Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutPBU CCP/FFCU Gas DispositionState of Alaska AOGCC
Gas Disposition Files
Year: 2014
Facility: PBU CCP/FFGU
Operator: BP EXPLORATION (ALASKA)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000000
2. Facility Name
PBU CCPIFFGU
3. Field
PBU - EOA
4. Operator
BP
5. Month/year of Disposition
I January -2014
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
1,396,030
Pool Name Pool Code Percent
7. Reinjected
223,620,017
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
155
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
35,482
11. Assist Gas
0
12. Fuel gas used in lease operations.
6,378,927
13. Other (see instructions)
10
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
231,430,621
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF & FS1
231,430,621
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Nolthstar; Block 12: Includes COTP Non-PBU Fuel Gas = 1,835 mscf; Block 18:
Fuel Gas to LPC = 10 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
AA
Signature Title Manager Production Taxes and Royalties Alaska
Note: All volumes must be corrected
to pressure of 14.65 psla and t0 a
temperature of 60o F. Authority 20
AAC25.235.
Z
Printed Name Diane COII Phone (907) 564-5775 Date J b
Form 10422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000000
2. Facility Name
PBU CCP/FFGU
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
February -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
1,286,624
Pool Name Pool Code Percent
7. Reinjected
195,586,576
PRUDHOE 640150 100.00
8. Flared or vented 1 hour or less
4,178
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
30,669
11. Assist Gas
0
12. Fuel gas used in lease operations.
5,900,691
13. Other (see instructions)
1,156
Official Use Only
Authorization >l hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
202,809,894
Lease Use
MCF
15. NGL Gas Equivalent
Q
Conservation
MCF
16. Purchased gas
Q
Wase
MCF
17. Transferred from: CGF & Est
202,809,894
18. Transferred to: (Express as a negative #)
Q
Commissioner Date
19. Remarks. Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar, Block 12: Includes COTP Non-PBU Fuel Gas = 2,357 mscf; Block 18:
Fuel Gas to LPC = 1,156 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
)f gy)e Note: All volumes must be corrected
Signature rf K. ,(((� Title Mana er Production Taxes and Ro Ities Alaska to pressure Of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date / 1 AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
February 2014
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <=1 hr Not required for unplanned events <= 1 hr
TOTAL 0
Unplanned Events greater than 1 hour
DATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
2/2/2014
2/2/2014
2/8/2014
2/8/2014
2/8/2014
2/9/2014
2/17/2014
2/21/2014
2/22/2014
2/22/2014
2/22/2014
2/22/2014
2/22/2014
2/22/2014
2/22/2014
2/22/2014
2/22/2014
2/23/2014
2/23/2014
2/23/2014
2/23/2014
2/23/2014
2/24/2014
1340-1345
1415-1420
0230-0330
0720-0730
1015-1040
1425-1450
1708-0738
0617-0649
0020-0025
0310-0315
1247-1252
1325-1330
1353-1358
2030-2035
2125-2130
2214-2219
2347-2352
0157-0202
0434-0439
0653-0658
2118-2123
2320-2325
0103-0108
45 See attachments
8
304
23
28
518
230
325
156
11
135
45
45
77
80
156
156
11
135
14
77
156
11
See attachments
Page 1
3/12/2014
4:56 PM
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
February 2014
2/24/2014
1639-1644
156
2/24/2014
1707-1712
45
2/24/2014
1743-1748
14
2/26/2014
1154-1159
156
2/27/2014
0149-0154
11
2/27/2014
2138-2143
77
2/28/2014
0026-0031
408
2/28/2014
0114-0119
152
2/28/2014
0458-0503
152
2/28/2014
0758-0803
152
2/28/2014
1916-1921
109
TOTAL
4,178
See attachments
TOTAL 0
See attachments
Page 2
3/12/2014
4:56 PM
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events> 1 Hour
0
Planned Events< l hour and not
4,178
exceeding 5,000 MCF
Planned Events> 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
30,669
Assist
0
TOTAL FLARED VOLUME
34,847
See attachments
Page 2
3/12/2014
4:56 PM
Flare Start Date 02/01/2014
Flare End Date 02/28/2014
CCP Flare Report
Total Volume (MSCF) 4178
Report
Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
14-15 Controlled Blowdown 02/02/2014 1:40:00 pm 1:45:00 pm 5 min No No Yes BP1\RUIZSO 45
Determination Cause T\C 1801 pressure tested then depressured forstart up.
Action Taken 1801 T/C depressurized and shut down.
14-15 Controlled Slowdown 02/02/2014 2:15:00 pm 2:20:00 pm 5 min No No Yes BP1 V2UIZS0 8
Determination Cause 'RC 1801 depressured from crank pressure to 50 prig.
Action Taken 1810 T/C depressurization completed.
14-41 Controlled Blowdown 02/08/2014 2:30:00 am 3:30:00 am
60 min
No
No
Yes
Determination Cause FFGU isolated and depressured to HP flare via
P17 -AV.
No
BPI\MANGMM—�
28
Action Taken FFGU depressurization complete.
14-58 Controlled Blowdown 02/22/2014 12:47:00 pm 12:52:00 pm 5 min No
No
BP1\RUIZSO
1441 Controlled Blowdown 02/08/2014 7:20:00 am 7:30:00 am
10 min
No
No
Yes
Determination Cause Vented FFGU to HP flare via P17 -AV.
