Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPBU Lisburne Prod (GPMA) Gas DispositionState of Alaska AOGCC Gas Disposition Files Year: 2014 Facility: PBU Lisburne Prod (GPMA) Operator: BP EXPLORATION (ALASKA) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number2. 0290000009 Facility Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator BP 5. MonthNear of Disposition January -2014 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 105,262 Pool Name Pool Code Percent 7. Reinjected 10,864,585 Lisburne 640144 29.2% Niakuk 640148 0.7% 8. Flared or vented 1 hour or less 0 North Prudhoe Bay State 640152 0.0% Sadlerochit 640150 12.9% 9. Flared or vented more than 1 hour (see instr.) 0 Point McIntyre 640180 56.6% Ivishak-SagRiver test in 640147 0.7% 10. Pilotand Purge 11,541 West Beach 640186 0.0% 11. Assist Gas 161,449 12, Fuel gas used in lease operations. 842,154 13. Other (see instructions) 354,016 Official Use Only Authorization>1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6.12) 12,339,007 Lease Use MCF 15. NGL Gas Equivalent 105,262 Conservation MCF 16. Purchased gas 0 Waste MCF 17. Transferred from: 1,438,560 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe= 1,438,550 and Fuel Gas from Prudhoe= to I hereby certify thaatjh�e,,foregoin is true and correct to the best of my knowledge. / V%{/ I Note: All volumes must be corrected Signature ee..i�ttww Title -Manager Production Taxes and Royllties Alaska to pressure of 14.65 psis and to a J temperature of 60o F. Authority 20 Printed Name Diana ColleyPhone (907) 564-5775 Date / AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator BP 5. Mon[h/Vear of Disposition February -2014 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 98,229 Pool Name PoolCode Percent 7. Reinjected 9,492,212 Lisburne 640144 48.4% Niakuk 640148 0.5% 8. Flared or vented 1 hour or less 0 North Prudhoe Bay State 640152 0.0% Sadlerochit 640150 3.7% 9. Flared or vented more than 1 hour (see insh.) 0 Point McIntyre 640180 46.7% vishak-SagRiver test in 640147 0.7% 10. Pilot and Purge 10,419 West Beach 640186 0.0% 11. Assist Gas 153,518 12. Fuel gas used in lease operations. 765,018 13. Other (see instructions) 215,843 Official Use Only Authorization 11 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 10,735,239 Lease Use MCF 15. NGL Gas Equivalent 98,229 Conservation MCF 16. Purchased gas 0 Waste- MCF 17. Transferred from 867,503 Commissioner Date 18. Transferred to: (Express as a negative #)0 19, Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 866,347 and Fuel Gas from Prudhoe = 1,156 I hereby certify that t e foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a L J Printed Name Diane Colleytemperature of 60o F. Authority 20 Phone (907) 564-5775 Date 2 / / AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number2. 0290000009 Facility Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator BP 5. MonthNear of Disposition I March -2014 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 106,728 Pool Name Pool Code Percent 7. Reinjected 10,363,576 Lisburne 640144 47.0% Niakuk 640148 0.5% 8. Flared or vented 1 hour or less 0 North Prudhoe Bay State 640152 0.0% Sadlerochit 640150 3.9% 9. Flared or vented more than 1 hour (see instr.) 0 Point McIntyre 640180 48.1% Ivishak-SagRiver test in 640147 0.6% 10. Pilot and Purge 11,481 West Beach 640186 0.0% 11. Assist Gas 171,490 12. Fuel gas used in lease operations. 875,370 13. Other (see instructions) 20,716 Official Use Only Authorization >I hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 11,549,361 Lease Use MCF 15. NGL Gas Equivalent 106,728 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 809,603 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 809,574 and Fuel Gas from Prudhoe = 29 1 hereby certify that the foregoing is true and correct to the best of my knowledge. ���� Note: All volumes must be corrected Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date J AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator BP 5. Month/Year of Disposition Aril -2014 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 97,421 Pool Name Pool Code Percent 7. Reinjected 9,333,576 Lisburne 640144 44.8% Niakuk 640148 0.5% 8. Flared or vented 1 hour or less 0 North Prudhoe Bay State 640152 0.0% Sadlerochit 640150 2.9% 9. Flared or vented more than 1 hour (see instr.) 0 Point McIntyre 640180 51.2% Ivishak-SagRiver test in 640147 0.7% 10. Pilot and Purge 11,062 West Beach 640186 0.0% 11. Assist Gas 175,731 12. Fuel gas used in lease operations. 807,239 13. Other (see instructions) 60,482 Official Use Only Authorization >l hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 10,485,511 Lease Use MCF 15. NGL Gas Equivalent 97,421 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 1,074,831 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,062,334 and Fuel Gas from Prudhoe = 12,497 1 hereby certify that the � foregoing is true and correct to the best of my knov4edge. 1/ J / iINote: Alf volumes must be corrected Signature_ leu M t G(Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a temperature of 6Oo F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name IPBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator BP 5. Month/Year of Disposition I May -2014 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a gement of Total Volume. 6. Sold 95,217 Pool Name Pool Code Percent 7. Reinjected 9,467,774 Lisbume 640144 34.9% Niakuk 640148 0.6% 8. Flared or vented 1 hour or less 322 North Prudhoe Bay State 640152 0.0% Sadlerochit 640150 2.1% 9. Flared or vented more than 1 hour (see instr.) 0 Point McIntyre 640180 61.80% Ivishalk-Saa River test in 640147 0.7% 10. Pilot and Purge 11,398 West Beach 640186 0.0% 11. Assist Gas 180,081 12. Fuel gas used in lease operations. 803,326 13. Other (see instructions) 236,416 Official Use Only A Authorization hr: Safety MCF 14. TOTAL VOLUME (ITEMS 8-12) 10,794,534 Lease Use MCF 15. NGL Gas Equivalent 95,217 Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: 1,144,570 Commissioner Date 18. Transferred to: (Express as a negative #) O 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,144,561 and Fuel Gas from Prudhoe = 9 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Cli�ini✓ Note: All volumes must be corrected Signature °°<�.++�X-- Title Mana er Production Taxes and Ro aloes Alaska to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator BP 5. MonthlYear of Disposition June -2014 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 24,300 Pool Name Pool Code Percent 7. Reinjected 3,721,119 Lisburne 640144 21.3% Niakuk 640148 0.1% 8. Flared or vented 1 hour or less 554 North Prudhoe Bay State 640152 0.0% Sadlerochit 640150 5.1% 9. Flared or vented more than 1 hour (see instr.) 24,886 Point McIntyre 640180 73.4% Ivishak-SagRiver test in 640147 0.1% 10. Pilot and Purge 11,092 West Beach 640186 0.0% 11. Assist Gas 112,522 12. Fuel gas used in lease operations. 268,215 13. Other (see instructions) 109,449 Oficial Use Only Authorization >1 hr. Safety 2-` v$tP MCF 14. TOTAL VOLUME (ITEMS 6-12) 4,272,137 Lease Use MCF 15. NGL Gas Equivalent 24,300 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 1,221,713 /J I Com issioner Date 18. Transferred to: (Express as a negative #) 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,161,522 and Fuel Gas from Prudhoe = 60,191 1 hereby certify that a foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature Title Mana er Production Taxes and Ro alties Alaska to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date AAC25.235. vL-F IF/79//9- Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate Total flare <=1 Hour 182 6/14/2014 2037-2400 1,838 6/15/2014 0001-1730 7,087 Total Flare> 1 Hour 8,925 Volume Flared BP EXPLORATION ALASKA, INC, Measured Safety Pilot 5,072 Continuous Assist 19,426 TOTAL FLARED CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun -14 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 6/3/2014 0237-0242 23 Not required for unplanned events <= 1 hour Planned Not required for unplanned events <= 1 hour 6/3/2014 0844-0845 1 Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <= 1 hour 6/3/2014 0950-0952 2 Not required for unplanned events <=1 hour Unplanned Not required for unplanned events <= 1 hour 6/3/2014 1230-1231 1 Not required for unplanned events <=1 hour Unplanned Not required for unplanned events <= 1 hour 6/3/2014 1457-1458 1 Not required for unplanned events <=1 hour Unplanned Not required for unplanned events <= 1 hour 6/3/2014 1646-1648 1 Not required for unplanned events <=1 hour Unplanned Not required for unplanned events <= 1 hour 6/14/2014 0815-0816 1 Not required for unplanned events <=1 hour Planned Not required for unplanned events <=1 hour 6/27/2014 0847-0850 91 Not required for unplanned events <= 1 hour Planned Not required for unplanned events <= 1 hour 6/28/2014 1858-1903 60 Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <=1 hour 6/29/2014 0211-0216 1 Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <=1 hour 6/29/2014 0347-0348 0 Not required for unplanned events <=1 hour Unplanned Not required for unplanned events <= 1 hour Total flare <=1 Hour 182 6/14/2014 2037-2400 1,838 6/15/2014 0001-1730 7,087 Total Flare> 1 Hour 8,925 Volume Flared 9,107 Measured Safety Pilot 5,072 Continuous Assist 19,426 TOTAL FLARED 33,605 1808 Reinjection compressor shutdown in preparation for full p Planned 1808 depressurized and shut down. Depressurize RGI line and common linethrough LPC Planned Production flowline depressured SP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 Total Flare <=1 Hour 316 6/14/2014 2037-2400 11,501 6/15/2014 0001-1730 482 Total Flare>1 Hour 11,983 Volume Flared PRUDHOE BAY, POINT MCINTYRE Measured Safety Pilot 4,603 Continuous Assist 87,181 TOTAL FLARED LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun -14 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS&CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 6/3/2014 0237-0242 245 Not required for unplanned events <= 1 hour Planned Not required for unplanned events <= I hour 6/3/2014 0844-0845 6 Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <= 1 hour 6/3/2014 0950-0952 23 Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <= 1 hour 6/3/2014 1230-1231 14 Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <= 1 hour 6/3/2014 1457-1458 5 Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <= 1 hour 6/3/2014 1646-1648 8 Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <= 1 hour 6/14/2014 0815-0816 5 Not required for unplanned events <= 1 hour Planned Not required for unplanned events <= 1 hour 6/27/2014 0847-0850 6 Not required for unplanned events <= 1 hour Planned Not required for unplanned events <= 1 hour 6/28/2014 1858-1903 4 Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <= 1 hour 6/29/2014 0211-0216 0 Not required for unplanned events <=1 hour Unplanned Not required for unplanned events <=1 hour 6/29/2014 0347-0348 0 Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <= 1 hour Total Flare <=1 Hour 316 6/14/2014 2037-2400 11,501 6/15/2014 0001-1730 482 Total Flare>1 Hour 11,983 Volume Flared 12,299 Measured Safety Pilot 4,603 Continuous Assist 87,181 TOTAL FLARED 104,083 1808 Reinjection compressor shutdown in preparation forfull Planned 1808 depressurized and shut down. Depressurize RGI line and common linethrough LPC Planned Production flowline depressured BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun -14 DATE TIME VOLUME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 6/3/2014 0237-0242 0 Not required for unplanned events <= 1 hour Planned Not required for unplanned events <= 1 hour 6/3/2014 0844-0845 0 Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <= 1 hour 6/3/2014 0950-0952 0 Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <= 1 hour 6/3/2014 1230-1231 0 Not required for unplanned events <=1 hour Unplanned Not required for unplanned events <=1 hour 6/3/2014 1457-1458 0 Not required for unplanned events <=1 hour Unplanned Not required for unplanned events <= 1 hour 6/3/2014 1646-1648 0 Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <= 1 hour 6/14/2014 0815-0816 0 Not required for unplanned events <= 1 hour Planned Not required for unplanned events <= 1 hour 6/27/2014 0847-0850 0 Not required for unplanned events <= 1 hour Planned Not required for unplanned events <= 1 hour 6/28/2014 1858-1903 0 Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <= 1 hour 6/29/2014 0211-0216 0 Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <= 1 hour 6/29/2014 0347-0348 0 Not required for unplanned events <=1 hour Unplanned Not required for unplanned events <=1 hour Total Flow <=1 Hour 0 6/14/2014 2037-2400 6/15/2014 0001-1730 Total Flom> 1 Hour 0 Volume Flared 0 Measured Safety Pilot 4 Continuous Assist 53 TOTAL FLARED 57 1808 Reinjection compressor shutdown in preparation for full Planned 1808 depressurized and shut down. Depressurize RGI line and common linethrough LPC Planned Production flowline depressured Total Fiore <=1 Hour 0 6/14/2014 2037-2400 6/15/2014 0001-1730 Total Fiore, 1 Hour Volume Flared Measured Safety Pilot 4 Continuous Assist BP EXPLORATION ALASKA, INC, TOTAL FLARED 63 CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun -14 VOLUME PLANNED DATE TIME fMscff DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 6/3/2014 0237-0242 0 Not required for unplanned events <= 1 hour Planned Not required for unplanned events <=1 hour 6/3/2014 0844-0845 0 Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <= 1 hour 6/3/2014 0950-0952 0 Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <= 1 hour 6/3/2014 1230-1231 0 Not required for unplanned events <=1 hour Unplanned Not required for unplanned events <=l hour 6/3/2014 1457-1458 0 Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <=1 hour 6/3/2014 1646-1648 0 Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <= 1 hour 6/14/2014 0815-0816 0 Not required for unplanned events <= 1 hour Planned Not required for unplanned events <= 1 hour 6/27/2014 0847-0850 0 Not required for unplanned events <= 1 hour Planned Not required for unplanned events <=1 hour 6/28/2014 1858-1903 0 Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <= 1 hour 6/29/2014 0211-0216 0 Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <= 1 hour 6/29/2014 0347-0348 0 Not required for unplanned events <=1 hour Unplanned Not required for unplanned events <= 1 hour Total Fiore <=1 Hour 0 6/14/2014 2037-2400 6/15/2014 0001-1730 Total Fiore, 1 Hour Volume Flared Measured Safety Pilot 4 Continuous Assist 59 TOTAL FLARED 63 1808 Reinjection compressor shutdown in preparation for full Planned 1808 depressurized and shut down. Depressurize RGI line and common linethrough LPC Planned Production flowline depressured Total Flare <=1 Hour 56 6/14/2014 2037-2400 1,986 6/15/2014 0001-1730 1,991 Total Flcre> 1 Hour 3,977 Volume Flared BP EXPLORATION ALASKA, INC, Measured Safety Pilot 1,410 Continuous Assist 5,803 TOTAL FLARED CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun -14 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 6/3/2014 0237-0242 30 Not required for unplanned events <= 1 hour Planned Not required for unplanned events <=1 hour 6/3/2014 0844-0845 0 Not required for unplanned events <=1 hour Unplanned Not required for unplanned events <=1 hour 6/3/2014 0950-0952 1 Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <= 1 hour 6/3/2014 1230-1231 1 Not required for unplanned events <=l hour Unplanned Not required for unplanned events <=l hour 6/3/2014 1457-1458 0 Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <=1 hour 6/3/2014 1646-1648 0 Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <=1 hour 6/14/2014 0815-0816 1 Not required for unplanned events <= 1 hour Planned Not required for unplanned events <= 1 hour 6/27/2014 0847-0850 26 Not required for unplanned events <=1 hour Planned Not required for unplanned events <= 1 hour 6/28/2014 1858-1903 17 Not required for unplanned events <=1 hour Unplanned Not required for unplanned events <= 1 hour 6/29/2014 0211-0216 0 Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <= 1 hour 6/29/2014 0347-0348 0 Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <=1 hour Total Flare <=1 Hour 56 6/14/2014 2037-2400 1,986 6/15/2014 0001-1730 1,991 Total Flcre> 1 Hour 3,977 Volume Flared 4,033 Measured Safety Pilot 1,410 Continuous Assist 5,803 TOTAL FLARED 11,246 1808 Reinjection compressor shutdown in preparation for full p Planned 1808 depressurized and shut down. Depressurize RGI line and common linethrough LPC Planned Production flowline depressured Total Flom <=1 Hour 0 6/14/2014 2037-2400 6/15/2014 0001-1730 Total Flom> 1 Hour 0 Volume Flared BP EXPLORATION ALASKA, INC, Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun -14 VOLUME PLANNED DATE TIME (MSCF( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 6/3/2014 0237-0242 0 Not required for unplanned events <=1 hour Planned Not required for unplanned events <=1 hour 6/3/2014 0844-0845 0 Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <=1 hour 6/3/2014 0950-0952 0 Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <= 1 hour 6/3/2014 1230-1231 0 Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <=1 hour 6/3/2014 1457-1458 0 Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <= 1 hour 6/3/2014 1646-1648 0 Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <= 1 hour 6/14/2014 0815-0816 0 Not required for unplanned events <=l hour Planned Not required for unplanned events <=1 hour 6/27/2014 0847-0850 0 Not required for unplanned events <=1 hour Planned Not required for unplanned events <= 1 hour 6/28/2014 1858-1903 0 Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <= 1 hour 6/29/2014 0211-0216 0 Not required for unplanned events <=1 hour Unplanned Not required for unplanned events <=1 hour 6/29/2014 0347-0348 0 Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <= 1 hour Total Flom <=1 Hour 0 6/14/2014 2037-2400 6/15/2014 0001-1730 Total Flom> 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 1808 Reinjection compressor shutdown in preparation for full Planned 1808 depressurized and shut down. Depressurize RGI line and common linethrough LPC Planned Production flowline depressured Total Flom <=1 Hour 0 6/14/2014 2037-2400 6/15/2014 0001-1730 Total Flom> 1 Hour 0 Volume Flared BP EXPLORATION ALASKA, INC, Measured Safety Pilot 0 Continuous Assist 0 TOTALFLARED CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun -14 VOLUME PLANNED DATE TIME )MSCF) DESCRIPTION OF INCIDENTS &CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 6/3/2014 0237-0242 0 Not required for unplanned events <= 1 hour Planned Not required for unplanned events <= 1 hour 6/3/2014 0844-0845 0 Not required for unplanned events <=1 hour Unplanned Not required for unplanned events <= 1 hour 6/3/2014 0950-0952 0 Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <=1 hour 6/3/2014 1230-1231 0 Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <= 1 hour 6/3/2014 1457-1458 0 Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <=1 hour 6/3/2014 1646-1648 0 Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <= 1 hour 6/14/2014 0815-0816 0 Not required for unplanned events <=1 hour Planned Not required for unplanned events <= 1 hour 6/27/2014 0847-0850 0 Not required for unplanned events <= 1 hour Planned Not required for unplanned events <= 1 hour 6/28/2014 1858-1903 0 Not required for unplanned events <=1 hour Unplanned Not required for unplanned events <=l hour 6/29/2014 0211-0216 0 Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <=1 hour 6/29/2014 0347-0348 0 Not required for unplanned events <=l hour Unplanned Not required for unplanned events <=l hour Total Flom <=1 Hour 0 6/14/2014 2037-2400 6/15/2014 0001-1730 Total Flom> 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTALFLARED 0 1808 Reinjection compressor shutdown in preparation for full Planned 1808 depressurized and shut down. Depressurize RGI line and common linethrough LPC Planned Production flowline depressured STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator BP 5. MonthNear of Disposition I July -2014 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 41,064 Pool Name PoolCode Percent 7. Reinjected 9,602,038 Lisburne 640144 41.2% Niakuk 640148 0.4% 6. Flared or vented 1 hour or less 755 North Prudhoe Bay State 640152 0.0% Sadlerochit 640150 4.8% 9. Flared or vented more than 1 hour (see instr.) 0 Point McIntyre 640180 53.1% Ivishak-SagRiver test in 640147 0.5% 10. Pilot and Purge 11,490 West Beach 640186 1 0.0% 11. Assist Gas 155,807 12. Fuel gas used in lease operations. 757,655 13. Other (see instructions) 167,668 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 10,736,477 Lease Use MCF 15. NGL Gas Equivalent 41,064 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 605,524 Commissioner Date 16. Transferred to: (Express as a negative #) 0 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 605,524 and Fuel Gas from Prudhoe = 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. bv�uN//�'���//I���////���� ote: All volumes must be corrected Signature WN Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator BP 5. Monthffear of Disposition August -2014 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 75,341 Pool Name Pool Code Percent 7. Reinjected 9,002,505 Lisburne 640144 38.3% Niakuk 640148 0.5% 8. Flared or vented 1 hour or less 0 North Prudhoe Ba State 640152 0.0% Sadlerochit 640150 4.1% 9. Flared or vented more than 1 hour (see insh.) 0 Point McIntyre 640180 56.4% Ivishak-SagRiver test in 640147 0.8% 10. Pilot and Purge 11,539 West Beach 640186 0.0% 11. Assist Gas 157,140 12. Fuel gas used in lease operations. 805,218 13. Other (see instructions) 3,396 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 10,055,139 Lease Use MCF 15. NGL Gas Equivalent 75,341 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 278,254 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 13: Lift Gas Off Field; Block l7: MI from Prudhoe = 213,400 and Fuel Gas from Prudhoe = 64,854 1 hereby certify that th foregoing is true ,�and dccorrect to the best of my knowledge. /l/In71 / '/ / ,& Note: All volumes must be corrected Signature W �V it Ac (� Title Mana er Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a // /, temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator BP 5. MonthNear of Disposition September -2014 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 86,198 Pool Name Pool Code Percent 7. Reinjected 9,165,485 Lisburne 640144 U.N. Niakuk 640148 0.5% 8. Flared or vented 1 hour or less 0 North Prudhoe Bay State 640152 0.0% Sadlerochit 640150 0.0% 9. Flared or vented more than 1 hour (see instr.) 0 Point McIntyre 640180 61.0% Ivishak-SagRiver test in 640147 0.6% 10. Pilot and Purge 11,176 West Beach 640186 0.0% 11. Assist Gas 160,791 12. Fuel gas used in lease operations. 771,748 13. Other (see instructions) 811 Official Use Only Authorization>1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6.12) 10,196,209 Lease Use MCF 15. NGL Gas Equivalent 86,198 Conservation MCF 16. Purchased gas Q Waste: MCF 17. Transferred from: 0 18. Transferred to: (Express as a negative #) Q Commissioner Date 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 0 and Fuel Gas from Prudhoe = 0 1 hereby certify that the foregoing is true and correct to the best of my knoviledge. /,//���,�y /n Note: All volumes must be corrected Signature _ a/ ZI �! / , �� Title Manager Production Taxes and Royalties Alaska t0 pressure of 14.65 psis and to a /� / / / temperature of 60o F. Authority 20 Printed Name Diane Colley( Phone (907) 564-5775 Date `f AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator BP 5. MonthNear of Disposition October -2014 Disposition Volume MCF 20. For production (mm multiple pools, list mnhibution of each pool as a percent of Total Volume. 6. Sold 22,891 Pool Name Pool Code Percent 7. Reinjected 3,874,880 Lisburne 640144 14.8% Niakuk 640148 0.1% 8. Flared or vented 1 hour or less 2,462 North Prudhoe Bay State 640152 0.0% Sadlerochit 640150 8.7% 9. Flared or vented more than 1 hour (see instr.) 9 383 Point McIntyre 640180 76.2% 11 ishak-SagRiver test in 640147 0.3% 10. Pilot and Purge 41,012 West Beach 640186 0.0% 11. Assist Gas 95,499 12. Fuel gas used in lease operations. 300,029 13. Other (see instructions) 25,290 Official Use Only Authorization >7 hr: Safety 9383 J MCF 14. TOTAL VOLUME (ITEMS 6-72) 4,371,446 Lease Use MCF 15. NGL Gas Equivalent 22,891 Conservation MCF 16. Purchased gas 0 Waste: MCF Transferred from: 84,829 2_/S117. 1-2-1,5-- Commissioner Date 18. 8. Transferred to: (Express as a negative #) 0 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 0 and Fuel Gas from Prudhoe = 84,829 1 hereby certify that a foregoing is true and correct to the best of my knowledge. /� /t�1 Note: All volumes must be corrected Signature_ a 1 Lf Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a 1 i / temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date /1 14 AAC25.235. vri— l2/r4 l t+ Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate DATE TIME VOLUME JMSCFJ BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct -14 DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 10/6/2014 2109-2209 133 Depressured 24 common -line. Y Production fiowiine depressured to 200 psi 10/7/2014 0205-0241 104 Depressured 24 common -line. Y Depressured East side fuel gas and East side c 10/7/2014 2028-0253 44 Shutdown of 1808 compressorfor Maint. Y Flare valve closed after depressure of 1808 cc 10/8/2014 0113-0119 1 Blowdown of the case on 1808 compressor for Maint. Y Flare valve closed after 1808 case at zero. 10/13/2014 2029-2033 72 1807 Shutdown for RGI sleeve repair Y 1807 T/C depressurization complete 10/27/2014 1807-1808 10 1801 STV/IP: Attempeted to start after plant shutdown. N Start failed. Reassessing startup monitoring fit 10/28/2014 0438-0456 11 1801 STV/IP shutdown on low suction pressure N Secure 1801 STV/IP and prepare for restart 10/28/2014 0459-0521 20 Process Upset due to Fluid slug entering plant N Adjusted plant Process as needed to resolve a Total Flare c=1 Hour 395 10/13/2014 2132-0000 1,412 Depressured 24 common -line. Y RGI depressured to 560 PSI 10/14/2014 0000-1216 5,170 Depressured RGI line Y RGI depressured to 560 PSI 10/28/2014 0053-0435 0 Process upset while starting plant N adjusted process as needed Total Flare > I Hour 6,582 Volume Flared 6,977 Measured Safety Pilot 6,719 Continuous Assist 14,236 TOTAL FLARED 27,932 DATE TIME VOLUME (MSCF) BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct -14 DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 10/6/2014 2109-2209 813 Depressured 24 common -line. y Production flowline depressured to 200 psi 10/7/2014 0205-0241 479 Depressured 24 common -line. y Depressured East side fuel gas and East side e 10/7/2014 2028-0253 206 Shutdown of 1808 compressor for Maint. y Flare valve closed after depressure of 1808 co 10/8/2014 0113-0119 6 Blowdown of the case on 1808 compressor for Maint. y Flare valve closed after 1808 case at zero. 10/13/2014 2029-2033 32 1807 Shutdown for RGI sleeve repair y 1807 T/C depressurization complete 10/27/2014 1807-1808 39 18015TV/IP: Attempeted to start after plant shutdown. N Start failed. Reassessing startup monitoring fl: 10/28/2014 0438-0456 99 18015TV/IP shutdown on low suction pressure N Secure 1801 STV/IP and prepare for restart 10/28/2014 0459-0521 184 Process Upset due to Flluid slug entering plant N Adjusted plant process as needed to resolve a Total Flare <=1 Hour 1,858 10/13/2014 2132-0000 635 Depressured 24 common -line. y RGI depressured to 560 PSI 10/14/2014 0000-1216 0 Depressured RGI line y RGI depressured to S60 PSI 10/28/14 0053-0435 4 Process upset while starting plant N adjusted process as needed Total Flom > 1 Hour 639 Volume Flared 2,497 Measured Safety Pilot 32,285 Continuous Assist 69,705 TOTAL FLARED 104,487 SP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct -14 PLANNED VOLUME UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE TIME (M DESCRIPTION OF INCIDENTS &CAUSE DATE Production flowld depressured to 200 Psi 10/6/2014 2109-2209 0 De ressured 24 common -line. P y y Depressured East side fuel gas and East side common line Eas si 10/7/2014 0205-0241 0 Depressured 24 common -line. y Flare valve closed after depressure of 1808 compressor. 10/7/2014 2028-0253 0 Shutdown of 1808 compressor for Maint. y Flare valve closed after 1808 case at zero. 10/8/2014 0113-0119 0 Blowdown of the case on 1808 compressor for Maint. V 1807 T/C depressurization complete 10/13/2014 2029-2033 110 1807 Shutdown for RGI sleeve repair to start after plant shutdown. Start failed. Reassessing startup monitoring flare valves. for 10/27/2014 1807-1808 16 1801 STV/IP: Attempeted STV/IP shutdown on low suction pressure N Secure 18015TV/IP and prepare restart as needed to resolve abnormally h 10/28/2014 0438-0456 27 1801 Upset due to Fluid slug entering plant N Adjusted plant process 10/28/2014 0459-0521 50 Process Total Flare <- 3 Hour 203 y ftGl depressured to 560 P51 10/13/2014 2132-0000 2,161 Depressured 24 common -line. y RGI depressured to 560 PSI 10/14/2014 0000-1216 0 Depressured RGI line N adjusted process as needed 10/28/2014 0053-0435 1 Process upset while starting plant Total Flare > 1 Hour 2,162 Volume Flared 2,365 Measured Safety Pilot 1,991 Continuous Assist 11,296 TOTALFLARED 15,652 Total Flare <=1 Hour 6 10/13/2014 2132-0000 0 Depressured 24 common -line. Y RGI depressured to S60 PSI 10/14/2014 0000.1216 0 Depressured RGI line Y RGI depressured to 560 PSI 10/28/2014 0053-0435 0 Process upset while starting plant N adjusted process as needed Total Flare > I Hour 0 Volume Flared SP EXPLORATION ALASKA, INC, Measured Safety Pilot 13 Continuous Assist 202 TOTALFLARFO CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct -14 DATE TIME VOLUME (MscQ DESCRIPTION OF INCIDENTS &CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 10/6/2014 2109-2209 6 Depressured 24 common -line. Y Production flowline depressured to 200 psi Depressured East side fuel gas and East side c 10/7/2014 0205-0241 0 Depressured 24 common -line. V Y Flare valve closed after depressure of 1808 cc 10/7/2014 2028-0253 0 Shutdown of 1808 compressor for Maint. the case on 1808 compressor for Maint. Y Flare valve closed after 1808 case at zero. 10/8/2014 0113-0119 0 Blowdown of Y 1807 TIC depressurization complete 10/13/2014 2029-2033 0 1807 Shutdown for RGI sleeve repair N Start failed. Reassessing startup monitoring fl. 10/27/2014 1807-1808 0 1801 STV/IP: Attempeted to start after plant shutdown. Secure 1801 STV/IP and prepare for restart 10/28/2014 D438-0456 0 1801 STV/IP shutdown on low suction pressure N N Adjusted plant process as needed to resolve a 10/28/2014 0459-0521 0 Process Upset due to Flluid slug entering plant Total Flare <=1 Hour 6 10/13/2014 2132-0000 0 Depressured 24 common -line. Y RGI depressured to S60 PSI 10/14/2014 0000.1216 0 Depressured RGI line Y RGI depressured to 560 PSI 10/28/2014 0053-0435 0 Process upset while starting plant N adjusted process as needed Total Flare > I Hour 0 Volume Flared 6 Measured Safety Pilot 13 Continuous Assist 202 TOTALFLARFO 221 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct -14 VOLUME PLANNED O DATE TIME (UM DESCRIPTION OFINCIDENTS &CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 10/06/14 2109-2209 Depressured 24 common -line. 10/07/14 0205-0241 Depressured 24 common -line. 10/07/14 2028-0253 Shutdown of 1808 compressor for Maint. 10/08/14 0113-0119 Blowdown of the case on 1808 compressor for Maint. 10/13/14 2029-2033 1807 Shutdown for RGI sleeve repair 10/27/14 1807-1808 1801 STV/IP: Attempeted to start after plant shutdown. 10/28/14 0438-0456 1801 STV/IP shutdown on low suction pressure 10/28/14 0459-0521 Process Upset due to Flluid slug entering plant Total Flare <=1 Hour 0 10/13/14 2132-0000 Depressured 24 common -line. 10/14/14 0000-1216 Depressured RGI line 10/28/14 0053-0435 Process upset while starting plant Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTALFLARED 0 Production flawline depressured to 200 psi Depressured East side fuel gas and East side c Flare valve closed after depressure of 1808 cc Flare valve closed after 1808 case at zero. 1807 T/C depressurization complete Start failed. Reassessing startup monitoring fl: Secure 1801 STOP and prepare for restart Adjusted plant process as needed to resolve a RGI depressured to 560 PSI RGI depressured to 560 PSI adjusted process as needed Total Flare > 1 Hour U Volume Flared SP EXPLORATION ALASKA, INC, Measured Safety Pilot 0 Continuous Assist 0 TOTALFLARED CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct -14 VOLUME PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE DATE TIME MSCF DESCRIPTION OF INCIDENTS &CAUSE Y Production depressured to 200 psi 10/06/14 2109-2209 0 Depressured 24 common -line. Y DepressuEast side fuel gas and East side c- redd Eas 10/07/14 10/07/14 0205-0241 0 Depressured 24 common -line. y Flare valve closed after depressure of 1808 co 10/07/14 2028-0253 0 Shutdown of 1808 compressor for Maint. y Flare valve closed after 1808 case at zero. 10/08/14 0113-0119 0 Blowdown of the case on 1808 compressor for Maint. 1807 T/C depressurization complete 10/13/14 2029-2033 0 1807 Shutdown for RGI sleeve repair Y Start failed. Reassessing startup monitoring fl; 10/27/14 1807-1808 0 1801 STV/IP: Attempeted to start after plant shutdown. N Secure 1801 STOP and prepare for restart 10/28/14 0438-0456 0 1801 STV/IP shutdown on low suction pressure N Adjusted plant process as needed to resolve a 10/28/14 0459-0521 0 Process Upset due to Flluid slug entering plant Total Flare <=1 Hour 0 y RGI depressured to 560 PSI 10/13/14 2132-0000 0 Depressured 24 common -line. y RGI depressured to 560 Psi 10/14/14 0000-1216 0 Depressured RGI line N adjusted process as needed 10/28/14 0053-0435 0 Process upset while starting plant Total Flare > 1 Hour U Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTALFLARED 0 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct -14 Total Flare <-1 Hour U 10/13/2014 2132-0000 0 Depressured 24 common -line. 10/14/2014 0000-1216 0 Depressured RGI line 10/28/2014 0053-0435 0 Process upset while starting plant Total Flare>I Hour 0 Volume Flared 0 Measured Safety Pilot 4 PLANNED 60 TOTALFLARED 64 VOLUME UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE TIME Ms DESCRIPTION OF INCIDENTS & CAUSE DATE y Production flowline depressured to 200 psi 10/6/2014 2109-2209 0 Depressured 24 common -line. Y Depressured East side fuel gas and East side c 10/7/2014 0205-0241 0 24 common -line. Y Flare valve closed after depressure of 1808 cc 10/7/2014 2028-0253 0 ShutdownDepressuredo Shutdown of 1808 compressor for Flare valve closed after 1808 case at zero. 10/8/2014 0113-0119 0 pressnt. of the case on 1808 compressor for Maint. Y 1807 T/C depressurization complete 10/13/2014 2029-2033 0 1807 Shutdown for RGI sleeve repair 1807 Shutdown N Start failed. Reassessing startup monitoring ft 10/27/2014 1807-1808 0 1801 SN/IP: to start after plant shutdown. N Secure 1801 SN/IP and prepare for restart 10/28/2014 0438-0456 0 1801 SN/IP shutdown on low suction pressure shutdown o N Adjusted plant process as needed to resolve a 10/28/2014 0459-0521 0 Process Upset due to Flluid slug entering plant Total Flare <-1 Hour U 10/13/2014 2132-0000 0 Depressured 24 common -line. 10/14/2014 0000-1216 0 Depressured RGI line 10/28/2014 0053-0435 0 Process upset while starting plant Total Flare>I Hour 0 Volume Flared 0 Measured Safety Pilot 4 Continuous Assist 60 TOTALFLARED 64 RGI depressured to 560 PSI RGI depressured to 560 PSI adjusted process as needed STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator BP 5. MonthNear of Disposition November -2014 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent o/ Total Volume. 6. Sold 73,572 Pool Name Pool Code Percent 7. Reinjected 8,703,656 Lisburne 640144 15.8% Niakuk 640148 0.0% 8. Flared or vented 1 hour or less 676 North Prudhoe Bay State 640152 0.0% Sadlerochit 640150 15.1% 9. Flared or vented more than 1 hour (see instr.) 0 Point McIntyre 640180 69.1% Ivishak-SagRiver test in 640147 0.0% 10. Pilot and Purge 11,089 West Beach 640186 0.0% 11. Assist Gas 162,177 12. Fuel gas used in lease operations. 738,584 13. Other (see instructions) 18,558 Official Use Only Authorization>1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6.12) 9,708,312 Lease Use MCF 15. NGL Gas Equivalent 73,572 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 706,936 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 706,851 and Fuel Gas from Prudhoe = 85 1 hereby certify that the foregoing is true and correct to the best of my knowledge. &d" D� Note: All volumes must corrected Signature Tige Mana er Production Taxes and Ro aloes Alaska to pressure of 14.65 psiss and to a temperature of 60o F. Authority 20 Printed Name Diane Coll e Phone (907) 564-5775 Date AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION RECEIVED JAN 16 2015 AOGCC 1. Facility Number 0290000009 2. Facility Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator 5. MonthNear of Disposition BP I December -2014 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 78,183 Pool Name Pool Code Percent 7. Reinjected 10,794,011 Lisburne 640144 22.2% Niakuk 640148 0.2% 8. Flared or vented 1 hour or less 0 North Prudhoe Bay State 640152 0.0% Sadlerochit 640150 9.2% 9. Flared or vented more than 1 hour (see instr.) 15,440 Point McIntyre 640180 67.7% Ivishak-SagRiver test in GPMA 640147 0.7/0 10. Pilot and Purge 11,417 West Beach 1 640186 1 0.0% 11. Assist Gas 171,801 12. Fuel gas used in lease operations. 821,355 13. Other (see instructions) 149,293 Oficial Use Only Authorization >7 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6.12) 12,041,500 Lease Use MCF 15. NGL Gas Equivalent 78,183 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 860,071 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19 Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 859,855 and Fuel Gas from Prudhoe = 216 1 hereby certify that the foregoing is true and correct to the best of my knowledge. V1 eC Signature rt tIC Title Manager Production Taxes and Ro a1Nes Alaska Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Diane Colley Phone (907) 564-5775 Date l /� / Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate DATE TIME 12/18/2014 1325-1335 VOLUME A Total Flare <= 1 Hour 0 12/1/2014 0154-0847 1,196 12/27/2014 1221-1335 1,265 Total Flare> 1 Hour 2,461 Volume Flared 2,461 Measured Safety Pilot 2,520 Continuous Assist 37,698 TOTALFLARED 42,679 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Dec -14 DESCRIPTION OF INCIDENTS & CAUSE Not required for unplanned events <= 1 hour 1807 Reinjection compressor shutdown because of control/instrumentation failure associated with WHRU Louvre control failure and subsequent attempted restarts. 1808 Reinjection compressor shutdown because of control/instrumentation failure associated with C2 Compressor fl2 Axial. Black smoke lasted approximately 8 minutes. -IVED JAN 16 2015 AOGVx/C PLANNED UNPLANNED ACTION TAKEN TO N Not required for unplanned events <= 1 hour 1807 was depressurized, repaired and N restarted. Completed troubleshooting, reloaded 1808 T/C, and stabilized facility process and N operation. BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Dec -14 RECEIVED ,IAN 16 2015 OGCC Total Flare <=1 Hour 0 12/1/2014 0154-0847 7,703 12/27/2014 1221-1335 3,398 Total Flare> 1 Hour 11,101 Volume Flared 11,101 Measured Safety Pilot VOLUME Continuous Assist PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 12/18/2014 1325-1335 0 Not required for unplanned events <= 1 hour N Not required for unplanned events <= 1 hour Total Flare <=1 Hour 0 12/1/2014 0154-0847 7,703 12/27/2014 1221-1335 3,398 Total Flare> 1 Hour 11,101 Volume Flared 11,101 Measured Safety Pilot 7,737 Continuous Assist 116,575 TOTAL FLARED 135,413 1807 Reinjection compressor shutdown because of control/instrumentation failure associated with WHRU Louvre control failure and subsequent attempted restarts. N 1808 Reinjection compressor shutdown because of control/instrumentation failure associated with C2 Compressor #2 Axial. Black smoke lasted approximately 8 minutes. N 1807 was depressurized, repaired and restarted. Completed troubleshooting, reloaded 1808 T/C, and stabilized facility process and operation. BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Dec -14 RECEIVED JAN 16 2015 4,OGCC Total Flare <=1 Hour 0 12/1/2014 0154-0847 22 12/27/2014 1221-1335 15 Total Flare > 1 Hour 37 Volume Flared 37 Measured Safety Pilot 26 Continuous Assist 392 TOTAL FLARED 455 1807 Reinjection compressor shutdown because of control/instrumentation failure associated with WHRU Louvre control failure and subsequent attempted restarts. N 1808 Reinjection compressor shutdown because of control/instrumentation failure associated with C2 Compressor N2 Axial. Black smoke lasted approximately 8 minutes. N 1807 was depressurized, repaired and restarted. Completed troubleshooting, reloaded 1808 T/C, and stabilized facility process and operation. VOLUME PLANNED DATE TIME (Mscf( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 12/18/2014 1325-1335 0 Not required for unplanned events <= 1 hour N Not required for unplanned events <= 1 hour Total Flare <=1 Hour 0 12/1/2014 0154-0847 22 12/27/2014 1221-1335 15 Total Flare > 1 Hour 37 Volume Flared 37 Measured Safety Pilot 26 Continuous Assist 392 TOTAL FLARED 455 1807 Reinjection compressor shutdown because of control/instrumentation failure associated with WHRU Louvre control failure and subsequent attempted restarts. N 1808 Reinjection compressor shutdown because of control/instrumentation failure associated with C2 Compressor N2 Axial. Black smoke lasted approximately 8 minutes. N 1807 was depressurized, repaired and restarted. Completed troubleshooting, reloaded 1808 T/C, and stabilized facility process and operation. BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Dec -14 DATE TIME VOLUME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE 12/18/2014 1325-1335 0 Not required for unplanned events <= 1 hour Total Flare <= 1 Hour 0 12/1/2014 0154-0847 0 12/27/2014 1221-1335 51 Total Flare> 1 Hour 51 Volume Flared 51 Measured Safety Pilot 80 Continuous Assist 1,187 TOTALFLARED 1,318 ECEIVE® JAN 16 // Z00(1�o5 Ofl � OGCC PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE N Not required for unplanned events <= 1 hour 1807 Reinjection compressor shutdown because of control/instrumentation failure associated with WHRU Louvre control failure and subsequent attempted restarts. N 1808 Reinjection compressor shutdown because of control/instrumentation failure associated with C2 Compressor N2 Axial. Black smoke lasted approximately 8 minutes. N 1807 was depressurized, repaired and restarted. Completed troubleshooting, reloaded 1808 T/C, and stabilized facility process and operation. BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Dec -14 Total Flare <= 1 Hour 0 12/1/2014 0154-0847 1,326 12/27/2014 1221-1335 464 Total Flare> 1 Hour 1,790 VOLUME 1,790 PLANNED 1,054 DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 12/18/2014 1325-1335 0 Not required for unplanned events <= 1 hour N Not required for unplanned events <= 1 hour Total Flare <= 1 Hour 0 12/1/2014 0154-0847 1,326 12/27/2014 1221-1335 464 Total Flare> 1 Hour 1,790 Volume Flared 1,790 Measured Safety Pilot 1,054 Continuous Assist 15,949 TOTAL FLARED 18,793 1807 Reinjection compressor shutdown because of control/instrumentation failure associated with WHRU Louvre control failure and subsequent attempted restarts. N 1808 Reinjection compressor shutdown because of control/instrumentation failure associated with C2 Compressor #2 Axial. Black smoke lasted approximately 8 minutes. N 1807 was depressurized, repaired and restarted. Completed troubleshooting, reloaded 1808 T/C, and stabilized facility process and operation. yy,IIAN 16 //''112015 Y OGCC BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Dec -14 RECEIVED JAN 16 2015 Total Flare <= 1 Hour 0 12/01/14 0154-0847 0 12/27/14 1221-1335 0 Total Flare> 1 Hour 0 Volume Flared 0 Measured Safety Pilot VOLUME Continuous Assist PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 12/18/14 1325-1335 Not required for unplanned events <= 1 hour N Not required for unplanned events <= 1 how Total Flare <= 1 Hour 0 12/01/14 0154-0847 0 12/27/14 1221-1335 0 Total Flare> 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTALFLARED 0 1807 Reinjection compressor shutdown because of control/instrumentation failure associated with WHRU Louvre control failure and subsequent attempted restarts. N 1808 Reinjection compressor shutdown because of control/instrumentation failure associated with C2 Compressor #2 Axial. Black smoke lasted approximately 8 minutes. N 1807 was depressurized, repaired and restarted. Completed troubleshooting, reloaded 1808 T/C, and stabilized facility process and operation. A®GCC BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Dec -14 RECEIVE® JAN 16 2015 A0(71C%C VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 12/18/14 1325-1335 0 Not required for unplanned events <= 1 hour N Not required for unplanned events <= 1 how Total Flare <=1 Hour 0 12/01/14 0154-0847 0 12/27/14 1221-1335 0 Total Flare> 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 1807 Reinjection compressor shutdown because of control/instrumentation failure associated with WHRU Louvre control failure and subsequent attempted restarts. N 1808 Reinjection compressor shutdown because of control/instrumentation failure associated with C2 Compressor P2 Axial. Black smoke lasted approximately 8 minutes. N 1807 was depressurized, repaired and restarted. Completed troubleshooting, reloaded 1808 T/C, and stabilized facility process and operation.