Gas Disposition Files
Year: 2014
Facility: Northstar
Operator: BP EXPLORATION (ALASKA)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
I . Facility Number2.
0290000025
Facility Name
N1
3. Field
Northstar
4. Operator
BP
5. Month/year of Disposition
I Jan -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of Total
Volume.
6. Sold
0
Pool Name Pool Code Percent
7, Reinjected
17,564,391
Northstar 590100 94.66%
Northstar 590150 5.34%
B. Flared or vented 1 hour or less
1522
100.00%
9. Flared or vented more than 1 hour (see instr.)
1,024
10. Pilot and Purge
0
11. Assist Gas
0
12. Fuel gas used in lease operations.
0
13. Other (see instructions)0
Offidel Use Only
Authorization >i hr
Safety
�! ��
!/
MCF
14. TOTAL VOLUME (ITEMS 6-13)
17,566,937
Lease Use
MCF
15, NGL Gas Equivalent
Conservation
MCF
16. Purchased gas
706,013
Waste:
MCF
17. Transferred from.
q�2 P
Commissioner �o Date 7
ta. Transferred to (Express as a negative #)
19. Remarks Blocks 6 - 14 include only produced gas from Northstar (includes tract operations NS08 and NS34A but not gas from PBU). Gas purchased from PBU was
used as follows (all in mscf): fuel gas 660,118, pilot purge 5,456, injection 40,439.
1 hereby certify that the foregoing is true
true and correct to the best of my knowledge.
/ I / •//'/y% Note: All volumes must is corrected to
Signature (�(�/f Le L(S[(� me Manager, Production Taxes and Roy ties Alaska pressure of 14.65 psia and to a
Printed temperature of 60o F. Authority 20
Name Diane Colley Phone (907)564-5775 Date �✓ / AA 2 .235.
Northstar Gas Flaring Incident Report
1/1/2014 - 1/31/2014
Start Date / Time End Date / Time Minutes MCF Incident Cause / Description Remediation Taken Event Type Flare
Planned Less Than 1 Hour
71
Group Total 71
Planned Greater Than 1 Hour
Used test separator to de -
inventory NS19 wellhead and
1/20/2014 2:02
1/20/2014 3:49
137
flowline
None
Commissioning
HP1
Group Total
137
Unplanned
Less Than 1 Hour
1,451
Group Total
1,451
Unplanned
Greater Than 1 Hour
Blow down valve on HP
1/10/2014 12:50
1/10/2014 20:18
636
compressor leaking to flare
Repairs being planned
Other
HP1
Blow down valve on HP
1/11/2014 2:38
1/10/2014 3:56
61
compressor leaking to flare
Repairs being planned
Other
HP1
Blow down valve on HP
1/11/2014 10:46
1/11/2014 14:37
190
compressor leaking to flare
Repairs being planned
Other
HP1
Group Total
887
Report Total 2,546
NSTR FlarelncidentDetails 01-2014 FINAL.xls 2/12/2014 10:56 AM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290001
2. Facility Name
N1
3. Field
Northstar
4. Operator
BP
5. Month/Vear of Disposition
Feb -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of Total
Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
15,964,579
Northstar 590100 95.30%
Northstar 590150 4.70%
8. Flared or vented 1 hour or less
153
100.00%
9. Flared or vented more than 1 hour (see inslr.j
0
10. Pilot and Purge
0
11. Assist Gas
0
12. Fuel gas used in lease operations.
0
13. Other (see instructions)
U
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-13)
15,964,732
Lease Use
MCF
15. NGL Gas Equivalent
Conservation
MCF
16. Purchased gas
652,167
Waste:
MCF
17. Transferred from'.
Commissioner Date
18. Transferred to: (Express as a negative #)
19. Remarks Blocks 6 - 14 include only produced gas from Northstar (includes tract operations NS08 and NS34A but not gas from PBU). Gas purchased from PBU was
used as follows (all in mscf): fuel gas 608,744, pilot purge 4,928, injection 38,495.
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
64 1 n Note: All volumes must be corrected to
Signawre //n/7j rue Manager, Production Taxes and yal 1 Alaska pressure of 14.65 psia and to a
Printed �JA(• temperature of 60o F. Authority 20
Name Diane ColleyPhone (907)564-5775 Data / 1 AAC2 .2 5.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000025
2. Facility Name
N1
3. Field
Northstar
4. Operator 5. Month/Year of Disposition
I BP I Mar -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of Total
Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
17,771,864
Northstar 590100 94.25%
Northstar 590150 5.75%
8. Flared or vented 1 hour or less
56
100.00%
9. Flared or vented more than 1 hour (see instf
0
10. Pilot and Purge
0
11. Assist Gas
0
12. Fuel gas used in lease operations.
0
13. Other (see instructions)
0
Official Use Only
Authorization>1 hr
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-13)
17,771,920
Lease Use
MCF
15. NGL Gas Equivalent
Conservation
MCF
16. Purchased gas
724,294
waste:
MCF
17. Transferred from:
Commissioner Date
18. Transferred to: (Express as a negative #)
19. Remarks Blocks 6 - 14 include only produced gas from Northstar (includes tract operations NS08 and NS34A but not gas from PBU). Gas purchased from PBU was
used as follows (all in mscf): fuel gas 654,169, pilot purge 5,456, injection 64,669.
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature Title Manager, Production Taxes and Ro alties Alaska
Printed /J/�jq )/ 1
Name Diane Colley(,{!l tY Phone (907)564-5775 Date !I /
Note: All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.
J
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000025
2. Facility Name
N1
3. Field
Northstar
4. Operator 5. MonthNear of Disposition
I BP I Apr -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of Total
Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
13,602,437
Northstar 590100 93.56%
Northstar 590150 6.79%
8. Flared or vented 1 hour or less
0
100.36%
8. Flared or vented more than 1 hour (see instr.)1
l�
10. Pilot and Purge
0
11. Assist Gas
0
12. Fuel gas used in lease operations.
0
13. Other (see instructions)
ons)
0
Use Only
Authorization >l hr
Safety
2
/2
/
MCF
14. TOTAL VOLUME (ITEMS 6-13)
13,616,688
Lease Use
MCF
15. NGL Gas Equivalent
Conservation
MCF
16. Purchased gas
574,107
Waste:
MCF
17. Transferred from:
2 -ti _ it
1� Date
18. Transferred to: (Express as a negative M)
19. Remarks Blocks 6 - 14 include only produced gas from Northstar (includes tract operations NS08 and NS34A but not gas from PBU). Gas purchased from PBU was
used as follows (all in mscf): fuel gas 523,835, pilot purge 5,280, injection 44,992.
1 hereby certify that the foregoing is true and coned to the best of my knowledge.
Note: All volumes must be corrected to
Signature Title Manager, Production Taxes and oyalties Alaska pressure of 14.65 psia and to a
Printed temperature of 60o F. Authority 20
Name Dianty� Phone 907)564-5775 Date AAC25.235.
VLA'
Northstar Gas Flaring Incident Report
4/1/2014 - 4/30/2014
Start Date / Time
End Date / Time Minutes
MCF
Incident Cause / Description Remediation Taken Event Type Flare
Planned
Less Than 1 Hour
498
Group Total
498
Planned
Greater Than 1 Hour
Compression train down for
4/25/2014 2:18
4/28/2014 22:08 5510
13,753
fuel gas commissioning None Commissioning HP1
Group Total
13,753
Unplanned Less Than 1 Hour
0
Group Total 0
Unplanned Greater Than 1 Hour
0
Group Total 0
Report Total 14,251
NSTR FlarelncidentDetails 04-2014 FINAL.As 5/7/2014 10:21 AM
Hunt, Jennifer L (DOA)
From: Cooke, Alison D [Alison.Cooke@bp.com]
Sent: Friday, April 25, 2014 12:02 PM
To: Roby, David S (DOA); Ferguson, Victoria L (DOA); Hunt, Jennifer L (DOA)
Cc: AK, OPS Nstar OIM; AK, OPS Nstar O&M TL; AK, OPS Nstar Facility Engineer; Dunford,
Kyler C; AK, HSSEE Env Adv North; Fiedler, Anne M
Subject: Northstar Planned Flaring Notification April 27 - May 1, 2014
To: Dave Roby, AOGCC
Victoria Ferguson, AOGCC
Jennifer Hunt, AOGCC
BPXA is providing a courtesy notification of planned flaring that will likely exceed one hour at the
Northstar Production Facility between April 27 and May 1 during a test to switch from Prudhoe Bay
fuel gas to Northstar reservoir gas.
Northstar includes five natural gas-fired combustion turbines. The turbines consist of three identical
Solar Mars 90 turbines used to generate electricity for the facility and two identical GE LM2500
turbines used for gas compression duty. Currently the turbines operate on gas supplied by the
Prudhoe Bay Central Gas Facility (CGF). The original intent when the Northstar facility was
constructed was for the Northstar facility to switch to on-site produced natural gas, once the Northstar
production wells were producing a sufficient quality and volume of natural gas. At this time Northstar
is planning to make the switch to Northstar reservoir gas.
BPXA intends to conduct a test utilizing on-site gas in one or more of the combustion turbines from
approximately April 27 to May 1, 2014. Assuming that this test demonstrates that the natural gas
satisfies operational and emission performance requirements, BPXA intends to operate the five
turbines using Northstar reservoir gas, CGF gas, or a combination of the two, depending upon
availability of and performance using the respective gases.
On April 27, BPXA anticipates roughly an hour of flaring due to a normal operational shutdown (BESD
testing). For a short period during startup for the testing (approximately 6 hours), we anticipate flaring
up to 10 MMscfd to get the Northstar reservoir gas conditioned, which is necessary for Solar Power
Turbine and HP Compressor startup. Once the HP Compressor is online, approximately 6 MMscfd of
LP gas will continue to flare for up to 36 hours while we confirm the fuel gas is not condensing a
concerning amount of liquids in the LP Compressor sea] system. Once the LP Compressor is started,
flaring will return to normal operational levels (pilot/purge).
If you have any questions regarding this test, please feel free to contact me at 564-4838 or
alison.cookeabp.com.
Regards,
Alison
Alison D. Cooke
907-564-4838 tel.
907-440-8167 cell
907-564-5020 fax.
cookead(ftp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000025
2. Facility Name
N1
3. Field
Northstar
4. Operator 5. Month/Year of Disposition
BP May -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of Total
Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
16,358,201
Northstar 590100 91.30%
Northstar 590150 8.70/a
8. Flared or vented 1 hour or less
333
100.00%
9. Flared or vented more than 1 hour (see instr.)
4,374
10. Pilot and Purge
5,456
11. Assist Gas
0
12. Fuel gas used in lease operations.
505,360
13. Other (see instructions)
0
Oficial Use Only
Authorization >1 hr:
Safety
7 // 33
MCF
14. TOTAL VOLUME (ITEMS 6-13)
16,873,724
Lease Use
MCF
15, NGL Gas Equivalent
Conservation
MCF
16. Purchased gas
5,295
Waste:
MCF
17. Transferred from:
446
I `�-
r G —,7Date
18. Transferred to: (Express as a negative #)
I
19. Remarks Blocks 6 - 14 include only produced gas from Northstar (includes tract operations NS08 and NS34A but not gas from PBU). Gas purchased from PBU was
used as follows (all in mscf): fuel gas 5,295.
I hereby codify that the foregoing is true and correct to the best of my knowledge.
Signature / Title Manager, Production Taxes and oyal 'es 1Alaska
Printed I J 11 J/J+
Name Diane Colley Phone (907)564-5775 Date l4 Ill r I
Note: All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
C25.2 .
V,L,F
&&126114
Northstar Gas Flaring Incident Report
5/1/2014 - 5/31/2014
Start Date / Time End Date / Time Minutes MCF Incident Cause / Description
Planned Less Than 1 Hour
Group Total 0
Planned Greater Than 1 Hour
Group Total 0
Unplanned Less Than 1 Hour
333
Group Total 333
Unplanned Greater Than 1 Hour
PLC malufunction led to
5/12/2014 19:45 5/13/2014 4:35 530 4,374 unplanned plant BESD
Group Total 4,374
Report Total 4,707
Remediation Taken Event Type
Addressed PLC issues and
brough plant back online Plant Startup
Flare
LP, HP1
NSTR FlarelncidentDetails 05-2014 FINAL.xIs 6/10/2014 9:27 AM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
t. Facility Number
0290000025
2. Facility Name
N1
3. Field
Northstar
4. Operator S. Month/Year of Disposition
I BP I Jun -2014
Disposition
Volume MCF
26. For production from multiple pools, list contribution of each pool as a percent of Total
Volume.
6. Sold
U
Pool Name Pool Code Percent
7. Reinjected
15,029,034
Northstar 590100 91.35%
Northstar 590150 8.65%
8. Flared or vented 1 hour or less
456
100.00%
9. Flared or vented more than 1 hour (sea instr.)
0
10. Pilot and Purge
5,280
11. Assist Gas
0
12. Fuel gas used in lease operations.
478,558
13. Other (see instructions)
0
Official Use Only
Authorization >t hr.
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-13)
15,513,328
Lease Use
MCF
15. NGL Gas Equivalent
Conservation
MCF
16. Purchased gas
4,917
Waste:
MCF
17. Transferred from:
Commissioner Date
18. Transferred to: (Express as a negative #)
19. Remarks Blocks 6 - 14 include only produced gas from Northstar (includes tract operations NS08 and NS34A but not gas from PBU). Gas purchased from PBU was
used as follows (all in mscf): fuel gas 4,917.
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected to
Signature /1 #'Ul Title Manager, Production Taxes an Royalties Alaska pressure of 14.65 psia and to a
Printed WI ^f D �/ I temperature of 600 F. Authority 20
Name Diane Colle Phone (907)564-5775 Date / T AAC25.235.
Northstar Gas Flaring Incident Report
6/1/2014 - 6/30/2014
Start Date / Time End Date / Time Minutes MCF Incident Cause / Description Remediation Taken Event Type Flare
Planned Less Than 1 Hour
29
Group Total 29
Planned Greater Than 1 Hour
Group Total 0
Unplanned Less Than 1 Hour
427
Group Total 427
Unplanned Greater Than 1 Hour
Group Total 0
Report Total 456
NSTR FlarelncidentDetails 06-2014 FINAL.As 7/8/2014 4:28 PM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000025
2. Facility Name
N1
3. Field
Northstar
4. Operator 5. Month/Year of Disposition
I BP I Jul -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of Total
Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
15,149,760
Northstar 590100 90.81%
Northstar 590150 9.19%
8. Flared or vented i hour or less
2,974
100.00%
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
5,456
11, Assist Gas
0
12. Fuel gas used in lease operations.
495,170
13. Other (see instructions)
0
Official Use Only
Authorization >i hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.13)
15,653,360
Lease Use
MCF
15. NGL Gas Equivalent
Conservation
MCF
16. Purchased gas
5,309
Waste:
MCF
17. Transferred from:
Commissioner Date
18. Transferred to: (Express as a negative #)
19. Remarks Blocks 6 - 14 include only produced gas from Northstar (includes tract operations NS08 and NS34A but not gas from PBU). Gas purchased from PBU was
used as follows (all in mscf): fuel gas 5,309.
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
n /��1^,r Note: All volumes must be corrected to
Signature / ) /'/ /,�7j//� Title Manager, Production Taxes and oy Ities Alaska pressure of 14.65 psia and to a
Printed 444��' lhi�Xf�" / temperature of 60o F. Authority 20
Name Diane ColleyPhone (907)564-5775 Date / AAC25.235.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRnni Trim ii nIQ0f%Q1Tlnwl
1.
---- ----
Facility Number 2. Facility Name 3.
— �� .+ vw v1J1 vJ1I I%JIV
Field
0290000025 N1
4. Operator 5. Month/Year of Disposition
Disposition
Northstar
Volume MCF
BP Au -2014
20. For Production from multiple pools, list contribution of each pool as a percent of Total
6,
Sold
0
Volume.
Pool Name Pool Code Percent
7.
Reinjected
15,128,781
Northstar 590100 91.80%
Northstar 590150 8.20%
8.
Flared or vented 1 hour or less
289
100.00%
9.
Flared or vented more than 1 hour (see instr.)
188
10.
Pilot and Purge
5,456
11.
Assist Gas
0
12.
Fuel gas used in lease operations.
484,499
13.
Other (see instructions)
U
Official Use Only
Authorization>1 hr
MCF
14.
TOTAL VOLUME (ITEMS6.13)15,619,213
Safely
15,
NGL Gas Equivalent
Lease Use MCF
16.
Purchased gas
Conservation MCF
5,137
Waste:
MCF
17.
Transferred from:
/
18.
Transferred to: (Express as a negative #)
Commissioner Date
19.
Remarks Blocks 6 - 14 include only produced gas from Northstar (includes tract operations NS08 and NS34A but not gas from PBU). Gas purchased from PBU
used as follows (all in mscf): fuel gas 5,137.
was
I hemby certify that the foregoing is true and correct to the best of my knowledge.
Signature
Note: All volumes must corrected to
Title Manager, Production
Taxes and Royalties Alaska pressure of 14.65 psia and to a
is
Printed
Name Diane Colley
Phone (907)564-5775
temperature of 60o F. Authority 20
Date y (1
AAC25.235.
VL-
/o/7/if
Northstar Gas Flaring Incident Report
8/1/2014 - 8/31/2014
Start Date / Time
End Date / Time Minutes
MCF
Incident Cause / Description Remediation Taken Event Type Flare
Planned
Less Than 1 Hour
289
Group Total
289
Planned
Greater Than 1 Hour
HPB Planned Shutdown for
8/29/2014 2:25
8/29/2014 3:33 68
188
blade replacement None Commissioning HP1
Group Total
188
Unplanned
Less Than 1 Hour
Group Total 0
Unplanned Greater Than 1 Hour
Group Total 0
Report Total 477
NSTR FlarelncidentDetails 08-2014 FINAL.xls 9/9/2014 3:31 PM
Hunt, Jennifer L (DOA)
From: AK, HSSEE Env Adv North [AKHSSEEEnvAdvNorth@bp.com]
Sent: Wednesday, September 17, 2014 4:18 AM
To: Roby, David S (DOA); Ferguson, Victoria L (DOA); Hunt, Jennifer L (DOA)
Cc: AK, OPS Nstar O&M TL; AK, HSSEE Env TL (North Slope); Fiedler, Anne M; Cooke, Alison
D; AK, HSSEE Reg Env Data Coordinator North; AK, OPS Nstar Lead Tech
Subject: Northstar Flaring Summary August 29 -September 15, 2014
To: Dave Roby, AOGCC
Victoria Ferguson, AOGCC
Jennifer Hunt, AOGCC
BPXA is providing courtesy notification of one planned flaring event of greater than one hour which occurred at the
Northstar Production Facility as a result of facility commissioning.
Summary of planned flaring event:
29 -August -14 02:25 (68 minutes, 188 MCF)
All attempts were made to identify problems, expedite maintenance, and keep flaring & assist gas to a minimum. Given
these circumstances, we believe that we took all necessary actions in accordance with good oil field engineering practices
and conservation purposes to minimize the volume of gas released, burned, or permitted to escape to the air. These
volumes will also be reported to you on the Facility Report of Produced Gas Disposition Form (Form 10-422).
Thank you,
Rich Vicente
BPXA Environmental Advisor North
Phone(907)659-6810
Pager 659-5272, #4313
Harmony (907) 659-6441
Alternate: Ken Miller
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number2.
0290000025
Facility Name
N1
3. Field
Northstar
4. Operator 5. Month/Year of Disposition
I BP I Se 2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of Total
Volume.
6. Sold
U
Pool Name PoolCode Percent
7. Reinjected
15,523,765
Northstar 590100 91.29%
Northstar 590150 8.71%
8. Flared or vented 1 hour or less
579
100.00%
9. Flared or vented more than 1 hour (see instr.)
242
10. Pilot and Purge
5,280
11, Assist Gas
D
12. Fuel gas used in lease operations.
482,832
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
�
MCF
14. TOTAL VOLUME (ITEMS 6.13)
16,012,698
Lease Use
MCF
15. NGL Gas Equivalent
Conservation
MCF
16. Purchased gas
5,014
Waste:
MCF
17. Transferred from:
r_!J �I —/5 —1
Commissioner Data
18. Transferred to: (Express as a negative #)
19. Remarks Blocks 6 - 14 include only produced gas from Northstar (includes tract operations NS08 and NS34A but not gas from PBU). Gas purchased from PBU was
used as follows (all in mscf): fuel gas 5,014.
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected to
Signature Don W1 Title Manager, Production Taxes and R yal'es Alaska pressure of 14.65 psia and to a
Printed (/./- //-) / � temperature of 60o F. Authority 20
Name Diane Colley Phone (907)564-5775 Date (.� '1 AAC25.235.
L
Northstar Gas Flaring Incident Report
9/1/2014 - 9/30/2014
Start Date / Time End Date/ Time Minutes MCF Incident Cause / Description Remediation Taken
Planned Less Than 1 Hour
93
Group Total 93
Planned Greater Than 1 Hour
Group Total 0
Unplanned Less Than 1 Hour
486
Group Total 486
Unplanned Greater Than 1 Hour
9/20/2014 9:46 9/20/2014 11:08 82 242 HP -A Processor failed
Group Total 242
Report Total 821
Replaced processor and
started HP -A
Event Type Flare
Upset HP1
NSTR Flare IncidentDetaiIs 09-2014 FINAL.As 10/6/2014 2:41 PM
Hunt, Jennifer L (DOA
From: Vicente, Richard (WESTON SOLUTIONS) [Richard.Vicente@bp.com]
Sent: Tuesday, October 14, 2014 5:49 PM
To: Roby, David S (DOA); Loepp, Victoria T (DOA); Hunt, Jennifer L (DOA)
Cc: AK, OPS Nstar O&M TL; AK, HSSEE Env TL (North Slope); Fiedler, Anne M; Cooke, Alison
D; AK, HSSEE Reg Env Data Coordinator North; AK, OPS Nstar Lead Tech
Subject: Northstar Flaring Summary September 20, 2014 - October 13, 2014
To: Dave Roby, AOGCC
Victoria Ferguson, AOGCC
Jennifer Hunt, AOGCC
BPXA is providing courtesy notification of planned and unplanned flaring events of greater than one hour which occurred
at the Northstar Production Facility as a result of a processor failure on September 20, 2014 and a PLC failure on October
8, 2014.
Summary of planned flaring events:
9 -October -14 08:39 (300 minutes, 365 MCF)
9 -October -14 10:15 (183 minutes, 271 MCF)
Summary of unplanned flaring events:
20 -September -14 09:46 (82 minutes, 242 MCF)
9 -October -14 13:42 (364 minutes, 613 MCF)
9 -October -14 16:25 (156 minutes, 2,309 MCF)
All attempts were made to identify problems, expedite maintenance, and keep flaring & assist gas to a minimum. Given
these circumstances, we believe that we took all necessary actions in accordance with good oil field engineering practices
and conservation purposes to minimize the volume of gas released, burned, or permitted to escape to the air. These
volumes will also be reported to you on the Facility Report of Produced Gas Disposition Form (Form 10-422).
Thank you,
Rich Vicente
BPXA Environmental Advisor North
Phone(907)659-6810
Pager 659-5272, #4313
Harmony (907) 659-6441
Alternate: Ken Miller
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number2.
0290000025
Facility Name
N1
3. Field
Northstar
4. Operator 5. MonthNear of Disposition
BP Oct -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of Total
Volume.
6. Sold
0
Pool Name PoolCode Percent
7. Reinjected
15,012,533
Northstar 590100 90.09%
Northstar 590150 9.91%
8. Flared or vented 1 hour or less
4,048
100.00%
9. Flared or vented more than 1 hour (see instr.)
14,895
10. Pilot and Purge
5,456
11. Assist Gas
0
12. Fuel gas used in lease operations.
475,667
13. Other (see instructions)
U
Official Use Only
Authorization >1 hr:
Safety
J
MCF
14. TOTAL VOLUME (ITEMS 6-13)
15,512,599
Lease Use
MCF
15, NGL Gas Equivalent
Conservation
MCF
16. Purchased gas
5,969
Waste:
MCF
17. Transferred from:
70
ommis mer Date
18. Transferred to: (Express as a negative #)
19. Remarks Blocks 6 - 14 include only produced gas from Northstar (includes tract operations NS08 and NS34A but not gas from PBU). Gas purchased from PBU was
used as follows (all in mscf): fuel gas 5,969.
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected to
Signature/%N)A Title Manager, Production Taxes and oy Ities Alaska pressure of 14.65 psia and to a
Printed fiVf IK temperature of 60o F. Authority 20
Name Diane ColleyPhone (907)564-5775 Date /' 7�J / AAC25.235.
1,7-1-
12/11114
Northstar Gas Flaring Incident Report
10/1/2014 - 10/31/2014
Start Date / Time End Date / Time Minutes MCF Incident Cause / Description Remediation Taken Event Type Flare
Planned Less Than 1 Hour
523
Group Total 523
Planned Greater Than 1 Hour
Restarting of LP, immediate
10/9/2014 8:39 10/9/2014 13:39 300 7,131 shutdown Adjusted wells accordingly LP Purge Gas LP, HP1
Adjusted well set to Equipment
10/9/2014 12:28 10/9/2014 14:30 123 197 Took down HPA for water wash mininmize flaring Outage HP1
Group Total 7,328
Unplanned Less Than 1 Hour
3,525
Group Total 3,525
Unplanned
Greater Than 1 Hour
10/9/2014 13:42
10/9/2014 19:46
364
613
Restarting HP -A
Adjusted wells accordingly
HPA Purge Gas LP
10/9/2014 16:25
10/9/2014 19:01
156
2,309
Restarting LP
Adjusted wells accordingly
LP Purge Gas
HP1
HP -B: lost 5th stage seal.
Took evasive action and
Equipment
10/14/2014 6:14
10/14/2014 9:27
192
1,577
resulting in shutdown
began cutting production
Outage
HP1
Lost LP Compressor due to B
Adjusted well set to minimize
Equipment
10/18/2014 1:03
10/18/2014 14:23
911
2,407
Solar failure
flaring
Outage
LP
Lost LP Compressor due to B
Adjusted well set to minimize
Equipment
10/18/2014 16:56
10/18/2014 19:22
147
308
Solar failure
flaring
Outage
HP1
Lost LP Compressor due to B
Adjusted well set to minimize
Equipment
10/18/2014 20:21
10/18/2014 23:40
199
353
Solar failure
flaring
Outage
HP1
Group Total
7,567
Report Total 18,943
NSTR FlarelncidentDetails 10-2014 FINAL.xls 11/6/2014 2:27 PM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
11e1. a. Operator 5. Month/Year of Disposition
0290000025 Northstar Northstar HILCORP ALASKA LLC I November 2014
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
6. Sold
0
7. Reinjected
13,747,394
8. Flared or vented 1 hour or less
949
9. Flared or vented more than 1 hour (see Instr.)
397
10. Pilot and Purge
5,309
11. Assist Gas
0
12. Fuel gas used in lease operations
448,920
13. Other (see Instructions)
0
14. TOTAL VOLUME (ITEMS 6-13)
14,202,969
15. NGL Gas Equivalent
0
16. Purchased gas:
850
17. Transferred from: (Off -lease Gas)
0
18. Transferred to:
0
19. Remarks:
Gas purchased from BPXA PBU for fuel at Caribou Crossing 850
correct to the best of
use
397 -
l _C7_�
Note: Aff volumes must be corrector
to pressure of 14.65 psis and to a
temperature of 600 F. Authority 20
VTr—
OR FLARING EVENTS GREATER THAN 1 HOUR
a
11/01/2014
124250
0290000025
11/2/2014
9:11:OOAM
10:12AOAM
11/2/2014
N
161.0
ing
Excess de to unscheuled
shutdownrof HPUA caused by loose
Excess necessary until
operations could secure the
accoustics card.
card into place.
11/01/2014
124250
0290000025
11/14/2014
2:10:00 AM
3:27:00 AM
11/14/2014
N
236.0
Excess due to
shutdowln aring of HP -A due to high aldaI
Othe unit could benecessary
FS andtil
vibration of the 5th stage compressor,
blown down.
JAN 2 1 2015
STATE OF ALASKA A" OGCV
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000025
2. Facility Name
Northstar
3. Field 4. Operator
Northstar I HILCORP ALASKA LLC
5. MonlhlYear of Disposition
December 2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
18,147,393
NORTHSTAR, NORTHSTAR OIL 590100 90.23%
NORTHSTAR, KUPARUK C UNOEF OIL 590150 9.77%
8. Flared or vented 1 hour or less
241
9. Flared or vented more than 1 hour (see instr.)
5,445
10. Pilot and Purge
5,486
11. Assist Gas
0
12. Fuel gas used in lease operations
546,054
Authorization >1 hr: Safety MCF
MCF
Lease Use
MCF
Conservation
13. Other (see instructions)
0
14. TOTAL VOLUME (ITEMS 6.13)
18,704,619
15. NGL Gas Equivalent
0
16. Purchased gas:
922
Waste: MCF
17. Transferred from: (ON -lease Gas)
0
Commissioner Date
18. Transferred to:
0
19. Remarks:
Gas purchased from BPXA PBU for fuel at Caribou Crossing 922
is true and correct to the best of my
Title
Phone
Ne: All volumes must be corrected
pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
RECEIVED
2015
OR FLARING EVENTS GREATER THAN 1 HOUR
Actio T rt
R tDate O No Facili No Date Flared StartTime EndingTime End Date Planned MCF Description of Flaring Event V
Excess flaring due to flaring off of
Excess flaring necessary until
12/01/2014
124250
0290000025
12/27/2014
12:19:00 PM
1:19:00 PM
12/27/2014
P
271.9
Test Separator in effort to stimulate
stimulate effort was complete.
NS -33.
Excess flaring due to flaring off of
Excess flaring necessary until
12/01/2014
124250
0290000025
12/27/2014
1:21:00 PM
6:26:00 PM
12/27/2014
P
1230.6
Test Separator in effort to stimulate
stimulate effort was complete.
NS -33.
Excess flaring due to flaring off of
Excess flaring necessary until
12/01/2014
124250
0290000025
12/30/2014
6:15:00 AM
3:25:00 PM
12/30/2014
P
2563.7
Test Separator in effort to stimulate
stimulate effort was complete.
NS -33.
Excess flaring due to flaring off of
Excess flaring necessary until
12/01/2014
124250
0290000025
12/31/2014
8:01:00 AM
11:21:00 AM
12/31/2014
P
762.3
Test Separator in effort to stimulate
stimulate effort was complete.
NS -33.
Excess flaring due to flaring off of
Excess flaring necessary until
12/01/2014
124250
0290000025
12/31/2014
11:22:OOAM
2:19:00 PM
12/31/2014
P
616.6
Test Separator in effort to stimulate
stimulate effort was complete.
NS -33.