Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPBU GC 3 Gas DispositonState of Alaska AOGCC Gas Disposition Files Year: 2013 Facility: PBU GC 3 Operator: BP EXPLORATION (ALASKA) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000033 2. Facility Name PBU GC 3 3. Field PBU - WOA 4. Operator BP 5. MonthlYear of Disposition I January -2013 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 846 10. Pilot and Purge 17,816 11. Assist Gas 0 12. Fuel gas used in lease operations. 513,275 13. Other (see instructions) 6 Official Use Only� Authorization >7 hr Safety MCF 14. TOTAL VOLUME (ITEMS 6.12) 531,937 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 `1 / n 18. Transferred to: (Express as a negative #) CGF -25,445,337 Commissioner Date 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. /'�///n�Y�n//�n///�f /n Note: All volumes must be corrected Signature M! f Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 Asia and to a �J 2 temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date �, J(} ✓ AAC25.235. !/L F 3/zq/13 Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate FITTIV Fon 114 1/20/2013 TIME TOTAL TOTAL TOTAL 1715-2130 TOTAL Unplanned Events < 1 Hour Unplanned Events > 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -3 GAS FLARING INCIDENT REPORT January 2013 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr I DESCRIPTION OF INCIDENT & CAUSE See Attachments n See Attachments 0 846 See Attachments 846 TOTAL 0 0 0 846 17,816 0 18,662 See Attachments See Attachments ACTION TAKEN TO ELIMINATE See Attachments Page 8 2/13/2013 3:46 PM Flare Start Date 01/01/2013 Flare End Date 01/31/2013 GC3 Flare Report Total Volume (MSCF) 846 Report Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 13-34 Flare Relief 01/20/2013 5:15:00 pm 9:30:00 pm 255 min No No Yes BPl WAWKJ5 845 Determination Cause Depressured the"A"LDF line and"C" Slugcatcherto the flare in orderto remove energy from the"XLDF fortagout.(Repairs are needed to the"A"LDF due to corrosion issues.) Action Taken When the "A" LDF line reached zero energy (no pressure). the deoressurino of the line was discontinued. Total Volume (MSCF) 846 Generated 02/04/2013 3:54:59PM Page 10 of 10 McMains Stephen E (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj Sent: Friday, February 01, 2013 8:10 AM To: McMains, Stephen E (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, OPS GC3 Facility & Field OTL; AK, OPS GC3&PCC OSM; AK, HSSEE Env Adv West Subject: Gas flaring event at GC3 To: Steve McMains, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC Steve mcmains(o)alaska.gov dave.roby(a alaska.gov victoria.ferq uson (d,)alaska. gov From: Travis Rybicki, GPB Production Optimization Team Leader A flaring event occurred at GC3 starting at 01/20/2013 17:15 and stopping at 01/20/2013 21:30 with a volume of 846 (MSCF). The event lasted for 255 minutes. Flaring was due to the planned depressurization of the A Pad LDF (large diameter flowline) via the C Bank LPS Slugcatcher to perform energy isolation activities for the LDF in preparation for planned work on the LDF. Flaring ended when the depressuring activities on A LDF were completed and the flare valves were closed. Please let me know if you have any questions. Travis M. Rybicki PCC-EOC (Production Optimization) Team Lead Office 907-659-4472 (BOC) 659-5566 (PBOC) Cell 907-748-2118 Harmony 758-4404 GPB Pager 907-659-5272 # 1890 akoosocceoctl(o bp..com Alternate: Kellie Okonek STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 0290000033 PBU GC 3 Disposition 3. Field PBU - WOA Volume MCF 4. Operator 5. MonthlVear of Disposition BP I February -2013 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 16,400 11. Assist Gas 0 12. Fuel gas used in lease operations. 472,376 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 488,776 Lease Use MCF 15, NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas O Waste: MCF 17. Transferred from: U Commissioner Date 18. Transferred to: (Express as a negative #) CGF -23,692,825 19. Remarks: I hereby certify that the aforegoing is true and correct to the best of my knowledge. J4Note: All volumes must be corrected Signature Title Manager Production Taxes an Ro @ Ities Alaska to pressure of 14.65 psia and to a Printed Name Diane Colley Phone (907) 564-5775 Date /✓ temperature of 60o F. Authority 20AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -3 GAS FLARING INCIDENT REPORT February 2013 Events less than or equal to 1 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr TOTAL 0 See Attachments See Attachments TOTAL 0 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Planned Events Exceeding 1 Hour OR> 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 16,400 Assist 0 TOTAL FLARED VOLUME 16,400 Page 8 3/13/2013 9:52 AM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000033 2. Facility Name PBU GC 3 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition March -2013 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold Pool Name Pool Code Percent 7. Reinjected 0 B. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 16,918 11. Assist Gas 0 12. Fuel gas used in lease operations. 524,149 13. Other (see instructions) D Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 541,067 Lease Use MCF 15. NGL Gas Equivalent U Conservation MCF 16. Purchased gas U Waste: MCF 17. Transferred from: 0 Commissioner Date 18. Transferred to: (Express as a negative #) CGF -26,198,561 19. Remarks: I hereby certify that the fo oing is true and correct to the best of my knowledge. �nj Note: All volumes must be Corrected Signature _ U Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a h temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date V AAC25.235. Form 10-422 Rev. W009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -3 GAS FLARING INCIDENT REPORT March 2013 Not required for unplanned events <=1 hr TOTAL 0 See Attachments TOTAL 0 or Equal 1 Hour AND <= See Attachments TOTAL 0 See Attachments TOTAL 0 Not required for unplanned events <= 1 hr See Attachments See Attachments See Attachments Page 8 4/10/2013 1:30 PM TOTAL Unplanned Events < 1 Hour 0 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 16,918 Assist 0 TOTAL FLARED VOLUME 16,918 Not required for unplanned events <= 1 hr See Attachments See Attachments See Attachments Page 8 4/10/2013 1:30 PM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000033 2. Facility Name PEI GC 3 3. Field --TBP PBU - WOA BP 5. MonthNear of Disposition A r 1-2013 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 10 9. Flared or vented mom than 1 hour (see instr.) 