FACILITY: PBU Lisburne Prod
(GrPtMcArea)
OPERATOR: BP EXPLORATION
I Facility
LISBURNE PRODUCTION CENTER #1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
operator Field(S)
BP EXPLORATION, ALASKA PRUDHOE BAY/PT MCINTYRE
Month/Year of Disposition
01/2004
Disposition
Volume MCF"
1. Sold
126,802
2. Reinjected
8,767,749
3. Flared or vented less than 1 hour.
1,737
4. Flared or vented greater than 1 hour
(Supplemental report required-oSee 20 AAC 25.235)
7,076
5. Pilot and Purge
13,743
6. Used for lease operations
Fuel
Assist
1,009,866
40,285
7. Other
Lift Gas, Off Field
110,546
TOTAL items 1 - 7
10,077,804
8. NGL gas equivalent produced
126,802
9. Purchased gas
10. Transferred from:
11. Transferred to:
Remarks:
I hereby certify that the f~going is true and correct to the best of my knowledge. , /,
Signature: '~Å.c AJ~ Title: U~. ~ Date: ;(,/1 6jo Y
Form 1 0-4;2 (';e~i~ 4/95)
o
o
o
"Indicate contribution of each pool to total.
Pool Name Code Percent
LISBURNE 640144 51.67%
NIAKUK 640148 1.88%
N_PRUDHOE 640152 0.00%
PTMAC 666100 45.58%
W _BEACH 640186 0.00%
/' West Niakuk 640149 0.88%
1. Safety
-¡, 0 7 ~ MCF :5ßp-'
2. Lease Use
MCF
3. Conserv. Purposes
MCF
~/~
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
DATE
1/28/2004
1/28/2004
1/28/2004
1/28/2004
1/29/2004
1/29/2004
1/29/2004
1/31/2004
1/31/2004
1/31/2004
1/28/2004
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
TIME
1305-1324
1344-1347
1935-1940
2141-2143
0232-0233
0232-0238
1222-1249
1538-1540
1557-1604
2326-2327
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-04
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
235
43
117
8
1
99
64
22
89
3
1138-1302
Total Flare <= 1 Hour 681
3,360
Total Flare> 1 Hour
3,360
4,041
6,928
19,243
30,212
Compo 1807 startup prepurge
Compo 1807 startup purge
Comp 1808 shutdown due to seal oil level controller problem
Depressured Com 1808 prior to restart
Turbine 1808 shutdown due to gas detection
Turbine 1808 shutdown due to gas detection
Turbine 1800 shutdown to to low suction pressure
1808 turbine startup attempt
1808 turbine startup attempt
Purgin 1808 turbine
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Finished purging
Purge complete
1808 depressured and shutdown
Depressure complete
Compressor depressurized (LP) and shutdown
Compressor depressurized (HP) and shutdown
Restarted 1800 turbine
Shutdown turbine and depressured compressor
Shutdown turbine and depressured compressor
Purge complete
Compo 1807 shutdown due to seal oil level controller problem
Unplanned Compressor depressured and shutdown, gas rates cut to the field
DATE
01/28/04
01/28/04
01/28/04
01/28/04
01/29/04
01/29/04
01/29/04
01/31/04
01/31/04
01/31/04
01/28/04
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
TIME
1305-1324
1344-1347
1935-1940
2141-2143
0232-0233
0232-0238
1222-1249
1538-1540
1557-1604
2326-2327
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-04
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
244
44
121
8
o
196
123
48
186
7
1138-1302
Total Flare <= 1 Hour 977
3,481
Total Flare> 1 Hour
3,481
4,458
6,412
19,764
30,634
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Compo 1807 startup prepurge
Compo 1807 startup purge
Comp 1808 shutdown due to seal oil level controller problem
Depressured Com 1808 prior to restart
Turbine 1808 shutdown due to gas detection
Turbine 1808 shutdown due to gas detection
Turbine 1800 shutdown to to low suction pressure
1808 turbine startup attempt
1808 turbine startup attempt
Purgin 1808 turbine
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Finished purging
Purge complete
1808 depressured and shutdown
Depressure complete
Compressor depressurized (LP) and shutdown
Compressor depressurized (HP) and shutdown
Restarted 1800 turbine
Shutdown turbine and depressured compressor
Shutdown turbine and depressured compressor
Purge complete
Compo 1807 shutdown due to seal oil level controller problem
Unplanned Compressor depressured and shutdown, gas rates cut to the field
DATE
01/28/04
01/28/04
01/28/04
01/28/04
01/29/04
01/29/04
01/29/04
01/31/04
01/31/04
01/31/04
01/28/04
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-04
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
1305-1324
1344-1347
1935-1940
2141-2143
0232-0233
0232-0238
1222-1249
1538-1540
1557-1604
2326-2327
Total Flare <= 1 Hour 0
1138-1302
Volume Flared 0
Total Flare> 1 Hour 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
o
o
o
o
o
o
o
o
o
o
Compo 1807 startup prepurge
Compo 1807 startup purge
Comp 1808 shutdown due to seal oil level controller problem
Depressured Com 1808 prior to restart
Turbine 1808 shutdown due to gas detection
Turbine 1808 shutdown due to gas detection
Turbine 1800 shutdown to to low suction pressure
1808 turbine startup attempt
1808 turbine startup attempt
Purgin 1808 turbine
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Finished purging
Purge complete
1808 depressured and shutdown
Depressure complete
Compressor depressurized (LP) and shutdown
Compressor depressurized (HP) and shutdown
Restarted 1800 turbine
Shutdown turbine and depressured compressor
Shutdown turbine and depressured compressor
Purge complete
o
Compo 1807 shutdown due to seal oil level controller problem
Unplanned Compressor depressured and shutdown, gas rates cut to the field
DATE
01/28/04
01/28/04
01/28/04
01/28/04
01/29/04
01/29/04
01/29/04
01/31/04
01/31/04
01/31/04
01/28/04
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-04
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
1305-1324
1344-1347
1935-1940
2141-2143
0232-0233
0232-0238
1222-1249
1538-1540
1557-1604
2326-2327
Total Flare <= 1 Hour 0
1138-1302
Volume Flared 0
Total Flare> 1 Hour 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
o
o
o
o
o
o
o
o
o
o
Compo 1807 startup prepurge
Compo 1807 startup purge
Comp 1808 shutdown due to seal oil level controller problem
Depressured Com 1808 prior to restart
Turbine 1808 shutdown due to gas detection
Turbine 1808 shutdown due to gas detection
Turbine 1800 shutdown to to low suction pressure
1808 turbine startup attempt
1808 turbine startup attempt
Purgin 1808 turbine
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Finished purging
Purge complete
1808 depressured and shutdown
Depressure complete
Compressor depressurized (LP) and shutdown
Compressor depressurized (HP) and shutdown
Restarted 1800 turbine
Shutdown turbine and depressured compressor
Shutdown turbine and depressured compressor
Purge complete
o
Compo 1807 shutdown due to seal oil level controller problem
Unplanned Compressor depressured and shutdown, gas rates cut to the field
DATE
01/28/04
01/28/04
01/28/04
01/28/04
01/29/04
01/29/04
01/29/04
01/31/04
01/31/04
01/31/04
01/28/04
TIME
1305-1324
1344-1347
1935-1940
2141-2143
0232-0233
0232-0238
1222-1249
1538-1540
1557-1604
2326-2327
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-04
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
1138-1302
Total Flare <= 1 Hour 55
Total Flare> 1 Hour 165
Volume Flared 220
Measured Safety Pilot 276
Continuous Assist 902
TOTAL FLARED 1,398
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
11
2
6
o
o
12
8
3
12
1
Compo 1807 startup prepurge
Compo 1807 startup purge
Comp 1808 shutdown due to seal oil level controller problem
Depressured Com 1808 prior to restart
Turbine 1808 shutdown due to gas detection
Turbine 1808 shutdown due to gas detection
Turbine 1800 shutdown to to low suction pressure
1808 turbine startup attempt
1808 turbine startup attempt
Purgin 1808 turbine
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
165
Compo 1807 shutdown due to seal oil level controller problem
Unplanned
Finished purging
Purge complete
1808 depressured and shutdown
Depressure complete
Compressor depressurized (LP) and shutdown
Compressor depressurized (HP) and shutdown
Restarted 1800 turbine
Shutdown turbine and depressured compressor
Shutdown turbine and depressured compressor
Purge complete
Compressor depressured and shutdown, gas rates cut to the field
DATE
01/28/04
01/28/04
01/28/04
01/28/04
01/29/04
01/29/04
01/29/04
01/31/04
01/31/04
01/31/04
01/28/04
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-04
TIME
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
1305-1324
1344-1347
1935-1940
2141-2143
0232-0233
0232-0238
1222-1249
1538-1540
1557-1604
2326-2327
Total Flare <= 1 Hour 24
1138-1302
Volume Flared 94
Total Flare> 1 Hour 70
Measured Safety Pilot 127
Continuous Assist 376
TOTAL FLARED 597
5
1
2
o
o
6
3
2
5
o
Compo 1807 startup prepurge
Compo 1807 startup purge
Comp 1808 shutdown due to seal oil level controller problem
Depressured Com 1808 prior to restart
Turbine 1808 shutdown due to gas detection
Turbine 1808 shutdown due to gas detection
Turbine 1800 shutdown to to low suction pressure
1808 turbine startup attempt
1808 turbine startup attempt
Purgin 1808 turbine
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
70
Compo 1807 shutdown due to seal oil level controller problem
Unplanned
Finished purging
Purge complete
1808 depressured and shutdown
Depressure complete
Compressor depressurized (LP) and shutdown
Compressor depressurized (HP) and shutdown
Restarted 1800 turbine
Shutdown turbine and depressured compressor
Shutdown turbine and depressured compressor
Purge complete
Compressor depressured and shutdown, gas rates cut to the field
REPORT NO: 04-0028
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: LPC DATE: 28 Jan 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 11:38 13:02 1 Hrs 24 Mins 0 ~ 0 7,DZ6..MSCF
2. Flare/Relief Valve 13:05 13:24 OHrs 19 Mins 0 0 0 495 MSCF
3. Flare/Relief Valve 13:44 13:47 OHrs 3Mins 0 0 0 90 MSCF
4. Flare/Relief Valve 19:35 19:40 OHrs 5Mins 0 0 '0 "246 MSCF
5. Flare/Relief Valve 21:41 21:43 OHrs 2 Mins 0 0 0 16 MSCF
TOTAL VOLUME 7,923 MSCF
First Determination of Cause:
1. 1807 shutdown on instrumentation problem
2. 1807 start up prepurge
3. 1807 start up purge
4. 1808 shutdown due to seal oil level controller problem
5. depressured 1808 prior to restart
Action Taken to Stop Flaring:
1. 1807 depressured and cut gas rates from the field .
2. finished purging
3. purge complete
4. 1808 depressured and shutdown
5. depressure complete
Friday, February 13, 2004
Page 1 of 1
1!
Facility
LISBURNE PRODUCTION CENTER #1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
loperator I Field(s)
BP EXPLORATION, ALASKA PRUDHOE BAY/PT MCINTYRE
I Month/Year of Disposition
02/2004
Disposition
Volume MCF"
"Indicate contribution of each pool to total.
1. Sold
116,232
Pool Name
Code
Percent
2. Reinjected
3. Flared or vented less than 1 hour.
1,816
LISBURNE
NIAKUK
N_PRUDHOE
PTMAC
W _BEACH
West Niakuk
640144
640148
640152
666100
640186
640149
50.80%
2.22%
0.00%
46.14%
0.00%
0.84%
7,524,909
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235)
o
5. Pilot and Purge
12,862
6. Used for lease operations
Fuel
Assist
896,724
6,081
7. Other
Lift Gas, Off Field
140,750
TOTAL items 1 - 7
8,699,374
1. Safety
MCF
8. NGL gas equivalent produced
116,232
2. Lease Use
MCF
9. Purchased gas
o
3. Conserv. Purposes
MCF
10. Transferred from:
o
Commissioner
Date
11. Transferred to:
o
I ~erebY cert~ that t
Signature: (<" Q .
Form 10-422 (Revised 4/95)
is true and correct to the best of my knowledge.
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
Remarks:
Title: V\I\,(,(t, ¡AX'
Date: 3/11/0'1
DATE
2/1/2004
2/1/2004
2/2/2004
2/2/2004
2/3/2004
2/3/2004
2/4/2004
2/4/2004
2/5/2004
2/6/2004
2/6/2004
TIME
0119-0120
0502-0516
0632-0633
0752-0753
0844-0846
0927-0933
1551-1555
1705-1711
0211-0227
0350-0407
2031-2055
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-04
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
4
33
2
1
3
96
47
80
18
28
252
Total Flare <= 1 Hour 564
Total Flare> 1 Hour 0
Volume Flared 564
Measured Safety Pilot 6,139
Continuous Assist 1,886
TOTAL FLARED 8,589
Purging 1808 compressor
Turbine 1800 chut down due to low suction pressure
Turbine surged
Turbine surged
Compressor 1808 pre-start purge
Compressor 1808 startup attempt
Flare due to attempting to start 1808
Flare due to attempting to start 1808
STV/IP 1800 T/C went down on low suction pressure
STV/IP 1800 T/C went down on low suction pressure due to pressure swings
T/C 1808 startup attempt
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Planned
Purge completed
Restarted turbine
Instrumentation corrected
Instrumentation corrected
Purge completed
Compressor shut down
Terminated startup attempt
Terminated startup attempt
T /C restarted
T/C restarted. Low pressure flare event
T/C 1808 shutdown for further mechanical work. HP flare event.
DATE
02/01/04
02/01/04
02/02/04
02/02/04
02/03/04
02/03/04
02/04/04
02/04/04
02/05/04
02/06/04
02/06/04
Volume Flared
TIME
0119-0120
0502-0516
0632-0633
0752-0753
0844-0846
0927-0933
1551-1555
1705-1711
0211-0227
0350-0407
2031-2055
Total Flare <= 1 Hour
Total Flare> 1 Hour
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-04
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
5
64
3
2
4
188
60
194
38
43
548
1,149
1,149
6,277
3,844
11,270
Purging 1808 compressor
Turbine 1800 chut down due to low suction pressure
Turbine surged
Turbine surged
Compressor 1808 pre-start purge
Compressor 1808 startup attempt
Flare due to attempting to start 1808
Flare due to attempting to start 1808
STVIIP 1800 TIC went down on low suction pressure
STVIIP 1800 TIC went down on low suction pressure due to pressure
TIC 1808 startup attempt
o
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Planned
Purge completed
Restarted turbine
Instrumentation corrected
Instrumentation corrected
Purge completed
Compressor shut down
Terminated startup attempt
Terminated startup attempt
TIC restarted
TIC restarted. Low pressure flare event
TIC 1808 shutdown for further mechanical work. HP flare event.
DATE
02/01/04
02/01/04
02/02/04
02/02/04
02/03/04
02/03/04
02/04/04
02/04/04
02/05/04
02/06/04
02/06/04
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-04
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
0119-0120
0502-0516
0632-0633
0752-0753
0844-0846
0927-0933
1551-1555
1705-1711
0211-0227
0350-0407
2031-2055
Total Flare <= 1 Hour 0
Volume Flared 0
Total Flare> 1 Hour 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
o
o
o
o
o
o
o
o
o
o
o
Purging 1808 compressor
Turbine 1800 chut down due to low suction pressure
Turbine surged
Turbine surged
Compressor 1808 pre-start purge
Compressor 1808 startup attempt
Flare due to attempting to start 1808
Flare due to attempting to start 1808
STV/IP 1800 TIC went down on low suction pressure
STVIIP 1800 TIC went down on low suction pressure due to pressure
TIC 1808 startup attempt
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Planned
Purge completed
Restarted turbine
Instrumentation corrected
Instrumentation corrected
Purge completed
Compressor shut down
Terminated startup attempt
Terminated startup attempt
TIC restarted
TIC restarted. Low pressure flare event
TIC 1808 shutdown for further mechanical work. HP flare event.
DATE
02/01/04
02/01/04
02/02/04
02/02/04
02/03/04
02/03/04
02/04/04
02/04/04
02/05/04
02/06/04
02/06/04
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-04
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
0119-0120
0502-0516
0632-0633
0752-0753
0844-0846
0927-0933
1551-1555
1705-1711
0211-0227
0350-0407
2031-2055
Total Flare <= 1 Hour 0
Volume Flared 0
Total Flare> 1 Hour 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
o
o
o
o
o
o
o
o
o
o
o
Purging 1808 compressor
Turbine 1800 chut down due to low suction pressure
Turbine surged
Turbine surged
Compressor 1808 pre-start purge
Compressor 1808 startup attempt
Flare due to attempting to start 1808
Flare due to attempting to start 1808
STV/IP 1800 TIC went down on low suction pressure
STV/IP 1800 TIC went down on low suction pressure due to pressure
TIC 1808 startup attempt
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Planned
Purge completed
Restarted turbine
Instrumentation corrected
Instrumentation corrected
Purge completed
Compressor shut down
Terminated startup attempt
Terminated startup attempt
TIC restarted
TIC restarted. Low pressure flare event
TIC 1808 shutdown for further mechanical work. HP flare event.
DATE
02/01/04
02/01/04
02/02/04
02/02/04
02/03/04
02/03/04
02/04/04
02/04/04
02/05/04
02/06/04
02/06/04
TIME
0119-0120
0502-0516
0632-0633
0752-0753
0844-0846
0927-0933
1551-1555
1705-1711
0211-0227
0350-0407
2031-2055
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-04
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
Total Flare <= 1 Hour 71
Total Flare> 1 Hour 0
Volume Flared 71
Measured Safety Pilot 321
Continuous Assist 242
TOTAL FLARED 634
o
5
o
o
o
12
7
10
2
1
34
Purging 1808 compressor
Turbine 1800 chut down due to low suction pressure
Turbine surged
Turbine surged
Compressor 1808 pre-start purge
Compressor 1808 startup attempt
Flare due to attempting to start 1808
Flare due to attempting to start 1808
STVIIP 1800 TIC went down on low suction pressure
STVIIP 1800 TIC went down on low suction pressure due to pressure
TIC 1808 startup attempt
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Planned
Purge completed
Restarted turbine
Instrumentation corrected
Instrumentation corrected
Purge completed
Compressor shut down
Terminated startup attempt
Terminated startup attempt
TIC restarted
TIC restarted. Low pressure flare event
TIC 1808 shutdown for further mechanical work. HP flare event.
..
DATE
02101/04
02101/04
02102104
02102104
02103/04
02103/04
02104/04
02104/04
02105/04
02106/04
02106/04
TIME
0119-0120
0502-0516
0632-0633
0752-0753
0844-0846
0927-0933
1551-1555
1705-1711
0211-0227
0350-0407
2031-2055
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-04
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
Total Flare <= 1 Hour 32
Total Flare> 1 Hour 0
Volume Flared 32
Measured Safety Pilot 125
Continuous Assist 109
TOTAL FLARED 266
o
2
o
o
o
5
3
4
1
o
17
Purging 1808 compressor
Turbine 1800 chut down due to low suction pressure
Turbine surged
Turbine surged
Compressor 1808 pre-start purge
Compressor 1808 startup attempt
Flare due to attempting to start 1808
Flare due to attempting to start 1808
STV/IP 1800 TIC went down on low suction pressure
STV/IP 1800 TIC went down on low suction pressure due to pressure
TIC 1808 startup attempt
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Planned
Purge completed
Restarted turbine
Instrumentation corrected
Instrumentation corrected
Purge completed
Compressor shut down
Terminated startup attempt
Terminated startup attempt
TIC restarted
TIC restarted. Low pressure flare event
TIC 1808 shutdown for further mechanical work. HP flare event.
.. .
Facility
LISBURNE PRODUCTION CENTER #1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
operator I Field(s)
BP EXPLORATION, ALASKA PRUDHOE BAY/PT MCINTYRE
Month/Year of Disposition
03/2004
Disposition
Volume MCF"
"Indicate contribution of each pool to total.
1. Sold
140,863
Pool Name
Code
Percent
2. Reinjected (includes MI from PBU CGF)
3. Flared or vented less than 1 hour.
o
LISBURNE
NIAKUK
N_PRUDHOE
PTMAC
W _BEACH
West Niakuk
640144
640148
640152
666100
640186
640149
54.04%
2.60%
0.00%
42.59%
0.00%
0.77%
11,248,089
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235)
o
5. Pilot and Purge
13,864
6. Used for lease operations
Fuel
Assist
1,031,206
15,856
7. Other
Lift Gas, Off Field
101,797
TOTAL items 1 - 7
12,551,675
1. Safety
MCF
8. NGL gas equivalent produced
140,863
2. Lease Use
MCF
9. Purchased gas
o
3. Conserv. Purposes
MCF
10. Transferred from: PBU Central Gas Facility
2,310,955
Commissioner
Date
11. Transferred to:
o
if that the f~~Oing is true and correct t~ the best of my kpowledge.
Signature . ,~V'--. Title: \J~. (~¿t Date:
Form 10-422 (Revise /95)
LIc/~[ (Jl1
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
Remarks:
DATE
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
TIME
Total Flare <= 1 Hour
Total Flare> 1 Hour
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-04
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
o
o
o
7,495
9,129
16,624
DATE
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
TIME
Total Flare <= 1 Hour
Total Flare> 1 Hour
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-04
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
o
o
o
5,905
6,139
12,044
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-04
DATE
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-04
DATE
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-04
DATE
TIME
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 360
Continuous Assist 461
TOTAL FLARED 821
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-04
DATE
TIME
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 104
Continuous Assist 127
TOTAL FLARED 231
/Facility
LISBURNE PRODUCTION CENTER #1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
operator Field(S)
BP EXPLORATION, ALASKA PRUDHOE BAY/PT MCINTYRE
Month/Year of Disposition
04/2004
Disposition
Volume MCF"
"Indicate contribution of each pool to total.
1. Sold
135,064
3. Flared or vented less than 1 hour.
3,376
Pool Name Code Percent
LlSB 640144 53.63%
NIA 640148 2.51%
NPBS 640152 0.00%
PTM 666100 43.21 %
WBE 640186 0.00%
WNIA 640149 0.65%
2. Reinjected
10,645,623
4. Flared or vented greater than 1 hour
(Supplemental report required-oSee 20 AAC 25.235)
o
5. Pilot and Purge
13,399
6. Used for lease operations
Fuel
Assist
7. Other
Lift Gas, Off Field
989,562
51,817
;72,887
TOTAL items 1 - 7
11,911,728
1. Safety
MCF
8. NGL gas equivalent produced
135,064
2. Lease Use
MCF
9. Purchased gas
o
3. Conserv. Purposes
MCF
10. Transferred from:
2,148,602:
bomm'issioner
Date
11. Transferred to:
o
Remarks:
f'i:Jote: "II volumes must be corrected to pressure of 14.65
~sia a~d to a temperature of 60 degrees F. Report due by
tþe 20th of the month following the month of disposition.
Authority 20 MC 25.235.
I hereby certify hat the foregoing is true and correct to the best of my knòwledgé.
Signature: ~ -J" Title:~' ~ ! Date: ~7""~"'" cJ'I
Form 10-422 (Revised 95)
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-04
DATE
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
4/22/2004
4/30/2004
0055-1101
2346-2351
1,285
132
Intermittent. 1807 Compressor SD due to power supply malfunction
SD 1807 compressor for maintenance
Unplanned
Unplanned
Field production was cut to lower gas prod. until compressor restart
Depressurization complete
Total Flare <= 1 Hour 1,417
Total Flare> 1 Hour 0
Volume Flared 1,417
Measured Safety Pilot 7,165
Continuous Assist 26,916
TOTAL FLARED 35,498
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-04
DATE
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
04/22/04
04/30/04
1,705
119
0055-1101
2346-2351
Total Flare <= 1 Hour 1,824
Total Flare> 1 Hour 0
Volume Flared 1,824
Measured Safety Pilot 5,810
Continuous Assist 23,222
TOTAL FLARED 30,856
Intermittent. 1807 Compressor SD due to power supply malfunction
SD 1807 compressor for maintenance
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Field production was cut to lower gas prod. until compressor restart
Depressurization complete
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-04
DATE
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
04/22/04
04/30/04
0055-1101
2346-2351
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
o
o
Intermittent. 1807 Compressor SD due to power supply malfunction
SD 1807 compressor for maintenance
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Field production was cut to lower gas prod. until compressor restart
Depressurization complete
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-04
DATE
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
04/22/04
04/30/04
0055-1101
2346-2351
o
o
Intermittent. 1807 Compressor SD due to power supply malfunction
SD 1807 compressor for maintenance
Unplanned
Unplanned
Field production was cut to lower gas prod. until compressor restart
Depressurization complete
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-04
DATE
TIME
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
04/22/04
04/30/04
0055-1101
2346-2351
95
7
Total Flare <= 1 Hour 102
Total Flare> 1 Hour 0
Volume Flared 102
Measured Safety Pilot 338
Continuous Assist 1,326
TOTAL FLARED 1,766
Intermittent. 1807 Compressor SD due to power supply malfunction
SD 1807 compressor for maintenance
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Field production was cut to lower gas prod. until compressor restart
Depressurization complete
or
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-04
DATE
TIME
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
04122/04
04/30/04
0055-1101
2346-2351
Total Flare <= 1 Hour 33
Total Flare> 1 Hour 0
Volume Flared 33
Measured Safety Pilot 86
Continuous Assist 353
TOTAL FLARED 472
32
1
Intermittent. 1807 Compressor SD due to power supply malfunction
SD 1807 compressor for maintenance
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Field production was cut to lower gas prod. until compressor restart
Depressurization complete
I Facility
LISBURNE PRODUCTION CENTER #1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
I Operator I Field(s)
BP EXPLORATION, ALASKA PRUDHOE BAY/PT MCINTYRE
Month/Year of Disposition
04/2004
Disposition
Volume MCF"
"Indicate contribution of each pool to total.
1. Sold
135,064
Pool Name
2. Reinjected
LlSB
NIA
NPBS
PTM
WBE
WNIA
10,645,623
640144
640148
640152
666100
640186
640149
3. Flared or vented less than 1 hour.
o
4. Flared or vented greater than 1 hour
(Supplemental report requirednSee 20 AAC 25.235)
o
5. Pilot and Purge
13,399
6. Used for lease operations
Fuel
Assist
7. Other
Lift Gas, Off Field
TOTAL items 1 - 7
11,908,352
1. Safety
8. NGL gas equivalent produced
135,064
2. Lease Use
9. Purchased gas
o
3. Conserv. Purposes
10. Transferred from: C~ <::,. F
2,148,602
Commissioner
Date
11. Transferred to:
o
Percent
53.63%
2.51%
0.00%
43.21 %
0.00%
0.65%
MCF
MCF
MCF
Remarks:
('
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
I hereby ce~ t~ thf fOregOin~iS true and correct to the best of my knowledge.
Signature: k'· U.I~I^ J.A. Title: (II\.<.:.(L ïP<)( Date: .s'(~(oV
Form 10-422 (Revised 4/95)
DATE
4/22/2004
4/30/2004
Volume Flared
TIME
0055-1101
2346-2351
Total Flare <= 1 Hour
Total Flare> 1 Hour
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-04
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
1,285
132
1,417
1,417
7,165
26,916
35,498
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Intermittent. 1807 Compressor SD due to power supply malfunction
SD 1807 compressor for maintenance
Unplanned
Unplanned
o
Field production was cut to lower gas prod. until compressor restart
Depressurization complete
DATE
04/22/04
04/30/04
Volume Flared
TIME
0055-1101
2346-2351
Total Flare <= 1 Hour
Total Flare> 1 Hour
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-04
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
1,705
119
1,824
1,824
5,810
23,222
30,856
Intermittent. 1807 Compressor SD due to power supply malfunction
SD 1807 compressor for maintenance
o
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Field production was cut to lower gas prod. until compressor restart
Depressurization complete
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-04
DATE
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
04/22/04
04/30/04
0055-1101
2346-2351
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
o
o
Intermittent. 1807 Compressor SD due to power supply malfunction
SD 1807 compressor for maintenance
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Field production was cut to lower gas prod, until compressor restart
Depressurization complete
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-04
DATE
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
04/22/04
04/30/04
0055-1101
2346-2351
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
o
o
Intermittent. 1807 Compressor SD due to power supply malfunction
SD 1807 compressor for maintenance
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Field production was cut to lower gas prod. until compressor restart
Depressurization complete
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-04
DATE
TIME
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
04/22/04
04/30/04
0055-1101
2346-2351
95
7
Total Flare <= 1 Hour 102
Total Flare> 1 Hour 0
Volume Flared 102
Measured Safety Pilot 338
Continuous Assist 1,326
TOTAL FLARED 1,766
Intermittent. 1807 Compressor SD due to power supply malfunction
SD 1807 compressor for maintenance
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Field production was cut to lower gas prod. until compressor restart
Depressurization complete
DATE
04/22/04
04/30/04
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-04
TIME
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
0055-1101
2346-2351
Total Flare <= 1 Hour 33
Volume Flared 33
Total Flare> 1 Hour 0
Measured Safety Pilot 86
Continuous Assist 353
TOTAL FLARED 472
32
1
Intermittent. 1807 Compressor SD due to power supply malfunction
SD 1807 compressor for maintenance
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Field production was cut to lower gas prod. until compressor restart
Depressurization complete
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
\2. Facility Name
PBU LISBURNE PROD (GPMA)
Disposition
1. Facility Number
0290000009
6. Sold
7. Reinjected
8. Flared or vented 1 hour or less
9. Flared or vented more than 1 hour (see instr.)
10. Pilot and Purge
11. Used for lease operations (specify in Remarks)
12. Other (see instructions)
13. TOTAL VOLUME (ITEMS 6-12)
14. NGL Gas Equivalent
15. Purchased gas
16. Transferred from:
17. Transferred to: (Express as a negative #) CGF
3. Field
PBU - GPMA
Volume MCF
130,465
10,653,325
30
5,349
12,626
1,030,323
109,371
11,941,489
130,465
o
2,082,320
o
14. Operator 15. Month/Year of Disposition
BP May-2004
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
Pool Name Pool Code Percent
Lisburne 640144 47.9%
Niakuk 640148 2.5%
North Prudhoe Bay State 640152 0.0%
Pt. Mcintyre 666100 49.0%
./ West Beach 640186 0.0%
West Niakuk 640149 0.7%
Authorization> 1 hr;
MCF
~
Safety
,6;~
MCF
Lease Use
MCF
Conservation
Waste: MCF
c,,"m.'''oo~ o.'õ7/lJj9-
18. Remarks: Block II: Fuel Gas = 984,708 mscf and Assist Gas = 45,615 mscf; Block 12: Lift Gas Off Field; Block 16: MI Gas from Prudhoe
'h":,:::::19;"Æ::; ,oo¡: my 'MM,dg'
Printed Name Robert A. Reynolds
Form 10-422 Rev. 1/2004
~~
Title M::lnag"", S1are I axes äm.! ACfyB1ty
Phone (907)564-5028 Date b/~~/o y
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authoritv 20 AAC25.235.
Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACiliTY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
12. Facility Name
PBU LISBURNE PROD (GPMA)
Disposition
6. Sold
7. Reinjected
8. Flared or vented 1 hour or less
9. Flared or vented more than 1 hour (see instr.)
10. Pilot and Purge
11. Used for lease operations (specify in Remarks)
12. Other (see instructions)
13. TOTAL VOLUME (ITEMS 6-12)
14. NGL Gas Equivalent
15. Purchased gas
16. Transferred from:
17. Transferred to: (Express as a negative #) CGF
3. Field
PBU - GPMA
Volume MCF
130,465
10,658,704
30
5,349
12,626
1,030,323
109,371
11,946,868
130,465
o
2,082,320
o
14. Operator 5. MonthlYear of Disposition
BP May-2004
20. For production from multiple pools. list contribution of each pool as a percent of
Total Volume.
Pool Name Pool Code Percent
Lisburne 640144 47.9%
Niakuk 640148 2.5%
North Prudhoe Bay State 640152 0.0%
Pt. Mcintyre 666100 49.0%
West Beach 640186 0.0%
West Niakuk 640149 0.7%
Authorization> 1 hr:
Safety
MCF
MCF
Lease Use
Conservation
MCF
Waste:
MCF
18. Remarks: Block II: Fuel Gas = 984,708 mscf and Assist Gas = 45,615 mscf; Block 12: Lift Gas Off Field; Block 16: MI Gas from Prudhoe
I hereby certify that the foregoing is true and correct to the best of my knowledge.
~M,"m~ ~.~ -h-r
Printed Name Robert A. Reynolds
Form 10-422 Rev. 1/2004
Title Manager, State Taxes and Roya'7
Phone (907)564-5028 Date 10(' b / 0 y
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authoritv 20 AAC25.235.
Submit in Duplicate
DATE
5/1/2004
5/1/2004
5/1/2004
5/1/2004
5/1/2004
5/21/2004
Volume Flared
TIME
0229-0230
0242-0243
0346-0347
0501-0502
1814-1816
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-04
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
Total Flare <= 1 Hour 17
1200-1331
Total Flare> 1 Hour
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
2,419
2,419
2,436
6,059
22,503
30,998
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
1
3
3
5
5
Purging system to do maintenance on turbine 1807
Purging system to do maintenance on turbine 1807
Purging system to do maintenance on turbine 1807
Purging system to do maintenance on turbine 1807
Purging system to do maintenance on turbine 1807
Planned
Planned
Planned
Planned
Planned
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Turbine 1808 shut down
Unplanned Gas rate reduced and turbine restarted
DATE
05/01/04
05/01/04
05/01/04
05/01/04
05/01/04
05/21/04
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
TIME
0229-0230
0242-0243
0346-0347
0501-0502
1814-1816
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-04
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
Total Flare <= 1 Hour 13
1200-1331
Total Flare> 1 Hour
2,741
2,741
2,754
6,177
21,943
30,874
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
o
3
3
3
4
Purging system to do maintenance on turbine 1807
Purging system to do maintenance on turbine 1807
Purging system to do maintenance on turbine 1807
Purging system to do maintenance on turbine 1807
Purging system to do maintenance on turbine 1807
Planned
Planned
Planned
Planned
Planned
Turbine 1808 shut down
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Unplanned Gas rate reduced and turbine restarted
DATE
05/01/04
05/01/04
05/01/04
05/01/04
05/01/04
05/21/04
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-04
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
0229-0230
0242-0243
0346-0347
0501-0502
1814-1816
Total Flare <= 1 Hour 0
1200-1331
Volume Flared 0
Total Flare> 1 Hour 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
o
o
o
o
o
Purging system to do maintenance on turbine 1807
Purging system to do maintenance on turbine 1807
Purging system to do maintenance on turbine 1807
Purging system to do maintenance on turbine 1807
Purging system to do maintenance on turbine 1807
Planned
Planned
Planned
Planned
Planned
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
o
Turbine 1808 shut down
Unplanned Gas rate reduced and turbine restarted
DATE
05/01/04
05/01/04
05/01/04
05/01/04
05/01/04
05/21/04
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-04
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
0229-0230
0242-0243
0346-0347
0501-0502
1814-1816
Total Flare <= 1 Hour 0
1200-1331
Volume Flared 0
Total Flare> 1 Hour 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
o
o
o
o
o
Purging system to do maintenance on turbine 1807
Purging system to do maintenance on turbine 1807
Purging system to do maintenance on turbine 1807
Purging system to do maintenance on turbine 1807
Purging system to do maintenance on turbine 1807
Planned
Planned
Planned
Planned
Planned
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
o
Turbine 1808 shut down
Unplanned Gas rate reduced and turbine restarted
DATE
05/01/04
05/01/04
05/01/04
05/01/04
05/01/04
05/21/04
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-04
TIME
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
0229-0230
0242-0243
0346-0347
0501-0502
1814-1816
Total Flare <= 1 Hour 0
1200-1331
150
Volume Flared 150
Total Flare> 1 Hour 150
Measured Safety Pilot 306
Continuous Assist 942
TOTAL FLARED 1,398
o
o
o
o
o
Purging system to do maintenance on turbine 1807
Purging system to do maintenance on turbine 1807
Purging system to do maintenance on turbine 1807
Purging system to do maintenance on turbine 1807
Purging system to do maintenance on turbine 1807
Planned
Planned
Planned
Planned
Planned
Turbine 1808 shut down
Unplanned
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Gas rate reduced and turbine restarted
DATE
05/01/04
05/01/04
05/01/04
05/01/04
05/01/04
05/21/04
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-04
TIME
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
0229-0230
0242-0243
0346-0347
0501-0502
1814-1816
Total Flare <= 1 Hour 0
1200-1331
Volume Flared 39
Total Flare> 1 Hour 39
Measured Safety Pilot 84
Continuous Assist 227
TOTAL FLARED 350
o
o
o
o
o
Purging system to do maintenance on turbine 1807
Purging system to do maintenance on turbine 1807
Purging system to do maintenance on turbine 1807
Purging system to do maintenance on turbine 1807
Purging system to do maintenance on turbine 1807
Planned
Planned
Planned
Planned
Planned
39
Turbine 1808 shut down
Unplanned
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Gas rate reduced and turbine restarted
REPORT NO: 04-0158
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: LPC DATE: 01 May 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 02:29 02:30 OHrs 1 Mins 0 0 ~ 1 MSCF
2. Flare/Relief Valve 02:42 02:43 OHrs 1 Mins 0 0 ~ 6 MSCF
3. Flare/Relief Valve 03:46 03:47 OHrs 1 Mins 0 0 ~ 6 MSCF
4. Flare/Relief Valve 05:01 05:02 OHrs 1 Mins 0 0 ~ 8 MSCF
5. Flare/Relief Valve 18:14 18:16 OHrs 2Mins 0 0 ~ 9 MSCF
TOTAL VOLUME 30 MSCF
First Determination of Cause:
1. Purging system to do maintenace on turbine 1807
2. Purging system to do maintenace on turbine 1807
3. Purging system to do maintenace on turbine 1807
4. Purging system to do maintenace on turbine 1807
5. Purging system to do maintenace on turbine 1807
Action Taken to Stop Flaring:
1. Purge completed
2. Purge completed
3. Purge completed
4. Purge completed
5. Purge completed
Tuesday, May 25, 2004
Page 1 of 1
, .
. .
REPORT NO: 04-0183
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: LPC
DATE: 21 May 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 12:00 13:31 1 Hrs 31 Mins 0 ~ 0 5,349 MSCF
TOTAL VOLUME 5,349 MSCF
First Determination of Cause:
1. Turbine 1808 shut down.
Action Taken to Stop Flaring:
1. Gas rate reduced and turbine restarted.
Tuesday, May 25, 2004
Page 1 of 1
, .
" .
STATE OF ALASKA
ALASKA Oil AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
12. Facility Name
PBU LISBURNE PROD (GPMA)
Disposition
1. Facility Number
0290000009
6. Sold
7. Reinjected
8. Flared or vented 1 hour or less
9. Flared or vented more than 1 hour (see instr.)
10. Pilot and Purge
11. Used for lease operations (specify in Remarks)
12. Other (see instructions)
13. TOTAL VOLUME (ITEMS 6-12)
14. NGL Gas Equivalent
15. Purchased gas
16. Transferred from:
3. Field
PBU - GPMA
Volume MCF
107,770
9,562,690
1,272
5,804
12,081
918,091
119,820
10,727,528
107,770
o
1,722,453
14. Operator 15. Month/Year of Disposition
BP June-2004
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
Pool Name Pool Code Percent
Lisburne 640144 40.3%
Niakuk 640148 2.4%
.North Prudhoe Bay State 640152 0.0%
./ Pt. Mcintyre 666100 56.7%
West Beach 640186 0.0%
West Niakuk 640149 0.6%
Authorization> 1 hr:
'.- '''Å MCF
':) 8 u-r
I
MCF
.~f2-
Safety
Lease Use
Waste:
MCF
Conservation
MCF
O Commissio er J
17. Transferred to: (Express as a negative #) CGF ./
18. Remarks: Block II: Fuel Gas = 902,963 mscf and Assist Gas = 15,128 mscf; Block 12: Lift Gas Off Field; Block 16: MI Gas from Prudhoe
Date tf(joý
I hereby certify that the fOregOinf is true and correct to the best of my knowledge.
Signature Q ~ 0 ./UA r2 »-
Printed Name Robert A. Reynolds
Form 10-422 Rev. 1/2004
Date 7/'1-Ó/b'(
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authoritv 20 AAC25.235.
Phone (907)564-5028
Title Manager, State Taxes and Royalty
Submit in Duplicate
DATE
6/17/2004
6/1712004
6/23/2004
6/17/2004
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-04
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
0000-0019
1207-1331
1439-1522
10
276
142
Total Flare <= 1 Hour 428
2244-2400
2,062
Volume Flared 2,490
Total Flare> 1 Hour 2,062
Measured Safety Pilot 4,844
Continuous Assist 5,692
TOTAL FLARED 13,026
Reinjection Gas Turbine 1808 Shutdown
STVIIP compressor 1800 shut down due to instrumentation error
Turbine 1801 shut down due to instrumentation error
Unplanned
Unplanned
Unplanned
Reinjection Gas Turbine 1808 Shutdown
Notified drillsites to cut gas into plant. Restarted turbine.
Restarted compressor
Started tu rbine 1800
Unplanned Notified drjllsites to cut gas into plant. Restarted turbine.
DATE
06/17/04
06/17/04
06/23/04
06/17/04
Volume Flared
TIME
0000-0019
1207-1331
1439-1522
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-04
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
15
573
215
Total Flare <= 1 Hour 803
2244-2400
Total Flare> 1 Hour
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
3,562
3,562
4,365
6,874
8,981
20,220
Reinjection Gas Turbine 1808 Shutdown
STV/IP compressor 1800 shut down due to instrumentation error
Turbine 1801 shut down due to instrumentation error
Reinjection Gas Turbine 1808 Shutdown
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Notified drillsites to cut gas into plant. Restarted turbine.
Restarted compressor
Started turbine 1800
Unplanned Notified drillsites to cut gas into plant. Restarted turbine.
DATE
06/17/04
06/17/04
06/23/04
06/17/04
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-04
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
0000-0019
1207-1331
1439-1522
Tota/'Flare <= 1 Hour 0
2244-2400
Volume Flared 0
Total Flare> 1 Hour 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
o
o
o
Reinjection Gas Turbine 1808 Shutdown
STV/IP compressor 1800 shut down due to instrumentation error
Turbine 1801 shut down due to instrumentation error
o
Reinjection Gas Turbine 1808 Shutdown
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Notified drillsites to cut gas into plant. Restarted turbine.
Restarted compressor
Started turbine 1800
Unplanned Notified drillsites to cut gas into plant. Restarted turbine.
DATE
06/17/04
06/17/04
06/23/04
06/17/04
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-04
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
0000-0019
1207-1331
1439-1522
Total Flare <= 1 Hour 0
2244-2400
Volume Flared 0
Total Flare> 1 Hour 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
o
o
o
Reinjection Gas Turbine 1808 Shutdown
STV/IP compressor 1800 shut down due to instrumentation error
Turbine 1801 shut down due to instrumentation error
o
Reinjection Gas Turbine 1808 Shutdown
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Notified drillsites to cut gas into plant. Restarted turbine.
Restarted compressor
Started turbine 1800
Unplanned Notified drillsites to cut gas into plant. Restarted turbine.
DATE
06/17/04
06/17/04
06/23/04
06/17/04
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-04
TIME
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
0000-0019
1207-1331
1439-1522
Total Flare <= 1 Hour 33
2244-2400
Volume Flared 177
Total Flare> 1 Hour 144
Measured Safety Pilot 289
Continuous Assist 360
TOTAL FLARED 826
2
22
9
Reinjection Gas Turbine 1808 Shutdown
STVIIP compressor 1800 shut down due to instrumentation error
Turbine 1801 shut down due to instrumentation error
144
Reinjection Gas Turbine 1808 Shutdown
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Notified drillsites to cut gas into plant. Restarted turbine.
Restarted compressor
Started turbine 1800
Notified drill sites to cut gas into plant. Restarted turbine.
"
DATE
06/17/04
06/17/04
06/23104
06/17/04
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-04
TIME
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
0000-0019
1207-1331
1439-1522
Total Flare <= 1 Hour 8
2244-2400
Volume Flared 44
Total Flare> 1 Hour 36
Measured Safety Pilot 74
Continuous Assist 95
TOTAL FLARED 213
o
6
2
Reinjection Gas Turbine 1808 Shutdown
STV/IP compressor 1800 shut down due to instrumentation error
Turbine 1801 shut down due to instrumentation error
36
Reinjection Gas Turbine 1808 Shutdown
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Notified drill sites to cut gas into plant. Restarted turbine.
Restarted compressor
Started turbine 1800
Notified drill sites to cut gas into plant. Restarted turbine.
FACILITY: LPC
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
REPORT NO: 04-0231
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 17 Jun 2004
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
00:00 00:19 OHrs 19 Mins ~ ~ 0 877 MSCF
22:44 24:00 1 Hrs 16 Mins ~ ~ 0 5,804 MSCF
TOTAL VOLUME 6,681 MSCF
First Determination of Cause:
1. Reinjection Gas Turbine 1808 Shutdown
2. Reinjection Gas Turbine 1808 Shutdown
Action Taken to Stop Flaring:
1. Notified Drillsites to start cutting gas into the plant
Notified LPC Operators that unit was down and needed to be restarted
Opened Assist Gas
2. Notified Drillsites to start cutting gas into the plant
Notified LPC Operators that unit was down and needed to be restarted
Opened Assist Gas
Friday, June 18, 2004
.
,
Page 1 of 1
REPORT NO: 04-0224
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: LPC
DATE: 17 Jun 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 12:07 13:31 1 Hrs 24 Mins 0 0 0 27 MSCF
TOTAL VOLUME
27 MSCF
First Determination of Cause:
1. Turbine 1801 shut down due to digital intrumentation error.
Action Taken to Stop Flaring:
1. Started turbine 1800.
Friday, June 18, 2004
Page 1 of 1
.
,
~
,
GPB Flaring Incidents
To:
Steve McMains, AOGCC
steve mcmains@admin.state.ak.us
907-793-1241, fax 907-276-7542
From:
Hal Tucker, GPB Prod Optim Team Leader,
907-659-4472
Several extended flare events occurred in the past few
weeks at GPB. This is a note giving you a courtesy "heads up" on the
greater than one hour flare events you will be seeing in the monthly gas
disposition reports prepared by the Anchorage Volume Accounting Team.
* GC3 experienced three flare events on June 24, 25 and 26 due to
K5500 shutting down on high lube oil temperature. Temperature probes,
RTD's and switches were changed out during the three days in attempts to
eliminate that root cause of the shut downs. K5500 procedures were
followed to minimize flaring. Total volume for the three events was
1,261 MSCF, total duration for the three events was 7 hours and 17
minutes.
* FS1 experienced one extended flare event beginning at 10:00 June
17 and ending at 02:45 June 18 when the 1801 STV/IP compressor shut down
due to high ambients. Several attempts were made to restart and reload
the machine. Total flare volume for the event was 8,491 MSCF over 16
hours and 45 minutes.
* GC2 experienced two flare events on May 30 and 31 due to PLC
malfunction in the produced water section of the plant. The production
cuts resulting from the water section upset caused the skid 18, IP and
LP compressors to surge intermittently due to the low GC oil rate. The
compressors loaded up as GC2 oil rates returned to normal. Total volume
for the two events was 920 MSCF, total duration was 5 hours and 31
minutes.
* CGF experienced two flare events on June 17 and 18. The first
event occurred when the 1884 tandem shut down 3 times due to high
ambient temperatures over a 2 hour period. Each shut down resulted in 15
minutes of flaring. This event should have been captured as three
separate flaring events and should not be considered as a greater than
one hour event. The second event occurred when the 1805 MI compressor
shut down a recycle trip while loading the boosters. Flaring stopped
when 1805 was restarted. Total duration for the 1805 event was 1 hour
and 14 minutes, total volume was 8,677 MSCF.
* ~experienced one flare event on June 17 when the 1808 gas
reinjec~turbine shut down. Flaring stopped when 1808 was restarted.
laf2
6/28/20047:02 AM
GPB Flaring Incidents
~Gas was cut during the event to reduce flare volume. Total duration for
the event was 1 hour and 16 minutes, total volume was 5,804 MSCF.
* FS3 experienced two flare events on June 17 and June 20. The
first event occurred when the 1801 STV/IP compressor shut down due to
high ambients and plant upsets. After three failed restart attempts, the
spare machine (1802) was startedt ending the flare event. Total duration
for this event was 1 hour and 10 minutest total volume was 466 MSCF. The
second event occurred when the 1806 gas lift machine shut down due to
instrumentation problems. 1806 was secured and depressured, ending the
flare event. Total duration of the event was 6 hours of intermittent
flaring totaling 685 MSCF.
If you require additional information, please do not
hesitate to call me.
Hal Tucker
GPB Production Optimization TL
2'of2
6/28/2004 7:02 AM
STATE OF ALASKA
ALASKA Oil AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
o
1,796,940 'rf) ~ Iø I. rt
o ¡,,, 7rPT Dare
18. Remarks: Block 11: Fuel Gas = 884,755 mscf and Assist Gas = 169,525 mscf; Block 12: Lift Gas Off Field; Block 16: MI Gas from Prudhoe
1. Facility Number
0290000009
12. Facility Name
PBU LISBURNE PROD (GPMA)
Disposition
3. Field
PBU - GPMA
Volume MCF
6. Sold
75,015
7. Reinjected
9,465,413
8. Flared or vented 1 hour or less
504
9. Flared or vented more than 1 hour (see instr.)
3,703
10. Pilot and Purge
12,448
11. Used for lease operations (specify in Remarks)
1,054,280
12. Other (see instructions)
120,147
13. TOTAL VOLUME (ITEMS 6-12)
10,731,510
14. NGL Gas Equivalent
75,015
15. Purchased gas
16. Transferred from:
17. Transferred to: (Express as a negative #) CGF
I hereby certify th~ foregoi g is true and correct to the best of my knowledge.
Signature k(..Q
14. Operator 15. MonthlYear of Disposition
BP July-2004
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
Pool Name Pool Code Percent
Lisburne 640144 38.4%
Niakuk 640148 1.8%
North Prudhoe Bay State 640152 0.0%
PI. McIntyre 666100 58.8%
~ West Beach 640186 0.4%
West Niakuk 640149 0.7%
Authorization> 1 hr:
MCF
3(7D3
ð~
Safety
MCF
MCF
MCF
Date 'è/I<ø(OY
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authoritv 20 AAC25.235.
Printed Name
Robert A. Reynolds
Phone (907)564-5028
Title Manager, State Taxes and Royalty
Form 10-422 Rev. 1/2004
Submit in Duplicate
DATE
7/14/2004
7/19/2004
7/19/2004
7/24/2004
7/24/2004
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
TIME
0013-0029
1202-1222
1222-1235
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul-04
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
Total Flare <= 1 Hour 178
1227-1430
1430-1820
Total Flare> 1 Hour
1,226
52
1,278
1,456
4,784
72,389
78,629
65
71
42
Compressor 1800 shutdown due to high exhaust temperature
Compressor 1800 shutdown on low suction pressure
Compressor 1800 shutdown on low suction pressure
Instrumentation problem with comp 1808, oil tank & hydraulic system problems
Instrumentation problem with comp 1808, oil tank & hydraulic system problems
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Planned
Restarted compressor
Turned on assist gas, manually blocked flare tips and restarted
Turned on assist gas, manually blocked flare tips and restarted
Problems repaired and compressor restarted
Problems repaired and compressor restarted
DATE
07/14/04
07/19/04
07119/04
07/24/04
07124/04
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
TIME
0013-0029
1202-1222
1222-1235
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul-04
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
107
130
75
Total Flare <= 1 Hour 312
1227-1430
1430-1820
Total Flare> 1 Hour
2,210
95
2,305
2,617
7,306
92,629
102,552
Compressor 1800 shutdown due to high exhaust temperature
Compressor 1800 shutdown on low suction pressure
Compressor 1800 shutdown on low suction pressure
Instrumentation problem with comp 1808, oil tank & hydraulic system
Instrumentation problem with comp 1808, oil tank & hydraulic system
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Planned
Restarted compressor
Turned on assist gas, manually blocked flare tips and restarted
Turned on assist gas, manually blocked flare tips and restarted
Problems repaired and compressor restarted
Problems repaired and compressor restarted
DATE
07/14/04
07/19/04
07/19/04
07/24/04
07/24/04
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul-04
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
0013-0029
1202-1222
1222-1235
Total Flare <= 1 Hour 0
1227-1430
1430-1820
Volume Flared 0
Total Flare> 1 Hour 0
Measured Safety Pilot 46
Continuous Assist 563
TOTAL FLARED 609
o
o
o
Compressor 1800 shutdown due to high exhaust temperature
Compressor 1800 shutdown on low suction pressure
Compressor 1800 shutdown on low suction pressure
o
o
Instrumentation problem with comp 1808, oil tank & hydraulic system
Instrumentation problem with comp 1808, oil tank & hydraulic system
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Restarted compressor
Turned on assist gas, manually blocked flare tips and restarted
Turned on assist gas, manually blocked flare tips and restarted
Unplanned Problems repaired and compressor restarted
Planned Problems repaired and compressor restarted
DATE
07/14/04
07/19/04
07/19/04
07/24/04
07/24/04
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul-04
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
0013-0029
1202-1222
1222-1235
Total Flare <= 1 Hour 0
1227-1430
1430-1820
Volume Flared 0
Total Flare> 1 Hour 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
o
o
o
Compressor 1800 shutdown due to high exhaust temperature
Compressor 1800 shutdown on low suction pressure
Compressor 1800 shutdown on low suction pressure
o
o
Instrumentation problem with comp 1808, oil tank & hydraulic system
Instrumentation problem with comp 1808, oil tank & hydraulic system
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Planned
Restarted compressor
Turned on assist gas, manually blocked flare tips and restarted
Turned on assist gas, manually blocked flare tips and restarted
Problems repaired and compressor restarted
Problems repaired and compressor restarted
DATE
07/14/04
07/19/04
07119/04
07124/04
07124/04
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul-04
TIME
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
0013-0029
1202-1222
1222-1235
Total Flare <= 1 Hour 10
1227-1430
1430-1820
Volume Flared 88
Total Flare> 1 Hour 78
Measured Safety Pilot 222
Continuous Assist 2,837
TOTAL FLARED 3,147
4
4
2
Compressor 1800 shutdown due to high exhaust temperature
Compressor 1800 shutdown on low suction pressure
Compressor 1800 shutdown on low suction pressure
74
4
Instrumentation problem with comp 1808, oil tank & hydraulic system
Instrumentation problem with comp 1808, oil tank & hydraulic system
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Planned
Restarted compressor
Turned on assist gas, manually blocked flare tips and restarted
Turned on assist gas, manually blocked flare tips and restarted
Problems repaired and compressor restarted
Problems repaired and compressor restarted
DATE
07/14/04
07/19/04
07/19/04
07124/04
07/24/04
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul-04
TIME
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
0013-0029
1202-1222
1222-1235
Total Flare <= 1 Hour 4
1227-1430
1430-1820
Volume Flared 46
Total Flare> 1 Hour 42
Measured Safety Pilot 90
Continuous Assist 1,107
TOTAL FLARED 1,243
1
2
1
Compressor 1800 shutdown due to high exhaust temperature
Compressor 1800 shutdown on low suction pressure
Compressor 1800 shutdown on low suction pressure
40
2
Instrumentation problem with comp 1808, oil tank & hydraulic system
Instrumentation problem with comp 1808, oil tank & hydraulic system
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Planned
Restarted compressor
Turned on assist gas, manually blocked flare tips and restarted
Turned on assist gas, manually blocked flare tips and restarted
Problems repaired and compressor restarted
Problems repaired and compressor restarted
REPORT NO: 04-0311
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: LPC
DATE: 24 Jul 2004
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
12:27 14:03 1 Hrs 36Mins 0 ~ 0 3,550 MSCF
14:30 18:20 3Hrs 50Mins ~ 0 ~ 153 MSCF
TOTAL VOLUME 3,703 MSCF
First Determination of Cause:
1. Instrumentation problem with T /C 1808 overhead seal oil tank and hydraulic system problems. Black
smoke was borderline but will report as such.
2. T /C 1808 restart attempts. This is purge gas flaring.
Action Taken to Stop Flaring:
1. Instrumentation and most hydraulic problems repaired and T/C restarted.
2. T /C 1808 restarted.
Wednesday, July 28,2004
Page 1 of 1
· .. ,
~
STATE OF ALASKA
ALASKA Oil AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
12. Facility Name
PBU LISBURNE PROD (GPMA)
Disposition
3. Field
PBU - GPMA
Volume MCF
6. Sold
86,861
7. Reinjected
8,749,094
8. Flared or vented 1 hour or less
1 ,464
9. Flared or vented more than 1 hour (see instr.)
474
10. Pilot and Purge
40,799
11. Used for lease operations (specify in Remarks)
981,391
12. Other (see instructions)
158,722
13. TOTAL VOLUME (ITEMS 6-12)
10,018,805
14. NGL Gas Equivalent
86,861
15. Purchased gas
16. Transferred from:
1,573,605
17. Transferred to: (Express as a negative #) CGF
o
o
14. Operator 15. MonthlYear of Disposition
BP August-2004
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
Pool Name Pool Code Percent
Lisburne 640144 39.4%
Niakuk 640148 1.7%
./ North Prudhoe Bay State 640152 0.0%
PI. Mcintyre 666100 57.9%
./ West Beach 640186 0.3%
West Niakuk 640149 0.7%
...,/
Authorization> 1 hr:
MCF
t¡-Z4-
,",:W-
Safety
Waste:
MCF
MCF
;irf
i~1
18. Remarks: Block II: Fuel Gas = 846,472 mscf and Assist Gas = 134,919 mscf; Block 12: Lift Gas Off Field; Block 16: MI Gas from Prudhoe
I hereby certify that t~egOing i rue and correct to the best of my knowledge.
Signature ( ¿ O.
Date q //<.-!r>ý
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authoritv 20 AAC25.235.
Printed Name Robert A. Reynolds
Phone (907)564-5028
Title Manager, State Taxes and Royalty
Form 10-422 Rev. 1/2004
Submit in Duplicate
DATE
8/10/2004
8/17/2004
8/17/2004
8/17/2004
8/17/2004
8/1712004
8/17/2004
8/17/2004
8/18/2004
8/19/2004
8/20/2004
8/16/2004
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
TIME
1949-2009
1504-1506
1656-1659
1758-1802
1856-1910
1927-1930
1937-2021
2130-2132
2332-2335
0111-0152
2039-2041
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-04
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
14
18
86
255
145
16
362
3
34
141
1
1701-2322
Total Flare <= 1 Hour 1,075
240
Total Flare> 1 Hour
240
1,315
15,553
55,612
72,480
1800 STV IP compressor shutdown due to process upset
Attempted restart of reinjection turbine/compressor 52-1807
Prestart purge of reinjection turbine/compressor 52-1807
Instrument malfunction caused vent-te-flare which shutdown 52-1807
Attempted restart and prestart purge of STVIIP compressor 42-1801
Restart purge of 52-1807
Attempted restart and purge of 42-1801
Restart of STV/IP compressor 42-1801
Start attempt on TIC 1808
Starting and stopping of TIC 1808 for full rate comeback after turnaround
TIC 1800 STV/IP shut down during swapover operation with TIC 1801
Planned LPC shutdown for scheduled work during pipeline slowdown
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Planned
Planned
Unplanned
Planned
Started 1801
Purge completed
Purge completed
Shutdown completed
Purge completed
Restart completed
Purge completed
Start completed
Start attempt unsuccessful due to hydraulic problems
Started 1808
Loaded TIC 1801 back up
None
DATE
08/1 0104
08/17/04
08/17/04
08/17104
08/17/04
08/17/04
08/17/04
08/17/04
08/18/04
08/19/04
08/20/04
08/16/04
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
TIME
1949-2009
1504-1506
1656-1659
1758-1802
1856-1910
1927-1930
1937-2021
2130-2132
2332-2335
0111-0152
2039-2041
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-04
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
21
2
11
26
8
2
34
o
38
238
2
1701-2322
Total Flare <= 1 Hour 382
222
Total Flare> 1 Hour
222
604
23,940
75,904
100,448
1800 STY IP compressor shutdown due to process upset
Attempted restart of reinjection turbinelcompressor 52-1807
Prestart purge of reinjection turbinelcompressor 52-1807
Instrument malfunction caused vent-to-flare which shutdown 52-1807
Attempted restart and prestart purge of STV/IP compressor 42-1801
Restart purge of 52-1807
Attempted restart and purge of 42-1801
Restart of STVIIP compressor 42-1801
Start attempt on TIC 1808
Starting and stopping of TIC 1808 for full rate comeback after turnaround
TIC 1800 STVIIP shut down during swapover operation with TIC 1801
Planned LPC shutdown for scheduled work during pipeline slowdown
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Planned
Planned
Unplanned
Planned
Started 1801
Purge completed
Purge completed
Shutdown completed
Purge completed
Restart completed
Purge completed
Start completed
Start attempt unsuccessful due to hydraulic problems
Started 1808
Loaded TIC 1801 back up
None
DATE
08/10/04
08/17/04
08/17/04
08/17/04
08/17/04
08/17/04
08/17/04
08/17/04
08/18/04
08/19104
08/20/04
08/16/04
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-04
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
1949-2009
1504·1506
1656-1659
1758·1802
1856-1910
1927-1930
1937-2021
2130-2132
2332-2335
0111-0152
2039-2041
Total Flare <= 1 Hour 0
1701-2322
Volume Flared 0
Total Flare> 1 Hour 0
Measured Safety Pilot 258
Continuous Assist 405
TOTAL FLARED 663
o
o
o
o
o
o
o
o
o
o
o
1800 STV IP compressor shutdown due to process upset
Attempted restart of reinjection turbine/compressor 52-1807
Prestart purge of reinjection turbinelcompressor 52-1807
Instrument malfunction caused vent-to-flare which shutdown 52-1807
Attempted restart and prestart purge of STV/IP compressor 42-1801
Restart purge of 52-1807
Attempted restart and purge of 42-1801
Restart of STVIIP compressor 42-1801
Start attempt on TIC 1808
Starting and stopping of TIC 1808 for full rate comeback after turnaround
TIC 1800 STVIIP shut down during swapover operation with TIC 1801
o
Planned LPC shutdown for scheduled work during pipeline slowdown
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Planned
Planned
Unplanned
Planned
Started 1801
Purge completed
Purge completed
Shutdown completed
Purge completed
Restart completed
Purge completed
Start completed
Start attempt unsuccessful due to hydraulic problems
Started 1808
Loaded TIC 1801 back up
None
DATE
08/10/04
08/17/04
08/17/04
08/17/04
08/17/04
08/17/04
08/17/04
08/17/04
08/18/04
08/19/04
08/20/04
08/16/04
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-04
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
1949-2009
1504-1506
1656-1659
1758-1802
1856-1910
1927-1930
1937-2021
2130-2132
2332-2335
0111-0152
2039-2041
Total Flare <= 1 Hour 0
1701-2322
Volume Flared 0
Total Flare> 1 Hour 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
o
o
o
o
o
o
o
o
o
o
o
1800 STV IP compressor shutdown due to process upset
Attempted restart of reinjection turbinelcompressor 52-1807
Prestart purge of reinjection turbinelcompressor 52-1807
Instrument malfunction caused vent-to-flare which shutdown 52-1807
Attempted restart and prestart purge of STV/IP compressor 42-1801
Restart purge of 52-1807
Attempted restart and purge of 42-1801
Restart of STVIIP compressor 42-1801
Start attempt on TIC 180S
Starting and stopping of TIC 1808 for full rate comeback after turnaround
TIC 1800 STVIIP shut down during swapover operation with TIC 1801
o
Planned LPC shutdown for scheduled work during pipeline slowdown
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Planned
Planned
Unplanned
Planned
Started 1801
Purge completed
Purge completed
Shutdown completed
Purge completed
Restart completed
Purge completed
Start completed
Start attempt unsuccessful due to hydraulic problems
Started 1808
Loaded TIC 1801 back up
None
DATE
08/10/04
08/17/04
08/17/04
08/17/04
08/17/04
08/17/04
08/17/04
08/17/04
08/18/04
08/19/04
08/20/04
08/16/04
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-04
TIME
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
1949-2009
1504-1506
1656-1659
1758-1802
1856-1910
1927-1930
1937-2021
2130-2132
2332-2335
0111-0152
2039-2041
Total Flare <= 1 Hour 5
1701-2322
Volume Flared 13
Total Flare> 1 Hour 8
Measured Safety Pilot 722
Continuous Assist 2,078
TOTAL FLARED 2,813
o
o
o
o
o
o
o
o
o
5
o
1800 STV IP compressor shutdown due to process upset
Attempted restart of reinjection turbine/compressor 52-1807
Prestart purge of reinjection turbinelcompressor 52-1807
Instrument malfunction caused vent-to-flare which shutdown 52-1807
Attempted restart and prestart purge of STVIIP compressor 42-1801
Restart purge of 52-1807
Attempted restart and purge of 42-1801
Restart of STV/IP compressor 42-1801
Start attempt on TIC 1808
Starting and stopping of TIC 1808 for full rate comeback after turnaround
TIC 1800 STVIIP shut down during swapover operation with TIC 1801
8
Planned LPC shutdown for scheduled work during pipeline slowdown
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Planned
Planned
Unplanned
Planned
Started 1801
Purge completed
Purge completed
Shutdown completed
Purge completed
Restart completed
Purge completed
Start completed
Start attempt unsuccessful due to hydraulic problems
Started 1808
Loaded TIC 1801 back up
None
DATE
08/10/04
08/17/04
08/17/04
08/17/04
08/17/04
08/17/04
08/17104
08/17/04
08/18/04
08/19/04
08/20/04
08/16/04
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-04
TIME
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
1949-2009
1504-1506
1656-1659
1758-1802
1856-1910
1927-1930
1937-2021
2130-2132
2332-2335
0111-0152
2039-2041
Total Flare <= 1 Hour 2
1701-2322
Volume Flared 6
Total Flare> 1 Hour 4
Measured Safety Pilot 326
Continuous Assist 920
TOTAL FLARED 1,252
o
o
o
o
o
o
o
o
o
2
o
1800 STV IP compressor shutdown due to process upset
Attempted restart of reinjection turbinelcompressor 52-1807
prestart purge of reinjection turbinelcompressor 52-1807
Instrument malfunction caused vent-to-flare which shutdown 52-1807
Attempted restart and prestart purge of STV/IP compressor 42-1801
Restart purge of 52-1807
Attempted restart and purge of 42-1801
Restart of STV/IP compressor 42-1801
Start attempt on TIC 1808
Starting and stopping of TIC 1808 for full rate comeback after tumaround
TIC 1800 STV/IP shut down during swapover operation with TIC 1801
4
Planned LPC shutdown for scheduled work during pipeline slowdown
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Planned
Planned
Unplanned
Planned
Started 1801
Purge completed
Purge completed
Shutdown completed
Purge completed
Restart completed
Purge completed
Start completed
Start attempt unsuccessful due to hydraulic problems
Started 1808
Loaded TIC 1801 back up
None
REPORT NO: 04-0352
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: LPC
DATE: 16 Aug 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 17:01 23:22 6Hrs 21 Mins ~ 0 ~ 474 MSCF
TOTAL VOLUME
474 MSCF
First Determination of Cause:
1. Planned LPC shut down for scheduled work during pipeline slowdown
Action Taken to Stop Flaring:
1. none
VVednesday,August25,2004
Page 1 of 1
REPORT NO: 04-0374
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: LPC
DATE: 18 Aug 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 23:32 23:35 0 Hrs 3Mins 0 0 ~ 72 MSCF
TOTAL VOLUME
72 MSCF
First Determination of Cause:
1. Start attempt on T /C 1808.
Action Taken to Stop Flaring:
1. Start attempt unsuccessful due to hydraulic problems.
Thurnday,August26,2004
Page 1 of 1
REPORT NO: 04-0379
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: LPC
DATE: 19 Aug 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 01 :11 01 :52 0 Hrs 41 Mins ~ 0 !ill 386 MSCF
TOTAL VOLUME
386 MSCF
First Determination of Cause:
1. Starting and stopping of T /C 1808 for full rate comeback after turnaround. Had sme hydraulic
problems.
Action Taken to Stop Flaring:
1. Started T /C 1808.
VVednesday, August 25, 2004
Page 1 of 1
4> ~_.."'--~o x-·-~~-~~~
Gary,
I have a couple of question Jim Regg needs an answer too. I will break it down by
field.
*PBU GC-3 for August 2004* - On Aug 9th, LPS compressor Shut down because of a
problem associated with UPS power. He would like more detail to explain what
happen, associated with UPS power?
*GPMA Facility Oct 2000 thru Aug 2004* - Oct 2000, Dec 2001, Jan 2003 and Aug 2004
the facility had a sharp spike in the pilot-purge volume, from less than 15,000 mcf
to over 40,000 mcf just for those four months. Could you provide an explanation
why these sharp spike took place in pilot-purge volumes. This is the only facility
that has shown these spikes for pilot-purge volumes.
Steve
1 of 1
10/28/2004 1 :29 PM
50,000
40,000
35,000
fIJ 30,000
m
o 25,000
20,000
15,000 -
10,000
GP.MA Lisburne Pilot-Purge
°
GPMA Pilot Purge spikes in 12-2001,01-2003 and 08-2004
Steve,
Regarding your questions about abnormally high pilot purge volumes at
the LPC in Oct 2000, Dee 2001, Jan 2003 and Aug 2004 -- we have finally
figured out what happened in the 2001, 2003 and 2004 cases. It appears
that pilot purge spikes on 12/31/2001, 1/31/2003 and 8/6/2004 are a
result of bad meter data. In each case, the totalizer received
erroneous pulses resulting in a value of 29,490 mscf. When the meter
totalizer was automatically reset at midnight, the problem was cleared
up.
I will be preparing revised 10-422 gas disposition reports for these
three months with corrected pilot purge volumes. Unfortunately, we do
not have access to the October 2000 meter data (ARCO was operating GPMA
at that time). We could reasonably assume the October 2000 data was
similarly corrupted and I could prepare an estimate of the pilot purge
volume and revised 10-422 report for Oct 2000, if needed.
Let me know if you have any questions.
I'm still working on getting answers for GC-2 Sept & Oct 2004 questions
on pilot purge.
Gary Benson
Volume Accounting
Greater Prudhoe Bay
BP Exploration (Alaska)
(907) 564-4604
(907) 564-4094 fax
bensonga@bp.com
1 ~f1
1/14/20052:25 PM
STATE OF ALASKA
ALASKA Oil AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
/2. Facility Name
PBU LISBURNE PROD (GPMA)
Disposition
6. Sold
7. Reinjected
8. Flared or vented 1 hour or less
9. Flared or vented more than 1 hour (see instr.)
10. Pilot and Purge
11. Used for lease operations (specify in Remarks)
12. Other (see instructions)
13. TOTAL VOLUME (ITEMS 6-12)
14. NGL Gas Equivalent
15, Purchased gas
16. Transferred from:
17. Transferred to: (Express as a negative #) CGF
3. Field
PBU - GPMA
Volume MCF
114,837
9,740,851
658
82
9,818
1,172,415
157,368
11,196,029
114,837
o
1,233,724
o
14. Operator 15. MonthlYear of Disposition
BP September-2004
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
Pool Name Pool Code Percent
Lisburne 640144 45.0%
Niakuk 640148 1.4%
North Prudhoe Bay State 640152 0.0%
Pt. Mcintyre 666100 53.0%
/ West Beach 640186 0.0%
West Niakuk 640149 0.6%
Authorization> 1 hr:
MCF
Safety
Lease Use
~, MCF
L-' 'Z.-..
MCF
5ßf!-
,(JI/f
18. Remarks: Block 11: Fuel Gas = 1,024,942 msef and Assist Gas = 147,473 msef; Block 12: Lift Gas Off Field; Block 16: MI Gas from Prudhoe
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signaturf~ ~ t2vr-
Printed Name Robert A.~eynOldS
Form 10-422 Rev. 1/2004
Date lo --l <ö -Ol(
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authoritv 20 AAC25.235.
Phone (907)564-5028
Title Manager, State Taxes and Royalty
Submit in Duplicate
VOLUME
DATE TIME (MSCF)
9/4/2004 0441-0503 0
9/11/2004 1301-1318 0
9/11/2004 1508-1509 0
9/11/2004 1630-1631 0
9/11/2004 1745-1746 0
9/11/2004 1855-1856 0
9/11/2004 1920-1921 0
9/12/2004 0614-0616 0
9/12/2004 0845-0846 0
9/12/2004 1027-1028 0
9/12/2004 1444-1447 0
9/12/2004 1842-1844 0
9/12/2004 1903-1904 0
9/13/2004 1442-1444 0
9/13/2004 1829-1830 0
9/14/2004 1629-1632 0
9/14/2004 2036-2044 0
Total Flare <= 1 Hour 0
9/15/2004 1204-2307 0
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
4,419
66,146
TOTAL FLARED
70,565
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-04
DESCRIPTION OF INCIDENTS & CAUSE
Comp 1800 startup failed due to purge problem
Comp 1800 normal startup
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
Unload depropanizer offgas compressor 1855 and load MI compressor 1830
EOR compressor 4930 startup
o
o
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Repaired instrumentation
Started 1800
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed and MI compressor online
EOR 4930 running and online
VOLUME
DATE TIME (MSCF)
09/04/04 0441-0503 1
09/11/04 1301-1318 362
09/11/04 1508-1509 2
09/11/04 1630-1631 6
09/11/04 1745-1746 2
09/11/04 1855-1856 2
09/11/04 1920-1921 2
09/12/04 0614-0616 3
09/12/04 0845-0846 2
09/12/04 1027-1028 4
09/12/04 1444-1447 28
09/12/04 1842-1844 10
09/12/04 1903-1904 8
09/13/04 1442-1444 34
09/13/04 1829-1830 20
09/14/04 1629-1632 36
09/14/04 2036-2044 136
Total Flare <= 1 Hour 658
09/15/04 1204-2307 82
Total Flare> 1 Hour
82
Volume Flared
740
Measured Safety Pilot
Continuous Assist
5,204
78,249
TOTAL FLARED
84,193
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-04
DESCRIPTION OF INCIDENTS & CAUSE
Comp 1800 startup failed due to purge problem
Camp 1800 normal startup
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
Unload depropanizer offgas compressor 1855 and load MI compressor
EOR compressor 4930 startup
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Repaired instrumentation
Started 1800
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed and MI compressor online
EOR 4930 running and online
VOLUME
DATE TIME (MSCF)
09/04/04 0441-0503 0
09/11/04 1301-1318 0
09/11/04 1508-1509 0
09/11/04 1630-1631 0
09/11/04 1745-1746 0
09/11/04 1855-1856 0
09/11/04 1920-1921 0
09/12/04 0614-0616 0
09/12/04 0845-0846 0
09/12/04 1027-1028 0
09/12/04 1444-1447 0
09/12/04 1842-1844 0
09/12/04 1903-1904 0
09/13/04 1442-1444 0
09/13/04 1829-1830 0
09/14/04 1629-1632 0
09/14/04 2036-2044 0
Total Flare <= 1 Hour 0
09/15/04 1204-2307 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-04
DESCRIPTION OF INCIDENTS & CAUSE
Comp 1800 startup failed due to purge problem
Comp 1800 normal startup
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
Unload depropanizer offgas compressor 1855 and load MI compressor
EOR compressor 4930 startup
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Repaired instrumentation
Started 1800
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed and MI compressor online
EOR 4930 running and online
VOLUME
DATE TIME (MSCF)
09/04/04 0441-0503 0
09/11/04 1301-1318 0
09/11/04 1508-1509 0
09/11/04 1630-1631 0
09/11/04 1745-1746 0
09/11/04 1855-1856 0
09/11/04 1920-1921 0
09/12/04 0614-0616 0
09/12/04 0845-0846 0
09/12/04 1027-1028 0
09/12/04 1444-1447 0
09/12/04 1842-1844 0
09/12/04 1903-1904 0
09/13/04 1442-1444 0
09/13/04 1829-1830 0
09/14/04 1629-1632 0
09/14/04 2036-2044 0
Total Flare <= 1 Hour 0
09/15/04 1204-2307 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-04
DESCRIPTION OF INCIDENTS & CAUSE
Comp 1800 startup failed due to purge problem
Comp 1800 normal startup
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
Unload depropanizer offgas compressor 1855 and load MI compressor 1830
EOR compressor 4930 startup
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Repaired instrumentation
Started 1800
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed and MI compressor online
EOR 4930 running and online
VOLUME
DATE TIME (Mscf)
09/04/04 0441-0503 0
09/11/04 1301-1318 0
09/11/04 1508-1509 0
09/11/04 1630-1631 0
09/11/04 1745-1746 0
09/11/04 1855-1856 0
09/11/04 1920-1921 0
09/12/04 0614-0616 0
09/12/04 0845-0846 0
09/12/04 1027-1028 0
09/12/04 1444-1447 0
09/12/04 1842-1844 0
09/12/04 1903-1904 0
09/13/04 1442-1444 0
09/13/04 1829-1830 0
09/14/04 1629-1632 0
09/14/04 2036-2044 0
Total Flare <= 1 Hour 0
09/15/04 1204-2307 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 133
Continuous Assist 2,109
TOTAL FLARED 2,242
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-04
DESCRIPTION OF INCIDENTS & CAUSE
Comp 1800 startup failed due to purge problem
Comp 1800 normal startup
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
Unload depropanizer offgas compressor 1855 and load MI compressor 1830
EOR compressor 4930 startup
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Repaired instrumentation
Started 1800
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed and MI compressor online
EOR 4930 running and online
VOLUME
DATE TIME (Mscf)
09/04/04 0441-0503 0
09/11/04 1301-1318 0
09/11/04 1508-1509 0
09/11/04 1630-1631 0
09/11/04 1745-1746 0
09/11/04 1855-1856 0
09/11/04 1920-1921 0
09/12/04 0614-0616 0
09/12/04 0845-0846 0
09/12/04 1027-1028 0
09/12/04 1444-1447 0
09/12/04 1842-1844 0
09/12/04 1903-1904 0
09/13/04 1442-1444 0
09/13/04 1829-1830 0
09/14/04 1629-1632 0
09/14/04 2036-2044 0
Total Flare <= 1 Hour 0
09/15/04 1204-2307 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 62
Continuous Assist 969
TOTAL FLARED 1,031
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-04
DESCRIPTION OF INCIDENTS & CAUSE
Comp 1800 startup failed due to purge problem
Comp 1800 normal startup
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
MI compressor 1830 startup purge
Unload depropanizer offgas compressor 1855 and load MI compressor
EOR compressor 4930 startup
..
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Repaired instrumentation
Started 1800
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed
Purge completed and MI compressor online
EOR 4930 running and online
REPORT NO: 04-0443
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: LPC
DATE: 15 Sep 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1_ Flare/Relief Valve 12:04 23:07 11 Hrs 3 Mins ~ 0 0 82 MSCF
TOTAL VOLUME
82 MSCF
First Determination of Cause:
1. 4930 EOR Compressor Start-up
Flared a total of 17 minutes.
Action Taken to Stop Flaring:
1. Compressor running and on line.
Monday, September 27, 2004
Page 1 of 1
1. Facility Number
0290000009
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
12. Facility Name
PBU LISBURNE PROD (GPMA)
Disposition
3. Field
PBU - GPMA
Volume MCF
14. Operator 15. MonthlYear of Disposition
BP October-2004
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
8. Flared or vented 1 hour or less
117,263 Pool Name Pool Code Percent
10,361,419 Lisburne 640144 45.2%
Niakuk 640148 1.5%
85 North Prudhoe Bay State 640152 0.0%
Pt. Mcintyre 666100 52.3%
222 v·~ West Beach 640186 0.0%
West Niakuk 640149 1.1%
6. Sold
7. Reinjected
9. Flared or vented more than 1 hour (see instr.)
10. Pilot and Purge
10,086
11. Used for lease operations (specify in Remarks)
1,273,946
12. Other (see instructions)
181,767
Authorization> 1 hr:
Safety
¿,'ZZ- MCF
MCF
0'8!2-
13. TOTAL VOLUME (ITEMS 6-12)
11,944,788
Lease Use
15. Purchased gas
o
Waste:
MCF
14. NGL Gas Equivalent
117,263
17. Transferred to: (Express as a negative #) CGF
o
16. Transferred from:
1,104,525
18. Remarks: Block 11: Fuel Gas = 1,128,555 msef and Assist Gas = 145,391 msef; Block 12: Lift Gas Off Field; Block 16: MI Gas from Prudhoe
I hereb.Y certify that.~"'ß"."g." "':7 T:/-] of mY'''''''''''g'·
Signature /J-t~? /V
Printed Name Bernard W. Hajny
Phone (907)564-5028
Date //-/i'cy'
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authoritv 20 AAC25.235.
Title Manager, Production Taxes and Royalty
Form 10-422 Rev. 1/2004
Submit in Duplicate
DATE TIME
10/15/2004 1954-1956
10/15/2004 2024-2031
10/15/2004 2045-2048
10/15/2004 2102-2106
10/15/2004 2125-2126
10/15/2004 2210-2211
1 0/22/2004 0003-0004
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-04
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
1 0/22/2004
1250-1404
Total Flare <= 1 Hour 27
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
4,555
65,449
70,031
4
7
8
6
2
o
o
Instrumentation problem with STV/IP compressor 1800 anti-surge valve
Instrumentation problem with STVIIP compressor 1800 anti-surge valve
Instrumentation problem with STVIIP compressor 1800 anti-surge valve
Instrumentation problem with STVIIP compressor 1800 anti-surge valve
Instrumentation problem with STV/IP compressor 1800 anti-surge valve
Instrumentation problem with STVIIP compressor 1800 anti-surge valve
1830 MI Compressor shutdown due to low seal gas pressure
o
1830 purge for start up of compressor
o
27
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Assist gas increased; attempted to start compressor 1801
Assist gas increased; attempted to start compressor 1801
Assist gas increased; attempted to start compressor 1801
Assist gas increased; attempted to start compressor 1801
Assist gas increased; attempted to start compressor 1801
Assist gas increased; compressor 1800 put back online
1830 depressure completed
Unplanned Started 1830 compressor
DATE
10/15/04
10/15/04
10/15/04
10/15/04
10/15/04
10/15/04
1 0/22/04
1 0/22/04
Volume Flared
TIME
1954-1956
2024-2031
2045-2048
2102-2106
2125-2126
2210-2211
0003-0004
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-04
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
4
8
9
9
4
o
22
Total Flare <= 1 Hour 56
1250-1404
Total Flare> 1 Hour
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
222
222
278
5,272
76,186
81,736
Instrumentation problem with STV/IP compressor 1800 anti-surge valve
Instrumentation problem with STV/IP compressor 1800 anti-surge valve
Instrumentation problem with STVIIP compressor 1800 anti-surge valve
Instrumentation problem with STV/IP compressor 1800 anti-surge valve
Instrumentation problem with STV/IP compressor 1800 anti-surge valve
Instrumentation problem with STVIIP compressor 1800 anti-surge valve
1830 MI Compressor shutdown due to low seal gas pressure
1830 purge for start up of compressor
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Assist gas increased; attempted to start compressor 1801
Assist gas increased; attempted to start compressor 1801
Assist gas increased; attempted to start compressor 1801
Assist gas increased; attempted to start compressor 1801
Assist gas increased; attempted to start compressor 1801
Assist gas increased; compressor 1800 put back online
1830 depressure completed
Unplanned Started 1830 compressor
DATE
10/15/04
10/15/04
10/15/04
10/15/04
10/15/04
10/15/04
1 0122/04
10122/04
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-04
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
1954-1956
2024-2031
2045-2048
2102-2106
2125-2126
2210-2211
0003-0004
Total Flare <= 1 Hour 0
1250-1404
Volume Flared 0
Total Flare> 1 Hour 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
o
o
o
o
o
o
o
Instrumentation problem with STVIIP compressor 1800 anti-surge valve
Instrumentation problem with STV/IP compressor 1800 anti-surge valve
Instrumentation problem with STV/IP compressor 1800 anti-surge valve
Instrumentation problem with STV/IP compressor 1800 anti-surge valve
Instrumentation problem with STVIIP compressor 1800 anti-surge valve
Instrumentation problem with STV/IP compressor 1800 anti-surge valve
1830 MI Compressor shutdown due to low seal gas pressure
o
1830 purge for start up of compressor
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Assist gas increased; attempted to start compressor 1801
Assist gas increased; attempted to start compressor 1801
Assist gas increased; attempted to start compressor 1801
Assist gas increased; attempted to start compressor 1801
Assist gas increased; attempted to start compressor 1801
Assist gas increased; compressor 1800 put back online
1830 depressure completed
Unplanned Started 1830 compressor
DATE
10/15/04
10/15/04
10/15/04
10/15/04
10/15/04
10/15/04
1 0/22/04
10/22/04
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-04
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
1954-1 956
2024-2031
2045-2048
2102-2106
2125-2126
2210-2211
0003-0004
Total Flare <= 1 Hour 0
1250-1404
Volume Flared 0
Total Flare> 1 Hour 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
o
o
o
o
o
o
o
Instrumentation problem with STV/IP compressor 1800 anti-surge valve
Instrumentation problem with STVIIP compressor 1800 anti-surge valve
Instrumentation problem with STV/IP compressor 1800 anti-surge valve
Instrumentation problem with STVIIP compressor 1800 anti-surge valve
Instrumentation problem with STVIIP compressor 1800 anti-surge valve
Instrumentation problem with STV/IP compressor 1800 anti-surge valve
1830 MI Compressor shutdown due to low seal gas pressure
o
1830 purge for start up of compressor
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Assist gas increased; attempted to start compressor 1801
Assist gas increased; attempted to start compressor 1801
Assist gas increased; attempted to start compressor 1801
Assist gas increased; attempted to start compressor 1801
Assist gas increased; attempted to start compressor 1801
Assist gas increased; compressor 1800 put back online
1830 depressure completed
Unplanned Started 1830 compressor
DATE
10/15/04
10/15/04
10/15/04
10/15/04
10/15/04
10/15/04
1 0122/04
1 0/22/04
Volume Flared
TIME
1954-1956
2024-2031
2045-2048
2102-2106
2125-2126
2210-2211
0003-0004
Total Flare <= 1 Hour
1250-1404
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-04
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
Total Flare> 1 Hour 0
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
147
2,131
2,279
o
o
1
o
o
o
o
Instrumentation problem with STV/IP compressor 1800 anti-surge valve
Instrumentation problem with STVIIP compressor 1800 anti-surge valve
Instrumentation problem with STV/IP compressor 1800 anti-surge valve
Instrumentation problem with STV/IP compressor 1800 anti-surge valve
Instrumentation problem with STVIIP compressor 1800 anti-surge valve
Instrumentation problem with STV/IP compressor 1800 anti-surge valve
1830 MI Compressor shutdown due to low seal gas pressure
o
1830 purge for start up of compressor
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Assist gas increased; attempted to start compressor 1801
Assist gas increased; attempted to start compressor 1801
Assist gas increased; attempted to start compressor 1801
Assist gas increased; attempted to start compressor 1801
Assist gas increased; attempted to start compressor 1801
Assist gas increased; compressor 1800 put back online
1830 depressure completed
Started 1830 compressor
DATE
10/15/04
10/15/04
10/15/04
10/15/04
10/15/04
10/15/04
1 0/22/04
10/22/04
Volume Flared
TIME
1954-1 956
2024-2031
2045-2048
2102-2106
2125-2126
2210-2211
0003-0004
Total Flare <= 1 Hour
1250-1404
BP EXPLORATION (ALASKA)
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-04
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
Total Flare> 1 Hour 0
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
112
1,625
1,738
o
o
1
o
o
o
o
Instrumentation problem with STV/IP compressor 1800 anti-surge valve
Instrumentation problem with STVIIP compressor 1800 anti-surge valve
Instrumentation problem with STVIIP compressor 1800 anti-surge valve
Instrumentation problem with STVIIP compressor 1800 anti-surge valve
Instrumentation problem with STV/IP compressor 1800 anti-surge valve
Instrumentation problem with STVIIP compressor 1800 anti-surge valve
1830 MI Compressor shutdown due to low seal gas pressure
o
1830 purge for start up of compressor
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Assist gas increased; attempted to start compressor 1801
Assist gas increased; attempted to start compressor 1801
Assist gas increased; attempted to start compressor 1801
Assist gas increased; attempted to start compressor 1801
Assist gas increased; attempted to start compressor 1801
Assist gas increased; compressor 1800 put back online
1830 depressure completed
Started 1830 compressor
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: LPC DATE: 22 Oct 2004
TIME OF FLARING
SYSTEM Start Stop Duration Intermittent
1. Flare/Relief Valve 00:03 00:04 0 Hrs 1 Mins 0
2. Flare/Relief Valve 12:50 14:04 1 Hrs 14Mins 0
First Determination of Cause:
1. 1830 MI Compressor shutdown due to low Seal Gas pressure
2. 1830 purge for start up of compressor.
Action Taken to Stop Flaring:
1. 1830 depressure completed
2. Started 1830 compressor.
Thursday, November 04, 2004
REPORT NO: 04-0514
Black
Smoke Planned VOLUME
0 0 22 MSCF
0 0 222 MSCF
TOTAL VOLUME 244 MSCF
Page 1 of 1
STATE OF ALASKA
ALASKA Oil AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
12. Facility Name
PBU LISBURNE PROD (GPMA)
Disposition
3. Field
PBU - GPMA
Volume MCF
6. Sold
110,941
7. Reinjected
10,393,739
8, Flared or vented 1 hour or less
856
9. Flared or vented more than 1 hour (see instr.)
o
10. Pilot and Purge
11,867
11. Used for lease operations (specify in Remarks)
1,260,049
12. Other (see instructions)
110,344
13. TOTAL VOLUME (ITEMS 6-12)
11,887,796
14. NGL Gas Equivalent
110,941
15. Purchased gas
o
16. Transferred from: CGF
1,012,083
17. Transferred to: (Express as a negative #)
o
18. Remarks: Block 11: Fuel Gas = 1,085,842 mscf and Assist Gas = 174,207 mscf; Block 12: Lift Gas Off Field; Block 16: MI Gas from Prudhoe
I "'''''' 00"" ""'., ~~ "."'."'~')' '/1",01,,'.', '''' "'" 01 my "'_
p,,,::::: t:z (,.~~
14. Operator 15. MonthlYear of Disposition
BP Novembe~2004
20. For production from multiple pools. list contribution of each pool as a percent of
Total Volume.
Pool Name Pool Code Percent
Lisburne 640144 48.3%
Niakuk 640148 0.8%
North Prudhoe Bay State 640152 0.0%
Pt. Mcintyre 666100 50.4%
West Beach 640186 0.0%
West Niakuk 640149 0.4%
Authorization >1 hr:
MCF
Safety
MCF
Lease Use
MCF
Conservation
Waste:
MCF
Commissioner
Date
Phone (907)564-5028
Title Manager, Production Taxes and Royalty
{;2-/:s~' "../) t.Y
Date ¡rG' . / , (../
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authoritv 20 AAC25.235.
Form 10-422 Rev. 1/2004
Submit in Duplicate
VOLUME
DATE TIME (MSCF)
11/10/2004 1949-1951 1
11/10/2004 2010-2011 0
11/12/2004 0409-0415 0
11/12/2004 1107-1108 0
11/12/2004 1231-1232 0
11/12/2004 1249-1250 0
11/12/2004 1314-1316 0
11/12/2004 1353-1354 0
11/12/2004 1423-1425 0
11/12/2004 1451-1453 0
11/12/2004 1517-1518 0
11/12/2004 1543-1545 0
11/12/2004 1616-1617 0
11/12/2004 2023-2028 0
11/12/2004 2057-2107 0
11/23/2004 0754-0755 0
11/24/2004 1415-1430 0
11/25/2004 0131-0220 0
Total Flare <= 1 Hour
Total Flare> 1 Hour 0
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
5,751
84,399
90,151
PHILLIPS ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-04
DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Turbine 1800 start-up purge
Turbine 1800 start-up purge
Compressor 1830 shutdown due to low suction pressure
Compressor 1830 depressure
Compressor 1830 depressure
Compressor 1830 depressure
Compressor 1830 depressure
Compressor 1830 depressure
Compressor 1830 depressure
Compressor 1830 depressure
Compressor 1830 depressure
Compressor 1830 depressure
Compressor 1830 depressure
Compressor 1830 startup purge
Compressor 1830 startup
Compressor 1830 shut down due to depropanization comp shutdown
Started up 1830 MI compressor to turn shaft for instrument dept
Startup of 1830 MI compressor
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Planned
Planned
Purge completed
Purge completed and turbine started
Assist gas increased & compressor depressured
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Purge completed
Compressor 1830 started
Assist gas increased & compressor depressured
Shutdown 1830 compressor after work complete
Brought compressor online
VOLUME
DATE TIME (MSCF)
11/10104 1949-1951 0
11/10/04 2010-2011 1
11/12/04 0409-0415 46
11/12/04 1107-1108 12
11/12/04 1231-1232 14
11/12/04 1249-1250 14
11/12/04 1314-1316 12
11/12/04 1353·1354 12
11/12/04 1423-1425 11
11/12/04 1451-1453 12
11/12/04 1517-1518 11
11/12/04 1543-1545 11
11/12/04 1616-1617 11
11/12/04 2023-2028 49
11/12/04 2057-2107 199
11/23/04 0754-0755 17
11/24/04 1415-1430 52
11/25/04 0131-0220 371
Total Flare <= 1 Hour 855
0
0
0
0
0
0
0
0
Total Flare> 1 Hour
o
Volume Flared
855
Measured Safety Pilot
Continuous Assist
5,968
87,637
TOTAL FLARED
94,460
PHILLIPS ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-04
DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACT/ON TAKEN TO ELIMINATE CAUSE
Turbine 1800 start-up purge Unplanned
Turbine 1800 start-up purge Unplanned
Compressor 1830 shutdown due to low suction pressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 startup purge Unplanned
Compressor 1830 startup Unplanned
Compressor 1830 shut down due to depropanization comp shutdown Unplanned
Started up 1830 MI compressor to turn shaft for instrument dept Planned
Startup of 1830 MI compressor Planned
Purge completed
Purge completed and turbine started
Assist gas increased & compressor depressured
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Purge completed
Compressor 1830 started
Assist gas increased & compressor depressured
Shutdown 1830 compressor after work complete
Brought compressor online
VOLUME
DATE TIME (MSCF)
11/10/04 1949-1951 0
11/10/04 2010-2011 0
11/12/04 0409-0415 0
11/12/04 1107-1108 0
11/12/04 1231-1232 0
11/12/04 1249-1250 0
11/12/04 1314-1316 0
11/12/04 1353-1354 0
11/12/04 1423-1425 0
11/12/04 1451-1453 0
11/12/04 1517-1518 0
11/12/04 1543-1545 0
11/12/04 1616-1617 0
11/12/04 2023-2028 0
11/12/04 2057-2107 0
11 /23/04 0754-0755 0
11/24/04 1415-1430 0
11/25/04 0131-0220 0
0
0
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
PHILLIPS ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-04
DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Turbine 1800 start-up purge Unplanned
Turbine 1800 start-up purge Unplanned
Compressor 1830 shutdown due to low suction pressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 startup purge Unplanned
Compressor 1830 startup Unplanned
Compressor 1830 shut down due to depropanization comp shute Unplanned
Started up 1830 MI compressor to turn shaft for instrument dept Planned
Startup of 1830 MI compressor Planned
Purge completed
Purge completed and turbine started
Assist gas increased & compressor depressured
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Purge completed
Compressor 1830 started
Assist gas increased & compressor depressured
Shutdown 1830 compressor after work complete
Brought compressor online
VOLUME
DATE TIME (MSCF)
11/10/04 1949-1951 0
11/10/04 2010-2011 0
11/12/04 0409-0415 0
11/12/04 1107-1108 0
11/12/04 1231-1232 0
11/12/04 1249-1250 0
11/12/04 1314-1316 0
11/12/04 1353-1354 0
11/12/04 1423-1425 0
11/12/04 1451-1453 0
11/12/04 1517-1518 0
11/12/04 1543-1545 0
11/12/04 1616-1617 0
11/12/04 2023-2028 0
11/12/04 2057-2107 0
11/23/04 0754-0755 0
11/24/04 1415-1430 0
11/25/04 0131-0220 0
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
PHILLIPS ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-04
DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Turbine 1800 start-up purge Unplanned
Turbine 1800 start-up purge Unplanned
Compressor 1830 shutdown due to low suction pressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 startup purge Unplanned
Compressor 1830 startup Unplanned
Compressor 1830 shut down due to depropanization comp shute Unplanned
Started up 1830 MI compressor to turn shaft for instrument dept Planned
Startup of 1830 MI compressor Planned
Purge completed
Purge completed and turbine started
Assist gas increased & compressor depressured
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Purge completed
Compressor 1830 started
Assist gas increased & compressor depressured
Shutdown 1830 compressor after work complete
Brought compressor online
VOLUME
DATE TIME (Mscf)
11/10/04 1949-1951 0
11/10/04 2010-2011 0
11/12/04 0409-0415 0
11/12/04 1107-1108 0
11/12/04 1231-1232 0
11/12/04 1249-1250 0
11/12/04 1314-1316 0
11/12/04 1353-1354 0
11/12/04 1423-1425 0
11/12/04 1451-1453 0
11/12/04 1517-1518 0
11/12/04 1543-1545 0
11/12/04 1616-1617 0
11/12/04 2023-2028 0
11/12/04 2057-2107 0
11/23/04 0754-0755 0
11/24/04 1415-1430 0
11/25/04 0131-0220 0
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 100
Continuous Assist 1,473
TOTAL FLARED 1,573
BP EXPLORATION, INC.
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-04
DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Turbine 1800 start-up purge Unplanned
Turbine 1800 start-up purge Unplanned
Compressor 1830 shutdown due to low suction pressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 startup purge Unplanned
Compressor 1830 startup Unplanned
Compressor 1830 shut down due to depropanization comp shutdown Unplanned
Started up 1830 MI compressor to turn shaft for instrument dept Planned
Startup of 1830 MI compressor Planned
Purge completed
Purge completed and turbine started
Assist gas increased & compressor depressured
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Purge completed
Compressor 1830 started
Assist gas increased & compressor depressured
Shutdown 1830 compressor after work complete
Brought compressor online
VOLUME
DATE TIME (Mscf)
11/10/04 1949-1951 0
11/10/04 2010-2011 0
11/12/04 0409-0415 0
11/12/04 1107-1108 0
11/12/04 1231-1232 0
11/12/04 1249-1250 0
11/12/04 1314-1316 0
11/12/04 1353-1354 0
11/12/04 1423-1425 0
11/12/04 1451-1453 0
11/12/04 1517-1518 0
11/12/04 1543-1545 0
11/12/04 1616-1617 0
11/12/04 2023-2028 0
11/12/04 2057-2107 0
11 /23/04 0754-0755 0
11/24/04 1415-1430 0
11/25/04 0131-0220 0
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 48
Continuous Assist 698
TOTAL FLARED 746
PHILLIPS ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-04
DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Turbine 1800 start-up purge Unplanned
Turbine 1800 start-up purge Unplanned
Compressor 1830 shutdown due to low suction pressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 depressure Unplanned
Compressor 1830 startup purge Unplanned
Compressor 1830 startup Unplanned
Compressor 1830 shut down due to depropanization comp shutdown Unplanned
Started up 1830 MI compressor to turn shaft for instrument dept Planned
Startup of 1830 MI compressor Planned
Purge completed
Purge completed and turbine started
Assist gas increased & compressor depressured
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Depressure completed
Purge completed
Compressor 1830 started
Assist gas increased & compressor depressured
Shutdown 1830 compressor after work complete
Brought compressor online
FACILITY: LPC
SYSTEM
1. Flare/Relief Valve
REPORT NO: 04-0542
BPXA FLARE REPORT
PRUDHOE SAY
DATE: 24 Nav 2004
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned
14:15 14:30 OHrs 15Mins 0 0 ~
TOTAL VOLUME
First Determination of Cause:
1. Started up 1830 MI Compressor to turn shaft for Instrument dept.
Action Taken to Stop Flaring:
1. Shutdown 1830 Compo after work complete.
Tuesday, November 30, 2004
VOLUME
52 MSCF
52 MSCF
Page 1 of 1
REPORT NO: 04-0543
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: LPC
DATE: 25 Nov 2004
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 01:31 02:20 OHrs 49Mins 0 0 ~ 371 MSCF
TOTAL VOLUME
371 MSCF
First Determination of Cause:
1. Startup of 1830 MI Compressor.
Action Taken to Stop Flaring:
1. Brought online.
Tuesday, November 30,2004
Page 1 of 1
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
12. Facility Name
PBU LISBURNE PROD (GPMA)
Disposition
1. Facility Number
0290000009
3. Field
PBU - GPMA
Volume MCF
6. Sold
132,864
7. Reinjected
10,292,950
8. Flared or vented 1 hour or less
20
9. Flared or vented more than 1 hour (see instr.)
o
10. Pilot and Purge
13,420
11. Used for lease operations (specify in Remarks)
1,178,867
12. Other (see instructions)
81,992
13. TOTAL VOLUME (ITEMS 6-12)
11,700,113
14. NGL Gas Equivalent
132,864
15. Purchased gas
o
16. Transferred from: CGF
802,656
17. Transferred to: (Express as a negative it)
o
18. Remarks: Block 11: Fuel Gas = 1,019,691 msef and Assist Gas = 159,176 msef; Block 12: Lift Gas Off Field; Block 16: MI Gas from Prudhoe
'hereby œ.'~" m']::," ."7;r;;: '".:. '""" my '''"''',dg'.
S'œt~ A "-'fIT')
Printed Name Bernard W. Hajny
14. Operator 15. MonthlYear of Disposition
BP December-2004
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
Pool Name Pool Code Percent
Lisburne 640144 46.9%
Niakuk 640148 1.4%
North Prudhoe Bay State 640152 0.0%
pt. Mcintyre 666100 51.2%
West Beach 640186 0.0%
West Niakuk 640149 0.6%
Authorization> 1 hr:
Safety
MCF
Lease Use
MCF
Conservation
MCF
Waste:
MCF
Commissioner
Date
Phone (907)564-5028
Title Manager, Production Taxes and Royalty
Date /-y ì -tì5'-
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 600 F.
Authoritv 20 AAC25.235.
Form 10-422 Rev. 1/2004
Submit in Duplicate
PHILLIPS ALASKA. INC.
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-04
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
12/30/2001 0553-0554 0 MI Compo 1830 SD due to bad '0' ring on digital valve
Unplanned SD compressor & vented
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 6,288
Continuous Assist 74,527
TOTAL FLARED 80,815
PHILLIPS ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-04
DATE
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
12/30/01
0553-0554
20
MI Compo 1830 SD due to bad '0' ring on digital valve
Unplanned SD compressor & vented
Total Flare <= 1 Hour 20
Total Flare> 1 Hour 0
Volume Flared 20
Measured Safety Pilot 6,869
Continuous Assist 81,572
TOTAL FLARED 88,461
PHILLIPS ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-04
DATE
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
TIME
12/30/01
o
MI Compo 1830 SD due to bad '0' ring on digital valve
0553-0554
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned SD compressor & vented
PHILLIPS ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-04
DATE
TIME
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
12/30/01
0553-0554
o
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
MI Compo 1830 SD due to bad '0' ring on digital valve
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned SD compressor & vented
BP EXPLORATION, INC.
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-04
DATE
TIME
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
12/30/01
0553-0554
o
MI Compo 1830 SD due to bad '0' ring on digital valve
Unplanned SD compressor & vented
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 182
Continuous Assist 2,109
TOTAL FLARED 2,291
PHILLIPS ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-04
DATE
TIME
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
12/30/01
0553-0554
o
MI Compo 1830 SD due to bad '0' ring on digital valve
Unplanned SD compressor & vented
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 81
Continuous Assist 968
TOTAL FLARED 1,049
· '
~
DATE
1/2000
2/2000
3/2000
4/2000
5/2000
6/2000
7/2000
8/2000
9/2000
10/2000
11/2000
12/2000
1/2001
2/2001
3/2001
4/2001
5/2001
6/2001
7/2001
8/2001
9/2001
10/2001
11/2001
12/2001
1/2002
2/2002
3/2002
4/2002
5/2002
6/2002
7/2002
8/2002
PBU GPMA LISBURNE FLARING
PBU GPMA lisburne G,
100,000
90,000
80,000
70,000
~ 60,000
(!)
u. 50,000
o
:::E 40,000
30,000
20,000
10,000
o
~Ç:)Ç:) ~Ç:)Ç:) ~Ç:)Ç:) ~Ç:)Ç:) ~Ç:)~ ~Ç:)~ ~Ç:)~ ~Ç:)~ ~Ç:)rv ~Ç:)rv ~Ç:)rv <
~rç ~rç A.. ~ ~rç ~rç ~rç A.. ~ ~rç ~rç ~rç A.. ~ ~r¡;
~ ~ ~
Mantt
'~J.
- '
9/2002
10/2002
11/2002
12/2002
1/2003
2/2003
3/2003
4/2003
5/2003
6/2003
7/2003
8/2003
9/2003
10/2003
11/2003
12/2003
1/2004
2/2004
3/2004
4/2004
5/2004
6/2004
7/2004
8/2004
9/2004
10/2004
11/2004
12/2004
o
o
30
1272
o
o
5349
5804
GPMA Lisburne Pilo'
50,000
45,000
40,000
35,000
f/) 30,000
ca
C)
u. 25,000
o
:E 20,000
15,000
10,000
5,000
o
~(;:)(;:) ~~~ ~~~ ~(;:)~ ~~~ ~(;:)~ ~(;:)~ ~(;:)~ ~(;:)~ ~~~ ~(;:)~ ~
~~ ~~ '\~ ~~~ ~~ ~~ '\~ ~~~ ~~ ~~ '\~ ~~~
Month
Gary,
Jim Regg has found some abnormally high pilot-purge volumes for 3
months at the GPMA facility and would like to know why. The months
question are:
October 2000 - 41455 mcf
December 2001 - 42195 mcf
January 2003 - 43004 mcf
Thanks,
Steve
,
.J.
1 of 1
10/15/2004 9.z;3.6.AM.
Gas Disposition
Gary,
Jim Regg has found some abnormally high pilot-purge volumes for 3 months at the
GPMA facility and would like to know why. The months question are:
October 2000 - 41455 mcf
December 2001 - 42195 mcf
January 2003 - 43004 mcf
Another problem, PBU 12-23 had injection for Oct & Nov 2003, about 25,000 bbls for
the 2 months. Is this correct as we corrected this well for previous months to
zero_
Thanks Steve
1 of 1
10/28/2004 1 :28 PM
FW: GPMA Pilot Purge spikes in 12-2001,01-2003 and 08-2004
Steve,
Here's the answer I sent to you re9arding the high pilot purge spikes at
GPMA. I'll prepare the revised 10--422 reports as soon as possible.
Gary
From: Benson, Gary A
Sent: Friday, January 14, 2005 1:31 PM
To: Steve McMains (AOGCC) (Steve McMains (AOGCC))
Subject: GPMA pilot Purge spikes in 12-2001, 01-2003 and 08-2004
Steve,
Regarding your questions about abnormally high pilot purge volumes at
the LPC in Oct 2000, Dec 2001, Jan 2003 and Aug 2004 -- we have
finally figured out what happened in the 2001, 2003 and 2004 cases.
It appears that pilot purge spikes on 12/31/2001, 1/31/2003 and
8/6/2004 are a result of bad meter data. In each case, the totalizer
received erroneous pulses resulting in a value of 29,490 mscf. When
the meter totalizer was automatically reset at midnight, the problem
was cleared up.
I will be preparing revised 10-422 gas disposition reports for these
three months with corrected pilot purge volumes. Unfortunately, we do
not have a.ccess to the October 2000 meter data (ARCO was operating
GPMA at that time). We could reasonably assume the October 2000 data
was similarly corrupted and I could prepare an estimate of the pilot
purge volume and revised 10-422 report for Oct 2000, if needed.
Let me know if you have any questions.
I'm still working on getting answers for GC-2 Sept & Oct 2004
questions on pilot purge.
Gary Benson
Volume Accounting
Greater Prudhoe Bay
BP Exploration (Alaska)
(907) 564-4604
(907) 564-4094 fax
bensonga@bp.com