Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutPBU CGF B / BP Exploration
STATE OF ALASKA
AOGCC
GAS DISPOSITION FILES
YEAR: 2004
FACILITY: PBU CGF B
OPERATOR: BP EXPLORATION
.,
CENTRAL GAS FACILITY
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 01/2004
Facility
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
1. Sold
2,782,435
Pool Name
Code
Percent
2. Reinjected
11,060,787
PRUDHOE
640150
100.00%
3. Flared or vented less than 1 hour.
1 ,449
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
2,810
5. Pilot and Purge
25,545
6. Used for lease operations
Fuel
Assist
3,445,893
41 ,737
7. Other
Lift Gas, Off Field
MI to GPMA
o
2,267,374
TOTAL items 1 - 7
19,628,030
1. Safety
~ ß\ D MCF <{¡sf?-
8. NGL gas equivalent produced
2,782,435
2. Lease Use
MCF
9. Purchased gas
o
3. Conserv. Purposes
MCF
11. Transferred to: FS1, FS2, FS3
1,747,526
10. Transferred from: CCP
21,375,556
Remarks:
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
Signature:
Form 10-422 (Revised 4/95)
Title: SUPERVISOR
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
January 2004
Page 1
Unplanned Events less than or equal to 1 hour
1/7/2004
1/24/2004
1600-1700
1122-1212
1,161 Not required for unplanned events which
98 are less than or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
1,259
Unplanned Events greater than 1 hour
See attachments
See attachments
TOTAL
o
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT 6< CAUSE
1/7/2004 1507 -1537 190 See attachments
ACTION TAKEN TO ELlMINATI!: CAUSE
See attachments
TOTAL
190
1/7/2004
0557-0811
2,810 See attachments
See attachments
TOTAL
2,810
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
1,259
o
190
2,810
71,541
2/6/2004
10:42 AM
REPORT NO: 04-0008
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF
DATE: 07 Jan 2004
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
3. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
05:57 08:11 2Hrs 14 Mins 0 0 ~ 2,810 MSCF
15:07 15:37 OHrs 30Mins 0 0 ~ 190 MSCF
16:00 17:00 1 Hrs OMins ~ 0 0 1;161 MSCF
TOTALVOLUJI/IE 4,161 ~MSCF
First Determination of Cause:
1. Shutdown MI#2 for maintenance MTR#660
2. Shut down tandem #4 for maintenance. MTR#618
3. Had to BESD MI#2 3 times to straighten out logic. Volume indicated by meter#618
Action Taken to Stop Flaring:
1. Adjusted plant operations.
2. Completed blowdown of tanden compressor.
3. Blowdown completed.
Tuesday, January 20,2004
Page 1 of 1
1l7/04 CGF Flaring Event
To: Steve McMains, AOGCC
steve mcmains@admin.state.ak.us
907-793-1241, fax 907-276-7542
From: Hal Tucker, GPB Prod Optim Team Leader, 907-659-4472 or
907-659-5566
Two flaring events (in excess of one hour) occurred at CGF on January 7,
2004. The first event occurred when MI compressor 1855 was shut down to
repair an integrity concern. When the MI compressors are shut down MI is
backed out of the system gradually to allow the plant to adjust to
changing process temperatures and levels, thus avoiding a more severe
plant upset. Total duration and volume for this event were 2 hours and 14
minutes and 2,180 MSCF.
/
The second event was during restart of the same machine. Logic problems
caused 1855 to require four restart attempts. Three times the machine had
to be shutdown and blown down before logic was fixed and a successful
restart was achieved. Total duration and volume for this event were 1
hour and 1,161 MSCF.
Please call or email if you need additional clarification.
Thank you,
Hal Tucker
Greater Prudhoe Bay production Optimization Team Leader
"'I of 1
1/12/20047:26 AM
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 02/2004
CENTRAL GAS FACILITY
Disposition Volume MCF*
1. Sold 2,721,478
2. Reinjected 10,276,505
3. Flared or vented less than 1 hour. 3,691
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 23,924
6. Used for lease operations Fuel 3,329,507
Assist 34,432
7. Other Lift Gas, Off Field 0
MI to GPMA 2,119,266
TOTAL items 1 - 7 18,508,803
8. NGL gas equivalent produced 2,721,478
9. Purchased gas 0
10. Transferred from: CCP 20,165,352
11. Transferred to: FS1, FS2, FS3 1,656,549
Remarks:
I hereby ce(j. that t! foregoi1 is true and correct to the best of my knowledge.
Signature: .n. .A U·i\. iJ. Title: SUPERVISOR
Form 10-422 (Revised 4/95)
"Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
February 2004
Page 1
~Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
2/18/2004 0120-0135 328 Not required for unplanned events which
2/18/2004 0120-0219 3,173 are less than or equal to 1 hour
2/28/2004 2203-2235 190
TOTAL 3,691
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
~Unplanned Events greater than 1 hour
DATE· TIME VOLUME
DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL
o
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mef
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL
o
~Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT 6< CAUSE
See attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
3,691
o
o
o
TOTAL FLARED VOLUME
62,047
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAK¡::N TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
3/5/2004
2:07 PM
..
Facility
CENTRAL GAS FACILITY
Disposition
1. Sold
2. Reinjected
3. Flared or vented less than 1 hour.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 03/2004
Volume MCF*
2,916,192
11,025,940
1,464
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge
6. Used for lease operations
7. Other
TOTAL items 1 - 7
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from: CCP
11. Transferred to: FS1, FS2, FS3
Remarks:
25,387
25,767
Fuel
Assist
3,578,758
46,671
Lift Gas, Off Field
MI to GPMA
o
2,310,955
19,931,134
2,916,192
o
21,669,978
1,738,844
Signature:
Form 10-422 (Revised 4/95)
is true and correct to the best of my knowledge.
Title: SUPERVISOR
"Indicate contribution of each pool to total.
Pool Name
Code
Percent
PRUDHOE
640150
100.00%
1. Safety
z~ 387 MCF 3ß.e../
2. Lease Use
MCF
MCF
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
March 2004
3/20/2004
3/20/2004
3/20/2004
3/20/2004
0631-0711
0845-0902
0850-0910
0855-0907
0858-0911
TOTAL
300 Not required for unplanned events which
195 are less than or equal to 1 hour
195
387
387
1,464
Page 1
Not required for unplanned events which
are less than or equal to 1 hour
lunplanned Events ~reater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
3/18/2004 2138-2359 1,500 See attachments
3/20/2004 0855-1240 23,887
TOTAL
25,387
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL
o
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
See attachments
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
o
25,387
o
o
99,289
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
4/8/2004
3:09 PM
REPORT NO: 04-0083
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF
DATE: 18 Mar 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 21 :3.8.. 23:59 2.Hrs 21 Mins ~ 0 D. J~50D..MSCF
TOTAL VOLUME 1,500 MSCF
First Determination of Cause:
1. 57 P72BSV Relief valve lifting early.
Action Taken to Stop Flaring:
1. Blocked in for maintance.
Tuesday, March 30, 2004
Page 1 of 1
REPORT NO: 04-0094
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF DATE: 20 Mar 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. FlarelRelief Valve 08:45 09:02 OHrs 17 Mins 0 0 0 t95,MSCF
2. Flare/Relief Valve 08:50 09:10 OHrs 20 Mins D 0 0 195 MSCF
3. Flare/Relief Valve 08:55 09:07 OHrs . 12Mins 0 0 0 387 MSGF
4. FlarelRelief Valve .08:55... 12:40 3Hrs 45Mins ~ 0 0 23,88.7 MSCF
5. Flare/Relief Valve 08:58 09:11 OHrs 13Mins 0 0 D 387 MSCF
TOTAL VOLUME 25,051 MSCF
First Determination of Cause:
1. TIC 1801 SO ONLOW'GG·{)L'PRE~SURE
2. TIC 1802 SO ON LOSS OF N2 SPEED SIGNAL
3. T/C 1805 RECYCLE TRIPPED DUE TO PROCESS UPSET
4. PROCESS UPSET DUE TO LOSS OF TIC 1805 & T/C 1855
5. T/C 1855 RECYCLE TRIPPED DUE TO PROCESS UPSET
Action Taken to Stop Flaring:
1. TIC 1801 BLEWDOWN AND WAS STARTED
2. TIC 1802 BLEW DOWN AND WAS STARTED
3. TIC 1805 COMPLETED BLOWDOWN
4. STARTED TIC 1805 & TIC 1855 + WARMED UP CHILLERS AND
L TS TEMPS
5. TIC 1855 BLEW DOWN
Tuesday, March 30, 2004
Page 1 of 1
...
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 04/2004
CENTRAL GAS FACILITY
Disposition
Volume MCF*
1. Sold
2,740,803
2. Reinjected
10,058,439
3. Flared or vented less than 1 hour.
3,182
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
18,080
5. Pilot and Purge
24,875
6. Used for lease operations
Fuel
Assist
3,346,743
56,696
7. Other
Lift Gas, Off Field
MI to GPMA
o
2,148,602
TOTAL items 1 - 7
18,397,420
8. NGL gas equivalent produced
2,740,803
9. Purchased gas
10. Transferred from: CCP
20,036,123
11. Transferred to: FS1, FS2, FS3
1,638,703
Remarks:
I hereby certify that the fore oing is true and correct to the best of my knowledge.
" ~ - '2.. 'l -0 V Title: WrCFfli 150P! v--c-t,
*Indicate contribution of each pool to total.
Pool Name
Code
Percent
PRUDHOE
640150
100.00%
1. Safety
\'6 I (Jò 0 MCF crBl-
2. Lease Use
MCF
o
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
April 2004
Page 1
lunplanned Events less than or equal to 1 hour
..... .. DAT!;. ......... .'1'IME .. . . VOLUME . .·DESCRtPTION O¡:tNCIDENT~ CAUSE ...
4/14/2004 1635-1728 133 Not required for unplanned events which
4/27/2004 0910-0925 328 are less than or equal to 1 hour
4/27/2004 1431-1443 0
4/27/2004 1834-1910 14
TOTAL
475
lunplanned Events greater than 1 hour
. DATE> TIME .. . VOLUMEDESCfllPTIONOFINCIDENT 6< CAUSE·
4/27/2004 0910-1046 14,139 See attachments
4/27/2004 1414-1520 3,554
4/27/2004 1414-1620 387
TOTAL 18,080
. .... ACT!9NTAKEN TOi:.LIMINATE CAUSE·
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELlMINATEÇAUSE
See attachments
I
1.~I~n~e~..~~:~t~..L:ss.,.~~n~~~~ual..1. ~~~r~ND .~otE~ce.eding.50?? .~Cf
..··..··>DA:Tta...···· . . ·fJ'IMS··'········ ··.....VO!4U.M§ ·.......>~§SçR!E'mIOI\l>9!7).JN.ÇID§I\I;J:f~fÇA:!;!·S§
4/9/2004 0035-0111 400 See attachments
4/9/2004 1305-1314 30
4/9/2004 1447-1451 30
4/10/2004 0020-0056 400
4/11/2004 0027-0059 430
4/11/2004 0338-0343 20
4/11/2004 0354-0400 1 0
4/11/2004 1716-1722 30
4/11/2004 1906-1956 30
4/12/2004 0033-0113 400
4/12/2004 0805-0816 30
4/26/2004 0332-0400 510
4/26/2004 0337-0352 387
TOTAL
2,707
RECEIVE
MAY 2 7 2004
Alaska Oil & Gas Cons.
Anchorage
5/27/2004
9:17 AM
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
April 2004
Page 2
~Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
<QAT~··· ..... . TIME . . VOLUME ·DESCRIPTIONOFINCIDENT&CAUSt:..···.
See attachments
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
475
18,080
2,707
102,833
o
o
. . ACTION TAKEN TO ELlMINA TECAUSE
See attachments
5/27/2004
9:17 AM
REPORT NO: 04-01 06
BPXA FLARE REPORT
PRUDHOE SAY
FACILITY: CGF
DATE: 09 Apr 2004
SYSTEM
1. Flare/Relief Valve
2. FlarelRelief Valve
3. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke
00:35 01 :11 OHrs 36Mins D 0
13:05 13:14 OHrs 9Mins D 0
14:47 14:51 OHrs '4Mins D 0
Planned .. VOLUME
~
~
~
TOTAL VOLUME
,400-MSCF
30 MSCF
·'JO'MSCf
460 MSCF
First Determination of Cause:
1. Type "B" SID on Tandem #1 forwaterwash. MTR# 618
2. Type "B" to a Type "C" on Tandem #.1 forwaterwash MTR# 618
3. PressÜred Up unit"tò80 PSIGfor rest,ai1;,logic problen'ls,;Slewdöwr'ì again with a tYpe "C"tö"O"
pressure. MTR# 618
Action Taken to Stop Flaring:
1. Depressure completed
2. Depressure to "0" completed
3. Depressure completed
Sunday, April 25, 2004
Page 1 of 1
REPORT NO: 04-0107
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF
DATE: 10 Apr 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve, 00:20 00:56 0 Hrs 36 Mins 0 0 ~400;MSGF
TOT AL VOLUME
400 MSCF
First Determination of Cause:
1. SID Tandem #4 for waterwash"MTR#618"Type "B"
Action Taken to Stop Flaring:
1. Depressure completed
Sunday, April 25, 2004
Page 1 of 1
FACILITY: CGF
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
3. Flare/Relief Valve
4. Flare/Relief Valve
5. Flare/Relief Valve
REPORT NO: 04-0112
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 11 Apr 2004
TIME OF FLARING Black
Start Stop Durätion Intermittent Smoke Planned V01.UME
00:27 00:59 O,Hrs 32.Mins 0 0 ~ 430 MSGF
03:38 03:43 OHrs 5Mins 0 0 ~ 20 MSCF
"03:54 . ·····04:00 "OHrs .' ''6'Mîns 0 0 ~ '10'MSCF
17:16 17:22 OHrs 6Mins 0 0 ~ 30 MSCF
19:06 19:56 o Hrs 50 Mins 0 0 ~ 30 MSCF
TOTAL VOLUME 520 MSCF
First Determination of Cause:
1. Tandem#3 Waterwash"Type "G" BESD" MTR#61B
2. Tandem #3 Waterwash MTR#618
3. Tandem #3 Waterwash MTR#618
4. Tandem#3 Waterwash MTR#618
5. 6-lntermittent, 3 min. burps, with 90 PSIG"MTR#618"Tandem #3 Waterwash job. PLC Logic
problems.
Action Taken to Stop Flaring:
1. Oepressure to "0" completed
2. Oepressure suffice
3. Oepressure Complete
4. Depressure complete
5. PLC Logic straightened out and waterwash started.
Sunday, April 25, 2004
Page 1 of 1
FACILITY: CGF
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 12 Apr 2004
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke
00:33 01 :13 0 Hrs 40 Mins 0 0
08:05 08:16 0 Hrs 11 Mins 0 0
REPORT NO: 04-011 3
Planned VOLUME'
~ ,400, MSCF
~ 30 MSCF
TOTAL VOLUME
430 MSCF
First Determination of Cause:
1. Tandem #2 Waterwash"Type "S" S/D",MTR#618
2. Tandem #2 Waterwash"Type "C"" 80 psi to "0""MTR#618
Action Taken to Stop Flaring:
1. Depressure complete
2. Depressure'COmpiete
Sunday, April 25, 2004
Page 1 of 1
bp
REPORT NO: 04-0141
BPXA FLARE REPORT
PRUDHOE SAY
FACILITY: CGF
DATE: 26 Apr 2004
TIME OF FLARING Black
SYSTEM Start Stop Durâtìon Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 03:32 04:00 OHÅ’ 28Mins D 0 ~ ..5.l0..MSCF
2. FlarelRelief Valve 03:37 03:52 0 Hrs 15 Mins 0 D ~ 387 MSCF
TOTAL VOLUME "897 'MSCF
First Determination of Cause:
1. SID MI T/C 1805 TO PERF{:)RM MAINTENANCE AG.TIVJTIES-REPAIR HYD PUMP,WAJ-ER
WASH, PSV PMoS-FLARE METER #660
2. INITIATED BESD OF MI TIC 1805 IN ORDER TO FULLY DEPRESSURE UNIT, IN'PREPARATION
FOR MAINTENANCE ACTIVITIES. METER #618
Action Taken to Stop Flaring:
1. ADJUSTED, (WARMED UP) REFRIGERATION AND LOW TEMPERATURE SEPARATION
PROCESS AREAS
2. UNIT FULLY DEPRESSURED AND ISOLATED
Monday, May 03, 2004
Page 1 of 1
REPORT NO: 04-0144
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF DATE: 27 Apr 2004
TIME OF FLARING
Start Stop Dura .