Action Taken FFGU depressurization complete.
14-41 Controlled Blowdown 02/08/2014 10:15:00 am 10:40:00 am
25 min
No
No
Yes
Determination Cause Vented FFGU to HP flare via P17 -AV.
Action Taken FFGU depressurization complete.
14-43 Controlled Blowdown 02/09/2014 2:25:00 pm 2:50:00 pm 25 min No No Yes
Determination Cause Opened P37 -IC valve to HP Flare to maintain Flare pilots after depressuring FFGU nitrogen purge.
Action Taken P37 -IC valve closed and flaring has stopped.
BPI\MANGMM
304
Determination Cause T\C 1809 shutdown for planned maintenance
BPI\MANGMM
23
14-58 Controlled Blowdown 02/22/2014 3:10:00 am 3:15:00 am 5 min No
No
BPI\MANGMM—�
28
Action Taken 1809 T/C depressurized and shut down.
14-58 Controlled Blowdown 02/22/2014 12:47:00 pm 12:52:00 pm 5 min No
No
BP1\RUIZSO
518
14-50 Controlled Blowdown 02/17/2014 5:08:00 pm 5:38:00 pm 30 min No No Yes BPI\MANGMM
Determination Cause Opened P37 -AV to provide sufficient gas to the HP flare to keep it lit while blowing down nitrogen thru P17 -AV in FFGU.
Action Taken Flaring complete
230
14-57 Controlled Blowdown 02/21/2014 6:17:00 am 6:49:OOam 32min No No Yes BP1\TOWNER 325
Determination Cause P37 -AV Operation Flare valve opened to prevent HP flare from being extinguished while depressunng FFGU with nitrogen. P37 -AV flaring is
captured on meter 405.
Action Taken FFGU depressured to zero PSI and P37 -AV was dosed.
14-58 Controlled Blowdown 02/22/2014 12:20:00 am 12:25:00 am 5 min No
No
Determination Cause T\C 1809 shutdown for planned maintenance
Action Taken 1809 T/C depressurized and shut down.
14-58 Controlled Blowdown 02/22/2014 3:10:00 am 3:15:00 am 5 min No
No
Determination Cause T\C 1809 spin cooling
Action Taken 1809 T/C depressurized and shut down.
14-58 Controlled Blowdown 02/22/2014 12:47:00 pm 12:52:00 pm 5 min No
No
Determination Cause 1807 TIC shutdown for SILOPA/check valve testing. Normal stop.
Action Taken 1807 TIC stopped depressuring at 50 PSI.
14-58 Controlled Blowdown 02/22/2014 1:25:00 pm 1:30:00 pm 5 min No
No
Determination Cause 1807 T/C vented down from 227 PSI to 50 PSI after compressor check valve leak test.
Yes BP1\KOSMBO 156
Yes BP1\KOSMBO 11
Yes BP7\TOWNER
Yes BP1\TOWNER
135
45
Generated 03/04/2014 2:16:08PM Page 1 of 9
Flare StartDate 02/01/2014
Flare End Date 02/28/2014
Action Taken 1807 TIC venting stopped at 50 PSI.
14-58 Controlled Slowdown 02122/2014 1:53:00 pm 1:58:00 pm 5 min No No
Determination Cause 1807 T/C vented down from 490 PSI to 50 PSI after compressor check valve leak test.
Action Taken 1807 TIC venting stopped at 50 PSI.
14-58 Controlled Slowdown 02/22/2014 8:30:00 pm 8:35:00 pm
5 min
No
No
Determination Cause T\C 1809 pressure test for PSV work
14-60 Comrolled Blowdown 02/24/2014 4:39:00 pm 4:44:00 pm 5 min No No
14-59 Controlled Blowdown 02/23/2014 4:34:00 am 4:39:00 am
5 min No
Action Taken 1809 TIC depressurization completed.
1812 TIC depressured to 50 PSI and stopped venting.
Action Taken 1802 T/C depressurized and shut down.
Determination Cause
14-58 Controlled Blowdown 02/22/2014 9:25:00 pm 9:30:00 pm
5 min
No
No
Determination Cause T\C 1809 shutdown duetoa 90 Sec seal oil diff trip
14-59 Controlled Blowdown 02/23/2014 9:18:00 pm 9:23:00 pm
5 min No
Action Taken 1809 depressurized and shut down.
Action Taken 1810 T/C depressurization completed.
14-58 Controlled Slowdown 02/22/2014 10:14:00 pm 10:19:00 pm
5 min
No
No
Determination Cause T\C 1809 shutdown due to valve out of position on startup
Action Taken 1809 T/C depressurization completed.
14-58 Controlled Blowdown 02/22/2014 11:47:00 pm 11:52:00 pm
5 min
No
No
Determination Cause T\C 1810 shutdown for planned maintenance sit lops
Action Taken 1810 T/C depressurized and shut down.
14-59 Controlled Blowdown 02/23/2014 1:57:00 am 2:02:00 am
5 min No
Determination Cause -RC 1810 spin cooling
Action Taken
Action Taken 1810 T/C depressurized and shut down.
14-60 Comrolled Blowdown 02/24/2014 4:39:00 pm 4:44:00 pm 5 min No No
14-59 Controlled Blowdown 02/23/2014 4:34:00 am 4:39:00 am
5 min No
Determination Cause T\C 1802 shutdown for planned maintenance
1812 TIC depressured to 50 PSI and stopped venting.
Action Taken 1802 T/C depressurized and shut down.
Determination Cause
14-59 Controlletl Blowdown 02/23/2014 6:53:00 am 6:58:00 am
5 min No
Determination Cause 1802 TIC spin cooling completed. ESD stop given.
Action Taken 1802 T/C depressured to zero PSI.
14-59 Controlled Blowdown 02/23/2014 9:18:00 pm 9:23:00 pm
5 min No
Determination Cause T/C 1810 pressured up for PSV leak test
Action Taken 1810 T/C depressurization completed.
14-59 Controlled Blowdown 02/23/2014 11:20:00 pm 11:25:00 pm
5 min No
Determination Cause M 1810 shutdown for #2 bearing lube oil leak
Action Taken 1810 T/C depressurized and shut down.
No
No
No
No
Yes BP1\TOWNER 45
Yes BP1\KOSMBO 77
Yes BP1\KOSMBO 80
Yes BP1\KOSMBO 156
Yes BP1\KOSMBO 156
Yes BP1\KOSMBO 11
Yes BP1\KOSMBO 135
Yes BP1\TOWNER 14
Yes BP1\KOSMBO 77
No Yes BP1\KOSMBO 156
14-60 Controlled Blowdown 02/24/2014 1:03:00 am 1:08:00 am 5 min No No
Determination Cause
-RC 1810 spin Cooling
Action Taken
1810 T/C depressurized and shut down.
14-60 Comrolled Blowdown 02/24/2014 4:39:00 pm 4:44:00 pm 5 min No No
Determination Cause
1812 TIC shutdmn for SIL/LOPA testing. Depressured to 50 PSI.
Action Taken
1812 TIC depressured to 50 PSI and stopped venting.
1460 Controlled Blowdown 02/24/2014 5:07:00 pm 5:12:00 pm 5 min No No
Determination Cause
1802 T/C pressure tested up 300 PSI then depressure to 50 PSI for leak testing.
Action Taken
1802 T/C stopped venting at 50 PSI.
I 14-60 Controlled Blowdown 02/24/2014 5:43:00 pm 5:48:00 pm 5 min No No
Generated 03/04/2014 2:15:08PM
Yes BP1\KOSMBO 11
Yes BP1\TOWNER 156
Yes BPI\TOWNER 45
Yes BP1\KOSM80 14
Page 2 of 9
Flare Start Date 02/01/2014
Flare End Date 02/28/2014
Determination Cause -RC 1802 shutdown because it wouldn't go past crank
Action Taken 1802 TIC depressurized and shut down.
14-61 Controlled Blowdown 02/26/2014 11:54:00 pm 11:59:00 pm 5 min No
No
Determination Cause T/C 1811 shut down for SIL/LOPA testing and maintenance. Depressured to 75 psi.
Action Taken T/C 1811 depressurization complete.
14-62 Controlled Blowdown 02/27/2014 149:00 am 1:54:00 am 5 min No
No
Determination Cause T/C 1811 depressure from spin cool too psig.
Action Taken T/C 1811 depressurization complete.
14-62 Controlled Blowdown 02/27/2014 9:38:00 pm 9:43:00 pm 5 min No
No
Determination Cause Pressure tested T/C 1811. Depressured from full suction pressure to 64 psi.
Action Taken T/C 1811 depressurization complete.
14-64 Controlled Blowdown 02/28/2014 12:26:00 am 12:31:00 am 5 min No
No
Determination Cause T/C 1878 shut down for SIL/LOPA testing and maintenance.
Action Taken TIC 1878 depressurization complete.
14-64 Controlled Blowdown 02/28/2014 1:14:00 am 1:19:00 am 5 min No
No
Determination Cause 1878 TIC depressured from 177 PSI Were PSI.
Action Taken 1878 T/C stopped depressuring at zero PSL
14-64 Controlled Blowdown 02/28/2014 4:58:00 am 5:03:00 am 5 min No
No
Determination Cause T/C 1878 spin cool ESD'd for low level in seal oil overhead tank.
Action Taken T/C 1878 depressurization complete.
14-64 Controlled Blowdown 02/28/2014 7:58:00 am 8:03:00 am 5min No
No
Determination Cause 1878 TIC shutdown after spin cooling. Depressured to zero PSI.
Action Taken 1878 T/C venting stopped at zero PSI.
14-64 Controlled Blowdown 02/28/2014 7:16:00 pm 7:21:00 pm 5 min No
No
Determination Cause T/C 1878 depressured for water wash.
Action Taken TIC 1878 depressunzation complete. -
Generated 03/04/2014 2:15:08PM
Yes BPI\GAMBHO 156
Yes BPI\GAMBHO 11
Yes BPI\GAMBHO 77
Yes BP1\GAMBHO 408
Yes BP1\TOWNER 152
-Yes BP1\GAMBHO-- - 152
Yes BP1\TOWNER 152
Yes BPi\GAMBHO 109
Total volume (MSCF) 4178
Page 3 of 9
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent: Tuesday, February 18, 2014 9:56 AM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, HSSEE Env Adv West; Burgess, David H; Hauger, Wayne A; AK, OPS
CCP CGF OSM; AK, OPS CCP OTL; AK, OPS FS2 Facility OTL; AK, OPS FS2 OSM; AK,
OPS FS1 OSM; AK, OPS FS1 Facility OTL; AK, HSSEE Env Adv Central; AK, HSSEE Env
Adv East; AK, OPS PCC EOC TL
Subject: Gas flaring events at FS2, FS1, CCP
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
iennifer hunt(a)alaska.00v dave.robvCa).alaska.gov victoria.ferousonCZDalaska.gov
From: Kellie Okonek, GPB Production Optimization Team Leader
A flaring event occurred at FS2 starting at 02/04/2014 10:30 and stopping at 02/04/2014 13:30 with a volume of 172
(MSCF). The event lasted for 180 minutes and was due to blowdown of 16D commonline for planned maintenance.
A flaring event occurred at CCP starting at 02/08/2014 02:30 and stopping at 02/08/2014 06:30 with a volume of 304
(MSCF). The event lasted for 60 minutes and was due to FFGU depressurization when supply was switched back to CGF
FFG.
A flaring event occurred at FS1 starting at 02/09/2014 16:20 and stopping at 02/09/2014 16:35 with a volume of 5573
(MSCF). The event had a volume greater than 5000 (MSCF) and was due to LPS compressors shutdown due to supply
unit failure. Flaring stopped when the power supply was replaced and the compressors were loaded.
Please let me know if you have any questions.
Kellie Okonek (alt. Travis Rybicki)
PCC/EOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 382 1370 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akopsi)cceoctl@bp.com
M
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000000
2. Facility Name
PBU CCP/FFGU
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
March -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
1,386,827
Pool Name Pool Code Percent
7. Reinjected
218,224,905
PRUDHOE 640150 100.00%
8. Flared or vented l hour or less
1,595
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
34,988
11. Assist Gas
U
12. Fuel gas used in lease operations.
6,089,597
13. Other (see instructions)
29
Official Use Only
Authorization >i hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
225,737,941
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from: CGF & FS1
225,737,941
Commissioner Date
18. Transferred to: (Express as a negative #)
O
19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar; Block 12: Includes COTP Non-PBU Fuel Gas = 6,362 mscf; Block 18:
Fuel Gas to LPC = 29 mscf
I hereby certify that,t thhe��� foregoing is true and correct to the best of my knowledge.
/,t ^ - I Note: All volumes must be corrected
Signature /` —��wt l �`^^�-OY1. Title Mana er Production Taxes and Ro allies Alaska to pressure of 14.65 psis and to a
(,�, temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date ` AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000000
2. Facility Name
PBU CCPIFFGU
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
Aril -2014
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
1,034,402
Pool Name Pool Code Percent
7. Reinjected
205,983,765
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
946
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
32,134
11. Assist Gas
0
12. Fuel gas used in lease operations.
6,001,319
13. Other (see instructions)
12,497
Official Use Only
Authorization >t hr
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
213,065,063
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF 8 FS1
213,065,063
18. Transferred to: (Express as a negative #)
0
Commissioner Date
19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar; Block 12: Includes COTP Non-PBU Fuel Gas = 7,032 mscf; Block 18:
Fuel Gas to LPC = 12,497 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
& , /t ,171D��
Signature //�( I ,(/�/ Tiee Mana er Production Taxes and Ro alties Alaska
Note: All volumes must be corrected
to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
AAC25.235.
Printed Name Diane Colley Phone (907) 564-5775 Date /
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000000
12`UName
PBU CCPIFFGU
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
I May -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total volume.
6. Sold
478,825
Pool Name Pool Code Percent
7. Reinjected
186,174,929
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
3,037
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
34,420
11. Assist Gas
O
12. Fuel gas used in lease operations.
5,731,666
13. Other (see instructions)
9
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
192,422,886
Lease Use
MCF
15. NGL Gas Equivalent
O
Conservation
MCF
16. Purchased gas
O
Waste:
MCF
17. Transferred from: CGF 8 FSI
192,422,886
18. Transferred to: (Express as a negative #)
0
Commissioner Date
19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar; Block 12: Includes COTP Non-PBU Fuel Gas = 4,988 mscf; Block 18:
Fuel Gas to LPC = 9 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
/J/j/f)
Signature w1 �C, Title Manager Production Taxes and Ro alties Alaska
Note: All volumes must be corrected
to pressure Of 14.65 psis and to a
temperature of 60o F. Authority 20
AAC25.235.
l %� /
Printed Name Diane ColleyPhone (907) 564-5775 Date (O
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number2.
0290000000
Facility Name
PBU CCP/FFGU
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
I June -2014
Disposition
Volume MCF
20. For production /mm multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
443,796
Pool Name Pool Code Percent
7. Reinjected
186,508,390
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
1,409
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
33,270
11. Assist Gas
0
12. Fuel gas used in lease operations.
5,591,438
13. Other (see instructions)
60,191
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
192,638,494
Lease Use
MCF
15, NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
U
Waste:
MCF
17. Transferred from: CGF & FS1
192,638,494
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar; Block 12: Includes COTP Non-PBU Fuel Gas = 1,005 mscf; Block 18:
Fuel Gas to LPC = 60,191 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
/,1•,/,//�,,/t/,r'' Note: All volumes must be corrected
Signature (.'Ld��-//GI Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and t0 a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date I AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000000
2. Facility Name
PBU CCP/FFGU
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
July -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
449,758
Pool Name Pool Code Percent
7. Reinjected
126,755,130
PRUDHOE 640150 100.00%
8. Flared or vented l hour or less
5,994
9. Flared or vented more than 1 hour (see instr.)
10,000
10. Pilot and Purge
34,377
11. Assist Gas
0
12. Fuel gas used in lease operations.
5,144,437
13. Other (see instructions)
6
Official Use Only
Authorization >7 hr
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
132, 399,696
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF & FSI
132,399,696
41
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar; Block 12: Includes COTP Non-PBU Fuel Gas = 0 mscf; Block 18: Fuel
Gas to LPC = 0 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
irM�� Note: All volumes must be corrected
Signature el LY (.66�/ Title Manager Production Taxes an Ro pities Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
✓Z -F-
4/ qjt#-
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
DATE
WIP
TOTAL 0
TOTAL 0
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
July 2014
Not required for unplanned events <= 1 hr
DESCRIPTION OF INCIDENT &
See attachments
Not required for unplanned events <=1 hr
See attachments
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT&CAUSE ACTION TAKENTO ELIMINATE CAUSE
7/10/2014
2023-2025
135 See attachments See attachments
7/11/2014
1505-1510
8
7/12/2014
1145-1150
408
7/18/2014
0650-0655
420
7/21/2014
0834-0839
156
7/22/2014
0205-0210
135
7/22/2014
0435-0440
8
7/22/2014
1120-1125
156
7/22/2014
1332-1337
11
7/23/2014
0122-0127
135
7/23/2014
0359-0404
14
7/23/2014
0802-0807
408
7/23/2014
1100-1105
109
7/23/2014
1210-1215
135
7/24/2014
0045-0050
135
7/24/2014
0305-0310
14
7/24/2014
2211-2226
885
7/24/2014
2242-2247
30
7/24/2014
2252-2335
2,537
7/25/2014
0100-0105
30
7/25/2014
0135-0140
109
7/25/2014
0445-0450
8
7/29/2014
0407-0412
8
TOTAL
5,994
Page 1
8/14/2014
2:23 PM
7/18/2014 0715-1207
TOTAL
Unplanned Events <1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- CENTRAL COMPRESSOR PLANT
GAS FLARING INCIDENT REPORT
July 2014
10,000 See attachments
10,000
TOTAL
0
0
5,994
10,000
34,377
0
50,371
See attachments
Page 2
8/14/2014
2:23 PM
Flan: Start Date 07101/2014
Flare End Date 07/31/2014
CCP Flare Report
Total Volume (MSCF) 15994
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
14-238 Controlled Blowdown 07/10/2014 8:23:00 pm 8:28.00 pm 5 min No
No Yes
Determination Cause
T/C 1805 OSD tripped on F95 -AV valve out of position.
BPI\TOWNER
Action Taken
T/C 1805 stopped flaring when it depressured down to 50 PSI.
No
14-239 Controlled Blowdown 07/11/2014 3:05:00 pm 3:10:00 pm 5 min No
No Yes
Determination Cause
TC 1805 given a stop after water wash complete.
Determination Cause TC 1810 depressured for water wash
Action Taken
1805 T/C depressurization completed.
14-242 Controlled Blowdown 07/12/2014 11:45:00 am 11:50:00 am 5 min No
No Yes
Determination Cause
TC 1876 shutdown to change out computer. Unit was unloaded and no impact.
Action Taken
1876 T/C depressurization completed.
No
No
Yes
BP1\BRAUJW
14-254 Controlled Slowdown 07/18/2014 6:50:00 am 6:55.00 am 5 min No
No Yes
Determination Cause
TC 1876 shutdown for CGF TAR. Not needed and used to assist in 60" WOA transit line blowdown
Action Taken
T/C 1876 depressurization completed.
14-254 Controlled Blowdown 07/18/2014 7:15:00 am 12:07:00 pm 292 min No
No Yes
Determination Cause
TIC 1876 used to assist CGF with blowing down the 60" WOA transit line
Action Taken
60" WOA transit line depressuring completed using T/C 1876
No
14-261 Controlled Blowdown 07/21/2014 8:34:00 am 83900 am 5 min No
No Yes
Determination Cause
TC 1812 depressured for water wash
Determination Cause 1808 T/C shutdown for walerwash.
Action Taken
T/C 1812 depressurization completed.
14-263 Controlled Blowdown 07/22/2014 2:05:00 am 21000 am 5 min No
No Yes
Determination Cause
TIC 1807 shutdown for water wash.
Action Taken
T/C 1807 depressured down to 50 PSI then stopped.
BP1\TOWNER 135
BP1\BAKERWF 8
BPIOAKERWF 408
BPI\BRAUJW 420
BP1\BRAUJW 10000
BP1\BRAUJW 156
BPI\TOWNER 135
14-263 Controlled Blowdown 07/22/2014 4:35:00 am 44000 am 5 min
Determination Cause TIC 1807 stopped from spin cooling.
Action Taken T/C 1807 depressured down to 50 PSI then stopped.
No
No
Yes
BPI\TOWNER
8
14-263 Controlled Slowdown 07/22/2014 11:20:00 am 11:25:00 am 5 min
No
No
Yes
BP1\BRAUJW
156
Determination Cause TC 1810 depressured for water wash
Action Taken TIC 1810 depressurization completed.
14-263 Controlled Blowdown 07/22/2014 1:32:00 pm 1:37:00 pm 5 min
No
No
Yes
BP1\BRAUJW
11
Determination Cause TC 1810 spin cooling
Action Taken TIC 1810 depressurization completed.
14-264 Controlled Blowdcwn 07/23/2014 1:22:00 am 1:2700 am 5 min
No
No
Yes
BP1\TOWNER
135
Determination Cause 1808 T/C shutdown for walerwash.
Action Taken 1808 T/C depressured down to 50 PSI then stopped.
14-264 Controlled Blowdown 07/23/2014 3:59:00 am 4:04:00 am 5 min
No
No
Yes
SP1\TOWNER
14
Generated 08/04/2014 11:24:17AM Page 1 of 11
Flare Start Date 07/01/2014
Flare End Date 07/31/2014
Determination Cause 1808 T/C shutdown from spin cooling.
Action Taken 1808 TIC depressured to zero PSI and stopped.
14-264 Controlled Blowdown 07/23/2014 8:02:00 am 8:07:00 am 5 min No No Yes BP1\BRAUJW 408
Determination Cause TC 1878 shutdown for planned maintenance
Action Taken T/C 1878 depressurization completed.
14-264 Controlled Blowdown 07/23/2014 11:00:00 am 11:05:00 am 5 min No No Yes BP1\BRAUJW 109
Determination Cause -RC 1878 shut down from spin cooling
Action Taken T/C 1878 depressurization completed.
14-264 Controlled Blowdown 07/23/2014 12:10:00 pm 12:15:00 pm 5 min No No Yes BP1\BRAUJW 135
Determination Cause T\C 1804 depressured for water wash
Action Taken T/C 1804 depressurization completed.
14-266 Controlled Blowdown 07/24/2014 12:45:00 am 12:50:00 am 5 min No
No
Yes
BP1\BAKERWF
Determination Cause -RC 1803 depressured for water wash and seal oil pump repair.
Action Taken 1803 T/C depressurization completed.
14-266 Controlled Blowdown 07/24/2014 3:05:00 am 3:10:00 am 5 min No
No
Yes
BP1\BAKERWF
Determination Cause T\C 1803 spin cooling complete.
Action Taken 1803 T/C depressurization completed.
14-266 Controlled Slowdown 07/24/2014 10:11:00 pm 10:26:00 pm 15 min No
No
Yes
BP1\BAKERWF
Determination Cause let Blowdown of 60" residue gas line for leak testing. Entered into meter 477
Action Taken Depressurization completed.
14-266 Controlled Blowdown 07/24/2014 10.42:00 pm 10:47:00 pm 5 min No
No
Yes
BP1\BAKERWF
Determination Cause -RC 1878 depressured after pressuring up to blow liquids out of scrubbers. Blow down section of the low
stage scrubber.
Action Taken 1878 TIC depressurization completed.
14-266 Controlled Blowdown 07/24/2014 10:52:00 pm 11:35:00 pm 43 min No
No
Yes
BP1\BAKERWF
Determination Cause 2nd Blowdown of 60" residue gas line for leak testing. Entered into meter 477
Action Taken Depressurization completed.
14-269 Controlled Blowdown 07/25/2014 1:00:00 am 1:05:00 am 5 min No No Yes BPI\BAKERWF
Determination Cause -RC 1878 depressured after pressuring up to blow liquids out of scrubbers. Only Blow down partial off low stage scrubber.
Action Taken 1878 T/C depressurization completed.
14-269 Controlled Blowdown 07/25/2014 1:35:00 am 1:40:00 am 5 min No No Yes BP1\BAKERWF
Determination Cause TC 1878 depressured after pressuring up to blow liquids out of scrubbers. Second time.
Action Taken 1878 T/C depressurization completed.
14-269 Controlled Blowdown 07/25/2014 4:45:00 am 4:50:00 am 5 min No No Yes BP1\BAKERWF
Determination Cause T\C 1808 depressured. Unit already shutdown. Unit pressured up by operator.
Action Taken 1808 TIC depressurization completed.
135
14
885
30
2537
30
109
8
14-276 Controlled Blowdown 07/29/2014 4:0700 am 4:12:00 am 5 min No No Yes BP1\BAKERWF e
Determination Cause T/C 1803 vented down after purge. Waiting for water wash.
Action Taken 1803 TIC depressurization completed.
Total Volume (MSCF) 15994
Generated 08/04/2014 11:24:17AM Page 2 of 11
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent: Sunday, July 20, 2014 11:04 AM
To: AK, OPS PCC EOC TL; Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, HSSEE Env Adv West; Hauger, Wayne A; AK, OPS CCP CGF OSM;
AK, OPS CCP OTL; AK, HSSEE Env Adv Central; AK, OPS CGF OTL
Subject: Gas flaring events at CGF andOW
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
jennifer.huntCa).alaska.gov dave.roby(aalaska.gov victoria ferguson(a.alaska.gov
From: Kellie Okonek, GPB Production Optimization Team Leader
CGF
A flaring event occurred at CGF starting at 07/14/2014 14:15 and stopping at 07/14/2014 16:25 with a volume of 10060
(MSCF). The event lasted for 130 minutes. The event had a volume greater than 5000 (MSCF), and was due to MI
compressor 1855 shutdwon due to a valve being out of position. Flaring stopped when the malfunction was repaired.
