Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutEndicott / BP 'j ,;·;"~'!';;;tO/A!9.;U%..%ø·.-w.4Y~.4W#/U~.øv4fVAIP#'..4fV..4fV~I~I/AYAY#'~14IiY..w/..4fVAJlYØ/..4fVH/#'1/¡¡yhÍlW/$:~I/~I4ØYI"I/H/I/I/I/I/I/'/ÂY/I/H/,.-w/AY#/U/I/I/#/8/U/I/..ØXN/.'AlYMP"/I/I/AY,ØY.øY~AlPAPH/'4W/A'/I/..@~:Øf;;ir;:¡ A; n ri~ ~ ~~ ?roluc~ioI~ Fi~eS 1991 . G/V.J/a07 T t3P j':1':;'P.:;;f1:;;WAS/~~Wdtrl/,/ø/..ø;~~AYIÆ!VÆ!V/'~.MYM'AYI~.I/Ø'#/I/.I~I~#'ø.MP/~..øy~W/.ø?Ø./.I/AW''''/H~K/.#/'/I/I/,/"Mr'/'/'/I/A'/.;w.;wA~'/I''/I4fW"AWIAIØI7...61r.ø/I/AJVAJVI4fPÆ!V/..#'/I/A!f!7.4'%.%IIf%*:-:¥P,;::~F:; BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 February 6, 1997 Alaska Oil & Gas Conservation Commission ATTN: Steve McMains 3001 Porcupine Drive Anchorage, AK 99501-3192 RECEIVED FEa 10 1997 Alaska 01/ & Gas Cons. Commission Enclosed, in duplicate, are the Monthly Production Reporfn~FM 10-405), Monthly Injection Report (Form 10-406), Oil Reconciliation Report, and NGL Monthly Production Report covering the Endicott Field for January 1997. A portion of the production from Sag Delta North is being allocated to the Endicott Participating Area. The purpose of this reallocation is to correct an overallocation of production which occurred from December 1994 through May 1995. Please refer to the attached documentation for further details. If you have any questions regarding these reports, please call Anne Fiedler at 564-5826. Sincerely, !od /J 11¡ Paul D. Sly Manager, Volume, Royalty & Severance Enclosures e e Run Date: Run Time: PA OA e e 02/05/97 14:18:06 EPA END BP Exploration (Alaska) Inc. Oil Movement Accounting & Reporting Alaska Oil and Gas Conservation Commission Oil Reconciliation Report From Date: To Date: 1/1/97 1/31/97 Description Pipeline Deliveries, END Oil Volume 2,249,552 TOTAL PIPELINE DELIVERIES 2,249,552 NGL Deliveries, END -154,660 TOTAL NGL DELIVERIES -154,660 Allocation of SLP to SON -21,664 Load Diesel, EPA -56 Upstream Losses, EPA o Downstream Losses, EPA o TOTAL FIELD PRODUCTION 2,073,172 J> ji) (/) ~ þ e 'T1 :;0 ø fïl rT1 fE to () --.I n¡ fi¥ 0 - -> < §' <.0 :::¡ (,0 r'T"i II: -..J ;:j 0 ,I I hereby ce~i~~~~hd;gOing is true and correct to the best of my knowiedge. Signed: 1'Últ{ <-11f Tnle: /M.6K.. t/ot-, ¡ZOY (s;..;. 2.7.11 Date: Page 1 Report # SUMDUD - 05 SON Pay Back of Overallocated Production Background - SDN was overallocated production between 12/94 and 5/95. Sag Delta's reported values were too high which made Endicott's too low. Revised reports for those 6 months were distributed in October, 1995 but then retracted in March, 1996 because they reallocated production that had already been delivered to owners. The corrections could not be made retroactively. Solution - SDN will pay back Endicott, in three installments, over the next three months. This month, SDN production has been intentionally reduced by 1/3 the amount owed which amounts in a pay back to Endicott of the same amount. Details are below. SDN Allocation originally taken Oil (bb's) Ngl (bbls) Gas (msd) Water (bbls) Dec-94 30,222 583 42,899 317,942 Jan-95 13,838 141 10,693 335,955 Feb-95 4,142 64 4,731 177,980 Mar-95 29,253 254 19,012 286,728 Apr-95 20,879 179 13,120 293,449 May-95 34,998 151 21,900 320,813 Total 133,332 1,372 112,355 1,732,867 SDN Allocation should have been Oil (bbls) Ngl (bbls) Gas (msd) Water (bbls) Dec-94 26,760 225 16,976 273,194 Jan-95 10,914 94 6,934 231,802 Feb-95 3,821 36 2,407 107,612 Mar-95 26,353 223 16,551 261,907 Apr-95 20,245 175 12,719 - 272,943 May-95 34,740 151 21 ,737 312,487 Total 122,833 904 77,324 1,459,945 SDN Overallocation - To be paid back in thirds Oct, Nov, Dec 1996 (extended to Jan 1997) Oil (bbls) Ngl (bbls) Gas (msd) Water (bbls) Dec-94 3,462 358 25,923 44,748 Jan-95 2,924 47 3,759 104,153 Feb-95 321 28 2,324 70,368 Mar-95 2,900 31 2,461 24,821 Apr-95 634 4 401 20,506 May-95 258 0 163 8,326 Total 10,499 468 35,031 272,922 SON owes EPA (10,499) (468) (35,031 ) (272,922) Sum pay back for 10/96-1/97 0 0 0 o I PAY BACK IS COMPLETE SDN Pay Back Oil (bb's) Ngl (bbls) Gas(mscf) Water (bbls) 23,716 174 14,848 173,771 Real allocation for SON 10/96 (3,500) (156) (11,677) (90,974) Less 1/3 total SON owes EPA 20,216 18 3,171 82,797 Reported allocation for SON 10/96 25,096 176 15,714 167,815 Real allocation for SON 11/96 (3,500) (156) (11,677) (90,974) Less 1/3 total SON owes EPA 21,596 20 4,037 76,841 Reported allocation for SON 11/96 15,043 123 9,419 130,237 Real allocation for SON 12/96 (3,499) (123) (9,419) (90,974) Pay back - not enough ngl & gas to complete 11,544 0 0 39,263 Reported allocation for SON 12/96 21,664 177 13,564 180,357 Real allocation for SON 1/97 0 (33) (2,258) o Pay back last ngl & gas 21 ,664 144 11,306 180,357 Reported allocation for SON 1/97 e e BP EXPLORATION (ALASKA) INC. WELL PRODUCTION WELL 1-17/SAG DELTA #2 JANUARY 1997 1 0 0 0 0 0 0.00 0 0 2 ,0 0 0 0 0 0.00 0 0 3 0 0 0 0 0 0.00 0 0 4 0 0 0 0 0 0.00 0 0 5 0 0 0 0 0 0.00 0 0 6 {) 0 0 0 0 0.00 0 0 7 0 0 0 0 0 0.00 0 0 e 8 0 0 0 0 0 0.00 0 0 9 0 0 0 0 0 0.00 0 0 10 0 0 0 0 0 0.00 0 0 11 0 0 0 0 0 0.00 0 0 12 0 0 0 0 0 0.00 0 0 13 0 0 0 0 0 0.00 0 0 14 0 0 0 0 0 0.00 0 0 15 0 0 0 0 0 0.00 0 0 16 0 0 0 0 0 0.00 0 0 17 0 0 0 0 0 0.00 0 0 18 0 0 0 0 0 0.00 0 0 19 0 0 0 0 0 0.00 0 0 20 0 0 0 0 0 0.00 0 0 21 0 0 0 0 0 0.00 0 0 22 0 0 0 0 0 0.00 0 0 23 0 0 0 0 0 0.00 0 0 24 0 0 0 0 0 0.00 0 0 25 0 0 0 0 0 0.00 0 0 26 0 0 0 0 0 0.00 0 0 e 27 0 0 0 0 0 0.00 0 0 ::r.- 28 0 0 0 0 0 0.00 0 0 ¡:;; <fl 29 0 0 0 0 0 0.00 0 0 ;:<:' t:I) 30 0 0 0 0 0 0.00 0 0 g 'T1 ;;V 31 0 0 0 0 0 0.00 0 0 QO m r-n »G) tlJ () :::J¡:u 0", go -' n-¡ -,0 0 p.):::J <::J en ......... < (\) . 0 <.0 Plugged and abandoned 1/24/97. Not involved in pay back. 0 <..P m 3 -.! 3 0 w' en õ' ::;;I BP EXPLORATION (ALASKA) INC. WELL PRODUCTION WELL 2-321SAG DELTA #3 JANUARY 1997 WI 1][ 1m¡ -II },_:::_ L~~ l~u::»1II~:j~'-::UM.!'I~I,tiJJI~~m"mtíJ 1 344 2 215 920 0 24.00 291 122 2 ;342 2 214 924 0 24.00 295 122 3 339 2 212 929 0 24.00 298 122 4 337 2 211 934 0 24.00 299 123 5 334 2 209 939 0 24.00 299 123 6 332 2 208 944 0 24.00 307 123 7 330 3 207 940 0 24.00 301 123 e 8 328 3 206 935 0 24.00 296 123 9 327 3 205 930 0 24.00 299 123 10 325 3 204 925 0 24.00 303 123 11 323 3 202 921 0 24.00 299 123 12 322 3 201 916 0 24.00 296 119 13 320 3 200 911 0 24.00 293 121 14 319 3 199 907 0 24.00 304 123 15 297 3 186 871 0 22.80 300 124 16 306 3 192 927 0 24.00 293 124 17 300 3 188 937 0 24.00 294 123 18 294 2 184 947 0 24.00 299 123 19 288 2 180 957 0 24.00 300 123 20 282 2 176 967 0 24.00 296 123 21 276 3 173 977 0 24.00 306 123 22 276 3 173 977 0 24.00 293 123 23 276 2 173 977 0 24.00 290 123 24 276 2 173 977 0 24.00 295 122 25 216 2 173 977 0 24.00 296 122 26 276 2 173 977 0 24.00 297 122 e 27 276 2 173 977 0 24.00 296 122 28 276 2 173 977 0 24.00 294 122 29 276 2 173 978 0 24.00 292 122 30 262 2 164 931 0 22.83 299 124 31 276 2 173 978 0 24.00 301 123 .~""'lII1W1i~"._~I"""" Not Involved in pay back this month. BP EXPLORATION (AlASKA) INC. WELL PRODUCTION WELL 2-38/SAG DELTA #1 JANUARY 1997 1~rn . Ddì~;t--~;~'U:::~:¡Ni1~nrn REAL JANUARY 97 ALLOCATION (BEFORE PAY ElACK)* ,,, ~~-~,j& OIL NGL GAS WTR 1 130 0 7 3,129 0 24.00 734 158 130 1 82 3129 2 1.30 1 7 3,129 0 24.00 742 158 130 2 82 3129 3 189 0 43 5,062 0 24.00 351 173 189 1 118 5062 4 219 1 62 3,540 0 16.23 310 176 219 2 137 3540 5 337 2 136 5,251 0 24.00 310 174 337 3 211 5251 6 351 2 144 5,268 0 24.00 310 176 351 3 219 5268 7 364 2 153 5,286 0 24.00 308 176 364 3 228 5286 e 8 377 2 161 5,303 0 24.00 300 176 377 3 236 5303 9 391 2 170 5,320 0 24.00 295 176 391 3 245 5320 10 404 2 178 5,337 0 24.00 299 176 404 3 253 5337 11 335 2 135 4,290 0 19.23 294 176 335 3 210 4290 12 0 0 0 0 0 0.00 0 0 0 0 0 0 13 371 2 157 4,491 0 20.00 298 168 371 3 232 4491 14 458 2 212 5,406 0 24.00 293 174 458 3 287 5406 15 447 3 205 5,145 0 22.77 308 174 447 4 280 5145 16 462 2 214 5,436 0 24.00 292 175 462 3 289 5436 17 452 3 208 5,449 0 24.00 293 176 452 4 283 5449 18 443 3 202 5,462 0 24.00 296 176 443 4 277 5462 19 433 2 196 5,474 0 24.00 296 176 433 3 271 5474 20 424 2 190 5,487 0 24.00 293 176 424 3 265 5487 21 414 3 184 5,500 0 24.00 303 176 414 4 259 5500 22 433 3 196 5,453 0 24.00 293 176 433 4 271 5453 23 453 3 209 5,407 0 24.00 287 176 453 4 284 5407 24 472 3 220 5,360 0 24.00 291 176 472 4 296 5360 25 492 3 232 5,314 0 24.00 294 176 492 4 308 5314 26 511 3 244 5,267 0 24.00 294 176 511 4 320 5267 e 27 531 3' 256 5,220 0 24.00 292 176 531 4 332 5220 28 550 4 268 5,174 0 24.00 290 176 550 5 344 5174 29 570 3 281 5,128 0 24.00 305 176 570 5 357 5128 30 540 3 262 4,857 0 22.73 299 176 540 5 338 4857 31 570 3 281 5,128 0 24.00 297 176 570 5 357 5128 ~~~~ . ~111I1II¡m..~~¡lt'" 12,253 1 02 7,671 151,073 Ra:X..ŒD 0 (33) (2,258) 0 . SDN was overallocated production between 12/94 and 5/95. The volumes will be paid back between 10/96 and 1/97. This completes the pay back. State of Alaska Run Date: 02/05/97 Alaska Oil and Gas Conservation Commission Run Time: 14:06:10 Monthly Production Report 20 MC 25.230 Page 1 BP Exploration (Alaska) Inc. Endicott Operating Area January, 1997 Daily Average Production Total Monthly Production Well API C Field M Days Gas-Oil Tubing Oil Water Gas Oil Water Gas Name Number L & Pool T In Ratio PSIG BBL BBL MCF BBL BBL MCF 50- S Code H Oper. 1-01/J-19 2180100 0 220100 1 31 5,915 526 2,042 877 12,082 63,317 27,177 374,551 1-03/P-16 2260100 0 220100 1 31 10,599 2,556 2,444 2,603 25,900 75,749 80,706 802,887 1-09/J-18 2174300 0 220100 8 0 0 0 0 0 0 0 0 0 1-19/1-18 2256900 0 220100 1 31 8,883 612 1,641 9,887 14,578 50,876 306,485 451,928 _1/K-25 2200500 0 220100 8 0 0 0 0 0 0 0 0 0 5/N-22 2172200 0 220100 1 27 15,991 2,618 1,510 274 24,146 40,770 7,390 651,951 1-27/P-20 2169300 0 220100 1 31 8,350 1,595 2,513 3,435 20,983 77,903 106,477 650,464 1-29/M-25 2166900 0 220100 1 31 3,269 501 2,105 2,653 6,881 65,260 82,236 213,309 1-31/M-21 2256200 0 220100 1 31 1,019 435 773 4,647 787 23,954 144,071 24,405 1-33/M-23 2257700 0 220100 1 31 567 299 483 3,322 274 14,964 102,987 8,480 1-35/0-25 2167200 0 220100 1 21 10,251 1,824 803 601 8,233 16,866 12,627 172,895 1-39/P-17 2182700 0 220100 2 31 6,193 1,157 1,850 8,086 11,454 57,338 250,666 355,089 1-45/0-26 2199100 0 220100 8 0 0 0 0 0 0 0 0 0 1-47/0-21 2162500 0 220100 8 0 0 0 0 0 0 0 0 0 1-49/P-21 2184100 0 220100 1 31 1,938 425 545 7,394 1,057 16,908 229,227 32,767 1-55/R-25 2178800 0 220100 8 0 0 0 0 0 0 0 0 0 1-57/R-23 2187300 0 220100 8 0 0 0 0 0 0 0 0 0 1-61/0-20 2252000 0 220100 1 31 7,312 1,529 1,766 8,329 12,909 54,732 258,199 400,178 1-63IT-22 2190500 0 220100 1 21 10,006 820 1,596 1,413 15,971 33,517 29,681 335,384 1-65/N-25 2262700 0 220100 1 31 8,711 2,397 1,630 1,893 14,196 50,519 58,690 440,063 1-67 IT -20 2198500 0 220100 1 9 6,284 933 294 6,863 1,846 2,644 61,765 16,615 2-04/M-19 2158500 0 220100 1 31 3,158 330 1,989 3,865 6,282 61,661 119,811 194,732 f 8/K-16 2177100 0 220100 2 28 1,077 304 471 6,809 507 13,187 190,653 14,206 4/0-16 2163900 0 220100 1 31 4,199 448 4,523 8,528 18,990 140,209 264,372 588,705 2-18/L-16 2203200 0 220100 1 31 6,102 408 2,315 9,235 14,126 71,769 286,278 437,900 2-20/L-15 2204800 0 220100 2 31 2,986 289 329 68 983 10,209 2,117 30,479 2-26/N-14 2181500 0 220100 2 22 717 278 25 774 18 544 17,022 390 2-28/P-19 2184700 0 220100 1 31 3,303 569 2,038 9,590 6,732 63,172 297,279 208,684 2-36/0-14 2201400 0 220100 1 31 8,203 624 3,036 7,408 24,907 94,124 229,656 772,120 2-40/S-22 2252700 0 220100 1 4 14,828 302 413 11 6,128 1,653 43 24,510 2-42/P-13 2189200 0 220100 1 3 5,319 295 133 10 706 398 31 2,117 2-46A/R-10 2192101 0 220100 1 1 616 263 445 3,932 274 445 3,932 274 2-48/0-13 2261200 0 220100 1 30 7,199 2,481 3,461 1,535 24,913 103,820 46,040 747,382 2-50/U-08 2236700 0 220100 2 3 2,647 391 685 1,014 1,814 2,056 3,042 5,442 2-52/S-14 2175000 0 220100 1 13 13,731 2,455 1,398 1,096 19,199 18,177 14,247 249,589 2-58/S-09 2204100 0 220100 2 27 9,766 332 440 427 4,299 11,884 11,516 116,065 2-60/U-13 2237500 0 220100 2 31 436 275 467 1,178 204 14,489 36,529 6,322 2-62/0-17 2164800 0 220100 8 0 0 0 0 0 0 0 0 0 Form 10-405 State of Alaska Run Date: 02/05/97 Alaska Oil and Gas Conservation Commission Run Time: 14:06: 1 0 Monthly Production Report 20 AAC 25.230 Page 2 BP Exploration (Alaska) Inc. Endicott Operating Area January, 1997 Daily Average Production Total Monthly Production Well API C Field M Days Gas-Oil Tubing Oil Water Gas Oil Water Gas Name Number L & Pool T In Ratio PSIG BBL BBL MCF BBL BBL MCF 50- S Code H Oper. 2-68/S-17 2185800 0 220100 2 1 1,000 386 2 58 2 2 58 2 3-01/N-29 2167800 0 220100 8 0 0 0 0 0 0 0 0 0 3-03/J-33 2230600 0 220100 1 1 57,565 1,082 46 1 2,648 46 1 2,648 3-05/0-29 2162400 0 220100 2 31 3,253 340 518 1,155 1,685 16,059 35,803 52,239 .9/L-28A 2178001 0 220100 1 31 1,790 484 4,215 4,602 7,545 130,665 142,649 233,896 1/M-30 2184800 0 220100 2 31 1,647 371 1,669 4,913 2,748 51 ,727 152,313 85,198 3-15/K-33 2175100 0 220100 1 31 9,374 1,066 5,371 10,944 50,355 166,516 339,258 1,561,001 3-17/J-30A 2194601 0 220100 1 2 55,202 330 45 393 2,457 89 785 4,913 3-19/R-28 2246300 0 220100 8 0 0 0 0 0 0 0 0 0 3-21/L-34 2171400 0 220100 2 31 872 337 739 6,633 645 22,912 205,633 19,988 3-23/N-32 2164500 0 220100 8 0 0 0 0 0 0 0 0 0 3-25/M-27 2212500 0 220100 2 31 9,437 541 1,012 1,626 9,554 31,385 50,391 296,185 3-27/M-33 2158600 0 220100 2 31 723 358 1,298 4,848 939 40,242 150,303 29,111 3-29/J-32 2210600 0 220100 1 31 1,258 422 3,000 5,091 3,776 93,009 157,828 117,043 3-33/K-37 2166800 0 220100 2 30 709 324 308 3,453 218 9,230 103,578 6,546 3-35/L -36 2170100 0 220100 8 0 0 0 0 0 0 0 0 0 3-37/L-35 2255400 0 220100 1 30 712 365 415 2,151 295 12,435 64,524 8,849 3-39/J-39 2176400 0 220100 8 0 0 0 0 0 0 0 0 0 3-43/P-36 2241600 0 220100 2 12 8,672 305 108 34 935 1,294 413 11,221 3-49/J-40 2173500 0 220100 8 0 0 0 0 0 0 0 0 0 4-02/0-28 2178900 0 220100 1 30 13,262 945 1,155 1,848 15,318 34,649 55,442 459,532 4-06A10-30 2172301 0 220100 2 31 862 593 1,125 2,076 969 34,871 64,359 30,045 I/M-28 2246400 0 220100 1 31 9,938 2,401 2,860 285 28,418 88,648 8,847 880,949 /S-30 2189600 0 220100 8 0 0 0 0 0 0 0 0 0 -20/M-35 2164001 0 220100 2 26 717 335 594 2,736 426 15,433 71,135 11,068 4-26/0-34 2183500 0 220100 2 9 16,619 431 46 2,040 770 417 18,360 6,930 4-28/N-37 2187000 0 220100 8 0 0 0 0 0 0 0 0 0 4-32/K-38 2255900 0 220100 1 31 727 324 362 2,616 263 11,208 81,087 8,150 4-34/0-38 2270500 0 220100 1 8 2,039 546 262 6,190 534 2,093 49,521 4,268 4-38/K-34 2248200 0 220100 8 0 0 0 0 0 0 0 0 0 4-42/P-38 2173100 0 220100 2 31 760 351 774 4,270 589 24,004 132,361 18,245 4-46/N-39 2195700 0 220100 2 31 744 373 1,069 2,181 795 33,124 67,624 24,633 4-50/K-41 2194000 0 220100 8 0 0 0 0 0 0 0 0 0 220100 Endicott Pool Production Totals.......................... 2,073,172 5,233,225 12,202,543 Form 10-405 State of Alaska Run Date: 02/05/97 Alaska Oil and Gas Conservation Commission Run Time: 14:07:47 Monthly Injection Report 20 AAC 25.432 Page 1 BP Exploration (Alaska) Inc. Endicott Operating Area Endicott January, 1997 Tubing Pressure Casing Pressure Daily Average Injection Total Monthly Injection Well API C Field Days Max Average Max Average Liquid Gas Liquid Gas Name Number L & Pool In PSIG PSIG PSIG PSIG BBL MCF BBL MCF 50- S Code Oper. 2-02/P-18 0292156800 D 220036 1 637.00 637.00 0.00 0.00 389 0 389 0 220036 Pool Injection Totals...................... 389 0 1-05/0-20 0292160500 G 220100 31 4,663.00 4,416.03 0.00 0.00 0 77,501 0 2,402,554 _5/P-25 0292236100 G 220100 31 4,663.00 4,416.03 0.00 0.00 0 37,375 0 1,158,638 3/0-15 0292251000 W 220100 31 2,481.00 2,215.10 0.00 0.00 20,030 0 620,954 0 1-37/P-24 0292174800 W 220100 31 2,343.00 2,120.19 0.00 0.00 11,905 0 369,066 0 1-41/0-23 0292171300 W 220100 31 2,263.00 2,042.03 0.00 0.00 15,430 0 478,344 0 1-43/P-26 0292186400 W 220100 31 2,343.00 2,136.39 0.00 0.00 15,305 0 474,467 0 1-51N-20 0292230400 W 220100 31 2,508.00 2,237.32 0.00 0.00 3,018 0 93,582 0 1-69N-19 0292202000 W 220100 31 2,463.00 2,215.77 0.00 0.00 4,094 0 126,936 0 2-06/J-22 0292169900 G 220100 31 4,663.00 4,416.03 0.00 0.00 0 126,257 0 3,913,984 2-12/0-16 0292230200 G 220100 31 4,663.00 4,416.03 0.00 0.00 0 41,079 0 1,273,464 2-16/M-16 0292188500 W 220100 31 2,363.00 2,119.55 0.00 0.00 17,629 0 546,521 0 2-22/L-14 0292193100 W 220100 21 2,168.00 2,094.19 0.00 0.00 16,242 0 341,092 0 2-24/M-12 0292241800 W 220100 30 2,505.00 2,240.93 0.00 0.00 3,164 0 94,949 0 2-30/0-09 0292222800 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 2-34/P-14 0292166200 W 220100 31 2,381.00 2,141.13 0.00 0.00 21,028 0 651,885 0 2-44/R-12 0292176700 W 220100 26 2,510.00 1,913.73 0.00 0.00 6,398 0 166,359 0 2-54/0-12 0292221800 W 220100 31 2,351.00 2,113.39 0.00 0.00 21,669 0 671,751 0 2-64/U-10 0292205500 W 220100 31 2,518.00 2,244.77 0.00 0.00 1,683 0 52,196 0 2-70/U-15 0292189900 W 220100 31 2,540.00 2,262.13 0.00 0.00 2,921 0 90,567 0 .7/N-28 0292191100 W 220100 31 2,306.00 2,065.68 0.00 0.00 17,516 0 543,000 0 1/K-39 0292187800 W 220100 31 2,563.00 2,093.87 0.00 0.00 24,811 0 769,169 0 3-45/M-39 0292181100 W 220100 31 2,463.00 2,182.81 0.00 0.00 6,319 0 195,895 0 3-47/0-35 0292156900 W 220100 31 2,111.00 1,946.52 0.00 0.00 9,411 0 291,756 0 4-04fT -26 0292196800 W 220100 31 2,377.00 2,127.32 0.00 0.00 6,743 0 209,044 0 4-08/P-27 0292169200 W 220100 31 1,792.00 1,641.97 0.00 0.00 10,529 0 326,429 0 4-14/R-34 0292186300 W 220100 31 2,308.00 1,749.19 0.00 0.00 9,948 0 308,407 0 4-40/P-43 0292226500 W 220100 31 2,465.00 2,202.23 0.00 0.00 3,400 0 105,408 0 4-44/M-44 0292225400 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 4-48/K-43 0292197200 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 5-01/SD-07 0292051800 G 220100 31 4,663.00 4,416.03 0.00 0.00 0 72,589 0 2,250,273 5-02/SD-10 0292064000 W 220100 31 2,074.00 1,869.52 0.00 0.00 14,108 0 437,353 0 220100 Pool Injection Totals...................... 7,965,130 10,998,913 Form 10-406 Run Date: 02/05/97 Run Time: 14:07:47 BP Exploration (Alaska) Inc. API C Field Days Number L & Pool In 50- S Code Oper. END Gathering Center Totals.......................................... Well Name State of Alaska Alaska Oil and Gas Conservation Commission Monthly Injection Report 20 AAC 25.432 Endicott Operating Area Endicott Tubing Pressure Casing Pressure Max Average Max Average PSIG PSIG PSIG PSIG Field I njection Total................................................................................ e e Form 10-406 Daily Average Injection liquid Gas BBL MCF r Page 2 January, 1997 Total Monthly Injection liquid Gas BBL MCF 7,965,519 10,998,913 7,965,519 10,998,913 BP EXPLORATION (ALASKA). INC. Name of Operator 1. WELL NO. 2. API NUMBER 3. C 4. FIELD 50- L & POOL S CODE e 029-0000002 P 220100 7 e STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 ENDICOTT PRODUCTION FACILITY GAS LIQUIDS Field and Pool 5 6. DAYS 7. GAS-Oil 8. TUBING METI-f IN RATIO PSIG a:m DAilY AVERAGE PRODUCTION 9. OIL 110. WATER 11. GAS (BPD) (BPD) (MCF) 31 N/A o N/A 4984.4 o ~::::œ~~ 'P;¿-"iI¡ true on' 00'_ to ~, best of my m_ Title: Manager. Volume. Royalty & Severance FORM 10-405 REV 12-1-85 15. Date: '? 7,/11 Jan 1997 Month and Year of Production TOTAL MONTHLY PRODUCTION 12. Oil 113. WATER 14. GAS (BBL) (BBL) (MCF) 154,516 o o TOTAL 154,516 o o SUBMIT IN DUPLICATE BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 February 6, 1997 Alaska Oil & Gas Conservation Commission A TIN: Steve McMains 3001 Porcupine Drive Anchorage, AK 99501-3192 RECEIVED FEB 10 199"7 Alaska Oll & Gas Cons. Commission Enclosed, in duplicate, are the Monthly Production RepdJic~Pfðtfn 10-405), Monthly Injection Report (Form 10-406), Oil Reconciliation Report, and NGL Monthly Production Report covering Sag Delta North for January 1997. A portion of the production from Sag Delta North is being allocated to the Endicott Participating Area. The purpose of this reallocation is to correct an overallocation of production which occurred from December 1994 through May 1995. Please refer to the attached documentation for further details. If you have any questions regarding these reports, please call Anne Fiedler at 564-5826. Sincerely, I!ø! !) II/¡ Paul D. Sly Manager, Volume, Royalty & Severance Enclosures e e Run Date: Run Time: PA OA 02/05/97 14:11:16 SDN END BP Exploration (Alaska) Inc. Oil Movement Accounting & Reporting Alaska Oil and Gas Conservation Commission Oil Reconciliation Report From Date: To Date: 1/1/97 1/31/97 Description Pipeline Deliveries, END Oil Volume 2,249,552 TOTAL PIPELINE DELIVERIES NGL Deliveries, END e TOTAL NGL DELIVERIES Allocation of SLP to EPA Load Diesel, SDN Upstream Losses, SON Downstream Losses, SDN TOTAL FIELD PRODUCTION » iü CI) Š e g " ;:::0 Qo ÏI1 I"T1 :boG') OJ ~~ -..1 ("') ;¡;O 0 ,.,., CQ~ - (I> < -... < C") <.C 0 <.C ::¡ --J ,..." § ¡;; 0 {.I> ö ~ ~ $I) en i\r g " ;;:0 ~ f'T1 r-n :J::oG') OJ =n> ("') §..cn ~ 0(") r-r¡ t;j C) 0 <:::¡:::J - CD ¡:n --' < (") <.C 0 c..c> 3 -.¡ m :3 00' 0 en õ' ~ hereby certify that the foregoing is true and correct to the best of my knowledge. Signed: PMl f). Pi¡ Tnle: N.fjI.. r/tL, t2<¥{ :>!V. Page 1 2,249,552 -154,660 -154,660 -2,073,228 o o o 21,664 Date: Report # SUM DUD - 05 . '2.7.17 SDN Pay Back of Overallocated Production Background - SDN was overallocated production between 12/94 and 5/95. Sag Delta's reported values were too high which made Endicott's too low. Revised reports for those 6 months were distributed in October, 1995 but then retracted in March, 1996 because they reallocated production that had already been delivered to owners. The corrections could not be made retroactively. Solution - SDN will pay back Endicott, in three installments, over the next three months. This month, SDN production has been intentionally reduced by 1/3 the amount owed which amounts in a pay back to Endicott of the same amount. Details are below. SDN Allocation originally taken Oil (bbls) Ngl (bbls) Gas (mset) Water (bbls) Dec-94 30,222 583 42,899 317,942 Jan-95 13,838 141 10,693 335,955 Feb-95 4,142 64 4,731 177,980 Mar-95 29,253 254 19,012 286,728 Apr-95 20,879 179 13,120 293,449 May-95 34,998 151 21,900 320,813 Total 133,332 1,372 112,355 1,732,867 SDN Allocation should have been Oil (bbls) Ngl (bbls) Gas (mset) Water (bbls) Dec-94 26,760 225 16,976 273,194 Jan-95 10,914 94 6,934 231,802 Feb-95 3,821 36 2,407 107,612 Mar-95 26,353 223 16,551 261,907 Apr-95 20,245 175 12,719 - 272,943 May-95 34,740 151 21,737 312,487 Total 122,833 904 77,324 1,459,945 SDN Overallocation - To be paid back in thirds Oct, Nov, Dec 1996 (extended to Jan 1997) Oil (bbls) Ngl (bbls) Gas (mset) Water (bbls) Dec-94 3,462 358 25,923 44,748 Jan-95 2,924 47 3,759 104,153 Feb-95 321 28 2,324 70,368 Mar-95 2,900 31 2,461 24,821 Apr-95 634 4 401 20,506 May-95 258 0 163 8,326 Total 10,499 468 35,031 272,922 SON owes EPA (10,499) (468) (35,031 ) (272,922) Sum pay back for 10/96-1/97 0 0 0 o I PAY BACK IS COMPLETE SDN Pay Back Oil (bbls) Ngl (bbls) Gas (mset) Water (bbls) 23,716 174 14,848 173,771 Real allocation for SDN 10/96 (3,500) (156) (11,677) (90,974) Less 1/3 total SDN owes EPA 20,216 18 3,171 82,797 Reported allocation for SDN 10/96 25,096 176 15,714 167,815 Real allocation for SDN 11/96 (3,500) (156) (11,677) (90,974) Less 1/3 total SDN owes EPA 21,596 20 4,037 76,841 Reported allocation for SDN 11/96 15,043 123 9,419 130,237 Real allocation for SDN 12/96 (3,499) ( 123) (9,419) (90,974) Pay back· not enough 091 & gas to complete 11,544 0 0 39,263 Reported allocation for SDN 12/96 _21,664 177 13,564 180,357 Real allocation for SDN 1/97 0 (33) (2,258) o Pay back last 091 & gas 21,664 144 11,306 180,357 Reported allocation for SDN 1/97 e e BP EXPLORATION (ALASKA) INC. WELL PRODUCTION WELL 1-17/SAG DELTA #2 JANUARY 1997 1 0 0 0 0 0 0.00 0 0 2 ,0 0 0 0 0 0.00 0 0 3 0 0 0 0 0 0.00 0 0 4 0 0 0 0 0 0.00 0 0 5 0 0 0 0 0 0.00 0 0 6 0 0 0 0 0 0.00 0 0 7 0 0 0 0 0 0.00 0 0 e 8 0 0 0 0 0 0.00 0 0 9 0 0 0 0 0 0.00 0 0 10 0 0 0 0 0 0.00 0 0 11 0 0 0 0 0 0.00 0 0 12 0 0 0 0 0 0.00 0 0 13 0 0 0 0 0 0.00 0 0 14 0 0 0 0 0 0.00 0 0 15 0 0 0 0 0 0.00 0 0 16 0 0 0 0 0 0.00 0 0 17 0 0 0 0 0 0.00 0 0 18 0 0 0 0 0 0.00 0 0 19 0 0 0 0 0 0.00 0 0 20 0 0 0 0 0 0.00 0 0 21 0 0 0 0 0 0.00 0 0 22 0 0 0 0 0 0.00 0 0 23 0 0 0 0 0 0.00 0 0 24 0 0 0 0 0 0.00 0 0 25 0 0 0 0 0 0.00 0 0 26 0 0 0 0 0 0.00 0 0 e 27 0 0 0 0 0 0.00 0 0 28 0 0 0 0 0 0.00 0 0 29 0 0 0 0 0 0.00 0 0 30 0 0 0 0 0 0.00 0 0 31 0 0 0 0 0 0.00 0 0 _i'r~r ~!! 1: r .. Plugged and abandoned 1/24/97. Not Involved in pay back. BP EXPLORATION (ALASKA) INC. WELL PRODUCTION WELL 2-321SAG DELTA #3 JANUARY 1997 ~ It; m._MI~~~.~i~~ [r¡ TIlI:nnl~í.f~t :F~~~"~=,., All 1 344 2 215 920 0 24.00 291 122 2 ;342 2 214 924 0 24.00 295 122 3 339 2 212 929 0 24.00 298 122 4 337 2 211 934 0 24.00 299 123 5 334 2 209 939 0 24.00 299 123 6 332 2 208 944 0 24.00 307 123 7 330 3 207 940 0 24.00 301 123 e 8 328 3 206 935 0 24.00 296 123 9 327 3 205 930 0 24.00 299 123 10 325 3 204 925 0 24.00 303 123 11 323 3 202 921 0 24.00 299 123 12 322 3 201 916 0 24.00 296 119 13 320 3 200 911 0 24.00 293 121 14 319 3 199 907 0 24.00 304 123 15 297 3 186 871 0 22.80 300 124 16 306 3 192 927 0 24.00 293 124 17 300 3 188 937 0 24.00 294 123 18 294 2 184 947 0 24.00 299 123 19 288 2 180 957 0 24.00 300 123 20 282 2 176 967 0 24.00 296 123 21 276 3 173 977 0 24.00 306 123 22 276 3 173 977 0 24.00 293 123 23 276 2 173 977 0 24.00 290 123 24 276 2 173 977 0 24.00 295 122 25 276 2 173 977 0 24.00 296 122 26 276 2 173 977 0 24.00 297 122 e 27 276 2 173 977 0 24.00 296 122 28 276 2 173 977 0 24.00 294 122 29 276 2 173 978 0 24.00 292 122 30 262 2 164 931 0 22.83 299 124 31 276 2 173 978 0 24.00 301 123 1II&"FJlill " LI¡IF~"¡"'t'I5Y"]Äfj\""I!~~r-rT l!~ ÍlI,"' Not involved in pay back this month. BP EXPLORATION (ALASKA) INC. WELL PRODUCTION WELL 2-38/SAG DELTA #1 JANUARY 1997 ~: ~ '~i¡i! -~~4!i. REAL JANUARY 97 ALLOCATION (B.EFORE PAY BACK)* ',I.L~ OIL NGL GAS wrR ,... fL... JL. lW, ._ ,,' 1 130 0 7 3,129 0 24.00 734 158 130 1 82 3129 2 1,30 1 7 3,129 0 24.00 742 158 130 2 82 3129 3 189 0 43 5,062 0 24.00 351 173 189 1 118 5062 4 219 1 62 3,540 0 16.23 310 176 219 2 137 3540 5 337 2 136 5,251 0 24.00 310 174 337 3 211 5251 6 351 2 144 5,268 0 24.00 310 176 351 3 219 5268 7 364 2 153 5,286 0 24.00 308 176 364 3 228 5286 e 8 377 2 161 5,303 0 24.00 300 176 377 3 236 5303 9 391 2 170 5,320 0 24.00 295 176 391 3 245 5320 10 404 2 178 5,337 0 24.00 299 176 404 3 253 5337 11 335 2 135 4,290 0 19.23 294 176 335 3 210 4290 12 0 0 0 0 0 0.00 0 0 0 0 0 0 13 371 2 157 4,491 0 20.00 298 168 371 3 232 4491 14 458 2 212 5,406 0 24.00 293 174 458 3 287 5406 15 447 3 205 5,145 0 22.77 308 174 447 4 280 5145 16 462 2 214 5,436 0 24.00 292 175 462 3 289 5436 17 452 3 208 5,449 0 24.00 293 176 452 4 283 5449 18 443 3 202 5,462 0 24.00 296 176 443 4 277 5462 19 433 2 196 5,474 0 24.00 296 176 433 3 271 5474 20 424 2 190 5,487 0 24.00 293 176 424 3 265 5487 21 414 3 184 5,500 0 24.00 303 176 414 4 259 5500 22 433 3 196 5,453 ·0 24.00 293 176 433 4 271 5453 23 453 3 209 5,407 0 24.00 287 176 453 4 284 5407 24 472 3 220 5,360 0 24.00 291 176 472 4 296 5360 25 492 3 232 5,314 0 24.00 294 176 492 4 308 5314 26 511 3 244 5,267 0 24.00 294 176 511 4 320 5267 e 27 531 3' 256 5,220 0 24.00 292 176 531 4 332 5220 28 550 4 268 5,174 0 24.00 290 176 550 5 344 5174 29 570 3 281 5,128 0 24.00 305 176 570 5 357 5128 30 540 3 262 4,857 0 22.73 299 176 540 5 338 4857 31 570 3 281 5,128 0 24.00 297 176 570 5 357 5128 _~OOL mm ~~ u~.L~.r~·' ,.,.! \II. m!T* ~.1I6j 12,253 102 7,671 151,073 FBJLœ) 0 (33) (2,258) 0 * SDN was overallocated production between 12/94 and 5/95. The volumes will be paid back between 10/96 and 1197. This completes the pay back. BP EXPLORATION (ALASKA). INC. Name of Operator STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 SAG DELTA NORTH PRODUCTION FACILITY GAS LIQUIDS Field and Pool 1. WELL 2. API NUMBER C 4. FIELD 6. DAYS 7. GAS-OIL 8. TUBING DAILY AVERAGE PRODUCTION NO. 50- L & POOL METl-I IN RATIO PSIG 9. OIL 110. WATER 11. GAS S CODE ŒtR (BPD) (BPD) (MCF) . 029-0000006 P 220150 7 31 N/A N/A 4.6 0 0 e I hereby certify that the foregoing is true and correct to the best of my knowledge Signed: {f¡¡d 0. e!!¡ 15. Title: Manager. Volume. Royalty & Severance Date: '2.7,"7 TOTAL FORM 10-405 REV 12-1-85 Jan 1997 Month and Year of Production TOTAL MONTHLY PRODUCTION 12. OIL 113. WATER 14. GAS (BBL) (BBL) (MCF) 144 o o 144 o o SUBMIT IN DUPLICATE Run Date: 02/05/97 Run Time: 14:06:10 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Production Report BP Exploration (Alaska) Inc. Well API C Field M Days Gas-Oil Name Number L & Pool T In Ratio 50- S Code H Oper. 1-17/SN-02 2210000 0 220150 8 0 0 2-321SN-03 2208400 0 220150 2 31 626 2-38/SN-01 2209000 0 220150 2 30 442 _0150 Sag Delta North Pool Production Totals.......................... e Form 10-405 20 MC 25.230 Endicott Operating Area Daily Average Production Oil Water Gas BBL BBL MCF Tubing PSIG o 297 329 o 304 408 o 945 5,036 o 190 180 Page 3 January, 1997 Total Monthly Production Oil Water Gas BBL BBL MCF o 9,411 12,253 21,664 o 29,284 151,073 o 5,893 5,413 180,357 11,306 Run Date: 02/05/97 Run Time: 14:09:54 BP Exploration (Alaska) Inc. API C Field Number l & Pool 50- S Code 1-11/SN-04 0292210700 W 220150 5-03/SD-09 0292063900 W 220150 220150 Pool Injection Totals...................... Well Name eo Gathering Center Totals.......................................... Days In Oper. 31 31 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Injection Report 20 AAC 25.432 Endicott Operating Area Sag Delta North Unit Tubing Pressure Casing Pressure Daily Average Injection Max Average Max Average liquid Gas PSIG PSIG PSIG PSIG BBl MCF 2,389.00 1,716.00 2,177.16 1,628.13 0.00 0.00 0.00 0.00 4,775 3,551 Field I njection Total................................................................................ e Form 10-406 . . Page 1 January, 1997 Total Monthly Injection liquid Gas BBl MCF o o 148,029 110,083 258,112 o o o 258,112 o 258,112 o Run Date: Run Time: PA OA 03/06/97 09:27:26 EPA END BP Exploration (Alaska) Inc. Oil Movement Accounting & Reporting Alaska Oil and Gas Conservation Commission Oil Reconciliation Report From Date: To Date: 2/1/97 2/28/97 Description Pipeline Deliveries, END Oil Volume 1,960,994 TOTAL PIPELINE DELIVERIES 1,960,994 NGL Deliveries, END -140,973 e TOTAL NGL DELIVERIES -140,973 Allocation of SLP to SON -21,679 Load Diesel, EPA -21 Upstream Losses, EPA 0 Downstream Losses, EPA 0 TOTAL FIELD PRODUCTION 1,798,321 e ~i::~:Y certi~ that the foregoing if;ip~~O the best OfT:~ekn::.g~~ I /by ,~ Page 1 Date: o/r /'1 . Report # SUMDUD - 05 State of Alaska Run Date: 03/06/97 Alaska Oil and Gas Conservation Commission Run Time: 09:24:04 Monthly Production Report 20 AAC 25.230 Page 1 BP Exploration (Alaska) Inc. Endicott Operating Area February, 1997 Daily Average Production Total Monthly Production Well API C Field M Days Gas-Oil Tubing Oil Water Gas Oil Water Gas Name Number L & Pool T In Ratio PSIG BBL BBL MCF BBL BBL MCF 50- S Code H Oper. 1-01/J-19 2180100 0 220100 1 28 6,339 531 1,968 1,017 12,471 55,090 28,485 349,199 1-03/P-16 2260100 0 220100 1 28 12,690 2,573 1,937 2,445 24,579 54,234 68,446 688,215 1-09/J-18 2174300 0 220100 8 0 0 0 0 0 0 0 0 0 1-19/1-18 2256900 0 220100 1 28 10,758 774 1 ,438 8,905 15,468 40,261 249,327 433,110 _1/K-25 2200500 0 220100 8 0 0 0 0 0 0 0 0 0 5/N-22 2172200 0 220100 1 13 16,349 2,747 1,036 224 16,937 13,467 2,912 220,175 1-27/P-20 2169300 0 220100 1 28 8,507 1,598 2,380 4,135 20,244 66,629 115,781 566,842 1-29/M-25 2166900 0 220100 1 28 4,513 555 2,121 2,771 9,572 59,392 77,597 268,009 1-31/M-21 2256200 0 220100 1 27 1,104 464 564 4,655 623 15,232 125,686 16,821 1-33/M-23 2257700 0 220100 1 21 772 298 303 2,861 234 6,370 60,089 4,916 1-35/0-25 2167200 0 220100 1 28 11 ,888 2,214 865 591 10,287 24,230 16,552 288,040 1-39/P-17 2182700 0 220100 2 28 8,143 1,283 1,377 7,462 11,215 38,564 208,943 314,032 1-45/0-26 2199100 0 220100 8 0 0 0 0 0 0 0 0 0 1-47/0-21 2162500 0 220100 8 0 0 0 0 0 0 0 0 0 1-49/P-21 2184100 0 220100 1 19 2,474 410 263 6,451 650 4,994 122,567 12,354 1-55/R-25 2178800 0 220100 8 0 0 0 0 0 0 0 0 0 1-57/R-23 2187300 0 220100 8 0 0 0 0 0 0 0 0 0 1-61/0-20 2252000 0 220100 1 28 9,303 1,401 1,972 9,709 18,350 55,228 271,840 513,792 1-63fT-22 2190500 0 220100 1 19 8,361 1,107 2,822 3,083 23,593 53,613 58,574 448,275 1-65/N-25 2262700 0 220100 1 28 9,473 2,388 1,505 1,907 14,255 42,134 53,384 399,153 1-67fT-20 2198500 0 220100 1 4 6,750 472 238 6,601 1,607 952 26,402 6,426 2-04/M-19 2158500 0 220100 1 28 3,291 341 1,932 3,675 6,358 54,090 102,910 178,010 .8/K-16 2177100 0 220100 2 11 1,638 311 315 6,860 517 3,468 75,464 5,682 4/0-16 2163900 0 220100 1 28 4,856 451 3,889 8,695 18,885 108,898 243,453 528,767 2-18/L-16 2203200 0 220100 1 28 5,863 401 2,541 8,425 14,897 71,148 235,888 417,128 2-20/L-15 2204800 0 220100 2 28 3,117 291 314 82 979 8,798 2,292 27,420 2-26/N-14 2181500 0 220100 2 7 692 330 6 537 4 39 3,760 27 2-28/P-19 2184700 0 220100 1 28 2,766 483 1,779 8,431 4,920 49,803 236,076 137,762 2-36/0-14 2201400 0 220100 1 28 8,907 914 3,012 6,696 26,827 84,332 187,476 751,161 2-40/S-22 2252700 0 220100 8 0 0 0 0 0 0 0 0 0 2-42/P-13 2189200 0 220100 1 14 5,609 287 184 15 1,033 2,579 215 14,465 2-46A/R-10 2192101 0 220100 1 17 2,956 1,025 702 2,634 2,076 11,938 44,785 35,284 2-48/0-13 2261200 0 220100 1 28 7,652 2,490 3,367 1,723 25,769 94,289 48,246 721,519 2-50/U-08 2236700 0 220100 2 28 2,486 362 1,008 1,986 2,507 28,236 55,618 70,193 2-52/S-14 2175000 0 220100 1 13 13,977 2,313 1,087 994 15,197 14,135 12,925 197,559 2-58/S-09 2204100 0 220100 2 27 1 0,404 340 504 529 5,244 13,608 14,281 141,583 2-60/U-13 2237500 0 220100 2 28 729 275 686 1,009 500 19,219 28,256 14,007 Form 1 0-405 State of Alaska Run Date: 03/06/97 Alaska Oil and Gas Conservation Commission Run Time: 09:24:04 Monthly Production Report 20 AAC 25.230 Page 2 BP Exploration (Alaska) Inc. Endicott Operating Area February, 1997 Daily Average Production Total Monthly Production Well API C Field M Days Gas-Oil Tubing Oil Water Gas Oil Water Gas Name Number L & Pool T In Ratio PSIG BBL BBL MCF BBL BBL MCF 50- S Code H Oper. 2-62/0-17 2164800 0 220100 8 0 0 0 0 0 0 0 0 0 2-68/S-17 2185800 0 220100 8 0 0 0 0 0 0 0 0 0 3-01/N-29 2167800 0 220100 8 0 0 0 0 0 0 0 0 0 3-03/J-33 2230600 0 220100 1 19 21,923 1,985 530 47 11,614 10,066 884 220,672 _5/0-29 2162400 0 220100 2 28 2,817 341 523 1,259 1,473 14,638 35,239 41 ,231 9/L-28A 2178001 0 220100 1 28 1,862 461 3,831 4,799 7,133 1 07,278 134,377 199,733 3-11/M-30 2184800 0 220100 2 28 1,320 368 1,757 4,588 2,319 49,190 128,460 64,919 3-15/K-33 2175100 0 220100 1 28 8,140 1,237 5,018 10,040 40,849 140,517 281,111 1,143,768 3-17/J-30A 2194601 0 220100 8 0 0 0 0 0 0 0 0 0 3-19/R-28 2246300 0 220100 8 0 0 0 0 0 0 0 0 0 3-21/L-34 2171400 0 220100 2 28 963 388 642 6,670 618 17,981 186,751 17,316 3-23/N-32 2164500 0 220100 8 0 0 0 0 0 0 0 0 0 3-25/M-27 2212500 0 220100 2 28 9,712 532 890 1,956 8,646 24,927 54,760 242,081 3-27/M-33 2158600 0 220100 2 28 759 360 1,234 5,137 937 34,549 143,846 26,224 3-29/J-32 2210600 0 220100 1 28 973 378 2,562 5,455 2,492 71,724 152,740 69,777 3-33/K-37 2166800 0 220100 2 22 715 324 182 3,286 130 4,000 72,301 2,861 3-35/L-36 2170100 0 220100 2 1 773 369 22 143 17 22 143 17 3-37/L-35 2255400 0 220100 1 28 761 347 404 2,189 307 11,312 61,278 8,605 3-39/J-39 2176400 0 220100 8 0 0 0 0 0 0 0 0 0 3-43/P-36 2241600 0 220100 8 0 0 0 0 0 0 0 0 0 3-49/J-40 2173500 0 220100 8 0 0 0 0 0 0 0 0 0 4-02/0-28 2178900 0 220100 1 28 15,680 1,051 1,170 1,892 18,352 32,772 52,962 513,866 ø6A/O-30 2172301 0 220100 2 28 1,240 499 906 3,174 1,123 25,360 88,876 31 ,450 0/M-28 2246400 0 220100 1 28 9,367 2,434 3,098 124 29,016 86,733 3,483 812,449 4-18/S-30 2189600 0 220100 8 0 0 0 0 0 0 0 0 0 4-20/M-35 2164001 0 220100 2 16 747 332 296 2,647 221 4,732 42,354 3,536 4-26/0-34 2183500 0 220100 2 4 806 388 8 1,513 6 31 6,053 25 4-28/N-37 2187000 0 220100 8 0 0 0 0 0 0 0 0 0 4-32/K-38 2255900 0 220100 1 28 736 328 376 2,804 277 10,533 78,510 7,750 4-34/0-38 2270500 0 220100 1 23 775 1,126 246 4,394 191 5,669 101,055 4,391 4-38/K-34 2248200 0 220100 8 0 0 0 0 0 0 0 0 0 4-42/P-38 2173100 0 220100 2 28 667 345 814 3,990 543 22,790 111,711 15,199 4-46/N-39 2195700 0 220100 2 28 731 393 1,019 1,848 744 28,527 51,754 20,843 4-50/K-41 2194000 0 220100 8 0 0 0 0 0 0 0 0 0 220100 Endicott Pool Production Totals.......................... 1,798,321 4,566,878 11,216,639 Form 10-405 State of Alaska Run Date: 03/06/97 Alaska Oil and Gas Conservation Commission Run Time: 09:22:22 Monthly Injection Report 20 MC 25.432 Page 1 BP Exploration (Alaska) Inc. Endicott Operating Area Endicott February, 1997 Tubing Pressure Casing Pressure Daily Average Injection Total Monthly Injection Well API C Field Days Max Average Max Average Liquid Gas Liquid Gas Name Number L & Pool In PSIG PSIG PSIG PSIG BBL MCF BBL MCF 50- S Code Oper. 2-02/P-18 0292156800 D 220036 2 1,187.00 989.50 0.00 0.00 639 0 1,279 0 220036 Pool Injection Totals...................... 1,279 0 1-05/0-20 0292160500 G 220100 28 4,689.00 4,428.18 0.00 0.00 0 86,844 0 2,431,635 .5/P-25 0292236100 G 220100 28 4,689.00 4,428.18 0.00 0.00 0 36,091 0 1,010,572 3/0-15 0292251000 W 220100 28 2,254.00 2,021.18 0.00 0.00 17,355 0 485,943 0 1-37/P-24 0292174800 W 220100 28 2,161.00 1,956.18 0.00 0.00 10,107 0 282,998 0 1-41/0-23 0292171300 W 220100 28 2,060.00 1,875.29 0.00 0.00 14,086 0 394,426 0 1-43/P-26 0292186400 W 220100 28 2,167.00 1,971.00 0.00 0.00 12,309 0 344,662 0 1-51N-20 0292230400 W 220100 28 2,280.00 2,038.86 0.00 0.00 2,632 0 73,715 0 1-69N-19 0292202000 W 220100 28 2,221.00 2,000.32 0.00 0.00 3,178 0 88,998 0 2-06/J-22 0292169900 G 220100 28 4,689.00 4,428.18 0.00 0.00 0 129,489 0 3,625,692 2-12/0-16 0292230200 G 220100 28 4,689.00 4,428.18 0.00 0.00 0 44,516 0 1,246,474 2-16/M-16 0292188500 W 220100 28 2,151.00 1,939.29 0.00 0.00 15,475 0 433,308 0 2-22/L-14 0292193100 W 220100 28 2,192.00 1,976.96 0.00 0.00 14,786 0 414,026 0 2-24/M-12 0292241800 W 220100 28 2,273.00 2,033.54 0.00 0.00 2,660 0 74,488 0 2-30/0-09 0292222800 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 2-34/P-14 0292166200 W 220100 28 2,179.00 1,965.79 0.00 0.00 18,459 0 516,857 0 2-44/R-12 0292176700 W 220100 20 2,284.00 2,112.30 0.00 0.00 3,465 0 69,311 0 2-54/0-12 0292221800 W 220100 28 2,149.00 1,938.54 0.00 0.00 20,051 0 561 ,440 0 2-64/U-10 0292205500 W 220100 28 2,287.00 2,044.29 0.00 0.00 1,229 0 34,425 0 2-70/U-15 0292189900 W 220100 22 2,304.00 2,161.59 0.00 0.00 2,455 0 54,016 0 _7/N-28 0292191100 W 220100 28 2,086.00 1,904.82 0.00 0.00 17,107 0 479,001 0 1/K-39 0292187800 W 220100 28 2,097.00 1,911.25 0.00 0.00 24,085 0 674,380 0 3-45/M-39 0292181100 W 220100 28 2,208.00 2,002.79 0.00 0.00 5,499 0 153,993 0 3-47/0-35 0292156900 W 220100 28 2,117.00 1,923.36 0.00 0.00 9,753 0 273,100 0 4-04fT-26 0292196800 W 220100 27 2,151.00 1,972.00 0.00 0.00 5,376 0 145,165 0 4-08/P-27 0292169200 W 220100 28 1,763.00 1,643.54 0.00 0.00 10,843 0 303,629 0 4-14/R-34 0292186300 W 220100 28 1,855.00 1 ,702.11 0.00 0.00 9,242 0 258,791 0 4-40/P-43 0292226500 W 220100 28 2,218.00 2,019.79 0.00 0.00 2,861 0 80,122 0 4-44/M-44 0292225400 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 4-48/K-43 0292197200 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 5-01/SD-07 0292051800 G 220100 28 4,689.00 4,428.18 0.00 0.00 0 65,098 0 1,822,749 5-02/SD-10 0292064000 W 220100 28 1,875.00 1,718.25 0.00 0.00 12,417 0 347,678 0 220100 Pool Injection Totals...................... 6,544,472 10,137,122 Form 10-406 Run Date: 03/06/97 Run Time: 09:22:22 BP Exploration (Alaska) Inc. API C Field Days Number L & Pool In 50- S Code Oper. END Gathering Center Totals.......................................... Well Name State of Alaska Alaska Oil and Gas Conservation Commission Monthly Injection Report 20 AAC 25.432 Endicott Operating Area Endicott Tubing Pressure Casing Pressure Max Average Max Average PSIG PSIG PSIG PSIG Field Injection Total.... ....... ................................................' ,................... e e Form 10-406 Daily Average Injection Liquid Gas BBL MCF Page 2 February, 1997 Total Monthly Injection Liquid Gas BBL MCF 6,545,751 10,137,122 6,545,751 10,137,122 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 MC 25.230 BP EXPLORATION (ALASKA), INC. Name of Operator ENDICOTT PRODUCTION FACILITY GAS LIQUIDS Field and Pool 1. WELL NO. 2. API NUMBER 3. C 4. FIELD 5 6. DAYS 7. GAS-OIL 8. TUBING DAILY AVERAGE PRODUCTION 50- L & POOL MET - IN RATIO PSIG 9. OIL 110. WATER ". GAS S CODE OPER (BPD) (BPD) (MCF) 029-0000002 P 220100 7 28 N/A N/ A 5028.3 o o e e , he'eby c","fy ~lJ the lo",go'og ";;Z ;Od cwed to the""" 01 my 'oo,",edge Signed: ¡/rud ¡}. fJtI I 15. Title: Manager, Volume, Royalty & Severance Date: 3. 7117 TOTAL 140,791 o FORM 10-405 REV 12- 1-85 Feb 1997 Month and Year of Production TOTAL MONTHLY PRODUCTION 12. OIL 113. WATER 14. GAS (BBL) (BBL) (MCF) 140,791 o o o SUBMIT IN DUPLICATE Run Date: Run Time: PA OA 03/06/97 09:21 :40 SDN END BP Exploration (Alaska) Inc. Oil Movement Accounting & Reporting Alaska Oil and Gas Conservation Commission Oil Reconciliation Report From Date: To Date: 2/1/97 2/28/97 Description Pipeline Deliveries, END TOTAL PIPELINE DELIVERIES Oil Volume 1,960,994 1,960,994 NGL Deliveries, END -140,973 e TOTAL NGL DELIVERIES -140,973 Allocation of SLP to EPA -1,798,342 Load Diesel, SON 0 Upstream Losses, SON 0 Downstream Losses, SON 0 TOTAL FIELD PRODUCTION 21,679 e I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed: Paul!l ~ Title: hq Vœ., /Wf { ~. Page 1 Date: Report # SUM DUD - 05 3.71/7 Run Date: 03/06/97 Run Time: 09:24:04 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Production Report BP Exploration (Alaska) Inc. Well API C Field M Days Gas-Oil Name Number L & Pool T In Ratio 50- S Code H Oper. 2-32/SN-03 2208400 0 220150 2 28 625 2-38/SN-01 2209000 0 220150 2 28 626 220150 Sag Delta North Pool Production Totals.......................... e e Form 10-405 20 AAC 25.230 Endicott Operating Area Daily Average Production Oil Water Gas BBL BBL MCF Tubing PSIG 297 303 855 4,730 301 473 188 296 Page 3 February, 1997 Total Monthly Production Oil Water Gas BBL BBL MCF 8,429 13,250 23,941 132,426 5,271 8,294 21,679 13,565 156,367 ~ Run Date: 03/06/97 Run Time: 09:17:16 BP Exploration (Alaska) Inc. API C Field Number L & Pool 50- S Code 1-11/SN-04 0292210700 W 220150 5-03/SD-09 0292063900 W 220150 220150 Pool Injection Totals...................... Well Name eo Gathering Center Totals.......................................... Days In Oper. 28 28 :s-.¡:;.J '.. State of Alaska Alaska Oil and Gas Conservation Commission Monthly Injection Report 20 MC 25.432 Endicott Operating Area Sag Delta North Unit Tubing Pressure Casing Pressure Daily Average Injection Max Average Max Average Liquid Gas PSIG PSIG PSIG PSIG BBL MCF 2,151.00 1,729.00 1,978.21 1,584.82 0.00 0.00 0.00 0.00 3,789 3,450 Field Injection Total................ ................................................................ e Form 10-406 .j> .. Page 1 February, 1997 Total Monthly Injection Liquid Gas BBL MCF o o 106,103 96,603 202,706 o o o 202,706 o 202,706 o STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 MC 25.230 BP EXPLORATION (ALASKA), INC. Name of Operator SAG DELTA NORTH PRODUCTION FACILITY GAS LIQUIDS Feb 1997 Field and Pool Month and Year of Production 1. WELL 2. API NUMBER C 4. FIELD 6. DAYS 7. GAS-OIL 8. TUBING DAILY AVERAGE PRODUCTION NO. 50- L & POOL METI- IN RATIO PSIG 9. OIL 110. WATER 11. GAS S CODE OPER (BPD) (BPD) (MCF) 029-0000006 P 220150 7 28 N/A N/A 6.5 0 0 e e ~~:::~~~¡; ;iT/Fij ood emceet to ~e be. of my koow~dge Title: Manager, Volume, Royalty & Severance Date: 3. 7.47 FORM 10-405 REV 12- 1-85 15. TOTAL TOTAL MONTHLY PRODUCTION 12. OIL 113. WATER 114. GAS (BBL) (BBL) (MCF) 182 o o 182 o o SUBMiT IN DUPliCATE Run Date: Run Time: PA OA 04/03/97 13:26:24 EPA END BP Exploration (Alaska) Inc. Oil Movement Accounting & Reporting Alaska Oil and Gas Conservation Commission Oil Reconciliation Report Report # SUMDUD - 05 . From Date: To Date: 3/1/97 3/31/97 Description Pipeline Deliveries, END Oil Volume 2,153,711 TOTAL PIPELINE DELIVERIES 2,153,711 NGL Deliveries, END -147,862 e TOTAL NGL DELIVERIES -147,862 Allocation of SLP to SON -27,828 Load Diesel, EPA 0 Upstream Losses, EPA 0 Downstream Losses, EPA 0 TOTAL FIELD PRODUCTION 1,978,021 e I hereby certify that the foregoing is true and correct to the best of my knowledge. Pud IJ. ÞJ¡ Signed: 1W~I.. VOl, ~IJY d S:w. Title: f//?7 Date: Page 1 State of Alaska Run Date: 04/03/97 Alaska Oil and Gas Conservation Commission Run Time: 13:49: 18 Monthly Production Report 20 MC 25.230 Page 1 BP Exploration (Alaska) Inc. Endicott Operating Area March, 1997 Daily Average Production Total Monthly Production Well API C Field M Days Gas-Oil Tubing Oil Water Gas Oil Water Gas Name Number L & Pool T In Ratio PSIG BBL BBL MCF BBL BBL MCF 50- S Code H Oper. 1-01/J-19 2180100 0 220100 1 31 6,891 539 1,853 1,105 12,769 57,446 34,267 395,843 1-03/P-16 2260100 0 220100 1 24 14,306 1,997 1,314 1,749 18,793 31,527 41,982 451,040 1-09A/L-21 2174301 0 220100 1 6 1,084 398 4,533 2,390 4,913 27,196 14,338 29,475 1-17A/1-17 2210001 0 220100 2 26 1,086 658 2,331 518 2,531 60,612 13,472 65,806 .9/1-18 2256900 0 220100 1 23 10,348 802 1,586 9,649 16,410 36,474 221,933 377,420 -21/K-25 2200500 0 220100 8 0 0 0 0 0 0 0 0 0 1-25/N-22 2172200 0 220100 1 9 13,680 2,701 1,354 146 18,521 12,185 1,315 166,692 1-27/P-20 2169300 0 220100 1 31 8,422 1,302 2,852 5,483 24,021 88,419 169,978 744,642 1-29/M-25 2166900 0 220100 1 31 5,477 527 2,706 2,892 14,823 83,899 89,640 459,509 1-31/M-21 2256200 0 220100 1 31 805 423 922 4,767 743 28,593 147,771 23,026 1-33/M-23 2257700 0 220100 1 31 777 295 383 3,210 298 11,873 99,516 9,226 1-35/0-25 2167200 0 220100 1 30 14,563 2,317 740 579 10,776 22,198 17,363 323,275 1-39/P-17 2182700 0 220100 2 31 13,077 1,267 861 9,062 11 ,260 26,693 280,934 349,067 1-45/0-26 2199100 0 220100 8 0 0 0 0 0 0 0 0 0 1-47/0-21 2162500 0 220100 8 0 0 0 0 0 0 0 0 0 1-49/P-21 2184100 0 220100 1 31 1,350 410 389 7,688 524 12,044 238,332 16,255 1-55/R-25 2178800 0 220100 8 0 0 0 0 0 0 0 0 0 1-57/R-23 2187300 0 220100 8 0 0 0 0 0 0 0 0 0 1-61/0-20 2252000 0 220100 1 31 7,523 1,536 1,820 9,593 13,691 56,419 297,386 424,422 1-63ff -22 2190500 0 220100 1 31 10,254 1,522 2,373 2,292 24,335 73,567 71,045 754,385 1-65/N-25 2262700 0 220100 1 31 9,840 2,412 1 ,493 1,891 14,690 46,277 58,622 455,376 1-67 ff -20 2198500 0 220100 1 2 1,969 629 32 3,385 63 64 6,770 126 _4/M-19 2158500 0 220100 1 31 4,088 359 2,156 4,087 8,814 66,841 126,701 273,241 8/K-16 2177100 0 220100 2 31 732 292 510 2,349 373 15,821 72,806 11,578 2-14/0-16 2163900 0 220100 1 31 4,887 457 4,037 8,247 19,730 125,159 255,667 611,631 2-18/L-16 2203200 0 220100 1 31 5,997 394 2,402 8,535 14,405 74,458 264,592 446,558 2-20/L -15 2204800 0 220100 2 31 3,181 289 315 82 1,002 9,761 2,530 31,048 2-26/N-14 2181500 0 220100 8 0 0 0 0 0 0 0 0 0 2-28/P-19 2184700 0 220100 1 31 1,168 391 2,416 8,118 2,823 74,903 251,671 87,510 2-36/0-14 2201400 0 220100 1 28 14,329 1,190 2,056 5,545 29,456 57,558 155,247 824,775 2-40/S-22 2252700 0 220100 8 0 0 0 0 0 0 0 0 0 2-42/P-13 2189200 0 220100 1 4 6,028 289 97 8 585 388 31 2,339 2-46A/R-1 0 2192101 0 220100 1 18 1,768 704 362 3,267 641 6,523 58,810 11 ,533 2-48/0-13 2261200 0 220100 1 31 8,786 2,467 2,904 1,840 25,515 90,027 57,035 790,971 2-50/U-08 2236700 0 220100 2 31 2,499 349 1,039 2,073 2,598 32,222 64,258 80,536 2-52/S-14 2175000 0 220100 1 14 20,588 1,561 1,143 1,008 23,539 16,007 14,109 329,546 2-58/S-09 2204100 0 220100 2 23 10,674 316 484 504 5,164 11 ,126 11,602 118,763 2-60/U-13 2237500 0 220100 2 30 781 279 526 961 411 15,789 28,828 12,329 Form 10-405 State of Alaska Run Date: 04/03/97 Alaska Oil and Gas Conservation Commission Run Time: 13:49:18 Monthly Production Report 20 AAC 25.230 Page 2 BP Exploration (Alaska) Inc. Endicott Operating Area March, 1997 Daily Average Production Total Monthly Production Well API C Field M Days Gas-Oil Tubing Oil Water Gas Oil Water Gas Name Number L & Pool T In Ratio PSIG BBL BBL MCF BBL BBL MCF 50- S Code H Oper. 2-62/0-17 2164800 0 220100 8 0 0 0 0 0 0 0 0 0 2-68/S-17 2185800 0 220100 8 0 0 0 0 0 0 0 0 0 3-01/N-29 2167800 0 220100 8 0 0 0 0 0 0 0 0 0 3-03/J-33 2230600 0 220100 1 6 21,295 1,980 300 26 6,396 1,802 157 38,374 .5/0-29 2162400 0 220100 2 31 3,751 355 640 1,440 2,399 19,831 44,637 74,382 9/L-28A 2178001 0 220100 1 31 1,904 449 3,370 4,975 6,416 104,469 154,218 198,881 3-11/M-30 2184800 0 220100 2 31 1,879 361 1 ,455 4,900 2,734 45,103 151,897 84,740 3-15/K-33 2175100 0 220100 1 31 7,764 1,377 5,034 9,691 39,083 156,059 300,415 1,211,588 3-17/J-30A 2194601 0 220100 8 0 0 0 0 0 0 0 0 0 3-19/R-28 2246300 0 220100 8 0 0 0 0 0 0 0 0 0 3-21/L-34 2171400 0 220100 2 31 1,243 333 589 7,653 732 18,258 237,242 22,698 3-23/N-32 2164500 0 220100 8 0 0 0 0 0 0 0 0 0 3-25/M-27 2212500 0 220100 2 31 8,211 521 1,150 2,604 9,439 35,636 80,720 292,608 3-27/M-33 2158600 0 220100 2 31 780 355 1,370 5,023 1,068 42,475 155,719 33,122 3-29/J-32 2210600 0 220100 1 31 813 362 1,909 5,154 1,553 59,174 159,767 48,136 3-33/K-37 2166800 0 220100 2 31 556 311 213 3,377 119 6,617 104,688 3,680 3-35/L -36 2170100 0 220100 2 2 750 320 6 1,195 5 12 2,389 9 3-37/L-35 2255400 0 220100 1 30 782 339 363 1,880 284 10,902 56,389 8,521 3-39/J-39 2176400 0 220100 8 0 0 0 0 0 0 0 0 0 3-43/P-36 2241600 0 220100 2 1 18,972 292 36 81 683 36 81 683 3-49/J-40 2173500 0 220100 8 0 0 0 0 0 0 0 0 0 4-02/0-28 2178900 0 220100 1 31 16,693 940 1,244 2,217 20,772 38,577 68,715 643,947 _6A/O-30 2172301 0 220100 2 31 1,800 456 891 3,995 1,603 27,611 123,837 49,698 0/M-28 2246400 0 220100 1 31 10,636 2,463 2,711 105 28,834 84,043 3,242 893,852 4-18/S-30 2189600 0 220100 8 0 0 0 0 0 0 0 0 0 4-20/M-35 2164001 0 220100 2 1 950 882 40 336 38 40 336 38 4-26/0-34 2183500 0 220100 8 0 0 0 0 0 0 0 0 0 4-28/N-37 2187000 0 220100 8 0 0 0 0 0 0 0 0 0 4-32/K-38 2255900 0 220100 1 31 768 315 386 3,373 296 11,970 104,554 9,191 4-34/0-38 2270500 0 220100 1 1 7,376 1,074 330 4,514 2,434 330 4,514 2,434 4-38/K-34 2248200 0 220100 8 0 0 0 0 0 0 0 0 0 4-42/P-38 2173100 0 220100 2 31 674 338 588 4,384 396 18,215 135,916 12,284 4-46/N-39 2195700 0 220100 2 24 775 383 1,033 2,061 801 24,792 49,455 19,216 4-50/K-41 2194000 0 220100 8 0 0 0 0 0 0 0 0 0 220100 Endicott Pool Production Totals.......................... 1,978,021 5,107,439 12,326,025 Form 10-405 State of Alaska Run Date: 04/07/97 Alaska Oil and Gas Conservation Commission Run Time: 09:10:41 Monthly Injection Report 20 AAC 25.432 Page 1 BP Exploration (Alaska) Inc. Endicott Operating Area Endicott March, 1997 Tubing Pressure Casing Pressure Daily Average Injection Total Monthly Injection Well API C Field Days Max Average Max Average Liquid Gas Liquid Gas Name Number l & Pool In PSIG PSIG PSIG PSIG BBl MCF BBl MCF 50- S Code Oper. 2-02/P-18 0292156800 0 220036 6 806.00 475.83 0.00 0.00 197 0 1,186 0 220036 Pool Injection Totals...................... 1,186 0 45/0-20 0292160500 G 220100 31 4,747.00 4,472.61 0.00 0.00 0 84,462 0 2,618,327 5/P-25 0292236100 G 220100 31 4,747.00 4,472.61 0.00 0.00 0 38,517 0 1,194,055 - 3/0-15 0292251000 W 220100 31 2,241.00 2,178.10 0.00 0.00 20,750 0 643,256 0 1-37/P-24 0292174800 W 220100 31 2,144.00 2,082.29 0.00 0.00 12,278 0 380,646 0 1-41/0-23 0292171300 W 220100 27 2,040.00 1,981.96 0.00 0.00 15,781 0 426,106 0 1-43/P-26 0292186400 W 220100 31 2,164.00 2,116.23 0.00 0.00 14,849 0 460,342 0 1-51N-20 0292230400 W 220100 31 2,267.00 2,203.03 0.00 0.00 2,645 0 82,007 0 1-69N-19 0292202000 W 220100 31 2,156.00 2,043.29 0.00 0.00 3,250 0 100,766 0 2-06/J-22 0292169900 G 220100 31 4,747.00 4,472.61 0.00 0.00 0 130,852 0 4,056,432 2-12/0-16 0292230200 G 220100 31 4,747.00 4,472.61 0.00 0.00 0 42,297 0 1,311,237 2-16/M-16 0292188500 W 220100 31 2,134.00 2,075.65 0.00 0.00 18,040 0 559,244 0 2-22/L-14 0292193100 W 220100 31 2,179.00 2,115.71 0.00 0.00 17,039 0 528,211 0 2-24/M-12 0292241800 W 220100 31 2,261.00 2,196.35 0.00 0.00 2,883 0 89,378 0 2-30/0-09 0292222800 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 2-34/P-14 0292166200 W 220100 31 2,166.00 2,109.39 0.00 0.00 21,516 0 667,005 0 2-44/R-12 0292176700 W 220100 30 2,272.00 2,207.23 0.00 0.00 320 0 9,620 0 2-54/0-12 0292221800 W 220100 31 2,137.00 2,080.77 0.00 0.00 21,856 0 677,537 0 2-64/U-10 0292205500 W 220100 31 2,273.00 2,208.97 0.00 0.00 1,798 0 55,752 0 2-70/U-15 0292189900 W 220100 31 2,290.00 2,226.71 0.00 0.00 2,799 0 86,796 0 .7/N-28 0292191100 W 220100 31 2,093.00 2,029.16 0.00 0.00 17,640 0 546,865 0 1/K-39 0292187800 W 220100 31 2,072.00 1,974.00 0.00 0.00 26,873 0 833,090 0 3-45/M-39 0292181100 W 220100 31 2,201.00 2,141.29 0.00 0.00 5,891 0 182,645 0 3-47/0-35 0292156900 W 220100 31 2,084.00 2,035.35 0.00 0.00 11,000 0 341,002 0 4-04rr -26 0292196800 W 220100 31 2,142.00 2,085.42 0.00 0.00 6,643 0 205,934 0 4-08/P-27 0292169200 W 220100 31 1,751.00 1,699.55 0.00 0.00 11 ,790 0 365,517 0 4-14/R-34 0292186300 W 220100 31 1,853.00 1,820.06 0.00 0.00 9,912 0 307,282 0 4-40/P-43 0292226500 W 220100 31 2,221.00 2,159.94 0.00 0.00 3,392 0 105,155 0 4-44/M-44 0292225400 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 4-48/K-43 0292197200 W 220100 5 2,192.00 2,108.00 0.00 0.00 6,124 0 30,620 0 5-01/SD-07 0292051800 G 220100 31 4,747.00 4,472.61 0.00 0.00 0 62,775 0 1,946,032 5-02/SD-10 0292064000 W 220100 31 1,849.00 1 ,808.13 0.00 0.00 13,463 0 417,356 0 220100 Pool Injection Totals...................... 8,102,132 11,126,083 Form 10-406 Run Date: 04/07/97 Run Time: 09: 1 0:41 BP Exploration (Alaska) Inc. API C Field Days Number L & Pool In 50- S Code Oper. END Gathering Center Totals.......................................... Well Name State of Alaska Alaska Oil and Gas Conservation Commission Monthly Injection Report 20 AAC 25.432 Endicott Operating Area Endicott Tubing Pressure Casing Pressure Max Average Max Average PSIG PSIG PSIG PSIG ,Id Injection Total.. ..... ..... ..... ...... ......... ...... .................. ............. ..... ...... e Form 10-406 Daily Average Injection Liquid Gas BBL MCF Page 2 March, 1997 Total Monthly Injection Liquid Gas BBL MCF 8,103,318 11,126,083 8,103,318 11,126,083 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 BP EXPLORATION (ALASKA), INC. Name of Operator ENDICOTT PRODUCTION FACILlN GAS LIQUIDS Field and Pool 1. WELL NO. 2. API NUMBER 3. C 4. FIELD 5 6. DAYS 7. GAS-OIL 8. TUBING DAILY AVERAGE PRODUCTION 50- L & POOL MET - IN RATIO PSIG 9. OIL 110. WATER ". GAS S CODE OPER (BPD) (BPD) (MCF) e 029-0000002 P 220100 7 31 o N/A N/A 4762.7 o e I hereby certify that the foregoing is true and correct to the best of my knowledge ~gned: fPJd u. tIi¡ 15. Title: Manager, Volume, Royalty & Severance Date: '1/7/117 TOTAL 147,644 o FORM 10-405 REV 12-1-85 Mar 1997 Month and Year of Production TOTAL MONTHLY PRODUCTION 12. OIL 113. WATERI14. GAS (BBL) (BBL) (MCF) 147,644 o o o SUBMIT IN DUPLICATE Run Date: 04/03/97 Run Time: 13:35:20 PA SDN OA END BP Exploration (Alaska) Inc. Oil Movement Accounting & Reporting Alaska Oil and Gas Conservation Commission Oil Reconciliation Report From Date: To Date: 3/1/97 3/31/97 Description Pipeline Deliveries, END Oil Volume 2,153,711 TOTAL PIPELINE DELIVERIES 2,153,711 NGL Deliveries, END -147,862 e TOTAL NGL DELIVERIES -147,862 Allocation of SLP to EPA -1,978,021 Load Diesel, SON o Upstream Losses, SON o Downstream Losses, SON o TOTAL FIELD PRODUCTION 27,828 :'"> ~T ,ft '¡(':' c.-¡ ;v r'T1 n rT'. ~. « ~£ " -" C~ ;j":. c' ~ ~> -' ::ó ¡¡. Wi g (,C) --. <. C.¡;;) ~! rTi C? I hereby certify that the fOre~~ng is true and correct to the best of my knowledge. Signed: ¡Juul f). !J¡¡ Titie:fr\6t. VCJ-, ~ i S:v: Page 1 Date: ~h¡Í7 Report # SUMDU'D - 05 Run Date: 04/03/97 Run Time: 13:49: 18 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Production Report BP Exploration (Alaska) Inc. Well API C Field M Days Gas-Oil Name Number L & Pool T In Ratio 50- S Code H Oper. 2-32/SN-03 2208400 0 220150 2 31 627 2-38/SN-01 2209000 0 220150 2 31 626 220150 Sag Delta North Pool Production Totals.......................... e ;:-0 i"T1 (") iÏ; ';,.;'~, :1:"> ~A q -~..~..... -~. , >".',' < rr; Cì Form 10-405 20 AAC 25.230 Endicott Operating Area Daily Average Production Oil Water Gas BBL BBL MCF Tubing PSIG 296 298 288 609 769 4,541 181 381 Page 3 March, 1997 Total Monthly Production Oil Water Gas BBL BBL MCF 8,939 18,889 23,847 140,761 5,603 11,823 27,828 164,608 17,426 Run Date: 04/03/97 Run Time: 13:44:14 BP Exploration (Alaska) Inc. API C Field Number L & Pool 50- S Code 1-11/SN-04 0292210700 W 220150 5-03I8D-09 0292063900 W 220150 220150 Pool Injection Totals...................... Well Name eo Gathering Center Totals.......................................... Days In Oper. 31 31 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Injection Report 20 AAC 25.432 Endicott Operating Area Sag Delta North Unit Tubing Pressure Casing Pressure Daily Average Injection Max Average Max Average Liquid Gas PSIG PSIG PSIG PSIG BBL MCF 2,155.00 1,769.00 2,107.29 1,740.45 0.00 0.00 0.00 0.00 4,948 4,821 Field Injection Total................................................................................ e Form 10-406 . . Page 1 March, 1997 Total Monthly Injection Liquid Gas BBL MCF o o 153,389 149,480 302,869 o o o 302,869 o 302,869 o e . g ¡;.>r> !:;w ~ .~ ::.r ã ~, C ~:J ç:'"}, ~. (':"J. T ~ 3 W wo' Õ :;:t J> -0 ;D ^' m () r"í ~ ! (.t:) --" u:;t <.s:J -...¡ < ~ o STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 MC 25.230 BP EXPLORATION (ALASKA), INC. Name of Operator SAG DELTA NORTH PRODUCTION FACILITY GAS LIQUIDS Mar 1997 Field and Pool Month and Year of Production I. WELL 2. API NUMBER C 4. FIELD 6. DAYS 7. GAS-OIL 8. TUBING DAILY AVERAGE PRODUCTION NO. SO- L & POOL METI- IN RATIO PSIG 9. OIL 110. WATERlll. GAS S CODE OPER (BPD) (BPD) (MCF) 029-0000006 P 220150 7 31 N/A N/A 7.0 0 0 ~~;::cOO~ P;;J roO~'°pj¡ ood correct!o fue be. of my koo~edge Date: 1/1 If? IS. Title: Manager, Volume, Royalty & Severance TOTAL FORM 10-405 REV 12- 1-85 TOTAL MONTHLY PRODUCTION 12. OIL 113. WATER 114. GAS (BBL) (BBL) (MCF) 218 o o 218 o o SUBMIT IN DUPLICATE Run Date: Run Time: PA OA 05/05/97 09:33:45 EPA END 4/1/97 4/30/97 BP Exploration (Alaska) Inc. Oil Movement Accounting & Reporting Alaska Oil and Gas Conservation Commission Oil Reconciliation Report From Date: To Date: Description Pipeline Deliveries, END Oil Volume 1,967,784 TOTAL PIPELINE DELIVERIES 1,967,784 NGL Deliveries, END -132,794 e TOTAL NGL DELIVERIES -132,794 Allocation of SLP to SON -19,906 Load Diesel, EPA -14 Upstream Losses, EPA 0 Downstream Losses, EPA 0 TOTAL FIELD PRODUCTION 1,815,070 e I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed: foul fit¡ Title: /Ilbt., tJlL / fdf4<4Y'¡ 5¥. f1Jj Date: Page 1 Report # SUMDUD - 05 5/6ft7 BP EXPLORATION (ALASKA), INC. Name of Operator STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 MC 25.230 ENDICOTT PRODUCTION FACILlN GAS LIQUIDS Field and Pool 1. WELL NO. 2. API NUMBER 3. C 4. FIELD 5 6. DAYS 7. GAS-OIL 8. TUBING DAILY AVERAGE PRODUCTION 50- L & POOL MET!- IN RATIO PSIG 9. OIL 110. WATER ll. GAS S CODE OPER (BPD) (BPD) (MCF) e 029-0000002 P 220100 7 30 o e N/A N/ A 4420.6 o I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Ylud It¡ 15. Title: Manager, Volume, Royalty & Severance Date: '5/6;'1 TOTAL 132,619 o FORM 10-405 REV 12- 1-85 Apr 1997 Month and Year of Production TOTAL MONTHLY PRODUCTiON 12. OIL 113. WATERI14. GAS (BBL) (BBL) (MCF) 132,619 o o o SUBMIT IN DUPLICATE State of Alaska Run Date: 05/05/97 Alaska Oil and Gas Conservation Commission Run Time: 09:34: 10 Monthly Production Report 20 AAC 25.230 Page 1 BP Exploration (Alaska) Inc. Endicott Operating Area April, 1997 Daily Average Production Total Monthly Production Well API C Field M Days Gas-Oil Tubing Oil Water Gas Oil Water Gas Name Number L & Pool T In Ratio PSIG BBL BBL MCF BBL BBL MCF 50- S Code H Oper. 1-01/J-19 2180100 0 220100 1 30 5,599 530 1,987 1,053 11 ,126 59,614 31,604 333,774 1-03/P-16 2260100 0 220100 1 29 10,096 1,868 1,817 2,734 18,348 52,701 79,295 532,078 1-09A/L-21 2174301 0 220100 1 28 881 309 2,613 1,616 2,302 73,167 45,245 64,450 1-17 A/I-17 2210001 0 220100 2 28 2,782 288 1,066 1,318 2,965 29,846 36,908 83,020 _9/1-18 2256900 0 220100 1 24 9,314 332 603 9,809 5,620 14,480 235,415 134,871 1/K-25 2200500 0 220100 1 16 5,190 514 1,227 45 6,367 19,626 723 101,865 1-25/N-22 2172200 0 220100 1 5 12,082 2,737 1 ,462 138 17,666 7,311 689 88,328 1-27/P-20 2169300 0 220100 1 29 10,058 1,322 2,652 5,487 26,669 76,894 159,128 773,391 1-29/M-25 2166900 0 220100 1 30 5,220 431 3,009 2,596 15,707 90,275 77,879 471,203 1-31/M-21 2256200 0 220100 1 28 962 426 630 4,716 606 17,634 132,045 16,957 1-33/M-23 2257700 0 220100 1 30 494 286 430 3,858 212 12,900 115,744 6,370 1-35/0-25 2167200 0 220100 1 30 13,899 2,333 675 443 9,378 20,243 13,300 281,353 1-39/P-17 2182700 0 220100 2 15 14,528 1 ,420 517 6,732 7,511 7,755 100,986 112,667 1-45/0-26 2199100 0 220100 8 0 0 0 0 0 0 0 0 0 1-47/0-21 2162500 0 220100 8 0 0 0 0 0 0 0 0 0 1-49/P-21 2184100 0 220100 1 24 1,476 396 338 6,842 500 8,120 164,205 11,989 1-55/R-25 2178800 0 220100 8 0 0 0 0 0 0 0 0 0 1-57/R-23 2187300 0 220100 8 0 0 0 0 0 0 0 0 0 1-61/0-20 2252000 0 220100 1 28 9,395 1,519 1,316 7,836 12,367 36,858 219,408 346,266 1-63fT -22 2190500 0 220100 1 29 9,163 1,609 2,516 2,277 23,050 72,950 66,042 668,463 1-65/N-25 2262700 0 220100 1 30 7,172 2,010 1,356 1,786 9,723 40,667 53,576 291,683 1-67fT-20 2198500 0 220100 8 0 0 0 0 0 0 0 0 0 _4/M-19 2158500 0 220100 1 30 3,850 359 2,099 4,358 8,080 62,964 130,745 242,398 8/K-16 2177100 0 220100 2 30 652 273 610 2,218 398 18,305 66,525 11,930 2-14/0-16 2163900 0 220100 1 30 4,924 462 3,968 8,873 19,540 119,051 266,196 586,212 2-18/L-16 2203200 0 220100 1 30 4,984 393 2,786 8,033 13,885 83,575 240,992 416,561 2-20/L -15 2204800 0 220100 2 30 2,973 286 312 74 926 9,349 2,218 27,792 2-26/N-14 2181500 0 220100 2 3 714 332 5 2,689 3 14 8,066 10 2-28/P-19 2184700 0 220100 1 30 994 311 889 7,148 884 26,666 214,429 26,507 2-36/0-14 2201400 0 220100 1 22 13,098 1,591 1,349 3,570 17,676 29,688 78,548 388,867 2-40/S-22 2252700 0 220100 8 0 0 0 0 0 0 0 0 0 2-42/P-13 2189200 0 220100 8 0 0 0 0 0 0 0 0 0 2-46A/R-10 2192101 0 220100 1 15 3,161 350 280 2,325 884 4,195 34,875 13,259 2-48/0-13 2261200 0 220100 1 30 8,134 2,364 2,657 1,888 21,612 79,705 56,651 648,348 2-50/U-08 2236700 0 220100 2 30 2,787 329 760 1,622 2,118 22,794 48,663 63,528 2-52/S-14 2175000 0 220100 8 0 0 0 0 0 0 0 0 0 2-58/S-09 2204100 0 220100 2 28 10,749 324 475 553 5,107 13,303 15,496 142,992 2-60/U-13 2237500 0 220100 2 25 511 274 269 1,433 137 6,724 35,833 3,435 Form 10-405 State of Alaska Run Date: 05/05/97 Alaska Oil and Gas Conservation Commission Run Time: 09:34:10 Monthly Production Report 20 MC 25.230 Page 2 BP Exploration (Alaska) Inc. Endicott Operating Area April, 1997 Daily Average Production Total Monthly Production Well API C Field M Days Gas-Oil Tubing Oil Water Gas Oil Water Gas Name Number L & Pool T In Ratio PSIG BBL BBL MCF BBL BBL MCF 50- S Code H Oper. 2-62/0-17 2164800 0 220100 8 0 0 0 0 0 0 0 0 0 2-68/S-17 2185800 0 220100 8 0 0 0 0 0 0 0 0 0 3-01/N-29 2167800 0 220100 8 0 0 0 0 0 0 0 0 0 3-03/J-33 2230600 0 220100 1 30 10,367 2,252 724 68 7,506 21 ,720 2,047 225,182 _5/0-29 2162400 0 220100 2 30 4,775 362 602 1,548 2,874 18,056 46,440 86,223 9/L-28A 2178001 0 220100 1 30 1,993 445 2,868 5,789 5,717 86,042 173,657 171,509 3-11/M-30 2184800 0 220100 2 30 1,711 355 1,261 4,946 2,158 37,837 148,367 64,739 3-15/K-33 2175100 0 220100 1 30 7,048 1,329 5,139 9,660 36,220 154,162 289,814 1,086,587 3-17/J-30A 2194601 0 220100 8 0 0 0 0 0 0 0 0 0 3-19/R-28 2246300 0 220100 8 0 0 0 0 0 0 0 0 0 3-21/L-34 2171400 0 220100 2 30 1,064 329 587 7,657 625 17,617 229,715 18,749 3-23/N-32 2164500 0 220100 8 0 0 0 0 0 0 0 0 0 3-25/M-27 2212500 0 220100 2 30 9,546 566 1,108 2,805 10,580 33,250 84,164 317,396 3-27/M-33 2158600 0 220100 2 30 670 350 1,474 5,192 987 44,218 155,751 29,622 3-29/J-32 2210600 0 220100 1 30 666 354 1,839 5,003 1,225 55,180 150,091 36,748 3-33/K-37 2166800 0 220100 2 30 619 309 116 3,109 72 3,472 93,276 2,150 3-35/L-36 2170100 0 220100 8 0 0 0 0 0 0 0 0 0 3-37/L-35 2255400 0 220100 1 29 702 340 453 2,053 318 13,127 59,548 9,214 3-39/J-39 2176400 0 220100 8 0 0 0 0 0 0 0 0 0 3-43/P-36 2241600 0 220100 8 0 0 0 0 0 0 0 0 0 3-49A/M-40 2173502 0 220100 2 8 996 378 498 2,600 495 3,980 20,797 3,963 4-02/0-28 2178900 0 220100 1 30 15,431 940 1,236 2,355 19,067 37,068 70,654 571,995 _6A/O-30 2172301 0 220100 2 30 2,210 442 770 4,055 1,700 23,087 121,652 51,014 0/M-28 2246400 0 220100 1 30 10,760 2,425 2,552 245 27,461 76,564 7,361 823,815 4-18/S-30 2189600 0 220100 8 0 0 0 0 0 0 0 0 0 4-20/M-35 2164001 0 220100 8 0 0 0 0 0 0 0 0 0 4-26/0-34 2183500 0 220100 2 1 1,000 313 1 864 1 1 864 1 4'-28/N-37 2187000 0 220100 8 0 0 0 0 0 0 0 0 0 4-32/K-38 2255900 0 220100 1 30 709 310 660 2,447 468 19,803 73,414 14,033 4-34/0-38 2270500 0 220100 1 7 2,023 1,086 271 4,371 548 1,896 30,596 3,836 4-38/K-34 2248200 0 220100 8 0 0 0 0 0 0 0 0 0 4-42/P-38 2173100 0 220100 2 30 806 334 414 4,846 333 12,41 0 145,369 10,000 4-46/N-39 2195700 0 220100 2 30 3,222 401 1,094 2,489 3,526 32,829 74,659 105,775 4-50/K-41 2194000 0 220100 2 25 516 396 215 3,223 111 5,377 80,563 2,774 220100 Endicott Pool Production Totals.......................... 1,815,070 4,790,228 10,525,892 Form 10-405 State of Alaska Run Date: 05/05/97 Alaska Oil and Gas Conservation Commission Run Time: 09:34:50 Monthly Injection Report 20 AAC 25.432 Page 1 BP Exploration (Alaska) Inc. Endicott Operating Area Endicott April, 1997 Tubing Pressure Casing Pressure Daily Average Injection Total Monthly Injection Well API C Field Days Max Average Max Average Liquid Gas Liquid Gas Name Number L & Pool In PSIG PSIG PSIG PSIG BBL MCF BBL MCF 50- S Code Oper. 2-02/P-18 0292156800 0 220036 6 1,551.00 898.17 0.00 0.00 661 0 3,968 0 220036 Pool Injection Totals...................... 3,968 0 1-05/0-20 0292160500 G 220100 30 4,581.00 4,403.43 0.00 0.00 0 78,550 0 2,356,508 .5/P-25 0292236100 G 220100 30 4,581.00 4,403.43 0.00 0.00 0 32,313 0 969,402 -23/0-15 0292251000 W 220100 30 2,328.00 2,122.40 0.00 0.00 19,971 0 599,141 0 1-37/P-24 0292174800 W 220100 30 2,197.00 2,026.07 0.00 0.00 11,916 0 357,500 0 1-41/0·23 0292171300 W 220100 30 2,103.00 1,937.40 0.00 0.00 15,882 0 476,460 0 1-43/P-26 0292186400 W 220100 30 2,242.00 2,069.23 0.00 0.00 13,474 0 404,244 0 1-51N-20 0292230400 W 220100 30 2,355.00 2,148.43 0.00 0.00 2,763 0 82,909 0 1-69N-19 0292202000 W 220100 30 2,204.00 2,071.73 0.00 0.00 3,675 0 110,255 0 2-06/J-22 0292169900 G 220100 30 4,581.00 4,403.43 0.00 0.00 0 118,403 0 3,552,108 2-12/0-16 0292230200 G 220100 30 4,581.00 4,403.43 0.00 0.00 0 31,090 0 932,722 2-16/M-16 0292188500 W 220100 30 2,214.00 2,031.67 0.00 0.00 17,370 0 521,121 0 2-22/L-14 0292193100 W 220100 30 2,244.00 2,079.13 0.00 0.00 15,003 0 450,095 0 2-24/M-12 0292241800 W 220100 30 2,350.00 2,147.93 0.00 0.00 1,729 0 51,887 0 2-30/0-09 0292222800 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 2-34/P-14 0292166200 W 220100 30 2,246.00 2,059.23 0.00 0.00 20,719 0 621,599 0 2-44/R-12 0292176700 W 220100 23 2,362.00 2,231.13 0.00 0.00 274 0 6,323 0 2-54/0-12 0292221800 W 220100 30 2,207.00 2,032.93 0.00 0.00 21,587 0 647,612 0 2-64/U-10 0292205500 W 220100 24 2,363.00 2,205.67 0.00 0.00 1,623 0 38,959 0 2-70/U-15 0292189900 W 220100 30 2,380.00 2,171.47 0.00 0.00 2,590 0 77,701 0 _7/N-28 0292191100 W 220100 30 2,197.00 1,995.57 0.00 0.00 16,955 0 508,654 0 ~ 1/K-39 0292187800 W 220100 30 2,183.00 1,985.50 0.00 0.00 25,659 0 769,780 0 3-45/M-39 0292181100 W 220100 25 2,177.00 2,048.00 0.00 0.00 4,898 0 122,472 0 3-47/0-35 0292156900 W 220100 24 2,088.00 1,995.25 0.00 0.00 9,690 0 232,577 0 4-04fT -26 0292196800 W 220100 30 2,235.00 2,040.77 0.00 0.00 6,474 0 194,224 0 4-08/P-27 0292169200 W 220100 30 1,819.00 1,683.53 0.00 0.00 11 ,821 0 354,636 0 4-14/R-34 0292186300 W 220100 30 1,936.00 1,814.73 0.00 0.00 9,805 0 294,173 0 4-40/P-43 0292226500 W 220100 30 2,315.00 2,117.33 0.00 0.00 3,110 0 93,306 0 4-44/M-44 0292225400 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 4-48/K-43 0292197200 W 220100 2 2,210.00 2,193.00 0.00 0.00 8,222 0 16,445 0 5-01/SD-07 0292051800 G 220100 30 4,581.00 4,403.43 0.00 0.00 0 53,888 0 1,616,666 5-02/SD-10 0292064000 W 220100 30 1,913.00 1,798.43 0.00 0.00 13,043 0 391,309 0 220100 Pool Injection Totals...................... 7,423,382 9,427,406 Form 10-406 Run Date: 05/05/97 Run Time: 09:34:50 BP Exploration (Alaska) Inc. API C Field Days Number L & Pool In 50- S Code Oper. END Gathering Center Totals.......................................... Well Name State of Alaska Alaska Oil and Gas Conservation Commission Monthly Injection Report 20 AAC 25.432 Endicott Operating Area Endicott Tubing Pressure Casing Pressure Max Average Max Average PSIG PSIG PSIG PSIG Field Injection Total... ....... ... ...... ................... ....... ..... ................ .............. e e Form 10-406 Daily Average Injection Liquid Gas BBL MCF Page 2 April, 1997 Total Monthly Injection Liquid Gas BBL MCF 7,427,350 9,427,406 7,427,350 9,427,406 Run Date: Run Time: PA OA e e 05/05/97 09:33:25 SDN END II ~.~ ~ i~\rao ::::;: t~ ~; ~~. ('Y. g ;:i ·,fP . .¡: \ ï¡ Report # SUMDVD - 05 . BP Exploration (Alaska) Inc. Oil Movement Accounting & Reporting Alaska Oil and Gas Conservation Commission Oil Reconciliation Report From Date: To Date: 4/1/97 4/30/97 Description Pipeline Deliveries, END Oil Volume 1,967,784 TOTAL PIPELINE DELIVERIES NGL Deliveries, END TOTAL NGL DELIVERIES Allocation of SLP to EPA Load Diesel, SON Upstream Losses, SON Downstream Losses, SON TOTAL FIELD PRODUCTION .,0 j'M ~i::~:Y certi?;e ~e1iS true and correct to the best Of:~ekn::ge~1 f!DY (~. '0/ Page 1 1,967,784 -132,794 -132,794 -1,815,084 o o o 19,906 Date: 5 ~¡'1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 BP EXPLORATION (ALASKA), INC. Name of Operator SAG DELTA NORTH PRODUCTION FACILITY GAS LIQUIDS Apr 1997 Field and Pool Month and Year of Production e 1. WELL 2. API NUMBER C 4. FIELD 6. DAYS 7. GAS-OIL 8. TUBING DAILY AVERAGE PRODUCTION NO. 50- L & POOL METI- IN RATIO PSIG 9. OIL 110. WATER ll. GAS S CODE OPER (BPD) (BPD) (MCF) 029-0000006 P 220150 7 30 N/A N/A 5.8 0 0 e I hereby certify that the foregoing is true and correct to the best of my knowledge Signed: 104 (J , 15. Title: Manaaer. Volume. Royalty & Severance Date: 5Jfr7 TOTAL FORM 10-405 REV 12-1-85 TOTAL MONTHLY PRODUCTION 12. OIL 113. WATER 114. GAS (BBL) (BBL) (MCF) 175 o o 175 o o SUBMIT IN DUPLICATE Run Date: 05/05/97 Run Time: 09:34:10 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Production Report BP Exploration (Alaska) Inc. Well API C Field M Days Gas-Oil Name Number L & Pool T In Ratio 50- S Code H Oper. 2-32/SN-03 2208400 0 220150 2 30 625 2-38/SN-01 2209000 0 220150 2 30 626 220150 Sag Delta North Pool Production Totals.......................... e e ~ ,- '~ ~(!: i:,,' ØJ ftw :g S;j or- '$!;I - 1Ii. WO· c ~S IS, ~. i= ff Form 10-405 ~ r"'f1 ",. ".'¡'. >J;;¡ij --- '..0 <.D -J ,,1""\ ::J 20 AAC 25.230 Endicott Operating Area Daily Average Production Oil Water Gas BBL BBL MCF Tubing PSIG 290 291 260 403 898 5,251 163 253 Page 3 April, 1997 Total Monthly Production Oil Water Gas BBL BBL MCF 7,812 12,094 26,939 157,530 4,885 7,575 19,906 184,469 12,460 Run Date: 05/05/97 Run Time: 09:35:11 BP Exploration (Alaska) Inc. API C Field Number L & Pool 50- S Code 1-11/SN-04 0292210700 W 220150 5-03/SD-09 0292063900 W 220150 220150 Pool Injection Totals...................... Well Name ~ Gathering Center Totals.......................................... Days In Oper. 30 30 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Injection Report 20 AAC 25.432 Endicott Operating Area Sag Delta North Unit Tubing Pressure Casing Pressure Daily Average Injection Max Average Max Average Liquid Gas PSIG PSIG PSIG PSIG BBL MCF 2,205.00 1,809.00 2,058.73 1,711.70 0.00 0.00 0.00 0.00 4,865 4,518 Field Injection T otal....... ..... ................... ............ ..... ............ .................... e Form 10-406 Page 1 April, 1997 Total Monthly Injection Liquid Gas BBL MCF o o 145,977 135,568 281,545 o o o 281,545 o 281,545 o Run Date: Run Time: PA OA 06/04/97 13:00:54 EPA END BP Exploration (Alaska) Inc. Oil Movement Accounting & Reporting Alaska Oil and Gas Conservation Commission Oil Reconciliation Report From Date: To Date: 5/1/97 5/31/97 Description Pipeline Deliveries, END Oil Volume 1,969,348 TOTAL PIPELINE DELIVERIES 1,969,348 NGL Deliveries, END -134,828 e TOTAL NGL DELIVERIES -134,828 Allocation of SLP to SDN ·21,397 Load Diesel, EPA -321 Upstream Losses, EPA 0 ~ Downstream Losses, EPA 0 Ë- TOTAL FIELD PRODUCTION 1,812,802 g c- Ã7 Roo C m »ø :z é"\ glU :;rl(l) m ~~ (!) IU::J cc 1(1) .-& < e (I)' ð (þ 0 (þ M"1 3 ......, 3 0 (ñ (þ õ' ::I I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed: truJ fl æ¡ Title: iWL ~ ldf (~ Page 1 Date: þ;S-~ Report # SUMOUÐ - 05 . BP EXPLORATION (ALASKA), INC. Name of Operator STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 ENDICOTT PRODUCTION FACILITY GAS LIQUIDS Field and Pool 1. WELL NO. 2. API NUMBER 3. C 4. FIELD 5 6. DAYS 7. GAS-OIL 8. TUBING DAILY AVERAGE PRODUCTION 50- L & POOL MET - IN RATIO PSIG 9. OIL 110. WATERlll. GAS S CODE OPER (BPD) (BPD) (MCF) e 029-0000002 P 220100 7 31 o ~ tl Q g «=- ::::0 øo c:: m >m ::z: n ªI» :;ren I m 00 ..,0 <.D 1»;::1 (Q en ..-0. < cþ' C':) c..o 0 c..o m :3 ...... :3 0 iñ en S' :::s e NIA N/A 4343.6 o I hereby certify that the foregoing is true and correct to the best of my knowledge Signed fføi tI;¡ 15. Title: Manager, Volume, Royalty & Severance Date: 6/5)7 TOTAL 134,652 o FORM 10-405 REV 12-1-85 May 1997 Month and Year of Production TOTAL MONTHLY PRODUCTION 12. OIL 113. WATERI14. GAS (BBL) (BBL) (MCF) 134,652 o o o SUBMIT IN DUPLICATE State of Alaska Run Date: 06/04/97 Alaska Oil and Gas Conservation Commission Run Time: 12:57:33 Monthly Production Report 20 AAC 25.230 Page 1 BP Exploration (Alaska) Inc. Endicott Operating Area May, 1997 Daily Average Production Total Monthly Production Well API C Field M Days Gas-Oil Tubing Oil Water Gas Oil Water Gas Name Number L & Pool T In Ratio PSIG BBL BBL MCF BBL BBL MCF 50- S Code H Oper. 1-01/J-19 2180100 0 220100 1 31 6,815 780 2,514 1,381 17,132 77,924 42,805 531,091 1-03/P-16 2260100 0 220100 1 31 11 ,794 2,023 1,311 2,807 15,460 40,635 87,023 479,259 1-09A/L-21 2174301 0 220100 1 31 882 291 2,183 936 1,927 67,684 29,025 59,728 1-17A/I-17 2210001 0 220100 2 31 4,448 280 1,134 1,097 5,043 35,149 33,992 156,336 419/1-18 2256900 0 220100 1 11 4,033 340 194 8,622 781 2,130 94,838 8,590 1/K-25 2200500 0 220100 1 30 4,832 419 646 36 3,119 19,367 1,087 93,583 1-25A/K-22 2172201 0 220100 1 2 41,925 307 67 21 2,809 134 42 5,618 1-27/P-20 2169300 0 220100 1 31 9,358 1,544 2,066 3,818 19,333 64,044 118,367 599,328 1-29/M-25 2166900 0 220100 1 31 6,228 438 3,036 2,888 18,908 94,117 89,530 586,139 1-31/M-21 2256200 0 220100 1 29 945 403 690 5,022 652 20,007 145,624 18,905 1-33/M-23 2257700 0 220100 1 31 587 284 362 3,957 213 11 ,237 122,658 6,594 1-35/0-25 2167200 0 220100 1 18 13,587 1,519 375 191 5,090 6,743 3,435 91,616 1-39/P-17 2182700 0 220100 2 30 4,805 507 367 5,830 1,765 11,022 174,904 52,964 1-45/0-26 2199100 0 220100 8 0 0 0 0 0 0 0 0 0 1-47/0-21 2162500 0 220100 8 0 0 0 0 0 0 0 0 0 1-49/P-21 2184100 0 220100 1 30 1,389 424 466 7,457 647 13,970 223,721 19,410 1-55/R-25 2178800 0 220100 8 0 0 0 0 0 0 0 0 0 1-57/R-23 2187300 0 220100 8 0 0 0 0 0 0 0 0 0 1-61/0-20 2252000 0 220100 1 30 7,469 1,384 1,893 9,516 14,139 56,791 285,488 424,174 1-63fT-22 2190500 0 220100 1 18 10,134 1,411 1,933 2,361 19,593 34,801 42,503 352,675 1-65/N-25 2262700 0 220100 1 30 6,988 2,036 1,387 1,906 9,694 41,618 57,190 290,806 1-67 fT -20 2198500 0 220100 1 3 1,848 703 11 1,131 20 33 3,393 61 .4/M-19 2158500 0 220100 1 31 5,116 404 2,232 5,071 11,419 69,190 157,191 353,978 8/K-16 2177100 0 220100 2 31 489 277 406 2,311 199 12,601 71,651 6,157 2-14/0-16 2163900 0 220100 1 31 5,988 496 3,640 9,249 21,798 112,839 286,704 675,725 2-18/L-16 2203200 0 220100 1 30 6,180 387 2,340 10,382 14,459 70,186 311,456 433,779 2-20/L -15 2204800 0 220100 2 31 3,170 285 335 50 1,063 10,389 1,551 32,938 2-26/N-14 2181500 0 220100 2 1 0 222 0 316 0 0 316 0 2-28/P-19 2184700 0 220100 1 13 1,065 318 519 4,622 552 6,744 60,092 7,180 2-36/0-14 2201400 0 220100 1 30 9,398 1,208 2,290 5,461 21,517 68,685 163,818 645,495 2-40/S-22 2252700 0 220100 8 0 0 0 0 0 0 0 0 0 2-42/P-13 2189200 0 220100 8 0 0 0 0 0 0 0 0 0 2-46A1R-10 2192101 0 220100 8 0 0 0 0 0 0 0 0 0 2-48/0-13 2261200 0 220100 1 31 9,170 2,505 2,549 2,084 23,371 79,008 64,595 724,490 2-50/U-08 2236700 0 220100 2 29 3,119 342 705 1,474 2,199 20,446 42,745 63,762 2-52/S-14 2175000 0 220100 1 10 20,539 679 388 329 7,978 3,884 3,292 79,775 2-58/S-09 2204100 0 220100 2 31 12,175 312 461 606 5,618 14,305 18,784 174,167 2-60/U-13 2237500 0 220100 2 31 756 271 261 1,370 197 8,085 42,462 6,109 Form 10-405 State of Alaska Run Date: 06/04/97 Alaska Oil and Gas Conservation Commission Run Time: 12:57:33 Monthly Production Report 20 AAC 25.230 Page 2 BP Exploration (Alaska) Inc. Endicott Operating Area May, 1997 Daily Average Production Total Monthly Production Well API C Field M Days Gas-Oil Tubing Oil Water Gas Oil Water Gas Name Number L & Pool T In Ratio PSIG BBL BBL MCF BBL BBL MCF 50- S Code H Oper. 2-62/0-17 2164800 0 220100 8 0 0 0 0 0 0 0 0 0 2-68/S-17 2185800 0 220100 8 0 0 0 0 0 0 0 0 0 3-01/N-29 2167800 0 220100 8 0 0 0 0 0 0 0 0 0 3-03/J-33 2230600 0 220100 1 15 16,151 2,078 559 54 9,024 8,381 807 135,362 .5/0-29 2162400 0 220100 2 31 3,009 337 511 1,564 1,539 15,851 48,487 47,699 9/L-28A 2178001 0 220100 1 31 1,314 460 4,797 6,220 6,306 148,722 192,834 195,493 3-11/M-30 2184800 0 220100 2 31 1,531 350 1,216 4,805 1,862 37,691 148,968 57,708 3-15/K-33 2175100 0 220100 1 31 6,486 1,364 4,059 11 ,223 26,324 125,816 347,922 816,042 3-17/J-30A 2194601 0 220100 8 0 0 0 0 0 0 0 0 0 3-19/R-28 2246300 0 220100 8 0 0 0 0 0 0 0 0 0 3-21/L-34 2171400 0 220100 2 31 1,237 325 555 7,914 686 17,200 245,336 21,280 3-23/N-32 2164500 0 220100 8 0 0 0 0 0 0 0 0 0 3-25/M-27 2212500 0 220100 2 31 11 ,836 587 1,028 2,629 12,168 31,869 81,503 377,214 3-27/M-33 2158600 0 220100 2 28 777 341 1,556 4,554 1,209 43,576 127,518 33,857 3-29/J-32 2210600 0 220100 1 31 670 339 1,814 5,134 1,215 56,227 159,151 37,674 3-33/K-37 2166800 0 220100 2 23 1,162 308 106 3,490 123 2,431 80,275 2,826 3-35/L-36 2170100 0 220100 2 2 727 353 6 1,056 4 11 2,112 8 3-37/L-35 2255400 0 220100 1 24 786 313 438 2,176 344 10,507 52,226 8,258 3-39A/1-37 2176401 0 220100 8 0 0 0 0 0 0 0 0 0 3-43/P-36 2241600 0 220100 8 0 0 0 0 0 0 0 0 0 3-49A1M-40 2173502 0 220100 2 29 882 360 884 2,967 779 25,630 86,048 22,600 4-02/0-28 2178900 0 220100 1 31 17,716 960 1,348 2,397 23,886 41 ,796 74,300 740,477 ,,6A10-30 2172301 0 220100 2 29 3,665 432 882 3,611 3,234 25,591 1 04,729 93,790 0/M-28 2246400 0 220100 1 31 11 ,785 2,459 2,661 264 31,355 82,476 8,196 971,998 4-18/S-30 2189600 0 220100 8 0 0 0 0 0 0 0 0 0 4-20/M-35 2164001 0 220100 2 2 914 917 47 372 43 93 744 85 4-26/0-34 2183500 0 220100 8 0 0 0 0 0 0 0 0 0 4-28/N-37 2187000 0 220100 8 0 0 0 0 0 0 0 0 0 4-32/K-38 2255900 0 220100 1 31 417 306 675 2,766 282 20,935 85,758 8,740 4-34/0-38 2270500 0 220100 8 0 0 0 0 0 0 0 0 0 4-38/K-34 2248200 0 220100 8 0 0 0 0 0 0 0 0 0 4-42/P-38 2173100 0 220100 2 31 726 327 450 4,434 327 13,965 137,461 10,134 4-46/N-39 2195700 0 220100 2 31 3,702 402 938 2,093 3,474 29,091 64,887 107,704 4-50/K-41 2194000 0 220100 2 15 928 371 78 2,987 73 1,175 44,802 1,090 220100 Endicott Pool Production Totals.......................... 1,812,802 4,874,346 10,670,471 Form 10-405 State of Alaska Run Date: 06/04/97 Alaska Oil and Gas Conservation Commission Run Time: 12:58:06 Monthly Injection Report 20 AAC 25.432 Page 1 BP Exploration (Alaska) Inc. Endicott Operating Area Endicott May, 1997 Tubing Pressure Casing Pressure Daily Average Injection Total Monthly Injection Well API C Field Days Max Average Max Average Liquid Gas Liquid Gas Name Number L & Pool In PSIG PSIG PSIG PSIG BBL MCF BBL MCF 50- S Code Oper. 2-02lP-18 0292156800 D 220036 6 1,244.00 761.17 0.00 0.00 330 0 1,984 0 220036 Pool Injection Totals...................... 1,984 0 1-05/0-20 0292160500 G 220100 31 4,599.00 4,354.26 0.00 0.00 0 87,323 0 2,707,036 _5/P-25 0292236100 G 220100 31 4,599.00 4,354.26 0.00 0.00 0 23,456 0 727,163 3/0-15 0292251000 W 220100 31 2,180.00 2,042.52 0.00 0.00 18,324 0 568,069 0 1-37/P-24 0292174800 W 220100 30 2,146.00 2,014.50 0.00 0.00 11,910 0 357,316 0 1-41/0-23 0292171300 W 220100 30 2,022.00 1,901.63 0.00 0.00 14,229 0 426,896 0 1-43/P-26 0292186400 W 220100 31 2,125.00 2,004.00 0.00 0.00 11 ,172 0 346,349 0 1-51N-20 0292230400 W 220100 31 2,205.00 2,065.55 0.00 0.00 2,546 0 78,937 0 1-69N-19 0292202000 W 220100 26 2,164.00 2,017.62 0.00 0.00 3,573 0 92,905 0 2-06/J-22 0292169900 G 220100 31 4,599.00 4,354.26 0.00 0.00 0 107,144 0 3,321,480 2-12/0-16 0292230200 G 220100 31 4,599.00 4,354.26 0.00 0.00 0 18,949 0 587,439 2-16/M-16 0292188500 W 220100 31 2,097.00 1,971.45 0.00 0.00 16,177 0 501,506 0 2-22/L-14 0292193100 W 220100 30 2,156.00 2,006.50 0.00 0.00 13,445 0 403,379 0 2-24/M-12 0292241800 W 220100 31 2,200.00 2,061.13 0.00 0.00 1,263 0 39,181 0 2-30/0-09 0292222800 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 2-34/P-14 0292166200 W 220100 31 2,120.00 1,992.10 0.00 0.00 18,266 0 566,271 0 2-44/R-12 0292176700 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 2-54/0-12 0292221800 W 220100 31 2,120.00 1,980.23 0.00 0.00 21,166 0 656,164 0 2-64/U-10 0292205500 W 220100 21 2,198.00 2,032.48 0.00 0.00 1,217 0 25,565 0 2-70/U-15 0292189900 W 220100 31 2,228.00 2,088.00 0.00 0.00 1,686 0 52,293 0 _7/N-28 0292191100 W 220100 31 2,088.00 1,945.42 0.00 0.00 16,633 0 515,652 0 1/K-39 0292187800 W 220100 31 2,070.00 1,931.61 0.00 0.00 25,169 0 780,244 0 3-45/M-39 0292181100 W 220100 31 2,186.00 2,034.29 0.00 0.00 5,030 0 155,944 0 3-47/0-35 0292156900 W 220100 31 2,116.00 1,970.45 0.00 0.00 9,200 0 285,230 0 4-04/T-26 0292196800 W 220100 31 2,142.00 1,998.71 0.00 0.00 5,573 0 172,763 0 4-08/P-27 0292169200 W 220100 31 1,741.00 1,626.77 0.00 0.00 10,832 0 335,820 0 4-14/R-34 0292186300 W 220100 31 1,906.00 1,810.77 0.00 0.00 9,132 0 283,116 0 4-40/P-43 0292226500 W 220100 27 2,191.00 1,907.07 0.00 0.00 2,651 0 71,581 0 4-44/M-44 0292225400 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 4-48/K -43 0292197200 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 5-01/SD-07 0292051800 G 220100 31 4,599.00 4,354.26 0.00 0.00 0 70,935 0 2,199,001 5-02lSD-10 0292064000 W 220100 31 1,955.00 1,841.97 0.00 0.00 13,110 0 406,427 0 220100 Pool Injection Totals...................... 7,121,608 9,542,119 Form 1 0-406 Endicott Operating Area Endicott Tubing Pressure Casing Pressure Max Average Max Average PSIG PSIG PSIG PSIG Run Date: 06/04/97 Run Time: 12:58:06 BP Exploration (Alaska) Inc. API C Field Days Number L & Pool In 50- S Code Oper. END Gathering Center Totals.......................................... Well Name Field Injection Total........................................................................... ..... e ~ t ,0 2 c- Qo c: m >e> z n ~I» :;:rCl) 1 rn e 0° <.D ....0 I»::::J < (Q CI) --' cþ' c:.o C') c.o rn 0 3 ...... 3 C) iii" !!.!. g Form 10-406 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Injection Report 20 AAC 25.432 Daily Average Injection Liquid Gas BBL MCF . , Page 2 May, 1997 Total Monthly Injection Liquid Gas BBL MCF 7,123,592 9,542,119 7,123,592 9,542,119 Run Date: Run Time: PA OA 06/04/97 12:59:38 SDN END e e ~ ,. ~ .her. fiil i~ pj§ 'æ~ ,. :!f ~ ~. ::i BP Exploration (Alaska) Inc. Oil Movement Accounting & Reporting Alaska Oil and Gas Conservation Commission Oil Reconciliation Report From Date: To Date: 5/1/97 5/31/97 Description Pipeline Deliveries, END TOTAL PIPELINE DELIVERIES NGL Deliveries, END TOTAL NGL DELIVERIES Allocation of SLP to EPA Load Diesel, SON Upstream Losses, SON Downstream Losses, SON TOTAL FIELD PRODUCTION c:... Ii / (0 èZ ~ .:=tJ '"77 :;; """" ~ c::, I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed: fauJ O. t1¡ Title: rw=. ÝIY-, ¡UJr t~ Page 1 Oil Volume 1,969,348 1,969,348 -134,828 -134,828 -1,813,123 o o o 21,397 Date: 6/s/?J Report # SUMDÙO - 05 . STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 MC 25.230 BP EXPLORATION (ALASKA), INC. Name of Operator SAG DELTA NORTH PRODUCTION FACILITY GAS LIQUIDS May 1997 Field and Pool Month and Year of Production 1. WELL 2. API NUMBER C 4. FIELD 6. DAYS 7. GAS-OIL 8. TUBING DAILY AVERAGE PRODUCTION NO. 50- L & POOL METI- IN RATIO PSIG 9. OIL 110. WATER ". GAS S CODE OPER (BPD) (BPD) (MCF) 029-0000006 P 220150 7 31 N/A N/A 5.7 0 0 e e I hereby certify that the foregoing is true and correct to the best of my knowledge Signed: tvul f1 (J¡ 15. Title: Manager. Volume, Royalty & Severance Date: ~/<¡'1 TOTAL FORM 10-405 REV 12- 1-85 TOTAL MONTHLY PRODUCTION 12. OIL 113. WATER 114. GAS (BBL) (BBL) (MCF) 176 o o 176 o o SUBMIT IN DUPLICATE Run Date: 06/04/97 Run Time: 12:57:33 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Production Report BP Exploration (Alaska) Inc. Well API C Field M Days Gas-Oil Name Number L & Pool T . In Ratio 50- S Code H Oper. 2-32/SN-03 2208400 0 220150 2 31 625 2-38/SN-01 2209000 0 220150 2 31 626 220150 Sag Delta North Pool Production Totals.......................... e r;: . e ~ ~.Q'e c:... ;'() Be? ~ &"ci /"r-, ¡;jo I ~ Wl.fJ <.0 f èi:t ....... Si ~ ~ ~. ~ ;::¡. c::, .:::; Form 10-405 20 AAC 25.230 Endicott Operating Area Daily Average Production Oil Water Gas BBL BBL MCF Tubing PSIG 288 290 273 417 865 4,718 171 261 Page 3 May, 1997 Total Monthly Production Oil Water Gas BBL BBL MCF 8,469 12,928 26,804 146,257 5,296 8,092 21,397 173,061 13,388 Run Date: 06/04/97 Run Time: 12:58:31 BP Exploration (Alaska) Inc. API C Field Number L & Pool 50- S Code 1-11/SN-04 0292210700 W 220150 5-03/SD-09 0292063900 W 220150 220150 Pool Injection Totals...................... Well Name eo Gathering Center Totals.......................................... Days In Oper. 31 31 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Injection Report 20 AAC 25.432 Endicott Operating Area Sag Delta North Unit Tubing Pressure Casing Pressure Daily Average Injection Max Average Max Average Liquid Gas PSIG PSIG PSIG PSIG BBL MCF 2,085.00 1,651.00 1,986.68 1,594.42 0.00 0.00 0.00 0.00 4,369 3,449 Field Injection Total................................................................................ ~ s. ~ c:.... ~ :bOIl c:::- e #, .::: ".., ~f;¡ I f"') (~ ii (0 ,..." (t'. -- r:: ~ Ë <0 ~ ~ i '" ,..." ~. t:1 ::I Form 10-406 . " " Page 1 May, 1997 Total Monthly Injection Liquid Gas BBL MCF o o 135,466 106,948 242,414 o o o 242,414 o 242,414 o RYf1 Date: 07/07/97 Rlìh Time: 11 :51 :26 PA EPA OA END BP Exploration (Alaska) Inc. Oil Movement Accounting & Reporting Alaska Oil and Gas Conservation Commission Oil Reconciliation Report From Date: To Date: 6/1/97 6/30/97 Description Pipeline Deliveries, END Oil Volume 1,765,896 TOTAL PIPELINE DELIVERIES 1 ,765,896 NGL Deliveries, END -116,511 - TOTAL NGL DELIVERIES -116,511 Allocation of SLP to SDN -21,182 Load Diesel, EPA -157 Upstream Losses, EPA 0 Downstream Losses, EPA 0 TOTAL FIELD PRODUCTION 1,628,046 e I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed: Vuuf O. ~ Date: Title:~. VcX.( (2ðy i ~ Page 1 1 /B #7 Report # SUMDUD' - 05 BP EXPLORATION (ALASKA), INC. Name of Operator STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 MC 25.230 ENDICOTT PRODUCTION FACILITY GAS LIQUIDS Field and Pool 1. WELL NO. 2. API NUMBER 3. C 4. FIELD 5 6. DAYS 7. GAS-OIL 8. TUBING DAILY AVERAGE PRODUCTION 50- L & POOL MET!- IN RATIO PSIG 9. OIL 110. WATER ". GAS S CODE OPER (BPD) (BPD) (MCF) e 029-o00ooo2 P 220100 7 30 N/A N/ A 3877.8 o e o 15. I hereby certify that the foregoing is true and correct to the best of my knowledge ~gned: tOld rJ. ~ Title: Manager. Volume, Royalty & Severance Date: Î~/Ifl TOTAL 116,335 o o FORM 10-405 REV 12-1-85 Jun 1997 Month and Year of Production TOTAL MONTHLY PRODUCTION 12. OIL 113. WATER 1 14. GAS (BBL) (BBL) (MCF) 116,335 o o SUBMIT IN DUPLICATE State of Alaska Run Date: 07/07/97 Alaska Oil and Gas Conservation Commission Run Time: 11 :56:57 Monthly Production Report 20 AAC 25.230 Page 1 BP Exploration (Alaska) Inc. Endicott Operating Area June, 1997 Daily Average Production Total Monthly Production Well API C Field M Days Gas-Oil Tubing Oil Water Gas Oil Water Gas Name Number L & Pool T In Ratio PSIG BBL BBL MCF BBL BBL MCF 50- S Code H Oper. 1-01/J-19 2180100 0 220100 1 30 7,896 818 2,410 2,042 19,029 72,300 61,254 570,880 1-03/P-16 2260100 0 220100 1 11 9,223 995 539 2,924 4,975 5,934 32,163 54,729 1-09A/L-21 2174301 0 220100 1 30 790 279 1,903 608 1,503 57,089 18,249 45,100 1-17A/1-17 2210001 0 220100 2 12 5,297 265 613 2,991 3,248 7,358 35,893 38,977 .9/1-18 2256900 0 220100 1 22 1,272 353 353 8,729 449 7,770 192,041 9,881 1/K-25 2200500 0 220100 1 30 3,370 303 601 35 2,025 18,021 1,040 60,739 1-25A/K-22 2172201 0 220100 1 28 1,349 349 1,262 58 1,702 35,341 1,612 47,668 1-27/P-20 2169300 0 220100 1 29 8,200 1,606 1,619 3,483 13,271 46,937 101,019 384,868 1-29/M-25 2166900 0 220100 1 30 7,617 433 2,474 3,160 18,846 74,227 94,802 565,387 1-31/M-21 2256200 0 220100 1 29 1,060 386 578 4,948 613 16,765 143,501 17,767 1-33/M-23 2257700 0 220100 1 30 741 280 460 3,798 341 13,796 113,954 10,224 1-35/0-25 2167200 0 220100 1 11 1,626 1 ,428 804 663 1,308 8,848 7,289 14,391 1-39/P-17 2182700 0 220100 2 29 5,423 717 310 6,677 1,679 8,979 193,619 48,689 1-45/0-26 2199100 0 220100 8 0 0 0 0 0 0 0 0 0 1-47/0-21 2162500 0 220100 8 0 0 0 0 0 0 0 0 0 1-49/P-21 2184100 0 220100 1 27 1,973 510 373 6,828 736 10,070 184,369 19,871 1-55/R-25 2178800 0 220100 8 0 0 0 0 0 0 0 0 0 1-57/R-23 2187300 0 220100 8 0 0 0 0 0 0 0 0 0 1-61/0-20 2252000 0 220100 1 23 10,483 1,310 1 ,400 8,568 14,672 32,191 197,059 337,449 1-63fT -22 2190500 0 220100 1 17 9,820 1,581 1,787 2,513 17,549 30,379 42,720 298,336 1-65/N-25 2262700 0 220100 1 30 8,578 2,110 1,633 1,894 14,008 48,991 56,819 420,236 1-67 fT -20 2198500 0 220100 1 15 1,353 612 57 6,261 78 861 93,919 1,165 .4/M-19 2158500 0 220100 1 30 5,788 423 2,370 5,963 13,716 71,090 178,889 411,483 8/K-16 2177100 0 220100 2 30 994 299 1,054 4,287 1,048 31,610 128,601 31,431 2-14/0-16 2163900 0 220100 1 30 5,896 477 3,610 9,251 21,282 108,287 277,522 638,473 2-18/L-16 2203200 0 220100 1 29 8,553 386 1,689 10,198 14,445 48,980 295,756 418,913 2-20/L -15 2204800 0 220100 2 23 3,057 279 359 32 1,098 8,263 726 25,256 2-26/N-14 2181500 0 220100 8 0 0 0 0 0 0 0 0 0 2-28/P-19 2184700 0 220100 1 27 3,347 865 2,446 2,788 8,186 66,034 75,268 221,027 2-36/0-14 2201400 0 220100 1 14 10,498 1,178 1,959 4,255 20,568 27,428 59,575 287,946 2-40/S-22 2252700 0 220100 1 3 14,594 319 108 117 1,581 325 351 4,743 2-42/P-13 2189200 0 220100 1 4 5,830 269 143 13 832 571 52 3,329 2-46A/R-10 2192101 0 220100 8 0 0 0 0 0 0 0 0 0 2-48/0-13 2261200 0 220100 1 30 9,049 2,542 2,234 1,718 20,213 67,007 51,534 606,379 2-50/U-08 2236700 0 220100 2 30 2,884 320 828 1,501 2,389 24,849 45,034 71,671 2-52/S-14 2175000 0 220100 1 3 20,317 1,778 296 252 6,021 889 756 18,062 2-58/S-09 2204100 0 220100 2 30 12,297 310 420 593 5,170 12,613 17,786 155,099 2-60/U-13 2237500 0 220100 2 30 794 266 370 1 ,455 294 11,114 43,663 8,822 Form 10-405 State of Alaska Run Date: 07/07/97 Alaska Oil and Gas Conservation Commission Run Time: 11 :56:57 Monthly Production Report 20 AAC 25.230 Page 2 BP Exploration (Alaska) Inc. Endicott Operating Area June, 1997 Daily Average Production Total Monthly Production Well API C Field M Days Gas-Oil Tubing Oil Water Gas Oil Water Gas Name Number L & Pool T In Ratio PSIG BBL BBL MCF BBL BBL MCF 50- S Code H Oper. 2-62/0-17 2164800 0 220100 8 0 0 0 0 0 0 0 0 0 2-68/S-17 2185800 0 220100 8 0 0 0 0 0 0 0 0 0 3-01/N-29 2167800 0 220100 8 0 0 0 0 0 0 0 0 0 3-03/J-33 2230600 0 220100 1 18 15,942 2,029 636 58 10,131 11 ,439 1,043 182,356 .5/0-29 2162400 0 220100 2 30 4,032 321 478 1,555 1,925 14,325 46,654 57,754 9/L-28A 2178001 0 220100 1 30 1,193 422 4,068 6,084 4,852 122,050 182,519 145,547 3-11/M-30 2184800 0 220100 2 29 1,157 316 1,045 4,363 1,210 30,308 126,533 35,079 3-15/K-33 2175100 0 220100 1 30 6,218 1,246 3,794 10,475 23,595 113,831 314,255 707,835 3-17/J-30A 2194601 0 220100 1 2 63,931 943 15 156 927 29 312 1,854 3-19/R-28 2246300 0 220100 8 0 0 0 0 0 0 0 0 0 3-21/L-34 2171400 0 220100 2 11 1,268 306 386 5,724 490 4,246 62,967 5,386 3-23/N-32 2164500 0 220100 8 0 0 0 0 0 0 0 0 0 3-25/M-27 2212500 0 220100 2 30 10,993 623 1,207 2,563 13,264 36,197 76,891 397,917 3-27/M-33 2158600 0 220100 2 30 984 313 2,052 2,687 2,019 61,572 80,617 60,568 3-29/J-32 2210600 0 220100 1 30 646 324 1,541 4,942 995 46,228 148,257 29,861 3-33/K-37 2166800 0 220100 2 6 873 286 126 2,949 110 756 17,694 660 3-35/L -36 2170100 0 220100 8 0 0 0 0 0 0 0 0 0 3-37/L-35 2255400 0 220100 1 5 769 284 308 1 ,438 237 1,540 7,189 1,184 3-39A/1-37 2176401 0 220100 1 9 2,232 349 922 65 2,058 8,301 584 18,525 3-43/P-36 2241600 0 220100 8 0 0 0 0 0 0 0 0 0 3-49A1M-40 2173502 0 220100 2 30 981 287 1,032 113 1,012 30,945 3,397 30,360 4-02/0-28 2178900 0 220100 1 27 17,761 1,105 1,034 2,097 18,372 27,929 56,622 496,057 t6A10-30 2172301 0 220100 2 30 4,784 433 844 4,126 4,036 25,307 123,770 121,065 0/M-28 2246400 0 220100 1 30 11,595 2,489 2,551 155 29,581 76,538 4,658 887,427 -18/S-30 2189600 0 220100 8 0 0 0 0 0 0 0 0 0 4-20/M-35 2164001 0 220100 8 0 0 0 0 0 0 0 0 0 4-26/0-34 2183500 0 220100 8 0 0 0 0 0 0 0 0 0 4-28/N-37 2187000 0 220100 8 0 0 0 0 0 0 0 0 0 4-32/K-38 2255900 0 220100 1 30 544 289 454 2,615 247 13,611 78,446 7,411 4-34/0-38 2270500 0 220100 8 0 0 0 0 0 0 0 0 0 4-38/K-34 2248200 0 220100 8 0 0 0 0 0 0 0 0 0 4-42/P-38 2173100 0 220100 2 8 2,512 314 168 5,595 422 1,343 44,756 3,373 4-46/N-39 2195700 0 220100 2 30 3,985 393 888 2,304 3,538 26,634 69,124 106,139 4-50/K-41 2194000 0 220100 8 0 0 0 0 0 0 0 0 0 220100 Endicott Pool Production Totals.......................... 1 ,628,046 4,193,123 9,145,349 Form 10-405 State of Alaska Run Date: 07/07/97 Alaska Oil and Gas Conservation Commission Run Time: 11 :52: 19 Monthly Injection Report 20 AAC 25.432 Page 1 BP Exploration (Alaska) Inc. Endicott Operating Area Endicott June, 1997 Tubing Pressure Casing Pressure Daily Average Injection Total Monthly Injection Well API C Field Days Max Average Max Average Liquid Gas Liquid Gas Name Number L & Pool In PSIG PSIG PSIG PSIG BBL MCF BBL MCF 50- S Code Oper. 2-02/P-18 0292156800 0 220036 6 1,380.00 646.33 0.00 0.00 769 0 4,619 0 220036 Pool Injection Totals...................... 4,619 0 1-05/0-20 0292160500 G 220100 30 4,476.00 4,310.73 0.00 0.00 0 76,825 0 2,304,776 _ 5/P-25 0292236100 G 220100 30 4,476.00 4,310.73 0.00 0.00 0 21 ,422 0 642,672 3/0-15 0292251000 W 220100 30 2,105.00 1,746.80 0.00 0.00 14,339 0 430,195 0 1-37/P-24 0292174800 W 220100 30 2,076.00 1,736.87 0.00 0.00 8,482 0 254,488 0 1-41/0-23 0292171300 W 220100 30 1,956.00 1,674.67 0.00 0.00 9,880 0 296,410 0 1-43/P-26 0292186400 W 220100 30 2,079.00 1,741.00 0.00 0.00 6,136 0 184,095 0 1-51N-20 0292230400 W 220100 30 2,127.00 1,755.33 0.00 0.00 1,580 0 47,408 0 1-69N-19 0292202000 W 220100 30 2,107.00 1,745.70 0.00 0.00 2,035 0 61,065 0 2-06/J-22 0292169900 G 220100 30 4,476.00 4,310.73 0.00 0.00 0 102,388 0 3,071,646 2-12/0-16 0292230200 G 220100 30 4,476.00 4,310.73 0.00 0.00 0 15,441 0 463,230 2-16/M-16 0292188500 W 220100 30 2,038.00 1,704.30 0.00 0.00 11,625 0 348,756 0 2-22/L-14 0292193100 W 220100 30 2,068.00 1,730.87 0.00 0.00 9,545 0 286,350 0 2-24/M-12 0292241800 W 220100 23 2,119.00 1,745.87 0.00 0.00 616 0 14,184 0 2-30/0-09 0292222800 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 2-34/P-14 0292166200 W 220100 30 2,058.00 1,723.03 0.00 0.00 12,910 0 387,309 0 2-44/R-12 0292176700 W 220100 8 1,969.00 1,829.00 0.00 0.00 28 0 230 0 2-54/0-12 0292221800 W 220100 30 2,037.00 1,692.93 0.00 0.00 16,476 0 494,301 0 2-64/U-10 0292205500 W 220100 30 2,133.00 1,759.97 0.00 0.00 696 0 20,898 0 2-70/U-15 0292189900 W 220100 14 2,148.00 1,889.21 0.00 0.00 579 0 8,115 0 .7/N-28 0292191100 W 220100 30 1,981.00 1,743.53 0.00 0.00 13,658 0 409,769 0 1/K-39 0292187800 W 220100 30 1,971.00 1,739.00 0.00 0.00 19,032 0 570,966 0 3-45/M-39 0292181100 W 220100 30 2,072.00 1,814.20 0.00 0.00 3,604 0 108,131 0 3-47/0-35 0292156900 W 220100 30 2,020.00 1,777.70 0.00 0.00 7,058 0 211,761 0 4-04ff -26 0292196800 W 220100 29 2,035.00 1,788.03 0.00 0.00 3,647 0 105,791 0 4-08/P-27 0292169200 W 220100 29 1,599.00 1,472.69 0.00 0.00 7,971 0 231,171 0 4-14/R-34 0292186300 W 220100 30 1,847.00 1 ,675.70 0.00 0.00 7,123 0 213,701 0 4-40/P-43 0292226500 W 220100 30 2,086.00 1 ,836.33 0.00 0.00 1,491 0 44,748 0 4-44/M-44 0292225400 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 4-48/K-43 0292197200 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 5-01/SD-07 0292051800 G 220100 30 4,476.00 4,310.73 0.00 0.00 0 55,022 0 1,650,689 5-02/SD-10 0292064000 W 220100 30 1,929.00 1,629.93 0.00 0.00 10,204 0 306,125 0 220100 Pool Injection Totals...................... 5,035,967 8,133,013 Form 10-406 Run Date: 07/07/97 Run Time: 11:52:19 BP Exploration (Alaska) Inc. API C Field Days Number L & Pool In 50- S Code Oper. END Gathering Center Totals.......................................... Well Name State of Alaska Alaska Oil and Gas Conservation Commission Monthly Injection Report 20 MC 25.432 Endicott Operating Area Endicott Tubing Pressure Casing Pressure Max Average Max Average PSIG PSIG PSIG PSIG Field Injection Total................................................................................ e e Form 10-406 Daily Average Injection Liquid Gas BBL MCF Page 2 June, 1997 Total Monthly Injection Liquid Gas BBL MCF 5,040,586 8,133,013 5,040,586 8,133,013 Run Date: 07/07/97 Run Tjme: 11 :43:31 PA SDN OA END BP Exploration (Alaska) Inc. Oil Movement Accounting & Reporting Alaska Oil and Gas Conservation Commission Oil Reconciliation Report From Date: To Date: 6/1/97 6/30/97 Description Pipeline Deliveries, END Oil Volume 1,765,896 TOTAL PIPELINE DELIVERIES 1,765,896 NGL Deliveries, END -116,511 e TOTAL NGL DELIVERIES -116,511 Allocation of SLP to EPA -1,628,203 Load Diesel, SON 0 Upstream Losses, SON 0 Downstream Losses, SON 0 TOTAL FIELD PRODUCTION 21,182 e I hereb, certify that the foregoing is true and correct to the best of my knowledge. Signed: 1tJUl.. (J. , Title: INo/L I/ðt., Ylni «~y. Page 1 Date: -¡ (g/fIJ Report # SUMDUD - 05 BP EXPLORATION (ALASKA), INC. Name of Operator STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 MC 25.230 SAG DELTA NORTH PRODUCTION FACILITY GAS LIQUIDS Jun 1997 Field and Pool Month and Year of Production 1. WELL 2. API NUMBER C 4. FIELD 6. DAYS 7. GAS-OIL 8. TUBING DAILY AVERAGE PRODUCTION NO. 50- L & POOL METI- IN RATIO PSIG 9. OIL 110. WATERI11. GAS S CODE OPER (BPD) (BPD) (MCF) 029-0000006 P 220150 7 30 N/A N/A 5.9 0 0 e e I h",eby ce"1fy that the fmagOlnPl;e and correct to the """ ot my knowledge Signed: Prud f). "'1 Title: Manager. Volume. Royalty & Severance FORM 10-405 REV 12-1-85 15. Date: 7/8!l; TOTAL TOTAL MONTHLY PRODUCTION 12. OIL 113. WATER 114. GAS (BBL) (BBL) (MCF) 176 o o 176 o o SUBMIT IN DUPLICATE Run Date: 07/07/97 Run Time: 11 :56:57 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Production Report BP Exploration (Alaska) Inc. Well API C Field M Days Gas-Oil Name Number L & Pool T In Ratio 50- S Code H Oper. 2-32/SN-03 2208400 0 220150 2 30 626 2-38/SN-01 2209000 0 220150 2 30 626 220150 Sag Delta North Pool Production Totals.......................... e e '<"'.-.", Form 1 0-405 20 AAC 25.230 Endicott Operating Area Daily Average Production Oil Water Gas BBL BBL MCF Tubing PSIG 282 281 356 351 757 4,697 223 220 Page 3 June, 1997 Total Monthly Production Oil Water Gas BBL BBL MCF 10,665 10,517 22,721 140,918 163,639 6,681 6,586 21,182 13,267 Run Date: 07/07/97 Run Time: 11 :53:08 BP Exploration (Alaska) Inc. API C Field Number L & Pool 50- S Code 1-11/SN-04 0292210700 W 220150 5-03/SD-09 0292063900 W 220150 220150 Pool Injection Totals...................... Well Name eo Gathering Center Totals.......................................... Days In Oper. 30 30 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Injection Report 20 MC 25.432 Endicott Operating Area Sag Delta North Unit Tubing Pressure Casing Pressure Daily Average Injection Max Average Max Average Liquid Gas PSIG PSIG PSIG PSIG BBL MCF 2,048.00 1,746.00 1,745.10 1,583.27 0.00 0.00 0.00 0.00 2,268 3,292 Field Injection Total..... ..................... .............. ............ ............................ e Form 10-406 . ,,' , Page 1 June, 1997 Total Monthly Injection Liquid Gas BBL MCF o o 68,057 98,771 166,828 o o o 166,828 o 166,828 o Run Date: Run Time: PA OA 08/05/97 14:33:55 EPA END BP Exploration (Alaska) Inc. Oil Movement Accounting & Reporting Alaska Oil and Gas Conservation Commission Oil Reconciliation Report From Date: To Date: 7/1/97 7/31/97 Description Pipeline Deliveries, END TOTAL PIPELINE DELIVERIES NGL Deliveries, END TOTAL NGL DELIVERIES Allocation of SLP to SON Load Diesel, EPA Upstream Losses, EPA Downstream Losses, EPA TOTAL FIELD PRODUCTION ('r.\ C:i . :,..{ , , '".. ,;) ¿:.". 4 ë'<'~ ~'.'. '/É 't~. v ~) 'G ?! ;". C4j~~ I hereby certify that the foregoing is true and correct to the best of my knowledge. I a;¡j /l d¡ Signed: M6/l. '¡ðb, {lor ¡ SdI: Title: Page 1 Oil Volume 1,654,455 1,654,455 -113,718 -113,718 -20,866 -1 o o 1,519,870 Date: Report # SUMDUb - 05 . ~ft/h BP EXPLORATION (ALASKA), INC. Name of Operator 1. WELL NO. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 MC 25.230 ENDICOTT PRODUCTION FACILITY GAS LIQUIDS Field and Pool 2. API NUMBER 3. C 4. FIELD 5 6. DAYS 7. GAS-OIL 8. TUBING DAILY AVERAGE PRODUCTION 50- L & POOL METI- IN RATIO PSIG 9. OIL 110. WATER ll. GAS S CODE OPER (BPD) (BPD) (MCF) 029-??oo002 P 2201 00 7 31 N/A N/ A 3662.2 o o Signed: I hereby certify that the foregoing is true and correct to the best of my knowledge 100/ P. tf 15. Title: Manager, Volume, Royalty & Severance Date: 2#/'1 TOTAL 113,527 o FORM 10-405 REV 12-1-85 Jul 1997 Month and Year of Production TOTAL MONTHLY PRODUCTION 12. OIL 113. WATERI14. GAS (BBL) (BBL) (MCF) 113,527 o o o SUBMIT IN DUPLICATE State of Alaska Run Date: 08/05/97 Alaska Oil and Gas Conservation Commission Run Time: 14:39:11 Monthly Production Report 20 AAC 25.230 Page 1 BP Exploration (Alaska) Inc. Endicott Operating Area July, 1997 Daily Average Production Total Monthly Production Well API C Field M Days Gas-Oil Tubing Oil Water Gas Oil Water Gas Name Number L & Pool T In Ratio PSIG BBL BBL MCF BBL BBL MCF 50- S Code H Oper. 1-01/J-19 2180100 0 220100 1 30 8,410 942 1,867 1,951 15,703 56,018 58,523 471,094 1-03/P-16 2260100 0 220100 1 31 3,849 1,548 1,196 4,720 4,605 37,091 146,328 142,745 1-09A/L-21 2174301 0 220100 1 31 1,194 283 1,729 849 2,064 53,597 26,327 63,999 1-17 A/I-17 2210001 0 220100 8 0 0 0 0 0 0 0 0 0 1-19/1-18 2256900 0 220100 1 31 1,017 392 430 10,213 437 13,328 316,606 13,549 1-21/K-25 2200500 0 220100 1 21 7,205 321 536 35 3,861 11,255 738 81,088 1-25A/K-22 2172201 0 220100 1 31 3,464 306 1,056 128 3,656 32,722 3,965 113,349 1-27/P-20 2169300 0 220100 1 18 4,053 877 1,964 5,123 7,959 35,352 92,216 143,268 1-29/M-25 2166900 0 220100 1 31 7,378 456 2,594 3,005 19,134 80,400 93,165 593,158 1-31/M-21 2256200 0 220100 1 30 1,114 397 540 4,852 602 16,210 145,554 18,054 1-33/M-23 2257700 0 220100 1 31 395 278 459 4,624 181 14,220 143,358 5,618 1-35/0-25 2167200 0 220100 1 20 5,011 1,822 1,063 864 5,327 21,258 17,272 106,530 1-39/P-17 2182700 0 220100 2 31 6,777 941 426 6,782 2,890 13,218 210,233 89,579 1-45/0-26 2199100 0 220100 8 0 0 0 0 0 0 0 0 0 1-47/0-21 2162500 0 220100 8 0 0 0 0 0 0 0 0 0 1-49/P-21 2184100 0 220100 1 31 5,862 539 329 8,995 1,930 10,206 278,856 59,824 1-55/R-25 2178800 0 220100 8 0 0 0 0 0 0 0 0 0 1-57/R-23 2187300 0 220100 8 0 0 0 0 0 0 0 0 0 1-61/0-20 2252000 0 220100 1 12 17,034 288 1,368 16,491 23,307 16,419 197,889 279,679 1-63/T -22 2190500 0 220100 1 30 8,314 1,754 1,834 2,249 15,249 55,022 67,456 457,467 1-65/N-25 2262700 0 220100 1 26 7,788 1,570 1,019 1,373 7,935 26,491 35,703 206,321 1-67/T-20 2198500 0 220100 1 22 1,093 647 82 8,293 89 1,798 182,452 1,965 2-04/M-19 2158500 0 220100 1 31 6,335 462 2,296 5,925 14,549 71,189 183,687 451,006 2-08/K-16 2177100 0 220100 2 31 1,055 299 1,025 5,291 1,081 31,785 164,024 33,524 2-14/0-16 2163900 0 220100 1 29 6,132 509 4,245 8,587 26,031 123,117 249,031 754,903 2-18/L-16 2203200 0 220100 1 30 8,132 417 1,626 8,895 13,222 48,774 266,854 396,649 2-20/L-15 2204800 0 220100 2 31 3,576 288 397 78 1,419 12,297 2,407 43,977 2-26/N-14 2181500 0 220100 2 1 0 276 0 97 0 0 97 0 2-28/P-19 2184700 0 220100 1 30 7,593 1,085 1 ,446 5,466 10,980 43,382 163,977 329,396 2-36/0-14 2201400 0 220100 1 7 7,485 758 994 2,221 7,443 6,961 15,544 52,100 2-40/S-22 2252700 0 220100 1 1 14,130 285 100 2 1,413 100 2 1,413 2-42/P-13 2189200 0 220100 1 26 7,841 269 131 12 1,031 3,418 301 26,799 2-46A/R-1 0 2192101 0 220100 8 0 0 0 0 0 0 0 0 0 2-48/0-13 2261200 0 220100 1 30 8,397 2,533 2,011 1,807 16,889 60,342 54,211 506,662 2-50/U-08 2236700 0 220100 2 31 2,880 319 774 1,297 2,228 23,983 40,204 69,081 2-52/S-14 2175000 0 220100 1 2 20,128 1,795 176 142 3,533 351 284 7,065 2-58/S-09 2204100 0 220100 2 31 10,042 306 505 466 5,074 15,665 14,456 157,308 2-60/U-13 2237500 0 220100 2 19 718 264 286 1,774 206 5,439 33,706 3,905 Form 1 0-405 State of Alaska Run Date: 08/05/97 Alaska Oil and Gas Conservation Commission Run Time: 14:39:11 Monthly Production Report 20 AAC 25.230 Page 2 BP Exploration (Alaska) Inc. Endicott Operating Area July, 1997 Daily Average Production Total Monthly Production Well API C Field M Days Gas-Oil Tubing Oil Water Gas Oil Water Gas Name Number L & Pool T In Ratio PSIG BBL BBL MCF BBL BBL MCF 50- S Code H Oper. 2-62/0-17 2164800 0 220100 8 0 0 0 0 0 0 0 0 0 2-68/S-17 2185800 0 220100 8 0 0 0 0 0 0 0 0 0 3-01/N-29 2167800 0 220100 2 2 997 466 148 2,408 147 295 4,815 294 3-03/J-33 2230600 0 220100 1 13 15,166 1,853 270 25 4,095 3,510 330 53,232 3-05/0-29 2162400 0 220100 2 31 1,192 306 507 1,430 604 15,703 44,319 18,722 3-09/L-28A 2178001 0 220100 1 31 1,388 403 3,771 7,021 5,233 116,891 217,665 162,224 3-11/M-30 2184800 0 220100 2 31 1,155 306 505 4,345 583 15,650 134,704 18,079 3-15/K-33 2175100 0 220100 1 31 6,275 1,071 2,247 8,987 14,101 69,664 278,593 437,142 3-17B/M-31 2194602 0 220100 1 21 1 ,499 310 581 735 871 12,202 15,442 18,290 3-19/R-28 2246300 0 220100 8 0 0 0 0 0 0 0 0 0 3-21/L-34 2171400 0 220100 2 26 760 322 618 6,112 470 16,080 158,902 12,217 3-23/N-32 2164500 0 220100 8 0 0 0 0 0 0 0 0 0 3-25/M-27 2212500 0 220100 2 31 12,231 623 1,134 2,510 13,866 35,145 77,810 429,848 3-27/M-33 2158600 0 220100 2 31 913 298 1,602 2,532 1,462 49,660 78,477 45,333 3-29/J-32 2210600 0 220100 1 31 644 325 1 ,450 5,028 934 44,953 155,875 28,958 3-33/K-37 2166800 0 220100 2 6 930 285 117 2,980 109 704 17,882 655 3-35/L -36 2170100 0 220100 8 0 0 0 0 0 0 0 0 0 3-37/L-35 2255400 0 220100 1 30 757 287 433 2,002 328 13,002 60,065 9,838 3-39A11-37 2176401 0 220100 1 26 8,693 325 430 15 3,736 11,173 387 97,132 3-43/P-36 2241600 0 220100 8 0 0 0 0 0 0 0 0 0 3-49A/M-40 2173502 0 220100 2 26 847 285 606 178 513 15,759 4,622 13,344 4-02/0-28 2178900 0 220100 1 20 17,378 1,293 957 1,599 16,624 19,132 31,977 332,479 4-06A/O-30 2172301 0 220100 2 31 5,087 442 883 3,922 4,492 27,370 121,567 139,243 4-10/M-28 2246400 0 220100 1 31 11 ,236 2,582 2,125 271 23,881 65,888 8,416 740,298 4-18/S-30 2189600 0 220100 8 0 0 0 0 0 0 0 0 0 4-20/M-35 2164001 0 220100 8 0 0 0 0 0 0 0 0 0 4-26/0-34 2183500 0 220100 8 0 0 0 0 0 0 0 0 0 4-28/N-37 2187000 0 220100 8 0 0 0 0 0 0 0 0 0 4-32/K-38 2255900 0 220100 1 31 780 287 320 2,365 249 9,908 73,310 7,725 4-34/0-38 2270500 0 220100 8 0 0 0 0 0 0 0 0 0 4-38/K-34 2248200 0 220100 1 8 17,850 336 974 40 17,383 7,791 321 139,067 4-42/P-38 2173100 0 220100 2 4 997 303 88 4,536 87 350 18,144 349 4-46/N-39 2195700 0 220100 2 31 3,517 379 891 2,302 3,135 27,632 71,360 97,186 4-50/K-41 2194000 0 220100 8 0 0 0 0 0 0 0 0 0 220100 Endicott Pool Production Totals.......................... 1,519,870 4,780,409 8,482,730 Form 10-405 , ' . State of Alaska Run Date: 08/05/97 Alaska Oil and Gas Conservation Commission Run Time: 14:34:42 Monthly Injection Report 20 AAC 25.432 Page 1 BP Exploration (Alaska) Inc. Endicott Operating Area Endicott July, 1997 Tubing Pressure Casing Pressure Daily Average Injection Total Monthly Injection Well API C Field Days Max Average Max Average Liquid Gas Liquid Gas Name Number L & Pool In PSIG PSIG PSIG PSIG BBL MCF BBL MCF 50- S Code Oper. 2-02/P-18 0292156800 D 220036 7 1,429.00 977 .29 0.00 0.00 435 0 3,046 0 220036 Pool Injection Totals...................... 3,046 0 1-05/0-20 0292160500 G 220100 31 4,470.00 4,268.39 0.00 0.00 0 70,401 0 2,182,434 1-15/P-25 0292236100 G 220100 31 4,470.00 4,268.39 0.00 0.00 0 18,391 0 570,150 1-23/0-15 0292251000 W 220100 31 2,185.00 2,021.65 0.00 0.00 20,202 0 626,282 0 1-37/P-24 0292174800 W 220100 29 2,198.00 2,054.14 0.00 0.00 8,743 0 253,556 0 1-41/0-23 0292171300 W 220100 31 2,021.00 1,891.16 0.00 0.00 14,849 0 460,340 0 1-43/P-26 0292186400 W 220100 31 2,157.00 2,001.61 0.00 0.00 12,225 0 378,982 0 1-51N-20 0292230400 W 220100 31 2,214.00 2,043.55 0.00 0.00 3,236 0 100,334 0 1-69N-19 0292202000 W 220100 31 2,186.00 2,021.10 0.00 0.00 4,618 0 143,163 0 2-06/J-22 0292169900 G 220100 31 4,470.00 4,268.39 0.00 0.00 0 95,071 0 2,947,210 2-12/Q-16 0292230200 G 220100 31 4,470.00 4,268.39 0.00 0.00 0 13,991 0 433,750 2-16/M-16 0292188500 W 220100 31 2,109.00 1,956.61 0.00 0.00 16,442 0 509,713 0 2-22/L -14 0292193100 W 220100 31 2,080.00 1,943.32 0.00 0.00 13,377 0 414,717 0 2-24/M-12 0292241800 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 2-30/0-09 0292222800 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 2-34/P-14 0292166200 W 220100 31 2,131.00 1,976.45 0.00 0.00 17,027 0 527,862 0 2-44/R-12 0292176700 W 220100 27 2,215.00 2,096.48 0.00 0.00 96 0 2,598 0 2-54/Q-12 0292221800 W 220100 31 2,102.00 1,944.81 0.00 0.00 20,839 0 646,026 0 2-64/U-1 0 0292205500 W 220100 31 2,220.00 2,047.58 0.00 0.00 1,421 0 44,063 0 2-70/U-15 0292189900 W 220100 27 2,236.00 2,114.19 0.00 0.00 1,718 0 46,387 0 3-07/N-28 0292191100 W 220100 31 2,061.00 1,909.35 0.00 0.00 15,572 0 482,757 0 3-41/K-39 0292187800 W 220100 31 2,055.00 1,909.19 0.00 0.00 25,981 0 805,412 0 3-45/M-39 0292181100 W 220100 31 2,164.00 1,999.94 0.00 0.00 4,191 0 129,951 0 3-47/Q-35 0292156900 W 220100 31 2,116.00 1,959.84 0.00 0.00 8,356 0 259,039 0 4-04fT -26 0292196800 W 220100 31 2,125.00 1,966.84 0.00 0.00 5,528 0 171,398 0 4-08/P-27 0292169200 W 220100 31 1,618.00 1,549.52 0.00 0.00 9,526 0 295,310 0 4-14/R-34 0292186300 W 220100 31 1,896.00 1,793.03 0.00 0.00 8,529 0 264,414 0 4-40/P-43 0292226500 W 220100 31 2,178.00 2,017.84 0.00 0.00 3,175 0 98,443 0 4-44/M-44 0292225400 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 4-48/K-43 0292197200 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 5-01/SD-07 0292051800 G 220100 31 4,470.00 4,268.39 0.00 0.00 0 42,530 0 1 ,318,456 5-02/SD-10 0292064000 W 220100 31 1,964.00 1,819.84 0.00 0.00 13,392 0 415,174 0 220100 Pool Injection Totals...................... 7,075,921 7,452,000 Form 10-406 Run Date: 08/05/97 Run Time: 14:34:42 BP Exploration (Alaska) Inc. API C Field Days Number L & Pool In 50- S Code Oper. END Gathering Center Totals.......................................... Well Name State of Alaska Alaska Oil and Gas Conservation Commission Monthly Injection Report 20 MC 25.432 Endicott Operating Area Endicott Tubing Pressure Casing Pressure Max Average Max Average PSIG PSIG PSIG PSIG Field I njection Total................................................................................ Form 10-406 Daily Average Injection Liquid Gas BBL MCF . ~ þ .. Page 2 July, 1997 Total Monthly Injection Liquid Gas BBL MCF 7,078,967 7,452,000 7,078,967 7,452,000 Run Date: Run Time: PA OA 08/05/97 14:29:44 SDN END S"f7;> r:;?] tf"F:. l~\ F· t;:,.) i';Y (;c .'!.I') BP Exploration (Alaska) Inc. Oil Movement Accounting & Reporting Alaska Oil and Gas Conservation Commission Oil Reconciliation Report From Date: To Date: 7/1/97 7/31/97 Description Pipeline Deliveries, END TOTAL PIPELINE DELIVERIES NGL Deliveries, END TOTAL NGL DELIVERIES Allocation of SLP to EPA Load Diesel, SON Upstream Losses, SDN Downstream Losses, SON TOTAL FIELD PRODUCTION c:::; ~ Ir",: 0..",;. Ff',; f""') r-;r",' ""- . "'. k"4'r,: t). ~i:::Y cert~ thaï;¡go;~ i~ and correct to the best of :~ekn;:~e. ~I ~r ,~. Page 1 Oil Volume 1,654,455 1,654,455 -113,718 -113,718 -1,519,871 o o o 20,866 Date: Report # SUMDUD - 05 B/Þk1 BP EXPLORATION (ALASKA), INC. Name of Operator 1. WELL NO. 2. API NUMBER C 50- L S STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 MC 25.230 SAG DELTA NORTH PRODUCTION FACILITY GAS LIQUIDS Jul1997 Field and Pool Month and Year of Production 4. FIELD 6. DAYS 7. GAS-OIL 8. TUBING DAILY AVERAGE PRODUCTION & POOL MET!- IN RATIO PSIG 9. OIL 110. WATER ". GAS CODE OPER (BPD) (BPD) (MCF) 029-0000006 P 220150 7 31 N/A N/A 6.2 o o I hereby certify that the foregoing is true and correct to the best of my knowledge ~gned: þlL, Title: Manager, Volume. Royalty & Severance FORM 10-405 REV 12-1-85 15. Date: eÄÞJ TOTAL TOTAL MONTHLY PRODUCTION 12. OIL 113. WATER 114. GAS (BBL) (BBL) (MCF) 191 o o 191 o o SUBMIT IN DUPLICATE Run Date: 08/05/97 Run Time: 14:39:11 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Production Report BP Exploration (Alaska) Inc. Well API C Field M Days Gas-Oil Name Number L & Pool T In Ratio 50- S Code H Oper. 2-32/SN-03 2208400 0 220150 2 31 625 2-38/SN-01 2209000 0 220150 2 31 626 220150 Sag Delta North Pool Production Totals.......................... Form 10-405 20 MC 25.230 Endicott Operating Area Daily Average Production Oil Water Gas BBL BBL MCF Tubing PSIG 282 278 296 377 762 4,577 185 236 Page 3 July, 1997 Total Monthly Production Oil Water Gas BBL BBL MCF 9,175 11,691 20,866 23,628 141,893 5,738 7,320 165,521 13,058 Run Date: 08/05/97 Run Time: 14:28:01 BP Exploration (Alaska) Inc. API C Field Number L & Pool 50- S Code 1-11/SN-04 0292210700 W 220150 5-03/SD-09 0292063900 W 220150 220150 Pool Injection Totals...................... Well Name END Gathering Center Totals.......................................... Days In Oper. 31 31 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Injection Report 20 AAC 25.432 Endicott Operating Area Sag Delta North Unit Tubing Pressure Casing Pressure Daily Average Injection Max Average Max Average Liquid Gas PSIG PSIG PSIG PSIG BBL MCF 2,060.00 1,724.00 1,949.71 1,666.48 0.00 0.00 0.00 0.00 4,812 4,350 Field I njection Total................................................................................ Form 1 0-406 , . Page 1 July, 1997 Total Monthly Injection Liquid Gas BBL MCF o o 149,178 134,853 284,031 o o o 284,031 o 284,031 o Run Date: Run Time: PA OA 09/05/97 11 :15:05 EPA END BP Exploration (Alaska) Inc. Oil Movement Accounting & Reporting Alaska Oil and Gas Conservation Commission Oil Reconciliation Report From Date: To Date: 8/1/97 8/31/97 Description Pipeline Deliveries, END TOTAL PIPELINE DELIVERIES NGL Deliveries, END TOTAL NGL DELIVERIES Allocation of SLP to SON Load Diesel, EPA Upstream Losses, EPA Downstream Losses, EPA TOTAL FIELD PRODUCTION I hereby certify that the foregoing is true and correct to the best of my knowledge. 4J6L ¡I~ fðY' s# Title: Signed: frwl O. êI4 Page 1 Oil Volume 1,660,770 1,660,770 -78,711 -78,711 -20,683 -63 o o 1,561,313 Date: fjÇ)7 - Report # SUMDUD - 05 J':;. [,- (f) .;<:;' ¡1;; S~ 'J) ~? > G) ::;3 p:¡ g..w 00 ;;; s __ cg 0- c..o C? c..o <:> -.,¡ :3 9 U; /(f": ';:;0 rT1 rn '.;~~ ""'...... ....... M,,\ ~:J BP EXPLORATION (ALASKA). INC. Name of Operator 1. WELL NO. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 MC 25.230 ENDICOTT PRODUCTION FACILITY GAS LIQUIDS Field and Pool 2. API NUMBER 3. C 4. FIELD 5 6. DAYS 7. GAS-OIL 8. TUBING DAILY AVERAGE PRODUCTION 50- L & POOL METI- IN RATIO PSIG 9. OIL 110. WATER ll. GAS S CODE OPER (BPD) (BPD) (MCF) 029-0000002 P 220100 7 27 N/A N/A 2910.8 o o ~~:~rtlfy "'P;;."'"~ I, IT'" and correct to the""" of my knowlad"" Date: qkj; 15. Title: Manager. Volume. Royalty & Severance FORM 10-405 REV 12-1-85 TOTAL Aug 1997 Month and Year of Production TOTAL MONTHLY PRODUCTION 12. OIL 113. WATER 14. GAS (BBL) (BBL) (MCF) 78.591 o o 78.591 o 0 SUBMIT IN DUPLICATE State of Alaska Run Date: 09/04/97 Alaska Oil and Gas Conservation Commission Run Time: 15:06:25 Monthly Production Report 20 MC 25.230 Page 1 BP Exploration (Alaska) Inc. Endicott Operating Area August, 1997 Daily Average Production Total Monthly Production Well API C Field M Days Gas-Oil Tubing Oil Water Gas Oil Water Gas Name Number L & Pool T In Ratio PSIG BBL BBL MCF BBL BBL MCF 50- S Code H Oper. 1-01/J-19 2180100 0 220100 1 26 8,038 1,149 2,173 2,116 17,470 56,505 55,004 454,214 1-03/P-16 2260100 0 220100 1 31 5,524 1,610 1,222 3,878 6,748 37,868 120,220 209,191 1-09A1L-21 2174301 0 220100 1 31 1,516 305 1,755 759 2,661 54,414 23,515 82,505 1-17A/1-17 2210001 0 220100 2 16 972 324 338 1,603 328 5,400 25,642 5,249 1-19/1-18 2256900 0 220100 1 27 1,294 318 367 7,638 474 9,902 206,214 12,811 1-21/K-25 2200500 0 220100 1 31 4,814 342 785 63 3,777 24,325 1,938 117,102 1-25A1K-22 2172201 0 220100 1 31 617 276 882 84 544 27,344 2,619 16,858 1-27/P-20 2169300 0 220100 1 28 3,585 903 2,703 6,729 9,689 75,671 188,401 271,304 1-29/M-25 2166900 0 220100 1 30 6,999 485 2,225 2,421 15,572 66,741 72,633 467,150 1-31/M-21 2256200 0 220100 1 26 934 409 565 4,351 528 14,695 113,114 13,724 1-33/M-23 2257700 0 220100 1 20 685 275 201 4,470 138 4,015 89,394 2,750 1-35/0-25 2167200 0 220100 1 15 9,731 1,741 781 658 7,595 11 ,708 9,876 113,927 1-39/P-17 2182700 0 220100 2 28 21,441 809 340 6,904 7,287 9,516 193,303 204,037 1-45/Q-26 2199100 0 220100 8 0 0 0 0 0 0 0 0 0 1-47/Q-21 2162500 0 220100 8 0 0 0 0 0 0 0 0 0 1-49/P-21 2184100 0 220100 1 27 7,998 496 254 7,232 2,031 6,857 195,253 54,843 1-55/R-25 2178800 0 220100 8 0 0 0 0 0 0 0 0 0 1-57/R-23 2187300 0 220100 8 0 0 0 0 0 0 0 0 0 1-61/Q-20 2252000 0 220100 1 31 3,302 825 861 8,320 2,845 26,704 257,926 88,180 1-63/T -22 2190500 0 220100 1 22 10,315 1,650 1,249 1,540 12,887 27,484 33,884 283,510 1-65/N-25 2262700 0 220100 1 28 1,679 1,688 1 ,458 2,911 2,447 40,813 81,499 68,529 1-67/T-20 2198500 0 220100 1 9 3,423 303 108 5,555 369 971 49,996 3,324 2-04/M-19 2158500 0 220100 1 31 6,200 424 1,651 4,700 10,237 51,190 145,710 317,356 2-08/K-16 2177100 0 220100 2 31 1,683 324 657 4,832 1,106 20,378 149,800 34,290 2-14/0-16 2163900 0 220100 1 13 2,946 362 3,024 3,409 8,909 39,308 44,319 115,817 2-18/L-16 2203200 0 220100 1 29 8,179 378 1,583 8,494 12,949 45,915 246,337 375,528 2-20/L-15 2204800 0 220100 2 30 3,111 288 386 30 1,201 11,580 902 36,031 2-26/N-14 2181500 0 220100 8 0 0 0 0 0 0 0 0 0 2-28/P-19 2184700 0 220100 1 24 9,050 792 1,056 4,996 9,559 25,349 119,908 229,415 2-36/0-14 2201400 0 220100 1 28 6,900 753 2,995 6,536 20,663 83,852 183,006 578,564 2-40/S-22 2252700 0 220100 1 15 4,951 301 949 154 4,698 14,233 2,303 70,464 2-42/P-13 2189200 0 220100 8 0 0 0 0 0 0 0 0 0 2-46A1R-10 2192101 0 220100 8 0 0 0 0 0 0 0 0 0 2-48/0-13 2261200 0 220100 1 28 9,417 2,366 2,313 2,176 21,784 64,772 60,938 609,965 2-50/U-08 2236700 0 220100 2 17 3,315 342 602 838 1,996 10,234 14,246 33,929 2-52/S-14 2175000 0 220100 1 4 18,988 1,734 678 506 12,869 2,711 2,023 51,476 2-58/S-09 2204100 0 220100 2 31 10,382 305 465 417 4,832 14,429 12,933 149,805 2-60/U-13 2237500 0 220100 8 0 0 0 0 0 0 0 0 0 Form 1 0-405 State of Alaska Run Date: 09/04/97 Alaska Oil and Gas Conservation Commission Run Time: 15:06:25 Monthly Production Report 20 AAC 25.230 Page 2 BP Exploration (Alaska) Inc. Endicott Operating Area August, 1997 Daily Average Production Total Monthly Production Well API C Field M Days Gas-Oil Tubing Oil Water Gas Oil Water Gas Name Number L & Pool T In Ratio PSIG BBL BBL MCF BBL BBL MCF 50- S Code H Oper. 2-62/0-17 2164800 0 220100 8 0 0 0 0 0 0 0 0 0 2-68/S-17 2185800 0 220100 8 0 0 0 0 0 0 0 0 0 3-01/N-29 2167800 0 220100 8 0 0 0 0 0 0 0 0 0 3-03/J-33 2230600 0 220100 1 27 24,460 1,169 554 45 13,557 14,965 1,211 366,037 3-05/0-29 2162400 0 220100 2 31 1,153 338 521 1,524 600 16,140 47,247 18,602 3-09/L -28A 2178001 0 220100 1 31 1,479 433 3,848 9,282 5,691 119,278 287,732 176,420 3-11/M-30 2184800 0 220100 2 31 951 333 880 4,407 837 27,273 136,612 25,936 3-15/K-33 2175100 0 220100 1 30 3,863 1,009 926 4,495 3,577 27,780 134,855 107,308 3-17B/M-31 2194602 0 220100 1 31 1,533 337 496 1,625 760 15,380 50,360 23,573 3-19/R-28 2246300 0 220100 8 0 0 0 0 0 0 0 0 0 3-21/L-34 2171400 0 220100 2 24 2,176 317 574 5,887 1,248 13,765 141,284 29,949 3-23/N-32 2164500 0 220100 8 0 0 0 0 0 0 0 0 0 3-25/M-27 2212500 0 220100 2 31 14,380 738 1,116 2,450 16,054 34,610 75,938 497,679 3-27/M-33 2158600 0 220100 2 31 771 309 1,396 2,522 1,077 43,274 78,177 33,384 3-29/J-32 2210600 0 220100 1 29 598 352 1,327 5,140 794 38,491 149,068 23,017 3-33/K-37 2166800 0 220100 8 0 0 0 0 0 0 0 0 0 3-35/L -36 2170100 0 220100 8 0 0 0 0 0 0 0 0 0 3-37/L-35 2255400 0 220100 1 31 282 303 624 2,980 176 19,330 92,379 5,460 3-39A/I-37 2176401 0 220100 1 29 1,378 607 5,168 498 7,121 149,859 14,451 206,509 3-43/P-36 2241600 0 220100 8 0 0 0 0 0 0 0 0 0 3-49A/M-40 2173502 0 220100 2 31 1 ,452 290 633 1,133 919 19,627 35,136 28,491 4-02/0-28 2178900 0 220100 1 31 22,862 928 945 1,871 21,596 29,283 57,994 669,472 4-06A/O-30 2172301 0 220100 2 31 5,595 450 533 3,744 2,984 16,535 116,076 92,519 4-1 0/M-28 2246400 0 220100 1 31 12,050 2,436 1,897 256 22,860 58,809 7,923 708,650 4-18/S-30 2189600 0 220100 8 0 0 0 0 0 0 0 0 0 4-20/M-35 2164001 0 220100 2 2 959 365 98 783 94 196 1,565 188 4-26/0-34 2183500 0 220100 8 0 0 0 0 0 0 0 0 0 4-28/N-37 2187000 0 220100 8 0 0 0 0 0 0 0 0 0 4-32/K-38 2255900 0 220100 1 24 330 301 234 2,165 77 5,615 51,966 1,852 4-34/0-38 2270500 0 220100 1 1 71,400 1,363 5 892 357 5 892 357 4-38/K-34 2248200 0 220100 8 0 0 0 0 0 0 0 0 0 4-42/P-38 2173100 0 220100 2 2 5,611 413 45 2,424 253 90 4,847 505 4-46/N-39 2195700 0 220100 2 31 3,124 387 843 1,544 2,633 26,124 47,854 81,620 4-50/K-41 2194000 0 220100 8 0 0 0 0 0 0 0 0 0 220100 Endicott Pool Production Totals.......................... 1,561,313 4,236,423 8,169,376 Form 1 0-405 State of Alaska Run Date: 09/04/97 Alaska Oil and Gas Conservation Commission Run Time: 15:07:40 Monthly Injection Report 20 MC 25.432 Page 1 BP Exploration (Alaska) Inc. Endicott Operating Area Endicott August, 1997 Tubing Pressure Casing Pressure Daily Average Injection Total Monthly Injection Well API C Field Days Max Average Max Average Liquid Gas Liquid Gas Name Number L & Pool In PSIG PSIG PSIG PSIG BBL MCF BBL MCF 50- S Code Oper. 2-02/P-18 0292156800 D 220036 2 1,190.00 701.00 0.00 0.00 2,372 0 4,744 0 220036 Pool Injection Totals...................... 4,744 0 1-05/0-20 0292160500 G 220100 31 4,442.00 4,186.83 0.00 0.00 0 45,514 0 1,410,937 1-15/P-25 0292236100 G 220100 31 4,442.00 4,190.58 0.00 0.00 0 33,954 0 1,052,604 1-23/0-15 0292251000 W 220100 31 2,279.00 2,047.81 0.00 0.00 19,607 0 607,824 0 1-37/P-24 0292174800 W 220100 31 2,280.00 2,063.84 0.00 0.00 8,399 0 260,383 0 1-41/0-23 0292171300 W 220100 31 2,101.00 1,893.32 0.00 0.00 15,129 0 469,006 0 1-43/P-26 0292186400 W 220100 31 2,239.00 2,022.00 0.00 0.00 10,949 0 339,423 0 1-51N-20 0292230400 W 220100 31 2,306.00 2,076.29 0.00 0.00 2,941 0 91,181 0 1-69N-19 0292202000 W 220100 31 2,278.00 2,056.00 0.00 0.00 3,764 0 116,703 0 2-06/J-22 0292169900 G 220100 31 4,442.00 4,186.83 0.00 0.00 0 91,153 0 2,825,770 2-12/0-16 0292230200 G 220100 29 4,442.00 4,208.07 0.00 0.00 0 13,049 0 378,435 2-16/M-16 0292188500 W 220100 12 2,133.00 1,988.58 0.00 0.00 14,798 0 177,584 0 2-22/L-14 0292193100 W 220100 31 2,170.00 1,971.94 0.00 0.00 13,382 0 414,850 0 2-24/M-12 0292241800 W 220100 4 0.00 0.00 0.00 0.00 1,034 0 4,138 0 2-30/0-09 0292222800 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 2-34/P-14 0292166200 W 220100 31 2,216.00 2,002.03 0.00 0.00 17,659 0 547,456 0 2-44/R-12 0292176700 W 220100 31 2,306.00 2,073.19 0.00 0.00 179 0 5,575 0 2-54/0-12 0292221800 W 220100 31 2,206.00 1,985.65 0.00 0.00 20,231 0 627,185 0 2-64/U-10 0292205500 W 220100 31 2,312.00 2,077.42 0.00 0.00 1,624 0 50,346 0 2-70/U-15 0292189900 W 220100 31 2,328.00 2,094.16 0.00 0.00 1,662 0 51,524 0 3-07/N-28 0292191100 W 220100 31 2,111.00 1,944.71 0.00 0.00 15,449 0 478,941 0 3-41/K-39 0292187800 W 220100 31 2,120.00 1,947.35 0.00 0.00 25,600 0 793,624 0 3-45/M-39 0292181100 W 220100 31 2,235.00 2,051.45 0.00 0.00 3,686 0 114,268 0 3-47/0-35 0292156900 W 220100 30 2,185.00 1,995.20 0.00 0.00 8,238 0 247,146 0 4-04rr -26 0292196800 W 220100 31 2,190.00 2,013.16 0.00 0.00 5,559 0 172,351 0 4-08/P-27 0292169200 W 220100 30 1,646.00 1,559.80 0.00 0.00 9,889 0 296,696 0 4-14/R-34 0292186300 W 220100 31 1,980.00 1,836.90 0.00 0.00 8,857 0 274,581 0 4-40/P-43 0292226500 W 220100 31 2,252.00 2,074.13 0.00 0.00 2,674 0 82,900 0 4-44/M-44 0292225400 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 4-48/K-43 0292197200 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 5-01/SD-07 0292051800 G 220100 31 4,442.00 4,186.83 0.00 0.00 0 49,578 0 1,536,933 5-02/SD-10 0292064000 W 220100 31 2,058.00 1,874.71 0.00 0.00 13,130 0 407,048 0 220100 Pool Injection Totals...................... 6,630,733 7,204,679 Form 10-406 Run Date: 09/04/97 Run Time: 15:07:40 BP Exploration (Alaska) Inc. API C Field Days Number L & Pool In 50- S Code Oper. END Gathering Center Totals.......................................... Well Name State of Alaska Alaska Oil and Gas Conservation Commission Monthly Injection Report 20 AAC 25.432 Endicott Operating Area Endicott Tubing Pressure Casing Pressure Max Average Max Average PSIG PSIG PSIG PSIG Field Injection Total................................................................................ > iii" I» ~' '9 (!'"'\ Ro >¡::"e ='ni £Ow s:;: g> .~~ '~.,:;Þ~~~ ~ ~ ~ ø. u;J g> ~ r>i[,)¡ § Cd ü; f}";' Form 1 0-406 Daily Average Injection Liquid Gas BBL MCF Page 2 August, 1997 Total Monthly Injection Liquid Gas BBL MCF 6,635,477 7,204,679 6,635,477 7,204,679 Run Date: Run Time: PA OA 09/05/97 11 : 18:05 SDN END 8/1/97 8/31/97 BP Exploration (Alaska) Inc. Oil Movement Accounting & Reporting Alaska Oil and Gas Conservation Commission Oil Reconciliation Report From Date: To Date: Description Pipeline Deliveries, END Oil Volume 1 ,660,770 TOTAL PIPELINE DELIVERIES 1,660,770 NGL Deliveries, END -78,711 TOTAL NGL DELIVERIES -78,711 Allocation of SLP to EPA -1,561,376 Load Diesel, SON o Upstream Losses, SON o Downstream Losses, SON o TOTAL FIELD PRODUCTION 20,683 I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed: Yau1 O. dJ¡ Title: JI1hL. rItJ.. R4' (!.Ý. Date: Page 1 f/çh Report # SUMDUÒ - 05 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 MC 25.230 BP EXPLORATION (ALASKA), INC. Name of Operator SAG DELTA NORTH PRODUCTION FACILITY GAS LIQUIDS Aug 1997 Field and Pool Month and Year of Production 1. WELL 2. API NUMBER C 4. FIELD 6. DAYS 7. GAS-OIL 8. TUBING DAILY AVERAGE PRODUCTION NO. SO- L & POOL METI- IN RATIO PSIG 9. OIL 110. WATER ll. GAS S CODE OPER (BPD) (BPD) (MCF) 029-0000006 P 220150 7 24 N/A N/A 5.0 0 0 I hereby certify that the fore~ is true and correct to the best of my knowledge Signed: lobi VJ 15. Title: Manager, Volume, Royalty & Severance Date: (/~l TOTAL FORM 10-405 REV 12-1-85 TOTAL MONTHLY PRODUCTION 12. OIL 113. WATER 114. GAS (BBL) (BBL) (MCF) 120 o o 120 o o SUBMIT IN DUPLICATE Run Date: 09/04/97 Run Time: 15:06:25 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Production Report BP Exploration (Alaska) Inc. Well API C Field M Days Gas-Oil Name Number L & Pool T In Ratio 50- S Code H Oper. 2-32/SN-03 2208400 0 220150 2 31 626 2-38/SN-01 2209000 0 220150 2 31 626 220150 Sag Delta North Pool Production Totals.......................... Form 1 0-405 20 AAC 25.230 Endicott Operating Area Daily Average Production Oil Water Gas BBL BBL MCF Tubing PSIG 288 288 271 397 806 4,061 169 248 Page 3 August, 1997 Total Monthly Production Oil Water Gas BBL BBL MCF 8,387 12,296 24,977 125,885 150,862 5,248 7,699 20,683 12,947 Run Date: 09/04/97 Run Time: 15:08:09 BP Exploration (Alaska) Inc. API C Field Number L & Pool 50- S Code 1-11/SN-04 0292210700 W 220150 5-03/SD-09 0292063900 W 220150 220150 Pool Injection Totals...................... Well Name END Gathering Center Totals.......................................... Days In Oper. 31 31 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Injection Report 20 AAC 25.432 Endicott Operating Area Sag Delta North Unit Tubing Pressure Casing Pressure Daily Average Injection Max Average Max Average Liquid Gas PSIG PSIG PSIG PSIG BBL MCF 2,147.00 1,840.00 1,985.10 1,737.81 0.00 0.00 0.00 0.00 4,591 4,674 Field Injection Total................ ...................... ........ ................. ..... ...... ...... Form 10-406 Page 1 August, 1997 Total Monthly Injection Liquid Gas BBL MCF o o 142,348 144,912 287,260 o o o 287,260 o 287,260 o Run Date: Run Time: PA OA 10/03/97 15:22:51 EPA END BP Exploration (Alaska) Inc. Oil Movement Accounting & Reporting Alaska Oil and Gas Conservation Commission Oil Reconciliation Report From Date: To Date: 9/1/97 9/30/97 Description Pipeline Deliveries, END Oil Volume 1,887,726 TOTAL PIPELINE DELIVERIES 1,887,726 NGL Deliveries, END -122,634 TOTAL NGL DELIVERIES -122,634 Allocation of SLP to SON -17,433 Load Diesel, EPA -51 Upstream Losses, EPA o Downstream Losses, EPA o TOTAL FIELD PRODUCTION 1,747,608 I hereby certify that the foregoing is true and correct to the best of my knowledge. Iud I). ffJ¡ Signed: 1i'6/l_ (/(Jt.-( eo'f t/ S¥. Date: Title: Page 1 toÄ/4'1 Report # SUMDUD - 05 BP EXPLORATION (ALASKA), INC. Name of Operator 1. WELL NO. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 ENDICOTT PRODUCTION FACILITY GAS LIQUIDS Field and Pool 2. API NUMBER 3. C 4. FIELD 5 6. DAYS 7. GAS-OIL 8. TUBING DAILY AVERAGE PRODUCTION 50- L & POOL MET - IN RATIO PSIG 9. OIL 110. WATER I 11. GAS S CODE OPER (BPD) (BPD) (MCF) 029-0000002 P 220100 7 30 N/A N/ A 4082.9 o o I hereby certify that the fore~ ; true and correct to the best of my knowledge Signed PU1l1 ( Date: w/6/rtJ 15. Sep 1997 Month and Year of Production TOTAL MONTHLY PRODUCTION 12. OIL 113. WATER I 14. GAS (BBL) (BBL) (MCF) 1 22,487 o o Title: Manager. Volume, Royalty & Severance TOTAL 122,487 o FORM 10-405 REV 12-1-85 o SUBMIT IN DUPLICATE State of Alaska Run Date: 10/03/97 Alaska Oil and Gas Conservation Commission Run Time: 15: 12:42 Monthly Production Report 20 AAC 25.230 Page 1 BP Exploration (Alaska) Inc. Endicott Operating Area September, 1997 Daily Average Production Total Monthly Production Well API C Field M Days Gas-Oil Tubing Oil Water Gas Oil Water Gas Name Number L & Pool T In Ratio PSIG BBL BBL MCF BBL BBL MCF 50- S Code H Oper. 1-01/J-19 2180100 0 220100 1 28 10,519 1,564 1,779 1,605 18,713 49,812 44,943 523,967 1-03/P-16 2260100 0 220100 1 30 6,099 1,893 1 ,433 3,992 8,738 42,977 119,768 262,129 1-09A/L-21 2174301 0 220100 1 25 2,294 304 1,579 662 3,621 39,475 16,541 90,536 1-17A/1-17 2210001 0 220100 2 30 1,020 354 494 845 504 14,813 25,345 15,106 1-19/1-18 2256900 0 220100 1 24 1,126 317 337 6,629 380 8,098 159,103 9,118 1-21/K-25 2200500 0 220100 1 30 5,827 317 739 59 4,306 22,168 1,781 129,165 1-25A/K-22 2172201 0 220100 1 30 627 274 958 95 601 28,749 2,846 18,036 1-27/P-20 2169300 0 220100 1 30 5,641 1,297 2,291 5,791 12,923 68,724 173,726 387,685 1-29/M-25 2166900 0 220100 1 30 6,600 460 3,322 2,801 21,928 99,674 84,041 657,837 1-31/M-21 2256200 0 220100 1 30 1,022 380 426 4,686 436 12,785 140,572 13,070 1-33/M-23 2257700 0 220100 1 19 971 298 114 4,639 111 2,174 88,142 2,110 1-35/0-25 2167200 0 220100 1 18 9,024 1,862 901 686 8,135 16,226 12,343 146,422 1-39/P-17 2182700 0 220100 2 30 7,060 948 608 7,244 4,292 18,240 217,319 128,768 1-45/Q-26 2199100 0 220100 8 0 0 0 0 0 0 0 0 0 1-47/Q-21 2162500 0 220100 8 0 0 0 0 0 0 0 0 0 1-49/P-21 2184100 0 220100 1 20 3,613 453 438 7,631 1,581 8,751 152,625 31,617 1-55/R-25 2178800 0 220100 8 0 0 0 0 0 0 0 0 0 1-57/R-23 2187300 0 220100 8 0 0 0 0 0 0 0 0 0 1-61/Q-20 2252000 0 220100 1 30 4,456 1,148 557 5,565 2,482 16,712 166,960 74,474 1-63rr -22 2190500 0 220100 1 29 10,127 1,784 1,842 2,296 18,648 53,404 66,595 540,800 1-65/N-25 2262700 0 220100 1 29 7,712 2,107 1,622 2,391 12,510 47,040 69,338 362,786 1-67 rr -20 2198500 0 220100 1 5 3,578 301 161 8,686 575 804 43,432 2,877 2-04/M-19 2158500 0 220100 1 30 6,079 399 2,049 5,869 12,458 61,477 176,064 373,742 2-08/K-16 2177100 0 220100 2 30 1,947 361 748 5,590 1 ,455 22,427 167,711 43,655 2-14/0-16 2163900 0 220100 1 30 2,236 384 5,262 9,600 11 ,766 157,872 288,014 352,989 2-18/L-16 2203200 0 220100 1 15 20,655 455 609 8,836 12,576 9,133 132,544 188,645 2-20/L-15 2204800 0 220100 2 30 2,928 284 433 66 1,269 13,000 1,992 38,063 2-26/N-14 2181500 0 220100 8 0 0 0 0 0 0 0 0 0 2-28/P-19 2184700 0 220100 1 30 3,528 717 1,800 7,550 6,349 53,989 226,493 190,484 2-36/0-14 2201400 0 220100 1 25 13,145 1,510 1,622 5,082 21,325 40,559 127,053 533,130 2-40/S-22 2252700 0 220100 1 5 10,933 798 635 68 6,938 3,173 342 34,691 2-42/P-13 2189200 0 220100 8 0 0 0 0 0 0 0 0 0 2-46B/S-13 2192102 0 220100 1 2 807 270 68 293 55 135 585 109 2-48/0-13 2261200 0 220100 1 27 10,234 2,392 2,569 2,208 26,293 69,369 59,626 709,922 2-50/U-08 2236700 0 220100 8 0 0 0 0 0 0 0 0 0 2-52/S-14 2175000 0 220100 1 2 19,345 2,482 741 582 14,325 1,481 1,163 28,650 2-58/S-09 2204100 0 220100 2 2 9,468 308 362 359 3,428 724 718 6,855 2-60/U-13 2237500 0 220100 2 29 1,153 280 352 2,475 405 10,194 71,776 11,755 Form 1 0-405 State of Alaska Run Date: 10/03/97 Alaska Oil and Gas Conservation Commission Run Time: 15:12:42 Monthly Production Report 20 AAC 25.230 Page 2 BP Exploration (Alaska) Inc. Endicott Operating Area September, 1997 Daily Average Production Total Monthly Production Well API C Field M Days Gas-Oil Tubing Oil Water Gas Oil Water Gas Name Number L & Pool T In Ratio PSIG BBL BBL MCF BBL BBL MCF 50- S Code H Oper. 2-62/0-17 2164800 0 220100 8 0 0 0 0 0 0 0 0 0 2-68/S-17 2185800 0 220100 8 0 0 0 0 0 0 0 0 0 3-01/N-29 2167800 0 220100 8 0 0 0 0 0 0 0 0 0 3-03/J-33 2230600 0 220100 1 1 0 661 0 0 7,005 0 0 7,005 3-05/0-29 2162400 0 220100 2 30 863 363 568 1,522 490 17 ,032 45,665 14,696 3-09/L-28A 2178001 0 220100 1 30 1,417 422 3,152 8,402 4,467 94,551 252,060 134,016 3-11/M-30 2184800 0 220100 2 30 1,218 339 1,088 4,787 1,325 32,629 143,603 39,757 3-15/K -33 2175100 0 220100 1 30 2,842 659 1,089 7,290 3,094 32,657 218,694 92,813 3-17B/M-31 2194602 0 220100 1 29 1,869 314 271 969 507 7,868 28,112 14,702 3-19/R-28 2246300 0 220100 8 0 0 0 0 0 0 0 0 0 3-21/L-34 2171400 0 220100 2 28 1,113 326 420 7,004 467 11,747 196,098 13,073 3-23/N-32 2164500 0 220100 8 0 0 0 0 0 0 0 0 0 3-25/M-27 2212500 0 220100 2 30 14,577 759 1,374 3,073 20,036 41,234 92,204 601,077 3-27/M-33 2158600 0 220100 2 30 876 326 2,009 3,366 1,760 60,270 100,969 52,795 3-29/J-32 2210600 0 220100 1 28 804 321 1,952 1,227 1,569 54,642 34,361 43,931 3-33/K-37 2166800 0 220100 8 0 0 0 0 0 0 0 0 0 3-35/L -36 2170100 0 220100 8 0 0 0 0 0 0 0 0 0 3-37/L-35 2255400 0 220100 1 19 780 311 587 3,055 458 11,157 58,052 8,703 3-39A/1-37 2176401 0 220100 1 30 825 472 4,769 1,833 3,933 143,060 54,987 118,003 3-43/P-36 2241600 0 220100 8 0 0 0 0 0 0 0 0 0 3-49A1M-40 2173502 0 220100 2 29 785 299 767 1,421 602 22,238 41,198 17,461 4-02/0-28 2178900 0 220100 1 18 18,753 1,470 1,059 2,338 19,852 19,055 42,091 357,330 4-06A10-30 2172301 0 220100 2 30 6,150 434 481 4,466 2,958 14,429 133,967 88,741 4-10/M-28 2246400 0 220100 1 30 14,372 2,365 2,158 43 31,019 64,746 1,299 930,556 4-18/S-30 2189600 0 220100 8 0 0 0 0 0 0 0 0 0 4-20/M-35 2164001 0 220100 2 6 918 737 226 1,706 208 1,356 10,234 1,245 4-26/0-34 2183500 0 220100 8 0 0 0 0 0 0 0 0 0 4-28/N-37 2187000 0 220100 2 29 733 443 235 3,456 172 6,803 100,218 4,986 4-32/K-38 2255900 0 220100 8 0 0 0 0 0 0 0 0 0 4-34/0-38 2270500 0 220100 8 0 0 0 0 0 0 0 0 0 4-38/K-34 2248200 0 220100 1 30 6,541 854 3,161 179 20,678 94,840 5,374 620,344 4-42/P-38 2173100 0 220100 8 0 0 0 0 0 0 0 0 0 4-46/N-39 2195700 0 220100 2 30 3,701 384 764 2,074 2,826 22,905 62,212 84,768 4-50/K-41 2194000 0 220100 2 21 813 317 11 950 9 230 19,952 187 220100 Endicott Pool Production Totals.......................... 1,747,608 4,480,851 9,155,382 Form 10-405 State of Alaska Run Date: 10/03/97 Alaska Oil and Gas Conservation Commission Run Time: 15: 13:35 Monthly Injection Report 20 AAC 25.432 Page 1 BP Exploration (Alaska) Inc. Endicott Operating Area Endicott September, 1997 Tubing Pressure Casing Pressure Daily Average Injection Total Monthly Injection Well API C Field Days Max Average Max Average Liquid Gas Liquid Gas Name Number L & Pool In PSIG PSIG PSIG PSIG BBL MCF BBL MCF 50- S Code Oper. 2-02/P-18 0292156800 D 220036 3 720.00 546.33 0.00 0.00 368 0 1,106 0 220036 Pool Injection Totals...................... 1,106 0 1-05/0-20 0292160500 G 220100 30 4,498.00 4,281.93 0.00 0.00 0 59,730 0 1,791,926 1-15/P-25 0292236100 G 220100 30 4,498.00 4,281.93 0.00 0.00 0 44,915 0 1,347,456 1-23/0-15 0292251000 W 220100 30 2,263.00 2,150.17 0.00 0.00 20,412 0 612,364 0 1-37/P-24 0292174800 W 220100 30 2,280.00 2,169.37 0.00 0.00 8,165 0 244,970 0 1-41/0-23 0292171300 W 220100 30 2,086.00 1,993.37 0.00 0.00 15,219 0 456,577 0 1-43/P-26 0292186400 W 220100 28 2,175.00 1,753.61 0.00 0.00 20,457 0 572,802 0 1-51N-20 0292230400 W 220100 30 2,292.00 2,174.37 0.00 0.00 2,948 0 88,442 0 1-69N-19 0292202000 W 220100 30 2,272.00 2,153.80 0.00 0.00 3,220 0 96,629 0 2-06/J-22 0292169900 G 220100 30 4,498.00 4,281.93 0.00 0.00 0 103,632 0 3,108,980 2-12/0-16 0292230200 G 220100 30 4,498.00 4,281.93 0.00 0.00 0 19,969 0 599,088 2-16/M-16 0292188500 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 2-22/L-14 0292193100 W 220100 30 2,161.00 2,066.93 0.00 0.00 14,051 0 421,540 0 2-24/M-12 0292241800 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 2-30/0-09 0292222800 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 2-34/P-14 0292166200 W 220100 30 2,197.00 2,093.23 0.00 0.00 19,156 0 574,689 0 2-44/R-12 0292176700 W 220100 22 2,294.00 2,189.18 0.00 0.00 331 0 7,293 0 2-54/0-12 0292221800 W 220100 30 2,185.00 2,082.77 0.00 0.00 20,717 0 621,520 0 2-64/U-10 0292205500 W 220100 30 2,297.00 2,179.30 0.00 0.00 1,599 0 47,970 0 2-70/U-15 0292189900 W 220100 30 2,313.00 2,195.03 0.00 0.00 2,275 0 68,266 0 3-07/N-28 0292191100 W 220100 30 2,093.00 2,002.67 0.00 0.00 15,003 0 450,096 0 3-41/K-39 0292187800 W 220100 30 2,099.00 2,010.27 0.00 0.00 25,339 0 760,176 0 3-45/M-39 0292181100 W 220100 30 2,225.00 2,119.63 0.00 0.00 3,878 0 116,349 0 3-47/0-35 0292156900 W 220100 30 2,173.00 2,069.97 0.00 0.00 8,209 0 246,289 0 4-04fT-26 0292196800 W 220100 30 2,179.00 2,081.63 0.00 0.00 5,985 0 179,579 0 4-08/P-27 0292169200 W 220100 30 1,713.00 1,660.03 0.00 0.00 9,730 0 291,918 0 4-14/R-34 0292186300 W 220100 30 1,971.00 1,903.03 0.00 0.00 9,041 0 271 ,241 0 4-40/P-43 0292226500 W 220100 30 2,243.00 2,141.17 0.00 0.00 2,845 0 85,377 0 4-44/M-44 0292225400 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 4-48/K-43 0292197200 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 5-01/SD-07 0292051800 G 220100 30 4,498.00 4,281.93 0.00 0.00 0 41 ,795 0 1,253,862 5-02/SD-10 0292064000 W 220100 30 2,054.00 1,940.87 0.00 0.00 13,142 0 394,283 0 220100 Pool Injection Totals...................... 6,608,370 8,101,312 Form 10-406 Run Date: 10/03/97 Run Time: 15: 13:35 BP Exploration (Alaska) Inc. API C Field Days Number L & Pool In 50- S Code Oper. END Gathering Center Totals.......................................... Well Name State of Alaska Alaska Oil and Gas Conservation Commission Monthly Injection Report 20 AAC 25.432 Endicott Operating Area Endicott Tubing Pressure Casing Pressure Max Average Max Average PSIG PSIG PSIG PSIG Field Injection Total.............. ............. ............... ............. ............. ............ Form 10-406 Daily Average Injection Liquid Gas BBL MCF Page 2 September, 1997 Total Monthly Injection Liquid Gas BBL MCF 6,609,476 8,101,312 6,609,476 8,101,312 Run Date: Run Time: PA OA 1 0/03/97 15:29:41 SDN END BP Exploration (Alaska) Inc. Oil Movement Accounting & Reporting Alaska Oil and Gas Conservation Commission Oil Reconciliation Report From Date: To Date: 9/1/97 9/30/97 Description Pipeline Deliveries, END Oil Volume 1,887,726 TOTAL PIPELINE DELIVERIES 1,887,726 NGL Deliveries, END -122,634 TOTAL NGL DELIVERIES -122,634 Allocation of SLP to EPA -1,747,659 Load Diesel, SDN o Upstream Losses, SON o Downstream Losses, SON o TOTAL FIELD PRODUCTION 17,433 I hereby certify that the foregoing is true and correct to the best of my knowledge. f 0JIi () '!f Signed: Title: 1H€:l. lht ( ¡<.a d ~ Date: Page 1 1r!6)¡7 Report # SUMDUb - 05 . STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 MC 25.230 BP EXPLORATION (ALASKA), INC. Name of Operator SAG DELTA NORTH PRODUCTION FACILITY GAS LIQUIDS Sep 1997 Field and Pool Month and Year of Production 1. WELL NO. 2. API NUMBER C 50- L S 4. FIELD 6. DAYS 7. GAS-OIL 8. TUBING DAILY AVERAGE PRODUCTION & POOL METf- IN RATIO PSIG 9. OIL 110. WATERlll. GAS CODE OPER (BPD) (BPD) (MCF) 029-0000006 P 220150 7 30 N/A N/A 4.9 o o I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Iotd /'f 15. Title: Manager, Volume, Rovaltv & Severance Date: Øßff7 TOTAL FORM 10-405 REV 12-1-85 TOTAL MONTHLY PRODUCTION 12. OIL 113. WATER 114. GAS (BBL) (BBL) (MCF) 147 o o 147 o o SUBMIT IN DUPLICATE Run Date: 10/03/97 Run Time: 15: 12:42 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Production Report BP Exploration (Alaska) Inc. Well API C Field M Days Gas-Oil Name Number L & Pool T In Ratio 50- S Code H Oper. 2-32/SN-03 2208400 0 220150 2 30 625 2-38/SN-01 2209000 0 220150 2 30 626 220150 Sag Delta North Pool Production Totals.......................... Form 10-405 20 MC 25.230 Endicott Operating Area Daily Average Production Oil Water Gas BBL BBL MCF Tubing PSIG 289 289 251 330 927 4,477 157 206 Page 3 September, 1997 Total Monthly Production Oil Water Gas BBL BBL MCF 7,539 9,894 27,803 134,307 162,110 10,908 4,715 6,193 17,433 Run Date: 10/03/97 Run Time: 15:25:30 BP Exploration (Alaska) Inc. API C Field Number L & Pool 50- S Code 1-11/SN-04 0292210700 W 220150 5-03/SD-09 0292063900 W 220150 220150 Pool Injection Totals...................... Well Name END Gathering Center Totals.......................................... Days In Oper. 30 30 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Injection Report 20 AAC 25.432 Endicott Operating Area Sag Delta North Unit Tubing Pressure Casing Pressure Daily Average Injection Max Average Max Average Liquid Gas PSIG PSIG PSIG PSIG BBL MCF 2,139.00 1,795.00 2,064.13 1,747.70 0.00 0.00 0.00 0.00 5,386 4,552 Field Injection Total...... ............. .......... ................ ...................... ............. Form 10-406 :.:. , Page 1 September, 1997 Total Monthly Injection Liquid Gas BBL MCF o o 161,596 136,564 298,160 o o o 298,160 o 298,160 o Run Date: Run Time: PA OA 11/05/97 14:59:35 EPA END BP Exploration (Alaska) Inc. Oil Movement Accounting & Reporting Alaska Oil and Gas Conservation Commission Oil Reconciliation Report From Date: To Date: 1 0/1/97 10131/97 Description Pipeline Deliveries, END TOTAL PIPELINE DELIVERIES NGL Deliveries, END TOTAL NGL DELIVERIES Allocation of SLP to SON Load Diesel, EPA Upstream Losses, EPA Downstream Losses, EPA TOTAL FIELD PRODUCTION I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed: fl!JL!. tJ. ~ Title: {(1ft. Ih-, 1lfJ/ " ~. Page 1 Oil Volume 1,996,796 1,996,796 -139,354 -139,354 -18,120 o o o 1,839,322 Date: Report # SUMDUD - 05' tI h 47 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 BP EXPLORATION (ALASKA). INC. Name of Operator ENDICOTT PRODUCTION FACILITY GAS LIQUIDS Field and Pool 1. WELL NO. 2. API NUMBER 3. C 4. FIELD 5 6. DAYS 7. GAS-OIL 8. TUBING DAILY AVERAGE PRODUCTION 50- L & POOL MET - IN RATIO PSIG 9. OIL 110. WATER 1l. GAS S CODE OPER (BPD) (BPD) (MCF) 029-0000002 P 220100 7 31 NI A 4490.8 o N/A ~:;:::ce~~~;j ro¡¡;g ¡, I~e and correct 10 fue be$ of my ~o~edge Title: Manager, Volume, Royalty & Severance Date: ttj, #7 TOTAL 139.214 o FORM 10-405 REV 12-1-85 Oct 1997 Month and Year of Production TOTAL MONTHLY PRODUCTION 12. OIL 113. WATER 14. GAS (BBL) (BBL) (MCF) o 139.214 o o 15. o SUBMIT IN DUPLICATE State of Alaska Run Date: 11/05/97 Alaska Oil and Gas Conservation Commission Run Time: 14:57:31 Monthly Production Report 20 MC 25.230 Page 1 BP Exploration (Alaska) Inc. Endicott Operating Area October, 1997 Daily Average Production Total Monthly Production Well API C Field M Days Gas-Oil Tubing Oil Water Gas Oil Water Gas Name Number L & Pool T In Ratio PSIG BBL BBL MCF BBL BBL MCF 50- S Code H Oper. 1-01/J-19 2180100 0 220100 1 29 13,896 1,636 1,668 1,550 23,179 48,374 44,946 672,184 1-03/P-16 2260100 0 220100 1 31 7,272 2,074 1 ,424 3,455 10,355 44,143 107,117 321,008 1-09A1L -21 2174301 0 220100 1 31 2,954 294 1,378 766 4,069 42,710 23,758 126,150 1-17A11-17 2210001 0 220100 2 31 907 348 723 752 655 22,404 23,325 20,312 1-19/1-18 2256900 0 220100 1 3 8,573 309 30 4,233 254 89 12,699 763 1-21/K-25 2200500 0 220100 1 31 7,562 321 853 12 6,454 26,456 370 200,073 1-25A1K-22 2172201 0 220100 1 31 720 273 785 77 566 24,342 2,398 17,537 1-27/P-20 2169300 0 220100 1 31 10,222 1,396 2,394 6,571 24,477 74,226 203,691 758,774 1-29/M-25 2166900 0 220100 1 31 7,487 469 3,036 2,708 22,726 94,103 83,938 704,515 1-31/M-21 2256200 0 220100 1 31 914 447 715 5,571 653 22,151 172,693 20,253 1-33/M-23 2257700 0 220100 1 31 464 306 570 5,781 264 17 ,660 179,213 8,195 1-35/0-25 2167200 0 220100 1 20 12,044 2,029 700 643 8,429 13,997 12,865 168,573 1-39/P-17 2182700 0 220100 2 31 6,540 1,031 685 6,501 4,479 21,231 201,543 138,842 1-45/0-26 2199100 0 220100 8 0 0 0 0 0 0 0 0 0 1-47/0-21 2162500 0 220100 8 0 0 0 0 0 0 0 0 0 1-49/P-21 2184100 0 220100 1 31 1,740 428 557 7,631 969 17,260 236,562 30,041 1-55/R-25 2178800 0 220100 8 0 0 0 0 0 0 0 0 0 1-57/R-23 2187300 0 220100 8 0 0 0 0 0 0 0 0 0 1-61/0-20 2252000 0 220100 1 31 8,067 1,348 1,312 11,191 10,583 40,668 346,930 328,074 1-63IT-22 2190500 0 220100 1 31 13,106 1,671 1,706 2,376 22,363 52,897 73,665 693,249 1-65/N-25 2262700 0 220100 1 31 4,908 1,627 1,342 3,121 6,584 41,588 96,757 204,1 06 1-67 IT -20 2198500 0 220100 1 21 1,594 388 192 11 ,778 306 4,032 247,340 6,428 2-04/M-19 2158500 0 220100 1 31 6,566 414 2,073 6,960 13,609 64,254 215,766 421,882 2-08/K-16 2177100 0 220100 2 31 2,888 382 1,098 6,609 3,171 34,048 204,887 98,315 2-14/0-16 2163900 0 220100 1 31 3,221 382 3,852 11,043 12,408 119,418 342,322 384,634 2-18/L-16 2203200 0 220100 1 18 7,564 345 950 10,716 7,183 17,094 192,884 129,293 2-20/L-15 2204800 0 220100 2 31 3,034 283 355 78 1,078 11,019 2,413 33,432 2-26/N-14 2181500 0 220100 8 0 0 0 0 0 0 0 0 0 2-28/P-19 2184700 0 220100 1 31 5,624 776 1,617 9,892 9,094 50,129 306,647 281,921 2-36/0-14 2201400 0 220100 1 25 16,406 1,413 1,193 5,708 19,579 29,835 142,706 489,472 2-40/S-22 2252700 0 220100 1 4 12,241 284 497 59 6,087 1,989 236 24,347 2-42/P-13 2189200 0 220100 8 0 0 0 0 0 0 0 0 0 2-46B/S-13 2192102 0 220100 1 8 734 247 39 310 29 312 2,481 229 2-48/0-13 2261200 0 220100 1 28 12,229 2,257 1,947 2,431 23,807 54,509 68,074 666,591 2-50/U-08 2236700 0 220100 2 30 3,281 352 706 1 ,432 2,315 21,166 42,974 69,449 2-52/S-14 2175000 0 220100 1 2 13,549 918 718 613 9,729 1 ,436 1,225 19,457 2-58/S-09 2204100 0 220100 2 1 11 ,450 519 111 122 1,271 111 122 1,271 2-60/U-13 2237500 0 220100 2 31 753 280 211 1,357 159 6,543 42,080 4,930 Form 10-405 State of Alaska Run Date: 11/05/97 Alaska Oil and Gas Conservation Commission Run Time: 14:57:31 Monthly Production Report 20 AAC 25.230 Page 2 BP Exploration (Alaska) Inc. Endicott Operating Area October, 1997 Daily Average Production Total Monthly Production Well API C Field M Days Gas-Oil Tubing Oil Water Gas Oil Water Gas Name Number L & Pool T In Ratio PSIG BBL BBL MCF BBL BBL MCF 50- S Code H Oper. 2-62/0-17 2164800 0 220100 8 0 0 0 0 0 0 0 0 0 2-68/S-17 2185800 0 220100 8 0 0 0 0 0 0 0 0 0 3-01/N-29 2167800 0 220100 8 0 0 0 0 0 0 0 0 0 3-03/J-33 2230600 0 220100 1 14 18,293 1,436 318 36 5,819 4,453 507 81 ,460 3-05/0-29 2162400 0 220100 2 31 887 348 576 1,777 511 17,865 55,076 15,851 3-09/L-28A 2178001 0 220100 1 31 1,293 425 2,764 8,812 3,573 85,673 273,185 110,765 3-11/M-30 2184800 0 220100 2 31 1,338 352 1,131 5,423 1,513 35,053 168,126 46,917 3-15/K-33 2175100 0 220100 1 31 5,329 804 1,529 9,112 8,150 47,412 282,461 252,653 3-17B/M-31 2194602 0 220100 1 27 757 355 151 237 114 4,074 6,390 3,083 3-19/R-28 2246300 0 220100 8 0 0 0 0 0 0 0 0 0 3-21/L-34 2171400 0 220100 2 31 887 450 479 6,638 425 14,855 205,777 13,180 3-23/N-32 2164500 0 220100 8 0 0 0 0 0 0 0 0 0 3-25/M-27 2212500 0 220100 2 31 13,446 766 1 ,455 2,894 19,563 45,103 89,714 606,443 3-27/M-33 2158600 0 220100 2 31 888 332 1,471 2,947 1,306 45,603 91,348 40,500 3-29/J-32 2210600 0 220100 1 31 767 331 1,518 1 ,449 1,165 47,056 44,911 36,101 3-33/K-37 2166800 0 220100 8 0 0 0 0 0 0 0 0 0 3-35/L -36 2170100 0 220100 8 0 0 0 0 0 0 0 0 0 3-37/L-35 2255400 0 220100 1 11 801 340 454 2,759 364 4,995 30,354 4,000 3-39A/1-37 2176401 0 220100 1 31 1,284 371 3,255 3,045 4,178 100,891 94,395 129,531 3-43/P-36 2241600 0 220100 8 0 0 0 0 0 0 0 0 0 3-49A/M-40 2173502 0 220100 2 31 769 313 347 679 267 10,769 21,034 8,278 4-02/0-28 2178900 0 220100 1 31 21,100 1,504 815 1,810 17,205 25,277 56,109 533,354 4-06A/O-30 2172301 0 220100 2 31 6,449 445 747 4,725 4,819 23,167 146,470 149,400 4-1 0/M-28 2246400 0 220100 1 31 9,502 2,408 2,794 92 26,550 86,623 2,864 823,055 4-18/S-30 2189600 0 220100 8 0 0 0 0 0 0 0 0 0 4-20/M-35 2164001 0 220100 8 0 0 0 0 0 0 0 0 0 4-26/0-34 2183500 0 220100 8 0 0 0 0 0 0 0 0 0 4-28/N-37 2187000 0 220100 2 30 806 435 157 4,172 127 4,721 125,158 3,803 4-32/K-38 2255900 0 220100 1 5 787 359 186 1,650 146 928 8,250 730 4-34/0-38 2270500 0 220100 1 8 812 945 19 3,932 16 154 31 ,456 125 4-38/K-34 2248200 0 220100 1 31 4,173 1,324 6,207 23 25,901 192,423 712 802,932 4-42/P-38 2173100 0 220100 2 12 1,984 310 68 1,390 134 813 16,675 1,613 4-46/N-39 2195700 0 220100 2 30 4,163 391 707 1,991 2,943 21,210 59,726 88,290 4-50/K-41 2194000 0 220100 2 2 700 1,137 5 1,011 4 10 2,021 7 220100 Endicott Pool Production Totals.......................... 1,839,322 5,447,346 10,796,371 Form 10-405 State of Alaska Run Date: 11/05/97 Alaska Oil and Gas Conservation Commission Run Time: 14:58:17 Monthly Injection Report 20 AAC 25.432 Page 1 BP Exploration (Alaska) Inc. Endicott Operating Area Endicott October, 1997 Tubing Pressure Casing Pressure Daily Average Injection Total Monthly Injection Well API C Field Days Max Average Max Average Liquid Gas Liquid Gas Name Number L & Pool In PSIG PSIG PSIG PSIG BBL MCF BBL MCF 50- S Code Oper. 2-02/P-18 0292156800 0 220036 5 1,218.00 679.20 0.00 0.00 153 0 769 0 220036 Pool Injection Totals...................... 769 0 1-05/0-20 0292160500 G 220100 31 4,483.00 4,283.19 0.00 0.00 0 71,859 0 2,227,637 1-15/P-25 0292236100 G 220100 31 4,483.00 4,283.19 0.00 0.00 0 45,966 0 1 ,424,960 1-23/0-15 0292251000 W 220100 31 2,407.00 2,216.10 0.00 0.00 22,542 0 698,829 0 1-37/P-24 0292174800 W 220100 30 2,412.00 2,233.63 0.00 0.00 9,675 0 290,251 0 1-41/0-23 0292171300 W 220100 31 2,209.00 2,051.58 0.00 0.00 16,941 0 525,186 0 1-43/P-26 0292186400 W 220100 31 2,340.00 2,161.32 0.00 0.00 31,685 0 982,244 0 1-51N-20 0292230400 W 220100 31 2,439.00 2,242.90 0.00 0.00 3,185 0 98,747 0 1-69N-19 0292202000 W 220100 31 2,401.00 2,214.48 0.00 0.00 3,687 0 114,298 0 2-06/J-22 0292169900 G 220100 31 4,483.00 4,283.19 0.00 0.00 0 107,550 0 3,334,079 2-12/0-16 0292230200 G 220100 31 4,483.00 4,283.19 0.00 0.00 0 23,302 0 722,379 2-16/M-16 0292188500 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 2-22/L-14 0292193100 W 220100 31 2,289.00 2,126.87 0.00 0.00 15,648 0 485,093 0 2-24/M-12 0292241800 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 2-30/0-09 0292222800 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 2-34/P-14 0292166200 W 220100 31 2,334.00 2,150.16 0.00 0.00 20,600 0 638,613 0 2-44/R-12 0292176700 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 2-54/0-12 0292221800 W 220100 31 2,318.00 2,144.23 0.00 0.00 22,683 0 703,180 0 2-64/U-10 0292205500 W 220100 31 2,446.00 2,248.19 0.00 0.00 1,564 0 48,504 0 2-70/U-15 0292189900 W 220100 31 2,463.00 2,264.16 0.00 0.00 3,106 0 96,299 0 3-07/N-28 0292191100 W 220100 31 2,225.00 2,052.13 0.00 0.00 17,215 0 533,677 0 3-41/K-39 0292187800 W 220100 31 2,229.00 2,066.71 0.00 0.00 27,380 0 848,804 0 3-45/M-39 0292181100 W 220100 31 2,343.00 2,166.58 0.00 0.00 8,361 0 259,212 0 3-47/0-35 0292156900 W 220100 31 2,303.00 2,128.81 0.00 0.00 9,204 0 285,343 0 4-04ff -26 0292196800 W 220100 31 2,306.00 2,135.65 0.00 0.00 7,038 0 218,189 0 4-08/P-27 0292169200 W 220100 31 1,792.00 1,711.26 0.00 0.00 10,251 0 317,800 0 4-14/R-34 0292186300 W 220100 31 2,050.00 1 ,936.48 0.00 0.00 10,297 0 319,212 0 4-40/P-43 0292226500 W 220100 31 2,378.00 2,199.45 0.00 0.00 3,568 0 110,632 0 4-44/M-44 0292225400 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 4-48/K-43 0292197200 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 5-01/SD-07 0292051800 G 220100 31 4,483.00 4,283.19 0.00 0.00 0 61,767 0 1,914,791 5-02/SD-10 0292064000 W 220100 31 1,894.00 1,497.97 0.00 0.00 8,516 0 263,996 0 220100 Pool Injection Totals...................... 7,838,109 9,623,846 Form 10-406 Run Date: 11/05/97 Run Time: 14:58: 17 BP Exploration (Alaska) Inc. API C Field Days Number L & Pool In 50- S Code Oper. END Gathering Center Totals.......................................... Well Name State of Alaska Alaska Oil and Gas Conservation Commission Monthly Injection Report 20 AAC 25.432 Endicott Operating Area Endicott Tubing Pressure Casing Pressure Max Average Max Average PSIG PSIG PSIG PSIG Field Injection Total........ .............................. ........... ................. ........ ...... Form 10-406 Daily Average Injection Liquid Gas BBL MCF Page 2 October, 1997 Total Monthly Injection Liquid Gas BBL MCF 7,838,878 9,623,846 7,838,878 9,623,846 Run Date: Run Time: PA OA Signed: 11/05/97 15:00:28 SDN END BP Exploration (Alaska) Inc. Oil Movement Accounting & Reporting Alaska Oil and Gas Conservation Commission Oil Reconciliation Report From Date: To Date: 10/1/97 10/31/97 I hereby certify that the foregoing is true and correct to the best of my knowledge. t f1II1 f} !J¡¡ Description Pipeline Deliveries, END TOTAL PIPELINE DELIVERIES NGL Deliveries, END TOTAL NGL DELIVERIES Allocation of SLP to EPA Load Diesel, SON Upstream Losses, SON Downstream Losses, SON TOTAL FIELD PRODUCTION Title: IHht. II}{, ¡tOý' SeI; Page 1 Oil Volume 1,996,796 1,996,796 -139,354 -139,354 -1,839,322 o o o 18,120 Date: (( h /1/7 Report # SUMDUb - 05 ~ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 MC 25.230 BP EXPLORATION (ALASKA), INC. Name of Operator SAG DELTA NORTH PRODUCTION FACILITY GAS LIQUIDS Oct 1997 Field and Pool Month and Year of Production 1. WELL NO. 2. API NUMBER C 50- L S 4. FIELD 6. DAYS 7. GAS-OIL 8. TUBING DAILY AVERAGE PRODUCTION & POOL METf- IN RATIO PSIG 9. OIL 110. WATERlll. GAS CODE OPER (BPD) (BPD) (MCF) 029-0000006 P 220150 7 31 N/A N/A 4.5 o o I hereby certify that the foregoing is true and correct to the best of my knowledge Signed %11/ IJ. ~ Title: Manager, Volume, Royalty & Severance Date: Iff /97 FORM 10-405 REV 12-1-85 15. TOTAL TOTAL MONTHLY PRODUCTION 12. OIL 113. WATER 114. GAS (BBL) (BBL) (MCF) 140 o o 140 o o SUBMIT IN DUPLICATE Run Date: 11/05/97 Run Time: 14:57:31 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Production Report BP Exploration (Alaska) Inc. Well API C Field M Days Gas-Oil Name Number L & Pool T In Ratio 50- S Code H Oper. 2-32/SN-03 2208400 0 220150 2 31 626 2-38/SN-01 2209000 0 220150 2 31 626 220150 Sag Delta North Pool Production Totals.......................... Form 10-405 20 AAC 25.230 Endicott Operating Area Daily Average Production Oil Water Gas BBL BBL MCF Tubing PSIG 289 286 274 310 856 4,747 172 194 Page 3 October, 1997 Total Monthly Production Oil Water Gas BBL BBL MCF 8,498 9,622 18,120 26,543 147,154 173,697 5,317 6,023 11 ,340 Run Date: 11/05/97 Run Time: 14:59:55 BP Exploration (Alaska) Inc. API C Field Number L & Pool 50- S Code 1-11/SN-04 0292210700 W 220150 5-03/SD-09 0292063900 W 220150 220150 Pool Injection Totals...................... Well Name END Gathering Center Totals.......................................... Days In Oper. 31 31 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Injection Report 20 AAC 25.432 Endicott Operating Area Sag Delta North Unit Tubing Pressure Casing Pressure Daily Average Injection Max Average Max Average Liquid Gas PSIG PSIG PSIG PSIG BBL MCF 2,271.00 1,888.00 2,114.32 1,794.19 0.00 0.00 0.00 0.00 6,205 5,198 Field Injection Total........................ ....................... ................................. Form 10-406 Page 1 October, 1997 Total Monthly Injection Liquid Gas BBL MCF o o 192,381 161,146 353,527 o o o 353,527 o 353,527 o Run Date: Run Time: PA OA 12/03/97 11 :21 :28 EPA END BP Exploration (Alaska) Inc. Oil Movement Accounting & Reporting Alaska Oil and Gas Conservation Commission Oil Reconciliation Report From Date: To Date: 11/1197 11/30/97 Description Pipeline Deliveries, END Oil Volume 1,819,026 TOTAL PIPELINE DELIVERIES NGL Deliveries, END TOTAL NGL DELIVERIES Allocation of SLP to SON Load Diesel, EPA Upstream Losses, EPA Downstream Losses, EPA TOTAL FIELD PRODUCTION I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed: f rø1 O. ií¡ Title: ff1hL v'ot-, ~or.i Sew. Page 1 1,819,026 -125,510 -125,510 -20,270 -73 o o 1,673,173 Date: ¡-¿/a/'7 - Report # SUMDUD - 05 )::0> ~ ~ Q "'" >ø ~~ ...0 ;..1;::¡ ;0(1) CP" g § ( g C1 C,', (] <......~;.. ,C) -.L ø <J.J ......,¡ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 MC 25.230 BP EXPLORATION (ALASKA), INC. Name of Operator ENDlcon PRODUCTION FACILITY GAS LIQUIDS Field and Pool 1. WELL NO. 2. API NUMBER 3. C 4. FIELD 5 6. DAYS 7. GAS-OIL 8. TUBING DAILY AVERAGE PRODUCTION 50- L & POOL MET!- IN RATIO PSIG 9. OIL 110. WATERI'" GAS S CODE OPER (BPD) (BPD) (MCF) 029-0000002 P 220100 7 29 N/A N/ A 4322.7 o o ::a m n rTt < 8 ~:~:::~ert;~ Ÿ ;¡'~'n"i¡ and cwect to ~ be. of my ~o~edge 15. Title: Manager, Volume, Royalty & Severance Date: 1'1.ð.17 TOTAL 125,359 o FORM 10-405 REV 12-1-85 Nov 1997 Month and Year of Production TOTAL MONTHLY PRODUCTION 12. OIL 113. WATER 14. GAS (BBL) (BBL) (MCF) 125,359 o o o SUBMIT IN DUPLICATE State of Alaska Run Date: 12/03/97 Alaska Oil and Gas Conservation Commission Run Time: 11: 19:02 Monthly Production Report 20 AAC 25.230 Page 1 BP Exploration (Alaska) Inc. Endicott Operating Area November, 1997 Daily Average Production Total Monthly Production Well API C Field M Days Gas-Oil Tubing Oil Water Gas Oil Water Gas Name Number L & Pool T In Ratio PSIG BBL BBL MCF BBL BBL MCF 50- S Code H Oper. 1-01/J-19 2180100 0 220100 1 19 8,316 1,626 1,565 984 13,014 29,735 18,696 247,266 1-03/P-16 2260100 0 220100 1 30 8,413 2,085 1,306 3,782 10,989 39,182 113,468 329,656 1-09A1L-21 2174301 0 220100 1 30 4,450 294 1,146 739 5,097 34,365 22,172 152,908 1-17 A11-17 2210001 0 220100 2 28 964 360 529 965 510 14,812 27,024 14,284 1-19/1-18 2256900 0 220100 8 0 0 0 0 0 0 0 0 0 1-21/K-25 2200500 0 220100 1 28 8,847 427 734 30 6,491 20,545 847 181,760 1-25A1K-22 2172201 0 220100 1 30 668 271 741 52 495 22,229 1,566 14,845 1-27/P-20 2169300 0 220100 1 30 9,693 1,479 2,198 5,961 21,304 65,935 178,843 639,130 1-29/M-25 2166900 0 220100 1 30 7,539 478 3,129 2,592 23,587 93,866 77,772 707,624 1-31/M-21 2256200 0 220100 1 30 1,021 438 773 5,952 789 23,176 178,558 23,667 1-33/M-23 2257700 0 220100 1 30 518 308 543 5,744 281 16,299 172,307 8,439 1-35/0-25 2167200 0 220100 1 13 7,309 1,868 795 748 5,807 10,330 9,727 75,497 1-39/P-17 2182700 0 220100 2 30 9,126 935 454 6,873 4,142 13,616 206,196 124,254 1-45/Q-26 2199100 0 220100 8 0 0 0 0 0 0 0 0 0 1-47 AlM-20 2162501 0 220100 8 0 0 0 0 0 0 0 0 0 1-49/P-21 2184100 0 220100 1 14 2,203 393 331 7,208 728 4,627 100,918 10,191 1-55/R-25 2178800 0 220100 8 0 0 0 0 0 0 0 0 0 1-57/R-23 2187300 0 220100 8 0 0 0 0 0 0 0 0 0 1-61/Q-20 2252000 0 220100 1 30 7,527 1,338 864 7,454 6,502 25,913 223,606 195,049 1-63fT -22 2190500 0 220100 1 22 14,231 2,035 950 1,194 13,523 20,905 26,257 297,505 1-65/N-25 2262700 0 220100 1 30 2,195 1,325 1,271 3,776 2,790 38,132 113,271 83,687 1-67 fT -20 2198500 0 220100 1 11 17,078 482 558 10,473 9,524 6,134 115,199 104,759 2-04/M-19 2158500 0 220100 1 30 6,003 426 2,380 6,790 14,290 71,410 203,706 428,700 2-08/K-16 2177100 0 220100 2 30 2,344 406 1 ,422 6,776 3,331 42,645 203,279 99,940 2-14/0-16 2163900 0 220100 1 30 3,446 376 3,595 10,385 12,390 107,861 311,541 371,714 2-18/L-16 2203200 0 220100 1 30 9,231 378 1,163 10,297 10,737 34,897 308,920 322,120 2-20/L -15 2204800 0 220100 2 30 2,691 280 390 53 1,050 11,710 1,602 31,509 2-26/N-14 2181500 0 220100 8 0 0 0 0 0 0 0 0 0 2-28/P-19 2184700 0 220100 1 30 5,679 760 1 ,435 9,335 8,152 43,062 280,036 244,558 2-36/0-14 2201400 0 220100 1 26 13,380 1,521 1,652 5,534 22,098 42,941 143,893 574,549 2-40/S-22 2252700 0 220100 1 2 20,494 305 77 8 1,578 154 16 3,156 2-42/P-13 2189200 0 220100 8 0 0 0 0 0 0 0 0 0 2-44A1Q-11 2176701 0 220100 8 0 0 0 0 0 0 0 0 0 2-46B/S-13 2192102 0 220100 1 9 721 264 12 122 8 104 1,102 75 2-48/0-13 2261200 0 220100 1 30 11,951 2,385 1,842 2,452 22,008 55,246 73,549 660,242 2-50/U-08 2236700 0 220100 2 30 4,013 351 684 1,139 2,745 20,521 34,182 82,351 2-52/S-14 2175000 0 220100 1 13 14,514 718 878 971 12,743 11,414 12,622 165,664 2-58/S-09 2204100 0 220100 2 9 10,878 471 435 458 4,734 3,917 4,124 42,609 Form 10-405 State of Alaska Run Date: 12/03/97 Alaska Oil and Gas Conservation Commission Run Time: 11: 19:02 Monthly Production Report 20 AAC 25.230 Page 2 BP Exploration (Alaska) Inc. Endicott Operating Area November, 1997 Daily Average Production Total Monthly Production Well API C Field M Days Gas-Oil Tubing Oil Water Gas Oil Water Gas Name Number L & Pool T In Ratio PSIG BBL BBL MCF BBL BBL MCF 50- S Code H Oper. 2-60/U-13 2237500 0 220100 2 30 736 343 241 1,208 177 7,223 36,244 5,316 2-62/0-17 2164800 0 220100 8 0 0 0 0 0 0 0 0 0 2-68/S-17 2185800 0 220100 8 0 0 0 0 0 0 0 0 0 3-01/N-29 2167800 0 220100 8 0 0 0 0 0 0 0 0 0 3-03/J-33 2230600 0 220100 1 13 20,382 1,450 321 13 6,547 4,176 171 85,117 3-05/0-29 2162400 0 220100 2 30 971 347 459 1,803 446 13,768 54,095 13,373 3-09/L-28A 2178001 0 220100 1 30 1,241 433 2,882 9,684 3,575 86,461 290,534 107,259 3-11/M-30 2184800 0 220100 2 30 1 ,493 365 1,019 6,099 1,521 30,557 182,979 45,617 3-15/K-33 2175100 0 220100 1 30 5,143 958 2,129 12,694 10,948 63,867 380,814 328,452 3-17B/M-31 2194602 0 220100 1 30 737 321 137 392 101 4,106 11 ,767 3,027 3-19/R-28 2246300 0 220100 8 0 0 0 0 0 0 0 0 0 3-21/L-34 2171400 0 220100 2 18 913 362 579 8,954 528 10,418 161,174 9,509 3-23/N-32 2164500 0 220100 8 0 0 0 0 0 0 0 0 0 3-25/M-27 2212500 0 220100 2 30 19,404 793 1,046 2,906 20,298 31,381 87,194 608,927 3-27/M-33 2158600 0 220100 2 30 936 345 1,237 2,770 1,159 37,124 83,095 34,761 3-29/J-32 2210600 0 220100 1 30 724 340 1,572 1,853 1,139 47,163 55,579 34,160 3-33/K-37 2166800 0 220100 8 0 0 0 0 0 0 0 0 0 3-35/L -36 2170100 0 220100 8 0 0 0 0 0 0 0 0 0 3-37/L-35 2255400 0 220100 1 15 774 362 820 3,444 635 12,300 51,662 9,520 3-39A/1-37 2176401 0 220100 1 30 1,552 377 1,819 5,191 2,824 54,577 155,723 84,718 3-43/P-36 2241600 0 220100 8 0 0 0 0 0 0 0 0 0 3-49A1M-40 2173502 0 220100 2 30 754 331 316 752 238 9,480 22,547 7,152 4-02/0-28 2178900 0 220100 1 30 21,972 883 1,180 2,575 25,929 35,403 77,261 777,866 4-06A10-30 2172301 0 220100 2 30 4,759 437 537 4,680 2,555 16,106 140,385 76,651 4-1 0/M-28 2246400 0 220100 1 30 10,780 2,456 2,790 73 30,073 83,694 2,190 902,184 4-18/S-30 2189600 0 220100 8 0 0 0 0 0 0 0 0 0 4-20/M-35 2164001 0 220100 2 8 936 292 309 2,456 289 2,472 19,646 2,314 4-26/0-34 2183500 0 220100 8 0 0 0 0 0 0 0 0 0 4-28/N-37 2187000 0 220100 2 9 917 377 98 3,076 89 878 27,681 805 4-32/K-38 2255900 0 220100 1 30 754 323 318 2,565 240 9,550 76,957 7,203 4-34/0-38 2270500 0 220100 1 3 857 916 2 457 2 7 1,371 6 4-38/K-34 2248200 0 220100 1 30 5,562 1,392 5,633 496 31,331 168,992 14,878 939,940 4-42/P-38 2173100 0 220100 2 7 726 405 38 544 28 266 3,806 193 4-46/N-39 2195700 0 220100 2 30 5,332 397 583 1,999 3,109 17,491 59,968 93,256 4-50/K-41 2194000 0 220100 2 6 767 377 5 971 4 30 5,824 23 220100 Endicott Pool Production Totals.......................... 1,673,173 5,168,544 10,415,057 Form 10-405 State of Alaska Run Date: 12/03/97 Alaska Oil and Gas Conservation Commission Run Time: 11 :20: 1 0 Monthly Injection Report 20 AAC 25.432 Page 1 BP Exploration (Alaska) Inc. Endicott Operating Area Endicott November, 1997 Tubing Pressure Casing Pressure Daily Average Injection Total Monthly Injection Well API C Field Days Max Average Max Average Liquid Gas Liquid Gas Name Number L & Pool In PSIG PSIG PSIG PSIG BBL MCF BBL MCF 50- S Code Oper. 2-02/P-18 0292156800 0 220036 3 412.00 279.00 0.00 0.00 262 0 786 0 220036 Pool Injection Totals...................... 786 0 1-05/0-20 0292160500 G 220100 30 4,624.00 4,302.60 0.00 0.00 0 66,336 0 1,990,083 1-15/P-25 0292236100 G 220100 30 4,624.00 4,302.60 0.00 0.00 0 45,099 0 1,352,982 1-23/0-15 0292251000 W 220100 30 2,417.00 2,348.83 0.00 0.00 22,753 0 682,619 0 1-37/P-24 0292174800 W 220100 30 2,415.00 2,353.43 0.00 0.00 10,519 0 315,572 0 1-41/0-23 0292171300 W 220100 30 2,218.00 2,161.67 0.00 0.00 17,661 0 529,841 0 1-43/P-26 0292186400 W 220100 30 2,347.00 2,278.33 0.00 0.00 30,405 0 912,156 0 1-51N-20 0292230400 W 220100 30 2,451.00 2,374.33 0.00 0.00 3,645 0 109,369 0 1-69N-19 0292202000 W 220100 30 2,404.00 2,341.30 0.00 0.00 5,012 0 150,389 0 2-06/J-22 0292169900 G 220100 30 4,624.00 4,302.60 0.00 0.00 0 109,750 0 3,292,522 2-12/0-16 0292230200 G 220100 30 4,624.00 4,302.60 0.00 0.00 0 24,051 0 721,552 2-16/M-16 0292188500 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 2-22/L -14 0292193100 W 220100 30 2,281.00 2,230.77 0.00 0.00 16,672 0 500,179 0 2-24/M-12 0292241800 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 2-30/0-09 0292222800 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 2-34/P-14 0292166200 W 220100 30 2,339.00 2,268.90 0.00 0.00 20,905 0 627,166 0 2-44/R-12 0292176700 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 2-54/0-12 0292221800 W 220100 30 2,316.00 2,256.73 0.00 0.00 23,984 0 719,525 0 2-64/U-10 0292205500 W 220100 24 2,439.00 2,394.00 0.00 0.00 672 0 16,145 0 2-70/U-15 0292189900 W 220100 30 2,471.00 2,401.37 0.00 0.00 3,443 0 103,297 0 3-07/N-28 0292191100 W 220100 30 2,249.00 2,194.33 0.00 0.00 18,169 0 545,072 0 3-41/K-39 0292187800 W 220100 30 2,220.00 2,114.27 0.00 0.00 25,258 0 757,747 0 3-45/M-39 0292181100 W 220100 30 2,334.00 2,274.37 0.00 0.00 13,380 0 401,412 0 3-47/0-35 0292156900 W 220100 30 2,300.00 2,246.50 0.00 0.00 9,371 0 281,145 0 4-04/T -26 0292196800 W 220100 30 2,305.00 2,247.73 0.00 0.00 7,958 0 238,751 0 4-08/P-27 0292169200 W 220100 30 2,151.00 1,818.00 0.00 0.00 10,771 0 323,146 0 4-14/R-34 0292186300 W 220100 30 2,243.00 2,034.80 0.00 0.00 10,895 0 326,852 0 4-40/P-43 0292226500 W 220100 30 2,387.00 2,327.50 0.00 0.00 3,545 0 106,377 0 4-44/M-44 0292225400 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 4-48/K-43 0292197200 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 5-01/SD-07 0292051800 G 220100 30 4,624.00 4,302.60 0.00 0.00 0 65,186 0 1,955,588 5-02/SD-10 0292064000 W 220100 30 1,590.00 1,519.13 0.00 0.00 8,496 0 254,902 0 220100 Pool Injection Totals...................... 7,901,662 9,312,727 Form 10-406 Run Date: 12/03/97 Run Time: 11:20:10 BP Exploration (Alaska) Inc. API C Field Days Number L & Pool In 50- S Code Oper. END Gathering Center Totals.......................................... Well Name State of Alaska Alaska Oil and Gas Conservation Commission Monthly Injection Report 20 AAC 25.432 Endicott Operating Area Endicott Tubing Pressure Casing Pressure Max Average Max Average PSIG PSIG PSIG PSIG Field I njection Total................................................................................ Form 10-406 Daily Average Injection Liquid Gas BBL MCF Page 2 November, 1997 Total Monthly Injection Liquid Gas BBL MCF 7,902,448 9,312,727 7,902,448 9,312,727 Run Date: Run Time: PA OA 12/03/97 11 :22:20 SDN END ~ ~ r% g ~ >ø ::::s¡» 0(1} g~ ,...., -- I»::::! Œ;} (/1 Chi' a o S :3 ~ 6' ::3 BP Exploration (Alaska) Inc. Oil Movement Accounting & Reporting Alaska Oil and Gas Conservation Commission Oil Reconciliation Report From Date: To Date: Description Pipeline Deliveries, END TOTAL PIPELINE DELIVERIES NGL Deliveries, END TOTAL NGL DELIVERIES Allocation of SLP to EPA Load Diesel, SON Upstream Losses, SON Downstream Losses, SDN TOTAL FIELD PRODUCTION ,.."'" ""..... ¡'-\~1 h ~ r-n ~ M'1 ,~::;? --- --,. u;.. c,Q -,¡. < m o I hereby certify that the foregoing is true and correct to the best of my knowledge. Vaul fl th Signed: Mtt. t/ò0 Title: Page 1 11/1/97 11/30/97 Oil Volume 1,819,026 1,819,026 -125,510 -125,510 -1,673,246 o o o 20,270 {lOY , :Pv Date: IZÞ/?7 Report # SUMDUD - 05 . BP EXPLORATION (ALASKA), INC. Name of Operator 1. WELL NO. 2. API NUMBER C 50- L S STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 MC 25.230 SAG DELTA NORTH PRODUCTION FACILITY GAS LIQUIDS Nav 1997 Field and Pool Month and Year of Production 4. FIELD 6. DAYS 7. GAS-OIL 8. TUBING DAILY AVERAGE PRODUCTION & POOL METI- IN RATIO PSIG 9. OIL 110. WATERll1. GAS CODE OPER (BPD) (BPD) (MCF) 029-0000006 P 220150 7 29 N/A N/A 5.2 o 0 I hereby certify that the foregoing is true and correct to the best of my knowledge Signed fJruJ tJ Ii¡ 15. Date: Ii? /ð/?1 Title: Manager, Volume, Royalty & Severance FORM 10-405 REV 12-1-85 TOTAL TOTAL MONTHLY PRODUCTION 12. OIL 113. WATER 114. GAS (BBL) (BBL) (MCF) 151 o o 151 o o SUBMIT IN DUPLICATE Run Date: 12/03/97 Run Time: 11:19:02 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Production Report BP Exploration (Alaska) Inc. Well API C Field M Days Gas-Oil Name Number L & Pool T In Ratio 50- S Code H Oper. 2-32/SN-03 2208400 0 220150 2 30 625 2-38/SN-01 2209000 0 220150 2 30 626 220150 Sag Delta North Pool Production Totals.......................... Form 10-405 20 AAC 25.230 Endicott Operating Area Daily Average Production Oil Water Gas BBL BBL MCF Tubing PSIG 292 292 257 419 932 4,965 160 262 Page 3 November, 1997 Total Monthly Production Oil Water Gas BBL BBL MCF 7,706 12,564 20,270 27,951 148,963 4,813 7,867 176,914 12,680 Run Date: 12/03/97 Run Time: 11 :21 :59 BP Exploration (Alaska) Inc. API C Field Number L & Pool 50- S Code 1-11/SN-04 0292210700 W 220150 5-03/SD-09 0292063900 W 220150 220150 Pool Injection Totals...................... Well Name Days In Oper. 30 30 END Gathering Center Totals.......................................... State of Alaska Alaska Oil and Gas Conservation Commission Monthly Injection Report 20 AAC 25.432 Endicott Operating Area Sag Delta North Unit Tubing Pressure Casing Pressure Daily Average Injection Max Average Max Average Liquid Gas PSIG PSIG PSIG PSIG BBL MCF 2,267.00 2,035.00 2,221.57 1,944.60 0.00 0.00 0.00 0.00 6,733 5,966 Field I njection Total................................................................................ » :ü' :n &1' C' '-"" ?:.f1i C') t,¡)- 6" ê} iJ§ ;rJ' ~n, C'... ' C':; c ~ 3 ëñ' en õ' ~ Form 10-406 Ç-¡ :;:0 m n n¡ ('::~ .....' (.Ç C,Q ........¡ < rT1 o . . Page 1 November, 1997 Total Monthly Injection Liquid Gas BBL MCF o o 202,017 178,981 380,998 o o o 380,998 o 380,998 o Run Date: Run Time: PA OA 01/06/98 10:14:31 EPA END BP Exploration (Alaska) Inc. Oil Movement Accounting & Reporting Alaska Oil and Gas Conservation Commission Oil Reconciliation Report From Date: To Date: 12/1/97 12/31/97 Description Pipeline Deliveries, END TOTAL PIPELINE DELIVERIES NGL Deliveries, END TOTAL NGL DELIVERIES Allocation of SLP to SON ;, '0 ,~~. ..-" ..- Load Diesel, EPA Upstream Losses, EPA Downstream Losses, E P A TOTAL FIELD PRODUCTION "..-.,,,...... r'~'f"j ;-..:? - ~ 'iF- 6 '::;:i I hereby certify that the foregoing is true and correct to the best of my knowledge. fup/ (j fit¡ Signed: Title: Mfo¡t. IlbL I llö 'í 4 S;y. Page 1 Oil Volume 1,843,475 1,843,475 -144,781 -144,781 -24,036 -41 o o 1,674,617 Date: I. Zfß Report # SUM DUD - 05 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 MC 25.230 BP EXPLORATION (ALASKA), INC. Name of Operator ENDICOTT PRODUCTION FACILITY GAS LIQUIDS Field and Pool 1. WELL NO. 2, API NUMBER 3. C 4. FIELD 5 6. DAYS 7. GAS-OIL 8. TUBING DAILY AVERAGE PRODUCTION 50- L & POOL MET!- IN RATIO PSIG 9. OIL 110. WATER 1l. GAS S CODE OPER (BPD) (BPD) (MCF) 029-0000002 P 220100 7 31 N/A N/A 4663.9 o o I hereby certify t;~ the foregoing is true and correct to the best of my knowledge Signed f 1ud /J !J¡ 15. Title: Manager, Volume, Royalty & Severance Date: /, 1.1& TOTAL 144,580 o FORM 10-405 REV 12- 1-85 Dee 1997 Month and Year of Production TOTAL MONTHLY PRODUCTION 12. OIL 113. WATER 14. GAS (BBL) (BBL) (MCF) 144,580 o o o SUBMIT IN DUPLICATE State of Alaska Run Date: 01/06/98 Alaska Oil and Gas Conservation Commission Run Time: 10:10:36 Monthly Production Report 20 AAC 25.230 Page 1 BP Exploration (Alaska) Inc. Endicott Operating Area December, 1997 Daily Average Production Total Monthly Production Well API C Field M Days Gas-Oil Tubing Oil Water Gas Oil Water Gas Name Number L & Pool T In Ratio PSIG BBL BBL MCF BBL BBL MCF 50- S Code H Oper. 1-01/J-19 2180100 0 220100 1 31 8,636 1,758 1,936 1,241 16,720 60,018 38,458 518,316 1-03/P-16 2260100 0 220100 1 31 7,475 2,126 1,507 3,443 11,264 46,714 106,727 349,190 1-09A1L-21 2174301 0 220100 1 31 4,815 293 853 616 4,105 26,430 19,092 127,259 1-17 A11-17 2210001 0 220100 2 31 483 365 391 1,320 189 12,118 40,914 5,848 1-19/1-18 2256900 0 220100 8 0 0 0 0 0 0 0 0 0 1-21/K-25 2200500 0 220100 1 31 8,207 357 787 27 6,455 24,383 826 200,105 1-25A1K-22 2172201 0 220100 1 31 730 276 670 48 489 20,784 1,503 15,170 1-27/P-20 2169300 0 220100 1 31 9,400 1 ,444 2,332 5,553 21,919 72,289 172,135 679,488 1-29/M-25 2166900 0 220100 1 31 8,096 487 3,059 2,604 24,766 94,826 80,722 767,748 1-31/M-21 2256200 0 220100 1 31 1,307 467 680 6,197 889 21,080 192,113 27,548 1-33/M-23 2257700 0 220100 1 31 488 321 672 6,833 328 20,822 211,818 10,154 1-35/0-25 2167200 0 220100 1 22 8,813 1,765 701 784 6,180 15,427 17,256 135,951 1-39/P-17 2182700 0 220100 2 31 7,935 754 613 9,207 4,864 19,001 285,431 150,780 1-45/0-26 2199100 0 220100 8 0 0 0 0 0 0 0 0 0 1-47 AlM-20 2162501 0 220100 8 0 0 0 0 0 0 0 0 0 1-49/P-21 2184100 0 220100 8 0 0 0 0 0 0 0 0 0 1-55/R-25 2178800 0 220100 8 0 0 0 0 0 0 0 0 0 1-57/R-23 2187300 0 220100 8 0 0 0 0 0 0 0 0 0 1-61/0-20 2252000 0 220100 1 31 10,652 1,292 910 9,915 9,692 28,206 307,375 300,445 1-63/T-22 2190500 0 220100 1 24 14,526 2,053 920 1,314 13,370 22,090 31,526 320,878 1-65/N-25 2262700 0 220100 1 31 4,130 1,537 1,561 4,556 6,448 48,404 141,228 199,893 1-67/T-20 2198500 0 220100 8 0 0 0 0 0 0 0 0 0 2-04/M-19 2158500 0 220100 1 31 6,630 650 2,220 6,142 14,719 68,819 190,416 456,276 2-08/K-16 2177100 0 220100 2 31 5,187 427 956 10,145 4,956 29,624 314,487 153,645 2-14/0-16 2163900 0 220100 1 31 3,912 373 3,527 11 ,428 13,797 109,330 354,266 427,694 2-18/L-16 2203200 0 220100 1 31 9,823 388 1,197 10,259 11,755 37,096 318,033 364,392 2-20/L-15 2204800 0 220100 2 31 2,849 283 353 78 1,005 10,930 2,425 31,142 2-26/N-14 2181500 0 220100 8 0 0 0 0 0 0 0 0 0 2-28/P-19 2184700 0 220100 1 31 7,823 730 967 10,239 7,564 29,971 317,411 234,469 2-36/0-14 2201400 0 220100 1 31 12,097 1 ,402 1,807 4,579 21,856 56,009 141,959 677,530 2-40/S-22 2252700 0 220100 1 12 9,880 482 758 11 7,492 9,099 134 89,899 2-42/P-13 2189200 0 220100 8 0 0 0 0 0 0 0 0 0 2-44A10-11 2176701 0 220100 2 26 1,270 287 999 156 1,268 25,972 4,059 32,976 2-46B/S-13 2192102 0 220100 1 26 569 285 983 384 559 25,549 9,981 14,529 2-48/0-13 2261200 0 220100 1 31 12,994 2,203 1 ,439 2,431 18,698 44,608 75,364 579,640 2-50/U-08 2236700 0 220100 2 31 5,897 352 429 1,261 2,529 13,297 39,097 78,411 2-52/S-14 2175000 0 220100 1 3 20,723 2,459 63 61 1,299 188 184 3,896 2-58/S-09 2204100 0 220100 8 0 0 0 0 0 0 0 0 0 Form 10-405 · State of Alaska Run Date: 01/06/98 Alaska Oil and Gas Conservation Commission Run Time: 10: 10:36 Monthly Production Report 20 AAC 25.230 Page 2 BP Exploration (Alaska) Inc. Endicott Operating Area December, 1997 Daily Average Production Total Monthly Production Well API C Field M Days Gas-Oil Tubing Oil Water Gas Oil Water Gas Name Number L & Pool T In Ratio PSIG BBL BBL MCF BBL BBL MCF 50- S Code H Oper. 2-60/U-13 2237500 0 220100 2 31 761 281 186 1,338 142 5,767 41,478 4,390 2-62/0-17 2164800 0 220100 8 0 0 0 0 0 0 0 0 0 2-68/S-17 2185800 0 220100 8 0 0 0 0 0 0 0 0 0 3-01/N-29 2167800 0 220100 8 0 0 0 0 0 0 0 0 0 3-03/J-33 2230600 0 220100 1 21 19,738 1,019 856 140 16,902 17,983 2,950 354,948 3-05/0-29 2162400 0 220100 2 28 547 368 485 1,837 265 13,566 51 ,433 7,418 3-09/L-28A 2178001 0 220100 1 31 1,179 442 2,951 11,384 3,477 91,466 352,898 107,796 3-11/M-30 2184800 0 220100 2 31 1,322 383 1,391 6,454 1,839 43,129 200,080 57,023 3-15/K-33 2175100 0 220100 1 31 7,825 978 1,888 14,579 14,777 58,540 451,937 458,082 3-17B/M-31 2194602 0 220100 1 30 791 343 154 867 122 4,626 26,003 3,661 3-19/R-28 2246300 0 220100 8 0 0 0 0 0 0 0 0 0 3-21/L-34 2171400 0 220100 2 5 995 384 512 7,872 509 2,560 39,359 2,546 3-23/N-32 2164500 0 220100 8 0 0 0 0 0 0 0 0 0 3-25/M-27 2212500 0 220100 2 31 20,648 801 1,027 2,590 21,211 31,846 80,300 657,544 3-27/M-33 2158600 0 220100 2 24 973 353 761 2,114 740 18,273 50,741 17,771 3-29/J-32 2210600 0 220100 1 31 811 348 1,358 1,985 1,101 42,089 61,526 34,122 3-33/K-37 2166800 0 220100 8 0 0 0 0 0 0 0 0 0 3-35/L-36 2170100 0 220100 2 2 909 1,213 6 1,055 5 11 2,109 10 3-37/L-35 2255400 0 220100 1 13 619 376 577 2,982 357 7,498 38,765 4,640 3-39A/1-37 2176401 0 220100 1 31 1,350 391 1,968 5,314 2,656 60,998 164,733 82,344 3-43/P-36 2241600 0 220100 8 0 0 0 0 0 0 0 0 0 3-49A1M-40 2173502 0 220100 2 16 675 437 270 779 182 4,314 12,462 2,913 4-02/0-28 2178900 0 220100 1 31 22,691 881 1,124 2,559 25,502 34,840 79,337 790,550 4-06A10-30 2172301 0 220100 2 25 7,736 430 364 4,780 2,817 9,102 119,494 70,417 4-10/M-28 2246400 0 220100 1 31 12,864 2,438 2,474 311 31,824 76,690 9,636 986,551 4-18/S-30 2189600 0 220100 8 0 0 0 0 0 0 0 0 0 4-20/M-35 2164001 0 220100 8 0 0 0 0 0 0 0 0 0 4-26/0-34 2183500 0 220100 8 0 0 0 0 0 0 0 0 0 4-28/N-37 2187000 0 220100 2 7 948 415 148 4,460 140 1,036 31,217 982 4-32/K-38 2255900 0 220100 1 26 625 337 314 1,981 196 8,160 51,507 5,103 4-34/0-38 2270500 0 220100 1 2 714 990 4 351 3 7 701 5 4-38/K-34 2248200 0 220100 1 31 6,953 1,320 4,496 839 31,259 139,367 26,024 969,044 4-42/P-38 2173100 0 220100 8 0 0 0 0 0 0 0 0 0 4-46/N-39 2195700 0 220100 2 31 6,240 404 312 1,823 1,946 9,665 56,499 60,312 4-50/K-41 2194000 0 220100 8 0 0 0 0 0 0 0 0 0 220100 Endicott Pool Production Totals.......................... 1,674,617 5,366,129 11,631,444 Form 10-405 State of Alaska Run Date: 01/06/98 Alaska Oil and Gas Conservation Commission Run Time: 10: 12:36 Monthly Injection Report 20 AAC 25.432 Page 1 BP Exploration (Alaska) Inc. Endicott Operating Area Endicott December, 1997 Tubing Pressure Casing Pressure Daily Average Injection Total Monthly Injection Well API C Field Days Max Average Max Average Liquid Gas Liquid Gas Name Number L & Pool In PSIG PSIG PSIG PSIG BBL MCF BBL MCF 50- S Code Oper. 2-02/P-18 0292156800 D 220036 1 202.00 202.00 0.00 0.00 196 0 196 0 220036 Pool Injection Totals...................... 196 0 1-05/0-20 0292160500 G 220100 31 4,841.00 4,458.55 0.00 0.00 0 76,540 0 2,372,763 1-15/P-25 0292236100 G 220100 31 4,841.00 4,458.55 0.00 0.00 0 29,924 0 927,645 1-23/0-15 0292251000 W 220100 31 2,370.00 2,284.48 0.00 0.00 21,648 0 671,114 0 1-37/P-24 0292174800 W 220100 31 2,368.00 2,288.61 0.00 0.00 10,427 0 323,261 0 1-41/0-23 0292171300 W 220100 31 2,201.00 2,120.97 0.00 0.00 17,018 0 527,570 0 1-43/P-26 0292186400 W 220100 31 2,308.00 2,227.13 0.00 0.00 31,372 0 972,554 0 1-51N-20 0292230400 W 220100 31 2,401.00 2,313.65 0.00 0.00 3,038 0 94,200 0 1-69N-19 0292202000 W 220100 31 2,343.00 2,275.29 0.00 0.00 4,327 0 134,156 0 2-06/J-22 0292169900 G 220100 31 4,841.00 4,458.55 0.00 0.00 0 119,252 0 3,696,839 2-12/Q-16 0292230200 G 220100 31 4,841.00 4,458.55 0.00 0.00 0 39,913 0 1,237,318 2-16/M-16 0292188500 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 2-22/L-14 0292193100 W 220100 31 2,238.00 2,172.26 0.00 0.00 16,751 0 519,284 0 2-24/M-12 0292241800 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 2-30/0-09 0292222800 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 2-34/P-14 0292166200 W 220100 31 2,296.00 2,220.68 0.00 0.00 20,861 0 646,717 0 2-44/R-12 0292176700 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 2-54/Q-12 0292221800 W 220100 31 2,233.00 2,201.58 0.00 0.00 25,701 0 796,731 0 2-64/U-10 0292205500 W 220100 29 2,403.00 2,312.17 0.00 0.00 1,569 0 45,515 0 2-70/U-15 0292189900 W 220100 10 2,421.00 2,349.60 0.00 0.00 4,488 0 44,885 0 3-07/N-28 0292191100 W 220100 31 2,200.00 2,134.55 0.00 0.00 18,302 0 567,370 0 3-41/K-39 0292187800 W 220100 31 2,775.00 2,174.97 0.00 0.00 25,238 0 782,388 0 3-45/M-39 0292181100 W 220100 31 2,295.00 2,219.61 0.00 0.00 12,732 0 394,696 0 3-47/Q-35 0292156900 W 220100 31 2,273.00 2,198.87 0.00 0.00 8,722 0 270,403 0 4-04/T -26 0292196800 W 220100 31 2,266.00 2,194.03 0.00 0.00 7,249 0 224,721 0 4-08/P-27 0292169200 W 220100 31 1,821.00 1,787.58 0.00 0.00 10,476 0 324,778 0 4-14/R-34 0292186300 W 220100 31 2,053.00 2,000.35 0.00 0.00 10,746 0 333,147 0 4-40/P-43 0292226500 W 220100 31 2,345.00 2,272.13 0.00 0.00 2,575 0 79,833 0 4-44/M-44 0292225400 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 4-48/K-43 0292197200 W 220100 0 0.00 0.00 0.00 0.00 0 0 0 0 5-01/SD-07 0292051800 G 220100 31 4,841.00 4,458.55 0.00 0.00 0 71,008 0 2,201,257 5-02/S D-1 0 0292064000 W 220100 31 2,063.00 1,576.13 0.00 0.00 9,863 0 305,758 0 220100 Pool Injection Totals...................... 8,059,081 10,435,822 Form 10-406 Run Date: 01/06/98 Run Time: 10: 12:36 BP Exploration (Alaska) Inc. API C Field Days Number L & Pool In 50- S Code Oper. END Gathering Center Totals.......................................... Well Name State of Alaska Alaska Oil and Gas Conservation Commission Monthly Injection Report 20 AAC 25.432 Endicott Operating Area Endicott Tubing Pressure Casing Pressure Max Average Max Average PSIG PSIG PSIG PSIG Field Injection Total................................................................................ Form 10-406 Daily Average Injection Liquid Gas BBL MCF . Page 2 December, 1997 Total Monthly Injection Liquid Gas BBL MCF 8,059,277 10,435,822 8,059,277 10,435,822 Run Date: Run Time: PA OA 01/06/98 10:09:30 SDN END '€~ "'!:' A C) (;) a §, w v- 5' '::I BP Exploration (Alaska) Inc. Oil Movement Accounting & Reporting Alaska Oil and Gas Conservation Commission Oil Reconciliation Report From Date: To Date: 12/1/97 12/31/97 Description Pipeline Deliveries, END TOTAL PIPELINE DELIVERIES NGL Deliveries, END TOTAL NGL DELIVERIES Allocation of SLP to EPA Load Diesel, SDN ". ~",' 70· ïfl r') 1""M Downstream Losses, SDN Upstream Losses, SDN {.;j~J ',iId~ <: TOTAL FIELD PRODUCTION .,...... .~O c.o I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed: fuui /J. , Title: ,.6¡L 1&, f(J( 4S#. Page 1 Oil Volume 1,843,475 1,843,475 -144,781 -144,781 -1,674,658 o o o 24,036 Date: !. 7.18 Report # SUMDUD - 05 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 MC 25.230 BP EXPLORATION (ALASKA), INC. Name of Operator SAG DELTA NORTH PRODUCTION FACILlN GAS LIQUIDS Dee 1997 Field and Pool Month and Year of Production 1. WELL 2. API NUMBER C 4. FIELD 6. DAYS 7. GAS-OIL 8. TUBING DAILY AVERAGE PRODUCTION NO. 50- L & POOL MET!- IN RATIO PSIG 9. OIL 110. WATER 11. GAS S CODE OPER (BPD) (BPD) (MCF) 029-0000006 P 220150 7 31 N/A N/A 6.5 0 0 ~:;:::cem~ ¡;;/õo;nïi¡e and ca"ect ta the be. of my knaw~dge Title: Manager, Volume, Royalty & Severance Date: 1.1, 'IS 15. TOTAL FORM 10-405 REV 12-1-85 TOTAL MONTHLY PRODUCTION 12. OIL 113. WATER 114. GAS (BBL) (BBL) (MCF) 201 o o 201 o o SUBMIT IN DUPLICATE Run Date: 01/06/98 Run Time: 10:10:36 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Production Report BP Exploration (Alaska) Inc. Well API C Field M Days Gas-Oil Name Number L & Pool T In Ratio 50- S Code H Oper. 2-32/SN-03 2208400 0 220150 2 31 627 2-38/SN-01 2209000 0 220150 2 31 626 220150 Sag Delta North Pool Production Totals.......................... Form 10-405 20 AAC 25.230 Endicott Operating Area Daily Average Production Oil Water Gas BBL BBL MCF Tubing PSIG 297 295 296 480 951 5,182 185 300 .. Page 3 December, 1997 Total Monthly Production Oil Water Gas BBL BBL MCF 9,169 14,867 5,748 9,307 29,495 160,654 24,036 190,149 15,055 Run Date: 01/06/98 Run Time: 10:07:22 BP Exploration (Alaska) Inc. API C Field Number L & Pool 50- S Code 1-11/SN-04 0292210700 W 220150 5-03/SD-09 0292063900 W 220150 220150 Pool Injection Totals...................... Well Name END Gathering Center Totals.......................................... Days In Oper. 31 31 State of Alaska Alaska Oil and Gas Conservation Commission Monthly Injection Report 20 AAC 25.432 Endicott Operating Area Sag Delta North Unit Tubing Pressure Casing Pressure Daily Average Injection Max Average Max Average Liquid Gas PSIG PSIG PSIG PSIG BBL MCF 2,228.00 1,980.00 2,176.97 1,934.06 0.00 0.00 0.00 0.00 6,373 6,137 Field I njection Total...... .......................................................................... Form 10-406 . . . Page 1 December, 1997 Total Monthly Injection Liquid Gas BBL MCF o o 197,573 190,251 387,824 o o o 387,824 o 387,824 o