Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
GP Anna Platform - Hilcorp Alaska LLC
State of Alaska AOGCC Gas Disposition Files Year: 2016 Facility: GP Anna Platform Operator: Hilcorp Alaska LLC STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1330000005 2. Facility Name Anna Platform 3. Field Granite Point 4. Operator Hilcorp Alaska LLC 5. MonthNear of Disposition January -16 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 MIDDLE KENAI OIL 280150 100.007 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 1871 10. Pilot and Purge 1240 11. Assist Gas 0 12. Fuel gas used in lease operations. 19545 13. Other (see instructions) 0 Official Use Only Authorization>1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-13) 22656 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 19 Waste: MCF 17. Transferred from: 0 s W `7 �a 18. Transferred to: (Express as a negative #) (3272) CommissionerDate 19. Remarks: Purchased Gas: 19 Tranferred From: 0 Transferred To: Bruce Platform & Granite Point Tank Farm (COV's am (3272) Fuel used by Drilling Rig (Purchased and Prod): 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. �f% Signature _ '9wmz � ��J,�d Title Production Analyst Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Leanne Watkins Phone 713-757-5211 Date 2/19/2016 Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate l '7-1- &JOTI!, Anna Platform January -16 EXCESS FLARING DUETO HOLE IN EXCESS FLARING NECESSARY UNTIL HOLE 1/1/2016 124250 1330000005 1/1/2016 0:00:00 23:59:00 1/1/2016 P 75.0 GPTF GAS LINE. IN GPTF IS REPAIRED. EXCESS FLARING DUE TO HOLE IN EXCESS FLARING NECESSARY UNTIL HOLE 1/1/2016 124250 1330000005 1/2/2016 0:00:00 23:59:00 1/2/2016 P 73.0 GPTF GAS LINE. IN GPTF IS REPAIRED. EXCESS FLARING DUE TO HOLE IN EXCESS FLARING NECESSARY UNTIL HOLE 1/1/2016 124250 1330000005 1/3/2016 0:00:00 23:59:00 1/3/2016 P 64.0 GPTF GAS LINE. IN GPTF IS REPAIRED. EXCESS FLARING DUE TO HOLE IN EXCESS FLARING NECESSARY UNTIL HOLE 1/1/2016 124250 1330000005 1/4/2016 0:00:00 23:59:00 1/4/2016 P 58.0 GPTF GAS LINE. IN GPTF IS REPAIRED. EXCESS FLARING DUE TO HOLE IN EXCESS FLARING NECESSARY UNTIL HOLE 1/1/2016 124250 1330000005 1/5/2016 0:00:00 23:59:00 1/5/2016 P 61.0 GPTF GAS LINE. IN GPTF IS REPAIRED. EXCESS FLARING DUE TO HOLE IN EXCESS FLARING NECESSARY UNTIL HOLE 1/1/2016 124250 1330000005 1/6/2016 0:00:00 23:59:00 1/6/2016 P 38.0 GPTF GAS LINE. IN GPTF IS REPAIRED. EXCESS FLARING DUE TO HOLE IN EXCESS FLARING NECESSARY UNTIL HOLE 1/1/2016 124250 1330000005 1/7/2016 00000 235900 1/7/2016 P 31.0 GPTF GAS LINE. IN GPTF IS REPAIRED. EXCESS FLARING DUE TO HOLE IN EXCESS FLARING NECESSARY UNTIL HOLE 1/1/2016 124250 1330000005 1/8/2016 0:00:00 23:59:00 1/8/2016 P 70.0 GPTF GAS LINE. IN GPTF IS REPAIRED. EXCESS FLARING DUE TO HOLE IN EXCESS FLARING NECESSARY UNTIL HOLE 1/1/2016 124250 1330000005 1/9/2016 0:00:00 23:59:00 1/9/2016 P 70.0 GPTF GAS LINE. IN GPTF IS REPAIRED. EXCESS FLARING DUE TO HOLE IN EXCESS FLARING NECESSARY UNTIL HOLE 1/1/2016 124250 1330000005 1/10/2016 0:00:00 23:59:00 1/10/2016 P 35.0 GPTF GAS LINE. IN GPTF IS REPAIRED. EXCESS FLARING DUE TO HOLE IN EXCESS FLARING NECESSARY UNTIL HOLE 1/1/2016 124250 1330000005 1/11/2016 0:00:00 23:59:00 1/11/2016 P 169.0 GPTF GAS LINE. IN GPTF IS REPAIRED. EXCESS FLARING DUE TO HOLE IN EXCESS FLARING NECESSARY UNTIL HOLE 1/1/2016 124250 1330000005 1/12/2016 0:00:00 23:59:00 1/12/2016 P 58.0 GPTF GAS LINE. IN GPTF IS REPAIRED. EXCESS FLARING DUE TO HOLE IN EXCESS FLARING NECESSARY UNTIL HOLE 1/1/2016 124250 1330000005 1/13/2016 0:00:00 23:59:00 1/13/2016 P 62.0 GPTF GAS LINE. IN GPTF IS REPAIRED. EXCESS FLARING DUE TO HOLE IN EXCESS FLARING NECESSARY UNTIL HOLE 1/1/2016 124250 1330000005 1/14/2016 0:00:00 23:59:00 1/14/2016 P 68.0 GPTF GAS LINE. IN GPTF IS REPAIRED. EXCESS FLARING DUE TO HOLE IN EXCESS FLARING NECESSARY UNTIL HOLE 1/1/2016 124250 1330000005 1/15/2016 0:00:00 23:59:00 1/15/2016 P 62.0 GPTF GAS LINE. IN GPTF IS REPAIRED. EXCESS FLARING DUE TO HOLE IN EXCESS FLARING NECESSARY UNTIL HOLE 1/1/2016 124250 1330000005 1/16/2016 0:00:00 23:59:00 1/16/2016 P 70.0 GPTF GAS LINE. IN GPTF IS REPAIRED. EXCESS FLARING DUE TO HOLE IN EXCESS FLARING NECESSARY UNTIL HOLE 1/1/2016 124250 1330000005 1/17/2016 0:00:00 23:59:00 1/17/2016 P 72.0 GPTF GAS LINE. IN GPTF IS REPAIRED. EXCESS FLARING DUE TO HOLE IN EXCESS FLARING NECESSARY UNTIL HOLE 1/1/2016 124250 1330000005 1/18/2016 0:00:00 23:59:00 1/18/2016 P 68.0 GPTF GAS LINE. IN GPTF IS REPAIRED. EXCESS FLARING DUE TO HOLE IN EXCESS FLARING NECESSARY UNTIL HOLE 1/1/2016 124250 1330000005 1/19/2016 0:00:00 23:59:00 1/19/2016 P 62.0 GPTF GAS LINE. IN GPTF IS REPAIRED. 1871 UNABLE TO SH I P GAS DUE TO HOLE 1/1/2016 124250 1330000005 1/20/2016 0:00:00 23:59:00 1/20/2016 P 490 FLARE IN OIPELINE EXCESS FLARING DUE TO HOLE IN EXCESS FLARING NECESSARY UNTIL HOLE 1/1/2016 124250 1330000005 1/21/2016 0:00:00 23:59:00 1/21/2016 P 52.0 GPTF GAS LINE. IN GPTF IS REPAIRED. EXCESS FLARING DUE TO HOLE IN EXCESS FLARING NECESSARY UNTIL HOLE 1/1/2016 124250 1330000005 1/22/2016 0:00:00 23:59:00 1/22/2016 P 49.0 GPTF GAS LINE. IN GPTF IS REPAIRED. EXCESS FLARING DUE TO HOLE IN EXCESS FLARING NECESSARY UNTIL HOLE 1/1/2016 124250 1330000005 1/23/2016 0:00:00 23:59:00 1/23/2016 P 54.0 GPTF GAS LINE. IN GPTF IS REPAIRED. EXCESS FLARING DUE TO HOLE IN EXCESS FLARING NECESSARY UNTIL HOLE 1/1/2016 124250 1330000005 1/24/2016 0:00:00 23:59:00 1/24/2016 P 52.0 GPTF GAS LINE. IN GPTF IS REPAIRED. EXCESS FLARING DUE TO HOLE IN EXCESS FLARING NECESSARY UNTIL HOLE 1/1/2016 124250 1330000005 1/25/2016 0:00:00 23:59:00 1/25/2016 P 51.0 GPTF GAS LINE. IN GPTF IS REPAIRED. EXCESS FLARING DUE TO HOLE IN EXCESS FLARING NECESSARY UNTIL HOLE 1/1/2016 124250 1330000005 1/26/2016 0:00:00 23:59:00 1/26/2016 P 51.0 GPTF GAS LINE. IN GPTF IS REPAIRED. EXCESS FLARING DUE TO HOLE IN EXCESS FLARING NECESSARY UNTIL HOLE 1/1/2016 124250 1330000005 1/27/2016 0:00:00 23:59:00 1/27/2016 P 51.0 GPTF GAS LINE. IN GPTF IS REPAIRED. EXCESS FLARING DUE TO HOLE IN EXCESS FLARING NECESSARY UNTIL HOLE 1/1/2016 124250 1330000005 1/28/2016 0:00:00 23:59:00 1/28/2016 P 65.0 GPTF GAS LINE. IN GPTF IS REPAIRED. EXCESS FLARING DUE TO HOLE IN EXCESS FLARING NECESSARY UNTIL HOLE 1/1/2016 124250 1330000005 1/29/2016 0:00:00 23:59:00 1/29/2016 P 48.0 GPTF GAS LINE. IN GPTF IS REPAIRED. EXCESS FLARING DUE TO HOLE IN EXCESS FLARING NECESSARY UNTIL HOLE 1/1/2016 124250 1330000005 1/30/2016 0:00:00 23:59:00 1/30/2016 P 36.0 GPTF GAS LINE. IN GPTF IS REPAIRED. EXCESS FLARING DUE TO HOLE IN EXCESS FLARING NECESSARY UNTIL HOLE 1/1/2016 124250 1330000005 1/31/2016 0:00:00 23:59:00 1/31/2016 P 47.0 GPTF GAS LINE. IN GPTF IS REPAIRED. 1871 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1330000005 2. Facility Name Anna Platform 3. Field Granite Point 4. Operator I Hilcorp Alaska LLC 5. Month/Year of Disposition I February -16 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 MIDDLE KENAI OIL 280150 100.00% 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 1826 10. Pilot and Purge 1160 11. Assist Gas 0 12. Fuel gas used in lease operations. 18733 13. Other (see instructions) 0 Official Use Only Authorization>1 hr. Safety /$2b MCF 14. TOTAL VOLUME (ITEMS 6-13) 21719 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 Commissioner Date 18. Transferred to: (Express as a negative #) (1890) 19. Remarks: Purchased Gas: 0 Tranferred From: 0 Transferred To: Bruce Platform & Granite Point Tank Farm (COV's anc (1890) Fuel used by Drilling Rig (Purchased and Prod): 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature Title Production Analyst Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AA C25.235. Printed Name Leanne Watkins Phone 713-757-5211 Date 3/21/2016 Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate ✓1•L -¢lis114 FP.hrijnry-16 R tDate O p No FacilitVNo Date Flared StartTime Endin Time End Date Planned MCF Description of Flaring Event Action Taken to Minimize Volume EXCESS FLARING NECESSARY UNTIL HOLE IN 2/1/2016 124250 1330000005 2/1/2016 0.00.00 23:59:00 2/1/2016 P 47.0 Pipeline shutin from Bruce to GPTF GPTF IS REPAIRED. EXCESS FLARING NECESSARY UNTIL HOLE IN 2/1/2016 124250 1330000005 2/2/2016 22:00:00 23:59:00 2/2/2016 P 44.0 Pipeline shutin from Bruce to GPTF GPTF IS REPAIRED. EXCESS FLARING NECESSARY UNTIL HOLE IN 2/1/2016 124250 1330000005 2/3/2016 22:00:00 23:59:00 2/3/2016 P 68.0 Pipeline shutin from Bruce to GPTF GPTF IS REPAIRED. EXCESS FLARING NECESSARY UNTIL HOLE IN 211/2016 124250 1330000005 2/4/2016 22:00:00 23:59:00 2/4/2016 P 87.0 Pipeline shutin from Bruce to GPTF GPTF IS REPAIRED. EXCESS FLARING NECESSARY UNTIL HOLE IN 211/2016 124250 1330000005 2/5/2016 22:00:00 23:59:00 2/5/2016 P 53.0 Pipeline shutin from Bruce to GPTF GPTF IS REPAIRED. EXCESS FLARING NECESSARY UNTIL HOLE IN 2/1/2016 124250 1330000005 2/6/2016 22:00:00 23:59:00 2/6/2016 P 48.0 Pipeline shutin from Bruce to GPTF GPTF IS REPAIRED. EXCESS FLARING NECESSARY UNTIL HOLE IN 2/1/2016 124250 1330000005 2/7/2016 22:00:00 23:59:00 2/7/2016 P 93.0 Pipeline shutin from Bruce to GPTF GPTF IS REPAIRED. EXCESS FLARING NECESSARY UNTIL HOLE IN 2/1/2016 124250 1330000005 2/8/2016 22:00.00 23:59:00 2/8/2016 P 56.0 Pipeline shutin from Bruce to GPTF GPTF IS REPAIRED. EXCESS FLARING NECESSARY UNTIL HOLE IN 2/1/2016 124250 1330000005 219/2016 22:00:00 23:59:00 2/9/2016 P 48.0 Pipeline shutin from Bruce to GPTF GPTF IS REPAIRED. EXCESS FLARING NECESSARY UNTIL HOLE INGPTF 2/1/2016 124250 1330000005 2110/2016 220000 23:59:00 2/1012016 P 55.0 Pipeline shutin from Bruce to GPTF IS REPAIRED. EXCESS FLARING NECESSARY UNTIL HOLE IN 2/1/2016 124250 1330000005 2/11/2016 22:00:00 23:59:00 2/11/2016 P 63.0 Pipeline shutin from Bruce to GPTF GPTF IS REPAIRED. EXCESS FLARING NECESSARY UNTIL HOLE INGPTF 2/1/2016 124250 1330000005 2/12/2016 22:00:00 23:59:00 2/12/2016 P 62.0 Pipeline shutin from Bruce to GPTF IS REPAIRED. EXCESS FLARING NECESSARY UNTIL HOLE IN 2/1/2016 124250 1330000005 2/13/2016 22:00:00 23:59:00 2/13/2016 P 63.0 Pipeline shutin from Bruce to GPTF GPTF 15 REPAIRED. EXCESS FLARING NECESSARY UNTIL HOLE IN 211/2016 124250 1330000005 2/14/2016 220000 235900 2/14/2016 P 54.0 Pipeline shutin from Bruce to GPTF GPTF 15 REPAIRED. EXCESS FLARING NECESSARY UNTIL HOLE IN 2/1/2016 124250 1330000005 2/15/2016 22:00:00 23:59:00 2115/2016 P 57.0 Pipeline shutin from Bruce to GPTF GPTF IS REPAIRED. EXCESS FLARING NECESSARY UNTIL HOLE INGPTF 2/1/2016 124250 1330000005 2/16/2016 22:00:00 23:59:00 2/16/2016 P 62.0 Pipeline shutin from Bruce to GPTF IS REPAIRED. 2/1/2016 124250 1330000005 2/17!2016 22:00:00 23:59:00 2/17!2016 P 56.0 Pipeline shutin from Bruce to GPTF EXCESS FLARING NECESS.Aiy UNTIL HOLE INGPTF 15 REPAIRED. EXCESS FLARING NECESSARY UNTIL HOLE IN 2/1/2016 124250 1330000005 2/18/2016 220000 23:59:00 2/18/2016 P 63.0 Pipeline shutin from Bruce to GPTF GPTF IS REPAIRED. EXCESS FLARING NECESSARY UNTIL HOLE IN 2/1/2016 124250 1330000005 2/19/2016 22:00:00 23:59:00 2/19/2016 P 64.0 Pipeline shutin from Bruce to GPTF GPTF IS REPAIRED. EXCESS FLARING NECESSARY UNTIL HOLE IN 2/1/2016 124250 1330000005 2/20/2016 22:00:00 23:59:00 2/20/2016 P 65.0 Pipeline shutin from Bruce to GPTF GPTF IS REPAIRED. 1826.0 EXCESS FLARING NECESSARY UNTIL HOLE IN 2/1/2016 124250 1330000005 2/21/2016 22:00:00 23:59:00 2/21/2016 P 61.0 Pipeline shutin from Bruce to GPTF GPTF IS REPAIRED. EXCESS FLARING NECESSARY UNTIL HOLE IN 2/1/2016 124250 1330000005 2/22/2016 22:00:00 23:59:00 2/22/2016 P 72.0 Pipeline shutin from Bruce to GPTF GPTF IS REPAIRED. EXCESS FLARING NECESSARY UNTIL HOLE IN 2/1/2016 124250 1330000005 2/23/2016 22:00:00 23:59:00 2/23/2016 P 66.0 Pipeline shutin from Bruce to GPTF GPTF IS REPAIRED. EXCESS FLARING NECESSARY UNTIL HOLE IN 2/1/2016 124250 1330000005 2/24/2016 22:00:00 23:59:00 2/24/2016 P 87.0 Pipeline shutin from Bruce to GPTF GPTF IS REPAIRED. EXCESS FLARING NECESSARY UNTIL HOLE IN 2/1/2016 124250 1330000005 2/25/2016 22:00:00 23:59:00 2/25/2016 P 85.0 Pipeline shutin from Bruce to GPTF GPTF IS REPAIRED. EXCESS FLARING NECESSARY UNTIL HOLE IN 2/1/2016 124250 1330000005 2/26/2016 22:00:00 23:59:00 2/26/2016 P 101.0 Pipeline shutin from Bruce to GPTF GPTF IS REPAIRED. EXCESS FLARING NECESSARY UNTIL HOLE IN 2/1/2016 124250 1330000005 2/27/2016 22:00:00 23:59:00 2/27/2016 P 96.0 Pipeline shutin from Bruce to GPTF GPTF IS REPAIRED. EXCESS FLARING NECESSARY UNTIL HOLE IN 2/1/2016 124250 1330000005 2/28/2016 22:00:00 23:59:00 2/28/2016 P 46.0 Pipeline shutin from Bruce to GPTF GPTF IS REPAIRED. EXCESS FLARING NECESSARY UNTIL HOLE IN 2/1/2016 124250 1330000005 2/29/2016 22:00:00 23:59:00 2/29/2016 P 4.0 Pipeline shutin from Bruce to GPTF GPTF IS REPAIRED. 1826.0 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1330000005 2. Facility Name Anna Platform 3. Field Granite Point 4. Operator Nilcorp Alaska LLC 5. MonthNear of Disposition March -16 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 MIDDLE KENAI OIL 280150 100.00% 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 1287 10. Pilot and Purge 1219 11. Assist Gas 0 12. Fuel gas used in lease operations. 22135 13. Other (see instructions) 0 Official Use Only Authorization>1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-13) 24641 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 Commissioner J Date 18. Transferred to: (Express as a negative #) (1883) 19. Remarks: Purchased Gas: 0 Tranferred From: 0 Transferred To: Bruce Platform & Granite Point Tank Farm (COVs and pros (1883) Fuel used by Drilling Rig (Purchased and Prod): 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature //1/l!/ltt /mei Title Production Analyst to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Leanne Watkins Phone 713-757-5211 Dale 4/18/2016 AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Subrnit in Duplicate vIrL- 4123116 Anna Platform March -16 EXCESS VENTING DUE TO BLOW EXCESS VENTING NECESSARY UNTIL WELL 3/1/2016 124250 1330000005 3/1/2016 0:00:00 23:59:00 3/1/2016 P 20.0 DOWN OF WELL. MAINTENANCE COULD BE COMPLETED. 3/1/2016 124250 1330000005 3/2/2016 0:00:00 23:59:00 3/2/2016 P 30.0 EXCESS VENTING DUE TO BLOW EXCESS VENTING NECESSARY UNTIL WELL DOWN OF WELL. MAINTENANCE COULD BE COMPLETED. 3/1/2016 124250 1330000005 3/3/2016 0:00:00 23:59:00 3/3/2016 P 42.0 EXCESS VENTING DUE TO BLOW EXCESS VENTING NECESSARY UNTIL WELL DOWN OF WELL. MAINTENANCE COULD BE COMPLETED. 3/1/2016 124250 1330000005 3/4/2016 0:00:00 23:59:00 3/4/2016 P 40.0 EXCESS VENTING DUE TO BLOW EXCESS VENTING NECESSARY UNTIL WELL DOWN OF WELL. MAINTENANCE COULD BE COMPLETED. 3/1/2016 124250 1330000005 3/5/2016 0:00:00 23:59:00 3/5/2016 P 29.0 EXCESS VENTING DUE TO BLOW EXCESS VENTING NECESSARY UNTIL WELL DOWN OF WELL. MAINTENANCE COULD BE COMPLETED. 311/2016 124250 1330000005 3/6/2016 0:00:00 23:59:00 3/6/2016 P 47.0 EXCESS VENTING DUE TO BLOW EXCESS VENTING NECESSARY UNTIL WELLDOWN OF WELL. MAINTENANCE COULD BE COMPLETED. 3/1/2016 124250 1330000005 3/7/2016 0:00:00 23:59:00 3/7/2016 P 65.0 EXCESS VENTING DUE TO BLOW EXCESS VENTING NECESSARY UNTIL WELL DOWN OF WELL. MAINTENANCE COULD BE COMPLETED. 3/1/2016 124250 1330000005 3/8/2016 0:00:00 23:59:00 3/8/2016 P 68.0 EXCESS VENTING DUE TO BLOW EXCESS VENTING NECESSARY UNTIL WELLDOWN OF WELL. MAINTENANCE COULD BE COMPLETED. 3/1/2016 124250 1330000005 3/9/2016 0:00:00 23:59:00 3/9/2016 P 97.0 EXCESS VENTING DUE TO BLOW EXCESS VENTING NECESSARY UNTIL WELL DOWN OF WELL. MAINTENANCE COULD BE COMPLETED. 3/1/2016 124250 1330000005 3/10/2016 0:00:00 23:59:00 3/10/2016 P 148.0 EXCESS VENTING DUE TO BLOW EXCESS VENTING NECESSARY UNTIL WELL DOWN OF WELL. MAINTENANCE COULD BE COMPLETED. 3/1/2016 124250 1330000005 3/11/2016 0:00:00 23:59:00 3/11/2016 P 112.0 EXCESS VENTING DUE TO BLOW EXCESS VENTING NECESSARY UNTIL WELL DOWN OF WELL. MAINTENANCE COULD BE COMPLETED. 3/1/2016 124250 1330000005 3/12/2016 0:00:00 23:59:00 3/12/2016 P 85.0 EXCESS VENTING DUE TO BLOW EXCESS VENTING NECESSARY UNTIL WELL DOWN OF WELL. MAINTENANCE COULD BE COMPLETED. 3/1/2016 124250 1330000005 3/13/2016 0:00:00 23:59:00 3/13/2016 P 53.0 EXCESS VENTING DUE TO BLOW EXCESS VENTING NECESSARY UNTIL WELL DOWN OF WELL. MAINTENANCE COULD BE COMPLETED. EXCESS VENTING DUE TO BLOW EXCESS VENTING NECESSARY UNTIL WELL 3/1/2016 124250 1330000005 3/14/2016 0:00:00 23:59:00 3/14/2016 P 11.0 DOWN OF WELL. MAINTENANCE COULD BE COMPLETED. EXCESS VENTING DUE TO BLOW EXCESS VENTING NECESSARY UNTIL WELL 311/2016 124250 1330000005 3/15/2016 0:00:00 23:59:00 3/15/2016 P 4.0 DOWN OF WELL. MAINTENANCE COULD BE COMPLETED. EXCESS VENTING DUE TO BLOW EXCESS VENTING NECESSARY UNTIL WELL 3/1/2016 124250 1330000005 3/19/2016 0:00:00 23:59:00 3/19/2016 p 4.0 DOWN OF WELL. MAINTENANCE COULD BE COMPLETED. EXCESS VENTING DUE TO BLOW EXCESS VENTING NECESSARY UNTIL WELL 3/1/2016 124250 1330000005 3/20/2016 0:00:00 23:59:00 3/20/2016 P 37.0 DOWN Of WELL. MAINTENANCE COULD BE COMPLETED. EXCESS VENTING DUE TO BLOW EXCESS VENTING NECESSARY UNTIL WELL 311/2016 124250 1330000005 3/22/2016 0:00:00 23:59:00 3/22/2016 p 64.0 DOWN OF WELL. MAINTENANCE COULD BE COMPLETED. EXCESS VENTING DUE TO BLOW EXCESS VENTING NECESSARY UNTILWELL 3/1/2016 124250 1330000005 3/23/2016 0:00:00 23:59:00 3/23/2016 p 83.0 DOWN OF WELL. MAINTENANCE COULD BE COMPLETED. EXCESS VENTING DUE TO BLOW EXCESS VENTING NECESSARY UNTILWELLDOWN 3/1/2016 124250 1330000005 3/24/2016 0:00:00 23:59:00 3/24/2016 P 78.0 Of WELL. MAINTENANCE COULD BE COMPLETED. EXCESS VENTING DUE TO BLOW EXCESS VENTING NECESSARY UNTIL WELLDOWN 3!1/2016 124250 1330000005 3/25/2016 0:00:00 23:59:00 3/25/2016 P 61.0 OF WELL. MAINTENANCE COULD BE COMPLETED. EXCESS VENTING DUE TO BLOW EXCESS VENTING NECESSARY UNTIL WELL 3/1/2016 124250 1330000005 3/26/2016 0:00:00 23:59:00 3/26/2016 P 20.0 DOWN OF WELL. MAINTENANCE COULD BE COMPLETED. EXCESS VENTING DUE TO BLOW EXCESS VENTING NECESSARY UNTIL WELLDOWN 3/1/2016 124250 1330000005 3/27/2016 0:00:00 23:59:00 3/27/2016 P 12.0 OF WELL. MAINTENANCE COULD BE COMPLETED. EXCESS VENTING DUE TO BLOW EXCESS VENTING NECESSARY UNTIL WELL 3/1/2016 124250 1330000005 3/28/2016 0:00:00 23:59:00 3/28/2016 P 8.0 DOWN OF WELL. MAINTENANCE COULD BE COMPLETED. 3/1/2016 124250 1330000005 3/29/2016 0:00:00 23:59:00 3/29/2016 p 7.0 EXCESS VENTING DUE TO BLOW EXCESS VENTING NECESSARY UNTIL WELL DOWN OF WELL. MAINTENANCE COULD BE COMPLETED. EXCESS VENTING DUE TO BLOW EXCESS VENTING NECESSARY UNTIL WELL 3/1/2016 124250 1330000005 3!30/2016 0:00:00 23:59:00 3/30!2016 P 15.0 DOWN OF WELL. I MAINTENANCE COULD BE COMPLETED. 1287.0 EXCESS VENTING DUE TO BLOW EXCESS VENTING NECESSARY UNTIL WELL 3/1/2016 124250 1330000005 3/31/2016 0:00:00 23:59:00 3/31/2016 P 47.0 DOWN OF WELL. MAINTENANCE COULD BE COMPLETED. 1287.0 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1330000005 2. Facility Name Anna Platform 3. Field Granite Point 4. Operator I Hilcorp Alaska LLC 5. MonthNear of Disposition I April -16 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Cade Percent 7. Reinjected 0 MIDDLE KENAI OIL 280150 100.00% 8. Flared or vented 1 hour or less 31 9. Flared or vented more than 1 hour (see instr.) 917 10. Pilot and Purge 1153 11. Assist Gas 0 12. Fuel gas used in lease operations. 22129 13. Other (see instructions) 0 Official Use Only Authorization>1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-13) 24230 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation 9/� MCF 16. Purchased gas 54 Waste: MCF 17. Transferred from: 0 2—_/ ,. .(� 18. Transferred to: (Express as a negative #) (1602) Commissioner Date 19. Remarks: Purchased Gas: 54 Tranferred From: 0 Transferred To: Bruce Platform & Granite Point Tank Farm (COV's ani (1602) Fuel used by Drilling Rig (Purchased and Prod): 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Q Note: All volumes must be corrected �OilZl!i Signature wG r�624 Title Production Analyst to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Leanne Watkins Phone 713-757-5211 Date 5/19/2016 AAC25.235. Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate V71— Anna Platlorm Anril-16 EXCESS FLARING DUE TO GAS 4/1/2016 124250 1330000005 4/1/2016 0:00:00 12:00:00 4/25/2016 P 37.0 PIPELINE SHUTIN FROM BRUCE TO EXCESS FLARING NECESSARY UNTILTHE PIPELINE COULD BE REPAIRED. GPTF. EXCESS FLARING DUE TO GAS 4/1/2016 124250 1330000005 4/1/2016 0:00:00 12:00:00 4/25/2016 P 33.0 PIPELINE SHUTIN FROM BRUCE TO EXCESS FLARING NECESSARY UNTILTHE PIPELINE COULD BE REPAIRED. GPTF. EXCESS FLARING DUE TO GAS 4/1/2016 124250 1330000005 4/1/2016 0:00:00 12:00:00 4/25/2016 P 20.0 PIPELINE SHUTIN FROM BRUCE TO EXCESS FLARING NECESSARY UNTILTHE PIPELINE COULD BE REPAIRED. GPTF. EXCESS FLARING DUE TO GAS 4/1/2016 124250 1330000005 4/1/2016 0:00:00 12:00:00 4/25/2016 P 32.0 PIPELINE SHUTIN FROM BRUCE TO EXCESS FLARING NECESSARY UNTIL THE PIPELINE COULD BE REPAIRED. GPTF. EXCESS FLARING DUE TO GAS 4/1/2016 124250 1330000005 4/1/2016 0:00:00 12:00:00 4/25/2016 P 32.0 PIPELINE SHUTIN FROM BRUCE TO EXCESS FLARING NECESSARY UNTIL THE PIPELINE COULD BE REPAIRED. GPTF. EXCESS FLARING DUE TO GAS 4/1/2016 124250 1330000005 4/1/2016 0:00:00 12:00:00 4/25/2016 P 31.0 PIPELINE SHUTIN FROM BRUCE TO EXCESS FLARING NECESSARY UNTIL THE PIPELINE COULD BE REPAIRED. GPTF. EXCESS FLARING DUE TO GAS 4!1/2016 124250 1330000005 4/1/2016 0:00:00 12:00:00 4/25/2016 P 24.0 PIPELINE SHUTIN FROM BRUCE TO EXCESS FLARING NECESSARY UNTIL THE PIPELINE COULD BE REPAIRED. GPTF. EXCESS FLARING DUE TO GAS EXCESS FLARING NECESSARY UNTIL THE 4/1/2016 124250 1330000005 4/1/2016 00000 12:00:00 4/25/2016 P 34.0 PIPELINE SHUTIN FROM BRUCE TO PIPELINE COULD BE REPAIRED. GPTF. EXCESS FLARING DUE TO GAS EXCESS FLARING NECESSARY UNTIL THE 4/1/2016 124250 1330000005 4/1/2016 0:00:00 12:00:00 4/25/2016 P 42.0 PIPELINE SHUTIN FROM BRUCE TO PIPELINE COULD BE REPAIRED. GPTF. EXCESS FLARING DUE TO GAS 4/1/2016 124250 1330000005 4/1/2016 0:00:00 12:00:00 4/25/2016 P 31.0 PIPELINE SHUTIN FROM BRUCE TO EXCESS FLARING NECESSARY UNTIL THE PIPELINE COULD BE REPAIRED. GPTF. EXCESS FLARING DUE TO GAS 4/1/2016 124250 1330000005 4/1/2016 0:00:00 12:00:00 4/25/2016 P 33.0 PIPELINE SHUTIN FROM BRUCE TO EXCESS FLARING NECESSARY UNTIL THE PIPELINE COULD BE REPAIRED. GPTF. EXCESS FLARING DUE TO GAS EXCESS FLARING NECESSARY UNTILTHE 4/1/2016 124250 1330000005 4/1/2016 0:00:00 12:00:00 4/25/2016 P 54.0 PIPELINE SHUTIN FROM BRUCE TO PIPELINE COULD BE REPAIRED. GPTF. EXCESS FLARING DUE TOGAS EXCESS FLARING NECESSARY UNTILTHE 4/1/2016 124250 1330000005 4/1/2016 0:00:00 12:00:00 4/25/2016 P 84.0 PIPELINE SHUTIN FROM BRUCE TO PIPELINE COULD BE REPAIRED. GPTF. Total > 1 hr. 917.0 EXCESS FLARING DUE TO GAS EXCESS FLARING NECESSARY UNTIL THE 4/1/2016 124250 1330000005 4/1/2016 0:00:00 12:00:00 4/25/2016 P 68.0 PIPELINE SHUTIN FROM BRUCE TO PIPELINE COULD BE REPAIRED. GPTF. EXCESS FLARING DUE TO GAS EXCESS FLARING NECESSARY UNTILTHE 4/1/2016 124250 1330000005 4/1/2016 0:00:00 12:00:00 4/25/2016 P 33.0 PIPELINE SHUTIN FROM BRUCE TO PIPELINE COULD BE REPAIRED. GPTF. EXCESS FLARING DUE TO GAS EXCESS FLARING NECESSARY UNTILTHE 4/1/2016 124250 1330000005 4/1/2016 0:00:00 12:00:00 4/25/2016 P 39.0 PIPELINE SHUTIN FROM BRUCE TO PIPELINE COULD BE REPAIRED. GPTF. EXCESS FLARING DUE TO GAS EXCESS FLARING NECESSARY UNTIL THE 4/1/2016 124250 1330000005 4/1/2016 0:00:00 12:00:00 4/25/2016 P 1.0 PIPELINE SHUTIN FROM BRUCETO PIPELINE COULD BE REPAIRED. GPTF. EXCESS FLARING DUE TO GAS EXCESS FLARING NECESSARY UNTILTHE 4/1/2016 124250 1330000005 4/1/2016 0:00:00 12:00:00 4/25/2016 P 15.0 PIPELINE SHUTIN FROM BRUCE TO PIPELINE COULD BE REPAIRED. GPTF. EXCESS FLARING DUE TO GAS EXCESS FLARING NECESSARY UNTILTHE 4/1/2016 124250 1330000005 4/1/2016 0:00:00 12:00:00 4/25/2016 P 22.0 PIPELINE SHUTIN FROM BRUCE TO PIPELINE COULD BE REPAIRED. GPTF. EXCESS FLARING DUE TO GAS EXCESS FLARING NECESSARY UNTILTHE 4/1/2016 124250 1330000005 4/1/2016 0:00:00 12:00:00 4/25/2016 P 27.0 PIPELINE SHUTIN FROM BRUCE TO PIPELINE COULD BE REPAIRED. GPTF. EXCESS FLARING DUE TO GAS EXCESS FLARING NECESSARY UNTILTHE 4/1/2016 124250 1330000005 4/1/2016 0:00:00 12:00:00 4/25/2016 P 33.0 PIPELINE SHUTIN FROM BRUCETO PIPELINE COULD BE REPAIRED. GPTF. EXCESS FLARING DUE TO GAS EXCESS FLARING NECESSARY UNTILTHE 4/1/2016 124250 1330000005 4/1/2016 0:00:00 12:00:00 4/25/2016 P 42.0 PIPELINE SHUTIN FROM BRUCETO PIPELINE COULD BE REPAIRED. GPTF. EXCESS FLARING DUE TO GAS EXCESS FLARING NECESSARY UNTILTHE 4/1/2016 124250 1330000005 4/1/2016 0:00:00 12:00:00 4/25/2016 P 71.0 PIPELINE SHUTIN FROM BRUCE TO PIPELINE COULD BE REPAIRED. GPTF. EXCESS FLARING DUE TO GAS EXCESS FLARING NECESSARY UNTILTHE 4/1/2016 124250 1330000005 4/1/2016 0:00:00 12:00:00 4/25/2016 P 44.0 PIPELINE SHUTIN FROM BRUCE TO PIPELINE COULD BE REPAIRED. GPTF. EXCESS FLARING DUE TO GAS EXCESS FLARING NECESSARY UNTILTHE 4/1/2016 124250 1330000005 4/1/2016 0:00:00 12:00:00 4/25/2016 P 35.0 PIPELINE SHUTIN FROM BRUCETO PIPELINE COULD BE REPAIRED. GPTF. Total > 1 hr. 917.0 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1330000005 2. Facility Name Anna Platform 3. Field Granite Point 4. Operator Hilcorp Alaska LLC 5. Month/Year of Disposition I May -16 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 MIDDLE KENAI OIL 280150 100.00% 8. Flared or vented 1 hour or less 371 9. Flared or vented more than 1 hour (see instr.) 52 10. Pilot and Purge 1116 11. Assist Gas 0 12. Fuel gas used in lease operations. 22379 13. Other (see instructions) 0 Official Use Only Authorization>1 hr: Safety SZ MCF 14. TOTAL VOLUME (ITEMS 6.13) 23918 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0� Commissioner Date 18. Transferred to: (Express as a negative #) (5064) 19. Remarks: Purchased Gas: 0 Tranferred From: 0 Transferred To: Bruce Platform & Granite Point Tank Farts (COV's am (5064) Fuel used by Drilling Rig (Purchased and Prod): 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. �p Signature �o�ymldi m f Title Production Analyst Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Leanne Watkins Phone 713-757-5211 Date 6/23/2016 Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate Anna Platform May -16 52.0 5/1/2016 124250 1330000005 5/15/2016 8:00:00 9:30:00 5/15/2016 U 52.0 EXCESS VENTING DUE TO PLC ISSUES THAT CAUSED SHUT IN OF THE #1 GINGHAM JEXCIIS VENTING NECESSARY UNTIL THE PLC ISSUE COULD BE CORRECTED AND BINGHAM STARTED UP. 52.0 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1330000005 2. Facility Name Anna Platform 3. Field Granite Point 4. Operator Hilcorp Alaska LLC S. Month/Year of Disposition I June -16 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 MIDDLE KENAI OIL 280150 100.00% 8. Flared or vented 1 hour or less 150 9. Flared or vented more than 1 hour (see instr.) 441 10. Pilot and Purge 1109 11. Assist Gas 0 12. Fuel gas used in lease operations. 22134 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety � � I MCF Vr� 3 1 I 14. TOTAL VOLUME (ITEMS 6-13) 23834 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 137 Waste: MCF 17. Transferred from: 09- /-14 18. Transferred to: (Express as a negative #) (3765) Commissioner Date 19. Remarks: Purchased Gas: 137 Tranferred From: 0 Transferred To: Bruce Platform & Granite Point Tank Farm (COV's ani (3765) Fuel used by Drilling Rig (Purchased and Prod): 0 1 hereby certify that the foregoing is true and correct to the best of my knovAedge. i Signature �GCA/y'✓J26 i%i� Title Production Analyst Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Leanne Watkins Phone 713-757-5211 Date 7117/2016 Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate Anna Plaffnrm lune -16 441.0 EXCESSLWENTINGINECESSARYOUNTIL0 EXCESSffLARING®UEPTO06HUTDOWN 6/1/2016 124250 1330000005 6/1/2016 9:30:00 20:30:00 6/1/2016 P© 289.0 INSPECTIONEEOULDMECEOMPLETEMNDLWRU OFCWRIFLARI &NNUAI.[OSHUTDDWMNSPECTION. BROUGHT®ACK®NLINE. EXCESSUVENTINGENECESSARYMJNTILrVALVE EXCESSffLARING®VEOfO[?1/RU®OWN® CONTROAYEAD LEMS�PLCMA EL[ANDIRED 6/1/2016 124250 1330000005 6/21/2016 3:30:00 5:30:00 6/21/2016 U 152.0 FORISLIDEIVALVE/PLCISLIDELWALVEO ANDf�ELAYff�DDEDLCOOPLCCffARDOANDl3/RU CONTROVIPROBLEMS. BROUGHTIIBACK®NEIN E. 441.0 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1330000005 2. Facility Name Anna Platform 3. Field Granite Point 4. Operator I Hilcorp Alaska LLC 5. MonthNear of Disposition I July -16 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 MIDDLE KENAI OIL 280150 100.00% 8. Flared or vented 1 hour or less 90 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 1120 11. Assist Gas 0 12. Fuel gas used in lease operations. 22979 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-13) 24189 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 Commissioner Date 18. Transferred to: (Express as a negative #) ( 3563) 19. Remarks: Purchased Gas: 0 Tranferred From: 0 Transferred To: Bruce Platform & Granite Point Tank Farm (COVs an( (3563) Fuel used by Drilling Rig (Purchased and Prod): 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. �pp Note: All Volumes must be corrected Signature Tommi ,J,iFim Title Production Analyst to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Leanne Watkins Phone 713-757-5211 Date 8/19/2016 AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1330000005 2. Facility Name Anna Platform 3. Field Granite Point 4. Operator Hilcorp Alaska LLC 5. Month/Year of Disposition August -16 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 MIDDLE KENAI OIL 280150 100.00% 8. Flared or vented 1 hour or less 41 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 960 11. Assist Gas 0 12. Fuel gas used in lease operations. 23193 13. Other (see instructions) 0 Official Use Only Authorization>1 hr Safety MCF 14. TOTAL VOLUME (ITEMS 6-13) 24194 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 Commissioner Date 18. Transferred to: (Express as a negative #) (3208) 19. Remarks: Purchased Gas: 0 Tranferred From: 0 Transferred To: Bruce Platform & Granite Point Tank Farm (COV's anc (3208) Fuel used by Drilling Rig (Purchased and Prod): 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. � Note: All volumes must be corrected Signature �✓l2G Title Production Analyst to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Leanne Watkins Phone 713-757-5211 Date 9/20/2016 AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1330000005 2. Facility Name Anna Platform 3. Field Granite Point 4. Operator I Hilcorp Alaska LLC 5. MonthNear of Disposition I September -16 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 MIDDLE KENAI OIL 280150 100.00% 8. Flared or vented 1 hour or less 516 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 968 11. Assist Gas 0 12. Fuel gas used in lease operations. 21663 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-13) 23147 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: Cl 18. Transferred to: (Express as a negative #) (4084) Commissioner Date 19. Remarks: Purchased Gas: 0 Tranferred From: 0 Transferred To: Bruce Platform & Granite Point Tank Farm (COV's an( (4084) Fuel used by Drilling Rig (Purchased and Prod): 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Signature G46 -Title Production Analyst Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Leanne Watkins Phone 713-757-5211 Date 10/20/2016 Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1330000005 2. Facility Name Anna Platform 3. Field Granite Point 4. Operator Hilcorp Alaska LLC 5. MonthNear of Disposition I October -16 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected p MIDDLE KENAI OIL 280150 100.00% 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 136 10. Pilot and Purge 947 11. Assist Gas 0 12. Fuel gas used in lease operations. 23170 13. Other (see instructions) 0 Official Use Only authorization >1 hr: Safety /3 MCF t, 7-1- 14. TOTAL VOLUME (ITEMS 6-13) 24253 Lease Use MC 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 43 Waste: MCF 17. Transferred from: 0 Z /� —17 / 18. Transferred to: (Express as a negative #) (6076) 'Commissioner Date 19. Remarks: Purchased Gas: 43 Tranferred From: 0 Transferred To: Bruce Platform & Granite Point Tank Farm (COVs ani (6076) Fuel used by Drilling Rig (Purchased and Prod): 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature Title Production Analyst to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Leanne Watkins Phone 713-757-5211 Date 11/16/2016 AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate AOGCC Excess Flare Report October -2016 ANNA PLATFORM - EXPENSE Date Ending RptDate OpNo FacilityNo Flared Start Time Time End Date Planned MCF Description of Flaring Event JOILCtion Taken to Minimize Volume EXCESS FLARING DUE TO SHUT DOWN OF EXCESS FLARING NECESSARY UNTIL 10/1/2016 124250 1330000005 10/7/2016 11:00:00 15:30:00 10/7/2016 Y 70 THE VRU COMPRESSOR FOR SCHEDULED MAINTENANCE COULD BE COMPLETED 10/1/2016 124250 1330000005 10/21/2016 0:00:00 8:00:00 10/23/2016 Y MAINTENANCE TO CHECK FILTERS. AND VRU COMPRESSOR COULD BE BROUGHT BACK ONLINE. EXCESS FLARING DUE TO #2 BINGHAM EXCESS FLARING NECESSARY UNTIL 66 COMPRESSOR SHUTDOWN FOR MAINTENANCE COMPLETE AND SCHEDULED MAINTENANCE. COMPRESSOR BROUGHT BACK ONLINE. 136 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1330000005 2. Facility Name Anna Platform 3. Field Granite Point 4. Operator Hilcorp Alaska LLC 5. MonthNear of Disposition I November -16 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 MIDDLE KENAI OIL 280150 100.00% 8. Flared or vented 1 hour or less 179 9. Flared or vented more than 1 hour (see instr.) 860 10. Pilot and Purge 1122 11. Assist Gas 0 12. Fuel gas used in lease operations. 20975 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety � (�� MCF 14. TOTAL VOLUME (ITEMS 6-13) 23136 Lease Use VTV 3 MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 80 Waste: MCF 17. Transferred from: 0 3 -! 7-1 Commissioner Date 18. Transferred to: (Express as a negative #) (6898) 19. Remarks: Purchased Gas: 80 Tranferred From: 0 Transferred To: Bruce Platform & Granite Point Tank Farm (COV's ani (6898) Fuel used by Drilling Rig (Purchased and Prod): 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. //�� Signature �(L.' CGlIb116 �� Title Production Analyst Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Leanne Watkins Phone 713-757-5211 Date 12/16/2016 Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate IBM Bar mm AOGCC Excess Flare Report Ird November-2016 ANNA PLATFORM - EXPENSE Date Ending RptDate OpNo FacilityNo Flared Start Time Time End Date Planned MCF Description of Flaring Event 11/1/2016 124250 1330000005 11/15/2016 0:00:00 235900 11/28/2016 Y 860 EXCESS FLARING DUE TO LIQUID IN PIPELINE. 860 Action Taken to Minimize Volume EXCESS FLARING NECESSARY UNTIL LIQUID IN PIPELINE IS REMOVED. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1330000005 2. Facility Name Anna Platform 3. Field Granite Point 4. Operator Hilcorp Alaska LLC 5. Month/Year of Disposition December -16 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 MIDDLE KENAI OIL 280150 100.00% 8. Flared or vented 1 hour or less 173 9. Flared or vented more than 1 hour (see instr.) 1415 10. Pilot and Purge 1194 11. Assist Gas 0 12. Fuel gas used in lease operations. 18348 13. Other (see instructions) 0 Official Use Only Authorization >1 hr Safety MCE 14. TOTAL VOLUME (ITEMS 6-13) 21130 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 43 Waste: MCF 17. Transferred from: 0 -2& I! -3-2& Commissioner Date 18. Transferred to: (Express as a negative #) (8822) 19. Remarks: Purchased Gas: 43 Tranferred From: 0 Transferred To: Bruce Platform & Granite Point Tank Farm (COV's ani (8822) Fuel used by Drilling Rig (Purchased and Prod): 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature u �� Title Production Analyst to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Leanne Watkins Phone 713-757-5211 Date 1/20/2017 AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate Action Taken to Minimize Volume EXCESS FLARING NECESSARY UNTIL EXCESS GAS IS FLARED OR TAKEN UP BY GPTF. EXCESS FLARING NECESSARY UNTIL EXCESS GAS IS FLARED OR TAKEN UP BY GPTF, EXCESS FLARING NECESSARY UNTIL EXCESS GAS IS FLARED OR TAKEN UP BY GPTF. AOGCC Excess Flare Report December -2016 ANNA PLATFORM -EXPENSE Date Ending RptDate OpNo Facility No Flared Start Time Time End Date Planned MCF Description of Flaring Event EXCESS FLARING DUE TO GPTF NOT 12/1/2016 124250 1330000005 12/8/2016 15:00:00 235900 12/8/2016-. U 29 BEING ABLE TO HANDLE THE EXCESS GAS. EXCESS FLARING DUE TO GPTF NOT 12/1/2016 124250 1330000005 12/10/2016 0:00:00 0:59:00 12/13/2016 U 219 BEING ABLE TO HANDLE THE EXCESS GAS. EXCESS FLARING DUE TO GPTF NOT 12/1/2016 124250 1330000005 12/14/2016 0:00:00 2159:00 12/31/2016 Y 1,167 BEING ABLE TO HANDLE THE EXCESS GAS. 1,415' Action Taken to Minimize Volume EXCESS FLARING NECESSARY UNTIL EXCESS GAS IS FLARED OR TAKEN UP BY GPTF. EXCESS FLARING NECESSARY UNTIL EXCESS GAS IS FLARED OR TAKEN UP BY GPTF, EXCESS FLARING NECESSARY UNTIL EXCESS GAS IS FLARED OR TAKEN UP BY GPTF.