HomeMy WebLinkAboutPBU CGF B / BPSTATE OF ALASKA
AOGCC
GAS DISPOSITION FILES
YEAR: 2007
FACILITY: PBU CGF B
OPERATOR: BP EXPLORATION
Facility Number
0290000008
I1. 2. Facility Name
3 Field
4. Operant S. Month/Year d Disposition
IBP January
PBU CGF B
PBU - EOA
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pod as a percent of
Tom Volume.
6. Slid
2,382,039
Pool Name
Pool Code
Percent
7. Reinjected
8,183,804
PRUDHOE
640150
100.00%
8. Flared or vented 1 hour a less I / L50
.2,2n
rlm
9. Flared or ved mare man , hour (see Irlstr.) 65, �lo
10. Pad and Purge
23,583
11. Used for lease operations (sgecsy ki Remarks)
3,356,011
12. Other lees instructions)
0
Authorization >, rm
Seley
6sibE6
MCF
13. TOTAL VOLUME us e -121
Man
14.012.393
Lease Use
MCF
14. NGL Gas Equivalent
2,382,039
Conservation
MCF
15. Purchased gas
0
Waste.
MCF
16. Transferred from: FSt, FS2. FS3, GC1, GC2, GO
247,729,570
5 - 3 - 0
Date
/J
17. Transferred to: (Ecress as a negative 1) FSt, FS2, FS3. CCP 8 GPMA PI.
Mdntyre Ml
_ 717,178
Cortxtlleaforlsr
18. Remarks: Block 11: Fuel Gas = 3307336 msct and Assist Gas = 48,475 Inscf: Block 17: Includes MI Gas to Pt. McIntyre = 2,333,541 muf
e,a ee Ajar; Oaur R arts t t9
6 ZAht F ld > t h
f ks,b6rPuet �(ct� c ute loss d ' -fa make c ince
clbet Awf Rated c l i. both CfrF AI ceweressevs an I'Z4Zrd ? JP 6445 r un- slut ,
ett-tc w lec etA ti -
t.��.tj . .1 6/M7
I hereby certify that the t. - . is true and •• - •• the ben of my knowledge.
signature r et. - - am. rare Manager, Production Taxes and Royalty
Note: All volumes must be
corrected to pressure of 14.65 psla
an
Auth temperature 2 Authority 2 5 2 35. F.
Printed Ware Bernard W. Hajny
Phone (907)564-5028 Date c2 /G Zt 7
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
/2/2007 0100 -0450 3,000
1/2/2007 0706 -1030 10,419
1/2/2007 0706 -1030 1,968
1/2/2007 0830 - 1030 1,312
1/2/2007 0830 -1030 10.419
1/2/2007 1050 -1443 1,312
1/2/2007 1050 -1443 16,158
1/2/2007 1055 -1443 16.158
1/2/2007 1055 -1443 984
TOTAL
TOTAL
64,682
430
TOTAL 0
'_;;„i TOTAL
Unplanned Events <1 Hour 1,844
Unplanned Events > 1 /bur 64 682
Planned Events < 1 hour and not 430
exceeding 5,000 MCF
Planned Events >1 has or 0
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
Ma 2%563
Nal 48.475
139,014
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
January 2007
(Unplanned Events less than or equal to 1 hour
1
DATE ._ TIME ,,,,_ VOLUME DESCRIPTION OF INCIDENT a CAUSE
1 /2/2007 0530 -0605 984 Not required for unplanned events which
1/4/2007 1436 -1509 430 are less than or equal to 1 hour
1/7/2007 0957 -1039 430
TOTAL 1,844
(Unplanned Events greater than 1 hour
DATE ,,...., TIME r=: VOLUME DESCRIPTION OF INCIDENT & CAUSE . ......... ...,w..w ACTION TAKEN TO ELIMINATE CAUSE
1/2/2007 0100 -0450 2,952 See attachments See attachments
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME W . , , VOLUME DESCRIP OF INCIDENT & CAUSE r: ,, ACTION TAKEN TO ELIMINATE CAUSE___.
1/14/2007 0915 -0925
430 See attachments See attachments
(Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
1
VOLUME DESCRIPTION OF INCIDENT A CAUSE,
See attachments
ACTION TAKEN TO EUMINATE CAUSE ...,,,
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO EUMINATE CAUSE,„ „, „,„„„,
See attachments
Page 1
2/11/2007
3'.13 PM
Flare Start Date 1/1/2007
Flare End Date 1/31/2007
Report
CGF Flare Report
Time Of Flaring
Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume (MSCF)
07 -2 Flare Relief 1/2/2007 1:00:00 AM 4:50:00 AM 230 minutes Yes No No BPIIZUGGRC 2952
Determination Cause TTC 1855 shutdown due to contrdtinstrumentation taiure associated
with 1855. Meter #618.
Action Taken
07 -2 Flare Relief 1/2/2007 7:06:00 AM 10:30:00 AM 204 minutes Yes
Field production was cut to lower gas production until 1855 T/C
restarted.
07 -2 Flare Relief 1/2/2007 1:00:00 AM 4:50:00 AM 230 minutes Yes No No BP1IZUGGRC 3000
Determination Cause Extended flaring event occurred while awaiting operator/maintenance
evaluation. Meter # 660.
Action Taken
Field production was cut to lower gas production until 1855 T/C
restarted.
Determination Cause T\C 1805 shutdovm due to controainstrumentation tenure associated
with 1805. Meter # 660.
Action Taken
Field production was cut to lower gas production until 1805T/C
restarted.
07-2 Flare Relief 1/2/2007 7:06:00 AM 10:30:00 AM 204 minutes Yes No No
Determination Cause Tit 1805 shutdown due to contrONnstrumentation failure associated
with 1805. Meter M 618.
Action Taken
Field production was cut to lower gas production until 1805 T/C
restarted.
No No BP1\ZUGGRC 10419
BPIIZUGGRC
1968
Flare Start Date 1/1/2007
Flare End Date 1/31/2007
Report
Action Taken
Action Taken
Action Taken
CGF Flare Report
Time Of Flaring
Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume (MSCF)
07-2 flare Relief 1/2/2007 8:30:00 AM 10:3J:00 AM 120 minutes Yes No No BP1\ZUGGRC 1312
Determination Cause 'RC 1855 shutdown due to controNnstnmentation failure associated
with 1855. Meter a 618.
Action Taken
Field production was cut to lower gas production until 1855 T/C
restarted.
07 -2 Flare Relief 1/2/2007 8:30:00 AM 10:30:00 AM 120 minutes Yes No No 8P1\ZUGGRC 10419
Determination Cause T\C 1855 shutdown due to controninstrumentation failure associated
with 1855. Meter N 660.
Field production was cut to lower gas production until 1855 T/C
restarted.
07 -2 Flare Relief 1/2/2007 10:50:00 AM 2:43:00 PM 233 minutes Yes No No BPI\ZUGGRC 1312
Determination Cause 11C 1805 shutdown due to controltinstnmentatlon failure associated
with 1805. Meters 618.
Action Taken
Completed troubleshooting, reloaded 1805 TIC, and stabilized
facility process and operation.
07 -2 Flare Relief 1/2/2007 10:50:00 AM 2:43:00 PM 233 minutes Yes No No 13P1\ZUGGRC 18158
Determination Cause INC 1805 shutdown due to contro(instnmentation tenure associated
with 1805. Meter 0 660.
Completed troubleshooting, reloaded 1805 T /C, and stablized
facility process and operation.
07-2 Flare Relief 1/2/2007 10:55:00 AM 2:43:00 PM 228 minutes Yes No No BP1\ZUGGRC 16158
Determination Cause T1C 1855 shutdown due to controNnstrumentation failure associated
with 1855. Meters 660.
Completed troubleshooting, reloaded 1855T/C, and stabilized facility
process and operation
Flare Start Date 1/1/2007
Flare End Date 1/31(2007
Time 01 Flaring
Report Date Start Time Stop Time Duration intermittent Black Smoke Planned Reported By Volume (MSCF)
07.2 Flare Relief 1/2/2007 10:55:00 AM 2:43:00 PM 228 minutes Yes No No BP1IZUGGRC 984
Determination Cause INC 1855 shutdown due to controNnstrumentatlon failure associated
With 18.55. Meter 0 618.
Completed trouaeshoodn9. reloaded 1855 T/C, and staWized
facility process and operation.
Action Taken
CGF Flare Report
07.31 Controlled 1/14/2007 9:15:00 AM 9:25:00 AM 10 minutes Yes No Yes BP1\MURRIEMA 430
Blowdown
Determination Cause T/C 1883 shutdown due to problem at FS -1 and for panned HGP
maint.
Action Taken Skid down down to 0 psi.
FW: GPB Gas Flaring Incident
1of1
Subject: FW: GPB Gas Flaring Incident
From: "GPB, Prod Opt TL" <GPBProdOptTL @BP.com>
Date: Wed, 03 Jan 2007 14:20:36 -0900
To: steve mcmains@admin.state,ak.us ,i,s , 414.wr.:
Didn't go through the first time. ht
Subject: FW: GPB Gas Flaring Incident
To: Steve McMains, AOGCC
steve_mcma i ns @admin. state. ak. us
907 - 793 -1241, fax 907- 276 -7542
Hal Tucker
GPB Prod Optimization Team Leader
(907)- 659 -44
From: GPB, Prod Opt TL
Sent: Wednesday, January 03, 2007 1:51 PM
To: " sieve _mcmains@admin.state.ak.us'
Cc: GPB, Environ TL; GPB, Environ Advisor West; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; GPB, Gas Plants Area
Mgr; Kurz, John
From: Hal Tucker, GPB Prod Optimization Team Leader
An extended flaring event occurred at GPB on January 2, 2007.
CGF lost both MI compressors (1805 and 1855) due to low ambient
temperatures ( -38F). "GE PLC cold temperature shut down" was the initial shut
down trigger. Either one or both of the machines were down intermittently from
01:00 until 14:43. Multiple restarts were attempted during this time. Liquid fall
out from the inter - coolers into the suction drums (due to low ambients}
repeated shut downs, and trouble restarting and loadin es. Total
flare time while attempting to bring the machines b on line was 11 hdurs
and 7 minutes. Total flared volume due to this eve was 65.7 MMSCF.
If you require additional information, please don't hesii t: o call m
64 bg2 ger (>11w..)
( *dd MCP (4I1k2)
1/4'2007 7:17 AM
GPB Gas Flaring Incident
Subject: GPB Gas Flaring Incident
From: "GPB, Prod Opt TL" <GPBProdOptTL @BP.com>
Date: Sat, 13 Jan 2007 13:40:48 -0900
To: steve_mcmains@admin.state.ak.us
CC: "GPB, Environ TL" <GPBEnvironTL@BP.com >, "GPB, Environ Advisor West"
<GPBEnvironAdvisorWest@BP.com >, "GPB, Environ Advisor East"
<GPBEnvironAdvisorEast @ BP.com>, "Fiedler, Anne M" <Anne.Fiedler@bp.com >, "Benson, Gary
A" <Gary.Benson @bp.com >, "Pfeiffer, Jim A" <Jim.Pfeiffer@bp.com >, "Kurz, John"
<john.kurz@bp.com >, "GPB, GC2 AMS" <GPBGC2AMS @BP.com >, "GPB, FSI /SIP /STP Area
Mgr <GPBFS1TL@BP.coth >, "GPB, Gas Plants Area Mgr" <GPBGasPlantsT a,BP.co» >:
To: Steve McMains, AOGCC
seve mcmains @admin.state.ak.us
907- 793 -1241, fax 907 - 276 -7542
From: Michael Bolkovatz. GPB Prod Optimization Team Leader
An extended flaring event occurred on January 11, 2007.
CGF Booster compressors 1801 and 1802 tripped offline due to a faulty high
pressure discharge switch. As a result, the transit gas pressure rose to the
facility flare pressure limit. In order to reduce /maintain the transit gas pressure,
flaring was initiated at FS1 and GC2. FS1 flared for 50 minutes and the total
volume flared was 8333 MSCF. GC2 flared for 44 minutes and the total
volume flared was 6111 MSCF.
Even though the event lasted less than 1 hr, I felt an explanation would be
useful given the volumes flared.
If you require additional information, please don't hesitate to call me.
Michael Bolkovatz
GPB Prod Optimization Team Leader
(907) 659-5566
I of I 1/16,2007 8:28 AM
1 Facility Number
0290000008
2 Facile Name
PBU CGF B
3 Field
PBU • EOA
14. Operator
BP
5. MonWYtwr d
February Dillposition
Disposition
Volume MCF
20. For production from mulilple pools. list contribution of each pod as a percent of
Total Volume
6. Sold
2,210,827
Pod Name
Pool Code
Percent
7. Reinjected
7,647,487
PRUDHOE
640150
100.00%
8. Flared Or vented l hour or less
930
9. Flared or vented more than 1 row (see nstr.)
0
10. Psot and Purge
21 823
11. Used tor lease operations (specify In Remarks)
3,150,008
12. O6ur (sea instructions)
0
Authorization >1 hr.
Safety
MCF
13. TOTAL VOLUME (ITEMS 6-12)
13,031,075
Lease Use
MCF
14. NGL Gas Equivalent
2,210,827
Conservation
MCF
15. Purchased gas
0
Waste.
MCF
16. Translated tom: FS1. FS2, F53. GC1, GC2. GC3
230,701,668
Commissioner Date
17. Transferred to. (Express as a negative 0) F51, F82, FS3, CCP 6 GPMA Pt,
McIntyre MI
- 217,670,593
18. Remarks. Block 1 l: Fuel Gas = 3,109,524 mut and Assist Gas = 40,484 m cf: Block 17: Includes MI Gas to Pt. McIntyre = 1,726,993 mscf
I hereby certify that m oregoirp true rid act to the best of my knowledge.
Signature Tote Manager, Production
Taxes and Royalty
1
Date 1 � 7
Note: All volumes must be
corrected to pressure of 14.65 psla
and ut a temperature 5.35. F.
Authority 20 AAC25.235-
Printed Name Bernard W. Hajny Phone (907)564 -5028
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
$Unplanned Events less than or equal to 1
hour
1
DATE
2/10/2007
2/22/2007
2/24/2007
TIME
1345 -1352
1320 -1330
0950 -1000
TOTAL
!Unplanned Events greater than 1 hour
1
DATE -. - TIME. .. VOLUME
TOTAL
`Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
1
, DATE , TIME VOLUME
TOTAL
!Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
1
DATE . TIME
TOTAL
VOLUME
100
400
VOLUME
430
930
0
0
0
TOTAL
Unplanned Events c 1 Hour 930
Unplanned Events> 1 Hour 0
Planned Events c 1 hour and not 0
exceeding 5,000 MCF
Planned Events > 1 hour or 0
exceeding 5,000 MCF
Pilot Purge MS 21,823!
Assist ISIS 40.4841
TOTAL FLARED VOLUME 63,237
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
February 2007
DESCRIPTION OF INCIDENT & CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
DESCRIPTION OF INCIDENT & CAUSE, „, , : ..,
See attachments
DESCRIPTION OF INCIDENT & CAUSE
See attachments
ACTION TAKEN TO EUMINATE CAUSE •,�,.,;:,,,,
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO EUMINATE CAUSE„ ,,;
See attachments
DESCRIPTION OF INCIDENT & CAUSE • ACTION TAKEN TO ELIMINATE CAUSE „�,,,,., ; , ; � ; � F , ; .,,,
See attachments See attachments
ACTION TAKEN TO EUMINATE CAUSE,
See attachments
e
Page 1
3/5/2007
2:39 PM
1. Fatally Number
0290000008
2 Facility Name
PBU CGF B
3 Frets
PBU - EGA
4. Operator
BP
s. MontlWeard DiapoSdior,
March - 2007
Disposition
Volume MCF
/
✓
20. For production from multiple pods, list contnbution of each pool as a percent of
Total Volume
6. Sold
2,387,233
Pool Name
Pool Code
Percent
7. Reinjected
7,871,705
PRUDHOE
640150
100.00%
8 Flared or vetoed 1 hour or less
562
9 Flared or vented more than 1 hour (see instr.)
928
10. Pad and Purge
24,204
11. Used for lease operations (specify m Remarks)
3,464,259
12. Other (see instruclbns)
0
,.
Authorization >1 hr.
N Safe
1 L U
MCF
13. TOTAL VOLUME (ITEMS 8-12)
13,748,891
Lease Use
MCF
14 NGL Gas Equivalent
2,387,233
Conservation
MCF
15. Purchased gas
0
Waste
MCF
16. Transferred from e FS1, FS2, FS3, GC1, GC2, GC9
255,947,016
m isslorler ate
r`"`��--' 4-- -a 7
17. Transferred to: (Ecress as a negative 1) FS1, FS2, FS3. CCP 8 GPMA P1.
Mdntyre Ml
- 242,198,125
,e. Remarks: Block 11: Fuel Gas = 3.420,495 inset and Assist Gas = 43,764 mscf; Block 17: Includes M1 Gas to Pl. McIntyre = 1,691,939 mscf
i hereby coney inat the foregoing is hue and ...•.. to the best of my knowledge.
/
sgnahre j ,SIVj Title Manager, Production Taxes and Royalty
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 60o F.
Authority 20 AAC25.235.
oted Name Bernard
Printed
Jr
W. Rainy Phone (907)564 -5026 Date 6
�
•
Form 10 -422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
1
'Unplanned Events less than or equal to 1 hour
VOLUME DESCRIPTION OF INCIDENT & CAUSE
91 Not required for unplanned events which
are less than or equal to 1 hour
DATE
3/10/2007 1250 -1300
DATE
3/29/2007
3/29/2007
DATE
3/12/2007
3/12/2007
3/31/2007
DATE
TIME
TOTAL
TIME
1029 -1157
1145 -1158
TOTAL
TIME
1356 -1414
1549 -1606
1305 -1332
TOTAL
TIME
TOTAL
Pilot Purge
Assist
TOTAL FLARED VOLUME
91
BP EXPLORATION (ALASK >) INC.
PRUDHOE BAY UNIT - CENTRAL. GAS FACILITY
GAS FLARING INCIDENT REPORT
March 2007
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
(Unplanned Events greater than 1 hour
1
TOTAL
Unplanned Events c 1 Hour 91
Unplanned Eventa > 1 Hour 928
Planned Events c 1 hour and not 471
exceeding 5,000 MCF
Planned Events > 1 hour or 0
exceeding 5,000 MCF
VOLUME DESCRIPTION OF INCIDENT & CAUSE
541 See attachments
387
928
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
`Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
1
VOLUME DESCRIPTION OF INCIDENT & CAUSE
430 See attachments
35
6
471
`Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
1
VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
0
4t*T . 24,204
43,764
69
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Page 1
4/5/2007
9:51 AM
Flare Start Date 3/1 /2007
Flare End Date 3/31/2007
CGF Flare Report
Time Of Flaring
Report Number Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume (MSCF)
07 -88 Flare Relief 3/12/2007 1 AM 2:14:00 AM 18 minutes No No Yes BPI \GRANTIDE 430
Determination Cause PC 1884 shutdown for planned maintenance
Action Taken 1884 T/C depressurized and shut down.
07 -88 Flare Relief 3/12/2007 3:49:00 AM 4:08:00 AM 17 minutes No No Yes BP1 \GRANTIDE 35
Determination Cause PC 1884 shutdown for planned maintenance. (After spin cooling
completion)
Action Taken
1884 T/C depressurization complete.
07 -109 Flare Relief 3/29 /2007 10:29:00 AM 11:57:00 AM 88 minutes No No No BPI \CARIELL
Determination Cause PC 1805 shutdown for unplanned maintenance. Cracked Weldolet on
Suction piping going to 'B. Compressor.
Action Taken
Action Taken
Process stabilized throughout the plant.
07 -109 Flare Relief 3/29/2007 11:45:00 AM 11:58:00 AM 13 minutes No No No BP1 \CARIELL 387
Determination Cause PC 1805 shutdown to unplanned maintenance
Action Taken 1805 T/C depressurized and shut down.
07 - 111 Flare Relief 3/31/2007 1:05:00 PM 1•2:00 PM 27 minutes NO No Yes BP1 \CARIELL
Determination Cause CCP's PC 1804 shutdown due to controNnstrumentation failure
associated with F127 bypass.
Field production was cut to tower gas production until CCP's 1804
T/C restarted.
541
8
1. Fealty Number
0290000008
2 Faced) Name
PBU CGF 6
3 Field
PBU - EOA
4. Operator
BP
5 MonttWear of Disposition
April - 2007
Disposition
Volume MCF
20. For production from multiple pods. list contribution or ear% pool as a percent of
Torsi Volume.
6. Sold
2,116,538
Pool Name
Pool Code
Percent
7. Real)ected
6,869,924
PRUDHOE
640150
100.00%
6. Flared or vented 1 row or less
8.262
9 Flared or vented more than 1 Ins (see alstr.)
0
10. Rot and Purge
19.821
11. Used tor lease operations (specify in Remarks)
3,186,100
12. Other (see Instructions)
0
rte.
...- .asO 1pr tir. " ,'`
16
Authorization 1 hr.
f
Safety
MC
13. TOTAL VOLUME (ITEMS 6-12)
12,200,645
Lease Use
MCF
14 NGL Gas EpavaleM
2,1 16,538
Conservation
MCF
15. Purchased gas
0
Waste
MCF
16. Transferred from. F51, F52, FS3, °C1, GU, GC3
230 130 022
commissioner Date
17. Transferred b: (Express as a negative a) F51, FS2, FS3. CCP & OPMA PL
McIntyre MI
- 217 938 463
10. Remarks. Block 11: Fuel Gas = 3,131,988 mscf and Assist Gas = 54,112 mscf: Block 17: Includes Mt Gas to Pt. McIntyre = 1.687,721 mscf
I hereby certify that the foregoing
signature aria'
is true and correct to the best of my knna4edge.
mie Manager, Production Taxes and Royalty
Note: All volumes must be
corrected to pressure of 14.65 psis
and to a temperature of 60o F.
Authority 20 AAC25.235,
S.
Printed Name Bern . rd
'
W. Hajny Phone (907)564 -5028 Date S – /c /'v7
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
!Unplanned
Events less than
or equal to 1 hour
1
DATE
4/1/2007
4/2/2007
4/4/2007
4/4/2007
4/4/2007
4/4/2007
4/4/2007
4/6/2007
4R/2007
4/7/2007
4/8/2007
4/8/2007
4/8/2007
4/8/2007
4/8/2007
4/8/2007
4/9/2007
4/9/2007
4/22/2007
DATE
DATE
4/1/2007
4/2/2007
4/6/2007
4/6/2007
TIME
1646 -1718
0310 -0325
1115 -1130
1430 -1440
1625 -1635
1725 -1735
1805 -1815
2310 -2320
1850 -1900
2015 -2020
0410 -0420
0530 -0540
1925 -1935
2005 -2015
2040 -2050
2135 -2145
1516 -1539
1516 -1526
0010 -0015
TOTAL
TIME
TOTAL
TIME
0235 -0257
0150 -0215
0235 -0245
0235 -0245
VOLUME DESCRIPTION OF INCIDENT & CAUSE
430 Not required for unplanned events which
400 are Tess than or equal to 1 hour
213
387
387
387
387
195
195
100
328
100
310
280
328
387
1,890
328
190
7,222
!Unplanned Events greater than 1 hour
1
0
!Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
1
TOTAL 1,040
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
April 2007
_ VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
VOLUME DESCRIPTION OF INCIDENT & CAUSE
400 See attachments
190
225
225
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE...,
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Page 1
5/8/2007
10:34 AM
Atm
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
1
DATE
TIME
TOTAL
VOLUME
0
TOTAL
Unplanned Events c 1 Hour 7 222
Unplanned Events> 1 Hour 0
Planned Events < 1 hour and not 1,040
exceeding 5,000 MCF
Planned Events > 1 hour or 0
exceeding 5,000 MCF
Pilot Purge
19,82T
Assist WSW - 54,112
TOTAL FLARED VOLUME 82,195
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
April 2007
DESCRIPTION OF INCIDENT & CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Page 2
5/8/2007
10:34 AM
Flare Start Date 4/1/2007
Flare End Date 4/30/2007
CGF Flare Report
Time Of Flaring
Report Number Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume (MSCF)
07 -113 Flare Relief 4/1/2007 2:35:00 AM 2:57:00 AM 22 minutes No No Yes BP1\YOUNGBDV 400
Determination Cause SD T\C 1883 and depressured for water wash
Action Taken 1884 T/C depressurization completed
07 -115 Flare Relief 4/2/2007 1:50:00 AM 2'15:00 AM 25 minutes No No Yes BPI \VOUNGBOV 190
Determination Cause SD T\C 1885 and depressured for water wash
Action Taken completed lowdown
07 -132 Flare Relief 4/6/2007 2:35:00 AM 2:45:00 AM 10 minutes No No Yes BP1 \MURRIEMA 225
Determination Cause T/C 1802 shutdown for turbine waterwash.
Action Taken Unit depressurization to 0 psi complete. Meter 618
07 -132 Flare Relief 4/6/2007 2:35:00 AM 2:45:00 AM 10 minutes No No Yes BP1\MURRIEMA 225
Determination Cause T/C 1601 shutdown for turbine swap.
Action Taken Unit depressurization to 0 psi complete. Meter 618
1 Facility Number
2 Facility Name
PBU CGF B
3 Field
PBU - EOA
4. Operator
I BP
5. Month/Year M Disposition
May -2007
Disposition
Volume MCF
20. For production from multiple pods, list cunt button of each pool as a percent of
Total Volume
6. Soo
2,153,976
Pool Name
Pod Code
Percent
7. Reinjected
7,712,172
PRUDHOE
640150
100.00%
8. Flared or vented 1 hour or less
12,261
9 Flared or vented more than 1 hour (see Instr.)
0
10. Pad and Purge
18,647
11. Used for lease operations (specify in Remarks)
3.343,457
-wr
12. Older (sea fnstruclbrls) htECE1VED
0
AutlgdT2kon ,, ,.
Safely
MCF
13. TOTAL VOLUME (ITEMS 8
JUN 2 2 2007
13,240,513
Lease Use
MCF
14. NGL Gas Equivalent
2,153,976
Conservation
MCF
Ablate Oil 6 tact cons.
15. Purchased gas
Anchorage
0
Waste
MCF
18. Transferred ban FS1, FS2. FS3, Gel, GC2, GCS
241,301,631
Commissioner Date
17. Transferred to: (Eq,rlrss as a negative e) FS1, FS2. FS3. CCP 8 GPMA Pt
McIntyre M1
- 228,061,118
18. Remarks. Block 11: Fuel Gas = 3,307,211 mscf and Assist Gas= 36,246 mscf; Block 17: Includes MI Gas to Pt. McIntyre = 1,783.844 mscf
I hereby certify that the foregoing is Km and correct to the best of my knowledge.
///✓��__ /�
Signature / QZ (34— I..,44y, 4e Tree Manager, Production Taxes and Royalty
Note: All volumes must be
corrected to pressure of 14.65 pale
and to a temperature of 60o F.
Authority 20 AAC25.235.
J e
Printed Name Bernard W. Hajny Phan 007)564.502s Date bit I O 7
Form 10-422 Rev. 1 /2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
•
(Unplanned Events less than or equal to 1
hour
1
DATE
5/31/2007
5/31/2007
5/31/2007
TIME
1549 -1648
1652 -1715
2045 -2055
TOTAL
VOLUME
7,125
4,749
387
12,261
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
May 2007
DESCRIPTION OF INCIDENT 6 CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
'Unplanned Events greater than 1 hour
1
DATE
'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
1
DATE
TIME
TOTAL
TIME
TOTAL
_ VOLUME. DESCRIPTION OF INCIDENT & CAUSE _
See attachments
0
VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
0
ACTION TAKEN TO ELIMINATE
See attachments
attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
"Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
1
DATE
TIME
TOTAL
0
TOTAL
12261
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour 0
Planned Events < 1 hour and not 0
exceeding 5,000 MCF
Planned Events > 1 hour or 0
exceeding 5,000 MCF
Pilot Purge POLIttan 18,647!
Assist hefts 36,248i
TOTAL FLARED VOLUME 67,154
VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Page 1
6/13/2007
9:07 AM
GPB Gas Flaring Incident
Subject: GPB Gas Flaring Incident
From: "GPB, Prod Opt TL" <GPBProdOptTL @BP.com>
Date: Sun, 03 Jun 2007 07:56:08 -0800
To: steve_mcmains @admin.state.ak.us
CC: "GPB, Environ TL" <GPBEnvironTL @BP.com >, "GPB, Environ Advisor East"
<GPBEnvironAdvisorEast @BP.com >, "Fiedler, Anne M" <Anne.Fiedler @bp.com >, "Benson, Gary
A" <Gary.Benson@bp.com >, "Pfeiffer, Jim A" <Jim.Pfeiffer @bp.com >, "Kurz, John"
<john.kurz @bp.com >, "GPB, GC OTL" <GPBGCIOTL @bp.com >, "GPB, Area Mgr North (Gas
PlantsIGPMA)" <GPB_AreaMgrNorth @BP.com>
To: Steve McMains, AOGCC
steve_mcmains @admin.state.ak.us
907 - 793 -1241, fax 907 - 276 -7542
From: Dwight Warner, GPB Prod Optimization Team Leader
Extended flaring events occurred last week at Greater Prudhoe Bay.
The event occurred at CGF on May 31. Power interruption caused ESD in NGL
divert module 4935 which resulted in stabilizer section upset, shutting both MI
compressors down. Flaring occurred from 0349 to 0448 (59 minutes), total
volume flared was 7125 MSCF.
Intermittent black smoke events also occurred at CGF on May 31. The first
event was caused when T/C 1855 shutdown due to control /instrumentation
failure that was associated with 1st stage anti -surge controller 55F85AV. The
LTS 1 &2 bottoms temperatures were raised to reduce MI make and stop
flaring. Flaring occurred from 1652 to 1715 (23 minutes), total volume flared
was 4749 MSCF.
The second intermitted black smoke event occurred at CGF on May 31 also.
This event was cause when T/C 1855 was depressured to clear
instrumentation fault. 1855 TIC completed depressuring to end the event.
Flaring occurred from 1845 to 1855 (10 min), total volume flared was 387
MSCF.
On June 1st and additional event occurred at CGF. TIC 1855 shutdown due to
a problem associate with the power interruption in the stabilizer section that
happened on May 31st. The equipment that malfunction was repaired and T/C
1855 was restarted to return facility to normal operation. Flaring occurred from
0940 to 1124 (104 minutes), total volume flared was 635 MSCF
If you require additional information, please don't hesitate to call me.
Dwight Warner
GPB Prod Optimization Team Leader
(907) 659-4472
L of 2 6/4/2007 7:02 AM
1 Facility Number
0290000008
2 Facility Name
PBU CGF 8
3 Field
PBU • EOA
4. Operator
BP
6. MonBWear of Disposition
June -2007
Disposition
Volume MCF
i
20. For production from multiple pods, list contribution of each pod as a percent of
Total Volume.
6. Sdd
1,656,573
Pool Name
Pon( Code
Percent
7. Reinjected
6,065,891
PRUDHOE
640150
100.00%
8. Flared or Witted 1 hours less
16,062 ."
9 Flared or vented more than 1 hour (see instr.)
17,162 .
10. Plot and Purge
15,652 1
11. Used tar lease operations (s(vnys ED
6 L r l e 1
2.103,556
12. Other (see instructions) K Y
0
Olfidal Use Only
Authorization >1 hr.
Safety
I 14, z
MCF
13. TOTAL VOLUME (ITEMS 6 -12) JUL 3 12007
9.874,896
Leese Use
MCF
14. NGL Gas Equrva(ent
Airs a a Oa Cons. Columbia
1,656,573
Conservation
MCF
a �
15. Purchased gas
0
Waste
MCF
18. Transferred from FS1. FS2, FS3, GC1, GC2. GG3
185,144,978
84 o7
�Come Date
17. Transferred to. (Express as a negative *) FS1, FS2, F53. CCP 8 GPMA Pt
MdnMe MI
•175,270,061
ta. Remarks. Block 11. Fuel Gas = 2,056,661 nvxf and Assist Gas a 46,695 abet, Biuck 17: Irtdu es MI Gas to Pt. Mctntyrc = 1,660.950 mscf
1 hereby certify mat the foregoing is true and correct to the last of my knowledge
Signature 0 .. Tine Manager, Production Taxes and Royalty
Note: All volumes must be
corrected to pressure of 14.65 psis
and to a temperature of 60o F.
Authority 20 AAC25.235.
Pnnted Name Bernard W. Hajny Phone (907)564 -5028 Date / r /c,
Form 10 -422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
1. F 0290000008 12. Face ay Name
3 Field
PBU - EOA
IBP �
(June - esraotepa.uore
CU G B
D SPaanlon
Volume MCF
20. Far production from multiple pools, Net oontbudon a each pad as • percent of
Total Volume.
8. saw
1,856,573
Pod Name
Pod Code
Percent
7. ReaNeasd
6,065,891
PRUDHOE
640150
100.0096
8. Flared or vented 1 hour or Tess
18,062
O. Find or venal more than 1 hour (see instil
17.182
to. not anti Purge
46,895
11. Used Ice law operations (specify In Bernell.
A al hr.
Safety
MCF
w Instructions) 12. Other (see REC
0
13. TOTAL VOLUME MUM 8 -12) JUL 2 3 2007
9,874,896
Leese Use
MCF
14. ROL an Equivalent f .eta C.OIp1111Mi0A
t Ora
1.856,573
Conservation
MCF
,. OII
15. PIXCnassd gas Mdlonpa
0
Waste
MCF
18. TranaNnad from: FS1, FS2. FS3. GC1, GO GP
185,144,978
Dete
17. flingers b: (Ewes. es • negative to FS1, FS2, FS3. CCP 8 GPMA Pt.
McIntyre M1
- 175,270,081
it Remarks: Block 11: Fuel Gas = 2,056,661 mad and Assist Gas = 15.652 mscf; Block 17: Includes Ml Gas to Pt. McIntyre = 1,660,950 mscf
I hereby certify that the foregoing true and coned b the best of my knowledge.
Thee Manager, Production Taxes and Royalty
Note: All volumes must be
corrected to pressure of 14.65 pia
and to a temperature of 60o F.
Authority 20 AAC25.235.
Serrature O
MEW Name Bernard W. Hajny Phone (907)584-5028 Date 7- -0?
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Form 10-422 Rev. 1/2004
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
June 2007
[Unplanned Events Tess than or equal to 1 hour
DATE— TIME .,_ VOLUME DESCRIPTION OP INCIDENT & CAUSES. - ACTION TAKEN TO ELII INATE cast, ,.. -
6/16/2007 1100 - 1130 20 Not required for unplanned events which Not required for unplanned events which
6/16/2007
6/16/2007
6/16/2007
6/16/2007
6/16/2007
6/16/2007
6/16/2007
6/16/2007
6/18/2007
6/18/2007
6/20/2007
6/21/2007
6/22/2007
6/22/2007
6/22/2007
6/22/2007
6/22/2007
6/22/2007
6/22/2007
6/23/2007
6/23/2007
6/23/2007
6/24/2007
6/26/2007
6/30/2007
1115- 1130 387 are less than or equal to 1 hour are less than or equal to 1 hour
1245 -1305 1,830
1530-1620 1,549
1600 -1615 255
1600 -1615 255
1630 - 1645 328
2045 -2100 328
2255- 2320 500
1340 -1342 17
1520- 1530 64
2105 -2110 400
1133 -1147 117
1520- 1530 328
1542 -1552 327
1615 -1625 327
1655- 1705 387
1715- 1725 387
2145- 2155 387
2231- 2241 387
0721 -0729 101
0743 -0751 194
0840 -0849 213
2121 -2131 350
1352 -1402 350
1137 -1146 350
TOTAL 10,138
'Unplanned Events greater than 1 hour
VOLUME. DESCRIPTION OF INCIDENT 6 CAUSES ACTION TAKEN TO ELIMINATE CAUSE
6/1/2007 0940 -1124 635 See attachments See attachments
6/16/2007 1640-2140 7,744
TOTAL 8,379
1
'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE gi p TWE , VOLUME.. DESCRIPTION OF INCIDENT & CAUSE,, ACTION TAKEN TO ELIMINATE CANE
6/7/2007 2230 - 2240 190 See attachments See attachments
Pape 1
7/11/2007
2:24 PM
6/8/2007 0010 -0020
6/8/2007 0025 -0035
6/8/2007 0100 -0110
6/8/2007 0230-0330
6/8/2007 0250 -0310
6/8/2007 0300-0400
6/8/2007 0730 -0740
6/11 /2007 1653 -1715
6/14/2007 1444 -1450
6/15/2007 1517 -1522
6/19/2007 2151-2251
6/24/2007 0730 -0742
6/24/2007 1001 -1013
6/24/2007 1133 -1145
6/24/2007 1336 -1348
6/24/2007 1506 -1522
TOTAL
Unplanned Events c 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Not Purge
Assist
TOTAL FLARED VOLUME
190
190
190
1,220
387
350
240
675
328
59
700
275
285
280
85
280
5,924
(Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE ,„„, TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE - ACTION TAKEN TOELIWNATE
6/8- 19/2007 1200 -0600 7,208 See attachments See attachments
6/12/2007 0305-0430 1,575
TOTAL 8,783
Niii TOTAC
10,138
8,379
5,924
8,783
a
95.771
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FAC1LT/
GAS FLARING INCIDENT REPORT
June 2007
Page 2
7/11/2007
2:24 PM
Flare Start Date 6/1/2007
Flare End Date 8/30/2007
Report System
07 -213 Flare Relief
07 - 221 Flare Relief 8!7/2007 10:30:00 PM 10:40:00 PM 10 minutes No No Ves BP1 WAMACKCF 190
Determination Cause Tandem 01 (1883)shut due to rate cuts for FS - repairs
Normal stop sequence compete
Action Taken
07 -222 Flare Relief
07 -222 Flare Relief
07 -222 Flare Relief
07 -222 Flare Relief
Date Start Time Stop Time titration Black Smoke Intermittent Planned Reported By Volume (meet)
8/1/2007 9:40:00 AM 11:24:00 AM 104 minutes Yes No No BPI COOKAE 835
Nt Determination Cause T\C 1855 shutdown due to a problem associated with power dip in
stabilizer section from yesterday.
Action Taken
CGF Flare Report
Repaired equipment malfunction. restarted 1855 T/C and retumed
facility to /anal operation.
8/8/2007 12:10:00 AM 12:20:00 AM 10 minutes No No Yes BP1 VIAMACKCF 190
Determination Cause Tandem 2 (1883) shut down for FS -1 Repairs
Tandem completed stop sequence
Action Taken
8/8/2007 12:25:00 AM 12:35:00 AM 10 minutes No No Yes 8P1 WAMACKCF 190
Determination Cause Tandem 3 (1885) shut down for gas cut for FS-1 repairs
Completed shutdown sequence
Action Taken
8/8/2007 1:00:00 AM 1:10:00 AM 10 minutes No No Yes BPI'HAMACKCF 190
Determination Cause Shut down tandem M4 (1886) for FS -1 repairs
Completed shutdown sequence
Action Taken
8/8/2007 2:30:00 AM 3:30:00 AM BO minutes No No Ves 8P1VIAMACKCF 1220
Determination Cause Yard piping for LTS III blown down cor maintenance
Completed depressure
Action Taken
Report System
07-222 Flare Relief
07 -222 Flare Relief
07-222 Flare Relief
07 -222 Cm Blowdovm
07 -222 Other
07 -225 Other
CGF Flare Report
Date Start Time Stop Time Duration Black Smoke Intermittent Planned Reported By Volume (msct)
8/8/2007 2:50:00 AM 3:10:00 AM 20 minutes No No Yes BP1\HAMACKCF 387
Determination Cause Mi s1 (1805) shutdown for maintenance
completed sequence
Action Taken
8/8/2007 3:00:00 AM 4:00:00 AM 60 minutes No No Yes BP1 WAMACKCF 350
Determination Cause Booster 03 (1857)shut down for maintenance
Completed sequence
Action Taken
8/8/2007 7:30:00 AM 7:40:00 AM 10 minutes No No Yes BP1 HAMACKCF 240
Determination Cause Tandem *1 (1883) blown down from normal stop to Otrs for maintenance
completed depressure
Action Taken
N 4 8/8/2007 12:00:00 PM 3:00:00 PM 180 minutes No No Yes BP1\HAMACKCF 1000
Determination Cause Planned depressurization of LTS 3 feed gas piping from the F1 AV
valve to the F233V and F333V Chiller Derime valves inorder to
Action Taken establish a double block and bleed energy isolation on the line where a
blind is to be Installed. The blind protects workers on the Booster 3
repair project
\ Lines depressured to zero to establish double dock and beed.
\1 8/8/2007 3:00:00 PM 12:00:00 AM 540 minutes No No Yes BP1 WAMACKCF 333
Determination Cause This is venting event. The piping between 39FIAV and
39FV233/39FV333 Is vented to atmosphere to establish and double
Action Taken block and bleed protecting workers on the Booster 3 compressor repair.
This w* continue as long as the double block and bleed is
necessary.
- 8/9/2007 12:01:00 AM 11 PM 1438 minutes No No Yes BPItHAMACKCF 1000
Determination Cause This is venting event. The piping between 39F1AV and
39FV233/39FV333 is vented to atmosphere to establish and double
Action Taken dock and bleed protecting workers on the Booster 3 compressor repair
This 13 not entered on MTR 818 per K. Brad
This wilt continue as long as the double block and bleed is
necessary.
Report System
07.228 Other
07-227 Other
07.227 Other
07 -229 Other
07 Other
Date Start Time
8/10/2007 1201:00 AM 11:59:00 PM 1438 minutes
V Determination Cause
Action Taken
6/11/2007 12:01:00 AM 11:59:00 PM 1438 minutes No No Yes
\`• Determination Cause LThis is venting event The piping between 39F1 AV and 39FV233 &
39FV333 is vented to atmosphere to establish and double dock and
Action Taken bleed protecting workers on the Booster 3 compressor repair. This is
not entered on MTR 618 per K. Bra&
tThis will continue as long as the double block and bleed is
necessary. t
6/11/2007 4:53:00 PM 5:15:00 PM 22 minutes No No Yes
Determination Cause Depressure LTS for Repairs
Completed 1st pert of blow down.
Action Taken
�r 6/12/2007 12:01:00 AM 11:59:00 PM 1438 minutes No No Yes
Determination Cause
Action Taken
Al 6/12/2007 3:05:00 AM
Determination Cause
Action Taken
CGF Flare Report
Stop Time Duration Black Smoke Intermittent Planned
No No Yes
LThis is venting event. The piping between 39FIAV and 39FV233 &
39FV333 is vented to atmosphere to establish and double block and
bleed !fleeting workers on the Booster 3 compressor repair. This is
not entered on MTR 618 per K. BraN. L
LThis will continue as long as the double dock and bleed Is
necessary. t
This is venting event The piping between 39F1 AV and 39FV233 &
39FV333 is vented to atmosphere to establish and double block and
bleed protecting workers on the Booster 3 compressor repair. This is
not entered on MTR 618 per K. BralI.
This will continue as long as the double block and bleed Is
necessary.
4:30:00 AM 85 minutes No No Yes
Completion of LTS 111 depressure for repairs
Completed depressure of vessel.
Reported By Volume (mscf)
BP1VHAMACKCF 1000
BP1VIAMACKCF 1000
BP1ViAMACKCF 875
BP1V 1000
BP1VIAMACKCF 1575
CGF Flare Report
Report System Date Start Time Stop Time Duration Bieck Smoke Intermittent Planned Reported By Volume (mscf)
07 -233 Other 6/13/2007 12:00:00 AM 11:59:00 PM 1439 minutes No No Yes BPIUAYJM 300
\-. Determination Cause This is venting event The piping between 39F1AV and 39FV233 &
39FV333 is vented to atmosphere to establish and double block and
Action Taken bleed protecting workers on the Booster 3 compressor repair. This is
not entered on MTR 618 per K. Brat.
07 -234 Other
07-234 Other
07-235 Other
07-235 Ctrl Blowdown
This will continue until Booster -3 work is compete- Energy Iso.
6/14/2007 12:01:00 AM 11:59:00 PM 1438 minutes No No Ves BPIUAYJM 300
V Determination Cause This Is venting event. The piping between 39F1AV and 39FV233 &
39FV333 is vented to atmosphere to establish and double block and
Action Taken bleed protecting workers on the Booster 3 compressor repair. This is
not entered on MTR 618 per K. Bred.
This ea continue until Booster 3 work is completed. Energy Isolation
6/14/2007 2:44:00 PM 2:50:00 PM 8 minutes Yes No Yes BP1UAYJM 328
Determination Cause T\C 1855 shutdown tor planned maintenance
1855 T/C depressurization to 180 pslg completed.
Action Taken
6/15/2007 12:01:00 AM 11:59:00 PM 1438 minutes No No Ves
V Determination Cause This S venting event The piping between 39F1 AV and 39FV233 &
39FV333 is vented to atmosphere to establish and double block and
Action Taken bleed protecting workers on the Booster 3 compressor repair. This is
not entered on MTR 618 per K. Breit.
This will remain this way until Booster 3 work is completed.Energy
Ise
6/15/2007 3:17:00 PM 3:22:00 PM 5 minutes No No Ves
Determination Cause INC 1855 was shutdown on 6//14/2007. 180 prig was left on the
compressor. Blew down 1855 for maintenance.
Action Taken
1855 T/C depressurized from 180 peig to 0 peig
BPIUAYJM 300
BPIUAYJM 59
Report System
07-239 CM Slowdown
07-239 Flare Relief
07-242 Col Slowdown
07 -243 Ctrl Blowdown
07.247 Ctrl Slowdown
CGF Flare Report
Date Start Time Stop Time Duration Black Smoke Intermittent Planned Reported By Volume (mscf)
6/16/2007 12:01 AM 11:59:00 PM 1438 minutes No No Ves BP1 VAYJM 300
�) Determination Cause This is venting event. The piping between 39F1AV and 39FV233 &
39FV333 S vented to atmosphere to establish and double dock and
Action Taken deed protecting workers on the Booster 3 compressor repair. This is
not entered on MTR 618 per K. Brae.
This vAll remain until Booster 3 comes up. Energy Iso
8/16/2007 4:40:00 PM 9:40:00 PM 300 minutes Yes No No BP11JAVJM 7744
Xl Determination Cause T/C 1805 shutdown due to Stabilizer Station SESD. Stabilizer
Overhead gas intemnittenly going to Bare while Operations attempting
Action Taken to mitigate plantwlde problems.
TIC 1805 Started and loaded.
6/17/2007 12:01:00 AM 11:59:00 PM 1438 minutes Ves No Ves
\-J Determination Cause This is venting event. The piping between 39F1AV and 39FV233 &
39FV333 is vented to atmosphere to establish and double dock and
Action Taken bleed protecting workers on the Booster 3 compressor repair. This is
not entered on MTR 618 per K. Breit
This will remain until Booster 3 is put In service. Energy Iso
8/18/2007 12:01:00 AM 11:59:00 PM 1438 minutes Ves No Ves
Ni Determination Cause This is venting event. The piping between 39F1AV and 39FV233 &
39FV333 is vented to atmosphere to establish and double dock and
Action Taken bleed protecting workers on the Booster 3 compressor repair. This is
not entered on MTR 618 per K. Brae.
This will remain and Booster 3 returns to service.Energy Iso
6/19/2007 12:00:00 AM 6:00:00 AM 360 minutes No No Ves BP1I,DRANTIDE 75
Determination Cause This is a venting event. The piping between 39F1 AV and 39FV233 &
39FV333 is vented to atmosphere to establish and double dock and
Action Taken bleed protecting workers on the Booster 3 compressor repair. This is
not entered on MTR 818 per K. Brea. (entered by li Tucker, 8/22)
Close bleed line and end venting during plant safe in process.
entered by 11 Tucker, 822)
BPhJAYJM 300
BP11JAYJM 300
CGF Flare Report
Report System Date Start Time Stop Time Duration Black Smoke Intermittent Planned Reported By Volume (mscf)
07 -247 Ctn Slowdown 8119/2007 9:51:00 PM 10:51:00 PM 80 minutes No No Yes BP1\GRAN11DE 700
07-259 Ctrl Slowdown
Determination Cause Competed installation of new valves for Booster 3 and Valve
maintenance on 15204 PAP In LTS 3.
Action Taken
Action Taken
Depressured system from 100 psig to 0 prig,
07-259 GUI Slowdown 824/2007 7:30:00 AM 7:42:00 AM 12 minutes No No Ves BPI\GRANTIDE 275
Determination Cause T/C 1857 BESD activation after penned maintenance for testing
systems.
Action Taken
Depressurization competed.
07-259 Ctrl Slowdown 824/2007 10:01:00 AM 10:13:00 AM 12 minutes No No Ves BPI\GRANTIDE 285
Determination Cause T/C 1857 BESD activation after planned maintenance for testing
systems.
Action Taken
Depressurization competed.
07 -259 Ctd Slowdown 824/2007 11S3:00 AM 11:45:00 AM 12 minutes No No Ves BP11GRANTIDE 280
Determination Cause T/C 1857 BESD activation after panned maintenance for testing
systems.
Action Taken
Depressurization completed.
07 -259 Ctd Slowdown 824/2007 1:38:00 PM 1:48:00 PM 12 minutes No No Ves BPI\GRANTIDE 85
Determination Cause T/C 1857 BESD activation after gamed maintenance for testing
systems.
Action Taken
Depressurization competed.
8/242007 3:08:00 PM 3:22:00 PM 18 minutes No No Ves BP1 \GRANTIDE 280
Determination Cause T/C 1857 BESD activation after panned maintenance for testing
systems.
Depressurization competed.
Subject: GPB Gas Flaring Incident
From: "GPB, Prod Opt TL" <GPBProdOptTL @BP.com>
Date: Mon, 18 Jun 2007 14:36:05 -0800
To: steve_mcmains @admin.state.ak.us
CC: "GPB, Environ TL" <GPBEnvironTL@BP.com >, "GPB, Environ Advisor East"
<GPBEnvironAdvisorEast @BP.com >, "Fiedler, Anne M" <Anne.Fiedler @bp.com >, "Benson, Gary
A" <Gary.Benson @bp.com >, "Pfeiffer, Jim A" <fim.Pfeiffer@bp.com>, "Kurz, John"
<john.kurz @bp.com >, "GPB, Gas Plants OTL" <GPBGasPlantsOTL @bp.com >, "GPB, Area Mgr
North (Gas Plants/GPMA)" <GPB_AreaMgrNorth@BP.com>
To: Steve McMains, AOGCC
stave mcmains @admin.state.ak.us
907 - 793 -1241, fax 907 - 276 -7542
From: Hal Tucker, GPB Prod Optimization Team Leader
An extended flaring event occurred at CGF oh June 16. This event was
initiated by a vibration monitor malfunction Which ultimately resulted in
turbine /compressor 1805 shutting down and then cascaded into a full plant
upset. The actual extended flaring event occurred during the restart process.
Intermittent flaring occurred over a 5 hour time frame while operations dealt
with plant wide problems. Flaring stopped at 21:40 when 1805 was restarted
and successfully loaded. Intermittent flaring occurred from 16:30 to 21:40 (310
minutes), total volume flared for the extended event was 8400 MSCF.
If you require additional information, please don't hesitate to call me.
Hal Tucker
GPB Prod Optimization Team Leader
(907) 659-4472
1 of i 6/19/2007 7:33 AM
Subject: GPB Gas Flaring and Venting Event
From: "GPB, Prod Opt TL" <GPBProdOptTL @BP.com>
Date: Fri, 22 Jun 2007 17:39:01 -0800
To: steve _mcrnains@admin.state.ak.us
CC: "GPB, Environ TL" <GPBEnvironTL @BP.com>, "GPB, Environ Advisor East"
<GPBEnvironAdvisorEast@BP.com>, "Fiedler, Anne M" <Anne.Fiedler c@i bp.com >, 'Benson, Gary
A" <Gary.Benson@bp.com>, "Pfeiffer, Jim A" Uun.Pfeiffer @bp.com>, "Kurz, John"
<john.kurz@bp.com >, "GPB, Area Mgr North (Gas Plants/GPMA)"
<GPB_AreaMgrNorth@BP.com>, "GPB, Gas Plants OTL" <GPBGasPlantsOTL @bp.com >, "GPB,
Optimization Engr" <GPBOptimizationEngr @BP.com>
To: Steve McMains, AOGCC
steve mcmains @admin.state.ak.us
907- 793 -1241, fax 907 -276 -754
From: Hal Tucker, GPB Prod Optimization Team Leader
This is a follow up report on the flaring and venting that took place at
the Central Gas Facility OMMI .taring a planned maintenance event. The
original email is attached for your reference.
CGF completed their planned maintenance activity to replace a 48" and a
60" valve on June 19. As part of the depressurization and safe -out of
the portion of the plant being worked on, several machines were taken
down and de- pressured to 0 psi. For the duration of the maintenance
activity, a double block and bleed was set up as part of the safe out
for worker protection. The bleed was open to atmosphere continuously
until approximately 06:00 on June 19 when the bleed line was closed
during the safe in process. Four days into the event, additional work
was performed on several valves that were part of the safe out. This
resulted in vented gas volumes being reduced from approximately 1000
MSCFD to 300 MSCFD.
The following summary is for flaring and venting relating to the planned
event, only. Other flaring that occurred during this event, but was not
related to it, has been reported separately if it exceeded one hour in
duration, or 5000 MSCF in volume. If the events unrelated to the planned
maintenance did not meet either the one hour or the 5000 MSCF
thresholds, they will be reported separately on the monthly gas
disposition report.
6/8 depressure for safe out, flare duration 11 hours
intermittent, volume 3767 MSCF
6/8 INITIATE double block and bleed for worker protection,
vent to atmosphere, duration 9 hours, volume 333 MSCF
6/9 double block and bleed, vent to atmosphere, duration 24
hours, volume 1000 MSCF
6/10 double block and bleed, vent to atmosphere, duration 24 hours,
volume 1000 MSCF
6/11 double block and bleed, vent to atmosphere, duration 24 hours,
volume 1000 MSCF
6/11 depressure LTS3 for repairs, flare duration 22 minutes, volume
675 MSCF
6/12 double block and bleed, vent to atmosphere, duration 24 hours,
volume 1000 MSCF
6/12 complete depressure of LTS3 for repairs, flare duration 85
minutes, volume 1575 MSCF
6/13 double block and bleed, vent to atmosphere, duration 24 hours,
volume 300 MSCF
1 of 4 6/25/2007 8:08 AM
6/14 double block and bleed, vent to atmosphere, duration 24 hours,
volume 300 MSCF
6/14 depressure turbine compressor 1855 to 180 psi for repairs, flare
duration 6 minutes, volume 328 MSCF
6/15 double block and bleed, vent to atmosphere, duration 24 hours,
volume 300 MSCF
6/15 complete depressure of turbine compressor 1855 to 0 psi for
repairs, flare duration 5 minutes, volume 59 MSCF
6/16 double block and bleed, vent to atmosphere, duration 24 hours,
volume 300 MSCF
6/17 double block and bleed, vent to atmosphere, duration 24 hours,
volume 300 MSCF
6/18 double block and bleed, vent to atmosphere, duration 24 hours,
volume 300 MSCF
6/19 depressure of booster 1857 to 0 psi for new valve installation,
flare duration 60 minutes, volume 700 MSCF
6/19 END double block and bleed during safe in process at
approximately 06:00, vent to atmosphere, duration 6 hours, volume 75
MSCF - EVENT ENDED
Tot #1 duration of the planned event 11 days and 3 hours; total volume
flared, 7104 MSCt; total volume vented. 6208 MSCF.
If you require additional information, please don't hesitate to call me.
Hal Tucker
GPB Prod Optimization Team Leader
(907) 659 -4472
From: GPB, Optimization Engr
Sent: Saturday, June 09, 2007 9:19 PM
To: 'steve mcmains @admin.state.ak.us'
Cc: GPB, Prod Opt TL; GPB, Environ TL; GPB, Environ Advisor East;
Fiedler, Anne M: Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB,
Area Mgr East (FS1 /2 /COTU /Seawater); GPB, Area Mgr North (Gas
Plants /GPMA); GPB, Gas Plants OTL: GPB, FS1 OTL
Subject: GPB Gas Flaring and Venting Incident
To: Steve McMains, AOGCC
steve mcmains @admin.state.ak.us
907 - 793 -1241, fax 907 - 276 -7542
From: Beverly Luedke -Chan, GPB Field Optimization Engineer for
Hal Tucker / Dwight Warner, GPB Prod Optimization Team
Leader
Planned flaring and venting occurred June 7 -8 at Greater Prudhoe Bay.
CGF has a planned maintenance activity that is scheduled to last for a
minimum of 14 days, to replace a 48" and a 60" valve. As part of the
depressurization and safe -out of the portion of the plant being worked
on, several machines were taken down and depressured to 0 psi. In
conjuction with this work, FS1 was taken down to replace some flare
piping and also had to be depressured.
On 6/7, CGF flfared 190 MSCF when Tandem #1 (1883) was shut down to
accommodate rate cuts for FS1 flare piping. 10:30 pm - 10:40 pm (10
min).
On 6/8; FSl4.14ared for a total of 480 minutes from 8:30 am to 4:30 pm
in order to depressure the plan, drillsites and common lines to work
on the flare knockout piping. Once depressurization was completed all
2 d4 6/25/2007 8:08 AM
YY.asb teams • tams/is YYY1141.
flare valves were closed. Total volume flared was 6181 MSCF.
On 6/8, CGF flared a total volume of 2770 MSCF and vented a total
volume of 333 MSCF while taking down several machines and
depressurizing them for planned maintenance. The following is a
summary of times and volumes...
Flaring:
12:10 am -12:20 am (10 min) 190 MSCF when Tandem 02 (1884) was taken
down and depressured.
12:25 am -12:35 am (10 min) 190 MSCF when Tandem 03 (1885) was taken
down and depressured.
1:00 am - 1:10 am (10 min) 190 MSCF when Tandem 04 (1886) was taken
down and depressured.
2:30 am - 3:30 am (60 min) 1220 MSCF when yard piping for LTS III was
blown down for maintenance.
2:50 am - 3:10 am (20 min) 387 MSCF when MI 01 (1805) was taken down
and depressured.
3:00 am - 4 :00 am (60 min) 350 MSCF when Booster 03 (1857) was taken
down and depressured.
7:30 am - 7:40 am (10 min) 240 MSCF when Tandem 01 (1883) was blown
down to 0 psi for maintenace (previously shut -in).
12:00 pm - 3:00 pm (180 min) 2 MSCF when LTS III feed gas piping was
depressured while establishing a double block and bleed energy
isolation in order to install a blind.
Venting:
3:00 pm - 12:00 am (540 min) 333 MSCF was vented. The piping between
39F1AV and 39FV233/39FV333 was vented to atmosphere to establish a
double block and bleed protecting workers on the Booster 3 compressor
repair.
Please note that the above venting will continue at up to 1000 MSCF
each day while the repairs are ongoing in order to protect personnel
working on the compressor. The planned duration is approximately 14
days. An update will be sent next week and then a final e-mail will
be sent at the completion of the CGF maintenance program.
Summary of volumes...
6/7 - 190 MSCF at CGF flared (10 min)
6/8 - 6181 MSCF at FS1 flared (480 min)
6/8 - 2770 MSCF at CGF flared (360 min)
6/8 - 333 MSCF at CGF vented (540 min)
If you require additional information, please don't hesitate to call
me.
Beverly Luedke -Chan
GPB Field Optimization Engineer
(907) 659 -4382
for
Hal Tucker and Dwight Warner
GPB Prod Optimization Team Leader
(907) 659 -4472
winmaiLdat Content -Type: applcation/ms -tnef
Content - Encoding: base64
3. cif 4 6/25/2007 8:08 AM
1 of 2
Subject: GPB Gas Flaring and Venting Incident
From: "GPB, Optimization Engr" <GPBOptimizationEngr @BP.com>
Date: Sat, 09 Jun 2007 21:19:25 -0800
To: steve_mcmains @admin.state.ak.us
CC: "GPB, Prod Opt TL" <GPBProdOptTL @BP.com>, "GPB, Environ TL"
<GPBEnvironTL @BP.com >, "GPB, Environ Advisor East' <GPBEnvironAdvisorEast @BP.com >,
"Fiedler, Anne M" <Anne.Fiedler @bp.com >, "Benson, Gary A" <Gary. Benson @bp.com >, "Pfeiffer,
Jim A" cJim.Pfeiffer @bp.com>, "Kurz, John" <john.kurz @bp.com >, "GPB, Area Mgr East
(FS1 /2/COTU /Seawater)" <GPBAreaMgrEastFS12CS @BP com >, "GPB, Area Mgr North (Gas
Plants/GPMA)" <GPB_AreaMgrNorth@BP.com >, "GPB, Gas Plants OTL"
<GPBGasPlantsOTL @bp.com >, "GPB, FS! OTL" <GPBFSIOTL @bp.com>
To: Steve McMains, AOGCC
steve_mcmains@admin.state.ak. us
907- 793 -1241, fax 907- 276 -7542
From: Beverly Luedke-Chaq GPB Field Optimization Engineer for
Hal Tucker / Dwight Warner, GPB Prod Optimization Team Leader
Planned flaring and venting occurred June 7 -8 at Greater Prudhoe Bay.
CGF has a planned maintenance activity that is scheduled to last for a minimum of 14 days, to replace a
48" and a 60" valve. As part of the depressurization and safe -out of the portion of the plant being
worked on, several machines were taken down and depressured to 0 psi. In conjuction with this work,
FS1 was taken down to replace some flare piping and also had to be depressured.
On 6/7, CGF flared 190 MSCF when Tandem #1 (1883) was shut down to accommodate rate cuts for
FS1 flare piping. 10:30 pm - 10:40 pm (10 min).
On 6/8, FS1 flared for a total of 480 minutes from 8:30 am to 4:30 pm in order to depressure the plan,
drillsites and common lines to work on the flare knockout piping. Once depressurization was completed
all flare valves were closed. Total volume flared was 6181 MSCF.
On 6/8, CGF flared a total volume of 2770 MSCF and vented a total volume of 333 MSCF while taking
down several machines and depressurizing them for planned maintenance The following is a summary
of times and volumes...
Flaring:
12:10 am -12:20 am (10 min) 190 MSCF when Tandem #2 (1884) was taken down and depressured.
12:25 am -12:35 am (10 min) 190 MSCF when Tandem #3 (1885) was taken down and depressured.
1:00 am - 1:10 am (10 min) 190 MSCF when Tandem #4 (1886) was taken down and depressured.
2:30 am - 3:30 am (60 min) 1220 MSCF when yard piping for LTS III was blown down for maintenance.
2:50 am - 3:10 am (20 min) 387 MSCF when MI #1 (1805) was taken down and depressured.
3:00 am - 4:00 am (60 min) 350 MSCF when Booster #3 (1857) was taken down and depressured.
7:30 am - 7:40 am (10 min) 240 MSCF when Tandem #1 (1883) was blown down to 0 psi for
maintenace (previously shut -in).
12:00 pm - 3:00 pm (180 min) 2 MSCF when LTS HI feed gas piping was depressured while establishing
a double block and bleed energy isolation in order to install a blind.
Venting:
6'11/20077:16 AM
for
3:00 pm - 12:00 am (540 min) 333 MSCF was vented. The piping between 39F1AV and
39FV233/39FV333 was vented to atmosphere to establish a double block and bleed protecting workers
on the Booster 3 compressor repair.
Please note that the above venting will continue at up to 1000 MSCF each day while the repairs are
ongoing in order to protect personnel working on the compressor. The planned duration is
approximately 14 days. An update will be sent next week and then a final e-mail will be sent at the
completion of the CGF maintenance program.
Summary of volumes...
6/7 -190 MSCF at CGF flared (10 min)
6/8 - 6181 MSCF at FS1 flared (480 min)
6/8 - 2770 MSCF at CGF flared (360 min)
6/8 - 333 MSCF at CGF vented (540 min)
If you require additional information, please don't hesitate to call me.
Beverly Luedke -Chan
GPB Field Optimization Engineer
(907) 659 -4382
Hal Tucker and Dwight Wamer
GPB Prod Optimization Team Leader
(907) 659-4472
2 of 2 6/11/2007 7:16 AM
7/30/2007
McMains, Stephen E (DOA)
From: Benson, Gary A [Gary.Benson @bp.com]
Sent: Saturday, July 28, 2007 1:41 PM
To: McMains, Stephen E (DOA)
Subject: RE: PBU CGF Gas Disposition - June 2007
Hi Steve,
Page 1 of 1
The June CGF Assist and Pilot Purge volumes are reversed......the correct Pilot Purge volume is 15,652 mcf and
the correct Assist Gas volume is 46,895 mcf. 111 get a corrected CGF 10-422 report to you on Monday.
Sorry for the mixup.
Gary
From: McMains, Stephen E (DOA) [ mailto :steve.mcmains @alaska.gov]
Sent: Friday, July 27, 2007 8:21 AM
To: Benson, Gary A
Subject: PBU CGF Gas Disposition
Gary, The CGF gas facility for the month of June pilot purge flare volume of 46,895 mcf is more than doubled
for the normal operations of the facility. We need an explanation of the events for this gas volume increase for
for flared gas of less than 1 hour. A quick response is requested to close out this event, thanks.
Steve McMains
Statistical Technician
Alaska 00 & Gas Conservation Commission
333 W. 7th Ave. Suite 100
Anchorage, Alaska 99501
ph: 907.793.1241
fax: 907.276.7542
1 Facility Number
0290000008
2 Facility Name
PBU CGF B
3 Fund
PBU - EOA
4 Operator
BP
5 Mont/Year of Disposition
July -2007
Disposition
Volume MCF
20. For productnn from multiple pools, list Contnbuboa of each pod as a percent of
Total Volume
6. Sold
1,798,003
Pool Name
Pool Code
Percent
7. Reinjected
7.883,610
PRUDHOE
640150
100.00%
8. Flared or vented 1 Hour or less
3.100
9 Flared or vented more Man 1 tow (see nstr 4
0
10. Pilot and Purge
17.184
11. Used for lease operator (specify in Remarks)
2,881,575
12. Omer (see rtructions)
i
0
Official Use Only
Authorization >1 hr.
Safe H
MCF
13. TOTAL. VOLUME (ITEMS 6-12)
12,583,472
Lease Use
MCF
14 NGL Gas Equivalent
1,798,003
Conservation
MCF
15. Purchased gas
0
Waste
MCF
16. Transferred from FS1. FS2.
FS3. GC1 GC2 0c3
208,854.837
Commissioner Date
17 Transferred to. (Express as a reganve e) FS1, FS2. FS3. CCP 8 GPMA PL
Mcintyre MI
- 196,271.364
18. Remarks. Block I I. Fuel Gas = 2.832.404 nt.ct awl \atst Gs = 49, I nisd. Gluck 17: In.ludc. MI Gas to Pl. !McIntyre = 4.584,712 nts i
I hereby certify that the foregoing is the and correct to the best of knoaiWge.
y1 _
Si9nafure r `Y1 ritk Manager, Production Taxes nil Royalty
Note: All volumes 4 be
corrected to prressure ssure of f 1 14.. 65 5 pale
and to a temperature of 600 F.
Authority 20 AAC25.235.
R
Pnnre Bemard Name emard W. Hdjny Phone (907)564.502s Dare O /
Form 10 -422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
7/2/2007 1205 -1215 190 Not required for unplanned events which
7/2/2007 0305 -0310 240 are less than or equal to 1 hour
7/12/2007 1210 -1220 350
7/12/2007 0410 -0420 350
7/13/2007 1630 -1645 430
7/17/2007 1215 -1230 328
7/17/2007 1308 -1320 20
7/17/2007 1400 -1412 20
7/19/2007 1100 - 1110 50
7/19/2007 1700-1710 50
7/20/2007 1310 - 1320 50
7/21/2007 0410 -0420 110
7/30/2007 0330-0340 430
7/30/2007 0703 -0745 52
7/31/2007 2150 -2200 430
TOTAL
DATE
DATE
DATE
TIME
TOTAL
TIME
TOTAL
TIME
TOTAL
3,100
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
July 2007
`Unplanned Events greater than 1 hour
VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
0
0
See attachments
!Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
1
VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
1
!Planned Events Exceeding 1 Hour OR Exceeding 5000 Mct
VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
0
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Page 1
8/21/2007
4:10 PM
TOTAL
Unplanned Events < 1 Hour 3.100
Unplanned Events > 1 Hour 0
Planned Events < 1 hour and not 0
exceeding 5,000 MCF
Planned Events > 1 hour or 0
exceeding 5,000 MCF
Pilot Purge 17,184
Assist 49,171
TOTAL FLARED VOLUME 69,455
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
July 2007
Page 2
8/21/2007
4:10 PM
1 Facility Number
0290000008
2 FaS.ty Name
PBU CGF B
3 Field
PBU - EOA
4 Operator
BP
5 MonitWear of Deposition
Auqusl -2007
Disposition
Volume MCF
20. For production from multiple pools, list cons button ot each pool as a percent of
Total Volume.
6. Sob
1,562,654
Pool Name
Pool Code
Percent
7. Reinjected
6.109,811
PRUDHOE
640150
100.00%
8. Flared or vented lour or less
3.906
9 Flared or vented more even 1 hour (see matt )
6.114 r ✓
10. Paot and Purge
16,738
11. Used for lease operators (specify in Remarks)
2,968.929
12. Omer (see instructions)
0
Official Use Only
Aulhon23tion >1 h[
Safety
6/1(4'-
MCF
13. TOTAL VOLUME(ITEMS6 -12)
10,668,152
Lease Use
MCF
14. NGL Gas Equivalent
1,562,654
Conservation
MCF
15. Purchased gas
0
Waste
MCF
16. Transferred haw F51. F52, F53. GCE GC2, GC3
205,741,600
- 195,073.448
i0 - i7 -o
Imo lo Date
17 Transferred to (Express as a negative a) FSI. F52. FS3. CCP d GPMA PI.
McIntyre MI
18. Remarks: Block 1 I: Fuel Gas = 2.915.206 ruse(and Aasat Gas = 53,633 mid; Block 17: Includes bll Gas to Pt. McIntyre = 1.476.317 abet
I hereby certify mat the f • regourg is tr - tort to the best of my knowledge
Gf ( /
Signature - Silas T1tle Manager, Production Taxes and Royalty
Note: All volumes must be
corrected to pressure of 14.65 psia
and
Authority a hority temperature 20 AAA 25.235. F.
ity AC5.
•
Printed Name Bernard W. Hajny Phone (907)564-5028 Date G
/ �7 �7
f
Form 10-422 Rev. 1 /2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
1
'Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
8/1/2007 1620 -1637 190 Not required for unplanned events which
8/11/2007 1445 -1450 328 are less than or equal to 1 hour
8/11/2007 1710 -1720 400
TOTAL
1
'Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
8113/2007 0118 -1348
TOTAL
1
`Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
8/25/2007 0145 -0155 328 See attachments
8/25/2007 1535 -1605 2,660
TOTAL
1
'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
DATE
TIME
TOTAL
918
6,114
2,988
0
TOTAL
Unplanned Events c 1 Hour 918
Unplanned Events > 1 Hour 6.114
Planned Events c 1 hour and not 2,988
exceeding 5,000 MCF
Planned Events > 1 hour or 0
exceeding 5,000 MCF
Pilot Purge 16,738
Assist 53,633
TOTAL FLARED VOLUME 80,391
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
August 2007
6,114 See attachments
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Page 1
9/12/2007
9 AM
Flare Start Date 8/112007
Flare End Date 8/31/2007
Report System
07-331 Flare Relief
07 -344 Flare Relief
07-344 Flare Relief
CGF Flare Report
Date Start Time Stop Time Duration Black Smoke Intermittent Planned Reported By Volume (mscf)
8/13/2007 1:18:00 AM 1:48:00 PM 750 minutes Ves Ves No BP1\MURRIEMA 6114
Determination Cause Nine of the CGF T/C's shut down due to contol failure associated with
CPS power ground fault failure. The above time shows a total time
duration that the intermittent and black smoke events tool place. The
Action Taken actual Lane of the black smoke events were 0545 to 0558 = 13, 0603 to
0609 = 6 mins, 0619 to 0623 = 4 mins, 0643 to 0652 = 9 mine, 0658 to
0702 = 4 mins, 0710 to 0717 = 7 mins, 0720 to 730 = I0 mins, 0743 to
0747 = 4 mins, 0749 to 0758 = 9 mins, 0823 to 0930 = 67 mins. The
total time of black snake events equals 133 minutes. During a CGF
plant shut down flaring of the propane system is required to stabilize
the refrigeration system vessel levels before a restart can be initiated.
Completed trouble shooting the power outage. reloaded T /C's at
CGF, and stabilized the facility process operation. The CGF
remained on emergency generator power for several hours while
CPS completed trouble shooting of the main power gird for ground
faults. The CPS power was secured, and CGF returned to CPS
power.
8/25/2007 1.45:00 AM 1:55:00 AM 10 minutes No No
Determination Cause 1805 shutdown not needed during taps outage.
Action Taken competed shutdown
Ves
BPIWAMACKCF 328
8/25/2007 3 PM 4:05:00 PM 30 minutes No No Ves 8P1 \HAMACKCF 2660
Determination Cause Blew down LTS M1 to opsi for planned repairs
Action Taken Competed (lowdown.
McMains, Stephen E (DOA)
From: GPB, Prod Opt TL [GPBProdOptTL@BP.com)
Sent: Wednesday, August 15, 2007 3:24 PM
To: McMains, Stephen E (DOA)
Cc: GPB, Environ TL; GPB, Environ Advisor East; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim
A; Kurz, John; GPB, Area Mgr North (Gas Plants /GPMA); GPB, Gas Plants OTL
Subject: GPB Gas Flaring Event
To: Steve McMains, AOGCC
steve_mcmains@admin.state.ak.us
907 -793 -1241, fax 907- 276 -7542
From: Hal Tucker, GPB Production Optimization Team Leader
An extended flaring event occurred at CGF on August 13. Flaring occurred when the entire plant
unexpectedly shut down due to a power interruption. The power interruption appears to have been
related to a ground fault problem associated with CPS. During a full plant shut down at CGF, flaring off
the propane system is required to stabilize the refrigeration system vessel level before a restart can be
initiated. CGF flared intermittently for 750 minutes, with a total volume of 6,077 MSCF.
If you require additional information, please don't hesitate to call me.
Hal Tucker
GPB Production Optimization TL
(907) 659 -4472
1
1 Facility Number 12 . Facility Name
0290000008 PBU CGF B
3 Field
PBU - EOA
a. Operator
IBP
5. Month/Veer of Disposition
September - 2007
Disposition
Volume MCF
20. For production from multiple pools. list contribution of each pad as a percent ol
Total Volume.
8. Sold
1,654,728
Poor Name
Pod Code
Percent
7 . Reinjected
5,520,615
PRUDHOE
640150
100.00%
8 Flared or vented 1 hour or leas
9,251
9 Flared or vented inns than 1 hour (see instr.)
0
10 Piot and Purge
15,645
11. Used for lease operations (specify in Remarks)
2,740,543
12 Omer (see instructions)
0
., Official Use Only
Authorization >1 hr
Safety
MCF
13. TOTAL VOLUME (ITEMS &12)
9,940,782
Lease Use
MCF
14. NGL Gas Equivalent
1,654,728
Conservation
MCF
15. Purchased gas
0
Wass
MCF
16. Transferred from: FS1, F52, FS3, GCI, GC2, Cab
198,608,135
Commissioner Dab
17. Transferred te. (Express as a negative 0) F51, F52, F53. CCP & GPMA Pt.
McIntyre MI
- 188,667,354
18. Remarks. Block 11: Fuel Gas = 2,687.353 mscf and Assiut Gas = 53390 msct; Block 17. Includes MI Gas to Pt. McIntyre = 1,790,895 mscf
I hereby certify that me foregoing is true and correct to the best of my knowledge.
Note: All volumes
Signature j
�_/
must be
"..a-L- 1 \3 Title Manager, Production Taxes and Royalty
corrected 10 14.65
Panted Name Bernard W. ajny Phone (907)564 -5028 Date
G '
pressure of psla
a nd to a temperature of 60o F.
Authority 20 AAC25 935.
Form 10-422 Rev. 1 /2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
1
(Unplanned Events less than or equal to 1 hour
- DATE - TIME _ VOLUME DESCRIPTION OF INCIDENT & CAUSE . ACTION TAKEN TO ELIMINATE CAUSE
9/3/2007 1515 -1555 7,500 Not required for unplanned events which Not required for unplanned events which
9/16/2007 2105 -2118 195 are less than or equal to 1 hour are less than or equal to 1 hour
TOTAL
7,695
1
'Unplanned Events greater than 1 hour
TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL
DATE
1
'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME -. VOLUME DESCRIPTION OF INCIDENT & CAUSE
9/8/2007 2210 -2223 328 See attachments
9/9/2007 1558 -1615 328
9/15/2007 0255 -0305 390
9/15/2007 0745 -0755 120
9/16/2007 1910 -1921 195
9/16/2007 2055 -2107 195
TOTAL
'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
1
DATE
TIME
TOTAL
VOLUME
0
1,556
0
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
September 2007
DESCRIPTION OF INCIDENT & CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Page 1
TOTAL
Unplanned Events • 1 Hour 7,695
Unplanned Events > 1 Hour 0
Planned Events • 1 hour and not 1,558
exceeding 5,000 MCF
Planned Events > 1 hour or 0
exceeding 5,000 MCF
Pilot Purge 15,645
Assist 53,190
TOTAL FLARED VOLUME 78 10/11/2007
9:08 AM
Flare Start Date 9/1/2007
Flare End Date 9/30/2007
Time Of Flaring
CGF Flare Report
Report System Date Start Time Stop Time Duration Intermit'nt Bik Smoke Planned Reported By Volume (MSCF)
07 -375 Flare Relief 9/8/2007 10:10:00 PM 10:23:00 PM 13 minutes No No Yes BP1 \YOUNGBDV 328
Determination Cause SD T/C 1805 for Maim.
Action Taken Completed Slowdown
07 -378 Cirl'd Slowdown 9/9/2007 3:58:00 PM 4:15:00 PM 17 minutes No No Ves BP1 \VOUNGBDV 328
Determination Cause SD T/C 1855 NOT NEEDED DUE TO HIGH AMBIENT
Action Taken COMPLETED SLOWDOWN
07 -388 CtrI'd Blowdown 9/15/2007 2:55:00 AM 3:05:00 AM 10 minutes No No Ves SP 1\MURRIEMA 390
Determination Cause T/C 1801 and 1802 shut down for planned maintenance.
Action Taken Skids completed blowdowns to 180 psi each.
07 -388 Cm'd Slowdown 9/15/2007 7:45:00 AM 755 AM 10 minutes No No Yes BP1 \MURRIEMA 120
Determination Cause T/C 1801 and 1802 BESO to depressure completely for planned
maintenance.
Action Taken
Skids completed dowdowns to 0 psi.
07-390 Ctd'd Blowdown 9/16/2007 7:10:00 PM 7.21:00 PM 11 minutes No No Yes BP1 \YOUNGBDV 195
Determination Cause SD PC 1801 TO FIX OIL LEAK
Action Taken SLOWDOWN COMPLETED
07 - 390 Ctrl'd Blowdown 9/16/2007 8:55:00 PM 9:07:00 PM 12 minutes No No Yes BP1 \VOUNGBDV 195
Determination Cause SD T/C1801 TO REPAIR OIL LEAK FROM PREVIOUS EVENT
Action Taken COMPLETED SLOWDOWN
McMains, Stephen E (DOA)
From: GPB, Prod Opt TL (GPBProdOptTL @BP.com)
Sent: Wednesday, September 05, 2007 2:11 PM
To: McMains, Stephen E (DOA)
Cc: GPB, Environ TL; GPB, Environ Advisor East; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim
A: Kurz, John; GPB, Area Mgr North (Gas Plants/GPMA); GPB, Gas Plants OTL; GPB,
Environ Advisor West; GPB, Area Mgr East (FS1/2/COTU /Seawater); GPB, Area Mgr Central
(GC113 /FS3); GPB, Area Mgr West (GC2/WRD); GPB, FS1 OTL
Subject: GPB Gas Flaring Event
To: Steve McMains, AOGCC
steve_mcmainsOadmin.state.ak.us
907- 793 -1241, fax 907-276-7542
From: Hal Tucker, GPB Production Optimization Team Leader
An extended flaring event occurred across GPB on September 3. Flaring in excess of 5,000 MSCF
occurred at CGF, FS1, GC1, GC2 and GC3 when CCP unexpectedly shut down two high stage
compressors while "de- mobilizing" obsolete, turbine, control panels. During the de- mobilization process
an incorrect wire was lifted, resulting in an ESD of two of the four high stage compressors. GPB shut in 2
MMMSCF /d of production to get out of flare. The following volumes were flared at each plant during the
event: CGF 8,400; F81 12,865; GC1 6,475; GC2 4,167; and GC3 6,771 (all volumes MSCF) . Flare
duration was less than one hour at all facilities.
If you require additional information, please don't hesitate to call me.
Hal Tucker
GPB Production Optimization TL
(907) 659-4472
1
1 Facility Number
0290000008
2 Facility Name
PBU CGF B
3 Field
P1311 EOA
4 Operates 15
BP
MonttVYear of Olspoaitbn
October - 2007
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pod as a percent of
Total Volume.
6 safe
2,013,538
Pool Name
Pool Code
Percent
7 Reinjected
9,052,953
PRUDHOE
640150
100.00%
8 Flared or vented t hour or less
3,722 ./
1 hour (see int)
2,700
9 Flared or vented more than
10 Plum and Purge
15,819 .
11 Used for loess consorts (specify in Remarks)
3285,142
12. Other (see instructions)
0
,.. OBldal:UN Only '...
Authorization >1 hr
SaSafety
Z 700
I f
MCF
13. TOTAL VOLUME (ITEMS 612)
14,373,904
Lease Use
MCF
14 NGL Gas Equivalent
2,013,538
Conservation
MCF
15 Purchased gees
0
Waste.
MCF
18 Transferred from FSI. F82, FS3, GCt, GC2, GC3
231,715,217
6 � tssener
/a /I –o7
Dale
�^—
17 Transferred to (Express as a negative I) FSl. FS2, FS3 CCP 6 GPMA Pt.
McIntyre MI
- 217,341,314
18. Remarks: Block 111 Fuel Gas = 3,225,441 rind and Assist Gas = 59,701 mud; Block IT Includes MI Gas to Pt. McIntyre = 2,659,866 nisei
1 hereby certify that the foregoing S true and correct to the best of my knowledge.
/��,
spnatpre ? �2 -fl4._ Troe Manager, Production Taxes and Royalty
Note: All volumes must be
corrected to pressure of 14.65 psle
an a temperature of 60o F.
Authority 20 AAC25.235.
(
Printed Name Bernard W. Hajny Phone (907)584 -5028 Date �� .
Form 10 - 422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
ITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
•
1
'Unplanned Events Tess than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
10/1/2007 1253-1305 328 Not required for unplanned events which
10/1/2007 1416-1441 35 are less than or equal to 1 hour
10/2/2007 0005.0025 190
10/16/2007 0952 -0959 328
10/16/2007 0954 328
TOTAL 1,209
1
"Unplanned Events greater than 1 hour
VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
DATE
TIME
TOTAL
0
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
October 2007
See attachments
1
'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
10/1/2007 0020 -0100 190 See attachments
10/1/2007 1250 -1300 190
10/4/2007 0200 -0215 190
10/8/2007 0800 -0815 255
10/8/2007 0800 -0815 255
10/11/2007 0445 -0502 387
10/12/2007 0512 -0519 328
10/20/2007 1042 -1052 328
10/22/2007 1018 -1028 390
TOTAL 2,513
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Page 1
11/8/2007
10:45 AM
i
!Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
TIME VOLUME DESCRIPTION OF INCIDENT 8 CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments
DATE
10/20)2007 1042 -1202
TOTAL
2,700 See attachments
2,700
TOTAL
Unplanned Events c 1 How 1,209
Unplanned Events > 1 Hour 0
Planned Events < 1 hour and not 2,513
exceedng 5,000 MCF
Planned Events > 1 hour or 2,700
exceeding 5,000 MCF
Pile Purge 15,819
Assist 59,701
TOTAL FLARED VOLUME 81,942
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
October 2007
Flare Start Date 10/1/2007
Flare End Date 10/31/2007
Time Of Flaring
Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF)
07 -406 Ctrld Slowdown 10/1/2007 12:20:00 AM 1:00:00 AM 40 minutes No No Yes BP1\CARIELL 190
Determination Cause T\C 1883 depressured for water wash
Action Taken 1883 T/C depressurized and shut down.
07 -406 Ctrld Slowdown 10/1/2007 12 :50:00 PM 1:00:00 PM 10 minutes No No Ves BP1 \CARIELL 190
Determination Cause Shutdown Tandem *3 (1885) for water wash.
Action Taken Completed shutdown
07 -417 Ctrld Slowdown 10/4/2007 2:00:00 AM 2:15 AM 15 minutes No No
Determination Cause T\C 1888 depressured for water wash
Action Taken 1886 T/C depressurization competed.
07 -434 Chid Slowdown 10/8/2007 8:00:00 AM 8:15:00 AM 15 minutes No No
Determination Cause 1801 SID FOR PLANNED MAINTENANCE, PSV WORK AND IGV WORK
Action Taken
CGF Flare Report
1801 DEPRESSURIZATION COMPLETED
07 -434 Odd Slowdown 10/8/2007 8:00:00 AM 8:15:00 AM 15 minutes No
Action Taken 1802 DEPRESSURIZATION COMPLETED
Ves
Yes
Determination Cause 1802 SHUTDOWN FOR PLANNED MAINTENANCE, PSV WORK
BP1\MCLENOJO 190
BP1\MCLENDJO 255
No Yes BP1 \MCLENDJO 255
07 -439 Ctrld Blowdowrt 10/11/2007 4:45:00 AM 5:02:00 AM 17 minutes No No Yes BP1\YOUNGBDV 387
Determination Cause SD T/C 1855 FOR PLANNED MAINT.
Action Taken COMPLETED SLOWDOWN
Flare Start Date 10/1/2007
Flare End Date 10/31/2007
CGF Flare Report
Time Ot Flaring
Report System Date Start Time Stop Time Duration Intermit'nt B1k Smoke Planned Reported By Volume (MSCF)
07 -441 Ctnd Blowdown 10/12/2007 5:12:00 AM 5 AM 7 minutes No No Yes BP1\CRAMBL 328
Determination Cause Shut doom T/C 1805 for ptamed maintenance.
Action Taken competed lowdown
07 -464 Flare Relief 10/20/2007 10:42:00 AM 12:02:00 PM 80 minutes No No Yes BP1\SHOREKR
Determination Cause T/C -1855 shutdown for unplanned maintenance. (Rub on GG lube oil
Ine) This event caused the stabilizer overhead to go Bare. Flare meter
volume is an estimate. The totalizer is inop. A work order has been
Action Taken written.
Meter -1660
TIC -1805 was fully loaded, process changes were made to reduce
flaring, while maintence was being performed. Unit was repaired,
restarted, and loaded.
2700
07 -464 Flare Relief 10/20/2007 10:42:00 AM 10:52:00 AM 10 minutes No No Yes BP1tSHOREKR 328
Determination Cause T\C 1855 shutdown for planned maintenance
Action Taken Completed troubleshooting, reloaded 1855 T /C, and stabilized
facility process and operation.
07 -460 Ctrld Blowdown 10/22/2007 1018:00 AM !0:28:00 AM 10 minutes No No Yes BPI\CRAMBL 390
Determination Cause T/C 1801 and 1802 shut down for maintenance.
Action Taken Repaired equipment malfunction, restarted 1801 and 1802 T /C, and
returned facility to normal operation.
..S......... ....... ... 00 LINO
McMains, Stephen E (DOA)
From: GPB, Prod Opt TL [GPBProdOptTL a@BP.com]
Sent: Tuesday, October 23, 2007 7:15 PM
To: McMains, Stephen E (DOA)
Cc: GPB, Environ TL; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Environ
Advisor East; GPB, Environ Advisor West; GPB, Gas Plants OTL; GPB, Area Mgr North (Gas
Plants /GPMA); GPB, GC1 OTL; GPB, Area Mgr Central (GC1 /3 /FS3)
Subject: GPB Gas Flaring Events
10/24, 2007
To: Steve McMains, AOGCC
steve_mcmains@admin.state.ak.us
907 - 793 -1241, fax 907- 276 -7542
From: Dwight Warner, GPB Production Optimization Team Leader
An extended flaring event occurred at GC1 on October 21st when CGF had both boosters shut down
resulting in high transit line pressure which went to flare. The WOA flared off the annex wet gas flare valve.
WOA reduced production rates and shut -in 13 wells (312 mmscfd). Flaring began at 10:25 and ended at
11:16 (51 minutes). Total volume flared was 9846 MSCF.
An extended flaring event occurred at GC1 on October 22nd during copus spin cooling on LPS K -7001
compressor for maintenance. Flaring began at 03:18 and ended at 06:04 (166 minutes). Total volume
flared was 678 MSCF.
An extended flaring event occurred at CGF on October 20th when T/C -1855 shutdown for unplanned
maintenance (rub on GG lube oil line). This caused the stabilizer overhead to go to flare. The flare volume
is estimated due to the totalizer not working. A work order has been written for repair. The tandem
compressor was fully loaded, process changes were made to reduce flaring white the maintenance was
performed. The unit was then repaired, restarted, and loaded. Flaring began at 10:42 and ended at 12:02
(80 minutes). Total volume flared was 2700 MSCF.
If you require additional information, please don't hesitate to call me.
Dwight Warner
GPB Production Optimization TL
(907) 659-5566
1 asc 1 01 1
1 Facility Number
0290000008
2 Faulty Name
PBU CGF B
3 Field
PBU - EOA
4 Operator
BP
5. MonttWear of Disposition
November -2007
Disposition
Volume MCF
20. For production horn murple pools, list contntution d each peat as a percent of
Total Volume.
6. Sold
2,152,537
Pool Name
Pool Code
Percent
7. Rsalpcted
10,582656
PRUDHOE
640150
100.00%
8 Flared or vented 1 tour or bas
1,600
9 Flared or vented more than 1 hour (see kWh)
0
10 Pea are Puree
15,322
11. Used for lease operations (specify in Remarks)
3,148,727
12. Otter (see instructions)
0
rv�rw va �y,y
1,4S/Wits. ! ^` 'i' .+^.P!wltl�T#r�A- N1pa & 41 d.,k
Authorization >1 hr
Safety
MCF
13. TOTAL VOLUME (ITEMS 6-12)
15,900,842
Lease Use
MCF
14. NGL Gas Equivalent
2,152,537
Conservation
MCF
15 Purchased gas
0
Waste.
MCF
16. Transferred from FSI, FS2. FS3. GC'. GC2. GO
235.106,411
Corryrllietiorler Dale
17 Transferred to 1Expresn as a negative a) FSt. FS2, 153 CCP 8 GPMA PI
McIntyre MI
- 219.205.570
18 Remarks. Block 11: Fuel Gas = 3.042,228 nnet and Aasig Gas= = 56.4` 9 Mad; Block 17: IUdludes MI Gas to Pt. McIntyre a 2.046,922 mace
I hereby certify that tto regomg is Grp ea to the hest or my wawledye.
Sense nee nee Manager, Production Taxes and Royalty
Note: All volumes must be
corrected to pressure of 14.65 psla
and to a temperature of 60o F.
Authority 20 AAC25.235.
(/
Q v
Printed Nana Bernard W. Hajny Prone (907)56a -5028 Date / / V ?
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
DATE TIME
11/9/2007 0500 -0510
11130/2007 1530 -1540
11/30/2007 1715 -1725
TOTAL
DATE
DATE
TIME
TOTAL
TIME
TOTAL
0
0
BP EXPLORATION (ALASKA) INC.
PRUDHOE SAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
November 2007
1
'Unplanned Events less than or equal to 1 hour
VOLUME DESCRIPTION OF INCIDENT & CAUSE
400 Not required for unplanned events which
195 are less than or equal to 1 hour
195
790
1
'Unplanned Events greater than 1 hour
VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments
'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
11/2/2007 0055 -0105 430 See attachments
11/3/2007 1010 -1024 350
11/9/2007 1224 -1228 30
TOTAL 810
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are Tess than or equal to 1 hour
See attachments
1
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
1
'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
Page 1
TOTAL
Unplanned Events c 1 Hour 790
Unplanned Events > 1 Hour 0
Planned Events c 1 hour and not 810
exceeding 5,000 MCF
Planned Events> 1 hour or 0
exceeding 5.000 MCF
Pilot Purge 15,322
Assist 56,499
TOTAL FLARED VOLUME 73,421 12/10/2007
1:36 PM
Flare Start Date 11/1/2007
Flare End Date 11/30/2007
CGF Flare Report
Time Of Flaring
Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF)
07 -481 Flare Relief 11/2/2007 12:55:00 AM 1:05:00 AM 10 minutes No No Yes BP1\CRAMBL 430
Determination Cause T/C 1886 depressured for Hot Gas Path work.
Action Taken 1886 T/C depressurized and shut down.
07 - 483 Flare Relief 11/3/2007 10:10:00 AM 10:24:00 AM 14 minutes No No Yes BP1 \CRAMBL 360
Determination Cause T/C 1857 blown down for water wash activities.
Action Taken T/C 1857 down down to zero psi.
07 -490 Flare Relief 11/9/2007 12:24:00 PM 12:28:00 PM 4 minutes No No Yea BPI \MCLENWO 30
Determination Cause T/C 1888 depressured from 40 psi to 0
Action Taken T/C 1888 depressurization completed.
1. Facility Number
0290000008
12. Facility Name
PBU CGF B
3. Field
PBU - EOA
4 Operator 5 Month/Year d Disposition
BP (December -2007
Disposition
Volume MCF
20. For production from multiple pods, list contribution of each pool as a percent of
Total Volume.
6. Sold
2,190,264
Pool Name
Pam Code
Percent
7. Reinjected
8,353,171
PRUGHOE
640150
100.00%
8. Flared or vented 1 hour or Mss
32,418 .
9. Flared or vented more than 1 h (see Instr.)
•I
57,291
10. Not and Purge
16,122
11. Used for Mass operations (specify in Remarks)
3,412,795
12. Other (see Instructions)
0
Aulfwmakon on a1 hr
hr
Safety
G r _
5 7, 1 /7
MC
'in.
13. TOTAL VOLUME (ITEMS 6-12)
14,062,061
Lease Use
MCF
14 NGL Gas Equivalent
2,190,264
Conservation
MCF
15. Purchased gas
0
Waste
MCF
16. Transferred from - . FS1, FS2, FS3, GC1, GC2, G03
251,108,856
��
m is sioner Date
17. Transferred to: (Express as a negative a) F81, F52, F83. CCP & GPMA PL
McIntyre MI
-237,046,793
t e. Remarks: Block 11: Fuel Gas Gas = 3,357,827 asset and Assist Gas = 54,968 et Tuck 17: Inc
Ams — t o e t) 40 tz> OiCk &IA.� a 401 5 O t" 4 16,-W•44
fie 14-C ti J
^
udes MI Gas to Pt. McIntyre = 1,478,724
t/ ms /,I -
'- I kr • M o51( pot caE sx P 1L (4 a G.4 tI
1 hereby certify that the a ma and ed to the best d my knowledge.
Signature O� Title Manager, Production Taxes and Royalty
Note: All volumes must be
corrected to pressure of 14.65 pale
and to a temperature of 60o F.
Authority 20 AAC25235.
Pnnted Name Bernard W. Rainy Phone(907)564 Date / /5' — dg
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
0139 -0150 796
1138-1148 2,593
1138 -1150 9,388
1220 -1230 328
1230 -1240 430
1730 -1800 387
2030 -2036 400
2245 -2343 7,770
1310 -1410 4,560
1030 - 1037 387
1540 -1600 387
1545 -1615 1,650
1305 -1312 430
1420 -1430 40
1510 -1513 8
TOTAL 32,382
1
DATE
12/7/2007
12/712007
12/10/2007
12/11/2007
12/11/2007
12/11/2007
12/11/2007
12111/2007
12/12/2007
12/14/2007
12/15/2007
12/15/2007
12/16/2007
12/16/2007
12/18/2007
12/18/2007
12/18/2007
BP EXPLORATION (ALASKA) INC,
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
December 2007
(Unplanned Events less than or equal to 1 hour
TIME a VOLUME DESCRIPTION OF INCIDENT & CAUSE
0750 -0800 2,398 Not required for unplanned events which
1230 -1240 430 are less than or equal to 1 hour
, ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
1
(Unplanned Events greater than 1 hour
DATE _ _. TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE , l :, , ,,,,, ACTION TAKEN TO ELIMINATE CAUSE.
12/7/2007 1230 -1415 45,830 See attachments
12/7/2007 1400 -2000 7,000
12/11/2007 1118 -1854 4,000
12/15/2007 1310 -1905 461
TOTAL
DATE
12/31/2007 1319 -1340
TOTAL
57,291
1
(Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
36 See attachments
36
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Page 1
1/ &2008
1:27 PM
DATE
TOTAL
Unplanned Events c 1 Hour 32,382
Unplanned Events > 1 Hour 57,291
planned Events c 1 hour and not 36
exceeding 5,000 MCF
Planned Events > 1 hour or 0
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
TIME„
TOTAL
0
RAW 76122
Mai 54,968
160,799
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL GAS FACILITY
GAS FLARING INCIDENT REPORT
December 2007
!Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
VOLUME ,; DESCRIPTION OF INCIDENT & CAUSE„, ACTION TAKEN TO ELIMINATE
See attachments
See attachments
Page 2
178!2008
1:27 PM
Flare Start Date 12/1/2007
Flare End Date /2131/2007
Action Taken
CGF Flare Report
Time Of Flaring
Report System Date Start Time Stop Time Duration Intermi'nt Blk Smoke Planned Reported By Volume (MSCF)
07 -543 Flare Relief 12/7/2007 12:30:00 PM 2:15:00 PM 105 minutes Ves No No BP1 \MCLENDJO
Determination Cause Extended flaring event occurred while awaiting operator /maintenance
evaluation. CPS had a second power outage causing CCP to s/d as
there T /C. CGF flared for the field.
Action Taken
Equipment was restarted at 14:15 hours. CCP started to load a few
T/C.
07 -543 Flare Relief 12/7/2007 2:00:00 PM 8:00:00 PM 380 minutes Yes No No BP1\MCLENDJO
Determination Cause Plant upset due to power failure. Restart of T/C -1855 Start-up /Loading
On/Off the flare for time duration (Intermittent)
Mtr.0660)
Started off-line T /C, and stabilized facility process and operation.
07 -555 Flare Relief 12/11/2007 11:18:00 AM 6:54:00 PM 456 minutes Yes No No BPIWAGED2
Determination Cause Power failure- MI Compressors s/d. Stabilizer Overhead to flare. Upset
and restart flare volume. This volume intermittent over time period.
(Mtr.M660)
Action Taken Volume estimated from 51F457A1 and BI. Flow meal working F- 45710,
not registering flow
Compressor restart /Process stabilized
07 -573 Flare Relief 12/15/2007 1:10:00 AM 7:05:00 AM 355 minutes Yes No No BP PSMITHRS
Determination Cause Seven starts on Refer 2. shutting down on high power turbine vibration
while starting.
Action Taken
Purge complete and turbine started
45830
7000
4000
461
Flare Start Date 12/1/2007
Flare End Date 12/31/2007
Time Of Flaring
Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF)
Action Taken
CGF Flare Report
07 -599 Flare Relief 12/31/2007 119 PM 1:40:00 PM 21 minutes No No Yes BPI \TOWNETJ
Determination Cause Swapped LTS 3 to CCP 1878 tandem compressor requiring CCP to
unload compressor and CGF to flare for field during swap -over.
CCP loaded 1878 Compressor.
38
McMains, Stephen E (DOA)
From:
Sent:
To:
Cc:
Subject:
To: Steve McMains, AOGCC
steve_mcmains@admin.state.ak.us
907 - 793 -1241, fax 907 - 276 -7542
From: Beverly Luedke -Chan, Field Optimization Engineer - on behalf of
Hal Tucker, GPB Production Optimization Team Leader
On December 7 beginning at 7:55 am, an extended flaring event happened at Prudhoe Bay. A power substation serving
CCP went down, causing most of CCP and CGF to shut down. The gas transit line pressured up and all facilities feeding
CCP and CGF went to flare (LPC was not affected). After being restored, the substation went down again. Here is a
breakdown of flare volumes for each facility. Duration is total duration over both substation failures.
CCP:
CGF:
FS1:
FS2:
FS3:
GC1:
GC2:
GC3:
1,692 MSCF
55,658 MSCF
15,834 MSCF
140 MSCF
368 MSCF
14,375 MSCF
10,312 MSCF
8,600 MSCF
Total volume: 106,979 MSCF.
GPI3, Optimization Engr [GPBOptimizationEngr @BP.comj
Monday, December 10, 2007 3:08 PM
GPB, Prod Opt TL; McMains, Stephen E (DOA)
GPB, Environ TL; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Environ
Advisor East; GPB, Area Mgr Central (GC1/3/FS3); GPB, FS3 OTL; GPB, Environ Advisor
West GPB, Area Mgr East (FS1 /2 /COTU /Seawater); GPB, Area Mgr North (Gas
Plants /GPMA); GPB, Area Mgr West (GC2IWRD); GPB, Gas Plants OTL; GPB, FS1 OTL;
GPB, FS3 OTL; GPB, GC1 OTL; GPB, GC2 OTL; GPB, GC3 OTL
GPB Gas Flaring Event
45 min
7 hr 55 min (intermittent)
1 hr 38 min
14 min
45 min
3 hr 9 min
33 min
41 min
Flaring began at 7:55 and was intermittent through as late as 20:00 at CGF, the last facility to be restored to power. CCP
substation was washed that day, followed by CGF and the seawater plants. All substations are In the process of being
washed again after the recent windstorm caused dirtying of the insulators from flying dirt/dust/gravel (not enough snow
cover).
If you require additional information, please don't hesitate to call me.
Beverly Luedke -Chan
GPB Field Optimization Engineer
(907) 659-4382
For
Hal Tucker
GPB Production Optimization TL
(907) 659 -4472
1
McMains, Stephen E (DOA)
From: GPB, Prod Opt TL (GPBProdOptTL @BP.com]
Sent: Friday, December 14, 2007 10:35 PM
To: McMains, Stephen E (DOA)
Cc: GPB, Environ TL; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Environ
Advisor East; GPB, Area Mgr Central (GC1 /3 /FS3); GPB, Environ Advisor West; GPB, Area
Mgr East (FS1 /2 /COTU /Seawater); GPB, Area Mgr North (Gas Plants /GPMA); GPB, Area Mgr
West (GC2/WRD); GPB, Gas Plants OTL; GPB, FS1 OTL; GPB, FS3 OTL; GPB, GC1 OTL;
GPB, GC2 OTL; GPB, GC3 OTL; GPB, FS2 /COTU OTL
Subject: GPB Gas Flaring Event
To: Steve McMains, AOGCC
steve_mcmains@admin.state.ak.us
907- 793 -1241, fax 907 - 276 -7542
From Dwight Warner, GPB Production Optimization Team Leader
On December 11 beginning at 11:18 am, an extended flaring event happened at Prudhoe Bay. A power substation serving
CGF went down while work was being done on the transmission and distribution system. This caused a shutdown at CGF
and flaring at the facilities below. The total volume and duration is reported below.
CGF: 17,126 MSCF 7 hr 36 min - The duration is mostly associated with the MI compressors. All of the tandems only
flared for 10 -12 min while troubleshooting and reloading
FS1: 4,317 MSCF 24 min
FS2: 218 MSCF 52 min
GC1: 6,562 MSCF 21 min
GC2: 3,542 MSCF 68 min
GC3: 6,198 MSCF 51 min
Total volume: 37,963 MSCF.
Flaring began at 11:18 and was intermittent through as late as 18:54 at CGF. Most of the facilities were back on line within
an hour.
If you require additional information, please don't hesitate to call me.
Dwight Warner
GPB Production Optimization TL
(907) 659 - 5566/4472
1
McMains, Stephen E (DOA)
From: GPB, Prod Opt TL [GPBProdOptTL @BP.com]
Sent: Saturday, December 15, 2007 9:13 AM
To: McMains, Stephen E (DOA)
Cc: GPB, Environ TL; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Environ
Advisor East; GPB, Area Mgr Central (GC1 /3 /FS3); GPB, Environ Advisor West; GPB, Area
Mgr East (FS1 /2 /COTU /Seawater); GPB, Area Mgr North (Gas Plants /GPMA); GPB, Area Mgr
West (GC2/WRD); GPB, Gas Plants OTL; GPB, FS1 011; GPB, GC1 OTL; GPB, GC2 OTL;
GPB, GC3 OTL
Subject: GPB Gas Flaring Event
To: Steve McMains, AOGCC
Steve mcmains @admin.state.ak.us
907 - 793 -1241, fax 907- 276 -7542
From: Dwight Warner, GPB Production Optimization Team Leader
On December 13 beginning at 00:12 am, an extended Flaring event happened at Prudhoe Bay. The large
dirt/contamination caused flashover that damagaed the CPS yard step -up transformer T -6 and caused the severe voltage
sags and surges to go throughout the entire GPB power grid and shutdown numerous pieces of equipment at some of the
facilities causing Flaring. Shown below are the totals for each facility and the longest duration of any flaring event due to the
outage at the respective facility.
FS1: 86,656 MSCF 5 hr PC 1802, 1803 and 1804 flare reports
GC1: 19,479 MSCF 85 min
GC3: 892 MSCF 4 hr 17 min
Total volume flared related to this event: 107,027 MSCF
On December 14 beginning at 20:45 am, an extended flaring event happened at Prudhoe Bay. A substation at CCP /CGF
surged /shorted which caused CGF to loose all power and the FS1 annex to shut down. This also resulted in flaring at
some of the other facilities.
CGF: 3,432 MSCF 58 min
FS1: 13,750 MSCF 90 min 8125 MSCF 90 min for shut -in of wells and loading 1803, 5625 MSCF 60 min due to
annex shutdown OSD
GC1: 13,750 MSCF 44 min compressors were not restarted until 23:07
GC2: 4,167 MSCF 16 min
GC3: 9,456 MSCF 37 min
Total volume flared related to this event: 44.255 MSCF
If you require additional information, please don't hesitate to call me.
Dwight Warner
GPB Production Optimization TL
(907) 659 - 5566/4472
1
FW: GPB Gas Flaring Event Page 1 of 1
McMains, Stephen E (DOA)
From: GPB, Prod Opt TL IGPBProdOptTLQBP.com)
Sent: Tuesday, December 18, 2007 6:39 AM
To: McMains, Stephen E (DOA)
Subject: FW: GPB Gas Flaring Event
Steve,
Appologize if you received this message twice. I got a return message with our system that stated it could not find
the admin.stat.ak.us server.
Dwight
To: Steve McMains, AOGCC
steve_mcmains @admin. state.ak.us
907 - 793 -1241, fax 907 - 276 -7542
From: Dwight Warner, GPB Production Optimization Team Leader
On 12/15/07 an extended flaring event occurred at CGF. The intial event was due to the power outage at
CGF previously reported. This event occurred while attempting to restart the refrigeration unit #2 which
kept shutting down the power turbine due to high vibration. Flaring began at 01:10 and ended at 07:05
(355 minutes). Total volume flared was 461 MSCF.
If you require additional information, please don't hesitate to call me.
Dwight Warner
GPB Production Optimization TL
(907) 659 - 5566/4472
12/18/2007