Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPBU CCP/FFGU Gas DispositionState of Alaska AOGCC Gas Disposition Files Year: 2013 Facility: PBU CCP/FFGU Operator: BP EXPLORATION (ALASKA) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCPtFFGU 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition I January -2013 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 1,362,960 Pool Name Pool Code Percent 7. Reinjected 227,252,198 PRUDHOE 640150 100.007/.-- 00.00%8. 8.Flared or vented 1 hour or less 1,634 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 34,968 11. Assist Gas 0 12. Fuel gas used in lease operations. 6,453,777 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6.12) 235,105,537 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas DMCF Waste: 17. Transferred from: CGF & FS1 235,105,537 Commissioner Dale 18. Transferred to: (Express as a negative #) O 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar; Block 12: Includes COTP Non-PBU Fuel Gas = 4,715 mscf; Block 18: Fuel Gas to LPC = 0 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. ^^ Note: All volumes must be corrected Signature_ �/I Tale Mana Manager Production Taxes and Royalties Alaska t0 pressure Of 14.65 psia and to a Im 122b temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235. Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. Page 1 PRUDHOE BAY UNIT -CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT January 2013 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 1/21/2013 0400-0445 159 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr 1/31/2013 2139-2144 45 TOTAL 204 Unplanned Events greater than 1 hour DATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Accidental Gas Release See attachments TOTAL 0 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT&CAUSE ACTION TAKEN TO ELIMINATE CAUSE 1/17/2013 0735-0740 141 See attachments See attachments 1/17/2013 1240-1245 408 1/17/2013 1251-1256 408 1/27/2013 0140-0145 77 1/27/2013 0356-0401 8 1/27/2013 0512-0517 159 1/27/2013 0811-0816 93 1/27/2013 0852-0857 91 1/31/2013 2100-2105 45 TOTAL 1,430 Planned Events Exceeding 1 Hour OR a, 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT&CAUSE ACTION TAKENTO ELIMINATE CAUSE See attachments See attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 204 Unplanned Events> 1 Hour 0 Planned Events< 1 hour and not 1,430 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 34,968 Assist 0 TOTAL FLARED VOLUME 36,602 2/13/2013 3:46 PM Flare Start Date 01/01/2013 Flare End Date 01/31/2013 CCP Flare Report Total Volume(MSCF) 1634 Report Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 13-21 Controlled Blowdown 01/17/2013 7:3500 am 7:40.00 am 5 min No No Yes BP11KOSMBO 141 Determination Cause T\C 1813 shutdown for planned maintenance Action Taken 1813 T/C depressurized and shut down. 13-21 Controlled Blowdown 01/17/2013 12:40:00 pm 12:45:00 pm 5 min No Determination Cause TIC 1878 shutdown for unplanned maintenance Action Taken 1878 T/C depressurized and shut down. 13-21 Controlled Slowdown 01/17/2013 12:51:00 pm 12:56:00 pm 5 min No Determination Cause T\C 1876 shutdown for unplanned maintenance Action Taken 1876 TIC depressurized and shut down. No Yes BP7\KOSM80 408 No Yes BP1XKOSMBO 408 13-44 Controlled Slowdown 01/27/2013 1:40:00 am 1:45:00 am 5 min No No Determination Cause TIC 1812 Depressured from suction pressure to 50 PSI after leak testing was completed. Action Taken TIC 1812 Depressuring stopped at 50 PSI. 1344 Controlled Blowdown 01/27/2013 3:56:00am 4:01:00am 5min No No Yes BP7\TOWNER 8 Determination Cause T/C 1812 Depressured from 175 PSI to 50 PSI for restart. Action Taken TIC 1812 Depressured to 50 PSI and stopped. 13-44 Controlled Blowdown 01/27/2013 51200 am 517:00 am 5 min No No Yes BP1\TOWNER 159 Determination Cause TIC 1811 depressured for tubing replacement. Action Taken T/C 1811 depressured to Zero PSI. 1344 Controlled Slowdown 01/27/2013 8:11:00 am 8:16:00 am 5 min No No Yes BPI\GAMBHO 93 Determination Cause TIC 1811 Depressured from suction pressure to 0 when a problem was found during a leak test. Action Taken T/C 1811 depressurization completed. 1344 Controlled Blowdown 01/27/2013 8:52:00 am 8:57:00 am 5min No No Yes BP1\GAMBHO 91 Determination Cause T/C 1811 Depressured to 200 psi after leak test was completed. Action Taken T/C 1811 Depressured from suction pressure to 200 psi and stopped for start up. 13-49 Controlled Slowdown 01/31/2013 9:00:00 pm 9:05:00 pm 5 min No No Yes BP7\BAKERWF 45 Determination Cause -RC 1813 pressure testing to 500 psi then depressured. Action Taken 1813 T/C depressurization completed. Total Volume (MSCF) 1634 Generated 02/04/2013 3:54:59PM Page i of 10 McMains, Stephen E (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj Sent: Friday, February 01, 2013 8:29 AM To: McMains, Stephen E (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS CGF OTL; O'Riordan, Colm J; AK, HSSEE Env Adv East; AK, OPS CCP CGF OSM Subject: Gas flaring event at CGF v To: Steve McMains, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC steve.mcmainsCcDalaska.gov dave.robvaDalaska.gov victoria.ferguson(aalaska.gov From: Travis Rybicki, GPB Production Optimization Team Leader A flaring event occurred at CGF starting at 01/20/2013 16:23 and stopping at 01/20/2013 18:58 with a volume of 27237 (MSCF). The event lasted for 155 minutes and was due to the unplanned shutdown of the CGF T/C 1805 MI Compressor. Flaring continued while operations/maintenance performed troubleshooting. Flaring ended when the T/C 1805 unit was restarted, the unit was loaded, CGF process stabilized and flare valves closed. Please let me know if you have any questions. Travis M. Rybicki PCC-EOC (Production Optimization) Team Lead Office 907-659-4472 (BOC) 659-5566 (PBOC) Cell 907-748-2118 Harmony 758-4404 GPB Pager 907-659-5272 # 1890 akopspcceoctl@bp. Com Alternate: Kellie Okonek STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCPIFFGU 3. Field PBU - EOA 4. Operator I BP 5. MonthNear of Disposition February -2013 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 1,228,867 Pool Name Pool Code Percent 7. Reinjected 204,061,502 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 765 9. Flared or vented more than 1 hour (see insh.) 0 10. Pilot and Purge 31,965 11. Assist Gas 0 12. Fuel gas used in lease operations. 5,786,795 13. Other (see instructions) 1,005 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 211,110,899 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: CGF&FS1 211,110,899 Commissioner Date 18. Transferred to: (Express as a negative #) O 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar; Block 12: Includes COTP Non-PBU Fuel Gas = 7,226 mscf; Block 18: Fuel Gas to LPC = 1,005 mscf I hereby certify that th/e� foregoing iss true and correct to the best of my knowledge. Signature Note: All volumes must be corrected 6JllUl (1/ .(Ji%T! / I Title Mans er Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date , / AAC25.235. Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT February 2013 VOLUME TOTAL 0 Page t TOTAL Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr TOTAL 0 Planned Events <1 hour and not 765 Unplanned Events greater than Shour Planned Events> 1 hour or 0 DATE TIME DESCRIPTION OF INCIDENT&CAUSE ACTION TAKENTO ELIMINATE CAUSE Assist 0 Accidental Gas Release See attachments TOTAL 0 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 2/1/2013 1928-1933 45 See attachments See attachments 2/1/2013 2146-2151 45 2/3/2013 1523-1528 45 2/3/2013 1923-1928 14 2/13/2013 0450-0455 8 2/15/2013 1004-1009 141 2/15/2013 1120-1125 14 2/25/2013 1402-1407 45 2/26/2013 0902-0907 408 TOTAL 765 Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 Page t TOTAL Unplanned Events < 1 Hour 0 Unplanned Events> 1 Hour 0 Planned Events <1 hour and not 765 exceeding 5,000 MCF Planned Events> 1 hour or 0 exceeding 5,000 MCF Pilot Purge 31,965 Assist 0 31l3/2013 TOTAL FLARED VOLUME 32,730 9:52 AM AM McMains, Stephen E (DOA) From: Regg, James B (DOA) Sent: Tuesday, February 19, 2013 4:12 PM To: Ferguson, Victoria L (DOA); McMains, Stephen E (DOA) Subject: FW: Notification: Uncontrolled Gas Release - Skid 50 - Greater Prudhoe Bay FYI; typically these have been deemed waste by us in the past . Should be documented in their gas disposition report. Jim Regg AOGCC 333 W. 7th Ave, Suite 100 Anchorage, AK 99501 907-793-1236 From: AK, OPS PCC EOC TL [mailto:AKOPSPCCEOCTLCrilbp.com] Sent: Tuesday, February 19, 2013 3:49 PM To: Regg, James B (DOA) Cc: AK, OPS FS3 CSM; AK, OPS Campaign Maint OSM; Burgess, David H; AK, OPS FS3 Facility OTL Subject: Notification: Uncontrolled Gas Release - Skid 50 - Greater Prudhoe Bay Jim, I spoke to Bob Noble at the Deadhorse AOGCC Inspector office — 3:05pm today, shortly after my arrival back to North Slope to inform him of this event. Per his request and the brief voice mail I left you: At — 9am this morning BP was performing maintenance in the Skid 50 area on the NGL prover meter skid. An uncontrolled gas release (liquid NGL—with associated vaporization) occurred. Actual cause and volume are under investigation. The event is being managed as a Tier I incident. There were no injuries or fires associated with this event. We will follow up with the 5 & 30 day reports. Regards, Travis M. Rybicki PCC-EOC (Production Optimization) Team Lead Office 907-659-4472 (BOC) 659-5566 (PBOC) Cell 907-748-2118 Harmony 7584404 GPB Pager 907-659-5272 # 1890 a ko OS Pcceoctl (Oi bo. Com Alternate: Kellie Okonek STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODt1CFD GAS niSPnS1T1n1U 1. Facility Number 2. Facility Name 0290000000 PBU CCP/FFGU Disposition 3. Field PBU - EOA Volume MCF 4. Operator •5. MonthNear of Disposition BP March -2013 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume, 6. Sold 1,442,880 Pool Name PoolCode Percent 7. Reinjected 218,801,108 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 276 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 35,071 11. Assist Gas 0 12. Fuel gas used in lease operations. 6,356,532 13. Other (see instructions) 1,787 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 226,637,654 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: CGF & FS1 226,637,654 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar; Block 12: Includes COTP Non-PBU Fuel Gas = 8,283 mscf; Block 18: Fuel Gas to LPC = 1,787 mscf I hereby certify that regoingris true and correct to the best of my knowledge. Note: All volumes must be corrected Signature Title Manager Production Taxe2IQJLRo hies Alaska to pressure of 14.65 psis and to a ill ,0 //� temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date J AAC25.235. Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT- CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT March 2013 DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 3/18/2013 0920-0925 135 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr TOTAL 135 Unplanned Events greater than 1 hour DATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Accidental Gas Release See attachments TOTAL 0 DATE TIME VOLUME DESCRIPTION OF IN 3/30/2013 1650-1655 141 See attachments TOTAL 141 See attachments TOTAL 0 See attachments See attachments Page 1 4/10/2013 1:30 PM TOTAL Unplanned Events < 1 Hour 135 Unplanned Events> 1 Hour 0 Planned Events < 1 hour and not 141 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 35,071 Assist p TOTAL FLARED VOLUME 35,347 See attachments See attachments Page 1 4/10/2013 1:30 PM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCPIFFGU 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition A rill -2013 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total volume. 6. Sold 1,251,479 Pool Name Pool Code Percent 7. Reinjected 207,548,043 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 2,807 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 34,242 11. Assist Gas 0 12. Fuel gas used in lease operations. 6,062,644 13. Other (see instructions) 2,971 Official Use Only Authorization >1 hr. Safety MCF 14. TOTAL VOLUME (ITEMS 6.12) 214,902,186 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: CGF & FSI 214,902,186 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar; Block 12: Includes COTP Non-PBU Fuel Gas = 6,358 mscf; Block 16: Fuel Gas to LPC = 2,971 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature (� %�� Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date ,5 AAC25.235. Form 10422 Rev. W009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT- CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT April 2013 DATE TIME VOLUME DESCRIPTIONOF INCIDENT&CAUSE ACTIONTAKEN TO ELIMINATE CAUSE Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr TOTAL 0 Unplanned Events greater than 1 hour DATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Accidental Gas Release See attachments TOTAL 0 Planned Events Less Than or Eaual 1 Hour AND <= 5.000 mcf 4/19/2013 4/19/2013 4/19/2013 4/19/2013 4/19/2013 4/20/2013 4/20/2013 4/20/2013 4/20/2013 4/20/2013 4/21/2013 4/21/2013 4/22/2013 4/22/2013 4/22/2013 4/23/2013 4/23/2013 4/24/2013 4/24/2013 0018-0023 0223-0228 2215-2220 2243-2248 2254-2259 0021-0026 0228-0233 0515-0520 0745-0750 2310-2315 0106-0111 0308-0313 0455-0500 0600-0610 0613-0616 0012-0017 0235-0240 0256-0301 0530-0535 TOTAL 141 See attachments 51 51 51 51 141 51 141 51 51 141 51 408 845 210 135 51 135 51 2,807 See attachments Page 1 5/14/2013 10:22 AM BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT April 2013 See attachments TOTAL 0 ACTION TAKEN TO ELIMINATE See attachments Page 2 5/14/2013 10:22 AM TOTAL Unplanned Events < 1 Hour 0 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 2,807 exceeding 5,000 MCF Planned Events> 1 hour or 0 exceeding 5,000 MCF Pilot Purge 34,242 Assist 0 TOTAL FLARED VOLUME 37,049 ACTION TAKEN TO ELIMINATE See attachments Page 2 5/14/2013 10:22 AM Flare Start Date 04/01/2013 Flare End Date 04/30/2013 CCP Flare Report Total Volume (MSCF) 2807 Report Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 13-182 Controlled Blowdown 04/19/2013 12:18:00 am 12:23:00 am 5 min No No Yes BP7\GAMBHO 141 Determination Cause T/C 1808 shut down for water wash and planned maintenance. Action Taken T/C 1808 depressurization completed. 13-182 Controlled Blowdown 04/19/2013 2:23:00 am 2:28:00 am 5 min No No Yes BPl\GAMBHO 51 Determination Cause T/C 1808 depressured from 130 psi to 0 psi when spin cool was completed. Action Taken TIC 1808 depressurization completed. 13-182 Controlled Blowdown 04/19/2013 10:15:00 pm 10:20:00 pm 5 min No No Yes BP1\GAMBHO 51 Determination Cause T/C 1808 depressured after water wash for valve sequence. Action Taken TIC 1808 depressurization complete. 13-182 Controlled Blowdown 04/19/2013 10:43:00 pm 10:48:00 pm 5 min No No Yes BPl%GAMBHO 51 Determination Cause T/C 1808 valve sequence stopped because of pressure problem. Depressured to 0 psi. Action Taken T/C 1808 depressurization completed. 13-182 Controlled Blowdown 04/19/2013 10:54:00 pm 10:59:00 pm 5 min No No Yes 131`1\GAMBHO 51 Determination Cause T/C 1808 ESD'd because of noise during start up. Depressured to 0 psi. Action Taken TIC 1808 depressurtzation complete. Daily Volume (MSCF) 345 13-185 Controlled Blowdown 04/20/2013 12:21:00 am 12:28:00 am 5 min No No Yes BPI\GAMBHO 141 Determination Cause T/C 1804 shutdown for water wash. Depressured to 0 psi. Action Taken T/C 1804 depressurization completed. 13-185 Controlled Blowdown 04/20/2013 2:28:00 am 2:33:00 am 5 min No No Yes BP1\GAMBHO 51 Determination Cause T/C 1804 shutdown after spin cool and depressured from 135 psi to 0 psi. Action Taken T/C 1804 depressurization completed. 13-185 Controlled Blowdown 04/20/2013 5:15:00 am 5:20:00 am 5 min No Determination Cause T/C 1805 depressured for waterwash and maintenance. Action Taken TIC 1805 depressurization completed. 13-185 Controlled Blowdown 04/20/2013 7:45:00 am 7:50:00 am 5 min No Determination Cause TIC 1805 shut down after spin cool and depressured to 0 Action Taken T/C 1805 depressurization completed No Yes BP1\GAMBHO 141 No Yes BP1\OVERTOD 51 13-185 Controlled Blowdown 04/20/2013 11:10:00 pm 11:15:00 pm 5 min No No Yes BPIIGAMBH0 51 Determination Cause T/C 1805 depressured after water wash. Action Taken T/C 1805 depressurization completed. Daily Volume (MSCF) 435 13-187 Controlled Blowdown 04/21/2013 1:06:00 am 1:11:OOam 5min No No Yes BP1\GAMBHO 141 Determination Cause T/C 1802 shut down for water wash and maintenance. Action Taken T/C 1802 depressurization completed. 13-187 Controlled Blowdown 04/21/2013 3:08:00 am 3:13:OOam 5min No No Yes BP1\GAMBHO 51 Determination Cause T/C 1802 depressured after spin cool. Action Taken T/C 1802 depressurization completed. Daily Volume (MSCF) 192 13-193 Controlled Blowdown 04/22/2013 4:55:00 am 50000am 5min No No Yes BP1\BAKERWF 408 Generated 05/07/2013 9:39:06AM Page i of 12 Flare Start Date 04/01/2013 Flare End Date 04/30/2013 Determination Cause T\C 1876 shutdown due to a problem associated with CGF Tandem station shutdown. Action Taken 1876 T/C depressurized and shut down. 13-193 Controlled Blowdovm 04/22/2013 6:00:00 am 6:10:00 am 10 min No No Yes BPI\GAMBHO 845 Determination Cause CGF tripped 4 tandems which caused front end pressure to spike. Opened P37 flare valve to lower front end pressure and prevent CGF from flaring as requested by EOC. Action Taken Front end depressurization complete. 13-193 Controlled Blowdovm 04/22/2013 6:13:00 am 6:16:00 am 3 min No No Yes BP1\GAMBHO 210 Determination Cause Opened P37 flare valve to drop front end pressure so CGF wouldn't flare as requested by EOC. Action Taken Front end depressurization complete. Total Volume (MSCF) 2807 Generated 05/07/2013 9:39:07AM Page 2 of 12 Daily Volume (MSCF) 1463 13-200 Controlled Blowdown 04/23/2013 12:12:00 am 12:17:00 am 5 min No No Yes BP7\GAMBHO 135 Determination Cause T/C 1806 shut down for water wash and maintenance. Action Taken TIC 1806 depressurization complete. 13-200 Controlled Blowdown 04/23/2013 2:35:00 am 2:40:00 am 5 min No No Yes BP1\GAMBHO 51 Determination Cause T/C 1806 depiessured after spin cool from 140 psi to 0 psi. Action Taken T/C 1806 depressurization complete. Daily Volume (MSCF) Ise 13-204 Controlled Blowdown 04/24/2013 2:56:00 am 3:01:00 am 5 min No No Yes BP1\GAMBH0 135 Determination Cause T/C 1807 shut down for water wash and maintenance. Action Taken TIC 1807 depressurization complete. 13-204 Controlled Blowdown 04/24/2013 5:30:00 am 5:35:00 am 5 min No No Yes BP7\GAMBH0 51 Determination Cause T/C 1807 shut down after spin cool. Depressured from 140 psi to 0 psi. Action Taken T/C 1807 depressurizaflon complete. Dally Volume (MSCF) 186 Total Volume (MSCF) 2807 Generated 05/07/2013 9:39:07AM Page 2 of 12 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCP/FFGU 3. Field PBU - EOA 4. Operator BP 5. Month year of Disposition Ma -2013 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 1,128,941 Pool Name Pool Code Percent 7. Reinjected 189,884,715 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 2,790 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 35,300 11. Assist Gas 0 12. Fuel gas used in lease operations. 6,098,941 13. Other (see instructions) 591 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 197,151,278 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: CGF & FS1 197,151,278 Commissioner Date 18. Transferred to: (Express as a negative #) ni 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar; Block 12: Includes COTP Non-PBU Fuel Gas = 3,763 mscf; Block 18: Fuel Gas to LPC = 591 mscf 1 hereby certify that the foregoing is true and correct to the best of my knowledge. O�� Note: All volumes must be corrected SignatureldrtC.I/� R (,lfLy _ Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and t0 a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCP/FFGU 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition June -2013 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 1,083,392 Pool Name Pool Code Percent 7. Reinjected 167,485,498 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 857 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 34,034 11. Assist Gas 0 12. Fuel gas used in lease operations. 5,619,446 13. Other (see instructions) Q Official Use Only Authorization>1 he Safety MCF 14, TOTAL VOLUME (ITEMS 6-12) 174,223,227 Lease Use MCF 15. NGL Gas Equivalent Q Conservation MCF 16. Purchased gas Q Waste: MCF 17. Transferred from: CGF & FSI 174,223,227 18. Transferred to: (Express as a negative #) Q Commissioner Date 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar; Block 12: Includes COTP Nan-PBU Fuel Gas = 1,875 mscf; Block 18: Fuel Gas to LPC = 0 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a temperature of 600 F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date () 3 AAC25.235. 6 Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCP/FFGU 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition July -2013 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 1,021,961 Pool Name Pool Code Percent 7. Reinjected 178,497,603 PRUDHOE 640150 100.00% 6. Flared or vented 1 hour or less 3,073 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 34,942 11. Assist Gas 0 12. Fuel gas used in lease operations. 5,497,465 13. Other (see instructions) D Official Use Only Authorization >l hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6.12) 185,055,044 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: CGF & FSI 185,055,044 16. Transferred to: (Express as a negative #) 0 Commissioner Date 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar; Block 12: Includes COTP Non-PBU Fuel Gas = 0 mscf; Block 18: Fuel Gas to LPC = 0 Mscf I hereby certify that a foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature wl'x Title Mana er Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a ) r temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date /. 5 AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBCCP/FFGU 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition August -2013 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total volume. 6. Sold 1,086,619 Pool Name Pool Code Percent 7. Reinjected 168,088,095 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 869 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilotand Purge 34,971 11. Assist Gas 0 12. Fuel gas used in lease operations. 5,169,202 13. Other (see instructions) 7,360 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6.12) 174,387,116 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: CGF 8 FS1 174,387,116 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar; Block 12: Includes COTP Non-PBU Fuel Gas = 0 mscf; Block 18: Fuel Gas to LPC = 7,360 mscf I hereby certify that foregoing is true and correct to the best of my knowledge. /I Note: All volumes must be corrected Signature I Title Mana er Production Taxes and Ro allies Alaska to pressure of 14.65 psis and to a �(, temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date J A41791; 235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name IPBU CCP/FFGU 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition I September -2013 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume, 6. Sold 1,117,901 Pool Name Pool Code Percent 7. Reinjected 181,285,380 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 208 9. Flared or vented more than 1 hour (see insh.) 0 10. Pilot and Purge 33,942 11. Assist Gas U 12. Fuel gas used in lease operations. 5,222,714 13. Other (see instructions) U Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 187,660,145 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: CGF & FS1 187,660,145 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar; Block 12: Includes COTP Non-PBU Fuel Gas = 0 mscf; Block 18: Fuel Gas to LPC = 0 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature �� Title Mana Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date 603 AAC25.235, Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU Cly 3. Field PBU - EOA 4. Operator BP 5. Month/Year of Disposition October -2013 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 1,155,372 Pool Name Pool Code Percent 7. Reinjected 187,648,805 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 4,757 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 35,029 11. Assist Gas 0 12. Fuel gas used in lease operations. 5,915,725 13. Other (see instructions) 7,456 AuthorizationialUse Onlyzation >1 hr: Safety Lease Use Conservation MCF 14. TOTAL VOLUME (ITEMS 6-12) 194,767,144 MCF 15. NGL Gas Equivalent 0 MCF 16. Purchased gas p Waste: MCF 17. Transferred from: CGF & FS1 194,767,144 18. Transferred to: (Express as a negative #) 0 Commissioner Date 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar; Block 12: Includes COTP Non-PBU Fuel Gas = 1,404 mscf; Block 18: Fuel Gas to LPC = 7,456 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. �Note: All volumes must be corrected Signature_/��///11�1,,..,,"""""" t'''�- _ nom. _ _r� Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Diane COI a Phone (907) 564-5775 Date X AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number2. 0290000000 Facility Name PBU CCPtFFGU 3. Field PBU - EOA 4. Operator BP 5. MonlhNear of Disposition I November -2013 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 1,320,458 Pool Name Pool Code Percent 7. Reinjected 206,654,976 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 149 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 34,200 11. Assist Gas 0 12. Fuel gas used in lease operations. 5,872,154 13. Other (see instructions) 67 Official Only Authorization >l hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 213,882,004 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas Q Waste: MCF 17. Transferred from: CGF & FSI 213,882,004 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19, Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar; Block 12: Includes COTP Non-PBU Fuel Gas = 2,979 mscf; Block 18: Fuel Gas to LPC = 67 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signatu Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date Z 3 13 AAC25.235. Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number2. 0290000000 Facility Name PBU CCP/FFGU 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition December -2013 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 1,458,907 Pool Name Pool Code Percent 7. Reinjected 226,731,814 PRUDHOE 640150 100.00% 8. Flared or vented l hour or less 1,550 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 35,600 11. Assist Gas 0 12. Fuel gas used in lease operations. 6,261,609 13. Other (see instructions) 7,728 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 234,497,208 Lease Use MCF 15. NGL Gas Equivalent Q Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: CGF & FS1 234,497,208 18. Transferred to: (Express as a negative #) Q Commissioner Date 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar; Block 12: Includes COTP Non-PBU Fuel Gas = 3,402 mscf; Block 18: Fuel Gas to LPC = 7,728 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. I/�l/�y�/��/� Note: All volumes must be corrected Signature cam Title Mana er Production Taxes a d 5oyalties Alaska to pressure of 14.65 Asia and to a iv temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date I 1 AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate