FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000033
2. Facility Name
PBU GC 3
3. Field
PBU - WOA
4. Operator
BP
5. MonthlYear of Disposition
I January -2013
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
846
10. Pilot and Purge
17,816
11. Assist Gas
0
12. Fuel gas used in lease operations.
513,275
13. Other (see instructions)
6
Official Use Only�
Authorization >7 hr
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
531,937
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
`1 / n
18. Transferred to: (Express as a negative #) CGF
-25,445,337
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
/'�///n�Y�n//�n///�f /n Note: All volumes must be corrected
Signature M! f Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 Asia and to a
�J 2 temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date �, J(} ✓ AAC25.235.
!/L F
3/zq/13
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
FITTIV
Fon 114
1/20/2013
TIME
TOTAL
TOTAL
TOTAL
1715-2130
TOTAL
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -3
GAS FLARING INCIDENT REPORT
January 2013
Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
I
DESCRIPTION OF INCIDENT & CAUSE
See Attachments
n
See Attachments
0
846 See Attachments
846
TOTAL
0
0
0
846
17,816
0
18,662
See Attachments
See Attachments
ACTION TAKEN TO ELIMINATE
See Attachments
Page 8
2/13/2013
3:46 PM
Flare Start Date 01/01/2013
Flare End Date 01/31/2013
GC3 Flare Report
Total Volume (MSCF) 846
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
13-34 Flare Relief 01/20/2013 5:15:00 pm 9:30:00 pm 255 min No No Yes BPl WAWKJ5 845
Determination Cause Depressured the"A"LDF line and"C" Slugcatcherto the flare in orderto remove energy from the"XLDF fortagout.(Repairs are needed to
the"A"LDF due to corrosion issues.)
Action Taken When the "A" LDF line reached zero energy (no pressure). the deoressurino of the line was discontinued.
Total Volume (MSCF) 846
Generated 02/04/2013 3:54:59PM Page 10 of 10
McMains Stephen E (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj
Sent: Friday, February 01, 2013 8:10 AM
To: McMains, Stephen E (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; Kruger, Dale O; AK, OPS GC3 Facility & Field OTL; AK, OPS GC3&PCC
OSM; AK, HSSEE Env Adv West
Subject: Gas flaring event at GC3
To: Steve McMains, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson,
AOGCC
Steve mcmains(o)alaska.gov dave.roby(a alaska.gov
victoria.ferq uson (d,)alaska. gov
From: Travis Rybicki, GPB Production Optimization Team Leader
A flaring event occurred at GC3 starting at 01/20/2013 17:15 and stopping at 01/20/2013 21:30 with a volume of 846
(MSCF). The event lasted for 255 minutes. Flaring was due to the planned depressurization of the A Pad LDF (large
diameter flowline) via the C Bank LPS Slugcatcher to perform energy isolation activities for the LDF in preparation for
planned work on the LDF. Flaring ended when the depressuring activities on A LDF were completed and the flare valves
were closed.
Please let me know if you have any questions.
Travis M. Rybicki
PCC-EOC (Production Optimization) Team Lead
Office 907-659-4472 (BOC) 659-5566 (PBOC)
Cell 907-748-2118 Harmony 758-4404
GPB Pager 907-659-5272 # 1890
akoosocceoctl(o bp..com
Alternate: Kellie Okonek
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name
0290000033 PBU GC 3
Disposition
3. Field
PBU - WOA
Volume MCF
4. Operator 5. MonthlVear of Disposition
BP I February -2013
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Pool Name Pool Code Percent
7. Reinjected
0
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
16,400
11. Assist Gas
0
12. Fuel gas used in lease operations.
472,376
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
488,776
Lease Use
MCF
15, NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
O
Waste:
MCF
17. Transferred from:
U
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-23,692,825
19. Remarks:
I hereby certify that the aforegoing is true and correct to the best of my knowledge.
J4Note: All volumes must be corrected
Signature Title Manager Production Taxes an Ro @ Ities Alaska to pressure of 14.65 psia and to a
Printed Name Diane Colley Phone (907) 564-5775 Date /✓ temperature of 60o F. Authority 20AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -3
GAS FLARING INCIDENT REPORT
February 2013
Events less than or equal to 1
Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 0
See Attachments See Attachments
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
Planned Events Exceeding 1 Hour OR> 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events > 1 Hour
0
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
16,400
Assist
0
TOTAL FLARED VOLUME 16,400
Page 8
3/13/2013
9:52 AM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000033
2. Facility Name
PBU GC 3
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
March -2013
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Pool Name Pool Code Percent
7. Reinjected
0
B. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
16,918
11. Assist Gas
0
12. Fuel gas used in lease operations.
524,149
13. Other (see instructions)
D
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
541,067
Lease Use
MCF
15. NGL Gas Equivalent
U
Conservation
MCF
16. Purchased gas
U
Waste:
MCF
17. Transferred from:
0
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-26,198,561
19. Remarks:
I hereby certify that the fo oing is true and correct to the best of my knowledge.
�nj Note: All volumes must be Corrected
Signature _ U Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
h temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date V AAC25.235.
Form 10-422 Rev. W009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -3
GAS FLARING INCIDENT REPORT
March 2013
Not required for unplanned events <=1 hr
TOTAL 0
See Attachments
TOTAL 0
or Equal 1 Hour AND <=
See Attachments
TOTAL 0
See Attachments
TOTAL 0
Not required for unplanned events <= 1 hr
See Attachments
See Attachments
See Attachments
Page 8
4/10/2013
1:30 PM
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events > 1 Hour
0
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
16,918
Assist
0
TOTAL FLARED VOLUME
16,918
Not required for unplanned events <= 1 hr
See Attachments
See Attachments
See Attachments
Page 8
4/10/2013
1:30 PM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000033
2. Facility Name
PEI GC 3
3. Field
--TBP
PBU - WOA
BP
5. MonthNear of Disposition
A r 1-2013
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
8. Flared or vented 1 hour or less
10
9. Flared or vented mom than 1 hour (see instr.)
0
10. Pilot and Purge
10,798
11. Assist Gas
0
12. Fuel gas used in lease operations.
458,540
13. Other (see instructions)
0
Official Use Only
Authorization >i hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
469,348
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
18. Transferred to: (Express as a negative #) CGF
-24,663,973
Commissioner Date
19. Remarks:
I hereby certify that th regoing is trug and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Manager Production Taxes and Ro Ities Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date14-A AAC25.235.
Form 10422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT -GC -3
GAS FLARING INCIDENT REPORT Page 10
April 2013
jUnplanned Events less than or equal to 1 hour
ri
DATE TIME VOLUME. DESCRIPTION OF INCIDENT &CAUSE ACTION TAKEN TO ELIMINATE CAUSE
4/22/2013 0500-0520 10 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 10
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT &CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
5/14/2013
10:22 AM
See Attachments See Attachments
TOTAL
0
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL
0
TOTAL
Unplanned Events < 1 Hour
10
Unplanned Events> 1 Hour
0
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
10,798
Assist
0
TOTAL FLARED VOLUME
10,808
5/14/2013
10:22 AM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000033
2. Facility Name
PBU GC 3
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
I May -2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume,
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
16,925
10. Pilot and Purge
14,626
11. Assist Gas
0
12. Fuel gas used in lease operations.
500,308
13. Other (see instructions)
0
Official Use Only
Authorization >i hr:
Safety
cIZ.
MCF
14. TOTAL VOLUME (ITEMS 6.12)
531,859
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
/ —3 /
le
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-25,076,043
19. Remarks:
I hereby certify that the oregoing is true and correctto the best of my knowledge.
Note: All volumes must be corrected
Signature Title Manager Production Taxes and Ro alties Alaska to pressure Of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT -GC -3
GAS FLARING INCIDENT REPORT
May 2013
Not required for unplanned events <= 1 hr
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr
TOTAL 0
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL
TOTAL
5/11/2013 0300-1830
5/17/2013 0715-0915
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
See Attachments
Al
See Attachments
O
16,146 See Attachments
779
16,925
TOTAL
0
0
0
16,925
14,626
0
31,551
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
See Attachments
Page 11
6/13/2013
2:28 PM
Flare Start Date 05/01/2013
Flare End Date 05/31/2013
GC3 Flare Report Total Volume (MSCF) 16925
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
13-246 Flare Relief 05/11/2013 3:00:00 am 6:30:00 pm 930 min No No Yes BP1\VAUGHNM 16146
Determination Cause Depressured GHX line from GC -1 to GC -3 for pig launcher installation. Also depressured test bank and C -Slug Catcher
Action Taken EgJob complete and system back to normal.
13-262 Flare Relief 05/17/2013 7:15:00 am 9:15:00 am 120 min Yes No Yes BP1\MOORDV 779
Determination Cause Depressurizing Annex tie -line for pigging.
Action Taken No response taken as this was deemed to be of short duration.
Total Volume (MSCF) 16925
Generated 06/10/2013 9:22:50AM Page 14 of 14
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj
Sent: Tuesday, May 14, 2013 1:35 PM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; Kruger, Dale O; AK, HSSEE Env Adv West; AK, OPS FS1 Facility OTL; AK,
OPS FSI OSM; Burgess, David H; AK, HSSEE Env Adv East; AK, OPS FS3 OSM; AK, OPS
FS3 Facility OTL
Subject: Gas flaring events at GC3, FS3, and FS1
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
a ennifer.hunt@alaska.gov dave.robv@alaska.eo_v victoria ferguson@alaska.gov
From: Kellie Okonek, GPB Production Optimization Team Leader
A flaring event occurred at FS1 starting at 05/10/2013 20:35 and stopping at 05/10/2013 23:58 with a volume
of 987 (MSCF). The event lasted for 203 minutes and was due to shutdown of 1802 T/C due to a problem
associated with oil pressure. Flaring stopped when the compressor was re -loaded.
A flaring event occurred at FS3 starting at 05/11/2013 13:02 and stopping at 05/11/2013 14:36 with a volume
of 70 (MSCF). The event lasted for 94 minutes.
at FS3 starting at 05/11/2013 01:05 and stopping at 05/11/2013 03:00 with a volume of 40 (MSCF). The event
lasted for 115 minutes and was due to spin cooling of 1803 LPS compressor for water wash. Flaring stopped
when cooling complete.
A flaring event occurred at FS3 starting at 05/13/2013 01:15 and stopping at 05/13/2013 03:15 with a volume
of 40 (MSCF). The event lasted for 120 minutes and was due to spin cooling of 1804 LPS compressor for water
wash. Flaring stopped when cooling complete.
A flaring event occurred at GC3 starting at 05/11/2013 03:00 and stopping at 05/11/2013 18:30 with a volume
of 16146 (MSCF). The event lasted for 930 minutes. The event had a volume greater than 5000 (MSCF) and
was due to depressurization of the GHX line for planned pigging activities. Flaring stopped when the line was
depressured.
Please let me know if you have any questions.
Thanks,
Kellie Okonek (alt. Travis Rybicki)
PCCIEOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 382 1370 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akopspcceoctICcDbp com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1, Facility Number
0290000033
2. Faciliry Name
PB GC 3
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
June -2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
8. Flared or vented 1 hour or less
208
9. Flared or vented more than 1 hour (see instr.)
2,551
10. Pilot and Purge
7,933
11. Assist Gas
0
12. Fuel gas used in lease operations.
96,091
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr'.
Safety
�2 � T
MCF
14. TOTAL VOLUME (ITEMS 6-12)
106,783
Lease Use
MCF
15, NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
n
J
18. Transferred to: (Express as a negative #) CGF
-5,906,523
Commissioner Date
19, Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature. Title Manager Production Taxes and Royalties Alaska
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.
Printed Name Diane Colley Phone (907) 564-5775 Date
b/L-F-
4 fJ1 -3113
J-1/13113
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
6/29/2013
TOTAL
2109-2210
TOTAL
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -3
GAS FLARING INCIDENT REPORT
June 2013
Not required for unplanned events <= 1 hr
0
551 See Attachments
551
& CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr
ACTION TAKEN TO E
See Attachments
6/5/2013 2055-2105
208 See Attachments See Attachments
TOTAL
208
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
6/7/2013 0005-0900
2,000 See Attachments See Attachments
TOTAL
2,000
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events > 1 Hour
551
Planned Events < 1 hour and not
208
exceeding 5,000 MCF
Planned Events > 1 hour or
2,000
exceeding 5,000 MCF
Pilot Purge
7,933
Assist
0
TOTAL FLARED VOLUME
10,692
Page 8
7/16/2013
11:26 AM
Flare Start Date 06101/2013
Flare End Date O6/30/2013
GC3 Flare Report Total Volume (MSCF) 2759
Report
Numbs System
Date StartTime Stop Time Duration Intermittent Black Smoke Planned
Reported By Volume
13-294 Flare Relief 06/05/2013 8:55:00 pm 9:05:00 pm 10 min No No Yes
BP1tPRESD3 208
Determination Cause
Sk 40 Open 611 and add assist gas to bum residuals out of bum pit line, dp
Action Taken
Remove assist gas and Gose 611, return to normal. dp
13-296 Flare Relief 06/07/2013 12:05:00 am 9:00:00 am 535 min No No Yes
BPIIHAWKJS 2000
Determination Cause
Depressured the plant for scheduled TAR.
Action Taken
Bled down pressure to zero state as needed for the shutdown. Bled down pressure from LDFs, HP Separators, and Slug Catchers.
13-340 Flare Relief 06/29/2013 7:09:00 pm 8:10:00 pm 61 min Yes No No
BP1tPRESD3 551
Determination Cause
Lost LPS compressor due to thermocouple deviations and V4 recycle valve VP falu e.
Action Taken
Cut production and started Compressor after Repairs were made.