0 10. Pilot and Purge 10,798 11. Assist Gas 0 12. Fuel gas used in lease operations. 458,540 13. Other (see instructions) 0 Official Use Only Authorization >i hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 469,348 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 18. Transferred to: (Express as a negative #) CGF -24,663,973 Commissioner Date 19. Remarks: I hereby certify that th regoing is trug and correct to the best of my knowledge. Note: All volumes must be corrected Signature Title Manager Production Taxes and Ro Ities Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date14-A AAC25.235. Form 10422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT -GC -3 GAS FLARING INCIDENT REPORT Page 10 April 2013 jUnplanned Events less than or equal to 1 hour ri DATE TIME VOLUME. DESCRIPTION OF INCIDENT &CAUSE ACTION TAKEN TO ELIMINATE CAUSE 4/22/2013 0500-0520 10 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr TOTAL 10 Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT &CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 5/14/2013 10:22 AM See Attachments See Attachments TOTAL 0 Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 10 Unplanned Events> 1 Hour 0 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 10,798 Assist 0 TOTAL FLARED VOLUME 10,808 5/14/2013 10:22 AM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000033 2. Facility Name PBU GC 3 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition I May -2013 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume, 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 16,925 10. Pilot and Purge 14,626 11. Assist Gas 0 12. Fuel gas used in lease operations. 500,308 13. Other (see instructions) 0 Official Use Only Authorization >i hr: Safety cIZ. MCF 14. TOTAL VOLUME (ITEMS 6.12) 531,859 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 / —3 / le Commissioner Date 18. Transferred to: (Express as a negative #) CGF -25,076,043 19. Remarks: I hereby certify that the oregoing is true and correctto the best of my knowledge. Note: All volumes must be corrected Signature Title Manager Production Taxes and Ro alties Alaska to pressure Of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235. Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT -GC -3 GAS FLARING INCIDENT REPORT May 2013 Not required for unplanned events <= 1 hr ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events <= 1 hr TOTAL 0 Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL TOTAL 5/11/2013 0300-1830 5/17/2013 0715-0915 TOTAL Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME See Attachments Al See Attachments O 16,146 See Attachments 779 16,925 TOTAL 0 0 0 16,925 14,626 0 31,551 See Attachments ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments Page 11 6/13/2013 2:28 PM Flare Start Date 05/01/2013 Flare End Date 05/31/2013 GC3 Flare Report Total Volume (MSCF) 16925 Report Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 13-246 Flare Relief 05/11/2013 3:00:00 am 6:30:00 pm 930 min No No Yes BP1\VAUGHNM 16146 Determination Cause Depressured GHX line from GC -1 to GC -3 for pig launcher installation. Also depressured test bank and C -Slug Catcher Action Taken EgJob complete and system back to normal. 13-262 Flare Relief 05/17/2013 7:15:00 am 9:15:00 am 120 min Yes No Yes BP1\MOORDV 779 Determination Cause Depressurizing Annex tie -line for pigging. Action Taken No response taken as this was deemed to be of short duration. Total Volume (MSCF) 16925 Generated 06/10/2013 9:22:50AM Page 14 of 14 Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj Sent: Tuesday, May 14, 2013 1:35 PM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, HSSEE Env Adv West; AK, OPS FS1 Facility OTL; AK, OPS FSI OSM; Burgess, David H; AK, HSSEE Env Adv East; AK, OPS FS3 OSM; AK, OPS FS3 Facility OTL Subject: Gas flaring events at GC3, FS3, and FS1 To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC a ennifer.hunt@alaska.gov dave.robv@alaska.eo_v victoria ferguson@alaska.gov From: Kellie Okonek, GPB Production Optimization Team Leader A flaring event occurred at FS1 starting at 05/10/2013 20:35 and stopping at 05/10/2013 23:58 with a volume of 987 (MSCF). The event lasted for 203 minutes and was due to shutdown of 1802 T/C due to a problem associated with oil pressure. Flaring stopped when the compressor was re -loaded. A flaring event occurred at FS3 starting at 05/11/2013 13:02 and stopping at 05/11/2013 14:36 with a volume of 70 (MSCF). The event lasted for 94 minutes. at FS3 starting at 05/11/2013 01:05 and stopping at 05/11/2013 03:00 with a volume of 40 (MSCF). The event lasted for 115 minutes and was due to spin cooling of 1803 LPS compressor for water wash. Flaring stopped when cooling complete. A flaring event occurred at FS3 starting at 05/13/2013 01:15 and stopping at 05/13/2013 03:15 with a volume of 40 (MSCF). The event lasted for 120 minutes and was due to spin cooling of 1804 LPS compressor for water wash. Flaring stopped when cooling complete. A flaring event occurred at GC3 starting at 05/11/2013 03:00 and stopping at 05/11/2013 18:30 with a volume of 16146 (MSCF). The event lasted for 930 minutes. The event had a volume greater than 5000 (MSCF) and was due to depressurization of the GHX line for planned pigging activities. Flaring stopped when the line was depressured. Please let me know if you have any questions. Thanks, Kellie Okonek (alt. Travis Rybicki) PCCIEOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akopspcceoctICcDbp com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1, Facility Number 0290000033 2. Faciliry Name PB GC 3 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition June -2013 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 208 9. Flared or vented more than 1 hour (see instr.) 2,551 10. Pilot and Purge 7,933 11. Assist Gas 0 12. Fuel gas used in lease operations. 96,091 13. Other (see instructions) 0 Official Use Only Authorization >1 hr'. Safety �2 � T MCF 14. TOTAL VOLUME (ITEMS 6-12) 106,783 Lease Use MCF 15, NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 n J 18. Transferred to: (Express as a negative #) CGF -5,906,523 Commissioner Date 19, Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature. Title Manager Production Taxes and Royalties Alaska Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Diane Colley Phone (907) 564-5775 Date b/L-F- 4 fJ1 -3113 J-1/13113 Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate 6/29/2013 TOTAL 2109-2210 TOTAL BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -3 GAS FLARING INCIDENT REPORT June 2013 Not required for unplanned events <= 1 hr 0 551 See Attachments 551 & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events <= 1 hr ACTION TAKEN TO E See Attachments 6/5/2013 2055-2105 208 See Attachments See Attachments TOTAL 208 Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 6/7/2013 0005-0900 2,000 See Attachments See Attachments TOTAL 2,000 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events > 1 Hour 551 Planned Events < 1 hour and not 208 exceeding 5,000 MCF Planned Events > 1 hour or 2,000 exceeding 5,000 MCF Pilot Purge 7,933 Assist 0 TOTAL FLARED VOLUME 10,692 Page 8 7/16/2013 11:26 AM Flare Start Date 06101/2013 Flare End Date O6/30/2013 GC3 Flare Report Total Volume (MSCF) 2759 Report Numbs System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 13-294 Flare Relief 06/05/2013 8:55:00 pm 9:05:00 pm 10 min No No Yes BP1tPRESD3 208 Determination Cause Sk 40 Open 611 and add assist gas to bum residuals out of bum pit line, dp Action Taken Remove assist gas and Gose 611, return to normal. dp 13-296 Flare Relief 06/07/2013 12:05:00 am 9:00:00 am 535 min No No Yes BPIIHAWKJS 2000 Determination Cause Depressured the plant for scheduled TAR. Action Taken Bled down pressure to zero state as needed for the shutdown. Bled down pressure from LDFs, HP Separators, and Slug Catchers. 13-340 Flare Relief 06/29/2013 7:09:00 pm 8:10:00 pm 61 min Yes No No BP1tPRESD3 551 Determination Cause Lost LPS compressor due to thermocouple deviations and V4 recycle valve VP falu e. Action Taken Cut production and started Compressor after Repairs were made. Total Volume (MSCF) 2759 Generated 07/09/2013 4:10:03PM Page 10 of 10 salnu!w 077E J01 palsel Juana agl'(dOSW) Olo awnlon a ql!m £LOZ/OL/901e 6u!ddo;s pue 0000 £LOZ/60/90 le 6ullJels L00 le salnup 077L Jo; palsel Juana aqi '(jOSIN) O to awnlon a qpm £ LOZ/L L/901e 6u!ddols pue 0000 £LOZ/OL/901e 6uluels LOO Je -sa;nww 077E J01 palsel;uana agl'(dOSIN) Olo awnlon a ql!m £LOZ/LL/901e 6u!ddols pue 0000 £LOZ/OL/90;e 6URRIS LOOle salnup 0717L Jol Palse! Juana aqi '(dOSIN) O to awnlon a qJ!m £LOZ/ZL/901e 6u!ddo;s pue 0000 £LOZ/L L/901e 6u!lJels LOO le salnww 077E Jo; palsel Juana agJ '(jOSIN) O;o awnlon a ql!m £ LOZ/£ L/90 le 6u!ddols pue 0000 £ LOZ/Z L/90 le 6u!lJels LOJ le salnu!w 077E Jo; palsel;uana agl'(dOSW) Olo awnlon a ql!m £LOZ/7L/901e 6u!ddols pue 0000 £LOZ/£L/901e 6u!1Je1s LOO;e pann000 6uueq ou 1egJ JJoddns aJo;aJag1 pue Jlep ag1 Jo; 6!sd 0 pamogs sJoleo!pu! aJnssaJd Japeaq aJell aqi Ja1aw loaJJooui ue;o llnsaJ aqi aq o; poolsJapun Jagaq mou aJe go!gm ' LOJ le panssi aJam slJodaJ 6uueg snolnaJd ao!nJas of pauJn;a O/1 aq; pue peoe!daJ seen pJeo agl uagm paddols 6uueld pjeo uoilejq!A pale; a eoeldaj of aoueue;u!ew pauueld Jol g09 L 011 to umop;ngs of anp seen pue '(dOSW) 0009 ueq; Jaleak awnlon a peg Juana aqi -salnu!w 96 Jo; passel Juana agJ '(dOSW) 0L7ZL to awnlon a ql!m 0L:OZ £LOZ/ZO/90;e 6u!ddols pue Z£:gL £LOZ/ZO/90;e 6ulpels dOO le paJJn000;uana 6uueg V paz!lpels suoijaiado Ll!I!oel pue papeol-aJ sem JossaJdwoo agl pue alaldwoo seen 6u!loogsalgnoJl uegm paddols 6u!Jeld umopings JossaJdwoo IIN 998E of anp seen pue '(jOSIN) 0009 ueql Ja;e9J6 awnlon a peq Juana aqi sa;nup 86 Jo; passel Juana aqi '(JOSW) 8L9LL to awnlon a qJ!M OL 7L £LOZ/LO/90le 6u!ddo;s pue Zq:OL £LOZ/LO/90;8 6ulJJe1s dOO le paJJn000 Juana 6u!Jeg V a;aldwoo sem uogezunsseidep uagM paddols 6uueld vo!lelos! u!eJl-8 pauueld a Jo; lueld aq; to uo!;ez!JnssaJdap o; anp sem pue (dOSW) 0009 uegl Ja1eaJ6 awnlon a peg Juana agJ salnuu 00£ Jol pa;sel Juana agJ '(dOSW) 97gg;o awnlon a g;!M OO:ZL £LOZ/L0/90le 6ulddols pue 0010 £LOZ/LO/90 le 6u!JJe;s ZSd le paJJn000;uana 6u!Je0 V Japeal weal uo!lez!w!ld0 uo!lonpoJd BdJ VuM aQ!aN :woJd AOb eJ sele uosn Ja; e!Jolo!n no e�se!e goranep OOJOV 'uosn6Jad e!J0101n :00 OOJOV 'AgoN aneO 00 no esele lunq Ja;!uua. OOJOV 'lunH Ja;!uuaf :oi LSd tWe' LOJ 'dJO 'ZSd le sluana 6u!Jel; seO :Joa[gnS ll0 Al!I!oed LSd SdO 'NV ASO LSd SdO 'NV 110 P191d'8 41!0ed £OJ SdO 'NV 'WSO 00d'8£OO SdO 'NV'leJ1u90 APV nu3 33SSH 'NV 'lsaM APV Au3 33SSH 'NV'll0 Al!I!oed ZSd SdO 'NV ASO ZSd SdO 'NV ASO M SdO 'NV 'll 003 00d SdO 'NV 'f w!oO 'uepJo!a,0 Ilio Al!I!oed 100 SdO 'NV'WSO J00 dOO SdO 'NV 'll0 d00 SdO 'NV'H P!ne4 'ssa6Jnq 'lss3 APV Au3 33SSH 'NV !ko6aJ0 'Jng1JV 'V AJeO 'uosuag'eJpuefalV 'ouelse0 '(VOQ) S p!nea 'Rgoa'(VOQ) l euo;o!n 'uosn6Jad :30 (VO(]) l Ja;!uuar ';unH :ol Wd L L:£ £ LOZ 'g0 aunp 'AepJnleS :JUGS [woo'dq@ll003OOdSdOAV1 ll 003 OOd SdO 'NV :wojd voa) l as;[uuar ;unH at GC1 starting at 05/08/2013 00:01 and stopping at 05/09/2013 with a volume of 0 (MSCF). The event lasted for 1439 minutes. A flaring event occurred at GC3 starting at 06/07/2013 00:05 and stopping at 06/07/2013 09:00 with a volume of 2000 (MSCF). The event lasted for 535 minutes and was due to depressurization of the plant for planned TAR. Flaring stopped when depressurization complete. A flaring event occurred at FS1 starting at 06/01/2013 13:30 and stopping at 06/01/2013 16:00 with a volume of 834 (MSCF). The event lasted for 150 minutes and was due to shutdown of STV/IP 1802 compressor due to fuel gas knockout drum high level. Flaring stopped when the compressor was re-loaded. Please let me know if you have any questions. Kellie Okonek (alt. Travis Rybicki) PCC/EOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akopspcceocti(ilbp.com woo-cjqgljoo@oodscI0Nff l!ew-a WNW ssaooe - V03) 0696 Jo (9EZ4 # ssaooe -VON)) 4L9 Ja6ed 4044 99L :AuowaeH OLE 1, Z9£ (L06) :1193 (009d) 9999 / (009) ZL44 699 (L06) :lewaIXG ll uopez!w13d0 uol;3np0ad 0O3100d (!