Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutPBU Lisburne Prod (GPMA) Gas DispositionState of Alaska AOGC C
Gas Disposition Files
Year: 2013
Facility: PBU Lisburne Prod (GPMA)
Operator: BP EXPLORATION (ALASKA)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DiSPORITinN
1. Facility Number2. Facility Name
0290000009 PBU LISBURNE PROD (GPMA)
Disposition
3. Field
PBU - GPMA
Volume MCF
4. Operator •5. Monthfyear of Disposition
BP Janua -2013
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
106,002
Pool Name Pool Code Percent
7, Reinjected
10,854,743
Lisburne 640144 33.7%
Niakuk 640148 0.8%
8. Flared or vented 1 hour or less
210
North Prudhoe Bay State 640152 0.0%
Sadlerochit 640150 6.6%
9. Flared or vented more than 1 hour (see instr.)
0
Point McIntyre 640180 58.5%
Ivishak-SagRiver test in 640147 0.4%
10. Pilot and Purge
12,007
West Beach 1 640186 0.0%
11. Assist Gas
143,898
12. Fuel gas used in lease operations.
910,600
13. Other (see instructions)
298 998Official
Use Only
Authorization>1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
12,326,458
Lease Use
MCF
15. NGL Gas Equivalent
106,002
Conservation
MCF
16. Purchased gas
�
waste:
MCF
17. Transferred from:
1,095,980
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,095,980 and Fuel Gas from Prudhoe = 0
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Man a er Production Taxes and Ro allies Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date 2) AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION ALASKA, INC,
:ONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan -13
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
1/27/2013 2329-2359 69 Not required for Unplanned events < 1 hr
Total Flare <=1 Hour 69
Total Flare > 1 Hour 0
Volume Flared 69
Measured Safety Pilot 4,050
Continuous Assist 48.595
TOTALFLARED 52,714
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned Not required for Unplanned events < 1 hr
VOLUME
DATE TIME
1/27/2013 2329-2359 2
Total Flare <=1 Hour 2
Total Flare> 1 Hour 0
Volume Flared 2
Measured Safety Pilot 96
Continuous Assist 1,147
TOTAL FLARED 1,245
BP EXPLORATION ALASKA, INC,
:ONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan -13
DESCRIPTION OF INCIDENTS & CAUSE
Not required for Unplanned events < 1 hr
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned Not required for Unplanned events < 1 hr
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan -13
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
1/27/2013 2329-2359 124 Not required for Unplanned events < 1 hr
Total Flare <=1 Hour 124
Total Flare > 1 Hour 0
Volume Flared 124
Measured Safety Pilot 7,028
Continuous Assist 84,165
TOTAL FLARED 91,317
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned Not required for Unplanned events < 1 hr
VOLUME
DATE TIME
1/27/2013 2329-2359 14
Total Flare <= 1 Hour 14
Total Flare > 1 Hour 0
Volume Flared 14
Measured Safety Pilot 787
Continuous Assist 9,441
TOTAL FLARED 10,242
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan -13
DESCRIPTION OF INCIDENTS & CAUSE
Not required for Unplanned events < 1 hr
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned Not required for Unplanned events < 1 hr
VOLUME
DATE TIME
1/27/2013 2329-2359 1
Total Flare <=1 Hour 1
Total Flare > 1 Hour 0
Volume Flared 1
Measured Safety Pilot 46
Continuous Assist 550
TOTAL FLARED 597
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan -13
DESCRIPTION OF INCIDENTS & CAUSE
Not required for Unplanned events < 1 hr
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned Not required for Unplanned events < 1 hr
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan -13
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
1/27/2013 2329-2359 0
Total Flare <=1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Not required for Unplanned events < 1 hr
Unplanned Not required for Unplanned events < 1 hr
VOLUME
DATE TIME
1/27/2013 2329-2359 0
Total Flare <=1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTALFLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan -13
DESCRIPTION OF INCIDENTS & CAUSE
Not required for Unplanned events < 1 hr
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned Not required for Unplanned events < 1 hr
