Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPBU FS 3 Gas DispositionState of Alaska AOGC C Gas Disposition Files Year: 2013 Facility: PBU FS 3 Operator: BP EXPLORATION (ALASKA) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000030 2. Facility Name PBU FS 3 3. Field PBU - EOA 4. Operator BP 5. Monthlyear of Disposition I January -2013 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Cade Percent 7. Reinjected O PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 3,799 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 22,230 11. Assist Gas 11 12. Fuel gas used in lease operations. 909,218 13. Other (see instructions) 0 Official Use Only Authorization >i hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 935,258 Lease Use MCF 15. NGL Gas Equivalent U Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: CGF 931,448 Commissioner Date 18. Transferred to: (Express as a negative #)CGF -29,994,476 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. �/J viA Note: All volumes must be corrected Signature_ IUU//// ddPP lit C! Title Mana er Production Taxes and Ro alties Alaska to pressure of 14.65 psia and to a i 2 temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date /-� AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - FS -3 GAS FLARING INCIDENT REPORT January 2013 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 1/5/2013 1705-1801 2,385 Not required for unplanned events <= 1 hr Not required for unplanned events <=1 hr 1/18/2013 2130-2135 3 1/18/2013 2155-2200 3 1/20/2013 0505-0510 3 1/20/2013 1620-1715 633 1/25/2013 1010-1015 3 1/25/2013 1900-2000 630 1/25/2013 1900-1905 3 1/25/2013 1910-1915 3 1/25/2013 1920-1925 3 TOTAL 3,669 Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 1/3/2013 0520-0600 124 See attachments See attachments 1/25/2013 1310-1315 3 1/26/2013 1620-1625 3 TOTAL 130 Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO EUMINATE CAUSE See attachments See attachments TOTAL Page 5 2/13/2013 46 PM TOTAL Unplanned Events. 1 Hour 3,669 Unplanned Events> 1 Hour 0 Planned Events< l hour and not 130 exceeding 5,000 MCF Planned Events> 1 hour or 0 exceeding 5,000 MCF Pilot Purge 22,230 Assist 11 TOTAL FLARED VOLUME 26,040 Page 5 2/13/2013 46 PM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000030 2. Facility Name PBU FS 3 3. Field PBU - EOA 4. Operator BP 5. Month/Year of Disposition February -2013 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume, 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 100.00% B. Flared or vented 1 hour or less 578 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 20,073 11. Assist Gas 2,486 12. Fuel gas used in lease operations. 864,744 13. Other (see instructions) 0 Official Use Only Authorization >11 hr: Safety MCP 14. TOTAL VOLUME (ITEMS 6.12) 887,881 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: CGF 884,817 Commissioner Date 18. Transferred to: (Express as a negative #) CGF -28,306,200 19. Remarks: I hereby certify that a foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature Title Manager Production Taxes and Ro al ies Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Dale 4146 AAC25.235, Form 10-422 Rev. M009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT- FS -3 GAS FLARING INCIDENT REPORT February 2013 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 2/1/2013 0415-0453 211 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr 2/1/2013 0547-0631 141 2/3/2013 1444-1522 214 TOTAL 566 VOLUME DESCRIPTION OF IN See attachments See attachments TOTAL 0 TOTAL Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf 566 DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 2/3/2013 2020-2025 3 See attachments See attachments 2/11/2013 1300-1310 3 2/21/2013 1106-1111 3 0 2/21/2013 1725-1730 3 TOTAL 12 20,073 Planned Events Exceeding 1 Hour OR > 5,000 mcf 2,456 DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 Page 5 3/13/2013 9:52 AM TOTAL Unplanned Events < 1 Hour 566 Unplanned Events> 1 Hour 0 Planned Events < 1 hour and not 12 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 20,073 Assist 2,456 TOTAL FLARED VOLUME 23,137 Page 5 3/13/2013 9:52 AM McMains, Stephen E (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Sunday, February 24, 2013 1:58 PM To: Ferguson, Victoria L (DOA); Regg, James B (DOA); McMains, Stephen E (DOA) Cc: AK, OPS FS3 OSM; Burgess, David H; Benson, Gary A; Leonard, Sean A; Arthur, Gregory; AK, HSSEE Env Adv East; AK, HSSEE Env TL (North Slope); AK, OPS PCC EOC TL; AK, OPS FS3 Facility OTL Subject: FS3 Skid 50 uncontrolled release 5 day report Victoria Ferguson, Jim Regg & Stephen McMains, This is a follow-up to the courtesy verbal/email notifications made 2/19/13 to the North Slope and Anchorage AOGCC offices. Please find enclosed the 5 -day report for the release which occurred at the Skid 50 NGL Module 4984 on 2/19/13. This was also faxed to 907-276-7542. Please give me a call if you have further questions. A 30 -day report will be provided after completion of the incident investigation. Regards, Travis M. Rybicki PCC-EOC (Production Optimization) Team Lead Office 907-659-4472 (BOC) 659-5566 (PBOC) Cell 907-748-2118 Harmony 758-4404 GPB Pager 907-659-5272 # 1890 akoasocceoctl(cbD. com Alternate: Kellie Okonek AOGCC 5 -day gas report FS3 Ski... BP Exploration (Alaska) Inc. P.O. Box 196612, Anchorage, AK 99519-6612 REPORT OF ACCIDENTAL GAS RELEASE (5 -day and 30 -day report) Date: 24 February 2013 For All Releases To: Chairman Alaska Oil and Gas Conservation Commission 333 W. 7fh Ave, Suite Anchorage, AK 99501-3539 Fax: 276-7542 DESCRIPTION OF INCIDENT—Skid 50 Module 4984 NGLs illlrelease on metering skid 1. Date and Time: 19 February 2013 @ 0917 2. Location: Detailed Location __A _Prudhoe Bay Unit Skid 50 Module 4984 _Endicott _Milne Point _Badami Northstar Other 3. Volume of natural gas lost: 583 scf NGL vapour 192 gallons of liquid NGL 4. Cause of loss: A loss of primary containment (LOPC) occurred during maintenance preparation for planned work on the LACT NGL meter Prover located in Module 4984 at Skid 50. 5. Actions taken and planned to prevent The fire and gas (F&G) system acted per design, closing further loss: the NGL system associated battery limit valves and source was controlled. Halon system discharged as designed for cause. Actions were taken on supply and delivery lines to limit source and pressure to leak location. Incident was managed as a Tier I event. Once de-escalated, skid entry was made, with associated clean-up and ventilation activities. Prior to restart of the NGL skid, a F&G system functional test was performed. Operations executed a thorough joint integrity survey before start up. Halon system was replenished prior to start up. The actual cause of the incident is currently under investigation. 6. Equipment or procedural changes to Pending investigation findings. Investigation will review prevent loss from recurring: equipment and procedural aspects of the incident. 7. Contact Name and telephone number). Travis M. R bicki 907-659-4472 Signature: a� cc: Jim Regg, AOGCC Stephen McMains, AOGCC Tom Maunder, AOGCC BPX Air Quality Technical Authority MB, 11-6 (Fax: 564-5020) BPX Volume Accounting MB, 12-4 (Fax: 56411094) BPX Planning and Performance Manager, MB 380D East Area Operations Manager, PRB-10 Production Optimization Team Leader, F-1 McMains, Stephen E (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj Sent: Monday, April 15, 2013 11:21 AM To: Ferguson, Victoria L (DOA); Regg, James B (DOA); McMains, Stephen E (DOA) Cc: Burgess, David H; AK, OPS FS3 OSM; AK, OPS FS3 Facility OTL; Leonard, Sean A; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv East; AK, HSSEE Env TL (North Slope); AK, OPS PCC EOC TL Subject: FS3 Skid 50 uncontrolled release 30 day report Attachments: FS3 skid 50 uncontrolled release AOGCC 30 day report.pdf Victoria Ferguson, Jim Regg & Stephen McMains, This is a follow-up to the 5 -day report submitted on 2/14/13. Please find the enclosed 30 -day report for the release which occurred at the Skid 50 NGL Module 4984 on 2/19/13. Please give me a call if you have further questions. Thanks, Kellie Okonek (alt. Travis Rybicki) PCC/EOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akopspcceoctl(d)bp.com From: AK, OPS PCC EOC TL Sent: Thursday, March 21, 2013 4:54 PM To: victoria.ferguson(abalaska.gov Subject: RE: FS3 Skid 50 uncontrolled release 5 day report Victoria, I realize the 30 day report for this event was due today. The incident investigation was completed today so it will take a few more days to receive the report and complete the 30 day report. We will transmit the 30 day report as soon as feasible. I apologize for the late notice — I returned Tuesday and was just informed late yesterday the investigation was wrapping up today. Regards, Travis M. Rybicki PCC-EOC (Production Optimization) Team Lead Office 907-659-4472 (BOC) 659-5566 (PBOC) Cell 907-748-2118 Harmony 758-4404 GPB Pager 907-659-5272 # 1890 a kopspcceoctl Ca) b P. Com Alternate: Kellie Okonek From: AK, OPS PCC EOC TL Sent: Sunday, February 24, 2013 1:58 PM To: Ferguson, Victoria L (DOA); 'Regg, James B (DOA)'; 'McMains, Stephen E (DOA)' Cc: AK, OPS FS3 OSM; Burgess, David H; Benson, Gary A; Leonard, Sean A; Arthur, Gregory; AK, HSSEE Env Adv East; AK, HSSEE Env TL (North Slope); AK, OPS PCC EOC TL; AK, OPS FS3 Facility OTL Subject: FS3 Skid 50 uncontrolled release 5 day report Victoria Ferguson, Jim Regg & Stephen McMains, This is a follow-up to the courtesy verbal/email notifications made 2/19/13 to the North Slope and Anchorage AOGCC offices. Please find enclosed the 5 -day report for the release which occurred at the Skid 50 NGL Module 4984 on 2/19/13. This was also faxed to 907-276-7542. Please give me a call if you have further questions. A 30 -day report will be provided after completion of the incident investigation. Regards, Travis M. Rybicki PCC-EOC (Production Optimization) Team Lead Office 907-659-4472 (BOC) 659-5566 (PBOC) Cell 907-748-2118 Harmony 758-4404 GPB Pager 907-659-5272 # 1890 a koPsPcceoctl (a)bo. co m Alternote: Kellie Okonek BP Exploration (Alaska) Inc. P.O. Box 196612, Anchorage, AK 99519-6612 REPORT OF ACCIDENTAL GAS RELEASE (30 -day report) Date: 15 April 2013 For All Releases To: Chairman Alaska Oil and Gas Conservation Commission 333 W. 7" Ave, Suite Anchorage, AK 99501-3539 Fax: 276-7542 DESCRIPTION OF INCIDENT— Skid 50 Module 4984 NGLs ill/release on metering skid 1. Date and Time: 19 February 2013 @ 0917 2. Location: Detailed Location _X_Prudhoe Bay Unit Skid 50 Module 4984 _Endicott _Milne Point _Badami Northstar Other 3. Volume of natural gas lost: 583 scf NGL vapour 192 gallons of liquid NGL 4. Cause of loss: A loss of primary containment (LOPC) occurred during maintenance preparation for planned work on the LACT NGL meter (Prover) located in Module 4984 at Skid 50. Operators failed to follow the steps outlined in their procedure, opening a valve on a hose prior to the hose beinq connected at its other end. 5. Actions taken and planned to prevent The fire and gas (F8G) system acted per design, closing further loss: the NGL system associated battery limit valves and source was controlled. Halon system discharged as designed for cause. Actions were taken on supply and delivery lines to limit source and pressure to leak location. Incident was managed as a Tier I event. Once de-escalated, skid entry was made, with associated clean-up and ventilation activities. Prior to restart of the NGL skid, a F8G system functional test was performed. Operations executed a thorough joint integrity survey before start up. Halon system was replenished prior to start up. The actual cause of the incident was part of a formal incident investigation process. Key findings/action items noted below will be progressed to prevent further losses from subsequent similar maintenance activities. 6. Equipment or procedural changes to The investigation team recommends the following: prevent loss from recurring: • A permanent engineered piping system will be installed to eliminate the potential for LOPC events when performing future maintenance activities of the scope that caused the incident a Maintenance procedures will be reviewed and revised to further raise awareness during subsequent maintenance activities. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000030 2. Facility Name PBU FS 3 3. Field PBU - ECA 4. Operator BP 5. MontivYear of Disposition March -2013 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume, 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected O PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 268 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 21,752 11. Assist Gas 68 12. Fuel gas used in lease operations. 954,889 13. Other (see instructions) 0 Official Use Only Authorization >t hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 976,977 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: CGF 976,641 Commissioner Date 18. Transferred to: (Express as a negative #) CGF -27,027,254 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. /7M� �nyApn� Note: All Volumes must be corrected Signature ,�� c'/ / i(..(1](�i%/� Title Mana er Production Taxes and,Royplties Alaska to pressure of 14.65 psis and to a I / /Uh temperature of 60o F. Authority 20 Printed Name Diane Colley`Y' Phone (907) 564-5775 Datell� AAC25.235. Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - FS -3 GAS FLARING INCIDENT REPORT March 2013 Events less than or eaual to 1 Not required for unplanned events <= 1 hr TOTAL 0 See attachments Not required for unplanned events <= 1 hr See attachments TOTAL 0 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT& CAUSE ACTION TAKEN TO ELIMINATE CAUSE 3/10/2013 1436-1438 268 See attachments See attachments TOTAL 268 TOTAL Unplanned Events < 1 Hour Unplanned Events > 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME D, TOTAL 0 0 268 0 21,752 68 22,088 See attachments ACTION TAKEN TOE See attachments Page 5 4/10/2013 1:30 PM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000030 2. Facility Name PBU FS 3 3. Field PBU - EOA 4. Operator BP 5. MonthlYear of Disposition April -2013 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 11 9. Flared or vented more than 1 hour (see instr.) 9 10. Pilot and Purge 21,091 11. Assist Gas 828 12. Fuel gas used in lease operations. 909,036 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safely � MCF 14. TOTAL VOLUME (ITEMS 6-12) 930,775 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas p Waste: MCF 17. Transferred from: CGF 926,796 -/3 18. Transferred to: (Express as a negative #) CGF -28,695,727 Commissioner Date 19. Remarks: I hereby certify that IN foregoing is We and correct to the best of my knowledge. ,r Note: All volumes must be corrected Signature [ CffA Title Mana er Production Taxes and Ro allies Alaska to pressure of 14.65 Asia and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235. lrL� G /12� l3 Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - FS -3 GAS FLARING INCIDENT REPORT April 2013 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 4/22/2013 0511-0611 8 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr TOTAL 8 See attachments See attachments TOTAL 0 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 4/2/2013 0422-0427 3 See attachments See attachments TOTAL 3 DATE 4/25/2013 1014-1229 TOTAL Unplanned Events < 1 Hour Unplanned Events > 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME 9 See attachments 9 TOTAL 8 0 3 9 21,091 628 21,739 CAUSE See attachments Page 7 5/14/2013 10:22 AM Flare StartOate 04/01/2013 Flare End Date 04/30/2013 FS3 Flare Report Total Volume (MSCF) 20 Report Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 13-155 Controlled Blowdown 04/02/2013 4:22:00 am 4:27:00 am 5 min No No Yes BP1\DONATR 3 Determination Cause Normal stop of 1802 compressor Action Taken Completed shutdown. 13-208 Controlled Blowdown 04/25/2013 10:14:00 am 12:29:00 pm 135 min Yes Determination Cause 1801 had one failed start attempt before putting on line. 1802 was manually shut down after loading 1801. Action Taken Normal depressure of case upon shutdown. No Yes BP1\GARSKEH 9 Total Volume (MSCF) 20 Generated 05/07/2013 9:39:07AM Page 6 of 12 Hunt, Jennifer L (DOA From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Tuesday, April 30, 2013 12:37 PM To: McMains, Stephen E (DOA); Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS FS3 Facility OTL; AK, OPS FS3 OSM; AK, HSSEE Env Adv East; Burgess, David H Subject: Gas flaring events at FS3 To: Jennifer Hunt, AOGCC L nifer.huntaalaska.00v CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC dave.robyna alaska.00v victoria.ferguson(U)alaska.aov From: Travis Rybicki, GPB Production Optimization Team Leader A flaring event occurred at FS3 starting at 04/22/2013 05:11 and stopping at 04/22/2013 06:11 with a volume of 8 (MSCF). The event lasted for 60 minutes and was due to shut down of STV/IP T/C 1801 due to control/instrumentation failure. Three start attempts were made before T/C 1802 was started and loaded. Flaring ended when STV/IP T/C 1802 was brought online, loaded and the flare valves closed. A flaring event occurred at FS3 starting at 04/25/2013 10:14 and stopping at 04/25/2013 12:29 with a volume of 9 (MSCF). The event lasted for 135 minutes and was due to planned swapping of load from STV/IP T/C 1802 to STV/IP T/C 1801. One failed start attempt, before T/C 1801 was started and loaded. Flaring ended when STV/IP T/C 1801 was brought online, loaded and the flare valves closed. Please let me know if you have any questions. Travis M. Rybicki PCC-EOC (Production Optimization) Team Lead Office 907-659-4472 (BOC) 659-5566 (PBOC) Cell 907-748-2118 Harmony 758-4404 GPB Pager 907-659-5272 # 1890 akopspcceoctl(5bp. Com Alternate: Kellie Okonek STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number2. 0290000030 Facility Name PBU FS 3 3. Field PBU - EOA 4. Operator BP 5. Month/Year of Disposition I May -2013 Disposition Volume MCF 20. Forproductlon from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold O Pool Name PoolCode Percent 7. Reinjected O PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 1,884 9. Flared or vented more than 1 hour (see instr.) 16,478 10. Pilot and Purge 22,267 11. Assist Gas 8,577 12. Fuel gas used in lease operations. 847,076 13. Other (see instructions) U Official Use Only Authorization >1 hr: Safety .MCF 14. TOTAL VOLUME (ITEMS 6.12) 896,282 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from:CGF 869,343 Commissioner Date 18. Transferred to: (Express as a negative #) CGF -27,102,455 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knovAedge. Note: All volumes must be corrected Signature Title Manager Production Taxes and R alties Alaska to pressure of 14.65 psis and to a / �J temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date I AAC25.235. KLrr q/1,703 Form 10-422 Rev. W009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate SP EXPLORATION (ALASKA( INC. PRUDHOE BAY UNIT - FS -3 GAS FLARING INCIDENT REPORT Page 6 May 2013 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT& CAUSE ACTION TAKEN TO ELIMINATE CAUSE 5/12/2013 1454-1512 60 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr 5/29/2013 0105-0111 625 TOTAL 685 Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT &CAUSE ACTION TAKEN TO ELIMINATE CAUSE 5/11/2013 1240-1245 60 See attachments See attachments 5/12/2013 1520-1530 60 5/13/2013 0100-0105 60 5/15/2013 1000-1100 296 5/20/2013 0311-0316 3 5/29/2013 0130-0135 240 5/29/2013 0355-0400 240 5/31/2013 1534-1540 240 TOTAL 1,199 Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 5/11/2013 0105-0300 1,160 See attachments See attachments 5/11/2013 1302-1436 445 5/13/2013 0115-0315 995 5/15/2013 1505-1745 12,528 5/29/2013 0145-0355 875 5/31/2013 1400-1534 475 TOTAL 16,478 6/13/2013 2:31 PM TOTAL Unplanned Events <1 Hour 685 Unplanned Events> I Hour 0 Planned Events< 1 hour and not 1,199 exceeding 5,000 MCF Planned Events> 1 hour or 16,478 exceeding 5,000 MCF Pilot Purge 22,267 Assist 8,577 TOTAL FLARED VOLUME 49,206 6/13/2013 2:31 PM Flare Start Date 05/01/2013 Flare End Date 05/31/2013 FS3 Flare Report Total Volume (MSCF) 18362 Report Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 13-244 Controlled Blowdown 05/11/2013 12:40:00 am 12:45:00 am 5 min No No Yes BP1\THOMASA 60 Determination Cause 1803 normal stop for water wash. Action Taken Completed shutdown. 13-244 Other 05/11/2013 1:05:00 am 3:00:00 am 115 min No No Yes BPI\THOMASA 1160 Determination Cause T\C 1803 spin cooling Action Taken Completed spin cooling. 13-244 Other 05/11/2013 1:02:00 pm 2:36:00 pm 94 min No No Yes BPI\THOMASA 445 Determination Cause 1803 water wash Action Taken Completed water wash 13-248 Controlled Blowdown 05/12/2013 3:20:00 pm 3:30:00 pm 10 min No No Yes BP7\BOUWKA 60 Determination Cause T\C 1803 shutdown due to controNnstmmentation failure associated with F31AV recycle valve Action Taken Completed depressuring. 13-251 Controlled Blowdown 05/13/2013 1:00:00 am 1:05:00 am 5 min No No Yes BP1\BOUWKA 60 Determination Cause T\C 1804 Shut Down for water wash Action Taken Completed shutdown. 13-251 Other 05/13/2013 1:15:00 am 3:15:00 am 120 min No No Yes BP1\BOUWKA 995 Determination Cause TC 1804 spin cooling Action Taken Completed spin cooling. 13-258 Other 05/15/2013 10:00:00 am 11:00:00 am 60 min No No Yes BPI\THOMASA 296 Determination Cause T\C 1804 spin for water wash Action Taken Completed spin water wash. 13-258 Controlled Blowdown 05/15/2013 3:05:00 pm 5:45:00 pm 160 min No No Yes BP1\THOMASA 12528 Determination Cause Artificial Lift tie line to WOA depressured. Action Taken Completed depressro of tie Line 13-265 Controlled Blowdown 05/20/2013 3:11:00 am 3:16:00 am 5 min No No Yes BPI\THOMASA 3 Determination Cause TC 1801 shutdown for planned maintenance Action Taken Completed shutdown. 13-281 Controlled Blowdown 05/29/2013 1:30:00 am 1:35:00 am 5 min No No Yes BPi\CARVERW 240 Determination Cause 1806 T/C normal shutdown from idle for Planned Maintenance. Generated 06/10/2013 9:22:50AM Page 8 of 14 Flare Start Date 05/01/2013 Flare End Date 05/31/2013 Action Taken Normal Compresor Case depressudng volume. 13-281 Other 05/29/2013 1:45:00 am 3:55:00 am 130 min No No Yes BP1\CARVERW 875 Determination Cause 1806 T/C Cooldown Cranking for Planned Maintenance... Waterwash, VIGV Insp. ..... Action Taken Completed Cooldown Cranking. Normal shutdown. Continued cooldown in Ratchet Cooldown Mode. 13-281 Controlled Blowdown 05/29/2013 3:55:00 am 4:00:00 am 5 min No No Yes BP1\CARVERW 240 Determination Cause 1806 TIC normal shutdown from Cooldown Cranking Made for Planned Maintenance. Action Taken Normal Compressor Case depressruing volume. 13-286 Other 05/31/2013 2:00:00 pm 3:34:00 pm 94 min No No Yes BP1\DONATR 475 Determination Cause T/C 1806 water wash crank. Action Taken Completed the water wash. 13-286 Other 05/31/2013 3:34:00 pm 3:40:00 pm 6 min No No Yes BP1\DONATR 240 Determination Cause T/C 1806 normal shutdown from water wash crank mode. Action Taken Normal compressor case depressuring volume. Total Volume (MSCF) 18362 Generated 06/10/2013 9:22:50AM Page 9 of 14 Hunt, Jennifer L (DOA From: AK, OPS PCC ECC TL (AKOPSPCCEOCTL@bp.com] Sent: Tuesday, May 14, 2013 1:35 PM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, HSSEE Env Adv West; AK, OPS FS1 Facility OTL; AK, OPS FS1 OSM; Burgess, David H; AK, HSSEE Env Adv East; AK, OPS FS3 CSM; AK, OPS FS3 Facility OTL Subject: Gas flaring events at GC3, FS3, and FS1 To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC 0ennifer.hunt[@alaska.gov dave.robv@alaska.aov victoria.ferauson@alaska.eov From: Kellie Okonek, GPB Production Optimization Team Leader A flaring event occurred at FSI starting at 05/10/2013 20:35 and stopping at 05/10/2013 23:58 with a volume of 987 (MSCF). The event lasted for 203 minutes and was due to shutdown of 1802 T/C due to a problem associated with oil pressure. Flaring stopped when the compressor was re -loaded. A flaring event occurred at FS3 starting at 05/11/2013 13:02 and stopping at 05/11/2013 14:36 with a volume of 70 (MSCF). The event lasted for 94 minutes. at FS3 starting at 05/11/2013 01:05 and stopping at 05/11/2013 03:00 with a volume of 40 (MSCF). The event lasted for 115 minutes and was due to spin cooling of 1803 LPS compressor for water wash. Flaring stopped when cooling complete. A flaring event occurred at FS3 starting at 05/13/2013 01:15 and stopping at 05/13/2013 03:15 with a volume of 40 (MSCF). The event lasted for 120 minutes and was due to spin cooling of 1804 LPS compressor for water wash. Flaring stopped when cooling complete. A flaring event occurred at GC3 starting at 05/11/2013 03:00 and stopping at 05/11/2013 18:30 with a volume of 16146 (MSCF). The event lasted for 930 minutes. The event had a volume greater than 5000 (MSCF) and was due to depressurization of the GHX line for planned pigging activities. Flaring stopped when the line was depressured. Please let me know if you have any questions. Thanks, Kellie Okonek (alt. Travis Rybicki) PCCIEOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akoosocceoctl(a.)bo.com Hunt, Jennifer L (DOA From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Thursday, May 30, 2013 10:39 AM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS FS3 OSM; AK, HSSEE Env Adv East; Burgess, David H, AK, OPS FS3 Facility OTL; AK, OPS FS1 OSM; AK, OPS FS1 Facility OTL; AK, OPS CGF OTL; AK, OPS CCP CGF OSM; AK, OPS GC1 OSM; AK, OPS GC1 Facility OTL; Kruger, Dale O; AK, HSSEE Env Adv West Subject: Gas flaring event at FS1 0"CGF, GCI To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC Tenniter.huntc@alaska.gov dave.roby(o)alaska.goy victoria.ferguson(aa)alaska.gov From: Kellie Okonek, GPB Production Optimization Team Leader A flaring event occurred at GCI starting at 05/30/2013 00:40 and stopping at 05/30/2013 05:40 with a volume of 2760 (MSCF). The event lasted for 300 minutes and was due to use of the copus F/G to cool down the economizer for inspection on the LPS compressor. A flaring event occurred at GC1 starting at 05/25/2013 14:07 and stopping at 05/25/2013 14:19 with a volume of 600 (MSCF). The event was a black smoke event and was due to LP/IP compressor s/d for workon the emergency generator breaker. A flaring event occurred at GC1 starting at 05/24/2013 00:00 and stopping at 05/25/2013 with a volume of 250 (MSCF). The event lasted for 1440 minutes and was due to valves leaking into the flare system. A flaring event occurred at GC1 starting at 05/23/2013 00:00 and stopping at 05/24/2013 with a volume of 250 (MSCF). The event lasted for 1440 minutes and was due to valves leaking into the flare system. A flaring event occurred at GC1 starting at 05/22/2013 16:45 and stopping at 05/23/2013 with a volume of 320 (MSCF). The event lasted for 435 minutes and was due to the skid50 valve closure which shut down the GCI shipping pumps. Flaring occurred to maintain compressor operation, and stopped when flow rates were re-established to the GC. A flaring event occurred at CGF starting at 05/29/2013 15:35 and stopping at 05/29/2013 17:00 with a volume of 16847 (MSCF). The event lasted for 85 minutes. The event had a volume greater than 5000 (MSCF) and was due to shutdown of 1805 T/C due to PCU glitch. A flaring event occurred at CGF starting at 05/29/2013 08:40 and stopping at 05/29/2013 11:00 with a volume of 16847 (MSCF). The event lasted for 140 minutes. The event had a volume greater than 5000 (MSCF) and was due to a shutdown of 1855 TIC — flaring occurred while operations/maintenance worked to get the machine back online. A flaring event occurred at FS3 starting at 05/29/2013 01:45 and stopping at 05/29/2013 03:55 with a volume of 875 (MSCF). The event lasted for 130 minutes and was due to 1806 T/C cooldown for planned maintenance. Flaring stopped when cooldown was completed. A flaring event occurred at FS1 starting at 05/26/2013 16:30 and stopping at 05/26/2013 16:31 with a volume of 83 (MSCF). The event was a black smoke event. Another event occurred at FS1 starting at 05/26/2013 16:11 and stopping at 05/26/2013 16:13 with a volume of 168 (MSCF). The event was a black smoke event. A third event occurred at FS1 starting at 05/26/2013 15:51 and stopping at 05/26/2013 16:00 with a volume of 755 (MSCF). The event was a black smoke event. These events were all related to the 1803 T/C water wash gas crank sequence, including attempts at the crank sequence to investigate flare issues. Please let me know if you have any questions. Kellie Okonek (alt. Travis Rybicki) PCC/EOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) L --mail akoosocceoctlna bo.com Hunt, Jennifer L (DOA From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Saturday, June 01, 2013 12:36 PM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS FS3 OSM; AK, HSSEE Env Adv East; Burgess, David H; AK, OPS FS3 Facility OTL; AK, OPS CGF OTL; AK, OPS CCP CGF OSM; AK, OPS GC1 Facility OTL; O'Riordan, Colm J; AK, OPS PCC EOC TL Subject: Gas flaring events at FS3, CGF To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC iennifer. h u nt(a)alaska. gov dave. robyaalaska. gov victoria.ferg usonCaalaska.gov From: Kellie Okonek, GPB Production Optimization Team Leader A flaring event occurred at FS3 starting at 05/31/2013 14:00 and stopping at 05/31/2013 15:34 with a volume of 475 (MSCF). The event lasted for 94 minutes, and was due to T/C 1806 water wash crank. Flaring stopped when the water wash was completed. A flaring event occurred at FS3 starting at 05/13/2013 01:15 and stopping at 05/13/2013 03:15 with a volume of 995 (MSCF). The event lasted for 120 minutes and was due to T/C 1804 shutdown and spin cooling for water wash. Flaring stopped when spin cooling complete. A flaring event occurred at FS3 starting at 05/11/2013 13:02 and stopping at 05/11/2013 14:36 with a volume of 445 (MSCF). The event lasted for 94 minutes and was due to the 1803 water wash. Flaring stopped when water wash completed. A flaring event occurred at FS3 starting at 05/11/2013 01:05 and stopping at 05/11/2013 03:00 with a volume of 1160 (MSCF). The event lasted for 115 minutes and was due to spin cooling for water wash in item above. Flaring stopped when spin cooling complete. A flaring event occurred at CGF starting at 05/30/2013 21:41 and stopping at 05/30/2013 23:15 with a volume of 13290 (MSCF). The event lasted for 94 minutes. The event had a volume greater than 5000 (MSCF) and was due to MI T/C 1805 shutdown due to a problem with the backup PLC. Flaring stopped when T/C 1855 was started and facility operation returned to normal. Please let me know if you have any questions. Kellie Okonek (alt. Travis Rybicki) PCC/EOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akopsocceodl aft.com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000030 2. Facility Name PBU FS 3 3. Field PBU - EOA 4. Operator BP 5. Month/Year of Disposition June -2013 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 10,928 9. Flared or vented more than 1 hour (see instr.) 240 10. Pilot and Purge 21,215 11. Assist Gas 3,515 12. Fuel gas used in lease operations. 712,702 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6.12) 748,600 Lease Use MCF 15. NGL Gas Equivalent Q Conservation MCF 16. Purchased gas Q Waste: MCF 17. Transferred from: CGF 733,917 —3—/ 18. Transferred to: (Express as a negative #) CGF -25,213,211 Comissioner Date 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. M r _ Note: All volumes must is corrected Signature pressure�Y Title Mana er Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Data AAC25.235. I 6IL,F— c0 3/! 3 Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA)INC. PRUDHOE BAY UNIT - FS -3 GAS FLARING INCIDENT REPORT June 2013 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 6/9/2013 1410-1415 3 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr 6/9/2013 1415-1450 210 6/12/2013 0210-0215 240 6/12/2013 0240-0245 240 6/12/2013 0330-0335 240 6/14/2013 1011-1013 1,669 6/17/2013 0253-0305 7,548 TOTAL 10,150 See attachments See attachments TOTAL 0 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 6/1/2013 0930-1015 240 See attachments See attachments 6/3/2013 1430-1435 3 6/7/2013 0247-0250 240 6/28/2013 1145-1157 75 6/28/2013 1153-1157 220 TOTAL 778 Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT&CAUSE ACTION TAKENTO ELIMINATE CAUSE 6/14/2013 1423-1600 99 See attachments See attachments 6/14/2013 1423-1600 141 TOTAL 240 Unplanned Events <1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME TOTAL 10,150 0 778 240 21,215 3,515 35,898 Page 5 7/16/2013 11:26 AM Flare Start Date 06/01/2013 Flare End Date 06/30/2013 FS3 Flare Report Total Volume (MSCF) 11168 Report Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 13-290 Other 06/01/2013 9:30.00 am 10.15:00am 45 min No No Yes BP11DONATR 240 Determination Cause Depressuretl 1806 compressor case and discharge piping to repair leaking grease zerk on F68AV. Action Taken Completed the repair on the leaking grease zerk on F68AV and pressurized the piping. 13-293 Controlled Blowdown 06/03/2013 2:30:00 pm 2:35:00 pm 5 min No No Yes BPi\DONATR 3 Determination Cause TIC 1801 normal shutdown after test min after 4000 hr PM. Action Taken 1801 shutdown Complete. 13-299 Controlled Blowdown 06/07/2013 2:47:00 am 2:50:00 am 3 min No No Yes BP1\WELBORD 240 Determination Cause Normal stop on 1806 due to lowAll- rates Action Taken Completed shutdown. 13-321 Controlled Blowdown 06/14/2013 2:23:00 pm 4:00:00 pm 97 min No No Yes BPi\BOUWKA 99 Determination Cause Depressured DS6 CIL B for CIL blinding/make piggable work Action Taken Completed depressudng. 13-321 Controlled Blowdown 06/14/2013 2:23:00 pm 4:00:00 pm 97 min No No Yes BP1\BOUWKA 141 Determination Cause Depressuretl DS6 CIL D for CIL blinding/make piggable work Action Taken Completed depressuring. Generated 07/09/2013 4:10:03PM Page 6 of 10 Flare Start Date 06/01/2013 Flare End Date 06/30/2013 13-337 Other 05/28/2013 11:45:00 am 11:57:00 am 12 min No No Yes BP1\DONATR 75 Determination Cause 1806 T/C compressorflared during normal startup purge cycle. Action Taken Completed 1806 T/C startup. 13-337 Other 06/28/2013 11:53:00 am 11:57:00 am 4 min Yes No Yes BP7\GARSKEH 220 Determination Cause 1806 T/C compressor flared during a normal start-up when the operator manually opened flare valve F23AV to give the compressor discharge gas a path to flow due to plugged or frozen recycle silencer. Action Taken Flare manually closed. Total Volume (MSCF) 11168 Generated 07/09/2013 4:10:03PM Page 7 of 10 Hunt Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Monday, June 24, 2013 11:33 AM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Burgess, David H; AK, OPS FS3 Facility OTL; AK, OPS FS3 OSM; AK, HSSEE Env Adv East Subject: Gas flaring events at FS3 To: Jennifer Hunt, AOGCC iennifer. hunt(a.alaska.gov CC: Dave Roby, AOGCC dave.roby(a alaska.gov From: Travis Rybicki. GPB Production Optimization Team Leader CC: Victoria Ferguson, AOGCC victoria.ferguson (aalaska.gov A flaring event occurred at FS3 starting at 06114/2013 14:23 and stopping at 06/14/2013 16:00 with a volume of 99 (MSCF). The event lasted for 97 minutes. Flaring was due to the need to depressure the 6B Common Line for planned project work. Flaring ended when the planned depressuring activities were completed and the flare valves closed. A flaring event occurred at FS3 starting at 06/14/2013 14:23 and stopping at 06/14/2013 16:00 with a volume of 141 (MSCF). The event lasted for 97 minutes. Flaring was due to the need to depressure the 6D Common Line for planned project work. Flaring ended when the planned depressuring activities were completed and the flare valves closed. A flaring event occurred at FS3 starting at 06/17/2013 02:53 and stopping at 06/17/2013 03:05 with a volume of 7548 (MSCF). The intermittent event lasted for 12 minutes. Flaring was due to unplanned shutdown of a compressor at CGF causing high gas transit line pressure. Rate was cut to reduce flare volume while CGF worked to resolve problems. Flaring ended when sufficient rate was cut and CGF compressor issues resolved, at which time the flare valves closed. Please let me know if you have any questions. Travis M. Rybicki PCC-EOC (Production Optimization) Team Lead Office 907-659-4472 (BOC) 659-5566 (PBOC) Cell 907-748-2118 Harmony 758-4404 GPB Pager 907-659-5272 # 1890 a ko psPcceoctl(a(a) bp. COm Alternate: Kellie Okonek STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000030 2. Facility Name PBU FS 3 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition July -2013 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected O PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 1,185 9. Flared or vented more than 1 hour (see instr.) 517 10. Pilot and Purge 23,859 11. Assist Gas 246 12. Fuel gas used in lease operations. 639,179 13. Other (see instructions) 0 Official Use Only Authorization >1 hrMCF Safety J- �-- 14. TOTAL VOLUME (ITEMS 6-12) 664,986 Lease Use MCF 15, NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: CGF 663,038 18. Transferred to: (Express as a negative #) CGF -18,592,588 Commissioner Date 19. Remarks: I hereby certify that th,pioregoing is true and correct to the best of my knowledge. N Signature '{ Title Manager Production Taxes and Ro allies Alaska ote: All volumes must be corrected to pressure of 14.65 Asia and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235. t�Lr' q/j31�3 Forth 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT- FS -3 GAS FLARING INCIDENT REPORT July 2013 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr TOTAL Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT&CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT&CAUSE ACTION TAKEN TO ELIMINATE CAUSE 7/8/2013 0535-0540 240 See attachments See attachments 7/23/2013 0235-0240 60 7/25/2013 0532-0552 419 7/27/2013 0742-0819 466 TOTAL 1,185 Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 7/16/2013 0959-1220 63 See attachments See attachments 7/16/2013 1050-1220 229 7/29/2013 1500-1630 225 TOTAL 517 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events > 1 Hour 0 Planned Events< l hourand not 1,185 exceedini 5,000 MCF Planned Events> 1 hour or 517 exceeding, 5,000 MCF Pilot Purge 23,859 Assist 246 TOTAL FLARED VOLUME 25,807 Page 6 8/12/2013 2:34 PM Flare StartDate 07/01/2013 Flare End Date 07/31/2013 FS3 Flare Report Total Volume (MSCF) 1702 Report Numbs System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 13-346 Controlled Blowdown 07/05/2013 5:35:OOam 5:40:00 am 5min No No Yes BP1\BOUWKA 240 Determination Cause Shut Down 1806 Big AL due to lack of A/L users Action Taken Completed shutdown. 13-353 Controlled Blowdown 07/16/2013 9:59:00 am 12:20:00 pm 141 min No No Yes BP1\THOMASA 63 Determination Cause 14D common line depressuring for future be ins to 14B/C Common line. Action Taken Finished depressuring common line. 13-353 Controlled Blowdown 07/16/2013 10:50:00 am 12:20:00 pm 90 min No No Yes BPI\THOMASA 229 Determination Cause 14B/C common line depressured for make piggable / inspectable tie ins. Action Taken Finished depressuring. 13-361 Controlled Blowdown 07/23/2013 2:35:00 am 2:40:00 am 5 min No No Yes BP1\DONATR 60 Determination Cause 1803 LPS T/C normal shutdown due to low rates. Action Taken Completed normal shutdown of TIC. 13-366 Other 07/25/2013 5:32:00 am 5:52:00 am 20 min No No Yes BP10ONATR 419 Determination Cause Depressured the WOA AL line from FV3751 to F448/748AV to allow drilling rig critical lift. Action Taken Completed the depressurization and lift. 13-369 Other 07/27/2013 74200am 8:19:00 am 37 min No No Yes BPI OONATR 466 Determination Cause Depressured the WOA AL line from FV3751 to F448f748AV to allow drilling rig to be lifted overthe line Action Taken Completed the lift and stopped depressurization. 13-374 Controlled Blowdown 07/29/2013 3:00:00 pm 4:30:00 pm 90 min No No Yes BPI\LOGANPD 225 Determination Cause 14B/C CL depressure for pigging spool removal Action Taken Completed depressuring. Total Volume (MSCF) 1702 Generated 08/07/2013 11:29:06AM Page 8 of 11 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000030 2. Facility Name PBU FS 3 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition I Au ust-2013 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected O PRUDHOE 640150 100.00% B. Flared or vented 1 hour or less 9,803 9. Flared or vented more than 1 hour (see instr.) 542 10. Pilot and Purge 24,358 11. Assist Gas 1,782 12. Fuel gas used in lease operations. 836,830 13. Other (see instructions) U Official Use Only Authorization>1 hr Safety C /1Z ✓ "7 MCF 14. TOTAL VOLUME (ITEMS 6-12) 873,315 Lease Use MCF 15. NGL Gas Equivalent U Conservation MCF 16. Purchased gas UW aste: MCF 17. Transferred from: CGF 861,188 , / ! _ 7 r / _ / --� V Commissioner Date 18. Transferred to: (Express as a negative #) CGF -24,461,224 19. Remarks: I hereby certify that t foregoing is true and correct to the best of my knowledge. Iq Note: All volumes must be corrected Signature. Title Title Mana er Production Taxes and Royaltig Alaska to pressure of 14.65 psia and to a l! temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date / 7 AAC25.235. VLF �d3114- Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - FS -3 GAS FLARING INCIDENT REPORT Page 5 August 2013 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 8/20/2013 1259-1305 3 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr 8/20/2013 1309-1400 12 8/26/2013 1450-1545 9,329 TOTAL 9,344 Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 8/20/2013 1300-1422 342 See attachments See attachments TOTAL 342 8/1/2013 0330-0400 26 See attachments See attachments 8/3/2013 2102-2115 75 8/4/2013 1715-1730 80 8/9/2013 0430-0435 3 8/13/2013 1433-1453 269 8/21/2013 1500-1535 6 TOTAL 459 Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 8/6/2013 1114-1315 200 See attachments See attachments TOTAL 200 TOTAL Unplanned Events < 1 Hour 9,344 Unplanned Events> 1 Hour 342 Planned Events< l hour and not 459 exceeding 5,000 MCF Planned Events> 1 hour or 200 exceeding 5,000 MCF Pilot Purge 24,358 Assist 1,782 TOTAL FLARED VOLUME 36,485 9/12/2013 3:32 PM Flare StartDate 08/0112013 Flare End Date 08/31/2013 FS3 Flare Report Total Volume (MSCF) 10345 Report Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 13-377 Controlled Blowdown 08/01/2013 3:3000 am 4:00:00 am 30 min No No Yes BPI\THOMASA 26 Determination Cause Depressure 14B/C common line for pig receiver removal. Action Taken Completed depressudng. 13-385 Controlled Blowdown 08/03/2013 9:02:00 pm 9:15:00 pm 13 min No No Yes BPI\THOMASA 75 Determination Cause 1806 compressor startup. Action Taken Completed 1806 wmpressor start up. 13-388 Controlled Blowdown 08/0412013 5:15:00 pm 5:30:00 pm 15 min No No Yes BP1\BOUWKA 80 Determination Cause 1803 Compressor Normal Startup Action Taken Completed 1803 Compressor Normal Start up 13-391 Controlled Blowdown 08/0612013 11:14:00 am 1:15:00 pm 121 min No No Yes BPI\THONIASA 200 Determination Cause Depressured 13Dwmmon line. Action Taken Finished depressudng common line. 13-398 Controlled Blowdown 08/09/2013 4:30:00 am 4:35:00 am 5 min No No Yes BPI\THOMASA 3 Determination Cause Normal stop for 1802 SN/IP compressor. Action Taken 1802 finished tlepressudng. 13407 Controlled Blowdown 08/13/2013 2:33:00 pm 2:53:00 pm 20 min No No Yes BP1\BOUWKA 269 Determination Cause Depressure FS112 A/L Tie Line from 491 to 457 psi for line lifts. Need to keep below 500 psi Action Taken Completed tlepressudng. 13-424 Other 08/20/2013 1:00:00 pm 2:22:00 pm 82 min No No No BP1\DONATR 342 Determination Cause While attempting to start 1801 T/C, the COSD and IP Suction Scrubber flare vent valves opened to relieve system until 1802 T/C started. Action Taken After three failed attempts to start 1801, we started 1802 T/C one start. 13-427 Controlled Blowdown 08/21/2013 3:00:00 pm 3:35:00 pm 35 min Yes Determination Cause 1801 started (one start) and loaded. 1802 unloaded and normal stop. Action Taken Purge and depressum complete. No Yes BP hGARSKEH 6 Generated 09/04/2013 10:13:15AM Page 5 of 12 Flare Start Date 08/01/2013 Flare End Date 08131/2013 Total Volume (MSCF) 10345 Generated 09/04/2013 10:13:16AM Page 6 of 12 Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Sunday, August 18, 2013 8:57 AM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Burgess, David H; AK, OPS FS3 Facility OTL; AK, OPS FS3 OSM; AK, HSSEE Env Adv East Subject: Gas flaring event at FS3 To: Jennifer Hunt, AOGCC ienniter.hunt(aalaska.gov CC: Dave Roby, AOGCC dave.roby(o)alaska.gov From: Travis Rybicki, GPB Production Optimization Team Leader CC: Victoria Ferguson, AOGCC victoria.ferguson(o)alaska.gov A flaring event occurred at FS3 starting at 08/06/2013 11:14 and stopping at 08/06/2013 13:15 with a volume of 200 (MSCF). The event lasted for 121 minutes. Flaring was due to the need to depressure the 13D Common Line for planned project work. Flaring ended when the planned depressuring activities were completed and the flare valves closed. Please let me know if you have any questions. Travis M. Rybicki PCC•EOC (Production Optimization) Team Lead Office 907-659-4472 (BOC) 659-5566 (PBOC) Cell 907-748-2118 Harmony 7584404 GPB Pager 907-659-5272 # 1890 akol)spcceoctl(ibp. Com Alternate: Kellie Okonek Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com) Sent: Sunday, August 25, 2013 11:06 PM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; AK, HSSEE Env Adv West; AK, OPS GC2 Facility OTL; AK, OPS GC2 OSM; AK, OPS GC3 Facility & Field OTL; AK, OPS GC3&PCC OSM; AK, OPS FS3 OSM; AK, OPS FS3 Facility OTL; Burgess, David H; AK, HSSEE Env Adv East Subject: Gas flaring events at GC1, GC2, GC3, FS3 To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC iennifer.huntCcbalaska.aov dave.robvaa alaska.gov victoria.ferouson(oilalaska.gov From: Kellie Okonek, GPB Production Optimization Team Leader A flaring event occurred at GC2 starting at 08/25/2013 00:00 and stopping at 08/25/2013 13:00 with a volume of 7583 (MSCF). The event lasted for 780 minutes. The event had a volume greater than 5000 (MSCF) and was due to flaring off the LPS compressors as the transit system pressure came up during startup of gas lifted rate. A flaring event occurred at GC2 starting at 08/24/2013 13:24 and stopping at 08/25/2013 with a volume of 6448 (MSCF). The event lasted for 636 minutes. The event had a volume greater than 5000 (MSCF) and was due to flaring off the IP/LP compressors for operational stability as GILT was ramping back up. A flaring event occurred at GCI starting at 08/24/2013 00:24 and stopping at 08/24/2013 20:52 with a volume of 7826 (MSCF). The event lasted for 1228 minutes. The event had a volume greater than 5000 (MSCF) and was due to final depressurization of the GT -13 for planned inspections. A flaring event occurred at GC1 starting at 08/23/2013 19:45 and stopping at 08/24/2013 with a volume of 980 (MSCF). The event lasted for 255 minutes and was due to depressurization of the GT -13 line for planned inspections. A flaring event occurred at GC3 starting at 08/24/2013 00:00 and stopping at 08/24/2013 15:30 with a volume of 2000 (MSCF). The event lasted for 930 minutes and was due to depressurization of GT -13 for planned inspections. Flaring stopped when pressure reduced to below 250 psig. A flaring event occurred at FS3 starting at 08/20/2013 13:00 and stopping at 08/20/2013 14:22 with a volume of 342 (MSCF). The event lasted for 82 minutes and was due to STV/IP compressor 1801 having operational issues. Flaring stopped when operations switched to 1802. Please let me know if you have any questions. Kellie Okonek (alt. Travis Rybicki) PCC/EOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akopspcceoctlta.)bp.com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000030 2. Facility Name PBU FS 3 3. Field PBU - EOA 4, Operator BP 5. MonthNear of Disposition September -2013 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold Q Pool Name Pool Code Percent 7. Reinjected Q PRUDHOE 640150 100.00 8. Flared or vented 1 hour or less 2,657 9. Flared or vented more than 1 hour (see instr.) 772 10. Pilot and Purge 23,899 11. Assist Gas 1,629 12. Fuel gas used in lease operations. 723,899 13. Other (see instructions) Q Official Use Only Authorization >1 hr Safe fY �a Z a MCF 14. TOTAL VOLUME (ITEMS 6-12) 752,856 Lease Use MCF 15. NGL Gas Equivalent p Conservation MCF 16. Purchased gas Q Waste: MCF 17. Transferred from: CGF 747.798 n / (p 18. Transferred to: (Express as a negative #) CGF -19,936,160 Commissioner Date 19. Remarks: I hereby certify that th//he��� foregoing is//true and correct to the best of my knowledge . ��n y)� / iYl�nr t, Note: All volumes must be corrected Signature CIA' ' l�/�/f�{/� Title Mana er Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a /11 !1 temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date (J f� AAC25.235. V�--/-- 1,13/Iq Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate DATE 9/20/2013 9/20/2013 9/26/2013 9/26/2013 9/26/2013 1550-1555 1605-1610 0230-0232 0405-0407 0500-0502 TOTAL BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT -FS -3 GAS FLARING INCIDENT REPORT September 2013 DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 240 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr 155 3 3 3 404 See attachments See attachments TOTAL 0 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE 9/8/2013 9/12/2013 9/12/2013 9/12/2013 9/12/2013 9/14/2013 9/14/2013 9/19/2013 9/19/2013 9/24/2013 9/30/2013 9/30/2013 9/30/2013 9/30/2013 9/30/2013 1500-1505 0130-0135 0945-1030 1545-1620 1755-1830 1537-1545 1540-1630 1720-1735 1905-1915 0730-0735 1030-1115 1445-1510 1520-1535 1615-1710 2000-2005 TOTAL 3 See attachments 60 643 44 215 60 743 43 21 3 89 80 80 109 60 2,253 See attachments Page 5 10/11/2013 8:58 AM Events 9/17/2013 9/22/2013 9/29/2013 1 Hour OR > 5,000 1414-1551 1420-1540 1600-1900 TOTAL Unplanned Events < 1 Hour Unplanned Events > 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT- FS -3 GAS FLARING INCIDENT REPORT September 2013 74 See attachments 60 638 772 TOTAL 404 0 2,253 r&Z 23,899 1,629 28,957 CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments Page 6 10/11/2013 8:58 AM Flare Start Date 09/01/2013 Flare End Date 09/302013 FS3 Flare Report Total Volume (MSCF) 3429 Report Numbs System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 13-049 Controlled Slowdown 09/08/2013 3:00:00 pm 3:05:00 pm 5 min No No Yes BP1\THOMASA 3 Determination Cause 1801 compressor skid normal stop. Action Taken Completed shutdown. 13-455 Controlled Blowdown 09/12/2013 1:30:00 am 1:35:00 am 5 min No No Yes BP7\DONATR 60 Determination Cause 1803 TIC normal shutdown due to low gas rates from the shutdown of 7C/15C Commonline. Action Taken Completed the shutdown/blowdown sequence. 13-455 Controlled Blowdown 09/12/2013 9:45:00 am 10:30:00 am 45 min No No Yes BP7\DONATR 643 Determination Cause Depressured the 7C/15C Commonline for pigging spool installation. Action Taken Completed the depressurization of 7C/1 5C Commonline. 13-455 Controlled Blowdown 09/12/2013 3:45:00 pm 4:20:00 pm 35 min No No Yes BP1\DONATR 44 Determination Cause Depressured 7B and 7D Commonline to Flare to isolate the Drillsite for 7C/15C pigging spool installation.(22msof for each CL) Action Taken Completed the depressurization of 7B and 7D Commonline. 13-455 Controlled Blowdown 09/12/2013 5:55:00 pm 6:30:00 pm 35 min No No Yes BPMONATR 215 Determination Cause Depressured 15B and 15D Commonline to isolate the Drillsite for 7C/1 5C pigging spool Installation. (78ni for 156 and 137mscf for 15D CL) Action Taken Completed the depressurization of the Commonlines. 13-062 Controlled Blowdown 09/14/2013 3:37:00 pm 3:45:00 pm 8 min No No Yes BP1\DONATR 60 Determination Cause 1803 TIC Shutdown after FS1 Tieline sweep due to low rates. Action Taken Completed the 1803 Shutdown sequence. 13 462 Controlled Slowdown 09/14/2013 3:40:00 pm 4:30:00 pm 50 min No No Yes BP1\DONATR 743 Determination Cause Depressured the FS1 Tieline for pigging spool installation. Starting pressure at 170 psi. Action Taken Completed the depressurization of the FS1 Tieline. 13-466 Controlled Blowdown 09/17/2013 2:14:00 pm 3:51:00 pm 97 min No No Yes BP1\DONATR 74 Determination Cause Depressured 6B Commonline to remove the blinds on 6D CL after pigging spools were installed. (Starting pressure at 175psi) Action Taken Completed the depressurization of 6B CL. 13-475 Controlled Blowdown 09/19/2013 5:20:00 pm 5:35:00 pm 15 min No No Yes BPt\DONATR 43 Determination Cause 6D Commonline depressured to maintain it below 50psi until it gets QC'd after bringing up DS6. Action Taken Completed the depressurization of 60 CL. 13-475 Controlled Blowdown 09/19/2013 7:05:00 pm 7:15:00 pm 10 min No No Yes BP10ONATR 21 Determination Cause 6D Commonline depressured to maintain it below 50psi until it gets QC'd after bringing up DS6. Action Taken Completed the depressurization of 6D CL. Determination Cause Generated 10/022013 9:20:43AM Page 5 of 10 Flare Start Date 09/01/2013 Flare End Date 09/30/2013 Action Taken 13-480 Controlled Blowdown 09/22/2013 2:20:00 pm 3:40:00 pm 80 min No No Yes BP1\GARSKEH 60 Determination Cause Depressure CL 6D to install pigging launcher at DS end, due to leaking valve. Action Taken 6D was depressured enought to Install spool. 13-484 Controlled Blowdown 09/24/2013 7:30:00 am 7:35:00 am 5 min No No Yes BPI\GARSKEH 3 Determination Cause Attempted start on 1801, shut down on vibration as it was going to ilde speed. Action Taken Blowdown complete. Total Volume (MSCF) 3429 Generated 10/02/2013 9:20:43AM Page 6 of 10 13-500 Other 09/29/2013 4:00:00 pm 7:00:00 pm 180 min Yes No Yes BP1\W ELBORD 638 Determination Cause 1803Waterwash Action Taken Completed water wash of 1803 compressor 13-501 Controlled Blowdown 09/30/2013 10:30:00 am 11:15:00 am 45 min No No Yes BP1\BOUWKA 89 Determination Cause Depressure 6D CIL to remove pig launcher & receiver Action Taken Completed depressudng. 13-501 Controlled Blowdown 09/30/2013 2:45:00 pm 3:10:00 pm 25 min No No Yes BPl\BOUWKA 80 Determination Cause Failed start on 1803 Action Taken Completed depressudng. 13-501 Controlled Blowdown 09/30/2013 3:20:00 pm 3:35:00 pm 15 min No No Yes BP1\B0UWKA 80 Determination Cause Failed start on 1803 Action Taken Completed depressuring. 13501 Controlled Blowdown 09/30/2013 4:15:00 pm 5:10:00 pm 55 min No No Yes BP1\BOUWKA 109 Determination Cause Started 1803, let it fire to warm up Action Taken Loaded LPS TIC. 13-501 Controlled Blowdown 09/30/2013 8:00:00 pm 8:05:00 pm 5 min No No Yes BP1\WELBORO 60 Determination Cause Normal stop on 1804 TIC for maintenance Action Taken Completed shutdown of 1804 TIC Total Volume (MSCF) 3429 Generated 10/02/2013 9:20:43AM Page 6 of 10 Hunt, Jennifer L (DOA) From: AK, OPS PCC EOG TL [AKOPSPCCEOCTL@bp.coml Sent: Sunday, September 01, 2013 2:31 PM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; AK, HSSEE Env Adv West; AK, OPS FS3 OSM; AK, OPS FS3 Facility OTL; Burgess, David H; AK, HSSEE Env Adv East; AK, OPS FS2 Facility OTL; AK, OPS FS2 OSM Subject: Gas flaring events at GC1, FS2, so To: Jennifer Hunt, AOGCC ien niter. h u nt(aalaska.gov CC: Dave Roby, AOGCC dave. robv(a)alaska. aov From: Kellie Okonek, GPB Production Optimization Team Leader CC: Victoria Ferguson, AOGCC victoria. ferouson( alaska.gov A flaring event occurred at FS2 starting at 08/31/2013 15:31 and stopping at 08/31/2013 17:50 with a volume of 18 (MSCF). The event lasted for 139 minutes and was due to depressurization of 16D commonline for planned removal of temporary pigging facilities. Flaring stopped when depressurization complete. A flaring event occurred at GC1 starting at 08/26/2013 11:05 and stopping at 08/26/2013 16:35 with a volume of 320 (MSCF). The event lasted for 330 minutes and was due to swapping of GILT machines for water washes. Flaring stopped when water washes complete. A flaring event occurred at FS3 starting at 08/26/2013 14:50 and stopping at 08/26/2013 15:45 with a volume of 9329 (MSCF). The event was a black smoke event. The event had a volume greater than 5000 (MSCF) and was due to a power outage that caused loss of T/C's 1801, 1803, & 1806 in addition to the water section, regens shipping pump, etc. Flaring stopped when the turbine/compressors were started and re -loaded after getting generator power established. Please let me know if you have any questions. Kellie Okonek (alt. Travis Rybicki) PCC/EOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akopsocceoctl(cilbp.com Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Wednesday, September 25, 2013 10:49 PM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, OPS GC1 Facility OTL; AK, OPS GCI OSM; AK, HSSEE Env Adv West; AK, OPS GC3 Facility & Field OTL; AK, OPS GC3&PCC OSM; AK, OPS FS3 OSM; AK, OPS FS3 Facility OTL; Burgess, David H; AK, HSSEE Env Adv East; AK, OPS PCC EOC TL; AK, OPS FS2 OSM; AK, OPS FS2 Facility OTL Subject: Gas flaring events at GC1, GC3, FS2, To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC jenniter.hunt(a alaska.00v dave.roby(alaska.00v victoria.ferouson(a)alaska ctov From: Kellie Okonek, GPB Production Optimization Team Leader A flaring event occurred at FS2 starting at 09/24/2013 01:00 and stopping at 09/24/2013 03:00 with a volume of 214 (MSCF). The event lasted for 120 minutes, and was due to depressurization of 9A commonline for repairs. Flaring stopped when line depressured. A flaring event occurred at FS2 starting at 09/23/2013 20:30 and stopping at 09/23/2013 23:30 with a volume of 479 (MSCF). The event lasted for 180 minutes, and was due to DS9E commonline coming down to swap blinds. A flaring event occurred at FS3 starting at 09/22/2013 14:20 and stopping at 09/22/2013 15:40 with a volume of 60 (MSCF). The event lasted for 80 minutes, and was due to depressurization of 6D commonline to install a pig launcher. Flaring stopped when line depressured. A flaring event occurred at GC1 starting at 09/18/2013 02:20 and stopping at 09/18/2013 15:00 with a volume of 220 (MSCF). The event lasted for 760 minutes, and was due to scheduled water wash on K7001. A flaring event occurred at GC3 starting at 09/18/2013 00:01 and stopping at 09/18/2013 02:00 with a volume of 413 (MSCF). The event lasted for 119 minutes, and was due to wet gas compressor shutdown due to control/instrumentation failure. Flaring stopped when WOA production was decreased. A flaring event occurred at GC3 starting at 09/17/2013 20:02 and stopping at 09/18/2013 with a volume of 826 (MSCF). The event lasted for 238 minutes, and was due to wet gas compressor shutdown due to control/instrumentation failure. Flaring stopped when WOA production was decreased. A flaring event occurred at FS3 starting at 09/17/2013 14:14 and stopping at 09/17/2013 15:51 with a volume of 74 (MSCF). The event lasted for 97 minutes, and was due to depressurization of 6B for the make-piggable project. A flaring event occurred at GCI starting at 09/16/2013 03:00 and stopping at 09/16/2013 22:30 with a volume of 6070 (MSCF). The event lasted for 1170 minutes. The event had a volume greater than 5000 (MSCF) and was due to depressurization of GT -13 in support of line lifts for inspection. Please let me know if you have any questions. Kellie Okonek (alt. Travis Rybicki) PCC/EOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akopspcceoctlabp.com Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Monday, September 30, 2013 8:33 AM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS FS3 OSM; AK, OPS FS3 Facility OTL; Burgess, David H; AK, HSSEE Env Adv East; AK, OPS PCC EOC TL; AK, OPS FS1 OSM; AK, OPS FSI Facility OTL Subject: Gas flaring events at FS1,� To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC iennifer.hunt@alaska.gov dave.robv@alaska.gov victoria.ferauson analaska.gov From: Kellie Okonek, GPB Production Optimization Team Leader A flaring event occurred at FS3 starting at 09/29/2013 16:00 and stopping at 09/29/2013 19:00 with a volume of 638 (MSCF). The event lasted for 180 minutes, and was due to 1803 water wash. Flaring stopped when the water wash was complete. A flaring event occurred at FS1 starting at 09/27/2013 00:00 and stopping at 09/27/2013 01:45 with a volume of 510 (MSCF). The event lasted for 105 minutes, and was due to TIC 1802 shutdown due to a lube oil leak on the GG. Flaring stopped when STV/IP T/C 1801 was loaded. Please let me know if you have any questions. Kellie Okonek (alt. Travis Rybicki) PCC/EOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akopsocceoctl(a)bo.com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000030 2 Facility Name PBU FS 3 3. Field PBU - EOA 4. Operator BP 5. Month a'of Disposition October -2013 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold Pool Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 1 119 9. Flared or vented more than 1 hour (see instr.) 4,521 10. Pilotand Purge 24,739 11. Assist Gas 9,546 12. Fuel gas used in lease operations. 779,773 13. Other (see instructions) 0 Official Use Only Authorization >1 hr SafetyG/ �Z / / MCF 14. TOTAL VOLUME (ITEMS 6-12) 819,698 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste. MCF 17. Transferred from: CGF 804,512 ' Commissioner Date 18. Transferred to: (Express as a negative #) CGF -25,383,412 19. Remarks: I hereby certify that the � foregoing is true and correct to the best of my knowledge. //�/ln Note: All volumes must be corrected Signature fil /rJ� c, '�'iY Title Manager Production Taxes and Ro lties Alaska to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235. x/3/14 VLF Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate Flare Start Date 10/01/2013 Flare End Date 1081/2013 FS3 Flare Report Total Volume (MSCF) 5640 Report Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 13-502 Controlled Blowdown 10/01/2013 10:15:OOam 11:00:OOam 45min No No Yes BP1\WELBORD 138 Determination Cause Depressure of 6D common line for pig launcher removal Action Taken Completed blowdown of common line 13-503 Controlled Blowdown 10/02/2013 3:15:00 pm 5:47:00 pm 152 min Yes No Yes BP1\WELBORD 635 Determination Cause 1804 TIC spin for Water wash Action Taken 1804 T/C completed water wash 13-503 Controlled Blowdown 10/02/2013 10:00:00 pm 10:05:00 pm 5 min No No Yes BP1\WELSORD 240 Determination Cause 1806 T/C Normal stop for upcoming maintenance Action Taken 1806 TIC completed shut down 13-503 Controlled Blowdown 10/02/2013 10:00:00 pm 11:59:00 pm 119 min No No Yes BP1\WELBORO 580 Determination Cause 1806 T/C spin cool Action Taken 1806 TIC completed spin cool 13-507 Flare Relief 10/03/2013 8:44:00 pm 10:39:00 pm 115 min No No Yes BP1\WELBORD 378 Determination Cause Depressured 15D C/L for isolation to remove blinds on 7C/15C CIL Action Taken Completed dpressure of 15D C/L 13-507 Flare Relief 10/03/2013 8:44:00 pm 10:39:00 pm 115 min No No Yes BP1\WELBORD 212 Determination Cause Depressured 15B C/L for Isolation to remove blinds on 7CI15C CIL Action Taken Completed dpressure of 15B C/L 13-507 Flare Relief 10/03/2013 8:44:00 pm 10:39:00 pm 115 min No No Yes BP1\WELBORD 59 Determination Cause Depressured 7B C/L for isolation to remove blinds on 7CI15C C/L Action Taken Completed dpressure of 7B C/L 13507 Flare Relief 10/03/2013 8:44:00 pm 10:39:00 pm 115 min No No Yes BP1\WELBORD 58 Determination Cause Depressured 7D C/L for isolation to remove blinds on 7C11 5C CIL Action Taken Completed dpressure of 7D C/L Daily Volume (MSCF) 707 13509 Controlled Blowdown 10/04/2013 8:00:00 pm 9:00:00 pm 60 min No No Yes BP1\WELBORD 449 Generated 11104/2013 3:38:24PM Page 8 of 13 Flare Start Date 10101/2013 Flare End Date 10/312013 Determination Cause Depressured 1806 case, suction, and discharge piping to Ops! for EIL Action Taken Completed total depressure of 1806 and blocked In flare vent valves 13-517 Controlled Blowdown 10/07/2013 12:25:00 pm 2:10:00 pm 105 min No No Determination Cause Shutdown Tin -line from FS3 to FS1 -bad grease zerk on outside block valve. Action Taken Completed depressudng. Daily Volume (MSCF) 449 Yes BPI\BOUWKA 2213 Daily Volume (MSCF) 2213 13-523 Other 10/09/2013 1:00:00 pm 2:50:00 pm 110 min No No Yes BP1\CARVERW 386 Determination Cause 1806 Turbine -Planned Waterwash and Drying Cycle for maintenance. Starting Turbine used to rotate Axile Flow Compressor/Turbine for maintenance. Action Taken Completed Waterwash and Drying Cycle. Daily Volume (MSCF) 386 Total Volume (MSCF) 5640 Generated 11/042013 3:38:24PM Page 9 of 13 Hunt, Jennifer L (DOA From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Tuesday, October 15, 2013 10:46 AM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Burgess, David H; AK, OPS FS3 Facility OTL; AK, HSSEE Env Adv East; AK, OPS FS3 OSM Subject: Gas flaring events a To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC iennifer.hunt(a)alaska.gov dave.roby( alaska.gov victoria.ferguson5alaska.gov From: Travis Rybicki, GPB Production Optimization Team Leader A flaring event occurred at FS3 starting at 10/02/2013 15:15 and stopping at 10/02/2013 17:47 with a volume of 635 (MSCF). The event lasted for 152 minutes. Flaring was due to planned spin cool of unit in preparation for planned water wash of LPS T/C 1804. Flaring continued while T/C 1804 was spin cooled. Flaring ended when T/C 1804 was cool and flare valves closed. A flaring event occurred at FS3 starting at 10/02/2013 22:00 and stopping at 10/02/2013 23:59 with a volume of 580 (MSCF). The event lasted for 119 minutes. Flaring was due to planned spin cool of unit in preparation for planned water wash of AL T/C 1806. Flaring continued while T/C 1806 was spin cooled. Flaring ended when T/C 1806 was cool and flare valves closed. A flaring event occurred at FS3 starting at 10/03/2013 20:44 and stopping at 10/03/2013 22:39 with a volume of 378 (MSCF). The event lasted for 115 minutes. Flaring was due to planned depressuring of Common Line 15D to remove isolation related to make piggable projects. Flaring ended when C/L 15D was depressured and flare valves closed. A flaring event occurred at FS3 starting at 10/03/2013 20:44 and stopping at 10/03/2013 22:39 with a volume of 212 (MSCF). The event lasted for 115 minutes. Flaring was due to planned depressuring of Common Line 156 to remove isolation related to make piggable projects. Flaring ended when C/L 15B was depressured and flare valves closed. A flaring event occurred at FS3 starting at 10/03/2013 20:44 and stopping at 10/03/2013 22:39 with a volume of 58 (MSCF). The event lasted for 115 minutes. Flaring was due to planned depressuring of Common Line 7D to remove isolation related to make piggable projects. Flaring ended when C/L 7D was depressured and flare valves closed. A flaring event occurred at FS3 starting at 10/03/2013 20:44 and stopping at 10/03/2013 22:39 with a volume of 59 (MSCF). The event lasted for 115 minutes. Flaring was due to planned depressuring of Common Line 7B to remove isolation related to make piggable projects. Flaring ended when C/L 7B was depressured and flare valves closed. A flaring event occurred at FS3 starting at 10/04/2013 20:00 and stopping at 10/04/2013 21:00 with a volume of 449 (MSCF). The event lasted for 60 minutes. Flaring was due to planned depressuring of AL T/C 1806 system piping for planned maintenance work. Flaring continued while T/C 1806 piping was depressured. Flaring ended when T/C 1806 piping was depressured and flare valves closed. A flaring event occurred at FS3 starting at 10/07/2013 12:25 and stopping at 10/07/2013 14:10 with a volume of 2213 (MSCF). The event lasted for 105 minutes. Flaring was due to unplanned shut down of the FS3-FS1 Tie Line to repair a leaking gas zerk fitting. Flaring continued while the tie line was depressured. Flaring ended when tie line was depressured and flare valves closed. A flaring event occurred at FS3 starting at 10/09/2013 13:00 and stopping at 10/09/2013 14:50 with a volume of 386 (MSCF). The event lasted for 110 minutes. Flaring was due to planned water wash of AL T/C 1806. Flaring continued while T/C 1806 was water washed. Flaring ended when T/C 1806 water wash was completed and flare valves closed. Please let me know if you have any questions. Travis M. Rybicki PCC-EOC (Production Optimization) Team Lead Office 907-659-4472 (BOC) 659-5566 (PBOC) Cell 907-748-2118 Harmony 758-4404 GPB Pager 907-659-5272 # 1890 akopspcceoctl(O7bo. com Alternate: Kellie Okonek STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000030 2. Facility Name PB FS 3 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition November -2013 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Cade Percent 7. Reinjected O PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 23,875 11. Assist Gas 14 12. Fuel gas used in lease operations. 940,926 13. Other (see instructions) 0 Official Use Only Authorization >i hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 96015 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas p Waste: MCF 17. Transferred from: CGF 964,801 Commissioner Date 18. Transferred to: (Express as a negative #) CGF -29,626,071 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Ii�IMn�6/In�� Note: All volumes must corrected Signature (� Title Manager Production Taxes and Ro hies Alaska to pressure of 14.65 psisis and to a temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000030 2. Facility Name PBU i 3 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition December -2013 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold U Pool Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 9 9. Flared or vented more than 1 hour (see instr.) 27 10. Pilot and Purge 28,421 11. Assist Gas 70 12. Fuel gas used in lease operations. 1,000,852 13. Other (see instructions) ctions) Use Only Authorization >I hr SafetyOfficial MCF 14. TOTAL VOLUME (ITEMS 6-12) 1,029,379 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: CGF 1,029,273 mmissioner CoDate 18. Transferred to: (Express as a negative #) CGF -31,487,241 19. Remarks: I hereby certify that t foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date /// J1I AAC25.235. VZ -4-- 4-l3/!Zf Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate TOTAL i BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - FS -3 GAS FLARING INCIDENT REPORT December 2013 Not required for unplanned events <=1 hr ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events <=1 hr DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 12/28/2013 1200-1800 27 See attachments See attachments TOTAL 27 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 12/29/2013 1315-1325 3 See attachments See attachments 12/29/2013 1420-1425 3 12/31/2013 1435-1440 3 TOTAL 9 DATE TOTAL Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME See attachments 0 TOTAL 0 27 9 0 28,421 70 28,527 ACTION TAKEN TO ELIMINATE See attachments Page 6 1/12/2014 10:27 AM r Flare Start Date 12/01/2013 Flare End Date 12/31/2013 FS3 Flare Report Total Volume (MSCF) 36 Report Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 13-597 Controlled Blowdown 12/28/2013 12:00:00 pm 6:00:00 pm 360 min Yes No Determination Cause Nine 1801 TIC Failed starts after compressor purge. Action Taken Stopped tring to start 1801 T/C 13-599 Controlled Blowdown 12/29/2013 1:15:00 pm 1:25:00 pm 10 min No No Determination Cause Started 1801 STVIIP T/C Action Taken Completed compressor purge on 1801 STV/IP TIC 13-599 Controlled Blowdown 12/29/2013 2:20:00 pm 2:25:00 pm 5 min No No Determination Cause Normal operational stop on 1802 STV/IP T/C Action Taken Completed shutdown. 14-1 Controlled Blowdown 12/31/2013 2:35:00 pm 2:40:00 pm 5 min No No Determination Cause 1801 STV/IP T/C normal stop Action Taken Completed shutdown. Generated 01/06/2014 95043AM No BPIIWELBORD 27 Yes BPI\WELBORD 3 Yes BPMELBORD 3 Yes BPMELBORD 3 Total Volume (MSCF) 36 Page 5 of 8 Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Tuesday, January 07, 2014 7:43 AM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Burgess, David H; AK, OPS FS3 Facility OTL; AK, OPS FS3 OSM; AK, HSSEE Env Adv East Subject: Gas flaring event at FS3 To Jennifer Hunt, AOGCC iennifer.huntna alaska.gov CC: Dave Roby, AOGCC dave. roby(5alaska.gov From: Travis Rybicki, GPB Production Optimization Team Leader CC: Victoria Ferguson, AOGCC victoria.ferguson(a)alaska. aov A flaring event occurred at FS3 starting at 12/28/2013 12:00 and stopping at 12/28/2013 18:00 with a volume of 27 (MSCF). The event lasted for 360 minutes. Flaring was due to numerous failed start attempts on TIC 1801 STV/IP compressor to enable swapping from the online unit, TIC 1802. Flaring ended when the decision was made to no longer attempt to start the TIC 1801 unit. Please let me know if you have any questions. Travis M. Rybicki PCC•EOC (Production Optimization) Team Lead Office 907-659-4472 (BOC) 659-5566 (PBOC) Cell 907-748-2118 Harmony 758-4404 GPB Pager 907-659-5272 # 1890 akopspcceoctl(cDbP. COM Alternate: Kellie Okonek