STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000032
2. Facility Name
PBU GC 2
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
January -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. ReinjectedO
PRUDHOE 640150 94.31%
AURORA 640120 1.20%
8. Flared or vented 1 hour or less
328
BOREALIS 640130 3.62%
ORION 640135 0.44%
9. Flared or vented more than 1 hour (see instr.)
0
POLARIS 640160 0.43%
10. Pilot and Purge
28,554
11, Assist Gas
0
12. Fuel gas used in lease operations.
656,974
13. Other (see instructions)
U
Official Use Only
Authorization >t hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
685,856
Lease Use
MCF
15, NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
Waste
MCF
17. Transferred from:
0
16. Transferred to: (Express as a negative #) CGF
-21,157,491
Commissioner Date
19. Remarks.
I hereby certify that the foregoing is true and correct to the best of my knowledge.
lrnM f Note: All volumes must be corrected
Signature AG(C,4rf U Title Manager Production Taxes and Rovalties Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date 41M AAC25.235.
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. FacilityNumber2.
0290000032
Facility Name
PBU GC 2
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
February -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 92.83%
AURORA 640120 2.10%
8. Flared or vented 1 hour or less
9 722
BOREALIS 640130 3.78°/
ORION 640135 0,55%
9. Flared or vented more than 1 hour (see instr)
436,111
POLARIS 640160 0.74 %
10. Pilot and Purge
24,976
11. Assist Gas
0
12. Fuel gas used in lease operations.
351,502
13. Other (see instructions)
0
Official Use Only
Authorization >t hr :
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
822,311
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
Cornmissioner Date/ -i
18. Transferred to: (Express as a negative #) CGF
-14,169,427
19. Remarks:
I hereby certify that the foregoing istrue and correct to the best of my knowledge.
r / r M//n I/1 Note: All volumes must be corrected
Signature (--t. A./i/JtX l Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date J10liq AAC25.235.
1/t- I--
6.1,7114 G/,7/14
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -2
GAS FLARING INCIDENT REPORT
February 2014
Page 8
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT& CAUSE -
ACTION TAKEN TO ELIMINATE CAUSE
2/15/2014
0425-0505
9,722 Not required for unplanned events <=1 hr
Not required for unplanned events <=1 hr
2/16-19/2014
TOTAL
9,722
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
2/15/2014
0505-2305
34,236 See Attachments
See Attachments
2/16-19/2014
0300-0810
401,875
TOTAL
436,111
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
See Attachments
TOTAL
0
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
See Attachments
TOTAL
0
TOTAL
Unplanned Events < 1 Hour
9,722
Unplanned Events > 1 Hour
436,111
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
24,976
Assist
0
TOTAL FLARED VOLUME
470,809
3/12/2014
4:56 PM
Flare Start Date 02/01/2014
Flare End Date 02/28/2014
GC2 Flare Report Total Volume (MSCF) 445833
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
14-48 Flare Relief 02/15/2014 5:05:00 am 1:30:00 pm 505 min No No No
Determination Cause
LPS compressor K-7000 shut down because of a problem associated with Hi speed trip
Action Taken
Reduced rates and shut in and freeze protected Ip wells
14-48 Flare Relief 02/15/2014 1:30:00 pm 11:05:00 pm 575 min No No No
Determination Cause
LPS compressor K-7000 shut down because of a problem associated with Hi speed trip
Action Taken
Reduced rates and shut in and freeze protected 1p wells
14-49 Flare Relief 02/16/2014 3:00:00 am 12:00:00 am 1260 min No No No
Determination Cause
LPS compressor K-7000 shut down because of a problem associated with Hio speed trip
Action Taken
Reduced rates and freeze protected wells, maintained minimum flows to keep facility from freezing
14-52 Flare Relief 02/17/2014 12:00:00 am 12:00:00 am 1440 min No No No
Determination Cause LPS compressor K-7000 shut down because of a problem associated with Hi Speed ncozle clevis
Action Taken Reduced rates to minimum required for facility freeze protect, shut in wells and FP
14-55 Flare Relief 02/18/2014 12:00:00 am 120000 am 1440 min No No No
Determination Cause LPS compressor K-7000 shut down because of a problem associated with hi -speed nozzle clevis
Action Taken Shut in and F/P wells and reduced rates to minimum for facility freeze protection
14-56 Flare Relief 02/19/2014 12:00:00 am 8:10:00 am 490 min No No Yes
Determination Cause LPS compressor K-7000 and K-7001 shut down due to a problem associated with Waste Heat.
Action Taken Started K-7001
BP1\SQUIP2 12274
BPI\SQUIP2 21962
BP7\SQUIP2 109375
BP1\SQUIP2 125000
BP1\SQUIP2 125000
BP1\LOTTCE 42500
Total Volume (MSCF) 445833
Generated 03/04/2014 2:15:08PM Page 8 of 9
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj
Sent: Tuesday, February 18, 2014 9:47 AM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; Kruger, Dale O; AK, OPS GC2 OSM; AK, OPS GC2 Facility OTL; AK, OPS
PCC EOC TL; AKHSSEEEnvAdvWest@bp.com
Subject: Gas flaring events at GC2
To: Jennifer Hunt, AOGCC
Jennifer hunt(c alaska.gov
CC: Dave Roby, AOGCC
dave roby(cbalaska.00v
From: Kellie Okonek, GPB Production Optimization Team Leader
CC: Victoria Ferguson, AOGCC
victoria ferouson@alaska.gov
A flaring event occurred at GC2 starting at 02/15/2014 13:30 and stopping at 02/15/2014 23:05 with a volume of 21962
(MSCF). The event lasted for 575 minutes. The event had a volume greater than 5000 (MSCF).
A Flaring event occurred at GC2 starting at 02/15/2014 05:05 and stopping at 02/15/2014 13:30 with a volume of 12274
(MSCF). The event lasted for 505 minutes. The event had a volume greater than 5000 (MSCF).
A flaring event occurred at GC2 starting at 02/15/2014 04:25 and stopping at 02/15/2014 05:05 with a volume of 9722
(MSCF). The event had a volume greater than 5000 (MSCF).
A flaring event occurred at GC2 starting at 02/17/2014 00:00 and stopping at 02/18/2014 with a volume of 125000
(MSCF). The event lasted for 1440 minutes. The event had a volume greater than 5000 (MSCF).
A flaring event occurred at GC2 starting at 02/16/2014 03:00 and stopping at 02/17/2014 with a volume of 109375
(MSCF). The event lasted for 1260 minutes. The event had a volume greater than 5000 (MSCF).
These events were due to LPS K7000 compressor shutdown due to high speed trip. K7001 was already down for
planned maintenance, so rates were reduced to minimum rates necessary to keep piping warm until freeze protect could
be complete.
Please let me know if you have any questions.
Kellie Okonek (alt. Travis Rybicki)
PCC/EOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 382 1370 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akopspcceoctl(a)bp com
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent: Tuesday, March 04, 2014 1:41 PM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; Kruger, Dale O; AK, OPS GC2 OSM; AK, OPS GC2 Facility OTL; AK,
HSSEE Env Adv West
Subject: Gas flaring events at GC2
To: Jennifer Hunt, AOGCC
jennifer hunt@alaska oov
CC: Dave Roby, AOGCC
dave roby(a)alaska.gov
From: Travis Rybicki, GPB Production Optimization Team Leader
CC: Victoria Ferguson, AOGCC
victoria.ferguson@alaska.gov
A flaring event occurred at GC2 starting at 02/18/2014 00:00 and stopping at 02/19/2014 with a volume of 125000
(MSCF). The event lasted for 1440 minutes. The event continued into the following day.
A flaring event occurred at GC2 starting at 02/19/2014 00:00 and stopping at 02/19/2014 08:10 with a volume of 42500
(MSCF). The event lasted for 490 minutes. Flaring continued until offline LPS T/C K7001 was started after completion of
planned overhaul maintenance work. Flaring ended when the unit was started, loaded and the flare valves closed.
These events were due to LPS K7000 compressor shutdown due to high speed trip. K70ol was already down for
planned maintenance, so rates were reduced to minimum rates necessary to keep piping warm until freeze protect could
be complete.
Please let me know if you have any questions.
Travis M. Rybicki
PCC-EOC (Production optimization) ream Lead
Office 907-659-4472 (BOC) 659-5566 (PBOC)
Cell 907-227-8133 Harmony 758-4404
GPB Pager 907-659-5272 # 1890
akopspcceoctl(obp. Com
Alternate: Kellie Okonek
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000032
2. Facility Name
PBU l 2
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
March -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 91.00%
AURORA 640120 2.35%
8. Flared or vented l hour or less
0
BOREALIS 640130 5.43%
ORION 640135 0.51%
9. Flared or vented more than 1 hour (see instr.)
0
POLARIS 640160 0.71%
10. Pilot and Purge
25,390
11. Assist Gas
0
12. Fuel gas used in lease operations.
552,394
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
577,784
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-18,762,157
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
y�i]]�� �///�1�1��,//t��%gg/
Signature 81b eaw Title Marm er Production Taxes and Royalties Alaska
Note: Alf volumes must be corrected
to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
AAC25.235.
// //
Printed Name Diane ColleyPhone (907) 564-5775 Date N
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number2.
0290000032
Facility Name
PBU GC 2
3. Field
PBU - WOA
4. Operator
JBP
5. MonthNear of Disposition
I April -2014
Disposition
Volume MCF
20. Forproduchon from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Q
Pool Name Pool Code Percent
7. Reinjected
Q
PRUDHOE 640150 91.92%
AURORA 640120 1.98%
8. Flared or vented hour or less
1,267
BOREALIS 640130 4.67°/
ORION 640135 0.48%
9. Flared or vented more than 1 hour (see instr.)
8,609
POLARIS 640160 0.95%
10. Pilot and Purge
24,945
11. Assist Gas
Q
12. Fuel gas used in lease operations.
570,222
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr.
Safety
!O
14. TOTAL VOLUME (ITEMS 6-12)
605,063
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
Q
Waste:
MCF
17. Transferred from:
Q
/ _A
U-thV
18. Transferred to: (Express as a negative #) CGF
-17,814,126
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
�j�� //j/!/I,/(y/,Jl�
Signature e/ Y �"'" V Title Manager Production Taxes and Royalties Alaska
Note: All volumes must be corrected
to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
AAC25.235.
/_
Printed Name Diane ColleyPhone (907) 564-5775 Date �/ `�
Vt-
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRU DHOE BAY UNIT - GC -2
GAS FLARING INCIDENT REPORT
April 2014
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
4/1/2014 2335-2337 69 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
4/10/2014 2035-2055 278
4/14/2014 0430-0443 135
4/20/2014 0750-0811 292
4/28/2014 1535-1606 332
TOTAL 1,106
4/21/2014 0055-0415 1,262 See Attachments See Attachments
4/25/2014 0950-1052 431
4/30/2014 1055-1905 6,465
TOTAL 8,158
4/27/2014 1637-1651 97 See Attachments See Attachments
4/29/2014 1121-1132 84
TOTAL 181
Page 7
4/27/2014 1432-1537 451 See Attachments See Attachments
TOTAL 451
TOTAL
Unplanned Events < 1 Hour 1,106
Unplanned Events > 1 Hour 8,158
Planned Events < 1 hour and not 181
exceeding 5,000 NICE
Planned Events> 1 hour or 451 V
exceeding 5,000 MCF
Pilot Purge 24,945
Assist 0
TOTAL FLARED VOLUME 34,841 5/15/2014
10:51 AM
Flare Start Date 04/01/2014
Flare End Date 04/30/2014
GC2 Flare Report Total Volume (MSCF) 9896
Report
Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
14-132 Flare Relief 04/21/2014 12:55:00 am 4:15:00 am 200 min No No
Determination Cause LPS compressor K-7000 shut down because of water wash
Action Taken WOA reduced production rates and shut-in wells for water wash of LPS compresser
14-134 Flare Relief 04/25/2014 9:50:00 am 10:52:00 am 62 min No No
Determination Cause LPS Compressor K-7000 sprang water wash.
Action Taken Water Wash complete.
14-137 Flare Relief 04/27/2014 2:32:00 pm 3:37:00 pm 65 min No No
Determination Cause LPS Compressor K-7001 water wash.
Action Taken Water wash complete.
No 131`1\LEGNJB 1262
No BP11STYVJW 431
Yes BP1\PAOLINJM 451
14-137 Flare Relief 04/27/2014 4:37:00 pm 4:51:00 pm 14 min No No Yes BPI\PAOLINJM 97
Determination Cause Start up K-7001 after spring water wash.
Action Taken K-7001 started.
14-139 Flare Relief 04/29/2014 11:21:00 am 11:32:00 am 11 min No No Yes BPI\PAOLINJM 84
Determination Cause Startup of LPS Compressor K-7001, Copus discharge gas to flare.
Action Taken LPS Compressor up and and in service.
14-140 Flare Relief 04/30/2014 10:55:00 am 7:05:00 pm 490 min No Yes No BP1\SQUIP2 ` 465
Generated 05/05/2014 10:32:25AM Page 7 of 9
Flare Start Date 04/01/2014
Flare End Date 04130/2014
Determination Cause LP 8 IP compressor problems due to low rate while dealing with H Pad shut in.
Action Taken Flaring was permitted to continue while GC operations personnel cycled safety trip reset on LP compressor.
Total Volume (MSCF) 9896
Generated 05/05/2014 10:32:25AM Page 8 Of 9
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000032
2. Facility Name
IP GC 2
3. Field
PBU - WOA
4. Operator
BP
5. MomhNear of Disposition
Ma -2014
Disposition
Volume MCF
20. Forproduction from multiplepools, list contribution ofeach poolas apercentof
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 91.58%
AURORA 640120 2.203/o
8. Flared or vented 1 hour or less
0
BOREALIS 640130 4.57%
ORION 640135 0.71%
9. Flared or vented more than 1 hour (see instr.)
11,191
POLARIS 640160 0.94%
10. Pilot and Purge
34,521
11. Assist Gas
0
12. Fuel gas used in lease operations.
481,537
13. Other (see instructions)
0
Official Use Only
Authorization >I hr.
Safety
� l / q /
MCF
14. TOTAL VOLUME (ITEMS 6-12)
527,249
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from:
0
1 —2-4_
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-13,825,162
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature LM L�U.!l�iV V Title Manager Production Taxes and Royalties Alaska
Note: All volumes must be corrected
to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
AAC25.235.
)r
Printed Name Diane ColleyPhone (907) 564-5775 Date /
r -/-z t- / 14
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT -GC -2
GAS FLARING INCIDENT REPORT
May 2014
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
Not required for unplanned events <= 1 hr
TOTAL 0
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
5/13/2014
0823-1115
4,777 See Attachments
5/23/2014
1001-1444
6,289
5/25/2014
0115-0245
125
TOTAL
TOTAL
11,191
Planned Events Less Than or Eoual 1 Hour AND <= 5.000 mcf
Not required for unplanned events <= 1 hr
ACTION TAKEN TO ELIMINATE
See Attachments
Page 8
TOTAL
See Attachments
0
See Attachments
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
See Attachments
TOTAL
0
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events> 1 Hour
11,191
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
34,521
Assist
0
TOTAL FLARED VOLUME
45,712
6/12/2014
10:40 AM
Flare Start Date 05/01/2014
Flare End Date 05/31/2014
GC2 Flare Report Total Volume (MSCF) 11191
Report
Numbs System
Date Start Time Stop Time Duration Intermittent Black Smoke
Planned Reported By Volume
14-162 Flare Relief 05/13/2014 8:23:00 am 11:15:00 am 172 min Yes No
No BPl\WALGAB 4777
Determination Cause
IP compressor shut down because of a problem associated with quad log fault
Action Taken
Equipment was restarted at 1115 hours.
14-171 Flare Relief 05/23/2014 10:01:00 am 2:44:00 pm 283 min Yes Yes
No BP1\STYVJW 6289
Determination Cause
STOP PRODUCTION oocured during a PLC work on PWX, cause under investigation.
Action Taken
PLC work complete, facility retunred to production.
14-175 Flare Relief 05/25/2014 1:15:00 am 2:45:00 am 90 min No No
No BP1\PAOLINJM 125
Determination Cause
Depressured Q-01, 02 and 03 to flare via test bank for maintenance on the well pad.
Action Taken
Amlines depressured and flare valve closed.
Total Volume (MSCF) 11191
Generated 06/03/2014 9:13:32AM Page 9 of 10
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000032
2. Facility Name
PBU GC 2
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
June -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
O
Pool Name Pool Code Percent
7. Reinjected
O
PRUDHOE 640150 93.78%
AURORA 640120 2.14%
8. Flared or vented 1 hour or less
3,162
BOREALIS 640130 2.95%
ORION 640135 0.40%
9. Flared or vented more than 1 hour (see instr.)
606
POLARIS 640160 0.733/6
10. Pilot and Purge
30,128
11. Assist Gas
0
12. Fuel gas used in lease operations.
620,456
13. Other (see instructions)
U
Use Only
Authorization
tion >7 hr:
Safety
� U
MCF
14. TOTAL VOLUME (ITEMS 6-12)
654,352
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from:
U
-3
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-18,970,470
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Mr'1�� Note: All volumes must be corrected
Signature N tl (..(,� Title Mana er Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date 7 /I/ L I AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- GC -2
GAS FLARING INCIDENT REPORT Page 7
June 2014
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE LAUSE
6/23/2014 1157-1219
183
Not required for unplanned events <= 1 hr
Not required for unplanned events <= 1 hr
6/24/2014 0754-0758
14
Planned Events > 1 hour or
0
6/29/2014 0904-0911
340
Pilot Purge
30,128
6/29/2014 1031-1113
2,625
TOTAL FLARED VOLUME
33,896
TOTAL
3,162
Unplanned Events greater than 1 hour
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
6/23/2014 0727-0916
606
See Attachments
See Attachments
TOTAL
606
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
See Attachments
TOTAL
0
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
See Attachments
TOTAL 0
7/16/2014
1:45 PM
TOTAL
Unplanned Events < 1 Hour
3,162
Unplanned Events> 1 Hour
606
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
30,128
Assist
0
TOTAL FLARED VOLUME
33,896
7/16/2014
1:45 PM
Flare Start Date 06/01/2014
Flare End Date 06/30/2014
M Flare Report Total Volume (MSCF) 3766
Report
Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
14-210 Flare Relief 06/23/2014 7:27:00 am 9:16:00 am 109 min Yes No No BPi1STYVJW 606
Determination Cause High gas transit line pressure caused by a increase in ambient temps 8 GLT compressor (Big AL) shutting down.
Action Taken Production rate were lowered and GLT machine was (BIG AL) brought back online.
Total Volume (MSCF) 3768
Generated 07/09/2014 3:12:32PM Page 7 of 7
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000032
2. Facility Name
PBU GC 2
3. Field
PBU - WOA
4. Operator
BP
5. Month/Year of Disposition
July -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 94.55%
AURORA 640120 1.04%
8. Flared or vented ihour or less
1,711
BOREALIS 640130 3.68%
ORION 640135 0.51%
9. Flared or vented more than 1 hour (see instr.)
7812
POLARIS 640160 0.22%
10. Pilotand Purge
17,941
11, Assist Gas
0
12. Fuel gas used in lease operations.
339,453
13. Other (see instructions)
0
Official Use Only
Authorization >7 hr:
Safety
! Z
MCF
74. TOTAL VOLUME (ITEMS 6-12)
366,917
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
!
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-10,818,717
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature u// GL Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
/ , temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date �I AAC25.235.
VI,r
Form 1OA22 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT -GC -2
GAS FLARING INCIDENT REPORT
July 2014
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
7/10/2014 2240-2255 20 Not required for unplanned events <=1 hr Not required for unplanned events <= 1 hr
7/17/2014 0122-0219 1,583
TOTAL 1,603
Page 8
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
7/12/2014
2115-2230
7,812 See Attachments
See Attachments
TOTAL
7,812
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
7/17/2014
2306-2332
108 See Attachments
See Attachments
TOTAL
108
DATE
TOTAL
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
0
TOTAL
1,603
7,812
108
0
17,941
0
27,464
DESCRIPTION OF INCIDENT & CAUSE
See Attachments
See Attachments
8/14/2014
2:23 PM
Flare Start Date 07/01/2014
Flare End Date 07/31/2014
GC2 Flare Report
Total Volume (MSCF) 9523
Report
Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
14-243 Flare Relief 07/12/2014 9:15:00 pm 10:30:00 pm 75 min No
Determination Cause High ambient temps
Action Taken EOA reduced production
No No BPI\WALLC7 7812
14-248 Flare Relief 07/17/2014 11:06:00 pm 11:32:00 pm 26 min Yes No Yes BP1\PAOLINJM 108
Determination Cause Plant coming down for TAR, low gas rates caused LP and IP compressors to loose forward bow, flared off LP knockout.
Action Taken Shut compressors down, no flow into plant Flare valves closed.
Total Volume (MSCF) 9523
Generated 08/04/2014 11:24:17AM Page 10 of 11
Hunt, Jennifer L (DOA
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj
Sent: Sunday, July 20, 2014 12:30 PM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, HSSEE Env Adv West; Kruger, Dale O; AK, OPS GC1 Facility OTL; AK,
OPS GC1 OSM; AK, OPS GC2 OSM; AK, OPS GC2 Facility OTL; AK, OPS GC3 Facility &
Field OTL; AK, OPS GC3&PCC OSM
Subject: Gas flaring events at GC1,090 GC3
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
iennifer hunt(6alaska.gov dave.robv(a)alaska.aov victoria ferousone-alaska.aov
From: Kellie Okonek, GPB Production Optimization Team Leader
GC1
A flaring event occurred at GCI starting at 06/17/2014 03:00 and stopping at 06/18/2014 with a volume of 1090 (MSCF).
The event lasted for 1260 minutes, and was due to LP compressor instability due to temperature swings. Flaring stopped
when necessary process changes were made.
A flaring event occurred at GC1 starting at 06/20/2014 05:08 and stopping at 06/21/2014 with a volume of 2616 (MSCF).
The event lasted for 1132 minutes, and was due to low oil throughput causing insufficient LP/IP gas.
A flaring event occurred at GC1 starting at 06/21/2014 00:00 and stopping at 06/21/2014 05:25 with a volume of 2408
(MSCF). The event lasted for 325 minutes, and was due to low oil throughput causing insufficient LP/IP gas.
A flaring event occurred at GC1 starting at 06/23/2014 14:10 and stopping at 06/23/2014 15:45 with a volume of 1200
(MSCF). The event lasted for 95 minutes, and was due to a blown UPS fuse causing an LPS compressor shutdown.
Flaring stopped when the compressor was re -loaded.
A flaring event occurred at GC1 starting at 06/25/2014 08:45 and stopping at 06/25/2014 10:00 with a volume of 1437
(MSCF). The event lasted for 75 minutes, and was due to an unplanned shutdown of A/B banks to the GCI annex.
Flaring stopped when the banks were put back in service.
A flaring event occurred at GC1 starting at 07/02/2014 00:01 and stopping at 07/03/2014 with a volume of 3400 (MSCF).
The event lasted for 1439 minutes, and was due to a UPS power failure to the skid 7 control room. Flaring stopped when
UPS was fixed and power restored.
A flaring event occurred at GC1 starting at 07/03/2014 00:01 and stopping at 07/03/2014 06:30 with a volume of 1600
(MSCF). The event lasted for 389 minutes, and was due to a UPS power failure to the skid 7 control room. Flaring
stopped when UPS was fixed and power restored.
A flaring event occurred at GC1 starting at 07/04/2014 06:00 and stopping at 07/04/2014 12:00 with a volume of 280
(MSCF). The event lasted for 360 minutes, and was due to 2 stage D -bank backpressure controller issues. Flaring
stopped when the backpressure controller was re -adjusted.
A flaring event occurred at GC1 starting at 07/08/2014 04:00 and stopping at 07/08/2014 22:30 with a volume of 940
(MSCF). The event lasted for 1110 minutes, and was due to loss of forward flow on IP compressors. Flaring stopped
when temperature/pressure adjustments made to re-establish flow.
A flaring event occurred at GC1 starting at 07/17/2014 18:00 and stopping at 07/18/2014 with a volume of 8170 (MSCF).
The event lasted for 360 minutes. The event had a volume greater than 5000 (MSCF), and was due to depressurization of
Y/P pads for safe -out. Flaring stopped when depressurization was complete.
A flaring event occurred at GC1 starting at 07/18/2014 04:00 and stopping at 07/19/2014 with a volume of 6886 (MSCF).
The event lasted for 1200 minutes. The event had a volume greater than 5000 (MSCF), and was due to shutdown and
depressure of GHX tie -line between GC1 &2 for GC2 planned turnaround.
GC2
A flaring event occurred at GC2 starting at 06/23/2014 07:27 and stopping at 06/23/2014 09:16 with a volume of 606
(MSCF). The event lasted for 109 minutes, and was due to high gas transit pressure caused by an increase in ambient
temperatures and EOA 1806 compressor shutdown.
A flaring event occurred at GC2 starting at 07/12/2014 21:15 and stopping at 07/12/2014 22:30 with a volume of 7812
(MSCF). The event lasted for 75 minutes. The event had a volume greater than 5000 (MSCF), and was due to high
ambient temperatures causing transit gas system issues. Flaring stopped when rates were cut on the EOA.
GC3
A flaring event occurred at GC3 starting at 07/19/2014 14:48 and stopping at 07/19/2014 17:35 with a volume of 1160
(MSCF). The event lasted for 167 minutes, and was due to wet gas compressor shutdown due to control/instrumentation
failure associated with a fault. Production was reduced to minimize flaring.
Please let me know if you have any questions.
Kellie Okonek (alt. Travis Rybicki)
PCCIEOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 382 1370 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akoosocceoctl U)bo com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Peen 1Tv REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name
0290000032 PBU GC 2
Disposition
3. Field
PBU - WOA
Volume MCF
4. Operator 5. MonthNear of Disposition
BP August -2014
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
AURORA 640120 0.00%
8. Flared or vented 1 hour or less
0
BOREALIS 640130 0.00%
ORION 640135 0.00%
9. Flared or vented more than 1 hour (see instr.)
0
POLARIS 640160 0.00%
10. Pilot and Purge
10,276
11. Assist Gas
0
12. Fuel gas used in lease operations.
15,933
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
26,209
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-147,250
19. Remarks:
I hereby certify that a foregoing is t e an mact to the best of my knowledge.
Signature Title Manager Production Taxes and Ro alties Alaska
Printed Name Diane Colley Phone (907) 564-5775 Date %11q
Note: All volumes must be corrected
to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000032
2. Facility Name
PBU GC 2
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
September -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Cade Percent
7. Reinjected
U
PRUDHOE 640150 93.35%
AURORA 640120 1.08%
8. Flared or vented 1 hour or less
153
BOREALIS 640130 4.87%
ORION 640135 0.35%
9. Flared or vented more than 1 hour (see instr.)
51,319
POLARIS 640160 0.35°/
10. Pilot and Purge
30,276
11. Assist Gas
0
12. Fuel gas used in lease operations.
541,218
13. Other (see instructions)
0
Official Use Only
Authorization >t hr:
Safety
✓
MCF
14. TOTAL VOLUME (ITEMS 6.12)
622,966
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
3-2-3—/S-
-Z3/S'18.
Commissioner Date
18, Transferred to: (Express as a negative #) CGF
-14,996,275
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
n (
Signature `� "]�,i' Title Manager Production Taxes and Ro allies Alaska
Note: All volumes must corrected
to pressure of 14.65 psisis and to a
temperature of 60o F. Authority 20
AAC25.235.
��
Printed Name Diane Co Phone (907) 564-5775 Date t— (�
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -2
GAS FLARING INCIDENT REPORT
September 2014
Unplanned Events less than or equal to 1 hour
DATE TIME E R4LTI£fN.TM1KENTi?#GINEINEkTEAi1S£
9/13/2014 1658-1714 111 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
9/26/2014 1018-1028 42
TOTAL 153
Page 1
uA1F
;:ttma.:
VULUNI[ }1C>4i{rrS lvry Vr
+anFn
9/1/2014
0600-2349
11,878 See Attachments
See Attachments
9/2/2014
0001-2359
11,983
9/3/2014
1400-2230
2,833
9/16/2014
1345-1500
260
9/27/2014
1000-2045
18,365
TOTAL
45,319
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE
TIME
VOLUME Oe54AMIitN O:)'1AICL(]�N1'<Si A15F
ACTION TAkEif
9/7/2014
See Attachments
See Attachments
TOTAL
0
Planned Events Exceeding 1 Hour OR > S,000 mcf
DATE
T3ME
V1.OLUME DESCRIPTION OF MCHJENT;& A.USE
? ACfiQNTAMEN T4ELIM(INATE W.,.. .. ., ,:.
0730-2330
6,000 See Attachments
See Attachments
TOTAL
6,000
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
153
45,319
0
6,000
30,276
a
81,748
10/16/2014
10:35 AM
Flare StartDate 09/01/2014
Flare End Date 09/30/2014
14-380 Flare Relief 09/16/2014 1:45:00 pm 3:00:00 pm 75 min No
Determination Cause Tandem Compressor down for mail. Gas header up to 630#
Action Taken EOA & WOA cut rates _
No No
14-392 Flare Relief 09/27/2014 10:00:00 am 8:45:00 pm 645 min Yes No
Determination Cause IP and LP compressor shut down due to hydration of gas plant outlet pipe
Action Taken Equipment was restarted
BPI\WALLC7 260
No BP1\WALGAB 18365
Total Volume (MSCF) 51472
Page 10 of 10
Generated 10/02/2014 2:36:16PM
GC2 Flare Report
Total Volume (MSCF) 51472
Report
Date Start Time Stop Time Duration Intermittent
Black Smoke Planned Reported By Volume
Numbe System
14-340 Flare Relief 09/01/2014 6:00:00 am 11:49:00 pm 1069 min Yes
Yes No BP1\STYVJW 11878
Determination Cause
IP compressor shut down because of a problem associated with start up.
Action Taken
On going problems associated with start up.
14-345 Flare Relief 09/02/2014 12:01:00 am 11:59:00 pm 1438 min Yes
Yes No BP1\STYVJW 11983
Determination Cause
IP compressor shut down because of a problem associated with startup.
Action Taken
On going problems associated with start up.— _
— __----
14-348 Flare Relief
09/03/2014 2:00:00 pm 10:30:00 pm 510 min No
No No SP1\WALLC7 2833
Determination Cause
K207 IP compressor shutdown for vibration and leaky zerk
Action Taken
Repaired compressor _ – _ _.
_-------- –
14-381 Flare Relief 08/07/2014 7:30:00 am 11:30:00 pm 960 min No
No Yes BP1\WALLC7 6000
ESD testing of plant and field devices. This shutdown the facility and then the facility was restarted.
Determination Cause
Action Taken
Restarted the plant.
. -- ---- ---- ---- --_
14-380 Flare Relief 09/16/2014 1:45:00 pm 3:00:00 pm 75 min No
Determination Cause Tandem Compressor down for mail. Gas header up to 630#
Action Taken EOA & WOA cut rates _
No No
14-392 Flare Relief 09/27/2014 10:00:00 am 8:45:00 pm 645 min Yes No
Determination Cause IP and LP compressor shut down due to hydration of gas plant outlet pipe
Action Taken Equipment was restarted
BPI\WALLC7 260
No BP1\WALGAB 18365
Total Volume (MSCF) 51472
Page 10 of 10
Generated 10/02/2014 2:36:16PM
Hunt Jennifer L (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com)
Sent: Tuesday, September 16, 2014 11:36 AM
To: Hunt, Jennifer L (DOA)
Cc: Roby, David S (DOA); Ferguson, Victoria L (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; Kruger, Dale O; AK, OPS GC3&PCC OSM; AK, OPS GC2 OSM; AK, OPS
GC2 Facility OTL; AK, OPS PCC/EOC Process Engineer
Subject: Flaring Events at GC2
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson,
AOGCC
iennifer.hunt@alaska.gov dave roby(aalaska.gov
victoria ferguson2ilalaska gov
From: Wendy Hiester, GPB Production Optimization Team Leader
In the first half of September, the following flaring events occurred at GC2. The majority of the flaring occurred due to
start-up of GC2:
9/13
A flaring event occurred at GC2 starting at 09/13/2014 16:58 and stopping at 09/13/2014 17:14 with a volume of 111
(MSCF). The event lasted for 16 minutes. Flaring was due to high transit line pressures caused by CCP compressor
problems due to loss of tandems. The WOA reduced production rates to stop the flaring.
9/7
A flaring event occurred at GC2 starting at 09/07/2014 07:30 and stopping at 09/07/2014 23:30 with a volume of 6000
(MSCF). The event lasted for 960 minutes. The event had a volume greater than 5000 (MSCF). Flaring was caused by ESD
testing of plant and field devices. GC2 was shut down and restarted for the ESD testing. The flaring stopped when GC2
was restarted.
9/3
A flaring event occurred at GC2 starting at 09/03/2014 14:00 and stopping at 09/03/2014 22:30 with a volume of 2833
(MSCF). The event lasted for 510 minutes. Flaring occurred when the K207 IP compressor was shutdown for repairs and
high vibration. Flaring stopped when the compressor was restarted.
9/2 A flaring event occurred at GC2 starting at 09/02/2014 00:01 and stopping at 09/02/2014 23:59 with a volume of
11983 (MSCF). The event lasted for 1438 minutes. The flaring occurred when the IP compressor shut down because of a
problem associated with GC2 start-up. The flaring stopped as start-up problems were resolved.
9/1 A flaring event occurred at GC2 starting at 09/01/2014 06:00 and stopping at 09/01/2014 23:49 with a volume of
11878 (MSCF). The event lasted for 1069 minutes. The flaring occurred when the IP compressor shut down because of a
problem associated with GC2 start-up. The flaring stopped as start-up problems were resolved.
Please let me know if you have any questions.
Wendy Hiester (alt. Kellie Okonek)
PCCIEOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 227-7144 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akoasocceoctl@ba com
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj
Sent: Sunday, September 28, 2014 11:46 PM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, HSSEE Env Adv West; Kruger, Dale O; AK, OPS GCI OSM; AK, OPS
GCI Facility OTL; AK, OPS PCC EOC TL; AK, OPS CGF OTL, AK, OPS CCP CGF OSM;
OPS FSI OSM; AK, PS FS1 FacilityH;
OTL; AK, SSEE Env Adv East Facility OTL; AK,
Subject: Gas flaring events at CGF, GCI INUmd FSI
Categories: Attention
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
iennifer hunt(oalaska.00v dave.robv@alaska.gov victoria ferauson(cDalaska.gov
From: Kellie Okonek, GPB Production Optimization Team Leader
A flaring event occurred at CGF starting at 09/24/2014 04:12 and stopping at 09/24/2014 05:23 with a volume of 13186
(MSCF). The event lasted for 71 minutes. The event had a volume greater than 5000 (MSCF), and was due to T/C 1805
shutdown due to pressure controller malfunction. Flaring stopped when the equipment was repaired and re -started.
A flaring event occurred at GC1 starting at 09/23/2014 11:06 and stopping at 09/23/2014 18:08 with a volume of 3650
(MSCF). The event lasted for 422 minutes, and was due of depressurization of the PM2 line for maintenance.
A flaring event occurred at GO starting at 09/22/2014 02:58 and stopping at 09/22/2014 08:50 with a volume of 6230
(MSCF). The event lasted for 352 minutes. The event had a volume greater than 5000 (MSCF), and was due to loss of K-
7001 compressor. Flaring stopped when K-7001 was repaired and re -started.
A flaring event occurred at GC1 starting at 09/21/2014 04:04 and stopping at 09/21/2014 22:33 with a volume of 574
(MSCF). The event lasted for 1109 minutes, and was due to high transit pressure. Flaring stopped when gas production
was stabilized.of 2485
A flaring event occurred
t GC1
arting
0/2014
(MSCF). The event lastedat
16:30
14
th
for 916minutes, 2 0
me
andwas due to high and
stopping pressure. F arinOg stopped wl hen gasu
production
was stabilized.
A flaring event occurred at GC1 starting at 09/19/2014 11:05 and stopping at 09/19/2014 21:40 with a volume of 64
(MSCF). The event lasted for 635 minutes, and was due to high transit pressure. Flaring stopped when gas production
was stabilized.
A flaring event occurred at GC1 starting at 09/17/2014 00:00 and stopping at 09/17/2014 21:48 with a volume of 914
(MSCF). The event lasted for 1308 minutes, and was due to high transit pressure. Flaring stopped when gas production
was stabilized.
A flaring event occurred at GCI starting at 09/16/2014 00:00 and stopping at 09/16/201414:40when volume of tion
36
(MSCF). The event lasted for 880 minutes, and was due to high transit pressure. Flaring stoppedg P
was stabilized..of 3649
A fring event occurred at GC1 ng at
The event lasted for 1440 minutes, rand was due to high trans t presssur:00 and e. Flaring stopped when gasng at 09/1/2014 with a1production was .
stabilized.
A flaring event occurred at FS1 starting at 09/27/2014 04:00 and stopping at 09/27/2014 23:15 with a volume of 6417
(MSCF). The event lasted for 1155 minutes. The event had a volume greater than 5000 (MSCF), and was due to T/C 1802
shutdown for planned maintenance.
t
A flaring event occurred at GC2 starting at 09/27/201410:00 and stopping at 09/27/2014 20:45 with a volume of 18365
(MSCF). The event lasted for 645 minutes. The event had a volume greater
stopped 5 whencompressorCF), and as duas e to I /LP
compressor shutdown due to hydrate formation on outlet piping. g PP
Please let me know if you have any questions.
Kellie Okonek
PCC/EOC Production Optimization TL
Office: (907) 659-4472
Cell: (907) 382-1370
kopspcceoctlPbn.com
2
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
DECEIVED
NOV 18 2014
AOGCC
1. Facility Number
0290000032
2. Facility Name
PBU GC 2
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
October -2014
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 90.79%
AURORA 640120 1.65°
8. Flared or vented 1 hour or less
270
BOREALIS 640130 6.12%
ORION 640135 0.81%
9. Flared or vented more than 1 hour (see instr.)
0
POLARIS 640160 0.63%
10. Pilot and Purge
30,976
11. Assist Gas
0
12. Fuel gas used in lease operations.
631,047
13. Other (see instructions)
0
Official Use Only
Authorization >i hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
662,293
—
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-16,859,522
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature dJf L9/ l .tA/YI'// Title Manager Production Taxes and Royalties Alaska
Note: All volumes must be corrected
to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
1 AAC25.235.
Printed Name Diane Colley Phone (907) 564-5775 Date 14
/1171
Farm 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
HP txPLUKAI IUN IALASKA71N(-.
PRUDHOE BAY UNIT - GC -2
GAS FLARING INCIDENT REPORT
October 2014
Not required for unplanned events <= 1 hr
TOTAL 0
See Attachments
TOTAL 0
I V F. Lf
NOV 1'20
F1614
Not required for unplanned events <= 1 hr
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
DATE
TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
10/5/2014
0815-0850
262
See Attachments
See Attachments
10/15/2014
1122-1153
8
Pilot Purge
30,976
TOTAL
270
TOTAL FLARED VOLUME
31,246
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE
TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
See Attachments
TOTAL
0
11/13/2014
2:39 PM
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events> 1 Hour
0
Planned Events < 1 hour and not
270
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
30,976
Assist
0
TOTAL FLARED VOLUME
31,246
11/13/2014
2:39 PM
Flare Start Date 10/01/2014
Flare End Date 10/31/2014
GC2 Flare Report
Total Volume (MSCF) 270
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
14-406 Flare Relief 10/05/2014 8:15:00 am 8:50:00 am 35 min No No
Determination Cause Spin cooled K-7000
for maintenance
Action Taken No response taken as this was deemed to be of short duration.
14-423 Flare Relief 10/15/2014 112200 am 11'.53:00 am 31 min No No
Determination Cause Test Bank, rate removed and vessel de -pressured for PSV isolation for PM's
Action Taken Vessel depressured to ZERO psi.
RECEIVi:u
NOV 18 2014
AOGCC
Yes BP1\EARLLC 262
Yes BPI\BRONTL 8
Total Volume (MSCF) 270
Generated 11/17/2014 9:25:27AM Page 9 of 10
DEC ] 6 2014
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION AOGCC
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000032
2. Facility Name
PBU GC 2
3. Field
PBU - WOA
4. Operator
BP
5. Month/Year of Disposition
November -2014
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
U
PRUDHOE 640150 93.20%
AURORA 640120 1.45%
8. Flared or vented 1 hour or less
986
BOREALIS 640130 4.25%
ORION 640135 0.62%
9. Flared or vented mom than 1 hour (see instr.)
231
POLARIS 640160 0.48%
10. Pilot and Purge
26,147
11. Assist Gas
0
12. Fuel gas used in lease operations.
649,354
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
� 3
MCF
14. TOTAL VOLUME (ITEMS 6-12)
676,718
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0,'�
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-20,017,929
,
19. Remarks:
egoing, is true and correct to the best of my knowledge.
I hereby certify thatn1m,
Note: All volumes must be corrected
Signature Title Manager Production Taxes and Royalties Alaska to pressure Of 14.65 psia and to a
/ // temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date / L AAC25.235.
ViL-
I/T/lam
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -2
GAS FLARING INCIDENT REPORT
November 2014
Page 8
Unplanned Events less than or equal to 1 hour
TOTAL
Unplanned Events < 1 Hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
11/11-12/2014 2350-0015
750 Not required for unplanned events <= 1 hr
Not required for unplanned events <= 1 hr
11/16/2014 2159-2213
97
0
11/19/2014 1825-1835
35
Pilot Purge
11/19/2014 2050-2305
104
0
TOTAL
986
Unplanned Events greater than 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
11/17/2014 0007-0130
231 See Attachments
See Attachments
TOTAL
231
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
See Attachments
TOTAL
0
DATE TIME VOLUME DESCRIPTION OF INCIDENT&CAUSE
See Attachments
TOTAL 0
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
12/11/2014
9:41 AM
TOTAL
Unplanned Events < 1 Hour
986
Unplanned Events > 1 Hour
231
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
26,147
Assist
0
TOTAL FLARED VOLUME
27,364
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
12/11/2014
9:41 AM
Flare Start Date 11/01/2014
Flare End Date 11/30/2014
GC2 Flare Report Total Volume (MSCF) 1217
Report
Numbe
System
Date start Time
Stop Time
Duration Intermittent Black Smoke Planned
Reported By Volume
RECEIVED
DEC 16 2014
14-072 Flare Relief 11/17/2014 12:07:008M 1:30:00 am 83 min Yes No
Determination Cause Ambient temperature swings resulted in fladrg and required cuts in production.
Action Taken EOA & WOA reduced production rates.
No BP1\STYVJW 231
Daily Volume (MSCF) 231
Total Volume (MSCF) 1217
Generated 12/02/2014 10:36:03AM Page 8 of 8
Hunt, Jennifer L (DOA)
From:
AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent:
Sunday, November 23, 2014 9:46 AM
To:
Hunt, Jennifer L (DOA)
Cc:
Loepp, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, HSSEE Env Adv West; Hauger, Wayne A; AK, OPS GC1 OSM; AK,
OPS GC2 OSM; AK, OPS GC1 Facility OTL; AK, OPS GC2 Facility OTL, AK, OPS PCC EOC
TL; AK, OPS FS1 Facility OTL; AK, OPS FSI OSM; Loader, Neil
Subject:
Gas flaring events at GC1,00FS1
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson,
AOGCC
iennifer.hunt(o)alaska.gov dave.robyno alaska.gov victoria.ferguson(a alaska.g
ov
From: Kellie Okonek, GPB Production Optimization Team Leader
A flaring event occurred at GCI starting at 11/17/2014 21:00 and stopping at 11/17/2014 23:00 with a volume of 180
(MSCF). The event lasted for 120 minutes, and was due to cool down of K7000 LPS compressor for planned work.
A flaring event occurred at GC1 starting at 11/18/2014 18:24 and stopping at 11/18/2014 23:07 with a volume of 460
(MSCF). The event lasted for 283 minutes, and was due to annex shutdown and associated flaring for depressure.
A flaring event occurred at GC1 starting at 11/19/2014 09:00 and stopping at 11/19/2014 20:30 with a volume of 6580
(MSCF). The event lasted for 690 minutes. The event had a volume greater than 5000 (MSCF), and was due to trip of
GLT compressor due to power load shedding s/d. Flaring stopped when power was restored and the plant restarted.
A flaring event occurred at GC1 starting at 11/20/2014 01:00 and stopping at 11/20/2014 06:30 with a volume of 2920
(MSCF). The event lasted for 330 minutes, and was due to backout of LP/IP compressors from transit system due to
performance issues.
A flaring event occurred at GC1 starting at 11/21/2014 07:00 and stopping at 11/22/2014 with a volume of 6180 (MSCF).
The event lasted for 1020 minutes. The event had a volume greater than 5000 (MSCF), and was due to backout of LP/IP
compressors from transit system due to performance issues.
A flaring event occurred at GC2 starting at 11/17/2014 00:07 and stopping at 11/17/2014 01:30 with a volume of 231
(MSCF). The event lasted for 83 minutes, and was due to ambient -driven fluctuations in transit gas line pressure. Flaring
stopped when production rates were cut.
A flaring event occurred at FS1 starting at 11/19/2014 15:00 and stopping at 11/19/2014 17:45 with a volume of 974
(MSCF). The event lasted for 165 minutes, and was due to STV/IP 1802 compressor shutdown to allow for testing of new
STV/IP compressor 1825.
A flaring event occurred at FS1 starting at 11/21/2014 08:00 and stopping at 11/21/2014 18:50 with a volume of 3611
(MSCF). The event lasted for 650 minutes, and was due to STV/IP 1802 compressor shutdown to allow for testing of new
STV/IP compressor 1825..
A flaring event occurred at FS1 starting at 11/22/2014 10:25 and stopping at 11/22/2014 19:46 with a volume of 6234
(MSCF). The event lasted for 561 minutes. The event had a volume greater than 5000 (MSCF), and was due to SNIP
1802 compressor shutdown to allow for testing of new STV/IP compressor 1825.
Please let me know if you have any questions.
Kellie Okonek
PCC/EOC Production Optimization TL
Office: (907) 659-4472
Cell: (907) 382-1370
akopspcceoctl@bp.com
R" C=aVED
STATE OF ALASKA AN 16 2015
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000032
2. Facility Name
PBU GC 2
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
December -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume,
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 92.28%
AURORA 640120 2.40%
8. Flared or vented 1 hour or less
101
BOREALIS 640130 4.13%
ORION 640135 0.62%
9. Flared or vented more than 1 hour (see instr.)
1,088
POLARIS 640160 0.57%
10. Pilot and Purge
26,145
11. Assist Gas
0
12. Fuel gas used in lease operations.
649,399
Other (see instructions)
0
Official Use Only13.
Authorization >1 hr:
Safety
/ O qG
/ !!�, GG
MCF
14. TOTAL VOLUME (ITEMS 6-12)
676,733
Lease Use
MCF
15, NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
Z —147 /S—
18. Transferred to: (Express as a negative #) CGF
-20,952,933
Commissioner Date
19. Remarks:
I hereby certify that the foregoipg is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature li Title Manager Production Taxes and Roygities Alaska to pressure of 14.65 psia and to a
% /� temperature of 60o F. Authority 20
Printed Name Diane Colla ( Phone 907) 564-5775 Date AAC25.235.
VTI—
Z/�/r5
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -2
GAS FLARING INCIDENT REPORT
December 2014
Events less than or equal to 1
JAN 1 6 2015
Not required for unplanned events <=1 hr Not required for unplanned events <= i hr
TOTAL 0
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
12/5/2014 1432-1726 1,088 See Attachments See Attachments
TOTAL 1,088
Page 7
DATE
12/15/2014
TIME
1031-1100
TOTAL
VOLUME DESCRIPTION OF INCIDENT & CAUSE
101 See Attachments
101
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
See Attachments
TOTAL
0
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events> 1 Hour
1,088
Planned Events < 1 hour and not
101
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
26,145
Assist
0
TOTAL FLARED VOLUME
27,334
1/14/2015
10:49 AM
Flare Start Date 12/012014 V
+. q ice. to I...
Flare End Date 12/31/2014
GC2 Flare Report ?r
Total Volume (MSCF)
1189
Report
Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By
Volume
14-502 Flare Relief 12/05/2014 2:32:00 pm 5:26:00 pm 174 min Yes No No BP1\GILLSJ
1088
Determination Cause IP compressor shut down because ofa problem associated with Startup of production from plant shutdown.
Action Taken Flaring was permitted to continue while GC operations personnel attempted to restart the equipment.
Daily Volume (MSCF)
1088
14-513 Flare Relief 12/15/2014 10:31:00 am 11:00:00 am 29 min No No Yes BP1\PAOLINJM
101
Determination Cause Depressure 0-03 in prep for safe out. Field crew maintenance -dead leg removal.
Action Taken Flowline depressured and test bank returned to service.
Daily Volume (MSCF)
101
Total Volume (MSCF) 1189
Generated 01/08/2015 9:27:01AM Page 7 of 8
Hunt, Jennifer L (DOA)
From:
AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent:
Wednesday, December 10, 2014 6:20 PM
To:
Hunt, Jennifer L (DOA)
Cc:
Loepp, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, HSSEE Env Adv West; Hauger, Wayne A; AK, OPS GCI OSM; AK,
OPS GQ Facility OTL; AK, OPS GC2 OSM; AK, OPS GC2 Facility OTL, AK, OPS GC3&PCC
OSM; AK, OPS GC3 Facility & Field OTL
Subject:
Flaring Events at GC1,�and GC3
Categories: Attention
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson,
AOGCC
iennifer.hunt(o)alaska.gov dave.robvaalaska.gov victoria.ferguson(rDalask
a.gov
From: Wendy Hiester. Production Optimization Team Leader
A flaring event occurred at GC3 starting at 12/08/2014 05:32 and stopping at 12/08/2014 12:10 with a volume
of 1023 (MSCF). The event lasted for 398 minutes and occurred when the Wet Gas compressor shutdown
because of control/instrumentation failure associated with a faulty instrumentation. Flaring was permitted to
continue while GC operations personnel attempted to restart the equipment. Flaring stopped when the
compressor was restarted successfully.
A flaring event occurred at GC2 starting at 12/05/2014 14:32 and stopping at 12/05/2014 17:26 with a volume
of 1088 (MSCF). The event lasted for 174 minutes and occurred when the IP compressor was shut down
because of a problem associated with re -start of production following plant shutdown. Flaring was permitted to
continue while GC operations personnel attempted to restart the equipment. Flaring stopped when the
compressor was restarted successfully.
A flaring event occurred at GCI starting at 12/05/2014 14:30 and stopping at 12/05/2014 23:00 with a volume
of 5050 (MSCF). The event lasted for 510 minutes. The event had a volume greater than 5000 (MSCF) and
occurred when GC2 shut down causing the LPAP compressors to lose flow. Flaring stopped when GC2 started
flowing oil to GC 1 and gas rate increased so that forward flow was reestablished in the LP/IP machines.
Please let me know if you have any questions,
Wendy Hiester (alt. Kellie Okonek)
PMEOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 227-7144 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akor)spcceoctl@bo.com