Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutPBU GC 3 Gas DispositionState of Alaska AOGCC
Gas Disposition Files
Year: 2014
Facility: PBU GC 3
Operator: BP EXPLORATION (ALASKA)
R—UV 1 J" v
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000033
2. Facility Name
PBU GC 3
3. Field
PBU - WOA
4. Operator
BP
5. MonthlYear of Disposition
January -2014
Disposition
Volume MCF
20. Forproduction /turn multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
8. Flared or vented 1 hour or less
45
9.. Flared or vented more than 1 hour (see instr.)
3,261
10. Pilot and Purge
15,124
11. Assist Gas
0
12. Fuel gas used in lease operations.
536,432
13. Other (see instructions)
0
Official Use Only
Authorization >t hr.
Safe b
� 2 � /
MCF
14. TOTAL VOLUME (ITEMS 6.12)
554,862
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
—q
Commissioner Date
16. Transferred to: (Express as a negative#) CGF
-24,227,544
19. Remarks: Revised to include > 1 hour flaring events reported to AOGCC in e-mail on 2-24-14 by Travis Rybicki (BP PCC-EOC TL)
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature1 Title Manager Production Taxes and Royalties Alaska
Printed Name Diane Coll e Phone (907) 5645775 Date �' 2-�
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.
v�r-
6i3/i f
Form 10422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -3
GAS FLARING INCIDENT REPORT
January 2014
REVISED 02-24-2014
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT& CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 0
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT &CAUSE ACTION TAKEN TO ELIMINATE CAUSE
1/20-31/2014 0248-2400 3,261 See Attachments See Attachments
TOTAL 3,261
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT&CAUSE ACTION TAKENTO ELIMINATE CAUSE
1/21/2014 0630-0715 45 See Attachments See Attachments
TOTAL 45
TIME
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
0
TOTAL
a
3,261
45
0
15,124
0
18,430
DESCRIPTION OF IN,
See Attachments
ACTION TAKEN TO E
See Attachments
Page 1
2/25/2014
3:15 PM
Flare Start Dale 01101/2014
Flare End Date 01/31/2014
GO Flare Report
Total Volume (MSCF) 3306
Report
Numbe System
Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By
Volume
14-22 Flare RelieF 01/20/2014 2:48:00 am 12:00:00 am 1272 min Yes No No BPI\dOHNSOM
1281
Determination Cause
Production bank shutdown and de -pressured to keep pressure Im due to minor leak
WOA stopped bringing production rates into bank and lowered flare valve setpoint to keep pressure low in vessel V-301 a_ W81 continue until
Action Taken
- -
2.6.14 when repairscanbecotnpleled: --
14-9 Flare Relief 01/21/2014 12:00:00 am 12:00:00 am 1440 min Yes No No BP1\JOHNSOM
180
Determination Cause
Production bank shutdown and de -pressured to keep pressure low due to minor leak
Action Taken
WDA stopped bringing production rates into bank and lowered flare valve setpoint to keep pressure low in vessel V-301 a
144 Flare Relief 01/21/2014 6:30:00 am 7:15:00 am 45 min No No Yes BPI\HAWKJS
45
Determination Cause
Depressure the A HP Seperelor for a leak check on the divert valves on the "A' Header.
Action Taken
Depressured Separator to 0 psi and closed the flare valve.
_
14-23 Flare Relief 01/22/2014 12:00:00 am 12:00:00 am 1440 min Yes No No BPIUGHNSOM
180
Determination Cause
Production bank shutdown and de -pressured to keep pressure lowdue to minor leak
WOA stopped bringing production rates into bank and lowered flare valve setpoint to keep pressure low In vessel V -301a
Action Taken
14-24 Flare Relief 01/23/2014 12:00:00 am 12:00:00 am 1440 min Yes No No BPIUGHNSOM
180
Determination Cause
Production bank shutdown and de -pressured to keep pressure low due to minor leak
Action Taken
WOA stopped barging production rates into bank and lowered flare valve setpoint to keep pressure low in vessel V-3019
14-25 Flare Relief
01/2412014 12:00:00 am 12:00:00 am 1440 min Yes No No BPIUGHNSOM
180
Determination Cause
Production bank shutdown and de -pressured to keep pressure low due to minor leak
Action Taken
WOA stopped bringing production rates into bank and lowered flare valve setpoint to keep pressure low in vessel V -301a
14-26 Flare Relief 01/25/2014 12:00:00 am 12:00:00 am 1440 min Yes No No BPIUGHNSOM
180
Determination Cause
Production bank shutdown and de -pressured to keep pressure low due to minor leak
Action Taken
WOA stopped bringing production rates Into bank and lowered flare valve setpoint to keep pressure low in vessel V -301a
14-27 Flare Relief
01/26/2014 12:00:00 am 12:00:00 am 1440 min Yes No No BPIUGHNSOM
180
Determination Cause Production bank shutdown and de -pressured to keep pressure low due to minor leak
Action Taken WOA stopped bunging production rates into bank and kwrered flare valve setpoint to keep pressure low In vessel V-301 a
14-26 Flare Relief 01/2712014 12:00:00 am 12:00:00 am 1440 min Yes No No BPIUGHNSOM 180
Determination Cause Production bank shutdown and de -pressured to keep pressure low due to minor leak
Action Taken WOA stopped bringing production rates info bank and lowered flare valve setpoint to keep pressure low in vessel V -301a
14-29 Flare Relief 01/28/2014 12:00:003M 12:00:OOant 1440MIn Yes No No BPIUGHNSOM 180
Determination Cause Production bank shutdown and de -pressured to keep Preesure low due to minor leak
Action Taken WOA stopped bringing production rates into bank and lowered flare valve setpoint to keep pressure low in vessel V -301a
14-30 Flare Relief 01/2912014 12:00:00 am 12:00:00 am 1440 min Yes No No BP1UGHNSOM 180
Generated 02/24/2014 4:53:31 PM Page 1 of
Flare StartDate 01 /0112 01 4
Flare End Date 01 /3112 01 4
Determination Cause Production bank shutdown and de -pressured to keep pressure low due to minor leak
Action Taken WOA stopped banging produc0on rates into bank and lowered flare valve setpoint to keep pressure low in vessel V -301a _.
14.31 Flare Relief 01/30/2014 12:00:OOam 12:00:00am 1440min Yes No No BPIUGHNSOM 180
Determination Cause Production bank shutdown and de -pressured to keep pressure low due to minor leak
Action Taken WOA stopped banging production miss into bank and lowered flarevalve setpoini to keep pressure low In vessel V -301e
14-32 Flare Relief 01/31/2014 12:00:00 am 12:00:00 am 1440 min Yes No No BPIUGHNSOM 180
Determination Cause Production bank shutdown and de -pressured to keep pressure low due to minor leak
Action Taken WOA stopped bringing production rates into bank and lowered flare valve setpoint to keep pressure low in vessel V-301 a
Total Volume (MSCF) 3306
Page 2 of 2
Generated 02/24/2014 4:53:31 PM
unt, Jennifer L ovA com]
AK, OPS PCC EO 24 ZIgA40P41 PMEOCTL@bp.
rom: Monday, February
,nson, Gary A;
ent: Hunt, Jennifer L (DOA)
o: Ferguson, victona L (DOA); Roby, David SS (DOA); Facility);t& Field 1eOT Alejandra;
OPS GC3&PCC
%c:Arthur, Gregory; Kruger, Dale O;
OSM; AK, HSSEE Env Adv West
Gas flaring events a
tISM
Subject:
CC: Dave Roby, AOGCC
CC: Victoria Ferguson, AOGCC
To: Jennifer Hunt, AOGCC
dave rob &alaskaoo_v
victoria ferausonAalaska.gov
ennifer huntC�alaska.00v
From: Travis Rybicki, GPB Production Optimization Team Leader on further review of the facility engineer.
The below events have been corrected in our internal flare database upon m at 01/21/2014 with a volume of 1281
at 01/20/2014 02:48 and stopping production bank to keep
A flaring event occurred at GC3 starting but valve leakage caused
(MSCF). The event lasted for 1272 minutes
roducuo was
� as reduced t minimize flaring,
pressure off of a minor leak. Incoming p laced back in service.
daily flaring until the leak could be repaired and the bad p rn at 01/22/2014 with a volume of 180
Flaring
continued at GC3 starting at 01/21/2014 00:00 and stopping
(MSCF). The event lasted for 1440 minutes. in at 01/23/2014 with a volume of 180
Flaring continued at GC3 starting at 01/22/2014 00:00 and stopping
(MSCF). The event lasted for 1440 minutes* at 01/24/2014 with a volume of 180
Flaring continued at GC3 starting at 01/23/2014 00:00 and stopping
(MSCF). The event lasted for 1440 minutes. at 01/25/2014 with a volume of 180
Flaring continued at GC3 starting at 01/24/2014 00:00 and stopping
(MSCF). The event lasted for 1440 minutes. in at 01/26/2014 with a volume of 180
Flaring continued at GC3 starting at 01/25/2014 00:00 and stopping
(MSCF). The event lasted for 1440 minutes. in at 01 /27/2014 with a volume of 180
Flaring continued at GC3 starting at 01/26/2014 00:00 and stopping
(MSCF). The event lasted for 1440 minutes. in at 01/29/2014 with a volume of 180
Flaring continued at GC3 starting at 01 /27/2014 00:00 and stopping
(MSCF). The event lasted for 1440 minutes. in at O1 /29/2014 with a volume of 180
Flaring continued at GC3 starting at 01/28/2014 00:00 and stopping
(MSCF). The event lasted for 1440 minutes.
Flaring continued at GC3 starting
at 01/29/2014 00:00 and stopping at 01/30/2014 with a volume of 180
- (MSCF). The event lasted for 1440 minutes. 1
Flaring continued at GO starting at 01/30/2014 00:00 and stopping at 01/31/2014 with a volume of 180
(MSCF). The event lasted for 1440 minutes.
Flaring continued at GO starting at 01/31/2014 00:00 and stopping at 02/01/2014 with a volume of 180
(MSCF). The event lasted for 1440 minutes.
Flaring continued at GC3 starting at 02/01/2014 00:00 and stopping at 02/02/2014 with a volume of 180
(MSCF). The event lasted for 1440 minutes.
Flaring continued at GO starting at 02/02/2014 00:00 and stopping at 02/03/2014 with a volume of 180
(MSCF). The event lasted for 1440 minutes.
Flaring continued at GO starting at 02/03/2014 00:00 and stopping at 02/04/2014 with a volume of 180
(MSCF). The event lasted for 1440 minutes.
Flaring continued at GO starting at 02/04/2014 00:00 and stopping at 02/05/2014 with a volume of 180
(MSCF). The event lasted for 1440 minutes.
Flaring continued at GO starting at 02/05/2014 00:00 and stopping at 02/05/2014 11:24 with a volume of 90
(MSCF). The event lasted for 684 minutes. Flaring stopped when the leak was repaired and the bank placed
back in service.
Please let me know if you have any questions.
Travis M. Rybicki
PCC.EOC (Production Optimization) Team lead
Office 907-659-4472 (BOC) 659-5566 (PBOC)
Cell 907-748-2118 Harmony 758-4404
GPB Pager 907-659-5272 # 1890
a kopspcceoctlna. bp. com
Alternate: Kellie Okonek
STATE OF ALASKA
Ary.�_till�_��I�Ze7�YK�I�FY_���ltii[iP�[�Zi tI�I�IF�9[�I�I
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000033
2, Facility Name
PBU GC 3
3. Field
PBU - WOA
4. Operator
IBP
5. MonthNear of Disposition
February -2014
Disposition
Volume MICE
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
810
10. Pilot and Purge
13,986
11. Assist Gas
0
12. Fuel gas used in lease operations.
485,586
13. Other (see instructions)
Q
Official Use Only
Authorization>1 hr:
Safety
� � G�
MCF
14. TOTAL VOLUME (ITEMS 6-12)
500,382
Lease Use
MCF
15. NGL Gas Equivalent
Q
Conservation
MCF
16. Purchased gas
Q
Waste:
MCF
17. Transferred from:
0
/�
Commissioner l0 iDate
18. Transferred to: (Express as a negative #) CGF
-22,245,329
19. Remarks:
I hereby certify that a foregoing is true and correct to the best of my knowledge.
��� j1 �� Note: All volumes must be corrected
Signature �(� Title Mana er Production Taxes qnd RZpyalties Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Dat / 4_/ AAC25.235.
VLF
1,1314
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
TOTAL
i
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -3
GAS FLARING INCIDENT REPORT
February 2014
Not required for unplanned events <=1 hr Not required for unplanned events <= 1 hr
2/1-5/2014
0000-1124
810 See Attachments See Attachments
TOTAL
810
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO E
See Attachments See Attachments
TOTAL 0
Planned Events Exceeding 1 Hour OR > 5.000 mcf
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
0
TOTAL
0
810
0
0
13,986
0
14,796
See Attachments
See Attachments
CAUSE
Page 9
3/12/2014
4:56 PM
Flare Start Date 02/01/2014
Flare End Date 02/28/2014
Report
Numbs System Date
GC3 Flare Report
Total Volume (MSCF) 810
Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
14-33 Flare Relief 02/01/2014 12:00:00 am 12:00:00 am 1440 min Yes No No uriuvnrva�i
Determination Cause Production bank shutdown and de -pressured to keep pressure low due to minor leak
Action Taken WOA stopped bringing production rates into bank and lowered Bare valve setpoint to keep pressure low in vessel V_301a_
14-34 Flare Relief 02/02/2014 12:00:00 am 12:00:00 am 1440 min Yes No No BPIWOHNSOM
Determination Cause Production bank shutdown and de -pressured to keep pressure low due to minor leak
Action Taken WOA stopped bringing production rates into bank and lowered Flare valve setpoint to keep pressure low in vessel V-301 a
180
14-35 Flare Relief 02/03/2014 12:00:00 am 12:00:00 am 1440 min Yes No No BPIWOHNSOM 180
Determination Cause Production bank shutdown and de -pressured to keep pressure low due to minor leak
Action Taken WOA stopped bringing production rates into bank and lowered flare valve setpoint to keep pressure low in vessel V -301a
14-36 Flare Relief 02/04/2014 12:00:00 am 12:00:00 am 1440 min Yes No No BPIUGHNSOM 180
Determination Cause Production bank shutdown and de -pressured to keep pressure low due to minor leak
Action Taken WOA stopped bringing production rates into bank and lowered flare valve setpoint to keep pressure low in vessel V -301a
14-37 Flare Relief 02/05/2014 12:00:00 am 11:24:00 am 684 min Yes No No BPIWOHNSOM 90
Determination Cause Production bank shutdown and de -pressured to keep pressure low due to minor leak
Action Taken WOA stopped bringing production rates into bank and lowered flare valve setpoint to keep pressure low in vessel V -301a
Total Volume (MSCF) 810
Generated 03/04/2014 2:15:08PM Page 9 or a
rom:
ent:
'o:
;c:
Subject:
L DOA
AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comi
Monday, February 24, 2014 3:41 PM
Gary A;
Hunt, Jennifer L (DOA) Roby, David S (DOA); Castano, Alejandra; BOPS GC3&PCC
on
Ferguson, victoria L (DOA);
Arthur, Gregory; Kruger, Dale O; AK, OPS GC3 Facility &Field OTL; A
OSM; AK, HSSEE Env Gas v West
flaring evens at GC3
AOGCC CC: Dave Roby, AOGCC
To: Jennifer Hunt,
dave robyC�alaska aov
enniferhuntgalaska.gov
CC: Victoria Ferguson, AOGCC
victoria fergusonC�alaska aov
From: Travis Rybicki, GPB Production Optimization Team Leader engineer.
eview of the
The below events have been corrected in our internal flare database upon further at Ol/21/2014cwith avolume of 1281
production bank to keep
A flaring event occurred at GC3 starting at 01/20/2014 02o and stopping but valve leakage caused
(MSCF). The event lasted for 1272 minuesand away reducedrtosmiin minimize
Hazing,
pressure off of a minor leak. Incoming production laced back in service.
daily flaring until the leak could be repaired and the bank placed
Flaring continued at GC3 starting at 01/21/2014 00:00 and stopping at 01/22/2014 with a volume of 180
(MSCF). The event lasted for 1440 minutes.
Flaring continued at GC3 starting at 01/22/2014 00:00 and stopping at 01/23/2014 with a volume of 180
(MSCF). The event lasted for 1440 minutes. in at 01 /24/2014 with a volume of 180
Flaring continued The event la t d for starting
at 01/23/2014 00:00 and stopping
(MSCF). at 01/25/2014 with a volume of 180
Flaring continued at GC3 starting at 01/24/2014 00:00 and stopping
(MSCF). The event lasted for 1440 minutes.
Flaring
continued at GC3 starting at 01/25/2014 00:00 and stopping at 01/26/2014 with a volume of 180
(MSCF). The event lasted for 1440 minutes.
Flaring
continued at GC3 starting at 01/26/2014 00:00 and stopping at 01/27/2014 with a volume of 180
(MSCF). The event lasted for 1440 minutes.
Flaring
continued at GC3 starting at 01/27/2014 00:00 and stopping at 01/28/2014 with a volume of 180
(MSCF). The event lasted for 1440 minutes.
Flaring continued at GC3 starting
at 01/28/2014 00:00 and stopping at 01/29/2014 with a volume of 180
(MSCF). The event lasted for 1440 minutes.
Flaring continued at GC3 starting
at 01/29/2014 00:00 and stopping at 01/30/2014 with a volume of 180
(MSCF). The event lasted for 1440 minutes. 1
Flaring continued at GO starting at 01/30/2014 00:00 and stopping at 01/31/2014 with a volume of 180
(MSCF). The event lasted for 1440 minutes.
Flaring continued at GO starting at 01/31/2014 00:00 and stopping at 02/01/2014 with a volume of 180
(MSCF). The event lasted for 1440 minutes.
Flaring continued at GO starting at 02/01/2014 00:00 and stopping at 02/02/2014 with a volume of 180
(MSCF). The event lasted for 1440 minutes.
Flaring continued at GO starting at 02/02/2014 00:00 and stopping at 02/03/2014 with a volume of 180
(MSCF). The event lasted for 1440 minutes.
Flaring continued at GO starting at 02/03/2014 00:00 and stopping at 02/04/2014 with a volume of 180
(MSCF). The event lasted for 1440 minutes.
Flaring continued at GC3 starting at 02/04/2014 00:00 and stopping at 02/05/2014 with a volume of 180
(MSCF). The event lasted for 1440 minutes.
Flaring continued at GO starting at 02/05/2014 00:00 and stopping at 02/05/2014 11:24 with a volume of 90
(MSCF). The event lasted for 684 minutes. Flaring stopped when the leak was repaired and the bank placed
back in service.
Please let me know if you have any questions.
Travis M. Rybicki
PCC-EOC (Production Optimization) Team Lead
office 907-659-4472 (BOC) 659-5566 (PBOC)
Cell 907-748-2118 Harmony 758-4404
GPB Pager 907-659-5272 # 1890
akoPspcceoctI(CDbq. com
Alternate: Kellie Okonek
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000033
2. Facility Name
PBU GC 3
3. Field
PBU - WOA
4. Operator
BP
5. MonlhNear of Disposition
March -2014
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
U
Pool Name Pool Code Percent
7. Reinjected
D
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
12,884
11. Assist Gas
0
12. Fuel gas used in lease operations.
531,824
13. Other (see instructions)
U
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
544,708
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from:
0
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-25,869,578
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature(!// KqM� Title Manager Production Taxes and Royalties Alaska
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.
Printed Name Diane Colley Phone (907) 564-5775 Date �11111
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000033
2. Facility Name
PBU GC 3
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
April -2014
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
8. Flared or vented 1 hour or less
2,015
9. Flared or vented more than 1 hour (see instr.)
1,399
10. Pilot and Purge
12,649
11. Assist Gas
0
12. Fuel gas used in lease operations.
481,975
13. Other (see instructions)
0
Official Use Only
Authorization >t hr
Safety2
G
✓ !
MCF
14. TOTAL VOLUME (ITEMS 6-12)
498,038
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-21,611,550
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature '^'r ^ Title Mans er Production Taxes and Ro alties Alaska
Printed Name Diane ColleyPhone (907) 564-5775 Date �/� /
Note: All volumes must be corrected
to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
AAC25.235.
VL i=
,-`24 (1¢
Form 10-422 Rev. W009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALA5KA) Irv.
PRUDHOE BAY UNIT - GC -3
GAS FLARING INCIDENT REPORT
April 2014
ACTION TAKtry I V cU' ,-'-. - -• ---
nplanned Events less than or equal t0 VOLUME DESCRIPTION Of INCIDENT &CAUSE Not required for unplanned events <=1 hr
DATE TIME
4/5/2014 1615-1640 1,910 Not required for unplanned events <= 1 hr
4/11/2014 0313-0322 105�—
TOTAL
2,015
4/6/2014
TOTAL
han or
See Attachments
0
VOLUME DESCRIPTION OF IN(
See Attachments
TOTAL
'ding 1 Hour OR
TIME
0033-0457
TOTAL
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
> 5,000 mcf
VOLUME DESCRIPTION OF INI
1,399 See Attachments
1 399
TOTAL
2,015
0
0
1,399
12,649
0
16,063
See Attachments
See Attachments
ACTION TAKEN TO t
See Attachments
Page 8
5/15/2014
10'.51 AM
Flare Start Date 04101/2014
Flare End Date 04/30/2014
Report
Numbe System
GC3 Flare Report Total Volume (MSCF) 3414
Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
14-111 Flare Relief 04/06/2014 12.33:00 am 4:57:00 am 264 min No
Determination Cause LPS Compressor K-7001 shutdown for upcoming water wash.
Action Taken Completed spin cool.
Generated 05/05/2014 10:32:25AM
No Yes BPI\BLUEKES 1399
Total Volume (MSCF) 3414
Page 9 of 9
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000033
2. Facility Name
PBU GC 3
3. Fieltl
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
Ma -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
30
10. Pilot and Purge
16,276
11. Assist Gas
0
12. Fuel gas used in lease operations.
508,232
13. Other (see instructions)
0
Official Use Only
Authorization>1 hr:
Safety
�C7
MCF
14. TOTAL VOLUME (ITEMS 6-12)
524,538
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-22,250,361
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature Title Manager Production Taxes and Ro alties Alaska
Note: All volumes must be corrected
to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
AAC25.235.
Printed Name Diane Colley Phone (907) 564-5775 Date
VL -F
to/ZG//y
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT -GC -3
GAS FLARING INCIDENT REPORT
May 2014
Events less than or equal to 1
DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 0
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
5/12/2014 1010-1130
30 See Attachments
See Attachments
TOTAL
30
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
See Attachments
TOTAL
0
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
See Attachments
TOTAL
0
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events > 1 Hour
30
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events> 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
16,276
Assist
0
TOTAL FLARED VOLUME
16,306
Page 9
6/12/2014
10:40 AM
Flare Start Date 05/01/2014
Flare End Date 05/31/2014
GC3 Flare Report Total Volume (MSCF) 30
Report
Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
14-161 Flare Relief 05/12/2014 10:1000 am 11:30:00 am 80 min Yes
Determination Cause Plant upset due to flare valve oft seat on test separator.
Action Taken Reseated valve.
No No BP1\MOORDV 30
Total Volume (MSCF) 30
Generated 06/03/2014 9:13:32AM Page 10 of 10
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000033
2. Facility Name
PBU GC 3
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
I June -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
U
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
15,163
11. Assist Gas
0
12. Fuel gas used in lease operations.
317,574
13. Other (see instructions)
0
Oficial Use OnlyMCF
Authorization >t hr:
Safety
14. TOTAL VOLUME (ITEMS 6-12)
332,737
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-14,837,373
19. Remarks:
I hereby certify that theforegoingis true and correct to the best of my knowledge.
l/art, / y'ly% Note: All volumes must be corrected
Signature aG4GVf l,L�� Title Maria er Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
71 temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date y' AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000033
2. Facility Name
PBU GC 3
3. Field
PBU - WOA
4. Operator
BP
5. MonthlYear of Disposition
July -2014
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
8. Flared or vented 1 hour or less
28,472
✓
9. Flared or vented more than 1 hour (see instr.)
1,282
10. Pilot and Purge
14,584
11. Assist Gas
0
12. Fuel gas used in lease operations.
452,587
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr.
Safety
/ p
Z p
MCF
14. TOTAL VOLUME (ITEMS 6-12)
496,925
Lease Use
MCF
15, NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
n
U y c4
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-20,053,362
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Q(�)�/���n Note: All volumes must be corrected
Signature VsCS.��f tl. Title Maria er Production Taxes and Ro. allies Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date / AAC25.235.
y z- dr
,F/ItIJq
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT -GC -3
GAS FLARING INCIDENT REPORT
July 2014
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
7/24/2014 1624-1644 28,472 Not required for unplanned events <=1 hr Not required for unplanned events <= 1 hr
TOTAL 28,472
7/19/2014
7/20/2014
DATE
DATE
1448-1735
0815-1030
TOTAL
IILLtq
TOTAL
TOTAL
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
1,160 See Attachments
122
1,282
VOLUME
See Attachments
0
TOTAL
28,472
1,282
0
0
14,584
0
44,338
See Attachments
ACTION TAKEN TO ELIMINATE
See Attachments
See Attachments
See Attachments
Page 9
8/14/2014
2:23 PM
Flare StartDate 07/01/2014
Flare End Date 07/31/2014
GC3 Flare Report Total Volume (MSCF) 29754
Report
Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
14-258 Flare Relief 07/19/2014 2:48:00 pm 5:35:00 pm 167 min No No No BPIWOHNSOM 1160
Determination Cause Wet Gas compressor shutdown because of control/instrumentation failure associated with a fault
Action Taken WOA reduced production rates and choked 3 wells equaling 10,000 bwpd. Wells were shut-in or choked back starting at 1&.58 hours__
14-259 Flare Relief 07/20/2014 8:15:00 am 10:30:00 am 135 min Yes No No BPIUGHNSOM 122
Determination Cause High gas transit line pressure caused by CGF compressor work
Action Taken No response taken as this was deemed to be of short duration.
Total Volume (MSCF) 29754
Generated 08/04/2014 11:24:17AM Page 11 of"!
Hunt, Jennifer L (DOA
From:
AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent:
Sunday, July 20, 2014 12:30 PM
To:
Hunt, Jennifer L (DOA)
Cc:
Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, HSSEE Env Adv West; Kruger, Dale O; AK, OPS GC1 Facility OTL; AK,
OPS GC1 OSM; AK, OPS GC2 OSM; AK, OPS GC2 Facility OTL; AK, OPS GC3 Facility &
Field OTL; AK, OPS GC3&PCC OSM
Subject:
Gas flaring events at GC1, GC2, %03
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
0ennifer.hunt(o)alaska.gov dave.roby(o)alaska.gov victoria.fergusonna.alaska.gov
From: Kellie Okonek, GPB Production Optimization Team Leader
GC1
A flaring event occurred at GC1 starting at 06/17/2014 03:00 and stopping at 06/18/2014 with a volume of 1090 (MSCF).
The event lasted for 1260 minutes, and was due to LP compressor instability due to temperature swings. Flaring stopped
when necessary process changes were made.
A flaring event occurred at GC1 starting at 06/20/2014 05:08 and stopping at 06/21/2014 with a volume of 2616 (MSCF).
The event lasted for 1132 minutes, and was due to low oil throughput causing insufficient LP/IP gas.
A flaring event occurred at GC1 starting at 06/21/2014 00:00 and stopping at 06/21/2014 05:25 with a volume of 2408
(MSCF). The event lasted for 325 minutes, and was due to low oil throughput causing insufficient LP/IP gas.
A flaring event occurred at GC1 starting at 06/23/2014 14:10 and stopping at 06/23/2014 15:45 with a volume of 1200
(MSCF). The event lasted for 95 minutes, and was due to a blown UPS fuse causing an LPS compressor shutdown.
Flaring stopped when the compressor was re -loaded.
A flaring event occurred at GC1 starting at 06/25/2014 08:45 and stopping at 06/25/2014 10:00 with a volume of 1437
(MSCF). The event lasted for 75 minutes, and was due to an unplanned shutdown of A/B banks to the GC1 annex.
Flaring stopped when the banks were put back in service.
A flaring event occurred at GC1 starting at 07/02/2014 00:01 and stopping at 07/03/2014 with a volume of 3400 (MSCF).
The event lasted for 1439 minutes, and was due to a UPS power failure to the skid 7 control room. Flaring stopped when
UPS was fixed and power restored.
A flaring event occurred at GC1 starting at 07/03/2014 00:01 and stopping at 07/03/2014 06:30 with a volume of 1600
(MSCF). The event lasted for 389 minutes, and was due to a UPS power failure to the skid 7 control room. Flaring
stopped when UPS was fixed and power restored.
A flaring event occurred at GC1 starting at 07/04/2014 06:00 and stopping at 07/04/2014 12:00 with a volume of 280
(MSCF). The event lasted for 360 minutes, and was due to 2^° stage D -bank backpressure controller issues. Flaring
stopped when the backpressure controller was re -adjusted.
A flaring event occurred at GC1 starting at 07/08/2014 04:00 and stopping at 07/08/2014 22:30 with a vofume of 940
(MSCF). The event lasted for 1110 minutes, and was due to loss of forward flow on IP compressors. Flaring stopped
when temperature/pressure adjustments made to re-establish flow.
A flaring event occurred at GC1 starting at 07/17/2014 18:00 and stopping at 07/18/2014 with a volume of 8170 (MSCF).
The event lasted for 360 minutes. The event had a volume greater than 5000 (MSCF), and was due to depressurization of
Y/P pads for safe -out. Flaring stopped when depressurization was complete.
4 flaring event occurred at GCI starting at 07118/2014 04:00 and stopping at 07/19/2014 with a volume of 6886 (MSCF).
The event lasted for 1200 minutes. The event had a volume greater than 5000 (MSCF), and was due to shutdown and
depressure of GHX tie -line between GC1 &2 for GC2 planned turnaround.
GC2 at
606
A flaring event The eent occurredlastatfoC 09 minutes, 0and3wasldue to hi
h gas transit pressure cau ed by an14 09:16 tincrease n aa volume mbient
(MSCF).
temperatures and EOA 1806 compressor shutdown.
A flaring event occurred at GC2 starting at 07/1212014 21:15 and stopping at 0711 00 (M CF), and was due
to high
with a volume of 7812
(MSCF). The event
The event had
volume greater than
ambient t mpe atur ssted causing t anfor 75lsiit gas system ssues.aFlar ng stopped when5rateswere cut on the EOA.
GC3 in at 07119/2014 17:35 with a volume of 1160
compressor shutdown due to control/instrumentation
Aflaring event occurred at GC3 starting at 0711912014 14:48 and stopping
(MSCF). The event lasted for 167 minutes, and was due to wet gas comp
failure associated with a fault. Production was reduced to minimize flaring.
Please let me know if you have any questions.
Kellie Okonek (alt. Travis Rybicki)
PCCIEOC Production Optimization TL
external:
07) 82 1370 Harmony: 758 59 4472 (soC) 15 4 PBOC)
04
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akopsgcceoctI ba com
Hunt, Jennifer L DOA
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj
Sent: Tuesday, July 22, 2014 8:14 AM
To: Hunt, Jennifer L (DOA)
Cc: Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary
OPS FS1 rOSM; AK, OPS FS2 Facility
OTL; AK, OPS v East; Burgess, DFS2 OSM; AK,, HSSEE Env OPS FSI l'AdvOWest;
PCC OSM; AK, OPS GC3 Facility & Field OTL; Kruger, Dale
Hiester, Wendy; AK, OPS GC3&
O; AK, OPS PCC EOC TL
Subject: Gas flaring events at FS1, FS2
Categories: Work
CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
To: Jennifer Hunt, AOGCC a�„e Dave
Roby, AOGCC
Victoria.ferausonCo�alaska.aov_
nnifPr huntColalaska 4ov
From: Kellie Okonek, GPB Production Optimization Team Leader
F51: at 07120/2014 16:15 with a volume of 1474
A flaring event occurred at FSI starting at 07120/2014 14:25 and stopping
(MSCF). The event lasted for 110 minutes, and was due to depressurization of commonlines and vessels in support of
planned shutdown to change out F5000ESD valve on the gas transit system.
A flaring event occurred at FS1 starting at 07120/2014 10:40 and stopping at 07120/2014 T/C 1 with a volume of 41
(MSCF). The event was a black smoke event, and was due to testing of ESD function of TIC 1803 as it shutdown for the
plant shutdown. in at 07120/2014 23:59 with a volume of 25000
A flaring greater than 5000 (MSCF), and was due to the
event occurred at FSI starting at 0712012014 16:30 an stopping
(MSCF). The event lasted for 449 minutes. The event had a volume g
controlled depressurization of the 42” and 60" gas transit lines in support of safe -out for the F5000V ESD valve
changeout.
at 07121/2014 with a volume of 4000 (MSCF).
F52: of vessels and commonlines for planned
A flaring event occurred at FS2 starting at 07/2012014 15:15 and stopping
The event
tdownfoor 525 m utas, and
was due to shut-in and depressurization
plant s
GC3: in at 07/20/2014 10:30 with a volume of 122
pressure as the Prudhoe east facilities
A flaring event occurred at GC3 starting at 0712012014 08:15 and stopping
(MSCF). The event lasted for 135 minutes, and was due to high
htga system line
bpzed.
ramped down for planned maintenance. Flaring stopped
Please let me know if you have any questions.
Kellie Okonek (alt. Travis Rybicki)
PCCIEOC Production Optimization TL
external:
382)1659 4472 (BOC) 15 370 Harmony: 758 4 PBOC)
04
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akoosocce0c1-I&P com
iunt, Jennifer L
: rom:
Sent:
To:
Cc:
Subject:
AK, O�EOC TL [AKOPSPCCEOCTL@bp.coml
Friday, July 25, 2014 5:31 PM
Hunt, Jennifer L (DOA)
Ferguson, Victoria L (DOA); Roby, David S (DOA); Castano, Alejandra; Benss son, Gary
Arthur, Ern9 Ads K, OAK OPS GC3&PCC AK CPS CPSE Env dGC3 Facility v East; & Field vOTL;
AK
HSSEE
Kruger, Dale O; AK, OPS GC1 OSM; AK, OPS GC1 Facility OTL; AK, OPS FS2 OSM; A ,
OPS FS2 Facility OTL
RE: Gas flaring events at FS1, FS2.100
CC: Dave Roby, AOGCC
To: Jennifer Hunt, AOGCC dave ro_ by@a_1aska qov
iennifer huntCc_alaska.gov
CC: Victoria Ferguson, AOGCC
victoria ferausongalaska.9ov
From: Kellie Okonek, GPB Production Optimization Team Leader
GC1: at 07/2512014 with a volume of 2404 (MSCF)-
GCI*
flaring event occurred at GC1 starting at 0712 , to to 0 it rate
and ringfrom stopping at 0712412014 with a volume of 2946 (MSCF).
The event lasted for 1440 minutes, and was due to low oil rate flaring from the LP/IP.
A flaring event occurred at GC1 starting at 0712312014 00:00 and stopping
The event lasted for 1440 minutes, and was due to low oil rate flaring from the LPIIP.
GC3 in at 0712412014 16:44 with a volume of 28472
rester than 4/20 (MSCF), and was due to a power loss in the LPS section. Flaring
_GC
flaring event occurred at GC3 starting at 0712412014 16:24 and stopping
(MSCF). The event had a volume g
stopped when rates were reduced.
FS2:
minutes, and was due to SII and depressure of plant and drillsite lines for residue gas line
A flaring event occurred FS2 starting at 0712012014 15:15 and stopping at 07/21/2014 with a volume of 4000 (MS
The event lasted for 55
maintenance
and in at 0712112014 with a volume of 25000 re of EOA
A flaring event occurred at FS2 starting at 0712012014 15:15 h n 5000 (MSCF), and was due to dep
The event lasted for 525 minutes. The event had a volume greater
residue gas transit system along with FS -1 for planned ESD valve replacement.
Please let me know if you have any questions.
Kellie Okonek (alt. Travis Rybicki)
PCCIEOC Production Optimization TL
external: (907) 659 4472 (BOC 75554404PBOC)
cell: (907) 382 1370 Harmony:
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100
e-mail akpsocceoctlCr by com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000033
2. Facility Name
PBUGC 3
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
August -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
3,855
10. Pilot and Purge
14,030
11. Assist Gas
0
12. Fuel gas used in lease operations.
467,541
13. Other (see instructions)
0
Official use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
485,426
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
Commissioner Dale
18. Transferred to: (Express as a negative #) CGF
-20,035,665
19. Remarks:
1 hereby certify that tp? foregoing is try a d mect to the best of my knowledge.
n /'11�n�/l��
oaf
Signature dL a li l Ii�CY.�; Title Manager Production Taxes a d Royalties Alaska
Printed Name Diane Colley Phone (907) 564-5775 Date 409
Note: All volumes must be corrected
to pressure of 14.65 psla and to a
temperature of 60o F. Authority 20
AAC25.235.
Vr
f a! 7-i f 1
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT -GC -3
GAS FLARING INCIDENT REPORT
August 2014
Not required for unplanned events <= 1 hr
Not required for unplanned events <=1 hr
TOTAL 0
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
8/7-8/2014 1445-0220 3,855 See Attachments See Attachments
TOTAL
3,855
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
Planned Events Exceeding 1 Hour OR > 5,000 mcf
See Attachments
TOTAL 0
See Attachments
Page 9
9/15/2014
4:46 PM
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events> 1 Hour
3,855
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
14,030
Assist
0
TOTAL FLARED VOLUME
17,885
See Attachments
Page 9
9/15/2014
4:46 PM
FlareStartDate 08/01/2014
Flare End Date 08/31/2014
GC3 Flare Report Total Volume (MSCF) 3855
Report
Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
14-290 Flare Relief 08/07/2014 2:45:00 pm 12:00:00 am 555 min No No No BP1\MOORDV 3083
Determination Cause Wet Gas compressor shutdown because of control/instrumentation failure associated with a faulty electrical relay.
Action Taken WOA reduced production rates and shut-in wells. Wells were shut-in or choked back
14-291 Flare Relief 08/08/2014 12:00:00 am 2:20:00 am 140 min No No No BPIWOORDV 772
Determination Cause Wet Gas compressor shutdown because of controlliinstrumentation failure associated with a faulty electrical relay.
Action Taken WOA reduced production rates and shut-in wells. Wells were shut-in or choked back
Total Volume (MSCF) 3855
Generated 09/09/2014 1:36:11PM Page 10 of 10
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj
Sent: Sunday, August 10, 2014 11:00 AM
To: Hunt, Jennifer L (DOA)
Cc: Roby, David S (DOA); Ferguson, Victoria L (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; Kruger, Dale O; AK, OPS GC3&PCC OSM; AK, OPS GC3 Facility & Field
OTL; AK, OPS GC1 OSM; AK, OPS GC1 Facility OTL
Subject: Flaring Events at GC3 and GC1
To: Jennifer Hunt, AOGCC CC'. Dave Roby, AOGCC CC: Victoria Ferguson,
AOGCC
iennifer huntCc alaska.00v dave robvna.alaska.00v
victoria ferousonCa7alaska.00v
From: Wendy Hiester, GPB Production Optimization Team Leader
GC3:
A flaring event occurred at GC3 starting at 08/07/2014 14:45 and stopping at 08/08/2014 02:20 with a volume
of 3855 (MSCF). The event lasted for 695 minutes and was due to a Wet Gas compressor shutdown because of
control/instrumentation failure associated with a faulty electrical relay. To stop the flaring, wells were shut in or
choked back.
GC1:
A flaring event occurred at GCI starting at 08/04/2014 15:40 and stopping at 08/04/2014 18:05 with a volume
of 250 (MSCF). The event lasted for 145 minutes. GC1 Flared off of V-136 IP Gas Scrubber when K-108 IP
Compressor lost forward flow. Flaring stopped when K-108 resumed forward flow.
A flaring event occurred at GC1 starting at 08/02/2014 15:20 and stopping at 08/02/2014 19:15 with a volume
of 370 (MSCF). The event lasted for 235 minutes. GCI Flared while swapping K-105 and K-106 LP
compressors. Flaring stopped when K-106 was stabilized.
A flaring event occurred at GC 1 starting at 08/01/2014 08:00 and stopping at 08/01/2014 18:00 with a volume
of 20 (MSCF). The event lasted for 600 minutes. 8/1 GC1 Flared off of V -120A LP Gas K.O. Drum because of
fluctuating LP gas rates. The flaring stopped once gas rate was stabilized.
A flaring event occurred at GCI starting at 07/31/2014 00:01 and stopping at 07/31/2014 23:59 with a volume
of 370 (MSCF). The event lasted for 1438 minutes. 7/31 GC1 Flaring off of V-136 because K-107 IP
Compressor loss forward flow. Flaring was stopped once forward flow was re-established through K-107.
Please let me know if you have any questions.
Wendy Hiester (alt. Kellie Okonek)
PCC/EOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 227-7144 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)
e-mail akor)spcceoctl@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000033
2. Facility Name
PBU GC 3
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
September -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
14,073
11. Assist Gas
0
12. Fuel gas used in lease operations.
433,684
13. Other (see instructions)
0
Official Use Only
Authorization >t hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
447,757
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
Commissioner Dale
18. Transferred to: (Express as a negative #) CGF
-24,619,466
19. Remarks:
I hereby certify that the oregoing is true and correct to the best of my knowledge.
/J/�/)
Signature !/t' r l,c Title Manager Production Taxes and Royalties Alaska
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.
Printed Name Diane Colley/ Phone (907) 564-5775 Date � 94
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Hunt, Jennifer L (DOA
From: AK, OPS PCC EOC TL ]AKOPSPCCEOCTL@bp.com]
Sent: Sunday, October 19, 2014 8:59 AM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur,
Gregory; AK, HSSEE Env Adv West; Kruger, Dale O; Hauger, Wayne A; Burgess, David H;
AK, HSSEE Env Adv East; Loader, Neil; AK, OPS FS3 Facility OTL; AK, OPS FS3 OSM; AK,
OPS GC3 Facility & Field OTL; AK, OPS GC3&PCC OSM; AK, OPS PCC EOC TL
Subject: Gas flaring events at GC3, FS3
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
]ennifer.hunt(malaska.gov dave robv(@alaska.gov victoria ferguson(a)alaska.gov
From: Kellie Okonek, GPB Production Optimization Team Leader
A flaring event occurred at GC3 starting at 10/18/2014 14:13 and stopping at 10/18/2014 23:40 with a volume of 1260
(MSCF). The event lasted for 567 minutes, and was due to spin cooling of K-7001 LPS compressor for water washing and
planned maintenance.
A flaring event occurred at GC3 starting at 10/17/2014 15:30 and stopping at 10/17/2014 16:58 with a volume of 56833
(MSCF). The event lasted for 88 minutes. The event had a volume greater than 5000 (MSCF), and was due to
depressurization of X -pad for planned maintenance.
A flaring event occurred at GC3 starting at 10/16/2014 16:00 and stopping at 10/16/2014 22:58 with a volume of 1140
(MSCF). The event was a black smoke event. The event lasted for 418 minutes, and was due to spin cooling of K-7000
LPS compressor for water wash.
A flaring event occurred at FS3 starting at 10/15/2014 15:02 and stopping at 10/15/2014 16:32 with a volume of 415
(MSCF). The event lasted for 90 minutes, and was due to 1802 STV/IP turbine shutdown due to IP.21 control issues.
Flaring stopped when machine re -started.
Please let me know if you have any questions.
Kellie Okonek
PCC/EOC Production Optimization TL
Office: (907) 659-4472
Cell: (907) 382-1370
akopspcceoctl@ bp.com
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.comj
Sent: Friday, October 24, 2014 8:05 AM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur,
Gregory; AK, HSSEE Env Adv West; Kruger, Dale O; Hauger, Wayne A; AK, OPS PCC EOC
TL; AK, OPS GC3 Facility & Field OTL; AK, OPS GC3&PCC OSM; AK, OPS GC1 Facility
OTL; AK, OPS GC1 OSM K, OPS CGF OTL; AK, OPS CCP CGF OSM
Subject: Gas flaring events affiNOWC1, CGF
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC
Jennifer hunt5alaska.00v dave robvCo-alaska.00v victoria ferouson(5alaska oov
From: Kellie Okonek, GPB Production Optimization Team Leader
A flaring event occurred at GC3 starting at 10/24/2014 05:27 and stopping at 10/24/2014 19:55 with a volume of 6542
(MSCF). The event lasted for 868 minutes. The event had a volume greater than 5000 (MSCF), and was due to planned
s/d of B-pad/HP production and an unplanned s/d of K-5500 wet gas compressor. Flaring slowed when depressurization
was completed, but continued as K-5500 troubleshooting progressed.
A flaring event occurred at GCI starting at 10/23/2014 07:51 and stopping at 10/23/2014 20:51 with a volume of 1030
(MSCF). The event lasted for 780 minutes, and was due to s/d and depressure of K-3300 GLT compressor.
A flaring event occurred at CGF starting at 10/19/2014 13:40 and stopping at 10/19/2014 23:59 with a volume of 99321
(MSCF). The event lasted for 619 minutes. The event had a volume greater than 5000 (MSCF), and was due to MI
compressor s/d to accommodate safe lifting operations. Flaring stopped when the MI compressor was re -started.
Please let me know if you have any questions.
Kellie Okonek
PCC/EOC Production Optimization TL
Office: (907) 659-4472
Cell: (907) 382-1370
akopspcceoctl@bo.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
DECEIVED
NOV 18 2014
:-,,OGCiC
1. Facility Number
0290000033
2. Facility Name
PBU GC 3
3. Field
PBU - WOA
4. Operator
IBP
5. Month/Year of Disposition
I October -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
65,775
10. Pilot and Purge
13,284
11. Assist Gas
0
12. Fuel gas used in lease operations.
477,366
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr.
Safety
05 ��-�-
MCF
14. TOTAL VOLUME (ITEMS 6.12)
556,425
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
Commissioner Dale
18. Transferred to: (Express as a negative #) CGF
-22,380,378
19. Remarks:
I hereby certify that the f9irgoing it; true and pomect to the best of my knowledge.
Signature bm Title Mana er Production Taxes and Royalties Alaska
'j
Printed Name Diane ColleyPhone (907) 564-5775 Date I1 / q
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Events less than or equal to 1 hour
TOTAL 0
BP EXPLORATION (ALASKA) INC.
a 14 V a.. F e
PRUDHOE BAY UNIT - GC -3
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME
GAS FLARING INCIDENT REPORT
NOV
18 ze"e 9
October 2014
56,833
10/18/2014 1413-2340
1,260
®n
C
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events> 1 Hour
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr
Not required for unplanned events <=1 hr
DATE TIME VOLUME DESCRIPTION OF IN,
10/24/2014 0527-1955 6,542 See Attachments
TOTAL 6,542
Planned Events Less Than or Eaual 1 Hour AND <= 5,000 mcf
& CAUSE
See Attachments
See Attachments
See Attachments
CAUSE
TOTAL
0
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
10/16/2014 1600-2258
1,140 See Attachments See Attachments
10/17/2014 1530-1658
56,833
10/18/2014 1413-2340
1,260
TOTAL
59,233
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events> 1 Hour
6,542
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
59,233
exceeding 5,000 MCF
Pilot Purge
13,284
Assist
0
TOTAL FLARED VOLUME
79,059
11/13/2014
2:39 PM
Flare Start Date 10/01/2014
Flare End Date 10/312014
GC3 Flare Report
Total Volume (MSCF) 65775
Report
Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
14-425 Flare Relief 10/16/2014 4:00:00 pm 10:58:00 pm 418 min Yes Yes Yes BPI\LORFA3 1140
Determination Cause spin cool GT -7000 for maintenance work and occasional flaring due to plant rate increase (A pad coming online) Black smoke occured during
first 30 minutes due to PV -611 opening to 30" bum pit on initial gas surge and not reseating properly. Valve should not have opened at
pressures registered on header and required research to discover cause of black smoke and reseal the valve.
Action Taken Cool down complete and plant stabilized. Action taken to stop Black smoke required checking Rupture Disk, when we discovered it was
_ -- _--. -intact we moved -to'PV-614..-Thoughitappeared4o beclosed ithad-notreseated-properly_-Weopened-PV-6t}antl-reclosedit.Valve
---
resealed property and Black smoke event ended.
14-425 Flare Relief 10/17/2014 3:30:00 pm 4:58:00 pm 88 min No No Yes BPIUGHNSOM 56833
Determination Cause Flared while de -pressuring X -pad for planned repair work
Action Taken Stopped flaring when X -pad de -pressured and safe out for work.
14-429 Flare Relief 10/18/2014 2:13:00 pm 11:40:00 pm 567 min Yes No Yes BPI\LORFA3 1260
Determination Cause Spin cool and re -start of GT -7001 for maintenance work.
Action Taken work completed.
14-440 Flare Relief 10/24/2014 5:27:00 am 7:55:00 pm 868 min Yes No No BPI\MARTINJt bb4L
Determination Cause #1 shut down HP production and "B" Pad shut down and depressure.
#2 K-5500 shut down.
Action Taken #1 B wellpad and HP line depressurization completed.
-- - -
#2 Flaring was -permitted -to�oonttnuewhile GC- operetionspersonnelattemptedto restart the -equipment; K-5500:- 5 of restarts attempted
and equipment was re -started at 19:55 hrs..
Total Volume (MSCF) 65775
DECEIVE
NOV 18 2014
AOGCC
Generated 11/17/2014 9:25:27AM Page 10 of 10
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
[)EC 16 2014
A0GCG
1. Facility Number
0290000033
2. Facility Name
PBU GC 3
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
November -2014
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
13,714
11. Assist Gas
0
12. Fuel gas used in lease operations.
489,138
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
502,852
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
Commissioner Date
18. Transferred to: (Express as a negative # CGF
( p 9 )
-23,244,842
19. Remarks:
I hereby certify that the Aregoing is true antl correct to the best of my knowledge.
Note: All volumes must be corrected
Signature W / µ Title Mana er Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date / AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit m Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Fal 2CE; VED
JAN 16 2015
AOGCC
1. Facility Number2.
0290000033
Facility Name
PBU GC 3
3. Field
PBU - WOA
4. Operator
IBP
5. MonthNear of Disposition
I December -2014
Disposition
Volume MCF
20. Forpmduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
1,023
10. Pilot and Purge
17,270
11. Assist Gas
0
12. Fuel gas used in lease operations.
515,353
13. Other (see instructions)
U
Official Use OnlyAuthorization
>1 hr:
Safety
J
I o2 3
MCF
14. TOTAL VOLUME (ITEMS 6.12)
533,646
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
/
Commissioner Dale
18. Transferred to: (Express as a negative #) CGF
-23,533,643
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
/,/�� �Annn //�'�/1/�����/
Signature eJ(GI/1 e Ca I - Title Mana er Production Taxes and Ro alties Alaska
Note: All volumes must be corrected
to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
AAC25.235.
ii �—
Printed Name Diane Colley Phone (907) 564-5775 Date
(rTL
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -3
GAS FLARING INCIDENT REPORT
December 2014
JAN 16 2015
Unplanned Events less than or equal to 1 hour 1
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 0
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
12/8/2014 0532-1210 1,023 See Attachments See Attachments
TOTAL 1,023
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
Planned Events Exceeding 1 Hour OR > 5,000 mcf _ 1
See Attachments
TOTAL
0
TOTAL
Unplanned Events < I Hour
0
Unplanned Events> 1 Hour
1,023
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events> 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
17,270
Assist
0
TOTAL FLARED VOLUME
18,293
See Attachments
Page 8
1/14/2015
10:49 AM
Flare StartDate 12/01/2014
Flare End Date 12/31/2014
Report
Numbs System
rjE ED
GC3 Flare Report Zvi 2015
P Total Volume (MSCF) 7023
Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
14-504 Flare Relief 12/08/2014 5:32:00 am 12:10:00 pm 398 min No No No or i1arnuv
Determination Cause `Net Gas compressor shutdown because of control instrumentation failure associated with a faulty instrumentation.
Action Taken Flaring was permitted to continue while GC operations personnel attempted to restart the equipment. 2 restarts attempted at 11:00 hM,
-4"04� Daily Volume (MSCF) 1023
Total Volume (MSCF) 7023
Page 8 of 8
Generated 01/08/2015 9:27:01AM
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Wednesday, December 10, 2014 6:20 PM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, HSSEE Env Adv West; Hauger, Wayne A; AK, OPS GCI OSM; AK,
OPS GC1 Facility OTL; AK, OPS GC2 OSM; AK, OPS GC2 Facility OTL; AK, OPS GC3&PCC
OSM; AK, OPS GC3 Facility & Field OTL
Subject: Flaring Events at GC1, GC2, ander
Categories: Attention
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson,
AOGCC
iennifer.hunt(d)alaska.00v dave.robvCawlalaska.gov victoria.ferousonaalask
a.aov
From: Wendy Hiester, Production Optimization Team Leader
A flaring event occurred at GC3 starting at 12/08/2014 05:32 and stopping at 12/08/2014 12:10 with a volume
of 1023 (MSCF). The event lasted for 398 minutes and occurred when the Wet Gas compressor shutdown
because of control/instrumentation failure associated with a faulty instrumentation. Flaring was permitted to
continue while GC operations personnel attempted to restart the equipment. Flaring stopped when the
compressor was restarted successfully.
A flaring event occurred at GC2 starting at 12/05/2014 14:32 and stopping at 12/05/2014 17:26 with a volume
of 1088 (MSCF). The event lasted for 174 minutes and occurred when the IP compressor was shut down
because of a problem associated with re -start of production following plant shutdown. Flaring was permitted to
continue while GC operations personnel attempted to restart the equipment. Flaring stopped when the
compressor was restarted successfully.
A flaring event occurred at GC I starting at 12/05/2014 14:30 and stopping at 12/05/2014 23:00 with a volume
of 5050 (MSCF). The event lasted for 510 minutes. The event had a volume greater than 5000 (MSCF) and
occurred when GC2 shut down causing the LP/IP compressors to lose flow. Flaring stopped when GC2 started
flowing oil to GCI and gas rate increased so that forward flow was reestablished in the LP/IP machines.
Please let me know if you have any questions,
Wendy Hiester (alt. Kellie Okonek)
PCC/EOC Production Optimization TL
external: (907) 659 4472 (BOC) / 5566 (PBOC)
cell: (907) 227-7144 Harmony: 758 4404
Pager 574 (WOA - access # 4236) or 1890 (EOA - access #5100)