Gas Disposition Files
Year: 2014
Facility: DIU Endicott
Operator: BP EXPLORATION (ALASKA)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000002
2. Facility Name
DIU Endicott
3. Field
Endicott
4. Operator
I BP
5. MonthfYear of Disposition
I Jan -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
55,028
Pool Name Pool Code Percent
7. Reinjected
10,306,865
Endicott 220100 96.31%
Sag Delta 220150 0.05%
8. Flared or vented 1 hour or less
19
Eider 220165 3.53%
Minke Tract Op 220170 0.11%
9. Flared or vented more than 1 hour (see instr.)
Q
100.00%
10. Pilot and Purge
10,199
11. Assist Gas
21,476
12. Fuel gas used in lease operations.
1,048,050
13. Other (see instructions)
Use Onlyons)
Authorization >i hr:
Safety
MCF
14. TOTAL VOLUME(ITEMS 6-13)
11,441,637
Lease Use
MCF
15. NGL Gas Equivalent
54,050
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from:
Commissioner Date
18. Transferred to: (Express as a negative #)
19. Remarks: Block 6 includes gas sold to Badami, gas sold to Liberty and the NGL gas equivalent sold. Gas sold to the Endicott Pipeline Company is included in Block 12.
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
�/� Manager, Production Taxes and Royalties Note: All volumes must be
Signature CLSt Title Alaska corrected to pressure of 14.65 psia
f and to a temperature of 60o F.
Printed Name Diane Colla Phone (907)564-5775 Date / I Authority 20 AAC25.235.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000002
2. Facility Name
DIU Endicott
3. Field
Endicott
4. Operatof
BP
5. Month/Year of Disposition
Feb -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
46,532
Pool Name Pool Code Percent
7. Reinjected
9,191,725
Endicott 220100 97.23%
Sag Delta 220150 0.07%
e. Flared or vented 1 hour or less
157
Elder 220165 2.59%
Minks Tract Op 220170 0.11%
9. Flared or vented more than 1 hour (see insir.)
0
100.00%
10. Pilot and Purge
9,212
11. Assist Gas
19,150
12. Fuel gas used in lease operations.
948,011
13. Other (see instructions)
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.13)
10,214,787
Lease Use
MCF
15. NGL Gas Equivalent
46,141
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from:
Commissioner Date
16. Transferred to: (Express as a negative #)
19. Remarks: Block 6 includes gas sold to Badami, gas sold to Liberty and the NGL gas equivalent sold. Gas sold to the Endicott Pipeline Company is included in Block 12.
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Manager, Production Taxes and Royalties Note: All volumes must be
vw�Signature_ Title Alaska corrected to pressure of 14.65 psia
and to a temperature of 60o F.
Printed Name Diane Cole Phone (907)564-5775 DataAuthoritv 20 AAC 5.23 .
iJ1A1J
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000002
2. Facility Name
DIU Endicott
3. Field
Endicott
4. Operator
I BP
5. MonthNear of Disposition
I Mar -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
e. Sold
50,009
Pool Name Pool Code Percent
7. Reinjected
9,890,821
Endicott 220100 97.06%
Sag Delta 220150 0.08%
8. Flared or vented 1 hour or less
15
Elder 220165 2.75%
Minke Tract Go 220170 0.11%
9. Flared or vented more than 1 hour (see instr.)
0
100.00%
10. Pilot and Purge
10,199
11. Assist Gas
21,220
12. Fuel gas used in lease operations.
1,045,108
13. Other (see instructions)
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-13)
11,017,372
Lease Use
MCF
15. NGL Gas Equivalent
48,779
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from:
Commissioner Date
18. Transferred to: (Express as a negative #)
19, Remarks: Block 6 includes gas sold to Badami, gas sold to Liberty and the NGL gas equivalent sold. Gas sold to the Endicott Pipeline Company is included in Block 12.
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Manager, Production Taxes and Royalties F Note -.,.fl volumes must be
Signature �CVr11 Tide Alaska corrected to pressure of 14.65 psis
V and to a temperature of 60o F.
Printed Name Diane Colley Phone 907)564-5775 Date / C2 ,219
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000002
2. Facility Name
DIU Endicott
3. Field
Endicott
4. Operator
I BP
5. MonthNear of Disposition
I Apr -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
s. Sold
29,665
Pool Name Pool Code Percent
7. Reinjected
6,589,055
Endicott 220100 97.31%
Sag Delta 220150 0.05%
B. Flared or vented 1 hour or less
1,274
Eider 220165 2.56%
Minke Tract Op 220170 0.08%
9. Flared or vented more than 1 hour (see instr.)
2,960
100.00%
10. Pilot and Purge
9,870
11. Assist Gas
21,464
12. Fuel gas used in lease operations.
850,411
13. Other (see instructions)
Official Use Only
Authorization hr:
Safety
Z / �O r�
MCF
14. TOTAL VOLUME (ITEMS 6.13)
7,504,699
Lease Use
MCF
15. NGL Gas Equivalent
28,226
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from:
/
21 (4(
Co issioner Date
16. Transferred to: (Express as a negative #)
19. Remarks: Block 6 includes gas sold to Badami, gas sold to Liberty and the NGL gas equivalent sold. Gas sold to the Endicott Pipeline Company is included in Block 12.
1 hereby certify that t//thh���e foregoing is true and correct to the best of my knowledge.
�� �/�/(/�„� Manager, Production Taxes and Royalties
signature �/ Title Alaska
Printed Name Diane Colle Phone (907)564-5775 Date y /
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 60o F.
Authoritv 20 AAC25.235.
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
Apr -2014
UAL= I TwjG cfL'a mr inar, Ur %NIUMR t-* IAVpc,
TOTAL 970 Not required for unplanned events which Not required for unplanned events which
are less than or equal to I hour are less than or equal to 1 hour
1Unplanned Events greater than 1 hour
183
DATE
TIME
VOLUME
.......... .... .. ...... ... . .. C
4/19/2014
2055-2203
84
Ist stage separator high pressure trip
MPI & SDI wells shut in
4/2012014
0000-0315
89
Booster compressor down
Start Booster compressor
4/2012014
1343-1508
64
Booster compressor down
Start Booster compressor
4/25/2014
1324-1457
46
Booster compressor down
Start Booster compressor
4/25-2612014
1623-0720
846
B main compressor tripped
Start B main compressor
4127/2014
1347-1859
149
Booster compressor down
Start Booster compressor
4/282014
1454-1729
79
Propane turbine given a start
Propane turbine on line
............... -
, o �,X
TOTAL
1,357 V-
ON
SUMM
IPlanned Events less than or equal to 1 hour
DATE TIME VOLUME �': ' UIMIN
... . ......
TOTAL 304 Not required for planned events which Not required for planned events which
are less than or equal to I hour are less than or equal to 1 hour
4/16-1712014 2255-0226
183
Shutting down A main for water washes
Shut in wells to make up for loss of A main
4/2012014 0340-1328
321
Starting A main gas compressor
Started A main and closed copus starting gas
4/2112014 0604-2130
1,045
B main shut down and depressured
Depressure and close vent valves
412112014 2131-2329
54Booster
1,603
compressor down
Start booster compressorTOTAL
V/
A IPA
............... -
, o �,X
M NKE
........ ............. .....
ON
SUMM
Volume flared less than 1 hr
1,274
33
1
0
1,240
Volume flared greater than
2,960 ✓
76
2
2
2,880
1 hr
Pilot Purge
9,870
253
8
5
9,604
Assist Gas
21,464
550
17
11
20,886
TOTAL FLARED VOLUME
35,568
9112
28
is
34,610
517/2014 1 of 1
Hunt, Jennifer L (DOA)
From: AK, HSSEE Env Adv North [AKHSSEEEnvAdvNorth@bp.com]
Sent: Monday, April 28, 2014 3:17 PM
To: Roby, David S (DOA); Ferguson, Victoria L (DOA); Hunt, Jennifer L (DOA)
Cc: AK, OPS END Facility & FieldO&M TL; AK, OPS END Operations Lead Tech; AK, HSSEE
Env TL (North Slope); Fiedler, Anne M; Cooke, Alison D
Subject: Endicott Flaring Summary April 19-27, 2014
To: Dave Roby, AOGCC
Victoria Ferguson, AOGCC
Jennifer Hunt, AOGCC
BPXA is providing courtesy notification of several planned and unplanned flaring events of greater than one hour which
occurred at the Endicott Production Facility. These events were the result of necessary maintenance on the "A" Main
compressor, "B" Main compressor, and booster compressor.
Summary of planned flaring events:
20 -Apr -14 3:40 (588 minutes, 321 MCF)
21 -Apr -14 6:04 (926 minutes, 1,045 MCF)
21 -Apr -14 21:31 (118 minutes, 54 MCF)
Summary of unplanned flaring events:
19 -Apr -14 20:55 (68 minutes, 84 MCF)
20 -Apr -14 0:00 (195 minutes, 89 MCF)
20 -Apr -14 13:43 (85 minutes, 64 MCF)
25 -Apr -14 13:24 (93 minutes, 46 MCF)
25 -Apr -14 16:23 (457 minutes, 457 MCF)
26 -Apr -14 0:00 (440 minutes. 389 MCF)
27 -Apr -14 13:47 (312 minutes, 149 MCF)
All attempts were made to identify problems, expedite maintenance, and keep flaring & assist gas to a minimum. Given
these circumstances, we believe that we took all necessary actions in accordance with good oil field engineering practices
and conservation purposes to minimize the volume of gas released, burned, or permitted to escape to the air. These
volumes will also be reported to you on the Facility Report of Produced Gas Disposition Form (Form 10-422).
Thank you,
Ken Miller
AK, HSSEE Environmental Advisor North
W (907)659-6810
Pager 659-5272, #4313
Harmony (907)659-6441
Alternate: Rich Vicente
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number T.
0290000002
Facility Name
DIU Endicott
3. Field
Endicott
4. Operator
I BP
5. Month/Year of Disposition
I May -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
41,241
Pool Name Pool Code Percent
7. Reinjected
9,018,583
Endicott 220100 99.31%
Sag Delta 220150 0.06%
e. Flared or vented 1 hour or less
52
Eider 220165 0.50%
Minke Tract Op 220170 0.12%
9. Flared or vented more than 1 hour (see instr.)
374
100.00%
10. Pilot and Purge
10,199
11. Assist Gas
22,033
12. Fuel gas used in lease operations.
999,000
13. Other (see instructions)
Official Use Only
Authorization >1 hr:
Safety
3 �
MCF
14. TOTAL VOLUME (ITEMS 6-13)
10,091,482
Lease Use
MCF
15. NGL Gas Equivalent
40,993
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from:
n
/
Comm sinner Date
16. Transferred to: (Express as a negative #)
19. Remarks: Block 6 includes gas sold to Badami, gas sold to Liberty and the NGL gas equivalent sold. Gas sold to the Endicott Pipeline Company is included in Block 12.
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
n, v Manager, Production Taxes and Royalties Note: All volumes must be
Signature (7/ Title Alaska corrected to pressure of 14.65 psia
J and to a temperature of 60o F.
Printed Name Diane ColleyPhone (907)564-5775 Date ( tv 20 AAC25.235.
✓�h
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
May -2014
Unplanned Events less than or equal to 1 hour
PATE TIME
t10$ IPTtOt �iF:.I.N0i4i $`GWSA
4GTiQt4iAKENTE7$11NII.MRiE}<At3BE;;
TOTAL
52
Not required for unplanned events which
Not required for unplanned events which
are less than or equal to 1 hour
are less than or equal to 1 hour
Unplanned Events greater than 1 hour
DATE TIME
VOLUME
DESCRIPTtONUF.it�CkDENT&;CAUSE
ACTI.ONTAKENTOELIMC( YEC11Lk&E
5/1912014 1205-1523
374
Booster compressor shut down
Restart booster compressor
TOTAL
374
Planned Events less than or equal to 1 hour
DATE TIME-
UN.4LUMEDE
CRIPTK3N OF;INCkDENT &;(SAt33E
ACTION TAKENTO EL{MINATE
TOTAL
0
Not required for planned events which
Not required for planned events which
are less than or equal to 1 hour
are less than or equal to 1 hour
Planned Events greater than 1 hour
DATE TIME
V07UME:.
DESD'.:.I. W .: 'mmusE.
A :-: , ,. :: LI :,: CAUSE
TOTAL
0
fiOTAL
EIDR
NIhIK�QOTT
Volume flared less than 1 hr
52
0
0
0
52
Volume flared greater than
374
2
0
0
372
1 hr
Pilot Purge
10,199
51
12
6
10,130
Assist Gas
22.033
111
27
13
21.882
TOTAL FLARED VOLUME
32,658
164
39
19
32,436
6/4/2014
1oft
Hunt, Jennifer L (DOA)
From: AK, HSSEE Env Adv North [AKHSSEEEnvAdvNorth@bp.com]
Sent: Wednesday, May 21, 2014 12:48 PM
To: Roby, David S (DOA); Ferguson, Victoria L (DOA); Hunt, Jennifer L (DOA)
Cc: AK, OPS END Facility & FieldO&M TL; AK, OPS END Operations Lead Tech, AK, HSSEE
Env TL (North Slope); Fiedler, Anne M; Cooke, Alison D
Subject: Endicott Flaring notification May 19, 2014
To: Dave Roby, AOGCC
Victoria Ferguson, AOGCC
Jennifer Hunt, AOGCC
BPXA is providing courtesy notification of one unplanned flaring event of greater than one hour which occurred at the
Endicott Production Facility. This event was the result of a shutdown of the booster compressor due to a mechanical
failure.
Summary of unplanned flaring event:
19 -May -14 12:05 (196 minutes, 374 MCF)
All attempts were made to identify problems, expedite maintenance, and keep flaring & assist gas to a minimum. Given
these circumstances, we believe that we took all necessary actions in accordance with good oil field engineering practices
and conservation purposes to minimize the volume of gas released, burned, or permitted to escape to the air. These
volumes will also be reported to you on the Facility Report of Produced Gas Disposition Form (Form 10-422).
Thank you,
Ken Miller
AK, HSSEE Environmental Advisor North
W (907)659-6810
Pager 659-5272, #4313
Harmony(907)659-6441
Alternate: Rich Vicente
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000002
2. Facility Name
DIU Endicott
3. Field
Endicott
4. Operator
I BP
5. MonthNear of Disposition
I Jun -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
31,143
Pool Name Pool Code Percent
7, Reinjected
8,934,331
Endicott 220100 99.64%
Sag Delta 220150 0.04%
8. Flared or vented 1 hour or less
180
Eider 220165 0.20%
Minke Tract Op 220170 0.13%
9. Flared or vented more than 1 hour (see instr.)
1,686
100.00%
10. Pilot and Purge
9,870
11. Assist Gas
21,519
12. Fuel gas used in lease operations.
963,031
13. Other (see instructions)
Official Use Only
Authodzatlon>i hr.
Safe ty
rP �/
MCF
14. TOTAL VOLUME (ITEMS 6-13)
9,961,760
LeE
MCF
15. NGL Gas Equivalent
30,865
Co
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from:
^
I. 4 ii_3 _/ l /
Com i sinner _J r� Date 4/ -
18. Transferred to: (Express as a negative #)
19. Remarks: Block 6 includes gas sold to Bachand, gas sold to Liberty and the NGL gas equivalent sold. Gas sold to the Endicott Pipeline Company is included in Block 12.
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Mn Volnager, Production Taxes and Royalties
Signature /J/ Ny Title Alaska
t v 000 I/.� Iq
Printed Name Diane ColleyPhone (907)564-5775 Date L' i l
Note: All volumes must be
corrected to pressure of 14.65 psia
and to a temperature of 60o F.
Authority 20 AAQ91; 219
YL- r
g/zs h q
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
Jun -2014
jUnplanned Events less than or equal to I hour
DATE TIME 1,09P,"M N
TOTAL 166 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
[Unplanned Events greater than I hour
TOTAL
EIDR...... XX,
DATE TIME VOLUME
xx
Des"IPTIONOF 114044 WCAMg:�
TORT J.
_T #A
Q
8/24/2014 0000-0112 10
Booster compressor off line
6/21-22/2014
6/24/2014 1144-1717 367
Plant swing due to high ambient temps
Cut gas rates on wells
TOTAL 377
6/22/2014
1416-2118
224
Propane compressor & booster compressor down
Complete maintenance and restart
lPlanned Events less than or equal to 1 hour
0436-1222
226
DATE TIME VOLUME
DESCRIPTION :QrIHCIiTENTPo 'E
A 0 EL!"NW, SE
TOTAL 14
Not required for planned events which
Not required for planned events which
Complete maintenance and restart
are less than or equal to 1 hour
are less than or equal to 1 hour
IPlanned Events greater than 1 hour
TOTAL
EIDR...... XX,
DATE
TIME
VOLUME
C. IRTI
DES R ON WOMENT-A.-C-A E
,F
TAKE
ACTION N -TOWN NATUA
.-A.,
6/21-22/2014
1806-0422
439
Propane compressor & booster compressor down
Complete maintenance and restart
6/22/2014
1416-2118
224
Propane compressor & booster compressor down
Complete maintenance and restart
6/23/2014
0436-1222
226
Propane compressor & booster compressor down
Complete maintenance and restart
6/23/2014
1359-1828
214
Propane compressor & booster compressor down
Complete maintenance and restart
6123/2014
1846-0000
206
Propane compressor & booster compressor down
Complete maintenance and restart
28
TOTAL
1,309
TOTAL FLARED VOLUME
33,255
7/3/2014 1 of
TOTAL
EIDR...... XX,
WP
AN I
Volume flared less than 1 hr
180
0
0
0
180
Volume flared greater than
1,686
4
2
0
1,680
1 hr
Pilot Purge
9,870
20
13
4
9,833
Assist Gas
21,519
42
28
8
21,441
TOTAL FLARED VOLUME
33,255
66
43
12
33,134
7/3/2014 1 of
Hunt, Jennifer L (DOA)
From: AK, HSSEE Env Adv North [AKHSSEEEnvAdvNorth@bp.com]
Sent: Wednesday, June 25, 2014 5:34 AM
To: Roby, David S (DOA); Ferguson, Victoria L (DOA); Hunt, Jennifer L (DOA)
Cc: AK, OPS END Facility & FieldO&M TL; AK, OPS END Operations Lead Tech; AK, HSSEE
Env TL (North Slope); Fiedler, Anne M; Cooke, Alison D; AK, HSSEE Reg Env Data
Coordinator North
Subject: Endicott Flaring Summary June 15-22, 2014
To: Dave Roby, AOGCC
Victoria Ferguson, AOGCC
Jennifer Hunt, AOGCC
BPXA is providing courtesy notification of several planned and unplanned flaring events of greater than one hour which
occurred at the Endicott Production Facility. These events were the result of necessary maintenance on the propane
compressor and plant swings due to high ambient temperatures.
Summary of planned flaring events:
21 -June -14 18:06 (93 minutes, 33 MCF)
21- June -14 19:40 (260 minutes, 185 MCF)
22 -June -14 00:00 (262 minutes, 222 MCF)
22- June -14 14:16 (165 minutes, 9 MCF)
22- June -14 17:02 (256 minutes, 222 MCF)
23- June -14 04:36 (466 minutes, 226 MCF)
23- lune -14 13:59 (198 minutes, 162 MCF)
23- June -14 17:19 (69 minutes, 52 MCF)
23- June -14 18:46 (314 minutes, 206 MCF)
Summary of unplanned flaring events:
24 -June -14 00:00 (72 minutes, 10 MCF)
24- June -14 11:44 (333 minutes, 368 MCF)
All attempts were made to identify problems, expedite maintenance, and keep flaring & assist gas to a minimum. Given
these circumstances, we believe that we took all necessary actions in accordance with good oil field engineering practices
and conservation purposes to minimize the volume of gas released, burned, or permitted to escape to the air. These
volumes will also be reported to you on the Facility Report of Produced Gas Disposition Form (Form 10-422).
Thank you,
Rich Vicente
BPXA Environmental Advisor North
Phone (907) 659-6810
Pager 659-5272, #4313
Harmony (907) 659-6441
Alternate: Ken Miller
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000002
2. Facility Name
DIU Endicott
3. Field
Endicott
4. Operator
I BP
5. Month/Year of Disposition
I Jul -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. sold
37,535
Pool Name Pool Code Percent
7. Reinjected
9,159,138
Endicott 220100 97.76%
Sag Delta 220150 0.04%
8. Flared or vented 1 hour or less
206
Eider 220165 2.07%
Minke Tract Op 220170 0.12%
9. Flared or vented more than 1 hour (see instr.)
1,638
100.00%
10. Pilot and Purge
10,199
11. Assist Gas
23,581
12. Fuel gas used in lease operations.
989,311
13. Other (see instructions)
Official Use Only
Authorization >1 hr:
Safety
`/3 F;
W
MCF
id. TOTAL VOLUME (ITEMS 6-13)
10,221,608
Lease Use
MCF
15, NGL Gas Equivalent
36,677
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from:
—/ 11
Commissioner Date
18. Transferred to: (Express as a negative #)
19. Remarks: Block 6 includes gas sold to Badami, gas sold to Liberty and the NGL gas equivalent sold. Gas sold to the Endicott Pipeline Company is included in Block 12.
1 hereby certify that t//thh��te foregoing is true and �correct to the best of my knowledge.
��yjA�y� Manager, Production Taxes and Royalties Note: All volumes must be
Signature (��/Ik ` �Title Alaska corrected to pressure of 14.65 psia
/ and to a temperature of 60o F.
Printed Name Diane Colle Phone (907)564-5775 Date Authoritv 20 AAC25.235.
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
Jul -2014
jUnplanned Events less than or equal to 1 hour
DATE TIME DESCRIPTION OF INqQE -.T
R;GAt#SE ACTION TAKEN TqgWM AV$f
..
TOTAL 146 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
unplanned Eventsgreater than I hour
. TX:
E
DATE TIME
V00
A.
7/7-8/2014 1246-1218
642
Control system upset on Power Generation system
Added assist gas
7/18-19/2014 0543-1350
273
Booster compressor offline/NGL plant down
Propane compressor repairs in progress
7/21/2014 1144-1717
383
Rising ambient temperature
Shut in well to reduce gas in system
TOTAL
1,298
Pilot Purge
10,199
IPlanned Events less than or equal to I hour
13
4
DATE TIME
vqLmmr
WIR1110 OFINOW, Ac
K F -'N
TOTAL
60
Not required for planned events which
Not required for planned events which
35,624
737
are less than or equal to 1 hour
are less than or equal to 1 hour
IPlanned Events greater than 1 hour
DATE Time Vow
7/19/2014 1438- 1900 340
Booster compressor offline/NGL plant starup Start Booster compressor
TOTAL 340
.......
. TX:
E
%X
Volume flared less than 1 hr
206
4
0
0
202
Volume flared greater than
1,638
34
2
1
1,601
1 hr
Pilot Purge
10,199
211
13
4
9,971
Assist Gas
23,5811
488
29
10
23,054
TOTAL FLARED VOLUME
35,624
737
44
15
34,828
81612014 1 Of 1
Hunt, Jennifer L (DOA)
From: AK, HSSEE Env Adv North <AKHSSEEEnvAdvNorth@bp.com>
Sent: Wednesday, July 09, 2014 4:41 AM
To: Roby, David S (DOA); Ferguson, Victoria L (DOA); Hunt, Jennifer L (DOA)
Cc: AK, OPS END Facility & FieldO&M TL; AK, OPS END Operations Lead Tech; AK, HSSEE
Env TL (North Slope); Fiedler, Anne M; Cooke, Alison D; AK, HSSEE Reg Env Data
Coordinator North
Subject: rciifFlaring Summary July 7, 2014
To: Dave Roby, AOGCC
Victoria Ferguson, AOGCC
Jennifer Hunt, AOGCC
BPXA is providing courtesy notification of three unplanned flaring events of greater than one hour which occurred at the
Endicott Production Facility. These events were the result of a control system upset on the facility power generation
system, which required the addition of assist gas.
Summary of unplanned flaring events:
7 -July -14 12:46 (73 minutes, 106 MCF)
7 -July -14 13:50 (610 minutes, 256 MCF)
8 -July -1400:00 (738 minutes, 280 MCF)
All attempts were made to identify problems, expedite maintenance, and keep flaring & assist gas to a minimum. Given
these circumstances, we believe that we took all necessary actions in accordance with good oil field engineering practices
and conservation purposes to minimize the volume of gas released, burned, or permitted to escape to the air. These
volumes will also be reported to you on the Facility Report of Produced Gas Disposition Form (Form 10-422).
