ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000029
2. Facility Name
PBU FS 2
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
January -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00
B. Flared or vented i hour or less
125
9. Flared or vented more than i hour (see instr.)
0
10. Pilot and Purge
14,384
11. Assist Gas
1,286
12. Fuel gas used in lease operations.
780,510
13. Other (see instructions)
0
Official Use Only
Authorization>1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
796,305
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
IT Transferred from: CGF
344,496
Commissioner Date
16. Transferred to: (Express as a negative #) CGF
-16,531,155
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
/�Jq�� ��///y//J ^
Signature /LUI td O6d6=rte 1, Title Manager Production Taxes and Ro allies Alaska
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
I AAC25.235.
Printed Name Diane Colley Phone (907) 564-5775 Dale
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRnnl iCin rec n1QDnQ1-r1f k1
1.
Facility Number 2. Facility Name
0290000029 PBU FS 2
3. Field
PBU EOA
4. Operator 5. Month of Disposition
Disposition
-
Volume MCF
Fear
BP Februa -2014
20. For production from multiple pools, list contribution of each pool as a percent of
6.
Sold
0
Total Volume.
Pool Name Pool Code Percent
7,
Reinjected
0
PRUDHOE 640150 100.00%
&
Flared or vented 1 hour or less
250
9.
Flared or vented more than 1 hour (see instr.)
172
10.
Pilot and Purge
11,737
11.
Assist Gas
0
12.
Fuel gas used in lease operations.
689,805
13.
Other (see instructions)0
Official Use Only
Authorization >1 hr: MCF
14.
TOTAL VOLUME (ITEMS 6-12)
Safety `�Z
701,964
15.
NGL Gas Equivalent
Lease Use MCF
0
16.
Purchased gas
Conservation MCF
0
Waste: MCF
17.
Transferred from: CGF
317,442
16.
Transferred to: (Express as a negative #) CGF
-15,458,073
Commissioner Date
19.
Remarks:
I hereby certify that th, foregoing is true and correct to the best of my knowledge.
Signature / �L/ I
Note: All volumes must be corrected
Title Manager Production Taxes and Re alties Alaska to pressure of 14.65 psis and to a
Printed
Name Diane Colle
temperature of 60o F. Authority 20
Phone (907) 564-5775
Date AAC25.235.
VL -F
613111 -
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
BP EXPLORATION (ALASKA) INC. Page 5
PRUDHOE BAY UNIT- FS -2
GAS FLARING INCIDENT REPORT
February 2014
LUnplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
2/3/2014 0425-0507 125 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
2/5/2014 0425-0505 125
TOTAL 250
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
2/4/2014 1030-1330 172 See attachments See attachments
TOTAL 172
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL 0
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL 0
3/12/2014
4:56 PM
TOTAL
Unplanned Events < 1 Hour
250
Unplanned Events> 1 Hour
172
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events> 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
11,737
Assist
0
TOTAL FLARED VOLUME
12,159
3/12/2014
4:56 PM
Flare Start Date 02/01/2014
Flare End Date 02/28/2014
FS2 Flare Report
Total Volume (MSCF) 422
Report
Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
14-20 Controlled Blowdown 02/04/2014 10:30:00 am 1:30:00 pm 180 min No
Determination Cause S/I and depressured C/L 16D fully to flare for anchor chop work.
Action Taken Completed depressunng.
IM
No
BPIIWAGNERJ 172
Total Volume (MSCF) 422
Generated 03/04/2014 2:15:08PM Page 6 of 9
Hunt, Jennifer L (DOA
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com)
Sent: Tuesday, February 18, 2014 9:56 AM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, HSSEE Env Adv West; Burgess, David H; Hauger, Wayne A; AK, OPS
CCP CGF OSM; AK, OPS CCP OTL; AK, OPS FS2 Facility OTL; AK, OPS FS2 OSM; AK,
OPS FSI OSM; AK, OPS FS1 Facility OTL; AK, HSSEE Env Adv Central; AK, HSSEE Env
Adv East; AK, OPS PCC EOC TL
Subject: Gas flaring events at FS2, FS1, CCP
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
iennifer.huntna.alaska.gov dave.robv(@alaska.gov victoria ferouson aaalaska.00v
From: Kellie Okonek, GPB Production Optimization Team Leader
A flaring event occurred at FS2 starting at 02/04/2014 10:30 and stopping at 02/04/2014 13:30 with a volume of 172
(MSCF). The event lasted for 180 minutes and was due to blowdown of 16D commontine for planned maintenance.
A flaring event occurred at CCP starting at 02/08/2014 02:30 and stopping at 02/08/2014 06:30 with a volume of 304
(MSCF). The event lasted for 60 minutes and was due to FFGU depressurization when supply was switched back to CGF
FFG.
A flaring event occurred at FS1 starting at 02/09/2014 16:20 and stopping at 02/09/2014 16:35 with a volume of 5573
(MSCF). The event had a volume greater than 5000 (MSCF) and was due to LIPS compressors shutdown due to supply
unit failure. Flaring stopped when the power supply was replaced and the compressors were loaded.
Please let me know if you have any questions.
Kellie Okonek (alt. Travis Rybicki)
PCC/EOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 382 1370 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akopspcceoctl(5bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000029
2. Facility Name
PBU FS 2
3. Field
PBL)- EOA
4. Operator
BP
5. Month/Year of Disposition
March -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. ReinjectedO
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
12,288
11. Assist Gas
0
12. Fuel gas used in lease operations.
787,516
13. Other (see instructions)
U
Official Use Only
Authorization>1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
799,804
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
345,474
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-16,975,306
19. Remarks:
I hereby certify thatN foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Mana er Production Taxes and Royalties Alaska to pressure of 14.65 psla and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date �� AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPnSITInN
1. Facility Number
0290000029
2. Facility Name
PBU FS 2
3. Field
PBU - EOA
4. Operator
BP
5. Month/Year of Disposition
Aril -2014
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Q
Pool Name Pool Code Percent
7. Reinjected
O
PRUDHOE 640150 100.00%-
8. Flared or vented 1 hour or less
3,827
9. Flared or vented more than 1 hour (see instr.)
6
10. Pilot and Purge
11,894
11. Assist Gas
675
12. Fuel gas used in lease operations.
742,570
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
�
MCF
14. TOTAL VOLUME (ITEMS 6.12)
758,972
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
322,696
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-16,566,241
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
/ /��^,n Note: All volumes must be corrected
Signature e/ rAlf tk ,tid�Yy�l Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date ! AAC25.235.