A flaring event occurred at CGF starting at 07/16/2014 17:30 and stopping at 07/17/2014 with a volume of 289 (MSCF).
The event was a black smoke event. The event lasted for 390 minutes, and was due to facility shutdown for planned
turnaround.
A flaring event occurred at CGF starting at 07/17/2014 00:01 and stopping at 07/17/2014 19:35 with a volume of 871
(MSCF). The event lasted for 1174 minutes, and was due to facility shutdown for planned turnaround. This event was
related to shutting down the stabilizers as part of the plant -wide shutdown activities.
A flaring event occurred at CGF starting at 07/17/2014 00:01 and stopping at 07/17/2014 23:59 with a volume of 10890
(MSCF). The event was a black smoke event. The event lasted for 1438 minutes. The event had a volume greater than
5000 (MSCF), and was due to facility shutdown for planned turnaround. This event was related to shutting down the LTS
1/2/3 as well as the MI distribution system as part of the plant -wide shutdown activities.
A flaring event occurred at CGF starting at 07/18/2014 00:01 and stopping at 07/18/2014 18:30 with a volume of 26210
(MSCF). The event lasted for 1109 minutes. The event had a volume greater than 5000 (MSCF), and was due to facility
shutdown for planned turnaround. This event was related to depressuring in -plant equipment/piping as part of the plant -
wide shutdown activities.
A flaring event occurred at CGF starting at 07/18/2014 07:15 and stopping at 07/18/2014 12:07 with a volume of 21
(MSCF). The event lasted for 292 minutes, and was due to facility shutdown for planned turnaround. This event was
related to blowing down the WOA 60" gas transit line as part of the plant -wide shutdown activities.
CCP
Aflaring event occurred at CCP starting at 07/18/2014 07:15 and stopping at 07/18/2014 12:07 with a volume of 10000
(MSCF). The event lasted for 292 minutes. The event had a volume greater than 5000 (MSCF), and was due to CGF
shutdown for planned turnaround. This event was related to blowing down the WOA 60" gas transit line as part of the
plant -wide shutdown activities (CCP assisted CGF with flaring).
Please let me know if you have any questions.
Kellie Okonek (alt. Travis Rybicki)
PCC/EOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 382 1370 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akoosocceoctl aObo.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000000
2. Facility Name
PBU CCP/FFGU
3. Field
PBU - EOA
4. Operator
BP
5. Monthfyear of Disposition
August -2014
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume,
6. Sold
445,234
Pool Name Pool Code Percent
7. Reinjected
123,848,686
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
2,728
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
34,415
11. Assist Gas
0
12. Fuel gas used in lease operations.
5,237,838
13. Other (see instructions)
64,854
Official Use Only
Authorization >i hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
129,633,755
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF & FS1
129,633,755
18. Transferred to: (Express as a negative #)
0
Commissioner Date
19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 0 rrl Block 18:
Fuel Gas to LPC = 64,854 mscf
I hereby certify that th foregoigg is We and correct to the best of my knowledge.
Note: Att volumes must be corrected
Signature Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psia and t0 a
l temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Dat"/ ` 4 AAC25.235.
Form 10422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000000
2. Facility Name
PBU CCPIFFGU
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
September -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
488,688
Pool Name Pool Code Percent
7. Reinjected
187,011,109
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
1,724
9. Flared or vented more than 1 hour (see inslr.)
0
10. Pilot and Purge
33,358
11. Assist Gas
0
12. Fuel gas used in lease operations.
5,352,476
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
192,887,355
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF & FS1
192,887,355
18. Transferred to: (Express as a negative #)
0
Commissioner Date
19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar; Block 12: Includes COTP Non-PBU Fuel Gas = 0 mscf; Block 18: Fuel
Gas to LPC = 0 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
/�jf%p
Signature '"�' "� 6VA Title Manager Production Taxes and Royalties Alaska
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.
r/1
Printed Name Diane Colley Phone (907) 564-5775 Date I" 1
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
FRECEIVED
NOV 18 2014
AOGCC
1. Facility Number
0290000000
2. Facility Name
PBU CCPIFFGU
3. Field
PBU - EOA
4. Operator
BP
5. MonthlYear of Disposition
I October -2014
Disposition
Volume MCF
20. Forproducfion from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
580,479
Pool Name Pool Code Percent
7. Reinjected
200,413,168
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
3,622
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
34,774
11. Assist Gas
0
12. Fuel gas used in lease operations.
5,637,023
13. Other (see instructions)
84,829
Official Use Only
Authorization >t hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
206,753,895
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
D
Waste:
MCF
17. Transferred from: CGF & FS1
206,753,895
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco and Northstar, Block 12: Includes COTP Non-PBU Fuel Gas = 0 mscf; Block 18: Fuel
Gas to LPC = 84,829 mscf
I hereby certify thatpe foregoing is true and correct to the best of my knowledge.
VLVVNote: All volumes must be corrected
Signature 444444.����ddffffff Ww�f uu,, /� Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psis and t0 a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
RECEIVED
STATE OF ALASKA DEC 16 2014
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000000
2. Facility Name
PBU CCPIFFGU
3. Field
PBU - EOA
4. Operator
I BP
5. Month/Year of Disposition
November -2014
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
787,785
Pool Name Pool Code Percent
7. Reinjected
208,312,897
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
3,557
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
33,653
11. Assist Gas
0
12. Fuel gas used in lease operations.
5,986,433
13. Other (see instructions)
85
Official Use On b
Authorization >i hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
215,124,410
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
U
Waste:
MCF
17. Transferred from: CGF & FS1
215,124,410
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 0 mscf; Block 18:
Fuel Gas to LPC = 85 mscf
I hereby certify that t e foregoing is ,rue and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature I Title Mana er Production Taxes and Ro alties Alaska to pressure of 14.65 psia and to a
0/ /� /� temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
woo q ilooaoo s oje
OLET-ZSE (L06) :IIaJ
ZLbb-6S9 (L06) :ao!JIO
ql uo)lez!w!ldO uo!pnpoJd X03/OJd
Jau01O a!Ila)I
J01'Jaau!8u3 uo!leziw!ldO pla!j gd9
ue40-aMpanl A!Janag
•suo!lsanb Aue aneq noAjl mowl aw lal aseald
•aoeld sl! ui ao!nJas of pawnlaJ sem 5581 J/1 uagm
paddols 8uuelj •aoueualulew pauueld Jol umopings b58T 0/10l anp sem pue'sainulw OZ Jot palsel Juana aql '(jDSA)
SZE jo awnlon a ql!m OZ:bI bIOZ/6Z/1I le 8u!ddols pue 0017T VIOZ/6Z/1I le gu!laels jg0le paJJn000 JUana BUIJelb V
•aoeld sll ul pa:pels sem bSSI J/1 uagm paddols
Su!Jelj uo(lounjlew luawdmba of anp umopings SSST 7/i of anp sem pue'sainu!w qET Jo; palsel Juana aql '(jOSW)
9SZZZ10 awnlon a ql!m OE:b bTOZ/SZ/TT le 8u!ddols pue 9I:Z bTOZ/8Z/TT le 8ulliels jqD le palm»o Juana SUIJell V
aoueualulew
pauueld Jol uo!lezunssaJdep Z JS L (0/1) JossaJdwoO/aulgJnl of anp sem pue 'salnulw 5 Jol palsel Juana eql
(dOSW) 6 Jo awnlon a gllm 9Z:E 17 WZ/6Z4l le 6ulddols pue OZ:C t7WZ/6M L le 6u!liels dOO le paJJn000 Juana 6uueg V
aoueuelwew peuueld
Jol uollezunssaidep pue umopings Z JSJ jossaJdwoO/eulgml of anp sem pue 'salnulw 9 Jol p91se1 Juana agl '(dOSW)
99 J to awnlon a gum LVKOZ/6Z/l l le 6wddols pue ZV J q JOZ/6Z/ J J le 6wuels dOO Je pann000 Juana 6uueg V
Nsele uosn Jal euololn
'uosn6Jad euoJoln
Japea-1 weal uollezlwlldO uollonpoJd gdE)'NauoNo allla>l Jol uego-aslpanq AIJanag :wwd
no eMsele goranep
00 OOOOV 'Agog aneO 00
j9D pue dD:) Je sluana 6uuelj seg
110 j9D SdO'W'llO dDD SdO')IV'WSO jOD d» SdO
')IV'M P1Ae0 'sggolS'll D03 DDd SdO')IV'lse3 APV AU3 33SSH ')IV'tio6aJ9'Jngi,V
'V Aieg 'uosuag'eJpuefalV 'ouelseD '(VOO) S pineO 'Agob ((yO(i)1 euolo!A'ddaol
(VOO) l Jalluuaf'lunH
NV 80:6 bTOZ 'TO Jagwaoa0 'Aepuov4
<wordgmu j6u3ldOpadleJluaDgd9S3'd)IV> J6u3 Jd0 PoJd leJluaD 9d9 SR ')IV
A05—e
A0b e:lsele lung Ja{luua.
OOJOV
OOJOV 'lunH Jaj!uuar :ol
:pafgnS
:30:)
:ol
:luas
:wojd
(voa) l jammer 'junH
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
R C IVEo
JAN 1 6 201j
AOGCC
1. Facility Number
0290000000
2. Facility Name
1 PBU CCP/FFGU
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
December -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
1,014,903
Pool Name Pool Code Percent
7. Reinjected
218,282,634
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
613
9. Flared or vented more than 1 hour (see insh.)
0
10. Pilot and Purge
34,769
11. Assist Gas
0
12. Fuel gas used in lease operations.
6,175,632
13. Other (see instructions)
216
Official Use Only
Authorization >1 hr
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
225,508,767
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from: CGF & FS1
225,508,767
18. Transferred to: (Express as a negative #)
0
Commissioner Date
19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 0 mscf; Block 18:
Fuel Gas to LPC = 216 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
I /Q�//%%%jJJ/�� Note: All volumes must be corrected
Signature_ `i=Q�.ff�� Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psia and to a
r/14temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate