HomeMy WebLinkAboutPBU FS 1 Gas DispositionState of Alaska AOGCC
Gas Disposition Files
Year: 2013
Facility: PBU FS 1
Operator: BP EXPLORATION (ALASKA)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRnni irrn rec n1cone1T1nK1
1. Facility Number 2. Facility Name
0290000028 PBU FS 1
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator 5. Month year of Disposition
BP January -2013
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7, Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
0
9, Flared or vented more than 1 hour (see instr.)
1,625
10. Pilot and Purge
27,118
11. Assist Gas
29,186
12. Fuel gas used in lease operations.
742,276
13. Other (see instructions)
0
Official Use Only
Authorization>1 h[
Safety
� � 2 �
MCF
14. TOTAL VOLUME (ITEMS 6-12)
$00,205
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
295,822
Commissioner Date
18. Transferred to: (Express as a negative #) CGF & CCP
-80,465,925
19. Remarks:
hereby certify that he foregoing is true and correct to the best of my knowledge.
��f IJf (x Note: All volumes must be corrected
Signature Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psia and to a
Printed Name Diane Colleytemperature of 60o F. Authority 20
Phone (907) 564-5775 Date AAC25.235,
Form 10-422 Rev, 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -1
GAS FLARING INCIDENT REPORT
January 2013
nned Events less than or
DATE TIME
Not required for unplanned events <= 1 hr
TOTAL 0
Not required for unplanned events <= 1 hr
jUnplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
1/14-15/2013 2200-0115 1,625 See attachments See attachments
TOTAL 1,625
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL 0
Planned Events Exceeding 1 Hour OR> 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCInFNT A CAI ICF ACTIAN TAVCM Tn n I nmu ATC rA ucc
See attachments
TOTAL 0
See attachments
Page 3
2/13/2013
3:46 PM
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events> 1 Hour
1,625
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
27,118
Assist
29,186
TOTAL FLARED VOLUME
57,929
See attachments
Page 3
2/13/2013
3:46 PM
FlareStartDate 01/01/2013
Flare End Date 01/31/2013
FS1 Flare Report Total Volume (MSCF) 1625
Report
Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
13-17 Flare Relief 01/14/2013 10:00:00 pm 12:00:00 am 120 min No No No BPt\TICHNEG 1000
Determination Cause 1802 T/C shutdown on GG high exhaust temperature.
Action Taken Changed out GG lube oil filters and attempted to start T/C, still flaring.
13-18 Flare Relief 01/15/2013 12:00:00 am 1:15:00 am 75 min No No No BP11TICHNEG 625
Determination Cause 1802 TIC shutdown on high GG exhaust temperature.
Action Taken Started 1802 TIC.
Total Volume (MSCF) 1625
Generated 02/04/2013 3:54:59PM Page 3 of 10
McMains, Stephen E (DOA
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent: Friday, February 01, 2013 8:17 AM
To: McMains, Stephen E (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, OPS FSI Facility OTL; Burgess, David H; AK, HSSEE Env Adv East; AK,
OPS FS1 F5
Subject: Gas flaring events at FS1
To: Steve McMains, AOGCC
Steve. mcmains(a)alaska.gov
CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
dave.robv aa)alaska.gov victoria.ferousonCa alaska.00v
From: Travis Rybicki, GPB Production Optimization Team Leader
A flaring event occurred at FS1 starting at 01/14/2013 22:00 and stopping at 01/14/2013 24:00 with a volume of 1000
(MSCF). The event lasted for 120 minutes and was due to the unplanned shutdown of the FS2 T/C 1802 STV/IP
Compressor on high GG (gas generator) exhaust temperature. Flaring continued while operations/maintenance
personnel changed the GG lube oil filters and attempted to restart the unit. Flaring continued into the following day.
A flaring event occurred at FSI starting at 01/15/2013 00:00 and stopping at 01115/2013 01:15 with a volume of 625
(MSCF). The event lasted for 75 minutes and was due to the unplanned shutdown of the FS2 T/C 1802 STV/IP
Compressor on high GG (gas generator) exhaust temperature. Flaring continued while operations/maintenance
personnel changed the GG lube oil filters and attempted to restart the unit. Flaring ended when the unit was restarted,
loaded and the flare valves closed.
Please let me know if you have any questions.
Travis M. Rybicki
PCC-EOC (Production Optimization) Team Lead
Office 907-659-4472 (BOC) 659-5566 (PBOC)
Cell 907-748-2118 Harmony 7584404
GPB Pager 907-659-5272 # 1890
akopspcceoctl(d,)bp. COM
Alternate: Kellie Okonek
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DIRW)RITinni
1. Facility Number
0290000028
2. Facility Name
PBU FS 1
3. Field
PBU - EOA
4. Operator ... •5.
BPFebrua
Month/Year of Disposition
-2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
U
10. Pilot and Purge
24,693
11. Assist Gas
41,740
12. Fuel gas used in lease operations.
740,038
13. Other (see instructions)
U
Official Use Only,
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
$06,471
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
U
Waste
MCF
17. Transferred from: CGF
271,447
Commissioner Date
18. Transferred to: (Express as a negative #) CGF & CCP
-71,125,613
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
I Note: All volumes must be corrected
Signature �� Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
3 Printed Name Diane Colley Phone (907) 564-5775 Date temperature of 60o F. Authority 20AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
DATE
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -1
GAS FLARING INCIDENT REPORT
February 2013
Not required for unplanned events <= 1 hr
Not required for unplanned events <= 1 hr
TOTAL 0
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments
TOTAL 0
CAUSE
See attachments
TOTAL 0
See attachments
TOTAL 0
See attachments
ACTION TAKEN TO I
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Page 3
3/13/2013
9:52 AM
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events> 1 Hour
0
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
24,693
Assist
41,740
TOTAL FLARED VOLUME
66,433
See attachments
ACTION TAKEN TO I
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Page 3
3/13/2013
9:52 AM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODl1CFn r.es nicpnQ1TinKi
--
1. Facility Number2. Facility Name
0290000028 PBU FS 1
Disposition
---- - -
3. Field
PBU - EOA
Volume MCF
--- -... r.V• VVlI IVIM
4. Operator 5. MonthNear of Disposition
BP I March -2013
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. ReinjectedO
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
3,624
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
25,955
11. Assist Gas
51,963
12. Fuel gas used in lease operations.
813,701
13. Other (see instructions)
0Of
efal Use Only
Authorization >7 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
895,243
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
289,257
Commissioner Date
18. Transferred to: (Express as a negative #) CGF & CCP
-77,153,385
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
�� �" { Note: All volumes must be corrected
Signature Title Manager Production Taxes and Ro allies Alaska to pressure of 14.65 psia and to a
)� Printed Name Diane Cole temperature of 60o F. Authority 20
Phone (907) 564-5775 Date / AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
3/9/2013
DATE
3/8/2013
1530-1600
TOTAL
TOTAL
1110-1145
TOTAL
TOTAL
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -1
GAS FLARING INCIDENT REPORT
March 2013
DESCRIPTION OF INCIDENT & CAUSE
188 Not required for unplanned events <= 1 hr
188
DESCRIPTION OF IN
See attachments
A
3,436 See attachments
3,436
C
TOTAL
188
0
3,436
0
25,955
51,963
81,542
See attachments
Not required for unplanned events <= 1 hr
ACTION TAKEN TO E
See attachments
See attachments
See attachments
Page 3
4/10/2013
1:30 PM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS nISPORITinN
1. Facility Number 2. Facility Name
0290000028 PBU FS 1
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator • 5. Month/Year of Disposition
BP April -2013
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
27,603
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
29,082
11. Assist Gas
66,404
12. Fuel gas used in lease operations.
759,972
13. Other (see instructions)
Official Use Only
Authorization>1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
883,061
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
284,232
Commissioner Date
18. Transferred to: (Express as a negative #) CGF & CCP
-72,843,221
19, Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature JON Title Marta er Production Taxes and Ro aloes Alaska to pressure of 14.65 psis and to a
C temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -1
GAS FLARING INCIDENT REPORT
April 2013
jUnplanned Events less than or equal to 1 hour I
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
4/22/2013
0504-0545
8,542 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
4/22/2013
0558-0645
9,792
4/22/2013
0850-0950
4,167
4/23/2013
1745-1825
4,528
4/27/2013
1147-1204
118
4/27/2013
1217-1250
229
4/30/2013
0223-0240
94
4/30/2013
0336-0400
133
TOTAL
27,603
See attachments
See attachments
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL 0
DATE TIME
VOLUME DESCRIPTION OF IN,
See attachments
TOTAL
0
TOTAL
Unplanned Events < 1 Hour
27,603
Unplanned Events> 1 Hour
0
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events> 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
29,082
Assist
66,404
TOTAL FLARED VOLUME
123,089
See attachments
Page 5
5/14/2013
10:22 AM
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent: Tuesday, April 30, 2013 12:37 PM
To: McMains, Stephen E (DOA); Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, OPS FSI Facility OTL; AK, OPS FSI OSM; AK, HSSEE Env Adv East;
Burgess, David H
Subject: Gas flaring events at FS1
To: Jennifer Hunt, AOGCC
iennifer.hunt(a alaska.00v
CC: Dave Roby, AOGCC
dave. robya-alaska.aov
From: Travis Rybicki, GPB Production Optimization Team Leader
CC: Victoria Ferguson, AOGCC
victoria ferouson(a)alaska.gov
A flaring event occurred at FS1 starting at 04/22/2013 05:04 and stopping at 04/22/2013 05:45 with a volume of 8542
(MSCF). The event lasted for 41 minutes and was due to the Tandem compressor system shutdown at CGF, resulting in
high gas transit line pressures. Flaring continued while rate was cut in the FS1 area. Flaring ended when transit gas
pressure was reduced and flare valves closed.
A flaring event occurred at FS1 starting at 04/22/2013 05:58 and stopping at 04/22/2013 06:45 with a volume of 9792
(MSCF). The event lasted for 47 minutes and was due to the Tandem compressor system shutdown at CGF, resulting in
high gas transit line pressures. Flaring continued while rate was cut in the FS1 area. Flaring ended when transit gas
pressure was reduced and flare valves closed.
A flaring event occurred at FSI starting at 04/22/2013 08:50 and stopping at 04/22/2013 09:50 with a volume of 4167
(MSCF). The event lasted for 60 minutes and was due to the Tandem compressor system shutdown at CGF, resulting in
high gas transit line pressures. Flaring continued while rate was cut in the FS1 area. Flaring ended when transit gas
pressure was reduced and flare valves closed.
A flaring event occurred at FS1 starting at 04/23/2013 17:45 and stopping at 04/23/2013 18:25 with a volume of 4528
(MSCF). The event lasted for 40 minutes and was due to the FS1 Annex separation system shutdown related to the
ongoing Tandem compressor system shutdown at CGF, resulting in high gas transit line pressures. Flaring continued
while the Annex system shutdown. Flaring ended when the Annex system completed depressuring and flare valves
closed.
Please let me know if you have any questions.
Travis M. Rybicki
PCC-EOC (Production Optimization) Team Lead
Office 907-6594472 (BOC) 659-5566 (PBOC)
Cell 907-748-2118 Harmony 7584404
GPB Pager 907-659-5272 # 1890
akomcceoctl(aft.com
Alternate: Kellie Okonek
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000028
2. Facility Name
PBU FS 1
3. Field
PB U - EOA
4. Operator
BP
5. Monthlyear of Disposition
Ma -2013
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
O
Pool Name Pool Code Percent
7. Reinjected
O
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
5,825
9. Flared or vented more than 1 hour (see instr.)
2,483
10. Pilot and Purge
32,704
11. Assist Gas
100,338
12. Fuel gas used in lease operations.
603,546
13. Other (see instructions)
O
Official Use Only
Authorization >1 hr:
Safety
o24,03
MCF
14. TOTAL VOLUME (ITEMS 6-12)
744,896
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
226,504
Commissioner
Date
18. Transferred to: (Express as a negative #) CGF &CCP
-54,170,234
19. Remarks:
I hereby certify that N foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature ba/Title Manager Production Taxes and Ro aloes Alaska to pressure of 14.65 psie and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date OW AAC25.235.
1'L-1�1
q/ 13/13
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -1
GAS FLARING INCIDENT REPORT
May 2013
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT&CAUSE ACTION TAKEN TO ELIMINATE CAUSE
5/3/2013 1045-1130 253 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
5/4/2013 0250-0300 225
TOTAL 478
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT& CAUSE ACTION TAKEN TO ELIMINATE CAUSE
5/2/2013 0740-1015 1,076 See attachments See attachments
5/3/2013 1700-1815 420
5/10/2013 2035-2358 987
TOTAL 2,483
Planned Events Less Than or Equal 1
Hour AND <= 5,000 mcf
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
5/4/2013
0235-0300
261 See attachments See attachments
5/4/2013
1530-1535
3
5/5/2013
0915-0920
3
5/5/2013
1730-1735
3
5/5/2013
2143-2217
423
5/13/2013
1330-1400
125
5/26/2013
1551.1600
755
5/26/2013
1611-1613
168
5/26/2013
1630-1631
83
5/26/2013
1711-1745
2,852
5/26/2013
2154-2202
671
TOTAL
5,347
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE . ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL 0
Page 4
6/13/2013
2:28 PM
TOTAL
Unplanned Events 11 Hour
478
Unplanned Events> 1 Hour
2,483
Planned Events <1 hour and not
5,347
exceeding 5,000 MCF
Planned Events> 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
32,704
Assist
100,338
TOTAL FLARED VOLUME
141,350
Page 4
6/13/2013
2:28 PM
Flare Start Date 05/01/2013
Flare End Date 05/31/2013
Determination Cause STV -IP T/C 1801 shutdown due to a problem associated with Z270V Solenoid on IP Discharge Vent valve F268AV
Action Taken Valve problem corrected by technicians and STV -IP T/C 1801 was started and loaded.
13-227 Flare Relief 05/03/2013 5:00:00 pm 6:15:00 pm 75 min No
Determination Cause STV -IP -RC 1801 shutdown due to a valve out of position.
Action Taken Restarted and loaded SN/IP T/C.
No No BP1\NORTON 420
13-228 Flare Relief 05/04/2013 3:30:00 pm 3:35:00 pm 5 min No No Yes BP1\DEITZBJ 3
Determination Cause STV-IPT\C 1801 shutdown due to swap to 1802 after repair
Action Taken Completed depressuring.
13-233 Controlled Slowdown 05/05/2013 9:15:00 am 9:20:00 am 5 min No No Yes BPI\DEITZBJ 3
Determination Cause STV -IP T\C 1802 shutdown due to a problem associated with speed controller
Action Taken Completed depressuring.
13-233 Controlled Blowdown 05/05/2013 5:30:00 pm 5:35:00 pm 5 min No
FS1 Flare Report
Yes
BPI\DEITZBJ
3
Determination Cause STV -IP -RC 1801 shutdown due to a problem associated with 1802 repaired and put online
Total Volume (MSCF)
8308
Report
Action Taken Completed depressuring.
06/10/2013 9:22:50AM
Numbe
System Date Start Time Stop Time Duration Intermittent
Black Smoke Planned Reported By
Volume
13-220
Flare Relief 05/02/2013 7:40:00 am 10:15:OOam 155min Yes
No No BP1\GONZALF
1076
Determination Cause STV -IP T/C 1801 shutdown due to a problem associated with Z270V Solenoid on IP Discharge Vent valve F268AV
Action Taken Valve problem corrected by technicians and STV -IP T/C 1801 was started and loaded.
13-227 Flare Relief 05/03/2013 5:00:00 pm 6:15:00 pm 75 min No
Determination Cause STV -IP -RC 1801 shutdown due to a valve out of position.
Action Taken Restarted and loaded SN/IP T/C.
No No BP1\NORTON 420
13-228 Flare Relief 05/04/2013 3:30:00 pm 3:35:00 pm 5 min No No Yes BP1\DEITZBJ 3
Determination Cause STV-IPT\C 1801 shutdown due to swap to 1802 after repair
Action Taken Completed depressuring.
13-233 Controlled Slowdown 05/05/2013 9:15:00 am 9:20:00 am 5 min No No Yes BPI\DEITZBJ 3
Determination Cause STV -IP T\C 1802 shutdown due to a problem associated with speed controller
Action Taken Completed depressuring.
13-233 Controlled Blowdown 05/05/2013 5:30:00 pm 5:35:00 pm 5 min No
No
Yes
BPI\DEITZBJ
3
Determination Cause STV -IP -RC 1801 shutdown due to a problem associated with 1802 repaired and put online
Yes
Yes
BP1\WAKEMJP 755
Action Taken Completed depressuring.
06/10/2013 9:22:50AM
13-233 Controlled Blowdown 05/05/2013 9:43:00 pm 10:17:00 pm 34 min No
No
Yes
BP1\DEITZBJ
423
Determination Cause C train shutdown for planned maintenance
Action Taken Completed depressuring.
13-243 Flare Relief 05/10/2013 8:35:00 pm 11:58:00 pm 203 min No
No
No
BP1\DEITZBJ
987
Determination Cause STV -IP T\C 1802 shutdown due to a problem associated with oil pressure
Action Taken Loaded STV/IP T/C.
