Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutPBU Lisburne Prod (GPMA) Gas DispositionState of Alaska AOGCC
Gas Disposition Files
Year: 2014
Facility: PBU Lisburne Prod (GPMA)
Operator: BP EXPLORATION (ALASKA)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number2.
0290000009
Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. MonthNear of Disposition
January -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
105,262
Pool Name Pool Code Percent
7. Reinjected
10,864,585
Lisburne 640144 29.2%
Niakuk 640148 0.7%
8. Flared or vented 1 hour or less
0
North Prudhoe Bay State 640152 0.0%
Sadlerochit 640150 12.9%
9. Flared or vented more than 1 hour (see instr.)
0
Point McIntyre 640180 56.6%
Ivishak-SagRiver test in 640147 0.7%
10. Pilotand Purge
11,541
West Beach 640186 0.0%
11. Assist Gas
161,449
12, Fuel gas used in lease operations.
842,154
13. Other (see instructions)
354,016
Official Use Only
Authorization>1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
12,339,007
Lease Use
MCF
15. NGL Gas Equivalent
105,262
Conservation
MCF
16. Purchased gas
0
Waste
MCF
17. Transferred from:
1,438,560
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe= 1,438,550 and Fuel Gas from Prudhoe= to
I hereby certify thaatjh�e,,foregoin is true and correct to the best of my knowledge.
/ V%{/ I Note: All volumes must be corrected
Signature ee..i�ttww Title -Manager Production Taxes and Royllties Alaska to pressure of 14.65 psis and to a
J temperature of 60o F. Authority 20
Printed Name Diana ColleyPhone (907) 564-5775 Date / AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. Mon[h/Vear of Disposition
February -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
98,229
Pool Name PoolCode Percent
7. Reinjected
9,492,212
Lisburne 640144 48.4%
Niakuk 640148 0.5%
8. Flared or vented 1 hour or less
0
North Prudhoe Bay State 640152 0.0%
Sadlerochit 640150 3.7%
9. Flared or vented more than 1 hour (see insh.)
0
Point McIntyre 640180 46.7%
vishak-SagRiver test in 640147 0.7%
10. Pilot and Purge
10,419
West Beach 640186 0.0%
11. Assist Gas
153,518
12. Fuel gas used in lease operations.
765,018
13. Other (see instructions)
215,843
Official Use Only
Authorization 11 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
10,735,239
Lease Use
MCF
15. NGL Gas Equivalent
98,229
Conservation
MCF
16. Purchased gas
0
Waste-
MCF
17. Transferred from
867,503
Commissioner Date
18. Transferred to: (Express as a negative #)0
19, Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 866,347 and Fuel Gas from Prudhoe = 1,156
I hereby certify that t e foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
L J
Printed Name Diane Colleytemperature of 60o F. Authority 20 Phone (907) 564-5775 Date 2 / / AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number2.
0290000009
Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. MonthNear of Disposition
I March -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
106,728
Pool Name Pool Code Percent
7. Reinjected
10,363,576
Lisburne 640144 47.0%
Niakuk 640148 0.5%
8. Flared or vented 1 hour or less
0
North Prudhoe Bay State 640152 0.0%
Sadlerochit 640150 3.9%
9. Flared or vented more than 1 hour (see instr.)
0
Point McIntyre 640180 48.1%
Ivishak-SagRiver test in 640147 0.6%
10. Pilot and Purge
11,481
West Beach 640186 0.0%
11. Assist Gas
171,490
12. Fuel gas used in lease operations.
875,370
13. Other (see instructions)
20,716
Official Use Only
Authorization >I hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
11,549,361
Lease Use
MCF
15. NGL Gas Equivalent
106,728
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
809,603
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 809,574 and Fuel Gas from Prudhoe = 29
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
���� Note: All volumes must be corrected
Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date J AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. Month/Year of Disposition
Aril -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
97,421
Pool Name Pool Code Percent
7. Reinjected
9,333,576
Lisburne 640144 44.8%
Niakuk 640148 0.5%
8. Flared or vented 1 hour or less
0
North Prudhoe Bay State 640152 0.0%
Sadlerochit 640150 2.9%
9. Flared or vented more than 1 hour (see instr.)
0
Point McIntyre 640180 51.2%
Ivishak-SagRiver test in 640147 0.7%
10. Pilot and Purge
11,062
West Beach 640186 0.0%
11. Assist Gas
175,731
12. Fuel gas used in lease operations.
807,239
13. Other (see instructions)
60,482
Official Use Only
Authorization >l hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
10,485,511
Lease Use
MCF
15. NGL Gas Equivalent
97,421
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
1,074,831
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,062,334 and Fuel Gas from Prudhoe = 12,497
1 hereby certify that the
� foregoing is true and correct to the best of my knov4edge.
1/ J / iINote: Alf volumes must be corrected
Signature_ leu M t G(Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
temperature of 6Oo F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
IPBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. Month/Year of Disposition
I May -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a gement of
Total Volume.
6. Sold
95,217
Pool Name Pool Code Percent
7. Reinjected
9,467,774
Lisbume 640144 34.9%
Niakuk 640148 0.6%
8. Flared or vented 1 hour or less
322
North Prudhoe Bay State 640152 0.0%
Sadlerochit 640150 2.1%
9. Flared or vented more than 1 hour (see instr.)
0
Point McIntyre 640180 61.80%
Ivishalk-Saa River test in 640147 0.7%
10. Pilot and Purge
11,398
West Beach 640186 0.0%
11. Assist Gas
180,081
12. Fuel gas used in lease operations.
803,326
13. Other (see instructions)
236,416
Official Use Only
A
Authorization hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 8-12)
10,794,534
Lease Use
MCF
15. NGL Gas Equivalent
95,217
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from:
1,144,570
Commissioner Date
18. Transferred to: (Express as a negative #)
O
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,144,561 and Fuel Gas from Prudhoe = 9
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Cli�ini✓ Note: All volumes must be corrected
Signature °°<�.++�X-- Title Mana er Production Taxes and Ro aloes Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. MonthlYear of Disposition
June -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
24,300
Pool Name Pool Code Percent
7. Reinjected
3,721,119
Lisburne 640144 21.3%
Niakuk 640148 0.1%
8. Flared or vented 1 hour or less
554
North Prudhoe Bay State 640152 0.0%
Sadlerochit 640150 5.1%
9. Flared or vented more than 1 hour (see instr.)
24,886
Point McIntyre 640180 73.4%
Ivishak-SagRiver test in 640147 0.1%
10. Pilot and Purge
11,092
West Beach 640186 0.0%
11. Assist Gas
112,522
12. Fuel gas used in lease operations.
268,215
13. Other (see instructions)
109,449
Oficial Use Only
Authorization >1 hr.
Safety
2-` v$tP
MCF
14. TOTAL VOLUME (ITEMS 6-12)
4,272,137
Lease Use
MCF
15. NGL Gas Equivalent
24,300
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
1,221,713
/J
I Com issioner Date
18. Transferred to: (Express as a negative #)
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,161,522 and Fuel Gas from Prudhoe = 60,191
1 hereby certify that a foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Mana er Production Taxes and Ro alties Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date AAC25.235.
vL-F
IF/79//9-
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Total flare <=1 Hour 182
6/14/2014 2037-2400 1,838
6/15/2014 0001-1730 7,087
Total Flare> 1 Hour
8,925
Volume Flared
BP EXPLORATION ALASKA, INC,
Measured Safety Pilot
5,072
Continuous Assist
19,426
TOTAL FLARED
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun -14
VOLUME
PLANNED
DATE
TIME
(MSCF)
DESCRIPTION OF INCIDENTS & CAUSE
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
6/3/2014
0237-0242
23
Not required for unplanned events <= 1 hour
Planned
Not required for unplanned events <= 1 hour
6/3/2014
0844-0845
1
Not required for unplanned events <= 1 hour
Unplanned
Not required for unplanned events <= 1 hour
6/3/2014
0950-0952
2
Not required for unplanned events <=1 hour
Unplanned
Not required for unplanned events <= 1 hour
6/3/2014
1230-1231
1
Not required for unplanned events <=1 hour
Unplanned
Not required for unplanned events <= 1 hour
6/3/2014
1457-1458
1
Not required for unplanned events <=1 hour
Unplanned
Not required for unplanned events <= 1 hour
6/3/2014
1646-1648
1
Not required for unplanned events <=1 hour
Unplanned
Not required for unplanned events <= 1 hour
6/14/2014
0815-0816
1
Not required for unplanned events <=1 hour
Planned
Not required for unplanned events <=1 hour
6/27/2014
0847-0850
91
Not required for unplanned events <= 1 hour
Planned
Not required for unplanned events <= 1 hour
6/28/2014
1858-1903
60
Not required for unplanned events <= 1 hour
Unplanned
Not required for unplanned events <=1 hour
6/29/2014
0211-0216
1
Not required for unplanned events <= 1 hour
Unplanned
Not required for unplanned events <=1 hour
6/29/2014
0347-0348
0
Not required for unplanned events <=1 hour
Unplanned
Not required for unplanned events <= 1 hour
Total flare <=1 Hour 182
6/14/2014 2037-2400 1,838
6/15/2014 0001-1730 7,087
Total Flare> 1 Hour
8,925
Volume Flared
9,107
Measured Safety Pilot
5,072
Continuous Assist
19,426
TOTAL FLARED
33,605
1808 Reinjection compressor shutdown in preparation for full p Planned 1808 depressurized and shut down.
Depressurize RGI line and common linethrough LPC Planned Production flowline depressured
SP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
Total Flare <=1 Hour 316
6/14/2014 2037-2400 11,501
6/15/2014 0001-1730 482
Total Flare>1 Hour
11,983
Volume Flared
PRUDHOE BAY, POINT MCINTYRE
Measured Safety Pilot
4,603
Continuous Assist
87,181
TOTAL FLARED
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun -14
VOLUME
PLANNED
DATE
TIME
(MSCF)
DESCRIPTION OF INCIDENTS&CAUSE
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
6/3/2014
0237-0242
245
Not required for unplanned events <= 1 hour
Planned
Not required for unplanned events <= I hour
6/3/2014
0844-0845
6
Not required for unplanned events <= 1 hour
Unplanned
Not required for unplanned events <= 1 hour
6/3/2014
0950-0952
23
Not required for unplanned events <= 1 hour
Unplanned
Not required for unplanned events <= 1 hour
6/3/2014
1230-1231
14
Not required for unplanned events <= 1 hour
Unplanned
Not required for unplanned events <= 1 hour
6/3/2014
1457-1458
5
Not required for unplanned events <= 1 hour
Unplanned
Not required for unplanned events <= 1 hour
6/3/2014
1646-1648
8
Not required for unplanned events <= 1 hour
Unplanned
Not required for unplanned events <= 1 hour
6/14/2014
0815-0816
5
Not required for unplanned events <= 1 hour
Planned
Not required for unplanned events <= 1 hour
6/27/2014
0847-0850
6
Not required for unplanned events <= 1 hour
Planned
Not required for unplanned events <= 1 hour
6/28/2014
1858-1903
4
Not required for unplanned events <= 1 hour
Unplanned
Not required for unplanned events <= 1 hour
6/29/2014
0211-0216
0
Not required for unplanned events <=1 hour
Unplanned
Not required for unplanned events <=1 hour
6/29/2014
0347-0348
0
Not required for unplanned events <= 1 hour
Unplanned
Not required for unplanned events <= 1 hour
Total Flare <=1 Hour 316
6/14/2014 2037-2400 11,501
6/15/2014 0001-1730 482
Total Flare>1 Hour
11,983
Volume Flared
12,299
Measured Safety Pilot
4,603
Continuous Assist
87,181
TOTAL FLARED
104,083
1808 Reinjection compressor shutdown in preparation forfull Planned 1808 depressurized and shut down.
Depressurize RGI line and common linethrough LPC Planned Production flowline depressured
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun -14
DATE
TIME
VOLUME
(Mscf)
DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
6/3/2014
0237-0242
0
Not required for unplanned events <= 1 hour
Planned
Not required for unplanned events <= 1 hour
6/3/2014
0844-0845
0
Not required for unplanned events <= 1 hour
Unplanned
Not required for unplanned events <= 1 hour
6/3/2014
0950-0952
0
Not required for unplanned events <= 1 hour
Unplanned
Not required for unplanned events <= 1 hour
6/3/2014
1230-1231
0
Not required for unplanned events <=1 hour
Unplanned
Not required for unplanned events <=1 hour
6/3/2014
1457-1458
0
Not required for unplanned events <=1 hour
Unplanned
Not required for unplanned events <= 1 hour
6/3/2014
1646-1648
0
Not required for unplanned events <= 1 hour
Unplanned
Not required for unplanned events <= 1 hour
6/14/2014
0815-0816
0
Not required for unplanned events <= 1 hour
Planned
Not required for unplanned events <= 1 hour
6/27/2014
0847-0850
0
Not required for unplanned events <= 1 hour
Planned
Not required for unplanned events <= 1 hour
6/28/2014
1858-1903
0
Not required for unplanned events <= 1 hour
Unplanned
Not required for unplanned events <= 1 hour
6/29/2014
0211-0216
0
Not required for unplanned events <= 1 hour
Unplanned
Not required for unplanned events <= 1 hour
6/29/2014
0347-0348
0
Not required for unplanned events <=1 hour
Unplanned
Not required for unplanned events <=1 hour
Total Flow <=1 Hour 0
6/14/2014 2037-2400
6/15/2014 0001-1730
Total Flom> 1 Hour
0
Volume Flared
0
Measured Safety Pilot
4
Continuous Assist
53
TOTAL FLARED
57
1808 Reinjection compressor shutdown in preparation for full Planned 1808 depressurized and shut down.
Depressurize RGI line and common linethrough LPC Planned Production flowline depressured
Total Fiore <=1 Hour 0
6/14/2014 2037-2400
6/15/2014 0001-1730
Total Fiore, 1 Hour
Volume Flared
Measured Safety Pilot
4
Continuous Assist
BP EXPLORATION ALASKA, INC,
TOTAL FLARED
63
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun -14
VOLUME
PLANNED
DATE
TIME
fMscff
DESCRIPTION OF INCIDENTS & CAUSE
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
6/3/2014
0237-0242
0
Not required for unplanned events <= 1 hour
Planned
Not required for unplanned events <=1 hour
6/3/2014
0844-0845
0
Not required for unplanned events <= 1 hour
Unplanned
Not required for unplanned events <= 1 hour
6/3/2014
0950-0952
0
Not required for unplanned events <= 1 hour
Unplanned
Not required for unplanned events <= 1 hour
6/3/2014
1230-1231
0
Not required for unplanned events <=1 hour
Unplanned
Not required for unplanned events <=l hour
6/3/2014
1457-1458
0
Not required for unplanned events <= 1 hour
Unplanned
Not required for unplanned events <=1 hour
6/3/2014
1646-1648
0
Not required for unplanned events <= 1 hour
Unplanned
Not required for unplanned events <= 1 hour
6/14/2014
0815-0816
0
Not required for unplanned events <= 1 hour
Planned
Not required for unplanned events <= 1 hour
6/27/2014
0847-0850
0
Not required for unplanned events <= 1 hour
Planned
Not required for unplanned events <=1 hour
6/28/2014
1858-1903
0
Not required for unplanned events <= 1 hour
Unplanned
Not required for unplanned events <= 1 hour
6/29/2014
0211-0216
0
Not required for unplanned events <= 1 hour
Unplanned
Not required for unplanned events <= 1 hour
6/29/2014
0347-0348
0
Not required for unplanned events <=1 hour
Unplanned
Not required for unplanned events <= 1 hour
Total Fiore <=1 Hour 0
6/14/2014 2037-2400
6/15/2014 0001-1730
Total Fiore, 1 Hour
Volume Flared
Measured Safety Pilot
4
Continuous Assist
59
TOTAL FLARED
63
1808 Reinjection compressor shutdown in preparation for full Planned 1808 depressurized and shut down.
Depressurize RGI line and common linethrough LPC Planned Production flowline depressured
Total Flare <=1 Hour 56
6/14/2014 2037-2400 1,986
6/15/2014 0001-1730 1,991
Total Flcre> 1 Hour
3,977
Volume Flared
BP EXPLORATION ALASKA, INC,
Measured Safety Pilot
1,410
Continuous Assist
5,803
TOTAL FLARED
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun -14
VOLUME
PLANNED
DATE
TIME
(Mscf)
DESCRIPTION OF INCIDENTS & CAUSE
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
6/3/2014
0237-0242
30
Not required for unplanned events <= 1 hour
Planned
Not required for unplanned events <=1 hour
6/3/2014
0844-0845
0
Not required for unplanned events <=1 hour
Unplanned
Not required for unplanned events <=1 hour
6/3/2014
0950-0952
1
Not required for unplanned events <= 1 hour
Unplanned
Not required for unplanned events <= 1 hour
6/3/2014
1230-1231
1
Not required for unplanned events <=l hour
Unplanned
Not required for unplanned events <=l hour
6/3/2014
1457-1458
0
Not required for unplanned events <= 1 hour
Unplanned
Not required for unplanned events <=1 hour
6/3/2014
1646-1648
0
Not required for unplanned events <= 1 hour
Unplanned
Not required for unplanned events <=1 hour
6/14/2014
0815-0816
1
Not required for unplanned events <= 1 hour
Planned
Not required for unplanned events <= 1 hour
6/27/2014
0847-0850
26
Not required for unplanned events <=1 hour
Planned
Not required for unplanned events <= 1 hour
6/28/2014
1858-1903
17
Not required for unplanned events <=1 hour
Unplanned
Not required for unplanned events <= 1 hour
6/29/2014
0211-0216
0
Not required for unplanned events <= 1 hour
Unplanned
Not required for unplanned events <= 1 hour
6/29/2014
0347-0348
0
Not required for unplanned events <= 1 hour
Unplanned
Not required for unplanned events <=1 hour
Total Flare <=1 Hour 56
6/14/2014 2037-2400 1,986
6/15/2014 0001-1730 1,991
Total Flcre> 1 Hour
3,977
Volume Flared
4,033
Measured Safety Pilot
1,410
Continuous Assist
5,803
TOTAL FLARED
11,246
1808 Reinjection compressor shutdown in preparation for full p Planned 1808 depressurized and shut down.
Depressurize RGI line and common linethrough LPC Planned Production flowline depressured
Total Flom <=1 Hour 0
6/14/2014 2037-2400
6/15/2014 0001-1730
Total Flom> 1 Hour
0
Volume Flared
BP EXPLORATION ALASKA, INC,
Measured Safety Pilot
0
Continuous Assist
0
TOTAL FLARED
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun -14
VOLUME
PLANNED
DATE
TIME
(MSCF(
DESCRIPTION OF INCIDENTS & CAUSE
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
6/3/2014
0237-0242
0
Not required for unplanned events <=1 hour
Planned
Not required for unplanned events <=1 hour
6/3/2014
0844-0845
0
Not required for unplanned events <= 1 hour
Unplanned
Not required for unplanned events <=1 hour
6/3/2014
0950-0952
0
Not required for unplanned events <= 1 hour
Unplanned
Not required for unplanned events <= 1 hour
6/3/2014
1230-1231
0
Not required for unplanned events <= 1 hour
Unplanned
Not required for unplanned events <=1 hour
6/3/2014
1457-1458
0
Not required for unplanned events <= 1 hour
Unplanned
Not required for unplanned events <= 1 hour
6/3/2014
1646-1648
0
Not required for unplanned events <= 1 hour
Unplanned
Not required for unplanned events <= 1 hour
6/14/2014
0815-0816
0
Not required for unplanned events <=l hour
Planned
Not required for unplanned events <=1 hour
6/27/2014
0847-0850
0
Not required for unplanned events <=1 hour
Planned
Not required for unplanned events <= 1 hour
6/28/2014
1858-1903
0
Not required for unplanned events <= 1 hour
Unplanned
Not required for unplanned events <= 1 hour
6/29/2014
0211-0216
0
Not required for unplanned events <=1 hour
Unplanned
Not required for unplanned events <=1 hour
6/29/2014
0347-0348
0
Not required for unplanned events <= 1 hour
Unplanned
Not required for unplanned events <= 1 hour
Total Flom <=1 Hour 0
6/14/2014 2037-2400
6/15/2014 0001-1730
Total Flom> 1 Hour
0
Volume Flared
0
Measured Safety Pilot
0
Continuous Assist
0
TOTAL FLARED
0
1808 Reinjection compressor shutdown in preparation for full Planned 1808 depressurized and shut down.
Depressurize RGI line and common linethrough LPC Planned Production flowline depressured
Total Flom <=1 Hour 0
6/14/2014 2037-2400
6/15/2014 0001-1730
Total Flom> 1 Hour
0
Volume Flared
BP EXPLORATION ALASKA, INC,
Measured Safety Pilot
0
Continuous Assist
0
TOTALFLARED
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun -14
VOLUME
PLANNED
DATE
TIME
)MSCF)
DESCRIPTION OF INCIDENTS &CAUSE
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
6/3/2014
0237-0242
0
Not required for unplanned events <= 1 hour
Planned
Not required for unplanned events <= 1 hour
6/3/2014
0844-0845
0
Not required for unplanned events <=1 hour
Unplanned
Not required for unplanned events <= 1 hour
6/3/2014
0950-0952
0
Not required for unplanned events <= 1 hour
Unplanned
Not required for unplanned events <=1 hour
6/3/2014
1230-1231
0
Not required for unplanned events <= 1 hour
Unplanned
Not required for unplanned events <= 1 hour
6/3/2014
1457-1458
0
Not required for unplanned events <= 1 hour
Unplanned
Not required for unplanned events <=1 hour
6/3/2014
1646-1648
0
Not required for unplanned events <= 1 hour
Unplanned
Not required for unplanned events <= 1 hour
6/14/2014
0815-0816
0
Not required for unplanned events <=1 hour
Planned
Not required for unplanned events <= 1 hour
6/27/2014
0847-0850
0
Not required for unplanned events <= 1 hour
Planned
Not required for unplanned events <= 1 hour
6/28/2014
1858-1903
0
Not required for unplanned events <=1 hour
Unplanned
Not required for unplanned events <=l hour
6/29/2014
0211-0216
0
Not required for unplanned events <= 1 hour
Unplanned
Not required for unplanned events <=1 hour
6/29/2014
0347-0348
0
Not required for unplanned events <=l hour
Unplanned
Not required for unplanned events <=l hour
Total Flom <=1 Hour 0
6/14/2014 2037-2400
6/15/2014 0001-1730
Total Flom> 1 Hour
0
Volume Flared
0
Measured Safety Pilot
0
Continuous Assist
0
TOTALFLARED
0
1808 Reinjection compressor shutdown in preparation for full Planned 1808 depressurized and shut down.
Depressurize RGI line and common linethrough LPC Planned Production flowline depressured
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. MonthNear of Disposition
I July -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
41,064
Pool Name PoolCode Percent
7. Reinjected
9,602,038
Lisburne 640144 41.2%
Niakuk 640148 0.4%
6. Flared or vented 1 hour or less
755
North Prudhoe Bay State 640152 0.0%
Sadlerochit 640150 4.8%
9. Flared or vented more than 1 hour (see instr.)
0
Point McIntyre 640180 53.1%
Ivishak-SagRiver test in 640147 0.5%
10. Pilot and Purge
11,490
West Beach 640186 1 0.0%
11. Assist Gas
155,807
12. Fuel gas used in lease operations.
757,655
13. Other (see instructions)
167,668
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
10,736,477
Lease Use
MCF
15. NGL Gas Equivalent
41,064
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
605,524
Commissioner Date
16. Transferred to: (Express as a negative #)
0
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 605,524 and Fuel Gas from Prudhoe = 0
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
bv�uN//�'���//I���////���� ote: All volumes must be corrected
Signature WN Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. Monthffear of Disposition
August -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
75,341
Pool Name Pool Code Percent
7. Reinjected
9,002,505
Lisburne 640144 38.3%
Niakuk 640148 0.5%
8. Flared or vented 1 hour or less
0
North Prudhoe Ba State 640152 0.0%
Sadlerochit 640150 4.1%
9. Flared or vented more than 1 hour (see insh.)
0
Point McIntyre 640180 56.4%
Ivishak-SagRiver test in 640147 0.8%
10. Pilot and Purge
11,539
West Beach 640186 0.0%
11. Assist Gas
157,140
12. Fuel gas used in lease operations.
805,218
13. Other (see instructions)
3,396
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
10,055,139
Lease Use
MCF
15. NGL Gas Equivalent
75,341
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
278,254
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 13: Lift Gas Off Field; Block l7: MI from Prudhoe = 213,400 and Fuel Gas from Prudhoe = 64,854
1 hereby certify that th foregoing is true
,�and
dccorrect to the best of my knowledge.
/l/In71 / '/ / ,& Note: All volumes must be corrected
Signature W �V it Ac (� Title Mana er Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a
// /, temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. MonthNear of Disposition
September -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
86,198
Pool Name Pool Code Percent
7. Reinjected
9,165,485
Lisburne 640144 U.N.
Niakuk 640148 0.5%
8. Flared or vented 1 hour or less
0
North Prudhoe Bay State 640152 0.0%
Sadlerochit 640150 0.0%
9. Flared or vented more than 1 hour (see instr.)
0
Point McIntyre 640180 61.0%
Ivishak-SagRiver test in 640147 0.6%
10. Pilot and Purge
11,176
West Beach 640186 0.0%
11. Assist Gas
160,791
12. Fuel gas used in lease operations.
771,748
13. Other (see instructions)
811
Official Use Only
Authorization>1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
10,196,209
Lease Use
MCF
15. NGL Gas Equivalent
86,198
Conservation
MCF
16. Purchased gas
Q
Waste:
MCF
17. Transferred from:
0
18. Transferred to: (Express as a negative #)
Q
Commissioner Date
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 0 and Fuel Gas from Prudhoe = 0
1 hereby certify that the foregoing is true and correct to the best of my knoviledge.
/,//���,�y /n Note: All volumes must be corrected
Signature _ a/ ZI �! / , �� Title Manager Production Taxes and Royalties Alaska t0 pressure of 14.65 psis and to a
/� / / / temperature of 60o F. Authority 20
Printed Name Diane Colley( Phone (907) 564-5775 Date `f AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. MonthNear of Disposition
October -2014
Disposition
Volume MCF
20. For production (mm multiple pools, list mnhibution of each pool as a percent of
Total Volume.
6. Sold
22,891
Pool Name Pool Code Percent
7. Reinjected
3,874,880
Lisburne 640144 14.8%
Niakuk 640148 0.1%
8. Flared or vented 1 hour or less
2,462
North Prudhoe Bay State 640152 0.0%
Sadlerochit 640150 8.7%
9. Flared or vented more than 1 hour (see instr.)
9 383
Point McIntyre 640180 76.2%
11 ishak-SagRiver test in 640147 0.3%
10. Pilot and Purge
41,012
West Beach 640186 0.0%
11. Assist Gas
95,499
12. Fuel gas used in lease operations.
300,029
13. Other (see instructions)
25,290
Official Use Only
Authorization >7 hr:
Safety
9383
J
MCF
14. TOTAL VOLUME (ITEMS 6-72)
4,371,446
Lease Use
MCF
15. NGL Gas Equivalent
22,891
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
Transferred from:
84,829
2_/S117.
1-2-1,5--
Commissioner Date
18.
8. Transferred to: (Express as a negative #)
0
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 0 and Fuel Gas from Prudhoe = 84,829
1 hereby certify that a foregoing is true and correct to the best of my knowledge.
/� /t�1 Note: All volumes must be corrected
Signature_ a 1 Lf Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
1 i / temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date /1 14 AAC25.235.
vri—
l2/r4 l t+
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
DATE
TIME
VOLUME
JMSCFJ
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct -14
DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
10/6/2014
2109-2209
133
Depressured 24 common -line.
Y
Production fiowiine depressured to 200 psi
10/7/2014
0205-0241
104
Depressured 24 common -line.
Y
Depressured East side fuel gas and East side c
10/7/2014
2028-0253
44
Shutdown of 1808 compressorfor Maint.
Y
Flare valve closed after depressure of 1808 cc
10/8/2014
0113-0119
1
Blowdown of the case on 1808 compressor for Maint.
Y
Flare valve closed after 1808 case at zero.
10/13/2014
2029-2033
72
1807 Shutdown for RGI sleeve repair
Y
1807 T/C depressurization complete
10/27/2014
1807-1808
10
1801 STV/IP: Attempeted to start after plant shutdown.
N
Start failed. Reassessing startup monitoring fit
10/28/2014
0438-0456
11
1801 STV/IP shutdown on low suction pressure
N
Secure 1801 STV/IP and prepare for restart
10/28/2014
0459-0521
20
Process Upset due to Fluid slug entering plant
N
Adjusted plant Process as needed to resolve a
Total Flare c=1 Hour
395
10/13/2014
2132-0000
1,412
Depressured 24 common -line.
Y
RGI depressured to 560 PSI
10/14/2014
0000-1216
5,170
Depressured RGI line
Y
RGI depressured to 560 PSI
10/28/2014
0053-0435
0
Process upset while starting plant
N
adjusted process as needed
Total Flare > I Hour 6,582
Volume Flared 6,977
Measured Safety Pilot 6,719
Continuous Assist 14,236
TOTAL FLARED 27,932
DATE
TIME
VOLUME
(MSCF)
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct -14
DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
10/6/2014
2109-2209
813
Depressured 24 common -line.
y
Production flowline depressured to 200 psi
10/7/2014
0205-0241
479
Depressured 24 common -line.
y
Depressured East side fuel gas and East side e
10/7/2014
2028-0253
206
Shutdown of 1808 compressor for Maint.
y
Flare valve closed after depressure of 1808 co
10/8/2014
0113-0119
6
Blowdown of the case on 1808 compressor for Maint.
y
Flare valve closed after 1808 case at zero.
10/13/2014
2029-2033
32
1807 Shutdown for RGI sleeve repair
y
1807 T/C depressurization complete
10/27/2014
1807-1808
39
18015TV/IP: Attempeted to start after plant shutdown.
N
Start failed. Reassessing startup monitoring fl:
10/28/2014
0438-0456
99
18015TV/IP shutdown on low suction pressure
N
Secure 1801 STV/IP and prepare for restart
10/28/2014
0459-0521
184
Process Upset due to Flluid slug entering plant
N
Adjusted plant process as needed to resolve a
Total Flare <=1 Hour
1,858
10/13/2014
2132-0000
635
Depressured 24 common -line.
y
RGI depressured to 560 PSI
10/14/2014
0000-1216
0
Depressured RGI line
y
RGI depressured to S60 PSI
10/28/14
0053-0435
4
Process upset while starting plant
N
adjusted process as needed
Total Flom > 1 Hour
639
Volume Flared
2,497
Measured Safety Pilot
32,285
Continuous Assist
69,705
TOTAL FLARED
104,487
SP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct -14
PLANNED
VOLUME
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
TIME
(M
DESCRIPTION OF INCIDENTS &CAUSE
DATE
Production flowld depressured to 200 Psi
10/6/2014 2109-2209
0
De ressured 24 common -line.
P
y
y
Depressured East side fuel gas and East side common line
Eas si
10/7/2014 0205-0241
0
Depressured 24 common -line.
y
Flare valve closed after depressure of 1808 compressor.
10/7/2014 2028-0253
0
Shutdown of 1808 compressor for Maint.
y
Flare valve closed after 1808 case at zero.
10/8/2014 0113-0119
0
Blowdown of the case on 1808 compressor for Maint.
V
1807 T/C depressurization complete
10/13/2014 2029-2033
110
1807 Shutdown for RGI sleeve repair
to start after plant shutdown.
Start failed. Reassessing startup monitoring flare valves.
for
10/27/2014 1807-1808
16
1801 STV/IP: Attempeted
STV/IP shutdown on low suction pressure
N
Secure 18015TV/IP and prepare restart
as needed to resolve abnormally h
10/28/2014 0438-0456
27
1801
Upset due to Fluid slug entering plant
N
Adjusted plant process
10/28/2014 0459-0521
50
Process
Total Flare <- 3 Hour
203
y
ftGl depressured to 560 P51
10/13/2014 2132-0000
2,161
Depressured 24 common -line.
y
RGI depressured to 560 PSI
10/14/2014 0000-1216
0
Depressured RGI line
N
adjusted process as needed
10/28/2014 0053-0435
1
Process upset while starting plant
Total Flare > 1 Hour
2,162
Volume Flared
2,365
Measured Safety Pilot
1,991
Continuous Assist
11,296
TOTALFLARED
15,652
Total Flare <=1 Hour 6
10/13/2014 2132-0000 0 Depressured 24 common -line. Y RGI depressured to S60 PSI
10/14/2014 0000.1216 0 Depressured RGI line Y RGI depressured to 560 PSI
10/28/2014 0053-0435 0 Process upset while starting plant N adjusted process as needed
Total Flare > I Hour
0
Volume Flared
SP EXPLORATION ALASKA, INC,
Measured Safety Pilot
13
Continuous Assist
202
TOTALFLARFO
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct -14
DATE
TIME
VOLUME
(MscQ
DESCRIPTION OF INCIDENTS &CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
10/6/2014
2109-2209
6
Depressured 24 common -line.
Y
Production flowline depressured to 200 psi
Depressured East side fuel gas and East side c
10/7/2014
0205-0241
0
Depressured 24 common -line.
V
Y
Flare valve closed after depressure of 1808 cc
10/7/2014
2028-0253
0
Shutdown of 1808 compressor for Maint.
the case on 1808 compressor for Maint.
Y
Flare valve closed after 1808 case at zero.
10/8/2014
0113-0119
0
Blowdown of
Y
1807 TIC depressurization complete
10/13/2014
2029-2033
0
1807 Shutdown for RGI sleeve repair
N
Start failed. Reassessing startup monitoring fl.
10/27/2014
1807-1808
0
1801 STV/IP: Attempeted to start after plant shutdown.
Secure 1801 STV/IP and prepare for restart
10/28/2014
D438-0456
0
1801 STV/IP shutdown on low suction pressure
N
N
Adjusted plant process as needed to resolve a
10/28/2014
0459-0521
0
Process Upset due to Flluid slug entering plant
Total Flare <=1 Hour 6
10/13/2014 2132-0000 0 Depressured 24 common -line. Y RGI depressured to S60 PSI
10/14/2014 0000.1216 0 Depressured RGI line Y RGI depressured to 560 PSI
10/28/2014 0053-0435 0 Process upset while starting plant N adjusted process as needed
Total Flare > I Hour
0
Volume Flared
6
Measured Safety Pilot
13
Continuous Assist
202
TOTALFLARFO
221
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct -14
VOLUME PLANNED
O
DATE TIME (UM DESCRIPTION OFINCIDENTS &CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
10/06/14
2109-2209
Depressured 24 common -line.
10/07/14
0205-0241
Depressured 24 common -line.
10/07/14
2028-0253
Shutdown of 1808 compressor for Maint.
10/08/14
0113-0119
Blowdown of the case on 1808 compressor for Maint.
10/13/14
2029-2033
1807 Shutdown for RGI sleeve repair
10/27/14
1807-1808
1801 STV/IP: Attempeted to start after plant shutdown.
10/28/14
0438-0456
1801 STV/IP shutdown on low suction pressure
10/28/14
0459-0521
Process Upset due to Flluid slug entering plant
Total Flare <=1 Hour 0
10/13/14 2132-0000 Depressured 24 common -line.
10/14/14 0000-1216 Depressured RGI line
10/28/14 0053-0435 Process upset while starting plant
Total Flare > 1 Hour 0
Volume Flared
0
Measured Safety Pilot
0
Continuous Assist
0
TOTALFLARED
0
Production flawline depressured to 200 psi
Depressured East side fuel gas and East side c
Flare valve closed after depressure of 1808 cc
Flare valve closed after 1808 case at zero.
1807 T/C depressurization complete
Start failed. Reassessing startup monitoring fl:
Secure 1801 STOP and prepare for restart
Adjusted plant process as needed to resolve a
RGI depressured to 560 PSI
RGI depressured to 560 PSI
adjusted process as needed
Total Flare > 1 Hour
U
Volume Flared
SP EXPLORATION ALASKA, INC,
Measured Safety Pilot
0
Continuous Assist
0
TOTALFLARED
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct -14
VOLUME
PLANNED
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
DATE
TIME
MSCF
DESCRIPTION OF INCIDENTS &CAUSE
Y
Production depressured to 200 psi
10/06/14
2109-2209
0
Depressured 24 common -line.
Y
DepressuEast side fuel gas and East side c-
redd Eas
10/07/14
10/07/14
0205-0241
0
Depressured 24 common -line.
y
Flare valve closed after depressure of 1808 co
10/07/14
2028-0253
0
Shutdown of 1808 compressor for Maint.
y
Flare valve closed after 1808 case at zero.
10/08/14
0113-0119
0
Blowdown of the case on 1808 compressor for Maint.
1807 T/C depressurization complete
10/13/14
2029-2033
0
1807 Shutdown for RGI sleeve repair
Y
Start failed. Reassessing startup monitoring fl;
10/27/14
1807-1808
0
1801 STV/IP: Attempeted to start after plant shutdown.
N
Secure 1801 STOP and prepare for restart
10/28/14
0438-0456
0
1801 STV/IP shutdown on low suction pressure
N
Adjusted plant process as needed to resolve a
10/28/14
0459-0521
0
Process Upset due to Flluid slug entering plant
Total Flare <=1 Hour
0
y
RGI depressured to 560 PSI
10/13/14
2132-0000
0
Depressured 24 common -line.
y
RGI depressured to 560 Psi
10/14/14
0000-1216
0
Depressured RGI line
N
adjusted process as needed
10/28/14
0053-0435
0
Process upset while starting plant
Total Flare > 1 Hour
U
Volume Flared
0
Measured Safety Pilot
0
Continuous Assist
0
TOTALFLARED
0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct -14
Total Flare <-1 Hour U
10/13/2014 2132-0000 0 Depressured 24 common -line.
10/14/2014 0000-1216 0 Depressured RGI line
10/28/2014 0053-0435 0 Process upset while starting plant
Total Flare>I Hour 0
Volume Flared
0
Measured Safety Pilot
4
PLANNED
60
TOTALFLARED
64
VOLUME
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
TIME
Ms
DESCRIPTION OF INCIDENTS & CAUSE
DATE
y
Production flowline depressured to 200 psi
10/6/2014
2109-2209
0
Depressured 24 common -line.
Y
Depressured East side fuel gas and East side c
10/7/2014
0205-0241
0
24 common -line.
Y
Flare valve closed after depressure of 1808 cc
10/7/2014
2028-0253
0
ShutdownDepressuredo
Shutdown of 1808 compressor for
Flare valve closed after 1808 case at zero.
10/8/2014
0113-0119
0
pressnt.
of the case on 1808 compressor for Maint.
Y
1807 T/C depressurization complete
10/13/2014
2029-2033
0
1807 Shutdown for RGI sleeve repair
1807 Shutdown
N
Start failed. Reassessing startup monitoring ft
10/27/2014
1807-1808
0
1801 SN/IP: to start after plant shutdown.
N
Secure 1801 SN/IP and prepare for restart
10/28/2014
0438-0456
0
1801 SN/IP shutdown on low suction pressure
shutdown o
N
Adjusted plant process as needed to resolve a
10/28/2014
0459-0521
0
Process Upset due to Flluid slug entering plant
Total Flare <-1 Hour U
10/13/2014 2132-0000 0 Depressured 24 common -line.
10/14/2014 0000-1216 0 Depressured RGI line
10/28/2014 0053-0435 0 Process upset while starting plant
Total Flare>I Hour 0
Volume Flared
0
Measured Safety Pilot
4
Continuous Assist
60
TOTALFLARED
64
RGI depressured to 560 PSI
RGI depressured to 560 PSI
adjusted process as needed
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. MonthNear of Disposition
November -2014
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent o/
Total Volume.
6. Sold
73,572
Pool Name Pool Code Percent
7. Reinjected
8,703,656
Lisburne 640144 15.8%
Niakuk 640148 0.0%
8. Flared or vented 1 hour or less
676
North Prudhoe Bay State 640152 0.0%
Sadlerochit 640150 15.1%
9. Flared or vented more than 1 hour (see instr.)
0
Point McIntyre 640180 69.1%
Ivishak-SagRiver test in 640147 0.0%
10. Pilot and Purge
11,089
West Beach 640186 0.0%
11. Assist Gas
162,177
12. Fuel gas used in lease operations.
738,584
13. Other (see instructions)
18,558
Official Use Only
Authorization>1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
9,708,312
Lease Use
MCF
15. NGL Gas Equivalent
73,572
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
706,936
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 706,851 and Fuel Gas from Prudhoe = 85
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
&d" D� Note: All volumes must corrected
Signature Tige Mana er Production Taxes and Ro aloes Alaska to pressure of 14.65 psiss and to a
temperature of 60o F. Authority 20
Printed Name Diane Coll e Phone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
RECEIVED
JAN 16 2015
AOGCC
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator 5. MonthNear of Disposition
BP I December -2014
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of Total
Volume.
6. Sold
78,183
Pool Name Pool Code Percent
7. Reinjected
10,794,011
Lisburne 640144 22.2%
Niakuk 640148 0.2%
8. Flared or vented 1 hour or less
0
North Prudhoe Bay State 640152 0.0%
Sadlerochit 640150 9.2%
9. Flared or vented more than 1 hour (see instr.)
15,440
Point McIntyre 640180 67.7%
Ivishak-SagRiver test in GPMA 640147 0.7/0
10. Pilot and Purge
11,417
West Beach 1 640186 1 0.0%
11. Assist Gas
171,801
12. Fuel gas used in lease operations.
821,355
13. Other (see instructions)
149,293
Oficial Use Only
Authorization >7 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
12,041,500
Lease Use
MCF
15. NGL Gas Equivalent
78,183
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
860,071
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19 Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 859,855 and Fuel Gas from Prudhoe = 216
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
V1
eC
Signature rt tIC Title Manager Production Taxes and Ro a1Nes Alaska
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.
Printed Name Diane Colley Phone (907) 564-5775 Date l /� /
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
DATE TIME
12/18/2014 1325-1335
VOLUME
A
Total Flare <= 1 Hour 0
12/1/2014 0154-0847 1,196
12/27/2014 1221-1335 1,265
Total Flare> 1 Hour
2,461
Volume Flared
2,461
Measured Safety Pilot
2,520
Continuous Assist
37,698
TOTALFLARED
42,679
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec -14
DESCRIPTION OF INCIDENTS & CAUSE
Not required for unplanned events <= 1 hour
1807 Reinjection compressor shutdown because of
control/instrumentation failure associated with WHRU
Louvre control failure and subsequent attempted restarts.
1808 Reinjection compressor shutdown because of
control/instrumentation failure associated with C2
Compressor fl2 Axial. Black smoke lasted approximately 8
minutes.
-IVED
JAN 16 2015
AOGVx/C
PLANNED
UNPLANNED ACTION TAKEN TO
N Not required for unplanned events <= 1 hour
1807 was depressurized, repaired and
N restarted.
Completed troubleshooting, reloaded 1808
T/C, and stabilized facility process and
N operation.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec -14
RECEIVED
,IAN 16 2015
OGCC
Total Flare <=1 Hour 0
12/1/2014 0154-0847 7,703
12/27/2014 1221-1335 3,398
Total Flare> 1 Hour 11,101
Volume Flared 11,101
Measured Safety Pilot
VOLUME
Continuous Assist
PLANNED
DATE
TIME (MSCF)
DESCRIPTION OF INCIDENTS & CAUSE
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
12/18/2014
1325-1335 0
Not required for unplanned events <= 1 hour
N Not required for unplanned events <= 1 hour
Total Flare <=1 Hour 0
12/1/2014 0154-0847 7,703
12/27/2014 1221-1335 3,398
Total Flare> 1 Hour 11,101
Volume Flared 11,101
Measured Safety Pilot
7,737
Continuous Assist
116,575
TOTAL FLARED
135,413
1807 Reinjection compressor shutdown because of
control/instrumentation failure associated with WHRU
Louvre control failure and subsequent attempted restarts. N
1808 Reinjection compressor shutdown because of
control/instrumentation failure associated with C2
Compressor #2 Axial. Black smoke lasted approximately 8
minutes. N
1807 was depressurized, repaired and
restarted.
Completed troubleshooting, reloaded 1808
T/C, and stabilized facility process and
operation.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec -14
RECEIVED
JAN 16 2015
4,OGCC
Total Flare <=1 Hour 0
12/1/2014 0154-0847 22
12/27/2014 1221-1335 15
Total Flare > 1 Hour 37
Volume Flared 37
Measured Safety Pilot 26
Continuous Assist 392
TOTAL FLARED 455
1807 Reinjection compressor shutdown because of
control/instrumentation failure associated with WHRU
Louvre control failure and subsequent attempted restarts. N
1808 Reinjection compressor shutdown because of
control/instrumentation failure associated with C2
Compressor N2 Axial. Black smoke lasted approximately 8
minutes. N
1807 was depressurized, repaired and
restarted.
Completed troubleshooting, reloaded 1808
T/C, and stabilized facility process and
operation.
VOLUME
PLANNED
DATE
TIME (Mscf(
DESCRIPTION OF INCIDENTS & CAUSE
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
12/18/2014
1325-1335 0
Not required for unplanned events <= 1 hour
N Not required for unplanned events <= 1 hour
Total Flare <=1 Hour 0
12/1/2014 0154-0847 22
12/27/2014 1221-1335 15
Total Flare > 1 Hour 37
Volume Flared 37
Measured Safety Pilot 26
Continuous Assist 392
TOTAL FLARED 455
1807 Reinjection compressor shutdown because of
control/instrumentation failure associated with WHRU
Louvre control failure and subsequent attempted restarts. N
1808 Reinjection compressor shutdown because of
control/instrumentation failure associated with C2
Compressor N2 Axial. Black smoke lasted approximately 8
minutes. N
1807 was depressurized, repaired and
restarted.
Completed troubleshooting, reloaded 1808
T/C, and stabilized facility process and
operation.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec -14
DATE
TIME
VOLUME
(Mscf)
DESCRIPTION OF INCIDENTS & CAUSE
12/18/2014
1325-1335
0
Not required for unplanned events <= 1 hour
Total Flare <= 1 Hour 0
12/1/2014 0154-0847 0
12/27/2014 1221-1335 51
Total Flare> 1 Hour
51
Volume Flared
51
Measured Safety Pilot
80
Continuous Assist
1,187
TOTALFLARED
1,318
ECEIVE®
JAN 16 // Z00(1�o5
Ofl
� OGCC
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
N Not required for unplanned events <= 1 hour
1807 Reinjection compressor shutdown because of
control/instrumentation failure associated with WHRU
Louvre control failure and subsequent attempted restarts. N
1808 Reinjection compressor shutdown because of
control/instrumentation failure associated with C2
Compressor N2 Axial. Black smoke lasted approximately 8
minutes. N
1807 was depressurized, repaired and
restarted.
Completed troubleshooting, reloaded 1808
T/C, and stabilized facility process and
operation.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec -14
Total Flare <= 1 Hour 0
12/1/2014 0154-0847 1,326
12/27/2014 1221-1335 464
Total Flare> 1 Hour
1,790
VOLUME
1,790
PLANNED
1,054
DATE
TIME
(Mscf)
DESCRIPTION OF INCIDENTS & CAUSE
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
12/18/2014
1325-1335
0
Not required for unplanned events <= 1 hour
N
Not required for unplanned events <= 1 hour
Total Flare <= 1 Hour 0
12/1/2014 0154-0847 1,326
12/27/2014 1221-1335 464
Total Flare> 1 Hour
1,790
Volume Flared
1,790
Measured Safety Pilot
1,054
Continuous Assist
15,949
TOTAL FLARED
18,793
1807 Reinjection compressor shutdown because of
control/instrumentation failure associated with WHRU
Louvre control failure and subsequent attempted restarts. N
1808 Reinjection compressor shutdown because of
control/instrumentation failure associated with C2
Compressor #2 Axial. Black smoke lasted approximately 8
minutes. N
1807 was depressurized, repaired and
restarted.
Completed troubleshooting, reloaded 1808
T/C, and stabilized facility process and
operation.
yy,IIAN 16 //''112015
Y OGCC
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec -14
RECEIVED
JAN 16 2015
Total Flare <= 1 Hour 0
12/01/14 0154-0847 0
12/27/14 1221-1335 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot
VOLUME
Continuous Assist
PLANNED
DATE
TIME (MSCF)
DESCRIPTION OF INCIDENTS & CAUSE
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
12/18/14
1325-1335
Not required for unplanned events <= 1 hour
N Not required for unplanned events <= 1 how
Total Flare <= 1 Hour 0
12/01/14 0154-0847 0
12/27/14 1221-1335 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot
0
Continuous Assist
0
TOTALFLARED
0
1807 Reinjection compressor shutdown because of
control/instrumentation failure associated with WHRU
Louvre control failure and subsequent attempted restarts. N
1808 Reinjection compressor shutdown because of
control/instrumentation failure associated with C2
Compressor #2 Axial. Black smoke lasted approximately 8
minutes. N
1807 was depressurized, repaired and
restarted.
Completed troubleshooting, reloaded 1808
T/C, and stabilized facility process and
operation.
A®GCC
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec -14
RECEIVE®
JAN 16 2015
A0(71C%C
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
12/18/14 1325-1335 0 Not required for unplanned events <= 1 hour N Not required for unplanned events <= 1 how
Total Flare <=1 Hour 0
12/01/14 0154-0847 0
12/27/14 1221-1335 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot
0
Continuous Assist
0
TOTAL FLARED
0
1807 Reinjection compressor shutdown because of
control/instrumentation failure associated with WHRU
Louvre control failure and subsequent attempted restarts. N
1808 Reinjection compressor shutdown because of
control/instrumentation failure associated with C2
Compressor P2 Axial. Black smoke lasted approximately 8
minutes. N
1807 was depressurized, repaired and
restarted.
Completed troubleshooting, reloaded 1808
T/C, and stabilized facility process and
operation.