Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPBU GC 1 Gas DispositionState of Alaska AOGCC Gas Disposition Files Year: 2014 Facility: PBU GC 1 Operator: BP EXPLORATION (ALASKA) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000031 2. Facility Name PBU GC 1 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition January -2014 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold O Pool Name Pool Code Percent 7. Reinjected O PRUDHOE 640150 99.83% LISBURNE 640144 0.00% 8. Flared or vented 1 hour or less 460 MIDNIGHT SUN 640158 0.17% PT MCINTYRE 640180 0.00% 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 55,880 11. Assist Gas 0 12. Fuel gas used in lease operations. 784,618 13. Other (see instructions) Q Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 840,958 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: 0 18. Transferred to: (Express as a negative #) CGF -74,007,402 Commissioner Date 19, Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. An�� Note: All volumes must be corrected Signature & Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date Alli AAC25.235. Form 19-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000031 2. Facility Name PBU GC 1 3. Field PBU - WOA 4. Operator BP 5. MonthfYear of Disposition I February -2014 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected PRUDHOE 640150 99.76% LISBURNE 640144 0.00% 8. Flared or vented 1 hour or less 700 MIDNIGHT SUN 640158 0.24% PTMCINTYRE 640180 0.00% 9. Flared or vented more than 1 hour (see instr.) 2,056 10. Pilot and Purge 49,861 11. Assist Gas 0 12. Fuel gas used in lease operations. 732,674 13. Other (see instructions) Official Use Only Authorization >1 hr. Safety _ E, MCF 14. TOTAL VOLUME (ITEMS 6-12) 785,291 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: 0 Commissioner Date 18. Transferred to: (Express as a negative #) CGF-65,126,671 19. Remarks: I hereby certify that the foregoing is trueandcorrect to the best of my knowledge. adoM, Nate: All volumes must be corrected Signature_ Lf Title Mana er Production Taxes a d Ro allies Alaska to pressure of 14.65 psia and to a j temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (507) 554-5775 Date / AAC25.235. 1/L)- &/3/f4 - Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate 2/2/2014 2/4/2014 2/6/2014 2/12/2014 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT February 2014 I snit VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 0725-0735 110 Not required for unplanned events <=1 hr Not required for unplanned events <=1 hr 1416-1422 20 0330-0350 370 1650-1702 200 TOTAL 700 vnc i irv¢ VULUMt DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 2/3/2014 1520-1800 260 See attachments See attachments 2/17/2014 0900-2400 320 2/28/2014 2250-2359 1,476 TOTAL 2,056 Planned Events Less Than or Equal 1 Hour AND <= 5.000 mcf TOTAL 0 ¢ 1 Hour OR > 5.000 mef TOTAL Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME N TOTAL 700 2,056 0 0 49,861 0 52,617 DESCRIPTION OF IN See attachments DESCRIPTION OF INCIDENT See attachments See attachments ACTION TAKEN TO E See attachments Page 1 3/14/2014 2:10 PM Flare StartDate 02/01/2014 Flare End Date 02/28/2014 GCI Flare Report Total Volume(MSCF) 2756 Report Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 14-18 Flare Relief 02/03/2014 3:20:00 pm 6:00:00 pm 160 min Yes No No BP1\SPRINGG 260 Determination Cause Starting/stopping (purging) GLT-3300 Action Taken Up and running 14-53 Flare Relief 02/17/2014 9:00:00 am 12:00:00 am 900 min Yes No No BP1\SELFJR 320 Determination Cause 404 pletpcm problems caused stop production Action Taken Problem was found and repaired as needed plant started back on line 14-63 Flare Relief 02/28/2014 10:50:00 pm 11:59:00 pm 69 min Yes No No BPI\SPRINGG 1476 Determination Cause Swapped machines @ CGF. High transit pressure- D -1st stage Oaring Action Taken Transit pressure decreased Total Volume (MSCF) 2756 Generated 03/04/2014 2:15:08PM Page 7 of 9 Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj Sent: Tuesday, February 04, 2014 1:00 PM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; AK, HSSEE Env Adv West Subject: Gas flaring event at GC1 To: Jennifer Hunt, AOGCC iennifer. hunt(cbalaska.gov CC: Dave Roby, AOGCC dave.roby(a)alaska.Oov From: Travis Rybicki, GPB Production Optimization Team Leader CC: Victoria Ferguson, AOGCC victoria.ferg uson0alaska. aov A flaring event occurred at GCI starting at 02/03/2014 15:20 and stopping at 02/03/2014 18:00 with a volume of 260 (MSCF). The intermittent event lasted for 160 minutes. Flaring occurred during the start/stop/purge cycle for the T/C 3300 GLT Compressor. Flaring continued during this operations work. Flaring ended when the work was complete. Please let me know if you have any questions. Travis M. Rybicki PCC-EOC (Production Optimization) Team Lead Office 907-659-4472 (BOC) 659-5566 (PBOC) Cell 907-748-2118 Harmony758-4404 GPB Pager 907-659-5272 # 1890 akopspcceoctlCO((7bp. com Alternate: Kellie Okonek Hunt, Jennifer L (DOA From: AK, OPS PCC EOC TL (AKOPSPCCEOCTL@bp.com) Sent: Tuesday, February 18, 2014 9:50 AM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, OPS GC1 Facility OTL; AK, HSSEE Env Adv West; AK, OPS GC1 OSM Subject: Gas flaring events at GC1 To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC iennifer.huntODalaska.gov, dave.robv(o)alaska.gov victoria.ferauson(aalaska.gov From: Kellie Okonek, GPB Production Optimization Team Leader A flaring event occurred at GC1 starting at 02/17/2014 09:00 and stopping at 02/18/2014 with a volume of 320 (MSCF). The event lasted for 900 minutes and was due to a PLC failure in the produced water system that cascaded to a plant - wide "stop production." Rates were reduced and flaring stopped when the plant started back up. Please let me know if you have any questions. Kellie Okonek (alt. Travis Rybicki) PCC/EOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akopspcceoctl(dbp.com Hunt Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Tuesday, March 04, 2014 1:41 PM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; AK, HSSEE Env Adv West Subject: Gas flaring event at GC1 To: Jennifer Hunt, AOGCC Lnifer hunt(�Dalaska.gov CC: Dave Roby, AOGCC dave robs( alaska.gov From: Travis Rybicki, GPB Production Optimization Team Leader CC: Victoria Ferguson, AOGCC victoria.ferguson@alaska.gov alaska.gov A flaring event occurred at GC1 starting at 02/2812014 22:50 and stopping at 02/28/2014 23:59 with a volume of 1476 (MSCF). The intermittent event lasted for 69 minutes. Flaring occurred during an increase in the gas transit line pressure associated with ongoing work at the gas plants, resulting in flaring at GC1. Flaring ended when the gas transit gas pressure returned to normal operating range. Please let me know if you have any questions. Travis M. Rybicki PCC-EOC (Production Optimization) ream Lead Office 907-659-4472 (BOC) 659-5566 (PBOC) Cell 907-748-2118 Harmony 755-4404 GPB Pager 907-659-5272 # 1890 akopspcceoctICcDbp COM Alternate: Kellie Okonek STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000031 2. Facility Name PBU GC 1 3. Field PBU - WOA 4. Operator BP i. Month/Year of Disposition March -2014 Disposition Volume MCF 20. For Production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold Pool Name PoolCode Percent 7. Reinjected U PRUDHOE 640150 99.89% LISBURNE 640144 0.00% 8. Flared or vented hour or less 4,410 MIDNIGHT SUN 640158 0.11% PT MCINTYRE 640180 0.00% 9. Flared or vented more than 1 hour (see instr.) 3,340 10. Pilot and Purge 57,486 11. Assist Gas 0 12. Fuel gas used in lease operations. 794,080 13. Other (see instructions) 0 Official Use Only Authorization > 1 hr: Safety 7 `!1O 331C MCF 74. TOTAL VOLUME (ITEMS 6.12) 859,316 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas O Waste: MCF 17. Transferred from: 0 1 Commissioner (� Date 18. Transferred to: (Express as a negative #) CGF-73,039,834 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. LVB� Note: All volumes must be corrected Signature Title Mana er Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date 411114 AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT March 2014 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT& CAUSE ACTION TAKEN TO ELIMINATE CAUSE 3/1/2014 1725-1800 580 Not required for unplanned events <=1 hr Not required for unplanned events <= 1 hr 3/4/2014 1640-1652 320 3/8/2014 1621-1630 40 3/11/2014 1712-1740 190 3/15/2014 0747-0752 140 3/15/2014 2303-2359 240 3/16/2014 1530-1545 300 3/18/2014 0630-0650 150 3/19/2014 0550-0559 280 3/29/2014 0750-0837 2,170 TIME TOTAL 4,410 DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 3/13/2014 0001-2359 260 See attachments See attachments 3/14/2014 0330-0805 270 3/16/2014 0001-0145 200 3/17/2014 0715-2300 1,190 3/18/2014 1230-1345 180 3/28/2014 0240-0720 970 TOTAL 3,070 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 3/12/2014 1830-2000 270 See attachments See attachments TOTAL 270 Page 7 4/11/2014 10:03 AM 8P EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT March 2014 Page 8 4/11/2014 10:03 AM TOTAL Unplanned Events <1 Hour 4,410 Unplanned Events > 1 Hour 3,070 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 270 exceeding 5,000 MCF Pilot Purge 57,486 Assist 0 TOTAL FLARED VOLUME 65,236 Page 8 4/11/2014 10:03 AM Flare Start Date 03/01/2014 Flare End Date 03/31/2014 GC1 Flare Report Total Volume (MSCF) 7750 Report Numbs System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 14-76 Flare Relief 03/12/2014 6:30:00 pm 8:00:00 pm 90 min No No Yes BPI WIATTRR 270 Determination Cause Swapping GI-Tcompressors k-3200 and k-3300 Action Taken Flaring stopped when K-3200 online and K-3300 shutdown. 14-79 Flare Relief 03/13/2014 12:01:00 am 11:59:00 pm 1438 min Yes No No BP1\MATTRR 260 Determination Cause Flaring off of V-136 during gas swings Action Taken Evening out the gas swings 14-82 Flare Relief 03/14/2014 3:30:00 am 8:05:00 am 275 min Yes No No BP1WATTRR 270 Determination Cause Flaring off of V-136 during gas rate swings Action Taken Flaring stopped when gas rate steadied. 14-85 Flare Relief 03/16/2014 12:01:00 am 14500 am 104 min No No No BP1\MATTRR 200 Determination Cause Flaring due to high transit gas pressure. Action Taken Flaring stopped when gas transit line pressure came down. Generated 04/07/2014 10:21:34AM Page 7 of 9 Flare StartDate 03/01/2014 Flare End Date 03/31/2014 14-87 Flare Relief 03/17/2014 7:15.00 am 11:00:00 pm 945 min Yes Determination Cause Flaring off of V-138 during gas flow swings Action Taken Evening out IP gas flows No No BPI\NIATTRR 1190 14-91 Flare Relief 03/18/2014 12:30:00 pm 1:45:00 pm 75 min Yes No No Determination Cause Flaring off of V-138, K-108 lost forward flow Action Taken Flaring stopped when K-108 established forward flow. 14-97 Flare Relief 03/2812014 2:40:00 am 7:20:00 am 280 min Yes No No Determination Cause low gas rates Action Taken put gas compressor recycle in manual BP1\MATTRR 180 BP1\SPRINGG 970 Total Volume (MSCF) 7750 Generated 04/07/2014 10:21:34AM Page 8 of 9 Hunt, Jennifer L (DOA From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj Sent: Saturday, March 15, 2014 10:11 AM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, HSSEE Env Adv West; AK, OPS PCC EOC TL; AK, OPS FS3 OSM; AK, OPS FS3 Facility OTL; AK, OPS GC1 OSM; AK, OPS GC1 Facility OTL; AK, OPS CGF OTL; AK, OPS CCP CGF OSM; AK, HSSEE Env Adv Central; AK, HSSEE Env Adv East; AK, OPS FS1 OSM; AK, OPS FS1 Facility OTL; Burgess, David H; Hauger, Wayne A Subject: Gas flaring events at FS30W, CGF, FS1 To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC iennifer.huntl alaska.gov dave.roby(dalaska.00v victoria.ferouson(a)alaska.00v From: Kellie Okonek, GPB Production Optimization Team Leader A flaring event occurred at FS3 starting at 03/14/2014 07:12 and stopping at 03/14/2014 08:30 with a volume of 104 (MSCF). The event lasted for 78 minutes, and was due to additional depressure for 13D for anchor chop. A flaring event occurred at FS3 starting at 03/13/2014 07:21 and stopping at 03/13/2014 08:30 with a volume of 105 (MSCF). The event lasted for 69 minutes, and was due to additional depressure for 13D for anchor chop. A flaring event occurred at FS3 starting at 03/11/2014 09:58 and stopping at 03/11/2014 16:05 with a volume of 103 (MSCF). The event lasted for 367 minutes and was due to 13D commonline depressure for anchor chop. Flaring stopped when depressure was complete. A flaring event occurred at GC1 starting at 03/14/2014 03:30 and stopping at 03/14/2014 08:05 with a volume of 270 (MSCF). The event lasted for 275 minutes, and was due to flaring off of V-136 during gas rate swings. Flaring stopped when gas rate steaded. A flaring event occurred at GC1 starting at 03/13/2014 00:01 and stopping at 03/13/2014 23:59 with a volume of 260 (MSCF). The event lasted for 1438 minutes, and was due to flaring off of V-136 during gas rate swings. Flaring stopped when gas rate steaded. A flaring event occurred at GC1 starting at 03/12/2014 18:30 and stopping at 03/12/2014 20:00 with a volume of 270 (MSCF). The event lasted for 90 minutes, and was due to swapping of GLT compressors. Flaring stopped when K3200 was online and K3300 shut down. A flaring event occurred at CGF starting at 03/10/2014 01:19 and stopping at 03/10/2014 03:08 with a volume of 387 (MSCF). The event lasted for 109 minutes, and was due to T/C 1805 shutdown due to control/instrumentation failure associated with vibration card. Flaring stopped when equipment was re -started. A flaring event occurred at FSI starting at 03/05/2014 06:31 and stopping at 03/05/2014 18:50 with a volume of 739 (MSCF). The event was a black smoke event. The event lasted for 739 minutes, and was due to 1802 s/d for planned boroscope. Flaring stopped when job was complete and compressor re -started. Please let me know if you have any questions. Kellie Okonek (alt. Travis Rybicki) PCC/EOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) Hunt Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Tuesday, April 01, 2014 1:55 PM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; AK, HSSEE Env Adv West Subject: Gas flaring events at GCI To: Jennifer Hunt, AOGCC iennifer. hunt(a2alaska.gov CC: Dave Roby, AOGCC dave.roby(o)alaska.gov From: Travis Rybicki, GPB Production Optimization Team Leader CC: Victoria Ferguson, AOGCC victoria. fern u so n (aha laska. g ov A flaring event occurred at GC1 starting at 03/16/2014 00:01 and stopping at 03/16/2014 01:45 with a volume of 200 (MSCF). The event lasted for 104 minutes. Flaring occurred due to high transit gas pressure. Flaring continued until gas transit pressure was reduced, ending when flare valves closed. A flaring event occurred at GC1 starting at 03/17/2014 07:15 and stopping at 03/17/2014 23:00 with a volume of 1190 (MSCF). The intermittent event lasted for 945 minutes. Flaring occurred due to low gas rate swings in the plant, causing flaring off of V-136 from the IP system. Flaring continued until gas rates evened out in the IP system, ending when flare valves closed. A flaring event occurred at GC1 starting at 03/18/2014 12:30 and stopping at 03/18/2014 13:45 with a volume of 180 (MSCF). The intermittent event lasted for 75 minutes. Flaring occurred due to flaring off of V-136 when K-108 lost forward flow. Flaring continued until forward flow re-established in K-108, ending when flare valves closed. A flaring event occurred at GC1 starting at 03/28/2014 02:40 and stopping at 03/28/2014 07:20 with a volume of 970 (MSCF). The intermittent event lasted for 280 minutes. Flaring occurred due to low gas rate swings in the plant, causing flaring off of V-136 from the IP system. Flaring continued until gas rates evened out in the IP system, ending when flare valves closed. Please let me know if you have any questions. Travis M. Rybicki PCC-EOC (Production Optimization) Team Lead Office 907659-4472 (BOC) 659-5566 (PBOC) Cell 907-748-2118 Harmony 758-4404 GPB Pager 907-659-5272 # 1890 akoospcceoctlnabp. com Alternate: Kellie Okonek STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000031 2. Facility Name PBU GC 1 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition April -2014 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 99.94°/a LISBURNE 640144 0.00% 8. Flared or ventedlhour or less 3279 MIDNIGHTSUN 640158 0.06% PT MCINTYRE 640180 0.00% 9. Flared or vented more than 1 hour (see instr.) 6,048 10. Pilot and Purge 56,070 11. Assist Gas 0 12. Fuel gas used in lease operations. 873,073 13. Other (see instructions) 0 Official Use Only Authorization >i hr: Safety� 6 � MCF 14. TOTAL VOLUME (ITEMS 6.12) 938,470 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 18. Transferred to: (Express as a negative #) CGF -67,947,491 Commissioner Date 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. ��Mp Note: All volumes must be corrected Signature liUf U' ( Title Manager Production Taxes and Ro allies Alaska to pressure of 14.65 psia and to a j temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date AAC25.235. (%L /_ 6) 24h 4 Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (AucsKA( IM. PRUDHOE BAY UNIT -GC -1 GAS FLARING INCIDENT REPORT April 2014 Page 6 DATE 4/3/2014 UMe 0000-0009 _.... _.__...__-_- 1,639 Not required for unplanned events <=1 hr Not required for unplanned events <=1 hr 4/8/2014 1145-1153 210 350 4/10/2014 2115-2145 290 0 4/14/2014 2350-2358 630 56,070 4/23/2014 1222-1228 160 65,397 5/15/2014 TOTAL 2,929 Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 4/1/2014 1240-2215 4,148 See attachments See attachments 4/20/2014 0800-0920 1,900 TOTAL 6,048 4/16/2014 2305-2330 350 See attachments aee attacnmenu TOTAL 350 Planned Events Exceeding 1 Hour OR > 5,000 mcf rnnu rAxEN Tn ELIMINATE CAUSE See attachments TOTAL 0 See attachments 10:51 AM TOTAL Unplanned Events <1 Hour 2,929 Unplanned Events > 1 Hour 6,048 Planned Events < 1 hour and not 350 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 56,070 Assist 0 TOTAL FLARED VOLUME 65,397 5/15/2014 10:51 AM Flare Start Date 04/01/2014 Flare End Date 04/30/2014 GC1 Flare Report Total Volume (MSCF) 9327 Report Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume No No BPIVSPRINGG 4148 14-105 Flare Relief 04/01/2014 12:40:00 pm 10:15:00 pm 575 min Yes ., Determination Cause LP and IP compression systems not capable of preventing LP/IP flaring at reduced oil rate. Estimated volume based on FQI-7446T. Action Taken Need more rate — -- ---- ----- -- 14-127 Flare Relief 04/16/2014 11:05:00 pm 11:30:00 pm 25 min No No Yes BP1lFUELMO 350 Determination Cause Depressured GLT-3300 to flare. Action Taken GLT-3300 is now depressured. - 14-131 Flare Relief 04/20/2014 8:00:00 am 9:20:00 am 80 min Yes No No BP1tFUELMO 1900 Determination cause Lost GLT machines due to power supply issue. Action Taken GLT's back up and running - -- -- --- Total Volume (MSCF) 9327 Page 6 of 9 Generated 05/05/2014 10:32:25AM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000031 2. Facility Name PBU GC 1 3. Field PBU - WOA 4. Operator BP 5. MonthlYear of Disposition Ma -2014 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 99.88% LISBURNE 640144 0.00°/ 8. Flared or vented 1 hour or less 3,133 MIDNIGHT SUN 640158 0.12% PT MCINTVRE 640180 0.00% 9. Flared or vented more than 1 hour (see instr.) 11,653 10. Pilot and Purge 57,329 11. Assist Gas 0 12. Fuel gas used in lease operations. 881,013 13. Other (see instructions) 01Authorization Official Use Only >I hr Safety -5 MCF 14. TOTAL VOLUME (ITEMS 6-12) 953,128 Lease Use MCF 15. NGL Gas Equivalent 0 Conserva8on MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 G -2.4 _ 18. Transferred to: (Express as a negative #) CGF -57,802,500 Commissioner Date 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. ,1 ///�� CAW Signature b g K. l/�(� W Title Manager Production Taxes and Royalties Alaska Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Diane Colley Phone (907) 564-5775 Date d/s/4 �/a6/lq Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT May 2014 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 5/3/2014 1201-1210 553 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr 5/8/2014 1600-1645 1,390 5/11/2014 1730-1745 780 5/27/2014 0936-0939 170 5/27/2014 1303-1306 100 TOTAL 2,993 5/2/2014 1735-2335 4,160 See attachments 5/4/2014 1008-2050 3,026 5/5/2014 0205-0747 620 5/6/2014 0245-1600 403 5/23/2014 0948-1600 2,907 TOTAL 11,116 ACTION TAKEN TO ELIMINATE CAUSE See attachments Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 5/22/2014 1525-1615 30 See attachments See attachments 5/25/2014 0546-0547 10 5/25/2014 1234-1239 100 TOTAL 140 Events Exceeding 1 Hour OR > 5/24/2014 1434-1620 TOTAL Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME 537 See attachments 537 TOTAL 2,993 11,116 140 537 57,329 72,115 See attachments Page 7 6/1212014 10:40 AM Flare StartDate 05/01/2014 Flare End Date 05/31/2014 GCI Flare Report Total Volume (MSCF) 14786 Report Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 14-143 Flare Relief 05/02/2014 5:35:00 pm 11:35:00 pm 360 min Yes No No BP1\SPRINGG 4160 Determination Cause Lost Annex (SSR) Estimated volume based on FQI-7446T. Action Taken Restarted Annex 14-149 Flare Relief 05/04/2014 10:08:00 am 8:50:00 pm 642 min Yes No No BP11SPRINGG 3026 Determination Cause GC1 oil rate decreases to 55 mbpd and lower. LP and IP compression systems not capable of preventing LP/IP Flaring at reduced oil rate. I Action Taken Waiting for GCI oil rate to stabilize above 55 mbopd 14-151 Flare Relief 05/05/2014 2:05:00 am 7:47:00 am 342 min Yes No No BPi\SPRINGG 620 Determination Cause GC1 ail rate decreases to 55 mbpd and lower. LP and IP compression systems not capable of preventing LP/IP Baring at reduced oil rate Action Taken Waiting for rate to increase 14-154 Flare Relief 05/06/2014 2:45:00 am 4:00:00 pm 795 min Yes No No BP1\SPRINGG 403 Determination Cause GC1 oil rate decreases to 55 ril and lower. LP and IP compression systems not capable of preventing LP/IP Flaring at reduced oil rate Action Taken waiting for rate 14-170 Flare Relief 05/22/2014 3:25:00 pm 4:15:00 pm 50 min Yes Determination Cause S/D& depressured K7000 for water wash Action Taken depressured 14-174 Flare Relief 05/23/2014 9:48:00 am 4:00:00 pm 372 min Yes Determination Cause Lost gc-2 to annex Action Taken BIS No Yes BP1\SPRINGG 30 IM No BP1\SPRINGG 2907 Generated 06/03/2014 9:13:32AM Page 7 of 10 Flare StartDate 05/01/2014 Flare End Date 05/31/2014 14-176 Other 05/24/2014 2:34:00 pm 4:20:00 pm 106 min Yes No Yes BPIUONESCC 537 Determination Cause GTRB-01-7000 Water -Wash. Action Taken Water -Wash complete. 14-178 Controlled Blowdown 05/25/2014 5:46:00 am 5:47:00 am 1 min No No Yes BPIUONESCC 10 Determination Cause Depressured K-7001. Action Taken Compressor depressured. _ 14-178 Controlled Blowdown 05/25/2014 12:34:00 pm 12:39:00 pm 5 min No No Yes BPIUONESCC 100 Determination Cause Depressured A-Slugcatcher. Action Taken A-Slugcatcher depressured. Total Volume (MSCF) 14786 Generated 06/03/2014 9:13:32AM Page 8 of 10 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000031 2. Facility Name PBU GC 1 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition June -2014 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold Pool Name PoolCode Percent 7. Reinjected 0 PRUDHOE 640150 99.83°/ LISBURNE e40144 0.00% 8. Flared or vented 1 hour or less 3 ,230 MIDNIGHTSUN 640158 0.17% PT MCINTYRE 640180 0.00% 9. Flared or vented more than 1 hour (see instr.) 13,161 10. Pilot and Purge 55,557 11, Assist Gas 0 12. Fuel gas used in lease operations. 743,504 13. Other (see instructions) p Official Use Only Authorization -1 hr. Safety �/� � MCF 14. TOTAL VOLUME (ITEMS 6.12) 815,452 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation o -7 Zf MCF 16. Purchased gas OMCF Waste: 17. Transferred from: Commissioner Date 18. Transferred to: (Express as a negative #) CGF -63,355,859 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature_Title Mana er Production Taxes and Royalties Alskaato pressure of 14.65psia and to a 7#04 temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235. V/ --r— gl2s)I� �`Zylw- Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate Sp EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT June 2014 aimed Events less than or equal to 1 hour DESCRIPTION OF INCIDENT &CAUSE Al I". ' .— •— -- -- Not required for unplanned events <= 1 hr TIME DATE VOLUME 735 Not required for unplanned events <= 1 hr 2,950 6/2/2014 0705-0755 260 6/7/2014 1433-1445 650 6/10/2014 2100-2115 1,015 exceeding 5,000 MCF 6/22/2014 1005-10 50 80 0 6/24/2014 0725-0728 210 0 exceeding 5,000 MCF 6/28/2014 2048-2055 _� 2,950 eL.59;S5T•• TOTAL y, „ O i 3t Assist 71,948 TOTAL FLARED VOLUME ACFION TAKEN TO ELIMINATE CAUSE planned Events greater than 1 hour VOLUME DESCRIPTION OF INCIDENT & CAVSE See attachments TIME DATE 1800-2100 1,110 See attachments 6/11/2014 0010-20 00 1,560 6/12/2014 350 6/13/2014 0001-2400 1,390 6/14/2014 0630-22 00 1,090 6/17/2014 0300-2400 2 616 LGw /-7rod 6/20/2014 0508-2400 I 6/21/2014 0000-0525 1,200 6/23/2014 1410-1545 1,437 6/25/2014 0845-1000 — i TOTAL Manned Events Less Than or Equal 1 Hour ADNIDE 5+0 �EKRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments DATE TIME 280 See attachments 6/9/2014 0938-0956 TOTAL See attachments See attachments TOTAL TOTAL 2,950 Unplanned Events < 1 Hour 13,161 Unplanned Events> 1 Hour planned Events < 1 hour and not 280 exceeding 5,000 MCF 0 Planned Events> 1 hour or exceeding 5,000 MCF eL.59;S5T•• Pilot Purge y, „ O i 3t Assist 71,948 TOTAL FLARED VOLUME Page o 711612014 1 AS PM Flare Start Date 06/0112014 Flare End Date 0613012014 Total Volume (MSCF) 16391 GC1 Flare Report Planned Reported By Volume Report System Date StartTime Stop Time Duration Intermittent Black Smoke Numbe Flare Relief 0610912014 9:38:00 am 9:56:00 am 18 min No 14-190 Determinatton Cause Depre sured GLT 3300 to flare for upcoming work. GLT 3300 was depressured and flaring stopped__ Action Taken _.--------- -- BP1\FUELMO 280 No Yes ---------------- - ----- � - No BP1\SELFJR 1110 06/11/2014 6:00:00 pm 9:00:00 pm 180 min Yes No 14-193 Flare Relief lost forward flow High Transt Gas pre ssure ip machine -- - Determination Cause off to get forwa id flow - - Ip machine recyk:e closed Action Taken -_. ---BPt\SELFJR 1580 06/1212014 12:10:00 am 8:00:00 pm 1190 min Yes No No t4-196 Flare Relief Pressure Ip lost forward flow also hi temp Determination Cause Hi trans gas ---- -" - - - - -- --- cut rate to annex ---- ------------ Moved rate around and P=_ Action Taken ---_-- --------350 BPI\SELFJR 06/1312014 12:01:00 am 12:00100 am 1439 min Yes No No 14-197 Flare Relief Lp GascOmPlOstfOmardflow Determination Cause ps-- forvvard flow on Ip gas coin Adujust Temp on Cooling Bays restabbsh Action Taken BP1\SELFJR 1390 -- No 06114/2014 6:30:00 am 1(:00:00 pm 930 min Yes No 14-199 Flare Relief 1p gas machine lost forward flow Determination Cause operations switched Ip machines put k_1 on Action Taken __ -- - ----_---� BP1\SELFJR 1090 06117/2014 3:00:00 am 12:00:00 am 1260 min Yes No No 14-202 Flare Relief flow variations due to emp changes IP machine lost forward flow due to temp and - - Determination Cause necessary adjustments — - - Operations worked wih pm and made Action Taken --,_ _ _------------- BPI\SPRINGG 2616 --- No No .- 4-205 Flare Relief 0612012014 5:06:00 am 12:00:00 am 1132 min Yes Determination Cause plus 1346 MSCF for 3rd stage flare #3 open for 3.59 hours (based on equation: GCt oil rate decreases to 55 mbpd and lower. LP and IP compression systems not capable of preventing LPIIP flaring at reduced of fate Estimated volume based on FQI-7446T. (1270 MSCF) p 9,000 MSCF times 359 hours divided by 24 hours = 1346 MSCF) - - - - _ - Waitingfor GCI oil rale to stabilize above 55 ilimbopd_ Action Taken -_ ___. ----- -- ___-- -- Page 5 Of Generated 0710912014 3:12:32PM Flare Start Date 061011201406/3012014 ept\SPRINGG 2408 Flare End Date No No .. Flare Relief 0612112014 12:00:00 am 5:25:00 am 325 min Yes 14-207 n for 4"77 hours (based on equation: fi20 MSCF) plus 1788 MSCF for 3rd stage Flare it3 open DeterTination Cause GC1 oil rate tlecreases to 55 mbpd and lower. LP and IP compression systems not capable of preventing Lp11P flaring at retlucetl of rate Estimated volume based on FQI-74467. 24 hours = 1788 MSCF) g,000 MSCF times 4.77 hours divided by Action Taken Waited for GCI oil rate to stabilize above 55 mbopd - ---------- -_ -- No BPt\SPRINGG 1200 14-211 Flare Relief 0612312014 2:10:00 pm 3:45:00 pm g5 min Yes Lost K-7000 due to blown fuse in UPS Determination Cause __"-------"---_----- - - balk upand runnin9 Action Taken ------------ _--- -- -- -- _- — BPt\SPRINGG 1437 No Flare Relief 06125/2014 8:45:00 am 10:00:00 am 7501111 Yes No 14-216 Lost A1B-banks to Annez Determination Cause _ Back inservice — ------ �-"- Action Taken_.--- - -- - Total Volume (MSCF) 16391 Page 5 of 7 Generated 014 3:12:32PM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000031 2. Facility Name PBU GC 1 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition July -2014 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sotd 0 Pool Name Pool Code Percent 7. Reinjected Q PRUDHOE 640150 99.82% LISBURNE 640144 0.003% 8. Flared or vented lhour or less 2,615 MIDNIGHT SUN 640158 0.18% PTMCINTYRE 640180 0.00% 9. Flared or vented more than 1 hour (see instr.) 52,256 10. Pilot and Purge 59,645 11. Assist Gas 0 12. Fuel gas used in lease operations. 760,776 13. Other (see instructions) O Official Use Only Authorization >1 hr: Safety L � I 2z!j MCF 14. TOTAL VOLUME (ITEMS 6-12) 675,292 Lease Use MCF 15. NGL Gas Equivalent U Conservation MCF 16. Purchased gas U Waste: MCF 17. Transferred from: 0 18. Transferred to: (Express as a nega8ve #) CGF 45,943,970 -45,943,9701 Commissioner Date 19. Remarks: oregoing is true and correct to the best of my knoviledge. I hereby certify thanacorrected Note: All volumes must be Signature Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date �' AAC25.235. VL- Form L Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate UP EXPLORATION (ALASKA) INC. PRUDHOE RAY UNIT - GC -1 GAS FLARING INCIDENT REPORT Page 7 July 2014 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 7/12/2014 2148-2232 1,700 Not required for unplanned events <=1 hr Not required for unplanned events <=1 hr 7/29/2014 1545-1605 395 7/30/2014 1458-1512 520 TOTAL 2,615 Unplanned Events greater than 1 hour TOTAL DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 7/2-3/2014 0001-0630 5,000 See attachments See attachments 7/4/2014 0600-1200 280 7/8/2014 0400-2230 940 7/17/2014 1800-2400 81170 7/18/2014 0400-2400 6,886 7/23-27/14 0000-2400 20,736 7/28/2014 0004-2335 6,633 7/29/2014 0017-2400 1,946 7/29/2014 0808-1040 925 7/30-31/14 1600-2359 740 TOTAL 52,256 TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 TOTAL FLARED VOLUME 114,516 8/14/2014 2:23 PM TOTAL Unplanned Events < 1 Hour 2,615 Unplanned Events> 1 Hour 52,256 Planned Events <1 hour and not 0 exceeding 5,000 MCF Planned Events> 1 hour or 0 exceeding 5,000 MCF Pilot Purge 59,645 Assist 0 TOTAL FLARED VOLUME 114,516 8/14/2014 2:23 PM Flare Start Date 07/01/2014 Flare End Date 07/31/2014 GC1 Flare Report Total Volume(MSCF) 64971 Report Numbs System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 14-224 Controlled Blowdown 07/02/2014 12:01:00 am 12:00:00 am 1439 min Yes No No BP7\SELFJR 3400 Determination Cause UPS POWER FAILURE TO CONTROL ROOM SKID 7 Action Taken Repair UPS Unit in skid 7 14-225 Controlled Blowdown 07/03/2014 12:01:00 am 6:30:00 am 389 min Yes No No BP1\SELFJR 1600 Determination Cause UPS power failure skid 7 Action Taken repaired skid 7 ups power unit and restart plant 14-226 Controlled Slowdown 07/04/2014 6:00:00 am 12:00:00 pm 360 min No No No BP1\SELFJR 280 Determination Cause 2nd stage D bank back pressure controller problems Action Taken Operator adjusted 2nd stage d bank pressure controller 14-231 Flare Relief 07/08/2014 4:00:00 am 10:30:00 pm 1110 min No No No BP1\SELFJR 940 Determination Cause Gas plant lost forward flow on ip machines Action Taken operations made some temperature and pressure adjustments to restablish flow 14-251 Flare Relief 07/17/2014 6.00.00 pm 12:00:00 am 360 min No No No BP1\SELFJR 8170 Determination Cause Depressure Y/P PAD LDF for safe out Action Taken Y/P PAD LDF ID DEPRESSURED FOR SAFEOT AND FLARING STOPPED 14-256 Flare Relief 07/18/2014 4:00:00 am 12:00:00 am 1200 min Yes No No BP1\SELFJR 6886 Determination Cause S/d depressure 525 ghx also GC -1 to Go -2 s/d Tieline depressure through Annex. Action Taken Flare stopped after depressured lines by closing flare valves 14-265 Flare Relief 07/23/2014 12:00:00 am 12:00:00 am 1440 min Yes No No BP1\.SPRINGG 2946 Determination Cause GC1 oil rate decreases to 55 mbpd and lower. LP and IP compression systems not capable of preventing LP/IP flaring at reduced oil rate. Action Taken Waiting for GC1 oil rate to stabilize above 55 mbopd 14-268 Flare Relief 07/24/2014 12:00:00 am 12:00:00 am 1440 min Yes No No BP1 SPRINGG 2404 Determination Cause GC1 oil rate decreases to 55 mbpd and lower. LP and IP compression systems not capable of preventing LP/IP flaring at reduced oil rate. Action Taken Waiting for GCI oil rate to stabilize above 55 mbopd 14-270 Flare Relief 07/25/2014 12:26:00 am 12:00:00 am 1414 min Yes No No BPI\SPRINGG 960 Determination Cause GC1 oil rate decreases to 55 mbpd and lower. LP and IP compression systems not capable of preventing LP/IP flaring at reduced oil rate Generated 08/04/2014 11:24:17AM Page 8 of 11 Flare StartDate 07/01/2014 Flare End Date 07/31/2014 Action Taken Waiting for GCI oil ratetostabilize above 55 mbopd 14-271 Flare Relief 07/26/2014 12:02:00 am 12:00:00 am 1438 min Yes No No BP1\SPRINGG 4402 Determination Cause GC1 oil rate decreases to 55 mbpd and lower. LP and IP compression systems not capable of preventing LP/IP flaring at reduced oil rate Action Taken Waiting for GC1 oil rate to stabilize above 55 mbopd 14-274 Flare Relief 07/27/2014 12:00:00 am 12:00.00 am 1440 min Yes No No BP7ISPRINGG 10024 Determination Cause GC1 oil rate decreases to 55 mbpd and lower. LP and IP compression systems not capable of preventing LP/IP flaring at reduced oil rate. Action Taken Waiting for GC1 oil rate to stabilize above 55 mbopd 14-275 Flare Relief 07/28/2014 12:04:00 am 11:35:00 pm 1411 min Yes No No BPIISPRINGG 6633 Determination Cause GCI oil rate decreases to 55 mbpd and lower. LP and IP compression systems not capable of preventing LP/IP flaring at reduced oil rate. Action Taken Waiting for GC1 oil rate to stabilize above 55 mbopd 14-279 Flare Relief 07/29/2014 12:17:00 am 12:00:00 am 1423 min Yes NO No BPI\SPRINGG 1945 Determination Cause GC1 oil rate decreases to 55 mbpd and lower. LP and IP compression systems not capable of preventing LP/IP flanng at reduced oil rate. Action Taken Waiting for GCI oil rate to stabilize above 55 mbopd 14-279 Controlled Blowdown 07/29/2014 8:08:00 am 10:40:00 am 152 min Yes No No BPI\SPRINGG 925 Determination Cause H20wash GLT-3200 Ar-tinn Takan 1-12o wash done 14-282 Controlled Blowdown 07/30/2014 400:00 pm 11:59:00 pm 479 min Yes No No Determination Cause Flaring off of V-136 due to K-107 losing forward Flow. Action Taken Re-established forward flow for K-107. 