13-254 Flare Relief 05/13/2013 1:30:00 pm 2:00:00 pm 30 min No
No
Yes
BP1\DEITZBJ
125
Determination Cause STV -IP -RC 1802 unloaded due to low gas rates.
Action Taken Loaded STV/IP T/C and increased NGLs
13-278
Flare Relief 05/26/2013
3:51:00 pm
4:00:00 pm
9 min
No
Yes
Yes
BP1\WAKEMJP 755
Generated
06/10/2013 9:22:50AM
Page 6 of 14
Flare Start Date 05/01/2013
Flare End Date 05/31/2013
Determination Cause 1083 TIC Water Wash- starting gas crank sequence.
Action Taken Aborted the Water Wash.
13-278 Flare Relief 05/26/2013 4:11:00 pm 4:13:00 pm 2 min No
Yes
Yes
BPI\WAKEMJP
168
Determination Cause Attempted crank sequence for Water Wash to investigate Flare issues.
Action Taken Aborted the crank sequence.
13-278 Flare Relief 05/26/2013 4:30:00 pm 4:31:00 pm 1 min No
Yes
Yes
BP1\WAKEMJP
83
Determination Cause Attempted crank sequence for Water Wash to investigate flare issue.
Action Taken Aborted crank sequence.
13-278 Flare Relief 05/26/2013 5:11:00 pm 5:45:00 pm 34 min No
No
Yes
BP11WAKEMJP
2852
Determination Cause 1803 T/C Water Wash
Action Taken Completed Water Wash and stopped crank sequence.
13-278 Flare Relief 05/26/2013 9:54:00 pm 10:02:00 pm 8 min No
No
Yes
BPI\WAKEMJP
671
Determination Cause Start sequence on 1803 T/C.
Action Taken Successful start on 1903 T/C.
Total Volume (MSCF) 8308
Generated 06/10/2013 9:22:50AM Page 7 of 14
Hunt, Jennifer L (DOA)
From:
AK, OPS PCC EOC TL (AKOPSPCCEOCTL@bp.com]
Sent:
Monday, May 06, 2013 7:59 AM
To:
Hunt, Jennifer L (DOA)
Cc:
Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; Kruger, Dale O; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; AK,
HSSEE Env Adv West; AK, OPS FSI Facility OTL; AK, OPS FS1 OSM; Burgess, David H;
AK, HSSEE Env Adv East
Subject:
Gas flaring events at GC1 and FS1
To: Jennifer Hunt, AOGCC
]ennifer.hunt@alaska.gov
CC: Dave Roby, AOGCC
dave.robv@alaska.gov
From: Kellie Okonek, GPB Production Optimization Team Leader
CC: Victoria Ferguson, AOGCC
victoria.ferguson@alaska.¢ov
An intermittent flaring event has been ongoing at GCI due to valve leakage into the flare system, for which
operations continues to investigate the source of leaks:
at GC1 starting at 05/05/2013 00:00 and stopping at 05/05/2013 19:55 with a volume of 6820 (MSCF). The
event lasted for 1195 minutes. The event had a volume greater than 5000 (MSCF).
at GCI starting at 05/04/2013 00:00 and stopping at 05/05/2013 with a volume of 6120 (MSCF). The event
lasted for 1440 minutes. The event had a volume greater than 5000 (MSCF).
at GC1 starting at 05/03/2013 00:00 and stopping at 05/03/2013 23:52 with a volume of 6040 (MSCF). The
event lasted for 1432 minutes. The event had a volume greater than 5000 (MSCF).
A flaring event occurred at GCI starting at 05/05/2013 02:00 and stopping at 05/05/2013 06:00 with a volume
of 5080 (MSCF). The event lasted for 240 minutes. The event had a volume greater than 5000 (MSCF) and was
due to depressuring E-45 from E -pad for planned maintenance. Flaring stopped when line depressured.
A flaring event occurred at FSI starting at 05/03/2013 17:00 and stopping at 05/03/2013 18:15 with a volume
of 420 (MSCF). The event lasted for 75 minutes and was due to T/C 1801 shutdown due to valve issues.
Flaring stopped when the machine was restarted and loaded.
Please let me know if you have any questions.
Thanks,
Kellie Okonek (alt. Travis Rybicki)
PCCIEOC Production Optimization TL
external: (907) 659 4472 (BOC) 15566 (PBOC)
cell: (907) 382 1370 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akopspcceoctl(d,)bp.com
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent: Friday, May 03, 2013 4:09 PM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; Kruger, Dale O; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; AK,
HSSEE Env Adv West; AK, OPS FS1 Facility OTL; AK, OPS FS1 OSM; Burgess, David H;
AK, HSSEE Env Adv East
Subject: Gas flaring events at GC1 and FS1
To: Jennifer Hunt, AOGCC
iennifer. hu ntna.alaska.gov
CC: Dave Roby, AOGCC
dave. roby(cDalaska.gov
From: Kellie Okonek, GPB Production Optimization Team Leader
CC: Victoria Ferguson, AOGCC
victoria.fernuson(a)alaska.gov
An intermittent flaring event has been ongoing at GC1 due to valve leakage into the flare system, for which operations
continues to investigate the source of leaks:
at GC1 starting at 05/02/2013 00:00 and stopping at 05/03/2013 with a volume of 4640 (MSCF). The event lasted for 1440
minutes.
at GC1 starting at 05/01/2013 00:00 and stopping at 05/02/2013 with a volume of 7120 (MSCF). The event lasted for 1440
minutes. The event had a volume greater than 5000 (MSCF)
at GC1 starting at 04/30/2013 00:00 and stopping at 05/01/2013 with a volume of 8265 (MSCF). The event lasted for 1440
minutes. The event had a volume greater than 5000 (MSCF).
A flaring event occurred at FS1 starting at 05/02/2013 07:40 and stopping at 05/02/2013 10:15 with a volume of 1076
(MSCF). The event lasted for 155 minutes and was due to STV/IP compressor s/d due to a solenoid issue on the IP
discharge. Flaring stopped when the problem was fixed and the compressor started and re -loaded.
Please let me know if you have any questions.
Thanks,
Kellie Okonek (alt. Travis Rybicki)
PCC/EOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 382 1370 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akopspcceoctl(a)bp.com
Hunt, Jennifer L (DOA
From: AK, OPS PCC ECC TL [AKOPSPCCEOCTL@bp.comj
Sent: Tuesday, May 14, 2013 1:35 PM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; Kruger, Dale O; AK, HSSEE Env Adv West; AK, OPS FSI Facility OTL; AK,
OPS FS1 CSM; Burgess, David H; AK, HSSEE Env Adv East; AK, OPS FS3 OSM; AK, OPS
FS3 Facility OTL
Subject: Gas flaring events at GC3, FS3, and FS1
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
iennifer.hunt@alaska.aov dave.roby@alaska.gov victoria.ferauson@alaska.sov
From: Kellie Okonek, GPB Production Optimization Team Leader
A flaring event occurred at FSI starting at 05/10/2013 20:35 and stopping at 05/10/2013 23:58 with a volume
of 987 (MSCF). The event lasted for 203 minutes and was due to shutdown of 1802 T/C due to a problem
associated with oil pressure. Flaring stopped when the compressor was re -loaded.
A flaring event occurred at FS3 starting at 05/11/2013 13:02 and stopping at 05/11/2013 14:36 with a volume
of 70 (MSCF). The event lasted for 94 minutes.
at FS3 starting at 05/11/2013 01:05 and stopping at 05/11/2013 03:00 with a volume of 40 (MSCF). The event
lasted for 115 minutes and was due to spin cooling of 1803 LPS compressor for water wash. Flaring stopped
when cooling complete.
A flaring event occurred at FS3 starting at 05/13/2013 01:15 and stopping at 05/13/2013 03:15 with a volume
of 40 (MSCF). The event lasted for 120 minutes and was due to spin cooling of 1804 LPS compressor for water
wash. Flaring stopped when cooling complete.
A flaring event occurred at GC3 starting at 05/11/2013 03:00 and stopping at 05/11/2013 18:30 with a volume
of 16146 (MSCF). The event lasted for 930 minutes. The event had a volume greater than 5000 (MSCF) and
was due to depressurization of the GHX line for planned pigging activities. Flaring stopped when the line was
depressured.
Please let me know if you have any questions.
Thanks,
Kellie Okonek (alt. Travis Rybicki)
PCC/EOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 382 1370 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akopspcceoctl(d_)bp.com
Hunt, Jennifer L (DOA
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent: Thursday, May 30, 2013 10:39 AM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, OPS FS3 OSM; AK, HSSEE Env Adv East; Burgess, David H; AK, OPS
FS3 Facility OTL; AK, OPS FS1 OSM; AK, OPS FS1 Facility OTL; AK, OPS CGF OTL; AK,
OPS CCP CGF OSM; AK, OPS GC1 OSM; AK, OPS GCI Facility OTL; Kruger, Dale O; AK,
HSSEE Env Adv West
Subject: Gas flaring event at0 FS3, CGF, GC1
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
Jennifer hunt(a alaska.aov dave.roby alaska.gov
victoria ferguson(a alaska.gov
From: Kellie Okonek, GPB Production Optimization Team Leader
A flaring event occurred at GC1 starting at 05/30/2013 00:40 and stopping at 05/30/2013 05:40 with a volume of 2760
(MSCF). The event lasted for 300 minutes and was due to use of the copus F/G to cool down the economizer for
inspection on the LPS compressor.
A flaring event occurred at GC1 starting at 05/25/2013 14:07 and stopping at 05/25/2013 14:19 with a volume of 600
(MSCF). The event was a black smoke event and was due to LP/IP compressor s/d for workon the emergency generator
breaker.
A flaring event occurred at GC1 starting at 05/24/2013 00:00 and stopping at 05/25/2013 with a volume of 250 (MSCF).
The event lasted for 1440 minutes and was due to valves leaking into the flare system.
A flaring event occurred at GC1 starting at 05/23/2013 00:00 and stopping at 05/24/2013 with a volume of 250 (MSCF).
The event lasted for 1440 minutes and was due to valves leaking into the flare system.
A flaring event occurred at GC1 starting at 05/22/2013 16:45 and stopping at 05/23/2013 with a volume of 320 (MSCF).
The event lasted for 435 minutes and was due to the skid50 valve closure which shut down the GC1 shipping pumps.
Flaring occurred to maintain compressor operation, and stopped when flow rates were re-established to the GC.
A flaring event occurred at CGF starting at 05/29/2013 15:35 and stopping at 05/29/2013 17:00 with a volume of 16847
(MSCF). The event lasted for 85 minutes. The event had a volume greater than 5000 (MSCF) and was due to shutdown
of 1805 T/C due to PCU glitch.
A flaring event occurred at CGF starting at 05/29/2013 08:40 and stopping at 05/29/2013 11:00 with a volume of 16847
(MSCF). The event lasted for 140 minutes. The event had a volume greater than 5000 (MSCF) and was due to a
shutdown of 1855 T/C — flaring occurred while operations/maintenance worked to get the machine back online.
A flaring event occurred at FS3 starting at 05/29/2013 01:45 and stopping at 05/29/2013 03:55 with a volume of 875
(MSCF). The event lasted for 130 minutes and was due to 1806 T/C cooldown for planned maintenance. Flaring stopped
when cooldown was completed.
A flaring event occurred at FS1 starting at 05/26/2013 16:30 and stopping at 05/26/2013 16:31 with a volume of 83
(MSCF). The event was a black smoke event. Another event occurred at FS1 starting at 05/26/2013 16:11 and stopping
at 05/26/2013 16:13 with a volume of 168 (MSCF). The event was a black smoke event. A third event occurred at FS1
starting at 05/26/2013 15:51 and stopping at 05/26/2013 16:00 with a volume of 755 (MSCF). The event was a black
smoke event. These events were all related to the 1803 T/C water wash gas crank sequence, including attempts at the
crank sequence to investigate flare issues.
Please let me know if you have any questions.
Kellie Okonek (alt. Travis Rybicki)
PCC/EOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 382 1370 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akoosocceoctl(&bo.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000028
2. Facility Name
PBU FS 1
3. Field
PBU - EOA
4. Operator
BP
5. MonlhNear of Disposition
I June -2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
Q
PRUDHOE 640150 100.00%
8. Flared or vented l hour or less
1,389
9. Flared or vented more than 1 hour (see instr.)
29,850
10. Pilot and Purge
30,769
11. Assist Gas
52,130
12. Fuel gas used in lease operations.
678,678
13. Other (see instructions)
Q
Official Use Only
Authorization >1 hr:
Safety
ll
MCF
14. TOTAL VOLUME (ITEMS 6-12)
792,816
Lease Use
MCF
15. NGL Gas Equivalent
Q
Conservation
MCF
16. Purchased gas
p
Waste:
MCF
17. Transferred from: CGF
246772
/ _ / LL
(,( T
18. Transferred to: (Express as a negative #) CGF &CCP
-64,564,661
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knov4edge.
Signature Title Mana er Production Taxes and Royalties Alaska
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 600 F. Authority 20
AAC25.235.
<b
Printed Name Diane Cole Phone (907) 564-5775 Date f
11L -F -
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -1
GAS FLARING INCIDENT REPORT
June 2013
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
6/17/2013 0255-0315 1,389 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 1,389
DATE
TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
6/1/2013
1330-1600
834
See attachments
See attachments
6/10/2013
1849-1959
5,833
6/14/2013
1015-1145
21,875
6/14/2013
1230-1400
350
6/27/2013
2035-2300
604
6/28/2013
0001-0126
354
TOTAL
29,850
Planned Events Less Than or Equal 1
Hour AND <= 5,000 mcf
DATE
TIME
VOLUME
DESCRIPTION OF INCIDENT&CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
TOTAL
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
0
TOTAL
1,389
29,850
0
Ir
30,769
52,130
114,138
DESCRIPTION OF IN,
See attachments
See attachments
Page 3
7/16/2013
11:26 AM
Flare StartDate 06/01/2013
Flare End Date 06/30/2013
FS1 Flare Report
Total Volume (MSCF) 31239
Report
Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
13-288 Flare Relief 08/01/2013 1:30:00 pm 4:00:00 pm 150 min No No No BP1\LYLEPE 834
Determination Cause STV -IP TIC 1802 shutdown due to a problem associated with fuel gas KO drum high level.
Action Taken Loaded STV/IP T/C.
13-311 Flare Relief 06/10/2013 6:49:00 pm 7:59:00 pm 70 min No Yes No BPI\DEITZBJ 5833
Determination Cause LPS RC shutdown because of a problem associated with Vibration hi shutdown
Action Taken Shut in wells, 1803 restarted
13-322 Controlled Blowdown 06/14/2013 10:15:00 am 11:45:00 am 90 min No No No BP1\BARRERS 21875
Determination Cause High ambient temperature swings resulted in Flaring and required cuts in production. Ambient temperature increased very rapidly, and CGF
lost load on T/C.
Action Taken Shut in wells, reduced flare volume and CGF reloaded theircompressor.
13-322 Controlled Blowdown 06/14/2013 12:30:00 pm 2:00:00 pm 90 min Yes No
Determination Cause STV -IP T\C 1802 shutdown due to a problem associated with high discharge temp.
Action Taken Restarteed compressor
aken
13-335 Flare Relief 06/27/2013 8:35:00 pm 11:00:00 pm 145 min No
Determination Cause STV -IP TIC 1802 unloaded due to temperature.
Action Taken Loaded 1801 STV/IP T/C.
13-336 Flare Relief 06/28/2013 12:01:00 am 1:26:00 am 85 min No
Determination Cause STV -IP T\C 1801 unloaded due to temperature.
Action Taken Loaded 1802 STV/IP T/C.
No BP1\BARRERS 350
No No BP1\DEITZBJ 604
No No BPI\DEITZBJ 354
Total Volume (MSCF) 31239
Generated 07/09/2013 4:10:03PM Page 4 of 10
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj
Sent: Saturday, June 08, 2013 3:17 PM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, HSSEE Env Adv East; Burgess, David H; AK, OPS CGF OTL; AK, OPS
CCP CGF OSM; AK, OPS GC1 Facility OTL; O'Riordan, Colm J; AK, OPS PCC EOC TL; AK,
OPS GCI OSM; AK, OPS FS2 OSM; AK, OPS FS2 Facility OTL; AK, HSSEE Env Adv West;
AK, HSSEE Env Adv Central; AK, OPS GC3&PCC OSM, AK, OPS GC3 Facility & Field OTL;
AK, OPS FSI OSM; AK, OPS FS1 Facility OTL
Subject: Gas flaring events at FS2, CGF, GC1, GC3,
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
Jennifer hunt(a7alaska.gov dave roby(a)alaska.aov victoria ferguson(Oialaska gov
From: Kellie Okonek, GPB Production Optimization Team Leader
A flaring event occurred at FS2 starting at 06/07/2013 07:00 and stopping at 06/07/2013 12:00 with a volume of 5545
(MSCF). The event lasted for 300 minutes. The event had a volume greater than 5000 (MSCF) and was due to
depressurization of the plant for a planned B -train isolation. Flaring stopped when depressurization was complete.
A flaring event occurred at CGF starting at 06/07/2013 10:52 and stopping at 06/07/2013 14:10 with a volume of 11518
(MSCF). The event lasted for 198minutes.
ed when t event had a volume oublesh oting was complete han and 500he Ocomp essoa as as due to re- re -loaded and 5 MI
stopped
compressor shutdown. Flaring stopp
facility operations stabilized.
A flaring event occurred at CGF starting at 06/02/2013 18:32 and stopping at 06/02/2013 20:10 with a volume of 12410
(MSCF). The event lasted for 98 minutes. The event had a volume greater than 5000 (MSCF), and was due to when the card was replaced and
of T/C 1805 for planned maintenance to replace a failed vibration card. Flaring stopped
the T/C returned to service.
ood to
t of an
Previous
indicators showed 0 psighfor�the day aare now ndtthe therefore er support that noflaring occurred.rect meter. The
at GC1 starting at 05/13/2013 00:00 and stopping at 05/14/2013 with a volume of 0 (MSCF). The event lasted for 1440
minutes.
at GC1 starting at 05/12/2013 00:00 and stopping at 05/13/2013 with a volume of 0 (MSCF). The event lasted for 1440
minutes.
at GC1 starting at 05/11/2013 00:00 and stopping at 05/12/2013 with a volume of 0 (MSCF). The event lasted for 1440
minutes.
at GCI starting at 05/10/2013 00:00 and stopping at 05/11/2013 with a volume of 0 (MSCF). The event lasted for 1440
minutes.
at GC1 starting at 05/10/2013 00:00 and stopping at 05/11/2013 with a volume of 0 (MSCF). The event lasted for 1440
minutes.
at GCI starting at 05/09/2013 00:00 and stopping at 05/10/2013 with a volume of 0 (MSCF). The event lasted for 1440
minutes.
at GC1 starting at 05/08/2013 00:01 and stopping at 05/09/2013 with a volume of 0 (MSCF). The event lasted for 1439
minutes.
A flaring event occurred at GC3 starting at 06/07/2013 00:05 and stopping at 06/07/2013 09:00 with a volume of 2000
(MSCF). The event lasted for 535 minutes and was due to depressurization of the plant for planned TAR. Flaring stopped
when depressurization complete.
A flaring event occurred at FS1 starting at 06/01/2013 13:30 and stopping at 06/01/2013 16:00 with a volume of 834
(MSCF). The event lasted for 150 minutes and was due to shutdown of STV/IP 1802 compressor due to fuel gas knockout
drum high level. Flaring stopped when the compressor was re -loaded.
Please let me know if you have any questions.
Kellie Okonek (alt. Travis Rybicki)
PCCIEOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 382 1370 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akopspcceocti c bp.com
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent: Sunday, June 23, 2013 6:50 PM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; Burgess, David H; AK, OPS FSI Facility OTL; AK, OPS FS1 OSM; AK,
HSSEE Env Adv East
Subject: Gas flaring events at FS1
To: Jennifer Hunt, AOGCC
jennifer.hunt gnalaska.gov
CC: Dave Roby, AOGCC
dave. roby(o)alas ka. gov
From: Travis Rybicki, GPB Production Optimization Team Leader
CC: Victoria Ferguson, AOGCC
victoria. ferguson (c alaskaZov
A flaring event occurred at FS1 starting at 06/10/2013 18:49 and stopping at 06/10/2013 19:59 with a volume of 5833
(MSCF). The event lasted for 70 minutes. Flaring was due low to the unplanned shutdown of LPS T/C 1803. Flaring
continued while rate was cut. T/C 1803 was restarted. Flaring ended when T/C 1803 was restarted, loaded and flare
valves closed.
A flaring event occurred at FS1 starting at 06/14/2013 10:15 and stopping at 06/14/2013 11:45 with a volume of 21875
(MSCF). The event lasted for 90 minutes. Flaring was due to high gas transit line pressure at FS1 resulting from a
compressor shutdown at CGF. Flaring continued, rate was cut in FS1 area to reduce flare volume, while unit at CGF was
restarted and transit gas pressure returned to normal operating range, at which time flare valves closed.
A flaring event occurred at FS1 starting at 06/14/2013 12:30 and stopping at 06/14/2013 14:00 with a volume of 350
(MSCF). The intermittent event lasted for 90 minutes. Flaring was due to unplanned shutdown of STV/IP T/C 1802 due to
high discharge temperature. Flaring continued while T/C 1802 was restarted. Flaring ended when T/C 1802 was
restarted. loaded and flare valves closed.
Please let me know if you have any questions.
Travis M. Rybicki
PCC-EOC (Production Optimization) Team Lead
Office 907-6594472 (BOC) 659-5566 (PBOC)
Cell 907-748-2118 Harmony 7584404
GPB Pager 907-659-5272 # 1890
a kops pcceoctl (W b p. com
Alternate: Kellie Okonek
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent: Sunday, July 07, 2013 6:18 PM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, HSSEE Env Adv East; Burgess, David H; AK, OPS GC1 Facility OTL;
AK, OPS GC1 OSM; AK, OPS FS2 OSM; AK, OPS FS2 Facility OTL; AK, HSSEE Env Adv
West; AK, OPS GC3&PCC OSM; AK, OPS GC3 Facility & Field OTL; AK, OPS FS1 OSM;
AK, OPS FS1 Facility OTL; Kruger, Dale O
Subject: Gas flaring events at GCI, GC3, FS1, FS2
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
iennifer.hunt(a)alaska.gov dave.roby(a)alaska.gov victoria.ferguson(?a alaska.gov
From: Kellie Okonek, GPB Production Optimization Team Leader
A flaring event occurred at GC1 starting at 06/28/2013 16:30 and stopping at 06/28/2013 18:15 with a volume of 390
(MSCF). The event lasted for 105 minutes and was due to depressurization of spare GLT compressor when EOA Big AL
was loaded. Flaring stopped when depressurization was complete.
A flaring event occurred at GC1 starting at 06/29/2013 17:57 and stopping at 06/29/2013 19:10 with a volume of 10
(MSCF). The event lasted for 73 minutes and was due to start-up test for K-7000 and spin of coppus for cool down.
A flaring event occurred at GC1 starting at 07/05/2013 00:00 and stopping at 07/06/2013 with a volume of 40 (MSCF).
The event lasted for 1440 minutes and was due to flaring during GLT K3300 startup. Flaring stopped when startup
complete.
A flaring event occurred at GC3 starting at 06/29/2013 19:09 and stopping at 06/29/2013 20:10 with a volume of 551
(MSCF). The event lasted for 61 minutes and was due to LPS compressor s/d due to thermocouple deviations and V4
recycle valve I/P failure. Flaring stopped when production was curtailed and compressor re -loaded after repairs complete.
A flaring event occurred at FS1 starting at 06/27/2013 20:35 and stopping at 06/27/2013 23:00 with a volume of 604
(MSCF). The event lasted for 145 minutes and was due to unloading of the 1802 STV/IP compressor due to high ambient
temps. Flaring stopped when the alternate 1801 compressor was loaded.
A flaring event occurred at FS1 starting at 06/28/2013 00:01 and stopping at 06/28/2013 01:26 with a volume of 354
(MSCF). The event lasted for 85 minutes and was due to unloading of the 1801 STV/IP compressor due to high ambient
temps. Flaring stopped when the alternate 1802 compressor was loaded..
A flaring event occurred at FS1 starting at 07/01/2013 16:35 and stopping at 07/01/2013 20:20 with a volume of 851
(MSCF). The event lasted for 225 minutes and was due to depressurization of DS12 for planned maintenance. Flaring
stopped when depressure complete.
A flaring event occurred at FS1 starting at 07/07/2013 09:50 and stopping at 07/07/2013 11:30 with a volume of 851
(MSCF). The event lasted for 100 minutes and was due to depressurization of 12-B and 12-C commonlines for removal of
pig launcher and receiver.
A flaring event occurred at FS2 starting at 06/30/2013 00:54 and stopping at 06/30/2013 04:03 with a volume of 929
(MSCF). The event lasted for 189 minutes and was due to depressurization of A -HP, B -HP, MP & A -Treater Flash Drum
for A -train turnaround work. Flaring stopped when the HP oil trains were depressured.
Please let me know if you have any questions.
Kellie Okonek (alt. Travis Rybicki)
PCC/EOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 382 1370 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akopsocceoctl(Mbp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DiSPORITinN
1. Facility Number
0290000028
2. Facility Name
PBU FS 1
3. Field
PBU - EOA
4. Operator .. . •
BP
5. MonthNear of Disposition
July -2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
U
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
4,498
9. Flared or vented more than 1 hour (see instr.)
6,459
10. Pilot and Purge
31,028
11. Assist Gas
49,544
12. Fuel gas used in lease operations.
741,732
13. Other (see instructions)
U
Official Use Only
Authorization >l hr:
Safety
/ � �� c
MCF
14. TOTAL VOLUME (ITEMS 6-12)
833,261
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
U
Waste:
MCF
17. Transferred from: CGF
275,393
/ SL6 -3
Commissioner Date
—T��
18. Transferred to. (Express as a negative #) CGF & CCP
-63,851,644
19. Remarks:
I hereby certify that the foregoing is trueand correct to the best of my knowledge.