Total Volume (MSCF) 2759
Generated 07/09/2013 4:10:03PM Page 10 of 10
salnu!w
077E J01 palsel Juana agl'(dOSW) Olo awnlon a ql!m £LOZ/OL/901e 6u!ddo;s pue 0000 £LOZ/60/90 le 6ullJels L00 le
salnup
077L Jo; palsel Juana aqi '(jOSIN) O to awnlon a qpm £ LOZ/L L/901e 6u!ddols pue 0000 £LOZ/OL/901e 6uluels LOO Je
-sa;nww
077E J01 palsel;uana agl'(dOSIN) Olo awnlon a ql!m £LOZ/LL/901e 6u!ddols pue 0000 £LOZ/OL/90;e 6URRIS LOOle
salnup
0717L Jol Palse! Juana aqi '(dOSIN) O to awnlon a qJ!m £LOZ/ZL/901e 6u!ddo;s pue 0000 £LOZ/L L/901e 6u!lJels LOO le
salnww
077E Jo; palsel Juana agJ '(jOSIN) O;o awnlon a ql!m £ LOZ/£ L/90 le 6u!ddols pue 0000 £ LOZ/Z L/90 le 6u!lJels LOJ le
salnu!w
077E Jo; palsel;uana agl'(dOSW) Olo awnlon a ql!m £LOZ/7L/901e 6u!ddols pue 0000 £LOZ/£L/901e 6u!1Je1s LOO;e
pann000 6uueq ou 1egJ JJoddns aJo;aJag1 pue Jlep ag1 Jo; 6!sd 0 pamogs sJoleo!pu! aJnssaJd Japeaq aJell
aqi Ja1aw loaJJooui ue;o llnsaJ aqi aq o; poolsJapun Jagaq mou aJe go!gm ' LOJ le panssi aJam slJodaJ 6uueg snolnaJd
ao!nJas of pauJn;a O/1 aq;
pue peoe!daJ seen pJeo agl uagm paddols 6uueld pjeo uoilejq!A pale; a eoeldaj of aoueue;u!ew pauueld Jol g09 L 011 to
umop;ngs of anp seen pue '(dOSW) 0009 ueq; Jaleak awnlon a peg Juana aqi -salnu!w 96 Jo; passel Juana agJ '(dOSW)
0L7ZL to awnlon a ql!m 0L:OZ £LOZ/ZO/90;e 6u!ddols pue Z£:gL £LOZ/ZO/90;e 6ulpels dOO le paJJn000;uana 6uueg V
paz!lpels suoijaiado Ll!I!oel
pue papeol-aJ sem JossaJdwoo agl pue alaldwoo seen 6u!loogsalgnoJl uegm paddols 6u!Jeld umopings JossaJdwoo
IIN 998E of anp seen pue '(jOSIN) 0009 ueql Ja;e9J6 awnlon a peq Juana aqi sa;nup 86 Jo; passel Juana aqi '(JOSW)
8L9LL to awnlon a qJ!M OL 7L £LOZ/LO/90le 6u!ddo;s pue Zq:OL £LOZ/LO/90;8 6ulJJe1s dOO le paJJn000 Juana 6u!Jeg V
a;aldwoo sem uogezunsseidep uagM paddols 6uueld vo!lelos! u!eJl-8 pauueld a Jo; lueld aq; to uo!;ez!JnssaJdap
o; anp sem pue (dOSW) 0009 uegl Ja1eaJ6 awnlon a peg Juana agJ salnuu 00£ Jol pa;sel Juana agJ '(dOSW)
97gg;o awnlon a g;!M OO:ZL £LOZ/L0/90le 6ulddols pue 0010 £LOZ/LO/90 le 6u!JJe;s ZSd le paJJn000;uana 6u!Je0 V
Japeal weal uo!lez!w!ld0 uo!lonpoJd BdJ VuM aQ!aN :woJd
AOb eJ sele uosn Ja; e!Jolo!n no e�se!e goranep
OOJOV 'uosn6Jad e!J0101n :00 OOJOV 'AgoN aneO 00
no esele lunq Ja;!uua.
OOJOV 'lunH Ja;!uuaf :oi
LSd tWe' LOJ 'dJO 'ZSd le sluana 6u!Jel; seO :Joa[gnS
ll0 Al!I!oed LSd SdO 'NV ASO LSd SdO 'NV
110 P191d'8 41!0ed £OJ SdO 'NV 'WSO 00d'8£OO SdO 'NV'leJ1u90 APV nu3 33SSH 'NV
'lsaM APV Au3 33SSH 'NV'll0 Al!I!oed ZSd SdO 'NV ASO ZSd SdO 'NV ASO M SdO
'NV 'll 003 00d SdO 'NV 'f w!oO 'uepJo!a,0 Ilio Al!I!oed 100 SdO 'NV'WSO J00 dOO
SdO 'NV 'll0 d00 SdO 'NV'H P!ne4 'ssa6Jnq 'lss3 APV Au3 33SSH 'NV !ko6aJ0 'Jng1JV
'V AJeO 'uosuag'eJpuefalV 'ouelse0 '(VOQ) S p!nea 'Rgoa'(VOQ) l euo;o!n 'uosn6Jad :30
(VO(]) l Ja;!uuar ';unH :ol
Wd L L:£ £ LOZ 'g0 aunp 'AepJnleS :JUGS
[woo'dq@ll003OOdSdOAV1 ll 003 OOd SdO 'NV :wojd
voa) l as;[uuar ;unH
at GC1 starting at 05/08/2013 00:01 and stopping at 05/09/2013 with a volume of 0 (MSCF). The event lasted for 1439
minutes.
A flaring event occurred at GC3 starting at 06/07/2013 00:05 and stopping at 06/07/2013 09:00 with a volume of 2000
(MSCF). The event lasted for 535 minutes and was due to depressurization of the plant for planned TAR. Flaring stopped
when depressurization complete.
A flaring event occurred at FS1 starting at 06/01/2013 13:30 and stopping at 06/01/2013 16:00 with a volume of 834
(MSCF). The event lasted for 150 minutes and was due to shutdown of STV/IP 1802 compressor due to fuel gas knockout
drum high level. Flaring stopped when the compressor was re-loaded.
Please let me know if you have any questions.
Kellie Okonek (alt. Travis Rybicki)
PCC/EOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 382 1370 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akopspcceocti(ilbp.com
woo-cjqgljoo@oodscI0Nff l!ew-a
WNW ssaooe - V03) 0696 Jo (9EZ4 # ssaooe -VON)) 4L9 Ja6ed
4044 99L :AuowaeH OLE 1, Z9£ (L06) :1193
(009d) 9999 / (009) ZL44 699 (L06) :lewaIXG
ll uopez!w13d0 uol;3np0ad 0O3100d
(!�o!gAH s!Mi ';le) iGUOMO 01I10)1
suo!lsanb Rue aneq noR l! mop aw;al aseald
painssajdap mann su!e4 HO dH aq; uagm paddo;s 6uueld 'Niom punaeuwn; u!ej;-V X01
wnj(] gseld J91eWi-V'8 dl -V 'dH-8 'dH-V 10 uogezunssaadap o; anp sena pue sa;nuiw 696 sol pa;sel;uana aqi '(dOSW)
6Z6 10 awnlon a q;!m £0:170 £LOZ/O£/901e 6u!ddo;s pue 4900 £LOZ/0£/90 le 6u!je;s ZS3;e pajin000;uana 6uuejl V
J9n!909a pue jagounel 6!d
to lenowaJ Jo; s9u!!u0ww00 O-ZL pue 8-ZL to u01;ezunssaidep o; anp sem pue salnu!w 006 Jo; pa;se!;uana agi'(dOSW)
Egg to awnlon a gl!m 0£: L L £1,0Z/LO/LO le 6u!ddols pue 09:60 £LOZ/LO/LO le 6u!ue;s LSd le pa.un000;uana 6uueg V
a;aldwoo ainssajdap uagm paddols
6uueld aoueua;u!ew pauueld iol Z LS(]to uo!lezunssaidep o; anp sem pue selnu!w gZZ jol palsel;uana aql '(dOSW)
Egg to awnlon a g;!m OZ:OZ £LOZ/60/LO le 6u!ddo;s pue g£:9L £LOZ/LO/LO le 6u!>Je;s 6Sd le paim000;uana 6uueg V
papeol sem iossaidwoo Zogl a;ewe;le ag; uagm paddols 6wjeld sdwe;
lua!gwe q6!q o; anp jossaidwoo dl/AAS L09 L aq; l0 6u!peolun o; anp sem pue salnu!w gg sol passel;uana aqi '(dOSIN)
179910 awnlon a q;!m gZ:LO £LOZ/9Z/901e 6u!ddo;s pue LO 00 £LOZ/9Z/901e 6u!;,els LSd;e pajin000;uana 6uuell V
'papeol sem jossaidwoo Log a;euiale aq; uagm paddo;s 6uueld sdwa;
lua!gwe q6!q o; anp iossaidwoo dl//U S ZO9L aql l0 6u!peolun o; anp sem pue salnu!w g17L jol pa;sel;uana aqi '(dOSW)
170910 awn JOA a q;!m 00:£Z £LOZ/LZ/901e 6uiddols pue 9£:OZ £LOZ/LZ/9018 6u!ye;s LSd le pajin000;uana 6uue9 V
alaldwoo smedaj jaue papeol-ai lossaidwoo pue pa!euno sem uoponpad uagm paddols 6uueld aml!el d/l amen apROaj
t?A pue su0!;eIA9P aldn000wjaq; o; anp p/s jossaidwoo Sd1 0; anp sem pue sa;nu!w L9101 pa;sej;uana aql '(dOSW)
L9910 awnlon a q;!m OL:OZ £LOZ/6Z/90;e bu!ddols PUB 60:6L £LOZ/6Z/90le bu!pe;s £OO;e pawn000;uana 6uueg V
alaldwoo
clmJe;s uagm paddols 6uueld dnpe;s 00££>i LIE) 6uunp 6uuell o; anp sem pue sa;nu!w 01717L lol passel;uana aql
(dOSW) 0410 awnlon a q;!m £LOZ/90/LO le 6u!ddo;s pue 00:00 £LOZ/90/Lo le bu!>aels [OE) le paun000;uana 6uueg V
umop loon jol snddoo to u!ds pue o00L->I jol;sal do -;,els o; anp sem pue sa;nu!w £L sol pa;sel;uana aqi '(dc)SW)
O1, to awnlon a Qm 0L:66 £LOZ/6Z/9018 6u!ddo;s pue L9:LL £LOZ/6Z/90le 6u!pe;s LOO ;e pajm000;uana 6uueg V
9191dwoo sem uo!;ezunssaidep uagm paddols 6u!ae d papeol sem
1V 618 V03 uagm jossaidwoo il0 meds to uo!lezunssajdap o; anp sem pue sa;nu!w go 1, sol palsel;uana aqi '(dOSW)
06£ to awnlon a q;!m 9L:91, £LOZ/9Z/901e buiddo;s pue 0£:9L £ LOZ/9Z/901e 6u!;Jels LOJ;e pajin000;uana 6uue9 V
japeal weal uogez!wgdO uogonpad 8d9 VuoM0 a!ga>{ :wad
AOIJ eMsele uosn mal euolo!n AM else a goranep Ao eMse!e ;ung jal!uua.
00J0V 'uosn6jad euol3!n :00 OOJOV 'Ago21 ane(] :00 OOE)OV 'lunH Jal!uu9r :off,
ZSd '1,s=1 '£OJ ' L0O le s;uana 6uueg se0 :43efgng
0 ale(] 'ja6nA>i'liO Al!l13ed LSd Sd0 '>IV
'INSO LSA Sd0 1HV11i0 Pla!d 8 A1!I!3ed £OJ Sd0 'NV ASO 00d'8£0J SBO NV ISS
APV Au3 33SSH 'NV '110 f4!1!3ed ZSd Sd0 'NV'WSO ZSd SdO 'NV'INSO 1,00 Sd0 'SIV
110 A1!I!3ed 1,00 Sd0 ')(V 'H P!Ae(] 'ssa6jn8 ';se3 APV nu3 33SSH NV'tio6aa0 'jnquV
'V fue0 'uosua8'ejpuef9lV 'oue;se0'(VO0) S p!ne(]'RgoaI (VO(]) 1 euo;o!n'uosn6jad :00
(VO(]) l jal!uuar ';unH :01
INd91,:9£LOZ'LO (Inr'RepunS :;uaS
[woo'dq@0110O300dSd0>1V] li 009 00d Sd0 NV :wojd
od -! aa;!uuar `;unH
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000033
2. Facility Name
PBU GC 3
3. Field
PBU - WOA
4. Operator
BP
5. Monlhlyear of Disposition
July -2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
8. Flared or vented l hour or less
3,662
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
19,564
11. Assist Gas
0
12. Fuel gas used in lease operations.
499,570
13. Other (see instructions)
U
Official Use Only
Authorization >l hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
522,796
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-25,316,588
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature &d4i Title Mana er Production Taxes and R alties Alaska
Note: All volumes must be corrected
to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
AAC25.235.
Printed Name Diane Colley Phone (907) 564-5775 Date
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com)
Sent: Sunday, July 07, 2013 6:18 PM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, HSSEE Env Adv East; Burgess, David H; AK, OPS GC1 Facility OTL;
AK, OPS GC1 OSM; AK, OPS FS2 OSM; AK, OPS FS2 Facility OTL; AK, HSSEE Env Adv
West; AK, OPS GC3&PCC OSM; AK, OPS GC3 Facility & Field OTL; AK, OPS FSI OSM;
AK, OPS FSI Facility OTL; Kruger, Dale O
Subject: Gas flaring events at GC1, GC3, FS1, FS2
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
iennifer hunt(aalaska.00v dave robvO-alaska.aov victoria.ferguson@alaska.gov
From: Kellie Okonek, GPB Production Optimization Team Leader
A flaring event occurred at GC1 starting at 06/28/2013 16:30 and stopping at 06/28/2013 18:15 with a volume of 390
(MSCF). The event lasted for 105 minutes and was due to depressurization of spare GLT compressor when EOA Big AL
was loaded. Flaring stopped when depressurization was complete.
A flaring event occurred at GC1 starting at 06/29/2013 17:57 and stopping at 06/29/2013 19:10 with a volume of 10
(MSCF). The event lasted for 73 minutes and was due to start-up test for K-7000 and spin of coppus for cool down.
A flaring event occurred at GCI starting at 07/05/2013 00:00 and stopping at 07/06/2013 with a volume of 40 (MSCF).
The event lasted for 1440 minutes and was due to flaring during GLT K3300 startup. Flaring stopped when startup
complete.
A flaring event occurred at GC3 starting at 06/29/2013 19:09 and stopping at 06/29/2013 20:10 with a volume of 551
(MSCF). The event lasted for 61 minutes and was due to LPS compressor s/d due to thermocouple deviations and V4
recycle valve I/P failure. Flaring stopped when production was curtailed and compressor re -loaded after repairs complete.
A flaring event occurred at FSI starting at 06/27/2013 20:35 and stopping at 06/27/2013 23:00 with a volume of 604
(MSCF). The event lasted for 145 minutes and was due to unloading of the 1802 STV/IP compressor due to high ambient
temps. Flaring stopped when the alternate 1801 compressor was loaded.
A flaring event occurred at FS1 starting at 06/28/2013 00:01 and stopping at 06/28/2013 01:26 with a volume of 354
(MSCF). The event lasted for 85 minutes and was due to unloading of the 1801 STV/IP compressor due to high ambient
temps. Flaring stopped when the alternate 1802 compressor was loaded..
A flaring event occurred at FSI starting at 07/01/2013 16:35 and stopping at 07/01/2013 20:20 with a volume of 851
(MSCF). The event lasted for 225 minutes and was due to depressurization of DS12 for planned maintenance. Flaring
stopped when depressure complete.
A flaring event occurred at FS1 starting at 07/07/2013 09:50 and stopping at 07/07/2013 11:30 with a volume of 851
(MSCF). The event lasted for 100 minutes and was due to depressurization of 12-B and 12-C commonlines for removal of
pig launcher and receiver.
A flaring event occurred at FS2 starting at 06/30/2013 00:54 and stopping at 06/30/2013 04:03 with a volume of 929
(MSCF). The event lasted for 189 minutes and was due to depressurization of A -HP, B -HP, A -IP & A -Treater Flash Drum
for A -train turnaround work. Flaring stopped when the HP oil trains were depressured.
Please let me know if you have any questions.
Kellie Okonek (alt. Travis Rybicki)
PCCIEOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 382 1370 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akoosvcceoctlO_bo.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000033
2. Facility Name
PBU GC 3
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
I August -2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
2,400
10. Pilot and Purge
16,822
11. Assist Gas
0
12. Fuel gas used in lease operations.
512,514
13. Other (see instructions)
0
Official Use Only
Authorization >t hr:
Safety
Z 'Ci G D
MCF
14. TOTAL VOLUME (ITEMS 6.12)
531,736
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
�1
---- [e TDate
18. Transferred to: (Express as a negative #) CGF
-24,6221340
Commissioner
19. Remarks:
I hereby certify that t foregoing is true anq correct to the best of my knowledge.
Signature `l Title Manager Production Taxes and Ro alties Alaska
Note: All volumes must be corrected
to pressure Of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.
Printed Name Diane ColleyPhone (907) 564-5775 Date /
VL F
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
anned Events
DATE
Or equal t0
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT -GC -3
GAS FLARING INCIDENT REPORT
August 2013
Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 0
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT&CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
8/23-24/2013 2100-1530 2,400 See Attachments See Attachments
TOTAL 2,400
TOTAL
Unplanned Events < 1 Hour 0
Unplanned Events> 1 Hour 0
Planned Events < 1 hour and not 0
exceeding 5,000 MCF
Planned Events> 1 hour or 2,400
exceeding 5,000 MCF
Pilot Purge 16,822
Assist 0
TOTAL FLARED VOLUME 19,222
Page 8
9/12/2013
3:32 PM
Flare Start Date 08/01/2013
Flare End Date 08/31/2013
GC3 Flare Report Total Volume (MSCF) 2400
Report
Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
13-430 Controlled Blowdown 08/23/2013 9:00:00 pm 12:00:00 am 180 min No No Yes BPIUMRTINJE 400
Determination Cause Relieve pressure below #250 for planned line lift 8 inspection of GT -13.
Action Taken Pressure dropped W#250.
13-432 Controlled Blowdown 08/24/2013 12:00:00 am 3:30:00 pm 930 min Yes No Yes BP1\BESTM2 2000
Determination Cause Bleed pressure under 4250 to flare from GT -13 for line lift & inspection.
Action Taken Pressure dropped under #250.
Total Volume (MSCF) 2400
Generated 09/04/2013 10:13:15AM Page 12 of 12
wo6 q 1156955mpew-a
(00 L9# ss900e - V03) 069L Jo (g£Z17 # SS900e - VOM) 17L9 Ja6ed
170171789L :/uowJeH OLEL Z8£ (L06) :I1a0
(009d) 9999 / (009) ZL1717699 (L06) :lewalx9
tl uo!lemw!ld0 uo!lonpwd 003/03d
(!Ao!gA8 slneJJ lie) )[auoi!p 01II0M
suo!lsenb (ue 9neg no/;! mou> aw;91 aseald
ZOg L of pagol!ms suo!leJado uaym peddois
6uueld senssl leuogeJado 6ulneg L09L JossaJdwoo dl//US 01 anp sem pue salnu!w Zg Jo; palsel Juana agl (dOSW)
Z48 ;o awnlon a gl!m ZZ:17L ELOZ/OZ/g0 le 6ulddols pue OO:EL ELOZ/OZ/g0 le 6u!1J83s ESd le paJJn000 Juana 6ulJegy
6!sd 09Z mo19q of paonpaJ aJnsseid uaym paddols
6uueld 'suogoodsul pauueld Jo; £ L -1J do uogezlJnsseidep of anp sem pue salnulw OE6 Jo; palsel Juana agl '(dOSW)
OOOZ;o awnlon a g1!m 0£:9L ELOZ/17Z/801e 6ulddols pue 00:00 ELOZ/17ZI80 3e 6u.1Jels EOE:) 3e paJJnoOo Juana 6uue1; y
suo!loedsul pauueld Jo; au!I E L -1J aql;o uo!lezunssaJdap of anp sem pue salnulw 99Z Jol palsel Juana 941
(dOSW) 08615 awnlon a gl!m ELOZ/17Z/80le 6u!ddols pue 917:6L £LOVEZ/80 le 6ullJe1s LOJ le paJJn000 Juana 6uueg V
suo!loadsu! pauueld Jo; EL -1J eql;o uollezunssaJdap
leu!; of anp sem PUB (dOSN!) 0009 uegj JaleaJ6 awnlon a peg Juana agl sa;nulw 9ZZ L Jol PalSel Juana aql '(dOSW)
gZgL;o awnlon a gl!m Z9:OZ ELOZ/17Z/801e 6u!ddoJs pue 17Z:00 E LOZ/17Z/80 le 6ugJe;s LOO le paJJn000 Juana 6uuel; y
An Aoeq 6uldLueJ sem ll°J se /1!!!gels leuolleJado Jo; sJossaJdwoo
dl/dl agl jjo 6u!Jel; of anp sem pue (dOSW) 0009 uegj Jajm6 awnlon a peg Juana agl selnulw g£g Jo; pals81 Juana agl
(dOSW) 8174910 awnlon a ql!m £ LOZ/gZ/8o le 6u!ddols PUB 17Z:E L E LOZ/17Z/80 le 6ullJels ZOJ le paJJn000 Juana 6uuelJ V
aleJ pau!l se6;o dnlJels 6wJnp do aweo aJnssaJd wals/s 3!sueJl ag; se sJ0ss9Jdw00 sdl agl
jjo 6uueg o; anp sem pue (dOSW) 0009 uegl Jale9J6 awnlon a peg Juana agl 'salnu!w 09L Jo; palsel Juana agl '(ZIOSIN)
C99L;o awnlon a 41!m OO:E L £ LOZ/9Z/80 le 6u!ddols pue 00:00 E LOZ/9Z/80 le 6wJJels ZOO le paJJn000 Juana 6uue1; V
Japeal weal uo!lez!w!ld0 uo!lonpoJd 9dJ 'mauom0 91119){ :woJd
no gseie uosn Ja; eu0J0!n no e>Isele goranep AOT eAsele lung Jalluua,
OOJOV 'uosn6Jad eU015!A :00 OOJOV 'Agoa 9ne0 :00 OOJOV 'lunH J911uu9r :01
£Sd '£OJ 'ZOO ' LOJ le sJuana 6uue9 se0 :loa[gng
Jsel APV nu3 33SSH ')4V 'H P!Ae0 'ssa6Jng 'l10
A4!1158d ESd SdO '>IV'WSO £Sd SdO '>IV'WSO OOd'8EO9 SdO '>IV 'l1O P191=1,2 Al!I!6ed
£OJ SdO '>IV'WSO ZOO SdO '>IV 'l10 Al!l!5ed ZOO SdO '>!V'JsaM APV Au3 33SSH
W ASO LOO SdO 'AV'110 A!1!5ed LOD SdO '>! 'O 9180 'Ja6nJ>l'/uo6aJ0 'JngijV
'V Geo'uosueg'eJpue[a1V'oue;se0'(V00) S P.I(I' qOu W00) l 8U0J01n'uosn6J9d 53
(VOO) l Ja;!uuar 'lunH :01
Wd 90: L L £ LOZ 19Z lsnbnV ' (epunS :;uas
[woo*dq@l1003OOdSdO)4VI 11 009 30d SdO'>IV :woJd
bocci) -1 Ja}!uuar `junH
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000033
2. Facility Name
PBU GC 3
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
I September -2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
O
Pool Name Pool Code Percent
7. Reinjected
0
8. Flared or vented l hour or less
16
9. Flared or vented more than 1 hour (see instr.)
1,739
10. Pilot and Purge
14,905
11. Assist Gas
0
12. Fuel gas used in lease operations.
459,717
13. Other (see instructions)
U
Official Use Only
Authorization >1 hr:
Safety
�.� q
/
MCF
14. TOTAL VOLUME (ITEMS 6-12)
476,377
Lease Use
MCF
15. NGL Gas Equivalent
U
Conservation
MCF
16. Purchased gas
U
Waste:
MCF
17. Transferred from:
U
Commissioner Date
18. Transferred to: (Express as a negative # CGF
( p 9 )
-23,205,593
19. Remarks:
I hereby certify that Mis a nd orrect to the best of my knowledge.
Note: All volumes must be corrected
SignatureTitle Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date 10148 AAC25.235.
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -3
GAS FLARING INCIDENT REPORT
September 2013
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
9/14/2013 0815-0819 16 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 16
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
9/17-18/2013 2002-0200 1,239 See Attachments See Attachments
TOTAL 1,239
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
9/12/2013
TOTAL
1930-2100
TOTAL
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
O
500 See Attachments
GYrP
TOTAL
16
1,239
0
500
14,905
0
16,660
See Attachments
Page 9
10/11/2013
8:58 AM
Flare Start Date 09/01/2013
Flare End Date 09/30/2013
GC3 Flare Report Total Volume (MSCF) 1755
Report
Numbs System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
13-456 Other 09/12/2013 7:30:00 pm 9:00:00 pm 90 min No No Yes BP1\BESTM2 500
Determination Cause Water Wash Turbine spindown.
Action Taken Water Wash complete@ 21:00
13-470 Other 09/17/2013 8:02:00 pm 12:00:00 am 238 min No No No BP1\JOHNSOM 826
Determination Cause Wet Gas compressor shutdown because of control/instrumentation failure associated with a nitrogen purge failure
Action Taken WOA reduced produc0on rates and shut-in 11 wells equaling 48 mmscfd. Wells were shut-in or choked back starting at 2100 hours.
13-471 Other 09/18/2013 12:01:00 am 2:00:00 am 119 min No No No BPIUGHNSOM 413
Determination Cause Wel Gas compressor shutdown because of control/instrumentation failure associated with a nitrogen purge failure
Action Taken WOA reduced production rates and shut-in 11 wells equaling 48 mmscfd. Wells were shut-in or choked back starting at 2100 hours on
Total Volume (MSCF) 1755
Generated 10/02/2013 9:20:43AM Page 10 of 10
Hunt, Jennifer L (DOA)
From:
AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent:
Tuesday, September 17, 2013 9:41 AM
To:
Hunt, Jennifer L (DOA)
Cc:
Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; Kruger, Dale O; AK, OPS GC3 Facility & Field OTL; AK, OPS GC3&PCC
OSM; AK, HSSEE Env Adv West
Subject:
Gas flaring event avow
To: Jennifer Hunt, AOGCC
Jennifer. h u nt(a)alaska.gov
CC: Dave Roby, AOGCC
dave. robvna alaska.gov
From: Travis Rybicki, GPB Production Optimization Team Leader
CC: Victoria Ferguson, AOGCC
victoria.ferguson(a alaska.gov
A flaring event occurred at GC3 starting at 09/12/2013 19:30 and stopping at 09/12/2013 21:00 with a volume of 500
(MSCF). The event lasted for 90 minutes. Flaring occurred during the planned water washing of LPS T/C K7000. Flaring
ended when the planned water wash activities were completed.
Please let me know if you have any questions.
Travis M. Rybicki
PCC.EOC (Production Optimization) Team Lead
Office 907-659-4472 (BOC) 659-5566 (PBOC)
Cell 907-748-2118 Harmony 758-4404
GPB Pager 907-659-5272 # 1890
a ko p s ecce o ctl (a7 b p. CO m
Alternate; Kellie Okonek
Hunt, Jennifer L (DOA
From: AK, OPS PCC EOC TL (AKOPSPCCEOCTL@bp.comj
Sent: Wednesday, September 25, 2013 10:49 PM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; Kruger, Dale 0; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; AK,
HSSEE Env Adv West; AK, OPS GC3 Facility & Field OTL; AK, OPS GC3&PCC OSM; AK,
OPS FS3 OSM; AK, OPS FS3 Facility OTL; Burgess, David H; AK, HSSEE Env Adv East; AK,
OPS PCC EOC TL; AK, OPS FS2 OSM; AK, OPS FS2 Facility OTL
Subject: Gas flaring events at GC1, MOWS2, FS3
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson,
AOGCC
j_ennifer huntna.alaska.gov dave roby(o)alaska.gov
victoria.ferquson(o)alaska.gov
From: Kellie Okonek, GPB Production Optimization Team Leader
A flaring event occurred at FS2 starting at 09/24/2013 01:00 and stopping at 09/24/2013 03:00 with a volume of 214
(MSCF). The event lasted for 120 minutes, and was due to depressurization of 9A commonline for repairs. Flaring
stopped when line depressured.
A flaring event occurred at FS2 starting at 09/23/2013 20:30 and stopping at 09/23/2013 23:30 with a volume of 479
(MSCF). The event lasted for 180 minutes, and was due to DS9E commonline coming down to swap blinds.
A flaring event occurred at FS3 starting at 09/22/2013 14:20 and stopping at 09/22/2013 15:40 with a volume of 60
(MSCF). The event lasted for 80 minutes, and was due to depressurization of 6D commonline to install a pig launcher.
Flaring stopped when line depressured.
A flaring event occurred at GCI starting at 09/18/2013 02:20 and stopping at 09/18/2013 15:00 with a volume of 220
(MSCF). The event lasted for 760 minutes, and was due to scheduled water wash on K7001.
A flaring event occurred at GC3 starting at 09/18/2013 00:01 and stopping at 09/18/2013 02:00 with a volume of 413
(MSCF). The event lasted for 119 minutes, and was due to wet gas compressor shutdown due to control/instrumentation
failure. Flaring stopped when WOA production was decreased.
A flaring event occurred at GC3 starting at 09/17/2013 20:02 and stopping at 09/18/2013 with a volume of 826 (MSCF).
The event lasted for 238 minutes, and was due to wet gas compressor shutdown due to control/instrumentation failure.
Flaring stopped when WOA production was decreased.
A flaring event occurred at FS3 starting at 09/17/2013 14:14 and stopping at 09/17/2013 15:51 with a volume of 74
(MSCF). The event lasted for 97 minutes, and was due to depressurization of 6B for the make-piggable project.
A flaring event occurred at GC1 starting at 09/16/2013 03:00 and stopping at 09/16/2013 22:30 with a volume of 6070
(MSCF). The event lasted for 1170 minutes. The event had a volume greater than 5000 (MSCF) and was due to
depressurization of GT -13 in support of line lifts for inspection.
Please let me know if you have any questions.
Kellie Okonek (alt. Travis Rybicki)
PCCIEOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 382 1370 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akopspcceoctl(a)bp com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000033
2. Facility Name
PBU GC 3
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
October -2013
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Pool Name Pool Code Percent
7. Reinjected
0
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
7,500
10. Pilot and Purge
13,805
11. Assist Gas
0
12. Fuel gas used in lease operations.
511,936
13. Other (see instructions)
0
OfBclal Use Only
Authorization>1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
533,241
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
Q
Waste:
MCF
17. Transferred from:
0
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-25,108,541
19, Remarks:
I hereby certify that th oregoing is true and c rrect to the best of my knowledge.
n M&/1 Note: All volumes must be corrected
Signature_ JJ Title Mana er Production Taxes and Ro Ities Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 DatedIAL AAC25.235.
VL F
�/3/)4-
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Flare Start Date 10/01/2013
Flare End Date 10/31/2013
GC3 Flare Report Total Volume (MSCF) 7500
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
13-531 Controlled Slowdown 10/15/2013 9:30:00 am 11:00:00 am 90 min Yes No Yes BP1\JOHNSOM 7500
Determination Cause LPS Slug catcher V-7002 shut down and de -pressure for maintenance on drain header.
Action Taken WOA reduced production rales and shut-in production to v-7002 for de -pressuring and maintenance.
Daily Volume (MSCF) 7500
Total Volume (MSCF) 7500
Generated 11/04/2013 3:38:24PM Page 13 of 13
Hunt Jennifer L (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com)
Sent: Tuesday, October 15, 2013 10:56 AM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; Kruger, Dale O; AK, OPS GC3 Facility & Field OTL; AK, OPS GC3&PCC
OSM; AK, HSSEE Env A v West
Subject: Gas flaring event at
To: Jennifer Hunt, AOGCC
iennifer.hunt@alaska.gov
CC: Dave Roby, AOGCC
dave roby(a)alaska.gov
From: Travis Rybicki, GPB Production Optimization Team Leader
CC: Victoria Ferguson, AOGCC
victoria fergusonp_alaska.gov
A flaring event occurred at GC3 starting at 10/15/2013 09:30 and stopping at 10/15/2013 11:00 with a volume of 7500
(MSCF). The event lasted for 90 minutes. Flaring occurred during the planned shut down and depressuring of A Bank
LPS Slug Catcher for planned maintenance activities. Production rates were decreased to the GC3 facility. Flaring
ended when the vessel/system was depressured, prepared for maintenance and the flare valves closed.
Please let me know if you have any questions.
Travis M. Rybicki
PCC.EOC (Production optimization) Team Lead
Office 907-659-4472 (BOC) 659-5566 (PBOC)
Cell 907-748-2118 Harmony 758-4404
GPB Pager 907-659-5272 # 1890
akopsocceoctl(a)bp Com
Alternate: Kellie Okonek
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000033
2. Facility Name
PBU GC 3
3. Field
PBU - WOA
4. Operator
I BP
5. Monthfyear of Disposition
November -2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
O
Pool Name Pool Code Percent
7. Reinjected
0
8. Flared or vented 1 hour or less
1
9. Flared or vented more than 1 hour (see instr.)
1,254
10. Pilot and Purge
16,163
11. Assist Gas
0
12. Fuel gas used in lease operations.
498,284
13. Other (see instructions)
p
Official Use Only
Authorization >1 hr.
Safety
� Z TA
IT
MCF
14. TOTAL VOLUME (ITEMS 6-12)
515,702
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas 1
0
Waste:
MCF
17. Transferred from:
6
r
Cmissioner Date
18. Transferred to: (Express as a negative #) CGF
-25,144,023
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature Mao / ' a / n Note: All volumes must be corrected
Title Mana er Production Taxes and Ro allies Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date dgLb AAC25.235.
VZ- F-
6 /3/1q -
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Flare Start Date 11/01/2013
Flare End Date 11/30/2013
GC3 Flare Report Total Volume (MSCF) 1255
Report
Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
13-553 Flare Relief 11/01/2013 6:00:00 pm 12:00:00 am 360 min No No No BP1\HAWKJ5 1075
Determination Cause Wet Gas compressor shutdown because of control/instrumentation failure associated with a faulty suction pressure instrument PI -03-55138.
Action Taken Equipmentwas restarted at 0100 hours on 11/2/2013 after the instrument was replaced.
13-554 Flare Relief 11/02/2013 12:0000 am 10000 am 60 min No No No BP1\HAWKJ5 179
Determination Cause Wet Gas compressor shutdown because of control/instrumentation failure associated with a faulty suction pressure instrument PI -03-5513B
Action Taken Equipmentwas restarted at0100 hours afterthe pressure instrumentwas replaced.
13-578 Flare Relief 11/28/2013 3:00:00 pm 4:00:00 pm 60 min No No Yes BP1\HOLLLB 1
Determination Cause Depressured C' S/C for scheduled work.
Action Taken Depressurization complete.
Total Volume (MSCF) 1255
Generated 12/02/2013 1:44:10PM Page 8 of 8
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent: Tuesday, November 12, 2013 8:22 AM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; Kruger, Dale O; AK, OPS GC3 Facility & Field OTL; AK, OPS GC3&PCC
OSM; AK, HSSEE Env Adv West
Subject: Gas flaring events a
To: Jennifer Hunt, AOGCC
iennifer.hunt(a)alaska.gov
CC: Dave Roby, AOGCC
dave.robv(a alaska.goy
From: Travis Rybicki, GPB Production Optimization Team Leader
CC: Victoria Ferguson, AOGCC
victoria ferguson( alaska.gov
A flaring event occurred at GC3 starting at 11/01/2013 18:00 and stopping at 11/01/2013 24:00 with a volume of 1075
(MSCF). The event lasted for 360 minutes. Flaring occurred during the unplanned shut down of the K5500 Wet Gas
compressor due to a control instrumentation failure. Flaring continued while troubleshooting and subsequent repair of the
failed instrument occurred. Flaring continued into the following day.
A flaring event occurred at GC3 starting at 11/02/2013 00:00 and stopping at 11/02/2013 01:00 with a volume of 179
(MSCF). The event lasted for 60 minutes. Flaring occurred during the unplanned shut down of the K5500 Wet Gas
compressor due to a control instrumentation failure. Flaring continued while troubleshooting and subsequent repair of the
failed instrument occurred. Flaring ended when the failed instrument was replaced, K5500 was restarted and loaded and
the flare valves closed.
Please let me know if you have any questions.
Travis M. Rybicki
PCC-EOC (Production Optimization) Team Lead
Office 907-659-4472 (BOC) 659-5566 (PBOC)
Cell 907-748-2118 Harmony 758-4404
GPB Pager 907-659-5272 # 1890
akoospcceoctlC�bp. com
Alternate: Kellie Okonek
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000033
2. Facility Name
P13 GC 3
3. Field
PBU - WOA
4. Operator
BP
5. Month/Year of Disposition
December -2013
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Q
Pool Name PoolCode Percent
7. Reinjected
Q
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
15,218
10. Pilot and Purge
15,894
11. Assist Gas
0
12. Fuel gas used in lease operations.
518,422
13. Other (see instructions)
Q
Official Use Only
Authorization >1 hr:
Safety
2 [
/� �
MCF
14. TOTAL VOLUME (ITEMS 6-12)
549,534
Lease Use
MCF
15. NGL Gas Equivalent
Q
Conservation
MCF
16. Purchased gas
Q
Waste:
MCF
17. Transferred from:
Q
t`
18. Transferred to: (Express as a negative #) CGF
-25,818,644
Commissioner Date
19. Remarks:
I hereby certify that th foregoing is true and correct to the best of my knowledge.
Signature t+" r ^ Title Manager Production Taxes and Rgyalties Alaska
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.
Printed Name Diane ColleyPhone (907) 564-5775 Date Ilalq
V[ -r
rola/[¢
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT -GC -3
GAS FLARING INCIDENT REPORT
December 2013
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 0
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
12/6/2013 0648-1100 13,650 See Attachments See Attachments
12/23/2013 0100-0945 1,568
TOTAL 15,218
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DESCRIPTION OF INCIDENT & CAUSE
See Attachments
TOTAL 0
Planned Events Exceeding 1 Hour OR > 5,000 mcf
See Attachments
TOTAL 0
& CAUSE
See Attachments
ACTION TAKEN TO E
See Attachments
Page 9
1/12/2014
10:27 AM
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events > 1 Hour
15,218
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
15,894
Assist
0
TOTAL FLARED VOLUME
31,112
& CAUSE
See Attachments
ACTION TAKEN TO E
See Attachments
Page 9
1/12/2014
10:27 AM
Flare Start Date 12/01/2013
Flare End Date 12/31/2013
GC3 Flare Report Total Volume (MSCF) 15218
Report
Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
13-583 Flare Relief 12/06/2013 6:48:00 am 11:00:OOam 252min No No No BPI\JOHNSOM 13650
Determination Cause V-3018 HP seperator shutdown because of a problem associated with leaking drain flange.
Action Taken WOA stopped production rates to V-301 B, flaring continued until maintenance could get flange tightened and leak fixed.
13-595 Flare Relief 12/23/2013 1:00:00 am 9:45:00 am 525 min Yes No No BP1 WAWK15 1568
Determination Cause PCM 144 card failure caused "Plant Stop Production" shutdown. LP gas flared only during statup period
Action Taken Restarted K-5500 LP Gas Compressor,
Total Volume (MSCF) 15218
Generated 01/06/2014 9:50:43AM Page 8 of 8
Hunt Jennifer L (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent: Tuesday, December 10, 2013 11:46 AM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; Kruger, Dale O; AK, OPS GC3 Facility & Field OTL, AK, OPS GC3&PCC
OSM; AK, HSSEE Env Adv West
Subject: Gas flaring event atm
To: Jennifer Hunt, AOGCC
Jennifer hunt(cDalaska.00v
CC: Dave Roby, AOGCC
dave.robvna alaska.pov
From: Travis Rybicki, GPB Production Optimization Team Leader
CC: Victoria Ferguson, AOGCC
victoria ferouson(cDalaska.gov
A flaring event occurred at GC3 starting at 12/06/2013 06:48 and stopping at 12/06/2013 11:00 with a volume of 13650
(MSCF). The event lasted for 252 minutes. Flaring occurred during the repair to a leaking drain flange on HP Separator
V-301 B. Production to V-301 B was stopped/re-routed while repairs were made. V-301 B was routed to flare system as
part of energy isolation to effect repair to leaking flange. Flaring ended when the repair was make (flange tightened) and
the leak stopped.
Please let me know if you have any questions.
Travis M. Rybicki
PCC-EOC (Production Optimization) Team Lead
Office 907-659-4472 (BOC) 659-5566 (PBOC)
Cell 907-748-2118 Harmony 758-4404
GPB Pager 907-659-5272 # 1890
a k o ps pcce o ctl (a7. b O. CO m
Alternate: Kellie Okonek
Hunt Jennifer L (DOA)
From:
AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent:
Tuesday, January 07, 2014 7:43 AM
To:
Cc:
Hunt, Jennifer L (DOA)
Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; Kruger, Dale O; AK, OPS GC3 Facility & Field OTL; AK, OPS GC3&PCC
OSM; AK, HSSEE Env Adv West
Subject:
Gas flaring event at GC3
To: Jennifer Hunt, AOGCC
iennifer hunt(aalaska.gov
CC: Dave Roby, AOGCC
dave roby(aalaska.aov
From: Travis Rybicki. GPB Production Optimization Team Leader
CC: Victoria Ferguson, AOGCC
victoria ferauson(a alaska.00v
A flaring event occurred at GC3 starting at 12/23/2013 01:00 and stopping at 12/23/2013 09:45 with a volume of 1568
(MSCF). The intermittent event lasted for 525 minutes. Flaring occurred during the unplanned shutdown of the GC3
facility related to a PCM card failure. Flaring continued during the troubleshooting and restart period for GC3. Flaring
ended when the facility was restarted and flare valves closed.
Please let me know if you have any questions.
Travis M. Rybicki
PCC-EOC (Production Optimization) Team Lead
Office 907-659-4472 (BOC) 659-5566 (PBOC)
Cell 907-748-2118 Harmony 758-4404
GPB Pager 907-659-5272 # 1890
akopspcceoctlCcDbp Com
Alternate: Kellie Okonek