14-284 Controlled Blowdown 07/31/2014 12:01:00 am 11:59:00 pm 1438 min Yes No No Determination Cause Flanng Off of V-136 because K-107 loss forward flow. Action Taken Re-establishing forward flow through K-107. BP1\MATTRR 370 BP1\MATTRR 370 Total Volume (MSCF) 54871 Generated 08/04/2014 11:24:17AM Page 9 of 11 Hunt, Jennifer L (DOA From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Sunday, July 20, 2014 12:30 PM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; Kruger, Dale O; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; AK, OPS GC2 OSM; AK, OPS GC2 Facility OTL; AK, OPS GC3 Facility & Field OTL; AK, OPS GC3&PCC OSM Subject: Gas flaring events atm GC2, GC3 To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC iennifer.hunt(aalaska.gov dave.robV(oalaska.gov victoria.ferguson(aalaska.gov From: Kellie Okonek, GPB Production Optimization Team Leader GCI A flaring event occurred at GC1 starting at 06/17/2014 03:00 and stopping at 06/18/2014 with a volume of 1090 (MSCF). The event lasted for 1260 minutes, and was due to LP compressor instability due to temperature swings. Flaring stopped when necessary process changes were made. A flaring event occurred at GC1 starting at 06/20/2014 05:08 and stopping at 06/21/2014 with a volume of 2616 (MSCF). The event lasted for 1132 minutes, and was due to low oil throughput causing insufficient LP/IP gas. A flaring event occurred at GCI starting at 06/21/2014 00:00 and stopping at 06/21/2014 05:25 with a volume of 2408 (MSCF). The event lasted for 325 minutes, and was due to low oil throughput causing insufficient LP/IP gas. A flaring event occurred at GC1 starting at 06/23/2014 14:10 and stopping at 06/23/2014 15:45 with a volume of 1200 (MSCF). The event lasted for 95 minutes, and was due to a blown UPS fuse causing an LPS compressor shutdown. Flaring stopped when the compressor was re -loaded. A flaring event occurred at GCI starting at 06/25/2014 08:45 and stopping at 06/25/2014 10:00 with a volume of 1437 (MSCF). The event lasted for 75 minutes, and was due to an unplanned shutdown of A/B banks to the GC1 annex. Flaring stopped when the banks were put back in service. A flaring event occurred at GC1 starting at 07/02/2014 00:01 and stopping at 07/03/2014 with a volume of 3400 (MSCF). The event lasted for 1439 minutes, and was due to a UPS power failure to the skid 7 control room. Flaring stopped when UPS was fixed and power restored. A flaring event occurred at GC1 starting at 07/03/2014 00:01 and stopping at 07/03/2014 06:30 with a volume of 1600 (MSCF). The event lasted for 389 minutes, and was due to a UPS power failure to the skid 7 control room. Flaring stopped when UPS was fixed and power restored. A flaring event occurred at GC1 starting at 07/04/2014 06:00 and stopping at 07/04/2014 12:00 with a volume of 280 (MSCF). The event lasted for 360 minutes, and was due to 2 stage D -bank backpressure controller issues. Flaring stopped when the backpressure controller was re -adjusted. A flaring event occurred at GC1 starting at 07/08/2014 04:00 and stopping at 07/08/2014 22:30 with a volume of 940 (MSCF). The event lasted for 1110 minutes, and was due to loss of forward flow on IP compressors. Flaring stopped when temperature/pressure adjustments made to re-establish flow. A flaring event occurred at GC1 starting at 07/17/2014 18:00 and stopping at 07/18/2014 with a volume of 8170 (MSCF). The event lasted for 360 minutes. The event had a volume greater than 5000 (MSCF), and was due to depressurization of Y/P pads for safe -out. Flaring stopped when depressurization was complete. A flaring event occurred at GC1 starting at 07/18/2014 04:00 and stopping at 07/19/2014 with a volume of 6886 (MSCF). The event lasted for 1200 minutes. The event had a volume greater than 5000 (MSCF), and was due to shutdown and depressure of GHX tie -line between GC1&2 for GC2 planned turnaround. GC2 A flaring event occurred at GC2 starting at 06/23/2014 07:27 and stopping at 06/23/2014 09:16 with a volume of 606 (MSCF). The event lasted for 109 minutes, and was due to high gas transit pressure caused by an increase in ambient temperatures and EOA 1806 compressor shutdown. A flaring event occurred at GC2 starting at 07/12/2014 21:15 and stopping at 07/12/2014 22:30 with a volume of 7812 (MSCF). The event lasted for 75 minutes. The event had a volume greater than 5000 (MSCF), and was due to high ambient temperatures causing transit gas system issues. Flaring stopped when rates were cut on the EOA. GC3 A flaring event occurred at GC3 starting at 07/19/2014 14:48 and stopping at 07/19/2014 17:35 with a volume of 1160 (MSCF). The event lasted for 167 minutes, and was due to wet gas compressor shutdown due to control/instrumentation failure associated with a fault. Production was reduced to minimize flaring. Please let me know if you have any questions Kellie Okonek (alt. Travis Rybicki) PCCIEOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akopspcceoctlebp.com Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Sunday, July 27, 2014 11:47 AM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv East; Burgess, David H; AK, HSSEE Env Adv West; Kruger, Dale 0; AK, OPS GC1 OSM; AK, OPS GC1 Facility OTL; AK, OPS FS2 OSM; AK, OPS FS2 Facility OTL; AK, OPS PCC EOC TL Subject: Gas flaring events at FS2, Oft To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC iennifer.hunt(a)alaska.gov dave.robv( alaska.gov victoria.ferguson aaalaska.gov From: Kellie Okonek, GPB Production Optimization Team Leader GC1: A flaring event occurred at GC1 starting at 07/26/2014 00:02 and stopping at 07/27/2014 with a volume of 4402 (MSCF). The event lasted for 1438 minutes, and was due to low oil rate flaring from the LP/IP. A flaring event occurred at GC1 starting at 07/25/2014 00:26 and stopping at 07/26/2014 with a volume of 960 (MSCF). The event lasted for 1414 minutes, and was due to low oil rate flaring from the LP/IP. FS2: A flaring event occurred at FS2 starting at 07/26/2014 04:30 and stopping at 07/26/2014 08:30 with a volume of 10 (MSCF). The event lasted for 240 minutes, and was due to depressurization of the gas transit line due to a pig sig issue at the FSI flare manifold. Flaring stopped when line depressured. Please let me know if you have any questions. Kellie Okonek (alt. Travis Rybicki) PCC/EOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akoosocceoctl aPbo.com Hunt, Jennifer L DOA From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.Comj Sent: Tuesday, July 29, 2014 6:07 PM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv East; Burgess, David H; AK, HSSEE Env Adv West; Kruger, Dale O; AK, OPS GC1 OSM; AK, OPS GC1 Facility OTL; AK, OPS FS2 OSM; AK, OPS FS2 Facility OTL Subject: Gas flaring events at FS2, To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC iennifer hunt@alaska.gov dave.robv@alaska.gov victoria ferguson(o)alaska gov From: Kellie Okonek, GPB Production Optimization Team Leader GC1: A flaring event at GCI starting at 07/28/2014 00:04 and stopping at 07/28/2014 23:35 with a volume of 6633 (MSCF). The event lasted for 1411 minutes. The event had a volume greater than 5000 (MSCF), and was due to low oil rate flaring off the LP/IP due to reduced rates during the CGF TAR. A flaring event at GCI starting at 07/27/2014 00:00 and stopping at 07/28/2014 with a volume of 10024 (MSCF). The event lasted for 1440 minutes. The event had a volume greater than 5000 (MSCF), and was due to low oil rate flaring off the LP/IP due to reduced rates during the CGF TAR. FS2: at FS2 starting at 07/26/2014 04:30 and stopping at 07/26/2014 08:30 with a volume of 10250 (MSCF). The event lasted for 240 minutes. The event had a volume greater than 5000 (MSCF), and was due to depressurization of the gas transit line due to needed repairs at FS1. Please let me know if you have any questions. Kellie Okonek (alt. Travis Rybicki) PCC/EOC Production optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akoosocceoctlna bl2.com Hunt, Jennifer L DOA From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj Sent: Wednesday, July 30, 2014 7:06 PM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv East; Burgess, David H; AK, HSSEE Env Adv West; Kruger, Dale O; AK, OPS GC1 OSM; AK, OPS GCI Facility OTL; AK, OPS PCC EOC TL Subject: Gas flaring events aSIMAM CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC To: Jennifer Hunt, AOGCC dave roby(cilalaska.aov victoria ferauson(a)alaska.gov iennifer hunt(a alaska.00v From: Kellie Okonek, GPB Production Optimization Team Leader A flaring event occurred at GC1 starting at 07129/2014 00:17 and stopping at 07/30/2014 with a volume of 1946 (MSCF). The event lasted for 1423 minutes, due to low oil rate flaring from the LP/IP. Please let me know if you have any questions. Kellie Okonek (alt. Travis Rybicki) PCCIEOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akoosocceoctlftP corn From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj Sent: Thursday, July 31, 2014 6:42 PM Se SeHunt, Jennifer L (DOA) To: : Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary v West; Kruger, Dale O; AK, OPS GCI OSM; AK, OPS Arthur, Gregory; AK, HSSEE Env Ad GCI Facility OTL; AK, OPS PCC EOC TL Subject: Gas flaring events a@41 Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC CC: fer To: Jennifer Hunt, AOGCC h„ oby, AOGCC victoria gusonCg alaska.gov Jennifer hunt(d)alaska gov From: Kellie Okonek, GPB Production Optimization Team Leader A g event occurred at GCI starting at 0713012014 16:00 and stopping at 071 flaring 3012014 23:59 with a volume of 370 flavin. The event lasted for 479 minutes, and was due to sld of K-107 compressor. Flaring stopped when compressor was re -loaded. Please let me know if you have any questions. Kellie Okonek (alt. Travis Rybicki) PCCIEOC Production Optimization TL extecell:(907)382 18370 Harmony: 758 566 BOC) 404 Pager 574 MOA - access # 4236) or 1890 (EOA - access #5100) e-mail akOPSPCCegctlMP com Jennifer L From: Sent: To: Cc: Subject: AK, Or P-EOC TL [AKOPSPCCEOCTL@bp.comj Friday, August 01, 2014 1:51 PM Hunt, Jennifer L (DOA) Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary Arthur, GCI Facility O AK, HSSEE L; AK, OPS PEnv CC EOC West; Kruger, Dale O; AK, OPS GCI OSM; AK, OPS Gas flaring events atm To: Jennifer Hunt, AOGCC Jennifer hunigg� aska.go_v CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC davedave rob_`laska Qov victoria.ferousonCo�alaska.9ov From: Kellie Okonek, GPB Production Optimization Team Leader at 0713112014 23:59 with a volume of 370 A flaring event occurred at or 1 starting at sand w014 00:01 and stopping compressor. (MSCF). The event lasted for 1438 minutes and was due to low oil rate flaring off the LP/IP comp Please let me know if you have any questions. Kellie Okonek (alt. Travis Rybicki) PCCIEOC Production Optimization TL external: (907) 659 4472 (BOC) 15566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (VVOA - access # 4236) or 1890 (EOA - access #5100) e-mail akopspcceoctl@bp com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000031 2. Facility Name PBU GC 1 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition August -2014 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 99.73% LISBURNE 640144 0.007/. 8. Flared or vented l hour or less 3,560 MIDNIGHT SUN 640158 0.27% PT MCINTYRE 640180 0.00% 9. Flared or vented more than 1 hour (see instr.) 6,612 10. Pilot and Purge 56,750 11. Assist Gas 0 12. Fuel gas used in lease operations. 660,719 13. Other (see instructions) 0 Official Use Only Authorization>1 hr: Safety � � � Z MCF 14. TOTAL VOLUME (ITEMS 6-12) 727,641 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 18. Transferred to: (Express as a negative #) CGF -37,957,64$ Commissioner Date 19. Remarks: foregoing is to @ and correct to the best of my knowledge. I1Note: I hereby certify th61MI Signature Title Manager Production Taxes and Royalties Alaska Printed Name Diane Colley Phone (907) 564-5775 Date 46114 All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235. f vr—c Form 1OA22 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate Yr UfLV.. I... IALxbR )IRL. PRUDHOE BAY UNIT -GC -1 GAS FLARING INCIDENT REPORT August 2014 v.LVmc UE LKJPI IVN UE INLIUENI & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 8/20/2014 2202-2225 510 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr 8/21/2014 0818-0832 90 8/26/2014 2210-2239 2,420 8/27/2014 0858-0902 520 8/29/2014 0320-0338 20 TOTAL 3,560 8/1/2014 0800-1800 20 See attachments See attachments 8/2/2014 1520-1915 370 8/4/2014 1540-1805 250 8/10/2014 1951-2310 491 8/17/2014 1207-1442 390 8/23/2014 0052-0244 860 8/25/2014 1014-2011 2,501 8/29/2014 0830-0945 770 8/30/2014 1720-2100 440 8/31/2014 0000-2400 520 TOTAL 6,612 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 3,560 Unplanned Events> 1 Hour 6,612 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events> 1 hour or 0 exceeding 5,000 MCF Pilot Purge ,.. 56,750' Assist 0 TOTAL FLARED VOLUME 66,922 Page 7 9/15/2014 4.46 PM Flare StartDate 08/01/2014 Flare End Date 08/31/2014 GC1 Flare Report Total Volume(MSCF) 70172 Report Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 14-286 Controlled Blowdown 08/01/2014 8:00:00 am 6:00:00 pm 600 min Yes No No BPI WIATTRR 20 Determination Cause Flared off of V -120A because of fluctuating LP gas rates. Action Taken Once gas rate stabilized flaring stopped. 14-287 Controlled Blowdown 08/02/2014 3:20:00 pm 7:15:00 pm 235 min Yes No No BPI WIATTRR 370 Determination Cause Flared while swapping K-105 and K-106 LP compressors Action Taken Flaring stopped when K-106 stabilized, 14-288 Controlled Blowdown 08/04/2014 3:40:00 pm 6:05:00 pm 145 min Yes No No BP1\MATTRR 250 Determination Cause Flared off of V-136 when K-108 lost forward flow Action Taken Flaring stopped when K-108 resumed forward flow. 14-294 Controlled Blowdown 08/10/2014 7:51:00 pm 11:10:00 pm 199 min Yes No No BPI\FUELMO 491 Determination Cause Took production out of Annex and put it in the old plant for work on 60 inch GTL. Had to lower gas rates to keep rate in range of flow meter. IP and LP compressors flared during swap. Action Taken Gas rete to old plant stable and IP and LP compressors bit. 14-312 Controlled Blowdown 08/17/2014 12:07:00 pm 2:42:00 pm 155 min Yes No No BP1\SPRINGG 390 Determination Cause Testmgoontrolson K-105 Action Taken testing done 14-319 Controlled Blowdown 08/23/2014 12:52:00 am 2:44:00 am 112 min Yes No Determination Cause Depressure P-LDF through A-S/C for line lift Action Taken Depressured to 509 and blocked in 14-321 Flare Relief 08/25/2014 10:14:00 am 8:11:00 pm 597 min Yes No Determination Cause Flared off V-136 and 3rd stage flare#3 open for 3.63 hours due to low oil rete Action Taken Waited for GC1 oil rate to stabilize above 55 mbopd No BP1\SPRINGG 860 No BP1\SPRINGG 2501 Generated 09/09/2014 1:36:11 PM Page 8 of 10 Flare Start Date 08/01/2014 Flare End Date 08/3112014 14-332 Flare Relief 08/29/2014 8:30:00 am 9:45:00 am 75 min No No No BP1\HELMIGBJ 770 Determination Cause Shutdown GILT 3200 and depressured to flare. Action Taken Depressuring completed at this time. 14-334 Flare Relief 08/30/2014 5:20:00 pm 9:00:00 pm 220 min No No No BP1\HELMIGBJ 440 Determination Cause Depressured GT -13 to flare for line lift. Action Taken Shut in to flare when pressure was at 250 psig. 14-338 Flare Relief 08/31/2014 12:00:00 am 12:00:00 am 1440 min No No No BP1\HELMIGBJ 520 Determination Cause GC1 is shutdown for TAPS. Flaring off V-136 to maintain blanket gas on skim and dirty water tanks. Action Taken TAPS is over and rete is now flowing to the GC. Total Volume (MSCF) 10172 Generated 09/09/2014 1:36:11 PM Page 9 of 10 Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Sunday, August 10, 2014 11:00 AM To: Hunt, Jennifer L (DOA) Cc: Roby, David S (DOA); Ferguson, Victoria L (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, OPS GC3&PCC OSM; AK, OPS GC3 Facility & Field OTL; AK, OPS GC1 OSM; PS GC1 Facility OTL Subject: Flaring Events at GC3 an To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC ien nifer. hu ntO-alaska. qov dave. robV@alaska.goy victoria.ferg uson aalaska.gov From: Wendy Hiester, GPB Production Optimization Team Leader GC3: A flaring event occurred at GC3 starting at 08/07/2014 14:45 and stopping at 08/08/2014 02:20 with a volume of 3855 (MSCF). The event lasted for 695 minutes and was due to a Wet Gas compressor shutdown because of control/instrumentation failure associated with a faulty electrical relay. To stop the flaring, wells were shut in or choked back. GC1: A flaring event occurred at GCI starting at 08/04/2014 15:40 and stopping at 08/04/2014 18:05 with a volume of 250 (MSCF). The event lasted for 145 minutes. GC1 Flared off of V-136 IP Gas Scrubber when K-108 IP Compressor lost forward flow. Flaring stopped when K-108 resumed forward flow. A flaring event occurred at GC 1 starting at 08/02/2014 15:20 and stopping at 08/02/2014 19:15 with a volume of 370 (MSCF). The event lasted for 235 minutes. GCI Flared while swapping K-105 and K-106 LP compressors. Flaring stopped when K-106 was stabilized. A flaring event occurred at GCI starting at 08/01/2014 08:00 and stopping at 08/01/2014 18:00 with a volume of 20 (MSCF). The event lasted for 600 minutes. 8/1 GC1 Flared off of V -120A LP Gas K.O. Drum because of fluctuating LP gas rates. The flaring stopped once gas rate was stabilized. A flaring event occurred at GCI starting at 07/31/2014 00:01 and stopping at 07/31/2014 23:59 with a volume of 370 (MSCF). The event lasted for 1438 minutes. 7/31 GCI Flaring off of V-136 because K-107 IP Compressor loss forward flow. Flaring was stopped once forward flow was re-established through K-107. Please let me know if you have any questions. Wendy Hiester (alt. Kellie Okonek) PCC/EOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 227-7144 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akoosocceoctIPbo.com Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.coml Sent: Sunday, August 17, 2014 8:57 PM To: Hunt, Jennifer L (DOA) Cc: Roby, David S (DOA); Ferguson, Victoria L (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, OPS GC3&PCC OSM; AK, OPS CCP CGF OSM; AK, OPS CGF OTL; AK, OPS GC1 OSM; AK, OPS GC1 Facility OTL; AK, OPS FS3 OSM; AK, OPS FS3 Facility OTL Subject: Flaring Events at CGF, d FS3 To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC Tenn iter. h untO-alaska. qov dave. robv(&alaska. qov victoria.ferg usonoalaska. qov From: Wendy Hiester, GPB Production Optimization Team Leader CGF Following advance notification to Victoria Ferguson of the AOGCC, extended flaring events occurred at CGF from August 10-16, 2014 while restarting the facility after a prolonged planned shutdown for maintenance. Flaring was permitted to continue while operations personnel attempted to restart the facility equipment. These start-up related flaring events have stopped now that the CGF shutdown is complete. 1) On 8/16/2014, flaring at CGF started at 01:30 and stopped at 06:00 with a volume of 15972 (MSCF). The event lasted for 270 minutes. 2) On 8/15/2014, flaring at CGF started at 00:01 and continued through midnight with a volume of 81383 (MSCF). The event lasted for 1439 minutes. 3) On 8/14/2014 flaring at CGF started at 02:45 and continued through midnight with a volume of 13731 (MSCF). The event lasted for 1275 minutes. 4) On 8/12/2014, flaring at CGF started at 04:30 and stopped at 05:05 with a volume of 255 (MSCF). The event, which lasted for 35 minutes, was due to shutdown of Compressor 1802 for planned maintenance. The event ended when depressurization of the compressor was complete. 5) On 08/10/2014, flaring at CGF started at 19:40 and stopped at 23:58 with a volume of 32410 (MSCF). The event, which lasted for 258 minutes, was due to depressurizing the WOA 60" line and 4938 Inlet Separator vessel for planned maintenance. The event ended when depressurization was completed. GC1 A flaring event also took place at GCI on 08/10/2014 due to the same planned maintenance on the WOA 60" line as flaring event #5 at CGF above. The IP and LP compressors flared during the required swap of production from the GC1 Annex to the Old Plant to perform the maintenance. The flaring stopped when the gas rate to old plant was stable. The flare event at GC1 started at 08/10/2014 19:51 and stopped at 08/10/2014 23:10 with a volume of 491 (MSCF). The event lasted for 199 minutes. FS3 Flaring events occurred at FS3 from August 12-14 while restarting the facility after a prolonged planned shutdown for maintenance. These flaring events have stopped now that maintenance is complete. 1) A flare event at FS3 starting at 08/14/2014 03:30 and stopping at 08/14/2014 03:35 with a volume of 80 (MSCF). The event lasted for 5 minutes and was due to starting the 1803 compressor. The flaring stopped when the startup sequence was complete. 2) A flare event at FS3 starting at 08/14/2014 14:22 and stopping at 08/14/2014 14:34 with a volume of 60 (MSCF). The event lasted for 12 minutes and was due to depressuring the 14D common line at DS 14 in order to isolate a well slot choke. The flaring stopped when the line was depressured to a safe energy state. 3) A flare event at FS3 starting at 08/14/2014 17:06 and stopping at 08/14/2014 17:11 with a volume of 60 (MSCF). The event lasted for 5 minutes and was due to shutting down the 1803 compressor to troubleshoot the DC LO pump run issue. The flaring stopped when the shutdown sequence was complete. 4) A flare event at FS3 starting at 08/13/2014 23:34 and stopping at 08/13/2014 24:00 with a volume of 242 (MSCF). The event lasted for 26 minutes and was due to depressuring the 14BC common line and MI line for a gas leak on the MI flange. The flaring stopped when the lines were depressured to a safe energy state. 5) A flare event at FS3 starting at 08/12/2014 14:00 and stopping at 08/12/2014 18:00 with a volume of 120 (MSCF). The event lasted for 240 minutes and was due to shutting down T\C 1803 after attempting 3 starts. Flaring stopped once shutdown was complete. 6) A flare event at FS3 starting at 08/12/2014 03:00 and stopping at 08/12/2014 09:00 with a volume of 9015 (MSCF). The event lasted for 360 minutes. Flaring occurred when the STV -IP T\C 1802 unloaded due to low gas rates. Flaring was stopped by increasing rates to load the STV/IP T/C. Please let me know if you have any questions. Wendy Hiester (alt. Kellie Okonek) PCCIEOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 227-7144 Harmony: 758 4404 Pager 574 (WOA - access #4236) or 1890 (EOA - access #5100) e-mail akoosocceoctlAbo.com Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Saturday, August 23, 2014 8:41 AM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; Kruger, Dale O; AK, OPS GC1 OSM; AK, OPS GC1 Facility OTL; AK, OPS PCC EOC TL; AK, OPS CGF OTL; AK, OPS CCP CGF OSM; AK, HSSEE Env Adv Cent al; Hauger, Wayne A Subject: Gas flaring events ad= CGF To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC jennifer.hunt(a)alaska.gov dave.robV( alaska.gov victoria.ferguson(o)alaska.gov From: Kellie Okonek, GPB Production Optimization Team Leader A flaring event occurred at GC1 starting at 08/23/2014 00:52 and stopping at 08/23/2014 02:44 with a volume of 860 (MSCF). The event lasted for 112 minutes, and was due to depressurization of P-LDF for planned maintenance. A flaring event occurred at CGF starting at 08/22/2014 03:25 and stopping at 08/22/2014 03:39 with a volume of 7677 (MSCF). The event had a volume greater than 5000 (MSCF), and was due to 1855 MI compressor shutdown caused by a process swing. Flaring stopped when the MI compressor was re -started. Please let me know if you have any questions Kellie Okonek (alt. Travis Rybicki) PCC/EOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 382 1370 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail ako s cceoctl b .com Hunt, Jennifer L (DOA From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj Sent: Friday, August 29, 2014 12:17 PM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; Kruger, Dale O; AK, OPS GCI OSM; AK, OPS GC1 Facility OTL; AK, HSSEE Env Adv East; AK, OPS FS2 Facility OTL; AK, OPS FS2 OSM; Burgess, David H; AK, OPS PCC EOC TL Subject: Gas flaring events at GC1, FS2 To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC iennifer huntaalaska.gov dave robs alaska.gov victoria Ferguson o0alaska.gov From: Kellie Okonek, GPB Production Optimization Team Leader A flaring event occurred at FS2 starting at 08/28/2014 22:23 and stopping at 08/29/2014 with a volume of 856 (MSCF). The event lasted for 97 minutes, and was due to depressurization of 16/17D commonlines for planned work during the A/L outage. A flaring event occurred at FS2 starting at 08/27/2014 03:00 and stopping at 08/27/2014 17:30 with a volume of 4228 (MSCF). The event lasted for 870 minutes, and was due to T/C 1801 s/d for planned 4000 hr inspection. A flaring event occurred at GC1 starting at 08/25/2014 10:14 and stopping at 08/25/2014 20:11 with a volume of 2501 (MSCF). The event lasted for 597 minutes, and was due to low oil rate flaring. Flaring stopped when rates stabilized above 55 mbd. Please let me know if you have any questions. Kellie Okonek PCC/EOC Production Optimization TL Office: (907) 659-4472 Cell: (907) 382-1370 akopspcceoctl@bp com Hunt, Jennifer L (DOA From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com) Sent: Saturday, August 30, 2014 3:09 PM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; Kruger, Dale O; AK, OPS GCI OSM; AK, OPS GC1 Facility OTL; AK, HSSEE Env Adv East; AK, OPS FS2 Facility OTL; AK, OPS FS2 OSM; Burgess, David H; AIJ.QgS FS3 OSM; AK, OPS FS3 Facility OTL Subject: Gas flaring events am= FS2, FS3 To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: victoria Victor so ergu aska pOoGCC iennifer hunt aaalaska aov dave.robv@alaska.gov From: Kellie Okonek, GPB Production Optimization Team Leader A flaring event occurred at GC1 starting at 08/29/2014 08:30 and stopping at 08/29/2014 09:45 with a volume of 770 (MSCF). The event lasted for 75 minutes, and was due to shutdown of GLT 3200 and depressurization for planned maintenance. /2014 0:00 and at 14 16:30 with a lume of (A flaring event occurred MSCF). The event lasted tforr 990 minutes, anat d was du0e t depressurization of East side lift gas line for oplanned 787 maintenance. 014 8 and ng at 29/2014 01:49 a volume of 70 (A flaring event occurred MSCF). The event lastedtfor 81sminu esng t and was due o depressurization of h/e East side lift gas line for planned maintenance. Please let me know if you have any questions. Kellie Okonek PCC/EOC Production Optimization TL Office: (907) 659-4472 Cell: (907) 382-1370 akopsPcceoctlC@bp.com Hunt, Jennifer L (DOA From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.Com) Sent: Monday, September 01, 2014 12:07 PM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; Kruger, Dale O; AK, OPS GCI OSM; AK, OPS GCI Facility OTL; AK, OPS PCC EOG TL Subject: Gas flaring events at GCI CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC To: Jennifer Hunt, AOGCC save robvaalaska.00v victoria ferouson0aiaska.00v Jennifer hunt(dalaska oov From: Kellie Okonek, GPB Production Optimization Team Leader A flaring event occurred at GCI starting at 08/31/2014 00:00 and stopping at 09/0112014 with a volume of 520 (MSCF). The event lasted for 1440 minutes, and was due to flaring as a means of maintaining blanket gas on skim and dirty water tanks while plant was sld. A flaring event occurred at GCI starting at 08/3012014 17:20 and stopping at 2014 21:00 with a volume of 440 (MSCF). The event lasted for 220 minutes, and was due to depressurization off gas transit line GT -13 for planned as maintenance/inspection. Please let me know if you have any questions. Kellie Okonek PCC/EOC Production Optimization TL office: (907) 659-4472 Cell: (907) 382-1370 4opspcceoctlPbp.00m STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000031 2. Facility Name PBU GC 1 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition September -2014 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold Q Pool Name Pool Code Percent 7. Reinjected Q PRUDHOE 640150 99.84% LISBURNE 640144 0.00% 8. Flared or vented lhour or less 1,010 MIDNIGHT SUN 640158 0.16% PT MCINTYRE 640180 0.00% 9. Flared or vented more than 1 hour (see instr.) 73,648 10. Pilot and Purge 55,093 11. Assist Gas 0 12. Fuel gas used in lease operations. 634,808 Other (see instructions) Q Official Use Only13. Authorization>1 hr: Safety 1 4, �✓ CF 14. TOTAL VOLUME (ITEMS 6-12) 764,559 Lease Use MCF 15. NGL Gas Equivalent Q Conservation MCF 16. Purchased gas Q Waste: MCF 17. Transferred from: Q n 1 S -f' / ,1 —is - / (.— 18. 18. TTransferredferretl to: (Express as a negative #) CGF -61,346,967 Commissioner Date 19. Remarks: I hereby certify that tlW foregoing is true and correct to the best of my knoMedge. /t /�/) , , Signature04� (.6AC((�/i,/ Title Mana er Production Taxes and Ro alties Alaska Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 AAC25.235. 61 Printed Name Diane ColleyPhone (907) 564-5775 Date 101104 V �t 3/Ise/S Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT Page 7 September 2014 DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 9/2/2014 0128-0148 620 Not required for unplanned events <=1 hr Not required for unplanned events <= 1 hr 9/10/2014 2043-2052 270 9/29/2014 0920-0930 120 TOTAL 1,010 DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 9/4/2014 1010-1740 970 See attachments See attachments 9/5/2014 0215-2210 1,420 9/6/2014 0140-2400 1,070 9/7/2014 1041-2400 401 9/8/2014 0204-2400 600 9/9/2014 0105-2400 490 9/10/2014 0000-2400 9,000 9/10/2014 1636-1821 120 9/11/2014 0000-1950 10,562 9/11/2014 1308-1622 340 9/12/2014 0032-2242 15,952 9/13-16/2014 0000-1640 17,372 9/17/2014 0000-2148 914 9/19/2014 1105-2140 648 9/20/2014 0114-1630 2,485 9/21/2014 0404-2233 574 9/22/2014 0258-0850 6,230 9/23/2014 1106-1808 3,650 9/29/2014 0010-0300 560 TOTAL 73,358 planned Events Less Than or Equal 1 Hour AND <= 5,000 and DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO 9/28/2014 1420-1830 290 See attachments See attachments TOTAL 290 10/14/2014 11:24 AM O c J O M N Oi 1� r '° o S 1� .w N O 0 M U 0 r U M f O O c a > 0 a 0 '° o S > > w � V 0 M U 0 r U O C V O d d W w O C O O C O O d d m m m C C a a j LL d A d C d C d p � H Flare Start Date 09/01/2014 Flare End Date 09/30/2014 GC1 Flare Report Total Volume (MSCF) 74658 Report Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 14-351 Flare Relief 09/04/2014 10:10:00 am 5:40:00 pm 450 min Yes No No Determination Cause New Compressor surge control setup Action Taken Flaring stopped when work on surge control system was complete for the day 14-353 Flare Relief 09/05/2014 2:15:00 am 10:10:00 pm 1195 min Yes No No Determination Cause Sk-18 Compressor surge controller installation Action Taken Flaring stopped whe work on surge controllers ended for the day 14-357 Flare Relief 09/06/2014 1:40:00 am 12:00:00 am 1340 min No No No Determination Cause Surge controller installation on IP compressor K-108 BP1\FISHERCD 1070 Action Taken Flaring will stop when controller installation is complete 401 BP1\FISHERCD 600 BPt\FISHERCD 490 14-360 Flare Relief 09/07/2014 10:41:00 am 12:00:00 am 799 min Yes No No Determination Cause Installation of IPP compressor surge control system Action Taken Flaring will stop when surge controller work is complete 14-364 Flare Relief 09/08/2014 2:04:00 am 12:00:00 am 1316 min Yes No No Determination Cause IP compressordown to install newanti-surge controller Action Taken flaring will end when work on control system is complete 14-365 Flare Relief 09/09/2014 1:0500 am 12:00:00 am 1375 min Yes No No Determination Cause Installation of Sk-18 anti -surge controllers Action Taken Flaring will end when work on controlers is complete 14-367 Flare Relief 09/10/2014 12:00:00 am 12:00:00 am 1440 min Yes No No Determination Cause No IP compressors running Action Taken V-136 Bare setpoint intentionally lowered to minimize the volume flared by preventing LP Flaring 14-367 Controlled Blowdown 09/10/2014 4:36:00 pm 6:21:00 pm 105 min Yes No No Determination Cause 2 GLT 112o washes start-ups Action Taken washes done 14-369 Controlled Blowdown 09/11/2014 12:00:00 am 7:50:00 pm 1190 min Yes Determination Cause low oil rate BP1\FISHERCD 1070 BPt\FISHERCD 970 BP1\FISHERCD 1420 BP1\FISHERCD 1070 BP1\FISHERCD 401 BP1\FISHERCD 600 BPt\FISHERCD 490 BP1\SPRINGG BPt\SPRINGG 9000 120 No No BP1\SPRINGG 10562 Generated 10/02/2014 2:36:16PM Page 7 of 10 Flare Start Date 09/01/2014 Flare End Date 09/30/2014 Action Taken VA36 flare setpoint intentionally lowered to minimize the volume flared by preventing LP flaring 14-369 Controlled Blowdown 09/11/2014 1:08:00 pm 4:22:00 pm 194 min Yes No No BP1\SPRINGG 340 Determination Cause Lost K-105 several times during testing Action Taken Swapped compressors 14-372 Controlled Blowdown 09/12/2014 12:32:00 am 10:42:00 pm 1330 min Yes No No BP1\SPRINGG 15952 Determination Cause High transit pressure and low oil rates. Based on: FQI-7446T = 510 / valve #3 = 5865 / V-136=9577. Action Taken Reduced transit press. and waiting for GC1 oil rate to stabilize above 55 mbopd 14-374 Flare Relief 09/13/2014 12:00:00 am 12:00:00 am 1440 min Yes No No BP1\SPRINGG 4162 Determination Cause LP/IP flaring due to allowing transit gas pressure to exceed installed opacity of LP/IP compressors Action Taken Request PCC to lower transit pressure. 14-376 Flare Relief 09/14/2014 12:00:00 am 12:00:00 am 1440 min Yes No No BP1\SPRINGG 8625 Determination Cause LP/IP flaring due to allowing transit gas pressure to exceed installed opacity of LPAP compressors Action Taken Request PCC to lower transit pressure. 14-378 Flare Relief 09/15/2014 12:00:00 am 12:00:00 am 1440 min Yes No No BP1\SPRINGG 3649 Determination Cause LP/IP flaring due to allowing transit gas pressure to exceed installed capacity of LP/IP compressors Action Taken Request PCC to lower transit pressure. 14-381 Flare Relief 09/16/2014 12:00:00 am 2:40:00 pm 880 min Yes No No BP1WRINGG 936 Determination Cause LP/IP flaring due to allowing transit gas pressure to exceed installed opacity of LP/IP compressors Action Taken Request PCC to lower transit pressure. 14-383 Flare Relief 09/17/2014 12:00:00 am 9:48:00 pm 1308 min Yes No No BPI\SPRINGG 914 Determination Cause LPAP flaring due to allowing transit gas pressure to exceed installed opacity of LP/IP compressors Action Taken Lower transit pressure. 14-384 Flare Relief 09/19/2014 11:05:00 am 9:40:00 pm 635 min Yes No No BP1\SPRINGG 648 Determination Cause high transit pressure periodically bumping v-136 flare Action Taken waiting to stabilize 14-385 Flare Relief 09/20/2014 1:14:00 am 4:30:00 pm 915 min Yes No No BPI\SPRINGG 2485 Determination Cause high transit pressure periodically bumping v-136 flare Action Taken waiting to stabilize 14-386 Flare Relief 09/21/2014 4:04:00 am 10:33:00 pm 1109 min Yes No No BPI\SPRINGG 574 Determination Cause high transit pressure periodically bumping v-136 flare Action Taken waifing to stabilize 14-387 Flare Relief 09/22/2014 2:58:00 am 8:50:00 am 352 min Yes No No BP1\SPRINGG 6230 Determination Cause Loss of K-7001-depressured /Several starts of K-7001 after STP power loss. Generated 10/02/2014 2:36.16PM Page 8 of 10 Flare Start Date 09/01/2014 Flare End Date 09/30/2014 Action Taken K-7001 online 14-388 Controlled Blowdown 09/23/2014 11:06:00 am 6:08:00 pm 422 min Yes Determination Cause Lined up PM2 to depressurethrough B -SIC Action Taken depressured 14-395 Controlled Blowdown 09/28/2014 2:20:00 pm 6:30:00 pm 250 min No Determination Cause Depressuring the PM2 line for pigging operation. Action Taken Flaring stopped when the PM2 line was depressured. 14-397 Controlled Slowdown 09/29/2014 121000 am 3:00:00 am 170 min Yes Determination Cause Flaring due to high transit gas pressure. Action Taken Flaring stopped when transit gas pressure was lowered and stabilized. No No BPIWATTRR 560 Total Volume (MSCF) 74658 Generated 10/02/2014 2:36:16PM Page 9 of 10 No No No Yes BPIISPRINGG BP1WATTRR 3650 290 No No BPIWATTRR 560 Total Volume (MSCF) 74658 Generated 10/02/2014 2:36:16PM Page 9 of 10 Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Tuesday, September 16, 2014 10:07 AM To: Hunt, Jennifer L (DOA) Cc: Roby, David S (DOA); Ferguson, Victoria L (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, OPS GC3&PCC OSM; AK, OPS GC1 OSM; AK, OPS GC1 Facility OTL; AK, OPS PCC/EOC Process Engineer; Mueller, Andrew; AK, RES GPB Central Prod Opt Engr Subject: Flaring Events at GC1 To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC iennifer.huntcdalaska.gov dave roby(obalaska.gov victoria. ferg uson (d.a laska. g ov From: Wendy Hiester, GPB Production Optimization Team Leader Extended flaring events have occurred at GC 1 from September 2-15, 2014 while stabilizing operations after a prolonged planned shutdown of GC2 for maintenance. The flaring initially occurred on September 2 due to low oil rates resulting in insufficient gas to the IP compressors. Intermittent flaring occurred while operations personnel worked on the compressor surge control set-up on September 4`h. A new IP compressor surge control system was installed on September 5-9 with coincident flaring as this maintenance work was conducted. On September 10`h, the IP compressors were off-line. The V-136 flare set -point was intentionally lowered on September 10-12 to minimize the volume flared by preventing LP flaring that requires the addition of assist gas to prevent black smoke. GC 1 production was reduced to minimize flaring while Operations continued to troubleshoot the problem. Transit gas pressure was reduced in an effort to provide operating conditions favorable to the IP compressor. Yesterday, a possible root cause of the problem was found in a low temperature from the crude heater. GC 1 is working on a solution to the crude heater problem and production will continue to be curtailed to reduce flaring. Date Start Stop Duration (min) Volume mscfh ( ) 9/1/2014 9/2/2014 1:28 1:48 20 620 9/3/2014 9/4/2014 10:10 17:40 450 970 9/5/2014 2:15 22:10 1195 1420 9/6/2014 1:40 24:00 1340 1070 9/7/2014 10:41 24:00 799 401 9/8/2014 2:04 24:00 1316 600 9/9/2014 1:05 24:00 1375 1 490 9/10/2014 0:00 24:00 1440 9000 9/11/2014 0:00 19:50 1190 10562 9/12/2014 0:32 24:00 1330 15952 9/13/2014 0:00 24:00 1440 4162 9/14/2014 0:00 24:00 1440 8625 9/15/2014 0:00 24:00 1440 3649 Other GC1 Flaring Events: On 09/10/2014, flaring during GLT water washes at GC1 started at 16:36 and stopped at 18:21 with a volume of 120 (MSCF). The event lasted for 105 minutes and ended when the water washes were complete. On 09/10/2014, flaring at GCI occurred while depressuring the GLT for maintenance work. The flaring started at 20:43 and stopped at 20:52 with a volume of 270 (MSCF). The event lasted for 9 minutes and ended when the depressuring was completed. Please let me know if you have any questions. Wendy Hiester (alt. Kellie Okonek) PCCIEOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 227-7144 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akoasocceoctIAbo com Hunt Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com) Sent: Sunday, September 28, 2014 11:46 PM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; Kruger, Dale O; AK, OPS GC1 OSM; AK, OPS GC1 Facility OTL; AK, OPS PCC EOC TL; AK, OPS CGF OTL; AK, OPS CCP CGF OSM; Hauger, Wayne A; Burgess, David H; AK, OPS GC2 OSM; AK, OPS GC2 Facility OTL; AK, OPS FSI OSM; AK, OPS FS1 Facility OTL; AK, HSSEE Env Adv East Subject: Gas flaring events at CGF, GC1, GC2, and FS1 Categories: Attention To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC j_ennifer hunt(o)alaska.gov clave robvno.alaska.00v victoria ferouson@alaska.00v From: Kellie Okonek, GPB Production Optimization Team Leader A flaring event occurred at CGF starting at 09/24/2014 04:12 and stopping at 09/24/2014 05:23 with a volume of 13186 (MSCF). The event lasted for 71 minutes. The event had a volume greater than 5000 (MSCF), and was due to T/C 1805 shutdown due to pressure controller malfunction. Flaring stopped when the equipment was repaired and re -started. A flaring event occurred at GCI starting at 09/23/2014 11:06 and stopping at 09/23/2014 18:08 with a volume of 3650 (MSCF). The event lasted for 422 minutes, and was due of depressurization of the PM2 line for maintenance. A flaring event occurred at GC1 starting at 09/22/2014 02:58 and stopping at 09/22/2014 08:50 with a volume of 6230 (MSCF). The event lasted for 352 minutes. The event had a volume greater than 5000 (MSCF), and was due to loss of K- 7001 compressor. Flaring stopped when K-7001 was repaired and re -started. A flaring event occurred at GC1 starting at 09/21/2014 04:04 and stopping at 09/21/2014 22:33 with a volume of 574 (MSCF). The event lasted for 1109 minutes, and was due to high transit pressure. Flaring stopped when gas production was stabilized. A flaring event occurred at GC1 starting at 09/20/2014 01:14 and stopping at 09/20/2014 16:30 with a volume of 2485 (MSCF). The event lasted for 916 minutes, and was due to high transit pressure. Flaring stopped when gas production was stabilized. A flaring event occurred at GC1 starting at 09/19/2014 11:05 and stopping at 09/19/2014 21:40 with a volume of 648 (MSCF). The event lasted for 635 minutes, and was due to high transit pressure. Flaring stopped when gas production was stabilized. A flaring event occurred at GC1 starting at 09/17/2014 00:00 and stopping at 09/17/2014 21:48 with a volume of 914 (MSCF). The event lasted for 1308 minutes, and was due to high transit pressure. Flaring stopped when gas production was stabilized. A flaring event occurred at GCI starting at 09/16/2014 00:00 and stopping at 09/16/2014 14:40 with a volume of 936 (MSCF). The event lasted for 880 minutes, and was due to high transit pressure. Flaring stopped when gas production was stabilized.. A flaring event occurred at GCI starting at 09/15/2014 00:00 and stopping at 09/16/2014 with a volume of 3649 (MSCF). The event lasted for 1440 minutes, and was due to high transit pressure. Flaring stopped when gas production was stabilized. A flaring event occurred at FS1 starting at 09/27/2014 04:00 and stopping at 09/27/2014 23:15 with a volume of 6417 (MSCF). The event lasted for 1155 minutes. The event had a volume greater than 5000 (MSCF), and was due to T/C 1802 shutdown for planned maintenance. A flaring event occurred at GC2 starting at 09/27/2014 10:00 and stopping at 09/27/2014 20:45 with a volume of 18365 (MSCF). The event lasted for 645 minutes. The event had a volume greater than 5000 (MSCF), and was due to IP/LP compressor shutdown due to hydrate formation on outlet piping. Flaring stopped when compressor was re -started. Please let me know if you have any questions. Kellie Okonek PCC/EOC Production Optimization TL Office: (907) 659-4472 Cell: (907) 382-1370 akopspcceoctl bo.com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION RECEIVIZU NOV 18 2014 AOGCC 1. Facility Number 0290000031 2. Facility Name PBU GC 1 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition October -2014 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold D Pool Name Pool Code Percent 7. Reinjected D PRUDHOE 640150 99.89% LISBURNE 640144 0.00% 8. Flared or vented 1 hour or less 2,022 MIDNIGHT SUN 640156 0.11% PT MCINTYRE 640180 0.00% 9. Flared or vented more than 1 hour (see instr 1 5,476 10. Pilot and Purge 56,880 11. Assist Gas 0 12. Fuel gas used in lease operations. 736,945 13. Other (see instructions) O Official Use Only Authorization >1 hr: SafeTylt��o MCF 14. TOTAL VOLUME (ITEMS 6.12) $01,323 Lease Use MCF 15. NGL Gas Equivalent Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: 0 n /-2-1,s-- . ^7 _ / c J C ommissioner Date 18. Transferred to: (Express as a negative #) CGF -67,252,989 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. /n Note: All volumes must be corrected Signature � JWM / Title Manager Production Taxes and Royalties Alaska t0 pressure of 14.65 psis and to a temperature of 60o F. Authority 20 14 /// Printed Name Diane Colley Phone (907) 564-5775 Date /( / AAC25.235. V/T 12114114 Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate 10/6/2014 10/10/2014 10/12/2014 10/19/2014 10/21/2014 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT -GC -1 GAS FLARING INCIDENT REPORT October 2014 TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 1508-1528 625 Not required for unplanned events <= 1 hr 2223-2258 707 2010-2016 240 0705-0714 110 2043-2051 340 TOTAL 2,022 Not required for unplanned events <= 1 hr � urvm vvwmt Vt>LKIF uuN ur INLIULN l&LAUSE ACTION TAKEN TO ELIMINATE CAUSE 10/3/2014 0800-1600 1,820 See attachments See attachments 10/5/2014 0125-0332 1,650 10/6/2014 0119-1002 406 10/25/2014 0500-2359 570 TOTAL 4,446 Planned Events Less Than or Equal 1 Hour AND <= 5,000 ni DATE TIME VOLUME DESCRIPTION OF INCIDENT&CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 10/23/2014 0751-2051 TOTAL Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME IE DESCRIPTION OF IN 1,030 See attachments TOTAL 2,022 4,446 0 1,030 56;880 0 64,378 See attachments MAIM tL EIME D NOV 18 2014 A®GCC 11/13/2014 2:39 PM Flare Start Date 10/01/2014 " ED E 1 y E D Flare End Date 10/31/2014 GC1 Flare Report SOV 18 2014 Total Volume (11 7498 Report e.r11 ''a Numbs System Date Start Time Stop Time Duration Intermittent `Meek Smbke Planned Reported By Volume 14-402 Controlled Blowdown 10/03/2014 8:00:00 am 4:00:00 pm 480 min Yes No No BP1\SELFJR 1820 Determination Cause Bleed down poll mack line to B -sic due to leking valve for pigging Action Taken point mack line sated out 14-407 Controlled Slowdown 10/05/2014 125:00 am 3:32:00 am 127 min No No No BP1\FUELMO 1650 Determination Cause Depressured PM2 LDF due to leak by on pig launoer hand valves, Had to depressure in order to load pig at PM2 Action Taken PM2 derpressure. 14-408 Controlled Slowdown 10/06/2014 1:19:00 am 10:02:00 am 523 min No No No BP1\FUELMO 406 Determination Cause Depressure G-44 for safe out. Action Taken G-44 depressumd and stopped flaring 14-439 Flare Relief 10/23/2014 7:51:00 am 8:51:00 pm 780 min No No Yes SP1\MATTRR 1030 Determination Cause Flared from V-136 while both IP compressors were shutdown for the safe -out and blinding of K-107. Action Taken Flaring stopped when K-107 was blinded and K-108 was restarted. 14-443 Flare Relief 10/25/2014 5:00:00 am 11:59:00 pm 1139 min Yes No No BP1\SELFJR 570 Determination Cause periodic high transit gas pressure do to temp changes backs out IP GAS COMP Action Taken ADJUSTAND CONTACT PCC PRESURE LOWERS AND FORWARD FLOW IS RESUMED OUT OF FLARE Total Volume (MSCF) 7498 Generated 11/17/2014 9:25:27AM Page 8 of 10 Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj Sent: Thursday, October 16, 2014 9:53 AM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; Kruger, Dale O; AK, OPS GC1 OSM; AK, OPS GC1 Facility OTL; Hauger, Wayne A; Burgess, David H; AK, OPS FS1 OSM; AK, OPS FSI Facility OTL; AK, HSSEE Env Adv East; Loader, Neil; AK, OPS FS3 Facility OTL; AK, OPS FS3 OSM; AK, OPS GPMA Facility OTL; AK, OPS GPMA OSM; AK, OPS PCC EOC TL Subject: Gas flaring events at GC1, FS1, FS3, LPC To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC iennifer.huntaalaska.gov dave.roby(aalaska.aov victoria.fergusonaalaska.gov From: Kellie Okonek, GPB Production Optimization Team Leader A flaring event occurred at FS1 starting at 10/15/2014 02:17 and stopping at 10/15/2014 02:56 with a volume of 10833 (MSCF). The event had a volume greater than 5000 (MSCF), and was "flaring for the field" due to the CGF booster shutdown. A flaring event at FS1 starting at 10/10/2014 16:50 and stopping at 10/10/2014 17:50 with a volume of 71254 (MSCF). The event had a volume greater than 5000 (MSCF), and was due to shutdown/depressure of 12B commonline for planned maintenance. A flaring event at FS1 starting at 10/04/2014 14:00 and stopping at 10/04/2014 15:45 with a volume of 378 (MSCF). The event lasted for 105 minutes, and was due to LPS T/C 1804 crank spin for planned waterwash. A flaring event at FS1 starting at 10/02/2014 15:50 and stopping at 10/02/2014 17:45 with a volume of 878 (MSCF). The event lasted for 115 minutes, and was due to LPS T/C 1804 spin cooling for planned waterwash. A flaring event at FS1 starting at 10/02/2014 08:35 and stopping at 10/02/2014 10:20 with a volume of 583 (MSCF). The event lasted for 105 minutes, and was due to LPS T/C 1803 crank spin for planned waterwash. A flaring event at FSI starting at 10/01/2014 00:45 and stopping at 10/01/2014 03:15 with a volume of 1120 (MSCF). The event lasted for 150 minutes, and was due to LPS T/C 1803 spin cooling for planned waterwash. A flaring event at LPC starting at 10/14/2014 00:00 and stopping at 10/14/2014 12:16 with a volume of 5170 (MSCF). The event was a black smoke event. The event lasted for 736 minutes. The event had a volume greater than 5000 (MSCF), and was due to depressurization for RGI (residue gas injection) line for planned maintenance. A flaring event at LPC starting at 10/13/2014 21:32 and stopping at 10/14/2014 with a volume of 4208 (MSCF). The event was a black smoke event. The event lasted for 148 minutes, and was due to depressurization of the 24" commonline for planned maintenance. A flaring event at LPC starting at 10/13/2014 20:29 and stopping at 10/13/2014 20:33 with a volume of 214 (MSCF). The event was a black smoke event, and was due to 1807 injection compressor s/d and depressure for RGI maintenance. A flaring event at GCI starting at 10/06/2014 01:19 and stopping at 10/06/2014 10:02 with a volume of 406 (MSCF). The event lasted for 523 minutes, and was due to depressurization of G-44 for planned maintenance. A flaring event at GC1 starting at 10/05/2014 01:25 and stopping at 10/05/2014 03:32 with a volume of 1650 (MSCF). The event lasted for 127 minutes, and was due to depressurization of PM2 LDF in support of planned pigging activities. A flaring event at GC1 starting at 10/03/2014 08:00 and stopping at 10/03/2014 16:00 with a volume of 1820 (MSCF). The event lasted for 480 minutes, and was due to depressurization of PM2 LDF in support of planned pigging activities. A flaring event at GCI starting at 09/29/2014 00:10 and stopping at 09/29/2014 03:00 with a volume of 560 (MSCF). The event lasted for 170 minutes, and was due to high transit gas pressure flaring. A flaring event at GC1 starting at 09/28/2014 14:20 and stopping at 09/28/2014 18:30 with a volume of 290 (MSCF). The event lasted for 250 minutes, and was due to depressurization of PM2 LDF in support of planned pigging activities. A flaring event at FS3 starting at 10/01/2014 15:35 and stopping at 10/01/2014 17:15 with a volume of 405 (MSCF). The event lasted for 100 minutes, and was due to LPS T/C 1804 spin cooling for planned waterwash. A flaring event at FS3 starting at 09/29/2014 15:00 and stopping at 09/29/2014 16:30 with a volume of 470 (MSCF). The event lasted for 90 minutes, LPS T/C 1803 crank spin for planned waterwash. A flaring event at FS3 starting at 09/28/2014 01:10 and stopping at 09/28/2014 03:10 with a volume of 868 (MSCF). The event lasted for 120 minutes, and was due to LPS T/C 1803 spin cooling for planned waterwash A flaring event at FS3 starting at 09/28/2014 01:10 and stopping at 09/28/2014 03:10 with a volume of 60 (MSCF). The event lasted for 120 minutes, and was due to LPS T/C 1803 depressurization for waterwash. Please let me know if you have any questions. Kellie Okonek PCC/EOC Production Optimization TL Office: (907) 659-4472 Cell: (907) 382-1370 akopspcceoctl@bp.com Hunt, Jennifer L (DOA From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Friday, October 24, 2014 8:05 AM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; Kruger, Dale O; Hauger, Wayne A; AK, OPS PCC EOC TL; AK, OPS GC3 Facility & Field OTL; AK, OPS GC3&PCC OSM; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; AK OPS CGF OTL; AK, OPS CCP CGF OSM Subject: Gas flaring events at GC310 CGF To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC iennifer.huntCaalaska.gov dave.robv(@alaska.ocv victoria.ferousonna.alaska.gov From: Kellie Okonek, GPB Production Optimization Team Leader A flaring event occurred at GC3 starting at 10/24/2014 05:27 and stopping at 10/24/2014 19:55 with a volume of 6542 (MSCF). The event lasted for 868 minutes. The event had a volume greater than 5000 (MSCF), and was due to planned s/d of B-pad/HP production and an unplanned s/d of K-5500 wet gas compressor. Flaring slowed when depressurization was completed, but continued as K-5500 troubleshooting progressed. A flaring event occurred at GC1 starting at 10/23/2014 07:51 and stopping at 10/23/2014 20:51 with a volume of 1030 (MSCF). The event lasted for 780 minutes, and was due to s/d and depressure of K-3300 GLT compressor. A flaring event occurred at CGF starting at 10/19/2014 13:40 and stopping at 10/19/2014 23:59 with a volume of 99321 (MSCF). The event lasted for 619 minutes. The event had a volume greater than 5000 (MSCF), and was due to MI compressor s/d to accommodate safe lifting operations. Flaring stopped when the MI compressor was re -started. Please let me know if you have any questions. Kellie Okonek PCC/EOC Production Optimization TL Office: (907) 659-4472 Cell: (907) 382-1370 akopspcceoctl@bp.com Hunt, Jennifer L (DOA From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Sunday, October 26, 2014 7:54 PM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; Kruger, Dale O; Hauger, Wayne A; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; AK, OPS CGF OTL; AK, OPS CCP CGF OSM; Stobbs, David W; AK, OPS PCC EOC TL Subject: Gas flaring events at GC1, CGF To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC jennifer.hunt(a)alaska.aov dave.robvCa alaska.aov victoria.ferauson(a_alaska.aov From: Kellie Okonek, GPB Production Optimization Team Leader A flaring event occurred at CGF starting at 10/26/2014 14:48 and stopping at 10/26/2014 18:40 with a volume of 27132 (MSCF). The event lasted for 232 minutes. The event had a volume greater than 5000 (MSCF), and was due to T/C 1805 shutdwon due to control/instrumentation failure associated with a vibration card. Flaring stopped when the equipment was repaired and the machine re -started. A flaring event occurred at GC1 starting at 10/25/2014 05:00 and stopping at 10/25/2014 23:59 with a volume of 570 (MSCF). The event lasted for 1139 minutes, and was due to LP/IP compressor inability to meet discharge pressure required to enter transit gas system. Please let me know if you have any questions. Kellie Okonek PCC/EOC Production Optimization TL Office: (907) 659-4472 Cell: (907) 382-1370 akopspcceoctl(@bp.com DEC 16 2014 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION AOGCC FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000031 2. Facility Name PBU GC 1 3. Field PBU - WOA 4. Operator 14,p 5. MonthNear of Disposition November-2014 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold Pool Name PoolCode Percent 7. Reinjected PRUDHOE 640150 99.70% LISBURNE 640144 0,12/ 8. Flared or vented lhour or less 0 MIDNIGHTSUN 640158 0.18% PT MCINTYRE 640180 0.00% 9. Flared or vented more than 1 hour (see instr.) 16,320 10. Pilot and Purge 55,376 11. Assist Gas 0 12. Fuel gas used in lease operations. 724,539 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: SafetyC ! 32 MCF 14. TOTAL VOLUME (ITEMS 6.12) 796,235 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 45 Commissioner Date 18. Transferred to: (Express as a negative #) CGF -68,312,661 19. Remarks: I hereby certify that the oregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature Title Manager Production Taxes and Ro a) ies Alaska to pressure of 14.65 psia and to a / (,.J/� temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date / / AAC25.235. Form 10-422 Rev. 52009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate VOLUME TOTAL UP LXPLUKAIIUN (ALASKAJ INC. PRUDHOE BAY UNIT- GC -1 GAS FLARING INCIDENT REPORT November 2014 Not required for unplanned events <= 1 hr 0 ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events <= 1 hr Page 7 r 16/20/14 17)GCC 11/18/2014 1824-2307 460 See attachments See attachments 11/19/2014 0900-2030 6,580 11/20/2014 0100-0630 2,920 11/21/2014 0700-2400 6,180 TOTAL 16,140 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT& CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 11/17/2014 2100-2300 180 See attachments See attachments TOTAL 180 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events> 1 Hour 16,140 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events> 1 hour or 180 exceeding 5,000 MCF Pilot Purge 55,376 Assist 0 TOTAL FLARED VOLUME 71,696 12/11/2014 9:41 AM Flare StartDate 11/01/2014 Flare End Date 11/30/2014 GC1 Flare Report Total Volume (MSCF) 16320 Report Daily Volume (MSCF) No BPt\BROWNK 180 460 Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 14-471 Flare Relief 11/17/2014 9:00:00pm 11:00:00 pm 120 min No No Yes BP1\BROWNK 180 Determination Cause run coppus to cool down K-7000 LPS machine for A.M. work Action Taken none planned work 14473 Flare Relief 11/18/2014 6:24:00 pm 11:07:00 pm 283 min No No Determination Cause Annex shutdown... flared off V-136 to prevent black smoking due to low rates. Action Taken Restarted Annex Daily Volume (MSCF) No BPt\BROWNK 180 460 Daily Volume (MSCF) 460 14-476 Flare Relief 11/19/2014 9:00:00 am 8:30:00 pm 690 min Yes No No BP1\SELFJR 6580 Determination Cause GLT power load shed failure and tipped s/d various areas of plant Action Taken _ Electricians reset and fixed problem plant put bads on line ............... ......._.._......... __. .___._ .. ... ------- .._--------- .. .. ........... .... .___... ----------------- ___ Daily Volume (MSCF) 6580 14-479 Flare Relief 11/20/2014 1:00:00 am 6:30:00 am 330 min Yes No No BP1\SELFJR 2920 Determination Cause High gas transit line pressure caused by CGF compressor problems due to loss of booster pumps and backed out I/P compressors at get Action Taken PCC cut Production rates until CGF connected problems with boosters Daily Volume (MSCF) 2920 14482 Flare Relief 11/21/2014 7:00:00am 12:00:00 am 1020 min Yes No No BPII.SELFJR 6180 Determination Cause LP/ IP gas compressors loosing forward flow due to sporadic temp and gas rate changes Action Taken make adjustments to establish forward flow of Ip/ip compressors ......_.._ .. ........._..... ........ ................. .................... ............. ..._............ ................ ._--- ......__............... ._......... ..........._. Daily Volume (MSCF) 6180 Total Volume (MSCF) 16320 RECEIVE® DEC 16 2014 AOGCC Generated 12/02/2014 10:36:03AM Page 7 of 8 Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Sunday, November 23, 2014 9:46 AM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; Hauger, Wayne A; AK, OPS GC1 OSM; AK, OPS GC2 OSM; AK, OPS GC1 Facility OTL; AK, OPS GC2 Facility OTL, AK, OPS PCC EOC TL; AK, OPS FS1 Facilit OTL; AK, OPS FS1 OSM; Loader, Neil Subject: Gas flaring events alWGC2, FS1 To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC iennifer.huntaalaska.gov dave.robV(dalaska.gov victoria.ferguson(oalaska.g ov From: Kellie Okonek, GPB Production Optimization Team Leader A flaring event occurred at GC1 starting at 11/17/2014 21:00 and stopping at 11/17/2014 23:00 with a volume of 180 (MSCF). The event lasted for 120 minutes, and was due to cool down of K7000 LPS compressor for planned work. A flaring event occurred at GCI starting at 11/18/2014 18:24 and stopping at 11/18/2014 23:07 with a volume of 460 (MSCF). The event lasted for 283 minutes, and was due to annex shutdown and associated flaring for depressure. A flaring event occurred at GC1 starting at 11/19/2014 09:00 and stopping at 11/19/2014 20:30 with a volume of 6580 (MSCF). The event lasted for 690 minutes. The event had a volume greater than 5000 (MSCF), and was due to trip of GILT compressor due to power load shedding s/d. Flaring stopped when power was restored and the plant restarted. A flaring event occurred at GCI starting at 11/20/2014 01:00 and stopping at 11/20/2014 06:30 with a volume of 2920 (MSCF). The event lasted for 330 minutes, and was due to backout of LP/IP compressors from transit system due to performance issues. A flaring event occurred at GC1 starting at 11/21/2014 07:00 and stopping at 11/22/2014 with a volume of 6180 (MSCF). The event lasted for 1020 minutes. The event had a volume greater than 5000 (MSCF), and was due to backout of LP/IP compressors from transit system due to performance issues. A flaring event occurred at GC2 starting at 11/17/2014 00:07 and stopping at 11/17/2014 01:30 with a volume of 231 (MSCF). The event lasted for 83 minutes, and was due to ambient -driven fluctuations in transit gas line pressure. Flaring stopped when production rates were cut. A flaring event occurred at FS1 starting at 11/19/2014 15:00 and stopping at 11/19/2014 17:45 with a volume of 974 (MSCF). The event lasted for 165 minutes, and was due to STWIP 1802 compressor shutdown to allow for testing of new STV/IP compressor 1825. A flaring event occurred at FS1 starting at 11/21/2014 08:00 and stopping at 11/21/2014 18:50 with a volume of 3611 (MSCF). The event lasted for 650 minutes, and was due to STV/IP 1802 compressor shutdown to allow for testing of new STV/IP compressor 1825.. A flaring event occurred at FS1 starting at 11/22/2014 10:25 and stopping at 11/22/2014 19:46 with a volume of 6234 (MSCF). The event lasted for 561 minutes. The event had a volume greater than 5000 (MSCF), and was due to STV/IP 1802 compressor shutdown to allow for testing of new STV/IP compressor 1825. Please let me know if you have any questions. Kellie Okonek PCC/EOC Production Optimization TL Office: (907) 659-4472 Cell: (907) 382-1370 akopspcceoctl(@bp.com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION RECEIVED JAN 16 2015 AOGVV 1. Facility Number --IT—FU—acility 0290000031 Name PBGC 1 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition December -2014 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume, 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected D PRUDHOE 640150 99.48% LISBURNE 640144 0.23% 8. Flared or vented 1 hour or less 330 MIDNIGHT SUN 640158 0.29% PT MCINTYRE 640180 0.00% 9. Flared or vented more than 1 hour (see inslr.) 7,040 10. Pilot and Purge 57,152 11. Assist Gas 0 12. Fuel gas used in lease operations. 773,126 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6.12) 837,648 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 18. Transferred to: (Express as a negative #) CGF -71,402,261 Commissioner Date 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. if >n Note. All volumes must be corrected Signature (.1if �t Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a U temperature of 60o F. Authority 20 Printed Name Diane Colle Phone (907) 564-5775 Date AAC25.235. Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT -GC -1 GAS FLARING INCIDENT REPORT December 2014 JAN 16 2015 DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 12/13/2014 1500-1528 330 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr 1,990 TOTAL 330 7,040 DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 12/5/2014 1430-2300 5,050 See attachments See attachments 12/15/2014 1604-1748 1,990 TOTAL 7,040 Planned Events Less Than or Equal 1 Hour AND <= 5.000 mcf TOTAL TOTAL Unplanned Events < 1 Hour Unplanned Events > 1 Hour Planned Events < I hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments A See attachments 0 TOTAL 330 7,040 0 0 57,152 0 64,522 See attachments ACTION TAKEN TO ELIMINATE CAUSE See attachments Page 6 1/14/2015 10:49 AM