Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutGP Anna Platform / UnocalSTATE OF ALASKA AOGCC GAS DISPOSITION FILES YEAR: 2007 FACILITY: GP Anna Platform OPERATOR: UNOCAL 1. Facility Number 1330000005 2. Facility Narne ANNA PLATFORM 3. Field GRANITE POINT 4. Operator UNOCAL ALASKA 5. Month/Year of Disposition January -07 Disposition Volume MGF 20. Fo production from multiple pools, list conofbuUOn of each pool as a percent of Total Volume. 8. Sold Q Pool Name Pool Code Percent 7. Reinjected 18742 280150 100.00% 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see Instr.) 0 10. Pilot end Purge 217 11. Used for lease operations (specify In Remarks) 24.841 12. Other (see Instructions) Q Auihonzation >1 hr. Safety MCI' 13. TOTAL VOLUME (rTEMS 6.12) 25,058 Lease Use MCF 14. NGL Gas Equivalent Q Conservation MCI' 15. Purchased gas 3,396 waste: MCF 16. Transferred from: 0 17. Transferred to: (Express as a negative #) (951) Commissioner Date 18. Remarks: Transferred From: Bruce Platform Transferred To: GPTF -LEX GPTF -AB Brace Platform 0 0 (951) 0 I hereby Certify that the foregoing is true and correct to be best of my knowledge. �/� J1 ILL Signature (' (Gtn�✓J ! 71. �1n�L .w-- Tito Production Accountant Note: Al! volumes must be corrected to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Mary Indihar Phone 713 -432$238 Date February 16, 2007 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Form 10-422 Rev. 2/2004 INSTRUCTIONS ON REVERSE SIDE Submit In Duplicate 1. Facility Number 1330000005 2. Facility Name ANNA PLATFORM 3. Field GRANITE POINT 4. Operator UNOCAL ALASKA 5. Month/Year of Disposition February-07 Meech pool as a percent of Disposition Volume MCF 20. For production from multiple pools, list contribution Total Volume. 6. Sol Q Pool Name Pool Code Percent 7. Reinjected 0 18742 280150 100.00% 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see Instr.) 0 10. Pilot and Purge 196 11. Used for lease operations (specify M Remarks) 24,176 12. Other (see Mstructlons) Q Authorization >1 hr, Safety MCF 13. TOTAL VOLUME (ITEMS 6 -12) 24.372 Lease Use MCF 14. NGL Gas Equivalent Q Conservation MCF 15. Purchased gas 2,997 Waste: MCF 16. Transferred from: 0 17. Transferred to: (Express as a negative #) (3,669) Commissioner Date 18. Remarks: Transferred From: Bruce Platform 0 Transferred To: GPTF -LEX (1.256) GPTF -AB (2.4!3) Bruce Platform 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. y�� Q Q Signature i ' I �Jr7� tv� U�++— Title Produetlon Accountant Note: All volumes must be corrected to pressure of 14.65 psia and 0 a temperature of 60o F. Authority 20 AAC25.235. Printed Name Mary IndMar Phone 713-43241238 Date March 12, 2007 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION TY REPORT OF PRODUCED GAS DISPOSITION 1, Facility Number 1330000005 2. Facility Name ANNA PLATFORM 3. Field GRANITE POINT 4, Operate( UNOCAL ALASKA 5. Month/Year of Disposition March -07 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 18742 280150 100.00% 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instil 0 10. Pilot and Purge 217 11. Used for lease operations (specify in Remarks) 27,139 12. Otter (see instructions) 0 Authorizations hr. Safety 13. TOTAL VOLUME (ITEMS 6-12) 27,356 Lease Use MCF 14. NGL Gas Equivalent 0 Conservation MCF 15. Purchased gas 4,691 Waste: MCF 16. Transferred from: 0 17. Transferred to: (Express as a negative #) (6,088) CommisaIoner Date 18. Remarks: Transferred From: Bruce Platform Transferred To: GPTF -LEX GPTF -AB Bruce Platform 0 - (3,035) (3.054) 0 I hereby certify that the foregoing is we and correct to the best of my knowledge. I , / Signature �/ ,� u %.. l / - - Panted Name Mary Indihar Title Proeuetion Accountant Note: All volumes must be corrected to pressure of 14.65 Asia and to a temperature of 60o F. Authority 20 AAC25.235. Phone 713-432 -6238 Date April 17, 2007 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION ILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1330000005 2. Facility Name ANNA PLATFORM 3. Field GRANITE POINT 4. Operator UNOCAL ALASKA 5. Month/Year of Disposition AprII -07 Disposition Volume MCF \ 20. For production from multiple pools, list contribution of each pod as a percent of , Total Vow/um. 6. Sob 0 Pool Name Pool Code Percent 7. Reinjected 18742 280150 100.0018 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 305 10. Piot and Purge 210 11. Used for lease operations (specify In Remarks) 25,956 12. Other (see instructions) 0 Authorization >1 hr. Safety. X MCF 13. TOTAL VOLUME (ITEMS 8 -12) 26,471'F Lease Use 14. NGL Gas Equivalent 0 Conservation MCF 15. Purchased gas 3,107 Waste: MC 18. Transferred from: 0 / - 14 ( // 9t11 i _3 - 0 7 li'�9 �* 17. Transferred to: (Express as a negative k) (6.744) Commissioner Deb saioner 18. Remarks: Transferred From: Bruce Platform Transferred To: GPTF -LEX GPTF.AB Bruce Platform 0 ( (2.747) 0 I hereby certify that the foregoing is true and correct Signature \ % g / t l f (' ( / to the test of my knowledge. Title Production Accountant Note: All volumes must be whetted t0 pressure of 14.65 psis and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Mary Mather Phone 713 -432.8238 Date May 15, 2007 Form 10-422 Rev. 22004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION INSTRUCTIONS ON REVERSE SIDE Submit In pupilage UNOCAL Alas Date d Time Event login End Gas MCF planned Detcrlptlon of Incident Category Reason Steps Taken to Minimize Reoccurrence Actions Taken Egwpmen• Down MP- 04/04/2007 05:30 AM 04/04/2007 07:50 PM 305 Y Maint. on Gas compressor ANNA PLATFORM Page 1 of 4 Excess Flare Report OPERATIONAL SCHEDULED MAINTENANCE Month: April Year: 2007 N/A / t1 0 /4 N/A 1. Facility Number 1330000005 2. Facility Name ANNA PLATFORM 3. Field GRANITE POINT 4. Operator UNOCAL ALASKA 5. MomtWear of Disposition May -07 Disposition Volume MCF N. 20. For production from multiple pools, fist contribution ofeacb pool as a percent of Total Volume. 6. Sold D Pool Name Pool Code Percent 7. Rein)ected 0 18742 280150 100.00% 8. Flared or vented 1 hour or lass 0 9. Flared or vented more than 1 hour (see Instr.) 464 10. Pilot and Purge 217 11. Used for lease operations (specify In Remarks) 21 Authorization >1 br: platy � 4 MCF 12. Other (see instructions) D 13. TOTAL VOLUME (ITEMS S 8.12) RECEIVED 21,872 Lease Use MCF 14. NGL Gas Equivalent JUN 9 9 7007 0 Conservation MCF 15. Purchased gas .. ... .. .. 8,271 Waste: MCF 16. Transferred (tom: AI1ChOf� 0 14167-9 Commissioner ,_ 24 - 0 7 17. Transferred to: (Express as a negative s) (966) Date 18. Remarks; Transferred From: Bruce Platform Transferred To: GPTF-LEX GPCF - AB Bruce Platform 0 0 (mil 0 I hereby certify that the foregoing S true and Signature Wide, � nYt- correct to the best of my knowledge. / / //( rg.L -- Title Production Accountant Note: All volumes must be corrected to pressure of 1465 psis and to a temperature of 60o F. Authority 20 AAC25.235. ( I Printed Name Mary Indihar Phone 7134324238 Date June 19, 2007 ATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT t F PRODUCED GAS DISPOSITION Form 10-422 Rev. 2/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate Chevron N INO Begin Dale & Time End Event Gas MCF Planned Description of Incident Category Reason Steps Taken to Minimize Reoccurrence Actions Taken Equipmen Down MP- 05/04/2007 10.15 PM 05/04/2007 11.59 PM 3 Y FREE WATER KNOCK OUT VAPOR RECOVERY UNIT WENT DOWN DUE TO LOW SUCTION.' 05/06/2007 12:00 AM 05/06/2007 11:59 PM 32 N FREE WATER KNOCK OUT VAPOR RECOVERY UNIT SHUT DOWN DUE TO MECHANICAL FAILURE.! ANNA PLATFORM Page 1 of 10 OPERATIONAL Excess Flare Report Month: May Yaar. 2007 OTHER: SEE DESC OF EVENT 05/05/2007 12:01 AM 05/05/2007 11:59 PM 38 N FREE WATER KNOCK OPERATIONAL UNSCHEDULED OUT VAPOR . _ ' MAINTENANCE RECOVERY UNIT SHUT DOWN DUE TO • MECHANICAL FAILURE.' . OPERATIONAL TROUBLESHOO MAINTENANCE TING AND MAINTENANCE! UNSCHEDULED �]!A /fir 7 TROUBLESHOO TING AND MAINTENANCE.' TROUSLESHOO, TING AND ' MAINTENANOE.Iz SHUT DOWN OF VAPOR A- C-051i RECOVERY UNIT NECESSARY TO PERFORM TROUBLESHOOTING AND MAINTENANCE. AWAITING MAINTENANCE TO DISCOVER PROBLEM. WILL RETURN EQUIPMENT TO NORMAL OPERATIONS AS SOON AS POSSIBLE.' SHUT DOWN OF VAPOR ACOS1 RECOVERY UNIT NECESSARY TO PERFORM TROUBLESHOOTING AND MAINTENANCE. EQUIPMENT WILL SE RETURNED TO NORMAL. OPERATIONS AS SOON AS POSSIBLE! SHUT DOWN OF VAPOR A- 0-051 RECOVERY UNIT NECESSARY TO PERFORM TROUBLESHOOTING AND MAINTENANCE. UNIT TORE OUT AND SENT TO SHOP FOR REPAIRS. EQUIPMENT WILL BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.' Chevron R IO 05107/2007 12:01 AM 05/07/2007 11;59 PM 29 N FREE WATER KNOCK OUT VAPOR RECOVERY UNIT SHUT DOWN DUE TO MECHANICAL FAILURE. / 0510812007 12.01 AM 05/08/2007 11:59 PM 24 N FREE WATER KNOCK OUT VAPOR RECOVERY UNIT SHUT DOWN DUE TO MECHANICAL FAILURE./ ANNA PLATFORM Continued Page 2 of 10 OPERATIONAL OPERATIONAL Excess Flare Report Month: May Year: 2007 Begin Date a Time End Event Gas MCF Planned Description of Incident Category Reason Steps Taken to Minimize Reoccurrence Actions Taken Equipmen Down OP- UNSCHEDULED MAINTENANCE UNSCHEDULED MAINTENANCE TROUBLESHOO TING AND MAINTENANCE./ TROUBLESHOO TING AND MAINTENANCE./ A-C 051i SHUT DOWN OF VAPOR RECOVERY UNIT NECESSARY TO PERFORM TROUBLESHOOTING AND MAINTENANCE. UNIT TORE OUT AND SENT TO SHOP FOR REPAIRS. EQUIPMENT W ILL BE RETURNED TO t NORMAL OPERATIONS AS SOON AS POSSIBLE./ SHUT DOWN OF VAPOR AC 051' RECOVERY UNIT NECESSARY TO PERFORM TROUBLESHOOTING AND MAINTENANCE. UNIT TORE OUT AND SENT TO SHOP FOR REPAIRS. EQUIPMENT WILL BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE./ Ch evron ANNA PLATFORM Continued Excess Flare Report Month: May Year 2007 Begin Date 8 Time End Event Gas MCF Planned Description of Incident Reason Steps Taken to Minimize Reoccurrence Actions Taken Equipmen Dawn MP -. 05/09/2007 12:01 AM 05/09/2007 11:59 PM Category 29 N. „ FREE WATER KNOCK . OPERATIONAL _ UNSCHEDULED ;--,- OUT VAPOR r • � -� : = 7 MAINTENANCE, RECOVERY UNIT • - ` "< - TROUBLESHtxI. TING AND MAINTENANCE.'" SHUT DOWN DUE TO MECHANICAL : - - ` =';; - #;... •. - FAILURE",;, 05/10/2007 1291 AM 05/10/2007 11:59 PM 29 N FREE WATER KNOCK OPERATIONAL OUT VAPOR RECOVERY UNIT SHUT DOWN DUE TO MECHANICAL FAILURE.' Page 3 of 10 UNSCHEDULED TROUBLESHOO MAINTENANCE TING AND MAINTENANCE./ SHUT DOWN OF VAPOR .... A-C-051' RECOVERY. UNIT ' NECESSARY TO '. PERFORM TROUBLESHOOTING AND MAINTENANCE. UNIT TORE OUT AND SENT TO SHOP FOR REPAIRS. EQUIPMENT MALL BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE. SHUT DOWN OF VAPOR A - C - 051i RECOVERY UNIT NECESSARY TO PERFORM TROUBLESHOOTING AND MAINTENANCE. UNIT TORE OUT AND SENT TO SHOP FOR REPAIRS. EQUIPMENT VWLL BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.' Chevron Nero 05111/2007 12.01 AM 05111/2007 11:59 PM 05112/2007 12:01 AM 05/12/200711:59 PM 29 . ANNA PLATFORM Continued , FREE WATER KNOCK OUT VAPOR '- RECOVERY UNIT SHUT GOWN DUE TO MECHANICAL ' FAILURE.) • FREE WATER KNOCK OUT VAPOR RECOVERY UNIT SHUT DOWN DUE TO MECHANICAL FAILURE.) Page 4 of 10 Excess Flare Report Month: May Year. 2007 Begin Date & Time End Event Gas MCF planned Description of Incident Category Reason Steps Taken to Minimize Reoccurrence Actions Taken Equipmen Down MP- OPERATIONAL UNSCHEDULED yY MAINTENANCE w ) iii YP r - OPERATIONAL UNSCHEDULED MAINTENANCE TROUBLESHOOT TING AND , MAINTENANCE. /!*! TROUBLESHOO TING AND MAINTENANCE./ SHUT DOWN OF VAPOR A- 0.0511 RECOVERY UNIT ... NECESSARY TO PERFORM TROUBLESHOOTING AND MAINTENANCE. UNIT TORE OUT AND SENT TO SHOP FOR REPAIRS. EQUIPMENT WILL BE RETURNED TO NORMAL OPERATIONS AS SOON M POSSIBLE.) . SHUT DOWN OF VAPOR A-C-0Sh RECOVERY UNIT NECESSARY TO PERFORM TROUBLESHOOTING AND MAINTENANCE. UNIT TORE OUT AND SENT TO SHOP FOR REPAIRS. EQUIPMENT WILL BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE./ Chevron ANNA PLATFORM Continued Date IL Time Begin End Event Gas MCP Planned Description of Incident Category Reason Steps Taken to Minimize Reoccurrence Actions Taken Equipmen Down MP- 05/132007 1201 AM 05/13/2007 11:59 PM 29 FREE WATER KNOCK r OUT VAPOR RECOVERY UNIT SHUT DOWN DUE TO FAILURE.' r. i + -' 05/142007 12:01 AM 05/14/2007 11 X59 PM 28 N FREE WATER KNOCK OPERATIONAL OUT VAPOR RECOVERY UNIT SHUT DOWN DUE TO MECHANICAL FAILURE./ Page 5 of 10 Excess Flare Report Month: May Year 2007 OPERATIONAL, UNSCHEDULED - -, TROUBLESHOO. MAINTENANCE -y :TING AND Y -� r MAINTENANCE4, UNSCHEDULED TROUBLSHOO TING AND MAINTENANCE.' MAINTENANCE UT DOWN OF VAPOR AC•511 RECOVERY UNIT NECESSARY TO.. PERFORM TROUBLESHOOTING AND MAINTENANCE. UNIT TORE OUT AND SENT TO SHOP FOR REPAIRS. EQUIPMENT WILL BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.' SHUT DOWN OF VAPOR AC -054 RECOVERY UNIT NECESSARY TO PERFORM TROUBLESHOOTING AND MAINTENANCE. UNIT TORE OUT AND SENT TO SHOP FOR REPAIRS. EQUIPMENT WILL BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.' Chevron ROO IWO Begin Date & Time End Event Gas MCF Planned Desciiptlon of Incident Category Reason Steps Taken to Minimize Reoccurrence Actions Taken EquipMen Down MP- 05/15/2007 12.01 A61 05/15/2007 11:59 PM 28 0511612007 12:01 AM 05116/2007 11:59 PM 28 N FREE WATER KNOCK OUT VAPOR RECOVERY UNR SHUT GOWN DUE TO MECHANICAL FAILURE.' ANNA PLATFORM Continued FREE WATER KNOCK-„.. OPERATIONAL UNSCHEDULED OUT VAPOR t.. .:.� .. _. MAINTENANCE RECOVERY UNIT - SHUT DOWN DUE TO MECHANICAL c �.__. '!r FAILURE.' _ .. Page 6 of 10 Excess Flare Report OPERATIONAL UNSCHEDULED MAINTENANCE Month: May Year: 2007 TROUBLESHOO TING AND ' MAINTENANCE.' n52••.. -� - ' A TROURLESHOO TING AND MAINTENANCE.' SHUT DOWN OF VAPOR RECOVERY UNIT ,. NECESSARY TO PERFORM TROUBLESHOOTING AND MAINTENANCE. UNIT TORE OUT AND SENT TO SHOP FOR REPAIRS. EQUIPMENT VMLL BE RETURNED TO NORMAI. OPERATIONS AS SOON AS POSSIBLE.' SHUT DOWN OF VAPOR A -C-061 RECOVERY UNIT NECESSARY TO PERFORM TROUBLESHOOTING AND MAINTENANCE. UNIT TORE CUT AND SENT TO SHOP FOR REPAIRS. EQUIPMENT WILL BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.' • A -C-05U Chevron 05/17/2007 12:01 AM 05/17/2007 11:59 PM 28 05/18/2007 12:01 AM 05/18/2007 11:59 PM 29 N FREE WATER KNOCK OUT VAPOR RECOVERY UNIT SHUT DOWN DUE TO MECHANICAL FAILURE' ANNA PLATFORM Continued Page 7 of 10 Excess Flare Report Begin Date 8 Time End Event Gas MCF Planned Description of Incident Category Reason Steps Taken to Minimize Reoccurrence Actions Taken Equiprnen Down MP- N FREE WATER KNOCK OPERATIONAL_. UNSCHEDULED OUT VAPOR _ MAINTENANC&. RECOVERY UNIT SHUT DOWN DUE TO MECHANICAL- . 'tea• _. - OPERATIONAL UNSCHEDULED Month: May Year: 2007 TROUBLESHOO T1NG AND MAINTENANCE.' TROUBLESHOO MAINTENANCE TING AND MAINTENANCE.' SHUT DOWN OF VAPOR A-C 051. RECOVERY UNIT NECESSARY TO PERFORM TROUBLESHOOTING r . AND MAINTENANCE. ti1.' UNIT TORE OUT AND SENT TO SHOP FOR REPAIRS. EQUIPMENT .. WILL BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.' SHUT DOWN OF VAPOR A -C-051' RECOVERY UNIT NECESSARY TO PERFORM TROUBLESHOOTING AND MAINTENANCE. UNIT TORE OUT AND SENT TO SHOP FOR REPAIRS. EOUIPMENT WILL BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.' Chevron I WO Begin Date d Time End Event Gas MCF Planned Description of Incident Category Reason Steps Taken to Minimize Reoccurrence Actions Taken Equiprnen Down MP- 05/19/2007 12:00 AM 05/19/2007 11:59 PM 27 ANNA PLATFORM Continued FREE WATER KNOCK OPERATIONAL OUT VAPOR Ai ... RECOVERY UNIT SHUT DOWN DUE TO MECHANICAL - FAILURE". 05/20/2007 12:01 AM 05/20/2007 11 59 PM 20 N FREE WATER KNOCK OUT VAPOR RECOVERY UNIT SHUT DOWN DUE TO MECHANICAL FAILURE./ FWKNVRU Repaired and bade on One. Page 8 of 10 OPERATIONAL Excess Flare Report Month: May Year 2007 UNSCHEDULED MAINTENANCE UNSCHEDULED MAINTENANCE TROUBLESHOO., . TING AND MAINTENANCE.(4 : REPLACED ROTOR BEARINGS.' SHUT DOWN OF VAPOR A-C-051i RECOVERY UNIT - NECESSARY TO PERFORM TROUBLESHOOTING AND MAINTENANCE. UNIT TORE OUT AND SENT TO SHOP FOR REPAIRS. EQUIPMENT WILL BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.' SHUT DOWN OF VAPOR RECOVERY UNIT NECESSARY TO PERFORM TROUBLESHOOTING AND MAINTENANCE. ROTOR BEARINGS WERE REPLACED AND SENT BACK TO PLATFORM. EQUIPMENT WAS PLACED BACK INTO SERVICE./ AC -0511 Form 10-422 Rev. 2/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 5. Month/Um of Disposition 1. Facility Number 1330000005 2. Facility Name ANNA PLATFORM ONpoaltbn 6. S010 7. Reinjected 8. Flared or vented 1 how or less 9. Flared or vented mare than 1 haw (see InMI' ) 10. Pilot and Purge 11. Used for base operations (specify In Remarks) 12. Other (see instructions) 13. TOTAL VOLUME (ITEMS a- 1RECEIVEL7 14. NGL Gas Equivalent JUL 2 3 2np7 17. Transferred to: (Express as e negative e) 18. Remarks: Transferred From: Bruce Platform Transferred To: GPTF -LEX GPTF -AB Bruce Platform 3. Field GRANITE POINT Volut* MCF 0 0 0 210 21,686 0 22.096 0 0 0 (6,274) (4,067) (2207) 0 4. Operator UNOCAL ALASKA 20. For production from multiple pools. lest conbPoutlon of each Peeler • Want d TOWN Vdh/ma. 0 Pool Name 18742 Waste: Commissioner I hereby certify that the foregoing is true and cad to the best of my knowledge. rn ., .-- Printed Name Mary YgMar Signature Title Production Accountant Phone 7134324238 Date July 16, 2007 June -07 Pod Code 280150 Authorization >1 hr: Safety Leese Use Conservation MCF MCF MCF Date Percent 100.00% MCF Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 600 F. Authority 20 AAC25.235. INSTRUCTIONS ON REVERSE SIDE Submit In Dupllnte 1. Facility Number 1330000005 2. Facility Name ANNA PLATFORM . Field GRANITE POINT 4. Operator UNOCAL ALA$KA 5, Month Year of Disposition July-07 Disposition Volume MCF 1 ` \ 20. For production hem mWOple pools, Mat contribution of each pool as • percent of Tow Vokma. 8. Sold 0 Pool Name Pool Coda Percent 7. Reinjected 0 18742 280150 100.00% 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see Instr.) 2,048 10. Pilot and Purge 218 11. Used for lease operations (specify in Remarks) 23,663 12. Other (see instructions) 0 Authorization v1 hr. Safety u1 ZrO r+ MCF ., 13. TOTAL VOLUME (ITEMS 8.12) 25,929 Lease the MCF 14. NGL Gas Equivalent 0 Conservation MCF 15. Purchased gas 4,437 Waste: MCF 18. Transferred from: o 114,-;4! /J � ?6'— 9 //- 0 7 17. Transferred to: (Express as a negative e) (4,105) CannSaioner Date 15. Remarks: Transferred From: Bruce Platform Transferred To: GPTF -LEX GPTF -AB Bruce Platform 0 (2,497) (1,805) 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. /� // Signature p 2H 1 �[SL /�. tC. rasa Production Accountant Not: All volumes must be corroded Note: pressure of 14.65 psis end to a temperature of 60o F. Authority 20 AAC25.235. t / Printed Name Mary Indlhar Phone 7134324238 Date August 13, 2007 Form 10-422 Rev. 2/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION ' REPORT I = PRODUCED GAS DISPOSITION INSTRUCTIONS ON REVERSE SIDE Subml In Duplicate two Dale 8 Time End Event Gas MCF Plannc d Doscnption oI Inc de nl Category Reason Sl T.ikcn to M1L a nni:, Re nec urrence Actions Takeo Eguipmen Down MP -' . Begin 07106/2007 04A5 AM 0710612007 11.59 PM 44 0 7107 /2 0 07 12:00 AM 07/072007 11:69 PM - 61 4. 07/06/2007 12:00 AM 07/062001 11:59 PM 54 N FREEWATER KNOCKOUT VAPOR RECOVERY UNIT SHUT DOWN DUE TO MECHANICAL FAILURE, RESULTING IN FXCESS FLARING.' F,REEWATER" .INbCIST VAPQRK RECOVERY UNIT ='SHUT DOWN DUE TO . MECHANICAL • EAI1yRE, RESULTINg IN .. eas.FLARING.' a - FREEWATER KNOCKOUT VAPOR RECOVERY UNIT SHUT DOWN DUE TO MECHANICAL FAILURE, RESULTING IN EXCESS FLARING.' ANNA PLATFORM OPERATIONAL Page 1 of 8 oPwIj/1 OPERATIONAL 07109/200712:00 AM. 07109/200711 59 PM R f 81 % r N „ FREE - ofERA, TIO.1y* it Y i S T • : KNOCKOUTUAPORt4 ' = -? .. RECOVERY UNIT •. C.. SHUT DOWN OUEla 1 MECHAN C $ FAILURE, RESULTING IN EXCESS FLAINN61 ;_ Excess Flare Report Montle July YMr. 2007 UNSCHEDULED MAINTENANCE u+� b�t•1e UNSCHEDULED MAINTENANCE TROUBLESHOO TING AND REPAIRS.' TROUSLESHOO TING AND REPAIRS.' SHUT DOWN OF VAPOR A•G451' RECOVERY UNIT NECESSARY TO PERFORM TROUBLESHOOTING AND REPAIRS. UNABLE TO FIX PROBLEM, SENT TO SHOP FOR REPAIRS.' aII f T 4OW N OF VAPOR *4-061 RY UNIT CESSARYTO PERFORM *OVERSHOOTING MO REPAIRS. UNABLE x -- T9 KIX PROBLEM, sea TO SHOP FORREPMRS.I SHUT DOWN OF VAPOR AC-051 RECOVERY UNIT NECESSARY TO PERFORM TROUBLESHOOTING AND REPAIRS. UNABLE TO FIX PROBLEM, SENT TO SHOP FOR REPAIRS.' • $}{t1T DOWNOP VAPOR RECOVERY UNR UESSAR YTO p kRR FORM TROUOLBSHOO:ANb AP1D REPAI tL UNABLE .. tTO POEPR0eLEM, SENT }O' SHOP FO!!l:NEPAIRB.I'. A'CASL ther" Date S. Iinm End Event Gan MCF Plannc - d Dos ri ntmn of Inadent Categorl P,ra,on St. yt T.,',..n to Minimize Ronrcurrenr Acn .n- Talon Eguittnen. Doan LIP- 07/10/2007 1200 AM 07/1012007 11:59 PM . 07/111200712:00 AM: 07/11/2007 11:59 PM'....,:. 1 07/12/200712.00 AM 07112/2007 11:59 PM 88 N 206 ANNA PLATFORM Continued FREEWATER KNOCKOUT VAPOR RECOVERY UNIT SHUT DOWN DUE TO MECHANICAL FAILURE, RESULTING IN EXCESS FLARING.' " ktErta41.4 OPERAnO OutVAPO[R 'tv UNf' . n WW Dug 19 ,`` MECHANICAL ...., - PA¢URE, RESULTING , : : <y IN FRGF F'.A81NO'.' =E= mow } i .. • FREEWATER KNOCKOUT VAPOR RECOVERY UNIT SHUT DOWN DUE TO MECHANICAL FAILURE, RESULTING IN EXCESS RARING.' Page 2 of 8 OPERATIONAL Excess Flare Report Month: July Year, 2007 OPERATIONAL UNSCHEDULED TROUBLESHOO MAN TENANCE TING AND REPAIt8.' UNSCHEDULED MAINTENANCE TROUBLESHOO TING AND REPAIRS.' SHUT DOWN OF VAPOR AC-0514 RECOVERY UNIT NECESSARY TO PERFORM TROUBLESHOOTING AND REPAIRS. UNABLE TO FIX PROBLEM, SENT TO SHOP FOR REPAIRS.' tlttAlve P YAPORt ` :: /41Ni ka frr TO. SM: esei !HOOTING: WETS NEW INO. WAITING fi'f7 PARTS TO BE (RIPPED.' SHUT DOWN OF VAPOR A-C-061' RECOVERY UNIT NECESSARY TO PERFORM TROUBLESHOOTING AND REPAIRS. BEARINGS NEED REPLACING. WAITING ON PARTS TO BE SHIPPED.' Area-0611 ANNA PLATFORM Continued Begin Dale 8 Tillie 1ycnt Gas MCF PI.anno BesC,nptton of InCUle,rt Category Str_p°. ta to Mimnn: Reuccn Actnm_ Rilen a- Egtiipmmn Dorn MP. OYl131200712:00 11 :9 07/14/2007 12:00 AM 07/14/2007 11:59 PM 191 N FREEWATER OPERATIONAL UNSCHEDULED KNOCKOUT VAPOR MAINTENANCE RECOVERY UNIT SHUT DOWN DUE TO MECHANICAL FAILURE, RESULTING IN EXCESS FLARING., 07115/200712:00 AM 07/15/200711:59 PM: 212 a: N'T' FREEWATER ' , OPERA NiO VAP9RE � ethtn D01thI tHANICAL . FAN.URE; RESULTING IFiE : C. Page 3 of 8 Excess Flare Report Month: July Year. 2007 0 *soc i1NGM ; REpMIIRS. INQS NEED ING, WAITING ART9109 .. TROUBLESHOO SHUT DOWN OF VAPOR TWO AND RECOVERY UNIT REPAIRS., NECESSARY TO PERFORM TROUBLESHOOTING AND REPAIRS. BEARINGS NEED REPLACING, WAn1N0 ON PARTS TO BE SHIPPED, DOWN OF VAPOR. N66611 Ma Y eiegekoOnno O WONDS NEED 1NG WAITING 1110fARTS TO 86; MC-O51. Begin Date & Time End Event Gas • M■F Planne d C e r rg,tmn of Inc idcnf Category Hra Han< // /lice Act. .n, T c..n E D MP- 07116/2007 1200 AM 07116/2007 11 :59 PM 07/17/2007 12:00 AM 07/17/2007 11:59 PM,- €. 1 _ . 07/1802007 12:00 AM 07/18/2007 11:59 PM 118 204 N FREEWATER KNOCKOUT VAPOR RECOVERY UNIT SHUT DOWN DUE TO MECHANICAL FAILURE, RESULTING IN EXCESS FLARING.' ANNA PLATFORM Continued OPERATIONAL UNSCHEDULED FREEWA7 R . , . t : OP E RA TOONAI;; KNOCKO'J[ VAPOR OCOVSUNIT /Art D0* MEctUUJICAI. ,` 4 5 FAILURE RESULTING . ii EXCESS ING I1 . 4 Page 4 of 8 FREEWATER OPERATIONAL KNOCKOUT VAPOR RECOVERY UNR SHUT DOWN DUE TO MECHANICAL FAILURE, RESULTING IN EXCESS FLARING.' Excess Flare Report Month: July Year: 2007 MAINTENANCE TANG AND REPAIRS.' UNSCHEDULED MAINTENANCE TROUBLESHOO TROUBLESHOO TING AND REPAIRS.' SHUT DOWN OF VAPOR AC-0511 RECOVERY UNIT NECESSARY TO PERFORM TROUBLESHOOTING ANO REPAIRS. BEARINGS NEED REPLACING, WAITING ON PARTS TO BE SHIPPED.' Et daMticr VAPOR OJERYkM�IT 1 .�,,, OSAROP.:4,.._ A<5051 ems, WAITING P TO BE PPED.I • SMUT DOWN OF VAPOR AC-051I RECOVERY UNIT NECESSARY TO PERFORM TROUBLESHOOTING AND REPAIRS. BEARINGS NEED REPLACING, WAITING ON PARTS TO BE SHIPPED.' 0720/200712:00 AM 0720/2007 11:59 PM 0721200712:00 AM 0721200711:50 PM 149 d':7"' N 83 N FREEWATER KNOCKOUT VAPOR RECOVERY UNIT SHUT DOWN DUE TO MECHANICAL FAILURE, RESULTING IN EXCESS FLARING./ FREEWAI /c4“.2. acy ANNA PLATFORM Continued Begin Date & Time Evert? Gas MCF Planned Desc+rphon of Incident Category Reason ' f11 t i1. . Steins Tiu 010 Huron C, Reoccurtmrce EQJLpnlrn Down MP. 9200712:00 AM OPERATIONAL UNSCHEDULED QPERATIONAI:•+Na' VAFGR Page 5 of S Excess Flare Report Month: July Year. 2007 TROUBLES:100 MAINTENANCE TING AND REPAIRS., AJ ;(b14.7 ACE AM. nn.14 n � PA& UNIT ;1 VisARY. Tb ; _. SHOOT** .. REPAIRS arReED WRITING PARTS TO BB SHUT DOWN OF VAPOR MC-0S11 RECOVERY LINK NECESSARY TO PERFORM TROUBLESHOOTING ANO REPAIRS. BEARINGS NEED REPLACING. WAITING ON PARTS TO BE SHIPPED., OF VAPOR Arerstil' t. .'toll ,.. - 9 ULE6 t , 445 AND E au NQRMAL S AS.SQAN:.:^ • 11 -.r.; 1. Faceay Number 1330000005 2. Facility Name ANNA PLATFORM 3. Field GRANITE POINT 4. Operator UNOCAL ALASKA 5. Month/Year of Difpoailten August -07 Disposition Volume MCF 20. Forproduction from muNl#d ► pools, fiat contributes? of Imo pool as a more of Toed Volume e. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 18742 280150 100 .^ 8. Flared or vented 1 hour or leas 0 9. Flared or vented more than 1 hour (sae instil 0 10. Plot and Purge 217 11. Used for lope operations (specify In Remarks) 30,387 Authorisation >1 hr. Safety MCF 12. Other (see Instructions) D 13. TOTAL VOLUME (ITEMS 0.12) 30,604 Lease Use 14. NGL Gas EpuNalent 0 Conservation MCF 15. Purchased gas 0 Waste: MCF 15. Tranlaned from: 0 17. Transferred to (Express as a negative # (7,105) Commissioner Date 18. Remarks: Tms/Nred From: Brum Platform 0 Transferred To: OPTF.LEX (5,049) GPTP.AB (2.058) Bruce Platform 0 1 hereby certify that the foregoing is Ira and correct to the best of my knowledge. Signature Title Production Accountant Nob: All volumes must be corroded to pressure of 14.65 psis and to it temperature of 60o F. Authority 20 AAC25.235. Printed Nana Mary lndlhsr Phone 7134324238 Oats September 14, 2007 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Form 10-422 Rev. 2/2004 INSTRUCTIONS ON REVERSE SIDE Submk In Dupeate Form 10-422 Rev. 2/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 5. MonthNear of Disposition 1. Facility Number 1330000005 Disposition 8. Sold 7. Retracted 8. Flared or vented 1 hour or less 9. Flared or vented more than 1 hour (see Instr.) 10. Pilot and Purge 11. Used for base operations (specify Si Remarks) 12. Other (see instructions) 13. TOTAL VOLUME (REMS 6 -12) 14. NGL Gas Equivalent 15. Purchased gas 16. Transferred from: 17. Transferred to: (Express as • negative e) 18. Remarks: Transferred From: Bruce Platform 2. Facility Name ANNA PLATFORM 3. Feld GRANITE POINT Volume MCF 0 0 0 3,244 210 24,650 0 28,104 0 3,882 0 (4,418) Pool Name Pool Code Patent 280150 100.00% 0 Translated To: GPfF -LEX (3,693) GPfF-AB (723) Bruce Platform 0 4. Operator UNOCAL ALASKA 20. For production from multiple pools, list contribution of each pool as • mount of Total Volume 18742 Authorvatbn >1 hr: MCF Seery 3 z44 Lease Use Conservation MCF MCF Waste: Commissioner I hereby certify that the foregoing is true and correct to the best of my knowledge. cyll/742 Printed Name Mary Indihar Signature Title Production Accountant Plane 7134324238 Data October 17, 2007 September -07 MCF nu Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235. INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate Chevron IMO 09/12/2007 10:30 AM 09/12/2007 11:59 PM 09/13/2007 12:01 AM 09/142007 12'.01 AM 09/15/2007 12:01 AM 09/182007 12:01 AM 09/172007 12:00 AM 09/182007 12:01 AM 09/19/2007 12:01 AM 09/20/2007 1201 AM 09/21/2007 12:01 AM 09/22/2007 12:01 AM 0923/200712:01 AM 09/24/2007 12:01 AM 09/252007 12:01 AM \ 09282007 12:01 AM 09272007 12:01 AM 09282007 12:01 AM 24 N 09/13/2007 1 1:59 PM . 123 N ._ 09/14/2007 11:59 PM 119 N 09/152007 11:59 PM 124 N- 09/18/2007 11:59 PM 129 N 09/17/2007 11:59 PM 167 N 09/18/2007 11:59 PM 166 N 09/19/2007 11:59 PM 170 N 09/20/2007 11:59 PM 255 N 09/21/2007 11:59 PM 189 N 09222007 11:59 PM 170 N 0923/200711:59 PM 178 N 09242007 11:59 PM 181 N 09252007 11:59 PM 182 N , 09/26/2007 1159 PM 185 N 09272007 11:59 PM 149 Y 09/28/2007 11:59 PM 266 Y FWKO VRU HIGH VIBRATION. suspect bad bearing. FWKO VRU DOWN. FOR REPAIRS. FWKO DOWN Fwko tau Down FWKO went down high vibration. FWKO VRU down for repairs/replacement FWKO VRU down on high vibration FWKO VRU Down high NbratiOn FNMO VRU down high wbratiOn FNIKO VRU down high vibration FWKO VRU down high vibration FWKO VRU down due to high Vibration FWKO High vibration FWKO VRU down due to high vibration due to high vibration on FWKO VRU high vibration high vibration ANNA PLATFORM Page 1 of 5 OPERATIONAL OPERATIONAL OPERATIONAL OPERATIONAL OPERATIONAL:.• OPERATIONAL OPERATIONAL OPERATIONAL OPERATIONAL OPERATIONAL OPERATIONAL OPERATIONAL OPERATIONAL T OPERATIONAL OPERATIONAL. OPERATIONAL Excess Flare Report Month: September Year. 2007 Begin Date & Time End Event Gas MCF Planned Description of Incident Category Reason Steps Taken to Minimize Reoccurrence Actions T Equipmem Down MP- • OPERATIONAL UNSCHEDULED MAINTENANCE UNSCHEDULED MAINTENANCE UNSCHEDULED MAINTENANCE UNSCHEDULED MAINTENANCE UNSCHEDULED MAINTENANCE UNSCHEDULED MAINTENANCE UNSCHEDULED MAINTENANCE UNSCHEDULED MAINTENANCE UNSCHEDULED MAINTENANCE UNSCHEDULED MAINTENANCE UNSCHEDULED MAINTENANCE UNSCHEDULED UNSCHEDULED MAINTENANCE UNSCHEDULED MAINTENANCE UNSCHEDULED MAINTENANCE UNSCHEDULED MAINTENANCE UNSCHEDULED MAINTENANCE shut down for repairs. shut down vn1's AC-051' AC-051i Down for repairs SHUT DOWN FWKO VRU AC-051r Awaiting repairs. Shut Down. Make repairs to SID Evoke AC-0518 Fuko wU. repair Nato wu. shut down hero vim. A1}0511 repaidreplece re- akhaplace AC Repair/Replace Repair/Replace AC Repair/Replace Repair/Replace AC repair /replace Repair/Replace AC . repai/roplace repair/replace AC-051r repair/replace repair/replace AC -0519 repeirheplece - repaidreplace A -C-051r repair/replace repairrleplace AC-0511 replace/repair replace/repair AC -061/ replace/rspar replaosfapatr AC replace , replace AC-051 replace rice A- Cr051i Chevron Begin End 09/29/2007 11:59 PM - 235 V_. high vibration 09/30/2007 12:01 AM 09/30/2007 11:59 PM 252 Y high vexation . 09/29/2007 12:01 AM got. 3 a 44 ANNA PLATFORM Continued Dale 8 Time Event Gas Steps Taken to Minim 10 Reoccurrence • Actions Taken Equipment Down MP.. MCF Planned Description of Incident Category Reason OPERATIONl1LR, $Cf7EDULED MAINTENANCE OPERATIONAL UNSCHEDULED MAINTENANCE '711Th ' o /!& /07 Page 2of5 Excess Flare Report Month: September Ynr: 2007 replace replace 1. Facility Number 1330000005 2. Facility Name ANNA PLATFORM 3. Field GRANITE POINT 4. Operator UNOCAL ALASKA 5. MontNyear of Disposition October - 07 Disposition Volume MCF 1 20. Forproducfion from mulele pools. fist wnbibulion of each pool es a percent of Total Volume. e Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 18742 280150 100.00% 8. Flared or vented 1 hour or less 0 9 Flared or vented more than 1 hour (see instr.) 18,864 10. Pilot and Purge 217 11. Used for base operations (specify In Remarks) 4,801 Authorization >1 tv. Sa1My o II� (Di `ct� MCF 12. Other (see instructions) 0 13. TOTAL VOLUME (ITEMS 6 23,882 Leas Use MCF 14. NGL Gas Equivalent 0 Conservation MCF 15. Purchased gas 17,939 waste: MCF 18. Transferred from: o l - /i / � o 17. Transferred to: (Express as a negative e) (102) Commissioner 18. Remarks: Transferred From: Bruce Platform Transferred To: GPTF -LEX GPTF -AB Bruce Platform 0 0 (102) 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. W 1 .�1,, Signature , , 1 73 Title Production Accountant Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Mary I ndihar Phone 713 - 4324236 Date November 12, 2007 Form 10-422 Rev. 2/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION INSTRUCTIONS ON REVERSE SIDE Submit In Duplicate Date & Time Event Gas MOE Planned? Description of Incident Category Reason Actions Taken Steps Taken to Minimize ReCurnene' Equipment Down MP-2 ID Number Begin End 101200] 0 01 lOnt2007 2359 N FREE WATER KNOCK OUT AND TANK VAPOR RECOVERY UNITE LEFT SMUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED GAS COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING] OPERATIONAL UNSCHEDULED MAINTENANCE SMUT DOWN OF VAPOR RECOVERY UNITS AND OAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE AND REPLACE WrIN NEW OAS COMPRESSOR. EQUIPMENT ro RETURNED TO NORMAL OPERATIONS AS SOON A8 REPLACING GAS COMPRESSOR.' A40610 1022007 0 01 1001200? n 59 N FREE WATER KNOCK OUT AND TANK VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED OAS COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING] OPERATIONAL UNSCHEDULED MAINTENANCE SMUT DOWN OF VAPOR RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE AND REPLACE WITH NEW GAS COMPRESSOR. EQUIPMENT TO REPLACING GAS COMPRESSOR] A4-0610 RETURNED TO NORMAL OPERATIONS AS SOON AS 10/3/2007 0:01 101/200723:59 N FREE WATER KNOCK OUT AND TANK VAPOR RECOVERY UNITS LEFT SNIFF DOWN AFTER MECHANICAL FAILURE FOR PLANNED GAS COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARNO4 OPERATIONAL UNSCHEDULED MAINTENANCE SHUTDOWN OF VAPOR RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE AND REPLACE WITH NEW GAS COMPRESSOR. BEGAN DEMO OF OLD VRU COMPRESSOR. EQUIPMENT TO BE RETURNED •^ GAS COMPRESSOR NC -0610 REPLACEMENT PROJECT.' /0142007 DOI SOIV2007 23:59 310 N FREE WATER KNOCK OUT ARID TANK VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAKIJRE FOR PLANED GAS COMPRESSOR REPLACEMENT. RESULTING IN EXCESS FLARING] OPERATIONAL UNSCHEDULED MAINTENANCE SHUT DOWN OF VAPOR RECOVERY UNITS AND GAB COMPRESSORS NECESSARY TO PERFORM MAINTENANCE AND REPLACE WITH NEW GAS COMPRESSOR. DEMOLITION OF OLD VAPOR RECOVERY UNIT COMPRESSOR. ... �� GAS COMPRESSOR REPLACEMENT PROJECT.' AC-0610 10/52007 0 1 23.50 A N FREE WATER 104OCK OUT AND TANK VAPOR RECOVERY LJMTS LEFT SMUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED GAS COMPRESSOR REPLACEMENT. RESULTING IN EXCESS FLARING.I OPERATIONAL UNSCHEDULED MAINTENANCE SHUT DOWN OF VAPOR RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE AND REPLACE WITH' NEW GAS COMPRESSOR. DEMOLTION OF OLD VAPOR RECOVERY UNIT COMPRESSOR. GAS COMPRESSOR REPLACEMENT PROJECT.' AC-0610 1GW2007 001 10/12007 23:59 N FREE WATER KNOCK OUT AND TANK VAPOR RECOVERY UNITS LEFT Stan DOWN AFTER MECHANICAL FNLURE FOR PLANNED OAS COMPRESSOR OPERATIONAL OTHER: SEE DESC OF EVENT SMUT GOWN OF VAPOR RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MANTENANCE AND REPLACE WITH NEW GAS COMPRESSOR. DEMOLITION OF OLD VAPOR RECOVERY UNIT COMPRESSOR. COMPRESSOR REPLACEMENT PROJECT] *4.0610 REPLACEMENT, RESULTING 114 EXCESS FLARING] Facility Name: ANNA PLATFORM Report Date: 11/15/2007 1405> AO- Excess Flare Log Report Month/Year: 01-Oct -2007 Page: 1 of 7 Dab & Time Event Gas MCF Planned? Description of Incident Category Reason Actions Taken Steps Taken to Minimize Recurrence Equipment Down MP -2 ID Number , Begin End i0/7/2007 0.01 10n/2W12059 1143 N FREE WATER KNOCK OUT VAPOR RECOVERY UMT 8INT 00WN DUE TO NIGH VIBRATION, RESULTING M EXCESS FLARING.' Gee Capemor don E replan OPERATIONAL OTHER SEE OESC OF EVENT 31207 DOWN OF VAPOR RECOVERY UNITS AND OAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE AND REPLACE WITH NEW GAS COMPRESSOR. DEMOLITION OF OLD VAPOR RECOVERY UMT COMPRESSOR. �w. .......-. OAS COMPRESSOR AC.0610 REPLACEMENT PROJECT.' 1002007 001 10e/2007 23'59 1115 Y FREE WATER KNOCK OUT AND TANK VAPOR RECOVERY UNITS LEFT SMUT DOWN AFTER MECHANICAL FAILURE FOR PLANED COMPRESSOR REPLACEMENT. RESULTING IN EXCESS FLARE/134 OPERATIONAL UNSCHEDULED MAINTENANCE SHUT DOWN VAPOR RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE N40 REPLACE WITH NEW GAS COMPRESSOR. DEMOLITION OF OLD VAPOR RECOVERY UNIT COMPRESSOR. - ✓ � OAS COMPRESSOR A -C-0610 REPLACEMENT PROJECTJ 10x'2007001 10/91200723:59 1143 Y FREE WATER KNOCK OUT AND TANK VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT. RESULTING IN EXCESS FLARING.' OPERATIONAL SCHEDULED MAINTENANCE SHUT DOWN OF VAPOR RECOVERY UNITS AND GAS GAS COMPRESSOR A -C-0510 REPLACEMENT PROJECT.' COMPRESSORS NECESSARY TO PERFORM MANNTENANCE AND REPLACE 1MTN NEW GAS COMPRESSOR. DEMOLITION OF 01.0 VAPOR RECOVERY UNIT COMPRESSOR. wI„ 10 01 1010'200723.59 1143 Y KNOCK AND FREE WATER OCK OUT D TANK VAPOR RECOVERY UNITS LEF 7 SMUT DOWN AFTER MECIV WICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT. RESULTING IN EXCESS FLARING.' OPERATIONAL UNSCHEDULED MAINTENANCE SHUT DOWN OF VAPOR RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAJNTENANCE AND REPLACE WITH NEW GAS COMPRESSOR. OEMOLITION OF OLD VAPOR RECOVERY UNIT COMPRESSOR GAS COMPRESSOR A -C-0610 REPLACEMENT PROJECT.' 101112007 091 10111/2007 23.50 1143 Y FREE WATER KNOCK OUT AND TANK VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT. RESULTING IN EXCESS FLARING.1 OPERATIONAL UNSCHEDULED MAINTENANCE SHUT GOWN OF VAPOR RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MANTENANCE AND REPLACE WITH NEW GAS COMPRESSOR. OEMOUTION OF OLD VAPOR RECOVERY UNIT COMPRESSOR. w ~ � GAS COMPRESSOR REPLACEMENT PROJECT.' A-C-0310 1012/20070.01 1012/2007 23:50 1143 Y FREE WATER KNOCK OUT AND TANK VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING.' OPERATIONAL UNSOEDULW MAINTENANCE SHUT DOWN OF VAPOR RECOVERY UNITS AND OARS COMPRESSORS NECESSARY TO PERFORM MANTENANCE AND REPLACE WITH NEW GAS COMPRESSOR. DEMOLITION OF OLD VAPOR RECOVERY UNIT COMPRESSOR GAS COMPRESSOR REPLACEMENT PROJECT.' A-C-0510 Facility Name: Report Date: 11/15/2007 ANNA PLATFORM (29 l AUF Excess Flare Log Report Month/Year. 01-Oct-2007 Page: 2 of Data & Tkns Event Gas MCF Planned? Descrlpdon of Incident Category Reason Actions Taken SHUT DOWN OF VAPOR RECOVERY UNITS AND GAB COMPRESSORS NECESSARY TO PERFORM MAINTENANCE AND REPLACE WITH NEW OAS COMPRESSOR DE OF OLD VAPOR RECOVERY UNIT COMPRESSOR. '� Steps Taken to Minimise Recurtenoe CAR COMPRESSOR Equipment Down MP -2 ID Number AC-0610 Begin End 151151007001 151131100723: 1141 Y FREE WATER KNOCK OUT AND TANK VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PUNNED COMPRESSOR REPLACEMENT. RESULTING IN EXCESS FuNING.I OPERATIONAL UNSCHEDULED MAINTENANCE REPLACEMENT PROJECT.' 15114/2001 1 7 23 59 1143 Y FREE WATER KNOCK OUT AND TANK VAPOR RECOVERY LINTS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING.' OPERATIONAL UNSCHEDULED MAINTENANCE SHUT DOWN OF VAPOR RECOVERY UNITS AND OAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE AND REPLACE WITH NEW OAS COMPRESSOR. REMOVAL RECOVERY UNIT GAS COMPRESSOR AC REPLACEMENT PROJECT.' 151192007 0.01 10X51007 23' N FREE WATER KNOCK OUT MC TAN( VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FALURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING W EXCESS FLARING{ OPERATIONAL UNSCHEDULED MAINTENANCE SHUT DOWN OF VAPOR RECOVERY UNITS AND GAS COMPRESSORS TO PERFORM AND REPLACE WITH NEW GA3 COMPRESSOR. REMOVAL RECOVERY UNIT GAS COMPRESSOR REPLACEMENT PROJECT.' AC-0510 10/1512007 0 01 10/16(2007 33:59 449 N FREE WATER KNOCK OUT AND TANK VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR OPERATIONAL UNSCHEDULED MAINTENANCE SHUT DO..., OF ..`.A.. RECOVERY UNITS AND OAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE AND REPLACE PATH NEW GAS CCMPRESSOR. BEGAN REMOVAL OF OLD VAPOR RECOVERY UNIT COMPRESSOR. EOUIPMENT TO SE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.I �� s AC-0510 REPLACEMENT, RESULTING IN EXCESS FLARING.' 10 15117/200723.59 447 N FREE WATER KNOCK OUT AND TANK VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING., OPERATIONAL UNSCHEDULED MAINTENANCE SMUT DOWN OF VAPOR RECOVERY WETS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE AND REPLACE With NEW GAS COMPRESSOR. REMOVAL OF OLD VAPOR RECOVERY UNIT COMPRESSOR. EOUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE' GAB COMPRESSOR REPLACEMENT PROJECT' A - C - 0610 Facility Name: Report Date: 11 /15/2007 ANNA PLATFORM 3z ge4 Excess Flare Log Report Month/Year. Oil-Ott-200T Pape: 3 of 7 Date 8 Time Event Gas MCF Planned? Description of Incident Category Reason Actions Taken Stps Taken to Minimize Recurrence Equipment Down MP -2 ID Number Begin End 10+142001 10/112007 495 N FREE WATER KNOCK OUT AND TANK VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHAP CAL FAILURE FOR OPERATIONAL UNSCHEDULED MAINTENANCE SHUT DOWN OF VAPOR RECOVERY UNITS ANO GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE AND REPLACE WITN NEW OAS COMPRESSOR. BEGAN REMOVAL OF OLD VAPOR RECOVERY UNIT COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.' GAS COMPRESSOR REPLACEMENT PROJECT.' A-C-0610 PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING.' 10119/2007 0 01 10/1912007 23 59 504 N FREE WATER KNOCK OUT ANC TANK VAPOR RECOVERY UNIT$ LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING.' OPERATIONAL UNSCHEDULED MAINTENANCE SHUT DOWN OF VAPOR RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE AND REPLACE WITH NEW OAS COMPRESSOR. REMOVAL OF OLO VAPOR RECOVERY UNIT GAB COMPRESSOR REPLACEMENT PROJECT.' A-C-0440 COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS 800N AS POSSIBLE./ 10120.'2007 1020/20072359 306 N FREE WATER KNOCK OUT Alt TAMA VAPOR RECOVERY UNITS LEFT SMUT DOWN AFTER MECHANICAL FALURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN OPERATIONAL UNSCHEDULED MAINTENANCE SHUT DOWN OF VAPOR RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE AND REPLACE WITH NEW GAB COMPRESSOR. REMOVAL OF OLD VAPOR RECOVERY UMT COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE] GAS COMPRESSOR REPLACBENT PROJECT] AC-D510 EXCESS FLARING.! 1021/2007 001 10721/2007 2159 494 14 FREE WATER KNOCK OUT AND TAN( VAPOR RECOVERY UNITS LEFT SMUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING.' OPERATIONAL UNSCHEDULED MAINTENANCE SHUT DOWN OF VAPOR OAS COMPRESSOR REPLACEMENT PROJECT] A -C-0510 RECOVERY UNITS AND GA$ COMPRESSORS NECESSARY TO PERFORM MAINTENANCE MO REPUCE WITH KEW GAS COMPRESSOR. REMOVAL OF OLD VAPOR RECOVERY UNIT COMPRESSOR. EQUIPMENT TO tE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.! Facility Name: Report Date: 117152007 ANNA PLATFORM 14 89 µcr Excess Flare Log Report Month Year. 01-Oct-2007 Page: 4 of 7 Date & Time Event Gas MCF Planned? Description of Incident Category . Reason Actions Taken Steps Taken to Minknize Rotuma. Equipment Down MP -2 ID Number Begin End 1022/2007000 10!22120072359 4S1 N FREE WATER KNOCK OUT AND TANK VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR OPERATIONAL UNSCHEDULED MAINTENANCE SHUT DOWN OF VAPOR GAS COMPRESSOR A-C-0610 RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE AND REPLACE WITH NEW GAS COMPRESSOR. REMOVAL OF OLD VAPOR RECOVERY UNIT AND G48 COMPRESSOR. EOLAPMENT TO SE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE./ REPLACEMENT PROJECT,/ REPLACEMENT, RESULTING IN EXCESS FUPINti 10230037 081 10'23)200723 451 N FREE WATER KNOCK OUT AND TANK VAPOR RECOVERY UMTS LEFT SHUT DOWN AFTER MECHANICAL FALURE FOR PLANNED COMPRESSOR OPERATIONAL UNSCHEDULED MAINTENANCE SHUT DOWN OF VAPOR RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE ANO REPLACE WITH NEW GAS COMPRESSOR. REMOVAL OF OLD VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE/ GAS COMPRESSOR REPLACEMENT PROJECT./ AC-0510 REPLACEMENT, RESLLTNG IN EXCESS FLARING 1 1024720070 723.59 525 N FREE WATER KNOCK OUT Alt TAM( VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT. RESULTING IN EXCESS FLARING./ OPERATIONAL UNSCHEDULED MAINTENANCE SMUT DONN OE VAPOR RECOVERY COMPRESSORS TO PERFORM BEGAN INSTALLATION VAPOR RECOVERY UNIT ANO GAS COM EQUIPMENT TO NORMAL _. E- _..._.SAS SOON AS PO581BLE.t GAS COMPRESSOR REPLACEMENT PROJECT./ A4-0510 10252007001 10/25/200723:59 a N FREE WATER KNOCK OUT AND TANK VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING W EXCESS FLARING! OPERATIONAL UNSC/EOULEO MANTENANCE SHUT DOWN OF VAPOR RECOVERY UNITS AND OAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. BEGAN INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS 500N AS POSSIBLE./ 11 A.C-0610 Facility Name: Report Date: 11/15/2007 ANNA PLATFORM 1541 PLC' Excess Flare Log Report Month/Year. 01- Oct -2007 Pape: 5 of 7 Date & Time Event Gas MCF Planned? Description of Incident Category OPERATIONAL UNSCHEDULED MAINTENANCE Acgone Taken BRUT DOWN OF VAPOR RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM WMTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EOIIIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS P088481.84 Step Taken to Minimize Recurmenee GAB COMPRESSOR Equipment Down MP•2 ID Number 400610 Begin End 10!!120010. 1012&1200723.59 432 H FREE WATER KNOCK OUT AND TANK VAPOR RECOVERY UNITS LEFT SMUT DOWN AFTER MECHANICAL FALURE FOR PLANNED COMPESSOR REPLACEMENT PROJECT.' REPLACEMENT, RESULTING IN EXCESS FLARING.$ W27120070 *027(20072358 442 N FREE WATER KNOCK OUT AND TANK VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT. RESULTING IN EXCESS FLARING -I OPERATIONAL UNSCHEDULED MAINTENANCE SMUT DOWN OF VAPOR RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MW NTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE' GAS COMPRESSOR AJCA610 REPLACEMENT PROJECT.' 1029/2007 091 MEN2007 23.59 439 N FREE WATER KNOCK OUT AND TANK VAPOR RECOVERY UNITS LEFT SMUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT. RESULTING IN EXCESS FLARING.' OPERATIONAL UNSCHEDULED MANTENANCE SHUT DOWN OF VAPOR RECOVERY UNITS AND GAB COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTAUATKR OF NEW VAPOR RECOVERY UNIT ANO GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON As POS8ISLE4 GAS COMPRESSOR AC-0610 REPLACEMENT PROJECT.' 10@82007001 10/29/200723:59 437 N FREE WATER KNOCK OUT ANO TAN( VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING) OPERATIONAL UNSCHEDULED MAINTENANCE SHUT DOWN OF VAPOR RECOVERY UNITS AID GAS COMPRESSORS NECESSARY TO PERFORM MANTENANCE. PERFORMING INSTALLATION Of NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.' OAS COMPRESSOR REPLACEMENT PROJECT.' A.0.0610 Facility Name: Report Date: 11/15/2007 ANNA PLATFORM 1 75a ALF Excess Flare Log Report Month/Year. 01- Oct -2007 Page: 6 of 7 Data & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimise Recumence MP-2 10 Number 1000/20127 0:01 10 4St N FREE WATER KNOCK OUT MO OPERATIONAL UNSCHEDULED MAJNTENANCE SHUT DOWN OF VAPOR GM COMPRESSOR AC-0610 TAM{ VAPOR RECOVERY UNITS RECOVERY UNITS MID OAS REPLACEMENT PROJECT.' LEFT SHUT DOWN AFTER COMPRESSORS NECESSARY MECHANICAL FAILURE FOR TO PERFORM MAINTENANCE. PLANNED COMPRESSOR PERFORMING INSTALLATION REPLACEMENT. RESULTING IN OF NEW VAPOR RECOVERY EXCESS FLARING' UNIT AND GM COMPRESSOR. EQUIPMENT 10 SE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.' 100112007 001 10212007 23 59 443 N FREE WATER KNOCK 01.17 AND OPERATIONAL UNSCHEDULED MAINTENANCE SHUT DOWN OF VAPOR OAS COMPRESSOR A - C - 0610 TANI( VAPOR RECOVERY UNITS RECOVERY UNITS AND GM REPLACEMENT PROJECT.' LEFT SHUT GOWN AFTER COMPRESSORS NECESSARY MECHANICAL FAILURE FOR TO PERFORM MAINTENANCE. PLANNED COMPRESSOR PERFORMING INSTALLATION REPLACEMENT. RESULTING IN OF MW VAPOR RECOVERY EXCESS FLARING' UNIT AND OAS COMPRESSOR. EQUIPMENT TO SE RERIRNEO TO NORMAL OPERATIONS AS SOON M POSSIBLE' 18681 Facility Name: Report Date: 11/15/2007 ANNA PLATFORM S 71LCF Excess Flare Log Report Month/Year ail � S/07 01-Oct-2007 Page: 7 of 7 1. Facility Number 1330000005 2. Facility Name ANNA PLATFORM 3. Field GRANITE POINT 4. Operator UNOCAL ALASKA 5. MoneJVwr of Deposition November - 07 Disposition Volume MCF " 20. For production from multiple pools, 1st cmnbibu6an dead, pool as 5 percent of Total Volume. 8. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 18742 280150 100.00% 8 Flared or vented 1 hour or less 0 0 Flared or vented more than 1 hour (see instil 20,559 10. Pilot end Purge 210 11. Used for tease operations (speedy in Remarks) 1,529 12. Other (see instructions) 0 Authorization >1 hr. Safely ?0 55 `f MCF 13. TOTAL VOLUME (ITEMS 6.12) 22,298 Lease Use MCF 14. NGL Gas Equivalent 0 Conseetve(bn MCF 15. Purchased gas 28,953 waste: MCF 16. Transferred from: 0 / - 9 - 0 8 17. Transferred to: (Express as a negative e) 0 Canartissldner Date 16. Remarks: Transferred From: Bruce Platform Transferred To: GPTF -LE% CPTF -AB Bruce Platform 0 0 0 0 I hereby certify Mal the foregoing Signature Y4 is true and correct to the best of my knowledge. '� role Production Accountant Note: All volumes must be corrected to pressure of 14.55 psis and to a temperature of 60o F. Authority 20 AAC25.235. . Panted Name Mary Indlhar Phone 7134324238 Date December 13, 2007 Form 10-422 Rev. 2/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION INSTRUCTIONS ON REVERSE SIDE Submit In Duplicate Chevron tAt 1 Plauuct Ue•.u.ption of Inculcnl Ca[ee;c ry He a o n. r.ti, x,11 H oc_..... : AL bnns f 1 [-quip..<., [),.v:.. MP- 11/012007 12:01 AM 11/01/2007 11:69 PM 448 11/02/2007 12:01 AM 11/02/2007 11:69 PM 443 ANNA PLATFORM N FREE WATER KNOCK OPERATIC OUT AND TANK VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING.' N FREE WATER KNOCK OPERATIONAL SCHEDULED OUT AND TANK MAINTENANCE VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING.' Page 1 Excess Flare Report Month: November Year. 2007 L SCHEDULED GAS MAINTENANCE COMPRESSOR REPLACEMENT PROJECT.' GAS COMPRESSOR REPLACEMENT PROJECT.) SHUT DOWN OF VAPOR A -C•051 RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.' SHUT DOWN OF VAPOR A-C-061 RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND OAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.' 11103/2007 12:01 AM 11/032007 1139 PM 440 11/04/2007 12:01 AM 11/04/2007 11:59 PM 408 ANNA PLATFORM Continued N FREE WATER KNOCK OPERATIONAL SCHEDULED OUT AND TANK VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING.' Page 2of19 Excess Flare Report Month: November Year 2007 Dar. 8. lent Begin t MCF plan neo Cc-e.t.a Or Incident Category st. 1r - rskee to rrletatior Pt ocbUrrW0.tl A ellu Prentenen Down MP- N FREE WATER KNOCK OPERATIONAL SCHEDULED OUT AND TANK MAINTENANCE VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHAN ICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT. RESULTING IN EXCESS FLARING.' MAINTENANCE GAS COMPRESSOR REPLACEMENT PROJECT.' GAS COMPRESSOR REPLACEMENT PROJECT.' SHUT DOWN OF VAPOR RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.' SHUT DOWN OF VAPOR RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE. A-C-061 AC.-051 Chevron 11/05/2007 12:01 AM 11/052007 11:59 PM 443 11/08/2007 12:01 AM 11/08/2007 11:59 PM 477 ANNA PLATFORM Continued BegiU L nJ FaCI PlanneU UCM.rl ption ul lucid °lit Category F u., oU r: It,oc Lure 1, I ovni,MP- N FREE WATER KNOCK OUT AND TANK VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT. RESULTING IN EXCESS FLARING.' Page 3 of 19 OPERATIONAL Excess Flare Report Month: November Year. 2007 Y FREE WATER KNOCK OPERATIONAL SCHEDULED OUT AND TANK MAINTENANCE VAPORRECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT. RESULTING IN EXCESS FLARING.' SCHEDULED GAS MAINTENANCE COMPRESSOR REPLACEMENT PROJECT.' GAS COMPRESSOR REPLACEMENT PROJECT.' SHUT DOWN OF VAPOR A-C-051 RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.' SHUT DOWN OF VAPOR A-C-061 RECOVERY UNITS AND GM COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAB COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.' Chevron ANNA PLATFORM Continued tr, Mtimmit R(.:; Ceti rrel'Cc F 1 tlI )I 1011 DOW n MP DAL, rw. BPgin f]ul (1C1 Pl: +niu.t De zc ri ptioi 1 of Incident Catcilo*v PERATIONAL SCHEDULED 11/07/2007 12:01 AM 11/07/2007 11:59 PM 505 11/08/2007 12:01 AM 11/08/2007 11:69 PM 484 Y FREE WATER KNOCK OUT AND TANK VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT. RESULTING IN EXCESS FLARING] Y FREE WATER KNOCK OPERATIONAL SCHEDULED OUT AND TANK MAINTENANCE VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT. RESULTING IN EXCESS FLARING.I Page 4 of 19 Excess Flare Report Month: November Year: 2007 GAS MAINTENANCE COMPRESSOR REPLACEMENT PROJECT] gas COMPRESSOR REPLACEMENT PROJECT] SHUT DOWN OF VAPOR RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE] SHUT DOWN OF VAPOR RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE] A-C-051 A-C-061 Chevron N INO ANNA PLATFORM Continued f1.ar g lum• He 9:n Ff,d i .sue 1` of Imwdenl Cstap,l'y I:ceso, Uuv. 11 7P- 11/092007 12:01 AM 11/09/2007 11:59 PM 444 11/102007 12:01 AM 11/102007 11:59 PM 444 Y FREE WATER KNOCK OPERATIONAL SCHEDULED OUT AND TANK MAINTENANCE VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING./ Y FREE WATER KNOCK OPERATIONAL SCHEDULED OUT AND TANK MAINTENANCE VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING,/ Page 5 of 19 Excess Flare Report Month: November Year. 2007 GAS COMPRESSOR REPLACEMENT PROJECT./ GAS COMPRESSOR REPLACEMENT PROJECT./ A•C -051 SHUT DOWN OF VAPOR RECOVERY UNITS AND OAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE./ SHUT DOWN OF VAPOR AC -061 RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND OAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE./ ch� 11!11!2007 AM 11111/2007 11:59 PM 440 11/14/2007 12:01 AM 11/14/2007 11:59 PM 442 ANNA PLATFORM Continued Excess Flare Report Month: November Year: 2007 !Teton 1).14: Y. Tun I ltd 611.i I'I,uuictl [n. sC IIpifun.u( Inodcnl Ualcqul RC3f, M 11: A eUon Cqu:pmal Unwu f.9P Y FREE WATER KNOCK OPERATIONAL SCHEDULED OUT AND TANK MAINTENANCE VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING. N FREE WATER KNOCK OPERATIONAL UNSCHEDULED OUT AND TANK MAINTENANCE VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING.' Page 8 of 19 GAS COMPRESSOR REPLACEMENT PROJECT.' GAS COMPRESSOR REPLACEMENT PROJECT.' SHUT DOWN OF VAPOR A-C-051 RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.' SHUT DOWN OF VAPOR A-C.061 RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO SE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE./ Chevron I WO IWO ANNA PLATFORM Continued L,id 1.1 I' t) nldual:.1 Incident Gdtt:rior HCASGtI )III111 1 E.titn NIA; quiprert Lu.:l MP 11/16/2007 12:01 AM 11/1612007 11:59 PM 447 11/16200712:01 AM 11/182007 11:59 PM 448 N FREE WATER KNOCK OPERA ONAL UNSCHEDULED OUT AND TANK VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING.] FREE WATER KNOCK OPERATIONAL UNSCHEDULED OUT AND TANK MAINTENANCE VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING.] Page 7 of 19 Excess Flare Report Month: November Year. 2007 GAS MAINTENANCE COMPRESSOR REPLACEMENT PROJECT.] OAS COMPRESSOR REPLACEMENT PROJECT.] SHUT DOWN OF VAPOR A-C-051 RECOVERY UNITS AND OAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.' SHUT DOWN OF VAPOR A-C-051 RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EOUIPMENT TO BE RETURNED TO NORMAL. OPERATIONS AS SOON AS POSSIBLE.' P.rgi 11/17/2007 12:01 AM 11/17/2007 11:58 PM 448 11/19/2007 12:01 AM 11/192007 11:69 PM 1150 ANNA PLATFORM Continued Y FREE WATER KNOCK OPERATIONAL OUT AND TANK VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING.( Page 8 of 19 Excess Flare Report Month: November Year. 2007 U..lv Z Into t ❑tl H••SOn bb i; IY�n l• . M lu. u. 1 r. tk Fr1UiPnu 11 DOV/11 MP- PAI.F Piznnotl DC•Schl1ton of IIIL IIICIIt Cdtvyniy N FREE WATER KNOCK OPERATIONAL UNSCHEDULED OUT AND TANK MAINTENANCE VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING.( UNSCHEDULED MAINTENANCE GAS COMPRESSOR REPLACEMENT PROJECT.( OAS COMPRESSOR REPLACEMENT PROJECT" SHUT DOWN OF VAPOR A-C-051 RECOVERY UNITS AND OAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE" SHUT DOWN OF VAPOR A -C-061 RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMEN TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.( Chevron I WO Begin 1120/2007 12:01 AM 11/20/2007 11:59 PM 1150 1121200712:01 AM 11/21/2007 11:59 PM 1150 ANNA PLATFORM Continued Excess Flare Report Month: November Teen 2007 lint End MCF Plannod Dos c ri pt,on of Incident Cater ory Reason stays I.,kcn ILL Minunvt Raoc cnnOncv 1i IJn Equipn:n Uown MP- Y FREE WATER KNOCK OPERATIONAL UNSCHEDULED OUT AND TANK MAINTENANCE VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING.' Y FREE WATER KNOCK OPERATIONAL UNSCHEDULED OUT AND TANK MAINTENANCE VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING.' Page 9ot19 GAS COMPRESSOR REPLACEMENT PROJECT./ GAS COMPRESSOR REPLACEMENT PROJECT.' SHUT DOWN OF VAPOR AC -061 RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.I SHUT DOWN OF VAPOR AC-061 RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.' Chevron 11/22/2007 12:00 AM 11/22/2007 11:59 PM 1160 11/23/2007 12:01 AM 11/23/2907 11:59 PM 1150 ANNA PLATFORM Continued Y FREE WATER KNOCK OPERATIONAL OUT AND TANK VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING.' Page 10 of 19 Excess Flare Report Month: November Year: 2007 u ion: Begin rod F C!a,.ucd Description ul Incident (-meow; Koasun 5t. Ft, I. n t r.:int .1oen , 1.in, Inipr ,: Clown P.1P- Y FREE WATER KNOCK OPERATIONAL UNSCHEDULED OUT AND TANK MAINTENANCE VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT. RESULTING IN EXCESS FLARING.( UNSCHEDULED MAINTENANCE GAS COMPRESSOR REPLACEMENT PROJECT.) GAS COMPRESSOR REPLACEMENT PROJECT. SHUT DOWN OF VAPOR AC-061 RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND OAS COMPRESSOR. • EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE. SHUT DOWN OF VAPOR A-C-061 RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.{ chevron Dat: &Inn End kca ,on stet- . T 1Y'\: t kr ., wren, r, 1ukt It Lryitymen Down MP Degln 11!2412007 12:01 AM 11 .4/2007 11:59 PM 1150 11/26/2007 12:01 AM 11/25/2007 11:59 PM 1150 ANNA PLATFORM Continued IACT Planned LIP- CILIA/011 or Incident Catcyory Y FREE WATER KNOCK OPERATIC OUT AND TANK VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING.I Y FREE WATER KNOCK OPERATIONAL UNSCHEDULED OUT AND TANK MAINTENANCE VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING.I Page 11 of 19 Excess Flare Report Month: November Yeas 2007 L UNSCHEDULED MAINTENANCE GAS COMPRESSOR REPLACEMENT PROJECT.' GAS COMPRESSOR REPLACEMENT PROJECT,( SHUT DOWN OF VAPOR A-C-061 RECOVERY UNITS AND OAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE. SHUT DOWN OF VAPOR A -C-061 RECOVERY UNITS AND GAS COMPRESSORS NECESSARY To PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.' ch.vron IWO IWO E■ent MC I- Planned Oeuriptron of Incident Category Nc an sn 'Up", %Lindh,. I2eoC6orrence Action Date 8.11911 Berpn Friel 11126/2007 12:01 AM 11/26/2007 11:59 PM 1150 11/27/2007 12:01 AM 11/27/2007 11:69 PM 1150 ANNA PLATFORM Continued Y FREE WATER KNOCK OPERATIONAL NORMAL OUT AND TANK OPERATIONS VAPOR RECOVERY • UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING. Y FREE WATER KNOCK OPERATIONAL OUT AND TANK VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING./ Page 12 of 19 Excess Flare Report Month: November Year: 2007 SCHEDULED MAINTENANCE GAS COMPRESSOR REPLACEMENT PROJECT.$ GAS COMPRESSOR REPLACEMENT PROJECT. SHUT DOWN OF VAPOR RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE./ SHUT DOWN OF VAPOR RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE./ Lquipnwn Doom MP- A-C-061 Chevron I SO MOO Regis nate 8 loan End MCP' Planned n, nptinn of Incident Cateyoty Rc o s on Steps T_,k1. t PA 11:11111/ Rnrcr urreie.e Aclicn1 1 aken F.quipmrn Duvet MP- 1128200712:01 AM 11282007 11:59 PM 1150 112912007 AM 1129200711:59 PM 1150 ANNA PLATFORM Continued Y FREE WATER KNOCK OPERATIONAL SCHEDULED OUT AND TANK MAINTENANCE VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING.I Y FREE WATER KNOCK OPERATIONAL SCHEDULED OUT AND TANK MAINTENANCE VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING.I Page 13 of 19 Excess Flare Report Month: November Year: 2007 GAS COMPRESSOR REPLACEMENT PROJECT.' GAS COMPRESSOR REPLACEMENT PROJECT.' SHUT DOWN OF VAPOR A-PM-0S RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL. OPERATIONS AS SOON AS POSSIBLE.' SHUT DOWN OF VAPOR A-PM-0S RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.I Chevron I WO 11/30/2007 12:01 AM 11/30/2007 11:59 PM 1150 ANNA PLATFORM Continued Y FREE WATER KNOCK OPERATIONAL OUT AND TANK VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT. RESULTING IN EXCESS FLARING. Page 14 of 19 Excess Flare Report Month: November Year: 2007 D.de 8 Tuui, Begin End .vnt Get MCI' Planned Description of incident Catcyory Reason Strp: iaIe■ to hfi n n c Rcoccurrr : AC tur l aken Equipmmn Down MP- . SCHEDULED MAINTENANCE OAS COMPRESSOR REPLACEMENT PROJECT.I r ?1/2 /J, 1 �1 tr3 SHUT DOWN OF VAPOR A -PM-05 RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE., STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION GAS DISPOSITION Form 10-422 Rev. 2/2004 INSTRUCTIONS ON REVERSE SIDE Submit In Dupicab 1. Facility Number 1330000005 2. Facility Name ANNA PLATFORM 3. Field GRANITE POINT 4. Operator UNOCAL ALASKA 5. Mono'w of Disposition December -07 Disposition Volume MCF 20. For production from multiple pools, Gat contribution of each pod as • Anent II Total Volume. 8. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 18742 280150 100.00% 6. Flared or vented 1 hour Or less 0 9. Flared or vented more than 1 hour (see instr.) 35,850 10. Pilot and Purge 21 7 11. Used for base operations (specify In Remarks) 5,458 Safety .3 S, b AZ MCP 12. Other (see instructions) G Authorization >1 hr' 13. TOTAL VOLUME (VIEWS 6 -12) 41 325 Lease Use MCF 14. NGL Go Equivalent 0 Conservation MCF 15 Purchased pas 20,346 Waste: MCF 18. Transrred from: 17. Transferred to: (Express as a negative 1) 0 (20) ��(f, /./ _______ /t// // Commissioner Date 18. Remarks: p Transferred From: Bruce Platform o .�+ H,., — /� efida- est Transferred To GPTF - LEX 0 GPTF - (20) `nr-454. Bruce Platform 0 I hereby certify that ale foregoing is true and correct to the best of my knowledge. Signature Tina Production Accountant Note: All volumes must be consoled Note: pressure of 14.85 psis and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Mary Indlhar Phone 713-4324238 Date January 16, 2008 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION GAS DISPOSITION Form 10-422 Rev. 2/2004 INSTRUCTIONS ON REVERSE SIDE Submit In Dupicab O:a• l:n Ina 12/01 . 1111 7 12:11 AM 12/01 • l 11: 11 12/02/2007 12:01 AM 12/02/2007 11:58 PM 1150 Y FREE WATER KNOCK OUT AND TANK VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING-I ANNA PLATFORM Page 1 Excess Flare Report Month: December Year. 2007 u, L . 1 It pS I 4•11 ID *i.1.1f'. f :I 1::. ,r�y:6. a: n( lui idrya C Y. r,..ry I'..i'nn •P =7. FO` • L SCHEDULED GAS MAINTENANCE Y FREE WATER KNOCK OPERATIONAL SCHEDULED OUT AND TANK MAINTENANCE VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL. FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING. COMPRESSOR REPLACEMENT PROJECT.' GAS COMPRESSOR REPLACEMENT PROJECT.' SHUT DOWN OF VAPOR A -PM.OS RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.) SHUT DOWN OF VAPOR A -PM•O& RECOVERY UNITS AND OAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS 80014 AS POSSIBLE.) 1.101 , r ;co I I..ua u_J I nplwn of hlu Ji ni t_.i •.yorJ Hewn 101 cif t r.(It to (Ili ns 1.0u0 LiuWu MP- 121032007 12:01 AM 00711: ' PM 1160 12/04/200712:01 AM 12104/200711:09 PM 1150 ANNA PLATFORM Continued Y FREE WATER KNOCK OPERA OUT AND TANK VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT. RESULTING tN EXCESS FLARING.' Excess Flare Report Month: December Year. 2007 0 L UNSCHEDULED MAINTENANCE Y FREE WATER KNOCK OPERATIONAL UNSCHEDULED OUT AND TANK MAINTENANCE VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT. RESULTING IN EXCESS FLARING.' Page 2 of 19 GAS COMPRESSOR REPLACEMENT PROJECT.' GAS COMPRESSOR REPLACEMENT PROJECT.' SHUT DOWN OF VAPOR A - C - 051 RECOVERY UNITS AND OAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.' SHUT DOWN OF VAPOR A -C-O51 RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE' Chevron IWO ANNA PLATFORM Continued II,1i F III(. mr I 1)., . ■ It _,. „t to tt ; 1.1 I1 o, I.1 J 111 Pf ocr. trrc tit o _yuq 1 1205/2007 12:01 AM 12/05/2007 1 : •% PM 1150 12/Q 200712A1 AM 12/00/2007 1 1:59 PM 1150 Y FREE WATER KNOCK OPERATI OUT AND TANK VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT. RESULTING IN EXCESS FLARING./ Y FREE WATER KNOCK OPERATIONAL UNSCHEDULED OUT AND TANK MAINTENANCE VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING./ Page 3 of 19 Excess Flare Report Month: December Year. 2007 UNSCHEDULED GAS COMPRESSOR REPLACEMENT PROJECT./ MAINTENANCE GAS COMPRESSOR REPLACEMENT PROJECT./ SHUT DOWN OF VAPOR A-C -061 RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE./ SHUT DOWN OF VAPOR A•C-061 RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE./ ANNA PLATFORM Continued I 61r' P i414nLll. 4 U•' I r,n O l Inc .4. nt ,HOq�a, o on TaIrn 1 roccu '01 A. , 11111 1 111._•11 11,,,,,1 n1r I. ref 12/07/200712:00 AM 1 r 7!200711:59 12/01V2007 12:01 AM 12/06/2007 11:59 PM 1150 n ,11 1150 Y FREE WATER KNOCK OPERATIO OUT AND TANK VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING./ Y FREE WATER KNOCK OPERATIONAL UNSCHEDULED OUT AND TANK MAINTENANCE VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING./ Page 4 of 19 Excess Ram Report Month: December Year: 2007 UNSCHEDULED GAS MAINTENANCE COMPRESSOR REPLACEMENT PROJECT./ OAS COMPRESSOR REPLACEMENT PROJECT./ SHUT DOWN OF VAPOR A-C-061 RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.) SHUT DOWN OF VAPOR A C-C61 RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND OAS COMPRESSOR. EQUIPMENT TO SE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE./ ' Ir;, T.,;•.. , 1 Y yu;pmCn Down r,uP- 12/00/2007 12:01 AM 12!00/2007 11: 12110200712 :01 AM 12/10/2007 11:59 PM 1150 ANNA PLATFORM Continued an a L., ,; n,., � „I t fl t . a.:,; ., 1130 V FREE WATER KNOCK OPERATI• OUT AND TANK VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING./ Y FREE WATER KNOCK OPERATIONAL UNSCHEDULED OUT AND TANK MAINTENANCE VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, . RESULTING IN EXCESS FLARING./ Page 5 of 19 Excess Flare Report Month: December Year: 2007 NAL UNSCHEDULED MAINTENANCE GAS COMPRESSOR REPLACEMENT PROJECT./ GAS COMPRESSOR REPLACEMENT PROJECT./ SHUT DOWN OF VAPOR A RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE./ SHUT DOWN OF VAPOR A-C-051 RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE/ chs 1 2111 2007 12:01 AM 12/1 12/1212007 12:01 AM 12/12/200711:69 PM 1160 ANNA PLATFORM Continued na 11: >: PM 1160 Y FREE WATER KNOCK 0 A. I OUT AND TANK VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT. RESULTING IN EXCESS FLARING.' Page 6 of 19 Excess Flare Report Month: December Year: 2007 uiucii L1 It III ui I ILLI-W l <..0 RATIO ►� I e uumrn ' Uo MAINTENANCE Y FREE WATER KNOCK OPERATIONAL UNSCHEDULED OUT AND TANK MAINTENANCE VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING.' UNSCHEDULED GAS COMPRESSOR REPLACEMENT PROJECT.' GAS COMPRESSOR REPLACEMENT PROJECT.' SHUT DOWN OF VAPOR A-C -061 RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL. OPERATIONS AS SOON AS POSSIBLE.' SHUT DOWN OF VAPOR A-C-061 RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.i r ,r .iiU(1.JI,7 f_ 101; t( RA •NAL UNSCHEDULED GAS i- ir.,rn ro: n U, es MP- T.,a „, SHUT DOWN OF VAPOR a ,y� 12/13/2001 12:01 AM 1 .1711: -' P 160 12/14/2007 12:01 AM 12/14/2007 11:69 PM 1160 ANNA PLATFORM Continued Y FREE WATER KNOCK OUT AND TANK VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING Y FREE WATER KNOCK OPERATIONAL OUT AND TANK VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT. RESULTING IN EXCESS FLARING] Page 7 of 19 Excess Ram Report Month: December Year. 2007 MAINTENANCE UNSCHEDULED MAINTENANCE COMPRESSOR REPLACEMENT PROJECT.' GAS COMPRESSOR REPLACEMENT PROJECT.' RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS P0881BL SHUT DOWN OF VAPOR RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.' 1 A-C-061 Heflin url , ::r ,r Slops r .,k, , to 11.11 ai Ra D• r:coC..unetk t. i.; tipm, I.ik.:II r _t,rrho Uor+u MP. • 12/15/200712:01 AM 12/15400711: 12/15/2007 12 01 AM 12/18/200711:59 PM 1150 ANNA PLATFORM Continued tr ILr I nl 111, I'll vtl C.rlvgt,ry •P - 7TIONAL UNSCHEDULED GAS COMPRESSOR REPLACEMENT PROJECT.( 1150 Y FREE WATER KNOCK OUT AND TANK VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT. RESULTING IN EXCESS FLARING.{ Y FREE WATER KNOCK OPERATIONAL UNSCHEDULED OUT AND TANK MAINTENANCE VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT. RESULTING IN EXCESS FLARING.' Page 8 of 19 Excess Flare Report Month: December Year•. 2007 MAINTENANCE GAS COMPRESSOR REPLACEMENT PROJECT.' A-C-051 SHUT DOWN OF VAPOR RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.' SHUT DOWN OF VAPOR A.0 -051 RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.' 12/17/2007 12:01 AM 12/17/2007 11:69 PM 1160 12/18/20071201 AM 12/18200711:69 PM 1160 ANNA PLATFORM Continued Excess Flare Report Month: December Year 2007 FL. Lnd t it a Fla IJ_;..,nphon of lnadcnt Calcgoip F.`ascn SL:Ir. T.4 iLI n fLn Iiii:c Ficoct.urrt:ncc Actioin f.4cny 1. ItJ 1 cn Uu•en MP- Y FREE WATER KNOCK OPERATIC OUT AND TANK VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING./ Page 9of19 AL UNSCHEDULED GAS MAINTENANCE COMPRESSOR REPLACEMENT PROJECT.) Y FREE WATER KNOCK OPERATIONAL UNSCHEDULED OUT AND TANK MAINTENANCE VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT. RESULTING IN EXCESS FLARING./ GAS COMPRESSOR REPLACEMENT PROJECT. SHUT DOWN OF VAPOR A -0-061 RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE./ SHUT DOWN OF VAPOR A-C-061 RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE./ 1).■• r L' I ir n : tn..; Lui T tr 4 <c asun u, r.4 to rl; itllO.i:" F• o curretin. A., +:. i ek�.n , Uovn, MP- 12/19/200712:01 AM 1 711: 12/24/200712:01 AM 1212012007 11:69 PM 1150 ANNA PLATFORM Continued r:K -F V'launod Cc'.a.l l UOn )1 %cxlcul C,rtCalt..% Y FREE WATER KNOCK OPERATIONAL 11 OUT AND TANK VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING.' V FREE WATER KNOCK OPERATIONAL UNSCHEDULED OUT AND TANK MAINTENANCE VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING. Page 10 of 19 Excess Flare Report Month: December Veer: 2007 UNSCHEDULED MAINTENANCE GAS COMPRESSOR REPLACEMENT PROJECT.' GAS COMPRESSOR REPLACEMENT PROJECT.' SHUT DOWN OF VAPOR RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTAUATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.' SHUT DOWN OF VAPOR RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.' A-C-051 A -C•061 ANNA PLATFORM Continued •t I!L'(j'. 11. ,F. - 1 Httl': r.. ,dF.,. 11 L r1U 1I rn1Ci1 I :own MP- 12/21/2007 12:01 AM Lh -1 i9.,nn(,I 1L..+ r,Idli.1[ rd Inch it n( L..µ, 11:66 '" 11. Y FREE WATER KNOCK • "ERA • r OUT AND TANK VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING./ 12/22/2007 12:01 AM 12/22/2007 11:60 PM 1150 Y FREE WATER KNOCK OPERATIONAL. UNSCHEDULED OUT AND TANK MAINTENANCE VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING./ Pa90 11 of 19 Excess Ram Report Month: December Year. 2007 UNSCHEDULED GAS COMPRESSOR REPLACEMENT PROJECT.► MAINTENANCE GAS COMPRESSOR REPLACEMENT PROJECT./ SHUT DOWN OF VAPOR A -C-O61 RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE./ SHUT DOWN OF VAPOR A-C-061 RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO SE RETURNED TO NORMAL OPERATIONS AS 800N AS POSSIBLE./ • I .c1 I l'i.u.u.d 1:. rq.tiwi .1111 11.11( , l 4'unui�� LrIUInt ('1 f)c,wr, rnp- 12/23/2007 17.01 AM 1 7 11:50 1224/2007 12:01 AM 122412007 1119 PM 1160 ANNA PLATFORM Continued 1150 Y FREE WATER KNOCK OPERATIONAL UNSCHEDULED OUT AND TANK MAINTENANCE VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING Y FREE WATER KNOCK OPERATIONAL UNSCHEDULED OUT AND TANK MAINTENANCE VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT. RESULTING IN EXCESS FLARING./ Page 12 of 18 Excess Flare Report Month: December Year. 2007 OAS COMPRESSOR REPLACEMENT PROJECT./ GAS COMPRESSOR REPLACEMENT PROJECT./ SHUT DOWN OF VAPOR A-C-061 RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.' SHUT DOWN OF VAPOR A -0.061 RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE./ U,r1 - I , T ]T. 1,41 1 i'1_urncti D „xigrron ul int,wera C, .:IC y.,�y. OPERA 10 ktr Tsui) UNSCHEDULED GAS T 40 to Miinuli.a Fyuq�n u.n HOJCLbrre nee A ,.uo n:, Lik SHUT DOWN OF VAPOR A- Down MP• 1212512007 1201 AM 1 7 11:59 PM 1 50 ANNA PLATFORM Continued Y FREE WATER KNOCK OUT AND TANK VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING.' 12282007 12:01 AM 12282007 11:59 PM 1150 Y FREE WATER KNOCK OPERATIONAL OUT AND TANK VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FLARING.' Page 13 of 19 Excess Flare Report Month: December Year. 2007 MAINTENANCE UNSCHEDULED MAINTENANCE COMPRESSOR REPLACEMENT PROJECT.) GAS COMPRESSOR REPLACEMENT PROJECT.' 1 RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.' SHUT DOWN OF VAPOR A RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO SE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.) B. o tv LBO 12/2 12007 12:01 AM 1 720'7 11: r ' 12/29/200712:01 AM 12282007 11:69 PM 1160 ANNA PLATFORM Continued 1150 Y FREE WATER KNOCK OUT AND TANK VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT. RESULTING 04 EXCESS FLARING./ Page 14 of 19 Excess Flare Report Month: December Year. 2007 ra:f' 1.1111 1 D. - sr rgrto,111 of Int idmtl Ca0..tjot Itr.uon •' ' • '11 Slim, 11111ri F — 1' Hrncr ur mr,cc i�r 111111', .1{0 11 t-tpuitinett I j.vn MP. Y FREE WATER KNOCK OPERATIONAL UNSCHEDULED OUT AND TANK MAINTENANCE VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT. RESULTING IN EXCESS FLARING.' UNSCHEDULED GAS COMPRESSOR REPLACEMENT PROJECT.% MAINTENANCE GAS COMPRESSOR REPLACEMENT PROJECT. SHUT DOWN OF VAPOR A.C.061 RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.% SHUT DOWN OF VAPOR A RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE.' 12/29/2007 2:01 AM 12/2 • ' ' 7 11: - ' P 11 12130200712:01 AM 12/30/200711:59 PM 1150 ANNA PLATFORM Continued Page 15 of 19 Excess Flare Report Month: December Year. 2007 „ • srr T.4.1 L. urtinc rvlulnu v�. .d, a Equiviiion Down rym- Y FREE WATER KNOCK OPERATIONAL UNSCHEDULED OUT AND TANK MAINTENANCE VAPOR RECOVERY 0141TS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT. RESULTING 114 EXCESS FLARING./ Y FREE WATER KNOCK OPERATIONAL UNSCHEDULED OUT AND TANK MAINTENANCE VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT. RESULTING IN EXCESS FLARING./ GAS COMPRESSOR REPLACEMENT PROJECT./ GAS COMPRESSOR REPLACEMENT PROJECT./ SHUT DOWN OF VAPOR A -0.061 RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE./ SHUT DOWN OF VAPOR A.C.-051 RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EOUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE./ ANNA PLATFORM Continued I;.r: K lit i nU t :l.i' Pl.m: - , 1_d f,. ,rn ptirn nI Inr Mild C:41( SII ps L,4 en'n 01i,nn 2 Rres6111(CI}Ce /'. ton; 1.lkh 1).J :•1,1 MP- �l 1)111 12/31/2007 1701 AM 1 1/2007 11:59 PM 1150 Y FREE WATER KNOCK OUT ANO TANK VAPOR RECOVERY UNITS LEFT SHUT DOWN AFTER MECHANICAL FAILURE FOR PLANNED COMPRESSOR REPLACEMENT, RESULTING IN EXCESS FIARING.I x'1 1 1,7/0e Page 16 of 19 Excess Flare Report Month: December Year: 2007 ONAL UNSCHEDULED GAS MAINTENANCE COMPRESSOR REPLACEMENT PROJECT.; SHUT DOWN OF VAPOR RECOVERY UNITS AND GAS COMPRESSORS NECESSARY TO PERFORM MAINTENANCE. PERFORMING INSTALLATION OF NEW VAPOR RECOVERY UNIT AND GAS COMPRESSOR. EQUIPMENT TO BE RETURNED TO NORMAL OPERATIONS AS SOON AS POSSIBLE./ A-C-061