STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000000
2. Facility Name
PBU CCPtFFGU
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
I January -2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
1,362,960
Pool Name Pool Code Percent
7. Reinjected
227,252,198
PRUDHOE 640150 100.007/.--
00.00%8.
8.Flared or vented 1 hour or less
1,634
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
34,968
11. Assist Gas
0
12. Fuel gas used in lease operations.
6,453,777
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
235,105,537
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
DMCF
Waste:
17. Transferred from: CGF & FS1
235,105,537
Commissioner Dale
18. Transferred to: (Express as a negative #)
O
19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar; Block 12: Includes COTP Non-PBU Fuel Gas = 4,715 mscf; Block 18:
Fuel Gas to LPC = 0 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
^^ Note: All volumes must be corrected
Signature_ �/I Tale Mana Manager Production Taxes and Royalties Alaska t0 pressure Of 14.65 psia and to a
Im 122b
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC. Page 1
PRUDHOE BAY UNIT -CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
January 2013
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
1/21/2013 0400-0445 159 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
1/31/2013 2139-2144 45
TOTAL 204
Unplanned Events greater than 1 hour
DATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Accidental Gas Release See attachments
TOTAL 0
Planned Events Less Than or Equal 1
Hour AND <= 5,000 mcf
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT&CAUSE ACTION TAKEN TO ELIMINATE CAUSE
1/17/2013
0735-0740
141 See attachments See attachments
1/17/2013
1240-1245
408
1/17/2013
1251-1256
408
1/27/2013
0140-0145
77
1/27/2013
0356-0401
8
1/27/2013
0512-0517
159
1/27/2013
0811-0816
93
1/27/2013
0852-0857
91
1/31/2013
2100-2105
45
TOTAL
1,430
Planned Events Exceeding 1 Hour OR a, 5,000 mcf
DATE TIME
VOLUME DESCRIPTION OF INCIDENT&CAUSE ACTION TAKENTO ELIMINATE CAUSE
See attachments See attachments
TOTAL
0
TOTAL
Unplanned Events < 1 Hour
204
Unplanned Events> 1 Hour
0
Planned Events< 1 hour and not
1,430
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
34,968
Assist
0
TOTAL FLARED VOLUME
36,602 2/13/2013
3:46 PM
Flare Start Date 01/01/2013
Flare End Date 01/31/2013
CCP Flare Report Total Volume(MSCF) 1634
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
13-21 Controlled Blowdown 01/17/2013 7:3500 am 7:40.00 am 5 min No No Yes BP11KOSMBO 141
Determination Cause T\C 1813 shutdown for planned maintenance
Action Taken 1813 T/C depressurized and shut down.
13-21 Controlled Blowdown 01/17/2013 12:40:00 pm 12:45:00 pm 5 min No
Determination Cause TIC 1878 shutdown for unplanned maintenance
Action Taken 1878 T/C depressurized and shut down.
13-21 Controlled Slowdown 01/17/2013 12:51:00 pm 12:56:00 pm 5 min No
Determination Cause T\C 1876 shutdown for unplanned maintenance
Action Taken 1876 TIC depressurized and shut down.
No
Yes
BP7\KOSM80
408
No
Yes
BP1XKOSMBO
408
13-44 Controlled Slowdown 01/27/2013 1:40:00 am 1:45:00 am 5 min No No
Determination Cause TIC 1812 Depressured from suction pressure to 50 PSI after leak testing was completed.
Action Taken TIC 1812 Depressuring stopped at 50 PSI.
1344 Controlled Blowdown 01/27/2013 3:56:00am 4:01:00am 5min No No Yes BP7\TOWNER 8
Determination Cause T/C 1812 Depressured from 175 PSI to 50 PSI for restart.
Action Taken TIC 1812 Depressured to 50 PSI and stopped.
13-44 Controlled Blowdown 01/27/2013 51200 am 517:00 am 5 min No No Yes BP1\TOWNER 159
Determination Cause TIC 1811 depressured for tubing replacement.
Action Taken T/C 1811 depressured to Zero PSI.
1344 Controlled Slowdown 01/27/2013 8:11:00 am 8:16:00 am 5 min No No Yes BPI\GAMBHO 93
Determination Cause TIC 1811 Depressured from suction pressure to 0 when a problem was found during a leak test.
Action Taken T/C 1811 depressurization completed.
1344 Controlled Blowdown 01/27/2013 8:52:00 am 8:57:00 am 5min No No Yes BP1\GAMBHO 91
Determination Cause T/C 1811 Depressured to 200 psi after leak test was completed.
Action Taken T/C 1811 Depressured from suction pressure to 200 psi and stopped for start up.
13-49 Controlled Slowdown 01/31/2013 9:00:00 pm 9:05:00 pm 5 min No No Yes BP7\BAKERWF 45
Determination Cause -RC 1813 pressure testing to 500 psi then depressured.
Action Taken 1813 T/C depressurization completed.
Total Volume (MSCF) 1634
Generated 02/04/2013 3:54:59PM Page i of 10
McMains, Stephen E (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj
Sent: Friday, February 01, 2013 8:29 AM
To: McMains, Stephen E (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, OPS CGF OTL; O'Riordan, Colm J; AK, HSSEE Env Adv East; AK, OPS
CCP CGF OSM
Subject: Gas flaring event at CGF v
To: Steve McMains, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
steve.mcmainsCcDalaska.gov dave.robvaDalaska.gov victoria.ferguson(aalaska.gov
From: Travis Rybicki, GPB Production Optimization Team Leader
A flaring event occurred at CGF starting at 01/20/2013 16:23 and stopping at 01/20/2013 18:58 with a volume of 27237
(MSCF). The event lasted for 155 minutes and was due to the unplanned shutdown of the CGF T/C 1805 MI
Compressor. Flaring continued while operations/maintenance performed troubleshooting. Flaring ended when the T/C
1805 unit was restarted, the unit was loaded, CGF process stabilized and flare valves closed.
Please let me know if you have any questions.
Travis M. Rybicki
PCC-EOC (Production Optimization) Team Lead
Office 907-659-4472 (BOC) 659-5566 (PBOC)
Cell 907-748-2118 Harmony 758-4404
GPB Pager 907-659-5272 # 1890
akopspcceoctl@bp. Com
Alternate: Kellie Okonek
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000000
2. Facility Name
PBU CCPIFFGU
3. Field
PBU - EOA
4. Operator
I BP
5. MonthNear of Disposition
February -2013
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
1,228,867
Pool Name Pool Code Percent
7. Reinjected
204,061,502
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
765
9. Flared or vented more than 1 hour (see insh.)
0
10. Pilot and Purge
31,965
11. Assist Gas
0
12. Fuel gas used in lease operations.
5,786,795
13. Other (see instructions)
1,005
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
211,110,899
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF&FS1
211,110,899
Commissioner Date
18. Transferred to: (Express as a negative #)
O
19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar; Block 12: Includes COTP Non-PBU Fuel Gas = 7,226 mscf; Block 18:
Fuel Gas to LPC = 1,005 mscf
I hereby certify that th/e� foregoing iss true and correct to the best of my knowledge.
Signature Note: All volumes must be corrected
6JllUl (1/ .(Ji%T! / I Title Mans er Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date , / AAC25.235.
