Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPBU GC 3 Gas DispositionState of Alaska AOGCC Gas Disposition Files Year: 2014 Facility: PBU GC 3 Operator: BP EXPLORATION (ALASKA) R—UV 1 J" v STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000033 2. Facility Name PBU GC 3 3. Field PBU - WOA 4. Operator BP 5. MonthlYear of Disposition January -2014 Disposition Volume MCF 20. Forproduction /turn multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 45 9.. Flared or vented more than 1 hour (see instr.) 3,261 10. Pilot and Purge 15,124 11. Assist Gas 0 12. Fuel gas used in lease operations. 536,432 13. Other (see instructions) 0 Official Use Only Authorization >t hr. Safe b � 2 � / MCF 14. TOTAL VOLUME (ITEMS 6.12) 554,862 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 —q Commissioner Date 16. Transferred to: (Express as a negative#) CGF -24,227,544 19. Remarks: Revised to include > 1 hour flaring events reported to AOGCC in e-mail on 2-24-14 by Travis Rybicki (BP PCC-EOC TL) I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature1 Title Manager Production Taxes and Royalties Alaska Printed Name Diane Coll e Phone (907) 5645775 Date �' 2-� Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235. v�r- 6i3/i f Form 10422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -3 GAS FLARING INCIDENT REPORT January 2014 REVISED 02-24-2014 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT& CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr TOTAL 0 Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT &CAUSE ACTION TAKEN TO ELIMINATE CAUSE 1/20-31/2014 0248-2400 3,261 See Attachments See Attachments TOTAL 3,261 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT&CAUSE ACTION TAKENTO ELIMINATE CAUSE 1/21/2014 0630-0715 45 See Attachments See Attachments TOTAL 45 TIME TOTAL Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME 0 TOTAL a 3,261 45 0 15,124 0 18,430 DESCRIPTION OF IN, See Attachments ACTION TAKEN TO E See Attachments Page 1 2/25/2014 3:15 PM Flare Start Dale 01101/2014 Flare End Date 01/31/2014 GO Flare Report Total Volume (MSCF) 3306 Report Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 14-22 Flare RelieF 01/20/2014 2:48:00 am 12:00:00 am 1272 min Yes No No BPI\dOHNSOM 1281 Determination Cause Production bank shutdown and de -pressured to keep pressure Im due to minor leak WOA stopped bringing production rates into bank and lowered flare valve setpoint to keep pressure low in vessel V-301 a_ W81 continue until Action Taken - - 2.6.14 when repairscanbecotnpleled: -- 14-9 Flare Relief 01/21/2014 12:00:00 am 12:00:00 am 1440 min Yes No No BP1\JOHNSOM 180 Determination Cause Production bank shutdown and de -pressured to keep pressure low due to minor leak Action Taken WDA stopped bringing production rates into bank and lowered flare valve setpoint to keep pressure low in vessel V-301 a 144 Flare Relief 01/21/2014 6:30:00 am 7:15:00 am 45 min No No Yes BPI\HAWKJS 45 Determination Cause Depressure the A HP Seperelor for a leak check on the divert valves on the "A' Header. Action Taken Depressured Separator to 0 psi and closed the flare valve. _ 14-23 Flare Relief 01/22/2014 12:00:00 am 12:00:00 am 1440 min Yes No No BPIUGHNSOM 180 Determination Cause Production bank shutdown and de -pressured to keep pressure lowdue to minor leak WOA stopped bringing production rates into bank and lowered flare valve setpoint to keep pressure low In vessel V -301a Action Taken 14-24 Flare Relief 01/23/2014 12:00:00 am 12:00:00 am 1440 min Yes No No BPIUGHNSOM 180 Determination Cause Production bank shutdown and de -pressured to keep pressure low due to minor leak Action Taken WOA stopped barging production rates into bank and lowered flare valve setpoint to keep pressure low in vessel V-3019 14-25 Flare Relief 01/2412014 12:00:00 am 12:00:00 am 1440 min Yes No No BPIUGHNSOM 180 Determination Cause Production bank shutdown and de -pressured to keep pressure low due to minor leak Action Taken WOA stopped bringing production rates into bank and lowered flare valve setpoint to keep pressure low in vessel V -301a 14-26 Flare Relief 01/25/2014 12:00:00 am 12:00:00 am 1440 min Yes No No BPIUGHNSOM 180 Determination Cause Production bank shutdown and de -pressured to keep pressure low due to minor leak Action Taken WOA stopped bringing production rates Into bank and lowered flare valve setpoint to keep pressure low in vessel V -301a 14-27 Flare Relief 01/26/2014 12:00:00 am 12:00:00 am 1440 min Yes No No BPIUGHNSOM 180 Determination Cause Production bank shutdown and de -pressured to keep pressure low due to minor leak Action Taken WOA stopped bunging production rates into bank and kwrered flare valve setpoint to keep pressure low In vessel V-301 a 14-26 Flare Relief 01/2712014 12:00:00 am 12:00:00 am 1440 min Yes No No BPIUGHNSOM 180 Determination Cause Production bank shutdown and de -pressured to keep pressure low due to minor leak Action Taken WOA stopped bringing production rates info bank and lowered flare valve setpoint to keep pressure low in vessel V -301a 14-29 Flare Relief 01/28/2014 12:00:003M 12:00:OOant 1440MIn Yes No No BPIUGHNSOM 180 Determination Cause Production bank shutdown and de -pressured to keep Preesure low due to minor leak Action Taken WOA stopped bringing production rates into bank and lowered flare valve setpoint to keep pressure low in vessel V -301a 14-30 Flare Relief 01/2912014 12:00:00 am 12:00:00 am 1440 min Yes No No BP1UGHNSOM 180 Generated 02/24/2014 4:53:31 PM Page 1 of Flare StartDate 01 /0112 01 4 Flare End Date 01 /3112 01 4 Determination Cause Production bank shutdown and de -pressured to keep pressure low due to minor leak Action Taken WOA stopped banging produc0on rates into bank and lowered flare valve setpoint to keep pressure low in vessel V -301a _. 