HomeMy WebLinkAboutPBU GC 2 / BPSTATE OF ALASKA AOGCC GAS DISPOSITION FILES YEAR: 2007 FACILITY: PBU GC 2 OPERATOR: BP EXPLORATION 1. Facility Number 0290000032 Facility Name 12. Fa PBU GC 2 3. nod 1 Operator PBU • WOA IBP 5. Momonth/Year d Disposition eDisposition 15. Disposition Volume MCF 20. For production from multiple pools, get Contribution of each pod u • percent of Total Volume. 8. Sold 0 / Pod Name Pod Code Percent 7 Reinjected 0 PRUDHOE 640150 91.47% AURORA 640120 5.70% w o 8. Flared or vented 1hless 2,281 BOREALIS 640130 1.81% ORION 640135 0.65% 9. Flared or vented more than 1 moo (see from.) 8,005 ,/ POLARIS 640160 0.37% 10. Plot and Purge 23,878 ✓ ,1. Used for lease operations (specify in Remarks) 612,403 Authorization >1 tr. Safety S ool MCF 12. Omer (see klstnictioris) 0 13. TOTAL VOLUME (ITEMS 642) 646,567 Lease Use MCF 14. NGL Gas Equivalent 0 Conservation MCF 15. PurdlaseI gas 0 Waste' MCF 16. Transferred from: 0 �'� /W- 3 42 - 142 slomM Dale 17. Transferred to: (Express as a rlegathm e) CGF - 23,921,212 18. Remarks: Block l I : Fuel Gas = 612.403 mscf and Assist Gas = 0 mscf I hereby certify that the f is the and correct to of my knowledge. C his Manager, Production Taxes and Royalty Signature / '��' Note: All volumes must be corrected to pressure of 14.65 pale and ut a Authority 20 AAA of 35. F. AuthDrily zo AAC25.235. Printed Name Bernard W. Hajny Phone (907)5664 -502 8 Dale a �� — Q� Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION submit in Duplicate Unplanned Events less than or equal to 1 hour VOLUME DESCRIPTION OF INCIDENT 8 CAUSE 167 Not required for unplanned events which 75 are less than or equal to 1 hour 383 69 667 920 DATE 1/3/2007 1/4/2007 1/4/2007 1/17/2007 1/18/2007 1/19/2007 DATE 1/3/2007 1/4/2007 1/5/2007 1/7/2007 1/9/2007 1/19/2007 r DATE TIME 1312 - 1322 0635 -0641 0958 -1044 2355 -2359 00000048 0205-0258 TOTAL i 'Unplanned Events greater than 1 hour TIME 0708 -1140 1900-2043 0009 -0623 0911-1850 1335 -1709 0354 -0508 TOTAL TOTAL TOTAL Unplanned Events < 1 Hour Unplanned Everrts> 1 HOW Planned Events <1 hour and not exceeding 5,000 MCF Ptarned Events > 1 hna or exceeding 5000 MCF Pilot Purge Assist TOTAL FLARED VOLUME 2,281 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -2 GAS FLARING INCIDENT REPORT January 2007 -, VOLUME DESCRIPTION OF INCIDENT 8 CA 850 See Attachments 697 1,169 2,815 1,189 1,285 8,005 ACTION TAKEN TO ELIMINATE CAUSE ,... Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE,,,.,,, See Attachments 1 (Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf VOLUME,,, DESCRIPTION Of INCIDENT & CAUSE _ See Attachments 0 ACTION TAKEN TO ELIMINATE CAUSE „„„„ See Attachments (Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf TIME VOLUME, DESCRIPTION OF INCIDENT & CAUSE See Attachments 0 TOTAL 2281 8,005 0 0 NM nen 1•111111101F 34,164 ACTION TAKEN TO ELIMINATE CAUSE, n , ,,,„,„ a „„ ev See Attachments Paps 1 2/11/2007 259 PM Flare Start Date 1/1/2007 Flare End Date 1/31/2007 Report Time Of Flaring Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume (MSCF) 07 -3 Flare Relief 1/3/2007 7 AM 11 40 AM 272 minutes No No No BP1ICLARKTL 850 Determination Cause Sk. 18 LP compressor K -205 was shut down due to frozen discharge coder E-260. Ambient temperature 0 -36 degrees. Action Taken Action Taken GC2 Flare Report Flaring was permitted to continue while operations were troubleshooting E -260 cooler glychol valves to ensure tat glychol flow to cooler. Moved in two tioga heaters to direct heat to cooler bay to thaw frozen tubes. Tubes were thawed and K -206 LP compressor started and back on-line 0 1137 hrs. 07 -4 Flare Relief 1/4/2007 7:00:00 PM 10:43:00 PM 223 minutes No No No BPACOWANMM 697 Determination Cause LP Compressor K -205 surging due to discharge cooler partial freeze up. Action Taken Added more glychol heat and thawed out hydrates in discharge cooler. 07-6 Flare Relief 1/5/2007 12:09:00 AM 6:23:00 AM 374 minutes Yes No No BPICCLARKTL 1169 Determination Cause LP compressor shut down because of a problem associated with surging Action Taken Equipment returned to stable flow without recycle. 07-14 Flare Relief 1/7/2007 9:11:00 AM •50:00 PM 579 minutes No No No BP1WILLERGW 2815 Determination Cause White bringing production rates up following full plant D/D, LP coolers E -260) froze off preventing the starting of the LP compressor. Heater applied to coder bay and thaw job done. Flaring was permitted to continue while GC operations personnel attempted to restart the equipment. Cooler bay thawed and LP compressor started at 1848hrs. Flare Start Date 1/112007 Flare End Date 1/31/2007 Report Time Of Flaring Date Start Time Stop Time Duration Intermittent Black Smoke Planned 07 -17 Ram Relief 1/9/2007 135:00 PM 5:09:00 PM 214 minutes No Determination Cause Action Taken GC2 Flare Report 07 -37 Ram Relief 1/19/2007 3:54:00 AM 5:08:00 AM 74 minutes Yes No No Extended flaring event occurred due to proration due to leak on TAPS. LP compressors lost bite. Flaring was permitted to continue while GC operations personnel attempted to restart the equipment. Rate came back on after proration lifted after TAPS leak repaired. No No Determination Cause K -205 LP compressor lost its bite, due to fluctuating oil rases and temperature. Action Taken Flaking was permitted to continue white GC operations personnel attempted to reload LP compressor. Reported By Volume (AASCF) BPIWIIUERGW 1189 BP1UAAYAW 1285 GPB Gas Flaring Incident Subject: GPB Gas Flaring Incident • From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com> Date: Thu, 04 Jan 2007 06:16:46 -0900 To: steve_mcmains@admin.state.ak.us CC: "GPB, Environ TL" <GPBEnvironTL @BP.com >, "GPB, Environ Advisor West" <GPBEnvironAdvisorWest@BP.com >, "Fiedler, Anne M" <Anne.Fiedler @bp.com >, "Benson, Gary A" <Gary.Benson @bp.com >, "Pfeiffer, Jim A" <Jim.Pfeiffer@bp.com >, "GPB, GC2 Area Mgr" <GPBGC2TL a%BP.com >, "Kurz, Jobn" <jolm.kuiz @bp.com> To: Steve McMains, AOGCC steve_mcmains@admin.state.ak.us 907 - 793 -1241, fax 907 - 276 -7542 From: Hal Tucker, GPB Prod Optimization Team Leader An extended flaring event occurred at GPB on January 3, 2007. GC2 lost LP (3rd stage) compression when K205 was shut down due to a frozen discharge cooler. GC2 had a portable heater available and found a second portable heater that they could deploy to the frozen cooler. Both heaters were directed into the cooler bay to thaw the frozen cooler tubes. Total flare time during the thawing process was 4 hours and 32 minutes. Total flared volume flared was 850 MSCF. If you require additional information, please don't hesitate to call me. Hal Tucker GPB Prod Optimization Team Leader (907)- 659 -44 I of I I/42007 7:21 AM GPB Gas Flaring Incident Subject: GPB Gas Flaring Incident From: "GPB, Prod Opt TL" <GPBProdOptTL @BP.com> Date: Sat, 06 Jan 2007 09:29:43 -0900 To: steve_mcmains @admin.state.ak.us CC: "GPB, Environ TL" <GPBEnvironTL@BP.com >, "GPB, Environ Advisor West" <GPBEnvironAdvisorWest@BP.com >, "Fiedler, Anne M" <Anne.Fiedler@bp.com >, "Benson, Gary A" <Gary.Benson @bp.com >, "Pfeiffer, Jim A" <fim.Pfeiffer @bp.com >, "GPB, GC2 Area Mgr" <GPBGC2TL@BP.com5., "Kurz, John" <john.kurz @bp.com >, "GPB, GC1 Area Mgr" . t <GPBGC1TL@BP.coni, To: Steve McMains, AOGCC seve mcmains @admin.state.ak.us 907 - 793 -1241, fax 907- 276 -7542 From: Hal Tucker, GPB Prod Optimization Team Leader Two extended flaring events occurred at GPB on January 4, 2007. GC2 lost LP (3rd stage) compression when K205 began surging due to a partially frozen discharge cooler. Glycol heating was increased to thaw suspected hydrates in the cooler. Total flare time was 3 hours and 43 minutes. Total flared volume flared was 697 MSCF. The second January 4 flaring event occurred at GC1 when a slight pressure increase was noted on the flare header. The flare header pressure returned to normal (indicating that flaring had stopped) prior to operations identifying the cause of the increased pressure. Total flare time was 4 hours and 10 minutes. Total flared volume flared was 434 MSCF. If you require additional information, please don't hesitate to call me. Hal Tucker GPB Prod Optimization Team Leader (907) - 659 -44 1 oft 1/8120078:19 GPB Gas Flaring Incident Subject: GPB Gas Flaring Incident From: "GPB, Prod Opt TL" <GPBProdOptTL @BP.com> Date: Wed, 10 Jan 2007 21:23:41 -0900 To: steve_mcmains @admin.state.ak.us CC: "GPB, Environ TL" <GPBEnvironTL @BP.com >, "GPB, Environ Advisor West" <GPBEnvironAdvisorWest@BP.com >, "Fiedler, Anne M" <Anne.Fiedler@BP.com >, "Benson, Gary A" <Gary.Benson @BP.com >, "Pfeiffer, Jim A" <Jim.Pfeiffer@BP.com>, "GPB, GC2 Area Mgr" <GPBGC2TL@BP.com >, "Kurz, John" <john.kurz @BP.com>, "GPB, GC2 AMS" IFGPBGC2AMS@BP.COM>5 To: Steve McMains, AOGCC steve_mcmains@admin.state.ak.us 907- 793 -1241, fax 907 - 276 -7542 From: Michael Bolkovatz, GPB Prod Optimization Team Leader An extended flaring events occurred at GPB on January 9, 2007. North Slope production was curtailed to 35% due to a leak on the Trans Alaska Pipeline. As a result of this decrease, the GC2 LP compressors would not stay loaded due to insufficient suction gas. The facility remained on production (the ambient temperature was -25 to -30 deg) while the LP gas was flared. Total flare time was 3 hours and 34 minutes. Total flared volume flared was 1189 MSCF. If you require additional information, please don't hesitate to call me. Michael Bolkovatz GPB Prod Optimization Team Leader (907) 659 -5566 I of I/11/2007 8:04 AM 1 Facility Number 0290000032 2 Facility Name PBU GC 2 3. FIOId 4 Operator 15 Month/Year 01 Disposition BP February PBU - WOA Disposition Volume MCF 20. For production from multiple pods, list cont bution of each pod as a percent 01 Total Volume 8 Said 0 Pod Name Pool Code Percent 7 Reinjected 0 PRUDHOE 640150 92.95% AURORA 640120 4.27% 1 h 8. Flared or vented our or Ins 948 BOREALIS 640130 1.69% ORION 640135 0.77% m 9. Flared or vented more an 1 hour (see Instr.) 0 POLARIS 640160 0.32% 10. Pkot and Purge 22,522 11. Used Mr lease operations {specify „Remarks) 588,325 12. Other (see instructions) 0 7. `, ., • : -a_ :. atosiisocor a cr .• `" • ` n . •.e 4,- Authorization >1 hr. Safe h MCF 13. TOTAL VOLUME (ITEMS 6-12) 611,795 Lease Use MCF 14. NGL Gas Equivalent 0 Conservation MCF 15. Purchased gas 0 Waste: MCF 18. Transferred from: 0 Commissioner Deb 17. Transferred to: (Express as a negative t) CGF - 23,054,379 1 8 . Rernarks. Block 1 1 : Fuel Gas = 588,325 disci and Assist Gas = 0 nlscf I hereby certify mat the foregoing is true and to best d my knowledge. //� Slgnatlxe/ / Tolle Manager, Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 psla and to a temperature of 60o F. Authority 20 AAC25235. f' G Printed Name Bernard W. Hajny Phone 007)564-5028 DatuL,J �7 -eJ Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate 1 !Unplanned Events less than or equal to 1 hour VOLUME , DESCRIPTION OF INCIDENT & CAUSE 113 Not required for unplanned events which 792 are less than or equal to 1 hour 35 8 fr DATE _ 2/4/2007 2/12/2007 2/24/2007 2/25/2007 1 !Unplanned Events greater than 1 hour VOLUME,_ DESCRIPTION OF INCIDENT & CAUSE See Attachments DATE,, ., 1 !Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf VOLUME _ DESCRIPTION OF INCIDENT & CAUSE _.. , ACTION TAKEN TO ELIMINATE CAUSE, See Attachments See Attachments „. DATE, 1 !Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf VOLUME. - ,. DESCRIPTION OF INCIDENT & CAUSE See Attachments DATE, __ Unplanned Events < 1 Hour Unplanned Events > 1 Hour TIME 1917 -1927 1806 -1844 1803 -1813 1844 -1850 TOTAL TOTAL TOTAL TIME TOTAL 948 0 0 0 TOTAL 948 0 Planned Events c 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Not Purge 22.5721 Assist Oen Oi TOTAL FLARED VOLUME _ 23,470 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -2 GAS FLARING INCIDENT REPORT February 2007 ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE, See Attachments ACTION TAKEN TO ELIMINATE CAUSE t yE �b,. ; ;, : ,.,_ See Attachments Page 1 315/2007 3:38 PM 1 Facility Number 0290000032 2 Facility Name PBU GC 2 3 Field PBU - WOA A. Operator BP 5 Month/Year of Disposition March - 2007 Disposition Volume MCF 20 For product.on from multiple pods. list Cont ibution of each pool as a percent ot Total Volume 6. SOW 0 Pool Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 92.44% AURORA 640120 4.50% 8. Flared or vented 1 hour or lass 757 BOREALIS 640130 1.61% ORION 640135 0.97% th l aw (see net) 0 POLARIS 640160 0.48% 9. Fared or vented more than 10. Pilot and Purge 28,931 11. Used for lease operations (specify in Remarks) 670,172 12. Omer (see etshuatlons) 0 -�- ����� 1..v..• ' —.. ���}}. +�"`+�'. 4 ' •1 isWO rl}S' A umonzation >1 hr. Safe y MCF 13. TOTAL VOLUME (ITEMS 6-12) 699,860 Lease Use MCF 14. NGL Gas Equivalent 0 Conservation MCF 15. Purchased gas 0 Waste MCF 18. Transferred front 0 Commissioner Dab 17. Transferred to: (Express as a negative try CGF - 25,746,234 18. Remarks. Block 11: Fuel Gas = 670,172 mscf and Assist Gas = 0 mscf 1 hereby certify that the for :.. ng is true and Corr. - t. the best of my knowledge. Signature _ _ _ / ` Tide Manager, Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 pale and to a temperature of 600 F. Authority 20 AAC25.235. Printed Name Bemard W. Hajny Phone (907)564-5028 Date Y --- -d7 Form 10 -422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate 'Unplanned Events less than or equal to 1 hour 1 DATE 3/2/2007 3/8/2007 3/14/2007 TIME 1123 -1130 2159 -2229 1235 -1255 TOTAL 'Unplanned Events greater than 1 hour 1 DATE > TIME VOLUME Assist TOTAL. FLARED VOLUME TOTAL ,Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf 1 DATE - TIME VOLUME TOTAL 'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf 1 DATE TIME ,. TOTAL Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge VOLUME DESCRIPTION OF INCIDENT & CAUSE 97 Not required for unplanned events which 521 are less than or equal to 1 hour 139 VOLUME, 757 TOTAL 0 0 0 757 0 0 0 ory a 29,931 29,688 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-2 GAS FLARING INCIDENT REPORT March 2007 DESCRIPTION OF INCIDENT & CAUSE See Attachments DESCRIPTION OF INCIDENT & CAUSE See Attachments DESCRIPTION OF INCIDENT & CAUSE See Attachments ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO EUMINATE CAUSE See Attachments ACTION TAKEN TO ELIMINATE CAUSE See Attachments ACTION TAKEN TO ELIMINATE CAUSE See Attachments F'age 1 4/5/2007 9:43 AM 1. Facilay Number 0290000032 2. Facility Name PBU GC 2 3 Field PBU - WOA 4 Operator BP 5. Month/Year of Disposition April -2007 Disposition Volume MCF ete / 20. For production from multiple pools. list contribution ol each pool as a percent of Tot Volume s. Sold 0 Pool Name Pool Code Percent T Reinjected 0 PRUDHOE 640150 91.27% AURORA 640120 5.44% 8 Flared or vented 1 hour or less 1 929 BOREALIS 640130 1.98% ORION 640135 0.83% 9 Flared or than more an 1 her (see Instr.) 42,376 1 / POLARIS 640160 0.48% 10. Pilot and Purge 23,383 11. Used for lease operations (specify in Remarks) 490,686 - - Authorization >l hr • • r 1 -: - rr Safety • ' Y -r .. lZ � ; � � MCF 12. Other (988 Y1411lotfdns) 0 13. TOTAL VOLUME (ITEMS S -12) 558,374 Lease Use MCF 14. NGL Gas Equivalent 0 Conservation MCF 15. Purchased gas 0 Waste MCF 16. Translated Iran: 0 J~ ‘43-0 7 i i Date 17. Transferred to (Ewes!' as a negative 5) C - 18,046,761 18. Remarks. Block 1 L Fuel Gas = 490,686 tnscf and Assist Gas = 0 mscf I hereby certify mat the f ng is We and correct to the best of my knowledge. / retie Manager, Production Taxes and Royalty Note: AB volumes must be corrected to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 AAC25.235. Signature Primed Name Bernard W. Hajny Phone (967)564 -5026 Date r `/ U Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate (Unplanned Events less than or equal to 1 hour 1 DATE 4/1/2007 4/2/2007 4/2/2007 4/2'2007 4/2/2007 4/3/2007 4/7/2007 4/9/2007 4/14/2007 4/30/2007 DATE 4/24/07 - 4/30/07 DATE Unplanned Events < 1 Hear Unplamed Events >1 hour Planted Events < 1 hour and not exceeding 5,060 MCF TIME 1747 -1845 0717 -0724 0759 -0807 0821 -0835 1330 -1339 1757 - 1821 1955 -2043 1039 -1056 2004 -2010 0522 -0529 TOTAL (Unplanned Events greater than 1 hour 1 TIME 2230-0317 TOTAL TOTAL TIME TOTAL VOLUME DESCRIPTION OF INCIDENT & CAUSE 450 Not required for unplanned events which 58 are less than or equal to 1 hour 83 146 62 200 800 83 23 24 1,929 VOLUME DESCRIPTION OF INCIDENT & CAUSE 42,376 See Attachments 42,376 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See Attachments 0 VOLUME DESCRIPTION OF INCIDENT & CAUSE See Attachments 0 TOTAL 1,929 42,376 0 Planned Events > 1 hew or 0 exceeding 5,000 MCF Pilot Purge Assist ; - 0 TOTAL FLARED VOLUME 67,688 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT- GC -2 GAS FLARING INCIDENT REPORT Apr(I 2007 ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE See Attachments ACTION TAKEN TO ELIMINATE CAUSE See Attachments Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf ACTION TAKEN TO ELIMINATE CAUSE,. ,., See Attachments Pegs l 6/8 1050 AM Flare Start Date 4/1/2007 Flare End Date 4/30/2007 Time 01 Flaring Report Number Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume (MSCF) 07-164 Flare Relief 4/24/2007 10:30:00 PM 12 :00:00 AM 90 minutes No No No BPI\CLARKTL 138 Determination Cause GC -2 is shut down and vent gas dower is in operation to keep sweep on produced water tanks. Action Taken 07 -163 Flare Relief 4/25/2007 12:00:00 AM 12:00:00 AM 1440 minutes No No No BP1\CLARKTL Determination Cause GC -2 is shut down and vent gas blower is in operation to keep sweep on produced water tanks. Action Taken 07 -162 Flare Relief 4/26/2007 12:00:00 AM 12:00:00 AM 1440 minutes No No No BP1\CLARKTL Determination Cause GC - is shut down and vent gas blower is in operation to keep sweep on produced water tanks. Action Taken GC2 Flare Report Flaring was permitted to continue while GC was shut down. 0 vent gas blower is not in operation then produced water tanks vent to atmosphere. Flaring was permitted to continue while GC was shut down. If vent gas blower is not in operation then produced water tanks vent to atmosphere. Flaring was permitted to continue while GC is shut down. If vent gas blower is not in operation then produced water tanks vent to atmosphere. 07 -165 Flare Relief 4/27/2007 12:00:00 AM 12:00:00 AM 1440 minutes No No No BP1 \CLARKTL 2200 Determination Cause GC -2 is shut down and vent gas blower is in operation to keep sweep on produced water tanks. Action Taken 07 -167 Flare Relief 4/28/2007 12:00:00 AM 12:00:00 AM 1440 minutes No Flaring was permitted to continue while GC is shut down. If vent gas dower is not in operation then produced water tanks vent to atmosphere. No No BP1 \CLARKTL Determination Cause GC is in the process of start up. Not enough gas to operate IPA-P compressors. Action Taken Flaring was permitted to continue while GC operations personnel are starting up. 2200 2200 13780 Flare Start Date 4/1/2007 Flare End Date 4/30/2007 GC2 Flare Report Time Of Flaring Report Number Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume (MSCF) 07-168 Flare Relief 4/29 /2007 12:00:00 AM 8:30:00 PM 1230 minutes No No No BP1UACKSOWM 21000 Determination Cause GC is In the process of start up. Not enough gas to operate IP/LP compressors. Assist gas added to prevent black smoke. Action Taken Flaring was permitted to continue while GC operations personnel attempted to restart the equipment 07 -168 Flare Relief 4/29/2007 8:30:00 PM 12:00:00 AM 210 minutes Yes No No BPIUACKSOWM Determination Cause LP compressor surged and discharged to Aare due to low LP gas rate Action Taken Operator reloaded machine 07 -170 Flare Relief 4/30/2007 12:01:00 AM 3:17:00 AM 196 minutes Yes Determination Cause LP compressor was surging because of low gas rate during GC-2 start uR Action Taken Plant operator was trying to toad compressor. 450 No No BPi\MESSERTD 408 1 Facility Number 0290000032 2 Facility Name 3. Field P8U - WOA 4 Operator BP 15. MonWVYsar of DisposiZon May - 2007 PEW GC 2 Disposition Volume MCF ✓ ", tee" 20. For production from multiple pods. list contribution of each pool as a percent of Total VOhme e. Sold 0 Pool Name Pool Code Percent 7 Reetjacted 0 PRUDHOE 640150 91.27 °b AURORA 640120 5.44% 8. Flared or vented 1 hour or less 1,077 BOREALIS 640130 1.98% ORION 640135 0.83% 9. Flared or vented more than 1 hour (see instr.) 34,370 POLARIS 640160 0.48% 10. Pilot rot Purge 26,242 11. Used for lease operations (specify Si Remarks) 549,497 Authorisation . , �� ; 12. Other (see instructional RECEIV ED Q >1 hr Safety 54t37o MCF 13. TOTAL VOLUME (ITEMS 6-12) JUN 2 2 2001 611,188 Lease Use McF 14. NGL Gas Equivalent 0 Conservation MCF 15. Purchased gas Alaska «� ry^^ 011 i11 0 Waste. MCF 0 /l Commissioner Date 18. Transferred from 17. Transferred o: (Express as a negative 0) COP - 19,991,732 18. Remarks. Block 1 1 : Fuel Gas= 549.497 rntcf and Assist Gas = 0 otscf i hereby certify that the foregoing is true and correct to the best of my knowledge. /�,, /� sprwtue (TL( ,s." t �,n..A - rye Title Manager, Production Taxes and Ro ally Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 AAC25.235. ' — T Printed Name Bemard W. Hajny Alone (907)564 - 5028 Date 6 f I 0 7 Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate 382- I 'Unplanned Events less than or equal to 1 hour DATE - VOLUME DESCRIPTION OF INCIDENT & CAUSE 5/13/2007 208 Not required for unplanned events which 5/15/2007 194 are less than or equal to 1 hour 5117/2007 37 5/20/2007 39 5/20/2007 39 5/21 /2007 521 5/25/2007 39 'Unplanned Events greater than 1 hour TIME 1331 -1745 1745-2059 0305 -1339 TOTAL DATE 5/20/2007 5/20/2007 5/21-25/2007 DATE DATE Unplanned Events < 1 Hour Unplanned Events > 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME TIME 1150 -1205 1520 -1530 1110-1120 1400 -1408 1423 -1431 0215 -0305 1453 -1510 TOTAL TIME TOTAL TIME TOTAL VOLUME 1,077 1 VOLUME DESCRIPTION OF INCIDENT & CAUSE 1,526 See Attachments 539 32,305 34,370 1 !Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DESCRIPTION OF INCIDENT 8 CAUSE See Attachments 0 1 'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf VOLUME DESCRIPTION OF INCIDENT & CAUSE See Attachments 0 TOTAL 1,077 34,370 0 0 . t:n 26,242 0 81,689 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -2 GAS RARING INCIDENT REPORT May 2007 ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE See Attachments ACTION TAKEN TO ELIMINATE CAUSE See Attachments ACTION TAKEN TO ELIMINATE CAUSE See Attachments Pegs 1 6/13/2007 9:13 AM Flare Start Date 5/1/2007 Flare End Date 531/2037 Report Number Date System 07 -198 Flare Relief 07 -198 Flare Relief / 07 -199 Flare Relief 07 -201 Flare Relief 07 -203 Flare Relief GC2 Flare Report Time Of Flaring Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By 5/20/2007 1:31:00 PM 5:45:00 PM 254 minutes No Determination Cause GC experienced a Master Gas shut down (Stop Production) while FCO crew was working in sk. 18 electrical panel. Action Taken Equipment was restarted at 1645 hours. 5/20/2007 5:45:00 PM 8:59:00 PM 194 minutes No Determination Cause LP compressor recycling due to unstable gas rate during start up. Action Taken WOA continued bringing production rates up to stabilize gas to compressor. 5/21/2007 3:05:00 AM 12:00:00 AM 1255 minutes No Determination Cause GC Shut down due to leak in produced water line from slug catchers to skin tanks. Increased sweep gas through skim and surge tanks to keep them from venting to atmosphere. Added assist gas to keep Action Taken mares burning clean. 5/22/2007 120000 AM 12:00:00 AM 1440 minutes Determination Cause Action Taken No No BP1\CIARKTL No No BPI \CLARKTL No No BP1\VAUGHNMD Flaring was permitted to continue while GC operations personnel safe out and repair produced water lint No No No BP:ICLARKTL GC Shut down due to leak Si produced water line from slug catchers to skin tanks. Increased sweep gas through skim and surge tanks to keep them from venting to atmosphere. Added assist gas to keep flares burning clean. Flaring was permitted to continue while GC operations personnel sated out and repaired produced water line. 5/23/2007 12:00:00 AM 12:00:00 AM 1440 minutes No No No BPI \MESSERTD Determination Cause GC Shut down due to leak in produced water line from slug catchers to skin tanks. Increased sweep gas through skim and surge tanks to keep them from venting to atmosphere. Added assist gas to keep Action Taken flares burning clean. Flaring was permitted to continue while GC operations personnel sated out and repaired produced water line. Volume (MSCF) 1526 539 6101 7000 7000 1 Flare Start Date 5/ Flare End Date 5/31/2007 GC2 Flare Report Time Of Flaring Report Number Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume (MSCF) System 07 -206 Flare Relief 5/24/2007 12:00:00 AM 12:00:00 AM 1440 minutes No No No BP1'MESSERTD 7000 Determination Cause GC Shut down due to leak in produced water line from slug catchers to skim tanks. Increased sweep gas through skim and surge tanks to keep them Fran venting to atmosphere. Added assist gas to keep Action Taken flares bumng dean. - 07-207 Flare Relief 5/25/2007 12 :00:00 AM 1:39:00 PM 819 minutes No Flaring was permitted to continue while GC operations personnel sated out and repaired produced water line. No No BP1 \CLARKTL Determination Cause GC Shut down due to leak in produced water line from slug catchers to skin tanks. Increased sweep gas through skim and surge tanks to keep them from venting to atmosphere. Added assist gas to keep Action Taken flares burning dean. Flaring was permitted to continue while GC operations personnel repaired produced water line. GC started ramping up at 0430 hrs. IP gas compressor started at 1100 hrs. LP compressor started at 1330 hrs. 5204 GPB Gas Flaring Incident Subject: GPB Gas Flaring Incident From: "GPB, Prod Opt TL" <GPBProdOptTL @BP.com> Date: Tue, 01 May 2007 08:11:55 -0800 To: steve_mcmains @admin.state.ak.us CC: "GPB, Environ TL" <GPBEnvironTL@BP.com>, "GPB, Environ Advisor West" <GPBEnvironAdvisorWest @BP.com >, "Fiedler, Anne M" <Anne.Fiedler @bp.com >, "Benson, A" <Gary.Benson @bp.com >, "Pfeiffer, Jim A" <Jim.Pfeiffer @bp.com >, "Kurz, John" <john.kurz @bp.com >, "GPB, GC2 OTL" <gpbec2otl@BP.com >, "GPB, Area Mgr West (GC2/WRD)' <GPBAYeaMgrWestGC WRD@BP.cbms To: Steve McMains, AOGCC steve mcmains @admin.state.ak.us 907 -793 -1241, fax 907 - 276 -7542 From: Hal Tucker, GPB Prod Optimization Team Leader An extended flaring event occurred at GC2. This event was initiated when GC2 unexpectedly shut down at approximately 14:00 on April 23 when a side boom struck an electric line causing immediate loss of power at GC2. The flaring event began on April 24 at 22:30 when produced water was brought into the plant from GC1 to maintain flow in the GC2 produced water system to prevent flowline freezing. Flaring the produced water sweep gas continued until approximately 01:30 on April 28 at 2,200 MSCF per day. Duration of that portion of the event was approximately 75 hours, with a cumulative volume of less than 7,000 MSCF. At 01:30 an April 28, a small number of non gas lifted wells were brought on to prevent large diameter flowlines from freezing. This initiated the plant restart process. Flaring increased to approximately 20,000 MSCF per day at this time and continued for approximately 43 hours until the IP compressor was loaded up. Cumulative volume for this portion of the event was approximately 34,000 MSCF. Flaring then continued at approximately 3,000 MSCF per day until enough oil rate could be established to load up the LP machine at 05:29 on April 30. Total volume flared for the entire event was 42,400 MSCF. Total duration was 124 hours and 53 minutes. The manner in which the GC went down, a longer than normal pre - start-up review was required to ensure a safe plant restart. Given the timing of the likely restart, it was decided to begin corrosion inspections on the WOA gas lift transit line since GC2 was already down. These inspections needed to be completed prior to the spring thaw since several locations are over water. The gas lift line was shut down for inspection at 23:30 on April 24. During the inspections, the wind increased to phase II conditions which hampered the timely completion of the gas lift line inspections. Because of the unexpected shut down duration, production line freezing became a concern and the decision was made to begin restarting the GC as soon as the inspections were completed, even though work on B -bank had not yet been completed. Flow was established with non gas lifted wells in each large diameter flowline at approximately 01:30 on April 28, gas lift was restarted at 11:00 that same day. Due to a slow and deliberate plant restart, continuous flaring occurred until 20:30 on April 29 when enough oil rate was on line to attempt to load the IP and LP compressors. After 20:30 hours oil rates were not high enough nor stable enough to prevent intermittent flaring. At 05:29 on April 30, sufficient oil rate was established to keep the IP and LP machines continuously loaded and 4 oft 5/1/2007 8:15 AM GPB Gas Flaring Incident • 2 of 2 end the flaring event If you require additional information, please don't hesitate to call me. Hal Tucker GPB Prod Optimization Team Leader (907) 659-4472 5/1/2007 8:15 AM GPB Uncontrolled Release Subject: GPB Uncontrolled Release From: "GPB, Prod Opt TL" <GPBProdOptTL @BP.com> Date: Mon, 21 May 2007 10:01:09 -0800 To: steve_mcmains @admin.state.ak.us CC: "GPB, Environ TL" <GPBEnvironTL @BP.com >, "Benson, Gary A" <Gary.Benson @bp.com >, "Pfeiffer, Jim A" <Jim.Pfeiffer @bp.com >, "Kurz, John" <john.kurz@bp.com >, "GPB, GC2 OTL" <gpbec2otl @BP.com >, "GPB, Area Mgr West (GC2 /WRD)" <GPBAreaMgrWestGC2WRD @BP.com >, "GPB, Environ Advisor West" <GPBEnvironAdvisorWest @BP.com> To: Steve McMains, AOGCC steve mcmains @admin.state.ak.us 907 - 793 -1241, fax 907 - 276 -7542 From: Hal Tucker, GPB Prod Optimization Team Leader An uncontrolled release of produced water at GC2 caused a full plant shut down at approximately 0145 on May 21. The release was due to a leak on a flanged T off the water leg of D -slug catcher. This flanged T is connected to a header which is common to all three slug catchers. The volume of the release is unknown at this time. If you require additional information, please don't hesitate to call me. Hal Tucker GPB Prod Optimization Team Leader (907) 659 -4472 i of I 5/21/2007 10:10 AM GPB Gas Flaring incidents Subject: GPB Gas Flaring incidents From: "GPB, Prod Opt TL" <GPBProdOptTL @BP.com> Date: Fri, 25 May 2007 17:45:14 -0800 To: steve_mcmains @admin.state.ak.us CC: "GPB, Environ TL" <GPBEnvironTL @BP.com >, "GPB, Environ Advisor West" <GPBEnvironAdvisorWest @ BP.com>, "Fiedler, Anne M" <Anne.Fiedler @bp.com >, "Benson, Gary A" <Gary.Benson @bp.com >, "Pfeiffer, Jim A" <Jim.Pfeiffer @bp.com >, "Kurz, John" <john.kurz @bp.com >, "GPB, GC2 OTL" <gpbec2otl @BP.com >, "GPB, Area Mgr West (GC2/WRD)" <GPBAreaMgrWestGC2WRD @ BP.com> (907) 659 -4472 To: Steve McMains, AOGCC steve_mcmains@admin.state.ak.us 907 -793 -1241, fax 907 - 276 -7542 From: Dwight Warner, GPB Prod Optimization Team Leader Multiple extended flaring events occurred last week at Greater Prudhoe Bay. An event occurred at GC2 on May 20, when the GC experienced a Master Gas shut down (or stop production) while FCC) (functional check out) crew was working in the skid 18 electrical panel. Flaring occurred from 1331 to 1745 (254 minutes), total volume flared was 1526 MSCF. An additional event occurred at GC2 on May 20, when the LP compressor began recycling due to unstable rates during the start up. Production continued to be brought up to stabilize the gas compressor Flaring occurred from 1745 to 2059 (194 minutes), total volume flared was 539 MSCF. An extended event at GC2 began on May 21, when the GC was shut down due to a leak in the produced water line going from the slug catchers to the skim tanks. Increased sweep gas through skim and surge tanks to keep them from venting to atmosphere. Assist gas was added to keep flares burning clean. Flaring occurred until a new T spool could be installed and surrounding pipe was thoroughly inspected. This event began on May 21 at 0305 and continued until May 25 at 1339 (6394 minutes), total volume flared was 32,305 MSCF. Date Min Volume (MSCF) 5 -21 1255 6101 5 -22 1440 7000 5 -23 1440 7000 5 -24 1440 7000 5 -25 819 5204 If you require additional information, please don't hesitate to call me. Dwight Warner GPB Prod Optimization Team Leader -1 of 1 5/29/2007 6:45 AM I . Facility Number 0280000032 2. Fully Name PBU GC 2 3. Flat 14, Opafalp BP S. Md1WYSY d Disposition June -2007 PBU - WOA Disposition Volume MCF 20. For production from n pooh, list contribution oN sit pod as • prowl of Total Volume. a. Sad 0 Pod Name Pool Code Percent 7. ° PRUDHOE 640150 91.33% AURORA 640120 4.09% 9. Flared cc vented 1 hour or less 7,510 BOREALIS 640130 2.91% ORION 640135 1.34% 9. Flared or versed more than 1 hour (see Inst.) 0 POLARIS 640160 0.33% 10. Perot and Peps 22,857 11. used Iola Sae rOeratlons (spindly In Remarks) 576,517 AWenatlan >t hr. Safety MCF 12. Other (see Instructions) RECEIVED 0 13. TOTAL VOLUME (ITEMS 612) 606,884 stns use MCF q 74. NGL Goa Equivalent JUL 2 a Zoos 0 Conservation MCF d 9•• . t* � 15. Purchased M & Gas Cont Cons. Commission —ter 0 Wears: MCF 16. TrrSened from: 0 Commissioner Oats 17. Trwbnw to: (Express as • negative e) CGF - 24,183,137 18. Remarks Block I l: Fuel Gas = 576,517 nscf and Assist Gas = 0 rnscf I hereby certify that de foregoing Is true to me best of my knowledge. Striatum lame Manager, Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60o F. Authorlry 90 AAf 75.236. Printed Name Bernard . Hajny Prove (907)564 -5028 are 7—. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Form 10 Rev. 1/2004 Submit in Duplicate I Unelanned Events less than or equal to 1 hour a ,mm , +nnL DATE, TIME 6/5/2007 0431 -0446 6/11/2007 0949 - 1007 6/11/2007 1725 -1810 TOTAL TOTAL DATE TIME (Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf Unplanned Events < 1 Hour Unplanned Events > 1 Hoax Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME TOTAL TOTAL BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC - GAS FLARING INCIDENT REPORT June 2007 V OLUME : -,,,,, DESCRIPTION OF INCIDENT & CAUSE., ,,, ACTION TAKEN TO ELMINATECAUSE 260 Not required for unplanned events which Not required for unplanned events which 6,875 are less than or equal to 1 hour are less than or equal to 1 hour 375 7,510 Unplanned Events greater than 1 hour 1 VOLUME DESCRIPTION OF INCIDENT & CAUSE, ., See Attachments 0 (Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf 1 VOLUME DESCRIPTION OF INCIDENT & CAUSEL See Attachments 0 TIME a^w rwm, :,,s VOLUME DESCRIPTION OF INCIDENT & CAUSE ;s ACTION TAKEN TO EUMINATE CAUSE. See Attachments See Attachments 0 + 1 fit. TOTAL' 7,510 0 0 0 Tui 30,367 ACTION TAKEN TO EUMINATE CAUSE See Attachments ACTION TAKEN TO ELIMINATE CAUSE+ v See Attachments Page 1 7/5/2007 10:31 AM Subject: GPB Gas Flaring Incident From: "GPB, Prod Opt TL" <GPBProdOptTL @BP.com> Date: Sat, 16 Jun 2007 16:05:20 -0800 To: steve_mcmains@admin.state.ak.us CC: "GPB, Environ TL" <GPBEnvironTL @BP.com >, "GPB, Environ Advisor East" <GPBEnvironAdvisorEast @BP.com >, "GPB, Environ Advisor West" <GPBEnvironAdvisorWest @BP.com >, "Fiedler, Anne M" <Anne.Fiedler @bp.com >, "Benson, Gary A" <Gary.Benson @bp.com >, "Pfeiffer, Jim A" <Jim.Pfeiffer @bp.com >, "Kurz, John" <john.kurz @bp.com >, "GPB, GC1 OTL" <GPBGCIOTL @bp.com>, "GPB, Area Mgr West (GC2 /WRD)" <GPBAreaMgrWestGC2WRD @BP.com >, "GPB, Area Mgr Central (GC1 /3/FS3)" <GPBAreaMgrCentral@BP.com >, "GPB, Area Mgr East (FS1 /2 /COTU /Seawater)" <GPBAreaMgrEastFS I2CS @BP.com >, "GPB, GC2 OTL" <gpbec2otl @BP.com >, "GPB, FS I OTL" <GPBFS IOTL @bp.com> To: Steve McMains, AOGCC steve_mcmains@admin.state.ak.us 907 - 793 -1241, fax 907 - 276 -7542 From. Hal Tucker, GPB Prod Optimization Team Leader Extended flaring events occurred last week at Greater Prudhoe Bay at FS1, GC1 and GC2. The FS1 event occurred June 12 during plant restart operations. Flaring occurred until sufficient gas was brought into the plant to load up the compressors. Flaring occurred from 20:00 to 22:06 (126 minutes), total volume flared was 3499 MSCF. GC1 flared from 20:19 to 22:30 (131 minutes) on June 11. The flaring occurred when the Annex shut down due to a C -bank level transmitter failure. Total volume flared was 1365 MSCF. On June 1,1 GC2 flared for 18 minutes. However, the flared volume exceeded 5000 MSCF. This event occurred when both LPS turbine /compressors tripped to minimum during a process automation upset. The machines had to be manually reloaded to end the flaring event. Total volume flared was 6875 MSCF. If you require additional information, please don't hesitate to call me. Hal Tucker GPB Prod Optimization Team Leader (907) 659 -4472 1 of 1 6/18/2007 7:14 AM 1 Facility Number 0290000032 2 Facility Name PBU GC 2 3 Field PBU - WOA 4 Operator BP 5. Month/Vey of Disposition July - 2007 Disposition Volume MCF 20. For production from multiple pools, list cant Out on of tact pool as a percent of Total Volume e. Sow 0 Po01 Name Pool Code Percent 7 Renamed 0 PRUDHOE 640150 91.51% AURORA 640120 3.54% 8. Flared or vented) hour or less 1,093 BOREALIS 640130 2.81 °c ORION 640135 1.90% 1 hour (see ins) t 0 POLARIS 640160 0.24% 9 Flared or vented more man 10 Plot and Purge 21.590 11 Used for base operators (specify in Remarks) 605,835 12. Other (see instructions) 0 Official Use only ,.. Autfwnzation >1 hr: Safety MCF 13. TOTAL VOLUME (ITEMS 6-12) 628,518 Lease Use MCF 14. NGL Gas Equivalent 0 Conservation MCF 15. Purchased gas 0 Waste MCF it Transeed from'. 0 Commissioner Date 17. Transferred to (Express as a negative r) CGF - 23,010.197 18, Remarks: Block I l : Fucl Gas = 605.835 msct and Assist Gas = 0 msc( I hereby certify that the signature I mooing is true and correct to the best of my knowledge. Tone Manager, Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 600 F. Authority 20 AAC25.235. dddl Panted Name Bernard W. Hajny Phone (907)564.5028 Dab g, ,/r--07 Form 10 -422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate 1 (Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 7/4/2007 0855 -0903 28 Not required for unplanned events which 7/18/2007 2002 -2024 366 are less than or equal to 1 hour 7/21 /2007 0548 -0559 76 7/30/2007 0654 -0707 623 TOTAL !Unplanned Events greater than 1 hour 1 DATE 1 (Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE DATE 1 (Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE DATE Unplanned Events < 1 Hour Unplanned Events > 1 Hour TIME TOTAL TIME TOTAL TIME TOTAL 1,093 VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments 0 0 0 TOTAL 1.093 0 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events> 1 hour or 0 exceeding 5,000 MCF Pilot Purge 21,590 Assist 0 TOTAL FLARED VOLUME 22,683 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -2 GAS FLARING INCIDENT REPORT July 2007 See Attachments See Attachments See Attachments ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour See Attachments See Attachments Page 1 8/9/2007 2:07 PM 1. Facility Number 0290000032 2 Facility Name PBU GC 2 3 Field PBU - WOA 4. Operator BP 5. Month/Year Of Clapoaitlon August - 2007 Disposition Volume MCF 20. For production from multiple pools, list coot ibution of each p001 as a percent of Total Volume 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 92.69% 3.02% AURORA 640120 8 Flared or vented 1 hour or leas 1,129 BOREALIS 640130 2.79 °0 ORION 640135 1.50% 1 flour (see instil 5,687 .. POLARIS 640160 0.00% 9 Flared or vented more than 10. Plot and Purge 27.170 11. Used fay base operations (specify In Remarks) 593.416 12. Oder (see itstructiore) 0 Official Use Only .:, .._. Authorization 41 tv. �� ty / / (4137 5 MCF 13. TOTAL VOLUME (ITEMS 6-12) 627.402 Lease Use MCF 14 NOL Gas Equivalem 0 ConserVa00% MCF 15 Purchased gas 0 Waste MCF 16. Tratglamed from ��`./ "�' / 1744. s e Dare 17. transferred b: (Egxeaa as a negatively CGF - 23,944,198 18. Remarks Stock I I : Fuel Gas = 593.416 msot and Assist Gas = 0 mscf I hereby certify Mat the foregoing is true and correct to the best or my knowledge. SignatureJ Tide Manager, Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 psla and to a temperature of 600 F. Authority 20 AAC25 235. Printed Narne Bernard W. Hajny Phone (907)564 - 5026 Date 9 Form 10-422 Rev. 1 /2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate 59- 1 (Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 8/3/2007 0614 264 Not required for unplanned events which 8/312007 1618 - 1627 25 are less than or equal to 1 hour 8/6/2007 0842 -0903 292 8/13/2007 0135 -0200 174 8/19/2007 0313 -0324 176 8/25/2007 1127 -1133 62 8/28/2007 1252 -1306 136 TOTAL DATE 8/11/2007 8/27/2007 DATE DATE Unplanned Events < 1 Hour Unplanned Events> 1 Hour TIME 0945 -1615 1324 -1718 TOTAL TIME TOTAL TIME TOTAL 1,129 'Unplanned Events greater than 1 hour 1 VOLUME DESCRIPTION OF INCIDENT & CAUSE 4,062 See Attachments 1,625 5,687 0 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -2 GAS FLARING INCIDENT REPORT August 2007 'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf VOLUME DESCRIPTION OF INCIDENT & CAUSE See Attachments ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE See Attachments 1 ACTION TAKEN TO ELIMINATE CAUSE See Attachments 1 'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf VOLUME DESCRIPTION OF INCIDENT & CAUSE See Attachments 0 TOTAL 1,129 5,687 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 27,170 Assist 0 TOTAL FLARED VOLUME 33,986 ACTION TAKEN TO ELIMINATE CAUSE See Attachments Page 1 9/12/2007 10:51 AM Flare Start Date 8/1/2007 Flare End Date 8/31/2007 Report System 07 -323 Flare Relief 07 -349 Flare Relief GC2 Flare Report Date Start Time Stop Time Duration Black Smoke Intermittent Planned Reported By Volume (mscf) 8/11/2007 9:45:00 AM 4:15:00 PM 390 minutes No No No BPI \CLARKTL 4062 Determination Cause C Bank shut down due to oil leak on nipple on Daniels oil meter. LP compressor shut down due to reduced gas rates. Action Taken Flaring was permitted to continue while GC operations personnel safed out and replaced leaking nipple. 8/27/2007 1:24:00 PM 5:18:00 PM 234 minutes Yes NO Determination Cause Flaring event occurred while bleeding N - 42, N - 44 Flowline to Test Bank. because of a small leak on 'towline. Action Taken Flaring was permitted to continue while operations personnel attempted to evaluate/repair problem. Yes BP1 \MAYRW 1825 McMains, Stephen E (DOA) From: GPB, Prod Opt TL (GPBProdOptTL @BP.comj Sent: Monday, August 13, 2007 1:47 PM To: McMains, Stephen E (DOA) Cc: GPB, Environ TL; GPB, Environ Advisor East; GPB, Environ Advisor West; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Area Mgr East (FS1 /2/COTU /Seawater); GPB, Area Mgr Central (GC1 /3/FS3); GPB, Area Mgr West (GC2/WRD); GPB, FS2 /COTU OTL; GPB, FS3 OTL; GPB, GC2 OTL Subject: GPB Gas Flaring Events To: Steve McMains, AOGCC steve_mcrnains@admin.state.ak.us 907 -793 -1241, fax 907- 276 -7542 From: Hal Tucker, GPB Production Optimization Team Leader Three flaring events have recently occurred at GPB. During maintenance activities at FS3, operations discovered that gas had been slowly leaking into the DS 14B /C common line while it was safed -out. The line was left open to the flare as part of the safe -out to ensure that pressure did not build in the line during maintenance activities. A measurable leak rate was not identified until August 9 when the line was blocked in and showed a pressure increase within a short period of time. The line was shut -in and pressure was allowed to build and then opened to the flare to calculate the apparent leakage rate. Flaring from this line ended when 14B /C was lined up to the slug catcher on August 9. The safe -out has been in place since July 26. Flared volume has been calculated to be 23,716 MSCF, and the duration was approximately 10.5 days. An extended flaring event occurred at GC2 on August 11. Flaring occurred during work to repair a leaking nipple on the C -bank oil meter. The GC2 LP compressor was unable to remain loaded due to decreased GC2 oil production while C -bank was taken out of service for trouble shooting and repair operations. The decision was made to leave GC2 partially on line since the repair was likely to be a quick operation. Duration of the event was 6 hours and 30 minutes, total volume flared was 4,062 MSCF. A flare event exceeding 5,000 MSCF occurred on August 12, 2007 at FS2. This event was due to de- pressuring common -lines during facility restart operations. The lines had to be de- pressured to resolve ESD relay problems. Duration of the event was 43 minutes, total volume flared was 5,208 MSCF. If you require additional information, please don't hesitate to call me. Hal Tucker GPB Production Optimization TL (907) 659 -4472 1 McMains, Stephen E (DOA) From: GPB, Prod Opt TL [GPBProdOptTL @BP.com] Sent: Tuesday, August 28, 2007 9:44 AM To: McMains, Stephen E (DOA) Cc: GPB, Environ TL; GPB, Environ Advisor East; GPB, Environ Advisor West; Fiedler. Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Area Mgr East (FS1 /2 /COTU /Seawater); GPB, Area Mgr West (GC2IWRD); GPB, FS2 /COTU OTL; GPB, GC2 OTL Subject: GPB Gas Flaring Events To: Steve McMains. AOGCC steve_mcmains@admin state.ak.us 907 -793 -1241, fax 907 - 276 -7542 From: Dwight Warner, GPB Production Optimization Team Leader Two flaring events have recently occurred at GPB on August 27th. An extended flaring event occurred on August 27th at FS2 while depressuring the 17 0 common line for smart pigging operations. Flaring began at 10:10 and ended at 13:33 (203 minutes). Total volume flared was 1375 MSCF. An extended flaring event occurred at GC2 on August 27th due to a small leak on the N-44 flowline drain valve. The N-42 and N -44 flowlines were depressured to repair the leak and the lines were put back in service. Flaring began at 13:24 and ended at 17:18 (234 minutes). Total volume flared was 1625 MSCF. If you require additional information, please don't hesitate to call me. Dwight Warner /Alternate Hal Tucker GPB Production Optimization TL (907) 659-5566 1 1 Facility Number 0290000032 2 Facility Name PBU GC 2 3. Field PBU • WOA 4. Operator BP 5. Mon WyeerdDiapgeltiln (September -2007 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pod as a percent of Total Volume 6 SOW 0 Pod Name Pool Code Percent 7 Reined 0 PRUDHOE 640150 93.97% AURORA 640120 3.37% 9. Flared or vented 1 tour or less 4,167 - BOREALIS 640130 1.00% ORION 640135 1.05% 9 Flared or vented more than 1 hour Mee kutr.) (s 27,525 POLARIS 640160 0.61 % 10. Pilot and Purge 10,140 2' 11 Used for Pease operations (specify in Remarks) 131, 982 12. Other (see Instructions) 0 - gfedal Use Orgy Authorization ›1 fu. Safety 7-1, MCF 13. TOTAL VOLUME (ITEMS 8.12) 173 814 Lease Use MCF 14. NGL Gas Equivalent 0 Conservation MU 15. Purchased gas 0 Waste MCF 16 Transferred from: 0 / / PcALI //-/-07 Date 17. Transferred Ur E (.press as a negative al CGF - 5,027,125 / 16. Remarks. Block 1 1 : Fuel Gas = 131,982 mscf and Assist Gas = 0 rluct I hereby comfy that f1e foregoing is true and correct to the best d my knowledge Signature t .'l.L� l AT. fir Tide Manager, Production Taxes and Royalty Note: All volumes must be corrected to Panted Name Bernard W. Hajny Plane (907)564 -5026 Date G -- 1 (0 CU) pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235. a. Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate 'Unplanned Events less than or equal to 1 hour 1 DATE 9/3/2007 TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 1515 -1545 4,167 Not required for unplanned events which are less than or equal to 1 hour TOTAL 4,167 'Unplanned Events greater than 1 hour 1 DATE DATE Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour exceeding 5,000 MCF Pilot Purge ASSISI TOTAL FLARED VOLUME TIME TOTAL TIME TOTAL VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 0 'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf 1 9/8/2007 0300 -0610 9/8/2007 1505 -1945 9/8 912007 2245 - 0800 9/28/2007 1425 -1159 9/29-30/2007 0325 -1315 TOTAL 27,525 TOTAL Unplanned Events < 1 Hour 4,167 Unplanned Events> 1 Hour 0 VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 0 'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf 1 DATE TIME VOLUME DESCRIPTION OF INCIDENT a CAUSE ACTION TAKEN TO ELIMINATE CAUSE 660 See Attachments 1,167 7,510 10,688 7,500 0 27,525 10,140 0 41,832 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -2 GAS FLARING INCIDENT REPORT September 2007 See Attachments See Attachments ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour See Attachments See Attachments See Attachments Page 1 10/8/2007 1:54 PM 7 Flare Start Date 9/1/2007 Flare End Date 9/30/2007 Time Of Flaring Report System Date Start Time Stop Time Duration intermit'nt Bik Smoke Planned Reported By Volume (MSCF) 07 -373 Flare Relief 9/8/2007 3:00:00 AM 6:10:00 AM ,/ 190 minutes No No Yes 13P1\CLARKTL 660 r Determination Cause Depressurng of all LDF,s from well pads to GC for tumaround. Action Taken Flaring was nesessary to depressure LDF to 0 psi for GC turnaround safeout 07-373 Flare Relief 9/8/2007 3:05:00 PM 7:45:00 PM .i 280 minutes No No Yes BP1 \C LARKTL 1 167 Determination Cause Depressurng GLT line Iran GC -1 to GC -2 for safeout. Action Taken Flaring was nesessary to depressure GLT line to 0 psi for GC turnaround safeout. 07 -373 Flare Relief 9/8/2007 10:45:00 PM 12:00:00 AMv 75 minutes No No Ves BP1 \CLARKTL 1404 Determination Cause Depressuring Transit Gas line. Action Taken Flaring was nesessary to depressure Transit Gas line to 0 psi for GC turnaround safeout. 07 -376 Flare Relief 9/9/2007 12:01:00 AM 8'00:00 AM J 479 minutes No No Ves BP1\MESSERTD 6106 '0, Determination Cause Depressed gas transit lines for GC safe outs. Action Taken No response taken as this was planned. 07 -407 Flare Relief 9/28/2007 2:25:00 PM 11:59:00 PM -'574 minutes Yes No Yes BP1 \MAYRW 10688 Determination Cause GC2 Plant depressured in prepration for Skid 19 valve repair /removal. Action Taken Flaring was to maintenance. 07-408 Flare Relief 912912007 3:25:00 AM 11:59:00 PM ' 1234 minutes No No Yes BP1\MAYRW 6800 Determination Cause Transit gas pipeline was depressured for Skid 19 valve repair /replacement This was for maintenance work Action Taken GC2 Flare Report Flare Start Date 9/1/2007 Flare End Date 9'30/2007 Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Bik Smoke Planned Reported By Volume (MSCF) Action Taken GC2 Flare Report 07-409 Flare Relief 9/30/2007 12:01:00 AM 1:15:00 PM 793 minutes No No Yes BP1\MAYRW 700 Determination Cause Transit gas pipeline was depressured tor Skid 19 valve repair /replacement. This Raring was to maintenance. i McMains, Stephen E (DOA) From: GPB, Prod Opt TL [GPBProdOptTL@BP.comj Sent: Wednesday, September 05, 2007 2:11 PM To: McMains, Stephen E (DOA) Cc: GPB, Environ TL; GPB, Environ Advisor East; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Area Mgr North (Gas Plants/GPMA); GPB, Gas Plants OTL; GPB, Environ Advisor West; GPB, Area Mgr East (FS1/2/COTU /Seawater); GPB, Area Mgr Central (GC1l3/FS3); GPB, Area Mgr West (GC2/WRD); GPB, FS1 OTL Subject: GPB Gas Flaring Event To: Steve McMains, AOGCC steve_mcmains@admin.state.ak.us 907- 793 -1241, fax 907- 276 -7542 From: Hal Tucker, GPB Production Optimization Team Leader An extended flaring event occurred across GPB on September 3. Flaring in excess of 5,000 MSCF occurred at CGF, FSI, GC1, GC2 and GC3 when CCP unexpectedly shut down two high stage compressors while "de- mobilizing" obsolete, turbine, control panels. During the de- mobilization process an incorrect wire was lifted, resulting in an ESD of two of the four high stage compressors. GPB shut in 2 MMMSCF /d of production to get out of flare. The following volumes were flared at each plant during the event: CGF 8,400; FS1 12,865; GC1 6,475; GC2 4,167; and GC3 6,771 (all volumes MSCF) . Flare duration was less than one hour at all facilities. If you require additional information, please don't hesitate to call me. Hal Tucker GPB Production Optimization TL (907) 659-4472 1 1 Facility Number 0290000032 12 Facility Name 3 Field PBU • WOA 4 Operator r1 1 l5. Month/Year of Dis ouitioOctober -2007 PBU GC 2 Disposition Volume MCF / 20. For production from mutants pools. list contribution of each pool as a percent of Total Volume 8. Sob 0 Pool Name Pool Code Percent 7 ilekllectee 0 PRUDHOE 640150 93.65% AURORA 640120 3.38% 8 Flared or vented t hour or less 5,100 BOREALIS 640130 1.55% ORLON 640135 0.88% 9 Flared of p e tr vented mote man 1 hour rose) 50.422 POLARIS 640160 0.54% 10 Pilot and Purge 28,918 11. Used for Hasa operations (specify in Remarks) 379,465 12. Other (see instructions) 0 Official Use Oftiy Authorization >1 hr. Safety SO 42Z MCF 13. TOTAL VOLUME (ITEMS 6-12) 463,905 Lease Use MCF 14 NGL Gas Equivalent 0 Conservation MCF 15. Purchased gas 0 Waste MCF 16 Transferred from Q '{ ///r /1 ,�j L�� /� � �+� C 2 _ / -11/ 07 17. Transferred to (Express as a negative el CGF - 17,648,684 18. Remarks. Block I I: Fuel Gas = 379,465 mscf and Assist Gas = 0 mscf I hereby certify that the foregoing Sgnature Panted Name Bernard is true and correct 10 Pre last ef my knowledge. _ �� Title Manager, Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 psis and a temperature of F. Authority hority 20 AAC25.235. 35, W lalny Plan (907)564 -5025 Date ( ( .-- (S '-- 0- Form 10 -422 Rev. 1 /2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate DATE 10/5/2007 10/13/2007 10/14/2007 10/14/2007 10/15/2007 10/15/2007 10/15/2007 10/16/2007 10/1612007 10/17/2007 10/19/2007 10/22/2007 10/22/2007 10/22/2007 10/22/2007 10/23/2007 10/23/2007 10/23/2007 DATE 10/2/2007 10/3/2007 10/3 - 4/2007 10/5/2007 10/6 - 7/2007 10/17/2007 10/19/2007 TIME 2304 -2317 1855 -1911 0537 -0600 2003 -2009 0402 -0411 0850 -0930 1045 -1107 1933 -2005 2158 -2216 0327 -0349 1537 -1550 0711 -0719 1907 -1916 2119-2143 2254 -2350 0452 -0457 1255 -1304 1650 -1656 TOTAL TIME 1433 -2359 0001 -2150 2156 -2027 1100 -1900 2010 -1322 1143 -1805 2144 -2248 TOTAL TOTAL 4,933 50,422 167 BP EXPLORATION (ALASKA/ INC. PRUDHOE BAY UNIT - GC -2 GAS FLARING INCIDENT REPORT October 2007 (Unplanned Events Tess than or equal to 1 hour 1 VOLUME DESCRIPTION OF INCIDENT 6 CAUSE 181 Not required for unplanned events which 556 are less than or equal to 1 hour 319 75 125 694 382 378 162 290 181 100 125 333 777 69 94 92 !Unplanned Events greater than 1 hour 1 VOLUME DESCRIPTION OF INCIDENT & CAUSE 4,717 See Attachments 12,726 16,014 7,778 2,166 6,310 711 ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE See Attachments 1 (Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT 8 CAUSE ACTION TAKEN TO ELIMINATE CAUSE 10/31/2007 0850 167 See Attachments See Attachments Page 1 11/6/2007 9:25 AM 1 'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mct DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments Unplanned Events c 1 Hour Unplanned Events > 1 Hour TOTAL 0 TOTAL 4,933 50,422 Planned Events < 1 hour and not 167 exceeding 5,000 MCF Planned Events 1 hour or 0 exceeding 5 000 MCF Not Purge 28,918 Assist 0 TOTAL FLARED VOLUME 84,440 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -2 GAS FLARING INCIDENT REPORT October 2007 See Attachments Page 2 11/6/2007 9:25 AM Flare Start Date 10/1/2007 Flare End Date 10/31/2007 Action Taken Action Taken GC2 Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF) 07 -415 Flare Relief 10/2/2007 2:33:00 PM 11:59:00 PM 568 minutes No No No BP1\MAYRW 4717 Determination Cause Extended flaring event occurred while GC operations brought production an following GC2 TAR. Assist gas was needed for efeiminating black smoke from LP system. Flaring was permitted to continue while GC operations personnel attempted to restart the equipment. 07 -418 Flare Relief 10/3/2007 12:01:00 AM 950 PM 1309 minutes No No No BP1 \MESSERTD Determination Cause Extended flaring event occurred for GC start up after tumaround, not enough gas to run LP compressor. Action Taken LP compressor started at 2150 hours. 07 -416 Flare Relief 10/3/2007 9:56:00 PM 12:0090 AM 124 minutes Yes No No BP1\MESSERTD Determination Cause LP compressor S surging, not enough gas to keep loaded. Action Taken Continued to bring up rates. 07 - 419 Flare Relief 10/4/2007 12:01:00 AM 8:27:00 PM 1226 minutes Yes No No BP1MESSERTD Determination Cause LP compressor surging due to the lack of gas. Action Taken Plant stem up after turn around. 07 -423 Flare Relief 10/5/2007 11:00:00 AM 7:00:00 PM 480 minutes No No No BP1\MESSERTD Determination Cause Extended flaring event occurred while GC pedormed ESD testing and plant start up. Bringing on production to start compressors. 12726 689 15325 7778 Flare Start Date 10/1/2007 Flare End Date 10/31/2007 Time Of Flaring GC2 Flare Report Report System Date Start Time Stop Time Duration Intermit'nt BIk Smoke Planned Reported By 07 -428 Flare Relief 10/6/2007 8:10:00 PM 12:0000 AM 230 minutes No No No 8P1\VAUGHNMD Determination Cause cool down unit tot maintenance after exhaust problem Action Taken ste spinning for cool down at midnight. 07 -429 Flare Relief 10/7/2007 12:00:00 AM 122:00 AM 82 minutes No No No BP1 \VAUGHNMD Determination Cause LPS compressor K -7001 spin down for maintenance Action Taken finished spin down codling. 07 -450 Flare Relief 10/17/2007 11 43:00 AM 6:05:00 PM 382 minutes No No No BP1 \COWANMM Determination Cause Shut down LP gas system to repair damaged LP discharge check valve on LP compressor K -205 Action Taken 07 -452 Flare Relief 10/19/2007 9:44:00 PM 10:48:00 PM 64 minutes Yes Repairs completed on K -205 compressor and the machine was loaded to stop flaring No No 13P1\MAGIERW Determination Cause K -205 LP compressor lost its bite due to lower production rates. Action Taken Flaring was permitted to Continue while GC operations personnel attempted to correct the problem. Volume (MSCF) 1597 589 6310 711 07 -476 Flare Relief 10/31/2007 8 :50:00 AM 9 :14:00 AM 24 minutes No No Yes BP11MESSERTD 167 Determination Cause LPS compressor K -7001 start up. Action Taken No response taken as this was deemed to be of short duration. McMains, Stephen E (DOA) From: GPB, Prod Opt TL [GPBProdOptTL @BP.com) Sent: Monday, October 01, 2007 9:03 AM To: McMains, Stephen E (DOA) Cc: GPB, Environ TL; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Environ Advisor West; GPB, Area Mgr West (GC2/WRD); GPB, GC2 OTL ' Subject: GPB Gas Flaring Events To: Steve McMains, AOGCC steve_mcmains@admin.state.ak.us 907 -793 -1241, fax 907- 276 -7542 From: Dwight Wamer , GPB Production Optimization Team Leader Multiple flaring incidents have occurred at GC2 while pressuring up the plant after planned maintenance (Turnaround - TAR). An extended flaring event occurred at GC2 on September 28th. Plant needed to be depressured due to a leaking valve in Skid 19 that had to be replaced. The event began at 14:25 and ended at 23:59 (574 minutes). Flaring was intermittent during this time frame. Total volume flared was 10,688 MSCF. An extended flaring event occurred at GC2 on September 29th. The transit gas pipeline was depressured for Skid 19 valve replacement. The event began at 03.25 and ended at 23:59 (1234 minutes). Total volume flared was 23,138 MSCF. The extended event continued on September 30th. The transit gas pipeline continued to be depressured for Skid 29 valve replacement. The event began at 00:01 and ended at 13:15 (794 minutes). The leaking valve replacement began at this time. Total volume flared was 14,888 MSCF. If you require additional information, please don't hesitate to call me. Dwight Warner GPB Production Optimization TL (907) 659-5566 t McMains, Stephen E (DOA) From: GPB, Prod Opt TL [GPBProdOptTL@BP.comj Sent: Saturday, October 06, 2007 2:38 PM To: McMains, Stephen E (DOA) Cc: GPB, Environ TL; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Environ Advisor West; GPB, Area Mgr West (GC2/WRD); GPB, GC2 OTL; GPB, Environ Advisor East; GPB, Area Mgr North (Gas Plants /GPMA); GPB, GPMA OTL; GPB, Area Mgr East (FS112/COTU /Seawater); GPB, FS2/COTU OTL; GPB, Area Mgr Central (GC1I31FS3); GPB, GC1 OTL; GPB, FS1 OTL Subject: GPB Gas Flaring Events To: Steve McMains, AOGCC steve_mcmain s@adm in. state. ak. us 907 - 793 -1241, fax 907- 276 -7542 From: Hal Tucker, GPB Production Optimization Team Leader Multiple extended flaring events occurred at GPB during the last week. Two extended flaring events occurred at FS1 on 10/1 and 10/2 for planned maintenance on their LPS machines. On 10/1 LPS machine 1803 was shut down for water washing. Total duration was 20 hours and 19 minutes, total volume was 4,385 MSCF. The second event occurred on 10/2, for the same activity on 1804. Total duration was 14 hours and 28 minutes, total volume was 1,293 MSCF. FS2 water washed their LPS machine (1803) on 10/4. Total flare duration was 4 hours and 26 minutes, total volume was 924 MSCF. On 10/5, GC1 had two extended flaring events. The first event took place to de- pressure a flowline to make PSV repairs. Total duration was 10 hours and 27 minutes of intermittent flaring which resulted in a total flared volume of 871 MSCF. A second event occurred when ambient temperatures increased. 100 MMSCF /d of production was cut to stop flaring. Total duration of this event was 84 minutes, total volume was 875 MSCF. The LPG facility flared for 97 minutes during the restart process following planned ESD safety system testing on 9/30. Total volume for this event was 97 MSCF. Extended flaring events occurred at GC2 on October 3, 4 and 5 during restart activities following a lengthy, planned, full plant tum- around. Flaring occurred off the LP compressor until sufficient rate was brought on to enable the LP machine to load up and remain loaded (common to all three events). Following the tum- around restart, GC2 was shut down for planned ESD testing, creating an additional extended flaring event. A summary of the flaring events follows: 10/3 Initial restart 21 hrs, 49 min 12,726 MSCF 10/3 -4 Intermittent 22 hrs, 30 min 16,014 MSCF 10/5 Following ESD 8 hrs, 0 min 7,778 MSCF If you require additional information, please don't hesitate to call me. Hal Tucker GPB Production Optimization TL (907) 659-4472 t McMains, Stephen E (DOA) From: GPB, Prod Opt TL [GPBProdOptTL ©BP.com] Sent: Sunday, October 07, 2007 6:55 AM To: McMains, Stephen E (DOA) Cc: GPB, Environ TL; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John: GPB, Environ Advisor West; GPB, Area Mgr West (GC2/WRD); GPB, GC2 OTL Subject: GPB Gas Flaring Event To: Steve McMains, AOGCC steve mcmains@admin.state.ak.us 907 -793 -1241, fax 907 - 276 -7542 From: Hal Tucker, GPB Production Optimization Team Leader An extended flaring event occurred at GC2 beginning at 20:10 on October 6 and ending at 01:22 on October 7, a total duration of 312 minutes. Flaring occurred while spin cooling K7001 turbine in preparation for exhaust system maintenance. Total volume flared was 2,166 MSCF. If you require additional information, please don't hesitate to call me. Hal Tucker GPB Production Optimization TL (907) 659-4472 t Ur 0 lJa Clout% Gv cuw McMains, Stephen E (DOA) rage 1 01 1 From: GPB, Prod Opt TL [GPBProdOptTLQBP.comj Sent: Friday, October 19, 2007 6:22 AM To: McMains, Stephen E (DOA) Cc: GPB, Environ TL; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Environ Advisor East; GPB, Area Mgr East (FS1 /2 /COTU /Seawater); GPB, FS1 OTL; GPB, Environ Advisor West; GPB, Area Mgr West (GC2/WRO); GPB, GC2 OTL Subject: GPB Gas Flaring Events 10/19/2007 To: Steve McMains, AOGCC steve_mcmains @admin.state.ak. us 907- 793 -1241, fax 907- 276 -7542 From: Dwight Warner, GPB Production Optimization Team Leader An extended flaring event occurred at FS1 on October 16 when LPS turbine compressors 1803 and 1804 shutdown due to power blip on the CPS grid. The power blip was caused from dirty insulators due to severe windy conditions without much snow cover. Flaring began at 12:01 and ended at 01:15 (74 minutes). Total volume flared was 1619 MSCF. An extended flaring event occurred at GC2 on October 17 to repair a failed check valve on LPS compressor K -205. The LP gas system was shutdown to repair the damaged LP discharge check valve. Flaring began at 11:43 and ended at 18:05 (382 minutes). Total volume flared was 6310 MSCF. If you require additional information, please don't hesitate to call me. Dwight Warner GPB Production Optimization TL (907) 659-5566 tcn: urn uas r ianng events Page 1 of 1 McMains, Stephen E (DOA) From: GPB, Prod Opt TL [GPBProdOptTLQa BP.com] Sent: Saturday, October 20, 2007 8:32 AM To: McMains, Stephen E (DOA) Cc: GPB, Environ TL; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Environ Advisor East; GPB, Area Mgr East (FS1 /2 /COTU /Seawater); GPB, FS1 OTL; GPB, Environ Advisor West; GPB, Area Mgr West (GC2/WRO); GPB, GC2 OTL; GPB, FS2 /COTU OTL Subject: RE: GPB Gas Flaring Events To: Steve McMains, AOGCC steve_mcmains@admin.state.ak.us 907 - 793 -1241, fax 907 - 276 -7542 From Dwight Warner, GPB Production Optimization Team Leader An extended flaring event occurred at FS1 on October 19 when LPS turbine compressors 1802, 1803 and 1804 shutdown due to power outage on the CPS grid due to dirty insulators. All production was stopped. Power was restored and rates were reestablished. Insulator washing continues as weather allows. Flaring began at 00:28 and ended at 02:13 (105 minutes). Total volume flared was 38300 MSCF. An extended flaring event occurred at FS2 on October 19 when STV -IP compressor shut down due to power outage on the CPS grid due to dirty insulators. Stabilized process and restarted 1801 STV /IP compressor. Flaring began at 00:20 and ended at 04:30 (241 minutes). Total volume flared was 425 MSCF. An extended flaring event occurred at GC2 on October 19 due to lower production rates with LPS compressor K -7001 down for an overhaul. K -205 LP compressor was not able to operater. The flaring event was corrected as flow rates were modified. Flaring began at 21:45 and ended at 22:48 (64 minutes). Total volume flared was 711 MSCF. if you require additional information, please don't hesitate to call me. Dwight Warner GPB Production Optimization TL (907) 659-5566 10/22/2007 1. Facility Number 0290000032 2 Facility Nos PBU GC 2 3 Feld PBU - WOA 4 Operator BP 5 . MoneWearol Disposition November - 2007 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. bold 0 Pool Name Pool Code Percent 7 Reinjected 0 PRUDHOE 640150 92.76% AURORA 640120 2.71% 8 Flared or vented 1 how or less 970 BOREALIS 640130 147% ORION 640135 1.70% 9 Flared or than more an 1 t (se• inch.) 578 POLARIS 640160 0.36% 10. not and Purge 26,635 - 11. Used for lease operations (specify In Remarks) 600 423 12. Omer ( see instructions) 0 �.�. ;_, <v. Yaeo+�el -' S.a.4:. .... �., to "3. A ALA/100%2W >1 hr % Safely 676 MCF 13. TOTAL VOLUME (ITEMS 6-12) 628,606 Lease Use MCF 14 NGL Gas EWvalent 0 Conservatlen MCF 15 Purchased gas 0 Waste MCF 18. Transferred fran: 0 ! / 714 7 f "C - missfoler t Date 17. Transferred to: (Express as a negative e) CGF - 24,096,686 18. Remarks. Block 11: Fuel Gas = 600,423 nucf and Assist Gas = 0 muf I hereby certify trial me foregoing Signature is tr an tract to the best of my knowledge. Tee Manager. Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 pale and to a temperature of 60o F. Authority 20 AAC25.235 Pnnted Name Bemard G t? W. Hajny Phone (907)564 -5028 Date — /p �� Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate 'Unplanned Events less than or equal to 1 hour 1 DATE 11/2/2007 11/7/2007 11/9/2007 11/12/2007 11/12/2007 11/17/2007 11/19/2007 11/25/2007 11/25/2007 TIME 0035 -0044 0222 -0233 2056-2106 1303 -1310 2125 -2136 1222 -1232 1043 -1047 0409 -0415 0425 -0435 TOTAL 1 (Unplanned Events greater than 1 hour TIME 1312 -1416 DATE 11/28/2007 DATE DATE Unplanned Events < 1 Hour Unplanned Events > 1 Hour Planned Events < 1 hour and not exceeding 5000 MCF Planned Events > 1 flour or exceeding 5000 MCF TOTAL TIME TOTAL TIME TOTAL VOLUME DESCRIPTION OF INCIDENT & CAUSE 125 Not required for unplanned events which 138 are less than or equal to 1 hour 69 102 214 139 50 50 83 970 VOLUME DESCRIPTION OF INCIDENT & CAUSE 578 See Attachments 578 1 'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf VOLUME DESCRIPTION OF INCIDENT & CAUSE See Attachments 0 1 'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf VOLUME DESCRIPTION OF INCIDENT & CAUSE See Attachments TOTAL 0 970 578 0 0 Pot Purge ?7="1 28,639 Assist - S4y7.4 tts' O TOTAL FLARED VOLUME 28.183 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -2 GAS FLARING INCIDENT REPORT November 2007 ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE See Attachments ACTION TAKEN TO ELIMINATE CAUSE See Attachments ACTION TAKEN TO ELIMINATE CAUSE See Attachments PIOs1 12'10Y2007 1:41 PM Flare Start Date 11/1/2007 Flare End Date 11/30/2007 Time Of Flaring GC2 Flare Report Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF) 07 -516 Flare Relief 11/28/2007 1 PM 2:16:00 PM 64 minutes No No No BP1\CLARKTL 578 Determination Cause IP K -207 compressor shut down because of a problem associated with vibration. Action Taken Flaring was permitted to continue while GC operations personnel attempted to restart the equipment. Two restarts attempted on K - 207 but were unsuccessful. K -208 was started and on -line. McMains, Stephen E (DOA) From: GPB, Prod Opt TL [GPBProdOptTL@BP.comj Sent: Thursday, November 29, 2007 9:14 AM To: GPB, Prod Opt TL; McMains, Stephen E (DOA) Cc: GPB, Environ TL; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Environ Advisor East; GPB, Area Mgr Central (GC1 /3 /FS3); GPB, FS3 OTL; GPB, Environ Advisor West; GPB, GC2 OTL; GPB, Area Mgr West (GC2/WRD) Subject: GPB Gas Flaring Events To: Steve McMains, AOGCC steve mcmains @admin.state.ak.us 907 -793 -1241, fax 907 - 276 -7542 From: Dwight Warner, GPB Production Optimization Team Leader Extended flaring events; On 11/27/07 an extended flaring event occurred at GC3. The choke on will X -27 needed to be repaired /replaced which required a full plant shut down of the pad. X -pad was shut down, depressured, the choke was repaired and the pad was brought back on line. Flaring began at 0640 and ended at 0745 (65 minutes). The total volume flared was 300 MSCF. On 11/28/07 an extended flaring event occurred at GC2. The I- compressor K -207 shut down due to problems associated with vibration. Flaring continued while GC personnel attempted to restart the equipment. Two restarts were attempted on K -207, but were not successful, K -208 was stated and put on -line. Flaring began at 1312 and ended at 1416 (64 minutes). Total volume flared was 578 MSCF. If you require additional information, please don't hesitate to call me. Dwight Warner GPB Production Optimization TL (907) 659 - 5566/4472 1 1. Facility Number 0290000032 2. Faddy Name PBU GC 2 3 Field PBU - WOA 14. Operator 5. Month/Year d Oiwoeitidnh BP (December -2007 Dlsposltlon Volume MCF 20. Far production from multiple pools. list contribution of each pool as a percent at Total Van. 6. Sold 0 Pod Name Pod Code Percent 7. Reelected 0 PRUDHOE 640150 93.23% AURORA 640120 2.63% e. Flamdor vented 1hourorless 21,512 w BOREALIS 640130 1.79% ORION 640135 1.95% 9. Flared or vented more than 1 hour (see EMIL) 4,544 • -.. POLARIS 640160 0.40% 10. Pilot and Purge 29,196 11. Used for lease operations (specify M Remarks) 653,046 4 5 MCF elfruyi 12. Otter (see instructions) 0 Authorization >1 nr: Safety Se 13. TOTAL VOLUME (ITEMS 6-12) 708,298 Lease the MCF 14. NGL Gas Equivalent 0 Conservation AICF 15. Purchased gas 0 waste MCP 18. Transferred from: 0 y /►W� / (�(� ��j l 4%— Commis3l n6 of -1 Date I�!/ q �L� I 17. Transbrred to: (Express as a negative a) CGF - 25,430,404 la. Remarks: Block 11: ;Ltd( Gas = 653,046 Imcf and Assist Gas = 0 mscf i'`t /f :0 A�..C.1'L L 1 rut' '.3'W -GL. ,fi- -L c Dr,. -•-S/ .. .1,-,--2- t woQl.._ C174,44 ( 'Y I hereby certify that the foregoing is and ect to the best d my knowledge. Signature / Title Manager, Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 psla a Authority a temperature BOO F. 20 AAC25.235. Printed Name Bernard W. Ha(ny Phone (9071564-5028 Date / /� C,-/ —1 Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate DATE 12/7/2007 12/10/2007 12/11/2007 12/11/2007 12/14/2007 12/15/2007 12/15/2007 12/16/2007 12/17/2007 12/17/2007 12/17/2007 12/18/2007 12/18/2007 12/18/2007 12/18/2007 12/19/2007 12/19/2007 12/19/2007 12/19/2007 12/20/2007 12/20/2007 12/21/2007 12/21/2007 12/21/2007 12/22/2007 12/24/2007 12/26/2007 12/26/2007 DATE 12/11/2007 12/22/2007 TIME 0757-0830 0610 -0613 0203 -0215 0939 -0943 2047 -2103 2114 -2137 2252 -2328 2039 -2051 0248 -0322 0416 -0436 2354 -2359 2014 -2051 2129 -2152 2242 -2309 2339 -2359 0000 -0006 0027 -0038 0108 -0117 0436 -0440 2023 -2031 2038 -2048 0120 -0200 1953 -2000 2343 -2352 0311 -0323 1137 -1151 0240 -0307 0446 -0449 TOTAL TIME 1121 -1229 0425-0616 TOTAL 21,512 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-2 GAS FLARING INCIDENT REPORT December 2007 !Unplanned Events less than or equal to 1 hour 1 VOLUME DESCRIPTION OF INCIDENT & CAUSE . .. 10,312 Not required for unplanned events which 44 are less than or equal to 1 hour 183 61 4,167 399 625 208 590 347 87 642 399 469 347 104 191 156 69 139 174 695 122 156 208 97 469 52 ACTION TAKEN TO EUMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour !Unplanned Events greater than 1 hour 1 VOLUME DESCRIPTION OF INCIDENT & CAUSE._„ ,, ACTION TAKEN TO EUMINATE CAUSE See Attachments See Attachments 1,002 4,544 Page 1 1/8/2008 2:07 PM 1 (Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf TIME VOLUME. DESCRIPTION OF INCIDENT & CAUSE ACTON TAKEN TO ELIMINATE CAUSE -, TOTAL DATE Unplanned Events < 1 Hour Unplanned Events > 1 Hour TOTAL 0 0 TOTAL 21,512 4,544 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge SIN 29.198: Assist INS 0{ TOTAL FLARED VOLUME 55,252 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -2 GAS FLARING INCIDENT REPORT December 2007 See Attachments 1 'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE_ See Attachments See Attachments See Attachments Page 2 1/!/2000 2:07 PM Flare Start Date 12/1/2007 Flare End Date 12/31/2007 GC2 Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF) 07 -553 Flare Relief 12/11/2007 11:21:00 AM 12:29:00 PM 68 minutes No No No BP1 \VAUGHNMD Determination Cause High gas transit line pressure caused by all CGF compressors S/D. Action Taken WOA reduced production rates and shut -in wells equaling 1 billion scfd. EOA reduced production rates and shut -in wells equaling 2 billon scfd. Wells were shut - in or choked back starting at 1121 hours. 07 -588 Flare Relief 12/22/2007 4:25:00 AM 6:16:00 AM 111 minutes No No No BP1 \MAYRW 1002 Determination Cause LP compressor lost forward flow due to back pressure from V -236. Action Taken V -236 pressure was lowered by increasing forward flow from K-207 Compressor. 3542 McMains, Stephen E (DOA) From: GPB, Prod Opt TL [GPBProdOptTL @BP.com] Sent: Friday, December 14, 2007 10:35 PM To: McMains, Stephen E (DOA) Cc: GPB, Environ TL; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Environ Advisor East; GPB, Area Mgr Central (GC1/3/FS3); GPB, Environ Advisor West; GPB, Area Mgr East (FS1 /2 /COTU /Seawater); GPB, Area Mgr North (Gas Plants /GPMA); GPB, Area Mgr West (GC2/W RD); GPB, Gas Plants OTL; GPB, FS1 OTL; GPB, FS3 OTL; GPB, GC1 OTL; GPB, GC2 OTL; GPB, GC3 OTL; GPB, FS2 /COTU OTL Subject: GPB Gas Flaring Event To: Steve McMains, AOGCC steve_mcmains@admin.state.ak.us 907 -793 -1241, fax 907- 276 -7542 From: Dwight Warner, GPB Production Optimization Team Leader On December 11 beginning at 11:18 am, an extended flaring event happened at Prudhoe Bay. A power substation serving CGF went down while work was being done on the transmission and distribution system. This caused a shutdown at CGF and flaring at the facilities below. The total volume and duration is reported below. CGF: 17,126 MSCF 7 hr 36 min - The duration is mostly associated with the MI compressors. All of the tandems only flared for 10 -12 min while troubleshooting and reloading FS1: 4,317 MSCF 24 min FS2: 218 MSCF 52 min GC1: 6,562 MSCF 21 min GC2: 3,542 MSCF 68 min GC3: 6,198 MSCF 51 min Total volume: 37,963 MSCF. Flaring began at 11:18 and was intermittent through as late as 18:54 at CGF. Most of the facilities were back on line within an hour. If you require additional information, please don't hesitate to call me. Dwight Warner GPB Production Optimization TL (907) 659-5566/4472 1 McMains, Stephen E (DOA) From: GPB, Prod Opt TL [GPBProdOptTL@BP.comj Sent: Saturday, December 15, 2007 9:13 AM To: McMains, Stephen E (DOA) Cc: GPB, Environ 'It; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Environ Advisor East; GPB, Area Mgr Central (GCI I3IFS3); GPB, Environ Advisor West; GPB, Area Mgr East (FS1 /2 /COTU /Seawater); GPB, Area Mgr North (Gas PlantsIGPMA); GPB, Area Mgr West (GC2/WRD); GPB, Gas Plants OTL; GPB, FS1 OTL; GPB, GC1 OTL; GPB, GC2 OTL; GPB, GC3 OTL Subject: GPB Gas Flaring Event To: Steve McMains, AOGCC steve_mcmains@admin.state.ak.us 907 -793 -1241, fax 907 - 276 -7542 From: Dwight Warner, GPB Production Optimization Team Leader On December 13 beginning at 00:12 am, an extended flaring event happened at Prudhoe Bay. The large dirt/contamination caused flashover that damagaed the CPS yard step -up transformer T -6 and caused the severe voltage sags and surges to go throughout the entire GPB power grid and shutdown numerous pieces of equipment at some of the facilities causing flaring. Shown below are the totals for each facility and the longest duration of any flaring event due to the outage at the respective facility. FS1: 86,656 MSCF 5 hr T/C 1802, 1803 and 1804 flare reports GCI: 19,479 MSCF 85 min GC3: 892 MSCF 4 hr 17 min Total volume flared related to this event: 107,027 MSCF On December 14 beginning at 20:45 am, an extended flaring event happened at Prudhoe Bay. A substation at CCP /CGF surged /shorted which caused CGF to loose all power and the FS1 annex to shut down. This also resulted in flaring at some of the other facilities. CGF: 3,432 MSCF 58 min FS1: 13,750 MSCF 90 min 8125 MSCF 90 min for shut -in of wells and loading 1803, 5625 MSCF 60 min due to annex shutdown OSD GC1: 13,750 MSCF 44 min compressors were not restarted until 23:07 GC2: 4,167 MSCF 16 min GC3: 9,456 MSCF 37 min Total volume flared related to this event: 44,255 MSCF It you require additional information, please don't hesitate to call me. Dwight Warner GPB Production Optimization TL (907) 659-5566/4472 1 McMains, Stephen E (DOA) From: GPB, Prod Opt TL (GPBProdOp1TL @BP.comj Sent: Monday, December 24, 2007 3:53 PM To: McMains, Stephen E (DOA) Cc: GPB, Environ TL; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Environ Advisor West; GPB, GC2 OTL; GPB, Area Mgr West (GC2/WRD) Subject: GPB Gas Flaring Event To: Steve McMains, AOGCC steve_mcmains@admin.state.ak.us 907 -793 -1241, fax 907- 276 -7542 From: Hal Tucker, GPB Production Optimization Team Leader On 12/22/07 an extended flaring event occurred at GC2 when LP compressor, K205, lost forward flow. Troubleshooting efforts identified high back pressure from inlet knockout to IP compressor K207 as the cause. Output from K205 was increased allowing K207 to Toad back up. Flaring lasted for 111 minutes. Total volume flared was 1002 MSCF. If you require additional information, please don't hesitate to call me. Hal Tucker GPB Production Optimization TL (907) 659-5566/4472 1