'j�� Note: All volumes must be corrected
Signature C�'�- l�L'GCC� J Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psia and to a
�/� temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
lil_f
13l 0
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -1
GAS FLARING INCIDENT REPORT
July 2013
7/22/2013
1213-1300
3,692 Not required for unplanned events <= 1 hr
Not required for unplanned events <= 1 hr
7/23/2013
0508-0514
19
0
7/26/2013
1022-1042
90
1,702
7/27/2013
1700-1800
292
31,028
7/28/2013
1022-1042
90
91,529
7/28/2013
1430-1440
45
7/29/2013
0320-0345
122
7/29/2013
0540-0607
7
7/30/2013
2216-2245
141
TOTAL
4,498
Unplanned Events greater than 1 hour
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
7/18/2013
1451-1650
702 See attachments
See attachments
7/26/2013
1115-1315
550
7/28/2013
1115-1430
880
7/28/2013
1440-2340
2,625
TOTAL
4,757
or Equal 1 Hour AND <=
See attachments
TOTAL 0
See attachments
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTI ON TAKEN TO ELIMINATE CAU SE
7/1/2013 1635-2020 851 See attachments See attachments
7/7/2013 0950-1130 851
TOTAL 1,702
Page 4
8/12/2013
234 PM
TOTAL
Unplanned Events <1 Hour
4,498
Unplanned Events> 1 Hour
4,757
Planned Events <l hour and not
0
exceeding 5,000 MCF
Planned Events> 1 hour or
1,702
exceeding 5,000 MCF
Pilot Purge
31,028
Assist
49,544
TOTAL FLARED VOLUME
91,529
Page 4
8/12/2013
234 PM
Flare Start Date 07/01/2013
Flare End Date 07/3112013
FS1 Flare Report Total Volume (MSCF) 10957
Report
Numbs System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
13-342 Controlled Blowdown 07/01/2013 4:35:00 pm 8:20:00 pm 225 min No No Yes BP1\DEITZBJ 851
Determination Cause DS 12 shutdown for planned maintenance
Action Taken Completed depressudng.
13-348 Controlled Blowdown 07/07/2013 9:50:00 am 11:30:00 am 100 min No No
Determination Cause Depressurized 12-B and 12-C commonlines for removal of pig launcher and receiver
Action Taken Depressurized lines to flare header pressure and Closed the flare valves.
13-355 Other 07/18/2013 2:51:00 pm 4:50:00 pm 119 min No No
Determination Cause STV -IP 'RC 1802 unloaded due to temperature.
Action Taken Loaded STV/IP T/C,
Yes BP1\WAKEMJP 851
No 131`1\BELLZO 702
13-370 Flare Relief 07/26/2013 11:15:00 am 1:15:00 pm 120 min No No No BP1\BARRERS 550
Determination Cause TIC -1802 shut down on STV high discharge temp.
Action Taken T/C=1802 was restarted and loaded.
13-371 Flare Relief 07/28/2013 11:15:00 am 2:30:00 pm 195 min Yes No No BP1\BARBERS 880
Determination Cause T/C-1802 shut down due to STV high discharge temp.
Action Taken TIC -1 802 restarted.
Generated 08/07/2013 11:29:06AM Page 5 of l l
Flare Start Date 07/01/2013
Flare End Date 07/3112013
13-371 Flare Relief 07/28/2013 2:40:00 pm 11:40:00 pm 540 min No No No BPI W UNTL2 2625
Determination Cause STV -IP TIC1802 shutdown due to a problem associated HI discharge temps
Action Taken Loaded STV/IP TIC.
Total Volume (MSCF) 10957
Generated 08/07/2013 11:29:06AM Pages of 11
Hunt, Jennifer L (DOA)
From:
AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent:
Sunday, July 07, 2013 6:18 PM
To:
Hunt, Jennifer L (DOA)
Cc:
Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, HSSEE Env Adv East; Burgess, David H; AK, OPS GC1 Facility OTL;
AK, OPS GC1 OSM; AK, OPS FS2 OSM; AK, OPS FS2 Facility OTL; AK, HSSEE Env Adv
West; AK, OPS GC3&PCC OSM; AK, OPS GC3 Facility & Field OTL; AK, OPS FS1 OSM;
AK, OPS FS1 Facility OTL; Kruger, Dale 0
Subject:
Gas flaring events at GC1, GC3, FS1, FS2
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
iennifer.hunt(aalaska.00v dave.robvO-alaska.00v victoria.fergusonoalaska.aov
From: Kellie Okonek, GPB Production Optimization Team Leader
A flaring event occurred at GC1 starting at 06/28/2013 16:30 and stopping at 06/28/2013 18:15 with a volume of 390
(MSCF). The event lasted for 105 minutes and was due to depressurization of spare GLT compressor when EOA Big AL
was loaded. Flaring stopped when depressurization was complete.
A flaring event occurred at GC1 starting at 06/29/2013 17:57 and stopping at 06/29/2013 19:10 with a volume of 10
(MSCF). The event lasted for 73 minutes and was due to start-up test for K-7000 and spin of coppus for cool down.
A flaring event occurred at GCI starting at 07/05/2013 00:00 and stopping at 07/06/2013 with a volume of 40 (MSCF).
The event lasted for 1440 minutes and was due to flaring during GLT K3300 startup. Flaring stopped when startup
complete.
A flaring event occurred at GC3 starting at 06/29/2013 19:09 and stopping at 06/29/2013 20:10 with a volume of 551
(MSCF). The event lasted for 61 minutes and was due to LPS compressor s/d due to thermocouple deviations and V4
recycle valve IIP failure. Flaring stopped when production was curtailed and compressor re -loaded after repairs complete.
A flaring event occurred at FS1 starting at 06/27/2013 20:35 and stopping at 06/27/2013 23:00 with a volume of 604
(MSCF). The event lasted for 145 minutes and was due to unloading of the 1802 STV/IP compressor due to high ambient
temps. Flaring stopped when the alternate 1801 compressor was loaded.
A flaring event occurred at FS1 starting at 06/28/2013 00:01 and stopping at 06/28/2013 01:26 with a volume of 354
(MSCF). The event lasted for 85 minutes and was due to unloading of the 1801 STV/IP compressor due to high ambient
temps. Flaring stopped when the alternate 1802 compressor was loaded..
A flaring event occurred at FS1 starting at 07/01/2013 16:35 and stopping at 07/01/2013 20:20 with a volume of 851
(MSCF). The event lasted for 225 minutes and was due to depressurization of DS12 for planned maintenance. Flaring
stopped when depressure complete.
A flaring event occurred at FS1 starting at 07/07/2013 09:50 and stopping at 07/07/2013 11:30 with a volume of 851
(MSCF). The event lasted for 100 minutes and was due to depressurization of 12-B and 12-C commonlines for removal of
pig launcher and receiver.
A flaring event occurred at FS2 starting at 06/30/2013 00:54 and stopping at 06/30/2013 04:03 with a volume of 929
(MSCF). The event lasted for 189 minutes and was due to depressurization of A -HP, B -HP, MP & A -Treater Flash Drum
for A -train turnaround work. Flaring stopped when the HP oil trains were depressu red.
Please let me know if you have any questions.
Kellie Okonek (alt. Travis Rybicki)
PCC/EOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 382 1370 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akoosocceoctl aobp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DIRPORITMN
1. Facility Number
0290000028
2. Facility Name
PBU FS 1
3. Field
PBU - EOA
4. Operator
BP
5. Month/Year of Disposition
AU Ust-2013
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
1,239
9. Flared or vented more than 1 hour (see instr.)
16,319
10. Pilot and Purge
30,436
11. Assist Gas
65,060
12. Fuel gas used in lease operations.
715,022
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
�6 ✓?`
MCF
14. TOTAL VOLUME (ITEMS 6-12)
828,076
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
296,881
/ _
Commissioner Date
18. Transferred to: (Express as a negative #) CGF & CCP
-65,872,795
19. Remarks:
I hereby certify that foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature_ - "(LL'1 Q� l.L.'�Y(/L•� Title Manager Production Taxes and Ro a ties Alaska to pressure of 14.65 psia and to a
j % % / temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date / , / / -�' AA C25.235.
YL/—
/,/ ff/
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT -FS -1
GAS FLARING INCIDENT REPORT
August 2013
DATe
TTME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE _
ACTION TAKEN TO ELIMINATE CAUSE
8/1/2013
1210-1240
188
Not required for unplanned events <= 1 hr
Not required for unplanned events <= 1 hr
8/1/2013
1315-1345
188
Pilot Purge
8/2/2013
0915-0935
125
TOTAL FLARED VOLUME
113,054
8/2/2013
1515-1608
176
8/7/2013
0850-0940
312
8/7/2013
1330-1410
250
TOTAL
1,239
Unplanned Events greater than 1 hour
DATE
TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
8/1/2013
1430-2348
3,496
See attachments
See attachments
8/2/2013
0131-0845
2,411
8/2-3/2013
0945-1125
9,031
8/15/2013
0001-1542
1,381
TOTAL
16,319
TIME
See attachments
TOTAL 0
TIME
See attachments
TOTAL 0
ACTION TAKEN TO E
See attachments
See attachments
Page 3
9/12/2013
3:32 PM
TOTAL
Unplanned Events< 1 Hour
1,239
Unplanned Events> 1 Hour
16,319
Planned Events <1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
30,436
Assist
65,060
TOTAL FLARED VOLUME
113,054
ACTION TAKEN TO E
See attachments
See attachments
Page 3
9/12/2013
3:32 PM
Flare Start Date 08/01/2013
Flare End Date 08/31/2013
FSI Flare Report Total Volume (MSCF) 17558
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
13-376 Flare Relief 08/01/2013 2:30:00 pm 11:48:00 pm 558 min No No
Determination Cause STV -IPM unloaded due to temperature.
Action Taken Loaded STV/IP T/C.
No BPI\HOGUERC 3496
13-379 Flare Relief 08/02/2013 1:31:00 am 8:45:00 am 434 min No No No BPI\DEITZBJ 2411
Determination Cause STV-IPT\C 1802 unloaded due to temperature.
Action Taken Loaded STV/IP TIC.
13-379 Flare Relief 08/02/2013 9:45:00 am 12:00:00 am 855 min No
Determination Cause STV -IP T\C 1802 unloaded due to temperature.
Action Taken Loaded STV/IP T/C.
13-382 Flare Relief 08/03/2013 12:00:00 am 11:25:00 am 685 min No
Determination Cause STV -IP TIC 1802 unloaded due to temperature.
Action Taken Loaded STV/IP T/C.
No
No
13-412 Flare Relief 08/15/2013 12:01:00 pm 3:42:00 pm 221 min No No
Determination Cause TIC 1802 Shutdown for unplanned maintenance
Action Taken Completed shutdown, restarted compressor.
Generated 09/04/2013 10:13:15AM
No BP1\DEITZBJ 4750
No BPI\DEITZBJ 4281
No BPIICALHOUJ 1381
Total Volume (MSCF) 17558
Page 3 of 12
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent: Sunday, August 18, 2013 8:57 AM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; Burgess, David H; AK, OPS FS1 Facility OTL; AK, OPS FS1 OSM; AK,
HSSEE Env Adv East
Subject: Gas flaring events at FS1
To: Jennifer Hunt, AOGCC
iennifer.huntt7a.alaska.gov
CC: Dave Roby, AOGCC
dave.robv g alaska.gov
From: Travis Rybicki, GPB Production Optimization Team Leader
CC: Victoria Ferguson, AOGCC
victoria.ferguson(dalaska.gov
A flaring event occurred at FS1 starting at 08/01/2013 14:30 and stopping at 08/01/2013 23:48 with a volume of 3496
(MSCF). The event lasted for 558 minutes. Flaring was due low to the unplanned unloading of STV/IP T/C 1802 due to
discharge temperature. Flaring continued until the machine was loaded. Flaring ended when T/C 1802 was loaded and
flare valves closed.
A flaring event occurred at FS1 starting at 08/02/2013 01:31 and stopping at 08/02/2013 08:45 with a volume of 2411
(MSCF). The event lasted for 434 minutes. Flaring was due low to the unplanned unloading of STV/IP T/C 1802 due to
discharge temperature. Flaring continued until the machine was loaded. Flaring ended when T/C 1802 was loaded and
flare valves closed.
A flaring event occurred at FSI starting at 08/02/2013 09:45 and stopping at 08/02/2013 24:00 with a volume of 4750
(MSCF). The event lasted for 855 minutes. Flaring was due low to the unplanned unloading of STV/IP T/C 1802 due to
discharge temperature. Flaring continued until the machine was loaded. Flaring ended when T/C 1802 was loaded and
flare valves closed.
A flaring event occurred at FS1 starting at 08/03/2013 00:00 and stopping at 08/03/2013 11:25 with a volume of 4281
(MSCF). The event lasted for 685 minutes. Flaring was due low to the unplanned unloading of STV/IP T/C 1802 due to
discharge temperature. Flaring continued until the machine was loaded. Flaring ended when T/C 1802 was loaded and
flare valves closed.
These events occurred during the time period that the CGF process was shut down for planned maintenance. CGF NGLs
were unavailable for divert to FS1 to assist in loading the STV/IP compressors.
A flaring event occurred at FS1 starting at 08/15/2013 12:01 and stopping at 08/15/2013 15:42 with a volume of 1381
(MSCF). The event lasted for 221 minutes. Flaring was due low to the unplanned shutdown of STV/IP T/C 1802. Flaring
continued while maintenance was performed on the unit. Flaring ended when T/C 1802 was restarted, loaded and flare
valves closed.
Please let me know if you have any questions.
Travis M. Rybicki
PCC-EOC (Production Optimization) Team Lead
Office 907-659-4472 (BOC) 659-5566 (PBOC)
Cell 907-748-2118 Harmony 758-4404
GPB Pager 907-659-5272 # 1890
akops occeoctl (c)b p. com
Alternate: Kellie Okonek
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PROnucFn r.ec n1QDnc1T1nA1
1. Facility Number 2. Facility Name
0290000028 PBU FS 1
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator 5. Month/Year of Disposition
BP September -2013
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
973
9. Flared or vented more than 1 hour (see instr.)
1,362
10. Pilot and Purge
34,580
11. Assist Gas
62,592
12. Fuel gas used in lease operations.
675,564
13. Other (see instructions)
Official Use Only
Authorization >l hr:
Safety
l,
3 Z
MCF
14. TOTAL VOLUME (ITEMS 6-12)
775,071
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
O
Waste:
MCF
17. Transferred from: CGF
292,746
Commissioner Date
18. Transferred to: (Express as a negative #) CGF & CCP
-59,094,469
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
60� � - Note: All volumes must be corrected
Signature Title Manager Production Taxes and Ro aIties Alaska to pressure of 14.65 psia and to a
Printed Name Diane Colley temperature of 60o F. Authority 20
Phone (907) 564-5775 Date f f J AAC25.235,
VL—
&1Z)14-
Form
L6/Z)t4-
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
SP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -1
GAS FLARING INCIDENT REPORT
September 2013
jUnplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
9/6/2013 1440-1540 229 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
9/27/2013 0330-0423 258
9/27/2013 0521-0546 122
9/29/2013 0440-0501 102
TOTAL 711
9/9/2013 1730-1900
565 See attachments
See attachments
9/26-27/2013 2300-0145
797
TOTAL
1,362
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME
VOLUME DESCRIPTION OF INCIDENT&CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
9/6/2013 0300-0301
3 See attachments
See attachments
9/23/2013 1015-1100
259
TOTAL
262
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME
VOLUME DESCRIPTION OF INCIDENT&CAUSE
ACTION TAKENTO ELIMINATE CAUSE
See attachments
See attachments
TOTAL
0
TOTAL
Unplanned Events < 1 Hour
711
Unplanned Events> 1 Hour
1,362
Planned Events < 1 hour and not
262
exceeding 5,000 MCF
Planned Events> 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
34,580
Assist
62,592
TOTAL FLARED VOLUME
99,507
Page 3
10/11/2013
8:58 AM
Flare Start Date 09/01/2013
Flare End Date 09/30/2013
FS1 Flare Report
Total Volume (MSCF) 2335
Report
No
No
BPI WORTONR
565
Numbe
System Date
Start Time
Stop Time
Duration Intermittent Black Smoke Planned Reported By Volume
13-445
Controlled Blowdown 09/06/2013
3:00:00 am
3:01:00 am
1 min No No Yes BPI\NORTONR 3
Determination Cause T\C 1802 shutdown for planned maintenance
Action Taken Completed shutdown.
13-451 Flare Relief 09/09/2013 5:30:00 pm 7:00:00 pm 90 min Yes
No
No
BPI WORTONR
565
Determination Cause STV -IP -RC 1801 shut down due to a problem associated with an upset in the oil section.
Action Taken Loaded STV/IP T/C 1801.
13-483 Controlled Blowdown 09/23/2013 10:15:00 am 11:00:00 am 45 min No
No
Yes
BP1\BARRERS
259
Determination Cause Shutdown/depressurad CL 18D for a choke change
Action Taken Completed depressudng of CL 18D
13493 Controlled Blowdown 09/26/2013 11:00:00 pm 11:59:00 pm 59 min No
No
No
BPI\HUNTL2
287
Determination Cause M 1802 shutdown due to a problem associated with lube oil leak on GG
Action Taken Loaded STV/1P T/C. 1801
13494 Flare Relief 09/27/2013 12:00:00 am 1:45:00 am 105 min No
No
No
BP1\HUNTL2
510
Determination Cause T\C 1802 shutdown due to a problem associated with lube oil leak on GG
Action Taken Loaded STV/IP TIC. 1801
Total Volume (MSCF) 2335
Generated 10/02/2013 9:20:43AM Page 3 of 10
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent: Tuesday, September 17, 2013 9:45 AM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; Burgess, David H; AK, OPS FSI Facility OTL; AK, OPS FSI OSM; AK,
HSSEE Env Adv East
Subject: Gas flaring events at!
To: Jennifer Hunt, AOGCC
jenniter.huntCa alaska.00v
CC: Dave Roby, AOGCC
dave. roby(dalaska.gov
From: Travis Rybicki, GPB Production Optimization Team Leader
CC: Victoria Ferguson, AOGCC
victoria.ferouson( alaska.gov
A flaring event occurred at FS1 starting at 09/06/2013 14:40 and stopping at 09/06/2013 15:40 with a volume of 229
(MSCF). The event lasted for 60 minutes. Flaring was due to unplanned shutdown of STV/IP T/C 1801 due to high
discharge temperature. Flaring continued while T/C 1801 was restarted. Flaring ended when T/C 1801 was restarted,
loaded and flare valves closed.
A flaring event occurred at FS1 starting at 09/09/2013 17:30 and stopping at 09/09/2013 19:00 with a volume of 565
(MSCF). The intermittent event lasted for 90 minutes. Flaring was due to unplanned shutdown of STV/IP T/C 1801 due to
a problem associated with an upset in the oil section of the facility. Flaring continued while T/C 1801 was restarted.
Flaring ended when T/C 1801 was restarted, loaded and flare valves closed.
Please let me know if you have any questions.
Travis M. Rybicki
PCC-EOC (Production Optimization) Team Lead
Office 907-659-4472 (BOC) 659-5566 (PBOC)
Cell 907-748-2118 Harmony 758-4404
GPB Pager 907-659-5272 * 1890
a kopspcceoctl (a7 bp. co m
Alternate: Kellie Okonek
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent: Monday, September 30, 2013 8:33 AM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, OPS FS3 OSM; AK, OPS FS3 Facility OTL; Burgess, David H; AK,
HSSEE Env Adv East; AK, OPS PCC EOC TL; AK, OPS FS1 OSM; AK, OPS FS1 Facility
OTL
Subject: Gas flaring events atm FS3
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson,
AOGCC
iennifer.huntC alaska.gov dave.robvncalaska.gov
victoria.ferguson cD.alaska.gov
From: Kellie Okonek, GPB Production Optimization Team Leader
A flaring event occurred at FS3 starting at 09/29/2013 16:00 and stopping at 09/29/2013 19:00 with a volume of 638
(MSCF). The event lasted for 180 minutes, and was due to 1803 water wash. Flaring stopped when the water wash was
complete.
A flaring event occurred at FS1 starting at 09/27/2013 00:00 and stopping at 09/27/2013 01:45 with a volume of 510
(MSCF). The event lasted for 105 minutes, and was due to T/C 1802 shutdown due to a lube oil leak on the GG. Flaring
stopped when STV/IP T/C 1801 was loaded.
Please let me know if you have any questions.
Kellie Okonek (alt. Travis Rybicki)
PCCIEOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 382 1370 Harmony: 758 4404
Pager 574 (WOA - access #4236) or 1890 (EOA - access #5100)
e-mail akoosocceoctl(a)bo.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAR ni-qpn-qiT1nN
1. Facility Number2. Facility Name
0290000028 PBU FS 1
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator v •5. MonthfYear of Disposition
BP I October -2013
20. "rproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
U
Pool Name Pool Code Percent
7. Reinjected
U
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
29,417
11. Assist Gas
57,017
12. Fuel gas used in lease operations.
727,201
13. Other (see instructions)
U
Official Use Only
Authorization>1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 8-12)
813,635
Lease Use
MCF
15. NGL Gas Equivalent
U
Conservation
MCF
16. Purchased gas
U
Waste:
MCF
17. Transferred from: CGF
296,768
Commissioner Date
18. Transferred to: (Express as a negative #) CGF & CCP
-73,237,061
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
� Note: All volumes must be corrected
Signature lt>✓/� IV Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235,
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000028
2. Facility Name
PBU FS 1
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
November -2013
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Pool Name Pool Code Percent
7. Reinjected
U
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
3
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
29,452
11. Assist Gas
63,513
12. Fuel gas used in lease operations.
783,363
13. Other (see instructions)
U
Official Use OnlyAuthorization>1
he
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
876,331
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
O
Waste:
MCF
17. Transferred from: CGF
287,846
Commissioner Date
18. Transferred to: (Express as a negative #) CGF & CCP
-75,383,320
19. Remarks:
I hereby certify that a foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature 6&W Title Manager Production Taxes and Ro allies Alaska to pressure of 14.65 psia and to a
l/ temperature of 60o F. Authority 20
Printed Name Diane Co / /lle Phone (907) 564-5775 Date i AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000028
2. Facility Name
PBU FS 1
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
I December -2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
O
Pool Name Pool Cade Percent
7. Reinjected
U
PRUDHOE 640150 100.00%-
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see inso.)
21,347
10. Pilot and Purge
30,348
11. Assist Gas
37,584
12. Fuel gas used in lease operations.
801,106
13. Other (see instructions)
O
Official Use Only
Authorization >1 hr
Safety
a 1,34
MCF
14. TOTAL VOLUME (ITEMS 6.12)
890,385
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from: CGF
297,151
/ / , ('
'{—v— L 7
Commissioner Date
18. Transferred to: (Express as a negative #) CGF &CCP
-80,884,250
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
h� f �/ye A Note: All volumes must is corrected
Signature i' L �•+C��'` i Title Mana er Production Taxes and R allies Alaska to pressure of 14.65 psis and f0 a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date i % AAC25.235.
rL, r
613114
Form 10422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
1134111
TIME
TOTAL
N
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -1
GAS FLARING INCIDENT REPORT
December 2013
Not required for unplanned events <= 1 hr
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
12/29/2013
0246-0432
21,347 See attachments
See attachments
TOTAL
21,347
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
TOTAL
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
IN
0
TOTAL
0
21,347
0
0
30,348
37,584
89,279
DESCRIPTION OF INCIDENT & CAUSE
See attachments
See attachments
Page 4
1/12/2014
10:27 AM
Flare Start Date 12/01/2013
Flare End Date 12/31/2013
FSS Flare Report
Total Volume (MSCF)
21347
Report
Numbs System Date Start Time
Stop Time Duration Intermittent
Black Smoke Planned Reported By
Volume
13-598 Flare Relief 12/29/2013 2:46:00 am
4:32:00 am 106 min Yes
No No BPI\NORTONR
21347
Determination Cause T\C 1803 shutdown due to a problem associated with turbine vibration.
Action Taken Shut in wells at DS#2 and DW.
Total Volume (MSCF)
21347
Generated 01/06/2014 9:50:43AM Page 4 of 8
Hunt, Jennifer L (DOA)
From:
AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent:
Tuesday, January 07, 2014 7:43 AM
To:
Hunt, Jennifer L (DOA)
Cc:
Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; Burgess, David H; AK, OPS FS1 Facility OTL; AK, OPS FS1 OSM; AK,
HSSEE Env Adv East
Subject:
Gas flaring event at FS1
To: Jennifer Hunt, AOGCC
iennifer.hunt aaalaska.gov
CC: Dave Roby, AOGCC
dave.robV(a)alaska.aov
From: Travis Rybicki, GPB Production Optimization Team Leader
CC: Victoria Ferguson, AOGCC
victoria.fera uson(aalaska.aov
A flaring event occurred at FS1 starting at 12/29/2013 02:46 and stopping at 12/29/2013 04:32 with a volume of 21347
(MSCF). The intermittent event lasted for 106 minutes. Flaring was due low to the unplanned shutdown of the LPS
Compressor T/C 1803 due to a vibration problem. Flaring continued while LP rate was cut to FSI. Flaring ended when
sufficient rate was cut and flare valves closed.
Please let me know if you have any questions.
Travis M. Rybicki
PCC-EOC (Production Optimization) Team Lead
Office 907-659-4472 (BOC) 659-5566 (PBOC)
Cell 907-748-2118 Harmony 758-4404
GPB Pager 907-659-5272 # 1890
akopsocceoctl (a? b p. com
Alternate: Kellie Okonek