 1808 shut down for fuel gas calibration.
Action Taken to Stop Flaring:
1. TC 1808 finished depressuring.
VVednesday, August 25, 2004
Page 1 of 1
FACILITY: CCP
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 22 Aug 2004
TIME OF FLARING
Start Stop Duration
07:00 07:03 0 Hrs
11 :30 11 :35 0 Hrs
Intermittent
3 Mins 0
5 Mins 0
First Determination of Cause:
1. TC 1808 check valve test.
2. TC 1808 tripped due to instrumentation problem.
Action Taken to Stop Flaring:
1. Completed test.
2. TC 1808 finished depressuring and then restarted.
VVednesday,August25,2004
REPORT NO: 04-0390
Black
Smoke Planned VOLUME
0 ~ 8 MSCF
0 0 135 MSCF
TOTAL VOLUME 143 MSCF
Page 1 of 1
...
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000000
/2. Facility Name
PBU CCP/FFGU
Disposition
3. Field
PBU - EOA
Volume MCF
6. Sold
3,890,801
7. Reinjected
186,355,570
8. Flared or vented 1 hour or less
1,760
9. Flared or vented more than 1 hour (see instr.)
o
10. Pilot and Purge
32,689
11. Used for lease operations (specify in Remarks)
5,251,290
12. Other (see instructions)
o
13. TOTAL VOLUME (ITEMS 6-12)
195,532,110
14. NGL Gas Equivalent
o
15. Purchased gas
o
16. Transferred from: FS1. FS2, FS3. GC1, GC2. GC3
211,076,483
17. Transferred to: (Express as a negative #) CGF
-17,594,515
18. Remarks: Block 11: Fuel Gas = 5,251,290 mscf and Assist Gas = 0 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature Å- ~'""'-- ,~
14. Operator 15. MonthNear of Disposition
BP September-2004
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
Pool Name
PRUDHOE
~BU Midnight Sun Undefined
Pool Code
640150
640158
Percent
99.75%
0.25%
Authorization >1 hr:
MCF
Safety
MCF
Lease Use
Conservation
MCF
Waste:
MCF
Commissioner
Date
Printed Name
Robert A. Reynolds
Phone (907)564-5028
Title Manager, State Taxes and Royalty
Date {o --\ <6 - G'f
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authoritv 20 AAC25.235.
Form 10-422 Rev. 1/2004
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
September 2004
IUnplanned Events less than or equal to 1 hour
0240-0248
TOTAL
408 required events which
are less than or equal to 1 hour
408
IUnplanned Events greater than 1 hour
TOTAL
See attachments
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
o
DATE
9/28/2004
9/28/2004
9/28/2004
9/28/2004
9/29/2004
9/29/2004
9/29/2004
9/29/2004
9/29/2004
9/29/2004
9/30/2004
9/30/2004
9/30/2004
9/30/2004
9/30/2004
9/30/2004
9/30/2004
9/30/2004
9/30/2004
TIME
2030-2035
2033-2038
2050-2055
2345-2346
0030-0035
0130-0135
0230-0235
0245-0250
1530-1535
1940-1945
0110-0115
0248-0253
0615-0620
0920-0935
1215-1220
1445-1450
1550-1600
2200-2205
2353-2358
TOTAL
VOLUME DESCRIPTION OF INCIDENT & CAUSE
156 See attachments
135
135
35
14
45
8
14
135
14
8
141
8
156
156
135
35
14
8
1,352
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
attachments
o
o
1,352
o
34,449
Page 1
unplanned events
are less than or equal to 1 hour
attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
10/6/2004
10:53 AM
REPORT NO: 04-0472
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP DATE: 28 Sep 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 20:30 20:35 OHrs 5Mins 0 0 ~ 156 MSCF
2. Flare/Relief Valve 20:33 20:38 OHrs 5 Mins 0 0 ~ 135 MSCF
3. Flare/Relief Valve 20:50 20:55 OHrs 5Mins 0 0 ~ 135 MSCF
4. Flare/Relief Valve 23:45 23:46 OHrs 1 Mins 0 0 ~ 35 MSCF
TOTAL VOLUME 461 MSCF
First Determination of Cause:
1. Planned Shut Down for T /C 1812
2. Planned Shut Down for T /C 1805
3. Planned Shut Down ForT/C 1807
4. Planned Blow Down for T /C 1812 for Energy Isolation.
Action Taken to Stop Flaring:
1. Depressured
2. Depressured
3. Depressured
4. Depressured
Tuesday, October 05, 2004
Page 1 of 1
REPORT NO: 04-0474
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP DATE: 29 Sep 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 00:30 00:35 OHrs 5Mins 0 0 ~ 14 MSCF
2. Flare/Relief Valve 01:30 01:35 o Hrs 5Mins 0 0 ~ 45 MSCF
3. Flare/Relief Valve 02:30 02:35 o Hrs 5Mins 0 0 ~ 8 MSCF
4. Flare/Relief Valve 02:40 02:48 o Hrs 8Mins 0 0 0 408 MSCF
5. Flare/Relief Valve 02:45 02:50 o Hrs 5Mins 0 0 ~ 14 MSCF
6. Flare/Relief Valve 15:30 15:35 OHrs 5Mins 0 0 ~ 135 MSCF
7. Flare/Relief Valve 19:40 19:45 OHrs 5Mins 0 0 ~ 14 MSCF
TOTAL VOLUME 638 MSCF
First Determination of Cause:
1. tic 1807 water wash
2. tic 1807 water wash
3. tic 1807 water wash
4. tic 1878 tripped off line
5. tic 1805 water wash
6. tic 1804 water wash
7. tic 1804 water wash
Action Taken to Stop Flaring:
1. Oepressured
2. Oepressured
3. Oepressured
4. restarted tic 1878
Tuesday, October 05, 2004
Page 1 of 2
FACILITY: CCP
~ J!': Oepressured
b M. Oepressured
7 y Oepressured
Tuesday, October 05, 2004
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 29 Sep 2004
REPORT NO: 04-0474
Page 2 of 2
REPORT NO: 04-0473
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP DATE: 30 Sep 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 01:10 01:15 OHrs 5Mins 0 0 ~ 8 MSCF
2. Flare/Relief Valve 02:48 02:53 OHrs 5Mins 0 0 ~ 141 MSCF
3. Flare/Relief Valve 06:15 06:20 OHrs 5Mins 0 0 ~ 8 MSCF
4. Flare/Relief Valve 09:20 09:35 OHrs 15 Mins 0 0 ~ 156 MSCF
5. Flare/Relief Valve 12:15 12:20 OHrs 5Mins 0 0 ~ 156 MSCF
6. Flare/Relief Valve 14:45 14:50 OHrs 5Mins 0 0 ~ 135 MSCF
7. Flare/Relief Valve 15:50 16:00 OHrs 10 Mins 0 0 ~ 35 MSCF
8. Flare/Relief Valve 22:00 22:05 OHrs 5Mins 0 0 ~ 14 MSCF
9. Flare/Relief Valve 23:53 23:58 o Hrs 5Mins 0 0 ~ 8 MSCF
TOTAL VOLUME 661 MSCF
First Determination of Cause:
1. tic 1804 water wash
2. TC 1804 ESD'd for water wash.
3. tic 1801 water wash
4. TC1812 ESD'd for leaking PSV after water wash.
5. TC1810 ESD'd for water wash.
6. TC1806 normal stop to spin cool for water wash.
7. TC1810 stopped for maintaince & water wash
8. tic 1806 stopped for water wash
9. tic 1807 shutdown for water wash
Tuesday, October 05, 2004
Page 1 of 2
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP
DATE: 30 Sep 2004
Action Taken to Stop Flaring:
1. Oepressured
2. Oepressured
3. Oepressured
4. Oepressured
5. Oepressured
6. Oepressured
7. Oepressured
8. Oepressured
9. Oepressured
Tuesday, October 05, 2004
REPORT NO: 04-0473
Page 2 of 2
· .
t,
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000000
12. Facility Name
PBU CCP/FFGU
Disposition
3. Field
PBU - EOA
Volume MCF
14. Operator 15. Month/Year of Disposition
BP October-2004
20. For production from multiple pools. list contribution of each pool as a percent of
Total Volume.
6. Sold
3,875,451
Pool Code
640150
Pool Name
PRUDHOE
7. Reinjected
213,115,679
8. Flared or vented 1 hour or less
2,106
9. Flared or vented more than 1 hour (see instr.)
o
10. Pilot and Purge
33,813
11. Used for lease operations (specify in Remarks)
6,035,179
Percent
100.00%
12. Other (see instructions)
°
Authorization> 1 hr:
Safety
MCF
13. TOTAL VOLUME (ITEMS 6-12)
223,062,228
Lease Use
14. NGL Gas Equivalent
o
./
15. Purchased gas °
Waste:
16. Transferred from: CGF & FS1 223,062,228
17. Transferred to: (Express as a negative #) 0
18. Remarks: Block 11: Fuel Gas = 6,035,179 mscf and Assist Gas = 0 mscf
I hereby certify that the foregoing is true and correct to the beS~Wledge.
s;g",wre.~~
Printed Name Bernard W. Hajny
MCF
MCF
D'"I;;r~f
Title Manager, Production Taxes and Royalty
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authoritv 20 AAC25.235.
Phone (907)564-5028
Date Ll- \ '1 -oL{
Form 10-422 Rev. 1/2004
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
October 2004
Page 1
IUnplanned Events less than or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
o
IUnplanned Events greater than 1 hour
See attachments
See attachments
TOTAL
o
Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
See attachments
10/1/2004
10/1/2004
10/1/2004
10/1/2004
10/1/2004
10/1/2004
10/1/2004
1 0/1/2004
10/1/2004
10/1/2004
1 0/2/2004
1 0/2/2004
1 0/2/2004
1 0/2/2004
1 0/2/2004
1 0/2/2004
1 0/2/2004
1 0/3/2004
1 0/3/2004
10/4/2004
1 0/5/2004
0100-0105
0345-0350
0355-0400
0450-0455
0530-0535
0910-0925
0945-0955
1740-1755
2245-2250
2300-2305
0236-0251
0550-0600
0740-0750
0815-0825
1705-1715
1900-1910
2330-2340
1235-1250
1505-1515
1800-1810
0020-0030
8 See attachments
91
141
159
32
156
135
156
8
32
141
8
8
8
32
408
152
135
35
152
109
TOTAL
2,106
11/9/2004
10:58 AM
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
October 2004
Page 2
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
See attachments
See attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
o
2,106
o
35,919
11/9/2004
10:58 AM
REPORT NO: 04-0476
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP DATE: 01 Oct 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 01:00 01:05 OHrs 5Mins 0 0 ~ 8 MSCF
2. Flare/Relief Valve 03:45 03:50 OHrs 5Mins 0 0 ~ 91 MSCF
3. Flare/Relief Valve 03:55 04:00 OHrs 5Mins 0 0 ~ 141 MSCF
4. Flare/Relief Valve 04:50 04:55 OHrs 5Mins 0 0 ~ 159 MSCF
5. Flare/Relief Valve 05:30 05:35 OHrs 5Mins 0 0 ~ 32 MSCF
6. Flare/Relief Valve 09:10 09:25 OHrs 15 Mins 0 0 ~ 156 MSCF
7. Flare/Relief Valve 09:45 09:55 o Hrs 10 Mins 0 0 ~ 135 MSCF
8. Flare/Relief Valve 17:40 17:55 OHrs 15 Mins 0 0 ~ 156 MSCF
9. Flare/Relief Valve 22:45 22:50 OHrs 5Mins 0 0 ~ 8 MSCF
10. Flare/Relief Valve 23:00 23:05 OHrs 5Mins 0 0 ~ 32 MSCF
TOTAL VOLUME 918 MSCF
First Determination of Cause:
1. tic 1807 tripped-starting clutch trouble
2. tic 1810 shutdown-water wash complete
3. tic 1813 shutdown for water wash
4. tic 1809 shutdown for water wash
5. tic 1809 tripped on spincool
6. TC 1809 depressured for water wash
7. TC 1813 depressured for water wash
8. TC1811 depressured for water wash
9. tic 1806 shutdown for water wash
10. tic 1811 shutdown-spincool complete
Friday, October 22, 2004
Page 1 of 2
bp
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP
DATE: 01 Oct 2004
Action Taken to Stop Flaring:
1. depressured
2. depressured
3. depressured
4. depressured
5. depressured
6. Oepressured
7. Oepressured
8. Oepressured
9. depressured
10. depressured
Friday, October 22,2004
REPORT NO: 04-0476
Page 2 of 2
REPORT NO: 04-0480
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP DATE: 02 Oct 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 02:36 02:51 OHrs 15 Mins 0 0 ~ 141 MSCF
2. Flare/Relief Valve 05:50 06:00 OHrs 10 Mins 0 0 ~ 8 MSCF
3. Flare/Relief Valve 07:40 07:50 OHrs 10 Mins 0 0 ~ 8 MSCF
4. Flare/Relief Valve 08:15 08:25 OHrs 10 Mins 0 0 ~ 8 MSCF
5. Flare/Relief Valve 17:05 17:15 OHrs 10 Mins 0 0 ~ 32 MSCF
6. Flare/Relief Valve 19:00 19:10 OHrs 10 Mins 0 0 ~ 408 MSCF
7. Flare/Relief Valve 23:30 23:40 OHrs 10 Mins 0 0 ~ 152 MSCF
TOTAL VOLUME 757 MSCF
First Determination of Cause:
1. TC1803 ESD'd for water wash
2. TC1803 shutdown from spin cool
3. TC1813 shutdown after water wash
4. TC1803 depressured from spin cool
5. TC1811 stopped after water wash
6. T/C 1876 SHUTDOWN FOR WATER WASH AND MAINTENANCE
7. T/C 1876 SHUT FROM SPINCOOL MODE
Action Taken to Stop Flaring:
1. Depressured
2. Depressured
3. Depressured
4. Depressured
Friday, October 22, 2004
Page 1 of 2
FACILITY: CCP
<; 4' Depressured
" ~ DEPRESSURED UNIT
7 X DEPRESSURED UNIT..
Friday, October 22, 2004
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 02 Oct 2004
REPORT NO: 04-0480
Page 2 of 2
REPORT NO: 04-0481
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP
DATE: 03 Oct 2004
SYSTEM
1. FlarelRelief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
12:35 12:50 OHrs 15 Mins 0 0 ~ 135 MSCF
15:05 15:15 OHrs 10Mins 0 0 ~ 35 MSCF
TOTAL VOLUME 170 MSCF
First Determination of Cause:
1. TC1813 has leak in gear box cover. Shut down to spin cool for reapair.
2. TC1813 shut down after spin cool. Working on gear box cover.
Action Taken to Stop Flaring:
1. Depressured
2. Depressured
Friday, October 22, 2004
Page 1 of 1
bp
REPORT NO: 04-0487
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP
DATE: 04 Oct 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 18:00 18:10 OHrs 10Mins 0 0 ~ 152 MSCF
TOTAL VOLUME
152 MSCF
First Determination of Cause:
1. tic 1876 shutdown for water wash......
Action Taken to Stop Flaring:
1. depressure for water wash
Friday, October 22, 2004
Page 1 of 1
REPORT NO: 04-0484
t
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP
DATE: 05 Oct 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 00:20 00:30 0 Hrs 10 Mins 0 0 ~ 109 MSCF
TOTAL VOLUME
109 MSCF
First Determination of Cause:
1. T/C 1876 TRIPPED ON A WATER WASH
Action Taken to Stop Flaring:
1. DEPRESSURE AND RESTARTED
Friday, October 22, 2004
Page 1 of 1
~
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000000
12. Facility Name
PBU CCP/FFGU
Disposition
3. Field
PBU - EOA
Volume MCF
14. Operator 15. MonthNear of Disposition
BP November-2004
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
4,139,041
Pool Name
PRUDHOE
Pool Code
640150
Percent
100.00%
7. Reinjected
223,034,377
8. Flared or vented 1 hour or less
1,579
9. Flared or vented more than 1 hour (see instr.)
o
10. Pilot and Purge
32,689
11. Used for lease operations (specify in Remarks)
6,127,012
12. Other (see instructions)
o
Authorization> 1 hr:
Safety
MCF
13. TOTAL VOLUME (ITEMS 6-12)
233,334,698
Lease Use
MCF
14. NGL Gas Equivalent
o
Conservation
MCF
15. Purchased gas
o
Waste:
MCF
16. Transferred from: CGF & FS1
233,334,698
17. Transferred to: (Express as a negative #)
o
Commissioner
Date
18. Remarks: Block 11: Fuel Gas = 6,127,012 msef and Assist Gas = 0 msef
I hereby certify that ~. ~f"-:;'" ;'.. j '7;"' ~,. ffof.h:7best of my knowledge.
Signature I µ1...,....,.1' , . i
{ .
Printed Name Bernard W. Hajny
Phone (907)564-5028
Date /,;¿-/~--tìl
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authoritv 20 AAC25.235.
Title Manager, Production Taxes and Royalty
Form 10-422 Rev. 1/2004
Submit in Duplicate
...
po
SP EXPLORATION (ALASKA) INC.
PRUDHOE SAY UNIT· CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
November 2004
Page 1
IUnplanned Events less than or equal to 1 hour
11/30/2004
11/30/2004
11/30/2004
11/30/2004
11/30/2004
11/30/2004
11/30/2004
11/30/2004
11/30/2004
1240-1250
1350-1355
1420-1425
1440-1445
1505-1510
1520-1525
2130-2135
2230-2235
2310-2315
408 required for unplanned events which
109 are less than or equal to 1 hour
109
109
109
109
109
109
408
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
1,579
Events greater than 1 hour
attachments
attachments
TOTAL
o
(Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Met
See attachments
See attachments
TOTAL
o
Events
1 Hour OR
5000 Met
attachments
attachments
TOTAL 0
Unplanned Events < 1 Hour 1,579
Unplanned Events> 1 Hour 0
Planned Events < 1 hour and not 0
exceeding 5,000 MCF
Planned Events> 1 hour or 0
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME 34,268
12/6/2004
4:05 PM
.~
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000000
12. Facility Name
PBU CCP/FFGU
Disposition
3. Field
PBU - EOA
Volume MCF
14. Operator 15. MonthNear of Disposition
BP December-2004
20. For production from multiple pools. list contribution of each pool as a percent of
Total Volume.
6. Sold
3,768,751
Pool Name
PRUDHOE
Pool Code
640150
Percent
100.00%
7. Reinjected
233,122,274
8. Flared or vented 1 hour or less
803
9. Flared or vented more than 1 hour (see instr.)
o
10. Pilot and Purge
33,774
11. Used for lease operations (specify in Remarks)
6,468,004
12. Other (see instructions)
o
Authorization >1 hr:
Safety
MCF
13. TOTAL VOLUME (ITEMS 6-12)
243,393,606
Lease Use
MCF
14. NGL Gas Equivalent
o
Conservation
MCF
15. Purchased gas
o
Waste:
MCF
16. Transferred from: CGF & FS1
243,393,606
17. Transferred to: (Express as a negative #)
o
Commissioner
Date
18. Remarks: Block 11: Fuel Gas = 6,468,004 mscf and Assist Gas = 0 mscf
I hereby certify that the !oregJo¡ng is trule an~corr t to the best of my knowledge.
/Ll /ì
Signature I~ l /
./ .
, v
Printed Name Bernard W. Hajny
Phone (907)564-5028
Title Manager, Production Taxes and Royalty
Date /--/'1 -() 5:-
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authoritv 20 AAC25.235.
Form 10-422 Rev. 1/2004
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE SAY UNIT - CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
December 2004
Page 1
IUnplanned Events less than or equal to 1 hour
1245-1250
0130-0135
0800-0815
0756-0855
152 Not required for unplanned events which
159 are less than or equal to 1 hour
135
110
12/13/2004
12/18/2004
12/19/2004
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
556
IUnplanned Events greater than 1 hour
See attachments
See attachments
TOTAL
o
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
12/18/2004 1245-1250 14 See attachments See attachments
12/21/2004 1620-1625 8
12/21/2004 1650-1700 45
12/21/2004 1745-1755 45
12/21/2004 1830-1845 135
TOTAL 247
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
See attachments
See attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
o
247
o
34,577
1/10/2005
3:20 PM
REPORT NO: 04-0561
BPXA FLARE REPORT
PRUDHOE BAY
R.Ef-. . E"""· '.'
.. .. ·*4~ ~ ,~'~ 1
JAN 2 n '''00··'
. . .' U L "j
FACILITY: CCP
DATE: 18 Dee 2004
Alaska
.'
u
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
08:00 08:15 OHrs 15 Mins ~ 0 0 135 MSCF
12:45 12:50 OHrs 5Mins 0 0 ~ 14 MSCF
TOTAL VOLUME 149 MSCF
First Determination of Cause:
1. T/C 1804 shut down due to high vibration
2. T/C 1804 bled down after spin cool
Action Taken to Stop Flaring:
1. Bled down unit
2. Unit through bleeding down
Tuesday, December 21, 2004
Page 1 of 1
REPORT NO: 04-0566
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CCP DATE: 21 Dee 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 16:20 16:25 OHrs 5Mins 0 0 ~ 8 MSCF
2. Flare/Relief Valve 16:50 17:00 OHrs 10Mins 0 0 ~ 45 MSCF
3. Flare/Relief Valve 17:45 17:55 OHrs 10Mins 0 0 ~ 45 MSCF
4. Flare/Relief Valve 18:30 18:45 OHrs 15 Mins 0 0 ~ 135 MSCF
TOTAL VOLUME 233 MSCF
First Determination of Cause:
1. Pressure test T /C 1804
2. Pressure test T/C 1804
3. Depressued T /C 1804 after water wash
4. Depressued T/C 1804 to check oil flow problem
Action Taken to Stop Flaring:
1. Check complete, depressured to 50#
2. Check complete, depressued to 50#
3. Unit depressured
4. Unit depressured
Tuesday, December 28, 2004