Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPBU GC 1 Gas DispositionState of Alaska AOGCC Gas Disposition Files Year: 2013 Facility: PBU GC I Operator: BP EXPLORATION (ALASKA) McMains, Stephen E (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Friday, March 01, 2013 6:57 AM To: McMains, Stephen E (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, OPS GC1 Facility OTL; AK, OPS GCI OSM; AK, HSSEE Env Adv West Subject: Gas flaring events at GC1 To: Steve McMains, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC steve.mcmainsoalaska.00v dave.roby(o)alaska.aov victoria.ferauson aoalaska.gov From: Travis Rybicki, GPB Production Optimization Team Leader A flaring event occurred at GC1 starting at 02/05/2013 00:00 and stopping at 02/05/2013 24:00 with a volume of 2760 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GC1 starting at 02/06/2013 00:00 and stopping at 02/06/2013 24:00 with a volume of 960 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GILT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GCI starting at 02/08/2013 00:00 and stopping at 02/08/2013 24:00 with a volume of 3700 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GC1 starting at 02/10/2013 00:00 and stopping at 02/10/2013 24:00 with a volume of 4166 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GC1 starting at 02/11/2013 00:00 and stopping at 02/11/2013 24:00 with a volume of 4970 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GC1 starting at 02/21/2013 00:01 and stopping at 02/21/2013 06:23 with a volume of 6980 (MSCF). The event lasted for 382 minutes. Flaring was due to a failed power supply on the OT -28 (oil transit line) PLC which caused the shutdown of oil shipping pumps and associated production banks. Flaring continued while the power supply was replaced, production banks were restarted and flare valves went closed one plant stabilized. A flaring event occurred at GC1 starting at 02/25/2013 00:00 and stopping at 02/25/2013 24:00 with a volume of 2539 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GC1 starting at 02/26/2013 00:00 and stopping at 02/26/2013 24:00 with a volume of 3386 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GC1 starting at 02/27/2013 00:00 and stopping at 02/27/2013 24:00 with a volume of 4330 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GC1 starting at 02/28/2013 00:00 and stopping at 02/28/2013 24:00 with a volume of 4020 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. Please let me know if you have any questions. Travis M. Rybicki PCC-EOC (Production Optimization) Team Lead Office 907-659-4472 (BOC) 659-5566 (PBOC) Cell 907-748-2118 Harmony 758-4404 GPB Pager 907-659-5272 # 1890 akoosocceoctl(a)bo. com Alternate: Kellie Okonek STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED r2As n1SPnS1T1r)M 1. Facility Number 2. Facility Name 0290000031 PBU GC 1 Disposition 3. Field PBU - WOA Volume MCF 4. Operator 5. Month/Year of Disposition 14,pJanua -2013 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected p PRUDHOE 640150 99,820/ LISBURNE 640144 0.00% 8. Flared or vented l hour or less 4,967 MIDNIGHT SUN 640158 0.18% PT MCINTYRE 640180 0.00% 9. Flared or vented more than 1 hour (see instr.) 112,292 10. Pilot and Purge 63,342 11. Assist Gas 0 12. Fuel gas used in lease operations. 810,474 13. Other (see instructions) 0 ._Official [Use Qnly Authorization>1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6.12) 991,075 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: U Commissioner Date 18. Transferred to: (Express as a negative #) CGF -73,268,977 19. Remarks: I hereby certify that t foregoing is true and correct to the best of my knowledge. �/ xes and Ro alNote: All volumes must be corrected Signature Title Manager Production Talies Alaska to pressure of 14.65 psia and to a temperature of 600 F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT January 2013 jUnplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 1/7/2013 0105-0155 4,557 Not required for unplanned events <= 1 hr Not required for unplanned events <=1 hr TOTAL 4,557 1/3/2013 0000-2400 4,740 See attachments See attachments 1/5-31/2013 0000-2400 107,552 TOTAL 112,292 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 1/10/2013 0913-0933 410 See attachments See attachments TOTAL 410 Planned Events Exceeding 1 Hour OR> 5,000 mcf See attachments TOTAL 0 L See attachments Page 6 2/13/2013 3:46 PM TOTAL Unplanned Events < 1 Hour 4,557 Unplanned Events > 1 Hour 112,292 Planned Events < 1 hour and not 410 exceeding 5,000 MCF Planned Events> 1 hour or 0 exceeding 5,000 MCF Pilot Purge .-`.- 63,342 Assist 0 TOTAL FLARED VOLUME 180,601 L See attachments Page 6 2/13/2013 3:46 PM Flare StartDate 01/012013 1320 min Yes No Flare End Date 01/31/2013 BPIISPRINGG 5670 Determination Cause GC1 Flare Report Total Volume (MSCF) 117259 Report Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 13-2 Flare Relief 01/032013 12:00:00 am 12:00:00 am 1440 min Yes No No BP7ISPRINGG 4740 Determination Cause sk-494 V-7025 blovi valve leaks by BPIISPRINGG 3760 Determination Cause Action Taken W/Oenteredto T/S / repairvalve 13-5 Flare Relief 01/05/2013 12:00:00 am 12:00:00 am 1440 min Yes No No BPIISPRINGG 5470 Determination Cause sk494 V-7025 blowcese valve leaks by Action Taken W/O entered to T/S / repairvalve 13-10 Other 13-7 Flare Relief 01/062013 12:00:00 am 12:00:00 am 1440 min Yes No No BPIISPRINGG 4350 Determination Cause sk-494 V-7025 blowcase valve leaks by BPIUONESCC 4680 Determination Cause Action Taken W/O entered to T/S / repair valve 13-8 Flare Relief 01/07/2013 2:00:00 am 12:00:00 am 1320 min Yes No No BPIISPRINGG 5670 Determination Cause sk-494 V-7025 blowrase valve leaks by Action Taken W/Oenteredto T/S / repairvalve 13-9 Flare Relief 01/08/2013 12:00:00 am 12:00:00 am 1440 min Yes No No BPIISPRINGG 3760 Determination Cause sk-494 V-7025 blowcase valve leaks by Action Taken W/Oenteredto T/S / repairvalve 13-10 Other 01/09/2013 12:00:00 am 12:0000 am 1440 min Yes No No BPIUONESCC 4680 Determination Cause Unknown flaring, source not found. Action Taken Look for source of Flaring. Volume based on FOIT-01-7446T. 13-11 Other 01/10/2013 12:00:00 am 12:00:00 am 1440 min Yes No No BPIUONESCC 4810 Determination Cause FOIT-01-74467 out of calibration. Action Taken Input work requestto calibrate FT-ot-7446. 13-11 Controlled Blovii 01/10/2013 9:13:00 am 9:33:00 am 20 min No No Yes BPIUONESCC 410 Determination Cause Lower T -bank pressurefrom HP to LP. Action Taken Closed T -bank Rare valve. Volume based on FOR -01-7446T. 13-13 Other 01/11/2013 12:00:00 am 11:59:00 pm 1439 min Yes No No BPIIKIRSCHW 2920 Determination Cause unknown leak K-3300 GLT Action Taken looking over compressor for faultyReaking equipment 13-15 Other 01/12/2013 12:00:00 am 12:00:00 am 1440 min Yes No No BPIUONESCC 3470 Determination Cause Unfound flare source. Suspect FIT -01-7446T calibration error. Generated 02/04/2013 3:64:59PM Page 6 of 10 Flare StartDate 01/01/2013 Flare End Date 01/31/2013 Action Taken Reference work order 43305922 13-14 Omer 01/13/2013 12:00:00am 11:59:00 pm 1439 min No No No BPIUORSCHW 4560 Determination Cause unidentified leak into Bare header Action Taken exhaustive search ongoing for leaking psJs , flare valves etc... Generated 02/04/2013 3:54:59PM 13-16 Other 01/14/2013 12:00:00 am 12:00:00 am 1440 min Yes No No BP1\BIFFERDL 6010 Determination Cause Unidentified soure leaking to Bare. Action Taken Ongoing search for leak to flare, checking Bare valves,PSVs act. 13-19 Other 01/15/2013 12:00:00 am 12:00:00 am 1440 min Yes No No BP1\SPRINGG 5390 Determination Cause Unidentified source leaking to flare. Action Taken Ongoing search for leak to flare, checking flare vaNes,PSVs act. 13-20 Other 01/16/2013 12:00:00 am 1200:008M 1440 min No No No BP1\HELMIGBJ 4610 Determination Cause Unidentified source leaking to flare. Action Taken Leaking source not identified yet. 13-22 Other 01/17/2013 12:00:00 am 11:59:00 pm 1439 min Yes No No BPi\HELMIGBJ 3200 Determination Cause Unidentified source leaking to Bare. Action Taken Leaking source not identified yet. 13-24 Other 01/18/2013 12:00:OOam 12:00:OOam 1440 min Yes No No BP1\HELMIGBJ 2900 Determination Cause Unidentified leaking source to flare. Action Taken Leaking source not identified yet. 13-27 Other 01/19/2013 12:00:00 am 120000 am 1440 min Yes No No BPI\HELMIGBJ 3500 Determination Cause Unidentified leaking source to Bare. Action Taken Still looking for leak source. 13-29 Other 01/20/2013 12:OO:00am 12:O 00am 1440 min Yes No No BPIWELMIGBJ 3680 Determination Cause Unidentified leaking source to flare. Action Taken Source not identified yet. 13-36 Other 01/21/2013 12:00:OOam 12:0000am 1440 min Yes No No BP7\HELMIGBJ 4020 Determination Cause Unidentified leaking source to flare. Action Taken Leaking source not found yet. 13-37 Other 01/22/2013 12:00:00 am 120000 am 1440 min Yes No No BPI\HELMIGBJ 4010 Determination Cause Unidentified leaking source to the flare. Action Taken Leaking source not identified yet. 13-38 Other 01/23/2013 12:00:OOam 12:00:00 am 1440 min Yes No No BP1\HELMIGBJ 3620 Generated 02/04/2013 3:54:59PM Page 7 of 10 Flare StartDate 01/01/2013 Flare End Date 01/31/2013 Determination Cause Unidentified leaking sourceto the flare Action Taken Leaking source not identified yet. 13-39 Other 01/24/2013 12:00:00 am 12:00:00 am 1440 min Yes No No BP1\SELFJR 3330 Determination Cause GAS LEAKAGE INTO FLARE SYSTEM UNIDENTIFIED SOURCE Action Taken TRYING TO DETECT SOURCE 13-41 Other 01/25/2013 12:00:00 am 12:00:00 am 1440 min Yes No No BPI\SELFJR 5290 Determination Cause GAS LEAKAGE INTO FLARE SYSTEM UNIDENTIFIED SOURCE Action Taken LEAK NOT DETECTED STILL LOOKING 13-43 Other 01/28/2013 12:00:OOam 12:00:OOam 1440 min Yes No No BP1\SELFJR 3020 Determination Cause GAS LEAKAGE INTO FLARE SYSTEM UNIDENTIFIED SOURCE Action Taken Leak trouble shooting in progress 13-45 Flare Relief 01/27/2013 12:00:00 am 12:00:00 am 1440 min Yes No No BP7\SELFJR 3040 Determination Cause GAS LEAKAGE INTO FLARE SYSTEM UNIDENTIFIED SOURCE Action Taken LEAK DETECTION ONGOING 13-47 Flare Relief 01/28/2013 12:00:00am 12:00:00 am 1440 min Yes No No BP1\SELFJR 3130 Determination Cause GAS LEAKAGE INTO FLARE SYSTEM UNIDENTIFIED SOURCE Action Taken leak detection ongoing 13-48 Flare Relief 01/29/2013 12:00:00 am 12:00:00 am 1440 min Yes No No BP1\SELFJR 2970 Determination Cause GAS LEAKAGE INTO FLARE SYSTEM UNIDENTIFIED SOURCE Action Taken leak detection ongoing 13-56 Flare Relief 01/30/2013 12:00:00 am 12:00:00 am 1440 min Yes No No BP1\SPRINGG 3122 Determination Cause GAS LEAKAGE INTO FLARE SYSTEM UNIDENTIFIED SOURCE Action Taken leak detection ongoing 13-57 Flare Relief 01/31/2013 12:00:00 am 12:00:00 am 1440 min Yes No No BP1\SPRINGG 3020 Determination Cause GAS LEAKAGE INTO FLARE SYSTEM UNIDENTIFIED SOURCE Action Taken leak detection ongoing Total Volume (MSCF) 117258 Generated 02/04/2013 3:54:59PM Paget) of 10 McMains, Stephen E (DOA) From: AK, OPS PCC EOC TL (AKOPSPCCEOCTL@bp.com) Sent: Tuesday, February 05, 2013 10:41 AM To: McMains, Stephen E (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, OPS GCI Facility OTL; AK, OPS GC1 OSM; AK, HSSEE Env Adv West -n � GC-_ I Subject: Gas flaring events at GCI �'1 To: Steve McMains, AOGCC AOGCC steve.mcmains(o' alaska.00v victoria. ferouson(Dalaska.00v CC: Dave Roby, AOGCC dave. roby(cDalaska. cov From: Travis Rybicki, GPB Production Optimization Team Leader CC: Victoria Ferguson, A flaring event occurred at GC1 starting at 01/30/2013 00:00 and stopping at 01/30/2013 24:00 with a volume of 3122 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GC1 starting at 01/31/2013 00:00 and stopping at 01/31/2013 24:00 with a volume of 3020 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GC1 starting at 02/01/2013 11:00 and stopping at 02/01/2013 14:43 with a volume of 3330 (MSCF). The intermittent event lasted for 223 minutes. Flaring was due to multiple start attempts on GLT T/C 3300. Operations needed to take the sister unit, T/C 3200 down for maintenance. Flaring continued until T/C 3300 was successfully started. A flaring event occurred at GC1 starting at 02/02/2013 00:00 and stopping at 02/02/2013 24:00 with a volume of 3340 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GC1 starting at 02/03/2013 00:00 and stopping at 02/03/2013 24:00 with a volume of 3840 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GC1 starting at 02/04/2013 00:00 and stopping at 02/04/2013 24:00 with a volume of 3540 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GILT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. Please let me know if you have any questions. Travis M. Rybicki PCC-EOC (Production Optimization) Team Lead Office 907-659-4472 (BOC) 659-5566 (PBOC) Cell 907-748-2118 Harmony 758-4404 GPB Pager 907-659-5272 # 1890 akoosocceoctl0bo. com Alternate: Kellie Okonek McMains, Stephen E (DOA) From: AK, OPS PCC EOC TL (AKOPSPCCEOCTL@bp.com] Sent: Tuesday, January 08, 2013 11:37 AM To: McMains, Stephen E (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; AK, HSSEE Env Adv West Subject: Gas flaring events at GC1 To: Steve McMains, AOGCC AOGCC steve. mcmains(@alaska.gov victoria. ferg use n(o)alaska.gov CC: Dave Roby, AOGCC dave.robv(.alaska.gov From: Travis Rybicki, GPB Production Optimization Team Leader CC: Victoria Ferguson, 6 C I A flaring event occurred at GC1 starting at 01/06/2013 00:00 and stopping at 01/06/2013 24:00 with a volume of 4350 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to a leaking blow case valve. A corrective work order was written to repair/replace the offending valve. Flaring continued into the following day as operations staff waited for repair/replacement of offending valve. A flaring event occurred at GC1 starting at 01/07/2013 02:00 and stopping at 01/07/2013 24:00 with a volume of 5670 (MSCF). The intermittent event lasted for 1320 minutes. Flaring was due to a leaking blow case valve. A corrective work order was written to repair/replace the offending valve. Flaring continued into the following day as operations staff waited for repair/replacement of offending valve. A flaring event occurred at GCI starting at 01/07/2013 01:05 and stopping at 01/07/2013 01:55 with a volume of 4557 (MSCF). The intermittent event lasted for 50 minutes. Flaring was due to the unplanned shutdown of IP Compressor K- 108. Flaring continued from the IP Compressor suction vessel until the K-107 IP Compressor unit was started. Flaring ended when K-107 was started, loaded and the Flare valves closed. Please let me know if you have any questions. Travis M. Rybicki PCC-EOC (Production Optimization) ream Lead Office 907-6594472 (BOC) 659-5566 (PBOC) Cell 907-748-2118 Harmony 758-4404 GPB Pager 907-659-5272 # 1890 a koos occeoctl (M bo. com Alternate: Kellie Okonek Kellie Okonek (alt. Travis Rybicki) PCC/EOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akopsocceoctl(oft.com McMains, Stephen E (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Saturday, February 02, 2013 7:30 PM To: McMains, Stephen E (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; AK, HSSEE Env Adv West ^ C I Subject: Gas flaring events at GC1 (� J= To: Steve McMains, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC Steve. mcmains(aalaska. gov dave. robv(c)alaska. oov victoria.fercuson &alaska.aov From: Travis Rybicki, GPB Production Optimization Team Leader A flaring event occurred at GC1 starting at 01/06/2013 00:00 and stopping at 01/06/2013 24:00 with a volume of 4350 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to a leaking blow case valve. A corrective work order was written to repair/replace the offending valve. Flaring continued into the following day as operations staff waited for repair/replacement of offending valve. A flaring event occurred at GC1 starting at 01/07/2013 02:00 and stopping at 01/07/2013 24:00 with a volume of 5670 (MSCF). The intermittent event lasted for 1320 minutes. Flaring was due to a leaking blow case valve. A corrective work order was written to repair/replace the offending valve. Flaring continued into the following day as operations staff waited for repair/replacement of offending valve. A flaring event occurred at GC1 starting at 01/08/2013 00:00 and stopping at 01/08/2013 24:00 with a volume of 3670 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to a leaking blow case valve. A corrective work order was written to repair/replace the offending valve. Flaring continued into the following day as operations staff waited for repair/replacement of offending valve. A flaring event occurred at GC1 starting at 01/09/2013 00:00 and stopping at 01/09/2013 24:00 with a volume of 4680 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A crew change occurred and this event is likely the continuation of the events noted above. A flaring event occurred at GC1 starting at 01/10/2013 00:00 and stopping at 01/10/2013 24:00 with a volume of 4810 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A crew change occurred and this event is likely the continuation of the events noted above. A WO was written to calibrate the flared gas meter to validate reported volumes. A flaring event occurred at GC1 starting at 01/11/2013 00:00 and stopping at 01/11/2013 24:00 with a volume of 2920 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GILT system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GC1 starting at 01/12/2013 00:00 and stopping at 01/12/2013 24:00 with a volume of 3470 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GILT system or other unknown source. Flaring continued into the following day as operations staff investigated the cause of the flaring event. Operations indicated suspect calibration on flared gas meter. A flaring event occurred at GCI starting at 01/13/2013 00:00 and stopping at 01/13/2013 24:00 with a volume of 4560 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GC1 starting at 01/14/2013 00:00 and stopping at 01/14/2013 24:00 with a volume of 6010 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GC1 starting at 01/15/2013 00:00 and stopping at 01/15/2013 24:00 with a volume of 5390 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GC1 starting at 01/16/2013 00:00 and stopping at 01/16/2013 24:00 with a volume of 4610 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GCI starting at 01/17/2013 00:00 and stopping at 01/17/2013 24:00 with a volume of 3200 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GC1 starting at 01/18/2013 00:00 and stopping at 01/18/2013 24:00 with a volume of 2900 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GC1 starting at 01/19/2013 00:00 and stopping at 01/19/2013 24:00 with a volume of 3500 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GC1 starting at 01/20/2013 00:00 and stopping at 01/20/2013 24:00 with a volume of 3680 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GC1 starting at 01/21/2013 00:00 and stopping at 01/21/2013 24:00 with a volume of 4020 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GC1 starting at 01/22/2013 00:00 and stopping at 01/22/2013 24:00 with a volume of 4010 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GC1 starting at 01/23/2013 00:00 and stopping at 01/23/2013 24:00 with a volume of 3620 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GCI starting at 01/24/2013 00:00 and stopping at 01/24/2013 24:00 with a volume of 3330 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GCI starting at 01/25/2013 00:00 and stopping at 01/25/2013 24:00 with a volume of 5290 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GC1 starting at 01/26/2013 00:00 and stopping at 01/26/2013 24:00 with a volume of 3020 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GILT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GC1 starting at 01/27/2013 00:00 and stopping at 01/27/2013 24:00 with a volume of 3040 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GILT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GCI starting at 01/28/2013 00:00 and stopping at 01/28/2013 24:00 with a volume of 3130 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GILT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GC1 starting at 01/29/2013 00:00 and stopping at 01/29/2013 24:00 with a volume of 2970 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GILT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. Please let me know if you have any questions. Travis M. Rybicki PCC-EOC (Production Optimization) Team Lead Office 907-659-4472 (BOC) 659-5566 (PBOC) Cell 907-748-2118 Harmony 7584404 GPB Pager 907-659-5272 # 1890 a ko os o cce octl (c).b o. co m Alternate: Kellie Okonek Kellie Okonek (alt. Travis Rybicki) PCCiEOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akopspcceoctlobp.com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DiSPORITilnN 1. Facility Number 0290000031 2. Facility Name PBU GC 1 3. Field PBU - WOA 4. Operator ... • BP 5. MonthNear of Disposition I February -2013 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected U PRUDHOE 640150 99.30% LISBURNE 640144 0.00% 8. Flaredorvented l hourorless5481 MIDNIGHT SUN 640158 0.07% PT MCINTYRE 640180 0.00% 9. Flared or vented more than 1 hour (see instr.) 116,131 10. Pilot and Purge 56,624 11. Assist Gas U 12. Fuel gas used in lease operations. 767,106 13. Other (see instructions) U .Official. Use -Only - ` Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6.12) 945,342 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas p Waste: MCF 17. Transferred from: 0 Commissioner Date 18. Transferred to: (Express as a negative #) CGF -64,753,280 19. Remarks: I hereby certify that thhe� foregoing istrue and correct to the best of my knowledge. / '/�/y%q� /� Note: All volumes must be corrected Signature M'1LG7 �' l.1/(tP1y / ' Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a da temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235. Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT February 2013 2/24/2013 1955-2020 2,500 Not required for unplanned events <= 1 hr 2/25/2013 1600-1645 1,971 2/28/2013 2106-2118 480 0001-0623 TOTAL 4,951 ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events <= 1 hr Page 6 DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 2/1-28/13 0000-2400 108,751 See attachments See attachments 2/21/2013 0001-0623 6,980 TOTAL 115,731 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 2/6/2013 0205-0223 530 See attachments See attachments TOTAL 530 Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKENTO ELIMINATE CAUSE 2/1/2013 1100-1443 400 See attachments See attachments TOTAL 400 Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME TOTAL 4,951 115,731 530 400 56,624 0 178,236 3/13/2013 9:52 AM Flare Start Date 02/01/2013 No No BPt\SPRINGG 3340 Flare End Date 02/28/2013 Action Taken leak detection ongoing GC1 Flare Report 13-61 Flare Relief 02/03/2013 12:00:00 am 12:00:00 am 1440 min Yes No No Total Volume (MSCF) 121612 Report Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 13-54 Flare Relief 02/01/2013 12:00:00 am 11:59:00 pm 1439 min Yes No No BPI\HELMIGBJ 2900 Determination Cause Valve leakage into the Flare system. Action Taken Valve leakage not identified yet. 13-54 Flare Relief 02/01/2013 11:00:00 am 2:43:00 pm 223 min No No Yes BP1\BIFFERDL 400 Determination Cause Starting GLT 3300, had to try 3 times to get it going. Took down 3200 and depresured it. Bad seat oil pump motor on 3200. Action Taken Substained fire achieved. Done with turbine swap. Action Taken leak detection ongoing 13-58 Flare Relief 02/02/2013 12:00:00 am 12:00:00 am 1440 min Yes No No BPt\SPRINGG 3340 Determination Cause GAS LEAKAGE INTO FLARE SYSTEM UNIDENTIFIED SOURCE Action Taken leak detection ongoing 13-61 Flare Relief 02/03/2013 12:00:00 am 12:00:00 am 1440 min Yes No No BP1\SPRINGG 3840 Determination Cause GAS LEAKAGE INTO FLARE SYSTEM UNIDENTIFIED SOURCE Action Taken leak detection ongoing 13-62 Flare Relief 02/04/2013 12:00:00 am 12:00:00 am 1440 min Yes No No BP1\SPRINGG 3540 Determination Cause GAs LEAKAGE INTO FLARE SYSTEM UNIDENTIFIED SOURCES Action Taken leak detection ongoing 13-64 Flare Relief 02/05/2013 12:00:00 am 12:00:00 am 1440 min Yes No No BP1\SPRINGG 2760 Determination Cause GAS LEAKAGE INTO FLARE SYSTEM UNIDENTIFIED SOURCES Action Taken leak detection ongoing 13-65 Other 02/06/2013 12:00:00 am 12:00:00 am 1440 min No No No BP1\KIRSCHW 960 Determination Cause leaking equipment to flare... search still ongoing for cause ... or possible x-mitter calibration wrong Action Taken search ongoing 13-65 Controlled Blowdown 02/06/2013 2:05:00 am 2:23:00 am 18 min No No Yes BPIUONESCC 530 Determination Cause Switched T -bank from HP to LP mode. Action Taken Achieved LP pressure. Flared volume based on FOI-01-7446T. 13-104 Flare Relief 02/07/2013 12:00:00 am 11:59:00 pm 1439 min Yes No No BPIVIELMIGBJ 3700 Determination Cause Unidentified source leaking to the flare system. Action Taken Still looking for the leak into the flare. 13-67 Flare Relief 02/08/2013 12:00:00 am 12:00:00 am 1440 min Yes No No BPt\SELFJR 3700 Determination Cause FLARE SYSTEM HAS LEAKING VALVES INTO HEADER Action Taken OPERATIONS IS LOOKING FOR A SOLUTION TO PROBLEM 13-105 Flare Relief 02/09/2013 12:00:00 am 11:59:00 pm 1439 min Yes No No BP1\HELMIGBJ 4100 Determination Cause Flare system leak not Identified yet Generated 03/07/2013 3:52:03PM Page 5 of 9 Flare Start Date 02/01/2013 Flare End Date 02/28/2013 Action Taken Ops continue looking for valve leakage. 13-69 Flare Relief 02/10/2013 12:00:00 am 12:00:00 am 1440 min Yes No No BPI\SELFJR 4166 Determination Cause Leakage into fire systme from bad valves Action Taken operations troubleshooting to Identify problem 13-71 Flare Relief 02/11/2013 12:00:00 am 12:00:00 am 1440 min Yes No No BP1\HELMIGBJ 4970 Determination Cause Unidentified leaking source to the flare. Action Taken Continue to look for leaking source. 13-106 Flare Relief 02/12/2013 12:00:00 am 11:59:00 pm 1439 min Yes No No No BPIHELMIGBJ 4900 Determination Cause Unidentified leak into the flare system. Determination Cause Unidentified leaking source to the flare system. Action Taken Leaking source not identified yet. Action Taken Leaking source not identified yet 13-107 Flare Relief 02/13/2013 12:00:00 am 11:59:00 pm 1439 min Yes No No No No BPI\HELMIGBJ 4500 Determination Cause Unidentified leaking source to the flare system. 4800 Determination Cause Unidentified leaking source to the flare system. Action Taken Source leak not identified yet. Action Taken Leaking source not identified yet 13-108 Flare Relief 02/14/2013 12:00:00 am 11:59:00 pm 1439 min Yes No No No BPIHELMIGBJ 4600 Determination Cause Unidentified leaking source to the flare sysstem. Action Taken Leaking source not identified yet. 13-109 Flare Relief 02/15/2013 12:00:00 am 11:59:00 pm 1439 min Yes Determination Cause Unidentified leaking source to the flare system. Action Taken Leaking source not identified yet. No No BPI\HELMIGBJ 5100 13-110 Flare Relief 02/16/2013 12:00:00 am 11:59:00 pm 1439 min Yes No No BP1\HELMIGBJ 4900 Determination Cause Unidentified leaking source to the flare system. Action Taken Leaking source not identified yet. 13-111 Flare Relief 02/17/2013 12:00:OOam 11:59:OOpm 1439min Yes No No BPI\HELMIGBJ 5400 Determination Cause Unidentified leaking source into the flare system. Action Taken Leaking source not identified yet. 13-112 Flare Relief 02/18/2013 12:00:00 am 11:59:00 pm 1439 min Yes No No BPI\HELMIGBJ 4700 Determination Cause Unidentified leaking source to the flare system. Action Taken Leaking source not identified yet 13-113 Flare Relief 02/19/2013 12:00:00 am 11:59:00 pm 1439 min Yes No No BP1\HELMIGBJ 4800 Determination Cause Unidentified leaking source to the flare system. Action Taken Leaking source not identified yet 13-114 Flare Relief 02/20/2013 12:00:00 am 11:59:00 pm 1439 min Yes No No BPIHELMIGBJ 3900 Generated 03/072013 3:52:03PM Page 6 of 9 Flare Start Date 02.101/2013 Flare End Date 02/28/2013 Determination Cause Unidentified leaking source to the flare system. Action Taken Leaking source not identified yet. 13-81 Flare Relief 02/21/2013 12:00:00 am 11:59:00 pm 1439 min Yes No No BP1\HELMIGBJ 2900 Determination Cause Leakage to the flare is ongoing. Action Taken Source not identified yet. 13-81 Flare Relief 02/21/2013 12:01:00 am 6:23:00 am 382 min No No No BP1\MATTRR 6980 Determination Cause Loss of power supply to OT -28 PLC caused SDV-8200 to go shut, shutting down the shipping pumps and associated banks. Action Taken PAC techs reestablished power to the PLC, then the shut down banks were restarted. 13-115 Flare Relief 02/2211013 12:00:00 am 11:59:00 pm 1439 min Yes Determination Cause Unidentified leaking source to the flare system. Action Taken Leaking source not identified yet. 13.116 Flare Relief 02/23/1013 12:00:00 am 11:59:00 pm 1439 min Yes Determination Cause Unidentified leaking source to the flare system. Action Taken Leaking source not identified yet. 13-84 Flare Relief 02/24/2013 12:00:00 am 11:59:00 pm 1439 min Yes Determination Cause Unidentified leaking source to the flare system. Action Taken Leaking source not identified yet. 13-88 Flare Relief 02/25/2013 12:00:00 am 12:00:00 am 1440 min Yes Determination Cause Flare header leakeage ongoing problem Action Taken Trouble shoofing options to find leaks No No BPI\HELMIGBJ 4500 No No BP1\HELMIGBJ 3800 No No BPI\HELMIGBJ 2500 No No BP1\SELFJR 2539 13-91 Flare Relief 02/16/1013 12:00:00 am 12:00:00 am 1440 min Yes No No BP1\FISHERCD 3386 Determination Cause Leakage into flare header Action Taken Flaring tram B-Slugcatcher bemuse of faulty flare valve positioner. Awaiting installafion of new positioner. 13-96 Flare Relief 02/27/2013 12:00:00 am 12:00:00 am 1440 min Yes No No BPI\SPRINGG 4330 Determination Cause Flare header leakeage ongoing problem Action Taken Trouble shoofing options to find leaks 13-94 Flare Relief 02/28/2013 12:00:00 am 12:00:00 am 1440 min Yes No No BP1\SPRINGG 4020 Determination Cause Flare header leakeage ongoing problem Action Taken Trouble shooting options to find leaks Generated 03/07/2013 3:52:03PM Page 7 of 9 McMains, Stephen E (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Tuesday, February 05, 2013 10:41 AM To: McMains, Stephen E (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Arthur, Gregory; Kruger, Dale O; AK, OPS GC1 Facility OTL; HSSEE Env Adv West Subject: Gas flaring events at GC1 F.� To: Steve McMains, AOGCC CC: Dave Roby, AOGCC AOGCC steve.mcmainsoalaska.gov dave robs alaska.gov victoria.ferguson (cDalaska.gov From: Travis Rybicki, GPB Production Optimization Team Leader Alejandra; Benson, Gary A; AK, OPS GC1 OSM; AK, &G -r CC: Victoria Ferguson, A flaring event occurred at GC1 starting at 01/30/2013 00:00 and stopping at 01/30/2013 24:00 with a volume of 3122 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GC1 starting at 01/31/2013 00:00 and stopping at 01/31/2013 24:00 with a volume of 3020 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GC1 starting at 02/01/2013 11:00 and stopping at 02/01/2013 14:43 with a volume of 3330 (MSCF). The intermittent event lasted for 223 minutes. Flaring was due to multiple start attempts on GLT T/C 3300. Operations needed to take the sister unit, T/C 3200 down for maintenance. Flaring continued until T/C 3300 was successfully started. A flaring event occurred at GC1 starting at 02/02/2013 00:00 and stopping at 02/02/2013 24:00 with a volume of 3340 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GC1 starting at 02/03/2013 00:00 and stopping at 02/03/2013 24:00 with a volume of 3840 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GC1 starting at 02/04/2013 00:00 and stopping at 02/04/2013 24:00 with a volume of 3540 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. Please let me know if you have any questions. Travis M. Rybicki PCC-EOC (Production Optimization) Team Lead Office 907-6594472 (BOC) 659-5566 (PBOC) Cell 907-748-2118 Harmony 758-4404 GPB Pager 907-659-5272 # 1890 akoosocceoctl cDbo.corn Alternate: Kellie Okonek McMains, Stephen E (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Monday, March 04, 2013 7:22 AM To: McMains, Stephen E (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; AK, HSSEE Env Adv West Subject: Gas flaring events at GC1 To: Steve McMains, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC steve. mcmains(a)alaska. gov dave. robv(cDalaska.gov victoria. ferguson0alaska.goy From: Travis Rybicki, GPB Production Optimization Team Leader A flaring event occurred at GC1 starting at 03/01/2013 00:00 and stopping at 03/01/2013 24:00 with a volume of 4930 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GC1 starting at 03/02/2013 00:00 and stopping at 03/02/2013 24:00 with a volume of 2760 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GC1 starting at 03/03/2013 00:00 and stopping at 03/03/2013 24:00 with a volume of 4060 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. Please let me know if you have any questions. Travis M. Rybicki PCC-EOC (Production Optimization) Team lead Office 907-659-4472 (BOC) 659-5566 (PBOC) Cell 907-748-2118 Harmony 758-4404 GPB Pager 907-659-5272 # 1890 akoDsr)cceoctl(OD,bp. Corn Alternate: Kellie Okonek McMains, Stephen E (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj Sent: Friday, March 08, 2013 11:45 AM To: McMains, Stephen E (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; AK, HSSEE Env Adv West Subject: Gas flaring events at GC1 To: Steve McMains, AOGCC steve.mcmains(@alaska.gov CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC dave.robvaalaska.gov victoria.ferouson(dalaska.gov From: Kellie Okonek, GPB Production Optimization Team Leader A flaring event occurred at GC1 starting at 02/01/2013 11:00 and stopping at 02/01/2013 14:43 with a volume of 400 (MSCF). The event lasted for 223 minutes and was due to starting GLT 3300 and shutting GLT 3200 down for maintenance. Flaring stopped when load transfer complete. A flaring event occurred at GCI starting at 02/21/2013 00:01 and stopping at 02/21/2013 06:23 with a volume of 6980 (MSCF). The event lasted for 382 minutes and was due to loss of power supply to OT -28 which caused and SDV to close, with associated s/d of shipping pumps and banks. Flaring stopped when power to the PLC was restored. The event had a volume greater than 5000 (MSCF). An intermittent flaring event has been ongoing at GC1 due to valve leakage into the flare system, for which operations continues to investigate the source of leaks: starting at 02/01/2013 00:00 and stopping at 02/01/2013 23:59 with a volume of 2900 (MSCF). The event lasted for 1439 minutes. starting at 02/07/2013 00:00 and stopping at 02/07/2013 23:59 with a volume of 3700 (MSCF). The event lasted for 1439 minutes. starting at 02/08/2013 00:00 and stopping at 02/09/2013 23:59 with a volume of 3700 (MSCF). The event lasted for 1439 minutes starting at 02/09/2013 00:00 and stopping at 02/09/2013 23:59 with a volume of 4100 (MSCF). The event lasted for 1439 minutes starting at 02/10/2013 00:00 and stopping at 02/12/2013 23:59 with a volume of 4166 (MSCF). The event lasted for 1439 minutes starting at 02/11/2013 00:00 and stopping at 02/12/2013 23:59 with a volume of 4970 (MSCF). The event lasted for 1439 minutes starting at 02/12/2013 00:00 and stopping at 02/12/2013 23:59 with a volume of 4900 (MSCF). The event lasted for 1439 minutes. starting at 02/13/2013 00:00 and stopping at 02/13/2013 23:59 with a volume of 4500 (MSCF). The event lasted for 1439 minutes. starting at 02/14/2013 00:00 and stopping at 02/14/2013 23:59 with a volume of 4600 (MSCF). The event lasted for 1439 minutes starting at 02/15/2013 00:00 and stopping at 02/15/2013 23:59 with a volume of 5100 (MSCF). The event lasted for 1439 minutes. The event had a volume greater than 5000 (MSCF). starting at 02/16/2013 00:00 and stopping at 02/16/2013 23:59 with a volume of 4900 (MSCF). The event lasted for 1439 minutes starting at 02/17/2013 00:00 and stopping at 02/17/2013 23:59 with a volume of 5400 (MSCF). The event lasted for 1439 minutes. The event had a volume greater than 5000 (MSCF). starting at 02/18/2013 00:00 and stopping at 02/18/2013 23:59 with a volume of 4700 (MSCF). The event lasted for 1439 minutes starting at 02/19/2013 00:00 and stopping at 02/19/2013 23:59 with a volume of 4800 (MSCF). The event lasted for 1439 minutes. starting at 02/20/2013 00:00 and stopping at 02/20/2013 23:59 with a volume of 3900 (MSCF). The event lasted for 1439 minutes starting at 02/21/2013 00:00 and stopping at 02/21/2013 23:59 with a volume of 2900 (MSCF). The event lasted for 1439 minutes starting at 02/22/2013 00:00 and stopping at 02/22/2013 23:59 with a volume of 4500 (MSCF). The event lasted for 1439 minutes starting at 02/23/2013 00:00 and stopping at 02/23/2013 23:59 with a volume of 3800 (MSCF). The event lasted for 1439 minutes starting at 02/24/2013 00:00 and stopping at 02/24/2013 23:59 with a volume of 2500 (MSCF). The event lasted for 1439 minutes flaring continued daily in the interim, but these reports have been sent starting at 03/04/2013 00:00 and stopping at 03/05/2013 with a volume of 4410 (MSCF). The event lasted for 1440 minutes. starting at 03/05/2013 00:00 and stopping at 03/06/2013 with a volume of 5040 (MSCF). The event lasted for 1440 minutes. The event had a volume greater than 5000 (MSCF). starting at 03/06/2013 00:00 and stopping at 03/07/2013 with a volume of 5450 (MSCF). The event lasted for 1440 minutes. The event had a volume greater than 5000 (MSCF). starting at 03/07/2013 00:00 and stopping at 03/08/2013 with a volume of 5316 (MSCF). The event lasted for 1440 minutes. The event had a volume greater than 5000 (MSCF). Please let me know if you have any questions. Kellie Okonek (alt. Travis Rybicki) PCC/EOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akopspcceoctl(abp.com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000031 2. Facility Name PBU GC 1 3. Field PBU - WOA 4.0perator BP 5. MonthlYear of Disposition March -2013 Disposition Volume MCF 20. For production from nwbipge pools, list contribution ofescb pool as a percent of Tolat Volume 6. Sold 0 Paul Name I Pool Code Percent 7- Reinjected 0 PRUDHOE 640150 ' 99.74% LISBURNE 640144 0.00% 8. Flared or vented l hour or less 0 MIDNIGHTSUN 640158 0.26% PT MCINTYRE 640160 0.00% 9. Flared or vented more Wan / hour (sea irisin) 194,364 10. Plot and Purge 62,326 11. Assist Gas 0 12. Fuel gas used in lease operations. 