STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000030
2. Facility Name
PBU FS 3
3. Field
PBU - EOA
4. Operator
BP
5. Monthlyear of Disposition
I January -2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Cade Percent
7. Reinjected
O
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
3,799
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
22,230
11. Assist Gas
11
12. Fuel gas used in lease operations.
909,218
13. Other (see instructions)
0
Official Use Only
Authorization >i hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
935,258
Lease Use
MCF
15. NGL Gas Equivalent
U
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from: CGF
931,448
Commissioner Date
18. Transferred to: (Express as a negative #)CGF
-29,994,476
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
�/J viA Note: All volumes must be corrected
Signature_ IUU//// ddPP lit C! Title Mana er Production Taxes and Ro alties Alaska to pressure of 14.65 psia and to a
i 2 temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date /-� AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -3
GAS FLARING INCIDENT REPORT
January 2013
Unplanned Events less than or equal to
1 hour
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
1/5/2013
1705-1801
2,385 Not required for unplanned events <= 1 hr Not required for unplanned events <=1 hr
1/18/2013
2130-2135
3
1/18/2013
2155-2200
3
1/20/2013
0505-0510
3
1/20/2013
1620-1715
633
1/25/2013
1010-1015
3
1/25/2013
1900-2000
630
1/25/2013
1900-1905
3
1/25/2013
1910-1915
3
1/25/2013
1920-1925
3
TOTAL
3,669
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
1/3/2013 0520-0600 124 See attachments See attachments
1/25/2013 1310-1315 3
1/26/2013 1620-1625 3
TOTAL 130
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO EUMINATE CAUSE
See attachments See attachments
TOTAL
Page 5
2/13/2013
46 PM
TOTAL
Unplanned Events. 1 Hour
3,669
Unplanned Events> 1 Hour
0
Planned Events< l hour and not
130
exceeding 5,000 MCF
Planned Events> 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
22,230
Assist
11
TOTAL FLARED VOLUME
26,040
Page 5
2/13/2013
46 PM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000030
2. Facility Name
PBU FS 3
3. Field
PBU - EOA
4. Operator
BP
5. Month/Year of Disposition
February -2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume,
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
B. Flared or vented 1 hour or less
578
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
20,073
11. Assist Gas
2,486
12. Fuel gas used in lease operations.
864,744
13. Other (see instructions)
0
Official Use Only
Authorization >11 hr:
Safety
MCP
14. TOTAL VOLUME (ITEMS 6.12)
887,881
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from: CGF
884,817
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-28,306,200
19. Remarks:
I hereby certify that a foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Manager Production Taxes and Ro al ies Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Dale 4146 AAC25.235,
Form 10-422 Rev. M009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -3
GAS FLARING INCIDENT REPORT
February 2013
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
2/1/2013 0415-0453 211 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
2/1/2013 0547-0631 141
2/3/2013 1444-1522 214
TOTAL 566
VOLUME DESCRIPTION OF IN
See attachments
See attachments
TOTAL 0
TOTAL
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
566
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
2/3/2013 2020-2025 3 See attachments
See attachments
2/11/2013 1300-1310 3
2/21/2013 1106-1111 3
0
2/21/2013 1725-1730 3
TOTAL 12
20,073
Planned Events Exceeding 1 Hour OR > 5,000 mcf
2,456
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
TOTAL 0
Page 5
3/13/2013
9:52 AM
TOTAL
Unplanned Events < 1 Hour
566
Unplanned Events> 1 Hour
0
Planned Events < 1 hour and not
12
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
20,073
Assist
2,456
TOTAL FLARED VOLUME
23,137
Page 5
3/13/2013
9:52 AM
McMains, Stephen E (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent: Sunday, February 24, 2013 1:58 PM
To: Ferguson, Victoria L (DOA); Regg, James B (DOA); McMains, Stephen E (DOA)
Cc: AK, OPS FS3 OSM; Burgess, David H; Benson, Gary A; Leonard, Sean A; Arthur, Gregory;
AK, HSSEE Env Adv East; AK, HSSEE Env TL (North Slope); AK, OPS PCC EOC TL; AK,
OPS FS3 Facility OTL
Subject: FS3 Skid 50 uncontrolled release 5 day report
Victoria Ferguson, Jim Regg & Stephen McMains,
This is a follow-up to the courtesy verbal/email notifications made 2/19/13 to the North Slope and Anchorage AOGCC
offices.
Please find enclosed the 5 -day report for the release which occurred at the Skid 50 NGL Module 4984 on 2/19/13. This
was also faxed to 907-276-7542.
Please give me a call if you have further questions. A 30 -day report will be provided after completion of the incident
investigation.
Regards,
Travis M. Rybicki
PCC-EOC (Production Optimization) Team Lead
Office 907-659-4472 (BOC) 659-5566 (PBOC)
Cell 907-748-2118 Harmony 758-4404
GPB Pager 907-659-5272 # 1890
akoasocceoctl(cbD. com
Alternate: Kellie Okonek
AOGCC 5 -day gas
report FS3 Ski...
BP Exploration (Alaska) Inc.
P.O. Box 196612, Anchorage, AK 99519-6612
REPORT OF ACCIDENTAL GAS RELEASE
(5 -day and 30 -day report)
Date: 24 February 2013
For All Releases To:
Chairman
Alaska Oil and Gas Conservation Commission
333 W. 7fh Ave, Suite
Anchorage, AK 99501-3539
Fax: 276-7542
DESCRIPTION OF INCIDENT—Skid 50 Module 4984 NGLs illlrelease on metering skid
1.
Date and Time: 19 February 2013 @ 0917
2.
Location:
Detailed Location
__A
_Prudhoe Bay Unit
Skid 50 Module 4984
_Endicott
_Milne
Point
_Badami
Northstar
Other
3.
Volume of natural gas lost:
583 scf NGL vapour 192 gallons of liquid NGL
4.
Cause of loss:
A loss of primary containment (LOPC) occurred during
maintenance preparation for planned work on the LACT
NGL meter Prover located in Module 4984 at Skid 50.
5.
Actions taken and planned to prevent
The fire and gas (F&G) system acted per design, closing
further loss:
the NGL system associated battery limit valves and source
was controlled. Halon system discharged as designed for
cause. Actions were taken on supply and delivery lines to
limit source and pressure to leak location. Incident was
managed as a Tier I event. Once de-escalated, skid entry
was made, with associated clean-up and ventilation
activities. Prior to restart of the NGL skid, a F&G system
functional test was performed. Operations executed a
thorough joint integrity survey before start up. Halon
system was replenished prior to start up. The actual cause
of the incident is currently under investigation.
6.
Equipment or procedural changes to
Pending investigation findings. Investigation will review
prevent loss from recurring:
equipment and procedural aspects of the incident.
7.
Contact Name and telephone number).
Travis M. R bicki 907-659-4472
Signature:
a�
cc: Jim Regg, AOGCC
Stephen McMains, AOGCC
Tom Maunder, AOGCC
BPX Air Quality Technical Authority MB, 11-6 (Fax: 564-5020)
BPX Volume Accounting MB, 12-4 (Fax: 56411094)
BPX Planning and Performance Manager, MB 380D
East Area Operations Manager, PRB-10
Production Optimization Team Leader, F-1
McMains, Stephen E (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj
Sent: Monday, April 15, 2013 11:21 AM
To: Ferguson, Victoria L (DOA); Regg, James B (DOA); McMains, Stephen E (DOA)
Cc: Burgess, David H; AK, OPS FS3 OSM; AK, OPS FS3 Facility OTL; Leonard, Sean A; Benson,
Gary A; Arthur, Gregory; AK, HSSEE Env Adv East; AK, HSSEE Env TL (North Slope); AK,
OPS PCC EOC TL
Subject: FS3 Skid 50 uncontrolled release 30 day report
Attachments: FS3 skid 50 uncontrolled release AOGCC 30 day report.pdf
Victoria Ferguson, Jim Regg & Stephen McMains,
This is a follow-up to the 5 -day report submitted on 2/14/13. Please find the enclosed 30 -day report for the
release which occurred at the Skid 50 NGL Module 4984 on 2/19/13.
Please give me a call if you have further questions.
Thanks,
Kellie Okonek (alt. Travis Rybicki)
PCC/EOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 382 1370 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akopspcceoctl(d)bp.com
From: AK, OPS PCC EOC TL
Sent: Thursday, March 21, 2013 4:54 PM
To: victoria.ferguson(abalaska.gov
Subject: RE: FS3 Skid 50 uncontrolled release 5 day report
Victoria,
I realize the 30 day report for this event was due today. The incident investigation was completed today so it
will take a few more days to receive the report and complete the 30 day report.
We will transmit the 30 day report as soon as feasible. I apologize for the late notice — I returned Tuesday and
was just informed late yesterday the investigation was wrapping up today.
Regards,
Travis M. Rybicki
PCC-EOC (Production Optimization) Team Lead
Office 907-659-4472 (BOC) 659-5566 (PBOC)
Cell 907-748-2118 Harmony 758-4404
GPB Pager 907-659-5272 # 1890
a kopspcceoctl Ca) b P. Com
Alternate: Kellie Okonek
From: AK, OPS PCC EOC TL
Sent: Sunday, February 24, 2013 1:58 PM
To: Ferguson, Victoria L (DOA); 'Regg, James B (DOA)'; 'McMains, Stephen E (DOA)'
Cc: AK, OPS FS3 OSM; Burgess, David H; Benson, Gary A; Leonard, Sean A; Arthur, Gregory; AK, HSSEE Env Adv East;
AK, HSSEE Env TL (North Slope); AK, OPS PCC EOC TL; AK, OPS FS3 Facility OTL
Subject: FS3 Skid 50 uncontrolled release 5 day report
Victoria Ferguson, Jim Regg & Stephen McMains,
This is a follow-up to the courtesy verbal/email notifications made 2/19/13 to the North Slope and Anchorage
AOGCC offices.
Please find enclosed the 5 -day report for the release which occurred at the Skid 50 NGL Module 4984 on 2/19/13. This
was also faxed to 907-276-7542.
Please give me a call if you have further questions. A 30 -day report will be provided after completion of the incident
investigation.
Regards,
Travis M. Rybicki
PCC-EOC (Production Optimization) Team Lead
Office 907-659-4472 (BOC) 659-5566 (PBOC)
Cell 907-748-2118 Harmony 758-4404
GPB Pager 907-659-5272 # 1890
a koPsPcceoctl (a)bo. co m
Alternote: Kellie Okonek
BP Exploration (Alaska) Inc.
P.O. Box 196612, Anchorage, AK 99519-6612
REPORT OF ACCIDENTAL GAS RELEASE
(30 -day report)
Date: 15 April 2013
For All Releases To:
Chairman
Alaska Oil and Gas Conservation Commission
333 W. 7" Ave, Suite
Anchorage, AK 99501-3539
Fax: 276-7542
DESCRIPTION OF INCIDENT— Skid 50 Module 4984 NGLs ill/release on metering skid
1. Date and Time: 19 February 2013 @ 0917
2. Location:
Detailed Location
_X_Prudhoe Bay Unit
Skid 50 Module 4984
_Endicott
_Milne Point
_Badami
Northstar
Other
3. Volume of natural gas lost:
583 scf NGL vapour 192 gallons of liquid NGL
4. Cause of loss:
A loss of primary containment (LOPC) occurred during
maintenance preparation for planned work on the LACT
NGL meter (Prover) located in Module 4984 at Skid 50.
Operators failed to follow the steps outlined in their
procedure, opening a valve on a hose prior to the hose
beinq connected at its other end.
5. Actions taken and planned to prevent
The fire and gas (F8G) system acted per design, closing
further loss:
the NGL system associated battery limit valves and source
was controlled. Halon system discharged as designed for
cause. Actions were taken on supply and delivery lines to
limit source and pressure to leak location. Incident was
managed as a Tier I event. Once de-escalated, skid entry
was made, with associated clean-up and ventilation
activities. Prior to restart of the NGL skid, a F8G system
functional test was performed. Operations executed a
thorough joint integrity survey before start up. Halon
system was replenished prior to start up. The actual cause
of the incident was part of a formal incident investigation
process. Key findings/action items noted below will be
progressed to prevent further losses from subsequent
similar maintenance activities.
6. Equipment or procedural changes to
The investigation team recommends the following:
prevent loss from recurring:
• A permanent engineered piping system will be installed
to eliminate the potential for LOPC events when
performing future maintenance activities of the scope
that caused the incident
a Maintenance procedures will be reviewed and revised
to further raise awareness during subsequent
maintenance activities.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000030
2. Facility Name
PBU FS 3
3. Field
PBU - ECA
4. Operator
BP
5. MontivYear of Disposition
March -2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume,
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
O
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
268
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
21,752
11. Assist Gas
68
12. Fuel gas used in lease operations.
954,889
13. Other (see instructions)
0
Official Use Only
Authorization >t hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
976,977
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
976,641
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-27,027,254
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
/7M� �nyApn� Note: All Volumes must be corrected
Signature ,�� c'/ / i(..(1](�i%/� Title Mana er Production Taxes and,Royplties Alaska to pressure of 14.65 psis and to a
I / /Uh temperature of 60o F. Authority 20
Printed Name Diane Colley`Y' Phone (907) 564-5775 Datell� AAC25.235.
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -3
GAS FLARING INCIDENT REPORT
March 2013
Events less than or eaual to 1
Not required for unplanned events <= 1 hr
TOTAL 0
See attachments
Not required for unplanned events <= 1 hr
See attachments
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT& CAUSE ACTION TAKEN TO ELIMINATE CAUSE
3/10/2013 1436-1438 268 See attachments See attachments
TOTAL 268
TOTAL
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
D,
TOTAL
0
0
268
0
21,752
68
22,088
See attachments
ACTION TAKEN TOE
See attachments
Page 5
4/10/2013
1:30 PM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000030
2. Facility Name
PBU FS 3
3. Field
PBU - EOA
4. Operator
BP
5. MonthlYear of Disposition
April -2013
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
11
9. Flared or vented more than 1 hour (see instr.)
9
10. Pilot and Purge
21,091
11. Assist Gas
828
12. Fuel gas used in lease operations.
909,036
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safely
�
MCF
14. TOTAL VOLUME (ITEMS 6-12)
930,775
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
p
Waste:
MCF
17. Transferred from: CGF
926,796
-/3
18. Transferred to: (Express as a negative #) CGF
-28,695,727
Commissioner Date
19. Remarks:
I hereby certify that IN foregoing is We and correct to the best of my knowledge.
,r Note: All volumes must be corrected
Signature [ CffA Title Mana er Production Taxes and Ro allies Alaska to pressure of 14.65 Asia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
lrL�
G /12� l3
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -3
GAS FLARING INCIDENT REPORT
April 2013
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
4/22/2013 0511-0611 8 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 8
See attachments
See attachments
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
4/2/2013 0422-0427 3 See attachments See attachments
TOTAL 3
DATE
4/25/2013
1014-1229
TOTAL
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
9 See attachments
9
TOTAL
8
0
3
9
21,091
628
21,739
CAUSE
See attachments
Page 7
5/14/2013
10:22 AM
Flare StartOate 04/01/2013
Flare End Date 04/30/2013
FS3 Flare Report
Total Volume (MSCF) 20
Report
Numbe
System Date
Start Time
Stop Time
Duration Intermittent
Black Smoke Planned
Reported By
Volume
13-155
Controlled Blowdown 04/02/2013
4:22:00 am
4:27:00 am
5 min No
No Yes
BP1\DONATR
3
Determination Cause Normal stop of 1802 compressor
Action Taken Completed shutdown.
13-208 Controlled Blowdown 04/25/2013 10:14:00 am 12:29:00 pm 135 min Yes
Determination Cause 1801 had one failed start attempt before putting on line.
1802 was manually shut down after loading 1801.
Action Taken Normal depressure of case upon shutdown.
No Yes BP1\GARSKEH 9
Total Volume (MSCF) 20
Generated 05/07/2013 9:39:07AM Page 6 of 12
Hunt, Jennifer L (DOA
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent: Tuesday, April 30, 2013 12:37 PM
To: McMains, Stephen E (DOA); Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, OPS FS3 Facility OTL; AK, OPS FS3 OSM; AK, HSSEE Env Adv East;
Burgess, David H
Subject: Gas flaring events at FS3
To: Jennifer Hunt, AOGCC
L nifer.huntaalaska.00v
CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
dave.robyna alaska.00v victoria.ferguson(U)alaska.aov
From: Travis Rybicki, GPB Production Optimization Team Leader
A flaring event occurred at FS3 starting at 04/22/2013 05:11 and stopping at 04/22/2013 06:11 with a volume of 8
(MSCF). The event lasted for 60 minutes and was due to shut down of STV/IP T/C 1801 due to control/instrumentation
failure. Three start attempts were made before T/C 1802 was started and loaded. Flaring ended when STV/IP T/C 1802
was brought online, loaded and the flare valves closed.
A flaring event occurred at FS3 starting at 04/25/2013 10:14 and stopping at 04/25/2013 12:29 with a volume of 9
(MSCF). The event lasted for 135 minutes and was due to planned swapping of load from STV/IP T/C 1802 to STV/IP T/C
1801. One failed start attempt, before T/C 1801 was started and loaded. Flaring ended when STV/IP T/C 1801 was
brought online, loaded and the flare valves closed.
Please let me know if you have any questions.
Travis M. Rybicki
PCC-EOC (Production Optimization) Team Lead
Office 907-659-4472 (BOC) 659-5566 (PBOC)
Cell 907-748-2118 Harmony 758-4404
GPB Pager 907-659-5272 # 1890
akopspcceoctl(5bp. Com
Alternate: Kellie Okonek
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number2.
0290000030
Facility Name
PBU FS 3
3. Field
PBU - EOA
4. Operator
BP
5. Month/Year of Disposition
I May -2013
Disposition
Volume MCF
20. Forproductlon from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
O
Pool Name PoolCode Percent
7. Reinjected
O
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
1,884
9. Flared or vented more than 1 hour (see instr.)
16,478
10. Pilot and Purge
22,267
11. Assist Gas
8,577
12. Fuel gas used in lease operations.
847,076
13. Other (see instructions)
U
Official Use Only
Authorization >1 hr:
Safety
.MCF
14. TOTAL VOLUME (ITEMS 6.12)
896,282
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:CGF
869,343
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-27,102,455
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knovAedge.
Note: All volumes must be corrected
Signature Title Manager Production Taxes and R alties Alaska to pressure of 14.65 psis and to a
/ �J temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date I AAC25.235.
KLrr
q/1,703
Form 10-422 Rev. W009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
SP EXPLORATION (ALASKA( INC.
PRUDHOE BAY UNIT - FS -3
GAS FLARING INCIDENT REPORT Page 6
May 2013
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT& CAUSE ACTION TAKEN TO ELIMINATE CAUSE
5/12/2013 1454-1512 60 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
5/29/2013 0105-0111 625
TOTAL 685
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL
Planned Events Less Than or Equal 1
Hour AND <= 5,000 mcf
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT &CAUSE ACTION TAKEN TO ELIMINATE CAUSE
5/11/2013
1240-1245
60 See attachments See attachments
5/12/2013
1520-1530
60
5/13/2013
0100-0105
60
5/15/2013
1000-1100
296
5/20/2013
0311-0316
3
5/29/2013
0130-0135
240
5/29/2013
0355-0400
240
5/31/2013
1534-1540
240
TOTAL
1,199
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
5/11/2013 0105-0300 1,160 See attachments See attachments
5/11/2013 1302-1436 445
5/13/2013 0115-0315 995
5/15/2013 1505-1745 12,528
5/29/2013 0145-0355 875
5/31/2013 1400-1534 475
TOTAL 16,478
6/13/2013
2:31 PM
TOTAL
Unplanned Events <1 Hour
685
Unplanned Events> I Hour
0
Planned Events< 1 hour and not
1,199
exceeding 5,000 MCF
Planned Events> 1 hour or
16,478
exceeding 5,000 MCF
Pilot Purge
22,267
Assist
8,577
TOTAL FLARED VOLUME
49,206
6/13/2013
2:31 PM
Flare Start Date 05/01/2013
Flare End Date 05/31/2013
FS3 Flare Report
Total Volume (MSCF)
18362
Report
Numbe System
Date StartTime
Stop Time
Duration
Intermittent
Black Smoke Planned Reported By
Volume
13-244 Controlled Blowdown 05/11/2013 12:40:00 am
12:45:00 am
5 min
No
No Yes BP1\THOMASA
60
Determination Cause
1803 normal stop for water wash.
Action Taken
Completed shutdown.
13-244 Other
05/11/2013 1:05:00 am
3:00:00 am
115 min
No
No Yes BPI\THOMASA
1160
Determination Cause
T\C 1803 spin cooling
Action Taken
Completed spin cooling.
13-244 Other
05/11/2013 1:02:00 pm
2:36:00 pm
94 min
No
No Yes BPI\THOMASA
445
Determination Cause
1803 water wash
Action Taken
Completed water wash
13-248 Controlled Blowdown 05/12/2013 3:20:00 pm
3:30:00 pm
10 min
No
No Yes BP7\BOUWKA
60
Determination Cause
T\C 1803 shutdown due to controNnstmmentation
failure associated with F31AV recycle valve
Action Taken
Completed depressuring.
13-251 Controlled Blowdown 05/13/2013 1:00:00 am
1:05:00 am
5 min
No
No Yes BP1\BOUWKA
60
Determination Cause
T\C 1804 Shut Down for water wash
Action Taken
Completed shutdown.
13-251 Other
05/13/2013 1:15:00 am
3:15:00 am
120 min
No
No Yes BP1\BOUWKA
995
Determination Cause
TC 1804 spin cooling
Action Taken
Completed spin cooling.
13-258 Other
05/15/2013 10:00:00 am
11:00:00 am
60 min
No
No Yes BPI\THOMASA
296
Determination Cause
T\C 1804 spin for water wash
Action Taken
Completed spin water wash.
13-258 Controlled Blowdown 05/15/2013 3:05:00 pm
5:45:00 pm
160 min
No
No Yes BP1\THOMASA
12528
Determination Cause
Artificial Lift tie line to WOA depressured.
Action Taken
Completed depressro of tie Line
13-265 Controlled Blowdown 05/20/2013 3:11:00 am
3:16:00 am
5 min
No
No Yes BPI\THOMASA
3
Determination Cause
TC 1801 shutdown for planned maintenance
Action Taken
Completed shutdown.
13-281 Controlled Blowdown 05/29/2013 1:30:00 am 1:35:00 am 5 min No No Yes BPi\CARVERW 240
Determination Cause 1806 T/C normal shutdown from idle for Planned Maintenance.
Generated 06/10/2013 9:22:50AM Page 8 of 14
Flare Start Date 05/01/2013
Flare End Date 05/31/2013
Action Taken Normal Compresor Case depressudng volume.
13-281 Other
05/29/2013 1:45:00 am 3:55:00 am 130 min No No Yes BP1\CARVERW 875
Determination Cause
1806 T/C Cooldown Cranking for Planned Maintenance... Waterwash, VIGV Insp. .....
Action Taken
Completed Cooldown Cranking. Normal shutdown. Continued cooldown in Ratchet Cooldown Mode.
13-281 Controlled Blowdown 05/29/2013 3:55:00 am 4:00:00 am 5 min No No Yes BP1\CARVERW 240
Determination Cause
1806 TIC normal shutdown from Cooldown Cranking Made for Planned Maintenance.
Action Taken
Normal Compressor Case depressruing volume.
13-286 Other
05/31/2013 2:00:00 pm 3:34:00 pm 94 min No No Yes BP1\DONATR 475
Determination Cause
T/C 1806 water wash crank.
Action Taken
Completed the water wash.
13-286 Other 05/31/2013 3:34:00 pm 3:40:00 pm 6 min No No Yes BP1\DONATR 240
Determination Cause T/C 1806 normal shutdown from water wash crank mode.
Action Taken Normal compressor case depressuring volume.
Total Volume (MSCF) 18362
Generated 06/10/2013 9:22:50AM Page 9 of 14
Hunt, Jennifer L (DOA
From: AK, OPS PCC ECC TL (AKOPSPCCEOCTL@bp.com]
Sent: Tuesday, May 14, 2013 1:35 PM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; Kruger, Dale O; AK, HSSEE Env Adv West; AK, OPS FS1 Facility OTL; AK,
OPS FS1 OSM; Burgess, David H; AK, HSSEE Env Adv East; AK, OPS FS3 CSM; AK, OPS
FS3 Facility OTL
Subject: Gas flaring events at GC3, FS3, and FS1
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
0ennifer.hunt[@alaska.gov dave.robv@alaska.aov victoria.ferauson@alaska.eov
From: Kellie Okonek, GPB Production Optimization Team Leader
A flaring event occurred at FSI starting at 05/10/2013 20:35 and stopping at 05/10/2013 23:58 with a volume
of 987 (MSCF). The event lasted for 203 minutes and was due to shutdown of 1802 T/C due to a problem
associated with oil pressure. Flaring stopped when the compressor was re -loaded.
A flaring event occurred at FS3 starting at 05/11/2013 13:02 and stopping at 05/11/2013 14:36 with a volume
of 70 (MSCF). The event lasted for 94 minutes.
at FS3 starting at 05/11/2013 01:05 and stopping at 05/11/2013 03:00 with a volume of 40 (MSCF). The event
lasted for 115 minutes and was due to spin cooling of 1803 LPS compressor for water wash. Flaring stopped
when cooling complete.
A flaring event occurred at FS3 starting at 05/13/2013 01:15 and stopping at 05/13/2013 03:15 with a volume
of 40 (MSCF). The event lasted for 120 minutes and was due to spin cooling of 1804 LPS compressor for water
wash. Flaring stopped when cooling complete.
A flaring event occurred at GC3 starting at 05/11/2013 03:00 and stopping at 05/11/2013 18:30 with a volume
of 16146 (MSCF). The event lasted for 930 minutes. The event had a volume greater than 5000 (MSCF) and
was due to depressurization of the GHX line for planned pigging activities. Flaring stopped when the line was
depressured.
Please let me know if you have any questions.
Thanks,
Kellie Okonek (alt. Travis Rybicki)
PCCIEOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 382 1370 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akoosocceoctl(a.)bo.com
Hunt, Jennifer L (DOA
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent: Thursday, May 30, 2013 10:39 AM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, OPS FS3 OSM; AK, HSSEE Env Adv East; Burgess, David H, AK, OPS
FS3 Facility OTL; AK, OPS FS1 OSM; AK, OPS FS1 Facility OTL; AK, OPS CGF OTL; AK,
OPS CCP CGF OSM; AK, OPS GC1 OSM; AK, OPS GC1 Facility OTL; Kruger, Dale O; AK,
HSSEE Env Adv West
Subject: Gas flaring event at FS1 0"CGF, GCI
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
Tenniter.huntc@alaska.gov dave.roby(o)alaska.goy
victoria.ferguson(aa)alaska.gov
From: Kellie Okonek, GPB Production Optimization Team Leader
A flaring event occurred at GCI starting at 05/30/2013 00:40 and stopping at 05/30/2013 05:40 with a volume of 2760
(MSCF). The event lasted for 300 minutes and was due to use of the copus F/G to cool down the economizer for
inspection on the LPS compressor.
A flaring event occurred at GC1 starting at 05/25/2013 14:07 and stopping at 05/25/2013 14:19 with a volume of 600
(MSCF). The event was a black smoke event and was due to LP/IP compressor s/d for workon the emergency generator
breaker.
A flaring event occurred at GC1 starting at 05/24/2013 00:00 and stopping at 05/25/2013 with a volume of 250 (MSCF).
The event lasted for 1440 minutes and was due to valves leaking into the flare system.
A flaring event occurred at GC1 starting at 05/23/2013 00:00 and stopping at 05/24/2013 with a volume of 250 (MSCF).
The event lasted for 1440 minutes and was due to valves leaking into the flare system.
A flaring event occurred at GC1 starting at 05/22/2013 16:45 and stopping at 05/23/2013 with a volume of 320 (MSCF).
The event lasted for 435 minutes and was due to the skid50 valve closure which shut down the GCI shipping pumps.
Flaring occurred to maintain compressor operation, and stopped when flow rates were re-established to the GC.
A flaring event occurred at CGF starting at 05/29/2013 15:35 and stopping at 05/29/2013 17:00 with a volume of 16847
(MSCF). The event lasted for 85 minutes. The event had a volume greater than 5000 (MSCF) and was due to shutdown
of 1805 T/C due to PCU glitch.
A flaring event occurred at CGF starting at 05/29/2013 08:40 and stopping at 05/29/2013 11:00 with a volume of 16847
(MSCF). The event lasted for 140 minutes. The event had a volume greater than 5000 (MSCF) and was due to a
shutdown of 1855 TIC — flaring occurred while operations/maintenance worked to get the machine back online.
A flaring event occurred at FS3 starting at 05/29/2013 01:45 and stopping at 05/29/2013 03:55 with a volume of 875
(MSCF). The event lasted for 130 minutes and was due to 1806 T/C cooldown for planned maintenance. Flaring stopped
when cooldown was completed.
A flaring event occurred at FS1 starting at 05/26/2013 16:30 and stopping at 05/26/2013 16:31 with a volume of 83
(MSCF). The event was a black smoke event. Another event occurred at FS1 starting at 05/26/2013 16:11 and stopping
at 05/26/2013 16:13 with a volume of 168 (MSCF). The event was a black smoke event. A third event occurred at FS1
starting at 05/26/2013 15:51 and stopping at 05/26/2013 16:00 with a volume of 755 (MSCF). The event was a black
smoke event. These events were all related to the 1803 T/C water wash gas crank sequence, including attempts at the
crank sequence to investigate flare issues.
Please let me know if you have any questions.
Kellie Okonek (alt. Travis Rybicki)
PCC/EOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 382 1370 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
L --mail akoosocceoctlna bo.com
Hunt, Jennifer L (DOA
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent: Saturday, June 01, 2013 12:36 PM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, OPS FS3 OSM; AK, HSSEE Env Adv East; Burgess, David H; AK, OPS
FS3 Facility OTL; AK, OPS CGF OTL; AK, OPS CCP CGF OSM; AK, OPS GC1 Facility OTL;
O'Riordan, Colm J; AK, OPS PCC EOC TL
Subject: Gas flaring events at FS3, CGF
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
iennifer. h u nt(a)alaska. gov dave. robyaalaska. gov
victoria.ferg usonCaalaska.gov
From: Kellie Okonek, GPB Production Optimization Team Leader
A flaring event occurred at FS3 starting at 05/31/2013 14:00 and stopping at 05/31/2013 15:34 with a volume of 475
(MSCF). The event lasted for 94 minutes, and was due to T/C 1806 water wash crank. Flaring stopped when the water
wash was completed.
A flaring event occurred at FS3 starting at 05/13/2013 01:15 and stopping at 05/13/2013 03:15 with a volume of 995
(MSCF). The event lasted for 120 minutes and was due to T/C 1804 shutdown and spin cooling for water wash. Flaring
stopped when spin cooling complete.
A flaring event occurred at FS3 starting at 05/11/2013 13:02 and stopping at 05/11/2013 14:36 with a volume of 445
(MSCF). The event lasted for 94 minutes and was due to the 1803 water wash. Flaring stopped when water wash
completed.
A flaring event occurred at FS3 starting at 05/11/2013 01:05 and stopping at 05/11/2013 03:00 with a volume of 1160
(MSCF). The event lasted for 115 minutes and was due to spin cooling for water wash in item above. Flaring stopped
when spin cooling complete.
A flaring event occurred at CGF starting at 05/30/2013 21:41 and stopping at 05/30/2013 23:15 with a volume of 13290
(MSCF). The event lasted for 94 minutes. The event had a volume greater than 5000 (MSCF) and was due to MI T/C
1805 shutdown due to a problem with the backup PLC. Flaring stopped when T/C 1855 was started and facility operation
returned to normal.
Please let me know if you have any questions.
Kellie Okonek (alt. Travis Rybicki)
PCC/EOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 382 1370 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akopsocceodl aft.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000030
2. Facility Name
PBU FS 3
3. Field
PBU - EOA
4. Operator
BP
5. Month/Year of Disposition
June -2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
10,928
9. Flared or vented more than 1 hour (see instr.)
240
10. Pilot and Purge
21,215
11. Assist Gas
3,515
12. Fuel gas used in lease operations.
712,702
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
748,600
Lease Use
MCF
15. NGL Gas Equivalent
Q
Conservation
MCF
16. Purchased gas
Q
Waste:
MCF
17. Transferred from: CGF
733,917
—3—/
18. Transferred to: (Express as a negative #) CGF
-25,213,211
Comissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
M r _ Note: All volumes must is corrected
Signature pressure�Y Title Mana er Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Data AAC25.235.
I
6IL,F—
c0 3/! 3
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA)INC.
PRUDHOE BAY UNIT - FS -3
GAS FLARING INCIDENT REPORT
June 2013
Unplanned Events less than or equal to
1 hour
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
6/9/2013
1410-1415
3 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
6/9/2013
1415-1450
210
6/12/2013
0210-0215
240
6/12/2013
0240-0245
240
6/12/2013
0330-0335
240
6/14/2013
1011-1013
1,669
6/17/2013
0253-0305
7,548
TOTAL
10,150
See attachments See attachments
TOTAL 0
Planned Events Less Than or Equal 1
Hour AND <= 5,000 mcf
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
6/1/2013
0930-1015
240 See attachments See attachments
6/3/2013
1430-1435
3
6/7/2013
0247-0250
240
6/28/2013
1145-1157
75
6/28/2013
1153-1157
220
TOTAL
778
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT&CAUSE ACTION TAKENTO ELIMINATE CAUSE
6/14/2013 1423-1600 99 See attachments See attachments
6/14/2013 1423-1600 141
TOTAL 240
Unplanned Events <1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
TOTAL
10,150
0
778
240
21,215
3,515
35,898
Page 5
7/16/2013
11:26 AM
Flare Start Date 06/01/2013
Flare End Date 06/30/2013
FS3 Flare Report Total Volume (MSCF)
11168
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned
Reported By
Volume
13-290 Other 06/01/2013 9:30.00 am 10.15:00am 45 min No No Yes
BP11DONATR
240
Determination Cause Depressuretl 1806 compressor case and discharge piping to repair leaking grease zerk on F68AV.
Action Taken Completed the repair on the leaking grease zerk on F68AV and pressurized the piping.
13-293 Controlled Blowdown 06/03/2013 2:30:00 pm 2:35:00 pm 5 min No No Yes
BPi\DONATR
3
Determination Cause TIC 1801 normal shutdown after test min after 4000 hr PM.
Action Taken 1801 shutdown Complete.
13-299 Controlled Blowdown 06/07/2013 2:47:00 am 2:50:00 am 3 min No No Yes
BP1\WELBORD
240
Determination Cause Normal stop on 1806 due to lowAll- rates
Action Taken Completed shutdown.
13-321 Controlled Blowdown 06/14/2013 2:23:00 pm 4:00:00 pm 97 min No No Yes BPi\BOUWKA 99
Determination Cause Depressured DS6 CIL B for CIL blinding/make piggable work
Action Taken Completed depressudng.
13-321 Controlled Blowdown 06/14/2013 2:23:00 pm 4:00:00 pm 97 min No No Yes BP1\BOUWKA 141
Determination Cause Depressuretl DS6 CIL D for CIL blinding/make piggable work
Action Taken Completed depressuring.
Generated 07/09/2013 4:10:03PM Page 6 of 10
Flare Start Date 06/01/2013
Flare End Date 06/30/2013
13-337 Other 05/28/2013 11:45:00 am 11:57:00 am 12 min No No Yes BP1\DONATR 75
Determination Cause 1806 T/C compressorflared during normal startup purge cycle.
Action Taken Completed 1806 T/C startup.
13-337 Other 06/28/2013 11:53:00 am 11:57:00 am 4 min Yes No Yes BP7\GARSKEH 220
Determination Cause 1806 T/C compressor flared during a normal start-up when the operator manually opened flare valve F23AV to give the compressor
discharge gas a path to flow due to plugged or frozen recycle silencer.
Action Taken Flare manually closed.
Total Volume (MSCF) 11168
Generated 07/09/2013 4:10:03PM Page 7 of 10
Hunt Jennifer L (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent: Monday, June 24, 2013 11:33 AM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; Burgess, David H; AK, OPS FS3 Facility OTL; AK, OPS FS3 OSM; AK,
HSSEE Env Adv East
Subject: Gas flaring events at FS3
To: Jennifer Hunt, AOGCC
iennifer. hunt(a.alaska.gov
CC: Dave Roby, AOGCC
dave.roby(a alaska.gov
From: Travis Rybicki. GPB Production Optimization Team Leader
CC: Victoria Ferguson, AOGCC
victoria.ferguson (aalaska.gov
A flaring event occurred at FS3 starting at 06114/2013 14:23 and stopping at 06/14/2013 16:00 with a volume of 99
(MSCF). The event lasted for 97 minutes. Flaring was due to the need to depressure the 6B Common Line for planned
project work. Flaring ended when the planned depressuring activities were completed and the flare valves closed.
A flaring event occurred at FS3 starting at 06/14/2013 14:23 and stopping at 06/14/2013 16:00 with a volume of 141
(MSCF). The event lasted for 97 minutes. Flaring was due to the need to depressure the 6D Common Line for planned
project work. Flaring ended when the planned depressuring activities were completed and the flare valves closed.
A flaring event occurred at FS3 starting at 06/17/2013 02:53 and stopping at 06/17/2013 03:05 with a volume of 7548
(MSCF). The intermittent event lasted for 12 minutes. Flaring was due to unplanned shutdown of a compressor at CGF
causing high gas transit line pressure. Rate was cut to reduce flare volume while CGF worked to resolve problems.
Flaring ended when sufficient rate was cut and CGF compressor issues resolved, at which time the flare valves closed.
Please let me know if you have any questions.
Travis M. Rybicki
PCC-EOC (Production Optimization) Team Lead
Office 907-659-4472 (BOC) 659-5566 (PBOC)
Cell 907-748-2118 Harmony 758-4404
GPB Pager 907-659-5272 # 1890
a ko psPcceoctl(a(a) bp. COm
Alternate: Kellie Okonek
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000030
2. Facility Name
PBU FS 3
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
July -2013
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
O
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
1,185
9. Flared or vented more than 1 hour (see instr.)
517
10. Pilot and Purge
23,859
11. Assist Gas
246
12. Fuel gas used in lease operations.
639,179
13. Other (see instructions)
0
Official Use Only
Authorization >1 hrMCF
Safety
J- �--
14. TOTAL VOLUME (ITEMS 6-12)
664,986
Lease Use
MCF
15, NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
663,038
18. Transferred to: (Express as a negative #) CGF
-18,592,588
Commissioner Date
19. Remarks:
I hereby certify that th,pioregoing is true and correct to the best of my knowledge.
N
Signature '{ Title Manager Production Taxes and Ro allies Alaska ote: All volumes must be corrected
to pressure of 14.65 Asia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
t�Lr'
q/j31�3
Forth 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -3
GAS FLARING INCIDENT REPORT
July 2013
Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT&CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL
0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME
VOLUME DESCRIPTION OF INCIDENT&CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
7/8/2013 0535-0540
240 See attachments
See attachments
7/23/2013 0235-0240
60
7/25/2013 0532-0552
419
7/27/2013 0742-0819
466
TOTAL
1,185
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
7/16/2013 0959-1220
63 See attachments
See attachments
7/16/2013 1050-1220
229
7/29/2013 1500-1630
225
TOTAL
517
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events > 1 Hour
0
Planned Events< l hourand not
1,185
exceedini 5,000 MCF
Planned Events> 1 hour or
517
exceeding, 5,000 MCF
Pilot Purge
23,859
Assist
246
TOTAL FLARED VOLUME
25,807
Page 6
8/12/2013
2:34 PM
Flare StartDate 07/01/2013
Flare End Date 07/31/2013
FS3 Flare Report
Total Volume (MSCF) 1702
Report
Numbs System
Date StartTime Stop Time Duration Intermittent
Black Smoke Planned Reported By Volume
13-346 Controlled Blowdown 07/05/2013 5:35:OOam 5:40:00 am 5min No
No Yes BP1\BOUWKA 240
Determination Cause
Shut Down 1806 Big AL due to lack of A/L users
Action Taken
Completed shutdown.
13-353 Controlled Blowdown 07/16/2013 9:59:00 am 12:20:00 pm 141 min No
No Yes BP1\THOMASA 63
Determination Cause
14D common line depressuring for future be ins to 14B/C Common line.
Action Taken
Finished depressuring common line.
13-353 Controlled Blowdown 07/16/2013 10:50:00 am 12:20:00 pm 90 min No
No Yes BPI\THOMASA 229
Determination Cause
14B/C common line depressured for make piggable / inspectable tie ins.
Action Taken
Finished depressuring.
13-361 Controlled Blowdown 07/23/2013 2:35:00 am 2:40:00 am 5 min No
No Yes BP1\DONATR 60
Determination Cause
1803 LPS T/C normal shutdown due to low rates.
Action Taken
Completed normal shutdown of TIC.
13-366 Other
07/25/2013 5:32:00 am 5:52:00 am 20 min No
No Yes BP10ONATR 419
Determination Cause
Depressured the WOA AL line from FV3751 to F448/748AV to allow drilling rig critical lift.
Action Taken
Completed the depressurization and lift.
13-369 Other
07/27/2013 74200am 8:19:00 am 37 min No
No Yes BPI OONATR 466
Determination Cause
Depressured the WOA AL line from FV3751 to F448f748AV to allow drilling rig to be lifted overthe line
Action Taken
Completed the lift and stopped depressurization.
13-374 Controlled Blowdown 07/29/2013 3:00:00 pm 4:30:00 pm 90 min No
No Yes BPI\LOGANPD 225
Determination Cause
14B/C CL depressure for pigging spool removal
Action Taken
Completed depressuring.
Total Volume (MSCF) 1702
Generated 08/07/2013 11:29:06AM Page 8 of 11
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000030
2. Facility Name
PBU FS 3
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
I Au ust-2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
O
PRUDHOE 640150 100.00%
B. Flared or vented 1 hour or less
9,803
9. Flared or vented more than 1 hour (see instr.)
542
10. Pilot and Purge
24,358
11. Assist Gas
1,782
12. Fuel gas used in lease operations.
836,830
13. Other (see instructions)
U
Official Use Only
Authorization>1 hr
Safety
C /1Z
✓ "7
MCF
14. TOTAL VOLUME (ITEMS 6-12)
873,315
Lease Use
MCF
15. NGL Gas Equivalent
U
Conservation
MCF
16. Purchased gas
UW
aste:
MCF
17. Transferred from: CGF
861,188
, / ! _ 7 r / _ /
--� V
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-24,461,224
19. Remarks:
I hereby certify that t foregoing is true and correct to the best of my knowledge.
Iq Note: All volumes must be corrected
Signature. Title Title Mana er Production Taxes and Royaltig Alaska to pressure of 14.65 psia and to a
l! temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date / 7 AAC25.235.
VLF
�d3114-
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -3
GAS FLARING INCIDENT REPORT Page 5
August 2013
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
8/20/2013 1259-1305 3 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
8/20/2013 1309-1400 12
8/26/2013 1450-1545 9,329
TOTAL 9,344
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
8/20/2013 1300-1422 342 See attachments See attachments
TOTAL 342
8/1/2013
0330-0400
26 See attachments See attachments
8/3/2013
2102-2115
75
8/4/2013
1715-1730
80
8/9/2013
0430-0435
3
8/13/2013
1433-1453
269
8/21/2013
1500-1535
6
TOTAL
459
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
8/6/2013 1114-1315 200 See attachments See attachments
TOTAL 200
TOTAL
Unplanned Events < 1 Hour 9,344
Unplanned Events> 1 Hour 342
Planned Events< l hour and not 459
exceeding 5,000 MCF
Planned Events> 1 hour or 200
exceeding 5,000 MCF
Pilot Purge 24,358
Assist 1,782
TOTAL FLARED VOLUME 36,485
9/12/2013
3:32 PM
Flare StartDate 08/0112013
Flare End Date 08/31/2013
FS3 Flare Report
Total Volume (MSCF) 10345
Report
Numbe System
Date StartTime Stop Time Duration Intermittent
Black Smoke Planned Reported By Volume
13-377 Controlled Blowdown 08/01/2013 3:3000 am 4:00:00 am 30 min No
No Yes BPI\THOMASA 26
Determination Cause
Depressure 14B/C common line for pig receiver removal.
Action Taken
Completed depressudng.
13-385 Controlled Blowdown 08/03/2013 9:02:00 pm 9:15:00 pm 13 min No
No Yes BPI\THOMASA 75
Determination Cause
1806 compressor startup.
Action Taken
Completed 1806 wmpressor start up.
13-388 Controlled Blowdown 08/0412013 5:15:00 pm 5:30:00 pm 15 min No
No Yes BP1\BOUWKA 80
Determination Cause
1803 Compressor Normal Startup
Action Taken
Completed 1803 Compressor Normal Start up
13-391 Controlled Blowdown 08/0612013 11:14:00 am 1:15:00 pm 121 min No
No Yes BPI\THONIASA 200
Determination Cause
Depressured 13Dwmmon line.
Action Taken
Finished depressudng common line.
13-398 Controlled Blowdown 08/09/2013 4:30:00 am 4:35:00 am 5 min No
No Yes BPI\THOMASA 3
Determination Cause
Normal stop for 1802 SN/IP compressor.
Action Taken
1802 finished tlepressudng.
13407 Controlled Blowdown 08/13/2013 2:33:00 pm 2:53:00 pm 20 min No
No Yes BP1\BOUWKA 269
Determination Cause
Depressure FS112 A/L Tie Line from 491 to 457 psi for line lifts. Need to keep below 500 psi
Action Taken
Completed tlepressudng.
13-424 Other
08/20/2013 1:00:00 pm 2:22:00 pm 82 min No
No No BP1\DONATR 342
Determination Cause
While attempting to start 1801 T/C, the COSD and IP Suction Scrubber flare vent valves opened to relieve system until 1802 T/C started.
Action Taken
After three failed attempts to start 1801, we started 1802 T/C one start.
13-427 Controlled Blowdown 08/21/2013 3:00:00 pm 3:35:00 pm 35 min Yes
Determination Cause 1801 started (one start) and loaded. 1802 unloaded and normal stop.
Action Taken Purge and depressum complete.
No
Yes BP hGARSKEH 6
Generated 09/04/2013 10:13:15AM Page 5 of 12
Flare Start Date 08/01/2013
Flare End Date 08131/2013
Total Volume (MSCF) 10345
Generated 09/04/2013 10:13:16AM Page 6 of 12
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent: Sunday, August 18, 2013 8:57 AM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; Burgess, David H; AK, OPS FS3 Facility OTL; AK, OPS FS3 OSM; AK,
HSSEE Env Adv East
Subject: Gas flaring event at FS3
To: Jennifer Hunt, AOGCC
ienniter.hunt(aalaska.gov
CC: Dave Roby, AOGCC
dave.roby(o)alaska.gov
From: Travis Rybicki, GPB Production Optimization Team Leader
CC: Victoria Ferguson, AOGCC
victoria.ferguson(o)alaska.gov
A flaring event occurred at FS3 starting at 08/06/2013 11:14 and stopping at 08/06/2013 13:15 with a volume of 200
(MSCF). The event lasted for 121 minutes. Flaring was due to the need to depressure the 13D Common Line for planned
project work. Flaring ended when the planned depressuring activities were completed and the flare valves closed.
Please let me know if you have any questions.
Travis M. Rybicki
PCC•EOC (Production Optimization) Team Lead
Office 907-659-4472 (BOC) 659-5566 (PBOC)
Cell 907-748-2118 Harmony 7584404
GPB Pager 907-659-5272 # 1890
akol)spcceoctl(ibp. Com
Alternate: Kellie Okonek
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com)
Sent: Sunday, August 25, 2013 11:06 PM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; Kruger, Dale O; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; AK,
HSSEE Env Adv West; AK, OPS GC2 Facility OTL; AK, OPS GC2 OSM; AK, OPS GC3
Facility & Field OTL; AK, OPS GC3&PCC OSM; AK, OPS FS3 OSM; AK, OPS FS3 Facility
OTL; Burgess, David H; AK, HSSEE Env Adv East
Subject: Gas flaring events at GC1, GC2, GC3, FS3
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
iennifer.huntCcbalaska.aov dave.robvaa alaska.gov victoria.ferouson(oilalaska.gov
From: Kellie Okonek, GPB Production Optimization Team Leader
A flaring event occurred at GC2 starting at 08/25/2013 00:00 and stopping at 08/25/2013 13:00 with a volume of 7583
(MSCF). The event lasted for 780 minutes. The event had a volume greater than 5000 (MSCF) and was due to flaring off
the LPS compressors as the transit system pressure came up during startup of gas lifted rate.
A flaring event occurred at GC2 starting at 08/24/2013 13:24 and stopping at 08/25/2013 with a volume of 6448 (MSCF).
The event lasted for 636 minutes. The event had a volume greater than 5000 (MSCF) and was due to flaring off the IP/LP
compressors for operational stability as GILT was ramping back up.
A flaring event occurred at GCI starting at 08/24/2013 00:24 and stopping at 08/24/2013 20:52 with a volume of 7826
(MSCF). The event lasted for 1228 minutes. The event had a volume greater than 5000 (MSCF) and was due to final
depressurization of the GT -13 for planned inspections.
A flaring event occurred at GC1 starting at 08/23/2013 19:45 and stopping at 08/24/2013 with a volume of 980 (MSCF).
The event lasted for 255 minutes and was due to depressurization of the GT -13 line for planned inspections.
A flaring event occurred at GC3 starting at 08/24/2013 00:00 and stopping at 08/24/2013 15:30 with a volume of 2000
(MSCF). The event lasted for 930 minutes and was due to depressurization of GT -13 for planned inspections. Flaring
stopped when pressure reduced to below 250 psig.
A flaring event occurred at FS3 starting at 08/20/2013 13:00 and stopping at 08/20/2013 14:22 with a volume of 342
(MSCF). The event lasted for 82 minutes and was due to STV/IP compressor 1801 having operational issues. Flaring
stopped when operations switched to 1802.
Please let me know if you have any questions.
Kellie Okonek (alt. Travis Rybicki)
PCC/EOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 382 1370 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akopspcceoctlta.)bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000030
2. Facility Name
PBU FS 3
3. Field
PBU - EOA
4, Operator
BP
5. MonthNear of Disposition
September -2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Q
Pool Name Pool Code Percent
7. Reinjected
Q
PRUDHOE 640150 100.00
8. Flared or vented 1 hour or less
2,657
9. Flared or vented more than 1 hour (see instr.)
772
10. Pilot and Purge
23,899
11. Assist Gas
1,629
12. Fuel gas used in lease operations.
723,899
13. Other (see instructions)
Q
Official Use Only
Authorization >1 hr
Safe fY
�a Z
a
MCF
14. TOTAL VOLUME (ITEMS 6-12)
752,856
Lease Use
MCF
15. NGL Gas Equivalent
p
Conservation
MCF
16. Purchased gas
Q
Waste:
MCF
17. Transferred from: CGF
747.798
n
/ (p
18. Transferred to: (Express as a negative #) CGF
-19,936,160
Commissioner Date
19. Remarks:
I hereby certify that th//he��� foregoing is//true and correct to the best of my knowledge .
��n y)� / iYl�nr t, Note: All volumes must be corrected
Signature CIA' ' l�/�/f�{/� Title Mana er Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a
/11 !1 temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date (J f� AAC25.235.
V�--/--
1,13/Iq
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
DATE
9/20/2013
9/20/2013
9/26/2013
9/26/2013
9/26/2013
1550-1555
1605-1610
0230-0232
0405-0407
0500-0502
TOTAL
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT -FS -3
GAS FLARING INCIDENT REPORT
September 2013
DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
240 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
155
3
3
3
404
See attachments See attachments
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE
9/8/2013
9/12/2013
9/12/2013
9/12/2013
9/12/2013
9/14/2013
9/14/2013
9/19/2013
9/19/2013
9/24/2013
9/30/2013
9/30/2013
9/30/2013
9/30/2013
9/30/2013
1500-1505
0130-0135
0945-1030
1545-1620
1755-1830
1537-1545
1540-1630
1720-1735
1905-1915
0730-0735
1030-1115
1445-1510
1520-1535
1615-1710
2000-2005
TOTAL
3 See attachments
60
643
44
215
60
743
43
21
3
89
80
80
109
60
2,253
See attachments
Page 5
10/11/2013
8:58 AM
Events
9/17/2013
9/22/2013
9/29/2013
1 Hour OR > 5,000
1414-1551
1420-1540
1600-1900
TOTAL
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -3
GAS FLARING INCIDENT REPORT
September 2013
74 See attachments
60
638
772
TOTAL
404
0
2,253
r&Z
23,899
1,629
28,957
CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Page 6
10/11/2013
8:58 AM
Flare Start Date 09/01/2013
Flare End Date 09/302013
FS3 Flare Report
Total Volume (MSCF)
3429
Report
Numbs System Date StartTime Stop Time Duration Intermittent
Black Smoke Planned Reported By
Volume
13-049 Controlled Slowdown 09/08/2013 3:00:00 pm 3:05:00 pm 5 min No
No Yes BP1\THOMASA
3
Determination Cause 1801 compressor skid normal stop.
Action Taken Completed shutdown.
13-455 Controlled Blowdown 09/12/2013 1:30:00 am 1:35:00 am 5 min No
No Yes BP7\DONATR
60
Determination Cause 1803 TIC normal shutdown due to low gas rates from the shutdown of 7C/15C Commonline.
Action Taken Completed the shutdown/blowdown sequence.
13-455 Controlled Blowdown 09/12/2013 9:45:00 am 10:30:00 am 45 min No
No Yes BP7\DONATR
643
Determination Cause Depressured the 7C/15C Commonline for pigging spool installation.
Action Taken Completed the depressurization of 7C/1 5C Commonline.
13-455 Controlled Blowdown 09/12/2013 3:45:00 pm 4:20:00 pm 35 min No No Yes BP1\DONATR 44
Determination Cause Depressured 7B and 7D Commonline to Flare to isolate the Drillsite for 7C/15C pigging spool installation.(22msof for each CL)
Action Taken Completed the depressurization of 7B and 7D Commonline.
13-455 Controlled Blowdown 09/12/2013 5:55:00 pm 6:30:00 pm 35 min No No Yes BPMONATR 215
Determination Cause Depressured 15B and 15D Commonline to isolate the Drillsite for 7C/1 5C pigging spool Installation. (78ni for 156 and 137mscf for 15D
CL)
Action Taken Completed the depressurization of the Commonlines.
13-062 Controlled Blowdown 09/14/2013 3:37:00 pm 3:45:00 pm 8 min No No Yes BP1\DONATR 60
Determination Cause 1803 TIC Shutdown after FS1 Tieline sweep due to low rates.
Action Taken Completed the 1803 Shutdown sequence.
13 462 Controlled Slowdown 09/14/2013 3:40:00 pm 4:30:00 pm 50 min No No Yes BP1\DONATR 743
Determination Cause Depressured the FS1 Tieline for pigging spool installation. Starting pressure at 170 psi.
Action Taken Completed the depressurization of the FS1 Tieline.
13-466 Controlled Blowdown 09/17/2013 2:14:00 pm 3:51:00 pm 97 min No No Yes BP1\DONATR 74
Determination Cause Depressured 6B Commonline to remove the blinds on 6D CL after pigging spools were installed. (Starting pressure at 175psi)
Action Taken Completed the depressurization of 6B CL.
13-475 Controlled Blowdown 09/19/2013 5:20:00 pm 5:35:00 pm 15 min No No Yes BPt\DONATR 43
Determination Cause 6D Commonline depressured to maintain it below 50psi until it gets QC'd after bringing up DS6.
Action Taken Completed the depressurization of 60 CL.
13-475 Controlled Blowdown 09/19/2013 7:05:00 pm 7:15:00 pm 10 min No No Yes BP10ONATR 21
Determination Cause 6D Commonline depressured to maintain it below 50psi until it gets QC'd after bringing up DS6.
Action Taken Completed the depressurization of 6D CL.
Determination Cause
Generated 10/022013 9:20:43AM Page 5 of 10
Flare Start Date 09/01/2013
Flare End Date 09/30/2013
Action Taken
13-480 Controlled Blowdown 09/22/2013 2:20:00 pm 3:40:00 pm 80 min No No Yes BP1\GARSKEH 60
Determination Cause Depressure CL 6D to install pigging launcher at DS end, due to leaking valve.
Action Taken 6D was depressured enought to Install spool.
13-484 Controlled Blowdown 09/24/2013 7:30:00 am 7:35:00 am 5 min No No Yes BPI\GARSKEH 3
Determination Cause Attempted start on 1801, shut down on vibration as it was going to ilde speed.
Action Taken Blowdown complete.
Total Volume (MSCF) 3429
Generated 10/02/2013 9:20:43AM Page 6 of 10
13-500 Other 09/29/2013 4:00:00 pm 7:00:00 pm
180 min
Yes
No
Yes
BP1\W ELBORD
638
Determination Cause 1803Waterwash
Action Taken Completed water wash of 1803 compressor
13-501 Controlled Blowdown 09/30/2013 10:30:00 am 11:15:00 am
45 min
No
No
Yes
BP1\BOUWKA
89
Determination Cause Depressure 6D CIL to remove pig launcher & receiver
Action Taken Completed depressudng.
13-501 Controlled Blowdown 09/30/2013 2:45:00 pm 3:10:00 pm
25 min
No
No
Yes
BPl\BOUWKA
80
Determination Cause Failed start on 1803
Action Taken Completed depressudng.
13-501 Controlled Blowdown 09/30/2013 3:20:00 pm 3:35:00 pm
15 min
No
No
Yes
BP1\B0UWKA
80
Determination Cause Failed start on 1803
Action Taken Completed depressuring.
13501 Controlled Blowdown 09/30/2013 4:15:00 pm 5:10:00 pm
55 min
No
No
Yes
BP1\BOUWKA
109
Determination Cause Started 1803, let it fire to warm up
Action Taken Loaded LPS TIC.
13-501 Controlled Blowdown 09/30/2013 8:00:00 pm 8:05:00 pm
5 min
No
No
Yes
BP1\WELBORO
60
Determination Cause Normal stop on 1804 TIC for maintenance
Action Taken Completed shutdown of 1804 TIC
Total Volume (MSCF) 3429
Generated 10/02/2013 9:20:43AM Page 6 of 10
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOG TL [AKOPSPCCEOCTL@bp.coml
Sent: Sunday, September 01, 2013 2:31 PM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; Kruger, Dale O; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; AK,
HSSEE Env Adv West; AK, OPS FS3 OSM; AK, OPS FS3 Facility OTL; Burgess, David H;
AK, HSSEE Env Adv East; AK, OPS FS2 Facility OTL; AK, OPS FS2 OSM
Subject: Gas flaring events at GC1, FS2, so
To: Jennifer Hunt, AOGCC
ien niter. h u nt(aalaska.gov
CC: Dave Roby, AOGCC
dave. robv(a)alaska. aov
From: Kellie Okonek, GPB Production Optimization Team Leader
CC: Victoria Ferguson, AOGCC
victoria. ferouson( alaska.gov
A flaring event occurred at FS2 starting at 08/31/2013 15:31 and stopping at 08/31/2013 17:50 with a volume of 18
(MSCF). The event lasted for 139 minutes and was due to depressurization of 16D commonline for planned removal of
temporary pigging facilities. Flaring stopped when depressurization complete.
A flaring event occurred at GC1 starting at 08/26/2013 11:05 and stopping at 08/26/2013 16:35 with a volume of 320
(MSCF). The event lasted for 330 minutes and was due to swapping of GILT machines for water washes. Flaring stopped
when water washes complete.
A flaring event occurred at FS3 starting at 08/26/2013 14:50 and stopping at 08/26/2013 15:45 with a volume of 9329
(MSCF). The event was a black smoke event. The event had a volume greater than 5000 (MSCF) and was due to a
power outage that caused loss of T/C's 1801, 1803, & 1806 in addition to the water section, regens shipping pump, etc.
Flaring stopped when the turbine/compressors were started and re -loaded after getting generator power established.
Please let me know if you have any questions.
Kellie Okonek (alt. Travis Rybicki)
PCC/EOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 382 1370 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akopsocceoctl(cilbp.com
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent: Wednesday, September 25, 2013 10:49 PM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; Kruger, Dale O; AK, OPS GC1 Facility OTL; AK, OPS GCI OSM; AK,
HSSEE Env Adv West; AK, OPS GC3 Facility & Field OTL; AK, OPS GC3&PCC OSM; AK,
OPS FS3 OSM; AK, OPS FS3 Facility OTL; Burgess, David H; AK, HSSEE Env Adv East; AK,
OPS PCC EOC TL; AK, OPS FS2 OSM; AK, OPS FS2 Facility OTL
Subject: Gas flaring events at GC1, GC3, FS2,
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson,
AOGCC
jenniter.hunt(a alaska.00v dave.roby(alaska.00v
victoria.ferouson(a)alaska ctov
From: Kellie Okonek, GPB Production Optimization Team Leader
A flaring event occurred at FS2 starting at 09/24/2013 01:00 and stopping at 09/24/2013 03:00 with a volume of 214
(MSCF). The event lasted for 120 minutes, and was due to depressurization of 9A commonline for repairs. Flaring
stopped when line depressured.
A flaring event occurred at FS2 starting at 09/23/2013 20:30 and stopping at 09/23/2013 23:30 with a volume of 479
(MSCF). The event lasted for 180 minutes, and was due to DS9E commonline coming down to swap blinds.
A flaring event occurred at FS3 starting at 09/22/2013 14:20 and stopping at 09/22/2013 15:40 with a volume of 60
(MSCF). The event lasted for 80 minutes, and was due to depressurization of 6D commonline to install a pig launcher.
Flaring stopped when line depressured.
A flaring event occurred at GC1 starting at 09/18/2013 02:20 and stopping at 09/18/2013 15:00 with a volume of 220
(MSCF). The event lasted for 760 minutes, and was due to scheduled water wash on K7001.
A flaring event occurred at GC3 starting at 09/18/2013 00:01 and stopping at 09/18/2013 02:00 with a volume of 413
(MSCF). The event lasted for 119 minutes, and was due to wet gas compressor shutdown due to control/instrumentation
failure. Flaring stopped when WOA production was decreased.
A flaring event occurred at GC3 starting at 09/17/2013 20:02 and stopping at 09/18/2013 with a volume of 826 (MSCF).
The event lasted for 238 minutes, and was due to wet gas compressor shutdown due to control/instrumentation failure.
Flaring stopped when WOA production was decreased.
A flaring event occurred at FS3 starting at 09/17/2013 14:14 and stopping at 09/17/2013 15:51 with a volume of 74
(MSCF). The event lasted for 97 minutes, and was due to depressurization of 6B for the make-piggable project.
A flaring event occurred at GCI starting at 09/16/2013 03:00 and stopping at 09/16/2013 22:30 with a volume of 6070
(MSCF). The event lasted for 1170 minutes. The event had a volume greater than 5000 (MSCF) and was due to
depressurization of GT -13 in support of line lifts for inspection.
Please let me know if you have any questions.
Kellie Okonek (alt. Travis Rybicki)
PCC/EOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 382 1370 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akopspcceoctlabp.com
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent: Monday, September 30, 2013 8:33 AM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, OPS FS3 OSM; AK, OPS FS3 Facility OTL; Burgess, David H; AK,
HSSEE Env Adv East; AK, OPS PCC EOC TL; AK, OPS FS1 OSM; AK, OPS FSI Facility
OTL
Subject: Gas flaring events at FS1,�
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson,
AOGCC
iennifer.hunt@alaska.gov dave.robv@alaska.gov
victoria.ferauson analaska.gov
From: Kellie Okonek, GPB Production Optimization Team Leader
A flaring event occurred at FS3 starting at 09/29/2013 16:00 and stopping at 09/29/2013 19:00 with a volume of 638
(MSCF). The event lasted for 180 minutes, and was due to 1803 water wash. Flaring stopped when the water wash was
complete.
A flaring event occurred at FS1 starting at 09/27/2013 00:00 and stopping at 09/27/2013 01:45 with a volume of 510
(MSCF). The event lasted for 105 minutes, and was due to TIC 1802 shutdown due to a lube oil leak on the GG. Flaring
stopped when STV/IP T/C 1801 was loaded.
Please let me know if you have any questions.
Kellie Okonek (alt. Travis Rybicki)
PCC/EOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 382 1370 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akopsocceoctl(a)bo.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000030
2 Facility Name
PBU FS 3
3. Field
PBU - EOA
4. Operator
BP
5. Month a'of Disposition
October -2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
1 119
9. Flared or vented more than 1 hour (see instr.)
4,521
10. Pilotand Purge
24,739
11. Assist Gas
9,546
12. Fuel gas used in lease operations.
779,773
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr
SafetyG/
�Z /
/
MCF
14. TOTAL VOLUME (ITEMS 6-12)
819,698
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste.
MCF
17. Transferred from: CGF
804,512
'
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-25,383,412
19. Remarks:
I hereby certify that the
� foregoing is true and correct to the best of my knowledge.
//�/ln Note: All volumes must be corrected
Signature fil /rJ� c, '�'iY Title Manager Production Taxes and Ro lties Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
x/3/14
VLF
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Flare Start Date 10/01/2013
Flare End Date 1081/2013
FS3 Flare Report Total Volume (MSCF) 5640
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
13-502 Controlled Blowdown 10/01/2013 10:15:OOam 11:00:OOam 45min No
No
Yes
BP1\WELBORD
138
Determination Cause Depressure of 6D common line for pig launcher removal
Action Taken Completed blowdown of common line
13-503 Controlled Blowdown 10/02/2013 3:15:00 pm 5:47:00 pm 152 min Yes
No
Yes
BP1\WELBORD
635
Determination Cause 1804 TIC spin for Water wash
Action Taken 1804 T/C completed water wash
13-503 Controlled Blowdown 10/02/2013 10:00:00 pm 10:05:00 pm 5 min No
No
Yes
BP1\WELSORD
240
Determination Cause 1806 T/C Normal stop for upcoming maintenance
Action Taken 1806 TIC completed shut down
13-503 Controlled Blowdown 10/02/2013 10:00:00 pm 11:59:00 pm 119 min No
No
Yes
BP1\WELBORO
580
Determination Cause 1806 T/C spin cool
Action Taken 1806 TIC completed spin cool
13-507 Flare Relief 10/03/2013 8:44:00 pm 10:39:00 pm 115 min No
No
Yes
BP1\WELBORD
378
Determination Cause Depressured 15D C/L for isolation to remove blinds on 7C/15C CIL
Action Taken Completed dpressure of 15D C/L
13-507 Flare Relief 10/03/2013 8:44:00 pm 10:39:00 pm 115 min No
No
Yes
BP1\WELBORD
212
Determination Cause Depressured 15B C/L for Isolation to remove blinds on 7CI15C CIL
Action Taken Completed dpressure of 15B C/L
13-507 Flare Relief 10/03/2013 8:44:00 pm 10:39:00 pm 115 min No
No
Yes
BP1\WELBORD
59
Determination Cause Depressured 7B C/L for isolation to remove blinds on 7CI15C C/L
Action Taken Completed dpressure of 7B C/L
13507 Flare Relief 10/03/2013 8:44:00 pm 10:39:00 pm 115 min No
No
Yes
BP1\WELBORD
58
Determination Cause Depressured 7D C/L for isolation to remove blinds on 7C11 5C CIL
Action Taken Completed dpressure of 7D C/L
Daily Volume (MSCF)
707
13509 Controlled Blowdown 10/04/2013 8:00:00 pm 9:00:00 pm 60 min No
No
Yes
BP1\WELBORD
449
Generated 11104/2013 3:38:24PM
Page
8 of 13
Flare Start Date 10101/2013
Flare End Date 10/312013
Determination Cause Depressured 1806 case, suction, and discharge piping to Ops! for EIL
Action Taken Completed total depressure of 1806 and blocked In flare vent valves
13-517 Controlled Blowdown 10/07/2013 12:25:00 pm 2:10:00 pm 105 min No No
Determination Cause Shutdown Tin -line from FS3 to FS1 -bad grease zerk on outside block valve.
Action Taken Completed depressudng.
Daily Volume (MSCF) 449
Yes BPI\BOUWKA 2213
Daily Volume (MSCF) 2213
13-523 Other 10/09/2013 1:00:00 pm 2:50:00 pm 110 min No No Yes BP1\CARVERW 386
Determination Cause 1806 Turbine -Planned Waterwash and Drying Cycle for maintenance. Starting Turbine used to rotate Axile Flow Compressor/Turbine for
maintenance.
Action Taken Completed Waterwash and Drying Cycle.
Daily Volume (MSCF) 386
Total Volume (MSCF) 5640
Generated 11/042013 3:38:24PM Page 9 of 13
Hunt, Jennifer L (DOA
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent: Tuesday, October 15, 2013 10:46 AM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; Burgess, David H; AK, OPS FS3 Facility OTL; AK, HSSEE Env Adv East; AK,
OPS FS3 OSM
Subject: Gas flaring events a
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
iennifer.hunt(a)alaska.gov dave.roby( alaska.gov victoria.ferguson5alaska.gov
From: Travis Rybicki, GPB Production Optimization Team Leader
A flaring event occurred at FS3 starting at 10/02/2013 15:15 and stopping at 10/02/2013 17:47 with a volume of 635
(MSCF). The event lasted for 152 minutes. Flaring was due to planned spin cool of unit in preparation for planned water
wash of LPS T/C 1804. Flaring continued while T/C 1804 was spin cooled. Flaring ended when T/C 1804 was cool and
flare valves closed.
A flaring event occurred at FS3 starting at 10/02/2013 22:00 and stopping at 10/02/2013 23:59 with a volume of 580
(MSCF). The event lasted for 119 minutes. Flaring was due to planned spin cool of unit in preparation for planned water
wash of AL T/C 1806. Flaring continued while T/C 1806 was spin cooled. Flaring ended when T/C 1806 was cool and
flare valves closed.
A flaring event occurred at FS3 starting at 10/03/2013 20:44 and stopping at 10/03/2013 22:39 with a volume of 378
(MSCF). The event lasted for 115 minutes. Flaring was due to planned depressuring of Common Line 15D to remove
isolation related to make piggable projects. Flaring ended when C/L 15D was depressured and flare valves closed.
A flaring event occurred at FS3 starting at 10/03/2013 20:44 and stopping at 10/03/2013 22:39 with a volume of 212
(MSCF). The event lasted for 115 minutes. Flaring was due to planned depressuring of Common Line 156 to remove
isolation related to make piggable projects. Flaring ended when C/L 15B was depressured and flare valves closed.
A flaring event occurred at FS3 starting at 10/03/2013 20:44 and stopping at 10/03/2013 22:39 with a volume of 58
(MSCF). The event lasted for 115 minutes. Flaring was due to planned depressuring of Common Line 7D to remove
isolation related to make piggable projects. Flaring ended when C/L 7D was depressured and flare valves closed.
A flaring event occurred at FS3 starting at 10/03/2013 20:44 and stopping at 10/03/2013 22:39 with a volume of 59
(MSCF). The event lasted for 115 minutes. Flaring was due to planned depressuring of Common Line 7B to remove
isolation related to make piggable projects. Flaring ended when C/L 7B was depressured and flare valves closed.
A flaring event occurred at FS3 starting at 10/04/2013 20:00 and stopping at 10/04/2013 21:00 with a volume of 449
(MSCF). The event lasted for 60 minutes. Flaring was due to planned depressuring of AL T/C 1806 system piping for
planned maintenance work. Flaring continued while T/C 1806 piping was depressured. Flaring ended when T/C 1806
piping was depressured and flare valves closed.
A flaring event occurred at FS3 starting at 10/07/2013 12:25 and stopping at 10/07/2013 14:10 with a volume of 2213
(MSCF). The event lasted for 105 minutes. Flaring was due to unplanned shut down of the FS3-FS1 Tie Line to repair a
leaking gas zerk fitting. Flaring continued while the tie line was depressured. Flaring ended when tie line was
depressured and flare valves closed.
A flaring event occurred at FS3 starting at 10/09/2013 13:00 and stopping at 10/09/2013 14:50 with a volume of 386
(MSCF). The event lasted for 110 minutes. Flaring was due to planned water wash of AL T/C 1806. Flaring continued
while T/C 1806 was water washed. Flaring ended when T/C 1806 water wash was completed and flare valves closed.
Please let me know if you have any questions.
Travis M. Rybicki
PCC-EOC (Production Optimization) Team Lead
Office 907-659-4472 (BOC) 659-5566 (PBOC)
Cell 907-748-2118 Harmony 758-4404
GPB Pager 907-659-5272 # 1890
akopspcceoctl(O7bo. com
Alternate: Kellie Okonek
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000030
2. Facility Name
PB FS 3
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
November -2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Cade Percent
7. Reinjected
O
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
23,875
11. Assist Gas
14
12. Fuel gas used in lease operations.
940,926
13. Other (see instructions)
0
Official Use Only
Authorization >i hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
96015
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
p
Waste:
MCF
17. Transferred from: CGF
964,801
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-29,626,071
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Ii�IMn�6/In�� Note: All volumes must corrected
Signature (� Title Manager Production Taxes and Ro hies Alaska to pressure of 14.65 psisis and to a
temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000030
2. Facility Name
PBU i 3
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
December -2013
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
U
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
9
9. Flared or vented more than 1 hour (see instr.)
27
10. Pilot and Purge
28,421
11. Assist Gas
70
12. Fuel gas used in lease operations.
1,000,852
13. Other (see instructions) ctions)
Use Only
Authorization >I hr
SafetyOfficial
MCF
14. TOTAL VOLUME (ITEMS 6-12)
1,029,379
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
1,029,273
mmissioner
CoDate
18. Transferred to: (Express as a negative #) CGF
-31,487,241
19. Remarks:
I hereby certify that t foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date /// J1I AAC25.235.
VZ -4--
4-l3/!Zf
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
TOTAL
i
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -3
GAS FLARING INCIDENT REPORT
December 2013
Not required for unplanned events <=1 hr
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <=1 hr
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
12/28/2013
1200-1800
27 See attachments
See attachments
TOTAL
27
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
12/29/2013
1315-1325
3 See attachments
See attachments
12/29/2013
1420-1425
3
12/31/2013
1435-1440
3
TOTAL
9
DATE
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
See attachments
0
TOTAL
0
27
9
0
28,421
70
28,527
ACTION TAKEN TO ELIMINATE
See attachments
Page 6
1/12/2014
10:27 AM
r
Flare Start Date 12/01/2013
Flare End Date 12/31/2013
FS3 Flare Report
Total Volume (MSCF) 36
Report
Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
13-597 Controlled Blowdown 12/28/2013 12:00:00 pm 6:00:00 pm 360 min
Yes
No
Determination Cause Nine 1801 TIC Failed starts after compressor purge.
Action Taken Stopped tring to start 1801 T/C
13-599 Controlled Blowdown 12/29/2013 1:15:00 pm 1:25:00 pm 10 min
No
No
Determination Cause Started 1801 STVIIP T/C
Action Taken Completed compressor purge on 1801 STV/IP TIC
13-599 Controlled Blowdown 12/29/2013 2:20:00 pm 2:25:00 pm 5 min
No
No
Determination Cause Normal operational stop on 1802 STV/IP T/C
Action Taken Completed shutdown.
14-1 Controlled Blowdown 12/31/2013 2:35:00 pm 2:40:00 pm 5 min
No
No
Determination Cause 1801 STV/IP T/C normal stop
Action Taken Completed shutdown.
Generated 01/06/2014 95043AM
No BPIIWELBORD 27
Yes BPI\WELBORD 3
Yes BPMELBORD 3
Yes BPMELBORD 3
Total Volume (MSCF) 36
Page 5 of 8
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent: Tuesday, January 07, 2014 7:43 AM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; Burgess, David H; AK, OPS FS3 Facility OTL; AK, OPS FS3 OSM; AK,
HSSEE Env Adv East
Subject: Gas flaring event at FS3
To Jennifer Hunt, AOGCC
iennifer.huntna alaska.gov
CC: Dave Roby, AOGCC
dave. roby(5alaska.gov
From: Travis Rybicki, GPB Production Optimization Team Leader
CC: Victoria Ferguson, AOGCC
victoria.ferguson(a)alaska. aov
A flaring event occurred at FS3 starting at 12/28/2013 12:00 and stopping at 12/28/2013 18:00 with a volume of 27
(MSCF). The event lasted for 360 minutes. Flaring was due to numerous failed start attempts on TIC 1801 STV/IP
compressor to enable swapping from the online unit, TIC 1802. Flaring ended when the decision was made to no longer
attempt to start the TIC 1801 unit.
Please let me know if you have any questions.
Travis M. Rybicki
PCC•EOC (Production Optimization) Team Lead
Office 907-659-4472 (BOC) 659-5566 (PBOC)
Cell 907-748-2118 Harmony 758-4404
GPB Pager 907-659-5272 # 1890
akopspcceoctl(cDbP. COM
Alternate: Kellie Okonek