14.31 Flare Relief 01/30/2014 12:00:OOam 12:00:00am 1440min Yes No No BPIUGHNSOM 180 Determination Cause Production bank shutdown and de -pressured to keep pressure low due to minor leak Action Taken WOA stopped banging production miss into bank and lowered flarevalve setpoini to keep pressure low In vessel V -301e 14-32 Flare Relief 01/31/2014 12:00:00 am 12:00:00 am 1440 min Yes No No BPIUGHNSOM 180 Determination Cause Production bank shutdown and de -pressured to keep pressure low due to minor leak Action Taken WOA stopped bringing production rates into bank and lowered flare valve setpoint to keep pressure low in vessel V-301 a Total Volume (MSCF) 3306 Page 2 of 2 Generated 02/24/2014 4:53:31 PM unt, Jennifer L ovA com] AK, OPS PCC EO 24 ZIgA40P41 PMEOCTL@bp. rom: Monday, February ,nson, Gary A; ent: Hunt, Jennifer L (DOA) o: Ferguson, victona L (DOA); Roby, David SS (DOA); Facility);t& Field 1eOT Alejandra; OPS GC3&PCC %c:Arthur, Gregory; Kruger, Dale O; OSM; AK, HSSEE Env Adv West Gas flaring events a tISM Subject: CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC To: Jennifer Hunt, AOGCC dave rob &alaskaoo_v victoria ferausonAalaska.gov ennifer huntC�alaska.00v From: Travis Rybicki, GPB Production Optimization Team Leader on further review of the facility engineer. The below events have been corrected in our internal flare database upon m at 01/21/2014 with a volume of 1281 at 01/20/2014 02:48 and stopping production bank to keep A flaring event occurred at GC3 starting but valve leakage caused (MSCF). The event lasted for 1272 minutes roducuo was � as reduced t minimize flaring, pressure off of a minor leak. Incoming p laced back in service. daily flaring until the leak could be repaired and the bad p rn at 01/22/2014 with a volume of 180 Flaring continued at GC3 starting at 01/21/2014 00:00 and stopping (MSCF). The event lasted for 1440 minutes. in at 01/23/2014 with a volume of 180 Flaring continued at GC3 starting at 01/22/2014 00:00 and stopping (MSCF). The event lasted for 1440 minutes* at 01/24/2014 with a volume of 180 Flaring continued at GC3 starting at 01/23/2014 00:00 and stopping (MSCF). The event lasted for 1440 minutes. at 01/25/2014 with a volume of 180 Flaring continued at GC3 starting at 01/24/2014 00:00 and stopping (MSCF). The event lasted for 1440 minutes. in at 01/26/2014 with a volume of 180 Flaring continued at GC3 starting at 01/25/2014 00:00 and stopping (MSCF). The event lasted for 1440 minutes. in at 01 /27/2014 with a volume of 180 Flaring continued at GC3 starting at 01/26/2014 00:00 and stopping (MSCF). The event lasted for 1440 minutes. in at 01/29/2014 with a volume of 180 Flaring continued at GC3 starting at 01 /27/2014 00:00 and stopping (MSCF). The event lasted for 1440 minutes. in at O1 /29/2014 with a volume of 180 Flaring continued at GC3 starting at 01/28/2014 00:00 and stopping (MSCF). The event lasted for 1440 minutes. Flaring continued at GC3 starting at 01/29/2014 00:00 and stopping at 01/30/2014 with a volume of 180 - (MSCF). The event lasted for 1440 minutes. 1 Flaring continued at GO starting at 01/30/2014 00:00 and stopping at 01/31/2014 with a volume of 180 (MSCF). The event lasted for 1440 minutes. Flaring continued at GO starting at 01/31/2014 00:00 and stopping at 02/01/2014 with a volume of 180 (MSCF). The event lasted for 1440 minutes. Flaring continued at GC3 starting at 02/01/2014 00:00 and stopping at 02/02/2014 with a volume of 180 (MSCF). The event lasted for 1440 minutes. Flaring continued at GO starting at 02/02/2014 00:00 and stopping at 02/03/2014 with a volume of 180 (MSCF). The event lasted for 1440 minutes. Flaring continued at GO starting at 02/03/2014 00:00 and stopping at 02/04/2014 with a volume of 180 (MSCF). The event lasted for 1440 minutes. Flaring continued at GO starting at 02/04/2014 00:00 and stopping at 02/05/2014 with a volume of 180 (MSCF). The event lasted for 1440 minutes. Flaring continued at GO starting at 02/05/2014 00:00 and stopping at 02/05/2014 11:24 with a volume of 90 (MSCF). The event lasted for 684 minutes. Flaring stopped when the leak was repaired and the bank placed back in service. Please let me know if you have any questions. Travis M. Rybicki PCC.EOC (Production Optimization) Team lead Office 907-659-4472 (BOC) 659-5566 (PBOC) Cell 907-748-2118 Harmony 758-4404 GPB Pager 907-659-5272 # 1890 a kopspcceoctlna. bp. com Alternate: Kellie Okonek STATE OF ALASKA Ary.�_till�_��I�Ze7�YK�I�FY_���ltii[iP�[�Zi tI�I�IF�9[�I�I FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000033 2, Facility Name PBU GC 3 3. Field PBU - WOA 4. Operator IBP 5. MonthNear of Disposition February -2014 Disposition Volume MICE 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 810 10. Pilot and Purge 13,986 11. Assist Gas 0 12. Fuel gas used in lease operations. 485,586 13. Other (see instructions) Q Official Use Only Authorization>1 hr: Safety � � G� MCF 14. TOTAL VOLUME (ITEMS 6-12) 500,382 Lease Use MCF 15. NGL Gas Equivalent Q Conservation MCF 16. Purchased gas Q Waste: MCF 17. Transferred from: 0 /� Commissioner l0 iDate 18. Transferred to: (Express as a negative #) CGF -22,245,329 19. Remarks: I hereby certify that a foregoing is true and correct to the best of my knowledge. ��� j1 �� Note: All volumes must be corrected Signature �(� Title Mana er Production Taxes qnd RZpyalties Alaska to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Dat / 4_/ AAC25.235. VLF 1,1314 Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate TOTAL i BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -3 GAS FLARING INCIDENT REPORT February 2014 Not required for unplanned events <=1 hr Not required for unplanned events <= 1 hr 2/1-5/2014 0000-1124 810 See Attachments See Attachments TOTAL 810 DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO E See Attachments See Attachments TOTAL 0 Planned Events Exceeding 1 Hour OR > 5.000 mcf TOTAL Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME 0 TOTAL 0 810 0 0 13,986 0 14,796 See Attachments See Attachments CAUSE Page 9 3/12/2014 4:56 PM Flare Start Date 02/01/2014 Flare End Date 02/28/2014 Report Numbs System Date GC3 Flare Report Total Volume (MSCF) 810 Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 14-33 Flare Relief 02/01/2014 12:00:00 am 12:00:00 am 1440 min Yes No No uriuvnrva�i Determination Cause Production bank shutdown and de -pressured to keep pressure low due to minor leak Action Taken WOA stopped bringing production rates into bank and lowered Bare valve setpoint to keep pressure low in vessel V_301a_ 14-34 Flare Relief 02/02/2014 12:00:00 am 12:00:00 am 1440 min Yes No No BPIWOHNSOM Determination Cause Production bank shutdown and de -pressured to keep pressure low due to minor leak Action Taken WOA stopped bringing production rates into bank and lowered Flare valve setpoint to keep pressure low in vessel V-301 a 180 14-35 Flare Relief 02/03/2014 12:00:00 am 12:00:00 am 1440 min Yes No No BPIWOHNSOM 180 Determination Cause Production bank shutdown and de -pressured to keep pressure low due to minor leak Action Taken WOA stopped bringing production rates into bank and lowered flare valve setpoint to keep pressure low in vessel V -301a 14-36 Flare Relief 02/04/2014 12:00:00 am 12:00:00 am 1440 min Yes No No BPIUGHNSOM 180 Determination Cause Production bank shutdown and de -pressured to keep pressure low due to minor leak Action Taken WOA stopped bringing production rates into bank and lowered flare valve setpoint to keep pressure low in vessel V -301a 14-37 Flare Relief 02/05/2014 12:00:00 am 11:24:00 am 684 min Yes No No BPIWOHNSOM 90 Determination Cause Production bank shutdown and de -pressured to keep pressure low due to minor leak Action Taken WOA stopped bringing production rates into bank and lowered flare valve setpoint to keep pressure low in vessel V -301a Total Volume (MSCF) 810 Generated 03/04/2014 2:15:08PM Page 9 or a rom: ent: 'o: ;c: Subject: L DOA AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comi Monday, February 24, 2014 3:41 PM Gary A; Hunt, Jennifer L (DOA) Roby, David S (DOA); Castano, Alejandra; BOPS GC3&PCC on Ferguson, victoria L (DOA); Arthur, Gregory; Kruger, Dale O; AK, OPS GC3 Facility &Field OTL; A OSM; AK, HSSEE Env Gas v West flaring evens at GC3 AOGCC CC: Dave Roby, AOGCC To: Jennifer Hunt, dave robyC�alaska aov enniferhuntgalaska.gov CC: Victoria Ferguson, AOGCC victoria fergusonC�alaska aov From: Travis Rybicki, GPB Production Optimization Team Leader engineer. eview of the The below events have been corrected in our internal flare database upon further at Ol/21/2014cwith avolume of 1281 production bank to keep A flaring event occurred at GC3 starting at 01/20/2014 02o and stopping but valve leakage caused (MSCF). The event lasted for 1272 minuesand away reducedrtosmiin minimize Hazing, pressure off of a minor leak. Incoming production laced back in service. daily flaring until the leak could be repaired and the bank placed Flaring continued at GC3 starting at 01/21/2014 00:00 and stopping at 01/22/2014 with a volume of 180 (MSCF). The event lasted for 1440 minutes. Flaring continued at GC3 starting at 01/22/2014 00:00 and stopping at 01/23/2014 with a volume of 180 (MSCF). The event lasted for 1440 minutes. in at 01 /24/2014 with a volume of 180 Flaring continued The event la t d for starting at 01/23/2014 00:00 and stopping (MSCF). at 01/25/2014 with a volume of 180 Flaring continued at GC3 starting at 01/24/2014 00:00 and stopping (MSCF). The event lasted for 1440 minutes. Flaring continued at GC3 starting at 01/25/2014 00:00 and stopping at 01/26/2014 with a volume of 180 (MSCF). The event lasted for 1440 minutes. Flaring continued at GC3 starting at 01/26/2014 00:00 and stopping at 01/27/2014 with a volume of 180 (MSCF). The event lasted for 1440 minutes. Flaring continued at GC3 starting at 01/27/2014 00:00 and stopping at 01/28/2014 with a volume of 180 (MSCF). The event lasted for 1440 minutes. Flaring continued at GC3 starting at 01/28/2014 00:00 and stopping at 01/29/2014 with a volume of 180 (MSCF). The event lasted for 1440 minutes. Flaring continued at GC3 starting at 01/29/2014 00:00 and stopping at 01/30/2014 with a volume of 180 (MSCF). The event lasted for 1440 minutes. 1 Flaring continued at GO starting at 01/30/2014 00:00 and stopping at 01/31/2014 with a volume of 180 (MSCF). The event lasted for 1440 minutes. Flaring continued at GO starting at 01/31/2014 00:00 and stopping at 02/01/2014 with a volume of 180 (MSCF). The event lasted for 1440 minutes. Flaring continued at GO starting at 02/01/2014 00:00 and stopping at 02/02/2014 with a volume of 180 (MSCF). The event lasted for 1440 minutes. Flaring continued at GO starting at 02/02/2014 00:00 and stopping at 02/03/2014 with a volume of 180 (MSCF). The event lasted for 1440 minutes. Flaring continued at GO starting at 02/03/2014 00:00 and stopping at 02/04/2014 with a volume of 180 (MSCF). The event lasted for 1440 minutes. Flaring continued at GC3 starting at 02/04/2014 00:00 and stopping at 02/05/2014 with a volume of 180 (MSCF). The event lasted for 1440 minutes. Flaring continued at GO starting at 02/05/2014 00:00 and stopping at 02/05/2014 11:24 with a volume of 90 (MSCF). The event lasted for 684 minutes. Flaring stopped when the leak was repaired and the bank placed back in service. Please let me know if you have any questions. Travis M. Rybicki PCC-EOC (Production Optimization) Team Lead office 907-659-4472 (BOC) 659-5566 (PBOC) Cell 907-748-2118 Harmony 758-4404 GPB Pager 907-659-5272 # 1890 akoPspcceoctI(CDbq. com Alternate: Kellie Okonek STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000033 2. Facility Name PBU GC 3 3. Field PBU - WOA 4. Operator BP 5. MonlhNear of Disposition March -2014 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold U Pool Name Pool Code Percent 7. Reinjected D 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 12,884 11. Assist Gas 0 12. Fuel gas used in lease operations. 531,824 13. Other (see instructions) U Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 544,708 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: 0 Commissioner Date 18. Transferred to: (Express as a negative #) CGF -25,869,578 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature(!// KqM� Title Manager Production Taxes and Royalties Alaska Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Diane Colley Phone (907) 564-5775 Date �11111 Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000033 2. Facility Name PBU GC 3 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition April -2014 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 2,015 9. Flared or vented more than 1 hour (see instr.) 1,399 10. Pilot and Purge 12,649 11. Assist Gas 0 12. Fuel gas used in lease operations. 481,975 13. Other (see instructions) 0 Official Use Only Authorization >t hr Safety2 G ✓ ! MCF 14. TOTAL VOLUME (ITEMS 6-12) 498,038 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 Commissioner Date 18. Transferred to: (Express as a negative #) CGF -21,611,550 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature '^'r ^ Title Mans er Production Taxes and Ro alties Alaska Printed Name Diane ColleyPhone (907) 564-5775 Date �/� / Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 AAC25.235. VL i= ,-`24 (1¢ Form 10-422 Rev. W009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALA5KA) Irv. PRUDHOE BAY UNIT - GC -3 GAS FLARING INCIDENT REPORT April 2014 ACTION TAKtry I V cU' ,-'-. - -• --- nplanned Events less than or equal t0 VOLUME DESCRIPTION Of INCIDENT &CAUSE Not required for unplanned events <=1 hr DATE TIME 4/5/2014 1615-1640 1,910 Not required for unplanned events <= 1 hr 4/11/2014 0313-0322 105�— TOTAL 2,015 4/6/2014 TOTAL han or See Attachments 0 VOLUME DESCRIPTION OF IN( See Attachments TOTAL 'ding 1 Hour OR TIME 0033-0457 TOTAL Unplanned Events < 1 Hour Unplanned Events > 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME > 5,000 mcf VOLUME DESCRIPTION OF INI 1,399 See Attachments 1 399 TOTAL 2,015 0 0 1,399 12,649 0 16,063 See Attachments See Attachments ACTION TAKEN TO t See Attachments Page 8 5/15/2014 10'.51 AM Flare Start Date 04101/2014 Flare End Date 04/30/2014 Report Numbe System GC3 Flare Report Total Volume (MSCF) 3414 Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 14-111 Flare Relief 04/06/2014 12.33:00 am 4:57:00 am 264 min No Determination Cause LPS Compressor K-7001 shutdown for upcoming water wash. Action Taken Completed spin cool. Generated 05/05/2014 10:32:25AM No Yes BPI\BLUEKES 1399 Total Volume (MSCF) 3414 Page 9 of 9 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000033 2. Facility Name PBU GC 3 3. Fieltl PBU - WOA 4. Operator BP 5. MonthNear of Disposition Ma -2014 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 30 10. Pilot and Purge 16,276 11. Assist Gas 0 12. Fuel gas used in lease operations. 