6/2 ¢//4
Form 10-422 Rev. 52009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -2
GAS FLARING INCIDENT REPORT
April 2014
4/14/2014 0920-1015 3,819 Not required for unplanned events <=1 hr
4/25/2014 1356-1359 8
TOTAL 3,827
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr
See attachments
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL 0
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
4/6/2014 1410-1530 6 See attachments See attachments
TOTAL 6
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
TOTAL
3,827
0
0
6
11,894
675
16,402
Page 4
5/15/2014
10:51 AM
Flare Start Date 04/01/2014
Flare End Date 04/30/2014
FS2 Flare Report Total Volume (MSCF) 3833
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
14-113 Controlled Blowdown 04/06/2014 2:10:00 pm 3:30:00 pm 80 min No No Yes BPI\BARKER) 6
Determination Cause Swapped compressors from 1802 to 1801 for scheduled maintenance
Action Taken Brought on 1801 standby compressor
Total Volume (MSCF) 3833
Generated 05/05/2014 10:32:25AM Page 4 of 9
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000029
2. FacilityName
PBU FS 2
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
May -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
B. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
12,279
11. Assist Gas
1,916
12. Fuel gas used in lease operations.
690,237
13. Other (see instructions)
0
Official Use Only
Authorization hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
704,432
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
318,232
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-17,127,056
19. Remarks:
I hereby certify that the foregoing is We and correct to the best of my knowledge.
pn'�,�1
Signature (.}i(,4V K Title Manager Production Taxes and alties Alaska
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.
Printed Name Diane Colley Phone (907) 564-5775 Date /
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1, Facility Number
0290000029
2. Facility Name
PBU FS 2
3. Field
PBU - EOA
4. Operator
BP
5. Month/Year of Disposition
June -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
O
Pool Name Pool Code Percent
7. Reinjected
O
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
11,950
11. Assist Gas
46
12. Fuel gas used in lease operations.
696,463
13. Other (see instructions)
0
Official Use Only
Authorization>1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
708,459
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
U
Waste:
MCF
17. Transferred from: CGF
312,141
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-16,266,080
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature V6X(/ Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
tj / temperature of 60o F. Authority 20
Printed Name Diane Colley/t% Phone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000029
2. Facility Name
PBU FS 2
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
July -2014
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
O
PRUDHOE 640150 100.007/.--
00.00%8.
8.Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
41,870
10. Pilot and Purge
13,702
11. Assist Gas
4,329
12. Fuel gas used in lease operations.
486,307
13. Other (see instructions)
0
Official Use Only
Authorization >1 he
Safety
, v
�! � / �
MCF
14. TOTAL VOLUME (ITEMS 6.12)
546,208
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
211,290
LJ _ /
T
Commissioner Date(
18. Transferred to: (Express as a negative #) CGF
-11,061,697
19. Remarks:
I hereby certify that the foregping is true and correct to the best of my knowledge.
Q//L�l(/i/�lA� Note: All volumes must be corrected
Signature W� Title Mana er Production Taxes and Ro allies Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
v1,r
9/¢11/
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT -FS -2
GAS FLARING INCIDENT REPORT
July 2014
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT& CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <=1 hr Not required for unplanned events <= 1 hr
TOTAL 0
7/11/2014 0832-1104
75 See attachments
See attachments
7/26/2014 0430-0830
10,250
TOTAL
10,325
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
TOTAL
0
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME
VOLUME DESCRIPTION OF INCIDENT&CAUSE
ACTIONTAKEN TO ELIMINATE CAUSE
7/6/2014 0200-0400
1,036 See attachments
See attachments
7/9/2014 1633-1741
473
7/13/2014 1422-1657
1,036
7/20/2014 1515-2400
4,000
7/20/2014 1515-2400
25,000
TOTAL
31,545
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events> 1 Hour
10,325
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events> 1 hour or
31,545
exceeding 5,000 MCF
Pilot Purge
13,702
Assist
4,329
TOTAL FLARED VOLUME
59,901
Page 5
8/14/2014
2'.23 PM
Flare Start Date 07/01/2014
Flare End Date 07/31/2014
FS2 Flare Report Total Volume (MSCF) 41870
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
14-233 Flare Relief 07/06/2014 2:00:00 am 4:00:00 am 120 min No No Yes BP1\REIMBT 1036
Determination Cause DS 9 "E/A" common line depressure for planned maintenance. Installing Smart Pig Receiver Launchers.
Action Taken Completed depressuring.
14-232 Flare Relief 07/09/2014 4:33:00 pm 5:41:00 pm 68 min No No
Yes
BP1\REIMBT
473
Determination Cause Depressured DS 09 "E" Common Line for Smart Pigging.
Action Taken Completed depremuring.
14-241 Flare Relief 07/11/2014 8:32:00 am 11:04:00 am 152 min Yes No
No
BP1\PHELJ3
75
Determination Cause STV -IP T\C 1802 shutdown due to controninstrumentation failure associated with HHL on the fuel gas knockout drum.
Action Taken Loaded STV/IP T/C.
14-245 Controlled Blowdown 07/13/2014 2:22:00 pm 4:57:00 pm 155 min No No
Yes
BPI\MITCHEB
1036
Determination Cause Depressured 9-E and 9-A commonlines to support ILI pigging.
Action Taken Completed depressuring.
14-262 Controlled Blowdown 07/20/2014 3:15:00 pm 12:00:00 am 525 min No No
Yes
BP1\RALPHJM
4000
Determination Cause S/I and depressured Plant and DS lines for residue gas line maintenance. (M272)
Action Taken Completed Plant Depressuring.
14-262 Controlled Blowdown 07/20/2014 3:15:00 pm 12:00:00 am 525 min No No
Yes
BP1\RALPHJM
25000
Determination Cause Depressured ECA residue gas transit system along with FS -1 for valve replacement. (M255)
Action Taken Completed transit gas system depressuring.
14-272 Controlled Blowdown 07/26/2014 4:30:00 am 8:30:00 am 240 min No No
No
BP1\BARKERJ
10250
Determination Cause Depressued gas transit line from 290 psig due to a pig sig leak at FS1 pig trap module
Action Taken Depressured to Flare at FS2
Total Volume (MSCF) 41870
Generated 08/04/2014 11:24:17AM Page 6 of 11
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent: Sunday, July 20, 2014 11:29 AM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, OPS PCC EOC TL; AK, HSSEE Env Adv East; Burgess, David H; AK,
OPS FS1 Facility OTL; AK, OPS FS1 OSM; AK, OPS FS2 Facility OTL; AK, OPS FS2 OSM;
AK, OPS FS3 Facility OTL, AK, OPS FS3 OSM; AK, OPS GPMA Facility OTL; AK, OPS
GPMA OSM; Hiester, Wendy
Subject: Gas flaring events at FS1,IR&2# FS3, LPC
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
4ennifer.hunt(cDalaska.gov dave.roby(c)alaska.gov victoria.ferguson(7Dalaska.gov
From: Kellie Okonek, GPB Production Optimization Team Leader
FS1
A flaring event occurred at FS1 starting at 07/10/2014 22:35 and stopping at 07/10/2014 23:10 with a volume of 6597
(MSCF). The event had a volume greater than 5000 (MSCF) and was due to high gas transit line pressure caused by
CCP compressor problems due to 1805 shutdown. Flaring stopped when 1805 was loaded.
FS2
A flaring event occurred at FS2 starting at 07/06/2014 02:00 and stopping at 07/06/2014 04:00 with a volume of 1036
(MSCF). The event lasted for 120 minutes, and was due to depressurization of DS9 commonline for planned
maintenance.
A flaring event occurred at FS2 starting at 07/09/2014 16:33 and stopping at 07/09/2014 17:41 with a volume of 473
(MSCF). The event lasted for 68 minutes, and was due to depressurization of DS9 commonline for smart pigging.
A flaring event occurred at FS2 starting at 07/11/2014 08:32 and stopping at 07/11/2014 11:04 with a volume of 75
(MSCF). The event lasted for 152 minutes, and was due to STV -IP T\C 1802 shutdown due to control\instrumentation
failure associated with HHL on the fuel gas knock out drum. Flaring stopped when compressor was loaded.
A flaring event occurred at FS2 starting at 07/13/2014 14:22 and stopping at 07/13/2014 16:57 with a volume of 1036
(MSCF). The event lasted for 155 minutes, and was due to depressurization of 9E/9A commonlines for smart pigging.
FS3
A flaring event occurred at FS3 starting at 07/11/2014 12:30 and stopping at 07/11/2014 18:00 with a volume of 5334
(MSCF). The event lasted for 330 minutes. The event had a volume greater than 5000 (MSCF), and was due to blowdown
of all common lines, residue gas line, and facility vessels/piping for planned turnaround.
LPC
A flaring event occurred at LPC starting at 06/14/2014 20:37 and stopping at 06/15/2014 with a volume of 15325 (MSCF).
The event was a black smoke event. The event lasted for 203 minutes. The event had a volume greater than 5000
(MSCF), and was due to 1808 re-injection compressor shutdown in preparation for full plant planned shutdown.
A flaring event occurred at LPC starting at 06/15/2014 00:01 and stopping at 06/15/2014 17:30 with a volume of 9560
(MSCF). The event was a black smoke event. The event lasted for 1049 minutes. The event had a volume greater than
5000 (MSCF), and was due to depressurization of the residue gas line and commonlines through LPC for planned
shutdown.
A flaring event occurred at LPC starting at 06/28/2014 18:58 and stopping at 06/28/2014 19:03 with a volume of 81
(MSCF). The event was a black smoke event, and was due to 1808 Reinjection compressor shutdown because of
control/instrumentation failure. Flaring stopped when compressor was repaired and re -loaded.
Please let me know if you have any questions.
Kellie Okonek (alt. Travis Rybicki)
PCC/EOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 382 1370 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akopspcceoctl(aft.com
Hunt, Jennifer L (DOA
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent: Tuesday, July 22, 2014 8:14 AM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, HSSEE Env Adv East; Burgess, David H; AK, OPS FS1 Facility OTL; AK,
OPS FSI OSM; AK, OPS FS2 Facility OTL; AK, OPS FS2 OSM; AK, HSSEE Env Adv West;
Hiester, Wendy; AK, OPS GC3&PCC OSM; AK, OPS GC3 Facility & Field OTL; Kruger, Dale
0; AK, OPS PCC EOC TL
Subject: Gas flaring events at FS1,OWGC3
Categories: Work
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
lennifer.huntncalaska.gov dave.roby(3alaska.gov victoria.fergusont?a.alaska.gov
From: Kellie Okonek, GPB Production Optimization Team Leader
FSI:
A flaring event occurred at FS1 starting at 07/20/2014 14:25 and stopping at 07/20/2014 16:15 with a volume of 1474
(MSCF). The event lasted for 110 minutes, and was due to depressurization of commonlines and vessels in support of
planned shutdown to change out F5000ESD valve on the gas transit system.
A flaring event occurred at FS1 starting at 07/20/2014 10:40 and stopping at 07/20/2014 10:56 with a volume of 41
(MSCF). The event was a black smoke event, and was due to testing of ESD function of T/C 1803 as it shutdown for the
plant shutdown.
A flaring event occurred at FS1 starting at 07/20/2014 16:30 and stopping at 07/20/2014 23:59 with a volume of 25000
(MSCF). The event lasted for 449 minutes. The event had a volume greater than 5000 (MSCF), and was due to the
controlled depressurization of the 42" and 60" gas transit lines in support of safe -out for the F5000V ESD valve
changeout.
FS2:
A flaring event occurred at FS2 starting at 07/20/2014 15:15 and stopping at 07/21/2014 with a volume of 4000 (MSCF).
The event lasted for 525 minutes, and was due to shut-in and depressurization of vessels and commonlines for planned
plant shutdown for F5000V changeout.
GC3:
A flaring event occurred at GC3 starting at 07/20/2014 08:15 and stopping at 07/20/2014 10:30 with a volume of 122
(MSCF). The event lasted for 135 minutes, and was due to high gas transit line pressure as the Prudhoe east facilities
ramped down for planned maintenance. Flaring stopped when the system stabilized.
Please let me know if you have any questions.
Kellie Okonek (alt. Travis Rybicki)
PCC/EOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 382 1370 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akopspcceoctlCa)bo.com
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj
Sent: Friday, July 25, 2014 5:31 PM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, OPS PCC EOC TL; AK, HSSEE Env Adv East; Burgess, David H; AK,
HSSEE Env Adv West; AK, OPS GC3&PCC OSM; AK, OPS GC3 Facility & Field OTL;
Kruger, Dale O; AK, OPS GC1 OSM; AK, OPS GCI Facility OTL; AK, OPS FS2 OSM; AK,
OPS FS2 Facility OTL
Subject: RE: Gas flaring events at FS1,IMMGC3
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
iennifer.huntCa,alaska.gov dave.roby(cDalaska.gov victoria.fergusonCcDalaska.gov
From: Kellie Okonek, GPB Production Optimization Team Leader
GCI:
A flaring event occurred at GC1 starting at 07/24/2014 00:00 and stopping at 07/25/2014 with a volume of 2404 (MSCF).
The event lasted for 1440 minutes, and was due to low oil rate flaring from the LP/IP.
A flaring event occurred at GC1 starting at 07/23/2014 00:00 and stopping at 07/24/2014 with a volume of 2946 (MSCF).
The event lasted for 1440 minutes, and was due to low oil rate flaring from the LP/IP.
GC3
A flaring event occurred at GC3 starting at 07/24/2014 16:24 and stopping at 07/24/2014 16:44 with a volume of 28472
(MSCF). The event had a volume greater than 5000 (MSCF), and was due to a power loss in the LPS section. Flaring
stopped when rates were reduced.
FS2:
A flaring event occurred at FS2 starting at 07/20/2014 15:15 and stopping at 07/21/2014 with a volume of 4000 (MSCF).
The event lasted for 525 minutes, and was due to S/I and depressure of plant and drillsite lines for residue gas line
maintenance
A flaring event occurred at FS2 starting at 07/20/2014 15:15 and stopping at 07/21/2014 with a volume of 25000 (MSCF).
The event lasted for 525 minutes. The event had a volume greater than 5000 (MSCF), and was due to depressure of EOA
residue gas transit system along with FS -1 for planned ESD valve replacement.
Please let me know if you have any questions.
Kellie Okonek (alt. Travis Rybicki)
PCC/EOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 382 1370 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akoosocceoctl(a bo.com
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent: Sunday, July 27, 2014 11:47 AM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, HSSEE Env Adv East; Burgess, David H; AK, HSSEE Env Adv West;
Kruger, Dale O; AK, OPS GC1 OSM; AK, OPS GC1 Facility OTL; AK, OPS FS2 OSM; AK,
OPS FS2 Facility OTL; AK, OPS PCC EOC TL
Subject: Gas flaring events atm, GC1
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
iennifer.hunt(a)alaska.gov dave.robv(a)alaska.gov victoria.fenquson(o alaska.gov
From: Kellie Okonek, GPB Production Optimization Team Leader
GC9 :
A flaring event occurred at GC1 starting at 07/26/2014 00:02 and stopping at 07/27/2014 with a volume of 4402 (MSCF).
The event lasted for 1438 minutes, and was due to low oil rate flaring from the LP/IP.
A flaring event occurred at GC1 starting at 07/25/2014 00:26 and stopping at 07/26/2014 with a volume of 960 (MSCF).
The event lasted for 1414 minutes, and was due to low oil rate flaring from the LP/IP.
FS2:
A flaring event occurred at FS2 starting at 07/26/2014 04:30 and stopping at 07/26/2014 08:30 with a volume of 10
(MSCF). The event lasted for 240 minutes, and was due to depressurization of the gas transit line due to a pig sig issue at
the FS1 flare manifold. Flaring stopped when line depressured.
Please let me know if you have any questions.
Kellie Okonek (alt. Travis Rybicki)
PCC/EOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 382 1370 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akopspcceoctlObo.com
Hunt Jennifer L (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent: Tuesday, July 29, 2014 6:07 PM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, HSSEE Env Adv East; Burgess, David H; AK, HSSEE Env Adv West;
Kruger, Dale O; AK, OPS GC1 OSM; AK, OPS GCI Facility OTL; AK, OPS FS2 OSM; AK,
OPS FS2 Facility OTL
Subject: Gas flaring events aIM, GC1
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
jennifechunt(a.alaska.gov dave.robvCaalaska.gov victoria.ferguson(o)alaska.gov
From: Kellie Okonek, GPB Production Optimization Team Leader
GC1:
A flaring event at GCI starting at 07/28/2014 00:04 and stopping at 07/28/2014 23:35 with a volume of 6633 (MSCF). The
event lasted for 1411 minutes. The event had a volume greater than 5000 (MSCF), and was due to low oil rate flaring off
the LP/IP due to reduced rates during the CGF TAR.
A flaring event at GC1 starting at 07/27/2014 00:00 and stopping at 07/28/2014 with a volume of 10024 (MSCF). The
event lasted for 1440 minutes. The event had a volume greater than 5000 (MSCF), and was due to low oil rate flaring off
the LP/IP due to reduced rates during the CGF TAR.
FS2:
at FS2 starting at 07/26/2014 04:30 and stopping at 07/26/2014 08:30 with a volume of 10250 (MSCF). The event lasted
for 240 minutes. The event had a volume greater than 5000 (MSCF), and was due to depressurization of the gas transit
line due to needed repairs at FS1.
Please let me know if you have any questions.
Kellie Okonek (alt. Travis Rybicki)
PCC/EOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 382 1370 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akopsocceoctl anbo.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000029
2. Facility Name
PBU FS 2
3. Field
PBU - EOA
4. Operator
BP
5. Month/Year of Disposition
August -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
O
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
70
9. Flared or vented more than 1 hour (see instr.)
5,948
10. Pilot and Purge
12,396
11. Assist Gas
6,405
12. Fuel gas used in lease operations.
692,119
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
�g
MCF
14. TOTAL VOLUME (ITEMS 6.12)
716,938
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
01
Waste:
MCF
17. 17. Transferred from: CGF
322,155
z Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-12,279,839
19. Remarks:
I hereby certify that foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature W r '� Title Mana er Production Taxes and Ro allies Alaska tO pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date 1� AAC25.235.
VL
lol��I�
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT -FS -2
GAS FLARING INCIDENT REPORT
August 2014
Not required for unplanned events <= 1 hr
TOTAL 0
TIME
See attachments
TOTAL 0
8/13/2014 2300-2400
35 See attachments
8/15/2014 2000-2030
35
TOTAL
70
Planned Events Exceeding 1 Hour OR > 5,000 Ind
DATE TIME
VOLUME DESCRIPTION OF W
8/27/2014 0300-1730
4,228 See attachments
8/28/2014 2023-2400
856
8/28-29/2014 2023-1630
864
TOTAL
5,948
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events> 1 Hour
0
Planned Events < 1 hour and not
70
exceeding 5,000 MCF
Planned Events> 1 hour or
5,948
exceeding 5,000 MCF
Pilot Purge
12,396
Assist
6,405
TOTAL FLARED VOLUME
24,819
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <=1 hr
See attachments
See attachments
See attachments
Page 5
9/15/2014
4:46 PM
FlareStartDate 08/01/2014
Flare End Date 08/31/2014
FS2 Flare Report
Total Volume (MSCF) 6018
Report
Numbs System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
14-306 Controlled Slowdown 08/13/2014 11:00:00 pm 12:00:00 am 60 min No No Yes BP1\RALPHJM 35
Determination Cause Depressured CIL 11D for smart pig launcher/receiver removal.
Action Taken Completed line depressuring.
14-307 Controlled Blowdown 08/15/2014 8:00:00 pm 8:30:00 pm 30 min No No Yes BP1\BARKERJ 35
Determination Cause Blew down 11D CL to remove Pig Reciever
Action Taken Completed Blowdown
14-323 Controlled Slowdown 08/27/2014 3:00.00 am 5:30:00 pm 870 min No No Yes BP1\BOOKAP 4228
Determination Cause -RC 1801 shutdown for planned maintenance. 4000 hour inspection.
Action Taken Loaded STV/IP TIC. After 1801 spare turbine was installed we started it and got off Flare.
14-326 Controlled Blowdown 08/28/2014 10:23:00 pm 12:00:00 am 97 min No No Yes BP1\BOOKAP
Determination Cause Depressuring 16"D" and 17D" Common lines for sheduled maintenance more during the AIL outage.
Action Taken Completed depressunng common lines but" are Floating on flare to depressure the EOA Transit A/L Line for maintenance.
14-326 Controlled Blowdown 08/28/2014 10:23:00 pm 12:00:00 am 97 min No No Yes BP1\BOOKAP
Determination Cause Helped FSI depressure the EOAAIL line to flare pressure.
Action Taken Completed depressuring.
14-331 Controlled Blowdown 08/29/2014 12:00:00 am 4:30:00 pm 990 min No No Yes BP1\BOOKAP
Determination Cause Helped FS1 depressure the EOA AIL line to Flare pressure.
Action Taken Completed depressuring.
856
77
787
Total Volume (MSCF) 6018
Generated 09/09/2014 1:36:11 PM Page 6 of 10
Hunt, Jennifer L (DOA
From:
AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent:
Friday, August 29, 2014 12:17 PM
To:
Hunt, Jennifer L (DOA)
Cc:
Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, HSSEE Env Adv West; Kruger, Dale O; AK, OPS GC1 OSM; AK, OPS
GC1 Facility OTL; AK, HSSEE Env Adv East; AK, OPS FS2 Facility OTL; AK, OPS FS2 OSM;
Burgess, David H; AK, OP P EOC TL
Subject:
Gas flaring events at GCI,
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
iennifer.hunt(d)alaska.gov dave.robv(a)alaska.gov victoria.ferguson goalaska.gov
From: Kellie Okonek, GPB Production Optimization Team Leader
A flaring event occurred at FS2 starting at 08/28/2014 22:23 and stopping at 08/29/2014 with a volume of 856 (MSCF).
The event lasted for 97 minutes, and was due to depressurization of 16/17D commonlines for planned work during the AIL
outage.
A flaring event occurred at FS2 starting at 08/27/2014 03:00 and stopping at 08/27/2014 17:30 with a volume of 4228
(MSCF). The event lasted for 870 minutes, and was due to T/C 1801 s/d for planned 4000 hr inspection.
A flaring event occurred at GC1 starting at 08/25/2014 10:14 and stopping at 08/25/2014 20:11 with a volume of 2501
(MSCF). The event lasted for 597 minutes, and was due to low oil rate flaring. Flaring stopped when rates stabilized
above 55 mbd.
Please let me know if you have any questions.
Kellie Okonek
PCC/EOC Production Optimization TL
Office: (907) 659-4472
Cell: (907) 382-1370
akopspcceoctl@bp.com
Hunt, Jennifer L (DOA
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent: Saturday, August 30, 2014 3:09 PM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, HSSEE Env Adv West; Kruger, Dale O; AK, OPS GC1 OSM; AK, OPS
GC1 Facility OTL; AK, HSSEE Env Adv East, AK, OPS FS2 Facility OTL; AK, OPS FS2 OSM;
Burgess, David H; AK, OPOSM; AK, OPS FS3 Facility OTL
Subject: Gas flaring events at GC1,FS3
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
iennifer.hunt(a alaska.gov dave.robvna.alaska.gov victoria.ferguson(a alaska.gov
From: Kellie Okonek, GPB Production Optimization Team Leader
A flaring event occurred at GC1 starting at 08/29/2014 08:30 and stopping at 08/29/2014 09:45 with a volume of 770
(MSCF). The event lasted for 75 minutes, and was due to shutdown of GLT 3200 and depressurization for planned
maintenance.
A flaring event occurred at FS2 starting at 08/29/2014 00:00 and stopping at 08/29/2014 16:30 with a volume of 787
(MSCF). The event lasted for 990 minutes, and was due to depressurization of East side lift gas line for planned
maintenance.
A flaring event occurred at FS3 starting at 08/29/2014 00:28 and stopping at 08/29/2014 01:49 with a volume of 70
(MSCF). The event lasted for 81 minutes, and was due to depressurization of the East side lift gas line for planned
maintenance.
Please let me know if you have any questions.
Kellie Okonek
PCC/EOC Production Optimization TL
Office: (907) 659-4472
Cell: (907) 382-1370
akopspcceoctl@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000029
2. Facility Name
PBU FS 2
3. Field
PBU - EOA
4. Operator
IBP
5. MonthNear of Disposition
I September -2014
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
p
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
11,642
10. Pilot and Purge
12,011
11. Assist Gas
22,905
12. Fuel gas used in lease operations.
436,431
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
482,989
Lease Use
MCF
15. NGL Gas Equivalent
p
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:CGF
202,834
3-Z3—(S
18. Transferred to: (Express as a negative #) CGF
-15,016,492
Commissioner Date
19. Remarks:
I hereby certify that th foregoing is true and correct to the best of my knowledge.
yV Note: All volumes must be corrected
Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date /V/J AAC25.235.
VTC
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
DATE
TOTAL
[7
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -2
GAS FLARING INCIDENT REPORT
September 2014
DESCRIPTION OF INCIDENT & CAUSE
Not required for unplanned events <= 1 hr
Not required for unplanned events <= 1 hr
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
9/4-6/2014
1311-2158
9,888 See attachments See attachments
9/8/2014
1424-2104
1,190
TOTAL
11,078
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
TOTAL 0
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
9/1/2014 0830-1130 564 See attachments See attachments
TOTAL 564
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
TOTAL
0
11,078
0
564
12,011
22,905
46,558
Page 5
10/14/2014
11:24 AM
Flare Start Date 09/01/2014
Flare End Date 09/30/2014
FS2 Flare Report
Total Volume (MSCF) 11642
Report
Numbs System Date Start Time Stop Time Duration Intermittent
Black Smoke Planned Reported By Volume
14-339 Controlled Blowdown 09/01/2014 8:30:00 am 11:30:00 am 180 min No
No Yes BP10OOKAP 564
Determination Cause Depressured 9A common line shutdown for planned maintenance
Action Taken Completed depressuring of 9A common line for line work.
14-350 Controlled Blowdown 09/04/2014 1:11:00 pm 12:00:00 am 649 min Yes
No No BP1\WAGNERJ 1984
Determination Cause 1801 SO due to a high OG exhaust gas temp. deviation.
Action Taken Facility at minimum rates.
14-355 Controlled Slowdown 09/05/2014 12:00:00 am 12:00:00 am 1440 min Yes
No No BP7\WAGNERJ 4127
Determination Cause 1801 SID due to high GG exhaust gas temp.
Action Taken Facility is at minimum rates.
14-356 Controlled Blowdown 09/06/2014 12:00:00 am 9:58:00 pm 1318 min Yes
No No BP1\WAGNERJ 3777
Determination Cause 1801 S/D and GG replacement.
Action Taken Plant at minimum rates, GG replaced.
14-363 Controlled Blowdown 09/08/2014 2:24:00 pm 9:04:00 pm 400 min Yes
No No BP11WAGNERJ 1190
Determination Cause 1801 S/D TO ADJUST IGVS.
Action Taken FINISHED IGV ADJUSTMENT.
Total Volume (MSCF) 11642
Generated 10/02/2014 2:36:16PM Page 5 of 10
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com)
Sent: Tuesday, September 16, 2014 12:01 PM
To: Hunt, Jennifer L (DOA)
Cc: Roby, David S (DOA); Ferguson, Victoria L (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; Burgess, David H; AK, OPS GC3&PCC OSM, AK, OPS FSI OSM; AK, OPS
FS1 Facility OTL; AK, OPS FS2 OSM; AK, OPS FS2 Facility OTL; AK, OPS FS3 OSM; AK,
OPS FS3 Facility OTL
Subject: Flaring events at FS1, FS2, and FS3
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson,
AOGCC
Jennifer huntCaalaska.gov dave robv@alaska.gov
victoria.ferq uson Cccilalaska.aov
From: Wendy Hiester, GPB Production Optimization Team Leader
In the first half of September, the following flaring events occurred at FS1, FS2, and FS3
9/14 FS1
A flaring event occurred at FSI starting at 09/14/2014 00:00 and stopping at 09/14/2014 01:30 with a volume of 1065
(MSCF). The event lasted for 90 minutes.
Flaring occurred due to depressuring of the DS12 commonlines for 12-C pig launcher and receiver installation. Flaring
stopped when depressuring was completed.
9/8 FS2
A flaring event occurred at FS2 starting at 09/08/2014 14:24 and stopping at 09/08/2014 21:04 with a volume of 1190
(MSCF). The event lasted for 400 minutes. Flaring occurred when the 1801 compressor was shut down to adjust the inlet
gas valves. Flaring stopped when the compressor was restarted.
9/6 FS2
A flaring event occurred at FS2 starting at 09/06/2014 00:00 and stopping at 09/06/2014 21:58 with a volume of 3777
(MSCF). The event lasted for 1318 minutes. Flaring occurred when the 1801 compressor shut down due to high gas
generator exhaust temperature. FS2 reduced to minimum rates to reduce flaring.
9/5 FS2
A flaring event occurred at FS2 starting at 09/05/2014 00:00 and continuing to 9/6/2014 with a volume of 4127 (MSCF).
The event lasted for 1440 minutes. Flaring occurred when the 1801 compressor shut down due to high gas generator
exhaust temperature. FS2 reduced to minimum rates to reduce flaring.
9/4 FS2
A flaring event occurred at FS2 starting at 09/04/201413:11 and continuing to 09/05/2014 with a volume of 1984
(MSCF). The event lasted for 649 minutes. Flaring occurred when the 1801 compressor shut down due to high gas
generator exhaust temperature. FS2 reduced to minimum rates to reduce flaring.
9/1 FS2
A flaring event occurred at FS2 starting at 09/01/2014 08:30 and stopping at 09/01/2014 11:30 with a volume of 564
(MSCF). The event lasted for 180 minutes. Flaring occurred due to depressuring the 9A common line shutdown for
planned maintenance. Flaring stopped when depressuring was completed.
9/12 FS3
A flaring event occurred at FS3 starting at 09/12/2014 00:01 and stopping at 09/12/2014 17:40 with a volume of 5250
(MSCF). The event lasted for 1059 minutes. The flaring occurred when STV -IP compressor 1802 unloaded due to a bad
gas controller. The problem was found, the 1802 compressor was shut down at 13:10, and the flaring stopped when the
compressor was restarted.
9/11 FS3
A flaring event occurred at The flare web application has reported a flare event (ID 8420) at FS3 starting at 09/11/2014
22:00 and continued into 09/12/2014 with a volume of 583 (MSCF). The event lasted for 120 minutes. The problem was
found on 9/12/2014, the 1802 compressor was shut down, and the flaring stopped when the compressor was restarted.
Please let me know if you have any questions.
Wendy Hiester (alt. Kellie Okonek)
PCCIEOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 227-7144 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akoospcceoctI@bo com
2
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
RECEIVED
NOV 18 2014
AOGCC
1. Facility Number
0290000029
2. Facility Name
PBU FS 2
3. Field
PBU - EOA
4. Operator
BP
5. Month/Year of Disposition
October -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
U
PRUDHOE 640150 100.00%
B. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
12,381
11. Assist Gas
4,448
12. Fuel gas used in lease operations.
713,908
13. Other (see instructions)
0
Official Use Only
Authorization >7 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
730,737
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
waste:
MCF
17. Transferred from: CGF
307,479
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-16,917,052
19. Remarks:
I hereby certify that the �to the best of my knowledge.
e foregoing is true and correct
1 i�/ (yt ' Y Note: All volumes must be corrected
Signature QG(lGilf °' Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a
'I I temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
RECEIVED
DEC 16 2014
1. Facility Number
0290000029
2. Facility Name
PBU FS 2
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
November -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
250
9. Flared or vented more than 1 hour (see instr.)
5,262
10. Pilot and Purge
11,973
11. Assist Gas
13,301
12. Fuel gas used in lease operations.
707,297
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
d 2 (o Z
MCF
14. TOTAL VOLUME (ITEMS 6-12)
738,083
Leese Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
305,128
i
1 _ _ /15—
(
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-17,424,357
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
/^ Note: All volumes must be corrected
Signature �`W Title Mana er Production Taxes and Ro alties Alaska to pressure Of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Coll2y Phone (907) 564-5775 Date AAC25.235.
V rL-
l! r6/15-
Form
6/{S
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -2
GAS FLARING INCIDENT REPORT
November 2014
MLO6
OEC 16 2014 Page
p® CC
Unplanned Events less than or equal to 1 hour 1
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
11/13/2014 0425-0449 168 Not required for unplanned events <=1 hr Not required for unplanned events <=1 hr
11/19/2014 2052-2309 82
TOTAL 250
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
11/23/2014
1435-2040
1,232 See attachments
See attachments
TOTAL
TOTAL
1,232
TOTAL
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
250
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
exceeding 5,000 MCF
See attachments
See attachments
TOTAL
0
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
11/28/2014 0432-1828
4,030 See attachments See attachments
TOTAL
4,030
TOTAL
Unplanned Events < 1 Hour
250
Unplanned Events > 1 Hour
1,232
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
4,030
exceeding 5,000 MCF
Pilot Purge
11,973
Assist
13,301
TOTAL FLARED VOLUME
30,786
12/11/2014
9:41 AM
Flare Start Date 1110112014
Flare End Date 11/30/2014
FS2 Flare Report Tota) Volume (MSCF) 5512
Report
Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
�r
DEC 16 2014
rA-%r0GGC
14-484 Flare Relief 11/23/2014 2:35:00 pm 8:40:00 pm 365 min No No
Determination Cause STV -IP T\C 1801 shutdown due to a problem associated with high seal oil d/p.
Action Taken Loaded STVAP T/C.
14489 Flare Relief 11/28/2014 4:32:00 am 6:28:00 pm 836 min No
Determination Cause T\C 1801 shutdown for planned maintenance, 2000 inspection.
Action Taken Loaded SNAP T/C 1801 after 2000 hour inspection
No BP1\MITCHEB 1232
... ..... ...... . _..... .......... ..............
Daily Volume (MSCF) 1232
No Yes BP1\WAGNERJ 4030
Daily Volume (MSCF) 4030
Total Volume (MSCF) 5512
rage o or o
Genemled 12/02/2014 10:36:03AM
Hunt, Jennifer L (DOA)
From:
Sent:
To:
Cc:
Subject:
To: Jennifer Hunt, AOGCC
AOGCC
iennifer huntna.alaska.aov
ov
AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Monday, November 24, 2014 4:00 PM
Hunt, Jennifer L (DOA)
Loepp, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, HSSEE Env Adv East; AK, OPS FS1 Facility OTL; AK, OPS FS1 OSM;
Loader, Neil; AK, OPS PCC EOC TL; AK, OPS FS2 OSM; AK, OPS FS2 Facility OTL
Gas flaring events at FS1, F52 m
CC: Dave Roby, AOGCC CC: Victoria Ferguson,
dave robvCa.alaska.aov victoria ferguson(a)alaska.o
From: Kellie Okonek, GPB Production Optimization Team Leader
A flaring event occurred at FS1 starting at 11/23/2014 11:20 and stopping at 11/23/2014 18:40 with a volume of 2444
(MSCF). The event lasted for 440 minutes, and was due to sTv/IP compressor s/d to enable testing of new 1825
compressor.
A flaring event occurred at FS2 starting at 11/23/2014 14:35 and stopping at 11/23/2014 20:40 with a volume of 1232
(MSCF). The event lasted for 365 minutes, and was due to s/d of STV/IP 1801 compressor to due a problem with high
seal oil dp. Flaring stopped when the problem was fixed and the machine re -started.
Please let me know if you have any questions.
Kellie Okonek
PCC/EOC Production Optimization TL
Office: (907) 659-4472
Cell: (907) 382-1370
akopspcceoctl bp.com
Hunt, Jennifer L (DOA)
From:
Sent:
To:
Cc:
Subject:
To: Jennifer Hunt, AOGCC
AOGCC
iennifer huntCa7alaska.00v
a.00v
AK, RES GPB Central Prod Opt Engr<AKRESGPBCentralProdOptEngr@bp.com>
Monday, December 01, 2014 8:46 AM
Hunt, Jennifer L (DOA)
Loepp, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, HSSEE Env Adv East; AK, OPS FSI Facility OTL; AK, OPS FS1 OSM;
Loader, Neil; AK, OPS PCC EOC TL; AK, OPS FS2 OSM; AK, OPS FS2 Facility OTL
Gas flaring events at FS1 and 1T 4
CC: Dave Roby, AOGCC CC: Victoria Ferguson,
dave robvCo�alaska.gov victoria ferauson alask
From: Beverly Luedke-Chan for Kellie Okonek, GPB Production Optimization Team Leader
/2014 8:30 and
ping at
14 18:45
flaring
SCF). The event las edtforr 615 minutes,Iand 4was due to STV/IPpcompre so/r2sldOvolume 44
FSI startinat to enable est g of new 1825
(M
compressor.
A flaring event occurred at FS1 starting at 11/26/2014 8:30 and stopping at 11/26/2014 20:30 with a volume of 7900
(MSCF). The event lasted for 720 minutes, and was due to 1802 STV/IP compressor s/d to commission the new 1825
compressor.
A flaring event occurred at FS1 starting at 11/28/2014 8:30 and stopping at 11/28/2014 18:30 with a volume of 6583
(MSCF). The event lasted for 600 minutes, and was due to 1802 STV/IP compressor s/d to start-up the new 1825
compressor.
A flaring event occurred at FS2 starting at 11/28/2014 4:32 and stopping at 11/28/2014 18:28 with a volume of 4030
mai tenance.event F Flaring lasted
stopped when 'the problem was fixed and he mas, and was due to s/d of l hi e0compressor for planned
re -started.
arted
Please let me know if you have any questions.
Beverly Luedke-Chan
GPB Field Optimization Engineer, for
Kellie Okonek
PCC/EOC Production Optimization TL
Office: (907) 659-4472
Cell: (907) 382-1370
a ko pspcceoctl P bp.com
KtIL;L9i1 ALJ
JAN 16 2015
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION AOGCC
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number2.