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. MonthNear of Disposition
I February -2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
68,313
Pool Name Pool Code Percent
7. Reinjected
6,287,005
Lisburne 640144 40.83/6
Niakuk 640148 2.1%
8. Flared or vented 1 hour or less
1,847
North Prudhoe Bay State 640152 0.0%
Sadlerochit 640150 2.5%
9. Flared or vented more than 1 hour (see insh.)
0
Point McIntyre 640180 53.9%
Ivishak-Saq River test in 640147 0.7%
10. PilotandPurge
10,839
West Beach 640186 0.0%
11. Assist Gas
145,028
12. Fuel gas used in lease operations.
641,526
13. Other (see instructions)
267,997
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
7,422,555
Lease Use
MCF
15. NGL Gas Equivalent
68,313
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
992,210
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 991,205 and Fuel Gas from Prudhoe = 1,005
1 hereby certify that the foregoing is We and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Manager Production Taxes and Rove ties Alaska t0 pressure Of 14.65 psia and to a
/ temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Total Flom <=1 Hour 972
Total Flare> 1 Hour
Volume Flared 972
Measured Safety Pilot 4,998
Continuous Assist 68,079
TOTALFLARED 74,049
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER N0. 219
PRUDHOE RAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb -13
VOLUME
PLANNED
DATE
TIME
(MSCF(
DESCRIPTION OF INCIDENTS & CAUSE
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
2/1/2013
1357-1439
95
Not required for Unplanned events < 1 hr
Unplanned
Not required for Unplanned events < 1 hr
2/14/2013
1731-1735
115
See Attachments
Planned
See Attachments
2/14/2013
2057-2058
12
See Attachments
Planned
See Attachments
2/18/2013
2226-2235
9
Not required for Unplanned events <1 hr
Unplanned
Not required for Unplanned events < 1 hr
2/19/2013
0848-0849
2
See Attachments
Planned
See Attachments
2/19/2013
1510-1511
14
See Attachments
Planned
See Attachments
2/19/2013
1649-1650
49
See Attachments
Planned
See Attachments
2/19/2013
2125-2127
52
See Attachments
Planned
See Attachments
2/19/2013
2226-2235
10
See Attachments
Planned
See Attachments
2/20/2013
1605-0607
53
Not required for Unplanned events < 1 hr
Unplanned
Not required for Unplanned events < 1 hr
2/20/2013
1927-1929
56
Not required for Unplanned events < 1 hr
Unplanned
Not required for Unplanned events < 1 hr
2/21/2013
0007-0008
4
Not required for Unplanned events < 1 hr
Unplanned
Not required for Unplanned events < 1 hr
2/21/2013
0008-0011
80
Not required for Unplanned events <1 hr
Unplanned
Not required for Unplanned events < 1 hr
2/21/2013
1905-1907
28
Not required for Unplanned events <1 hr
Unplanned
Not required for Unplanned events < 1 hr
2/21/2013
2057-2101
169
Not required for Unplanned events <1 hr
Unplanned
Not required for Unplanned events <1 hr
2/22/2013
0837-0841
173
Not required for Unplanned events <1 hr
Unplanned
Not required for Unplanned events <1 hr
2/24/2013
1129-1131
51
Not required for Unplanned events <1 hr
Unplanned
Not required for Unplanned events <1 hr
Total Flom <=1 Hour 972
Total Flare> 1 Hour
Volume Flared 972
Measured Safety Pilot 4,998
Continuous Assist 68,079
TOTALFLARED 74,049
BP EXPLORATION ALASKA, INC,
:ONSERVATION ORDER NO. 219
DATE
TIME
VOLUME
fMscf)
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb -13
DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
2/1/2013
1357-1439
3
Not required for Unplanned events <1 hr
Unplanned
Not required for Unplanned events <1 hr
2/14/2013
1731-1735
6
See Attachments
Planned
See Attachments
2/14/2013
2057-2058
1
See Attachments
Planned
See Attachments
2/18/2013
2226-2235
1
Not required for Unplanned events< S hr
Unplanned
Not required for Unplanned events <1 hr
2/19/2013
0848-0849
0
See Attachments
Planned
See Attachments
2/19/2013
1510-1511
1
See Attachments
Planned
See Attachments
2/19/2013
1649-1650
3
See Attachments
Planned
See Attachments
2/19/2013
2125-2127
3
See Attachments
Planned
See Attachments
2/19/2013
2226-2235
1
See Attachments
Planned
See Attachments
2/20/2013
1605-0607
4
Not required for Unplanned events <1 hr
Unplanned
Not required for Unplanned events <1 hr
2/20/2013
1927-1929
4
Not required for Unplanned events <1 hr
Unplanned
Not required for Unplanned events <1 hr
2/21/2013
0007-0008
0
Not required for Unplanned events <1 hr
Unplanned
Not required for Unplanned events <1 hr
2/21/2013
0008-0011
5
Not required for Unplanned events < 1 hr
Unplanned
Not required for Unplanned events < 1 hr
2/21/2013
1905-1907
2
Not required for Unplanned events < 1 hr
Unplanned
Not required for Unplanned events <1 hr
2/21/2013
2057-2101
11
Not required for Unplanned events < 1 hr
Unplanned
Not required for Unplanned events <1 hr
2/22/2013
0837-0841
12
Not required for Unplanned events < 1 hr
Unplanned
Not required for Unplanned events < 1 hr
2/24/2013
1129-1131
3
Not required for Unplanned events < 1 hr
Unplanned
Not required for Unplanned events < 1 hr
Total Flare <=1 Hour 60
Total Flom> 1 Hour
Volume Flared 60
Measured Safety Pilot 293
Continuous Assist 3,925
TOTAL FLARED 4,278
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
DATE
TIME
VOLUME
(MSCF)
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb -13
DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
2/1/2013
1357-1439
192
Not required for Unplanned events <1
hr
Unplanned
Not required for Unplanned events < 1
hr
2/14/2013
1731-1735
177
See Attachments
Planned
See Attachments
2/14/2013
2057-2058
19
See Attachments
Planned
See Attachments
2/18/2013
2226-2235
6
Not required for Unplanned events <1
hr
Unplanned
Not required for Unplanned events <1
hr
2/19/2013
0848-0849
2
See Attachments
Planned
See Attachments
2/19/2013
1510-1511
7
See Attachments
Planned
See Attachments
2/19/2013
1649-1650
25
See Attachments
Planned
See Attachments
2/19/2013
2125-2127
26
See Attachments
Planned
See Attachments
2/19/2013
2226-2235
5
See Attachments
Planned
See Attachments
2/20/2013
1605-0607
27
Not required for Unplanned events < 1
hr
Unplanned
Not required for Unplanned events < 1
hr
2/20/2013
1927-1929
28
Not required for Unplanned events < 1
hr
Unplanned
Not required for Unplanned events <1
hr
2/21/2013
0007-0008
2
Not required for Unplanned events < 1
hr
Unplanned
Not required for Unplanned events <1
hr
2/21/2013
0008-0011
42
Not required for Unplanned events < 1
hr
Unplanned
Not required for Unplanned events < 1
hr
2/21/2013
1905-1907
14
Not required for Unplanned events < 1
hr
Unplanned
Not required for Unplanned events < 1
hr
2/21/2013
2057-2101
88
Not required for Unplanned events < 1
hr
Unplanned
Not required for Unplanned events < 1
hr
2/22/2013
0837-0841
90
Not required for Unplanned events <1
hr
Unplanned
Not required for Unplanned events < 1
hr
2/24/2013
1129-1131
26
Not required for Unplanned events < 1
hr
Unplanned
Not required for Unplanned events < 1
hr
Total Flare <=1 Hour 776
Total Flare> 1 Hour
Volume Flared 776
Measured Safety Pilot 5,277
Continuous Assist 69,338
TOTAL FLARED 75,391
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 229
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb -13
DATE
TIME
VOLUME
(Mscf(
DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
2/1/2013
1357-1439
20
Not required for Unplanned events <1
hr Unplanned
Not required for Unplanned
events <1 hr
2/14/2013
1731-1735
0
See Attachments
Planned
See Attachments
2/14/2013
2057-2058
0
See Attachments
Planned
See Attachments
2/18/2013
2226-2235
0
Not required for Unplanned events < 1
hr Unplanned
Not required for Unplanned
events < 1 hr
2/19/2013
0848-0849
0
See Attachments
Planned
See Attachments
2/19/2013
1510-1511
0
See Attachments
Planned
See Attachments
2/19/2013
1649-1650
0
See Attachments
Planned
See Attachments
2/19/2013
2125-2127
0
See Attachments
Planned
See Attachments
2/19/2013
2226-2235
0
See Attachments
Planned
See Attachments
2/20/2013
1605-0607
0
Not required for Unplanned events < 1
hr Unplanned
Not required for Unplanned
events <1 hr
2/20/2013
1927-1929
0
Not required for Unplanned events <I
hr Unplanned
Not required for Unplanned
events <I hr
2/21/2013
0007-0008
0
Not required for Unplanned events <I
hr Unplanned
Not required for Unplanned
events <I hr
2/21/2013
0008-0011
0
Not required for Unplanned events <I
hr Unplanned
Not required for Unplanned
events <I hr
2/21/2013
1905-1907
0
Not required for Unplanned events < 1
hr Unplanned
Not required for Unplanned
events < 1 hr
2/21/2013
2057-2101
0
Not required for Unplanned events <1
hr Unplanned
Not required for Unplanned
events <I hr
2/22/2013
0837-0841
0
Not required for Unplanned events < 1
hr Unplanned
Not required for Unplanned
events < 1 hr
2/24/2013
1129-1131
0
Not required for Unplanned events < 1
hr Unplanned
Not required for Unplanned
events < 1 hr
Total Flare <=1 Hour 20
Total Flare> 1 Hour
Volume Flared 20
Measured Safety Pilot 171
Continuous Assist 2,360
TOTAL FLARED 2,551
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER N0. 219
PRUDHOE BAY, RAVEN
IURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb -13
DATE
TIME
VOLUME
(Mscf)
DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
2/1/2013
1357-1439
1
Not required for Unplanned
events <1 hr
Unplanned
Not required for Unplanned
events < 1 hr
2/14/2013
1731-1735
2
See Attachments
Planned
See Attachments
2/14/2013
2057-2058
0
See Attachments
Planned
See Attachments
2/18/2013
2226-2235
0
Not required for Unplanned
events < 1 hr
Unplanned
Not required for Unplanned
events < 1 hr
2/19/2013
0848-0849
0
See Attachments
Planned
See Attachments
2/19/2013
1510-1511
0
See Attachments
Planned
See Attachments
2/19/2013
1649-1650
1
See Attachments
Planned
See Attachments
2/19/2013
2125-2127
1
See Attachments
Planned
See Attachments
2/19/2013
2226-2235
0
See Attachments
Planned
See Attachments
2/20/2013
1605-0607
1
Not required for Unplanned
events < 1 hr
Unplanned
Not required for Unplanned
events < 1 hr
2/20/2013
1927-1929
1
Not required for Unplanned
events < 1 hr
Unplanned
Not required for Unplanned
events < 1 hr
2/21/2013
0007-0008
0
Not required for Unplanned
events < 1 hr
Unplanned
Not required for Unplanned
events < 1 hr
2/21/2013
0008-0011
2
Not required for Unplanned
events < 1 hr
Unplanned
Not required for Unplanned
events < 1 hr
2/21/2013
1905-1907
1
Not required for Unplanned
events < 1 hr
Unplanned
Not required for Unplanned
events < 1 hr
2/21/2013
2057-2101
4
Not required for Unplanned
events <1 hr
Unplanned
Not required for Unplanned
events <1 hr
2/22/2013
0837-0841
4
Not required for Unplanned
events <1 hr
Unplanned
Not required for Unplanned
events <1 hr
2/24/2013
1129-1131
1
Not required for Unplanned
events < 1 hr
Unplanned
Not required for Unplanned
events <1 hr
Total Flom <=1 Hour 19
Total Flare > 1 Hour
Volume Flared 19
Measured Safety Pilot 100
Continuous Assist 1,326
TOTAL FLARED 1,445
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb -13
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
2/1/2013
1357-1439
0
Not required for Unplanned
events < 1 hr
Unplanned
Not required for Unplanned events <1
hr
2/14/2013
1731-1735
0
See Attachments
Planned
See Attachments
2/14/2013
2057-2058
0
See Attachments
Planned
See Attachments
2/18/2013
2226-2235
0
Not required for Unplanned
events < 1 hr
Unplanned
Not required for Unplanned events <
1 hr
2/19/2013
0848-0849
0
See Attachments
Planned
See Attachments
2/19/2013
1510-1511
0
See Attachments
Planned
See Attachments
2/19/2013
1649-1650
0
See Attachments
Planned
See Attachments
2/19/2013
2125-2127
0
See Attachments
Planned
See Attachments
2/19/2013
2226-2235
0
See Attachments
Planned
See Attachments
2/20/2013
1605-0607
0
Not required for Unplanned
events <1 hr
Unplanned
Not required for Unplanned events <
1 hr
2/20/2013
1927-1929
0
Not required for Unplanned
events <1 hr
Unplanned
Not required for Unplanned events <
1 hr
2/21/2013
0007-0008
0
Not required for Unplanned
events <1 hr
Unplanned
Not required for Unplanned events <
1 hr
2/21/2013
0008-0011
0
Not required for Unplanned
events <1 hr
Unplanned
Not required for Unplanned events <
1 hr
2/21/2013
1905-1907
0
Not required for Unplanned
events < 1 hr
Unplanned
Not required for Unplanned events <
1 hr
2/21/2013
2057-2101
0
Not required for Unplanned
events <1 hr
Unplanned
Not required for Unplanned events <
1 hr
2/22/2013
0837-0841
0
Not required for Unplanned
events < 1 hr
Unplanned
Not required for Unplanned events <
1 hr
2/24/2013
1129-1131
0
Not required for Unplanned
events <1 hr
Unplanned
Not required for Unplanned events <1
hr
Total Flare <=1 Hour 0
Total Flom ,1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTALFLARED 0
Total Flare <=1 Hour 0
Total Flom .1 Hour
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTALFLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb -13
VOLUME
PLANNED
DATE
TIME
(MSCF)
DESCRIPTION OF INCIDENTS & CAUSE
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
2/1/2013
1357-1439
0
Not required for Unplanned events < 1 hr
Unplanned
Not required for Unplanned events < 1 hr
2/14/2013
1731-1735
0
See Attachments
Planned
See Attachments
2/14/2013
2057-2058
0
See Attachments
Planned
See Attachments
2/18/2013
2226-2235
0
Not required for Unplanned events < 1 hr
Unplanned
Not required for Unplanned events <1 hr
2/19/2013
0848-0849
0
See Attachments
Planned
See Attachments
2/19/2013
1510-1511
0
See Attachments
Planned
See Attachments
2/19/2013
1649-1650
0
See Attachments
Planned
See Attachments
2/19/2013
2125-2127
0
See Attachments
Planned
See Attachments
2/19/2013
2226-2235
0
See Attachments
Planned
See Attachments
2/20/2013
1605-0607
0
Not required for Unplanned events < 1 hr
Unplanned
Not required for Unplanned events < 1 hr
2/20/2013
1927-1929
0
Not required for Unplanned events < 1 hr
Unplanned
Not required for Unplanned events < 1 hr
2/21/2013
0007-0008
0
Not required for Unplanned events < 1 hr
Unplanned
Not required for Unplanned events <1 hr
2/21/2013
0008-0011
0
Not required for Unplanned events < 1 hr
Unplanned
Not required for Unplanned events < 1 hr
2/21/2013
1905-1907
0
Not required for Unplanned events <1 hr
Unplanned
Not required for Unplanned events <1 hr
2/21/2013
2057-2101
0
Not required for Unplanned events <1 hr
Unplanned
Not required for Unplanned events < 1 hr
2/22/2013
0837-0841
0
Not required for Unplanned events < 1 hr
Unplanned
Not required for Unplanned events < 1 hr
2/24/2013
1129-1131
0
Not required for Unplanned events < 1 hr
Unplanned
Not required for Unplanned events < 1 hr
Total Flare <=1 Hour 0
Total Flom .1 Hour
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTALFLARED 0
0
o o
W d d d d
N N N w N
W
m
9
9
A
A
2
w
2
D
iE
n
F
T
T
T
'm
N
W
m
o
o
A
A
w
iE
n
F
T
T
m
3
N
A
zz
o
o
w
iE
F
w
3
w 1
ALASKA OIL AND GAS
COMMISSION
LISBURNE PRODUCTION CENTER #1
SBP EXPLORATION, ALASKA
JPRUDHOf
Disposition
MCF
3. Conserv. Purposes
Volume MCF`
1. Sold
Commissioner Date
97,079
2. Reinjected
10,305,376
3. Flared or vented less than 1 hour.
0
4. Flared or vented greater than 1 hour
(Supplemental report required—See 20 AAC 25.235
0
5. Pilot and Purge
11,547
6. Used for lease operations
Fuel
Assist
849,660
168,886
7. Other
Lift Gas, Off Field
232,108
TOTAL items 1 - 7
11,664,656
8. NGL gas equivalent produced
97,079
9. Purchased gas
0
10. Transferred from: Ml from Prudhoe
Fuel Gas from Prudhoe
1,020,277
1,787
11. Transferred to:
0
Remarks:
I hereby ceti at �h/e�f�or rue and correct to the est f my�knyoJv/�I�edge.
Signature: t�Y ll Title: L� ' 1I(�pate:
/� I
4 13
Form 10-422 (Revised 4/95)
BAY/PT MCINTYRE
contribution of each pool to total.
Pool Name I Code I Percent
640144 1 43.20%
McIntyre 640180 1 49.13%
k -Sap River test in GPMA 640147 1 0.46%
Official Use Only—Flarina Authorization } 1 hr.
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar -13
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events <1 hr
Total Flare <=1 Hour 0
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot 5,019
Continuous Assist 73,510
TOTALFLARED 78,529
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar -13
VOLUME PLANNED
DATE TIME JMSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events <1 hr
Total Flare <=1 Hour 0
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot 5,642
Continuous Assist 82,404
TOTAL FLARED 88,046
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar -13
VOLUME PLANNED
DATE TIME (Ms<f( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events <1 hr
Total Flare <= 1 Hour 0
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot 701
Continuous Assist 10,268
TOTAL FLARED 10,969
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar -13
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Not required for Unplanned events <1 hr Unplanned Not required for Unplanned events <1 hr
Total Flare <=1 Hour 0
Total Flom> I Hour
Volume Flared
Measured Safety Pilot 131
Continuous Assist 1,923
TOTAL FLARED 2,054
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar -13
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events <1 hr
Total Flare <=1 Hour 0
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot 54
Contin nous Assist 781
TOTAL FLARED 83S
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar -13
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr
Total Flare <= I Hour 0
Total Fiore > 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTALFIARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar -13
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Not required for Unplanned events < 1 hr Unplanned Not required for Unplanned events < 1 hr
Total Flom <=1 Hour 0
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facilily Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. MonthNear of Disposition
I Aril -2013
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
101,051
Pool Name Pool Code Percent
7. Reinjected
9,804,988
Lisburne 640144 38.1%
Niakuk 640148 1.1%
8. Flared or vented 1 hour or less
457
North Prudhoe Bay State 640152 0.0%
Sadlerochit 640150 5.8%
9. Flared or vented more than 1 hour (see instr.)
0
Point McIntyre 640180 54.5%
Ivishak-SagRiver test in 640147 0.5%
10. Pilot and Purge
11,170
West Beach 640186 0.0%
11. Assist Gas
190,459
12. Fuel gas used in lease operations.
788,539
13. Other (see instructions)
252,178
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
11,148,842
Lease Use
MCF
15. NGL Gas Equivalent
101,051
Conservation
MCF
16. Purchased gas
U
Waste:
MCF
17. Transferred from:
1,157,769
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,154,798 and Fuel Gas from Prudhoe = 2,971
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
U U i/)z Note: All volumes must be corrected
Signature b/( uG 4 4� L( GZi�/ Title Maria er Production Taxes and Ro Ities Alaska to pressure of 14.65 psis and to a
1 ,3 temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date AAC25.235.
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr -13
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
4/8/2013
0426-0447
40
Not required for Unplanned events <1 hr
4/11/2013
2250-2254
92
Not required for Unplanned events <1 hr
4/12/2013
0224-0228
9
1808 Turbine shutdown for maintenance
4/12/2013
1744-1459
9
1808 Turbine restart after wash fail to start
Total Flare <=1 Hour 150
Total Flare> 1 Hour 0
Volume Flared
150
Measured Safety Pilot
4,258
Continuous Assist
72,473
TOTALFLARED
76,881
Unplanned Not required for Unplanned events < 1 hr
Unplanned Not required for Unplanned events < 1 hr
Planned Depressured
Planned Shutdown and depressured
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr -13
VOLUME PLANNED
_ DATE TIME )MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
4/8/2013
0426-0447
71
4/11/2013
2250-2254
178
4/12/2013
0224-0228
IS
4/12/2013
1744-1459
12
Total Flare c= 1 Hour 276
Total Flom> 1 Hour
0
Volume Flared
276
Measured Safety Pilot
6,089
Continuous Assist
104,146
TOTAL FLARED
110,531
Not required for Unplanned events < 1 hr
Not required for Unplanned events < 1 hr
1808 Turbine shutdown for maintenance
1808 Turbine restart after wash fail to start
Unplanned Not required for Unplanned events <1 hr
Unplanned Not required for Unplanned events c 1 hr
Planned Depressured
Planned Shutdown and depressured
BP EXPLORATION ALASKA, INC,
:ONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr -13
VOLUME PLANNED
DATE TIME (Mmf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
4/8/2013 0426-0447
4/11/2013 2250-2254
4/12/2013 0224-0228
4/12/2013 1744-1459
Total Flom <=1 Hour 6
Total Flom> 1 Hour
0
Volume Flared
6
Measured Safety Pilot
133
Continuous Assist
2,328
TOTAL FLARED
2,467
Not required for Unplanned events < 1 hr
Not required for Unplanned events < 1 hr
1808 Turbine shutdown for maintenance
1808 Turbine restart after wash fail to start
Unplanned
Not required for Unplanned events <1 hr
Unplanned
Not required for Unplanned events <1 hr
Planned
Depressured
Planned
Shutdown and depressured
RP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr -13
VOLUME PLANNED
DATE TIME )Msd) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
4/8/2013 0426-0447
4/11/2013 2250-2254
4/12/2013 0224-0228
4/12/2013 1744-1459
Total Flare <=1 Hour 3
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot 60
Continuous Assist 1,044
TOTAL FLARED 1,107
Not required for Unplanned events <1 hr
Not required for Unplanned events <1 hr
1808 Turbine shutdown for maintenance
1808 Turbine restart after wash fail to start
Unplanned
Not required for Unplanned events <I hr
Unplanned
Not required for Unplanned events <I hr
Planned
Depressured
Planned
Shutdown and depressured
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr -13
VOLUME PLANNED
DATE TIME (Msof( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
4/8/2013
0426-0447 7
4/11/2013
2250-2254 16
4/12/2013
0224-0228 0
4/12/2013
1744-1459 0
Total Flare <=1 Hour 23
Total Flare, 1 Hour 0
Volume Flared 23
Measured Safety Pilot 630
Continuous Assist 10,468
TOTAL FLARED 11,121
Not required for Unplanned events < 1 hr
Not required for Unplanned events < 1 hr
1808 Turbine shutdown for maintenance
1808 Turbine restart after wash fail to start
Unplanned
Not required for Unplanned events <1 hr
Unplanned
Not required for Unplanned events <1 hr
Planned
Depressured
Planned
Shutdown and depressured
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr -13
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
4/8/2013 0426-0447
4/11/2013 2250-2254
4/12/2013 0224-0228
4/12/2013 1744-1459
Total Flom <=1 Hour 0
Total Flom> 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTALFLARED 0
Not required for Unplanned events < 1 hr
Not required for Unplanned events < 1 hr
1808 Turbine shutdown for maintenance
1808 Turbine restart after wash fail to start
Unplanned Not required for Unplanned events < 1 hr
Unplanned Not required for Unplanned events < 1 hr
Planned Depressured
Planned Shutdown and depressured
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr -13
VOLUME PLANNED
DATE TIME (MSCF( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
4/8/2013 0426-0447
4/11/2013 2250-2254
4/12/2013 0224-0228
4/12/2013 1744-1459
Total Flare <=1 Hour 0
Total Flare > 1 Hour
0
Volume Flared
0
Measured Safety Pilot
0
Continuous Assist
0
TOTAL FLARED
0
Not required for Unplanned events < 1 hr
Not required for Unplanned events < 1 hr
1808 Turbine shutdown for maintenance
1808 Turbine restart after wash fail to start
Unplanned Not required for Unplanned events <1 hr
Unplanned Not required for Unplanned events <I hr
Planned Depressured
Planned Shutdown and depressured
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. Month/year of Disposition
Ma -2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
104,201
Pool Name Pool Code Percent
7. Reinjected
9,382,873
Lisburne 640144 43.6%
Niakuk 640148 1.1%
8. Flared orvented 1 houror less
276
North Prudhoe Bay State 640152 0.0%
Sadlerochit 640150 5.2%
9. Flared or vented more than 1 hour (see Iran.)
0
Point McIntyre 640180 49.6%
Ivishak-SagRiver test in 640147 0.5%
10. Pilot and Purge
11,513
West Beach 640186 0.0%
11. Assist Gas
187,128
12. Fuel gas used in lease operations.
818,185
13. Other (see instructions)
203,912
Official Use On fy
Authorization 11 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
10,708,08$
Lease Use
MCF
15. NGL Gas Equivalent
104,201
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
1,219,464
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,218,873 and Fuel Gas from Prudhoe = 591
1 hereby certify that he foregoing/ifs true and correct to the best of my knowledge.
yjn /l�I Note: All volumes must be corrected
Signature II LC 1, Title Mana er Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date�ln AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number2.
0290000009
Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. Month/year of Disposition
June -2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume,
6. Sold
75,796
Pool Name Pool Code Percent
7. Reinjected
8,552,528
Lisburne 640144 41.6%
Niakuk 640148 1.4%
8. Flared or vented 1 hour or less
315
North Prudhoe Bay State 640152 0.0%
Sadlerochit 640150 5.5%
9. Flared or vented more than 1 hour (see instr.)
0
Point McIntyre 640180 51.0%
Ivishak-SagRiver test in 640147 0.5%
10. Pilot and Purge
11,120
West Beach 640186 0.0%
11. Assist Gas
156,987
12. Fuel gas used in lease operations.
737,947
13. Other (see instructions)
209,908
Official Use Only
authorization>1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
9,744,601
Lease Use
MCF
15. NGL Gas Equivalent
75,796
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
1,050,187
18. Transferred to: (Express as a negative #)
0
Commissioner Date
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,050,187 and Fuel Gas from Prudhoe = 0
1 hereby certify that the foregoing is true d correct to the best of my knowledge.
AA// -- Note: All volumes must be corrected
Signature �/ la= �� �rA+n+1; E.O� Tide Mana er Production Taxes and Ro alties Alaska to pressure of 14.65 psia and t0 a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date ri ZO! AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. MonthNear of Disposition
I July -2013
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
81,544
Pool Name Pool Code Percent
7. Reinjected
8,718,369
Lisburne 640144 42.5%
Niakuk 640148 1.4%
8. Flared or vented 1 hour or less
0
North Prudhoe Bay State 640152 0.0%
Sadlerochit 640150 5.5%
9. Flared or vented more than 1 hour (see instr.)
0
Point McIntyre 640180 50.1%
Ivishak-SagRiver test in 640147 0.6%
10. Pilot and Purge
11,417
West Beach 640186 0.0%
11. Assist Gas
148,556
12. Fuel gas used in lease operations.
773,841
13. Other (see instructions)
191,237
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
9,924,964
Lease Use
MCF
15. NGL Gas Equivalent
81,544
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from:
987,426
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 987,426 and Fuel Gas from Prudhoe = 0
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
y u1nA Note: All volumes must corrected
Signaturena/� tk Title Mana er Production Taxes and Royalties Alaska f0 pressure Of 14.65 psisis and t0 a
/ temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date / AAC25.235.
Form 10-022 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
PBU LA=NE PROD GPMA
3, Field
PBU - GPMA
4. Operator
BP
5. Month/year of Disposition
August -2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
74,926
Pool Name PoolCode Percent
7. Reinjected
8,104,719
(Lisburne 640144 43.7%
Niakuk 640148 1.0%
8. Flared or vented 1 hour or less
1,016
North Prudhoe Bay State 640152 0.0%
Sadlerochit 640150 5.4%
9. Flared or vented more than 1 hour (see instr.)
2,768
Point McIntyre 640180 49.1%
Ivishak-SagRiver test in 640147 0.8%
10. Pilot and Purge
11,499
West Beach 640186 0.0%
11. Assist Gas
156,667
12. Fuel gas used in lease operations.
688,336
13. Other (see instructions)
159,675
Official Use Only
Authorization >1 he
Safety
D
Z �(o D
MCF
14. TOTAL VOLUME (ITEMS 6-12)
9,199,606
Lease Use
MCF
15, NGL Gas Equivalent
74,926
Conservation
MCF
16. Purchased gas
p
Waste:
MCF
17. Transferred from:
1,132,344
_ /f
Commissioner Date
18. Transferred to: (Express as a negative #)
p
19. Remarks: Block 13: Lift Gas Off Field; block 17: MI from Prudhoe = 1,124,984 and Fuel Gas from Prudhoe = 7,360
I hereby certify that th foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature 1. f Title Mana er Production Taxes and R aloes Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date / AAC25.235.
V,1-1--
& /,7 J) 4 -
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
DATE
TIME
VOLUME
(MSCF)
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug -13
DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
8/8/2013
0322-0327
157
Not required for Unplanned events <1 hr
Planned
Not required for Unplanned events <I hr
8/8/2013
1902-1905
97
Not required for Unplanned events < 1 hr
Planned
Not required for Unplanned events < 1 hr
8/8/2013
1928-1930
I
Not required for Unplanned events < 1 hr
Planned
Not required for Unplanned events < 1 hr
8/11/2013
0002-0002
2
Not required for Unplanned events < 1 hr
Planned
Not required for Unplanned events < 1 hr
8/12/2013
2008-2009
7
Not required for Unplanned events < 1 hr
Planned
Not required for Unplanned events < 1 hr
8/13/2013
0124-0128
93
Not required for Unplanned events < 1 hr
Planned
Not required for Unplanned events < 1 hr
8/19/2013
0105-0130
86
Not required for Unplanned events <1 hr
Unplanned
Not required for Unplanned events < 1 hr
Total Flare <a 1 Hour
443
1,294
GPMA Planned Shutdown- Vented East Side Pipelines for
8/8/2013
1954-2150
Drillsite Maintenance Work.
Planned
Depressured.
41
GPMA August Shutdown - Plant start-up, started 1808
Increased Row rates into the facility and
8/10/2013
2148-2359
Reinjection Compressor.
Planned
began loading compressor.
Total Flare> 1 Hour
1,335
Volume Flared
1,778
Measured Safety Pilot
4,651
Continuous Assist
67,821
TOTAL FLARED
74,250
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug -13
Total Flom <=1 Hour 408
507
08/08/13 1954-2150 GPMA Planned Shutdown- Vented East Side Pipelines for Drill Planned
369
08/10/13 2148-2359 GPMA August Shutdown - Plantstart-up, started 1808 Reinjec Planned
Total Flom> I Hour
876
VOLUME
1,284
Measured Safety Pilot
PLANNED
Continuous Assist
DATE
TIME
(MSCF)
DESCRIPTION OF INCIDENTS & CAUSE
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
8/8/2013
0322-0327
63
Not required for Unplanned events <
1 hr
Planned
Not required for Unplanned events < 1 hr
8/8/2013
1902-1905
37
Not required for Unplanned events <1
hr
Planned
Not required for Unplanned events <I hr
8/8/2013
1928-1930
1
Not required for Unplanned events <
1 hr
Planned
Not required for Unplanned events <1 hr
8/11/2013
0002-0002
20
Not required for Unplanned events <
1 hr
Planned
Not required for Unplanned events <1 hr
8/12/2013
2008-2009
57
Not required for Unplanned events <
1 hr
Planned
Not required for Unplanned events <1 hr
8/13/2013
0124-0128
141
Not required for Unplanned events <
1 hr
Planned
Not required for Unplanned events < 1 hr
8/19/2013
0105-0130
89
Not required for Unplanned events <
1 hr
Unplanned
Not required for Unplanned events < 1 hr
Total Flom <=1 Hour 408
507
08/08/13 1954-2150 GPMA Planned Shutdown- Vented East Side Pipelines for Drill Planned
369
08/10/13 2148-2359 GPMA August Shutdown - Plantstart-up, started 1808 Reinjec Planned
Total Flom> I Hour
876
Volume Flared
1,284
Measured Safety Pilot
5,777
Continuous Assist
76,305
TOTALFLARED
83,366
Depressured.
Increased flow rates into the facility and begat
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO, 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug -13
Total Flom <=1 Hour 4
22
08/08/13 1954-2150 GPMA Planned Shutdown - Vented East Side Pipelines for Drill Planned
0
08/10/13 2148-2359 GPMA August Shutdown - Plant start-up, started 1808 Reinter Planned
Total Flare > 1 Hour 22
Volume Flared 26
Measured Safety Pilot 104
Continuous Assist 1,532
TOTAL FLARED 1,662
Depressured.
Increased flow rates into the facility and bega
VOLUME
PLANNED
DATE
TIME
(Mscf)
DESCRIPTION OF INCIDENTS & CAUSE
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
8/8/2013
0322-0327
1
Not required for Unplanned events <1 hr
Planned
Not required for Unplanned events < 1 hr
8/8/2013
1902-1905
1
Not required for Unplanned events <1 hr
Planned
Not required for Unplanned events <1 hr
8/8/2013
1928-1930
0
Not required for Unplanned events <1 hr
Planned
Not required for Unplanned events< 1 hr
8/11/2013
0002-0002
0
Not required for Unplanned events <1 hr
Planned
Not required for Unplanned events < 1 hr
8/12/2013
2008-2009
0
Not required for Unplanned events <1 hr
Planned
Not required for Unplanned events < 1 hr
8/13/2013
0124-0128
1
Not required for Unplanned events <1 hr
Planned
Not required for Unplanned events < 1 hr
8/19/2013
0105-0130
1
Not required for Unplanned events <1 hr
Unplanned
Not required for Unplanned events <1 hr
Total Flom <=1 Hour 4
22
08/08/13 1954-2150 GPMA Planned Shutdown - Vented East Side Pipelines for Drill Planned
0
08/10/13 2148-2359 GPMA August Shutdown - Plant start-up, started 1808 Reinter Planned
Total Flare > 1 Hour 22
Volume Flared 26
Measured Safety Pilot 104
Continuous Assist 1,532
TOTAL FLARED 1,662
Depressured.
Increased flow rates into the facility and bega
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug -13
Total Flare <=1 Hour 4
3
08/08/13 1954-2150 GPMA Planned Shutdown- Vented East Side Pipelines for Drill Planned
0
08/10/13 2148-2359 GPMA August Shutdown - Plant start-up, started 1808 Reinjec Planned
Total Flare> 1 Hour 3
Volume Flared 7
Measured Safety Pilot 84
Continuous Assist 1,215
TOTAL FLARED 1,306
Depressured.
Increased flow rates into the facility and bega
VOLUME
PLANNED
DATE
TIME
jMnq
DESCRIPTION OF INCIDENTS & CAUSE
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
8/8/2013
0322-0327
0
Not required for Unplanned events < i hr
Planned
Not required for Unplanned events < 1 hr
8/8/2013
1902-1905
0
Not required for Unplanned events < 1 hr
Planned
Not required for Unplanned events < 1 hr
8/8/2013
1928-1930
0
Not required for Unplanned events < 1 hr
Planned
Not required for Unplanned events < 1 hr
8/11/2013
0002-0002
0
Not required for Unplanned events < 1 hr
Planned
Not required for Unplanned events < 1 hr
8/12/2013
2008-2009
0
Not required for Unplanned events < 1 hr
Planned
Not required for Unplanned events < 1 hr
8/13/2013
0124-0128
2
Not required for Unplanned events <I hr
Planned
Not required for Unplanned events <I hr
8/19/2013
0105-0130
2
Not required for Unplanned events < 1 hr
Unplanned
Not required for Unplanned events < 1 hr
Total Flare <=1 Hour 4
3
08/08/13 1954-2150 GPMA Planned Shutdown- Vented East Side Pipelines for Drill Planned
0
08/10/13 2148-2359 GPMA August Shutdown - Plant start-up, started 1808 Reinjec Planned
Total Flare> 1 Hour 3
Volume Flared 7
Measured Safety Pilot 84
Continuous Assist 1,215
TOTAL FLARED 1,306
Depressured.
Increased flow rates into the facility and bega
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug -13
Total Flare <= i Hour 157
373
08/08/13 1954-2150
159
08/10/13 2148-2359
Total Flare> I Hour 532
Volume Flared 689
Measured Safety Pilot 883
Continuous Assist 9,794
TOTALFLARED 11,366
GPMA Planned Shutdown - Vented East Side Pipelines for Drillsi Planned
GPMA August Shutdown - Plant start-up, started 1808 Reinjecth Planned
Depressured.
Increased flow rates into the facility and began loading co
VOLUME
PLANNED
DATE
TIME
(Mscf)
DESCRIPTION OF INCIDENTS & CAUSE
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
8/8/2013
0322-0327
45
Not required for Unplanned events< 1 hr
Planned
Not required for Unplanned events <1 hr
8/8/2013
1902-1905
29
Not required for Unplanned events< 1 hr
Planned
Not required for Unplanned events <I hr
8/8/2013
1928-1930
0
Not required for Unplanned events <I hr
Planned
Not required for Unplanned events <1 hr
8/11/2013
0002-0002
9
Not required for Unplanned events < 1 hr
Planned
Not required for Unplanned events < 1 hr
8/12/2013
2008-2009
20
Not required for Unplanned events < 1 hr
Planned
Not required for Unplanned events <1 hr
8/13/2013
0124-0128
45
Not required for Unplanned events <1 hr
Planned
Not required for Unplanned events <I hr
8/19/2013
0105-0130
9
Not required for Unplanned events < 1 hr
Unplanned
Not required for Unplanned events <1 hr
Total Flare <= i Hour 157
373
08/08/13 1954-2150
159
08/10/13 2148-2359
Total Flare> I Hour 532
Volume Flared 689
Measured Safety Pilot 883
Continuous Assist 9,794
TOTALFLARED 11,366
GPMA Planned Shutdown - Vented East Side Pipelines for Drillsi Planned
GPMA August Shutdown - Plant start-up, started 1808 Reinjecth Planned
Depressured.
Increased flow rates into the facility and began loading co
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug -13
Total Flare r-1 Hour 0
0
08/08/13 1954-2150
0
08/10/13 2148-2359
Total Flare > 1 Hour
0
VOLUME
0
PLANNED
0
DATE
TIME
(MSCF)
DESCRIPTION OF INCIDENTS& CAUSE
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
8/8/2013
0322-0327
0
Not required for Unplanned events < 1 hr
Planned
Not required for Unplanned events <1 hr
8/8/2013
1902-1905
0
Not required for Unplanned events < 1 hr
Planned
Not required for Unplanned events <1 hr
8/8/2013
1928-1930
0
Not required for Unplanned events < 1 hr
Planned
Not required for Unplanned events <1 hr
8/11/2013
0002-0002
0
Not required for Unplanned events < 1 hr
Planned
Not required for Unplanned events <1 hr
8/12/2013
2008-2009
0
Not required for Unplanned events < 1 hr
Planned
Not required for Unplanned events <1 hr
8/13/2013
0124-0128
0
Not required for Unplanned events < 1 hr
Planned
Not required for Unplanned events <1 hr
8/19/2013
0105-0130
0
Not required for Unplanned events < 1 hr
Unplanned
Not required for Unplanned events <1 hr
Total Flare r-1 Hour 0
0
08/08/13 1954-2150
0
08/10/13 2148-2359
Total Flare > 1 Hour
0
Volume Flared
0
Measured Safety Pilot
0
Continuous Assist
0
TOTAL FLARED
0
GPMA Planned Shutdown- Vented East Side Pipelines for Drill Planned Depressured.
GPMA August Shutdown - Plant start-up, started 1808 Reinjec Planned Increased flow rates into the facility and bega
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug -13
Total Flare <=1 Hour 0
0
VOLUME
PLANNED
0
DATE
TIME
(MSCF(
DESCRIPTION OF INCIDENTS & CAUSE
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
Measured Safety Pilot
0
Continuous Assist
0
TOTALFLARED
0
8/8/2013
0322-0327
0
Not required for Unplanned events < 1 hr
Planned
Not required for Unplanned events < 1 hr
8/8/2013
1902-1905
0
Not required for Unplanned events <1 hr
Planned
Not required for Unplanned events < 1 hr
8/8/2013
1928-1930
0
Not required for Unplanned events <1 hr
Planned
Not required for Unplanned events < 1 hr
8/11/2013
0002-0002
0
Not required for Unplanned events <1 hr
Planned
Not required for Unplanned events <1 hr
8/12/2013
2008-2009
0
Not required for Unplanned events <1 hr
Planned
Not required for Unplanned events <1 hr
8/13/2013
0124-0128
0
Not required for Unplanned events <1 hr
Planned
Not required for Unplanned events <1 hr
8/19/2013
0105-0130
0
Not required for Unplanned events <1 hr
Unplanned
Not required for Unplanned events <1 hr
Total Flare <=1 Hour 0
GPMA Planned Shutdown -Vented East Side Pipelines for Drill Planned Depressured.
GPMA August Shutdown - Plant start-up, started 1808 Reinjec Planned Increased flow rates into the facility and begat
0
08/08/13 1954-2150
0
08/10/13 2148-2359
Total Flare> 1 Hour
0
Volume Flared
0
Measured Safety Pilot
0
Continuous Assist
0
TOTALFLARED
0
GPMA Planned Shutdown -Vented East Side Pipelines for Drill Planned Depressured.
GPMA August Shutdown - Plant start-up, started 1808 Reinjec Planned Increased flow rates into the facility and begat
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
P13 LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. Month/Vear of Disposition
mber-2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
67,286
Pool Name Pool Code Percent
7. Reinjected
9,954,535
Lisburne 640144 39.9%
Niakuk 640148 1.1%
8. Flared or vented 1 hour or less
524
North Prudhoe Bay State 640152 0.0%
Sadlerochit 640150 4.1%
9. Flared or vented more than 1 hour (see instr.)
0
Point McIntyre 640180 54.2%
lvishak-Saq River test in 640147 0.8%
10. Pilotand Purge
11,125
West Beach 640186 0.0%
11. Assist Gas
189,786
12. Fuel gas used in lease operations.
771,095
13. Other (see instructions)
251,846
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
11,266,197
Lease Use
MCF
15. NGL Gas Equivalent
87,286
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
1,837,048
Commissioner Date
18. Transferred to: (Express as a negative #)
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,837,048 and Fuel Gas from Prudhoe = 0
1 hereby certify thattheforegoing is true �annd1 correct to the best of my knowledge.
Note: All volumes must be corrected
Signature ("le_ L.h1�X Title Mana er Production Taxes and Ro allies Alaska to pressure of 14.65 psis and to a
Printed Name Diane Colleytemperature of 60o F. Authority 20
Phone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. MonthNear of Disposition
I October -2013
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
103,017
Pool Name Pool Code Percent
7. Reinjected
10,703,593
Lisburne 640144 36.3%
Niakuk 640148 0.8%
8. Flared or vented 1 hour or less
0
North Prudhoe Bay State 640152 0.0%
Sadlerochit 640150 4.0%
9. Flared or vented more than 1 hour (see insh.)
0
Point McIntyre 640180 58.3%
Ivishak-SagRiver test in 640147 0.6%
10. Pilot and Purge
11,487
West Beach 640186 0.0%
11. Assist Gas
186,466
12. Fuel gas used in lease operations.
816,498
13. Other (see instructions)
393,600
Official Use Only
Authorization>1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
12,214,661
Lease Use
MCF
15. NGL Gas Equivalent
103,017
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
1,821,214
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,813,758 and Fuel Gas from Prudhoe = 7,456
1 hereby certify that t foregoing is true and correct to the best of my knowledge.
Y le/Dbin Note: All volumes must be corrected
Signature Title Mana er Production Taxes an Ro alties Alaska t0 pressure of 14.65 psia and to a
/ /J temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date ± AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. Month/Year of Disposition
November -2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
104,434
Pool Name Pool Code Percent
7. Reinjected
10,004,653
Lisburne 640144 29.0%
Niakuk 640148 0.5%
8. Flared or vented 1 hour or less
0
North Prudhoe Bay State 640152 0.0%
Sadlerochit 640150 11.0%
9. Flared or vented more than 1 hour (sea instr.)
0
Point McIntyre 640180 59.1%
Ivishak-SagRiver test in 640147 0.4%
10. Pilot and Purge
11,171
Vilest Beach 640186 0.0%
11. Assist Gas
146,954
12. Fuel gas used in lease operations.
823,940
13. Other (see instructions)
278,082
Official Use Only
Authorization >7 he
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
11,369,234
Lease Use
MCF
15. NGL Gas Equivalent
104,434
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
1,060,683
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 13: Lift Gas Off Field; Block 17: Ml from Prudhoe = 1,060,616 and Fuel Gas from Prudhoe = 67
Eherebe at a foregoing is true and comectto the best of my knowledge.Note:
Title Mana er Production Taxes and Ro alties Alaska
All volumes must be corrected
tO pressure Of 14.65 Asia and to a
temperature of 60o F. Authority 20
AAC25.235.
Diane Colley Phone (907) 564-5775 Date
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. Monthfyear of Disposition
December -2013
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
103,569
Pool Name Pool Code Percent
7. Reinjected
10,277,589
Lisburne 640144 27.7%
Niakuk 640148 0.8%
8. Flared or vented 1 hour or less
471
North Prudhoe Bay State 640152 0.0%
Sadlerochit 640150 10.7%
9. Flared or vented more than 1 hour (see instr.)
0
Point McIntyre 640180 60.2%
lvishak-Saa River test in 640147 0.7%
10. Pilot and Purge
11,565
West Beach 640186 0.0%
11. Assist Gas
166,788
12. Fuel gas used in lease operations.
832,552
13. Other (see instructions)
353,480
Official Use OnlyMCF
Authorization >1 hr:
Safety
14. TOTAL VOLUME (ITEMS 6.12)
11,746,014
Lease Use
MCF
15. NGL Gas Equivalent
103,569
Conservation
MCF
16. Purchased gas
U
Waste:
MCF
17. Transferred from:
1,422,950
Commissioner Date
18. Transferred to: (Express as a negative ff)
0
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,415,222 and Fuel Gas from Prudhoe = 7,728
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
�/U Note: All volumes must be corrected
Signature fGL iN' Title Mana er Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date L/ AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate