Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutPBU Lisburne Prod (GrPtMcArea) / BPSTATE OF ALASKA
AOGCC
GAS DISPOSITION FILES
YEAR: 2007
FACILITY: PBU Lisburne Prod
(GrPtMcArea)
OPERATOR: BP EXPLORATION
Facility Number
0290000009
12.
2. Facility Facility Name
PBU LISBURNE PROD (GPMA)
3 Fukf
1 Operator
IBP
5. Month/Year d Disposition
January-2007
PBU - GPMA
Disposition
Volume MCF
20. For productlon from multiple pods, Yet cdntntutlon of each pod as a percent of
Total Volume
6. Soil
108,936
Pod Nero'
Pool Code
Percent
7. Rekyectea
7,758,620
Lisburne
640144
42.3%
Niakuk 8 West Niakuk
640148
1.2%
e. Flared a vented t hour or leas
0
North Prudhoe Bay State
640152
0.0%
Pt. McIntyre
640180
54.9%
1 haw (see Yutr.)
0
Raven - Ivishak•Sag River
640147
1.8
9. Flared or vented more nun
West Beach
640188
0.0%
18 Piot and Purge
13 229
11. Used for lease operations (specify k1 Remarks)
942,758
11 Other (see lltaVlwnfOrta)
1,924,212
Authorization >1 hr.
Safely
13. TOTAL VOLUME (ITEMS 612)
10,747,755
Lease Use
MCF
14. NGL Gas Eguivabm
108,936
Conservation
MCF
16. Purchased gas
0
Waste
MCF
16. Transferred from:
2,333,541
Commissioner Date
17. Transferred b: (Egress es • negative a) CGF
0
16. Remarks: Block 11: Fuel Gas = 848.313 mscf and Assist Gas = 94.445 mscf; Block 12: lift Gas Off Field; Block 16: MI and Fuel Gas from Prudhoe
a co u best d my knowledge.
L and a
1 hereby certify mat the
State Production Taxes
tens and Royalty
Note: All volumes must be
corrected to pressure of 14.65 psis
and to a temperature of 60o F.
Authority 90 AAC25 935.
Printed Name Bernard W. Hajny Phone (907)564-5028 Date (3 VA 'Di
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS # CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare ca 1 Hour 0
Total Pars > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 12,498
Continuous Assist 89,115
TOTAL FLARED 101,613
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan -07
VOLUME PLANNED
DATE TIME (MSCFj DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Fine c= 1 Hour 0
Total Flare n 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
iillillIC
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
USBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan -07
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare a 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan -07
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO EUMINATE CAUSE
Total Flan a 1 Hour 0
Total Floe, 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
USBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-07
VOLUME PLANNED
DATE TIME (Meet) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO EUMINATE CAUSE
Total Flare c. 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 157
Continuous Assist 1,125
TOTAL FLARED 1,282
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
USBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-07
VOLUME PLANNED
DATE TIME (Maef) DESCRIPTION OF INCIDENTS 8 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flan a 1 Hour 0
Total Flora > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 115
Continuous Assist 829
TOTAL FLARED 944
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
USBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-07
L
VOLUME PLANNED
DATE TIME (Msef) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare a 1 Hour 0
Total Flom > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 459
Continuous Assist 3,376
TOTAL FLARED 3 ,835
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-07
1 Facility Number
0290000009
2 Facility Name
PBU LISBURNE PROD (GPMA)
3. Field
PBU - GPMA
4 Operator
BP
5. MontNVear of Disposition
( February-2007
Disposition
Volume MCF
20. For production from multiple pools, list Contribution of each pod as a percent of
Total Volume
6. Sold
94,426
Pool Name
Pool Code
Percent
7 . i��
8.269,749
Lisburne
640144
42.3%
Niakuk & West Niakuk
640148
1.2%
8. Furred or vented 1 hour or less
3
North Prudhoe Bay State
640152
0.0%
Pt. McIntyre
640180
54.9%
9 Flared cc vented more than 1 hour (see frisk'.)
0
Raven - Ivishak -Sag River
640147
1.6%
West Beach
640186
0.0%
10 Rot and Purge
11,986
11. Used tor lease operations (specify in Remark')
822,234
12. Other (see instructions)
1,836,974
OAdatUee,QNy a ...
Authorization >1 hr:
Safety
MCF
13. TOTAL VOLUME (ITEMS 612)
9,035,372
Lease Use
MCF
14. NGL Gas Equivalent
94,426
Conservation
f
MCF
15. Purchased gas
0
Waste.
MCF
16. Transferred from:
1,726,993
Commissioner Oak'
17. Transferred to: (Express as a negative 1) CGF
0
18. Remarks: Block 11: Fuel Gas = 735.479 meet and Assist Gas = 86,755 mscf; Block 12: Lift Gas Off Field; Block 16: MI and Fuel Gas from Prudhoe
I hereby [tinny that the foregoing is We and cox to the best of my knowledge
Manager, State Taxes
sigSignature /�.,_ � rem and Royoyalty lty
Note: All volumes 14. be
corrected to pressure asuro of f 14.65 psis
and to a temperature of 600 F.
Authority 20 AAC25.235.
Printed Name Bernard W. Hajny Phone (907)564 -5028 Date 5 /p Y22'
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
•
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
2/25/2007 1643 -1645 3 1800 STV-IP compressor because of schafer valve testing
Total Flare a 1 Hour 3
Total Flare > 1 Hour 0
Volume Flared 3
Measured Safety Pilot 11,192
Continuous Assist 81,013
TOTAL FLARED 92,208
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-07
Unplanned Completed troubleshooting 8 reloaded 1800 T/C
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
2/25/2007 1643 - 1645 0 1800 STV - IP compressor because of Schafer valve testing Unplanned Completed troubleshooting 8 reloaded 1800 T/C
Total Flare a 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-07
VOLUME PLANNED
PATE TIME (MSCF) DESCRIPTION OF INCIDENTS 8 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
2/25/2007 1643 -1645 0 1800 STV -IP compressor because of schafer valve testing Unplanned Completed troubleshooting & reloaded 1800 T/C
Total Flare cr 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAV, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-07
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-07
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
2/25/2007 1643 -1645 0 1800 STV -IP compressor because of =hater valve testing Unplanned Completed troubleshooting & reloaded 1800 T/C
Total Flare a 1 Hour 0
Total Flare n 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
2/2512007 1643 -1645 0 1800 STV -IP compressor because of schafer waive testing Unplanned Completed troublesh0oting & reloaded 1800 T/C
Total Flare c= 1 Hour 0
Torsi Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 126
Continuous Assist 917
TOTAL FLARED 1,043
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-07
Total Flare r_ 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 111
Continuous Assist 802
TOTAL FLARED 913
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-07
VOLUME PLANNED
DATE TIME (Maef) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
2/25/2007 1643 -1645 0 1800 STV -IP compressor because of schafer valve testing Unplanned Completed troubleshooting 8 reloaded 1800 7/C
Total Flare r_ 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 557
Continuous Assist 4.023
TOTAL FLARED 4,580
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-07
VOLUME PLANNED
DATE TIME (Meet) DESCRIPTION OF INCIDENTS 8 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
2/25/2007 1643 -1645 0 1800 STV -IP compressor because of schafer valve testing Unplanned Completed troubleshooting & reloaded 1800 T/C
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD (GPMA)
3. Field
PBU - GPMA
4. Operator
BP
5. Month/Year of Dlspoaltlpn
March - 2007
daposldon
Volume MCF
20. For production from muhiple pools. list contribution 01 each pool as a percent of
Total Volume
8. Solo
96,449
Pod Name
Pool Code
Percent
7 Reinjected
7,020,020
Lisburne
640144
42.3%
Niakuk 8 West Niakuk
640148
1.2%
9. Flared or veined 1 hour or leas
0
North Prudhoe Bay State
640152
0.0 %
PI. McIntyre
640180
54.9%
9 Flared er vented more than 1 hour (see Instr.)
0
Raven • Ivishak - Sag River
640147
1. 8ao
West Beach
640186
0.0%
l Riot and Purge
13,223
11. Used for lease operations (specify in Remarks)
949 265
12. Other (see instructions)
1.969,048
. _.... ,,� , ° . ..€m , a�4AfGof. , • i!
?'w. " . `. ' J' ..
Authorization >1 hr
Safety
MCF
13. TOTAL VOLUME (ITEMS 6-12)
10,048,005
Lease Use
MCF
14. NGL Gas Equivalent
96,449
Conservation
MCF
15. Purchased gas
0
Waste
MCF
16. Transferred Mom:
2,311,939
Date
17. Transferred to: (Express as a negative s) CGF
0
18. Remarks. Block I L Fuel Gas = 809.308 mscf and Assist Gas = 139,957 mscf; Block 12 Lat Gas Off Field; Block 161 MI and Fuel Gas from Prudhoe
I hereby testy that the fo rag Is true and con best of my knowledge.
Manager, State Production Taxes
Note: All volumes must be
corrected to pressure of 14.65 psla
and a AA 2S. 235. F.
Authority 20 AAC 5.
Signature Tine and Royalty
Printed Name Bernard W. Hajny Phone (907)564-5028 Date _ /
Y C �O --z72
Form 10 -422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare r_ 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 12,626
Continuous Assist 133,791
TOTAL FLARED 146,417
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar -07
Total Flare a 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar -07
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS A CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare a 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar -07
Total Flare a 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar -07
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
VOLUME PLANNED
DATE TIME (Msc° DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare a 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 108
Continuous Assist 1,108
TOTAL FLARED 1,216
SP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar -07
VOLUME PLANNED
DATE TIME (Msef) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare a 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 90
Continuous Assist 980
TOTAL FLARED 1,070
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar -07
Total Flare ca 1 Hour 0
Total Flares 1 Hour 0
Volume Flared 0
Measured Safety Pilot 395
Continuous Assist 4,078
TOTAL FLARED 0,073
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar -07
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS 8 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
1. Facility Number
0290000009
2. Facility Name
3 Field
4. Operator
BP
5. MontIVYeac of Disposition
April - 2007
PBU LISBURNE PROD (GPMA)
PBU - GPMA
Disposition
Volume MCF
20. For production from multiple pools. list cont bution of each p001 as a percent of
Total Volume
8. Sold
85,693
Pool Name
Pool Code
Percent
7. Reinjected
6,745,875
Lisburne
640144
42.3%
Niakuk & West Niakuk
640148
1.2%
8. Flared or vented 1 hour or less
0
North Prudhoe Bay State
640152
0.0%
Pt. McIntyre
640180
54.9 °'a
1 hour (see Instr.)
0
Raven - Ivishak - Sap River
640147
1.6%
9. Flared a vented more man
West Beach
640186
0.0%
10. Plot and Purge
12,505
11. Used for lease operations (specify in Remarks)
918,293
.�..__ .�_ _:...
Authorization >1 hr
._
Safety
.
MCF
12. Other (see istmctions)
2,002,681
13. TOTAL VOLUME (ITEMS 6 -12)
9,765,047
Lease Use
MCF
14 NGL Gas Eglivasnt
85,693
Conservation
MCF
15. Purchased gas
0
Waste
MCF
18. Transferred from:
2,287,710
Commissioner Oslo
17. Transferred to: (Erpress as a negative IS CGF
0
18. remarks: Block 1 1 : Fuel Gas = 763,654 inset and Assist Gas = 154,639 mscf; Block 12: Lif Gas Off Field; Block 16: MI and Fuel Gas from Prudhoe
I hereby certify that the f
Signature r ✓/
is true and con the best of my knowledge.
/
Manager, State Production Taxes
title and Royalty
Note: All volumes must be
corrected to pressure of 14.85 pelt, and to a temperature of 60o F.
Authorlty 20 AAC25.235.
Printed Name Bernard W. Hatny P hone (907)564-5028 Date c - 07
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
■
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare r- 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pllot 11,676
Continuous Assist 144,220
TOTAL FLARED 155,896
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr -07
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS A CAUSE UNPLANNED ACTON TAKEN TO ELIMINATE CAUSE
Total Flare a 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
USBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr -07
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Ram a 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
USBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr -07
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare a 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr -07
VOLUME PLANNED
DATE TIME (MSef) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare r_ 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 176
Continuous Assist 2,246
TOTAL FLARED 2,422
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr ,07
VOLUME PLANNED
DATE TIME (Uset) DESCRIP11ON OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare a 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 93
Continuous Assist 1,189
TOTAL FLARED 1,282
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr -07
VOLUME PLANNED
DATE TIME (MscO DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO EUMINATE CAUSE
Total Flare a 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 560
Continuous Assist 6,984
TOTAL FLARED 7,544
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr -07
1 Fadltty Number
0290000009 I PBU
2. Facility Name
LISBURNE PROD (GPMA)
3 Field
PBU - GPMA
14. Operator
I BP
S. MondW eat of Diepdeibdhh
May - 2007
Disposition
Volume MCF
20. For production from multiple pools. list contnbudon of each pool as percent of
Total Volume
8. Sold
88,603
Pod Name
Pool Code
Percent
7. Reinjected
7,343,948
Lisburne
640144
92.7%
Niakuk
640148
2.4%
8. Flared or vented t noun or less
287 1.,"
North Prudhoe Bay State
640152
0.0%
Point McIntyre
640180
0.0%
9. Flared vented nare than 1 hour (see Instr.)
1 312
Ivishak -Saq River test in
640147
5.0° /a
West Beach
640186
0.0%
10. Pad and Purge
12,767 ,�
11. Used for lease operations (specify in Remarks)
1,004,656
" .. - _ - ��:.
.:• 7 '""t
L
12. Other (see instnwrta t
ns) RECE1V
1,876,912
Audronaatlorl >1 hr.
Safety
Ott-,
MCF
13. TOTAL VOLUME (ITEMS 8-12) -BIN 2 2 2007
10,328,485
Lease Use
MCF
14. NGL Gas Equivalent
88,603
Conservation
Mrs
• .- r.• t . r._ - -•.-•• ,
15. Purchased gas Anchorag.
0
Waste:
MCF
16. Transferredlmm:
2,403,844
Commissonar Dte
Co 7- 2 518
17. Transferred to: (Express as a negative n CGF
0
18. Remarks. Block 11: Fuel Gas = 817,612 msct and Assist Gas =187,044 mscf; Block 12: Lif Gas Off Field; Block 16: M/ from Prudhoe = 1,783.844 and Fuel Gas from
Prudhoe = 620,000
I hereby certify that the foregoing is true and correct to the best 01 my knowledge.
! (� Manager, State Production Taxes
Signature Title and Royalty
Note: All volumes must be
corrected to pressure of 14.65 psla
a nd to a temperature of 60o F.
_ Authority 20 AAC25,235.
/ 9A,
Printed Name Bernard W. jny Phone (907)564-5026 Date GA
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
JQ�
Total Flare c= 1 Hour 272
Total Flare r 1 Hour 1,227
Volume Flared 1,499
Measured Safety Pilot 11,831
Continuous Assist 173,482
TOTAL FLARED 186,812
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-07
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/15/2007 0442 -0540 272 Depressured 24 inch common line.
Planned Production Ilowline depreasured.
5/25/2007 0820 -1255 1227 1801 STV -IP shutdown for leaky valve change. Planned Replaced valve and returned tacitly to operations.
Total Flare a 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO, 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-07
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO EUMINATE CAUSE
5/15/2007 0442-0540 0 Depressured 24 inch common line. Planned Production aowline depreseured.
05/25/07 0820 -1255 0 1801 STV -IP shutdown for leaky valve change. Planned Replaced valve and returned facility to operations.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
USBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May -07
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/15/2007 0442 -0540 0 Depmssured 24 inch common kne. Planned Production Towline depressured.
Total Rare a 1 Hour 0
05/25707 0820 -1255 0 1801 STV -IP shutdown for leaky valve Change. Planned Replaced valve and returned facility to operations.
Total Flare > 7 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC.
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/15/2007 0442 -0540 0 Depressured 24 inch common line. Planned Production flowline depreseured.
Total Flare <= 1 Hour 0
05/25/07 0820 0 1801 STV - IP shutdown for leaky valve change. Planned Replaced valve and returned facility to operations.
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Total Flare a 1 Hour 3
Total Flare > 1 Hour 16
Volume Flared 19
Measured Safety Pilot 179
Continuous Assist 2,588
TOTAL FLARED 2,786
SP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY. NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-07
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/15/2007 0442-0540 3 Depressured 24 inch common line. Planned Production bowline depresaured.
05/25 0820.1255 16 1801 STV-IP shutdown for leaky valve change. Planned Replaced valve and retumed facility to operations.
Total Flsre a 1 Hour 3
Total Flare> 1 Hour 11
Volume Flared 14
Measured Safety Pilot 122
Continuous Assist 1,766
TOTAL FLARED 1,902
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-07
VOLUME PLANNED
DATE TIME (Mact) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/15/2007 0442 -0540 3 Depressured 24 inch common line. Planned Production towline depreasured.
05/25/07 0820 -1255 11 1801 STV -IP shutdown for leaky valve change. Planned Replaced valve and returned facility to operatbns.
Total Flare a 1 Hour 12
Total Flare > 1 Hour 58
Volume Flared 70
Measured Safety Pilot 635
Continuous Assist 9,208
TOTAL FLARED 9.913
kna
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May -07
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS 8 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/15/2007 0442 -0540 12 Deoressured 24 inch common line. Planned Production Bowline depressured.
05/2507 0820 -1255 58 1801 STV -IP shutdown for leaky valve change. Planned Replaced valve and returned facility to operations.
Flare Start Date 5/1/2007
Flare End Date 5/31/2007
Report Number
LPC Flare Report
Time Of Flaring
Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume (MSCF)
07 -193 Flare Relief 5/15/2007 4:42:00 AM 5:40:00 AM 58 minutes No Yes Yes BPIWACKSOAD 290
Determination Cause Depressured 24 common -tine.
Action Taken Production flowline depressured
07-208 Flare Relief 5/25/2007 8:20:00 AM 1255:00 PM 275 minutes No No
Determination Cause 1801 STV -IP shutdown for leaky valve change.
Action Taken Replaced valve and facility retumed to normal operations.
Yes
BPI\STROl1OJD 1312
GPB L1 incident
Subject: GPB Ll incident
From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com>
Date: Sun, 06 May 2007 14:22:05 -0800
To: steve mcmains @admin.state.ak.us
CC: "GPB, Environ TL" <GPBEnvironTL@BP.com >, "Fiedler, Anne M" <Anne.Fiedler @bp.com>
"Benson, Gary A" <Gary.Benson @bp.com >, "GPB, Environ Advisor East"
<GPBEnvironAdvisorEast @BP.com >, "GPB, GPMA Fac Engr" <GPBGPMAFacEngr@BP.com >
"GPB, GPMA MTL" <GPBGPMAMTL@bp.com >, "GPB, GPMA OTL"
<GPBGPMAOTL@bp.com >, "GPB, Area Mgr North (Gas Plants/GPMA)"
<GPB_AreaMgrNorth@BP.com>
To: Steve McMains, AOGCC
steve_mcmainsea admin.state.ak.us
907 - 793 -1241, fax 907- 276 -7542
From: Dwight Warner, GPB Field Optimization Engineer
for Hal Tucker, GPB Prod Optimization Team Leader
An uncontrolled gas release occurred on 5 -4 -07 at Lisburne L1 pad when a
tubing line broke off of a flow element that provided motive gas to the system
at L1. The uncontrolled release began at 1321 and ended at 14:11. Bleed
hoses were then hooked up to the downcomers on wells L1 -1, 9, and 15 to
take the system down in a controlled manner beginning at 14:11 to bleed
tanks. The system was bleed down by 18:35 and the incident was considered
over at 18:45. The pad was not on production at the time of the release. This
pad has been shut -in since April 06 due to corrosion on the production line
going to LPC. The estimated volume of the uncontrolled gas released was
36,200 SCF. The estimated total of the controlled bleed down was 188,640
SCF. The total gas volume was 224,840 SCF for the entire event.
If you require additional information, please don't hesitate to call me.
Dwight Wamer
GPB Field Optimization Engineer
(907) 659 -4382
or
Hal Tucker
GPB Prod Optimization Team Leader
(907)- 659 -4472
,1 of 2 5/7,2007 6:19 AM
1. Facility Number
0290000009
12. Facility Kant
PBU LISBURNE PROD (GPMA)
3. Field
14. Operate
(BP
5. MonWsu dpgo■tan
1 June - 2007
PBU - GPMA
Disposition
Volume MCF
20. For production from multiple pods, Ibt contrIbution of each pod as a percent of
Told Volume
e. add
61,541
Pod Name
Pod Cods
Percent
7. Reinjected
7,884,959
Lisburne
640144
80.2%
Niakuk
640148
2.8%
8. Find a vo nW 1 now or Mss
405 .�
Sadlerochit
640150
11.2%
Ivishak -Sag River test in
840147
5.9%
9. FS/Wm vented mee then 1 hour pee let)
37
10. Plot and Purge
12,250 i'
11, Used for lease oPeradorn FitEcrib
I V tv
938,250
Authaization >1 "r
Safety
31
MCF
12. Oerr (eee Inemca is)
2 2 2047
685,395
JUL
13. TOTAL VOLUME (ITEMS 8-12)
9,580,837
L"°° Use
MCF
�yks OS a Gas cons convulsion
14. NOL Gas EQulvwrrt^ --
Mehonos
61,541
Caruervatlen
MCF
15. haucnesed gas
0
Wads:
MCF
18. Thant« red Korn:
2,260,950
/� ,n /
C 9 0:9 " / 7 — Z? --
l .� / J/ 77��^�TY� - � am
17. Trrntened 03: (Ewen as • rlsg■M s) CGF
0
18. Remarks: Block I l: Fuel Gas = 769,820 mscf and Assist Gas = 166,430 nut; Block 12: lift Gas Off Field; Block 16: MI than Pfau = 1,660,950 and Fuel Gas from
Prudhoe = 600,000
I Sentry oMtiy that b to the best or my knowledge.
Manager, State Production Taxes
saran mis and Royalty
Note: All volumes must be
corrected to pressure of 14.65 psis
and to a temperature of 60o F.
Authorttv 20 AAC25.235.
Ported tone Bemard W. H 7` / a)ny Phone (907)564.5028 Dais / - f y 'e 7
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit In Duplicate
cis fa_
DATE TIME
8/182007 1350-1353
620'2007 0243 -0248
8/24/2007 1127 -1130
8/292007 1028 -1109
8/25/1007 1508 -1509
Total Flare a 1 Hour 331
6 1433 -1758
Total Flan > 1 Hour 32
Volume Flared 363
Measured Safety Pilot 9,969
Continuous Assist 136,171
TOTAL FLARED 148,503
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun -07
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
6 STV scrubber to LP flare had opened due to P019 valve malfunction
180 Shutdown 1808 compressor for Shaffer valve work to be done
1 Instability in gas flow to 1800 STVAP from NGL plant maint Shutdown
162 1800 SNAP shutdown due to instrumentation failure with TFD1
2 Gas flow instability to 1800 STVAP caused burp to LP Flare
32 Gas flow instability to 1800 STVAP caused by high ambient temps
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Planned
Unplanned
Unplanned
Unplanned
Flare valve closed
1808 depressurization completed
Stabilized gas How to 1800 STVAP compressor
Started 1801 and stabilized facility process ops
Stabilized gas flow b 1800 STVAP compressor
Unplanned Stabilized gas flow to suction of 1800 STVAP comp
DATE TIME
8/18/2007 1350-1353
0/20/2007 0243 -0248
8/24/2007 1127 -1130
8/25/2007 1028 -1109
825/2007 1508 -1509
Total Fin a 1 Hour 0
06/21/07 1433 - 1756
Total Ftaro> 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
O STV scrubber to LP flare had opened due to P019 valve malfunction Unplanned
O Shutdown 1808 compressor for shaffer valve work to be done Planned
O Instability in gas flow to 1800 SNAP from NGL plant maint. Shutdow Unplanned
O 1800 STVAP shutdown due to instrumentation failure with TFD1 Unplanned
O Gas flow instability to 1800 STV/IP caused burp to LP Flare Unplanned
O Gas Bow instability to 1800 STVAP caused by high ambient temps Unplanned
0
0
0
0
0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-07
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Flare valve closed
1808 depressurization completed
Stabilized gas lbw to 1800 STVAP compressor
Started 1801 and stabilized facility process ops
Stabilized gas lbw to 1800 STVAP compressor
Stabilized gas flow to suction of 1800 STVAP comp
c
8/18/2007 1350 -1353 0
830x2007 0243-0248 0
W24/2007 1127 -1130 0
835/2007 1028 -1109 0
835/2007 1 -1509 0
Total Flan n 1 Hour 0
Total Flare> 1 Hour
Volume Fond
Measured Safety Pllot
Continuous Assist
TOTAL FLARED
0
0
0
0
0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
USBURNE PRODUCTION CENTER
OAS FLARING INCIDENTS
Jun -07
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS 8 CAUSE
PLANNED
UNPLANNED
STV scrubber to LP flare had opened due to P019 valve malfunction Unplanned
Shutdown 1808 compressor for shatter valve wo rk to be done Planned
Instability in gas flow to 1800 SNAP from NGL plant maint. Shutdow Unplanned
1800 STVAP shutdown due to instrumentation failure with TFD1 Unplanned
Gas flow instability to 1900 STVAP caused burp to LP Flare Unplanned
0821/07 1433 -1758 0 Gas flow instability to 1800 STVAP caused by high ambient temps Unplanned
ACTION TAKEN TO ELIMINATE CAUSE
Flare valve closed
1808 depressurization. completed
Stabilized gas flow to 1800 STV/IP compressor
Started 1801 and stabilized facility process tips
Stabilized gas flow to 1800 STVAP compressor
Stabilized gas flow to suction of 1800 STV/IP comp
DATE TIME
8/16/2007 1350 -1353
8/20/2007 0243 -0248
8/24/2007 1127-1130
8/25/2007 1028 -1109
8/2572007 1506
Total Flare a 1 Hour 0
08/21))7 1433 -1758
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
0 Gas flow Instability to 1800 STV/IP caused by high ambient temps Unplanned
0
0
0
0
0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, NORTH PRUDHOE BAY
USBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun -07
PLANNED
UNPLANNED
O STV scrubber to LP flare had opened due to P019 valve malfunction Unplanned
0 Shutdown 1808 compressor for chaffer valve work to be done Planned
O Instability in gas flow to 1800 STVAP from NGL plant maint. Shutdow Unplanned
O 1800 STVAP shutdown due to instrumentation failure with TFD1 Unplanned
0 Gas flow Stability lo 1800 STVAP caused burp to LP Flare Unplanned
ACTION TAKEN TO ELIMINATE CAUSE
Flare valve closed
1800 depressurization completed
Stabilized pas Dow to 1800 STVAP compressor
Started 1801 and stabilized facility process ope
Stabilized gas flow to 1000 STV/IP compressor
Stabilized gas flow to suction of 1800 STV/IP comp
DATE THE
6/16/2007 1350 -1353
6(20/2007 0243-0248
8/24/2007 1127-1130
825/2007 1028 -1109
6/25/2007 1508.1509
Total Flom a 1 Hour 12
08/21/17 1433
Total Flan a 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
VOLUME
(Mott) DESCRIPTION OF INCIDENTS & CAUSE
O STV scrubber to LP flare had opened due to P019 valve malfunction Unplanned
6 Shutdown 1806 compressor for shatter valve work to be done Planned
O Instability In pas flow to 1800 STVAP from NGL plant maint. Shutdow Unplanned
5 1800 STVAP shutdown due to Instrumenta0on failure with TFD1 Unplanned
1 Gas flow instability to 1800 STVAP caused burp to LP Flare Unplanned
1
1
13
237
3,261
3 .511
BP EXPLORA1ION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-07
PLANNED
UNPLANNED
Gas flow instability to 1800 STVAP caused by high ambient temps Unplanned
ACTION TAKEN TO EUMINATE CAUSE
Flare valve closed
1808 depressurization completed
Stabilized pas flow to 1900 STVAP compressor
Started 1801 and stabilized facility process ops
Stabilized gas flow to 1800 STVAP compressor
Stabilized pas flow to suction of 1800 STVAP camp
VOLUME
DATE TIME (Macf) DESCRIPTION OF INCIDENTS & CAUSE
6/16/2007 1350 - 1353 0
8/20/2007 0243-0248 4
8/24/2007 1127 -1130 0
8/25/2007 1028 -1109 4
W25/2007 2007 1506.1509 1
Total Flan a 1 Hour 9
013/21/17 1433 - 1758 1 Gas flow instability to 1800 STVAP caused by high ambient temps Unplanned
Total Flare > 1 Hour 1
Volume Flared 10
Measured Safety Pilot 166
Continuous Assist 2,290
TOTAL FLARED 2.466
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-07
PLANNED
UNPLANNED
STV scrubber to LP flare had opened due to P019 valve malfunction Unplanned
Shutdown 1808 compressor for shatter valve work to be done Planned
Instability in gas flow to 1800 SNAP from NGl plant maint Shutdow Unplanned
1800 SNAP shutdown due to Instrumentation failure with TFD1 Unplanned
Gas flow instability to 1800 STVAP caused burp to LP Flare Unplanned
ACTION TAKEN TO ELIMINATE CAUSE
Flare valve closed
1808 depressurization completed
Stabilized gas flow to 1800 STV/IP compressor
Started 1801 and stabilized facility process cups
Stabilized gas flow to 1800 STVAP compressor
Stabilized gas flow to suction of 1800 STVAP comp
DATE TIME
VOLUME
8/18/2007 1350-1353 0 STV scrubber to LP flare had opened due to P019 valve malfunction Unplanned
820/2007 0243-0248 23 Shutdown 1808 compressor tor chaffer valve work to be done Planned
8/24/2007 1127 - 1130 0 Instability in gas flow to 1800 STVfP from NGL plant maint. SffutdOw Unplanned
8/25/2007 1028 -1109 23 1800 STVAP shutdown due to instrumentation failure wltit TFD1 Unplanned
8/25!2007 1508.1509 1 Gas flow instability to 1800 STVAP caused burp to LP Flare Unplanned
Total Flans a 1 Hour 47
08/21/07 1433 - 1758 4 Gas flow instability to 1800 STV/IP caused by high ambient temps Unplanned
Total Flare > 1 Haul 4
Volume Fined 51
Mwsursd Safety Pilot 844
Continuous Assist 11,885
TOTAL FLARED 12 ,560
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-07
PLANNED
(Mec71 DESCRIPTION OF INCIDENTS 8 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Flare valve closed
1808 depressurization completed
Stabilized gas /low to 1800 STVAP compressor
Started 1801 and stabilized facility process cps
Stabilized gas flow to 1800 SNAP compressor
Stabilized gas lbw to suction of 1800 STVAP comp
DATE TIME
8/182007 1350 -1353
62W2007 0243-0248
0/24/2007 1127 -1130
6/2512007 1028-1109
(/25/2007 15081509
Total Flare ca 1 Hour 8
06/21/07 1433-1756
VOLUME
Total Flats ) 1 Hour 0
Volume Flared 6
Measured Safety Pilot 1,034
Continuous Assist 13.043
TOTAL FLARED 14,083
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-07
PLANNED
(Meer) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
1 STV scrubber to LP flare had opened due to P019 valve malfunction Unplanned
5 Shutdown 1806 compressor for chaffer valve work to be done Planned
0 Instability in gas lbw to 1800 STV/IP from NGL plant maint. Shutdown Unplanned
0 1000 STVAP shutdown due to Instrumentation failure with TFD1 Unplanned
0 Gas flow instability to 1800 STVAP caused burp to LP Flare Unplanned
0 Gas flow iristabiliy to 1800 SNAP caused by high ambient temps Unplanned
Flare valve closed
1808 depressurization completed
Stabilized gas flow to 1800 STVAP compressor
Started 1801 and stabilized faclity process cps
Stabilized pas flow to 1800 STVAP compressor
Stabilized gas flow to suction of 1800 STVAP conic
Flare Start Date 6/1 /2007
Flare End Date 82007
LPC Flare Report
Time Of Flaring
Report System Date Start Time Stop Time Duration Intermittent - Black Smoke - Planned Reported By Volume (MSCF)
07.248 Flare Relief 820/2007 2:43:00 AM 2:48:00 AM 5 minutes No No Ves BPIISCHRADDG
Determination Cause We shutdown 1808 Reinjection compressor for chaffer valve work to
be done.
Action Taken
1808 depressurization competed.
07 Flare Relief 6/21/2007 2:33:00 PM 5:56:00 PM 203 minutes Yes No No BP1 VANSONTL
Determination Cause High ambient air temperature lead to gas now stability issues to suction
o1 1800 STY compressor, causing intermittent venting to LP Flare.
Action Taken Vent time and accumulated vent volume: 1433(hr) /.42(mscfd); 1442/1
66; 1453/3.83; 1454/4.32; 1503/482 1504/8.59; 1505/11.48; 1508/13
95; 1507/15.6; 1523/15 1554/16.86; 1555/1718; 1601/18.84;
1802 /21.89: 162622.22; 1827/22 38. 1632/22.47; 1633/25.13; 1634/27
92; 1635/31.53; 1638/34.71; 1637/35.87; 1756/38.3
Sfablize gas flow to suction of 1800 ST/ compressor.
198
38
Subject: GPB Gas Flaring Incident
From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com>
Date: Fri, 22 Jun 2007 08:49 :33 -0800
To: steve mcmains@admin.state.ak.us
CC: "GPB, Environ TL" <GPBEnvironTL@BP.com >, "GPB, Environ Advisor East"
<GPBEnvironAdvisorEast@BP.com>, "GPB, Environ Advisor West"
<GPBEnvironAdvisorWest@BP.com>, "Fiedler, Anne M" <Anne.Fiedler@bp.com>,'Benson, Gary
A" <Gary.Benson@bp.com >, "Pfeiffer, Tim A" <Tnn.Pfeiffer@bp.com >, "Kurz, John"
<john.kurz@bp.com>, "GPB, GC OTL" <GPBGCIOTL @bp.com >, "GPB, FSl OTL"
<GPBFSIOTL @bp.com>, "GPB, FS3 OTL" <GPBFS3OTL@bp.com>, "GPB, GPMA 011."
<GPBGPMAOTL @bp.com>, "GPB, Area Mgr Central (GCl /3/FS3)"
<GPBAreaMgrCentral@BP.com>, "GPB, Area Mgr East (FS t /2/COTU /Seawater)"
<GPBAreaMgrEastFS I2CS@BP.com >, "GPB, Area Mgr North (Gas Plants/GPMA)"
<GPB_AreaMgrNorth@BP.com>, "GPB, Optimization Engr" <GPBOptimizationEngr@BP.com>
steve mcmainseadmin.state.ak.us
907- 276 -7542
Team Leader
To: Steve McMains, AOGCC
907 - 793 -1241, fax
From: Hal Tucker, GPB Prod Optimization
Extended flaring events occurred at four
GPB facilities on June 21 due to high ambient temperature (- 70 deg).
The high ambient caused problems with the stability of the 2nd and 3rd
stage compression at FS1, FS3, GC1 and GPMA. flaring occurred as
follows:
FS1 14:59 to 16:00 (61 minutes), total
volume flared was 2200 MSCF;
FS3 09:15 to 12:35 (200 minutes,
intermittent), total volume flared was 1154 MSCF;
GC1 13:40 to 15:59 (139 minutes), total
volume flared was 676 MSCF;
GPMA 14:33 to 17:56 (203 minutes,
intermittent), total volume flared was 38 MSCF.
If you require additional information,
please don't hesitate to call me.
Hal Tucker
GPB Prod Optimization Team Leader
(907) 659 -4472
winmail.dat Content -Type: applcation/ms -tnef
Content - Encoding: base64
I d 6/22/2007 9:34 AM
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD (GPMA)
3 Fteld
PBU - GPMA
4. Operator
BP
5. Month/Year of Disposition
July -2007
Disposition
Volume MCF
/
20 For production lean multiple pools, list contribution of each pool as percent of
Total Volume.
6 Sold
39.317
Pool Name
P001 Code
Percent
7. Reinjected
6,559,416
Lisburne
640144
89.8%
Niakuk
640148
2.8%
6 Flared a vented 1 now o less
746
North Prudhoe Bay State
640152
0.0%
Sadlerochit
640150
5.2%
1 110i/ (see inst.)
a*.1 -V�r
� ,
21/?''' ,
Point McIntyre
640180
0.0%
9 Fl a ared vented than an
Ivishak-Sag River test in
640147
2.2%
10 PlIot and Purge
12,663
West Beath
640186
0.0%
11. Used to lease operations (specify in Remerits)
932,098
12. Omer (see inssltct ns)
1,078,723
Official use S
'Authorization >1 hr
N Safe
Q
MCF
13. TOTAL VOLUME (ITEMS 0-12)
6,623,250
Lease Use
MCF
14 NGL Gas Equivalent
39.317
Conservation
MCF
15. Pathasedgas
0
Waste
MCF
16. Transferred from:
2,204,732
/,!L D
dial /
q // -
miner Dare
17. Transferred t: (Egress as a negative a) CGF
0
16. Ramada. Block 11: Furl Gt.= 733,215 msct and Assisi Gas = 198,883 mscf; Block 12: Lit Gas Off Field; Block 16: MI from Prudhoe = 1.584,732 and Fuel Gas Gun
Prudhoe = 620,000
I hereby certify that the foregoing is true dna Correct to best ut my MgeAedge
Manager, State Production Taxes
Signature �/ Tae and Royalty
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 60o F.
Auttlor(ty 20 AAC25.235.
Printed Name Bernard W. Hajny Phone (907)564-5029 Date /p /4 -o >
•
Fond 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
7/7/2007 0200-0207
7/7/2007 0250-0256
7/7/2007 0459 -0505
7/7/2007 1351 -1357
"7/7/2007 1711 -1719
7/9/2007 1147 -1152
\ 7/9/2007 1222 -1227
<7/29/2007 1504 -1513
7/29/2007 1516 -1552
Total Flare a 1 Hour 694
Total Flare > 1 Hour 277
Volume Flared 971
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
206 1808 compressor shutdown for wash
4 1808 compressor shutdown for wash
59 1808 compressor shutdown for wash
68 1808 compressor shutdown for wash
217 1808 compressor shutdown for wash
2 1807 compressor depressured while troubleshooting
3 1807 Compressor depressured while troubleshooting
13 1800 STV /IP shutdown due to high level suction scrubber
124 1800 STV /IP pre -start purge
7/29/2007 0448.0648 277 Depressured 24 common line for valve replacement
11,414
160.232
192,617
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul -07
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Flare valve closed
Flare valve dosed
Flare valve closed
Flare valve dosed
Flare valve closed
Flare valve closed
Flare valve closed
Lowered level in scrubber and re -start turbine
Started 1800 STV/IP
Unplanned Production bowline depressured
DATE TIME
7/7/2007 0200-0207
7/7/2007 0250 -0256
7/7/2007 0459-0505
7/7/2007 1351 -1357
7/7/2007 1711 -1719
7/9/2007 1147 -1152
7/9/2007 1222 -1227
7/29/2007 1504 -1513
7/29/2007 1516 -1552
Total Flare a 1 Hour 0
Total Flare a 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
VO
(M
0
0
0
0
0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul -07
UME
CF) DESCRIPTION OF INCIDENTS 8 CAUSE
1808 compressor shutdown for wash
1808 compressor shutdown for wash
1808 compressor shutdown for wash
1808 compressor shutdown for wash
1808 compressor shutdown for wash
1807 compressor depressured while troubleshooting
1807 compressor depressured while troubleshooting
1800 STV /IP shutdown due to high level suction scrubber
1800 STV/IP pre -start purge
07/29/07 0448-0648 0 Depressured 24 common line for valve replacement
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Flare valve closed
Flare valve closed
Flare valve dosed
Flare valve dosed
Flare valve dosed
Flare valve closed
Rare valve closed
Lowered level in scrubber and re -start turbine
Started 1800 STV /IP
Production Bowline depressured
DATE TIME
7/7/2007 0200-0207
7/7/2007 0250-0256
7/7/2007 0459 -0505
7/7/2007 1351 -1357
7/7/2007 1711 -1719
7/9/2007 1147 -1152
7/9/2007 1222 -1227
7/29/2007 1504 -1513
7/29/2007 1516 -1552
Total Flare a 1 Hour 0
07/29/07 0446-0648
Total Flare 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
0 1808 compressor shutdown for wash
0 1808 compressor shutdown for wash
0 1808 compressor shutdown for wash
0 1808 compressor shutdown for wash
O 1808 compressor shutdown for wash
0 1807 Compressor depressured while troubleshooting
O 1807 compressor depressured while troubleshooting
0 1800 STV /IP shutdown due to high level suction scrubber
O 1800 STVIIP pre -start purge
O Depressured 24 common Me for valve replacement
0
0
0
0
0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul-07
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Flare valve closed
Flare valve closed
Flare valve closed
Flare valve closed
Flare valve closed
Flare valve dosed
Flare valve dosed
Lowered level in scrubber and re - start turbine
Started 1800 STV /IP
Production Bowline depressured
DATE TIME
7/7/2007 0200-0207
7/7/2007 0250-0256
7 /7/2007 0459-0505
7 /7/2007 1351 -1357
7/7/2007 1711 -1719
7/9 /2007 1147 -1152
7/9/2007 1222 -1227
7 /29 /2007 1504-1513
7 /29/2007 1516 -1552
VO
( M
Total Flare c= 1 Hour 0
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
0
0
0
0
0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul-07
UME
CF) DESCRIPTION OF INCIDENTS & CAUSE
1808 compressor shutdown for wash
1808 compressor shutdown for wash
1808 compressor shutdown for wash
1808 compressor shutdown for wash
1808 compressor shutdown for wash
1807 compressor depressured while troubleshooting
1807 compressor depressured while troubleshooting
1800 STV /IP shutdown due to high level suction scrubber
1800 STV/IP pre -start purge
07/29/07 0446 0 Depressured 24 common line for valve replacement
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Flare valve closed
Flare valve dosed
Flare valve closed
Flare valve closed
Flare valve closed
Flare valve dosed
Flare valve dosed
Lowered level in scrubber and re -start turbine
Started 1800 STV/IP
Production flowline depressured
7/7/2007 0200 -0207
7/7/2007 0250-0256
7/7/2007 0459 -0505
7/7/2007 1351 -1357
7/7/2007 1711 -1719
7/9/2007 1147 -1152
7/9/2007 1222 -1227
7/29/2007 1504 -1513
7/29/2007 1516 -1552
Total Flare a 1 Hour 13
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
3
16
215
3.509
3 .740
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul-07
VOLUME
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE
6 1808 compressor shutdown for wash
O 1808 compressor shutdown for wash
0 1808 compressor shutdown for wash
O 1808 compressor shutdown for wash
6 1808 compressor shutdown for wash
0 1807 compressor depressured while troubleshooting
O 1807 compressor depressured while troubleshooting
O 1800 SNAP shutdown due to high level suction scrubber
1 1800 SWAP pre -start purge
07/29/07 0446-0648 3 Depressured 24 common line for valve replacement
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Flare valve dosed
Flare valve closed
Flare valve dosed
Flare valve dosed
Flare valve dosed
Flare valve closed
Flare valve dosed
Lowered level in saviors and re -start turbine
Started 1800 STV/IP
Production Bowline depressured
DATE TIME
7/7/2007 0200-0207
7/7/2007 0250 -0256
7/7/2007 0459 -0505
7/7/2007 1351 -1357
7/7/2007 1711 -1719
7/9/2007 1147 -1152
7/9/2007 1222 -1227
7/29/2007 1504 -1513
7/29/2007 1516 -1552
Total Flare a 1 Hour 9
07/29/07 0446-0648
Total Flare > 1 Hour 3
Volume Flared 12
Measured Safety Pilot 164
Continuous Assist 2,621
TOTAL FLARED 2 ,797
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul -07
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
4 1808 compressor shutdown for wash
0 1808 compressor shutdown for wash
O 1808 compressor shutdown for wash
O 1808 compressor shutdown for wash
4 1808 compressor shutdown for wash
O 1807 compressor depressured while troubleshooting
O 1807 compressor depressured while troubleshooting
O 1800 STV /IP shutdown due to high level suction scrubber
1 1300 STV /IP pre -start purge
3 Depressured 24 Common line for valve replacement
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Flare valve dined
Flare valve closed
Flare valve closed
Flare valve dosed
Flare valve dosed
Flare valve closed
Flare valve dosed
Lowered level in saubber and re-start turbine
Started 1800 STV /IP
Production flowline depressured
VOLUME
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE
7/7/2007 0200-0207
7/7/2007 0250-0256
7/7/2007 0459 -0505
7/7/2007 1351 -1357
7/7/2007 1711 -1719
7/9/2007 1147 -1152
7/9/2007 1222 -1227
7/29/2007 1504-1513
7/29/2007 1516 -1552
Total Flare 4 = 1 Hour 30
07/29/07 0446-0648 1 Depressured 24 common line to valve replacement
Total Flare > 1 Hour 1
Volume Flared 31
Measured Safety Pilot 338
Continuous Assist 6,071
TOTAL FLARED 6,440
BP EXPLORATION ALASKA, INC.
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul-07
12 1808 compressor shutdown for wash
1 1808 compressor shutdown for wash
2 1808 compressor shutdown for wash
2 1806 Compressor shutdown for wash
13 1808 Compressor shutdown for wash
0 1807 compressor depressured while troubleshooting
0 1807 compressor depressured while troubleshooting
0 1800 SNAP shutdown due to high level suction scrubber
0 1800 STV /IP pre - start purge
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Flare valve dosed
Flare valve dosed
Flare valve dosed
Flare valve closed
Flare valve closed
Flare valve dosed
Flare valve closed
Lowered level in scrubber and re -start turbine
Started 1800 STV/IP
Unplanned Production Bowline depressured
Flare Start Date 7/1/2007
Flare End Date 7/31/2007
LPC Flare Report
Time Of Flaring
Report System Date Start Time Stop Time Duration Intermittent - Black Smoke - Planned Reported By Volume (MSCF)
07 -302 Flare Relief 7/29/2007 4:46:00 AM 6:4890 AM 122 minutes No
Determination Cause Depressured 24 common -line for valve replacement.
This is an estimated volume.
Action Taken Production Bowline depressured.
No No BPI \RENNEVN
290 ✓
nib
GPB Gas Venting Incident and Flaring Incident Page 1 of' 1
McMains, Stephen E (DOA)
From: GPB, Prod Opt TL [GPBProdOptTLQa BP.com]
Sent:
To:
8/2/2007
Thursday, August 02, 2007 12:00 PM
McMains, Stephen E (DOA)
Cc: GPB, Environ TL; GPB, Environ Advisor East; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A;
Kurz, John; GPB, FS1 OTL; GPB, Area Mgr East (FS1 /2 /COTU /Seawater); GPB, Area Mgr North
(Gas Plants/GPMA); GPB, GPMA OTL; GPB, GPMA MTL
Subject: GPB Gas Venting Incident and Flaring Incident
To: Steve McMains, AOGCC
steve_mcmains@admin.state.ak.us
907-793-1241, fax 907 - 276 -7542
From: Dwight Wamer, GPB Prod Optim Team Leader
Gas venting occurred at WGI on July 30, 2007. Approximately 2.8 MMSCF of gas was
vented from the WGI supply line for safed out to repair valve 6605 on the manifold at
WGI. During this time WGI -06 and WGI -08 were both safed out for tree replacements.
An extended flare event occurred on July 29, 2007 at LPC. This event was due to
depressurizing the 24" common-Une for valve replacement.
Flaring began at 04:46 and ended at 06:48 (122 minutes). The volume was estimated
to be 290 MSCF.
If you require additional information, please don't hesitate to call me.
Dwight Warner
GPB Production Optimization TL
(907) 659 -4472
I. Facilty Number
0290000009
2. Facility Name
3. Field
P611- GPMA
Operator
Ia.
5. Month/Year of Disposition
August -2007
PBU LISBURNE PROD (GPMA)
Disposition
Volume MCF
20. For production from mtieple poos, list cwrtnbubon d ead) 0001311 a percent 01
Toter volume
8. sole
83,432
Pool Name
Pod Cade
Percent
7. Reinjected
8,691,873
Lisburne
640144
65.5%
Niakuk
640148
2.0%
a axed or yxmM 1 hour w less
0
North Prudhoe Bay State
640152
0.0%
Sadlerochit
640150
3.7%
9. Flared or vented mare than 1 hour (see last)
0
Pant McIntyre
640180
28.4%
Ivishak -Sag River test in
640147
0.4%
to. Plot and Purge
12,570
West Beach
640186
0.0%
11. used rw lead aperatiats (specify IS Remarks)
1,013,383
12. Other Mee insoucuao)
1,374.446
Cadet Use Ores
AuU1or¢aoon >1 IT,
Safety
13. TOTAL VOLUME (REMS 6
11,175,704
Lease Use
14. NGL Gas Equivalent
83,432
Conservation
15. Purchased gas
0
Waste:
MCF
it Transferred hen:
2,096,317
Commissioner Date
17. Transferred to: (Express as a negative a) CGF
0
18. Remarks: Block 1 I: Fud Gas = 833,758 mscr and Assist Gas = 179,625 msct; Block 12: Li t Gas Ott Field; Block 16: Ml tram Prudhoe = 1.476,317 and Fuel Gas (runt
Prudhoe = 620,000
I hereby pinny Tel the is true / the my best Y knoaAedhe.
Manager, State Production Taxes
Signature_ Tab and Royalty
Note: All volumes must be
corrected to pressure of 14.65 pata
and to a temperature of 60o F.
Authority 20 AAC25.235.
Prim ed Name Bemard W.
� _
Flajny Phone (907)564 - 5028 Date � /? - 0 ?
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
•
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare a 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 8,244
Continuous Assist 117,597
TOTAL FLARED 125,841
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-07
fa
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 3,554
Continuous Assist 51,064
TOTAL FLARED 54,618
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-07
e.
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare a 1 Hour 0
Total Flare a 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug -07
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS 8 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare a 1 Hour 0
Total Flare, 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug -07
O.
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO EUMINATE CAUSE
Total Flare a 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 138
Continuous Assist 1,966
TOTAL FLARED 2,104
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-07
VOLUME PLANNED
DATE TIME (Mut) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare a 1 Hour 0
Total Flare ' 1 Hour 0
Volume Flared 0
Measured Safety Pilot 115
Continuous Assist 1 ,644
TOTAL FLARED 1 ,759
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-07
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare a 1 Hour 0
Total Flare ' 1 Hour 0
Volume Flared 0
Measured Safety Pilot 51
Continuous Assist 733
TOTAL FLARED 784
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-07
1 Facitty Number
0290000009
2 Facility Name
PBU LISBURNE PROD (GPMA)
3 Field
PBU - GPMA
4 Operator
BP
5 MonavYear or Disposition
September -2007
Disposition
Volume MCF
I
20. For production tram multiple pods, list contnbution of each pod as a percent of
Tout Volume
e. Sold
89,509
Pool Name
Pool Code
Percent
7 neeyected
9,422,973
Lisburne
640144
43.So�
1.7%
Niakuk
640148
8. Flared or vented 1 hour a leas
1,055 v
North Prudhoe Bay State
640152
0.0%
Sadlerochil
640150
1.9%
9 Flared or vented more than 1 hour (see alstr.)
37 ✓
Point McIntyre
640180
49.1%
Ivishak -Sag River test in
640147
3.8%
10 Not and verge
11.572
West Beach
640186
0.0%
11 Used for lease overmans 'specify in Remarks)
973.645
12. Otter (see atstuctlam)
1.397.291
Official Use Only
Authorization A tv.
Satiety
37
MCF
13. TOTAL VOLUME (ITEMS 6 -12)
11,896,082
Lease the
MCF
14 NOL Gas Equivalent
89,509
Conservation
MCF
15. Pumased gas
0
Waste
MCF
16. Transferred hoar
2,349,619
te /.n/
CF"+°t -�G� j K�/
/ /
— O,
. d b. (Express as a negative a) CGF
17 Transferrer!
0
18. Remarks: Blink 11. Fuel Gas = 793,697 Mad and Assist Gas = 179,94S inset; Block 12: Lil Gas Oft Field; Block lb: MI iron Prudhoe = 1,790,895 and Fuel Gas truer
Prudhoe = 558.724
I hereby certify mat the foregoing is true and correct to the best of my ktpdadge.
n. Manager, State
S R o n Taxes
Signature are l� ` q"." J c ��}�.y� Tine and oyalty
Note: corrected t o r vlumes be
of 1 4.6 5
o
o prssure f 15 psia
of
and Authority to a temperature 20 AA C25.260o F.
95.
- €T"
Panted Name Bernard W. Haj 1 �` Phone ( 907)554 - 502e Dare (� V
•
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
9/10/2007 1139 -1218 193
9/13/2007 0433-0455 53
9/29/2007 0808-0812 146
9/29/2007 1241 -1251 68
Total Flare r 1 Hour 460
Total Flare> 1 Hour 37
Volume Flared 497
Measured Safety Pilot 5,253
Continuous Assist 81,906
TOTAL FLARED 87,656
BP EXPLORATION ALASKA. INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep - 07
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
1800 STV compressor shutdown. excess suction scrubber level
1801 STV compressor shutdown due to process upset
LPC Plant SESDBESD/OSD emergency shutdown system testing
LPC Plant SESDBESD/OSD emergency shutdown system testing
9/30/2007 2222 - 2359 37 LPC starting up after SESDBESD /OSD system testing
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Planned
Planned
Started offline T /C, stabilized facility operation
Equipment restarted
Depressuring completed
Depressuring completed
Planned Depressurization completed
9/10/2007 1139 -1218
9/13/2007 0433-0455
9/29/2007 0808-0812
9/29/2007 1241 -1251
Total Flare a 1 Hour 487
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
0
487
5,487
85,006
90,980
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY. POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-07
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS 8 CAUSE
50 1800 STV Compressor shutdown, excess suction scrubber level
87 1801 STV compressor shutdown due to process upset
238 LPC Plant SESD/BESD /OSD emergency shutdown system testing
112 LPC Plant SESD/BESD/OSD emergency shutdown system testing
09/30/07 2222 -2359 0 LPC starting up after SESD/BESD /OSD system testing
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Planned
Planned
Planned
•
Started offline TIC, stabaized facility operation
Equipment restarted
Depressuring completed
Depressuring completed
Depressurization completed
9/10/2007 1139 -1218 0
9/1312007 0433 -0455 0
9/29/2007 0808-0812 0
9/29/2007 1241 -1251 0
Total Flare c= 7 Hour 0
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
0
0
0
0
0
8P EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAN, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep -07
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS 8 CAUSE
1800 STV compressor shutdown, excess suction scrubber level
1801 STV Compressor shutdown due to process upset
LPC Plant SESD/BESD /OSD emergency shutdown system testing
LPC Plant SESD/BESD/OSD emergency shutdown system testing
09/30 2997 -2359 0 LPC starting up after SESDiBESD /OSD system testing
PLANNED
UNPLANNED
Unplanned
Unplanned
Planned
Planned
Planned
ACTION TAKEN TO ELIMINATE CAUSE
Started offline T /C, stabilized facility operation
Equipment restarted
Depressuring completed
Depressuring completed
Depressurization completed
DATE
Total Flare « 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-07
VOLUME
TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
9/10/2007 1139 -1218 0 1800 STV compressor shutdown, excess suction scrubber level
9/13/2007 0433 -0455 0 1801 STV compressor shutdown due to process upset
9/29/2007 0808 -0812 0 LPC Plant SESD/BESD/OSD emergency shutdown system testing
9/29/2007 1241 -1251 0 LPC Plant SESDBESD/OSO emergency shutdown system testing
09/30/07 9722 -2359 0 LPC starting up after SESDBESD/OSD system testing
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Planned
Planned
Planned
Started offline T /C, stabilized tadity operation
Equipment restarted
Depressuring completed
Depressuring completed
Depressurization completed
9/10/2007 1139 -1218 2
9/13/2007 0433 -0455 2
9/29/2007 0808 -0812 2
9/29/2007 1241 -1251 0
Total Flare c= 1 Hour 6
09/30/07 2222 -2359
Total Flare> 1 Hour 0
Volume Flared 6
Measured Safety Pilot 109
Continuous Assist 1,697
TOTAL FLARED 1,812
HP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep -07
VOLUME
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS 8 CAUSE
1800 STV compressor shutdown, excess suction scrubber level
1801 STV compressor shutdown due to process upset
LPC Plant SESD /BESD /OSD emergency shutdown system testing
LPC Plant SESD/BESD/OSD emergency shutdown system testing
0 LPC starting up after SESD/BESD/OSD system testing
PLANNED
UNPLANNED
Unplanned
Unplanned
Planned
Planned
Planned
ACTION TAKEN TO ELIMINATE CAUSE
Started offine VC. stabilized facility operation
Equipment restarted
Depressuring completed
Depressuring completed
Depressurization completed
9/10/2007 1139 -1218 2
9/13/2007 0433 -0455 1
9/29/2007 0808-0812 2
9/29/2007 1241 -1251 1
Total Flare c= 1 Hour 6
Total Flare> 1 Hour 0
Volume Flared 6
Measured Safety Pilot 81
Continuous Assist 1,263
TOTAL FLARED 1,350
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep -07
VOLUME
DATE TIME (Mscl) DESCRIPTION OF INCIDENTS & CAUSE
1800 STV compressor shutdown, excess suction scrubber level
1801 STV compressor shutdown due to process upset
LPC Plant SESD/BESD/OSD emergency shutdown system testing
LPC Plant SESD /BESD/OSD emergency shutdown system testing
09/301/07 2222 -2359 0 LPC starting up after SESDBESD/OSO system testing
PLANNED
UNPLANNED
Unplanned
Unplanned
Planned
Planned
Planned
ACTION TAKEN TO ELIMINATE CAUSE
Started offine T /C, stabilized facility operation
Equipment restarted
Depressudng completed
Depressuring completed
Depressurization completed
Total Flare c= 1 Hour 83
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
910/2007 1139 -1218 10
9/13/2007 0433-0455 7
9/29/2007 0808-0812 45
9/29/2007 1241 -1251 21
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-07
VOLUME
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS 8 CAUSE
Total Flare> 1 Hour 0
Volume Flared 83
Measured Safety Pilot 440
Continuous Assist 6,798
TOTAL FLARED 7,321
1800 STV compressor shutdown, excess suction scrubber level
1801 STV compressor shutdown due to process upset
LPC Plant SESD/BESD /OSD emergency shutdown system testing
LPC Plant SESDBESD/OSD emergency shutdown system testing
09/30/07 2222 -2359 0 LPC starting up after SESD/BESD/OSD system testing
PLANNED
UNPLANNED
Unplanned
Unplanned
Planned
Planned
Planned
ACTION TAKEN TO ELIMINATE CAUSE
Started offline T /C, stabilized facility operation
Equipment restarted
Depressuring completed
Depressuring completed
Depressurization completed
Flare Start Date 9/1/2007
Flare End Date 9/30/2007
Time 01 Flaring
Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF)
07-402 Other 9/29/2007 8:08:00 AM 812-'00 AM 4 minutes No Yes Yes BPI \WARNEROW 433
Determination Cause LPC Plant SESDBESD /OSD (Emergency Shutdown) Testing. Black
Smoke time start, 08:09 hrs ending at 08:12 hrs.
Depressuring completed.
07 -402 Otter 9/29/2007 12:41:00 PM 12.51:00 PM 10 minutes No Yes Yes BP1 \WARNERDW 202
Determination Cause LPC Plant SESDBESD /OSD (Emergency Shutdown) Testing.
Action Taken Depressuring competed.
Action Taken
LPC Flare Report
Daily Volume (MSCF) 635
07 -411 Omer W30/2007 1022:00 PM 11 PM 97 minutes No No Yes BP1 \CATESOR 37
Determination Cause Plant starting up atter BESD/SESD /OSD Safety system testing.
Action Taken Depressurization competed.
Faality Number
0290000009
2 Facility Name
I1
PBU LISBURNE PROD (GPMA)
3. Field ld
PBU - GPMA
4 Operator(
BP
15 Month/Year of Disposition
October -2007
Disposition
Volume MCF
20. For production tram multiple pools. list contribution of sate pool as a percant of
Total Volume
6 Sold
131,485
Pool Name
Pool Code
Percent
7. Reenacted
11,107,687
Lisburne
640144
45.0%
Niakuk
640148
1.9%
6. Flared a vented 1 trove or bas
1,898
North Prudhoe Bay State
640152
0.0%
Sadlerochit
640150
0.0%
1 hour (see nstr.)
0
Point McIntyre
640180
52.9%
9. Flared or than more an
Ivishak - Sap River test in
640147
0.2%
w. Pea and Purge
12,240
West Beach
640186
0.0%
11 Used for base operations (specdy el Remarks)
1 047 858
12 Other (see instructions)
1,286,638
018098 .
Authorization >1 hr.
Sate h
MCF
13. TOTAL VOLUME (ITEMS 6-12)
13,587,606
Lease Use
MCF
14. NGL Gas Equivalent
131,485
Conservation
MCF
15. Purchased gas
0
Waste.
MCF
16. Transferred from
3,444,784
Car6Mesianr pate
17. Transferred to: (Ewe's as a negative al CGF
0
18. Remarks. Black 11 Fuel Gas = 853,608 mscf and Assisi Gas = 194,050 mscf; Block 12: Litt Gas Off Field; Block 16: MI from Prudhoe = 2,659,866 and Fuel Gas from
Prudhoe = 784.918
i heresy cerhty mar me lorrrgang le true ana Correct to the best Of my knowledge
Manager, State Production Taxes
Signature f �J . is rS _ Tele and Royalty
Note:
corrected
All volumes must be
to pressure of 14.65 pale
a temperature of 60o F.
20 AAC25.235.
r
Printed Name Bernard W.
11h /
Hajny Phone (907)564-502e Date O
end to
Authority
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
AGILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
10/1/2007 0157 -0221
10/1/2007 0606 -0859
10/1/2007 2138 -2140
10/6/2007 0007-0041
10/6/2007 0921 -0924
10/31/2007 0213 -0217
10/31/2007 1736
Total Ram c= 1 Hour 977
Total Flare > 1 Hour 0
Volume Flared 977
Measured Safety Pilot 5,550
Continuous Assist 88,003
TOTAL FLARED 94,530
BP EXPLORATION ALASKA, INC.
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-07
48 1801 STVAP Compressor start purge
127 1801 STVAP Compressor shutdown for unknown reason
33 1808 reinjection compressor start-up purge
382 PO2003SV HP relief valve on 24' common tine tailed
31 P020038V HP releit valve on 24' common line failed
164 1807 T/C shutdown due to merit. causing flaring thru HP valves
192 1808 TIC shutdown due to main. causing flaring thru HP valves
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Flare valves closed after purge sequence
Restarted 1801 compressor
Flare valves closed after purge sequence
P02003SV was blocked in
P2003SV repaired and returned to service
Compressor completed depressurizing
Compressor completed depressurizing
DATE TIME
10/1/2007 0157 -0221
10/1/2007 0606 -0659
10/1/2007 2138-2140
10/6/2007 0007 -0041
10/6/2007 0921 -0924
10/31/2007 0213-0217
10/31/2007 1736 -1741
Total Flare <= 1 Hour 868
Total Flare > 1 Hour 0
Volume Flared 888
Measured Safety Pilot 6,427
Continuous Assist 101,892
TOTAL FLARED 109,187
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY. POINT MCINTVRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-07
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
68 1801 STV/1P Compressor start-up purge
147 1801 STVAP Compressor shutdown for unknown reason
45 1808 reinjection compressor start-up purge
455 P02003SV HP relief valve on 24 common line tailed
36 P02003SV HP releit valve on 24' common line tailed
55 1807 T/C shutdown due to maint. causing flaring thru HP valves
62 1808 TIC shutdown due to maint. causing flaring thru HP valves
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Flare valves closed alter purge sequence
Restarted 1801 compressor
Flare valves dosed after purge sequence
P02003SV was blocked in
P2003SV repaired and returned to service
Compressor completed depressurizing
Compressor completed depressurizing
IP
10/1 /2007 0157 -0221 0
1011/2007 0606-0659 0
10/1/2007 2138 -2140 0
10/6/2007 0007 -0041 0
10/6/2007 0921 -0924 0
10/31/2007 0213 -0217 0
10/31 /2007 1736 -1741 0
Total Flare c= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct -07
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
1801 SNAP Compressor start -up purge
1801 STV/IP Compressor shutdown for unknown reason
1808 reinjection compressor start-up purge
P02003SV HP relief valve on 24" common line failed
P02003SV HP releif valve on 24• common line failed
1807 T/C shutdown due to main. causing flaring thru HP valves
1808 PC shutdown due to main. causing flaring thru HP valves
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Flare valves closed after purge sequence
Restarted 1801 compressor
Flare valves closed after purge sequence
P02003SV was blocked in
P2003SV repaired and retumed to service
Compressor completed depressurizing
Compressor completed depressurizing
VOLUME
DATE TIME (MSCF)
10/1/2007 0157 - 0221 0
10/1/2007 0606-0659 0
10/1/2007 2138-2140 0
10/6/2007 0007-0041 0
10/6/2007 0921 0
10/31/2007 0213 - 0217 0
10/31/2007 1736-1741 0
Total flare c= 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
0
0
0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct -07
DESCRIPTION OF INCIDENTS & CAUSE
1801 SNAP Compressor start-up purge
1801 STV/IP Compressor shutdown for unknown reason
1808 reinjection compressor stall -up purge
P02003SV HP relief valve on 24' common line failed
P02003SV HP releit valve an 24' common line failed
1807 T/C shutdown due to maint. causing flaring thru HP valves
1808 T/C shutdown due to main. causing flaring thru HP valves
PLANNED
UNPLANNED ACT ION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Rare valves closed alter purge sequence
Hastened 1801 compressor
Ate valves closed after purge sequence
P02003SV was blocked M
P2003SV repaired and returned to service
Compressor completed depressurizing
Compressor completed depressurizing
VOLUME
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS b CAUSE
10/1/2007 0157-0221 1
10/1/2007 0608 -0659 2
10/1/2007 2138 -2140 0
10/6/2007 0007-0041 5
10/6/2007 0921 -0924 1
10/31/2007 0213-0217 4
10/31/2007 1738 -1741 7
Total Flare •= 1 Hour 20
Total Flare> 1 Hour 0
Volume Flared 20
Measured Safety Pilot 99
Continuous Assist 1,567
TOTAL FLARED 1,686
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct -07
1801 SNAP Compressor start-up purge
1801 STVIIP Compressor shutdown for unknown reason
1808 reinjection compressor start-up purge
P02003SV HP relief valve on 24• common line laded
P02003SV HP releif valve an 24' common line failed
1807 T/C shutdown due to maint. causing flaring thru HP valves
1808 T/C shutdown due to maint. causing flaring thru HP valves
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Flare valves closed after purge sequence
Restarted 1801 compressor
Flare valves closed after purge sequence
P02003SV was blocked in
P2003SV repaired and returned to service
Compressor completed depressurizing
Compressor completed depressurizing
•
VOLUME
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE
10/1/2007 0157 -0221 1
10/1/2007 0606 -0659 2
10/1/2007 2138 -2140 0
10/6/2007 0007 -0041 4
10/6/2007 0921-0924 0
10/31/2007 0213 -0217 7
10/31 /2007 1736 -1741 7
Total Flare c= 1 Hour 21
Total Flare> 1 Hour 0
Volume Flared 21
Measured Safety Pilot 139
Continuous Assist 2,153
TOTAL FLARED 2,343
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIOENTS
Oct -07
1801 STVFP Compressor start-up purge
1801 SNAP Compressor shutdown for unknown reason
1808 reinjection compressor start-up purge
P02003SV HP relief valve on 2e common line tailed
P02003SV HP releif valve on 24' common line failed
1807 T/C shutdown due to maint. causing flaring thru HP valves
1808 T/C shutdown due to maint. causing flaring thru HP valves
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Flare valves closed atter purge sequence
Restarted 1801 compressor
Flare valves closed after purge sequence
PO2003SV was blocked in
P2003SV repaired and returned to service
Compressor completed depressurizing
Compressor completed depressurizing
DATE TIME
10/1/2007 0157 -0221
10/1 /2007 0606 -0659
10/1/2007 2138 -2140
10/6/2007 0007 -0041
10/6/2007 0921 -0924
10(31/2007 0213 - 0217
10/31/2007 1736 -1741
Total Flare a= 1 Hour 12
Total Flare > 1 Hour 0
Volume Flared 12
Measured Safety Pilot 25
Continuous Assist 405
TOTAL FLARED 442
BP EXPLORATION ALASKA. INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY. RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-07
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
2 1801 STV/IP Compressor start-up purge
6 1801 STV/IP Compressor shutdown for unknown reason
2 1808 reinjection compressor start-up purge
1 P02003SV HP relief valve on 24" common line failed
0 P02003SV HP releif valve on 24' common line failed
0 1807 T/C shutdown due to main. causing flaring thru HP valves
1 1808 T/C shutdown due to main. causing haring thru HP valves
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
UnplanmM
Unplanned
Unplarned
Unp4.nned
Unp armed
Unplanned
Flare valves closed after purge sequence
Restarted 1801 compressor
Flare valves closed after purge sequence
P02003SV was blocked in
P2003SV repaired and returned to service
Compressor completed depressurizing
Compressor completed depressurizing
McMains, Stephen E (DOA)
From: GPB, Prod Opt TL (GPBProdOptTLQBP.com]
Sent: Saturday, October 06, 2007 2:38 PM
To: McMains, Stephen E (DOA)
Cc: GPB, Environ TL; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Environ
Advisor West; GPB, Area Mgr West (GC2/W RD); GPB, GC2 011.; GPB, Environ Advisor
East; GPB, Area Mgr North (Gas Plants/GPMA); GPB, GPMA OTL; GPB, Area Mgr East
(FS1 /2/COTU /Seawater); GPB, FS2/COTU OTL; GPB, Area Mgr Central (GC1 /3 /FS3); GPB,
GC1 OTL; GPB, FS1 OIL
Subject: GPB Gas Flaring Events
To: Steve McMains, AOGCC
stave mcmains(a1aamir ?r
907-793-1241, fax 907- 276 -7542
From: Hal Tucker, GPB Production Optimization Team Leader
Multiple extended flaring events occurred at GPB during the last week.
Two extended flaring events occurred at FS1 on 10/1 and 10/2 for planned maintenance on their LPS
machines. On 10/1 LPS machine 1803 was shut down for water washing. Total duration was 20 hours
and Total durationw s 14 hours and 28 minutes, total volume occurred s 1 93 MSCF�r the same activity
FS2 water washed their LPS machine (1803) on 10/4. Total flare duration was 4 hours and 26 minutes,
total volume was 924 MSCF.
On 10/5, GC1 had two extended flaring events. The first event took place to de- pressure a flowline to
make PSV repairs. Total duration was 10 hours and 27 minutes of intermittent flaring which resulted in a
total flared volume of 871 MSCF. A second event occurred when ambient temperatures increased. 100
MMSCF /d of production was cut to stop fla ing. Total duration of this event was 84 minutes, total volume
was 875 MSCF.
The LPG tacility flared for 97 minutes during the restart process following planned ESD safety system
testing on 9/30. Total volume for this event was 97 MSCF.
Extended flaring events occurred at GC2 on October 3, 4 and 5 during restart activities following a
lengthy, planned, full plant tum- around. Flaring occurred off the LP compressor until sufficient rate was
brought on to enable the LP machine to Toad up and remain loaded (common to all three events).
Following the tum- around restart, GC2 was shut down for planned ESD testing, creating an additional
extended flaring event. A summary of the flaring events follows:
10/3 Initial restart 21 hrs, 49 min 12,726 MSCF
10/3-4 Intermittent 22 hrs, 30 min 16,014 MSCF
10/5 Following ESD 8 hrs, 0 min 7,778 MSCF
If you require additional information, please don't hesitate to call me.
Hal Tucker
GPB Production Optimization TL
(907) 659-4472
1
1. Facility Number
0290000009
12. Facilely Name
IPBU LISBURNE PROD (GPMA)
3. Field
PBU - GPMA
4. Operator
BP
5. MonthVYear of Diapoei an
November -2007
Disposition
Volume MCF
20. For production from multiple pools. list contnbution of each pool as • percent of
Total Volume
B. Sold
110,332
Pool Name
Pod Code
Percent
7. Reinjected
10,690,792
Lisburne
640144
58.0°f°
Niakuk
640148
1.8%
• Fareeavanted 1 ftovaless
1046
North Prudhoe Bay State
640152
0.0%
Sadlerochit
640150
0.0%
9 Fares a vented more than 1 hour (see inso)
2,343
Point McIntyre
640180
39.5%
Ivishak -Saq River test in
640147
2.7%
10 Plot r d Purge
11,817
West Beach
640186
0.0%
11. used far lease operatiotn (specay in Remarks)
1,050,725
` _... -
-
e
12. Other (see Instigations)
1,554,073
Authorization >1 hc.
Safely
7 34 3
MCF
13. TOTAL VOLUME (ITEMS 6-12)
13.421,128
Lease Use
MCF
14 NGL Gas Equivalent
110,332
Conservation
MCF
15. Purchased gas
0
Waste
MCF
18 Transferred from:
2,261,739
/ '� te
C i r Dale
17. Transferred a: (Egress as a negative e) CGF
0
18. Remarks. Block t 1: Fuel Gas = 860,456 and and Assist Gas =190,269 nsef; Block 12: Lif Gas Oft Field; Block 16: MI from Prudhoe = 2,046,922 and Fuel Gas from
Prudhoe = 210.817
i hereby certify that the foregoing i5 and c ect to the best of my krgwledge
Manager, State Production Taxes
Signature Tee and Royalty
Note: All volumes must be
corrected to pressure of 14.65 psis
and to a temperature of 60o F-
Authority 20 AAG25.235,
Printed wine Bernard W. Hajny Pnone 0071564-5026 Date / el /t' d 1
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
DATE
11/8/2007 1709 -1743
VOLUME
TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
11/10/2007 0458-0538 500 P-02003 SV started leaking
Total Flare c= 1 Hour 572
11/5/2007
11/6/2007
11/7/2007
11/9/2007
1455 -1818
0739 -1209
1437 -1736
0740-0940
Total flare > 1 Hour 1,200
Volume Flared 1,772
Measured Safety Pilot 6,663
Continuous Assist 106,795
TOTAL FLARED 115,230
72 EOR compressor 1030 startup
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov -07
821 1830 MI compressor startup attempt
27 1830 MI compressor startup attempt
270 EOR compressor 1830 startup
82 EOR compressor 1830 startup
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Planned EOR startup procedures, startup failed
Unplanned Blocked in PSV to flare
Planned
Planned
Planned
Planned
1830 compr startup & depressurization complete
1830 compr startup & depressurization complete
EOR startup procedures, startup failed
FOR startup completed and machine online
DATE
11/8/2007 1709 -1743 57 FOR compressor 1830 startup
11/10/2007 0458-0538 394 P42003 SV started leaking
Total Flare ea 1 Hour 451
11/05/07 1455 -1818 765
11/06/07 0739 -1209 25
11/07/07 1437 -1736 232
11/09107 0746-0940 65
Total Flare > 1 Hour 1,087
Volume Flared 1.538
Measured Safety Pilot 4,627
Continuous Assist 75,086
TOTAL FLARED 81,251
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
USBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov -07
VOLUME
TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
1830 MI compressor startup attempt
1830 MI Compressor startup attempt
EOR compressor 1830 Startup
EOR compressor 1830 startup
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Planned
EOR startup procedures, startup failed
Unplanned Blocked in PSV to flare
Planned
Planned
Planned
Planned
1830 comer startup & depressurization complete
1830 comer startup & depressurization complete
EOR startup procedures, startup failed
EOR startup completed and machine online
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS 8 CAUSE
11/8/2007 1709 - 1743 0 EOR compressor 1830 startup
11/10/2007 0458-0538 0 P -02003 SV started leaking
Total Flare c= 1 Hour 0
11105/07
11/06/07
11/07/07
11(09/07
1455 -1818
0739 -1209
1437 -1738
0746 -0940
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
O 1830 MI compressor startup attempt
O 1830 MI compressor startup attempt
O FOR compressor 1830 startup
O EOR compressor 1830 startup
0
0
0
0
0
BP EXPLORATION ALASKA, INC.
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov -07
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Planned EOR startup procedures, startup tailed
Unplanned Blocked in PSV to flare
Planned
Planned
Planned
Planned
1830 compr startup 8 depressurization complete
1830 compr startup 8 depressurization complete
EOR startup procedures, startup failed
EOR startup completed and machine online
DATE
11/812007 1709 -1743
11/10/2007 0458-0538
Total Flare r_ 1 Hour 0
11/05/07 1455 -1818
11/06/07 0739 -1209
11/07/07 1437 -1736
11/09/07 0748-0940
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
O EOR compressor 1830 startup
0 P-02003 SV started leaking
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov - 07
VOLUME
TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
O 1830 MI compressor startup attempt
O 1830 MI compressor startup attempt
O EOR Compressor 1830 startup
O FOR compressor 1830 startup
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Planned EOR startup procedures, startup failed
Unplanned Blocked in PSV to flare
Planned
Planned
Planned
Planned
1830 compr startup & depressurization complete
1830 compr startup & depressurization complete
EOR startup procedures, startup failed
EOR startup completed and machine online
DATE TIME
11/8/2007 1709-1743 1 FOR compressor 1830 startup
11/10/2007 0458-0538 7 P-02003 SV started Pealing
Total Flare c= 1 Hour 8
11/05/07 1455 -1818
11/08/07 0739 -1209
11/07/07 1437-1736
11/09/07 0748-0940
Total Flare 1 Hour 21
Volume Flared 29
Measured Safety Pilot 89
Continuous Assist 1,439
TOTAL FLARED 1,557
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY. NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov -07
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS 8 CAUSE
15 1830 MI compressor startup attempt
1 1830 MI compressor startup attempt
4 FOR compressor 1830 startup
1 EOR compresses 1830 startup
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Planned EOR startup procedures, startup failed
Unplanned Blocked in PSV to flare
Planned
Planned
Planned
Planned
1830 compr startup 8 depressurization complete
1830 compr startup 8 depressurization complete
EOR startup procedures, startup tailed
EOR startup completed and machine online
DATE TIME
Total Flare <c 1 Hour 14
11/8/2007 1709 -1743 2 FOR compressor 1830 startup
11/10/2007 0458 -0538 12 P -02003 SV started leaking
11/05/07 1455 -1818
11/06/07 0739 -1209
11/07107 1437 -1736
11/09/07 0746-0940
Total Flare, 1 Hour 32
Volume Flared 46
Measured Safety Pilot 141
Continuous Assist
TOTAL FLARED
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS 8 CAUSE
22 1830 MI compressor startup attempt
1 1830 MI rprrlpressor startup attempt
T £OR compressor 1830 startup
2 FOR compressor 1830 startup
2,308
2,495
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY. WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov -07
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Planned EOR startup procedures, startup failed
Unplanned Blocked in PSV to flare
Planned
Planned
Planned
Planned
1830 compr startup 8 depressurization complete
1830 compr startup & depressurization complete
EOR startup procedures, startup failed
EOR startup completed and machine online
DATE TIME
Total Flare c= 1 Hour 1
11/05/07
11/06/07
11/07/07
11/09/07
1455 -1818
0739 -1209
1437 -1736
0746-0940
Total Flare 1 Hour 3
Volume Flared 4
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
VOLUME
(Mset) DESCRIPTION OF INCIDENTS & CAUSE
11/8/2007 1709 -1743 0 FOR compressor 1830 startup
11/10/2007 0458-0538 1 P -02003 SV started leaking
2 1830 MI compressor startup attempt
0 1830 MI compressor startup attempt
1
EOR compressor 1830 startup
0 EOR compressor 1830 startup
297
4,641
4,942
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov -07
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Planned EOR startup procedures, startup failed
Unplanned Blocked in PSV to flare
Planned
Planned
Planned
Planned
1830 compr startup & depressurization complete
1830 compr startup & depressurization complete
EOR startup procedures, startup tailed
EOR startup completed and machine online
Flare Start Date 11/1/2007
Flare End Date It/30/2007
LPC Flare Report
Time Of Flaring
Report System Date Start Time Stop Time Duration Intermit'nt BIk Smoke Planned Reported By Volume (MSCF)
07 -535 Flare Relief 11/5/2007 2:55:00 PM 6:18:00 PM 203 minutes Yes
Determination Cause 1830 MI Compressor startup attempt. A total of 74 minutes flared
intermittently.
Action Taken
1830 MI Compressor startup attempt complete and compressor
depressurization competed.
07-536 Flare Relief 11/6/2007 7:39:00 AM 12:09:00 PM 270 minutes Ves No Ves BPI \CATESDR 54
Determination Cause 1830 MI Compressor Startup Anempt. A total of 6 minutes of flaring.
Action Taken 1830 MI Compressor Startup Attempts complete and compressor
depressurization competed
07 -488 Flare Relief 11/7/2007 2:37:00 PM 5:38:00 PM 179 minutes No No Yes BP1\SCHRADOG 514
Determination Cause 1830 nomnal start up.
Action Taken
EOR startup pmcedures,start up faded
No Yea BPI \CATESDR
1825
07 -485 Flare Relief 11/8/2007 5:09:00 PM 5:43:00 PM 34 minutes No No Yes 13P1\SCHRADDG 132
Determination Cause 1830 normal start up.
Action Taken EOR startup pmcedures.start up tailed.
Flare Start Date 11/112007
Flare End Date 11/30/2007
LPC Flare Report
Time Of Flaring
Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF)
07 -487 Flare Relief 11/9/2007 7:48:00 AM 9:40'00 AM 114 minutes No NO Yes BP1\STROUDJD 150
Determination Cause FOR compressor (1830) startup.
Action Taken FOR compressor (1830) startup completed and machine online.
McMains, Stephen E (DOA)
From:
Sent:
To:
Cc:
Subject:
To: Steve McMains, AOGCC
steve_mcmains@admin.state.ak.us
907 -793 -1241, fax 907- 276 -7542
From: Hal Tucker, GPB Production Optimization Team Leader
An extended flaring event occurred at LPC on November 9th while making another start up attempt on the 1830 MI
compressor. LPC operations successfully restarted the machine on this attempt. Flare duration was 114 minutes.
Total volume flared was 150 MSCF.
If you require additional information, please don't hesitate to call me.
Hal Tucker
GPB Production Optimization TL
(907) 659 -4472
Hal Tucker
GPB Production Optimization TL
(907) 659 -4472
GPB, Prod Opt TL [GPBPradOptTL @BP.com]
Friday, November 09, 2007 1:40 PM
McMains, Stephen E (DOA)
GPB, Environ TL; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Environ
Advisor East; GPB, Area Mgr North (Gas Plants/GPMA); GPB, GPMA OTL
FW: GPB Gas Flaring Event
From: GPB, Prod Opt 11
Sent: Friday, November 09, 2007 11:04 AM
To: 'sieve _mcmains @admin.state.ak.us'
Cc: GPB, Environ TL; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Environ Advisor East; GPB, Area Mgr North
(Gas Plants /GPMA); GPB, GPMA OTL
Subject: GPB Gas Flaring Event
To: Steve McMains, AOGCC
steve_mcmains@admin.state.ak.us
907 -793 -1241, fax 907 -276 -7542
From: Hal Tucker, GPB Production Optimization Team Leader
An extended flaring event occurred at LPC on November 7th. Flaring is part of the normal 1830 (MI compressor) start
up procedure. LPC operations was unable to complete a successful restart of the machine. Flare duration was 179
minutes. Total volume flared was 514 MSCF.
If you require additional information, please don't hesitate to call me.
1
Facility Number
0290000009
I1. 2. FaoiliFacility Name
PBU LISBURNE PROD (GPMA)
3 Field
PBU - GPMA
4 Operator
BP
5. MoneWear of Disposition
December - 2007
Disposition
Volume MCF
20. For production from multiple pools, list conmbution of each pool as a percent of
Total Volume
6. gold
112,990
Pool Name
Pod Code
Percent
7. Refriined
11.350.374
Lisburne
640144
56.8%
Niakuk
640148
1.3%
8. Flared or vented 1 hour or less
426
North Prudhoe Bay State
640152
0.0°0
Sadlerochit
640150
0.0%
1 lour (see intr.)
0
Pant McIntyre
640180
38.1%
m
9 Flared or vented more than
Ivishak - Saq River test in
640147
3.8%
10 Pool and lava
12.251
West Beach
640186
0.0%
11. Used for lease opera60ne (specify in Remarks)
1 111 ,493
12. Omer (see instructions)
1,539,795
Usti Only
Aumorization >1 hr.
Safety
Ma
13. TOTAL VOLUME (ITEMS 6-12)
14,127,329
Lease Use
MCF
14. NGL Gas Equivalent
112.990
Conservation
MCF
15 Purchased gas
0
Waste
MCF
16. Transferred van:
1,748.815
Commissioner Date
17. Transferred to (Express as a negative 9) CGF
0
18. Remarks. Black I II Fuel Gas = 944130 md1 and Assist Gas = 1) 1,363 nisei: Block 12: Lit Gas Oft Field; Block I6- MI from Prudhoe = 1,478,724 and Fuel Gas from
Prudhoe = 270,091
I hereby certify mat the foregoing is true and Correct to the best of my knowledge.
Manager, State Production Taxes
signature t.....„. 1 - L +Er Tide and Royalty
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 60o F.
Authority 20 AAC25.235.
Printed Name Bernard W. Hajny Phone (9071564 - sole Date ( f 1 S/0 S
Form 10 -422 Rev. 1 /2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
12/13/2007 0012-0017
12/13/2007 0242 - 0244
12/17/2007 1322 -1328
12/17/2007 1335 -1336
12/17/2007 1358 -1411
12/17/2007 1415-1424
Total Flare <= 1 Hour 258
Total Flare a 1 Hour 0
Volume Flared 256
Measured Safety Pilot 6,955
Continuous Assist 97,523
TOTAL FLARED 104,736
BP EXPLORATION ALASKA. INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-08
10 1830 MI compressor shutdown due to CPS power glitch
9 1830 MI depressure sequencing
68 Startup of 1830 MI compressor
2 Startup of 1830 Mt compressor
37 Startup of 1830 MI compressor
132 Startup of 1830 MI compressor
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Planned
Planned
Planned
Planned
Flare valve closed
Flare valve closed
1830 MI startup purge and wannup steps
1830 MI startup purge and warmup steps
1830 MI startup purge and wannup steps
1830 MI compressor startup completed
DATE TIME
12/13/2007 0012-0017
12/13/2007 0242 -0244
12/17/2007 1322 -1328
12/17/2007 1335 -1336
12/17/2007 1358 -1411
12/17/2007 1415 -1424
Total Flare « 1 Hour 145
Total Flare > 1 Hour 0
Volume Flared
145
Measured Safety Pilot 4,678
Continuous Assist 65,175
TOTAL FLARED 69,998
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec -08
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
8 1830 MI compressor shutdown due to CPS power glitch
3 1830 MI depressure sequencing
38 Startup of 1830 MI Compressor
0 Startup of 1830 MI compressor
21 Startup of 1830 MI compressor
75 Startup of 1830 MI compressor
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Planned
Planned
Planned
Planned
Flare valve dosed
Flare valve dosed
1830 MI startup purge and wannup steps
1830 MI startup purge and wannup steps
1830 MI startup purge and warmup steps
1830 MI compressor startup completed
12/13/2007 0012-0017 0
12/13/2007 0242 -0244 0
12/17/2007 1322 -1328 0
12/1712007 1335 - 1338 0
12/17/2007 1358 - 1411 0
12/17/2007 1415 -1424 0
Total Flare a 1 Hour 0
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
0
0
0
0
0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-08
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
1830 MI compressor shutdown due to CPS power glitch
1830 MI depressure sequencing
Startup of 1830 MI compressor
Startup of 1830 MI compressor
Startup of 1830 MI compressor
Startup of 1830 MI compressor
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Planned
Planned
Planned
Planned
Flare valve closed
Flare valve dosed
1830 MI startup purge and warmup steps
1830 MI startup purge and warmup steps
1830 MI startup purge and warmup steps
1830 MI compressor startup completed
DATE TIME
12/13/2007 0012-0017
12/13/2007 0242 -0244
12/17/2007 1322 -1328
12/1712007 1335.1338
12/17/2007 1358 -1411
12/17/2007 1415 -1424
Total Flare <= 1 Hour 0
Total Fiore > 1 Hour
Volume Flared
Measured Safety Not
Continuous Assist
TOTAL FLARED
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
0 1830 MI compressor shutdown due to CPS power glitch
0 1830 MI depressure sequencing
O Startup of 1830 MI Compressor
0 Startup of 1830 MI compressor
0 Startup of 1830 MI Compressor
O Startup of 1830 MI compressor
0
0
0
0
0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-08
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Planned
Planned
Planned
Planned
Flare valve closed
Flare valve dosed
1830 MI startup purge and warmup steps
1830 MI startup purge and warmup steps
1830 MI startup purge and warmup steps
1830 MI compressor startup Completed
I
DATE TIME
12/13/2007 0012-0017
12/13/2007 0242 -0244
12/17/2007 1322 -1328
12/17/2007 1335 -1336
12/17/2007 1358 -1411
12/17 /2007 1415 -1424
Total Flare <= 1 Hour 2
Total Flare > 1 Hour 0
Volume Flared 2
Measured Safety Pilot 51
Continuous Assist 722
TOTAL FLARED 775
BP EXPLORATION ALASKA, INC.
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-08
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
O 1830 MI compressor shutdown due to CPS power glitch
O 1830 MI depressure sequencing
1 Startup of 1830 MI Compressor
O Startup of 1830 MI compressor
0 Startup of 1830 MI compressor
1 Startup of 1830 MI Compressor
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Planned
Planned
Planned
Planned
Flare valve closed
Flare valve closed
1830 MI startup purge and warmup steps
1830 MI startup purge and warmup steps
1830 MI startup purge and warmup steps
1830 MI compressor startup completed
12/13/2007 0012-0017
12/13/2007 0242 -0244
12/17/2007 1322 -1328
12117/2007 1335 -1336
12/17/2007 1358 -1411
12/17/2007 1415 -1424
Total Flare a 1 Hour 5
Total Flare > 1 Hour 0
Volume Flared 5
Measured Safety Pilot 106
Continuous Assist 1,494
TOTAL FLARED 1 ,605
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec -08
VOLUME
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE
0 1830 MI compressor shutdown due to CPS power glitch
0 1830 MI depressors sequencing
2 Startup of 1830 MI compressor
0 Startup of 1830 MI compressor
1 Startup of 1830 MI compressor
2 Startup of 1830 MI compressor
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Planned
Planned
Planned
Planned
Flare valve closed
Flare valve closed
1830 MI startup purge and warmup steps
1830 MI startup purge and warmup steps
1830 MI startup purge and warmup steps
1830 MI compressor startup completed
DATE TIME
12/13/2007 0012-0017
12/13/2007 0242 -0244
12/17/2007 1322 -1328
12/17/2007 133
12/17/2007 1358 -1411
12/17/2007 1415-1424
Total Flare at 1 Hour 16
Total Flare > 1 Hour 0
Volume Flared 16
Measured Safety Pilot 461
Continuous Assist 6,449
TOTAL FLARED 6,926
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec -08
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
1 1830 MI compressor shutdown due to CPS power glitch
0 1830 MI depressure sequencing
4 Startup of 1830 MI compressor
0 Startup o(1830 M1 compressor
3 Startup of 1830 MI Compressor
8 Startup of 1830 MI compressor
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Planned
Planned
Planned
Planned
Flare valve dosed
Flare valve closed
1830 MI startup purge and wannup steps
1830 MI startup purge and wannup steps
1830 MI startup purge and warmup steps
1830 MI compressor startup completed
Flare Start Date 12/1/2007
Flare End Date 12/31/2007
LPC Flare Report
Time 01 Flaring
Report System Date Start Time Stop Time Duration Intermifnt Bik Smoke Planned Reported By Volume (MSCF)
07 -580 Flare Relief 12/17/2007 1:22:00 PM 1:28:00 PM 6 minutes Ves No Yes BP1 \CATESDR 113
Determination Cause Flaring due to Startup o1 1830 MI Compressor.
Action Taken Startup of 1830 MI Compressor and going thru Purge and Warmup
Steps for Startup.
07 -580 Flare Relief 12/17/2007 1:35:00 PM 1:36:00 PM 1 minute Yes No Yes BPI \CATESDR 2
Determination Cause Flaring due to Startup of 1830 MI Compressor.
Action Taken Startup of 1830 MI Compressor and going thru Purge and Warmup
Steps for Startup.
07 -580 Flare Relief 12/17/2007 1:58:00 PM 2:11:00 PM 13 minutes Ves No Ves BP1 \CATESDR 62
Determination Cause Flaring due to Startup of 1830 MI Compressor.
Action Taken Startup of 1830 MI Compressor and going thru Purge and Warmup
Steps for Startup.
07 -580 Flare Relief 12/17/2007 2:15:00 PM 2:24:00 PM 9 minutes Yes No Yes BPI \CATESDR 218
Determination Cause Flaring due to Startup of 1830 MI Compressor.
Action Taken Startup of 1830 MI compressor completed.
Flaring Event at Milne Point December 20, 2007 Page 1 of 1
McMains, Stephen E (DOA)
From: MPU, Enviro Advisor (MPUEnviroAdvisor a@BP.com]
Sent: Wednesday, December 19, 2007 5:58 PM
To: McMains, Stephen E (DOA)
Cc: MPU, Facility Lead Tech; MPU, Facilities Supervisor; MPU, Facilities Supervisor; MPU, Area
Manager; Pfeiffer, Jim A; ANC, Env Data Coord; Fiedler, Anne M; MPU, Enviro Advisor; Chris
Lindsey
Subject: Flaring Event at Milne Point December 20, 2007
Mr. McMains,
This is a courtesy notification. A flaring event is planned to occur at Milne Point on December 20 at 0700 hrs.
Operations necessitates that we shut in one of our large compressors to repair a bearing which is anticipated to
take 36 -48 hours to complete. Due to the severe temperatures right now, we believe there may be safety issues
involved with shutting in wells to accommodate this repair, therefore we plan to utilize the flare during the
compressor shutdown. We estimate that approx 12,000MCF of gas will be released during this time period. In
consideration of all the required work, believe this flaring event is consistent with "good oil field engineering
practices and conservation purposes ". The actual volume of this flared event will be reported in AOGCC's Facility
Report of Produced Gas Disposition (Form 10 -422) at the end of December.
Please let me know if you have any questions.
Best Regards,
Karen' homers -Ton
Environmental Advisor
Milne Point. Alaska
ph: 907.670.3382 fax: 907- 670 -3175
Alternate: Deb Heebner
12/20/2007
Flaring event at Milne Point December 23, 2007 Page 1 of 1
McMains, Stephen E (DOA)
From: MPU, Enviro Advisor [MPUEnviroAdvisor@BP.com]
Sent: Sunday. December 23, 2007 3:04 PM
To: McMains, Stephen E (DOA)
Cc: MPU, Facilities Supervisor; MPU, Facility Lead Tech; MPU, Area Manager; Pfeiffer, Jim A; Fiedler,
Anne M; MPU, Enviro Advisor; Al Trbovich; Chris Lindsey; MPU, Well Operations Supervisor
Subject: Flaring event at Milne Point December 23, 2007
Mr. McMains,
This is a courtesy notification. Intermittent flaring is on -going at Milne Point due to operational malfunctions
involving the small compressor. The equipment is currently undergoing evaluation to determine the extent of the
repairs. We plan to give you an update in the morning regarding the type of repairs and the expected duration of
the flare. In consideration of all the required work, we believe this flaring event is consistent with "good oil field
engineering practices and conservation purposes ". The actual volume of this flared event will be reported in
AOGCC's Facility Report of Produced Gas Disposition (Form 10 -422) at the end of December.
Please let me know if you have any questions.
Best Regards,
7(prm 4Tromas -9'ord
Environmental Advisor
Milne Point. Alaska
ph: 907.670.3382 fax: 907- 670 -3175
Alternate: Deb Heebner
12/24/2007
McMains, Stephen E (DOA)
From: GPB, Prod Opt TL [GPBProdOptTL @BP.comi
Sent: Monday, December 24, 2007 3:53 PM
To: McMains, Stephen E (DOA)
Cc: GPB. Environ TL; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Environ
Advisor West; GPB, GC2 OTL; GPB, Area Mgr West (GC2/WRD)
Subject: GPB Gas Flaring Event
To: Steve McMains, AOGCC
steve_mcmains @admin.state.ak. us
907-793-1241, fax 907- 276 -7542
From: Hal Tucker, GPB Production Optimization Team Leader
On 12/22/07 an extended flaring event occurred at GC2 when LP compressor, K205, lost forward flow.
Troubleshooting efforts identified high back pressure from inlet knockout to IP compressor K207 as the cause. Output
from K205 was increased allowing K207 to load back up. Flaring lasted for 111 minutes. Total volume flared was
1002 MSCF.
if you require additional information, please don't hesitate to call me.
Hal Tucker
GPB Production Optimization TL
(907) 659-5566/4472
1
Flaring at Milne Point December 21 through December 25, 2007 Page 1 of 2
McMains, Stephen E (DOA)
From: MPU, Enviro Advisor (MPUEnviroAdvisor @ BP.com]
Sent: Monday, December 31, 2007 3:24 PM
To: McMains, Stephen E (DOA)
Subject: RE: Flaring at Milne Point December 21 through December 25, 2007
Steve,
The 5531 B Injection Compressor is in the third stage of the oil separation process at the Central Facilities Pad
(CFP). There are two injection compressors (5531 A and 5531 B) in this stage, that are two stage
reciprocating type, installed with suction and a discharge pulsation dampener on each separate stage.
The discharge from these compressors is routed to the gas compressor aftercoolers (X-5531 NB). These
aftercoolers are shell & tube type heat exchangers (cooling medium on the shell side). From the aftercoolers, the
gas is routed from CFP to various wellpads for injection into the formation. The injection compressors are
operating in a very sensitive final process where it is most difficult to separate out any remaining gas.
The injection compressors use assist gas as make -up gas for operation. Milne uses blanket gas from Vessel
5411 for the make -up gas for the 5531A and 55318 Injection Compressors. When the on injection compressor
went down there was excess gas from the process that was relieved to the flare. Milne Operators had to
manually figure out where the excess gas was relieving from with the compressor down and then worked at
eliminating the excess gas.
The Operators manually recalibrated the blanket gas Regulator for Vessel 5411, so it didn't need to relieve to the
flare.
Let me know if you have any questions.
Happy New Year.
Thanks,.
Deb
From: McMains, Stephen E (DOA) [ mailto :steve.mcmains @alaska.gov]
Sent: Monday, December 31, 2007 7:46 AM
To: MPU, Enviro Advisor
Subject: RE: Flaring at Milne Point December 21 through December 25, 2007
What did you discovered to eliminate the flaring while the compressor was undergoing repair?
Steve
From: MPU, Enviro Advisor [mailto:MPUEnviroAdvisor @BP.com]
Sent: Sunday, December 30, 2007 7:58 PM
To: McMains, Stephen E (DOA)
Cc: MPU, Facilities Supervisor; MPU, Facility Lead Tech; MPU, Area Manager; Pfeiffer, Jim A; Fiedler, Anne M;
Trbovich, AL (Hoefler); Chris Lindsey; MPU, Well Operations Supervisor
Subject: Flaring at Milne Point December 21 through December 25, 2007
Mr. McMains,
You requested a follow -up notification of the total volume flared during the 5531 B Injection Compressor Repair at
Milne Point, We are still in the process of repairing the compressor, but discovered a way to eliminate the flaring
while the compressor was undergoing repair. There will be no additional flaring required due to the 5531 B
1/2/2008
Flaring at Milne Point December 21 through December 25, 2007
Injection Compressor Repair. The total volume flared due to the 55318 Injection Compressor Repair was
2,645.78 MCF.
Page 2 of 2
We believe this flaring was consistent with "good oil field engineering practices and conservation purposes ". The
actual volume of this flared event will also be reported in AOGCC's Facility Report of Produced Gas Disposition
(Form 10 -422) at the end of December.
Please let me know if you have any questions.
Thanks,
(De69fee6ner
Environmental Advisor
Milne Point, Alaska
ph: 907.670.3382 lax: 907-670-3175
Alternate: Karen Thomas -Ford
From: MPU, Enviro Advisor
Sent: Sunday, December 23, 2007 3:04 PM
To: ' ste ve_mcmains @admin.state.ak.us'
Cc: MPU, Facilities Supervisor; MW, Facility Lead Tech; MPU, Area Manager; Pfeiffer, Jim A; Fiedler, Anne M; MPU, Enviro Advisor; Al Trbovich;
Ards Lindsey; MPU, Well Operations Supervisor
Subject: Flaring event at Milne Point December 23, 2007
Mr. McMains,
This is a courtesy notification. Intermittent flaring is on -going at Milne Point due to operational malfunctions
involving the small compressor. The equipment is currently undergoing evaluation to determine the extent of the
repairs. We plan to give you an update in the morning regarding the type of repairs and the expected duration of
the flare. In consideration of all the required work, we believe this flaring event is consistent with "good oil field
engineering practices and conservation purposes ". The actual volume of this flared event will be reported in
AOGCC's Facility Report of Produced Gas Disposition (Form 10 -422) at the end of December.
Please let me know if you have any questions.
Best Regards,
Nrrren'Thomas -ford
Environmental Advisor
Milne Point, Alaska
ph: 907.670.3382 lax: 907 -670 -3175
Alternate: Deb Heebner
1/2/2008