�o!gAH s!Mi ';le) iGUOMO 01I10)1 suo!lsanb Rue aneq noR l! mop aw;al aseald painssajdap mann su!e4 HO dH aq; uagm paddo;s 6uueld 'Niom punaeuwn; u!ej;-V X01 wnj(] gseld J91eWi-V'8 dl -V 'dH-8 'dH-V 10 uogezunssaadap o; anp sena pue sa;nuiw 696 sol pa;sel;uana aqi '(dOSW) 6Z6 10 awnlon a q;!m £0:170 £LOZ/O£/901e 6u!ddo;s pue 4900 £LOZ/0£/90 le 6u!je;s ZS3;e pajin000;uana 6uuejl V J9n!909a pue jagounel 6!d to lenowaJ Jo; s9u!!u0ww00 O-ZL pue 8-ZL to u01;ezunssaidep o; anp sem pue salnu!w 006 Jo; pa;se!;uana agi'(dOSW) Egg to awnlon a gl!m 0£: L L £1,0Z/LO/LO le 6u!ddols pue 09:60 £LOZ/LO/LO le 6u!ue;s LSd le pa.un000;uana 6uueg V a;aldwoo ainssajdap uagm paddols 6uueld aoueua;u!ew pauueld iol Z LS(]to uo!lezunssaidep o; anp sem pue selnu!w gZZ jol palsel;uana aql '(dOSW) Egg to awnlon a g;!m OZ:OZ £LOZ/60/LO le 6u!ddo;s pue g£:9L £LOZ/LO/LO le 6u!>Je;s 6Sd le paim000;uana 6uueg V papeol sem iossaidwoo Zogl a;ewe;le ag; uagm paddols 6wjeld sdwe; lua!gwe q6!q o; anp jossaidwoo dl/AAS L09 L aq; l0 6u!peolun o; anp sem pue salnu!w gg sol passel;uana aqi '(dOSIN) 179910 awnlon a q;!m gZ:LO £LOZ/9Z/901e 6u!ddo;s pue LO 00 £LOZ/9Z/901e 6u!;,els LSd;e pajin000;uana 6uuell V 'papeol sem jossaidwoo Log a;euiale aq; uagm paddo;s 6uueld sdwa; lua!gwe q6!q o; anp iossaidwoo dl//U S ZO9L aql l0 6u!peolun o; anp sem pue salnu!w g17L jol pa;sel;uana aqi '(dOSW) 170910 awn JOA a q;!m 00:£Z £LOZ/LZ/901e 6uiddols pue 9£:OZ £LOZ/LZ/9018 6u!ye;s LSd le pajin000;uana 6uue9 V alaldwoo smedaj jaue papeol-ai lossaidwoo pue pa!euno sem uoponpad uagm paddols 6uueld aml!el d/l amen apROaj t?A pue su0!;eIA9P aldn000wjaq; o; anp p/s jossaidwoo Sd1 0; anp sem pue sa;nu!w L9101 pa;sej;uana aql '(dOSW) L9910 awnlon a q;!m OL:OZ £LOZ/6Z/90;e bu!ddols PUB 60:6L £LOZ/6Z/90le bu!pe;s £OO;e pawn000;uana 6uueg V alaldwoo clmJe;s uagm paddols 6uueld dnpe;s 00££>i LIE) 6uunp 6uuell o; anp sem pue sa;nu!w 01717L lol passel;uana aql (dOSW) 0410 awnlon a q;!m £LOZ/90/LO le 6u!ddo;s pue 00:00 £LOZ/90/Lo le bu!>aels [OE) le paun000;uana 6uueg V umop loon jol snddoo to u!ds pue o00L->I jol;sal do -;,els o; anp sem pue sa;nu!w £L sol pa;sel;uana aqi '(dc)SW) O1, to awnlon a Qm 0L:66 £LOZ/6Z/9018 6u!ddo;s pue L9:LL £LOZ/6Z/90le 6u!pe;s LOO ;e pajm000;uana 6uueg V 9191dwoo sem uo!;ezunssaidep uagm paddols 6u!ae d papeol sem 1V 618 V03 uagm jossaidwoo il0 meds to uo!lezunssajdap o; anp sem pue sa;nu!w go 1, sol palsel;uana aqi '(dOSW) 06£ to awnlon a q;!m 9L:91, £LOZ/9Z/901e buiddo;s pue 0£:9L £ LOZ/9Z/901e 6u!;Jels LOJ;e pajin000;uana 6uue9 V japeal weal uogez!wgdO uogonpad 8d9 VuoM0 a!ga>{ :wad AOIJ eMsele uosn mal euolo!n AM else a goranep Ao eMse!e ;ung jal!uua. 00J0V 'uosn6jad euol3!n :00 OOJOV 'Ago21 ane(] :00 OOE)OV 'lunH Jal!uu9r :off, ZSd '1,s=1 '£OJ ' L0O le s;uana 6uueg se0 :43efgng 0 ale(] 'ja6nA>i'liO Al!l13ed LSd Sd0 '>IV 'INSO LSA Sd0 1HV11i0 Pla!d 8 A1!I!3ed £OJ Sd0 'NV ASO 00d'8£0J SBO NV ISS APV Au3 33SSH 'NV '110 f4!1!3ed ZSd Sd0 'NV'WSO ZSd SdO 'NV'INSO 1,00 Sd0 'SIV 110 A1!I!3ed 1,00 Sd0 ')(V 'H P!Ae(] 'ssa6jn8 ';se3 APV nu3 33SSH NV'tio6aa0 'jnquV 'V fue0 'uosua8'ejpuef9lV 'oue;se0'(VO0) S p!ne(]'RgoaI (VO(]) 1 euo;o!n'uosn6jad :00 (VO(]) l jal!uuar ';unH :01 INd91,:9£LOZ'LO (Inr'RepunS :;uaS [woo'dq@0110O300dSd0>1V] li 009 00d Sd0 NV :wojd od -! aa;!uuar `;unH STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000033 2. Facility Name PBU GC 3 3. Field PBU - WOA 4. Operator BP 5. Monlhlyear of Disposition July -2013 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented l hour or less 3,662 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 19,564 11. Assist Gas 0 12. Fuel gas used in lease operations. 499,570 13. Other (see instructions) U Official Use Only Authorization >l hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 522,796 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 Commissioner Date 18. Transferred to: (Express as a negative #) CGF -25,316,588 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature &d4i Title Mana er Production Taxes and R alties Alaska Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Diane Colley Phone (907) 564-5775 Date Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com) Sent: Sunday, July 07, 2013 6:18 PM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv East; Burgess, David H; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; AK, OPS FS2 OSM; AK, OPS FS2 Facility OTL; AK, HSSEE Env Adv West; AK, OPS GC3&PCC OSM; AK, OPS GC3 Facility & Field OTL; AK, OPS FSI OSM; AK, OPS FSI Facility OTL; Kruger, Dale O Subject: Gas flaring events at GC1, GC3, FS1, FS2 To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC iennifer hunt(aalaska.00v dave robvO-alaska.aov victoria.ferguson@alaska.gov From: Kellie Okonek, GPB Production Optimization Team Leader A flaring event occurred at GC1 starting at 06/28/2013 16:30 and stopping at 06/28/2013 18:15 with a volume of 390 (MSCF). The event lasted for 105 minutes and was due to depressurization of spare GLT compressor when EOA Big AL was loaded. Flaring stopped when depressurization was complete. A flaring event occurred at GC1 starting at 06/29/2013 17:57 and stopping at 06/29/2013 19:10 with a volume of 10 (MSCF). The event lasted for 73 minutes and was due to start-up test for K-7000 and spin of coppus for cool down. A flaring event occurred at GCI starting at 07/05/2013 00:00 and stopping at 07/06/2013 with a volume of 40 (MSCF). The event lasted for 1440 minutes and was due to flaring during GLT K3300 startup. Flaring stopped when startup complete. A flaring event occurred at GC3 starting at 06/29/2013 19:09 and stopping at 06/29/2013 20:10 with a volume of 551 (MSCF). The event lasted for 61 minutes and was due to LPS compressor s/d due to thermocouple deviations and V4 recycle valve I/P failure. Flaring stopped when production was curtailed and compressor re -loaded after repairs complete. A flaring event occurred at FSI starting at 06/27/2013 20:35 and stopping at 06/27/2013 23:00 with a volume of 604 (MSCF). The event lasted for 145 minutes and was due to unloading of the 1802 STV/IP compressor due to high ambient temps. Flaring stopped when the alternate 1801 compressor was loaded. A flaring event occurred at FS1 starting at 06/28/2013 00:01 and stopping at 06/28/2013 01:26 with a volume of 354 (MSCF). The event lasted for 85 minutes and was due to unloading of the 1801 STV/IP compressor due to high ambient temps. Flaring stopped when the alternate 1802 compressor was loaded.. A flaring event occurred at FSI starting at 07/01/2013 16:35 and stopping at 07/01/2013 20:20 with a volume of 851 (MSCF). The event lasted for 225 minutes and was due to depressurization of DS12 for planned maintenance. Flaring stopped when depressure complete. A flaring event occurred at FS1 starting at 07/07/2013 09:50 and stopping at 07/07/2013 11:30 with a volume of 851 (MSCF). The event lasted for 100 minutes and was due to depressurization of 12-B and 12-C commonlines for removal of pig launcher and receiver. A flaring event occurred at FS2 starting at 06/30/2013 00:54 and stopping at 06/30/2013 04:03 with a volume of 929 (MSCF). The event lasted for 189 minutes and was due to depressurization of A -HP, B -HP, A -IP & A -Treater Flash Drum for A -train turnaround work. Flaring stopped when the HP oil trains were depressured. Please let me know if you have any questions. Kellie Okonek (alt. Travis Rybicki) PCCIEOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akoosvcceoctlO_bo.com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000033 2. Facility Name PBU GC 3 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition I August -2013 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 2,400 10. Pilot and Purge 16,822 11. Assist Gas 0 12. Fuel gas used in lease operations. 512,514 13. Other (see instructions) 0 Official Use Only Authorization >t hr: Safety Z 'Ci G D MCF 14. TOTAL VOLUME (ITEMS 6.12) 531,736 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 �1 ---- [e TDate 18. Transferred to: (Express as a negative #) CGF -24,6221340 Commissioner 19. Remarks: I hereby certify that t foregoing is true anq correct to the best of my knowledge. Signature `l Title Manager Production Taxes and Ro alties Alaska Note: All volumes must be corrected to pressure Of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Diane ColleyPhone (907) 564-5775 Date / VL F Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate anned Events DATE Or equal t0 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT -GC -3 GAS FLARING INCIDENT REPORT August 2013 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr TOTAL 0 Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT&CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 8/23-24/2013 2100-1530 2,400 See Attachments See Attachments TOTAL 2,400 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events> 1 Hour 0 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events> 1 hour or 2,400 exceeding 5,000 MCF Pilot Purge 16,822 Assist 0 TOTAL FLARED VOLUME 19,222 Page 8 9/12/2013 3:32 PM Flare Start Date 08/01/2013 Flare End Date 08/31/2013 GC3 Flare Report Total Volume (MSCF) 2400 Report Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 13-430 Controlled Blowdown 08/23/2013 9:00:00 pm 12:00:00 am 180 min No No Yes BPIUMRTINJE 400 Determination Cause Relieve pressure below #250 for planned line lift 8 inspection of GT -13. Action Taken Pressure dropped W#250. 13-432 Controlled Blowdown 08/24/2013 12:00:00 am 3:30:00 pm 930 min Yes No Yes BP1\BESTM2 2000 Determination Cause Bleed pressure under 4250 to flare from GT -13 for line lift & inspection. Action Taken Pressure dropped under #250. Total Volume (MSCF) 2400 Generated 09/04/2013 10:13:15AM Page 12 of 12 wo6 q 1156955mpew-a (00 L9# ss900e - V03) 069L Jo (g£Z17 # SS900e - VOM) 17L9 Ja6ed 170171789L :/uowJeH OLEL Z8£ (L06) :I1a0 (009d) 9999 / (009) ZL1717699 (L06) :lewalx9 tl uo!lemw!ld0 uo!lonpwd 003/03d (!Ao!gA8 slneJJ lie) )[auoi!p 01II0M suo!lsenb (ue 9neg no/;! mou> aw;91 aseald ZOg L of pagol!ms suo!leJado uaym peddois 6uueld senssl leuogeJado 6ulneg L09L JossaJdwoo dl//US 01 anp sem pue salnu!w Zg Jo; palsel Juana agl (dOSW) Z48 ;o awnlon a gl!m ZZ:17L ELOZ/OZ/g0 le 6ulddols pue OO:EL ELOZ/OZ/g0 le 6u!1J83s ESd le paJJn000 Juana 6ulJegy 6!sd 09Z mo19q of paonpaJ aJnsseid uaym paddols 6uueld 'suogoodsul pauueld Jo; £ L -1J do uogezlJnsseidep of anp sem pue salnulw OE6 Jo; palsel Juana agl '(dOSW) OOOZ;o awnlon a g1!m 0£:9L ELOZ/17Z/801e 6ulddols pue 00:00 ELOZ/17ZI80 3e 6u.1Jels EOE:) 3e paJJnoOo Juana 6uue1; y suo!loedsul pauueld Jo; au!I E L -1J aql;o uo!lezunssaJdap of anp sem pue salnulw 99Z Jol palsel Juana 941 (dOSW) 08615 awnlon a gl!m ELOZ/17Z/80le 6u!ddols pue 917:6L £LOVEZ/80 le 6ullJe1s LOJ le paJJn000 Juana 6uueg V suo!loadsu! pauueld Jo; EL -1J eql;o uollezunssaJdap leu!; of anp sem PUB (dOSN!) 0009 uegj JaleaJ6 awnlon a peg Juana agl sa;nulw 9ZZ L Jol PalSel Juana aql '(dOSW) gZgL;o awnlon a gl!m Z9:OZ ELOZ/17Z/801e 6u!ddoJs pue 17Z:00 E LOZ/17Z/80 le 6ugJe;s LOO le paJJn000 Juana 6uuel; y An Aoeq 6uldLueJ sem ll°J se /1!!!gels leuolleJado Jo; sJossaJdwoo dl/dl agl jjo 6u!Jel; of anp sem pue (dOSW) 0009 uegj Jajm6 awnlon a peg Juana agl selnulw g£g Jo; pals81 Juana agl (dOSW) 8174910 awnlon a ql!m £ LOZ/gZ/8o le 6u!ddols PUB 17Z:E L E LOZ/17Z/80 le 6ullJels ZOJ le paJJn000 Juana 6uuelJ V aleJ pau!l se6;o dnlJels 6wJnp do aweo aJnssaJd wals/s 3!sueJl ag; se sJ0ss9Jdw00 sdl agl jjo 6uueg o; anp sem pue (dOSW) 0009 uegl Jale9J6 awnlon a peg Juana agl 'salnu!w 09L Jo; palsel Juana agl '(ZIOSIN) C99L;o awnlon a 41!m OO:E L £ LOZ/9Z/80 le 6u!ddols pue 00:00 E LOZ/9Z/80 le 6wJJels ZOO le paJJn000 Juana 6uue1; V Japeal weal uo!lez!w!ld0 uo!lonpoJd 9dJ 'mauom0 91119){ :woJd no gseie uosn Ja; eu0J0!n no e>Isele goranep AOT eAsele lung Jalluua, OOJOV 'uosn6Jad eU015!A :00 OOJOV 'Agoa 9ne0 :00 OOJOV 'lunH J911uu9r :01 £Sd '£OJ 'ZOO ' LOJ le sJuana 6uue9 se0 :loa[gng Jsel APV nu3 33SSH ')4V 'H P!Ae0 'ssa6Jng 'l10 A4!1158d ESd SdO '>IV'WSO £Sd SdO '>IV'WSO OOd'8EO9 SdO '>IV 'l1O P191=1,2 Al!I!6ed £OJ SdO '>IV'WSO ZOO SdO '>IV 'l10 Al!l!5ed ZOO SdO '>!V'JsaM APV Au3 33SSH W ASO LOO SdO 'AV'110 A!1!5ed LOD SdO '>! 'O 9180 'Ja6nJ>l'/uo6aJ0 'JngijV 'V Geo'uosueg'eJpue[a1V'oue;se0'(V00) S P.I(I' qOu W00) l 8U0J01n'uosn6J9d 53 (VOO) l Ja;!uuar 'lunH :01 Wd 90: L L £ LOZ 19Z lsnbnV ' (epunS :;uas [woo*dq@l1003OOdSdO)4VI 11 009 30d SdO'>IV :woJd bocci) -1 Ja}!uuar `junH STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000033 2. Facility Name PBU GC 3 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition I September -2013 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold O Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented l hour or less 16 9. Flared or vented more than 1 hour (see instr.) 1,739 10. Pilot and Purge 14,905 11. Assist Gas 0 12. Fuel gas used in lease operations. 459,717 13. Other (see instructions) U Official Use Only Authorization >1 hr: Safety �.� q / MCF 14. TOTAL VOLUME (ITEMS 6-12) 476,377 Lease Use MCF 15. NGL Gas Equivalent U Conservation MCF 16. Purchased gas U Waste: MCF 17. Transferred from: U Commissioner Date 18. Transferred to: (Express as a negative # CGF ( p 9 ) -23,205,593 19. Remarks: I hereby certify that Mis a nd orrect to the best of my knowledge. Note: All volumes must be corrected SignatureTitle Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date 10148 AAC25.235. Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -3 GAS FLARING INCIDENT REPORT September 2013 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 9/14/2013 0815-0819 16 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr TOTAL 16 Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 9/17-18/2013 2002-0200 1,239 See Attachments See Attachments TOTAL 1,239 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments 9/12/2013 TOTAL 1930-2100 TOTAL Unplanned Events < 1 Hour Unplanned Events > 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME O 500 See Attachments GYrP TOTAL 16 1,239 0 500 14,905 0 16,660 See Attachments Page 9 10/11/2013 8:58 AM Flare Start Date 09/01/2013 Flare End Date 09/30/2013 GC3 Flare Report Total Volume (MSCF) 1755 Report Numbs System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 13-456 Other 09/12/2013 7:30:00 pm 9:00:00 pm 90 min No No Yes BP1\BESTM2 500 Determination Cause Water Wash Turbine spindown. Action Taken Water Wash complete@ 21:00 13-470 Other 09/17/2013 8:02:00 pm 12:00:00 am 238 min No No No BP1\JOHNSOM 826 Determination Cause Wet Gas compressor shutdown because of control/instrumentation failure associated with a nitrogen purge failure Action Taken WOA reduced produc0on rates and shut-in 11 wells equaling 48 mmscfd. Wells were shut-in or choked back starting at 2100 hours. 13-471 Other 09/18/2013 12:01:00 am 2:00:00 am 119 min No No No BPIUGHNSOM 413 Determination Cause Wel Gas compressor shutdown because of control/instrumentation failure associated with a nitrogen purge failure Action Taken WOA reduced production rates and shut-in 11 wells equaling 48 mmscfd. Wells were shut-in or choked back starting at 2100 hours on Total Volume (MSCF) 1755 Generated 10/02/2013 9:20:43AM Page 10 of 10 Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Tuesday, September 17, 2013 9:41 AM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, OPS GC3 Facility & Field OTL; AK, OPS GC3&PCC OSM; AK, HSSEE Env Adv West Subject: Gas flaring event avow To: Jennifer Hunt, AOGCC Jennifer. h u nt(a)alaska.gov CC: Dave Roby, AOGCC dave. robvna alaska.gov From: Travis Rybicki, GPB Production Optimization Team Leader CC: Victoria Ferguson, AOGCC victoria.ferguson(a alaska.gov A flaring event occurred at GC3 starting at 09/12/2013 19:30 and stopping at 09/12/2013 21:00 with a volume of 500 (MSCF). The event lasted for 90 minutes. Flaring occurred during the planned water washing of LPS T/C K7000. Flaring ended when the planned water wash activities were completed. Please let me know if you have any questions. Travis M. Rybicki PCC.EOC (Production Optimization) Team Lead Office 907-659-4472 (BOC) 659-5566 (PBOC) Cell 907-748-2118 Harmony 758-4404 GPB Pager 907-659-5272 # 1890 a ko p s ecce o ctl (a7 b p. CO m Alternate; Kellie Okonek Hunt, Jennifer L (DOA From: AK, OPS PCC EOC TL (AKOPSPCCEOCTL@bp.comj Sent: Wednesday, September 25, 2013 10:49 PM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale 0; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; AK, HSSEE Env Adv West; AK, OPS GC3 Facility & Field OTL; AK, OPS GC3&PCC OSM; AK, OPS FS3 OSM; AK, OPS FS3 Facility OTL; Burgess, David H; AK, HSSEE Env Adv East; AK, OPS PCC EOC TL; AK, OPS FS2 OSM; AK, OPS FS2 Facility OTL Subject: Gas flaring events at GC1, MOWS2, FS3 To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC j_ennifer huntna.alaska.gov dave roby(o)alaska.gov victoria.ferquson(o)alaska.gov From: Kellie Okonek, GPB Production Optimization Team Leader A flaring event occurred at FS2 starting at 09/24/2013 01:00 and stopping at 09/24/2013 03:00 with a volume of 214 (MSCF). The event lasted for 120 minutes, and was due to depressurization of 9A commonline for repairs. Flaring stopped when line depressured. A flaring event occurred at FS2 starting at 09/23/2013 20:30 and stopping at 09/23/2013 23:30 with a volume of 479 (MSCF). The event lasted for 180 minutes, and was due to DS9E commonline coming down to swap blinds. A flaring event occurred at FS3 starting at 09/22/2013 14:20 and stopping at 09/22/2013 15:40 with a volume of 60 (MSCF). The event lasted for 80 minutes, and was due to depressurization of 6D commonline to install a pig launcher. Flaring stopped when line depressured. A flaring event occurred at GCI starting at 09/18/2013 02:20 and stopping at 09/18/2013 15:00 with a volume of 220 (MSCF). The event lasted for 760 minutes, and was due to scheduled water wash on K7001. A flaring event occurred at GC3 starting at 09/18/2013 00:01 and stopping at 09/18/2013 02:00 with a volume of 413 (MSCF). The event lasted for 119 minutes, and was due to wet gas compressor shutdown due to control/instrumentation failure. Flaring stopped when WOA production was decreased. A flaring event occurred at GC3 starting at 09/17/2013 20:02 and stopping at 09/18/2013 with a volume of 826 (MSCF). The event lasted for 238 minutes, and was due to wet gas compressor shutdown due to control/instrumentation failure. Flaring stopped when WOA production was decreased. A flaring event occurred at FS3 starting at 09/17/2013 14:14 and stopping at 09/17/2013 15:51 with a volume of 74 (MSCF). The event lasted for 97 minutes, and was due to depressurization of 6B for the make-piggable project. A flaring event occurred at GC1 starting at 09/16/2013 03:00 and stopping at 09/16/2013 22:30 with a volume of 6070 (MSCF). The event lasted for 1170 minutes. The event had a volume greater than 5000 (MSCF) and was due to depressurization of GT -13 in support of line lifts for inspection. Please let me know if you have any questions. Kellie Okonek (alt. Travis Rybicki) PCCIEOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akopspcceoctl(a)bp com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000033 2. Facility Name PBU GC 3 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition October -2013 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 7,500 10. Pilot and Purge 13,805 11. Assist Gas 0 12. Fuel gas used in lease operations. 511,936 13. Other (see instructions) 0 OfBclal Use Only Authorization>1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 533,241 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas Q Waste: MCF 17. Transferred from: 0 Commissioner Date 18. Transferred to: (Express as a negative #) CGF -25,108,541 19, Remarks: I hereby certify that th oregoing is true and c rrect to the best of my knowledge. n M&/1 Note: All volumes must be corrected Signature_ JJ Title Mana er Production Taxes and Ro Ities Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 DatedIAL AAC25.235. VL F �/3/)4- Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate Flare Start Date 10/01/2013 Flare End Date 10/31/2013 GC3 Flare Report Total Volume (MSCF) 7500 Report Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 13-531 Controlled Slowdown 10/15/2013 9:30:00 am 11:00:00 am 90 min Yes No Yes BP1\JOHNSOM 7500 Determination Cause LPS Slug catcher V-7002 shut down and de -pressure for maintenance on drain header. Action Taken WOA reduced production rales and shut-in production to v-7002 for de -pressuring and maintenance. Daily Volume (MSCF) 7500 Total Volume (MSCF) 7500 Generated 11/04/2013 3:38:24PM Page 13 of 13 Hunt Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com) Sent: Tuesday, October 15, 2013 10:56 AM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, OPS GC3 Facility & Field OTL; AK, OPS GC3&PCC OSM; AK, HSSEE Env A v West Subject: Gas flaring event at To: Jennifer Hunt, AOGCC iennifer.hunt@alaska.gov CC: Dave Roby, AOGCC dave roby(a)alaska.gov From: Travis Rybicki, GPB Production Optimization Team Leader CC: Victoria Ferguson, AOGCC victoria fergusonp_alaska.gov A flaring event occurred at GC3 starting at 10/15/2013 09:30 and stopping at 10/15/2013 11:00 with a volume of 7500 (MSCF). The event lasted for 90 minutes. Flaring occurred during the planned shut down and depressuring of A Bank LPS Slug Catcher for planned maintenance activities. Production rates were decreased to the GC3 facility. Flaring ended when the vessel/system was depressured, prepared for maintenance and the flare valves closed. Please let me know if you have any questions. Travis M. Rybicki PCC.EOC (Production optimization) Team Lead Office 907-659-4472 (BOC) 659-5566 (PBOC) Cell 907-748-2118 Harmony 758-4404 GPB Pager 907-659-5272 # 1890 akopsocceoctl(a)bp Com Alternate: Kellie Okonek STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000033 2. Facility Name PBU GC 3 3. Field PBU - WOA 4. Operator I BP 5. Monthfyear of Disposition November -2013 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold O Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 1 9. Flared or vented more than 1 hour (see instr.) 1,254 10. Pilot and Purge 16,163 11. Assist Gas 0 12. Fuel gas used in lease operations. 498,284 13. Other (see instructions) p Official Use Only Authorization >1 hr. Safety � Z TA IT MCF 14. TOTAL VOLUME (ITEMS 6-12) 515,702 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 1 0 Waste: MCF 17. Transferred from: 6 r Cmissioner Date 18. Transferred to: (Express as a negative #) CGF -25,144,023 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature Mao / ' a / n Note: All volumes must be corrected Title Mana er Production Taxes and Ro allies Alaska to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date dgLb AAC25.235. VZ- F- 6 /3/1q - Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate Flare Start Date 11/01/2013 Flare End Date 11/30/2013 GC3 Flare Report Total Volume (MSCF) 1255 Report Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 13-553 Flare Relief 11/01/2013 6:00:00 pm 12:00:00 am 360 min No No No BP1\HAWKJ5 1075 Determination Cause Wet Gas compressor shutdown because of control/instrumentation failure associated with a faulty suction pressure instrument PI -03-55138. Action Taken Equipmentwas restarted at 0100 hours on 11/2/2013 after the instrument was replaced. 13-554 Flare Relief 11/02/2013 12:0000 am 10000 am 60 min No No No BP1\HAWKJ5 179 Determination Cause Wet Gas compressor shutdown because of control/instrumentation failure associated with a faulty suction pressure instrument PI -03-5513B Action Taken Equipmentwas restarted at0100 hours afterthe pressure instrumentwas replaced. 