Thank you,
Rich Vicente
BPXA Environmental Advisor North
Phone (907) 659-6810
Pager 659-5272, #4313
Harmony (907) 659-6441
Alternate: Ken Miller
Hunt Jennifer L (DOA)
From: AK, HSSEE Env Adv North [AKHSSEEEnvAdvNorth@bp.com]
Sent: Wednesday, July 23, 2014 4:42 AM
To: Roby, David S (DOA); Ferguson, Victoria L (DOA); Hunt, Jennifer L (DOA)
Cc: AK, OPS END Facility & FielclO&M TL; AK, OPS END Operations Lead Tech; AK, HSSEE
Env TL (North Slope); Fiedler, Anne M; Cooke, Alison D; AK, HSSEE Reg Env Data
Coordinator North
Subject: flaring Summary July 8-23, 2014
To: Dave Roby, AOGCC
Victoria Ferguson, AOGCC
Jennifer Hunt, AOGCC
BPXA is providing courtesy notification of planned and unplanned flaring events of greater than one hour which occurred
at the Endicott Production Facility. These events were the result of propane compressor repairs and well shut ins, which
required the addition of assist gas.
Summary of unplanned flaring events:
18 -July -1405:43 (1097 minutes, 156 MCF)
19 -July -14 00:00 (386 minutes, 60 MCF)
19 -July -1406:27 (122 minutes, 14 MCF)
19 -July -14 08:39 (311 minutes, 43 MCF)
Summary of planned flaring events:
19 -July -14 14:38 (158 minutes, 161 MCF)
19 -July -14 17:17 (103 minutes, 179 MCF)
21 -July -14 09:26 (178 minutes, 383 MCF)
All attempts were made to identify problems, expedite maintenance, and keep flaring & assist gas to a minimum. Given
these circumstances, we believe that we took all necessary actions in accordance with good oil field engineering practices
and conservation purposes to minimize the volume of gas released, burned, or permitted to escape to the air. These
volumes will also be reported to you on the Facility Report of Produced Gas Disposition Form (Form 10-422).
Thank you,
Rich Vicente
BPXA Environmental Advisor North
Phone(907)659-6810
Pager 659-5272, #4313
Harmony (907) 659-6441
Alternate: Ken Miller
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000002
2. Facility Name
DIU Endicott
3. Field
Endicott
4. Operator
I BP
5. MonlhNear of Disposition
I Aug -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
11,567
Pool Name Pool Code Percent
7. Reinjected
9,105,890
Endicott 220100 97.68%
Sag Delta 220150 0.04%
8. Flared or vented 1 hour or less
471
Elder 220165 2.16%
Minks Tract Cip 220170 0.12%
9. Flared or vented more than 1 hour (see Irish.)
5,418
100.00%
10. Pilot and Purge
10,199
11. Assist Gas
23,800
12. Fuel gas used in lease operations.
954,511
13. Other (see instructions)
Official Use Only
Authorization >1 hr
Safety
i,'/f � [7
LL
MCF
14. TOTAL VOLUME (ITEMS 6-13)
10,111,856
Lease Use
MCF
15, NGL Gas Equivalent
11,011
Conservation
MCF
16. Purchased gas
Waste.
MCF
17. Transferred from:
sinner /y-
Com i [ (/ Date
18. Transferred to: (Express as a negative #)
19. Remarks: Block 6 includes gas sold to Badami, gas sold to Liberty and the NGL gas equivalent sold. Gas sold to the Endicott Pipeline Company is included in Block 12.
egoing is true and correct to the best of my knowledge.
1 hereby certify thaawrv@(
Manager, Production Taxes and Royalties Note: All volumes must be
rrected t0 pressure of 14.65 psia
signature ride Alaska Fand
/ to a temperature of 60o F.
Printed Name Diane Colle Phone (907)564-5775 Date / to20 AAC25.235.
V�
lo%-Hvl�
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
Aug -2014
Unplanned Events less than or equal to 1 hour
DATE TIME
VOLUME
DATE
TIME
TOTAL
899
AGTICENTAgYJ"i.'�tLL411AtAt�4TECAi1S>x ;I
TOTAL
TOTAL
471
Not required for unplanned events which
Not required for unplanned events which
1 hr
10
23247
are less than or equal to 1 hour
are less than or equal to 1 hour
Unplanned Events greater than 1 hour
38,962
DATE
TIME
VOLUMEOESLRIFTI(1i•1..E..
IL1N�`k.tst..AU&E. ,
itC.;'.I(1N TA1(Ei�,'.((r Bt,#Ml0A7E g.'. PSE
811/2014
0836-2030
303
Plant upset
816-7/2014
1035-0923
639
Mechanical problem with propane compressor
Propane compressor repairs in progress
8/8-11/2014
1442-1755
1,607
Propane and gas booster compressors down
Repairs in progress
8/18-1912014
1500-1908
312
Propane and gas booster compressors down
Repairs in progress
8/19-2012014
2051 -0525
33
Propane and gas booster compressors down
Repairs in progress
8/20/2014
1020-2124
56
Propane and gas booster compressors down
Repairs in progress
8/21/2014
0000-0204
40
Propane and gas booster compressors down
Repairs in progress
8/22-24/2014
1435-0540
1,141
Propane and gas booster compressors down
Repairs in progress
8/29-30/2014
0513-0000
388
Propane and gas booster compressors down
Repairs in progress
TOTAL
4,519
Planned Events less than or
eaual to 1 hour
TOTAL 0 Not required for planned events which
are less than or equal to 1 hour
Ir IPI nICU [_.VGIIW YlUdtCI UIdU I nUUr
DATE TIME
VOLUME
8/30/2014 0000-2359
899
TOTAL
899
5,293
TOTAL
Volume flared less than 1 hr
471
Volume flared greater than
5,418
1 hr
10
Pilot Purge 10,199
Assist Gas 23 800
TOTAL FLARED VOLUME 39,888
cut for TAPS slow down
Not required for planned events which
are less than or equal to 1 hour
I
1
0
460
117
6
2
5,293
221
12
4
9,962
515
28
10
23247
863
47
16
38,962
9/4/2014 1 of 1
Hunt, Jennifer L (DOA)
From: AK, HSSEE Env Adv North [AKHSSEEEnvAdvNorth@bp.com]
Sent: Tuesday, August 05, 2014 2:21 PM
To: Roby, David S (DOA); Ferguson, Victoria L (DOA); Hunt, Jennifer L (DOA)
Cc: AK, OPS END Facility & FieldO&M TL; AK, OPS END Operations Lead Tech; AK, HSSEE
Env TL (North Slope); Fiedler, Anne M; Cooke, Alison D; AK, HSSEE Reg Env Data
Coordinator North
Subject: lRoWlaring Summary August 1, 2014
To: Dave Roby, AOGCC
Victoria Ferguson, AOGCC
Jennifer Hunt, AOGCC
BPXA is providing courtesy notification of one unplanned flaring event of greater than one hour which occurred at the
Endicott Production Facility. This event was the result of a mechanical problem with the propane compressor. The
compressor has since been repaired and brought back on-line.
Summary of unplanned flaring events:
1 -August -14 08:36 (714 minutes, 303 MCF)
All attempts were made to identify problems, expedite maintenance, and keep flaring & assist gas to a minimum. Given
these circumstances, we believe that we took all necessary actions in accordance with good oil field engineering practices
and conservation purposes to minimize the volume of gas released, burned, or permitted to escape to the air. These
volumes will also be reported to you on the Facility Report of Produced Gas Disposition Form (Form 10-422).
Thank you,
Ken Miller
BPXA Environmental Advisor North
Phone(907)659-6810
Pager 659-5272, #4313
Harmony (907) 659-6441
Alternate: Rich Vicente
Hunt, Jennifer L (DOA)
From: AK, HSSEE Env Adv North [AKHSSEEEnvAdvNorth@bp.com]
Sent: Wednesday, August 13, 2014 3:17 PM
To: Roby, David S (DOA); Ferguson, Victoria L (DOA); Hunt, Jennifer L (DOA)
Cc: AK, OPS END Facility & FieldO&M TL; AK, OPS END Operations Lead Tech; AK, HSSEE
Env TL (North Slope); Fiedler, Anne M; Cooke, Alison D; AK, HSSEE Reg Env Data
Coordinator North
Subject: Endicott Flaring Summary August 6-11, 2014
To: Dave Roby, AOGCC
Victoria Ferguson, AOGCC
Jennifer Hunt, AOGCC
BPXA is providing courtesy notification of several unplanned flaring events of greater than one hour which occurred at the
Endicott Production Facility. These events were the result of a mechanical problem with the propane compressor.
Repairs are currently in progress.
Summary of unplanned flaring events:
6 -August -14 10:35 (139 Minutes, 123 MCF)
6 -August -14 13:06 (541 Minutes, 337 MCF)
6 -August -14 22:13 (107 Minutes, 10 MCF)
7 -August -14 00:00 (563 Minutes, 169 MCF)
8 -August -14 14:42 (558 Minutes, 198 MCF)
9 -August -14 00:27 (259 Minutes, 148 MCF)
9 -August -14 04:47 (559 Minutes, 184 MCF)
9 -August -14 14:08 (551 Minutes, 226 MCF)
10 -August -14 00:00 (248 Minutes, 138 MCF)
10 -August -14 04:56 (159 Minutes, 52 MCF)
10 -August -14 07:36 (984 Minutes, 316 MCF)
11 -August -14 00:00 (1,075 Minutes, 345 MCF)
All attempts were made to identify problems, expedite maintenance, and keep flaring & assist gas to a minimum. Given
these circumstances, we believe that we took all necessary actions in accordance with good oil field engineering practices
and conservation purposes to minimize the volume of gas released, burned, or permitted to escape to the air. These
volumes will also be reported to you on the Facility Report of Produced Gas Disposition Form (Form 10-422).
Thank you,
Rich Vicente
BPXA Environmental Advisor North
Phone (907) 659-6810
Pager 659-5272, #4313
Harmony (907) 659-6441
Alternate: Ken Miller
Hunt, Jennifer L (DOA)
From: AK, HSSEE Env Adv North [AKHSSEEEnvAdvNorth@bp.com]
Sent: Wednesday, August 20, 2014 3:13 AM
To: Roby, David S (DOA); Ferguson, Victoria L (DOA); Hunt, Jennifer L (DOA)
Cc: AK, OPS END Facility & FieldO&M TL; AK, OPS END Operations Lead Tech; AK, HSSEE
Env TL (North Slope); Fiedler, Anne M; Cooke, Alison D; AK, HSSEE Reg Env Data
Coordinator North
Subject: 11111011111iffiWaring Summary August 12-19, 2014
To: Dave Roby, AOGCC
Victoria Ferguson, AOGCC
Jennifer Hunt, AOGCC
BPXA is providing courtesy notification of several unplanned flaring events of greater than one hour which occurred at the
Endicott Production Facility. These events were the result of a mechanical problem with the propane compressor.
Repairs are currently in progress.
Summary of unplanned flaring events:
18 -August -14 15:00 (400 Minutes, 61 MCF)
18 -August -14 21:42 (138 Minutes, 32 MCF)
19 -August -14 00:00 (327 Minutes, 138 MCF)
19 -August -14 06:10 (778 Minutes, 81 MCF)
19 -August -14 20:51 (109 Minutes, 5 MCF)
19 -August -14 22:43 (77 Minutes, 2 MCF)
All attempts were made to identify problems, expedite maintenance, and keep flaring & assist gas to a minimum. Given
these circumstances, we believe that we took all necessary actions in accordance with good oil field engineering practices
and conservation purposes to minimize the volume of gas released, burned, or permitted to escape to the air. These
volumes will also be reported to you on the Facility Report of Produced Gas Disposition Form (Form 10422).
Thank you,
Rich Vicente
BPXA Environmental Advisor North
Phone(907)659-6810
Pager 659-5272, #4313
Harmony (907) 659-6441
Alternate: Ken Miller
Hunt, Jennifer L (DOA)
From: AK, HSSEE Env Adv North [AKHSSEEEnvAdvNorth@bp.com]
Sent: Monday, August 25, 2014 8:13 AM
To: Roby, David S (DOA); Ferguson, Victoria L (DOA); Hunt, Jennifer L (DOA)
Cc: AK, OPS END Facility & FieldO&M TL; AK, OPS END Operations Lead Tech; AK, HSSEE
Env TL (North Slope); Fiedler, Anne M; Cooke, Alison D; AK, HSSEE Reg Env Data
_Coordinator North
Subject: Endicott Flaring Summary August 20-24, 2014
To: Dave Roby, AOGCC
Victoria Ferguson, AOGCC
Jennifer Hunt, AOGCC
BPXA is providing courtesy notification of several unplanned flaring events of greater than one hour which occurred at the
Endicott Production Facility. These events were the result of a mechanical problem with the propane compressor.
Repairs to the propane compressor have been completed and it was successfully brought back on-line without excess
emissions.
Summary of unplanned flaring events:
20 -Aug -14 0:00 (113 minutes, 14 MCF)
20 -Aug -14 2:40 (165 minutes, 12 MCF)
20 -Aug -14 10:20 (664 minutes, 56 MCF)
21 -Aug -14 0:00 (124 minutes, 40 MCF)
22 -Aug -14 14:35 (250 minutes, 90 MCF)
22 -Aug -14 18:46 (314 minutes, 109 MCF)
23 -Aug -14 0:00 (74 minutes, 24 MCF)
23 -Aug -14 1:53 (860 minutes, 414 MCF)
23 -Aug -14 16:14 (103 minutes, 33 MCF)
23 -Aug -14 18:05 (216 minutes, 111 MCF)
23 -Aug -14 22:03 (117 minutes, 108 MCF)
24 -Aug -14 0:34 (78 minutes, 15 MCF)
24 -Aug -14 2:22 (198 minutes, 237 MCF)
All attempts were made to identify problems, expedite maintenance, and keep flaring & assist gas to a minimum. Given
these circumstances, we believe that we took all necessary actions in accordance with good oil field engineering practices
and conservation purposes to minimize the volume of gas released, burned, or permitted to escape to the air. These
volumes will also be reported to you on the Facility Report of Produced Gas Disposition Form (Form 10-422).
Thank you,
Ken Miller
AK, HSSEE Environmental Advisor North
W (907) 659-6810
Harmony 6441
Alternate: Rich Vicente
Hunt, Jennifer L (DOA)
From: AK, HSSEE Env Adv North [AKHSSEEEnvAdvNorth@bp.com]
Sent: Wednesday, September 17, 2014 4:09 AM
To: Roby, David S (DOA); Ferguson, Victoria L (DOA); Hunt, Jennifer L (DOA)
Cc: AK, OPS END Facility & FieldO&M TL; AK, OPS END Operations Lead Tech, AK, HSSEE
Env TL (North Slope), Fiedler, Anne M, Cooke, Alison D; AK, HSSEE Reg Env Data
Coordinator North
Subject: Endicott Flaring Summary August 25, 2014 through September 15, 2014
To: Dave Roby, AOGCC
Victoria Ferguson, AOGCC
Jennifer Hunt, AOGCC
BPXA is providing courtesy notification of planned and unplanned flaring events of greater than one hour which occurred
at the Endicott Production Facility. These events were the result of a production rate cut in response to a temporary
TAPS slow down.
Summary of unplanned flaring events:
29 -August -14 05:13 (1,127 Minutes, 388 MCF)
Summary of planned flaring events:
30 -August -14 00:00 (1,440 Minutes, 899 MCF)
All attempts were made to identify problems, expedite maintenance, and keep flaring & assist gas to a minimum. Given
these circumstances, we believe that we took all necessary actions in accordance with good oil field engineering practices
and conservation purposes to minimize the volume of gas released, burned, or permitted to escape to the air. These
volumes will also be reported to you on the Facility Report of Produced Gas Disposition Form (Form 10-422).
Thank you,
Rich Vicente
BPXA Environmental Advisor North
Phone(907)659-6810
Pager 659-5272, #4313
Harmony (907) 659-6441
Alternate: Ken Miller
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000002
2. Facility Name
DIU Endicott
3. Field
Endicott
4. Operator
I BP
5. MonthNear of Disposition
I Sep -2014
Disposition
Volume MCF
FO- production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
38,873
Pool Name Pool Code Percent
7. Reinjected
8,886,406
Endicott 220100 97.52%
Sag Delta 220150 0.08%
8. Flared or vented t hour or less
11
Eider 220165 2.27%
Minke Tract Cip 220170 0.12%
9. Flared or vented more than 1 hour (see instr.)
0
100.00%
10. Pilot and Purge
9,870
11. Assist Gas
22,350
12. Fuel gas used in lease operations.
964,992
13. Other (see instructions)
Oficial Use Only
Authorization 11 hr'.
Safety
MCFMCF
14. TOTAL VOLUME (ITEMS 6-13)
9,922,502
Lease Use
15. NGL Gas Equivalent
38,686
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from:
Commissioner Date
18. Transferred to: (Express as a negative #)
19. Remarks: Block 6 includes gas sold to Badami, gas sold to Liberty and the NGL gas equivalent sold. Gas sold to the Endicott Pipeline Company is included in Block 12.
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Manager. Production Taxes and Royalties Note: All volumes must be
Signature Title Alaska ��/ /// corrected to pressure of 14.65 psia
JD /� /(y and to a temperature of 60o F.
Printed Name Diane Coll e Phone (907)564-5775 Date / / Authoritv 20 AAC25.235.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000002
2. Facility Name
DIU Endicott
3. Field
Endicott
4. Operator
I BP
S. MonthNear of Disposition
I Oct -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. sold
35,343
Pool Name Pool Code Percent
7. Reinjected
8,996,525
Endicott 220100 98.15%
Sag Delta 220150 0.05%
8. Flared or vented 1 hour or less
793
Elder 220165 1.70%
MinkeTractOp 220170 0.11%
9. Flared or vented more than t hour (see instr)
962
100.00%
10. Pilot and Purge
10,199
11. Assist Gas
23,000
12. Fuel gas used in lease operations.
943,522
13. Other (see instructions)
Official Use OnlyMCF
Authorization >i hr:
9G Z
14. TOTAL VOLUME (ITEMS 6-13)
10,010,344MCF
rS.fety,
seUse15.
NGL Gas Equivalent
35,121
seation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from
i
-2—/�
/-2-/S-
L�� Com issioner Date
18.
18. Transferred to: (Express as a negative #)F
19. Remarks: Block 6 includes gas sold to Badami, gas sold to Liberty and the NGL gas equivalent sold. Gas sold to the Endicott Pipeline Company is included in Block 12.
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
00 A Manager, Production Taxes and Royalties Note: All volumes must be
Signature /�'�/ rifle Alaska corrected to pressure of 14.655 psia
6ft and to a temperature of 60o F.
Printed Name Diane Colley Phone (907)584-5775 Data I1//q Authority 20 AAC25.235.
rz/fq/)4
V —L
,1111=
TOTAL 793
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
Oct -2014
Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
10/5/2014 1324-1654 261
B booster down
Restarted B booster
10/15/2014 1148-1315 36
Cleaning flare
Shut lift gas to flare
TOTAL 297
Planned Events less than or equal to 1 hour
DATE TIME VOLUME
DESCRIPTION OF tt+ gp.ENT 4CAUSE
ACTION TAKEN TO EUMMA.TE CAUSE
1.nts
TOTAL 0
Not required for planned events which
Not required for planned evI 11e1.which
are less than or equal to 1 hour
are less than or equal to 1 hour
Planned Events greater than 1 hour
DATE : TIME VOLUME ;:
:
OESC;.. PTION 4�1NCtp6Nk�'�,. ,.�I
�
ACTION iAk�N:'fA �1.8VIINATE CAUSE
10/13-14/2014 1503-2052 665
Water washed A -Main Turbine
Wash completed
TOTAL 665
tOTAL
Eli[3R
t4K�
SGN1f�gJ;OTT:
Volume flared less than 1 hr 793
13
1
0
779
Volume flared greater than 962
16
1
0
945
1 hr
Pilot Purge 10,199
173
11
5
10,010
Assist Gas 23.000
390
25
11
22574
TOTAL FLARED VOLUME 34,954
592
38
16
34,308
11/6/2014
1 of 1
Hunt, Jennifer L (DOA)
From: AK, HSSEE Env Adv North [AKHSSEEEnvAdvNorth@bp.com]
Sent: Monday, October 27, 2014 12:20 PM
To: Roby, David S (DOA); Loepp, Victoria T (DOA); Hunt, Jennifer L (DOA)
Cc: AK, OPS END Facility & FieldO&M TL; AK, OPS END Operations Lead Tech; AK, HSSEE
Env TL (North Slope); Fiedler, Anne M; Cooke, Alison D; AK, HSSEE Reg Env Data
oordinator North
Subject: INMIMIaring Summary October 13 - 15, 2014
To: Dave Roby, AOGCC
Victoria Ferguson, AOGCC
Jennifer Hunt, AOGCC
BPXA is providing courtesy notification of planned and unplanned flaring events of greater than one hour which occurred
at the Endicott Production Facility. These events were the result of a shutdown of the A Main compressor for water
washing
Summary of unplanned flaring events:
15 -October 2014 07:10(164 Minutes, 93 MCF)
Summary of planned flaring events:
13 -October 2014 19:39 (556 Minutes, 505 MCF)
14 -October 2014 16:47 (96 Minutes, 89 MCF)
All attempts were made to identify problems, expedite maintenance, and keep flaring & assist gas to a minimum. Given
these circumstances, we believe that we took all necessary actions in accordance with good oil field engineering practices
and conservation purposes to minimize the volume of gas released, burned, or permitted to escape to the air. These
volumes will also be reported to you on the Facility Report of Produced Gas Disposition Form (Form 10-422).
Thank you,
Ken Miller
BPXA Environmental Advisor North
Phone(907)659-6810
Pager 659-5272, #4313
Harmony (907) 659-6441
Alternate: Rich Vicente
Name
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
a
6. Sold
1,713
7. Reinjected
9,750,343
8. Flared or vented 1 hour or less
64
9. Flared or vented more than 1 hour (see instr.)
474
10. Pilot and Purge
14,520
11. Assist Gas
17,334
12. Fuel gas used In lease operations
973,685
13. Other (see instructions)
0
14. TOTAL VOLUME (ITEMS 6.13)
10,758,133
15. NGL Gas Equivalent
0
16. Purchased gas - Rental Return Gas
0
17. Transferred from: (Off -lease Gas)
0
18. Transferred to:
0
that
Line 6Includes gas sold to Savant for fuel usage at Badami Unit.
my
as a
to pressure of 14.65 psia and to a
temperature of 80o F. Authority 20
he
Safety
4-TA'T
MCF
Lease Use
MCF
Conservation
MCF
MCF
C missioner Date
to pressure of 14.65 psia and to a
temperature of 80o F. Authority 20
OR FLARING EVENTS GREATER THAN 1 HOUR
Excess flaring necessary until
71/01/2074
724250
0290000002
11/2/2014
9:32:OOAM
2:35:00 PM
11/2/2014
N
386.0
Excess flaring due to unscheduled
compressor could be loaded
shutdown of boodosterer comcompressor.
and restarted.
Excess flaring due to well spikes
Excess flaring necessary until
11/01/2014
124250
0290000002
11/4/2014
2:01:00 AM
3:08:00 AM
11/4/2014
N
90.0
caused by kicking from wells that
well could be brought back to
were brought back on line.
normal operation.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
1. Facility Number
0290000002
2. Facility Name
DIU Endicott
3. Held
Endicott
v. upe�aw�
HILCORP ALASKA LLC
�.,u,� __ ��.,r....^•...
December 2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
276
Pool Name Pool Code Percent
7. Reinjected
10,383,694
ENDICOTT,ENDICOTTOIL 220100 97.98%
ENDICOTT. IVISHAK OIL 220150 0.05%
S. Flared or vented 1 hour or less
88
ENDIC077. EIDER OIL 1 220165 1.89%
ENDICOTT, SAGIIVISHAK OIL 220170 0.09%
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
15,004
11. Assist Gas
17,823
12. Fuel gas used in lease operations
1,046,144
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr.
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-13)
11,463,029
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas - Rental Return Gas
0
Waste:
JMCF
17. Transferred from: (Off -lease Gas)
0
Commissioner Date
1B. Transferred to:
0
19. Remarks:
Line 6 includes gas sold to Savant for fuel usage at Badami Unit.
:ertify that the foregoing is true and correct to the best of my Knowledge.
Note: All volumes must be corrected
Signature �� Title Production Supervisor pressure of 14.65 psia and to a
temperature of 600 F. Authority 20