508,232 13. Other (see instructions) 0 Official Use Only Authorization>1 hr: Safety �C7 MCF 14. TOTAL VOLUME (ITEMS 6-12) 524,538 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 Commissioner Date 18. Transferred to: (Express as a negative #) CGF -22,250,361 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature Title Manager Production Taxes and Ro alties Alaska Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Diane Colley Phone (907) 564-5775 Date VL -F to/ZG//y Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT -GC -3 GAS FLARING INCIDENT REPORT May 2014 Events less than or equal to 1 DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr TOTAL 0 DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 5/12/2014 1010-1130 30 See Attachments See Attachments TOTAL 30 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events > 1 Hour 30 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events> 1 hour or 0 exceeding 5,000 MCF Pilot Purge 16,276 Assist 0 TOTAL FLARED VOLUME 16,306 Page 9 6/12/2014 10:40 AM Flare Start Date 05/01/2014 Flare End Date 05/31/2014 GC3 Flare Report Total Volume (MSCF) 30 Report Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 14-161 Flare Relief 05/12/2014 10:1000 am 11:30:00 am 80 min Yes Determination Cause Plant upset due to flare valve oft seat on test separator. Action Taken Reseated valve. No No BP1\MOORDV 30 Total Volume (MSCF) 30 Generated 06/03/2014 9:13:32AM Page 10 of 10 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000033 2. Facility Name PBU GC 3 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition I June -2014 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected U 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 15,163 11. Assist Gas 0 12. Fuel gas used in lease operations. 317,574 13. Other (see instructions) 0 Oficial Use OnlyMCF Authorization >t hr: Safety 14. TOTAL VOLUME (ITEMS 6-12) 332,737 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 Commissioner Date 18. Transferred to: (Express as a negative #) CGF -14,837,373 19. Remarks: I hereby certify that theforegoingis true and correct to the best of my knowledge. l/art, / y'ly% Note: All volumes must be corrected Signature aG4GVf l,L�� Title Maria er Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a 71 temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date y' AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000033 2. Facility Name PBU GC 3 3. Field PBU - WOA 4. Operator BP 5. MonthlYear of Disposition July -2014 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 28,472 ✓ 9. Flared or vented more than 1 hour (see instr.) 1,282 10. Pilot and Purge 14,584 11. Assist Gas 0 12. Fuel gas used in lease operations. 452,587 13. Other (see instructions) 0 Official Use Only Authorization >1 hr. Safety / p Z p MCF 14. TOTAL VOLUME (ITEMS 6-12) 496,925 Lease Use MCF 15, NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 n U y c4 Commissioner Date 18. Transferred to: (Express as a negative #) CGF -20,053,362 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Q(�)�/���n Note: All volumes must be corrected Signature VsCS.��f tl. Title Maria er Production Taxes and Ro. allies Alaska to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date / AAC25.235. y z- dr ,F/ItIJq Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT -GC -3 GAS FLARING INCIDENT REPORT July 2014 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 7/24/2014 1624-1644 28,472 Not required for unplanned events <=1 hr Not required for unplanned events <= 1 hr TOTAL 28,472 7/19/2014 7/20/2014 DATE DATE 1448-1735 0815-1030 TOTAL IILLtq TOTAL TOTAL Unplanned Events < 1 Hour Unplanned Events > 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME 1,160 See Attachments 122 1,282 VOLUME See Attachments 0 TOTAL 28,472 1,282 0 0 14,584 0 44,338 See Attachments ACTION TAKEN TO ELIMINATE See Attachments See Attachments See Attachments Page 9 8/14/2014 2:23 PM Flare StartDate 07/01/2014 Flare End Date 07/31/2014 GC3 Flare Report Total Volume (MSCF) 29754 Report Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 14-258 Flare Relief 07/19/2014 2:48:00 pm 5:35:00 pm 167 min No No No BPIWOHNSOM 1160 Determination Cause Wet Gas compressor shutdown because of control/instrumentation failure associated with a fault Action Taken WOA reduced production rates and choked 3 wells equaling 10,000 bwpd. Wells were shut-in or choked back starting at 1&.58 hours__ 14-259 Flare Relief 07/20/2014 8:15:00 am 10:30:00 am 135 min Yes No No BPIUGHNSOM 122 Determination Cause High gas transit line pressure caused by CGF compressor work Action Taken No response taken as this was deemed to be of short duration. Total Volume (MSCF) 29754 Generated 08/04/2014 11:24:17AM Page 11 of"! Hunt, Jennifer L (DOA From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent: Sunday, July 20, 2014 12:30 PM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; Kruger, Dale O; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM; AK, OPS GC2 OSM; AK, OPS GC2 Facility OTL; AK, OPS GC3 Facility & Field OTL; AK, OPS GC3&PCC OSM Subject: Gas flaring events at GC1, GC2, %03 To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC 0ennifer.hunt(o)alaska.gov dave.roby(o)alaska.gov victoria.fergusonna.alaska.gov From: Kellie Okonek, GPB Production Optimization Team Leader GC1 A flaring event occurred at GC1 starting at 06/17/2014 03:00 and stopping at 06/18/2014 with a volume of 1090 (MSCF). The event lasted for 1260 minutes, and was due to LP compressor instability due to temperature swings. Flaring stopped when necessary process changes were made. A flaring event occurred at GC1 starting at 06/20/2014 05:08 and stopping at 06/21/2014 with a volume of 2616 (MSCF). The event lasted for 1132 minutes, and was due to low oil throughput causing insufficient LP/IP gas. A flaring event occurred at GC1 starting at 06/21/2014 00:00 and stopping at 06/21/2014 05:25 with a volume of 2408 (MSCF). The event lasted for 325 minutes, and was due to low oil throughput causing insufficient LP/IP gas. A flaring event occurred at GC1 starting at 06/23/2014 14:10 and stopping at 06/23/2014 15:45 with a volume of 1200 (MSCF). The event lasted for 95 minutes, and was due to a blown UPS fuse causing an LPS compressor shutdown. Flaring stopped when the compressor was re -loaded. A flaring event occurred at GC1 starting at 06/25/2014 08:45 and stopping at 06/25/2014 10:00 with a volume of 1437 (MSCF). The event lasted for 75 minutes, and was due to an unplanned shutdown of A/B banks to the GC1 annex. Flaring stopped when the banks were put back in service. A flaring event occurred at GC1 starting at 07/02/2014 00:01 and stopping at 07/03/2014 with a volume of 3400 (MSCF). The event lasted for 1439 minutes, and was due to a UPS power failure to the skid 7 control room. Flaring stopped when UPS was fixed and power restored. A flaring event occurred at GC1 starting at 07/03/2014 00:01 and stopping at 07/03/2014 06:30 with a volume of 1600 (MSCF). The event lasted for 389 minutes, and was due to a UPS power failure to the skid 7 control room. Flaring stopped when UPS was fixed and power restored. A flaring event occurred at GC1 starting at 07/04/2014 06:00 and stopping at 07/04/2014 12:00 with a volume of 280 (MSCF). The event lasted for 360 minutes, and was due to 2^° stage D -bank backpressure controller issues. Flaring stopped when the backpressure controller was re -adjusted. A flaring event occurred at GC1 starting at 07/08/2014 04:00 and stopping at 07/08/2014 22:30 with a vofume of 940 (MSCF). The event lasted for 1110 minutes, and was due to loss of forward flow on IP compressors. Flaring stopped when temperature/pressure adjustments made to re-establish flow. A flaring event occurred at GC1 starting at 07/17/2014 18:00 and stopping at 07/18/2014 with a volume of 8170 (MSCF). The event lasted for 360 minutes. The event had a volume greater than 5000 (MSCF), and was due to depressurization of Y/P pads for safe -out. Flaring stopped when depressurization was complete. 4 flaring event occurred at GCI starting at 07118/2014 04:00 and stopping at 07/19/2014 with a volume of 6886 (MSCF). The event lasted for 1200 minutes. The event had a volume greater than 5000 (MSCF), and was due to shutdown and depressure of GHX tie -line between GC1 &2 for GC2 planned turnaround. GC2 at 606 A flaring event The eent occurredlastatfoC 09 minutes, 0and3wasldue to hi h gas transit pressure cau ed by an14 09:16 tincrease n aa volume mbient (MSCF). temperatures and EOA 1806 compressor shutdown. A flaring event occurred at GC2 starting at 07/1212014 21:15 and stopping at 0711 00 (M CF), and was due to high with a volume of 7812 (MSCF). The event The event had volume greater than ambient t mpe atur ssted causing t anfor 75lsiit gas system ssues.aFlar ng stopped when5rateswere cut on the EOA. GC3 in at 07119/2014 17:35 with a volume of 1160 compressor shutdown due to control/instrumentation Aflaring event occurred at GC3 starting at 0711912014 14:48 and stopping (MSCF). The event lasted for 167 minutes, and was due to wet gas comp failure associated with a fault. Production was reduced to minimize flaring. Please let me know if you have any questions. Kellie Okonek (alt. Travis Rybicki) PCCIEOC Production Optimization TL external: 07) 82 1370 Harmony: 758 59 4472 (soC) 15 4 PBOC) 04 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akopsgcceoctI ba com Hunt, Jennifer L DOA From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj Sent: Tuesday, July 22, 2014 8:14 AM To: Hunt, Jennifer L (DOA) Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary OPS FS1 rOSM; AK, OPS FS2 Facility OTL; AK, OPS v East; Burgess, DFS2 OSM; AK,, HSSEE Env OPS FSI l'AdvOWest; PCC OSM; AK, OPS GC3 Facility & Field OTL; Kruger, Dale Hiester, Wendy; AK, OPS GC3& O; AK, OPS PCC EOC TL Subject: Gas flaring events at FS1, FS2 Categories: Work CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC To: Jennifer Hunt, AOGCC a�„e Dave Roby, AOGCC Victoria.ferausonCo�alaska.aov_ nnifPr huntColalaska 4ov From: Kellie Okonek, GPB Production Optimization Team Leader F51: at 07120/2014 16:15 with a volume of 1474 A flaring event occurred at FSI starting at 07120/2014 14:25 and stopping (MSCF). The event lasted for 110 minutes, and was due to depressurization of commonlines and vessels in support of planned shutdown to change out F5000ESD valve on the gas transit system. A flaring event occurred at FS1 starting at 07120/2014 10:40 and stopping at 07120/2014 T/C 1 with a volume of 41 (MSCF). The event was a black smoke event, and was due to testing of ESD function of TIC 1803 as it shutdown for the plant shutdown. in at 07120/2014 23:59 with a volume of 25000 A flaring greater than 5000 (MSCF), and was due to the event occurred at FSI starting at 0712012014 16:30 an stopping (MSCF). The event lasted for 449 minutes. The event had a volume g controlled depressurization of the 42” and 60" gas transit lines in support of safe -out for the F5000V ESD valve changeout. at 07121/2014 with a volume of 4000 (MSCF). F52: of vessels and commonlines for planned A flaring event occurred at FS2 starting at 07/2012014 15:15 and stopping The event tdownfoor 525 m utas, and was due to shut-in and depressurization plant s GC3: in at 07/20/2014 10:30 with a volume of 122 pressure as the Prudhoe east facilities A flaring event occurred at GC3 starting at 0712012014 08:15 and stopping (MSCF). The event lasted for 135 minutes, and was due to high htga system line bpzed. ramped down for planned maintenance. Flaring stopped Please let me know if you have any questions. Kellie Okonek (alt. Travis Rybicki) PCCIEOC Production Optimization TL external: 382)1659 4472 (BOC) 15 370 Harmony: 758 4 PBOC) 04 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akoosocce0c1-I&P com iunt, Jennifer L : rom: Sent: To: Cc: Subject: AK, O�EOC TL [AKOPSPCCEOCTL@bp.coml Friday, July 25, 2014 5:31 PM Hunt, Jennifer L (DOA) Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benss son, Gary Arthur, Ern9 Ads K, OAK OPS GC3&PCC AK CPS CPSE Env dGC3 Facility v East; & Field vOTL; AK HSSEE Kruger, Dale O; AK, OPS GC1 OSM; AK, OPS GC1 Facility OTL; AK, OPS FS2 OSM; A , OPS FS2 Facility OTL RE: Gas flaring events at FS1, FS2.100 CC: Dave Roby, AOGCC To: Jennifer Hunt, AOGCC dave ro_ by@a_1aska qov iennifer huntCc_alaska.gov CC: Victoria Ferguson, AOGCC victoria ferausongalaska.9ov From: Kellie Okonek, GPB Production Optimization Team Leader GC1: at 07/2512014 with a volume of 2404 (MSCF)- GCI* flaring event occurred at GC1 starting at 0712 , to to 0 it rate and ringfrom stopping at 0712412014 with a volume of 2946 (MSCF). The event lasted for 1440 minutes, and was due to low oil rate flaring from the LP/IP. A flaring event occurred at GC1 starting at 0712312014 00:00 and stopping The event lasted for 1440 minutes, and was due to low oil rate flaring from the LPIIP. GC3 in at 0712412014 16:44 with a volume of 28472 rester than 4/20 (MSCF), and was due to a power loss in the LPS section. Flaring _GC flaring event occurred at GC3 starting at 0712412014 16:24 and stopping (MSCF). The event had a volume g stopped when rates were reduced. FS2: minutes, and was due to SII and depressure of plant and drillsite lines for residue gas line A flaring event occurred FS2 starting at 0712012014 15:15 and stopping at 07/21/2014 with a volume of 4000 (MS The event lasted for 55 maintenance and in at 0712112014 with a volume of 25000 re of EOA A flaring event occurred at FS2 starting at 0712012014 15:15 h n 5000 (MSCF), and was due to dep The event lasted for 525 minutes. The event had a volume greater residue gas transit system along with FS -1 for planned ESD valve replacement. Please let me know if you have any questions. Kellie Okonek (alt. Travis Rybicki) PCCIEOC Production Optimization TL external: (907) 659 4472 (BOC 75554404PBOC) cell: (907) 382 1370 Harmony: Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100 e-mail akpsocceoctlCr by com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000033 2. Facility Name PBUGC 3 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition August -2014 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 3,855 10. Pilot and Purge 14,030 11. Assist Gas 0 12. Fuel gas used in lease operations. 467,541 13. Other (see instructions) 0 Official use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6.12) 485,426 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 Commissioner Dale 18. Transferred to: (Express as a negative #) CGF -20,035,665 19. Remarks: 1 hereby certify that tp? foregoing is try a d mect to the best of my knowledge. n /'11�n�/l�� oaf Signature dL a li l Ii�CY.�; Title Manager Production Taxes a d Royalties Alaska Printed Name Diane Colley Phone (907) 564-5775 Date 409 Note: All volumes must be corrected to pressure of 14.65 psla and to a temperature of 60o F. Authority 20 AAC25.235. Vr f a! 7-i f 1 Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT -GC -3 GAS FLARING INCIDENT REPORT August 2014 Not required for unplanned events <= 1 hr Not required for unplanned events <=1 hr TOTAL 0 Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 8/7-8/2014 1445-0220 3,855 See Attachments See Attachments TOTAL 3,855 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Planned Events Exceeding 1 Hour OR > 5,000 mcf See Attachments TOTAL 0 See Attachments Page 9 9/15/2014 4:46 PM TOTAL Unplanned Events < 1 Hour 0 Unplanned Events> 1 Hour 3,855 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 14,030 Assist 0 TOTAL FLARED VOLUME 17,885 See Attachments Page 9 9/15/2014 4:46 PM FlareStartDate 08/01/2014 Flare End Date 08/31/2014 GC3 Flare Report Total Volume (MSCF) 3855 Report Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 14-290 Flare Relief 08/07/2014 2:45:00 pm 12:00:00 am 555 min No No No BP1\MOORDV 3083 Determination Cause Wet Gas compressor shutdown because of control/instrumentation failure associated with a faulty electrical relay. Action Taken WOA reduced production rates and shut-in wells. Wells were shut-in or choked back 14-291 Flare Relief 08/08/2014 12:00:00 am 2:20:00 am 140 min No No No BPIWOORDV 772 Determination Cause Wet Gas compressor shutdown because of controlliinstrumentation failure associated with a faulty electrical relay. Action Taken WOA reduced production rates and shut-in wells. Wells were shut-in or choked back Total Volume (MSCF) 3855 Generated 09/09/2014 1:36:11PM Page 10 of 10 Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj Sent: Sunday, August 10, 2014 11:00 AM To: Hunt, Jennifer L (DOA) Cc: Roby, David S (DOA); Ferguson, Victoria L (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; Kruger, Dale O; AK, OPS GC3&PCC OSM; AK, OPS GC3 Facility & Field OTL; AK, OPS GC1 OSM; AK, OPS GC1 Facility OTL Subject: Flaring Events at GC3 and GC1 To: Jennifer Hunt, AOGCC CC'. Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC iennifer huntCc alaska.00v dave robvna.alaska.00v victoria ferousonCa7alaska.00v From: Wendy Hiester, GPB Production Optimization Team Leader GC3: A flaring event occurred at GC3 starting at 08/07/2014 14:45 and stopping at 08/08/2014 02:20 with a volume of 3855 (MSCF). The event lasted for 695 minutes and was due to a Wet Gas compressor shutdown because of control/instrumentation failure associated with a faulty electrical relay. To stop the flaring, wells were shut in or choked back. GC1: A flaring event occurred at GCI starting at 08/04/2014 15:40 and stopping at 08/04/2014 18:05 with a volume of 250 (MSCF). The event lasted for 145 minutes. GC1 Flared off of V-136 IP Gas Scrubber when K-108 IP Compressor lost forward flow. Flaring stopped when K-108 resumed forward flow. A flaring event occurred at GC1 starting at 08/02/2014 15:20 and stopping at 08/02/2014 19:15 with a volume of 370 (MSCF). The event lasted for 235 minutes. GCI Flared while swapping K-105 and K-106 LP compressors. Flaring stopped when K-106 was stabilized. A flaring event occurred at GC 1 starting at 08/01/2014 08:00 and stopping at 08/01/2014 18:00 with a volume of 20 (MSCF). The event lasted for 600 minutes. 8/1 GC1 Flared off of V -120A LP Gas K.O. Drum because of fluctuating LP gas rates. The flaring stopped once gas rate was stabilized. A flaring event occurred at GCI starting at 07/31/2014 00:01 and stopping at 07/31/2014 23:59 with a volume of 370 (MSCF). The event lasted for 1438 minutes. 7/31 GC1 Flaring off of V-136 because K-107 IP Compressor loss forward flow. Flaring was stopped once forward flow was re-established through K-107. Please let me know if you have any questions. Wendy Hiester (alt. Kellie Okonek) PCC/EOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 227-7144 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akor)spcceoctl@bp.com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000033 2. Facility Name PBU GC 3 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition September -2014 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 14,073 11. Assist Gas 0 12. Fuel gas used in lease operations. 433,684 13. Other (see instructions) 0 Official Use Only Authorization >t hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 447,757 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 Commissioner Dale 18. Transferred to: (Express as a negative #) CGF -24,619,466 19. Remarks: I hereby certify that the oregoing is true and correct to the best of my knowledge. /J/�/) Signature !/t' r l,c Title Manager Production Taxes and Royalties Alaska Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Diane Colley/ Phone (907) 564-5775 Date � 94 Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate Hunt, Jennifer L (DOA From: AK, OPS PCC EOC TL ]AKOPSPCCEOCTL@bp.com] Sent: Sunday, October 19, 2014 8:59 AM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; Kruger, Dale O; Hauger, Wayne A; Burgess, David H; AK, HSSEE Env Adv East; Loader, Neil; AK, OPS FS3 Facility OTL; AK, OPS FS3 OSM; AK, OPS GC3 Facility & Field OTL; AK, OPS GC3&PCC OSM; AK, OPS PCC EOC TL Subject: Gas flaring events at GC3, FS3 To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC ]ennifer.hunt(malaska.gov dave robv(@alaska.gov victoria ferguson(a)alaska.gov From: Kellie Okonek, GPB Production Optimization Team Leader A flaring event occurred at GC3 starting at 10/18/2014 14:13 and stopping at 10/18/2014 23:40 with a volume of 1260 (MSCF). The event lasted for 567 minutes, and was due to spin cooling of K-7001 LPS compressor for water washing and planned maintenance. A flaring event occurred at GC3 starting at 10/17/2014 15:30 and stopping at 10/17/2014 16:58 with a volume of 56833 (MSCF). The event lasted for 88 minutes. The event had a volume greater than 5000 (MSCF), and was due to depressurization of X -pad for planned maintenance. A flaring event occurred at GC3 starting at 10/16/2014 16:00 and stopping at 10/16/2014 22:58 with a volume of 1140 (MSCF). The event was a black smoke event. The event lasted for 418 minutes, and was due to spin cooling of K-7000 LPS compressor for water wash. A flaring event occurred at FS3 starting at 10/15/2014 15:02 and stopping at 10/15/2014 16:32 with a volume of 415 (MSCF). The event lasted for 90 minutes, and was due to 1802 STV/IP turbine shutdown due to IP.21 control issues. Flaring stopped when machine re -started. Please let me know if you have any questions. Kellie Okonek PCC/EOC Production Optimization TL Office: (907) 659-4472 Cell: (907) 382-1370 akopspcceoctl@ bp.com Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj Sent: Friday, October 24, 2014 8:05 AM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; Kruger, Dale O; Hauger, Wayne A; AK, OPS PCC EOC TL; AK, OPS GC3 Facility & Field OTL; AK, OPS GC3&PCC OSM; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM K, OPS CGF OTL; AK, OPS CCP CGF OSM Subject: Gas flaring events affiNOWC1, CGF To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC Jennifer hunt5alaska.00v dave robvCo-alaska.00v victoria ferouson(5alaska oov From: Kellie Okonek, GPB Production Optimization Team Leader A flaring event occurred at GC3 starting at 10/24/2014 05:27 and stopping at 10/24/2014 19:55 with a volume of 6542 (MSCF). The event lasted for 868 minutes. The event had a volume greater than 5000 (MSCF), and was due to planned s/d of B-pad/HP production and an unplanned s/d of K-5500 wet gas compressor. Flaring slowed when depressurization was completed, but continued as K-5500 troubleshooting progressed. A flaring event occurred at GCI starting at 10/23/2014 07:51 and stopping at 10/23/2014 20:51 with a volume of 1030 (MSCF). The event lasted for 780 minutes, and was due to s/d and depressure of K-3300 GLT compressor. A flaring event occurred at CGF starting at 10/19/2014 13:40 and stopping at 10/19/2014 23:59 with a volume of 99321 (MSCF). The event lasted for 619 minutes. The event had a volume greater than 5000 (MSCF), and was due to MI compressor s/d to accommodate safe lifting operations. Flaring stopped when the MI compressor was re -started. Please let me know if you have any questions. Kellie Okonek PCC/EOC Production Optimization TL Office: (907) 659-4472 Cell: (907) 382-1370 akopspcceoctl@bo.com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION DECEIVED NOV 18 2014 :-,,OGCiC 1. Facility Number 0290000033 2. Facility Name PBU GC 3 3. Field PBU - WOA 4. Operator IBP 5. Month/Year of Disposition I October -2014 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 65,775 10. Pilot and Purge 13,284 11. Assist Gas 0 12. Fuel gas used in lease operations. 477,366 13. Other (see instructions) 0 Official Use Only Authorization >1 hr. Safety 05 ��-�- MCF 14. TOTAL VOLUME (ITEMS 6.12) 556,425 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 Commissioner Dale 18. Transferred to: (Express as a negative #) CGF -22,380,378 19. Remarks: I hereby certify that the f9irgoing it; true and pomect to the best of my knowledge. Signature bm Title Mana er Production Taxes and Royalties Alaska 'j Printed Name Diane ColleyPhone (907) 564-5775 Date I1 / q Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235. Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate Events less than or equal to 1 hour TOTAL 0 BP EXPLORATION (ALASKA) INC. a 14 V a.. F e PRUDHOE BAY UNIT - GC -3 Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME GAS FLARING INCIDENT REPORT NOV 18 ze"e 9 October 2014 56,833 10/18/2014 1413-2340 1,260 ®n C TOTAL Unplanned Events < 1 Hour 0 Unplanned Events> 1 Hour DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events <= 1 hr Not required for unplanned events <=1 hr DATE TIME VOLUME DESCRIPTION OF IN, 10/24/2014 0527-1955 6,542 See Attachments TOTAL 6,542 Planned Events Less Than or Eaual 1 Hour AND <= 5,000 mcf & CAUSE See Attachments See Attachments See Attachments CAUSE TOTAL 0 Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 10/16/2014 1600-2258 1,140 See Attachments See Attachments 10/17/2014 1530-1658 56,833 10/18/2014 1413-2340 1,260 TOTAL 59,233 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events> 1 Hour 6,542 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 59,233 exceeding 5,000 MCF Pilot Purge 13,284 Assist 0 TOTAL FLARED VOLUME 79,059 11/13/2014 2:39 PM Flare Start Date 10/01/2014 Flare End Date 10/312014 GC3 Flare Report Total Volume (MSCF) 65775 Report Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 14-425 Flare Relief 10/16/2014 4:00:00 pm 10:58:00 pm 418 min Yes Yes Yes BPI\LORFA3 1140 Determination Cause spin cool GT -7000 for maintenance work and occasional flaring due to plant rate increase (A pad coming online) Black smoke occured during first 30 minutes due to PV -611 opening to 30" bum pit on initial gas surge and not reseating properly. Valve should not have opened at pressures registered on header and required research to discover cause of black smoke and reseal the valve. Action Taken Cool down complete and plant stabilized. Action taken to stop Black smoke required checking Rupture Disk, when we discovered it was _ -- _--. -intact we moved -to'PV-614..-Thoughitappeared4o beclosed ithad-notreseated-properly_-Weopened-PV-6t}antl-reclosedit.Valve --- resealed property and Black smoke event ended. 14-425 Flare Relief 10/17/2014 3:30:00 pm 4:58:00 pm 88 min No No Yes BPIUGHNSOM 56833 Determination Cause Flared while de -pressuring X -pad for planned repair work Action Taken Stopped flaring when X -pad de -pressured and safe out for work. 14-429 Flare Relief 10/18/2014 2:13:00 pm 11:40:00 pm 567 min Yes No Yes BPI\LORFA3 1260 Determination Cause Spin cool and re -start of GT -7001 for maintenance work. Action Taken work completed. 14-440 Flare Relief 10/24/2014 5:27:00 am 7:55:00 pm 868 min Yes No No BPI\MARTINJt bb4L Determination Cause #1 shut down HP production and "B" Pad shut down and depressure. #2 K-5500 shut down. Action Taken #1 B wellpad and HP line depressurization completed. -- - - #2 Flaring was -permitted -to�oonttnuewhile GC- operetionspersonnelattemptedto restart the -equipment; K-5500:- 5 of restarts attempted and equipment was re -started at 19:55 hrs.. Total Volume (MSCF) 65775 DECEIVE NOV 18 2014 AOGCC Generated 11/17/2014 9:25:27AM Page 10 of 10 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION [)EC 16 2014 A0GCG 1. Facility Number 0290000033 2. Facility Name PBU GC 3 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition November -2014 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 13,714 11. Assist Gas 0 12. Fuel gas used in lease operations. 489,138 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6.12) 502,852 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 Commissioner Date 18. Transferred to: (Express as a negative # CGF ( p 9 ) -23,244,842 19. Remarks: I hereby certify that the Aregoing is true antl correct to the best of my knowledge. Note: All volumes must be corrected Signature W / µ Title Mana er Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date / AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit m Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Fal 2CE; VED JAN 16 2015 AOGCC 1. Facility Number2. 0290000033 Facility Name PBU GC 3 3. Field PBU - WOA 4. Operator IBP 5. MonthNear of Disposition I December -2014 Disposition Volume MCF 20. Forpmduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 1,023 10. Pilot and Purge 17,270 11. Assist Gas 0 12. Fuel gas used in lease operations. 515,353 13. Other (see instructions) U Official Use OnlyAuthorization >1 hr: Safety J I o2 3 MCF 14. TOTAL VOLUME (ITEMS 6.12) 533,646 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 / Commissioner Dale 18. Transferred to: (Express as a negative #) CGF -23,533,643 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. /,/�� �Annn //�'�/1/�����/ Signature eJ(GI/1 e Ca I - Title Mana er Production Taxes and Ro alties Alaska Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 AAC25.235. ii �— Printed Name Diane Colley Phone (907) 564-5775 Date (rTL Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -3 GAS FLARING INCIDENT REPORT December 2014 JAN 16 2015 Unplanned Events less than or equal to 1 hour 1 DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr TOTAL 0 Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 12/8/2014 0532-1210 1,023 See Attachments See Attachments TOTAL 1,023 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Planned Events Exceeding 1 Hour OR > 5,000 mcf _ 1 See Attachments TOTAL 0 TOTAL Unplanned Events < I Hour 0 Unplanned Events> 1 Hour 1,023 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events> 1 hour or 0 exceeding 5,000 MCF Pilot Purge 17,270 Assist 0 TOTAL FLARED VOLUME 18,293 See Attachments Page 8 1/14/2015 10:49 AM Flare StartDate 12/01/2014 Flare End Date 12/31/2014 Report Numbs System rjE ED GC3 Flare Report Zvi 2015 P Total Volume (MSCF) 7023 Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 14-504 Flare Relief 12/08/2014 5:32:00 am 12:10:00 pm 398 min No No No or i1arnuv Determination Cause `Net Gas compressor shutdown because of control instrumentation failure associated with a faulty instrumentation. Action Taken Flaring was permitted to continue while GC operations personnel attempted to restart the equipment. 2 restarts attempted at 11:00 hM, -4"04� Daily Volume (MSCF) 1023 Total Volume (MSCF) 7023 Page 8 of 8 Generated 01/08/2015 9:27:01AM Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Wednesday, December 10, 2014 6:20 PM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; Hauger, Wayne A; AK, OPS GCI OSM; AK, OPS GC1 Facility OTL; AK, OPS GC2 OSM; AK, OPS GC2 Facility OTL; AK, OPS GC3&PCC OSM; AK, OPS GC3 Facility & Field OTL Subject: Flaring Events at GC1, GC2, ander Categories: Attention To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC iennifer.hunt(d)alaska.00v dave.robvCawlalaska.gov victoria.ferousonaalask a.aov From: Wendy Hiester, Production Optimization Team Leader A flaring event occurred at GC3 starting at 12/08/2014 05:32 and stopping at 12/08/2014 12:10 with a volume of 1023 (MSCF). The event lasted for 398 minutes and occurred when the Wet Gas compressor shutdown because of control/instrumentation failure associated with a faulty instrumentation. Flaring was permitted to continue while GC operations personnel attempted to restart the equipment. Flaring stopped when the compressor was restarted successfully. A flaring event occurred at GC2 starting at 12/05/2014 14:32 and stopping at 12/05/2014 17:26 with a volume of 1088 (MSCF). The event lasted for 174 minutes and occurred when the IP compressor was shut down because of a problem associated with re -start of production following plant shutdown. Flaring was permitted to continue while GC operations personnel attempted to restart the equipment. Flaring stopped when the compressor was restarted successfully. A flaring event occurred at GC I starting at 12/05/2014 14:30 and stopping at 12/05/2014 23:00 with a volume of 5050 (MSCF). The event lasted for 510 minutes. The event had a volume greater than 5000 (MSCF) and occurred when GC2 shut down causing the LP/IP compressors to lose flow. Flaring stopped when GC2 started flowing oil to GCI and gas rate increased so that forward flow was reestablished in the LP/IP machines. Please let me know if you have any questions, Wendy Hiester (alt. Kellie Okonek) PCC/EOC Production Optimization TL external: (907) 659 4472 (BOC) / 5566 (PBOC) cell: (907) 227-7144 Harmony: 758 4404 Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100) e-mail akopspcceoctlC@bo.com