Ferguson, Victoria L (DOA)
From: Zane Henning < Zane. Henning @savantalaska.com>
Sent: Monday, July 07, 2014 7:09 AM
To: Ferguson, Victoria L (DOA)
Subject: RE: Badami flaring events over an hour
Follow Up Flag: Follow up
Flag Status: Flagged
Victoria,
Further our conversation and your follow up email:
1. Our annual PM's on each Injection Gas (IG) compressor generally occur in the summer of each year. We do
have the option to perform heavy maintenance on either IG compressor anytime in the year since we have two
machines. Lube oil usage and discharge temperatures currently drive maintenance inspections.
2. In the past we have monitored oil usage on distance pieces as criteria on when perform maintenance on
packings.
3. Several items can effect gas bypass on packings including operating pressure, injection pressure, operating
temperature and overall run time on the compressor.
Since my last email, we continue to research ideas on monitoring gas bypass on packings. My Plant Engineer is looking
into installing window sight flow indicators on each cylinder distance piece vent line of the compressors so we can
monitor gas flow on our daily rounds.
Let me know if you need any other information.
Regards,
Zane
From: Ferguson, Victoria L (DOA)[mailto:victoria.ferguson@alaska.gov]
Sent: Tuesday, June 24, 2014 9:15 AM
To: Zane Henning
Subject: RE: Badami flaring events over an hour
Zane,
In our conversation on 6/10/14 you described timing of maintenance, packings wear/gas bypass increasing, temperature
effects on packing, timing of turnarounds, etc. Could you please write a paragraph explaining these issues and the
effects on flaring.
Thanx,
Victoria
Victoria Ferguson
Senior Petroleum Engineer
State of Alaska
Oil & Gas Conservation Commission
333 W. 7th Ave, Ste 100
Anchorage, AK 99501
Work: (907)793-1247
victoria.ferouson cDalaska.goy
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation
Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged
information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended
recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to
you, contact Victoria Ferguson at (907(793-1247 or Victoria.FerausonQalaska qov
From: Zane Henning (mailto:Zane.Henning ansavantalaska coml
Sent: Friday, June 13, 2014 2:30 PM
To: Ferguson, Victoria L (DOA)
Cc: Wayne Kuykendall; CardnoSally Ryan
Subject: Badami flaring events over an hour
Victoria,
Per our conversation this week, I have attached the Modification of Change (MOC) that was performed by BP in 2010
before Savant assumed control at the Badami Unit. It shows how the distance piece vents on the Injection Gas (IG)
compressors have had the case vent lines plumbed directly to the Low Pressure (LP) flare header versus going to
atmospheric roof vents.
Two tests in have been performed, one in 2012 and one in 2013 to ensure that the IG compressors are the source of the
flare gas we are seeing in the reports. Our Instrument Tech installed a vent hose off the LP drain hear downstream of the
distance piece vent header and closed the block valve going to the LP flare. Once the block valve was closed, the gas
flaw to flare stopped. From these tests, it was determined to include the language you see in the flare reports "Small, LP
flare volume coming from the IG compressors packing case vents".
Please see trend we created from ambient air temps and daily flare gas volume. Let's discuss when you have a
moment. Goode Trend: Flare
We have started a new work order to track down which cylinders are producing the most vent gas to flare so we quantify
which cylinders are venting the most gas.
1 want to close with making sure you understand we are not purposely flaring gas to increase throughput of oil. We have
limited gas at Badami to begin with and have to purchase fuel gas from Endicott at certain times. Thanks for bringing this
matter to our attention and I will be sure to get back with you once our trouble shooting is complete.
Regards,
Zane Henning
North Slope Operations Manager
Alternate: Wayne Kuykendall
NS Office: 907.659.1349
Cell: 907.830.7491
Harmony: 5506
Email: Zane.HennineCcDSavantAlaska.com
SAVANT
ALASKA
Savant Alaska LLC. The contents may be privileged and confidential and are intended for the use of the intended
addressees) only. If you are not an intended addressee, note that any disclosure, copying, distribution, or use of the
contents of this message is prohibited. If you have received this e-mail in error, please delete the message from your
mailbox and system, then contact me at 907-830-7491 or by email at Zane. Henning@SavantAlaska.com. Thank you.
Creator: Johnson Larry
2014-01626
ork
rder
etails
ALASKA
Approver position: Maintenance Lead / Planner Contact/Requestor: Henning Zane
Priority: 2. Important
Asset: Badami
WO source: O&M
Description:
IG -Compressors - Investigate gas discharge from the distance pieces to the flare and
establish method to monitor the flow rates.
Functional area: Operations and Maintenance
Work order type: Regulatory
Status: Approved
Comments:
Date and time from: 6/13/2014 12:00:00 AM
Date and time to: 6/30/2015 12:00:00 AM
TASKS
'Task # Position Estimated—We—created Date Closed Title Cost code Equipment -
l
hours
01, Plant Mechanic 24.0 06/13/2014 IG -Compressors - Investigate gas discharge from the distance pieces, 03-000-000-900-1 GAS COMPRESSION
to the flare and establish method to monitor the flow rates - Plant
Mechanic - Install vent hose for testing and assist with testing as
required
Instructions: Install hose to vent gas outside to bleed trailer for testing during suspected flare events.Assist with testing as required
'ompressors - Investigate gas discharge from the distance pi
to the flare and establish method to monitor the flow rates. -
Engineer
GAS
Page 1 of 2
Generated by Savant App / www.savantalaska.com Technical issues: Tex R Us LLC Qa 248.3978
Instructions: Investigate the flaring from the distance pieces. Determine proper monitoring method for flow monitoring of the gas coming out of the distance pieces. Possibly install wireless flow
meter on all of the distance pieces for both IG Compressors. This would allow for better monitoring of where the gas is being vented from and allow for quicker, more precise maintenance
practices.
03 Multi Skilled Plant 12. 06/13/201 IG -Compressors - Investigate gas discharge from the distance pieces 03-000-000-900-1 GAS COMPRESSION
Operator to the flare and establish method to monitor the flow rates. - MSO -
the troubleshooting as
MATERIALS
Catalog Id Description QTY in whse - QTY Date needed Cost code
needed
EQUIPMENT
Catalog Id Tag Id Name Begin End usage Comments
usage date date
MOD -M300 i GAS COMPRESSION - I IG -Compressors - Investigate gas discharge from the distance pieces to the
flare and establish method to monitor the flow rates.
OTHER COSTS
TIMESHEETS
Page 2 of 2
Generated by Savant App / www.savantalaska.com Technical issues: Tex R Us LLC @ 248.3978
Scope of work
Badami IGA, IGB and VRU
Distance piece, packing case vent and drain line piping change
IGA-IGB
1. Add %"piping from the top of each compressor distance piece to a main 1 %a°' vent
line that will run along the base of the compressor to the 1 ' stage blowdown flare
header.
2. Add %:" piping from the packing case vent to the main vent header that will run
along the base of the compressor.
See drawings:
PI-BO-CO0016 sheet 005
BDMI-M300 PI -BO -CO -0015-06 sheet 001
3. In the vent line add two block valves and a check valve for isolation during
maintenance work.
4. Use the existing flanges from the 1st stage blowdown header and re -locate the two
block valve that are normal closed to the upstream side of the header.
5. Add two elbows with flanges to relocate the existing blowdown valves.
6. Add a tee to connect both the new vent line header and the blowdown line to the
flare line
7. Add block valves to each line from the distance piece drain lines that will be
normally closed; these will be opened daily by operations to drain liquids from
the distance pieces.
8. Demolition all the stainless % tubing that is associated to the vent lines and
separate the drain lines from the vent line system.
VRU
1. Add '/2" piping to the packing case vents and run a new vent header pipe to a tee
that can be installed were the flange connects to line 6" —F-123-AA1.3 ,which is
not shown on the drawing see
BDMI-M300 PI -BO -CO 0014-06 sheet 001
Vent line to flare line header PI -BO -CO -0014 -sheet 004
2. Add block valves to the drain lines from the distance piece on each cylinder.
Note: All piping sizes need to field verified from the compressor distance piece to the
flare line header.
It would be preferred to use threaded piping connections if the BP piping specification
allow.
liz
STATE OF ALASKA
ALASKA OILAND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRomm=n r_ec nicor%arri %ki
-
7. Facility Number Z. Facility Name
290000019 gt
Disposition
— - - --------
3. Field
Badami
Volume MCF
v .avI vV, I IVe•
4. O ra(or
Pe 5. Month ear of Dn-13 ion
Savant Alaska LLC Jan -13
20. For production from mulls le
p pools, list contribution of each pool as a percent of Total
Volume.
6. Sold
0
7. Reinjected
799
Pool Name Pool Code Percent
Badami 60100 98.30%
S. Flared or vented 1 hour or less
295
Badami, Oil Undefined 60150 3.70
100.00%
9. Flared or vented mom than 1 hour (see mstr)
1,742
10. Pilot and Purge
403
11. Assist Gas
12. Fuel gas used in lease operations.
1,109
13. Other (see instructions)
ORaal Use Only
Authorization>7 he
Safety
/ 7T�
MCF
14. TOTAL VOLUME (ITEMS 6-13)
4,348
15. NGL Gas Equivalent
Lease Use
MCF
18. Purchased gas
15.892
Conservation
MCF
lNasfe:
MCF
17. Transferred from:
^ /
18. Transferred to: (Empress as a negative #)
Commissioner Date
19. Remarks:
1 hereby cenify that the foregoing is We and torted to the best of my kI Iry Ige.
signaturej� �, l/ r / Note: All volumes must be co":0 to
e Title vice President pressure of 14.65 Asia and to a
' temperature of 60o F. Authority 20
Printed Name William J. Martinez III Phone 720-328-7182 DateAAC25.235.
Folin 10-422 2%9113
January 2013 production allomtien.xisx AOGCC Facility Report
.3 /Zf/ f3
vZ-�--
Unplanned Events Less Than or Equal To 1 Hour
tart Imet,nd I Ime End Date I Plannedme DESCRIPTION OF INCIDENT AND CAUSE CTION TAKEN TO ELIMINATE CAUSE
1/11135:36 20:18 1/1/13 U 102 vents vent gas into the packing case
1/1/13 2:48 5:12 111/13 U 3 vents vent gas into the packing case
TOTAL
114/13 7:54 11:06 1/4/13 U 9 vents vent gas into the packing case
1/5/13
Not required tor events which are less t an or
23:59
1/5/13
U
61
295
Not required for events which are less than or equal to 1 hour I equal to 1 hour
Events Greater Than 1 Hour
UAIL rt Time End Time End Date Fiannert VOLUML tMCt)DESCRIPTION OF INCIDENTAND CAUSE ACTION TAKEN TO ELIMINATE CAUSE
1/11135:36 20:18 1/1/13 U 102 vents vent gas into the packing case
1/1/13 2:48 5:12 111/13 U 3 vents vent gas into the packing case
1/4/13 12:06 13:12 1!4/13 U 2 vents vent gas Into the packing case
114/13 7:54 11:06 1/4/13 U 9 vents vent gas into the packing case
1/5/13
16:00
23:59
1/5/13
U
61
vents
vent gas Into the packing case
1/5/13
1130
14:36
1/5/13
U
9
vents
vent gas into the packing case
1/6/13
19:36
23:59
1/6/13
U
IS
vents
vent gas into the packing case
1/6/13
17:12
19:30
1/6/13
U
7
vents
vent gas into the packing case
1/6/13
0:00
12:24
1/6/13
U
36
vents
vent gas into the packing case
1/7/13
8:48
23:59
1/7/13
U
48vents
vent gas into the packing case
1/7/13
0:00
754
1/7/13
U
24
vents
vent gas into the packing case
1/8/13
0:00
2359
1/8/13
U
94
vents
vent gas into the packing case
119/13
19:06
2359
1/9/13
U
17
vents
vent gas Into the packing case
1/9/13
17:24
19:00
1/9113
U
S
vents
vent gas into the packing case
1/9/13
11:30
13:00
1/9/13
U
5
vents e
I IS S In a, upeldipull on
vent gas into the packing case
1/9/13
090
11:06
1/9/13U
43
vents
vent gas into the packing case
1/10/13
8:30
23:59
1/10/13
U
51
vents
vent gas into the packing case
1/10/13
0:00
7:00
1/10/13
U
22
vents
ven t gas into the packing case
1/11/13
0:00
2359
1/11/13
U
81
vents
vent gas into the packing case
1/12/13
0:0018:48
1/12/13
U
185
vents
vent gas intothepackin g case
January 2013 production allocation.xlsx, AOGCC Flaring report
1/13/13
19:06
22:06
1/13/13
U
157
ant SD—PL Issue
Troubleshooting PLC System
1/13/13
13:06
14.24
1/33/13
U
3
vents
vent gas into the packing case
1/13/13
4:54
6:30
1/13/13
U
10
vents
vent gas into the packing case
1/21/13
14:36
2359
1/21/13
U
29
vents
vent gas into the packing case
1/22/13
DOD
2359
1/22/13
U
71
vents
vent gas into the packing case
1/23/13
0:00
2359
1/23/13
U
70
vents
vent gas into the packing case
1/24/13
0:00
2359
1/24/13
U
73
vents
vent gas into the packing case
1/25/13
0:00
2359
1/25/13
U
88
vents
vent gas into the packing case
1/26/13
0:00
23:59
1/26/13
U
81
10 tu I 31.00M
vents
is 0,121110M,
vent gas into the packing case
1/27/13
0:00
23:59
1/27/13
U
96
5111al, CP
vents
vent gas into the packing case
1/28/13
0:00
2359
1/28/13
U
89
vents
vent gas into the packing case
1/29/13
0:00
2359
1/29/13
U
70
vents
vent gas into the packing case
1/30/13
0:00
23:59
I/30/13
U
86
vents
vent gas Into the packing case
TOTAL
1,74
Planned Events less Than or Equal To 1 Hour ANO Not Exceeding 5,000 mcf
rt Time n me
n Date Plannedme
IN
DESCRIPTION OF INCIDENT 7M CAUSE CTION TAKEN TO ELIMINATE CAUSE
TOTAL
Not required for planned events which are less than or equal Not required for planned events which are less
to 1 hour than or equal to 1 hour
Panned Events Exceeding 1 Hour OR Exceeding 5,000 me
DAM 15tartrime EndTme End Date MaFnecl VOWME (mcf)DESCRIPTION OF INCIDENT AND CAUSE[ACTION TAKEN TO ELIMINATE CAUSE
TOTAL
G"NOTOTAL 2,037
January 2013 production allotation.xin, ADGCC Flaring report
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRonurFn re -q nmOnciTinu
----
1. Facility Number 2. Facility Name
290000019 at
Disposition
-- - --------..v....
3. Field
Becalm
Volume MCF
VVIlIl I�
4. Operator 5. Mcnthlyear of Disposition
Savant Ataska LLC I Feb -13
20. For production from multiple pools, list contribution of each pool as a percent or Total
Volume,
6. Sold
Pool Name Pool Code Percent
7 Reinjected
76
Badami 60100 96.27%
Badami, Oil Undefined 60150 3,730
B. Flared or vented 1 hour or less
104
100.00'
9 Flared or vented more than 1 hour (see instr.)
2,078
10. Pilot and Purge
364
11. Assisi Gas
12. Fuel gas used in lease operations.
700
13. Other (see Instructions)
Official Use Only
Authorization hr:
Safety
�i
f 7S
f D
MCF
74. TOTAL VOLUME (ITEMS 6-13)
3,323
Lease Use
MCF
15. NGL Gas Equivalent
Conservation
MCF
t6. Purchased gas
75.458
Waste:
MCF
17 Transferred from'.
Commissioner Date
18 Trarsfemed to: (Express as a negative 0)
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected to
Signature ��,11 li,� _ rile Vice President pressure Of 14.65 psis and to a
temperature of 600 F Authority 20
Printed Name William J. Martinez III Phone 720-326-7182 Date 3120113 AA C25.235.
Fnr 1n -d99
February 2013 production allocation.xlsx AOGCC Facility Report
VLA
312-9 /13
Unplanned Events Less Than or Equal To 1 Hour
DATE Start Time
End Time End Date Planned
I VOLUME (mcf) I ESCRIPTION OF INCIDENT AND CAUSE CTION TAKEN TO ELIMINATE CAUSE
End Date
TOTAL
Not required for events whit are esst an or
104 Not required for events which are less than or equal to 1 hour equal to 1 hour
Events Greater Than 1 Hour
DATE
Start Time
End Time
End Date
Planned
VOLUME (mcf)
DESCRIPTION OF INCIDENT AND CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
Small, LP flare volume coming from the IG compressors packing case
This is normal operation for the compressors to
2/5/1
6:1
23:5
2/5/13
U
42
vents
vent gas into the packing case
Small, LP flare volume coming from the IG compressors packing case
This is normal operation for the compressors to
2/6/1
0:0
23:5
2/6/13
U
58
vents
vent gas into the packing case
Small, LP flare volume coming from the IG compressors packing case
TF7 T7is normal operation for the compressors to
2/7/1
O:OC
23:5
2/7/13
U
64
vents
vent gas Into the packing case
Small, LP flare volume coming from the IG compressors packing case
This is normal operation for the compressors to
2/8/1:116:4
23:0
2/8/13
U
115.verts
vent gas into the packing case
Small, LP flare volume coming from the IG compressors packing case
This is normal operation fort a compressors to
2/8/1
14:5
16:2
2/8113
U
3
vents
vent gas into the packing case
Small, LP flare volume coming from the IG compressors packing case
This is normal operation for the compressors to
2/8/1
0:00
3:0
2/8/13
U
7
vents
vent gas into the packing case
Small, LP flare volume coming from the IG compressors packing case
This is normal operation for the compressors to
2/11/1
22:1
23:59
2/11/13
U
5vents
vent gas Into the packing case
IG -A COmDr. 00wn due to unknown causes theproblein is still under
2/11/1
15:42
22:12
2/11/13
U
363
review
Investigation ongoing to eliminate the problem
Small, LP flare volume coming from the IG compressors packing case
This is normal operation for the compressors to
2/12/13
21:0
23:5
2/12/13
U
vents
vent gas into the packing case
Small, LP flare volume coming from the lG compressors packing case
This is normal ope,atlon for the compressors to
2/12/1
4:2
14:0
2/12/13
U
22
vents
vent gas into the packing case
Small, LP flare volume coming from the IG compressors packing case
This is normal operation for the compressors to
2/12/13
0:0
1:2
2/12/13
U
91
vents
vent gas into the packing case
Small, LP Flare volume comingfrom the IG compressors packing case
This is normal operation forthe compressors to
2/13/13
20:4
22:
2/13/13
U
2
vents
vent gas into the packing case
Small, LP flare volume coming from the IG compressors packing case
This is normal operation for the compressors to
2/13/13
0:4
18:4
2/13/13
U
45
vents
vent gas into the packing case
Small, LP flare volume coming from the IG compressors packing case
This is normal operation for the compressors to
2/14/13
4:1
15:5
2/14/13
U
3
vents
vent gas into the packing case
Small, LP flare volume coming from the IG compressors packing case
This is normal operation for the compressors to
2/14/1
2:5
4:1
2/14/13
U
I
vents
vent gas into the packing case
Small, LP flare volume coming from the IG compressors packing case
This is normal operation for the compressors to
2/17/13
14:2
23:5
2/17/13
U
27
vents
vent gas into the packing rase
Small, LP flare volume coming from the IG compressors packing case
This is normal operation for the compressors to
2/18/13
0:0
23:5
2/18/13
U
74
vents
vent gas into the packing case
Small, LP flare volume coming from the IG compressors packing case
This is normal operation for the compressors to
2/19/13
0:
16:3
2/19/13
U
59
vents
vent gas Into the packing case
Small, LP flare volume coming from the TGcompressorspackingcaze
This is normal operation for the compressors to
2/19/13
16:4
23:5
2/19/13
U
2
vents
vent gas into the packing case
Small, LP flare volume coming from the IG compressors packing case
This is normal operation for the compressors to
2/20/13
0:0
8:2
2/20/13
li
3
vents
vent gas into the packing case
february 2013 production allocation.xlsx, AOGCC Flaring report
Planned Events Exceeding 1 Hour OR Exceeding 5,000 mcf
DATE Start Time End Time I End Date IPlanned
1VOLUME(ni DESCRIPTION OF INCIDENT AND CAUSE CTION TAKEN TO ELIMINATE CAUSE
TOTAL
0
IG -e compressor down because of low low PSI and ensuing plant
2/20/13
8:2
13:2
2/20/13
U
163
upset
Normaled plant backup. final fixes yet to come
Small, LP flare volume coming from the IG compressors packing case
This is normal operation for the compressors to
2/20/13
13:2
23:5
2/20/13
U
4
vents
vent gas into the packing case
Small, LP flare volume coming from the IG compressors packing case
This is normal operation for the compressors to
2/21/1
0:0
6:5
2/21/13
U
2
vents
vent gas Into the packing case
Small, LP flare volume coming from the IG compressors packing case
This is normal operation for the compressors to
2/21/13
7:0
17:4
2/21/13
U
44
vents
vent gas into the packing case
Small, LP flare volume coming from the IG compressors packing case
This is normal operation for the compressors to
2/21/13
17:4
23:59
2/21/13
U
26
vents
vent gas into the packing case
Small, LP flare volume coming from the IG compressors packing case
This is normal operation for the compressors to
Z/2z/13
0:0
13:45
2/22/13
U
57
vents
vent gas Into the packing case
Small, LP flare volume coming from the IG compressors packing use
This is normal operation for the compressors to
2/22/13
13:4
23:5
2/22/13
U
41
vents
vent gas into the packing case
Small, LP flare volume coming from the IG mpreisors packing use
This is normal operation for the compressors to
2/23/1
0:0
23:5
2/23/13
U
10
vents
vent gas into the packing case
Small, LP flare volume coming from the IG compressors packing use
This is normal operation for the compressors to
2/24/1
0:0
23:5
2/24/13
U
107
vents
vent gas Into the packing use
Small. LP flare volume coming from the IG compressors packing case
This is normal operation for the compressors to
2/25/13
0:0
17:18
2/25/13
U
75
vents
vent gas into the packing case
Small, LP flare volume coming from the IG compressors packing case
This Is normal operation for the compressors to
2/25/1
17:4
23:5
2/25/13
U
27
vents
vent gas into the packing case
Small, LP flare volume comi ng from the IG compressors packing case
This is norma l operation fo r the compressors to
2/26/1
0:
23:5
2/26/13
U
108
vents
vent gas into the packing case
Small, LP flare volume cc ming from the IG compressors packingcase
This is normal operation for the compressors to
2/27/1
0:0
14:22
2/27/13
U
65
vents
vent gas into the packing case
This was a plant shutdown event caused by a fire
2/27/1
14:2
20:2
2/27/13
U
20
Plant BESD and upset processes
alarm indication
Small. LP flare volume coming from the IG compressors packing case
This is normal operation for the compressors to
2/27/13
20:21
23:5
2/27/13
U
4
vents
vent gas into the packing case
Small, LP flare volume coming from the IG compressors packing case
This is normal operation for the compressors to
2/28/13
1:12
3:5
2/28/1
U
5
vents
vent gas into the packing case
TOTAL
2,078
Planned Events Exceeding 1 Hour OR Exceeding 5,000 mcf
DATE Start Time End Time I End Date IPlanned
1VOLUME(ni DESCRIPTION OF INCIDENT AND CAUSE CTION TAKEN TO ELIMINATE CAUSE
TOTAL
0
GRAND TOTAL 1
1 2,183
February 2013 production alloca:ion.�lsa, AOGCC Flaring report
STATE OF ALASKA
ALASKA OILAND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCFn c,ns nigpnciTenN
1. Facility Number2, Facility Name
290000019 B1
Disposition
3. Field
Badami
Volume MCF
4. Operator 5. Monthlyear of Disposition
Savant Alaska LLC Mar -13
20. Forproduction from multiple pools, list contribution oteach pool as a percent of Tota!
Volume.
6, Sold
0
Pool Name Pool Code Percent
7. Reinjected
294
Badami 60100 95.68%
Badami, Oil Undefined 60150 4.32%
8. Flared or vented 1 hour or less
314
100.00%
9. Flared or vented more than 1 hour (see instr.)
1,603
10. Pilot and Purge
403
11. Assist Gas
12. Fuel gas used in lease operations.
1.734
13. Other (see instructions)
Olffclal Use Only
Authorization >1 hr.
Safety
�3
MCF
14. TOTAL VOLUME (ITEMS 6-13)
4,348
Lease Use
MCF
15. NGL Gas Equivalent
Conservation
MCF
16, Purchased gas
17,554
Waste:
MCF
17. Transferred from.
3 —1
T
18. Transferred to: (Express as a negative #)
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
;%��i Note: All volumes must be corrected to
Signature i/I01 c ) /% Tide Vice President pressure Of 14.65 Asia and to a
temperature of 60o F. Authority 20
Printed Name William J. Martinez III Phone 720-328-7182 Dale 4/16/13 AA C25.235.
c..r... 1n All
March 2013 production allocation.xisz AOGCC Facility Report
VIF
/,/ialJ3
Law
TOTAL 1 1 314 1 Net required for events which are less than or equal to 1 hour Iequal to 1 hour
Events Greater Than -iHour
DATE
Stan Time
End Time
End Date
Planned
VOLUME (mcf)
DESCRIPTION OF INCIDENT AND CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
3/2/13
16:00
18:56
3/2/13
U
]
Small, LP flare volume coming from the IG compressors packing case
This is normal operatlon for the compressors to
vents
vent gas into the packing case
3/2/13
19:14
23:59
3/2/13
❑
Small, LP are volume com
mining from the IG compressors packing case
This is normal operation for the to
ress
11
vents
vent gas into the packing case
3/3(13
17:00
20:06
3/3/13
U
Small, LP flare volume coming from the ll, compressorspaukingcase
This is normal operation for the compressors to
4
vents
vent gas i aro the packing case
3/3/13
9:00
10:46
3/3/13
U
Small, LP flare volume mining from the IG compressors packing case
This is normal operation for the compressors to
3
vents
vent gas into the packing case
3/3/13
0:00
8:54
3/3/13
U
Small , LP flare volume coming from the IG compressors packing case
is is normal operation for the compressors to
IB
vents
vent gas into the packing case
3/4/13
8:09
18:48
3/4/13
U
Small, LP Flare volume coming from the IG compressors packing case
This is normal operation forthe compressors to
24
ants
vent gas into the packing case
3/4/13
5:26
B:OB
3/4/13
U
VRU ESD on low suction pressure. Had a hard time getting it
We performed some maintenance, cleared some
149
restarted
Squid from scrubbers, and restarted
3/5/13
1:42
5:42
3/5/13
Small, LP flare volume coming from the IG compressors packing case
This is normal operation or the compressors to
U
5
vents
vent gas into the packing case
3p/13
14:36
23:59
3/]/13
U
154
Plant issues with PLC being resolved to bring back
PIC- 14032nd stage vent to flare
to full operation.
3/8/13
12:18
16:06
3/8/13
U
Small, LP flare 70lume7OM77g omthe IG compressors packing case
This is normal Operationor the compressors to
5
ants
vent gas into the packing case
3/8/33
]:IB
11:18
3/8/13
U
Small, LP flare volume coming from the lG compressors packing case
This is normal operation forthe compressors to
70
vents
vent gas into the packing case
3/8/13
0:00
6:12
3/8/13
U
Small, LP flare volume coming from the IG compressors packing case
This is normal operation for the compressors to
18
ants
vent gas into the packing case
3/9/13
10:54
23:59
3/9/13
U
Small, LP flare volume coming from the IS compressors packcase
packing case
This is norma operation for the compressors to
23
vent gas into the packing case
3/10/13
1144
1 15:36
3/10/13
P
106
VRU manually shut down for maintenance
Completed maintenance work & restarted VRU
3/10/13
0:00
20:36
3/10/13
U
Small, LP flare volume coming from the IG compressors parking case
This Is normal operation for the compressors to
25
vents
vent gas into the packing case
3/11/13
12:12
18:18
3/11/13
U
Small, LP flare volume com Ing from the IG compressors packi ng case
This is normal operation for the compressors to
it
vents
vent gas into the packing case
3/12/13
12:30
23:59
3/12/13
U
Small, LP flare volume coming from the IG compressors packing case
This is normal operation for Me compressors IO
43
vents
vent gas into the packing case
3/13/13
19:42
23:59
3/13/13
U
Small. LP are volumecoming from me IG compressorspacking case
This is normal operation orthe compressors to
11
vents
vent gas into the packing case
3/13/13
16:12
17:24
3/13/13
U
Small, LP Flare volume coming from the IG compressors packing case
This is normal operation for the compressors to
2
vents
vent gas into the packing case
3/13/13
0:00
16:06
3/13/13
U
52
Small, LP flare volume coming from the IG mres
mpsos- packing case
This is normal operation forthe compressors to
vents
vent gas into the packing case
3/14/13
22:30
23:59
3/14/13
U
3
Small, LP flare volume coming from the IG compressors packing case
Thisls normaloperatlon for the compressors to
vents
vent gas into the packing case
3/14/13
000
15:06
3/14/13
U
41
Small, lP Flare volume coming from the IG compressors packing case
This is normal operation for the compressors to
vents
vent gas Into the packing case
March 2013 production allocation.ales, AOGCC Flaring report
3/15/13
0:00
9:00
3/15/13
U
24
Small, LP flare volume Coming from the IG Compressors packing case
This is normal operation forthe compressors to
GRANDTOTAL
1,918
vent
vent gas into the packing use
3/18/13
22:30
23:59
3/18/13
U
Small, LP flare volume coming from the IG compressorspacking case
This isnormal operation for the compressors to
2
vents
vent gas into the packing use
3/18/13
1012
14:36
3/18/13
U
Small, LP flare volume coming from the IG compressors packing case
This is normal operation r the compressors to
12
vents
vent gas into the packing case
3/18/13
5:06
1006
3/18/13
U
Small, LP flare volume coming from the IG compressors p ing Case
is is norma operation for the compressors to
31
vents
vent gas into the packing use
3/19/13
0:00
23:59
3/19/13
U
72
Small, LP flare volume coming from the IG compressors packing case
This is normal operation far t7. compressors to
vents
vent gas into the packing use
3/20/13
0:00
9:30
3/20/13
U
Small, LP are volume coming from the G compressors packing case
This is normaloperation ort ecompressors to
29
vents
vent gas into the packing use
3(21/13
14:06
19:00
3/21/13
U
9
Smal I, LP flare volume coming from the IG com pressors packing case
This is normal operation for the compressors to
vents
vent gas into the packing use
3(22/13
14:18
23:59
3/22/13
U
Small, LP are volume coming from the IG compressors packing case
This is normal operation orthe compressors to
32
vents
vent gas into the packing use
3/22/13
5:46
10:26
3/22/13
U
Small, LP are volume comm ingfrothe lG compressors packi ng case
This is normal operation or the compressors to
9
vents
vent gas into the packing use
3/23/13
0:00
23:59
3/23/13
U
86
Small, LP flare volume coming from the IG compressors packing case
This is normal operation orthe compressors to
vents
vent gas into the packing use
3/20/13
0:00
23:59
3/24/13
U
Small, LP flare volume coming from the IG compressors packing case
This isnorma operation or the compressors to
95
vents
vent gas into the packing use
3/25/13
0:00
23:59
3/25/33
U
Small, LP flare volume coming from the IG compressors packing case
This is normal operation for the compressors to
83
vents
vent gas into the packing use
3/26/13
0:00
23:59
3/26/13
U
91
Small, LP flare volume coming from the IG compressors packing case
This is normal operation or the compressors to
vents
vent gas Into the packing case
3/2]/13
0:00
23:59
3/D/13
U
Small, LP flare volume coming from the IG compressors pack
packing case
erati
This is nwmaI opon r the compressors to
96
vents
vent gas into the packing case
3/28/13
0:00
23:59
3/28/13
U
Small, LP flare volume coming from the IG c.compressors packing case
This is normal operation forthe compressors to
88
vents
vent gas Into the packing case
3/29/13
000
23:59
3/29/13
U
Small, LP Tare volume coming from the IG compressors packing case
Thisisnoeratioor
rma opn the compressors to
]9
vents
vent gas into the packing case
3/30/13
22:02
23:59
3/30/13
U
3
Small, LP flare volume coon Ing from the IG compressors packi ng case
This isnorma operation for the compressors to
vents
vent gas into the packing case
3/30/13
0:00
19:48
3/30/13
U
Small, tP flare volume coming from the IG compressors packing case
This is normal operation for the compressorst
51
vents
vent gas into the packing use
3/31/13
11:48
16:54
3/31/13
U
Small, LP flare volumace ing om the IG compressors packing case
This is normaloperation or the compressors to
9
vents
vent gas Into the packing case
TOTAL
1,603
Planned Events Exceeding I Hour OR Exceeding 5,000 and
DATE Start Time End Time I End Date I Panned
VOLUME(m DESCRIPTION OF INCIDENT AND PAUSE CTION TAKEN TO ELIMINATE CAUSE
TOTAL
O
GRANDTOTAL
1,918
March 2013 pl.ducV. ailocatgn.visy ADGCC Flaring report
STATE OF ALASKA
ALASKA OILAND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
200000Dt9
2. Facility Name3.
Bi
Field
Badami
4. Operator
Savant Alaska LLC
S. MonthNear of Disposition
Apr -13
Disposition
Volume MCF
20. For production from multiple pools, lest contribution of each pool as a percent of Total
volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
646
Badami 60100 96.53%
Badami, Oil Undefined 60150 3.479
e. Flared or vented ihour or less
180
00.001
9. Flared or vented more than 1 hour (see instrJ
827
10. Pilot and Purge
390
11. Assist Gas
12. Fuel gas used in lease operations.
1,156
13. Other (see instructions)
._ Official Use Only
Authorization >l hr
Safety
p 2
!l
MCF
14. TOTAL VOLUME (ITEMS 6-13)
9,199
Lease Use
MCF
15, NGL Gas Equivalent
Conservation
MCF
16. Purchased gas
11,287
Waste:
MCF
17. Transferred from:
k-13-/3 _ / 3 — /
t�
18. Transferred to: (Express as a negative #)
Commissioner Date
19. Remarks:
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
//y/�� Note: All volumes must be corrected to
Signature %. J(//( Tile Vice President pressure of 14.65 psia and to a
/ temperature of 60o F. Authority 20
- AAC25.235.
Printed Name Wiliam J. Martinez III Phone 720-328-7182 Date 5/15113
Form 10-422
April 2013 production allocatlon.xlsx AOGCC Facility Report
V1 -f --
61l7 /) 3
Unplanned Events Leas Than or Equal To 1 Hour
DATE Start Time
End Time
End Dale Planned VOLUME mcQDESCRIPTION
OF MOMENT AND CAUSE C710N TAKEN TO ELIMINATE CAUSE
Planned
VOLUME (.Cf)
TOTAL I I IN
_
r evesvkm are esa an or
Not reWlre o nt
INotrequiredfor events which are less than orequal to l hour equal to lhour
Everts Greater Than 1 Nam
DATE
Start Mine
End Time
End Date
Planned
VOLUME (.Cf)
DESCRIPTION OF INCIDENT AND CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
0/1/13
2136
13:59
4/1/13
U
4
This Ia normal operation$ far the campressOnto
Small, WR..coming from one IG wrprousorspazking Wass
venlimothe Wckingcases
0/1/13
11:18
15:58
0/1/13
U
d
This 6 her ed aperatlam for the comPreswrs W
Small, LP flan coming from the IG compressors packing cams
verritiolothepackrucates
4/1/13
5:36
7:36
4/1/13
u
6
Thku normaloperamm fee the rommessms to
Small, LP flare WMIN from the iG compressors packing cases
veMlntolhepackinge..
6/U13
2:12
490
4/1/13
U
aThlz
merrs to
as maim.?op.rarom, for Ne roesse
Small. LP fare emirg from the IG compressors WckMg cases
vent into the packing cases
4/2/13
19:24
2359
4/2/13
U
]5
This la normal operation for the commeewrs to
Small, LP flare aming from the IG compressors packing cases 1vamt
into the pa,ld, .sea
4/2/13
14:30
19:12
4/2113
U
16
This is normal Pperatmnz for the comenhoars to
Sma11, LP Rare perning, from the IG rompm—a maingcaase
—11. the packing cases
4/2/13
0:00
12AIR
4/2/13
U
37
ThuunenaloperadWz for the compreean,W
Small, IP Rare other, from the IG eempevmn tacking came
vent into tin packing caws
41/3/13
5:42
17:18
4/3/13
U
31
Thin normal operations lcr the campresson to
Small. LP flare coming frem the IG amprossms Packing caws
vent Into the packing sans
4/3/13
090
SW
4/3/13
U
15
This is mmaloperation. for the cempremen to
Small, LP Rare .mire from the lG compressors Wckmg taws
ventlmethe Wca�g caws
4/4/13
13:12
23:59
4/4/13
U39
oeal op othme fort compmsn wto
This a nme
Small, LP Pon coming from the I rompresears pecking cases
vent into the Packing cases
4(4/13
6:18
062
0/4/13
U
6
is b normal .parabens for the comprezwnto
Small, LP Mrc coming ft. ! tie IG commremrs peeking cams
vent into the parking uses
4/5/13
14:06
16:36
4/S/13
U
d
This is normal Operations for the commssson to
Small, LP Rare ..in from the iG compressors pending -.a
ve !ere the Packing eases
4/5/13
12:00
13:00
4/5/13
U
1
his'a normal operations for the compressors to
Small, LP Rare coming from In IG ..p.m. packing catts
vent into the packing cases
41/5/13
0:00
]090
4/5/13
V
29
TNS is recent operations lar the compothere m
SmaiI, LP Dare coming tram the IG co mpreason packing caws
vent into the pectin{ Wass
Plant SEW caused by more litl failure and subaeauent psi rekase in
4/6113
16:30
23:59
9/6/13
U
91
MA00. Vestals comuel W vent to flare while plant was ponied fir
Redeemed the plant after the mablem area was
a wfe restart
sated cam and investigated
4/6/13
3:24
11:18
4/6/33
U
18
This is normal operations for the ampresmnto
Small, heflam romans from the IS rompmsmus tackins,
vent into Vie packing cases
417113
(k90
23:59
4/7/13
I)
6.5
Thisisrormal operotians 777,7c0mpresasrsan
Smal4 LP flare coming from the IG cempressan Peckingcatts
vent Into the packing cases
410/13
22:62
23:59
418113
U
3
This i6 mmoval operafionz In, the Wmpnumme to
m
SAIL 1P Rareming frem the IG escommuprz Packing cases
vent Into the packing cases
4/8/13
000
21:18
418/13
U
We a normal m ecatinns or the compres ersa.
Strall, Lie Rare coming team the IG compressors neding cans
vim into the Packing cases
4/9/13
0:00
6:00
4/9113
U
13Thisis
normal operations; for the compressors to
Snell, LP Rare coming from tin lG oompresmrs packing eaves
vart into the packing caws
6/10/13
1054
12:00
4/10/13
U
3
This is normal operations for the amPressore 19
mall tir flare coming from the IG compression packing cases
want into the pacing cases
1/10/13
7:SB
9:54
4/30/33
U
6
TIS is corned naralianv forahe <emprezmrs he
3malk LP&toeo ming frownnn
m the IG mpopacking cami
vent Into the making s
rase
4/10/13
0:36
5:54
4/30/13
10
Title I. romedoperations for the wmpreawrs to
Smalt LP flim coming from the IS compressors PedUng alts
ventimathepackincems
d/]1/13
11:54
2359
4/11/13
U
32
This h normal opentiom for the compressors es
Small, LP Ran comity from the IS compremors parking caws
vent into the packing Wass
scan 2013 moduNon Apsatienglu. 4o cradngreport
4/11/13
6F2
10:36
4/11/13
U
8
Not required for planned everdcerhitlr are less than crequal Notrequirea T.Ipmnnedevemwhkhareims
TOTAL to 1 hour than or equal M 3 hour
This is normal operetions the compresmrsW
GBANOTOTAL
IA07
Smaq LP If... coming from the IG compressors pa&Ingcause,
vent into the parMtg cases
4/11/13
054
296
a/33/13
V
1
This is normal operations for the compreswraw
mall, LP flan coming form the IS wmpnssers packing cases
vent into the packing cases
4/12/13
14:30
20:42
4/33/33
U
11
This is normal operations fort the orr prams to
Small, LP flare coming from the lG compressors packing cases
somme, the peeMrg<aws
4/12/]3
0:00
12:00
4/12/13
U
34
Is is —,..I operations ort compressors to
Small, LP lure coming from the IS ismpnscors packing taus
vent into the pal ores
4/13/13
11:39
18:54
1(13)13
U
6
Tho IS norma opeo4ws for the compresmrs w
Small, LP Paris coming from W9 lG compressors pakhg cases
vent into the packing cases
4/13113
9:10
13:35
4/33/13U
]
s s.—Iripentionsforthecompnsmrsto
Small, 1p Pahe comilgfromthe IS wmpmemnpaekingcaws
vent Into the packing uses
4/19/13
13:06
1a96
4/]11/13
U
9
This a rromrelonionskins Mr the <ompm.m7
Small, V here ramim from the 16 compresmrs pa&fn¢cases
vent3nto'he packing uses
0/35/13
14:06
18:18
4/35/13
U
)
This is normal operenons forthe compnsmn es
Srtwq LP flare coming from the IS compressors parguing uses
vent, Ines the packing cases
4/15/13
1234
1354
4/15/13
V
1
Is is nems.] aperetlons ler his, compressorsor
Small, LP Pan coms, from the IG—,nosonp ckirs, usesv
ent hour the pacases
ses
1/D/13
1318
4:36
4(1]/13
U
3
This a compression operations for the compresn to
Somali, Wflare coming home the IS wmpramrs paling sews
ventI. the leading cases
4/22/13
12:42
16:06
4/22/13
P
13
Saflupping HS compesesn phesmdn, up I&B and deprergrom, IG -A
seepofwmpressom
1/24/13
21:12
23:59
4/4/13
V
fi
isnormal operations for compresmrs to
Small, lP Pan comingform the IG wmprettors paeMn,wus
o the pe&leg rows
4/24/13
16ID8
19:36
4/24/13
U
)
nomal alienations for the compresmrs to
Small, LP flan coming from the IG compressors pecking rows
o We packing woes
4/4/13
14:18
15:54
4/14/13
U
4
nomal operations ,tecompressorsSmall,
Fh
LP flare comes, from the lG co p.ssws packing cases
M the packing cases
4/24113
11:36
13:48
4/24/13
U
3
wrrreloperationsartewmprcsmnWto
the parkiM saws4/24/13
1:30
5:00
4/24(13
U
9
.—I openthm, for We cmpresmrs to
Small, LP flare coming from the lG compressors Packingcases
to the pee4lne uses
4/25/13
22:18
090
4/25113
U
4
T his is rormtl operations for the wmpresmn to
soal{LPflawcoming from the IS campnsmn packing cases
vemmm We packing rases
4/25/13
ow
16:54
4/25/13
u
53
This is normal operations for the compressarsw
5.11, LP Rare coming from the IG wmp.,s q&I, cases
vent iota the pecking ores
4/26/13
090
6*5
4/26/13
V
17
his is.arms apeirticns for the camprettOrsM
SmaII,IPflan comm from the IS compressors "ding area
vem into the peeking taus
4/21/13
6:00
2369
4/2)/13
U
5)
This ir me I a"rations for the compresmrs M
small, LP Oahe coming from We MG ormpmsams pa ding uses
or into lM packing cases
4/28113
0:00
11:36
1/28/13
a
38
his is wrmal operations for the compresmnM
Small, LP flares ming from the IG wmphessers picking cases
vent MM the packing caws
4/39/13
13:54
15:00
4/]9/]3
U
1
his h srormal operations for Me compresmnur
Small, LP Pares ming from the lG rompnssys orcin, cares
vent into the packle, sus
4/39/13
4:30
6,48
q/29/13
U
5
Thiriswrmalopentiomforthewmpressorsto
mall, Lis Pam coming fmm the IS compression packin,orms
vent Ines the packing cases
TOTAL
827
pliflu ed Events Eess Than or Equal To 3 Hour ANO Not Exceeding 5,000 mcf
DATE StartTime
End Time
End Pate Planned VOLUMEImef) DESCRIPTION OFMCIDENTAND CAUSE CTTONTAKEN TO ELIMINATE CAUSE
TOTAL
0
Not required for planned everdcerhitlr are less than crequal Notrequirea T.Ipmnnedevemwhkhareims
TOTAL to 1 hour than or equal M 3 hour
planned Events EaceedI? l MOpr OR Eueedlrrg 5,000 mcf
OATS SdrtTime Entl lime End Date Planned
VOLUMEmc DESCRIPTION OF INCIDENfANII CAUSE CITONTAKENTOELIMINATECAUSE
TOTAL
0
GBANOTOTAL
IA07
Agll 2013 pratluNon allpn9m,tlA AOG X Freing report
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name
290000019 B1
Disposition
3. Field
Batlami
Volume MCF
4. Operator 5. Month/Yearof Disposition
SavantAlaska LLC Ma -13
20. For production Irom multiple pools, list mmribution of each pool as a percent of Total
Volume.
6. Sola
0
Pool Name Pool Code Percent
7. Reinjected
1,519
Badami 60100 96.93%
Batlami, Oil Undefined 60150 3,07%
8. Flared or vented 1 hour or less
118
100.00%
9. Flared or vented more than 1 hour (see instr)
531
10. Pilot and Purge
403
11. Assist Gas
12. Fuel gas used in lease operations.
4,720
13. Other (see instructions)
Official Use Only
MCF
Authorization >1 hr:
Safety
14. TOTAL VOLUME (ITEMS 6-13)
7,591
Lease Use
MCF
15. NGL Gas Equivalent
Conservation
MCF
16. Purchased gas
11,587
Waste.
MCF
17. Transferred from:
— —
Commissioner Date
18. Transferred to: (Express as a negative a)
19. Remarks:
I hereby certify that the foregoing is trueand correct to the best
�of"myy knnowledge.
"/ ��/'i9�[�-. /_—_ Note: All volumes must be Corrected to
Signature i - Title Vice President pressure of 14.65 psia and to a
f
temperature of 600 F. Authority 20
Printed Name William J. Martinez IIIAAC25.235.
Phone 720-3287182 Date 6/20113
Fnr I!1_d'19
May 2013 production allocation.xlsx AOGCC Facility Report
°tjl3 /i 3
Unplanned Events Less Than or Equal To 1 Hour
DATE Start Time
End Time End Date
Planned
VOLUME (m
DESCRIPTION OF INCIDENT AND CAUSE CTiON TAKEN TO ELIMINATE CAUSE
VOLUME (mcf)
TOTAL
ACTION TAKEN TO ELIMINATE CAUSE
119
Not require or events w Ic are ess t an or
Not required for events which are less than or equal to 1 hour equal to 1 hour
Events Greater Than 1 Hour
DATE
StartTime
End Time
End Date
Planned
VOLUME (mcf)
DESCRIPTION OF INCIDENT AND CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
5/1/13
2:00
23:59
5/1/13
U
ea
This is normal operations for the compressors to
Small, LP flare coming from the IG compressors packing cases
vent into the packing uses
5/2/13
21:00
23:59
5/2/13
U
SO
This is normal operations for the compressors to
Small, LP flare coming from the IG compressors packing cases
vent Into the packing cases
5/2/13
0:00
19:48
5/2/13
U
73
This is normal operations for the compressors to
Small, LP flare coming from the IG compressors packing uses
vent into the packing cases
5/3/13
14:36
16:06
5/3/13
U
2
This is normal operations for the compressors to
Small, LP flare coming from the IG compressors packing cases
vent Into the packing uses
5/3/13
13:06
14:30
5/3/13
U
3
This is normal operations for the compressors to
Small, LP flare coming from the IG compressors packing cases
vent into the packing uses
5/3/13
0:00
12:54
5/3/13
U
46
This is normal operations for the compressors to
Small, LP flare coming from the IG compressors packing cases
vent into the packing uses
5/10/13
11:0013:18
5/10/13
U
Plant shut down during Gas Head detector calibration because It was
The turbine was restarted and the plant was
102
not adequately bypassed
brought back Into production
5/13/13
19:18
23:59
5/13/13
U
9
This is normal opeutions for the compressors to
Small, LP flare coming from the IG compressors packing cases
vent into the packing uses
5/14/13
0:00
15:24
5/14/13
U
50
This is normal operations r the compressors to
Small, LP flare coming from the IG compressors packing uses
vent into the packing cases
Flare was a result of a wrong set point on a recycle valve which
5/15/13
16:43
23:59
5/15/13
U
21
regulates the pressure on the gas boot. The recycle pressure was set
to 15 PSI, which is the same set point as the flare valve off the gas
boot
This was realized and corrected at 0259 on 5-16-13
Flare was a result of a wrong set point on a recycle valve which
5/16/13
0:00
3:42
5/16/13
U
21
regulates the pressure on the gas boot. The recycle pressure was set
to 15 PSI, which is the same set point as the flare valve off the gas
boot
Put the set point back to a normal setting of 12 PSI
Since the compressor shut down, the turbine was
taken off-line to test the black start capabilities of
5/31/13
14:54
17:30
5/31/13
U
109
the new emergency generator. Once the testing
IG -B compressor shut down during well testing due to LLP on BI -18
was over the plant was brought back into
G/L
production
TOTAL
531
Planned Events Less Than or Equal To 1 Hour AND Not Exceeding 5,000 mcf
DATE Start Time
End Time
End Date Planned VOLUME (mcf) DESCRIPTION OF INCIDENT AND CAUSE CTION TAKEN TO ELIMINATE CAUSE
Not required for planned events which are less than or equal Not required for planned events which are less
TOTAL to 1 hour than or equal to 1 hour
May 2013 production allocationAu, AOGCC Flaring report
Planned Events Exceeding 1 Xour OR Exceeding 5,000 and
DATE Start Time I End Time End Date Planned
VOLUME (mct) DESCRIPTION OF INCIDENT AND CAUSE CTION TAKEN TO ELIMINATE CAUSE
TOTAL
I
p
GRAND TOTAL
549
May 2013 production allocanon.xlsx, AOGCC Flaring report
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSMON
1. Facility Number 7'5
290000019
Name
Bi
3. Field
Badami
4. Operator
I Savant Alaska LLC
5. Monthfyear of Disposition
Jun -13
Disposition
Volume MCF
20. For pmduction from multiple pools, list contribution of each pool as a percent of Total
Volume,
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
33
Badami 60100 98.45%
Badami, Oil Undefined 60150 1.55%
8. Flared or vented 1 hour or less
35
100.00%
9. Flared or vented mom than i hour (see instr.)
735
10. Pilot and Purge
390
11. Assist Gas
12. Fuel gas used in lease operations.
21.290
13. Other (see instructions)
Official Use Only
Authorization >1 hr:
Safety
73S
MCF
10. TOTAL VOLUME (ITEMS 6.13)
22.483
Lease Use
MCF
15. NGL Gas Equivalent
Conservation
MCF
15. Purchased gas
4,532
Waste:
MCF
17. Transferred From:
/ . 3 _ /
CG
78. Transferred to: (Express as a negative #)
ommissio er Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the beat of my knowledge.
Note: All volumes must be Corrected to
Sgnaturer%./•J<//ice Tine Vice President pressure of 14.65 psia and to a
6 temperature of 60o F. Authority 20
AAC25.235.
Printed Name William J. Martinez 111 Phone 720.32(1 Date 7/19113
rurrn W-422
June 2013 production allocation.xisx AOGCC Facility Report
VI -r-
9 /)31)3
Unplanned Events Less Than or Equal To 1 Hour
DATE
Start Time End Time End Date Planned
VOLUME (mcf)
DESCRIPTION OF INCIDENT AND CAUSE. CTION TAKEN TO ELIMINATE CAUSE
Planned
TOTAL
35
Nat required r events Which are ess t an or
Not required for events which are less than or equal to 1 hour equal to 1 hour
Events Greater Than 1 Hour
DATE
Start7ime
Entl Time
End Date
Planned
VOLUME (mcf)
DESCRIPTION OF INCIDENT AND CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
770
The Lp flare was used to lower pressure on well B3-35 to assist in
6/2/13
10:12
11:18
6/2/13
Y
24
getting the pressure low enough to close the K valve for state well
This Is normal operations to bleed the pressure off
safety valve testing-
B3-15 during state well safety valve testing
6/6/13
2124
13:59
6/8/13
N
151
The VRU went down for a 2nd time on HH 2nd stage discharge
temperature and was left down for repairs In the morning
VRU safed out, depressured and readied for repairs
6/9/13
0:00
10:18
6/9/13
N
561
Repaired2nd stage discharge valves an the VRU
The VRU went down for repairs on 2nd stage discharge valves
restarted and put back on-line
TOTAL
735
Planned Events Exceeding 1 Hour OR Exceeding 5,000 mcf
DATE Start Time I End TimeEnd Date Planned
VOLUME (m DESCRIPTION OF INCIDENT AND CAUSE CTION TAKEN TO ELIMINATE CAUSE
TOTAL
0
GRAND TOTAL
770
June 2013 production all"lon.dsr, AOGCC Flaring report
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS nuRpnSITinN
1. Facility Number 2. Facility Name
290000019 Bt
Disposition
3. Field
Badami
Volume MCF
4. Operator 5. Momh/Tear of Dispmftion
Savant Alaska LLC Jul -13
20. For production from multiple pools list contribution oreach pool as a percent or Total
Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
27
Badami 60100 97.67%
Badami, Oil Undefined 60150 2.33%
8. Flared or vented 1 hour or less
153
100.00%
9. Flared or vented more than 1 hour (see insir.)
62
10. Pilot and Purge
403
11. Assist Gas
12. Fuel gas used in lease operations.
25,102
13. Other (see instructions)
Official Use Only
Authorization>I hr:
Safety
62
MCF
14. TOTAL VOLUME (ITEMS 6.13)
25,746
Lease Use
MCF
15. NGL Gas Equivalent
Conservation
MCF
16. Purchased gas
2.730
Waste:
MCF
17. Transferred from:
Commissioner (P Date
18. Transferred to. (Express as a negative #)
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
gg Note: All volumes must corrected to
psis ia and to a
SignalurTitle Vice President pressure of of
((!! temperature of 60o F. Authority 20
Printed Name William J. Martinez III Phone 720-328-7782 Date 8/79/13 AAC25.235.
V A A11
Orn1 l l l v-YLL
July 2013 production allocatlon.xlsx AOGCC Facility Report
VL -P?
q/1311.3
Unplanned Events Less Than or Equal To 1 Hour
DATE
Start Time
End Time I End Date I
Planned
I VOLUME (mcf)
DESCRIPTION OF INCIDENT AND CAUSE CTION TAKEN TO ELIMINATE CAUSE
TOTAL
153
Not required forevents which are esst anor
Not required for events which are less than or equal to 1 hour 1equal to t hour
Events Greater Than 1 Hour
DATE StartTimel End Time End Date Planned VOLUME (mcf) DESCRIPTION OF INCIDENT AND CAUSE MON TAKEN TO ELIMINATE CAUSL-
7/23/13 712 10:00 7/23/01 P 62 Small LP Flare associated with the VRU being shut down for repairs. Make the repairs and put the VRU back online.
TOTAL 62
Planned Events Exceeding 1 Hour OR Exceeding 5,000 mcf
DATE Start Time End Time End Date Planned VOLUME (mcf) DESCRIPTION OF IN AND CAUSE ACTION TAKEN TOELIMTNATE CAUSE
TOTAL p
GRAND TOTAL 1 215
July 2023 production allowtion.xlsx, AOGCC Flaring report
STATE OF ALASKA
ALASKA OILAND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
290000019
2. Facility Name
B1
3. Field
Badami
4. Operator
Savant Alaska LLC
S. MonthNear of ug -13 position
Aug -13
Disposition
Volume MCF
20. For production tom multiple pools, fist contribution of each pool as a percent of Total
Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
718
Badami 60100 95.86%
Badami, Oil Undefined 60150 4.14%
8. Flared or vented 1 hour or less
60
100.00%
9. Flared or vented more than 1 hour (see instr.)
815
10. Pilot and Purge
403
11, Assist Gas
12. Fuel gas used in lease operations.
13,162
13. Other (see instructions)
Oficial Use Only
Authorization 11 hr.
Safety
��
MCF
14. TOTAL VOLUME (ITEMS 6-13)
15,158
Lease Use
MCF
15. NGL Gas Equivalent
Conservation
MCF
16. Purchased gas
6,595
Neste:
MCF
17. Transferred from:
7 -/D -i
18. Transferred to: (Express as a negative p)
Commissioner Data
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
�� �J �--i—� Note: Alt volumes must corrected to
Signature 1 l�� Title vice President pressure of 14.65 sisia and to a
temperature of 60o F. Authority 20
Printed Name William J. Martinez III Phone 720-328-7182 Date 8/20/13 AAC25.235.
d1L1111PQa44
August 2013 production allocation.zlsz AOGCC Facility Report
VL F
131 J4 -
I Hour
TOTAL 60 lNot required for events which are less than or equal to 1 hour 1equai to 1 hour
are
Events Greater Than 1 Hour
DATE I Start Time I End Time I End Date I Planned
VOLUME (mcf) DESCRIPTION OF INCIDENT AND CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL
0
DATE
Start Time
End Time
End Date
Planned/
Unplanned
VOLUME (mcf)
DESCRIPTION OF INCIDENT AND CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
8/11/13
9:54
23:59
8/11/13
P
66
Plant BESD and tum around work
The plant will be re -started afterturn around.
8/11/13
6:48
8:18
8/11/13
P
98
Plant BESD and turn around work.
The plant will be re -started after turn around.
8/12/13
19:36
23:24
8/12/13
U
71
We had problems keeping our vapor recovery compressor running.
Worked on getting the compressor running.
8/12/13
0:00
16:42
8/12/13
P
164
The plant was shut down for turn around.
We completed the work and re -started the plant.
8/26/13
4:24
19:30
8/26/13
P
387
LP flare when the VRU was down for repairs-
Repair cooler leaks and re -start VRU.
8/31/13
5:30
17:54
8/TA
U
29
Small, LP flare volume coming from the IG compressors packing case This is normal operations for the compressors to
vents. vent gas into the packing case.
TOTAL
815
Planned Events Exceeding 1 Hour OR Exceeding 5,000 mcf
DATE I Start Time I End Time I End Date I Planned
VOLUME (mcf) DESCRIPTION OF INCIDENT AND CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL
0
GRAND TOTAL
875
August 2013 production allocxtion.xlsx, AOGCC Flaring report
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
290000019
2. Facility Name
131
3. Field
Badami
4. Operator
I Savant Alaska LLC
5. Monthfyear of Disposition
Sep -13
Disposition
Volume MCF
20. For production 6om multiple pools, list contribution of each pool as a percent of Total
Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
3
Bedami 60100 97.93%
Badami, Oil Undefined 60150 2.07%
8. Flared or vented lhour or less
147
100.00
9. Flared or vented more than 1 hour (see instr.)
765
10. Pilot and Purge
390
11. Assist Gas
12. Fuel gas used in lease operations.
41,639
13. Other (see instructions)
Official Use Only
Authorization >7 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.13)
42.945
Lease Use
MCF
15. NGL Gas Equivalent
Conservation
MCF
16. Purchased gas
567
MCF
17. Transferred from:
l —7-16 -14
�/,•�
18. Transferred to: (Express as a negative #)
Commissioner Date
19. Remarks:
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected to
Signature �' j�/�Gl Title Vice President pressure of 14.65 Asia and to a
c- temperature of 60o F. Authority 20
AAC25.235.
Printed Name William J. Martinez III Phone 720-328-7182 Date 10/17/2013
Form 10-422
September 2013 production allocation AOGCC Facility Report
VL, F
6/3/ l4
Events Less Than or Equal To 1
Date
TOTAL 147 (Not required for events which are less than or equal to 1 hour 1equal to 1 hour
or
Events Greater Than i Hour
DATE Start Time End Time End Date Planned
VOLUME (mcf) DESCRIPTION OF INCIDENT AND CAUSE
CTI TAKEN TO ELIMINATE CAUSE
TOTAL
Planned/
Not required for planned events which are less
than ar equal to 1 hour
DATE
Start Time
End Time
End Date
Unplanned
VOLUME (mcf)
DESCRIPTION OF INCIDENT AND CAUSE
ALCTION TAKEN TO ELIMINATE CAUSE
9/10/2013
21:18
23:59
9/10/2013
U
8
Fourth stage suction scrubber auto valve leaking on IG -13.
Closed the manual valve.
9/10/2013
10:00
12:12
9/10/2013
U
6
Fourth stage suction scrubber auto valve leaking on IG -B.
Closed the manual valve.
9/11/2013
22:42
23:59
9/11/2013
U
Wall, are voume coming from a compressors pac mgcase
is is norma opera to or ecompressors To
2
vents
gas Into the packing case.
9/11/2013
17:12
19:30
9/11/2013
U
5
ma, are voume coming from a compressors pac mgcase
is is norma operation or o
ecompressors ven
vents
gas into the packing case.
9/11/2013
14:42
17:06
9/11/2013
U
6
ma , are volume coming ram a compressors packing case
Is is norma operation or a compressors oven
vents.
gas Into the packing case.
9{11/2013
0:00
14:12
9/11/2013
U
46
Small, are volume coming from a compressors packing case
Is is norma operation or a compressors oven
vents.
gas into the packing case.
9/14/2013
8:00
20:48
9/14/2013
P
426
We shut the VRU down for maintenance work.
This is normal when we shut the Vi down.
9/15/2013
8:12
23:59
9/15/2013
U
51
small, LF flare volume coming tram the lu compressors pac mg case
I In Is is norma m
opera n for a ressors o compven
vents.
gas into the packing case.
9/16/2013
0:00
23:59
9/16/2013
U
77
ma , are volume coming from a compressors pac mg case
Is Is norma operation or a compressors oven
vents.
gas into the packing case.
9/17/2013
0:00
23:59
9/17/2013
U
75
�mall, Up flare volume coming from the compressors packing case
I his Is normal operation for the compressors o ven
Venn
gas into the packing case.
9/18/2013
15:24
18:12
9/18/2013
U
Small, are volume coming from a compressors Packing case
Is Is norma operation or a compressors o ven
7
vents.
gas into the packing case.
9/18/2013
0:00
9:18
9/18/2013
U
27
�mall, LP flare volume coming from the a compressors packing case
I his is normal operation for the compressors to vent
vents
gas into the packing case.
9/25/2013
2:42
6:24
9/25/2013
U
8
a , are volume coming from a compressors packing case
mvents.
is Is norma operation or a compressors o vent
gas into the packing case.
9/25/2013
0:00
1:30
9/25/2013
U
2
Small, LP flare volume coming from the lb compressors pac Ing case
i his Is normal operation for a compressors oven
vents.
gas into the packing case.
9/30/2013
18:18
23:59
9/30/2013
U
19
Small, LP here volume coming from thelb compressors packing case
I ms Is normal operation Yor me compressors oven
vents.
gas into the packing case.
TOTAL
765
Planned Events Less Than or Equal To 1 Hour AND Not Exceeding 5,000 mcf
DATE Start Time End Time End Date Planned
VOLUME (mcf) DESCRIPTION OF INCIDENT AND CAUSE
CTI TAKEN TO ELIMINATE CAUSE
TOTAL
Not required for planned events which are less than or equal
to 1 hour
Not required for planned events which are less
than ar equal to 1 hour
Planned Events Exceeding 1 Hour OR Exceeding 5,000 mcf
DATE StartTime End Time End Date Planned VOLUME (mcf) DESCRIPTION OF INCIDENT AND CAUSE CTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
GRAND TOTAL 912
September 2013 production allocation, AOGCC Flaring report
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRnnl irr:n rrec nieonerr,nki
1.
----
Facility Number 2. Facility Name 3.
-- --- _.. vr-w . Iwl VVI 1 IVt\
Field
290000019 Bi
4. Operator 5. Month/Year of Disposition
Disposition
Badami
Savant Alaska LLC Oct -13
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of Total
6.
Sold
Volume.
0
Pool Name Pool Gode Percent
7.
Reinjected
102
Badami 60109 9834%
Badami, Oil Undefined 60150 1.66%
B.
Flared or vented 1 hour or less
Y48
100.00%
9.
Flared or vented more than 1 hour (see instr.)
1,505
10.
Pilot and Purge
403
11.
Assist Gas
12.
Fuel gas used In lease operations.
35.077
13.
Other (see instructions)
official Use Only
14,
TOTAL
Authorization>1 hr. ,SO MCF
Safety
VOLUME (ITEMS & 13)
37,335
15.
NGL Gas Equivalent
Lease Use MCF
16.
Purchased gas
Conservation MCF
2,990
Waste: MCF
17.
Transferred from:
18,
Transferred to: (Express as a negative #)
Commissioner Date
19.
Remarks:
I hereby certify that the foregoing Is true and correct to the best knowledge.
of my
Note: All volumes must be corrected to
Signature `L
Title Vice President
pressure of 94.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Wllllam J. Martinez IIIAAC25.235.
Phona 720.328-7162
Date 11I20Y2013
Form
10-499
October 2013 production allocation AOGCC Facility Report
V1�
To 1
DATE I Start Time I End Time I End Date I Unplanned I VOLUME (mcf) I DESCRIPTION OF INCIDENT AND CAUSE I ACTION TAKEN TO ELIMINATE CAUSF
vc iegmreo Tor events which are
TOTgI 248 Not required for events which are less than or equal to 1 hour equal to 1 hour
Events Greater Than 2 Hour
Planned/
DATE
Start Time
End Time
End Date
Unplanned
VOLUME(mcF)
DESCRIPTION OF INCIDENT AND CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
10/1/2013
11:18
22:30
10/1/2013
U
26
ma are vo ume coming from ne compressors pac ing case
s is normal operation for e compressor o "=n
vent.
gas into the packing use.
10/1/2013
9:30
10:42
10/1/2033
U
1
ma are volume coming from a compressors pac ng case
is u norma opera nor a compressor o vent
vent'
gas Into the packing use.
10/1/2013
0:00
8:00
10/1/2013
U
23
he gas compressor s u own ue o a pressure on ewe ea
For well B145.
Everything was reset and brought back online.
10/2/2013
12:36
23:59
10/2/2013
Ub
34
mail LP flare vol ume coning I rom Tre compressrns pac nguse
I his isnorma operation mr memmpressor toven
10(2/2013
3:42
11:42
10/2/2013
U
vent.
gas Into the packing case.
197
The Turbine A shut down due to a HH vibration.
Restarted plant on Turbine B.
10/2/2013
2:30
3:36
10/2/2013
U
0
ma are volumecoming rom a chmpressorS pac ing case
is is norma ope t or ecompressor oven
vent.
gas into the packing case.
10/3/2013
15:18
17:06
10/3/2013
U
5
ma are volume wining romthe l compressorspac Inguse
is is norma operation rt a compressor to vent
vent'
gas Into the packing case.
10/3/2013
13:06
15:12
10/3/2013
U
5
Small L are volume coming rite compressors packing case
Tis is norma operMion r the compressorto vent
10/3/2013
0:00
11:06
10/3/2013
U
37
vent.
gas into the packing case.
vent
gas into the packing case.
10/6/2013
21:48
23:59
10/6/2013
U
6
ma are voume coming romthe compressors packing use
Tis is norma operation rt ecompressortovent
vent.
gas Into the packing case.
10/7/2013
2:30
6:30
10/7/2013
U
10
ma P are vo ume coming rami the compressors packing case
Isu norma operation ort the compressor to vent
vent.
gas into the packing use.
10/10/2013
4:54
6:54
10/10/2013
U
3
ma L flare voumewming romt a M compressors Packing czise
I his is normal operation Tort emmpressor to vent
10/10/2013
0:18
1:30
10/10/2013
U
vent.
gas Into the packing case.
1
vent.
gas Into the packing rase.
10/13/2013
14:12
17:Op
10/13/2013
P
66
is rs norma practice to depressure pipeillne or
Depressure utility Pipeline for maintenanm.
maintenance.
10/15/2013
15:00
17:06
10/15/2013
U
3
ma are volume coming fro me IQ compressors pac Ing case
is is normal operation fort the compressor to vent
vent.
gas Into the packing use.
10/18/2013
15:36
17:12
10/18/2013
U
1
ma are volume mining fromthe IG compressorspac Ingcase
This is normal operation fort ecompressor to vent
vent.
gas Into the packing case.
10/19/2013
19:12
23:18
10/19/2013
U11
'Small
LP flare volume coming int aIG compressors packing case
This is normal operation fort n compressor ovevent.
gas Into the packing case.
10/20/2013
21:06
23:59
10/20)2013
U
5
ma I LP liare vol ume coming rom t e compressors pa< ing case
This is normal operation ort a compressorto vent
vent'
gas into the packing use.
10/21/2013
0:00
23:59
10/21/2013
U
91
Brings ewe ins werand7e careful to not over
Flared off of the second stage separator bringing in 81-14.
pressure the second stage separator.
10/22/2013
0:00
23:59
10/22/2013
U
92
Bring the well ins ower and ge uleful to not over
Flared off of thecond stage separator bringing In 81-14,
so
pressure the second stage separator.
10/23/2013
0:00
23:59
10/23/2013
U
92
911111111 LP flare ve ume comng from the, I G compressors pac ng case
is is norma operation ort a compressor to vent
Ivent.
gas into the packing case.
October 2013 production allocation, AOGCC Flaring report
10/24/2013
0:00
23:59
10/24/2013
U
91
Small LP flare
volume
coming from
the
I G compressors packing
case
This is norma operation fort the
compressor to
vent
vent.
gas into the packing case.
10/25/2013
0:00
23:59
10/25/2013
U
97
Small LP flare
volume
coming
romthe
Icompressors pac
ing
case
This is normal operation fort the
compressor to
vent
vent.
gas Into the packing case.
10/26/2013
0:00
23:59
10/26/2013
U
95
Small LP flare
volume
coming
from the
IS compressors packing
case
Tis is normal operation for the
compressor to
vent
vent.
gas into the packing case.
10/27/2013
0:00
23:59
10/27/2013
U
94
SmallP
are volume
coming
from the
compressors pac
ing
case
is is norma operation ort
a compressor to
vent
vent.
gas into the packing case.
10/28/2013
0:00
23:59
10/28/2013
U
93
�mall LP flare
volume
coming
from the
IG compressors packing
case
This is normal operation fort the
compressor to
vent
vent.
gas into the packing case.
10/29/2013
0:00
23:59
10/29/2013
U
89
Small P flare
volume
coming
from the
IG compressors packing
case
This is norma operation or
Me—compressor to
vent
vent
gas Into [he packing case.
10/30/2013
0:00
23:59
10/30/2013
U
92
ma
are vo
ume
coming
rom t
e I compressors packing
ng
case
is is norma operation ort
a compressor to
vent
vent.
gas into the packing case.
10/31/2013
20:12
0:00
10/31/2013
U
11
Small LP flare
volume
coming
fromthe
IG compressors pac
mg case
This is normal operation fort the
compressor to
vent
vent.
gas Into the packing case.
10/31/2013
0:00
17:06
10/31/2013
U
129
Lost IG -B
compressor
on a HH
first stage discharge pressure
because
gas froze in the coolers due to
a quick drop In temperature.
JCIosed louvers to keep gas from freezing.
TOTAL
1,505
GRAND TOTAL 1,753
October 2013 production allocation, AOGCC Flaring report
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PROnimm rnS n1cPnc1T1n1U
1. Facility Number 2. Facility Name
290000079 B1
Disposition
-- ---------
3. Field
Badami
Volume MCF
----- . VV...V..
4. Operator 5. MonthlYear of Disposition
Savant Alaska LLC Nov -13
20. For production from multiple pools, list contribution of each pool as a percent of Total
Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
Badami 60700 98.97%
Badami, Oil Undefined 60150 1.03%
8. Flared or vented 1 hour or less
23
100.00%
9. Flared or vented more than 1 hour (see instr.)
1,643
10. Pilot and Purge
390
11. Assist Gas
12. Fuel gas used in lease operations.
44,761
13. Other (see instructions)
Official Use Only
Authorization >1 hr-
Safety
��
MCF
14.
74. TOTAL VOLUME (ITEMS 6-13)
46,817
Lease Use
MCF
15. NGL Gas Equivalent
Conservation
MCF
16. Purchased gas
530
waste:
MCF
17. Transferred from:
Commissioner Date
18. Transferred Transferred to: (Express as a negative #)
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
%��` Note: All volumes must corrected to
Signature _�/ ✓�,� Title Vice President pressure of 14.65 psisla and to a
temperature of 60o F. Authority 20
Printed Name William J. Martinez III Phone 720-328-7782 Date 12116/2013 AAC25.235.
Rn.m 10 A00
November 2013 production allocation AOGCC Facility Report
VLF
�-4114,-
Events Less Than or Equal To 1 Hour
anne
LU E
DATE
Start Time
End Time
End Date
Unplanned
(mcf)
CRIPTION OF INCIDENT AND CA
ACTION TAKEN TO ELIMINATE CAUSE
11/1(13
Not require or le—ve—n—ts-w—T is are less
Not required for events which are less t an or
TOTAL 23
than or equal to 1 hour
equal to I hour
Events Greater Than 1 Hour
Planned/
VOLUME
DATE
StartTime
End Time
End Date
Unplanned
(mcf)
CRIPTION OF INCIDENT AND CA
ACTION TAKEN TO ELIMINATE CAUSE
11/1(13
19:12
23:59
11/1/13
U
22
v
v
compressors packing case vents.
gas into the packing cases.
11/1/13
14:42
16:00
11/1/13
U
3
Small LF Tiarev u
op e vent
compressors packing case vents.
gas into the packing cases,
11/1/13
12:18
14:06
11/1/13
U
5
ma are volume c0m1ng rom e
i is norma operation or e compressors vent
compressors packing case vents.
gas into the packing cases.
i1J1/13
0:00
11:54
11/1/13
U
39
v umL coming
I n ormal v n
compressors packing case vents.
gas into the packing cases.
11/2/13
3:00
23:59
11/2/13
U
140
volumeTore
compressors to vent
compressors packing case vents.
gas into the packing cases.
Had a PLC Issue in M-400, which caused the
In the future, when we make our rounds, we will be
plant to BESD. The PLC somehow got turned
sure to check the switches on all the PLC stations each
11/2/13
0:00
2:S4
11/2/13
U
107
off and we were running on hack -up
time we go into the Mods.
batteries when they ran out of charge, it
then showed a fire alarm and BESD the
plant.
11/3/13
0:00
23:59
11/3/13
U
124
volumeSmall LF flare
o s v
-97-
compressors packing case vents.
gas into the packing cases.
11/4/13
0:00
23:59
11/4/13
U
110
volumeSMNII IF flare
compressors packingcase vents.
gas into the packing cases.
11/5/13
0:00
23:59
11/5/13
U
103
ma are volume coming from e
is is norma operation or e compressors o ven
compressors packing case vents.
gas into the packing case.
11/6/13
11:18
23:59
11/6/13
U
53
volume-coiningSmall, LF Tare
compressors packing case vents.
gas into the packing cases.
11/6/13
0:00
11:12
11/6/13
U
52
volume
compressors1:37477r
compressors packing case vents.
gas into the packing cases,
11/7/13
0:00
23:59
11/7/13
U
49
v
TO[tneconnpressor�v
compressors packing case vents.
gas into the packing cases.
11/8/13
2:50
9:54
11/8/13
U
12
compressors packing case vents.
gas into the packing cases.
November 2013 production allocation.xlsx, AOGCC Flaring report
11/8/13
0:00
2:42
11/8/13
U
4
volurnevent
compressors
packing case
vents,
gas into the
packing cases.
11/9/13
6:06
23:59
11/9/13
U
35
volume=719=77=
I asnormal
compressors
packing case
vents.
gas into the
packing cases.
11/10/13
0:00
23:59
11/10/13
U
42
ma , are vo ume come g rom e
is is norma operation or
e compressors
o v en
compressors
packing case
vents.
gas into the
packing cases.
11/11/13
3:30
15:12
11/11/13
U
18
v uoperationo
v
compressors
packing case
vents.
gas into the
packing cases.
11/11/13
0:00
3:24
11/11/13
U
4
snIall, LF flare
volume
compressorsvent
compressors
packing case
vents.
gas into the
packing cases.
11/12/13
22:30
23:59
11/12/13
U
2
�Mall, Ll' Tare
volume =717773M==
I tits is normal
operation Tor
compressors
packing case
vents.
gas into the
packing cases.
11/13/13
0:00
23:59
11/13/13
U
47
�roall, LF flare
volume
i
v
compressors
packing case
vents.
gas into the
packing cases.
11/14/13
0:00
23:59
11/14/13
U
45
Small, are volume cQnTI797F3—M—fre=
I Mis is normal operation Tor
me compressors
o venr-
compressors
packing case
vents.
gas into the
packing cases.
11/15/13
0:00
23:59
11/15/13
U
41
v u
vent
compressors
packing case
vents.
gas into the
packing cases.
11/16/13
0:00
23:59
11/16/13
U
40
volume
i
y
compressors
packing case
vents.
gas into the
packing cases.
11/17/13
17:18
23:59
11/17/13
U
10
volume
vent
compressors
packing case
vents.
into the packing cases.
11/17/13
0:00
17:12
11/17/13
U
30
7MTrr77M79—vM=mmg
from Me IG
Inis is normal
operation Tor z7773TRrM97`7r37rrIT-
compressors
packing case
vents.
into the packing cases.
11/18/13
18:48
22:18
11/18/13
U
6
volume
u...is
is normal
operation Tor
Me compressors
to ve
compressors
packing case
vents.
gas into the
packing cases.
11/18/13
0:00
1:18
11/18/13
U
2
volume
vent
compressors
packing case
vents.
gas into the
packing cases.
11/19/13
0:00
23:59
11/19/13
U
77
volume
e compressors
73 v
compressors
packing case
vents.
gas into the
packing cases.
11/20/13
0:00
23:00
11/20/13
U
44
ma ,
e vo ume coming from tne G
I nis is normal operation Tor
Me compressor
vent
compressors
packing case
vents.
gas into the
packing cases.
11/21/13
13:24
23:59
11/21/13
U
20
5mall, LF rare
u
compressorsv
compressors
packing case
vents.
gas into the
packing cases.
11/21/13
9:24
11:48
11/21/13
U
4
VOIURrse conningis
normal
operationvent
compressors
packing case
vents.
gas into the
packing cases.
11/21/13
6:24
7:36
11/21/13
U
2
bri LV flare
volume
vem-
compressors
packing case
vents.
gas into the
packing cases.
11/21/13
2:06
3:30
11/21/13
U
2
�rfldll,LFTiarevoiumecun)ingtron)tfleib
MIS 15 normal
operation lor
Me compressors
v n
compressors
packing case
vents.
gas into the
packing cases.
11/22/13
0:00
23:59
11/22/13
U
50
volulne coming
from tne l=
I asi
compressors
packing case
vents.
gas into the
packing cases.
November 2013 production allocation.xlsx, AOGCC Flaring report
11/23/13
0:30
23:59
11/23/13
U
40
LFTIarevc1uM=iWRTrom one M
i nsvent
compressors packing case vents.
gas into the packing cases.
11/24/13
0:00
13:12
11/24/13
U
22
Z,Mall, LF flare volume coming from tne To
I nis is normal operation For Me compressors to y
compressors packing case vents.
gas into the packing cases.
11/25/13
12:54
23:59
11/25/13
U
Small, LV Tlare volume coming TrOM the lb I
I nis is normal operation Tor Ine compressors o ven
16
compressors packing case vents.
gas into the packing cases.
11/26/13
9:30
21:30
11/26/13
U
19
Small, LH flare volume
veMT-
compressors packing case vents.
gas into the packing cases.
11/26/13
7:54
9:24
11/26/13
U
1
�Frall, LJ` flare volume coming room Me IG
inis is normal operation Tor trie compressors to vent
compressors packing case vents,
gas into the packing cases.
11/26/13
6:30
7:48
11/26/13
U
1
Milan,, LF Trarc volume
n lot Erie compressors to venT-
compressors packing case vents,
gas into the packing cases.
11(26/13
0:00
6:24
11/26/13
U
9
�Mall, LP flare volume cz;ming Trom tne lb
I Mrs is normal operation Tor Me compressors to vent
compressors packing case vents.
gas into the packing cases.
11/27/13
21:30
23:59
11/27/13
U
3
�Mall, LF flare vo ume coming trom the G
I his Is normal operation Tor Me comprMs7r7to ven
compressors packing case vents.
gas into the packing cases.
11/27/13
17:48
21:24
11/27/13
U
4
Small, LF flare volume
vent -
compressors packing case vents.
gas into the packing cases.
11/27/13
7:18
9:24
11/27/13
p
36
VHU down tor lubeoil Iterc ange.
Pertorm PM and put back ovine.
11/28/13
0:00
23:59
11/28/13
U
50
volume
venT-
compressors packing case vents.
gas into the packing cases.
11/29/13
0:00
23:59
11/29/13
U
50
ma are vo ume coming trom the lb
I his Is normal operation tar Me compressors to ven
compressors packing case vents.
gas into the packing cases.
11/30/13
0:00
23:59
11/30/13
U
45
volume
I is normal operation Tor Me compressors Tv
compressors packing case vents.
gas into the packing cases.
TOTAL 1'04�
November 2013 production allocation.xlsx, AOGCC Flaring report
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED Gas nispns1T1nN
1. Facility Number
290000019
2. Facility Name
B1
3. Field
Badami
4. Operator
I Savant Alaska LLC
5. Month/Year of Disposition
Dec -13
Disposition
Volume MCF
20. For production from multiple pools, Ilst contribution of each pool as a percent of Total
Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
Badami 60100 97.55%
Badami, Oil Undefined 80150 2.45%
8. Flared or vented 1 hour or less
90
100.00%
9. Flared or vented more than 1 hour (see instr.)
2,118
10. Pilot and Purge
403
11. Assist Gas
12. Fuel gas used in lease operations.
52,836
13. Other (see instmc8ons)
Official Use Only
Authorization >1 hr.
Safety
1 /l
l�
MCF
14. TOTAL VOLUME (ITEMS 6-13)
55,447
Lease Use
MCF
15. NGL Gas Equivalent
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
/ 7
18. Transferred to: (Express as a negative #)
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
�� ,J % Title Vice President Note: All volumes must be corrected to
Signature r s pressure of 14.65 psia and to a
`— temperature of 600 F. Authority 20
Printed Name William J. Martinez III Phone 720-328-7182 Dale 1/1612014 AAC25.235.
V-- in non
December 2013 production allocation AOGOZ Facility Report
vLP
6/3/15L
Events Less Than or Equal To 1 Hour
Planned/
DATE
StartTime
End Tlme
End Date
Unplanned
VOLUME (mcf)
DESCRIPTION OF INCIDENT AND CAUSE
CTION TAKEN TO ELIMINATE CAUSE
12/1(2013
0:00
Not required for events which are less than or
TOTAL 90
Not required for events which are less than or equal to 1 hour
equal to 1 hour
Events Greater Than 1 Hour
Planned/
DATE
StartTime
End Time
End Dat=
Unplanned
VOLUME (mcf)
DESCRIPTION OF INCIDENT AND CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
12/1(2013
0:00
23:59
12/1/2013
U
62
rs s norma operations r me compressors o
Small, LP flare coming from the IG compressors packing case vents.
vent gas Into the packing cases.
122/2013
0:00
23:59
12/22013
U
80
rs is norma operations or ecompressorso
Small, LP flare coming from the lG compressors packing case vents.
vent gas into the packing cases.
12/2/2013
10:30
12:12
12/2/2013
U
1
Sman he nare causea from , ci,11118 111,51 of the
bringpan ac upon Qi I -b an ou emo0
facility
issues with GT -A.
/2/2013
30:30
12:12
12/2/2013
U
50
Small are Taus from -- , causing a o e
nngpan ac upon- an oues o0 r
facility
issues with GT -A.
12/3/2013
10:36
23:59
12/3/2013
U
23
rs u norma o
operations or Me
Small, LP flare comingfrom me IG compressors packing Gaze vents.
p p g
vent gas into the packing roses.
12/3/2013
0:00
2:34
12/3/2013
U
4
This is normal operations for the compressors to
Small, LP flare coming from the IG compressors packing case vents,
vent as into [he ackin cases.
12/4/2013
0:00
23:59
12/4/2013
U
48
Is snorma operabpns rt ecompressors to
Small, LP flare coming from the lG compressors packing case vents.
vent gas into the packing cases.
12/5/2013
0:00
23:59
12/5/2013
U
42
is is norma operations ort ecompressors to
Small, LP flare comi ng from the IG compressors packing case vents.
vent gas into the packing cases.
12/6/2013
0:00
23:59
12/6/2013
U
48
Small, LP flare comi ng from the lG compressors packing case vents.
vent gas into the packing cases.
12/7/2013
19:48
23:59
12/7/2013
Ug
is is norma operations or the compressors to
Small, LP flare coming from the IG compressors packing case vents.
vent: a5imo the packing cases.
12/7/2013
0:00
19:12
12/7/2013
U
T norma operations orthe compressors to
Small, LP flare coming from the IG compressors packing ase vents.
vent gas into the packing ca ses.
12/8/2013
0:00
23:59
12/8/2013
U
45
This is norma operations orthe compressors to
Small, LP flare coming from the IG compressors packing case vents.
vent gas into the packing cases.
12/9/2013
21:42
22:48
12/9/2013
U
0
Small, LP flare coming from the lG compressors packing case vents.
vent gas into the packing cases.
12/9(2013
18:00
20:54
12/9/2013
U
3
This is norma operations ort the compressors to
Small, LP flare coming from the IG compressors packing case vents.
vent gas into the packing cases.
12/9(2013
16:18
1]:54
12/9/2013
U
1
This is norma operations orthe compressors to
Small, LP flare coming from the IG compressors packing case vents.
vent gas into the packi ng cases.
12/9/2013
0:00
]:54
12/9/2013
U
4
Is is norma operations orthe compressors to
Small, LP flare coming from the IG compressors packing case vents.
vent gas into the packing cases.
12/10/2013
18:54
22:Ofi
12/10/2013
U
3
This Is normal operations ort the"pressors to
Small, LP flare corrin from the IG compressors packing case vents.
Corning P p g
vent gas into the packing aces.
12/11/20]3
16:18
23:59
12/11/2013
U
30
This is norma operations r t compressors to e
Small, LP flare coming from the IG compressors packing case vents.
vent gas into the packing a an.
12/11/2013
3AB
14:30
12/11/2013
U
SS
This is norma operations rt the compressors to
Small, LP flare coming from the IG compressors packing case vents.
vent gas into the packing cases.
12/12/2013
0:00
23:59
12/12/2013
U
89
is is normal operations -;;r tecompressors to
Small, LP flare coming from the lG compressors packing ase veni
vent gas into the packing cases.
12/13/2013
0:00
23:59
12/13/2013
V106
Tis is norma operations the compressors to
Small, LP flare coming from the IG compressors packing case vents.
vent gas into the packing cases.
12142013
0:00
23:59
12/14/2013
U
101
is is normal operations orthe com pressors to
Small, LP flare coming from the IG compressors packing ase vents,
vent gas into the packing cases.
12/15/2013
OAO
23:59
12/15/2013
U
115
T 1s is normal operations ort ecompre55ar5 t0
Small, LPflare coming from the IG compressors packing case vents.
vent gas into the packing cases.
December 2013 Omdoe ion allootion, ADGCC Flaring report
12/16/2013
0:00
23:59
12/16/2013
U
112
This is normal operations for thecompressors to
Small, LP flare coming from the IG compressors packing case vents.
vent gas into the p acking cases.
12/17/2013
0:00
23:59
12/17/2013
U
97
is is normal operations Tortire compressors to
Small, LP flare Coming from the lG compressors packing case vents.
vent gas into the packing cases.
12/18/2013
0:00
23:59
12/18/2013U
55
This is normal operations forthe compressorsto
Small, LP flare coming from the IG compressors packing case vents.
vent gas into the packing cases.
12/19/2013
0:00
23:59
12/19/2013
U
63
rs is norma operations for the Compressors to
Small, LP flare mining from the IG Compressors packing case vents.
vent gas into the packing cases.
12/20/2013
21:06
23:59
12/20/2013
U
4
This is norma operahons orthe compressors to
Small, LP flare coming from the IG compressors packing case vents.
vent gas into the packing rases.
12/20/2013
6:36
18:00
12/20/2013
U
37
This is normal operations ort ecompressors to
Small, LP flare coming from the IG compressors packing case vents.
vent gas into the packing cases.
12/2080]3
0:00
2:12
12/20/2013
U
2
Tis is norma operations orthe Compressors to
Small, LP flare coming Rom the IG compressors packing case vents.
vent gas into the packing cases.
12/21/2013
0:00
23:59
12/21/2013
U
41
is n
is orma operahons or ecompressors to
Small, LP flare coming from the lG compressors packing use vents.
vent gas lino the packing cases.
12/22/2013
19:30
0:00
12/228013
U
g
rsisnorma operations ort ecompressors to
Small, LP flare Coming from the IG compressors packing use vents.
vent gas into the packing cases.
12/22/2013
17:12
18:12
12/22/2013
U
12
Tried starting our IG -e gas compressor, but it was leaking badly past
the packings. Ended up having to de -pressure it by venting to flare.
Maintenance is working to fix this problem.
12/22/2013
0:00
17:12
12/22/2013
U
36
is is normal operations torthe compressors to
Small, LP flare coming from the IG compressors packing case vents,
vent gas into the packing cases.
12/23/2013
8:24
23:59
12/23/2013
U
49
This is norma operations ort ecompressors to
Small, LP flare coming from the IG compressors packing case vents.
vent gas into the packing cases.
12/23/2013
0:00
7:42
12838013
U
16
This is norma operations for t eCompressors to
Small, LP flare coming from the IG compressors packing case vents.
vent gas into the packing uses.
12/24/2013
D:00
23:59
12/24/2013
U
126
is isnorma operations for thecon, presson to
Small, LP Flare coming from the IG compressors packing use vents.
vent gas Into the packing uses.
12858033
0:00
23:59
1285/2013
U
115
This is norma operations orthe Compressors to
Small, LP flare coming from the IG compressors packing case vents.
vent gas into the packing uses.
12/26/2013
0:00
23:59
12/26/2013
U
152
This is norma operations rthe compressors to
Small, LP flare coming from the IG compressors packing case vents.
vent gas into the packing uses.
12/27/2013
0:00
23:59
12/27/2013
U
75
This is normal operations for the compressors to
Small, LP flare Coming from the IG compressors packing case vents.
vent gas into the packing uses.
12/28/2013
9:54
11:00
12/28/2013
U
3
his is normal operations fort ecompressors to
Small, LP flare Coming from the IG Compressors packing case vents.
vent gas into the packing cases,
12/28/2013
0:00
9:48
12/28/2013
U
30
This is normal operations forthe compressors to
Small, LP flare coming from the IG compressors packing case vents.
vent gas into th a packing cases.
12/29/2013
1824
23:59
12/29/2(113
U
15
rs is norma operations rthe Compressors to
Small, LP flare coming from the IG Compressors packing use vents.
vent gas i nto the packing uses.
12/30/2013
14:54
23:59
1280/2013
U
29
is is normai operations for thecompressors to
Small, LP flare mining from the IG compressors packing use vents.
vent gas into the packing uses.
1280/2013
8:36
13:54
]2/30/2013
U
21
This is norma operations orthe Compressors to
Small, Els flare coming from the IG compressors packing case vents.
vent gas into the packing cases,
12/30/2013
0:00
6:42
12/30/2013
U
11
This is norma operations orthe compressors to
Small, LP fla re coming from the IG compressors packing use vents.
vent gas into the packing cases.
12/31/2013
0:00
23.59
12/31/2013
U
g4
Thi519 norma operahons orthe compressors to
Small, LP flare Coming from the IG Compressors packing use vents.
vent gas into the packing cases.
TOTAL 2,118
GOANDTOTAL 2,209
December 2013 production allocation. AOGCC Flaring report