Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPBU GC 1 / BPSTATE OF ALASKA AOGCC GAS DISPOSITION FILES YEAR: 2007 FACILITY: PBU GC 1 OPERATOR: BP EXPLORATION 1. Facility Number 0290000031 2 Facility Name PBU GC 1 3. Field PBU - WOA 14. Operator 5. Mondb Yaer of Dlepoeibon BP ( January-2007 Disposition Volume MCF 20. For production from multiple pools. list contribution d each pool as a percent of Total Volume. 8. Sold 0 Pool Name Pool Code Percent 2 Reinjected 0 PRUDHOE 640150 95.13% LISBURNE 640144 0.29% 8. Flared avented 1 hour or less 7,448 L.7 MIDNIGHT SUN 640158 0.51% PT MCINTYRE 640180 4.07% m 9. Flared or vented more an 1 how (sea In str.) 2,697 T BOREALIS 640130 0.00% AURORA 640120 0.00% 10. Pilot and Purge 40,340 / 11. Used for lease operations (specify in Remarks) 992,804 12. Other (sea instructions) 0 Authorization >1 hr Safety 2, C97 MCF 13. TOTAL VOLUME (ITEMS 6-12) 1,043,289 Lease the MCF 14. NGL Gas Equwalent 0 CdlsaNation MCF 15. Purchased gas 0 Waste_ MCF 18. Transferred from: p ����' �// la albflar Date 17. Transferred to: (Er¢ras as a negative I) CGF - 71,346,619 it Remarks: Block 11: Fuel Gas = 992,814 nscf and Assist Gas = 0 mscf 1 hereby certify that the foregoing Signature is true and of knowledge. Title Manager, Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 AAC25.215. Printed Name Bernard W. Hajny Phone (902)564-5028 Date ..,2 -/b -0 7 Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit In Duplicate 'Unplanned Events less than or equal to 1 hour 1 DATE 1/5/2007 1/11/2007 1/11/2007 1/11/2007 1/12/2007 1/16/2007 1/16/2007 1/23/2007 1/31/2007 1/31/2007 DATE 1/4/2007 1/6/2007 1/12/2007 1/13/2007 TIME 0119 -0140 0648 -0732 0650 -0700 2318 -2328 1003-1017 0428-0433 1710 -1717 1241 -1325 0825 -0839 0941 -0949 TOTAL 'Unplanned Events greater than 1 hour 1 TOTAL (Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE _... ,¢ TIME: -: .,: . TOTAL VOLUME 321 6,111 69 104 194 28 10 336 175 100 7,448 2,697 0 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT January 2007 DESCRIPTION OF INCIDENT & CAUSE Not required for unplanned events which are less than or equal to 1 hour TIME ..�. VOLUME DESCRIPTION OF INCIDENT & CAUSE 1841 _ 434 See attachments 1733 -1946 1 569 1820 -2400 472 0000- 0240 222 ACTION TAKEN TO ELIMINATE CAUSE - Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE -, ,,_,,, See attachments VOLUME.,,. DESCRIPTION OF INCIDENT & CAUSE m . ; ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments (Planned Events Exceeding 1 Hour OR Exceeding 5000 Mot 1 40,940 Assist 0I TOTAL FLARED VOLUME TIME ,, ., VOLUME,.., DESCRIPTION OF INCIDENT a CAUSE See attachments TOTAL TOTAL Unplanned Events < 1 Harr 7,448 Unplanned Events > 1 Hour 2,697 Planned Events c 1 hour and not O exceeding 5.000 MCF Planned Event > 1 hour or 0 exceeding 5,000 MCP Pilot Purge 0 50.485 ACTION TAKEN TO ELIMINATE CAUSE See attachments Paps 1 2/11/2007 2:59 PM Flare Start Date 1/1/2007 Flare End Date 1/31/2007 Report Date Action Taken GC1 Flare Report Time Of Flaring Start Time Stop Time Duration Intermittent Slack Smoke Planned 07 -54 Rare Relief 1/4/2007 6:41:00 PM 10:51:00 PM 250 minutes No No No Determination Cause Unknown source of flaring at this time. 07 -10 Flare Relief 1/6/2007 5:33:00 PM 7:48:00 PM 133 minutes No Flaring stopped, operations unable to determine source. No No Determination Cause LP and IP compressors shut down due to cooling water problem. Action Taken 07 - 27 Rare Relief 1/12/2007 6:20:00 PM 12:00:00 AM 340 minutes Determination Cause Action Taken 07-28 Flare Relief 1/13/2007 12:00:00 AM 2:40:00 AM 180 minutes No No action was taking while GC personal troubleshooting problem and restarted compressors at 1831 hrs and 1832 hrs. Took until 1937 his to get compressors to bite. No No No GC -1 HP flare header pressure started increasing. GC -1 operators started Boling for what was relieving into HP flare system. GC -1 operators still looking into wtiats relieving into their HP flare system. No No Determination Cause GC -1 HP flare header pressure increased. GC -1 operators looking for what is relieving into HP flare system. Action Taken GC -1 rover operator found LPS discharge PSV (center one) that had coin off its seat. He isolated PSV and flare header pressure dropped off. Reported By Volume (MSCF) BP11TUCKERHE BPICLARKTL BP1\MOMAMD BP1111EPPNEEJ 434 1569 472 222 1 Faaliry Number 0290000031 2. Facility Name PBU GC 1 3 Field PBU - WOA 4 Operator BP 5. MonthYear of Disposition February Disposition Volume MCF / 20. For production from multiple pods, list contribution at each pod as percent of Total Volume 8. Sold 0 Pool Name Pod Clue Percent 7� 0 PRUDHOE 640150 94.77% LISBURNE 640144 0.26% 8. Flared or vented 1 hour orless 1,849 t/ MIDNIGHT SUN 640158 0.24% PT MCINTYRE 640180 4.73% 9 Flared or vented more than 1 hoe (see rand 26,042 BOREALIS 640130 0.00 ° .6 AURORA 640120 0.00% 10. Pilot and Purge 33,790 ✓ 11. Used far base operations (specify in Remarks) 805,470 12. Other (see instructions) 0 Oalq�IlNe Gdy .. - ,..:.��+:�^ y -;mo MCF Aumonration >1 hr. Safe H 13. TOTAL VOLUME (ITEMS 6-12) 867,151 Lease Use MCF 14. NGL Gas Equivalent 0 Conservation MCF 15. Purchased gas 0 Waste. MCF 16. Transferred from: 0 / 4 - Y- O -2 Conadssione r Date 17. Transferred to: (Express as a negative e) CGF - 65,518,612 te. Remarks. Block 11. Fuel Gas = 805.470 ntscf and Assist Gas. 01n cf I hereby certify mat the f °going is true and correct Signature C`'% Y / / A / the best of my knowledge. Time Manager, Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 pals and to a temperature of 60o F. AuthorIM 20 AAC25.235. Printed Name Bernard W. Hajny Rhone (907)564'5028 Date 5 - l/ 7 Form 10 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate !Unplanned Events Tess than or equal to 1 hour 1 DATE TIME , VOLUME DESCRIPTION OF INCIDENT R CAUSE 2/1/2007 0740 - 0748 44 Not required for unplanned events which 2/17/2007 1618 -1636 188 are less than or equal to 1 hour 2/19/2007 1726 -1734 111 2/20/2007 0845 -0856 115 2/22/2007 1326 - 1345 343 2/24/2007 1639 - 1706 562 2/24/2007 1 714-1 721 486 DATE, TOTAL 'Unplanned Events greater than 1 hour DATE TIME . VOLUME DESCRIPTION OF INCIDENT & CAUSE 2/10/2007 1340 -1545 26,042 See attachments TOTAL 'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf TOTAL (Planned Events Exceeding 1 Hour OR Exceeding 5000 Mct Fes ._ DATE .� TIME »z � . VOLUME„ _. DESCRIPTION OF INCIDENT & CAUSE � a*a,a ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 1,849 26,042 0 0 TOTAL Unplanned Events < 1 Hour _ . 1,849 Unplanned Events > 1 Hour 26,042 Planned Events c 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pitt Purge 33,7901 Assist Si 0 1 TOTAL FLARED VOLUME 61.661 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT February 2007 ACTION TAKEN TO ELIMINATE CAUSE _ ,,,,,, Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE See attachments 1 VOLUME.__. DESCRIPTION OF INCIDENT & CAUSE _ ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments Page 1 3/5/2007 3:37 PM Flare Start Date 2/1/2007 Flare End Date 2/28/2007 GC1 Flare Report Time Of Flaring Report Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume (MSCF) 07-62 Flare Relief 2/10/2007 1:40:00 PM 3:45:00 PM 125 minutes No No No BP1 \MOMAMD 26042 Determination Cause High gas transit line pressure caused by CGF compressor problems due to Booster 1801 1 nd 1802 S/D Action Taken WOA reduced production rates and shut -in 22 wells equaling 1000 mrnscfd. EGA reduced production rates and shut - in 13 wells equaling 1500 mmscfd. Wells were shut -in or choked back starting at 1340 hours. FW: GPB Gas Flaring Incident Subject: FW: GPB Gas Flaring Incident From: "GPB, Prod Opt TL" <GPBProdOptTL @BP.com> Date: Tue, 13 Feb 2007 15:52:25 -0900 To: steve_mcmains @admin.state.ak.us CC: "GPB, Environ TL" <GPBEnvironTL @BP.com >, "GPB, Environ Advisor West" <GPBEnvimnAdvisorWest @BP.com >, "Fiedler, Anne M" <Anne.Fiedler@bp.com>, "Benson, Gary - A" <Gary.Benson @bp.com >, "Pfeiffer, Jim A" <Jim.Pfeiffer@bp.com >, "Kure, John" <john.kurz@bp.com >, "GPB, Gas Plants OTL" <GPBGasPlantsOTL@bp.com >, "GPB, Area Mgr North (Gas Plants/GPMA)" <GPB_AreaMgrNorth@BP.com >, "GPB, Prod Opt TL" <GPBProdOptTL@BP.coin> To: Steve McMains, AOGCC steve_mcmains@admin.stateak.us 907- 793 -1241, fax 907 - 276 -7542 From: Dwight Warner, GPB Field Optimization Engineer for Hal Tucker, GPB Prod Optimization Team Leader An extended flaring event occurred on February 10, 2007. GC1 went into flare due to high transit gas line pressure when a fuse failed at CGF on the Boosters 1801 and 1802 which caused them to shutdown. W OA reduced production rates and shut -in 22 wells equaling 1000 mmscfd. EOA reduced production rates and shut -in 13 wells equaling 1500 mmscfd. Wells were shut -in or choked back starting at 1340 hours. Flaring occurred from 1340 hrs to 1545 hrs (125 minutes), total volume flared was 26042 MSCF. If you require additional information, please don't hesitate to call me. Dwight Warner GPB Field Optimization Engineer (907) 659 -4382 For Hal Tucker GPB Prod Optimization Team Leader (907) 659-4472 I of 1 2/14/2007 7:05 AM 1 Facility Number 0290000031 2. Facility Name PBU GC 1 3 Field PBU • WOA 1 operate( IBP $. Month lYeer of Disposition March -2007 Disposition Volume MCF ✓ 20. For production from multiple pools, list contnbution 04 each pool as a percent of Total Volume 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 94.67% LISBURNE 640144 0.28% 8. Flared or vented 1 hour or less 1,458 MIDNIGHT SUN 640158 0.34% PT MCINTYRE 640180 4.71% 9. Flared or vented more than 1 taut (see mstr.) 69 BOREALIS 640130 0.00% AURORA 640120 0.00% 10. Rot and Purge 38,679 11. Used to lease operations (specify in Remarks) 923,982 12. Omer (see instructions) 0 -- •• .r >.-» ;F"= :- , ., ; , " d+: Authorization >1 hr. Sate Safety 69 MCF 13. TOTAL VOLUME (ITEMS 6 964,188 Lease Use MCF 14 NGL Gas Equivalent 0 Conservation MCF 15. Purchased gas 0 Waste: MCF 1 Transferred front 0 ss - Dare 7 177 . Transferred to: o: (E (Express as a negative a) CGF - 72,609,812 18. Remarks: Block 11: Fuel Gas = 923.982 mscf and Assist Gast 0 ms f I hereby certiy mat me f &going is true and correct to one hest of my knowledge Signature /�� / Title Manager, Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 600 F. Authority 20 AAC25.235. // 11JJ // Printed Name Bemard W. Hajny Paw (907)564 -5028 Date /i -0 7 Phone cc Form 10-422 Rev 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate !Unplanned Events Tess than or equal to 1 hour VOLUME DESCRIPTION OF INCIDENT & CAUSE 1,458 Not required for unplanned events which are less than or equal to 1 hour DATE TIME 3/11/2007 0843 -0850 3/26/2007 1430 -1610 DATE DATE TOTAL TOTAL TIME TOTAL TIME TOTAL 1,458 !Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct 1 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT March 2007 !Unplanned Events greater than 1 hour 1 DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 69 See attachments 69 TOTAL Unplanned Events < 1 Hour 1,458 Unplanned Events > 1 Hour 69 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge t 38,679' Assist _ v 0. TOTAL FLARED VOLUME 40,206 VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments 0 !Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf 1 VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments 0 ACTION TAKEN TO ELIMINATE CAUSE Not required tor unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE See attachments ACTION TAKEN TO ELIMINATE CAUSE See attachments ACTION TAKEN TO ELIMINATE CAUSE See attachments Page 1 4/5/2007 9:43 AM Flare Start Date 3/1/2007 Flare End Date 3/31/2007 Report Number GC1 Flare Report Time Of Flaring Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume (MSCF) 07 - 104 Flare Relief 3/26/2007 2:30:00 PM 4'10:00 PM 100 minutes No No No 13P1 \MESSERTD Determination Cause Hardware failure caused flaring Action Taken Hardware repaired. 69 1. Facility Number 0290000031 2. Facility Name PBU GC 1 3 Field PBU - WOA f4. Operates f BP 5. Month/Year d Disposition April -2007 Disposition Volume MCF 20 For production from multiple pools, list contribution of each pool as a percent of Total Vdume 6' Sold 0 Pool Name Pool Code Percent r Reinjected 0 PRUDHOE 840150 94.71% LISBURNE 640144 0.10% 8 Flared or vented 1 hour or less 7,898 MIDNIGHT SUN 640158 0.71 =i, PT MCINTYRE 640180 4.48% 1 hour (see kistr.) 2, 940 '� BOREALIS 640130 0.O0% 9 Flared or vented mote han re AURORA 640120 0.00% 10. Pilot and Purge 37,550 ✓ 11. Used for lease operations (spealy in Remarks) 724,603 12. Other (see Instructions) 0 -v r .' �. yh _. �'PlO91I1 - .... Authorization >1 hr. Safety Z $443 1 MCF 13, TOTAL VOLUME (ITEMS 6-12) Lease Use MCF 14. NGL Gas Equivalent 0 Conservation MCF 15 Purchased gas 0 Waste. MCF 16. Transferred from: 0 _ Commissioner bale 17. Transferred to: (E0y ress as a negative a) CGF - 67 864 729 18. Remarks: Block I I: Fuel Gas = 724,603 mscf and Assist Gas = 0 mscf I hereby certify that the foregoing is true and correct t the best of my knowledge. Signature 77 rue Manager, Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 pales and to a temperature of 60o F. Authority 20 AAr:25.235. Printed Name Bernard W. Hajny Phone (907)564 -5028 Date s Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate 1 !Unplanned Events Tess than or equal to 1 hour VOLUME DESCRIPTION OF INCIDENT & CAUSE 5,903 Not required for unplanned events which 1,229 are less than or equal to 1 hour 278 486 DATE TIME 4/8/2007 1320 -1410 4/24/2007 2149 -2248 4/28/2007 2228 -2232 4/30/2007 0504 -0511 TOTAL 7,896 1 !Unplanned Events greater than 1 hour DATE - - TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 4/7/2007 2200 -2330 996 See attachments 4/16/2007 1700 -1920 1,944 TOTAL DATE DATE TIME TOTAL TIME TOTAL 2,940 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC - GAS FLARING INCIDENT REPORT April 2007 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf VOLUME DESCRIPTION OF INCIDENT & CAUSE ,,,:.., See attachments 0 !Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments 0 TOTAL Unplanned Events c 1 Hour 7,896 Unplanned Events > 1 Hour 2,940 Planned Events c 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge TWir^x 37,550 Assist 'r: s F r4. 0 TOTAL FLARED VOLUME 48,386 ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE See attachments 1 ACTION TAKEN TO ELIMINATE CAUSE See attachments 1 ACTION TAKEN TO ELIMINATE CAUSE See attachments Page 1 5/8/2007 10:49 AM Alm Flare Start Date 4/1/2007 Flare End Date 4/30/2007 Time Of Flaring Report Number Date Start Time Slop Time Duration Intermittent Black Smoke Planned Reported By Volume (MSCF) 07 -127 Flare Relief 4/7/2007 8:00:00 PM 9:30:00 PM 90 minutes No No No BPI \MOMAMD 996 Determination Cause LPS compressor K -7001 shut down because of water wash Action Taken Flaring was permitted to continue while GC operations personnel attempted cod down turbine for water wash. 07 -147 Flare Relief 4/18/2007 5:00:00 PM 7:20:00 PM 140 minutes NO No No BP1 \MOMAMD 1944 .1'- Determination Cause Extended flaring event occurred while awaiting GC operator/maintenance evaluation. Flare contrdler issue. Action Taken Flaring was permitted to continue while GC operations personnel attempted to trouble shoot the equipment. GC1 Flare Report GPB Gas Flaring Incident Subject: GPB Gas Flaring Incident From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com> Date: Sun, 08 Apr 2007 16:17:00 -0800 To: steve_mcmains a@admin.state.ak.us CC: "GPB, Environ TL" <GPBEnvironTL@BP.com >, "GPB, Environ Advisor West" <GPBEnvironAdvisorWest@BP.com "Fiedler, Anne M" <Anne.Fiedler @bp.com >, "Benson, A" <Gary.Benson ®bp.com>, "Pfeiffer, Jim A" <Jim.Pfeiffer @bp.com >, "Kurz, John" <john.kurz @bp.com >, "GPB, GC1 OTL" <GPBGCIOTL@bp.com >, "GPB, Area Mgr Central , (GC1 /3/FS3 GFBAreaMwCetttral@BP.com> To: Steve McMains. AOGCC steve_mcmains @admi n. state. ak, us 907 - 793 -1241, fax 907-276-7542 From Dwight Warner, GPB Field Optimization Engineer for Hal Tucker, GPB Prod Optimization Team Leader An extended flaring event occurred on April 7 at Greater Prudhoe Bay. The event occurred at GC1 when LPS compressor K -7001 shut down for a water wash. Flaring continued while operations personnel attempted to cool down the turbine for the water wash. Flaring occurred from 0800 to 0930 (90 minutes), total volume flared was 996 MSCF. If you require additional information, please don't hesitate to call me. Dwight Wamer GPB Field Optimization Engineer (907) 659 -4382 for Hal Tucker GPB Prod Optimization Team Leader (907) 659 -4472 1 of I 4/9/2007 8:17 AM GPB Gas Flaring Incident Subject: GPB Gas Flaring Incident From: "GPB, Prod Opt TV' <GPBProdOptTL @BP.com> Date: Thu, 26 Apr 2007 08 :02:57 -0800 To: steve_mcmains@admin.state.ak.us CC: "GPB, Environ TL" <GPBEnvironTL @BP.com >, "GPB, Environ Advisor West" <GPBEnvironAdvisorWest@BP.coms, "GPB, Environ Advisor East" <GPBEnvironAdvisorEast @BP.com >, "Fiedler, Anne M" <Anne.Fiedler@bp.com >, "Benson, Gary A" <Gary.Benson @bp.com >, "Pfeiffer, Jim A" <Jim.Pfeift'er @bp.com >, "Kurz, John" <john.kurz @bp.com >, "GPB, GC1 OTL" <GPBGCI OTL @bp.com >, "GPB, Area Mgr Central (GC1 /3/FS3)" <GPBAreaMgrCentral @BP.com >, "GPB, Area Mgr East (FS1/2/COTU/Seawater)" <GPBAreaMgrEastFS 12CS@BP.com >, "GPB, FS2 /COTU OTL" <GPBFS2OTL@bp.com >, "GPB, FS1 OTL:' <GPBFS1OTL@bptt klit" To: Steve McMains, AOGCC steve mcmains @admin.state.ak.us 907 - 793 -1241, fax 907-276-7542 From Hal Tucker, GPB Prod Optimization Team Leader Three extended flaring events occurred last week at Greater Prudhoe Bay. An extended flaring event occurred on April 16 at GC1 when the test bank flare controller was found to be set incorrectly. Flaring continued while operations personnel troubleshot their equipment. Flaring occurred from 1700 to 1920 (140 minutes), total volume flared was 1944 MSCF. FS1 experienced a planned flaring event on April 25 during the LPS turbine 1804 water wash. Flaring occurred from 0944 to 1046 (62 minutes), total volume flared was 258 MSCF. An extended, intermittent flaring event occurred at FS2 on April 25 when STV /IP turbine compressor 1802 shut down due to a controller /instrumentation failure associated with an electrical panel. Flaring occurred from 1435 to 1602 (87 minutes), total volume flared was 362 MSCF. If you require additional information, please don't hesitate to call me. Hal Tucker GPB Prod Optimization Team Leader (907) 659 -4472 1 of 1 4/26/2007 8:15 AM 1 Facility Number 0290000031 2. Facility Name 3 Field PBU - WOA 4. Operator BP 5. Mont /Year of Deposition May - 2007 al each pod as a percent of PBU GC 1 Disposition Volume MCF 20. For production from multiple pods, list contribution Total Volume 9 Sold 0 Pool Name Pool Code Percent 1 Reinjected 0 PRUDHOE 640150 94.1400 LISBURNE 640144 0.28% 6. Flared or 11 16 MIDNIGHT SUN 640158 0.67% FT MCINTYRE 640180 4.91% 9. Flared or vented more than 1 how (see instr.) 0 BOREALIS 640130 0.00% AURORA 640120 0.00% 10. Pilot and Purge 38,553 11. used for base operations (specily In Remarks) 906,618 12. Other (see inshuctcns) 0 "`. - • :� .. c-�,a. . "•` °u"° 'b` Safety MCF RECEIVED 13. TOTAL VOLUME (ITEMS .RECEIVED 946289 Lease Use MGF 14 NGL Gas Equivalent pp ,p1 -II1N L 7110/ 7 0 Conservation MCF 15. Purchased gas - Coin'' 1 0 Waste. MCF - - i" tearGaas 18. Transferrod frornr AnChO/191 0 Commissioner Date 17. Transferred to: (Express as a negative e) CGF - 70,863,826 18. Remarks. Block 11: Fuel Gas = 906,618 msct and Assist Gas = 0 msct I hereby certify that the foregoing is true and correct to the best of my knowledge. ` rp Title Manager, Production Taxes and Roy _ Cr te: All r 4. pale be corrected to pressure of f 1 14.85 5 and to a temperature of 60o F. Authority 20 AAC25.235. Signature / p Printed Name Bernard W. Hajny gone (907)564-50213 Date 6 1 Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate !Unplanned Events less than or equal to 1 hour 1 DATE 5/5/2007 5/11/2007 5/26/2007 TIME 0530 -0611 2055 -2144 1444 -1515 TOTAL VOLUME DESCRIPTION OF INCIDENT & CAUSE 410 Not required for unplanned events which 170 are less than or equal to 1 hour 538 1,118 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT May 2007 1 !Unplanned Events greater than 1 hour VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments DATE Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf 1 DATE . . 1 !Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments DATE TIME TOTAL TIME TOTAL TIME TOTAL Unplanned Events c 1 Hour Unplanned Events > 1 Hour Planned Events c 1 hour and not exceeding 5,000 MCF Planned Events • 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME 0 VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments 0 0 TOTAL 1,118 0 0 0 "..:". ".. 38,553 ttritagF&Ati 0! 39,671 , ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE See attachments ACTION TAKEN TO ELIMINATE CAUSE , See attachments ACTION TAKEN TO ELIMINATE CAUSE See attachments Page 1 6/13/2007 9:13 AM 1. Facility Number 0290000031 2. FaoeN Nam. psu GC 1 a Field la. a. Op.nlor 3. ManVJYw of Disposition (June -2007 PBU - WOA DIspwSbn Volume MCF ✓ 20. For production from multiple pons. Mat oonfrlw of ••ch pool as • percent of Total Volume e. Sold 0 Pool Name Pool Code Percent 7 Reiniecled 0 PRUDHOE 640150 94.32% LISBURNE 640144 0.32% S. Frrodwvenled l howw 398 ..7. MIDNIGHT SUN 640158 0.48% PT MCINTYRE 640180 4.90% 9. Flared or vented more n e th 1 how (re ktetr.) 2,634 BOREALIS 640130 0.00% AURORA 640120 0.00% m. Pea and Purge 37,031 ✓ / 11. Used for lase opinto8ef )� D ` 701,163 Auenrtaadon >1 Iv. z7Fi MCF other 12. O rue instructions) 0 JUL 2 3 2007 13. TOTAL VOLUME (ITEMS 6-12) 741,226 lame u.. MCF I. (1� � ��ae.a�ekr� ON & Gm Corr. Commission 14. NGL tpuvaell Andvaage 0 Carne.rnradan MCF 15. Putueed gas 0 wee: MCF 18. Transferred from: 0 ti& , ardr____ / '7 i 7 -° o t. 17. Transferred b: (Express ea • negative .) COF -50,447,074 19. Romar Block 11: Fuel Gas = 701,163 mac( and Assist Gas = 0 mscf 1 hereby certify that the Signature is and to the beat of my krn.Iedge. The Manager, Production Taxes and Royally Note: All volumes must be corrected to pressure of 14.85 psis and ut a city 20 AAC 5.35 F. Authority 241 AIkC2s.235. P PunsNan s Bernard W. Halny Ram (907)564 Cots _ .. 7 7 � 0 Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate 'Unplanned Events Tess than or equal to 1 DATE TIME „ VOLUME•„. 6/17/2007 1012 -1025 190 6/29/2007 2304-2310 208 TOTAL 'Unplanned Events greater than 1 hour 1 6/11/2007 6/19/2007 6121/2007 2019 -2230 0213 -0415 1340 -1559 TOTAL 398 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC - GAS FLARING INCIDENT REPORT June 2007 2,634 hour DESCRIPTION OF INCIDENT & CAUSE ,, �,,,,, ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which Not required tor unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour VOLUME. DESCRIPTION OF INCIDENT & CAUSE „ 1,365 See attachments 593 676 ,,,, ACTION TAKEN TO ELIMINATE CAUSE See attachments 'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf , DATE , TIME , „ VOLUME , DESCRIPTION OF INCIDENT & CAUSE,, ACTION TAKEN TO EUMINATE CAUSE, See attachments See attachments TOTAL 0 'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf 1 DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments TOTAL Unplanned Events < 1 Hour Unplanned Events > 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME 0 hi I TOTAL 398 2.634 0 0 40,063 ACTION TAKEN TO EUMINATE CAU$E See attachments 1 Page 1 7/5/2007 10:29 AM Flare Start Date 8/1/2007 Flare End Date 8/302007 Report System 07 -231 Flare Relief 07.245 Ram Relief 07 Flare Relief GC1 Flare Report Date Start Time Stop Time Duration Black Smoke Intermittent Planned Reported By Volume (mscf) 8/11/2007 8:19 :00 PM 10:30:00 PM 131 minutes No NO No BP11.1ACKSOMIM 1385 Determination Cause Amax shutdown due to level transmitter failure SOD C - bank and Annex Assumed pent Action Taken 6)19/2007 2:13:00 AM 4:15:00 AM 122 minutes No No NO BP1\MESSERTD 593 Determination Cause D-ped was S/D depressured for maint. work. No response was taken. Action Taken 6/21/2007 1:40:00 PM 3 PM 139 minutes No No No 8P1WESSERTD 678 Determination Cause LP compressor shut down because of high ambient temp. Swapped LP compressors. Action Taken Subject: GPB Gas Flaring Incident From: "GPB, Prod Opt TL" <GPBProdOptTL @BP.com> Date: Sat, 16 Jun 2007 16:05:20 -0800 To: steve_mcmains @admin.state.ak.us CC: "GPB, Environ TL" <GPBEnvironTL @BP.com >, "GPB, Environ Advisor East" <GPBEnvironAdvisorEast @ BP.com>, "GPB, Environ Advisor West" <GPBEnvironAdvisorWest @ BP.com>, "Fiedler, Anne M" <Anne.Fiedler @bp.com >, "Benson, Gary A" <Gary.Benson @bp.com >, "Pfeiffer, Jim A" <Jim.Pfeiffer @bp.com >, "Kurz, John" <john.kurz @bp.com >, "GPB, GC1 OTL" <GPBGC 1 OTL @bp.com>, "GPB, Area Mgr West (GC2/WRD)" <GPBAreaMgrWestGC2WRD @ BP.com>, "GPB, Area Mgr Central (GC1/3/FS3)" <GPBAreaMgrCentral @ BP.com>, "GPB, Area Mgr East (FS1 /2 /COTU /Seawater)" <GPBAreaMgrEastFS12CS @ BP.com>, "GPB, GC2 OTL" <gpbec2otl@BP.com >, "GPB, FSI OTL" <GPBFS 1 OTL @bp.com> To: Steve McMains, AOGCC steve mcmains @admin.state.ak.us 907 - 793 -1241, fax 907 - 276 -7542 From: Hal Tucker, GPB Prod Optimization Team Leader Extended flaring events occurred last week at Greater Prudhoe Bay at FS1, GC1 and GC2. The FS1 event occurred June 12 during plant restart operations. Flaring occurred until sufficient gas was brought into the plant to load up the compressors. Flaring occurred from 20:00 to 22:06 (126 minutes), total volume flared was 3499 MSCF. GC1 flared from 20:19 to 22:30 (131 minutes) on June 11. The flaring occurred when the Annex shut down due to a C -bank level transmitter failure. Total volume flared was 1365 MSCF. On June 11 GC2 flared for 18 minutes. However, the flared volume exceeded 5000 MSCF. This event occurred when both LPS turbine /compressors tripped to minimum during a process automation upset. The machines had to be manually reloaded to end the flaring event. Total volume flared was 6875 MSCF. If you require additional information, please don't hesitate to call me. Hal Tucker GPB Prod Optimization Team Leader (907) 659 -4472 1 of 1 6/18/2007 7:14 AM Subject: GPB Gas Flaring Incident From: "GPB, Prod Opt 11" <GPBProdOptTL @BP.com> Date: Toe, 19 Jun 2007 07:35:28 -0800 To: steve_mcmains @admin.state.ak.us CC: "GPB, Environ TL" <GPBEnvironTL @BP.com >, "GPB, Environ Advisor West" <GPBEnvironAdvisorWest @ BP.com>, "Fiedler, Anne M" <Anne.Fiedler @bp.com >, "Benson, Gary A" <Gary.Benson @bp.com >, "Pfeiffer, Jim A" <Iim.Pfeiffer@bp.com >, "Kurz, John" <john.kurz@bp.com >, "GPB, GC1 OTL" <GPBGCIOTL @bp.com >, "GPB, Area Mgr Central (GC 1 /3/FS3)" <GPBAreaMgrCentral @ BP.com> steve mcmainseadmin.state.ak.us 907- 276 -7542 Team Leader To: Steve McMains, AOGCC 907 - 793 -1241, fax From: Hal Tucker, GPB Prod Optimization An extended flaring event occurred at ad. on June 19. D -pad was shut down and de- pressured for planned maintenance. Flaring occurred from 02:13 to 04:15 (122 minutes), total volume flared was 593 MSCF. If you require additional information, please don't hesitate to call me. Hal Tucker GPB Prod Optimization Team Leader (907) 659 -4472 � ( 1 1 ( lI wmmail.dat i Content -Type: application /ms -tnef II U Content- Encoding: base64 I� 1 of 1 6/19/2007 7 46 AM I of I Subject: GPB Gas Flaring Incident From: "GPB, Prod Opt 11" <GPBProdOptTL @BP.com> Date: Fri, 22 Jun 2007 08:49:33 -0800 To: steve_mcmains@admin.state,ak.us CC: "GPB, Environ TL" <GPBEnvironTL@n BP.com>, "GPB, Environ Advisor East" <GPBEnvironAdvisorEast@BP.com>, "GPB, Environ Advisor West" <GPBEnvironAdvisorWest@BP.com>, "Fiedler, Anne M" <Anne.Fiedler @bp.com>, "Benson, Gary A" <Gary.Beuson@bp.com>, "Pfeiffer, Tim A" Vim.Pfeiffer @bp.com >, "Kurz, John" <john.kurz@bp.com>, "GPB, GCI 011" <GPBGCIOTL @bp.com >, "GPB, FSI 011" <GPBFSIOTL @bp.com >, "GPB, FS3 011" <GPBFS30TL @bp.com>, "GPB, GPMA OTL" <GPBGPMAOTL @bp.com>, "GPB, Area Mgr Central (GC 1/3/FS3)" <GPBAreaMgrCentral@BP.com>, "GPB, Area Mgr East (FSI /2/COTU /Seawater)" <GPBAreaMgrEastFS 12CS@BP.com >, "GPB, Area Mgr North (Gas Plants/GPMA)" <GPB_AreaMgrNorth@BP.com >, "GPB, Optimization Engr" <GPBOptimizationEngr@BP.com> steve mcmains @admin.state.ak.us 907 -276 -7542 Team Leader To: Steve McMains, AOGCC 907 - 793 -1241, fax From: Hal Tucker, GPB Prod Optimization Extended flaring events occurred at four GPB facilities on June 21 due to high ambient temperature (- 70 deg). The high ambient caused problems with the stability of the 2nd and 3rd stage compression at FS1, FS3, GC1 and GPMA. Flaring occurred as follows: FS1 14:59 to 16:00 (61 minutes), total volume flared was 2200 MSC£; FS3 09:15 to 12:35 (200 minutes, intermittent), total volume flared was 1154 MSCF; GC1 13:40 to 15:59 (139 minutes), total volume flared was 676 MSCF; GPMA 14:33 to 17:56 (203 minutes, intermittent), total volume flared was 38 MSCF. If you require additional information, please don't hesitate to call me. Hal Tucker GPB Prod Optimization Team Leader (907) 659 -4472 winmaiL44t Content -Type: application/ins-hid Content - Encoding: base64 6/22/2007 9:34 AM 1 Facility Number 0290000031 2 Facility Name PBU GC 1 3 Field PBU - WOA 4 Operator BP 5. Month/Year of Diepoution July -2007 Disposition Volume MCF 20. For production from multiple poets. Irst cont phonon of each pod as percent of Total Vdume 8. Sold 0 Pool Name Pod coos Percent 7 Reinjected 0 PRUDHOE 640150 93.61 °0 LISBURNE 640144 0.29% 8 Flared or vented I hour or less 555 MIDNIGHT SUN 640158 0.65 °,'e PT MCINTYRE 640180 5.45% 9 Flared or vented more than 1 hour (see Instr.) 6,185 / BOREALIS 640130 0.00% AURORA 640120 0.00% 10. Pilot am Purge 37,397 11. Used for lease operations (specify in Remarks) 821,788 12. Omer (see instructions) 0 Official Use Only .. Authorization >1 hr. Safety ' � I MCF 13. TOTAL VOLUME (ITEMS 6 -12) 865,925 Lease Use MCF 14. NGL Gas Equivalent 0 Conservation MCF 15. Purchased gas 0 Waste MCF 16. Transferred from 0 9 �/D to Commissioner Date 17. Transferred to: (Express as a negative a) CGF •55,418,170 t6. Romerks. Black 1 I: Fuel Gas = 821,788 mac( and Assist Csas= 0 msct 1 hereby certify that the f• ' • •mg is true and Con. • to the best of my knowledge. Signature /� vise Manager, Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 600 F. Authority 20 AAG25 235. Printed Name Bemard W. Hajny Phone (907)564-5028 Date ( Yy 07 Form 10-422 Rev. 1 /2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate `Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 7/13/2007 1336 -1423 555 Not required for unplanned events which are less than or equal to 1 hour (Unplanned Events greater than 1 hour TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 0930 -1045 208 See attachments 1553 -1716 1,153 1756 - 1938 779 2034 -0156 3,399 (two entries on flare reports) DATE 7/2/2007 7/13/2007 7/13/2007 7/13 - 14/2007 7/15/2007 1 !Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE DATE 1 !Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE DATE TOTAL 2039 - 2345 646 TOTAL TIME TOTAL TIME TOTAL 555 6,185 0 0 TOTAL Unplanned Events < 1 Hour 555 Unplanned Events > 1 Hour 6.185 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 37,397 Assist 0 TOTAL FLARED VOLUME 44,137 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC - GAS FLARING INCIDENT REPORT July 2007 See attachments See attachments ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments See attachments Page 1 8/9(2007 2:07 PM Flare Start Date 7/1/2007 Flare End Date 7/31/2007 Report System Date Start Time Stop Time Duration Black Smoke Intermittent Planned Reported By Volume (msct) 07-268 Flare Relief 7/2/2007 9:30:00 AM 10:45:00 AM 75 minutes No No No BPI \MOMAMD 208 • Determination Cause Dewatering 0T - 21 Ilowane Returned off gas to plant 07 -286 Flare Relief 07 -286 Flare Relief 07-286 Flare Relief 07 -289 Flare Relief Action Taken 7 3:53:00 PM 5:18:00 PM 83 minutes No No No BPIWAUGHNMO 1153 ✓ Determination Cause Annex and A -Bank shut down due to electrical power outage in skid 450 and 454. Action Taken GC1 Flare Report Flaring was permitted to continue while GC operations personnel attempted to troubleshoot power outage 7/13/2007 556:00 PM 7:38:00 PM 102 minutes No No No BP1 \VAUGHNMD 779 ✓ Determination Cause Annex and A -Bank shut down due to electrical power outage in skid 450 and 454. Action Taken Action Taken Flaring was permitted to continue while GC operations personnel attempted to troubleshoot power outage 7/13/2007 8:34:00 PM 12:00:00 AM 206 minutes No No No BPI \VAUGHNMD 2432 Determination Cause Annex and A - Bank shut down due to electrical power outage in skid 450 and 454. Flaring was permitted to continue while GC operations personnel attempted to troubleshoot power outage 7/14/2007 12:00:00 AM 1:58:00 AM 116 minutes No No No SP1\CLARKTL 967 ✓ Determination Cause During start up of GC the LP gas compressor would not load up due to low rate. Action Taken Continued to bring up rate until LP gas compressor had enough gas to load up. Flare Start Date 7/1/2007 Flare End Date 7/31/2007 Report System 07 -291 Flare Relief Date 7/15/2007 8 :39:00 PM Determination Cause Action Taken GC1 Flare Report Start Time Stop Time Duration Black Smoke Intermittent Planned 11:45:00 PM 186 minutes No No Test bank depressured to LP mode for LP testing. Flaring was permitted to continue while GC operations personnel depressured test bank and associated piping. No Reported By Volume (mscf) BPIICLARKTI. 646 ✓ McMains, Stephen E (DOA) From: GPB, Prod Opt TL (GPBProdOptTL@BP.coml Sent: Tuesday, July 03, 2007 9:09 AM To: McMains, Stephen E (DOA) Cc: GPB, Environ TL; GPB, Environ Advisor East; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, GC1 OTL; GPB, Area Mgr Central (GC1 /3 /FS3) Subject: GPB Gas Flaring Incident To: Steve McMains, AOGCC steve_mcmains@admin.state.ak.us 907- 793 -1241, fax 907 - 276 -7542 From: Dwight Warner, GPB Prod Optimization Team Leader Extended flaring events occurred at GC1 on July 2nd while dewatering the new oil transit line after hydro testing. This event occurred during the initial startup procedure and was corrected by moving flow to C- bank and returning off gas to the plant. Flaring occurred on 7/2/07 from 09:30 to 10:45 (75 minutes), total volume flared was 208 MSCF. If you require additional information, please don't hesitate to call me. Dwight Warner GPB Prod Optimization Team Leader (907) 659-4472 1 McMains, Stephen E (DOA) From: GPB, Prod Opt TL [GPBProdOptTL@BP.comj Sent: Sunday, July 15, 2007 5:06 PM To: McMains, Stephen E (DOA) Cc: GPB, Environ TL; GPB, Environ Advisor West; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, FS3 OTL; GPB, Area Mgr Central (GC1 /3 /FS3); GPB, Optimization Engr Subject: GPB Gas Flaring Incident To: Steve McMains, AOGCC steve_mcmains@admin.state.ak.us 907 -793 -1241, fax 907 - 276 -7542 From: Hal Tucker, GPB Prod Optimization Team Leader An extended flaring event occurred at GC1 on 7/13/07 when the inverter on the Uninterruptible Power Supply (UPS) system failed. When the inverter failed the majority of the plant shut down, the remaining production was insufficient to enable the LP compressor to remain loaded. Intermittent flaring occurred during the troubleshooting and restart process. Flaring ended when sufficient production was brought on to generate enough LP gas to enable the LP compressor to remain loaded. Intermittent flaring began on 7/13 at 1336 and ended at 0156 on 7/14 (12 hrs and 20 minutes), total volume flared was 5886 MSCF. If you require additional information, please don't hesitate to call me. Hal Tucker GPB Prod Optimization Team Leader (907) 6594472 1 McMains, Stephen E (DOA) From: GPB, Prod Opt TL [GPBProdOptTLQBP.com] Sent: Tuesday, July 17, 2007 9:41 AM To: McMains, Stephen E (DOA) Cc: GPB, Environ TL; GPB, Environ Advisor West; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, GC1 OTL; GPB, Area Mgr Central (GC1 /3 /FS3); GPB, Optimization Engr Subject: GPB Gas Flaring Incident To: Steve McMains, AOGCC steve_mcmains@admin.state.ak.us 907 -793 -1241, fax 907 - 276 -7542 From: Hal Tucker, GPB Prod Optimization Team Leader An extended flaring event occurred at GC1 on 7/15/07 when the test bank was changed from high pressure mode to low pressure mode. Concurrently, maintenance pigging operations were in progress resulting in an unusual valve configuration. De- pressuring the test bank and its associated piping took longer than normal under this configuration. Flaring began at 2039 and ended at 2345 (186 minutes), total volume flared was 646 MSCF. If you require additional information, please don't hesitate to call me. Hal Tucker GPB Prod Optimization Team Leader (907) 659 -4472 1 1 Facany Number 0290000031 2 Facility Marne PBU GC 1 3 FieIU PBU - WOA 4 Operator 8P 5. Month/Year of Disposition August -2007 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volxee. 6. Sold 0 Pool Name Pool Code Percent 7 Refnlecle0 0 PRUDHOE 640150 94,58% LISBURNE 640144 0.42% 8 Flared or vented 1 hour orless 0 MIDNIGHT SUN 640158 0.55% PT MCINTYRE 640180 4.45% 9 Flared or vented me man t hour (see rib) 271 v BOREALIS 640130 0.00% AURORA 640120 0.00% it Pilot and Purge 35,678 11. Used for lease operations (specify in Remarks) 652,428 12. Otter (see ins1ni os) 0 Official Use Only ;. Authorization >1 hr Safety Z7/ MCF 13. TOTAL VOLUME (ITEMS 6-12) 688,377 Lease Use MCF 14 NGL Gas Equivalent 0 Conservation MCF 15. Purchased gas 0 Waste. MCF 76. Transferred from: 0 i Co missiOner Date 17. Transferred to: (Express as a negative it COP - 59,542,667 18. Remarks. Mud 1 I: Fuel Gas c 652.428 meet and Aaunt Ga = 0 mscf I hereby certify mat the foregoing is tr - and .• ect to the best of my knowledge. Signature ,S& Tide — e Manager, Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Bernard W. Hajny Date 9 — /2 *- 47 Phone (907)564 -5028 Form 10 -422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate J 1 Unplanned Events less than or equal to 1 hour VOLUME DESCRIPTION OF INCIDENT & CAUSE Not required for unplanned events which are less than or equal to 1 hour DATE 8/25/2007 2204 -2359 DATE DATE Unplanned Events c 1 Hour Unplanned Events> 1 Hour TIME TOTAL TOTAL TIME TOTAL TIME TOTAL 0 1 'Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 271 See attachments 271 1 'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 0 1 'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments 0 TOTAL 0 271 Planned Events c 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 35,678 Assist 0 TOTAL FLARED VOLUME 35,949 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT August 2007 See attachments ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments ACTION TAKEN TO ELIMINATE CAUSE See attachments Page 9/12/2007 9:32 AM Flare Start Date 8/1/2007 Flare End Date 6/31/2007 Report System 07-345 Flare Relief GC1 Flare Report Date Start Time Stop Time Duration Black Smoke Intermittent Planned Reported By Volume (mscf) 8/25/2007 10:04:00 PM 11:5900 PM 115 minutes Yes No No SP7\HAVNESSS 271 Determination Cause V -120A flaring because of low gas rates due to taps proration. Not enough gas tor LP compressors to maintain forward flow. Action Taken No response taken as this was deemed to be of short duration. McMains, Stephen E (DOA) From: GPB, Prod Opt TL [GPBProdOptTL @BP.com] Sent: Sunday, August 26, 2007 8:45 AM To: McMains, Stephen E (DOA) Cc: GPB, Environ TL; GPB, Environ Advisor West; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Area Mgr Central (GC1131FS3); GPB, GC1 OTL Subject: GPB Gas Flaring Event To: Steve McMains, AOGCC steve_mcmains@admin.state.ak.us 907 -793 -1241, fax 907- 276 -7542 From: Dwight Warner, GPB Production Optimization Team Leader An extended flaring event occurred at GC1 on August 25. Flaring occurred on V -120A because of the low gas rates after TAPS initiated proration of 17% due to them having trouble getting the pipeline started after planned maintenance. Not enough gas was being produced for the LP compressors to be able to maintain forward flow. GC1 flaring event began at 22:04 and ended at 23:59 (115 minutes), with a total volume flared of 271 MSCF. If you require additional information, please don't hesitate to call me. Dwight Warner GPB Production Optimization TL (907) 659-5566 1 1 Faality Number 12 Facility Name 0290000031 I PBU GC 1 3 Field PBU - WOA 4. Operator BP 15. Month/Year of Disposition September -2007 Disposition Volume MCF / 20. For production Iron multiple pods, list contribution 01 each pool as a percent 01 Total Volume 6. Sold 0 Pool Name Pool Code Percent 7 flainlected 0 PRUDE'^` 640150 96.00% LISBURNE 640144 0.28% 8 Flared or vented l hour or les 6,687 ✓ MIDNIGH 640158 0.40% PT MCINTYRE 640180 3.32% 9 Fisted or vented more man 1 hour (see wise) 58 BORE, 640130 0.00% AURORA 640120 0.00% 10. Pilot and Purge 34,892 R. Used for lease operations (specify in Remarks) 534,762 12. Other oi er (see nstruons) 0 • - ... ..011b Ute Only Autflonzation >1 he Ufa y MCF 13. TOTAL VOLUME (ITEMS 6-12) 576,399 Lease Use MCF 14. NGL Gas Equivalent 0 Conservation MCF 15 Purchased gas 0 Wastte MCF 16. Transferred from: 0 �� \ / O /� / P 4- 1! Date ') Commissioner , Dew 17. Transferred to: (Express as a negative s) CGF -63, 517,514 / 18. Remarks: Black I I: Fuel Gas = 534,762 =eland and Assist Gas= 0 inset I hereby candy Mal the foregang is true and cerrect to the best of my knowledge. Signature Tine Manager, Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 pale and to a temperature of 60o F. Authority 20 AAC25.235. Footed Name Bernard W. airy Phone (907)5645028 Date 1 l L V r 0 Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate sue- 1 (Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 9/3/2007 1512 -1535 6,475 Not required for unplanned events which 9/19/2007 1021 -1038 212 are less than or equal to 1 hour TOTAL 1 (Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT 8 CAUSE 9/8/2007 1416 -1540 DATE DATE TOTAL TIME TOTAL TOTAL 6,687 58 See attachments 58 0 0 TOTAL Unplanned Events c 1 Hour 6,687 Unplanned Events > 1 Hour 58 Planned Events c 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 34,892 Assist 0 TOTAL FLARED VOLUME 41,637 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT September 2007 (Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf 1 VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments (Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcl 1 TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments ACTION TAKEN TO ELIMINATE CAUSE Not required tor unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE See attachments ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments Page 1 10/8/2007 1:58 PM Flare Start Date 9/1/2007 Flare End Date 9/30/2007 GC1 Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt SW Smoke Planned Reported By Volume (MSCF) 07374 Flare Relief 9/82007 2:16:00 PM 3:40:00 PM 84 minutes No No No BP1ICLARKTL Determination Cause Depressuing of V LDF from pad to GC. Action Taken Flaring was nesessary to depressure LDF to 0 psi for GC turnaround sateout 58 McMains, Stephen E (DOA) From: GPB, Prod Opt TL [GPBProdOptTL@BP.com] Sent; Wednesday, September 05, 2007 2:11 PM To: McMains, Stephen E (DOA) Cc: GPB, Environ TL; GPB, Environ Advisor East; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Area Mgr North (Gas Plants/GPMA); GPB, Gas Plants OTL; GPB, Environ Advisor West; GPB, Area Mgr East (FS1/2/COTU /Seawater); GPB, Area Mgr Central (GC1 /3 /FS3); GPB, Area Mgr West (GC2IWRD); GPB, FS1 OTL Subject: GPB Gas Flaring Event To: Steve McMains, AOGCC steve_mcmains@admh.state.ak.us 907- 793 -1241, fax 907- 276 -7542 From: Hal Tucker, GPB Production Optimization Team Leader An extended flaring event occurred across GPB on September 3. Flaring in excess of 5,000 MSCF occurred at CGF, FS1, GC1, GC2 and GC3 when CCP unexpectedly shut down two high stage compressors while "de- mobilizing" obsolete, turbine, control panels. During the de- mobilization process an incorrect wire was lifted, resulting in an ESD of two of the four high stage compressors. GPB shut in 2 MMMSCF /d of production to get out of flare. The following volumes were flared at each plant during the event: CGF 8,400; FS1 12,865; GC1 6,475; GC2 4,167; and GC3 6,771 (all volumes MSCF) . Flare duration was less than one hour at all facilities. If you require additional information, please don't hesitate to call me. Hal Tucker GPB Production Optimization TL (907) 659-4472 I Facility Number 0290000031 2. Facility Name I1 3 Fteo 4 Operator IBP 5. Month/Year d Disposition Is. PBU GC 1 PBU - WOA Disposition Volume MCF 20. For production from multiple pools, list contribution of each pod as a percent of Total Volume a Sold 0 Pool Name Pool Code Percent 7 Reinjected 0 PRUDHOE 640150 96.86% LISBURNE 640144 0.26% 8 Flared or vented 1 hour aless 10122 s' MIDNIGHT SUN 640158 0.32% PT MCINTYRE 640180 2.56% 1 hour man) w wee 2,424 v BOREALIS 640130 0.00% 9 Flared or vented more man 640120 0.00% 10. Rot and Purge 37,752 11. Used for lease operations (specify in Remarks) 705,834 12. Other (see instructions) o - - . .. . •.. Authorization >1 hr. Safety 2,424 MCF 13. TOTAL VOLUME (ITEMS 8-12) 756,132 Lease Use MCF 14. NGL Gas Equivalent 0 Conservation MCF 15. PrrOSseO gas 0 Waste MCF 16. Transferred from 0 /2 -ii-c 4141 miawrte� Date 17 Transferred to (Express as a negative 5) CGF -68,268,245 18. Remarks. Block 11: Fuel Gas = 105,834 msct and Assist Gas = 0 rnscf I hereby candy that me foregoing ,1J� is true and correct to the best of my knowledge. (� (' .,� / Ftrr Title Manager, Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 pale and to a temperature of 60o F. Authority 20 AAC25.235. signature /�T_ C .. Primed Name Bemard T' W. Hajny Phone a (907)56.4-5028 Date t ( ^— 1 ' 9 t - 1 Form 10 -422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPO OF PRODUCED GAS DISPOSITION Submit in Duplicate I (Unplanned Events Tess than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 10/21/2007 1025 -1116 9,846 Not required tor unplanned events which 10/25/2007 1537-1554 118 are less than or equal to 1 hour 10/29/2007 1643 -1652 125 10/30/2007 0944 -0950 12 10/30/2007 1126 -1136 21 TOTAL 10,122 1 (Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT 8 CAUSE 10/5/2007 1337-1501 875 See attachments 10/22/2007 0318 -0604 678 TOTAL 1 (Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments DATE TOTAL 10/5/2007 0715 -1742 T OT A L 1,553 0 871 TOTAL Unplanned Events < 1 Hour 10,122 Unplanned Events > 1 Hour 1,553 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 871 exceeding 5,000 MCF Pilot Purge 37,752 Assist 0 TOTAL FLARED VOLUME 50,298 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT October 2007 See attachments Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 871 See attachments ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE See attachments 1 ACTION TAKEN TO ELIMINATE CAUSE See attachments Page 1 11/6/2007 9:25 AM Flare Start Date 10/1/2007 Flare End Date 10/31/2007 GC1 Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration tntermiWnt Btk Smoke Planned Reported By Volume (MSCF) 07 -422 Flare Relief 10/52007 7.15:00 AM 5:42:00 PM 627 minutes Yes No Yes BPI UAESSERTD 871 Determination Cause Extended flaring event occured will depressuring flowline to repair PSV HAZOP items. Action Taken Flaring was permitted to continue while GC operations personnel attempted to repair PSV's. 07 - 422 Flare Relief 10/5/2007 1:37:00 PM 3:01:00 PM 84 minutes No No No BP1\MESSERTD 875 Determination Cause High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by 3 ° F. Action Taken WOA reduced production rates and shut -in 10 wells equaling 100 mmscid. Walls were shut -in or choked back starting at 1335 hours. 07 -462 Flare Relief 10/22/2007 3:18:00 AM 6:04:00 AM 166 minutes No No No BP14SUTTLEMR 678 Determination Cause Flaring Was due to copus spin to cod LPS compressor to maintenance Action Taken No response taken as this was deemed to be of short duration. Planned Maintenance McMains, Stephen E (DOA) From: GPB, Prod Opt TL (GPBProdOptTL ®BP.com] Sent: Saturday, October 06, 2007 2:38 PM To: McMains, Stephen E (DOA) Cc: GPB, Environ TL; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Environ Advisor West; GPB, Area Mgr West (GC2/WRD); GPB, GC2 OTL; GPB, Environ Advisor East; GPB, Area Mgr North (Gas Plants /GPMA); GPB, GPMA OTL; GPB, Area Mgr East (FS1121COTU!Seawater); GPB, FS2ICOTU OTL; GPB, Area Mgr Central (GC1 /3IFS3); GPB, GC1 OTL; GPB, FS1 OTL Subject: GPB Gas Flaring Events To Steve McMains, AOGCC steve_mcmainsitadmin.state.ak. us 907- 793 -1241, fax 907- 276 -7542 From: Hal Tucker, GPB Production Optimization Team Leader Multiple extended flaring events occurred at GPB during the last week. Two extended flaring events occurred at FS1 on 10/1 and 10/2 for planned maintenance on their LPS machines. On 10/1 LPS machine 1803 was shut down for water washing. Total duration was 20 hours and 19 minutes, total volume was 4,385 MSCF. The second event occurred on 10/2, for the same activity on 1804. Total duration was 14 hours and 28 minutes, total volume was 1,293 MSCF. FS2 water washed their LPS machine (1803) on 10/4. Total flare duration was 4 hours and 26 minutes, total volume was 924 MSCF. On 10/5, GC1 had two extended flaring events. The first event took place to de- pressure a flowline to make PSV repairs Total duration was 10 hours and 27 minutes of intermittent flaring which resulted in a total flared volume of 871 MSCF. A second event occurred when ambient temperatures increased. 100 MMSCF /d of production was cut to stop flaring. Total duration of this event was 84 minutes, total volume was 875 MSCF. The LPC facility flared for 97 minutes during the restart process following planned ESD safety system testing on 9/30. Total volume for this event was 97 MSCF. Extended flaring events occurred at GC2 on October 3, 4 and 5 during restart activities following a lengthy, planned, full plant turn- around. Flaring occurred off the LP compressor until sufficient rate was brought on to enable the LP machine to load up and remain loaded (common to all three events). Following the turn - around restart, GC2 was shut down for planned ESD testing, creating an additional extended flaring event. A summary of the flaring events follows: 10/3 Initial restart 21 hrs, 49 min 12,726 MSCF 10/34 Intermittent 22 hrs, 30 min 16,014 MSCF 10/5 Following ESD 8 hrs, 0 min 7,778 MSCF If you require additional information, please don't hesitate to call me. Hal Tucker GPB Production Optimization TL (907) 659 -4472 1 urn vas r Ruing c v ems McMains, Stephen E (DOA) From: GPB, Prod Opt TL (GPBProdOptTL62/BP.com] Sent: Tuesday, October 23, 2007 7:15 PM To: McMains, Stephen E (DOA) Cc: GPB, Environ TL; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Environ Advisor East; GPB, Environ Advisor West; GPB, Gas Plants OTL; GPB, Area Mgr North (Gas Plants/GPMA); GPB, GC1 OTL; GPB, Area Mgr Central (GC1 /3 /FS3) Subject: GPB Gas Flaring Events 10/24/2007 To: Steve McMains, AOGCC steve_mcmains@admin.state.ak.us 907 - 793 -1241, fax 907 - 276 -7542 From Dwight Wamer, GPB Production Optimization Team Leader If you require additional information, please don't hesitate to call me. Dwight Warner GPB Production Optimization TL (907) 659-5566 rage 1 ot 1 An extended flaring event occurred at GC1 on October 21st when CGF had both boosters shut down resulting in high transit line pressure which went to flare. The WOA flared off the annex wet gas flare valve. WOA reduced production rates and shut -in 13 wells (312 mmscfd). Flaring began at 10:25 and ended at 11:16 (51 minutes). Total volume flared was 9846 MSCF. An extended flaring event occurred at GC1 on October 22nd during copus spin cooling on LPS K -7001 compressor for maintenance. Flaring began at 03:18 and ended at 06:04 (166 minutes). Total volume flared was 678 MSCF. An extended flaring event occurred at CGF on October 20th when TIC -1855 shutdown for unplanned maintenance (rub on GG lube oil tine). This caused the stabilizer overhead to go to flare. The flare volume is estimated due to the totalizer not working. A work order has been written for repair. The tandem compressor was fully loaded, process changes were made to reduce flaring while the maintenance was performed. The unit was then repaired, restarted, and loaded. Flaring began at 10:42 and ended at 12:02 (80 minutes). Total volume flared was 2700 MSCF. 1. Facility Number 0290000031 12 Facility Name PBU GC 1 3. Field PBU - W OA 4. Operator BP 5. Month/Year of Disposition November - 2007 Disposition Volume MCF 20. For production from multiple pods. list contribution of each p001 as a percent of Total Volume 6. Sold 0 Pool Name Pool Code Percent 7 ReirNecled 0 PRUDHOE 640150 ' ' 96.85% LISBURNE 640144 0.21% 6. Flared or vented 1 trour or less 8,899 - MIDNIGHT SUN 640158 0.65% PT MCINTYRE 640180 2.29% 9. Flared or venter) more than 1 four (see Instr.) 1 BOREALIS 640130 0.00% AURORA 640120 0.00°! 10. Pilot and Purge 42,377 ,- 11. Used la lease operations (specify in Remarks) 740,996 12. Omer (see instructions) 0 . - . `. `�.. .. 'k� �m> S:•": riiaas Authorization >1 nr. �e Safety It7`q MCF 13. TOTAL VOLUME (ITEMS 6-12) 794,021 Lease Use MCF 14 NGL Gas Equivalent 0 Conservation MCF 15 Purchased pas 0 Waste MCF 16. Transferred front 0 / / - O Date (J 1T. Tronatened 1b. (E�ress as a negative a) CGF - 68 527 080 18. Remarks. Block I I: Fuel Gas = 740,996 Mad and Assist Gas = 0 mscf and c ed to me best of my knowledge. 1 hereby certify Mat the f owing is tNJ Tin Signature � �// �j e Manager. Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Bemard W. Hajny Phone (907)564 -5028 Date /„2 -� 2 -/s7 T' Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate • Unplanned Events less than or e DATE TIME 11/11/2007 0057 -0136 11/17/2007 1541 -1609 11/29/2007 1329 -1334 11/30/2007 1437 -1508 11/30/2007 1742 -1816 TOTAL ual to 1 hour VOLUME DESCRIPTION OF INCIDENT & CAUSE 812 Not required for unplanned events which 156 are less than or equal to 1 hour 56 6,458 1,417 8,899 (Unplanned Events greater than 1 hour DATE DATE DATE TIME TOTAL TIME TOTAL 11/2/2007 0049 -0438 TOTAL VOLUME 0 1 (Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 0 1 !Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 1,749 TOTAL Unplanned Events < 1 Hour 8,899 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events> 1 hour or 1,749 exceeding 5,000 MCF Pilot Purge > + *` >. 42,377 Assist Fi -n`:':1 TOTAL FLARED VOLUME 53,025 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT November 2007 DESCRIPTION OF INCIDENT & CAUSE See attachments See attachments 1,749 See attachments ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments See attachments Page 1 12/10/2007 1:41 PM Flare Start Date 11/12007 Flare End Date 11/30/2007 GC1 Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Bik Smoke Planned Reported By Volume (MSCF) 07 - 480 Flare Relief 11/2/2007 12:49:00 AM 4:38:00 AM 229 minutes No No Yes BP1\MESSERTD 1749 Determination Cause LPS compressor K - 7001 was shut down for maint Action Taken No response taken as this was to cool down turbine. McMains, Stephen E (DOA) From: GPB, Prod Opt TL [GPBProdOptTL @BP.com] Sent: Sunday, November 04, 2007 12:38 PM To: McMains, Stephen E (DOA) Cc: GPB, Environ TL; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Environ Advisor West; GPB, Environ Advisor East; GPB, Area Mgr Central (GC113 /FS3); GPB, GC1 OTL; GPB, Area Mgr East (FS1 /2 /COTU /Seawater); GPB, FS2 /COTU OTL Subject: GPB Gas Flaring Event To: Steve McMains, AOGCC steve_mcmains@admin.state.ak.us 907 -793 -1241, fax 907- 276 -7542 From: Hal Tucker, GPB Production Optimization Team Leader An extended flaring event occurred at GC1 on November 2nd to spin cool LPS turbine /compressor K7001 for combustion can repairs. Flare duration was 229 minutes. Total volume flared was 1749 MSCF. Two extended flaring events occurred at FS2 on October 31 and November 1 to facilitate flare system rupture disc replacement. The first event was to repair the flare system isolation valve and had a duration of 17 hours and 30 minutes with a total volume of 62 MSCF. The second event was replacement of the disc and had a duration of 17 hours and 39 minutes with a volume of 85 MSCF. Total volume for both events was 147 MSCF. If you require additional information, please don't hesitate to call me. Hal Tucker GPB Production Optimization TL (907) 659-4472 1 McMains, Stephen E (DOA) From: GPB, Prod Opt TL [GPBProdOptTL @BP.com] Sent: Saturday, December 01, 2007 1:03 PM To: McMains, Stephen E (DOA) Cc: GPB, Environ TL; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Environ Advisor East; GPB, Area Mgr Central (GC1 /3 /FS3); GPB, Area Mgr East (FS1 /2 /COTU /Seawater); GPB, Environ Advisor West; GPB, GC1 OTL; GPB, FS1 OTL Subject: GPB Gas Flaring Events To: Steve McMains, AOGCC sieve mcmains @admin.state.ak.us 907 -793 -1241, fax 907- 276 -7542 From. Hal Tucker, GPB Production Optimization Team Leader On 11/30/07 two flaring events occurred which exceeded the 5000 mscf reporting threshold. The events were caused by Toss of the CGF front end boosters due to a bad fuse on the fuel gas system. Loss of these boosters requires a gas cut of approximately 900 mmscfd. The flaring occurred at GC1 and FS1. GC1 flaring began at 1437 and ended at 1508 (31 minutes), with a total volume of 6458 mscf. FS1 flaring began at 1440 and ended at 1535 (55 minutes), with a total volume of 9548 mscf. If you require additional information, please don't hesitate to call me. Hal Tucker GPB Production Optimization TL (907) 659 - 5566/4472 1 1. Facility Number 0290000031 2. Facility Name PBU GC 1 3. Field 4. Operator BP 5. Month/Year of Disposition December -2007 PBU - WOA Disposition Volume MCF 20. For production front multiple pods, list contnbutIon of each pool as a percent of Total Volume O. Sold 0 Pool Name Pool Code Percent 7 Reelpctea 0 PRUDHOE 640150 97.42% 0.23/ LISBURNE 640144 8 Flared or vented 1 hour or less 39,374 MIDNIGHT SUN 640158 0.53% PT MCINTYRE 640180 1.82% 9. Flared or vented more than 1 hour (see est) 25,173 BOREALIS 640130 0.00°6 AURORA 640120 0.00; 10. Pilot and Purge 43,537 11. Used tor lease operations (specey in Remanu) 831,413 Authorization >1 hr. '3' /7 / MCF MC F 12. Other (see Instructions) ° 13. TOTAL VOLUME (ITEMS 6-12) 939,497 Lease Use MCF 14. NGL Gas Equivalent 0 Conservation MCF 15. PurOMsed gas 0 Waste MCF 18. Transferred front 0 te � ' /'� Com 1 si 17. Transferred to: (Express as a negative n CGF - 72,720,416 1 8. Remarks Block 11: Fuel Gas = 831,413 mscf and Assist Gas =0 newt' s m. 541— 10 u i Ltc,. 4-ttc 1 k r , F.l4w.:. *ew. Q &.446 -ct ec J 't'/ PvuX,- 0—vlv I hereby certify that the f ng is true and correct to the best of my knowledge. Signature / �� Tide Manager. Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235. Primal Name Bernard (( A7-5 d W. Hajny Phone (907)564 -5028 Date Form 10 -422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate 1 !Unplanned Events Tess than or equal to 1 hour TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ,,, ACTION TAKEN TO ELIMINATE CAUSE ,. 0705 -0737 689 Not required for unplanned events which Not required for unplanned events which 0856 -0910 116 are less than or equal to 1 hour are less than or equal to 1 hour DATE 12/1/2007 12/5/2007 12/5/2007 12/5/2007 12/7/2007 12/11/2007 12/11/2007 12/12/2007 12/13/2007 12/13/2007 12/14/2007 12/17/2007 12/17/2007 12/17/2007 12/17/2007 12/17/2007 12/19/2007 12/23/2007 12/24/2007 12/26/2007 DATE 12/7/2007 12/13/2007 DATE 1611 -1620 31 1936 -1950 1,138 0755 -0820 8,681 0010 -0056 128 1122 -1143 6,562 2035 -2051 278 0343 -0424 569 0800 -0846 169 2046 -2130 13,750 0114 -0118 364 1315 -1330 2,083 1530-1539 188 2011 -2029 2,362 2226 -2232 350 1500-1515 521 1342 -1359 354 0853 -0857 69 1934 -2014 972 TOTAL TIME 0820 -1104 1251 -1416 TOTAL TIME TOTAL 39,374 25,173 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC - GAS FLARING INCIDENT REPORT December 2007 !Unplanned Events greater than 1 hour 1 VOLUME DESCRIPTION OF INCIDENT & CAUSE 5,694 See attachments 19,479 1 !Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments 0 ACTION TAKEN TO ELIMINATE CAUSE „ See attachments ACTION TAKEN TO ELIMINATE CAUSE attachments Page 1 1/8/2008 1:50 PM 'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf VOLUME DESCRIPTION OF INCIDENT & CAUSE ... ACTION TAKEN TO ELIMINATE CAUSE, See attachments See attachments DATE TIME TOTAL 0 TOTAL Unplanned Events c 1 Hour 39,374 Unplanned Events > 1 Hour 25,173 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 43,537 Assist 1.1111211.11 TOTAL FLARED VOLUME 108,084 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT December 2007 Page 2 1/8/2008 1:50 PM Flare Start Date 12/1/2007 Flare End Date 12/31/2007 Time Of Flaring Report System Date Start Time Stop Time 07 - 540 Flare Relief 12/7/2007 8:20:00 AM 11:04:00 AM 164 minutes No Determination Cause Action Taken Action Taken GC1 Flare Report Duration Intermit'nt Blk Smoke Planned Reported By No No BP1 \MESSERTD LPS compressor K -7000 and K -7001 shut down due to a problem associated with electrical power. WOA reduced production rates and shut -in all LP wells equaling 550 mnscfd. Wells were shut -in or choked back starting at 0755 hours. 07 -559 Flare Relief 12/13/2007 12:51:00 AM 2:16:00 AM 85 minutes No No Determination Cause Extended flaring event occurred while awaiting GC operator/maintenance evaluation. Power outage blip, LPS compressors shut down. No BPI\JOHNSOMT WOA reduced production rates and shut -in or choked back 30 wells equaling 330 mmscfd. starting at 00:55 hours. Volume (MSCF) 5694 19479 McMains, Stephen E (DOA) From: Sent: To: Cc: Subject: To: Steve McMains, AOGCC steve_mcmains@admin.state. ak.us 907 -793 -1241, fax 907- 276 -7542 From Beverly Luedke -Chan, Field Optimization Engineer - on behalf of Hal Tucker, GPB Production Optimization Team Leader On December 7 beginning at 7:55 am, an extended flaring event happened at Prudhoe Bay. A power substation serving CCP went down, causing most of CCP and CGF to shut down. The gas transit line pressured up and all facilities feeding CCP and CGF went to flare (LPC was not affected). After being restored, the substation went down again. Here is a breakdown of flare volumes for each facility. Duration is total duration over both substation failures. CCP: CGF: FS1: FS2: FS3: GC1: GC2: GC3: 1,692 MSCF 55,658 MSCF 15,834 MSCF 140 MSCF 368 MSCF 14,375 MSCF 10,312 MSCF 8,600 MSCF Total volume: 106,979 MSCF. GPB, Optimization Engr (GPBOptimizationEngr @BP.com] Monday, December 10, 2007 3:08 PM GPB, Prod Opt TL; McMains, Stephen E (DOA) GPB, Environ TL; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Environ Advisor East; GPB, Area Mgr Central (GC1 /3 /FS3); GPB, FS3 OTL; GPB, Environ Advisor West; GPB, Area Mgr East (FS1 /2 /COTU /Seawater); GPB, Area Mgr North (Gas Plants /GPMA); GPB, Area Mgr West (GC2/WRD); GPB, Gas Plants OTL; GPB, FS1 OTL; GPB, FS3 OTL; GPB, GC1 OTL; GPB, GC2 OTL; GPB, GC3 OTL GPB Gas Flaring Event 45 min 7 hr 55 min (intermittent) 1 hr 38 min 14 min 45 min 3 hr 9 min 33 min 41 min Flaring began at 7:55 and was intermittent through as late as 20:00 at CGF, the last facility to be restored to power. CCP substation was washed that day. followed by CGF and the seawater plants. All substations are in the process of being washed again after the recent windstorm caused dirtying of the insulators from flying dirt/dust/gravel (not enough snow cover). If you require additional information, please don't hesitate to call me. Beverly Luedke -Chan GPB Field Optimization Engineer (907) 659 -4382 For Hal Tucker GPB Production Optimization TL (907) 659-4472 1 McMains, Stephen E (DOA) From: GPB, Prod Opt TL [GPBProdOptTL @BP.com] Sent: Saturday, December 15, 2007 9:13 AM To: McMains, Stephen E (DOA) Cc: GPB, Environ TL; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Environ Advisor East; GPB, Area Mgr Central (GC1 /3 /FS3); GPB, Environ Advisor West; GPB, Area Mgr East (FS1 /2 /COTU /Seawater); GPB, Area Mgr North (Gas Plants /GPMA); GPB, Area Mgr West (GC2/WRD); GPB, Gas Plants OTL; GPB, FS1 OTL; GPB, GC1 OTL; GPB, GC2 OTL; GPB, GC3 011 Subject: GPB Gas Flaring Event To: Steve McMains, AOGCC Steve mcmains @admin.state.ak.us 907 - 793 -1241, fax 907 - 276 -7542 From: Dwight Warner, GPB Production Optimization Team Leader On December 13 beginning at 00:12 am, an extended flaring event happened at Prudhoe Bay. The large dirt/contamination caused flashover that damagaed the CPS yard step -up transformer T -6 and caused the severe voltage sags and surges to go throughout the entire GPB power grid and shutdown numerous pieces of equipment at some of the facilities causing flaring. Shown below are the totals for each facility and the longest duration of any flaring event due to the outage at the respective facility. FS1: 86,656 MSCF 5 hr PC 1802, 1803 and 1804 flare reports GC1: 19,479 MSCF 85 min GC3: 892 MSCF 4 hr 17 min Total volume flared related to this event: 107,027 MSCF On December 14 beginning at 20:45 am, an extended flaring event happened at Prudhoe Bay. A substation at CCP /CGF surged /shorted which caused CGF to loose all power and the FS1 annex to shut down. This also resulted in flaring at some of the other facilities. CGF: 3,432 MSCF 58 min FS1: 13,750 MSCF 90 min 8125 MSCF 90 mire for shut -in of welts and loading 1803, 5625 MSCF 60 min due to annex shutdown OSD GC1: 13,750 MSCF 44 min compressors were not restarted until 23:07 GC2: 4,167 MSCF 16 min GC3: 9,456 MSCF 37 min Total volume flared related to this event: 44,255 MSCF If you require additional information, please don't hesitate to call me. Dwight Warner GPB Production Optimization TL (907) 659-5566/4472 1