HomeMy WebLinkAboutPBU FS 3 Gas DispositionState of Alaska AOGC C
Gas Disposition Files
Year: 2014
Facility: PBU FS 3
Operator: BP EXPLORATION (ALASKA)
STATE OF ALASKA
.T`ALASKA ' %m -r f%cAoonn irGn rosln[SPOSITION
Form 10-422 Rev. 5/2009
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
llAii 1rV OCOnOT nF rmnnuCFn GAS DISPOSITION
1. Facility Number 2. Facility Name
0290000030 PBU FS 3
Disposition
3. Field
PBU - EOA
Volume MCF
-
4. Operator 5. Month/Year of Disposition
BP Februa -2014
20. For production from multiple pools, list contribution of each pool as a per o/
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
PRUDHOE 640150 100.00
7. Reinjected
0
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
14,895
11. Assist Gas
11
12. Fuel gas used in lease operations.
914,022
Official UsUMCF
13. Other (see instructions)
0
Authorization >l he
Safety
14. TOTAL VOLUME (ITEMS 6-12)
928,928
Lease Use
15. NGL Gas Equivalent
0
Conservation
16. Purchased gas
0
Commissioner Date
17. Transferred from: CGF
928,917
18. Transferred to: (Express as a negative #) CGF
-25,943,080
19. Remarks. .
I hereby certify that the foregoing is true and correct to the best of my knowledge.
n NO ^n n_�
Signature (/dib l/'h/�IX//YfYG) _ Title Mana er Production Taxes and Royalties Alaska
/ //
Printed Name Diane Colley Phone (907) 564-5775 Date �f'
Note: All volumes must is corrected
to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
AAC25.235.
Form 10-422 Rev. 5/2009
INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000030
2. Facility Name
PBU FS 3
3. Field
PBU - EOA
4. Operator
BP
5. Monfh/Year of Disposition
March -2014
Disposftion
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00°/
B. Flared or vented 1 hour or less
112
9. Flared or vented more than 1 hour (see instr.)
5,428
10. Pilot and Purge
16,205
11. Assisi Gas
13,007
12. Fuel gas used in lease operations.
960,627
13. Other (see instructions)
0
Official Use Only
Authorization >l he
Safety
2— D
MCF
14. TOTAL VOLUME (ITEMS 6-12)
995,379
Lease Use
MCF
15. NGL Gas Equivalent
p
Conservation
MCF
16. Purchased gas
p
Waste:
MCF
17. Transferred from: CGF
976,832
/ z t
16. Transferred to: (Express as a negative #) CGF
-27,885,098
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature l C LJ1 Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
// J' I temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date /'-j' AAC25.235.
vz-
413/ 1 v
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
DATE
less than or equal to 1
TOTAL
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -3
GAS FLARING INCIDENT REPORT
March 2014
DESCRIPTION OF INCIDENT & CAUSE
Not required for unplanned events <= 1 hr
I
VOLUME DESCRIPTION OF IN
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr
ACTION TAKEN TO E
See attachments
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
TOTAL
0
0
112
5,428
16,205
13,007
34,752
Page 6
4/11/2014
10:03 AM
TOTAL
0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
3/10/2014
1305-1311
3 See attachments
See attachments
3/12/2014
0735-0800
109
TOTAL
112
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
3/11/2014
0958-1605
103 See attachments
See attachments
3/13/2014
0721-0830
105
3/14/2014
0712-0830
104
3/17/2014
0900-2359
4,300
3/28/2014
0851-1200
816
TOTAL
5,428
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
TOTAL
0
0
112
5,428
16,205
13,007
34,752
Page 6
4/11/2014
10:03 AM
Flare StartDate 03/01/2014
Flare End Date 03/31/2014
FS3 Flare Report
Total Volume (MSCF)
5540
Report
Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke
Planned Reported By Volume
14-73 Controlletl Slowdown 03/10/2014 1:05:00 pm 1:1100 pm 6 min No No
Yes BP1\GARSKEH
3
Determination Cause After 4K hr inspection, started 1802, and shut clown 1801, for the last time.
Action Taken 1801 Completed its blow clown and tlepressuring.
14-75 Controlled Blowdown 03/11/2014 9:58:00 am 4:05:00 pm 367 min No No
Yes BP1\DONATR
103
Determination cause 13D Commonline depressured for anchor chop.
is for the day. Flare valvevclosed, and Commonime repressurized.
Action Taken Work complete
14-77 Controlled Blowdown 03/12/2014 7:35:00 am 8:00:00 am 25 min No No
Yes BP1\WELBORD
109
Determination Cause Depressuretl 130 common line for anchor chop
Action Taken Completed depressure
_ --
14-80 Controlled Blowdown 03/13/2014 7:21:00 am 8:30:00 am 69 min No No
Yes BPI\WELBORD
105
Determination Cause Depressuretl 13O C/L for anchor chop
Action Taken Completed depressure _
—. ----
- --- -
14-63 Controlled Blowdown 03/14/2014 7:12:00 am 8:30:00 am 78 min No No
Yes BP1\WELBORD
-
104
Determination Cause Depressuretl 13D common line for anchor chop
Action Taken Completed depressure _
-_— ----
-
14-88 Controlled Blowdown 03/17/2014 9:00:00 am 11:59:00 pm 899 min No No
Yes BP1\WELBORD
4300
Determination Cause 1802 T/C Shut clown to blind 1801 TIC
Action Taken Restarted 1802 TIC
- - — ---
-
14-99 Controlletl Slowdown 03/28/2014 851:00 am 12:00:00 pm 189 min No No
Yes BP1\DONATR
816
T/C flared STV/IP gas from IF, Separators and COSD to isolate and remove the leaky 1801 IP Antisurge BV.
Determination Cause Shutdown 1802 and
Action Taken Completed the work, and restarted 1802 T/C.
_
-
Total Volume (MSCF)
5540
Page 6 of 9
Generated 04/07/2014 10:21:34AM
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj
Sent: Saturday, March 15, 2014 10:11 AM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; Kruger, Dale O; AK, HSSEE Env Adv West; AK, OPS PCC EOC TL; AK,
OPS FS3 OSM; AK, OPS FS3 Facility OTL; AK, OPS GC1 OSM; AK, OPS GC1 Facility OTL;
AK, OPS CGF OTL; AK, OPS CCP CGF OSM; AK, HSSEE Env Adv Central; AK, HSSEE Env
Adv East; AK, OPS FS1 OSM; AK, OPS FSI Facility OTL; Burgess, David H; Hauger, Wayne
A
Subject: Gas flaring events a0ft GC1, CGF, FS1
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
Jennifer huntCa.alaska.gov dave robvCa7alaska.gov victoria fergusonCa.alaska.gov
From: Kellie Okonek, GPB Production Optimization Team Leader
A flaring event occurred at FS3 starting at 03/14/2014 07:12 and stopping at 03/14/2014 08:30 with a volume of 104
(MSCF). The event lasted for 78 minutes, and was due to additional depressure for 13D for anchor chop.
A flaring event occurred at FS3 starting at 03/13/2014 07:21 and stopping at 03/13/2014 08:30 with a volume of 105
(MSCF). The event lasted for 69 minutes, and was due to additional depressure for 13D for anchor chop.
A flaring event occurred at FS3 starting at 03/11/2014 09:58 and stopping at 03/11/2014 16:05 with a volume of 103
(MSCF). The event lasted for 367 minutes and was due to 13D commonline depressure for anchor chop. Flaring stopped
when depressure was complete.
A flaring event occurred at GC1 starting at 03/14/2014 03:30 and stopping at 03/14/2014 08:05 with a volume of 270
(MSCF). The event lasted for 275 minutes, and was due to flaring off of V-136 during gas rate swings. Flaring stopped
when gas rate steaded.
A flaring event occurred at GC1 starting at 03/13/2014 00:01 and stopping at 03/13/2014 23:59 with a volume of 260
(MSCF). The event lasted for 1438 minutes, and was due to flaring off of V-136 during gas rate swings. Flaring stopped
when gas rate steaded.
A flaring event occurred at GCI starting at 03/12/2014 18:30 and stopping at 03/12/2014 20:00 with a volume of 270
(MSCF). The event lasted for 90 minutes, and was due to swapping of GLT compressors. Flaring stopped when K3200
was online and K3300 shut down.
A flaring event occurred at CGF starting at 03/10/2014 01:19 and stopping at 03/10/2014 03:08 with a volume of 387
(MSCF). The event lasted for 109 minutes, and was due to T/C 1805 shutdown due to control/instrumentation failure
associated with vibration card. Flaring stopped when equipment was re -started.
A flaring event occurred at FSI starting at 03/05/2014 06:31 and stopping at 03/05/2014 18:50 with a volume of 739
(MSCF). The event was a black smoke event. The event lasted for 739 minutes, and was due to 1802 s/d for planned
boroscope. Flaring stopped when job was complete and compressor re -started.
Please let me know if you have any questions.
Kellie Okonek (alt. Travis Rybicki)
PCC/EOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
Hunt, Jennifer L DVA
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj
Sent: Tuesday, April 01, 2014 1:55 PM
To: Hunt, Jennifer L (DOA)
To: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary ;
Arthur, Gregory; Burgess, David H; AK, OPS FS3 Facility OTL; AK, OPS FS3 OSM; AK,
HSSEE Env Adv East
Subject: Gas flaring event at FS3
To: Jennifer Hunt, AOGCC
ennifer. huntgalaska.gov
CC: Dave Roby, AOGCC
dave robs( alaska.gov
CC: Victoria Ferguson, AOGCC
victoria fergusonCcilalaska.gov
From: Travis Rybicki, GPB Production Optimization Team Leader
A flaring event occurred at FS3 starting at 03/17/2014 09:00 and stopping at 03/17/2014 23:59 with a volume of 4300
(MSCF). The event lasted for 899 minutes. Flaring was due to planned shutdown of TIC 1802 STV/IP compressor to
enable energy isolation (blinding) of the offline unit, TIC 1801 for planned project work. Flaring ended when the blinding
activities were completed, TIC 1802 was restarted, loaded and the flare valves closed.
Please let me know if you have any questions.
Travis M. Rybicki
PCC-EOC (Production Optimization) Team Lead
Office 907-659-4472 (80C) 659-5566 (PBOC)
C,11907 -74B-2118 Harmony 758-4404
GPB Pager 907-659-5272 # 1890
kopspcceoCtlNbp com
Alternate: Kellie Okonek
STATE OF ALASKA
.... A�
� o%rllT ^ir r2e -W irGn rA-q MSPOSITION
Form 10-422 Rev. 5/2009
INSTRUCTIONS ON REVERSE SIDE
Y1 -F
o/zzt 114
Submit in Duplicate
TOTAL
0
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -3
GAS FLARING INCIDENT REPORT
April 2014
DESCRIPTION OF INCIDENT as CAUbt
Not required for unplanned events <= 1 hr
See attachments
Not required for unplanned events <=1 hr
ACTION TAKEN TO t
See attachments
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
4/19/2014 0005-0015 240 See attachments
See attachments
TOTAL 240
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
4/19/2014 0030-0230 1,473 See attachments
See attachments
TOTAL 1,473
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
TOTAL
0
0
240
1,473
15,384
1,478
18,575
Page 5
5/15/2014
10:51 AM
Flare Start Date 04/0112014
Flare End Date 04/30/2014
FS3 Flare Report Total Volume (MSCF) 11713
Report
ReporSystem Date Start Time Stop Time Duration intermittent Black Smoke Planned Reported By Volume
Numbs
14-128 Controlletl Blowtlown 04/1912014 12:05:00 am 12:15:00 am 10 min NO
No Yes BPI\BOUWKA 240
Determination Cause T\C 1806 shutdown for planned maintenance
Action Taken Completed shutdown. -- —
_No Yes BPI\8OUWKA - 1473
14-128 Controlled Blowdown 04/19/2014 12:30:00 am 2:30:00 am 120 min No
Determination Cause T\C 1806 spin cooling
Action Taken Completed spin cooling.
Total Volume (MSCF) 1713
Page 5 of 9
Generated 05/05/2014 10:32:25AM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Number 2, Facility Name 3. Field 4. Operator 5.
90000030 PBU FS 3 PBU - EOA BP
Disposrtoo Volume MCF 20 For production from multiple Pools,lis[contri6
Total volume.
6. Sold
19. Remarks
and
Signature
Printed Name
my
Date
Pool
Lease Use
Use Only
pool as
Date
Note: All volumes must be corrected
to pressure of 14.65 Asia and to a
temperature of 60o F. Authority 20
VI -f-
Form 10-422 Rev. 5/2009
INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
0
7. Reinjected
8. Flared or vented 1 hour or less
784
9. Flared or vented more than 1 hour (see Instr.)
2,681
16,532
10. Pilot and Purge
4,945
11. Assist Gas
12. Fuel gas used in lease operations.
651,202
13. Other (see instructions)
0
14. TOTAL VOLUME (ITEMS 6-12)
676,144
0
15. NGL Gas Equivalent
0
16. Purchased gas
17. Transferred from. CGF
667,734
18. Transferred to. (Express as a negative #) CGF
-24,002,260
19. Remarks
and
Signature
Printed Name
my
Date
Pool
Lease Use
Use Only
pool as
Date
Note: All volumes must be corrected
to pressure of 14.65 Asia and to a
temperature of 60o F. Authority 20
VI -f-
Form 10-422 Rev. 5/2009
INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INN.
PRUDHOE BAY UNIT- FS -3
GAS FLARING INCIDENT REPORT
May 2014
DATE TIME wwnIc
5/19/2014 1700-1710 40 Not required for unplanned events <= 1 hr
TOTAL 40
(planned Events greater than 1 hour
VOLUME DESCRIPTIONOF INCIDENT&CAUSE
DATE TIME
See attachments
TOTAL 0
Events Less Than or Equal 1 Hour AND 4= 5,000 n1w
armed
TIME
VOLUME DESCRIPTION OF INC(
DATE
5/15/2014
0211-0215
60 See attachments
5/15/2014
1004-1044
484
5/19/2014
2025-2035
60
5/23/2014
1655-1705
80
5/24/2014
0045-0055
60
TOTAL
744
Manned Events
Exceeding 1 Hour OR > 5,000 mcf
TIME
VOLUME DESCRIPTION OF INS
DATE
5/15/2014
0230-0430
1,150 See attachments
5/19/2014
1000-1200
868
5/21/2014
1345-1525
463
5/23/2014
1000-1255
200
TOTAL
2,681
TOTAL
Unplanned Events
< 1 Hour
40
Unplanned Events > 1 Hour
0
744
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
2,681
16,532
4,945
24,942
1=4
Not required for unplanned events <=1 hr
See attachments
See attachments
See attachments
Page 6
6112/2014
10:40 AM
Flare Start Date 0510112014
Flare End Date 05/31/2014 3465
FS3 Flare Report Total Volume (MSCF)
No Yes BP1\WELBORD
14-166 Controlled Blowdown 05/19/2014 1000:00 am 12:00:00 pm 120 min No
Determination Cause 1804 Spinning for water wash ----
Action Taken Completed water was — -
868
--� - BP1\WELBORD 60
No Yes
t
14-166 Controlled Blowdown 05/1912014 8:25:00 Pm 8:35:00 pm 10 min No
Intermittent
Black Smoke Planned Reported By Volume
Report Date Start Time Stop Time Duration
System
Yes 8P1\WELBORD 60
Numbs
Blowdown 0511512014 2:11.00 am 2:15:00 am 4 min
No
No
14-164 Controlled
T\C 1804 shutdown for planned maintenance
Determination Cause
Completed shutdown.
---
- - - - Yes BP1\WEL8ORD 1150
Action Taken
Blowtlown 05/1512014 2:30:00 am 4:30:00 am 120 min
No
No
14-164 Controlled
Determination Cause % 1804 spin cooling
------
Completed spin cooling.
Yes BP1\BOUWKA 484
Action Taken �— _—
Blowdown 05/15/2014 10:04:00 am 10:44:00 am 40 OnNo
No
14A64 Controlled
DS15 B 8 D C1L's shutdown for planned maintenance
Determination Cause
- --- -
Action Taken Completed depmssudng. _
No Yes BP1\WELBORD
14-166 Controlled Blowdown 05/19/2014 1000:00 am 12:00:00 pm 120 min No
Determination Cause 1804 Spinning for water wash ----
Action Taken Completed water was — -
868
--� - BP1\WELBORD 60
No Yes
t
14-166 Controlled Blowdown 05/1912014 8:25:00 Pm 8:35:00 pm 10 min No
Determination Cause
TC 1803 depressured for water wash -- - - -
Action Taken Completed shutdown.
No Yes BP1\DONATR 463
— 1:45:00
14-168 Other 05121/2014 1:45:00 pm 3:25:00 Pm 700 min No
Determination Cause 1803 T/C Spring Water wash Crank and normal Turbine Stop. - - -- -
Completed the Water wash and completed a normal Stop of the Turbme�—�— -
Actio nTaken
--BP1\GARSKEH 200
14-172 Controlled Blowdown 05/23/2014 10:00:00 am 12:55:00 pm 175 min Yes No Yes
engagment. Due to requiretl SILOPA testing.
Determination Cause 1803 had 3 start attempts, one without a starter - — — - -
1803 was succesfully started and loaded.
Action Taken — — — _
No Yes BP1\GARSKEH
14-173 Controlled Blowdown 05124/2014 12:45:00 am 12:55:00 am 10 min No
Determination Cause Attempted start of 1804 after Required SILOPA testing.
Slowdown competed 2nd attempt
Action Taken _ �—
Total Volume (MSCF)
Generated 06103/2014 9:13:32AM
60
3465
Page 6 of 10
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Per -u [Tv RFPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name
0290000030 PBU FS 3
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator 5. MonthNear of Disposition
BP June -2014
20. For production from multiple pools, list contribution or each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
PRUDHOE 640150 100.00%
7. Reinjected
0
8. Flared or vented 1 hour or less
1,250
9. Flared or vented more than 1 hour (see inslr.)
677
10. Pilot and Purge
18,105
11. Assist Gas
2,039
12. Fuel gas used in lease operations.
802,763
Official Use Only
13. Other (see instructions)
0
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
824,834
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
--7j /4
Com issioner Date
17. Transferred from: CGF
819,011/e,
18. Transferred to: (Express as a negative #) CGF
-21,708,804
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
allies Alaska
Signature � Title Manager Production Taxe7T-
Note: All volumes must corrected
to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
AAC25.235.
Printed Name Diane Colle Phone (907) 564-5775 Date
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -3
GAS FLARING INCIDENT REPORT
June 2014
Events less than or equal to 1 hour
planned
TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
DATE
240 Not required for unplanned events <= 1 hr
6/23/2014 0850-0855
6/23/2014 0910-0915
75
6/27/2014 0228-0233
240
6/27/2014 0430-0435
75
TOTAL
630
tplanned Events greater than 1 hour
DESCRIPTION OF INCIDENT & CAUSE
DATE TIME
VOLUME
See attachments
TOTAL
0
tanned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
TIME
VOLUME DESCRIPTION OF INCIDENT &CAUSE
DATE
6/8/2014 1600-1610
75 See attachments
6/8/2014 1729-1739
155
6/8/2014 1808-1818
75
6/28/2014 1326-1336
240
6/28/2014 1700-1710
75
TOTAL
620
Manned Events Exceeding ' Hour OR > 5,000 mcf
TIME
VOLUME DESCRIPTION OF INCIDENT &CAUSE
DATE
6/6/2014 1030-1430
677 See attachments
TOTAL
677
TOTAL
Unplanned Events < 1 Hour
630
Unplanned Events> 1 Hour
0
Planned Events < 1 hour and not
620
exceeding 5,000 MCF
Planned Events> 1 hour or
677
exceeding 5,000 MCF
18,105
Pilot Purge
21039
Assist
TOTAL FLARED VOLUME
22,071
4CFION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr
See attachments
ACTION TAKEN TO F
See attachments
See attachments
Page 5
7116/2014
1:45 PM
Flare StartDate 06/01/2014
Flare End Date 06/30/2014
F53 Flare Report Total Volume (MSCF) +927
Report Date Stag Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
Numbs System yes BPI\BOUWKA 577
14-185 Controlled Blowdown 06/06/2014 10:30:00 am 2:30:00 Pm 240 min No
No
Determination Cause 1806 AL T\C system start up & shutdown due Major Overhaul work - Overspeed trips, etcthen cool downAction Taken - -
Completed spin cooling. -- - ----- -
Yes BPt\BOUWKA 75
14-189 Controlled Blowdown 06/08/2014 4:00:00 Pm 4:10:00 Pm
10 min No No --
Determination Cause 1806 AL T\C system startup after Major Overhaul
Action Taken Completed start ups __ _-------
5:39:00 Pm -----
14-189 Controlled Blowdown 06/06/2014 5:29:00 Pm 10 min No
Determination Cause 1806 AL T\C system shutdown due l0 a problem associated with hi temp control
Action Taken Completed shutdown. _— .--- ----
14-189 Controlled Blowdown 06/08/2014 6:08:00 pm 6:18:00 pm 10 min No
Determination Cause 1806 AL T\C system start up after temp Control problem fixed
Action Taken
Completed start up. _ .------
---- --
--- -- Yes BPt\BOUWKA 155
No
No Yes --
-- Yes
- Yes BP1\BOUWKA 75
_ -
No Yes
14-218 Controlled Slowdown 06/2812014 1:26:00 pm 1:36:00 Pm 10 min No
ination Cause 1806 manual shutdown to trouble shoot and repair 2nd stage novel control voltage equipment.
BP1\GARSKEH 240
Determ
1806 equipment tlepressured. - - - - -- --
75
Action Taken _ -- - -----_--�- - _ No Yes BP1\GARSKEH
_ _ _. _ : 10 min No
_._----._ - _ 5.10:00 Pm
14-216 Other 06/28/2014 5:00:00 pm
Determination Cause 1806 purge volume on start-up.
Action Taken 1806 on line and loaded.
Total Volume (MSCF)
Generated 07/09/2014 3:12:32PM
1927
Page 4 of 7
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000030
2. Facility Name
PBU FS 3
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
I July -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
912
9. Flared or vented more than 1 hour (see instr.)
5,334
10. Pilot and Purge
6,394
11. Assist Gas
1,373
12. Fuel gas used in lease operations.
286,879
13. Other (see instructions)
0
Official Use Only
Authorization>1 hr.
Salary
�� 2
MCF
14. TOTAL VOLUME (ITEMS 6-12)
300,892
Lease Use
MCF
15, NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
293,059
Commissioner Date /
18. Transferred to: (Express as a negative #) CGF
-8,024,484
19. Remarks:
I hereby certify that t e foregoing is true and correct to the best of my knowledge.
Signature Title Mana er Production Taxes and Royalties Alaska
Wft
Note: All volumes must be corrected
to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
AAC25.235.
Printed Name Diane Colley Phone (907) 564-5775 Dale
vL-F
� 14-111
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -3
GAS FLARING INCIDENT REPORT
July 2014
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT&CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL
TOTAL
G
I
See attachments
See attachments
7/9/2014 1320-1330
260 See attachments See attachments
7/10/2014 0455-0505
19
7/10/2014 1345-1415
470
7/11/2014 0230-0245
80
7/11/2014 0935-0945
3
7/11/2014 1134-1145
80
TOTAL
912
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME
VOLUME DESCRIPTION OF INCIDENT&CAUSE ACTION TAKEN TO ELIMINATE CAUSE
7/11/2014 1230-1800
5,334 See attachments See attachments
TOTAL
5,334
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events> 1 Hour
0
Planned Events < 1 hour and not
912
exceeding 5,000 MCF
Planned Events> 1 hour or
5,334
exceeding 5,000 MCF
Pilot Purge
6,394
Assist
1,373
TOTAL FLARED VOLUME
14,013
Page 6
8/14/2014
2:23 PM
FlareStartDate 07/01/2014
Flare End Date 07/31/2014
FS3 Flare Report
Total Volume (MSCF)
6246
Report
System Date StartTime Stop Time Duration
Intermittent
Black Smoke
Planned Reported By
Volume
Numbs
14-234 Controlled 8lowdown 07/09/2014 1:20:00 pm 1:30:00 pm to min
No
No
Yes BPMELBORD
260
Determination Cause 1806 AL T/C shutdown with full depressuefor TAR
Action Taken Completed Shutdown
14-235 Controlled slowdown 07/10/2014 4:55:00 am 5:05:00 am 10 min
No
No
Yes BP11WELBORD
19
Determination Cause Blew down'CIP separator for TAR
Action Taken Completed blow down
--
14-235 Controlled Blowdown 07110/2014 1:45:00 pm 2:15:00 pm 30 min
No
No
Yes BP1\WELBORD
470
Determination Cause Depressured'A' HP separator and Gas scrubber for TAR
Action Taken Completed Depressure
14-240 Controlled Blowdown 07/11/2014 2:30:00 am 2:45:00 am 15 min
No
No
Yes BP1\WELBORD
80
Determination Cause 1803 T/C shutdown/blowdown for TAR
Action Taken Completed blowdown-
14-240 Controlled Blowdown 07/11/2014 9:35:00 am 9:45:00 am 10 min
No
No
Yes BPI\WELSORD
3
Determination Cause 1802 T/C shutdown for TAR
Action Taken Completed shutdown
14-240 Controlled Blowdown 07/11/2014 1134:00 am 11:45:00 am 11 min
No
No
Yes BP1\WELBORD
Determination Cause 1804 T/C shutdown/blowdown for TAR
Action Taken Completed blowdown
14-240 Controlled Blowdown 07/11/2014 12:30:00 pm 6:00:00 pm 330 min
No
No
Yes BP1\WELBORD
5334
Determination Cause Blowdown of all common lines, residue gas line, and facility vessels/piping for
TAR
Action Taken Completed blowdown
_
— _
-
Total Volume (MSCF)
6246
Generated 08/04/2014 11:24:17AM Page 7 of
L
From:
Sent:
To:
Cc:
Subject:
AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj
Sunday, July 20, 2014 11:29 AM
Hunt, Jennifer L (DOA)
Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary
OPS PCC EOC TL; AK, HSSEE Env Adv East; Burgess David
; AK,
Arthur, Gregory; AK, OPS FS1 OSM; AK, OPS FS2 Facility OTL; AK,
OPS FS1 Facility OTL; AK, AK, OPS GPMA Facility OTL; AK, OPS
AK, OPS FS3 Facility OTL; AK, OPS FS3 OSM;
GPMA OSM; Hiester, Wendy
Gas flaring events at FSI, FS2,VMLPC
CC: Dave Roby, AOGCC
To: Jennifer Hunt, AOGCC dave robygalaska.gov
Jennifer huntCa7alaska.aov
From: Kellie Okonek, GPB Production Optimization Team Leader
CC: Victoria Ferguson, AOGCC
victoria 5rquson iaiaska.gov
Afl
topping at 07/10/2014 23:10 with a volume of 659
A flaring event occurred at FS1 starting at 0711012014 22:35 and sdue to high gas
CCP(MSCF) compressormt had a volume problems duet greatere eve1805 shutdow000n. F (MSCF)
g sand
p ewas
When 1805 was loadedd line pressure caused by
FS2 in at 07/06/2014 04:00 with a volume of 1036
A flaring event occurred at FS2 starting at 07/06/2014 02:00 and stopping
(MSCF). The event lasted for 120 minutes, and was due to depressurization of DS9 commonline for planned
maintenance.
33 and stopping at 07/0912014
A flaring event occurred at FS2 starting at 0710912014 16:nline for smart pigging.
with a volume of 4
(MSCF). The event lasted for 68 minutes, and was due to depressurization of DS9 commonlin
A flaring event occurred at FS2 starting at 0711112014 08:32 and stopping at 0 hutdo014 due
to with o volume of 75
failure associated with ed fon the fuel gas knock out drum. Flaring stopped when compressor was loaded.
(MSCF). The event lasted for 152 minutes, and was due to SN -IP T\C 1802 shutdown due to control\aded mentation
HHL
036
A flaring event occurred at FS2 starting at 07/13/2014 14:22 and stopping at of 9E/ 2014 16:57 with a volume of ging
(MSCF). The event lasted for 155 minutes, and was due to depressurization of 9E/9A commonlines for smart pigging.
FS3 2-30
stopping and was due to 5334 wn
A flaring event occurred MSCF). The evvent la edtforr 330 minutes. The evat ent had a volume grreatertthaln 5000 (MSCF), and
a volume of 5
of all common lines, residue gas line, and facility vesselslpiping for planned turnaround.
LPCin at 06/15/2014 with a volume of 15325 (MSCF).
A flaring event occurred at LPC starting at 06114/2014 20:37 and stoppingvent
and was due tThe evet wets a black o 1808 event. Th re-injection compressor omp essor or 203 mishutdownnutes. Thee for fullll plant planned 000
ed shutdown
(MSCF),
A flaring event occurred at LPC starting at 06/15/2014 00:01 and stopping at 06/1512014 17:30 with a volume of 956
(MSCF). The event was a black smoke event. The event lasted for 1049 minutes. The event hada volume greater than
5000 (MSCF), and was due to depressurization of the residue gas line and commonlines through LPC for planned
shutdown.
k flaring event occurred at LPC starting at 06/2812014 18:58 and stopping at 061281 8 Reinjection pre 19:03 with a volume of 81
MSCF). The event a failus a black smoke
stopped when due tosso�was repaired and rreeoaded.ssor utdown because of
;ontrol/instru
Please let me know if you have any questions.
Kellie Okonek (alt. Travis
optimizationTL
PCCIEOC Production Op
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 382 1370 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akoosgcceoctlCa7bp com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name
0290000030 PBU FS 3
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator 5. MonthNear of Disposition
BP August -2014
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
522
9. Flared or vented more than 1 hour (see instr.)
9,205
10. Pilot and Purge
14,083
11. Assist Gas
10,902
12. Fuel gas used in lease operations.
438,377
13. Other (see instructions)
0
Official Use Only
Authorization >I hr:
Safety
lJ
MCF
14. TOTAL VOLUME (ITEMS 6-12)
473,089
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
452,460
/f /11 , ✓ l L
! Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-15,940,501
19. Remarks:
I hereby certify that foregping is true and correct to the best of my knowledge.
Signature Title Maria er Production Taxes and Ro aloes Alaska
�
Note: All volumes must and to teda
to pressure of 14.65 psis is and to a
temperature of 60o F. Authority 20
AAC25.235.
Phone (907) 564-5775 Date 9
!a/9ll4'
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
8/14/2014
1422-1434
TOTAL
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -3
GAS FLARING INCIDENT REPORT
August 2014
60 Not required for unplanned events <= 1 hr
60
Not required for unplanned events <= 1 hr
8/12/2014 0300-0900
9,015 See attachments
See attachments
8/12/2014 1400-1600
120
TOTAL
9,135
Planned Events Less Than or Equal 1 Hour AND <= 5,000 and
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
8/13/2014 2334-2400
242 See attachments
See attachments
8/14/2014 0330-0335
80
8/14/2014 1706-1711
60
8/15/2014 1430-1435
80
TOTAL
462
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
8/29/2014 0028-0149
70 See attachments
See attachments
TOTAL
70
TOTAL
Unplanned Events < 1 Hour
60
Unplanned Events> 1 Hour
9,135
Planned Events < 1 hour and not
462
exceeding 5,000 MCF
Planned Events > 1 hour or
70
exceeding 5,000 MCF
Pilot Purge
14,083
Assist
10,902
TOTAL FLARED VOLUME
34,712
Page 6
9/15/2014
4:46 PM
Flare Start Date 08/01/2014
Flare End Date 08/31/2014
FS3 Flare Report
Total volume (MSCF) 9727
Repoli
d BVolume
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke N tanned BPPBo WKAy A o 9015
14-297 Controlled Blowtlown 08/12/2074 3:00:00 am 9:00:00 am 360 min Yes
No _.
Determination Cause STV -IP T\C 1802 unloaded due to low gas rates. Attempting to increase rates
Action Taken Loaded STV/IP TIC. — BP1\BOUWKA 120
14-297 Controlled Blowdown 08/12/2014 2:00:00 pm 6:00:00 pm 240 min Yes
No No
Determination Cause T\C 1803 after attempting 3 starts, Shutdown due to writrohinstmmentation failure, need Overhaul Crew in am
Action Taken Completed Shutdown ---
14-301 Controlled Blowtlown 08/13/2014 11:34:00 pm 12:00:00 am 26 min No
No
Determination Cause Depressured 14BC Commonline and MI line for gas leak on MI flange behind FS3.
Action Taken Completed the depressurization of the 14BC Commonline and MI line.
14-302 Controlled Slowdown 08/14/2014 3:30:00 am 3:35:00 am 5 min No
Determination Cause Started 1803 after Shutdown of Plant.
Action Taken Completed the startup sequence of 1803 TIC,
Yes BP1\DONATR 242
No Yes
BP100NATR 80
No _... Yes BP100NATR 60
14-302 Controlled Blowtimn 08/14/2014 5:06:00 pm 5:11:00 pm 5 min No
Determination CaUSe 1803 was shutdown to troubleshoot the DC LO pump run issue.
Action Taken Completed the Shutdown sequence of 1803 TIC. _ _ -----
14-308 Controlled Blowdown 08/15/2014 2:30:00 pm 2:35:00 pm 5 min No
No Yes BP1\DONATR 80
Determination Cause 1803 TIC Startup after DC LO Pump troubleshooting. One start
Action Taken Completed the Start up sequence of 1803 TIC.
14-328 Controlled Blowdown 08/29/2014 12:28:00 am 1:49:00 am 81 min No
Determination Cause Depressure 4906 NL header and part of DS14 A/L line
Action Taken Completed depressuring
No Yes BPI\BOUWKA 70
Total volume (MSCF) 9727
Page 7 of 10
Generated 09/09/2014 1:36:11 PM
Hunt Jennifer L (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent: Sunday, August 17, 2014 8:57 PM
To: Hunt, Jennifer L (DOA)
Cc: Roby, DOr,Victoria Castano, Alejandra; Benson, A
Arthr, Gregoryuger, De O; AKOPS GC3&PCC OSM; AK, OPS CCP CGF OSMAK,
OPS CGF OTL; AK, OPS GC1 OSM; AK, OPS GC1 Facility OTL; AK, OPS FS3 OSM; AK,
OPS FS3 Facility OTL
Subject: Flaring Events at CGF, GC1 andiffilm
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson,
AOGCC
iennifer hunt a alaska.aov dave roby(a)alaska.clov
victoria fercusonealaska oov
From: Wendy Hiester, GPB Production Optimization Team Leader
CGF
Following advance notification to Victoria Ferguson of the AOGCC, extended flaring events occurred at CGF
from August 10-16, 2014 while restarting the facility after a prolonged planned shutdown for maintenance.
Flaring was permitted to continue while operations personnel attempted to restart the facility equipment. These
start-up related flaring events have stopped now that the CGF shutdown is complete.
1) On 8/16/2014, flaring at CGF started at 01:30 and stopped at 06:00 with a volume of 15972 (MSCF).
The event lasted for 270 minutes.
2) On 8/15/2014, flaring at CGF started at 00:01 and continued through midnight with a volume of 81383
(MSCF). The event lasted for 1439 minutes.
3) On 8/14/2014 flaring at CGF started at 02:45 and continued through midnight with a volume of 13731
(MSCF). The event lasted for 1275 minutes.
4) On 8/12/2014, flaring at CGF started at 04:30 and stopped at 05:05 with a volume of 255 (MSCF). The
event, which lasted for 35 minutes, was due to shutdown of Compressor 1802 for planned maintenance.
The event ended when depressurization of the compressor was complete.
5) On 08/10/2014, flaring at CGF started at 19:40 and stopped at 23:58 with a volume of 32410 (MSCF).
The event, which lasted for 258 minutes, was due to depressurizing the WOA 60" line and 4938 Inlet
Separator vessel for planned maintenance. The event ended when depressurization was completed.
GC1
A flaring event also took place at GCI on 08/10/2014 due to the same planned maintenance on the WOA 60"
line as flaring event #5 at CGF above. The IP and LP compressors flared during the required swap of production
from the GC 1 Annex to the Old Plant to perform the maintenance. The flaring stopped when the gas rate to old
plant was stable. The flare event at GCI started at 08/10/2014 19:51 and stopped at 08/10/2014 23:10 with a
volume of 491 (MSCF). The event lasted for 199 minutes.
FS3
Flaring events occurred at FS3 from August 12-14 while restarting the facility after a prolonged planned
shutdown for maintenance. These flaring events have stopped now that maintenance is complete.
14 03:35 with a
1) A flare event The event last dstarting
for 5 Ominutes0and was03:30anue d
o ° starting the 81803 compressor. The flaring
(MSC volume of 80
)
stopped when the startup sequence was complete.
a volume of
at
14 14:34 w
in
2) A flare event at FS3 . The event lastedng at for 12 minutes and was due to depr14 14:22 and essur n/g the014D commonhline at DS14 60
( order
to when the line was depressured to a safe energy
order to isolate a well slot choke. The flaring stopped
state.
and
at
3) A flare event
at FS3 starting for 5 Ominutes0and was 14 6due toYshutting down the 1803 volume of 60
1803 compressor to
(MSCF). T event lasted
flaring stopped when the shutdown sequence was
troubleshoot the DC LO pump run issue. The
complete.
/13/2014
e Of
4) A flare event at FS3 The event lasted t 08 1 minutes1423:34 and and was stopping
dap assuring the214BC common4:00 with a lone and
MI (MSC )
MI line for a gas leak on the MI flange. The flaring stopped when the lines were depressured to a safe
energy state.
5) A flare event at FS3 starting at 08/12/2014 14:00 and stopping at 08/12/2014 18:00 with a volume of
120 (MSCF). The event lasted for 240 minutes and was due to shutting down T\C 1803 after attempting
3 starts. Flaring stopped once shutdown was complete.
2014
o with a volume of
at
6) A flare event aThe evenlastedat 0for13600mnuteOsOFlarng occurgred when he STV-OIP T\C 1802 unloaded
due low gas
increasing rates to load the STV/IP T/C.
due to low gas rates. Flaring was stopped by g
Please let me know if you have any questions.
Wendy Hiester (alt. Kellie Okonek)
pCCIEOC Production Optimization TL
externaL (907) 659 4472 B / 5566
cell. (907) 227-7144 Harmony BOC)
758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akoosocceoctl@ba com
N
:Tom:
Sent:
fo:
:c:
subject:
L DOA com]
AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.
Saturday, August 30, 2014 3:09 PM
Hunt, Jennifer L (DOA)
Ferguson, Victoria L (DOA); Roby, David S (DOA); Caster Dle 0 Alejandra; Benson, Gary
Arthur, Gregory; AK, HSSEE HSSEEEnv Env Addv vVEasYKAK OPSaFS22 Facility OTL; A; AK, OPS GCIK OPS FS2OOSM;
Bur Facility OTL; AK,
Gas flaring events at GOCP FS23 OSM; AK, OPS FS3 Facility O
TL
CC: Dave Roby, AOGCC
To: Jennifer Hunt, AOGCC dave� @alaska oov_
Jennifer huntC�alaska.ao�
CC: Victoria Ferguson, AOGCC
victoria ferouson@alaska.9ov
W29/2014 09:45
From: Kellie Okonek, GPB Production Optimization Team Leader
at OE
A flaring event occurred at oC75s nutes,tand2wasO14 dueOto shutdownand oof GLT 3200 and depressurization on for planned a volume of 0
(MSCF). The event lasted
maintenance.
87
9 in at 0812912014 16:30 with a volume of 7
The event lasted for 2 st minutes, and was due to depressurization of East side lift gas line for planned
A flaring event occurred at FS2 startin at 08/2912014 00:00 and stopping
(MSCF).
maintenance. tanned
9 in at 0812912014 01:49 ashline for Pe of 7
The event lasted for 81 minutes, and was due to depressurization of the East side lift g
A flaring event occurred at FS3 starting at 0812912014 00:28 and stopping
(MSCF).
maintenance.
Please let me know if you have any questions.
Kellie Okonek optimization TL
PCC/EOC Production Op
Office: (907) 659-4472
Cell: (907) 382-1370
a
kops ceoctl@bp•Com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
iT.f oConoT nG Donni irm GAS DISPOSITION
Form 10-422 Rev. 5/2009
INSTRUCTIONS ON REVERSE SIDE
VTC
311'?/1
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -3
GAS FLARING INCIDENT REPORT
September 2014
Unplanned Events less than or equal to 1 hour
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE '. TIME
VOLUME OES.LRwpo of INCIDENT :CAUSH
; ACTION_!fAKENTOAIIMINATE CAUSE
9/27/2014 1400-1415
60 Not required for unplanned events <= 1 hr
Not required for unplanned events <=1 hr
9/27/2014 1442-1455
60
Unplanned Events < 1 Hour
9/29/2014 1740-1750
60
6,303
TOTAL
180
exceeding 5,000 MCF
Planned Events > 1 hour or
868
Unplanned Events greater than 1 hour
Pilot Purge
DATETIME
VOLUME DESCRIPTIONOFrINCIDENT &-CAUSE
ACT(POTAKENTOELIMINATECAUSE
9/11-12/2014 2200-1740
5,833 See attachments
See attachments
9/29/2014 1500-1630
470
TOTAL
6,303
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE < TIME _.
VOLUME DESCMPTION OF INCIDENT&: CAU5£
ACTION--TAKENTO1EUmINATECAUSE
9/28/2014 0040-0050
60 See attachments
See attachments
9/29/2014 1900-1910
60
TOTAL
120
Page 1
10/16/2014
10:24 AM
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE .; TIME
VOLUME DESCRIPTION OFMODENT&:CAUSE ACTION TAKENTOE 4.iMINAT€CASSE _
9/28/2014 0110-0310
868 See attachments See attachments
TOTAL
868
TOTAL
Unplanned Events < 1 Hour
180
Unplanned Events> 1 Hour
6,303
Planned Events < 1 hour and not
120
exceeding 5,000 MCF
Planned Events > 1 hour or
868
exceeding 5,000 MCF
Pilot Purge
17,376
Assist
15,016
TOTAL FLARED VOLUME
39,863
Page 1
10/16/2014
10:24 AM
Flare Start Date 09/01/2014
Flare End Date 09/30/2014
FS3 Flare Report Total Volume (MSCF) 7471
Report
Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
14-370 Controlled Blowdown 09/11/2014 10:00:00 pm 12:00:00 am 120 min No
Determination Cause STV -IP T\C 1802 unloaded due to bad gas controller.
Action Taken Attempting to find problem
14-371 Controlled Blowdown 09/12/2014 1201:00 am 5:40:00 pm 1059 min No
Determination Cause STV -IP T\C 1802 unloaded due to bad gas controller.
Action Taken Found problem, SD 1802 @ 13:10, BOL @ 17:40
14-396 Controlled Blowdown 09/28/2014 12:40:00 am 12:50:00 am 10 min No
Determination Cause -RC 1803 depressured for water wash
Action Taken Completed shutdown.
14-396 Controlled Blowdown 09/28/2014 1:10:00 am 3:10:00 am 120 min No
Determination Cause T\C 1803 spin cooling
Action Taken Completed spin cooling.
