Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPBU Lisburne Prod (GPMA) Gas DispositionState of Alaska AOGC C Gas Disposition Files Year: 2013 Facility: PBU Lisburne Prod (GPMA) Operator: BP EXPLORATION (ALASKA) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DiSPORITinN 1. Facility Number2. Facility Name 0290000009 PBU LISBURNE PROD (GPMA) Disposition 3. Field PBU - GPMA Volume MCF 4. Operator •5. Monthfyear of Disposition BP Janua -2013 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 106,002 Pool Name Pool Code Percent 7, Reinjected 10,854,743 Lisburne 640144 33.7% Niakuk 640148 0.8% 8. Flared or vented 1 hour or less 210 North Prudhoe Bay State 640152 0.0% Sadlerochit 640150 6.6% 9. Flared or vented more than 1 hour (see instr.) 0 Point McIntyre 640180 58.5% Ivishak-SagRiver test in 640147 0.4% 10. Pilot and Purge 12,007 West Beach 1 640186 0.0% 11. Assist Gas 143,898 12. Fuel gas used in lease operations. 910,600 13. Other (see instructions) 298 998Official Use Only Authorization>1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 12,326,458 Lease Use MCF 15. NGL Gas Equivalent 106,002 Conservation MCF 16. Purchased gas � waste: MCF 17. Transferred from: 1,095,980 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,095,980 and Fuel Gas from Prudhoe = 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature Title Man a er Production Taxes and Ro allies Alaska to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date 2) AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION ALASKA, INC, :ONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jan -13 VOLUME DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE 1/27/2013 2329-2359 69 Not required for Unplanned events < 1 hr Total Flare <=1 Hour 69 Total Flare > 1 Hour 0 Volume Flared 69 Measured Safety Pilot 4,050 Continuous Assist 48.595 TOTALFLARED 52,714 PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Unplanned Not required for Unplanned events < 1 hr VOLUME DATE TIME 1/27/2013 2329-2359 2 Total Flare <=1 Hour 2 Total Flare> 1 Hour 0 Volume Flared 2 Measured Safety Pilot 96 Continuous Assist 1,147 TOTAL FLARED 1,245 BP EXPLORATION ALASKA, INC, :ONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jan -13 DESCRIPTION OF INCIDENTS & CAUSE Not required for Unplanned events < 1 hr PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Unplanned Not required for Unplanned events < 1 hr BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jan -13 VOLUME DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE 1/27/2013 2329-2359 124 Not required for Unplanned events < 1 hr Total Flare <=1 Hour 124 Total Flare > 1 Hour 0 Volume Flared 124 Measured Safety Pilot 7,028 Continuous Assist 84,165 TOTAL FLARED 91,317 PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Unplanned Not required for Unplanned events < 1 hr VOLUME DATE TIME 1/27/2013 2329-2359 14 Total Flare <= 1 Hour 14 Total Flare > 1 Hour 0 Volume Flared 14 Measured Safety Pilot 787 Continuous Assist 9,441 TOTAL FLARED 10,242 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jan -13 DESCRIPTION OF INCIDENTS & CAUSE Not required for Unplanned events < 1 hr PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Unplanned Not required for Unplanned events < 1 hr VOLUME DATE TIME 1/27/2013 2329-2359 1 Total Flare <=1 Hour 1 Total Flare > 1 Hour 0 Volume Flared 1 Measured Safety Pilot 46 Continuous Assist 550 TOTAL FLARED 597 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jan -13 DESCRIPTION OF INCIDENTS & CAUSE Not required for Unplanned events < 1 hr PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Unplanned Not required for Unplanned events < 1 hr BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jan -13 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 1/27/2013 2329-2359 0 Total Flare <=1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr VOLUME DATE TIME 1/27/2013 2329-2359 0 Total Flare <=1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTALFLARED 0 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jan -13 DESCRIPTION OF INCIDENTS & CAUSE Not required for Unplanned events < 1 hr PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Unplanned Not required for Unplanned events < 1 hr STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator BP 5. MonthNear of Disposition I February -2013 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 68,313 Pool Name Pool Code Percent 7. Reinjected 6,287,005 Lisburne 640144 40.83/6 Niakuk 640148 2.1% 8. Flared or vented 1 hour or less 1,847 North Prudhoe Bay State 640152 0.0% Sadlerochit 640150 2.5% 9. Flared or vented more than 1 hour (see insh.) 0 Point McIntyre 640180 53.9% Ivishak-Saq River test in 640147 0.7% 10. PilotandPurge 10,839 West Beach 640186 0.0% 11. Assist Gas 145,028 12. Fuel gas used in lease operations. 641,526 13. Other (see instructions) 267,997 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 7,422,555 Lease Use MCF 15. NGL Gas Equivalent 68,313 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 992,210 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 991,205 and Fuel Gas from Prudhoe = 1,005 1 hereby certify that the foregoing is We and correct to the best of my knowledge. Note: All volumes must be corrected Signature Title Manager Production Taxes and Rove ties Alaska t0 pressure Of 14.65 psia and to a / temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate Total Flom <=1 Hour 972 Total Flare> 1 Hour Volume Flared 972 Measured Safety Pilot 4,998 Continuous Assist 68,079 TOTALFLARED 74,049 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER N0. 219 PRUDHOE RAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Feb -13 VOLUME PLANNED DATE TIME (MSCF( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 2/1/2013 1357-1439 95 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr 2/14/2013 1731-1735 115 See Attachments Planned See Attachments 2/14/2013 2057-2058 12 See Attachments Planned See Attachments 2/18/2013 2226-2235 9 Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events < 1 hr 2/19/2013 0848-0849 2 See Attachments Planned See Attachments 2/19/2013 1510-1511 14 See Attachments Planned See Attachments 2/19/2013 1649-1650 49 See Attachments Planned See Attachments 2/19/2013 2125-2127 52 See Attachments Planned See Attachments 2/19/2013 2226-2235 10 See Attachments Planned See Attachments 2/20/2013 1605-0607 53 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr 2/20/2013 1927-1929 56 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr 2/21/2013 0007-0008 4 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr 2/21/2013 0008-0011 80 Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events < 1 hr 2/21/2013 1905-1907 28 Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events < 1 hr 2/21/2013 2057-2101 169 Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events <1 hr 2/22/2013 0837-0841 173 Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events <1 hr 2/24/2013 1129-1131 51 Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events <1 hr Total Flom <=1 Hour 972 Total Flare> 1 Hour Volume Flared 972 Measured Safety Pilot 4,998 Continuous Assist 68,079 TOTALFLARED 74,049 BP EXPLORATION ALASKA, INC, :ONSERVATION ORDER NO. 219 DATE TIME VOLUME fMscf) PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Feb -13 DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 2/1/2013 1357-1439 3 Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events <1 hr 2/14/2013 1731-1735 6 See Attachments Planned See Attachments 2/14/2013 2057-2058 1 See Attachments Planned See Attachments 2/18/2013 2226-2235 1 Not required for Unplanned events< S hr Unplanned Not required for Unplanned events <1 hr 2/19/2013 0848-0849 0 See Attachments Planned See Attachments 2/19/2013 1510-1511 1 See Attachments Planned See Attachments 2/19/2013 1649-1650 3 See Attachments Planned See Attachments 2/19/2013 2125-2127 3 See Attachments Planned See Attachments 2/19/2013 2226-2235 1 See Attachments Planned See Attachments 2/20/2013 1605-0607 4 Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events <1 hr 2/20/2013 1927-1929 4 Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events <1 hr 2/21/2013 0007-0008 0 Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events <1 hr 2/21/2013 0008-0011 5 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr 2/21/2013 1905-1907 2 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events <1 hr 2/21/2013 2057-2101 11 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events <1 hr 2/22/2013 0837-0841 12 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr 2/24/2013 1129-1131 3 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr Total Flare <=1 Hour 60 Total Flom> 1 Hour Volume Flared 60 Measured Safety Pilot 293 Continuous Assist 3,925 TOTAL FLARED 4,278 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 DATE TIME VOLUME (MSCF) PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Feb -13 DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 2/1/2013 1357-1439 192 Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events < 1 hr 2/14/2013 1731-1735 177 See Attachments Planned See Attachments 2/14/2013 2057-2058 19 See Attachments Planned See Attachments 2/18/2013 2226-2235 6 Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events <1 hr 2/19/2013 0848-0849 2 See Attachments Planned See Attachments 2/19/2013 1510-1511 7 See Attachments Planned See Attachments 2/19/2013 1649-1650 25 See Attachments Planned See Attachments 2/19/2013 2125-2127 26 See Attachments Planned See Attachments 2/19/2013 2226-2235 5 See Attachments Planned See Attachments 2/20/2013 1605-0607 27 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr 2/20/2013 1927-1929 28 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events <1 hr 2/21/2013 0007-0008 2 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events <1 hr 2/21/2013 0008-0011 42 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr 2/21/2013 1905-1907 14 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr 2/21/2013 2057-2101 88 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr 2/22/2013 0837-0841 90 Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events < 1 hr 2/24/2013 1129-1131 26 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr Total Flare <=1 Hour 776 Total Flare> 1 Hour Volume Flared 776 Measured Safety Pilot 5,277 Continuous Assist 69,338 TOTAL FLARED 75,391 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 229 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Feb -13 DATE TIME VOLUME (Mscf( DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 2/1/2013 1357-1439 20 Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events <1 hr 2/14/2013 1731-1735 0 See Attachments Planned See Attachments 2/14/2013 2057-2058 0 See Attachments Planned See Attachments 2/18/2013 2226-2235 0 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr 2/19/2013 0848-0849 0 See Attachments Planned See Attachments 2/19/2013 1510-1511 0 See Attachments Planned See Attachments 2/19/2013 1649-1650 0 See Attachments Planned See Attachments 2/19/2013 2125-2127 0 See Attachments Planned See Attachments 2/19/2013 2226-2235 0 See Attachments Planned See Attachments 2/20/2013 1605-0607 0 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events <1 hr 2/20/2013 1927-1929 0 Not required for Unplanned events <I hr Unplanned Not required for Unplanned events <I hr 2/21/2013 0007-0008 0 Not required for Unplanned events <I hr Unplanned Not required for Unplanned events <I hr 2/21/2013 0008-0011 0 Not required for Unplanned events <I hr Unplanned Not required for Unplanned events <I hr 2/21/2013 1905-1907 0 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr 2/21/2013 2057-2101 0 Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events <I hr 2/22/2013 0837-0841 0 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr 2/24/2013 1129-1131 0 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr Total Flare <=1 Hour 20 Total Flare> 1 Hour Volume Flared 20 Measured Safety Pilot 171 Continuous Assist 2,360 TOTAL FLARED 2,551 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER N0. 