Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPBU CCP/FFCU Gas DispositionState of Alaska AOGCC Gas Disposition Files Year: 2014 Facility: PBU CCP/FFGU Operator: BP EXPLORATION (ALASKA) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCPIFFGU 3. Field PBU - EOA 4. Operator BP 5. Month/year of Disposition I January -2014 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 1,396,030 Pool Name Pool Code Percent 7. Reinjected 223,620,017 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 155 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 35,482 11. Assist Gas 0 12. Fuel gas used in lease operations. 6,378,927 13. Other (see instructions) 10 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6.12) 231,430,621 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: CGF & FS1 231,430,621 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Nolthstar; Block 12: Includes COTP Non-PBU Fuel Gas = 1,835 mscf; Block 18: Fuel Gas to LPC = 10 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. AA Signature Title Manager Production Taxes and Royalties Alaska Note: All volumes must be corrected to pressure of 14.65 psla and t0 a temperature of 60o F. Authority 20 AAC25.235. Z Printed Name Diane COII Phone (907) 564-5775 Date J b Form 10422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCP/FFGU 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition February -2014 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 1,286,624 Pool Name Pool Code Percent 7. Reinjected 195,586,576 PRUDHOE 640150 100.00 8. Flared or vented 1 hour or less 4,178 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 30,669 11. Assist Gas 0 12. Fuel gas used in lease operations. 5,900,691 13. Other (see instructions) 1,156 Official Use Only Authorization >l hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 202,809,894 Lease Use MCF 15. NGL Gas Equivalent Q Conservation MCF 16. Purchased gas Q Wase MCF 17. Transferred from: CGF & Est 202,809,894 18. Transferred to: (Express as a negative #) Q Commissioner Date 19. Remarks. Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar, Block 12: Includes COTP Non-PBU Fuel Gas = 2,357 mscf; Block 18: Fuel Gas to LPC = 1,156 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. )f gy)e Note: All volumes must be corrected Signature rf K. ,(((� Title Mana er Production Taxes and Ro Ities Alaska to pressure Of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date / 1 AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT- CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT February 2014 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events <=1 hr Not required for unplanned events <= 1 hr TOTAL 0 Unplanned Events greater than 1 hour DATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf 2/2/2014 2/2/2014 2/8/2014 2/8/2014 2/8/2014 2/9/2014 2/17/2014 2/21/2014 2/22/2014 2/22/2014 2/22/2014 2/22/2014 2/22/2014 2/22/2014 2/22/2014 2/22/2014 2/22/2014 2/23/2014 2/23/2014 2/23/2014 2/23/2014 2/23/2014 2/24/2014 1340-1345 1415-1420 0230-0330 0720-0730 1015-1040 1425-1450 1708-0738 0617-0649 0020-0025 0310-0315 1247-1252 1325-1330 1353-1358 2030-2035 2125-2130 2214-2219 2347-2352 0157-0202 0434-0439 0653-0658 2118-2123 2320-2325 0103-0108 45 See attachments 8 304 23 28 518 230 325 156 11 135 45 45 77 80 156 156 11 135 14 77 156 11 See attachments Page 1 3/12/2014 4:56 PM BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT- CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT February 2014 2/24/2014 1639-1644 156 2/24/2014 1707-1712 45 2/24/2014 1743-1748 14 2/26/2014 1154-1159 156 2/27/2014 0149-0154 11 2/27/2014 2138-2143 77 2/28/2014 0026-0031 408 2/28/2014 0114-0119 152 2/28/2014 0458-0503 152 2/28/2014 0758-0803 152 2/28/2014 1916-1921 109 TOTAL 4,178 See attachments TOTAL 0 See attachments Page 2 3/12/2014 4:56 PM TOTAL Unplanned Events < 1 Hour 0 Unplanned Events> 1 Hour 0 Planned Events< l hour and not 4,178 exceeding 5,000 MCF Planned Events> 1 hour or 0 exceeding 5,000 MCF Pilot Purge 30,669 Assist 0 TOTAL FLARED VOLUME 34,847 See attachments Page 2 3/12/2014 4:56 PM Flare Start Date 02/01/2014 Flare End Date 02/28/2014 CCP Flare Report Total Volume (MSCF) 4178 Report Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 14-15 Controlled Blowdown 02/02/2014 1:40:00 pm 1:45:00 pm 5 min No No Yes BP1\RUIZSO 45 Determination Cause T\C 1801 pressure tested then depressured forstart up. Action Taken 1801 T/C depressurized and shut down. 14-15 Controlled Slowdown 02/02/2014 2:15:00 pm 2:20:00 pm 5 min No No Yes BP1 V2UIZS0 8 Determination Cause 'RC 1801 depressured from crank pressure to 50 prig. Action Taken 1810 T/C depressurization completed. 14-41 Controlled Blowdown 02/08/2014 2:30:00 am 3:30:00 am 60 min No No Yes Determination Cause FFGU isolated and depressured to HP flare via P17 -AV. No BPI\MANGMM—� 28 Action Taken FFGU depressurization complete. 14-58 Controlled Blowdown 02/22/2014 12:47:00 pm 12:52:00 pm 5 min No No BP1\RUIZSO 1441 Controlled Blowdown 02/08/2014 7:20:00 am 7:30:00 am 10 min No No Yes Determination Cause Vented FFGU to HP flare via P17 -AV. Action Taken FFGU depressurization complete. 14-41 Controlled Blowdown 02/08/2014 10:15:00 am 10:40:00 am 25 min No No Yes Determination Cause Vented FFGU to HP flare via P17 -AV. Action Taken FFGU depressurization complete. 14-43 Controlled Blowdown 02/09/2014 2:25:00 pm 2:50:00 pm 25 min No No Yes Determination Cause Opened P37 -IC valve to HP Flare to maintain Flare pilots after depressuring FFGU nitrogen purge. Action Taken P37 -IC valve closed and flaring has stopped. BPI\MANGMM 304 Determination Cause T\C 1809 shutdown for planned maintenance BPI\MANGMM 23 14-58 Controlled Blowdown 02/22/2014 3:10:00 am 3:15:00 am 5 min No No BPI\MANGMM—� 28 Action Taken 1809 T/C depressurized and shut down. 14-58 Controlled Blowdown 02/22/2014 12:47:00 pm 12:52:00 pm 5 min No No BP1\RUIZSO 518 14-50 Controlled Blowdown 02/17/2014 5:08:00 pm 5:38:00 pm 30 min No No Yes BPI\MANGMM Determination Cause Opened P37 -AV to provide sufficient gas to the HP flare to keep it lit while blowing down nitrogen thru P17 -AV in FFGU. Action Taken Flaring complete 230 14-57 Controlled Blowdown 02/21/2014 6:17:00 am 6:49:OOam 32min No No Yes BP1\TOWNER 325 Determination Cause P37 -AV Operation Flare valve opened to prevent HP flare from being extinguished while depressunng FFGU with nitrogen. P37 -AV flaring is captured on meter 405. Action Taken FFGU depressured to zero PSI and P37 -AV was dosed. 14-58 Controlled Blowdown 02/22/2014 12:20:00 am 12:25:00 am 5 min No No Determination Cause T\C 1809 shutdown for planned maintenance Action Taken 1809 T/C depressurized and shut down. 14-58 Controlled Blowdown 02/22/2014 3:10:00 am 3:15:00 am 5 min No No Determination Cause T\C 1809 spin cooling Action Taken 1809 T/C depressurized and shut down. 14-58 Controlled Blowdown 02/22/2014 12:47:00 pm 12:52:00 pm 5 min No No Determination Cause 1807 TIC shutdown for SILOPA/check valve testing. Normal stop. Action Taken 1807 TIC stopped depressuring at 50 PSI. 14-58 Controlled Blowdown 02/22/2014 1:25:00 pm 1:30:00 pm 5 min No No Determination Cause 1807 T/C vented down from 227 PSI to 50 PSI after compressor check valve leak test. Yes BP1\KOSMBO 156 Yes BP1\KOSMBO 11 Yes BP7\TOWNER Yes BP1\TOWNER 135 45 Generated 03/04/2014 2:16:08PM Page 1 of 9 Flare StartDate 02/01/2014 Flare End Date 02/28/2014 Action Taken 1807 TIC venting stopped at 50 PSI. 14-58 Controlled Slowdown 02122/2014 1:53:00 pm 1:58:00 pm 5 min No No Determination Cause 1807 T/C vented down from 490 PSI to 50 PSI after compressor check valve leak test. Action Taken 1807 TIC venting stopped at 50 PSI. 14-58 Controlled Slowdown 02/22/2014 8:30:00 pm 8:35:00 pm 5 min No No Determination Cause T\C 1809 pressure test for PSV work 14-60 Comrolled Blowdown 02/24/2014 4:39:00 pm 4:44:00 pm 5 min No No 14-59 Controlled Blowdown 02/23/2014 4:34:00 am 4:39:00 am 5 min No Action Taken 1809 TIC depressurization completed. 1812 TIC depressured to 50 PSI and stopped venting. Action Taken 1802 T/C depressurized and shut down. Determination Cause 14-58 Controlled Blowdown 02/22/2014 9:25:00 pm 9:30:00 pm 5 min No No Determination Cause T\C 1809 shutdown duetoa 90 Sec seal oil diff trip 14-59 Controlled Blowdown 02/23/2014 9:18:00 pm 9:23:00 pm 5 min No Action Taken 1809 depressurized and shut down. Action Taken 1810 T/C depressurization completed. 14-58 Controlled Slowdown 02/22/2014 10:14:00 pm 10:19:00 pm 5 min No No Determination Cause T\C 1809 shutdown due to valve out of position on startup Action Taken 1809 T/C depressurization completed. 14-58 Controlled Blowdown 02/22/2014 11:47:00 pm 11:52:00 pm 5 min No No Determination Cause T\C 1810 shutdown for planned maintenance sit lops Action Taken 1810 T/C depressurized and shut down. 14-59 Controlled Blowdown 02/23/2014 1:57:00 am 2:02:00 am 5 min No Determination Cause -RC 1810 spin cooling Action Taken Action Taken 1810 T/C depressurized and shut down. 14-60 Comrolled Blowdown 02/24/2014 4:39:00 pm 4:44:00 pm 5 min No No 14-59 Controlled Blowdown 02/23/2014 4:34:00 am 4:39:00 am 5 min No Determination Cause T\C 1802 shutdown for planned maintenance 1812 TIC depressured to 50 PSI and stopped venting. Action Taken 1802 T/C depressurized and shut down. Determination Cause 14-59 Controlletl Blowdown 02/23/2014 6:53:00 am 6:58:00 am 5 min No Determination Cause 1802 TIC spin cooling completed. ESD stop given. Action Taken 1802 T/C depressured to zero PSI. 14-59 Controlled Blowdown 02/23/2014 9:18:00 pm 9:23:00 pm 5 min No Determination Cause T/C 1810 pressured up for PSV leak test Action Taken 1810 T/C depressurization completed. 14-59 Controlled Blowdown 02/23/2014 11:20:00 pm 11:25:00 pm 5 min No Determination Cause M 1810 shutdown for #2 bearing lube oil leak Action Taken 1810 T/C depressurized and shut down. No No No No Yes BP1\TOWNER 45 Yes BP1\KOSMBO 77 Yes BP1\KOSMBO 80 Yes BP1\KOSMBO 156 Yes BP1\KOSMBO 156 Yes BP1\KOSMBO 11 Yes BP1\KOSMBO 135 Yes BP1\TOWNER 14 Yes BP1\KOSMBO 77 No Yes BP1\KOSMBO 156 14-60 Controlled Blowdown 02/24/2014 1:03:00 am 1:08:00 am 5 min No No Determination Cause -RC 1810 spin Cooling Action Taken 1810 T/C depressurized and shut down. 14-60 Comrolled Blowdown 02/24/2014 4:39:00 pm 4:44:00 pm 5 min No No Determination Cause 1812 TIC shutdmn for SIL/LOPA testing. Depressured to 50 PSI. Action Taken 1812 TIC depressured to 50 PSI and stopped venting. 1460 Controlled Blowdown 02/24/2014 5:07:00 pm 5:12:00 pm 5 min No No Determination Cause 1802 T/C pressure tested up 300 PSI then depressure to 50 PSI for leak testing. Action Taken 1802 T/C stopped venting at 50 PSI. I 14-60 Controlled Blowdown 02/24/2014 5:43:00 pm 5:48:00 pm 5 min No No Generated 03/04/2014 2:15:08PM Yes BP1\KOSMBO 11 Yes BP1\TOWNER 156 Yes BPI\TOWNER 45 Yes BP1\KOSM80 14 Page 2 of 9 Flare Start Date 02/01/2014 Flare End Date 02/28/2014 Determination Cause -RC 1802 shutdown because it wouldn't go past crank Action Taken 1802 TIC depressurized and shut down. 14-61 Controlled Blowdown 02/26/2014 11:54:00 pm 11:59:00 pm 5 min No No Determination Cause T/C 1811 shut down for SIL/LOPA testing and maintenance. Depressured to 75 psi. Action Taken T/C 1811 depressurization complete. 14-62 Controlled Blowdown 02/27/2014 149:00 am 1:54:00 am 5 min No No Determination Cause T/C 1811 depressure from spin cool too psig. Action Taken T/C 1811 depressurization complete. 14-62 Controlled Blowdown 02/27/2014 9:38:00 pm 9:43:00 pm 5 min No No Determination Cause Pressure tested T/C 1811. Depressured from full suction pressure to 64 psi. Action Taken T/C 1811 depressurization complete. 14-64 Controlled Blowdown 02/28/2014 12:26:00 am 12:31:00 am 5 min No No Determination Cause T/C 1878 shut down for SIL/LOPA testing and maintenance. Action Taken TIC 1878 depressurization complete. 14-64 Controlled Blowdown 02/28/2014 1:14:00 am 1:19:00 am 5 min No No Determination Cause 1878 TIC depressured from 177 PSI Were PSI. Action Taken 1878 T/C stopped depressuring at zero PSL 14-64 Controlled Blowdown 02/28/2014 4:58:00 am 5:03:00 am 5 min No No Determination Cause T/C 1878 spin cool ESD'd for low level in seal oil overhead tank. Action Taken T/C 1878 depressurization complete. 14-64 Controlled Blowdown 02/28/2014 7:58:00 am 8:03:00 am 5min No No Determination Cause 1878 TIC shutdown after spin cooling. Depressured to zero PSI. Action Taken 1878 T/C venting stopped at zero PSI. 14-64 Controlled Blowdown 02/28/2014 7:16:00 pm 7:21:00 pm 5 min No No Determination Cause T/C 1878 depressured for water wash. Action Taken TIC 1878 depressunzation complete. - Generated 03/04/2014 2:15:08PM Yes BPI\GAMBHO 156 Yes BPI\GAMBHO 11 Yes BPI\GAMBHO 77 Yes BP1\GAMBHO 408 Yes BP1\TOWNER 152 -Yes BP1\GAMBHO-- - 152 Yes BP1\TOWNER 152 Yes BPi\GAMBHO 109 Total volume (MSCF) 4178 Page 3 of 9 Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Tuesday, February 18, 2014 9:56 AM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; Burgess, David H; Hauger, Wayne A; AK, OPS CCP CGF OSM; AK, OPS CCP OTL; AK, OPS FS2 Facility OTL; AK, OPS FS2 OSM; AK, OPS FS1 OSM; AK, OPS FS1 Facility OTL; AK, HSSEE Env Adv Central; AK, HSSEE Env Adv East; AK, OPS PCC EOC TL Subject: Gas flaring events at FS2, FS1, CCP To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC iennifer hunt(a)alaska.00v dave.robvCa).alaska.gov victoria.ferousonCZDalaska.gov From: Kellie Okonek, GPB Production Optimization Team Leader A flaring event occurred at FS2 starting at 02/04/2014 10:30 and stopping at 02/04/2014 13:30 with a volume of 172 (MSCF). The event lasted for 180 minutes and was due to blowdown of 16D commonline for planned maintenance. A flaring event occurred at CCP starting at 02/08/2014 02:30 and stopping at 02/08/2014 06:30 with a volume of 304 (MSCF). The event lasted for 60 minutes and was due to FFGU depressurization when supply was switched back to CGF FFG. A flaring event occurred at FS1 starting at 02/09/2014 16:20 and stopping at 02/09/2014 16:35 with a volume of 5573 (MSCF). The event had a volume greater than 5000 (MSCF) and was due to LPS compressors shutdown due to supply unit failure. Flaring stopped when the power supply was replaced and the compressors were loaded. Please let me know if you have any questions. Kellie Okonek (alt. Travis Rybicki) PCC/EOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akopsi)cceoctl@bp.com M STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCP/FFGU 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition March -2014 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 1,386,827 Pool Name Pool Code Percent 7. Reinjected 218,224,905 PRUDHOE 640150 100.00% 8. Flared or vented l hour or less 1,595 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 34,988 11. Assist Gas U 12. Fuel gas used in lease operations. 6,089,597 13. Other (see instructions) 29 Official Use Only Authorization >i hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6.12) 225,737,941 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: CGF & FS1 225,737,941 Commissioner Date 18. Transferred to: (Express as a negative #) O 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar; Block 12: Includes COTP Non-PBU Fuel Gas = 6,362 mscf; Block 18: Fuel Gas to LPC = 29 mscf I hereby certify that,t thhe��� foregoing is true and correct to the best of my knowledge. /,t ^ - I Note: All volumes must be corrected Signature /` —��wt l �`^^�-OY1. Title Mana er Production Taxes and Ro allies Alaska to pressure of 14.65 psis and to a (,�, temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date ` AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCPIFFGU 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition Aril -2014 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 1,034,402 Pool Name Pool Code Percent 7. Reinjected 205,983,765 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 946 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 32,134 11. Assist Gas 0 12. Fuel gas used in lease operations. 6,001,319 13. Other (see instructions) 12,497 Official Use Only Authorization >t hr Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 213,065,063 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: CGF 8 FS1 213,065,063 18. Transferred to: (Express as a negative #) 0 Commissioner Date 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar; Block 12: Includes COTP Non-PBU Fuel Gas = 7,032 mscf; Block 18: Fuel Gas to LPC = 12,497 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. & , /t ,171D�� Signature //�( I ,(/�/ Tiee Mana er Production Taxes and Ro alties Alaska Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Diane Colley Phone (907) 564-5775 Date / Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 12`UName PBU CCPIFFGU 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition I May -2014 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total volume. 6. Sold 478,825 Pool Name Pool Code Percent 7. Reinjected 186,174,929 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 3,037 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 34,420 11. Assist Gas O 12. Fuel gas used in lease operations. 5,731,666 13. Other (see instructions) 9 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 192,422,886 Lease Use MCF 15. NGL Gas Equivalent O Conservation MCF 16. Purchased gas O Waste: MCF 17. Transferred from: CGF 8 FSI 192,422,886 18. Transferred to: (Express as a negative #) 0 Commissioner Date 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar; Block 12: Includes COTP Non-PBU Fuel Gas = 4,988 mscf; Block 18: Fuel Gas to LPC = 9 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. /J/j/f) Signature w1 �C, Title Manager Production Taxes and Ro alties Alaska Note: All volumes must be corrected to pressure Of 14.65 psis and to a temperature of 60o F. Authority 20 AAC25.235. l %� / Printed Name Diane ColleyPhone (907) 564-5775 Date (O Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number2. 0290000000 Facility Name PBU CCP/FFGU 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition I June -2014 Disposition Volume MCF 20. For production /mm multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 443,796 Pool Name Pool Code Percent 7. Reinjected 186,508,390 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 1,409 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 33,270 11. Assist Gas 0 12. Fuel gas used in lease operations. 5,591,438 13. Other (see instructions) 60,191 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 192,638,494 Lease Use MCF 15, NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas U Waste: MCF 17. Transferred from: CGF & FS1 192,638,494 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar; Block 12: Includes COTP Non-PBU Fuel Gas = 1,005 mscf; Block 18: Fuel Gas to LPC = 60,191 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. /,1•,/,//�,,/t/,r'' Note: All volumes must be corrected Signature (.'Ld��-//GI Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and t0 a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date I AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCP/FFGU 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition July -2014 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 449,758 Pool Name Pool Code Percent 7. Reinjected 126,755,130 PRUDHOE 640150 100.00% 8. Flared or vented l hour or less 5,994 9. Flared or vented more than 1 hour (see instr.) 10,000 10. Pilot and Purge 34,377 11. Assist Gas 0 12. Fuel gas used in lease operations. 5,144,437 13. Other (see instructions) 6 Official Use Only Authorization >7 hr Safety MCF 14. TOTAL VOLUME (ITEMS 6.12) 132, 399,696 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: CGF & FSI 132,399,696 41 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar; Block 12: Includes COTP Non-PBU Fuel Gas = 0 mscf; Block 18: Fuel Gas to LPC = 0 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. irM�� Note: All volumes must be corrected Signature el LY (.66�/ Title Manager Production Taxes an Ro pities Alaska to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235. ✓Z -F- 4/ qjt#- Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate DATE WIP TOTAL 0 TOTAL 0 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT July 2014 Not required for unplanned events <= 1 hr DESCRIPTION OF INCIDENT & See attachments Not required for unplanned events <=1 hr See attachments Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT&CAUSE ACTION TAKENTO ELIMINATE CAUSE 7/10/2014 2023-2025 135 See attachments See attachments 7/11/2014 1505-1510 8 7/12/2014 1145-1150 408 7/18/2014 0650-0655 420 7/21/2014 0834-0839 156 7/22/2014 0205-0210 135 7/22/2014 0435-0440 8 7/22/2014 1120-1125 156 7/22/2014 1332-1337 11 7/23/2014 0122-0127 135 7/23/2014 0359-0404 14 7/23/2014 0802-0807 408 7/23/2014 1100-1105 109 7/23/2014 1210-1215 135 7/24/2014 0045-0050 135 7/24/2014 0305-0310 14 7/24/2014 2211-2226 885 7/24/2014 2242-2247 30 7/24/2014 2252-2335 2,537 7/25/2014 0100-0105 30 7/25/2014 0135-0140 109 7/25/2014 0445-0450 8 7/29/2014 0407-0412 8 TOTAL 5,994 Page 1 8/14/2014 2:23 PM 7/18/2014 0715-1207 TOTAL Unplanned Events <1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT- CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT July 2014 10,000 See attachments 10,000 TOTAL 0 0 5,994 10,000 34,377 0 50,371 See attachments Page 2 8/14/2014 2:23 PM Flan: Start Date 07101/2014 Flare End Date 07/31/2014 CCP Flare Report Total Volume (MSCF) 15994 Report Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 14-238 Controlled Blowdown 07/10/2014 8:23:00 pm 8:28.00 pm 5 min No No Yes Determination Cause T/C 1805 OSD tripped on F95 -AV valve out of position. BPI\TOWNER Action Taken T/C 1805 stopped flaring when it depressured down to 50 PSI. No 14-239 Controlled Blowdown 07/11/2014 3:05:00 pm 3:10:00 pm 5 min No No Yes Determination Cause TC 1805 given a stop after water wash complete. Determination Cause TC 1810 depressured for water wash Action Taken 1805 T/C depressurization completed. 14-242 Controlled Blowdown 07/12/2014 11:45:00 am 11:50:00 am 5 min No No Yes Determination Cause TC 1876 shutdown to change out computer. Unit was unloaded and no impact. Action Taken 1876 T/C depressurization completed. No No Yes BP1\BRAUJW 14-254 Controlled Slowdown 07/18/2014 6:50:00 am 6:55.00 am 5 min No No Yes Determination Cause TC 1876 shutdown for CGF TAR. Not needed and used to assist in 60" WOA transit line blowdown Action Taken T/C 1876 depressurization completed. 14-254 Controlled Blowdown 07/18/2014 7:15:00 am 12:07:00 pm 292 min No No Yes Determination Cause TIC 1876 used to assist CGF with blowing down the 60" WOA transit line Action Taken 60" WOA transit line depressuring completed using T/C 1876 No 14-261 Controlled Blowdown 07/21/2014 8:34:00 am 83900 am 5 min No No Yes Determination Cause TC 1812 depressured for water wash Determination Cause 1808 T/C shutdown for walerwash. Action Taken T/C 1812 depressurization completed. 14-263 Controlled Blowdown 07/22/2014 2:05:00 am 21000 am 5 min No No Yes Determination Cause TIC 1807 shutdown for water wash. Action Taken T/C 1807 depressured down to 50 PSI then stopped. BP1\TOWNER 135 BP1\BAKERWF 8 BPIOAKERWF 408 BPI\BRAUJW 420 BP1\BRAUJW 10000 BP1\BRAUJW 156 BPI\TOWNER 135 14-263 Controlled Blowdown 07/22/2014 4:35:00 am 44000 am 5 min Determination Cause TIC 1807 stopped from spin cooling. Action Taken T/C 1807 depressured down to 50 PSI then stopped. No No Yes BPI\TOWNER 8 14-263 Controlled Slowdown 07/22/2014 11:20:00 am 11:25:00 am 5 min No No Yes BP1\BRAUJW 156 Determination Cause TC 1810 depressured for water wash Action Taken TIC 1810 depressurization completed. 14-263 Controlled Blowdown 07/22/2014 1:32:00 pm 1:37:00 pm 5 min No No Yes BP1\BRAUJW 11 Determination Cause TC 1810 spin cooling Action Taken TIC 1810 depressurization completed. 14-264 Controlled Blowdcwn 07/23/2014 1:22:00 am 1:2700 am 5 min No No Yes BP1\TOWNER 135 Determination Cause 1808 T/C shutdown for walerwash. Action Taken 1808 T/C depressured down to 50 PSI then stopped. 14-264 Controlled Blowdown 07/23/2014 3:59:00 am 4:04:00 am 5 min No No Yes SP1\TOWNER 14 Generated 08/04/2014 11:24:17AM Page 1 of 11 Flare Start Date 07/01/2014 Flare End Date 07/31/2014 Determination Cause 1808 T/C shutdown from spin cooling. Action Taken 1808 TIC depressured to zero PSI and stopped. 14-264 Controlled Blowdown 07/23/2014 8:02:00 am 8:07:00 am 5 min No No Yes BP1\BRAUJW 408 Determination Cause TC 1878 shutdown for planned maintenance Action Taken T/C 1878 depressurization completed. 14-264 Controlled Blowdown 07/23/2014 11:00:00 am 11:05:00 am 5 min No No Yes BP1\BRAUJW 109 Determination Cause -RC 1878 shut down from spin cooling Action Taken T/C 1878 depressurization completed. 14-264 Controlled Blowdown 07/23/2014 12:10:00 pm 12:15:00 pm 5 min No No Yes BP1\BRAUJW 135 Determination Cause T\C 1804 depressured for water wash Action Taken T/C 1804 depressurization completed. 14-266 Controlled Blowdown 07/24/2014 12:45:00 am 12:50:00 am 5 min No No Yes BP1\BAKERWF Determination Cause -RC 1803 depressured for water wash and seal oil pump repair. Action Taken 1803 T/C depressurization completed. 14-266 Controlled Blowdown 07/24/2014 3:05:00 am 3:10:00 am 5 min No No Yes BP1\BAKERWF Determination Cause T\C 1803 spin cooling complete. Action Taken 1803 T/C depressurization completed. 14-266 Controlled Slowdown 07/24/2014 10:11:00 pm 10:26:00 pm 15 min No No Yes BP1\BAKERWF Determination Cause let Blowdown of 60" residue gas line for leak testing. Entered into meter 477 Action Taken Depressurization completed. 14-266 Controlled Blowdown 07/24/2014 10.42:00 pm 10:47:00 pm 5 min No No Yes BP1\BAKERWF Determination Cause -RC 1878 depressured after pressuring up to blow liquids out of scrubbers. Blow down section of the low stage scrubber. Action Taken 1878 TIC depressurization completed. 14-266 Controlled Blowdown 07/24/2014 10:52:00 pm 11:35:00 pm 43 min No No Yes BP1\BAKERWF Determination Cause 2nd Blowdown of 60" residue gas line for leak testing. Entered into meter 477 Action Taken Depressurization completed. 14-269 Controlled Blowdown 07/25/2014 1:00:00 am 1:05:00 am 5 min No No Yes BPI\BAKERWF Determination Cause -RC 1878 depressured after pressuring up to blow liquids out of scrubbers. Only Blow down partial off low stage scrubber. Action Taken 1878 T/C depressurization completed. 14-269 Controlled Blowdown 07/25/2014 1:35:00 am 1:40:00 am 5 min No No Yes BP1\BAKERWF Determination Cause TC 1878 depressured after pressuring up to blow liquids out of scrubbers. Second time. Action Taken 1878 T/C depressurization completed. 14-269 Controlled Blowdown 07/25/2014 4:45:00 am 4:50:00 am 5 min No No Yes BP1\BAKERWF Determination Cause T\C 1808 depressured. Unit already shutdown. Unit pressured up by operator. Action Taken 1808 TIC depressurization completed. 135 14 885 30 2537 30 109 8 14-276 Controlled Blowdown 07/29/2014 4:0700 am 4:12:00 am 5 min No No Yes BP1\BAKERWF e Determination Cause T/C 1803 vented down after purge. Waiting for water wash. Action Taken 1803 TIC depressurization completed. Total Volume (MSCF) 15994 Generated 08/04/2014 11:24:17AM Page 2 of 11 Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Sunday, July 20, 2014 11:04 AM To: AK, OPS PCC EOC TL; Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; Hauger, Wayne A; AK, OPS CCP CGF OSM; AK, OPS CCP OTL; AK, HSSEE Env Adv Central; AK, OPS CGF OTL Subject: Gas flaring events at CGF andOW To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC jennifer.huntCa).alaska.gov dave.roby(aalaska.gov victoria ferguson(a.alaska.gov From: Kellie Okonek, GPB Production Optimization Team Leader CGF A flaring event occurred at CGF starting at 07/14/2014 14:15 and stopping at 07/14/2014 16:25 with a volume of 10060 (MSCF). The event lasted for 130 minutes. The event had a volume greater than 5000 (MSCF), and was due to MI compressor 1855 shutdwon due to a valve being out of position. Flaring stopped when the malfunction was repaired. A flaring event occurred at CGF starting at 07/16/2014 17:30 and stopping at 07/17/2014 with a volume of 289 (MSCF). The event was a black smoke event. The event lasted for 390 minutes, and was due to facility shutdown for planned turnaround. A flaring event occurred at CGF starting at 07/17/2014 00:01 and stopping at 07/17/2014 19:35 with a volume of 871 (MSCF). The event lasted for 1174 minutes, and was due to facility shutdown for planned turnaround. This event was related to shutting down the stabilizers as part of the plant -wide shutdown activities. A flaring event occurred at CGF starting at 07/17/2014 00:01 and stopping at 07/17/2014 23:59 with a volume of 10890 (MSCF). The event was a black smoke event. The event lasted for 1438 minutes. The event had a volume greater than 5000 (MSCF), and was due to facility shutdown for planned turnaround. This event was related to shutting down the LTS 1/2/3 as well as the MI distribution system as part of the plant -wide shutdown activities. A flaring event occurred at CGF starting at 07/18/2014 00:01 and stopping at 07/18/2014 18:30 with a volume of 26210 (MSCF). The event lasted for 1109 minutes. The event had a volume greater than 5000 (MSCF), and was due to facility shutdown for planned turnaround. This event was related to depressuring in -plant equipment/piping as part of the plant - wide shutdown activities. A flaring event occurred at CGF starting at 07/18/2014 07:15 and stopping at 07/18/2014 12:07 with a volume of 21 (MSCF). The event lasted for 292 minutes, and was due to facility shutdown for planned turnaround. This event was related to blowing down the WOA 60" gas transit line as part of the plant -wide shutdown activities. CCP Aflaring event occurred at CCP starting at 07/18/2014 07:15 and stopping at 07/18/2014 12:07 with a volume of 10000 (MSCF). The event lasted for 292 minutes. The event had a volume greater than 5000 (MSCF), and was due to CGF shutdown for planned turnaround. This event was related to blowing down the WOA 60" gas transit line as part of the plant -wide shutdown activities (CCP assisted CGF with flaring). Please let me know if you have any questions. Kellie Okonek (alt. Travis Rybicki) PCC/EOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akoosocceoctl aObo.com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCP/FFGU 3. Field PBU - EOA 4. Operator BP 5. Monthfyear of Disposition August -2014 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume, 6. Sold 445,234 Pool Name Pool Code Percent 7. Reinjected 123,848,686 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 2,728 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 34,415 11. Assist Gas 0 12. Fuel gas used in lease operations. 5,237,838 13. Other (see instructions) 64,854 Official Use Only Authorization >i hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6.12) 129,633,755 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: CGF & FS1 129,633,755 18. Transferred to: (Express as a negative #) 0 Commissioner Date 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 0 rrl Block 18: Fuel Gas to LPC = 64,854 mscf I hereby certify that th foregoigg is We and correct to the best of my knowledge. Note: Att volumes must be corrected Signature Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psia and t0 a l temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Dat"/ ` 4 AAC25.235. Form 10422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCPIFFGU 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition September -2014 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 488,688 Pool Name Pool Code Percent 7. Reinjected 187,011,109 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 1,724 9. Flared or vented more than 1 hour (see inslr.) 0 10. Pilot and Purge 33,358 11. Assist Gas 0 12. Fuel gas used in lease operations. 5,352,476 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 192,887,355 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: CGF & FS1 192,887,355 18. Transferred to: (Express as a negative #) 0 Commissioner Date 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar; Block 12: Includes COTP Non-PBU Fuel Gas = 0 mscf; Block 18: Fuel Gas to LPC = 0 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. /�jf%p Signature '"�' "� 6VA Title Manager Production Taxes and Royalties Alaska Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235. r/1 Printed Name Diane Colley Phone (907) 564-5775 Date I" 1 Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION FRECEIVED NOV 18 2014 AOGCC 1. Facility Number 0290000000 2. Facility Name PBU CCPIFFGU 3. Field PBU - EOA 4. Operator BP 5. MonthlYear of Disposition I October -2014 Disposition Volume MCF 20. Forproducfion from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 580,479 Pool Name Pool Code Percent 7. Reinjected 200,413,168 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 3,622 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 34,774 11. Assist Gas 0 12. Fuel gas used in lease operations. 5,637,023 13. Other (see instructions) 84,829 Official Use Only Authorization >t hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 206,753,895 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas D Waste: MCF 17. Transferred from: CGF & FS1 206,753,895 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar, Block 12: Includes COTP Non-PBU Fuel Gas = 0 mscf; Block 18: Fuel Gas to LPC = 84,829 mscf I hereby certify thatpe foregoing is true and correct to the best of my knowledge. VLVVNote: All volumes must be corrected Signature 444444.����ddffffff Ww�f uu,, /� Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psis and t0 a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate RECEIVED STATE OF ALASKA DEC 16 2014 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCPIFFGU 3. Field PBU - EOA 4. Operator I BP 5. Month/Year of Disposition November -2014 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 787,785 Pool Name Pool Code Percent 7. Reinjected 208,312,897 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 3,557 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 33,653 11. Assist Gas 0 12. Fuel gas used in lease operations. 5,986,433 13. Other (see instructions) 85 Official Use On b Authorization >i hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6.12) 215,124,410 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas U Waste: MCF 17. Transferred from: CGF & FS1 215,124,410 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 0 mscf; Block 18: Fuel Gas to LPC = 85 mscf I hereby certify that t e foregoing is ,rue and correct to the best of my knowledge. Note: All volumes must be corrected Signature I Title Mana er Production Taxes and Ro alties Alaska to pressure of 14.65 psia and to a 0/ /� /� temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date AAC25.235. Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate woo q ilooaoo s oje OLET-ZSE (L06) :IIaJ ZLbb-6S9 (L06) :ao!JIO ql uo)lez!w!ldO uo!pnpoJd X03/OJd Jau01O a!Ila)I J01'Jaau!8u3 uo!leziw!ldO pla!j gd9 ue40-aMpanl A!Janag •suo!lsanb Aue aneq noAjl mowl aw lal aseald •aoeld sl! ui ao!nJas of pawnlaJ sem 5581 J/1 uagm paddols 8uuelj •aoueualulew pauueld Jol umopings b58T 0/10l anp sem pue'sainulw OZ Jot palsel Juana aql '(jDSA) SZE jo awnlon a ql!m OZ:bI bIOZ/6Z/1I le 8u!ddols pue 0017T VIOZ/6Z/1I le gu!laels jg0le paJJn000 JUana BUIJelb V •aoeld sll ul pa:pels sem bSSI J/1 uagm paddols Su!Jelj uo(lounjlew luawdmba of anp umopings SSST 7/i of anp sem pue'sainu!w qET Jo; palsel Juana aql '(jOSW) 9SZZZ10 awnlon a ql!m OE:b bTOZ/SZ/TT le 8u!ddols pue 9I:Z bTOZ/8Z/TT le 8ulliels jqD le palm»o Juana SUIJell V aoueualulew pauueld Jol uo!lezunssaJdep Z JS L (0/1) JossaJdwoO/aulgJnl of anp sem pue 'salnulw 5 Jol palsel Juana eql (dOSW) 6 Jo awnlon a gllm 9Z:E 17 WZ/6Z4l le 6ulddols pue OZ:C t7WZ/6M L le 6u!liels dOO le paJJn000 Juana 6uueg V aoueuelwew peuueld Jol uollezunssaidep pue umopings Z JSJ jossaJdwoO/eulgml of anp sem pue 'salnulw 9 Jol p91se1 Juana agl '(dOSW) 99 J to awnlon a gum LVKOZ/6Z/l l le 6wddols pue ZV J q JOZ/6Z/ J J le 6wuels dOO Je pann000 Juana 6uueg V Nsele uosn Jal euololn 'uosn6Jad euoJoln Japea-1 weal uollezlwlldO uollonpoJd gdE)'NauoNo allla>l Jol uego-aslpanq AIJanag :wwd no eMsele goranep 00 OOOOV 'Agog aneO 00 j9D pue dD:) Je sluana 6uuelj seg 110 j9D SdO'W'llO dDD SdO')IV'WSO jOD d» SdO ')IV'M P1Ae0 'sggolS'll D03 DDd SdO')IV'lse3 APV AU3 33SSH ')IV'tio6aJ9'Jngi,V 'V Aieg 'uosuag'eJpuefalV 'ouelseD '(VOO) S pineO 'Agob ((yO(i)1 euolo!A'ddaol (VOO) l Jalluuaf'lunH NV 80:6 bTOZ 'TO Jagwaoa0 'Aepuov4 <wordgmu j6u3ldOpadleJluaDgd9S3'd)IV> J6u3 Jd0 PoJd leJluaD 9d9 SR ')IV A05—e A0b e:lsele lung Ja{luua. OOJOV OOJOV 'lunH Jaj!uuar :ol :pafgnS :30:) :ol :luas :wojd (voa) l jammer 'junH STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION R C IVEo JAN 1 6 201j AOGCC 1. Facility Number 0290000000 2. Facility Name 1 PBU CCP/FFGU 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition December -2014 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 1,014,903 Pool Name Pool Code Percent 7. Reinjected 218,282,634 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 613 9. Flared or vented more than 1 hour (see insh.) 0 10. Pilot and Purge 34,769 11. Assist Gas 0 12. Fuel gas used in lease operations. 6,175,632 13. Other (see instructions) 216 Official Use Only Authorization >1 hr Safety MCF 14. TOTAL VOLUME (ITEMS 6.12) 225,508,767 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: CGF & FS1 225,508,767 18. Transferred to: (Express as a negative #) 0 Commissioner Date 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 0 mscf; Block 18: Fuel Gas to LPC = 216 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. I /Q�//%%%jJJ/�� Note: All volumes must be corrected Signature_ `i=Q�.ff�� Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psia and to a r/14temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date AAC25.235. Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate