Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPBU CCP/FFGU / BP Exploration STATE OF ALASKA AOGCC GAS DISPOSITION FILES YEAR: 2008 FACILITY: PBU CCP /FFGU OPERATOR: BP EXPLORATION r STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3 Field 4 Operator 5. Month/Year of Disposition 0290000000 PBU CCP /FFGU PBU - EOA BP January - 2008 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 2,513,328 Pool Name Pool Code Percent 7. Reinjected 231,724,369 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 1,291 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 33,293 11. Used for lease operations (specify in Remarks) 6,315,764 Official Use Only 12. Other (see instructions + 0 Authorization >1 hr: MCF ( * y� Safety 13. TOTAL VOLUME (ITEMS 6 -12) 240,588,045 MCF Lease Use 14. NGL Gas Equivalent FEB 2 0 2008 0 MCF Conservation 15. Purchased gas Alaska Oil a Cons. Comm� 0 Waste: MCF 16. Transferred from: CGF & FS1 a 240,645,621 Commissioner Date 17. Transferred to: (Express as a negative #) - 57,576 18. Remarks: Block 11: Fuel Gas = 6,315,764 mscf and Assist Gas = 0 mscf; Block 17: Fuel Gas to LPC = 57,576 mscf I hereby certify that the foregoing i rue d correct to the best of my knowledge. Note: All volumes must be Signature Title Manager, Production Taxes and Royalty corrected to pressure of 14.65 psis and to a temperature of 60o F. Printed Name Bernard W. Hajny Phone (907)564 - 5028 Date .2-/Y 7 ! ) 2 Authority 20 AAC25.235. Form 10 -422 Rev. 1/2004 Submit in Duplicate BP EXPLORATION (ALASKA) INC. Page 1 PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT January 2008 'Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 1/9/2008 0914 -0921 408 Not required for unplanned events which Not required for unplanned events which 1/27/2008 1015 -1020 135 are less than or equal to 1 hour are less than or equal to 1 hour 1/27/2008 1728 -1733 135 1/28/2008 1700 -1705 135 1/29/2008 0845 -0850 135 1/31/2008 1630 -1640 141 TOTAL 1,089 'Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 1/25/2008 1930 -1935 141 See attachments See attachments 1/27/2008 0400 -0405 45 1/27/2008 2135 -2140 8 1/29/2008 2109 -2115 8 TOTAL 202 'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 1,089 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 202 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 33,293 Assist 0 2/7/2008 10:14 AM TOTAL FLARED VOLUME 34,584 Flare Start Date 1/1/2008 Flare End Date 1/31/2008 CCP Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF) 08 -46 Ctrld Blowdwn 1/25/2008 7:30:00 PM 7:35:00 PM 5 minutes No No Yes BP1 \ERHARTRD 141 Determination Cause T/C 1808 ESD for water wash Action Taken T/C 1805 depressured 08 -51 Ctrld Blowdwn 1/27/2008 4:00:00 AM 4:05:00 AM 5 minutes No No Yes BP1 \ERHARTRD 45 Determination Cause Pressure testing T/C 1808 Action Taken Pressure testing completed 08 -51 Ctrld Blowdwn 1/27/2008 9:35:00 PM 9:40:00 PM 5 minutes No No Yes BP1 \ERHARTRD 8 Determination Cause T/C 1802 esd from 50 pis to blow unit completely down for iso work. Action Taken Depressure complete 08 -57 Ctrld Blowdwn 1/29/2008 9:09:00 PM 9:15:00 PM 6 minutes No No Yes BP1 \STROTHJG 8 Determination Cause TIC 1807 blew down to atmos pressure Action Taken T/C 1807 pressure at zero. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition 0290000000 _PBU CCP /FFGU PBU - EOA BP February Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 2,340,394 Pool Name Pool Code Percent 7. Reinjected 213,420,862 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 872 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 27,086 11. Used for lease operations (specify in Remarks) 5,925,074 Official Use Only 12. Other (see instructions) 0 Authorization >1 hr: MCF Safety 13. TOTAL VOLUME (ITEMS 6 -12) 221 ,714,288 MCF Lease Use 14. NGL Gas Equivalent 0 MCF Conservation 15. Purchased gas 0 Waste: MCF 16. Transferred from: CGF & FS1 221 ,747,448 Commissioner Date 17. Transferred to: (Express as a negative #) - 33,160 18. Remarks: Block 11: Fuel Gas = 5,925,074 mscf and Assist Gas = 0 mscf; Block 17: Fuel Gas to LPC = 33,160 mscf I hereby certify that the f• egoing is tr- and orrect to the best of my knowledge. / Note: All volumes must be A wl." Title Title Manager, Production Taxes and Royalty corrected to pressure of 14.65 psia �J 7 and to a temperature of 60o F. Printed Name Bernard W. Hajny Phone (907)564 - 5028 Date ? . ! / Authority 20 AAC25.235. Form 10 -422 Rev. 1/2004 Submit in Duplicate [ w BP EXPLORATION (ALASKA) INC. Page 1 PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT February 2008 'Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 2/8/2008 0810 -0815 45 Not required for unplanned events which Not required for unplanned events which 2/8/2008 1105 -1110 8 are less than or equal to 1 hour are less than or equal to 1 hour 2/9/2008 1520 -1525 8 2/23/2008 0945 -0950 159 2/23/2008 1315 -1320 135 TOTAL 355 'Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 'Planned Events Less Than or Equal 1 Flour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 2/2/2008 2210 -2225 51 See attachments See attachments 2/6/2008 1600 -1605 135 2/6/2008 2100 -2105 8 2/7/2008 1540 -1545 135 2/7/2008 1935 -1940 8 2/8/2008 0530 -0535 135 2/8/2008 2120 -2125 45 TOTAL 517 'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 355 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 517 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 27,086 Assist 0 3/6/2008 TOTAL FLARED VOLUME 27,958 3:46 PM • Flare Start Date 2/1/2008 Flare End Date 2/29/2008 CCP Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF) 08 -66 Ctrld Blowdwn 2/2 /2008 10:10:00 PM 10:25:00 PM 15 minutes No No Yes BP1 \PENNYSD 51 Determination Cause 1805 pressured tested then depressured Action Taken depressured 08 -77 Ctrld Blowdwn 2/6 /2008 4:00:00 PM 4:05:00 PM 5 minutes No No Yes BP1 \OVERTODH 135 Determination Cause T/C 1801 shutdown for water wash and maintaince Action Taken T/C 1801 depressured 08 -77 Ctrld Blowdwn 2/6/2008 9:00:00 PM 9:05:00 PM 5 minutes No No Yes BP1 \OVERTODH 8 Determination Cause T/C 1801 ESD from 50psi to Opsi for waterwash & PSV pm's. Action Taken T/C 1801 depressurization completed. 08 -78 Ctrld Blowdwn 2/7 /2008 3:40:00 PM 3:45:00 PM 5 minutes No No Yes BP1 \OVERTODH 135 Determination Cause T\C 1804 shutdown for unplanned maintenance Action Taken T/C 1804 depressured 08 -78 Ctrld Blowdwn 2/7 /2008 7:35:00 PM 7:40:00 PM 5 minutes No No Yes BP1 \OVERTODH 8 Determination Cause T/C 1804 ESD depressured from 50psi to Opsi. Action Taken 1804 T/C depressurization completed. Generated 3/3/2008 Flare Start Date 2/1/2008 Flare End Date 2/29/2008 CCP Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF) 08 -81 Ctrld Blowdwn 2/8/2008 5:30:00 AM 5:35:00 AM 5 minutes No No Yes BP1 \BAKERWF 135 Determination Cause T\C 1807 shutdown because of a vibration problem. Lost GC1 -A Action Taken TIC 1807 depressurization completed. 08 -81 Ctrld Blowdwn 2/8/2008 9:20:00 PM 9:25:00 PM 5 minutes No No Yes BP1 \BAKERWF 45 Determination Cause T/C 1804 depressured to 50 psig after spin drying. Action Taken T/C 1804 depressurization completed. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1, Facility Number 2. Facility Name 3. Field 14. Operator 5. Month/Year of Disposition 0290000000 PBU CCPIFFGU PBU - EOA ,BP March - 2008 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. e. Sold 2,499,434 Pool Name Pod Code Percent 7. Reinjected 229,838,899 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 1,268 9. Flared or vented more than 1 hour (see instr.) 0 to Pilot and Purge 32,844 11. Used for lease operations (spedfy in Remarks) 6,234,244 - _ Official llse't7nfy . . ; . , . 12, Other (see instructions) 0 Authorization >1 hr, MCF Safety 13. TOTAL VOLUME (ITEMS 8 - 12) 238,606,689 MCF Lease Use 14, NGL Gas Equivalent 0 — MCF Conservation 15, Purchased gas 0 Waste: MCF 16. Transferred from: CGF & FS1 238,624,786 Commissioner Date 17. Transferred to. (Express as a negative #) - 18,097 • 18, Remarks Block 11: Fuel Gas = 6,234,244 mscf and Assist Gas = 0 mscf; Block 17: Fuel Gas to LPC = 18,097 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be Signature ''. C Title Manager, Production Taxes and Royalty corrected to pressure of 14.65 psia and to a temperature of 60o F. Printed Name Paul D. S np Phone (907)564 - 5028 Date 1 — 3 — l 0 Authority 20 AAC25.235, Form 10 -422 Rev. 1/2004 Submit in Duplicate r . ST AE OF ASKA ' ALASKA OIL AND GAS T CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition 0290000000 PBU CCP /FFGU PBU - EOA _BP March - 2008 Disposition Volume MCF 20 For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 2,499,434 Pool Name Pool Code Percent 7. Reinjected 229,840,004 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 1,268 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 32,844 11. Used for lease operations (specify in Remarks) 6,233,139 Official Use Only 12. Other (see instructions) 0 Authorization >1 hr: MCF r Safety 13. TOTAL VOLUME (ITEMS 6 - E t1f9 E f• � 238,606,689 MCF ��r Lease Use 14. NGL Gas Equivalent 0 MCF APR 2 2 2008 Conservation 15. Purchased gas 0 Waste: MCF 16. Transferred from: CGanka O U a Gas Cons. Co mmission 238,624,786 Commissioner Date 17. Transferred to: (Express as a negative #) - 18,097 18. Remarks: Block 11: Fuel Gas = 6,233,139 mscf and Assist Gas = 0 mscf; Block 17: Fuel Gas to LPC = 18,097 mscf I hereby certify that the foregoing is true and c rr t to the best of my knowledge. Note: All volumes must be Signature 4 Title Manager, Production Taxes and Royalty corrected to pressure of 14.65 psia and to a temperature of 60o F. Printed Name Bernard W. Hajny Phone (907)564 - 5028 Date f l5 "DR Authority 20 AAC25.235. Form 10 -422 Rev. 1/2004 Submit in Duplicate BP EXPLORATION (ALASKA) INC. Page 1 PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT March 2008 'Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 3/12/2008 1040 -1045 152 Not required for unplanned events which Not required for unplanned events which 3/12/2008 1201 -1206 109 are less than or equal to 1 hour are less than or equal to 1 hour 3/12/2008 1320 -1325 152 3/12/2008 1628 -1633 109 3/21/2008 1615 -1620 141 TOTAL 663 'Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 3/9/2008 0045 -0050 420 See attachments See attachments 3/11/2008 1110 -1115 76 3/11/2008 1115 -1140 109 TOTAL 605 'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 663 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 605 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 32,844 Assist 0 TOTAL FLARED VOLUME 34,112 4/9/2008 9:48 AM J � Flare Start Date 3/1/2008 Flare End Date 3/31/2008 CCP Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF) 08 -122 Ctrld Blowdwn 3/9/2008 12:45:00 AM 12:50:00 AM 5 minutes No No Yes BP1 \SANFORSH 420 Determination Cause Manual S/D of T/C 1876 for maintenance /PSV's/WW Action Taken T/C 1876 depressured. 08 -126 Ctrld Blowdwn 3/11/2008 11:10:00 AM 11:15:00 AM 5 minutes No No Yes BP1 \TURNERG2 76 Determination Cause T/C 1876 Depressured after pressure test of associated PSV, Valves, and piping worked on during planned outage, no leaks. Valve F439 is not operating properly, T/C depressured for energy isolation and repair Action Taken of F439 valve. 1876 T/C depressurization completed. 08 -126 Ctrld Blowdwn 3/11/2008 11:15:00 PM 11:40:00 PM 25 minutes No No Yes BP1 \TURNERG2 109 Determination Cause T/C 1876 Depressured to 175 psi after pressure test. Valve F439 was repaired. Action Taken T/c 1876 depressured to 175 psi. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 14. Operator 5. MonthNear of Disposition 0290000000 PBU CCP /FFGU PBU - EOA BP April -2008 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 2,110,907 Pool Name Pool Code Percent 7 Reinjected 196,745,309 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 3,500 . 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 30,801 11. Used for lease operations (specify in Remarks) 5,672,765 --- Official U&e:S7nly ' . 12. Other (see instructions) 0 ,Authorization >1 hr MCF Safety 13. TOTAL VOLUME (ITEMS 6 -12) 204,563,282 MCF Lease Use 14. NGL Gas Equivalent 0 MCF Conservation 15. Purchased gas 0 Waste: MCF 16. Transferred from: GGF & FSt 204,563,282 Commissioner Date 17. Transferred to: (Express as a negative #) 0 18. Remarks: Block 11: Fuel Gas = 5,672,765 mscf and Assist Gas = 0 mscf; Block 17: Fuel Gas to LPC = 0 mscf , I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be Signature * -! me Manager, Production Taxes and Royalty corrected to pressure of 14.65 psia _ M and to a temperature of 60o F. "7- Printed Name Paul D. Syring Phone (907)564 -5028 Date Authority 20 AAC25.235, Form 10-422 Rev. 1/2004 Submit in Duplicate ,. . 1 I I ASKA OIL AND GAS STATE CONSERVAT ALASKA ION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition 0290000000 PBU CCP /FFGU PBU - EOA BP April - 2008 Disposition Volume MCF 20 For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 2,110,907 Pool Name Pool Code Percent 7. Reinjected 198,187,404 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 3,500 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 30,801 11. Used for lease operations (specify in Remarks) 4,230,670 Official Use Only --� 12. Other (see instructions) ® 0 r ; — Authorization >1 hr MCF Safety 13. TOTAL VOLUME (ITEMS 6 -12) 204,563,282 MCF MAY 2 3 ZUn Lease Use 14. NGL Gas Equivalent 0 MCF Conservation 15. Purchased gas Alva+ta Oil Vi ('„ ; s MM. Cantrnission 0 Waste. MCF Atictoiogo 16. Transferred from: CGF & FS1 204,563,282 Commissioner Date 17. Transferred to: (Express as a negative #) 0 18. Remarks: Block 11: Fuel Gas = 4,230,670 mscf and Assist Gas = 0 mscf; Block 17: Fuel Gas to LPC = 0 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be Signature 4 Title Manager, Production Taxes and Royalty corrected to pressure of 14.65 psia �/ and to a temperature of 60o F. Printed Name Berna d W. Hajny Phone (907)564 -5028 Date .. r - 7 D$ Authority 20 AAC25.235. Form 10 -422 Rev. 1/2004 Submit in Duplicate BP EXPLORATION (ALASKA) INC. Page 1 PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT April 2008 'Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 4/7/2008 1517 -1522 14 Not required for unplanned events which Not required for unplanned events which 4/10/2008 1825 -1830 35 are less than or equal to 1 hour are less than or equal to 1 hour 4/11/2008 0009 -0014 8 4/12/2008 0940 -0945 135 4/13/2008 1430 -1435 14 4/14/2008 0906 -0911 141 4/14/2008 1005 -1010 141 4/18/2008 1050 -1055 8 TOTAL 496 'Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 4/6/2008 0013 -0018 135 See attachments See attachments 4/6/2008 0142 -0147 156 4/6/2008 0230 -0235 14 4/6/2008 0425 -0430 11 4/6/2008 0529 -0534 141 4/6/2008 0927 -0932 14 4/6/2008 1800 -1805 51 4/6/2008 2236 -2241 14 4/7/2008 0105 -0110 135 4/7/2008 1345 -1350 8 4/7/2008 1511 -1516 14 4/9/2008 1922 -1927 156 4/9/2008 2123 -2128 11 4/10/2008 0835 -0840 135 4/10/2008 1000 -1005 14 4/10/2008 1417 -1422 159 4/11/2008 0323 -0328 141 4/11/2008 0459 -0504 14 4/11/2008 1051 -1056 93 5/8/2008 4/11/2008 2322 -2325 93 1:43 PM BP EXPLORATION (ALASKA) INC. Page 2 PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT d' GAS FLARING INCIDENT REPORT April 2008 4/12/2008 0010 -0015 8 4/12/2008 0429 -0434 156 4/12/2008 0710 -0715 8 4/12/2008 0835 -0840 8 4/12/2008 1130 -1135 14 4/13/2008 0325 -0330 77 4/13/2008 0925 -0930 8 4/13/2008 1255 -1300 135 4/13/2008 2020 -2025 45 4/14/2008 0003 -0008 135 4/14/2008 0225 -0230 14 4/14/2008 1930 -1935 408 4/14/2008 2224 -2229 152 4/15/2008 1940 -1945 109 4/15/2008 2113 -2118 109 4/16/2008 0725 -0730 109 TOTAL 3,004 'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf I DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 496 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 3,004 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 30,801 Assist 0 TOTAL FLARED VOLUME 34,301 5/8/2008 1:43 PM Flare Start Date 4/1/2008 Flare End Date 4/30/2008 CCP Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF) 08 -148 Ctrld Blowdwn 4/6/2008 12:13:00 AM 12:18:00 AM 5 minutes No No Yes BP1\ATKINSBL 135 Determination Cause T\C 1803 shutdown for planned maintenance and water wash. Action Taken 1803 T/C depressurization completed. 08 -148 Ctrld Blowdwn 4/6/2008 1:42:00 AM 1:47:00 AM 5 minutes No No Yes BP1\ATKINSBL 156 Determination Cause T\C 1810 depressured for water wash Action Taken 1810 T/C depressurization completed. 08 -148 Ctrld Blowdwn 4/6/2008 2:30:00 AM 2:35:00 AM 5 minutes No No Yes BP1\ATKINSBL 14 Determination Cause T\C 1803 spin cooling completed. Action Taken 1803 T/C depressurized and shut down. 08 -148 Ctrld Blowdwn 4/6/2008 4:25:00 AM 4:30:00 AM 5 minutes No No Yes BP1\ATKINSBL 11 Determination Cause T\C 1810 depressured for water wash, spin cool completed. Action Taken 1810 T/C depressurized and shut down. 08 -148 Ctrld Blowdwn 4/6/2008 5:29:00 AM 5:34:00 AM 5 minutes No No Yes BP1\ATKINSBL 141 Determination Cause T\C 1802 shutdown for planned maintenance, OSD and ESD testing. Action Taken 1802 T/C depressurized and shut down. 08 -148 Ctrld Blowdwn 4/6/2008 9:27:00 AM 9:32:00 AM 5 minutes No No Yes BP1\ATKINSBL 14 Determination Cause T/C 1802 shutdown for planned maintance and water wash Action Taken T/C 1802 depressiration complete Generated 5/5/2008 Page 2 of 28 Flare Start Date 4/1/2008 Flare End Date 4/30/2008 CCP Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Bik Smoke Planned Reported By Volume (MSCF) 08 -148 Ctrld Blowdwn 4/6/2008 6:00:00 PM 6:05:00 PM 5 minutes No No Yes BP1\ATKINSBL 51 Determination Cause T\C 1802 shutdown due to control \instrumentation failure associated with valve sequencing during pressurization for water wash. Action Taken T/C 1802 depressurization complete 08 -148 Ctrld Blowdwn 4/6/2008 10:36:00 PM 10:41:00 PM 5 minutes No No Yes BP1\ATKINSBL 14 Determination Cause T\C 1802 shutdown due to a problem associated with IGV servo on turbine. Action Taken 1802 T/C depressurized and shut down. 08 -151 Ctrld Blowdwn 4/7/2008 1:05:00 AM 1:10:00 AM 5 minutes No No Yes BP1\ATKINSBL 135 Determination Cause T\C 1801 depressured for water wash Action Taken 1801 T/C depressurization completed. 08 -151 Ctrld Blowdwn 4/7/2008 1:45:00 PM 1:50:00 PM 5 minutes No No Yes BP1\ATKINSBL 8 Determination Cause Finished water wash, gave T/C a stop. Action Taken T/C 1801 Water wash complete, depressurization complete 08 -151 Ctrld Blowdwn 4/7/2008 3:11:00 PM 3:16:00 PM 5 minutes No No Yes BP1\ATKINSBL 14 Determination Cause T\C 1801 shutdown for unplanned maintenance. Action Taken T/C 1801 depressurization complete Flare Start Date 4/1/2008 Flare End Date 4/30/2008 CCP Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF) 08 -156 Ctrld Blowdwn 4/9/2008 7:22:00 PM 7:27:00 PM 5 minutes No No Yes BP1\ATKINSBL 156 Determination Cause T\C 1812 shut down for spin cooling Action Taken 1812 T/C depressurization completed. 08 -156 Ctrld Blowdwn 4/9/2008 9:23:00 PM 9:28:00 PM 5 minutes No No Yes BP1\ATKINSBL 11 Determination Cause T\C 182 shutdown for planned maintenance, VIGV inspection. Action Taken 1812 T/C depressurized and shut down. 08 -158 Ctrld Blowdwn 4/10/2008 8:35:00 AM 8:40:00 AM 5 minutes Yes No Yes BP1 \STROTHJG 135 Determination Cause T/C 1808 shut down for water wash. Action Taken T/C 1808 spin cooling. 08 -158 Ctrld Blowdwn 4/10/2008 10:00:00 AM 10:05:00 AM 5 minutes Yes No Yes BP1 \STROTHJG 14 Determination Cause T/C 1808 given an ESD from LCR. Action Taken Depressured for water wash. 08 -158 Ctrld Blowdwn 4/10/2008 2:17:00 PM 2:22:00 PM 5 minutes Yes No Yes BP1 \STROTHJG 159 Determination Cause T/C 1811 shut down for water wash . (Val. out of position) Action Taken T/C 1811 spin cooling. Flare Start Date 4/1/2008 Flare End Date 4/30/2008 CCP Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF) 08 -159 Ctrld Blowdwn 4/11/2008 3:23:00 AM 3:28:00 AM 5 minutes No No Yes BP1\ATKINSBL 141 Determination Cause T\C 1807 shutdown for planned maintenance Action Taken 1807 T/C depressurized and shut down. 08 -159 Ctrld Blowdwn 4/11/2008 4:59:00 AM 5:04:00 AM 5 minutes No No Yes BP1\ATKINSBL 14 Determination Cause T\C 1807 shutdown for planned maintenance Action Taken 1807 T/C depressurized and shut down. 08 -159 Ctrld Blowdwn 4/11/2008 10:51:00 AM 10:56:00 AM 5 minutes Yes No Yes BP1\ATKINSBL 93 Determination Cause T/C 1811 given an ESD due to Fl AV bonnet leak. Action Taken Depressured unit for Fl AV bonnet leak. 08 -159 Ctrld Blowdwn 4/11/2008 11:22:00 PM 11:25:00 PM 3 minutes No No Yes BP1\ATKINSBL 93 Determination Cause T\C 1811 depressured after pressure test. Action Taken 1811 T/C depressurization completed. 08 -162 Ctrld Blowdwn 4/12/2008 12:10:00 AM 12:15:00 AM 5 minutes No No Yes BP1\ATKINSBL 8 Determination Cause T\C 1811 shutdown, waiting for starting gas to warm up. Heater went down. Action Taken 1811 T/C depressurization completed. 08 -162 Ctrld Blowdwn 4/12/2008 4:29:00 AM 4:34:00 AM 5 minutes No No Yes BP1\ATKINSBL 156 Determination Cause T\C 1809 shut down for spin cooling Action Taken 1809 TIC depressurization completed. Flare Start Date 4/1/2008 Flare End Date 4/30/2008 CCP Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF) 08 -162 Ctrld Blowdwn 4/12/2008 7:10:00 AM 7:15:00 AM 5 minutes No No Yes BP1\ATKINSBL 8 Determination Cause T/C 1807 depressured for maint.(Starting clucth) Action Taken T/C 1807 depressurization complete. 08 -162 Ctrld Blowdwn 4/12/2008 8:35:00 AM 8:40:00 AM 5 minutes Yes No Yes BP1\ATKINSBL 8 Determination Cause T/C 1809 off spin cool via LCR ESD. Action Taken T/C 1809 depressurization complete. 08 -162 Ctrld Blowdwn 4/12/2008 11:30:00 AM 11:35:00 AM 5 minutes Yes No Yes BP1\ATKINSBL 14 Determination Cause T/C 1806 off spin cool. Action Taken T/C 1806 depressurization complete. 08-167 Ctrld Blowdwn 4/13/2008 3:25:00 AM 3:30:00 AM 5 minutes No No Yes BP1\ATKINSBL 77 Determination Cause T/C 1809 vented down after pressure test on PSV's. Action Taken 1809 T/C depressurization completed. 08 -167 Ctrld Blowdwn 4/13/2008 9:25:00 AM 9:30:00 AM 5 minutes Yes No Yes BP1\ATKINSBL 8 Determination Cause T/C 1806 given a normal stop LCR water wash complete. Action Taken T/C 1806 depressurization complete. 08 -167 Ctrld Blowdwn 4/13/2008 12:55:00 PM 1:00:00 PM 5 minutes Yes No Yes BP1\ATKINSBL 135 Determination Cause T/C 1813 given a normal stop from LCR for water wash. Action Taken T/C 1813 depressurization complete. Flare Start Date 4/1/2008 Flare End Date 4/30/2008 CCP Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF) 08 -167 Ctrld Blowdwn 4/13/2008 8:20:00 PM 8:25:00 PM 5 minutes No No Yes BP1\ATKINSBL 45 Determination Cause T\C 1813 depressured for water wash after pressure test on system Action Taken 1813 T/C depressurization completed. 08 -170 Ctrld Blowdwn 4/14/2008 12:03:00 AM 12:08:00 AM 5 minutes No No Yes BP1\ATKINSBL 135 Determination Cause T\C 1804 depressured for water wash Action Taken 1804 T/C depressurized and shut down. 08 -170 Ctrld Blowdwn 4/14/2008 2:25:00 AM 2:30:00 AM 5 minutes No No Yes BP1\ATKINSBL 14 Determination Cause T\C 1804 shutdown for planned maintenance Action Taken 1804 T/C depressurized and shut down. 08 -170 Ctrld Blowdwn 4/14/2008 7:30:00 PM 7:35:00 PM 5 minutes No No Yes BP1\ATKINSBL 408 Determination Cause T\C 1878 shutdown for planned maintenance and spin cool. Action Taken 1878 T/C depressurization completed. Flare Start Date 4/1/2008 Flare End Date 4/30/2008 CCP Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF) 08 -170 Ctrld Blowdwn 4/14/2008 10:24:00 PM 10:29:00 PM 5 minutes No No Yes BP1\ATKINSBL 152 Determination Cause T\C 1878 shutdown for planned maintenance after spin cool. Action Taken 1878 T/C depressurized and shut down. 08 -175 Ctrld Blowdwn 4/15/2008 7:40:00 PM 7:45:00 PM 5 minutes No No Yes BP1\ATKINSBL 109 Determination Cause T\C 1878 depressured after pressure test. Action Taken 1878 T/C depressurization completed. 08 -175 Ctrld Blowdwn 4/15/2008 9:13:00 PM 9:18:00 PM 5 minutes No No Yes BP1\ATKINSBL 109 Determination Cause T\C 1878 depressured after water wash Action Taken 1878 T/C depressurization completed. 08 -178 Ctrld Blowdwn 4/16/2008 7:25:00 AM 7:30:00 AM 5 minutes Yes No Yes BP1 \STROTHJG 109 Determination Cause T/C 1876 given a normal stop for maint. Action Taken T/C 1876 depressurization complete. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition I 0290000000 PBU CCP /FFGU PBU - BOA BP May - 2008 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. ti. Sold 1,993,683 Pool Name Pool Code Percent 7. Reinjected 190,468,788 PRUDHOE - 640150 100.00% II. Flared or vented 1 hour or less 3,072 — .. 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 31,904 11. Used for lease operations (specify in Remarks) 5,573,778 - 12. Other (see instructions) 0 Authorization >1 hr. MCF Safety 13. TOTAL VOLUME (ITEMS 6-12) 198,071,225 MCF Lease Use 14. NGL Gas Equivalent 0 -MCF Conservation 15. Purchased gas 0 _ _ - Waste: MCF 16. Transferred from: CGF & FS1 198.077,443 Commissioner Date 17. Transferred to: (Express as a negative #) - 6,218 1 18. Remarks: Block 11: Fuel Gas = 5,573,778 mscf and Assist Gas = 0 mscf; Block 17: Fuel Gas to LPC = 6,218 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be Signature � • , ■ A Title Manager, Production Taxes and Royalty _ corrected to pressure of 14.65 psia and to a temperature of 60o F. Printed Name Paul D. Syring Phone (907)564 - 5028 Date '7 � 3 - ( Authority 20 AAC25.235. Form 10-422 Rev. 1/2004 Submit in Duplicate ar -. ' STATE OF ALASKA � x' ' ` KA OIL AND GAS CONSERVATION COMMISSION , . - ' PORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition 0290000000 PBU CCP /FFGU PBU - EOA BP May - 2008 Disposition Volume MCF 20 For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 1,993,683 Pool Name Pool Code Percent 191,958,958 PRUDHOE 640150 100.00% , 7. Reinjected I 8. Flared or vented 1 hour or less 3,072 9. Flared or vented more than 1 hour (see Instr.) 0 10. Pilot and Purge 31,904 i 11. Used for lease operations (specify in Remarks) 4,083,608 Official Use Only 12. Other (see instructions) 0 Authorization >1 hr: MCF Safety 13. TOTAL VOLUME (ITEMS 6 -12) 198,071,225 MCF Lease Use 14 NGL Gas Equivalent 0 MCF Conservation 15 Purchased gas 0 Waste: MCF 16. Transferred from: CGF & FS1 198,077,443 Commissioner Date 17. Transferred to: (Express as a negative #) - 6,218 18. Remarks: Block 11: Fuel Gas = 4,083,608 mscf and Assist Gas = 0 mscf; Block 17: Fuel Gas to LPC = 6,218 mscf I hereby certify that the f. egoing is true and corre t to the best of my knowledge. / Note: All volumes must be � Title Mana Product Taxes and Royalty cor to pressure of 14.65 psia Signature nature and to a temperature of 60o F. Printed Name Berna d W. Hajny Phone (907)564 - 5028 Date ""--/§. --- , e, Authority 20 AAC25.235. Form 10 -422 Rev. 1/2004 Submit in Duplicate � 4 _ BP EXPLORATION (ALASKA) INC. Page 1 PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT May 2008 (Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 5/8/2008 2323 -2355 2,094 Not required for unplanned events which Not required for unplanned events which 5/9/2008 0051 -0056 159 are less than or equal to 1 hour are less than or equal to 1 hour TOTAL 2,253 I Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 5/11/2008 0350 -0355 135 See attachments See attachments 5/11/2008 1549 -1554 408 5/15/2008 0947 -0952 135 5/17/2008 1545 -1550 135 5/17/2008 1555 -1600 6 TOTAL 819 !Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 2,253 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 819 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 31,904 Assist 0 TOTAL FLARED VOLUME 34,976 6/10/2008 1:46 PM Flare Start Date 5/1/2008 Flare End Date 5/31/2008 CCP Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF) 08 -228 Ctrld Blowdwn 5/11/2008 3:50:00 AM 3:55:00 AM 5 minutes No No Yes BP1 \SMITOR 135 Determination Cause Shut -Down T/C 1803 for maint. Action Taken System depressured 08 -228 Ctrld Blowdwn 5/11/2008 3:49:00 PM 3:54:00 PM 5 minutes Yes No Yes BP1 \SMITOR 408 Determination Cause T/C 1876 S/D for maint. Action Taken T/C 1876 depressurization complete. 08 -236 Ctrld Blowdwn 5/15/2008 9:47:00 AM 9:52:00 AM 5 minutes No No Yes BP1 \BAKERWF 135 Determination Cause T\C 1801 shutdown for planned maintenance Action Taken 1801 T/C depressurization completed. 08 -241 Ctrld Blowdwn 5/17/2008 3:45:00 PM 3:50:00 PM 5 minutes No No Yes BP1 \BAKERWF 135 Determination Cause T\C 1801 shutdown (Normal Stop) due to a problem associated with a gas leak up stream of P55 -ASV. Action Taken 1801 T/C depressurization completed. 08 -241 Ctrld Blowdwn 5/17/2008 3:55:00 PM 4:00:00 PM 5 minutes No No Yes BP1 \BAKERWF 6 Determination Cause ESD'd T\C 1801 from LCR to vent unit to "0" psi. Action Taken 1801 T/C depressurization completed. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1, Facility Number 2 Facility Name 3. Field 4. Operator 5. Month/Year of Disposition 0290000000 PBU CCP/FFGU PBU - EOA BP June Disposition Volume MCF 20. For production from multiple pools. list contribution of each pool as a percent of Total Volume, 6. Sold 1,383,005 Pool Name Pool Code Percent 7 Reinjected 179,132,316 - PRUDHOE 640150 100.00%, 8 Flared or vented 1 hour or less 0 . 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 32,037 — , 11. Used for tease operations (specify in Remarks) 5,458,856 12. Other (see Instructions) 0 Authorization >1 tr. IMCF Safety 13. TOTAL VOLUME (ITEMS 6 186,006,214 ' MCF . Lease Use 14. NGL Gas Equivalent 0 MCF — Conservation 15. Purchased gas 0 Waste: MGF 16. Transferred from: CGF & FS1 186,058,817 Commissioner Date 17 Transferred to: (Express as a negative #) - 52,603 , 18. Remarks: Block 11: Fuel Gas = 5,458,856 mscf and Assist Gas = 0 mscf; Block 17: Fuel Gas to LPC = 52,603 mscf I hereby certify that the foregoing Is true and correct to me best of my knowledge. _ Note: All volumes must be Signature A do __ . A._„, ..._...„,,,, 4 'nee Manager, Production Taxes and Royalty corrected to pressure of 14.65 psla and to a temperature of 60o F. Printed Name Paul D. Swing Phone (907)564 Date ) — 1 • 1 0 Authority 20 AAC25.235. Form 10-422 Rev. 1/2004 Submit in Duplicate + - - S U P E 7 . . k + STATE OF ALAS - ::, ALASKA OIL AND GAS CONSE RVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition 0290000000 PBU CCP /FFGU PBU - EOA BP June -2008 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 1,383,005 Pool Name Pool Code Percent 7. Reinjected 180,574,456 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 32,037 11. Used for lease operations (specify in Remarks) 4,016,716 12. Other (see Instructions) 0 Offici01, -,0 „OnIY,.. - „ . Authorization >1 hr: MCF Safety 13. TOTAL VOLUME (ITEMS 6-12) 186,006,214 MCF Lease Use 14. NGL Gas Equivalent 0 MCF Conservation 15. Purchased gas 0 Waste: MCF 16. Transferred from: CGF & FS1 186,058,817 Commissioner Date 17. Transferred to: (Express as a negative #) - 52,603 18. Remarks: Block 11: Fuel Gas = 4,016,716 mscf and Assist Gas = 0 mscf; Block 17: Fuel Gas to LPC = 52,603 mscf I hereby certify that the oregoing is a correct to the best of my knowledge. Note: All volumes must be Signature Title Manager, Production Taxes and Royalty corrected to pressure of 14.65 psia "Li y � and to a temperature of 60o F. ® Printed Name Bern rd W. Hajny Phone (907)564 -5028 Date / 7 6) Se Authority 20 AAC25.235. Form 10 -422 Rev. 1/2004 Submit in Duplicate BP EXPLORATION (ALASKA) INC. Page 1 PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT June 2008 Unplanned Events less than or e• ual to 1 hour DATE fl VOL „ gi!' &CAUSE • ACTION TAKEN TO ELBA INATE CAUSE Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour TOTAL 0 Unplanned Events • reater than 1 hour ::;ACTICNTAKENTOEUMiNATECAUSE • • See attachments See attachments TOTAL 0 Planned Events Less Than or Equal 1 Hour AND Not Exceedin ! 5000 Mcf DATE TME VO UME DESCRIPTION OF INC IDENT & ” ACTIONTAKENTO'ELIMMATE CAUSE CAUSE See attachments See attachments TOTAL 0 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME OLUME DESCR�'flON OF INCJDENT & CAUSE ACTI ' N TAKEN TO EUMINATE CAUSE See attachments See attachments TOTAL 0 Unplanned Events < 1 Hour 0 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME 32,037 7/14/2008 5:48 PM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1, Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition 0290000000 PBU CCP /FFGU PBU - EOA BP Ally-2008 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume, 6. Sold 1,610,489 Pool Name Pool Code Percent 7. Reinjected 168,277,356 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 1,596 13. Flared or vented more than 1 hour (see inst.) 0 10 Pilot and Purge 32,838 11. Used for lease operations (specify in Remarks) 5,433,575 - Official Use Only- 12. Other (see instructions) 0 Authorization >1 he MCF Safety 13. TOTAL VOLUME (ITEMS 6 -12) 175,355,854 MCF Lease Use 14. NGL Gas Equivalent 0 MCF Conservation 15. Purchased gas 0 Waste: MCF 16. Transferred from: CGF & FS1 175,355,854 Commissioner Date 17. Transferred to: (Express as a negative #) 0 18. Remarks: Block 11: Fuel Gas = 5.433,575 mscf and Assist Gas = 0 mscf; Block 17: Fuel Gas to LPC = 0 mscf 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be Signature x rule M anager, Production Taxes and Royalty corrected to pressure of 14.65 psia and to a temperature of 60o F. Printed Name Paul D. Syring Phone (907)564 -5028 Date "` 3 Authority 20 AAC25.235, Form 10-422 Rev. 1/2004 Submit in Duplicate nr Surc ED + _� `,� STATE OF ALAS 'ASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition 0290000000 PBU CCP /FFGU PBU - EOA BP July -2008 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 1,610,489 Pool Name Pool Code Percent 7. Reinjected 169,639,436 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 1,596 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 32,838 11. Used for lease operations (specify in Remarks) 4,071,495 - Official Use Only 12. Other (see instructions) 0 Authorization >1 hr: MCF Safety 13. TOTAL VOLUME (ITEMS 6 -12) 175,355,854 MCF Lease Use 14. NGL Gas Equivalent 0 MCF Conservation 15. Purchased gas 0 Waste: MCF 16. Transferred from: CGF & FS1 175,355,854 17. Transferred to: (Express as a negative #) 0 Commissioner Date 18. Remarks: Block 11: Fuel Gas = 4,071,495 mscf and Assist Gas = 0 mscf; Block 17: Fuel Gas to LPC = 0 mscf I hereby certify that the oregoing is a an rrect to the best of my knowledge. Note: All volumes must be Signature Title Manager, Production Taxes and Royalty corrected to pressure of 14.65 psis and to a temperature of 60o F. Printed Name Befna d W. Hajny Phone (907)564 -5028 Date / e A uthor i ty 20 AAC Form 10 -422 Rev. 1/2004 Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT Page 1 July 2008 l Unylanned Events less than Or equal to 1 hour DATE " TIME - VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 7/3/2008 1920-1925 135 Not required for unplanned events which Not required for unplanned events which 7/7/2008 1535-1538 8 are less than or equal to 1 hour are less than or equal to 1 hour TOTAL 143 !Unplanned Events greater than 1 hour DATE TIME VOLUME DpsmipTioN OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION INCIDENT &CAUSE ACTION TAKEN TO ELIMINATE CAUSE 7/1/2008 1020-1025 135 See attachments See attachments 7/1/2008 2000-2005 135 7/2/2008 0057-0102 6 7/24/2008 0500-0505 408 7/24/2008 0835-0840 109 7/24/2008 1623-1628 109 7/24/2008 1925-1930 408 7/30/2008 000170006 • 135 7/31/2008 1638-1643 8 TOTAL 1,453 11 Events Exceedii*FHPUr OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 143 Unplanned Events > 1 Hour Planned Events < 1 hour and not 1,453 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME 34,434 8/13/2008 1:42 PM Flare Start Date 7/1/2008 Flare End Date 7/31/2008 CCP Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Bik Smoke Planned Reported By Volume (MSCF) 08 -314 Ctrld Blowdwn 7/1/2008 10:20:00 AM 10:25:00 AM 5 minutes No No Yes BP1 \ERHARTRD 135 Determination Cause T\C 1805 shutdown for planned maintenance Action Taken Depressurization complete 08 -314 Ctrld Blowdwn 7/1/2008 8:00:00 PM 8:05:00 PM 5 minutes No No Yes BP1 \ERHARTRD 135 Determination Cause T\C 1808 shutdown for unplanned maintenance on F67AV Action Taken T/C 1808 depressured 08 -316 Ctrld Blowdwn 7/2/2008 12:57:00 AM 1:02:00 AM 5 minutes No No Yes BP1 \SANFORSH 6 Determination Cause Depressuring T/C 1805 to 0 psig Action Taken T/C 1805 depressured 08 -352 Ctrld Blowdwn 7/24/2008 5:00:00 AM 5:05:00 AM 5 minutes No No Yes BP1 \TURNERG2 408 Determination Cause T\C 1876 shutdown for planned maintenance. To do repair work on F -426 valve Action Taken T/C 1876 was depressured down to 50 PSI 08 -352 Ctrld Blowdwn 7/24/2008 8:35:00 AM 8:40:00 AM 5 minutes No No Yes BP1 \TURNERG2 109 Determination Cause T\C 1876 spin cooling complete. Prep for maintenance. Action Taken 1876 T/C depressurized and shut down. 08 -352 Ctrld Blowdwn 7/24/2008 4:23:00 PM 4:28:00 PM 5 minutes No No Yes BP1 \TURNERG2 109 Determination Cause T\C 1876 depressured after water wash. To install inlet air house doors roll fuel gas blind and prep for start up. Action Taken 1876 T/C depressurization completed. 08 -352 Ctrld Blowdwn 7/24/2008 7:25:00 PM 7:30:00 PM 5 minutes No No Yes BP1 \TURNERG2 408 Determination Cause T/C 1876 Was shut down from idle, to try and "free up" the 2nd stage nozzles Action Taken T/C 1876 was depressured down to 50 PSI Flare Start Date 7/1/2008 Flare End Date 7/31/2008 CCP Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF) 08 -365 Ctrld Blowdwn 7/30/2008 12:01:00 AM 12:06:00 AM 5 minutes No No Yes BP1 \BOWENJW 135 Determination Cause T /C1808 shut Down for planned maintance. Action Taken T/C 1808 depressure Complete 08 -369 Ctrld Blowdwn 7/31/2008 4:38:00 PM 4:43:00 PM 5 minutes No No Yes BP1 \BRECKSRD 8 Determination Cause T\C 1808 depressured after water wash. Action Taken 1808 T/C depressurization completed. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1, Facility Number .2. Facility Name `3. Field 4. Operator r, 5. Month/Year of Disposition 0290000000 ,PBU CCP /FFGU PBU - EOA _BP August -2008 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 1,715,413 Pool Name Pool Code Percent 7. Reinjected 143,797,877 PRUDHOE 640150 _ 100.000/0 8. Flared or vented 1 hour or less 2,783 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 28,954 °— it Used for lease operations (specify in Remarks) 4,567,930 L t7f lafUse Only * . 12. Other (see instructions) 0 authorization >1 hr. MCF Safety 13. TOTAL VOLUME (ITEMS 6 -12) 150,112,957 MCF Lease Use 14. NGL Gas Equivalent 0 MCF Conservation 15. Purchased gas 0 Waste: MCF 16. Transferred from: CGF & FS1 150,136,442 Commissioner Date 17. Transferred to: (Express as a negative #) - 23,485 18. Remarks: Block 11: Fuel Gas = 4,567,930 mscf and Assist Gas = 0 mscf; Block 17: Fuel Gas to LPC = 23,485 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be . Signature + „ + ,.....1 4 . 4 „. A , I , ; Title Manager, Production Taxes and Royalty corrected to pressure of 14.65 psis and to a temperature of 60o F. Printed Name Paul D. Syring Phone (907)564 -5028 Date' ^ 3 .- 1. 0 Authority 20 AAC25.235. Form 10 -422 Rev. 1/2004 Submit in Duplicate , r ' STATE OF ALASKA ;0` 4_.t :4. ASKA OIL AND GAS CONSERVATION COMMISSION `' L - '" - REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4. Operator 5. MonthA'ear of Disposition 0290000000 PBU CCP /FFGU PBU - EOA BP August - 2008 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 1,715,413 Pool Name Pool Code Percent 7. Reinjected 145,074,927 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 2,783 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 28,954 11. Used for lease operations (specify in Remarks) 3,290,880 7 0tl 16u e 12. Other (see instructions) 0 Authorization >1 hr: MCF Safety 13. TOTAL VOLUME (ITEMS 6 -12) 150,112,957 MCF Lease Use 14. NGL Gas Equivalent 0 MCF Conservation 15. Purchased gas 0 Waste: MCF 16. Transferred from: CGF & FS1 150,136,442 Commissioner Date 17. Transferred to: (Express as a negative #) - 23,485 18. Remarks: Block 11: Fuel Gas = 3,290,880 mscf and Assist Gas = 0 mscf; Block 17: Fuel Gas to LPC = 23,485 mscf I hereby certify th t the foregoing is true and correct to the best of my knowledge. / Note: All volumes must be Signature Title M anager, Production Taxes and Ro alty c orrected to pressure of 14.65 psia � and to a tem of 600 F. Printed Name Bernard . Hajny Phone (907)564 -5028 Date ( (`''( A uthority 20 AAC25.235. Form 10 -422 Rev. 1/2004 Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT Page 1 August 2008 'Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 8/10/2008 2035 -2040 51 Not required for unplanned events which Not required for unplanned events which 8/11/2008 0830 -0835 109 are less than or equal to 1 hour are Tess than or equal to 1 hour 8/24/2008 1632 -1637 135 8/24/2008 1955 -2000 135 8/24/2008 2035 -2040 135 TOTAL 565 'Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 8/2/2008 0436 -0441 408 See attachments See attachments 8/2/2008 1010 -1015 152 8/8/2008 1915 -1920 141 8/10/2008 1746 -1751 135 8/11/2008 1637 -1642 135 8/15/2008 2142 -2147 159 8/15/2008 2150 -2155 159 8/16/2008 0200 -0300 250 8/16/2008 1925 -1931 159 8/16/2008 2251 -2256 32 8/17/2008 1720 -1725 35 8/17/2008 1740 -1745 91 8/17/2008 1915 -1920 91 8/20/2008 2128 -2133 159 8/21/2008 0050 -0055 11 8/21/2008 0520 -0525 3 8/21/2008 1550 -1555 90 8/21/2008 1645 -1647 8 TOTAL 2,218 9/9/2008 2:48 PM BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT Page 2 August 2008 (Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 565 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 2,218 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 28,954 Assist 0 TOTAL FLARED VOLUME 31,737 II 9/9/2008 2:48 PM • Flare Start Date 8/1/2008 Flare End Date 8/31/2008 CCP Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF) 08 -372 Ctrld Blowdwn 8/2/2008 4:36:00 AM 4:41:00 AM 5 minutes No No Yes BP1 \SMITOR 408 Determination Cause INC 1878 shutdown for planned maintenance Action Taken 1878 T/C depressurization completed. 08 -372 Ctrld Blowdwn 8/2/2008 10:10:00 AM 10:15:00 AM 5 minutes No No Yes BP1 \SMITOR 152 Determination Cause T\C 1878 shutdown after spin cool. Action Taken 1878 T/C depressurization completed. 08 -388 Ctrld Blowdwn 8/8/2008 7:15:00 PM 7:20:00 PM 5 minutes No No Yes BP1 \BAKERWF 141 Determination Cause T\C 1801 depressured for water wash Action Taken 1801 T/C depressurized and shut down. 08 -390 Flare Relief 8/10/2008 5:46:00 PM 5:51:00 PM 5 minutes No No Yes BP1 \STROTHJG 135 Determination Cause T\C 1806 depressured for water wash Action Taken 1806 T/C depressurization completed. 08 -392 Flare Relief 8/11/2008 4:37:00 PM 4:42:00 PM 5 minutes No No Yes BP1 \STROTHJG 135 Determination Cause T/C 1804 given a stop from LCR for water wash /Maint. Action Taken T/C 1804 depressurization complete. 08 -401 Flare Relief 8/15/2008 9:42:00 PM 9:47:00 PM 5 minutes No No Yes BP1\BAKERWF 159 Determination Cause T\C 1812 shutdown for planned maintenance Action Taken 1812 T/C depressurized and shut down. Flare Start Date 8/1/2008 Flare End Date 8/31/2008 CCP Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF) 08 -401 Flare Relief 8/15/2008 9:50:00 PM 9:55:00 PM 5 minutes No No Yes BP1 \BAKERWF 159 Determination Cause T\C 1810 shutdown for planned maintenance/ TAPS Action Taken 1810 T/C depressurized and shut down. 08 -400 Ctrld Blowdwn 8/16/2008 2:00:00 AM 3:00:00 AM 60 minutes No No Yes BP1 \BAKERWF 250 Determination Cause Depressured NGI lines for maintenance Action Taken Depressurization complete 08 -400 Flare Relief 8/16/2008 7:25:00 PM 7:31:00 PM 6 minutes No No Yes BP1 \BAKERWF 159 Determination Cause T\C 1811 shutdown for planned maintenance Action Taken T/C 1811 depressurization completed 08 -400 Flare Relief 8/16/2008 10:51:00 PM 10:56:00 PM 5 minutes No No Yes BP1 \BAKERWF 32 Determination Cause T/C 1812 depressured for water wash after valve sequence Action Taken T/C 1812 depressurization complete 08 -407 Flare Relief 8/17/2008 5:20:00 PM 5:25:00 PM 5 minutes No No Yes BP1 \ERHARTRD 35 Determination Cause T\C 1812 shutdown for planned maintenance Action Taken T/C 1812 depressurization complete 08 -407 Flare Relief 8/17/2008 5:40:00 PM 5:45:00 PM 5 minutes No No Yes BP1 \ERHARTRD 91 Determination Cause T\C 1812 shutdown for planned maintenance Action Taken T/C 1812 depressurization complete Flare Start Date 8/1/2008 Flare End Date 8/31/2008 CCP Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF) 08 -407 Flare Relief 8/17/2008 7:15:00 PM 7:20:00 PM 5 minutes No No Yes BP1 \ERHARTRD 91 Determination Cause T\C 1812 shutdown due to control\instrumentation failure associated with a start up Action Taken T/C 1812 depressurization complete and ready for restart 08 -417 Flare Relief 8/20/2008 9:28:00 PM 9:33:00 PM 5 minutes No No Yes BP1 \ERHARTRD 159 Determination Cause T/C 1809 depressured for maintenance Action Taken T/C 1809 depressurization completed 08 -418 Flare Relief 8/21/2008 12:50:00 AM 12:55:00 AM 5 minutes No No Yes BP1 \ERHARTRD 11 Determination Cause T/C 1809 depressured for maintenance Action Taken T/C depressurization completed 08 -418 Flare Relief 8/21/2008 5:20:00 AM 5:25:00 AM 5 minutes No No Yes BP1 \ERHARTRD 3 Determination Cause T/C 1809 depressured for maintenance Action Taken T/C 1809 depressurization complete 08 -418 Flare Relief 8/21/2008 3:50:00 PM 3:55:00 PM 5 minutes No No Yes BP1 \ERHARTRD 90 Determination Cause Vented T/C 1809 down after pressuer test Action Taken Depressured T/C 1809 down from 1400 to 175 PSI 08 -418 Flare Relief 8/21/2008 4:45:00 PM 4:47:00 PM 2 minutes No No Yes BP1 \ERHARTRD 8 Determination Cause T\C 1809 shutdown for unplanned maintenance Action Taken 1809 T/C depressurization completed. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition 0290000000 PBU CCP!FFGU PBU - EOA `BP September - 2008 Disposition Volume MCF 20. For production from multiple pools. list contribution of each pool as a percent of Total Volume. 6. Sold 1,800,232 Pool Name Pool Code Percent 7. Reinjected 188,126,926 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 466 9, Flared or vented more than 1 hour (see inst.) 0 10. Pilot and Purge 28,020 . -- Used for lease operations (specify in Remarks) 5,486,998 - , VI. 12. Other (seelnstructions) 0 Authorization >1 hr. MCF Safety 13. TOTAL VOLUME (ITEMS 6-12) 195,442,642 MCF Lease Use 14. NGL Gas Equivalent 0 MCF Conservation 15. Purchased gas 0 Waste: MCF 16. Transferred from; CGF & FS1 195,575,105 Commissioner Date 17. Transferred to: (Express as a negative #) - 132,463 18. Remarks: Block 11: Fuel Gas = 5,486,998 mscf and Assist Gas = 0 mscf Block 17: Fuel Gas to LPC = 132,463 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: Ali volumes must be Signature A a . ,C Title Manager, Production Taxes and Royalty corrected to pressure of 14.65 psia and to a temperature of 600 F. Printed Name Paul D. Syritig Phone (907)564.5028 Date 1 -3 — i 0 Authority 20 AAC25.235. Form 10-422 Rev. 1/2004 Submit in Duplicate „v 4 supp [r] STATE OF ALASKA ,_ Frl ....-4. -- ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition 0290000000 PBU CCP /FFGU PBU - EOA BP September - 2008 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 1,800,232 Pool Name Pool Code Percent 7. Reinjected 189,566,136 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 466 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 28,020 11. Used for lease operations (specify in Remarks) 4,047,788 - 12. Other (see instructions) 0 Authorization >1 hr: MCF Safety 13. TOTAL VOLUME (ITEMS 6 -12) 195,442,642 MCF Lease Use 14. NGL Gas Equivalent 0 MCF Conservation 15. Purchased gas 0 Waste: MCF 16. Transferred from: CGF & FS1 195,575,105 Commissioner Date 17. Transferred to: (Express as a negative #) - 132,463 18. Remarks: Block 11: Fuel Gas = 4,047,788 mscf and Assist Gas = 0 mscf; Block 17: Fuel Gas to LPC = 132,463 mscf I hereby certi that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be Signature Title Manager, Production Taxes and Royalty corrected to pressure of 14.65 psia and to a temperature of 60o F. Printed Name Paul D. Syring Phone (907)564 -5028 Date Icy r /0 � Authority 20 AAC25.235. Form 10 -422 Rev. 1/2004 Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT Page 1 September 2008 'Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 9/2/2008 1513 -1518 8 Not required for unplanned events which Not required for unplanned events which 9/29/2008 0310 -0315 8 are less than or equal to 1 hour are Tess than or equal to 1 hour 9/29/2008 0415 -0420 135 9/29/2008 1230 -1235 135 TOTAL 286 Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 (Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INC IDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 9/2/2008 1432 -1437 45 See attachments See attachments 9/26/2008 0730 -0735 135 TOTAL 180 'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 286 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 180 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 28,020 Assist , 0 TOTAL FLARED VOLUME 28,486 10/8/2008 10:49 AM Flare Start Date 9/1/2008 Flare End Date 9/30/2008 CCP Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF) 08 -439 Flare Relief 9/2/2008 2:32:00 PM 2:37:00 PM 5 minutes No No Yes BP1 \STROTHJG 45 Determination Cause T/C 1804 depressure after pressure test. Action Taken T/C 1804 depressurization completed. 08 -467 Flare Relief 9/26/2008 7:30:00 AM 7:35:00 AM 5 minutes No No Yes BP1 \TURNERG2 135 Determination Cause T\C 1801 depressured for water wash and spin cool. Action Taken 1801 T/C depressurization completed. it • STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition 0290000000 PBU CCP /FFGU PBU - EOA BP October -2008 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 1,888,355 Pool Name Pool Code Percent 7. Reinjected 208,895,985 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 3,365 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 33,635 11. Used for lease operations (specify in Remarks) 5,753,715 12. Other (see instructions) 0 Authorization >1 hr: MCF Safety 13. TOTAL VOLUME (ITEMS 6 -12) 216,575,055 MCF Lease Use 14. NGL Gas Equivalent 0 MCF Conservation 15. Purchased gas 0 Waste: MCF 16. Transferred from: CGF & FS1 216,631,490 Commissioner Date 17. Transferred to: (Express as a negative #) -56,435 18. Remarks: Block 11: Fuel Gas = 5,753,715 mscf and Assist Gas = 0 mscf; Block 17: Fuel Gas to LPC = 56,435 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be Signature " _ Title Manager, Production Taxes and Royalty corrected to pressure of 14.65 psia and to a temperature of 600 F. Printed Name Paul D. Syring Phone (907)564 -5028 Date k\ \ \� \v Authority 20 AAC25.235. Form 10 -422 Rev. 1/2004 Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT Page 1 October 2008 'Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 10/24/2008 0139 -0144 45 Not required for unplanned events which Not required for unplanned events which 10/24/2008 0750 -0755 156 are less than or equal to 1 hour are less than or equal to 1 hour 10/24/2008 2218 -2223 156 10/25/2008 0705 -0710 135 TOTAL 492 "Unplanned Events greater than 1 hour DATE TIME . VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 "Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE .. 10/22/2008 0035 -0040 135 See attachments See attachments 10/22/2008 0052 -0057 156 10/22/2008 0136 -0141 135 10/22/2008 0237 -0242 35 10/22/2008 0405 -0410 14 10/23/2008 0133 -0138 135 10/23/2008 0444 -0449 8 10/23/2008 0930 -0935 32 10/23/2008 1256 -1301 156 10/23/2008 1432 -1437 11 10/23/2008 1855 -1900 135 10/23/2008 2045 -2050 14 10/24/2008 0502 -0507 135 10/24/2008 0947 -0952 91 10/24/2008 1425 -1430 111 10/25/2008 0353 -0358 156 10/25/2008 0855 -0900 14 10/25/2008 1517 -1522 156 10/25/2008 1714 -1719 80 10/26/2008 1859 -1904 14 10/27/2008 0726 -0731 408 11/11/2008 10/27/2008 1005 -1010 152 10:16 AM BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT Page 2 October 2008 10/28/2008 0730 -0735 236 10/29/2008 1515 -1520 11 10/29/2008 1640 -1645 8 10/29/2008 2130 -2145 135 10/29/2008 2350 -2355 51 10/30/2008 2115 -2120 8 10/30/2008 2330 -2345 141 TOTAL 2,873 (Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 TOTAL. Unplanned Events < 1 Hour 492 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 2,873 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 33,635 Assist TOTAL FLARED VOLUME 37,000 11/11/2008 10:16 AM Flare Start Date 10/1/2008 Flare End Date 10/31/2008 CCP Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF) 08 -537 Flare Relief 10/22/2008 12:35:00 AM 12:40:00 AM 5 minutes No No Yes BP1 \TURNERG2 135 Determination Cause T\C 1805 depressured for water wash, ratchet cooling. Action Taken 1805 T/C depressurized complete, unit ratchet cooling. 08 -537 Flare Relief 10/22/2008 12:52:00 AM 12:57:00 AM 5 minutes No No Yes BP1 \TURNERG2 156 Determination Cause T\C 1811 shut down to spin cool in preparation of water wash and maintenance. Action Taken 1811 T/C depressurization completed. 08 -537 Flare Relief 10/22/2008 1:36:00 AM 1:41:00 AM 5 minutes No No Yes BP1 \TURNERG2 135 Determination Cause T\C 1808 depressured for water wash and ratchet cooling. Action Taken 1808 T/C depressurization completed, unit ratchet cooling. 08 -537 Flare Relief 10/22/2008 2:37:00 AM 2:42:00 AM 5 minutes No No Yes BP1 \TURNERG2 35 Determination Cause T\C 1811 spin cooling complete, unit depressured and shut down for maintenance and water wash. Action Taken 1811 T/C depressurized and shut down. 08 -537 Flare Relief 10/22/2008 4:05:00 AM 4:10:00 AM 5 minutes No No Yes BP1 \TURNERG2 14 Determination Cause T\C 1808 spin cooling complete, unit shut down for maintenance and water wash. Action Taken 1808 T/C depressurized and shut down. ill Flare Start Date 10/1/2008 Flare End Date 10/31/2008 CCP Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF) 08 -539 Flare Relief 10/23/2008 1:33:00 AM 1:38:00 AM 5 minutes No No Yes BP1 \SMITOR 135 Determination Cause Shut down T/C 1801 for water wash Action Taken depressured system 08 -539 Flare Relief 10/23/2008 4:44:00 AM 4:49:00 AM 5 minutes No No Yes BP1 \SMITOR 8 Determination Cause Shut -Down T/C 1801 after spin cooling for water wash Action Taken system depressured 08 -539 Flare Relief 10/23/2008 9:30:00 AM 9:35:00 AM 5 minutes Yes No Yes BP1 \SMITOR 32 Determination Cause T/C 1811 tripped. Action Taken T/C 1811 depressuriztion complete. 08 -539 Flare Relief 10/23/2008 12:56:00 PM 1:01:00 PM 5 minutes Yes No Yes BP1 \SMITOR 156 Determination Cause T/C 1809 shut down for water wash. Action Taken T/C 1809 depressurization complete. 08 -539 Flare Relief 10/23/2008 2:32:00 PM 2:37:00 PM 5 minutes Yes No Yes BP1 \SMITOR 11 Determination Cause T/C 1809 spin cool complete. Action Taken T/C 1809 depressurization complete. 08 -539 Flare Relief 10/23/2008 6:55:00 PM 7:00:00 PM 5 minutes No No Yes BP1 \SMITOR 135 Determination Cause shut -down T/C 1802 for spin cool to water wash Action Taken system dpressured 08 -539 Flare Relief 10/23/2008 8:45:00 PM 8:50:00 PM 5 minutes No No Yes BP1 \SMITOR 14 Determination Cause Shut -down (ESD) T/C 1802 after spin cool for water wash Action Taken depressured system Flare Start Date 10/1/2008 Flare End Date 10/31/2008 CCP Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF) 08 -540 Flare Relief 10/24/2008 5:02:00 AM 5:07:00 AM 5 minutes No No Yes BP1 \SMITOR 135 Determination Cause Shut -Down T/C 1804 for waterwash Action Taken system depressured 08 -540 Flare Relief 10/24/2008 9:47:00 AM 9:52:00 AM 5 minutes Yes No Yes BP1 \SMITOR 91 Determination Cause T/C 1810 off spin cool. Action Taken T/C 1810 depresserization complete. 08 -540 Flare Relief 10/24/2008 2:25:00 PM 2:30:00 PM 5 minutes Yes No Yes BP1 \SMITOR 111 Determination Cause T/C 1809 pressure testing complete after maint. Stop given. Action Taken T/C 1809 depressurization complete. 08 -544 Flare Relief 10/25/2008 3:53:00 AM 3:58:00 AM 5 minutes No No Yes BP1 \SMITOR 156 Determination Cause Shut -Down T/C 1809 for maint. Action Taken system depressured Flare Start Date 10/1/2008 Flare End Date 10/31/2008 CCP Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF) 08 -544 Flare Relief 10/25/2008 8:55:00 AM 9:00:00 AM 5 minutes Yes No Yes BP1 \SMITOR 14 Determination Cause T/C 1807 off of spin cool. Action Taken T/C 1807 depressurization complete. 08 -544 Flare Relief 10/25/2008 3:17:00 PM 3:22:00 PM 5 minutes Yes No Yes BP1 \SMITOR 156 Determination Cause T/C 1812 shut down for water wash. Action Taken T/C 1812 depressurization complete. 08 -544 Flare Relief 10/25/2008 5:14:00 PM 5:19:00 PM 5 minutes Yes No Yes BP1 \SMITOR 80 Determination Cause T/C 1812 of spin cool. Action Taken T/C 1812 depressurization complete. 08 -548 Flare Relief 10/26/2008 6:59:00 PM 7:04:00 PM 5 minutes No No Yes BP1 \SMITOR 14 Determination Cause Dpressure T/C 1804 for maint. Unit already off line Action Taken system depressured 08 -552 Flare Relief 10/27/2008 7:26:00 AM 7:31:00 AM 5 minutes Yes No Yes BP1 \STROTHJG 408 Determination Cause T/C 1878 shut for maint. /waterwash. Action Taken T/C 1878 depressurization complete. • Flare Start Date 10/1/2008 Flare End Date 10/31/2008 CCP Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF) 08 -552 Flare Relief 10/27/2008 10:05:00 AM 10:10:00 AM 5 minutes Yes No Yes BP1 \STROTHJG 152 Determination Cause T/C 1878 off spin cool. Action Taken T/C 1878 depressurization complete. 08 -554 Flare Relief 10/28/2008 7:30:00 AM 7:35:00 AM 5 minutes No No Yes BP1 \STROTHJG 236 Determination Cause T/C 1809 shut down ( Normal them ESD) due to PSV maint. Action Taken T/C 1809 shut down ( Normal them ESD) depressurization complete. 08 -558 Flare Relief 10/29/2008 3:15:00 PM 3:20:00 PM 5 minutes No No Yes BP1\BAKERWF 11 Determination Cause T\C 1804 pressure testing new valve. Action Taken 1804 T/C depressurization completed. 08 -558 Flare Relief 10/29/2008 4:40:00 PM 4:45:00 PM 5 minutes No No Yes BP1\BAKERWF 8 Determination Cause T/C 1804 depressured after water wash. Action Taken 1804 T/C depressurization completed. 08 -558 Flare Relief 10/29/2008 9:30:00 PM 9:45:00 PM 15 minutes No No Yes BP1 \BAKERWF 135 Determination Cause 1806 S/D to spin cool for water wash Action Taken Depressure completed 08 -558 Flare Relief 10/29/2008 11:50:00 PM 11:55:00 PM 5 minutes No No Yes BP1\BAKERWF 51 Determination Cause 1806 spin cool S/D Action Taken depressure complete Flare Start Date 10/1/2008 Flare End Date 10/31/2008 CCP Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF) 08 -560 Flare Relief 10/30/2008 9:15:00 PM 9:20:00 PM 5 minutes No No Yes BP1 \PENNYSD 8 Determination Cause 1806 vented down after pressure test Action Taken depressure complete 08 -560 Flare Relief 10/30/2008 11:30:00 PM 11:45:00 PM 15 minutes No No Yes BP1 \PENNYSD 141 Determination Cause 1803 S/D to spin cool for water wash Action Taken depressure complete STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2, Facility Name 3. Field if 1. Operator 5. Month/Year of Disposition 0290000000 _PBU CCP/FFGU PBU - EOA BP November-2008 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 1,956,577 Pool Name Pool Code Percent 7, Reinjected 217,050,802 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 1,027 9. Flared or vented more than 1 hour (see Instr.) 0 -1C mn" and Purge 32,439 I ...._ I I (specify in Remarks) 5,937,504 11- ot- fvi •'01s' 0 Authorization >1 hr: MCF --,-- - - — Safety •I'', T<' : v, vOLUME (1TEMS41-12) 224,978,349 MCF : -- — -- — Lease Use ": -alep 0 MCF Conservation 0 Waste: MCF - - - Pd fift in 7,7 `:, -,:,, i 224,978,349 .....„....._ _. ...... Commissioner Date n4clattivP $,) 0 -- ;sks: b ock li17,7ae G'ag 5.937,504 mscf and Assist Gas =0 mscf; Block 17: Fuel Gas to LPC =0 mscf i i r i certify that the foregoing is true and correct to the best of my knowledge. -,z- ris411611L.._ Note: All volumes must be Signature Title Manager, Production Taxes and Royalty corrected to pressure of 14.65 pia —...._ / - and to a temperature of 60o F. s'-inted Nernf Paul D. S y rin g L j.... I aj12IDISLAI,thQjjjY2QMGK215hone (907)564-5028 Date Form 10-422 Rev, 1f2004 Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT Page 1 November 2008 Un • lanned Events less than or e • ual to 1 hour US . CThNTA TOEL M A SE 11/1/2008 0855-0900 156 Not required for unplanned events which Not required for unplanned events which 11/7/2008 1459-1504 77 are less than or equal to 1 hour are less than or equal to 1 hour TOTAL 233 Un • lanned Events • reater than 1 hour ' AT TIME LUME O OFN D • : &CA • A V PF EL )AINATECA • See attachments See attachments TOTAL 0 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf '''' ....................................................... . . .. 11/1/2008 1930-1940 156 See attachments See attachments 11/1/2008 2030-2035 8 11/1/2008 2040-2050 135 11/4/2008 1245-1255 156 11/7/2008 1114-1119 159 11/10/2008 0315-0320 135 11/16/2103 1610-1616 45 TOTAL 794 iPlanner ients Exceedin 1 Hour OR Exceeding 5000 Mcf TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TOEUMINATECAUSE .71■11111•91MOK , See attachments See attachments TOTAL 0 TOTAL plft.nrrJr? 5vents < 1 Hour 233 tkniesi Events > 1 Hour 0 PturP1 efents < 1 hour and not 794 exox,Rding 3,000 MCF plarnad Events > 1 hour or 0 5,000 MCF 4 Purge TOTAL FL - AEC) VOLUME 33,43e 12/10/2008 8:02 PM t Start Date 11/1/2008 =ncf Ds to 11/30/2008 CCP Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF) 08 -563 Flare Relief 11/1/2008 7:30:00 PM 7:40:00 PM 10 minutes No No Yes BP1\BAKERWF 156 Determination Cause T\C 1809 shutdown due to a problem associated with PSV's Action Taken 1809 unit depressured 08 -563 Flare Relief 11/1/2008 8:30:00 PM 8:35:00 PM 5 minutes No No Yes BP1 \BAKERWF 8 Determination Cause 1813 ESD'd after spin cool for water wash Action Taken 1813 depressured 08 -563 Flare Relief 11/1/2008 8:40:00 PM 8:50:00 PM 10 minutes No No Yes BP1\BAKERWF 135 Determination Cause 1813 shutdown to spin cool for water wash Action Taken 1813 depressued 08 -570 Flar ?, "Ielief 11/4/2008 12:45:00 PM 12:55:00 PM 10 minutes No No Yes BP1 \PENNYSD 156 Determination Cause T/C 1812 had leak on PSV sensing line, unloaded and given normal stop Action Taken T/C 1812 depressured 03 -575 Flare 'P!ief 1•!/772008 11:14:00 AM 11:19:00 AM 5 minutes No No Yes BP1 \SMITOR 159 Determination Cause Shut -Down T/C 1812 for maint. Action Taken depressured system 08 -579 =-fare `ielief 11/10/2008 3:15:00 AM 3:20:00 AM 5 minutes No No Yes BP1 \ERHARTRD 135 Determination Cause T\C 1803 shutdown for planned maintenance Action Taken T/C 1803 depressurization complete F!ar9 Start Date 11/1/2008 r e End Date 11/30/2008 CCP Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF) 08 -591 Flare Relief 11/16/2008 4:10:00 PM 4:15:00 PM 5 minutes No No Yes BP1 \TURNERG2 45 Determination Cause T/C 1803 Pressure Tested after maintenace repairs to T -9. Action Taken T/C 1803 Pressure test completed, train depressured from 450 to 30psi for start up. vrts vas r ianng event at r Ji Page 1 of 1 McMains, Stephen E (DOA) From: GPB, Prod Opt TL [GPBProdOptTL @BP.com] Sent: Saturday, November 08, 2008 8:33 AM To: McMains, Stephen E (DOA) Cc: Williamson, Mary J (DOA); GPB, Environ TL; Benson, Gary A; Pfeiffer, Jim A; GPB, Operations Manager; GPB, Environ Advisor East; GPB, Area Mgr Full Field; Buckbee, Rachel A; GPB, Prod Opt TL; GPB, Area Mgr Central (GC1 /3 /FS3); GPB, FS3 OTL Subject: GPB Gas Flaring event at FS3 To: Steve McMains, AOGCC Cc: Jane Williamson, AOGCC steve.mcmains @alaska.gov jane.williamson @alaska.gov 907 - 793 -1241, fax 907 - 276 -7542 907 - 793 -1226 From: James Chesher, GPB Production Optimization Team Leader An extended flaring event occurred at FS3 starting at 11/07/2008 11:27 and stopping at 11/07/2008 19:32 with a volume of 295 (MSCF). The event lasted for 485 minutes. This was due to lube oil problems with CCP compressor 1812 causing an increase in the gas transit pressure, and FS3 flare valve P176V leaked by. Wells 14 -16, 6 -21, 7 -20 and 7 -22 were shut in, P176V closing as a result. Please don't hesitate to contact me if you have further questions. James ++++++++++++++ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ++ James Chesher (alternate: Dwight Warner) GPB Production Optimization Team Leader external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 441 5130 1 1 0/2008 IJrr) VQJ 1' tat 111f cv ait 41 I' J..1 rage t or 2 McMains, Stephen E (DOA) From: Williamson, Mary J (DOA) Sent: Saturday, November 08, 2008 11:48 AM To: GPB, Prod Opt TL Cc: GPB, Environ TL; Benson, Gary A; Pfeiffer, Jim A; GPB, Operations Manager; GPB, Environ Advisor East; GPB, Area Mgr Full Field; Buckbee, Rachel A; GPB, Area Mgr Central (GC1 /3 /FS3); GPB, FS3 OTL; Regg, James B (DOA) Subject: RE: GPB Gas Flaring event at FS3 James, I took a call around 6 pm Thursday (11/7) from Kari DePalma, notifying the Commission that there was a gas release at FS3, that the flow station was being shut -down, and being safed out, that a fire team was on its way, nobody was hurt. Perhaps a note was sent to Jim Regg, who would be your main point of contact, passing on this information, but I did not see any reports regarding this since that call. Is this flare event related to this incident on Thursday? Today you also sent out a flare event notice for CCP occuring on Tuesday and Wed (11/4 -5), also stated that the cause of this was the "CCP high -stage compressor 1812 being taken down for maintenance on the lube oil de- gassing system." The FS3 flaring noted below, states it is due to "lube oil problems with CCP compressor 1812 causing an increase in the gas transit pressure ". There appears to be a relationship between these 2 events. I left a message on the phone. If you could have the appropriate person contact me on Monday to help me understand these events, I would appreciate it. Jane Williamson Sr. Reservoir Engineer AOGCC From: GPB, Prod Opt TL [mailto:GPBProdOptTL @BP.com] Sent: Saturday, November 08, 2008 8:33 AM To: McMains, Stephen E (DOA) Cc: Williamson, Mary J (DOA); GPB, Environ TL; Benson, Gary A; Pfeiffer, Jim A; GPB, Operations Manager; GPB, Environ Advisor East; GPB, Area Mgr Full Field; Buckbee, Rachel A; GPB, Prod Opt TL; GPB, Area Mgr Central (GC1 /3 /FS3); GPB, FS3 OTL Subject: GPB Gas Flaring event at FS3 To: Steve McMains, AOGCC Cc: Jane Williamson, AOGCC steve.mcmains @alaska.gov jane.williamson @ alaska.gov 907 - 793 -1241, fax 907 -276 -7542 907 - 793 -1226 From: James Chesher, GPB Production Optimization Team Leader An extended flaring event occurred at FS3 starting at 11/07/2008 11:27 and stopping at 11/07/2008 19:32 with a volume of 295 (MSCF). The event lasted for 485 minutes. This was due to lube oil problems with CCP compressor 1812 causing an increase in the gas transit pressure, and FS3 flare valve P176V leaked by. Wells 14 -16, 6 -21, 7 -20 and 7 -22 were shut in, P176V closing as a result. Please don't hesitate to contact me if you havt- .urther questions. James • I V' 0 /2008 arts uas r caring event at r S.s Page 2 of 2 ++++++++++++++ + + + + + + + ++ + + + + + + + + + + + + + + + + + + + + ++ James Chesher (alternate: Dwight Warner) GPB Production Optimization Team Leader external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 441 5130 • 11/10/2008 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4. Operator 5 . Month/Year of Disposition 0290000000 PBU CCP/FFGU PBU - EOA BP December -2008 Disposition Volume M CF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 2,276,915 Pool Name Pool Code Percent 7. Reinjected 217,296,854 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 329 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 28,954 11. Used for lease operations (specify in Remarks) 6,478,593 12. Other (see instructions) 0 Authorization >1 hr: MCF Safety 13. TOTAL VOLUME (ITEMS 6 -12) 226,081,645 MCF Lease Use 14. NGL Gas Equivalent 0 MCF Conservation 15. Purchased gas 0 Waste: MCF 16. Transferred from: CGF & FS1 226,081,645 Commissioner Date 17. Transferred to: (Express as a negative #) 0 18. Remarks: Block 11: Fuel Gas = 6,478,593 mscf and Assist Gas = 0 mscf; Block 17: Fuel Gas to LPC = 0 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be Signature Title Manager, Production Taxes and Royalty corrected to pressure of 14.65 psia and to a temperature of 60o F. Printed Name Paul D. Syring Phone (907)564 -5028 Date l t I�� Authority 20 AAC25.235. Form 10 -422 Rev. 1/2004 Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT Page 1 December 2008 (Unplanned Events Tess than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 12/11/2008 2040 -2050 135 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are Tess than or equal to 1 hour TOTAL 135 'Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT '& CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 12/12/2008 1320 -1325 8 See attachments See attachments 12/29/2008 0855 -0900 135 12/29/2008 1110 -1115 51 TOTAL 194 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT &CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 135 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 194 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 28,954 Assist 0; TOTAL FLARED VOLUME 29,283 1/9/2009 2:01 PM • Flare Start Date 12/1/2008 Flare End Date 12/31/2008 CCP Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF) 08 -623 Flare Relief 12/12/2008 1:20:00 PM 1:25:00 PM 5 minutes No No Yes BP1 \TURNERG2 8 Determination Cause T\C 1807 shutdown during start up sequence, starting gas pressure control valve problems. T/C originally tripped on vibration problems, vibe tech replaced probe and filter prior to startup. Action Taken 1807 T/C depressurization completed. 08 -641 Flare Relief 12/29/2008 8:55:00 AM 9:00:00 AM 5 minutes No No Yes BP1 \SANFORSH 135 Determination Cause T/C 1807 SD for Maintenance Action Taken T/C 1807 depressured 08 -641 Flare Relief 12/29/2008 11:10:00 AM 11:15:00 AM 5 minutes No No Yes BP1 \SANFORSH 51 Determination Cause T/C 1807 shut down from spincooling Action Taken T/C 1807 depressured to 0 psig