Gas Disposition Files
Year: 2013
Facility: PBU FS 2
Operator: BP EXPLORATION (ALASKA)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PROni lrFn me n1cDnc1T1r%K1
Facility Number 2. Facility Name
0290000029 PBU FS 2
Disposition
3. Field
PBU - EOA
Volume MCF
VWl I 1%01,v1.
4. Operator 5. MonthNear of Disposition
BP January -2013
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
U
Pool Name Pool Code Percent
7. Reinjected
U
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
13,062
11. Assist Gas
U
12. Fuel gas used in lease operations.
752,453
13. Other (see instructions)
Official Use Only
Authorization >1 hr:
Safety
14. TOTAL VOLUME (ITEMS 6-12)
765,515
Lease Use
JMCF
15. NGL Gas Equivalent
0
Conservation
16. Purchased gas
U
aste:
17. Transferred from: CGF
319,316
18. Transferred to: (Express as a negative #) CGF
-19,376,289
Commissioner Date
19. Remarks:
I hereby certify that L��e foregoing is true and correct to the best of my knowledge.
CCK! t / tF" Note: All volumes must be corrected
Signature Title Manager Production Taxes a d Ro allies Alaska to pressure of 14.65 psia and to a
q temperature of 600 F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date --) tJ AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
DATE
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -2
GAS FLARING INCIDENT REPORT
January 2013
DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr Not required for unplanned events <=1 hr
TOTAL 0
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
IDZ\fP
TOTAL 0
See attachments
TOTAL 0
See attachments
Page 4
2/13/2013
3:46 PM
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events > 1 Hour
0
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events> 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
13,062
Assist
0
TOTAL FLARED VOLUME
13,062
See attachments
Page 4
2/13/2013
3:46 PM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS niSpnSiTinti
1. Facility Number2. Facility Name
0290000029 PBU FS 2
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator . ... • 5. MonthNear of Disposition
BP February -2013
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Pool Name Pool Code Percent
7, Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
108
9. Flared or vented more than 1 hour (see instr.)
2,965
10. Pilot and Purge
12,393
11. Assist Gas
0
12, Fuel gas used in lease operations.
686,866
13. Other (see instructions)
U
Official Use Only
Authorization>1 hr:
Safety
� 9G 5—
MCF
14. TOTAL VOLUME (ITEMS 6-12)
702,332
Lease Use
MCF
15. NGL Gas Equivalent
U
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
295,798
3
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-17,028,444
19, Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Q% A Note: All volumes must be corrected
Signature /I Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
/ )� temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Uate / AAC25.235.
VL --F
31Z'9 /J 3
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -2
GAS FLARING INCIDENT REPORT
February 2013
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
2/22/2013 0915-1000 108 Not required for unplanned events <= 1 hr
TOTAL 108
LrLr14L514
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr
ACTION TAKEN TO I
See attachments
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
DATE
2/26/2013
TOTAL
0600-1610
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
0
2,965 See attachments
2,965
TOTAL
108
0
0
2,965
12,393
0
15,466
& CAUSE
See attachments
Page 4
3/13/2013
9:52 AM
Flare Start Date 02/01/2013
Flare End Date 02/28/2013
FS2 Flare Report Total Volume (MSCF) 3073
Report
Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
13-90 Flare Relief 02/26/2013 6:00:00 am 4:10:00 pm 610 min No No Yes BP1\BOOKAP 2965
Determination Cause Shutdown 1802 and removed turbine. Replaced 1801's turbine with 1802's turbine
Action Taken Shutdown 1802 and removed turbine. Replaced 1801's turbine with 1802's turbine. Loaded STV/IP TIC 1801 once it was replaced.
Total Volume (MSCF) 3073
Generated 03/07/2013 3:52:03PM
Page 3 of 9
McMains, Stephen E (DOA)
From:
AK, OPS PCC EOC TL (AKOPSPCCEOCTL@bp.com]
Sent:
Saturday, March 02, 2013 6:50 AM
To:
McMains, Stephen E (DOA)
Cc:
Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, OPS FS2 Facility OTL; Burgess, David H; AK, HSSEE Env Adv East; AK,
OPS FS2 OSM
Subject:
RE: Gas flaring events at FS2
To: Steve McMains, AOGCC
Steve. mcmainsCcDalaska.gov
CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
dave.robyaaalaska.gov victoria.fer-gusonCaalaska.aov
From: Travis Rybicki, GPB Production Optimization Team Leader
A flaring event occurred at FS2 starting at 02/26/2013 06:00 and stopping at 02/26/2013 16:10 with a volume of 2965
(MSCF). The event lasted for 610 minutes and was due to flaring associated with the planned shutdown of the STV/IP T/C
1802 to allow the LM -1500 turbine gas generator unit to be removed from T/C 1802 and installed in the offline STV/IP T/C
1801 train. Swapping the engine unit is needed to address mechanical vibration issues on unit in 1801, 1801 STV/IP
compressor train must be operational to progress subsequent planned project work. Flaring continued during the planned
turbine swap, and the FS2 facility remained online due to low ambient temperatures. Flaring ended when T/C 1801 was
started, loaded and the flare valves closed.
Please let me know if you have any questions.
Travis M. Rybicki
PCC-EOC (Production Optimization) Team Lead
Office 907-659-4472 (BOC) 659-5566 (PBOC)
Cell 907-748-2118 Harmony 758.4404
GPB Pager 907-659-5272 # 1890
a kopspcceoctl (cD bp. com
Alternate: Kellie Okonek
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000029
2. Facility Name
PBU FS 2
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
March -2013
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
O
Pool Name Pool Cade Percent
7. Reinjected
U
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
2,200
10. Pilot and Purge
14,224
11. Assist Gas
12. Fuel gas used in lease operations.
744,331
13. Other (see instructions)
U
Official Use Only
Authorization>1 hr:
Safety
2200
MCF
14. TOTAL VOLUME (ITEMS 6-12)
760,755
Lease Use
MCF
15. NGL Gas Equivalent
U
Conservation
MCF
16. Purchased gas
Waste:
MCF
17, Transferred from: CGF
316,359
n
/!/ /
/Comm ssioner (' Date
18. Transferred to: (Express as a negative #) CGF
-16,598,298
19. Remarks:
I hereby certity that thne foregoing is true and correct to the best of my knowledge.
Signature 4/ (!/�� Note: All volumes must be corrected
y1/' a Title Manager Production Taxes and Boyalties Alaska to pressure of 14.65 psia and to a
,/ / /� temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date 7 AAC25.235.
V'L6=
�,/i2 J 3
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
or equal to
TOTAL
0
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -2
GAS FLARING INCIDENT REPORT
March 2013
Not required for unplanned events <= 1 hr
Not required for unplanned events <= 1 hr
VAI[ TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE - ACTION TAKEN TO ELIMINATE CAUSE
3/3/2013 0835-1307 1,133 See attachments See attachments
3/3/2013 1456-1912 1,067
TOTAL 2,200
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT &CAUSE ACTION TAKEN TOEUMINATE CAUSE
See attachments See attachments
TOTAL 0
See attachments
TOTAL 0
See attachments
Page 4
4/10/2013
1:30 PM
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events> 1 Hour
2,200
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
14,224
Assist
0
TOTAL FLARED VOLUME
16,424
See attachments
Page 4
4/10/2013
1:30 PM
Flare Start Date 03/01/2013
Flare End Date 03/31/2013
FS2 Flare Report Total Volume (MSCF) 2200
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
13-98 Other 03/03/2013 8:35:00 am 1:07:00 pm 272 min No No No
Determination Cause STV -IP TC 1801 shutdown due to a problem associated with PT lube oil leak.
Action Taken Changed out lube hose and restarted machine.
13-98 Other 03/03/2013 2:56:00 pm 7:12:00 pm 256 min No No No
Determination Cause STV -IP nC 1801 shutdown due to a problem associated with PT lube oil leak.
Action Taken Replaced hose fittings and restarted machine.
Generated 04/08/2013 10:49:08AM
BPI WAGNERJ 1133
BPMAGNERJ 1067
Total Volume (MSCF) 2200
Page 4 of 10
McMains, Stephen E (DOA
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent: Monday, March 04, 2013 7:27 AM
To: McMains, Stephen E (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, OPS FS2 Facility OTL; Burgess, David H; AK, HSSEE Env Adv East; AK,
OPS FS2 OSM
Subject: Gas flaring events at FS2
To: Steve McMains, AOGCC
steve. mcmains(aalaska.gov
CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
dave.roby(a)alaska.gov victoria.fergusonoealaska.gov
From: Travis Rybicki, GPB Production Optimization Team Leader
A flaring event occurred at FS2 starting at 03/03/2013 08:35 and stopping at 03/03/2013 13:07 with a volume of 1133
(MSCF). The event lasted for 272 minutes and was due to flaring associated with the shutdown of the STV/IP T/C 1801 to
repair a lube oil leak associated with the machine's power turbine. Maintenance changed out a lube hose and prepared
the machine for restart. Flaring ended when T/C 1801 was started, loaded and the flare valves closed.
A flaring event occurred at FS2 starting at 03/03/2013 14:56 and stopping at 03/03/2013 19:12 with a volume of 1067
(MSCF). The event lasted for 256 minutes and was due to flaring associated with the shutdown of the STV/IP T/C 1801 to
repair a lube oil leak associated with the machine's power turbine. Maintenance changed out lube hose fittings and
prepared the machine for restart. Flaring ended when T/C 1801 was started, loaded and the flare valves closed.
Please let me know if you have any questions.
Travis M. Rybicki
PCC-EOC (Production Optimization) Team Lead
Office 907-659-4472 (80C) 659-5566 (PBOC)
Cell 907-748-2118 Harmony 758-4404
GPB Pager 907-659-5272 # 1890
akopsocceoctl(abo. Com
Alternate: Kellie Okonek
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000029
2. Facility Name
PBU FS 2
3. Field
PBU - EOA
4. Operator
BP
5. Month/Year of Disposition
I Aril -2013
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
a
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
512
10. Pilot and Purge
13,652
11. Assist Gas
0
12. Fuel gas used in lease operations.
734,054
13. Other (see instructions)
O
Official Use Only
Authorization >1 hr:
safety
51, f 2
MCF
14. TOTAL VOLUME (ITEMS 8-72)
746,216
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
U
Waste.
MCF
17. Transferred from: CGF
312,989
l3 _13
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-16,893,135
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
� Note: All volumes must be corrected
Signature L ', i Title Mana er Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date , AAC25.235.
vz� )�--7
611Z/J3
Form 10422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -2
GAS FLARING INCIDENT REPORT
April 2013
or equal to 1 hour
Not required for unplanned events <= 1 hr
TOTAL 0
See attachments
TOTAL 0
See attachments
TOTAL 0
4/23/2013 0051-0307
512 See attachments
TOTAL
512
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events> 1 Hour
0
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events> 1 hour or
512
exceeding 5,000 MCF
Pilot Purge
13,652.
Assist
0
TOTAL FLARED VOLUME
14,164
Not required for unplanned events <= 1 hr
ACTION TAKEN TO ELIMINATE
See attachments
See attachments
See attachments
Page 6
5/14/2013
10:22 AM
Flare StartDate 04/01/2013
Flare End Date 04/30/2013
F52 Flare Report
Total Volume (MSCF)
512
Report
Numbe System Date Start Time
Stop Time Duration Intermittent
Black Smoke Planned Reported By
Volume
13-201 Controlled Blowdown 04/23/2013 12:51:00 am
3:07:00 am 136 min No
No Yes BPI WIITCHEB
512
Determination Cause Depressured gA commonline for corrosion inspection.
Action Taken Depressure complete.
Daily Volume (MSCF)
512
Total Volume (MSCF)
512
Generated 05/07/2013 9:39:07AM Page 5 of 12
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent: Tuesday, April 30, 2013 12:37 PM
To: McMains, Stephen E (DOA); Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, OPS FS2 Facility OTL; AK, OPS FS2 OSM; AK, HSSEE Env Adv East;
Burgess, David H
Subject: Gas flaring event at FS2
To: Jennifer Hunt, AOGCC
ie n n iter. h u ntCd,)alaska. aov
CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
dave.robvCo)alaska.00v victoria.fergusonCa alaska.gov
From: Travis Rybicki, GPB Production Optimization Team Leader
A flaring event occurred at FS2 starting at 04/23/2013 00:51 and stopping at 04/23/2013 03:07 with a volume of 512
(MSCF). The event lasted for 136 minutes and was due to the planned shutdown of Common Line 9A for planned
corrosion inspection activities. Flaring continued while the Common Line was depressured. Flaring ended when the
depressuring activities were completed and flare valves closed.
Please let me know if you have any questions.
Travis M. Rybicki
PCC-EOC (Production Optimization) Team Lead
Office 907-659-4472 (BOC) 659-5566 (PBOC)
Cell 907-748-2118 Harmony 758-4404
GPB Pager 907-659-5272 # 1890
a ko pspcceoctl CED bp. com
Alternate: Kellie Okonek
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000029
2. FacilityName
PBU FS 2
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
May -2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
U
Pool Name Pool Code Percent
7. Reinjected
O
PRUDHOE 640150 100.007/.--
00.00%8.
8.Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
U
10. Pilot and Purge
13,406
11. Assist Gas
9,357
12. Fuel gas used in lease operations.
734,538
13. Other (see instructions)
U
Official Use Only
Authorization >i hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
757,301
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from: CGF
316,218
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-17,965,443
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
avilNote: All volumes must be corrected
Signature l0/Lf' Title Mana er Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
/ 2 temperature of 60o F. Authordy 20
Printed Name Diane Colley Phone (907) 564-5775 Date 7J AAC25.235.
id
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number2.
0290000029
Facility Name
BUFS 2
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
June -2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
O
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
788
9. Flared or vented more than 1 hour (see insh.)
7,518
10. Pilot and Purge
13,279
11. Assist Gas
9,639
12. Fuel gas used in lease operations.
538,679
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
/
MCF
14, TOTAL VOLUME (ITEMS 6-12)
569,903
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
236,398
Commissioner Date
18. Transferred to: (Express as a negative ll) CGF
-13,881,244
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signatureb an ^ � 7�C4— Title Mana er Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
vLr--
q!«/l3
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
6/20/2013 1819-1834
TOTAL
DATE
6/15/2013
6/17/2013
6/18/2013
6/7/2013
6/11/2013
6/16/2013
6/30/2013
TOTAL
1100-1200
1239-1300
0500-0505
TOTAL
TIME
0700-1200
2045-2208
1650-1800
0054-0403
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < I hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -2
GAS FLARING INCIDENT REPORT
June 2013
63 Not required for unplanned events <= 1 hr
63
See attachments
I
468 See attachments
234
725
VOLUME DESCRIPTION OF IN(
5,545 See attachments
576
468
TOTAL
63
0
725
7,518
13,279
9,639
31,224
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr
See attachments
ACTION TAKEN TO E
See attachments
See attachments
Page 4
7/16/2013
11:26 AM
Flare Start Date 06/01/2013
Flare End Date 06/30/2013
FS2 Flare Report
Total Volume (MSCF) 8306
Report
Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
13-300 Controlled Blowdown 06/07/2013 7:00:00 am 1200:00 pm 300 min No No
Determination Cause Depressured Plant for B-tm outage work.
Action Taken Completed depressu ming of plant.
13-314 Flare Relief 06/11/2013 8:45:00 pm 10:08:00 pm 83 min No No
Determination Cause While bringing production rates up following B train outage
Action Taken Starting 1803 T/C.
Yes BP1\RALPHJM 5545
13-324 Controlled Blowdown 06/15/2013 11:00:00 am 1200:00 pm 60 min No
No
Yes
BP1\BOOKAP
468
Determination Cause Depressured CL -4C twice due to a problem associated with pig receiver valves not holding.
Action Taken Completed depressuring.
13-325 Controlled Blowdown 06/16/2013 4:50:00 pm 6:00:00 pm 70 min No
No
Yes
BP1\REIMBT
468
Determination Cause Depressured 4"C/D" commonline for Smart Pigging.
Action Taken Completed depressuring.
13-328 Controlled Blowdown 06/17/2013 12:39:00 pm 1:00:00 pm 21 min No
No
Yes
BP7\REIMBT
234
Determination Cause Depressurized 4"C/D" to remove Pig Launcher/Receiver.
Action Taken Completed depressuring.
13-330 Controlled Blowdown 06/18/2013 5:0000 am 5:05:00 am 5 min No
No
Yes
BP7\REIMBT
23
Determination Cause De -Pressure V'C/D" from 27 psig for smart pig launcher/receiver removal.
Action Taken Completed depressuring.
13-341 Flare Relief 06/30/2013 12:54:00 am 4:03:00 am 189 min No No Yes BP7\RALPHJM 929
Determination Cause Depresured A -HP, B -HP, A -IP 8 A -Treater Flash Drum for A -train turnaround work
Action Taken Completed depressuring of HP oil trains.
Total Volume (MSCF) 8306
Generated 07/09/2013 4:10:03PM Page 5 of 10
r1unt, Jennifer L DVA
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj
Sent: Saturday, June 08, 2013 3:17 PM
To: Hunt, Jennifer L (DOA)
To: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary ;
Arthur, Gregory; AK, HSSEE Env Adv East; Burgess, David H; AK, OPS CGF OTL; AK, OPS
Ccp CG OPS GC1 OSM; AK, OPS FS21 OSM; AKFacility K,, OPS FS2 FacilCylOTL; AK, OHSSEE Env ps PCC OAdv West;
AK, HSSEE Env Adv Central; AK, OPS GC3&PCC OSM; AK, OPS GC3 Facility & Field OTL;
AK, OPS FS1 OSM; ACGF, GC1 Gty OTL
Subject: Gas flaring events a
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC
CC: Victoria Ferguson, AOGCC
dave rob @alaska.gov victoria.ferguson(J�alaska.gov
iennifer hunt@alaska.gov
From: Kellie Okonek, GPB Production Optimization Team Leader
7/2013 12:00 with a
FS2 startinat 06/07/2013 07:00 an
(A flaring event occurredMSCF). The event la edtforr 300 minutes. The event had a volume gpreatertthaln05000 (MSCF) and wasld eet f 5545
depressurization of the plant for a planned B -train isolation. Flaring stopped when depressurization was complete.
A flaring event occurred at CGF starting at 06/0712013 10:52 and stopping at 06/07/2013 14:10 with a volume of 11518
(MSCF). The event lasted for 198 minutes. The event had a volume greater than 5000 (MSCF), and was due a and MI
compressor shutdown. Flaring stopped when troubleshooting was complete and the compressor was re -loaded and
facility operations stabilized.
A flaring event occurred at CGF starting at 06/0212013 18:32 and stopping at 0610212013 20:10 with a volume of 12410
(MSCF). The event lasted for 98 minutes. The event had a volume greater than 5000 (MSCF), and was due to shutdown
of TIC 1805 for planned maintenance to replace a failed vibration card. Flaring stopped when the card was replaced and
the T/C returned to service. od to
of an
P eviousflheader Ipressuor indicators showed C psig for the day I. which are nowbetnd ter a ore sundero pportthathnorflaring occurred.incorrect meter. The
at GCI starting at 05/13/2013 00:00 and stopping at 05/14/2013 with a volume of 0 (MSCF). The event lasted for 1440
minutes.
at GCI starting at 05112/2013 00:00 and stopping at 0 5/13/2013 with a volume of 0 (MSCF).
minutes.
at GC1 starting at 05/1112013 00:00 and stopping at 05/12/2013 with a volume of 0 (MSCF).
minutes.
The event lasted for 1440
at GC1 starting at 05/10/2013 00:00 and stopping at 05111/2013 with a volume of 0 (MSCF).
minutes.
mi te starting at 05/1012013 00:00 and stopping at 05/11/2013 with a volume of 0 (MSCF).
minutes.
mi te starting at 05/09/2013 00:00 and stopping at 05/10/2013 with a volume of 0 (MSCF)
minutes.
The event lasted for 1440
The event lasted for 1440
The event lasted for 1440
The event lasted for 1440
starting at 05/08/2013 00:01 and stopping at 05/09/2013 with a volume of 0 (MSCF). The event lasted for 1439
ares.
A flaring event occurred at GC3 starting at 06/07/2013 00:05 and stopping at 06/07/2013 09:00 with a volume of 2000
(MSCF). The event lasted for 535 minutes and was due to depressurization of the plant for planned TAR. Flaring stopped
when depressurization complete.
A flaring event occurred at FS1 starting at 06/01/2013 13:30 and stopping at 06/01/2013 16:00 with a volume of 834
(MSCF). The event lasted for 150 minutes and was due to shutdown of STV/IP 1802 compressor due to fuel gas knockout
drum high level. Flari ng stopped when the compressor was re -loaded.
Please let me know if you have any questions.
Kellie Okonek (alt. Travis Rybicki)
PCCIEOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 382 1370 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akopspcceoctl b .com
Hunt, Jennifer L (DOA)
From:
AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent:
Monday, June 24, 2013 11:22 AM
To:
Hunt, Jennifer L (DOA)
Cc:
Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; Burgess, David H; AK, OPS FS2 Facility OTL; AK, OPS FS2 OSM; AK,
HSSEE Env Adv East
Subject:
Gas flaring events at FS2
To: Jennifer Hunt, AOGCC
iennifer.hunt aaalaska.gov
CC: Dave Roby, AOGCC
dave.robv a)alaska.gov
From: Travis Rybicki, GPB Production Optimization Team Leader
CC: Victoria Ferguson, AOGCC
victoria.ferguson(a alaska.gov
A flaring event occurred at FS2 starting at 06/11/2013 20:45 and stopping at 06/11/2013 22:08 with a volume of 576
(MSCF). The event lasted for 83 minutes. Flaring occurred during the restart of the FS2 facility from a planned outage to
isolate the B Train for planned maintenance. Flaring continued while equipment was started and the plant stabilized
Flaring ended when the plant stabilized and flare valves closed.
A flaring event occurred at FS2 starting at 06/15/2013 11:00 and stopping at 06/15/2013 12:00 with a volume of 438
(MSCF). The event lasted for 60 minutes. Flaring was due to the need to depressure the 4C Common Line during
planned pigging operations. Flaring ended when the depressuring activities associated with the pigging work were
completed, at which time flare valves closed.
A flaring event occurred at FS2 starting at 06/16/2013 16:50 and stopping at 06/16/2013 18:00 with a volume of 468
(MSCF). The event lasted for 90 minutes. Flaring was due to the need to depressure the 4C Common Line during
planned pigging operations. Flaring ended when the depressuring activities associated with the pigging work were
completed, at which time flare valves closed.
Please let me know if you have any questions.
Travis M. Rybicki
PCC-EOC (Production Optimization) Team Lead
Office 907-659-4472 (BOC) 659-5566 (PBOC)
Cell 907-748-2118 Hannony 758-4404
GPB Pager 907-659-5272 # 1890
akoPsPcceoct)()bp.com
Alternate: Kellie Okonek
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL (AKOPSPCCEOCTL@bp.com]
Sent: Sunday, July 07, 2013 6:18 PM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, HSSEE Env Adv East; Burgess, David H; AK, OPS GC1 Facility OTL;
AK, OPS GC1 OSM; AK, OPS FS2 OSM; AK, OPS FS2 Facility OTL; AK, HSSEE Env Adv
West; AK, OPS GC3&PCC OSM; AK, OPS GC3 Facility & Field OTL; AK, OPS FS1 OSM,
AK, OPS FS1 Facility OTL; Kruger, Dale O
Subject: Gas flaring events at GC1, GC3, FSI, FS2
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
4ennifer.hunt(o)alaska.gov dave.robv(a)alaska.gov victoria.ferguson(a)alaska.gov
From: Kellie Okonek, GPB Production Optimization Team Leader
A flaring event occurred at GC1 starting at 06/28/2013 16:30 and stopping at 06/28/2013 18:15 with a volume of 390
(MSCF). The event lasted for 105 minutes and was due to depressurization of spare GILT compressor when EOA Big AL
was loaded. Flaring stopped when depressurization was complete.
A flaring event occurred at GC1 starting at 06/29/2013 17:57 and stopping at 06/29/2013 19:10 with a volume of 10
(MSCF). The event lasted for 73 minutes and was due to start-up test for K-7000 and spin of coppus for cool down.
A flaring event occurred at GC1 starting at 07/05/2013 00:00 and stopping at 07/06/2013 with a volume of 40 (MSCF).
The event lasted for 1440 minutes and was due to flaring during GILT K3300 startup. Flaring stopped when startup
complete.
A flaring event occurred at GC3 starting at 06/29/2013 19:09 and stopping at 06/29/2013 20:10 with a volume of 551
(MSCF). The event lasted for 61 minutes and was due to LPS compressor s/d due to thermocouple deviations and V4
recycle valve UP failure. Flaring stopped when production was curtailed and compressor re -loaded after repairs complete.
A flaring event occurred at FS1 starting at 06/27/2013 20:35 and stopping at 06/27/2013 23:00 with a volume of 604
(MSCF). The event lasted for 145 minutes and was due to unloading of the 1802 STV/IP compressor due to high ambient
temps. Flaring stopped when the alternate 1801 compressor was loaded.
A flaring event occurred at FS1 starting at 06/28/2013 00:01 and stopping at 06/28/2013 01:26 with a volume of 354
(MSCF). The event lasted for 85 minutes and was due to unloading of the 1801 STV/IP compressor due to high ambient
temps. Flaring stopped when the alternate 1802 compressor was loaded..
A flaring event occurred at FS1 starting at 07/01/2013 16:35 and stopping at 07/01/2013 20:20 with a volume of 851
(MSCF). The event lasted for 225 minutes and was due to depressurization of DS12 for planned maintenance. Flaring
stopped when depressure complete.
A flaring event occurred at FS1 starting at 07/07/2013 09:50 and stopping at 07/07/2013 11:30 with a volume of 851
(MSCF). The event lasted for 100 minutes and was due to depressurization of 12-B and 12-C commonlines for removal of
pig launcher and receiver.
A flaring event occurred at FS2 starting at 06/30/2013 00:54 and stopping at 06/30/2013 04:03 with a volume of 929
(MSCF). The event lasted for 189 minutes and was due to depressurization of A -HP, B -HP, MP & A -Treater Flash Drum
for A -train turnaround work. Flaring stopped when the HP oil trains were depressured.
Please let me know if you have any questions.
Kellie Okonek (alt. Travis Rybicki)
PCC/EOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 382 1370 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akopspcceoctlebp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000029
2. Facility Name
PBU FS 2
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
I July -2013
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Q
Pool Name Pool Code Percent
7. Reinjected
O
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
77
9. Flared or vented more than 1 hour (see instr.)
6,485
10. Pilot and Purge
2,513
11. Assist Gas
0
12. Fuel gas used in lease operations.
64,787
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
/ 4os
Y'
MCF
14. TOTAL VOLUME (ITEMS 6.12)
73,862
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0MCF
Waste:
17. Transferred from: CGF
36,129
(P to
Commissioner
18. Transferred to: (Express as a negative #) CGF
-655,151
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
61L�� Note: All volumes must be corrected
Signature ttLLGG Title Mana er Production Taxes and Ro allies Alaska to pressure Of 14.65 psis and to a
I temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date /' AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Events less than or equal to
TOTAL
TIME
O
BP EXPLORATION (ALASKA( INC.
PRUDHOE BAY UNIT- FS -2
GAS FLARING INCIDENT REPORT
July 2013
Not required for unplanned events <= 1 hr
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr
See attachments
TOTAL
0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
7/7/2013 1117-1139
77 See attachments
See attachments
TOTAL
77
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
7/5/2013 0200-0432
6,485 See attachments
See attachments
TOTAL
6,485
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events > 1 Hour
0
Planned Events < 1 hour and not
77
exceeding 5,000 MCF
Planned Events> 1 hour or
6,485
exceeding 5,000 MCF
Pilot Purge
2,513
Assist
0
TOTAL FLARED VOLUME
9,075
Page 5
8/12/2013
2:34 PM
Flare Start Date 07/01/2013
Flare End Date 07/31/2013
FS2 Flare Report Total Volume (MSCF) 6562
Report
Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
13-383 Controlled Biowdown 07/05/2013 2:00:00 am 4:32:00 pm 872 min Yes No Yes BPIUNITCHEB 6485
Determination Cause Depressured Drillsite common lines, C -Train, LPS compressor, STV/IP compressor and Artificial lift to begin tumaround work.
Action Taken Completed depressunng of LP train and artificial lift.
13-384 Controlled Blowdown 07/07/2013 11:17:00 am 11:39:00 am 22 min No No Yes BP1\MITCHEB 77
Determination Cause Depressured fuel gas system to safe out for turnaround
Action Taken Completed depressunng of the fuel gas system.
Total Volume (MSCF) 6562
Generated 08/07/2013 11:29:06AM Page 7 of 11
Hunt Jennifer L (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent: Sunday, July 07, 2013 6:18 PM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, HSSEE Env Adv East; Burgess, David H; AK, OPS GC1 Facility OTL;
AK, OPS GC1 OSM; AK, OPS FS2 OSM; AK, OPS FS2 Facility OTL; AK, HSSEE Env Adv
West; AK, OPS GC3&PCC OSM; AK, OPS GC3 Facility & Field OTL; AK, OPS FSI OSM;
AK, OPS FS1 Facility OTL; Kruger, Dale 0
Subject: Gas flaring events at GC1, GC3, FS1, FS2
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
iennifer.hunt0alaska.gov dave.robyCaalaska.gov victoria.ferquson(dalaska.gov
From: Kellie Okonek, GPB Production Optimization Team Leader
A flaring event occurred at GC1 starting at 06/28/2013 16:30 and stopping at 06/28/2013 18:15 with a volume of 390
(MSCF). The event lasted for 105 minutes and was due to depressurization of spare GLT compressor when EOA Big AL
was loaded. Flaring stopped when depressurization was complete.
A flaring event occurred at GC1 starting at 06/29/2013 17:57 and stopping at 06/29/2013 19:10 with a volume of 10
(MSCF). The event lasted for 73 minutes and was due to start-up test for K-7000 and spin of coppus for cool down.
A flaring event occurred at GCI starting at 07/05/2013 00:00 and stopping at 07/06/2013 with a volume of 40 (MSCF).
The event lasted for 1440 minutes and was due to flaring during GLT K3300 startup. Flaring stopped when startup
complete.
A flaring event occurred at GC3 starting at 06/29/2013 19:09 and stopping at 06/29/2013 20:10 with a volume of 551
(MSCF). The event lasted for 61 minutes and was due to LPS compressor s/d due to thermocouple deviations and V4
recycle valve UP failure. Flaring stopped when production was curtailed and compressor re -loaded after repairs complete.
A flaring event occurred at FS1 starting at 06/27/2013 20:35 and stopping at 06/27/2013 23:00 with a volume of 604
(MSCF). The event lasted for 145 minutes and was due to unloading of the 1802 STV/IP compressor due to high ambient
temps. Flaring stopped when the alternate 1801 compressor was loaded.
A flaring event occurred at FS1 starting at 06/28/2013 00:01 and stopping at 06/28/2013 01:26 with a volume of 354
(MSCF). The event lasted for 85 minutes and was due to unloading of the 1801 STV/IP compressor due to high ambient
temps. Flaring stopped when the alternate 1802 compressor was loaded..
A flaring event occurred at F31 starting at 07/01/2013 16:35 and stopping at 07/01/2013 20:20 with a volume of 851
(MSCF). The event lasted for 225 minutes and was due to depressurization of D812 for planned maintenance. Flaring
stopped when depressure complete.
A flaring event occurred at F31 starting at 07/07/2013 09:50 and stopping at 07/07/2013 11:30 with a volume of 851
(MSCF). The event lasted for 100 minutes and was due to depressurization of 12-B and 12-C commonlines for removal of
pig launcher and receiver.
A flaring event occurred at FS2 starting at 06/30/2013 00:54 and stopping at 06/30/2013 04:03 with a volume of 929
(MSCF). The event lasted for 189 minutes and was due to depressurization of A -HP, B -HP, A -IP & A -Treater Flash Drum
for A -train turnaround work. Flaring stopped when the HP oil trains were depressured.
Please let me know if you have any questions.
Kellie Okonek (alt. Travis Rybicki)
PCCIEOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 382 1370 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akopspcceocti@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPnSITInN
1. Facility Number
0290000029
2. Facility Name
PBU FS 2
3. Field
PBU - EOA
4. Operator
BP
5. Month/Year of Disposition
Au Ust-2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
O
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
gg
9. Flared or vented more than 1 hour (see instr.)
258
10. Pilot and Purge
12,407
11. Assist Gas
0
12. Fuel gas used in lease operations.
206,338
13. Other (see instructions)
0
Official Use Only
Authorization >7 hr:
Safety
a T �
l
MCF
14. TOTAL VOLUME (ITEMS 6-12)
219,102
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
108,495
/ ! _ "
`fb Uaate
Commissioner
18. Transferred to: (Express as a negative #) CGF
-1,998 ,591
19. Remarks.
I hereby certify that.11bf foregoing is true and correct to the best of my knoviledge.
�/ n
�f^Note: All volumes must be corrected
Signature 'L� l�'Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date '—1 AAC25.235.
vIr
(13 / 1A -
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -2
GAS FLARING INCIDENT REPORT
August 2013
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
8/16/2013 0100-0145
26 Not required for unplanned events <= 1 hr
Not required for unplanned events <= 1 hr
8/25/2013 0200-0245
73
TOTAL
99
Unplanned Events greater than 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
8/17/2013 1657-1845
240 See attachments
See attachments
TOTAL
240
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
TOTAL
0
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
8/31/2013 1531-1750
18 See attachments
See attachments
TOTAL
18
TOTAL
Unplanned Events < 1 Hour
99
Unplanned Events> 1 Hour
240
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events> 1 hour or
18
exceeding 5,000 MCF
Pilot Purge
12,407
Assist
0
TOTAL FLARED VOLUME
12,764
Page 4
9/12/2013
3:32 PM
Flare StartDate 08/01/2013
Flare End Date 08/31/2013
FS2 Flare Report
Total Volume (MSCF) 357
Report
Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
13-418 Controlled Blowdown 08/17/2013 4'57:00 pm 6:45'.00 pm 108 min No
Determination Cause S/I commonline 9A and depressured.
Action Taken Completed tlepressunng of commonline.
No No BP1\RALPHJM 240
13-441 Controlled Blowdown 08/31/2013 3:3100 pm 5:50:00 pm 139 min No No
Determination Cause T\C shutdown for planned maintenance
Depressured 16"D" to remove Pig Launcher/Receiver Post Smart Pigging.
Action Taken Completed tlepressunng.
Yes BP1\REIMBT 18
Total Volume (MSCF) 357
Generated 09/04/2013 10.13.15AM Page 4 of 12
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPnSiTinN
1. Facility Number
0290000029
2. Facility Name
PBU FS 2
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
I September -2013
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
1,010
9. Flared or vented more than 1 hour (see mall.)
1,085
10. Pilot and Purge
13,924
11. Assist Gas
0
12. Fuel gas used in lease operations.
431,795
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
/ d Q
{ !J
MCF
14. TOTAL VOLUME (ITEMS 6-12)
447,814
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
227,882
_/ `/
11..00 Commissioner Date J
18. Transferred to: (Express as a negative #) CGF
-9,972,321
19. Remarks:
I hereby certify that the foregoing is true and
�c�olrrect to the best of my knowledge.
Signature Wy Manr ProductioNote: All volumes must be corrected
Title a en Taxes and Ro aloes Alaska to pressure of 14.65 psia and to a
I temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Dale l ! S AAC25.235.
VL f --
61311,4 -
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -2
GAS FLARING INCIDENT REPORT
September 2013
DESCRIPTION OF INCIDENT & CAUSE
Not required for unplanned events <= 1 hr
Not required for unplanned events <= 1 hr
TOTAL
0
9/16/2013 0100-0300
206 See attachments
Unplanned Events greater than 1 hour
479
9/24/2013 0120-0320
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
TOTAL
Unplanned Events <1 Hour
See attachments
See attachments
TOTAL
0
1,010
exceeding 5,000 MCF
Planned Events Less Than or Equal 1
Hour AND <=
5,000 mcf
exceeding 5,000 MCF
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
9/24/2013 0845-0945
180
See attachments
See attachments
9/25/2013 0800-0900
180
9/26/2013 0750-0845
180
9/27/2013 0315-0345
110
9/27/2013 1020-1055
180
9/28/2013 0823-0850
180
TOTAL
1,010
UADm nmE
VOLUME DESCRIPTION OF IN
9/16/2013 0100-0300
206 See attachments
9/23/2013 2030-2330
479
9/24/2013 0120-0320
400
TOTAL
1,085
TOTAL
Unplanned Events <1 Hour
0
Unplanned Events> 1 Hour
0
Planned Events <1 hour and not
1,010
exceeding 5,000 MCF
Planned Events> 1 hour or
1,085
exceeding 5,000 MCF
Pilot Purge
13,924
Assist
0
TOTAL FLARED VOLUME
16,019
See attachments
Page 4
10/11/2013
8:58 AM
Flare Start Date 09/012013
Flare End Date 09/302013
FS2 Flare Report
Total Volume (MSCF) 2095
Report
Numbe System Date StartTime Stop Time Duration Intermittent
Black Smoke Planned Reported By Volume
13489 Controlled Blowdown 09/162013 1:00:00 am 3:00:00 am 120 min No
No Yes BP1\RALPHJM 206
Determination Cause Depressured C/L 3D for UR installs for pigging.
Action Taken Completed depressuring.
13-486 Controlled Blowdown 09/23/2013 8:30:00 pm 11:30:00 pm 180 min No
No Yes BP1\BARKERJ 479
Determination Cause -RC shutdown for planned maintenance
Action Taken 9E Common line brought down to depressors DS9 to swap blinds.
13-487 Controlled Blowdown 09/242013 1:20:00 am 3:20:00 am 120 min No
No Yes BP1\BARKERJ 400
Determination Cause Depressured C/L 9A for pipeline work in support of 9A
Action Taken Completed depressuring of C/L
13-487 Controlled Blowdown 09/24/2013 8:45:00 am 9:45:00 am 60 min No
No Yes BP1\RALPHJM 180
Determination Cause Depressured C/L 4C for piepleine work -Anchor inspection.
Action Taken Completed depressuring.
13-488 Controlled Blowdown 09/25/2013 8:00:00 am 9:00:00 am 60 min No
No No BP1\RALPHJM 180
Determination Cause Depressured C/L 4C for inspection work -anchor block.
Action Taken Completed depressuring.
13-491 Controlled Blowdown 09/26/2013 7:50:00 am 8:45:00 am 55 min No
No Yes BP1\REIMBT 180
Determination Cause Depressured CUD" for anchor work.
Action Taken Completed depressuring.
13-495 Controlled Blowdown 09/27/2013 3:15:00 am 3:45:00 am 30 min No
No Yes BP1\REIMBT 110
Determination Cause Depressured 3" D" commonline to remove Smart Pig Launcher/Receiver.
Action Taken Completed depressuring.
13-495 Controlled Blowdown 0927/2013 10:20:00 am 10:55:00 am 35 min No
No Yes BP1\REIMBT 180
Determination Cause 4"C/D" was depressured for anchor work and a line lift.
Action Taken Completed depressuring.
13497 Controlled Blowdown 09/28/2013 8:23:00 am 8:50:00 am 27 min No
No Yes BP1\REIMBT 180
Determination Cause 04"C/D" common line depressured for Line Lift, Anchor work and line inspection.
Action Taken Completed depressuring.
Total Volume (MSCF) 2095
Generated 10102/2013 9:20:43AM Page 4 of 10
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL (AKOPSPCCEOCTL@bp.com]
Sent: Sunday, September 01, 2013 2:31 PM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; Kruger, Dale O; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; AK,
HSSEE Env Adv West; AK, OPS FS3 OSM; AK, OPS FS3 Facility OTL; Burgess, David H;
AK, HSSEE Env Adv East; AK OPS FS2 Facility OTL; AK, OPS FS2 OSM
Subject: Gas flaring events at GC1jM FS3
To: Jennifer Hunt, AOGCC
iennifer.hunt(a alaska.gov
CC: Dave Roby, AOGCC
dave.robv(@alaska.gov
From: Kellie Okonek, GPB Production Optimization Team Leader
CC: Victoria Ferguson, AOGCC
victoria.ferouson (a)alaska.00v
A flaring event occurred at FS2 starting at 08/31/2013 15:31 and stopping at 08/31/2013 17:50 with a volume of 18
(MSCF). The event lasted for 139 minutes and was due to depressurization of 16D commonline for planned removal of
temporary pigging facilities. Flaring stopped when depressurization complete.
A flaring event occurred at GC1 starting at 08/26/2013 11:05 and stopping at 08/26/2013 16:35 with a volume of 320
(MSCF). The event lasted for 330 minutes and was due to swapping of GLT machines for water washes. Flaring stopped
when water washes complete.
A flaring event occurred at FS3 starting at 08/26/2013 14:50 and stopping at 08/26/2013 15:45 with a volume of 9329
(MSCF). The event was a black smoke event. The event had a volume greater than 5000 (MSCF) and was due to a
power outage that caused loss of T/C's 1801, 1803, & 1806 in addition to the water section, regens shipping pump, etc.
Flaring stopped when the turbine/compressors were started and re -loaded after getting generator power established.
Please let me know if you have any questions.
Kellie Okonek (alt. Travis Rybicki)
PCC/EOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 382 1370 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akopspcceoctl(abo.com
Hunt, Jennifer L (DOA
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj
Sent: Wednesday, September 25, 2013 10:49 PM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; Kruger, Dale O; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; AK,
HSSEE Env Adv West; AK, OPS GC3 Facility & Field OTL; AK, OPS GC3&PCC OSM; AK,
OPS FS3 OSM; AK, OPS FS3 Facility OTL; Burgess, David H; AK, HSSEE Env Adv East; AK,
OPS PCC EOC TL; AK, OPS FS2 OSM; AK, OPS FS2 Facility OTL
Subject: Gas flaring events at GC1, GC3,IMFS3
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson,
AOGCC
iennifer hunt(oalaska.gov dave robvCDalaska.gov
victoria. ferq usonaalaska.gov
From: Kellie Okonek, GPB Production Optimization Team Leader
A flaring event occurred at FS2 starting at 09/24/2013 01:00 and stopping at 09/24/2013 03:00 with a volume of 214
(MSCF). The event lasted for 120 minutes, and was due to depressurization of 9A commonline for repairs. Flaring
stopped when line depressured.
A flaring event occurred at FS2 starting at 09/23/2013 20:30 and stopping at 09/23/2013 23:30 with a volume of 479
(MSCF). The event lasted for 180 minutes, and was due to DS9E commonline coming down to swap blinds.
A flaring event occurred at FS3 starting at 09/22/2013 14:20 and stopping at 09/22/2013 15:40 with a volume of 60
(MSCF). The event lasted for 80 minutes, and was due to depressurization of 6D commonline to install a pig launcher.
Flaring stopped when line depressured.
A flaring event occurred at GC1 starting at 09/18/2013 02:20 and stopping at 09/18/2013 15:00 with a volume of 220
(MSCF). The event lasted for 760 minutes, and was due to scheduled water wash on K7001.
A flaring event occurred at GC3 starting at 09/18/2013 00:01 and stopping at 09/18/2013 02:00 with a volume of 413
(MSCF). The event lasted for 119 minutes, and was due to wet gas compressor shutdown due to control instrumentation
failure. Flaring stopped when WOA production was decreased.
A flaring event occurred at GC3 starting at 09/17/2013 20:02 and stopping at 09/18/2013 with a volume of 826 (MSCF).
The event lasted for 238 minutes, and was due to wet gas compressor shutdown due to control/instrumentation failure.
Flaring stopped when WOA production was decreased.
A flaring event occurred at FS3 starting at 09/17/2013 14:14 and stopping at 09/17/2013 15:51 with a volume of 74
(MSCF). The event lasted for 97 minutes, and was due to depressurization of 6B for the make-piggable project.
A flaring event occurred at GC1 starting at 09/16/2013 03:00 and stopping at 09/16/2013 22:30 with a volume of 6070
(MSCF). The event lasted for 1170 minutes. The event had a volume greater than 5000 (MSCF) and was due to
depressurization of GT -13 in support of line lifts for inspection.
Please let me know if you have any questions.
Kellie Okonek (alt. Travis Rybicki)
PCCIEOC Production optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 382 1370 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akoosycceoctl(a)by com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number2.
0290000029
Facility Name
PBU FS 2
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
October -2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
�
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
720
9. Flared or vented more than 1 hour (see instrt
828
10. Pilot and Purge
14,830
11. Assist Gas
3,228
12. Fuel gas used in lease operations.
570,647
13. Other (see instructions)
U
Official Use Only
Authorization>1 h[
Safety
� ��
MCF
14. TOTAL VOLUME (ITEMS 6-12)
590,353
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
U
Waste:
MCF
17. Transferred from: CGF
253,789
Comrtfssioner Date
18. Transferred to: (Express as a negative #) CGF
-13,860,369
19. Remarks:
I hereby certify that the foregoing is true andcorrect to the best of my knowledge.
y� / `y /q//l� A Note: All volumes must be corrected
Signature_ � i l ;i=Y /Y Title Manager Production Taxes and Ro aloes Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
rz_ F
&131 j4 -
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Events less than oreoualto 1 hour
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -2
GAS FLARING INCIDENT REPORT
October 2013
Not required for unplanned events <= 1 hr
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr
TOTAL 0
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT &CAUSE ACTION TAKEN TO ELIMINATE CAUSE
10/25/2013 1030-1050 720 See attachments See attachments
TOTAL 720
10/5/2013 0150-0400
262 See attachments
10/5/2013 0515-0630
256
10/25/2013 0045-0205
410
TOTAL
928
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events > 1 Hour
0
Planned Events < 1 hour and not
720
exceeding 5,000 MCF
Planned Events> 1 hour or
928
exceeding 5,000 MCF
Pilot Purge
14,830
Assist
3,228
TOTAL FLARED VOLUME
19,706
See attachments
Page 5
11/12/2013
2:18 PM
Flare Start Date 10/01/2013
Flare End Date 10/31/2013
FS2 Flare Report Total Volume (MSCF) 1648
Report
Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
13-512 Controlled Blowdown 10/05/2013 1:50:00 am 4:00:00 am 130 min No No Yes BPI\REIMBT 262
Determination Cause Depressured 09 "E" common line for 09 "A" Smart Pig Launcher/Receiver Removal.
Action Taken Completed depressuring.
13-512 Controlled Blowdown 10/05/2013 5:15:00 am 6:30:00 am 75 min No No Yes BP1\REIMBT 256
Determination Cause Depressured 09"A" Common line for the Smart Pig Launcher/Receiver removal from 09"A".
Action Taken Completed depressuring.
Daily Volume (MSCF) 518
13-546 Controlled Blowdown 10/25/2013 12:45:00 am 2:05:00 am 80 min No No Yes BPi\MITCHEB 410
Determination Cause Shutdown both 1801, 1803, 1804. Depressured A HP, B HP and B S/C to remove blind from C S/C.
Action Taken Completed depressurmg.
13-546 Controlled Blowdown 10/25/2013 10:30:00 am 10:50:00 am 20 min No No Yes BP1WlTCHEB 720
Determination Cause Extended flaring event occurred while awaiting operator/maintenance evaluation for acoustic leak test of FV1506. This was planned to help
CCP plan for future TAR work.
Action Taken Completed depressuring for acoustic leak test of FV1506.
Daily Volume (MSCF) 1130
Total Volume (MSCF) 1648
Generated 11/04/2013 3:38:24PM Page 7 of 13
Hunt Jennifer L (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent: Tuesday, October 15, 2013 10:26 AM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; Burgess, David H; AK, OPS FS2 Facility OTL; AK, OPS FS2 OSM; AK,
HSSEE Env Adv East
Subject: Gas flaring events aWWAS
To: Jennifer Hunt, AOGCC
iennifer.hunt(d)alaska.00v
CC: Dave Roby, AOGCC
dave.roby a alaska.gov
From: Travis Rybicki, GPB Production Optimization Team Leader
CC: Victoria Ferguson, AOGCC
victoria.ferouson(o)alaska.aov
A flaring event occurred at FS2 starting at 10/05/2013 01:50 and stopping at 10/05/2013 04:00 with a volume of 262
(MSCF). The event lasted for 130 minutes. Flaring was due to planned depressuring of Common Line 9E in support of
planned removal of a pig launcher/receiver barrel on Common Line 9A. Flaring ended when C/L 9E depressuring
activities were complete and flare valves closed.
A flaring event occurred at FS2 starting at 10/05/2013 05:15 and stopping at 10/05/2013 06:30 with a volume of 256
(MSCF). The event lasted for 75 minutes. Flaring was due to planned depressuring of Common Line 9A in support of
planned removal of a pig launcher/receiver barrel on Common Line 9A. Flaring ended when C/L 9A depressuring
activities were complete and flare valves closed.
Please let me know if you have any questions.
Travis M. Rybicki
PCC-EOC (Production Optimization) Team Lead
Office 907-659-4472 (BOC) 659-5566 (PBOC)
Cell 907-748-2118 Harmony 758-4404
GPB Pager 907-659-5272 * 1890
akopsocceoctl(fti). Com
Alternate: Kellie Okonek
Hunt, Jennifer L (DOA
From:
AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com)
Sent:
Saturday, October 26, 2013 6:20 PM
To:
Hunt, Jennifer L (DOA)
Cc:
Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, OPS PCC EOC TL; AK, OPS CGF OTL; AK, OPS CCP CGF OSM; AK,
OPS GCI Facility OTL; AK, OPS GC1 OSM; Kruger, Dale O; O'Riordan, Colm J; Burgess,
David H; AK, OPS FS2 OSM; AK, OPS FS2 Facility OTL; AKHSSEEEnvAdvWest@bp.com;
AK, HSSEE Env Adv East; AK, HSSEE Env Adv Central
Subject:
Gas flaring events at CGF, GC1
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson,
AOGCC
jen nifer. h untCaM laska. gov dave. robv(&alaska.aov
victoria. ferouson(calaska. aov
From: Kellie Okonek, GPB Production Optimization Team Leader
A flaring event occurred at FS2 starting at 10/25/2013 00:45 and stopping at 10/25/2013 02:05 with a volume of 410
(MSCF). The event lasted for 80 minutes and was due to shutdown both 1801, 1803, 1804 and depressurization of A HP,
B HP and B S/C to remove blind from C S/C. Flaring stopped when depressurization for their plant shutdown was
complete.
A flaring event occurred at FS2 starting at 10/25/2013 10:30 and stopping at 10/25/2013 10:50 with a volume of 720228
(MSCF). The event had a volume greater than 5000 (MSCF) and was due to extended flaring event occurred while to
support planned acoustic testing of FV -1506.
A flaring event occurred at CGF starting at 10/23/2013 10:21 and stopping at 10/23/2013 14:25 with a volume of 34024
(MSCF). The event lasted for 244 minutes. The event had a volume greater than 5000 (MSCF) and was due to T/C 1855
Shutdown BESD on Low Seal Oil DP. Flaring stopped when offline 1805 T/C was started.
A flaring event occurred at GC1 starting at 10/23/2013 10:15 and stopping at 10/23/2013 15:15 with a volume of 67000
(MSCF). The event was a black smoke event. The event lasted for 300 minutes. The event had a volume greater than
5000 (MSCF). Approximately 1/3 of the GC1 facility (LPS, WSW, & PWX) lost all power simultaneously. The loss of
power resulted in the gas compressor cooling fans (gas/utility water), and instrument air going down. Soon after this
occurred the LPS and GILT compressors were shutdown in a controlled fashion by the board operator. The loss of these
compressors resulted in a flaring event.
A flaring event occurred at GC1 starting at 10/19/2013 00:00 and stopping at 10/19/2013 14:30 with a volume of 3022
(MSCF). The event lasted for 870 minutes and was due to.
A flaring event occurred at GC1 starting at 10/18/2013 18:00 and stopping at 10/19/2013 with a volume of 3 (MSCF). The
event lasted for 360 minutes and was due to lowering of rates on the LP/IP compressor KO to prevent black smoke.
Please let me know if you have any questions.
Kellie Okonek (alt. Travis Rybicki)
PCC/EOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 382 1370 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akopspcceoctl(a)bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000029
2. Facility Name
PBU FS 2
3. Field
PBU - EOA
4. Operator
BP
5. MonthPfear of Disposition
I November -2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume,
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
O
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
442
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
13,078
11. Assist Gas
238
12. Fuel gas used in lease operations.
709,310
13. Other (see instructions)
0
Official Use Only
Authorization >7 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
723,068
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
()
Waste:
MCF
17. Transferred from: CGF
301,193
18. Transferred to: (Express as a negative #) CGF
-14,663,700
Commissioner Date
19. Remarks:
I hereby certify that a foregoin is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature G1pJ K Title Manager Production Taxes and Ro Ities Alaska to pressure 114.65 psis and to a
/ temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 DateAAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000029
2. Facility Name
PBU FS 2
3. Field
PBU - EOA
4. Operator
BP
5. Month/Year of Disposition
December -2013
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name PoolCode Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
B. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
14,215
11. Assist Gas
22
12. Fuel gas used in lease operations.
805,946
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
820,183
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
p
Waste:
MCF
17. Transferred from: CGF
352,221
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-16,526,'00 06
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Mana er Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
60-4
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate