Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PBU GC 3 / BP Exploration
STATE OF ALASKA AOGCC GAS DISPOSITION FILES YEAR: 2008 FACILITY: PBU GC 3 OPERATOR: BP EXPLORATION , STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition 0290000033 PBU GC 3 PBU - WOA _BP January - 2008 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 885 9. Flared or vented more than 1 hour (see instr.) 1,319 10. Pilot and Purge 12,825 11 Used for lease operations (specify in Remarks) 516,114 I, VIED �,�Y 12. Other (see instructions) / , 0 Officat Use Only ( F @@ \( /Pj !{ Authorization >1 hr. i MCF L. r r Safety / ' 1 i 13. TOTAL VOLUME (ITEMS 6 -12) 531,143 MCF Lease Use 14. NGL Gas Equivalent FEB 2 0 2008 0 MCF Conservation 15. Purchased gas 3 n �� ,�,� 0 Ahem 0 3 3 c 3 its. a s Waste: MCF 16. Transferred from: 0 ii, / `f - ..� - © 1Q C P2w Date DD 17. Transferred to (Express as a negative #) CGF - 27,727,549 18. Remarks: Block 11: Fuel Gas = 516,114 mscf and Assist Gas = 0 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be Signature Title Manager, Production Taxes and Royalty corrected to pressure of 14.65 psia ,44, and to a temperature of 600 F. Printed Name Bernard W. Hajny Phone (907)564 - 5028 Date �/k �� Authority 20 AAC25.235. Form 10 -422 Rev, 1/2004 Submit in Duplicate r BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -3 GAS FLARING INCIDENT REPORT Page 10 January 2008 !Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 1/2/2008 1400 -1410 104 Not required for unplanned events <= 1 hr Not required for unplanned events which 1/19/2008 2124 -2128 44 1/20/2008 0314 -0322 122 1/20/2008 0409 -0437 525 1/25/2008 0219 -0232 90 TOTAL 885 Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 1/27/2008 0756 -0916 1,319 See Attachments See Attachments TOTAL 1,319 (Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 !Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 885 Unplanned Events > 1 Hour 1,319 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 12,825 Assist 0 TOTAL FLARED VOLUME 15,029 2/7/2008 10:14 AM C Flare Start Date 1/1/2008 Flare End Date 1/31/2008 GC3 Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF) 08 -52 Flare Relief 1/27/2008 7:56:00 AM 9:16:00 AM 80 minutes Yes No No BP1 \SMITHHD 1319 Determination Cause LPS compressor K -7000 shutdown because of a problem associated with instrumentation Action Taken WOA reduced production rates and shut -in 14 wells equaling 75 mmscfd. Wells were shut -in or choked back starting at 0756 hours. McMains, Stephen E (DOA) From: GPB, Prod Opt TL [GPBProdOptTL @BP.com] Sent: Friday, February 01, 2008 3:45 PM To: McMains, Stephen E (DOA) Cc: GPB, Environ TL; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Environ Advisor West; GPB, GC2 OTL; GPB, Area Mgr West (GC2/WRD); GPB, Area Mgr Central (GC1 /3 /FS3); GPB, GC3 OTL Subject: GPB Gas Flaring Events To: Steve McMains, AOGCC steve_mcmains @admin.state.ak.us 907 - 793 -1241, fax 907 - 276 -7542 From: Hal Tucker, GPB Production Optimization Team Leader Several extended flaring events occurred at GC2 during various plant upsets and maintenance activities over the last two weeks. On January 19 extended flaring occurred off the IP and LP compressors due to low plant oil rate. Plant oil rate was down due to level valve maintenance on D -slug catcher. The event duration was 282 minutes, with a total flared volume of 4700 MSCF. On January 21 extended flaring occurred off the LP compressors due to low plant oil rate. Plant oil rate was down to repair a PSV in the PW plant. Flare duration was 1259 minutes, with a total flared volume of 18,360 MSCF. On January 23 extended flaring occurred off the LP compressors due to low plant oil rate. Plant oil rate was reduced due to fuel gas repairs on the K7000 LPS turbine /compressor. The situation was exacerbated when L -pad shut down due to a Fire and Gas system failure and the main produced water pump shut down due to high vibration, both during phase III weather conditions. Flare duration was 1027 minutes, with a total flared volume of 17,830 MSCF. The low oil rates from the January 23 events, continued through January 27, resulting in extended flaring events during that time. 1/24 flare duration 1019 minutes, volume 9,900 MSCF 1/25 flare duration 1440 minutes, volume 12,991 MSCF 1/26 flare duration 1424 minutes, volume 12,856 MSCF 1/27 flare duration 96 minutes, volume 867 MSCF The event ended on 1/27 at 03:23 when the B- Sulzer was brought on line following completion of seal repairs Gait also had an extended flaring event during this time frame. The event was caused when K7000 LPS turbine /compressor shut down due to an instrumentation problem. GC3 shut in 14 wells, totaling 75 MMSCFD to get out flare. The event occurred on January 27, beginning at 07:56, ending at 09:16 (80 minutes). Total volume flared was 1,319 MSCF. If you require additional information, please don't hesitate to call me. Hal Tucker GPB Production Optimization TL (907) 659 - 4472/5566 ' 1 ti STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3 Field 4. Operator 5. Month/Year of Disposition 0290000033 PBU GC 3 PBU - WOA BP February - 2008 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 71 9. Flared or vented more than 1 hour (see instr.) 6,028 10. Pilot and Purge 12,249 11. Used for lease operations (specify in Remarks) 479,222 Official Use fly 12. Other (see instructions) 0 Authorization >1 hr: MCF Safety o 0 -2 S' 13. TOTAL VOLUME (ITEMS 6 -12) 497,570 CS7 MCF Lease Use 14. NGL Gas Equivalent 0 MCF Conservation 15. Purchased gas 0 Waste: MCF 16. Transferred from: 0 Agy C ` -7DaQ 17. Transferred to: (Express as a negative #) CGF - 26,103,956 18. Remarks: Block 11: Fuel Gas = 479,222 mscf and Assist Gas = 0 mscf I hereby certify that the for going is true nd r ect to the best of my knowledge. Note: All volumes must be Signature Title Manager, Production Taxes and Royalty corrected to pressure of 14.65 psis and to a temperature of 60o F. Printed Name Bernard W. Hajny Phone (907)564 - 5028 Date /, fk Authority 20 AAC25.235. Form 10 -422 Rev. 1/2004 Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -3 GAS FLARING INCIDENT REPORT Page 10 February 2008 'Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 2/3/2008 2332 -2338 71 Not required for unplanned events <= 1 hr Not required for unplanned events which TOTAL 71 (Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 2/8/2008 1335 -1845 6,028 See Attachments See Attachments TOTAL 6,028 'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 71 Unplanned Events > 1 Hour 6,028 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 12,249 Assist 0 TOTAL FLARED VOLUME 18,348 3/6/2008 3:46 PM Flare Start Date 2/1 /2008 Flare End Date 2/29/2008 GC3 Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF) 08 -83 Flare Relief 2/8 /2008 1:35:00 PM 6:45:00 PM 310 minutes No No No BP1 \HAYNESBS 6028 Determination Cause Wet Gas compressor shutdown because of automation work on PCM 130. Action Taken Flaring was permitted to continue while GC operations personnel attempted to restart the equipment. 4 restarts attempted at 1443 hrs, 1452hrs, 1520 hrs, and 1818 hrs. Water rates were cut per procedure. Generated 3/3/2008 McMains, Stephen E (DOA) From: GPB, Prod Opt TL [GPBProdOptTL @BP.com] Sent: Sunday, February 10, 2008 6:26 AM To: McMains, Stephen E (DOA) Cc: GPB, Environ TL; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Environ Advisor West; GPB, GC3 OTL; GPB, Area Mgr Central (GC1 /3 /FS3) Subject: GPB Gas Flaring Event To: Steve McMains, AOGCC steve_mcmains @admin.state.ak.us 907 - 793 -1241, fax 907 - 276 -7542 From: Dwight Warner, GPB Production Optimization Team Leader On February 8th and extended flaring event occurred at GC3 when the wet gas compressor K -5500 shutdown during automation work on PCM -130 card. While attempting to restart the suction slide valve would not move and had to be repaired. The event began at 13:35 and ended at 18:45 for a duration of 310 minutes, with a total flared volume of 6028 MSCF. If you require additional information, please don't hesitate to call me. Dwight Warner GPB Production Optimization TL (907) 659 - 5566/4472 1 • STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition 0290000033 _PBU GC 3 PBU - WOA BP March - 2008 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6 Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 96 10. Pilot and Purge 14,251 11. Used for lease operations (specify in Remarks) 513,817 Official Use Only 12. Other (see instructions) 0 Authorization >1 hr: MCF Safety - , Li 13. TOTAL VOLUME (ITEMS 6 -12) 528,164 �' Y 4 � MCF I Lease Use 14. NGL Gas Equivalent 0 MCF I Conservation 15. Purchased gas 0 Waste' MCF 16. Transferred from: 0 ( / — / 6 8 missi (? ( DDate 17. Transferred to: (Express as a negative #) CGF - 26,494,100 18. Remarks: Block 11: Fuel Gas = 513,817 mscf and Assist Gas = 0 mscf I hereby certify that the foregoing is true a o t to the best of my knowledge. Note: All volumes must be Signature Title Manager, Production Taxes and Royalty corrected to pressure of 14.65 psis t � ^ and to a temperature of 60o F. �/ r✓ Printed Name Bernard W. Hajny Phone (907)564 -5028 Date ! -e78 Authority 20 AAC25.235. Form 10 -422 Rev. 1/2004 Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -3 GAS FLARING INCIDENT REPORT Page 8 March 2008 (Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events <= 1 hr Not required for unplanned events which TOTAL 0 (Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 3/10/2008 0950 -1426 96 See Attachments See Attachments TOTAL 96 !Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events > 1 Hour 96 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 14,251 Assist 0 TOTAL FLARED VOLUME 14,347 4/7/2008 3:39 PM Flare Start Date 3/1/2008 Flare End Date 3/31/2008 GC3 Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermi'nt Blk Smoke Planned Reported By Volume (MSCF) 08 -127 Flare Relief 3/10/2008 9:50:00 AM 2:26:00 PM 276 minutes Yes No No BP1 \MILLERGW 96 Determination Cause LPS compressor K -7000 and K -7001 shutdown because of a problem associated with bad data highway. Whole plant S/D and all incoming flow was S/D (all wellpads). Action Taken Flaring was permitted to continue while GC operations personnel attempted to restart the equipment. 1 of restarts attempted at 1426 hrs, after troubleshooting and 0/0 of bad data highway. Flaring was intermittent. GPB Gas Flaring Event Page 1 of 1 McMains, Stephen E (DOA) From: GPB, Prod Opt TL [GPBProdOptTL @BP.com] Sent: Tuesday, March 11, 2008 8:05 PM To: McMains, Stephen E (DOA) Cc: Williamson, Mary J (DOA); GPB, Environ TL; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Environ Advisor West; GPB, GC3 OTL; GPB, Area Mgr Central (GC1 /3 /FS3) Subject: GPB Gas Flaring Event To: Steve McMains, AOGCC Cc: Jane Williamson, AOGCC steve.mcmains @alaska.gov jane.williamson @ alaska.gov 907 - 793 -1241, fax 907 - 276 -7542 907 - 793 -1226 From: Dwight Warner, GPB Production Optimization Team Leader On March 10 an extended flaring events occurred at GC3. The cause of the event was GC3 shutting down due to cable problem on the data highway. The LPS compressors K -700 and K -7001 had shutdown as well as all flow from the wellpads. Flaring continure intermittently while GC operation personnel attempted to restart. After troubleshooting and change out of bad data highway the plant was successfully restarted. The event began at 09:50 and ended at 14:26 for a duration of 276 minutes, with a total flared volume of 96 MSCF. The flaring was intermittent thoughout this time frame. If you require additional information, please don't hesitate to call me. Dwight Warner GPB Production Optimization TL (907) 659 - 5566/4472 3/12/2008 j s STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4, Operator 5. Month/Year of Disposition 0290000033 PBU GC 3 PBU - WOA BP April - 2008 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6, Sold 0 Pool Name Pool Code Percent PRUDHOE 640150 100.00% 7, Reinjected 0 8. Flared or vented 1 hour or less 87 9. Flared or vented more than 1 hour (see instr.) 8,875 10. Pilot and Purge 12,753 11. Used for lease operations (specify in Remarks) 458,310 12 Other (see instructions) 0 Official Use Only �3 Authorization >1 hr � - MCF y a; , il+ Safety i , 13. TOTAL VOLUME (ITEMS 6 -12) 480,025 MCF Lease Use 14. NGL Gas Equivalent MAY 2 3 2008 0 MCF Conservation 15. Purchased gas a E ,,, f OM. Ccawniseten 5 Waste: MCF 16. Transferred from: 0 _ / _ mmissioner Date D(e CCJJ 17. Transferred to: (Express as a negative #) CGF - 20,021,299 18. Remarks: Block 11: Fuel Gas = 458,310 mscf and Assist Gas = 0 mscf I hereby certify that the for is true and correct to the best of my knowledge. Note: All volumes must be Signature --d Title Manager, Production Taxes and Royalty corrected to pressure of 14.65 psia and to a temperature of 60o F. Printed Name Bernard W. Hajny Phone (907)564 - 5028 Date O Authority 20 AAC25.235. Form 10 -422 Rev. 1/2004 Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -3 GAS FLARING INCIDENT REPORT Page 1 April 2008 (Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 4/19/2008 1540 -1545 31 Not required for unplanned events <= 1 hr Not required for unplanned events which 4/21/2008 0832 -0842 56 TOTAL 87 'Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 4/1- 2/2008 2339 -0100 8,875 See Attachments See Attachments TOTAL 8,875 'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 87 Unplanned Events > 1 Hour 8,875 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 12,753 Assist 0 TOTAL FLARED VOLUME 21,715 5/8/2008 1:29 PM .� • Flare Start Date 4/1/2008 Flare End Date 4/30/2008 GC3 Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF) 08 -145 Flare Relief 4/1/2008 11:39:00 PM 12:00:00 AM 21 minutes No No No BP1 \CLARKTL 4375 Determination Cause LPS compressor K -7000 shutdown because of a problem associated with a QB module. Action Taken WOA reduced production rates and choked back 40 wells equaling 300 mmscfd. Wells were shut -in or choked back starting at 2345 hours. 08 -146 Flare Relief 4/2/2008 12:00:00 AM 1:00:00 AM 60 minutes No No No BP1 \CLARKTL 4500 Determination Cause LPS compressor K -7000 shutdown due to a problem associated with the QB moodule. Action Taken WOA reduced production rates and choked back 40 wells equaling 300 mmscfd. Wells were shut -in or choked back starting at 2345 hours. K -7000 back on -line @ 0050 hours. a GPB Gas Flaring Event Page 1 of 1 McMains, Stephen E (DOA) From: GPB, Prod Opt TL [GPBProdOptTL @BP.com] Sent: Saturday, April 05, 2008 2:28 PM To: McMains, Stephen E (DOA) Cc: Williamson, Mary J (DOA); GPB, Environ TL; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Environ Advisor West; GPB, Area Mgr Central (GC1 /3 /FS3); GPB, GC3 OTL Subject: GPB Gas Flaring Event To: Steve McMains, AOGCC Cc: Jane Williamson, AOGCC steve.mcmains @alaska.gov jane.williamson @ alaska.gov 907 - 793 -1241, fax 907 - 276 -7542 907 - 793 -1226 From: Dwight Warner, GPB Production Optimization Team Leader On April 1st and 2nd an extended flaring event occurred at t ':The LPS compressor K -7000 shutdown because of control instrumentation failure associated with aPll3 Module error. Reduced production rates until the machine was restarted. This event began late on April 1st and carried over into April 2nd which caused it to show up as two flaring events. The extended event began on April 1st at 02:39 and ended at 24:00 for a duration of 21 minutes, with a total flared volume of 4,375 MSCF. The event continued into April 1st from 00:00 to 01:00 for a duration of 60 minutes, with a total flared volume of 4500 MSCF The event totals were 81 minutes, with a total flared volume of 8,875 MSCF. If you require additional information, please don't hesitate to call me. Dwight Warner GPB Production Optimization TL (907) 659 - 4472/5566 4/7/2008 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition 0290000033 PBU GC 3 PBU - WOA BP May - 2008 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 4,674 / 9. Flared or vented more than 1 hour (see instr.) 1,414 10. Pilot and Purge 14,670 11. Used for lease operations (specify in Remarks) 447,220 ..... _ Official Use cnly '. . 12. Other (see instructions) 0 Authorization >1 hr: MCF Safety • //4 41/1 13. TOTAL VOLUME (ITEMS 6 -12) 467,978 MCF Lease Use 14. NGL Gas Equivalent 0 MCF Conservation 15. Purchased gas 0 Waste: MCF 16. Transferred from: 0 C mmissioner � Da,e 6 17. Transferred to: (Express as a negative #) CGF - 23,168,002 18. Remarks: Block 11: Fuel Gas = 447,220 mscf and Assist Gas = 0 mscf I hereby certify that the for oing is true a d correct to the best of my knowledge. Note: All volumes must be Signature Title Manager, Production Taxes and Royalty corrected to pressure of 14.65 psia / -7/° _ Q and to a temperature of 60o F. (� Printed Name Bernard . Hajn Phone (907)564 -5028 Date /- 15 Authority 20 AAC25.235. Form 10 -422 Rev. 1/2004 Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -3 GAS FLARING INCIDENT REPORT Page 1 May 2008 'Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 5/8- 9/2008 2326 -0026 2,500 Not required for unplanned events <= 1 hr Not required for unplanned events which 5/26/2008 1840 -1906 903 5/27/2008 1645 -1715 1,042 5/31/2008 2053 -2058 35 TOTAL 4,480 (Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 5/6/2008 0804 -1344 1,015 See Attachments See Attachments TOTAL 1,015 'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 5/18/2008 1403 -1459 194 See Attachments See Attachments TOTAL 194 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 5/18/2008 1550 -1745 399 See Attachments See Attachments TOTAL 399 TOTAL Unplanned Events < 1 Hour 4,480 Unplanned Events> 1 Hour 1,015 Planned Events < 1 hour and not 194 exceeding 5,000 MCF Planned Events > 1 hour or 399 exceeding 5,000 MCF Pilot Purge 14,670 Assist 0 TOTAL FLARED VOLUME 20,758 6/10/2008 2:29 PM Flare Start Date 5/1/2008 Flare End Date 5/31/2008 GC3 Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF) 08 -206 Flare Relief 5/6/2008 8:04:00 AM 1:44:00 PM 340 minutes No No No BP1 \FONTENE 1015 Determination Cause K -5500 wet gas compressor S/D because of low suction pressure. Wellpas were in Level -III weather conditions. Action Taken After some instrumentation adjustments,K -5500 was restarted. 08 -244 Flare Relief 5/18/2008 2:03:00 PM 2:59:00 PM 56 minutes No No Yes BP1 \MESSERTD 194 Determination Cause Depressuring D -Bank 1st stage to repair leak. Action Taken No response taken as this was deemed to be of short duration. 08 -244 Flare Relief 5/18/2008 3:50:00 PM 5:45:00 PM 115 minutes No No Yes BP1 \MESSERTD 399 Determination Cause Depressuring D -Bank 1st stage to repair leak. Action Taken No response taken as this was deemed to be of short duration. GPB Gas Flaring Event Page 1 of 1 McMains, Stephen E (DOA) From: GPB, Prod Opt TL [GPBProdOptTL @BP.com] Sent: Wednesday, May 07, 2008 9:18 AM To: McMains, Stephen E (DOA) Cc: Williamson, Mary J (DOA); GPB, Environ TL; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Environ Advisor West; GPB, Area Mgr Central (GC1 /3 /FS3); GPB, GC3 OTL Subject: GPB Gas Flaring Event To: Steve McMains, AOGCC Cc: Jane Williamson, AOGCC steve.mcmains @alaska.gov jane.williamson @alaska.gov 907 - 793 -1241, fax 907 - 276 -7542 907 - 793 -1226 From: Dwight Warner, GPB Production Optimization Team Leader An extended flaring event occurred at GC3 on May 6 when K -5500 wet gas compressor shut down due to low suction pressure. Due to Level III weather conditions the pads were not accessible to reduce rate while troubleshooting. Instrument technicians were able to troubleshoot the problem and the machine was restarted. The flaring event began at 0804 and ended at 1344 (340 minutes), the total volume flared was 1015 MSCF. If you require additional information, please don't hesitate to call me. Dwight Warner GPB Production Optimization TL (907) 659 - 5566/4472 5/7/2008 ' GPB Gas Flaring Event Page 1 of 2 McMains, Stephen E (DOA) From: GPB, Prod Opt TL [GPBProdOptTL @BP.com] Sent: Saturday, May 10, 2008 8:25 PM To: McMains, Stephen E (DOA) Cc: Williamson, Mary J (DOA); GPB, Environ TL; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Environ Advisor West; GPB, Environ Advisor East; GPB, Area Mgr Central (GC1 /3 /FS3); GPB, GC3 OTL; GPB, GC2 OTL; GPB, GC1 OTL; GPB, Area Mgr North (Gas Plants /GPMA); GPB, GPMA OTL; GPB, Gas Plants OTL; GPB, Area Mgr East (FS1 /2 /COTU /Seawater); GPB, FS1 OTL; GPB, FS2 /COTU OTL; GPB, Area Mgr West (GC2/WRD); GPB, GC2 OTL Subject: GPB Gas Flaring Event To: Steve McMains, AOGCC Cc: Jane Williamson, AOGCC steve.mcmains @alaska.gov jane.williamson @alaska.gov 907 - 793 -1241, fax 907 - 276 -7542 907 - 793 -1226 From: Dwight Warner, GPB Production Optimization Team Leader The CPS (Central Power Station) shut down at 23:20 on 5/8/08 when air supplying the fuel control valves was interrupted during snow removal. This caused all production facilities and the gas plants to shut down. Power was partial re- established at 02:13 and most of the facilities were back on shore power by 03:30. Listed below are the facilities that flared for more than an hour or total volume flared exceeded 5000 MSCF as well as the facilities that flared but did not exceed this criteria to help with month end reports. Most of the flaring carried over to 5/9/08 and since the flare reports are midnight to midnight I have provide total volumes. Also, provided extended flaring events while starting up. FS1 - Annex flaring began at 23:13 on 5/8 and ended at 23:28 (15 minutes), the total volume flared for the event was 14583 MSCF - Old plant flaring began at 23:13 on 5/8 and ended at 23:28 (15 minutes), the total volume flared for the event was 14166 MSCF - Power outage caused the Annex to SESD on low instrument air pressure. Flaring began at 23:45 and ended at 23:59 (14 minutes), total volume flared was 950 MSCF FS2 - Flaring began at 23:15 on 5/8 and ended at 23:30 (15 minutes), the total volume flared was 1400 MSCF FS3 - Flaring began at 23:20 on 5/8 and ended at 0445 on 5/9 (323 minutes), volume flared on 5/8 (39 minutes) was 905 MSCF, volume flared on 5/9 (284 minutes) was 2032 MSCF, the total volume flared for the event was 2937 MSCF. - Common line 7D manually depressured to flare due to leaking upstream valves after power outage. Depressuring stopped once common line 7D was at desired pressure. Flaring began at 02:40 and ended at 04:15 (95 minutes). Total volume flared was 22 MSCF - Common line 6C/13B manually depressured to flare due to leaking upstream valves after power 5/12/2008 GPB Gas Flaring Event Page 2 of 2 outage. Depressuring stopped once common line 6C/13 B was at desired pressure. Flaring began at 05:45 and ended at 07:20 (95 minutes). Total volume flared was 303 MSCF. - Facility restart post Fieldwide power outage. Intermittent flaring from vessels while attempting to start, load and stabilize compressor trains. Flaring began at 10:40 and ended at 22:50 (730 minutes). Total volume flared was 11,310 MSCF. GC1 - Flaring began at 23:16 on 5/8 and ended at 23:52 (36 minutes). Total volume flared was 1650 MSCF - While bring rate up following shut down, LPS compressors exceeded maximum gas capacity and discharged to flare. Flaring event began at 11:40 on 5/9 and ended at 13:15 (95 minutes). Total volume flared was 10 MSCF GC2 - Did not go to flare on 5/8. - During startup an extended flaring event due to low rates during start up. Flaring began at 09:35 on 5/9 and ended at 23:59 (864 minutes). Total volume flared was 15,000 MSCF. GC3 - Flaring began at 23:26 and ended at 23:59 (33 minutes). Total volume flared was 1,417 MSCF LPC Flaring event began at 23:12 on 5/8 and ended at 02:43 on 5/9 (211 minutes), volume flared on 5/8 was 7977 MSCF (48 minutes), volume flared on 5/9 was 12873 MSCF (163 minutes), the total volume flared for the event was 20,850 MSCF. This was a black smoke event. If you require additional information, please don't hesitate to call me. Dwight Warner GPB Production Optimization TL (907) 659- 5566/4472 5/12/2008 .GPB Gas Flaring Events Page 1 of 2 McMains, Stephen E (DOA) From: GPB, Prod Opt TL [GPBProdOptTL @BP.com] Sent: Tuesday, May 20, 2008 6:47 AM To: McMains, Stephen E (DOA) Cc: Williamson, Mary J (DOA); GPB, Environ TL; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Environ Advisor East; GPB, Environ Advisor West; GPB, Area Mgr East (FS1 /2 /COTU /Seawater); GPB, Area Mgr Central (GC1 /3 /FS3); GPB, Area Mgr West (GC2 /WRD); GPB, Area Mgr North (Gas Plants /GPMA); GPB, Gas Plants OTL; GPB, FS1 OTL; GPB, FS3 OTL; GPB, GC2 OTL; GPB, GC3 OTL Subject: GPB Gas Flaring Events To: Steve McMains, AOGCC Cc: Jane Williamson, AOGCC steve.mcmains @alaska.gov jane.williamson @alaska.gov 907 - 793 -1241, fax 907 - 276 -7542 907 - 793 -1226 From: Hal Tucker, GPB Production Optimization Team Leader Several extended flaring event occurred at Greater Prudhoe Bay during the last week. On 5/12 an extended event occurred at CGF when T/C 1805 shut down due to an instrument problem. Total duration of the event was 84 minutes. Total volume flared was 12,228 MSCF. Two extended flaring events occurred at GC2 on 5/13 and 5/14. Both events were related to the full plant shut down initiated due to an inadvertent valve closure on the oil transit line. The first event began at 07:37 and ended at 23:40. Flaring from the IP and LP vessels occurred during troubleshooting and plant restart preparation. The second event began at 01:38 and ended at 11:00 when sufficient oil rate was brought on line to allow the IP /LP compressors to load up. Total duration and volume for the first event was 963 minutes and 16,719 MSCF. The second event had a total duration and volume of 572 minutes and 596 MSCF. An extended flaring event occurred on 5/14 at FS3 while performing safe out operations in preparation for unplanned maintenance on T/C 1801. T /C's 1801 and 1802 are the STV /IP machines for FS3 and both needed to be shut down to install blinds to enable repairs to 1801. 1801 sustained damage during the full field shut down (CPS power outage). The flaring event began on 5/14 at 09:00 and ended on 5/15 at 23:59 (39 hours), total volume flared was 14,125 MSCF. Four extended flaring events occurred of FS1 on from 5/15 through 5/17. All four events were associated with planned maintenance (water washes) on LPS T /C's 1803 and 1804. The first two events were the spin cooling to prep for the water wash and cranking during the water wash for T/C 1803. The second two events were for T/C 1804 (same activities). 1803 spin cool 120 minutes, 775 MSCF and crank 90 minutes, 572 MSCF - - -- both on 5/15 1804 spin cool 118 minutes, 658 MSCF and crank 60 minutes, 383 MSCF - - -- 5/16 spin and 5/17 crank An extended flaring event occurred on 5/18 at GC3 to depressure D -bank, 1st stage, HP separator piping to repair a small leak. The event began at 15:50 and ended at 17:45. Total duration was 115 minutes, total volume was 399 MSCF. On 5/19 an extended flaring event occurred at CGF. MI T/C 1855 was shut down and depressured to repair an oil leak. Total duration was 155 minutes, total volume was 285 MSCF. 5/20/2008 .GPB Gas Flaring Events Page 2 of 2 If you require additional information, please don't hesitate to call me. Hal Tucker GPB Production Optimization TL (907) 659 - 5566/4472 5/20/2008 s : STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition 0290000033 PBU GC 3 PBU - WOA BP June -2008 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 7,587 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 12,732 11. Used for lease operations (specify in Remarks) 397,079 12. Other (see instructions) 0 Qfficipl Us@ „Only ; Authorization >1 hr: MCF Safety 13. TOTAL VOLUME (ITEMS 6-12) 417,398 MCF Lease Use 14. NGL Gas Equivalent 0 MCF Conservation 15. Purchased gas 0 Waste: MCF 16. Transferred from: 0 Commissioner Date 17. Transferred to: (Express as a negative #) CGF - 21,380,712 18. Remarks: Block 11: Fuel Gas = 397,079 mscf and Assist Gas = 0 mscf I hereby certify that the f regoing is tr e and rrect to the best of my knowledge. Note: All volumes must be Signature Title Manager, Production Taxes and Royalty corrected to pressure of 14.65 psis %� {� and to a temperature of 60o F. Printed Name Bema W. Hajny Phone (907)564 -5028 Date / `"/ 7 ' Authority 20 AAC25.235. Form 10 -422 Rev. 1/2004 Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING INCIDENT REPORT Page 1 June 2008 Unplanned Events less than or equal to 1 hour • • ..... . VOL.UME DE$CRIPTIONQF INCIDENT & CAUSE -ACTIONTAKENTO ELIMINATE CAUSE 6/10/2008 1404 87 Not required for unplanned events <= 1 hr Not required for unplanned events which 6/28/2008 2230-2330 7,500 TOTAL 7,587 l Unplanned Events greater than 1 hour DATE. '•:• TIME VOLUM DESCRIP1ION OF INCIDENT & CAUSE • • : See Attachments See Attachments TOTAL 0 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE . 1IIME VOLUME DESORIPTION OF INOIDENT & CAUSE • " ACTION TAKEN TO EL1MINATE.CAUSE' See Attachments See Attachments TOTAL 0 1 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE 11ME VOLUME OESORIF:),TIONOP CAUSE • ACTION TAKEOTO:ELIMINATECAUSE See Attachments See Attachments TOTAL 0 TOTAk Unplanned Events < 1 Hour 7,587 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME 20,319 7/14/2008 6:19 PM IJr Vab riaiiiig ENCllLS rage 1 OI L McMains, Stephen E (DOA) From: GPB, Prod Opt TL [GPBProdOptTL @BP.com] Sent: Friday, July 04, 2008 9:55 AM To: McMains, Stephen E (DOA) Cc: Williamson, Mary J (DOA); GPB, Environ TL; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Environ Advisor East; GPB, Environ Advisor West; GPB, FS1 OTL; GPB, FS2 /COTU OTL; GPB, GC1 OTL; GPB, GC2 OTL; GPB, GC3 OTL; GPB, Area Mgr Central (GC1 /3 /FS3); GPB, Gas Plants OTL; GPB, Area Mgr North (Gas Plants /GPMA); GPB, Area Mgr West (GC2/WRD); GPB, Area Mgr East (FS1 /2 /COTU /Seawater); GPB, Area Mgr Full Field Subject: GPB Gas Flaring Events To: Steve McMains, AOGCC Cc: Jane Williamson, AOGCC steve.mcmains @alaska.gov jane.williamson @alaska.gov 907 - 793 -1241, fax 907 - 276 -7542 907 - 793 -1226 From: Dwight Warner, GPB Production Optimization Team Leader An extended flaring event occurred at CGF on June 28 with 1855 T/C problems associated with the planned shutdown. Continued troubleshooting, reloaded 1855 T/C and stabilized facility process and operation. The flaring event began at 13:40 and ended at 14:45 (65 minutes), the total volume flared was 992 mscf. An extended flaring event occurred at CGF on June 28 with 1855 T/C problems associated with the planned shutdown. Continued troubleshooting, reloaded 1855 T/C and stabilized facility process and operation. The flaring event began at 15:30 and ended at 17:24 (114 minutes), the total volume flared was 1756 mscf. An extended flaring event occurred at FS1 on June 28 depressuring the artificial lift gas system for maintenance on valves. The flaring event began at 09:00 and ended at 22:00 (780 minutes), the total volume flared was 1450 MSCF. An extended flaring event occurred at FS2 on June 28 depressuring common line 16 D for maintenance at the Drill Site. The flaring event began at 05:00 and ended at 08:30 (210 minutes), the total volume flared was 397 mscf. An extended flaring event occurred at FS2 on June 29 depressuring common line 11 A and 11 D simultaneously for maintenance at the Drill Site. The flaring event began at 00:47 and ended at 02:55 (128 minutes), the total volume flared was 142 mscf. An extended flaring event occurred at GC1 on June 28 depressuring the Y Pad LDF for safeout on the gas lift system. The flaring event began at 22:30 and ended at 23:30 (60 minutes), the total volume flared was 16, 666 mscf. An extended flaring event occurred at GC2 on June 28 due to low oil rates during the TAPS proration. The flaring event began at 04:51 and ended at 05:55 (64 minutes), the total volume flared was 578 mscf. An extended flaring event occurred at GC3 on June 28 depressuring the Y Pad LDF for safeout on the gas 7/7/2008 arts uas r caring tvenrs rage z or z lift system. The flaring event began at 22:30 and ended at 23:30 (60 minutes), the total volume flared was 16, 666 mscf. If you require additional information, please don't hesitate to call me. Dwight Warner GPB Production Optimization TL (907) 659 - 5566/4472 1 7/7/2008 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition 0290000033 _PBU GC 3 PBU - WOA BP July -2008 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of P Poo P p o Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 2,803 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 12,505 11. Used for lease operations (specify in Remarks) 209,679 Official Use Only 12. Other (see instructions) 0 Authorization >1 hr: MCF Safety 13. TOTAL VOLUME (ITEMS 6 -12) 224,987 MCF Lease Use 14. NGL Gas Equivalent 0 Conservation MCF 15. Purchased gas 0 Waste: MCF 16. Transferred from: 0 Commissioner Date 17. Transferred to: (Express as a negative #) CGF - 10,246,595 18. Remarks: Block 11: Fuel Gas = 209,679 mscf and Assist Gas = 0 mscf I hereby certify that the fo oing is true d cor t to the best of my knowledge. Note: All volumes must be Signature Title Manager, Production Taxes and Royalty corrected to pressure of 14.65 psis _ r and to a temperature of 60o F. Printed Name Bernard W. Hajny Phone (907)564 -5028 Date �� ���1 Authority 20 AAC25.235. Form 10 -422 Rev. 1/2004 Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING INCIDENT REPORT Page 1 July 2008 Un • tanned Events less than or equal to 1 hour DATE .':!: "if.Q.44106!!!!!•!1! DESORlprOff Or:INCIDENT &:CAUSE .ACTION TAKEN TO ELNINNFE: i0AUSE 7/15/2008 1,531 Not required for unplanned events <= 1 hr Not required for unplanned events which 7/16/2008 . 0015=0029 - 438 7/25/2008 1359-1414 - 410 7/26/2008 1227-1238 382 2,761 Unplanned Events greater than 1 hour DATE ' TIME VOLUME OESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 harmed Events Less Than 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAU ACTION TAKEN TO ELIMINATE CAUSE 7/14/2008 1600-1612 42 See Attachments See Attachments TOTAL 42 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE ' .: & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Unplanned Events < 1 Hour - 2,761 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 42 exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist , i..; . 4telhA4,1Z*7041: TOTAL FLARED VOLUME 15,308 8/13/2008 2:15 PM Flare Start Date 7/1/2008 Flare End Date 7/31/2008 GC3 Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF) 08 -332 Flare Relief 7/14/2008 4:00:00 PM 4:12:00 PM 12 minutes No No Yes BP1 \WHITSTJS 42 Determination Cause While leak testing newly installed valves on A -Pad Depressured pad though flare valve off B- Slugcatcher GC -3. Action Taken No action required this was a planned event. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition 0290000033 PBU GC 3 PBU - WOA BP August -2008 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold Pool Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 3,500 9. Flared or vented more than 1 hour (see instr.) 3,635 10. Pilot and Purge 18,150 11. Used for lease operations (specify in Remarks) 459,293 12. Other (see instructions) Authorization >1 hr: MCF Safety 36 .3 �� 13. TOTAL VOLUME (ITEMS 6 -12) 484,578 MCF Lease Use 14. NGL Gas Equivalent 0 MCF Conservation 15. Purchased gas 0 Waste: MCF 16. Transferred from: 0 / 10 -z8 - C mmissione Date 17. Transferred to: (Express as a negative #) CGF - 25,758,296 18. Remarks: Block 11: Fuel Gas = 459,293 mscf and Assist Gas = 0 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be Signature ) Title Manager, Production Taxes and Royalty corrected to pressure of 14.65 psia and to a temperature of 60o F. Printed Name Bernard W. Hajny Phone (907)564 -5028 Date G Authority 20 AAC25.235. Form 10 -422 Rev. 1/2004 Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -3 GAS FLARING INCIDENT REPORT Page 1 August 2008 (Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 8/15/2008 2200 -2242 3,500 Not required for unplanned events which Not required for unplanned events which are Tess than or equal to 1 hour are less than or equal to 1 hour TOTAL 3,500 'Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT &CAUSE ACTION TAKEN TO ELIMINATE CAUSE 8/19- 20/2008 2348 -0340 3,450 See Attachments See Attachments TOTAL 3,450 'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 8/23/2008 0142 -0417 185 See Attachments See Attachments TOTAL 185 TOTAL Unplanned Events < 1 Hour 3,500 Unplanned Events > 1 Hour 3,450 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 185 exceeding 5,000 MCF Pilot Purge 18,150 Assist 0 TOTAL FLARED VOLUME 25,285 9/9/2008 11:27 AM Flare Start Date 8/1/2008 Flare End Date 8/31/2008 GC3 Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Blk Smoke Planned Reported By Volume (MSCF) 08 -414 Flare Relief 8/19/2008 9:48:00 PM 12:00:00 AM 132 minutes No No No BP1\JACKSOWM 2200 Determination Cause Wet Gas compressor shutdown because of power failure in the gas section. Action Taken BP reduced rates to cut water production and cut purge gas to minimize flaring. Operations continues to troubleshoot problem. 08 -415 Flare Relief 8/20/2008 12:00:00 AM 3:40:00 AM 220 minutes No No No BP1' JACKSOWM 1250 Determination Cause Wet Gas compressor shutdown because of power failure in the gas section. Action Taken BP reduced rates to cut water production and cut purge gas to minimize flaring. Replaced MCC breaker and restarted compressor. 08 -420 Ctrld Blowdwn 8/23/2008 1:42:00 AM 4:17:00 AM 155 minutes No No Yes BP1 \HAYNESBS 185 Determination Cause De- pressured X -Pad LDF to flare for safe -out of pad. Action Taken None. GPB flaring events 8/23 Page 1 of 1 McMains, Stephen E (DOA) From: GPB, Prod Opt TL [GPBProdOptTL @BP.com] Sent: Sunday, August 24, 2008 12:20 PM To: GPB, Prod Opt TL; McMains, Stephen E (DOA) Cc: Williamson, Mary J (DOA); GPB, Environ TL; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; Kruger, Dale 0; GPB, Area Mgr Full Field; Buckbee, Rachel A; GPB, Area Mgr Central (GC1 /3 /FS3); GPB, FS3 OTL; GPB, GC3 OTL Subject: GPB flaring events 8/23 To: Steve McMains, AOGCC Cc: Jane Williamson, AOGCC steve.mcmains @alaska.gov jane.williamson @ alaska.gov 907 - 793 -1241, fax 907 - 276 -7542 907 - 793 -1226 From: James Chesher, GPB Production Optimization Team Leader This note provides information on the following flare event: Gaslift compressor maintenance at FS3 8/23 An extended flaring event took place at FS3 starting at 08/23/2008 01:00 and stopping at 08/23/2008 03:00 with a volume of 800 (MSCF). The event lasted for 120 minutes. This was in preparation for planned maintenance on gaslift compressor 1806. X -pad depressurization for pigging and other maintenance, GC3 8/23 An extended flaring event took place at GC3 starting at 08/23/2008 01:42 and stopping at 08/23/2008 04:17 with a volume of 185 (MSCF). The event lasted for 155 minutes. This was to depressure the LDF to X -pad in preaparation for work to repair a choke, and to carry out smart pigging of the LDF. Please contact me if you have any questions. Best regards James ++++++++++++++ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ++ James Chesher (alternate: Dwight Warner) GPB Production Optimization Team Leader external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 441 5130 8/25/2008 RE: GPB flaring events 8/18, 8/19 - correction Page 1 of 1 McMains, Stephen E (DOA) From: GPB, Prod Opt TL [GPBProdOptTL @BP.com] Sent: Wednesday, August 20, 2008 1:11 PM To: GPB, Prod Opt TL; McMains, Stephen E (DOA) Cc: Williamson, Mary J (DOA); GPB, Environ TL; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Area Mgr Full Field; Buckbee, Rachel A; GPB, Area Mgr Central (GC1 /3 /FS3); GPB, GC3 OTL Subject: RE: GPB flaring events 8/18, 8/19 - correction Correction - dates for the flaring event were 8/19 -8/20. Apologies for any confusion this may have caused. James From: GPB, Prod Opt TL Sent: Wednesday, August 20, 2008 12:41 PM To: GPB, Prod Opt TL; 'McMains, Stephen E (DOA)' Cc: 'jane.williamson @alaska.gov'; GPB, Environ TL; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John; GPB, Area Mgr Full Field; Buckbee, Rachel A; GPB, Area Mgr Central (GC1 /3 /FS3); GPB, GC3 OTL Subject: GPB flaring events 8/18, 8/19 To: Steve McMains, AOGCC Cc: Jane Williamson, AOGCC steve.mcmains @alaska.gov jane.williamson @alaska.gov 907 - 793 -1241, fax 907 - 276 -7542 907 - 793 -1226 From: James Chesher, GPB Production Optimization Team Leader This note provides information on the following flare events: GC3 wet gas compressor shutdown 8/18, 8/19 8/19, 8/20 An extended flaring event took place between 21:48 8/18 and 03:40 8/19, 352 minutes in total. Volumes were 2200 MSCF 8/18 and 1250 MSCF 8/19. The event was due to an MEG leak that caused the failure of electrical switchgear for the K5500 wet gas compressor. The machine was restarted successfully. Please don't hesitate to contact me if you have further questions. James ++++++++++++++ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ++ James Chesher (altemate: Dwight Warner) GPB Production Optimization Team Leader external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 441 5130 8/20/2008 I . STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4. Operator 5. MonthA'ear of Disposition 0290000033 PBU GC 3 PBU - WOA BP September - 2008 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 0 11. Used for lease operations (specify in Remarks) 451,349 12. Other (see instructions) 0 Authorization >1 hr: MCF Safety 13. TOTAL VOLUME (ITEMS 6 -12) 451,349 MCF Lease Use 14. NGL Gas Equivalent 0 MCF Conservation 15. Purchased gas 0 Waste: MCF 16. Transferred from: 0 Commissioner Date 17. Transferred to: (Express as a negative #) CGF - 22,735,214 18. Remarks: Block 11: Fuel Gas = 451,349 mscf and Assist Gas = 0 mscf I hereby certi that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be Signature � _..... Title Manager, Production Taxes and Royalty corrected to pressure of 14.65 psia Q � and to a temperature of 60o F. Printed Name Paul D. Syring Phone (907)564 -5028 Date tO \t \ ®p Authority 20 AAC25.235. Form 10 -422 Rev. 1/2004 Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -3 GAS FLARING INCIDENT REPORT Page 9 September 2008 (Unplanned Events Tess than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which Not required for unplanned events which are Tess than or equal to 1 hour are less than or equal to 1 hour TOTAL 0 (Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 (Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 `Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 15,635 Assist 0 TOTAL FLARED VOLUME 15,635 10/8/2008 10:49 AM r STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition 0290000033 PBU GC 3 PBU - WOA BP October -2008 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 3,919 9. Flared or vented more than 1 hour (see instr.) 16,406 10. Pilot and Purge 12,226 11. Used for lease operations (specify in Remarks) 515,615 12. Other (see instructions) 0 Authorization >1 hr: MCF Safety /G) 410t 13. TOTAL VOLUME (ITEMS 6 -12) 548,166 MCF Lease Use 14. NGL Gas Equivalent 0 MCF Conservation 15. Purchased gas 0 Waste: MCF 16. Transferred from: 0 f 3 Co issioner Date 17. Transferred to: (Express as a negative #) CGF - 26,964,196 18. Remarks: Block 11: Fuel Gas = 515,615 mscf and Assist Gas = 0 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be Signature Title Manager, Production Taxes and Royalty corrected to pressure of 14.65 psia � and to a temperature of 60o F. Printed Name Paul D. Syring Phone (907)564 -5028 Date ( l V 1 L ?� Authority 20 AAC25.235. Form 10 -422 Rev. 1/2004 Submit in Duplicate t BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -3 GAS FLARING INCIDENT REPORT Page 12 October 2008 (Unplanned Events less than or equal to 1 hour DATE TIME : VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION T AKEN TO ELIMINATE CAUSE 10/6/2008 1039 -1130 708 Not required for unplanned events which Not required for unplanned events which 10/13/2008 1220 -1316 2,450 are less than or equal to 1 hour are less than or equal to 1 hour 10/14/2008 1555 -1613 288 1015 -08 0548 -0608 347 10/20/2008 1314 -1327 126 TOTAL 3,919 (Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 10/14/2008 2100 -2213 11,406 See Attachments See Attachments 10/18/2008 1047 -2047 5,000 TOTAL 16,406 (Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 (Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 3,919 Unplanned Events > 1 Hour 16,406 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 1Z226 Assist - 0 TOTAL FLARED VOLUME 32,551 11/11/2008 10:16 AM Flare Start Date 10/1/2008 Flare End Date 10/31/2008 GC3 Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Bik Smoke Planned Reported By Volume (MSCF) 08 -509 Flare Relief 10/14/2008 9:00:00 PM 10:13:00 PM 73 minutes No No No BP1 \CLARKTL 11406 Determination Cause High gas transit line pressure caused by CGF shutdown due to utility power outage. Action Taken WOA reduced production rates equaling 1400 mmscfd. EOA reduced production rates equaling 1600 mmscfd. Wells were shut -in or choked back starting at 21:00 hours. 08 -524 Flare Relief 10/18/2008 10:47:00 AM 8:47:00 PM 600 minutes No No No BP1 \MOMAMD 5000 Determination Cause Multiple electrical and instrument problems due to UPS power issues. K -5500 tripped offline. Added assist gas to mitigate black smoke flaring Action Taken Re -start K -5500 after trobleshooting and resolving power and instrument issues. GPB Gas flaring event Page 1 of 1 McMains, Stephen E (DOA) From: GPB, Prod Opt TL [GPBProdOptTL @BP.com} Sent: Wednesday, October 15, 2008 9:57 AM To: McMains, Stephen E (DOA) Cc: Williamson, Mary J (DOA); GPB, Environ TL; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; GPB, Operations Manager; GPB, Environ Advisor West; GPB, Environ Advisor East; GPB, Area Mgr Full Field; Buckbee, Rachel A; GPB, Area Mgr Central (GC1 /3 /FS3); GPB, Area Mgr West (GC2/WRD); GPB, Area Mgr East (FS1 /2 /COTU /Seawater); GPB, Area Mgr North (Gas Plants /GPMA); GPB, GC1 OTL; GPB, GC2 OTL; GPB, GC3 OTL; GPB, Gas Plants CGF OTL; GPB, FS1 OTL Subject: GPB Gas flaring event To: Steve McMains, AOGCC Cc: Jane Williamson, AOGCC steve.mcmains @alaska.gov jane.williamson @alaska.gov 907 - 793 -1241, fax 907 - 276 -7542 907 - 793 -1226 From: James Chesher, GPB Production Optimization Team Leader Extended flaring events took place at Prudhoe Bay on 10/14/08. This was caused by a loss of electrical power to the CGF utilities section at approximately 20:58, which caused the tandems and booster compressors to shut down on high lube oil temperature. This increased the transit gas pressure, and several facilities (listed below) were forced to flare. Rate was reduced by shutting in high gas wells until CCP could handle the gas load from the field. The cause of the electrical shutdown is under investigation. CGF began coming back online at approximately 00:10, and was fully operational by approximately 09:00 on 10/15/08. GC1 at 10/14/2008 starting at 21:04 and stopping at 10/14/2008 22:02 with a volume of 7048 (MSCF). The event lasted for 58 minutes. GC2 at 10/14/2008 starting at 21:07 and stopping at 10/14/2008 21:20 with a volume of 226 (MSCF). The event lasted for 13 minutes. GC3 at 10/14/2008 starting at 21:00 and stopping at 10/14/2008 22:13 with a volume of 11406 (MSCF). The event lasted for 73 minutes. FS1 at 10/14/2008 starting at 21:00 and stopping at 10/14/2008 21:55 with a volume of 2022 (MSCF). The event lasted for 55 minutes. CGF at 10/14/2008 starting at 21:15 and stopping at 10/14/2008 23:00 with a volume of 93668 (MSCF). The event lasted for 105 minutes. Plase contact me if you have any questions. James ++++++++++++++ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ++ James Chesher (alternate: Dwight Warner) GPB Production Optimization Team Leader external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 441 5130 10/15/2008 GPB Gas Flaring event Page 1 of 1 McMains, Stephen E (DOA) From: GPB, Prod Opt TL [GPBProdOptTL @BP.com] Sent: Sunday, October 19, 2008 9:03 PM To: McMains, Stephen E (DOA) Cc: Williamson, Mary J (DOA); GPB, Environ TL; GPB, Environ Advisor West; Benson, Gary A; Pfeiffer, Jim A; GPB, Area Mgr Full Field; Buckbee, Rachel A; GPB, Operations Manager; GPB, Prod Opt TL; GPB, Area Mgr Central (GC1 /3 /FS3); GPB, GC3 OTL; GPB, Area Mgr West (GC2 /WRD); GPB, GC2 OTL Subject: GPB Gas Flaring event To: Steve McMains, AOGCC Cc: Jane Williamson, AOGCC steve.mcmains @alaska.gov jane.williamson @alaska.gov 907 - 793 -1241, fax 907 - 276 -7542 907 - 793 -1226 From: James Chesher, GPB Production Optimization Team Leader An extended gas flaring event took place at GC3 starting at 10/18/2008 10:47 and stopping at 10/18/2008 20:47 with a volume of 5000 (MSCF). The event lasted for 600 minutes. The cause was by multiple electrical and instrument problems related to problems with the UPS power system. As a result the K -5500 wet gas compressor shut down. Assist gas was added to mitigate black smoke, and water production was reduced to reduce flared volumes. K -5500 was successfully restarted and flaring ceased. An extended gas flaring event took place at GC2 starting at 10/18/2008 15:01 and stopping at 10/18/2008 15:43 with a volume of 233 (MSCF). The event was a black smoke event. This is thought to be due to a leak into the fuel gas system. Assist gas was used to stop black smoke. The leak is being troubleshooted, and a replacement valve is ordered and due for delivery imminently. Please contact me if you have any questions. James ++++++++++++++ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ++ James Chesher (alternate: Dwight Warner) GPB Production Optimization Team Leader external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 441 5130 I I 10/20/2008 a r STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition 0290000033 PBU GC 3 PBU - WOA _ BP November -2008 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 14,752 9. Flared or vented more than 1 hour (see Instr.) 9,960 111. Pilot end Purge 9,245 i : .. ,'- for lease a„se ons (specify in Remarks) 532,068 - r air 12. ?ther , nstrta;. t). asp 0 � MCF Authorization >1 hr: _ �k - - Safety 1. TC?"AL VOL WE (IT=MS 6 -72) 566,025 MCF ' /%� — " —. .- Lease Use N!G s; _quisialeot 0 ____ "_ - Conservation MCF - ^a• °eri pas 0 Waste: MCF / ( /I LL corn issioner Tr t.. pr re'o ,Fxe?ss a negat;. #) CGF -26,951,854 Date i ; marks: Block I.: . i Gas , - r. >2,068 mscf and Assist Gas = 0 mscf i! -.rebT,r-'ify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be Cignai,;re \ k AI Title Manager, Production Taxes and Roy It 9 Y Y corrected to pressure of 14.65 psis Printed Natf:c Paul ". Sy - r1 Phone 907)564 -5028 Date /D- a n d to a temperature . 35. F. --� — Authority 20 AAC25.235. Form 10 -422 R9v. 1 !2004 Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING INCIDENT REPORT Page 9 November 2008 Un • lamed Events less than or e • ual to 1 hour DAT TME - : VOLUME DESCRIPTIOWOFINCIDEarlk CAUSE ACTION A N. TaiELIMINATE. CAUSE: 11/8/2008 0635-0700 1,736 Not required for unplanned events which Not required for unplanned events which 11/8/2008 1151-1224 2,292 are less than or equal to 1 hour are less than or equal to 1 hour 11/8/2008 1656-1713 1,181 11/13/2008 1410-1415 1,066 11/20/2008 1911-1948 7,708 11/23/2008 1733-1804 215 11/29/2008 2236-2250 554 TOTAL 14,752 !Unplanned Events greater than 1 hour P4174 ' .. . . . . . . . .. . • . ::--ACTIONTAKENTqatIVIINATE;CAUPE " See Attachments See Attachments TOTAL Lama; Events Les Than or Equal 1 Hour AND Not Exceeding 5000 Mcf .0ATET TtME VOLUME DESPIFWTION: (*INCIDENT-Ai:CAUSE " ACTION TAKEN TO Ul.MINATE. PAUSE': : • - See Attachments See Attachments TOTAL 0 P1E=n ec.. ven Ets Exceedin-,- 1 Hour OR Exceedin • 5000 Mcf . • 4T TME • ,,-.- ::'• - :' -- .y.o4iume:: . :q.: - :PESPRIPTION:PFINCIPENT . :4::PAUSE: . . .. :;-:•AIPTIONTAKEN70:ELIMINAM-CAUSE 2000-2?5P 9,960 See Attachments See Attachments OTAL 9,960 TOTAL ' ient < 1 14,752 > 1 1e1- Plarrnd =, 1 hour aff.liw,)1 0 exceedfr 7:100 MCF FiennPri_ > 1 hour or 9,960 41 TrfrAi.*Jt ARED VOLUME 12/10/2008 8:02 PM Flare Start Late 11/1/2008 flare End Date 11/30/2008 GC3 Flare Report Time Of Flaring Report System Date Start Time Stop Time Duration Intermit'nt Bik Smoke Planned Reported By Volume (MSCF) 08 -586 Ctrld Blowdwn 11/13/2008 8:00:00 PM 11:59:00 PM 239 minutes No No Yes BP1 \KILTYKC 9960 Determination Cause Controlled blow -down, X pad produced water lines. Action Taken Controlled blow -down, complete. V -- - - - 1 tAbV 1 .J1 1 McMains, Stephen E (DOA) From: GPB, Prod Opt TL [GPBProdOptTL @BP.com] Sent: Saturday, November 15, 2008 1:52 PM To: McMains, Stephen E (DOA) Cc: Williamson, Mary J (DOA); GPB, Environ TL; Benson, Gary A; Pfeiffer, Jim A; GPB, Operations Manager; GPB, Environ Advisor West; GPB, Area Mgr Full Field; Buckbee, Rachel A; GPB, Prod Opt TL; GPB, Area Mgr Central (GC1 /3 /FS3); GPB, GC3 OTL Subject: Gas flaring event at GC3 To: Steve McMains, AOGCC Cc: Jane Williamson, AOGCC steve.mcmains @alaska.gov jane.wiiliamson @alaska.gov 907 - 793 -1241, fax 907 - 276 -7542 907 - 793 -1226 From: James Chesher, GPB Production Optimization Team Leader An extended flaring event took place at GC3 starting at 11/13/2008 20:00 and stopping at 11/13/2008 23:59 with a volume of 9960 (MSCF). The event lasted for 239 minutes. This was due to controlled blowdown of the X -pad produced water line, which had been shut -in and swept with gas to allow for corrosion inspections. Please contact me if you have any questions. James ++++++++++++++ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ++ James Chesher (alternate: Dwight Warner) GPB Production Optimization Team Leader external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 441 5130 11/17/2008 1 McMains, Stephen E (DOA) From: GPB, Prod Opt TL [GPBProdOptTL @BP.com] Sent: Saturday, November 22, 2008 10:53 AM To: GPB, Prod Opt TL; McMains, Stephen E (DOA) Cc: Williamson, Mary J (DOA); GPB, Environ TL; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; GPB, Operations Manager; GPB, Environ Advisor West; GPB, Area Mgr Full Field; Buckbee, Rachel A; GPB, GC3 OTL; GPB, Area Mgr Central (GC1 /3 /FS3) Subject: GPB Gas Flaring Event at GC3 To: Steve McMains, AOGCC Cc: Jane Williamson, AOGCC steve.mcmains @alaska.gov jane.williamson @alaska.gov 907 - 793 -1241, fax 907 - 276 -7542 907 - 793 -1226 From: Dwight Warner, GPB Production Optimization Team Leader An extended flaring event occurred at GC3 on November 20 when the LPS compressor K -7000 shutdown due to a failed fuel gas valve. Production rates were reduced and 21 wells shut -in equaling 235 mmscfd gas. Repairs were made to the valve and the compressor was back on line during the evening hours on November 21st. The flaring began at 19:11 and ended at 19:48 (37 minutes), total volume flared was 7708 MSCF. If you require additional information, please don't hesitate to call me. Dwight Warner GPB Production Optimization TL (907) 659 - 5566/4472 11/24/2008 • S STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4. Operator 5. MonthPiear of Disposition 0290000033 PBU GC 3 PBU - WOA BP December -2008 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 9,770 11. Used for lease operations (specify in Remarks) 558,661 12. Other (see instructions) 0 Authorization >1 hr: MCF Safety 13. TOTAL VOLUME (ITEMS 6 -12) 568,431 MCF Lease Use 14. NGL Gas Equivalent 0 MCF Conservation 15. Purchased gas 0 Waste: MCF 16. Transferred from: 0 Commissioner Date 17. Transferred to: (Express as a negative #) CGF - 27,540,926 18. Remarks: Block 11: Fuel Gas = 558,661 mscf and Assist Gas = 0 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be Signature Title Manager, Production Taxes and Royalty corrected to pressure of 14.65 psia and to a temperature of 60o F. Printed Name Paul D. Syring Phone (907)564 -5028 Date t 0 Authority 20 AAC25.235. Form 10 -422 Rev. 1/2004 Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -3 GAS FLARING INCIDENT REPORT Page 10 December 2008 (Unplanned Events Tess than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which Not required for unplanned events which are Tess than or equal to 1 hour are Tess than or equal to 1 hour TOTAL 0 (Unplanned Events greater than 1 hour DATE TIME VOLUME . DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME :: : VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 9,770 Assist 0 TOTAL FLARED VOLUME 9,770 1/9/2009 2:01 PM