HomeMy WebLinkAboutGP Anna Platform / UnocalSTATE OF ALASKA
AOGCC
GAS DISPOSITION FILES
YEAR: 2007
FACILITY: GP Anna Platform
OPERATOR: UNOCAL
1. Facility Number
1330000005
2. Facility Narne
ANNA PLATFORM
3. Field
GRANITE POINT
4. Operator
UNOCAL ALASKA
5. Month/Year of Disposition
January -07
Disposition
Volume MGF
20. Fo production from multiple pools, list conofbuUOn of each pool as a percent of
Total Volume.
8. Sold
Q
Pool Name
Pool Code
Percent
7. Reinjected
18742
280150
100.00%
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see Instr.)
0
10. Pilot end Purge
217
11. Used for lease operations (specify In Remarks)
24.841
12. Other (see Instructions)
Q
Auihonzation >1 hr.
Safety
MCI'
13. TOTAL VOLUME (rTEMS 6.12)
25,058
Lease Use
MCF
14. NGL Gas Equivalent
Q
Conservation
MCI'
15. Purchased gas
3,396
waste:
MCF
16. Transferred from:
0
17. Transferred to: (Express as a negative #)
(951)
Commissioner Date
18. Remarks:
Transferred From: Bruce Platform
Transferred To: GPTF -LEX
GPTF -AB
Brace Platform
0
0
(951)
0
I hereby Certify that the foregoing is true and correct to be best of my knowledge.
�/� J1 ILL
Signature (' (Gtn�✓J ! 71. �1n�L .w-- Tito
Production Accountant
Note: Al! volumes must be corrected
to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
AAC25.235.
Printed Name Mary Indihar Phone
713 -432$238 Date February 16, 2007
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Form 10-422 Rev. 2/2004
INSTRUCTIONS ON REVERSE SIDE
Submit In Duplicate
1. Facility Number
1330000005
2. Facility Name
ANNA PLATFORM
3. Field
GRANITE POINT
4. Operator
UNOCAL ALASKA
5. Month/Year of Disposition
February-07
Meech pool as a percent of
Disposition
Volume MCF
20. For production from multiple pools, list contribution
Total Volume.
6. Sol
Q
Pool Name
Pool Code
Percent
7. Reinjected
0
18742
280150
100.00%
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see Instr.)
0
10. Pilot and Purge
196
11. Used for lease operations (specify M Remarks)
24,176
12. Other (see Mstructlons)
Q
Authorization >1 hr,
Safety
MCF
13. TOTAL VOLUME (ITEMS 6 -12)
24.372
Lease Use
MCF
14. NGL Gas Equivalent
Q
Conservation
MCF
15. Purchased gas
2,997
Waste:
MCF
16. Transferred from:
0
17. Transferred to: (Express as a negative #)
(3,669)
Commissioner Date
18. Remarks:
Transferred From: Bruce Platform 0
Transferred To: GPTF -LEX (1.256)
GPTF -AB (2.4!3)
Bruce Platform 0
I hereby certify that the foregoing is true and correct to the best of my knowledge.
y�� Q Q
Signature i ' I �Jr7� tv� U�++— Title Produetlon Accountant
Note: All volumes must be corrected
to pressure of 14.65 psia and 0 a
temperature of 60o F. Authority 20
AAC25.235.
Printed Name Mary IndMar Phone 713-43241238 Date March 12, 2007
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
TY REPORT OF PRODUCED GAS DISPOSITION
1, Facility Number
1330000005
2. Facility Name
ANNA PLATFORM
3. Field
GRANITE POINT
4, Operate(
UNOCAL ALASKA
5. Month/Year of Disposition
March -07
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name
Pool Code
Percent
7. Reinjected
0
18742
280150
100.00%
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instil
0
10. Pilot and Purge
217
11. Used for lease operations (specify in Remarks)
27,139
12. Otter (see instructions)
0
Authorizations hr.
Safety
13. TOTAL VOLUME (ITEMS 6-12)
27,356
Lease Use
MCF
14. NGL Gas Equivalent
0
Conservation
MCF
15. Purchased gas
4,691
Waste:
MCF
16. Transferred from:
0
17. Transferred to: (Express as a negative #)
(6,088)
CommisaIoner Date
18. Remarks:
Transferred From: Bruce Platform
Transferred To: GPTF -LEX
GPTF -AB
Bruce Platform
0 -
(3,035)
(3.054)
0
I hereby certify that the foregoing is we and correct to the best of my knowledge.
I , /
Signature �/ ,� u %.. l / - -
Panted Name Mary Indihar
Title
Proeuetion Accountant
Note: All volumes must be corrected
to pressure of 14.65 Asia and to a
temperature of 60o F. Authority 20
AAC25.235.
Phone
713-432 -6238 Date April 17, 2007
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
ILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
1330000005
2. Facility Name
ANNA PLATFORM
3. Field
GRANITE POINT
4. Operator
UNOCAL ALASKA
5. Month/Year of Disposition
AprII -07
Disposition
Volume MCF
\
20. For production from multiple pools, list contribution of each pod as a percent of ,
Total Vow/um.
6. Sob
0
Pool Name
Pool Code
Percent
7. Reinjected
18742
280150
100.0018
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
305
10. Piot and Purge
210
11. Used for lease operations (specify In Remarks)
25,956
12. Other (see instructions)
0
Authorization >1 hr.
Safety.
X
MCF
13. TOTAL VOLUME (ITEMS 8 -12)
26,471'F
Lease Use
14. NGL Gas Equivalent
0
Conservation
MCF
15. Purchased gas
3,107
Waste:
MC
18. Transferred from:
0
/ - 14 ( // 9t11 i _3 - 0 7
li'�9 �*
17. Transferred to: (Express as a negative k)
(6.744)
Commissioner Deb
saioner
18. Remarks:
Transferred From: Bruce Platform
Transferred To: GPTF -LEX
GPTF.AB
Bruce Platform
0
(
(2.747)
0
I hereby certify that the foregoing is true and correct
Signature \ %
g / t l f (' ( /
to the test of my knowledge.
Title
Production Accountant
Note: All volumes must be whetted
t0 pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
AAC25.235.
Printed Name
Mary Mather Phone
713 -432.8238 Date May 15, 2007
Form 10-422 Rev. 22004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
INSTRUCTIONS ON REVERSE SIDE
Submit In pupilage
UNOCAL
Alas
Date d Time Event
login End Gas MCF planned Detcrlptlon of Incident Category Reason
Steps Taken to
Minimize
Reoccurrence
Actions Taken
Egwpmen•
Down MP-
04/04/2007 05:30 AM 04/04/2007 07:50 PM
305 Y Maint. on Gas
compressor
ANNA PLATFORM
Page 1 of 4
Excess Flare Report
OPERATIONAL SCHEDULED
MAINTENANCE
Month: April Year: 2007
N/A
/ t1
0 /4
N/A
1. Facility Number
1330000005
2. Facility Name
ANNA PLATFORM
3. Field
GRANITE POINT
4. Operator
UNOCAL ALASKA
5. MomtWear of Disposition
May -07
Disposition
Volume MCF
N.
20. For production from multiple pools, fist contribution ofeacb pool as a percent of
Total Volume.
6. Sold
D
Pool Name
Pool Code
Percent
7. Rein)ected
0
18742
280150
100.00%
8. Flared or vented 1 hour or lass
0
9. Flared or vented more than 1 hour (see Instr.)
464
10. Pilot and Purge
217
11. Used for lease operations (specify In Remarks)
21
Authorization >1 br:
platy
� 4
MCF
12. Other (see instructions)
D
13. TOTAL VOLUME (ITEMS
S 8.12) RECEIVED
21,872
Lease Use
MCF
14. NGL Gas Equivalent
JUN 9 9 7007
0
Conservation
MCF
15. Purchased gas
.. ... .. ..
8,271
Waste:
MCF
16. Transferred (tom: AI1ChOf�
0
14167-9
Commissioner
,_ 24 - 0 7
17. Transferred to: (Express as a negative s)
(966)
Date
18. Remarks;
Transferred From: Bruce Platform
Transferred To: GPTF-LEX
GPCF - AB
Bruce Platform
0
0
(mil
0
I hereby certify that the foregoing S true and
Signature Wide, � nYt-
correct to the best of my knowledge.
/ / //(
rg.L -- Title
Production Accountant
Note: All volumes must be corrected
to pressure of 1465 psis and to a
temperature of 60o F. Authority 20
AAC25.235.
( I
Printed Name Mary Indihar Phone
7134324238 Date June 19, 2007
ATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT t F PRODUCED GAS DISPOSITION
Form 10-422 Rev. 2/2004
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
Chevron
N INO
Begin
Dale & Time
End
Event Gas
MCF Planned Description of Incident Category
Reason
Steps Taken to
Minimize
Reoccurrence
Actions Taken
Equipmen
Down MP-
05/04/2007 10.15 PM 05/04/2007 11.59 PM
3
Y FREE WATER KNOCK
OUT VAPOR
RECOVERY UNIT
WENT DOWN DUE TO
LOW SUCTION.'
05/06/2007 12:00 AM 05/06/2007 11:59 PM 32 N FREE WATER KNOCK
OUT VAPOR
RECOVERY UNIT
SHUT DOWN DUE TO
MECHANICAL
FAILURE.!
ANNA PLATFORM
Page 1 of 10
OPERATIONAL
Excess Flare Report
Month: May Yaar. 2007
OTHER: SEE
DESC OF EVENT
05/05/2007 12:01 AM 05/05/2007 11:59 PM 38 N FREE WATER KNOCK OPERATIONAL UNSCHEDULED
OUT VAPOR . _ ' MAINTENANCE
RECOVERY UNIT
SHUT DOWN DUE TO •
MECHANICAL
FAILURE.' .
OPERATIONAL
TROUBLESHOO
MAINTENANCE TING AND
MAINTENANCE!
UNSCHEDULED
�]!A /fir 7
TROUBLESHOO
TING AND
MAINTENANCE.'
TROUSLESHOO,
TING AND '
MAINTENANOE.Iz
SHUT DOWN OF VAPOR A- C-051i
RECOVERY UNIT
NECESSARY TO
PERFORM
TROUBLESHOOTING
AND MAINTENANCE.
AWAITING MAINTENANCE
TO DISCOVER
PROBLEM. WILL
RETURN EQUIPMENT TO
NORMAL OPERATIONS
AS SOON AS POSSIBLE.'
SHUT DOWN OF VAPOR ACOS1
RECOVERY UNIT
NECESSARY TO
PERFORM
TROUBLESHOOTING
AND MAINTENANCE.
EQUIPMENT WILL SE
RETURNED TO NORMAL.
OPERATIONS AS SOON
AS POSSIBLE!
SHUT DOWN OF VAPOR A- 0-051
RECOVERY UNIT
NECESSARY TO
PERFORM
TROUBLESHOOTING
AND MAINTENANCE.
UNIT TORE OUT AND
SENT TO SHOP FOR
REPAIRS. EQUIPMENT
WILL BE RETURNED TO
NORMAL OPERATIONS
AS SOON AS POSSIBLE.'
Chevron
R IO
05107/2007 12:01 AM 05/07/2007 11;59 PM
29 N FREE WATER KNOCK
OUT VAPOR
RECOVERY UNIT
SHUT DOWN DUE TO
MECHANICAL
FAILURE. /
0510812007 12.01 AM 05/08/2007 11:59 PM 24 N FREE WATER KNOCK
OUT VAPOR
RECOVERY UNIT
SHUT DOWN DUE TO
MECHANICAL
FAILURE./
ANNA PLATFORM Continued
Page 2 of 10
OPERATIONAL
OPERATIONAL
Excess Flare Report
Month: May Year: 2007
Begin
Date a Time
End
Event Gas
MCF Planned Description of Incident Category
Reason
Steps Taken to
Minimize
Reoccurrence
Actions Taken
Equipmen
Down OP-
UNSCHEDULED
MAINTENANCE
UNSCHEDULED
MAINTENANCE
TROUBLESHOO
TING AND
MAINTENANCE./
TROUBLESHOO
TING AND
MAINTENANCE./
A-C 051i
SHUT DOWN OF VAPOR
RECOVERY UNIT
NECESSARY TO
PERFORM
TROUBLESHOOTING
AND MAINTENANCE.
UNIT TORE OUT AND
SENT TO SHOP FOR
REPAIRS. EQUIPMENT
W ILL BE RETURNED TO
t NORMAL OPERATIONS
AS SOON AS POSSIBLE./
SHUT DOWN OF VAPOR AC 051'
RECOVERY UNIT
NECESSARY TO
PERFORM
TROUBLESHOOTING
AND MAINTENANCE.
UNIT TORE OUT AND
SENT TO SHOP FOR
REPAIRS. EQUIPMENT
WILL BE RETURNED TO
NORMAL OPERATIONS
AS SOON AS POSSIBLE./
Ch evron
ANNA PLATFORM Continued
Excess Flare Report
Month: May Year 2007
Begin
Date 8 Time
End
Event Gas
MCF Planned Description of Incident
Reason
Steps Taken to
Minimize
Reoccurrence
Actions Taken
Equipmen
Dawn MP -.
05/09/2007 12:01 AM 05/09/2007 11:59 PM
Category
29 N. „ FREE WATER KNOCK . OPERATIONAL _ UNSCHEDULED ;--,-
OUT VAPOR r • � -� : = 7 MAINTENANCE,
RECOVERY UNIT • - ` "< -
TROUBLESHtxI.
TING AND
MAINTENANCE.'"
SHUT DOWN DUE TO
MECHANICAL : - - ` =';; - #;... •.
- FAILURE",;,
05/10/2007 1291 AM 05/10/2007 11:59 PM 29 N FREE WATER KNOCK OPERATIONAL
OUT VAPOR
RECOVERY UNIT
SHUT DOWN DUE TO
MECHANICAL
FAILURE.'
Page 3 of 10
UNSCHEDULED TROUBLESHOO
MAINTENANCE TING AND
MAINTENANCE./
SHUT DOWN OF VAPOR .... A-C-051'
RECOVERY. UNIT '
NECESSARY TO '.
PERFORM
TROUBLESHOOTING
AND MAINTENANCE.
UNIT TORE OUT AND
SENT TO SHOP FOR
REPAIRS. EQUIPMENT
MALL BE RETURNED TO
NORMAL OPERATIONS
AS SOON AS POSSIBLE.
SHUT DOWN OF VAPOR A - C - 051i
RECOVERY UNIT
NECESSARY TO
PERFORM
TROUBLESHOOTING
AND MAINTENANCE.
UNIT TORE OUT AND
SENT TO SHOP FOR
REPAIRS. EQUIPMENT
VWLL BE RETURNED TO
NORMAL OPERATIONS
AS SOON AS POSSIBLE.'
Chevron
Nero
05111/2007 12.01 AM 05111/2007 11:59 PM
05112/2007 12:01 AM 05/12/200711:59 PM
29 .
ANNA PLATFORM Continued
, FREE WATER KNOCK
OUT VAPOR '-
RECOVERY UNIT
SHUT GOWN DUE TO
MECHANICAL '
FAILURE.) •
FREE WATER KNOCK
OUT VAPOR
RECOVERY UNIT
SHUT DOWN DUE TO
MECHANICAL
FAILURE.)
Page 4 of 10
Excess Flare Report
Month: May Year. 2007
Begin
Date & Time
End
Event Gas
MCF planned
Description of Incident
Category
Reason
Steps Taken to
Minimize
Reoccurrence
Actions Taken
Equipmen
Down MP-
OPERATIONAL UNSCHEDULED
yY MAINTENANCE
w ) iii
YP r -
OPERATIONAL UNSCHEDULED
MAINTENANCE
TROUBLESHOOT
TING AND ,
MAINTENANCE. /!*!
TROUBLESHOO
TING AND
MAINTENANCE./
SHUT DOWN OF VAPOR A- 0.0511
RECOVERY UNIT ...
NECESSARY TO
PERFORM
TROUBLESHOOTING
AND MAINTENANCE.
UNIT TORE OUT AND
SENT TO SHOP FOR
REPAIRS. EQUIPMENT
WILL BE RETURNED TO
NORMAL OPERATIONS
AS SOON M POSSIBLE.) .
SHUT DOWN OF VAPOR A-C-0Sh
RECOVERY UNIT
NECESSARY TO
PERFORM
TROUBLESHOOTING
AND MAINTENANCE.
UNIT TORE OUT AND
SENT TO SHOP FOR
REPAIRS. EQUIPMENT
WILL BE RETURNED TO
NORMAL OPERATIONS
AS SOON AS POSSIBLE./
Chevron
ANNA PLATFORM Continued
Date IL Time
Begin End
Event Gas
MCP Planned Description of Incident Category
Reason
Steps Taken to
Minimize
Reoccurrence
Actions Taken
Equipmen
Down MP-
05/132007 1201 AM 05/13/2007 11:59 PM
29
FREE WATER KNOCK r
OUT VAPOR
RECOVERY UNIT
SHUT DOWN DUE TO
FAILURE.'
r. i + -'
05/142007 12:01 AM 05/14/2007 11 X59 PM 28 N FREE WATER KNOCK OPERATIONAL
OUT VAPOR
RECOVERY UNIT
SHUT DOWN DUE TO
MECHANICAL
FAILURE./
Page 5 of 10
Excess Flare Report
Month: May Year 2007
OPERATIONAL, UNSCHEDULED - -, TROUBLESHOO.
MAINTENANCE -y :TING AND
Y -� r MAINTENANCE4,
UNSCHEDULED TROUBLSHOO
TING AND
MAINTENANCE.'
MAINTENANCE
UT DOWN OF VAPOR AC•511
RECOVERY UNIT
NECESSARY TO..
PERFORM
TROUBLESHOOTING
AND MAINTENANCE.
UNIT TORE OUT AND
SENT TO SHOP FOR
REPAIRS. EQUIPMENT
WILL BE RETURNED TO
NORMAL OPERATIONS
AS SOON AS POSSIBLE.'
SHUT DOWN OF VAPOR AC -054
RECOVERY UNIT
NECESSARY TO
PERFORM
TROUBLESHOOTING
AND MAINTENANCE.
UNIT TORE OUT AND
SENT TO SHOP FOR
REPAIRS. EQUIPMENT
WILL BE RETURNED TO
NORMAL OPERATIONS
AS SOON AS POSSIBLE.'
Chevron
ROO
IWO
Begin
Date & Time
End
Event Gas
MCF Planned Desciiptlon of Incident
Category
Reason
Steps Taken to
Minimize
Reoccurrence
Actions Taken
EquipMen
Down MP-
05/15/2007 12.01 A61 05/15/2007 11:59 PM
28
0511612007 12:01 AM 05116/2007 11:59 PM 28 N FREE WATER KNOCK
OUT VAPOR
RECOVERY UNR
SHUT GOWN DUE TO
MECHANICAL
FAILURE.'
ANNA PLATFORM Continued
FREE WATER KNOCK-„.. OPERATIONAL UNSCHEDULED
OUT VAPOR t.. .:.� .. _. MAINTENANCE
RECOVERY UNIT -
SHUT DOWN DUE TO
MECHANICAL c �.__. '!r
FAILURE.' _ ..
Page 6 of 10
Excess Flare Report
OPERATIONAL UNSCHEDULED
MAINTENANCE
Month: May Year: 2007
TROUBLESHOO
TING AND '
MAINTENANCE.'
n52••.. -� -
' A
TROURLESHOO
TING AND
MAINTENANCE.'
SHUT DOWN OF VAPOR
RECOVERY UNIT ,.
NECESSARY TO
PERFORM
TROUBLESHOOTING
AND MAINTENANCE.
UNIT TORE OUT AND
SENT TO SHOP FOR
REPAIRS. EQUIPMENT
VMLL BE RETURNED TO
NORMAI. OPERATIONS
AS SOON AS POSSIBLE.'
SHUT DOWN OF VAPOR A -C-061
RECOVERY UNIT
NECESSARY TO
PERFORM
TROUBLESHOOTING
AND MAINTENANCE.
UNIT TORE CUT AND
SENT TO SHOP FOR
REPAIRS. EQUIPMENT
WILL BE RETURNED TO
NORMAL OPERATIONS
AS SOON AS POSSIBLE.'
•
A -C-05U
Chevron
05/17/2007 12:01 AM 05/17/2007 11:59 PM
28
05/18/2007 12:01 AM 05/18/2007 11:59 PM 29 N FREE WATER KNOCK
OUT VAPOR
RECOVERY UNIT
SHUT DOWN DUE TO
MECHANICAL
FAILURE'
ANNA PLATFORM Continued
Page 7 of 10
Excess Flare Report
Begin
Date 8 Time
End
Event Gas
MCF Planned Description of Incident
Category
Reason
Steps Taken to
Minimize
Reoccurrence
Actions Taken
Equiprnen
Down MP-
N FREE WATER KNOCK OPERATIONAL_. UNSCHEDULED
OUT VAPOR _ MAINTENANC&.
RECOVERY UNIT
SHUT DOWN DUE TO
MECHANICAL-
. 'tea• _. -
OPERATIONAL UNSCHEDULED
Month: May Year: 2007
TROUBLESHOO
T1NG AND
MAINTENANCE.'
TROUBLESHOO
MAINTENANCE TING AND
MAINTENANCE.'
SHUT DOWN OF VAPOR A-C 051.
RECOVERY UNIT
NECESSARY TO
PERFORM
TROUBLESHOOTING
r . AND MAINTENANCE.
ti1.' UNIT TORE OUT AND SENT TO SHOP FOR
REPAIRS. EQUIPMENT ..
WILL BE RETURNED TO
NORMAL OPERATIONS
AS SOON AS POSSIBLE.'
SHUT DOWN OF VAPOR A -C-051'
RECOVERY UNIT
NECESSARY TO
PERFORM
TROUBLESHOOTING
AND MAINTENANCE.
UNIT TORE OUT AND
SENT TO SHOP FOR
REPAIRS. EOUIPMENT
WILL BE RETURNED TO
NORMAL OPERATIONS
AS SOON AS POSSIBLE.'
Chevron I WO
Begin
Date d Time
End
Event Gas
MCF Planned Description of Incident
Category
Reason
Steps Taken to
Minimize
Reoccurrence
Actions Taken
Equiprnen
Down MP-
05/19/2007 12:00 AM 05/19/2007 11:59 PM
27
ANNA PLATFORM Continued
FREE WATER KNOCK OPERATIONAL
OUT VAPOR Ai ...
RECOVERY UNIT
SHUT DOWN DUE TO
MECHANICAL -
FAILURE".
05/20/2007 12:01 AM 05/20/2007 11 59 PM 20 N FREE WATER KNOCK
OUT VAPOR
RECOVERY UNIT
SHUT DOWN DUE TO
MECHANICAL
FAILURE./ FWKNVRU
Repaired and bade on
One.
Page 8 of 10
OPERATIONAL
Excess Flare Report
Month: May Year 2007
UNSCHEDULED
MAINTENANCE
UNSCHEDULED
MAINTENANCE
TROUBLESHOO., .
TING AND
MAINTENANCE.(4 :
REPLACED
ROTOR
BEARINGS.'
SHUT DOWN OF VAPOR A-C-051i
RECOVERY UNIT -
NECESSARY TO
PERFORM
TROUBLESHOOTING
AND MAINTENANCE.
UNIT TORE OUT AND
SENT TO SHOP FOR
REPAIRS. EQUIPMENT
WILL BE RETURNED TO
NORMAL OPERATIONS
AS SOON AS POSSIBLE.'
SHUT DOWN OF VAPOR
RECOVERY UNIT
NECESSARY TO
PERFORM
TROUBLESHOOTING
AND MAINTENANCE.
ROTOR BEARINGS
WERE REPLACED AND
SENT BACK TO
PLATFORM. EQUIPMENT
WAS PLACED BACK INTO
SERVICE./
AC -0511
Form 10-422 Rev. 2/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
5. Month/Um of Disposition
1. Facility Number
1330000005
2. Facility Name
ANNA PLATFORM
ONpoaltbn
6. S010
7. Reinjected
8. Flared or vented 1 how or less
9. Flared or vented mare than 1 haw (see InMI' )
10. Pilot and Purge
11. Used for base operations (specify In Remarks)
12. Other (see instructions)
13. TOTAL VOLUME (ITEMS a- 1RECEIVEL7
14. NGL Gas Equivalent
JUL 2 3 2np7
17. Transferred to: (Express as e negative e)
18. Remarks:
Transferred From: Bruce Platform
Transferred To: GPTF -LEX
GPTF -AB
Bruce Platform
3. Field
GRANITE POINT
Volut* MCF
0
0
0
210
21,686
0
22.096
0
0
0
(6,274)
(4,067)
(2207)
0
4. Operator
UNOCAL ALASKA
20. For production from multiple pools. lest conbPoutlon of each Peeler • Want d
TOWN Vdh/ma.
0
Pool Name
18742
Waste:
Commissioner
I hereby certify that the foregoing is true and cad to the best of my knowledge.
rn ., .--
Printed Name Mary YgMar
Signature
Title Production Accountant
Phone 7134324238 Date July 16, 2007
June -07
Pod Code
280150
Authorization >1 hr:
Safety
Leese Use
Conservation
MCF
MCF
MCF
Date
Percent
100.00%
MCF
Note: All volumes must be corrected
to pressure of 14.65 psis and to a
temperature of 600 F. Authority 20
AAC25.235.
INSTRUCTIONS ON REVERSE SIDE
Submit In Dupllnte
1. Facility Number
1330000005
2. Facility Name
ANNA PLATFORM
. Field
GRANITE POINT
4. Operator
UNOCAL ALA$KA
5, Month Year of Disposition
July-07
Disposition
Volume MCF
1 ` \
20. For production hem mWOple pools, Mat contribution of each pool as • percent of
Tow Vokma.
8. Sold
0
Pool Name
Pool Coda
Percent
7. Reinjected
0
18742
280150
100.00%
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see Instr.)
2,048
10. Pilot and Purge
218
11. Used for lease operations (specify in Remarks)
23,663
12. Other (see instructions)
0
Authorization v1 hr.
Safety
u1
ZrO r+
MCF
.,
13. TOTAL VOLUME (ITEMS 8.12)
25,929
Lease the
MCF
14. NGL Gas Equivalent
0
Conservation
MCF
15. Purchased gas
4,437
Waste:
MCF
18. Transferred from:
o
114,-;4!
/J
� ?6'— 9 //- 0 7
17. Transferred to: (Express as a negative e)
(4,105)
CannSaioner Date
15. Remarks:
Transferred From: Bruce Platform
Transferred To: GPTF -LEX
GPTF -AB
Bruce Platform
0
(2,497)
(1,805)
0
I hereby certify that the foregoing is true and correct to the best of my knowledge.
/� //
Signature p 2H 1 �[SL /�. tC. rasa
Production Accountant
Not: All volumes must be corroded
Note:
pressure of 14.65 psis end to a
temperature of 60o F. Authority 20
AAC25.235.
t /
Printed Name Mary Indlhar Phone
7134324238 Date August 13, 2007
Form 10-422 Rev. 2/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
' REPORT I = PRODUCED GAS DISPOSITION
INSTRUCTIONS ON REVERSE SIDE
Subml In Duplicate
two
Dale 8 Time
End
Event Gas
MCF Plannc d Doscnption oI Inc de nl Category
Reason
Sl T.ikcn to
M1L a nni:,
Re nec urrence
Actions Takeo
Eguipmen
Down MP -' .
Begin
07106/2007 04A5 AM 0710612007 11.59 PM 44
0 7107 /2 0 07 12:00 AM 07/072007 11:69 PM - 61
4.
07/06/2007 12:00 AM 07/062001 11:59 PM 54
N FREEWATER
KNOCKOUT VAPOR
RECOVERY UNIT
SHUT DOWN DUE TO
MECHANICAL
FAILURE, RESULTING
IN FXCESS FLARING.'
F,REEWATER"
.INbCIST VAPQRK
RECOVERY UNIT
='SHUT DOWN DUE TO .
MECHANICAL
• EAI1yRE, RESULTINg
IN .. eas.FLARING.' a -
FREEWATER
KNOCKOUT VAPOR
RECOVERY UNIT
SHUT DOWN DUE TO
MECHANICAL
FAILURE, RESULTING
IN EXCESS FLARING.'
ANNA PLATFORM
OPERATIONAL
Page 1 of 8
oPwIj/1
OPERATIONAL
07109/200712:00 AM. 07109/200711 59 PM R f 81 % r N „ FREE - ofERA, TIO.1y*
it Y i S T • : KNOCKOUTUAPORt4 ' = -?
.. RECOVERY UNIT •.
C.. SHUT DOWN OUEla
1 MECHAN C $
FAILURE, RESULTING
IN EXCESS FLAINN61 ;_
Excess Flare Report
Montle July YMr. 2007
UNSCHEDULED
MAINTENANCE
u+� b�t•1e
UNSCHEDULED
MAINTENANCE
TROUBLESHOO
TING AND
REPAIRS.'
TROUSLESHOO
TING AND
REPAIRS.'
SHUT DOWN OF VAPOR A•G451'
RECOVERY UNIT
NECESSARY TO
PERFORM
TROUBLESHOOTING
AND REPAIRS. UNABLE
TO FIX PROBLEM, SENT
TO SHOP FOR REPAIRS.'
aII f T 4OW N OF VAPOR *4-061
RY UNIT
CESSARYTO
PERFORM
*OVERSHOOTING
MO REPAIRS. UNABLE
x -- T9 KIX PROBLEM, sea
TO SHOP FORREPMRS.I
SHUT DOWN OF VAPOR AC-051
RECOVERY UNIT
NECESSARY TO
PERFORM
TROUBLESHOOTING
AND REPAIRS. UNABLE
TO FIX PROBLEM, SENT
TO SHOP FOR REPAIRS.'
• $}{t1T DOWNOP VAPOR
RECOVERY UNR
UESSAR YTO
p kRR FORM
TROUOLBSHOO:ANb
AP1D REPAI tL UNABLE ..
tTO POEPR0eLEM, SENT
}O' SHOP FO!!l:NEPAIRB.I'.
A'CASL
ther"
Date S. Iinm
End
Event Gan
MCF Plannc - d Dos ri ntmn of Inadent Categorl
P,ra,on
St. yt T.,',..n to
Minimize
Ronrcurrenr
Acn .n- Talon
Eguittnen.
Doan LIP-
07/10/2007 1200 AM 07/1012007 11:59 PM
. 07/111200712:00 AM: 07/11/2007 11:59 PM'....,:. 1
07/12/200712.00 AM 07112/2007 11:59 PM
88
N
206
ANNA PLATFORM Continued
FREEWATER
KNOCKOUT VAPOR
RECOVERY UNIT
SHUT DOWN DUE TO
MECHANICAL
FAILURE, RESULTING
IN EXCESS FLARING.'
" ktErta41.4 OPERAnO
OutVAPO[R
'tv UNf' .
n WW Dug 19 ,``
MECHANICAL ...., -
PA¢URE, RESULTING , : : <y
IN FRGF F'.A81NO'.' =E=
mow } i .. •
FREEWATER
KNOCKOUT VAPOR
RECOVERY UNIT
SHUT DOWN DUE TO
MECHANICAL
FAILURE, RESULTING
IN EXCESS RARING.'
Page 2 of 8
OPERATIONAL
Excess Flare Report
Month: July Year, 2007
OPERATIONAL UNSCHEDULED TROUBLESHOO
MAN TENANCE TING AND
REPAIt8.'
UNSCHEDULED
MAINTENANCE
TROUBLESHOO
TING AND
REPAIRS.'
SHUT DOWN OF VAPOR AC-0514
RECOVERY UNIT
NECESSARY TO
PERFORM
TROUBLESHOOTING
AND REPAIRS. UNABLE
TO FIX PROBLEM, SENT
TO SHOP FOR REPAIRS.'
tlttAlve P YAPORt ` ::
/41Ni ka
frr TO.
SM:
esei !HOOTING:
WETS NEW
INO. WAITING
fi'f7 PARTS TO BE
(RIPPED.'
SHUT DOWN OF VAPOR A-C-061'
RECOVERY UNIT
NECESSARY TO
PERFORM
TROUBLESHOOTING
AND REPAIRS.
BEARINGS NEED
REPLACING. WAITING
ON PARTS TO BE
SHIPPED.'
Area-0611
ANNA PLATFORM Continued
Begin
Dale 8 Tillie
1ycnt Gas
MCF PI.anno BesC,nptton of InCUle,rt Category
Str_p°. ta to
Mimnn:
Reuccn Actnm_ Rilen
a-
Egtiipmmn
Dorn MP.
OYl131200712:00
11 :9
07/14/2007 12:00 AM 07/14/2007 11:59 PM 191 N FREEWATER OPERATIONAL UNSCHEDULED
KNOCKOUT VAPOR MAINTENANCE
RECOVERY UNIT
SHUT DOWN DUE TO
MECHANICAL
FAILURE, RESULTING
IN EXCESS FLARING.,
07115/200712:00 AM 07/15/200711:59 PM: 212 a: N'T' FREEWATER ' , OPERA
NiO VAP9RE
�
ethtn D01thI
tHANICAL .
FAN.URE; RESULTING
IFiE : C.
Page 3 of 8
Excess Flare Report
Month: July Year. 2007
0
*soc i1NGM ;
REpMIIRS.
INQS NEED
ING, WAITING
ART9109 ..
TROUBLESHOO SHUT DOWN OF VAPOR
TWO AND RECOVERY UNIT
REPAIRS., NECESSARY TO
PERFORM
TROUBLESHOOTING
AND REPAIRS.
BEARINGS NEED
REPLACING, WAn1N0
ON PARTS TO BE
SHIPPED,
DOWN OF VAPOR. N66611
Ma Y
eiegekoOnno
O
WONDS NEED
1NG WAITING
1110fARTS TO 86;
MC-O51.
Begin
Date & Time
End
Event Gas •
M■F Planne d C e r rg,tmn of Inc idcnf Category
Hra
Han< // /lice
Act. .n, T c..n
E
D MP-
07116/2007 1200 AM 07116/2007 11 :59 PM
07/17/2007 12:00 AM 07/17/2007 11:59 PM,- €. 1 _ .
07/1802007 12:00 AM 07/18/2007 11:59 PM 118
204 N FREEWATER
KNOCKOUT VAPOR
RECOVERY UNIT
SHUT DOWN DUE TO
MECHANICAL
FAILURE, RESULTING
IN EXCESS FLARING.'
ANNA PLATFORM Continued
OPERATIONAL UNSCHEDULED
FREEWA7 R . , . t : OP E RA TOONAI;;
KNOCKO'J[ VAPOR
OCOVSUNIT
/Art D0*
MEctUUJICAI. ,` 4 5
FAILURE RESULTING .
ii EXCESS ING I1 .
4
Page 4 of 8
FREEWATER OPERATIONAL
KNOCKOUT VAPOR
RECOVERY UNR
SHUT DOWN DUE TO
MECHANICAL
FAILURE, RESULTING
IN EXCESS FLARING.'
Excess Flare Report
Month: July Year: 2007
MAINTENANCE TANG AND
REPAIRS.'
UNSCHEDULED
MAINTENANCE
TROUBLESHOO
TROUBLESHOO
TING AND
REPAIRS.'
SHUT DOWN OF VAPOR AC-0511
RECOVERY UNIT
NECESSARY TO
PERFORM
TROUBLESHOOTING
ANO REPAIRS.
BEARINGS NEED
REPLACING, WAITING
ON PARTS TO BE
SHIPPED.'
Et daMticr VAPOR
OJERYkM�IT 1 .�,,,
OSAROP.:4,.._
A<5051
ems, WAITING
P TO BE
PPED.I •
SMUT DOWN OF VAPOR AC-051I
RECOVERY UNIT
NECESSARY TO
PERFORM
TROUBLESHOOTING
AND REPAIRS.
BEARINGS NEED
REPLACING, WAITING
ON PARTS TO BE
SHIPPED.'
0720/200712:00 AM 0720/2007 11:59 PM
0721200712:00 AM 0721200711:50 PM 149 d':7"' N
83 N FREEWATER
KNOCKOUT VAPOR
RECOVERY UNIT
SHUT DOWN DUE TO
MECHANICAL
FAILURE, RESULTING
IN EXCESS FLARING./
FREEWAI
/c4“.2. acy
ANNA PLATFORM Continued
Begin
Date & Time
Evert? Gas
MCF Planned
Desc+rphon of Incident
Category Reason
' f11 t i1. .
Steins Tiu 010
Huron C,
Reoccurtmrce
EQJLpnlrn
Down MP.
9200712:00 AM
OPERATIONAL UNSCHEDULED
QPERATIONAI:•+Na'
VAFGR
Page 5 of S
Excess Flare Report
Month: July Year. 2007
TROUBLES:100
MAINTENANCE TING AND
REPAIRS.,
AJ ;(b14.7
ACE
AM. nn.14 n
� PA& UNIT
;1 VisARY. Tb ; _.
SHOOT** ..
REPAIRS
arReED
WRITING
PARTS TO BB
SHUT DOWN OF VAPOR MC-0S11
RECOVERY LINK
NECESSARY TO
PERFORM
TROUBLESHOOTING
ANO REPAIRS.
BEARINGS NEED
REPLACING. WAITING
ON PARTS TO BE
SHIPPED.,
OF VAPOR Arerstil'
t. .'toll ,..
- 9
ULE6
t , 445 AND
E au
NQRMAL
S AS.SQAN:.:^ •
11 -.r.;
1. Faceay Number
1330000005
2. Facility Name
ANNA PLATFORM
3. Field
GRANITE POINT
4. Operator
UNOCAL ALASKA
5. Month/Year of Difpoailten
August -07
Disposition
Volume MCF
20. Forproduction from muNl#d ► pools, fiat contributes? of Imo pool as a more of
Toed Volume
e. Sold
0
Pool Name
Pool Code
Percent
7. Reinjected
0
18742
280150
100 .^
8. Flared or vented 1 hour or leas
0
9. Flared or vented more than 1 hour (sae instil
0
10. Plot and Purge
217
11. Used for lope operations (specify In Remarks)
30,387
Authorisation >1 hr.
Safety
MCF
12. Other (see Instructions)
D
13. TOTAL VOLUME (ITEMS 0.12)
30,604
Lease Use
14. NGL Gas EpuNalent
0
Conservation
MCF
15. Purchased gas
0
Waste:
MCF
15. Tranlaned from:
0
17. Transferred to (Express as a negative #
(7,105)
Commissioner Date
18. Remarks:
Tms/Nred From: Brum Platform 0
Transferred To: OPTF.LEX (5,049)
GPTP.AB (2.058)
Bruce Platform 0
1 hereby certify that the foregoing is Ira and correct to the best of my knowledge.
Signature Title Production Accountant
Nob: All volumes must be corroded
to pressure of 14.65 psis and to it
temperature of 60o F. Authority 20
AAC25.235.
Printed Nana Mary lndlhsr Phone 7134324238 Oats September 14, 2007
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Form 10-422 Rev. 2/2004
INSTRUCTIONS ON REVERSE SIDE
Submk In Dupeate
Form 10-422 Rev. 2/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
5. MonthNear of Disposition
1. Facility Number
1330000005
Disposition
8. Sold
7. Retracted
8. Flared or vented 1 hour or less
9. Flared or vented more than 1 hour (see Instr.)
10. Pilot and Purge
11. Used for base operations (specify Si Remarks)
12. Other (see instructions)
13. TOTAL VOLUME (REMS 6 -12)
14. NGL Gas Equivalent
15. Purchased gas
16. Transferred from:
17. Transferred to: (Express as • negative e)
18. Remarks:
Transferred From: Bruce Platform
2. Facility Name
ANNA PLATFORM
3. Feld
GRANITE POINT
Volume MCF
0
0
0
3,244
210
24,650
0
28,104
0
3,882
0
(4,418)
Pool Name Pool Code Patent
280150 100.00%
0
Translated To: GPfF -LEX (3,693)
GPfF-AB (723)
Bruce Platform 0
4. Operator
UNOCAL ALASKA
20. For production from multiple pools, list contribution of each pool as • mount of
Total Volume
18742
Authorvatbn >1 hr: MCF
Seery 3 z44
Lease Use
Conservation
MCF
MCF
Waste:
Commissioner
I hereby certify that the foregoing is true and correct to the best of my knowledge.
cyll/742
Printed Name Mary Indihar
Signature
Title Production Accountant
Plane 7134324238 Data October 17, 2007
September -07
MCF
nu
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
Chevron
IMO
09/12/2007 10:30 AM 09/12/2007 11:59 PM
09/13/2007 12:01 AM
09/142007 12'.01 AM
09/15/2007 12:01 AM
09/182007 12:01 AM
09/172007 12:00 AM
09/182007 12:01 AM
09/19/2007 12:01 AM
09/20/2007 1201 AM
09/21/2007 12:01 AM
09/22/2007 12:01 AM
0923/200712:01 AM
09/24/2007 12:01 AM
09/252007 12:01 AM
\ 09282007 12:01 AM
09272007 12:01 AM
09282007 12:01 AM
24 N
09/13/2007 1 1:59 PM . 123 N ._
09/14/2007 11:59 PM 119 N
09/152007 11:59 PM 124 N-
09/18/2007 11:59 PM 129 N
09/17/2007 11:59 PM 167 N
09/18/2007 11:59 PM 166 N
09/19/2007 11:59 PM 170 N
09/20/2007 11:59 PM 255 N
09/21/2007 11:59 PM 189 N
09222007 11:59 PM 170 N
0923/200711:59 PM 178 N
09242007 11:59 PM 181 N
09252007 11:59 PM 182 N ,
09/26/2007 1159 PM 185 N
09272007 11:59 PM 149 Y
09/28/2007 11:59 PM 266 Y
FWKO VRU HIGH
VIBRATION. suspect
bad bearing.
FWKO VRU DOWN.
FOR REPAIRS.
FWKO DOWN
Fwko tau Down
FWKO went down high
vibration.
FWKO VRU down for
repairs/replacement
FWKO VRU down on
high vibration
FWKO VRU Down high
NbratiOn
FNMO VRU down high
wbratiOn
FNIKO VRU down high
vibration
FWKO VRU down high
vibration
FWKO VRU down due
to high Vibration
FWKO High vibration
FWKO VRU down due
to high vibration
due to high vibration on
FWKO VRU
high vibration
high vibration
ANNA PLATFORM
Page 1 of 5
OPERATIONAL
OPERATIONAL
OPERATIONAL
OPERATIONAL
OPERATIONAL:.•
OPERATIONAL
OPERATIONAL
OPERATIONAL
OPERATIONAL
OPERATIONAL
OPERATIONAL
OPERATIONAL
OPERATIONAL
T
OPERATIONAL
OPERATIONAL.
OPERATIONAL
Excess Flare Report
Month: September Year. 2007
Begin
Date & Time
End
Event Gas
MCF Planned Description of Incident
Category
Reason
Steps Taken to
Minimize
Reoccurrence
Actions T
Equipmem
Down MP-
•
OPERATIONAL UNSCHEDULED
MAINTENANCE
UNSCHEDULED
MAINTENANCE
UNSCHEDULED
MAINTENANCE
UNSCHEDULED
MAINTENANCE
UNSCHEDULED
MAINTENANCE
UNSCHEDULED
MAINTENANCE
UNSCHEDULED
MAINTENANCE
UNSCHEDULED
MAINTENANCE
UNSCHEDULED
MAINTENANCE
UNSCHEDULED
MAINTENANCE
UNSCHEDULED
MAINTENANCE
UNSCHEDULED
UNSCHEDULED
MAINTENANCE
UNSCHEDULED
MAINTENANCE
UNSCHEDULED
MAINTENANCE
UNSCHEDULED
MAINTENANCE
UNSCHEDULED
MAINTENANCE
shut down for
repairs.
shut down vn1's
AC-051'
AC-051i
Down for repairs SHUT DOWN FWKO VRU AC-051r
Awaiting repairs.
Shut Down.
Make repairs to SID Evoke AC-0518
Fuko wU.
repair Nato wu. shut down hero vim. A1}0511
repaidreplece re- akhaplace AC
Repair/Replace Repair/Replace AC
Repair/Replace Repair/Replace AC
repair /replace Repair/Replace AC .
repai/roplace repair/replace AC-051r
repair/replace repair/replace AC -0519
repeirheplece - repaidreplace A -C-051r
repair/replace repairrleplace AC-0511
replace/repair replace/repair AC -061/
replace/rspar replaosfapatr AC
replace , replace AC-051
replace
rice
A- Cr051i
Chevron
Begin End
09/29/2007 11:59 PM - 235 V_. high vibration
09/30/2007 12:01 AM 09/30/2007 11:59 PM 252 Y high vexation
. 09/29/2007 12:01 AM
got. 3 a 44
ANNA PLATFORM Continued
Dale 8 Time Event Gas
Steps Taken to
Minim 10
Reoccurrence
•
Actions Taken
Equipment
Down MP..
MCF Planned Description of Incident Category Reason
OPERATIONl1LR, $Cf7EDULED
MAINTENANCE
OPERATIONAL UNSCHEDULED
MAINTENANCE
'711Th ' o /!& /07
Page 2of5
Excess Flare Report
Month: September Ynr: 2007
replace
replace
1. Facility Number
1330000005
2. Facility Name
ANNA PLATFORM
3. Field
GRANITE POINT
4. Operator
UNOCAL ALASKA
5. MontNyear of Disposition
October - 07
Disposition
Volume MCF
1
20. Forproducfion from mulele pools. fist wnbibulion of each pool es a percent of
Total Volume.
e Sold
0
Pool Name
Pool Code
Percent
7. Reinjected
0
18742
280150
100.00%
8. Flared or vented 1 hour or less
0
9 Flared or vented more than 1 hour (see instr.)
18,864
10. Pilot and Purge
217
11. Used for base operations (specify In Remarks)
4,801
Authorization >1 tv.
Sa1My
o II�
(Di `ct�
MCF
12. Other (see instructions)
0
13. TOTAL VOLUME (ITEMS 6
23,882
Leas Use
MCF
14. NGL Gas Equivalent
0
Conservation
MCF
15. Purchased gas
17,939
waste:
MCF
18. Transferred from:
o
l - /i
/ � o
17. Transferred to: (Express as a negative e)
(102)
Commissioner
18. Remarks:
Transferred From: Bruce Platform
Transferred To: GPTF -LEX
GPTF -AB
Bruce Platform
0
0
(102)
0
I hereby certify that the foregoing is true and correct to the best of my knowledge.
W 1 .�1,,
Signature , , 1 73 Title
Production Accountant
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.
Printed Name Mary I ndihar Phone
713 - 4324236 Date November 12, 2007
Form 10-422 Rev. 2/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
INSTRUCTIONS ON REVERSE SIDE
Submit In Duplicate
Date & Time
Event Gas
MOE
Planned?
Description of Incident
Category
Reason
Actions Taken
Steps Taken to
Minimize ReCurnene'
Equipment Down
MP-2 ID Number
Begin
End
101200] 0 01
lOnt2007 2359
N
FREE WATER KNOCK OUT AND
TANK VAPOR RECOVERY UNITE
LEFT SMUT DOWN AFTER
MECHANICAL FAILURE FOR
PLANNED GAS COMPRESSOR
REPLACEMENT, RESULTING IN
EXCESS FLARING]
OPERATIONAL
UNSCHEDULED MAINTENANCE
SMUT DOWN OF VAPOR
RECOVERY UNITS AND OAS
COMPRESSORS NECESSARY
TO PERFORM MAINTENANCE
AND REPLACE WrIN NEW OAS
COMPRESSOR. EQUIPMENT ro
RETURNED TO NORMAL
OPERATIONS AS SOON A8
REPLACING GAS
COMPRESSOR.'
A40610
1022007 0 01
1001200? n 59
N
FREE WATER KNOCK OUT AND
TANK VAPOR RECOVERY UNITS
LEFT SHUT DOWN AFTER
MECHANICAL FAILURE FOR
PLANNED OAS COMPRESSOR
REPLACEMENT, RESULTING IN
EXCESS FLARING]
OPERATIONAL
UNSCHEDULED MAINTENANCE
SMUT DOWN OF VAPOR
RECOVERY UNITS AND GAS
COMPRESSORS NECESSARY
TO PERFORM MAINTENANCE
AND REPLACE WITH NEW GAS
COMPRESSOR. EQUIPMENT TO
REPLACING GAS
COMPRESSOR]
A4-0610
RETURNED TO NORMAL
OPERATIONS AS SOON AS
10/3/2007 0:01
101/200723:59
N
FREE WATER KNOCK OUT AND
TANK VAPOR RECOVERY UNITS
LEFT SNIFF DOWN AFTER
MECHANICAL FAILURE FOR
PLANNED GAS COMPRESSOR
REPLACEMENT, RESULTING IN
EXCESS FLARNO4
OPERATIONAL
UNSCHEDULED MAINTENANCE
SHUTDOWN OF VAPOR
RECOVERY UNITS AND GAS
COMPRESSORS NECESSARY
TO PERFORM MAINTENANCE
AND REPLACE WITH NEW GAS
COMPRESSOR. BEGAN DEMO
OF OLD VRU COMPRESSOR.
EQUIPMENT TO BE RETURNED
•^
GAS COMPRESSOR
NC -0610
REPLACEMENT PROJECT.'
/0142007 DOI
SOIV2007 23:59
310
N
FREE WATER KNOCK OUT ARID
TANK VAPOR RECOVERY UNITS
LEFT SHUT DOWN AFTER
MECHANICAL FAKIJRE FOR
PLANED GAS COMPRESSOR
REPLACEMENT. RESULTING IN
EXCESS FLARING]
OPERATIONAL
UNSCHEDULED MAINTENANCE
SHUT DOWN OF VAPOR
RECOVERY UNITS AND GAB
COMPRESSORS NECESSARY
TO PERFORM MAINTENANCE
AND REPLACE WITH NEW GAS
COMPRESSOR. DEMOLITION
OF OLD VAPOR RECOVERY
UNIT COMPRESSOR.
... ��
GAS COMPRESSOR
REPLACEMENT PROJECT.'
AC-0610
10/52007 0
1 23.50
A
N
FREE WATER 104OCK OUT AND
TANK VAPOR RECOVERY LJMTS
LEFT SMUT DOWN AFTER
MECHANICAL FAILURE FOR
PLANNED GAS COMPRESSOR
REPLACEMENT. RESULTING IN
EXCESS FLARING.I
OPERATIONAL
UNSCHEDULED MAINTENANCE
SHUT DOWN OF VAPOR
RECOVERY UNITS AND GAS
COMPRESSORS NECESSARY
TO PERFORM MAINTENANCE
AND REPLACE WITH' NEW GAS
COMPRESSOR. DEMOLTION
OF OLD VAPOR RECOVERY
UNIT COMPRESSOR.
GAS COMPRESSOR
REPLACEMENT PROJECT.'
AC-0610
1GW2007 001
10/12007 23:59
N
FREE WATER KNOCK OUT AND
TANK VAPOR RECOVERY UNITS
LEFT Stan DOWN AFTER
MECHANICAL FNLURE FOR
PLANNED OAS COMPRESSOR
OPERATIONAL
OTHER: SEE DESC OF EVENT
SMUT GOWN OF VAPOR
RECOVERY UNITS AND GAS
COMPRESSORS NECESSARY
TO PERFORM MANTENANCE
AND REPLACE WITH NEW GAS
COMPRESSOR. DEMOLITION
OF OLD VAPOR RECOVERY
UNIT COMPRESSOR.
COMPRESSOR
REPLACEMENT PROJECT]
*4.0610
REPLACEMENT, RESULTING 114
EXCESS FLARING]
Facility Name:
ANNA PLATFORM
Report Date: 11/15/2007
1405> AO-
Excess Flare Log Report
Month/Year:
01-Oct -2007
Page: 1 of 7
Dab & Time
Event Gas
MCF
Planned?
Description of Incident
Category
Reason
Actions Taken
Steps Taken to
Minimize Recurrence
Equipment Down
MP -2 ID Number ,
Begin
End
i0/7/2007 0.01
10n/2W12059
1143
N
FREE WATER KNOCK OUT
VAPOR RECOVERY UMT 8INT
00WN DUE TO NIGH
VIBRATION, RESULTING M
EXCESS FLARING.'
Gee Capemor don E replan
OPERATIONAL
OTHER SEE OESC OF EVENT
31207 DOWN OF VAPOR
RECOVERY UNITS AND OAS
COMPRESSORS NECESSARY
TO PERFORM MAINTENANCE
AND REPLACE WITH NEW GAS
COMPRESSOR. DEMOLITION
OF OLD VAPOR RECOVERY
UMT COMPRESSOR.
�w.
.......-.
OAS COMPRESSOR
AC.0610
REPLACEMENT PROJECT.'
1002007 001
10e/2007 23'59
1115
Y
FREE WATER KNOCK OUT AND
TANK VAPOR RECOVERY UNITS
LEFT SMUT DOWN AFTER
MECHANICAL FAILURE FOR
PLANED COMPRESSOR
REPLACEMENT. RESULTING IN
EXCESS FLARE/134
OPERATIONAL
UNSCHEDULED MAINTENANCE
SHUT DOWN VAPOR
RECOVERY UNITS AND GAS
COMPRESSORS NECESSARY
TO PERFORM MAINTENANCE
N40 REPLACE WITH NEW GAS
COMPRESSOR. DEMOLITION
OF OLD VAPOR RECOVERY
UNIT COMPRESSOR.
- ✓ �
OAS COMPRESSOR
A -C-0610
REPLACEMENT PROJECTJ
10x'2007001
10/91200723:59
1143
Y
FREE WATER KNOCK OUT AND
TANK VAPOR RECOVERY UNITS
LEFT SHUT DOWN AFTER
MECHANICAL FAILURE FOR
PLANNED COMPRESSOR
REPLACEMENT. RESULTING IN
EXCESS FLARING.'
OPERATIONAL
SCHEDULED MAINTENANCE
SHUT DOWN OF VAPOR
RECOVERY UNITS AND GAS
GAS COMPRESSOR
A -C-0510
REPLACEMENT PROJECT.'
COMPRESSORS NECESSARY
TO PERFORM MANNTENANCE
AND REPLACE 1MTN NEW GAS
COMPRESSOR. DEMOLITION
OF 01.0 VAPOR RECOVERY
UNIT COMPRESSOR.
wI„
10 01
1010'200723.59
1143
Y
KNOCK AND
FREE WATER OCK OUT D
TANK VAPOR RECOVERY UNITS
LEF 7 SMUT DOWN AFTER
MECIV WICAL FAILURE FOR
PLANNED COMPRESSOR
REPLACEMENT. RESULTING IN
EXCESS FLARING.'
OPERATIONAL
UNSCHEDULED MAINTENANCE
SHUT DOWN OF VAPOR
RECOVERY UNITS AND GAS
COMPRESSORS NECESSARY
TO PERFORM MAJNTENANCE
AND REPLACE WITH NEW GAS
COMPRESSOR. OEMOLITION
OF OLD VAPOR RECOVERY
UNIT COMPRESSOR
GAS COMPRESSOR
A -C-0610
REPLACEMENT PROJECT.'
101112007 091
10111/2007 23.50
1143
Y
FREE WATER KNOCK OUT AND
TANK VAPOR RECOVERY UNITS
LEFT SHUT DOWN AFTER
MECHANICAL FAILURE FOR
PLANNED COMPRESSOR
REPLACEMENT. RESULTING IN
EXCESS FLARING.1
OPERATIONAL
UNSCHEDULED MAINTENANCE
SHUT GOWN OF VAPOR
RECOVERY UNITS AND GAS
COMPRESSORS NECESSARY
TO PERFORM MANTENANCE
AND REPLACE WITH NEW GAS
COMPRESSOR. OEMOUTION
OF OLD VAPOR RECOVERY
UNIT COMPRESSOR.
w ~ �
GAS COMPRESSOR
REPLACEMENT PROJECT.'
A-C-0310
1012/20070.01
1012/2007 23:50
1143
Y
FREE WATER KNOCK OUT AND
TANK VAPOR RECOVERY UNITS
LEFT SHUT DOWN AFTER
MECHANICAL FAILURE FOR
PLANNED COMPRESSOR
REPLACEMENT, RESULTING IN
EXCESS FLARING.'
OPERATIONAL
UNSOEDULW MAINTENANCE
SHUT DOWN OF VAPOR
RECOVERY UNITS AND OARS
COMPRESSORS NECESSARY
TO PERFORM MANTENANCE
AND REPLACE WITH NEW GAS
COMPRESSOR. DEMOLITION
OF OLD VAPOR RECOVERY
UNIT COMPRESSOR
GAS COMPRESSOR
REPLACEMENT PROJECT.'
A-C-0510
Facility Name:
Report Date: 11/15/2007
ANNA PLATFORM
(29 l AUF
Excess Flare Log Report
Month/Year.
01-Oct-2007
Page: 2 of
Data & Tkns
Event Gas
MCF
Planned?
Descrlpdon of Incident
Category
Reason
Actions Taken
SHUT DOWN OF VAPOR
RECOVERY UNITS AND GAB
COMPRESSORS NECESSARY
TO PERFORM MAINTENANCE
AND REPLACE WITH NEW OAS
COMPRESSOR DE
OF OLD VAPOR RECOVERY
UNIT COMPRESSOR.
'�
Steps Taken to
Minimise Recurtenoe
CAR COMPRESSOR
Equipment Down
MP -2 ID Number
AC-0610
Begin
End
151151007001
151131100723:
1141
Y
FREE WATER KNOCK OUT AND
TANK VAPOR RECOVERY UNITS
LEFT SHUT DOWN AFTER
MECHANICAL FAILURE FOR
PUNNED COMPRESSOR
REPLACEMENT. RESULTING IN
EXCESS FuNING.I
OPERATIONAL
UNSCHEDULED MAINTENANCE
REPLACEMENT PROJECT.'
15114/2001 1
7 23 59
1143
Y
FREE WATER KNOCK OUT AND
TANK VAPOR RECOVERY LINTS
LEFT SHUT DOWN AFTER
MECHANICAL FAILURE FOR
PLANNED COMPRESSOR
REPLACEMENT, RESULTING IN
EXCESS FLARING.'
OPERATIONAL
UNSCHEDULED MAINTENANCE
SHUT DOWN OF VAPOR
RECOVERY UNITS AND OAS
COMPRESSORS NECESSARY
TO PERFORM MAINTENANCE
AND REPLACE WITH NEW OAS
COMPRESSOR.
REMOVAL
RECOVERY UNIT
GAS COMPRESSOR
AC
REPLACEMENT PROJECT.'
151192007 0.01
10X51007 23'
N
FREE WATER KNOCK OUT MC
TAN( VAPOR RECOVERY UNITS
LEFT SHUT DOWN AFTER
MECHANICAL FALURE FOR
PLANNED COMPRESSOR
REPLACEMENT, RESULTING W
EXCESS FLARING{
OPERATIONAL
UNSCHEDULED MAINTENANCE
SHUT DOWN OF VAPOR
RECOVERY UNITS AND GAS
COMPRESSORS
TO PERFORM
AND REPLACE WITH NEW GA3
COMPRESSOR.
REMOVAL
RECOVERY UNIT
GAS COMPRESSOR
REPLACEMENT PROJECT.'
AC-0510
10/1512007 0 01
10/16(2007 33:59
449
N
FREE WATER KNOCK OUT AND
TANK VAPOR RECOVERY UNITS
LEFT SHUT DOWN AFTER
MECHANICAL FAILURE FOR
PLANNED COMPRESSOR
OPERATIONAL
UNSCHEDULED MAINTENANCE
SHUT DO..., OF ..`.A..
RECOVERY UNITS AND OAS
COMPRESSORS NECESSARY
TO PERFORM MAINTENANCE
AND REPLACE PATH NEW GAS
CCMPRESSOR. BEGAN
REMOVAL OF OLD VAPOR
RECOVERY UNIT
COMPRESSOR. EOUIPMENT TO
SE RETURNED TO NORMAL
OPERATIONS AS SOON AS
POSSIBLE.I
��
s
AC-0510
REPLACEMENT, RESULTING IN
EXCESS FLARING.'
10
15117/200723.59
447
N
FREE WATER KNOCK OUT AND
TANK VAPOR RECOVERY UNITS
LEFT SHUT DOWN AFTER
MECHANICAL FAILURE FOR
PLANNED COMPRESSOR
REPLACEMENT, RESULTING IN
EXCESS FLARING.,
OPERATIONAL
UNSCHEDULED MAINTENANCE
SMUT DOWN OF VAPOR
RECOVERY WETS AND GAS
COMPRESSORS NECESSARY
TO PERFORM MAINTENANCE
AND REPLACE With NEW GAS
COMPRESSOR. REMOVAL OF
OLD VAPOR RECOVERY UNIT
COMPRESSOR. EOUIPMENT TO
BE RETURNED TO NORMAL
OPERATIONS AS SOON AS
POSSIBLE'
GAB COMPRESSOR
REPLACEMENT PROJECT'
A - C - 0610
Facility Name:
Report Date: 11 /15/2007
ANNA PLATFORM
3z ge4
Excess Flare Log Report
Month/Year.
Oil-Ott-200T
Pape: 3 of 7
Date 8 Time
Event Gas
MCF
Planned?
Description of Incident
Category
Reason
Actions Taken
Stps Taken to
Minimize Recurrence
Equipment Down
MP -2 ID Number
Begin
End
10+142001
10/112007
495
N
FREE WATER KNOCK OUT AND
TANK VAPOR RECOVERY UNITS
LEFT SHUT DOWN AFTER
MECHAP CAL FAILURE FOR
OPERATIONAL
UNSCHEDULED MAINTENANCE
SHUT DOWN OF VAPOR
RECOVERY UNITS ANO GAS
COMPRESSORS NECESSARY
TO PERFORM MAINTENANCE
AND REPLACE WITN NEW OAS
COMPRESSOR. BEGAN
REMOVAL OF OLD VAPOR
RECOVERY UNIT
COMPRESSOR. EQUIPMENT TO
BE RETURNED TO NORMAL
OPERATIONS AS SOON AS
POSSIBLE.'
GAS COMPRESSOR
REPLACEMENT PROJECT.'
A-C-0610
PLANNED COMPRESSOR
REPLACEMENT, RESULTING IN
EXCESS FLARING.'
10119/2007 0 01
10/1912007 23 59
504
N
FREE WATER KNOCK OUT ANC
TANK VAPOR RECOVERY UNIT$
LEFT SHUT DOWN AFTER
MECHANICAL FAILURE FOR
PLANNED COMPRESSOR
REPLACEMENT, RESULTING IN
EXCESS FLARING.'
OPERATIONAL
UNSCHEDULED MAINTENANCE
SHUT DOWN OF VAPOR
RECOVERY UNITS AND GAS
COMPRESSORS NECESSARY
TO PERFORM MAINTENANCE
AND REPLACE WITH NEW OAS
COMPRESSOR. REMOVAL OF
OLO VAPOR RECOVERY UNIT
GAB COMPRESSOR
REPLACEMENT PROJECT.'
A-C-0440
COMPRESSOR. EQUIPMENT TO
BE RETURNED TO NORMAL
OPERATIONS AS 800N AS
POSSIBLE./
10120.'2007
1020/20072359
306
N
FREE WATER KNOCK OUT Alt
TAMA VAPOR RECOVERY UNITS
LEFT SMUT DOWN AFTER
MECHANICAL FALURE FOR
PLANNED COMPRESSOR
REPLACEMENT, RESULTING IN
OPERATIONAL
UNSCHEDULED MAINTENANCE
SHUT DOWN OF VAPOR
RECOVERY UNITS AND GAS
COMPRESSORS NECESSARY
TO PERFORM MAINTENANCE
AND REPLACE WITH NEW GAB
COMPRESSOR. REMOVAL OF
OLD VAPOR RECOVERY UMT
COMPRESSOR. EQUIPMENT TO
BE RETURNED TO NORMAL
OPERATIONS AS SOON AS
POSSIBLE]
GAS COMPRESSOR
REPLACBENT PROJECT]
AC-D510
EXCESS FLARING.!
1021/2007 001
10721/2007 2159
494
14
FREE WATER KNOCK OUT AND
TAN( VAPOR RECOVERY UNITS
LEFT SMUT DOWN AFTER
MECHANICAL FAILURE FOR
PLANNED COMPRESSOR
REPLACEMENT, RESULTING IN
EXCESS FLARING.'
OPERATIONAL
UNSCHEDULED MAINTENANCE
SHUT DOWN OF VAPOR
OAS COMPRESSOR
REPLACEMENT PROJECT]
A -C-0510
RECOVERY UNITS AND GA$
COMPRESSORS NECESSARY
TO PERFORM MAINTENANCE
MO REPUCE WITH KEW GAS
COMPRESSOR. REMOVAL OF
OLD VAPOR RECOVERY UNIT
COMPRESSOR. EQUIPMENT TO
tE RETURNED TO NORMAL
OPERATIONS AS SOON AS
POSSIBLE.!
Facility Name:
Report Date: 117152007
ANNA PLATFORM
14 89 µcr
Excess Flare Log Report
Month Year.
01-Oct-2007
Page: 4 of 7
Date & Time
Event Gas
MCF
Planned?
Description of Incident
Category .
Reason
Actions Taken
Steps Taken to
Minknize Rotuma.
Equipment Down
MP -2 ID Number
Begin
End
1022/2007000
10!22120072359
4S1
N
FREE WATER KNOCK OUT AND
TANK VAPOR RECOVERY UNITS
LEFT SHUT DOWN AFTER
MECHANICAL FAILURE FOR
PLANNED COMPRESSOR
OPERATIONAL
UNSCHEDULED MAINTENANCE
SHUT DOWN OF VAPOR
GAS COMPRESSOR
A-C-0610
RECOVERY UNITS AND GAS
COMPRESSORS NECESSARY
TO PERFORM MAINTENANCE
AND REPLACE WITH NEW GAS
COMPRESSOR. REMOVAL OF
OLD VAPOR RECOVERY UNIT
AND G48 COMPRESSOR.
EOLAPMENT TO SE RETURNED
TO NORMAL OPERATIONS AS
SOON AS POSSIBLE./
REPLACEMENT PROJECT,/
REPLACEMENT, RESULTING IN
EXCESS FUPINti
10230037 081
10'23)200723
451
N
FREE WATER KNOCK OUT AND
TANK VAPOR RECOVERY UMTS
LEFT SHUT DOWN AFTER
MECHANICAL FALURE FOR
PLANNED COMPRESSOR
OPERATIONAL
UNSCHEDULED MAINTENANCE
SHUT DOWN OF VAPOR
RECOVERY UNITS AND GAS
COMPRESSORS NECESSARY
TO PERFORM MAINTENANCE
ANO REPLACE WITH NEW GAS
COMPRESSOR. REMOVAL OF
OLD VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE RETURNED
TO NORMAL OPERATIONS AS
SOON AS POSSIBLE/
GAS COMPRESSOR
REPLACEMENT PROJECT./
AC-0510
REPLACEMENT, RESLLTNG IN
EXCESS FLARING 1
1024720070
723.59
525
N
FREE WATER KNOCK OUT Alt
TAM( VAPOR RECOVERY UNITS
LEFT SHUT DOWN AFTER
MECHANICAL FAILURE FOR
PLANNED COMPRESSOR
REPLACEMENT. RESULTING IN
EXCESS FLARING./
OPERATIONAL
UNSCHEDULED MAINTENANCE
SMUT DONN OE VAPOR
RECOVERY
COMPRESSORS
TO PERFORM
BEGAN INSTALLATION
VAPOR RECOVERY UNIT ANO
GAS COM
EQUIPMENT
TO NORMAL _. E- _..._.SAS
SOON AS PO581BLE.t
GAS COMPRESSOR
REPLACEMENT PROJECT./
A4-0510
10252007001
10/25/200723:59
a
N
FREE WATER KNOCK OUT AND
TANK VAPOR RECOVERY UNITS
LEFT SHUT DOWN AFTER
MECHANICAL FAILURE FOR
PLANNED COMPRESSOR
REPLACEMENT, RESULTING W
EXCESS FLARING!
OPERATIONAL
UNSC/EOULEO MANTENANCE
SHUT DOWN OF VAPOR
RECOVERY UNITS AND OAS
COMPRESSORS NECESSARY
TO PERFORM MAINTENANCE.
BEGAN INSTALLATION OF NEW
VAPOR RECOVERY UNIT AND
GAS COMPRESSOR
EQUIPMENT TO BE RETURNED
TO NORMAL OPERATIONS AS
500N AS POSSIBLE./
11
A.C-0610
Facility Name:
Report Date: 11/15/2007
ANNA PLATFORM
1541 PLC'
Excess Flare Log Report
Month/Year.
01- Oct -2007
Pape: 5 of 7
Date & Time
Event Gas
MCF
Planned?
Description of Incident
Category
OPERATIONAL
UNSCHEDULED MAINTENANCE
Acgone Taken
BRUT DOWN OF VAPOR
RECOVERY UNITS AND GAS
COMPRESSORS NECESSARY
TO PERFORM WMTENANCE.
PERFORMING INSTALLATION
OF NEW VAPOR RECOVERY
UNIT AND GAS COMPRESSOR.
EOIIIPMENT TO BE RETURNED
TO NORMAL OPERATIONS AS
SOON AS P088481.84
Step Taken to
Minimize Recurmenee
GAB COMPRESSOR
Equipment Down
MP•2 ID Number
400610
Begin
End
10!!120010.
1012&1200723.59
432
H
FREE WATER KNOCK OUT AND
TANK VAPOR RECOVERY UNITS
LEFT SMUT DOWN AFTER
MECHANICAL FALURE FOR
PLANNED COMPESSOR
REPLACEMENT PROJECT.'
REPLACEMENT, RESULTING IN
EXCESS FLARING.$
W27120070
*027(20072358
442
N
FREE WATER KNOCK OUT AND
TANK VAPOR RECOVERY UNITS
LEFT SHUT DOWN AFTER
MECHANICAL FAILURE FOR
PLANNED COMPRESSOR
REPLACEMENT. RESULTING IN
EXCESS FLARING -I
OPERATIONAL
UNSCHEDULED MAINTENANCE
SMUT DOWN OF VAPOR
RECOVERY UNITS AND GAS
COMPRESSORS NECESSARY
TO PERFORM MW NTENANCE.
PERFORMING INSTALLATION
OF NEW VAPOR RECOVERY
UNIT AND GAS COMPRESSOR.
EQUIPMENT TO BE RETURNED
TO NORMAL OPERATIONS AS
SOON AS POSSIBLE'
GAS COMPRESSOR
AJCA610
REPLACEMENT PROJECT.'
1029/2007 091
MEN2007 23.59
439
N
FREE WATER KNOCK OUT AND
TANK VAPOR RECOVERY UNITS
LEFT SMUT DOWN AFTER
MECHANICAL FAILURE FOR
PLANNED COMPRESSOR
REPLACEMENT. RESULTING IN
EXCESS FLARING.'
OPERATIONAL
UNSCHEDULED MANTENANCE
SHUT DOWN OF VAPOR
RECOVERY UNITS AND GAB
COMPRESSORS NECESSARY
TO PERFORM MAINTENANCE.
PERFORMING INSTAUATKR
OF NEW VAPOR RECOVERY
UNIT ANO GAS COMPRESSOR.
EQUIPMENT TO BE RETURNED
TO NORMAL OPERATIONS AS
SOON As POS8ISLE4
GAS COMPRESSOR
AC-0610
REPLACEMENT PROJECT.'
10@82007001
10/29/200723:59
437
N
FREE WATER KNOCK OUT ANO
TAN( VAPOR RECOVERY UNITS
LEFT SHUT DOWN AFTER
MECHANICAL FAILURE FOR
PLANNED COMPRESSOR
REPLACEMENT, RESULTING IN
EXCESS FLARING)
OPERATIONAL
UNSCHEDULED MAINTENANCE
SHUT DOWN OF VAPOR
RECOVERY UNITS AID GAS
COMPRESSORS NECESSARY
TO PERFORM MANTENANCE.
PERFORMING INSTALLATION
Of NEW VAPOR RECOVERY
UNIT AND GAS COMPRESSOR.
EQUIPMENT TO BE RETURNED
TO NORMAL OPERATIONS AS
SOON AS POSSIBLE.'
OAS COMPRESSOR
REPLACEMENT PROJECT.'
A.0.0610
Facility Name:
Report Date: 11/15/2007
ANNA PLATFORM
1 75a ALF
Excess Flare Log Report
Month/Year.
01- Oct -2007
Page: 6 of 7
Data & Time
Event Gas
Steps Taken to
Equipment Down
Begin
End
MCF
Planned?
Description of Incident
Category
Reason
Actions Taken
Minimise Recumence
MP-2 10 Number
1000/20127 0:01
10
4St
N
FREE WATER KNOCK OUT MO
OPERATIONAL
UNSCHEDULED MAJNTENANCE
SHUT DOWN OF VAPOR
GM COMPRESSOR
AC-0610
TAM{ VAPOR RECOVERY UNITS
RECOVERY UNITS MID OAS
REPLACEMENT PROJECT.'
LEFT SHUT DOWN AFTER
COMPRESSORS NECESSARY
MECHANICAL FAILURE FOR
TO PERFORM MAINTENANCE.
PLANNED COMPRESSOR
PERFORMING INSTALLATION
REPLACEMENT. RESULTING IN
OF NEW VAPOR RECOVERY
EXCESS FLARING'
UNIT AND GM COMPRESSOR.
EQUIPMENT 10 SE RETURNED
TO NORMAL OPERATIONS AS
SOON AS POSSIBLE.'
100112007 001
10212007 23 59
443
N
FREE WATER KNOCK 01.17 AND
OPERATIONAL
UNSCHEDULED MAINTENANCE
SHUT DOWN OF VAPOR
OAS COMPRESSOR
A - C - 0610
TANI( VAPOR RECOVERY UNITS
RECOVERY UNITS AND GM
REPLACEMENT PROJECT.'
LEFT SHUT GOWN AFTER
COMPRESSORS NECESSARY
MECHANICAL FAILURE FOR
TO PERFORM MAINTENANCE.
PLANNED COMPRESSOR
PERFORMING INSTALLATION
REPLACEMENT. RESULTING IN
OF MW VAPOR RECOVERY
EXCESS FLARING'
UNIT AND OAS COMPRESSOR.
EQUIPMENT TO SE RERIRNEO
TO NORMAL OPERATIONS AS
SOON M POSSIBLE'
18681
Facility Name:
Report Date: 11/15/2007
ANNA PLATFORM
S 71LCF
Excess Flare Log Report
Month/Year
ail � S/07
01-Oct-2007
Page: 7 of 7
1. Facility Number
1330000005
2. Facility Name
ANNA PLATFORM
3. Field
GRANITE POINT
4. Operator
UNOCAL ALASKA
5. MoneJVwr of Deposition
November - 07
Disposition
Volume MCF
"
20. For production from multiple pools, 1st cmnbibu6an dead, pool as 5 percent of
Total Volume.
8. Sold
0
Pool Name
Pool Code
Percent
7. Reinjected
0
18742
280150
100.00%
8 Flared or vented 1 hour or less
0
0 Flared or vented more than 1 hour (see instil
20,559
10. Pilot end Purge
210
11. Used for tease operations (speedy in Remarks)
1,529
12. Other (see instructions)
0
Authorization >1 hr.
Safely
?0 55 `f
MCF
13. TOTAL VOLUME (ITEMS 6.12)
22,298
Lease Use
MCF
14. NGL Gas Equivalent
0
Conseetve(bn
MCF
15. Purchased gas
28,953
waste:
MCF
16. Transferred from:
0
/ - 9 - 0 8
17. Transferred to: (Express as a negative e)
0
Canartissldner Date
16. Remarks:
Transferred From: Bruce Platform
Transferred To: GPTF -LE%
CPTF -AB
Bruce Platform
0
0
0
0
I hereby certify Mal the foregoing
Signature Y4
is true and correct to the best of my knowledge.
'�
role
Production Accountant
Note: All volumes must be corrected
to pressure of 14.55 psis and to a
temperature of 60o F. Authority 20
AAC25.235.
.
Panted Name Mary Indlhar Phone
7134324238 Date December 13, 2007
Form 10-422 Rev. 2/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
INSTRUCTIONS ON REVERSE SIDE
Submit In Duplicate
Chevron
tAt 1 Plauuct Ue•.u.ption of Inculcnl Ca[ee;c ry
He a o n.
r.ti, x,11
H oc_..... :
AL bnns f 1
[-quip..<.,
[),.v:.. MP-
11/012007 12:01 AM 11/01/2007 11:69 PM 448
11/02/2007 12:01 AM 11/02/2007 11:69 PM 443
ANNA PLATFORM
N FREE WATER KNOCK OPERATIC
OUT AND TANK
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT,
RESULTING IN
EXCESS FLARING.'
N FREE WATER KNOCK OPERATIONAL SCHEDULED
OUT AND TANK MAINTENANCE
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT,
RESULTING IN
EXCESS FLARING.'
Page 1
Excess Flare Report
Month: November Year. 2007
L SCHEDULED GAS
MAINTENANCE COMPRESSOR
REPLACEMENT
PROJECT.'
GAS
COMPRESSOR
REPLACEMENT
PROJECT.)
SHUT DOWN OF VAPOR A -C•051
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE.'
SHUT DOWN OF VAPOR A-C-061
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND OAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE.'
11103/2007 12:01 AM 11/032007 1139 PM 440
11/04/2007 12:01 AM 11/04/2007 11:59 PM 408
ANNA PLATFORM Continued
N FREE WATER KNOCK OPERATIONAL SCHEDULED
OUT AND TANK
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT,
RESULTING IN
EXCESS FLARING.'
Page 2of19
Excess Flare Report
Month: November Year 2007
Dar. 8. lent
Begin t
MCF plan neo Cc-e.t.a Or Incident Category
st. 1r - rskee to
rrletatior
Pt ocbUrrW0.tl
A ellu
Prentenen
Down MP-
N FREE WATER KNOCK OPERATIONAL SCHEDULED
OUT AND TANK MAINTENANCE
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHAN ICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT.
RESULTING IN
EXCESS FLARING.'
MAINTENANCE
GAS
COMPRESSOR
REPLACEMENT
PROJECT.'
GAS
COMPRESSOR
REPLACEMENT
PROJECT.'
SHUT DOWN OF VAPOR
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE.'
SHUT DOWN OF VAPOR
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE.
A-C-061
AC.-051
Chevron
11/05/2007 12:01 AM 11/052007 11:59 PM 443
11/08/2007 12:01 AM 11/08/2007 11:59 PM 477
ANNA PLATFORM Continued
BegiU L nJ
FaCI PlanneU UCM.rl ption ul lucid °lit Category
F u.,
oU
r:
It,oc Lure
1,
I ovni,MP-
N FREE WATER KNOCK
OUT AND TANK
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT.
RESULTING IN
EXCESS FLARING.'
Page 3 of 19
OPERATIONAL
Excess Flare Report
Month: November Year. 2007
Y FREE WATER KNOCK OPERATIONAL SCHEDULED
OUT AND TANK MAINTENANCE
VAPORRECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT.
RESULTING IN
EXCESS FLARING.'
SCHEDULED GAS
MAINTENANCE COMPRESSOR
REPLACEMENT
PROJECT.'
GAS
COMPRESSOR
REPLACEMENT
PROJECT.'
SHUT DOWN OF VAPOR A-C-051
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE.'
SHUT DOWN OF VAPOR A-C-061
RECOVERY UNITS AND
GM COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAB COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE.'
Chevron
ANNA PLATFORM Continued
tr,
Mtimmit
R(.:; Ceti rrel'Cc
F 1 tlI )I 1011
DOW n MP
DAL, rw.
BPgin f]ul (1C1 Pl: +niu.t De zc ri ptioi 1 of Incident Catcilo*v
PERATIONAL SCHEDULED
11/07/2007 12:01 AM 11/07/2007 11:59 PM 505
11/08/2007 12:01 AM 11/08/2007 11:69 PM 484
Y FREE WATER KNOCK
OUT AND TANK
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT.
RESULTING IN
EXCESS FLARING]
Y FREE WATER KNOCK OPERATIONAL SCHEDULED
OUT AND TANK MAINTENANCE
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT.
RESULTING IN
EXCESS FLARING.I
Page 4 of 19
Excess Flare Report
Month: November Year: 2007
GAS
MAINTENANCE COMPRESSOR
REPLACEMENT
PROJECT]
gas
COMPRESSOR
REPLACEMENT
PROJECT]
SHUT DOWN OF VAPOR
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE]
SHUT DOWN OF VAPOR
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE]
A-C-051
A-C-061
Chevron
N INO
ANNA PLATFORM Continued
f1.ar g lum•
He 9:n Ff,d
i .sue 1` of Imwdenl Cstap,l'y
I:ceso,
Uuv. 11 7P-
11/092007 12:01 AM 11/09/2007 11:59 PM 444
11/102007 12:01 AM 11/102007 11:59 PM 444
Y FREE WATER KNOCK OPERATIONAL SCHEDULED
OUT AND TANK MAINTENANCE
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT,
RESULTING IN
EXCESS FLARING./
Y FREE WATER KNOCK OPERATIONAL SCHEDULED
OUT AND TANK MAINTENANCE
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT,
RESULTING IN
EXCESS FLARING,/
Page 5 of 19
Excess Flare Report
Month: November Year. 2007
GAS
COMPRESSOR
REPLACEMENT
PROJECT./
GAS
COMPRESSOR
REPLACEMENT
PROJECT./
A•C -051
SHUT DOWN OF VAPOR
RECOVERY UNITS AND
OAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE./
SHUT DOWN OF VAPOR AC -061
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND OAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE./
ch�
11!11!2007 AM 11111/2007 11:59 PM 440
11/14/2007 12:01 AM 11/14/2007 11:59 PM 442
ANNA PLATFORM Continued
Excess Flare Report
Month: November Year: 2007
!Teton
1).14: Y. Tun
I ltd 611.i I'I,uuictl [n. sC IIpifun.u( Inodcnl Ualcqul
RC3f,
M 11:
A eUon
Cqu:pmal
Unwu f.9P
Y FREE WATER KNOCK OPERATIONAL SCHEDULED
OUT AND TANK MAINTENANCE
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT,
RESULTING IN
EXCESS FLARING.
N FREE WATER KNOCK OPERATIONAL UNSCHEDULED
OUT AND TANK MAINTENANCE
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT,
RESULTING IN
EXCESS FLARING.'
Page 8 of 19
GAS
COMPRESSOR
REPLACEMENT
PROJECT.'
GAS
COMPRESSOR
REPLACEMENT
PROJECT.'
SHUT DOWN OF VAPOR A-C-051
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE.'
SHUT DOWN OF VAPOR A-C.061
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO SE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE./
Chevron
I WO
IWO
ANNA PLATFORM Continued
L,id
1.1
I' t)
nldual:.1 Incident Gdtt:rior
HCASGtI
)III111 1
E.titn NIA;
quiprert
Lu.:l MP
11/16/2007 12:01 AM 11/1612007 11:59 PM 447
11/16200712:01 AM 11/182007 11:59 PM 448
N FREE WATER KNOCK OPERA ONAL UNSCHEDULED
OUT AND TANK
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT,
RESULTING IN
EXCESS FLARING.]
FREE WATER KNOCK OPERATIONAL UNSCHEDULED
OUT AND TANK MAINTENANCE
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT,
RESULTING IN
EXCESS FLARING.]
Page 7 of 19
Excess Flare Report
Month: November Year. 2007
GAS
MAINTENANCE COMPRESSOR
REPLACEMENT
PROJECT.]
OAS
COMPRESSOR
REPLACEMENT
PROJECT.]
SHUT DOWN OF VAPOR A-C-051
RECOVERY UNITS AND
OAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE.'
SHUT DOWN OF VAPOR A-C-051
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EOUIPMENT TO BE
RETURNED TO NORMAL.
OPERATIONS AS SOON
AS POSSIBLE.'
P.rgi
11/17/2007 12:01 AM 11/17/2007 11:58 PM 448
11/19/2007 12:01 AM 11/192007 11:69 PM 1150
ANNA PLATFORM Continued
Y FREE WATER KNOCK OPERATIONAL
OUT AND TANK
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT,
RESULTING IN
EXCESS FLARING.(
Page 8 of 19
Excess Flare Report
Month: November Year. 2007
U..lv Z Into
t ❑tl
H••SOn
bb i; IY�n l• .
M
lu. u. 1 r.
tk
Fr1UiPnu 11
DOV/11 MP-
PAI.F Piznnotl DC•Schl1ton of IIIL IIICIIt Cdtvyniy
N FREE WATER KNOCK OPERATIONAL UNSCHEDULED
OUT AND TANK MAINTENANCE
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT,
RESULTING IN
EXCESS FLARING.(
UNSCHEDULED
MAINTENANCE
GAS
COMPRESSOR
REPLACEMENT
PROJECT.(
OAS
COMPRESSOR
REPLACEMENT
PROJECT"
SHUT DOWN OF VAPOR A-C-051
RECOVERY UNITS AND
OAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE"
SHUT DOWN OF VAPOR A -C-061
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMEN TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE.(
Chevron
I WO
Begin
1120/2007 12:01 AM 11/20/2007 11:59 PM 1150
1121200712:01 AM 11/21/2007 11:59 PM 1150
ANNA PLATFORM Continued
Excess Flare Report
Month: November Teen 2007
lint
End
MCF Plannod Dos c ri pt,on of Incident Cater ory Reason
stays I.,kcn ILL
Minunvt
Raoc cnnOncv
1i IJn
Equipn:n
Uown MP-
Y FREE WATER KNOCK OPERATIONAL UNSCHEDULED
OUT AND TANK MAINTENANCE
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT,
RESULTING IN
EXCESS FLARING.'
Y FREE WATER KNOCK OPERATIONAL UNSCHEDULED
OUT AND TANK MAINTENANCE
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT,
RESULTING IN
EXCESS FLARING.'
Page 9ot19
GAS
COMPRESSOR
REPLACEMENT
PROJECT./
GAS
COMPRESSOR
REPLACEMENT
PROJECT.'
SHUT DOWN OF VAPOR AC -061
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE.I
SHUT DOWN OF VAPOR AC-061
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE.'
Chevron
11/22/2007 12:00 AM 11/22/2007 11:59 PM 1160
11/23/2007 12:01 AM 11/23/2907 11:59 PM 1150
ANNA PLATFORM Continued
Y FREE WATER KNOCK OPERATIONAL
OUT AND TANK
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT,
RESULTING IN
EXCESS FLARING.'
Page 10 of 19
Excess Flare Report
Month: November Year: 2007
u ion:
Begin rod
F
C!a,.ucd Description ul Incident (-meow;
Koasun
5t. Ft, I. n t
r.:int
.1oen , 1.in,
Inipr ,:
Clown P.1P-
Y FREE WATER KNOCK OPERATIONAL UNSCHEDULED
OUT AND TANK MAINTENANCE
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT.
RESULTING IN
EXCESS FLARING.(
UNSCHEDULED
MAINTENANCE
GAS
COMPRESSOR
REPLACEMENT
PROJECT.)
GAS
COMPRESSOR
REPLACEMENT
PROJECT.
SHUT DOWN OF VAPOR AC-061
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND OAS COMPRESSOR. •
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE.
SHUT DOWN OF VAPOR A-C-061
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE.{
chevron
Dat: &Inn
End
kca ,on
stet- . T 1Y'\: t
kr ., wren,
r, 1ukt It
Lryitymen
Down MP
Degln
11!2412007 12:01 AM 11 .4/2007 11:59 PM 1150
11/26/2007 12:01 AM 11/25/2007 11:59 PM 1150
ANNA PLATFORM Continued
IACT Planned LIP- CILIA/011 or Incident Catcyory
Y FREE WATER KNOCK OPERATIC
OUT AND TANK
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT,
RESULTING IN
EXCESS FLARING.I
Y FREE WATER KNOCK OPERATIONAL UNSCHEDULED
OUT AND TANK MAINTENANCE
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT,
RESULTING IN
EXCESS FLARING.I
Page 11 of 19
Excess Flare Report
Month: November Yeas 2007
L UNSCHEDULED
MAINTENANCE
GAS
COMPRESSOR
REPLACEMENT
PROJECT.'
GAS
COMPRESSOR
REPLACEMENT
PROJECT,(
SHUT DOWN OF VAPOR A-C-061
RECOVERY UNITS AND
OAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE.
SHUT DOWN OF VAPOR A -C-061
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY To
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE.'
ch.vron
IWO
IWO
E■ent
MC I-
Planned Oeuriptron of Incident Category
Nc an sn
'Up",
%Lindh,.
I2eoC6orrence
Action
Date 8.11911
Berpn Friel
11126/2007 12:01 AM 11/26/2007 11:59 PM 1150
11/27/2007 12:01 AM 11/27/2007 11:69 PM 1150
ANNA PLATFORM Continued
Y FREE WATER KNOCK OPERATIONAL NORMAL
OUT AND TANK OPERATIONS
VAPOR RECOVERY •
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT,
RESULTING IN
EXCESS FLARING.
Y FREE WATER KNOCK OPERATIONAL
OUT AND TANK
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT,
RESULTING IN
EXCESS FLARING./
Page 12 of 19
Excess Flare Report
Month: November Year: 2007
SCHEDULED
MAINTENANCE
GAS
COMPRESSOR
REPLACEMENT
PROJECT.$
GAS
COMPRESSOR
REPLACEMENT
PROJECT.
SHUT DOWN OF VAPOR
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE./
SHUT DOWN OF VAPOR
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE./
Lquipnwn
Doom MP-
A-C-061
Chevron
I SO
MOO
Regis
nate 8 loan
End
MCP' Planned n, nptinn of Incident Cateyoty
Rc o s on
Steps T_,k1. t
PA 11:11111/
Rnrcr urreie.e
Aclicn1 1 aken
F.quipmrn
Duvet MP-
1128200712:01 AM 11282007 11:59 PM 1150
112912007 AM 1129200711:59 PM 1150
ANNA PLATFORM Continued
Y FREE WATER KNOCK OPERATIONAL SCHEDULED
OUT AND TANK MAINTENANCE
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT,
RESULTING IN
EXCESS FLARING.I
Y FREE WATER KNOCK OPERATIONAL SCHEDULED
OUT AND TANK MAINTENANCE
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT,
RESULTING IN
EXCESS FLARING.I
Page 13 of 19
Excess Flare Report
Month: November Year: 2007
GAS
COMPRESSOR
REPLACEMENT
PROJECT.'
GAS
COMPRESSOR
REPLACEMENT
PROJECT.'
SHUT DOWN OF VAPOR A-PM-0S
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL.
OPERATIONS AS SOON
AS POSSIBLE.'
SHUT DOWN OF VAPOR A-PM-0S
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE.I
Chevron
I WO
11/30/2007 12:01 AM 11/30/2007 11:59 PM 1150
ANNA PLATFORM Continued
Y FREE WATER KNOCK OPERATIONAL
OUT AND TANK
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT.
RESULTING IN
EXCESS FLARING.
Page 14 of 19
Excess Flare Report
Month: November Year: 2007
D.de 8 Tuui,
Begin End
.vnt Get
MCI' Planned Description of incident Catcyory
Reason
Strp: iaIe■ to
hfi n n c
Rcoccurrr :
AC tur l aken
Equipmmn
Down MP-
.
SCHEDULED
MAINTENANCE
OAS
COMPRESSOR
REPLACEMENT
PROJECT.I
r ?1/2 /J,
1 �1 tr3
SHUT DOWN OF VAPOR A -PM-05
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE.,
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
GAS DISPOSITION
Form 10-422 Rev. 2/2004
INSTRUCTIONS ON REVERSE SIDE
Submit In Dupicab
1. Facility Number
1330000005
2. Facility Name
ANNA PLATFORM
3. Field
GRANITE POINT
4. Operator
UNOCAL ALASKA
5. Mono'w of Disposition
December -07
Disposition
Volume MCF
20. For production from multiple pools, Gat contribution of each pod as • Anent II
Total Volume.
8. Sold
0
Pool Name
Pool Code
Percent
7. Reinjected
0
18742
280150
100.00%
6. Flared or vented 1 hour Or less
0
9. Flared or vented more than 1 hour (see instr.)
35,850
10. Pilot and Purge
21 7
11. Used for base operations (specify In Remarks)
5,458
Safety
.3 S, b AZ
MCP
12. Other (see instructions)
G
Authorization >1 hr'
13. TOTAL VOLUME (VIEWS 6 -12)
41 325
Lease Use
MCF
14. NGL Go Equivalent
0
Conservation
MCF
15 Purchased pas
20,346
Waste:
MCF
18. Transrred from:
17. Transferred to: (Express as a negative 1)
0
(20)
��(f, /./ _______
/t// // Commissioner Date
18. Remarks: p
Transferred From: Bruce Platform o .�+ H,., — /� efida- est
Transferred To GPTF - LEX 0
GPTF - (20) `nr-454.
Bruce Platform 0
I hereby certify that ale foregoing is true and correct to the best of my knowledge.
Signature Tina Production Accountant
Note: All volumes must be consoled
Note:
pressure of 14.85 psis and to a
temperature of 60o F. Authority 20
AAC25.235.
Printed Name Mary Indlhar Phone 713-4324238 Date January 16, 2008
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
GAS DISPOSITION
Form 10-422 Rev. 2/2004
INSTRUCTIONS ON REVERSE SIDE
Submit In Dupicab
O:a•
l:n Ina
12/01 . 1111 7 12:11 AM 12/01 • l 11:
11
12/02/2007 12:01 AM 12/02/2007 11:58 PM 1150
Y FREE WATER KNOCK
OUT AND TANK
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT,
RESULTING IN
EXCESS FLARING-I
ANNA PLATFORM
Page 1
Excess Flare Report
Month: December Year. 2007
u, L
. 1
It pS I 4•11
ID *i.1.1f'.
f :I 1::. ,r�y:6. a: n( lui idrya C Y. r,..ry I'..i'nn
•P =7. FO` • L SCHEDULED GAS
MAINTENANCE
Y FREE WATER KNOCK OPERATIONAL SCHEDULED
OUT AND TANK MAINTENANCE
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL.
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT,
RESULTING IN
EXCESS FLARING.
COMPRESSOR
REPLACEMENT
PROJECT.'
GAS
COMPRESSOR
REPLACEMENT
PROJECT.'
SHUT DOWN OF VAPOR A -PM.OS
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE.)
SHUT DOWN OF VAPOR A -PM•O&
RECOVERY UNITS AND
OAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS 80014
AS POSSIBLE.)
1.101
, r
;co I I..ua u_J I nplwn of hlu Ji ni t_.i •.yorJ
Hewn
101 cif t r.(It
to (Ili ns 1.0u0
LiuWu MP-
121032007 12:01 AM
00711: ' PM 1160
12/04/200712:01 AM 12104/200711:09 PM 1150
ANNA PLATFORM Continued
Y FREE WATER KNOCK OPERA
OUT AND TANK
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT.
RESULTING tN
EXCESS FLARING.'
Excess Flare Report
Month: December Year. 2007
0 L UNSCHEDULED
MAINTENANCE
Y FREE WATER KNOCK OPERATIONAL UNSCHEDULED
OUT AND TANK MAINTENANCE
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT.
RESULTING IN
EXCESS FLARING.'
Page 2 of 19
GAS
COMPRESSOR
REPLACEMENT
PROJECT.'
GAS
COMPRESSOR
REPLACEMENT
PROJECT.'
SHUT DOWN OF VAPOR A - C - 051
RECOVERY UNITS AND
OAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE.'
SHUT DOWN OF VAPOR A -C-O51
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE'
Chevron
IWO
ANNA PLATFORM Continued
II,1i F III(.
mr
I 1)., . ■ It _,. „t to tt
; 1.1 I1 o,
I.1 J 111
Pf ocr. trrc tit o
_yuq
1
1205/2007 12:01 AM 12/05/2007 1 : •% PM 1150
12/Q 200712A1 AM 12/00/2007 1 1:59 PM 1150
Y FREE WATER KNOCK OPERATI
OUT AND TANK
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT.
RESULTING IN
EXCESS FLARING./
Y FREE WATER KNOCK OPERATIONAL UNSCHEDULED
OUT AND TANK MAINTENANCE
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT,
RESULTING IN
EXCESS FLARING./
Page 3 of 19
Excess Flare Report
Month: December Year. 2007
UNSCHEDULED GAS
COMPRESSOR
REPLACEMENT
PROJECT./
MAINTENANCE
GAS
COMPRESSOR
REPLACEMENT
PROJECT./
SHUT DOWN OF VAPOR A-C -061
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE./
SHUT DOWN OF VAPOR A•C-061
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE./
ANNA PLATFORM Continued
I
61r' P i414nLll. 4 U•' I r,n O l Inc .4. nt ,HOq�a,
o on
TaIrn
1 roccu '01
A.
, 11111 1 111._•11
11,,,,,1 n1r
I. ref
12/07/200712:00 AM 1 r 7!200711:59
12/01V2007 12:01 AM 12/06/2007 11:59 PM 1150
n ,11
1150 Y FREE WATER KNOCK OPERATIO
OUT AND TANK
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT,
RESULTING IN
EXCESS FLARING./
Y FREE WATER KNOCK OPERATIONAL UNSCHEDULED
OUT AND TANK MAINTENANCE
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT,
RESULTING IN
EXCESS FLARING./
Page 4 of 19
Excess Ram Report
Month: December Year: 2007
UNSCHEDULED GAS
MAINTENANCE
COMPRESSOR
REPLACEMENT
PROJECT./
OAS
COMPRESSOR
REPLACEMENT
PROJECT./
SHUT DOWN OF VAPOR A-C-061
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE.)
SHUT DOWN OF VAPOR A C-C61
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND OAS COMPRESSOR.
EQUIPMENT TO SE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE./
' Ir;, T.,;•.. , 1
Y yu;pmCn
Down r,uP-
12/00/2007 12:01 AM 12!00/2007 11:
12110200712 :01 AM 12/10/2007 11:59 PM 1150
ANNA PLATFORM Continued
an a L., ,; n,., � „I t fl t . a.:,; .,
1130 V FREE WATER KNOCK OPERATI•
OUT AND TANK
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT,
RESULTING IN
EXCESS FLARING./
Y FREE WATER KNOCK OPERATIONAL UNSCHEDULED
OUT AND TANK MAINTENANCE
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT,
. RESULTING IN
EXCESS FLARING./
Page 5 of 19
Excess Flare Report
Month: December Year: 2007
NAL UNSCHEDULED
MAINTENANCE
GAS
COMPRESSOR
REPLACEMENT
PROJECT./
GAS
COMPRESSOR
REPLACEMENT
PROJECT./
SHUT DOWN OF VAPOR A
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE./
SHUT DOWN OF VAPOR A-C-051
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE/
chs
1 2111 2007 12:01 AM 12/1
12/1212007 12:01 AM 12/12/200711:69 PM 1160
ANNA PLATFORM Continued
na
11: >: PM 1160 Y FREE WATER KNOCK 0
A. I OUT AND TANK
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT.
RESULTING IN
EXCESS FLARING.'
Page 6 of 19
Excess Flare Report
Month: December Year: 2007
uiucii L1 It III ui I ILLI-W l <..0
RATIO ►�
I e uumrn
' Uo
MAINTENANCE
Y FREE WATER KNOCK OPERATIONAL UNSCHEDULED
OUT AND TANK MAINTENANCE
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT,
RESULTING IN
EXCESS FLARING.'
UNSCHEDULED GAS
COMPRESSOR
REPLACEMENT
PROJECT.'
GAS
COMPRESSOR
REPLACEMENT
PROJECT.'
SHUT DOWN OF VAPOR A-C -061
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL.
OPERATIONS AS SOON
AS POSSIBLE.'
SHUT DOWN OF VAPOR A-C-061
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE.i
r
,r .iiU(1.JI,7 f_ 101; t(
RA •NAL UNSCHEDULED GAS
i- ir.,rn ro: n
U, es MP-
T.,a „,
SHUT DOWN OF VAPOR
a ,y�
12/13/2001 12:01 AM 1 .1711: -' P 160
12/14/2007 12:01 AM 12/14/2007 11:69 PM 1160
ANNA PLATFORM Continued
Y FREE WATER KNOCK
OUT AND TANK
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT,
RESULTING IN
EXCESS FLARING
Y FREE WATER KNOCK OPERATIONAL
OUT AND TANK
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT.
RESULTING IN
EXCESS FLARING]
Page 7 of 19
Excess Ram Report
Month: December Year. 2007
MAINTENANCE
UNSCHEDULED
MAINTENANCE
COMPRESSOR
REPLACEMENT
PROJECT.'
GAS
COMPRESSOR
REPLACEMENT
PROJECT.'
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS P0881BL
SHUT DOWN OF VAPOR
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE.'
1
A-C-061
Heflin
url , ::r ,r
Slops r .,k, , to
11.11 ai Ra D•
r:coC..unetk t.
i.; tipm, I.ik.:II
r _t,rrho
Uor+u MP.
•
12/15/200712:01 AM 12/15400711:
12/15/2007 12 01 AM 12/18/200711:59 PM 1150
ANNA PLATFORM Continued
tr ILr I nl 111, I'll vtl C.rlvgt,ry
•P - 7TIONAL UNSCHEDULED GAS
COMPRESSOR
REPLACEMENT
PROJECT.(
1150 Y FREE WATER KNOCK
OUT AND TANK
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT.
RESULTING IN
EXCESS FLARING.{
Y FREE WATER KNOCK OPERATIONAL UNSCHEDULED
OUT AND TANK MAINTENANCE
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT.
RESULTING IN
EXCESS FLARING.'
Page 8 of 19
Excess Flare Report
Month: December Year•. 2007
MAINTENANCE
GAS
COMPRESSOR
REPLACEMENT
PROJECT.'
A-C-051
SHUT DOWN OF VAPOR
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE.'
SHUT DOWN OF VAPOR A.0 -051
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE.'
12/17/2007 12:01 AM 12/17/2007 11:69 PM 1160
12/18/20071201 AM 12/18200711:69 PM 1160
ANNA PLATFORM Continued
Excess Flare Report
Month: December Year 2007
FL.
Lnd
t it
a Fla IJ_;..,nphon of lnadcnt Calcgoip
F.`ascn
SL:Ir. T.4 iLI n
fLn Iiii:c
Ficoct.urrt:ncc
Actioin f.4cny
1. ItJ 1 cn
Uu•en MP-
Y FREE WATER KNOCK OPERATIC
OUT AND TANK
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT,
RESULTING IN
EXCESS FLARING./
Page 9of19
AL UNSCHEDULED GAS
MAINTENANCE COMPRESSOR
REPLACEMENT
PROJECT.)
Y FREE WATER KNOCK OPERATIONAL UNSCHEDULED
OUT AND TANK MAINTENANCE
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT.
RESULTING IN
EXCESS FLARING./
GAS
COMPRESSOR
REPLACEMENT
PROJECT.
SHUT DOWN OF VAPOR A -0-061
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE./
SHUT DOWN OF VAPOR A-C-061
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE./
1).■• r L' I ir n :
tn..; Lui
T tr
4 <c asun
u, r.4 to
rl; itllO.i:"
F• o curretin.
A., +:. i ek�.n
,
Uovn, MP-
12/19/200712:01 AM 1
711:
12/24/200712:01 AM 1212012007 11:69 PM 1150
ANNA PLATFORM Continued
r:K -F V'launod Cc'.a.l l UOn )1 %cxlcul C,rtCalt..%
Y FREE WATER KNOCK OPERATIONAL
11
OUT AND TANK
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT,
RESULTING IN
EXCESS FLARING.'
V FREE WATER KNOCK OPERATIONAL UNSCHEDULED
OUT AND TANK MAINTENANCE
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT,
RESULTING IN
EXCESS FLARING.
Page 10 of 19
Excess Flare Report
Month: December Veer: 2007
UNSCHEDULED
MAINTENANCE
GAS
COMPRESSOR
REPLACEMENT
PROJECT.'
GAS
COMPRESSOR
REPLACEMENT
PROJECT.'
SHUT DOWN OF VAPOR
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTAUATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE.'
SHUT DOWN OF VAPOR
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE.'
A-C-051
A -C•061
ANNA PLATFORM Continued
•t
I!L'(j'.
11.
,F. - 1
Httl': r.. ,dF.,. 11
L r1U 1I rn1Ci1
I :own MP-
12/21/2007 12:01 AM
Lh -1 i9.,nn(,I 1L..+ r,Idli.1[ rd Inch it n( L..µ,
11:66 '" 11. Y FREE WATER KNOCK • "ERA • r
OUT AND TANK
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT,
RESULTING IN
EXCESS FLARING./
12/22/2007 12:01 AM 12/22/2007 11:60 PM 1150 Y FREE WATER KNOCK OPERATIONAL. UNSCHEDULED
OUT AND TANK MAINTENANCE
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT,
RESULTING IN
EXCESS FLARING./
Pa90 11 of 19
Excess Ram Report
Month: December Year. 2007
UNSCHEDULED GAS
COMPRESSOR
REPLACEMENT
PROJECT.►
MAINTENANCE
GAS
COMPRESSOR
REPLACEMENT
PROJECT./
SHUT DOWN OF VAPOR A -C-O61
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE./
SHUT DOWN OF VAPOR A-C-061
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO SE
RETURNED TO NORMAL
OPERATIONS AS 800N
AS POSSIBLE./
•
I .c1
I
l'i.u.u.d 1:. rq.tiwi .1111 11.11( , l
4'unui��
LrIUInt ('1
f)c,wr, rnp-
12/23/2007 17.01 AM 1
7 11:50
1224/2007 12:01 AM 122412007 1119 PM 1160
ANNA PLATFORM Continued
1150 Y FREE WATER KNOCK OPERATIONAL UNSCHEDULED
OUT AND TANK MAINTENANCE
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT,
RESULTING IN
EXCESS FLARING
Y FREE WATER KNOCK OPERATIONAL UNSCHEDULED
OUT AND TANK MAINTENANCE
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT.
RESULTING IN
EXCESS FLARING./
Page 12 of 18
Excess Flare Report
Month: December Year. 2007
OAS
COMPRESSOR
REPLACEMENT
PROJECT./
GAS
COMPRESSOR
REPLACEMENT
PROJECT./
SHUT DOWN OF VAPOR A-C-061
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE.'
SHUT DOWN OF VAPOR A -0.061
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE./
U,r1 -
I , T
]T. 1,41
1 i'1_urncti D „xigrron ul int,wera C, .:IC y.,�y.
OPERA 10
ktr Tsui)
UNSCHEDULED GAS
T 40 to
Miinuli.a Fyuq�n u.n
HOJCLbrre nee
A ,.uo n:, Lik
SHUT DOWN OF VAPOR A-
Down MP•
1212512007 1201 AM 1
7 11:59 PM 1 50
ANNA PLATFORM Continued
Y FREE WATER KNOCK
OUT AND TANK
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT,
RESULTING IN
EXCESS FLARING.'
12282007 12:01 AM 12282007 11:59 PM 1150 Y FREE WATER KNOCK OPERATIONAL
OUT AND TANK
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT,
RESULTING IN
EXCESS FLARING.'
Page 13 of 19
Excess Flare Report
Month: December Year. 2007
MAINTENANCE
UNSCHEDULED
MAINTENANCE
COMPRESSOR
REPLACEMENT
PROJECT.)
GAS
COMPRESSOR
REPLACEMENT
PROJECT.'
1
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE.'
SHUT DOWN OF VAPOR A
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO SE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE.)
B. o tv LBO
12/2 12007 12:01 AM 1 720'7 11: r '
12/29/200712:01 AM 12282007 11:69 PM 1160
ANNA PLATFORM Continued
1150 Y FREE WATER KNOCK
OUT AND TANK
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT.
RESULTING 04
EXCESS FLARING./
Page 14 of 19
Excess Flare Report
Month: December Year. 2007
ra:f'
1.1111 1 D. - sr rgrto,111 of Int idmtl Ca0..tjot Itr.uon
•' ' • '11
Slim,
11111ri F — 1'
Hrncr ur mr,cc
i�r 111111', .1{0 11
t-tpuitinett
I j.vn MP.
Y FREE WATER KNOCK OPERATIONAL UNSCHEDULED
OUT AND TANK MAINTENANCE
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT.
RESULTING IN
EXCESS FLARING.'
UNSCHEDULED GAS
COMPRESSOR
REPLACEMENT
PROJECT.%
MAINTENANCE
GAS
COMPRESSOR
REPLACEMENT
PROJECT.
SHUT DOWN OF VAPOR A.C.061
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE.%
SHUT DOWN OF VAPOR A
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE.'
12/29/2007 2:01 AM 12/2 • ' ' 7 11: - ' P 11
12130200712:01 AM 12/30/200711:59 PM 1150
ANNA PLATFORM Continued
Page 15 of 19
Excess Flare Report
Month: December Year. 2007
„ •
srr T.4.1 L.
urtinc
rvlulnu v�.
.d, a
Equiviiion
Down rym-
Y FREE WATER KNOCK OPERATIONAL UNSCHEDULED
OUT AND TANK MAINTENANCE
VAPOR RECOVERY
0141TS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT.
RESULTING 114
EXCESS FLARING./
Y FREE WATER KNOCK OPERATIONAL UNSCHEDULED
OUT AND TANK MAINTENANCE
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT.
RESULTING IN
EXCESS FLARING./
GAS
COMPRESSOR
REPLACEMENT
PROJECT./
GAS
COMPRESSOR
REPLACEMENT
PROJECT./
SHUT DOWN OF VAPOR A -0.061
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE./
SHUT DOWN OF VAPOR A.C.-051
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EOUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE./
ANNA PLATFORM Continued
I;.r: K lit
i nU t :l.i' Pl.m: - , 1_d f,. ,rn ptirn nI Inr Mild C:41(
SII ps L,4 en'n
01i,nn 2
Rres6111(CI}Ce
/'. ton; 1.lkh
1).J :•1,1 MP-
�l 1)111
12/31/2007 1701 AM 1 1/2007 11:59 PM 1150
Y FREE WATER KNOCK
OUT ANO TANK
VAPOR RECOVERY
UNITS LEFT SHUT
DOWN AFTER
MECHANICAL
FAILURE FOR
PLANNED
COMPRESSOR
REPLACEMENT,
RESULTING IN
EXCESS FIARING.I
x'1 1 1,7/0e
Page 16 of 19
Excess Flare Report
Month: December Year: 2007
ONAL UNSCHEDULED GAS
MAINTENANCE COMPRESSOR
REPLACEMENT
PROJECT.;
SHUT DOWN OF VAPOR
RECOVERY UNITS AND
GAS COMPRESSORS
NECESSARY TO
PERFORM
MAINTENANCE.
PERFORMING
INSTALLATION OF NEW
VAPOR RECOVERY UNIT
AND GAS COMPRESSOR.
EQUIPMENT TO BE
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE./
A-C-061