827,660 13. Other (see instructions) Q OIflCW Use / Authorization hr: iSafery i -' Lease Use Conservation MCF 14. TOTAL VOLUME (ITEMS 6-12) 1,084,350 MCF 15. NGL Gas Equivalent 0 MCF - 18. Purchased gas 0 Waste: MCF 17. Transferred from 0 18. Transferred to: (Express as a negative a) CGF -72,235,198 Commissioner Date 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes mustcorrected Signature__ �,/�t �T_t :'t f ' V line Manager Production Taxes brio Royalties Alaska to pressure o/ 14.65 psisia and t0 a nn temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date L' ) AAC25.235. Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate DATE BP EXPLORATION )ALASKA) INC- PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT March 2013 Not required for unplanned events <=1 hr Not required for unplanned events <=1 hr Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 3/1-31/2013 0000-2400 187,827 See attachments See attachments 3/26/2013 1628-1810 6,537 TOTAL 194,364 DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO E See attachments See attachments TOTAL Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO EUMINATE CAUSE See attachments See attachments TOTAL TOTAL Unplanned Events < 1 Hour 0 Unplanned Events> 1 Hour 194,364 Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 62,326 Assist n TOTAL FLARED VOLUME 256,690 Page 6 4/10/2013 1:30 PM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS J GC 1 3. Field DISPOSITION Dispositio a 6. Sold PBU' WOA B4 Operator BP 5 T. Reinjected 6. Flared or vented 1 hour or less 9. Flared or vented more than 1 hour (see Instr.) 10. Pilot and Purge 11. Assist Gas 12. Fuel gas used in lease operations 13. Other (see instructions) 14. TOTAL VOLUME (ITEMS 6-12) 15. NGL Gas Equivalent 6. Purchased gas 1. Transferred from: i. Transferred to: (Express as a negative k) CGF Remarks: Signature Form 10-422 Rev 512009 MY 0 775, 1,197 -65.941 INSTRUCTIONS ON REVERSE SIDE Commissioner Use rear of Dispos list contribution o/ea April -2073 Tota/ Volume. Poo/ as a 1 Date Note: All volumes must be corrected to pressure of 14.65 Asia and to t temperature of 601 F. Authority 20 n .--- INS rRUCTIONS --_ BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT April 2013 4/19/2013 VOLUME DESCRIPTIONOF INCIDECAUSE 1000-1100 NT & 1,862 Not required for unplanned events <= 1 hr TOTAL 862 4/1-30/13 voLUME-DESCRIPR TION N 0000-2400 4/22/2013 0455-0915 350,310 See attachments 10,000 TOTAL 360,310 Not required for unplanned events <= 1 hr See attachments Page 8 TOTAL wee attachments p � See attachments TOTAL ---- Unplanned Events < 1 Hour TOTAL Unplanned Events >1,862 1 Hour Planned Events < 1 hour 360,310 and not exceeding 5,000 MCF 0 Planned Events> 1 hour or exceeding 5,000 MCF 0 Pilot Purge Assist 59,384 TOTAL FLARED VOLUME 0 421,556 See attachments 5/14/2013 10:22 AM Flare Start Date 04/01/2013 Flare End Date 04/30/2013 Report GC1 Flare Report Total Volume (MSCF Numbe System Date 1 382772 Start Time Stop Time Duration Intermittent Black Smoke Planned Re o 13-153 Flare Relief 04/01/2013 12:00:00 am 12:0000 am 1440 min yes P rted BY Volume Determination Cause Valves leaking into the flare system No NO BPIISPRINGG 5470 Action Taken -__ - Ops troublshooting what valves are leaking 13-158 -_—_.. _. ._.__ ._ __._ _ Flare Relief ' - -- -- 04/02/2013 12:00:00 am 12:00:00 am 1440 min yes Daily Volume (MSCF) 5470 Determination Cause Valves leaking into the flare system No No BPIISPRINGG i C 2' Action TakenG Ops troubleshooting what valves are leaking —�� -- 13-158 Flare Relief 04/032013 Daily Volume (MSCF) l0 Z.f 12:00:00 am 12:00:00 am 1440 min yes TO Determination Cause Valves leaking into the Flare system No N0BPIISPRINGG 5760 Action Taken Ops troublshooting what valves are leaking 13-159 Flare Relief04/04/2013 12:00:00 am 4:00:00 am Daily Volume (MSCF) 5760 240 min Yes No Determination Cause Valves leaking into the flare NO BPIISPRINGG system Action Taken 2290 _ _Ops troublshooting what valves are leaking 13-159 Flare Relief --------- ____.. 04/042013 4:00:00 am 4:00:00 __ pm 720 min Yes Determination Cause GC2-1HPtie-line S/D NO ------------ N0 BPIISPRINGG ___ 0010 Action Taken Brought on GC2-1 HP tie -line 13-159 Flare Relief--- -----___ __ 04/04/2013 4:00:00 pm 12:00:00 am 480 min Yes No Determination Cause Valves leaking into the NO BP1tSPRINGG flare system 1730 Action Taken Ops troublshoofing what valves are leaking 13-161 Flare Relief� 04/052013 12:00:00 am 12:00:00 am 1440 -------'------- Daily Volume (MSCF) 14030 min yes Determination Cause Valves leaking into the flare system No No BPIISPRINGG ActionTaken Op__ troubIshoo_— what 4870 _ --S valves are leaking 13-162 Flare Relief04/062013 12:00:00 am 12:00:00 Volume (MSCF) am 1440 min Yes No Determination Cause Valves leaking into the flare NO BPIISPRINGG 4870 system Action Taken— 4490 Ops troublshooflng what valves are leaking 13-163 Flare Relief04/07/2013 12:00:00 am 12:00:00 Daily Volume (MSCF) am 1440 min yes No Determination Cause Valves leaking into the flare NO BPIISPRINGG 4490 system Action Taken 4180 Ops troublshootin ---____ 9 what valves are leaking 13-185 Flare Relief 04/062013 12:00:00 am 12:00:00 Daily Volume (MSCF) am 1440 min yes No Determination Cause Valves leaking into the flare NO BPIISPRINGG 4180 system Action Taken _ 5190 Ops troubishoofin 9 whet valves are leaking 13-186 Flare Relief 04/092013 12:0000 am 12:00:00 am Daily Volume (MSCF) 5190 1440 min Yes No Determination Cause Valves leaking into the flare No BPIISPRINGG system 5130 Genefated 05/07/2013 9:39:07AM Page 7 of 12 Flare Start Date 04/01/2013 Flare End Date 04/3012013 Action Taken Ops troublshoohmg what valves are leaking 13-167Flare Relie( 04/10/2013 12:07:00 am 12:00:00 am 1439 min Yes Daily Volume (MSCF) 5130 Determination CaUSe Valves leaking into Flare system No N0 BPi\SPINKAJD 6490 Action Taken Operators are troubleshooting along with Maintenance 13-168Flare Relief 04/11/2013 12:00:00 am 12:00:00 am 1440 min Yes Daily Volume (MSCF) 6490 Determination Cause Valves leaking into the Flareheader No NO BPIVSPINKAJD 6410 Action Taken_ _ Work Order written and troubleshooting for souroe. 13-172 Flare Relief 04/72/2013 72:00:00 am 12:00:00 am 1440 min Yes Daily Volume (MSCF) 6410 Determination Cause Leaking valves into the Flare header No NO BP715PINKAJD 8420 Action Taken Troubleshooting cause is ongoing. 13-175 Flare Relief 04/13/2073 12:00:00 am 12:00:00 am 1440 min yea Determination Cause Valves leaking into the Flare header Daily Volume (MSCF) No NO BPIISPINKAJD 8420 8830 Action Taken _ Still looking for the source. 13-176 Flare Relief 04/14/2013 12:00:00 amDaily 72:00:00 am 7440 min Yes Determination Cause Valves leaking into the Flare Heatley Volume (MSCF) No No BPIISPINKAJD 8830 6470 Action Taken Still looking for source. 73-178 Flare Relief 04/15/2013 12:00:00 am 12:00:00 am 1440 min Yes Determination Cause Valves leaking into Flare header. Daily Volume (MSCF) No No BP7ISPINKAJD 6470 5520 Action Taken Sall seeking source. 13'176Flare Relief 04/16/2013 12:00:00 am 12:00:00 am 1440 min Yes Daily Volume (MSCF) 5520 No No BP7ISPINKAJD Determination Cause Valves leaking into the Flare Header. 5750 Action Taken The hunt for the source continues. 13-180 Flare Relief 04/17/2013 12:01:00 am 11:59:00 pm 1438 min No Daily Volume (MSCF) 5750 No No BP7\MATTRR Determination Cause Valves leaking into e gore heatler. 6288 M Action Taken _ Searching to find the leaking valves. 13-187 Flare Relief 04/18/2013 12:07:00 am 11:59:00 pm 1438 min No Daily Volume (MSCF) 6268 Determination Cause Valves leaking into the flare system. No NO BP1\MATTRR 8640 Action Taken Continue looking for the leaking valves. 13-184Flare Relief 04/19/2013 12:07:00 am 11:59:001)m 1438 min No Daily Volume (MSCF) 6640 Determination Cause Valves leaking into the flare system. No NO BP1Vu1ATTRR 8446 Action Taken Troubleshooting which valves are leaking into the flare system. Generated 05/07/2013 9:39:07AM Page 8 of 12 --• ow wruv2013 Flare End Date 04/30/2013 13-186 Flare Relief 04/20/2013 12:00:00 am 12:00:OOam 1440 min Yes Determination Cause Unknown valves leaking No into gave line. Action Taken No BpluwgTTRR Trouble shooting trying to determine 18250 what valves are leaking bye. 13-790 Flare Relief_- -_--- � - 04/21/2013 12 :OO:OOam - - _-_-_- Cause Unknown 72.00 00 am 1440 min yes valves Dail V (MSCF) Y Volume MSCF) 78250 NoNo leaking into flare lines. Action Taken BP11MgTTRR Trouble shooting trying to track tl Ives what valves 25577 - are leaking by. 13-194Flare Flaruselief 04/22/2013 12:00.00am 12:00:00am1440 min Determination Cause -----------5577 Volume (MSCF) Unknown valvesDatly Yes leaking into flare lines. 25577 N° No Action Taken Tracking tlown leaking BP7IMATTRR 71800 flare valve. 13194 Flare Relief 04/22/2013 4:55:00 am 915:00 am 260 min NO Determination Cause Flared oggas No transit line Pressure due t° CGF losing Action Taken 9compressors. 5555-- - - Once gas rates were No BPIIMAT7RR 10000 _ cut and stable fl _ - _ _ - - arin 9 stoPPed. 3-202 Flare Relief- - --_- 04/23/2013 12:01:00 -- - _ --- -- S _ F - sm 11:59:00 m Determination Cause P 1438 min No - _ - - - Daily Volume (USCF) 21600 Valves leaking into the flares No No Action Taken system and Flaring due to low IP eP71MATTRR 38254 Ops trouble shootinggas rates - -- -- -- 5 5555 5 what valves are trying leaking and f f --�____- ng to stabilize gas rates 13-205 Flare Relief 04/24/2013 ---'--- i to-u�--- 12:00:00 am Determination C 12:00:00 am lggp min Cause Daily Volume (MSCF) Valves leaking into me flare No No system 39254 and flaringNo Action Taken due to low IF gas rates -----..__ trouble shooting BPIIKIRSCHW 30400 .Ops what valves are leaking and trying to stabilize gas rates 13-207 Flare Relief ----------5555__ 04/25/2013 12:00:00 am 12:00:00 am Determination Cause 1440 min No Daily Volume (MSCF) N° Valves leaking into the flare system 30400 No Action Taken and flaring due to low, lP gas rates --__ OPs trouble shooting BPIIKIRSCHW 40600 - what valves are leaking andtrying - -�_ to stabilize gas rates 13-209 -�� --� Flare Relief O412612013 72:00:00 am 12:00:00 am 1440 min No Determination Cause Daily Volume (M$CFj Valves leaking into me flare No system No and flaring due to low IP as Action Taken 9 rates OPs trouble shootin --�-----_�-_g BPIIKIRSCHW 74120 -14120 what valves am leaking and trying --___ ry g to stabilize gas rates - 9 13-211 Flare Relief ----�--- 04/27/2013 12:00:00 am12:00:00 am 7440 min Dafly Volume (MSCF) No No Valves leaking into the flare system 14120 No and flaring due to low IP gas rates Action Taken Ops trouble shooting BPIIKIRSCHW 7830 whatva-- W and trying to stabilize —ng -----gas rates 73-215 Flare Relief5555 04/28/2013 12:00:00 am12:00 _ Determination Cause:00 am 7440 min Yes Valves leaking into No Daily Volume (MSCF) 7930 the Flares ystem Action Taken NO BPIISPRINGG Ops troubl— sh—= o6ng=t valves are leaking 13580 13.217 Flare Relief 04/29/2013 12:00:00 am 12:00:00 am Determination C 1440 min Yes Cause Valves leaking into the No Daily Volume (MSCF) 13580 flares system No BPIISPRINGG Generated 05/07/2013 9:39:O7gM 12110 Page 9 of 12 McMains, Stephen E (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Saturday, April 06, 2013 8:31 AM To: McMains, Stephen E (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, OPS GCI Facility OTL; AK, OPS GCI OSM; AK, HSSEE Env Adv West Subject: Gas flaring events at GC1 To: Steve McMains, AOGCC steve. mcmainsc@alaska.gov CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC dave.robvaaalaska.gov victoria.ferousonnaalaska.gov From: Kellie Okonek, GPB Production Optimization Team Leader An intermittent flaring event has been ongoing at GCI due to valve leakage into the flare system, for which operations continues to investigate the source of leaks: at GC1 starting at 04/05/2013 00:00 and stopping at 04/06/2013 with a volume of 4870 (MSCF). The event lasted for 1440 minutes. at GC1 starting at 04/04/2013 16:00 and stopping at 04/05/2013 with a volume of 1730 (MSCF). The event lasted for 480 minutes. A flaring event occurred at GC1 starting at 04/04/2013 04:00 and stopping at 04/04/2013 16:00 with a volume of 10010 (MSCF). The event lasted for 720 minutes. The event had a volume greater than 5000 (MSCF), and was due to the GC2- GC1 HP tie -line shutdown. Flaring stopped when the line was returned to service. Please let me know if you have any questions. Kellie Okonek (alt. Travis Rybicki) PCCIEOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akoosocceoctl(@bo.com McMains, Stephen E (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Thursday, April 11, 2013 12:04 PM To: McMains, Stephen E (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; The event lasted for 1440 Arthur, Gregory, Kruger, Dale O; AK, OPS GC1 Facility OTL; AK, OPS GCI OSM; AK, HSSEE Env Adv West Subject: Gas flaring events at GC1 To: Steve McMains, AOGCC steve.mcmainsno alaska.gov CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC dave.robvaalaska.gov victoria.ferguson(c)alaska.gov From: Kellie Okonek, GPB Production Optimization Team Leader An intermittent flaring event has been ongoing at GC1 due to valve leakage into the flare system, for which operations continues to investigate the source of leaks: at GC1 starting at 04/10/2013 00:01 and stopping at 04/11/2013 with a volume of 6490 (MSCF). The event lasted for 1439 minutes. The event had a volume greater than 5000 (MSCF). at GC1 starting at 04/09/2013 00:00 and stopping at 04/10/2013 with a volume of 5130 (MSCF). The event lasted for 1440 minutes. The event had a volume greater than 5000 (MSCF). at GC1 starting at 04/08/2013 00:00 and stopping at 04/09/2013 with a volume of 5190 (MSCF). The event lasted for 1440 minutes. The event had a volume greater than 5000 (MSCF). at GC1 starting at 04/07/2013 00:00 and stopping at 04/08/2013 with a volume of 4180 (MSCF). The event lasted for 1440 minutes. at GC1 starting at 04/06/2013 00:00 and stopping at 04/07/2013 with a volume of 4490 (MSCF). The event lasted for 1440 minutes. Please let me know if you have any questions. Kellie Okonek (alt. Travis Rybicki) PCC/EOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akopspcceoctiabp.com McMains, Stephen E (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Tuesday, April 16, 2013 8:31 AM To: McMains, Stephen E (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; The event lasted for 1440 Arthur, Gregory; Kruger, Dale O; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; AK, HSSEE Env Adv West Subject: Gas flaring events at GC1 To: Steve McMains, AOGCC steve. mcmains(gbalaska.gov CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC dave.roby(dalaska.gov victoria.ferguson(oalaska.gov From: Kellie Okonek, GPB Production Optimization Team Leader An intermittent flaring event has been ongoing at GC1 due to valve leakage into the flare system, for which operations continues to investigate the source of leaks: at GC1 starting at 04/15/2013 00:00 and stopping at 04/16/2013 with a volume of 5520 (MSCF). The event lasted for 1440 minutes. The event had a volume greater than 5000 (MSCF). at GCI starting at 04/14/2013 00:00 and stopping at 04/15/2013 with a volume of 6470 (MSCF). The event lasted for 1440 minutes. The event had a volume greater than 5000 (MSCF). at GC1 starting at 04/13/2013 00:00 and stopping at 04/14/2013 with a volume of 8830 (MSCF). The event lasted for 1440 minutes. The event had a volume greater than 5000 (MSCF). at GC1 starting at 04/12/2013 00:00 and stopping at 04/13/2013 with a volume of 8420 (MSCF). The event lasted for 1440 minutes. The event had a volume greater than 5000 (MSCF). at GC1 starting at 04/11/2013 00:00 and stopping at 04/12/2013 with a volume of 6410 (MSCF). The event lasted for 1440 minutes. The event had a volume greater than 5000 (MSCF). Please let me know if you have any questions. Kellie Okonek (alt. Travis Rybicki) PCC/EOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akoosocceoctl(cabo.com From: A , TL Sent: Thursday, April 11, PM To: 'McMains, Stephen E (DOA)' Cc: 'victoria.ferguson@alaska.gov';'dave.roby@a '• Casta ; Arthur, Gregory; Kruger, Dale O; AK, OPS GCS Facility OTL; AK, OP SEE Env Adv West Subject: Gas flaring events at G mg event has been ongoing at GC1 due to valve leakage into the flare 'Sy' r which operations to investigate the source of leaks: Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Tuesday, April 30, 2013 12:37 PM To: McMains, Stephen E (DOA); Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; AK, HSSEE Env Adv West Subject: Gas flaring events at GC1 To: Jennifer Hunt, AOGCC ien n iter. h u nt(gDalaska. qov CC: Dave Roby, AOGCC dave. robyCoDalaska. qov From: Travis Rybicki, GPB Production Optimization Team Leader CC: Victoria Ferguson, AOGCC victoria.ferguson(dalaska.gov A flaring event occurred at GC1 starting at 04/17/2013 00:00 and stopping at 04/17/2013 24:00 with a volume of 6288 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GC1 starting at 04/18/2013 00:00 and stopping at 04/18/2013 24:00 with a volume of 6640 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GC1 starting at 04/19/2013 00:00 and stopping at 04/19/2013 24:00 with a volume of 8446 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GC1 starting at 04/19/2013 10:00 and stopping at 04/19/2013 11:00 with a volume of 1862 (MSCF). The intermittent event lasted for 60 minutes. Flaring was due to the shutdown of B Bank on high pressure Flaring continued while BV Bank was brought back online. Flaring ended when B Bank flare valves closed. A flaring event occurred at GC1 starting at 04/20/2013 00:00 and stopping at 04/20/2013 24:00 with a volume of 18250 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GC1 starting at 04/21/2013 00:00 and stopping at 04/21/2013 24:00 with a volume of 25577 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GCI starting at 04/22/2013 00:00 and stopping at 04/22/2013 24:00 with a volume of 11600 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GC1 starting at 04/22/2013 04:55 and stopping at 04/22/2013 09:15 with a volume of 10000 (MSCF). The intermittent event lasted for 260 minutes. Flaring was due to the unplanned shutdown tandem compressors at CGF resulting in high gas transit line pressure. Flaring continued while rate cuts were made to bring the gas transit line pressure under control. Flaring ended when flare valves closed and sufficient rate cuts were completed. A flaring event occurred at GC1 starting at 04/23/2013 00:00 and stopping at 04/23/2013 24:00 with a volume of 39254 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system and low LP/IP rates causing LP/IP system to intermittently flare rate from associated vessels. Flaring continued into the following day as operations staff investigated the cause of the flaring event and stabilize gas/oil rates. A flaring event occurred at GC1 starting at 04/24/2013 00:00 and stopping at 04/24/2013 24:00 with a volume of 30400 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to low LP/IP rates causing LP/IP system to intermittently flare rate from associated vessels. Flaring continued into the following day as operations staff worked to stabilize gas/oil rates. A flaring event occurred at GC1 starting at 04/25/2013 00:00 and stopping at 04/25/2013 24:00 with a volume of 40600 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to low LP/IP rates causing LP/IP system to intermittently flare rate from associated vessels. Flaring continued into the following day as operations staff worked to stabilize gas/oil rates. A flaring event occurred at GC1 starting at 04/26/2013 00:00 and stopping at 04/26/2013 24:00 with a volume of 14120 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to low LP/IP rates causing LP/IP system to intermittently flare rate from associated vessels. Flaring continued into the following day as operations staff worked to stabilize gas/oil rates. A flaring event occurred at GC1 starting at 04/27/2013 00:00 and stopping at 04/27/2013 24:00 with a volume of 7930 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to low LP/IP rates causing LPAP system to intermittently flare rate from associated vessels. Flaring continued into the following day as operations staff worked to stabilize gas/oil rates. A flaring event occurred at GCI starting at 04/28/2013 00:00 and stopping at 04/28/2013 24:00 with a volume of 13580 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. A flaring event occurred at GC1 starting at 04/29/2013 00:00 and stopping at 04/29/2013 24:00 with a volume of 12110 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to suspected leaking flare valve or PSV associated with the GLT system or other plant system. Flaring continued into the following day as operations staff investigated the cause of the flaring event. Please let me know if you have any questions. Travis M. Rybicki PCC•EOC (Production Optimization) ream Lead Office 907-659-4472 (BOC) 659-5566 (PBOC) Cell 907-748-2118 Harmony 758-4404 GPB Pager 907-659-5272 # 1890 a koosocceoctl Ca) b o. com Alternate: Kellie Okonek STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRomimm c,nc n1QDnc1T1l 1. Facility Number 2. Facility Name 0290000031 PBU GC 1 Disposition 3. Field PBU - WOA Volume MCF 4. Operator 5. MonthNear of Disposition BP I May -2013 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Code Percent 7. Reinjected 0 640150 99.82/ 640144 0.00% 8. Flared or vented 1 hour or less 3,490 SMIDNIGHTSUN640158 0.18% 640180 0.00% 9. Flared or vented more than 1 hour (see instr.) 54,290 10. Pilot and Purge 54,592 11. Assist Gas 0 12. Fuel gas used in lease operations. 729,046 13. Other (see instructions) Official Use Only Authorization >t hr: Safety -„ [� �t r MCF 14. TOTAL VOLUME (ITEMS 6-12) 841,418 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from. 0 T� _3 _/ 1 Co missioner Date 18. Transferred to: (Express as a negative #) CGF -66,222,544 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. b(Ji{ �I Note: All volumes must be corrected Signature Title Mana er Production Taxes and R aloes Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Dat L3 AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT May 2013 DATE TIME VOLUME DESCRIPTION OF INCIDENT&CAUSE ACTION TAKEN TO ELIMINATE CAUSE 5/5/2013 0911-0916 350 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr 5/6/2013 2350-2400 230 1501-1516 660 5/25/2013 1407-1419 600 Planned Events < 1 hour and not 1,620 5/25/2013 2016-2021 300 Planned Events> 1 hour or 5/26/2013 0937-0948 70 Pilot Purge 5/27/2013 1706-1708 40 0 5/27/2013 2105-2109 280 TOTAL 1,870 Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 5/1-7/13 0000-2400 45,310 See attachments See attachments 5/22/2013 1645-2400 320 5/23-24-13 0000-2400 500 5/30/2013 0040-0540 2,760 TOTAL 48,890 DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 5/3/2013 1547-1555 360 See attachments See attachments 5/15/2013 2100-2115 490 5/20/2013 0250-0330 110 5/28/2013 1501-1516 660 Unplanned Events> 1 Hour TOTAL 1,620 5/5/2013 0200-0600 5,080 See attachments 5/16/2013 0300-0800 320 TOTAL 5,400 TOTAL Unplanned Events < 1 Hour 1,870 Unplanned Events> 1 Hour 48,890 Planned Events < 1 hour and not 1,620 exceeding 5,000 MCF Planned Events> 1 hour or 5,400 exceeding 5,000 MCF Pilot Purge 54,592 Assist 0 TOTAL FLARED VOLUME 112,372 ACTION TAKEN TO E See attachments Page 8 6/13/2013 2:28 PM Flare Start Date 05/01/2013 Flare End Date 05/31/2013 GC1 Flare Report Total Volume (MSCF) 57780 Report Numbs System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 13-219 Flare Relief 05/01/2013 12:00:00 am 12:00:00 am 1440 min Yes Determination Cause Unidentified valves leaking into the flare system. Action Taken Leaking valves not identified yet. 13-222 Flare Relief 05/02/2013 12:00:00 am 12:00:00 am 1440 min Yes Determination Cause Valves leaking into the flare system Action Taken Ops troublshooting what valves are leaking No No BP1\SPRINGG 7120 No 13-225 Flare Relief 05/03/2013 12:00:00 am 12:00:00 am 1440 min Yes No No BP1\SPRINGG 6040 Determination Cause Valves leaking into the flare system Action Taken Ops troublshooting what valves are leaking 13-225 Flare Relief 05/03/2013 3:47:00 pm 3:55:00 pm 8 min No No Yes BP1\HELMIGBJ 360 Determination Cause Depressured GILT 3300 to flare. Pressured up for Valve PM's. Action Taken System depressured and flare valve closed. 13-229 Flare Relief 05/04/2013 12:00:00 am 12:00:00 am 1440 min Yes No No BP1\SPRINGG 6120 Determination Cause Valves leaking Into the flare system Action Taken Ops troublshooting what valves are leaking 13-230 Flare Relief 05/05/2013 12:00:00 am 12:00:00 am 1440 min Yes No No BP1\SPRINGG 6820 Determination Cause Valves leaking into the flare system Action Taken Ops troublshooting what valves are leaking 13-230 Flare Relief 05/05/2013 2:00:00 am 6:00:00 am 240 min No No Yes BPI\BIFFERDL 5080 Determination Cause Depresuring E-45 from Pad forwork on line, to test separator. Action Taken Shut flare valve and E-45 parimiter SID valve after line was down to zero presure so field could do their work. 13-235 Flare Relief 05/06/2013 12:00:00 am 12:00:00 am 1440 min Yes No No BPI\SPRINGG 5500 Determination Cause Valves leaking into the flare system Action Taken Ops troublshoofing what valves are leaking 13-236 Flare Relief 05/07/2013 12:00:00 am 12:00:00 am 1440 min Yes No No BPI\SPRINGG 9070 Determination Cause Valves leaking into the flare system Action Taken Ops troublshooting what valves are leaking Generated 06/10/2013 9:22:50AM Page 10 of 14 Flare Start Date 05/01/2013 Flare End Date 05/31/2013 13-259 Flare Relief 05/15/2013 9:00:00 pm 9:15:00 pm 15 min No No Yes BPI\MATTRR 490 Determination Cause Flared during the Planned shutdown of K-7001. Action Taken Flaring stopped when K-7001 train was depressured. 13-261 Flare Relief 05/16/2013 3:00:00 am 8:00:00 am 300 min No No Yes Determination Cause Flared oft K-7001 coppus starting motor for turbine cool down. Action Taken When turbine was cool, the starter motor was stopped and flaring stopped. 13-266 Flare Relief 05/20P2013 2:50:00 am 3:30:00 am 40 min No No Yes Determination Cause Depressured"C" slugcatcher for maintaince. Action Taken Flaring stopped when slugcatcher was depressured. SP1\MATTRR 320 BP1\MATTRR 110 13-267 Flare Relief 05/22/2013 4:45:00 pm 12:00:00 am 435 min Yes No No BPI\HELMIGBJ 320 Determination Cause Skid 50 valve closure shutdown our shipping pumps. Flared off V-136 to maintain compressor operation. Action Taken Flow rates re-established to the GC. 13-269 Flare Relief 05/23/2013 12:00:00 am 12:00:00 am 1440 min Yes Determination Cause Valves leaking into the flare system. Action Taken Leaking valves not identified yet. No Generated 06/10/2013 9:22:50AM Page 11 of 14 Flare Start Date 05/01/2013 Flare End Date 05/312013 13-268 Flare Relief 05/24/2013 12:00:00 am 12:00:00 am 1440 min Yes Determination Cause Valves leaking into the flare system. Action Taken z No No BPI\SPRINGG 250 13-280 Flare Relief 05/28/2013 3:01:00 pm 3:16:00 pm 15 min No No Yes BPI\BIFFERDL 660 Determination Cause IP and LP compressor shut down to re -install breaker for emergency Generator E-103 Action Taken Equipment was restarted at 15:16 as soon as breaker was in. flare assist gas kept smoke down. 13-284 Flare Relief 05/30/2013 12:40:00 am 5:40:00 am 300 min Yes No No BPI\SPRINGG 2760 Determination Cause Using coppus FIG to cool down economizer Action Taken closed FIG to coppus Total Volume (MSCF) 57780 Generated 06/102013 9:22:50AM Page 12 of 14 Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj Sent: Monday, May 06, 2013 7:59 AM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, OPS GCI Facility OTL; AK, OPS GCI OSM; AK, HSSEE Env Adv West; AK, OPS FS1 Facility OTL; AK, OPS FSI OSM; Burgess, David H; AK, HSSEE Env Adv East Subject: Gas flaring events at GC1 and FS1 To: Jennifer Hunt, AOGCC [ennifer.hunt@alaska.gov CC: Dave Roby, AOGCC dave.roby@alaska.eov From: Kellie Okonek, GPB Production Optimization Team Leader CC: Victoria Ferguson, AOGCC victoria.fereuson@alaska.sov An intermittent flaring event has been ongoing at GCI due to valve leakage into the flare system, for which operations continues to investigate the source of leaks: at GC1 starting at 05/05/2013 00:00 and stopping at 05/05/2013 19:55 with a volume of 6820 (MSCF). The event lasted for 1195 minutes. The event had a volume greater than 5000 (MSCF). at GC1 starting at 05/04/2013 00:00 and stopping at 05/05/2013 with a volume of 6120 (MSCF). The event lasted for 1440 minutes. The event had a volume greater than 5000 (MSCF). at GCI starting at 05/03/2013 00:00 and stopping at 05/03/2013 23:52 with a volume of 6040 (MSCF). The event lasted for 1432 minutes. The event had a volume greater than 5000 (MSCF). A flaring event occurred at GC1 starting at 05/05/2013 02:00 and stopping at 05/05/2013 06:00 with a volume of 5080 (MSCF). The event lasted for 240 minutes. The event had a volume greater than 5000 (MSCF) and was due to depressuring E-45 from E -pad for planned maintenance. Flaring stopped when line depressured. A flaring event occurred at FSI starting at 05/03/2013 17:00 and stopping at 05/03/2013 18:15 with a volume of 420 (MSCF). The event lasted for 75 minutes and was due to T/C 1801 shutdown due to valve issues. Flaring stopped when the machine was restarted and loaded. Please let me know if you have any questions. Thanks, Kellie Okonek (alt. Travis Rybicki) PCC/EOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akopspcceoctlt7obp.com Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Friday, May 03, 2013 4:09 PM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale 0; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; AK, HSSEE Env Adv West; AK, OPS FS1 Facility OTL; AK, OPS FS1 OSM; Burgess, David H; AK, HSSEE Env Adv East Subject: Gas flaring events at GC1 and FS1 To: Jennifer Hunt, AOGCC Tenn fifer. h untCa)alaska.gov CC: Dave Roby, AOGCC dave. robyealaska. gov From: Kellie Okonek, GPB Production Optimization Team Leader CC: Victoria Ferguson, AOGCC victoria.ferguson o�.alaska.gov An intermittent flaring event has been ongoing at GC1 due to valve leakage into the flare system, for which operations continues to investigate the source of leaks: at GC1 starting at 05/02/2013 00:00 and stopping at 05/03/2013 with a volume of 4640 (MSCF). The event lasted for 1440 minutes. at GCI starting at 05/01/2013 00:00 and stopping at 05/02/2013 with a volume of 7120 (MSCF). The event lasted for 1440 minutes. The event had a volume greater than 5000 (MSCF) at GC1 starting at 04/30/2013 00:00 and stopping at 05/01/2013 with a volume of 8265 (MSCF). The event lasted for 1440 minutes. The event had a volume greater than 5000 (MSCF). A flaring event occurred at FS1 starting at 05/02/2013 07:40 and stopping at 05/02/2013 10:15 with a volume of 1076 (MSCF). The event lasted for 155 minutes and was due to STV/IP compressor s/d due to a solenoid issue on the IP discharge. Flaring stopped when the problem was fixed and the compressor started and re -loaded. Please let me know if you have any questions. Thanks, Kellie Okonek (alt. Travis Rybicki) PCC/EOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akopspcceoctl()abp.com Hunt, Jennifer L (DOA From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Thursday, May 30, 2013 10:39 AM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS FS3 OSM; AK, HSSEE Env Adv East; Burgess, David H; AK, OPS FS3 Facility OTL; AK, OPS FS1 OSM; AK, OPS FS1 Facility OTL; AK, OPS CGF OTL; AK, OPS CCP CGF OSM; AK, OPS GC1 OSM; AK, OPS GCI Facility OTL; Kruger, Dale O; AK, HSSEE Env Adv West Subject: Gas flaring event at FS1, FS3, CGF, To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC lennifer.huntaalaska.aov dave.roby(d)alaska.aov victoria Ferguson aaalaska.gov From: Kellie Okonek, GPB Production Optimization Team Leader A flaring event occurred at GC1 starting at 05/30/2013 00:40 and stopping at 05/30/2013 05:40 with a volume of 2760 (MSCF). The event lasted for 300 minutes and was due to use of the copus F/G to cool down the economizer for inspection on the LPS compressor. A flaring event occurred at GC1 starting at 05/25/2013 14:07 and stopping at 05/25/2013 14:19 with a volume of 600 (MSCF). The event was a black smoke event and was due to LP/IP compressor sld for workon the emergency generator breaker. A flaring event occurred at GC1 starting at 05/24/2013 00:00 and stopping at 05/25/2013 with a volume of 250 (MSCF). The event lasted for 1440 minutes and was due to valves leaking into the flare system. A flaring event occurred at GC1 starting at 05/23/2013 00:00 and stopping at 05/24/2013 with a volume of 250 (MSCF). The event lasted for 1440 minutes and was due to valves leaking into the flare system. A flaring event occurred at GC1 starting at 05/22/2013 16:45 and stopping at 05/23/2013 with a volume of 320 (MSCF). The event lasted for 435 minutes and was due to the skid50 valve closure which shut down the GC1 shipping pumps. Flaring occurred to maintain compressor operation, and stopped when flow rates were re-established to the GC. A flaring event occurred at CGF starting at 05/29/2013 15:35 and stopping at 05/29/2013 17:00 with a volume of 16847 (MSCF). The event lasted for 85 minutes. The event had a volume greater than 5000 (MSCF) and was due to shutdown of 1805 T/C due to PCU glitch. A flaring event occurred at CGF starting at 05129/2013 08:40 and stopping at 05/29/2013 11:00 with a volume of 16847 (MSCF). The event lasted for 140 minutes. The event had a volume greater than 5000 (MSCF) and was due to a shutdown of 1855 T/C — flaring occurred while operations/maintenance worked to get the machine back online. A flaring event occurred at FS3 starting at 05/29/2013 01:45 and stopping at 05/29/2013 03:55 with a volume of 875 (MSCF). The event lasted for 130 minutes and was due to 1806 T/C cooldown for planned maintenance. Flaring stopped when cooldown was completed. A flaring event occurred at FS1 starting at 05/26/2013 16:30 and stopping at 05/26/2013 16:31 with a volume of 83 (MSCF). The event was a black smoke event. Another event occurred at FS1 starting at 05/26/2013 16:11 and stopping at 05/26/2013 16:13 with a volume of 168 (MSCF). The event was a black smoke event. A third event occurred at FS1 starting at 05/26/2013 15:51 and stopping at 05/26/2013 16:00 with a volume of 755 (MSCF). The event was a black smoke event. These events were all related to the 1803 T/C water wash gas crank sequence, including attempts at the crank sequence to investigate flare issues. Please let me know if you have any questions. Kellie Okonek (alt. Travis Rybicki) PCC/EOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akopspcceoctlabp.com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPnRiTinNI 1. Facility Number 0290000031 2. Facility Name PBU GC 1 3, Field PBU - WOA 4. Operator •5. BP Month/Year of Disposition I June -2013 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold � Pool Name Pool Code Percent 7. Reinjected p PRUDHOE 640150 99.55% LISBURNE 640144 0.00% 8. Flared or vented 1 hour or less 670 MIDNIGHT SUN 640158 0.45% PT MCINTYRE 640180 0.00% 9. Flared or vented more than 1 hour (see instr.) 3,130 10. Pilotand Purge 52,751 11. Assist Gas 12. Fuel gas used in lease operations. 693,615 13. Other (see instructions) Official Use Only Authorization >1 hr: Safety _� J7 v MCF 14. TOTAL VOLUME (ITEMS 6-12) 750,166 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: G Commissioner Date 18. Transferred to: (Express as a negative #) CGF -59,792,019 19, Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. AA—��`�� Note: All volumes must be corrected Signature J cit Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date O AAC25.235. /Z -F WI M3 Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT June 2013 jOnplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 6/12/2013 0014-0030 70 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr TOTAL 70 6/8/2013 0000-2400 530 See attachments See attachments 6/11/2013 0000-2400 40 6/14/2013 1015-1320 2,030 6/22/2013 1325-1647 130 6/28/2013 1630-1815 390 6/29/2013 1757-1910 10 TOTAL 3,130 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 6/1/2013 1645-1649 340 See attachments See attachments 6/13/2013 1350-1415 190 6/14/2013 2050-2100 70 TOTAL 600 Planned Events Exceeding 1 Hour OR > 5.000 mcf TOTAL Unplanned Events < 1 Hour Unplanned Events > 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME VVLUIVR ut]CKIP I IUN OF INCIDENT&CAUSE See attachments 0 TOTAL 70 3,130 600 0 52,751 0 56,551 ACTION TAKEN TO I See attachments Page 6 7/16/2013 11:26 AM Flare Start Date 06/01/2013 No Flare End Date 06/30/2013 BPI\MATTRR GC1 Flare Report Total Volume (MSCF) 3800 Report Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 13-289 Controlled Slowdown 06/01/2013 4:45:00 pm 4:49:00 pm 4 min No No Yes BPIUONESCC 340 Determination Cause Depressure K-51-3220 case for maintenance. Action Taken Case @ 0 psig. 13-303 Controlled Slowdown 06/08/2013 12:00:00 am 12:00:00 am 1440 min Yes No No BP7\SPINKAJD 530 Determination Cause Taps slow, down. Starting to increase rates and we are bumping the flare Action Taken Increasing rates and stabilizing the plant. BP11WRINGG 13-313 Controlled Blowdown 06/11/2013 12:00:00 am 12:00:00 am 1440 min Yes No No BP11SPINKAJD 40 Determination Cause Flaring during GILT startup, bringing on the second machine. Action Taken Startup complete. Turbine starter exhausts to the flare system. Action Taken completed testing and put back in service 13-318 Controlled Slowdown 06/13/2013 1:50:00 pm 2:15:00 pm 25 min No No Yes BPI\MATTRR 190 Determination Cause Flared to depressure K-7000 train during/after its planned shutdown. Action Taken Flaring stopped when the process train was depressured. 13-323 Controlled Blowdown 06/14/2013 10:15:00 am 1:20:00 pm 185 min Yes No No BP1\MATTRR 2030 Determination Cause Flared off of V-136 and the HP first stages due to high transit gas line pressure. Action Taken Flaring stopped when gas transit line pressure was returned to normal. 13-323 Controlled Blowdown 06/14/2013 8:50:00 pm 9:00:00 pm 10 min No No Yes BPI\MATTRR 70 Determination Cause Flared of test bank first stage to switch to LP mode. Action Taken Flaring stopped when test bank was at LP pressure. 13-333 Controlled Blowdown 06/22/2013 1:25:00 pm 4:57:00 pm 212 min Yes No No BP11WRINGG 130 Determination Cause testing shutdowns on slugoatchers Action Taken completed testing and put back in service 13-338 Controlled Blowdown 06/28/2013 4:30:00 pm 6:15:00 pm 105 min Yes No No BP1\SPRINGG 390 Determination Cause V-136 Flaring /Little Alice online; blew -down GLT-3300 after S/D Action Taken completed blowdown 13-339 Controlled Blowdown 06/29/2013 5:57:00 pm 7:10:00 pm 73 min Yes No No BPI\SPRINGG 10 Determination Cause Start-up test for K-7000 /Spin coppus for cool down Action Taken test complete -closed flare valve Total Volume (MSCF) 3800 Generated 07/09/2013 4:10:03PM Page 8 of 10 Hunt, Jennifer L DOA From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj Sent: Saturday, June 08, 2013 3:17 PM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv East; Burgess, David H; AK, OPS CGF OTL; AK, OPS CCP CGF OSM; AK, OPS GCI Facility OTL; O'Riordan, Colm J; AK, OPS PCC EOC TL; AK, OPS GC1 OSM; AK, OPS FS2 OSM; AK, OPS FS2 Facility OTL; AK, HSSEE Env Adv West; AK, HSSEE Env Adv Central; AK, OPS GC3&PCC OSM; AK, OPS GC3 Facility & Field OTL; AK, OPS FSI OSM; AK, OPS FSI Facility OTL Subject: Gas flaring events at FS2, CGF, GC3, FS1 To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC iennifer hunt(a)alaska.gov dave robv(o)alaska.gov victoria ferguson@alaska gov From: Kellie Okonek, GPB Production Optimization Team Leader A flaring event occurred at FS2 starting at 06/07/2013 07:00 and stopping at 06/07/2013 12:00 with a volume of 5545 (MSCF). The event lasted for 300 minutes. The event had a volume greater than 5000 (MSCF) and was due to depressurization of the plant for a planned B -train isolation. Flaring stopped when depressurization was complete. A flaring event occurred at CGF starting at 06/07/2013 10:52 and stopping at 06/07/2013 14:10 with a volume of 11518 (MSCF). The event lasted for 198 minutes. The event had a volume greater than 5000 (MSCF), and was due to 1855 MI compressor shutdown. Flaring stopped when troubleshooting was complete and the compressor was re -loaded and facility operations stabilized. A flaring event occurred at CGF starting at 06/02/2013 18:32 and stopping at 06/02/2013 20:10 with a volume of 12410 (MSCF). The event lasted for 98 minutes. The event had a volume greater than 5000 (MSCF), and was due to shutdown of T/C 1805 for planned maintenance to replace a failed vibration card. Flaring stopped when the card was replaced and the T/C returned to service. are now ter Previousrpessurre indicators showed 0 psighfor�the day and therefore understood the eforre upport that noe the flaring incorrect meter. The ng occurred flare header p at GC1 starting at 05/13/2013 00:00 and stopping at 05/14/2013 with a volume of 0 (MSCF). The event lasted for 1440 minutes. at GC1 starting at 05/12/2013 00:00 and stopping at 05/13/2013 with a volume of 0 (MSCF). The event lasted for 1440 minutes. at GC1 starting at 05/11/2013 00:00 and stopping at 05/12/2013 with a volume of 0 (MSCF). The event lasted for 1440 minutes. at GC1 starting at 05/10/2013 00:00 and stopping at 05/11/2013 with a volume of 0 (MSCF). The event lasted for 1440 minutes. at GCI starting at 05/10/2013 00:00 and stopping at 05/11/2013 with a volume of 0 (MSCF). The event lasted for 1440 minutes. at GC1 starting at 05/09/2013 00:00 and stopping at 05/10/2013 with a volume of 0 (MSCF). The event lasted for 1440 minutes. at GC1 starting at 05/08/2013 00:01 and stopping at 05/09/2013 with a volume of 0 (MSCF). The event lasted for 1439 minutes. A Flaring event occurred at GC3 starting at 06/07/2013 00:05 and stopping at 06/07/2013 09:00 with a volume of 2000 (MSCF). The event lasted for 535 minutes and was due to depressurization of the plant for planned TAR. Flaring stopped when depressurization complete. A flaring event occurred at FS1 starting at 06/01/2013 13:30 and stopping at 06/01/2013 16:00 with a volume of 834 (MSCF). The event lasted for 150 minutes and was due to shutdown of STV/IP 1802 compressor due to fuel gas knockout drum high level. Flaring stopped when the compressor was re -loaded. Please let me know if you have any questions. Kellie Okonek (alt. Travis Rybicki) PCC/EOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akopspcceoctlta7bp.com Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj Sent: Sunday, June 23, 2013 6:02 PM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, OPS GC1 Facility OTL; AK, OPS GCI OSM; AK, HSSEE Env Adv West Subject: Gas flaring events at GC1 To: Jennifer Hunt, AOGCC iennifer. hunt(ccDalaska.gov CC: Dave Roby, AOGCC dave.robvCa alaska.gov From: Travis Rybicki, GPB Production Optimization Team Leader CC: Victoria Ferguson, AOGCC victoria. ferguson (caalaska.gov A flaring event occurred at GC1 starting at 06/08/2013 00:00 and stopping at 06/08/2013 24:00 with a volume of 530 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due low rates at GC1 during TAPS proration resulting in intermittent flaring from the LP and IP systems. Flaring ended as rates were increased after proration was over allowing the LP/IP systems to remain loaded. A flaring event occurred at GC1 starting at 06/11/2013 00:00 and stopping at 06/11/2013 24:00 with a volume of 40 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due to flaring during startup of a GILT compressor, starting turbine exhausts to flare system. Flaring ended when GLT startup was complete. Note: Suspect duration is over- stated — however this is how event was reported. A flaring event occurred at GC1 starting at 06/14/2013 10:15 and stopping at 06/14/2013 13:20 with a volume of 2030 (MSCF). The intermittent event lasted for 185 minutes. Flaring was due to flaring off of V-136 and HP 1st Stage Separators due to high gas transit line pressure at GC1 resulting from a compressor shutdown at CGF. Flaring continued while unit at CGF was restarted and transit gas pressure returned to normal operating range, at which time flare valves closed. A flaring event occurred at GC1 starting at 06/22/2013 13:25 and stopping at 06/22/2013 16:57 with a volume of 130 (MSCF). The intermittent event lasted for 212 minutes. Flaring was due to shutdown testing on GC1 Slug Catchers. Flaring continued during testing. Flaring ended when testing was completed and flare valves closed. Please let me know if you have any questions. Travis M. Rybicki PCC-EOC (Production Optimization) Team Lead Office 907-659-4472 (130C) 659-5566 (PBOC) Cell 907-748-2118 Harmony 758-4404 GPB Pager 907-659-5272 # 1890 a ko p s p cceo ct I tcD b p. c o m Alternate: Kellie Okonek Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Sunday, July 07, 2013 6:18 PM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv East; Burgess, David H; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; AK, OPS FS2 OSM; AK, OPS FS2 Facility OTL; AK, HSSEE Env Adv West; AK, OPS GC3&PCC OSM; AK, OPS GC3 Facility & Field OTL; AK, OPS FS1 OSM; AK, OPS FS1 Facility OTL; Kruger, Dale 0 Subject: Gas flaring events at GC1, GC3, FS1, FS2 To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC iennifer.huntd)alaska.00v dave.robvaalaska.gov victoria.ferguson@.alaska.gov From: Kellie Okonek, GPB Production Optimization Team Leader A flaring event occurred at GC1 starting at 06/28/2013 16:30 and stopping at 06/28/2013 18:15 with a volume of 390 (MSCF). The event lasted for 105 minutes and was due to depressurization of spare GLT compressor when EOA Big AL was loaded. Flaring stopped when depressurization was complete. A flaring event occurred at GC1 starting at 06/29/2013 17:57 and stopping at 06/29/2013 19:10 with a volume of 10 (MSCF). The event lasted for 73 minutes and was due to start-up test for K-7000 and spin of coppus for cool down. A flaring event occurred at GC1 starting at 07/05/2013 00:00 and stopping at 07/06/2013 with a volume of 40 (MSCF). The event lasted for 1440 minutes and was due to flaring during GLT K3300 startup. Flaring stopped when startup complete. A flaring event occurred at GC3 starting at 06/29/2013 19:09 and stopping at 06/29/2013 20:10 with a volume of 551 (MSCF). The event lasted for 61 minutes and was due to LPS compressor s/d due to thermocouple deviations and V4 recycle valve UP failure. Flaring stopped when production was curtailed and compressor re -loaded after repairs complete. A flaring event occurred at FS1 starting at 06/27/2013 20:35 and stopping at 06/27/2013 23:00 with a volume of 604 (MSCF). The event lasted for 145 minutes and was due to unloading of the 1802 STV/IP compressor due to high ambient temps. Flaring stopped when the alternate 1801 compressor was loaded. A flaring event occurred at FS1 starting at 06/28/2013 00:01 and stopping at 06/28/2013 01:26 with a volume of 354 (MSCF). The event lasted for 85 minutes and was due to unloading of the 1801 STV/IP compressor due to high ambient temps. Flaring stopped when the alternate 1802 compressor was loaded.. A flaring event occurred at FS1 starting at 07/01/2013 16:35 and stopping at 07/01/2013 20:20 with a volume of 851 (MSCF). The event lasted for 225 minutes and was due to depressurization of DS12 for planned maintenance. Flaring stopped when depressure complete. A flaring event occurred at FS1 starting at 07/07/2013 09:50 and stopping at 07/07/2013 11:30 with a volume of 851 (MSCF). The event lasted for 100 minutes and was due to depressurization of 12-6 and 12-C commonlines for removal of pig launcher and receiver. A flaring event occurred at FS2 starting at 06/30/2013 00:54 and stopping at 06/30/2013 04:03 with a volume of 929 (MSCF). The event lasted for 189 minutes and was due to depressurization of A -HP, B -HP, MP & A -Treater Flash Drum for A -train turnaround work. Flaring stopped when the HP oil trains were depressured. Please let me know if you have any questions. Kellie Okonek (alt. Travis Rybicki) PCC/EOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (P80C) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akoosocceoctKbbo.com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000031 2. Facility Name PBU GC 1 3. Field PBU - WOA 4. Operator BP 5. Month/Year of Disposition July -2013 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume, 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected U PRUDHOE 640150 99.85% LISBURNE 640144 0.00% 8. Flared or vented 1 hour or less 20 MIDNIGHT SUN 640158 0.15% PT MCINTYRE 640180 0.00% 9. Flared or vented more than 1 hour (see instr.) 200 10. Pilot and Purge 54,974 11, Assist Gas U 12. Fuel gas used in lease operations. 848,119 13. Other (see instructions) 0 Official Use Only Authorization >t hr: Safety � OD MCF 14. TOTAL VOLUME (ITEMS 6-12) 903,313 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MC F 17. Transferred from: 0 n 1 / (Q Commissioner Date 18. Transferred to: (Express as a negative #) CGF -65,542,254 19. Remarks: egoing i true to the best of my knowledge. I hereby certify tGO, Note: All volumes must be corrected SignatureTitle Mana er Production Taxes and o 7ties Alaska to pressure of 14.65 psia and to a // J L temperature of 60o F. Authority 20 7/4/3 Printed Name Diane ColleyPhone (907) 564-5775 Date 0 / 3 AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT July 2013 Page 7 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 7/1/2013 1223-1225 20 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr TOTAL 20 Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 7/5/2013 0000-2400 40 See attachments See attachments TOTAL 40 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 7/18/2013 0800-1600 160 See attachments See attachments TOTAL 160 Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME TOTAL 20 40 0 160 54,974 0 55,194 8/12/2013 2:34 PM Flare StartDate 07/01/2013 Flare End Date 07/31/2013 GC1 Flare Report Total Volume (MSCF) 220 Report Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 13-347 Controlled Blowdown 07/05/2013 12:00:00 am 12:00:00 am 1440 min Yes No No BP7\SPINKAJD 40 Determination Cause Flared during 3300 GLT machine startup. Action Taken Statup completed. 13-354 Controlled Blowdown 07/18/2013 8:00:00 am 4:00:00 pm 480 min No No Yes BP1\81FFERDL 160 Determination Cause Planned swapping out of LP and IP Compresors in gas Skid 19 for PM's Action Taken Planned swaps, done as quirk as possible for techs. to do PM's Total Volume (MSCF) 220 Generated 08/07/2013 11:29:06AM Page 9 of 11 Hunt Jennifer L (DOA) From: AK, OPS PCC EOC TL (AKOPSPCCEOCTL@bp.com] Sent: Sunday, July 07, 2013 6:18 PM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv East; Burgess, David H; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; AK, OPS FS2 OSM; AK, OPS FS2 Facility OTL; AK, HSSEE Env Adv West; AK, OPS GC3&PCC OSM; AK, OPS GC3 Facility & Field OTL; AK, OPS FS1 OSM; AK, OPS FS1 Facility OTL; Kruger, Dale 0 Subject: Gas flaring events at GCI, GC3, FS1, FS2 To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC iennifer.huntk@alaska.00v dave.roby(d )alaska.00v victoria ferouson(aa)alaska.gov From: Kellie Okonek, GPB Production Optimization Team Leader A flaring event occurred at GC1 starting at 06/28/2013 16:30 and stopping at 06/28/2013 18:15 with a volume of 390 (MSCF). The event lasted for 105 minutes and was due to depressurization of spare GLT compressor when EOA Big AL was loaded. Flaring stopped when depressurization was complete. A flaring event occurred at GC1 starting at 06/29/2013 17:57 and stopping at 06/29/2013 19:10 with a volume of 10 (MSCF). The event lasted for 73 minutes and was due to start-up test for K-7000 and spin of coppus for cool down. A flaring event occurred at GC1 starting at 07/05/2013 00:00 and stopping at 07/06/2013 with a volume of 40 (MSCF). The event lasted for 1440 minutes and was due to flaring during GLT K3300 startup. Flaring stopped when startup complete. A flaring event occurred at GC3 starting at 06/29/2013 19:09 and stopping at 06/29/2013 20:10 with a volume of 551 (MSCF). The event lasted for 61 minutes and was due to LPS compressor s/d due to thermocouple deviations and V4 recycle valve I/P failure. Flaring stopped when production was curtailed and compressor re -loaded after repairs complete. A flaring event occurred at FS1 starting at 06/27/2013 20:35 and stopping at 06/27/2013 23:00 with a volume of 604 (MSCF). The event lasted for 145 minutes and was due to unloading of the 1802 STV/IP compressor due to high ambient temps. Flaring stopped when the alternate 1801 compressor was loaded. A flaring event occurred at FS1 starting at 06/28/2013 00:01 and stopping at 06/28/2013 01:26 with a volume of 354 (MSCF). The event lasted for 85 minutes and was due to unloading of the 1801 STV/IP compressor due to high ambient temps. Flaring stopped when the alternate 1802 compressor was loaded.. A flaring event occurred at FS1 starting at 07/01/2013 16:35 and stopping at 07/01/2013 20:20 with a volume of 851 (MSCF). The event lasted for 225 minutes and was due to depressurization of DS12 for planned maintenance. Flaring stopped when depressure complete. A flaring event occurred at FS1 starting at 07/07/2013 09:50 and stopping at 07/07/2013 11:30 with a volume of 851 (MSCF). The event lasted for 100 minutes and was due to depressurization of 12-B and 12-C commonlines for removal of pig launcher and receiver. A flaring event occurred at FS2 starting at 06/30/2013 00:54 and stopping at 06/30/2013 04:03 with a volume of 929 (MSCF). The event lasted for 189 minutes and was due to depressurization of A -HP, B -HP, MP & A -Treater Flash Drum for A -train turnaround work. Flaring stopped when the HP oil trains were depressured. Please let me know if you have any questions. Kellie Okonek (alt. Travis Rybicki) PCCIEOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akopspcceoctl0bp.com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRMI irFn r_ec niconerrinki 1. Facility Number 2. Facility Name 0290000031 PBU GC 1 Disposition 3. Field PBU - WOA Volume MCF . %Pli I O.J . 4. Operator 5. Month/Year of Disposition BP Au ust-2013 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 99.82% LISBURNE 640144 0.00% 8. Flared or vented hour or less 2,550 MIDNIGHT SUN 640158 0.18% PT MCINTVRE 640180 0.00% 9. Flared or vented more than 1 hour (see mstr.) 82,231 10. Pilot and Purge 54701 11, Assist Gas O 12. Fuel gas used in lease operations. 593,655 13. Other (see instructions) 0Official Use Only Authorization >1 hr: Safety 92,7 3 1 / MCF 14. TOTAL VOLUME (ITEMS 6-12) 733,137 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: O � � — Commissioner Date 18. Transferred to: (Express as a negative #) CGF -54,779,207 19. Remarks: hereby certify that A (th�e foregoing is true and correct to the best of my knowledge. C //G1 ' Uq Note: All volumes must be corrected Signature Title Mana er Production Taxes and Ro. aloes Alaska to pressure of 14.65 psis and to a Printed Name Diane Colley I i J temperature of 60o F. Authority 20 Phone (907) 564-5775 Date AAC25.235. VL/— G/3114 Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT -GC -1 GAS FLARING INCIDENT REPORT August 2013 8/4/2013 1810-1812 20 Not required for unplanned events <=1 hr Not required for unplanned events <= 1 hr 8/4/2013 2027-2034 45 8/5/2013 0952-0959 45 8/15/2013 2223-2225 10 8/17/2013 1238-1244 110 8/17/2013 1238-1240 60 8/18/2013 1849-1917 650 8/24/2013 1315-1332 300 8/26/2013 0945-0950 40 8/27/2013 0725-0735 280 8/27/2013 2140-2155 320 VOLUME DESCRIPTION OF INCIDENT&CAUSE TOTAL 1,880 8/6/2013 0111-2359 ----- 165 See attachments n..,,yh,v CWV>L See..vatt..achmcnents C....... 8/9-14/13 0330.2400 70,700 670 8/16-17/2013 0000-2358 750 1,490 8/23/2013 1945-2400 980 54,701 8/24/2013 0024-2052 7,826 139,482 8/26/2013 1105-1635 320 TOTAL 80,741 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE 8/2/2013 TIME 1654-1704 VOLUME DESCRIPTION OF INCIDENT&CAUSE ACTION TAKENTO ELIMINATE CAUSE 20 See attachments See attachments 8/8/2013 0145-0153 70 8/8/2013 0405-0420 280 8/18/2013 0941-0955 300 TOTAL 670 8/8/2013 1050-2400 1,190 See attachments - See attachments 8/11/2013 1930-2035 300 TOTAL 1,490 Page 6 9/12/2013 3:32 PM TOTAL Unplanned Events <1 Hour 1,880 Unplanned Events> 1 Hour 80,741 Planned Events< I hour and not 670 exceeding 5,000 MCF Planned Events > 1 hour or 1,490 exceeding 5,000 MCF Pilot Purge 54,701 Assist 0 TOTAL FLARED VOLUME 139,482 Page 6 9/12/2013 3:32 PM Flare StartDate 08/01/2013 Flare End Date 08/31/2013 GCI Flare Report Total Volume (MSCF) 84781 Report Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 13-381 Other 08/02/2013 4:54:00 pm 5:04:00 pm 10 min No No Yes BPIUONESCC 20 Determination Cause Start-up K-01-7001. Action Taken Sustained fire achieved. 13-392 Flare Relief 08/06/2013 1:11:00 am 11:59:00 pm 1368 min Yes No No BMJONESCC 165 Determination Cause Low oil rate through Annex due to GC -2 Tie -line / J -pad shutdown & low gas to LP compressors resulting in LP gas flaring for 27 minutes. Action Taken Oil rates increased through Annex. 13-394 Flare Relief 08/08/2013 1:45:00 am 1:5300 am 8 min No No Yes BP1\HELMIGBJ 70 Determination Cause Flared from test bank to switch from HP mode to LP mode for well testing. Action Taken Test bank pressure at set point for LP testing. 13-394 Flare Relief 08/08/2013 4:05:00 am 4:20:00 am 15 min No No Yes MP HELMIGBJ 280 Determination Cause Depressumd GLT 3200 to the flare for maintenance repairs. Action Taken Depressuring complete. 13-394 Flare Relief 08/08/2013 10:50:00 am 12:00:00 am 790 min No No Yes BP1\HELMIGBJ 1190 Determination Cause Depressured GLT header through B slugcatcher for maintenance Action Taken Job complete. 13-399 Flare Relief 08/09/2013 3:30:00 am 12:00:00 am 1230 min No No No BP1\HELMIGBJ 10700 Determination Cause Annex shutdown at 0330 for SSR. Flared off V-136 due to lack of IP gas. Action Taken Will continue while the Annex is down. 13-400 Flare Relief 08/10/2013 12:00:00 am 12:00:00 am 1440 min No No No BP7\HELMIGBJ 12000 Determination Cause Flared off V-136 due to low gas rates while the Annex is down. Action Taken Annex to remain down for SSR cutover. 13-402 Flare Relief 08/11/2013 12:00:00 am 12:00:00 am 1440 min No No No BPI\HELMIGBJ 12000 Determination Cause Flared off V-136 due to low gas rates while the Annex is down. Action Taken Annex remains down for SSR cutover. Generated 09/04/2013 10:13:15AM Page 7 of 12 Flare Start Date 08/01/2013 Flare End Date 08/31/2013 13402 Flare Relief 08/11/2013 7:30:00 pm 8:35:00 pm 65 min No No Yes BP1\HELMIGBJ 300 Determination Cause Depressured C slugcatcher for maintenance. Action Taken Depressuring complete. Flare valve closed. 13-404 Flare Relief 08/12/2013 12:00:00 am 12:00:00 am 1440 min No No No BPI\HELMIGBJ 12000 Determination Cause Flared off V-136 due to low gas rates while the Annex is down. Action Taken Annex remains dawn for SSR cutover work. 13-409 Flare Relief 08/13/2013 120000am 120000am 1440min No No No BP1\HELMIGBJ 12000 Determination Cause Flared off V-136 due to low gas rates while the Annex is down. Action Taken Annex is still down. 13-110 Flare Relief 08/14/2013 12:00:00 am 12:00:00 am 1440 min No No No BPI\SPRINGG 12000 Determination Cause Flared off V-136 due to IoW gas rates while the Annex is down. Action Taken Annex is still down. 13-417 Flare Relief 08/16/2013 12:00:00 am 1200:00 am 1440 min Yes Determination Cause V-136 flaring due to swinging oil rates Action Taken waiting for stable oil rates 13-415 Flare Relief 08/17/2013 12:00:00 am 11:58:00 pm 1438 min Yes Determination Cause V-136 flaring due to swinging oil rates Action Taken waiting for stable oil rates No No BP1\SPRINGG 500 No 13-419 Flare Relief 06/18/2013 9:41:00 am 9:55:00 am 14 min No No Yes BP1\8IFFERDL 300 Determination Cause Flared when eleckican had to installed breaker on AHOA-01,0075 after working on it knocked down the LP and IP Compresors in gas plant Action Taken Started Compressors back up as soon as breaker was installed. 13-431 Flare Relief 08/23/2013 7:45:00 pm 12:00:00 am 255 min Yes No No BP1\SPRINGG 980 Generated 09/04/2013 10:13:15AM Page 8 of 12 Flare Start Date 08/01/2013 Flare End Date 08131/2013 Determination Cause Flaring due to GT1-3 line lift Action Taken flaring continuing 13-434 Flare Relief 08/24/2013 12:24:00 am 8:52:00 pm 1228 min Yes No No BP1\SPRINGG 7826 Determination Cause Flaring due to GTI -3 line lift 3n1 stage flare #3 open Action Taken flaring continued 13-439 Flare Relief 08/26/2013 11:05:00 am 4:35:00 pm 330 min No No No BP1\SPRINGG 320 Determination Cause Swapping GLT machines for 1-12owashes Action Taken H2o washes complete Total Volume (MSCF) 84781 Generated 09/04/2013 10:13:16AM Page 9 of 12 Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Sunday, August 18, 2013 3:41 PM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; AK, HSSEE Env Adv West Subject: Gas flaring events at GC1 To: Jennifer Hunt, AOGCC ie n niter. h unt(cilalaska. aov CC: Dave Roby, AOGCC dave.roby a.alaska.aov From: Travis Rybicki, GPB Production Optimization Team Leader CC: Victoria Ferguson, AOGCC victoria.ferg usonoalaska.gov A flaring event occurred at GCI starting at 08/06/2013 01:11 and stopping at 08/06/2013 23:59 with a volume of 165 (MSCF). The intermittent event lasted for 1368 minutes. Flaring was due low rates at GC1 in the Annex during GC2 plant outage resulting in intermittent flaring from the LP and IP systems. Flaring ended as rates were increased in the Annex allowing the LP/IP systems to remain loaded. A flaring event occurred at GC1 starting at 08/08/2013 10:50 and stopping at 08/08/2013 24:00 with a volume of 1190 (MSCF). The event lasted for 790 minutes. Flaring was due to flaring during the planned depressuring of the WOA GLT supply line for planned inspection work. Flaring continued while the GLT line was depressured via B Slugcatcher. Flaring ended when the GLT line was depressured to required state and flare valves closed. A flaring event occurred at GC1 starting at 08/09/2013 03:30 and stopping at 08/09/2013 24:00 with a volume of 10700 (MSCF). The event lasted for 1230 minutes. Flaring was due to the planned shutdown of the GC1 Annex system for SSR project work. Flaring from the LP and IP systems occurred intermittently due to low total oil throughput at GC1 with the Annex down. Flaring continued into the following day. A flaring event occurred at GC1 starting at 08/10/2013 00:00 and stopping at 08/10/2013 24:00 with a volume of 12000 (MSCF). The event lasted for 1440 minutes. Flaring was due to the planned shutdown of the GC1 Annex system for SSR project work. Flaring from the LP and IP systems occurred intermittently due to low total oil throughput at GC1 with the Annex down. Flaring continued into the following day. A flaring event occurred at GC1 starting at 08/11/2013 00:00 and stopping at 08/11/2013 24:00 with a volume of 12000 (MSCF). The event lasted for 1440 minutes. Flaring was due to the planned shutdown of the GCI Annex system for SSR project work. Flaring from the LP and IP systems occurred intermittently due to low total oil throughput at GC1 with the Annex down. Flaring continued into the following day. A flaring event occurred at GC1 starting at 08/11/2013 19:30 and stopping at 08/11/2013 20:35 with a volume of 300 (MSCF). The event lasted for 65 minutes. Flaring was due to the planned shutdown of the C Slugcatcher for planned maintenance. Flaring continued while the C Slugcatcher was depressured for the planned work. Flaring ended when the C Slugcatcher was depressured and the flare valves closed. A flaring event occurred at GC1 starting at 08/12/2013 00:00 and stopping at 08/12/2013 24:00 with a volume of 12000 (MSCF). The event lasted for 1440 minutes. Flaring was due to the planned shutdown of the GC1 Annex system for SSR project work. Flaring from the LP and IP systems occurred intermittently due to low total oil throughput at GC1 with the Annex down. Flaring continued into the following day. A flaring event occurred at GC1 starting at 08/13/2013 00:00 and stopping at 08/13/2013 24:00 with a volume of 12000 (MSCF). The event lasted for 1440 minutes. Flaring was due to the planned shutdown of the GC1 Annex system for SSR project work. Flaring from the LP and IP systems occurred intermittently due to low total oil throughput at GC1 with the Annex down. Flaring continued into the following day. A flaring event occurred at GC1 starting at 08/14/2013 00:00 and stopping at 08/14/2013 24:00 with a volume of 12000 (MSCF). The event lasted for 1440 minutes. Flaring was due to the planned shutdown of the GC1 Annex system for SSR project work. Flaring from the LP and IP systems occurred intermittently due to low total oil throughput at GC1 with the Annex down. Flaring ended when the GC1 Annex was brought back online, rate increased and the flare valves closed. A flaring event occurred at GCI starting at 08/16/2013 00:00 and stopping at 08/16/2013 24:00 with a volume of 500 (MSCF). The intermittent event lasted for 1440 minutes. Flaring was due low rates at GC1 due to swinging production rates resulting in intermittent flaring from the LP and IP systems. Flaring continued into the following day. A flaring event occurred at GC1 starting at 08/17/2013 00:00 and stopping at 08/17/2013 23:58 with a volume of 250 (MSCF). The intermittent event lasted for 1438 minutes. Flaring was due low rates at GCI due to swinging production rates resulting in intermittent flaring from the LP and IP systems. Flaring ended as rates were increased in the Annex allowing the LP/IP systems to remain loaded. Please let me know if you have any questions Travis M. Rybicki PCC-EOC (Production Optimization) Team Lead Office 907-659-4472 (BOC) 659-5566 (PBOC) Cell 907-748-2118 Harmony 758-4404 GPB Pager 907-659-5272 # 1890 akops pcceoctl (7 b O. co m Alternate: Kellie Okonek Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj Sent: Sunday, August 25, 2013 11:06 PM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, OPS GCI Facility OTL; AK, OPS GC1 OSM; AK, HSSEE Env Adv West; AK, OPS GC2 Facility OTL; AK, OPS GC2 OSM; AK, OPS GC3 Facility & Field OTL; AK, OPS GC3&PCC OSM; AK, OPS FS3 OSM; AK, OPS FS3 Facility OTL; Burgess, David H; AK, HSSEE Env Adv East Subject: Gas flaring events at GCI, GC2, GC3, FS3 To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC 1ennifer.hunt6dalaska.gov dave.robv(a)alaska.gov victoria.ferguson(g)alaska.gov From: Kellie Okonek, GPB Production Optimization Team Leader A flaring event occurred at GC2 starting at 08/25/2013 00:00 and stopping at 08/25/2013 13:00 with a volume of 7583 (MSCF). The event lasted for 780 minutes. The event had a volume greater than 5000 (MSCF) and was due to flaring off the LPS compressors as the transit system pressure came up during startup of gas lifted rate. A flaring event occurred at GC2 starting at 08/24/2013 13:24 and stopping at 08/25/2013 with a volume of 6448 (MSCF). The event lasted for 636 minutes. The event had a volume greater than 5000 (MSCF) and was due to flaring off the IP/LP compressors for operational stability as GILT was ramping back up. A flaring event occurred at GC1 starting at 08/24/2013 00:24 and stopping at 08/24/2013 20:52 with a volume of 7826 (MSCF). The event lasted for 1228 minutes. The event had a volume greater than 5000 (MSCF) and was due to final depressurization of the GT -13 for planned inspections. A flaring event occurred at GC1 starting at 08/23/2013 19:45 and stopping at 08/24/2013 with a volume of 980 (MSCF). The event lasted for 255 minutes and was due to depressurization of the GT -13 line for planned inspections. A flaring event occurred at GC3 starting at 08/24/2013 00:00 and stopping at 08/24/2013 15:30 with a volume of 2000 (MSCF). The event lasted for 930 minutes and was due to depressurization of GT -13 for planned inspections. Flaring stopped when pressure reduced to below 250 psig. A flaring event occurred at FS3 starting at 08/20/2013 13:00 and stopping at 08/20/2013 14:22 with a volume of 342 (MSCF). The event lasted for 82 minutes and was due to STV/IP compressor 1801 having operational issues. Flaring stopped when operations switched to 1802. Please let me know if you have any questions. Kellie Okonek (alt. Travis Rybicki) PCC/EOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akogsocceoctiabp.com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT (IF PPr)ni lrcn rnnc Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE 0/3/1 Submit in Duplicate 9/8/2013 9/10/2013 9/13/2013 9/14/2013 9/15/2013 9/19/2013 9/20/2013 9/23/2013 9/28/2013 9/2/2013 9/6/2013 9/7/2013 9/5/2013 9/5/2013 9/16/2013 9/18/2013 1302-1306 0600-0610 0722-0729 1028-1031 1424-1426 1600-1612 2245-2250 0410-0417 1449-1506 TOTAL 1502-2359 1330-1650 1500-2300 TOTAL 1307-1315 1551-1600 TOTAL 0300-2230 0220-1500 TOTAL Unplanned Events <1 Hour Unplanned Events> 1 Hour Planned Events <1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT September 2013 30 Not required for unplanned events <= 1 hr 240 120 150 40 60 20 290 320 1,270 560 See attachments 160 240 960 110 See attachments 240 350 6,070 See attachments 220 6,290 TOTAL 1,270 960 350 6,290 53,968 0 62,838 Not required for unplanned events <= 1 hr See attachments See attachments See attachments Page 7 10/11/2013 8:58 AM Flare StartDate 09/01/2013 Flare End Date 09/30/2013 GCI Flare Report Total Volume (MSCF) 8670 Report Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 13-442 Flare Relief 09/02/2013 3:02:00 pm 11:59:00 pm 537 min Yes No No BP1\MAT rRR 560 Determination Cause Flaring off of the IP compressor due to low IP gas rates from "D" bank. Action Taken Supplying more IP and LP gas rates from other banks. 13-444 Flare Relief 09/05/2013 1:07:00 on 1:15:00 pm 8 min No No Yes BPI\MATTRR 110 Determination Cause Flaring off the starter motor for K-3300 start-up. Action Taken Flaring stopped when K-3300 was started. 13-444 Flare Relief 09/05/2013 3:51:00 pm 4:00:00 pm 9 min No No Yes BP1\MATTRR 240 Determination Cause Flaring to depressurize K-3200 after it was shut down. Action Taken Flaring stopped when K-3200 was depressured. 13-447 Flare Relief 09/06/2013 1:30:00 pm 4:50:00 pm 200 min Yes No No BPITISHERCD 160 Determination Cause Extended Baring event occurred while awaiting GC operator/maintenance evaluation. Flaring from V-136 due to inadequate amount of IP gas to load compressor K-108 Action Taken No response taken as this was deemed to be of short duration. Piping repairs in Sk-525 ongoing in order load IP gas system 13A48 Flare Relief 09/07/2013 3:00:00 pm 11:00:00 pm 480 min Yes No No BPITUELMO 240 Determination Cause Flaring intermittently off of V-136 because our Annex to "D" bank 2nd stage being out of service do to leak. Action Taken Get Annex to "D" 2nd stage back in service. 13-465 Flare Relief 09/16/2013 3:00:00 am 10:30:00 pm 1170 min No No Yes BP7\HELMIGBJ 6070 Generated 10/02/2013 9:20:43AM Page 7 of 10 Flare Start Date 09/01/2013 Flare End Date 09/302013 Determination Cause Flared off V-136 and GT -13 to aid in depressudng GT -13 for line lift. Action Taken Work completed and K-108 back in service. 13-472 Flare Relief 09/182013 2:20:00 am 3:00:00 pm 760 min No No Determination Cause Schedualed water wash on LPS Compresor K7001 Action Taken Finished planned water wash on K7001 Yes BP10FFERDL 220 Total Volume (MSCF) 8870 Generated 10/022013 9:20:43AM Page 8 of 10 Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Sunday, September 01, 2013 2:31 PM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; AK, HSSEE Env Adv West; AK, OPS FS3 OSM; AK, OPS FS3 Facility OTL; Burgess, David H; AK, HSSEE Env Adv East; AK, OPS FS2 Facility OTL; AK, OPS FS2 OSM Subject: Gas flaring events aWFS2, FS3 To: Jennifer Hunt, AOGCC iennifer.huntla alaskgM CC: Dave Roby, AOGCC dave. robv(ccilalaska. qov From: Kellie Okonek, GPB Production Optimization Team Leader CC: Victoria Ferguson, AOGCC victoria.fergusona-alaska qov A flaring event occurred at FS2 starting at 08/31/2013 15:31 and stopping at 08/31/2013 17:50 with a volume of 18 (MSCF). The event lasted for 139 minutes and was due to depressurization of 16D commonline for planned removal of temporary pigging facilities. Flaring stopped when depressurization complete. A flaring event occurred at GC1 starting at 08/26/2013 11:05 and stopping at 08/26/2013 16:35 with a volume of 320 (MSCF). The event lasted for 330 minutes and was due to swapping of GLT machines for water washes. Flaring stopped when water washes complete. A flaring event occurred at FS3 starting at 08/26/2013 14:50 and stopping at 08/26/2013 15:45 with a volume of 9329 (MSCF). The event was a black smoke event. The event had a volume greater than 5000 (MSCF) and was due to a power outage that caused loss of T/C's 1801, 1803, & 1806 in addition to the water section, regens shipping pump, etc. Flaring stopped when the turbine/compressors were started and re -loaded after getting generator power established. Please let me know if you have any questions. Kellie Okonek (alt. Travis Rybicki) PCC/EOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akopspcceoctI(gDbp.com Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Tuesday, September 17, 2013 9:31 AM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; AK, HSSEE Env Adv West Subject: Gas flaring events atm To: Jennifer Hunt, AOGCC 4ennifer. h unt(aalaska.gov CC: Dave Roby, AOGCC dave. robv(acl�.alaska.gov From: Travis Rybicki, GPB Production Optimization Team Leader CC: Victoria Ferguson, AOGCC victoria.ferouson(a)alaska oov A flaring event occurred at GC1 starting at 09/02/2013 15:02 and stopping at 09/02/2013 24:00 with a volume of 560 (MSCF). The intermittent event lasted for 538 minutes and was due to flaring off the IP Compressor due to low oil rates. Flaring stopped when sufficient load was available for the IP Compressor. A flaring event occurred at GC1 starting at 09/06/2013 13:30 and stopping at 09/06/2013 16:50 with a volume of 160 (MSCF). The intermittent event lasted for 200 minutes and was due to flaring off the IP Compressor due to low oil rates associated with D Bank 2 n Stage vessel unavailability. Flaring stopped when sufficient load was available for the IP Compressor. A flaring event occurred at GCI starting at 09/07/2013 15:00 and stopping at 09/07/2013 23:00 with a volume of 240 (MSCF). The intermittent event lasted for 480 minutes and was due to flaring off the IP Compressor due to low oil rates associated with D Bank 2 n Stage vessel unavailability. Flaring stopped when sufficient load was available for the IP Compressor. Please let me know if you have any questions. Travis M. Rybicki PCC-EOC (Production Optimization) Team Lead Office 907-659-4472 (BOC) 659-5566 (PBOC) Cell 907-748-2118 Harmony 758-4404 GPB Pager 907-659-5272 * 1890 akoosocceoctl(a)bp.com Alternate: Kellie Okonek Kellie Okonek (alt. Travis Rybicki) PCC/EOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akoospcceoctl(abp.com Hunt, Jennifer L (DOA From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Wednesday, September 25, 2013 10:49 PM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, OPS GCI Facility OTL; AK, OPS GC1 OSM; AK, HSSEE Env Adv West; AK, OPS GC3 Facility & Field OTL; AK, OPS GC3&PCC OSM; AK, OPS FS3 OSM; AK, OPS FS3 Facility OTL; Burgess, David H; AK, HSSEE Env Adv East; AK, OPS PCC EOC TL; AK OPS FS2 OSM; AK, OPS FS2 Facility OTL Subject: Gas flaring events at*M, GC3, FS2, FS3 To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC iennifer.hunt( alaska.00v dave.robvaalaska oov victoria.ferousona-alaska oov From: Kellie Okonek, GPB Production Optimization Team Leader A flaring event occurred at FS2 starting at 09/24/2013 01:00 and stopping at 09/24/2013 03:00 with a volume of 214 (MSCF). The event lasted for 120 minutes, and was due to depressurization of 9A commonline for repairs. Flaring stopped when line depressured. A flaring event occurred at FS2 starting at 09/23/2013 20:30 and stopping at 09/23/2013 23:30 with a volume of 479 (MSCF). The event lasted for 180 minutes, and was due to DS9E commonline coming down to swap blinds. A flaring event occurred at FS3 starting at 09/22/2013 14:20 and stopping at 09/22/2013 15:40 with a volume of 60 (MSCF). The event lasted for 80 minutes, and was due to depressurization of 6D commonline to install a pig launcher. Flaring stopped when line depressured. A flaring event occurred at GC1 starting at 09/18/2013 02:20 and stopping at 09/18/2013 15:00 with a volume of 220 (MSCF). The event lasted for 760 minutes, and was due to scheduled water wash on K7001. A flaring event occurred at GC3 starting at 09/18/2013 00:01 and stopping at 09/18/2013 02:00 with a volume of 413 (MSCF). The event lasted for 119 minutes, and was due to wet gas compressor shutdown due to control/instrumentation failure. Flaring stopped when WOA production was decreased. A flaring event occurred at GC3 starting at 09/17/2013 20:02 and stopping at 09/18/2013 with a volume of 826 (MSCF). The event lasted for 238 minutes, and was due to wet gas compressor shutdown due to control/instrumentation failure. Flaring stopped when WOA production was decreased. A flaring event occurred at FS3 starting at 09/17/2013 14:14 and stopping at 09/17/2013 15:51 with a volume of 74 (MSCF). The event lasted for 97 minutes, and was due to depressurization of 6B for the make-piggable project. A flaring event occurred at GC1 starting at 09/16/2013 03:00 and stopping at 09/16/2013 22:30 with a volume of 6070 (MSCF). The event lasted for 1170 minutes. The event had a volume greater than 5000 (MSCF) and was due to depressurization of GT -13 in support of line lifts for inspection. Please let me know if you have any questions. Kellie Okonek (alt. Travis Rybicki) PCC/EOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akopspcceoct[CWbp.com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY RFPC)RT nG OOnnl li+rr% ^ A [. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE ✓L /. , ,�-/31d`- Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT October 2013 = Il t VOLUME DESCRIPTION OF INCIDENT &-CAUSE 10/16/2013 1353-1359 40 Not required for unplanned events <= 1 hr TOTAL 40 10/4-8/2013 2051-2400 41,290 See attachments 10/9/2013 2204-2400 40 10/18-19/2013 1800-1430 3,025 10/23/2013 1015-1515 67,000 exceeding 5,000 MCF TOTAL 111,355 anned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF IN( 10/10/2013 0928-0931 60 See attachments 10/15/2013 0730-0757 370 10/15/2013 1215-1219 270 10/25/2013 1221-1225 140 TOTAL 840 See attachments TOTAL 0 Not required for unplanned events <= 1 hr See attachments See attachments See attachments Page 1 11/15/2013 10:49 AM TOTAL Unplanned Events < 1 Hour 40 Unplanned Events> 1 Hour 111,355 Planned Events < 1 hour and not 840 exceeding 5,000 MCF Planned Events> 1 hour or 0 exceeding 5,000 MCF Pilot Purge 55,340 Assist 0 TOTAL FLARED VOLUME 167,575 Not required for unplanned events <= 1 hr See attachments See attachments See attachments Page 1 11/15/2013 10:49 AM Flare Start Date 10/01/2013 Flare End Date 10/31/2013 GCI Flare Report Total Volume (MSCF) 112235 Report Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 13-510 Flare Relief 10/04/2013 8:51:00 pm 12:00:00 am 189 min Yes No No BPI\FUELMO 1290 Determination Cause Flaring off of V-136 due to taking the Annex down for SSR work and reduced oil flow though facility. Action Taken Flaring will stop when Annex is back in service. Daily Volume (MSCF) 1290 13-514 Flare Relief 10/05/2013 12:00:00 am 12:00:00 am 1440 min No No No BPt\FUELMO 10000 Determination Cause Flaring off of V-136 due to taking the Annex down for SSR work and reduced oil flow though facility. Action Taken flaring will stop when annex is back up. Daily Volume (MSCF) 10000 13-515 Flare Relief 10/06/2013 12:00:00 am 12:00:00 am 1440 min No No No BP1\FUELMO 10000 Determination Cause Flaring off of V-136 due to taking the Annex down for SSR work and reduced oil flow though facility. Action Taken flaring will stop when annex is back up. Daily Volume (MSCF) 10000 13-518 Flare Relief 10/07/2013 12:00:00 am 12:00:00 am 1440 min No No No 8P1\FUELMO 10000 Determination Cause Flaring off of V-136 due to taking the Annex down for SSR work and reduced oil flow though facility. Action Taken Flaring will stop when annex is put back in service. Aprox. 1 day. Daily Volume (MSCF) 10000 13-520 Flare Relief 10/08/2013 12:00:00 am 12:00:00 am 1440 min Yes No No BP1\FUELMO 10000 Determination Cause Flaring off of V-136 due to taking the Annex down for SSR work and reduced oil flow though facility. Action Taken Flaring will stop when Annex is back up. Daily Volume (MSCF) 10000 13-526 Flare Relief 10/09/2013 10:04:00 pm 12:00:00 am 116 min Yes No No BP1\SPRINGG 40 Determination Cause low oil rate Action Taken waiting for rate increase Daily Volume (MSCF) 40 13-525 Flare Relief 10/10/2013 9:28:00 am 9:31:00 am 3 min No No Yes BP1\BIFFERDL 60 Determination Cause Depresured test separator to put in Low Presure Mode. Action Taken Shut flare valve when presure was low enough to open into Low Presure system. Daily Volume (MSCF) 60 13-532 Flare Relief 10/15/2013 7:30:00 am 7:57:00 am 27 min No No Yes BPI\BIFFERDL 370 Determination Cause Flaring FA2/43/44 down to 50OPSI to test separator for line lifts. Action Taken Stopped flaring when lines were deppresured far enough to do line lifts. 13-532 Flare Relief 10/15/2013 12:15:00 pm 12:19:00 pm 4 min No No Yes BP1\BIFFERDL 270 Determination Cause Took GLT 3300 down and depresured. Action Taken Planned shut down and depmure, closed flare when done. Daily Volume (MSCF) 640 13-536 Flare Relief 10/18/2013 6:00:00 pm 12:00:00 am 360 min Yes No No BP1\SPRINGG 3 Generated 11/04/2013 3:38:24PM Page 10 of 13 Flare Start Date 10/01/2013 Flare End Date 10/31/2013 Determination Cause low oil rate Action Taken compressors -waiting for more rate Daily Volume (MSCF) 3 13-539 Flare Relief 10/19/2013 12:00:00 am 2:30:00 pm 870 min Yes No No BPI\SPRINGG 3022 Determination Cause Low GC1 oil rete. Action Taken Waited for oil rate increase 13-543 Flare Relief 10/23/2013 10:15:00 am 3:15:00 pm 300 min No Yes Determination Cause Power failure shut down LPS compressors after the bam doors would not work on them Action Taken Power re supplied and LPS machines back in service. 13-547 Flare Relief 10/25/2013 12:21:00 pm 12:25:00 pm 4 min No No Determination Cause Flared off 1st stage test bank to run in LP mode. Action Taken Test bank 1st stage at operating pressure. Daily Volume (MSCF) 3022 No BP1\FUELMO 67000 Daily Volume (MSCF) 67000 Yes BPI\HELMIGBJ 140 Daily Volume (MSCF) 140 Total Volume (MSCF) 112235 Generated 11/04/2013 3:38:24PM Page 11 of 13 Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Tuesday, October 15, 2013 10:32 AM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; AK, HSSEE Env Adv West Subject: Gas flaring events a To: Jennifer Hunt, AOGCC iennifer. h unt(aa)alaska. gov CC: Dave Roby, AOGCC dave. robv(aalaska. gov From: Travis Rybicki, GPB Production Optimization Team Leader CC: Victoria Ferguson, AOGCC victoria. fergusonaalaska.gov A flaring event occurred at GC1 starting at 10/04/2013 20:51 and stopping at 10/04/2013 24:00 with a volume of 1290 (MSCF). The intermittent event lasted for 189 minutes and was due to flaring off the V-136 IP vessel due to low oil rates associated with the planned shutdown of the GC1 Annex for ongoing Safety System Renewal (SSR) work. Flaring continued into the following day. A flaring event occurred at GC1 starting at 10/05/2013 00:00 and stopping at 10/05/2013 24:00 with a volume of 10000 (MSCF). The event lasted for 1440 minutes and was due to flaring off the V-136 IF vessel due to low oil rates associated with the planned shutdown of the GC1 Annex for ongoing Safety System Renewal (SSR) work. Flaring continued into the following day. A flaring event occurred at GC1 starting at 10/06/2013 00:00 and stopping at 10/06/2013 24:00 with a volume of 10000 (MSCF). The event lasted for 1440 minutes and was due to flaring off the V-136 IP vessel due to low oil rates associated with the planned shutdown of the GC1 Annex for ongoing Safety System Renewal (SSR) work. Flaring continued into the following day. A flaring event occurred at GC1 starting at 10/07/2013 00:00 and stopping at 10/07/2013 24:00 with a volume of 10000 (MSCF). The event lasted for 1440 minutes and was due to flaring off the V-136 IP vessel due to low oil rates associated with the planned shutdown of the GC1 Annex for ongoing Safety System Renewal (SSR) work. Flaring continued into the following day. A flaring event occurred at GC1 starting at 10/08/2013 00:00 and stopping at 10/08/2013 24:00 with a volume of 10000 (MSCF). The event lasted for 1440 minutes and was due to flaring off the V-136 IP vessel due to low oil rates associated with the planned shutdown of the GC1 Annex for ongoing Safety System Renewal (SSR) work. Flaring continued into the following day. A Flaring event occurred at GC1 starting at 10/09/2013 22:04 and stopping at 10/09/2013 24:00 with a volume of 40 (MSCF). The intermittent event lasted for 116 minutes and was due to flaring off the V-136 IP vessel due to low oil rates in the plant. Flaring continued into the following day. Please let me know if you have any questions. Travis M. Rybicki PCC-EOC (Production Optimization) Team Lead Office 907-659-4472 (BOC) 659-5566 (PBOC) Cell 907-748-2118 Harmony 758-4404 GPB Pager 907-659-5272 * 1890 akopspcceoctl (0b b p. co m Alternate: Kellie Okonek Kellie Okonek (alt. Travis Rybicki) PCC/EOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akopspcceoctl(c bl).com Hunt, Jennifer L (DOA From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Saturday, October 26, 2013 6:20 PM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS PCC EOC TL; AK, OPS CGF OTL; AK, OPS CCP CGF OSM; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; Kruger, Dale O; O'Riordan, Colm J; Burgess, David H; AK, OPS FS2 OSM; AK, OPS FS2 Facility OTL; AKHSSEEEnvAdvWest@bp.com; AK, HSSEE Env Adv East; AK, HSSEE Env Adv Central Subject: Gas flaring events at CG FS2 To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC jenn ifer. hunt(3alaska.gov dave. robVaalaska.gov victoria. ferq u son (c.a laska. aov From: Kellie Okonek, GPB Production Optimization Team Leader A flaring event occurred at FS2 starting at 10/25/2013 00:45 and stopping at 10/25/2013 02:05 with a volume of 410 (MSCF). The event lasted for 80 minutes and was due to shutdown both 1801, 1803, 1804 and depressurization of A HP, B HP and B S/C to remove blind from C S/C. Flaring stopped when depressurization for their plant shutdown was complete. A flaring event occurred at FS2 starting at 10/25/2013 10:30 and stopping at 10/25/2013 10:50 with a volume of 720228 (MSCF). The event had a volume greater than 5000 (MSCF) and was due to extended flaring event occurred while to support planned acoustic testing of FV -1506. A flaring event occurred at CGF starting at 10/23/2013 10:21 and stopping at 10/23/2013 14:25 with a volume of 34024 (MSCF). The event lasted for 244 minutes. The event had a volume greater than 5000 (MSCF) and was due to T/C 1855 Shutdown BESD on Low Seal Oil DP. Flaring stopped when offline 1805 T/C was started. A flaring event occurred at GCI starting at 10/23/2013 10:15 and stopping at 10/23/2013 15:15 with a volume of 67000 (MSCF). The event was a black smoke event. The event lasted for 300 minutes. The event had a volume greater than 5000 (MSCF). Approximately 1/3 of the GC1 facility (LPS, WSW, & PWX) lost all power simultaneously. The loss of power resulted in the gas compressor cooling fans (gas/utility water), and instrument air going down. Soon after this occurred the LIPS and GILT compressors were shutdown in a controlled fashion by the board operator. The loss of these compressors resulted in a flaring event. A flaring event occurred at GC1 starting at 10/19/2013 00:00 and stopping at 10/19/2013 14:30 with a volume of 3022 (MSCF). The event lasted for 870 minutes and was due to. A flaring event occurred at GCI starting at 10/18/2013 18:00 and stopping at 10/19/2013 with a volume of 3 (MSCF). The event lasted for 360 minutes and was due to lowering of rates on the LP/IP compressor KO to prevent black smoke. Please let me know if you have any questions. Kellie Okonek (alt. Travis Rybicki) PCC/EOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akoosocceoctl anbp corn STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODIICFn [;o-qnicpnQ1TinKi 1. Facility Number 2. Facility Name 0290000031 PBU GC 1 Disposition 3. Field PBU - WOA Volume MCF 4. Operator 5, Month/Year of Disposition BP I November -2013 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold G Pool Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 99.83% LISBURNE640144 0.00% 8. Flared or vented l hour or less 800 MIDNIGHT SUN 640158 017% PT MCINTYRE 640180 0.00% 9. Flared or vented more than 1 hour (see instr.) 111,914 10. Pilot and Purge 53,971 11. Assist Gas G 12. Fuel gas used in lease operations. 767,545 13. Other (see instructions) Official Use Only Authorization >1 hr: Safety934,230 7 MCF 14. TOTAL VOLUME (ITEMS 6-12) Lease Use MCF 15. NGL Gas Equivalent U Conservation MCF 16. Purchased gas G Waste: MCF 17. Transferred from: 0 Commissioner Date 18. Transferred to: (Express as a negative #) CGF -69,223,784 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. =(Who Note: All volumes must corrected Signature Title Mana er Production Taxes and Ro a ties Alaska to pressure of 14.65 psisia and to a Printed Name Diane Colleytemperature of 60o F. Authority 20 Phone (907) 564-5775 Date AAC25.235. vz�F 6 /3// 4J - Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate 11/6/2013 1607-1636 11/26/2013 0330-0415 TOTAL BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT November 2013 250 Not required for unplanned events <=1 hr 340 590 Not required for unplanned events <= 1 hr 11/4/2013 0735-0836 1,020 See attachments See attachments 11/20/2013 1143-1856 1,856 TOTAL 2,876 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 11/7/2013 1430-1431 10 See attachments See attachments 11/7/2013 1543-1546 200 TOTAL 210 Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT& CAUSE ACTION TAKEN TO ELIMINATE CAUSE 11/10-18/13 0730-1200 106,438 See attachments See attachments 11/19/2013 0000-2400 2,600 TOTAL 109,038 TOTAL Unplanned Events < 1 Hour 590 Unplanned Events> 1 Hour 2,876 Planned Events < 1 hour and not 210 exceeding 5,000 MCF Planned Events> 1 hour or 109,038 exceeding 5,000 MCF Pilot Purge 53,971 Assist 0 TOTAL FLARED VOLUME 166,685 Page 6 12/10/2013 2:51 PM Flare Start Date 11/01/2013 Flare End Date 11/30/2013 GC1 Flare Report Total Volume (MSCF) 112774 Repoli Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 13-556 Flare Relief 11/04/2013 7:35:00 am 8:36:00 am 61 min Yes No No BP1\FUELM0 1020 Determination Cause Modified stop production caused while instrument techs where trouble shooting old beta panel alarm. Action Taken Fount problem and brought production back into plant.. 