1. Flare/Relief Valve . 09: 10 10:46
2. Flare/Relief Valve
3. Flare/Relief Valve
4. Flare/Relief Valve
5. Other
6. Flare/Relief Valve
09:10 09:25 OHrs 15 Mins
'P4:14- '1'5':20 .' "1 "Hrs' "ô'Mins
14:14 16:20 2Hrs 6Mins
14:31 14:43 OHrs 12 Mins
18:34 19:10 OHrs 36 Mins
~
Black
Intermittent Smoke Planned 'VOLUME
0 0 0 j 4, t39 . MSCF
0 0 0 328 MSCF
0 0 0 '3;554' MSCF
~ 0 0 387 MSCF
0 ~ 0 o MSCF
0 0 0 14 MSCF
TOTAL VOLUME 18,422 .MSCF
First Determination of Cause:
1. T IC-1855 sId, resulting in Stab Overhead vent to flare
Mtr. #660
2. T/C-1855 sId - High EGT (Plant upset- Transformer problem)
Mtr.-#618
3. T/C-1805 s/d- Stabilizer Overhead vent to flare.
Mtr. #660
4. T IC-1805 s/d- depressure to flare- (process gas leak on unit)
Mtr. #618
5. HP Flare Blowcase controller L5-IC malfunctioned and opened the blowcase drain valve·totheBurn
Pit Disposal system.
Mtr.#619 (Liquids)- Volume calc as 18 gallons (.42bbls)
6. Excessive MI discharge header pressure. TIC - 1855 having trouble getiing into the header.
Mtr. #660
Action Taken to Stop Flaring:
1. Restarted T IC-1855.
2. Unit depressured
Monday, May 03,2004
Page 1 of 2
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF
DATE: 27 Apr 2004
~ XRestarted T/C-1805
~ % Unit depressured to zero.
~ %,Took manual control of L5-IC to close the drain valve.
b /1': WOA opened up MI wells to drop pressure.
Monday, May 03, 2004
'.
REPORT NO: 04-0144
Page 2 of 2
FW: GPB Flaring Incident
To:
Steve McMains, AOGCC
steve mcmains@admin.state.ak.us
907-793-1241, fax 907-276-7542
From:
Hal Tucker, GPB Prod Optim Team Leader, 907-659-4472
Two extended flare events occurred on April 27, 2004 at CGF. the first
event was due to a transformer failure which shut down turbine
compressor (TiC) 1855 at 09:10 resulting in the stabilizer overhead
venting to flare. Total duration was 1 hour and 36 minutes, total volume
was 14,139 MSCF.
The second event was a process gas leak on Tic 1805 at 14:14 resulting
in the stabilizer overhead venting to flare. Total duration was 1 hour
and 6 minutes, total volume was 3,554 MSCF. During the same period of
time, Tic 1805 was depressured to 0 (via the flare). Depressuring began
at 14:14 with a total duration of 2 hours and 6 minutes of intermittent
flaring and a total volume of 387 MSCF.
If you require additional information, please do not hesitate to call
me.
Hal Tucker
GPB Production Optimization TL
659-4472
I 'of 1
5/3/2004 11 :31 AM
...
CENTRAL GAS FACILITY
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 04/2004
Facility
Disposition
Volume MCF*
"Indicate contribution of each pool to total.
1. Sold
2,740,803
Pool Name
Code
Percent
2. Reinjected
10,058,439
PRUDHOE
640150
100.00%
,/
3. Flared or vented less than 1 hour.
17,321
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
3,941
5. Pilot and Purge
24,875
6. Used for lease operations
Fuel
Assist
7. Other
Lift Gas, Off Field
MI to GPMA
o
2,148,602
TOTAL items 1 - 7
18,397,420
1. Safety
MCF
8. NGL gas equivalent produced
2,740,803
2. Lease Use
MCF
9. Purchased gas
o
3. Conserv. Purposes
MCF
20,036,123
Commissioner
Date
1,638,703
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
Signature:
Form 10-422 (Revised 4/95)
Title: SUPERVISOR
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
April 2004
Page 1
lunplanned Events less than or equal to 1 hour
······················P:~me'WF'?"··'··'fWffiffim!M.erWF"'········"'··?"ft&':~gº¡MeFF':FF¡P:e§.'ª~!~m!~!';fW¡~!i¥W!ff:!,'ª!1!l§!';fmg~ffi,ª~º,ª§i:""""""'"
4/14/2004 1635-1728 133 Not required for unplanned events which
4/27/2004 0910-1046 14,139 are less than or equal to 1 hour
4/27/2004 0910-0925 328
4/27/2004 1431-1443 0
4/27/2004 1834-1910 14
. ""A,ª~m)f\lT~I<ENJOE,LIM'N~re'CM$E .'.
Not required for unplanned events which
are less than or equal to 1 hour
I
TOTAL
14,614
lunplanned Events greater than 1 hour . . t
i:;';'FW!¡).~'J!§Hw"············;.;.;.q¡Hm!I\1!§;"'··········"?''?""";&,:~gº·l\1!effi¡¡;ffil:;i!1?e$,ªf1flg'J!f.~JjIH~ffiffi!N,ªI!¡).eNi:¡~¡,ª~º§eFn """""'''''''iT¡WH~~T!~!SIH'J!~l<eN!rQHeg'I\1!Ifi~m§ffi,ª~º$e:''''''
4/27/2004 1414-1520 3,554 See attachments See attachments
4/27/2004 1414-1620 387
TOTAL
3,941
~Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mef
';;,;,;·;.!¡)~m§nrrnrrFrrrrn:;¡¡¡¡¡¡@!!l\1!e;HW.rrnYF;·F'FY';'&,:QgºM§¡¡;rr'';R!1?§§~f1f!~'J!I~:ti!:¡Q§W!!SI.,ª!!¡)eti!m;~·;,ª~,ª§§iFF;'F'" . ··F'F·FH~~rl~ti!¡m~l<eNrrmQ¡¡egIMIfi~m§W,ª~º§.e··
4/9/2004 0035-0111 400 See attachments See attachments
4/9/2004 1305-1314 30
4/9/2004 1447-1451 30
4/10/2004 0020-0056 400
4/11/2004 0027-0059 430
4/11/2004 0338-0343 20
4/11/2004 0354-0400 10
4/11/2004 1716-1722 30
4/11/2004 1906-1956 30
4/12/2004 0033-0113 400
4/12/2004 0805-0816 30
4/26/2004 0332-0400 510
4/26/2004 0337-0352 387
TOTAL
2,707
5/11/2004
1 :28 PM
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
April 2004
Page 2
Planned Events Exceeding 1 Hour OR Exceedin 5000 Mcf
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
14,614
3,941
2,707
o
TOTAL FLARED VOLUME
102,833
5/11/2004
1:28 PM
STATE OF ALASKA
ALASKA Oil AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000008
2. Facility Name
PBU CCF B
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator
5. MonthlYear of Disposition
BP Ma -2004
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
2,689,442
Pool Name
Pool Code
640150
Percent
100.00%
7. Reinjected
9,768,246
PRUDHOE
8. Flared or vented 1 hour or less
430
9. Flared or vented more than 1 hour (see instr.)
o
10. Pilot and Purge
25,600
11. Used for lease operations (specify in Remarks)
3,372,368
12. Other (see instructions)
o
Authorization> 1 hr:
Safety
MCF
13. TOTAL VOLUME (ITEMS 6-12)
15,856,086 \
Lease Use
MCF
14. NGL Gas Equivalent
2,689,442 '
Conservation
MCF
15. Purchased gas
o
Waste:
MCF
16. Transferred from: CCP
19,558,997
17. Transferred to: (Express as a negative #) FS1, FS2, FS3
-1,620,591
Commissioner
Date
18. Remarks: Block 11: Fuel Gas = 3,322,975 mscf and Assist Gas = 49,393 mscf
I h,rnby ,,,,. fu" fu, ""'.'0''' tho "'" 01 my ,,,,,,,,dgo
Signature Q (1, JJ..
Title
Date
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authorit 20 AAC25.235.
Printed Name
Robert A. Re nolds
Phone (907)564-5028
Form 10-422 Rev. 1/2004
Submit in Duplicate
...... '
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
May 2004
Page 1
lunplanned Events less than or equal to 1 hour
.... ..DATi: .... ..... 'TlI\iIE; ....... '>VOLUMEDE~RIPTIOJ\¡OFINCJQi:NT&CAI)SE . .
5/17/2004 1411-1421 430 Not required for unplanned events which
are less than or equal to 1 hour
. . . ACTION TAKEN TO ELII\iIINATECAI)~E .
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
430
lunplanned Events greater than 1 hour
D~TE ,.... . . ··TlI\iIE '. VOLUI\iIE; , '. ..DE~CfUPTION()F INCIDENT & C~I)SE
See attachments
'. ACTI()N TAKEN TO ELIMINA T¡:CAUSE . .
See attachments
TOTAL
o
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
· DATE < . . . . . TIME . 'VOLUMEDESCRI'f'TION OF INCIDENT & CAUSE .,. . .... . ...... ACTION TAKEN TO ELIMINATE CAUSE .
See attachments See attachments
TOTAL
o
See attachments
See attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
o
o
o
TOTAL FLARED VOLUME
75,423
6/4/2004
10:07 AM
..
STATE OF ALASKA
ALASKA Oil AND GAS CONSERVATION COMMISSION
FACiliTY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000008
2. Facility Name
PBU CCF B
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator 5. MonthlYear of Disposition
BP June-2004
20. For production from multiple pools. list contribution of each pool as a percent of
Total Volume.
6. Sold
2,247,479
7. Reinjected
7,673,121
Pool Name
PRUDHOE
Pool Code
640150
Percent
100.00%
8. Flared or vented 1 hour or less
15,948
9. Flared or vented more than 1 hour (see instr.)
15,517
10. Pilot and Purge
24,743
11. Used for lease operations (specify in Remarks)
2,877,999
12. Other (see instructions)
o
S8P-
13. TOTAL VOLUME (ITEMS 6-12)
12,854,807
Lease Use
14. NGL Gas Equivalent
2,247,479
15. Purchased gas
o
Waste:
MCF
16. Transferred from: CCP
16,065,847
17. Transferred to: (Express as a negative #) FS1, FS2, FS3
-1 ,488,587
18. Remarks: Block 11: Fuel Gas = 2,826,420 mscf and Assist Gas = 51,579 mscf
I hereby certify that the foregoin
Signature Q . 0 .
Title
Date
Note: All volumes must be
corrected to pressure of 14.65 pSia
and to a temperature of 600 F.
Authorit 20 AAC25.235.
Printed Name
Robert A. Re nolds
Phone (907}564-5028
Form 10-422 Rev. 1/2004
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
June 2004
1.~·¡~·r~:~~:~··:~:~~~':::'~~~~~~V~1~~¡~~ ~·~;~~~!ffl1Iº~'º~§I~çl~$.~;r·~'~\º$g¡¡.·,""""'"
······¡\ç¡JIºJ\I';r~$I\I]º·g""M!N\¡J$Ç\º~$····
6/9/2004 2054-2124 10 Not required for unplanned events which Not required for unplanned events which
6/11/2004 0547-0614 328 are less than or equal to 1 hour are less than or equal to 1 hour
6/17/2004 1415-1424 328
6/17/2004 1600-1615 387
6/17/2004 1601-1630 4,109
6/17/2004 1845-1930 9,496
6/17/2004 1845-1900 387
6/21/2004 0417-0422 3
6/21/2004 0441-0445 3
TOTAL 15,051
Page 1
lunplanned Events greater than 1 hour
'º~Tr;,·'·'···TIM!õ:'·'·············¡¡'····¥QI.lºM!õ:····· ·····QJ;:$~alf!t'QI\tQF·II\IºIQ¡;J\lT·~~~Q$¡;;···
6/11/2004 0547-0808 5,840 See attachments
6/17/2004 1355-1600 570
6/18/2004 1636-1750 8,677
........... .1
.. ..... ..... ACTION TAKEN. TO ELlMINAt¡;CAUSE' ....
See attachments
TOTAL
15,087
~Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Met
·PA]g··············]!MIæ'.···················.¥Q!ltJM.IË.······gIËSÇRII:!¡JIQti.QFI(\/CIPIËti¡J&.CAUSIË . . . . .. .. .··.ACTIQtiTA~EN¡JQIËIlIN1INATECAIJSE
6/5/2004 0154-0204 510 See attachments See attachments
6/9/2004 0108-0122 387
TOTAL
897
~Planned Events Exceeding 1 Hour OR Exceeding 5000 Met
¡'.' ,DATg ¡. ...... ... II""E ", .......> ¥qI,.UME .··..J;)ESCI¡UpTlON()FINCIDENT~CA1JSr;:. ...... ...... ¡.·A:ÇTIO~TA~ENTOEUMINATECAUSE .' .
6/9/2004 0224-0358 430 See attachments See attachments
TOTAL
Unplanned Events <: 1 Hour
Unplanned Events> 1 Hour
Planned Events <: 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
430
15,051
15,087
897
430
107,787
7/8/2004
10:00 AM
REPORT NO: 04-0208
SPXA FLARE REPORT
PRUDHOE SAY
FACILITY: CGF
DATE: 05 Jun 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 01 :54 02:04 0 Hrs 10 Mins 0 0 ~ 510 MSCF
TOTAL VOLUME
510 MSCF
First Determination of Cause:
1. TIC 1801 & TIC 1802: SESD & BESD.
Booster 1 & 2 Shutdown for maint.
Action Taken to Stop Flaring:
1. Blowdown complete.
Friday, June 18, 2004
Page 1 of 1
REPORT NO: 04-0215
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF
DATE: 09 Jun 2004
SYSTEM
1. Controlled Blowdow
2. Controlled Blowdow
3. FlarelRelief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
01:08 01:22 o Hrs 14 Mins 0 0 ~ 387 MSCF
02:24 03:58 1 Hrs 34 Mins ~ 0 ~ 430 MSCF
20:54 21:24 OHrs 30 Mins 0 ~ 0 10 MSCF
TOTAL VOLUME 827 MSCF
First Determination of Cause:
1. MI # 2 TIC 1855 SID For Maint. Compressor BESD on shutdown.
Meter 618
2. Part of L TS #2 depressured for maint on flare valves.
Meter 618
3. 51 P5001 SV NGL Recycle Pump 1504 Discharge. Relived to BPD
Due to possible incorrect setting on PSV,
Approximately Ten barrels of NGL Liquids.
Meter 619
Action Taken to Stop Flaring:
1, Depressure Complete.
2. Depressure completed.
3. 100% Assist Gas was open at the first sign of smoke.
PSV was removed from service.
Friday, June 18, 2004
Page 1 of 1
REPORT NO: 04-0218
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF
DATE: 11 Jun 2004
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
05:47 06:14 OHrs 27 Mins 0 0 0 328 MSCF
05:47 08:08 2Hrs 21 Mins 0 0 0 5,840 MSCF
TOTAL VOLUME 6,168 MSCF
First Determination of Cause:
1. shutdown 1855 due to a hydraulic line failure. (MTR 618)
2. MI1855 was shutdown due to a hydraulic line failure.
Action Taken to Stop Flaring:
1. Completed Depressure.
2. Plant process was adjusted to compinsate for the loss of 1855 compressor. ( MTR 660)
Friday, June 18, 2004
Page 1 of 1
REPORT NO: 04-0225
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF DATE: 17 Jun 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 13:55 16:00 2Hrs 5Mins 0 0 0 570 MSCF
2. FlarelRelief Valve 14:15 14:24 OHrs 9Mins 0 0 0 328 MSCF
3. Controlled Blowdow 16:00 16:15 OHrs 15 Mins 0 0 0 387 MSCF
4. Flare/Relief Valve 16:01 16:30 OHrs 29 Mins 0 0 0 4,109 MSCF
5. FlarelRelief Valve 18:45 19:30 OHrs 45 Mins 0 0 0 9,496 MSCF
6. Controlled Blowdow 18:45 19:00 OHrs 15 Mins 0 0 0 387 MSCF
TOTAL VOLUME 15,277 MSCF
First Determination of Cause:
1. 1884 Turbine SD due 3 times due to to underspeed caused by high ambient temperature. Flared
total of 15 minutes as it depressured each time
2. 1855 MI Compressor SD while trying to take it to idle, due to high ambient conditions.
3. T/C-1805 s/d- instrumentation problem
Mtr# 618
4. 1854 MI Compressor SO, unknown reason, probably ambient temp related.
5. T/C-1855 s/d- instrumentation problem- resutinging Stabilizer tower overpressure.
Mtr.#660
6. T/C-1855 s/d- instrumentation problem- F&G panel troubleshoot resulted in a unit trip
Mtr.# 618
Action Taken to Stop Flaring:
1. Restarted Turbine 3 times
2. Let it blowdown, no action taken
3. Unit depressured
4. Restarted 1855 compressor
Friday, June 18, 2004
Page 1 of 2
bp
REPORT NO: 04-0225
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF
DATE: 17 Jun 2004
~ ß Took measures to decrease MI make- Opened plant by-passes, heated L TS btms. Ultimately
restarted unit.
b Á Unit depressured
Friday, June 18, 2004
Page 2 of 2
REPORT NO: 04-0233
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF
DATE: 18 Jun 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 16:36 17:50 1 Hrs 14Mins D 0 0 8,677 MSCF
TOTAL VOLUME 8,677 MSCF
First Determination of Cause:
1. 1805 M 11 SO on a recycle trip while loading the Booster Compressors
Action Taken to Stop Flaring:
1. Restarted 1805 compressor
Thursday, July 01, 2004
Page 1 of 1
GPB Flaring Incidents
To:
Steve McMains, AOGCC
steve mcmains@admin.state.ak.us
907-793-1241, fax 907-276-7542
From:
Hal Tucker, GPB Prod Optim Team Leader,
907-659-4472
Several extended flare events occurred in the past few
weeks at GPB. This is a note giving you a courtesy "heads up" on the
greater than one hour flare events you will be seeing in the monthly gas
disposition reports prepared by the Anchorage Volume Accounting Team.
* GC3 experienced three flare events on June 24, 25 and 26 due to
K5500 shutting down on high lube oil temperature. Temperature probes,
RTD's and switches were changed out during the three days in attempts to
eliminate that root cause of the shut downs. K5500 procedures were
followed to minimize flaring. Total volume for the three events was
1,261 MSCF, total duration for the three events was 7 hours and 17
minutes.
* FS1 experienced one extended flare event beginning at 10:00 June
17 and ending at 02:45 June 18 when the 1801 STV/IP compressor shut down
due to high ambients. Several attempts were made to restart and reload
the machine. Total flare volume for the event was 8,491 MSCF over 16
hours and 45 minutes.
* GC2 experienced two flare events on May 30 and 31 due to PLC
malfunction in the produced water section of the plant. The production
cuts resulting from the water section upset caused the skid 18, IP and
LP compressors to surge intermittently due to the low GC oil rate. The
compressors loaded up as GC2 oil rates returned to normal. Total volume
for the two events was 920 MSCF, total duration was 5 hours and 31
minutes.
* ~experienced two flare events on June 17 and 18. The first
event occurred when the 1884 tandem shut down 3 times due to high
ambient temperatures over a 2 hour period. Each shut down resulted in 15
minutes of flaring. This event should have been captured as three
separate flaring events and should not be considered as a greater than
one hour event. The second event occurred when the 1805 MI compressor
shut down a recycle trip while loading the boosters. Flaring stopped
when 1805 was restarted. Total duration for the 1805 event was 1 hour
and 14 minutes, total volume was 8,677 MSCF.
* LPC experienced one flare event on June 17 when the 1808 gas
reinjection turbine shut down. Flaring stopped when 1808 was restarted.
I oaf2
6/28/20047:02 AM
GPB Flaring Incidents
~Gas was cut during the event to reduce flare volume. Total duration for
the event was 1 hour and 16 minutes, total volume was 5,804 MSCF.
* FS3 experienced two flare events on June 17 and June 20. The
first event occurred when the 1801 STV/IP compressor shut down due to
high ambients and plant upsets. After three failed restart attempts, the
spare machine (1802) was started, ending the flare event. Total duration
for this event was 1 hour and 10 minutes, total volume was 466 MSCF. The
second event occurred when the 1806 gas lift machine shut down due to
instrumentation problems. 1806 was secured and depressured, ending the
flare event. Total duration of the event was 6 hours of intermittent
flaring totaling 685 MSCF.
If you require additional information, please do not
hesitate to call me.
Hal Tucker
GPB Production Optimization TL
20,[2
6/28/20047:02 AM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000008
3. Field
PBU - EOA
Volume MCF
2,132,463
6,849,175
11,670
26,081 /
25,467
2,744,623
----Õ/
11,789,479
2,132,463 I
0
14,838,597
-1,252,178
6. Sold
7. Reinjected
8. Flared or vented 1 hour or less
9. Flared or vented more than 1 hour (see instr.)
10. Pilot and Purge
11. Used for lease operations (specify in Remarks)
12, Other (see instructions)
13. TOTAL VOLUME (ITEMS 6-12)
14. NGL Gas Equivalent
15. Purchased gas
16. Transferred from: CCP
17. Transferred to: (Express as a negative #) FS1, FS2, FS3
18. Remarks: Block 11: Fuel Gas = 2,692,702 mscf and Assist Gas = 51,921 mscf
I hereby certify that the foregoin is true and correct to the best of my knowledge.
Signature
Title
4. Operator
5. Month/Year of Disposition
BP Jul -2004
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
Pool Name
PRUDHOE
Pool Code
640150
Percent
100.00%
.5i:L-
Printed Name
Robert A. Re nolds
Phone (907}564-5028
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authorit 20 AAC25.235.
Form 10-422 Rev. 1/2004
Date
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
July 2004
¡Unplanned Events less than or e9ual to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT" CAUSE
7/9/2004 2232-2248 387 Not required for unplanned events which
7/9/2004 2232-2248 263 are less than or equal to 1 hour
7/9/2004 2254-2312 387
7/9/2004 2254-2354 789
7/11/2004 1224-1253 32
7/11/2004 2145-2205 350
7/13/2004 0007-0022 400
7/19/2004 2010-2020 774
Page 1
TOTAL
3,382
¡unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT" CAUSE
7/19/2004 2010-2202 26,081 See attachments
TOTAL
26,081
¡Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT" CAUSE
7/10/2004 0143-0155 430 See attachments
7/10/2004 0315-0335 350
7/10/2004 0425-0440 430
7/10/2004 0553-0605 430
7/10/2004 0830-0930 2,850
7/10/2004 0900-0915 328
7/10/2004 1240-1258 430
7/11/2004 0200-0300 2,850
7/13/2004 1440-1452 190
TOTAL
8,288
¡Planned Events Exceedin~ 1 Hour OR Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT" CAUSE
See attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
26,081
8,288
o
115,139
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
8/9/2004
9:53 AM
REPORT NO: 04-0283
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF DATE: 10 Jul2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. FlarelRelief Valve 01:43 01:55 OHrs 12 Mins 0 0 ~ 430 MSCF
2. Flare/Relief Valve 03:15 03:35 OHrs 20 Mins 0 0 ~ 350 MSCF
3. Flare/Relief Valve 04:25 04:40 OHrs 15 Mins 0 0 ~ 430 MSCF
4. FlarelRelief Valve 05:53 06:05 o Hrs 12 Mins 0 0 ~ 430 MSCF
5. Flare/Relief Valve 08:30 09:30 1 Hrs OMins 0 0 ~ 2,850 MSCF
6. Flare/Relief Valve 09:00 09:15 o Hrs 15 Mins 0 0 ~ 328 MSCF
7. Flare/Relief Valve 12:40 12:58 OHrs 18 Mins 0 0 ~ 430 MSCF
TOTAL VOLUME 5,248 MSCF
First Determination of Cause:
1. 1886 tandem was shutdown due to TAPS slowdown.
2. 1857 Booster was shutdown for maintenance during TAPS slowdown.
3. 1884 tandem was shutdown due to TAPS slowdown.
4. 1883 tandem was shutdown due to taps slowdown
5. Tandem station vented for maintenance.
6. 1805 was shutdown for power supply replacement
7. 1885 tandem was shutdown for maintenance during TPAS slowdown.
Action Taken to Stop Flaring:
1. TIC completed depresurization. MTR 618
2. TIC completed venting MTR618
3. TIC completed venting MTR618
4. TIC completed venting MTR618
Wednesday, July 28,2004
Page 1 of 2
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF
DATE: 10 Jul 2004
~ ~Completed venting MTR618
b ,;e:- Unit completed venting to 180psi. MTR618
7 ~T/C completed depressurization. MTR 618
Wednesday, July 28,2004
REPORT NO: 04-0283
Page 2 of 2
REPORT NO: 04-0286
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF DATE: 11 Jul 2004
TIME OF FLARING
SYSTEM Start Stop Duration Intermittent
1. FlarelRelief Valve 02:00 03:00 1 Hrs 0 Mins 0
2. Flare/Relief Valve 12:24 12:53 0 Hrs 29 Mins 0
3. FlarelRelief Valve 21 :45 22:05 0 Hrs 20 Mins 0
Black
Smoke Planned VOLUME
0 ~ 2,850 MSCF
0 0 32 MSCF
0 0 350 MSCF
TOTAL VOLUME 3,232 MSCF
First Determination of Cause:
1. Depressured the Tandem station piping to repair a leak.
2. Vented to reduce high plant feed pressure. Due to CCP TIC problems
3. 1857 tripped during startup.
Action Taken to Stop Flaring:
1. completed venting. MTR618
2. Reduced inlet pressure while CCP and the field settled out. MTR664
3. Completed venting MTR618
Wednesday, July 28,2004
Page 1 of 1
REPORT NO: 04-0289
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF
DATE: 13 Jul 2004
SYSTEM
1. Flare/Relief Valve
2. FlarelRelief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
00:07 00:22 OHrs 15 Mins 0 0 0 400 MSCF
14:40 14:52 OHrs 12 Mins 0 0 ~ 190 MSCF
TOTAL VOLUME 590 MSCF
First Determination of Cause:
1. 1883 Tripped due to a loose wire that indicates fuel gas HHH suction drum level. (Type "B"
shutdown>
2. 1886 Shutdown for maintenance. (Typa "A" shutdown>
Action Taken to Stop Flaring:
1. Completed venting. MTR 618
2. Completed venting. MTR 618
Wednesday, July 28, 2004
Page 1 of 1
bp
REPORT NO: 04-0303
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF
DATE: 19 Jul 2004
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
20:10 20:20 OHrs 10Mins ~ 0 0 774 MSCF
20:10 22:02 1 Hrs 52 Mins ~ 0 D 26,081 MSCF
TOTAL VOLUME 26,855 MSCF
First Determination of Cause:
1. Both MI machines depressured indicated by meter# 618.
2. Both MI machines tripped while attempting to pressurize the EOA MI header. Meter 660
Action Taken to Stop Flaring:
1. Depressure completed.
2. Warmed Us bottom temps. to minimize flaring and restarted both compressors.
Wednesday, July 28,2004
Page 1 of 1
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000008
2. Facility Name
PBU CCF B
Disposition
3. Field
PBU - EOA
Volume MCF
6. Sold
1,817,647
7. Reinjected
7,585,306
8. Flared or vented 1 hour or less
1,754
9. Flared or vented more than 1 hour (see instr.)
21,125
10. Pilot and Purge
25,523
11. Used for lease operations (specify in Remarks)
2,877,268
12. Other (see instructions)
1 ,573,605
13. TOTAL VOLUME (ITEMS 6-12)
13,902,228
14. NGL Gas Equivalent
1,817,647
15. Purchased gas
o
16. Transferred from: CCP
15,380,164
17. Transferred to: (Express as a negative #) FS1, FS2, FS3
-1,477,936
18. Remarks: Block 11: Fuel Gas = 2,825,045 mscf and Assist Gas = 52,223 mscf; Block 12: MI Gas to PI. McIntyre = 1,573,605 mscf
I hereby certify that the foregoin is true and correct to the best of my knowledge.
Signature
Title
Printed Name
Robert A. Re nolds
Phone (907)564-5028
Form 10-422 Rev. 1/2004
4. Operator
5. Month/Year of Disposition
BP Au ust-2004
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
Pool Name
PRUDHOE
Pool Code
640150
Percent
100.00%
Authorization> 1 hr:
Safety
MCF
(11Z6 j""&z-
MCF
MCF
MCF
Date
Lease Use
Waste:
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authorit 20 AAC25.235.
Date
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT· CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
August 2004
Page 1
IUnplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT 8. CAUSE
8/14/2004 1655-1708 190 Not required for unplanned events which
8/17/2004 1418-1419 21 are less than or equal to 1 hour
8/17/2004 2052-2100 83
8/22/2004 11 30-1140 7
TOTAL
301
lunplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT 8. CAUSE
8/16/2004 1108-1637 21,125 See attachments
TOTAL
21,125
~Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT 8. CAUSE
8/16/2004 0030-0040 420 See attachments
8/16/2004 0430-0435 135
8/16/2004 0010-0016 328
8/16/2004 0350-0358 390
8/16/2004 0740-0752 80
8/16/2004 0912-0918 100
TOTAL
1 ,453
~Planned Events Exceeding 1 Hour OR Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT 8. CAUSE
See attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
301
21,125
1,453
o
TOTAL FLARED VOLUME
100,625
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
9/10/2004
11:21 AM
REPORT NO: 04-0353
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF
DATE: 16 Aug 2004
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
00:30 00:40 o Hrs 10 Mins 0 0 ~ 420 MSCF
04:30 04:35 OHrs 5Mins 0 0 ~ 135 MSCF
TOTAL VOLUME 555 MSCF
First Determination of Cause:
1. Shutdown TIC 1876 for scheduled maintenance
2. Shutdown T/C 1808 for scheduled maintenance
Action Taken to Stop Flaring:
1. Depressured T /C 1876
2. Depressured T/C 1808
VVednesday, August 25, 2004
Page 1 of 1
REPORT NO: 04-0355
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF DATE: 16 Aug 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 00:10 00:16 OHrs 6Mins 0 0 ~ 328 MSCF
2. FlarelRelief Valve 03:50 03:58 OHrs 8Mins 0 0 ~ 390 MSCF
3. Flare/Relief Valve 07:40 07:52 OHrs 12 Mins 0 0 ~ 80 MSCF
4. Flare/Relief Valve 09:12 09:18 OHrs 6Mins 0 0 ~ 100 MSCF
5. Flare/Relief Valve 11:08 16:37 5Hrs 29 Mins 0 0 0 21,125 MSCF
TOTAL VOLUME 22,023 MSCF
First Determination of Cause:
1. SO MI1 for maintenance
2. 1801 1802 Booster Comp SO
3. Flaring to get DP for F221 perimeter valve test
4. Flaring to get DP for F301 ,F302 perimeter valve test
5. 1855 MI Comp SO due to process upset
Action Taken to Stop Flaring:
1. Allowed compressor to blow down
2. Let compressors blow down
3. Completed test, closed flare valve
4. Completed test, closed flare valve
5. Took corrective action to get stabilizer section stable, started 1805 MI compressor when it became
available.
VVednesday, August 25, 2004
Page 1 of 1
·
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000008
2. Facility Name
PBU CGF B
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator 5. MonthNear of Disposition
BP Se tember-2004
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
2,182,901
7. Reinjected
9,564,082
Pool Name
PRUDHOE
Pool Code
640150
Percent
100,00%
8. Flared or vented 1 hour or less
4,090
9. Flared or vented more than 1 hour (see instr.)
27,371
10. Pilot and Purge
24,701
11. Used for lease operations (specify in Remarks)
3,098,741
12. Other (see instructions)
o
f2-
13. TOTAL VOLUME (ITEMS 6-12)
14,901,886
MCF
14. NGL Gas Equivalent
2,182,901
MCF
15. Purchased gas
o
16. Transferred from: CCP
17,594,515
17. Transferred to: (Express as a negative #) FS1, FS2. FS3 and GPMA PI. Mcintyre
MI
18. Remarks: Block 11: Fuel Gas = 3,047,845 mscf and Assist Gas = 50,896 mscf; Block 17: Includes MI Gas to PI. McIntyre = 1,233,724 mscf
-2,692,629
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature A ~ h..~
Title Mana er, State Taxes and Ro alt
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authorit 20 AAC25.235.
Printed Name
Robert A. Re nolds
Phone (907)564-5028
Form 10-422 Rev. 1/2004
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
September 2004
Page 1
IUnplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
9/6/2004 1605-1617 400 Not required for unplanned events which
9/11/2004 1100-1110 387 are less than or equal to 1 hour
9/14/2004 1600-1610 774
9/14/2004 1858-1908 387
9/14/2004 1951-2005 387
9/14/2004 2124-2134 387
9/14/2004 2209-2220 387
9/14/2004 2248-2258 328
9/14/2004 2352-2356 100
9/15/2004 0053-0112 328
9/15/2004 1328-1345 144
9/30/2004 1858-1940 15
9/30/2004 1949-2002 7
TOTAL 4,031
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
lunplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
9/11/2004 1100-1335 12,256 See attachments
9/14/2004 1600-1912 14,787
TOTAL
27,043
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Met
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
9/30/2004 1031-1051 59 See attachments
TOTAL
59
Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Met
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
9/30/2004 0901-1014 328 See attachments
TOTAL
328
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
4,031
27,043
59
328
TOTAL FLARED VOLUME
107.058
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
1 0/6/2004
10:54 AM
REPORT NO: 04-0423
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF
DATE: 11 Sep 2004
SYSTEM
TIME OF FLARING
Start Stop Duration
Intermittent
Black
Smoke Planned VOLUME
0 0 -, 1\1SC~
0 0 387 MSCF
0 0 12,256 MSCF
TOTAL VOLUME 12,643 MSCF
:. .¡ '--~'':''.a!:-:.' _
oJ
~~ ~<~~; ~~~!ì~. 0
11:00 11 :10 OHrs 10 Mins D
11:00 13:35 2Hrs 35 Mins 0
'.-. Flare/Relief Valve
2. i flare/Relief Valve
First Determination of Cause:
1. MI # 1 Shutdown T/C-1805
Valve out of position caused compressor to B.E.S.D: Meter 618
2. MI # 1 Shutdown T/C-1805
Suction Valve out of position caused turbine to shutdown,
Turbine control logic prevented turbine from starting. Meter 660
Action Taken to Stop Flaring:
1. B.E.S.D depressue was completed.
2. Repaired F-12 A V suction valve position logic to indicate open and restarted turbine.
Monday, September 27, 2004
Page 1 of 1
REPORT NO: 04-0442
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF DATE: 14 Sep 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 16:00 19:12 3Hra 12.,.Ins ~ 0 0 14,787 MSCF
2. Flare/Relief Valve 16:00 16:10 OHrs 10 Mins ~ 0 0 774 MSCF
3. Flare/Relief Valve 18:58 19:08 OHrs 10 Mins ~ 0 0 387 MSCF
4. Flare/Relief Valve 19:51 20:05 OHrs 14 Mins ~ 0 D 387 MSCF
5. Flare/Relief Valve 21:24 21:34 OHrs 10 Mins ~ 0 0 387 MSCF
6. Flare/Relief Valve 22:09 22:20 OHrs 11 Mins ~ 0 0 387 MSCF
7. Flare/Relief Valve 22:48 22:58 OHrs 10 Mins ~ 0 0 328 MSCF
8. Flare/Relief Valve 23:52 23:56 OHrs 4Mins ~ 0 0 100 MSCF
TOT AL VOLUME 17,537 MSCF
First Determination of Cause:
1. Stabilizer upset due to power blip. Both MI trains tripped off line.
2. MI trains 1 &2 shutdown due to power blip. Both units depressured to flare.
3. Unsuccesful start attempt to MI compressor train 1855.
4. Unsuccesful start attempt to MI compressor train 1855.
5. Unsuccesful start attempt to MI compressor train 1855.
6. Unsuccesful start attempt to MI compressor train 1855.
7. Unsuccesful start attempt to MI compressor train 1855.
8. Intermittant flaring from stabilizers due to plant upset.
Action Taken to Stop Flaring:
1. Volume indicated by meter 660.
2. Blowdowns completed. Estimated volume indicated by meter 618.
Monday, September 27, 2004
Page 1 of 2
REPORT NO: 04-0442
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF
DATE: 14 Sep 2004
~ 'Kí. Blowdown completed. Estimated volume indicated by meter 618.
'I H. Blowdown completed. Estimated volume indicated by meter 618.
;; 1Z. Blowdown completed. Estimated volume indicated by meter 618.
6 1<f Blowdown completed. Estimated volume indicated by meter 618.
I )4. Blowdown completed. Estimated volume indicated by meter 618.
g 1-5. Restarting MI trains and adjusting L TS trains to minimize flare. Volume indicated by meter 660.
Monday, September 27, 2004
Page 2 of 2
REPORT NO: 04-0475
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF DATE: 30 Sep 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 09:01 10:14 1 Hrs 13Mins 0 0 ~ 328 MSCF
2. Flare/Relief Valve 10:31 10:51 OHrs 20 Mins 0 0 ~ 59 MSCF
3. Flare/Relief Valve 18:58 19:40 OHrs 42 Mins ~ 0 0 15 MSCF
4. Flare/Relief Valve 19:49 20:02 OHrs 13 Mins ~ 0 0 7 MSCF
TOTAL VOLUME 409 MSCF
First Determination of Cause:
1. Type B Shutdown (328 MM)
Depressured for water wash (MTR 618)
2. Type C Shutdown (59MM)
Depressured for water wash (Mtr 618)
3. Excessive pressure while loading MI-1. (Mtr 660)
4. Excessive pressure while loading MI-1. (Mtr 660)
Action Taken to Stop Flaring:
1. Oepressure completed
2. Depressure completed
3. Closed recycles.
4. Closed recycles.
Monday, October 04, 2004
Page 1 of 1
STATE OF ALASKA
ALASKA Oil AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000008
2. Facility Name
PBU CGF B
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator 5. Month/Year of Disposition
BP October-2004
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
2,604,823
Pool Name
Pool Code
640150
Percent
100.00%
7. Reinjected
11,281,581
PRUDHOE
8. Flared or vented 1 hour or less
1,116
9. Flared or vented more than 1 hour (see instr.)
328
10. Pilot and Purge
25,761
11. Used for lease operations (specify in Remarks)
3,272,378
12. Other (see instructions)
o
MCF
13. TOTAL VOLUME (ITEMS 6-12)
17,185,987
14. NGL Gas Equivalent
2,604,823
MCF
15. Purchased gas
o
Waste:
16. Transferred from: FS1, FS2, FS3, GC1, GC2, GC3
242,747,188
17. Transferred to: (Express as a negative #) FS1, FS2, FS3. CCP & GPMA Pt.
Mcintyre MI
18. Remarks: Block 11: Fuel Gas = 3,219,992 msef and Assist Gas = 52,386 msef; Block 17: Includes MI Gas to Pt. McIntyre = 1,104,525 msef
-225,561,203
I "":,::::: "ït;'rc=" ¡::""
Printed Name
Bernard W. Ha'n
Phone (907)564-5028
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authorit 20 AAC25.235.
