Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutGP Anna Platform / Unocal STATE OF ALASKA AOGCC GAS DISPOSITION FILES YEAR: 2002 FACILITY: GP Anna Platform OPERATOR: UNION OIL CO OF CALIFORNIA ..... ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) MonthlY ear of Disposition ANNA PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD JANUARY 2002 Disposition Volume MCF* 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour 892 / (Supplemental report reqaired - See 20 AAC 25.235) 5. Pilot and Purge 217 6. Used for lease operations 33.497 7. Other 0 TOTAL items 1 - 7 34.606 / 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: 26,662 Remarks: I hereby certify that the t<golng Is true and correct to the best or my knowledge. Signature ØøQ, ,;j.k Title ACCOUNTING SUPERVISOR Date 02/07/2002 7r I Form 10-422 Rev. 4/95 *Indicate contribution of eac,h pool to total. Pool Name Code Percent. MIDDLE KENAI 280150 100.00 !!·~IIIII!il~lill~I!~ill~II·I~~IIi=II~I!III~1111111111111111111/111/1/1 1. Safety MCF 2. Lease Use gý;).- MCF 3. Conserv. Purposes MCF 3/ __I . ~ 0 r- Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 IL Excess Flare Log Report Facility Name: ANNA PLATFORM MonthlY ear: January 2002 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimi~e Recurrence MP-2 ID Number 1/30/200216:00 1/30/200223:69 400 N Pipeline shut-in to bleed off OPERATIONAL OTHER: SEE DESC OF EVENT 'A' line undergoing pigging Normal oil field operation. pressure for stuck pig. operation to remove liquids. Pig stuck at base of Bruce in 12-inch diameter section of pipe. Free pig by bleeding down P/L to remove pressure, return pig to Anna for removal from line. Return facility to normal operations. 1/31/20020:00 1/31/200212:00 492 N Pipeline shut-in to bleed off OPERATIONAL OTHER: SEE DESC OF EVENT 'A' line undergoing pigging Normal oil field operation. pressure for stuck pig. operation to remove liquids. Pig stuck at base of Bruce in 12-inch diameter section of pipe. Free pig by bleeding down PIL to remove pressure, return pig to Anna for removal from line. Return facility to normal operations. . Report Date: 2/11/2002 Page: 1 of 1 flare on Anna and Bruce Subject: flare on Anna and Bruce Date: Thu, 31 Jan 2002 17:22:31 -0800 From: "Bounds, Janet G" <boundsj@unocal.com> To: "McMains, Stephen·E -Vendor" <Steve_McMains@admin.state.ak.us> CC: "Dorman, Allen" <dormana@unocal.com>, "Myers, Chris S" <myersc@unocal.com> Steve On Monday, January 28, 2002 we began pigging the gas line from Anna to Bruce ~o remove ~ondensate. The pig became stuck in the line. Efforts to free the pig did not work until the line was shut in, and we waited for the temperature in the line to raise. The pig was freed around 2:00 pm today. The pigging activity resulted in increased flare volumes at both Anna and Bruce platforms. Janet G. Bounds Senior Environmental Scientist Unocal Phone (907) 263-7694 Fax (907) 263-7901 1 of 1 2/1/026:17 AM ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) MonthlY ear of Disposition ANNA PLATFORM ) UNOCAL ALASKA RESOURCES GRANITE POINT FIELD FEBRUARY 2002 Disposition Volume MCF* 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour 585/ (Snpplemental report reqnired - See 20 AAC 25.235) 5. Pilót and Purge 196 6. Used for lease operations 29.320 7. Other 0 TOTAL items 1 - 7 30.101/ 8. NGL gas equivalent produced 0 9. Purchased gas 643 10. Transferred from: 0 11. Transferred to: 26.912 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature dlej(f( 02e !1t,j¿' Title ACCOUNTING SUPERVISOR Date 03/08/2002 'I fI Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent MIDDLE KENAI 280150 100.00 ................................................................................................................. .................................................................................................................................................................................................................................. :i!!·III~II.I~¡IIII::~.I~IIIIII~III!~··I·i~I·:I·-¡!III·'1:'1:11:'.11'" 1. Safety MCF 2. Lease Use 5fS MCF ìUrÅ- 312.'1./0 L 3. Conserv. Purposes MCF 3/ ,þJ'{t>.;r Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 Excess Flare Log Report Facility Name: ANNA PLATFORM MonthlYear: February 2002 Date & Time Event Gas Steps Taken to Equipment Down Begin End ) MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 2/1/20020:00 2/1/2002 16:00 585 Y Gas compressor shutdown for OPERATIONAL SCHEDULED MAINTENANCE Insure appropriate personnel and Routine maintenance to safe scheduled maintenance. equipment are on site prior to and reliable operation. shutdown, perform inspection and maintenance on compressor, and return facility to normal operation as soon as possible. . Report Date: 3/8/2002 Page: 1 of 1 ~ ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) MonthlY ear of Disposition ANNA PLATFORM , UNOCAL ALASKA RESOURCES GRANITE POINT FIELD MARCH 2002 Disposition Volume MCF* 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 35 ./ 4. Flared or vented greater than 1 hour 530 ,/ (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 217 6. Used for lease operations .. 32,063 7. Other 0 TOTAL items 1-7 32.845 8. NGL gas equivalent produced 0 9. Purchased gas 376 10. Transferred from: 0 ., 11. Transferred to: 27.351 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature /lit /r?:a~ ÌY;/j(jIÞ~ Title ACCOUNTING SUPERVISOR Date 04/12/2002 J 1/ Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent MIDDLE KENAI 280150 100.00 , 11 11111111~¡111111~111.1111111~11111~1111!llllllllil 1IIIIIilll 1. Safety MCF 2. Lease Use 63D MCF VJ6,f- 3. Conserv. Purposes MCF 4/>1(OY Note: All volumes must be cor ec e to pressure of 14.65 psia and to a temPRwwr$( o~¡ Z DOL 60 degrees F. Report due by the 20tlt\rtitbJ month following the month of disposition. ¡-.'" " n Authority 20 AAC 25.235 A1aSka(J&Gas\lUlIi. ~ Excess Flare Log Report Facility Name: ANNA PLATFORM MonthlYear: March 2002 Date & Time Event Gas Steps Taken to Equipment Down Begin End . MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 3/12/200219:15 3/12/2002 23:59 197 N GAS COMPRESSOR DOWN FOR OPERATIONAL UNSCHEDULED MAINTENANCE Compressor shut down due to bad Replace controller card. MAINTENANCE controller card. Instrument technician flown to platform. compressor repaired and facility returned to normal operation as soon as possible. AOGcc was given prior e-mail notice on flaring on M"rr.h 14 2002. 3/13/20020:00 3/13/20028:00 333 N GAS COMPRESSOR DOWN FOR OPERATIONAL UNSCHEDULED MAINTENANCE Compressor shut down due to bad Replace controller card. MAINT. controller card. Instrument technician flown to platform, compressor repaired and facility returned to normal operation as soon as possible. AOOcc was given prior e-,"-ail nptice on flaring on March 14, 2002. .. " '. Report Date: 4/11/2002 Page: 1 of 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) MonthlY ear of Disposition ANNA PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD APRIL 2002 Disposition Volume MCF* 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 25 ¡./ 4. Flared or vented greater than 1 hour 1. 092 ./ (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 210 ,,/ 6. Used for lease operations 32.183 ;/ 7. Other 0 TOTAL items 1 - 7 33.510 ./ 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: 25.165 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signatured&.ld ;l~~ Title ACCOUNTING SUPERVISOR Date 05/07/2002 // // v. Form 1 0-422 Rev. 4195 *Indicate contribution of each pool to total. Pool Name Code Percent MIDDLE KENAI 280150 100.00 !:I:lli111·I;il¡II~IÎ~·I!.IIIIIIII·II!I~~ilillllll·:I·~.¡.j~1·lll 1. Safety {öc¡-z.- MCF 2. Lease Use MCF 3. Conserv. Purposes MCF ~A.~r1. , ~ ~ Commi loner Date .5ß¡e- Note: All volumes must be corrected~t? r.' /' ('" pressure of 14.65 psia and to a temp"'a~ ot 60 degrees F. Report due by the 20th of the month following the month of disposition. , Authority 20 AAC 25.235 .à Excess Flare Log Report Facility Name: ANNA PLATFORM MonthlYear: April 2002 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 4/10/2002 15:00 4/10/2002 23:59 345 N Gas compressor shutdown at GPTF. OPERATIONAL UNSCHEDULED MAINTENANCE GPTF compressor shut down due Replace starter transformer at A-SP-HP to bad starter transformer. With GPTF GPTF down, Anna Platform flares excess solution gas. Electrician flown to facility to conduct repairs, starter transformer repaired and facility returned to normal operation asap. 4/11/2002 0:00 4/11/2002 23:59 707 N Gas compressor shutdown at GPTF. OPERATIONAL UNSCHEDULED MAINTENANCE GPTF compressor shut down due Replace starter transformer at A-SP-HP to bad starter transformer. With GPTF GPTF down, Anna Platform flares excess solution gas. Electrician flown to facility to conduct repairs, starter transformer repaired and facility returned to normal operation asap. 4/12/2002 11 :00 4/12/200223:59 40 N Gas compressor shutdown at GPTF. OPERATIONAL UNSCHEDULED MAINTENANCE GPTF compressor shut down due Replace starter transformer at A-SP-HP to bad starter transformer. With GPTF GPTF down, Anna Platform flares excess solution gas. Electrician flown to facility to conduct repairs, starter transformer repaired and facility returned to normal operation asap. , Report Date: 5/15/2002 Page: 1 of 1 Anna Platform tIaring Subject: Anna Platform flaring Date: Thu, 11 Apr 2002 10:05:59 -0800 From: "David Johnston" <djohnston@hoeflemet.com> To: <winton _ aubert@admin.state.ak.us> CC: <boundsj@unocal.com>, <sullifw@unocal.com> FYI. The Granite Point Tank Farm and Anna Platform are currently flaring gas because the GPTF gas compressor is shut down due to a blockage of the CIGGS line by a gas hydrate plug at the Tank Farm. Flaring commenced 2:45 PM, April 1 O. Heat is being applied, and the line should be thawed and normal operations restored later today. Please call if you have questions. RCG 907-563-2217 tA/L{, rlllO YLL I--{ if 0 -~ D '( Q G FAX ~ "~_3- '1 q()/ David W Johnston 1 of 1 4/11/2002 1 :09 PM . ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Field(s) Anna Platform Unccal Oil & Gas Granite Point Disposition Volume MCF* I. Sold 0 2. Reinjected 0 3. Flared or vented less than I hour 23 4. Flared or vented greater than I hour 0 (Supplemental report required-oSee 20 AAC 25.235) 5. Pilot and Purge 217 6. Used for lease operations 33,112 7. OÚ1er 0 TOTAL items I - 7 33,352 8. NGL gas equivalent produced 0 9. Purchased gas 12 10. Transferred from: Bruce Platform 0 GPTF-LEX 23,724 II. Transferred to: GPTF-AB 2,638 Bruce Platform 0 Remarks: I hereby certify Ú1at Ú1e foregoing is true and correct to Ú1e best of my knowledge. Signature /J ¡J/ p;, 1));'¿:~ Title: Accl. Supervisor Date: 6/1112002 (f f/ Form 10-422 Rev. 4/95 MonÚ1/Year of Disposition May-02 *Indicate contribution of each pool to total. Pool Name Code Percent Lease 18742 280150 100.00% I Official Use Only:'" Flaring AUÚ1orization > Ihr I. Safety MCF 2. Lease Use MCF , 3. Conserv. Purposes MCF Conunissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of . 60 degrees F. Report due by Ú1e 20th of Ú1e monÚ1 following Ú1e monÚ1 of disposition. AUÚ10rity 20 AAC 25.235 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Anna PlatfoITn Unoeal Oil & Gas Granite Point Disposition Vohnne MCF* 1. Sold 0 2. Reinjected 0 3. Flared or vented less than I hour 91 4. Flared or vented greater than I hour 0 (Supplemental report required-oSee 20 AAC 25.235) 5. Pilot and Purge 210 6, Used for lease operations 32,135 7. Other 0 TOTAL items I - 7 32,436 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: Bruce Platfonn 0 GPTF-LEX 21,326 II. Transferred to: GPTF-AB 3,126 Bruce Platfonn 0 Remarks: [ hereby certify that the foregoing is true and correct to the best of my knowledge. Signature dir~ /¡ /Jé tt4.) Title: Acct. Supervisor Date: 7/8/02 Form 10-422 Rev. 4195 MonthN ear of Disposition Jooe-02 "Indicate contribution of each pool to total. Pool Name Code Percent ..-~ Lease 18742 280150 100.00% ... Official Use Only - Flaring Authorization> I hr 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Field(s) Anna Platform Unocal Oil & Gas Granite Point Disposition Volume MCF' 1. Sold 0 2. Reinjected 0 3. Flared or vented less than I hour 0 4. Flared or vented greater than I hour 0 (Supplemental report required-See 20 AAC 25.235) 5. Pilot and Purge 217 6. Used for lease operations 33,272 7. Other 0 TOTAL items I -7 33,489 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: Bruce Platform 0 GPTF-LEX 23,218 II. Transferred to: GPTF-AB 3,073 Bruce Platform 0 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature t2£/¡'9 ì:Jd;A Title: Acct. Supervisor Date: 8n 12002 Form 10-422 Rev. 4/95 MonthlYear of Disposition July-02 'Indicate contribution of each pool to total. Pool Name Code Percent Lease 18742 280150 100.00% Official Use Only - Flaring Authorization> I hr 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Conunissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ", ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Unccal Oil & Gas Granite Point Anna Platform Disposition Volwne MCF* \. Sold 0 2. Reinjected 0 3. Flared or vented less than I hour 0 4. Flared or vented greater than I hour 7,608 V (Supplemental report required-See 20 AAC 25.235) 5. Pilot and Purge 217 6. Used for lease operations 31,095 7. Other 0 TOTAL items 1-7 38,920 8. NGL gas equivalent produced 0 9. Purchased gas 173 10. Transferred from: Bruce Platform 0 GPTF-LEX 17,461 I \. Transferred to: GPTF-AB 2,519 Bruce Platform 0 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature ~9. ~¿:/~ Title: Ace!. Supervisor Date: 91912002 V Form 10-422 Rev. 4195 MonthlY ear of Disposition August-02 *Indicate contribution of each pool to total. Pool Name Code Percent Lease 18742 280150 100.00% Use Only __ Flaring Authorization> I hr I. Safety 7, 6ù'ß MCF .JP:i-L- 2. Lease Use MCF 3. Conserv. Purposes MCF III -/ ?. s, O}.- Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ~ Excess Flare Log Report Facility Name: ANNA PLATFORM MonthlYear: August 2002 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 8/2102 6:00 8/2102 18:00 210 N Vapor recovery unit pump OPERATIONAL UNSCHEDULED MAINTENANCE Pump on FWKO VRU begins Replace pump replacement. making noise, possible bad bearing. Replace pump before problem worsens. Ensure proper personnel and equipment are on site before undertaking replacement. Return to normal ~~ð~ti~n o~~ibl" 8/13/02 19:00 8/13/0223:00 167 N Gas compressor shutdown. OPERATIONAL NORMAL OPERATIONS The gas compressor supplying Tank cleaning is a routine A-PM-0540 waste heat to the glycol reboiler, maintenance activity that was shutdown in order allow the contributes to more efficient glycol reboiler to be taken offline operations. for tank cleaning. Cleaning the tanks on the glycol regenerator was scheduled to coincide with pipeline repairs. 8/14/0211:00 8/14/02 23:59 466 Y Gas line from Bruce Platfonm to shore OPERATIONAL SCHEDULED MAINTENANCE Repair dented section of gas Repair pipeline shutdown for repairs. pipeline from Bruce/Anna to shore, flare formation gas pending repairs. Ensure all personnel and equipment on site prior to initiating shutdown, repair pipeline and return to normal operations. 8/15/020:01 8/15/02 23:59 664 y Gas line from Bruce Platfonm to shore OPERATIONAL SCHEDULED MAINTENANCE Repair dented section of gas Repair pipeline. shutdown for repairs. pipeline from BrucelAnna to shore, flare formation gas pending repairs. Ensure all personnel and equipment on site prior to initiating shutdown, repair pipeline and return to normal operations. 8/161020:01 8/1610223:59 905 y Gas line from Bruce Platform to shore OPERATIONAL UNSCHEDULED MAINTENANCE Repair dented section of gas Repair pipeline. shutdown for repairs. pipeline from Bruce/Anna to shore, flare formation gas pending repairs. Ensure all personnel and equipment on site prior to initiating shutdown, repair pipeline and return to normal operations. Report Date: 9/17/02 Page: 1 of 3 · Excess Flare Log Report 8/17/020:01 8/17/0223:59 907 Y Gas line from Bruce Platform to shore OPERATIONAL SCHEDULED MAINTENANCE Repair dented section of gas Repair pipeline. shutdown for repairs. pipeline from Bruce/Anna to shore, flare formation gas pending repairs. Ensure all personnel and equipment on site pñor to initiating shutdown, repair pipeline and return to normal operations. 8/18/020:01 8/18/02 23:59 902 Y Gas line from Bruce Platform to shore OPERATIONAL SCHEDULED MAINTENANCE Repair dented section of gas Repair pipeline. shutdown for repairs. pipeline from Bruce/Anna to shore, flare formation gas pending repairs. Ensure all personnel and equipment on site pñor to initiating shutdown. repair pipeline and return to normal operations. 8/19/02 0:00 8/19/0223:59 941 Y Gas line from Bruce Platform to shore OPERATIONAL SCHEDULED MAINTENANCE Repair dented section of gas Repair pipeline. shutdown for repairs. pipeline from Bruce/Anna to shore, flare formation gas pending repairs. Ensure all personnel and equipment on site pñor to initiating shutdown, repair pipeline and return to normal operations. 8/20/02 0:00 8/20/02 23:59 884 Y Gas line from Bruce Platform to shore OPERATIONAL SCHEDULED MAINTENANCE Repair dented section of gas Repair pipeline. shutdown for repairs. pipeline from Bruce/Anna to shore, flare formation gas pending repairs. Ensure all personnel and equipment on site pñor to initiating shutdown, repair pipeline and return to normal operations. 8/21/020:00 8/21/02 23:59 884 Y Gas line from Bruce Platform to shore OPERATIONAL SCHEDULED MAINTENANCE Repair dented section of gas Repair pipeline. shutdown for repairs. pipeline from Bruce/Anna to shore, flare formation gas pending repairs. Ensure all personnel and equipment on site pñor to initiating shutdown, repair pipeline and return to normal operations. 8/22/02 0:00 8/22/0218:00 458 Y Gas line from Bruce Platform to shore OPERATIONAL SCHEDULED MAINTENANCE Repair dented section of gas Repair pipeline. shutdown for repairs. pipeline from Bruce/Anna to shore, flare formation gas pending repairs. Ensure all personnel and equipment on site pñor to initiating shutdown, repair pipeline and return to normal operations. Report Date: 9/17/02 Page: 2 of 3 c'" ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Granite Point Field(s) Anna Platform Unocal Oil & Gas Disposition Volume MCF' I. Sold 0 2. Reinjected 0 3. Flared or vented less than I hour 0 4. Flared or vented greater than I hour 0 (Supplemental report required--See 20 AAC 25.235) 5. Pilot and Purge 210 6. Used for lease operations 30,879 7. Other 0 TOT ALitems I - 7 31,089 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: Bruce Platform 0 GPTF-LEX 17,719 II. Transferred to: GPTF-AB 3,184 Bruce Platform 0 Remarks: I hereby ceæ fOregOing~ true and correct to the best of my knowledge. Signature ~ ~ n - ,,1.11 JAI Title: Ace!. Supervisor Date: 10/8/2002 p /J Form 1Q..422 Rev. 4195 Month/Year of Disposition September-02 'Indicate contribution of each pool to total. Pool Name Code Percent Lease 18742 280150 100.00% Official Use. Only - Flaring Authorization> I hr I. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ......... If' Form 10-422 Rev. 4/95 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Field(s) Unocal Oil & Gas Anna Platform Granite Point Disposition Volume MCF* . 1. Sold 0 2. Reinjected 0 3. Flared or vented less than I hour 0 4. Flared or vented greater than I hour 618 ¡/ (Supplemental repon required-See 20 AAC 25.235) 5. Pilot and Purge 217 6. Used for lease operations 31,722 7. Other 0 TOTAL items I - 7 32,557 8. NGL gas equivalent produced 0 9. Purchased gas 703 10. Transferred from: Bruce Platform 0 GPTF-LEX 13,049 II. Transferred to: GPTF-AB 3,768 Bruce Platform 0 Remarks: I hereby cenify that th: foregoing ~:¿d correct to the best of my knowledge. Signature ât!CÃ1.1 /:? "kh Title: Acct. Supervisor Date: II n 12002 1/ ð v MonthlYear of Disposition October-02 *Indicate contribution of each pool to total. Pool Name Code Percent Lease 18742 280150 100.00% Official Authorization > 1 hr 1. Safety 61~ MCF 3ß4- 2. Lease Use MCF 3. Conserv. Purposes MCF 'ð'(f2>Jc;>-. Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Repon due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ~" ~ ~ Excess Flare Log Report Facility Name: ANNA PLATFORM MonthlYear: October 2002 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 10/25/20023:00 10/25/200218:00 395 Y SCHEDULED MAINTENANCE AND OPERATIONAL SCHEDULED MAINTENANCE MECHANIC REMOVED MECHANIC REPAIRED A-PM..o540 TO HOOK UP REBOILER EXHAUST EXHAUST DIVERTOR VALVE DIVERTOR VALVE OUT OF GAS COMPRESSOR SUPPLYING HEAT TO THE EXHAUST THAT HEATS REBOILER REBOILER AND REPAIRED VALVE. DURING THIS TIME WE WERE UNABLE TO COMPRESS OUR OWN GAS FOR HIGH PRESSURE FUEL GAS. WOUND UP FLARING OUR PRODUCED GAS AND BUYING HIGH PRESSURE 10/30/2002 14:00 10/30/200220:00 223 Y SHUTIN GAS PIPELINE DURING OIL OPERATIONAL OTHER: SEE DESc OF EVENT RETURN TO NORMAL OIL PIPELINE RISER A-SP-HP PIPELINE RISER INSPECTION OPERATION AFTER PIPELINE INPEcTION COMPLETED RISER INSPECTION COMPLETE AND RISK OF GAS CROSSING OVER INTO OIL PIPELINE THROUGH A POTENTIAL LEAKYVALVE IS OVER. WE WERE UNDER A DOUBLE BLOCK ISOLATION REQUIREMENT WHILE THE OIL LINE WAS OPENED UP FOR INSPECTION. \. Report Date: 11/7/2002 Page: 1 of 1 ~ "\ . , ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Unccal Oil & Gas Anna Platform Granite Point Disposition Volume MCP" 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 180 4. Plared or vented greater than 1 hour 0 (Supplemental report required-See 20 AAC 25.235) 5. Pilot and Purge 210 6. Used for lease operations 30,680 7. Other 0 TOTAL items I - 7 31,070 8. NGL gas equivalent produced 0 9. Purchased gas 58 10. Transferred from: Bruce Platform 0 GPTP-LEX 12,112 11. Transferred to: GPTP·AB 4,714 Bruce Platform 0 Remarks: 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Signature () j~CJ.. ~ ~ Title: Accl. Supervisor Date: 1211012002 Form 10-422 Rev. 4195 Month/Year of Disposition November-02 "Indicate contribution of each pool to total. Pool Name Code Percent Lease 18742 280150 100.00% Official Use Only - Flaring Authorization> 1 hr 1. Safety MCF 2. Lease Use MCP 3. Conserv. Purposes MCP Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Anna Platform Unocal Oil & Gas Granite Point Disposition Volume MCF" I. Sold 0 2. Reinjected 0 3. Flared or vented less than I hour 28 4. Flared or vented greater than I hour 89 V (Supplemental report reQuired-oSee 20 AAC 25.235) 5. Pilot and Purge 217 6. Used for lease operations 32,912 7. Other 0 TOTAL items I - 7 33,246 8. NGL gas equivalent produced 0 9. Purchased gas 19 10. Transferred from: Bruce Platform 0 GPTF-LEX 8,172 II. Transfcrred to: GPTF-AB 5.461 Bruce Platform 0 Rcmarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature - ?... :2- Title: Acct. Supervisor Date: 1/21/2003 Form 10-422 Rev. 4195 MonthlY ear of Disposition December-02 REVISION "Indicate contribution of each pool to total. Pool Name Code Perccnt Lease 18742 280150 100.00% ...................................................................... ..... ................. ............. mm~if·m~~i~m~~~~**I~mlll~ I. Safety Sf MCF V' 2. Lease Use MCF 3. Conserv. Purposes MCF d/ò/o3 Date Note: All volumes must be correctcd to ·pressure of 14.65 psia and to a temperature of 60 de~ F. Report due by the 20th ofthe month following the month of disposition. Authority 20 AAC 25.235 Excess Flare Log Report Facility Name: ANNA PLATFORM MonthlYear: December 2002 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 12/18/2002 9:00 12/18/2002 11:00 89 y ShutdOY¡l\ during bi-annuaJ alarm OPERATIONAL ALARM TESTS Power oil system was shutdown Bi-annual alarm checks. A-SP-HP checks. while peñormlng bi-annual alarm check on production alarms. . " Completed alarm checks as soo~ : as possible and returned facility to normal operatlons. " v . Report Date: 1/21/2003 Page: 1 of 1