YEAR: 2008
FACILITY: Northstar
OPERATOR: BP EXPLORATION
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
0290000025 N1 Northstar BP Jan - 2008
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total
Volume.
6. Sold 0 Pool Name Pool Code Percent
7. Reinjected 13,702,837 Northstar 590100 100.0%
Northstar 590500 0.0%
8. Flared or vented 1 hour or less 4,005
9. Flared or vented more than 1 hour (see instr.) 6,200
10. Pilot and Purge 0
11. Used for lease operations (specify in Remarks) 0
Official Use Only
12. Other (see instructions) 0 Authorization >1 hr: �yi y r }a✓ MCF
1. (�'�
13. TOTAL VOLUME (ITEM 13,713,042 MCF
Lease Use
14. NGL Gas Equivalent
FEB 2 0 2nf Conservation MCF
15. Purchased gas 1,863,601
Waste: MCF
Alma ON & Cklb Conn. Commission
16. Transferred from: AnChOrage , >1°- el -7-0 g
Commissioner Date
17. Transferred to: (Express as a negative #)
18. Remarks: Blocks 6 - 13 include only produced gas from Northstar (i.e. no purchased gas). Gas purchased from PBU was used as follows (all in mscf): fuel gas
699,898, pilot purge 2759, injection 1,160,944.
I hereby certify that the foregoing i true an correct to the best of my knowledge.
Note: All volumes must be corrected
Signature 7 i Title Manager, Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Bernard W. Hajny Phone (907)564 - 5028 Date // Ci 9 AAC25.235.
Form 10 -422 Rev. 1/2004 Submit in Duplicate
Northstar Gas Flaring Incident Report
1/1/2008 - 1/31/2008
Start Date / Time End Date / Time Minutes MCF Incident Cause / Description Remediation Taken Event Type Flare
Planned Less Than 1 Hour
Group Total 71
Planned Greater Than 1 Hour
Group Total 0
Unplanned Less Than 1 Hour
Group Total 3,934
Unplanned Greater Than 1 Hour
01/06/2008 11:58 01/06/2008 15:33 215.00 919 The LP compressor S/D due to the HPB S/D and S/I NS -6, 13, 14, 15, 18 & 22 initially to mitigate Equipment Outage LP
the resulting increase in LP discharge pressure flaring.
( causing the compressor to surge and S/D on hi hi
1st stage suction pressure.
01/06/2008 12:05 01/06/2008 15:47 222.00 2,331 HPB compressor S/D due to a problem with the S/I NS -6, 13, 14, 15, 18 & 22 initially to mitigate Equipment Outage HP1
fuel control governor. Flaring was from the flaring.
contactor.
01/07/2008 03:50 01/07/2008 08:41 291.00 1,225 PC -1030 on IP Sep. malfunctioned. Tech's remediated problem with Controller. Plant Startup HP1
` 01/07/2008 05:19 01/07/2008 07:46 147.00 511 PC -1030 on IP Sep. malfunctioned. Unable to Tech's remediated problem with Controller. Cut Plant Startup LP
start LP back wells to mitigate flaring
01/16/2008 21:08 01/16/2008 22:19 71.00 84 FI2360 for HPA had a ice plug giving incorrect Blew out tap to FI2360 xmtr Equipment Outage HP1
indication to HPA
. 01/19/2008 10:51 01/19/2008 12:10 79.00 912 While performing maintenance on the shore Started generator, charged batteries and opened Upset HP1
K crossing generator the shore crossing valves up shore crossing valves
went closed causing plant shutdown
01/19/2008 12:14 01/19/2008 13:40 86.00 218 While performing maintenance on the shore Started generator, charged batteries and opened Upset LP
crossing generator the shore crossing valves up shore crossing valves
went closed causing plant shutdown I
Group Total 6,200
Report Total 10,205
FlarelncidentDetails 01- 2008.xls 2/8/2008 10:19 AM
w
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
0290000025 N1 Northstar BP Feb - 2008
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total
Volume.
6. Sold 0 Pool Name Pool Code Percent
7. Reinjected 13,434,941 Northstar 590100 100.0%
Northstar 590500 0.0%
8. Flared or vented 1 hour or less 1,544
9. Flared or vented more than 1 hour (see instr.) 1,265
10. Pilot and Purge 0
11. Used for lease operations (specify in Remarks) 0
Official
12. Other (see instructions) 0 �pQrtly
Authorization >1 hr: J Use
MCF
. � ,
Safety / ,/K
13. TOTAL VOLUME (ITEMS 6 -12) 13,437,750 MCF
Lease Use
14. NGL Gas Equivalent
MCF
Conservation
15. Purchased gas 1 ,771 ,518
Waste MCF
16. Transferred from: �'0-0
C i i r / Date
17. Transferred to: (Express as a negative #)
18. Remarks: Blocks 6 - 13 include only produced gas from Northstar (i.e. no purchased gas). Gas purchased from PBU was used as follows (all in mscf): fuel gas
678,522, pilot purge 2581, injection 1,090,415.
I hereby certify that the for - going is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature / / tom Abp. Title Manager, Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
v temperature of 60o F. Authority 20
Printed Name Bernard W. Hajny Phone (907)564 - 5028 Date /� AAC25.235.
Form 10 -422 Rev. 1/2004 Submit in Duplicate
Northstar Gas Flaring Incident Report
2/1/2008 - 2/29/2008
Start Date / Time End Date / Time Minutes MCF Incident Cause / Description Remediation Taken Event Type Flare
Planned Less Than 1 Hour
Group Total 1,070
Planned Greater Than 1 Hour
02/23/2008 17:21 02/23/2008 20:15 174.00 579 LP Start N/A LP Purge Gas LP
02/23/2008 17:27 02/23/2008 20:27 180.00 459 LP Start N/A LP Purge Gas HP1
Group Total 1,038
Unplanned Less Than 1 Hour
Group Total 474
Unplanned Greater Than 1 Hour
02/01/2008 06:29 02/01/2008 07:42 73.00 227 Lost LP due to IP seperator upset. get seperator pressure under control. Equipment Outage HP1
Group Total 227
Report Total 2,809
FlarelncidentDetails 02 -2008 FINAL.xls 3/7/2008 9:45 AM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
0290000025 N1 Northstar BP Mar - 2008
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 0 Pool Name Pool Code Percent
7. Reinjected 14,691,629 Northstar 590100 100.0%
Northstar 590500 0.0%
8. Flared or vented 1 hour or less 188
9. Flared or vented more than 1 hour (see instr.) 6,885
10. Pilot and Purge 0
11. Used for lease operations (specify in Remarks) 0
12. Other (see instructions) 0 Official Use Only
Authorization >1 hr: , MCF /
Safet �r CC ,�
13. TOTAL VOLUME (ITEMS 6 -12) 14,698,702 y L r � wv
MCF
Lease Use
14. NGL Gas Equivalent
MCF
Conservation
15. Purchased gas 1,916,006
Waste: MCF
/7
16. Transferred from: CjAre)
' Commissioner I a
17. Transferred to: (Express as a negative #)
18. Remarks: Blocks 6 - 13 include only produced gas from Northstar (i.e. no purchased gas). Gas purchased from PBU was used as follows (all in mscf): fuel gas
735,135, pilot purge 2759, injection 1,178,112.
I hereby certify that the f egoing is true an corr t the best of my knowledge.
Note: All volumes must be corrected
Signature Title Manager, Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Bernard W. Hajny Phone (907)564 -5028 Date / — AAC25.235.
Form 10 -422 Rev. 1/2004 Submit in Duplicate
Northstar Gas Flaring Incident Report
3/1/2008 - 3/31/2008
Start Date / Time End Date / Time Minutes MCF Incident Cause / Description Remediation Taken Event Type Flare
Planned Less Than 1 Hour
Group Total 128
Planned Greater Than 1 Hour
03/17/2008 23:10 03/18/2008 02:24 194.00 1,606 Flaring off of the test separator while unloading NS- Complete flowback and return systems to normal. Other HP1
06 acid job to the well clean -up tank.
03/31/2008 03:59 03/31/2008 05:04 65.00 99 Depressured Test separator for well flow Closed when well flow back was complete Well Outage HP1
Group Total 1,704
Unplanned Less Than 1 Hour
Group Total 60
Unplanned Greater Than 1 Hour
03/16/2008 05:55 03/16/2008 13:03 428.00 1,656 LP compressor outage due to ice plug in the 1st Start LP compressor and return to normal Equipment Outage LP
stage discharge cooler. operations.
03/16/2008 06:04 03/16/2008 13:12 428.00 1,688 LP compressor outage due to ice plug in the 1st Start LP compressor and return to normal Equipment Outage HP1
stage discharge cooler. operations.
03/16/2008 13:05 03/16/2008 18:12 307.00 926 LP compressor outage due to ice plug in the 1st Start LP compressor and return to normal Equipment Outage LP
stage discharge cooler. operations.
03/16/2008 13:14 03/16/2008 16:17 183.00 552 LP compressor outage due to ice plug in the 1st Start LP compressor and return to normal Equipment Outage HP1
stage discharge cooler. operations.
03/16/2008 16:31 03/16/2008 18:21 110.00 359 LP compressor outage due to ice plug in the 1st Start LP compressor and return to normal Equipment Outage HP1
stage discharge cooler. operations.
Group Total 5,181
Report Total 7,073
FlarelncidentDetails 03 -2008 FINAL.xls 4/4/20082:51 PM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
0290000025 N1 Northstar BP Apr - 2008
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total
Volume.
6. Sold 0 Pool Name Pool Code Percent
7. Reinjected 12,453,355 Northstar 590100 100.0%
Northstar 590500 0.0%
8. Flared or vented 1 hour or less - SEE REMARKS 3,053
.
9. Flared or vented more than 1 hour (see instr.) 5,306
10. Pilot and Purge 0
' 11. Used for lease operations (specify in Remarks) 0
12. Other (see instructions) 0 Official Use Only
Authorization >1 hr: MCF / ,
r Safety G ei:S ,4it.+.
13. TOTAL VOLUME (ITEMS 6 -12) RECEIVE f . 12,461,714 —
MCF
Lease Use
14. NGL Gas Equivalent
MAY 2 3 2008 Conservation 1 MCF {
15. Purchased gas 1,609,675
Waste: MCF
Alaska ��
16. Transferred from: ®� Corn. � �' D/ , ( _ D A or 6'
Commissioner Date
17. Transferred to: (Express as a negative #)
18. Remarks: Blocks 6 - 13 include only produced gas from Northstar (i.e. no purchased gas). Gas purchased from PBU was used as follows (all in mscf): fuel gas
635,149, pilot purge 2670, injection 971,502, flare 354. PBU gas was flared on 4/29 and 4/30 when Northstar production was shut down.
I hereby certify that the foregoing is true and correct o the best of my knowledge.
Note: All volumes must be corrected
Signature 6.A.../ Title Manager, Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
�f temperature of 60o F. Authority 20
Printed Name Bernard W. Hajny Phone (907)564 - 5028 Date ,� 9�� AAC25.235.
Form 10 -422 Rev. 1/2004 Submit in Duplicate
II
Northstar Gas Flaring Incident Report
4/1/2008 - 4/30/2008
Start Date / Time End Date / Time Minutes MCF Incident Cause / Description Remediation Taken Event Type Flare
Planned Less Than 1 Hour
Group Total 1,319 includes 296 mscf of PBU gas flared on 4/29
Planned Greater Than 1 Hour
04/05/2008 21:19 04/06/2008 00:04 165.00 257 Commisioning NS -16. Keeping test sep pressure Commissioning HP1
low to enhance flowback.
04/08/2008 03:36 04/08/2008 04:50 74.00 139 Flaring from the test separator. Unloading NS -11 Planned flaring. Unloaded the well and Other HP1
through the test separator and well clean -up tank returned it to normal production.
following a scheduled acid stimulation job.
04/08/2008 05:04 04/08/2008 07:37 153.00 184 Flaring from the test separator. Unloading NS -11 Planned flaring. Unloaded the well and Other HP1
through the test separator and well clean -up tank returned it to normal production.
following a scheduled acid stimulation job.
04/08/2008 09:28 04/08/2008 11:12 104.00 168 Flaring from the test separator. Unloading NS -11 Planned flaring. Unloaded the well and Other HP1
through the test separator and well clean -up tank returned it to normal production.
following a scheduled acid stimulation job.
04/10/2008 12:59 04/10/2008 14:50 111.00 208 Acid flowback on NS -16, lowering test separator Other HP1
pressure
04/18/2008 10:54 04/18/2008 13:36 162.00 302 Depressure Test Separator For NS -!9 N/A Commissioning HP1
04/28/2008 00:20 04/28/2008 03:29 189.00 1,252 planned TAR N/A Equipment Outage HP1
Group Total 2,511
Unplanned Less Than 1 Hour
Group Total 2,088 includes 58 mscf of PBU gas flared on 4/30
Unplanned Greater Than 1 Hour
04/01/2008 21:02 04/01/2008 22:26 84.00 177 LP compressor shutdown Restarted LP Compressor Upset HP1
04/01/2008 21:04 04/01/2008 22:24 80.00 205 LP compressor shutdown Restarted LP Compressor Upset LP
04/02/2008 22:02 04/03/2008 02:55 293.00 1,237 LP compressor shutdown Cut back wells until compressor was Equipment Outage HP1
restarted
04/02/2008 22:02 04/03/2008 02:50 288.00 1,176 LP compressor shutdown Cut back wells until compressor was Equipment Outage LP
restarted
Group Total 2,795
Report Total 8,713 (Northstar gas 8359 mscf, imported PBU gas 354
mscf)
FlarelncidentDetails 04 -2008 FINAL.xls 5/6/2008 3:00 PM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED G AS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
0290000025 N1 Northstar BP May - 2008
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total
Volume.
6. Sold 0 Pool Name Pool Code Percent
7. Reinjected 11,061,259 Northstar 590100 100.0%
Northstar 590500 0.0%
8. Flared or vented 1 hour or less - SEE REMARKS 3,695
9. Flared or vented more than 1 hour (see instr.) 19,139
10. Pilot and Purge 0
11. Used for lease operations (specify in Remarks) 0
.Cafflclal Use•4n e
12. Other (see instructions) 0
Authorization >1 hr: MCF
Safety r � 2 . 4 ,.
,�
13. TOTAL VOLUME (ITEMS 6 -12) 11 ,084,093 J MCF
Lease Use
14. NGL Gas Equivalent
MCF
Conservation
15. Purchased gas 1,482,129
Waste: MCF
16. Transferred from:
Commissioner ate
17. Transferred to: (Express as a negative #)
18. Remarks: Blocks 6 - 13 include only produced gas from Northstar (i.e. no purchased gas). Gas purchased from PBU was used as follows (all in mscf): fuel gas
580,717, pilot purge 2759, injection 898,523, flare 130. PBU gas was flared on 5/3 when Northstar production was shut down.
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature de/1AL C y r Title Manager, Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
fpm temperature of 60o F. Authority 20
Printed Name Bernard W. Hajny Phone (907)564 - 5028 Date AAC25.235.
Form 10 -422 Rev. 1/2004 Submit in Duplicate
Northstar Gas Flaring Incident Report
5/1/2008 - 5/31/2008
Start Date / Time End Date / Time Minutes MCF Incident Cause / Description Remediation Taken Event Type Flare
Planned Less Than 1 Hour
Group Total 704
Planned Greater Than 1 Hour
05/04/2008 20:33 05/05/2008 21:22 1,489.00 5,332 Plant restart following annual turn - around (outage) Control flare rates with production wells until gas Plant Startup LP
for planned maintenance. compressors are started.
05/04/2008 23:09 05/05/2008 21:29 1,340.00 3,253 Plant restart following annual turn - around (outage) Control flare rates with production wells until gas Plant Startup HP1
for planned maintenance. compressors are started.
05/17/2008 11:49 05/17/2008 12:59 70.00 87 Lowering test separator pressure to unload NS -34 Put well into production when unloaded Commissioning HP1
Group Total 8,672
Unplanned Less Than 1 Hour
Group Total 3,121 includes 130 mscf of PBU gas flared on 5/3
Unplanned Greater Than 1 Hour
05/09/2008 13:42 05/09/2008 15:14 92.00 181 CPS power failure cascaded into a loss of fuel Opening wells to restart plant, equipment. HPB Start Gas LP
gas at Northstar.
/ 05/09/2008 16:09 05/09/2008 20:05 236.00 807 CPS power failure cascaded into a loss of fuel Bringing wells on. HPB is running. Starting LP Other LP
(\ gas at Northstar. Flaring from LP vessels until LP compressor.
compressor is re- started.
05/09/2008 16:15 05/09/2008 20:12 237.00 1,007 CPS power failure cascaded into a loss of fuel Bringing wells on. HPB is running. Starting LP Other HP1
gas at Northstar. Flaring from IP separator until compressor.
LP compressor is re- started.
05/12/2008 01:46 05/12/2008 19:01 1,035.00 3,895 HP Separator LAHH failed high causing an OSD Manage wells to mitigate flaring during LP Other LP
and LP compressor S /D. Experienced difficulty re- Compressor start attempts.
starting LP Compressor. LP flaring from low
pressure vessels.
05/12/2008 01:54 05/12/2008 19:09 1,035.00 3,508 HP Separator LAHH failed high causing an OSD Manage wells to mitigate flaring during LP Other HP1
and LP compressor S /D. Experienced difficulty re- Compressor start attempts.
starting LP Compressor. HP flaring from IP
separator.
05/15/2008 18:35 05/15/2008 19:50 75.00 647 HPA- S/D on a bad card Brought machine back up when safe Equipment Outage HP1
05/30/2008 17:42 05/30/2008 19:15 93.00 277 Hydrates in feed gas coolers caused system to cooked feed gas coolers. Upset HP1
back up and flare
05/30/2008 21:39 05/30/2008 23:07 88.00 146 Hydrates in feed gas coolers caused system to cooked feed gas coolers. Upset LP
back up and flare
Group Total 10,467
Report Total 22,964 (Northstar gas 22834 mscf, imported PBU gas
130 mscf)
NSTR FlarelncidentDetails 05 -2008 FINAL.xls 6/12/2008 9:34 AM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
0290000025 N1 Northstar BP Jun - 2008
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total
Volume.
6 Sold 0 Pool Name Pool Code Percent
7. Reinjected 15,279,724 Northstar 590100 100.0
Northstar 590500 0.0%
8. Flared or vented 1 hour or less 6,027
9. Flared or vented more than 1 hour (see instr.) 4,909
10. Pilot and Purge 0
11. Used for lease operations (specify in Remarks) 0
12. Other (see instructions) 0 Offiotal Use Only
Authorization >1 hr: 17/ MCF
Safety
13. TOTAL VOLUME (ITEMS 6 -12) 15,290,660 MCF
Lease Use
14. NGL Gas Equivalent
MCF
Conservation
15. Purchased gas 953,850
Waste: MCF
16. Transferred from: D cQ i3 - g
T Co issioner 6 � Date
17. Transferred to: (Express as a negative #)
18. Remarks: Blocks 6 - 13 include only produced gas from Northstar (i.e. no purchased gas). Gas purchased from PBU was used as follows (all in mscf): fuel gas
613,256, pilot purge 2670, injection 337,924.
I hereby certify that the fo Ding is true nd Corr ct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Manager, Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
_ /ry (/ tem of 60o F. Authority 20
gL�
Printed Name Bernard W. Hajny Phone (907)564 -5028 Date O b AAC25.235.
Form 10 -422 Rev. 1/2004 Submit in Duplicate
4 . Y
Northstar Gas Flaring Incident Report
6/1/2008 - 6/30/2008
Start Date / Time End Date / Time Minutes MCF Incident Cause / Description Remediation Taken Event Type Flare
Planned Less Than 1 Hour
Group Total 551
Planned Greater Than 1 Hour
06/29/2008 09:28 06/29/2008 11:12 104.00 219 Starting up plant, opening wells. Bringing on wells for H.P. and L.P. startup. Plant Startup LP
06/29/2008 09:46 06/29/2008 10:59 73.00 121 Starting up plant, opening wells. Bringing on wells for H.P. and L.P. startup. Plant Startup HP1
06/29/2008 11:07 06/29/2008 14:59 232.00 480 Starting up plant, opening wells. Bringing on wells for H.P. and L.P. startup. Plant Startup HP1
06/29/2008 11:19 06/29/2008 14:57 218.00 652 Starting up plant, opening wells. Bringing on wells for H.P. and L.P. startup. Plant Startup LP
Group Total 1,473
Unplanned Less Than 1 Hour
Group Total 5,476
Unplanned Greater Than 1 Hour
06/05/2008 14:58 06/05/2008 16:38 100.00 561 Loss of C solar resulted in L.P. Restated solar and L.P. compressor. Upset LP
compressor trip and flaring
06/05/2008 14:59 06/05/2008 16:45 106.00 399 Loss of C solar resulted in L.P. Restated solar and L.P. compressor. Upset HP1
compressor trip and flaring
06/18/2008 18:18 06/18/2008 20:26 128.00 560 Inadvertent ESD LP Compressor Restart Equipment Outage HP1
06/18/2008 18:43 06/18/2008 20:21 98.00 383 Inadvertent ESD LP Compressor Restart Equipment Outage LP
06/28/2008 08:50 06/28/2008 11:28 158.00 329 Lost H.P. and L.P. compressors. Trying to restart and cutting wells. Upset LP
l 06/28/2008 09:50 06/28/2008 12:09 139.00 776 Lost H.P. and L.P. compressors. Trying to restart and cutting wells. Upset HP1
06/28/2008 11:34 06/28/2008 12:37 63.00 32 Lost H.P. and L.P. compressors. Trying to restart and cutting wells. Upset LP
06/28/2008 13:39 06/28/2008 15:17 98.00 37 Lost H.P. and L.P. compressors. Trying to restart and cutting wells. Upset LP
06/28/2008 19:13 06/28/2008 21:00 107.00 44 facility is shutdown mode. due to vented vessels Upset LP
proration and vessels were venting
06/30/2008 09:49 06/30/2008 13:01 192.00 77 TEG system upset. Adjusting rates, temperatures Upset LP
/
06/30/2008 17:33 06/30/2008 22:30 297.00 114 TEG system upset. Adjusting rates, temperatures Upset LP
\ 06/30/2008 23:00 07/01/2008 03:28 268.00 126 TEG system upset. High reboiler Adjusting flow rates and temperatures. Upset LP
Group Total 3,436
Report Total 10,936
NSTR FlarelncidentDetails 06 -2008 FINAL.xls 7/8/2008 1:14 PM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
0290000025 N1 Northstar BP Jul -2008
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 0 Pool Name Pool Code Percent
7. Reinjected 15,802,452 Northstar 590100 100.0°
Northstar 590500 0.0% %
.0 /o
8. Flared or vented 1 hour or less 3,016
9. Flared or vented more than 1 hour (see instr.) 925
10. Pilot and Purge 0
11. Used for lease operations (specify in Remarks) 0
a ,.,.:. t : ° u'• ; .:: ,,Ot. tlseOnly
12. Other (see instructions) 0
Authorization >1 hr. � MCF
Safety
13. TOTAL VOLUME (ITEMS 6 -12) 15,806,393 MCF
Lease Use
14. NGL Gas Equivalent
MCF
Conservation
15. Purchased gas 1,187,278
Waste: MCF
16. Transferred from:
Commissio r Date
17. Transferred to: (Express as a negative #)
18. Remarks: Blocks 6 - 13 include only produced gas from Northstar (includes tract operation NS34A but not gas from PBU). Gas purchased from PBU was used
as follows (all in mscf): fuel gas 642,680 pilot purge 2759, injection 541,839.
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
(LULL_ Signature �s.�(„(, , Title Manager, Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Bernard W. Hajny Phone (907)564 -5028 Date AAC25.235.
Form 10 -422 Rev. 1/2004 Submit in Duplicate
■
P.
Northstar Gas Flaring Incident Report
7/1/2008 - 7/31/2008
Start Date / Time End Date / Time Minutes MCF Incident Cause / Description Remediation Taken Event Type Flare
Planned Less Than 1 Hour
Group Total 0
Planned Greater Than 1 Hour
Group Total 0
Unplanned Less Than 1 Hour
Group Total 3,016
Unplanned Greater Than 1 Hour
7/1/2008 3:31 7/1/2008 5:10 99 42 TEG system upset. High reboiler pressure. Adjusting flow rates and temperatures. Upset LP
7/1/2008 5:36 7/1/2008 13:54 498 228 TEG system upset. High reboiler pressure. Adjusting flow rates and temperatures. Upset LP
7/2/2008 16:43 7/2/2008 18:26 103 43 Adjusting well sets. Cut back on swing wells. Upset LP
7/2/2008 19:09 7/2/2008 20:46 97 41 Adjusting well sets. Cut back on swing wells. Upset LP
7/2/2008 21:25 7/2/2008 23:06 101 44 Adjusting well sets. Cut back on swing wells. Upset LP
7/5/2008 17:06 7/5/2008 19:20 134 527 Attemping to do a HP start up. Adjusted swing wells to lower flare. Plant Startup LP
Group Total 925
Report Total 3,941
NSTR FlarelncidentDetails 07 -2008 FINAL.xls 8/7/2008 11:31 AM
•
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
0290000025 N1 Northstar BP Aug -2008
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total
Volume.
6. Sold 0 Pool Name Pool Code Percent
7. Reinjected 15,364,284 Northstar 590100 100.0%
Northstar 590500 0.0%
8. Flared or vented 1 hour or less 1,282
9. Flared or vented more than 1 hour (see instr.) 1,900
10. Pilot and Purge 0
11. Used for lease operations (specify in Remarks) 0
12. Other (see instructions) 0 t$
Authorization >1 hr: MCF �,�{�
Safety ° /
13. TOTAL VOLUME (ITEMS 6 -12) 15,367,466 MCF
Lease Use
14. NGL Gas Equivalent MCF
1,248,233 Conservation
15. Purchased gas
Waste: MCF
16. Transferred from: 'Q —06
/wi Date
17. Transferred to: (Express as a negative #)
18. Remarks: Blocks 6 - 13 include only produced gas from Northstar (includes tract operation NS34A but not gas from PBU). Gas purchased from PBU was used as
follows (all in mscf): fuel gas 633,147 pilot purge 2759, injection 612,327.
_.c
I hereby certify that the foregoing is true and correct to the best of my knowledge.
° Note: volumes must corrected
f�
Signature ja.i�'i.�'t.� //L� Title Manager, Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
/ temperature of 60o F. Authority 20
VI /
Printed Name Bernard W. Hajny Phone (907)564 -5028 Date 1 e �1 / AAC25.235.
Form 10 -422 Rev. 1/2004 «/ Submit in Duplicate
Northstar Gas Flaring Incident Report
8/1/2008 - 8/31/2008
Start Date / Time End Date / Time Minutes MCF Incident Cause / Description Remediation Taken Event Type Flare
Planned Less Than 1 Hour
Group Total 482
Planned Greater Than 1 Hour
08/16/2008 14:45 08/16/2008 16:28 103.00 . 74 Shutdown LP Compressor for TAPS shutdown. Depressuring LP for shutdown of facility for Plant Integrity LP
maintenance during shutdown.
08/17/2008 13:35 08/17/2008 18:58 323.00 956 LP compressor shutdown after trying to start Restart LP Compressor Plant Integrity LP
08/17/2008 14:41 08/17/2008 19:04 263.00 637 LP compressor shutdown after trying to start Restart LP Compressor Plant Integrity HP1
Group Total 1,667
Unplanned Less Than 1 Hour
Group Total 800
Unplanned Greater Than 1 Hour
08/30/2008 14:07 08/30/2008 15:22 75.00 96 Bumped the HP Flare off of the HP Separator Backed off swing well. Flaring stopped Upset HP1
pressure control valve to flare.
08/31/2008 16:40 08/31/2008 17:58 78.00 138 Bumped the HP Flare off of the HP Separator Backed off swing well. Flaring stopped Upset HP1
pressure control valve to flare.
Group Total 233
Report Total 3,182
NSTR FlarelncidentDetails 08 -2008 FINAL.xls 9/5/2008 4:03 PM
4
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
0290000025 N1 Northstar BP Sep -2008
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total
Volume.
6. Sold 0 Pool Name Pool Code Percent
7. Reinjected 15,814,300 Northstar 590100 100.0%
i Northstar 590500 0.0%
8. Flared or vented 1 hour or less 1,764
9. Flared or vented more than 1 hour (see instr.) 3,360
10. Pilot and Purge 0
11. Used for lease operations (specify in Remarks) 0 -
12. Other (see instructions) 0 Authorization >1 hr: 3 ' ^ MCF ^`
Safety �U
13. TOTAL VOLUME (ITEMS 6 -12) 15,819,424 MCF
Lease Use
14. NGL Gas Equivalent MCF
Conservation
15. Purchased gas 1,323,577
Waste: MCF
16. Transferred from: Zd -68
C missioner " Date
17. Transferred to: (Express as a negative #)
18. Remarks: Blocks 6 - 13 include only produced gas from Northstar (includes tract operation NS34A but not gas from PBU). Gas purchased from PBU was used as
follows (all in mscf): fuel gas 648,028 pilot purge 2670, injection 672,879.
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Manager, Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Paul D. Syring Phone (907)564 -5028 Date /Q / 4 AAC25.235.
Form 10 -422 Rev. 1/2004 Submit in Duplicate
s ,
Northstar Gas Flaring Incident Report
9/1/2008 - 9/30/2008
Start Date / Time End Date / Time Minutes MCF Incident Cause / Description Remediation Taken Event Type Flare
Planned Less Than 1 Hour
Group Total 106
Planned Greater Than 1 Hour
Group Total 0
Unplanned Less Than 1 Hour
Group Total 1,658
Unplanned Greater Than 1 Hour
09/20/2008 16:35 09/20/2008 23:08 393.00 1,606 MI cable failure caused LP shut down Shut in wells Upset HP1
09/20/2008 16:58 09/20/2008 23:01 363.00 1,754 MI cable failure caused LP shut down Shut in wells Upset LP
Group Total 3,360
Report Total 5,124
NSTR FlarelncidentDetails 09 -2008 FINAL.xls 10/6/2008 2:58 PM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
0290000025 N1 Northstar BP Oct -2008
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total
Volume.
6. Sold 0 Pool Name Pool Code Percent
7. Reinjected 14,747,435 Northstar 590100 100.0%
Northstar 590500 0.0%
8. Flared or vented 1 hour or less 5,039
9. Flared or vented more than 1 hour (see instr.) 2,962
10. Pilot and Purge 0
11. Used for lease operations (specify in Remarks) 0
12. Other (see instructions) 0 Authorization >1 hr: MCF
Safety 2 g6 y
13. TOTAL VOLUME (ITEMS 6 -12) 14,755,436 MCF
Lease Use
14. NGL Gas Equivalent
MCF
Conservation
15. Purchased gas 1,364,819
Waste: n MCF
16. Transferred from: � , % �
az( Commissioner Da
17. Transferred to: (Express as a negative #)
18. Remarks: Blocks 6 - 13 include only produced gas from Northstar (includes tract operation NS34A but not gas from PBU). Gas purchased from PBU was used as
follows (all in mscf): fuel gas 628,191 pilot purge 2759, injection 733,869.
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: Alt volumes must be corrected
Signature Title Manager, Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
f temperature of 60o F. Authority 20
Printed Name Paul D. Syring Phone (907)564 -5028 Date /1 I i 3'O AAC25.235.
Form 10-422 Rev. 1/2004 Submit in Duplicate
•
Northstar Gas Flaring Incident Report
10/1/2008 - 10/31/2008
Start Date / Time End Date / Time Minutes MCF Incident Cause / Description Remediation Taken Event Type Flare
Planned Less Than 1 Hour
Group Total 1,758
Planned Greater Than 1 Hour
Group Total 0
Unplanned Less Than 1 Hour
Group Total 3,281
Unplanned Greater Than 1 Hour
10/04/2008 00:46 10/04/2008 06:24 338.00 1,072 Plant Shut -Down Restart Equipment Outage LP
10/04/2008 00:48 10/04/2008 06:29 341.00 845 Plant Shut -Down Restart Equipment Outage HP1
10/17/2008 15:25 10/17/2008 17:46 141.00 490 Lost LP due to vibration probe. Shut in high gas wells. Upset LP
10/17/2008 15:26 10/17/2008 17:49 143.00 555 Lost LP due to vibration probe. Shut in high gas wells. Upset HP1
Group Total 2,962
Report Total 8,001
NSTR FlarelncidentDetails 10 -2008 FINAL.xls 11/13/2008 10:03 AM
1' ,
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
0290000025 N1 Northstar BP Nov -2008
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total
Volume.
6. Sold 0 Pool Name Pool Code Percent
7. Reinjected 16,975,656 Northstar 590100 100.0%
Northstar 590500 0.0%
8. Flared or vented 1 hour or less 799
9. Flared or vented more than 1 hour (see instr.) 0
10. Pilot and Purge 0
11. Used for lease operations (specify in Remarks) 0
12. Other (see instructions) 0 Authorization >1 hr: MCF
Safety
13. TOTAL VOLUME (ITEMS 6 -12) 16,976,455 MCF
Lease Use
14. NGL Gas Equivalent
MCF
Conservation
15. Purchased gas 1,397,487
Waste: MCF
16. Transferred from:
Commissioner Date
17. Transferred to: (Express as a negative #)
18. Remarks: Blocks 6 - 13 include only produced gas from Northstar (includes tract operation NS34A but not gas from PBU). Gas purchased from PBU was used as
follows (all in mscf): fuel gas 676,931 pilot purge 2670, injection 717,886.
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Manager, Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Paul D. Syring Phone (907)564 -5028 Date / ; 6 AAC25.235.
Form 10 -422 Rev. 1/2004 Submit in Duplicate
Northstar Gas Flaring Incident Report
11/1/2008 -11 /30/2008
Start Date / Time End Date / Time Minutes MCF Incident Cause / Description Remediation Taken Event Type Flare
Planned Less Than 1 Hour
Group Total 376
Planned Greater Than 1 Hour
Group Total 0
Unplanned Less Than 1 Hour
Group Total 423
Unplanned Greater Than 1 Hour
Group Total 0
Report Total 799
NSTR FlarelncidentDetails 11 -2008 FINAL.xls 12/5/2008 9:40 AM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
0290000025 N1 Northstar BP Dec -2008
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total
Volume.
6. Sold 0 Pool Name Pool Code Percent
7. Reinjected 16,544,022 Northstar 590100 100.0%
Northstar 590500 0.0%
8. Flared or vented 1 hour or less 2,908
9. Flared or vented more than 1 hour (see instr.) 0
10. Pilot and Purge 0
11. Used for lease operations (specify in Remarks) 0
12. Other (see instructions) 0
Authorization >1 hr: MCF
Safety
13. TOTAL VOLUME (ITEMS 6 -12) 16,546,930 MCF
Lease Use
14. NGL Gas Equivalent
MCF
Conservation
15. Purchased gas 1,708,989
Waste: MCF
16. Transferred from:
Commissioner Date
17. Transferred to: (Express as a negative #)
18. Remarks: Blocks 6 - 13 include only produced gas from Northstar (includes tract operation NS34A but not gas from PBU). Gas purchased from PBU was used as
follows (all in mscf): fuel gas 697,399 pilot purge 2759, injection 1,008,831.
I hereby certify_that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Manager, Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
j temperature of 600 F. Authority 20
Printed Name Paul D. Syring Phone (907)564 -5028 Date /j� 1 � c AAC25
Form 10 -422 Rev. 1/2004 Submit in Duplicate
Northstar Gas Flaring Incident Report
12/1/2008 -12/31 /2008
Start Date / Time End Date / Time Minutes MCF Incident Cause / Description Remediation Taken Event Type Flare
Planned Less Than 1 Hour
Group Total 942
Planned Greater Than 1 Hour
Group Total 0
Unplanned Less Than 1 Hour
Group Total 1,966
Unplanned Greater Than 1 Hour
Group Total 0
Report Total 2,908
NSTR FlarelncidentDetails 12 -2008 FINAL.xls 1/5/2009 3:50 PM