STATE OF ALASKA
AOGCC
GAS DISPOSITION FILES
YEAR: 2004
FACILITY: PBU FS 3
OPERATOR: BP EXPLORATION
Disposition Volume MCF"
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 64
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 47,662
6. Used for lease operations Fuel 1,043,746
Assist 690
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 1,092,162
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: CGF 1,091,408
11. Transferred to: CCP 35,357,571
Remarks:
I hereby cert{jhat the rre~ true and correct to the best of my knowledge.
Signature: .,Q Å 1.J. Title: SUPERVISOR
.
'"
Facility
FLOW STATION 3
Form 1 0-422 (Revised 4/95)
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 01/2004
"Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
..
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT· FS-3
GAS FLARING INCIDENT REPORT
January 2004
Page 1
1/7/2004
0308-0332
Unplanned Events less than or equal to 1 hour
TOTAL
64 Not required for unplanned events which
are less than or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
64
Unplanned Events greater than 1 hour
TOTAL
See attachments
See attachments
o
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
See attachments
TOTAL
See attachments
o
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
See attachments
See attachments
o
64
o
o
o
48.416
2/6/2004
10:43 AM
-'
Facility
FLOW STATION 3
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 02/2004
Disposition Volume MCF"
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 1,412
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 44,464
6. Used for lease operations Fuel 978,922
Assist 797
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 1,025,595
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: CGF 1,023,386
11. Transferred to: CCP 32,647,815
Remarks:
I hereby cen that thrOregOing;S true and correct to the best of my knowledge.
Signature: () ..Á .of ~ J.. Title: SUPERVISOR
Form 10-422 (Revised 4/95)
"Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS-3
GAS FLARING INCIDENT REPORT
February 2004
lunplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
2/20/2004 1540-1548 967 Not required for unplanned events which
2/25/2004 0614-0714 402 are less than or equal to 1 hour
Page 1
TOTAL
1,369
lunplanned Events greater than 1 hour
DATE TIME VOLUME
DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL
o
~Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
2/20/2004 1615-1620 40 See attachments
2/21/2004 1940-1945 3
TOTAL
43
Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
1,369
o
43
o
TOTAL FLARED VOLUME
46,673
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
3/5/2004
2:08 PM
REPORT NO: 04-0052
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 20 Feb 2004
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING
Start Stop Duration
15:4() 15:48 () Hrs
16:15 16:2() () Hrs
Black
Intermittent Smoke
8Mins D D
5Mins D D
Planned
D
~
VOLUME
967 MSCF
'<m' "MSCF
TOTAL VOLUME .:1..007 MSCF
First Determination of Cause:
1. 18()4 T/C shutdown on Seal Oil Overhead Tank HHLL due to instrumentation malfunction.
2. 18()4 T /C aborted start attempt.
Action Taken to Stop Flaring:
1. Commonlines 7C/15C shutdown.
2. Aborted Start. Normal shutdown.
Monday, February 23, 2004
Page 1 of 1
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 21 Feb 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke
1. Controlled Slowdow 19:4() 19:45 () Hrs 5 Mins D D
REPORT NO: 04-0055
Planned VOLUME
~ 3 MSCF
TOTAL VOLUME
'31J1SCF
First Determination of Cause:
1. Normal stop of 18()2.
Action Taken to Stop Flaring:
1. Normal stop, unit depressurized.
Monday, February 23, 2004
Page 1 of 1
,.
Facility
FLOW STATION 3
Disposition
1. Sold
2. Reinjected
3. Flared or vented less than 1 hour.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 03/2004
Volume MCF"
18
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
1,337
5. Pilot and Purge
6. Used for lease operations
7. Other
TOTAL items 1 - 7
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from: CGF
11. Transferred to: CCP
Remarks:
47,163
Fuel
Assist
1,026,878
13,432
Lift Gas, Off Field
1,088,828
1,074,041
34,987,463
is true and correct to the best of my knowledge.
Title: SUPERVISOR
"Indicate contribution of each pool to total.
o
Pool Name
Code
Percent
o
PRUDHOE
100.00%
640150
o
1 . Safety
" 33 7 MCF ð.ßr2-
o
2. Lease Use
MCF
o
MCF
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS-3
GAS FLARING INCIDENT REPORT
March 2004
IUnplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
Page 1
TOTAL
o
lunplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
3/2/2004 0800-0927 18 See attachments
TOTAL
18
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
3/2/2004 1430-1435 3 See attachments
3/19/2004 1700-1705 3
3/19/2004 1715-1720 3
3/19/2004 1740-1745 3
3/20/2004 1030-1035 3
3/20/2004 1745-1750 3
TOTAL
18
Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
3/5/2004 0130-0530 746 See attachments
3/6/2004 1045-1430 573
TOTAL
1,319
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
18
18
1,319
TOTAL FLARED VOLUME
61,950
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
4/8/2004
3:07 PM
REPORT NO: 04-0071
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 02 Mar 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke PlannedV01:UME
1. Flare/Relief Valve 08:00 09:27 1 Hrs 27Mins ~ D D ' ,..1KMSCF
2. Flare/Relief Valve 14:30 14:35 OHrs 5Mins D D ~ 3 MSCF
TOTAL VOLUME
21 MSCF
First Determination of Cause:
1. Starting 1802 compressore bad igniter
2. Shutdown 1801 for maintence
Action Taken to Stop Flaring:
1. Repaired igniter and brought unit on line
2. Depresured and secured unit
Tuesday, March 30, 2004
Page 1 of 1
REPORT NO: 04-0075
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 05 Mar 2004
SYSTEM
1. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke
01 :3() ()5:3() 4 Hrs () Mins D D
Planned VOLUME
~ ,.J'46_MSCF
TOTAL VOLUME
746 MSCF
First Determination of Cause:
1. 18()3 T /C shutdown for spring water wash and maintenance
Action Taken to Stop Flaring:
1. work completeted and equipment secured
Tuesday, March 30, 2004
Page 1 of 1
REPORT NO: 04-0077
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 06 Mar 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Controlled Blowdow 10:45 14:30 3Hrs 45Mins ~ D ~",5Z3"MSCF
TOTAL VOLUME
573 MSCF
First Determination of Cause:
1. Shutdown of1804 TIC for water wash and maintenance
Action Taken to Stop Flaring:
1. Completed work and,equjpments.ecured.
Tuesday, March 30, 2004
Page 1 of 1
REPORT NO: 04-0092
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3 DATE: 19 Mar 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 17:00 17:05 o Hrs 5Mins D D ~ 3,MSCF
2. Flare/Relief Valve 17:15 17:20 o Hrs 5Mins D D ~ 3 MSCF
3. Flare/Relief Valve 17:40 17:45 o Hrs 5Mins D D '~ '~ MSCF
TOTAL VOLUME 9 MSCF
First Determination of Cause:
1. 1802 T/C Aborted Start Attempt. Instrumentation malfunction.
2. 1802 T/C Aborted Start Attempt. Instrumentation malfunction.
3. 1802 T/C Normal Shutdown due to Mechanical malfunction.
Action Taken to Stop Flaring:
1. Normal shutdown without flaring in progress.
2. Normal shutdown without flaring in progress.
3. Normal shutdown without flaring in progress.
Tuesday, March 30, 2004
Page 1 of 1
'"
FACILITY: FS3
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
REPORT NO: 04-0093
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 20 Mar 2004
TIME OF FLARING
Start Stop Duration
1 G:3G 1 G:35 G Hrs
17:45 17:5G G Hrs
Black
Intermittent Smoke
5Mins D D
5Mins D D
Planned
~
~
TOTAL VOLUME
First Determination of Cause:
1. 18G1 T/C Normal shutdown to perform Gas Gen L.O. Pump repair.
2. 18G2 TIC Normal Shutdown from idle.
Action Taken to Stop Flaring:
1. Normal shutdown without flaring in progress.
2. Normal shutdown. Unit returned to standby mode.
Tuesday, March 30, 2004
VOLUME
".3.MSCF
3 MSCF
"6 MSCF
Page 1 of 1
to .
..
Facility
FLOW STATION 3
Disposition
1. Sold
2. Reinjected
3. Flared or vented less than 1 hour.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 04/2004
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge
6. Used for lease operations
7. Other
TOTAL items 1 - 7
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from: CGF
11. Transferred to: CCP
Remarks:
I hereby certif
Signature:
Form 10-422 (Revised 4/95)
Fuel
Assist
Lift Gas, Off Field
true and correct to the best of my knowledge.
Title: SUPERVISOR
Volume MCF*
4,306
486
36,625
976,180
5,601
1,023,198
1,012,805
33,182,928
"Indicate contribution of each pool to total.
o
Pool Name
Percent
Code
o
PRUDHOE
100.00%
640150
o
1. Safety
4£~ MCF ~P-
o
2. Lease Use
MCF
o
MCF
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS-3
GAS FLARING INCIDENT REPORT
April 2004
Page 1
lunplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
4/18/2004 1735-1820 2,156 Not required for unplanned events which
4/18/2004 1309-1321 1 ,612 are less than or equal to 1 hour
4/20/2004 1 039-1 049 538
TOTAL 4,306
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
lunplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
4/1/2004 0001-2359 64 See attachments
4/2/2004 0001-2359 197
4/28/2004 0000-2400 100
TOTAL
361
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL
o
Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
4/18/2004 1525-1645 125 See attachments
TOTAL
125
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
4,306
361
o
125
TOTAL FLARED VOLUME
47,018
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
5/11/2004
1 :32 PM
REPORT NO: 04-0101
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 01 Apr 2004
SYSTEM
1. Other
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke
OG:01 23:59 23 Hrs 58 Mins ~ D
Planned- V01.UME
n,64.MSCF
TOTAL VOLUME
64 MSCF
First Determination of Cause:
1. "C" Slug catcher P5GV- vent to flare found to be leaking through.
Action Taken to Stop Flaring:
1. Instrument Tech's repaired pressure controller and returned valve to normal service.
Sunday, April 25, 2004
Page 1 of 1
REPORT NO: 04-01 03
BPXA FLARE REPORT
PRUDHOE SAY
FACILITY: FS3
DATE: 02 Apr 2004
SYSTEM
1. Other
TIME OF FLARING Black
Start Stop Durationhîtermittent Smoke Planned 'VOLUME
GO:G,1 ,,_ 2359 23.Hrs58.Mins ~ D 0197 MSGF
TOTAL VOLUME
197 MSCF
First Determination of Cause:
1. exceeded flare volume due to adding Assist gas to STV Aux flare to prevent smoking.
Action Taken to Stop Flaring:
1. Returned Assist gas valve to closed position after fJaregas clearedup.
Sunday, April 25, 2004
Page 1 of 1
bp
REPORT NO: 04-0125
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 18 Apr 2004
TIME OF FLARING Black
SYSTEM Start Stop DUrâtión Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 15:25 16:45 1 Hrs20 Minsn D ~ 125 MSCF
TOTAL VOLUME
125 MSCF
First Determination of Cause:
1. DS14 BIC Commonline required shutdown and depressuring due to broken grease zerk on well 14-8
"C" divert valve.
Action Taken to Stop Flaring:
1. Completed depressuring. Repaired broken zerk. Returned DS14 B/C Commonline to service.
Sunday, April 25, 2004
Page 1 of 1
REPORT NO: 04-0147
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 28 Apr 2004
SYSTEM
1. Other
TIME OF FLARING Black
Start Stop "DUration Intermittent Smoke
n. GO:OO 24:0G 24Hrs GMins D D
Planned '>VOL.UME
o 100 MSGF
TOTAL VOLUME
1 GG MSCF
First Determination of Cause:
1. Adding flare Assist gas to keep STV Aux flare clear of smoke.
Action Taken to Stop Flaring:
1. Checked plant over to try and find source and reduced Assistgas after smoking cleared up.
Monday, May 03, 2004
Page 1 of 1
..
.-,Ì
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000030
2. Facility Name
PBU FS 3
Disposition
3, Field
PBU-EOA
Volume MCF
4. Operator 5. Month/Year of Disposition
BP Ma -2004
20. For production from multiple pools. list contribution of each pool as a percent of
Total Volume.
6. Sold
o
Pool Name
PRUDHOE
Pool Code
640150
7. Reinjected
o
8. Flared or vented 1 hour or less
396
9. Flared or vented more than 1 hour (see instL)
7,075
10. Pilot and Purge
39,816
11, Used for lease operations (specify in Remarks)
958,983
12. Other (see instructions)
o
13. TOTAL VOLUME (ITEMS 6-12)
1,006,270
14. NGL Gas Equivalent
o
15. Purchased gas
o
16. Transferred from: CGF
984,826
17. Transferred to: (Express as a negative #) CCP
-33,228,321
18. Remarks: Block II: Fuel Gas = 945,0 I 0 mscf and Assist Gas = 13,973 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Slg"I"~ Q. O. ~
Percent
100.00%
Title
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authorit 20 AAC25.235.
Printed Name
Robert A. Re nolds
Date
Submit in Duplicate
Phone (907)564-5028
Form 10-422 Rev. 1/2004
.~
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS-3
GAS FLARING INCIDENT REPORT
May 2004
Page 1
lunPlanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
5/22/2004 1307-1312 240 Not required for unplanned events which
5/30/2004 1600-1605 3 are less than or equal to 1 hour
5/30/2004 1640-1645 3
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
246
Unplanned Events reater than 1 hour
5/23/2004
5/25/2004
640 See attachments
548
See attachments
0001-2359
0001-2359
TOTAL
1,188
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
5/22/2004 1140-1150 75 See attachments
5/22/2004 1330-1340 75
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
TOTAL
150
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mef
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour 1,188
Planned Events < 1 hour and not 150
exceeding 5,000 MCF
Planned Events> 1 hour or 5,887
exceeding 5,000 MCF
Pilot Purge
Assist
5/4/2004
5/21/2004
5/21/2004
5/22/2004
5/22/2004
1710-2330
0905-1205
0905-1205
0001-2359
0750-0903
18 See attachments
1,777
1,885
1 ,443
764
See attachments
TOTAL 5,887
6/4/2004
10:08 AM
TOTAL FLARED VOLUME
61,260
REPORT NO: 04-0163
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 04 May 2004
TIME OF FLARING Black
SYSTEM Start $to,,·· ..Ðurat1øn,lAte,rmitteftt"Smoke Planned VOLUME
1. Controlled Blowdow 17:10 23:30 6Hrs 20Mins D D ~ 18 MSCF
TOTAL VOLUME
18 MSCF
First Determination of Cause:
1. Depressured the Artificial Lift Gas line toDS6& 13 for replacement ôf a leaking grease zert.
Action Taken to Stop Flaring:
1. Zert replaced and line secured.
Tuesday, May 25, 2004
Page 1 of 1
.
.
FACILITY: FS3
SYSTEM
1. Flare/Relief Valve
2. Other
REPORT NO: 04-0182
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 21 May 2004
TIME OF FLARING Black
ßt:art'Stop , Duration ' -Intermittent Smoke Planned VOLUME
G9:05 12:G5 3Hrs G Mins D D ~ 1,777 MSCF
09:05 12:G5 3Hrs GMins D D ~ 1 ,885 MSCF
,,:¡'-GTAL VOI.::,UME 3;662 MSCf
First Determination of Cause:
1. Flare volume was a combined volume of the STY Assist Gas used during the spin cooling of 1806
TIC, the Pilot Gas usage and the flare leakage rat~)n excess of the permitted gas volume.
2. T/C 1806 SHUT DOWN FOR MAINTENANCE, HAD TO SPIN,COOL THETUBBINE WITH FUEL
GAS BEFORE WORK COULD PROCEED
Action Taken to Stop Flaring:
1. Completed the spin cooling of the T/C and returned usage to normal voulmes.
2. COOL DOWN COMPLETED AND FUEL GAS BLOCKED IN AND DEPRESSURED.
Tuesday, May 25,2004
Page 1 of 1
tJù ~~j
qCt <) v' ol\.l!\(
~'
REPORT NO: 04-0186
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3 DATE: 22 May 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned "VOb.cUME
1. Flare/Relief Valve 00:01 23:59 23 Hrs 58 Mins D D ~ . 1,443 MSCF
2. Flare/Relief Valve 07:50 09:03 1 Hrs 13Mins D D ~ 764 MSCF
3. Flare/Relief Valve 11 :40 11:50 OHrs WMiRS Q D ~ 75"MSCF
4. Flare/Relief Valve 13:07 13:12 o Hrs 5Mins ~ D D 240 MSCF
5. Flare/Relief Valve 13:30 13:40 OHrs 10Mins D D ~ 75 MSCF
TOTAL VOLUME 2,597 MSCF
First Determination of Cause:
1. Flare gas volumes are total of leakage rate, pilot gas, and Assist gas that were in excess of the _~...·wJ
permitted flae volumes. ~ù r7~
2. Spin cranking of TiC JB06Jor spring water wash. ~'l.L,)
3. Purge volume for start up of 1806 T/C after maintenance.
4. 1806 T/C Shutdown due to instrument malfunction.
5. Purge volume for start up of, 1&)6 ::r/G',aftermaintenaflce.
Action Taken to Stop Flaring:
1. Returned gas usage to normal volumes after the T/C was shut down and secured.
2. Completed water wash and secured unit.
3. Machine brought on-line.
4. Instrument repaired and brought on line.
5. Machine brought on-line.
Tuesday, May 25, 2004
Page 1 of 1
.
REPORT NO: 04-0188
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 23 May 2004
SYSTEM
1. Flare/Relief Valve
TIME OF FLARING Black
Start Step ~re:tienfntermtt:tent,'Smoke
00:01 23:59 23 Hrs 58Mins ~ D
Planned 'VGL~ME
D 640 MSCF
TOTAL VOLUME
640 MSCF
First Determination of Cause:
1. Flare gas volumes are total of leakage rate, pilot gas, and Assist gas that were in excess 6f
permitted flare volumes.
. ""' 6'>'-<"-'
t'-'~ C(1v'?
Action Taken to Stop Flaring:
1. Plant returned to normal after"Title V "tesingun'8roachheaters.
Tuesday, May 25,2004
Page 1 of 1
REPORT NO: 04-0195
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3 DATE: 25 May 2004
TIME OF FLARING
SYSTEM Start ,Stop"" Duration Intermittent
1. Flare/Relief Valve OG:G1 23:59 23 Hrs 58Mins ~
Black
Smoke Planned V.OWME 'l
D D 548 MSCF
TOTAL VOLUME 548 MSCF
Action Taken to Stop Flaring:
1. Assist gas rate was adjusted.
~
;Sù ~ ~~
~s ~~(l/
First Determination of Cause:
1. Flare gas volumes are total of Leakage rate,'Pilot gas, and Assist gas that were in excess óf
permitted flare volumes.
Tuesday, May 25,2004
Page 1 of 1
May 2004 Gas Disposition Report for PBU FS-3
Facility Phone 1-907-659-5592
Sept 29,2004:
I talked to Randy, a supervisor at FS-3, about how the flaring events were
worded on the May 2004 monthly report. All events listed for the month,
the wording used to describe the event referenced prior conservation orders
as a rate allowable for gas flared for each month. Each event has the
following statement, 'in excess of the permitted gas volume'. Revised
conservation orders removed the flare amount for each facility. Randy said
he would pass the information on to others.
October 12, 2004
After reviewing the flaring events, Jim Regg didn't understand the wording
in reference to the amount of flared gas. He asked me to contact Randy
again to confirm that the amount listed on the monthly report was the correct
volume. Someone could misunderstand the flared volume with that phrase
at the end of each event about permitted gas volume authorized by the
conservation orders. Randy said he would make sure that the reports are
reviewed and he would pass along the word to other crewmembers.
~
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1, Facility Number
0290000030
2. Facility Name
PBU FS 3
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator 5. MonthNear of Disposition
BP June-2004
20. For production from multiple pools. list contribution of each pool as a percent of
Total Volume.
6. Sold
o
Pool Name
PRUDHOE
Pool Code
640150
Percent
100.00%
7, Reinjected
o
8. Flared or vented 1 hour or less
6,004
9. Flared or vented more than 1 hour (see instr.)
1,000
10. Pilot and Purge
38,554
11. Used for lease operations (specify in Remarks)
896,415
15. Purchased gas
o
~
12. Other (see instructions)
o
13. TOTAL VOLUME (ITEMS 6-12)
941 ,973
MCF
14. NGL Gas Equivalent
o
MCF
Waste:
MCF
16. Transferred from: CGF
912,877
17. Transferred to: (Express as a negative #) CCP
-25,490,464
18. Remarks: Block 11: Fuel Gas = 874,323 mscf and Assist Gas = 22,092 mscf
Signature
Title
Date
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authorit 20 AAC2 .235.
Printed Name
Robert A. Re nolds
Phone (907)564-5028
Form 10-422 Rev. 1/2004
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS-3
GAS FLARING INCIDENT REPORT
June 2004
Page 1
¡unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTIONOFINCIDENT·'éCAUSE
6/14/2004 0200-0205 60 Not required for unplanned events which
6/17/2004 1845-1915 7 are less than or equal to 1 hour
6/17/2004 1830-1835 3
6/18/2004 0240-0250 240
6/18/2004 0250-0300 465
6/18/2004 0700-0737 4,214
6/20/2004 1500-1600 225
6/27/2004 0025-0030 3
6/27/2004 0055-0115 84
6/27/2004 0130-0150 3
6/30/2004 0001-0057 376
6/30/2004 0001-0057 3
TOTAL 5,683
ACTION'TAKENTOiELIMINATE,CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
~unplanned Events greater than 1 hour
DATE TIME VOLuME DES,CRIPTION OFINCIDENT& CAuSE
6/17/2004 1600-1710 466 See attachments
6/20/2004 1830-2330 310
6/20/2004 1830-2300 150
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
TOTAL
926
¡Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Met
DATE TIME VOLUME DESCRIPTION OF INCIDENT& CAUSE
6/17/2004 1915-1920 3 See attachments
6/18/2004 0350-0410 75
6/18/2004 0730-0735 3
6/19/2004 0830·0835 240
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
TOTAL
321
Planned Events Exeeedin 1 Hour OR Exeeedin 5000 Met
DATE TIME VOLuME DESCRIPTION OF INCIDENT & CAuSE
6/5/2004 0605-1820 74 See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
TOTAL
74
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL
5,683
926
321
74
TOTAL FLARED VOLUME
67,650
7'8/2004
10:17 AM
REPORT NO: 04-0209
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 05 Jun 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 06:05 18:20 12Hrs 15Mins D D ~ 74 MSCF
TOTAL VOLUME
74 MSCF
First Determination of Cause:
1. 7B and 70 Common lines Shutdown and Oepressured to enable Valve replacements and
maintenance at OS7.
Action Taken to Stop Flaring:
1. Oepressuring of Commonline(s) completed.
Friday, June 18, 2004
Page 1 of 1
REPORT NO: 04-0228
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 17 Jun 2004
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
18:45 19:15 o Hrs 30 Mins ~ D D 7 MSCF
19:15 19:20 o Hrs 5Mins D D ~ 3 MSCF
TOTAL VOLUME 10 MSCF
First Determination of Cause:
1. Turbine TIC 1801 Shutdown due to high ambient temperatures and would not restart.
2. Flare volume due to purging out compressor during start-up
Action Taken to Stop Flaring:
1. Brought T /C 1802 On line and secured 1801 machine.
2. Purge completed and machine started.
Friday, June 18, 2004
Page 1 of 1
REPORT NO: 04-0226
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 17 Jun 2004
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
16:()() 17:10 1 Hrs 1 () Mins D D D 466 MSCF
18:3() 18:35 () Hrs 5Mins D D D 3 MSCF
TOTAL VOLUME 469 MSCF
First Determination of Cause:
1. 18()1 shutdown on GG high exhaust temp. trip, due to upsets in the plant and high ambient
temperatures.
2. Normal stop of 18()2 after re-starting 1801.
Action Taken to Stop Flaring:
1. After 3 failed starts on 18()1, started 18()2 compressor.
2. Loaded 18()1 compressor, so 18()2 was not needed.
Friday, June 18, 2004
Page 1 of 1
REPORT NO: 04-0234
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 18 Jun 2004
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
3. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
02:40 02:50 () Hrs 1 () Mins ~ D D 240 MSCF
()2:5() ()3:()0 () Hrs 1 () Mins ~ D D 465 MSCF
03:50 04:10 OHrs 2() Mins D D ~ 75 MSCF
TOTAL VOLUME 78() MSCF
First Determination of Cause:
1. T/C 18()6 SHUTDOWN DUE HIGH AMBIENT TEMP'S
2. 3 ABORTED START OF 1806
3. START OF 18()6 T /C
Action Taken to Stop Flaring:
1. 18()6 VENTED AND SECURED
2. MACHINE SECURED
3. MACHINE BROUGHT ON LINE
Thursday, July 01, 2004
Page 1 of 1
REPORT NO: 04-0232
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 18 Jun 2004
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
07:00 07:37 o Hrs 37 Mins ~ D D 4,214 MSCF
07:30 07:35 o Hrs 5Mins D D ~ 3 MSCF
TOTAL VOLUME 4,217 MSCF
First Determination of Cause:
1. 1806 Artificial lift compressor shutdown due to high temp shut down on the compressor. Continued
problem from FS2 being shut down and not having enough users. Re-started 1806 and lost it on
high differntial pressure on the hydraulic oil system. Restarted again and lost it during the transfer to
the control board.
2. Normal stop of 1802 STV/IP compressor after bringing 1801 on line.
Action Taken to Stop Flaring:
1. Shut in wells 7-28, 6-5, 15-16, 7-29, 7-16, and 7-19. Then had a successful start on 1806 at 09:55
am.
2. Depressuring of compressor case complete.
Thursday, July 01, 2004
Page 1 of 1
REPORT NO: 04-0236
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 19 Jun 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve ()8:30 ()8:35 () Hrs 5 Mins D D ~ 24() MSCF
TOTAL VOLUME
24() MSCF
First Determination of Cause:
1. 1806 tic shut down and compressor depressured.
Action Taken to Stop Flaring:
1. Machine isolated and secured.
Thursday, July 01, 2004
Page 1 of 1
REPORT NO: 04-0240
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3 DATE: 20 Jun 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 15:00 16:00 1 Hrs o Mins ~ D D 225 MSCF
2. Flare/Relief Valve 18:30 23:30 5Hrs o Mins ~ D D 310 MSCF
3. Flare/Relief Valve 18:30 23:00 4Hrs 30 Mins ~ D D 150 MSCF
TOTAL VOLUME 685 MSCF
First Determination of Cause:
1. Attempting to start 1806 T/C, 3 complete purge cycles.
2. Attempting to start 1806 T/C, 2 aborted start attempts.
3. Attempting to start 1806 T/C, 2 complete purge cycles.
Action Taken to Stop Flaring:
1. Machine isolated, depressured and secured.
2. Machine Instrumentation problems repaired and machine brought on line.
3. Machine isolated, depressured and secured.
Thursday, July 01 , 2004
Page 1 of 1
GPB Flaring Incidents
To:
Steve McMains, AOGCC
steve mcmains@admin.state.ak.us
907-793-1241, fax 907-276-7542
From:
Hal Tucker, GPB Prod Optim Team Leader,
907-659-4472
Several extended flare events occurred in the past few
weeks at GPB. This is a note giving you a courtesy "heads up" on the
greater than one hour flare events you will be seeing in the monthly gas
disposition reports prepared by the Anchorage Volume Accounting Team.
* GC3 experienced three flare events on June 24, 25 and 26 due to
K5500 shutting down on high lube oil temperature. Temperature probes,
RTD's and switches were changed out during the three days in attempts to
eliminate that root cause of the shut downs. K5500 procedures were
followed to minimize flaring. Total volume for the three events was
1,261 MSCF, total duration for the three events was 7 hours and 17
minutes.
* FS1 experienced one extended flare event beginning at 10:00 June
17 and ending at 02:45 June 18 when the 1801 STV/IP compressor shut down
due to high ambients. Several attempts were made to restart and reload
the machine. Total flare volume for the event was 8,491 MSCF over 16
hours and 45 minutes.
* GC2 experienced two flare events on May 30 and 31 due to PLC
malfunction in the produced water section of the plant. The production
cuts resulting from the water section upset caused the skid 18, IP and
LP compressors to surge intermittently due to the low GC oil rate. The
compressors loaded up as GC2 oil rates returned to normal. Total volume
for the two events was 920 MSCF, total duration was 5 hours and 31
minutes.
* CGF experienced two flare events on June 17 and 18. The first
event occurred when the 1884 tandem shut down 3 times due to high
ambient temperatures over a 2 hour period. Each shut down resulted in 15
minutes of flaring. This event should have been captured as three
separate flaring events and should not be considered as a greater than
one hour event. The second event occurred when the 1805 MI compressor
shut down a recycle trip while loading the boosters. Flaring stopped
when 1805 was restarted. Total duration for the 1805 event was 1 hour
and 14 minutes, total volume was 8,677 MSCF.
* LPC experienced one flare event on June 17 when the 1808 gas
reinjection turbine shut down. Flaring stopped when 1808 was restarted.
Iof2
6/28/20047:02 AM
GPB Flaring Incidents
~Gas was cut during the event to reduce flare volume. Total duration for
the event was 1 hour and 16 minutes, total volume was 5,804 MSCF.
* ~ experienced two flare events on June 17 and June 20. The
first event occurred when the 1801 STV/IP compressor shut down due to
high ambients and plant upsets. After three failed restart attempts, the
spare machine (1802) was started, ending the flare event. Total duration
for this event was 1 hour and 10 minutes, total volume was 466 MSCF. The
second event occurred when the 1806 gas lift machine shut down due to
instrumentation problems. 1806 was secured and depressured, ending the
flare event. Total duration of the event was 6 hours of intermittent
flaring totaling 685 MSCF.
If you require additional information, please do not
hesitate to call me.
Hal Tucker
GPB Production Optimization TL
2 of 2
6/28/20047:02 AM
'",
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000030
2. Facility Name
PBU FS 3
Disposition
3. Field
PBU - EOA
Volume MCF
6. Sold
o
7, Reinjected
o
8. Flared or vented 1 hour or less
750
9. Flared or vented more than 1 hour (see instr.)
15,509
10. Pilot and Purge
28,256
11. Used for lease operations (specify in Remarks)
659,771
12. Other (see instructions)
o
13. TOTAL VOLUME (ITEMS 6-12)
704,286
14. NGL Gas Equivalent
o
15. Purchased gas
o
16. Transferred from: CGF
676,355
17. Transferred to: (Express as a negative #) CCP
-17,638,383
18. Remarks: Block 11: Fuel Gas = 648,099 mscf and Assist Gas = 11,672 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
S;,OO"Æ Q (1. Æ Üì~
Printed Name Robert A. Re nolds
Title
Phone (907)564-5028
Form 10-422 Rev. 1/2004
4. Operator
5. Month/Year of Disposition
BP Jul -2004
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
Pool Name
PRUDHOE
Pool Code
640150
Percent
100.00%
~
15501
MCF
MCF
MCF
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authorit 20 AAC2 . 35.
Date
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT· FS·3
GAS FLARING INCIDENT REPORT
July 2004
Page 1
¡unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
7/2/2004 1650-1725 182 Not required for unplanned events which
7/3/2004 2250-2310 121 are less than or equal to 1 hour
7/6/2004 0753·0823 180
7/9/2004 1350-1420 91
7/13/2004 1935-1940 52
7/23/2004 1650-1655 3
7/25/2004 0448-0458 52
TOTAL
681
¡unplanned Events ~reater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
7/13/2004 0424·0531 377 See attachments
7/20/2004 0900-2359 92
7/20/2004 1200-2359 425
7/22/2004 2030-2200 589
TOTAL
1 ,483
¡Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
7/3/2004 0130-0140 60 See attachments
7/25/2004 1136-1141 3
7/30/2004 1350-1355 3
7/31/2004 1925-1930 3
TOTAL 69
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
¡Planned Events Exceedin~ 1 Hour OR Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
7/3/2004 0350-2135 717 See attachments
7/4/2004 0150-2330 88
7/10/2004 0015-1100 646
7/10/2004 0015-1100 10,685
7/13/2004 1842-2359 1,890
TOTAL
14,026
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
1,483
69
14,026
56,187
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
8/9'2004
9:55 AM
REPORT NO: 04-0271
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 03 Jul 2004
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
3. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
()1 :3() ()1 :4() OHrs 1()Mins D D ~ 6() MSCF
()3:50 21:35 17 Hrs 45 Mins ~ D ~ 717 MSCF
22:5() 23:1 () () Hrs 2() Mins D D D 121 MSCF
TOTAL VOLUME 898 MSCF
First Determination of Cause:
1. 1803 T /C Normal Shutdown. Unit shutdown due to gas cuts in preparation for 'B' Slug Catcher
shutdown/clean-out.
2. 'B' Slug Catcher preparation for clean-out/inspection depressuring. Depressuring enables draining
and refilling with wash solution and inerting vessel in preparation for opening, ventilating and entry.
3. DS14B/C depressuring via P377ASV due to excessive pressure. 14B/C was shut-in in support of 'B'
Slug Catcher shutdown, clean-out/inspection.
Action Taken to Stop Flaring:
1. Normal Shutdown.
2. Necessary flaring in support of vessel clean-out/inspection.
3. Pressure relieved. Flaring stopped.
Wednesday, July 28,2004
Page 1 of 1
REPORT NO: 04-0274
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 04 Jul 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. FlarelRelief Valve 01 :50 23:30 21 Hrs 40 Mins ~ D ~ 88 MSCF
TOTAL VOLUME
88 MSCF
First Determination of Cause:
1. 'B' Slug Catcher Shutdown, Clean-Out, Inspection preparation.
Action Taken to Stop Flaring:
1. Necessary flaring in support of vessel clean-out/inspection.
Wednesday, July 28,2004
Page 1 of 1
REPORT NO: 04-0284
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 10 Jul 2004
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
GG: 15 11 :GG 10 Hrs 45 Mins ~ D ~ 646 MSCF
GO: 15 11:00 1 G Hrs 45 Mins ~ D ~ 1 G,685 MSCF
TOTAL VOLUME 11,331 MSCF
First Determination of Cause:
1. Facility (FS3 & Drillsites) Shutdown and Depressured for Maintenance/Repairs/Replacement
Activities (Turn-Around).
Metered Volume from Meter 355 "Operational Flare".
2. Facility (FS3 & Drillsites) Shutdown and Depressured for Maintenance/Repair/Replacement
Activities (Turn-Around).
Action Taken to Stop Flaring:
1. Safely completed depressuring of Facility to enable manintenance/repair/replacement activities.
2. Safely completed depressuring of Facility to enable maintenance/repair/replacement activiites.
Wednesday, July 28, 2004
Page 1 of 1
REPORT NO: 04-0293
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 13 Jul 2004
TIME OF FLARING
SYSTEM Start Stop Duration Intermittent
1. Flare/Relief Valve ()4:24 ()5:31 1 Hrs 7Mins ~
2. Flare/Relief Valve
3. Flare/Relief Valve
18:42 23:59 5 Hrs 17Mins ~
19:35 19:4() () Hrs 5 Mins D
Black
Smoke Planned VOLUME
D D 377 MSCF
D ~ 1 ,890 MSCF
D D 52 MSCF
TOTAL VOLUME 2,319 MSCF
First Determination of Cause:
1,. Facility Startup after completion of ALPS Proration.
'C' Slug Catcher intermittent flaring.
2. Facility Startup after completion of ALPS Proration.
18()6 T/C aborted start attempts. Unit shutting down on various Combustion trouble events and S.O.
, Overhead Tank high levels.
3. Facility Startup after completion of ALPS Proration.
18()1 T/C shutdown due to high discharge temperature.
Action Taken to Stop Flaring:
1. Stabilized flow and pressures in 'C' slug Catcher by shutting in commonline which had a leaky divert
into 'c' Train.
2. Attempted correcting problems and restarting unit.
3. 18()1 T/C brought back online.
Wednesday, July 28,2004
Page 1 of 1
REPORT NO: 04-0306
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 20 Jul 2004
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
09:00 23:59 14 Hrs 59 Mins D D D 92 MSCF
12:00 23:59 11 Hrs 59 Mins D D D 425 MSCF
TOTAL VOLUME 517 MSCF
First Determination of Cause:
1. Shut down and depressured 14B/C common line after all the wells were shut in and blocked. This
was done to pull the inlet valve F1 blind on 14-1296 slug catcher, due to leaking divert valves.
2. Shut down and depressured 6C/13Bcommon line after all the wells were shut in and blocked. This
was done to pull the inlet valve F1 blind on 14-1296 slug catcher, due to leaking divert valves.
Action Taken to Stop Flaring:
1. Completed blind removal.
2. Completed blind removal.
Wednesday, July 28, 2004
Page 1 of 1
REPORT NO: 04-0307
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 22 Jul 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 20:30 22:00 1 Hrs 30 Mins D D D 589 MSCF
TOTAL VOLUME
589 MSCF
First Determination of Cause:
1. 1801 compressor shut down on a control relay power problem.
Action Taken to Stop Flaring:
1. Started 1802 compressor after correcting a CCC controller problem.
Wednesday, July 28, 2004
Page 1 of 1
REPORT NO: 04-0313
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 25 Jul 2004
SYSTEM I
1. Flare/Relief \{alve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
()4:48 04:58 () Hrs 1 () Mins D D D 52 MSCF
11:36 11 :41 () Hrs 5Mins D D ~ 3 MSCF
TOTAL VOLUME 55 MSCF
First Determi~ation of Cause:
1. 18()1 compre~sor shut down on a high exghaust temp shut down.
2. Shut down 1 ~()2 compressor after loading and unloading to set seals on IP and STV compressor.
Action Taken ¡to Stop Flaring:
1. Re-started 1 ~01 compressor.
2. 1802 compressor case completed de pressuring.
Wednesday, July 2~, 2004
Page 1 of 1
REPORT NO: 04-031 6
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 30 Jul 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. FlarelRelief Valve 13:5() 13:55 () Hrs 5 Mins D D ~ 3 MSCF
TOTAL VOLUME
3 MSCF
First Determination of Cause:
1. 18()1 TIC normal shutdown. Reason to initiate shutdown was due to a Gas Generator L.O. leak.
1802 T/C was brought online prior to shutting down 18()1 TIC.
Action Taken to Stop Flaring:
1. Normal Shutdown.
VVednesday,August04,2004
Page 1 of 1
REPORT NO: 04-0319
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 31 Jul 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 19:25 19:3() () Hrs 5 Mins D D ~ 3 MSCF
TOTAL VOLUME
3 MSCF
First Determination of Cause:
1. 1802 T/C normal shutdown. 1801 T/C brought back on line prior to shutting down 18()2.
Action Taken to Stop Flaring:
1. Normal shutdown.
VVednesday,August04,2004
Page 1 of 1
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000030
2. Facility Name
PBU FS 3
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator 5, Month/Year of Disposition
BP Au ust-2004
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
o
Pool Name
PRUDHOE
Pool Code
640150
Percent
100.00%
7. Reinjected
o
8. Flared or vented 1 hour or less
2,360
12. Other (see instructions)
o
-.::rn~
9. Flared or vented more than 1 hour (see instr.)
19,822
10. Pilot and Purge
23,786
11. Used for lease operations (specify in Remarks)
888,801
13. TOTAL VOLUME (ITEMS 6-12)
934,769
14. NGL Gas Equivalent
o
15. Purchased gas
o
16. Transferred from: CGF
899,735
17. Transferred to: (Express as a negative #) CCP
-26,603,146
18. Remarks: Block 11: Fuel Gas = 875,949 mscf and Assist Gas = 12,852 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature Q (}. L/1r~
Title
Date
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authorit 20 AAC2 .235.
Printed Name
Robert A. Re nolds
Phone (907)564-5028
Form 10-422 Rev. 1/2004
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS-3
GAS FLARING INCIDENT REPORT
August 2004
Page 1
1~~~lann:~.~~:~ts les~t~~~,.~~. equal t~.1.hour
:'%%L::,:g~~~§::gLLLgggggggL:g~!M§;g;¡;g;;.,::gggggLL~~!4¡Mr¡¡:LgL:gg,ªç~!l;BIe:~!~"":¡~!ffi¡!fr.I!l;Iاfr.I'J¥~%~~t;I~§L
8/7/2004 1730-1830 215 Not required for unplanned events which
8/9/2004 1005-1008 180 are less than or equal to 1 hour
8/9/2004 1030-1034 240
8/9/2004 1652-1657 3
8/10/2004 0020-0050 111
8/10/2004 0125-0150 92
8/11/2004 0905-0920 60
8/12/2004 0502-0535 217
8/12/2004 0707-0730 275
8/13/2004 0518-0539 209
8/20/2004 1550-1605 3
8/22/2004 1500-1520 145
8/22/2004 1530-1535 3
:A~TI~fr.lTAKENTO ELlMIfr.iATECAUSE ' " '
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
1,753
~Unplanned Events greater than 1 hour
, DATE',,', ' 'TiME ." ',' .',,' VOLUMEQESÇRIPTION OFINCIDENT & CAUSE""
8/17/2004 1612-2230 810 See attachments
8/18/2004 1412-1835 546
ACTiON TAKEN TO ELIMINATE CAUSe: "
See attachments
TOTAL
1,356
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mef
8/4/2004 0830-0833 3 See attachments See attachments
8/8/2004 2030-2040 240
8/9/2004 1 940-1945 3
8/24/2004 1 030-1 045 3
8/24/2004 1500-1505 3
8/31/2004 1645-1730 355
TOTAL 607
9/10/2004
1 :32 PM
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT· FS-3
GAS FLARING INCIDENT REPORT
August 2004
Jplanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
:F:FWW;:º,~'rg:>"'" ""'nn:!I1tMg:;wnn,"'¡wn;"'C:>:I#,!;,IMI5F"'wnº,,ª§~EJI(!,!I1Ic:>:iI!4:¡C:>:!Eit1!I~Iº,gN!I1i~n~~!;,I§,ªinn" '"
8/7/2004 0307-0735 7,540 See attachments
8/7/2004 142G-1605 1 ,267
8/16/2004 0230-0530 1 ,806
8/16/2004 0535-200G 2,273
8/31/20G4 0710-1805 4,815
8/31/2004 1730-213G 765
TOTAL
18,466
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
1,753
1,356
607
18,466
TOTAL FLARED VOLUME
58,820
Page 2
'" ACTIOtfTAKEN TO ELIMINATE CAUSE ,'.",' '
See attachments
I
9/1 0/2004
1 :32 PM
REPORT NO: 04-0321
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 04 Aug 2004
SYSTEM
1. Other
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
08:30 ()8:33 () Hrs 3 Mins D D ~ 3 MSCF
TOTAL VOLUME
3 MSCF
First Determination of Cause:
1. Module 4922 Residue Gas Pig Launcher manually depressured to atmosphere via vent line.
Action Taken to Stop Flaring:
1. Completed depressuring.
VVednesday,August25,2004
Page 1 of 1
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 07 Aug 2004
REPORT NO: 04-0329
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
03:07 07:35 4Hrs 28 Mins D D ~ 7,540 MSCF
14:20 16:05 1 Hrs 45 Mins D D ~ 1,267 MSCF
TOTAL VOLUME 8,807 MSCF
First Determination of Cause:
1. Depressuring artificial lift tieline between FS3 and GC3.
2. Depressure AL line to keep it below 500# for line lift.
Action Taken to Stop Flaring:
1. Stopped depressuring.
2. Stopped depressuring.
VVednesday,August25,2004
Page 1 of 1
REPORT NO: 04-0331
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 08 Aug 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 2():3() 2():4() () Hrs 1 () Mins D D ~ 24() MSCF
TOTAL VOLUME
24() MSCF
First Determination of Cause:
1. 18()6 T /C Shutdown and depressured
Action Taken to Stop Flaring:
1. 18()6 depressured and secured
VVednesday,August25,2004
Page 1 of 1
REPORT NO: 04-0336
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3 DATE: 09 Aug 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 10:05 10:08 o Hrs 3Mins ~ D D 180 MSCF
2. Flare/Relief Valve 10:30 10:34 0Hrs 4Mins ~ D D 240 MSCF
3. Flare/Relief Valve 16:52 16:57 o Hrs 5Mins D D D 3 MSCF
4. Flare/Relief Valve 19:40 19:45 o Hrs 5Mins D D ~ 3 MSCF
TOTAL VOLUME 426 MSCF
First Determination of Cause:
1. Slug Catchers went to flare while trying to optimize producton
2. Slug catchers went to flare while trying to optimize production.
3. 1801 T/C Shutdown on Hi IP discharge temperature.
4. 1802 TIC Planned shutdown to run 1801 T/C
Action Taken to Stop Flaring:
1. Trimmed back on rate.
2. Trimmed back more on rate.
3. Loaded 1802 T/C.
4. Unit depressured.
VVednesday,August25,2004
Page 1 of 1
REPORT NO: 04-0357
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3 DATE: 16 Aug 2004
TIME OF FLARING
SYSTEM Start Stop Duration Intermittent
1. Controlled Blowdow ()2:3() ()5:3() 3 Hrs () Mins D
2. Controlled Blowdow ()5:35 2():()() 14 Hrs 25 Mins D
Black
Smoke Planned VOLUME
D ~ 1 ,8()6 MSCF
D ~ 2,273 MSCF
TOTAL VOLUME 4,()79 MSCF
First Determination of Cause:
1. Shutdown and depessured Common Lines 158 & 15D for planned maintenance.
2. Shutdown and depessured Common Lines 7C/15C for planned maintenance.
Action Taken to Stop Flaring:
1. Lines depressured and secured.
2. Lines depressured and secured.
VVednesday,August25,2004
Page 1 of 1
REPORT NO: 04-0381
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 17 Aug 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 16:12 22:30 6Hrs 18Mins D D D 810 MSCF
TOTAL VOLUME
810 MSCF
First Determination of Cause:
1. 1803 T /C shut down for anti surge valve piping repair. 1804 T /C unloaded during OSD upset on C
slug catcher.
Action Taken to Stop Flaring:
1. Re paired 1803 anti surge valve piping and loaded 1804 T /C .
VVednesday, August25,2004
Page 1 of 1
REPORT NO: 04-0382
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 18 Aug 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 14:12 18:35 4 Hrs 23 Mins D D D 546 MSCF
TOTAL VOLUME
546 MSCF
First Determination of Cause:
1. 1801 T /C shut down due to hi compressor diischarge temperatures. 1802 T /C was started and also
shut down on high STV compressor discharge temperature.
Action Taken to Stop Flaring:
1. Started 1801 after cool cranking and secured 1802.
Thursday, September 09, 2004
Page 1 of 1
REPORT NO: 04-0398
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 31 Aug 2004
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
3. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
()7:1 () 18:()5 1 () Hrs 55 Mins D D ~ 4,815 MSCF
16:45 17:3() OHrs 45 Mins D D ~ 355 MSCF
17:3() 21 :3() 4Hrs () Mins D D ~ 765 MSCF
TOTAL VOLUME 5,935 MSCF
First Determination of Cause:
1. 18()2 T/C Normal Shutdown to enable STV/IP Fin Fan "Fin Foam" cleaning. Flaring from Process
VesselslTrains.
2. 6C/13B Commonline depressured to HP Flare due to reported liquid leak on Commonline.
3. 6C/13B Commonline AL Gas swept in attempt to remove liquids from line due to liquid leak.
Action Taken to Stop Flaring:
1. Successfully completed STV/IP Fin Fan cleaning.
18()2 T/C Train brought back online.
2. Completed initial depressuring after desired pressure was achieved.
3. AL Gas sweep discontinued after desired amount of liquids was swept from the Common line.
Thursday, September 02, 2004
Page 1 of 1
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000030
2. Facility Name
PBU FS 3
Disposition
3. Field
PBU - EOA
Volume MCF
6. Sold
o
7. Reinjected
o
8. Flared or vented 1 hour or less
4,288
9. Flared or vented more than 1 hour (see instr.)
4,660
10. Pilot and Purge
27,497
11. Used for lease operations (specify in Remarks)
870,071
12. Other (see instructions)
o
13. TOTAL VOLUME (ITEMS 6·12)
906,516
14. NGL Gas Equivalent
o
15. Purchased gas
o
16. Transferred from: CGF
881,975
17. Transferred to: (Express as a negative #) CCP
-27,546,537
18. Remarks: Block 11: Fuel Gas = 854,478 mscf and Assist Gas = 15,593 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature~~ ~
F
4. Operator 5. MonthNear of Disposition
BP Se tember-2004
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
Pool Name
PRUDHOE
Pool Code
640150
Percent
100.00%
~
Printed Name
Robert A. Re nolds
Phone (907)564-5028
Title Mana er, State Taxes and Ro alt
DateLC -l)'- C(
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authorit 20 AAC25.235.
Form 10-422 Rev. 1/2004
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS-3
GAS FLARING INCIDENT REPORT
September 2004
Page 1
lunPlanned Events less than or equal to 1 hour
'''''''';'iº~m!?'r' 'iF'im'i¡ifÅ“;rif'Fmll\ll:!?rr",""""m'iFF~Ç4,ª!¡';I\IJE,''i¡Fifif;,ª,ª~~øllilÇ4!9¡:Ç4¡¡Ft~II!1l:!?~ifld!II!il~e'i'iW''''''
9/5/2004 0530-0615 1,210 Not required for unplanned events which
9/9/2004 1750-1800 40 are less than or equal to 1 hour
9/10/2004 1805-1830 672
9/10/2004 2200-2230 5
9/11/2004 0200-021 0 329
9/12/2004 1153-1210 4
9/13/2004 1340-1350 4
9/14/2004 0338-0345 376
9/19/2004 2351-2359 888
TOTAL
3,528
~Unplanned Events greater than 1 hour
'DATE 'T!ME, ' ",'," VOLUME " DE5Çf!IPTIONOFINÇIDE!9T & CAUSE
9/5/2004 0230-0900 20 See attachments
9/10/2004 1730-1930 280
9/11/2004 1 028-1725 240
9/13/2004 2000-2247 480
9/14/2004 0720-1030 720
9/26/2004 1811-2054 1,200
TOTAL 2,940
'ACTIO!9mAKENTq!?,ªIMINATEC~!ilSE " " ,
Not required for unplanned events which
are less than or equal to 1 hour
,','"ACTION TAKEN TQELIMINATE CAUSE,
See attachments
Planned Events Less Than or Equal 1 Hour AND Not Exceedin
9/3/2004 0545-0555 60 See attachments See attachments
9/5/2005 0530-0540 60
9/9/2004 0400-041 0 60
9/9/2004 1040-1140 40
9/10/2004 0710-0720 60
9/11/2004 0654-0705 240
9/24/2004 2000-2010 240
TOTAL 760
10/6/2004
10:55 AM
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS-3
GAS FLARING INCIDENT REPORT
September 2004
Page 2
9/5/2004 0730-G900 563 See attachments See attachments
9/9/2004 G300-0700 165
9/9/2004 G735-1055 263
9/9/2004 1 055-1800 289
9/11/2004 130G-1700 300
9/11/2004 150G-1615 125
9/13/2004 1702-1842 15
TOTAL 1,720
Unplanned Events < 1 Hour 3,528
Unplanned Events> 1 Hour 2,940
Planned Events < 1 hour and not 760
exceeding 5,000 MCF
Planned Events> 1 hour or 1,720
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME 52,038
10/6/2004
1 0:55 AM
REPORT NO: 04-0400
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 03 Sep 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve ()5:45 05:55 0 Hrs 1 () Mins D D ~ 5() MSCF
TOTAL VOLUME
60 MSCF
First Determination of Cause:
1. 18()3 TIC Normal Shutdown to enable Fin Fan Discharge Cooler "Fin Foam" Cleaning.
Action Taken to Stop Flaring:
1. Production was previously reduced prior to Unit being shutdown.
Unit was Normal Shutdown from Idle.
Monday, September 27, 2004
Page 1 of 1
REPORT NO: 04-0407
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3 DATE: 05 Sep 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 02:30 ()9:()() 6Hrs 3() Mins D D D 2() MSCF
2. FlarelRelief Valve ()5:30 06:15 OHrs 45 Mins ~ D D 1,21() MSCF
3. Flare/Relief Valve 05:30 05:4() OHrs 1 () Mins D D ~ 6() MSCF
4. Flare/Relief Valve ()7:30 09:0() 1 Hrs 3() Mins D D ~ 563 MSCF
TOTAL VOLUME 1 ,853 MSCF
First Determination of Cause:
1. 18()2 TIC IP Compressor Recycle Controller malfunction (instrumentation malfunction) Flaring from
P504V - IP Suction Scrubber.
2. Flaring from Slug Catcher after 1804 Normal Shutdown. Excess production.
3. 18()4 T/C Normal Shutdown for Fin Fan "Fin Foam" Cleaning.
4. 1802 TIC Normal Shutdown due to Instrumentation Malfunction (IP Compressor Recycle Controller).
Action Taken to Stop Flaring:
1. Unsuccessfully attempted repairs to Controller.
18()1 T /C brought online.
2. Additional production shut-in to eliminate flaring event.
3. Normal Shutdown. Production cut back prior to Unit being shutdown.
4. 18()1 T/C Brought Online after repairing Fuel Gas Starter piping and Ignition Wiring Harness.
Monday, September 27, 2004
Page 1 of 1
REPORT NO: 04-0417
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3 DATE: 09 Sep 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 03:00 G7:00 4Hrs OMins D D ~ 165 MSCF
2. Flare/Relief Valve 04:GO G4: 10 G Hrs 1 G Mins D D ~ 60 MSCF
3. Flare/Relief Valve 1 G:40 11:40 1 Hrs OMins D D ~ 40 MSCF
4. Flare/Relief Valve 17:50 18:GO OHrs 10 Mins ~ D D ~)
TOTAL VOLUME 3G5 MSCF
First Determination of Cause:
1. 18G3 Turbine spin cooling for water wash.
2. Shut down 1803 for planned fall water wash.
3. Spin turbine 1803 for water wash.
~ 4. Aborted startup of 1803
Action Taken to Stop Flaring:
1. 1803 Turbine spin cooling completed.
2. Compressor secured.
3. Spin completed compressor secured.
4. Compressor secured and restarted
Monday, September 27, 2004
Page 1 of 1
REPORT NO: 04-0416
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 09 Sep 2004
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
07:35 1Ø:55 3Hrs 20 Mins D D ~ 263 MSCF
10:55 18:00 7Hrs 5Mins D D ~ 289 MSCF
TOTAL VOLUME 552 MSCF
First Determination of Cause:
1. Gas train shutdown for scheduled maintance.
2. Drill site 14 shutdown for scheduled maintance.
Action Taken to Stop Flaring:
1. Train depressured and secured.
2. Drill site shutdown and secured.
Monday, September 27, 2004
Page 1 of 1
REPORT NO: 04-0422
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3 DATE: 10 Sep 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve ()7: 1 () 07:20 OHrs 1 () Mins D D ~ 6() MSCF
2. Flare/Relief Valve 17:30 19:30 2Hrs () Mins ~ D D ~~
3. Flare/Relief Valve 18:()5 18:3() OHrs 25 Mins ~ D D 672
4. Flare/Relief Valve 22:0() 22:3() OHrs 3() Mins ~ D D 5 MSCF
TOTAL VOLUME 1,017 MSCF
First Determination of Cause:
1. 1804 shut down for fall water wash.
~. 7 aborted starts on 1804 TIC
3. Attempted start of 1804 TIC excess production
4. 1801 TIC shutdown on high vibration.
Action Taken to Stop Flaring:
1. Equmpment was secured.
2. Insturmation worked on the TIC
3. Reduced production.
4. Restarted 18()1 TIC
Monday, September 27, 2004
Page 1 of 1
REPORT NO: 04-0424
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3 DATE: 11 Sep 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 02:00 02: 1() OHrs 10 Mins ~ D D 329 MSCF
2. Flare/Relief Valve 06:54 07:05 o Hrs 11 Mins D D ~ 240 MSCF
3. Flare/Relief Valve 10:28 17:25 6Hrs 57 Mins ~ D D ~F
4. Flare/Relief Valve 13:00 17:00 4Hrs o Mins D D ~ 300 MSCF
5. Flare/Relief Valve 15:00 16:15 1 Hrs 15 Mins D D ~ 125 MSCF
TOTAL VOLUME 1,234 MSCF
First Determination of Cause:
1. 1804 T/C developed lube oil leak.
2. 1806 T /C shut down for water wash.
~ 3. 6 aborited starts on 1804 T/C.
4. Spin cooling of Turbine 1806 for planned Maintenance.
5. Spin cooling of Turbine 1804 for maintenance work.
Action Taken to Stop Flaring:
1. Shutdown 1804 T/C and secured equmpment-excess production.
2. 1806 T/C secured.
3. Insturmation worked on T/C.
4. Cooling completed and machine secured.
5. Maintenance completed and machine secured.
Monday, September 27,2004
Page 1 of 1
FACILITY: FS3
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
3. Flare/Relief Valve
REPORT NO: 04-0436
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 13 Sep 2004
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
13:40 13:50 0Hrs 10 Mins ~ D D 4 MSCF
17:02 18:42 1 Hrs 40 Mins D D ~ 15 MSCF
20:00 22:47 2 Hrs 47 Mins ~ D D ~
TOTAL VOLUME 499 MSCF
First Determination of Cause:
1. 1801 T /C shutdown on high vibration.
~
Action Taken to Stop Flaring:
1. Secured 1801 T/C and restarted.
2. Water wash complete TIC shutdown.
3. Secured the T/C.
Monday, September 27, 2004
Page 1 of 1
REPORT NO: 04-0433
BPXA FLARE REPORT
PRUDHOE SAY
FACILITY: FS3
DATE: 14 Sep 2004
SYSTEM
1. FlarelRelief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned
03:38 03:45 0 Hrs 7 Mins ~ D D
07:20 10:30 3 Hrs 10 Mins ~ D D
TOTAL VOLUME
First Determination of Cause:
1. Slug catchers pressured up due to field constrants. Excess production.
~2. 3 aborted starts on 1806 T/C.
Action Taken to Stop Flaring:
1. Another facility coming on line.
2. Started 1806 T/C and loaded.
Monday, September 27, 2004
VOLUME
376 MSCF
~
-~.._-~"
1,096 MSCF
Page 1 of 1
REPORT NO: 04-0459
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 24 Sep 2004
TIME OF FLARING Slack
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 20:00 20:1Ø 0 Hrs 10Mins D D ~ 240 MSCF
TOTAL VOLUME
240 MSCF
First Determination of Cause:
1. 1806 TIC shut down for starting turbine repair.
Action Taken to Stop Flaring:
1. 1806 TIC secured
Monday, September 27,2004
Page 1 of 1
FACILITY: FS3
SYSTEM
1. Flare/Relief Valve
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 26 Sep 2004
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke
18: 11 2G:54 2 Hrs 43 Mins ~ D
REPORT NO: 04-0463
Planned VOLUME
D~
~"~'~"- ~.,,,,,...,_.._J
TOTAL VOLUME 1,20G MSCF
First Determination of Cause:
~ 1. 1806 T /C aborted start attempts. Hydraulic oil pressure problems.
Action Taken to Stop Flaring:
1. Corrected problem and restarted unit.
Monday, September 27, 2004
Page 1 of 1
_.I.u
To: Steve McMains, AOGCC
steve_mcmains@admin.state.ak.us
907-793-1241, fax 907-276-7542
From: Michael Bolkovatz, GPB Prod Optim Team Leader, 907-659-4472/5566
An extended flaring event occurred 9/26 at FS-3. Turbine Compressor 1806 was shutdown to
repair the starter motor on 9/25. The starter motor was replaced and the machine was
restarted the next day. Several start attempts were made before the machine restarted. The
machine would not start due to hydraulic oil pressure problems. Intermittent flaring occurred
over 2 hrs, 43 mins and a total volume of 1200 MSCF was flared.
If you require additional information, please don't hesitate to call me.
Michael Bolkovatz
GPB Production Optimization TL
659-4472/5566
1 of 1
9/28/2004 6:09 AM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000030
2. Facility Name
PBU FS 3
Disposition
3. Field
PBU - EOA
Volume MCF
6. Sold
o
7. Reinjected
o
8, Flared or vented 1 hour or less
3
9. Flared or vented more than 1 hour (see instr.)
o
10. Pilot and Purge
32,074
11. Used for lease operations (specify in Remarks)
982,279
12. Other (see instructions)
o
13. TOTAL VOLUME (ITEMS 6-12)
1,014,356
14. NGL Gas Equivalent
o
15. Purchased gas
o
16. Transferred from: CGF
1,013,340
17. Transferred to: (Express as a negative #) CGF
-33,118,027
18. Remarks: Block 11: Fuel Gas = 981,266 mscf and Assist Gas = 1,013 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature~~
Printed Name Bernard W. Ha'n
f2c:v-
4. Operator 5. Month/Year of Disposition
BP October-2004
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
Pool Name
PRUDHOE
Pool Code
640150
Percent
100.00%
Phone (907)564-5028
Title Mana er, Production Taxes and Ro alt
Date l\-
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Auth rit 0 AAC25.235.
Form 10-422 Rev. 1/2004
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS-3
GAS FLARING INCIDENT REPORT
October 2004
Page 1
Not required for unplanned events which
are less than or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
G
Unplanned Events reater than 1 hour
See attachments
See attachments
TOTAL
o
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
10/24/2004 1300-1305
3 See attachments
See attachments
TOTAL
3
See attachments
See attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
o
3
o
33,090
11/9/2004
10:59 AM
REPORT NO: 04-0518
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 24 Oct 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 13:GO 13:G5 0 Hrs 5 Mins D D ~ 3 MSCF
TOTAL VOLUME
3 MSCF
First Determination of Cause:
1. 1801 T /C Normal Shutdown from idle.
Action Taken to Stop Flaring:
1. Normal Shutdown. Unit returned to standby mode.
Sunday, October 31, 2004
Page 1 of 1
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000030
2. Facility Name
PBU FS 3
Disposition
3. Field
PBU-EOA
Volume MCF
0
0
6
743 /
30,773
979,415
0
1,010,937
0
0
1,009,924
-34,556,785
6. Sold
7. Reinjected
8. Flared or vented 1 hour or less
9. Flared or vented more than 1 hour (see instr.)
10. Pilot and Purge
11. Used for lease operations (specify in Remarks)
12. Other (see instructions)
13. TOTAL VOLUME (ITEMS 6-12)
14. NGL Gas Equivalent
15. Purchased gas
16. Transferred from: CGF
17. Transferred to: (Express as a negative #) CGF
18. Remarks: Block 11: Fuel Gas = 979,151 mscf and Assist Gas = 264 mscf
1~'::::,~-?7;;ro.'~"OfmYM-
Printed Name Bernard W. Ha'n
4. Operator 5. Month/Year of Disposition
BP November-2004
20. For production from multiple pools. list contribution of each pool as a percent of
Total Volume,
Pool Name
PRUDHOE
Pool Code
640150
Percent
100.00%
,5je-
MCF
MCF
MCF
1-/1-
Date
Phone (907)564-5028
Title Mana er, Production Taxes and Ro alt
/' ') _/''-1,' . £'j (/
Date 0"'"
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authorit 20 AAC25.235.
Form 10-422 Rev. 1/2004
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS-3
GAS FLARING INCIDENT REPORT
November 2004
Page 1
Unplanned Events less than or equal to 1 hour
11/13/2004 1538-1545
3 Not required for unplanned events which
are less than or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
3
11/1Ø/20G4 1010-1600
743 See attachments
See attachments
TOTAL
743
Planned Events Less Than or Equal 1 Hour AND Not Exceedin
11/18/2004
1645-1650
3 See attachments
See attachments
TOTAL
3
~Planned Events ExceedinQ 1 Hour OR Exceeding 5000 Mcf
" "··I;):AJE., ,,' ,. '",.' <TJME ,,', " ' " . VOLUMEJ>ESQRIPT10Jil Pf:,NCIDENT &,CAUSE ,',', '
See attachments
,'., ,'., > ACTION JAKENTOELIMINATE CAUSE
See attachments
f
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
743
3
o
31,786
12/6/2004
4:08 PM
REPORT NO: 04-0531
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 10 Nov 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 10: 1() 16:00 5 Hrs 50 Mins ~ D D 743 MSCF
TOTAL VOLUME
743 MSCF
First Determination of Cause:
1. Depressured DS 14 Artificil Lift Gas line to replace leaking grease zerk fitting.
Action Taken to Stop Flaring:
1. Line depressured, zerk replaced and line bleeds closed.
Monday,November22,2004
Page 1 of 1
REPORT NO: 04-0538
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 18 Nov 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 16:45 16:5() () Hrs 5 Mins D D ~ 3 MSCF
TOTAL VOLUME
3 MSCF
First Determination of Cause:
1. 18()1 T /C depressuring of case after normal shutdown.
Action Taken to Stop Flaring:
1. 18()1 T /C was secured and put in standby mode.
Monday, November 22, 2004
Page 1 of 1
.~
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACiliTY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000030
2. Facility Name
PBU FS 3
Disposition
6. Sold
7. Reinjected
8. Flared or vented 1 hour or less
9. Flared or vented more than 1 hour (see instr.)
10. Pilot and Purge
11. Used for lease operations (specify in Remarks)
12. Other (see instructions)
13. TOTAL VOLUME (ITEMS 6-12)
14. NGL Gas Equivalent
15. Purchased gas
16. Transferred from: CGF
17. Transferred to: (Express as a negative #) CGF
18. Remarks: Block 11: Fuel Gas = 1,026,876 mscf and Assist Gas = 847 mscf
Printed Name
Form 10-422 Rev. 1/2004
3. Field
PBU - EOA
Volume MCF
0
0
901
289 /
27,648
1,027,723
0
1,056,561
0
°
1,054,524
-35,556,659
4. Operator 5. Month/Year of Disposition
BP December-2004
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
Pool Name
PRUDHOE
Pool Code
640150
Percent
100.00%
J8v"--
Phone (907)564-5028
Date
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authorit 20 AAC25.235.
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS-3
GAS FLARING INCIDENT REPORT
December 2004
Page 1
Unplanned Events less than or equal to 1 hour
12/11/2004
12/15/2004
0501-0505
2252-2258
60 Not required for unplanned events which
479 are less than or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
539
12/11/2004
1212612004
0530-0851
0646-0954
280 See attachments
9
See attachments
TOTAL
289
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
12125/2004 0901·0920
362 See attachments
See attachments
TOTAL
362
1~~~,~,~ed"~~~~~~"~XC~~~,i"~,~",,,,~,.,~,~,~,r,,,,<:>,~ ,~~,~~e~i,~~,~O~O",,~,~f I
>;;::d;W:~~1I1,ªi;;;iW;>':"/"'il!M,ª!%;!%,;/;;>::dri>!%¡Wm~~!;i,ªf~§;;W¡;'mf~,ª~!1!I~lgtif;,g~fltif(f;'~e~fJ$:d(f;I§I~lædid';f»>!%rF;;""»i@~(f;:n~rI!dtfll~e~Hm~i'e!#'MI~ltfllæd~I§I~I$'¡iF""
See attachments See attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
539
289
362
o
29,685
1/10/2005
3:32 PM
REPORT NO: 04-0549
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 11 Dee 2004
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
05:01 05:05 o Hrs 4Mins ~ D D 60 MSCF
05:30 08:51 3Hrs 21 Mins ~ D D 280 MSCF
TOTAL VOLUME 340 MSCF
First Determination of Cause:
1. 1804 TIC shut down for unknown cause.
2. Seven attempted starts on 18Ø4 TIC. Instrumentation group trouble shooting start up failure
problems.
Action Taken to Stop Flaring:
1. 7C/15C shut in on high pressure immediately. This common line has more gas through it than what
1804 TIC compresses; so there was no flaring other than the shut down depressurization.
2. Removed a timer and reset on the 1804 T/C start-up sequence. Started 1804 T/C.
Tuesday, December 21, 2004
Page 1 of 1
REPORT NO: 04-0571
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 25 Dee 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/ReliefValve 09:01 09:20 GHrs 19Mins ~ D ~ 362 MSCF
TOTAL VOLUME
362 MSCF
First Determination of Cause:
1. Attempts to light HP/IP 4th Stage Flare Pilots. Vented slip stream of gas from Slug Catchers to
HP/IP Flare System.
Action Taken to Stop Flaring:
1. Discontinued slip stream of gas to Flare System after partial success at igniting HP/IP 4th Stage
Flare Pilots.
Tuesday, December 28. 2004
Page 1 of 1
REPORT NO: 04-0572
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 26 Dee 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/ReliefValve 06:46 09:54 3Hrs 8Mins ~ D D 9 MSCF
TOTAL VOLUME
9 MSCF
First Determination of Cause:
1. Production cuts due to ALPS Proration may have resulted in intermittent pressure excursions due to
abnormal equipment operations.
(HP Operational Flare Meter 355)
Action Taken to Stop Flaring:
1. Completed Production cuts and stabilized equipment operations.
Tuesday, December 28,2004
Page 1 of 1