FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) MonthlYear of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 01/2004
GATHERING CENTER 1
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 2,219
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 39,761
6. Used for lease operations Fuel 885,271
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 927,251
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 73,818,555
Remarks:
I hereby certi7J~at the tegOing ~true and correct to the best of my knowledge.
Signature: Q _ .A .A AA J1. Title: SUPERVISOR
- ,
Form 10 422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 MC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS FLARING INCIDENT REPORT
January 2004
1/14/2004
1/19/2004
1/25/2004
1/26/2004
1/28/2004
2230-2251
0139-0146
2236-2247
1530-1539
0305-0321
TOTAL
58 Not required for unplanned events which
19 are less than or equal to 1 hour
378
764
1,000
2,219
Unplanned Events greater than 1 hour
TOTAL
See attachments
o
Planned Events Less Than or Equal 1 Hour AND Not Exceedin 5000 Mct
TOTAL
See attachments
o
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mct
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
See attachments
o
o
o
o
41,980
Page 1
Not required for unplanned events which
are less than or equal to 1 hour
See attachments
See attachments
See attachments
2/6/2004
4:00 PM
Planned GPB Flaring Event
To: Steve McMains, AOGCC
steve mcmains@admin.state.ak.us
907-793-1241, fax 907-276-7542
From: Michael Bolkovatz, GPB Prod Optim Team Leader, 907-659-4472 or
907-659-5566
A planned flaring event will occur at GC1 this week. We are in
the process of starting up a new 36" line between pt Macintyre and GC1 as
part of the waterwheel project. We will be warming the line up with gas
prior to introducing liquids into the line. Once the line is warmed up,
we will depressure it back to -150 psig through a slugcatcher at GC1. We
will then have to fully depressure the line to atmosphere in order to
safely pull the final blinds to put the line in service. We have
calculated that this flared volume will be approximately 4 MMSCF. I will
send a follow up email with the actual volume flared after the event.
Please call or email if you need additional clarification.
Thank you,
Michael Bolkovatz
Greater Prudhoe Bay Production Optimization Team Leader
1 of 1
1/26/2004 7 :22 AM
RE: Planned GPB Flaring Event
Steve,
We will not be flaring per the note below. GC1 Operations
determined a safe way to remove the blinds without depressuring to
atmosphere.
Mike
To:
Steve McMains, AOGCC
steve mcmains@admin.state.ak.us
.._-_.__.._-_..._--_.._---_..._-_.~_.._----_._._-
907-793-1241, fax 907-276-7542
From:
907-659-5566
Michael Bolkovatz, GPB Prod Optim Team Leader, 907-659-4472 or
A planned flaring event w'ill occur at GC1 this week. We are in the
process of starting up a new 36" line between pt Macintyre and GC1 as part of
the waterwheel project. We will be warming the line up with gas prior to
introducing liquids into the line. Once the line is warmed up, we will
depressure it back to -150 psig through a slugcatcher at GC1. We will then have
to fully depressure the line to atmosphere in order to safely pull the final
blinds to put the line in service. We have calculated that this flared volume
will be approximately 4 MMSCF. I will send a follow up email with the actual
volume flared after the event.
Please call or email if you need additional clarification.
Thank you,
Michael Bolkovatz
Greater Prudhoe Bay production Optimization Team Leader
1 of 1
1/28/2004 7:47 AM
..
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) MonthlYear of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 02/2004
GATHERING CENTER 1
Disposition Volume MCF"
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 3,827
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 37,422
6. Used for lease operations Fuel 936,628
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 977,877
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 69,521,112
Remarks:
I hereby ce12 that th~Oreg~e and correct to the best of my knowledge.
Signature: .Q. .,(A Title: SUPERVISOR
Form 10-422 (Revised 4/95)
"Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS FLARING INCIDENT REPORT
February 2004
Page 1
~Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
2/16/2004 0500-0506 417 Not required for unplanned events which
2/23/2004 0237-0243 417 are less than or equal to 1 hour
2/24/2004 0220-0226 417
2/28/2004 1016-1027 382
2/28/2004 2205-2232 2,194
TOTAL 3,827
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
~Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL
o
Jplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL 0
Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL 0
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
o
o
o
TOTAL FLARED VOLUME
41 ,249
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
3/5/2004
2:10 PM
Facility
GATHERING CENTER 1
Disposition
1. Sold
2. Reinjected
3. Flared or vented less than 1 hour.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) MonthlYear of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 03/2004
Volume MCF"
o
o
3,731
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge
6. Used for lease operations
7. Other
TOTAL items 1 - 7
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to: CCP
Remarks:
o
39,313
Fuel
Assist
1,025,459
o
Lift Gas, Off Field
o
1,068,503
o
o
o
73,818,606
I hereby ce~ ~t tl)e foregoinR is true and correct to the best of my knowledge.