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
February 2013
VOLUME
TOTAL 0
Page t
TOTAL
Not required for unplanned events <= 1 hr
Not required for unplanned events <= 1 hr
TOTAL
0
Planned Events <1 hour and not
765
Unplanned Events greater than Shour
Planned Events> 1 hour or
0
DATE TIME
DESCRIPTION OF INCIDENT&CAUSE
ACTION TAKENTO ELIMINATE CAUSE
Assist
0
Accidental Gas Release
See attachments
TOTAL
0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
2/1/2013 1928-1933
45
See attachments
See attachments
2/1/2013 2146-2151
45
2/3/2013 1523-1528
45
2/3/2013 1923-1928
14
2/13/2013 0450-0455
8
2/15/2013 1004-1009
141
2/15/2013 1120-1125
14
2/25/2013 1402-1407
45
2/26/2013 0902-0907
408
TOTAL
765
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
TOTAL 0
Page t
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events> 1 Hour
0
Planned Events <1 hour and not
765
exceeding 5,000 MCF
Planned Events> 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
31,965
Assist
0
31l3/2013
TOTAL FLARED VOLUME
32,730 9:52 AM AM
McMains, Stephen E (DOA)
From: Regg, James B (DOA)
Sent: Tuesday, February 19, 2013 4:12 PM
To: Ferguson, Victoria L (DOA); McMains, Stephen E (DOA)
Subject: FW: Notification: Uncontrolled Gas Release - Skid 50 - Greater Prudhoe Bay
FYI; typically these have been deemed waste by us in the past . Should be documented in their gas disposition report.
Jim Regg
AOGCC
333 W. 7th Ave, Suite 100
Anchorage, AK 99501
907-793-1236
From: AK, OPS PCC EOC TL [mailto:AKOPSPCCEOCTLCrilbp.com]
Sent: Tuesday, February 19, 2013 3:49 PM
To: Regg, James B (DOA)
Cc: AK, OPS FS3 CSM; AK, OPS Campaign Maint OSM; Burgess, David H; AK, OPS FS3 Facility OTL
Subject: Notification: Uncontrolled Gas Release - Skid 50 - Greater Prudhoe Bay
Jim,
I spoke to Bob Noble at the Deadhorse AOGCC Inspector office — 3:05pm today, shortly after my arrival back to
North Slope to inform him of this event. Per his request and the brief voice mail I left you:
At — 9am this morning BP was performing maintenance in the Skid 50 area on the NGL prover meter skid. An
uncontrolled gas release (liquid NGL—with associated vaporization) occurred. Actual cause and volume are
under investigation. The event is being managed as a Tier I incident.
There were no injuries or fires associated with this event.
We will follow up with the 5 & 30 day reports.
Regards,
Travis M. Rybicki
PCC-EOC (Production Optimization) Team Lead
Office 907-659-4472 (BOC) 659-5566 (PBOC)
Cell 907-748-2118 Harmony 7584404
GPB Pager 907-659-5272 # 1890
a ko OS Pcceoctl (Oi bo. Com
Alternate: Kellie Okonek
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODt1CFD GAS niSPnS1T1n1U
1. Facility Number 2. Facility Name
0290000000 PBU CCP/FFGU
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator •5. MonthNear of Disposition
BP March -2013
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume,
6. Sold
1,442,880
Pool Name PoolCode Percent
7. Reinjected
218,801,108
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
276
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
35,071
11. Assist Gas
0
12. Fuel gas used in lease operations.
6,356,532
13. Other (see instructions)
1,787
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
226,637,654
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF & FS1
226,637,654
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar; Block 12: Includes COTP Non-PBU Fuel Gas = 8,283 mscf; Block 18:
Fuel Gas to LPC = 1,787 mscf
I hereby certify that regoingris true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Manager Production Taxe2IQJLRo hies Alaska to pressure of 14.65 psis and to a
ill ,0 //� temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date J AAC25.235.
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
March 2013
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
3/18/2013 0920-0925 135 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 135
Unplanned Events greater than 1 hour
DATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Accidental Gas Release See attachments
TOTAL 0
DATE TIME VOLUME DESCRIPTION OF IN
3/30/2013 1650-1655 141 See attachments
TOTAL 141
See attachments
TOTAL 0
See attachments
See attachments
Page 1
4/10/2013
1:30 PM
TOTAL
Unplanned Events < 1 Hour
135
Unplanned Events> 1 Hour
0
Planned Events < 1 hour and not
141
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
35,071
Assist
p
TOTAL FLARED VOLUME
35,347
See attachments
See attachments
Page 1
4/10/2013
1:30 PM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000000
2. Facility Name
PBU CCPIFFGU
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
A rill -2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total volume.
6. Sold
1,251,479
Pool Name Pool Code Percent
7. Reinjected
207,548,043
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
2,807
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
34,242
11. Assist Gas
0
12. Fuel gas used in lease operations.
6,062,644
13. Other (see instructions)
2,971
Official Use Only
Authorization >1 hr.
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
214,902,186
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF & FSI
214,902,186
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar; Block 12: Includes COTP Non-PBU Fuel Gas = 6,358 mscf; Block 16:
Fuel Gas to LPC = 2,971 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature (� %�� Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date ,5 AAC25.235.
Form 10422 Rev. W009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
April 2013
DATE TIME VOLUME DESCRIPTIONOF INCIDENT&CAUSE ACTIONTAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 0
Unplanned Events greater than 1 hour
DATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Accidental Gas Release See attachments
TOTAL 0
Planned Events Less Than or Eaual 1 Hour AND <= 5.000 mcf
4/19/2013
4/19/2013
4/19/2013
4/19/2013
4/19/2013
4/20/2013
4/20/2013
4/20/2013
4/20/2013
4/20/2013
4/21/2013
4/21/2013
4/22/2013
4/22/2013
4/22/2013
4/23/2013
4/23/2013
4/24/2013
4/24/2013
0018-0023
0223-0228
2215-2220
2243-2248
2254-2259
0021-0026
0228-0233
0515-0520
0745-0750
2310-2315
0106-0111
0308-0313
0455-0500
0600-0610
0613-0616
0012-0017
0235-0240
0256-0301
0530-0535
TOTAL
141 See attachments
51
51
51
51
141
51
141
51
51
141
51
408
845
210
135
51
135
51
2,807
See attachments
Page 1
5/14/2013
10:22 AM
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
April 2013
See attachments
TOTAL 0
ACTION TAKEN TO ELIMINATE
See attachments
Page 2
5/14/2013
10:22 AM
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events > 1 Hour
0
Planned Events < 1 hour and not
2,807
exceeding 5,000 MCF
Planned Events> 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
34,242
Assist
0
TOTAL FLARED VOLUME
37,049
ACTION TAKEN TO ELIMINATE
See attachments
Page 2
5/14/2013
10:22 AM
Flare Start Date 04/01/2013
Flare End Date 04/30/2013
CCP Flare Report
Total Volume (MSCF) 2807
Report
Numbe System Date StartTime Stop Time Duration Intermittent
Black Smoke Planned Reported By Volume
13-182 Controlled Blowdown 04/19/2013 12:18:00 am 12:23:00 am 5 min No
No
Yes BP7\GAMBHO 141
Determination Cause T/C 1808 shut down for water wash and planned maintenance.
Action Taken T/C 1808 depressurization completed.
13-182 Controlled Blowdown 04/19/2013 2:23:00 am 2:28:00 am 5 min No
No
Yes BPl\GAMBHO 51
Determination Cause T/C 1808 depressured from 130 psi to 0 psi when spin cool was completed.
Action Taken TIC 1808 depressurization completed.
13-182 Controlled Blowdown 04/19/2013 10:15:00 pm 10:20:00 pm 5 min No
No
Yes BP1\GAMBHO 51
Determination Cause T/C 1808 depressured after water wash for valve sequence.
Action Taken TIC 1808 depressurization complete.
13-182 Controlled Blowdown 04/19/2013 10:43:00 pm 10:48:00 pm 5 min No
No
Yes BPl%GAMBHO 51
Determination Cause T/C 1808 valve sequence stopped because of pressure problem. Depressured to 0 psi.
Action Taken T/C 1808 depressurization completed.
13-182 Controlled Blowdown 04/19/2013 10:54:00 pm 10:59:00 pm 5 min No
No
Yes 131`1\GAMBHO 51
Determination Cause T/C 1808 ESD'd because of noise during start up. Depressured to 0 psi.
Action Taken TIC 1808 depressurtzation complete.
Daily Volume (MSCF) 345
13-185 Controlled Blowdown 04/20/2013 12:21:00 am 12:28:00 am 5 min No
No
Yes BPI\GAMBHO 141
Determination Cause T/C 1804 shutdown for water wash. Depressured to 0 psi.
Action Taken T/C 1804 depressurization completed.
13-185 Controlled Blowdown 04/20/2013 2:28:00 am 2:33:00 am 5 min No
No
Yes BP1\GAMBHO 51
Determination Cause T/C 1804 shutdown after spin cool and depressured from 135 psi to 0 psi.
Action Taken T/C 1804 depressurization completed.
13-185 Controlled Blowdown 04/20/2013 5:15:00 am 5:20:00 am 5 min No
Determination Cause T/C 1805 depressured for waterwash and maintenance.
Action Taken TIC 1805 depressurization completed.
13-185 Controlled Blowdown 04/20/2013 7:45:00 am 7:50:00 am 5 min No
Determination Cause TIC 1805 shut down after spin cool and depressured to 0
Action Taken T/C 1805 depressurization completed
No Yes BP1\GAMBHO 141
No Yes BP1\OVERTOD 51
13-185 Controlled Blowdown 04/20/2013 11:10:00 pm 11:15:00 pm 5 min No No Yes BPIIGAMBH0 51
Determination Cause T/C 1805 depressured after water wash.
Action Taken T/C 1805 depressurization completed.
Daily Volume (MSCF) 435
13-187 Controlled Blowdown 04/21/2013 1:06:00 am 1:11:OOam 5min No No Yes BP1\GAMBHO 141
Determination Cause T/C 1802 shut down for water wash and maintenance.
Action Taken T/C 1802 depressurization completed.
13-187 Controlled Blowdown 04/21/2013 3:08:00 am 3:13:OOam 5min No No Yes BP1\GAMBHO 51
Determination Cause T/C 1802 depressured after spin cool.
Action Taken T/C 1802 depressurization completed.
Daily Volume (MSCF) 192
13-193 Controlled Blowdown 04/22/2013 4:55:00 am 50000am 5min No No Yes BP1\BAKERWF 408
Generated 05/07/2013 9:39:06AM Page i of 12
Flare Start Date 04/01/2013
Flare End Date 04/30/2013
Determination Cause T\C 1876 shutdown due to a problem associated with CGF Tandem station shutdown.
Action Taken 1876 T/C depressurized and shut down.
13-193 Controlled Blowdovm 04/22/2013 6:00:00 am 6:10:00 am 10 min No No Yes BPI\GAMBHO 845
Determination Cause CGF tripped 4 tandems which caused front end pressure to spike. Opened P37 flare valve to lower front end pressure and prevent CGF from
flaring as requested by EOC.
Action Taken Front end depressurization complete.
13-193 Controlled Blowdovm 04/22/2013 6:13:00 am 6:16:00 am 3 min No No Yes BP1\GAMBHO 210
Determination Cause Opened P37 flare valve to drop front end pressure so CGF wouldn't flare as requested by EOC.
Action Taken Front end depressurization complete.
Total Volume (MSCF) 2807
Generated 05/07/2013 9:39:07AM Page 2 of 12
Daily Volume (MSCF)
1463
13-200 Controlled Blowdown 04/23/2013 12:12:00 am 12:17:00 am 5 min
No
No
Yes BP7\GAMBHO
135
Determination Cause T/C 1806 shut down for water wash and maintenance.
Action Taken TIC 1806 depressurization complete.
13-200 Controlled Blowdown 04/23/2013 2:35:00 am 2:40:00 am 5 min
No
No
Yes BP1\GAMBHO
51
Determination Cause T/C 1806 depiessured after spin cool from 140 psi to 0 psi.
Action Taken T/C 1806 depressurization complete.
Daily Volume (MSCF)
Ise
13-204 Controlled Blowdown 04/24/2013 2:56:00 am 3:01:00 am 5 min
No
No
Yes BP1\GAMBH0
135
Determination Cause T/C 1807 shut down for water wash and maintenance.
Action Taken TIC 1807 depressurization complete.
13-204 Controlled Blowdown 04/24/2013 5:30:00 am 5:35:00 am 5 min
No
No
Yes BP7\GAMBH0
51
Determination Cause T/C 1807 shut down after spin cool. Depressured from 140 psi to 0 psi.
Action Taken T/C 1807 depressurizaflon complete.
Dally Volume (MSCF)
186
Total Volume (MSCF) 2807
Generated 05/07/2013 9:39:07AM Page 2 of 12
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000000
2. Facility Name
PBU CCP/FFGU
3. Field
PBU - EOA
4. Operator
BP
5. Month year of Disposition
Ma -2013
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
1,128,941
Pool Name Pool Code Percent
7. Reinjected
189,884,715
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
2,790
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
35,300
11. Assist Gas
0
12. Fuel gas used in lease operations.
6,098,941
13. Other (see instructions)
591
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
197,151,278
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from: CGF & FS1
197,151,278
Commissioner Date
18. Transferred to: (Express as a negative #)
ni
19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar; Block 12: Includes COTP Non-PBU Fuel Gas = 3,763 mscf; Block 18:
Fuel Gas to LPC = 591 mscf
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
O�� Note: All volumes must be corrected
SignatureldrtC.I/� R (,lfLy _ Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and t0 a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000000
2. Facility Name
PBU CCP/FFGU
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
June -2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
1,083,392
Pool Name Pool Code Percent
7. Reinjected
167,485,498
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
857
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
34,034
11. Assist Gas
0
12. Fuel gas used in lease operations.
5,619,446
13. Other (see instructions)
Q
Official Use Only
Authorization>1 he
Safety
MCF
14, TOTAL VOLUME (ITEMS 6-12)
174,223,227
Lease Use
MCF
15. NGL Gas Equivalent
Q
Conservation
MCF
16. Purchased gas
Q
Waste:
MCF
17. Transferred from: CGF & FSI
174,223,227
18. Transferred to: (Express as a negative #)
Q
Commissioner Date
19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar; Block 12: Includes COTP Nan-PBU Fuel Gas = 1,875 mscf; Block 18:
Fuel Gas to LPC = 0 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
temperature of 600 F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date () 3 AAC25.235.
6
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000000
2. Facility Name
PBU CCP/FFGU
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
July -2013
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
1,021,961
Pool Name Pool Code Percent
7. Reinjected
178,497,603
PRUDHOE 640150 100.00%
6. Flared or vented 1 hour or less
3,073
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
34,942
11. Assist Gas
0
12. Fuel gas used in lease operations.
5,497,465
13. Other (see instructions)
D
Official Use Only
Authorization >l hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
185,055,044
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from: CGF & FSI
185,055,044
16. Transferred to: (Express as a negative #)
0
Commissioner Date
19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar; Block 12: Includes COTP Non-PBU Fuel Gas = 0 mscf; Block 18: Fuel
Gas to LPC = 0 Mscf
I hereby certify that a foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature wl'x Title Mana er Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
) r temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date /. 5 AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000000
2. Facility Name
PBCCP/FFGU
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
August -2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total volume.
6. Sold
1,086,619
Pool Name Pool Code Percent
7. Reinjected
168,088,095
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
869
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilotand Purge
34,971
11. Assist Gas
0
12. Fuel gas used in lease operations.
5,169,202
13. Other (see instructions)
7,360
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
174,387,116
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from: CGF 8 FS1
174,387,116
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar; Block 12: Includes COTP Non-PBU Fuel Gas = 0 mscf; Block 18: Fuel
Gas to LPC = 7,360 mscf
I hereby certify that foregoing is true and correct to the best of my knowledge.
/I Note: All volumes must be corrected
Signature I Title Mana er Production Taxes and Ro allies Alaska to pressure of 14.65 psis and to a
�(, temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date J A41791; 235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000000
2. Facility Name
IPBU CCP/FFGU
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
I September -2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume,
6. Sold
1,117,901
Pool Name Pool Code Percent
7. Reinjected
181,285,380
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
208
9. Flared or vented more than 1 hour (see insh.)
0
10. Pilot and Purge
33,942
11. Assist Gas
U
12. Fuel gas used in lease operations.
5,222,714
13. Other (see instructions)
U
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
187,660,145
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF & FS1
187,660,145
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar; Block 12: Includes COTP Non-PBU Fuel Gas = 0 mscf; Block 18: Fuel
Gas to LPC = 0 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature �� Title Mana Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date 603 AAC25.235,
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000000
2. Facility Name
PBU Cly
3. Field
PBU - EOA
4. Operator
BP
5. Month/Year of Disposition
October -2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
1,155,372
Pool Name Pool Code Percent
7. Reinjected
187,648,805
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
4,757
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
35,029
11. Assist Gas
0
12. Fuel gas used in lease operations.
5,915,725
13. Other (see instructions)
7,456
AuthorizationialUse Onlyzation >1 hr:
Safety
Lease Use
Conservation
MCF
14. TOTAL VOLUME (ITEMS 6-12)
194,767,144
MCF
15. NGL Gas Equivalent
0
MCF
16. Purchased gas
p
Waste:
MCF
17. Transferred from: CGF & FS1
194,767,144
18. Transferred to: (Express as a negative #)
0
Commissioner Date
19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar; Block 12: Includes COTP Non-PBU Fuel Gas = 1,404 mscf; Block 18: Fuel
Gas to LPC = 7,456 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
�Note: All volumes must be corrected
Signature_/��///11�1,,..,,"""""" t'''�- _ nom. _ _r� Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane COI a Phone (907) 564-5775 Date X AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number2.
0290000000
Facility Name
PBU CCPtFFGU
3. Field
PBU - EOA
4. Operator
BP
5. MonlhNear of Disposition
I November -2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
1,320,458
Pool Name Pool Code Percent
7. Reinjected
206,654,976
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
149
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
34,200
11. Assist Gas
0
12. Fuel gas used in lease operations.
5,872,154
13. Other (see instructions)
67
Official Only
Authorization >l hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
213,882,004
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
Q
Waste:
MCF
17. Transferred from: CGF & FSI
213,882,004
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19, Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar; Block 12: Includes COTP Non-PBU Fuel Gas = 2,979 mscf; Block 18:
Fuel Gas to LPC = 67 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signatu Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date Z 3 13 AAC25.235.
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number2.
0290000000
Facility Name
PBU CCP/FFGU
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
December -2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
1,458,907
Pool Name Pool Code Percent
7. Reinjected
226,731,814
PRUDHOE 640150 100.00%
8. Flared or vented l hour or less
1,550
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
35,600
11. Assist Gas
0
12. Fuel gas used in lease operations.
6,261,609
13. Other (see instructions)
7,728
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
234,497,208
Lease Use
MCF
15. NGL Gas Equivalent
Q
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF & FS1
234,497,208
18. Transferred to: (Express as a negative #)
Q
Commissioner Date
19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar; Block 12: Includes COTP Non-PBU Fuel Gas = 3,402 mscf; Block 18:
Fuel Gas to LPC = 7,728 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
I/�l/�y�/��/� Note: All volumes must be corrected
Signature cam Title Mana er Production Taxes a d 5oyalties Alaska to pressure of 14.65 Asia and to a
iv temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date I 1 AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate