Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutNorthstar / BP3STATE OF ALASKA AOGCC GAS DISPOSITION FILES YEAR: 2007 FACILITY: Northstar OPERATOR: BP EXPLORATION 1. Facility Number 0290000025 2. Facility Name N1 3. Northstar 14. Operator BP 5. MondWesr01 Disposition I Jan -2007 Disposition Volume MCF '/ 20. For production from multiple pods, Mat contribution of each pod as a percent of Total Volume. S. Sold 0 Pool Name Pod Code Percent 7. Reinjected 13,657,325 Northstar 590100 100.0% Northstar 590500 0.0% 9. Flared or vented 1 hour or less 2,983 9. Flared 1 four (nee leatr.) 3,143 or vented more than 10. Pilot aryl Purge 0 11. Used for lease operations (specify in Remarks) 0 12. Other (see instructions) 0 Aualodnaon >t hr Safety �') 3 MCF 13. TOTAL VOLUME (ITEMS 612) 13,663,451 Lease Use MCF 14. NGL Gas Equivalent Conservation MCF 15. Purchased gas ch 2,548,496 waste MCF IS. Transferred from: 3 -Z7 -o7 Dab 17. Transferred to: (Express as a negative 0) 16. Remarks Blocks 6 - 13 include only produced gas from Northstar (.e. no purchased gas) Gas purchased from PBU was used as follows (all in mscf): fuel gas 719,844, pilot purge 27$8, injection 1,825,893. I hereby certify that the foregoing sgnaase --mar is Due • � , to the beat of my knowledge. rue Manager, Production Taxes and Royalties Alaska Note: All volumes must be corrected to pressure of 14.65 psla and to a temperature of 60o F. Authority 20 AAC25.235. dllitost Printed Name Bernard W. Hajny Phone (907)554 -50213 Dab 07 — /,7-(1 7 Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate Northstar Gas Flaring Incident Report 1/1/2007 - 1/31/2007 Start Date / Time Planner! Planned Unplanned Unplanned 01/01/2007 00:09 01/01/2007 00:09 01)01/2007 02:35 End Date / Time Leas Than 1 Hour Greater Than 1 Hour Less Than 1 Hour Greater Than 1 Hour 01 /01/2007 01:53 01/01/2007 05:11 01/01/2007 04:14 Minutes Group Total 1,085 Group Total 0 Group Total 1,918 104.00 650 302.00 1,987 99.00 506 Group Total 3,143 Report Total 6,126 MCF Incident Cause / Description LP Compressor shutdown due to failed ESD LP-Compressor SID due to ESD switch. LP Compressor S/D. Remedlation Taken Event Type Replaced switch and restarted. Equipment Outage Replaced switch and restarted. Equipment Outage Equipment Outage Flare HP1 LP HP1 FlarelncidentDetails Jan 2007 FINAL.xls 2/12/200710:49 AM 1 Facility Number 0290000025 2. Facility Name N1 3. Raid Northstar 4 Operator BP 5 Monttl/year of Disposition Feb -2007 Disposition Volume MCF 20 For production from multiple pools, list contribution of each pool as a percent of Total Volume. s. Sold 0 Pool Name Pool Code Percent 7 Reinjected 7627 148 590100 100.0% •Northstar Northstar 590500 0.0% 8. Flared or vented 1 har bas (does NOT include 331 mad of P911 gas flared) 519 O. Flared or vented more than 1 Hour (see Vie.) 1 332 vit. 10. Plot and Purge 0 11. Used for lease operations (specify in Remarks) 0 12. Other (see Instructions) p ....s e�t'oUMQ$Y -. .. --- a..= ,•.�;p MCF Authorization >1 hr Safety . Z I �� 13. TOTAL VOLUME (ITEMS 6-12) 7,628,999 Lease Use MCF 14. Net_ Gas EOuivalenf Conservation MCF :3( , 15. Purchased gas (ati \n Waste . F ) 15. Transferred from: l,{/ 4 10e a "2 17. Transferred b: (Express as a negative t) 1a. Remarks. Blocks 6 - 13 include only produced gas from Northstar (.e. no purchased gas) Gas purchased from PBU was used as follows (all in mscf): fuel gas 512,873, pilot purge 2492, injection 1,973,944 and flare 33 PBU gas was flared on 2/26 -2/27, during the production shutdown. y ✓ I hereby certify that the for �'r� is true a cor yr the of my knowledge . Signature /�.t Tide Manager. Production Taxes and Royalties Alaska Note: All volumes must be corrected to pressure of 14.85 pale and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Bernard W. Hajny Phone (907)564 -5028 Date ? –1 C-61 / STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Form 10 -422 Rev. 1 /2004 Subunit in Duplicate Northstar Gas Flaring Incident Report 2/1/2007 - 2/28/2007 Start Date / Time End Date / Time Planned Less Than 1 Hour Planned 02/16/2007 22:17 02/16/2007 22:49 02/17/2007 01:57 02/17/2007 03:25 Unplanned Unplanned 02/07/2007 15:33 02/07/2007 21:40 02/08/2007 06:35 <02/08/2007 07:41 02/08/2007 11:41 02/21/2007 02:28 Greater Than 1 Hour 02/18/2007 23:38 02/17/2007 02:00 02/17/2007 05:05 02/17/2007 05:45 Less Than 1 Hour Greater Than 1 Hour 02/07/2007 18:11 02/07/2007 22:53 02/08/2007 07:38 02/08/2007 08:50 02/08/2007 13:58 02/21/2007 04:04 Minutes Group Total 81.00 191.00 188.00 140.00 Group Total Group Total 158.00 73.00 63.00 69.00 137.00 96.00 Group Total Report Total MCF Incident Cause / Description Remedlation Taken 319 (Includes 152 mscf PBU gas) 35 293 1,022 30 Plant shut down. 863 Depressure plant for repairs Depressure plant tor repairs Depressure plant for repairs 531 (Includes 179 mscf PBU gas) 89 Glycol System upset 44 Glycol System upset 32 Glycol System upset 24 Glycol System upset 61 Glycol System upset 61 Depressuring plant for piping replacement/repairs 310 N/A N/A N/A N/A Stablized Glycol System Stablized Glycol System Stablized Glycol System Stablized Glycol System Stablized Glycol System None necessary 2,182 Northstar gas 1851 mscf, Prudhoe gas 331 mscf) Northstar did not produce between 2/17 and 2/28. The field did continue t0 import gas from Prudhoe for fuel and injection during that time. Flare events on 2/26 and 2/27 were the result of restarts of HPA and HPB compressors following logic upgrades and was imported gas from Prudhoe. Event Type Flare Other LP Equipment Safe Out HP1 Equipment Safe Out LP Equipment Sate Out HP1 Upset Upset Upset Upset Upset Equipment Safe Out LP LP LP LP LP HP1 • FlarelncidentDetails Feb 2007 FINAL.xls 3/14/2007 2:26 PM CERTIFIED MAIL # 7006 2150 0004 4420 7912 February 21, 2006 Mr. John Norman, Commissioner Alaska Oil and Gas Conservation Commission 333 W. 7" Avenue, Ste 100 Anchorage, AK 99501 Re: 5-day report. Northstar gas release and facility shutdown Dear Mr. Nornutn: Following our initial notification of the Northstar gas release and associated facility shut -down, BP Exploration (Alaska) Inc. (BPXA) is submitting the 5-day report as required by 20 AAC 25.205(b). On February 15 2007, a pinhole gas seep was discovered on a weld in an 8 -inch discharge cooler pipe of the low pressure gas compression equipment at the Northstar facility. We believe that the volume released was well below the reporting threshold of 1,000 msef. On February 16th, 2007. the facility was shut down to inspect the seep (including its cause) and implement repairs. BPXA is fully inspecting associated piping before returning the facility to service. To date, these inspections have identified additional areas that require repair. These repairs are in progress and restart of the facility is anticipated sometime next week. BPXA will submit a final written report within 30 days as required by 20 AAC 25.205(b). Please do not hesitate to call me or Mr. Bud Fackrell if you or your staff have any questions. Sincerely, et A nne -C tnstine A cu uer bp fl/iRKt. IfJatee v Y 8 Waste management and release reporting coordinator Cc: Bud Fackrell BP EMWaenon OMAN Int P o. B« 1ae312 BOO Ear Bran Booted AMNraaa. Ax e0619S612 USA 1. Facility Number 0290000025 2. Facility Name Nt 3 Flab 4. Operator Northstar I BP IMar 5 MoneWeard deposition - 2007 deposition Volume MCF / 20. For production from multiple pods. list contribution of each pool as a percent of Total Volume. 6. Sell 0 Pod Name Pod Code Percent 7. Reinjected 8,828,510 Northstar 590100 100.0% Northstar 590500 0.0% 8 Flared or vented 1 hour or leas (does NOT Include 161 matt of PBU gas flared) 10,038 m 9. Flared or vented more an 1 h011r (see Instr.) 10,154 10. Plot and Purge 0 11. Used for lease operations (specify In Remarks) 0 ., .. " "�'y"'� Authorization >1 hr. •.: Safety "y b,t 54 MCF 12. Other (see instruction) 0 13. TOTAL VOLUME (ITEMS 6-12) 8,848,702 Lease Use MCF 14 NGL Gas Equivalent Conservation MCF 15. Purchased gas 2,164,344 Waste. MCF 16. Transferred from: ag f -- 4--11: -V 17. Transferred to: (Ewen as a negative 0) 1a Remarks: Blocks 6 - 13 567,879, pilot include only produced gas from Northstar ( purge 2759, injection 1 593 545 and flare .e. no purchased gas) Gas purchased from PBU was used as follows (all in MSCfr. fuel gas 61. PBU gas was flared on 3/4, during the production shutdown. I hereby candy that the f along signature la true correct to the best of my knowledge Tone Manager. Production Taxes and Royalties Alaska / L Date 7 /) 07 Note: All volumes must be corrected to pressure of 14.65 psla and to a temperature of 60o F. Authority 20 AAG255.235. Printed Name Bernard W. Hajny Phone (907)564 -5029 Form 10 -422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate ate— Northstar Gas Flaring Incident Report 3/1/2007 - 3/31/2007 Start Date / Time Planned Planned .034362007 1853 / \ 0306/2007 2051 b3/06/2007 2220 - 03972007 0148 /03072007 08:37 `03/072007 09.04 03072007 15:18 03.072037 16'. Unplanned Unplanned i 013/152037 0847 C \ 03 , 152007 0940 0320/2007 09:12 42037 10:47 03242007 1344 03242007 17:34 03252007 00.27 03252007 02:19 03282 7. 007 049 </\ 03/28/2007 0821 End Date / Time Minutes Lass Than 1 Hour Greater Than 1 Hour 03962007 2523 03062007 22 13 03962007 23.30 03972007 03:15 03072037 16:30 03972007 1516 03972007 16:22 03/072037 1743 Lan Thant Hour Greater Than 1 Hour 03/15/2007 15:58 431.00 03/15/2037 1807 387.00 0320/20071047 95.00 03242037 13:37 170.00 03242007 1727 03242007 22 18 03252007 02'.13 03252007 04:06 03282007 10:09 03282007 10.14 11300 FlarelncdentDetails Mar 2007 FINAL. xis Group Total 270.00 82.00 70.00 8700 473.00 372.00 64.00 80 Group Total 223.00 282.00 108.00 107.00 139.00 Report Total MCF Group Total 8475 Group Total 5911 1724 (Includes 161 mac! PEW gas) 1020 147 182 269 1598 802 103 143 4243 1889 LP Compressor e/d for EAC -2100 leak repair 1199 LP Compressor 8/d for EAC•2100 leak War 532 HP A and LP compressor end. 77 LP tare due b valve misalignment at HPB 4th stage level bridal bbwdown to flare. 123 LP flare due to valve misalignment at HPB 4111 stage beet pedal Obwdown to flare 148 LP flare due to valve misalignment at HPB 4th stage level bridal bbwdovm to tare 54 L° ore due to valve misalignment at HPB 4dh stage level bridal bbwdown to flare. 54 LP flare due to valve misalignment at HP8 401 stage level bridal bbwdown to flare. 276 LP flare maintenance caused a NFC by of me LP flare scrubber non pressure switch. This caused and O5D and cascaded into a LP and HP conpriseabn outage and resulting flare. 1760 LP ears maintenance caused a NFC bV of the LP flare Gaudier high pressure switch. This caused and OSD and cascaded into a LP and HP eanpreaslon outage and resulting ere. 20353 Incident Cause / Description Colo start plant (cowing 3 weak outage Cold start plant following 3 week outage. Coll start plant Meowing 3 week outage. Cold start plant following 3 week outage. Cold start plant bowing 3 week outage. Cold start plant following 3 week outage. Coq start plant following 3 week outage. Coq start plant fobwNg 3 week outage. Northstar did not produce between 3/1 and 3/5. The field did continue to import gas from Prudhoe for fuel and injection during this time. Flaring on 3/4 was related to the commissioning of the replacement LP gas piping and was imported gas from Prudhoe. Remedlatlon Taken Manage web to mitigate start-up flaring. Manage web to mitigate start-up flaring. Manage web to mitigate start-up brllg. Manage web to mitigate start-up flaring. Manage web to mitigate start-up flaring. Manage web to mitigate start-up flaring. Manage wells to mitigate start-up flaring. Manage web to mitigate start flaring. Event Type Flare Plant Startup LP Pled Startup HPI Plant Startup HP1 Plant Startup LP Plant Startup LP Plant Startup HP1 Plant Startup HP1 Plant Startup LP Managed production web to mitigate flaring. Equipment Outage 1P Managed production web b mitigate flaring. Equipment Outage HP1 Cut production and restart Equipment Outage LP Located and dosed valve at 17.15 March 271h. Omer LP Located and dosed valve at 17 15 Mash 27th. Oder LP Located and dosed valve at 17:15 March 27th. Other LP Located and dosed vabe at 1715 Much 27th. Omer LP Located and dosed valve at 17.15 Manic 27th. Omer LP Al web shut in aubmaticaay. Bogart facility. Upset LP Ai wells shut in automattaly. Restart Meaty. Upset HP1 4/10/2007 3:50 PM • Facility Number 0290000025 2 Facility Name N1 3 Field Northstar I 1. 4. Operator 5 Month et on Apr -2007 Disposition Volume MCF 20. For p eduction from multiple poet, tier contribution of each pool as a percent at Total Volume II Sold 0 Pool Name Pool Code Percent 7. Reinjected 13,923,697 Northstar 590100 100.0% Northstar 590500 0.0% 8. Flared or vented 1 hour or less 6,255 9 Flared or vented more than 1 hour (see hlstr.) 12,318 ✓ 10. Pilot and Purge 0 / 1 used for lease operations (specify in Remarks) 0 12. Other (see nsbuetlan) 0 • . ,..^•�• — °'° ^•:• °+� .!e i >. r ..a eyr> Audronzaton >1 hr. Safe fy iZ.,3'S MCF 13. TOTAL VOLUME (ITEMS 8-12) 13,942,270 Lease Use MCF 14. NGL Gas Equivalent Conservation MCF 15. Purchased gas 2.011,969 Waste MCF 18. Transferred from: 6-/.1 P C0� Date 17. Transferred to: (Express as a negative e) 18. Remarks. Blocks 6 - 13 include only produced gas from Northstar ( .e. no purchased gas) Gas purchased from PBl1 was used as follows (all in mscf): fuel gas 677,511, pilot purge 267$ injection 1,331,802. 1 hereby certify that the egang is true a to the e best of my knowledge. �I JJ Tito Manager, Production Taxes and Royalties Alaska Note: All volumes must be corrected t0 pressure of 14.65 pale and to 8 temperat of 60o F. Authority 20 AAC25.235. Signature � �.�/ Printed Ne Bernard W. Hajny Phone (907)564 -5028 Date f -427 / Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate Northstar Gas Flaring Incident Report 4/1/2007 - 4/30/2007 Start Date / Time End Date ! Time Planned Less Than 1 Hour Planned Greater Than 1 Hour 04/03/2007 08:06 04/03/2007 11:04 04/16/2007 16:40 04/16/2007 18:05 04/16/2007 18:49 04117/2007 01:58 Unplanned Unplanned 4 04/022007 00:05 04 /02/2007 00:05 /D4/04 /2007 02:43 `04/04/2007 02:43 04/04/2007 07:28 04/20/2007 21:59 04/22/2007 15:19 < 04/30/2007 11:48 04/33/2007 12:00 Less Than 1 Hour Greater Than 1 Hour 04/02/2007 01:38 04/02/2007 01:39 04/04/2007 03:46 63.00 04/04/2007 03:46 04 /04/2007 08:46 04/21/2007 02:38 04/22/2007 16:46 04/30/2007 13:10 04/30/2007 13:11 Minutes MCF Group Total 1,130 178.00 270 85.00 113 429.00 900 Group Total 1,382 Group Total 5,125 93.00 1,019 94.00 2.137 1,269 6300 463 78.00 111 279.00 3,378 87.00 636 82.00 655 71.00 1,268 Group Total 10,936 Report Total 18,573 Incident Cause 1 Description Remediation Taken Flaring from test separator to bring on NS -13 none necessary following planned remedial work. De- pressure Test Separator for NS -13 Flowback N/A De- pressure Test Separator for NS-13 Flowback N/A HP 8 shut down T - 322 faked which caused the Accoustic to spike HP B shut down 7 -322 failed which caused the Accoustic to spike HP -8 Shut -Down HP Shut•DOwn HP - 8 Shut - Down A facility 050 shut in all of the wells. This cascaded into losing both HP compressors. Flaring from IP separator. HP -B shut down flameout Flaring from HP Separator and Contactor while bringing up HP compression and wells Flaring from HP Separator and Contactor while bringing up HP compression and wells Resorted HP6 Resorted HPB Cut Rates and Restart HP-13 Cut Rates and Restart HP -B Cut Rates and Restart HP - 8 MI weer shut in automatically. Cut wells back to minimize flaring Cut Rates Cut Rates Event Type Commissioning Commissioning Commissioning UWE Upset Equipment Outage Equipment Outage Equipment Outage Equipment Outage Equipment Outage Plant Startup Plant Startup Flare HP1 HP1 HP1 HPt HP2 HP2 HP1 HP1 HP1 HP1 HP1 HP2 FlarelncidentDetails April 2007 FINAL.xls 5/4/2007 12:10 PM 1 Fact lity Number 0290000025 2 Facility Name N1 3. Field Northstar 4. Operator BP 5 Month/year of Deposition May -2007 Disposition Volume MCF 20. For p eduction from multiple pools. list contribution of each pad as a percent of Total Volume. 8 Sold 0 Pod Name Pool Code Percent 7. Reinjected 14,132,423 Northstar 590100 100.0 °a Northstar 590500 0.0So 8. Flared or vented 1 hour or less 2,498 9. Flared or vented more than 1 tw (see Instr.) 4,847 ✓ 10. Pibl and Purge 0 11. Used for lease operations I 1 0 2. Other (See insvuctbrls) IVED 0 114 :, i . . AUthonxanon >1 hr. Safety Ain MCF 13. TOTAL VOLUME (ITEMS 6-12) JUN 2 22007 14,139,768 Lease Use MCF 14 NGL Gas EQUiyalem cos. r..a Cons Commission Conservation MCF 15. Purchased gas 1,934,065 Waste MCF 18. Translened hem: 7- -� �y/ �7 Commission r 1Jate ��/ 17 Transferred 10: (Express as a negative s) 16. Remarks: Blocks 6. 13 include only produced gas from Northstar ( .e. no purchased gas) Gas purchased from PBU was used as follows (all in rnscf): fuel gas 668,982, pilot purge 275, injection 1,262,324. I hereby certify that the for 'rig is true and correct to best of my knowledge. Signature Title Manager, Production and Royamles Alaska Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Bemard W. Hajny Phone (907)584 -5028 Date f -//-Z 7 Form 10 -422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate Northstar Gas Flaring Incident Report 5/1/2007 - 5/31/2007 Start Date / Time Planned Unplanned Unplanned 05/04/2007 14:04 05/04/2007 14:04 05/06/2007 21:31 05/06/2007 21:38 End Date / Time Less Than 1 Hour Less Than 1 Hour Greater Than 1 Hour 05/04/2007 16:53 05/04/2007 16:56 05/07/2007 03:37 05/07/2007 03:47 Minutes Group Total Group Total 169.00 172.00 366.00 369.00 Group Total Report Total MCF Incident Cause / Description Remedlation Taken 1,213 1,285 1,012 937 1,450 1,448 4,847 7,345 LP Compressor shutdown LP Compressor shutdown LP Compresor startup LP Compress startup Replaced failed RTD Replaced failed RTD Event Type Upset Upset LP Purge Gas LP Purge Gas Flare LP HP1 LP HP1 FlarelncidentDetails May 2007 FINAL.xls 6/6/2007 12:58 PM Facility Number 0290000025 I 2. Facility Name N1 3. Field < Operator Northstar IBP r MonuWeard Disposition Jun -2007 Disposition Volume MCF 20. Fa p oduction from multiple pool , list contribution of each pool as a percent of Total Volume. 8' Sob 0 Pod Name Pod Code Percent 7. Reinjected 13,302,577 Northstar 590100 100.0% Northstar 590500 0.0% 8. Flared or vented l how or less 726 ✓ 9. Flared ar vented more Nan 1 tour (see Instr.) 823 - to. Pilot and Purge 0 11. Used for base operations (specify In Remarks) 0 d .- Authorization >1 hr. Tr . � .-- : �= SaSafety Safety b JL3 MCF 12. Other (see instructions) RECEIVED B 13. TOTALVOLUME(ITEMS 6-12) JUL 2 B 2007 13,304,126 Lease Use MCF 14. NGL Gas Equivabnt Conservation MCF L e. 15. Purchased gas Anchorage Abe& 01 84 C3f6 Conwswaa�urs 1,664,777 Waste: MCF 18. Transferred fre m: Cal 7 -� —o7 Co miasi� Data 17. Transferred m: (Express as a negative a) t8. Remarks Blocks 6 - 13 include only produced gas from Northstar ( 625,615, pilot purge 2670, injection 1,036,492. 1 .e. no purchased gas) Gas purchased from PBU was used as follows (all in mscfp fuel gas I hereby cerNy that the foregoing is true correct to the best of my knowledge - Title Manager, Production Taxes and Royalties Alaska Signature / '� Note: All volumes must be corrected to pressure of 1465 pale and to a temperature of 60o F. Authority 20 AAC25.235. �/� •/ �y Printed Name Barnard W. Hajny Phone (907)584.5028 Date �o G' 7 Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate Northstar Gas Flaring Incident Report 6/1/2007 - 6/30/2007 Start Date / Tlme Planned Planned 06/26/2007 20:10 Unplanned Unplanned 06/22/2007 01:26 06/22/2007 11:58 06/22/2007 15:35 End Date / Time Minutes Less Than 1 Hour Greater Than 1 Hour 06/28/2007 21:14 64.00 Leas Than 1 Hour Greater Than 1 Hour 06/22/2007 03:22 Group Total Group Total Group Total 116.00 06/22/2007 13:03 65.00 06/22/2007 17:05 90.00 Group Total Report Total MCF Incident Cause / Description 119 138 Flow line replacement on NS-20. Bled down test None Taken seperalor and Pontine. 138 607 418 Flaring from NGL Accumulator due to a NGL system upset. 141 Raring from NGL Accumulator due to a NGL system upset. 128 Flaring from NGL Accumulator due to a NGL system upset. 685 1,549 Remedladon Taken S/I NS-06, 08, 09, 14 and It Continue Upset troubleshooting cause. S/I NS-06, 08, 09, 14 and 18. Continue Upset troubleshooting cause. S/I N5-06, 08, 09, 14 and 18. Continue Upset troubleshooting cause. Event Type Flare Equipment Safe Out HP1 HP1 HP1 HP1 Flarelncidentt)etails June 2007 FINAL.xls 7/9/2007 10:23 AM 1. Facil Number Faddy 0290000025 12. Fac ty Name N1 3. Field Northstar 4. Operator BP pos• 5. MontNYear of Disposition Jul-2007 Disposition Volume MCF 20. For production from multiple pools. list contribution of each pool a a percent of Total Volume. 8' Sold 0 Pool Name Pool Code Percent 7 Reinjected 13,180,208 Northstar 590100 100.0% Northstar 590500 0.0% 8 Flared or ve td 1 hour or less 2,405 ./ 9. Flared or vented more than 1 hour (see intr.) 2,A84 2+• 10. Pic and Purge 0 11. Used for lease operations (specify Si Remarks) 0 12. Other (see stsaucelore) 0 Authonraton >1 hr. Safety 24433 MCF 13. TOTAL VOLUME (ITEMS 6-12) 13,185,047 Lease Use MCF 14. NGL Gas Equivalent Conservation MCF 15. Purchased gas 1,894,601 Waste: MCF 18. Transkerred troll: �( /�/ /�T�/ /� ��(Z al ' if ' — Date 444. 17. Transferred TransTransferred b: (Express a negative 0) l8. Remarks Blocks 6 - 13 include only produced gas from Northstar (i.e. no purchased gas . Gas purchased from PBU was used as follows (all in Inset): fuel gas 650,059, pilot purge 2759, 1,241,783. 1 hereby certify that the foregoing s true and correct to the best of my knowledge. Signature ) p Tale Manager. Production Taxes and Royalties Alaska Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAr:25 l Printed Name Bernard W. Hajny Phone 1907)564 -5028 Date / ?--d 7 Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate Northstar Gas Flaring Incident Report 7/1/2007 - 7/31/2007 Start Date / Time Planned Planned Unplanned Unplanned 07/14/2007 03:55 07/14/2007 04 07/14/2007 05:49 07/21/2007 02 07/31/2007 04:07 End Date / Time Less Than 1 Hour Greater Than 1 Hour Less Than 1 Hour Greater Than 1 Hour 07/14/2007 05:47 07/14/2007 07:24 07/14/2007 06:53 07/21/2007 04:03 07/31/2007 05:14 Minutes Group Total Group Total Group Total 112.00 162.00 64.00 101.00 67.00 Group Total Report Total MCF Incident Cause / Description 389 0 2016 804 471 216 334 608 2430' 24-33 4839 OSD- due to LAHH in IP separator. OSD- due to LAHH in IP separator. OSD- due to LAHH in IP separator. OSD- due to LAHH in 3rd stage suction HP -A Shut -Down Remediation Taken Shut in wells to mitigate flaring. Shut in wells to mitigate flaring. Shut in wells to mitigate flaring. Shut in wells to mitigate flaring. Cut Rates Event Type Ftere Equipment Outage HP1 Equipment Outage LP Equipment Outage HP1 Upset LP Equipment Outage HP1 FlarelncidentDetails July 2007 FINAL.xls 8/7/2007 2:42 PM • • 1. Facility Number 0290000025 2. Facility Name Ni 3 Field I4 Northstar Disposition Operato I 5. g- 2007 BP Aug -2007 Disposition volume MCF ✓ 20 For p eduction from multiple pools. Iist contribution Meech pool as a percent of Totai Volume 6 Sold 0 P001 Name Pool Code Percent 7 Reitected 13.140,594 Northstar 590100 100.0°0 Northstar 590500 0.0% 8. Flared or vented 1 hour or less 1,800 9 Flared or vented !nom than 1 hour (see fnstr.) 1,878 1o. Piot and Purge 0 11. Used for lease operations (specify Si Remarks) 0 12 Other (see instructions) 0 Official Use a,y Aumonzatlon >1 hr Safe 1 157 `3 MCF 13. TOTAL VOLUME (ITEMS 6 -12) 13.144.272 Lease Use MCF 14 NGL Gas Equivalent Conservation MCF 15. Purchased gas 1.668 Waste' MCF rre 16. Transfed horn: /o_/ a� i ssroner Dose 17. Transferred to. (Express as a negative s) 18. Remarks. Blocks 6 - 13 include only produced gas from Northstar ( .e. no purchased gas) Gas purchased from PBU was used as follows (all in mscf): fuel gas 637,014, pilot purge 2759, injection 1,028,558. 1 hereby certify that the ,. regomg Signature the is m.- to e b of m y knowled Tile Manager. Production Taxes and Royalties Alaska Note: All volumes must be corrected 10 pressure of 14.65 psis and to a temperature of 60o F. Authority 20 AAC25.235. Phone Printed Name Bernard W. Hajny (907)564 -5028 Date y o ) • 07 Form 10-422 Rev, 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate Northstar Gas Flaring Incident Report 8/1/2007 - 8/31/2007 Start Date / Time End Date / Time Planned Less Than 1 Hour Planned Unplanned Unplanned /08/01/2007 08:24 8/111 /2007 09:18 08/28/2007 14:30 \Q8/26200 14:31 Greater Than 1 Hour Less Than 1 Hour Greater Than 1 Hour 08/01/2007 11:05 08/01/2007 11 08/28/2007 18:35 08/28/2007 18:33 Minutes Group Total Group Total Group Total 161.00 11300 12500 122.00 Group Total Report Total MCF 833 0 967 801 400 422 455 1,878 3,678 Incident Cause / Description Purging LP compressor HP - A Shut - Down Plant shutdown Plant shutdown Remediation Taken None necessary Restart HP A Plant restarted Plant restarted Event Type LP Purge Gas Equipment Outage Upset Upset Flare LP HP1 HP1 LP FlarelncidentDetails Aug 2007 FINAL.xls 9/12/2007 8:22 AM 1 Facility Number 0290000025 2. Facility Name NI 3. Field Northstar 4 Operator BP 5 Month/Year of Disposition Sep -2007 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. snkl 0 Pool Name Pool Code Percent 7 Reinjected 11,798.707 Northstar 590100 100.0 Northstar 590500 0.0% 8 Flared or vetted 1 hour or less 4,137 J 9 Flared of vented mone than 1 hour (see Instr.) 15,386 . t0. Psis ana Purge 0 11. Used for lease operations (spemfy in Remarks) 0 12. Other (see instructions) 0 Official Use Only Authorization >I hr. Safety t 5 3S4. t McF 13. TOTAL VOLUME (ITEMS 8-12) 1 1,81 7,630 Lease Use MCF 14. NGL Gas Equivalent Conservation MCF 15 Purchased gas 1, 971.815 Waste MCF 16 Transterrea 1/0111 ' //ten //-/-0 C o ` �s 7 Date / 17. Transferred for (Express as a negative si loner 19. Remarks. Blocks 6. 13 include only produced gas from Northstar (.e. no purchased gas) Gas purchased from PBU was used as follows (all in meet): fuel gas 605,795, pilot purge 2670, injection 1,363,350. I hereby certify that as foregan9 / Signature Is ue and ect to the best of my knowletlge. Title Manager, Production Taxes and Royalties A laska to pressure of 14.65 psia and to a temperatur of 60o F. Authority 20 AAC25.235. Panted Name Bernard W. Halt /� f Phone r907)564-5028 Date e / e) 'C7 Form 10 -422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate Sae a Northstar Gas Flaring Incident Report 9/1/2007 - 9/30/2007 Stan Date / Time End Date / Time Planned Less Than 1 Hour Planned Unplanned Unplanned • 09072007 20:42 209/102007 18:19 09/102007 18:29 09/11/2007 0508 09/112007 05:14 09/18/2007 15.41 "09/182007 16 49 Greater Than 1 Hour Less Than 1 Hour Greater Than 1 Hour 09/07/2007 22:22 09/112007 04:52 09/11/2007 04:51 09/11/2007 09:00 09/11/2007 09:35 09/18/2007 18:32 09/18/2007 1822 Minutes Group Total Group Total Group Total 100.00 633.00 622.00 23200 261.00 171.00 93.00 Group Total Report Total MCF Incident Cause / Description 1,249 0 2,888 1.387 HP -8 shutdown 2,177 Purging LP Compressor for restart. 8.750 Purging LP Compressor for restart. 957 LP compressor failed to restart following an unplanned NFC BESD of the facility. 1.181 HPA remained S/D due to trouble with the LP conpresaar. Flaring from glycol contactor. 748 Purging LP Compressor for restart. 188 Purging LP Compressor for restart. \I 15.386 19,523 Remediatlon Taken HP48 Restart None normal sten sequence. None normal start sequence. Continue to troubiethoot the LP conpnaoi and restart the equipment. Adjusted wells to reduce flaring and ultimately restart the LP compressor. None needed, normal start sequence. Upset None needed, normal start sequence. Upset Event Type Flan Upset HP2 Upset LP Upset HP1 Equipment Outage LP Egteprnent Outage HP1 LP HP1 FlarelncidentDetails Sep 2007 FINAL.xls 1012/2007 2:24 PM 1 Facerty Number 0290000025 2. Facility Name NI 3 Field Northstar 4 Operator BP 5 MonttWear of Deposition Oct -2007 Disposition Volume MCF 20. For p oduction from multiple pools. list contribution of eadl pool as a percent of Total Vol u1110. e. Sold 0 Pool Name Pod Code Percent 7. Reinjected 12,829,826 Northstar 590100 100.0% Northstar 590500 0.0% 9. Flared or vented 1 hour or bas 5,361 9. Flared or vented more than 1 hour (see Instr.) 11,834 ./ 10. Pilot and Purge 0 11 Used for lease operations (specify in Remarks) 0 12 Other (see instntcaans) 0 Official Use Only Authonzatiol >1 tu. Safety f1,8 MCF 13. TOTAL VOLUME (ITEMS 6 - 12) 12,847,021 Lease Use MCF t4. NGL Gas Equivabfa Conservation MCF 15. Purchased gas 1,907,199 Waste MCP 16. Transferred ham: ^7 � /2 — ,',/ 0 m siarner Date 17. Transferred to: (Express as a negative e) is Remarks. Blocks 6 - 13 include only produced gas from Northstar ( 640,042, pilot purge 2759, injection 1,264.398. .e. no purchased gas) Gas purchased from PBU was used as follows (all in disci): fuel gas i tereby certify that the foregoing is true and correct 10 me best of my knowledge. � �, ,,, "' Signature ( Z L,F �- .4 (ALL -, f�`t ' Title Manager, Production Taxes and Royalties Alaska Note: All volumes must be corrected to pressure of 14.65 pale and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Bernard W. Hajny Rhone (907)564 -5028 Date )) / 1/ &.CO 7- 4 Form 10 -422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate SBA Northstar Gas Flaring Incident Report 10/1/2007 - 10/31/2007 Start Date / Time End Date / Time Planned Less Than 1 Hour Planned x/0/18/2007 14:58 ( 10/182007 14:59 10202007 21:19 1020/2007 22:12 10/21/2007 03:03 <10/31/2007 18:54 10/31/2007 21:52 Unplanned Unplanned 10/17/2007 16:48 10/18/2007 08:12 10/18/2007 11:18 10/31)2007 17:48 Greater Than 1 Hour 10/19/2007 01:34 636.00 10/19/2007 01:13 10/212007 02'55 10/21/2007 02:48 10/21/2007 04:06 11/012007 00:22 10/31 /2007 23:59 Less Than 1 Hour Greater Than 1 Hour 10/17/2007 17:57 69.00 10/18/2007 09:31 79.00 10/18/2007 13:26 128.00 10/31/2007 2101 Minutes MCF Group Total 1,507 2,329 614.00 2,203 336.00 803 276.00 454 63 00 121 328.00 529 127.00 407 Group Total 6,846 Group Total 3,854 193.00 3.680 Group Total 4,988 Report Total 17,195 Incident Cause / Description LP purge prior to startup LP purge prior to startup IS startup. purge and venting X2 LP startup, purge and venting X2 LP startup, purge and venting X2 Preparing for an LP Compressor start none Increasing Production for an LP Compressor none 713 HPA went down on a fuel gas valve motor nature. LP went down at same time. Trouble shooting LP 336 HPA went down on a fuel gas valve motor failure. LP went down at same time. Trouble shooting LP HPB Shutdown Remediation Taken Nome None None taken None taken None taken 260 Flaring from LP vessels until the LP Compressor Start and bad the LP Compressor. is started and loaded. Shut 111 all oil we113. Shut in as oil webs. Troubleshoot shutdown Event Type Flare LP Purge Gas IP LP Purge Gas HP1 Plant Startup LP Plant Startup HP1 Plant Startup LP Plant Startup LP Plard Startup HP1 Equipment Outage LP Equipment Outage HP1 Equipment Outage LP Equipment Outage HP1 FlarelncidentDetails Oct 2007 FINAL xls 11/2/2007 10:31 AM 1 Facility Number 0290000025 a Faokty Name Ni 3. Field Northstar 4 Operator BP 5. MondWeer or Dlaposidon Nov - 2007 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. O. Sold 0 Pod Name Pool Code Percent 7. Reinjected 13,763,968 Northstar 590100 100.0% Northstar 590500 0.0% S. Flared or vented 1 hour or leas 3.059 - ' 9. Flared or vented more than 1 hour (see instr.) 2,604 10 Pilot are Rage 0 ✓ 11. useo for lease bperat ors (Splay n Remarks) 0 12. Other (see instructions) 0 A ' ;: P M Usie Raly , ee astrass ` Mks. .. Is Authorization > 1 Safety S 2 k °4- MCF 13. TOTAL VOLUME (ITEMS 6-12) 13,769,631 Lease Use MCF 14 NGL Gas Equivalent Conservatkln MCF 15 Purchased gas 1,896,513 Waste MCF 16. Transferred horn. v 1—,tog Co missaner Data 17 Transferred to (Express as a negative 4) It Remarks. Blocks 6 - 13 include only produced gas from Northstar (.6. no purchased gas) Gas purchased from PBU was used as follows (alt in matt): fuel gas 657,382, pilot purge 2670 injection 1,236,461. I hereby certify that the foregoing is true and core to 1M best of my knowledge. Signature / Title Manager, Production Taxes and Royalties Alaska Note: All volumes must be corrected t0 pressure of 14.65 pale and t0 a temperature of 60o F. Authority 20 AAC25.235. !! Pnmed Name Bernard W. Hajny Phone 1907)564.5020 Date /j -/e C> Form 10 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submt in Duplicate Northstar Gas Flaring Incident Report 11/1/2007 - 11/30/2007 Start Date / Time End Date / Time Minutes MCF Incident Cause / Description Remediatlon Taken Event Type Flare Planned Less Than 1 Hour Group Total 1,894 Planned Greater Than 1 Hour 11/012007 00'13 11/01/2007 01:30 77.00 406 HPB Restart none HPB Purge Gas HP1 Group Total 406 Unplanned Less Than 1 Hour Group Total 1,165 Unplanned Greater Than 1 Hour 11/012007 02:44 11/01/2007 04:04 8000 132 HPB Shutdown none Equipment Outage HP1 11/08/2007 16:53 11/08/2007 18:00 6700 2,066 HPA shut down high level in 4th Stage Restarted HPA Upset HP1 Group Total 2,198 Report Total 5,663 FlarelncidentDetaits Nov 2007 FINAL.xIs 12/6/2007 2:56 PM 1 Facility Number 0290000025 2 Faculty Name N1 3. Field Northstar 4. Operator BP 5. Mont /Year of Disposition Dec - 2007 Disposition Volume MCF 20. For p odhxdion from mulbple pools, list contribution of each pool as a percent of Total Volume. 8. Soltl 0 Pool Name Pool Code Percent 7 Reinjected 14,847,138 Northstar 590100 100.0% Northstar 590500 0.0% 8 Flared or vented 1 hour or less 2,529 9 Flared or vented more than 1 tour (see instr.) 4 322 10. Pilot and Purge 0 11. Used for lease operation (specify in Remarks) 0 Auihonlat.:n >1 hr. � a % MCF ^- -/ 12. Other (See instructions) 0 13. TOTAL VOLUME (ITEMS 8 -12) 14,853,989 Lease Use MCF 14. NOL Gas Equivalent Conservation MCF 15 Purchased gas 1,989,954 Waste MCF 18. Transferred from / D �(�/ 'h.om loner / to 17. Transferred to: (Express as a negative e ) 18. Remarks: Blocks 6 • 13 include only produced gas from Northstar (.e. no purchased gas) Gas purchased from PBU was used as follows (all in msct): fuel gas 701,333, pilot purge 2759, injection 1,285,862. 1 hereby certify that the foregoing is true and correct toe* best of my knowledge. ' /) TItle Manager. Production Taxes and Royalties Alaska Note: All volumes must be corrected to pressure of 14.65 psla and to a temperature of 60o F. Authority 20 AAC25.235. Signature n (((/// P hone e'er Footed Name Bernard W. Ha j y ( 7)554 -5026 Date /— `J" • Form 10 -422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate 1 1 Northstar Gas Flaring Incident Report 12/1/2007 - 12/31/2007 Start Date / Time Planned Planned Unplanned Unplanned 12/01/2007 12:34 12/01 /2007 1326 12/01/2007 15.39 12/072007 23:44 12/07/2007 23:44 12/20/2007 09:48 End Date / Time Less Than 1 Hour Greater Than 1 Hour Less Than 1 HOW Greater Than 1 Hour 12/01/2007 16.11 12/08/2007 01106 12(082007 01:21 12/20/2007 10:49 Minutes MCF Group Total 0 Group Total 0 Group Total 2,529 217.00 2,046 133.00 490 8200 445 97.00 494 61.00 848 Group Total 4,322 Report Tonal 6,851 Incident Cause / Description Upset in the Inlet Scrubber cascaded into a OSD, LP and HPA compressor outage. Flaring from IP Separator and NGL system HPB contEued to canpress HP gas. Upset in the Inlet Scrubber cascaded into a OSD. LP and HPA compressor outage. Flaring from al LP vessels. HPB continued to compress HP gas. LP Compressor shut down due to a false vibration signal. Flaring from LP vessels. LP Compressor shut down due to a false vbration signal. Flaring from IP Separator. Hp 8 went down on acoustic problems Remediatkm Taken AN weir) shut in automatically. Nt wells shut in automatically. Shut in High GOR wells NS-6, 8, 13, 14 8 18 b mitigate flaring. Shut in High GOR wells NS-6, 8, 13, 14 8 18 to mitigate flaring. Restarted HP several times. Event Type Upset Upset Equipment Outage Equipment Outage Equipment Outage Rare HPt LP LP HP1 HP1 FlarelncidentDetails 12 -2007 FINAL.xIs 1/7/2008 11:10 AM