Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPBU FS 3 Gas DispositionState of Alaska AOGC C Gas Disposition Files Year: 2014 Facility: PBU FS 3 Operator: BP EXPLORATION (ALASKA) STATE OF ALASKA .T`ALASKA ' %m -r f%cAoonn irGn rosln[SPOSITION Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION llAii 1rV OCOnOT nF rmnnuCFn GAS DISPOSITION 1. Facility Number 2. Facility Name 0290000030 PBU FS 3 Disposition 3. Field PBU - EOA Volume MCF - 4. Operator 5. Month/Year of Disposition BP Februa -2014 20. For production from multiple pools, list contribution of each pool as a per o/ Total Volume. 6. Sold 0 Pool Name Pool Code Percent PRUDHOE 640150 100.00 7. Reinjected 0 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 14,895 11. Assist Gas 11 12. Fuel gas used in lease operations. 914,022 Official UsUMCF 13. Other (see instructions) 0 Authorization >l he Safety 14. TOTAL VOLUME (ITEMS 6-12) 928,928 Lease Use 15. NGL Gas Equivalent 0 Conservation 16. Purchased gas 0 Commissioner Date 17. Transferred from: CGF 928,917 18. Transferred to: (Express as a negative #) CGF -25,943,080 19. Remarks. . I hereby certify that the foregoing is true and correct to the best of my knowledge. n NO ^n n_� Signature (/dib l/'h/�IX//YfYG) _ Title Mana er Production Taxes and Royalties Alaska / // Printed Name Diane Colley Phone (907) 564-5775 Date �f' Note: All volumes must is corrected to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000030 2. Facility Name PBU FS 3 3. Field PBU - EOA 4. Operator BP 5. Monfh/Year of Disposition March -2014 Disposftion Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. sold 0 Pool Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 100.00°/ B. Flared or vented 1 hour or less 112 9. Flared or vented more than 1 hour (see instr.) 5,428 10. Pilot and Purge 16,205 11. Assisi Gas 13,007 12. Fuel gas used in lease operations. 960,627 13. Other (see instructions) 0 Official Use Only Authorization >l he Safety 2— D MCF 14. TOTAL VOLUME (ITEMS 6-12) 995,379 Lease Use MCF 15. NGL Gas Equivalent p Conservation MCF 16. Purchased gas p Waste: MCF 17. Transferred from: CGF 976,832 / z t 16. Transferred to: (Express as a negative #) CGF -27,885,098 Commissioner Date 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature l C LJ1 Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a // J' I temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date /'-j' AAC25.235. vz- 413/ 1 v Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate DATE less than or equal to 1 TOTAL BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT- FS -3 GAS FLARING INCIDENT REPORT March 2014 DESCRIPTION OF INCIDENT & CAUSE Not required for unplanned events <= 1 hr I VOLUME DESCRIPTION OF IN See attachments ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events <= 1 hr ACTION TAKEN TO E See attachments Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME TOTAL 0 0 112 5,428 16,205 13,007 34,752 Page 6 4/11/2014 10:03 AM TOTAL 0 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 3/10/2014 1305-1311 3 See attachments See attachments 3/12/2014 0735-0800 109 TOTAL 112 Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 3/11/2014 0958-1605 103 See attachments See attachments 3/13/2014 0721-0830 105 3/14/2014 0712-0830 104 3/17/2014 0900-2359 4,300 3/28/2014 0851-1200 816 TOTAL 5,428 Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME TOTAL 0 0 112 5,428 16,205 13,007 34,752 Page 6 4/11/2014 10:03 AM Flare StartDate 03/01/2014 Flare End Date 03/31/2014 FS3 Flare Report Total Volume (MSCF) 5540 Report Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 14-73 Controlletl Slowdown 03/10/2014 1:05:00 pm 1:1100 pm 6 min No No Yes BP1\GARSKEH 3 Determination Cause After 4K hr inspection, started 1802, and shut clown 1801, for the last time. Action Taken 1801 Completed its blow clown and tlepressuring. 14-75 Controlled Blowdown 03/11/2014 9:58:00 am 4:05:00 pm 367 min No No Yes BP1\DONATR 103 Determination cause 13D Commonline depressured for anchor chop. is for the day. Flare valvevclosed, and Commonime repressurized. Action Taken Work complete 14-77 Controlled Blowdown 03/12/2014 7:35:00 am 8:00:00 am 25 min No No Yes BP1\WELBORD 109 Determination Cause Depressuretl 130 common line for anchor chop Action Taken Completed depressure _ -- 14-80 Controlled Blowdown 03/13/2014 7:21:00 am 8:30:00 am 69 min No No Yes BPI\WELBORD 105 Determination Cause Depressuretl 13O C/L for anchor chop Action Taken Completed depressure _ —. ---- - --- - 14-63 Controlled Blowdown 03/14/2014 7:12:00 am 8:30:00 am 78 min No No Yes BP1\WELBORD - 104 Determination Cause Depressuretl 13D common line for anchor chop Action Taken Completed depressure _ -_— ---- - 14-88 Controlled Blowdown 03/17/2014 9:00:00 am 11:59:00 pm 899 min No No Yes BP1\WELBORD 4300 Determination Cause 1802 T/C Shut clown to blind 1801 TIC Action Taken Restarted 1802 TIC - - — --- - 14-99 Controlletl Slowdown 03/28/2014 851:00 am 12:00:00 pm 189 min No No Yes BP1\DONATR 816 T/C flared STV/IP gas from IF, Separators and COSD to isolate and remove the leaky 1801 IP Antisurge BV. Determination Cause Shutdown 1802 and Action Taken Completed the work, and restarted 1802 T/C. _ - Total Volume (MSCF) 5540 Page 6 of 9 Generated 04/07/2014 10:21:34AM Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj Sent: Saturday, March 15, 2014 10:11 AM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, HSSEE Env Adv West; AK, OPS PCC EOC TL; AK, OPS FS3 OSM; AK, OPS FS3 Facility OTL; AK, OPS GC1 OSM; AK, OPS GC1 Facility OTL; AK, OPS CGF OTL; AK, OPS CCP CGF OSM; AK, HSSEE Env Adv Central; AK, HSSEE Env Adv East; AK, OPS FS1 OSM; AK, OPS FSI Facility OTL; Burgess, David H; Hauger, Wayne A Subject: Gas flaring events a0ft GC1, CGF, FS1 To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC Jennifer huntCa.alaska.gov dave robvCa7alaska.gov victoria fergusonCa.alaska.gov From: Kellie Okonek, GPB Production Optimization Team Leader A flaring event occurred at FS3 starting at 03/14/2014 07:12 and stopping at 03/14/2014 08:30 with a volume of 104 (MSCF). The event lasted for 78 minutes, and was due to additional depressure for 13D for anchor chop. A flaring event occurred at FS3 starting at 03/13/2014 07:21 and stopping at 03/13/2014 08:30 with a volume of 105 (MSCF). The event lasted for 69 minutes, and was due to additional depressure for 13D for anchor chop. A flaring event occurred at FS3 starting at 03/11/2014 09:58 and stopping at 03/11/2014 16:05 with a volume of 103 (MSCF). The event lasted for 367 minutes and was due to 13D commonline depressure for anchor chop. Flaring stopped when depressure was complete. A flaring event occurred at GC1 starting at 03/14/2014 03:30 and stopping at 03/14/2014 08:05 with a volume of 270 (MSCF). The event lasted for 275 minutes, and was due to flaring off of V-136 during gas rate swings. Flaring stopped when gas rate steaded. A flaring event occurred at GC1 starting at 03/13/2014 00:01 and stopping at 03/13/2014 23:59 with a volume of 260 (MSCF). The event lasted for 1438 minutes, and was due to flaring off of V-136 during gas rate swings. Flaring stopped when gas rate steaded. A flaring event occurred at GCI starting at 03/12/2014 18:30 and stopping at 03/12/2014 20:00 with a volume of 270 (MSCF). The event lasted for 90 minutes, and was due to swapping of GLT compressors. Flaring stopped when K3200 was online and K3300 shut down. A flaring event occurred at CGF starting at 03/10/2014 01:19 and stopping at 03/10/2014 03:08 with a volume of 387 (MSCF). The event lasted for 109 minutes, and was due to T/C 1805 shutdown due to control/instrumentation failure associated with vibration card. Flaring stopped when equipment was re -started. A flaring event occurred at FSI starting at 03/05/2014 06:31 and stopping at 03/05/2014 18:50 with a volume of 739 (MSCF). The event was a black smoke event. The event lasted for 739 minutes, and was due to 1802 s/d for planned boroscope. Flaring stopped when job was complete and compressor re -started. Please let me know if you have any questions. Kellie Okonek (alt. Travis Rybicki) PCC/EOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) Hunt, Jennifer L DVA From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj Sent: Tuesday, April 01, 2014 1:55 PM To: Hunt, Jennifer L (DOA) To: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary ; Arthur, Gregory; Burgess, David H; AK, OPS FS3 Facility OTL; AK, OPS FS3 OSM; AK, HSSEE Env Adv East Subject: Gas flaring event at FS3 To: Jennifer Hunt, AOGCC ennifer. huntgalaska.gov CC: Dave Roby, AOGCC dave robs( alaska.gov CC: Victoria Ferguson, AOGCC victoria fergusonCcilalaska.gov From: Travis Rybicki, GPB Production Optimization Team Leader A flaring event occurred at FS3 starting at 03/17/2014 09:00 and stopping at 03/17/2014 23:59 with a volume of 4300 (MSCF). The event lasted for 899 minutes. Flaring was due to planned shutdown of TIC 1802 STV/IP compressor to enable energy isolation (blinding) of the offline unit, TIC 1801 for planned project work. Flaring ended when the blinding activities were completed, TIC 1802 was restarted, loaded and the flare valves closed. Please let me know if you have any questions. Travis M. Rybicki PCC-EOC (Production Optimization) Team Lead Office 907-659-4472 (80C) 659-5566 (PBOC) C,11907 -74B-2118 Harmony 758-4404 GPB Pager 907-659-5272 # 1890 kopspcceoCtlNbp com Alternate: Kellie Okonek STATE OF ALASKA .... A� � o%rllT ^ir r2e -W irGn rA-q MSPOSITION Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Y1 -F o/zzt 114 Submit in Duplicate TOTAL 0 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - FS -3 GAS FLARING INCIDENT REPORT April 2014 DESCRIPTION OF INCIDENT as CAUbt Not required for unplanned events <= 1 hr See attachments Not required for unplanned events <=1 hr ACTION TAKEN TO t See attachments TOTAL 0 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 4/19/2014 0005-0015 240 See attachments See attachments TOTAL 240 Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 4/19/2014 0030-0230 1,473 See attachments See attachments TOTAL 1,473 Unplanned Events < 1 Hour Unplanned Events > 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME TOTAL 0 0 240 1,473 15,384 1,478 18,575 Page 5 5/15/2014 10:51 AM Flare Start Date 04/0112014 Flare End Date 04/30/2014 FS3 Flare Report Total Volume (MSCF) 11713 Report ReporSystem Date Start Time Stop Time Duration intermittent Black Smoke Planned Reported By Volume Numbs 14-128 Controlletl Blowtlown 04/1912014 12:05:00 am 12:15:00 am 10 min NO No Yes BPI\BOUWKA 240 Determination Cause T\C 1806 shutdown for planned maintenance Action Taken Completed shutdown. -- — _No Yes BPI\8OUWKA - 1473 14-128 Controlled Blowdown 04/19/2014 12:30:00 am 2:30:00 am 120 min No Determination Cause T\C 1806 spin cooling Action Taken Completed spin cooling. Total Volume (MSCF) 1713 Page 5 of 9 Generated 05/05/2014 10:32:25AM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Number 2, Facility Name 3. Field 4. Operator 5. 90000030 PBU FS 3 PBU - EOA BP Disposrtoo Volume MCF 20 For production from multiple Pools,lis[contri6 Total volume. 6. Sold 19. Remarks and Signature Printed Name my Date Pool Lease Use Use Only pool as Date Note: All volumes must be corrected to pressure of 14.65 Asia and to a temperature of 60o F. Authority 20 VI -f- Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate 0 7. Reinjected 8. Flared or vented 1 hour or less 784 9. Flared or vented more than 1 hour (see Instr.) 2,681 16,532 10. Pilot and Purge 4,945 11. Assist Gas 12. Fuel gas used in lease operations. 651,202 13. Other (see instructions) 0 14. TOTAL VOLUME (ITEMS 6-12) 676,144 0 15. NGL Gas Equivalent 0 16. Purchased gas 17. Transferred from. CGF 667,734 18. Transferred to. (Express as a negative #) CGF -24,002,260 19. Remarks and Signature Printed Name my Date Pool Lease Use Use Only pool as Date Note: All volumes must be corrected to pressure of 14.65 Asia and to a temperature of 60o F. Authority 20 VI -f- Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INN. PRUDHOE BAY UNIT- FS -3 GAS FLARING INCIDENT REPORT May 2014 DATE TIME wwnIc 5/19/2014 1700-1710 40 Not required for unplanned events <= 1 hr TOTAL 40 (planned Events greater than 1 hour VOLUME DESCRIPTIONOF INCIDENT&CAUSE DATE TIME See attachments TOTAL 0 Events Less Than or Equal 1 Hour AND 4= 5,000 n1w armed TIME VOLUME DESCRIPTION OF INC( DATE 5/15/2014 0211-0215 60 See attachments 5/15/2014 1004-1044 484 5/19/2014 2025-2035 60 5/23/2014 1655-1705 80 5/24/2014 0045-0055 60 TOTAL 744 Manned Events Exceeding 1 Hour OR > 5,000 mcf TIME VOLUME DESCRIPTION OF INS DATE 5/15/2014 0230-0430 1,150 See attachments 5/19/2014 1000-1200 868 5/21/2014 1345-1525 463 5/23/2014 1000-1255 200 TOTAL 2,681 TOTAL Unplanned Events < 1 Hour 40 Unplanned Events > 1 Hour 0 744 Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME 2,681 16,532 4,945 24,942 1=4 Not required for unplanned events <=1 hr See attachments See attachments See attachments Page 6 6112/2014 10:40 AM Flare Start Date 0510112014 Flare End Date 05/31/2014 3465 FS3 Flare Report Total Volume (MSCF) No Yes BP1\WELBORD 14-166 Controlled Blowdown 05/19/2014 1000:00 am 12:00:00 pm 120 min No Determination Cause 1804 Spinning for water wash ---- Action Taken Completed water was — - 868 --� - BP1\WELBORD 60 No Yes t 14-166 Controlled Blowdown 05/1912014 8:25:00 Pm 8:35:00 pm 10 min No Intermittent Black Smoke Planned Reported By Volume Report Date Start Time Stop Time Duration System Yes 8P1\WELBORD 60 Numbs Blowdown 0511512014 2:11.00 am 2:15:00 am 4 min No No 14-164 Controlled T\C 1804 shutdown for planned maintenance Determination Cause Completed shutdown. --- - - - - Yes BP1\WEL8ORD 1150 Action Taken Blowtlown 05/1512014 2:30:00 am 4:30:00 am 120 min No No 14-164 Controlled Determination Cause % 1804 spin cooling ------ Completed spin cooling. Yes BP1\BOUWKA 484 Action Taken �— _— Blowdown 05/15/2014 10:04:00 am 10:44:00 am 40 OnNo No 14A64 Controlled DS15 B 8 D C1L's shutdown for planned maintenance Determination Cause - --- - Action Taken Completed depmssudng. _ No Yes BP1\WELBORD 14-166 Controlled Blowdown 05/19/2014 1000:00 am 12:00:00 pm 120 min No Determination Cause 1804 Spinning for water wash ---- Action Taken Completed water was — - 868 --� - BP1\WELBORD 60 No Yes t 14-166 Controlled Blowdown 05/1912014 8:25:00 Pm 8:35:00 pm 10 min No Determination Cause TC 1803 depressured for water wash -- - - - Action Taken Completed shutdown. No Yes BP1\DONATR 463 — 1:45:00 14-168 Other 05121/2014 1:45:00 pm 3:25:00 Pm 700 min No Determination Cause 1803 T/C Spring Water wash Crank and normal Turbine Stop. - - -- - Completed the Water wash and completed a normal Stop of the Turbme�—�— - Actio nTaken --BP1\GARSKEH 200 14-172 Controlled Blowdown 05/23/2014 10:00:00 am 12:55:00 pm 175 min Yes No Yes engagment. Due to requiretl SILOPA testing. Determination Cause 1803 had 3 start attempts, one without a starter - — — - - 1803 was succesfully started and loaded. Action Taken — — — _ No Yes BP1\GARSKEH 14-173 Controlled Blowdown 05124/2014 12:45:00 am 12:55:00 am 10 min No Determination Cause Attempted start of 1804 after Required SILOPA testing. Slowdown competed 2nd attempt Action Taken _ �— Total Volume (MSCF) Generated 06103/2014 9:13:32AM 60 3465 Page 6 of 10 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Per -u [Tv RFPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 0290000030 PBU FS 3 Disposition 3. Field PBU - EOA Volume MCF 4. Operator 5. MonthNear of Disposition BP June -2014 20. For production from multiple pools, list contribution or each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent PRUDHOE 640150 100.00% 7. Reinjected 0 8. Flared or vented 1 hour or less 1,250 9. Flared or vented more than 1 hour (see inslr.) 677 10. Pilot and Purge 18,105 11. Assist Gas 2,039 12. Fuel gas used in lease operations. 802,763 Official Use Only 13. Other (see instructions) 0 Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 824,834 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF --7j /4 Com issioner Date 17. Transferred from: CGF 819,011/e, 18. Transferred to: (Express as a negative #) CGF -21,708,804 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. allies Alaska Signature � Title Manager Production Taxe7T- Note: All volumes must corrected to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Diane Colle Phone (907) 564-5775 Date Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - FS -3 GAS FLARING INCIDENT REPORT June 2014 Events less than or equal to 1 hour planned TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE DATE 240 Not required for unplanned events <= 1 hr 6/23/2014 0850-0855 6/23/2014 0910-0915 75 6/27/2014 0228-0233 240 6/27/2014 0430-0435 75 TOTAL 630 tplanned Events greater than 1 hour DESCRIPTION OF INCIDENT & CAUSE DATE TIME VOLUME See attachments TOTAL 0 tanned Events Less Than or Equal 1 Hour AND <= 5,000 mcf TIME VOLUME DESCRIPTION OF INCIDENT &CAUSE DATE 6/8/2014 1600-1610 75 See attachments 6/8/2014 1729-1739 155 6/8/2014 1808-1818 75 6/28/2014 1326-1336 240 6/28/2014 1700-1710 75 TOTAL 620 Manned Events Exceeding ' Hour OR > 5,000 mcf TIME VOLUME DESCRIPTION OF INCIDENT &CAUSE DATE 6/6/2014 1030-1430 677 See attachments TOTAL 677 TOTAL Unplanned Events < 1 Hour 630 Unplanned Events> 1 Hour 0 Planned Events < 1 hour and not 620 exceeding 5,000 MCF Planned Events> 1 hour or 677 exceeding 5,000 MCF 18,105 Pilot Purge 21039 Assist TOTAL FLARED VOLUME 22,071 4CFION TAKEN TO ELIMINATE CAUSE Not required for unplanned events <= 1 hr See attachments ACTION TAKEN TO F See attachments See attachments Page 5 7116/2014 1:45 PM Flare StartDate 06/01/2014 Flare End Date 06/30/2014 F53 Flare Report Total Volume (MSCF) +927 Report Date Stag Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume Numbs System yes BPI\BOUWKA 577 14-185 Controlled Blowdown 06/06/2014 10:30:00 am 2:30:00 Pm 240 min No No Determination Cause 1806 AL T\C system start up & shutdown due Major Overhaul work - Overspeed trips, etcthen cool downAction Taken - - Completed spin cooling. -- - ----- - Yes BPt\BOUWKA 75 14-189 Controlled Blowdown 06/08/2014 4:00:00 Pm 4:10:00 Pm 10 min No No -- Determination Cause 1806 AL T\C system startup after Major Overhaul Action Taken Completed start ups __ _------- 5:39:00 Pm ----- 14-189 Controlled Blowdown 06/06/2014 5:29:00 Pm 10 min No Determination Cause 1806 AL T\C system shutdown due l0 a problem associated with hi temp control Action Taken Completed shutdown. _— .--- ---- 14-189 Controlled Blowdown 06/08/2014 6:08:00 pm 6:18:00 pm 10 min No Determination Cause 1806 AL T\C system start up after temp Control problem fixed Action Taken Completed start up. _ .------ ---- -- --- -- Yes BPt\BOUWKA 155 No No Yes -- -- Yes - Yes BP1\BOUWKA 75 _ - No Yes 14-218 Controlled Slowdown 06/2812014 1:26:00 pm 1:36:00 Pm 10 min No ination Cause 1806 manual shutdown to trouble shoot and repair 2nd stage novel control voltage equipment. BP1\GARSKEH 240 Determ 1806 equipment tlepressured. - - - - -- -- 75 Action Taken _ -- - -----_--�- - _ No Yes BP1\GARSKEH _ _ _. _ : 10 min No _._----._ - _ 5.10:00 Pm 14-216 Other 06/28/2014 5:00:00 pm Determination Cause 1806 purge volume on start-up. Action Taken 1806 on line and loaded. Total Volume (MSCF) Generated 07/09/2014 3:12:32PM 1927 Page 4 of 7 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000030 2. Facility Name PBU FS 3 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition I July -2014 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 912 9. Flared or vented more than 1 hour (see instr.) 5,334 10. Pilot and Purge 6,394 11. Assist Gas 1,373 12. Fuel gas used in lease operations. 286,879 13. Other (see instructions) 0 Official Use Only Authorization>1 hr. Salary �� 2 MCF 14. TOTAL VOLUME (ITEMS 6-12) 300,892 Lease Use MCF 15, NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: CGF 293,059 Commissioner Date / 18. Transferred to: (Express as a negative #) CGF -8,024,484 19. Remarks: I hereby certify that t e foregoing is true and correct to the best of my knowledge. Signature Title Mana er Production Taxes and Royalties Alaska Wft Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Diane Colley Phone (907) 564-5775 Dale vL-F � 14-111 Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - FS -3 GAS FLARING INCIDENT REPORT July 2014 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT&CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr TOTAL TOTAL G I See attachments See attachments 7/9/2014 1320-1330 260 See attachments See attachments 7/10/2014 0455-0505 19 7/10/2014 1345-1415 470 7/11/2014 0230-0245 80 7/11/2014 0935-0945 3 7/11/2014 1134-1145 80 TOTAL 912 Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT&CAUSE ACTION TAKEN TO ELIMINATE CAUSE 7/11/2014 1230-1800 5,334 See attachments See attachments TOTAL 5,334 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events> 1 Hour 0 Planned Events < 1 hour and not 912 exceeding 5,000 MCF Planned Events> 1 hour or 5,334 exceeding 5,000 MCF Pilot Purge 6,394 Assist 1,373 TOTAL FLARED VOLUME 14,013 Page 6 8/14/2014 2:23 PM FlareStartDate 07/01/2014 Flare End Date 07/31/2014 FS3 Flare Report Total Volume (MSCF) 6246 Report System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume Numbs 14-234 Controlled 8lowdown 07/09/2014 1:20:00 pm 1:30:00 pm to min No No Yes BPMELBORD 260 Determination Cause 1806 AL T/C shutdown with full depressuefor TAR Action Taken Completed Shutdown 14-235 Controlled slowdown 07/10/2014 4:55:00 am 5:05:00 am 10 min No No Yes BP11WELBORD 19 Determination Cause Blew down'CIP separator for TAR Action Taken Completed blow down -- 14-235 Controlled Blowdown 07110/2014 1:45:00 pm 2:15:00 pm 30 min No No Yes BP1\WELBORD 470 Determination Cause Depressured'A' HP separator and Gas scrubber for TAR Action Taken Completed Depressure 14-240 Controlled Blowdown 07/11/2014 2:30:00 am 2:45:00 am 15 min No No Yes BP1\WELBORD 80 Determination Cause 1803 T/C shutdown/blowdown for TAR Action Taken Completed blowdown- 14-240 Controlled Blowdown 07/11/2014 9:35:00 am 9:45:00 am 10 min No No Yes BPI\WELSORD 3 Determination Cause 1802 T/C shutdown for TAR Action Taken Completed shutdown 14-240 Controlled Blowdown 07/11/2014 1134:00 am 11:45:00 am 11 min No No Yes BP1\WELBORD Determination Cause 1804 T/C shutdown/blowdown for TAR Action Taken Completed blowdown 14-240 Controlled Blowdown 07/11/2014 12:30:00 pm 6:00:00 pm 330 min No No Yes BP1\WELBORD 5334 Determination Cause Blowdown of all common lines, residue gas line, and facility vessels/piping for TAR Action Taken Completed blowdown _ — _ - Total Volume (MSCF) 6246 Generated 08/04/2014 11:24:17AM Page 7 of L From: Sent: To: Cc: Subject: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj Sunday, July 20, 2014 11:29 AM Hunt, Jennifer L (DOA) Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary OPS PCC EOC TL; AK, HSSEE Env Adv East; Burgess David ; AK, Arthur, Gregory; AK, OPS FS1 OSM; AK, OPS FS2 Facility OTL; AK, OPS FS1 Facility OTL; AK, AK, OPS GPMA Facility OTL; AK, OPS AK, OPS FS3 Facility OTL; AK, OPS FS3 OSM; GPMA OSM; Hiester, Wendy Gas flaring events at FSI, FS2,VMLPC CC: Dave Roby, AOGCC To: Jennifer Hunt, AOGCC dave robygalaska.gov Jennifer huntCa7alaska.aov From: Kellie Okonek, GPB Production Optimization Team Leader CC: Victoria Ferguson, AOGCC victoria 5rquson iaiaska.gov Afl topping at 07/10/2014 23:10 with a volume of 659 A flaring event occurred at FS1 starting at 0711012014 22:35 and sdue to high gas CCP(MSCF) compressormt had a volume problems duet greatere eve1805 shutdow000n. F (MSCF) g sand p ewas When 1805 was loadedd line pressure caused by FS2 in at 07/06/2014 04:00 with a volume of 1036 A flaring event occurred at FS2 starting at 07/06/2014 02:00 and stopping (MSCF). The event lasted for 120 minutes, and was due to depressurization of DS9 commonline for planned maintenance. 