Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutGP Anna Platform / Unocal
STATE OF ALASKA
AOGCC
GAS DISPOSITION FILES
YEAR: 2002
FACILITY: GP Anna Platform
OPERATOR: UNION OIL CO OF
CALIFORNIA
.....
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) MonthlY ear of Disposition
ANNA PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD JANUARY 2002
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 892 /
(Supplemental report reqaired - See 20 AAC 25.235)
5. Pilot and Purge 217
6. Used for lease operations 33.497
7. Other 0
TOTAL items 1 - 7 34.606 /
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 26,662
Remarks:
I hereby certify that the t<golng Is true and correct to the best or my knowledge.
Signature ØøQ, ,;j.k Title ACCOUNTING SUPERVISOR Date 02/07/2002
7r I
Form 10-422
Rev. 4/95
*Indicate contribution of eac,h pool to total.
Pool Name Code Percent.
MIDDLE KENAI 280150 100.00
!!·~IIIII!il~lill~I!~ill~II·I~~IIi=II~I!III~1111111111111111111/111/1/1
1. Safety MCF
2. Lease Use
gý;).-
MCF
3. Conserv. Purposes
MCF
3/ __I
. ~ 0 r-
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
IL
Excess Flare Log Report
Facility Name:
ANNA PLATFORM
MonthlY ear:
January 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimi~e Recurrence MP-2 ID Number
1/30/200216:00 1/30/200223:69 400 N Pipeline shut-in to bleed off OPERATIONAL OTHER: SEE DESC OF EVENT 'A' line undergoing pigging Normal oil field operation.
pressure for stuck pig. operation to remove liquids. Pig
stuck at base of Bruce in 12-inch
diameter section of pipe. Free pig
by bleeding down P/L to remove
pressure, return pig to Anna for
removal from line. Return facility to
normal operations.
1/31/20020:00 1/31/200212:00 492 N Pipeline shut-in to bleed off OPERATIONAL OTHER: SEE DESC OF EVENT 'A' line undergoing pigging Normal oil field operation.
pressure for stuck pig. operation to remove liquids. Pig
stuck at base of Bruce in 12-inch
diameter section of pipe. Free pig
by bleeding down PIL to remove
pressure, return pig to Anna for
removal from line. Return facility to
normal operations.
.
Report Date: 2/11/2002
Page: 1 of 1
flare on Anna and Bruce
Subject: flare on Anna and Bruce
Date: Thu, 31 Jan 2002 17:22:31 -0800
From: "Bounds, Janet G" <boundsj@unocal.com>
To: "McMains, Stephen·E -Vendor" <Steve_McMains@admin.state.ak.us>
CC: "Dorman, Allen" <dormana@unocal.com>, "Myers, Chris S" <myersc@unocal.com>
Steve
On Monday, January 28, 2002 we began pigging the gas line from Anna to Bruce
~o remove ~ondensate. The pig became stuck in the line. Efforts to free
the pig did not work until the line was shut in, and we waited for the
temperature in the line to raise. The pig was freed around 2:00 pm today.
The pigging activity resulted in increased flare volumes at both Anna and
Bruce platforms.
Janet G. Bounds
Senior Environmental Scientist
Unocal
Phone (907) 263-7694
Fax (907) 263-7901
1 of 1 2/1/026:17 AM
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) MonthlY ear of Disposition
ANNA PLATFORM ) UNOCAL ALASKA RESOURCES GRANITE POINT FIELD FEBRUARY 2002
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 585/
(Snpplemental report reqnired - See 20 AAC 25.235)
5. Pilót and Purge 196
6. Used for lease operations 29.320
7. Other 0
TOTAL items 1 - 7 30.101/
8. NGL gas equivalent produced 0
9. Purchased gas 643
10. Transferred from: 0
11. Transferred to: 26.912
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature dlej(f( 02e !1t,j¿' Title ACCOUNTING SUPERVISOR Date 03/08/2002
'I fI
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 100.00
.................................................................................................................
..................................................................................................................................................................................................................................
:i!!·III~II.I~¡IIII::~.I~IIIIII~III!~··I·i~I·:I·-¡!III·'1:'1:11:'.11'"
1. Safety
MCF
2. Lease Use
5fS MCF
ìUrÅ-
312.'1./0 L
3. Conserv. Purposes
MCF
3/ ,þJ'{t>.;r
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Excess Flare Log Report
Facility Name:
ANNA PLATFORM
MonthlYear:
February 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End ) MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
2/1/20020:00 2/1/2002 16:00 585 Y Gas compressor shutdown for OPERATIONAL SCHEDULED MAINTENANCE Insure appropriate personnel and Routine maintenance to safe
scheduled maintenance. equipment are on site prior to and reliable operation.
shutdown, perform inspection and
maintenance on compressor, and
return facility to normal operation
as soon as possible.
.
Report Date: 3/8/2002
Page: 1 of 1
~
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) MonthlY ear of Disposition
ANNA PLATFORM , UNOCAL ALASKA RESOURCES GRANITE POINT FIELD MARCH 2002
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 35 ./
4. Flared or vented greater than 1 hour 530 ,/
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 217
6. Used for lease operations .. 32,063
7. Other 0
TOTAL items 1-7 32.845
8. NGL gas equivalent produced 0
9. Purchased gas 376
10. Transferred from: 0
.,
11. Transferred to: 27.351
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature /lit /r?:a~ ÌY;/j(jIÞ~ Title ACCOUNTING SUPERVISOR Date 04/12/2002
J 1/
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 100.00
,
1111111111~¡111111~111.1111111~11111~1111!llllllllil1IIIIIilll
1. Safety MCF
2. Lease Use
63D MCF VJ6,f-
3. Conserv. Purposes
MCF
4/>1(OY
Note: All volumes must be cor ec e to
pressure of 14.65 psia and to a temPRwwr$( o~¡ Z DOL
60 degrees F. Report due by the 20tlt\rtitbJ
month following the month of disposition. ¡-.'" " n
Authority 20 AAC 25.235 A1aSka(J&Gas\lUlIi.
~
Excess Flare Log Report
Facility Name:
ANNA PLATFORM
MonthlYear:
March 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End . MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
3/12/200219:15 3/12/2002 23:59 197 N GAS COMPRESSOR DOWN FOR OPERATIONAL UNSCHEDULED MAINTENANCE Compressor shut down due to bad Replace controller card.
MAINTENANCE controller card. Instrument
technician flown to platform.
compressor repaired and facility
returned to normal operation as
soon as possible. AOGcc was
given prior e-mail notice on flaring
on M"rr.h 14 2002.
3/13/20020:00 3/13/20028:00 333 N GAS COMPRESSOR DOWN FOR OPERATIONAL UNSCHEDULED MAINTENANCE Compressor shut down due to bad Replace controller card.
MAINT. controller card. Instrument
technician flown to platform,
compressor repaired and facility
returned to normal operation as
soon as possible. AOOcc was
given prior e-,"-ail nptice on flaring
on March 14, 2002.
..
"
'.
Report Date: 4/11/2002
Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) MonthlY ear of Disposition
ANNA PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD APRIL 2002
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 25 ¡./
4. Flared or vented greater than 1 hour 1. 092 ./
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 210 ,,/
6. Used for lease operations 32.183 ;/
7. Other 0
TOTAL items 1 - 7 33.510 ./
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 25.165
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signatured&.ld ;l~~ Title ACCOUNTING SUPERVISOR Date 05/07/2002
// //
v.
Form 1 0-422
Rev. 4195
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 100.00
!:I:lli111·I;il¡II~IÎ~·I!.IIIIIIII·II!I~~ilillllll·:I·~.¡.j~1·lll
1. Safety {öc¡-z.- MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
~A.~r1. , ~ ~
Commi loner Date
.5ߡe-
Note: All volumes must be corrected~t? r.' /' ('"
pressure of 14.65 psia and to a temp"'a~ ot
60 degrees F. Report due by the 20th of the
month following the month of disposition. ,
Authority 20 AAC 25.235
.à
Excess Flare Log Report
Facility Name:
ANNA PLATFORM
MonthlYear:
April 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
4/10/2002 15:00 4/10/2002 23:59 345 N Gas compressor shutdown at GPTF. OPERATIONAL UNSCHEDULED MAINTENANCE GPTF compressor shut down due Replace starter transformer at A-SP-HP
to bad starter transformer. With GPTF
GPTF down, Anna Platform flares
excess solution gas. Electrician
flown to facility to conduct repairs,
starter transformer repaired and
facility returned to normal operation
asap.
4/11/2002 0:00 4/11/2002 23:59 707 N Gas compressor shutdown at GPTF. OPERATIONAL UNSCHEDULED MAINTENANCE GPTF compressor shut down due Replace starter transformer at A-SP-HP
to bad starter transformer. With GPTF
GPTF down, Anna Platform flares
excess solution gas. Electrician
flown to facility to conduct repairs,
starter transformer repaired and
facility returned to normal operation
asap.
4/12/2002 11 :00 4/12/200223:59 40 N Gas compressor shutdown at GPTF. OPERATIONAL UNSCHEDULED MAINTENANCE GPTF compressor shut down due Replace starter transformer at A-SP-HP
to bad starter transformer. With GPTF
GPTF down, Anna Platform flares
excess solution gas. Electrician
flown to facility to conduct repairs,
starter transformer repaired and
facility returned to normal operation
asap.
,
Report Date: 5/15/2002
Page: 1 of 1
Anna Platform tIaring
Subject: Anna Platform flaring
Date: Thu, 11 Apr 2002 10:05:59 -0800
From: "David Johnston" <djohnston@hoeflemet.com>
To: <winton _ aubert@admin.state.ak.us>
CC: <boundsj@unocal.com>, <sullifw@unocal.com>
FYI. The Granite Point Tank Farm and Anna Platform are currently flaring gas because the GPTF gas
compressor is shut down due to a blockage of the CIGGS line by a gas hydrate plug at the Tank Farm. Flaring
commenced 2:45 PM, April 1 O. Heat is being applied, and the line should be thawed and normal operations
restored later today. Please call if you have questions.
RCG
907-563-2217
tA/L{, rlllO YLL I--{ if 0 -~ D '( Q G
FAX ~ "~_3- '1 q()/
David W Johnston
1 of 1
4/11/2002 1 :09 PM
.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Field(s)
Anna Platform
Unccal Oil & Gas
Granite Point
Disposition Volume MCF*
I. Sold 0
2. Reinjected 0
3. Flared or vented less than I hour 23
4. Flared or vented greater than I hour 0
(Supplemental report required-oSee 20 AAC 25.235)
5. Pilot and Purge 217
6. Used for lease operations 33,112
7. OÚ1er 0
TOTAL items I - 7 33,352
8. NGL gas equivalent produced 0
9. Purchased gas 12
10. Transferred from: Bruce Platform 0
GPTF-LEX 23,724
II. Transferred to: GPTF-AB 2,638
Bruce Platform 0
Remarks:
I hereby certify Ú1at Ú1e foregoing is true and correct to Ú1e best of my knowledge.
Signature /J ¡J/ p;, 1));'¿:~ Title: Accl. Supervisor Date: 6/1112002
(f f/
Form 10-422
Rev. 4/95
MonÚ1/Year of Disposition
May-02
*Indicate contribution of each pool to total.
Pool Name Code Percent
Lease 18742 280150 100.00%
I
Official Use Only:'" Flaring AUÚ1orization > Ihr
I. Safety MCF
2. Lease Use MCF
,
3. Conserv. Purposes MCF
Conunissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
. 60 degrees F. Report due by Ú1e 20th of Ú1e
monÚ1 following Ú1e monÚ1 of disposition.
AUÚ10rity 20 AAC 25.235
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Anna PlatfoITn
Unoeal Oil & Gas
Granite Point
Disposition Vohnne MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than I hour 91
4. Flared or vented greater than I hour 0
(Supplemental report required-oSee 20 AAC 25.235)
5. Pilot and Purge 210
6, Used for lease operations 32,135
7. Other 0
TOTAL items I - 7 32,436
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: Bruce Platfonn 0
GPTF-LEX 21,326
II. Transferred to: GPTF-AB 3,126
Bruce Platfonn 0
Remarks:
[ hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature dir~ /¡ /Jé tt4.) Title: Acct. Supervisor Date: 7/8/02
Form 10-422
Rev. 4195
MonthN ear of Disposition
Jooe-02
"Indicate contribution of each pool to total.
Pool Name Code Percent
..-~
Lease 18742 280150 100.00%
...
Official Use Only - Flaring Authorization> I hr
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Field(s)
Anna Platform
Unocal Oil & Gas
Granite Point
Disposition Volume MCF'
1. Sold 0
2. Reinjected 0
3. Flared or vented less than I hour 0
4. Flared or vented greater than I hour 0
(Supplemental report required-See 20 AAC 25.235)
5. Pilot and Purge 217
6. Used for lease operations 33,272
7. Other 0
TOTAL items I -7 33,489
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: Bruce Platform 0
GPTF-LEX 23,218
II. Transferred to: GPTF-AB 3,073
Bruce Platform 0
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature t2£/¡'9 ì:Jd;A Title: Acct. Supervisor Date: 8n 12002
Form 10-422
Rev. 4/95
MonthlYear of Disposition
July-02
'Indicate contribution of each pool to total.
Pool Name Code Percent
Lease 18742 280150 100.00%
Official Use Only - Flaring Authorization> I hr
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Conunissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
",
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Unccal Oil & Gas
Granite Point
Anna Platform
Disposition Volwne MCF*
\. Sold 0
2. Reinjected 0
3. Flared or vented less than I hour 0
4. Flared or vented greater than I hour 7,608 V
(Supplemental report required-See 20 AAC 25.235)
5. Pilot and Purge 217
6. Used for lease operations 31,095
7. Other 0
TOTAL items 1-7 38,920
8. NGL gas equivalent produced 0
9. Purchased gas 173
10. Transferred from: Bruce Platform 0
GPTF-LEX 17,461
I \. Transferred to: GPTF-AB 2,519
Bruce Platform 0
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ~9. ~¿:/~ Title: Ace!. Supervisor Date: 91912002
V
Form 10-422
Rev. 4195
MonthlY ear of Disposition
August-02
*Indicate contribution of each pool to total.
Pool Name Code Percent
Lease 18742 280150 100.00%
Use Only __ Flaring Authorization> I hr
I. Safety
7, 6ù'ß MCF .JP:i-L-
2. Lease Use
MCF
3. Conserv. Purposes
MCF
III -/
?. s, O}.-
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
~
Excess Flare Log Report
Facility Name:
ANNA PLATFORM
MonthlYear:
August 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
8/2102 6:00 8/2102 18:00 210 N Vapor recovery unit pump OPERATIONAL UNSCHEDULED MAINTENANCE Pump on FWKO VRU begins Replace pump
replacement. making noise, possible bad
bearing. Replace pump before
problem worsens. Ensure proper
personnel and equipment are on
site before undertaking
replacement. Return to normal
~~ð~ti~n o~~ibl"
8/13/02 19:00 8/13/0223:00 167 N Gas compressor shutdown. OPERATIONAL NORMAL OPERATIONS The gas compressor supplying Tank cleaning is a routine A-PM-0540
waste heat to the glycol reboiler, maintenance activity that
was shutdown in order allow the contributes to more efficient
glycol reboiler to be taken offline operations.
for tank cleaning. Cleaning the
tanks on the glycol regenerator
was scheduled to coincide with
pipeline repairs.
8/14/0211:00 8/14/02 23:59 466 Y Gas line from Bruce Platfonm to shore OPERATIONAL SCHEDULED MAINTENANCE Repair dented section of gas Repair pipeline
shutdown for repairs. pipeline from Bruce/Anna to shore,
flare formation gas pending
repairs. Ensure all personnel and
equipment on site prior to initiating
shutdown, repair pipeline and
return to normal operations.
8/15/020:01 8/15/02 23:59 664 y Gas line from Bruce Platfonm to shore OPERATIONAL SCHEDULED MAINTENANCE Repair dented section of gas Repair pipeline.
shutdown for repairs. pipeline from BrucelAnna to shore,
flare formation gas pending
repairs. Ensure all personnel and
equipment on site prior to initiating
shutdown, repair pipeline and
return to normal operations.
8/161020:01 8/1610223:59 905 y Gas line from Bruce Platform to shore OPERATIONAL UNSCHEDULED MAINTENANCE Repair dented section of gas Repair pipeline.
shutdown for repairs. pipeline from Bruce/Anna to shore,
flare formation gas pending
repairs. Ensure all personnel and
equipment on site prior to initiating
shutdown, repair pipeline and
return to normal operations.
Report Date: 9/17/02
Page: 1 of 3
·
Excess Flare Log Report
8/17/020:01 8/17/0223:59 907 Y Gas line from Bruce Platform to shore OPERATIONAL SCHEDULED MAINTENANCE Repair dented section of gas Repair pipeline.
shutdown for repairs. pipeline from Bruce/Anna to shore,
flare formation gas pending
repairs. Ensure all personnel and
equipment on site pñor to initiating
shutdown, repair pipeline and
return to normal operations.
8/18/020:01 8/18/02 23:59 902 Y Gas line from Bruce Platform to shore OPERATIONAL SCHEDULED MAINTENANCE Repair dented section of gas Repair pipeline.
shutdown for repairs. pipeline from Bruce/Anna to shore,
flare formation gas pending
repairs. Ensure all personnel and
equipment on site pñor to initiating
shutdown. repair pipeline and
return to normal operations.
8/19/02 0:00 8/19/0223:59 941 Y Gas line from Bruce Platform to shore OPERATIONAL SCHEDULED MAINTENANCE Repair dented section of gas Repair pipeline.
shutdown for repairs. pipeline from Bruce/Anna to shore,
flare formation gas pending
repairs. Ensure all personnel and
equipment on site pñor to initiating
shutdown, repair pipeline and
return to normal operations.
8/20/02 0:00 8/20/02 23:59 884 Y Gas line from Bruce Platform to shore OPERATIONAL SCHEDULED MAINTENANCE Repair dented section of gas Repair pipeline.
shutdown for repairs. pipeline from Bruce/Anna to shore,
flare formation gas pending
repairs. Ensure all personnel and
equipment on site pñor to initiating
shutdown, repair pipeline and
return to normal operations.
8/21/020:00 8/21/02 23:59 884 Y Gas line from Bruce Platform to shore OPERATIONAL SCHEDULED MAINTENANCE Repair dented section of gas Repair pipeline.
shutdown for repairs. pipeline from Bruce/Anna to shore,
flare formation gas pending
repairs. Ensure all personnel and
equipment on site pñor to initiating
shutdown, repair pipeline and
return to normal operations.
8/22/02 0:00 8/22/0218:00 458 Y Gas line from Bruce Platform to shore OPERATIONAL SCHEDULED MAINTENANCE Repair dented section of gas Repair pipeline.
shutdown for repairs. pipeline from Bruce/Anna to shore,
flare formation gas pending
repairs. Ensure all personnel and
equipment on site pñor to initiating
shutdown, repair pipeline and
return to normal operations.
Report Date: 9/17/02
Page: 2 of 3
c'"
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Granite Point
Field(s)
Anna Platform
Unocal Oil & Gas
Disposition Volume MCF'
I. Sold 0
2. Reinjected 0
3. Flared or vented less than I hour 0
4. Flared or vented greater than I hour 0
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge 210
6. Used for lease operations 30,879
7. Other 0
TOT ALitems I - 7 31,089
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: Bruce Platform 0
GPTF-LEX 17,719
II. Transferred to: GPTF-AB 3,184
Bruce Platform 0
Remarks:
I hereby ceæ fOregOing~ true and correct to the best of my knowledge.
Signature ~ ~ n - ,,1.11 JAI Title: Ace!. Supervisor Date: 10/8/2002
p /J
Form 1Q..422
Rev. 4195
Month/Year of Disposition
September-02
'Indicate contribution of each pool to total.
Pool Name Code Percent
Lease 18742 280150 100.00%
Official Use. Only - Flaring Authorization> I hr
I. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
.........
If'
Form 10-422
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Field(s)
Unocal Oil & Gas
Anna Platform
Granite Point
Disposition Volume MCF*
.
1. Sold 0
2. Reinjected 0
3. Flared or vented less than I hour 0
4. Flared or vented greater than I hour 618 ¡/
(Supplemental repon required-See 20 AAC 25.235)
5. Pilot and Purge 217
6. Used for lease operations 31,722
7. Other 0
TOTAL items I - 7 32,557
8. NGL gas equivalent produced 0
9. Purchased gas 703
10. Transferred from: Bruce Platform 0
GPTF-LEX 13,049
II. Transferred to: GPTF-AB 3,768
Bruce Platform 0
Remarks:
I hereby cenify that th: foregoing ~:¿d correct to the best of my knowledge.
Signature ât!CÃ1.1 /:? "kh Title: Acct. Supervisor Date: II n 12002
1/ ð
v
MonthlYear of Disposition
October-02
*Indicate contribution of each pool to total.
Pool Name Code Percent
Lease 18742 280150 100.00%
Official
Authorization > 1 hr
1. Safety
61~ MCF 3ß4-
2. Lease Use
MCF
3. Conserv. Purposes
MCF
'ð'(f2>Jc;>-.
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Repon due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
~"
~
~
Excess Flare Log Report
Facility Name:
ANNA PLATFORM
MonthlYear:
October 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
10/25/20023:00 10/25/200218:00 395 Y SCHEDULED MAINTENANCE AND OPERATIONAL SCHEDULED MAINTENANCE MECHANIC REMOVED MECHANIC REPAIRED A-PM..o540
TO HOOK UP REBOILER EXHAUST EXHAUST DIVERTOR VALVE DIVERTOR VALVE
OUT OF GAS COMPRESSOR SUPPLYING HEAT TO THE
EXHAUST THAT HEATS REBOILER
REBOILER AND REPAIRED
VALVE. DURING THIS TIME WE
WERE UNABLE TO COMPRESS
OUR OWN GAS FOR HIGH
PRESSURE FUEL GAS. WOUND
UP FLARING OUR PRODUCED
GAS AND BUYING HIGH
PRESSURE
10/30/2002 14:00 10/30/200220:00 223 Y SHUTIN GAS PIPELINE DURING OIL OPERATIONAL OTHER: SEE DESc OF EVENT RETURN TO NORMAL OIL PIPELINE RISER A-SP-HP
PIPELINE RISER INSPECTION OPERATION AFTER PIPELINE INPEcTION COMPLETED
RISER INSPECTION COMPLETE AND RISK OF GAS
CROSSING OVER INTO OIL
PIPELINE THROUGH A
POTENTIAL LEAKYVALVE IS
OVER. WE WERE UNDER A
DOUBLE BLOCK ISOLATION
REQUIREMENT WHILE THE
OIL LINE WAS OPENED UP
FOR INSPECTION.
\.
Report Date: 11/7/2002
Page: 1 of 1
~ "\
. ,
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Unccal Oil & Gas
Anna Platform
Granite Point
Disposition Volume MCP"
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 180
4. Plared or vented greater than 1 hour 0
(Supplemental report required-See 20 AAC 25.235)
5. Pilot and Purge 210
6. Used for lease operations 30,680
7. Other 0
TOTAL items I - 7 31,070
8. NGL gas equivalent produced 0
9. Purchased gas 58
10. Transferred from: Bruce Platform 0
GPTP-LEX 12,112
11. Transferred to: GPTP·AB 4,714
Bruce Platform 0
Remarks:
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature () j~CJ.. ~ ~ Title: Accl. Supervisor Date: 1211012002
Form 10-422
Rev. 4195
Month/Year of Disposition
November-02
"Indicate contribution of each pool to total.
Pool Name Code Percent
Lease 18742 280150 100.00%
Official Use Only - Flaring Authorization> 1 hr
1. Safety MCF
2. Lease Use MCP
3. Conserv. Purposes MCP
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Anna Platform
Unocal Oil & Gas
Granite Point
Disposition Volume MCF"
I. Sold 0
2. Reinjected 0
3. Flared or vented less than I hour 28
4. Flared or vented greater than I hour 89 V
(Supplemental report reQuired-oSee 20 AAC 25.235)
5. Pilot and Purge 217
6. Used for lease operations 32,912
7. Other 0
TOTAL items I - 7 33,246
8. NGL gas equivalent produced 0
9. Purchased gas 19
10. Transferred from: Bruce Platform 0
GPTF-LEX 8,172
II. Transfcrred to: GPTF-AB 5.461
Bruce Platform 0
Rcmarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature - ?... :2- Title: Acct. Supervisor Date: 1/21/2003
Form 10-422
Rev. 4195
MonthlY ear of Disposition
December-02
REVISION
"Indicate contribution of each pool to total.
Pool Name Code Perccnt
Lease 18742 280150 100.00%
......................................................................
..... ................. .............
mm~if·m~~i~m~~~~**I~mlll~
I. Safety
Sf
MCF
V'
2. Lease Use
MCF
3. Conserv. Purposes
MCF
d/ò/o3
Date
Note: All volumes must be correctcd to
·pressure of 14.65 psia and to a temperature of
60 de~ F. Report due by the 20th ofthe
month following the month of disposition.
Authority 20 AAC 25.235
Excess Flare Log Report
Facility Name:
ANNA PLATFORM
MonthlYear:
December 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
12/18/2002 9:00 12/18/2002 11:00 89 y ShutdOY¡l\ during bi-annuaJ alarm OPERATIONAL ALARM TESTS Power oil system was shutdown Bi-annual alarm checks. A-SP-HP
checks. while peñormlng bi-annual alarm
check on production alarms.
. " Completed alarm checks as soo~
: as possible and returned facility
to normal operatlons.
"
v
.
Report Date: 1/21/2003
Page: 1 of 1