13-558 Other 11/07/2013 2:30:00 pm Determination Cause Start GTRB-51-3204, Action Taken Sustained fire achieved. 13-558 Controlled Slowdown 11/07/2013 3:43:00 pm Determination Cause Depmssure K-51-3320. Action Taken Case pressure <5 psig. 2:31:OOpm 1 min No No Yes BPIUONESCC 10 3:46:00 pm 3 min No No Yes BPIWONESCC 200 13-562 Flare Relief 11/10/2013 7:30:00 am 12:00:00 am 990 min No No Yes BPIISPRINGG 8938 Determination Cause D -bank taken offline for SSR Project Cutover. Although oil rate is ower 60,000 bpd, the LP/IP gas compression system is not designed for today's gas conditions when only banks A, B & C are online without D -bank. Action Taken flV-1r 13P flarree setpoint intentionally lowered to minimize the volume flared by preventing LP flaring that requires the addition of assist gas to 13-563 Flare Relief 11/11/2013 12:00:00 am 12:00:00 am 1440 min Yes No Yes BPIISPRINGG 13000 Determination Cause D -bank taken offline for SSR Project Cutover. Although oil rate is over 60,000 bpd, the LP/IP gas compression system is not designed for today's gas conditions when only banks A, B & C are online without D -bank. Action Taken V-136 flare setpoint intentionally lowered to minimize the volume flared by preventing LP flaring that requires the addition of assist gas to _.--erevent hladesmMre 13-564 Flare Relief 11/12/2013 12:00:00 am 12:00:00 am 1440 min Yes No Yes BPIISPRINGG 13000 Determination Cause D -bank taken offline for SSR Project Cutover. Although oil rate is over 60,000 bpd, the LP/IP gas compression system is not designed for today's gas conditions when only banks A, B & C are online without D -bank. Action Taken V-136 flare setpoint intentionally lowered to minimize the volume flared by preventing LP flaring that requires the addition of assist gas to _—oreventMack� 13-565 Flare Relief 11/13/2013 12:00:00 am 12:00:00 am 1440 min No No Yes BPIIKIRSCHW 13000 Determination Cause D -bank taken offline for SSR Project Cutover. Although oil rate is over 60,000 bpd, the LP/IP gas compression system is not designed for today's gas conditions when only banks A, B & C are online without D -bank. Action Taken V-136 flare setpoint intentionally lowered to minimize the volume flared by preventing LP flaring that requires the addition of assist gas to Pr ntblaek-smoke- 13-567 Flare Relief 11/14/2013 12:00:00 am 12:00:00 am 1440 min No No Yes BPIIKIRSCHW 13000 Determination Cause D -bank taken offline for SSR Project Cutover. Although oil rate is over 60,000 bpd, the LP/IP gas compression system is not designed for today's gas conditions when only banks A, B & C are online without D -bank. Action Taken V-136 flare Wtpoint intentionally lowered to minimize the volume flared by preventing LP flaring that requires the addition of assist gas to r - p vent lack s 13-568 Flare Relief 11/15/2013 12:00:00 am 12:00:00 am 1440 min No No Yes BP111CIRSCHW 13000 Generated 12/02/2013 1:44:10PM Page 5 of 8 Flare Start Date 11/01/2013 Flare End Date 11/30/2013 Determination Cause D -bank taken offline for SSR Project Cutover. Although oil rate is over 60,000 bpd, the LP/IP gas compression system is not designed for today's gas conditions when only banks A, B & C are online without D -bank. Action Taken V-136 flare setpoint intentionally lowered to minimize the volume flared by preventing LP Flaring that requires the addition of assist gas to oreventbladr smnkr- - 13-569 Flare Relief 11/16/2013 12:00:00 am 12:00:00 am 1440 min No No Yes BP1\KIRSCHW 13000 Determination Cause D -bank taken online for SSR Project Cutover. Although oil rate is over 60,000 bpd, the LP/IP gas compression system is not designed for today's gas conditions when only banks A, B & C are online without D -bank. Action Taken V-136 flare setpoint intentionally lowered to minimize the volume flared by preventing LP flaring that requires the addition of assist gas to —prevent black smoke 13-570 Flare Relief 11/17/2013 12:00:00 am 12:00:00 am 1440 min No No Yes BP1\KIRSCHW 13000 Determination Cause D -bank taken offline for SSR Project Cutover. Although oil rate is over 60,000 bpd, the LP/IP gas compression system is not designed for today's gas conditions when only banks A, B & C are online without D -bank. Action Taken V-136 flare setport intentionally lowered to minimize the volume flared by preventing LP flaring that requires the addition of assist gas to -. -.--preventAlack-smoke— 13-571 Flare Relief 11/18/2013 12:00:00 am 12:00:00 pm 720 min No Determination Cause V-136 flare opened due to D -Bank SSR project. Action Taken D -Dank BIS 13-573 Flare Relief 11/19/2013 12:00:00 am 12:00:00 am 1440 min Yes Determination Cause Depressure tat and 2nd stage C -bank for leaking gasket Action Taken replaced gasket No Yes 8P1WRSCHW 6500 No Yes BPI\KIRSCHW 2600 13-574 Flare Relief 11/20/2013 11:43:00 am 6:56:00 pm 433 min Yes No No BP1\SELFJR 1856 Determination Cause Odd reboiler shut down causing gas temp to get high and comp lost forward flow Action Taken V-136 flare setpoint intentionally lowered to minimize the volume flared by preventing LP flaring that requires the addition of assist gas to __...-t eventblack-smoke- Total Volume (MSCF) 112714 12/02/2013 1:44:10PM Page 6 of 8 Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Tuesday, November 12, 2013 8:22 AM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, OPS GCI Facility OTL; AK, OPS GC1 OSM; AK, HSSEE Env Adv West Subject: Gas flaring events To: Jennifer Hunt, AOGCC ien n fifer. h unt(a2alaska. aov CC: Dave Roby, AOGCC dave.robv aaalaska.00v From: Travis Rybicki, GPB Production Optimization Team Leader CC: Victoria Ferguson, AOGCC victoria.femusonaalaska oov A flaring event occurred at GC1 starting at 11/04/2013 07:35 and stopping at 11/04/2013 08:36 with a volume of 1020 (MSCF). The intermittent event lasted for 61 minutes and was due to flaring from the GC1 facility associated with an unplanned modified stop production (shutdown) of GC1 caused while technicians were troubleshooting a panel. Flaring ended when the problem was resolved and GC1 was restarted. A flaring event occurred at GC1 starting at 11/10/2013 07:30 and stopping at 11/10/2013 24:00 with a volume of 8938 (MSCF). The event lasted for 990 minutes and was due to flaring off the LP/IP system due to low oil rates associated with the planned shutdown of the GC1 D Bank separation train for ongoing Safety System Renewal (SSR) work. Flaring continued into the following day. A flaring event occurred at GC1 starting at 11/11/2013 00:00 and stopping at 11/11/2013 24:00 with a volume of 13000 (MSCF). The event lasted for 1440 minutes and was due to flaring off the LP/IP system due to low oil rates associated with the planned shutdown of the GCI D Bank separation train for ongoing Safety System Renewal (SSR) work. Flaring continued into the following day. Please let me know if you have any questions. Travis M. Rybicki PCC•EOC (Production Optimization) Team Lead Office 907-659-4472 (BOC) 659-5566 (PBOC) Cell 907-748-2118 Harmony 758-4404 GPB Pager 907-659-5272 # 1890 akor)spcceoctl(a)bp com Alternate: Kellie Okonek Kellie Okonek (alt. Travis Rybicki) PCC/EOC Production Optimization TL external: (907) 659 4472 (BOC) 15566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akopspcceoctl(a)bp.com Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL (AKOPSPCCEOCTL@bp.com] Sent: Sunday, November 17, 2013 10:11 AM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS PCC EOC TL; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; Kruger, Dale O; AK, H SEE Env Adv West Subject: Gas flaring events a To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC iennifer.hunt(@alaska.gov dave. robv(rDalaska. gov victoria.ferguson(a.alaska qov From: Kellie Okonek, GPB Production Optimization Team Leader A flaring event occurred at GCI starting at 11/12/2013 00:00 and stopping at 11/13/2013 with a volume of 13000 (MSCF). The event lasted for 1440 minutes. The event had a volume greater than 5000 (MSCF). Flaring continued at GCI starting at 11/13/2013 00:00 and stopping at 11/14/2013 with a volume of 13000 (MSCF). The event lasted for 1440 minutes. The event had a volume greater than 5000 (MSCF). Flaring continued at GCI starting at 11/14/2013 00:00 and stopping at 11/15/2013 with a volume of 13000 (MSCF). The event lasted for 1440 minutes. The event had a volume greater than 5000 (MSCF). Flaring continued at GC1 starting at 11/15/2013 00:00 and stopping at 11/16/2013 with a volume of 13000 (MSCF). The event lasted for 1440 minutes. The event had a volume greater than 5000 (MSCF). Flaring continued at GC1 starting at 11/16/2013 00:00 and stopping at 11/17/2013 with a volume of 13000 (MSCF). The event lasted for 1440 minutes. The event had a volume greater than 5000 (MSCF). These events are due to D -bank being taken offline for the planned SSR cutover. V-136 flare setpoint intentionally lowered to minimize the volume flared by preventing LP flaring that requires the addition of assist gas to prevent black smoke. Please let me know if you have any questions. Kellie Okonek (alt. Travis Rybicki) PCC/EOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akoosocceoctl@bo com Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com) Sent: Sunday, November 24, 2013 3:12 PM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS PCC EOC TL; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; Kruger, Dale O; AK, HSSEE Env Adv West Subject: Gas flaring events a To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC en niter. h u nt(a)alaska. gov dave. robv(a)alaska.gov victoria.ferauson(cDalaska.00v From: Kellie Okonek, GPB Production Optimization Team Leader A flaring event occurred at GC1 starting at 11/20/2013 11:43 and stopping at 11/20/2013 18:56 with a volume of 1856 (MSCF). The event lasted for 433 minutes and was due to Odd reboiler shut down causing gas temp to get high and compressor lost forward flow. V-136 flare setpoint was intentionally lowered to minimize the volume flared by preventing LP flaring that requires the addition of assist gas for prevention of black smoke. A flaring event occurred at GC1 starting at 11/19/2013 00:00 and stopping at 11/20/2013 with a volume of 2600 (MSCF). The event lasted for 1440 minutes and was due to depressurization of 1 st and 2nd stage C -bank for a leaking gasket. Flaring stopped when the gasket was replaced. A flaring event occurred at GC1 starting at 11/18/2013 00:00 and stopping at 11/18/2013 12:00 with a volume of 6500 (MSCF). The event lasted for 720 minutes. The event had a volume greater than 5000 (MSCF). A flaring event occurred at GCI starting at 11/17/2013 00:00 and stopping at 11/18/2013 with a volume of 13000 (MSCF). The event lasted for 1440 minutes. The event had a volume greater than 5000 (MSCF). These events are due to D -bank being taken offline for the planned SSR cutover. V-136 flare setpoint intentionally lowered to minimize the volume flared by preventing LP flaring that requires the addition of assist gas to prevent black smoke Please let me know if you have any questions. Kellie Okonek (alt. Travis Rybicki) PCC/EOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akoosccceoctl(a)by.com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000031 2. Facility Name PBU GC 1 3. Field PBU - WOA 4. Operator BP 5. Month/Year of Disposition I December -2013 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution or each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected O PRUDHOE 640150 99.883/. LISBURNE 640144 0.00% 8. Flared or vented hour or less 500 MIDNIGHTSUN 640158 0.12% PT MCINTYRE 640180 0.00% 9. Flared or vented more than 1 hour (see instr.) 2,260 10. Pilot and Purge 56,112 11. Assist Gas 0 12. Fuel gas used in lease operations. 803,221 13. Other (see instructions) U Official Use Only Authorization >l hr Safety Z D MCF 14. TOTAL VOLUME (ITEMS 6-12) 862,093 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 L Commissioner Date 18. Transferred to: (Express as a negative #) CGF -75,132,157 19. Remarks: I hereby certify that thA foregoing is true and correct to the best of my knmledge. �//�,1 Note: All volumes must be corrected Signature IDYL' I U Title Mana er Production Taxes and R alties Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date / AAC25.235. rt, i f-/7/>¢ Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT -GC -1 GAS FLARING INCIDENT REPORT December 2013 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 12/3/2013 1620-1649 440 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr 12/15/2013 1325-1335 60 TOTAL 500 DATE TIME 12/1/2013 0730-0915 12/7/2013 0910-1030 12/11/2013 0803-0945 12/8/2013 1606-1748 TOTAL 1E DESCRIPTION OF INCIDENT & 1,000 See attachments 220 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf See attachments ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 Planned Events Exceeding 1 Hour OR> 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 12/8/2013 0810-0947 90 See attachments See attachments 12/8/2013 1606-1748 380 TOTAL 470 TOTAL Unplanned Events < 1 Hour 500 Unplanned Events> 1 Hour 1,790 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 470 exceeding 5,000 MCF Pilot Purge 56,112 Assist 0 TOTAL FLARED VOLUME 58,872 Page 7 1/12/2014 10:27 AM Flare Start Date 12/01/2013 Flare End Date 12/31/2013 GC1 Flare Report Total Volume (MSCF) 2760 Report Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 13-580 Flare Relief 12/01/2013 7:30:00 am 9:15:00 am 105 min Yes No No BPI\FUELMO 1000 Determination Cause High transit gas pressure causing and flaring off of V-136 Action Taken Transit gas pressure returned to normal and flaring was stopped. .. ............... __. __. _._'___.. _._..._ ................. .....-._-.-.-._. __._.. _........ ..... ... .... ........... ....____........... 13-585 Flare Relief 12/07/2013 9:10:00 am 10:30:00 am 80 min Yes No No BP1\SELFJR 220 Determination Cause Y-LDF HAS CRACK ON WELD INSIDE SKID 450 NEED TO DEIVENTORY LINE Action Taken PIGGING Y-LDF FOR REPAIRS TO CRACK ON LINE IN SKID 450 13-586 Flare Relief 12/08/2013 81000 am 9:47:00 am 97 min No No Yes BPI\BIFFERDL 90 Determination Cause Pigging Y-LDF for line repair. Action Taken As soon as pigs were in shut off. __. ........... .. ............... ....... __. _._ ..._ ................ ._... __. 13-586 Flare Relief 12/08/2013 4:06:00 pm 5:48:00 pm 102 min No No Yes BP1\BIFFERDL -...... _. 380 Determination Cause Dropping GLT line presure at Y -Pad while Pad is down for line repairs on LDF crack in pipe skid 450 at GC1 Action Taken Shutoff as soon as presurewas low enough at pad, on GILT line. 13-589 Flare Relief 12/11/2013 8:03:00 am 9:45:00 am 102 min Yes No No BPI\SPRINGG 570 Determination Cause K-107/108 surging up&down Action Taken Waiting for compressors to settle out Total Volume (MSCF) 2760 Generated 01/06/2014 9:50:43AM Page 6 of 6 Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Tuesday, December 10, 2013 11:45 AM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; AK, HSSEE Env Adv West Subject: Gas flaring events aSgft To: Jennifer Hunt, AOGCC Wenn iter. h untCcDalaska.gov CC: Dave Roby, AOGCC dave. robv(cDalaska. gov From: Travis Rybicki, GPB Production Optimization Team Leader CC: Victoria Ferguson, AOGCC victori a. ferg uson (cbalaska.gov A flaring event occurred at GC1 starting at 12/01/2013 07:30 and stopping at 12/01/2013 09:15 with a volume of 1000 (MSCF). The intermittent event lasted for 105 minutes. Flaring was due to high transit gas pressures resulting in flaring from the V-136 IP Gas KO Vessel. Flaring continued while transit gas pressures were stabilized. Flaring ended when trans it gas pressure returned to normal ranges. A flaring event occurred at GC1 starting at 12/07/2013 09:10 and stopping at 12/07/2013 10:30 with a volume of 220 (MSCF). The event lasted for 80 minutes. Flaring was due to flaring off of C Bank Slug Catcher during the de -inventory pigging operations on the Y Pad LDF. The LDF was shut down a few days prior due to a crack identified in Skid 450. Flaring ended when pigging operations were completed for the day. A flaring event occurred at GC1 starting at 12/08/2013 08:10 and stopping at 12/08/2013 09:47 with a volume of 90 (MSCF). The event lasted for 97 minutes. Flaring was due to flaring off of C Bank Slug Catcher during the de -inventory pigging operations on the Y Pad LDF. The LDF was shut down a few days prior due to a crack identified in Skid 450. Flaring ended when pigging operations were completed for the day. A flaring event occurred at GC1 starting at 12/08/2013 16:06 and stopping at 12/08/2013 17:48 with a volume of 380 (MSCF). The event lasted for 102 minutes. Flaring was due to flaring off of C Bank Slug Catcher during the de -pressuring of the Y Pad GLT supply line, via the Y Pad LDF. The GLT supply line was de -pressured as a precautionary measure, while the LDF is down for repairs. Flaring ended when the GLT supply line was sufficiently de -pressured. Please let me know if you have any questions. Travis M. Rybicki PCC-EOC (Production Optimization) Team Lead Office 907-659-4472 (BOC) 659-5566 (PBOC) Cell 907-748-2118 Harmony 7584404 GPB Pager 907-659-5272 # 1890 akopspcceocti(a.bp. Com Alternate: Kellie Okonek Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Monday, December 23, 2013 10:14 PM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS GCI Facility OTL; AK, OPS GCI OSM; Kruger, Dale O; AK, HSSEE H&S Adv West GC1 GC3) Subject: Gas flaring event aNIFIM To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC jennifer.hunt(cbalaska.gov dave.roby(a)alaska.00v victoria. fern usonealaska.4ov From: Kellie Okonek, GPB Production Optimization Team Leader A flaring event occurred at GCI starting at 12/11/2013 08:03 and stopping at 12/11/2013 09:45 with a volume of 570 (MSCF). The event lasted for 102 minutes, and was due to K-107/108 surging up and down. Flaring stopped once the compressors settled out. Please let me know if you have any questions. Kellie Okonek (alt. Travis Rybicki) PCC/EOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akopsocceoctl(aft corn