Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutBadami Gas DispositionState of Alaska AOGCC Gas Disposition Files Year: 2013 Facility: Badami Operator: SAVANT Ferguson, Victoria L (DOA) From: Zane Henning < Zane. Henning @savantalaska.com> Sent: Monday, July 07, 2014 7:09 AM To: Ferguson, Victoria L (DOA) Subject: RE: Badami flaring events over an hour Follow Up Flag: Follow up Flag Status: Flagged Victoria, Further our conversation and your follow up email: 1. Our annual PM's on each Injection Gas (IG) compressor generally occur in the summer of each year. We do have the option to perform heavy maintenance on either IG compressor anytime in the year since we have two machines. Lube oil usage and discharge temperatures currently drive maintenance inspections. 2. In the past we have monitored oil usage on distance pieces as criteria on when perform maintenance on packings. 3. Several items can effect gas bypass on packings including operating pressure, injection pressure, operating temperature and overall run time on the compressor. Since my last email, we continue to research ideas on monitoring gas bypass on packings. My Plant Engineer is looking into installing window sight flow indicators on each cylinder distance piece vent line of the compressors so we can monitor gas flow on our daily rounds. Let me know if you need any other information. Regards, Zane From: Ferguson, Victoria L (DOA)[mailto:victoria.ferguson@alaska.gov] Sent: Tuesday, June 24, 2014 9:15 AM To: Zane Henning Subject: RE: Badami flaring events over an hour Zane, In our conversation on 6/10/14 you described timing of maintenance, packings wear/gas bypass increasing, temperature effects on packing, timing of turnarounds, etc. Could you please write a paragraph explaining these issues and the effects on flaring. Thanx, Victoria Victoria Ferguson Senior Petroleum Engineer State of Alaska Oil & Gas Conservation Commission 333 W. 7th Ave, Ste 100 Anchorage, AK 99501 Work: (907)793-1247 victoria.ferouson cDalaska.goy CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Ferguson at (907(793-1247 or Victoria.FerausonQalaska qov From: Zane Henning (mailto:Zane.Henning ansavantalaska coml Sent: Friday, June 13, 2014 2:30 PM To: Ferguson, Victoria L (DOA) Cc: Wayne Kuykendall; CardnoSally Ryan Subject: Badami flaring events over an hour Victoria, Per our conversation this week, I have attached the Modification of Change (MOC) that was performed by BP in 2010 before Savant assumed control at the Badami Unit. It shows how the distance piece vents on the Injection Gas (IG) compressors have had the case vent lines plumbed directly to the Low Pressure (LP) flare header versus going to atmospheric roof vents. Two tests in have been performed, one in 2012 and one in 2013 to ensure that the IG compressors are the source of the flare gas we are seeing in the reports. Our Instrument Tech installed a vent hose off the LP drain hear downstream of the distance piece vent header and closed the block valve going to the LP flare. Once the block valve was closed, the gas flaw to flare stopped. From these tests, it was determined to include the language you see in the flare reports "Small, LP flare volume coming from the IG compressors packing case vents". Please see trend we created from ambient air temps and daily flare gas volume. Let's discuss when you have a moment. Goode Trend: Flare We have started a new work order to track down which cylinders are producing the most vent gas to flare so we quantify which cylinders are venting the most gas. 1 want to close with making sure you understand we are not purposely flaring gas to increase throughput of oil. We have limited gas at Badami to begin with and have to purchase fuel gas from Endicott at certain times. Thanks for bringing this matter to our attention and I will be sure to get back with you once our trouble shooting is complete. Regards, Zane Henning North Slope Operations Manager Alternate: Wayne Kuykendall NS Office: 907.659.1349 Cell: 907.830.7491 Harmony: 5506 Email: Zane.HennineCcDSavantAlaska.com SAVANT ALASKA Savant Alaska LLC. The contents may be privileged and confidential and are intended for the use of the intended addressees) only. If you are not an intended addressee, note that any disclosure, copying, distribution, or use of the contents of this message is prohibited. If you have received this e-mail in error, please delete the message from your mailbox and system, then contact me at 907-830-7491 or by email at Zane. Henning@SavantAlaska.com. Thank you. Creator: Johnson Larry 2014-01626 ork rder etails ALASKA Approver position: Maintenance Lead / Planner Contact/Requestor: Henning Zane Priority: 2. Important Asset: Badami WO source: O&M Description: IG -Compressors - Investigate gas discharge from the distance pieces to the flare and establish method to monitor the flow rates. Functional area: Operations and Maintenance Work order type: Regulatory Status: Approved Comments: Date and time from: 6/13/2014 12:00:00 AM Date and time to: 6/30/2015 12:00:00 AM TASKS 'Task # Position Estimated—We—created Date Closed Title Cost code Equipment - l hours 01, Plant Mechanic 24.0 06/13/2014 IG -Compressors - Investigate gas discharge from the distance pieces, 03-000-000-900-1 GAS COMPRESSION to the flare and establish method to monitor the flow rates - Plant Mechanic - Install vent hose for testing and assist with testing as required Instructions: Install hose to vent gas outside to bleed trailer for testing during suspected flare events.Assist with testing as required 'ompressors - Investigate gas discharge from the distance pi to the flare and establish method to monitor the flow rates. - Engineer GAS Page 1 of 2 Generated by Savant App / www.savantalaska.com Technical issues: Tex R Us LLC Qa 248.3978 Instructions: Investigate the flaring from the distance pieces. Determine proper monitoring method for flow monitoring of the gas coming out of the distance pieces. Possibly install wireless flow meter on all of the distance pieces for both IG Compressors. This would allow for better monitoring of where the gas is being vented from and allow for quicker, more precise maintenance practices. 03 Multi Skilled Plant 12. 06/13/201 IG -Compressors - Investigate gas discharge from the distance pieces 03-000-000-900-1 GAS COMPRESSION Operator to the flare and establish method to monitor the flow rates. - MSO - the troubleshooting as MATERIALS Catalog Id Description QTY in whse - QTY Date needed Cost code needed EQUIPMENT Catalog Id Tag Id Name Begin End usage Comments usage date date MOD -M300 i GAS COMPRESSION - I IG -Compressors - Investigate gas discharge from the distance pieces to the flare and establish method to monitor the flow rates. OTHER COSTS TIMESHEETS Page 2 of 2 Generated by Savant App / www.savantalaska.com Technical issues: Tex R Us LLC @ 248.3978 Scope of work Badami IGA, IGB and VRU Distance piece, packing case vent and drain line piping change IGA-IGB 1. Add %"piping from the top of each compressor distance piece to a main 1 %a°' vent line that will run along the base of the compressor to the 1 ' stage blowdown flare header. 2. Add %:" piping from the packing case vent to the main vent header that will run along the base of the compressor. See drawings: PI-BO-CO0016 sheet 005 BDMI-M300 PI -BO -CO -0015-06 sheet 001 3. In the vent line add two block valves and a check valve for isolation during maintenance work. 4. Use the existing flanges from the 1st stage blowdown header and re -locate the two block valve that are normal closed to the upstream side of the header. 5. Add two elbows with flanges to relocate the existing blowdown valves. 6. Add a tee to connect both the new vent line header and the blowdown line to the flare line 7. Add block valves to each line from the distance piece drain lines that will be normally closed; these will be opened daily by operations to drain liquids from the distance pieces. 8. Demolition all the stainless % tubing that is associated to the vent lines and separate the drain lines from the vent line system. VRU 1. Add '/2" piping to the packing case vents and run a new vent header pipe to a tee that can be installed were the flange connects to line 6" —F-123-AA1.3 ,which is not shown on the drawing see BDMI-M300 PI -BO -CO 0014-06 sheet 001 Vent line to flare line header PI -BO -CO -0014 -sheet 004 2. Add block valves to the drain lines from the distance piece on each cylinder. Note: All piping sizes need to field verified from the compressor distance piece to the flare line header. It would be preferred to use threaded piping connections if the BP piping specification allow. liz STATE OF ALASKA ALASKA OILAND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRomm=n r_ec nicor%arri %ki - 7. Facility Number Z. Facility Name 290000019 gt Disposition — - - -------- 3. Field Badami Volume MCF v .avI vV, I IVe• 4. O ra(or Pe 5. Month ear of Dn-13 ion Savant Alaska LLC Jan -13 20. For production from mulls le p pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 7. Reinjected 799 Pool Name Pool Code Percent Badami 60100 98.30% S. Flared or vented 1 hour or less 295 Badami, Oil Undefined 60150 3.70 100.00% 9. Flared or vented mom than 1 hour (see mstr) 1,742 10. Pilot and Purge 403 11. Assist Gas 12. Fuel gas used in lease operations. 1,109 13. Other (see instructions) ORaal Use Only Authorization>7 he Safety / 7T� MCF 14. TOTAL VOLUME (ITEMS 6-13) 4,348 15. NGL Gas Equivalent Lease Use MCF 18. Purchased gas 15.892 Conservation MCF lNasfe: MCF 17. Transferred from: ^ / 18. Transferred to: (Empress as a negative #) Commissioner Date 19. Remarks: 1 hereby cenify that the foregoing is We and torted to the best of my kI Iry Ige. signaturej� �, l/ r / Note: All volumes must be co":0 to e Title vice President pressure of 14.65 Asia and to a ' temperature of 60o F. Authority 20 Printed Name William J. Martinez III Phone 720-328-7182 DateAAC25.235. Folin 10-422 2%9113 January 2013 production allomtien.xisx AOGCC Facility Report .3 /Zf/ f3 vZ-�-- Unplanned Events Less Than or Equal To 1 Hour tart Imet,nd I Ime End Date I Plannedme DESCRIPTION OF INCIDENT AND CAUSE CTION TAKEN TO ELIMINATE CAUSE 1/11135:36 20:18 1/1/13 U 102 vents vent gas into the packing case 1/1/13 2:48 5:12 111/13 U 3 vents vent gas into the packing case TOTAL 114/13 7:54 11:06 1/4/13 U 9 vents vent gas into the packing case 1/5/13 Not required tor events which are less t an or 23:59 1/5/13 U 61 295 Not required for events which are less than or equal to 1 hour I equal to 1 hour Events Greater Than 1 Hour UAIL rt Time End Time End Date Fiannert VOLUML tMCt)DESCRIPTION OF INCIDENTAND CAUSE ACTION TAKEN TO ELIMINATE CAUSE 1/11135:36 20:18 1/1/13 U 102 vents vent gas into the packing case 1/1/13 2:48 5:12 111/13 U 3 vents vent gas into the packing case 1/4/13 12:06 13:12 1!4/13 U 2 vents vent gas Into the packing case 114/13 7:54 11:06 1/4/13 U 9 vents vent gas into the packing case 1/5/13 16:00 23:59 1/5/13 U 61 vents vent gas Into the packing case 1/5/13 1130 14:36 1/5/13 U 9 vents vent gas into the packing case 1/6/13 19:36 23:59 1/6/13 U IS vents vent gas into the packing case 1/6/13 17:12 19:30 1/6/13 U 7 vents vent gas into the packing case 1/6/13 0:00 12:24 1/6/13 U 36 vents vent gas into the packing case 1/7/13 8:48 23:59 1/7/13 U 48vents vent gas into the packing case 1/7/13 0:00 754 1/7/13 U 24 vents vent gas into the packing case 1/8/13 0:00 2359 1/8/13 U 94 vents vent gas into the packing case 119/13 19:06 2359 1/9/13 U 17 vents vent gas Into the packing case 1/9/13 17:24 19:00 1/9113 U S vents vent gas into the packing case 1/9/13 11:30 13:00 1/9/13 U 5 vents e I IS S In a, upeldipull on vent gas into the packing case 1/9/13 090 11:06 1/9/13U 43 vents vent gas into the packing case 1/10/13 8:30 23:59 1/10/13 U 51 vents vent gas into the packing case 1/10/13 0:00 7:00 1/10/13 U 22 vents ven t gas into the packing case 1/11/13 0:00 2359 1/11/13 U 81 vents vent gas into the packing case 1/12/13 0:0018:48 1/12/13 U 185 vents vent gas intothepackin g case January 2013 production allocation.xlsx, AOGCC Flaring report 1/13/13 19:06 22:06 1/13/13 U 157 ant SD—PL Issue Troubleshooting PLC System 1/13/13 13:06 14.24 1/33/13 U 3 vents vent gas into the packing case 1/13/13 4:54 6:30 1/13/13 U 10 vents vent gas into the packing case 1/21/13 14:36 2359 1/21/13 U 29 vents vent gas into the packing case 1/22/13 DOD 2359 1/22/13 U 71 vents vent gas into the packing case 1/23/13 0:00 2359 1/23/13 U 70 vents vent gas into the packing case 1/24/13 0:00 2359 1/24/13 U 73 vents vent gas into the packing case 1/25/13 0:00 2359 1/25/13 U 88 vents vent gas into the packing case 1/26/13 0:00 23:59 1/26/13 U 81 10 tu I 31.00M vents is 0,121110M, vent gas into the packing case 1/27/13 0:00 23:59 1/27/13 U 96 5111al, CP vents vent gas into the packing case 1/28/13 0:00 2359 1/28/13 U 89 vents vent gas into the packing case 1/29/13 0:00 2359 1/29/13 U 70 vents vent gas into the packing case 1/30/13 0:00 23:59 I/30/13 U 86 vents vent gas Into the packing case TOTAL 1,74 Planned Events less Than or Equal To 1 Hour ANO Not Exceeding 5,000 mcf rt Time n me n Date Plannedme IN DESCRIPTION OF INCIDENT 7M CAUSE CTION TAKEN TO ELIMINATE CAUSE TOTAL Not required for planned events which are less than or equal Not required for planned events which are less to 1 hour than or equal to 1 hour Panned Events Exceeding 1 Hour OR Exceeding 5,000 me DAM 15tartrime EndTme End Date MaFnecl VOWME (mcf)DESCRIPTION OF INCIDENT AND CAUSE[ACTION TAKEN TO ELIMINATE CAUSE TOTAL G"NOTOTAL 2,037 January 2013 production allotation.xin, ADGCC Flaring report STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRonurFn re -q nmOnciTinu ---- 1. Facility Number 2. Facility Name 290000019 at Disposition -- - --------..v.... 3. Field Becalm Volume MCF VVIlIl I� 4. Operator 5. Mcnthlyear of Disposition Savant Ataska LLC I Feb -13 20. For production from multiple pools, list contribution of each pool as a percent or Total Volume, 6. Sold Pool Name Pool Code Percent 7 Reinjected 76 Badami 60100 96.27% Badami, Oil Undefined 60150 3,730 B. Flared or vented 1 hour or less 104 100.00' 9 Flared or vented more than 1 hour (see instr.) 2,078 10. Pilot and Purge 364 11. Assisi Gas 12. Fuel gas used in lease operations. 700 13. Other (see Instructions) Official Use Only Authorization hr: Safety �i f 7S f D MCF 74. TOTAL VOLUME (ITEMS 6-13) 3,323 Lease Use MCF 15. NGL Gas Equivalent Conservation MCF t6. Purchased gas 75.458 Waste: MCF 17 Transferred from'. Commissioner Date 18 Trarsfemed to: (Express as a negative 0) 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected to Signature ��,11 li,� _ rile Vice President pressure Of 14.65 psis and to a temperature of 600 F Authority 20 Printed Name William J. Martinez III Phone 720-326-7182 Date 3120113 AA C25.235. Fnr 1n -d99 February 2013 production allocation.xlsx AOGCC Facility Report VLA 312-9 /13 Unplanned Events Less Than or Equal To 1 Hour DATE Start Time End Time End Date Planned I VOLUME (mcf) I ESCRIPTION OF INCIDENT AND CAUSE CTION TAKEN TO ELIMINATE CAUSE End Date TOTAL Not required for events whit are esst an or 104 Not required for events which are less than or equal to 1 hour equal to 1 hour Events Greater Than 1 Hour DATE Start Time End Time End Date Planned VOLUME (mcf) DESCRIPTION OF INCIDENT AND CAUSE ACTION TAKEN TO ELIMINATE CAUSE Small, LP flare volume coming from the IG compressors packing case This is normal operation for the compressors to 2/5/1 6:1 23:5 2/5/13 U 42 vents vent gas into the packing case Small, LP flare volume coming from the IG compressors packing case This is normal operation for the compressors to 2/6/1 0:0 23:5 2/6/13 U 58 vents vent gas into the packing case Small, LP flare volume coming from the IG compressors packing case TF7 T7is normal operation for the compressors to 2/7/1 O:OC 23:5 2/7/13 U 64 vents vent gas Into the packing case Small, LP flare volume coming from the IG compressors packing case This is normal operation for the compressors to 2/8/1:116:4 23:0 2/8/13 U 115.verts vent gas into the packing case Small, LP flare volume coming from the IG compressors packing case This is normal operation fort a compressors to 2/8/1 14:5 16:2 2/8113 U 3 vents vent gas into the packing case Small, LP flare volume coming from the IG compressors packing case This is normal operation for the compressors to 2/8/1 0:00 3:0 2/8/13 U 7 vents vent gas into the packing case Small, LP flare volume coming from the IG compressors packing case This is normal operation for the compressors to 2/11/1 22:1 23:59 2/11/13 U 5vents vent gas Into the packing case IG -A COmDr. 00wn due to unknown causes theproblein is still under 2/11/1 15:42 22:12 2/11/13 U 363 review Investigation ongoing to eliminate the problem Small, LP flare volume coming from the IG compressors packing case This is normal operation for the compressors to 2/12/13 21:0 23:5 2/12/13 U vents vent gas into the packing case Small, LP flare volume coming from the lG compressors packing case This is normal ope,atlon for the compressors to 2/12/1 4:2 14:0 2/12/13 U 22 vents vent gas into the packing case Small, LP flare volume coming from the IG compressors packing case This is normal operation for the compressors to 2/12/13 0:0 1:2 2/12/13 U 91 vents vent gas into the packing case Small, LP Flare volume comingfrom the IG compressors packing case This is normal operation forthe compressors to 2/13/13 20:4 22: 2/13/13 U 2 vents vent gas into the packing case Small, LP flare volume coming from the IG compressors packing case This is normal operation for the compressors to 2/13/13 0:4 18:4 2/13/13 U 45 vents vent gas into the packing case Small, LP flare volume coming from the IG compressors packing case This is normal operation for the compressors to 2/14/13 4:1 15:5 2/14/13 U 3 vents vent gas into the packing case Small, LP flare volume coming from the IG compressors packing case This is normal operation for the compressors to 2/14/1 2:5 4:1 2/14/13 U I vents vent gas into the packing case Small, LP flare volume coming from the IG compressors packing case This is normal operation for the compressors to 2/17/13 14:2 23:5 2/17/13 U 27 vents vent gas into the packing rase Small, LP flare volume coming from the IG compressors packing case This is normal operation for the compressors to 2/18/13 0:0 23:5 2/18/13 U 74 vents vent gas into the packing case Small, LP flare volume coming from the IG compressors packing case This is normal operation for the compressors to 2/19/13 0: 16:3 2/19/13 U 59 vents vent gas Into the packing case Small, LP flare volume coming from the TGcompressorspackingcaze This is normal operation for the compressors to 2/19/13 16:4 23:5 2/19/13 U 2 vents vent gas into the packing case Small, LP flare volume coming from the IG compressors packing case This is normal operation for the compressors to 2/20/13 0:0 8:2 2/20/13 li 3 vents vent gas into the packing case february 2013 production allocation.xlsx, AOGCC Flaring report Planned Events Exceeding 1 Hour OR Exceeding 5,000 mcf DATE Start Time End Time I End Date IPlanned 1VOLUME(ni DESCRIPTION OF INCIDENT AND CAUSE CTION TAKEN TO ELIMINATE CAUSE TOTAL 0 IG -e compressor down because of low low PSI and ensuing plant 2/20/13 8:2 13:2 2/20/13 U 163 upset Normaled plant backup. final fixes yet to come Small, LP flare volume coming from the IG compressors packing case This is normal operation for the compressors to 2/20/13 13:2 23:5 2/20/13 U 4 vents vent gas into the packing case Small, LP flare volume coming from the IG compressors packing case This is normal operation for the compressors to 2/21/1 0:0 6:5 2/21/13 U 2 vents vent gas Into the packing case Small, LP flare volume coming from the IG compressors packing case This is normal operation for the compressors to 2/21/13 7:0 17:4 2/21/13 U 44 vents vent gas into the packing case Small, LP flare volume coming from the IG compressors packing case This is normal operation for the compressors to 2/21/13 17:4 23:59 2/21/13 U 26 vents vent gas into the packing case Small, LP flare volume coming from the IG compressors packing case This is normal operation for the compressors to Z/2z/13 0:0 13:45 2/22/13 U 57 vents vent gas Into the packing case Small, LP flare volume coming from the IG compressors packing use This is normal operation for the compressors to 2/22/13 13:4 23:5 2/22/13 U 41 vents vent gas into the packing case Small, LP flare volume coming from the IG mpreisors packing use This is normal operation for the compressors to 2/23/1 0:0 23:5 2/23/13 U 10 vents vent gas into the packing case Small, LP flare volume coming from the IG compressors packing use This is normal operation for the compressors to 2/24/1 0:0 23:5 2/24/13 U 107 vents vent gas Into the packing use Small. LP flare volume coming from the IG compressors packing case This is normal operation for the compressors to 2/25/13 0:0 17:18 2/25/13 U 75 vents vent gas into the packing case Small, LP flare volume coming from the IG compressors packing case This Is normal operation for the compressors to 2/25/1 17:4 23:5 2/25/13 U 27 vents vent gas into the packing case Small, LP flare volume comi ng from the IG compressors packing case This is norma l operation fo r the compressors to 2/26/1 0: 23:5 2/26/13 U 108 vents vent gas into the packing case Small, LP flare volume cc ming from the IG compressors packingcase This is normal operation for the compressors to 2/27/1 0:0 14:22 2/27/13 U 65 vents vent gas into the packing case This was a plant shutdown event caused by a fire 2/27/1 14:2 20:2 2/27/13 U 20 Plant BESD and upset processes alarm indication Small. LP flare volume coming from the IG compressors packing case This is normal operation for the compressors to 2/27/13 20:21 23:5 2/27/13 U 4 vents vent gas into the packing case Small, LP flare volume coming from the IG compressors packing case This is normal operation for the compressors to 2/28/13 1:12 3:5 2/28/1 U 5 vents vent gas into the packing case TOTAL 2,078 Planned Events Exceeding 1 Hour OR Exceeding 5,000 mcf DATE Start Time End Time I End Date IPlanned 1VOLUME(ni DESCRIPTION OF INCIDENT AND CAUSE CTION TAKEN TO ELIMINATE CAUSE TOTAL 0 GRAND TOTAL 1 1 2,183 February 2013 production alloca:ion.�lsa, AOGCC Flaring report STATE OF ALASKA ALASKA OILAND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCFn c,ns nigpnciTenN 1. Facility Number2, Facility Name 290000019 B1 Disposition 3. Field Badami Volume MCF 4. Operator 5. Monthlyear of Disposition Savant Alaska LLC Mar -13 20. Forproduction from multiple pools, list contribution oteach pool as a percent of Tota! Volume. 6, Sold 0 Pool Name Pool Code Percent 7. Reinjected 294 Badami 60100 95.68% Badami, Oil Undefined 60150 4.32% 8. Flared or vented 1 hour or less 314 100.00% 9. Flared or vented more than 1 hour (see instr.) 1,603 10. Pilot and Purge 403 11. Assist Gas 12. Fuel gas used in lease operations. 1.734 13. Other (see instructions) Olffclal Use Only Authorization >1 hr. Safety �3 MCF 14. TOTAL VOLUME (ITEMS 6-13) 4,348 Lease Use MCF 15. NGL Gas Equivalent Conservation MCF 16, Purchased gas 17,554 Waste: MCF 17. Transferred from. 3 —1 T 18. Transferred to: (Express as a negative #) Commissioner Date 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. ;%��i Note: All volumes must be corrected to Signature i/I01 c ) /% Tide Vice President pressure Of 14.65 Asia and to a temperature of 60o F. Authority 20 Printed Name William J. Martinez III Phone 720-328-7182 Dale 4/16/13 AA C25.235. c..r... 1n All March 2013 production allocation.xisz AOGCC Facility Report VIF /,/ialJ3 Law TOTAL 1 1 314 1 Net required for events which are less than or equal to 1 hour Iequal to 1 hour Events Greater Than -iHour DATE Stan Time End Time End Date Planned VOLUME (mcf) DESCRIPTION OF INCIDENT AND CAUSE ACTION TAKEN TO ELIMINATE CAUSE 3/2/13 16:00 18:56 3/2/13 U ] Small, LP flare volume coming from the IG compressors packing case This is normal operatlon for the compressors to vents vent gas into the packing case 3/2/13 19:14 23:59 3/2/13 ❑ Small, LP are volume com mining from the IG compressors packing case This is normal operation for the to ress 11 vents vent gas into the packing case 3/3(13 17:00 20:06 3/3/13 U Small, LP flare volume coming from the ll, compressorspaukingcase This is normal operation for the compressors to 4 vents vent gas i aro the packing case 3/3/13 9:00 10:46 3/3/13 U Small, LP flare volume mining from the IG compressors packing case This is normal operation for the compressors to 3 vents vent gas into the packing case 3/3/13 0:00 8:54 3/3/13 U Small , LP flare volume coming from the IG compressors packing case is is normal operation for the compressors to IB vents vent gas into the packing case 3/4/13 8:09 18:48 3/4/13 U Small, LP Flare volume coming from the IG compressors packing case This is normal operation forthe compressors to 24 ants vent gas into the packing case 3/4/13 5:26 B:OB 3/4/13 U VRU ESD on low suction pressure. Had a hard time getting it We performed some maintenance, cleared some 149 restarted Squid from scrubbers, and restarted 3/5/13 1:42 5:42 3/5/13 Small, LP flare volume coming from the IG compressors packing case This is normal operation or the compressors to U 5 vents vent gas into the packing case 3p/13 14:36 23:59 3/]/13 U 154 Plant issues with PLC being resolved to bring back PIC- 14032nd stage vent to flare to full operation. 3/8/13 12:18 16:06 3/8/13 U Small, LP flare 70lume7OM77g omthe IG compressors packing case This is normal Operationor the compressors to 5 ants vent gas into the packing case 3/8/33 ]:IB 11:18 3/8/13 U Small, LP flare volume coming from the lG compressors packing case This is normal operation forthe compressors to 70 vents vent gas into the packing case 3/8/13 0:00 6:12 3/8/13 U Small, LP flare volume coming from the IG compressors packing case This is normal operation for the compressors to 18 ants vent gas into the packing case 3/9/13 10:54 23:59 3/9/13 U Small, LP flare volume coming from the IS compressors packcase packing case This is norma operation for the compressors to 23 vent gas into the packing case 3/10/13 1144 1 15:36 3/10/13 P 106 VRU manually shut down for maintenance Completed maintenance work & restarted VRU 3/10/13 0:00 20:36 3/10/13 U Small, LP flare volume coming from the IG compressors parking case This Is normal operation for the compressors to 25 vents vent gas into the packing case 3/11/13 12:12 18:18 3/11/13 U Small, LP flare volume com Ing from the IG compressors packi ng case This is normal operation for the compressors to it vents vent gas into the packing case 3/12/13 12:30 23:59 3/12/13 U Small, LP flare volume coming from the IG compressors packing case This is normal operation for Me compressors IO 43 vents vent gas into the packing case 3/13/13 19:42 23:59 3/13/13 U Small. LP are volumecoming from me IG compressorspacking case This is normal operation orthe compressors to 11 vents vent gas into the packing case 3/13/13 16:12 17:24 3/13/13 U Small, LP Flare volume coming from the IG compressors packing case This is normal operation for the compressors to 2 vents vent gas into the packing case 3/13/13 0:00 16:06 3/13/13 U 52 Small, LP flare volume coming from the IG mres mpsos- packing case This is normal operation forthe compressors to vents vent gas into the packing case 3/14/13 22:30 23:59 3/14/13 U 3 Small, LP flare volume coming from the IG compressors packing case Thisls normaloperatlon for the compressors to vents vent gas into the packing case 3/14/13 000 15:06 3/14/13 U 41 Small, lP Flare volume coming from the IG compressors packing case This is normal operation for the compressors to vents vent gas Into the packing case March 2013 production allocation.ales, AOGCC Flaring report 3/15/13 0:00 9:00 3/15/13 U 24 Small, LP flare volume Coming from the IG Compressors packing case This is normal operation forthe compressors to GRANDTOTAL 1,918 vent vent gas into the packing use 3/18/13 22:30 23:59 3/18/13 U Small, LP flare volume coming from the IG compressorspacking case This isnormal operation for the compressors to 2 vents vent gas into the packing use 3/18/13 1012 14:36 3/18/13 U Small, LP flare volume coming from the IG compressors packing case This is normal operation r the compressors to 12 vents vent gas into the packing case 3/18/13 5:06 1006 3/18/13 U Small, LP flare volume coming from the IG compressors p ing Case is is norma operation for the compressors to 31 vents vent gas into the packing use 3/19/13 0:00 23:59 3/19/13 U 72 Small, LP flare volume coming from the IG compressors packing case This is normal operation far t7. compressors to vents vent gas into the packing use 3/20/13 0:00 9:30 3/20/13 U Small, LP are volume coming from the G compressors packing case This is normaloperation ort ecompressors to 29 vents vent gas into the packing use 3(21/13 14:06 19:00 3/21/13 U 9 Smal I, LP flare volume coming from the IG com pressors packing case This is normal operation for the compressors to vents vent gas into the packing use 3(22/13 14:18 23:59 3/22/13 U Small, LP are volume coming from the IG compressors packing case This is normal operation orthe compressors to 32 vents vent gas into the packing use 3/22/13 5:46 10:26 3/22/13 U Small, LP are volume comm ingfrothe lG compressors packi ng case This is normal operation or the compressors to 9 vents vent gas into the packing use 3/23/13 0:00 23:59 3/23/13 U 86 Small, LP flare volume coming from the IG compressors packing case This is normal operation orthe compressors to vents vent gas into the packing use 3/20/13 0:00 23:59 3/24/13 U Small, LP flare volume coming from the IG compressors packing case This isnorma operation or the compressors to 95 vents vent gas into the packing use 3/25/13 0:00 23:59 3/25/33 U Small, LP flare volume coming from the IG compressors packing case This is normal operation for the compressors to 83 vents vent gas into the packing use 3/26/13 0:00 23:59 3/26/13 U 91 Small, LP flare volume coming from the IG compressors packing case This is normal operation or the compressors to vents vent gas Into the packing case 3/2]/13 0:00 23:59 3/D/13 U Small, LP flare volume coming from the IG compressors pack packing case erati This is nwmaI opon r the compressors to 96 vents vent gas into the packing case 3/28/13 0:00 23:59 3/28/13 U Small, LP flare volume coming from the IG c.compressors packing case This is normal operation forthe compressors to 88 vents vent gas Into the packing case 3/29/13 000 23:59 3/29/13 U Small, LP Tare volume coming from the IG compressors packing case Thisisnoeratioor rma opn the compressors to ]9 vents vent gas into the packing case 3/30/13 22:02 23:59 3/30/13 U 3 Small, LP flare volume coon Ing from the IG compressors packi ng case This isnorma operation for the compressors to vents vent gas into the packing case 3/30/13 0:00 19:48 3/30/13 U Small, tP flare volume coming from the IG compressors packing case This is normal operation for the compressorst 51 vents vent gas into the packing use 3/31/13 11:48 16:54 3/31/13 U Small, LP flare volumace ing om the IG compressors packing case This is normaloperation or the compressors to 9 vents vent gas Into the packing case TOTAL 1,603 Planned Events Exceeding I Hour OR Exceeding 5,000 and DATE Start Time End Time I End Date I Panned VOLUME(m DESCRIPTION OF INCIDENT AND PAUSE CTION TAKEN TO ELIMINATE CAUSE TOTAL O GRANDTOTAL 1,918 March 2013 pl.ducV. ailocatgn.visy ADGCC Flaring report STATE OF ALASKA ALASKA OILAND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 200000Dt9 2. Facility Name3. Bi Field Badami 4. Operator Savant Alaska LLC S. MonthNear of Disposition Apr -13 Disposition Volume MCF 20. For production from multiple pools, lest contribution of each pool as a percent of Total volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 646 Badami 60100 96.53% Badami, Oil Undefined 60150 3.479 e. Flared or vented ihour or less 180 00.001 9. Flared or vented more than 1 hour (see instrJ 827 10. Pilot and Purge 390 11. Assist Gas 12. Fuel gas used in lease operations. 1,156 13. Other (see instructions) ._ Official Use Only Authorization >l hr Safety p 2 !l MCF 14. TOTAL VOLUME (ITEMS 6-13) 9,199 Lease Use MCF 15, NGL Gas Equivalent Conservation MCF 16. Purchased gas 11,287 Waste: MCF 17. Transferred from: k-13-/3 _ / 3 — / t� 18. Transferred to: (Express as a negative #) Commissioner Date 19. Remarks: 1 hereby certify that the foregoing is true and correct to the best of my knowledge. //y/�� Note: All volumes must be corrected to Signature %. J(//( Tile Vice President pressure of 14.65 psia and to a / temperature of 60o F. Authority 20 - AAC25.235. Printed Name Wiliam J. Martinez III Phone 720-328-7182 Date 5/15113 Form 10-422 April 2013 production allocatlon.xlsx AOGCC Facility Report V1 -f -- 61l7 /) 3 Unplanned Events Leas Than or Equal To 1 Hour DATE Start Time End Time End Dale Planned VOLUME mcQDESCRIPTION OF MOMENT AND CAUSE C710N TAKEN TO ELIMINATE CAUSE Planned VOLUME (.Cf) TOTAL I I IN _ r evesvkm are esa an or Not reWlre o nt INotrequiredfor events which are less than orequal to l hour equal to lhour Everts Greater Than 1 Nam DATE Start Mine End Time End Date Planned VOLUME (.Cf) DESCRIPTION OF INCIDENT AND CAUSE ACTION TAKEN TO ELIMINATE CAUSE 0/1/13 2136 13:59 4/1/13 U 4 This Ia normal operation$ far the campressOnto Small, WR..coming from one IG wrprousorspazking Wass venlimothe Wckingcases 0/1/13 11:18 15:58 0/1/13 U d This 6 her ed aperatlam for the comPreswrs W Small, LP flan coming from the IG compressors packing cams verritiolothepackrucates 4/1/13 5:36 7:36 4/1/13 u 6 Thku normaloperamm fee the rommessms to Small, LP flare WMIN from the iG compressors packing cases veMlntolhepackinge.. 6/U13 2:12 490 4/1/13 U aThlz merrs to as maim.?op.rarom, for Ne roesse Small. LP fare emirg from the IG compressors WckMg cases vent into the packing cases 4/2/13 19:24 2359 4/2/13 U ]5 This la normal operation for the commeewrs to Small, LP flare aming from the IG compressors packing cases 1vamt into the pa,ld, .sea 4/2/13 14:30 19:12 4/2113 U 16 This is normal Pperatmnz for the comenhoars to Sma11, LP Rare perning, from the IG rompm—a maingcaase —11. the packing cases 4/2/13 0:00 12AIR 4/2/13 U 37 ThuunenaloperadWz for the compreean,W Small, IP Rare other, from the IG eempevmn tacking came vent into tin packing caws 41/3/13 5:42 17:18 4/3/13 U 31 Thin normal operations lcr the campresson to Small. LP flare coming frem the IG amprossms Packing caws vent Into the packing sans 4/3/13 090 SW 4/3/13 U 15 This is mmaloperation. for the cempremen to Small, LP Rare .mire from the lG compressors Wckmg taws ventlmethe Wca�g caws 4/4/13 13:12 23:59 4/4/13 U39 oeal op othme fort compmsn wto This a nme Small, LP Pon coming from the I rompresears pecking cases vent into the Packing cases 4(4/13 6:18 062 0/4/13 U 6 is b normal .parabens for the comprezwnto Small, LP Mrc coming ft. ! tie IG commremrs peeking cams vent into the parking uses 4/5/13 14:06 16:36 4/S/13 U d This is normal Operations for the commssson to Small, LP Rare ..in from the iG compressors pending -.a ve !ere the Packing eases 4/5/13 12:00 13:00 4/5/13 U 1 his'a normal operations for the compressors to Small, LP Rare coming from In IG ..p.m. packing catts vent into the packing cases 41/5/13 0:00 ]090 4/5/13 V 29 TNS is recent operations lar the compothere m SmaiI, LP Dare coming tram the IG co mpreason packing caws vent into the pectin{ Wass Plant SEW caused by more litl failure and subaeauent psi rekase in 4/6113 16:30 23:59 9/6/13 U 91 MA00. Vestals comuel W vent to flare while plant was ponied fir Redeemed the plant after the mablem area was a wfe restart sated cam and investigated 4/6/13 3:24 11:18 4/6/33 U 18 This is normal operations for the ampresmnto Small, heflam romans from the IS rompmsmus tackins, vent into Vie packing cases 417113 (k90 23:59 4/7/13 I) 6.5 Thisisrormal operotians 777,7c0mpresasrsan Smal4 LP flare coming from the IG cempressan Peckingcatts vent Into the packing cases 410/13 22:62 23:59 418113 U 3 This i6 mmoval operafionz In, the Wmpnumme to m SAIL 1P Rareming frem the IG escommuprz Packing cases vent Into the packing cases 4/8/13 000 21:18 418/13 U We a normal m ecatinns or the compres ersa. Strall, Lie Rare coming team the IG compressors neding cans vim into the Packing cases 4/9/13 0:00 6:00 4/9113 U 13Thisis normal operations; for the compressors to Snell, LP Rare coming from tin lG oompresmrs packing eaves vart into the packing caws 6/10/13 1054 12:00 4/10/13 U 3 This is normal operations for the amPressore 19 mall tir flare coming from the IG compression packing cases want into the pacing cases 1/10/13 7:SB 9:54 4/30/33 U 6 TIS is corned naralianv forahe <emprezmrs he 3malk LP&toeo ming frownnn m the IG mpopacking cami vent Into the making s rase 4/10/13 0:36 5:54 4/30/13 10 Title I. romedoperations for the wmpreawrs to Smalt LP flim coming from the IS compressors PedUng alts ventimathepackincems d/]1/13 11:54 2359 4/11/13 U 32 This h normal opentiom for the compressors es Small, LP Ran comity from the IS compremors parking caws vent into the packing Wass scan 2013 moduNon Apsatienglu. 4o cradngreport 4/11/13 6F2 10:36 4/11/13 U 8 Not required for planned everdcerhitlr are less than crequal Notrequirea T.Ipmnnedevemwhkhareims TOTAL to 1 hour than or equal M 3 hour This is normal operetions the compresmrsW GBANOTOTAL IA07 Smaq LP If... coming from the IG compressors pa&Ingcause, vent into the parMtg cases 4/11/13 054 296 a/33/13 V 1 This is normal operations for the compreswraw mall, LP flan coming form the IS wmpnssers packing cases vent into the packing cases 4/12/13 14:30 20:42 4/33/33 U 11 This is normal operations fort the orr prams to Small, LP flare coming from the lG compressors packing cases somme, the peeMrg<aws 4/12/]3 0:00 12:00 4/12/13 U 34 Is is —,..I operations ort compressors to Small, LP lure coming from the IS ismpnscors packing taus vent into the pal ores 4/13/13 11:39 18:54 1(13)13 U 6 Tho IS norma opeo4ws for the compresmrs w Small, LP Paris coming from W9 lG compressors pakhg cases vent into the packing cases 4/13113 9:10 13:35 4/33/13U ] s s.—Iripentionsforthecompnsmrsto Small, 1p Pahe comilgfromthe IS wmpmemnpaekingcaws vent Into the packing uses 4/19/13 13:06 1a96 4/]11/13 U 9 This a rromrelonionskins Mr the <ompm.m7 Small, V here ramim from the 16 compresmrs pa&fn¢cases vent3nto'he packing uses 0/35/13 14:06 18:18 4/35/13 U ) This is normal operenons forthe compnsmn es Srtwq LP flare coming from the IS compressors parguing uses vent, Ines the packing cases 4/15/13 1234 1354 4/15/13 V 1 Is is nems.] aperetlons ler his, compressorsor Small, LP Pan coms, from the IG—,nosonp ckirs, usesv ent hour the pacases ses 1/D/13 1318 4:36 4(1]/13 U 3 This a compression operations for the compresn to Somali, Wflare coming home the IS wmpramrs paling sews ventI. the leading cases 4/22/13 12:42 16:06 4/22/13 P 13 Saflupping HS compesesn phesmdn, up I&B and deprergrom, IG -A seepofwmpressom 1/24/13 21:12 23:59 4/4/13 V fi isnormal operations for compresmrs to Small, lP Pan comingform the IG wmprettors paeMn,wus o the pe&leg rows 4/24/13 16ID8 19:36 4/24/13 U ) nomal alienations for the compresmrs to Small, LP flan coming from the IG compressors pecking rows o We packing woes 4/4/13 14:18 15:54 4/14/13 U 4 nomal operations ,tecompressorsSmall, Fh LP flare comes, from the lG co p.ssws packing cases M the packing cases 4/24113 11:36 13:48 4/24/13 U 3 wrrreloperationsartewmprcsmnWto the parkiM saws4/24/13 1:30 5:00 4/24(13 U 9 .—I openthm, for We cmpresmrs to Small, LP flare coming from the lG compressors Packingcases to the pee4lne uses 4/25/13 22:18 090 4/25113 U 4 T his is rormtl operations for the wmpresmn to soal{LPflawcoming from the IS campnsmn packing cases vemmm We packing rases 4/25/13 ow 16:54 4/25/13 u 53 This is normal operations for the compressarsw 5.11, LP Rare coming from the IG wmp.,s q&I, cases vent iota the pecking ores 4/26/13 090 6*5 4/26/13 V 17 his is.arms apeirticns for the camprettOrsM SmaII,IPflan comm from the IS compressors "ding area vem into the peeking taus 4/21/13 6:00 2369 4/2)/13 U 5) This ir me I a"rations for the compresmrs M small, LP Oahe coming from We MG ormpmsams pa ding uses or into lM packing cases 4/28113 0:00 11:36 1/28/13 a 38 his is wrmal operations for the compresmnM Small, LP flares ming from the IG wmphessers picking cases vent MM the packing caws 4/39/13 13:54 15:00 4/]9/]3 U 1 his h srormal operations for Me compresmnur Small, LP Pares ming from the lG rompnssys orcin, cares vent into the packle, sus 4/39/13 4:30 6,48 q/29/13 U 5 Thiriswrmalopentiomforthewmpressorsto mall, Lis Pam coming fmm the IS compression packin,orms vent Ines the packing cases TOTAL 827 pliflu ed Events Eess Than or Equal To 3 Hour ANO Not Exceeding 5,000 mcf DATE StartTime End Time End Pate Planned VOLUMEImef) DESCRIPTION OFMCIDENTAND CAUSE CTTONTAKEN TO ELIMINATE CAUSE TOTAL 0 Not required for planned everdcerhitlr are less than crequal Notrequirea T.Ipmnnedevemwhkhareims TOTAL to 1 hour than or equal M 3 hour planned Events EaceedI? l MOpr OR Eueedlrrg 5,000 mcf OATS SdrtTime Entl lime End Date Planned VOLUMEmc DESCRIPTION OF INCIDENfANII CAUSE CITONTAKENTOELIMINATECAUSE TOTAL 0 GBANOTOTAL IA07 Agll 2013 pratluNon allpn9m,tlA AOG X Freing report STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 290000019 B1 Disposition 3. Field Batlami Volume MCF 4. Operator 5. Month/Yearof Disposition SavantAlaska LLC Ma -13 20. For production Irom multiple pools, list mmribution of each pool as a percent of Total Volume. 6. Sola 0 Pool Name Pool Code Percent 7. Reinjected 1,519 Badami 60100 96.93% Batlami, Oil Undefined 60150 3,07% 8. Flared or vented 1 hour or less 118 100.00% 9. Flared or vented more than 1 hour (see instr) 531 10. Pilot and Purge 403 11. Assist Gas 12. Fuel gas used in lease operations. 4,720 13. Other (see instructions) Official Use Only MCF Authorization >1 hr: Safety 14. TOTAL VOLUME (ITEMS 6-13) 7,591 Lease Use MCF 15. NGL Gas Equivalent Conservation MCF 16. Purchased gas 11,587 Waste. MCF 17. Transferred from: — — Commissioner Date 18. Transferred to: (Express as a negative a) 19. Remarks: I hereby certify that the foregoing is trueand correct to the best �of"myy knnowledge. "/ ��/'i9�[�-. /_—_ Note: All volumes must be Corrected to Signature i - Title Vice President pressure of 14.65 psia and to a f temperature of 600 F. Authority 20 Printed Name William J. Martinez IIIAAC25.235. Phone 720-3287182 Date 6/20113 Fnr I!1_d'19 May 2013 production allocation.xlsx AOGCC Facility Report °tjl3 /i 3 Unplanned Events Less Than or Equal To 1 Hour DATE Start Time End Time End Date Planned VOLUME (m DESCRIPTION OF INCIDENT AND CAUSE CTiON TAKEN TO ELIMINATE CAUSE VOLUME (mcf) TOTAL ACTION TAKEN TO ELIMINATE CAUSE 119 Not require or events w Ic are ess t an or Not required for events which are less than or equal to 1 hour equal to 1 hour Events Greater Than 1 Hour DATE StartTime End Time End Date Planned VOLUME (mcf) DESCRIPTION OF INCIDENT AND CAUSE ACTION TAKEN TO ELIMINATE CAUSE 5/1/13 2:00 23:59 5/1/13 U ea This is normal operations for the compressors to Small, LP flare coming from the IG compressors packing cases vent into the packing uses 5/2/13 21:00 23:59 5/2/13 U SO This is normal operations for the compressors to Small, LP flare coming from the IG compressors packing cases vent Into the packing cases 5/2/13 0:00 19:48 5/2/13 U 73 This is normal operations for the compressors to Small, LP flare coming from the IG compressors packing uses vent into the packing cases 5/3/13 14:36 16:06 5/3/13 U 2 This is normal operations for the compressors to Small, LP flare coming from the IG compressors packing cases vent Into the packing uses 5/3/13 13:06 14:30 5/3/13 U 3 This is normal operations for the compressors to Small, LP flare coming from the IG compressors packing cases vent into the packing uses 5/3/13 0:00 12:54 5/3/13 U 46 This is normal operations for the compressors to Small, LP flare coming from the IG compressors packing cases vent into the packing uses 5/10/13 11:0013:18 5/10/13 U Plant shut down during Gas Head detector calibration because It was The turbine was restarted and the plant was 102 not adequately bypassed brought back Into production 5/13/13 19:18 23:59 5/13/13 U 9 This is normal opeutions for the compressors to Small, LP flare coming from the IG compressors packing cases vent into the packing uses 5/14/13 0:00 15:24 5/14/13 U 50 This is normal operations r the compressors to Small, LP flare coming from the IG compressors packing uses vent into the packing cases Flare was a result of a wrong set point on a recycle valve which 5/15/13 16:43 23:59 5/15/13 U 21 regulates the pressure on the gas boot. The recycle pressure was set to 15 PSI, which is the same set point as the flare valve off the gas boot This was realized and corrected at 0259 on 5-16-13 Flare was a result of a wrong set point on a recycle valve which 5/16/13 0:00 3:42 5/16/13 U 21 regulates the pressure on the gas boot. The recycle pressure was set to 15 PSI, which is the same set point as the flare valve off the gas boot Put the set point back to a normal setting of 12 PSI Since the compressor shut down, the turbine was taken off-line to test the black start capabilities of 5/31/13 14:54 17:30 5/31/13 U 109 the new emergency generator. Once the testing IG -B compressor shut down during well testing due to LLP on BI -18 was over the plant was brought back into G/L production TOTAL 531 Planned Events Less Than or Equal To 1 Hour AND Not Exceeding 5,000 mcf DATE Start Time End Time End Date Planned VOLUME (mcf) DESCRIPTION OF INCIDENT AND CAUSE CTION TAKEN TO ELIMINATE CAUSE Not required for planned events which are less than or equal Not required for planned events which are less TOTAL to 1 hour than or equal to 1 hour May 2013 production allocationAu, AOGCC Flaring report Planned Events Exceeding 1 Xour OR Exceeding 5,000 and DATE Start Time I End Time End Date Planned VOLUME (mct) DESCRIPTION OF INCIDENT AND CAUSE CTION TAKEN TO ELIMINATE CAUSE TOTAL I p GRAND TOTAL 549 May 2013 production allocanon.xlsx, AOGCC Flaring report STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSMON 1. Facility Number 7'5 290000019 Name Bi 3. Field Badami 4. Operator I Savant Alaska LLC 5. Monthfyear of Disposition Jun -13 Disposition Volume MCF 20. For pmduction from multiple pools, list contribution of each pool as a percent of Total Volume, 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 33 Badami 60100 98.45% Badami, Oil Undefined 60150 1.55% 8. Flared or vented 1 hour or less 35 100.00% 9. Flared or vented mom than i hour (see instr.) 735 10. Pilot and Purge 390 11. Assist Gas 12. Fuel gas used in lease operations. 21.290 13. Other (see instructions) Official Use Only Authorization >1 hr: Safety 73S MCF 10. TOTAL VOLUME (ITEMS 6.13) 22.483 Lease Use MCF 15. NGL Gas Equivalent Conservation MCF 15. Purchased gas 4,532 Waste: MCF 17. Transferred From: / . 3 _ / CG 78. Transferred to: (Express as a negative #) ommissio er Date 19. Remarks: I hereby certify that the foregoing is true and correct to the beat of my knowledge. Note: All volumes must be Corrected to Sgnaturer%./•J<//ice Tine Vice President pressure of 14.65 psia and to a 6 temperature of 60o F. Authority 20 AAC25.235. Printed Name William J. Martinez 111 Phone 720.32(1 Date 7/19113 rurrn W-422 June 2013 production allocation.xisx AOGCC Facility Report VI -r- 9 /)31)3 Unplanned Events Less Than or Equal To 1 Hour DATE Start Time End Time End Date Planned VOLUME (mcf) DESCRIPTION OF INCIDENT AND CAUSE. CTION TAKEN TO ELIMINATE CAUSE Planned TOTAL 35 Nat required r events Which are ess t an or Not required for events which are less than or equal to 1 hour equal to 1 hour Events Greater Than 1 Hour DATE Start7ime Entl Time End Date Planned VOLUME (mcf) DESCRIPTION OF INCIDENT AND CAUSE ACTION TAKEN TO ELIMINATE CAUSE 770 The Lp flare was used to lower pressure on well B3-35 to assist in 6/2/13 10:12 11:18 6/2/13 Y 24 getting the pressure low enough to close the K valve for state well This Is normal operations to bleed the pressure off safety valve testing- B3-15 during state well safety valve testing 6/6/13 2124 13:59 6/8/13 N 151 The VRU went down for a 2nd time on HH 2nd stage discharge temperature and was left down for repairs In the morning VRU safed out, depressured and readied for repairs 6/9/13 0:00 10:18 6/9/13 N 561 Repaired2nd stage discharge valves an the VRU The VRU went down for repairs on 2nd stage discharge valves restarted and put back on-line TOTAL 735 Planned Events Exceeding 1 Hour OR Exceeding 5,000 mcf DATE Start Time I End TimeEnd Date Planned VOLUME (m DESCRIPTION OF INCIDENT AND CAUSE CTION TAKEN TO ELIMINATE CAUSE TOTAL 0 GRAND TOTAL 770 June 2013 production all"lon.dsr, AOGCC Flaring report STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS nuRpnSITinN 1. Facility Number 2. Facility Name 290000019 Bt Disposition 3. Field Badami Volume MCF 4. Operator 5. Momh/Tear of Dispmftion Savant Alaska LLC Jul -13 20. For production from multiple pools list contribution oreach pool as a percent or Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 27 Badami 60100 97.67% Badami, Oil Undefined 60150 2.33% 8. Flared or vented 1 hour or less 153 100.00% 9. Flared or vented more than 1 hour (see insir.) 62 10. Pilot and Purge 403 11. Assist Gas 12. Fuel gas used in lease operations. 25,102 13. Other (see instructions) Official Use Only Authorization>I hr: Safety 62 MCF 14. TOTAL VOLUME (ITEMS 6.13) 25,746 Lease Use MCF 15. NGL Gas Equivalent Conservation MCF 16. Purchased gas 2.730 Waste: MCF 17. Transferred from: Commissioner (P Date 18. Transferred to. (Express as a negative #) 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. gg Note: All volumes must corrected to psis ia and to a SignalurTitle Vice President pressure of of ((!! temperature of 60o F. Authority 20 Printed Name William J. Martinez III Phone 720-328-7782 Date 8/79/13 AAC25.235. V A A11 Orn1 l l l v-YLL July 2013 production allocatlon.xlsx AOGCC Facility Report VL -P? q/1311.3 Unplanned Events Less Than or Equal To 1 Hour DATE Start Time End Time I End Date I Planned I VOLUME (mcf) DESCRIPTION OF INCIDENT AND CAUSE CTION TAKEN TO ELIMINATE CAUSE TOTAL 153 Not required forevents which are esst anor Not required for events which are less than or equal to 1 hour 1equal to t hour Events Greater Than 1 Hour DATE StartTimel End Time End Date Planned VOLUME (mcf) DESCRIPTION OF INCIDENT AND CAUSE MON TAKEN TO ELIMINATE CAUSL- 7/23/13 712 10:00 7/23/01 P 62 Small LP Flare associated with the VRU being shut down for repairs. Make the repairs and put the VRU back online. TOTAL 62 Planned Events Exceeding 1 Hour OR Exceeding 5,000 mcf DATE Start Time End Time End Date Planned VOLUME (mcf) DESCRIPTION OF IN AND CAUSE ACTION TAKEN TOELIMTNATE CAUSE TOTAL p GRAND TOTAL 1 215 July 2023 production allowtion.xlsx, AOGCC Flaring report STATE OF ALASKA ALASKA OILAND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 290000019 2. Facility Name B1 3. Field Badami 4. Operator Savant Alaska LLC S. MonthNear of ug -13 position Aug -13 Disposition Volume MCF 20. For production tom multiple pools, fist contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 718 Badami 60100 95.86% Badami, Oil Undefined 60150 4.14% 8. Flared or vented 1 hour or less 60 100.00% 9. Flared or vented more than 1 hour (see instr.) 815 10. Pilot and Purge 403 11, Assist Gas 12. Fuel gas used in lease operations. 13,162 13. Other (see instructions) Oficial Use Only Authorization 11 hr. Safety �� MCF 14. TOTAL VOLUME (ITEMS 6-13) 15,158 Lease Use MCF 15. NGL Gas Equivalent Conservation MCF 16. Purchased gas 6,595 Neste: MCF 17. Transferred from: 7 -/D -i 18. Transferred to: (Express as a negative p) Commissioner Data 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. �� �J �--i—� Note: Alt volumes must corrected to Signature 1 l�� Title vice President pressure of 14.65 sisia and to a temperature of 60o F. Authority 20 Printed Name William J. Martinez III Phone 720-328-7182 Date 8/20/13 AAC25.235. d1L1111PQa44 August 2013 production allocation.zlsz AOGCC Facility Report VL F 131 J4 - I Hour TOTAL 60 lNot required for events which are less than or equal to 1 hour 1equai to 1 hour are Events Greater Than 1 Hour DATE I Start Time I End Time I End Date I Planned VOLUME (mcf) DESCRIPTION OF INCIDENT AND CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 DATE Start Time End Time End Date Planned/ Unplanned VOLUME (mcf) DESCRIPTION OF INCIDENT AND CAUSE ACTION TAKEN TO ELIMINATE CAUSE 8/11/13 9:54 23:59 8/11/13 P 66 Plant BESD and tum around work The plant will be re -started afterturn around. 8/11/13 6:48 8:18 8/11/13 P 98 Plant BESD and turn around work. The plant will be re -started after turn around. 8/12/13 19:36 23:24 8/12/13 U 71 We had problems keeping our vapor recovery compressor running. Worked on getting the compressor running. 8/12/13 0:00 16:42 8/12/13 P 164 The plant was shut down for turn around. We completed the work and re -started the plant. 8/26/13 4:24 19:30 8/26/13 P 387 LP flare when the VRU was down for repairs- Repair cooler leaks and re -start VRU. 8/31/13 5:30 17:54 8/TA U 29 Small, LP flare volume coming from the IG compressors packing case This is normal operations for the compressors to vents. vent gas into the packing case. TOTAL 815 Planned Events Exceeding 1 Hour OR Exceeding 5,000 mcf DATE I Start Time I End Time I End Date I Planned VOLUME (mcf) DESCRIPTION OF INCIDENT AND CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 GRAND TOTAL 875 August 2013 production allocxtion.xlsx, AOGCC Flaring report STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 290000019 2. Facility Name 131 3. Field Badami 4. Operator I Savant Alaska LLC 5. Monthfyear of Disposition Sep -13 Disposition Volume MCF 20. For production 6om multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 3 Bedami 60100 97.93% Badami, Oil Undefined 60150 2.07% 8. Flared or vented lhour or less 147 100.00 9. Flared or vented more than 1 hour (see instr.) 765 10. Pilot and Purge 390 11. Assist Gas 12. Fuel gas used in lease operations. 41,639 13. Other (see instructions) Official Use Only Authorization >7 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6.13) 42.945 Lease Use MCF 15. NGL Gas Equivalent Conservation MCF 16. Purchased gas 567 MCF 17. Transferred from: l —7-16 -14 �/,•� 18. Transferred to: (Express as a negative #) Commissioner Date 19. Remarks: 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected to Signature �' j�/�Gl Title Vice President pressure of 14.65 Asia and to a c- temperature of 60o F. Authority 20 AAC25.235. Printed Name William J. Martinez III Phone 720-328-7182 Date 10/17/2013 Form 10-422 September 2013 production allocation AOGCC Facility Report VL, F 6/3/ l4 Events Less Than or Equal To 1 Date TOTAL 147 (Not required for events which are less than or equal to 1 hour 1equal to 1 hour or Events Greater Than i Hour DATE Start Time End Time End Date Planned VOLUME (mcf) DESCRIPTION OF INCIDENT AND CAUSE CTI TAKEN TO ELIMINATE CAUSE TOTAL Planned/ Not required for planned events which are less than ar equal to 1 hour DATE Start Time End Time End Date Unplanned VOLUME (mcf) DESCRIPTION OF INCIDENT AND CAUSE ALCTION TAKEN TO ELIMINATE CAUSE 9/10/2013 21:18 23:59 9/10/2013 U 8 Fourth stage suction scrubber auto valve leaking on IG -13. Closed the manual valve. 9/10/2013 10:00 12:12 9/10/2013 U 6 Fourth stage suction scrubber auto valve leaking on IG -B. Closed the manual valve. 9/11/2013 22:42 23:59 9/11/2013 U Wall, are voume coming from a compressors pac mgcase is is norma opera to or ecompressors To 2 vents gas Into the packing case. 9/11/2013 17:12 19:30 9/11/2013 U 5 ma, are voume coming from a compressors pac mgcase is is norma operation or o ecompressors ven vents gas into the packing case. 9/11/2013 14:42 17:06 9/11/2013 U 6 ma , are volume coming ram a compressors packing case Is is norma operation or a compressors oven vents. gas Into the packing case. 9{11/2013 0:00 14:12 9/11/2013 U 46 Small, are volume coming from a compressors packing case Is is norma operation or a compressors oven vents. gas into the packing case. 9/14/2013 8:00 20:48 9/14/2013 P 426 We shut the VRU down for maintenance work. This is normal when we shut the Vi down. 9/15/2013 8:12 23:59 9/15/2013 U 51 small, LF flare volume coming tram the lu compressors pac mg case I In Is is norma m opera n for a ressors o compven vents. gas into the packing case. 9/16/2013 0:00 23:59 9/16/2013 U 77 ma , are volume coming from a compressors pac mg case Is Is norma operation or a compressors oven vents. gas into the packing case. 9/17/2013 0:00 23:59 9/17/2013 U 75 �mall, Up flare volume coming from the compressors packing case I his Is normal operation for the compressors o ven Venn gas into the packing case. 9/18/2013 15:24 18:12 9/18/2013 U Small, are volume coming from a compressors Packing case Is Is norma operation or a compressors o ven 7 vents. gas into the packing case. 9/18/2013 0:00 9:18 9/18/2013 U 27 �mall, LP flare volume coming from the a compressors packing case I his is normal operation for the compressors to vent vents gas into the packing case. 9/25/2013 2:42 6:24 9/25/2013 U 8 a , are volume coming from a compressors packing case mvents. is Is norma operation or a compressors o vent gas into the packing case. 9/25/2013 0:00 1:30 9/25/2013 U 2 Small, LP flare volume coming from the lb compressors pac Ing case i his Is normal operation for a compressors oven vents. gas into the packing case. 9/30/2013 18:18 23:59 9/30/2013 U 19 Small, LP here volume coming from thelb compressors packing case I ms Is normal operation Yor me compressors oven vents. gas into the packing case. TOTAL 765 Planned Events Less Than or Equal To 1 Hour AND Not Exceeding 5,000 mcf DATE Start Time End Time End Date Planned VOLUME (mcf) DESCRIPTION OF INCIDENT AND CAUSE CTI TAKEN TO ELIMINATE CAUSE TOTAL Not required for planned events which are less than or equal to 1 hour Not required for planned events which are less than ar equal to 1 hour Planned Events Exceeding 1 Hour OR Exceeding 5,000 mcf DATE StartTime End Time End Date Planned VOLUME (mcf) DESCRIPTION OF INCIDENT AND CAUSE CTION TAKEN TO ELIMINATE CAUSE TOTAL 0 GRAND TOTAL 912 September 2013 production allocation, AOGCC Flaring report STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRnnl irr:n rrec nieonerr,nki 1. ---- Facility Number 2. Facility Name 3. -- --- _.. vr-w . Iwl VVI 1 IVt\ Field 290000019 Bi 4. Operator 5. Month/Year of Disposition Disposition Badami Savant Alaska LLC Oct -13 Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total 6. Sold Volume. 0 Pool Name Pool Gode Percent 7. Reinjected 102 Badami 60109 9834% Badami, Oil Undefined 60150 1.66% B. Flared or vented 1 hour or less Y48 100.00% 9. Flared or vented more than 1 hour (see instr.) 1,505 10. Pilot and Purge 403 11. Assist Gas 12. Fuel gas used In lease operations. 35.077 13. Other (see instructions) official Use Only 14, TOTAL Authorization>1 hr. ,SO MCF Safety VOLUME (ITEMS & 13) 37,335 15. NGL Gas Equivalent Lease Use MCF 16. Purchased gas Conservation MCF 2,990 Waste: MCF 17. Transferred from: 18, Transferred to: (Express as a negative #) Commissioner Date 19. Remarks: I hereby certify that the foregoing Is true and correct to the best knowledge. of my Note: All volumes must be corrected to Signature `L Title Vice President pressure of 94.65 psia and to a temperature of 60o F. Authority 20 Printed Name Wllllam J. Martinez IIIAAC25.235. Phona 720.328-7162 Date 11I20Y2013 Form 10-499 October 2013 production allocation AOGCC Facility Report V1� To 1 DATE I Start Time I End Time I End Date I Unplanned I VOLUME (mcf) I DESCRIPTION OF INCIDENT AND CAUSE I ACTION TAKEN TO ELIMINATE CAUSF vc iegmreo Tor events which are TOTgI 248 Not required for events which are less than or equal to 1 hour equal to 1 hour Events Greater Than 2 Hour Planned/ DATE Start Time End Time End Date Unplanned VOLUME(mcF) DESCRIPTION OF INCIDENT AND CAUSE ACTION TAKEN TO ELIMINATE CAUSE 10/1/2013 11:18 22:30 10/1/2013 U 26 ma are vo ume coming from ne compressors pac ing case s is normal operation for e compressor o "=n vent. gas into the packing use. 10/1/2013 9:30 10:42 10/1/2033 U 1 ma are volume coming from a compressors pac ng case is u norma opera nor a compressor o vent vent' gas Into the packing use. 10/1/2013 0:00 8:00 10/1/2013 U 23 he gas compressor s u own ue o a pressure on ewe ea For well B145. Everything was reset and brought back online. 10/2/2013 12:36 23:59 10/2/2013 Ub 34 mail LP flare vol ume coning I rom Tre compressrns pac nguse I his isnorma operation mr memmpressor toven 10(2/2013 3:42 11:42 10/2/2013 U vent. gas Into the packing case. 197 The Turbine A shut down due to a HH vibration. Restarted plant on Turbine B. 10/2/2013 2:30 3:36 10/2/2013 U 0 ma are volumecoming rom a chmpressorS pac ing case is is norma ope t or ecompressor oven vent. gas into the packing case. 10/3/2013 15:18 17:06 10/3/2013 U 5 ma are volume wining romthe l compressorspac Inguse is is norma operation rt a compressor to vent vent' gas Into the packing case. 10/3/2013 13:06 15:12 10/3/2013 U 5 Small L are volume coming rite compressors packing case Tis is norma operMion r the compressorto vent 10/3/2013 0:00 11:06 10/3/2013 U 37 vent. gas into the packing case. vent gas into the packing case. 10/6/2013 21:48 23:59 10/6/2013 U 6 ma are voume coming romthe compressors packing use Tis is norma operation rt ecompressortovent vent. gas Into the packing case. 10/7/2013 2:30 6:30 10/7/2013 U 10 ma P are vo ume coming rami the compressors packing case Isu norma operation ort the compressor to vent vent. gas into the packing use. 10/10/2013 4:54 6:54 10/10/2013 U 3 ma L flare voumewming romt a M compressors Packing czise I his is normal operation Tort emmpressor to vent 10/10/2013 0:18 1:30 10/10/2013 U vent. gas Into the packing case. 1 vent. gas Into the packing rase. 10/13/2013 14:12 17:Op 10/13/2013 P 66 is rs norma practice to depressure pipeillne or Depressure utility Pipeline for maintenanm. maintenance. 10/15/2013 15:00 17:06 10/15/2013 U 3 ma are volume coming fro me IQ compressors pac Ing case is is normal operation fort the compressor to vent vent. gas Into the packing use. 10/18/2013 15:36 17:12 10/18/2013 U 1 ma are volume mining fromthe IG compressorspac Ingcase This is normal operation fort ecompressor to vent vent. gas Into the packing case. 10/19/2013 19:12 23:18 10/19/2013 U11 'Small LP flare volume coming int aIG compressors packing case This is normal operation fort n compressor ovevent. gas Into the packing case. 10/20/2013 21:06 23:59 10/20)2013 U 5 ma I LP liare vol ume coming rom t e compressors pa< ing case This is normal operation ort a compressorto vent vent' gas into the packing use. 10/21/2013 0:00 23:59 10/21/2013 U 91 Brings ewe ins werand7e careful to not over Flared off of the second stage separator bringing in 81-14. pressure the second stage separator. 10/22/2013 0:00 23:59 10/22/2013 U 92 Bring the well ins ower and ge uleful to not over Flared off of thecond stage separator bringing In 81-14, so pressure the second stage separator. 10/23/2013 0:00 23:59 10/23/2013 U 92 911111111 LP flare ve ume comng from the, I G compressors pac ng case is is norma operation ort a compressor to vent Ivent. gas into the packing case. October 2013 production allocation, AOGCC Flaring report 10/24/2013 0:00 23:59 10/24/2013 U 91 Small LP flare volume coming from the I G compressors packing case This is norma operation fort the compressor to vent vent. gas into the packing case. 10/25/2013 0:00 23:59 10/25/2013 U 97 Small LP flare volume coming romthe Icompressors pac ing case This is normal operation fort the compressor to vent vent. gas Into the packing case. 10/26/2013 0:00 23:59 10/26/2013 U 95 Small LP flare volume coming from the IS compressors packing case Tis is normal operation for the compressor to vent vent. gas into the packing case. 10/27/2013 0:00 23:59 10/27/2013 U 94 SmallP are volume coming from the compressors pac ing case is is norma operation ort a compressor to vent vent. gas into the packing case. 10/28/2013 0:00 23:59 10/28/2013 U 93 �mall LP flare volume coming from the IG compressors packing case This is normal operation fort the compressor to vent vent. gas into the packing case. 10/29/2013 0:00 23:59 10/29/2013 U 89 Small P flare volume coming from the IG compressors packing case This is norma operation or Me—compressor to vent vent gas Into [he packing case. 10/30/2013 0:00 23:59 10/30/2013 U 92 ma are vo ume coming rom t e I compressors packing ng case is is norma operation ort a compressor to vent vent. gas into the packing case. 10/31/2013 20:12 0:00 10/31/2013 U 11 Small LP flare volume coming fromthe IG compressors pac mg case This is normal operation fort the compressor to vent vent. gas Into the packing case. 10/31/2013 0:00 17:06 10/31/2013 U 129 Lost IG -B compressor on a HH first stage discharge pressure because gas froze in the coolers due to a quick drop In temperature. JCIosed louvers to keep gas from freezing. TOTAL 1,505 GRAND TOTAL 1,753 October 2013 production allocation, AOGCC Flaring report STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PROnimm rnS n1cPnc1T1n1U 1. Facility Number 2. Facility Name 290000079 B1 Disposition -- --------- 3. Field Badami Volume MCF ----- . VV...V.. 4. Operator 5. MonthlYear of Disposition Savant Alaska LLC Nov -13 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 Badami 60700 98.97% Badami, Oil Undefined 60150 1.03% 8. Flared or vented 1 hour or less 23 100.00% 9. Flared or vented more than 1 hour (see instr.) 1,643 10. Pilot and Purge 390 11. Assist Gas 12. Fuel gas used in lease operations. 44,761 13. Other (see instructions) Official Use Only Authorization >1 hr- Safety �� MCF 14. 74. TOTAL VOLUME (ITEMS 6-13) 46,817 Lease Use MCF 15. NGL Gas Equivalent Conservation MCF 16. Purchased gas 530 waste: MCF 17. Transferred from: Commissioner Date 18. Transferred Transferred to: (Express as a negative #) 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. %��` Note: All volumes must corrected to Signature _�/ ✓�,� Title Vice President pressure of 14.65 psisla and to a temperature of 60o F. Authority 20 Printed Name William J. Martinez III Phone 720-328-7782 Date 12116/2013 AAC25.235. Rn.m 10 A00 November 2013 production allocation AOGCC Facility Report VLF �-4114,- Events Less Than or Equal To 1 Hour anne LU E DATE Start Time End Time End Date Unplanned (mcf) CRIPTION OF INCIDENT AND CA ACTION TAKEN TO ELIMINATE CAUSE 11/1(13 Not require or le—ve—n—ts-w—T is are less Not required for events which are less t an or TOTAL 23 than or equal to 1 hour equal to I hour Events Greater Than 1 Hour Planned/ VOLUME DATE StartTime End Time End Date Unplanned (mcf) CRIPTION OF INCIDENT AND CA ACTION TAKEN TO ELIMINATE CAUSE 11/1(13 19:12 23:59 11/1/13 U 22 v v compressors packing case vents. gas into the packing cases. 11/1/13 14:42 16:00 11/1/13 U 3 Small LF Tiarev u op e vent compressors packing case vents. gas into the packing cases, 11/1/13 12:18 14:06 11/1/13 U 5 ma are volume c0m1ng rom e i is norma operation or e compressors vent compressors packing case vents. gas into the packing cases. i1J1/13 0:00 11:54 11/1/13 U 39 v umL coming I n ormal v n compressors packing case vents. gas into the packing cases. 11/2/13 3:00 23:59 11/2/13 U 140 volumeTore compressors to vent compressors packing case vents. gas into the packing cases. Had a PLC Issue in M-400, which caused the In the future, when we make our rounds, we will be plant to BESD. The PLC somehow got turned sure to check the switches on all the PLC stations each 11/2/13 0:00 2:S4 11/2/13 U 107 off and we were running on hack -up time we go into the Mods. batteries when they ran out of charge, it then showed a fire alarm and BESD the plant. 11/3/13 0:00 23:59 11/3/13 U 124 volumeSmall LF flare o s v -97- compressors packing case vents. gas into the packing cases. 11/4/13 0:00 23:59 11/4/13 U 110 volumeSMNII IF flare compressors packingcase vents. gas into the packing cases. 11/5/13 0:00 23:59 11/5/13 U 103 ma are volume coming from e is is norma operation or e compressors o ven compressors packing case vents. gas into the packing case. 11/6/13 11:18 23:59 11/6/13 U 53 volume-coiningSmall, LF Tare compressors packing case vents. gas into the packing cases. 11/6/13 0:00 11:12 11/6/13 U 52 volume compressors1:37477r compressors packing case vents. gas into the packing cases, 11/7/13 0:00 23:59 11/7/13 U 49 v TO[tneconnpressor�v compressors packing case vents. gas into the packing cases. 11/8/13 2:50 9:54 11/8/13 U 12 compressors packing case vents. gas into the packing cases. November 2013 production allocation.xlsx, AOGCC Flaring report 11/8/13 0:00 2:42 11/8/13 U 4 volurnevent compressors packing case vents, gas into the packing cases. 11/9/13 6:06 23:59 11/9/13 U 35 volume=719=77= I asnormal compressors packing case vents. gas into the packing cases. 11/10/13 0:00 23:59 11/10/13 U 42 ma , are vo ume come g rom e is is norma operation or e compressors o v en compressors packing case vents. gas into the packing cases. 11/11/13 3:30 15:12 11/11/13 U 18 v uoperationo v compressors packing case vents. gas into the packing cases. 11/11/13 0:00 3:24 11/11/13 U 4 snIall, LF flare volume compressorsvent compressors packing case vents. gas into the packing cases. 11/12/13 22:30 23:59 11/12/13 U 2 �Mall, Ll' Tare volume =717773M== I tits is normal operation Tor compressors packing case vents. gas into the packing cases. 11/13/13 0:00 23:59 11/13/13 U 47 �roall, LF flare volume i v compressors packing case vents. gas into the packing cases. 11/14/13 0:00 23:59 11/14/13 U 45 Small, are volume cQnTI797F3—M—fre= I Mis is normal operation Tor me compressors o venr- compressors packing case vents. gas into the packing cases. 11/15/13 0:00 23:59 11/15/13 U 41 v u vent compressors packing case vents. gas into the packing cases. 11/16/13 0:00 23:59 11/16/13 U 40 volume i y compressors packing case vents. gas into the packing cases. 11/17/13 17:18 23:59 11/17/13 U 10 volume vent compressors packing case vents. into the packing cases. 11/17/13 0:00 17:12 11/17/13 U 30 7MTrr77M79—vM=mmg from Me IG Inis is normal operation Tor z7773TRrM97`7r37rrIT- compressors packing case vents. into the packing cases. 11/18/13 18:48 22:18 11/18/13 U 6 volume u...is is normal operation Tor Me compressors to ve compressors packing case vents. gas into the packing cases. 11/18/13 0:00 1:18 11/18/13 U 2 volume vent compressors packing case vents. gas into the packing cases. 11/19/13 0:00 23:59 11/19/13 U 77 volume e compressors 73 v compressors packing case vents. gas into the packing cases. 11/20/13 0:00 23:00 11/20/13 U 44 ma , e vo ume coming from tne G I nis is normal operation Tor Me compressor vent compressors packing case vents. gas into the packing cases. 11/21/13 13:24 23:59 11/21/13 U 20 5mall, LF rare u compressorsv compressors packing case vents. gas into the packing cases. 11/21/13 9:24 11:48 11/21/13 U 4 VOIURrse conningis normal operationvent compressors packing case vents. gas into the packing cases. 11/21/13 6:24 7:36 11/21/13 U 2 bri LV flare volume vem- compressors packing case vents. gas into the packing cases. 11/21/13 2:06 3:30 11/21/13 U 2 �rfldll,LFTiarevoiumecun)ingtron)tfleib MIS 15 normal operation lor Me compressors v n compressors packing case vents. gas into the packing cases. 11/22/13 0:00 23:59 11/22/13 U 50 volulne coming from tne l= I asi compressors packing case vents. gas into the packing cases. November 2013 production allocation.xlsx, AOGCC Flaring report 11/23/13 0:30 23:59 11/23/13 U 40 LFTIarevc1uM=iWRTrom one M i nsvent compressors packing case vents. gas into the packing cases. 11/24/13 0:00 13:12 11/24/13 U 22 Z,Mall, LF flare volume coming from tne To I nis is normal operation For Me compressors to y compressors packing case vents. gas into the packing cases. 11/25/13 12:54 23:59 11/25/13 U Small, LV Tlare volume coming TrOM the lb I I nis is normal operation Tor Ine compressors o ven 16 compressors packing case vents. gas into the packing cases. 11/26/13 9:30 21:30 11/26/13 U 19 Small, LH flare volume veMT- compressors packing case vents. gas into the packing cases. 11/26/13 7:54 9:24 11/26/13 U 1 �Frall, LJ` flare volume coming room Me IG inis is normal operation Tor trie compressors to vent compressors packing case vents, gas into the packing cases. 11/26/13 6:30 7:48 11/26/13 U 1 Milan,, LF Trarc volume n lot Erie compressors to venT- compressors packing case vents, gas into the packing cases. 11(26/13 0:00 6:24 11/26/13 U 9 �Mall, LP flare volume cz;ming Trom tne lb I Mrs is normal operation Tor Me compressors to vent compressors packing case vents. gas into the packing cases. 11/27/13 21:30 23:59 11/27/13 U 3 �Mall, LF flare vo ume coming trom the G I his Is normal operation Tor Me comprMs7r7to ven compressors packing case vents. gas into the packing cases. 11/27/13 17:48 21:24 11/27/13 U 4 Small, LF flare volume vent - compressors packing case vents. gas into the packing cases. 11/27/13 7:18 9:24 11/27/13 p 36 VHU down tor lubeoil Iterc ange. Pertorm PM and put back ovine. 11/28/13 0:00 23:59 11/28/13 U 50 volume venT- compressors packing case vents. gas into the packing cases. 11/29/13 0:00 23:59 11/29/13 U 50 ma are vo ume coming trom the lb I his Is normal operation tar Me compressors to ven compressors packing case vents. gas into the packing cases. 11/30/13 0:00 23:59 11/30/13 U 45 volume I is normal operation Tor Me compressors Tv compressors packing case vents. gas into the packing cases. TOTAL 1'04� November 2013 production allocation.xlsx, AOGCC Flaring report STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED Gas nispns1T1nN 1. Facility Number 290000019 2. Facility Name B1 3. Field Badami 4. Operator I Savant Alaska LLC 5. Month/Year of Disposition Dec -13 Disposition Volume MCF 20. For production from multiple pools, Ilst contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 Badami 60100 97.55% Badami, Oil Undefined 80150 2.45% 8. Flared or vented 1 hour or less 90 100.00% 9. Flared or vented more than 1 hour (see instr.) 2,118 10. Pilot and Purge 403 11. Assist Gas 12. Fuel gas used in lease operations. 52,836 13. Other (see instmc8ons) Official Use Only Authorization >1 hr. Safety 1 /l l� MCF 14. TOTAL VOLUME (ITEMS 6-13) 55,447 Lease Use MCF 15. NGL Gas Equivalent Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: / 7 18. Transferred to: (Express as a negative #) Commissioner Date 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. �� ,J % Title Vice President Note: All volumes must be corrected to Signature r s pressure of 14.65 psia and to a `— temperature of 600 F. Authority 20 Printed Name William J. Martinez III Phone 720-328-7182 Dale 1/1612014 AAC25.235. V-- in non December 2013 production allocation AOGOZ Facility Report vLP 6/3/15L Events Less Than or Equal To 1 Hour Planned/ DATE StartTime End Tlme End Date Unplanned VOLUME (mcf) DESCRIPTION OF INCIDENT AND CAUSE CTION TAKEN TO ELIMINATE CAUSE 12/1(2013 0:00 Not required for events which are less than or TOTAL 90 Not required for events which are less than or equal to 1 hour equal to 1 hour Events Greater Than 1 Hour Planned/ DATE StartTime End Time End Dat= Unplanned VOLUME (mcf) DESCRIPTION OF INCIDENT AND CAUSE ACTION TAKEN TO ELIMINATE CAUSE 12/1(2013 0:00 23:59 12/1/2013 U 62 rs s norma operations r me compressors o Small, LP flare coming from the IG compressors packing case vents. vent gas Into the packing cases. 122/2013 0:00 23:59 12/22013 U 80 rs is norma operations or ecompressorso Small, LP flare coming from the lG compressors packing case vents. vent gas into the packing cases. 12/2/2013 10:30 12:12 12/2/2013 U 1 Sman he nare causea from , ci,11118 111,51 of the bringpan ac upon Qi I -b an ou emo0 facility issues with GT -A. /2/2013 30:30 12:12 12/2/2013 U 50 Small are Taus from -- , causing a o e nngpan ac upon- an oues o0 r facility issues with GT -A. 12/3/2013 10:36 23:59 12/3/2013 U 23 rs u norma o operations or Me Small, LP flare comingfrom me IG compressors packing Gaze vents. p p g vent gas into the packing roses. 12/3/2013 0:00 2:34 12/3/2013 U 4 This is normal operations for the compressors to Small, LP flare coming from the IG compressors packing case vents, vent as into [he ackin cases. 12/4/2013 0:00 23:59 12/4/2013 U 48 Is snorma operabpns rt ecompressors to Small, LP flare coming from the lG compressors packing case vents. vent gas into the packing cases. 12/5/2013 0:00 23:59 12/5/2013 U 42 is is norma operations ort ecompressors to Small, LP flare comi ng from the IG compressors packing case vents. vent gas into the packing cases. 12/6/2013 0:00 23:59 12/6/2013 U 48 Small, LP flare comi ng from the lG compressors packing case vents. vent gas into the packing cases. 12/7/2013 19:48 23:59 12/7/2013 Ug is is norma operations or the compressors to Small, LP flare coming from the IG compressors packing case vents. vent: a5imo the packing cases. 12/7/2013 0:00 19:12 12/7/2013 U T norma operations orthe compressors to Small, LP flare coming from the IG compressors packing ase vents. vent gas into the packing ca ses. 12/8/2013 0:00 23:59 12/8/2013 U 45 This is norma operations orthe compressors to Small, LP flare coming from the IG compressors packing case vents. vent gas into the packing cases. 12/9/2013 21:42 22:48 12/9/2013 U 0 Small, LP flare coming from the lG compressors packing case vents. vent gas into the packing cases. 12/9(2013 18:00 20:54 12/9/2013 U 3 This is norma operations ort the compressors to Small, LP flare coming from the IG compressors packing case vents. vent gas into the packing cases. 12/9(2013 16:18 1]:54 12/9/2013 U 1 This is norma operations orthe compressors to Small, LP flare coming from the IG compressors packing case vents. vent gas into the packi ng cases. 12/9/2013 0:00 ]:54 12/9/2013 U 4 Is is norma operations orthe compressors to Small, LP flare coming from the IG compressors packing case vents. vent gas into the packing cases. 12/10/2013 18:54 22:Ofi 12/10/2013 U 3 This Is normal operations ort the"pressors to Small, LP flare corrin from the IG compressors packing case vents. Corning P p g vent gas into the packing aces. 12/11/20]3 16:18 23:59 12/11/2013 U 30 This is norma operations r t compressors to e Small, LP flare coming from the IG compressors packing case vents. vent gas into the packing a an. 12/11/2013 3AB 14:30 12/11/2013 U SS This is norma operations rt the compressors to Small, LP flare coming from the IG compressors packing case vents. vent gas into the packing cases. 12/12/2013 0:00 23:59 12/12/2013 U 89 is is normal operations -;;r tecompressors to Small, LP flare coming from the lG compressors packing ase veni vent gas into the packing cases. 12/13/2013 0:00 23:59 12/13/2013 V106 Tis is norma operations the compressors to Small, LP flare coming from the IG compressors packing case vents. vent gas into the packing cases. 12142013 0:00 23:59 12/14/2013 U 101 is is normal operations orthe com pressors to Small, LP flare coming from the IG compressors packing ase vents, vent gas into the packing cases. 12/15/2013 OAO 23:59 12/15/2013 U 115 T 1s is normal operations ort ecompre55ar5 t0 Small, LPflare coming from the IG compressors packing case vents. vent gas into the packing cases. December 2013 Omdoe ion allootion, ADGCC Flaring report 12/16/2013 0:00 23:59 12/16/2013 U 112 This is normal operations for thecompressors to Small, LP flare coming from the IG compressors packing case vents. vent gas into the p acking cases. 12/17/2013 0:00 23:59 12/17/2013 U 97 is is normal operations Tortire compressors to Small, LP flare Coming from the lG compressors packing case vents. vent gas into the packing cases. 12/18/2013 0:00 23:59 12/18/2013U 55 This is normal operations forthe compressorsto Small, LP flare coming from the IG compressors packing case vents. vent gas into the packing cases. 12/19/2013 0:00 23:59 12/19/2013 U 63 rs is norma operations for the Compressors to Small, LP flare mining from the IG Compressors packing case vents. vent gas into the packing cases. 12/20/2013 21:06 23:59 12/20/2013 U 4 This is norma operahons orthe compressors to Small, LP flare coming from the IG compressors packing case vents. vent gas into the packing rases. 12/20/2013 6:36 18:00 12/20/2013 U 37 This is normal operations ort ecompressors to Small, LP flare coming from the IG compressors packing case vents. vent gas into the packing cases. 12/2080]3 0:00 2:12 12/20/2013 U 2 Tis is norma operations orthe Compressors to Small, LP flare coming Rom the IG compressors packing case vents. vent gas into the packing cases. 12/21/2013 0:00 23:59 12/21/2013 U 41 is n is orma operahons or ecompressors to Small, LP flare coming from the lG compressors packing use vents. vent gas lino the packing cases. 12/22/2013 19:30 0:00 12/228013 U g rsisnorma operations ort ecompressors to Small, LP flare Coming from the IG compressors packing use vents. vent gas into the packing cases. 12/22/2013 17:12 18:12 12/22/2013 U 12 Tried starting our IG -e gas compressor, but it was leaking badly past the packings. Ended up having to de -pressure it by venting to flare. Maintenance is working to fix this problem. 12/22/2013 0:00 17:12 12/22/2013 U 36 is is normal operations torthe compressors to Small, LP flare coming from the IG compressors packing case vents, vent gas into the packing cases. 12/23/2013 8:24 23:59 12/23/2013 U 49 This is norma operations ort ecompressors to Small, LP flare coming from the IG compressors packing case vents. vent gas into the packing cases. 12/23/2013 0:00 7:42 12838013 U 16 This is norma operations for t eCompressors to Small, LP flare coming from the IG compressors packing case vents. vent gas into the packing uses. 12/24/2013 D:00 23:59 12/24/2013 U 126 is isnorma operations for thecon, presson to Small, LP Flare coming from the IG compressors packing use vents. vent gas Into the packing uses. 12858033 0:00 23:59 1285/2013 U 115 This is norma operations orthe Compressors to Small, LP flare coming from the IG compressors packing case vents. vent gas into the packing uses. 12/26/2013 0:00 23:59 12/26/2013 U 152 This is norma operations rthe compressors to Small, LP flare coming from the IG compressors packing case vents. vent gas into the packing uses. 12/27/2013 0:00 23:59 12/27/2013 U 75 This is normal operations for the compressors to Small, LP flare Coming from the IG compressors packing case vents. vent gas into the packing uses. 12/28/2013 9:54 11:00 12/28/2013 U 3 his is normal operations fort ecompressors to Small, LP flare Coming from the IG Compressors packing case vents. vent gas into the packing cases, 12/28/2013 0:00 9:48 12/28/2013 U 30 This is normal operations forthe compressors to Small, LP flare coming from the IG compressors packing case vents. vent gas into th a packing cases. 12/29/2013 1824 23:59 12/29/2(113 U 15 rs is norma operations rthe Compressors to Small, LP flare coming from the IG Compressors packing use vents. vent gas i nto the packing uses. 12/30/2013 14:54 23:59 1280/2013 U 29 is is normai operations for thecompressors to Small, LP flare mining from the IG compressors packing use vents. vent gas into the packing uses. 1280/2013 8:36 13:54 ]2/30/2013 U 21 This is norma operations orthe Compressors to Small, Els flare coming from the IG compressors packing case vents. vent gas into the packing cases, 12/30/2013 0:00 6:42 12/30/2013 U 11 This is norma operations orthe compressors to Small, LP fla re coming from the IG compressors packing use vents. vent gas into the packing cases. 12/31/2013 0:00 23.59 12/31/2013 U g4 Thi519 norma operahons orthe compressors to Small, LP flare Coming from the IG Compressors packing use vents. vent gas into the packing cases. TOTAL 2,118 GOANDTOTAL 2,209 December 2013 production allocation. AOGCC Flaring report