33 and stopping at 07/0912014 A flaring event occurred at FS2 starting at 0710912014 16:nline for smart pigging. with a volume of 4 (MSCF). The event lasted for 68 minutes, and was due to depressurization of DS9 commonlin A flaring event occurred at FS2 starting at 0711112014 08:32 and stopping at 0 hutdo014 due to with o volume of 75 failure associated with ed fon the fuel gas knock out drum. Flaring stopped when compressor was loaded. (MSCF). The event lasted for 152 minutes, and was due to SN -IP T\C 1802 shutdown due to control\aded mentation HHL 036 A flaring event occurred at FS2 starting at 07/13/2014 14:22 and stopping at of 9E/ 2014 16:57 with a volume of ging (MSCF). The event lasted for 155 minutes, and was due to depressurization of 9E/9A commonlines for smart pigging. FS3 2-30 stopping and was due to 5334 wn A flaring event occurred MSCF). The evvent la edtforr 330 minutes. The evat ent had a volume grreatertthaln 5000 (MSCF), and a volume of 5 of all common lines, residue gas line, and facility vesselslpiping for planned turnaround. LPCin at 06/15/2014 with a volume of 15325 (MSCF). A flaring event occurred at LPC starting at 06114/2014 20:37 and stoppingvent and was due tThe evet wets a black o 1808 event. Th re-injection compressor omp essor or 203 mishutdownnutes. Thee for fullll plant planned 000 ed shutdown (MSCF), A flaring event occurred at LPC starting at 06/15/2014 00:01 and stopping at 06/1512014 17:30 with a volume of 956 (MSCF). The event was a black smoke event. The event lasted for 1049 minutes. The event hada volume greater than 5000 (MSCF), and was due to depressurization of the residue gas line and commonlines through LPC for planned shutdown. k flaring event occurred at LPC starting at 06/2812014 18:58 and stopping at 061281 8 Reinjection pre 19:03 with a volume of 81 MSCF). The event a failus a black smoke stopped when due tosso�was repaired and rreeoaded.ssor utdown because of ;ontrol/instru Please let me know if you have any questions. Kellie Okonek (alt. Travis optimizationTL PCCIEOC Production Op external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akoosgcceoctlCa7bp com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 0290000030 PBU FS 3 Disposition 3. Field PBU - EOA Volume MCF 4. Operator 5. MonthNear of Disposition BP August -2014 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 522 9. Flared or vented more than 1 hour (see instr.) 9,205 10. Pilot and Purge 14,083 11. Assist Gas 10,902 12. Fuel gas used in lease operations. 438,377 13. Other (see instructions) 0 Official Use Only Authorization >I hr: Safety lJ MCF 14. TOTAL VOLUME (ITEMS 6-12) 473,089 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: CGF 452,460 /f /11 , ✓ l L ! Commissioner Date 18. Transferred to: (Express as a negative #) CGF -15,940,501 19. Remarks: I hereby certify that foregping is true and correct to the best of my knowledge. Signature Title Maria er Production Taxes and Ro aloes Alaska � Note: All volumes must and to teda to pressure of 14.65 psis is and to a temperature of 60o F. Authority 20 AAC25.235. Phone (907) 564-5775 Date 9 !a/9ll4' Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate 8/14/2014 1422-1434 TOTAL BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT- FS -3 GAS FLARING INCIDENT REPORT August 2014 60 Not required for unplanned events <= 1 hr 60 Not required for unplanned events <= 1 hr 8/12/2014 0300-0900 9,015 See attachments See attachments 8/12/2014 1400-1600 120 TOTAL 9,135 Planned Events Less Than or Equal 1 Hour AND <= 5,000 and DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 8/13/2014 2334-2400 242 See attachments See attachments 8/14/2014 0330-0335 80 8/14/2014 1706-1711 60 8/15/2014 1430-1435 80 TOTAL 462 Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 8/29/2014 0028-0149 70 See attachments See attachments TOTAL 70 TOTAL Unplanned Events < 1 Hour 60 Unplanned Events> 1 Hour 9,135 Planned Events < 1 hour and not 462 exceeding 5,000 MCF Planned Events > 1 hour or 70 exceeding 5,000 MCF Pilot Purge 14,083 Assist 10,902 TOTAL FLARED VOLUME 34,712 Page 6 9/15/2014 4:46 PM Flare Start Date 08/01/2014 Flare End Date 08/31/2014 FS3 Flare Report Total volume (MSCF) 9727 Repoli d BVolume Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke N tanned BPPBo WKAy A o 9015 14-297 Controlled Blowtlown 08/12/2074 3:00:00 am 9:00:00 am 360 min Yes No _. Determination Cause STV -IP T\C 1802 unloaded due to low gas rates. Attempting to increase rates Action Taken Loaded STV/IP TIC. — BP1\BOUWKA 120 14-297 Controlled Blowdown 08/12/2014 2:00:00 pm 6:00:00 pm 240 min Yes No No Determination Cause T\C 1803 after attempting 3 starts, Shutdown due to writrohinstmmentation failure, need Overhaul Crew in am Action Taken Completed Shutdown --- 14-301 Controlled Blowtlown 08/13/2014 11:34:00 pm 12:00:00 am 26 min No No Determination Cause Depressured 14BC Commonline and MI line for gas leak on MI flange behind FS3. Action Taken Completed the depressurization of the 14BC Commonline and MI line. 14-302 Controlled Slowdown 08/14/2014 3:30:00 am 3:35:00 am 5 min No Determination Cause Started 1803 after Shutdown of Plant. Action Taken Completed the startup sequence of 1803 TIC, Yes BP1\DONATR 242 No Yes BP100NATR 80 No _... Yes BP100NATR 60 14-302 Controlled Blowtimn 08/14/2014 5:06:00 pm 5:11:00 pm 5 min No Determination CaUSe 1803 was shutdown to troubleshoot the DC LO pump run issue. Action Taken Completed the Shutdown sequence of 1803 TIC. _ _ ----- 14-308 Controlled Blowdown 08/15/2014 2:30:00 pm 2:35:00 pm 5 min No No Yes BP1\DONATR 80 Determination Cause 1803 TIC Startup after DC LO Pump troubleshooting. One start Action Taken Completed the Start up sequence of 1803 TIC. 14-328 Controlled Blowdown 08/29/2014 12:28:00 am 1:49:00 am 81 min No Determination Cause Depressure 4906 NL header and part of DS14 A/L line Action Taken Completed depressuring No Yes BPI\BOUWKA 70 Total volume (MSCF) 9727 Page 7 of 10 Generated 09/09/2014 1:36:11 PM Hunt Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Sunday, August 17, 2014 8:57 PM To: Hunt, Jennifer L (DOA) Cc: Roby, DOr,Victoria Castano, Alejandra; Benson, A Arthr, Gregoryuger, De O; AKOPS GC3&PCC OSM; AK, OPS CCP CGF OSMAK, OPS CGF OTL; AK, OPS GC1 OSM; AK, OPS GC1 Facility OTL; AK, OPS FS3 OSM; AK, OPS FS3 Facility OTL Subject: Flaring Events at CGF, GC1 andiffilm To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC iennifer hunt a alaska.aov dave roby(a)alaska.clov victoria fercusonealaska oov From: Wendy Hiester, GPB Production Optimization Team Leader CGF Following advance notification to Victoria Ferguson of the AOGCC, extended flaring events occurred at CGF from August 10-16, 2014 while restarting the facility after a prolonged planned shutdown for maintenance. Flaring was permitted to continue while operations personnel attempted to restart the facility equipment. These start-up related flaring events have stopped now that the CGF shutdown is complete. 1) On 8/16/2014, flaring at CGF started at 01:30 and stopped at 06:00 with a volume of 15972 (MSCF). The event lasted for 270 minutes. 2) On 8/15/2014, flaring at CGF started at 00:01 and continued through midnight with a volume of 81383 (MSCF). The event lasted for 1439 minutes. 3) On 8/14/2014 flaring at CGF started at 02:45 and continued through midnight with a volume of 13731 (MSCF). The event lasted for 1275 minutes. 4) On 8/12/2014, flaring at CGF started at 04:30 and stopped at 05:05 with a volume of 255 (MSCF). The event, which lasted for 35 minutes, was due to shutdown of Compressor 1802 for planned maintenance. The event ended when depressurization of the compressor was complete. 5) On 08/10/2014, flaring at CGF started at 19:40 and stopped at 23:58 with a volume of 32410 (MSCF). The event, which lasted for 258 minutes, was due to depressurizing the WOA 60" line and 4938 Inlet Separator vessel for planned maintenance. The event ended when depressurization was completed. GC1 A flaring event also took place at GCI on 08/10/2014 due to the same planned maintenance on the WOA 60" line as flaring event #5 at CGF above. The IP and LP compressors flared during the required swap of production from the GC 1 Annex to the Old Plant to perform the maintenance. The flaring stopped when the gas rate to old plant was stable. The flare event at GCI started at 08/10/2014 19:51 and stopped at 08/10/2014 23:10 with a volume of 491 (MSCF). The event lasted for 199 minutes. FS3 Flaring events occurred at FS3 from August 12-14 while restarting the facility after a prolonged planned shutdown for maintenance. These flaring events have stopped now that maintenance is complete. 14 03:35 with a 1) A flare event The event last dstarting for 5 Ominutes0and was03:30anue d o ° starting the 81803 compressor. The flaring (MSC volume of 80 ) stopped when the startup sequence was complete. a volume of at 14 14:34 w in 2) A flare event at FS3 . The event lastedng at for 12 minutes and was due to depr14 14:22 and essur n/g the014D commonhline at DS14 60 ( order to when the line was depressured to a safe energy order to isolate a well slot choke. The flaring stopped state. and at 3) A flare event at FS3 starting for 5 Ominutes0and was 14 6due toYshutting down the 1803 volume of 60 1803 compressor to (MSCF). T event lasted flaring stopped when the shutdown sequence was troubleshoot the DC LO pump run issue. The complete. /13/2014 e Of 4) A flare event at FS3 The event lasted t 08 1 minutes1423:34 and and was stopping dap assuring the214BC common4:00 with a lone and MI (MSC ) MI line for a gas leak on the MI flange. The flaring stopped when the lines were depressured to a safe energy state. 5) A flare event at FS3 starting at 08/12/2014 14:00 and stopping at 08/12/2014 18:00 with a volume of 120 (MSCF). The event lasted for 240 minutes and was due to shutting down T\C 1803 after attempting 3 starts. Flaring stopped once shutdown was complete. 2014 o with a volume of at 6) A flare event aThe evenlastedat 0for13600mnuteOsOFlarng occurgred when he STV-OIP T\C 1802 unloaded due low gas increasing rates to load the STV/IP T/C. due to low gas rates. Flaring was stopped by g Please let me know if you have any questions. Wendy Hiester (alt. Kellie Okonek) pCCIEOC Production Optimization TL externaL (907) 659 4472 B / 5566 cell. (907) 227-7144 Harmony BOC) 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akoosocceoctl@ba com N :Tom: Sent: fo: :c: subject: L DOA com] AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp. Saturday, August 30, 2014 3:09 PM Hunt, Jennifer L (DOA) Ferguson, Victoria L (DOA); Roby, David S (DOA); Caster Dle 0 Alejandra; Benson, Gary Arthur, Gregory; AK, HSSEE HSSEEEnv Env Addv vVEasYKAK OPSaFS22 Facility OTL; A; AK, OPS GCIK OPS FS2OOSM; Bur Facility OTL; AK, Gas flaring events at GOCP FS23 OSM; AK, OPS FS3 Facility O TL CC: Dave Roby, AOGCC To: Jennifer Hunt, AOGCC dave� @alaska oov_ Jennifer huntC�alaska.ao� CC: Victoria Ferguson, AOGCC victoria ferouson@alaska.9ov W29/2014 09:45 From: Kellie Okonek, GPB Production Optimization Team Leader at OE A flaring event occurred at oC75s nutes,tand2wasO14 dueOto shutdownand oof GLT 3200 and depressurization on for planned a volume of 0 (MSCF). The event lasted maintenance. 87 9 in at 0812912014 16:30 with a volume of 7 The event lasted for 2 st minutes, and was due to depressurization of East side lift gas line for planned A flaring event occurred at FS2 startin at 08/2912014 00:00 and stopping (MSCF). maintenance. tanned 9 in at 0812912014 01:49 ashline for Pe of 7 The event lasted for 81 minutes, and was due to depressurization of the East side lift g A flaring event occurred at FS3 starting at 0812912014 00:28 and stopping (MSCF). maintenance. Please let me know if you have any questions. Kellie Okonek optimization TL PCC/EOC Production Op Office: (907) 659-4472 Cell: (907) 382-1370 a kops ceoctl@bp•Com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION iT.f oConoT nG Donni irm GAS DISPOSITION Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE VTC 311'?/1 Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT- FS -3 GAS FLARING INCIDENT REPORT September 2014 Unplanned Events less than or equal to 1 hour Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE '. TIME VOLUME OES.LRwpo of INCIDENT :CAUSH ; ACTION_!fAKENTOAIIMINATE CAUSE 9/27/2014 1400-1415 60 Not required for unplanned events <= 1 hr Not required for unplanned events <=1 hr 9/27/2014 1442-1455 60 Unplanned Events < 1 Hour 9/29/2014 1740-1750 60 6,303 TOTAL 180 exceeding 5,000 MCF Planned Events > 1 hour or 868 Unplanned Events greater than 1 hour Pilot Purge DATETIME VOLUME DESCRIPTIONOFrINCIDENT &-CAUSE ACT(POTAKENTOELIMINATECAUSE 9/11-12/2014 2200-1740 5,833 See attachments See attachments 9/29/2014 1500-1630 470 TOTAL 6,303 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE < TIME _. VOLUME DESCMPTION OF INCIDENT&: CAU5£ ACTION--TAKENTO1EUmINATECAUSE 9/28/2014 0040-0050 60 See attachments See attachments 9/29/2014 1900-1910 60 TOTAL 120 Page 1 10/16/2014 10:24 AM Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE .; TIME VOLUME DESCRIPTION OFMODENT&:CAUSE ACTION TAKENTOE 4.iMINAT€CASSE _ 9/28/2014 0110-0310 868 See attachments See attachments TOTAL 868 TOTAL Unplanned Events < 1 Hour 180 Unplanned Events> 1 Hour 6,303 Planned Events < 1 hour and not 120 exceeding 5,000 MCF Planned Events > 1 hour or 868 exceeding 5,000 MCF Pilot Purge 17,376 Assist 15,016 TOTAL FLARED VOLUME 39,863 Page 1 10/16/2014 10:24 AM Flare Start Date 09/01/2014 Flare End Date 09/30/2014 FS3 Flare Report Total Volume (MSCF) 7471 Report Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 14-370 Controlled Blowdown 09/11/2014 10:00:00 pm 12:00:00 am 120 min No Determination Cause STV -IP T\C 1802 unloaded due to bad gas controller. Action Taken Attempting to find problem 14-371 Controlled Blowdown 09/12/2014 1201:00 am 5:40:00 pm 1059 min No Determination Cause STV -IP T\C 1802 unloaded due to bad gas controller. Action Taken Found problem, SD 1802 @ 13:10, BOL @ 17:40 14-396 Controlled Blowdown 09/28/2014 12:40:00 am 12:50:00 am 10 min No Determination Cause -RC 1803 depressured for water wash Action Taken Completed shutdown. 14-396 Controlled Blowdown 09/28/2014 1:10:00 am 3:10:00 am 120 min No Determination Cause T\C 1803 spin cooling Action Taken Completed spin cooling. 14-398 Controlled Blowdown 09/29/2014 3:00:00 pm 4:30:00 pm 90 min No Determination Cause T\C 1803 spinning during water wash Action Taken Completed shutdown. 14-398 Controlled Blowdown 09/29/2014 7:00:00 pm 7:10:00 pm 10 min No Determination Cause T\C 1804 depressured for water wash Action Taken Completed depressuring. No No uPI rnvi No No BPI\BOUWKA 5250 No Yes BP1\BOUWKA 60 No Yes BP1\BOUWKA 868 No No BPI\BOUWKA 470 No Yes BP1\BOUWKA 60 Total Volume (MSCF) 7471 Page 6 of 10 Generated 10/02/2014 2:36:16PM From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj Sent: Tuesday, September 16, 2014 12:01 PM To: Hunt, Jennifer L (DOA) Cc: Roby, David S (DOA); Ferguson, Victoria L (DOA); CaStan0, Alejandra; Benson, Gary ; Arthur, Gregory; Burgess, David H; AK, OPS GC3&PCC OSM; L; OPS FSI OSM; M; OPS FS1 Facility OTL; AK, OPS FS2 OSM; AK, OPS FS2 Facility OTL; AK, OPS FS3 OSM; AK, OPS FS3 Facility OTL Subject: Flaring events at FS1, FS2, and FS3 CC: Dave Roby, AOGCC CC: Victoria Ferguson, To: Jennifer Hunt, AOGCC AOGCC dave rotiy@alaska aov 'ennifer hunt(c�alaska aov victoria.ferauson ct alaska.aov From: Wendy Hiester, GPB Production Optimization Team Leader In the first half of September, the following flaring events occurred at FSI, F52, and FS3 9/14 FSI A flaring event occurred at FSI starting at 09/14/2014 00:00 and stopping at 09/14/2014 01:30 with a volume of 10 65 (MSCF). The event lasted for 90 minutes. Mines for 12-C pig launcher and receiver installation. Flaring Flaring occurred due to depressuring of the DS12 commo stopped when depressuring was completed. 9/8 FS2at 09/08/2014 21:04 with a volume of 1190 A flaring event occurred at FS2 starting at 09/08/201414:24 and stopping (MSCF). The event lasted for 400 minutes. Flaring occurred when the 1801 compressor was shut down to adjust the inlet gas valves. Flaring stopped when the compressor was restarted. 9/6 FS2 A flaring event occurred at FS2 starting at 09/06/2014 00:00 and stopping at 09/06/2014 21:58 with a volume of 37 77 (MSCF). The event lasted for 181laring to minimum rates to redu occurred m$e tarinpressor shut down due to high gas generator exhaust temperature. FS2 reduced 9/5 FS2 A flaring event occurred at F52 starting at 09/05/2014 00:00 and continuing to 9/6/2014 with a volume of 4127 (MSCF). enerator The event lasted for 1440 minutes. Flaring occurred when the 1801 compressor shut down due to high gas g exhaust temperature. FS2 reduced to minimum rates to reduce flaring. 9/4 FS2 A flaring event occurred at FS2 starting at 09/04/2014 13:11 and continuing to 09/05/2014 with a volume of 198 generator (MSCF). temperature9 FS2 reducee event lasted for 64minutes. laring occurred when te d to minimum rates toned uDe flaring.lressor shut down due to high gas 9/1 FS2 A flaring event occurred at FS2 starting at 09/01/2014 08:30 and stopping at 09/01/2014 11:30 with a volume of 56 (MSCF). The event lasted for 180 minutes. Flaring occurred due to depressuring the 9A common line shutdown for planned maintenance. Flaring stopped when depressuring was completed. 9/12 FS3 A flaring event occurred at FS3 starting at 09/12/2014 00:01 and stopping at 09/12/201417:40 with a volume of 525 (MSCF). The event lasted for 1059 minutes. The flaring occurred when STV -IP compressor 1802 unloaded due to a bad gas controller. The problem was found, the 1802 compressor was shut down at 13:10, and the flaring stopped when the compressor was restarted. 9/11 FS3 application has reported a flare event (ID 8420) at F53 starting at 09/11/2014 A flaring event occurred at The flare web app The event lasted for 120 minutes. The problem was 22:00 and continued into 09/12/2014 with a volume of 583 (MSCF). or was shut down, and the flaring stopped when the compressor was restarted. found on 9/12/2014, the 1802 compress Please let me know if you have any questions. Wendy Hiester (alt. Kellie Okonek) PCCIEOC Production optimization TL external: (907) 659 4472 (BOC)15566 (PBOC) cell: (907) 227-7144 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mailo- e____ °ctlPbP c°m Hunt, Jennifer L DOA From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj Sent: Thursday, October 16, 2014 9:53 AM To: Hunt, Jennifer L (DOA) Dn Gary A; Cc: Gregory; ViAKf IHSSEEOEn Adv West; Kruger, Dale a0; AK, OPS GC1 OSM; AK, OPS GCI Arthur, Facility OTL; HSSEEauger, Wayne A; Burgess, David H; AK, OPS FS1 OSM; AK, OPS FS1 Facility OKLOPS GPMA Facility v East, K CPS LoaderGPMA OSM; AK, OPS PCC OEOC TL OPS FS3 OSM; Subject: Gas flaring events at GC1, FS1, FS3, LPC CC: Dave Roby, AOGCC CC. Victoria Ferguson, AOGCC To: Jennifer Hunt, asks 0 r„h„@aaska.gov victoria.fergusonCc lalaska.gov Jennifer huntCc�alaska.gov From: Kellie Okonek, GPB Production Optimization Team Leader 15/2014 h a volume of ng A flaring event MSCF). The eoenturred at FS1 starting had a volume greatertthan 5000 (MSCF)aand was115/2014 02:17 nd t f arriingOfor the field toff e CGF bo ster833 A flaring event at FS1 starting at 1011012014 16:50 and stopping at 1011012of 71254 (MS shutdown. 014 17:50 with a volume d The event had a volume greater than 5000 (MSCF), and was due to shutdown/depressure of 126 commonline for planne maintenance. in at 10104/2014 15:45 with a volume of 378 (MSCF). The A flaring event at FS1 starting at 1010412014 14:00 and stopping event lasted for 105 minutes, and was due to LPS T/C 1804 crank spin for planned waterwash. A flaring event at FSI starting at 10/0212014 15:50 and stopping at 10/02/2014 17:45 with a volume of 878 (MSCF). The s due to LPS T/C 1804 spin cooling for planned waterwash. event lasted for 115 minutes, and wa A flaring event at FSI starting at 10102/2014 08:35 and stopping at 10/0212014 10:20 with a volume of 583 (MSCF). The event lasted for 105 minutes, and was due to LPS T/C 1803 crank spin for planned waterwash. event lasted foA flaring event r minutes. starting at10/0112014 was 1201 t LPS TIC 1803 aoppsp9 cooat ling for Plannned waterwash. 14 03:15 with a me of 1120 (MSCF). The A flaring event at LPC starting at 10/14/2014 00:00 and stopping at 10114/2014 12:16 with a volume of 5170 0 (MSC. The event was a black smoke event. The event lasted for 736 minutes. The event had a volume greater than 5000 (MSCF), event at 10/14/2014 with a volume of 4208 (MSCF). and was due to depressurization for RGI (residue gas injection) line for planned maintenance. A flaring event at LPC starting at 10/13/2014 21:32 and stopping or was a black smoke event. The event lasted for 148 minutes, and was due to depressurization of the 24" commonline planned maintenance. in at 10113/2014 20:33 with a volume of 214 (MSCF). The A flaring event at LPC starting at 10/13/2014 20:29 and stopping event was a black smoke event, and was due to 1807 injection compressor sld and depressure for RGI maintenance. A flaring event at GCI starting at 10/06/2014 01:19 and stopping at 10/06/2014 10:02 with a volume of 406 (MSCF). The at 10/05/plan 03:32 with a volume of 1650 (MSCF). The event lasted for 523 minutes, and was due to depressurization of G-44 for planned maintenance in activities. A flaring event at 27 starting at 10as du 14 depressurization and zatiostopping event lasted for 127 minutes, and was due to depressurization of PM2 LDF in support of planned pigging A flaring event at GC1 starting at 10/03/2014 08:00 and stopping at 10/03/2014 16:00 with a volume of 1820 (MSCF). The event lasted for 480 minutes, and was due to depressurization of PM2 LDF in support of planned pigging activities. Theties. A flaring event at GC1 starting at 09/29/2014 00:10 and stopping at 09129/2014 03:00 with a volume of 560 (M 0 n event lasted for 170 minutes, and was due to high transit gas pressuree Hari 014 18:30 with a volume of 290 (MSCF). The flaring in activities. A flaring event at GC1 starting at 09/28/2014 14:20 and stopp 9 at event lasted for 250 minutes, and was due to depressurization of PM2 LDF in support of planned pigging A flaring event at FS3 starting at 10/01/2014 15:35 and stopping at 10101/2014 17:15 with a volume of 405 (MSCF). The event lasted for 100 minutes, and was due to LPS T/C 1804 spin cooling for planned waterwash. A flaring event at FS3 starting at 09/29/2014 15:00 and stopping at 09/29/2014 16:30 with a volume of 470 (MSCF). The event lasted for 90 minutes, LPS T/C 1803 crank spin for planned waterwash.with a 0 am event lasted A flaring event minutes, tainat and w/28/ 0e 4 o1:1 T/C 1803 stopping n cooling for pla0nned waterwash me of 868 (MSCF). The 1 ng at 2014 03:10 with a 0 and stoPP event lasted foA flaring eventra120 minuteins, and ttd w/as due to 1:1 TIC 1803 d'epressur zation for wa erwashvolume of 60 (MSCF). The Please let me know if you have any questions. Kellie Okonek PCC/EOC Production Optimization TL Office: (907) 659-4472 Cell: (907) 382-1370 Amp �aoctlPbo.com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION DECEIVED NOV 18 2014 AOGCC 1. Facility Number 2. Facility Name 0290000030 PBU FS 3 Disposition 3. Field PBU - EOA Volume MCF 4. Operator 5. MonthNear of Disposition BP October -2014 20. For production from multiple pools, list contribution bleach pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 100.00 8. Flared or vented 1 hour or less 360 9. Flared or vented more than 1 hour (see instr.) 1,609 10. Pilot and Purge 17,932 11. Assist Gas 2,803 12. Fuel gas used in lease operations. 942,750 Official Use Only 13. Other (see instructions) 0 Authorization >l hr: Safety �(P Q y MCF 14. TOTAL VOLUME (ITEMS 6-12) 965,454 Lease Use MCF 15, NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF /_2 Commissioner 7�-�*�`� Dale 17. Transferred from: CGF 960,682 18. Transferred to: (Express as a negative #) CGF -24,622,710 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. ccdll/kkk/..h Title Mana er Production Taxes and Royalties Alaska Signature COW Printed Name Diane Colley Phone (907) 564-5775 Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235. V7-I— t a16I J14 Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - FS -3 GAS FLARING INCIDENT REPORT October 2014 DATE nmc _ _- 10/1/2014 2203-2213 60 Not required for unplanned events <=1 hr 10/2/2014 0001-0011 60 TOTAL 120 Not required for unplanned events <=1 hr DATE TIME VOLUME DESCRIPTION OF INCIDENT ax t,NU>c See attachments 10/1/2014 1535-1715 405 See attachments 10/15/2014 1502-1632 403 TnTAL 808 nMliiA1VED NOV 18 2014 10/20/2014 0910-0920 240 See attachments TOTAL 240 Manned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INI 10/27/2014 0750-1400 186 See attachments 10/28/2014 0845-1000 615 TOTAL 801 TOTAL Unplanned Events < 1 Hour 120 Unplanned Events > 1 Hour 808 Planned Events < 1 hour and not 240 exceeding 5,000 MCF Planned Events> 1 hour or 801 exceeding 5,000 MCF Pilot Purge 17,932 Assist 2,803 TOTAL FLARED VOLUME 22.704 K9 See attachments 1 111 312 01 4 2:39 PM Flare Start Date 10/0112014 Flare End Date 1 013 112 01 4 RECEIVED NOV 18 2014 FS3 Flare Report ReportDate Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume Numbs System No No Bpl\BOUWKA 405 14-399 Controlled Slowdown 10/0112014 3:35:00 pm 5:15:00 pm 100 min No - Determination Cause T\C 1804 spinning for water wash Action Taken Completed water wash---- -- Total Volume (MSCF) 1969 14-024 Controlled Blowdown 10/15/2014 3:02:00 pm 4:32:00 pm 90 min No No Determination Cause 1802 Shutdown due to IP21 wntrol issues. 3 start attempts also and one shutdown. No BP1\DONATR 403 - Completed shutdown and restart the -- - Action Taken ---- ---"--------------- -- -- -- -- 14-433 Controlled Blowdown 10/20/2014 9:10:00 am 9:20:00 am 10 min No No Determination Cause 1806 TIC normal stop to conduct CASIS Testing on the machine. Yes BPI\DONATR 240 - Action Taken Completed the shutdown sequence_ _ .__ -_ ------ - - --- -- - - - -- -� _- 14-046 Controlled Slowdown 10/27/2014 7:50:00 am 2:00:00 pm 370 min No No BPt\BOUWKA 186 Yes -- Determination Cause Depressuring of OS13 CIL Din prep for line work Action Taken Completed depressudng. - 14-050 Controlled Blowdown 10/2812014 8:45:00 am 10:00:00 am 75 min No No Yes BP1\BOUWKA 815 -- Determination Cause T\C 1802 shutdown for maintenance, flared IP/STV Action Taken Completed maintenance_ Total Volume (MSCF) 1969 Page 7 of 10 Generated 1111712014 9:25:27AM Hunt, Jennifer L (DOA From: AK, OPS PCC EOC TL (AKOPSPCCEOCTL@bp.com] Sent: Thursday, October 16, 2014 9:53 AM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; Kruger, Dale O; AK, OPS GC1 OSM; AK, OPS GC1 Facility OTL; Hauger, Wayne A; Burgess, David H; AK, OPS FSI OSM; AK, OPS FSI Facility OTL; AK, HSSEE Env Adv East; Loader, Neil; AK, OPS FS3 Facility OTL; AK, OPS FS3 OSM; AK, OPS GPMA Facility OTL; AK, OPS GPMA OSM; AK, OPS PCC EOC TL Subject: Gas flaring events at GC1, FS110 LPC To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC iennifer hunte.alaska.gov dave robv@alaska.gov victoria ferguson(c alaska gov From: Kellie Okonek, GPB Production Optimization Team Leader A flaring event occurred at FSI starting at 15/2014 02:17 nd stopping /15/2014 02:56 th a volume of (MSCF). The event had a volume greater than 5000 (MSCF), ! riO and was"flaring for the field" due d a othe CGF b oster833 shutdown. A flaring event at FS1 starting at 10/10/2014 16:50 and stopping at 10/1012014 17:50 with a volume of 71254 (MSCF). The event had a volume greater than 5000 (MSCF), and was due to shutdown/depressure of 12B commonline for planned maintenance. A flaring event at FS1 starting at 10/04/2014 14:00 and stopping at 10/04/2014 15:45 with a volume of 378 (MSCF). The event lasted for 105 minutes, and was due to LPS T/C 1804 crank spin for planned waterwash. A flaring event at FSI starting at 10/02/2014 15:50 and stopping at 10/02/2014 17:45 with a volume of 878 (MSCF). The event lasted for 115 minutes, and was due to LPS T/C 1804 spin cooling for planned waterwash. A flaring event at FS1 starting at 10/02/2014 08:35 and stopping at 10/02/2014 10:20 with a volume of 583 (MSCF). The event lasted for 105 minutes, and was due to LPS T/C 1803 crank spin for planned waterwash. A flaring event at FS1 starting at 10/01/2014 00:45 and stopping at 10/01/2014 03:15 with a volume of 1120 (MSCF). The event lasted for 150 minutes, and was due to LPS T/C 1803 spin cooling for planned waterwash. A flaring event at LPC starting at 10/14/2014 00:00 and stopping at 10/1412014 12:16 with a volume of 5170 (MSCF). The event was a black smoke event. The event lasted for 736 minutes. The event had a volume greater than 5000 (MSCF), and was due to depressurization for RGI (residue gas injection) line for planned maintenance. A flaring event at LPC starting at 10/13/2014 21:32 and stopping at 10/14/2014 with a volume of 4208 (MSCF). The event was a black smoke event. The event lasted for 148 minutes, and was due to depressurization of the 24" commonline for planned maintenance. A flaring event at LPC starting at 10113/2014 20:29 and stopping at 10/13/2014 20:33 with a volume of 214 (MSCF). The event was a black smoke event, and was due to 1807 injection compressor s/d and depressure for RGI maintenance. A flaring event at GC1 starting at 10/06/2014 01:19 and stopping at 10/06/2014 10:02 with a volume of 406 (MSCF). The event lasted for 523 minutes, and was due to depressurization of G-44 for planned maintenance. A flaring event at GC1 starting at 10/05/2014 01:25 and stopping at 10105/2014 03:32 with a volume of 1650 (MSCF). The event lasted for 127 minutes, and was due to depressurization of PM2 LDF in support of planned pigging activities. A flaring event at GC1 starting at 10/03/2014 08:00 and stopping at 10/03/2014 16:00 with a volume of 1820 (MSCF). The event lasted for 480 minutes, and was due to depressurization of PM2 LDF in support of planned pigging activities. A flaring event at GC1 starting at 09129/2014 00:10 and stopping at 09/29/2014 03:00 with a volume of 560 (MSCF). The event lasted for 170 minutes, and was due to high transit gas pressure flaring. A flaring event at GCI starting at 09/28/2014 14:20 and stopping at 09/28/2014 18:30 with a volume of 290 (MSCF). The event lasted for 250 minutes, and was due to depressurization of PM2 LDF in support of planned pigging activities. A flaring event at FS3 starting at 10/01/2014 15:35 and stopping at 10/01/2014 17:15 with a volume of 405 (MSCF). The event lasted for 100 minutes, and was due to LPS T/C 1804 spin cooling for planned waterwash. A flaring event at FS3 starting at 09/29/2014 15:00 and stopping at 09/29/2014 16:30 with a volume of 470 (MSCF). The event lasted for 90 minutes, LPS T/C 1803 crank spin for planned waterwash. A flaring event at FS3 starting at 09/28/2014 01:10 and stopping at 09/28/2014 03:10 with a volume of 868 (MSCF). The event lasted for 120 minutes, and was due to LPS T/C 1803 spin cooling for planned waterwash A flaring event at FS3 starting at 09/28/2014 01:10 and stopping at 09/28/2014 03:10 with a volume of 60 (MSCF). The event lasted for 120 minutes, and was due to LPS T/C 1803 depressurization for waterwash. Please let me know if you have any questions. Kellie Okonek PCC/EOC Production Optimization TL office: (907) 659-4472 Cell: (907) 382-1370 akoosacceoctl bo.com Hunt, Jennifer L (DOA From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj Sent: Sunday, October 19, 2014 8:59 AM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; Kruger, Dale O; Hauger, Wayne A; Burgess, David H; AK, HSSEE Env Adv East; Loader, Neil; AK, OPS FS3 Facility OTL; AK, OPS FS3 OSM; AK, OPS GC3 Facility & Field OTL' OPS GC3&PCC OSM; AK, OPS PCC EOC TL Subject: Gas flaring events at GC3 To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC iennifer hunt(a)alaska.00v dave.robv@alaska.gov victoria ferouson(dalaska aov From: Kellie Okonek, GPB Production Optimization Team Leader A flaring event occurred at GC3 starting at 10/18/2014 14:13 and stopping at 10/18/2014 23:40 with a volume of 1260 (MSCF). The event lasted for 567 minutes, and was due to spin cooling of K-7001 LPS compressor for water washing and planned maintenance. A flaring event occurred at GC3 starting at 10/17/2014 15:30 and stopping at 10/17/2014 16:58 with a volume of 56833 (MSCF). The event lasted for 88 minutes. The event had a volume greater than 5000 (MSCF), and was due to depressurization of X -pad for planned maintenance. A flaring event occurred at GC3 starting at 10/16/2014 16:00 and stopping at 10/16/2014 22:58 with a volume of 1140 (MSCF). The event was a black smoke event. The event lasted for 418 minutes, and was due to spin cooling of K-7000 LPS compressor for water wash. A flaring event occurred t FS3 starting at 115/2014 of 415 (MSCF). The event lasted forr 90 minutes, lanndwas 0 due o1802 S2 and STV//lP turbine 0 l rbi eshu dn o due to IP 21 con6:32 with atrtrol issues. Flaring stopped when machine re -started. Please let me know if you have any questions. Kellie Okonek PCC/EOC Production Optimization TL Office: (907) 659-4472 Cell: (907) 382-1370 akopspcceoctl@bo.com Hunt, Jennifer L (DOA From: AK, OPS PCC EOC TL (AKOPSPCCEOCTL@bp.comj Sent: Tuesday, October 28, 2014 9:48 AM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Loader, Neil; AK, HSSEE Env Adv East; AK, OPS FS3 OSM; AK, OPS FS3 Facility OTL; AK, OPS PCC EOC TL Subject: Gas flaring events akff§ -� CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC To: Jennifer Hunt, AOGCC dave.robv@alaska.gov victoria fergusonCa)alaska.gov iennifer huntCa�alaska.gov From: Kellie Okonek, GPB Production Optimization Team Leader at 14 0 with a volume (A flaring event occurred MSCF). The event lastedtfor 370 minutes at 1and 7was du/2014 e to depr:50 and essurization of 13D aommonliine for planned of 186 maintenance. Please let me know if you have any questions. Kellie Okonek PCC/EOC Production Optimization TL Office: (907) 659-4472 Cell: (907) 382-1370 akopspcceoctl(@bp.com REUM" `w DEC 16 2014 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSIONCGOC r...11 iT./ ocono r rnC panni IrFn GAS DISPOSITION Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate Jennifer L From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Saturday, November 15, 2014 7:33 AM Sent: Hunt, Jennifer L (DOA) To: Loepp,, Gregory; AK, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Cc ArthurHSSEE Env Adv East; AK, OPS PGC EOC TL dm Subject: Gas flaring events at FS1, LPC, an To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, victoria ferouson(@alaska a AOGCC a.,,,= roh���alaska.00v iennifer huntealaska.gOv ov From: Wendy Hiester, GPB Production Optimization Team Leader occre1/2014 stopp ng at 11/11/2014 14:30 with a volume A flaring evenThe evtlast lasted 0 minutes, ll0 starting at and wasdueto as mokeldetection trip of the 802 compressor. of 205 (MSCF) en Flaring stopped when the compressor was restarted. Flaring events during restart of LPC following maintenance outage: A flSCF).ing at The event lasted for 222 minutes a d was due to 14 00:53 and process upset/me of while starting the plant 5 (M Flaring stopped when the process was adjusted as needed. ing at ng at 14 4:56 with a A flaring event at LPC event lasted for 18/minutes and 14 wasndueoto STV/IP compressor orshutdo n on low of 137 ( ) suction pressure while starting the plant. Flaring stopped when the STV/IP compressor was restarted. volume v A flaring event at LPC starting at 10/28/2014 04:49 and stopping at 10/28/2014 d by 05:21 with a volume of 254 minutes and was due to rocess upset cause entering he plant. Flaring stopped when the plant process was adjusted as needed. a a fluid slug volume of 14 08:45 stopping at 10/28/2014 10:00 with F). The event lasted for g75 minutes and nd was duet (event at FS3 at o shutdown of the 1802 compressor for unplanned 5 (MSC ) maintenance. Flaring stopped when maintenance was completed. Please let me know if you have any questions. Wendy Hiester (alt. Kellie Okonek) PCC/EOC Production Optimization TL extecell:r(907) 227-7144 Har59 4472mony / 5566 60C) 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akoosocceoctlPbo.com p Pi a..® W. . s— JAN 16 2015 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION AOGCC __..__. - ......., r.r!!. rkonn, irr-n rA-q nISPOSITION Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate or [AYWRAIIUN (AI bJ ) INL. PRUDHOE BAY UNIT - FS -3 GAS FLARING INCIDENT REPORT December 2014 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 12/5/2014 2135-2145 260 Not required for unplanned events <=1 hr Not required for unplanned events <= 1 hr 12/15/2014 0426-0452 189 TOTAL 449 See attachments See attachments TOTAL 0 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 12/5/2014 0800-0810 3 See attachments See attachments 12/6/2014 1235-1245 3 12/16/2014 0947-1007 9,167 12/19/2014 0838-0915 182 TOTAL 9,355 Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 12/5/2014 0745-2110 3,755 See attachments See attachments 12/9/2014 1235-1400 415 TOTAL 4,170 TOTAL Unplanned Events < 1 Hour 449 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 9,355 exceeding 5,000 MCF Planned Events> 1 hour or 4,170 exceeding 5,000 MCF Pilot Purge 19,045 Assist 11,025. TOTAL FLARED VOLUME 44,044 Page 5 1/14/2015 10:49 AM