219 PRUDHOE BAY, RAVEN IURNE PRODUCTION CENTER GAS FLARING INCIDENTS Feb -13 DATE TIME VOLUME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 2/1/2013 1357-1439 1 Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events < 1 hr 2/14/2013 1731-1735 2 See Attachments Planned See Attachments 2/14/2013 2057-2058 0 See Attachments Planned See Attachments 2/18/2013 2226-2235 0 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr 2/19/2013 0848-0849 0 See Attachments Planned See Attachments 2/19/2013 1510-1511 0 See Attachments Planned See Attachments 2/19/2013 1649-1650 1 See Attachments Planned See Attachments 2/19/2013 2125-2127 1 See Attachments Planned See Attachments 2/19/2013 2226-2235 0 See Attachments Planned See Attachments 2/20/2013 1605-0607 1 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr 2/20/2013 1927-1929 1 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr 2/21/2013 0007-0008 0 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr 2/21/2013 0008-0011 2 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr 2/21/2013 1905-1907 1 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr 2/21/2013 2057-2101 4 Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events <1 hr 2/22/2013 0837-0841 4 Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events <1 hr 2/24/2013 1129-1131 1 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events <1 hr Total Flom <=1 Hour 19 Total Flare > 1 Hour Volume Flared 19 Measured Safety Pilot 100 Continuous Assist 1,326 TOTAL FLARED 1,445 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Feb -13 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 2/1/2013 1357-1439 0 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events <1 hr 2/14/2013 1731-1735 0 See Attachments Planned See Attachments 2/14/2013 2057-2058 0 See Attachments Planned See Attachments 2/18/2013 2226-2235 0 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr 2/19/2013 0848-0849 0 See Attachments Planned See Attachments 2/19/2013 1510-1511 0 See Attachments Planned See Attachments 2/19/2013 1649-1650 0 See Attachments Planned See Attachments 2/19/2013 2125-2127 0 See Attachments Planned See Attachments 2/19/2013 2226-2235 0 See Attachments Planned See Attachments 2/20/2013 1605-0607 0 Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events < 1 hr 2/20/2013 1927-1929 0 Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events < 1 hr 2/21/2013 0007-0008 0 Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events < 1 hr 2/21/2013 0008-0011 0 Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events < 1 hr 2/21/2013 1905-1907 0 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr 2/21/2013 2057-2101 0 Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events < 1 hr 2/22/2013 0837-0841 0 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr 2/24/2013 1129-1131 0 Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events <1 hr Total Flare <=1 Hour 0 Total Flom ,1 Hour Volume Flared Measured Safety Pilot Continuous Assist TOTALFLARED 0 Total Flare <=1 Hour 0 Total Flom .1 Hour Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTALFLARED 0 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Feb -13 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 2/1/2013 1357-1439 0 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr 2/14/2013 1731-1735 0 See Attachments Planned See Attachments 2/14/2013 2057-2058 0 See Attachments Planned See Attachments 2/18/2013 2226-2235 0 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events <1 hr 2/19/2013 0848-0849 0 See Attachments Planned See Attachments 2/19/2013 1510-1511 0 See Attachments Planned See Attachments 2/19/2013 1649-1650 0 See Attachments Planned See Attachments 2/19/2013 2125-2127 0 See Attachments Planned See Attachments 2/19/2013 2226-2235 0 See Attachments Planned See Attachments 2/20/2013 1605-0607 0 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr 2/20/2013 1927-1929 0 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr 2/21/2013 0007-0008 0 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events <1 hr 2/21/2013 0008-0011 0 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr 2/21/2013 1905-1907 0 Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events <1 hr 2/21/2013 2057-2101 0 Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events < 1 hr 2/22/2013 0837-0841 0 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr 2/24/2013 1129-1131 0 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr Total Flare <=1 Hour 0 Total Flom .1 Hour Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTALFLARED 0 0 o o W d d d d N N N w N W m 9 9 A A 2 w 2 D iE n F T T T 'm N W m o o A A w iE n F T T m 3 N A zz o o w iE F w 3 w 1 ALASKA OIL AND GAS COMMISSION LISBURNE PRODUCTION CENTER #1 SBP EXPLORATION, ALASKA JPRUDHOf Disposition MCF 3. Conserv. Purposes Volume MCF` 1. Sold Commissioner Date 97,079 2. Reinjected 10,305,376 3. Flared or vented less than 1 hour. 0 4. Flared or vented greater than 1 hour (Supplemental report required—See 20 AAC 25.235 0 5. Pilot and Purge 11,547 6. Used for lease operations Fuel Assist 849,660 168,886 7. Other Lift Gas, Off Field 232,108 TOTAL items 1 - 7 11,664,656 8. NGL gas equivalent produced 97,079 9. Purchased gas 0 10. Transferred from: Ml from Prudhoe Fuel Gas from Prudhoe 1,020,277 1,787 11. Transferred to: 0 Remarks: I hereby ceti at �h/e�f�or rue and correct to the est f my�knyoJv/�I�edge. Signature: t�Y ll Title: L� ' 1I(�pate: /� I 4 13 Form 10-422 (Revised 4/95) BAY/PT MCINTYRE contribution of each pool to total. Pool Name I Code I Percent 640144 1 43.20% McIntyre 640180 1 49.13% k -Sap River test in GPMA 640147 1 0.46% Official Use Only—Flarina Authorization } 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Mar -13 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events <1 hr Total Flare <=1 Hour 0 Total Flare> 1 Hour Volume Flared Measured Safety Pilot 5,019 Continuous Assist 73,510 TOTALFLARED 78,529 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Mar -13 VOLUME PLANNED DATE TIME JMSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events <1 hr Total Flare <=1 Hour 0 Total Flare> 1 Hour Volume Flared Measured Safety Pilot 5,642 Continuous Assist 82,404 TOTAL FLARED 88,046 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Mar -13 VOLUME PLANNED DATE TIME (Ms<f( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events <1 hr Total Flare <= 1 Hour 0 Total Flare> 1 Hour Volume Flared Measured Safety Pilot 701 Continuous Assist 10,268 TOTAL FLARED 10,969 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Mar -13 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events <1 hr Total Flare <=1 Hour 0 Total Flom> I Hour Volume Flared Measured Safety Pilot 131 Continuous Assist 1,923 TOTAL FLARED 2,054 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Mar -13 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events <1 hr Total Flare <=1 Hour 0 Total Flare > 1 Hour Volume Flared Measured Safety Pilot 54 Contin nous Assist 781 TOTAL FLARED 83S BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Mar -13 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr Total Flare <= I Hour 0 Total Fiore > 1 Hour Volume Flared Measured Safety Pilot Continuous Assist TOTALFIARED 0 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Mar -13 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr Total Flom <=1 Hour 0 Total Flare > 1 Hour Volume Flared Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facilily Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator BP 5. MonthNear of Disposition I Aril -2013 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 101,051 Pool Name Pool Code Percent 7. Reinjected 9,804,988 Lisburne 640144 38.1% Niakuk 640148 1.1% 8. Flared or vented 1 hour or less 457 North Prudhoe Bay State 640152 0.0% Sadlerochit 640150 5.8% 9. Flared or vented more than 1 hour (see instr.) 0 Point McIntyre 640180 54.5% Ivishak-SagRiver test in 640147 0.5% 10. Pilot and Purge 11,170 West Beach 640186 0.0% 11. Assist Gas 190,459 12. Fuel gas used in lease operations. 788,539 13. Other (see instructions) 252,178 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6.12) 11,148,842 Lease Use MCF 15. NGL Gas Equivalent 101,051 Conservation MCF 16. Purchased gas U Waste: MCF 17. Transferred from: 1,157,769 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,154,798 and Fuel Gas from Prudhoe = 2,971 1 hereby certify that the foregoing is true and correct to the best of my knowledge. U U i/)z Note: All volumes must be corrected Signature b/( uG 4 4� L( GZi�/ Title Maria er Production Taxes and Ro Ities Alaska to pressure of 14.65 psis and to a 1 ,3 temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date AAC25.235. Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Apr -13 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 4/8/2013 0426-0447 40 Not required for Unplanned events <1 hr 4/11/2013 2250-2254 92 Not required for Unplanned events <1 hr 4/12/2013 0224-0228 9 1808 Turbine shutdown for maintenance 4/12/2013 1744-1459 9 1808 Turbine restart after wash fail to start Total Flare <=1 Hour 150 Total Flare> 1 Hour 0 Volume Flared 150 Measured Safety Pilot 4,258 Continuous Assist 72,473 TOTALFLARED 76,881 Unplanned Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr Planned Depressured Planned Shutdown and depressured BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Apr -13 VOLUME PLANNED _ DATE TIME )MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 4/8/2013 0426-0447 71 4/11/2013 2250-2254 178 4/12/2013 0224-0228 IS 4/12/2013 1744-1459 12 Total Flare c= 1 Hour 276 Total Flom> 1 Hour 0 Volume Flared 276 Measured Safety Pilot 6,089 Continuous Assist 104,146 TOTAL FLARED 110,531 Not required for Unplanned events < 1 hr Not required for Unplanned events < 1 hr 1808 Turbine shutdown for maintenance 1808 Turbine restart after wash fail to start Unplanned Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events c 1 hr Planned Depressured Planned Shutdown and depressured BP EXPLORATION ALASKA, INC, :ONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Apr -13 VOLUME PLANNED DATE TIME (Mmf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 4/8/2013 0426-0447 4/11/2013 2250-2254 4/12/2013 0224-0228 4/12/2013 1744-1459 Total Flom <=1 Hour 6 Total Flom> 1 Hour 0 Volume Flared 6 Measured Safety Pilot 133 Continuous Assist 2,328 TOTAL FLARED 2,467 Not required for Unplanned events < 1 hr Not required for Unplanned events < 1 hr 1808 Turbine shutdown for maintenance 1808 Turbine restart after wash fail to start Unplanned Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events <1 hr Planned Depressured Planned Shutdown and depressured RP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Apr -13 VOLUME PLANNED DATE TIME )Msd) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 4/8/2013 0426-0447 4/11/2013 2250-2254 4/12/2013 0224-0228 4/12/2013 1744-1459 Total Flare <=1 Hour 3 Total Flare > 1 Hour Volume Flared Measured Safety Pilot 60 Continuous Assist 1,044 TOTAL FLARED 1,107 Not required for Unplanned events <1 hr Not required for Unplanned events <1 hr 1808 Turbine shutdown for maintenance 1808 Turbine restart after wash fail to start Unplanned Not required for Unplanned events <I hr Unplanned Not required for Unplanned events <I hr Planned Depressured Planned Shutdown and depressured BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Apr -13 VOLUME PLANNED DATE TIME (Msof( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 4/8/2013 0426-0447 7 4/11/2013 2250-2254 16 4/12/2013 0224-0228 0 4/12/2013 1744-1459 0 Total Flare <=1 Hour 23 Total Flare, 1 Hour 0 Volume Flared 23 Measured Safety Pilot 630 Continuous Assist 10,468 TOTAL FLARED 11,121 Not required for Unplanned events < 1 hr Not required for Unplanned events < 1 hr 1808 Turbine shutdown for maintenance 1808 Turbine restart after wash fail to start Unplanned Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events <1 hr Planned Depressured Planned Shutdown and depressured BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Apr -13 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 4/8/2013 0426-0447 4/11/2013 2250-2254 4/12/2013 0224-0228 4/12/2013 1744-1459 Total Flom <=1 Hour 0 Total Flom> 1 Hour Volume Flared Measured Safety Pilot Continuous Assist TOTALFLARED 0 Not required for Unplanned events < 1 hr Not required for Unplanned events < 1 hr 1808 Turbine shutdown for maintenance 1808 Turbine restart after wash fail to start Unplanned Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr Planned Depressured Planned Shutdown and depressured BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Apr -13 VOLUME PLANNED DATE TIME (MSCF( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 4/8/2013 0426-0447 4/11/2013 2250-2254 4/12/2013 0224-0228 4/12/2013 1744-1459 Total Flare <=1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 Not required for Unplanned events < 1 hr Not required for Unplanned events < 1 hr 1808 Turbine shutdown for maintenance 1808 Turbine restart after wash fail to start Unplanned Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events <I hr Planned Depressured Planned Shutdown and depressured STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator BP 5. Month/year of Disposition Ma -2013 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 104,201 Pool Name Pool Code Percent 7. Reinjected 9,382,873 Lisburne 640144 43.6% Niakuk 640148 1.1% 8. Flared orvented 1 houror less 276 North Prudhoe Bay State 640152 0.0% Sadlerochit 640150 5.2% 9. Flared or vented more than 1 hour (see Iran.) 0 Point McIntyre 640180 49.6% Ivishak-SagRiver test in 640147 0.5% 10. Pilot and Purge 11,513 West Beach 640186 0.0% 11. Assist Gas 187,128 12. Fuel gas used in lease operations. 818,185 13. Other (see instructions) 203,912 Official Use On fy Authorization 11 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 10,708,08$ Lease Use MCF 15. NGL Gas Equivalent 104,201 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 1,219,464 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,218,873 and Fuel Gas from Prudhoe = 591 1 hereby certify that he foregoing/ifs true and correct to the best of my knowledge. yjn /l�I Note: All volumes must be corrected Signature II LC 1, Title Mana er Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date�ln AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number2. 0290000009 Facility Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator BP 5. Month/year of Disposition June -2013 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume, 6. Sold 75,796 Pool Name Pool Code Percent 7. Reinjected 8,552,528 Lisburne 640144 41.6% Niakuk 640148 1.4% 8. Flared or vented 1 hour or less 315 North Prudhoe Bay State 640152 0.0% Sadlerochit 640150 5.5% 9. Flared or vented more than 1 hour (see instr.) 0 Point McIntyre 640180 51.0% Ivishak-SagRiver test in 640147 0.5% 10. Pilot and Purge 11,120 West Beach 640186 0.0% 11. Assist Gas 156,987 12. Fuel gas used in lease operations. 737,947 13. Other (see instructions) 209,908 Official Use Only authorization>1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 9,744,601 Lease Use MCF 15. NGL Gas Equivalent 75,796 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 1,050,187 18. Transferred to: (Express as a negative #) 0 Commissioner Date 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,050,187 and Fuel Gas from Prudhoe = 0 1 hereby certify that the foregoing is true d correct to the best of my knowledge. AA// -- Note: All volumes must be corrected Signature �/ la= �� �rA+n+1; E.O� Tide Mana er Production Taxes and Ro alties Alaska to pressure of 14.65 psia and t0 a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date ri ZO! AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator BP 5. MonthNear of Disposition I July -2013 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 81,544 Pool Name Pool Code Percent 7. Reinjected 8,718,369 Lisburne 640144 42.5% Niakuk 640148 1.4% 8. Flared or vented 1 hour or less 0 North Prudhoe Bay State 640152 0.0% Sadlerochit 640150 5.5% 9. Flared or vented more than 1 hour (see instr.) 0 Point McIntyre 640180 50.1% Ivishak-SagRiver test in 640147 0.6% 10. Pilot and Purge 11,417 West Beach 640186 0.0% 11. Assist Gas 148,556 12. Fuel gas used in lease operations. 773,841 13. Other (see instructions) 191,237 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 9,924,964 Lease Use MCF 15. NGL Gas Equivalent 81,544 Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: 987,426 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 987,426 and Fuel Gas from Prudhoe = 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. y u1nA Note: All volumes must corrected Signaturena/� tk Title Mana er Production Taxes and Royalties Alaska f0 pressure Of 14.65 psisis and t0 a / temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date / AAC25.235. Form 10-022 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name PBU LA=NE PROD GPMA 3, Field PBU - GPMA 4. Operator BP 5. Month/year of Disposition August -2013 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 74,926 Pool Name PoolCode Percent 7. Reinjected 8,104,719 (Lisburne 640144 43.7% Niakuk 640148 1.0% 8. Flared or vented 1 hour or less 1,016 North Prudhoe Bay State 640152 0.0% Sadlerochit 640150 5.4% 9. Flared or vented more than 1 hour (see instr.) 2,768 Point McIntyre 640180 49.1% Ivishak-SagRiver test in 640147 0.8% 10. Pilot and Purge 11,499 West Beach 640186 0.0% 11. Assist Gas 156,667 12. Fuel gas used in lease operations. 688,336 13. Other (see instructions) 159,675 Official Use Only Authorization >1 he Safety D Z �(o D MCF 14. TOTAL VOLUME (ITEMS 6-12) 9,199,606 Lease Use MCF 15, NGL Gas Equivalent 74,926 Conservation MCF 16. Purchased gas p Waste: MCF 17. Transferred from: 1,132,344 _ /f Commissioner Date 18. Transferred to: (Express as a negative #) p 19. Remarks: Block 13: Lift Gas Off Field; block 17: MI from Prudhoe = 1,124,984 and Fuel Gas from Prudhoe = 7,360 I hereby certify that th foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature 1. f Title Mana er Production Taxes and R aloes Alaska to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date / AAC25.235. V,1-1-- & /,7 J) 4 - Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 DATE TIME VOLUME (MSCF) PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug -13 DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 8/8/2013 0322-0327 157 Not required for Unplanned events <1 hr Planned Not required for Unplanned events <I hr 8/8/2013 1902-1905 97 Not required for Unplanned events < 1 hr Planned Not required for Unplanned events < 1 hr 8/8/2013 1928-1930 I Not required for Unplanned events < 1 hr Planned Not required for Unplanned events < 1 hr 8/11/2013 0002-0002 2 Not required for Unplanned events < 1 hr Planned Not required for Unplanned events < 1 hr 8/12/2013 2008-2009 7 Not required for Unplanned events < 1 hr Planned Not required for Unplanned events < 1 hr 8/13/2013 0124-0128 93 Not required for Unplanned events < 1 hr Planned Not required for Unplanned events < 1 hr 8/19/2013 0105-0130 86 Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events < 1 hr Total Flare <a 1 Hour 443 1,294 GPMA Planned Shutdown- Vented East Side Pipelines for 8/8/2013 1954-2150 Drillsite Maintenance Work. Planned Depressured. 41 GPMA August Shutdown - Plant start-up, started 1808 Increased Row rates into the facility and 8/10/2013 2148-2359 Reinjection Compressor. Planned began loading compressor. Total Flare> 1 Hour 1,335 Volume Flared 1,778 Measured Safety Pilot 4,651 Continuous Assist 67,821 TOTAL FLARED 74,250 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug -13 Total Flom <=1 Hour 408 507 08/08/13 1954-2150 GPMA Planned Shutdown- Vented East Side Pipelines for Drill Planned 369 08/10/13 2148-2359 GPMA August Shutdown - Plantstart-up, started 1808 Reinjec Planned Total Flom> I Hour 876 VOLUME 1,284 Measured Safety Pilot PLANNED Continuous Assist DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 8/8/2013 0322-0327 63 Not required for Unplanned events < 1 hr Planned Not required for Unplanned events < 1 hr 8/8/2013 1902-1905 37 Not required for Unplanned events <1 hr Planned Not required for Unplanned events <I hr 8/8/2013 1928-1930 1 Not required for Unplanned events < 1 hr Planned Not required for Unplanned events <1 hr 8/11/2013 0002-0002 20 Not required for Unplanned events < 1 hr Planned Not required for Unplanned events <1 hr 8/12/2013 2008-2009 57 Not required for Unplanned events < 1 hr Planned Not required for Unplanned events <1 hr 8/13/2013 0124-0128 141 Not required for Unplanned events < 1 hr Planned Not required for Unplanned events < 1 hr 8/19/2013 0105-0130 89 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr Total Flom <=1 Hour 408 507 08/08/13 1954-2150 GPMA Planned Shutdown- Vented East Side Pipelines for Drill Planned 369 08/10/13 2148-2359 GPMA August Shutdown - Plantstart-up, started 1808 Reinjec Planned Total Flom> I Hour 876 Volume Flared 1,284 Measured Safety Pilot 5,777 Continuous Assist 76,305 TOTALFLARED 83,366 Depressured. Increased flow rates into the facility and begat BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO, 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug -13 Total Flom <=1 Hour 4 22 08/08/13 1954-2150 GPMA Planned Shutdown - Vented East Side Pipelines for Drill Planned 0 08/10/13 2148-2359 GPMA August Shutdown - Plant start-up, started 1808 Reinter Planned Total Flare > 1 Hour 22 Volume Flared 26 Measured Safety Pilot 104 Continuous Assist 1,532 TOTAL FLARED 1,662 Depressured. Increased flow rates into the facility and bega VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 8/8/2013 0322-0327 1 Not required for Unplanned events <1 hr Planned Not required for Unplanned events < 1 hr 8/8/2013 1902-1905 1 Not required for Unplanned events <1 hr Planned Not required for Unplanned events <1 hr 8/8/2013 1928-1930 0 Not required for Unplanned events <1 hr Planned Not required for Unplanned events< 1 hr 8/11/2013 0002-0002 0 Not required for Unplanned events <1 hr Planned Not required for Unplanned events < 1 hr 8/12/2013 2008-2009 0 Not required for Unplanned events <1 hr Planned Not required for Unplanned events < 1 hr 8/13/2013 0124-0128 1 Not required for Unplanned events <1 hr Planned Not required for Unplanned events < 1 hr 8/19/2013 0105-0130 1 Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events <1 hr Total Flom <=1 Hour 4 22 08/08/13 1954-2150 GPMA Planned