FACILITY: PBU GC 3
OPERATOR: BP EXPLORATION
Facility
GATHERING CENTER 3
Disposition
1. Sold
2. Reinjected
3. Flared or vented less than 1 hour.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 01/2004
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 MC 25.235)
5. Pilot and Purge
6. Used for lease operations
7. Other
TOTAL items 1 - 7
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to: CCP
Remarks:
Fuel
Assist
Lift Gas, Off Field
Signature:
Form 10-422 (Revised 4/95)
is true and correct to the best of my knowledge.
Title: SUPERVISOR
Volume MCF*
o
o
436
3,030
16,486
532,995
o
o
552,947
o
o
o
29,107,741
*Indicate contribution of each pool to total.
Pool Name
Code
Percent
PRUDHOE
640150
100.00%
1. Safety
3 1)30 MCF &r-
I
2. Lease Use
MCF
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
January 2004
Page 1
Unplanned Events less than or equal to 1 hour
1/6/2004
1/10/2004
1/27/2004
1/30/2004
1600-1700
0530-0537
1715-1722
1558-1603
TOTAL
179 Not required for unplanned events <= 1 hr
97
73
87
436
Not required for unplanned events which
are less than or equal to 1 hour
Unplanned Events greater than 1 hour
1/6/2004
1/6/2004
1/7/2002
1/8/2004
1700-2100
2100-2400
000-2400
0001-0455
600 See Attachments
275
1,800
355
See Attachments
TOTAL
3,030
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
See Attachments
See Attachments
TOTAL
o
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
See Attachments
See Attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
436
3,030
o
o
19,952
2/3/2004
11:04 AM
REPORT NO: 04-0005
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 06 Jan 2004
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
3. Flare/Relief Valve
TIME OF FLARING
Start Stop Duration
16:00 17:00 1 Hrs
17:00 21:00 4Hrs
21 :00 24:00 3 Hrs
Intermittent
OMins 0
OMins 0
o Mins 0
Black
Smoke Planned VOLUME
0 0 179 MSCF
0 0 600 MSCF
0 0 275 MSCF
TOTAL VOLUME t..054MSCF
First Determination of Cause:
1. K5500 wet gas compressor shut down for bundle replacement.
2. K5500 wet gas compressor shut down for bundle replacement.
3. K5500 wet gas compressor shut down for bundle replacement.
Action Taken to Stop Flaring:
1. No response taken as per procedure.
2. Reduced total water rate to 50 mbpd as per procedure. Water plant shut down to reduce flaring.
3. Due to -4 degree ambient, some high water cut HP wells still flowing for freeze protectiOn offlow
lines. A pad was shut down at 1904 hours and Field crew working to secure C pad for shut down.
Tuesday, January 20, 2004
Page 1 of 1
REPORT NO: 04-0006
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 07 Jan 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 00:00 24:00 24 Hrs OMins 0 0 0 1,800 MSCF
TOTAL VOLUME 1,800 MSCF
First Determination of Cause:
1. K5500 wet gas compressor shut down for bundle replacement.
Action Taken to Stop Flaring:
1. C pad was shut down at 0025 hrs. Only 4 high water cut HP wells flowing at this time for freeze
protect of flow lines. Total plant rate is at 300 mmscfd. Flare rate is 1.8 mmscfd.
Tuesday, January 20, 2004
Page 1 of 1
REPORT NO: 04-001 0
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 08 Jan 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 00:01 04:55 4 Hrs 44Mins 0 0 0 355 MSCF
TOTAL VOLUME
355 MSCF
First Determination of Cause:
1. K5500 wet gas compressor shut down for bundle replacement
Action Taken to Stop Flaring:
1. 0424 Hours, first attempt to started compressor failed. 0451 K-5500 started and back on-line. 0455
hours assit gas to flare closed, flare valve closed.
Tuesday, January 20, 2004
Page 1 of 1
GC3 K-5500 flaring event
To: Steve McMains, AOGCC
steve mcmains@admin.state.ak.us
907-793-1241, fax 907-276-7542
From: Michael Bolkovatz, GPB Prod Optim Team Leader,
907-659-5566 or 907-659-4472
GC3's K-5500 wet gas compressor is experiencing high vibrations,
and will have to be shutdown to repair/replace the compressor sometime in
the next two weeks. During this upcoming event, we plan to SI most of the
high pressure producing wells and cycle wells with high watercut to
prevent flow line freezing. Operationally, at this time of year, we have
chosen not to shut the entire plant down due to the substantial risks of
freezing (potential cracked lines resulting in spills, heat for personnel
safety, etc). It is expected that the repairs will last 24-48 hrs. This
complies with the SOP procedure for this machine. Once we have taken the
above steps to minimize flaring, the total flare rate will be roughly 2 -
2.5 MMSCFPD while the compressor is being repaired. I will follow up
with an email after the work is completed detailing the actual events.
Please call or email if you need.additional clarification.
Thank you,
Michael Bolkovatz
Greater Prudhoe Bay Production Optimization Team Leader
1 of 1
1/3/2004 10:23 AM
!W: GC3 K-5500 flaring event
To: Steve McMains, AOGCC
steve mcmains@admin.state.ak.us
907-793-1241, fax 907-276-7542
From: Hal Tucker, GPB Prod Optim Team Leader, 907-659-4472 or
907-659-5566
GC3's K5500 wet gas compressor was replaced on January 7. The operation
began at 1600 on January 6 and was completed at 0500 on January 8 when
the machine was loaded up and the flare valve closed. Total duration of
the flaring event was 36 hours and 55 minutes. 3,209 MSCF was flared
during the event.
Production was cut to minimize flaring per our procedure, with a minimal
amount of HP production remaining on to prevent flowline freezing. At the
24 hour threshold, it appeared that K5500 would be restarted within the
next several hours and, since the ambient temperature was still well
below 0, the decision was made to leave GC3 on line. K5500 restart was
delayed by 5 hours due to slide valve calibration problems. At 0424 on
January 8 the first K5500 restart was unsuccessfully attempted, with the
second and successful attempt occurring at 0451. K5500 was loaded up and
the flare valve closed at 0455 on January 8.
Please call or email if you need additional clarification.
Thank you,
Hal Tucker
Greater Prudhoe Bay production Optimization Team Leader
-----Original Message-----
From: GPB, Prod Opt TL
Sent: Saturday, January 03, 2004 9:45 AM
To: 'steve mcmains@admin.state.ak.us'
Cc: F:cë-aTër-;--AIïne-Mi--Benson;----Gary-A;- Pfeiffer, Jim A¡ GPB, Environ Advisor
West¡ GPB, Environ TL¡ GPB, Ops Mgr¡ Tucker, Hal E¡ GPB, GC3 TL
Subject: GC3 K-5500 flaring event
To: Steve McMains, AOGCC
steve mcmains@admin.state.ak.us
907-793-1241, fax 907-276-7542
From: Michael Bolkovatz, GPB Prod Optim Team Leader, 907-659-5566 or
907-659-4472
10f2
1/11/20048:11 AM
FW: GC3 K-5500 flaring event
~ .
GC3's K-5500 wet gas compressor is experiencing high vibrations, and will have
to be shutdown to repair/replace the compressor sometime in the next two weeks.
During this upcoming event, we plan to SI most of the high pressure producing
wells and cycle wells with high watercut to prevent flow line freezing.
Operationally, at this time of year, we have chosen not to shut the entire plant
down due to the substantial risks of freezing (potential cracked lines resulting
in spills, heat for personnel safety, etc). It is expected that the repairs will
last 24-48 hrs. This complies with the SOP procedure for this machine. Once we
have taken the above steps to minimize flaring, the total flare rate will be
roughly 2 - 2.5 MMSCFPD while the compressor is being repaired. I will follow
up with an email after the work is completed detailing the actual events.
please call or email if you need additional clarification.
Thank you,
Michael Bolkovatz
Greater Prudhoe Bay production Optimization Team Leader
20f2
1/11/20048:11 AM
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 02/2004
GATHERING CENTER 3
Disposition Volume MCF* <Indicate contribution of each pool to total.
1. Sold 0 Pool Name Code Percent
2. Reinjected 0 PRUDHOE 640150 100.00%
3. Flared or vented less than 1 hour. 7,311
4. Flared or vented greater than 1 hour 24,833 v
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 13,269
6. Used for lease operations Fuel 524,497
Assist 0
7. Other Lift Gas, Off Field 0 U :::E.i-'
TOTAL items 1 - 7 569,910 1. Safety 7Á¡~·33 MCF
8. NGL gas equivalent produced 0 2. Lease Use MCF
9. Purchased gas 0 3. Conserv. Purposes MCF
----- /7
10. Transferred from: 0 ! V)jf-/ ~ 4-!p!4-
l:Ccfn,mfs'sioner (
L Date
11. Transferred to: CCP 27,290,756
Note: All volumes must be corrected to pressure of 14.65
Remarks: psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
I hereby certify that thl foregoinÏS true and correct to the best of my knowledge. Authority 20 AAC 25.235.
Signature: O~ n . ..I ~...".. 1.1.. Title: SUPERVISOR
- I
Form 1 0 422 (Revised 4/95)
...J8,.e-
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT· GC-3
GAS FLARING INCIDENT REPORT
February 2004
Page 1
lunplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
2/3/2004 1629-1643 5,833 Not required for unplanned events <= 1 hr
2/28/2004 2200-2256 1,478
TOTAL
7,311
runplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
2/22/2004 1418-2200 5,500 See Attachments
2/22/2004 2200-2400 875
2/23/2004 0000-1000 3,125
2/23/2004 1000-2400 7,000
2/24/2004 0000-1640 8,333
TOTAL
24,833
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL
o
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
7,311
24,833
o
o
45,413
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
3/5/2004
2:10 PM
REPORT NO: 04~0058
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 22 Feb 2004
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke
14:18 22:00 7Hrs 42Mins 0 ~
22:00 24:00 2 Hrs 0 Mins D 0
Planned VOLUME
o 5,500 MSCF
o ·'6i''5°'·MSQf
TOTAL VOLUME 6,375 MSCF
First Determination of Cause:
1. K5500 Wet Gas Compressor shutdown due to mechanical problems
Assist gas added to prevent black smoke.
2. K5500 Wet Gas Compressor shutdown due to mechanical problems
Assist gas added to prevent black smoke.
Action Taken to Stop Flaring:
1. Shut-in constant purge to water tanks, blocked in failed rupture disk, minimized assist gas.
2. HP production shut-in
Monday, February 23, 2004
Page 1 of 1
REPORT NO: 04-0056
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 23 Feb 2004
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING
Start Stop Duration
00:00 10:00 10 Hrs
1'0:-00'24-:00 '14Hrs
Black
Intermittent Smoke
OMins 0 0
OMins'O 0
Planned
o
o
VOLUME
3,125·MSCF
7,OOO"MSGf
TOTAL VOLUME 1 0,125 MSCF
First Determination of 'Cause:
1. Sk-18 wet gas compressor shut down because of equipment failure
2. K5500 Wet Gas Compressor shutdown due to mechanical problems
Assist gas added to prevent black smoke.
J Action Taken to Stop Flaring:
1. WOA reduced production rates and shut-in
5 wells equaling 350 mmscfd. Wells were shut-in or choked back starting at 0000 hours.
2. Flaring continues due to low ambient temperature and inclimate weather. HP production has been
shut-in. Water tank purges minimized. Repaired flare sequence controller
Monday, March 01, 2004
Page 1 of 1
REPORT NO: 04-0059
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 24 Feb 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 00:00 16:40 16Hrs 40Mins 0 0 0 8,333 MSCF
TOTAL VOLUME "a~838'MSOF
First Determination of Cause:
1. K5500 Wet Gas Compressor shutdown due to mechanical problems
Assist gas added to prevent black smoke.
Action Taken to Stop Flaring:
1. Flaring continues due to low ambient temperature and inclimate weather. HP production has been
shut-in. Water tank purges minimized. Restarted compressor
Wednesday, February 25,2004
Page 1 of 1
GC3 K-5500 flaring event
To: Steve McMains, AOGCC
steve _ mcmains@admin.state.ak.us
907 -793-1241, fax 907-276-7542
From: Michael Bolkovatz, GPB Prod Optim Team Leader,
907-659-5566 or 907-659-4472
GC3's K-5500 wet gas compressor is experiencing high vibrations,
and will have to be shutdown to rebuild the compressor sometime
early next week. Since we do not have a spare compressor on the
Slope and one will not be available before we have to shut the
compressor down, we plan on rebuilding the existing compressor
on site. The job is expected to take 3-4 days to complete.
Operationally, at this time of year, we have chosen not to shut the
plant down due to the substantial risks of freezing (potential
cracked lines resulting in spills, heat for personnel safety, etc), but
we will make every attempt to minimize flaring while still complying
to the Title V air quality permit requirements. This complies with
the SOP procedure for this machine. I will follow up with an email
after the work is completed detailing the actual events.
Please call or email if you need additional clarification.
Thank you,
Michael Bolkovatz
Greater Prudhoe Bay Production Optimization Team Leader
1 of 1
2/22/2004 8:04 AM
RE: GC3 K-5500 flaring event
We have completed the rebuild on the K-5500 compressor and the machine is back online. The
operation began at 1418 hrs on February 22 and was completed at 1640 on February 24. Total
duration of the flaring event was 50 hours and 22 minutes. 24,833 MSCF was flared during the
event.
Production was cut to minimize flaring per our procedure, with a minimal amount of HP
production remaining on to prevent flowline freezing. We left the high water cut production
online to prevent freezing. Also, we added the minimum amount of assist gas to ensure
compliance with our Title V air quality permit.
Please call or email if you need additional clarification.
Michael Bolkovatz
-----Original Message-----
From: GPB, Prod Opt TL
Sent: Saturday, February 21, 2004 9:09 AM
To: 'steve_mcmains@admin.state.ak.us'; 'jim_regg@admin.state.ak.us'
Cc: Fiedler, Anne M; Benson, Gary A; pfeiffer, Jim A; GPB, Environ Advisor West; GPB, Environ TL;
GPB, Ops Mgr; Tucker, Hal E; GPB, GC3 TL
Subject:
GC3 K-5500 flaring event
To: Steve McMains, AOGCC
steve _mcmains@admin.state.ak.us
907 -793-1241, fax 907-276-7542
From: Michael Bolkovatz, GPB Prod Optim Team Leader,
907-659-5566 or 907-659-4472
GC3's K-5500 wet gas compressor is experiencing high
vibrations, and will have to be shutdown to rebuild the
compressor sometime early next week. Since we do not
10f2
2/25/2004 12:32 PM
RE: GC3 K-5500 flaring event
< 20f2
have a spare compressor on the Slope and one will not be
available before we have to shut the compressor down, we
plan on rebuilding the existing compressor on site. The job
is expected to take 3-4 days to complete. Operationally, at
this time of year, we have chosen not to shut the plant
down due to the substantial risks of freezing (potential
cracked lines resulting in spills, heat for personnel safety,
etc), but we will make every attempt to minimize flaring
while still complying to the Title V air quality permit
requirements. This complies with the SOP procedure for
this machine. I will follow up with an email after the work is
completed detailing the actual events.
Please call or email if you need additional clarification.
Thank you,
Michael Bolkovatz
Greater Prudhoe Bay Production Optimization Team Leader
2/25/2004 12:32 PM
¡
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 03/2004
GATHERING CENTER 3
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 4,089
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 16,593
6. Used for lease operations Fuel 569,544
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 590,226
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 30,114,208
Remarks:
I hereby ce" at t[fOregOi~ is true and correct to the best of my knowledge.
Signature: .Å .II "" gJ Title: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
.r
..
..
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
March 2004
lunplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
3/3/2004 0644-0728 1,222 Not required for unplanned events <= 1 hr
3/12/2004 1436-1441 42
3/19/2004 0845-0850 75
3/20/2004 0905-0954 2,500
3/21/2004 0614-0618 50
3/21/2004 1620-1648 200
Page 1
TOTAL
4,089
lunplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL
o
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL
o
JPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
4,089
o
o
o
20,682
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
4/8/2004
3:12 PM
,-{t1
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s)
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU
Month/Year of Disposition
04/2004
GATHERING CENTER 3
Disposition
1. Sold
2. Reinjected
3. Flared or vented less than 1 hour.
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge
6. Used for lease operations
Fuel
Assist
7. Other
Lift Gas, Off Field
TOTAL items 1 - 7
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to: CCP
Remarks:
Signature:
Form 10-422 (Revised 4/95)
Title: SUPERVISOR
Volume MCF*
o
o
150
3,242
16,213
534,884
o
o
554,489
o
o
o
28,049,270
'Indicate contribution of each pool to total.
Pool Name
Code
Percent
PRUDHOE
640150
100.00%
1. Safety
3Zet-z.-MCF ~
2. Lease Use
MCF
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
...
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC·3
GAS FLARING INCIDENT REPORT
April 2004
Page 1
lunPlanned Events less than or equal to 1 hour
·.·.DAtE·..··· '. . TIME. .' . ···VOLUMEDESCß.IP'....ONOFINCIQENT&CAU$E>·
4/1/2004 2047-2124 150 Not required for unplanned events <= 1 hr
TOTAL
150
AÇTION TAKEN TQ ELIMINATE CAUSE'
Not required for unplanned events which
lunplanned Events greater than 1 hour
DATE'" . . . .. ·.TIME· . . .. "'VOLUME '. . PESCRIPTJON OF INCIDENT & CAI.)$E:>
4/18/2004 2127-2252 479 See Attachments
4/25/2004 1905-2140 398
4/25/2004 2140-2400 214
4/26/2004 0001-2359 1,798
4/27/2004 0001-0443 353
TOTAL 3,242
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
". .... 'DATe'" ··:n:TIME>·"::;;VqL(J\IIIV:>·D~$ÇRIPTIONOFINÇ'DE~T.IiCAµS~.: .... '. .........: .A~mON TAKEN TO ELIMINATE CAUSE'"
See Attachments See Attachments
TOTAL
o
t
~Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE· .. . TIME ." ..n. ...... ·..VOLUME 'DESçRIPr,ONOFINClPENT& CAI.).$E. .'
See Attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
3,242
o
o
19,605
. . . ACTION TAKEN TO ELIMINATE CAUSE .
See Attachments
... . : ACTIONTAKENTqELIMINATECAI,JSE
See Attachments
5/11/2004
1 :33 PM
REPORT NO: 04-0127
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 18 Apr 2004
SYSTEM
1. Flare/Relief Valve
TIME OF FLARING
Start Stop Duration
21 :27 22:52 2 Hrs
Black
Intermittent Smoke
OMins 0 0
PlannedVOLUM£
o 479 MSCF
TOTAL VOLUME
479 MSCF
First Determination of Cause:
1. Asset Area K-550 wet gas compressor shut down because of a problem associated with SK-20 low
gas alarm. This shuts fuel gas supply down to both the TEG reboilers and the K-5500 make up gas
Action Taken to Stop Flaring:
1. Flaring was permitted to continue while Gc operations personnel attempted to restart the
equipment.3 restarts attempted a 2120 hrs,2150 hrs, and 2345hrs. Started shipping water to FS3 to
minimize flaring off skim tanks.
Sunday, April 25, 2004
Page 1 of 1
REPORT NO: 04-0138
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 25 Apr 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOlUME
1. Flare/Relief Valve 19:05 21 :40 2 Hrs 35 Mins 0 D 0398. MSCF
2. Flare/Relief Valve 21 :40 24:00 2 Hrs 20 Mins 0 0 0 214 MSCF
TOTAL VOLUME . 612·MSCF
First Determination of Cause:
1. K-5500 compressor shut down for compressorbundJe.repJacement.
2. K-5500 compressor shut down for compressor bundle replacement.
Action Taken to Stop Flaring:
1. X pad was shut down the same time K-5500 was so plant rate was reduced by 75 mmscf gas and
48 mbpd water. Purge gas to flare was started @ 1930 hrs.
2. All water routed to FS-3 and online skim tank shut down and isolated.
Monday, May 03, 2004
Page 1 of 1
REPORT NO: 04-0139
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 26 Apr 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke· Planned VOLUME
1. Flare/Relief Valve 00:01 23:59 23 Hrs 58 Mins DO 0 1,798.MSCF
TOTAL VOLUME 1,798 MSCF
First Determination of Cause:
1. K-5500 compressor shut down for compressor bundle replacement.
Action Taken to Stop Flaring:
1. X pad was shut down the same time K-5500 was so plant rate was reduced by 75 mmsctgas and
48 mbpd water. Purge gas to flare was started @ 1930 hrs. Reduced HP gas rate 100 mmscf @
0245 hrs.
Monday, May 03, 2004
Page 1 of 1
REPORT NO: 04-0145
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 27 Apr 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 00:01 04:43 4 Hrs 42 Mins 0 0 0 ,353 MSCF
TOTAL VOLUME
353 MSCF
First Determination of Cause:
1. K-5500 compressor shut down for compressor bundle replacement.
Action Taken to Stop Flaring:
1. K-5500 was..s/D.JorbundJe.raplacemeotplant rate was reduced by 103 mmscf gas.asA pad was
SID for ESD testing. contuinues purges gas was utilized to flare throughout SID. K-5500 Was
restarted @ 04:12 hours.
Monday, May 03, 2004
Page 1 of 1
GPB Flaring Incident
To:
Steve McMains, AOGCC
steve mcmains@admin.state.ak.us
907-793-1241, fax 907-276-7542
From:
Hal Tucker, GPB Prod Optim Team Leader, 907-659-4472
An extended flare event occurred beginning at 19:05 on April 25, 2004 at
GC3. The K5500 compressor bundle was replaced with a newly rebuilt
bundle due to excessive and increasing vibrations on the old bundle.
Production was cut per our procedure to minimize flaring. Assist gas was
added as necessary to ensure compliance with our Title V air quality
permit. Total volume flared was 2,763 MSCF, over a 33 hour and 37 minute
duration.
If you require additional information, please do not hesitate to call
me.
Hal Tucker
GPB Production Optimization TL
659-4472
Lofl
5/3/2004 6:45 AM
Gas Release And Venting
Steve,
Thanks for calling me back this morning, sorry I wasn't in the office when you called.
When pressuring up our EWE Mlline yesterday to verify recent repairs, we had a stem seal leak on a
shutdown valve at W-pad. We haven't finished volume calculations yet, but don't feel that the stem seal
leak came anywhere near the 1 OOOmscf threshold that requires reporting under 20 MC 25.205. In order to
repair the stem seal, we've begun venting the system. There is some potential that we could reach the
1 OOOmscf threshold before the venting operation is complete.
Venting of the system doesn't seem to fit the category of "uncontrolled release" that requires notification,
but I wanted to inform you of the work we're doing and see what your thoughts are.
We are always happy to communicate with your folks and make you aware of our activities, but I would be
interested in knowing whether you think this falls into the category of uncontrolled release per 20 Me
25.205.
Thanks again for your time,
Dave
David Dawley
GPB Environmental Advisor
6594789
"Lofl
4/15/200411:33 AM
..'
r
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000033
2. Facility Name
PBU GC 3
Disposition
3. Field
PBU - WOA
Volume MCF
4. Operator
5. MonthNear of Disposition
BP Ma -2004
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
o
Pool Name
PRUDHOE
Pool Code
640150
Percent
100.00%
7. Reinjected
o
8. Flared or vented 1 hour or less
747
9. Flared or vented more than 1 hour (see instr.)
o
10. Pilot and Purge
16,153
11. Used for lease operations (specify in Remarks)
525,952
12. Other (see instructions)
o
Authorization> 1 hr:
MCF
Safety
13. TOTAL VOLUME (ITEMS 6-12)
542,852
MCF
14. NGL Gas EqUiVale~
Lease Use
o
MCF
Conservation
15. Purchased gas
o
Waste:
MCF
16. Transferred from:
o
17. Transferred to: (Express as a negative #) CCP
-28,442,618
Commissioner
Date
18. Remarks: Block 11: Fuel Gas = 525,952 mscf and Assist Gas = 0 mscf
I hereby certify that the foregoi
Signature Q ~
Title
Date
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authorit 20 AAC25.235.
Printed Name
Robert A. Re no Ids
Phone (907)564-5028
Form 10-422 Rev. 1/2004
Submit in Duplicate
,
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
May 2004
Page 1
Unplanned Events less than or equal to 1 hour
5/2/2004
5/7/2004
5/17/2004
5/27/2004
1407-1418
1515-1520
1423-1428
1441-1530
252 Not required for unplanned events <= 1 hr
175
174
146
Not required for unplanned events which
TOTAL
747
See Attachments
See Attachments
TOTAL
o
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
·DA,TE . . TIME . .. ·.V()I.,\1IY1EDE~ÇRIPTlPNOFINÇIDENT& CAU~E
See Attachments
. ACTION TAKEN TO ELIMINATE CAUSE·
See Attachments
TOTAL
o
Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
. ... .DA,TEL·· ........ ·.>TIME ...... .. ·.VPLUME ··DE$CRIPTIOt'fOFINCIDENT&CAUSE .... ·····.··..ACTIONTAKEN TO ELIMINATe CAU$E>
See Attachments See Attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
o
o
o
16,900
6/4/2004
9:55 AM
, .
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000033
3. Field
PBU - WOA
Volume MCF
4. Operator 5. MonthlYear of Disposition
BP June-2004
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
2. Facility Name
PBU GC 3
Disposition
6. Sold
o
Pool Name
PRUDHOE
Pool Code
640150
7. Reinjected
o
8. Flared or vented 1 hour or less
3,441
9. Flared or vented more than 1 hour (see instr.)
1,214
10. Pilot and Purge
16,787
11. Used for lease operations (specify in Remarks)
479,593
12. Other (see instructions)
o
13. TOTAL VOLUME (ITEMS 6-12)
501 ,035
14. NGL Gas Equivalent
o
15. Purchased gas
o
16. Transferred from:
o
17. Transferred to: (Express as a negative #) CCP
-24,412,026
18. Remarks: Block 11: Fuel Gas = 479,593 mscf and Assist Gas = 0 mscf
I h''':,::::fu,(i ~~ ~' b.., "my koom,dg'.
Percent
100.00%
:r6j~
Title
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authorit 2 AAC2 .235.
Printed Name
Robert A. Re nolds
Date
Submit in Duplicate
Phone (907)564-5028
Form 10-422 Rev. 1/2004
BP EXPLORATION (ALASKA) INC.
PRUDHOE SAY UNIT· GC-3
GAS FLARING INCIDENT REPORT
June 2004
Page 1
l~nPlannedEvent~ less than or equal to 1 hour
ix.P~!Ë.···············.i'!IIII!!;T'············· ·····,·TVºIgºIII!I;PI;$ºF!!~!'ºNTº¡:;;I~ºIºI;N1'IIlº~!.I$!;·······
6/2/2004 0744-0805 15 Not required for unplanned events <= 1 hr
6/8/2004 1220-1256 625
6/8/2004 1656-1701 260
6/9/2004 1915-1928 903
6/13/2004 1739-1747 56
6/23/2004 0603-0702 1,475
6/23/2004 1936-2005 60
6/24/2004 2255-2312 47
. · ACTION TAKEN TO ELlMlfilATE CAUSE ...
Not required for unplanned events which
TOTAL
3,441
I~nplanned Events.~reater than 1 hour
···.PAT;·:·····························...TIME········........ ............... ···Mo!4QM;TQ!;$ºF!lflTIONTOfINØIÞ!<NTIIlCAQ$!;.······· ....
6/24/2004 0449-0852 675 See Attachments
6/25/2004 1110-1300 306
6/26/2004 0210-0334 233
. ACTION tAI<ENTOEI.JMINATECALlSi:·'
See Attachments
J
TOTAL
1,214
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
.TDATET···············································TIIIIJ!;······························· ··IJ:QI.iU.MeT.·····.··..I:)I;$ºFlIFlT10NOFINØIPeNT8(icA!J$E
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE .
See Attachments
. .. .1
TOTAL
o
Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf ..~
·.··..··...pATIi.···················..·..T[IMI;TT········,.·i.·...i\l.OI.iu.Mr;..T··.ºI;$c;F!IF!T!O.N·O¡:;;rl~øII:)I;NTIIl.c;AU..$I;·· . ... ... .. . ·········Ac;T'ºN[AKENrroE!,l!.M!filA!Ec~Q$J:TT····
See Attachments See Attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5.000 MCF
Planned Events> 1 hour or
exceeding 5.000 MCF
Pilot Purge
Assist
1.214
o
o
TOTAL FLARED VOLUME
21,442
7/6/2004
1:21 PM
REPORT NO: 04-0253
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3 DATE: 24 Jun 2004
TIME OF FLARING
SYSTEM Start Stop Duration Intermittent
1. Flare/Relief Valve 04:49 08:52 4 Hrs 3 Mins 0
2. Flare/Relief Valve 22:55 23:12 0 Hrs 17Mins 0
Black
Smoke Planned VOLUME
0 0 675 MSCF
0 0 47 MSCF
TOTAL VOLUME 722 MSCF
First Determination of Cause:
1. K-5500 wet gas compressor shut down because of a problem associated with high oil temp.
2. K-5500 wet gas compressor shut down because of a problem associated with high oil temp.
Action Taken to Stop Flaring:
1. Followed pee procedure and cut H20 over 4hrs.
2. No response taken as this was deemed to be of short duration.
Thursday, July 01, 2004
Page 1 of 1
REPORT NO: 04-0255
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 25 Jun 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 11:10 13:00 1 Hrs 50 Mins 0 0 0 306 MSCF
TOTAL VOLUME
306 MSCF
First Determination of Cause:
1. K-5500 wet gas compressor shut down because of a problem associated with high oil temp.
Action Taken to Stop Flaring:
1. Flaring was permitted to continue while GC operations personnel attempted to restart the
equipment. 1 of restarts attempted at 1300 hrs. Followed pee procedure for K-5500 SID.
Thursday, July 01, 2004
Page 1 of 1
bp
REPORT NO: 04-0257
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 26 Jun 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 02:10 03:34 1 Hrs 24Mins 0 0 0 233 MSCF
TOTAL VOLUME
233 MSCF
First Determination of Cause:
1. K-5500 wet gas compressor shut down because of a problem associated with high oil temp.
Action Taken to Stop Flaring:
1. Flaring was permitted to continue while GC operations personnel attempted to restart the
equipment. At 0310 cut 10MBWPD. Chokes started back open when K-5500 re-started at 0334hrs.
Thursday, July 01, 2004
Page 1 of 1
GPB Flaring Incidents
To:
Steve McMains, AOGCC
steve mcmains@admin.state.ak.us
907-793-1241, fax 907-276-7542
From:
Hal Tucker, GPB Prod Optim Team Leader,
907-659-4472
Several extended flare events occurred in the past few
weeks at GPB. This is a note giving you a courtesy "heads up" on the
greater than one hour flare events you will be seeing in the monthly gas
disposition reports prepared by the Anchorage Volume Accounting Team.
* ~experienced three flare events on June 24, 25 and 26 due to
K5500 ~ng down on high lube oil temperature. Temperature probes,
RTD's and switches were changed out during the three days in attempts to
eliminate that root cause of the shut downs. K5500 procedures were
followed to minimize flaring. Total volume for the three events was
1,261 MSCF, total duration for the three events was 7 hours and 17
minutes.
* FS1 experienced one extended flare event beginning at 10:00 June
17 and ending at 02:45 June 18 when the 1801 STV/IP compressor shut down
due to high ambients. Several attempts were made to restart and reload
the machine. Total flare volume for the event was 8,491 MSCF over 16
hours and 45 minutes.
* GC2 experienced two flare events on May 30 and 31 due to PLC
malfunction in the produced water section of the plant. The production
cuts resulting from the water section upset caused the skid 18, IP and
LP compressors to surge intermittently due to the low GC oil rate. The
compressors loaded up as GC2 oil rates returned to normal. Total volume
for the two events was 920 MSCF, total duration was 5 hours and 31
minutes.
* CGF experienced two flare events on June 17 and 18. The first
event occurred when the 1884 tandem shut down 3 times due to high
ambient temperatures over a 2 hour period. Each shut down resulted in 15
minutes of flaring. This event should have been captured as three
separate flaring events and should not be considered as a greater than
one hour event. The second event occurred when the 1805 MI compressor
shut down a recycle trip while loading the boosters. Flaring stopped
when 1805 was restarted. Total duration for the 1805 event was 1 hour
and 14 minutes, total volume was 8,677 MSCF.
* LPC experienced one flare event on June 17 when the 1808 gas
reinjection turbine shut down. Flaring stopped when 1808 was restarted.
10f2
6/28/20047:02 AM
.
GPB Flaring Incidents
Gas was cut during the event to reduce flare volume. Total duration for
the event was 1 hour and 16 minutes, total volume was 5,804 MSCF.
* FS3 experienced two flare events on JUDe 17 and June 20. The
first event occurred when the 1801 STV/IP compressor shut down due to
high ambients and plant upsets. After three failed restart attempts, the
spare machine (1802) was started, ending the flare event. Total duration
for this event was 1 hour and 10 minutes, total volume was 466 MSCF. The
second event occurred when the 1806 gas lift machine shut down due to
instrumentation problems. 1806 was secured and depressured, ending the
flare event. Total duration of the event was 6 hours of intermittent
flaring totaling 685 MSCF.
If you require additional information, please do not
hesitate to call me.
Hal Tucker
GPB Production Optimization TL
.
20f2
6/28/20047:02 AM
-
·
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000033
2. Facility Name
PBU GC 3
Disposition
3. Field
PBU - WOA
Volume MCF
6. Sold
o
7. Reinjected
o
8. Flared or vented 1 hour or less
o
9. Flared or vented more than 1 hour (see instr.)
1,986
10. Pilot and Purge
15,674
11. Used for lease operations (specify in Remarks)
410,147
12. Other (see instructions)
o
13. TOTAL VOLUME (ITEMS 6-12)
427,807
14. NGL Gas Equivalent
o
15. Purchased gas
o
16. Transferred from:
o
17. Transferred to: (Express as a negative #) CCP
-18,864,402
18. Remarks: Block 11: Fuel Gas = 410,147 msef and Assist Gas = 0 msef
I hereby certify that the foregoin is true and correct to the best of my knowledge.
Signature Q . Q ,
4. Operator 5. MonthlYear of Disposition
BP Jul -2004
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
Pool Name
PRUDHOE
Pool Code
640150
Percent
100.00%
€fL
Printed Name
Robert A. Re nolds
Phone (907)564-5028
Date
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authorit 20 MC25.235.
Title
Form 10-422 Rev. 1/2004
Submit in Duplicate
.Þ
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
July 2004
Page 1
IU~Planned ~~ents less than or equal to 1 hour
.... ·QA11$..· ..... ....... ... .J1MI:..· ............ ... .VOLUI\IIE ·.·.·DIa!>CRIPTIONOFINCIQENT& CAUSE... .... ........... ACTION. TAKEN TO ELIIVI I NATE CAUSE ...
Not required for unplanned events <= 1 hr Not required for unplanned events which
I
TOTAL
o
Iunplanned Events ~reater than 1 hour
... ... .DATEi..··· ...... ... ·TIIIIIE· .. ... ...... .·.VOLUIlllEi . . .·DI;SCRIPTIONOFINCIDENT& CAUSE..
7/3/2004 1015-1310 243 See Attachments
7/18/2004 1726-2010 1,743
· .. ......... AÇTIONTAKEN.TOI:L.IMINATE CAUSe · .
See Attachments
I
TOTAL
1,986
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf t
· . .. . . DATE: . ..... ..... ...... ... . . TIME . .. . . ... . .. .... .·.:VOLUME· .PESÇRIPTION· OF INCIDENT & CAUSE . . . · . · · · · · . · ACTION TAKEN TO ELIMINATE CAUSE·
See Attachments See Attachments
TOTAL
o
Ipla~~~~EventsE~c;~~~g .1 Hour. O~:L~;:din~:~~~I~~~NOFINCIDENT& CAUSE. . . . . . . . . . . . . ACTION TAKEN TO ELIMINATE CAUSE.
See Attachments See Attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
1,986
o
o
TOTAL FLARED VOLUME
17,660
8/9/2004
9:29 AM
REPORT NO: 04-0272
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 03 Jul2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 10:15 13:10 2Hrs 55Mins 0 0 0 243 MSCF
TOTAL VOLUME
243 MSCF
First Determination of Cause:
1. Sk-18 K-5500 wet gas compressor shut down because of controllinstrumentation failure associated
with discharge pressure switch
Action Taken to Stop Flaring:
1. WOA reduced production rates. Wells were choked back starting at 10:30 hours equaling 175
mmscfd.
Wednesday, July 28,2004
Page 1 of 1
REPORT NO: 04-0297
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 18 Jul 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/ReliefValve 17:26 20:10 2Hrs 44Mins 0 0 0 1,743 MSCF
TOTAL VOLUME 1,743 MSCF
First Determination of Cause:
1. K-5500 SD.
Action Taken to Stop Flaring:
1. Per K-5500 SD procedure.
Wednesday, July 28,2004
Page 1 of 1
FW: GPB Flaring Incidents
To:
Steve McMains, AOGCC
steve mcmains@admin.state.ak.us
907-793-12411 fax 907-276-7542
From:
Hal Tucker, GPB Prod Optim Team Leaderl
907-659-4472
Two extended flare events occurred in the last two days
at GPB. This is a note giving you a courtesy "heads up" on the greater
than one hour flare events you will be seeing in the monthly gas
disposition reports prepared by the Anchorage Volume Accounting Team.
* GC3 experienced an extended flaring event on July 18 due to
K5500 shutting down on low suction pressure. The "slide valve" was found
to be out of position and was re-calibrated. K5500 procedures were
followed to minimize flaring. Total flared volume was 1,743 MSCF1 total
duration for the event was 2 hours and 44 minutes.
* GC2 experienced an extended flaring event on July 19, when K7000
was shut upon discovery of a lube oil leak. 66 wells were choked back
and/or shut in to get out of flare. Total flared volume was 3/250 MSCF,
total duration was 1 hour and 57 minutes.
If you require additional information, please do not
hesitate to call me.
Hal Tucker
GPB Production Optimization TL
1 >of I
7/21/20048:10 AM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACiliTY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000033
2. Facility Name
PBU GC 3
Disposition
6. Sold
7. Reinjected
8. Flared or vented 1 hour or less
9. Flared or vented more than 1 hour (see instr.)
10. Pilot and Purge
11. Used for lease operations (specify in Remarks)
12. Other (see instructions)
13. TOTAL VOLUME (ITEMS 6-12)
14. NGL Gas Equivalent
15. Purchased gas
16. Transferred from:
17. Transferred to: (Express as a negative #) CCP
18. Remarks: Block 11: Fuel Gas = 441,928 mscf and Assist Gas == 0 mscf
Signature
Printed Name
Robert A. Re nolds
Form 10-422 Rev. 1/2004
3. Field
PBU - WOA
Volume MCF
o
o
379
66,667
15,620
441,928
o
524,594
o
o
o
-22,195,831
Title
Phone (907)564-5028
4. Operator 5. MonthlYear of Disposition
BP Au ust-2004
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
Pool Name
PRUDHOE
Pool Code
640150
100.00%
Percent
Authorization> 1 hr:
MCF
&6 (,6 1
MCF
(f8,~
Safety
Lease Use
Conservation
MCF
Waste:
Date5·2f)-o.
MCF
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authorit 20 AAC25.23 .
Date
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
August 2004
lunplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
8/5/2004 0922-0927 35 Not required for unplanned events <= 1 hr
8/7/2004 1700-1710 69
8/11/2004 1106-1111 17
8/23/2004 1532-1548 167
8/28/2004 0405-0410 35
8/28/2004 1150-1158 56
Page 1
...
TOTAL
379
lunplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
8/9/2004 0220-1020 66,667 See Attachments
TOTAL
66,667
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL
o
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
See Attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
66,667
o
o
TOTAL FLARED VOLUME
82,666
See Attachments
9/3/2004
9:49 AM
REPORT NO: 04-0332
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 09 Aug 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 02:20 10: '2.0 8 Hrs 0 Mins ~ ~ 0 66,667 MSCF
TOTAL VOLUME 66,667 MSCF
First Determination of Cause:
1. LPS compressor K-7000 and K-7001 shut down because of a problem associated with UPS power
Action Taken to Stop Flaring:
1. WOA reduced production rates and shut in all wells equaling 1000 mmscfd.
VVednesday,August25,2004
Page 1 of 1
Flaring Questions
Gary,
I have a couple of question Jim Regg needs an answer too. I will break it down by
field.
*PBU GC-3 for August 2004* - On Aug 9th, LPS compressor Shut down because of a
problem associated with UPS power. He would like more detail to explain what
happen, associated with UPS power?
*GPMA Facility Oct 2000 thru Aug 2004* - Oct 2000, Dec 2001, Jan 2003 and Aug 2004
the facility had a sharp spike in the pilot-purge volume, from less than 15,000 mcf
to over 40,000 mcf just for those four months. Could you provide an explanation
why these sharp spike took place in pilot-purge volumes. This is the only facility
that has shown these spikes for pilot-purge volumes.
Steve
1 of I
10/28/2004 I :29 PM
RE: Data Request
To: Steve McMains, AOGCC
steve mcmains@admin.state.ak.us
907-793-1241, fax 907-276-7542
From: Hal Tucker, GPB Prod Optim Team Leader, 907-659-4472
The incident in question was initiated at 0220 on 8/9/2004 when the UPS
monitoring system for the LPS sections (skids 460 & 461) of GC3 "died
completely". Under normal conditions, a fault in the UPS would be
detected [by the monitoring system] and the plant power supply would be
seamlessly failed over from UPS to CPS line power. Due to the complete
failure of the UPS monitoring system the fail over did not occur and the
LPS sections lost power resulting in a plant shut down. Restart of the
plant began at 0600 but, wasn't successfully restarted until after 1600.
During the several restart attempts it took to get K7000 and K7001 (LPS
turbine/compressors) up and running at least 3 blown power supply cards
had to be replaced in the turbine controls systems.
Hal Tucker
GPB Production Optimization Team Leader
659-4472
From: Stephen Mcmains [mailto:steve mcmains@admin.state.ak.us]
Sent: Tuesday, March 29, 2005 8:04 AM
To: Tucker, Hal E
Cc: Jim Regg
Subject: Data Request
Hal,
In August 2004, GC -3 had a greater than 1 hour flaring event with
66,667 mcf of gas reported vented. On the monthly report submitted to
AOGCC, the event stated, "LPS compressor K-7000 and K-7001 shut down
because of a problem associated with UPS power". Could you expand in
depth on what is met by, "problem associated with UPS power"?
I have tried several times for an explanation and haven't received an
explanation yet, six months, so could you please respond by the 6th of
May 2005. Thank you.
Steve
10f2
3/29/2005 2: 13 PM
.!
...
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000033
2. Facility Name
PBU GC 3
Disposition
3. Field
PBU - WOA
Volume MCF
6. Sold
7. Reinjected
8. Flared or vented 1 hour or less
3,063
9. Flared or vented more than 1 hour (see instr.)
10,534
10. Pilot and Purge
18,682
11. Used for lease operations (specify in Remarks)
415,665
12. Other (see instructions)
13. TOTAL VOLUME (ITEMS 6-12)
447,944
14. NGL Gas Equivalent
15. Purchased gas
16. Transferred from:
17. Transferred to: (Express as a negative #) CCP
-26,572,481
18. Remarks: Block 11: Fuel Gas = 415,665 mscf and Assist Gas = 0 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature{.A &-,i~""""'" h~
4. Operator 5. MonthlYear of Disposition
BP Se tember-2004
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
o
Pool Code
640150
Percent
100.00%
Pool Name
PRUDHOE
o
o
o
o
o
Printed Name
Robert A. Re nolds
Phone (907)564-5028
Title Mana er, State Taxes and Ro alt
Date lc- (~ -C'
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authorit 20 AAC25.235.
Form 10-422 Rev. 1/2004
Submit in Duplicate
~ ..
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
September 2004
Page 1
Unplanned Events less than or equal to 1 hour
9/3/2004
9/3/2004
9/5/2004
9/5/2004
9/6/2004
9/6/2004
9/1 0/2004
9/16/2004
9/16/2004
9/17/2004
9/19/2004
9/24/2004
9/25/2004
9/25/2004
9/27/2004
9/28/2004
0011-0018
1642-1649
0325-0338
0749-0756
1131-1211
1707-1716
0231-0241
0358-0418
0528-0532
2036-2112
1 039-1 053
1436-1517
0500-0600
1612-1616
1642-1646
1018-1050
48 Not required for unplanned events <= 1 hr Not required for unplanned events which
45
144
97
417
63
56
97
11
375
49
63
1,250
70
56
222
TOTAL
3,063
9/4/2004
9/7/2004
9/13/2004
9/14/2004
1417-2203
1417-2203
1749-2359
0001-0530
5,825 See Attachments
312
2,569
1,828
See Attachments
TOTAL
10,534
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
See Attachments
See Attachments
TOTAL
o
10/5/2004
2:56 PM
..
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
September 2004
Page 2
Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
. .... DATE· . . TIME ..... .. VOLUME ..DESCRtPTtONOFINCIDE!NT& CAUSE·
..... .. . ,_,_._,_. . ............ ............,..... ........."..,...". .................. ....................... ..............m............
See Attachments
... ACTIONTAKENTQEUMINATI;CAUSE· .
See Attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
3,063
10,534
o
o
32,279
10/5/2004
2:56 PM
REPORT NO: 04-0405
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 04 Sep 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 14:17 22:03 7Hrs 46Mins ~ 0 0 5,825 MSCF
TOTAL VOLUME 5,825 MSCF
First Determination of Cause:
1. Extended flaring event occurred while awaiting GC operator/maintenance evaluation.
Action Taken to Stop Flaring:
1.
Monday, September 27, 2004
Page 1 of 1
REPORT NO: 04-0404
BPXA FLARE REPORT
PRUDHOE SAY
FACILITY: GC3
DATE: 04 Sep 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 14:17 22:03 7 Hrs 46 Mins 0 0 0 312 MSCF
TOTAL VOLUME
312 MSCF
First Determination of Cause:
1. Plant master SID apparently generated by PLC in LPS, still under investigation as to cause, by PAC
techs.
Action Taken to Stop Flaring:
1. Equipment was restarted at 2203 hours.
Monday, September 27,2004
Page 1 of 1
REPORT NO: 04-0431
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 13 Sep 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 17:49 23:59 6 Hrs 10 Mins 0 0 0 2,569 MSCF
TOTAL VOLUME 2,569 MSCF
First Determination of Cause:
1. GC3 SID -- cause has not been identified. Flaring resulting from HP leak by and K5500 LP gas.
Also have assist gas in service to prevent black smoke.
Action Taken to Stop Flaring:
1. Closed 6" flowline outlets on the well pads to minimize HP leak by.
Monday, September 27, 2004
Page 1 of 1
REPORT NO: 04-0439
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 14 Sep 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 00:01 05:30 5 Hrs 29 Mins 0 0 0 1,828 MSCF
TOTAL VOLUME 1,828 MSCF
First Determination of Cause:
1. GC3 SID -- cause has not been identified. Flaring resulting from HP leak by and K5500 LP gas.
Also have assist gas in service to prevent black smoke.
Action Taken to Stop Flaring:
1. Closed 6" flowline outlets on the well pads to minimize HP leak by.
Monday, September 27,2004
Page 1 of 1
-
,4
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000033
3. Field
PBU - WOA
Volume MCF
2. Facility Name
PBU GC 3
Disposition
6. Sold
o
7. Reinjected
o
8. Flared or vented 1 hour or less
7,556
9. Flared or vented more than 1 hour (see instr.)
5,190
10. Pilot and Purge
16,951
11. Used for lease operations (specify in Remarks)
504L94--_
12. Other (see instructions)
o
13. TOTAL VOLUME (ITEMS 6-12)
534,491
14. NGL Gas Equivalent
o
15. Purchased gas
o
16. Transferred from:
o
17. Transferred to: (Express as a negative #) CGF
-28,299,777
18. Remarks: Block 11: Fuel Gas = 504,794 mscf and Assist Gas = 0 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
SignatureA~~ ~
Printed Name Bernard w~a n
4. Operator 5. MonthNear of Disposition
BP October-2004
20. For production from multiple pools. list contribution of each pool as a percent of
Total Volume.
Pool Name
PRUDHOE
Pool Code
640150
Percent
100.00%
MCF
MCF
MCF
'%:&ðCf
Phone (907)564-5028
Title Mana er, Production Taxes and Ro alt
Date l \~\ ì -0
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authorit 20 AAC25. 35.
Form 10-422 Rev. 1/2004
Submit in Duplicate
.-
.-
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
October 2004
Page 1
Unplanned Events less than or equal to 1 hour
1 0/2/2004
1 0/2/2004
10/4/2004
10/5/2004
1 0/5/2004
1 0/7/2004
1 0/8/2004
1 0/9/2004
10/11/2004
10/12/2004
10/16/2004
10/18/2004
10/18/2004
10/19/2004
10/19/2004
1 0/20/2004
1 0/20/2004
1 0/20/2004
-t f\ /t"")f\ Ir'lf\n A
I VI C.VI C.VV"t
10/24/2004
1 0/27/2004
10/29/2004
1640-1650
0752-0818
1203-1230
0648-0700
0047-0100
0002-0010
1603-161 0
1502-1601
1356-1410
0212-0232
2144-2231
1927-1950
2234-2304
1007-1036
2347-2400
0000-0022
0336-0410
0910-0922
139 Not required for unplanned events <= 1 hr Not required for unplanned events which
361
28
167
90
100
68
1,024
185
150
306
146
417
685
135
229
354
167
1712-1731
Î ,3Î9
1400-1436
1642-1647
1405-1420
750
694
42
TOTAL
7,556
1 0/1/2004
1 0/8/2004
1125-1900
1215-1601
1 ,580 See Attachments
3,610
See Attachments
TOTAL
5,190
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
..>. DATe·' ........... ......... .TIME· ............ VO;.UMEDESCRIPTIONOFJNÇIDENT:~q:AUSJ;; ......··ACT~9NTAKENTO.Et,;IMINATECAUSJ;;·, .... ..
See Attachments See Attachments
TOTAL
o
11/9/2004
10:21 AM
-
..,
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
October 2004
Page 2
Planned Events Exceeding 1 Hour OR Exceedin 5000 Mcf
See Attachments
See Attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
7,556
5,190
o
o
29,697
11/9/2004
10:21 AM
REPORT NO: 04-0477
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 01 Oct 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 11 :25 19:00 7 Hrs 35 Mins 0 0 0 1,580 MSCF
TOTAL VOLUME 1,580 MSCF
First Determination of Cause:
1. Sk-18 K-5500 wet gas compressor shut down because of control/instrumentation failure associated
with relay
Action Taken to Stop Flaring:
1. Flaring was permitted to continue while GC operations personnel attempted to restart the equipment.
Friday, October 22, 2004
Page 1 of 1
t
REPORT NO: 04-0492
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3
DATE: 08 Oct 2004
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
12:15 16:01 3Hrs 46 Mins 0 0 0 3,610 MSCF
16:03 16:10 OHrs 7Mins 0 0 0 68 MSCF
TOTAL VOLUME 3,678 MSCF
First Determination of Cause:
1. K-5500 SID due to a problem with instrumentation. Had to add assist gas to keep from black
smoking.
2. High transit line pressure.
Action Taken to Stop Flaring:
1. No response taken as this was deemed to be of short duration. Reduced H20 rates by pipe lining
H20 to FS-3 as per procedure.
2. WOA reduced production rates and shut-in 3 wells equaling 35 mmscfd. Wells were shut-in or
choked back starting at 1603 hours.
Friday, October 22, 2004
Page 1 of 1
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000033
2. Facility Name
PBU GC 3
Disposition
3. Field
PBU - WOA
Volume MCF
4. Operator 5. MonthNear of Disposition
BP November-2004
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
o
Pool Name
PRUDHOE
Pool Code
640150
Percent
100.00%
7. Reinjected
o
8. Flared or vented 1 hour or less
622
9. Flared or vented more than 1 hour (see instr.)
o
10. Pilot and Purge
23,988
11. Used for lease operations (specify in Remarks)
522,514
12. Other (see instructions)
o
Authorization> 1 hr:
Safety
MCF
13. TOTAL VOLUME (ITEMS 6-12)
547,124
Lease Use
MCF
14. NGL Gas Equivalent
o
Conservation
MCF
15. Purchased gas
o
Waste:
MCF
16. Transferred from:
o
17. Transferred to: (Express as a negative #) CGF
-28,441,842
Commissioner
Date
18. Remarks: Block II: Fuel Gas = 522,514 mscf and Assist Gas = 0 mscf
Signature
Title Mana er, Production Taxes and Ro alt
I hereby certify that the foregoing is true and co ect to the best of my knowledge.
{
Printed Name
Phone (907)564-5028 Date
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authorit 20 C25.235.
Form 10-422 Rev. 1/2004
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
November 2004
Page 1
lunplanned Events less than or equal to 1 hour
.... . DATE . TIME···· . ···VOLUMEDESCRIPT!ONOF INCIDENT & CAUSE .
11/3/2004 0355-0411 556 Not required for unplanned events <= 1 hr
11/18/2004 2109-2128 66
ACTION rAKI;NTO I;LIMINA TE CAUSE.
Not required for unplanned events which
TOTAL
622
Unplanned Events greater than 1 hour
See Attachments
See Attachments
TOTAL
o
~Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
........<DATE . . TIME . VOLUME . . . DESCRIPTION OF INCIDENT & CAUSE
See Attachments
··ACTIONTAKEN TO ELIMINATE CAUSE·
See Attachments
TOTAL
o
Planned Events Exceeding 1 Hour OR Exceedin
See Attachments
See Attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
622
o
o
o
24,610
12/2/2004
3:03 PM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000033
2. Facility Name
PBU GC 3
Disposition
3. Field
PBU - WOA
Volume MCF
4. Operator 5. MonthlYear of Disposition
BP December-2004
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
o
Pool Name
PRUDHOE
Pool Code
640150
Percent
100.00%
7. Reinjected
o
8. Flared or vented 1 hour or less
1,223
9. Flared or vented more than 1 hour (see instr.)
o
10. Pilot and Purge
19,576
11. Used for lease operations (specify in Remarks)
620,432
12. Other (see instructions)
o
Authorization> 1 hr:
Safety
MCF
13. TOTAL VOLUME (ITEMS 6-12)
641 ,231
Lease Use
MCF
14. NGL Gas Equivalent
o
Conservation
MCF
15. Purchased gas
o
Waste:
MCF
16. Transferred from:
o
17. Transferred to: (Express as a negative #) CGF
-28,655,181
Commissioner
Date
18. Remarks: Block 11: Fuel Gas = 620,432 mscf and Assist Gas = 0 mscf
Printed Name
Title Mana er, Production Taxes and Ro alt
I hereby certify that the foregoing is trUejd cor c 0 the best of my knowledge.
Signature -.".
Date /-/
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Auth rit 20 AAC25.235.
Phone (907)564-5028
. ;\,.....
-0....;
Form 10-422 Rev. 1/2004
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
December 2004
Page 1
Unplanned Events less than or equal to 1 hour
12/15/2004
12/15/2004
12/15/2004
12/19/2004
12/22/2004
12/23/2004
0410-0443
0618-0627
2250-2316
0001-0005
0612-0617
2158-2202
TOTAL
688 Not required for unplanned events <= 1 hr
63
397
19
31
25
1,223
Not required for unplanned events which
lunplanned Event~ greater than.1 hour. .
::PAT:E" ..,.. . :·..:;<TIME: ·.·.>LV9~U,M,:: .·.DESCRIPTI9N OFINOIPENT &CAUSE:····
See Attachments
TOTAL
.1
< ACTI9NTAKENTO ELIMINATE CAJSE > ..... .
See Attachments
o
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
TOTAL
See Attachments
See Attachments
o
Planned Events Exceeding 1 Hour OR Exceedin
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
See Attachments
See Attachments
o
o
o
o
20,799
1/10/2005