14-398 Controlled Blowdown 09/29/2014 3:00:00 pm 4:30:00 pm 90 min No
Determination Cause T\C 1803 spinning during water wash
Action Taken Completed shutdown.
14-398 Controlled Blowdown 09/29/2014 7:00:00 pm 7:10:00 pm 10 min No
Determination Cause T\C 1804 depressured for water wash
Action Taken Completed depressuring.
No No uPI rnvi
No No BPI\BOUWKA 5250
No Yes BP1\BOUWKA 60
No
Yes
BP1\BOUWKA
868
No
No
BPI\BOUWKA
470
No Yes BP1\BOUWKA 60
Total Volume (MSCF) 7471
Page 6 of 10
Generated 10/02/2014 2:36:16PM
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj
Sent: Tuesday, September 16, 2014 12:01 PM
To: Hunt, Jennifer L (DOA)
Cc: Roby, David S (DOA); Ferguson, Victoria L (DOA); CaStan0, Alejandra; Benson, Gary ;
Arthur, Gregory; Burgess, David H; AK, OPS GC3&PCC OSM; L; OPS FSI OSM; M; OPS
FS1 Facility OTL; AK, OPS FS2 OSM; AK, OPS FS2 Facility OTL; AK, OPS FS3 OSM; AK,
OPS FS3 Facility OTL
Subject: Flaring events at FS1, FS2, and FS3
CC: Dave Roby, AOGCC
CC: Victoria Ferguson,
To: Jennifer Hunt, AOGCC
AOGCC dave rotiy@alaska aov
'ennifer hunt(c�alaska aov
victoria.ferauson ct alaska.aov
From: Wendy Hiester, GPB Production Optimization Team Leader
In the first half of September, the following flaring events occurred at FSI, F52, and FS3
9/14 FSI
A flaring event occurred at FSI starting at 09/14/2014 00:00 and stopping at 09/14/2014 01:30 with a volume of 10
65
(MSCF). The event lasted for 90 minutes.
Mines for 12-C pig launcher and receiver installation. Flaring
Flaring occurred due to depressuring of the DS12 commo
stopped when depressuring was completed.
9/8 FS2at 09/08/2014 21:04 with a volume of 1190
A flaring event occurred at FS2 starting at 09/08/201414:24 and stopping
(MSCF). The event lasted for 400 minutes. Flaring occurred when the 1801 compressor was shut down to adjust the inlet
gas valves. Flaring stopped when the compressor was restarted.
9/6 FS2
A flaring event occurred at FS2 starting at 09/06/2014 00:00 and stopping at 09/06/2014 21:58 with a volume of 37
77
(MSCF). The event lasted for 181laring to minimum rates to redu
occurred
m$e tarinpressor shut down due to high gas
generator exhaust temperature. FS2 reduced
9/5 FS2
A flaring event occurred at F52 starting at 09/05/2014 00:00 and continuing to 9/6/2014 with a volume of 4127 (MSCF).
enerator
The event lasted for 1440 minutes. Flaring occurred when the 1801 compressor shut down due to high gas g
exhaust temperature. FS2 reduced to minimum rates to reduce flaring.
9/4 FS2
A flaring event occurred at FS2 starting at 09/04/2014 13:11 and continuing to 09/05/2014 with a volume of 198
generator
(MSCF).
temperature9 FS2 reducee event lasted for 64minutes. laring occurred when te d to minimum rates toned uDe flaring.lressor shut down due to high gas
9/1 FS2
A flaring event occurred at FS2 starting at 09/01/2014 08:30 and stopping at 09/01/2014 11:30 with a volume of 56
(MSCF). The event lasted for 180 minutes. Flaring occurred due to depressuring the 9A common line shutdown for
planned maintenance. Flaring stopped when depressuring was completed.
9/12 FS3
A flaring event occurred at FS3 starting at 09/12/2014 00:01 and stopping at 09/12/201417:40 with a volume of 525
(MSCF). The event lasted for 1059 minutes. The flaring occurred when STV -IP compressor 1802 unloaded due to a bad
gas controller. The problem was found, the 1802 compressor was shut down at 13:10, and the flaring stopped when the
compressor was restarted.
9/11 FS3 application has reported a flare event (ID 8420) at F53 starting at 09/11/2014
A flaring event occurred at The flare web app The event lasted for 120 minutes. The problem was
22:00 and continued into 09/12/2014 with a volume of 583 (MSCF).
or was shut down, and the flaring stopped when the compressor was restarted.
found on 9/12/2014, the 1802 compress
Please let me know if you have any questions.
Wendy Hiester (alt. Kellie Okonek)
PCCIEOC Production optimization TL
external: (907) 659 4472 (BOC)15566 (PBOC)
cell: (907) 227-7144 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mailo- e____ °ctlPbP c°m
Hunt, Jennifer L DOA
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj
Sent: Thursday, October 16, 2014 9:53 AM
To: Hunt, Jennifer L (DOA)
Dn Gary A; Cc: Gregory; ViAKf IHSSEEOEn Adv West; Kruger, Dale a0; AK, OPS GC1 OSM; AK, OPS GCI Arthur,
Facility OTL; HSSEEauger, Wayne A; Burgess, David H; AK, OPS FS1 OSM; AK, OPS FS1 Facility
OKLOPS GPMA Facility v East, K CPS LoaderGPMA OSM; AK, OPS PCC OEOC TL OPS FS3 OSM;
Subject: Gas flaring events at GC1, FS1, FS3, LPC
CC: Dave Roby, AOGCC CC. Victoria Ferguson, AOGCC
To: Jennifer Hunt, asks 0 r„h„@aaska.gov victoria.fergusonCc lalaska.gov
Jennifer huntCc�alaska.gov
From: Kellie Okonek, GPB Production Optimization Team Leader
15/2014 h a volume of
ng
A flaring event MSCF). The eoenturred at FS1 starting had a volume greatertthan 5000 (MSCF)aand was115/2014 02:17 nd t f arriingOfor the field
toff e CGF bo ster833
A flaring event at FS1 starting at 1011012014 16:50 and stopping at 1011012of 71254 (MS
shutdown. 014 17:50 with a volume d
The event had a volume greater than 5000 (MSCF), and was due to shutdown/depressure of 126 commonline for planne
maintenance. in at 10104/2014 15:45 with a volume of 378 (MSCF). The
A flaring event at FS1 starting at 1010412014 14:00 and stopping
event lasted for 105 minutes, and was due to LPS T/C 1804 crank spin for planned waterwash.
A flaring event at FSI starting at 10/0212014 15:50 and stopping at 10/02/2014 17:45 with a volume of 878 (MSCF). The
s due to LPS T/C 1804 spin cooling for planned waterwash.
event lasted for 115 minutes, and wa
A flaring event at FSI starting at 10102/2014 08:35 and stopping at 10/0212014 10:20 with a volume of 583 (MSCF). The
event lasted for 105 minutes, and was due to LPS T/C 1803 crank spin for planned waterwash.
event lasted foA flaring event r minutes. starting
at10/0112014
was 1201 t LPS TIC 1803 aoppsp9 cooat ling for Plannned waterwash.
14 03:15 with a me of 1120 (MSCF). The
A flaring event at LPC starting at 10/14/2014 00:00 and stopping at 10114/2014 12:16 with a volume of 5170 0 (MSC. The
event was a black smoke event. The event lasted for 736 minutes. The event had a volume greater than 5000 (MSCF),
event
at 10/14/2014 with a volume of 4208 (MSCF).
and was due to depressurization for RGI (residue gas injection) line for planned maintenance.
A flaring event at LPC starting at 10/13/2014 21:32 and stopping
or
was a black smoke event. The event lasted for 148 minutes, and was due to depressurization of the 24" commonline
planned maintenance. in at 10113/2014 20:33 with a volume of 214 (MSCF). The
A flaring event at LPC starting at 10/13/2014 20:29 and stopping
event was a black smoke event, and was due to 1807 injection compressor sld and depressure for RGI maintenance.
A flaring event at GCI starting at 10/06/2014 01:19 and stopping at 10/06/2014 10:02 with a volume of 406 (MSCF). The
at 10/05/plan 03:32 with a volume of 1650 (MSCF). The
event lasted for 523 minutes, and was due to depressurization of G-44 for planned maintenance in activities.
A flaring event at 27 starting at 10as du 14 depressurization
and zatiostopping
event lasted for 127 minutes, and was due to depressurization of PM2 LDF in support of planned pigging
A flaring event at GC1 starting at 10/03/2014 08:00 and stopping at 10/03/2014 16:00 with a volume of 1820 (MSCF). The
event lasted for 480 minutes, and was due to depressurization of PM2 LDF in support of planned pigging activities.
Theties.
A flaring event at GC1 starting at 09/29/2014 00:10 and stopping at 09129/2014 03:00 with a volume of 560 (M
0
n
event lasted for 170 minutes, and was due to high transit gas pressuree Hari 014 18:30 with a volume of 290 (MSCF). The
flaring in activities.
A flaring event at GC1 starting at 09/28/2014 14:20 and stopp 9 at
event lasted for 250 minutes, and was due to depressurization of PM2 LDF in support of planned pigging
A flaring event at FS3 starting at 10/01/2014 15:35 and stopping at 10101/2014 17:15 with a volume of 405 (MSCF). The
event lasted for 100 minutes, and was due to LPS T/C 1804 spin cooling for planned waterwash.
A flaring event at FS3 starting at 09/29/2014 15:00 and stopping at 09/29/2014 16:30 with a volume of 470 (MSCF). The
event lasted for 90 minutes, LPS T/C 1803 crank spin for planned waterwash.with a
0 am
event lasted A flaring event
minutes,
tainat and w/28/ 0e 4 o1:1 T/C 1803 stopping
n cooling for pla0nned waterwash
me of 868 (MSCF). The
1
ng at
2014 03:10 with a
0 and stoPP
event lasted foA flaring eventra120 minuteins, and ttd w/as due to 1:1 TIC 1803 d'epressur zation for wa erwashvolume of 60 (MSCF). The
Please let me know if you have any questions.
Kellie Okonek
PCC/EOC Production Optimization TL
Office: (907) 659-4472
Cell: (907) 382-1370
Amp �aoctlPbo.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
DECEIVED
NOV 18 2014
AOGCC
1. Facility Number 2. Facility Name
0290000030 PBU FS 3
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator 5. MonthNear of Disposition
BP October -2014
20. For production from multiple pools, list contribution bleach pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00
8. Flared or vented 1 hour or less
360
9. Flared or vented more than 1 hour (see instr.)
1,609
10. Pilot and Purge
17,932
11. Assist Gas
2,803
12. Fuel gas used in lease operations.
942,750
Official Use Only
13. Other (see instructions)
0
Authorization >l hr:
Safety
�(P Q y
MCF
14. TOTAL VOLUME (ITEMS 6-12)
965,454
Lease Use
MCF
15, NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
/_2
Commissioner 7�-�*�`� Dale
17. Transferred from: CGF
960,682
18. Transferred to: (Express as a negative #) CGF
-24,622,710
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
ccdll/kkk/..h Title Mana er Production Taxes and Royalties Alaska
Signature COW
Printed Name Diane Colley Phone (907) 564-5775 Date
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.
V7-I—
t a16I J14
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -3
GAS FLARING INCIDENT REPORT
October 2014
DATE nmc _ _-
10/1/2014 2203-2213 60 Not required for unplanned events <=1 hr
10/2/2014 0001-0011 60
TOTAL 120
Not required for unplanned events <=1 hr
DATE TIME VOLUME DESCRIPTION OF INCIDENT ax t,NU>c See attachments
10/1/2014 1535-1715 405 See attachments
10/15/2014 1502-1632 403
TnTAL 808
nMliiA1VED
NOV 18 2014
10/20/2014 0910-0920
240 See attachments
TOTAL
240
Manned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME
VOLUME DESCRIPTION OF INI
10/27/2014 0750-1400
186 See attachments
10/28/2014 0845-1000
615
TOTAL
801
TOTAL
Unplanned Events < 1 Hour
120
Unplanned Events > 1 Hour
808
Planned Events < 1 hour and not
240
exceeding 5,000 MCF
Planned Events> 1 hour or
801
exceeding 5,000 MCF
Pilot Purge
17,932
Assist
2,803
TOTAL FLARED VOLUME
22.704
K9
See attachments
1 111 312 01 4
2:39 PM
Flare Start Date 10/0112014
Flare End Date 1 013 112 01 4
RECEIVED
NOV 18 2014
FS3 Flare Report
ReportDate Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
Numbs System No No Bpl\BOUWKA 405
14-399 Controlled Slowdown 10/0112014 3:35:00 pm 5:15:00 pm
100 min No -
Determination Cause T\C 1804 spinning for water wash
Action Taken Completed water wash----
--
Total Volume (MSCF) 1969
14-024 Controlled Blowdown 10/15/2014 3:02:00 pm 4:32:00 pm 90 min No No
Determination Cause 1802 Shutdown due to IP21 wntrol issues. 3 start attempts also and one shutdown.
No BP1\DONATR 403
-
Completed shutdown and restart the -- -
Action Taken ---- ---"---------------
-- --
--
--
14-433 Controlled Blowdown 10/20/2014 9:10:00 am 9:20:00 am 10 min No No
Determination Cause 1806 TIC normal stop to conduct CASIS Testing on the machine.
Yes BPI\DONATR 240
-
Action Taken Completed the shutdown sequence_ _ .__ -_ ------
- -
--- -- - -
- -- -� _-
14-046 Controlled Slowdown 10/27/2014 7:50:00 am 2:00:00 pm 370 min No No
BPt\BOUWKA 186
Yes --
Determination Cause Depressuring of OS13 CIL Din prep for line work
Action Taken Completed depressudng.
-
14-050 Controlled Blowdown 10/2812014 8:45:00 am 10:00:00 am 75 min No No
Yes BP1\BOUWKA 815
--
Determination Cause T\C 1802 shutdown for maintenance, flared IP/STV
Action Taken Completed maintenance_
Total Volume (MSCF) 1969
Page 7 of 10
Generated 1111712014 9:25:27AM
Hunt, Jennifer L (DOA
From: AK, OPS PCC EOC TL (AKOPSPCCEOCTL@bp.com]
Sent: Thursday, October 16, 2014 9:53 AM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur,
Gregory; AK, HSSEE Env Adv West; Kruger, Dale O; AK, OPS GC1 OSM; AK, OPS GC1
Facility OTL; Hauger, Wayne A; Burgess, David H; AK, OPS FSI OSM; AK, OPS FSI Facility
OTL; AK, HSSEE Env Adv East; Loader, Neil; AK, OPS FS3 Facility OTL; AK, OPS FS3 OSM;
AK, OPS GPMA Facility OTL; AK, OPS GPMA OSM; AK, OPS PCC EOC TL
Subject: Gas flaring events at GC1, FS110 LPC
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
iennifer hunte.alaska.gov dave robv@alaska.gov victoria ferguson(c alaska gov
From: Kellie Okonek, GPB Production Optimization Team Leader
A flaring event occurred at FSI starting at 15/2014 02:17
nd stopping
/15/2014 02:56
th a volume of
(MSCF). The event had a volume greater than 5000 (MSCF), ! riO
and was"flaring for the field" due d a othe CGF b oster833
shutdown.
A flaring event at FS1 starting at 10/10/2014 16:50 and stopping at 10/1012014 17:50 with a volume of 71254 (MSCF).
The event had a volume greater than 5000 (MSCF), and was due to shutdown/depressure of 12B commonline for planned
maintenance.
A flaring event at FS1 starting at 10/04/2014 14:00 and stopping at 10/04/2014 15:45 with a volume of 378 (MSCF). The
event lasted for 105 minutes, and was due to LPS T/C 1804 crank spin for planned waterwash.
A flaring event at FSI starting at 10/02/2014 15:50 and stopping at 10/02/2014 17:45 with a volume of 878 (MSCF). The
event lasted for 115 minutes, and was due to LPS T/C 1804 spin cooling for planned waterwash.
A flaring event at FS1 starting at 10/02/2014 08:35 and stopping at 10/02/2014 10:20 with a volume of 583 (MSCF). The
event lasted for 105 minutes, and was due to LPS T/C 1803 crank spin for planned waterwash.
A flaring event at FS1 starting at 10/01/2014 00:45 and stopping at 10/01/2014 03:15 with a volume of 1120 (MSCF). The
event lasted for 150 minutes, and was due to LPS T/C 1803 spin cooling for planned waterwash.
A flaring event at LPC starting at 10/14/2014 00:00 and stopping at 10/1412014 12:16 with a volume of 5170 (MSCF). The
event was a black smoke event. The event lasted for 736 minutes. The event had a volume greater than 5000 (MSCF),
and was due to depressurization for RGI (residue gas injection) line for planned maintenance.
A flaring event at LPC starting at 10/13/2014 21:32 and stopping at 10/14/2014 with a volume of 4208 (MSCF). The event
was a black smoke event. The event lasted for 148 minutes, and was due to depressurization of the 24" commonline for
planned maintenance.
A flaring event at LPC starting at 10113/2014 20:29 and stopping at 10/13/2014 20:33 with a volume of 214 (MSCF). The
event was a black smoke event, and was due to 1807 injection compressor s/d and depressure for RGI maintenance.
A flaring event at GC1 starting at 10/06/2014 01:19 and stopping at 10/06/2014 10:02 with a volume of 406 (MSCF). The
event lasted for 523 minutes, and was due to depressurization of G-44 for planned maintenance.
A flaring event at GC1 starting at 10/05/2014 01:25 and stopping at 10105/2014 03:32 with a volume of 1650 (MSCF). The
event lasted for 127 minutes, and was due to depressurization of PM2 LDF in support of planned pigging activities.
A flaring event at GC1 starting at 10/03/2014 08:00 and stopping at 10/03/2014 16:00 with a volume of 1820 (MSCF). The
event lasted for 480 minutes, and was due to depressurization of PM2 LDF in support of planned pigging activities.
A flaring event at GC1 starting at 09129/2014 00:10 and stopping at 09/29/2014 03:00 with a volume of 560 (MSCF). The
event lasted for 170 minutes, and was due to high transit gas pressure flaring.
A flaring event at GCI starting at 09/28/2014 14:20 and stopping at 09/28/2014 18:30 with a volume of 290 (MSCF). The
event lasted for 250 minutes, and was due to depressurization of PM2 LDF in support of planned pigging activities.
A flaring event at FS3 starting at 10/01/2014 15:35 and stopping at 10/01/2014 17:15 with a volume of 405 (MSCF). The
event lasted for 100 minutes, and was due to LPS T/C 1804 spin cooling for planned waterwash.
A flaring event at FS3 starting at 09/29/2014 15:00 and stopping at 09/29/2014 16:30 with a volume of 470 (MSCF). The
event lasted for 90 minutes, LPS T/C 1803 crank spin for planned waterwash.
A flaring event at FS3 starting at 09/28/2014 01:10 and stopping at 09/28/2014 03:10 with a volume of 868 (MSCF). The
event lasted for 120 minutes, and was due to LPS T/C 1803 spin cooling for planned waterwash
A flaring event at FS3 starting at 09/28/2014 01:10 and stopping at 09/28/2014 03:10 with a volume of 60 (MSCF). The
event lasted for 120 minutes, and was due to LPS T/C 1803 depressurization for waterwash.
Please let me know if you have any questions.
Kellie Okonek
PCC/EOC Production Optimization TL
office: (907) 659-4472
Cell: (907) 382-1370
akoosacceoctl bo.com
Hunt, Jennifer L (DOA
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj
Sent: Sunday, October 19, 2014 8:59 AM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur,
Gregory; AK, HSSEE Env Adv West; Kruger, Dale O; Hauger, Wayne A; Burgess, David H;
AK, HSSEE Env Adv East; Loader, Neil; AK, OPS FS3 Facility OTL; AK, OPS FS3 OSM; AK,
OPS GC3 Facility & Field OTL' OPS GC3&PCC OSM; AK, OPS PCC EOC TL
Subject: Gas flaring events at GC3
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
iennifer hunt(a)alaska.00v dave.robv@alaska.gov victoria ferouson(dalaska aov
From: Kellie Okonek, GPB Production Optimization Team Leader
A flaring event occurred at GC3 starting at 10/18/2014 14:13 and stopping at 10/18/2014 23:40 with a volume of 1260
(MSCF). The event lasted for 567 minutes, and was due to spin cooling of K-7001 LPS compressor for water washing and
planned maintenance.
A flaring event occurred at GC3 starting at 10/17/2014 15:30 and stopping at 10/17/2014 16:58 with a volume of 56833
(MSCF). The event lasted for 88 minutes. The event had a volume greater than 5000 (MSCF), and was due to
depressurization of X -pad for planned maintenance.
A flaring event occurred at GC3 starting at 10/16/2014 16:00 and stopping at 10/16/2014 22:58 with a volume of 1140
(MSCF). The event was a black smoke event. The event lasted for 418 minutes, and was due to spin cooling of K-7000
LPS compressor for water wash.
A flaring event occurred t FS3 starting
at
115/2014
of 415
(MSCF). The event lasted forr 90 minutes, lanndwas 0
due o1802 S2 and STV//lP turbine 0 l
rbi eshu dn
o due to IP 21 con6:32 with atrtrol issues.
Flaring stopped when machine re -started.
Please let me know if you have any questions.
Kellie Okonek
PCC/EOC Production Optimization TL
Office: (907) 659-4472
Cell: (907) 382-1370
akopspcceoctl@bo.com
Hunt, Jennifer L (DOA
From: AK, OPS PCC EOC TL (AKOPSPCCEOCTL@bp.comj
Sent: Tuesday, October 28, 2014 9:48 AM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur,
Gregory; Loader, Neil; AK, HSSEE Env Adv East; AK, OPS FS3 OSM; AK, OPS FS3 Facility
OTL; AK, OPS PCC EOC TL
Subject: Gas flaring events akff§ -�
CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
To: Jennifer Hunt, AOGCC dave.robv@alaska.gov victoria fergusonCa)alaska.gov
iennifer huntCa�alaska.gov
From: Kellie Okonek, GPB Production Optimization Team Leader
at
14
0 with a volume
(A flaring event occurred MSCF). The event lastedtfor 370 minutes at 1and 7was du/2014 e to depr:50 and essurization of 13D aommonliine for planned of 186
maintenance.
Please let me know if you have any questions.
Kellie Okonek
PCC/EOC Production Optimization TL
Office: (907) 659-4472
Cell: (907) 382-1370
akopspcceoctl(@bp.com
REUM" `w
DEC 16 2014
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSIONCGOC
r...11 iT./ ocono r rnC panni IrFn GAS DISPOSITION
Form 10-422 Rev. 5/2009
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
Jennifer L
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Saturday, November 15, 2014 7:33 AM
Sent: Hunt, Jennifer L (DOA)
To: Loepp,, Gregory; AK, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Cc ArthurHSSEE Env Adv East; AK, OPS PGC EOC TL
dm
Subject: Gas flaring events at FS1, LPC, an
To: Jennifer Hunt, AOGCC
CC: Dave Roby, AOGCC
CC: Victoria Ferguson,
victoria ferouson(@alaska a
AOGCC a.,,,= roh���alaska.00v
iennifer huntealaska.gOv
ov
From: Wendy Hiester, GPB Production Optimization Team Leader
occre1/2014
stopp
ng at 11/11/2014 14:30 with a volume
A flaring evenThe evtlast lasted 0 minutes, ll0
starting at and wasdueto as mokeldetection trip of the 802 compressor. of
205 (MSCF) en
Flaring stopped when the compressor was restarted.
Flaring events during restart of LPC following maintenance outage:
A flSCF).ing at
The event lasted for 222 minutes a d was due to 14 00:53 and process upset/me of
while starting the plant
5 (M
Flaring stopped when the process was adjusted as needed.
ing at ng at
14
4:56 with a
A flaring
event
at LPC
event lasted for 18/minutes and 14 wasndueoto STV/IP compressor orshutdo n on low
of
137 ( )
suction pressure while starting the plant. Flaring stopped when the STV/IP compressor was restarted.
volume
v
A flaring event at LPC starting at 10/28/2014 04:49 and stopping at 10/28/2014 d by 05:21 with a volume of
254 minutes and was due to rocess upset cause
entering he plant. Flaring stopped when the plant process was adjusted as needed. a a fluid slug
volume of
14 08:45
stopping at 10/28/2014 10:00 with
F). The event lasted for g75 minutes and nd was duet
(event at FS3 at o shutdown of the 1802 compressor for unplanned
5
(MSC
)
maintenance. Flaring stopped when maintenance was completed.
Please let me know if you have any questions.
Wendy Hiester (alt. Kellie Okonek)
PCC/EOC Production Optimization TL
extecell:r(907) 227-7144 Har59 4472mony / 5566 60C)
758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akoosocceoctlPbo.com
p Pi a..® W. . s—
JAN 16 2015
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION AOGCC
__..__. - ......., r.r!!. rkonn, irr-n rA-q nISPOSITION
Form 10-422 Rev. 512009
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
or [AYWRAIIUN (AI bJ ) INL.
PRUDHOE BAY UNIT - FS -3
GAS FLARING INCIDENT REPORT
December 2014
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
12/5/2014 2135-2145 260 Not required for unplanned events <=1 hr Not required for unplanned events <= 1 hr
12/15/2014 0426-0452 189
TOTAL 449
See attachments
See attachments
TOTAL
0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
12/5/2014 0800-0810
3 See attachments
See attachments
12/6/2014 1235-1245
3
12/16/2014 0947-1007
9,167
12/19/2014 0838-0915
182
TOTAL
9,355
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
12/5/2014 0745-2110
3,755 See attachments
See attachments
12/9/2014 1235-1400
415
TOTAL
4,170
TOTAL
Unplanned Events < 1 Hour
449
Unplanned Events > 1 Hour
0
Planned Events < 1 hour and not
9,355
exceeding 5,000 MCF
Planned Events> 1 hour or
4,170
exceeding 5,000 MCF
Pilot Purge
19,045
Assist
11,025.
TOTAL FLARED VOLUME
44,044
Page 5
1/14/2015
10:49 AM