STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
tvon: scar BP
Disposition g12,151,233
20. For production from multiple pools, list conull
1. Sold Total Volume.
Pool Name
Reinjected Northstar
Northstar
Flared or vented 1 hour or less
. Flared or vented more than 1hour (see instr.) 104,310
0. Pilot and Purge 0
1. Assist Gas
0
12. Fuel gas used in lease operations.
0
13. Other (see instructions)
0
Authorization -
14. TOTAL VOLUME (ITEMS 6.13)
12,255,543
15. NGL Gas Equivalent
16. Purchased gas
601,677
Waste:
17. Transferred from:
18. Transferred to: (Express as a negative #)
s. Remarks: Tlocks 6 - 14 include only produced gas from Northstar (includes tract operations NS08 and
was used as follows (all in mscf):
fuel gas 512,181, pilot purge 5456, injection 84,040.
Use
Commissioner
not gas
Date
Gas purchased from
,�%��Q Manager, Production Taxes and Royalties Note: All volumes must be
Signature 01 K a Title Alaska
`"`�CCCC I
corrected to pressure of 14.65 psia
led Name Diane Colley Ph—c.. _.
� and to a temperature of 60o F.
ronTcc„
Northstar Gas Flaring Incident Report
1/1/2013 - 1/31/2013
Start Date / Time End Date / Time Minutes
Planned Less Than 1 Hour
Group Total
MCF Incident Cause / Description
0
Planned Greater Than 1 Hour
Group Total 0
Unplanned Less Than 1 Hour
Group Total 0
Unplanned Greater Than 1 Hour
1/1/2013 0:00 1/31/2013 23:59 31 days 104,310 LP Compressor failure
Group Total 104,310
Report Total 104,310
NSTR FlarelncidentDetails 01-2013 FINAL.xls
Remediation Taken Event Type Flare
Process optimization to Equipment LP, HPI,
minimize flaring Outage HP2
2/11/2013 1:58 PM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PPrnni tlf%l=n r_nc
CHOPS
Flare Incident Details
1/1/2013 -1/31/2013
Start Date/Time
Entl DatsRime
Minutes
Flare MCF
Assist MCF
Incident/Cause Description Remediation
Unplanned Less than 1 Hour
Taken
14Jan-13 22:46
r --
14 -Jan -13 22:46
1
0.00
0.00
16 -Jan -13 3:42
16 -Jan -13 3:42
1
0.00
0.00
16 -Jan -13 3:43
16 -Jan -13 3:43
1
0.00
0.00
16 -Jan -13 6:25
i6Jan-13 6:26
1
0.01
0.00
16 -Jan -13 9:17
16 -Jan -13 9:18
1
0.02
0.00
16 -Jan -13 15:45
18-__� -Jan-13 10:54
4-
18 -Jan -13 11:12
16 -Jan -13 15:47
18 -Jan -13 1L0:57
lWan-13 11:14
2
3
2
0.02
0.23
0.07
0.00
0.00
0.00
18 -Jan -13 12:20
18 -Jan -13 12:20
1
0.01
0.00
18 -Jan -13 1228
j_18 -Jan -13 12:31
r18 -Jan -13 14:56
18 -Jan -13 12:31
18Jan-13 12:33
18 -Jan -13 14:57
3
2
1
0.05
0.04
0.02
0.00
0.00
0.00
18 -Jan -13 20:16
18 -Jan -13 20:16
1
0.01
0.00
18-JarF13 20:16
18 -Jan -13 20:19
1
0.01
0.00
23 -Jan -13 23:11
23 -Jan -13 23:12
1
0.01
0.00
-Jan-13 14:06
3i 1 -Jan -13 11:42
29 -Jan -13 14:11
31 -Jan -13 11;453
5
0.10
on3
0.00
nnn
Unplanned Less than 1 Hour Total:
Unplanned Greaterthan 1 Hour
24 -Jan -13 21:33 24 -Jan -13 23:43 130
Unplanned Greater than 1 Hour Total:
Total Flared Volume (MCF):
BP Exploration
_I 1
0.63 0.00 # of Events: 17
0.45 I 0.00
0.46 0.00 # of Events: 1
1.08 0.00 #of Events: 18
pc.11y JolKnlAy -��p hrv1�U - fgncr� .
Page 1 of 1
by
Start Date/Time I End Datarrime
Unplanned Less than 1 Hour
07 -Jan -13 9:56
07 -Jan -13 9:59
07 -Jan -13 10:13
07 -Jan -13 10:14
0.00
21
an -13 14:55
10 -Jan -13 14:56
an -13 15:00
F
10 -Jan -13 15:06
an -13 20:22
14 -Jan -13 20:43
14 -Jan -13 22:49
14 -Jan -13 23:41
15 -Jan -13 0:26
15 -Jan -13 0:27
i 15 -Jan -13 0:34
15 -Jan -13 0:36
I 5 -Jan -13 1:36
15 -Jan -13 1:41
1
0.33
15 -Jan -13 1:59
15 -Jan -13 2:00
15-1an-13 2:02
15 -Jan -13 2:04
15 -Jan -13 2:10
15 -Jan -13 2:11
15 -Jan -13 2:13
15 -Jan -13 2:14
0.30
0.00
15 -Jan -13 2:25
15 -Jan -13 2:26
-Jan -13 2:28
15 -Jan -13 2:29
�75
5-Jan-13 2:30
15 -Jan -13 2:32
15 -Jan -13 2:35
15 -Jan -13 2:37
15 -Jan -13 3:34
15 -Jan -13 3:38
!Y 15 -Jan -13 3:40
15 -Jan -13 3:42
115 -Jan -13 3:45
15 -Jan -13 3:46
15 -Jan -13 3:54
15 -Jan -13 3:58
15 -Jan -13 8:50
15 -Jan -13 9:00
1
0.32
15 -Jan -13 9:04
15 -Jan -13 9:11
15 -Jan -13 9:14
15 -Jan -13 9:16
15 -Jan -13 9:18
15 -Jan -13 9:31
15 -Jan -13 9:35
15 -Jan -13 9:43
15 -Jan -13 9:55
15Jan-13 9:58
15 -Jan -13 10:10
15 -Jan -13 10:13
15 -Jan -13 10:18
15 -Jan -13 1023
15 -Jan -13 10:25
15 -Jan -13 10:28
15 -Jan -13 10;31
15 -Jan -13 10:33
BP Exploration
Minutes I Flare MCF I Assist MCF
3
1
1
0.96
0.33
0.31
0.00
0.00
0.00
6
16.67
0.00
21
186.00
0.00
52
73.64
0.00
1
0.32
0.00
2
0.65
0.00
5
1.98
0.00
1
0.33
0.00
2
0.30
0.00
1
0.36
0.00
1
0.30
0.00
1
0.32
0.00
1
0.62
0.00
2
0.30
0.00
2
1.28
0.00
4
1.62
0.00
2
0.64
0.00
1
0.32
0.00
4
1.59
0.00
10
4.22
0.00
7
2.17
0.00
2
0.63
0.00
13
3.74
0.00
8
3.33
0.00
3
1.25
0.00
3
0.95
0.00
5
1.59
0.00
3
0.62
0.00
2
0.64
0.00
Milne Point Unit
Flare Incident Details
1/1/2013 -1/31/2013
IncidentfCause Description
Remediation Taken
Page 1 of 2
by
Milne Point Unit
Flare Incident Details
d
1/1/2013 -1/31/2013
Start Date/Time End Date/Time Minutes
15 -Jan -13 71:35 15 -Jan -13 71:42 7Remediation
15 -Jan -13 11:45 15 -Jan -13 12:19 34
15 -Jan -13 12:39 15 -Jan -13 12:50 11
15 -Jan -13 12:52 15 -Jan -13 12:52
15 -Jan -73 12:53 15Jan-13 12:57 q
�----
15 -Jan -13 13:01 15 -Jan -13 13:11 10
15 -Jan -13 13:13 15 -Jan -13 13:19 g
15 -Jan -13 13:25 15 -Jan -13 13:27 y
--
15 -Jan -13 14:59 15 -Jan -13 15:00 7
16 -Jan -13 6:40 16 -Jan -13 6:44 q
'---
20 -Jan -132005 20 -Jan -13 20:07 2
26-Jan_13 12:52 26 -Jan -13 72:54 2
Unplanned Less than 1 Hour .001:
Unplanned Greater than 7 Hour
Flare MCF
2.49
35.17
4.78
0.32
1.56
4.53
2.89
0.64
0.33
8.80
0.31
1.34
370.59
Assist MCF
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
IncldentlCause Description
# 43
of Events:
Taken
74 -Jan -13 2043 14 -Jan -13 22:47 124
i_
15 -Jan -13 4:21 15 -Jan -13 8:50 269
Unplanned Greater than l Hour Total:
341.48
295'07
636.55-_.
0.00
0.00
0.00
0701 Turbine shut down due to high pressure
differential on th inlet air filters during Phase 3 weather
conditions. This cascaded into a gas compression
shutdown.
While bdnging the plant back on line, a high high level
in the Oil Reserve Tank caused a full field shutdown,
# of Events: 2--.__._„_�
Maintenance was called and the purge on the gas
compressors and 1 train was started.
Maintenance was called and BPXA worked to bring the
field and plant back up and to stop the flaring as soon as
ossible.
Total Flared Volume (MCF):
1,007.13
0.00
# of Events:45
BP Exploration
Page 2 of 2
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Sold
--^ rw•�ww, .,ran mu4lpie p(g13, lut GOrIV
g
Total Volume
Reinjected
Pool Neme
10,237,889
Nonhstar
Flared «varied 1 hour or less
NOrthstar
99
Flared or ,ented mon, than 1 hour (see i ah )
91,205
. Pilot and PurW
0
Assist Gas
0
Fuel gas used in lease opaatbna
0
Other (see InstNClions)
--
O1hClal Use
TOTAL VOLUME (ITEMS 6-1J)
ANFptuation>1 hr:
Salary
10,329,173
NGL Gas Equivalent
Lease Use
Purchased gas
Conaerva6nn
551,350
Transferred from
Waste:
Translenvid to: (Express as a negative t) L Commissioner
Remarks Blocks 6 14 I ri m Date
-• ly r wuwd yas ,mom .,-,,,.star (includes trail operations NS08 and NS34A but not gas from PBU)- Gas purchased from
PBU was used as follows (all in maory: fuel gas 478,705, pilot Purge 4,928, injection 67,717,
ehy ceniHamt' �:n-1-11-11.1'.. rue antl--matt to the hest of Fry, knomedge
Signature, 61011 U �.r'`i.-�L .� Manager, Productlon Taxes and Royalties Note: All Volumes must be
y Two Alaska[ /1 corrected to
ted Name Diane Colla '-) [ •�jj �1* and to a temperature off SGO Pala
Ptgr,e (507)564.5776 -as. � Pe lure of 60o F.
Northstar Gas Flaring Incident Report
2/1/2013 - 2/28/2013
Start Date / Time
Planned
End Date / Time Minutes
MCF
Incident Cause / Description
Less Than 1 Hour
3
Group Total
3
Planned
Greater Than 1 Hour
2/26/20136:30
2/261201316:13
1,137
LP purge
2/26/2013 6:32
2/26/2013 16:30
1,602
N/A
LP purge
Group Total
2,739
N/A
Unplanned Less Than 1 Hour
96
Group Total 96
Unplanned Greater Than 1 Hour
2/1/2013 0:00 2/24/2013 23:59 24 days 88,466 LP Compressor failure
Group Total 88,466
Report Total 91,304
NSTR FlarelncidentDetails 02-2013 FINAL -As
Remediation Taken
Process optimization to
minimize flaring
Event Type Flare
Equipment LP, HN,
Outage HP2
3/11/2013 3:52 PM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
lcility Name ,._„
6
Sold
0
7.
Reinjected
16,417,094
8.
Flared or vented 1 hour or less
474
9.
Flared or vented more than 1 hour (see instr.)
0
10.
Pilot and Purge
0
it.
Assist Gas
0
12.
Fuel gEusedse operations.013.
Otherns)
0
14.
TOTAL VOLUME (ITEMS 6-13)
16,417,568
15.
NGL Gas Equivalent
Use
Total Volume,
16. Purchased gas Conservation
743,102
Waste:
17. Transferred from:
18. Transferred to: (Express as a negative #)
Commissioner
9. Remarks: Blocks 6 - 14 include only produced gas from Northstar (includes tract operations NS08 and N634A but not gas
PBU was used as follows (all in msco: fuel gas 671,090, pilot purge 5,456, injection 66,556.
Gas
as a
Date
=ter ,.�Irny mat the roregoing is true and correct to the best of my knowledge.
,� S Manager, Production Taxes and Royalties Signature � c!" wnn Y Note: All volumes must be
�( (// Tine Alaska
���� corrected to pressure of 14.65 psia
led Name Diane Colley L /�h/� and to a temperature of 600 F.
Phone (907)564-5775 n�re
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
ime 3. Field 4. Operator
6
Sold
0
7.
Reinjected
15,621,940
8.
Flared or vented 1 hour or less
238
9.
Flared or vented more than 1 hour (see instr.1
3,233
10.
Pilot and Purge
0
11.
Assist Gas
0
12.
Fuel gas used in lease operations
0
13.
Other (see instructions)
0
A
14.
TOTAL VOLUME (ITEMS 6-13)
15,625,411
15.
NGL Gas Equivalent
16.
Purchased gas
694,358
N
17.
Transferred from.
18.
Transferred to. (Express as a negative #)
Is
Remarks Blocks 6 -14 include only produced gas from Northstar (includes tract operations
used as follows (all in mscf): fuel
gas 621,539, pilot purge 5,280, injection 67,539.
and correct to the best of my
Name
Use
Use
C" ommissioner
and NS34A but not gas from PBU).
Apr -2013
pool as a percent of
1
32.3
G -:'3 /3
Date
was
Signature Title Manager, Production Taxes and o alties Alaska Note: All volumes must be corrected to
Printed �r � � JrRy, pressure of 14.65 psia and to a
Name Diane Colley (G fff Phone (907)564-5775 Date �/ /C.t// temperature of 60o F. Authority 20
j/LF
6112113
Northstar Gas Flaring Incident Report
4/1/2013 - 4/30/2013
Start Date / Time End Date / Time Minutes MCF Incident Cause / Description
Planned Less Than 1 Hour
238
Group Total 238
Planned Greater Than 1 Hour
Group Total 0
Unplanned Less Than 1 Hour
Group Total 0
Unplanned Greater Than 1 Hour
Remediation Taken Event Type
CGF upset and shutdown. Fuel
gas supply valve ZA-9421 CGF stabilized and fuel gas
4/22/2013 5:29 4/22/2013 20:08closed resulting in plant supply valve opened.
3,233 shutdown. Restarted plant. Other
Group Total 3,233
Report Total 3,471
NSTR FlarelncidentDetails 04-2013 FINAL.xis
Flare
HP1, HP2, LP
5/10/2013 10:01 AM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY RFPnRT nF panni If Cn SAO nIC%r%r%r%iTm. wm
M
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
me 3. Field
N1 4. Operator
Northstar BP
1Oo Volume N.C. 20. For production from multiple pools, list contribution of
6
Sold
0
T
Reinjected
14,514,683
8.
Flared or vented 1 hour or less
5,653
9.
Flared of vented more than 1 hour (see instr.)
8,306
10.
Pilot and Purge
0
11.
Assist Gas
0
12.
Fuel gas used in lease operations.
0
13.
Other (see instructions)
0
P
14.
TOTAL VOLUME (ITEMS 6-13)
14,528,642
15.
NGL Gas Equivalent
16.
Purchased gas
632,152
to
17.
Transferred from.
18.
Transferred to: (Express as a negative #)
19.
Remarks Blocks 6 - 14 include only produced gas from Northstar (includes tract operations
used as follows (all in mscf): fuel
gas 558,787, pilot purge 5,280, injection 68,085.
and
Use
Commissioner
but not gas from
pool as a percent
1
nn,r
MCF
Date
Gas purchased from PBU was
=aoy cemly mm me ',,,going is true and correct to the best of my knowledge.
Signature �// I� h /7 7ttemperauturemof
Al volues must be corrected to
/ tem T!r 41J e__ L.ott�i� Title Manager, Production Taxes and Royalties Alaskasre of 14.65 psia and to a
Printed / /
Name Diane Colley Phone (907)564-5775 Date 600 F. Authority 20
Northstar Gas Flaring Incident Report
6/1/2013 - 6/30/2013
Start Date / Time End Date / Time Minutes MCF Incident Cause / Description
Planned Less Than 1 Hour
4,612
Group Total 4,612
Planned Greater Than 1 Hour
6/2/2013 20:12 6/2/2013 21:15 62
6/3/2013 18:20
6/3/2013 20:27
127
6/3/2013 22:03
6/3/2013 23:51
109
6/4/2013 19:04
6/4/2013 23:01
238
6/5/2013 1:00
6/5/2013 2:13
73
6/5/2013 2:50
6/5/2013 3:55
65
6/5/2013 7:17
6/5/2013 10:03
166
6/6/2013 0:00
6/6/2013 7:30
450
6/9/2013 8:11
6/9/2013 9:21
71
6/9/2013 9:23
6/9/2013 11:54
151
Remediation Taken
Event Type
Commissioning HP1
Commissioning HP1
Commissioning HP1
Commissioning HPI
Commissioning HP1
Commissioning HP1
Commissioning HP1
Commissioning HP1
Equipment
Outage HP1
Equipment
Outage HP1
Flare
NSTR FlarelncidentDetails 06-2013 FINAL REV1.xls 7/15/2013 2:24 PM
Depressuring NS -7 through
test seperator to unload it and
188
bring it on line
Planned controlled flaring
Depressuring NS -7 through
test seperator to unload it and
500
bring it on line
Planned controlled flarinc
Depressuring NS -7 through
-
test seperator to unload it and
553
bring it on line
Planned controlled flaring
Depressuring NS -7 through
test seperator to unload it and
969
bring it on line
Planned controlled flaring
Depressuring NS -7 through
test seperator to unload it and
271
bring it on line
Planned controlled flaring
Depressuring NS -7 through
test seperator to unload it and
242
bring it on line
Planned controlled flaring
Depressuring NS -7 through
test seperator to unload it and
802
bring it on line
Planned controlled flaring
Depressuring NS -7 through
test seperator to unload it and
2,120
bring it on line
Planned controlled flaring
Proration lifted and attempting
Finally started HP -A and
615
to start HP -A compressor
increased plant rates
Proration lifted and attempting
Finally started HP -A and
788
to start HP -A compressor
increased plant rates
Event Type
Commissioning HP1
Commissioning HP1
Commissioning HP1
Commissioning HPI
Commissioning HP1
Commissioning HP1
Commissioning HP1
Commissioning HP1
Equipment
Outage HP1
Equipment
Outage HP1
Flare
NSTR FlarelncidentDetails 06-2013 FINAL REV1.xls 7/15/2013 2:24 PM
Group Total 7,048
Unplanned Less Than 1 Hour
1,041
Group Total 1,041
Unplanned Greater Than 1 Hour
Adjusted well set to
Ambient temperatures, wind compensate for temperature
6/17/2013 11:12 6/17/2013 16:21 309 628 direction change, and well set swings in plant. Other LP
Adjusted well set to
Ambient temperatures, wind compensate for temperature
6/17/2013 11:17 6/17/2013 16:10 294 630 direction change, and well set swings in plant. Other HP1
Group Total 1,258
Report Total 13,959
NSTR FlarelncidentDetails 06-2013 FINAL REV1.x1s 7/15/2013 2:24 PM
Hunt, Jennifer L (DOA)
From: AK, HSSEE Env Adv North [ACTENVADVISOR@BP.com]
Sent: Tuesday, June 11, 2013 8:36 AM
To: Roby, David S (DOA); Ferguson, Victoria L (DOA); Hunt, Jennifer L (DOA)
Cc: AK, OPS Nstar O&M TL; AK, OPS Nstar Lead Tech; AK, OPS Nstar DIM; Cooke, Alison D;
Fiedler, Anne M; Mason, Ann M (HOEFLER CONSULTING GROUP (HCG)); AK, HSSEE Env
TL (North Slope)
Subject: Northstar Planned Flaring Events June 2 - 5 and June 9
To: Dave Roby, AOGCC
Victoria Ferguson, AOGCC
Jennifer Hunt, AOGCC
BPXA is providing courtesy notification of planned flaring events of greater than one hour which occurred at the Northstar
Production Facility from June 2 through June 5, 2013 and then again on June 9, 2013.
The first event occurred at 20:12 hours on June 2 with the last event occurring at 09:23 hours on June 9. There were two
causes of these multiple flaring events. Flaring events from June 2 through June 5 were a result of the depressurizing of
Northstar well NS -07 through the test separator to unload it and bring it online. Approximately 1500 Bbl of water was
pumped down -hole during well work activities and it was necessary to lower the pressure in the test separator to get the
water to flow to the surface.
The two flaring events that occurred on June 9 were a result of the TAPS proration. As production rates slowed a
compressor unexpectedly tripped off-line as wells were shut in and it was necessary to flare .
Summary of planned flaring events:
June 2, 2013 (62.23 min, 187.69 MSCF)
June 3, 2013 (126.67 min, 500 MSCF)
June 3, 2013 (108.83 min, 552.55 MSCF)
June 4, 2013 (237.50 min, 968.56 MSCF)
June 5, 2013 (72.83 min, 270.83 MSCF)
June 5, 2013 (65.33 min, 242.33 MSCF)
June 5, 2013 (166.33 min, 802.38 MSCF)
June 9, 2013 (70.50 min, 615.35 MSCF)
June 9, 2013 (150.83 min, 788.29 MSCF)
All attempts were made with the intent to unload the well to allow natural flow. Flaring for this purpose was kept to a
minimum necessary to reduce well tubing pressure. Given these circumstances, we believe that we took all necessary
actions in accordance with good oil field engineering practices and conservation purposes to minimize the volume of gas
released, burned, or permitted to escape to the air. These volumes will also be reported to you on the Facility Report of
Produced Gas Disposition Form (Form 10-422).
Please let us know if you have any questions or require additional information.
Thanks,
Trey Drake
AK, HSSEE Environmental Advisor North
W (907)659-6810
Pager 659-5272, #4313
Harmony (907)659-6441
Alternate: Ken Miller
Jennifer L
From: AK, HSSEE Env Adv North [ACTENVADVISOR@BP.com]
Sent: Thursday, June 20, 2013 5:08 PM
To: Roby, David S (DOA); Ferguson, Victoria L (DOA); Hunt, Jennifer L (DOA)
Cc: AK, OPS Nstar O&M TL; AK, OPS Nstar Lead Tech; AK, OPS Nstar OIM; Cooke, Alison D;
Fiedler, Anne M; Mason, Ann M (HOEFLER CONSULTING GROUP (HCG)); AK, HSSEE Env
TL (North Slope); Mihm, Kevin
Subject: Northstar unplanned flaring event notification: June 17
To: Dave Roby, AOGCC
Victoria Ferguson, AOGCC
Jennifer Hunt, AOGCC
BPXA is providing courtesy notification of 1 unplanned flaring event of greater than one hour which occurred at the
Northstar Production Facility on June 17, 2013. The unplanned event occurred from 11:12 to 16:24 when a maintenance
worker inadvertently caused an upset condition resulting in the loss of the LP compressor.
Summary of unplanned flaring event:
June 17, 2013 (312 minutes, 1,265 MCF)
All attempts were made to identify problems, expedite maintenance, and keep flaring & assist gas to a minimum. Given
these circumstances, we believe that we took all necessary actions in accordance with good oil field engineering practices
and conservation purposes to minimize the volume of gas released, burned, or permitted to escape to the air. These
volumes will also be reported to you on the Facility Report of Produced Gas Disposition Form (Form 10-422).
Thanks,
Ken Miller
AK, HSSEE Environmental Advisor North
W (907)659-6810
Pager 669-5272, #4313
Harmony (907)659-6441
Alternate: Trey Drake
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number2.
0290000025
Facility Name
N1
3. Field
Northstar
4. Operator 5. Month/Year of Disposition
I BID I Jul -2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of Total
Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
13,251,769
-
Northstar 590100 93.98%
Northstar 590150 6.02%
8. Flared or vented 1 hour or less
3,717
100.00%
9. Flared or vented more than 1 hour (see instr.)
3,837
10. Pilot and Purge
0
11. Assist Gas
0
12. Fuel gas used in lease operations.
0
13. Other (see instructions)
0
Official Use Only
Authorization hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-13)
13,259,323
Lease Use
TC F
15. NGL Gas Equivalent
Conservation
MCF
16. Purchased gas
593,329
waste:
MCF
17. Transferred from:
i
mmission r Date
18. Transferred to: (Express as a negative #)
19. Remarks Blocks 6 - 14 include only produced gas from Northstar (includes tract operations NS08 and NS34A but not gas from PBU). Gas purchased from PBU was
used as follows (all in nrl fuel gas 519,978, pilot purge 5,456, injection 67,895.
1 hereby certify that the foregoing is true and coned to the best of my knowledge.
Note: All volumes must be corrected to
Signature Title Manager, Production Taxes an Ro alties Alaska pressure of 14.65 psia and to a
Printed / 2 temperature of 60o F. Authority 20
Name Diane Coll Phone 907)564-5775 Date �J AAC25.235.
Northstar Gas Flaring Incident Report
7/1/2013 - 7/31/2013
Start Date / Time
End Date / Time Minutes
MCF
Planned
Less Than 1 Hour
Outage HP2
112
Group Total
112
Planned
Greater Than 1 Hour
Group Total
0
Unplanned
Less Than 1 Hour
3,605
Group Total
3,605
Incident Cause / Description
Unplanned Greater Than 1 Hour
Fire and gas PM's shut down
7/8/201316:17 7/8/201317:18 61 1,620 plant
7/13/2013 14:06 7/13/2013 17:15 189 2,217 HP B Acoustic Tube Leak
Group Total 3,837
Report Total 7,554
NSTR FlarelncidentDetails 07-2013 FINAL.xis
Remediation Taken Event Type Flare
Normal start up procedure
Upset HP2
Shutdown HP B Replace
Equipment
Probe
Outage HP2
8/13/2013 9:46 AM
Hunt, Jennifer L (DOA)
From: AK, HSSEE Env Adv North [ACTENVADVISOR@BP.com]
Sent: Tuesday, July 09, 2013 1:09 PM
To: Roby, David S (DOA); Ferguson, Victoria L (DOA); Hunt, Jennifer L (DOA)
Cc: AK, OPS Nstar O&M TL; AK, OPS Nstar Lead Tech; AK, OPS Nstar OIM; Cooke, Alison D;
Fiedler, Anne M; Mason, Ann M (HOEFLER CONSULTING GROUP (HCG)); AK, HSSEE Env
TL (North Slope); Mihm, Kevin
Subject: Northstar Unplanned Flaring Event Notification: July 8, 2013
To: Dave Roby, AOGCC
Victoria Ferguson, AOGCC
Jennifer Hunt, AOGCC
BPXA is providing courtesy notification of 1 unplanned flaring event of greater than one hour which occurred at the
Northstar Production Facility on July 8, 2013. The unplanned event occurred from 16:17 to 17:18. Annual fire and gas
detection system testing was being conducted at the Northstar Facility to ensure integrity of the system. Test plans
included steps to prevent facility shut down during the functional testing. Due to miscommunication between the
operations team and the fire and gas inspection team, a fire pull station not in the test plan was activated, which resulted
in a facility shutdown and blow down of all gas in the facility.
Summary of unplanned flaring event:
July 8, 2013 (60.67 minutes, 1,620.25 MCF)
All attempts were made to identify problems, expedite maintenance, and keep flaring & assist gas to a minimum. Given
these circumstances, we believe that we took all necessary actions in accordance with good oil field engineering practices
and conservation purposes to minimize the volume of gas released, burned, or permitted to escape to the air. These
volumes will also be reported to you on the Facility Report of Produced Gas Disposition Form (Form 10-422).
Thanks,
Trey Drake
AK, HSSEE Environmental Advisor North
W (907)659-6810
Pager 659-5272, #4313
Harmony (907)659-6441
Alternate: Ken Miller
Hunt, Jennifer L
From: AK, HSSEE Env Adv North [ACTENVADVISOR@BP.com]
Sent: Monday, July 15, 2013 12:13 PM
To: Roby, David S (DOA); Ferguson, Victoria L (DOA); Hunt, Jennifer L (DOA)
Cc: AK, OPS Nstar O&M TL; AK, OPS Nstar Lead Tech; AK, OPS Nstar OIM; Cooke, Alison D;
Fiedler, Anne M; Mason, Ann M (HOEFLER CONSULTING GROUP (HCG)); AK, HSSEE Env
TL (North Slope); Mihm, Kevin
Subject: Northstar Unplanned Flaring Event Notification: July 13, 2013
To: Dave Roby, AOGCC
Victoria Ferguson, AOGCC
Jennifer Hunt, AOGCC
BPXA is providing courtesy notification of 1 unplanned flaring event of greater than one hour which occurred at the
Northstar Production Facility on July 13, 2013. The unplanned event occurred from 14:02 to 17:21. A failure of an
acoustic wand caused a shutdown of the HP compressor.
summary of unplanned flaring event:
July 13, 2013 (199 minutes, 3, 508 MCF)
All attempts were made to identify problems, expedite maintenance, and keep flaring & assist gas to a minimum. Given
these circumstances, we believe that we took all necessary actions in accordance with good oil field engineering practices
and conservation purposes to minimize the volume of gas released, burned, or permitted to escape to the air. These
volumes will also be reported to you on the Facility Report of Produced Gas Disposition Form (Form 10-422).
Thanks,
Ken Miller
AK, HSSEE Environmental Advisor North
W (907)659-6810
Pager 659-5272, #4313
Harmony (907)659-6441
Alternate: Trey Drake
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000025
12. Facility Name
1 N1
3. Field
Northstar
4. Operator 5. Month/Year of Disposition
I BP Au -2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of Total
Volume.
6. Sold
U
Pool Name Pool Code Percent
7. Reinjected
14,648,965
Northstar 590100 94.55%
Northstar 590150 5.45%
8. Flared or vented 1 hour or less
887
100.00%
6. Flared or vented more than 1 hour (see instr.)
13,477
10, Pilot and Purge
0
11. Assist Gas
0
12. Fuel gas used in lease operators.
0
13. Other (see instructions)
0
Official Use Only
Authorization >i hr
Safety
2 /l
117
MCF
14. TOTAL VOLUME (ITEMS 6.13)
14,663,329
Lease Use
MCF
15. NGL Gas Equivalent
Conservation
MCF
18. Purchased gas
633,663
Waste:
MCF
17. Transferred from
Q
I- 4415
Commissioner Date
18. Transferred to: (Express as a negative #)
1e. Remarks Blocks 6 - 14 include only produced gas from Northstar (includes tract operations NS08 and NS34A but not gas from PBU). Gas purchased from PBU was
used as follows (all in mscf): fuel gas 561,517, pilot purge 5,456, injection 66,690.
1 hereby certify thattheforegoing is true andcorrect to the best of my knowledge.
A j,9 `��-0� Note: All volumes must be corrected to
signature Cv(Yv/ � Title Manager, Production Taxes and Royal ies Alaska pressure of 14.65 psia and to a
Printed n J % /� temperature of 60o F. Authority 20
Name Diane Coll e Phone (907)564-5775 Date '7 f FJ AAC25.235.
VL -J=
4!3/ r 5t
Northstar Gas Flaring Incident Report
8/1/2013 - 8/31/2013
Start Date / Time
End Date / Time Minutes
MCF
Incident Cause / Description
Planned
Less Than 1 Hour
656
Group Total
656
Planned
Greater Than 1 Hour
8/8/2013 5:44
8/8/2013 7:22 98
226
NGL test
TAPS Shutdown/Northstar
8/11/20132:00
8/12/201316:44 2324
13,163
BESD Testing
Group Total
13,389
Unplanned Less Than 1 Hour
231
Group Total 231
Unplanned Greater Than 1 Hour
8/22/2013 20:58 8/22/2013 23:18 140
Group Total
Adjustment of well set and
88 plant temperatures
88
Report Total 14,364
NSTR FlarelncidentDetails 08-2013 FINAL.xis
Remediation Taken Event Type Flare
Brought System back up to
operating setpoints Other
Scheduled Outage, no action
taken Other
Adjusted incoming well rates
to compensate for plant
temperature swings Other
HP1
LP, HP1,
HP2
LNU
9/11/2013 1:49 PM
L
From: AK, HSSEE Env Adv North [AKHSSEEEnvAdvNorth@bp.com]
Sent: Saturday, August 17, 2013 10:48 AM
To: Roby, David S (DOA); Ferguson, Victoria L (DOA); Hunt, Jennifer L (DOA)
Cc: AK, OPS Nstar O&M TL; AK, OPS Nstar Lead Tech; AK, OPS Nstar OIM; Cooke, Alison D;
Fiedler, Anne M; Mason, Ann M (HOEFLER CONSULTING GROUP (HCG)); AK, HSSEE Env
TL (North Slope); Mihm, Kevin
Subject: Northstar Planned Flaring Event Notification: August 11, 2013
To: Dave Roby, AOGCC
Victoria Ferguson, AOGCC
Jennifer Hunt, AOGCC
BPXA is providing courtesy notification of planned flaring events of greater than one hour which occurred intermittently at
the Northstar Production Facility from August 11 through 13, 2013.
The flaring event began at 02:00 hours on August 11 with the last event occurring at 17:06 hours on August 13. A total of
6,040 MCF of gas was flared during these events.
The intermittent flaring events that occurred during August 11-13 were a result of the TAPS proration. As production rates
slowed a compressor came off-line as wells were shut in and it was necessary to flare.
All attempts were made with the intent to unload the well to allow natural flow. Flaring for this purpose was kept to a
minimum necessary to reduce well tubing pressure. Given these circumstances, we believe that we took all necessary
actions in accordance with good oil field engineering practices and conservation purposes to minimize the volume of gas
released, burned, or permitted to escape to the air. These volumes will also be reported to you on the Facility Report of
Produced Gas Disposition Form (Form 10-422).
Please let us know if you have any questions or require additional information.
Thanks,
Ken Miller
AK, HSSEE Environmental Advisor North
W (907)659-6810
Pager 659-5272, #4313
Harmony (907)659-6441
Alternate: Trey Drake
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000025
2. Facility Name
N1
3. Field
Northstar
4. Operator
I BP
5. MonthNear of Disposition
I Sep -2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of Total
Volume.
6. Sold
0
Pool Name Pool Code Percent
7, Reinjected
14,957,301
Northstar 590100 94.85%
Northstar 590150 5.15%
8. Flared or vented 1 hour or less
1,988
100.00%
9. Flared or vented more than 1 hour (see instr.)
584
10. Pilot and Purge
0
11. Assist Gas
0
12. Fuel gas used in lease operations.
0
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr'.
Safety
���
MCF
14. TOTAL VOLUME (ITEMS 6.13)
14,959,873
Lease Use
MCF
15, NGL Gas Equivalent
Conservation
MCF
16. Purchased gas
645,118
Waste:
MCF
17. Transferred from:
/ / ,[
T
r Commissioner -/,/
G Date
18. Transferred to: (Express as a negative #)
19. Remarks Blocks 6 - 14 include only produced gas from Northstar (includes tract operations NS08 and NS34A but not gas from PBU). Gas purchased from PBU was
used as follows (all in mscf): fuel gas 568,864, pilot purge 5,280, injection 70,974.
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
/� I Note: All volumes must be corrected to
Signature /�/l/ C�jJ rue Manager, Production Taxes and Roy Ities Alaska pressure of 14.65 psia and to a
Printed (� /' 2 temperature of 60o F. Authority 20
Name Diane Colley Phone (907)564-5775 Date —J AAC2 .2 5.
Northstar Gas Flaring Incident Report
9/1/2013 - 9/30/2013
Start Date / Time End Date / Time Minutes MCF Incident Cause / Description Remediation Taken
Planned Less Than 1 Hour
1,649
Group Total 1,649
Planned Greater Than 1 Hour
Take down HPA water wash
and fuel mapping. LP flaring
from HPA starter gas. HP
flaring cade blowdown, purging
9/30/2013 8:42 9/30/2013 9:51 69 331 and well optimization None Required
Group Total 331
Unplanned Less Than 1 Hour
339
Group Total 339
Unplanned Greater Than 1 Hour
HPA tripped offline while
9/29/2013 15:50 9/29/2013 16:57 67 253 mapping HPB
Group Total 253
Report Total 2,572
Event Type Flare
Equipment
Outage HP1
Adjusted wellset to mitigate Equipment
flaring Outage
HP1
NSTR FlarelncidentDetails 09-2013 FINAL.xls 10/9/2013 2:18 PM
Hunt, Jennifer L
From: AK, HSSEE Env Adv North [AKHSSEEEnvAdvNorth@bp.com]
Sent: Tuesday, October 01, 2013 8:56 AM
To: Roby, David S (DOA); Ferguson, Victoria L (DOA); Hunt, Jennifer L (DOA)
Cc: AK, OPS Nstar O&M TL; AK, OPS Nstar Lead Tech; AK, OPS Nstar OIM; Cooke, Alison D;
Fiedler, Anne M; Mason, Ann M (HOEFLER CONSULTING GROUP (HCG)); Mihm, Kevin;
AK, HSSEE Env TL (North Slope)
Subject: t4orthstar;.Wnplanned Faring Event Notification: September 29 - 30, 2013
To: Dave Roby, AOGCC
Victoria Ferguson, AOGCC
Jennifer Hunt, AOGCC
BPXA is providing courtesy notification of 2 unplanned flaring events of greater than one hour which occurred at the
Northstar Production Facility on September 29, 2013 and again on September 30, 2013. Both of the unplanned flaring
events that are summarized below were due to the HPA shutting down during mapping.
Summary of unplanned flaring event:
September 29, 2013 from 15:50 to 16:57 (66.50 minutes, 252.87 MCF)
September 30, 2013 from 08:42 to 09:51 (69.00 minutes, 331.21 MCF)
these circumstances, we believe that we took all necessary actions in accordance with good oil field engineerinAll attempts were made to identify problems, expedite maintenance, and keep flaring & assist gas to a minimum. Given
g practices
and conservation purposes to minimize the volume of gas released, burned, or permitted to escape to the air. These
volumes will also be reported to you on the Facility Report of Produced Gas Disposition Form (Form 10-422).
Thanks,
Trey Drake
AK, HSSEE Environmental Advisor North
W (907)659-6810
Pager 659-5272, #4313
Harmony(907)659-6441
Alternate: Ken Miller
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
6.
Sold
0
7.
Reinjected
16,199,491
8.
Flared or vented 1 hour or less
267
9.
Flared or vented more than 1 hour (see instr.)
199
10.
Pilot and Purge
0
11.
Assist Gas
0
12.
Fuel gas used in lease operations.
0
13.
Other (see instructions)
0
14.
TOTAL VOLUME (ITEMS 6-13)
16,199,957
15,
NGL Gas Equivalent
16.
Purchased gas
680,115
b
ed from:ed
EE
to: (Express as a negative #)
19.
Remarks Blocks 6 - 14 include only produced gas from Northstar (includes tract operations
used as follows (all in mscf): fuel
gas 605,173, pilot purge 5,456, injection 69,486.
--. -_...a /-, ��� - iu, eyvu.9 ,.,,a .a�no correct to the best of my
Signature 1 / N// //I�rinted
Name Diane Collev
Safety
Use
Volume.
P.- 1„�
Commissioner
and NS34A but not gas
pool as a
L -4-/
Dale
Gas purchased from PBU was
Title Manager, Production Taxes and o a ties Alaska Note: All volumes must be corrected
y All
of 14.66 psis and to a
�/ I ) Q/ 1 temperature of SOO F. Authority 20
lone (907)564-5775 Date /�.J.J
1--L
1-`3/! 4
Northstar Gas Flaring Incident Report
10/1/2013 - 10/31/2013
Start Date / Time End Date / Time Minutes MCF Incident Cause / Description Remediation Taken Event Type Flare
Planned Less Than 1 Hour
0
Group Total 0
Planned Greater Than 1 Hour
Utilizing test separator/flare to
de
10/12/2013 21:42 10/12/2013 23:47 125 199 safepressure well equipment for Equipment Safe
No action re
Group Total 199 required Out HPI
Unplanned Less Than 1 Hour
267
Group Total 267
Unplanned Greater Than 1 Hour
0
Group Total 0
Report Total 466
NSTR FlarelncidentDetails 10-2013 FINAL.xis
11/7/20131:21 PM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PROD[imm r:oc nicDncrrinKl
1. Facility Number 2. Facility Name
0290000025 N1
Disposition
Vo20.
3. Fieldn2,164
4. Operator S. Month/Year of Disposition
BP NOV-2013
For production from multiple pools, list contribution of each pool as a percent of Total
Volume.
6. Sold
Pool Name Pool Code Percent
7. Reinjected
16
Northstar 590100 95.50%
Northstar 590150 4.50%
e. Flared or vented I hour or less
100.00%
Q. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
0
11. Assist Gas
0
12. Fuel gas used in lease operations.
D
13. Other (sea instructions)
0
Official Use Only
Authorization >I hr
Safety
MCF
td. TOTAL VOLUME (ITEMS 6-13)
16,775,676
Lease Use
MCF
15. NGL Gas Equivalent
Conservation
MCF
16. Purchased gas
682,491
Wasia:
MCF
17. Transferred from:
Commissioner Date
18. Transferred to: (Express as a negative #)
19. Remarks Blocks 6 -14 include only produced gas from Northstar (includes tract operations NS08 and NS34A but not gas from PBU). Gas purchased from PBU was
used as follows (all in mscf): fuel gas 617,777, pilot purge 5,280, injection 59,434.
1 hereby cer iy that the foregoing is tore and coned to the best cf my knowledge.
[Note: All volumes must be corrected to
Signature Title Manager, Production Taxes and Royalties Alaska pressure of 14.65 psia and to a
Printed
Name Diane Colley Phone 90 temperature of 60o F. Authority 20
7)564-5775 Date AAC25.235.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS niSpnRITinti
1. Facility Number 2. Facility Name
0290000025 N1
Disposition
3. Field
Northstar
Volume MCF
4. Operator 5. Month/Year of Disposition
1 BP Dec -2013
20. For production from multiple pools, list contribution of each pool as a percent of Total
Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
17,532,434
Northstar 590100 95.86%
Northstar 590150 4.14%
6. Flared or vented 1 hour or less
3,195
100.00%
9. Flared or vented more than 1 hour (see instr.)
1,816
10. Pilot and Purge
0
11. Assist Gas
0
12. Fuel gas used in lease operations.
0
13. Other (see instructions)
0Official
Use Only
Authorization>1 he
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.13)
17,537,445
Lease Use
MCF
15. NGL Gas Equivalent
Conservation
MCF
is. Purchased gas
719,915
Waste.
MCF
17. Transferred from
1_1
/ Commissioner m !Date
la Transferred to (Express as a negative #)
19. Remarks Blocks 6 - 14 include only produced gas from Northstar (includes tract operations NS08 and NS34A but not gas from PBU). Gas purchased from PBU was
used as follows (all in mscf): fuel gas 660,141, pilot purge 5,456, injection 54,318.
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
J�/ �j Note: All volumes must be corrected to
Signature tYl i�;{'r�/,. Title Manager, Production Taxes and Ro alties Alaska pressure of 14.65 psia and to a
Printed 1 temperature of 600 F. Authority20
Name Diane Colleyf Phone(907)564-5775 Date Pill ("j AAC25.2 5.
Northstar Gas Flaring Incident Report
12/1/2013 - 12/31/2013
Start Date / Time
End Date/ Time Minutes
MCF
Incident Cause / Description
Remediation Taken
Event Type
Flare
Planned
Less Than 1 Hour
1,163
Group Total
1,163
Planned
Greater Than 1 Hour
Testing and Calibration of Flow
12/27/2013 7:36
12/27/2013 9:55
208
Meter
None
Other
HP1
Testing and Calibration of Flow
12/27/201310:07
12/27/201311:13
61
Meter
None
Other
HP1
Testing and Calibration of Flow
12/27/201311:16
12/27/201314:29
183
Meter
None
Other
HP1
Group Total
452
Unplanned
Less Than 1 Hour
2,032
Group Total
2,032
Unplanned
Greater Than 1 Hour
Temporary repair and
12/15/2013 2:25
12/15/2013 6:01
646
Valve Leakby
continued operational
awareness
Other
LP
Temporary repair and
12/15/2013 6:47
12/15/2013 11:15
719
Valve Leakby
continued operational
awareness
Other
LP
Group Total
1,364
Report Total 5,011
NSTR FlarelncidentDetails 12-2013 FINAL.xls 1/9/2014 9:39 AM