Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPBU GC 3 / BPSTATE OF ALASKA AOGCC GAS DISPOSITION FILES YEAR: 2007 FACILITY: PBU GC 3 OPERATOR: BP EXPLORATION 1. Facility Number 2 Facility Name 0290000033 I PBU GC 3 3 Field PBU - WOA Ope I4. nto BP I. Month/Year of Disposition January-2007 of each pod as percent of Disposition Volume MCF 20. For production horn multiple pools, list canalisation Total Vduns. & Sold 0 Pad Name Pod Code Percent 7 Reinjected 0 PRUDHOE 640150 100.00% 8. Flaed or ventdl hour et less 2,886 ✓ 9. Flared or vented more than 1 hour (see Instr.) 220 j/ 10. Pilot and Purge 17,621 11. Used for lease operation, (specify in Raman) 528,552 12. Other (see instructions) 0 Auihorizatlon >1 hr. Safety 2-' (N MCF 13. TOTAL VOLUME (ITEMS 612) 549,279 Lease Use MCF 14. NGL Gas Equivalent 0 Conservation MCF 15. Purchased gas 0 Waste: MCF 16. Transferred from: 0 /9 3 - 27 7 issionCorr a � 17. Traneremed s: (Express as a negative e) CGF - 26,902,081 18. Remarks: Block I 11 Fuel Gas = 528,552 mach and Assist Gas = 0 nscf I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature /\All %- � - 'Cr.. Tone Manager, Production Taxes and Roy Ity Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 AAC25.235. J Printed Name Bernard W. Rainy Phone (907)564.5028 Date �/ 0 Fonn 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate 1 Unplanned Events less than or equal to 1 hour DATE ,,-.� TIME A mmar VOLUME DESCRIPTION OF INCIDENT & CAUSE .tea ACTION TAKEN TO EUMINATE CAUSE 1/5/2007 0117 -0141 2,000 Not required for unplanned events c= 1 hr Not required for unplanned events which 1/20/2007 2334 -2359 52 1/26/2007 1400 -1420 834 TOTAL (Unplanned Events greater than 1 hour TIME " mar VOLUME DESCRIPTION OF INCIDENT & CAUSE 0000 -0140 220 See Attachments DATE 1/21/2007 TOTAL 2,886 220 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING INCIDENT REPORT January 2007 ACTION TAKEN TO EUMINATE CAUSE See Attachments 1 `Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf VOLUME__ DESCRIPTION OF INCIDENT & CAUSE ,� ,,,,,, ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TIME TOTAL 1 (Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf VOLUME OF INCIDENT & CAUSE See Attachments DATE TIME TOTAL TOTAL Unplanned Events < 1 Hour 2,888 Unplanned Everts > 1 Hour Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge _: 17 , 62 1 Assist 0 TOTAL FLARED VOLUME 20,727 0 0 220 ACTION TAKEN TO EUMINATE CAUSE„ See Attachments Page 1 2/20/2007 2:32 PM Flare Start Date 1/1/2007 Flare End Date 1/31/2007 Determination Cause 07-39 Flare Relief 1/21 /2007 12:00:00 AM 1•4000 AM 100 minutes No GC3 Flare Report Time Of Flaring Report Date Start Time Stop Time Duration Intermittent Black Smoke Planned Action Taken No No Wet Gas compressor shutdown because of High DP across lube orl fitters. Flaring was permitted to continue while GC operations personnel attempted to restart the equipment. On third re -start attempt machine started. Reported By Volume (MSCF) BP1UALLERGW 220 GPB Gas Flaring Incident 1 of 1 Subject: GPB Gas Flaring Incident From: "GPB, Prod Opt TL" <GPBProdOptTL @BP.com> Date: Sun, 21 Jan 2007 10:03:38 -0900 To: steve_mcmains @admin.state.ak.us CC: "GPB, Environ TL" <GPBEnvironTL@BP.com >, "GPB, Environ Advisor West" <GPBEnvironAdvisorWest @BP.com >, "Fiedler, Anne M" <Anne.Fiedler@bp.com>, "Benson, Gary A" <Gary.Benson @bp.com >, "Pfeiffer, Jim A" Uim.Pfeiffer@bp.com >, "Kurz, John" <johtl.kurz@bp.com>, "GPB, GC3 Area M,gr" GPBGC3TL@BP.com> To: Steve McMains, AOGCC Steve mcmains @admin.state.ak.us 907 - 793 -1241, fax 907 - 276 -7542 From: Michael Bolkovatz, GPB Prod Optimization Team Leader An extended flaring event occurred on January 20 -21, 2007. GC3 wet gas compressor K -5500 shutdown due to high differential pressure across the lube oil filters. Due to the ambient temperature ( -10 deg), and adhering to the K -5500 wet gas compressor standard operating procedure for winter conditions, the decision was made to not shut in high watercut wells after the first hour. The lube oil filters were replaced and the machine was restarted. Flaring occurred from 2334 hrs on 1/20 to 0140 hrs on 1/21 (126 minutes), total volume flared was 272 MSCF. If you require additional information, please don't hesitate to call me. Michael Bolkovatz GPB Prod Optimization Team Leader (907) 659 -5566 1/22/2007 8:23 AM 1. Facility Number 0290000033 2. Facility Name 3 Field PBU - WOA s. Operator BP BP 5 Month Dispositon February-2007 ibution of each pool as a percent of PBU GC 3 Disposition Volume MCF 20. For production from multiple pods, list cont Total Volume. 6. Sold 0 Pool Name Pod Code Percent 7. Reinjected 0 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour cc less 366 9 Flared or versed more than 1 hots (see Josh.) 0 10. Pilot and Purge 16,853 11. Used for base operations (specify in Remarks) 465,837 12. Other (see instructions) 0 ' .... „i, Authorization >1 hr. Safety 13. TOTAL VOLUME(REMS612) 483,056 Lease Use MCF it NGL Gas Equivalent 0 Conservation MCF 15. Purchased gas 0 Waste MCF 18. Transferred from: 0 Convthissbner Dab 17. Transferred to: (Express as a negative e) CGF - 25,765,875 18. Remarks: Block 11: Fuel Gas = 465,837 mscf and Assist Gas = 0 mscf I hereby certify Mat the foregoing is true and corr- - to the best of my knowledge. Sgnature -" ay. Tide Manager, Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 psla and to a temperature of 60o F. Authority 20 AAC25.235. j Printed Name Bernard W. Hajny Phone (907)564 -5020 Date S� % ce t L Form 10 -422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate • 1 'Unplanned Events less than or equal to 1 hour - DATE TIME _....._ VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO EUMINATE CAUSE 2/8/2007 1017 -1023 2/10/2007 1343 -1359 2/22/2007 1337 -1346 2/24/2007 0956 -1018 x DATE _ _ DATE_ _..._ -;_„ DATE, Unplanned Events < 1 Hour Unplanned Events > 1 Hour TOTAL TIME, . TOTAL VOLUME. TOTAL TIME _ TOTAL VOLUME, TOTAL 366 0 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Piot Purge Nadia 18,853 Assist Ma DI TOTAL FLARED VOLUME 17,219 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT • GC-3 GAS FLARING INCIDENT REPORT February 2007 42 Not required for unplanned events <= 1 hr 111 60 153 366 0 0 0 See Attachments See Attachments Not required tor unplanned events which 'Unplanned Events greater than 1 hour —., VOLUME : • DESCRIPTION OF INCIDENT & CAUSE ,, ACTION TAKEN TO ELIMINATE CAUSE-CS , See Attachments 'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DESCRIPTION OF INCIDENT & CAUSE__ _ ACTION TAKEN TO ELIMINATE CAUSE:, stmaA.w _,,,_, See Attachments See Attachments Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DESCRIPTION OF INCIDENT & CAUSE - ACTION TAKEN TO ELIMINATE CAUSE, r ,„.„ See Attachments Page 1 3/5/2007 3:40 PM 1 Facility Number 0290000033 2. Facility Name PBU GC 3 3. Field 4 Operator BP 5. MonNWear of Disposition March - 2007 PBU - WOA Disposition Volume MCF ✓ 20. For production from multiple pools, list contnbution of each pod as a percent of Total Volume 8. Sold 0 Pool Name Pool Code Percent 7 Reinjected 0 PRUDHOE 640150 100.00% 8. Flared or vented 1 four or less 410 9 Flared or vented more than 1 how (see instr.) 873 i0. Not and Purge 14,415 11. Used for tease operations (specify in Remarks) 522,378 12. Omer (see instructions) 0 . „. , yaw* authorization >4 hr Sate Safety ^ 73 `3 MCF 13. TOTAL VOLUME (ITEMS 612) 538,076 Lease Use MCF 14 NGL Gas Equivabm 0 Conservation MCF 15. Purchased gas 0 Waste. MCF 16. Transferred from 0 (:..RI,/e7 {.'�//'��A Cdnmissior , .. - 26 Da9 17. Transferred o: (Express as a negative s) CGF - 28.176,998 18. Remarks Block 11: Fuel Gas = 522 378 mscf and Assist Gas= 0 nisei I hereby certify that the for ring Signature is mm and correct to of my knowledge Title Manager, Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 AAC25.235. �e” j /6 te Printed Name Bemard W. Hajny Phone (907)564-5028 Date Y7 Form 10 -422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate 1 'Unplanned Events less than or equal to 1 hour VOLUME DESCRIPTION OF INCIDENT & CAUSE 125 Not required for unplanned events a 1 hr 63 201 21 DATE 3/20/2007 3/23/2007 3/30/2007 3/30/2007 TIME 1053 -1105 1324 -1331 0554 -0623 0759 -0805 TOTAL (Unplanned Events greater than 1 hour DATE - TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 873 See Attachments 3/28 -29/07 1712 -0129 DATE TOTAL Planned Events Less Then or Equal 1 Hour AND Not Exceeding 5000 Mcf 1 DATE TIME TOTAL TIME TOTAL Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME 410 873 VOLUME- DESCRIPTION OF INCIDENT & CAUSE , ACTION TAKEN TO ELIMINATE CAUSE, See Attachments TOTAL 0 1 'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO EUMINATE CAUSE 0 410 873 0 0 ^'^ 1 ktiosimibisto 0 15,698 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -3 GAS FLARING INCIDENT REPORT March 2007 See Attachments See Attachments ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments Page 1 4/5/2007 9:43 AM Flare Start Date 3/1 /2007 Flare End Date 3/31/2007 GC3 Flare Report Time Of Flaring Report Number Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume (MSCF) 07-107 Flare Relief 3/28/2007 5:12:00 PM 12:00:00 AM 408 minutes Yes No No BP1 \MESSERTD Determination Cause Data Highway communication SA) GC -3. Action Taken All wells were S/1 at 1745 hrs. Hardware Tech's called t0 trouble shoot problem. 07-108 Flare Relief 3/29/2007 12:01:00 AM 1:29:00 AM 88 minutes Yes No No BPI \MESSERTD Determination Cause Data Highway communication problem. Action Taken AM wefts had been SA. Hardware Tech's called out to repair. 587 308 GPB Gas Flaring Incident Subject: GPB Gas Flaring Incident From: "GPB, Prod Opt TL" <GPBProdOptTL @BP.com> Date: Sun, 01 Apr 2007 14:24:38 -0800 To: steve_mcmains @admin.state.ak.us CC: "GPB, Environ TL" <GPBEnvironTL@BP.com >, "Fiedler, Anne M" <Anne.Fiedler @bp.com>, "Benson, Gary A" <Gary.Benson @bp.com >, "Pfeiffer, Jim A" <Jim.Pfeiffer @bp.com >, "Kurz, John" <john.kurz @bp.com >, "GPB, GC3 OTL" <GPBGC3OTL@bp.com >, "GPB, Area Mgr Central (GC1 /3/FS3)" <GPBAreaMgrCentral @BP.com >, "GPB, Environ Advisor West" < GPBEnvironAdvisorWest @BP.com >,y,,. To: Steve McMains, AOGCC steve_mcmains@admin.state.ak.us 907 - 793 -1241, fax 907 - 276 -7542 From: Hal Tucker, GPB Production Optimization Team Leader An extended flaring event occurred last week at Greater Prudhoe Bay. The event occurred at GC3 on March 28. GC3 shut down due to a data highway communication problem. The water section remained on line to inject water coming from GC1 to the GC3 waterflood patterns. The source of the flaring was "sweep gas" used to eliminate H2S build up in the skim tank. Flaring occurred from 1712 hrs on 3/28 to 0129 hrs on 3/29 (496 minutes), total volume flared was 863 MSCF. If you require additional information, please don't hesitate to call me. Hal Tucker GPB Prod Optimization Team Leader (907) 659 -4472 1 of 1 4/2/2007 7:50 AM GPB Gas Flaring Incident Subject: GPB Gas Flaring incident From: "GPB, Prod Opt TL" <GPBProdOptTL @BP.com> Date: Mon, 02 Apr 2007 07:55:52 -0800 To: steve_mcmains@admin.state.ak.us CC: "GPB, Environ TL" <GPBEnvironTL@BP.com >, "Fiedler, Anne M" <Anne.Fiedier @bp.com> "Benson, Gary A" <Gary.Benson @bp.com >, "Pfeiffer, Jim A" <Jirn.Pfeiffer@bp.com >, "Kurz, John <john.kurz @bp.com >, "GPB, Gas Plants OTL" <GPBGasPlantsOTL @ bp.com >, "GPB, Area Mgr North (Gas Plants/GPMA)" <GPB_AreaMgrNorth@BP.com >, "GPB, Environ Advisor East" < GPBEni*ironAdvisorEast@BP.cbtu> To: Steve McMains, AOGCC steve_mcmains@admin.state.ak.us 907- 793 -1241, fax 907 - 276 -7542 From. Hal Tucker, GPB Production Optimization Team Leader An extended flaring event occurred on March 29 at Greater Prudhoe Bay. The event occurred at CGF when T/C 1805 was shut down to repair a cracked weld -o -let on the suction piping. Flaring continued until the CGF process could be stabilized and the 1805 T/C depressurized. Flaring occurred from 1029 hrs until 1158 hrs (89 minutes), total volume flared was 928 MSCF. If you require additional information, please don't hesitate to call me. Hal Tucker GPB Prod Optimization Team Leader (907) 659 -4472 1 of 1 4/2/2007 8:I7 AM 1. Faced} Number 0290000033 2 Facility Name I PBU GC 3 3. Field PBU - WOA 14. Operator IBP 5. Month/Year of Disposition Apri1 Disposition Volume MCF 20. For production from multiple pools. list contribution of each pool as a percent of Total Volume. It Sob 0 Pool Name Pool Code Percent 7 Reelected 0 PRUDHOE 640150 100.00% 8 Flared or vented 1 hour or less 636 9 Flared or vented more than 1 four (see alattl 0 10 Pot and Purge 14,202 11. Used for lease operations (specify in Remoras) 493,874 12. Omer (see instructions) 0 sx •.•..- :.•- _ ^TM " fiG.�zu= " - ► 4s i�Y 0 ��: Authorization >1 hr. Safety MCF 13. TOTAL VOLUME (ITEMS 612) 508,712 Lease Use MCF 14. NGL Gas Equivalent 0 Conservation MCF 15. Purchased gas 0 Waste: MCF 18. Transferred from: 0 Comnassibner Dare 17. Transferred td: (Express as a negative 41 COF - 27,667,007 18. Ramada. Black 11: Fuel Gas = 493,874 mscf and Assist Gas = 0 nisi I thereby certdy roar the taregarg is true and correct knowledge. Signature Tale Manager, Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 pale and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Bernard W. Hajny Phone (947)564 -5028 Date —..C.--/P— 0,] 4 Form 10-422 Rev. 1 /2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate Unplanned Events less than or equal to 1 hour 1 DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 4/7/2007 2035 -2048 271 Not required for unplanned events <= 1 hr Not required for unplanned events which 4/19/2007 0215- 0250 365 Unplanned Events greater than 1 hour 1 DATE DATE DATE TOTAL TIME TOTAL 636 VOLUME DESCRIPTION OF INCIDENT & CAUSE See Attachments 0 !Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf 1 TIME . TOTAL VOLUME DESCRIPTION OF INCIDENT & CAUSE .....- See Attachments !Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf 1 TIME TOTAL VOLUME 0 0 TOTAL Unplanned Events < 1 Hour 636 Unplanned Events> 1 Hour Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge '. 14,202 AssistS':'''`'e•' =5-"" 0 TOTAL FLARED VOLUME 14,838 0 OP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING INCIDENT REPORT April 2007 DESCRIPTION OF INCIDENT & CAUSE See Attachments ACTION TAKEN TO ELIMINATE CAUSE See Attachments ACTION TAKEN TO ELIMINATE CAUSE - ..... See Attachments ACTION TAKEN TO ELIMINATE CAUSE See Attachments Page 1 5/8/2007 10:50 AM 1. Facility Number 0290000033 12 Facility Name f PBU GC 3 3. FieField 4. Operator PBU - WOA }BP 5. hbntlWear of Disposition May - 2007 Disposition Volume MCF 20. For production horn multiple pools, list conmbution of secti pod as a percent of Total Volume 6. Sold 0 Pool Name Pod Code Percent 7. Reinjected 0 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 1,169 9. Flared or vented more than 1 Inv (see Instr.) 0 10. Plot and Purge 14,878 11. Used for lease operations (specify in Remarks) 507,028 12. Other (see lnatructions) 0 *' " n�^�i iVni � . . Authorization >1 hr Safety MCF 13. TOTAL VOLUME (ITEMS 6.12) 523,075 Lease Use MCF 14. NGL Gas Epavalem 0 Conserva5on MCF 15. Purchased gas 0 Waste MCF 16. Transform! from: 0 Commissioner Date 17. Transferred to: (Express as a negative 0) CGF - 27,777,408 18. Remarks: Block I l: Fuel Gas = 507,028 mscf and Assist Gas = 0 mscf 1 hereby certify that the foregoing is true and tarred to the best of my knowledge. R 1 — rudatV� Title Manager, Production Taxes and Ro alty Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 600 F. Authority 20 AAC25.235. Signature / EJ "�M.� C Q Footed Name Bernard W. Hajny Poona (907)564 -5028 Data O ( 1 D Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate • 1 `Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 5/7/2007 1617 -1633 89 Not required for unplanned events <= 1 hr 5/8/2007 2340 -2359 185 5/9/2007 0000 -0008 78 5/11/2007 1454 -1545 708 5/15/2007 0421 -0426 24 5/22/2007 1031 -1112 85 TOTAL 1 !Unplanned Events greater than 1 hour VOLUME DESCRIPTION OF INCIDENT & CAUSE _ ACTION TAKEN TO ELIMINATE CAUSE - .,.. See Attachments DATE DATE DATE Assist TOTAL FLARED VOLUME TIME • TOTAL TIME TOTAL TIME TOTAL VOLUME 1,169 0 0 0 TOTAL Unplanned Events < 1 Hour 1,169 Unplanned Events> 1 Hour 0 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge eflitjal 14,87& 0 ^ 16,047 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -3 GAS FLARING INCIDENT REPORT May 2007 See Attachments ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which 1 !Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO EUMINATE CAUSE See Attachments See Attachments See Attachments 1 'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments Page 1 6/13/2007 9:13 AM ' F 0290000033 I PB Vim. PBU - WOA IBP or I Ju wdDUpouuon Disposition Volume MCF 20. For produc ton horn multiple pods. list contribution of each pod as • percent of Total Volume 8. Sold 0 Pod Name Pod Code Percent 7. ReeyaLyad ° PRUDHOE 640150 100.00% 8. Find or wonted 1 hour or Iwo 0 e. Flared 1 (see Mt) 0 or vented more than hour 10. PIM and Purge 14,611 11. Used for tease openBOm (spedly In Remamu) 472,111 AuBnrization>t hr: Safety MCF 13. TOTAL VOLUME (ITEMS 1 486,722 Lease Use MCF 14. NOL Gas Equivalent JUL 2 3 2007 0 Conservation MCF 15. Placl ased gag [L f. MS* Or A a +r./111M ConieY e aa_ 0 Waste: MCF 18. Transferred from: Anthony* 0 Connesslaler hate 17. Transferred so: (Express as • negative ) COF -23,955,588 18. Rsrnar s: Block 11: Fuel Gas = 472,111 nlscf and Assist Gas = 0 mscf I hereby codify i at Vie le w and tarred 10 eta toy or my knowledge. Signature nti Manager, Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 p&a and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Bernard . Halny Phone (907)584.5028 Date 7 2O 0? • Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit In Duplicate ' Unplanned Events less than or equal to 1 hour Rr DATE, ., TIME„;knwivvl+r r VOLUME,,;, DESCRIPTION OF INCIDENT & CAUSE - ,u;, ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events <= 1 hr Not required for unplanned events which TOTAL 0 'Unplanned Events greater than 1 hour Iwa DATE TIME VOLUME„,,, DESCRIPTION OF INCIDENT & CAUSE See Attachments TOTAL 0 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING INCIDENT REPORT June 2007 'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE «r_wunw,,,„.0 TIME,,,,,, ,, VOLUME DESCRIPTION OF INCIDENT & CAUSE See Attachments TOTAL 0 TOTAL 0 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 74011 Assist N a ,, TOTAL FLARED VOLUME 14.811 ACTION TAKEN TO ELIMINATE CAUSE , See Attachments ACTION TAKEN TO ELIMINATE CAUSE See Attachments 1 'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME 4, aa„ VOLUME.. DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO EUMINATE CAUSE ,.„;,u, See Attachments See Attachments Pape 1 7/5/2007 10:29 AM 1 Facility Number 0290000033 2 Facility Name PBU GC 3 3 Field PBU - WOA 4. Operator BP S. MonuWyeer 0101180:611011 July - 2007 Disposition Volume MCF 20. For production from multiple pools, list cone button 01 each p001 as a percent of Total Volume 6 Sold 0 Pool Name Pool Code Percent 7 Reinjected 0 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 174 9. Flared or vented more man 1 lour (see nstr.) 0 10. Peot and Purge 16,314 11 Used fa lease operation (specify in Remarks) 489,543 12 Other, (see instructions) 0 i - O61CiY1 Use Only ... _ Authorization >1 hr Safe fy MCF 13. TOTAL VOLUME (ITEMS 6 -12) 506,031 Lease Use MCF 14 NGL Gas Equivalent 0 Conservation MCF 15. Purdresed gas 0 Waste: MCF 16. Transferred from: 0 Commissioner Date 17. Transferred to' (Express as a negative e) CGF - 25.193,997 18. Remarks Bieck I I: Fuel Gas = 489,543 onset and Assist Gas = 0 mx:f 1 hereby certify that the for Ding is true and � best of my knowledge. Signature �� " Tale Ma nager, Production Taxes and Royalty Note: All volumes must be cor rected to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 AAC25.235. U Printed Name Bernard W. Hajny Phone (907)564-5028 Date c;:17 -417—a? Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate 1 $Unplanned Events less than or equal to 1 hour VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 174 Not required for unplanned events <= 1 hr Not required for unplanned events which TIME 7/8/2007 0630 -0635 TOTAL DATE 174 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -3 GAS FLARING INCIDENT REPORT July 2007 !Unplanned Events greater than 1 hour DATE TIME TOTAL VOLUME DESCRIPTION OF INCIDENT & CAUSE See Attachments 0 ACTION TAKEN TO ELIMINATE CAUSE See Attachments (Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf 1 DATE DATE Unplanned Events < 1 Hour Unplanned Events > 1 Hour TIME TOTAL TIME TOTAL VOLUME DESCRIPTION OF INCIDENT & CAUSE See Attachments 0 (Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf 1 Planned Events c 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 16,314 Assist 0 TOTAL FLARED VOLUME 16,488 VOLUME DESCRIPTION OF INCIDENT & CAUSE See Attachments 0 TOTAL 174 0 ACTION TAKEN TO ELIMINATE CAUSE See Attachments ACTION TAKEN TO ELIMINATE CAUSE See Attachments Page t 8/9/2007 2:07 PM 1. Facisly Number 0290000033 2 Facility Name PBU GC 3 3 Field PBU - WOA 4. Operator BP 5 MonttVVear of Disposition August -2007 Disposition Volume MCF 20. For production from multiple pools fist cony ibution of each pool 35 a percent of Total Volume 9. Sold 0 Pool Name Pool Code Percent 7 Reinjected 0 PRUDHOE 640150 100.00% 8 Flared or vented 1 hour or less 0 9. Flared a vented more than 1 tour (see matt.) 0 10. Piot and Purge 16,734 11. Used for lease operations (specify in Remarks) 474.520 12. Other (see instnrctama) 0 Official Use Only ,, _ Authorization >1 hr. Safety �� MCF 13. TOTAL VOLUME (ITEMS 6-12) 491,254 Lease Use MCF 14. NGL Gas Equivalent 0 Conservation MCF 15 Purchased gall 0 Waste MCF 18. Transferred tram: 0 Commissioner Date 17. Transterred to: (Express as a negative 1) Car -25.356481 18. Remarks: Block 11: Fuel Gas = 174520 tmcr and Assist Gas = 0 nncl I hereby certdy that the f egoing is true con the best of my krom eage. Signature _ �j Tine Manager. Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235. l y 1 Printed Name e mard W. Hajny Prone (907)564.5028 Date 77'l Form 10 -422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate • BP EXPLORATION (ALASKA) INC. PRUDHOE BAV UNIT - GC - GAS FLARING INCIDENT REPORT August 2007 1 (Unplanned Events less than or equal to 1 hour VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events <= 1 hr Not required for unplanned events which DATE TIME TOTAL 0 1 'Unplanned Events greater than 1 hour VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE DATE TIME TOTAL 0 See Attachments See Attachments 1 (Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE DATE TIME TOTAL 0 1 'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE DATE Unplanned Events c 1 Hour Unplanned Events> 1 Hour TIME TOTAL 0 TOTAL 0 0 Planned Events c 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 16,734 Assist 0 TOTAL FLARED VOLUME 16,734 See Attachments See Attachments See Attachments See Attachments Page 1 9/12/2007 10:51 AM 1 Facility Number 0290000033 2 Facility Name PBU GC 3 3 field PBU • WOA 4. Operator BP 5 MondVyeefo$ Oi,pds1d011 September -2007 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pod as a percent of Total Volume 8_ Sold 0 Pool Name Pool Code Pen.ant 7 ResNeoted 0 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 7,124 9- Flared or vented more than 1 how (see instr.) 0 10. Pilot and Purge 12,639 11. Used tor lease operations (specify in Remarks) 385.483 12. Omer (sea instructions) Official Use Only Authorization >1 tv. Safety MCF 13. TOTAL VOLUME (ITEMS 8-12) 405,246 Leese Use MCF 14. NGL Gas Egwvatent 0 Conservation MCF 15. Purchased gas 0 Waste; MCF 18. Transferee tram' 0 Commissioner pate 17. Transferred to. (Express as a negative a) COP - 25,095,556 19. Remarks: Block 11: Fuel Gas = 385,483 utCt and Assist Gas = 0 msct I hereby certify that the loregaig is Via and Correct to the best of my knowledge Signature ° Tide Manager, Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 AAC25.235 Panted Name Bernard . Hajny Phone (907)564-5028 Date (0 --1 / 6 — O') Form 10 -422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate 1 (Unplanned Events less than or equal to 1 hour TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 2143 -2149 212 Not required for unplanned events <= 1 hr 1513 -1552 6,771 1424 -1435 107 1310 - 1400 34 B -22 MI leak TOTAL 7,124 DATE 9/1/2007 9/3/2007 9/9/2007 9/18/2007 (Unplanned Events greater than 1 hour 1 DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE DATE TOTAL TOTAL TOTAL TOTAL 0 'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See Attachments 0 (Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf 1 DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments 0 Unplanned Events < 1 Hour Unplanned Events > 1 Hour 0 Planned Events c 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 12,639 Assist 0 TOTAL FLARED VOLUME 19.763 7,124 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -3 GAS FLARING INCIDENT REPORT September 2007 See Attachments ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which See Attachments ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments Page 1 10/8/2007 2:06 PM McMains, Stephen E (DOA) From: GPB, Prod Opt TL (GPBProdOptTL @BP.com] Sent: Wednesday, September 05, 2007 2:11 PM To: McMains, Stephen E (DOA) Cc: GPB, Environ TL; GPB, Environ Advisor East; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Area Mgr North (Gas Plants /GPMA); GPB, Gas Plants OTL; GPB, Environ Advisor West; GPB, Area Mgr East (FS1 /2 /COTU /Seawater); GPB, Area Mgr Central (GC1l3 /FS3); GPB, Area Mgr West (GC2M/RD); GPB, FS1 OTL Subject: GPB Gas Flaring Event To: Steve McMains, AOGCC steve_mcmains@adm in.state.ak.us 907 - 793 -1241, fax 907- 276 -7542 From: Hal Tucker, GPB Production Optimization Team Leader An extended flaring event occurred across GPB on September 3. Flaring in excess of 5,000 MSCF occurred at CGF, FS1, GC1, GC2 and GC3 when CCP unexpectedly shut down two high stage compressors while "de- mobilizing" obsolete, turbine, control panels. During the de- mobilization process an incorrect wire was lifted, resulting in an ESD of two of the four high stage compressors. GPB shut in 2 MMMSCF /d of production to get out of flare. The following volumes were flared at each plant during the event: CGF 8,400; FS1 12,865; GC1 6,475; GC2 4,167; and GC3 6,771 (all volumes MSCF) . Flare duration was less than one hour at all facilities. If you require additional information, please don't hesitate to call me. Hal Tucker GPB Production Optimization TL (907) 659-4472 1 1 Facility Numbs, 0290000033 2 Facility Name PBU GC 3 3 Field PBU - WOA 4. Operator I BP 5 MonUWear of 049084/44 October -2007 Disposition Volume MCF 20. For production from mulilpfe pools. list cunt ibusdn of each pool as a percent of Total Volume e Sod 0 Pool Name Pool Code Percent 7 ed 0 PRUDHOE 640150 100.00% 8 Flared or vented 1 hour or less 1,673 '"' 9 Flared or vented more than 1 how (see instil 4,400 I- 10 Pad and Purge 14,943 11 Used for lease operations (specify m Remarks) 434.478 12 Otter (see mstwctbns) 0 Official Use Only ,. . Authorization .1 nr Safety 4,400 MCF 13. TOTAL VOLUME (ITEMS 8.12) 455.494 lease Use MCF 14 NGI. Gas Equivalent 0 Conservation MCF 15. Purchased gee 0 Waste: MCF MCF 16. Transferred hen: 0 `�G "�✓/ /2 /1- p' " ' COnissl Dale e) 17. Transferred to: (Ecress as a negative CGF - 25,136,692 i e. Remarks. Block 11 Fuel Gas a 434.478 mscf and Assist Gas = 0 mscf I Hereby Certify that the toreyum9 is tare and coned 10 the best of my knowledge „L /1 Sgna(we (/ J r�7 T me Manager, Production Taxes a R oyalty Note: All volumes must be c orrected to pressure of 14.65 psla and to a temperature of 60o F. Authority 20 AAC25.235- /���,lkr�� ) Printed Name Bernard W. Hajny Phone (907)564.5028 Dare I — 1 [^0) Form 10 -422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 1 T REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate (Unplanned Events less than or equal to 1 hour 1 DATE 10/23/2007 10/24/2007 10/24/2007 10/30/2007 DATE 10/29/2007 DATE DATE TIME 1510 -1519 0852 -0938 1634 -1650 1320 -1350 TOTAL 0238 -0830 TOTAL TIME TOTAL TIME TOTAL Unplanned Events c 1 Hour Unplanned Events > 1 Hour Planned Events c 1 hour and not exceeding 5.000 MCF Planned Events > 1 hour or exceeding 5.000 MCF Pilot Purge Assist TOTAL FLARED VOLUME BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -3 GAS FLARING INCIDENT REPORT October 2007 VOLUME DESCRIPTION OF INCIDENT & CAUSE 781 Not required for unplanned events <= 1 hr 750 90 52 1,673 'Unplanned Events greater than 1 hour 1 TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 4,400 See Attachments 4,400 (Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf 1 VOLUME DESCRIPTION OF INCIDENT & CAUSE See Attachments 0 1 (Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf VOLUME DESCRIPTION OF INCIDENT & CAUSE See Attachments 0 TOTAL 1,673 4,400 0 0 14,943 0 21,016 ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which ACTION TAKEN TO ELIMINATE CAUSE See Attachments ACTION TAKEN TO ELIMINATE CAUSE See Attachments ACTION TAKEN TO ELIMINATE CAUSE See Attachments Page 1 11/6/2007 925 AM Flare Start Date 10/1/2007 Flare End Date 10/31/2007 GC3 Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF) 07 - 471 Flare Relief 10/29/2007 2:38:00 AM 8:301)0 AM 352 minutes No No No BPIVACKSOWM Determination Cause Depressured B for maintenance. Used assist gas to prevent black smoke. Action Taken Depressured flowlines and shut in. 4400 urn uas r►anng tvent McMains, Stephen E (DOA) From: GPB, Prod Opt TL [GPBProdOptTLQBP.comj Sent: Monday, October 29, 2007 2:20 PM To: McMains, Stephen E (DOA) Cc: GPB, Environ TL; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Environ Advisor West; GPB, Area Mgr Central (GC1 /3 /FS3); GPB, GC3 OTL Subject: GPB Gas Flaring Event To: Steve McMains, AOGCC steve_mcmains@admin.state.ak.us 907- 793 -1241, fax 907 - 276 -7542 From: Dwight Wamer, GPB Production Optimization Team Leader If you require additional information, please don't hesitate to call me. Dwight Warner GPB Production Optimization TL (907) 659-5566 10/29/2007 Page 1 of 1 An extended flaring event occurred at GC3 on October 29th in order to depressure B -Pad for maintenance. Assist gas was used to prevent black smoke. The system was depressured and flowlines were shut -in Flaring began at 02:38 and ended at 08:30 (352 minutes). Total volume flared was 4400 MSCF. 1 Fanny Number 0290000033 2 FaCilny Name PBU GC 3 3 Feld 4 Operaror BP 5 Month/Year d Disposeswn November -2007 PBU - WOA Dispouaon Volume MCF 20. For production from multiple pools, list conmbudon of each pool as a percent Of Total Volume 8. Sold 0 Foot Name Pool Code Percent 7 Reelected 0 PRUDHOE 640150 100.00% 8. Flared or vented 1 tour cc less 1,012 9. Flared or vented more than 1 four (see Inst.) 300 10. Pilot and Purge 13,174 y 11. Used for lease operations (specify In Remarks) 462,514 12. OdMr(see instructions) 0 Authorization >1 hr. Sate N J MCF 13. TOTAL VOLUME (ITEMS 6-12) 477,000 Lease Ilse MCF 14 NGL Gas Equivalent 0 Conservation MCF 1S. Purchased gas 0 Waste. MMCF horn 16. Transferred to 0 // // /� / Y� ^. Commissioner / 9-6-8 Date 17. Transferred o: (Express as a negative I) CGF - 26,355,521 la Remarks: Block 11: Fuel Gas = 462,514 msct and Assist Gas= O atsct I hereby certify that the foregoing n true nd or ad to the best of my knowledge. Signature Toe Manager, Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 psis an d to a temperature of 60o F. Authority 20 AAC25.235 JJJ p e9 7 /..)-/I Printed Name Bemard W. Hajny Prone (907)564 -5028 Date �-�/ Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate ,�F DATE 1 1 /9/2007 11/11/2007 11/13/2007 11/27/2007 11/30/2007 DATE DATE 11/12/2007 DATE 11/27/2007 TIME 1800 -1804 2029 -2034 0844 -0914 1500-1517 1437 -1444 TOTAL TIME TOTAL 1422 -1515 TOTAL TIME 0640-0745 TOTAL 0 TOTAL Unplanned Events < 1 Hour 644 Unplanned Events> 1 Hour 0 Planned Events < 1 hour and not 368 exceeding 5,000 MCF Planned Events > 1 hour or 300 exceeding 5,000 MCF Pilot Purge 13,174 Assist Weit4430. 0 TOTAL FLARED VOLUME 14,486 368 See Attachments 368 300 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -3 GAS FLARING INCIDENT REPORT November 2007 Un tanned Events less than or e ual to 1 hour VOLUME DESCRIPTION OF INCIDENT & CAUSE 56 Not required for unplanned events c= 1 hr 34 417 59 78 644 (Unplanned Events greater than 1 hour 1 VOLUME DESCRIPTION OF INCIDENT & CAUSE See Attachments (Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf 1 TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE !Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf 1 VOLUME DESCRIPTION OF INCIDENT & CAUSE 300 See Attachments ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which ACTION TAKEN TO ELIMINATE CAUSE., See Attachments ACTION TAKEN TO ELIMINATE CAUSE See Attachments ,., ACTION TAKEN TO ELIMINATE CAUSE, See Attachments Page 1 1211W2007 1:41 PM Flare Start Date 11/1/2007 Flare End Date 11/30(2007 Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF) Determination Cause LPS compressor K -7000 water wash turbine. Copus spun to flare for this job. GC3 Flare Report 07 -495 Flare Relief 11/12/2007 2:22:00 PM 3:15:00 PM 53 minutes No No Yes 8P1\HAYNESBS Action Taken No response taken as this was planned. 07 -515 Flare Relief 11/27/2007 6:40:00 AM 7:45:00 AM 65 minutes No No Yes BPIIFONTENE Determination Cause Depessred X -Pad via C-S/C in preparation tor X - 27 choke repair. Action Taken Completed depressuring X -Pad. 368 300 McMains, Stephen E (DOA) From: GPB, Prod Opt TL [GPBProdOptTL @BP.com1 Sent: Thursday, November 29, 2107 9:14 AM To: GPB, Prod Opt TL; McMains, Stephen E (DOA) Cc: GPB, Environ TL; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Environ Advisor East; GPB, Area Mgr Central (GC1 /3 /FS3); GPB, FS3 OTL; GPB, Environ Advisor West; GPB, GC2 OTL; GPB, Area Mgr West (GC2/W RD) Subject: GPB Gas Flaring Events To: Steve McMains, AOGCC steve_mcmains@admin.state.ak.us 907 -793 -1241, fax 907- 276 -7542 From: Dwight Warner, GPB Production Optimization Team Leader Extended flaring events; On 11/27/07 an extended flaring event occurred at GC3. The choke on will X -27 needed to be repaired /replaced which required a full plant shut down of the pad. X -pad was shut down, depressured, the choke was repaired and the pad was brought back on line. Flaring began at 0640 and ended at 0745 (65 minutes). The total volume flared was 300 MSCF. On 11/28/07 an extended flaring event occurred at GC2. The I- compressor K -207 shut down due to problems associated with vibration. Flaring continued while GC personnel attempted to restart the equipment. Two restarts were attempted on K -207, but were not successful, K -208 was stated and put on -line. Flaring began at 1312 and ended at 1416 (64 minutes). Total volume flared was 578 MSCF. If you require additional information, please don't hesitate to call me. Dwight Warner GPB Production Optimization TL (907) 659 - 5566/4472 1 1. Facility Number 0290000033 2 Facility Name PBU GC 3 3. Field 4. Operator BP 5 MoneWear of Disposition December -2007 PBU - WOA Disposition Volume MCF 20. For production Irern multiple pods. list contribution d Path p001 as a percent of Total Volume 6. Sold 0 Pool Name Pod Code Percent 7 Reinjected 0 PRUDHOE 640150 100.00% 8. Flared or vented I tour or less 24,531 L- 9 Flared or vented mere than 1 tour (see Isb.) 892 e/ 10. Pilot and Purge 13,208 11. Used for base operations (specify in Remarks) 493,260 : - 'ffffir::. Authorization >1 M: . ,. safety y: k 9 Z McF 12. Other (see instructions) 0 13. TOTAL VOLUME (ITEMS 6.12) 531,891 Lease Use MCF 14. NGL Gas Equivalent 0 Conservation MCF 15. Purchased gas 0 Waste MCF 18. Transferred from: 0 ms / /'/ //� /���orhltS'145fdf�6r' Date 7/ G^-/ s'r'i� ;(��/•, ,/ /' 17. transferred 10: (Express as a negative e) CGF - 27,235,429 18. Remarks. Block 11: Fuel Gas = 493,260 and Assist Gas = 0 mscf Q� Qb r G / kdo-eatt: - . 4- .�.b�"^, —C j 11-;-14- • 7T 1.�.t ' lo....:.. -4Ac Lk.�...I f t9'"rt v 4a.t�.^' L t L 7LC (7 1 hereby certify that the t.:.. • Is true a • correct to the best of my kncwfedga. Signal _✓ /an" Title Manager, Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 psla and to a temperature of 60o F. Authority 20 AAC25.215. Printed Name Bernard W. Hajny Phone (907)564 -5028 Date / `el Form 10 -422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate DATE 12/5/2007 12/7/2007 12/7/2007 12/11/2007 12/14/2007 1 12/27/2007 DATE 12/13/2007 DATE DATE Unplanned Events < 1 Hour Unplanned Events > 1 Hour exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME TIME 1939 -1950 0755 -0827 1026 -1035 1121 -1212 2046 -2123 1048 -1055 1126 -1141 TOTAL TIME Y ..- -, 1213 -1630 TOTAL TIME TOTAL TIME_ TOTAL 24,531 892 See Attachments 892 0 0 TOTAL 24,531 892 Planned Events c 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 ISM 1uod a -- — 38,631 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -3 GAS FLARING INCIDENT REPORT December 2007 1 [Unplanned Events less than or equal to 1 hour VOLUME DESCRIPTION OF INCIDENT & CAUSE 229 Not required for unplanned events <= 1 hr 8,250 350 6,198 9,456 34 14 (Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf VOLUME DESCRIPTION OF INCIDENT & CAUSE See Attachments ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which 1 !Unplanned Events greater than 1 hour VOLUME DESCRIPTION OF INCIDENT & CAUSE. - ACTION TAKEN TO ELIMINATE CAUSE,,,, aarn See Attachments ACTION TAKEN TO ELIMINATE CAUSE See Attachments 1 !Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf VOLUME , DESCRIPTION OF INCIDENT & CAUSE -.. _ ACTION TAKEN TO ELIMINATE CAUSE„.. See Attachments See Attachments Page 1 1/8+2008 2:11 PM Flare Start Date 12/1/2007 Flare End Date 12/31/2007 GC3 Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Bik Smoke Planned Reported By Volume (MSCF) 07.561 Flare Relief 12/13/2007 12'13:00 AM 4:30:00 AM 257 minutes No No No BP1 \HAYNESBS Determination Cause Wet Gas compressor shutdown because of power failure associated with field wide CPS power problem. Action Taken Equipment was restarted at 0430 hours. 892 • McMains, Stephen E (DOA) From: GPB, Prod Opt TL [GPBProdOptTL @BP.comj Sent: Saturday, December 15, 2007 9:13 AM To: McMains, Stephen E (DOA) Cc: GPB, Environ TL; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Environ Advisor East; GPB, Area Mgr Central (GC1 /3 /FS3); GPB, Environ Advisor West; GPB, Area Mgr East (FS1 /2 /COTU /Seawater); GPB, Area Mgr North (Gas Plants /GPMA); GPB, Area Mgr West (GC2/WRD); GPB, Gas Plants OTL; GPB, FS1 OTL; GPB, GC1 OTL; GPB, GC2 OTL; GPB, GC3 OTL Subject: GPB Gas Flaring Event To: Steve McMains, AOGCC steveincmains@admin.state.ak.us 907 - 793 -1241, fax 907 - 276 -7542 From: Dwight Warner, GPB Production Optimization Team Leader On December 13 beginning at 00:12 am, an extended flaring event happened at Prudhoe Bay. The large dirt/contamination caused flashover that damagaed the CPS yard step -up transformer T -6 and caused the severe voltage sags and surges to go throughout the entire GPB power grid and shutdown numerous pieces of equipment at some of the facilities causing flaring. Shown below are the totals for each facility and the longest duration of any flaring event due to the outage at the respective facility. FS1: 86,656 MSCF 5 hr T/C 1802, 1803 and 1804 flare reports GC1: 19,479 MSCF 85 min GC3: 892 MSCF 4 hr 17 min Total volume flared related to this event: 107,027 MSCF On December 14 beginning at 20:45 am, an extended flaring event happened at Prudhoe Bay. A substation at CCP /CGF surged /shorted which caused CGF to loose all power and the FS1 annex to shut down. This also resulted in flaring at some of the other facilities. CGF: 3,432 MSCF 58 min FS1: 13,750 MSCF 90 min 8125 MSCF 90 min for shut -in of wells and loading 1803, 5625 MSCF 60 min due to annex shutdown OSD GC1: 13,750 MSCF 44 min compressors were not restarted until 23:07 GC2: 4,167 MSCF 16 min GC3: 9,456 MSCF 37 min Total volume flared related to this event: 44,255 MSCF If you require additional information, please don't hesitate to call me. Dwight Warner GPB Production Optimization TL (907) 659-5566/4472 1