Signature: tJ.l J ~ ~ /I AA !/11 Title: SUPERVISOR
Form 10-422 (Revised 4/95)
"Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS FLARING INCIDENT REPORT
March 2004
Page 1
~Unplanned Events less than or equal to 1 hour
DATE . TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
3/2/2004 1749-1758 113 Not required for unplanned events which
3/3/2004 0804-0818 243 are less than or equal to 1 hour
3/3/2004 1919-1929 347
3/12/2004 1601-1611 694
3/13/2004 1728-1742 972
3/20/2004 0356-0404 49
3/20/2004 0905-0959 1,313
TOTAL
3,731
~Unplanned Events greater than 1 hour
DATE TIME VOLUME
DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL
o
~Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL 0
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL 0
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
3,731
o
o
o
TOTAL FLARED VOLUME
43,044
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
4/8/2004
3:11 PM
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 04/2004
GATHERING CENTER 1
Disposition Volume MCF"
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 360
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 37,453
6. Used for lease operations Fuel 1,010,886
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 1,048,699
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 69,205,887
Remarks:
I hereby certìfnhDe Rregoin9 ~ true and correct to the best of my knowledge.
Signature: , J A AA J 1 Title: SUPERVISOR
Form 10-422 (Revised 4/95)
"Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS FLARING INCIDENT REPORT
April 2004
Page 1
IUnplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
4/27/2004 0419-0433 263 Not required for unplanned events which
4/30/2004 0419-0433 97 are less than or equal to 1 hour
TOTAL
360
~Unplanned Events greater than 1 hour
DATE TIME VOLUME
DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL
o
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE . TIME ... VOLUME DESCRIPTION OF INCIDENT & CAUSE .
See attachments
TOTAL 0
~Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OFINCIDENT & CAUSE
See attachments
TOTAL 0
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5.000 MCF
Pilot Purge
Assist
TOTAL
360
o
o
o
TOTAL FLARED VOLUME
37,813
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
5/11/2004
1 :33 PM
,
STATE OF ALASKA
ALASKA Oil AND GAS CONSERVATION COMMISSION
FACiliTY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000031
2. Facility Name
PBU GC 1
Disposition
3. Field
PBU - WOA
Volume MCF
4. Operator
5. Month/Year of Disposition
BP Ma -2004
20. For production from multiple pools. list contribution of each pool as a percent of
Total Volume.
6. Sold
o
Pool Name
PRUDHOE
Pool Code
640150
Percent
100.00%
7. Reinjected
o
8. Flared or vented 1 hour or less
12,837
9. Flared or vented more than 1 hour (see instr.)
o
10. Pilot and Purge
38,009
11. Used for lease operations (specify in Remarks)
984,171
12. Other (see instructions)
o
Authorization> 1 hr:
Safety
MCF
13. TOTAL VOLUME (ITEMS 6-12)
1,035,017
Lease Use
MCF
14. NGL Gas Equivalent
o
Conservation
MCF
15. Purchased gas
o
Waste:
MCF
16. Transferred from:
o
17. Transferred to: (Express as a negative #) CCP
-69,408,015
Commissioner
Date
18. Remarks: Block II: Fuel Gas = 984,171 mscf and Assist Gas = 0 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
S;g,,_re Q G. flu.~ ""
Printed Name
Robert A. Re nolds
Phone (907)564-5028
Date Co
Form 10-422 Rev. 1/2004
Submit in Duplicate
...
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS FLARING INCIDENT REPORT
May 2004
IUnplanned Events less than or equal to 1 hour
. DATE . TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
5/6/2004 0715-0745 5,208 Not required for unplanned events which
5/8/2004 2054-2059 174 are less than or equal to 1 hour
5/9/2004 1611-1652 1 ,424
5/14/2004 0851-0857 208
5/17/2004 1426-1450 2,083
5/22/2004 0614-0702 3,667
5/22/2004 0729-0736 73
Page 1
TOTAL
12,837
~Unplanned Events greater than 1 hour
DATE . . TIME VOLUME
DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL
o
~Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE·
See attachments
TOTAL 0
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Iplanned Events Exceeding 1 Hour OR Exceedin~ 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL 0
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
12,837
o
o
o
50,846
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
6/4/2004
9:54 AM
,.
".
STATE OF ALASKA
ALASKA Oil AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000031
2. Facility Name
PBU GC 1
Disposition
3. Field
PBU - WOA
Volume MCF
4. Operator 5. Month/Year of Disposition
BP June-2004
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
o
Pool Name
PRUDHOE
Pool Code
640150
Percent
100.00%
7. Reinjected
o
8. Flared or vented 1 hour or less
3,881
9. Flared or vented more than 1 hour (see instr.)
o
10. Pilot and Purge
36,703
11. Used for lease operations (specify in Remarks)
905,070
12. Other (see instructions)
o
14. NGL Gas Equivalent
o
Authorization> 1 hr: MCF
Safety
MCF
Lease Use
MCF
Conservation
Waste: MCF
Commissioner Date
13. TOTAL VOLUME (ITEMS 6-12)
945,654
15. Purchased gas
o
16. Transferred from:
o
17. Transferred to: (Express as a negative #) CCP
-63,432,432
18. Remarks: Block 11: Fuel Gas = 905,070 rosef and Assist Gas = 0 rosef
Ihoæ:;:::]rQ~g 1:::"];"_01 m,~_
Title
Date
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Au h rit 0 5.2
Printed Name
Robert A. Re nolds
Phone (907)564-5028
Form 10-422 Rev. 1/2004
Submit in Duplicate
,.'
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS FLARING INCIDENT REPORT
June 2004
~~~PI~nn~~~v~~ts less...th~n ~re9ua.l. t~ 1.hour
·DA;¡¡I;"·,J;IMI;· ···iV()!l,(iME· ·ºI;~Ç.@!!?T.I()~I;;()f''lNºIQr;NT'~øAU$E .
6/7/2004 1416-1452 500 Not required for unplanned events which
6/18/2004 2347-2400 208 are less than or equal to 1 hour
6/17/2004 0000-0004 75
6/23/2004 1643-1705 504
6/23/2004 2229-2237 111
6/24/2004 0305-0322 354
6/24/2004 0433-0439 83
6/25/2004 0030-0100 417
6/26/2004 0008-0019 229
6/26/2004 0521-0549 914
6/26/2004 2135-2210 486
Page 1
TOTAL
3,881
IUnplanned Events greater than 1 hour
.. . DATE . . TIME.··· . VOLUME.· DESCRIPTION.OFINCIDENT&CAU5E
See attachments
TOTAL
o
J
~Planned Events Less Than or Equal 1 Hour AND Not Exceedin~ 5000 Mcf
···DATE···· .. . TIME. . . . VOLUME .... DESCR~P110r-¡OFINCDeN".&CAUSE .....
See attachments
TOTAL
o
. ~
~Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
. ······DATE .,'..·········.'.TIME ,... . . ., ,.. V9LUMEDt:;SCRIPTI0~OFINCIDENT &CAUSt:;·, ..
See attachments
TOTAL 0
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour 0
Planned Events < 1 hour and not 0
exceeding 5,000 MCF
Planned Events> 1 hour or 0
exceeding 5.000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME 40.584
AºTIºN;;J;A>~~J;º!r;!l,IMI1'\IA>Tr;"CAtI~E····
Not required for unplanned events which
are less than or equal to 1 hour
ACIIONTAKENTO ELIMINATE CAUSE·
See attachments
. ACTlONTAJŒNTOELlMINA'TECAOSe .. .
See attachments
.. .. ... ACT.IONTAKENTO ELIMINATE ÇAUSE.. .
See attachments
.~
7/6/2004
1:21 PM
-
STATE OF ALASKA
ALASKA Oil AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000031
2. Facility Name
PBU GC 1
Disposition
3. Field
PBU - WOA
Volume MCF
4. Operator
5. Month/Year of Disposition
BP Jul -2004
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
o
Pool Name
PRUDHOE
Pool Code
640150
Percent
100.00%
7. Reinjected
o
8. Flared or vented 1 hour or less
5,212
9. Flared or vented more than 1 hour (see Instr.)
o
10. Pilot and Purge
37,756
11. Used for lease operations (specify in Remarks)
939,010
12. Other (see instructions)
o
Authorization> 1 hr:
Safety
MCF
13. TOTAL VOLUME (ITEMS 6-12)
981,978
Lease Use
MCF
14. NGL Gas Equivalent
o
Conservation
MCF
15. Purchased gas
o
Waste:
MCF
16. Transferred from:
o
17. Transferred to: (Express as a negative #) CCP
-62,924,417
Commissioner
Date
18. Remarks: Block 11: Fuel Gas = 939,010 mscf and Assist Gas = 0 mscf
I hereby certify that the foregoing is rue and correct to the best of my knowledge.
(2.
Signature
Title
Date
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authorit 20 AAC25.235.
Printed Name
Robert A. Re nolds
Phone (907)564-5028
Form 10-422 Rev. 1/2004
Submit in Duplicate
.-
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS FLARING INCIDENT REPORT
July 2004
¡unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
7/6/2004 0249-0307 138 Not required for unplanned events which
7/8/2004 0923-0950 356 are less than or equal to 1 hour
7/14/2004 2212-2239 1,463
7/20/2004 1129-1221 542
7/20/2004 1710-1734 133
7/23/2004 1504-1523 264
7/23/2004 1754-1800 171
7/24/2004 1030-1039 125
7/29/2004 1711-1735 333
7/30/2004 1203-1259 958
7/30/2004 1631-1706 729
TOTAL 5,212
Page 1
~Unplanned Events greater than 1 hour
DATE . TIME VOLUME
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL
o
~Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Met
DATE TIME VOLUME DESORIPT,ON OF INCiDENT & CAUSE
See attachments
TOTAL
o
¡Planned Events Exeeedin~ 1 Hour OR Exeeedin~ 5000 Met
DATE TIME VOLUME. DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL 0
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour 0
Planned Events < 1 hour and not 0
exceeding 5,000 MCF
Planned Events> 1 hour or 0
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME 42,968
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKENTO ELIMINATE CAUSE
See attachments
8/9/2004
9:29 AM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000031
2. Facility Name
PBU GC 1
Disposition
3. Field
PBU - WOA
Volume MCF
4. Operator 5. MonthNear of Disposition
BP Au ust-2004
20, For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
o
Pool Name
PRUDHOE
Pool Code
640150
Percent
100.00%
7. Reinjected
o
8. Flared or vented 1 hour or less
9,359
9. Flared or vented more than 1 hour (see instr.)
o
10. Pilot and Purge
41,010
11. Used for lease operations (specify in Remarks)
767,932
12. Other (see instructions)
o
Authorization >1 hr:
Safety
MCF
13. TOTAL VOLUME (ITEMS 6-12)
818,301
MCF
Lease Use
14. NGL Gas Equivalent
o
Conservation
MCF
15. Purchased gas
o
Waste:
MCF
16. Transferred from:
o
17. Transferred to: (Express as a negative #) CCP
-58,149,399
Commissioner
Date
18. Remarks: Block II: Fuel Gas = 767,932 mscf and Assist Gas = 0 mscf
I hereby certify that the foregoin
Signature Q~ o.
Title
Date
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authorit 20 AAC2 .235.
Printed Name
Robert A. Re nolds
Phone (907)564-5028
Form 10-422 Rev. 1/2004
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS FLARING INCIDENT REPORT
August 2004
Page 1
lunPlanned Events less than or equal to 1 hour
',;;;j:!i?:l¥iIi§!Fnn"··· ... ...... ····""j:F;1JI\I!§@FY;:········· . ·"'j:j::\(;º,J;.¡I¡1;I\I!§FY· ·!i?:§~,ª6~~iIi~º,fìlj:º,I7j:.fìI,ª'!i?:§fìlilij:~I.?l¥IiJ$§;;;'
8/4/2004 1630-1641 458 Not required for unplanned events which
8/7/2004 1218-1234 278 are less than or equal to 1 hour
8/9/2004 1 033-1 051 250
8/11/2004 1107-1128 248
8/20/2004 0658-0732 5,903
8/31/2004 0955-1011 2,222
TOTAL
9,359
lunplanned Events greater than 1 hour
DATE < . TIME . . . VOLUME . DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL
o
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
See attachments
TOTAL
o
Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
.... .... DATE.·· ... ... ..... .·TIME ,.,. . . VPLUMJ: ·'·DJ:SCRIPTIONOFJNCIDENT& Cl¥USE.· ..
See attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
o
o
o
TOTAL FLARED VOLUME
50,369
ACTIOfìlTAKENTO ELIMJNATE CAUSE. .
Not required for unplanned events which
are less than or equal to 1 hour
··ACTtONTAKENTO EL!MINATECA.USE··
See attachments
See attachments
. ACTION TAKEN TOELlMINA.TECAUSE . '.. .
See attachments
9/3/2004
9:27 AM
STATE OF ALASKA
ALASKA Oil AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000031
2. Facility Name
PBU GC 1
Disposition
3, Field
PBU - WOA
Volume MCF
6. Sold
o
7. Reinjected
o
8. Flared or vented 1 hour or less
11,378
9. Flared or vented more than 1 hour (see instr,)
12,309
10. Pilot and Purge
42,021
11. Used for lease operations (specify in Remarks)
841,604
12. Other (see instructions)
o
13. TOTAL VOLUME (ITEMS 6-12)
907,312
14. NGL Gas Equivalent
o
15. Purchased gas
o
16. Transferred from:
o
17. Transferred to: (Express as a negative #) CCP
-48,534,682
18. Remarks: Block 11: Fuel Gas = 841,604 mscf and Assist Gas = 0 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature t~-v~~ ~
I
4. Operator 5. Month/Year of Disposition
BP Se tember-2004
20. For production from multiple pools. list contribution of each pool as a percent of
Total Volume.
Pool Name
PRUDHOE
Pool Code
640150
Percent
100.00%
Printed Name
Robert A. Re nolds
Phone (907)564-5028
Title Mana er, State Taxes and Ro alt
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authorit 20 AAC25.235.
Form 10-422 Rev. 1/2004
Date l.tJ .-( ,
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT· GC-1
GAS FLARING INCIDENT REPORT
September 2004
Page 1
~Unplanned Events less than or equal to 1 hour
. . DATE .. ·.TIME . ··.YOLUME ...... DESCRIPTION OF INCIDENT & CAUSE .. ..
9/3/2004 1912-1920 56 Not required for unplanned events which
9/4/2004 1621-1624 42 are less than or equal to 1 hour
9/7/2004 0602-0605 208
9/14/2004 1628-1702 4,722
9/14/2004 2330-2353 479
9/27/2004 2119-2211 5,000
9/29/2004 1111-1545 871
TOTAL 11,378
. ACTION TAKEN TO ELIMINATE CAUSE.
Not required for unplanned events which
are less than or equal to 1 hour
~Unplanned Events ~reater than 1 hour
.. . DATE ... ..... .' TIME·.. ..... .. VOL\JME.· .... DESCRIPTION OF INCIDENT & CAUSE .. .
9/10/2004 1341-2015 899 See attachments
9/11/2004 1633-2100 927
9/12/2004 0156-2359 3,675
9/13/2004 1706-2359 717
9/14/2004 0000-0400 417
9/24/2004 0825-1630 674
9/28/2004 1900-2400 5,000
... .. ACTION TAKEN TO i:lIMINATE CAUSE·
See attachments
TOTAL
12,309
~Planned Events Less Than or Equal 1 Hour AND Not ExeeedinQ 5000 Met
DATE.· ··...TIME . VOLUME DESbRIPTlONOFINCIDENT&CAÛSE·
See attachments
·.ACTiON TAKEN TO ELIMINATE. CAU.SE.
See attachments
TOTAL
o
~Planned Events Exeeedin~ 1 Hour OR Exeeedin~ 5000 Met
... . DATIL ... .... .···.·.TIME .. ..... ... .·.·..YOLUME. .·.DESCRIPTlONOF INCIDENT.&.CAUSE. ........ ... ..... . ACTlONTAKEN.TO EUMINATE CAUSE..· ...
See attachments See attachments
TOTAL 0
Unplanned Events < 1 Hour 11,378
Unplanned Events> 1 Hour 12,309
Planned Events < 1 hour and not 0
exceeding 5,000 MCF
Planned Events> 1 hour or 0
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
65,708
1 0/5/2004
2:55 PM
REPORT NO: 04-0420
SPXA FLARE REPORT
PRUDHOE SAY
FACILITY: GC1
DATE: 10 Sep 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 13:41 20:15 4Hrs 19Mins 0 ~ 0 899 MSCF
TOTAL VOLUME
899 MSCF
First Determination of Cause:
1. In the process of restaring the GC, the LP and IP compressors were having trouble staying LOADED.
Action Taken to Stop Flaring:
1. Assist gas was added to prevent black smoke, LP and IP compressors LOADED.
Monday, September 27, 2004
Page 1 of 1
bp
REPORT NO: 04-0425
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC1
DATE: 11 Sep 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. FlarelRelief Valve 16:33 21 :00 4 Hrs 27 Mins 0 0 0 927 MSCF
TOTAL VOLUME
927 MSCF
First Determination of Cause:
1. The GC shutdown on appears to be FALSE, master gas shutdown. All gas compressors shutdown,
resulting in flaring.
Action Taken to Stop Flaring:
1. The GC slowly stopped depressuring to flare.
Monday, September 27, 2004
Page 1 of 1
bp
REPORT NO: 04-0428
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC1
DATE: 12 Sep 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 01 :56 23:59 22 Hrs 3 Mins ~ 0 0 3,675 MSCF
TOTAL VOLUME 3,675 MSCF
First Determination of Cause:
1. LP compressor would not load with low gas rates, while troubleshooting bogus plant shutdown.
Action Taken to Stop Flaring:
1. Assit gas on, to prevent black smoke.
Monday, September 27, 2004
Page 1 of 1
REPORT NO: 04-0432
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC1
DATE: 13 Sep 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 17:06 23:59 6 Hrs 53 Mins 0 0 0 717 MSCF
TOTAL VOLUME
717 MSCF
First Determination of Cause:
1. GC-1 shutdown again, due to a bogus fire alarm in skid 494, maybe.
Action Taken to Stop Flaring:
1. Assist gas on, to prevent black smoke.
Monday, September 27, 2004
Page 1 of 1
REPORT NO: 04-0437
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC1 DATE: 14 Sep 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 00:00 04:00 4Hrs o Mins 0 0 0 417 MSCF
2. Flare/Relief Valve 16:28 17:02 OHrs 34 Mins 0 0 0 4,722 MSCF
3. Flare/Relief Valve 23:30 23:53 OHrs 23 Mins 0 0 0 479 MSCF
TOTAL VOLUME 5,618 MSCF
First Determination of Cause:
1. GC in process of starting up, LP and IP compressors not loading, due to lack of gas.
2. High gas transit line pressure caused by CGF compressor problems due to electrical power loss
3. North Star compressor shutdown.
Action Taken to Stop Flaring:
1. Introduced enough gas to plant for compressors to load up. Flaring stopped. Assit gas added to
prevent black smoke.
2. WOA reduced production rates and shut-in 12 wells equaling 280 mmscfd. EOA reduced production
rates and shut-in 9 wells equaling 350 mmscfd. Wells were shut-in or choked back starting at 1630
hours.
3. WOA reduced production rates and shut-in 7 wells equaling 100 mmscfd. Wells were shut-in or
choked back starting at 2329 hours.
Monday, September 27, 2004
Page 1 of 1
REPORT NO: 04-0457
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC1
DATE: 24 Sep 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 08:25 16:30 8 Hrs 5 Mins ~ 0 0 674 MSCF
TOTAL VOLUME
674 MSCF
First Determination of Cause:
1. Lost C-S/C due to automation problem. Intermittent flaring during day due to trouble-shooting.
Action Taken to Stop Flaring:
1. Flaring was permitted to continue while GC operations personnel attempted to restart the equipment.
Monday, September 27, 2004
Page 1 of 1
REPORT NO: 04-0470
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC1
DATE: 28 Sep 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 19:00 24:00 5 Hrs 0 Mins 0 0 0 5,000 MSCF
TOTAL VOLUME 5,000 MSCF
First Determination of Cause:
1. C-slugcatcher shutdown followed by A-slugcatcher and GHX Annex causing low gas rates to Sk18
compressors. Assist gas was added to prevent black smoke.
Action Taken to Stop Flaring:
1. Returned banks to normal
Thursday, September 30, 2004
Page 1 of 1
STATE OF ALASKA
ALASKA Oil AND GAS CONSERVATION COMMISSION
FACiliTY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000031
2. Facility Name
PBU GC 1
Disposition
3. Field
PBU - WOA
Volume MCF
6. Sold
o
7. Reinjected
o
8. Flared or vented 1 hour or less
1,252
9. Flared or vented more than 1 hour (see instr.)
816
10. Pilot and Purge
43,519
11. Used for lease operations (specify in Remarks)
881,894
12. Other (see instructions)
o
13. TOTAL VOLUME (ITEMS 6-12)
927,481
14. NGL Gas Equivalent
o
15. Purchased gas
o
16. Transferred from:
o
17. Transferred to: (Express as a negative #) CGF
-65,725,459
18. Remarks: Block 11: Fuel Gas = 881,894 mscf and Assist Gas = 0 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Sig""m~~ ~
Printed Name: Bernard W. a'n
4. Operator 5. Month/Year of Disposition
BP October-2004
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
Pool Name
PRUDHOE
MIDNIGHT SUN
PT MCINTYRE
Pool Code
640150
640158
640180
Percent
98.16%
0.70%
1.14%
JBIl-
Phone (907)564-5028
Title Mana er, Production Taxes and Ro alt
Date ll-\
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authorit 20 AAC25.23 .
Form 10-422 Rev. 1/2004
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS FLARING INCIDENT REPORT
October 2004
Page 1
lunplanned Events less than or equal to 1 hour
. vn7'º~~§WW"········ . ····,:'vv'5~I!\I!I§yti:v' ... ··v<55iW~~!4ºiMl;v55VWºI;~~ª~t:;>;¡~~~l!~i¡~§it~i~(º§tl'~i~v~~º$1;57'57'V····
10/6/2004 1730-1746 289 Not required for unplanned events which
10/13/2004 0408-0419 206 are less than or equal to 1 hour
10/13/2004 1339-1354 677
10/18/2004 2239-2252 36
10/24/2004 1629-1636 44
ACTION TAKE~TOEL!MINATEC~USE .... . .
Not required for unplanned events which
are less than or equal to 1 hour
J
TOTAL
1,252
1 0/28/2004 1405-1800
816 See attachments
See attachments
TOTAL
816
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
See attachments
See attachments
TOTAL
o
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
See attachments
See attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
816
o
o
45,587
11/9/2004
10:20 AM
REPORT NO: 04-0520
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC1
DATE: 28 Oct 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 14:05 18:00 3 Hrs 55 Mins 0 0 0 816 MSCF
TOTAL VOLUME
816 MSCF
First Determination of Cause:
1. K-105 and K-106 SID due to power supply problem. Assist gas was added to minimize opacity
Action Taken to Stop Flaring:
1. GC-1 SID flareing stopped
Sunday, October 31,2004
Page 1 of 1
.,.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000031
2. Facility Name
PBU GC 1
Disposition
3. Field
PBU - WOA
Volume MCF
6. Sold
o
7. Reinjected
o
8. Flared or vented 1 hour or less
12,738
9. Flared or vented more than 1 hour (see instr.)
13,542
10. Pilot and Purge
44,259
11. Used for lease operations (specify in Remarks)
1,018,349
12. Other (see instructions)
o
13. TOTAL VOLUME (ITEMS 6-12)
1,088,888
14. NGL Gas Equivalent
o
15. Purchased gas
o
16. Transferred from:
o
17. Transferred to: (Express as a negative #) CGF
-70,544,255
18. Remarks: Block 11: Fuel Gas = 1,018,349 mscf and Assist Gas = ° mscf
rrect to the best of my knowledge.
4. Operator 5. Month/Year of Disposition
BP November-2004
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
Pool Name
PRUDHOE
LISBURNE
MIDNIGHT SUN
Pool Code
640150
640144
640158
Percent
98.41 %
0.06%
0.73%
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Auth rit 20 AAC 5. 35.
Title Mana er, Production Taxes and Ro alt
Signature
Printed Name
Form 10-422 Rev. 1/2004
Phone (907)564-5028 Date
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS FLARING INCIDENT REPORT
November 2004
Page 1
Unplanned Events less than or equal to 1 hour
11/7/2004
11/16/2004
11/23/2004
11/28/2004
11/28/2004
11/30/2004
1216-1310
1146-1152
2001-2006
0830-0910
1329-1349
2252-2257
TOTAL
8,438 Not required for unplanned events which
46 are less than or equal to 1 hour
52
2,778
1,389
35
12,738
Not required for unplanned events which
are less than or equal to 1 hour
11/3/2004
0401-0506
TOTAL
13,542 See attachments
See attachments
13,542
Planned Events Less Than or Equal 1 Hour AND Not Exeeedin
TOTAL
See attachments
See attachments
o
~Planned Events Exceedin~.1 Hour OR Exeeedin~ 5000 Mef
... .. ·J:)ATI; > > TIME > YOLlIMEDESC~fPTfONºF INPfDENT 8t CAliSE·. > .. .. .
See attachments
. ···AÇTlONTAKENTOE1..IMINATEPAU$E> . ..
See attachments
TOTAL 0
TOTAL FLARED VOLUME 70,539
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour 13,542
Planned Events < 1 hour and not 0
exceeding 5,000 MCF
Planned Events> 1 hour or 0
exceeding 5,000 MCF
Pilot Purge
Assist
12/6/2004
4:01 PM
REPORT NO: 04-0524
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC1
DATE: 03 Nov 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 04:01 05:06 1 Hrs 5 Mins 0 0 0 13,542 MSCF
TOTAL VOLUME 13,542 MSCF
First Determination of Cause:
1. High gas transit line pressure caused by CGF compressor problems due to booster shut down.
Action Taken to Stop Flaring:
1. WOA reduced production rates and shut-in 21 wells equaling 450 mmscfd. EOA reduced production
rates and shut-in 15 wells equaling 350 mmscfd. Wells were shut-in or choked back starting at 0405
hours.
Monday, November 22, 2004
Page 1 of 1
\
STATE OF ALASKA
ALASKA Oil AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000031
2. Facility Name
PBU GC 1
Disposition
3. Field
PBU - WOA
Volume MCF
4. Operator 5. MonthlYear of Disposition
BP Decembe~2004
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
°
Pool Name
PRUDHOE
LISBURNE
MIDNIGHT SUN
Pool Code
640150
640144
640158
Percent
97.86%
0.00%
1.22%
7. Reinjected
o
8. Flared or vented 1 hour or less
3,993
9. Flared or vented more than 1 hour (see instr.)
o
10. Pilot and Purge
45,190
11. Used for lease operations (specify in Remarks)
1 ,034,071
12. Other (see instructions)
o
Authorization> 1 hr:
Safety
13. TOTAL VOLUME (ITEMS 6-12)
1,083,254
MCF
Lease Use
14. NGL Gas Equivalent
o
Conservation
MCF
15. Purchased gas
o
Waste:
MCF
16. Transferred from:
o
17. Transferred to: (Express as a negative it) CGF
-73,735,574
Commissioner
Date
18. Remarks: Block 11: Fuel Gas = 1,034,071 roscf and Assist Gas = ° rosef
Signature
Title Mana er, Production Taxes and Ro alt
I hereby certify that the foregoing is true and correct to the st of my knowledge.
'1
Printed Name
Phone (907)564-5028
Date . -/'/-Ô S-
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authorit 20 C25. 5.
Form 10-422 Rev. 1/2004
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS FLARING INCIDENT REPORT
December 2004
Page 1
Unplanned Events less than or equal to 1 hour
12/15/2004
12/15/2004
12/29/2004
12/30/2004
12/31/2004
0410-0438
2252-2316
1551-1558
0404-0414
0421-0426
389 Not required for unplanned events which
2,500 are less than or equal to 1 hour
486
326
292
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
3,993
See attachments
See attachments
TOTAL
o
Planned Events Less Than or Equal 1 Hour AND Not Exceedin
See attachments
See attachments
TOTAL
o
See attachments
See attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
o
o
o
TOTAL FLARED VOLUME