Shutdown - Vented East Side Pipelines for Drill Planned 0 08/10/13 2148-2359 GPMA August Shutdown - Plant start-up, started 1808 Reinter Planned Total Flare > 1 Hour 22 Volume Flared 26 Measured Safety Pilot 104 Continuous Assist 1,532 TOTAL FLARED 1,662 Depressured. Increased flow rates into the facility and bega BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug -13 Total Flare <=1 Hour 4 3 08/08/13 1954-2150 GPMA Planned Shutdown- Vented East Side Pipelines for Drill Planned 0 08/10/13 2148-2359 GPMA August Shutdown - Plant start-up, started 1808 Reinjec Planned Total Flare> 1 Hour 3 Volume Flared 7 Measured Safety Pilot 84 Continuous Assist 1,215 TOTAL FLARED 1,306 Depressured. Increased flow rates into the facility and bega VOLUME PLANNED DATE TIME jMnq DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 8/8/2013 0322-0327 0 Not required for Unplanned events < i hr Planned Not required for Unplanned events < 1 hr 8/8/2013 1902-1905 0 Not required for Unplanned events < 1 hr Planned Not required for Unplanned events < 1 hr 8/8/2013 1928-1930 0 Not required for Unplanned events < 1 hr Planned Not required for Unplanned events < 1 hr 8/11/2013 0002-0002 0 Not required for Unplanned events < 1 hr Planned Not required for Unplanned events < 1 hr 8/12/2013 2008-2009 0 Not required for Unplanned events < 1 hr Planned Not required for Unplanned events < 1 hr 8/13/2013 0124-0128 2 Not required for Unplanned events <I hr Planned Not required for Unplanned events <I hr 8/19/2013 0105-0130 2 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr Total Flare <=1 Hour 4 3 08/08/13 1954-2150 GPMA Planned Shutdown- Vented East Side Pipelines for Drill Planned 0 08/10/13 2148-2359 GPMA August Shutdown - Plant start-up, started 1808 Reinjec Planned Total Flare> 1 Hour 3 Volume Flared 7 Measured Safety Pilot 84 Continuous Assist 1,215 TOTAL FLARED 1,306 Depressured. Increased flow rates into the facility and bega BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug -13 Total Flare <= i Hour 157 373 08/08/13 1954-2150 159 08/10/13 2148-2359 Total Flare> I Hour 532 Volume Flared 689 Measured Safety Pilot 883 Continuous Assist 9,794 TOTALFLARED 11,366 GPMA Planned Shutdown - Vented East Side Pipelines for Drillsi Planned GPMA August Shutdown - Plant start-up, started 1808 Reinjecth Planned Depressured. Increased flow rates into the facility and began loading co VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 8/8/2013 0322-0327 45 Not required for Unplanned events< 1 hr Planned Not required for Unplanned events <1 hr 8/8/2013 1902-1905 29 Not required for Unplanned events< 1 hr Planned Not required for Unplanned events <I hr 8/8/2013 1928-1930 0 Not required for Unplanned events <I hr Planned Not required for Unplanned events <1 hr 8/11/2013 0002-0002 9 Not required for Unplanned events < 1 hr Planned Not required for Unplanned events < 1 hr 8/12/2013 2008-2009 20 Not required for Unplanned events < 1 hr Planned Not required for Unplanned events <1 hr 8/13/2013 0124-0128 45 Not required for Unplanned events <1 hr Planned Not required for Unplanned events <I hr 8/19/2013 0105-0130 9 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events <1 hr Total Flare <= i Hour 157 373 08/08/13 1954-2150 159 08/10/13 2148-2359 Total Flare> I Hour 532 Volume Flared 689 Measured Safety Pilot 883 Continuous Assist 9,794 TOTALFLARED 11,366 GPMA Planned Shutdown - Vented East Side Pipelines for Drillsi Planned GPMA August Shutdown - Plant start-up, started 1808 Reinjecth Planned Depressured. Increased flow rates into the facility and began loading co BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug -13 Total Flare r-1 Hour 0 0 08/08/13 1954-2150 0 08/10/13 2148-2359 Total Flare > 1 Hour 0 VOLUME 0 PLANNED 0 DATE TIME (MSCF) DESCRIPTION OF INCIDENTS& CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 8/8/2013 0322-0327 0 Not required for Unplanned events < 1 hr Planned Not required for Unplanned events <1 hr 8/8/2013 1902-1905 0 Not required for Unplanned events < 1 hr Planned Not required for Unplanned events <1 hr 8/8/2013 1928-1930 0 Not required for Unplanned events < 1 hr Planned Not required for Unplanned events <1 hr 8/11/2013 0002-0002 0 Not required for Unplanned events < 1 hr Planned Not required for Unplanned events <1 hr 8/12/2013 2008-2009 0 Not required for Unplanned events < 1 hr Planned Not required for Unplanned events <1 hr 8/13/2013 0124-0128 0 Not required for Unplanned events < 1 hr Planned Not required for Unplanned events <1 hr 8/19/2013 0105-0130 0 Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events <1 hr Total Flare r-1 Hour 0 0 08/08/13 1954-2150 0 08/10/13 2148-2359 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 GPMA Planned Shutdown- Vented East Side Pipelines for Drill Planned Depressured. GPMA August Shutdown - Plant start-up, started 1808 Reinjec Planned Increased flow rates into the facility and bega BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug -13 Total Flare <=1 Hour 0 0 VOLUME PLANNED 0 DATE TIME (MSCF( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Measured Safety Pilot 0 Continuous Assist 0 TOTALFLARED 0 8/8/2013 0322-0327 0 Not required for Unplanned events < 1 hr Planned Not required for Unplanned events < 1 hr 8/8/2013 1902-1905 0 Not required for Unplanned events <1 hr Planned Not required for Unplanned events < 1 hr 8/8/2013 1928-1930 0 Not required for Unplanned events <1 hr Planned Not required for Unplanned events < 1 hr 8/11/2013 0002-0002 0 Not required for Unplanned events <1 hr Planned Not required for Unplanned events <1 hr 8/12/2013 2008-2009 0 Not required for Unplanned events <1 hr Planned Not required for Unplanned events <1 hr 8/13/2013 0124-0128 0 Not required for Unplanned events <1 hr Planned Not required for Unplanned events <1 hr 8/19/2013 0105-0130 0 Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events <1 hr Total Flare <=1 Hour 0 GPMA Planned Shutdown -Vented East Side Pipelines for Drill Planned Depressured. GPMA August Shutdown - Plant start-up, started 1808 Reinjec Planned Increased flow rates into the facility and begat 0 08/08/13 1954-2150 0 08/10/13 2148-2359 Total Flare> 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTALFLARED 0 GPMA Planned Shutdown -Vented East Side Pipelines for Drill Planned Depressured. GPMA August Shutdown - Plant start-up, started 1808 Reinjec Planned Increased flow rates into the facility and begat STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name P13 LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator BP 5. Month/Vear of Disposition mber-2013 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 67,286 Pool Name Pool Code Percent 7. Reinjected 9,954,535 Lisburne 640144 39.9% Niakuk 640148 1.1% 8. Flared or vented 1 hour or less 524 North Prudhoe Bay State 640152 0.0% Sadlerochit 640150 4.1% 9. Flared or vented more than 1 hour (see instr.) 0 Point McIntyre 640180 54.2% lvishak-Saq River test in 640147 0.8% 10. Pilotand Purge 11,125 West Beach 640186 0.0% 11. Assist Gas 189,786 12. Fuel gas used in lease operations. 771,095 13. Other (see instructions) 251,846 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6.12) 11,266,197 Lease Use MCF 15. NGL Gas Equivalent 87,286 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 1,837,048 Commissioner Date 18. Transferred to: (Express as a negative #) 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,837,048 and Fuel Gas from Prudhoe = 0 1 hereby certify thattheforegoing is true �annd1 correct to the best of my knowledge. Note: All volumes must be corrected Signature ("le_ L.h1�X Title Mana er Production Taxes and Ro allies Alaska to pressure of 14.65 psis and to a Printed Name Diane Colleytemperature of 60o F. Authority 20 Phone (907) 564-5775 Date AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator BP 5. MonthNear of Disposition I October -2013 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 103,017 Pool Name Pool Code Percent 7. Reinjected 10,703,593 Lisburne 640144 36.3% Niakuk 640148 0.8% 8. Flared or vented 1 hour or less 0 North Prudhoe Bay State 640152 0.0% Sadlerochit 640150 4.0% 9. Flared or vented more than 1 hour (see insh.) 0 Point McIntyre 640180 58.3% Ivishak-SagRiver test in 640147 0.6% 10. Pilot and Purge 11,487 West Beach 640186 0.0% 11. Assist Gas 186,466 12. Fuel gas used in lease operations. 816,498 13. Other (see instructions) 393,600 Official Use Only Authorization>1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 12,214,661 Lease Use MCF 15. NGL Gas Equivalent 103,017 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 1,821,214 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,813,758 and Fuel Gas from Prudhoe = 7,456 1 hereby certify that t foregoing is true and correct to the best of my knowledge. Y le/Dbin Note: All volumes must be corrected Signature Title Mana er Production Taxes an Ro alties Alaska t0 pressure of 14.65 psia and to a / /J temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date ± AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator BP 5. Month/Year of Disposition November -2013 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 104,434 Pool Name Pool Code Percent 7. Reinjected 10,004,653 Lisburne 640144 29.0% Niakuk 640148 0.5% 8. Flared or vented 1 hour or less 0 North Prudhoe Bay State 640152 0.0% Sadlerochit 640150 11.0% 9. Flared or vented more than 1 hour (sea instr.) 0 Point McIntyre 640180 59.1% Ivishak-SagRiver test in 640147 0.4% 10. Pilot and Purge 11,171 Vilest Beach 640186 0.0% 11. Assist Gas 146,954 12. Fuel gas used in lease operations. 823,940 13. Other (see instructions) 278,082 Official Use Only Authorization >7 he Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 11,369,234 Lease Use MCF 15. NGL Gas Equivalent 104,434 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 1,060,683 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 13: Lift Gas Off Field; Block 17: Ml from Prudhoe = 1,060,616 and Fuel Gas from Prudhoe = 67 Eherebe at a foregoing is true and comectto the best of my knowledge.Note: Title Mana er Production Taxes and Ro alties Alaska All volumes must be corrected tO pressure Of 14.65 Asia and to a temperature of 60o F. Authority 20 AAC25.235. Diane Colley Phone (907) 564-5775 Date Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator BP 5. Monthfyear of Disposition December -2013 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 103,569 Pool Name Pool Code Percent 7. Reinjected 10,277,589 Lisburne 640144 27.7% Niakuk 640148 0.8% 8. Flared or vented 1 hour or less 471 North Prudhoe Bay State 640152 0.0% Sadlerochit 640150 10.7% 9. Flared or vented more than 1 hour (see instr.) 0 Point McIntyre 640180 60.2% lvishak-Saa River test in 640147 0.7% 10. Pilot and Purge 11,565 West Beach 640186 0.0% 11. Assist Gas 166,788 12. Fuel gas used in lease operations. 832,552 13. Other (see instructions) 353,480 Official Use OnlyMCF Authorization >1 hr: Safety 14. TOTAL VOLUME (ITEMS 6.12) 11,746,014 Lease Use MCF 15. NGL Gas Equivalent 103,569 Conservation MCF 16. Purchased gas U Waste: MCF 17. Transferred from: 1,422,950 Commissioner Date 18. Transferred to: (Express as a negative ff) 0 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,415,222 and Fuel Gas from Prudhoe = 7,728 1 hereby certify that the foregoing is true and correct to the best of my knowledge. �/U Note: All volumes must be corrected Signature fGL iN' Title Mana er Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date L/ AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate