Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutNorthstar / BP3STATE OF ALASKA
AOGCC
GAS DISPOSITION FILES
YEAR: 2007
FACILITY: Northstar
OPERATOR: BP EXPLORATION
1. Facility Number
0290000025
2. Facility Name
N1
3.
Northstar
14. Operator
BP
5. MondWesr01 Disposition
I Jan -2007
Disposition
Volume MCF
'/
20. For production from multiple pods, Mat contribution of each pod as a percent of Total
Volume.
S. Sold
0
Pool Name
Pod Code
Percent
7. Reinjected
13,657,325
Northstar
590100
100.0%
Northstar
590500
0.0%
9. Flared or vented 1 hour or less
2,983
9. Flared
1 four (nee leatr.)
3,143
or vented more than
10. Pilot aryl Purge
0
11. Used for lease operations (specify in Remarks)
0
12. Other (see instructions)
0
Aualodnaon >t hr
Safety
�') 3
MCF
13. TOTAL VOLUME (ITEMS 612)
13,663,451
Lease Use
MCF
14. NGL Gas Equivalent
Conservation
MCF
15. Purchased gas
ch
2,548,496
waste
MCF
IS. Transferred from:
3 -Z7 -o7
Dab
17. Transferred to: (Express as a negative 0)
16. Remarks Blocks 6 - 13 include only produced gas from Northstar (.e. no purchased gas) Gas purchased from PBU was used as follows (all in mscf): fuel gas
719,844, pilot purge 27$8, injection 1,825,893.
I hereby certify that the foregoing
sgnaase --mar
is Due • � , to the beat of my knowledge.
rue Manager, Production Taxes and Royalties Alaska
Note: All volumes must be corrected
to pressure of 14.65 psla and to a
temperature of 60o F. Authority 20
AAC25.235.
dllitost
Printed Name Bernard W. Hajny Phone (907)554 -50213 Dab 07 — /,7-(1 7
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
Northstar Gas Flaring Incident Report
1/1/2007 - 1/31/2007
Start Date / Time
Planner!
Planned
Unplanned
Unplanned
01/01/2007 00:09
01/01/2007 00:09
01)01/2007 02:35
End Date / Time
Leas Than 1 Hour
Greater Than 1 Hour
Less Than 1 Hour
Greater Than 1 Hour
01 /01/2007 01:53
01/01/2007 05:11
01/01/2007 04:14
Minutes
Group Total 1,085
Group Total 0
Group Total 1,918
104.00 650
302.00 1,987
99.00 506
Group Total 3,143
Report Total 6,126
MCF Incident Cause / Description
LP Compressor shutdown due to failed ESD
LP-Compressor SID due to ESD switch.
LP Compressor S/D.
Remedlation Taken
Event Type
Replaced switch and restarted. Equipment Outage
Replaced switch and restarted. Equipment Outage
Equipment Outage
Flare
HP1
LP
HP1
FlarelncidentDetails Jan 2007 FINAL.xls 2/12/200710:49 AM
1 Facility Number
0290000025
2. Facility Name
N1
3. Raid
Northstar
4 Operator
BP
5 Monttl/year of Disposition
Feb -2007
Disposition
Volume MCF
20 For production from multiple pools, list contribution of each pool as a percent of Total
Volume.
s. Sold
0
Pool Name
Pool Code
Percent
7 Reinjected
7627 148
590100
100.0%
•Northstar
Northstar
590500
0.0%
8. Flared or vented 1 har bas (does NOT include 331 mad of P911 gas flared)
519
O. Flared or vented more than 1 Hour (see Vie.)
1 332 vit.
10. Plot and Purge
0
11. Used for lease operations (specify in Remarks)
0
12. Other (see Instructions)
p
....s e�t'oUMQ$Y -. .. --- a..= ,•.�;p
MCF
Authorization >1 hr
Safety
. Z
I ��
13. TOTAL VOLUME (ITEMS 6-12)
7,628,999
Lease Use
MCF
14. Net_ Gas EOuivalenf
Conservation
MCF
:3( ,
15. Purchased gas (ati \n
Waste .
F )
15. Transferred from:
l,{/
4 10e a "2
17. Transferred b: (Express as a negative t)
1a. Remarks. Blocks 6 - 13 include only produced gas from Northstar (.e. no purchased gas) Gas purchased from PBU was used as follows (all in mscf): fuel gas
512,873, pilot purge 2492, injection 1,973,944 and flare 33 PBU gas was flared on 2/26 -2/27, during the production shutdown.
y
✓
I hereby certify that the for �'r� is true a cor yr the of my knowledge .
Signature /�.t Tide Manager. Production Taxes and Royalties Alaska
Note: All volumes must be corrected
to pressure of 14.85 pale and to a
temperature of 60o F. Authority 20
AAC25.235.
Printed Name Bernard W. Hajny Phone (907)564 -5028 Date ? –1 C-61 /
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Form 10 -422 Rev. 1 /2004
Subunit in Duplicate
Northstar Gas Flaring Incident Report
2/1/2007 - 2/28/2007
Start Date / Time End Date / Time
Planned Less Than 1 Hour
Planned
02/16/2007 22:17
02/16/2007 22:49
02/17/2007 01:57
02/17/2007 03:25
Unplanned
Unplanned
02/07/2007 15:33
02/07/2007 21:40
02/08/2007 06:35
<02/08/2007 07:41
02/08/2007 11:41
02/21/2007 02:28
Greater Than 1 Hour
02/18/2007 23:38
02/17/2007 02:00
02/17/2007 05:05
02/17/2007 05:45
Less Than 1 Hour
Greater Than 1 Hour
02/07/2007 18:11
02/07/2007 22:53
02/08/2007 07:38
02/08/2007 08:50
02/08/2007 13:58
02/21/2007 04:04
Minutes
Group Total
81.00
191.00
188.00
140.00
Group Total
Group Total
158.00
73.00
63.00
69.00
137.00
96.00
Group Total
Report Total
MCF Incident Cause / Description Remedlation Taken
319 (Includes 152 mscf PBU gas)
35
293
1,022
30 Plant shut down.
863 Depressure plant for repairs
Depressure plant tor repairs
Depressure plant for repairs
531 (Includes 179 mscf PBU gas)
89 Glycol System upset
44 Glycol System upset
32 Glycol System upset
24 Glycol System upset
61 Glycol System upset
61 Depressuring plant for piping
replacement/repairs
310
N/A
N/A
N/A
N/A
Stablized Glycol System
Stablized Glycol System
Stablized Glycol System
Stablized Glycol System
Stablized Glycol System
None necessary
2,182 Northstar gas 1851 mscf, Prudhoe gas 331 mscf)
Northstar did not produce between 2/17 and 2/28. The field did continue t0 import
gas from Prudhoe for fuel and injection during that time. Flare events on 2/26 and
2/27 were the result of restarts of HPA and HPB compressors following logic
upgrades and was imported gas from Prudhoe.
Event Type
Flare
Other LP
Equipment Safe Out HP1
Equipment Safe Out LP
Equipment Sate Out HP1
Upset
Upset
Upset
Upset
Upset
Equipment Safe Out
LP
LP
LP
LP
LP
HP1
•
FlarelncidentDetails Feb 2007 FINAL.xls 3/14/2007 2:26 PM
CERTIFIED MAIL # 7006 2150 0004 4420 7912
February 21, 2006
Mr. John Norman, Commissioner
Alaska Oil and Gas Conservation Commission
333 W. 7" Avenue, Ste 100
Anchorage, AK 99501
Re: 5-day report. Northstar gas release and facility shutdown
Dear Mr. Nornutn:
Following our initial notification of the Northstar gas release and associated facility shut -down, BP
Exploration (Alaska) Inc. (BPXA) is submitting the 5-day report as required by 20 AAC 25.205(b).
On February 15 2007, a pinhole gas seep was discovered on a weld in an 8 -inch discharge cooler pipe of the
low pressure gas compression equipment at the Northstar facility. We believe that the volume released was
well below the reporting threshold of 1,000 msef. On February 16th, 2007. the facility was shut down to
inspect the seep (including its cause) and implement repairs. BPXA is fully inspecting associated piping
before returning the facility to service. To date, these inspections have identified additional areas that require
repair. These repairs are in progress and restart of the facility is anticipated sometime next week.
BPXA will submit a final written report within 30 days as required by 20 AAC 25.205(b). Please do not
hesitate to call me or Mr. Bud Fackrell if you or your staff have any questions.
Sincerely,
et A nne -C tnstine A cu uer
bp
fl/iRKt. IfJatee v
Y 8
Waste management and release reporting coordinator
Cc:
Bud Fackrell
BP EMWaenon OMAN Int
P o. B« 1ae312
BOO Ear Bran Booted
AMNraaa. Ax e0619S612
USA
1. Facility Number
0290000025
2. Facility Name
Nt
3 Flab 4. Operator
Northstar I BP IMar
5 MoneWeard deposition
- 2007
deposition
Volume MCF
/
20. For production from multiple pods. list contribution of each pool as a percent of Total
Volume.
6. Sell
0
Pod Name
Pod Code
Percent
7. Reinjected
8,828,510
Northstar
590100
100.0%
Northstar
590500
0.0%
8 Flared or vented 1 hour or leas (does NOT Include 161 matt of PBU gas flared)
10,038
m
9. Flared or vented more an 1 h011r (see Instr.)
10,154
10. Plot and Purge
0
11. Used for lease operations (specify In Remarks)
0
., .. " "�'y"'�
Authorization >1 hr.
•.:
Safety
"y
b,t 54
MCF
12. Other (see instruction)
0
13. TOTAL VOLUME (ITEMS 6-12)
8,848,702
Lease Use
MCF
14 NGL Gas Equivalent
Conservation
MCF
15. Purchased gas
2,164,344
Waste.
MCF
16. Transferred from:
ag f -- 4--11: -V
17. Transferred to: (Ewen as a negative 0)
1a Remarks: Blocks 6 - 13
567,879, pilot
include only produced gas from Northstar (
purge 2759, injection 1 593 545 and flare
.e. no purchased gas) Gas purchased from PBU was used as follows (all in MSCfr. fuel gas
61. PBU gas was flared on 3/4, during the production shutdown.
I hereby candy that the f along
signature
la true correct to the best of my knowledge
Tone Manager. Production
Taxes and Royalties Alaska
/ L
Date 7 /) 07
Note: All volumes must be corrected
to pressure of 14.65 psla and to a
temperature of 60o F. Authority 20
AAG255.235.
Printed Name Bernard W. Hajny Phone (907)564 -5029
Form 10 -422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
ate—
Northstar Gas Flaring Incident Report
3/1/2007 - 3/31/2007
Start Date / Time
Planned
Planned
.034362007 1853
/
\ 0306/2007 2051
b3/06/2007 2220
- 03972007 0148
/03072007 08:37
`03/072007 09.04
03072007 15:18
03.072037 16'.
Unplanned
Unplanned
i 013/152037 0847
C \ 03 , 152007 0940
0320/2007 09:12
42037 10:47
03242007 1344
03242007 17:34
03252007 00.27
03252007 02:19
03282 7. 007 049
</\
03/28/2007 0821
End Date / Time Minutes
Lass Than 1 Hour
Greater Than 1 Hour
03962007 2523
03062007 22 13
03962007 23.30
03972007 03:15
03072037 16:30
03972007 1516
03972007 16:22
03/072037 1743
Lan Thant Hour
Greater Than 1 Hour
03/15/2007 15:58 431.00
03/15/2037 1807 387.00
0320/20071047 95.00
03242037 13:37 170.00
03242007 1727
03242007 22 18
03252007 02'.13
03252007 04:06
03282007 10:09
03282007 10.14 11300
FlarelncdentDetails Mar 2007 FINAL. xis
Group Total
270.00
82.00
70.00
8700
473.00
372.00
64.00
80
Group Total
223.00
282.00
108.00
107.00
139.00
Report Total
MCF
Group Total 8475
Group Total 5911
1724 (Includes 161 mac! PEW gas)
1020
147
182
269
1598
802
103
143
4243
1889 LP Compressor e/d for EAC -2100 leak repair
1199 LP Compressor 8/d for EAC•2100 leak War
532 HP A and LP compressor end.
77 LP tare due b valve misalignment at HPB 4th stage
level bridal bbwdown to flare.
123 LP flare due to valve misalignment at HPB 4111 stage
beet pedal Obwdown to flare
148 LP flare due to valve misalignment at HPB 4th stage
level bridal bbwdovm to tare
54 L° ore due to valve misalignment at HPB 4dh stage
level bridal bbwdown to flare.
54 LP flare due to valve misalignment at HP8 401 stage
level bridal bbwdown to flare.
276 LP flare maintenance caused a NFC by of me LP
flare scrubber non pressure switch. This caused and
O5D and cascaded into a LP and HP conpriseabn
outage and resulting flare.
1760 LP ears maintenance caused a NFC bV of the LP
flare Gaudier high pressure switch. This caused and
OSD and cascaded into a LP and HP eanpreaslon
outage and resulting ere.
20353
Incident Cause / Description
Colo start plant (cowing 3 weak outage
Cold start plant following 3 week outage.
Coll start plant Meowing 3 week outage.
Cold start plant following 3 week outage.
Cold start plant bowing 3 week outage.
Cold start plant following 3 week outage.
Coq start plant following 3 week outage.
Coq start plant fobwNg 3 week outage.
Northstar did not produce between 3/1 and 3/5. The field did continue to
import gas from Prudhoe for fuel and injection during this time. Flaring
on 3/4 was related to the commissioning of the replacement LP gas
piping and was imported gas from Prudhoe.
Remedlatlon Taken
Manage web to mitigate start-up flaring.
Manage web to mitigate start-up flaring.
Manage web to mitigate start-up brllg.
Manage web to mitigate start-up flaring.
Manage web to mitigate start-up flaring.
Manage web to mitigate start-up flaring.
Manage wells to mitigate start-up flaring.
Manage web to mitigate start flaring.
Event Type
Flare
Plant Startup LP
Pled Startup HPI
Plant Startup HP1
Plant Startup LP
Plant Startup LP
Plant Startup HP1
Plant Startup HP1
Plant Startup LP
Managed production web to mitigate flaring. Equipment Outage 1P
Managed production web b mitigate flaring. Equipment Outage HP1
Cut production and restart Equipment Outage LP
Located and dosed valve at 17.15 March 271h. Omer LP
Located and dosed valve at 17 15 Mash 27th. Oder LP
Located and dosed valve at 17:15 March 27th. Other LP
Located and dosed vabe at 1715 Much 27th. Omer LP
Located and dosed valve at 17.15 Manic 27th. Omer LP
Al web shut in aubmaticaay. Bogart facility. Upset LP
Ai wells shut in automattaly. Restart Meaty. Upset HP1
4/10/2007 3:50 PM
•
Facility Number
0290000025
2 Facility Name
N1
3 Field
Northstar I 1.
4. Operator
5 Month et on Apr -2007
Disposition
Volume MCF
20. For p eduction from multiple poet, tier contribution of each pool as a percent at Total
Volume
II Sold
0
Pool Name
Pool Code
Percent
7. Reinjected
13,923,697
Northstar
590100
100.0%
Northstar
590500
0.0%
8. Flared or vented 1 hour or less
6,255
9 Flared or vented more than 1 hour (see hlstr.)
12,318 ✓
10. Pilot and Purge
0
/
1 used for lease operations (specify in Remarks)
0
12. Other (see nsbuetlan)
0
• . ,..^•�• — °'° ^•:• °+� .!e i >. r ..a eyr>
Audronzaton >1 hr.
Safe fy
iZ.,3'S
MCF
13. TOTAL VOLUME (ITEMS 8-12)
13,942,270
Lease Use
MCF
14. NGL Gas Equivalent
Conservation
MCF
15. Purchased gas
2.011,969
Waste
MCF
18. Transferred from:
6-/.1
P C0� Date
17. Transferred to: (Express as a negative e)
18. Remarks. Blocks 6 - 13 include only produced gas from Northstar ( .e. no purchased gas) Gas purchased from PBl1 was used as follows (all in mscf): fuel gas
677,511, pilot purge 267$ injection 1,331,802.
1 hereby certify that the egang is true a to the e best of my knowledge.
�I JJ
Tito Manager, Production Taxes and Royalties Alaska
Note: All volumes must be corrected
t0 pressure of 14.65 pale and to 8
temperat of 60o F. Authority 20
AAC25.235.
Signature � �.�/
Printed Ne Bernard
W. Hajny Phone (907)564 -5028 Date f -427 /
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
Northstar Gas Flaring Incident Report
4/1/2007 - 4/30/2007
Start Date / Time End Date ! Time
Planned Less Than 1 Hour
Planned Greater Than 1 Hour
04/03/2007 08:06 04/03/2007 11:04
04/16/2007 16:40 04/16/2007 18:05
04/16/2007 18:49 04117/2007 01:58
Unplanned
Unplanned
4 04/022007 00:05
04 /02/2007 00:05
/D4/04 /2007 02:43
`04/04/2007 02:43
04/04/2007 07:28
04/20/2007 21:59
04/22/2007 15:19
< 04/30/2007 11:48
04/33/2007 12:00
Less Than 1 Hour
Greater Than 1 Hour
04/02/2007 01:38
04/02/2007 01:39
04/04/2007 03:46 63.00
04/04/2007 03:46
04 /04/2007 08:46
04/21/2007 02:38
04/22/2007 16:46
04/30/2007 13:10
04/30/2007 13:11
Minutes MCF
Group Total 1,130
178.00 270
85.00 113
429.00 900
Group Total 1,382
Group Total 5,125
93.00 1,019
94.00 2.137
1,269
6300 463
78.00 111
279.00 3,378
87.00 636
82.00 655
71.00 1,268
Group Total 10,936
Report Total 18,573
Incident Cause 1 Description Remediation Taken
Flaring from test separator to bring on NS -13 none necessary
following planned remedial work.
De- pressure Test Separator for NS -13 Flowback N/A
De- pressure Test Separator for NS-13 Flowback N/A
HP 8 shut down T - 322 faked which caused the
Accoustic to spike
HP B shut down 7 -322 failed which caused the
Accoustic to spike
HP -8 Shut -Down
HP Shut•DOwn
HP - 8 Shut - Down
A facility 050 shut in all of the wells. This
cascaded into losing both HP compressors.
Flaring from IP separator.
HP -B shut down flameout
Flaring from HP Separator and Contactor while
bringing up HP compression and wells
Flaring from HP Separator and Contactor while
bringing up HP compression and wells
Resorted HP6
Resorted HPB
Cut Rates and Restart HP-13
Cut Rates and Restart HP -B
Cut Rates and Restart HP - 8
MI weer shut in automatically.
Cut wells back to minimize flaring
Cut Rates
Cut Rates
Event Type
Commissioning
Commissioning
Commissioning
UWE
Upset
Equipment Outage
Equipment Outage
Equipment Outage
Equipment Outage
Equipment Outage
Plant Startup
Plant Startup
Flare
HP1
HP1
HP1
HPt
HP2
HP2
HP1
HP1
HP1
HP1
HP1
HP2
FlarelncidentDetails April 2007 FINAL.xls 5/4/2007 12:10 PM
1 Fact lity Number
0290000025
2 Facility Name
N1
3. Field
Northstar
4. Operator
BP
5 Month/year of Deposition
May -2007
Disposition
Volume MCF
20. For p eduction from multiple pools. list contribution of each pad as a percent of Total
Volume.
8 Sold
0
Pod Name
Pool Code
Percent
7. Reinjected
14,132,423
Northstar
590100
100.0 °a
Northstar
590500
0.0So
8. Flared or vented 1 hour or less
2,498
9. Flared or vented more than 1 tw (see Instr.)
4,847 ✓
10. Pibl and Purge
0
11. Used for lease operations I
1
0
2. Other (See insvuctbrls)
IVED
0
114
:,
i . .
AUthonxanon >1 hr.
Safety
Ain
MCF
13. TOTAL VOLUME (ITEMS 6-12) JUN 2 22007
14,139,768
Lease Use
MCF
14 NGL Gas EQUiyalem cos. r..a Cons Commission
Conservation
MCF
15. Purchased gas
1,934,065
Waste
MCF
18. Translened hem:
7- -� �y/ �7
Commission r 1Jate ��/
17 Transferred 10: (Express as a negative s)
16. Remarks: Blocks 6. 13 include only produced gas from Northstar ( .e. no purchased gas) Gas purchased from PBU was used as follows (all in rnscf): fuel gas
668,982, pilot purge 275, injection 1,262,324.
I hereby certify that the for 'rig is true and correct to best of my knowledge.
Signature Title Manager, Production and Royamles Alaska
Note: All volumes must be corrected
to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
AAC25.235.
Printed Name Bemard
W. Hajny Phone (907)584 -5028 Date f -//-Z 7
Form 10 -422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
Northstar Gas Flaring Incident Report
5/1/2007 - 5/31/2007
Start Date / Time
Planned
Unplanned
Unplanned
05/04/2007 14:04
05/04/2007 14:04
05/06/2007 21:31
05/06/2007 21:38
End Date / Time
Less Than 1 Hour
Less Than 1 Hour
Greater Than 1 Hour
05/04/2007 16:53
05/04/2007 16:56
05/07/2007 03:37
05/07/2007 03:47
Minutes
Group Total
Group Total
169.00
172.00
366.00
369.00
Group Total
Report Total
MCF Incident Cause / Description Remedlation Taken
1,213
1,285
1,012
937
1,450
1,448
4,847
7,345
LP Compressor shutdown
LP Compressor shutdown
LP Compresor startup
LP Compress startup
Replaced failed RTD
Replaced failed RTD
Event Type
Upset
Upset
LP Purge Gas
LP Purge Gas
Flare
LP
HP1
LP
HP1
FlarelncidentDetails May 2007 FINAL.xls 6/6/2007 12:58 PM
Facility Number
0290000025
I 2. Facility Name
N1
3. Field < Operator
Northstar IBP
r MonuWeard Disposition
Jun -2007
Disposition
Volume MCF
20. Fa p oduction from multiple pool , list contribution of each pool as a percent of Total
Volume.
8' Sob
0
Pod Name
Pod Code
Percent
7. Reinjected
13,302,577
Northstar
590100
100.0%
Northstar
590500
0.0%
8. Flared or vented l how or less
726 ✓
9. Flared ar vented more Nan 1 tour (see Instr.)
823 -
to. Pilot and Purge
0
11. Used for base operations (specify In Remarks)
0
d .-
Authorization >1 hr.
Tr
. � .-- : �=
SaSafety Safety
b
JL3
MCF
12. Other (see instructions) RECEIVED
B
13. TOTALVOLUME(ITEMS 6-12)
JUL 2 B 2007
13,304,126
Lease Use
MCF
14. NGL Gas Equivabnt
Conservation
MCF
L e.
15. Purchased gas Anchorage Abe& 01 84 C3f6 Conwswaa�urs
1,664,777
Waste:
MCF
18. Transferred fre m:
Cal 7 -� —o7
Co miasi� Data
17. Transferred m: (Express as a negative a)
t8. Remarks Blocks 6 - 13 include only produced gas from Northstar (
625,615, pilot purge 2670, injection 1,036,492.
1
.e. no purchased gas) Gas purchased from PBU was used as follows (all in mscfp fuel gas
I hereby cerNy that the foregoing is true correct to the best of my knowledge
- Title Manager, Production Taxes and Royalties Alaska
Signature / '�
Note: All volumes must be corrected
to pressure of 1465 pale and to a
temperature of 60o F. Authority 20
AAC25.235.
�/� •/
�y
Printed Name Barnard W. Hajny Phone (907)584.5028 Date �o G' 7
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
Northstar Gas Flaring Incident Report
6/1/2007 - 6/30/2007
Start Date / Tlme
Planned
Planned
06/26/2007 20:10
Unplanned
Unplanned
06/22/2007 01:26
06/22/2007 11:58
06/22/2007 15:35
End Date / Time Minutes
Less Than 1 Hour
Greater Than 1 Hour
06/28/2007 21:14 64.00
Leas Than 1 Hour
Greater Than 1 Hour
06/22/2007 03:22
Group Total
Group Total
Group Total
116.00
06/22/2007 13:03 65.00
06/22/2007 17:05 90.00
Group Total
Report Total
MCF Incident Cause / Description
119
138 Flow line replacement on NS-20. Bled down test None Taken
seperalor and Pontine.
138
607
418 Flaring from NGL Accumulator due to a NGL
system upset.
141 Raring from NGL Accumulator due to a NGL
system upset.
128 Flaring from NGL Accumulator due to a NGL
system upset.
685
1,549
Remedladon Taken
S/I NS-06, 08, 09, 14 and It Continue Upset
troubleshooting cause.
S/I NS-06, 08, 09, 14 and 18. Continue Upset
troubleshooting cause.
S/I N5-06, 08, 09, 14 and 18. Continue Upset
troubleshooting cause.
Event Type
Flare
Equipment Safe Out HP1
HP1
HP1
HP1
Flarelncidentt)etails June 2007 FINAL.xls 7/9/2007 10:23 AM
1. Facil Number
Faddy
0290000025
12. Fac ty Name
N1
3. Field
Northstar
4. Operator
BP
pos•
5. MontNYear of Disposition
Jul-2007
Disposition
Volume MCF
20. For production from multiple pools. list contribution of each pool a a percent of
Total Volume.
8' Sold
0
Pool Name
Pool Code
Percent
7 Reinjected
13,180,208
Northstar
590100
100.0%
Northstar
590500
0.0%
8 Flared or ve td 1 hour or less
2,405 ./
9. Flared or vented more than 1 hour (see intr.)
2,A84 2+•
10. Pic and Purge
0
11. Used for lease operations (specify Si Remarks)
0
12. Other (see stsaucelore)
0
Authonraton >1 hr.
Safety
24433
MCF
13. TOTAL VOLUME (ITEMS 6-12)
13,185,047
Lease Use
MCF
14. NGL Gas Equivalent
Conservation
MCF
15. Purchased gas
1,894,601
Waste:
MCF
18. Transkerred troll:
�( /�/ /�T�/ /�
��(Z
al ' if ' — Date 444.
17. Transferred
TransTransferred b: (Express a negative 0)
l8. Remarks Blocks 6 - 13 include only produced gas from Northstar (i.e. no purchased gas . Gas purchased from PBU was used as follows (all in Inset): fuel gas
650,059, pilot purge 2759, 1,241,783.
1 hereby certify that the foregoing s true and correct to the best of my knowledge.
Signature ) p Tale Manager. Production Taxes and Royalties Alaska
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAr:25
l
Printed Name Bernard W. Hajny Phone 1907)564 -5028 Date / ?--d 7
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
Northstar Gas Flaring Incident Report
7/1/2007 - 7/31/2007
Start Date / Time
Planned
Planned
Unplanned
Unplanned
07/14/2007 03:55
07/14/2007 04
07/14/2007 05:49
07/21/2007 02
07/31/2007 04:07
End Date / Time
Less Than 1 Hour
Greater Than 1 Hour
Less Than 1 Hour
Greater Than 1 Hour
07/14/2007 05:47
07/14/2007 07:24
07/14/2007 06:53
07/21/2007 04:03
07/31/2007 05:14
Minutes
Group Total
Group Total
Group Total
112.00
162.00
64.00
101.00
67.00
Group Total
Report Total
MCF Incident Cause / Description
389
0
2016
804
471
216
334
608
2430'
24-33
4839
OSD- due to LAHH in IP separator.
OSD- due to LAHH in IP separator.
OSD- due to LAHH in IP separator.
OSD- due to LAHH in 3rd stage suction
HP -A Shut -Down
Remediation Taken
Shut in wells to mitigate flaring.
Shut in wells to mitigate flaring.
Shut in wells to mitigate flaring.
Shut in wells to mitigate flaring.
Cut Rates
Event Type
Ftere
Equipment Outage HP1
Equipment Outage LP
Equipment Outage HP1
Upset LP
Equipment Outage HP1
FlarelncidentDetails July 2007 FINAL.xls 8/7/2007 2:42 PM
•
•
1. Facility Number
0290000025
2. Facility Name
Ni
3 Field I4
Northstar
Disposition
Operato I 5. g- 2007
BP Aug -2007
Disposition
volume MCF
✓
20 For p eduction from multiple pools. Iist contribution Meech pool as a percent of Totai
Volume
6 Sold
0
P001 Name
Pool Code
Percent
7 Reitected
13.140,594
Northstar
590100
100.0°0
Northstar
590500
0.0%
8. Flared or vented 1 hour or less
1,800
9 Flared or vented !nom than 1 hour (see fnstr.)
1,878
1o. Piot and Purge
0
11. Used for lease operations (specify Si Remarks)
0
12 Other (see instructions)
0
Official Use a,y
Aumonzatlon >1 hr
Safe
1 157 `3
MCF
13. TOTAL VOLUME (ITEMS 6 -12)
13.144.272
Lease Use
MCF
14 NGL Gas Equivalent
Conservation
MCF
15. Purchased gas
1.668
Waste'
MCF
rre
16. Transfed horn:
/o_/ a�
i ssroner Dose
17. Transferred to. (Express as a negative s)
18. Remarks. Blocks 6 - 13 include only produced gas from Northstar ( .e. no purchased gas) Gas purchased from PBU was used as follows (all in mscf): fuel gas
637,014, pilot purge 2759, injection 1,028,558.
1 hereby certify that the ,. regomg
Signature
the
is m.- to e b of m y knowled
Tile Manager. Production Taxes and Royalties Alaska
Note: All volumes must be corrected
10 pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
AAC25.235.
Phone Printed Name Bernard W. Hajny (907)564 -5028 Date y o ) • 07
Form 10-422 Rev, 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
Northstar Gas Flaring Incident Report
8/1/2007 - 8/31/2007
Start Date / Time End Date / Time
Planned Less Than 1 Hour
Planned
Unplanned
Unplanned
/08/01/2007 08:24
8/111 /2007 09:18
08/28/2007 14:30
\Q8/26200 14:31
Greater Than 1 Hour
Less Than 1 Hour
Greater Than 1 Hour
08/01/2007 11:05
08/01/2007 11
08/28/2007 18:35
08/28/2007 18:33
Minutes
Group Total
Group Total
Group Total
161.00
11300
12500
122.00
Group Total
Report Total
MCF
833
0
967
801
400
422
455
1,878
3,678
Incident Cause / Description
Purging LP compressor
HP - A Shut - Down
Plant shutdown
Plant shutdown
Remediation Taken
None necessary
Restart HP A
Plant restarted
Plant restarted
Event Type
LP Purge Gas
Equipment Outage
Upset
Upset
Flare
LP
HP1
HP1
LP
FlarelncidentDetails Aug 2007 FINAL.xls 9/12/2007 8:22 AM
1 Facility Number
0290000025
2. Facility Name
NI
3. Field
Northstar
4 Operator
BP
5 Month/Year of Disposition
Sep -2007
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of Total
Volume.
6. snkl
0
Pool Name
Pool Code
Percent
7 Reinjected
11,798.707
Northstar
590100
100.0
Northstar
590500
0.0%
8 Flared or vetted 1 hour or less
4,137 J
9 Flared of vented mone than 1 hour (see Instr.)
15,386 .
t0. Psis ana Purge
0
11. Used for lease operations (spemfy in Remarks)
0
12. Other (see instructions)
0
Official Use Only
Authorization >I hr.
Safety
t 5 3S4.
t
McF
13. TOTAL VOLUME (ITEMS 8-12)
1 1,81 7,630
Lease Use
MCF
14. NGL Gas Equivalent
Conservation
MCF
15 Purchased gas
1, 971.815
Waste
MCF
16 Transterrea 1/0111 '
//ten //-/-0
C o ` �s
7
Date /
17. Transferred for (Express as a negative si
loner
19. Remarks. Blocks 6. 13 include only produced gas from Northstar (.e. no purchased gas) Gas purchased from PBU was used as follows (all in meet): fuel gas
605,795, pilot purge 2670, injection 1,363,350.
I hereby certify that as foregan9
/
Signature
Is ue and ect to the best of my knowletlge.
Title Manager, Production Taxes and Royalties A laska
to pressure of 14.65 psia and to a
temperatur of 60o F. Authority 20
AAC25.235.
Panted Name Bernard W. Halt
/� f
Phone r907)564-5028 Date e / e) 'C7
Form 10 -422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
Sae
a
Northstar Gas Flaring Incident Report
9/1/2007 - 9/30/2007
Stan Date / Time End Date / Time
Planned Less Than 1 Hour
Planned
Unplanned
Unplanned
• 09072007 20:42
209/102007 18:19
09/102007 18:29
09/11/2007 0508
09/112007 05:14
09/18/2007 15.41
"09/182007 16 49
Greater Than 1 Hour
Less Than 1 Hour
Greater Than 1 Hour
09/07/2007 22:22
09/112007 04:52
09/11/2007 04:51
09/11/2007 09:00
09/11/2007 09:35
09/18/2007 18:32
09/18/2007 1822
Minutes
Group Total
Group Total
Group Total
100.00
633.00
622.00
23200
261.00
171.00
93.00
Group Total
Report Total
MCF Incident Cause / Description
1,249
0
2,888
1.387 HP -8 shutdown
2,177 Purging LP Compressor for restart.
8.750 Purging LP Compressor for restart.
957 LP compressor failed to restart following an
unplanned NFC BESD of the facility.
1.181 HPA remained S/D due to trouble with the LP
conpresaar. Flaring from glycol contactor.
748 Purging LP Compressor for restart.
188 Purging LP Compressor for restart.
\I 15.386
19,523
Remediatlon Taken
HP48 Restart
None normal sten sequence.
None normal start sequence.
Continue to troubiethoot the LP conpnaoi and
restart the equipment.
Adjusted wells to reduce flaring and ultimately
restart the LP compressor.
None needed, normal start sequence. Upset
None needed, normal start sequence. Upset
Event Type Flan
Upset HP2
Upset LP
Upset HP1
Equipment Outage LP
Egteprnent Outage HP1
LP
HP1
FlarelncidentDetails Sep 2007 FINAL.xls 1012/2007 2:24 PM
1 Facerty Number
0290000025
2. Facility Name
NI
3 Field
Northstar
4 Operator
BP
5 MonttWear of Deposition
Oct -2007
Disposition
Volume MCF
20. For p oduction from multiple pools. list contribution of eadl pool as a percent of Total
Vol u1110.
e. Sold
0
Pool Name
Pod Code
Percent
7. Reinjected
12,829,826
Northstar
590100
100.0%
Northstar
590500
0.0%
9. Flared or vented 1 hour or bas
5,361
9. Flared or vented more than 1 hour (see Instr.)
11,834 ./
10. Pilot and Purge
0
11 Used for lease operations (specify in Remarks)
0
12 Other (see instntcaans)
0
Official Use Only
Authonzatiol >1 tu.
Safety
f1,8
MCF
13. TOTAL VOLUME (ITEMS 6 - 12)
12,847,021
Lease Use
MCF
t4. NGL Gas Equivabfa
Conservation
MCF
15. Purchased gas
1,907,199
Waste
MCP
16. Transferred ham:
^7
� /2 — ,',/ 0
m siarner Date
17. Transferred to: (Express as a negative e)
is Remarks. Blocks 6 - 13 include only produced gas from Northstar (
640,042, pilot purge 2759, injection 1,264.398.
.e. no purchased gas) Gas purchased from PBU was used as follows (all in disci): fuel gas
i tereby certify that the foregoing is true and correct 10 me best of my knowledge.
� �, ,,, "'
Signature ( Z L,F �- .4 (ALL -, f�`t ' Title Manager, Production Taxes and Royalties Alaska
Note: All volumes must be corrected
to pressure of 14.65 pale and to a
temperature of 60o F. Authority 20
AAC25.235.
Printed Name Bernard W. Hajny Rhone (907)564 -5028 Date )) / 1/ &.CO 7-
4
Form 10 -422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
SBA
Northstar Gas Flaring Incident Report
10/1/2007 - 10/31/2007
Start Date / Time End Date / Time
Planned Less Than 1 Hour
Planned
x/0/18/2007 14:58
( 10/182007 14:59
10202007 21:19
1020/2007 22:12
10/21/2007 03:03
<10/31/2007 18:54
10/31/2007 21:52
Unplanned
Unplanned
10/17/2007 16:48
10/18/2007 08:12
10/18/2007 11:18
10/31)2007 17:48
Greater Than 1 Hour
10/19/2007 01:34 636.00
10/19/2007 01:13
10/212007 02'55
10/21/2007 02:48
10/21/2007 04:06
11/012007 00:22
10/31 /2007 23:59
Less Than 1 Hour
Greater Than 1 Hour
10/17/2007 17:57 69.00
10/18/2007 09:31 79.00
10/18/2007 13:26 128.00
10/31/2007 2101
Minutes MCF
Group Total 1,507
2,329
614.00 2,203
336.00 803
276.00 454
63 00 121
328.00 529
127.00 407
Group Total 6,846
Group Total 3,854
193.00 3.680
Group Total 4,988
Report Total
17,195
Incident Cause / Description
LP purge prior to startup
LP purge prior to startup
IS startup. purge and venting X2
LP startup, purge and venting X2
LP startup, purge and venting X2
Preparing for an LP Compressor start none
Increasing Production for an LP Compressor none
713 HPA went down on a fuel gas valve motor
nature. LP went down at same time. Trouble
shooting LP
336 HPA went down on a fuel gas valve motor
failure. LP went down at same time. Trouble
shooting LP
HPB Shutdown
Remediation Taken
Nome
None
None taken
None taken
None taken
260 Flaring from LP vessels until the LP Compressor Start and bad the LP Compressor.
is started and loaded.
Shut 111 all oil we113.
Shut in as oil webs.
Troubleshoot shutdown
Event Type
Flare
LP Purge Gas IP
LP Purge Gas HP1
Plant Startup LP
Plant Startup HP1
Plant Startup LP
Plant Startup LP
Plard Startup HP1
Equipment Outage LP
Equipment Outage HP1
Equipment Outage LP
Equipment Outage HP1
FlarelncidentDetails Oct 2007 FINAL xls 11/2/2007 10:31 AM
1 Facility Number
0290000025
a Faokty Name
Ni
3. Field
Northstar
4 Operator
BP
5. MondWeer or Dlaposidon
Nov - 2007
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of Total
Volume.
O. Sold
0
Pod Name
Pool Code
Percent
7. Reinjected
13,763,968
Northstar
590100
100.0%
Northstar
590500
0.0%
S. Flared or vented 1 hour or leas
3.059 - '
9. Flared or vented more than 1 hour (see instr.)
2,604
10 Pilot are Rage
0 ✓
11. useo for lease bperat ors (Splay n Remarks)
0
12. Other (see instructions)
0
A ' ;: P M Usie Raly , ee astrass ` Mks.
.. Is
Authorization > 1
Safety
S
2 k °4-
MCF
13. TOTAL VOLUME (ITEMS 6-12)
13,769,631
Lease Use
MCF
14 NGL Gas Equivalent
Conservatkln
MCF
15 Purchased gas
1,896,513
Waste
MCF
16. Transferred horn.
v 1—,tog
Co missaner Data
17 Transferred to (Express as a negative 4)
It Remarks. Blocks 6 - 13 include only produced gas from Northstar (.6. no purchased gas) Gas purchased from PBU was used as follows (alt in matt): fuel gas
657,382, pilot purge 2670 injection 1,236,461.
I hereby certify that the foregoing is true and core to 1M best of my knowledge.
Signature / Title Manager, Production Taxes and Royalties Alaska
Note: All volumes must be corrected
t0 pressure of 14.65 pale and t0 a
temperature of 60o F. Authority 20
AAC25.235.
!!
Pnmed Name Bernard W. Hajny Phone 1907)564.5020 Date /j -/e C>
Form 10 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submt in Duplicate
Northstar Gas Flaring Incident Report
11/1/2007 - 11/30/2007
Start Date / Time End Date / Time Minutes MCF Incident Cause / Description Remediatlon Taken Event Type Flare
Planned Less Than 1 Hour
Group Total 1,894
Planned Greater Than 1 Hour
11/012007 00'13 11/01/2007 01:30 77.00 406 HPB Restart none HPB Purge Gas HP1
Group Total 406
Unplanned Less Than 1 Hour
Group Total 1,165
Unplanned Greater Than 1 Hour
11/012007 02:44 11/01/2007 04:04 8000 132 HPB Shutdown none Equipment Outage HP1
11/08/2007 16:53 11/08/2007 18:00 6700 2,066 HPA shut down high level in 4th Stage Restarted HPA Upset HP1
Group Total 2,198
Report Total 5,663
FlarelncidentDetaits Nov 2007 FINAL.xIs 12/6/2007 2:56 PM
1 Facility Number
0290000025
2 Faculty Name
N1
3. Field
Northstar
4. Operator
BP
5. Mont /Year of Disposition
Dec - 2007
Disposition
Volume MCF
20. For p odhxdion from mulbple pools, list contribution of each pool as a percent of Total
Volume.
8. Soltl
0
Pool Name
Pool Code
Percent
7 Reinjected
14,847,138
Northstar
590100
100.0%
Northstar
590500
0.0%
8 Flared or vented 1 hour or less
2,529
9 Flared or vented more than 1 tour (see instr.)
4 322
10. Pilot and Purge
0
11. Used for lease operation (specify in Remarks)
0
Auihonlat.:n >1 hr.
�
a %
MCF ^-
-/
12. Other (See instructions)
0
13. TOTAL VOLUME (ITEMS 8 -12)
14,853,989
Lease Use
MCF
14. NOL Gas Equivalent
Conservation
MCF
15 Purchased gas
1,989,954
Waste
MCF
18. Transferred from
/ D �(�/
'h.om loner / to
17. Transferred to: (Express as a negative e )
18. Remarks: Blocks 6 • 13 include only produced gas from Northstar (.e. no purchased gas) Gas purchased from PBU was used as follows (all in msct): fuel gas
701,333, pilot purge 2759, injection 1,285,862.
1 hereby certify that the foregoing
is true and correct toe* best of my knowledge.
' /) TItle Manager. Production Taxes and Royalties Alaska
Note: All volumes must be corrected
to pressure of 14.65 psla and to a
temperature of 60o F. Authority 20
AAC25.235.
Signature
n (((/// P hone e'er
Footed Name Bernard W. Ha j y ( 7)554 -5026 Date /— `J"
•
Form 10 -422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
1
1
Northstar Gas Flaring Incident Report
12/1/2007 - 12/31/2007
Start Date / Time
Planned
Planned
Unplanned
Unplanned
12/01/2007 12:34
12/01 /2007 1326 12/01/2007 15.39
12/072007 23:44
12/07/2007 23:44
12/20/2007 09:48
End Date / Time
Less Than 1 Hour
Greater Than 1 Hour
Less Than 1 HOW
Greater Than 1 Hour
12/01/2007 16.11
12/08/2007 01106
12(082007 01:21
12/20/2007 10:49
Minutes MCF
Group Total 0
Group Total 0
Group Total 2,529
217.00 2,046
133.00 490
8200 445
97.00 494
61.00 848
Group Total 4,322
Report Tonal 6,851
Incident Cause / Description
Upset in the Inlet Scrubber cascaded into a
OSD, LP and HPA compressor outage. Flaring
from IP Separator and NGL system HPB
contEued to canpress HP gas.
Upset in the Inlet Scrubber cascaded into a
OSD. LP and HPA compressor outage. Flaring
from al LP vessels. HPB continued to compress
HP gas.
LP Compressor shut down due to a false
vibration signal. Flaring from LP vessels.
LP Compressor shut down due to a false
vbration signal. Flaring from IP Separator.
Hp 8 went down on acoustic problems
Remediatkm Taken
AN weir) shut in automatically.
Nt wells shut in automatically.
Shut in High GOR wells NS-6, 8, 13, 14 8 18 b
mitigate flaring.
Shut in High GOR wells NS-6, 8, 13, 14 8 18 to
mitigate flaring.
Restarted HP several times.
Event Type
Upset
Upset
Equipment Outage
Equipment Outage
Equipment Outage
Rare
HPt
LP
LP
HP1
HP1