Title Mana er, Production Taxes and Ro alt
Form 10-422 Rev. 1/2004
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
October 2004
Page 1
Unplanned Events less than or equal to 1 hour
10/14/2004
10/14/2004
0900-0915
0930-0945
208 Not required for unplanned events which
387 are less than or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
595
IUnPlann~dE~~nts greate,rtha~ 1 hour ,
OA,TE ",."" //, '~TlM,E;',,<, 'VOLtJ,Me.<De~CRIPTJOIIIOF~IIIÇIDeNT"PAU~IiL ' "', """>AÇTlOIIITAKeIllT()eLlMINATe:CAU~E' ",,"
See attachments See attachments
TOTAL
o
Planned Events Less Than or Equal 1 Hour AND Not Exceedin
10/4/2004
10/15/2004
10/15/2004
1637-1709
0005-0023
1100-1117
59 See attachments
430
32
See attachments
TOTAL
521
Iplanned Events Exceeding 1 Hour OR Exceedin~ 5000 Mcf
, "DATE ,.."",' ' ""TIME ',' ",'VO;.UME ,DESC~IPTIQNOFINCJQENT"CAtJSE< . .'. ",,' , " ,", ACTlQIIITAi<:eNT()ElIMINATECAtJSE,,' .'.' ,,'
10/4/2004 0933-1043 328 See attachments See attachments
TOTAL 328
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour 0
Planned Events < 1 hour and not 521
exceeding 5,000 MCF
Planned Events> 1 hour or 328
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME 79,591
11/9/2004
10:58 AM
REPORT NO: 04-0485
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF
DATE: 04 Oct 2004
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
09:33 10:43 1 Hrs 10 Mins 0 0 ~ 328 MSCF
16:37 17:09 OHrs 32 Mins 0 0 ~ 59 MSCF
TOTAL VOLUME 387 MSCF
First Determination of Cause:
1. Type B Shutdown (328 MM)
Depressured for water wash (MTR 618)
2. Type C Shutdown (59 MM)
Depressured for Water Wash (Mtr 618)
Action Taken to Stop Flaring:
1. Depressure completed
2. Depressure completed
Friday, October 22,2004
Page 1 of 1
bp
REPORT NO: 04-0502
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF
DATE: 15 Oct 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 00:05 00:23 0 Hrs 18 Mins 0 0 ~ 430 MSCF
TOTAL VOLUME
430 MSCF
First Determination of Cause:
1. SO TIC 1884 FOR MAl NT.
Action Taken to Stop Flaring:
1. COMPLETED BLOWDOWN OF TIC 1884
Friday, October 22, 2004
Page 1 of 1
REPORT NO: 04-0501
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF
DATE: 15 Oct 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/ReliefValve 11:00 11:17 OHrs 17Mins 0 0 ~ 32 MSCF
TOTAL VOLUME
32 MSCF
First Determination of Cause:
1. Flared while CCP put 1878 on LTS3 since our Tandem 2 is down for Major
Action Taken to Stop Flaring:
1. CCP completed swap
Friday, October 22, 2004
Page 1 of 1
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000008
2. Facility Name
PBU CGF B
Disposition
3. Field
PBU - EOA
Volume MCF
6. Sold
2,731,231
7. Reinjected
11,356,326
8. Flared or vented 1 hour or less
5,669
9. Flared or vented more than 1 hour (see instr.)
15,865
10. Pilot and Purge
25,130
11. Used for lease operations (specify in Remarks)
3,402,857
12. Other (see instructions)
o
13. TOTAL VOLUME (ITEMS 6-12)
17,537,078
14. NGL Gas Equivalent
2,731,231
15. Purchased gas
o
16. Transferred from: FS1, FS2, FS3, GC1, GC2, GC3
253,211,713
4. Operator 5. MonthlYear of Disposition
BP November-2004
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
Pool Name
PRUDHOE
Pool Code
640150
Percent
100.00%
:Jf3!'-
MCF
MCF
MCF
/-//,Ø
Date
-235,674,637
17. Transferred to: (Express as a negative #) FS1, FS2, FS3. CCP & GPMA PI.
Mcintyre MI
18. Remarks: Block 11: Fuel Gas = 3,356,866 roscf and Assist Gas = 45,991 roscf; Block 17: Includes MI Gas to Pt. Mcintyre = 1,012,083 roscf
Signature
Phone (907)564-5028
Title Mana er, Production Taxes and Ro alt
Date I J -/ -:-.¿¡I./
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authorit 20 AAC25.235.
I hereby certify that the foregoing is true and c
e best of my knowledge.
Printed Name
Form 10-422 Rev. 1/2004
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
November 2004
Page 1
IUnplanned Events less than or equal to 1 hour
.. . . · . DATE· . . . . . . TIME . . · · .. .... VOLUME . · DESCRIPTION OF INCIDENT &. CAU~E . . . . . . . . . . . . ACTION TAKEN TO ELIMINATE CAUSE. . .
11/3/2004 0355-0410 390 Not required for unplanned events which Not required for unplanned events which
11/3/2004 0400-0420 774 are less than or equal to 1 hour are less than or equal to 1 hour
11/3/2004 0547-0555 195
11/3/2004 1037-1045 387
11/3/2004 1314-1320 387
11/3/2004 1040-1128 3,072
11/3/2004 1320-1408 64
11/7/2004 1210-1308 400
J
TOTAL
5,669
~Unplanned Events greater than 1 hour
DATE . . . . TIME· . . VOLUME DESCf:lIPTION OFINCIPENT&. CAUSE
11/3/2004 0355-0546 15,865 See attachments
..... ... ACTION TAKEN TO ELIMINATE CAUSE.
See attachments
TOTAL
15,865
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Met
DATE ... TIME VOLUME DESqRIPTION OF INCIDENT &. CAUSE
See attachments
........... ACTION TAKEN TO EUMINATECAUSE····
See attachments
TOTAL
o
Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Met
. DATE:> TIME . VOLUMEI)E~CRIPTIONOFINCIDENT&CAUSE
See attachments
Ac:TJON TAI<E:N TO E:LlMINATE CAUSE
See attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
15,865
o
o
TOTAL FLARED VOLUME
92.655
12/6/2004
4:06 PM
bp
REPORT NO: 04-0525
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: CGF.
DATE: 03 Nov 2004
SYSTEM
1. FlarelRelief Valve
2. FlarelRelief Valve
3. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
03:55 05:46 1 Hrs 51 Mins ~ 0 0 15,865 MSCF
10:40 11:28 OHrs 48 Mins ~ D D 3,072 MSCF
13:20 14:08 OHrs 48 Mins ~ D 0 64 MSCF
TOTAL VOLUME 19,001 MSCF
First Determination of Cause:
1. MI trains shutdown due to plant upset
2. MI train shutdown due to plant upset
3. MI train shutdown due to plant upset
Action Taken to Stop Flaring:
1. Restarted MI train and warmed up L TS. Volume indicated by meter 660
2. Restarted MI train. Volume indicated by meter 660
3. Restarted MI train. Volume indicated by meter 660
Monday, November 22, 2004
Page 1 of 1
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000008
2. Facility Name
PBU CGF B
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator 5. Month/Year of Disposition
BP Decembe~2004
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
2,698,464
Pool Name
PRUDHOE
Pool Code
640150
Percent
100.00%
7. Reinjected
13,348,094
8. Flared or vented 1 hour or less
1,082
9. Flared or vented more than 1 hour (see instr.)
o
10. Pilot and Purge
26,058
11. Used for lease operations (specify in Remarks)
3,560,250
12. Other (see instructions)
o
Authorization >1 hr:
Safety
MCF
13. TOTAL VOLUME (ITEMS 6-12)
19,633,948
Lease Use
MCF
14. NGL Gas Equivalent
2,698,464
Conservation
MCF
15. Purchased gas
o
Waste:
MCF
16. Transferred from: FS1, FS2, FS3, GC1, GC2, GC3
265,209,582
17. Transferred to: (Express as a negative #) FS1, FS2, FS3. CCP & GPMA PI.
Mcintyre MI
18. Remarks: Block 11: Fuel Gas = 3,515,087 mscf and Assist Gas = 45,163 mscf; Block 17: Includes MI Gas to PI. McIntyre = 802,656 mscf
-245,575,634
Commissioner
Date
Printed Name
Phone (907)564-5028
Date
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authorit 20 AAC25.235.
Form 10-422 Rev. 1/2004
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
December 2004
Unplanned Events less than or equal to 1 hour
12/13/2004
12/15/2004
12/15/2004
12/15/2004
12/31/2004
0138-0219
0405-0410
1 023-1 028
2245-2250
1641-1704
TOTAL
1,082
97 Not required for unplanned events which
195 are less than or equal to 1 hour
195
195
400
Page 1
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
See attachments
o
See attachments
Planned Events Less Than or Equal 1 Hour AND Not Exceedin
TOTAL
See attachments
o
See attachments
Planned Events Exceeding 1 Hour OR Exceedin
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
72,303
See attachments
o
o
o
o
See attachments
1/10/2005