0290000029
Facility Name
PBU FS 2
3. Field
PBU - EOA
4. Operator
IBP
5. Month/Year of Disposition
I December -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented l hour or less
176
9. Flared or vented more than 1 hour (see instr.)
342
10. Pilot and Purge
12,370
11. Assist Gas
1,800
12. Fuel gas used in lease operations.
720,523
13. Other (see instructions)
0
Official Use Only¢2
Authorization >I hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
735,211
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
312,926
Z--17—/5—
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-16,362,748
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
�� /j //1/] /f �1
Signature old libC� w I Title Manager Production Taxes and Royalties Alaska
ado
Note: All volumes must be corrected
to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
AAC25.235.
l
Printed Name Diane ColleyPhone (907) 564-5775 Date 1 11 /fh
VTf-
2 /.5//
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -2
GAS FLARING INCIDENT REPORT
December 2014
RECEIVED Page
JAN 16 2015
!i.. r± i'— r, (I ,
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 0
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
12/12/2014 0500-0550 71 See attachments See attachments
12/13/2014 0522-0620 71
12/24/2014 0400-0430 34
TOTAL 176
DATE TIME
VOLUME DESCRIPTION OF IN
12/21/2014 0716-0830
114 See attachments
12/22/2014 0719-0830
114
12/23/2014 0721-0845
114
TOTAL
342
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events > 1 Hour
0
Planned Events < 1 hour and not
176
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
342
12,370
1,800
14,688
ACTION TAKEN TO E
See attachments
1/1412015
10:49 AM
Generated 0108/2015 9:27:01AM Page 4 of 8
ED
rn8 i
Flare Start Date 1210112014
Flare End Date 12/3112014
7 F 2615
AN
FS2 Flare Report
Total Volume (MSCF)
518
Report
Numbe System Date Start Time Stop Time Duration
Intermittent Black Smoke
Planned Reported By
Volume
14-510 Flare Relief 12/12/2014 5:00:00 am 5:50:00 am 50 min
No No
Yes BP118ARKERJ
71
Determination Cause Commonline 3D taken out of service for maintenance work.
Action Taken Completed depressudng.
Daily Volume (MSCF)
71
14-509 Flare Relief 12/13/2014 5:22:00 am 6:20:00 am 58 min
No No
Yes BP1\BARKERJ
71
Determination Cause Commonline 3D taken out of service for maintenance work.
Action Taken Completed depmnudng.
Daily Volume (MSCF)
71
14-518 Controlled Blowdown 12121/2014 7:16:00 am 8:30:00 am 74 min
No No
Yes BP1\MrrCHEB
114
Determination Cause Shutdown and de-pressured 16D Commonline for anchor chop
work.
Action Taken Completed depressuring.
Daily Volume (MSCF)
114
14-519 Controlled Blowdown 12/22/2014 719:00 am 8:30:00 am 71 min
No No
Yes BPI\LALAJR
114
Determination Cause 16D common line depmssured for anchor chop.
Action Taken Completed depressudng.
Daily Volume (MSCF)
114
15-1 Controlled Blowdown 12/23/2014 7:21:00 am 8:45:00 am 84 min
No No
Yes BP1\RALPHJM
114
Determination Cause Depressured C/L 16 D for anchor chop work.
Action Taken Completed depmwudng.
Daily Volume (MSCF)
114
14-520 Controlled Blowdown 12/24/2014 4:00:00 am 4:30:00 am 30 min
No No
Yes BP1\REIMBT
34
Determination Cause Depressured'B" IP Separator as a precaution, external corrosion found on inlet piping.
Action Taken Completed depressunng.
Daily Volume (MSCF)
34
Total Volume (MSCF)
518
Generated 0108/2015 9:27:01AM Page 4 of 8
Hunt, Jennifer L (DOA)
From:
Sent:
To:
Cc:
Subject:
To: Jennifer Hunt, AOGCC
AOGCC
Lnnifer huntCc alaska.gov
ov
AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Saturday, January 10, 2015 12:40 PM
Hunt, Jennifer L (DOA)
Loepp, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, HSSEE Env Adv West; Loader, Neil; Hauger, Wayne A; AK, HSSEE
Env Adv East; AK, OPS FS3 Facility OTL, AK, OPS FS3 OSM; AK, OPS GC3&PCC OSM; AK,
OPS PCC EOC TL; AK, OPS FS2 Facility OTL; AK, OPS FS2 OSM; AK, OPS GPMA Facility
OTL; AK, OPS GPMA OSM
Flaring Events aIMM FS3, and LPC
CC: Dave Roby, AOGCC CC: Victoria Ferguson,
dave roby0alaska.gov victoria ferousonoalaska.o
From: Wendy Hiester, GPB Production Optimization Team Leader
FS2
A flaring event occurred at FS2 starting at 01/06/2015 10:45 and stopping at 01/06/2015 15:31 with a volume of
1390 (MSCF). The event lasted for 286 minutes and occurred when the 1801 compressor was shut down to
remove water found in the seal oil. Flaring stopped when the seal oil change out was completed and the
compressor was brought back on line.
A flaring event occurred at FS2 starting at 12/23/2014 07:21 and stopping at 12/23/2014 08:45 with a volume of
114 (MSCF). The event lasted for 84 minutes and occurred when C/L 16 D was depressured for anchor chop
work. Flaring stopped when depressuring was completed.
A flaring event occurred at FS2 starting at 12/22/2014 07:19 and stopping at 12/22/2014 08:30 with a volume of
114 (MSCF). The event lasted for 71 minutes and occurred when C/L 16D common line was shut down and
depressured for anchor chop work. Flaring stopped when depressuring was completed.
A flaring event occurred at FS2 starting at 12/21/2014 07:16 and stopping at 12/21/2014 08:30 with a volume of
114 (MSCF). The event lasted for 74 minutes and occurred when C/L 16D common line was shut down and
depressured for anchor chop work. Flaring stopped when depressuring was completed.
FS3
A flaring event occurred at FS3 starting at 12/16/2014 09:47 and stopping at 12/16/2014 10:07 with a volume of
9167 (MSCF). The event had a volume greater than 5000 (MSCF). The event occurred during Acoustic Testing
of the Main Gas outlet valve F6AV in 4922 which required closing the valve temporarily. Flaring stopped when
the acoustic test of F6AV was completed and the gas flow to through the valve was restored.
LPC
A flaring event occurred at LPC starting at 12/27/2014 12:21 and stopping at 12/27/2014 13:35 with a volume
of 5193 (MSCF). The event lasted for 74 minutes and occurred when the 1808 Reinjection compressor
shutdown because of control/instrumentation failure associated with C2 Compressor #2 Axial. Flaring stopped
when troubleshooting was completed, the compressor restarted, and the facility stabilized.