13-578 Flare Relief 11/28/2013 3:00:00 pm 4:00:00 pm 60 min No No Yes BP1\HOLLLB 1 Determination Cause Depressured C' S/C for scheduled work. Action Taken Depressurization complete. Total Volume (MSCF) 1255 Generated 12/02/2013 1:44:10PM Page 8 of 8 Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Tuesday, November 12, 2013 8:22 AM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, OPS GC3 Facility & Field OTL; AK, OPS GC3&PCC OSM; AK, HSSEE Env Adv West Subject: Gas flaring events a To: Jennifer Hunt, AOGCC iennifer.hunt(a)alaska.gov CC: Dave Roby, AOGCC dave.robv(a alaska.goy From: Travis Rybicki, GPB Production Optimization Team Leader CC: Victoria Ferguson, AOGCC victoria ferguson( alaska.gov A flaring event occurred at GC3 starting at 11/01/2013 18:00 and stopping at 11/01/2013 24:00 with a volume of 1075 (MSCF). The event lasted for 360 minutes. Flaring occurred during the unplanned shut down of the K5500 Wet Gas compressor due to a control instrumentation failure. Flaring continued while troubleshooting and subsequent repair of the failed instrument occurred. Flaring continued into the following day. A flaring event occurred at GC3 starting at 11/02/2013 00:00 and stopping at 11/02/2013 01:00 with a volume of 179 (MSCF). The event lasted for 60 minutes. Flaring occurred during the unplanned shut down of the K5500 Wet Gas compressor due to a control instrumentation failure. Flaring continued while troubleshooting and subsequent repair of the failed instrument occurred. Flaring ended when the failed instrument was replaced, K5500 was restarted and loaded and the flare valves closed. Please let me know if you have any questions. Travis M. Rybicki PCC-EOC (Production Optimization) Team Lead Office 907-659-4472 (BOC) 659-5566 (PBOC) Cell 907-748-2118 Harmony 758-4404 GPB Pager 907-659-5272 # 1890 akoospcceoctlC�bp. com Alternate: Kellie Okonek STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000033 2. Facility Name P13 GC 3 3. Field PBU - WOA 4. Operator BP 5. Month/Year of Disposition December -2013 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold Q Pool Name PoolCode Percent 7. Reinjected Q 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 15,218 10. Pilot and Purge 15,894 11. Assist Gas 0 12. Fuel gas used in lease operations. 518,422 13. Other (see instructions) Q Official Use Only Authorization >1 hr: Safety 2 [ /� � MCF 14. TOTAL VOLUME (ITEMS 6-12) 549,534 Lease Use MCF 15. NGL Gas Equivalent Q Conservation MCF 16. Purchased gas Q Waste: MCF 17. Transferred from: Q t` 18. Transferred to: (Express as a negative #) CGF -25,818,644 Commissioner Date 19. Remarks: I hereby certify that th foregoing is true and correct to the best of my knowledge. Signature t+" r ^ Title Manager Production Taxes and Rgyalties Alaska Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Diane ColleyPhone (907) 564-5775 Date Ilalq V[ -r rola/[¢ Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT -GC -3 GAS FLARING INCIDENT REPORT December 2013 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr TOTAL 0 Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 12/6/2013 0648-1100 13,650 See Attachments See Attachments 12/23/2013 0100-0945 1,568 TOTAL 15,218 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DESCRIPTION OF INCIDENT & CAUSE See Attachments TOTAL 0 Planned Events Exceeding 1 Hour OR > 5,000 mcf See Attachments TOTAL 0 & CAUSE See Attachments ACTION TAKEN TO E See Attachments Page 9 1/12/2014 10:27 AM TOTAL Unplanned Events < 1 Hour 0 Unplanned Events > 1 Hour 15,218 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 15,894 Assist 0 TOTAL FLARED VOLUME 31,112 & CAUSE See Attachments ACTION TAKEN TO E See Attachments Page 9 1/12/2014 10:27 AM Flare Start Date 12/01/2013 Flare End Date 12/31/2013 GC3 Flare Report Total Volume (MSCF) 15218 Report Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 13-583 Flare Relief 12/06/2013 6:48:00 am 11:00:OOam 252min No No No BPI\JOHNSOM 13650 Determination Cause V-3018 HP seperator shutdown because of a problem associated with leaking drain flange. Action Taken WOA stopped production rates to V-301 B, flaring continued until maintenance could get flange tightened and leak fixed. 13-595 Flare Relief 12/23/2013 1:00:00 am 9:45:00 am 525 min Yes No No BP1 WAWK15 1568 Determination Cause PCM 144 card failure caused "Plant Stop Production" shutdown. LP gas flared only during statup period Action Taken Restarted K-5500 LP Gas Compressor, Total Volume (MSCF) 15218 Generated 01/06/2014 9:50:43AM Page 8 of 8 Hunt Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Tuesday, December 10, 2013 11:46 AM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, OPS GC3 Facility & Field OTL, AK, OPS GC3&PCC OSM; AK, HSSEE Env Adv West Subject: Gas flaring event atm To: Jennifer Hunt, AOGCC Jennifer hunt(cDalaska.00v CC: Dave Roby, AOGCC dave.robvna alaska.pov From: Travis Rybicki, GPB Production Optimization Team Leader CC: Victoria Ferguson, AOGCC victoria ferouson(cDalaska.gov A flaring event occurred at GC3 starting at 12/06/2013 06:48 and stopping at 12/06/2013 11:00 with a volume of 13650 (MSCF). The event lasted for 252 minutes. Flaring occurred during the repair to a leaking drain flange on HP Separator V-301 B. Production to V-301 B was stopped/re-routed while repairs were made. V-301 B was routed to flare system as part of energy isolation to effect repair to leaking flange. Flaring ended when the repair was make (flange tightened) and the leak stopped. Please let me know if you have any questions. Travis M. Rybicki PCC-EOC (Production Optimization) Team Lead Office 907-659-4472 (BOC) 659-5566 (PBOC) Cell 907-748-2118 Harmony 758-4404 GPB Pager 907-659-5272 # 1890 a k o ps pcce o ctl (a7. b O. CO m Alternate: Kellie Okonek Hunt Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Tuesday, January 07, 2014 7:43 AM To: Cc: Hunt, Jennifer L (DOA) Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, OPS GC3 Facility & Field OTL; AK, OPS GC3&PCC OSM; AK, HSSEE Env Adv West Subject: Gas flaring event at GC3 To: Jennifer Hunt, AOGCC iennifer hunt(aalaska.gov CC: Dave Roby, AOGCC dave roby(aalaska.aov From: Travis Rybicki. GPB Production Optimization Team Leader CC: Victoria Ferguson, AOGCC victoria ferauson(a alaska.00v A flaring event occurred at GC3 starting at 12/23/2013 01:00 and stopping at 12/23/2013 09:45 with a volume of 1568 (MSCF). The intermittent event lasted for 525 minutes. Flaring occurred during the unplanned shutdown of the GC3 facility related to a PCM card failure. Flaring continued during the troubleshooting and restart period for GC3. Flaring ended when the facility was restarted and flare valves closed. Please let me know if you have any questions. Travis M. Rybicki PCC-EOC (Production Optimization) Team Lead Office 907-659-4472 (BOC) 659-5566 (PBOC) Cell 907-748-2118 Harmony 758-4404 GPB Pager 907-659-5272 # 1890 akopspcceoctlCcDbp Com Alternate: Kellie Okonek